﻿Volume 2 
1970 Annual Report 
of the Chief of 
on Civil Works 
Engineers 
Activities 
> 
-U-,b 
A
"d 
:partment of the Army 
)rps of Engineers 
K:I

1970 Annual Report 
.of the Chief of Engineers 
on Civil Works Activities 
Volume 11 
Department of the Army. Corps of Engineers 
For sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, D.C. 20402 - Price $9.50

CONTENTS 
Page 
NEW ENGLAND DIVISION .................................. 1 
NORTH ATLANTIC DIVISION: 
New York, N.Y., District ............... ... .............. 81 
Philadelphia, Pa., District .................................... 129 
Baltimore, Md., District ............... . .. ... .............. 153 
Norfolk, Va., District ............... ..................... 201 
SOUTH ATLANTIC DIVISION: 
Wilmington, N.C., District .................................... 225 
Charleston, S.C., District ..................... .............. 259 
Savannah, Ga., District ................................... 275 
Jacksonville, Fla., District ................................. 287 
Mobile, Ala., District .................. .................. 331 
LOWER MISSISSIPPI VALLEY DIVISION: 
New Orleans, La., District ................................. 379 
Vicksburg, Miss., District ................................. 427 
Memphis, Tenn., District ................ .... ............ 439 
St. Louis, Mo., District ................................... 447 
SOUTHWESTERN DIVISION: 
Galveston, Tex., District ................................. 463 
Fort Worth, Tex., District ................................. 505 
Albuquerque, N. Mex., District ............................. 533 
Little Rock, Ark., District ...................... .......... 551 
Tulsa, Okla., District .................. ................. 573 
MISSOURI RIVER DIVISION: 
Kansas City, Mo., District ....................... ......... 607 
Omaha, Nebr., District ................................... 639 
OHIO RIVER DIVISION: 
Ohio River ............................................ 667 
Nashville, Tenn., District ... ............ .................. 677 
Louisville, Ky., District ................................... 699 
Huntington, W.Va., District ................................ 735 
Pittsburgh, Pa., District ................................... 765 
NORTH CENTRAL DIVISION: 
St. Paul, Minn., District ............ .................... 801 
Rock Island, Ill., District .................................. 825 
Mississippi River between Missouri River and Minneapolis, Minn. ........ 843 
Chicago, Ill., District .................................... 853 
Detroit, Mich., District ................................... 897 
Buffalo, N.Y., District ................................... 943 
U.S. Lake Survey ....................................... 979 
SOUTH PACIFIC DIVISION: 
Los Angeles, Calif., District ................................ 985 
San Francisco, Calif., District .............................. 1025 
Sacramento, Calif., District ................................ 1051 
PACIFIC OCEAN DIVISION: 
Honolulu, Hawaii, District ................................... 1085 
NORTH PACIFIC DIVISION: 
Portland, Oreg., District .................................. 1095 
Seattle, Wash.,District ................................... 1147 
Walla Walla, Wash., District ................................ 1175 
Alaska District ........................................ 1199 
Board of Engineers for Rivers and Harbors ......................... 1215 
Mississippi RiverCommission .................................. 1219 
Coastal Engineering Research Center ............................. 1263 
California Debris Commission ................................ 1265 
Waterways Experiment Station ................................ 1273 
Permanent International Association of Navigation Congress ............. 1275 
Investigations and supervision of projects under Federal Water Power Act . . . . 1277 
Miscellaneous Civil Works .................................... 1279 
Index ................................................. 1297

.0. /V '" ' 
o- s s. o v 
'
! 
" 
S~o~o 
N , "_.. 11 
s IU 
/ r , . �C 10Sr \~~\ \"L., I'vi / 1o , O- -,,' -.. - 
0 " " - tMI ' IS SS Pco . re 
� ,,. Fort Wo.rt ......- ...... , S OU, L ..... 
THLAESA, _D V,v�S.I .O.N * DIVISIONDISTRIvnnoT 
1 - 1\.O\. L..- ./ ....... -- CORDIPVSIS IOONF &E NDGISINTREIECRTS 
) .. , . o, vis ,o( ,o BOUNDARIES 
i RRIVERR . 'HjRBOR 
THE ALASKA DISTRICT, Golvst IV F 8OHABOR 
HEADQUARTERS, ANCHORAGE HAOOR 
ALASKA. IS INCLUDED IN LEGENO 
THE NORTH PACIFIC DIVISION. EoGEvDon Ouo 
THE TERRITORY OF PUERTO RICO .*oesatcT sOUNoAY 
THE STATE OF HAWAII -AND ADJACENT ISLANDS IS 0 vSON noEDUAES 
AHNODN OILSULALUN DSD ISINTR ITCHTE, PPAACCIIFFIICC AORCEE AINN CDLIUVDIESIDO NI,N ISNOCULTUHD EDAT LIANN TJIACC KDSIVOINSIVOINLL. E DISTRICT, n So NDo DSIrS TRoIC .TS T OuonRRs 
WITH HEADQUARTERS AT HONOLULU. HAWAII 
0 in 00 a"H 400 "il.

NEW ENGLAND DIVISION* 
The New England Division, an operating division 
with both district and division functions, comprises all 
of New England except western Vermont and small 
portions of Massachusetts and Connecticut along their 
western boundaries, and includes small portions of 
southeastern New York, all embraced in the drainage 
basins tributary to Long Island Sound and the Atlantic 
Ocean east of the New York-Connecticut State line. It 
also includes Fishers Island, N.Y. 
IMPROVEMENTS 
Navigation 
1. Andrews River, Mass. ...... ......... 
2. Boston Harbor, Mass .............................. 
3. Cape Cod Canal, Mass. ................... 
4. Chatham (Stage) Harbor, Mass. ......... 
5. Cohasset Harbor, Mass ........................... 
6. Connecticut River Below Hartford, Conn. 
7. Fall River Harbor, Mass ........................ 
8. Gloucester Harbor and Annisquam 
River, Mass ....................... 
9. Green Harbor, Mass ............................... 
10. Hampton Harbor, N.H. ......................... 
11. Harbor of Refuge, Block Island, R.I. ..... 
12. Housatonic River, Conn ......................... 
13. Kennebunk River, Maine ...................... 
14. Lagoon Pond, Tisbury, Martha's 
Vineyard, Mass. .................................. 
15. Menemsha Creek, Martha's Vineyard, 
Ma ss. .................................................. 
16. New Haven Harbor, Conn. ................. 
17. Newburyport Harbor, Mass. .................... 
18. Niantic Bay and Harbor, Conn. ....... 
19. Norwalk Harbor, Conn .......................... 
20. Plymouth Harbor, Mass ......................... 
21. Portland Harbor, Maine ........................ 
22. Portsmouth Harbor and Piscataqua 
River, Maine and N.H. ..................... 
23. Providence River and Harbor, R.I......... 
24. Provincetown Harbor, Mass. ................... 
25. Red Brook Harbor, Bourne, Mass. ......... 
26. Rockport Harbor, Mass .......................... 
27. Royal River, Maine ......................... 
28. Saco River, Maine .......................... 
29. Scarboro River, Maine ...................... 
30. Stamford Harbor, Conn ......................... 
31. Stony Creek, Branford, Conn. .............. 
32. Wellfleet Harbor, Mass ............................. 
33. Wells Harbor, Maine ............................... 
34. Westport Harbor and Saugatuck River, 
Conn. ............................................ 
35. Weymouth-Fore and Town Rivers, 
Boston Harbor, Mass .......................... 
* All cost and financial statements for projects are listed at the 
appear at the end of this chapter. 
Page Navigation (cont.) Page 
2 36. Reconnaissance and condition surveys ... 20 
2 37. Other authorized navigation projects ..... 20 
3 38. Navigation activities pursuant to Section 
4 107, Public Law 86-645 
5 (Preauthorization) ............................. 20 
5 Alteration of Bridges 
6 39. Authorized bridge alteration ................. 21 
Beach Erosion Control 
7 40. Cliff Walk, Newport, R.I ................... 21 
8 41. Oak Bluffs Town Beach, Martha's 
8 Vineyard, Mass .................................. 21 
8 42. Inspection of completed beach erosion 
9 control projects .................................... 21 
9 43. Other authorized beach erosion control 
projects .............................................. 22 
10 44. Beach erosion control work under 
special authorization .......................... 22 
10 Flood Control 
11 45. Blackstone River Basin, Mass. and R.I. 22 
11 45A. Lower Woonsocket, R.I. ......................... 22 
12 45B. West Hill Dam, Mass. ................. 22 
12 46. Charles River Locks & Dam, Mass. ....... 23 
13 47. Connecticut River Basin, Vt., N.H., 
13 Mass. and Conn ............................... 23 
47A. Ball Mountain Lake, Vt. .......................... 24 
14 47B. Barre Falls Dam, Mass. ......................... 24 
15 47C. Beaver Brook Lake, N.H. ...................... 24 
15 47D. Birch Hill Dam, Mass. .......................... 25 
16 47E. Chicopee Falls, Mass ............................ 26 
16 47F. Colebrook River Lake, Conn. .................. 26 
16 47G. Conant Brook Dam, Mass .................... 26 
17 47H. Gardner, Mass ...................................... 27 
17 471. Gaysville\ Lake, Vt ............................... 27 
17 47J. Knightville Dam, Mass ......................... 27 
18 47K. Littleville Lake, Mass .............................. 28 
18 47L. Mad River Lake, Conn. ........................... 2P 
19 47M. North Hartland Lake, Vt. ....................... 29 
47N. North Springfield Lake, Vt. ..................... 29 
19 470. Otter Brook Lake, N.H ........................... 29 
47P. Sucker Brook Dam, Conn. ........................ 30 
20 47Q. Surry Mountain Lake, N.H. ................. 30 
end of this chapter. All other tables are referenced in text and also

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
47R. 
47S. 
47T. 
47U. 
47V. 
48. 
49. 
49A. 
49B. 
49C. 
49D. 
49E. 
49F. 
49G. 
49H. 
491. 
49J. 
50. 
50A. 
50B. 
50C. 
50D. 
50E. 
50F. 
Flood Control (cont.) Page 
Three Rivers, Mass. ................................. 31 
Townshend Lake, Vt. ............................ 31 
Tully Lake, Mass. ................................. 31 
Union Village Dam, Vt. ....................... 32 
White River, Hartford, Vt. ................... 32 
Fox Point Barrier, Narrangansett Bay, 
R.I ........................................................... 32 
Housatonic River Basin, Conn ............ 33 
Ansonia-Derby, Conn ............................ 33 
Black Rock Lake, Conn. ...................... 33 
Danbury, Conn. .................................... 34 
Derby, Conn ......................................... 34 
East Branch Dam, Conn. ...................... 34 
Hall Meadow Brook Dam, Conn. ........ 35 
Hancock Brook Conn ........................... 35 
Hop Brook Lake, Conn ........................ 36 
Northfield Brook Lake, Conn. .................. 36 
Thomaston Dam, Conn. ........................ 36 
Merrimack River Basin, N.H. and 
Mass ............................ 36 
Baker Brook, Mass. ................................... 37 
Blackwater Dam, N.H ......................... 37 
Edward MacDowell Dam, N.H .............. 38 
Franklin Falls Dam, N.H ................... 38 
Hopkinton-Everett Lakes, N.H. ............ 38 
Nookagee Lake, Mass ........................ . 39 
62. 
63. 
General Investigations 
Surveys .............................................. 
Collection and Study of Basic Data ....... 
45 
46 
NAVIGATION 
1. ANDREWS RIVER, MASS. 
Location. On Nantucket Sound within town of 
Harwich, Mass., about 84 miles southeast of Boston, 
Mass. (See Coast and Geodetic Survey Chart 257.) 
Existing project. Channel 6 feet deep, 75 feet wide, 
extending about 2,900 feet from deep water in 
Nantucket Sound to a public marina, two jetties on east 
and west sides of harbor entrance, and a 3-acre 
maneuvering and anchorage basin. Plane of reference 
is mean low water. Mean tidal range is 3.7 feet, and 
maximum range, due to combined effect of wind and 
other causes, is 6.5 feet. (See Table 1-B at end of 
chapter for Acts authorizing existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. None. 
Operations and results during fiscalyear. New work: Fund 
adjustment was made for work completed in fiscal year 
1968. 
Condition at end of fiscal year. East jetty completed in 
June 1967. Dredging was completed in April 1968. 
Construction of west jetty deferred pending determination 
of need. Controlling depths at mean low 
water were 2.3 feet in 6-foot channel and 6 feet in 6-foot 
anchorage (1969). 
2. BOSTON HARBOR, MASS. 
Location. Harbor includes all expanse of tidewater 
lying within a line from Point Allerton to Point Shirley 
and extending from that line westward to mainland. 
This comprises an area of about 47 Square miles, 
exclusive of the islands. (See Coast and Geodetic 
Survey Charts 246 and 248.) 
Previous projects. For details see Annual Reports for 
1915, 1917, 1938. 
Existing project. (a) A channel 40 feet deep in general, 
but 45 feet deep through rock, 900 feet wide, widening 
at the outer end to 1,100 feet from the sea to President 
Roads, through Broad Sound; (b) deepen main ship 
channel to 40 feet extending from President Roads to 
about 200 feet north of Mystic pier No. 1, Charlestown, 
generally 600 feet wide with suitable widening at the 
bend opposite Commonwealth pier No. 5, and 600 to 
900 feet in the upper reaches, length about 5.5 miles; 
deepening to 40 feet that part of the approach channel 
to U.S. Navy drydock at South Boston between main 
ship channel and U.S. Harbor line. (c) an anchorage 
area 2,000 feet wide, 5,500 feet long, and 40 feet deep, 
on north side of President Roads; (d) extension of 
President Roads anchorage 700 feet north and 500 feet 
to west at a depth of 40 feet and dredging an area to 35 
feet lying west of anchorage; (e) deepening to 40 feet 
that part of approach channel to U.S. Navy drydock 
No. 3 at South Boston between main ship channel and 
U.S. harbor line; (f) a channel 35 feet deep along same 
line as 40-foot main ship channel in the following 
manner; Adjacent to westerly side of 40-foot main ship 
channel through Broad Sound 600 feet wide, a distance 
of about 2 miles; adjacent to northerly side of 40-foot 
Flood Control (cont.) Page 
50G. Whitmanville Lake, Mass ....................... 39 
51. New Bedford, Fairhaven and Acushnet, 
Mass ...................... ........... 40 
52. New London, Conn ............................... 40 
53. Stamford, Conn .......................................... 41 
54. Stratford, Conn. ........................................ 41 
55. Thames River Basin, Conn., R.I. and 
M ass .............................. ..................... 42 
55A. Buffumville Lake, Mass. ........................ 42 
55B. East Brimfield Lake, Mass. ................... 42 
55C. Hodges Village Dam, Mass. ................ 43 
55D. Mansfield Hollow Lake, Conn. ............... 43 
55E. West Thompson Lake, Conn. .................. 43 
55F. Westville Lake, Mass ........................... 44 
56. Trumbull Pond Lake, Conn. ................. 44 
57. Inspection of completed flood control 
projects ........................... 44 
58. Flood control reservoir operations ........ 45 
59. Hurricane barrier operations ................ 45 
60. Other authorized flood control projects . 45 
61. Flood control work under special 
authorization ......................................... 45

NEW ENGLAND DIVISION 
main ship channel from President Roads to abreast 
Fish pier 600 feet wide, a distance of about 3 miles; 
adjacent to westerly side of 40-foot main ship channel 
from abreast Fort Point Channel to Mystic River and 
Charlestown Bridges and entrance to Chelsea River, 
having widths varying from 100 to 1,000 feet, a 
distance of about 2 miles; (g) a channel 2 miles long, 30 
feet deep, and 1,200 feet wide from sea to President 
Roads through Broad Sound by a less direct route than 
the 35- and 40-foot channels; (h) a channel 27 feet deep 
and 1,000 feet wide from Nantasket Roads to President 
Roads known as "Narrows" Channel, 3 miles; (i) a 
channel 15 feet deep, 300 feet wide, and 550 feet long 
through the bar which extends from north head of 
Long Island to Nixes Mate Shoal, known as "Nixes 
Mate" or "Nubble" Channel; (j) a channel in Chelsea 
River 30 feet deep and generally 200 feet side, from 
mouth of river, at head of 35-foot channel in Boston 
Harbor, to a point about 1 mile upstream of Chelsea 
Street Bridge, a distance of about 2 miles, thence a 
channel 8.4 feet deep to Boston & Maine Railroad 
Bridge 150 feet wide, a distance of about one-half mile; 
(k) Reserved Channel 35 feet deep and 430 feet wide 
extending about 1 mile from 40-foot main ship channel 
to L-Street Bridge; (1) Fort Point Channel, 23 feet deep 
and 175 feet wide from its entrance in Boston Harbor, 
about four-fifths of a mile to Dorchester Avenue (old 
Federal Street) Bridge; (m) seawalls of coursed stone 
and riprap protecting the most exposed headlands and 
islands; (n) a channel 12 feet deep and 150 feet wide 
from mouth of Weir River to Steamboat wharf at 
Nantasket Beach; and (o) a channel in Chelsea River 
35 feet deep, generally 225 to 250 feet wide below 
Chelsea Street Bridge and 250 to 430 feet wide above 
bridge, with a turning and maneuvering basin 35 feet 
deep, generally 800 feet wide and 1,000 feet long, 
ending about 500 feet below upstream limit of existing 
30-foot project. All depths are referred to mean low 
water. Mean range of tide is 9 feet at Boston Light, and 
9.5 feet at Commonwealth pier, in Chelsea Creek, and 
in Fort Point Channel. Extreme range is about 4 feet 
greater. A 300-foot width of project at upper end of 
channel, on East Boston side, which was included in 
40-foot channel extension authorization, was dredged 
to only 35 feet deep. This remaining portion is to be 
restudied and excluded from foregoing cost of project. 
Estimated cost (1957) of this portion is $438,000. (See 
Table 1-B at end of chapter for Acts authorizing 
existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 183 wharves and piers in 
harbor, not including Mystic, Weymouth-Fore, and 
Town Rivers, which are reported elsewhere. In 
addition, there are four ferry slips and two car floats. Of 
the terminals, 28 are publicly owned, 13 are open to 
public use, 77 have mechanical-handling facilities, and 
57 have railroad connections. Facilities are considered 
adequate for existing commerce. For a full description 
of channel facilities in Chelsea River refer to House 
Document 350, 87th Congress, 2d session (See Port 
Series No. 3, Port of Boston, Mass., dated 1956). 
Operations and results during fiscal year. Maintenance: 
Patrol boats made two trips weekly and special trips as 
required, disposing of floating debris; and noting and 
reporting observations of oil pollution. Costs were $21, 
392. Project condition surveys, field investigations, and 
other related work were conducted at a cost of $1,832. 
Condition at end of fiscal year. Existing project was 
completed in May 1966 with the construction of 
Chelsea River 35-foot channel and maneuvering basin. 
(See Table 1-C at end of chapter for total Federal cost 
of existing project to June 30, 1970.) 
3. CAPE COD CANAL, MASS. 
Location. This waterway is a sea level canal; 
extending from head of Buzzards Bay, Mass., to a point 
on Cape Cod Bay about 15 miles southeast of Plymouth 
Harbor, Mass. In general direction canal trends from 
Buzzards Bay easterly to Cape Cod Bay. (See Coast 
and Geodetic Charts 251 and 1208.) 
Existing project. Purchase of Cape Cod Canal, (March 
31, 1928), including a 600-foot stone jetty and a 3,000- 
foot stone breakwater at east end of canal at a cost to 
United States of $11,500,000; for an open canal 32 feet 
deep at mean low water, with widths of 540 feet in land 
cut, 500 feet in a straight channel in Buzzards Bay to 
Wings Neck, and 700 Feet beyond Wings Neck, 
mooring basins consisting of a basin on south side of 
Hog Island channel 4,000 feet long, with widths 
varying from 0 to 400 feet, 32 feet deep at mean low 
water, and a basin at Sandwich 3,260 feet long, with 
widths varying from 0 to 385 feet, and 25 feet deep at 
mean low water; construction of two fixed highway 
bridges with horizontal clearance of 500 feet, and a 
vertical clearance of 135 feet at mean high water; 
construction of a vertical lift railroad bridge with a 
500-foot span and 135-foot clearance above mean high 
water when span is raised; an improved lighting 
system; other accessory and minor features which may 
be deemed necessary and to be in accordance with 
plans approved by Chief of Engineers, which include a 
dike extending southwesterly 10,700 feet from Stony 
Point, a dike between Hog and Mashnee Islands, a dike 
between Hog Island and Rocky Point, a small East 
Boat Basin, 13 feet deep at mean low water on south 
bank of canal, an extension to the East Boat Basin 
covering an area of about 4.3 acres, to 8 feet deep, and 
a small West Boat Basin 18 feet deep at mean low water 
on north bank of canal; a harbor of refuge for small 
vessels by dredging a channel 150 feet wide and 15 feet 
deep at mean low water into Onset Bay and to town 
wharf in village of Onset; for enlargement of 15-foot 
turning basin at town wharf and for an anchorage 
basin of about 16 acres, 8 feet deep below mean low 
water, located contiguous to 15-foot channel and 
turning basin. 
Land cut is 7.7 miles long, and with approach 
channels, total length of canal is 17 1/2 miles. Mean 
range of tide in Cape Cod Bay at Cape Cod Canal 
entrance is 9.4 feet and in Buzzards Bay 4 feet at Cape

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Cod Canal entrance. Mean range of spring tides is 
about 13 feet in Cape Cod Bay, and 6.5 feet in 
Buzzards Bay. Minor rehabilitation of stone breakwater 
was completed in October 1963. Major 
rehabilitation of Bourne Highway Bridge was completed 
in December 1965. (See Table 1-B at end of 
chapter for Acts authorizing existing project.) 
Local cooperation; Fully complied with. 
Terminal facilities. There are four terminals on the 
canal. Three are privately owned, one used for receipt 
and freezing of fish and two for receipt and storage of 
oil. Fourth terminal is State pier, owned by Commonwealth 
of Massachusetts, and on north bank of 
canal at Bourne Neck. Terminals are adequate for 
purposes for which they are used. 
Operations and results during fiscal year. New work: 
Planning was in progress for construction of recreational 
facilities. Maintenance: Dredging by Government-
owned hopper dredge Comber to remove shoals 
in project channels was accomplished during the 
period June 15 to June 30, 1970. About 154,372 cubic 
yards of ordinary material were removed (bin 
measurement) at a cost of $98,655. Contracts were 
awarded for furnishing electronic traffic control 
equipment and modification of facilities. Work was 
started and was in progress on June 30, 1970. Contract 
costs were $39,515. Repairs to sheet steel bulkhead at 
Sandwich,.by contract, was completed on October 24, 
1969. Contract costs were $74,453. Furnishing riprap 
to repair slopes and dikes, by contract, was commenced 
early in November 1969, and completed early in 
February 1970. Contract costs were $25,707. Seal 
coating south service road, by contract, was started on 
September 23, 1969 and was completed on October 6, 
1969. Contract costs were $17,579. Evaluation and 
inspection of Sagamore Highway Bridge was completed 
in January 1970. Contract costs were $46,500. 
Structural repairs to the highway bridges was in 
progress at the close of the fiscal year. Contract costs 
were $113,600. Painting of the Sagamore Highway 
Bridge was in progress at the close of the fiscal year. 
Contract costs were $126,366. Contract cost for 
furnishing a truck-crane were $51,549. Contract costs 
for furnishing a patrol boat were $69,469. Planting of 
trees and shrubs, by contract, was in progress. Contract 
costs were $5,000. Seal coating north service road, by 
contract, was started on October 24, 1969 and was 
completed on October 31, 1969. Contract costs were 
$15,113. Contracts were awarded for the following 
items; no work was performed; furnishing a utility 
truck, an air compressor and radio telephones. 
Condition surveys, by hired labor, to determine 
channel depths, dike conditions and bank stabilization 
were made at a cost of $61,327. Work performed by 
hired labor and costs included; railroad bridge, tower 
and signal system were operated and maintained, $73, 
361; roads, highway bridges, buildings, grounds, 
utilities and project equipment maintained, $257,261; 
repairs necessary to maintain dikes, canal banks, 
dolphins, and marine structures, $12,179; real estate 
activities cost $4,782; public recreation facilities and 
areas maintained, $41,962; costs in connection with 
preparation of master plan were $9,432; traffic passing 
through canal was regulated by marine traffic 
controllers, patrol and tug boats, $405,358. 
Condition at end of fiscal year. Existing project was 
completed in February 1965, with completion of 
construction of recreational facilities. Canal is crossed 
by two high-level highway bridges and a vertical-lift 
railroad bridge. Major rehabilitation of Bourne 
Highway Bridge was completed in December 1965. 
Minor rehabilitation of stone breakwater was completed 
in October 1963. 
Canal in landcut from easterly entrance to station 
430 has a minimum bottom width of 480 feet, except 
opposite State pier where width is 450 feet. From 
station 430 to Wings Neck (Hog Island Channel) width 
is 500 feet and beyond Wings Neck (Cleveland Ledge 
Channel), 700 feet. Controlling depths at mean low 
water entering from Cape Cod Bay were; in canal land 
cut 32 feet; Hog Island Channel 32 feet; Cleveland 
Ledge Channel 32 feet (1970); 19 feet in east mooring 
basin (1969); 9 feet east boat basin (1968), and 8 feet 
east boat basin extension (1967); 26 feet in west 
mooring basin near Hog Island south side near 
dolphins (1969); 25 feet at State Pier Channel side 
(1966); 17 feet west boat basin (1959); 14.3 feet in 
Onset Bay channel from Cape Cod Canal to town 
wharf (1967); 15 feet in turning basin at town wharf 
(1967); 8 feet in Onset Bay east and west anchorage 
(1967). 
4. CHATHAM (STAGE) HARBOR, MASS. 
Location. At northeastern corner of Nantucket Sound, 
about 16 miles east of Hyannis Harbor, Mass., and 66 
miles south of Provincetown Harbor at northern 
extremity of Cape Cod. (See Coast and Geodetic 
Survey Chart 1209.) 
Previous project. For details see Annual Report for 
1942. 
Existing project. An entrance channel 10 feet deep at 
mean low water and 150 feet wide from Chatham 
Roads into upper harbor. Mean and spring tidal 
ranges are 3.6 and 4.6 feet, respectively. Federal cost of 
new work for completed project was $258,816, and $43, 
500 non-Federal, exclusive of amounts expended under 
previous project. (See Table 1-B at end of chapter for 
Acts authorizing existing project.) 
Local cooperation. Fully complied with. Total actual 
costs for all requirements under terms of project 
authorization, including required non-Federal contributions, 
$43,500. 
Terminal facilities. There are two commercial wharves 
on north side of inner harbor open to public use subject 
to owners' convenience. Facilities are adequate for 
existing commerce. 
Operations and results during fiscal year. Regular funds, 
maintenance: Engineering studies, by hired labor, for

NEW ENGLAND DIVISION 
dredging in the 10-foot entrance channel were 
completed, and contract awarded. Operations, by 
contract, commenced early in February 1970 and were 
completed in May 1970. About 30,745 cubic yards of 
ordinary material were removed. 
Condition at end of fiscal year. Construction of existing 
project was initiated in September and completed in 
October 1957, with dredging of a channel 10 feet deep 
and 150 feet wide from that depth in Chatham Roads 
to upper harbor. By 1961, a break in barrier beach 
connecting Morris and Monomoy Islands caused 
Federal Channel to fill in completely. Local interests 
dredged an emergency channel to obtain 8-foot depth 
in June 1962 and performed additional dredging in 
1963. Minimal maintenance dredging by the Federal 
Government in April and May 1964 provided access to 
inner harbor for 1964 boating season. A new 10-foot 
channel through Harding Beach and construction of a 
dike from Harding Beach to Morris Island was 
completed in July 1965. Controlling depths at mean 
low water were 10 feet in 10-foot approach channel and 
10-foot inner channel (1970). Federal costs for project 
from regular funds were $258,816 for new work and 
$727,512 for maintenance. In addition, $43,500 
expended from contributed funds for new new work. 
5. COHASSET HARBOR, MASS. 
Location. On shore of Massachusetts Bay, about 16 
miles southeast of Boston Harbor and 37 miles 
northwest of eastern entrance to Cape Cod Canal. (See 
Coast and Geodetic Survey Charts 242 and 1207). 
Previous project. For details see Annual Report for 
1904. 
Existing project. An anchorage area about 18 acres in 
inner harbor 7 feet deep, and channel 90 feet wide, 8 
feet deep from anchorage area to outer-harbor. (See 
Table 1-B at end of chapter for Acts authorizing 
existing project.) 
A project authorized under P.L. 86-645 section 107, 
1960 River and Harbor Act, as amended in 1965, 
provides for construction of anchorage areas 6 feet deep 
with 3.9 acres in Cohasset Cove, 3.3 acres west and 
south of existing anchorage, and 5.4 acres in Baileys 
Creek-total anchorage space 12.6 acres. 
Local cooperation. Fully complied with. 
Terminal facilities. There are 10 wharves in the harbor, 
2 of which are open to the public, and 5 are equipped 
with marine railways. They are considered adequate 
for present activities of harbor. 
Operations and results during fiscal year. Maintenance: 
Costs were incurred for hired labor activities in 
connection with outstanding claim. Claim remains 
outstanding. 
Condition at end offiscal year. Entrance channel 8 feet 
deep, 90 feet wide and an anchorage area 7 feet deep 
for an area of about 18 acres in the inner harbor were 
completed in July 1960. Section 107 project for 
construction of 6-foot anchorage areas was completed 
in April 1968. Rock was encountered and survey of the 
area has been completed. Controlling depths at mean 
low water were 8 feet in 8-foot entrance channel (1968); 
6.8 feet in 7-foot anchorage (1967); 6 feet in Cohasset 
Cove anchorage; 6 feet in Bailey's Creek anchorage, 
and 6 feet in anchorage west and south of 7-foot 
anchorage (1968). Commonwealth of Massachusetts 
has provided an 8-foot channel, a 6-foot anchorage 
basin, and an 800-foot breakwater. Federal costs for 
existing project from regular funds were $244,025 for 
new work, and $38,391 for maintenance. In addition, 
$100,835 were expended from contributed funds. 
6. CONNECTICUT RIVER BELOW 
HARTFORD, CONN. 
Location. Has its source in Connecticut Lake in 
northern New Hampshire, flows southerly 380 miles 
and empties into Long Island Sound at Saybrook, 
Conn., 14 miles west of New London. Hartford, now 
head of commercial navigation, is 52 statute miles, by 
channel, from mouth. (See Coast and Geodetic Survey 
Charts 215, 266, 267.) 
Previous project. For details see Annual Reports for 
1915 and 1938. 
Eightmile River, Conn., elimination as separate 
project; Provides for a channel 8 feet deep and 75 feet 
wide from deep water in Connecticut River to 
Hamburg and for turning basin of same depth, 150 feet 
wide, approximately 300 feet long at Hamburg. Project 
was adopted by River and Harbor Act of 1910. Costs 
and expenditures were $9,000 all for new work. In 
accordance with River and Harbor Act of 1950, project 
for Connecticut River below Hartford was modified to 
include project for Eightmile River, which was 
eliminated as a separate project. Aforementioned act 
also provided for an anchorage basin 6 feet deep and 
about 6.5 acres in area in upper cove at Hamburg. 
Existing project. A channel 15 feet deep at mean low 
water, 300 feet wide from mouth to Lyme Railroad 
bridge, about 3.4 miles, and thence 150 feet wide to 
Hartford, a total distance of 52 miles, channel obtained 
by dredging and construction of dikes, training walls, 
revetments, and accessory works; two riprap stone 
jetties at mouth of river, tops to be 5 feet above high 
water and 6 feet wide, easterly one about 2,300 feet and 
westerly about 2,750 feet long; for a training dike about 
3,700 feet long at Hartford, and for anchorage 11 feet 
deep about 12 acres, and one, 6 feet deep about 17 
acres, in North Cove, Old Saybrook, with an entrance 
channel 11 feet deep and 100 feet wide; for a channel 8 
feet deep, 75 feet wide about 1.5 miles long from 
Connecticut River to Hamburg; a turning basin of 
same depth 150 feet wide and 300 feet long at 
Hamburg; in Essex Cove-channel 10 feet deep, 
generally 100 feet wide and about 4,400 feet long from 
existing 15-foot Essex Shoal Channel off Essex Reef to 
and northward along Essex waterfront, then to existing

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
15-foot channel near northern end of Essex Shoal, 
anchorage of about 15 acres 10 feet deep in southern 
part of area bounded by 10- and 15-foot channels, and 
anchorage of about 19 acres 8 feet deep in northern 
part of area bounded by 10- and 15-foot channels; in 
Wethersfield Cove-channel at entrance 6 feet deep, 
generally 60 feet wide, and 30-acre anchorage 6 feet 
deep. Mean tidal range is 3.5 feet at mouth,-and at 
summer stage is about 1 foot at Hartford. Maximum 
tidal range at mouth due to wind or other causes, is 8 
feet or more. At Hartford usual rise due to spring 
freshets is between 16 and 24 feet above mean low 
water. Maximum recorded freshet at Hartford (Mar. 
1936) was 35.5 feet above mean low water. Below 
Middletown the height of crest of freshet decreases 
rapidly. 
Dredging 6-foot channel, turning basin, and 
anchorage area at Hamburg to 6 feet deep, about 6.5 
acres in area in Eightmile River portion of project is 
considered inactive and excluded from foregoing 
estimate. Estimated Federal cost of this portion (1956) 
is $57,000. Major rehabilitation will be required for 
five bank revetments on Connecticut River below 
Hartford, Conn., from Glastonbury Upper Bar, mile 42 
to Claybanks Upper Bar, mile 49. Studies are in 
progress. Latest approved estimated Federal cost of 
rehabilitation is $640,000. (See Table 1-B at end of 
chapter for Acts authorizing existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. On both Connecticut and 
Eightmile Rivers there are two or three wharves at 
each of river towns, one or more in each town being 
open to public use. At Hartford and Middletown there 
is about one-half of wharf frontage along west bank of 
river. Facilities adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Engineering studies, by hired labor, were completed for 
dredging to 15 feet-River Bars-Calves Island, 
Brockway, Potash, Higgonum, Haddam Island, Pistol 
Pt., Glastonbury, Two Piers, Glastonbury Upper and 
Naubuc. Contract was awarded. Costs were $76,801. 
Condition survey was made of fourteen additional bars 
below Hartford at a cost oft$13,096. 
Major rehabilitation. Engineering studies, by hired 
labor, were continued for rebuilding five bank 
revetments on Connecticut River below Hartford from 
Glastonbury Upper Bar, mile 42, to Claybanks Upper 
Bar, mile 49. 
Condition at end of fiscal year. Except for inactive 
portion, existing project was completed in September 
1965, with the construction of channel and anchorage 
in North Cove, Old Saybrook, Conn. 
The 15-foot channel from mouth to Hartford was 
completed in 1937. Saybrook jetties and training walls 
at Hartford, Clay Banks, and Sears Shoal were 
completed in 1915. Stone dikes and timber spurs at 
Pistol Point, Glastonbury, Press Barn, Naubuc, Cys 
Hollow, and Clay Banks were completed in 1927 and 
those at Wethersfield in 1947. Timber-pile dikes at 
Press Barn were completed in 1940 and at Press Barn, 
Glastonbury (including two piers), and Gildersleeve 
Island reaches have been revetted. Repairs to jetties at 
Saybrook and repairs to revetment at Glastonbury 
were made in 1960. Studies were in progress for major 
rehabilitation of five bank revetments from 
Glastonbury Upper Bar, mile 42, to Claybank Upper 
Bar, mile 49. Head of commercial navigation is at 
Hartford, 52 miles by channel from mouth. A dam at 
Holyoke, Mass., 34 miles above Hartford, completely 
interrupts navigation. Controlling depths at mean low 
water are generally 12.5 feet for mid-channel widths 
from Saybrook to Hartford; 11 feet in entrance channel 
to North Cove; 11 feet in 11-foot anchorage and 6 feet 
in 6-foot anchorage (1965); 6.0 feet in entrance 
channel to Wethersfield Cove (1968) and 6 feet in 
anchorage (1965); 8.0 feet in channel at Essex Cove, 10 
feet in 10-foot anchorage and 8 feet in 8-foot anchorage 
(1965); 4.5 feet in channel and basin in Eightmile 
River (1965); 1 to 6 feet in anchorage at Hamburg 
(1946). 
Federal costs for existing project from regular funds 
were $1,253,811 for new work, which includes $9,000 of 
completed new work (existing project) transferred from 
Eightmile project, $4,003,003 for maintenance, and 
$36,249 for major rehabilitation. In addition, $130,410 
expended from contributed funds. 
7. FALL RIVER HARBOR, MASS. 
Location. At mouth of Taunton River, on east'side 
and at head of Mount Hope Bay, which empties into 
ocean through Narragansett Bay and Sakonnet River; 
it is about 18 miles northerly from Newport Harbor. 
(See.Coast and Geodetic Survey Chart No. 353) 
Previous Projects. For details see Annual Reports for 
1915 and 1938. 
Existing Project. Channel 40 feet deep, 400 feet wide 
from deep water in Mount Hope Bay easterly into 
Tiverton lower pool, thence northerly and southerly 
along Tiverton waterfront to Gulf Oil Co. wharf and 
Bay Oil Co. wharf respectively; and for a channel 40 
feet deep, 400 feet wide from deep water in Mount 
Hope Bay to Globe wharf thence to wharves above 
bridge with increased width at bends; turning basin 40 
feet deep, about 1,100 feet wide and 850 feet long above 
bridge between Shell and Montaup wharves; removal 
to 30 feet of lower end of Hog Island Shoal; 
maintenance of 25-foot anchorage, west of harbor 
channel; channel 30 feet deep and generally 300 feet 
wide extending about one mile below Slades Ferry 
Bridge, east of harbor channel and alteration of 
Brightman Street Bridge to provide for a clear channel 
width of 300 feet through the drawspan. 
Mean tidal range is 4 feet, Bristol Point, and ;4 feet, 
Fall River, and maximum range, due to combined 
effect of wind and other causes, is 8 feet or more. Total 
estimated Federal cost for new work is $15,300,000

NEW ENGLAND DIVISION 
exclusive of $4,438,204 for new work completed before 
1959 and amounts expended on previous projects. 
Portion of project for removal of rock at Hog Island 
shoal is considered inactive and excluded from cost of 
new work. Cost of this portion estimated to be $185,000 
(1954). (See Table 1-B at end of chapter for Acts 
authorizing existing project.) 
Local cooperation. Fully complied with for completed 
work. Terms of local cooperation pertinent to 
remaining work authorized by River and Harbor Act 
of 1968 are; provide all lands, easements, rights-of-way 
required for construction and maintenance, and for 
aids to navigation upon request; hold United States 
free from damages due to construction and 
maintenance; provide and maintain adequate depths 
in approach channels and berthing areas 
commensurate with project depths; make necessary 
alterations to underwater utilities; remove existing 
Slades Ferry Bridge and alter or reconstruct the 
Brightman Street Bridge, assuming a share of the costs 
in accordance with principles of the Truman-Hobbs 
Act at an estimated cost to local interests of $1,800,000. 
Formal assurances will be requested during final 
design. The Commissioner, Massachusetts Department 
of Public Works signed an agreement with the Division 
Engineer on December 16, 1966 that establishes the 
cost apportionment for bridge alterations, utilizing the 
principle of Truman-Hobbs Act. 
Terminal facilities. In upper harbor there are several 
deep-draft terminals, two of which are in Somerset and 
four in Fall River; four more deep-draft terminals are 
located along the Tiverton waterfront in Rhode Island. 
These are modern terminals used in connection with 
electrical generating stations; receipt, distribution and 
storage of oil and petroleum products; and a State Pier 
for handling general cargo, and a permanent berth for 
the battleship "Massachusetts." There are ten other 
wharves with berthing depth of less than 25 feet used 
for mooring recreational and training craft, receipt and 
storage of petroleum products, boat servicing and 
repairs. For details see H. Doc. 175, 90th Cong., 1st sess. 
Operations and results during fiscal year. New work: 
Engineering studies, by hired labor, were started for 
deepening Mount Hope Bay and Tiverton channels to 
40 feet. Maintenance: Costs in the amount of $4,928 
were incurred on monitoring operations for removal of 
the Slades Ferry Bridge. 
Condition at end offiscalyear. Planning was initiated for 
deepening Mount Hope Bay and Tiverton channels to 
40 feet. Controlling depths at mean low water were 
32.5 feet in 35-foot main ship channel, 400 feet wide 
through Mt. Hope Bay, then 35 feet to the wharves 
above the bridge (1963) 35 feet in 35-foot turning basin 
(1963), 35 feet in 35-foot channel to Gulf Oil Co. 
Wharf (1962), 35 feet in vicinity of Common Fence 
Point (1965), 19 feet in 25-foot anchorage (1960), 20 
feet on Hog Island Shoal at west edge of channel (1940). 
All work for projects authorized prior to 1968 was 
completed in March 1959. Total Federal costs for 
existing project from regular funds were $4,526,316 for 
new work, and $809,164 for maintenance. 
8. GLOUCESTER HARBOR AND 
ANNISQUAM RIVER, MASS. 
Location. Gloucester Harbor is at southern extremity 
of Cape Ann, about 23 miles northeast by water from 
Boston Harbor. Annisquam River is a narrow tidal 
waterway extending across base of Cape Ann from 
Gloucester Harbor on south side to Ipswich Bay on 
northside, a distance of approximately 4 miles. A reach 
of this waterway, at Gloucester Harbor end, for a 
length of about 1,800 feet, is known as Blynman Canal. 
(See Coast and Geodetic Survey Chart 243.) 
Previous projects. For details see Annual Reports for 
1915, and 1937. 
Existing project. Gloucester Harbor provides; (a) A 
rubblestone breakwater 2,250 feet long, surmounted by 
a superstructure of dry walls of heavy split stone 
inclosing a core of rubblestone from Eastern Point over 
Dog Bar to Cat Ledge; (b) removal of three ledges in 
inner harbor, 1 to 12 feet and 2 to 15 feet depth at mean 
low water, and five ledges in outer harbor, 4 to 18 feet 
and 1 to 25 feet depth at mean low water, aggregating a 
total of 2,206 cubic yards, place measurement; (c) 
removal to 15 feet deep below mean low water of ledges 
and boulders obstructing approach to wharves between 
Harbor Cove and Pews wharf, near head of inner 
harbor; dredging to same depth channel leading past 
wharves and dredging Harbor Cove to 10 feet deep at 
mean low water; (d) an entrance channel into Inner 
Harbor 300 feet wide and 20 feet deep, with a turning 
basin 600 feet wide; (e) an access channel, 200 to 250 
feet wide and 20 feet deep, along waterfront to 
northwest of Gloucester Fish pier; (f) an access 
channel, 200 feet wide and 20 feet deep, along 
waterfront southeast of Gloucester Fish pier; (g) an 
access channel 650 to 300 feet wide and 16 feet deep 
extending into Smith Cove; (h) an access channel, 
varying from 500 to 100 feet wide and 18 feet deep, 
along waterfront west of Harbor Cove and into Harbor 
Cove; (i) an anchorage of about 5 acres, 15 feet deep, 
east of entrance to Harbor Cove; (j) an anchorage of 
about 10 acres, 16 feet deep, opposite entrance to Smith 
Cove; and (k) removal of isolated rock shoal adjacent 
to entrance channel south of Harbor Cove to 24 feet 
deep. Annisquam River provides for a channel 8 feet 
deep at mean low water 60 feet wide from Gloucester 
Harbor to Boston & Maine Railroad bridge, 100 feet 
wide from railroad bridge to mouth of river, and 200 
feet wide across bar in Ipswich Bay, including removal 
of a ledge near Gloucester Harbor entrance; and a 
dredged anchorage area about 17 acres in extent and 8 
feet deep at entrance of Lobster Cove. Project depths 
refer to mean low water. Mean range of tide in 
Gloucester Harbor is 8.7 feet; extreme range is 12.6 
feet. Mean range of tide in Annisquam River is 8.5 feet;

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
extreme range is about 10 feet. (See Table 1-B at end of craft has been developed on south side of harbor near 
chapter for Acts authorizing existing project.) head of navigation. 
Local cooperation. Fully complied with. 
Terminal facilities. In Gloucester Harbor, 75 piers and 
wharves, 90 percent of which are used in some 
connection with the fishing industry. Of these, two are 
owned by the city. Fish pier is owned by Massachusetts 
and leased to city. All others are privately owned, and 
not available to the public. There are also two 
commlercial wharves on east bank of Annisquarm River. 
There are no railroad sidings available. Facilities are 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Contract was awarded for dredging in the Annisquam 
River to a depth of 8 feet in the :river and Ipswich Bar 
channels. Operations were commenced and 
substantially completed in June 1970. About 7,500 
cubic yards of ordinary material were removed. 
Condition at end of fiscal year. Existing project was 
completed in July 1965. Controlling depths over ledges 
in outer harbor in 1916 were 18 to 25 feet; in 1965-20 
feet in 20-foot inner harbor entrance channel and 
turning basin; 20 feet in 20-foot north channel; 20 feet 
in 20-foot south channel; 16 feet in 16-foot inner 
harbor anchorage; 18 feet in 18-foot channel to harbor 
cove; 16 feet in 16 foot anchorage at entrance to Smith 
Cove; 15 feet in 15-foot anchorage east of Harbor 
Cove; 5.0 feet in Annisquam River channel from 
Ipswich Bay to Gloucester Harbor; 7.1 feet in Outer 
Bar, Ipswich Bay (1969) and 8 feet in Lobster Cove 
anchorage (1958). Federal costs for existing project 
from regular funds were $1,275,934 for new work, and 
$699,367 for maintenance. In addition $25,000 
expended from contributed funds. 
9. GREEN HARBOR, MASS. 
Location. On west side of Massachusetts Bay, within 
the town of Marshfield, about 30 miles southeast of 
Boston and 9 miles north of Plymouth Harbor. (See 
Coast and Geodetic Survey Chart 245.) 
Existing project. Provides for channel 6 feet deep (8 
feet at entrance), 100 feet wide extending about 4,000 
feet from deep water to head of navigation, with small 
turning basin at upstream limit; 5-acre anchorage near 
Town pier, 6 feet deep; sealing, rebuilding in part, and 
a 200-foot extension of existing west jetty at elevation 
+ 12, with dike to beach berm at elevation + 14 feet, 
and raising east jetty to elevation + 14. Estimated 
project costs are $427,000, of which $164,000 is non- 
Federal. (See Table 1-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. Major terminal facility is Town 
pier in village of Brant Rock. Facility is a bulkheaded, 
earth-filled landing and parking area about 290 feet 
wide, extending 210 feet into harbor. A marine service 
is south of Town pier; and a facility for recreational 
Operations and results during fiscalyear. New work: Work 
on west jetty was completed in August 1969. 
Construction of east jetty was commenced on July 21, 
1969, and completed on October 6, 1969. 
Maintenance: Dredging in the 8-foot entrance channel 
and 6-foot harbor channel, anchorage and basin was 
commenced on October 5, 1969 and completed on 
December 3 1969. About 35,984 cubic yards of 
ordinary material were removed; and unclassified 
material to a depth of 8 feet below mean low water was 
removed and disposed of. 
Condition at end of fiscal year. Construction of existing 
project commenced in July 1968 and was completed in 
October 1969. Controlling depths at mean low water 
were; 8 feet in 8-foot channel (1969); 6 feet in 6-foot 
channel (1969); and 6 feet in 6-foot anchorage and 
turning basin (1969). 
10. -HAMPTON HARBOR, NH. 
Location. On New Hampshire seacoast 13 miles south 
of Portsmouth Harbor, 5 miles north of mouth of 
Merrimack River at Newburyport, Mass. (See Coast 
and Geodetic Survey Chart 1206.) 
Existing project. Extending north jetty 1,000 feet, 
raising outer 300 feet of south jetty and constructing a 
180-foot spur to high ground, and dredging to provide 
a channel 8 feet deep and 150 feet wide across entrance 
bar. Mean tidal range is 8.3 feet and spring range is 9.5 
feet. (See Table I-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are six piers in Hampton 
Harbor. State of New Hampshire maintains two pile 
and timber piers, one in Hampton about 1;5 00 feet 
north of entrance and one in Seabrook one-half mile 
south of entrance. Hampton: pier has a 6-foot walkway 
to a float that has depths of 4 to 6 feet. Seabrook pier 
has no float and a water depth of about 3 feet at outer 
end. Both landings are open to public. Facilities are 
adequate for existing commerce. 
Operations and results duringfiscal year. Maintenance; 
Costs, in hired labor, were incurred for studies for 
repairs to north jetty extension and spurs. 
Condition at end of fiscal year. Existing project was 
completed in November 1965. Controlling depths at 
mean low water were 8.0 feet in entrance channel 
(1968). 
11. HARBOR OF REFUGE, BLOCK 
ISLAND, RI. 
Location. On east side of Block Island, near south end 
of inner curve of shoreline, 13 miles south-southwest 
from Point Judith Harbor and about 25 miles 
southeasterly from Stonington Harbor, Conn. (See 
Coast and Geodetic Survey Chart 276.)

NEW ENGLAND DIVISION 
Existing project. Rubblemound breakwater extending 
northerly about 1,950 feet from shore; a similar 
breakwater about 1,100 feet long, extending northerly 
and easterly, inclosing, with main breakwater, an area 
about 800 feet square designated as inner harbor; 
masonry walls in southeastern corner of inner harbor 
inclosing an area nearly 300 feet square designated as 
the basin; and for dredging to a depth of 15 feet at 
mean low water about 67 percent of inner harbor and 
basin; a jetty about 140 feet long southeast of main 
breakwater with a T-head 100 feet across. Mean tidal 
range is 2.9 feet, and maximum range, due to combined 
effects of wind and other causes, is 7 feet or more. 
Dredging of outer harbor west of entrance channel 
portion of project is considered inactive and excluded 
from foregoing costs. Estimated cost of this portion is 
$49,000. (See Table 1-B at end of chapter for Acts 
authorizing existing project.) 
Local cooperation. None required. 
Terminal facilities. Only wharf in harbor is steel 
sheetpile bulkhead which comprises southern and 
eastern limits of basin. Total docking space amounts to 
500 feet. No mechanical-handling facilities are 
available. Wharf, owned by town and open to public, is 
considered inadequate for present general needs of 
boating in harbor. There is ample room for expansion 
of terminal facilities. 
Operations and results during fiscal year. Maintenance: 
Engineering studies, by hired labor, were completed for 
repairs to steel sheet piling bulkhead. Contract was 
awarded in June 1970. 
Condition at end of fiscal year. Existing project was 
completed in 1916. Required repairs to breakwater 
and harbor walls were completed in March 1963. 
Controlling depths at mean low water were 15 feet in 
15-foot entrance channel (1968); 15 feet in inner basin 
(1968); 15 feet in inner harbor anchorage (1968) and 6 
to 14 feet in outer protected area (1931). 
12. HOUSATONIC RIVER, CONN. 
Location. Rises in northwestern Massachusetts, flows 
southerly 130 miles through Massachusetts and 
Connecticut, and empties into Long Island at 
Stratford, 5 miles east of Bridgeport Harbor. (See Coast 
and Geodetic Survey Chart 219.) 
Existing project. A channel 18 feet deep at mean low 
water and 200 feet wide from the mouth to the lower 
end of Culvers Bar, about 5 miles, and thence 7 feet 
deep and 100 feet wide to Derby and Shelton, about 8 
miles; a riprap breakwater at the mouth, consisting of 
an inner arm, 3,250 feet long, 3 feet high above mean 
low water, top width 6 feet, side slopes 1 on 1, and an 
outer arm 2,571 feet long, 6 feet high above mean high 
water, inner slope 1 on 1; riprap dike in the river below 
Stratford not to exceed 1,500 feet in length; and a 
riprap jetty 163 feet long at Sow and Pigs Rocks. The 
mean tidal range, exclusive of the winter season and 
freshets, is 6.7 feet at the mouth, 5.5 feet at Stratford, 
and 5 feet at Shelton; the extreme range due to 
combined effect of wind and other causes is about 11 
feet at the mouth, diminishing toward the head. The 
spring freshets occasionally rise to a height of 18 feet or 
more above summer low water, but only average about 
12 feet above that datum. The Federal cost of new work 
for the completed project was $859,691, and $222,010 
non-Federal. The enlargement of the outer arm of the 
breakwater to provide a top width of 12 feet and an 
outer slope of 1 on 2, and the extension of the Stratford 
dike not more than 245 feet long are both portions of 
the existing project considered to be inactive and are 
excluded from the foregoing cost. The cost of this 
portion was last revised in 1954 and was estimated to be 
$100,000. (See Table 1-B at end of chapter for Acts 
authorizing existing project.) 
Local cooperation. Fully complied with. Total actual 
costs for all requirements of local cooperation under 
terms of the project authorization, including required 
non-Federal contributions amount to $167,010 plus 
$55,000 in lieu of suitable bulkhead areas to be 
contributed by local interests. 
Terminal facilities. There are 6 wharves for 
commercial use at Stratford, 1 at Devon, and 8 at 
Shelton and Derby. The facilities are considered 
adequate for the existing commerce. 
Operations and results during fiscal year. Regular funds, 
maintenance: Costs, in hired labor, were incurred for 
studies for dredging the 18-foot river channel to 
Culvers Bar. 
Condition at end of fiscal year. The existing project was 
fully completed in September 1957, with the dredging 
in the vicinity of the old State of Connecticut 
Washington Street Highway Bridge piers. The 18-foot 
channel from the mouth of the river to Culvers Bar was 
completed in September 1956. The upriver channels 
were completed in 1893. The breakwater at the mouth 
was completed in 1914 except that the outer arm has a 
top width of 8 feet and outer slope of 1 on 1.5 instead of 
project dimensions; the Stratford dike was completed 
to its present length of 1,225 feet in 1916, and the jetty 
at Sow and Pigs Rocks was completed in 1871. The 7- 
foot channel above Culvers Bar requires maintenance 
dredging to restore project dimensions The breakwater 
is in good condition and the dike and jetty in fair 
condition. The head of navigation is at Derby and 
Shelton, about 14 miles by channel above the mouth. 
The controlling depths at mean low water were as 
follows; From Housatonic River, Light No. 1 to 
Washington St. Bridge 16 feet (1969) except shoaling to 
9 feet at bends. Thence to Lower end of Culvers Bar 15 
feet (1969); thence 3 feet through Drews Bar (1969); 
thence 3 feet to upstream limit of the Federal project 
(1960.) 
13. KENNEBUNK RIVER, MAINE 
Location. Source of Kennebunk River is in central 
part of York County in southwestern Maine. Stream

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
flows about 15 miles southeasterly and discharges into 
Atlantic Ocean about 30 miles southwest of Portland, 
Maine. (See Coast and Geodetic Survey Chart 1205.) 
Existing project. A stone breakwater on easterly side of 
mouth of river about 550 feet long, a pier or jetty on 
westerly side of mouth about 290 feet long, a wharf 
about 700 feet upstream from shore end of breakwater 
(transferred to Treasury in 1936), a jetty on east bank a 
short distance farther upstream, a channel 8 feet deep 
and 100 feet wide extending 1,700 feet from deep water 
to town landing, thence 6 feet deep over a width of 100 
feet for 2,300 feet and a width of 75 feet for remaining 
2,000 feet to project limit; an anchorage, 4 acres in 
area, on west side of channel and an anchorage, 2 acres 
in area, on east side, each 6 feet deep; and extension of 
west jetty by about 300 feet, supplemented by 
construction of a sand fence. Mean tidal range is 9 feet; 
extreme 13.5 feet. (See Table 1-B at end of chapter for 
Acts authorizing existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 22 landings, 16 of which 
are private, 1 public, 2 yacht clubs, 1 hotel, and 2 
boatyards. Marine railway facilities include two of 15- 
ton capacity, and one of 10-ton capacity. There are 4 
berths and 10 moorings. Open storage, boat building, 
repairs, and supplies are available for pleasure and 
commercial craft. Public landing, of granite block 
construction, has unloading facilities which include 
two tackle and falls on arms; and is used by fishing craft 
to transfer catches for transportation. Facilities are 
adequate for existing commerce. 
Operations and results during fiscalyear. New work: Fund 
adjustment was made. Maintenance: Repairs to two 
damaged sections of east breakwater were commenced 
late in July 1969, and completed early in October 1969. 
About 5,379 tons of stone were placed. 
Condition at end of fiscal year. Project was completed in 
December 1968, with the completion of rock removal 
at entrance to west channel. Extension of west jetty was 
completed in April 1965; and improvement dredging 
in the 6 and 8-foot channels, 6-foot anchorages, and 
construction of a sand fence were completed in 
November 1965. Controlling depths at mean low water 
were; 8 feet in 8-foot channel; 6 feet in 6-foot channel; 
6 feet in west anchorage, and 6 feet in east anchorage 
(1968). 
14. LAGOON POND, MARTHA'S 
VINEYARD, MASS. 
Location. In Town of Tisbury on north shore of 
Martha's Vineyard, an island 3 miles off the southern 
coast of Cape Cod, Massachusetts. (See Coast and 
Geodetic Survey Chart 264). 
Existing project. Entrance channel 8 feet deep, 100 feet 
wide from deep water in Vineyard Haven Harbor 
leading into the natural deep water anchorage in 
Lagoon Pond and seaward extension of existing jetty at 
entrance for a distance of 200 feet. Mean range of tide 
is 1.7 feet and spring range is 2.0 feet. Total estimated 
cost (1970) is $214,100, of which $98,000 is non- 
Federal cost. (See Table 1-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Local interests are required to make 
a cash contribution of 50 percent of project 
construction cost, estimated at $80,000; provide and 
maintain public landing, access roads, parking areas 
and other public use facilities open to all on equal 
terms; hold United States free from damages; provide 
without cost lands, easements and rights-of-way; 
regulate use, growth and development of harbor, open 
to all on equal terms; establish regulations prohibiting 
discharge of untreated sewage, garbage, and other 
pollutants in the waters of Lagoon Pond. 
Terminal facilities. Except for two boatyards located at 
its north end, Lagoon Pond has no terminal facilities. 
Most of the terminals servicing the Tisbury-Oak Bluffs 
area are located at southeast end of Vineyard Haven 
Harbor. 
Operations and results during fiscal year. New work. 
Engineering studies, by hired labor, were continued for 
construction of entrance channel. 
Condition at end of fiscal year. Construction of existing 
project has not been started. Controlling depths at 
mean low water were 3.6 feet (1966). 
15. MENEMSHA CREEK, MARTHA'S 
VINEYARD, MASS. 
Location. South side of Vineyard Sound about 13 
miles southwest of Woods Hole, Mass. (See Coast and 
Geodetic Survey Chart 1210.) 
Existing project. Entrance channel 10 feet deep and 80 
feet wide between jetties to and including anchorage 
basin 10 feet deep in wide northern portion and 6 feet 
deep in narrow southern end, and channel 8 feet deep 
and 80 feet wide through Menemsha Creek to deep 
water in Menemsha Pond, about 1.1 miles from 
entrance, and for maintenance of existing jetties. All 
depths refer to mean low water. Mean and spring tidal 
ranges at entrance are 2.7 and 3.4 feet, respectively. 
Latest published map is in project document (H. Doc. 
365, 76th Cong., 1st sess.). (See Table 1-B at end of 
chapter for Act authorizing existing project.) 
Local cooperation. Fully complied with. 
The Commonwealth of Massachusetts and local 
interests have expended over $202,000 for 
improvements and maintenance of Menemsha Creek 
and its entrance. 
Terminal facilities. The town wharf on the basin has a 
bulkheaded frontage of about 600 feet. Other public 
and private landings are available. Facilities are 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Repairs to west jetty, by contract, were commenced 
late in August 1969, and all work was completed on 
November 13, 1969. About 2,631 tons of cover stone 
10

NEW ENGLAND DIVISION 
and 2,953 tons of seal stone were placed. Costs were 
$73,538. Project condition survey was conducted in 
May 1970. Costs were $4,938. 
Condition at end of fiscal year. Existing project was 
completed in 1950. Controlling depths at mean low 
water (1970) were 10 feet in 10-foot entrance channel 
except 4 feet in left outside quarter opposite end of 
north jetty; 10 feet in 10-foot anchorage except 9-foot 
bar across entrance to anchorage; 6 feet in 6-foot 
anchorage and 4 feet in 8-foot channel to Menemsha 
Pond. 
16. NEW HAVEN HARBOR, CONN. 
Location. On north shore of Long Island Sound, about 
67 miles to east of New York City. (See Coast and 
Geodetic Survey Chart 218.) 
Previous projects. For details, see Annual Reports for 
1915 and 1938. 
Existing project. A main channel 35 feet deep, 400 to 
800 feet wide, from Long Island Sound to Tomlinson 
Bridge; two anchorage basins below Tomlinson Bridge 
of 16- and 15-foot depths; a pile-and-riprap dike about 
4,200 feet long, to contract tidal flow at Fort Hale bar; 
a channel 12 feet deep and 100 to 150 feet wide, from 
southwest corner of 16-foot anchorage basin via City 
Point and West Haven wharf front to Kimberly 
Avenue Bridge; thence 12 feet deep and prevailing 
width of 75 feet up West River to about 600 feet 
upstream of Kimberly Avenue Bridge, and an 
anchorage basin 6 feet deep in West River opposite 
Mars wharf; a channel 100 feet wide and 12 feet deep 
from 15-foot anchorage basin toward Brewery Street, 
about 300 feet; a channel in Quinnipiac River 22 feet 
deep and 250 to 400 feet wide to a point about 1,000 
feet above Ferry Street, thence 16 feet deep and 200 
feet wide to Grand Avenue, with turning basin 22 feet 
deep, 200 to 800 feet wide, and 700 feet long at mouth 
of Mill River; a channel up Mill River 12 feet deep, 
200 feet wide to junction of two branches above Chapel 
Street, thence to Grand Avenue, 100 feet wide in East 
Branch and generally 125 feet wide in West Branch; 
and removal of certain obstructive rocks in Morris 
Cove. Mean range of tide is 6.2 feet at entrance to 
harbor, and 6.3 feet at Long Wharf Light. The 22-foot 
channel and turning basin portion is to be restudied 
and excluded from foregoing cost estimate. Estimated 
cost (1960) of this portion is $980,000. (See Table 1-B 
at end of chapter for Acts authorizing existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. Port of New Haven is served by 53 
waterfront facilities; 48 are within city limits of New 
Haven, and 5 in West Haven. Improved waterways 
within port area along which facilities are located 
include West River, Main Harbor, West and East 
Branches of Mill River, and Quinnipiac River 
channels. Facilities are all privately owned and 
operated with exception of city wharf. Depths 
alongside piers and wharves range from 35 to zero feet 
at mean low water. Nearly half of the facilities have rail 
connections either on or at rear which connect with 
New York, New Haven & Hartford Railroad and most 
are accessible by paved streets. Nineteen wharves have 
mechanical-handling facilities, six wharves are open to 
public use upon agreement with the owners. Facilities 
are adequate for existing commerce. (For further 
details, see Port and Terminal Facilities of Southern 
New England No. 4 revised in 1952.) 
Operations and results during fiscal year. Maintenance: 
Investigation of existing conditions in the 12-foot Mill 
River channel and 35-foot Main channel to determine 
the substance of material deposited in the river and its 
source, was continued. Costs were $7,122. Project 
condition survey was conducted in Main Entrance 
Channel, Long Wharf Anchorage, and West River 
Channel and Anchorages, at a cost of $19,105. 
Condition at end of fiscal year. Existing project is 
complete. Controlling depths at mean low water were; 
35-foot Main Ship Channel from Long Island Sound to 
a Point opposite Sandy Point Breakwater Lights, 32 
feet in left outside quarter, 35 feet in middle half, 31 
feet in right outside quarter; thence upstream to 1,400 
feet below Tomlinson Bridge, 32 feet in left outside 
quarter, 35 feet in middle half, 30 feet in right outside 
quarter; thence upstream to Tomlinson Bridge 15 feet 
(March 1970). Long Wharf Anchorage adjacent to 
Main Ship Channel, 16 feet in easterly third, 10-16 feet 
in middle third, and 2 feet in westerly third of 
anchorage (July 1969); West River Channel from 
Buoy 15 to Buoy 18, 8.1 feet in left outside quarter; 
thence upstream to limit of Federal project, 3.1 feet in 
left outside quarter, 5.7 feet in middle half, 5.3 feet in 
right outside quarter; 4.0 feet in West River Anchorage 
(August 1969); other depths for Mill River and 
Quinnipiac River same as FY 69 report. Federal costs 
for existing project from regular funds were $3,873,620 
for new work and $3,665,647 for maintenance. 
17. NEWBURYPORT HARBOR, MASS. 
Location. On south bank of Merrimack River, about 
2.5 miles above mouth, and about 48 miles by water 
north of Boston. (See Coast and Geodetic Survey Chart 
331.) 
Existing project. Two jetties, one projecting 4,118 feet 
from the north shore, the other projecting 2,445 feet 
from the south shore, converging until 1,000 feet apart, 
then extending seaward 1,000 feet parallel to axis of 
channel; partially closing Plum Island Basin by a 
timber dike; channel 12 feet deep and 400 feet wide 
through bar, thence 9 feet deep and 200 feet wide to 
and including a widened turning basin in front of 
wharves. Mean range of tide is 7.9 feet at the bar and 
7.8 feet at Newburyport. Portion of project for 
continuous channel from sea to wharves at 
Newburyport, 15 feet deep and 200 feet wide to and 
including a widened turning basin in front of wharves 
is considered inactive and excluded from foregoing cost 
11

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
for new work. Estimate (June 1955) was $106,000. 
Estimate (1970) for reconstruction of north jetty is $1, 
070,000 (Federal funds). (See Table 1-B at end of 
chapter for Acts authorizing existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. Sixteen wharves extending along a 
frontage of about 3,500 feet of south bank of 
Merrimack River below highway bridge and one small 
pier onr north side of river. Terminal facilities are 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Engineering studies, by hired labor, continued for 
extending existing jetties at entrance to harbor 
seaward. Engineering studies, by hired labor, -were 
completed for removal of shoals in inner harbor. 
Contract was awarded in June 1970. Engineering 
studies, by hired labor, were completed for erosion 
repairs in the vicinity of the Coast Guard Station, Plum 
Island. Contract was awarded; work commenced and 
was in progress on June 30, 1970. About 1,580 tons of 
armor stone and 5,400 tons of core and bedding stone 
have been placed. 
Major rehabilitation: Contract was awarded for 
reconstruction of north jetty and work was commenced 
in June 1970. About 1,600 tons of stone have been 
placed. 
Condition at end of fiscal year. Existing project was 
completed in August 1958, with the improvement of 
12-foot channel and outer harbor. North jetty was 
completed in 1914; south jetty was completed, except 
for a length of about 30 feet at its outer end, in 1905. 
Required rehabilitation of these jetties was in progress. 
Plum Island basin was partially closed in 1883 by 
construction of a timber dike. North Rock was removed 
in 1901. Controlling depths at mean low water were; 
12-foot channel 9.4 feet in middle half, 8.9 feet in left 
quarter and 12 feet in right quarter (1969); 9-foot 
channel and turning basin 9 feet in channel and 6 feet 
in turning basin (1968). 
18. NIANTIC BAY AND HARBOR, CONN. 
Location. On north shore of Long Island Sound about 
5.5 miles west of entrance to New London Harbor and 
9 miles east of mouth of Connecticut River. 
Existing project. Provides for channel 8 feet deep, 100 
feet wide from deep water in the bay to the highway 
bridge; thence 6 feet deep, 100 feet wide to deep water 
south of Sandy Point. Estimated project cost is $128, 
300, of which non-Federal costs are $63,500. (See 
Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Compliance with requirements of 
local cooperation were completed. Cash contribution of 
$67,500 has been received. 
Terminal facilities. Three major concentrations of 
boating facilities at Niantic Village, Smith Cove and 
between the bridges and vicinity of Mago Point are 
located in the harbor. These facilities include pile and 
timber piers and berthing slips, dry storage for boats, 
launching ramps for small craft; wharves, open 
moorings, a 20-ton railway, 6-ton crane, and 4-ton 
travel lift. 
Operations and results during fiscal year. New work: Work 
for construction of channels 8 and 10 feet deep was 
readvertised; satisfactory bid received; and contract 
was awarded. Work was in progress on June 30, 1970. 
About 19,000 cubic yards of ordinary material have 
been removed and contract is 61 percent complete. 
Condition at end of fiscal year. Construction is in 
progress. 
19. NORWALK HARBOR, CONN. 
Location. On north shore of Long Island Sound, about 
40 miles east of New York City. (See U.S. Coast and 
Geodetic Survey Charts Nos. 221 and 1213.) 
Previous projects. For details see Annual Reports for 
1915 and 1938. 
Existing project. Provides for channel 12 feet deep from 
outer harbor to highway bridge- at South Norwalk, 
about 3.1 miles, being 200 feet wide to Gregory 
(Dorlon) Point, thence 150 feet wide to South Norwalk, 
and 250 feet wide along South Norwalk wharves; 
thence channel 10 feet deep and generally 100 feet 
wide to a 6-foot basin at head of navigation at Norwalk 
about 1.5 miles; an anchorage basin 10 feet deep and 
about 17 acres in area opposite Fitch Point; channel 6 
feet deep from 10-foot anchorage to East Norwalk, 125 
feet wide to bend beyond Third Street, thence 150 feet 
wide to the head, a total distance of 2,900 feet; and for 
an irregular-shaped anchorage basin of about 7 acres, 6 
feet deep adjacent to upper portion East Norwalk 
channel. All depths refer to mean low water. Mean and 
spring tidal ranges at South Norwalk are 7.1 and 8.4, 
respectively. (See Table 1-B at end of chapter for Acts 
authorizing existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are two city wharves, neither 
of which is in usable condition. There are 19 private 
wharves in use or in usable condition, having a total 
berthing space of about 3,100 feet. One has rail 
connections. Private wharves are not open to general 
use. Public wharves are inadequate for existing 
commerce. (See Port Series No. 4 for Southern Parts of 
New England (1952).) 
Operations and results during fiscal year. Maintenance: 
Dredging in the 12, 10 and 6-foot channels, 10 and 6 
foot anchorages and 10-foot basin, by contract, was 
commenced in September and completed in November 
1969. About 63,223 cubic yards of ordinary material 
were removed. 
Condition at end of fiscal year. Existing project was 
completed in 1950. Controlling depths at mean low 
water are 12 feet in 12-foot channel (1969); 7.1 feet in 
left outside quarter and middle half and 10.7 feet in 
12

NEW ENGLAND DIVISION 
right outside quarter of 10-foot channel from highway 
bridge to 500 feet north of bridge (1962); thence 6 feet 
in 10-foot channel to Norwalk (1960); plus 1.5 feet in 6- 
foot basin at Norwalk (1960); 9.5 feet in 10-foot 
anchorage basin opposite Fitch Point (1966); 5.3 feet in 
6-foot channel from 10-foot anchorage to East Norwalk 
(1966); and 5.4 feet in 6-foot irregular-shaped 
anchorage basin adjacent to upper portion of East 
Norwalk channel (1964). Federal costs for existing 
project from regular funds were $368,612 for new work, 
and $990,861 for maintenance. In addition, $34,500 
expended for new work from contributed funds. 
20. PLYMOUTH HARBOR, MASS. 
Location. Harbor is 45 miles by water south of Boston. 
Its outer anchorage, the "Cow Yard," is common to 
Plymouth, Duxbury, and Kingston. (See Coast 
Geodetic Survey Chart 245.) 
Previous projects. For details, see Annual Reports for 
1915 and 1938. 
Existing project. Provides for; (a) Protecting by riprap 
sections of Long Beach damaged by storm of November 
1898, and restoring Eel River to its former course; (b) 
dredging a channel 18 feet deep at mean low water and 
200 feet wide, increased at entrance and on curves, 
from the bay to town wharves, formerly in areas south 
of State pier, a distance of about 2.5 miles, with a 
suitable turning basin at inner end; (c) dredging a 
channel 150 feet wide, 15 feet deep at mean low water, 
extending northwesterly about 0.3 mile from a point off 
site of northerly Craigs wharf (now State pier) with a 
turning basin 300 feet square, and of same depth, at its 
northwesterly end; (d) maintenance of area dredged to 
18 feet deep below mean low water by the 
Commonwealth of Massachusetts, connecting 15-foot 
channel with 18-foot channel in vicinity of State pier; 
(e) a rubblestone breakwater extending 1,400 feet 
easterly from a point north of Town wharf, and thence 
southeasterly for 2,100 feet; an anchorage 8 feet deep 
and 60 acres in area inside breakwater; and 
elimination of authorized 18-foot anchorage from 
existing project; (f) recreational development, to 
provide for sport fishing from breakwater, consisting of 
stone causeway about 360 feet long from westerly end 
of breakwater to land, guard rail along top of 
breakwater and causeway, footbridge spanning a 
navigation opening through breakwater, and public 
access, parking and sanitary facilities for sport 
fishermen use. Mean range of tide is 9.6 feet; extreme 
range is 13.7 feet. Total estimated project cost is $2,195, 
000, of which $439,000 is non-Federal cost. Major 
rehabilitation of Long Beach dike will be required. 
Total estimated Federal cost of this work is $1,070,000 
(1970). (See Table 1-B at end of chapter for Acts 
authorizing existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are three wharves of pile and 
timber construction; one is owned by the State, one by 
451-584 0-72-2 
the town, and the third by Plymouth Yacht Club. State 
and town wharves are open to public use. In addition, 
there are six boatyards with marine railway facilities 
along waterfront, equipped for boat building and 
repairs. Local interests will maintain existing public 
landings open to all on equal terms, and provide all 
necessary mooring facilities in anchorage. 
Operations and results during fiscal year. New work: 
Construction of rubblestone breakwater, by contract, 
was continued, and work had progressed to 83 percent 
completion on June 30, 1970. A total of 179,160 tons of 
stone have been placed. 
Major rehabilitation; Engineering studies by hired 
labor for rehabilitiation of Long Beach Dike were 
completed. Contract was awarded 17 May 1970. 
Condition at end of fiscalyear. All work authorized prior 
to 1962 is complete. Construction of anchorage 8 feet 
deep and 60 acres in area inside breakwater was 
completed in 1967. To complete project there remains 
completion of construction of the rubblestone 
breakwater. Contract for rehabilitation of Long Beach 
Dike has been awarded. Controlling depths at mean 
low water were; in 18-foot channel, "Bell-l" to 1 mile 
upstream, 10 feet in left outside quarter, 12.9 and 11.2 
feet in middle half and right outside quarter, 
respectively (1967); thence 16 feet in left outside 
quarter, 15.5 feet in middle half, and 15.1 feet in right 
outside quarter to 200 feet upstream of Buoy "BC-15" 
(1967); thence 14 feet to State Pier (1964), 15 feet in 
15-foot channel and turning basin to town wharf 
(1964). Federal costs for existing project from regular 
funds were $1,682,479 new work, $700,443 
maintenance, and $49,717 rehabilitation. In addition, 
$481,056 new work and $400 maintenance contributed 
funds expended. 
21. PORTLAND HARBOR, MAINE 
Location. On southwestern coast of Maine about 100 
miles northeast of Boston, Mass. (See Coast and 
Geodetic Survey Chart 325.) 
Previous projects. For details see Annual Reports for 
1915 and 1936. 
Existing project. An entrance channel 1,000 feet wide 
and 45 feet deep from deep water in Casco Bay to a line 
about opposite Fort Gorges, and a maneuvering basin 
and anchorage 45 feet deep in existing House Island 
anchorage area; a channel 35 feet deep over varying 
widths from Fort Gorges to Boston & Maine Railroad 
bridge; a turning basin 35 feet deep near upper end of 
channel; an anchorage 30 feet deep opposite the 
eastern end of the city and a channel 30 feet deep into 
Back Cove; for rock excavation to 14 feet deep between 
Grand Trunk and Tukey's Bridges, and a channel 12 
feet deep and 300 feet wide to a point about 2,500 feet 
upstream from Tukey Bridge; a breakwater 900 feet 
long at Spring Point, and one 2,000 feet long south of 
the inner harbor entrance; and maintenance of Soldier 
Ledge Channel in Hussey Sound at a depth of40 feet. 
3

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Project depths refer to mean low water. Mean tidal 
range is 8.9 feet, and extreme range is 10.2 feet, 
although variations as great as 16 feet have been 
observed under storm conditions. (See Table 1-B at end 
of chapter for Acts authorizing existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 51 waterfront facilities, of 
which 3 are not used. Five wharves are publicly owned, 
3 by the U.S. Government, 1 by State of Maine, and 1 
by city of South Portland. Mechanical-handling 
facilities are available at 15 wharves. Railroad 
connections have been made to 29 of them. Facilities 
are adequate for existing commerce. (For further 
details see page'13, H. Doc. 216, 87th Cong., and Port 
Series 1 for Ports of Searsport Harbor and Portland, 
Maine, and Portsmouth, N.H. (revised 1952).) 
Operations and results during fiscal year. Maintenance: 
Engineering studies, by hired labor, were completed for 
dredging the 35-foot Fore River channel. Contract was 
awarded. Costs were $25,871. Project Condition 
Survey made of 45-foot Main Ship channel at a cost of 
$6,651. 
Condition at end of fiscal year. Existing project was 
completed in August 1966, except for ledge 
encountered in House Island anchorage. Removal of 
ledge completed in June 1968. Controlling depths at 
mean low water were; 45 feet in 45-foot Main Ship 
channel (Jan. 1970); 45 feet 45-foot House Island 
anchorage (1968); 32 feet except shoaling to 28 feet 
along channel limit in left outside quarter, 33 feet in 
middle half, and 32.5 feet except shoaling to 27 feet 
along channel limit in 35-foot channel from limit of 45- 
foot channel to Portland Bridge; 32 feet in Fore River 
(Sept. 1969); 35 feet in turning basin near head of 
channel 30 feet in southerly half and 26 feet in 
northerly half of 30-foot anchorage off east end of city 
of Portland (1967); 18 feet in 30-foot approach channel 
to Back Cove (1945); 13 feet in 14-foot channel 
between Grand Trunk and Tukey Bridges (1945); 8 
feet in 12-foot Back Cove Channel (1945). Federal costs 
for existing project from regular funds were $8,896,275 
for new work, and $1,591,208 for maintenance. 
22. PORTSMOUTH HARBOR AND 
PISCATAQUA RIVER, MAINE AND 
N.H. 
Location. Piscataqua River forms a portion of 
boundary between Maine and New Hampshire. 
Mouth of this river is called Portsmouth Harbor. It is 
45 miles northeast of Boston Harbor, Mass., and 37 
miles southwest of Portland Harbor, Maine. (See Coast 
and Geodetic Survey Charts 229 and 329). 
Previous project. For details see Annual Report for 
1892. 
Existing project. Removal of ledge rock areas in 
vicinity of Gangway Rock, southwest point of Badgers 
Island and Boiling Rock to 35 feet deep; widening 35- 
foot channel at bends by removal of ledge rock areas in 
vicinity of Henderson Point, Gangway Rock, Badgers 
Island, Maine-New Hampshire Interstate Bridge and 
Boiling Rock; and extending channel from above 
Boiling Rock to a point about 1,700 feet above Atlantic 
Terminal Sales dock in Newington generally 400 feet 
wide, and 35 feet deep below mean low water with 
maneuvering basins above Boiling Rock and at head of 
project; channel 6 feet deep, 100 feet wide from Little 
Harbor through Rye-New Castle drawbridge, then 
northerly between mainland and Leach's Island to 
deep water in vicinity of Shapleigh and Goat Islands, 
channel 75 feet wide, 6 feet deep up Sagamore Creek to 
public landing on downstream side of Sagamore 
Avenue bridge and anchorage strip, 6 feet deep, 75 feet 
wide, totalling 3 acres, adjacent to channel in 
Sagamore Creek. Federal cost of completed work 
authorized prior to 1965 is $5,080,440. Latest approved 
estimate of this work is $272,400, of which $100,000 is 
non-Federal contribution. (See Table 1-B at end of 
chapter for Acts authorizing existing project.) 
Local cooperation. Cash contribution of $92,500 has 
been received. The Commissioner of Public Works, on 
behalf of the State of New Hampshire, has agreed to 
accept a minimal project, and has furnished letters of 
concurrence from the City of Portsmouth and the New 
Hampshire Port Authority. 
Terminal facilities. Waterfront terminals are chiefly on 
south bank of Piscataqua River in Portsmouth and 
Newington. U.S. Navy Yard is on opposite bank at 
Kittery, Maine. Eighteen piers, wharves, and landings 
represent available terminals for handling the port's 
waterborne commerce. Navy Yard is not used for 
commercial activities. On Maine side of river are a 
town landing and two docks. On New Hampshire side 
there are 13 terminals, 6 of which include a public 
landing, 2 docks, 3 facilities used for vessel mooring and 
landings, are at Portsmouth. In addition there are a 
number of private recreational boat docks. Terminal 
facilities are considered adequate for existing 
commerce. (See Port Series 1 for Ports of Searsport and 
Portland, Maine, and Portsmouth, N.H.) 
Operations and results during fiscal year. New work: 
Engineering studies, by hired labor, for construction of 
6-foot channels and anchorage were completed. 
Contract was awarded in June 1970. Maintenance: 
Shoal removal, by contract, in the 35-foot channel was 
commenced in January 1970 and completed in 
February 1970. About 23,447 cubic yards of ordinary 
material were removed. 
Condition at end of fiscal year. All work authorized prior 
to 1965 has been completed. Removal of ledge rock 
areas in the 35-foot channel were completed in 1891. 
Widening and extending the 35-foot channel, except 
for removal of sand shoal 400 feet upstream of 
Interstate Bridge, and removal of railroad engine from 
the harbor were completed in 1966. Shoal removal was 
completed in 1969 in the 35-foot channel. Construction 
of 6-foot channel and anchorage is required to 
14

NEW ENGLAND DIVISION 
complete the project. Engineering studies for this work 
are complete. Scope of project has been reduced due to 
high construction costs, evidenced by bids received. 
Controlling depths at mean low water were; 35 feet in 
35-foot channel (1969); 1.0 foot in 6-foot anchorage, 
4.5 feet in 6-foot channel except 2.0 feet opposite 
Clampit Island and 1.0 foot in northern branch about 
9,600 feet upstream of Clampit Island (1966). Federal 
costs for existing project from regular funds were $5, 
106,164 for new work and $149,601 for maintenance. 
23. PROVIDENCE RIVER AND HARBOR, 
R.I. 
Location. Formed at city of Providence by junction of 
Seekonk River and two small streams which rise in 
northern Rhode Island. It is tidal and flows southerly 
in a deep channel between broad flats about 8 miles, 
emptying into Narragansett Bay. (See Coast and 
Geodetic Survey Chart 278.) 
Previous projects. For details see Annual Report for 
1915, 1936, and 1938. 
Existing project. Channel 40 feet deep, generally 600 
feet wide from deep water in Narragansett Bay just 
south of Prudence Island Light to turn below Field 
Point at Providence, thence up to 1,700 feet wide to 
existing project limit at Fox Point, with easing of bends 
to minimum radius of 5,00.0 feet, excluding marginal 
strip 75 feet wide channelward of established harbor 
lines; channel 30 feet deep and 150 feet wide, 
extending northeastward from upper end of existing 
project to vicinity of India Point at mouth of Seekonk 
River. Mean tidal range is about 4.6 feet and 
maximum range, due to combined effect of wind and 
other causes is 8 feet or more. Latest Approved estimate 
of project cost is $19,400,000. India Pt. Channel 
portion of project is considered inactive and excluded 
from foregoing estimate. Estimated Federal cost of this 
portion is $300,000 (1968). (See Table 1-B at end of 
chapter for Acts authorizing existing project.) 
Local cooperation. Assurances have been received. 
Terminal facilities. There are 27 water terminal 
facilities serving port of Providence. Three-fourths of 
all facilities have railway connections. Four facilities 
are owned by city of Providence and two by State of 
Rhode Island. Facilities are adequate for existing 
commerce. (For details see Port and Terminal 
Facilities of Southern New England No. 4, revised in 
1952.) 
Operations and results during fiscal year. New work: 
Construction, by contract, in 40-foot main channel was 
continued. About 2,193,000 cubic yards of ordinary 
material were removed this fiscal year, making a total 
of 7,053,000 cubic yards removed from the 40-foot 
channel, and about 873 cubic yards of boulders. 
Maintenance: Removal of shoals to 35 feet in various 
parts of harbor was in progress. About 225,000 cubic 
yards of ordinary material were removed. 
Condition at end of fiscal year. Existing project is 67 
percent complete. Channel 35 feet deep, 600 feet wide 
was completed in 1949, and has now been authorized 
for deepening to 40 feet. To complete the project there 
remains construction of 40 and 30-foot channels. 
Construction of 40-foot channel is in progress. The 30- 
foot channel is to be declared inactive. Head of 
commercial navigation is at Fox Point. Controlling 
depths at mean low water were 35.2 feet in 35-foot 
channel to Rumstick Neck Reach except for shoaling 
to 32.5 feet on east limit at bend (1963); then 34.7 feet 
in middle half of channel and 32.7 feet in left outside 
quarter and 32.3 feet in right outside quarter of 
channel to Bullock Point Reach; then 34.2 feet in 
middle half of Bullock Point Reach and 25 feet in left 
outside quarter (1963); 10.5 feet in right outside 
quarter of 600-foot wide channel (1963); then 35 feet 
from Sabin Point to head of harbor at Fox Point (1960). 
Federal costs for existing project from regular funds 
were $14,587,315 for new work, and $2,192,741 for 
maintenance. 
24. PROVINCETOWN HARBOR, MASS. 
Location. In the bight at northern extremity of Cape 
Cod, 40 miles southeast of Gloucester, 24 miles 
northeast of Cape Cod Canal and about 40 miles 
southeast of entrance to Boston Harbor. (See Coast and 
Geodetic Survey Charts 580 and 1208.) 
Previous project. For details see Annual ReportS for 
1915 and 1931. 
Existing project. Preservation of point of land forming 
the harbor, a rubblestone protection dike 5 feet wide at 
top and 15 feet above mean low water, 6,150 feet across 
House Point Island Flats from Steven's Point to Wood 
End, and a stone breakwater to elevation 15.5 feet 
above mean low water with a top width of 10 feet 
commencing at a point about opposite MacMillan 
(Town) wharf, approximately 835 feet from shore and 
extending 2,500 feet northeasterly. Mean range of tide 
is 9.1 feet and spring range is 10.6 feet. Total estimated 
project cost is $4,800,000 of which non-Federal costs 
are $760,000. The 300-foot extension of Long Point 
beach protection and bringing it up to grade where 
necessary portion is considered inactive and excluded 
from foregoing cost estimate. Estimated cost (1954) of 
this portion is $45,000. (See Table 1-B at end of chapter 
for Acts authorizing existing project.) 
Local cooperation. Local interests must contribute in 
cash 50 percent of total cost of construction of 
breakwater but not to exceed $760,000, and agree to 
hold the United States free from damages. Assurances 
have been received. State and Town are providing 
funds as required. 
Terminal facilities. Developed waterfront of 
Provincetown is approximately 1.5 miles in extent and 
mostly privately owned. There are seven piers in this 
area which handle entire commerce of harbor. None of 
15

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
the piers has railroad connections. Facilities are 
adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Engineering studies by hired labor, for construction of 
breakwater were completed. Contract was awarded in 
June 1970. Maintenance: Engineering studies, by 
hired labor, for repairs to rubblestone dike were 
completed. Contract was awarded in June 1970. 
Condition at end of fiscal year. Planning has been 
completed and contract awarded. To complete project 
there remains construction of stone breakwater 2,500 
feet long and 300-foot extension of Long Point beach 
protection. Federal costs for existing project from 
regular funds were $206,269 for new work, and $162, 
347 for maintenance. 
25. RED BROOK HARBOR, BOURNE, 
MASSACHUSETTS 
Location. Barlows Landing and Hen Cove are located 
in town of Bourne on east side of Buzzards Bay, 5 miles 
south of western entrance to Cape Cod Canal. (See 
Coast and Geodetic Survey Charts Nos. 249, 251 and 
1208). 
Existing project. Entrance channel, 6 feet deep, 100 
feet wide, leading from deep water in Pocasset Harbor 
into a 14.5-acre anchorage in Hen Cove 6 feet deep and 
into a 10-acre anchorage 6 feet deep at Barlows 
Landing. Mean range of tide is 4.0 feet and spring 
range is 5.0 feet. Total estimated cost (1970) is $252,800 
of which $115,000 is non-Federal cost. (See Table 1-B 
at end of chapter for Act authorizing existing project.) 
Local cooperation. Local interests are required to make 
a cash contribution of 50 percent of project 
construction cost, estimated at $115,000; provide, 
maintain and operate two public landings, parking 
areas and other public use facilities open to all on equal 
terms; hold United States free from damages; provide 
without cost lands, easements and rights-of-way; 
establish a public body empowered to cooperate 
financially, and to provide and operate essential local 
facilities open to all on equal terms; establish 
regulations prohibiting discharge of untreated 
pollutants in the waters of the harbor. Compliance by 
local interest with requirements of local cooperationthey 
have advised that local funds cannot be furnished 
prior to March 1971. Scheduling of advertisement for 
bids dependent upon funds. 
Terminal facilities. There are two boatyards in Red 
Brook Harbor with mooring and berthing facilities for 
140 boats; and three public landings with adjacent 
launching ramps located at Barlows Landing, Hen 
Cove and Red Brook Harbor, respectively. 
Operations and results during fiscal year. New work: 
Planning, by hired labor, was essentially completed. 
Condition at end of fiscal year. Construction of existing 
project has not been started. 
26. ROCKPORT HARBOR, MASS. 
Location. Eastern side of Cape Ann on the shores of 
Sandy Bay and about 37 Miles northeast of Boston. 
Existing project. Rebuilding to the height of 18.5 feet 
with rubblestone the two breakwaters at entrance, built 
under the original project, and removing the principal 
rocks in the harbor. (See Table 1-B at end of chapter 
for Act authorizing existing project.) 
Local cooperation. None required. 
Terminal facilities. There are four commercial 
wharves, one of granite, the others of timber 
construction. There is one yacht club with a public 
landing. Facilities are adequate for present commerce. 
Operations and results during fiscal year. Maintenance: 
Repairs to outer portion of Bearskin Neck Breakwater, 
by contract, were commenced and completed in March 
1970. 
Condition at end of fiscal year. The existing project was 
completed in 1905. 
27. ROYAL RIVER, MAINE 
Location. Situated 11 miles north of Portland, Maine, 
in Yarmouth Village. Royal is a small coastal stream 
which empties into Casco Bay. (See Coast and 
Geodetic Survey Chart 315.) 
Existing project. Provides for enlargement of channel 
through bar at Gravel Point, 100 feet wide, 4.5 feet up 
to head of commercial navigation at Yarmouth, and 
removal of several ledges near village of Yarmouth; 
construction of 195-foot rubblestone jetty opposite 
Wolfe's Point, and dredging channel 4.5 feet through 
obstructed channel; channel 8 feet deep, 80 feet wide 
from State channel in Casco Bay to commercial wharf 
at Yarmouth and anchorage of 8 acres, 6 feet deep 
downstream of Interstate 95 Highway Bridge. Mean 
range of tide is 9.0 feet and spring range is 10.4 feet. All 
depths refer to mean low water. (See Table 1-B at end 
of chapter for Acts authorizing existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. Area is well connected with other 
sections of state. Interstate Route 95 passes over Royal 
River and connects with U.S. Route 1 just north of 
Yarmouth. Town has constructed public landing and 
launching ramp immediately below bridge on north 
bank. There are two boatyards equipped with floats, 
marine railways and launching ramps. 
Operations and results during fiscalyear. New work: Fund 
adjustment was made based on final survey for work 
completed in fiscal year 1969. Maintenance: Fund 
adjustment was made based on final survey for work 
completed in fiscal year 1969. 
Condition at end of fiscal year. Project was completed in 
June 1969. Controlling depths at mean low water were 
8 feet in 8-foot channel (1969), and 6 feet in 6-foot 
anchorage (1969). 
16

NEW ENGLAND DIVISION 
28. SACO RIVER, MAINE 
Location. Rises in White Mountain region of New 
Hampshire at an elevation about 1,900 feet above sea 
level, flows about 105 miles in a general southeasterly 
direction, and discharges into Atlantic Ocean about 16 
miles southwest of Portland, Maine. (See Coast and 
Geodetic Survey Chart 231). 
Existing project. Channel 8 feet deep, mean low water, 
in earth cuts and 9 feet deep in ledge from the sea to 
head of navigation at cities of Saco and Biddeford, 
distance of about 6 miles, 140-foot width across the bar, 
200 feet in lower section between jetties, 140 feet in 
middle section and 100 feet in upper section, secured 
by; dredging, rock excavation, several small jetties 
within the river, a riprap breakwater 6,600 feet long, 
extending seaward from north side of mouth of river, 
and riprap jetty or training wall from south side of 
mouth of river, about parallel with breakwater, about 
4,800 feet long. Federal cost of this completed new work 
was $531,716 and $20,000 non-Federal. Portion of 
project for removal of small quantity of ledge at Twin 
Island is considered inactive and is excluded from 
foregoing costs. Cost of this portion (1954) estimated to 
be $30,000. Later project provides for 2 anchorages 6 
feet deep at mean low water totalling 10.5 acres at 
mouth of river and a 10-acre, 6 feet deep maneuvering 
basin at head of navigation. Estimated cost for 
anchorages and maneuvering basin is $200,000, of 
which non-Federal cost is $62,000. Mean tidal range is 
8.8 feet; extreme about 9.8 feet. (See Table 1-B at end 
of chapter for Acts authorizing existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are five wharves of solid-fill 
construction at Saco and Biddeford, none of which has 
railroad connection; and a small pier near mouth of 
river used for summer passenger business. 
Operations and results during fiscal year. New work: Work 
by joint contract, for construction of 6-foot anchorages 
and maneuvering basin was commenced in July 1969, 
and completed on October 2, 1969. Removed about 73, 
130 cubic yards of ordinary material. Maintenance: 
Work by joint contract, to restore the 8-foot channel to 
project depth was commenced in July 1969 and 
completed on October 2, 1969. Removed about 87,354 
cubic yards of ordinary material and placed 810 tons of 
stone. Costs were $204,520. Removal of unclassified 
material to depth of 10 feet below mean low water in 
channel was commenced in March and completed in 
April 1970. Costs were $17,850. 
Condition at end of fiscal year. Project was completed in 
October 1969, with the construction of the 6-foot 
anchorages and maneuvering basin. Controlling 
depths at mean how water were; 8 feet in 8-foot channel 
through bar (1969); thence 7 feet to abreast of Caw 
Island (1968); thence 6 feet to upstream end of project 
(1969); 6 feet in anchorages and maneuvering basin 
(1969). Total Federal costs for existing project were 
$663,739 for new work and $728,348 for maintenance. 
In addition, $78,474 in contributed funds have been 
expended. 
29. SCARBORO RIVER, MAINE (BETWEEN 
PROUTS NECK AND PINE POINT) 
Location. A small and generally shallow stream about 
2.5 miles long which rises in town of Scarboro, Maine, 
and empties into north end of Saco Bay, immediately 
west of Prouts Neck. It is 17 miles by water southeast of 
Portland, Maine. (See Coast and Geodetic Survey 
Charts 231 and 1205.) 
Existing project. A channel across the bar 200 feet wide 
and 8 feet deep at mean low water, and a channel 2,400 
feet long, 100 feet wide and 6 feet deep at mean low 
water, leading to an anchorage of the same depth 1,350 
feet long and 300 feet wide, and a jetty 800 feet long at 
tip of Pine Point. Mean range of tide is 8.8 feet and 
spring range is 10.1 feet. Latest published map is in 
project document (H. Doc. 69, 81st Cong., 1st sess.). 
(See Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. There is one wharf of pile and 
timber construction on Scarboro River, extending 
northerly from Pine Point almost to southerly limit of 
anchorage. Facility is owned by town of Scarboro and 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Work, by contract, was commenced on July 3, 1969, for 
dredging in the 6-foot channel and anchorage and was 
completed on August 28, 1969. About 47,000 cubic 
yards of ordinary material were removed. 
Condition at end of fiscal year. Existing project was 
completed in May 1962. Dredging entrance channel 
and inner harbor basin was completed in October 
1956. Channel across bar later shoaled and shifted 
until controlling depth in best channel was plus 0.1 
foot. Because of excessive shoaling rate, project design 
was modified under authority delegated to Chief of 
Engineers to include construction of a jetty at harbor 
entrance. Construction of jetty was commenced July 
1961 and completed May 1962. Controlling depths at 
mean low water were 6 feet in 8-foot entrance channel 
(1969); 6 feet in 6-foot channel (1969) and 6 feet in 6- 
foot anchorage (1969). 
30. STAMFORD HARBOR, CONN. 
Location. On north shore of Long Island Sound, 32 
miles east of New York City. (See Coast and Geodetic 
Survey Chart 221.) 
Previous projects. For details, see Annual Report for 
1915 and 1948. 
Existing project. Provides for two detached 
breakwaters; one 1,200 feet long on easterly side, and 
one 2,900 feet long on westerly side of channel at 
entrance to harbor; an entrance channel 18 feet deep, 
200 feet wide to upper end of 18-foot anchorage, about 
17

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
0.55 mile, and thence 15 feet deep to junction of 
branches, about 0.5 mile; a channel in West Branch 15 
feet deep, 125 feet wide, and about three-fourths of a 
mile long, and a basin of same depth at head of branch 
of such widths as to exclude extensive, rock excavation 
along northeast side; a channel in East Branch 12 feet 
deep and 100 feet wide, with increased width at turns, 
to a point 1,100 feet from head of navigation, thence of 
same depth and from 85 to 125 feet wide to head of 
navigation, a total distance of about 1.5 miles; and 
anchorage basin 18 feet deep on west side of 18-foot 
entrance channel, 600 feet wide, and 1,000 to 1,900 feet 
long, and an anchorage basin 8 feet deep adjacent to 
East Branch Channel, about 4.2 acres. Plane of 
reference is mean low water, mean tidal range is about 
7.2 feet. Extreme tidal range, due to combined effects of 
wind and other causes, is 12 feet or more. Federal cost 
of new work for completed project was $757,681, and 
$169,636 non-Federal. Dredging of a slight widening in 
East Branch Channel opposite Ludlow Street and 
dredging of 8-foot anchorage adjacent to East Branch 
Channel is considered inactive. Estimated cost of this 
work was $125,000 (1954). (See Table 1-B at end of 
chapter for Acts authorizing existing project.) 
Local cooperation. Fully complied with for completed 
work. Total actual costs of local cooperation amounted 
to cash contribution of $109,636. 
Terminal facilities. There are 21 privately owned 
wharves and piers and one city wharf in use adjacent to 
channels in East and West Branches. Total available 
berthage is about 4,500 feet. None of the wharves is 
open to general public use, except city wharf. Two have 
direct rail connections. Facilities are adequate for 
existing commerce, but additional pleasure-craft 
facilities are needed. (For details, see Port and 
Terminal Facilities of Southern New England, revised 
1952). 
Operations and results during fiscal year. Regular funds, 
maintenance: Engineering studies, by hired labor, for 
dredging 12-foot east branch channel were in progress. 
Work has been deferred until fiscal year 1972. 
Condition at end of fiscal year. Project is complete. 
Controlling depths at mean low water in various 
channels are 15.5 feet in 18-foot channel from deep 
water in Long Island Sound to north end of 18-foot 
anchorage (1967); 15 feet in 15-foot channel in West 
Branch (1969) and 13 feet in 15-foot West Branch 
Basin (1967); 6.6 feet in middle half of 12-foot East 
Branch channel (1968); 15 feet in 18-foot anchorage 
basin on west side of 18-foot entrance channel (1968); 
and plus 6 to 0 feet in 8-foot deep anchorage basin 
adjacent to East Branch channel (1949). Federal costs 
for existing project from regular funds were $757,681 
for new work, and $382,596 for maintenance. In 
addition, $169,636 expended for new work from 
contributed funds. 
31. STONY CREEK, BRANFORD, CONN. 
Location. On north shore of Long Island Sound, about 
8 miles east of New Haven, near eastern boundary of 
Town of Branford, Conn. (See Coast and Geodetic 
Survey Charts Nos. 217 and 1212.) 
Existing project. Entrance channel 6 feet below mean 
low water, 100 feet wide from deep water in Long 
Island Sound to a point 800 feet north of public wharf 
at Stony Creek and maneuvering basin 6 feet below 
mean low water totaling 3.5 acres adjacent to channel 
north of wharf. Mean range of tide is 5.6 feet; spring 
range is 6.6 feet. Latest approved estimate is $195,000, 
and includes a cash contribution of $92,000. (See Table 
1-B at end of chapter for Act authorizing existing 
project.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are two marinas and a 
boatyard in harbor with total storage area for 125 
boats, a public dock at Stony Creek equipped with two 
landing floats, and two landings which are privately 
operated. 
Operations and results during fiscal year. New work: 
Operations, by contract, were commenced on 
September 15, 1969 for dredging of the 6-foot entrance 
channel and maneuvering basin. About 76,000 cubic 
yards of ordinary material were removed, and the work 
was completed in January 1970. 
Condition at end of fiscal year. Project was completed in 
January 1970. Controlling depths at mean low water 
were; 6 feet in the 6-foot channel and maneuvering 
basin (1970). 
32. WELLFLEET HARBOR, MASS. 
Location. On Cape Cod Bay, near southern end of the 
hook of Cape Cod, 12 miles southeast of Provincetown 
Harbor and 25 miles northeast of entrance to the Cape 
Cod Canal. (See Coast and Geodetic Survey Charts 
581 and 1208.) 
Previous project. For details see Annual Report for 
1895. 
Existing project. A channel 10 feet deep and 125 feet 
wide from "Deep Hole" to town landing, and an 
anchorage basin of the same depth 800 feet by 500 feet. 
The project depths refer to mean low water. The mean 
range of tide is 10 feet and the spring range is 11.6 feet. 
Federal cost of new work for completed project was 
$146,284, and $32,000 non-Federal. The latest 
published map is contained in H. Doc. 557, 76th Cong., 
3d sess. (See Table 1-B at end of chapter for Acts 
authorizing existing project.) 
Local cooperation. Fully complied with. Total actual 
costs for all requirements of local cooperation under 
terms of the project authorization amount to $458,000, 
consisting of; $32,000 cash contribution, $166,000 for 
construction of a public wharf, and $260,000 for 
dredging in the project area. The Commonwealth of 
18

NEW ENGLAND DIVISION 
Massachusetts dredged a channel and anchorage basin 
6 feet deep in 1916, at a cost of $17,363. 
Terminal facilities. There are seven wharves in the 
harbor, only one of which is open to the public. The 
existing facilities are considered adequate for the 
existing commerce. 
Operations and results during fiscal year. Maintenance: 
Costs were incurred for engineering studies, by hired 
labor, for dredging the 10-foot harbor anchorage. The 
work has been completed. 
Condition at end of fiscal year. The channel was dredged 
to a depth of 4 feet in 1889. The Commonwealth of 
Massachusetts dredged the 6-foot channel in 1916. The 
existing project was completed in June 1958, with the 
construction of the 10-foot channel and anchorage 
basin. The controlling depths at mean low water were 
as follows; In the 10-foot channel entering from 
seaward in the left outside quarter 7.7 feet, mid half of 
channel 9.8 feet; right outside quarter 8.3 feet; 5.3 to 
10.7 feet in the anchorage basin (1965). Federal costs 
for existing project from regular funds were $146,284 
for new work, and $6,712 for maintenance. In addition, 
$32,000 expended from new work for contributed 
funds. 
33. WELLS HARBOR, MAINE 
Location. In town of Wells at mouth of Webhannet 
River about 20 miles northeast of Portsmouth Harbor 
and about 34 miles southwest of Portland Harbor. (See 
Coast and Geodetic Survey Chart 1205.) 
Existing project. Repairs to an old Government pier 
about 750 feet long, made of cribwork ballasted with 
stone extending seaward from Drakes Island; an 
anchorage basin 7.4 acres in area and 6 feet deep; a 
channel 100 to 150 feet wide, extending from deep 
water in the Atlantic Ocean to inner end of basin, with 
seaward section 8 feet deep, and harbor section 6 feet 
deep; and two converging stone jetties, one extending 
940 feet easterly from Wells Beach and the other 840 
feet southerly from Drakes Island, separated so as to 
provide a clear opening 400 feet wide, and for 
revetment of seaward face of tip of Wells Beach. Project 
depths refer to mean low water. Mean range of tide is 
8.7 feet and spring range is 9.9 feet. Highest tide is 
estimated as 13.5 feet above and lowest tide as 3.5 feet 
below plane of mean low water. Federal cost of new 
work for completed project was $360,973. House Doc. 
202, 86th Cong., 2d sess., contains latest published 
map. Extension of the Wells Beach jetty to a total 
length of 2,240 feet and extension of Drakes Island jetty 
to a total length of 3,065 feet, and dredging a 300- by 
450-foot settling basin south of the anchorage, was 
authorized by the Chief of Engineers on September 20, 
1965. (See Table 1-B at end of chapter for Acts 
authorizing existing project.) 
Local cooperation. Fully complied with. Total costs to 
date for cash contribution were $212,000 and local 
interests appropriated about $150,000 for construction 
of a public landing and auxiliary harbor facilities. 
Construction of these facilities has not been started. 
Terminal facilities. None in Wells Harbor or any 
portion of Webhannet River. Full utilization of Wells 
Harbor will require provision and maintenance of 
moorings and a public landing with suitable supply 
facilities and utilities. 
Operations and results during fiscal year. Regular funds, 
maintenance: Engineering studies, by hired labor, for 
dredging the 8-foot entrance channel were completed. 
Contract was awarded. Work was commenced on June 
2, 1970 and was in progress on June 30, 1970. About 
27,000 cubic yards of ordinary material have been 
removed. 
Condition at end of fiscal year. Project completed in April 
1967. Construction of public landing and harbor 
facilities, required by local interests, remain to be 
completed. Controlling depths at mean low water were 
5.2 feet in 8-foot entrance channel (1969); 3.1 feet in 6- 
foot channel; and 3.7 feet in 6-foot anchorage (1969). 
34. WESTPORT HARBOR AND 
SAUGATUCK RIVER, CONN. 
Location. On north shore of Long Island Sound about 
11 miles west of Bridgeport Harbor. (See Coast and 
Geodetic Survey Charts 221 and 1212). 
Previous project. For details see Annual Reports for 
1915 and 1901. 
Existing project. Channel 9 feet deep, 125 feet wide 
across outer bar, and generally 100 feet wide to 
highway bridge at Saugatuck, thence 4 feet deep, 60 
feet wide up to Westport; a turning and anchorage 
basin 6 feet deep, about 3.5 acres in area downstream of 
highway bridge at Saugatuck; a riprap breakwater 
about 540 feet long at Cedar Point; removing ledge 
opposite Stony Point and boulders from the channel. A 
portion of the 4-foot channel, 60 feet wide at upper end 
of project at Westport; the 9-foot channel, and the 6- 
foot turning and anchorage basin are considered to be 
inactive. (See Table 1-B at end of chapter for Acts 
authorizing existing project.) 
Local cooperation. Fully complied with for completed 
work. Remainder of project was placed in an inactive 
status due to a lack of local cooperation. Recent request 
has been received from local interests for reactivation of 
the 1954 modification. 
Terminal facilities. There is one commercial wharf 
affording about 300 feet of berthing space and several 
piers devoted to the repair of pleasure craft. The town 
of Westport operates one public pier for pleasure craft 
in the basin north of Compo Beach. Facilities are 
considered adequate for present commerce. 
Operations and results during fiscal year. Maintenance: 
Dredging, by contract, of the harbor channel to 4 feet 
was commenced late in November 1969 and suspended 
in January 1970 due to icing conditions. Work was 
resumed in February and completed in April 1970. 
19

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
About 25,874 cubic yards of ordinary material were 
removed. 
Condition at end of fiscal year. Existing project is 
complete except for the inactive portions. Controlling 
depths were; in 9-foot channel, 7.8 feet across basin, 
thence 5.7 feet to Saugatuck (1967); 4 feet in 4-foot 
channel (1970). 
Federal costs for existing project from regular funds 
were $19,308 for new work, and $147,598 for 
maintenance. 
35. WEYMOUTH-FORE AND TOWN 
RIVERS, BOSTON HARBOR, MASS. 
Location. Weymouth-Fore River rises in Braintree, 
Mass., and flows northward 7.5 miles to empty into 
Hingham Bay on south side of Boston Harbor. It is 
tidal for about 6 miles of its length. Town River is a 
small tidal stream about 2 miles long, lying entirely 
within the city limits of Quincy, Mass. It is a tributary 
of Weymouth-Fore River into which it empties about 2 
miles above the mouth. (See Coast and Geodetic 
Survey Chart 246.) 
Previous projects. For details see Annual Reports for; 
1907, 1915, 1932, and 1938. 
Existing project. (For details of completed work under 
separable projects for Weymouth-Fore and Town 
Rivers see Annual Report for 1961, pages 24 and 26.) 
Provides for; combining Weymouth-Fore and Town 
Rivers, Mass., into a single project and modifies for 
construction of channel 35 feet deep, 37 feet in rock, 
and 500 feet wide from deep water in Nantasket Roads, 
and along the southerly half of the Boston Harbor 
"Narrows" channel, through Nantasket Gut, then 35 
feet deep and 400 feet wide to mouth of Weymouth- 
Fore River, then 35 feet deep, generally within limits of 
existing project to Weymouth-Fore River Bridge, then 
35 feet deep and generally 400 feet wide to upper limit 
of existing project; channel 35 feet deep and 300 feet 
wide, increased from 400 to 550 feet at bends, from 
mouth of Town River to existing turning basin in 
Town River; turning and maneuvering basin 35 feet 
deep at confluence of the two rivers in King Cove; 
enlarging and deepening to 35 feet the existing turning 
basin in Town River; 6 acres of 8-foot anchorage to 
compensate for that part of an existing local small-boat 
anchorage that would be usurped by widening 35-foot 
commercial channel; and dimensions of 15-foot 
channel, 100 feet wide, continuing from end of channel 
to point just below Quincy Electric Light & Power Co. 
substation, completed before 1965, remain unchanged. 
Latest approved Federal cost estimate for new work is 
$22,300,000, exclusive of $6,031,853 for new work 
completed before 1962 and amounts expended on 
previous projects. (See Table 1-B at end of chapter for 
Acts authorizing existing project.) 
Local cooperation. Fully complied with for completed 
work, non-Federal contributions were $439,832. 
Assurances for 1965 modification have been received. 
Terminal facilities. There are nine wharves in 
Weymouth-Fore River, all grouped near the head of 
the Federal improvement. Construction consists 
mainly of pile and timber piers extending from timber 
or concrete bulkheads. There are 6,092 feet of berthing 
space available. Six of the wharves have railroad 
connections and mechanical-handling facilities. Three 
of the wharves are used in connection with a large 
shipyard, 2 with oil terminals, I with an electric 
generating plant, 1 with a large soap manufacturing 
plant, and 2 with yacht clubs. On the south bank of 
Town River are 8 wharves, 3 of which are used for boat 
building and repair work, 3 used for receipt of 
petroleum products, 1 for receiving and storing lumber, 
and 1 for receiving scrap materials. On the north bank 
of the river is a yacht building and repair yard. There 
are no publicly owned:; wharves. Facilities are 
considered adequate for the present needs of 
commerce. (For further description of terminal 
facilities, see Port Series No. 3, Port of Boston, revised 
1956.) 
Operations and results during fiscal year. New work: 
Engineering studies, by hired labor, prior to award of 
contract for construction of 35-foot channels, turning 
and maneuvering basin, and anchorage areas were 
completed. Contract was awarded in May 1970. 
Condition at end of fiscal year. Existing project is 68 
percent complete. All work adopted before 1965 is 
complete. Contract has been awarded for construction 
of 35-foot channels, turning and maneuvering basin, 
and anchorage areas. Controlling depths at mean low 
water were; Weymouth-Fore River 30 feet in 30-foot 
channel (1960). Town River-26.3 feet in 27-foot 
channel from junction of Weymouth-Fore River to 
downstream end of Baker's basin (1962), thence 27.0 
feet to end of 27-foot project (1960); 14 feet in 15-foot 
channel (1953); 22.0 feet in 24-foot turning basin 
(1960). Federal costs for existing project from regular 
funds were $6,356,723 for new work, and $426,285 for 
maintenance. Contributed funds of $440,237 were 
expended for new work. 
36. RECONNAISSANCE AND CONDITION 
SURVEYS 
(See Table 1-D at end of chapter.) 
37. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See Table 1-E at end of chapter.) 
38. NAVIGATION ACTIVITIES PURSUANT 
TO SECTION 107, PUBLIC LAW 86-645 
(PREAUTHORIZATION) 
(See Table 1-F at end of chapter.) 
20

NEW ENGLAND DIVISION 
ALTERATION OF BRIDGES 
39. AUTHORIZED BRIDGE ALTERATION 
Location. Chelsea Street Highway Bridge, Mass. 
Construction was completed in October 1961 with a 
Federal cost of $138,518. In addition, non-Federal 
contributed funds amounted to $8,602. For details, see 
page 63 of Annual Report for 1962. 
BEACH EROSION CONTROL 
40. CLIFF WALK, NEWPORT, R.I. 
Location. In Newport, R.I., about 25 miles south of 
Providence, it faces the Atlantic Ocean near mouth of 
Narragansett Bay on south side of Aquidneck Island, 
and extends 3.5 miles southward from west end of 
Newport (Eastons) Beach to and around Lands End 
and thence northward to east end of Bailey Beach. (See 
Coast and Geodetic Survey Coast Charts 236, 353, and 
1210.) 
Existing project Provides for construction of 
improvements for shore protection at Newport, R.I., 
extending 18,000 feet from west end of Newport Beach 
to east end of Bailey Beach; consisting of; Intermittent 
reaches of backfill, dumped riprap, stone mounds, slope 
revetment and breakwaters; concrete toe walls, 
seawalls and parapet walls; grading and surfacing Cliff 
Walk and providing drainage therefor. Mean range of 
tide is 3.5 feet and spring range is 4.4 feet. Latest 
approved estimate of cost is $1,290,000 of which $997, 
000 is non-Federal. Latest published map is in project 
document (H. Doc. 228, 89th Cong., 1st sess.). (See 
Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Local interests must obtain and 
submit for approval suitable easements, leases, or other 
proof of continued right of passage along walk of 
general public, and satisfactory access for construction 
and repair; assure public ownership or control and its 
administration for public use during economic life of 
project; contribute 58.2 percent of estimated first cost 
of construction of all shore structures for protection 
against erosion by waves and currents below upper 
limit of computed wave runup and contribute 100 
percent of estimated first cost of restoration and filling 
of land, repair, construction and drainage of walk, and 
construction of portions of shore structures above limit 
of wave runup, estimated to cost $997,000; maintain 
suitable existing structures for protection of walk; 
assure maintenance and repair of walk; provide 
easements and rights-of-way; and hold United States 
free from damages. Assurances that these conditions 
will be met have been requested. 
Operations and results during fiscal year. New work: 
Planning for construction of the project, by hired labor, 
was continued and completed. 
Condition at end of fiscal year. Planning was completed. 
Bid opening was postponed pending receipt of local 
assurances. 
41. OAK BLUFFS TOWN BEACH, 
MARTHA'S VINEYARD, MASS. 
Location. In town of Oak Bluffs on east shore of island 
of Martha's Vineyard, Massachusetts. 
Existing project. Federal participation to extent of 57.5 
percent of first cost of construction for widening 1,200 
feet of beach by direct placement of sand fill to a width 
ranging from 200 to 150 feet to mean high water along 
its southerly 750 feet decreasing gradually northward 
along remaining 450 feet, and construction of a 530- 
foot long impermeable terminal groin at southern 
extremity of beach. Mean range of tide is 1.7 feet and 
spring range is 2.0 feet. Latest approved cost estimate is 
$404,700 and includes a cash contribution of $170,000. 
(See Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Local interests are required to 
contribute in cash 42.5 percent of project construction 
cost, estimated to be $170,000; assure continued public 
ownership and use of shore and its administration for 
public use during economic life of project, including 
free and direct access to beach from Sea View Avenue, 
and assure Ocean Park Section remains a Park and 
conservation area; assure performance of maintenance 
and repair of project during economic life and serves 
intended purpose; water pollution that would 
endanger health of bathers will not be permitted; and 
hold and save United States free from damages. 
Formal assurances have been requested and received 
from the Commonwealth of Massachusetts. 
Operations and results during fiscal year. Engineering 
studies, by hired labor, and preparation of plans and 
specifications were continued and completed. 
Condition at end of fiscal year. Planning was completed. 
Bid opening was postponed pending receipt of local 
cash contribution. 
42. INSPECTION OF COMPLETED BEACH 
EROSION CONTROL PROJECTS. 
Fiscal year costs for inspection of beach erosion 
control projects were $21,128. Inspections were made 
at the following beaches in July and August 1969; 
Connecticut- Burial Hill, Calf Pasture, Compo, Cove 
Island, Cummings Park, Guilford Point, Gulf, 
Hammonassett, Jennings, Lighthouse Point, Middle, 
Prospect, Sasco Hill, Seaside Park, Sherwood Island 
Park, Short, Silver to Cedar, Southport, Woodmont 
Shore; Massachusetts- North Scituate, Plymouth Town, 
Quincy Shore, Revere, Wessagussett and Winthrop; 
New Hampshire- Hampton and Wallis Sands State 
Beach; Rhode Island- Misquamicut and Sand Hill Cove. 
21

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
43. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECTS 
(See Table 1-G at end of chapter.) 
44. BEACH EROSION CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
Beach erosion control activities pursuant to section 103, 
Public Law 87-874 (preauthorization) 
(See Table 1-H at end of chapter.) 
FLOOD CONTROL 
45. BLACKSTONE RIVER BASIN, MASS 
AND R.I. 
Works covered by this plan consist of a dam and 
reservoir on West River and local protection works at 
three cities on Blackstone River. Flood Control Act of 
1944 authorized plan for a reservoir on West River and 
local protection works at Worcester, Mass., and 
Woonsocket and Pawtucket, R.I., substantially in 
accordance with House Document 624, 78th Congress, 
2d session. Flood Control Act of 1960 authorized a local 
flood protection project at Lower Woonsocket, R.I., 
substantially in accordance with Senate Document 87, 
85th Congress, 2d session. (See Table 1-I end of chapter 
on reservoir and local protection projects, Blackstone 
River Basin, for projects comprising authorized plan.) 
45A. LOWER WOONSOCKET, R.I. 
Location. On Blackstone River and tributary Mill and 
Peters Rivers in city of Woonsocket, R.I. (See 
Geological Survey map for Blackstone, R.I.) 
Existing project. Lower Woonsocket local protection 
project will consist of three independent flood 
protection units; 
Social District Unit will provide 2,960 feet of earth 
dike and concrete floodwall along left bank of 
Blackstone River. River channel will be excavated for 
about 600 feet adjacent to dike and floodwall. 
Confinement and discharge of Mill River floodflows to 
be accomplished by improvement of 1,700 feet of Mill 
River channel, supplemented by construction of 3,010 
feet of earth dike and concrete floodwall and 1,150 feet 
of twin-barreled pressurebe conduit. Similarly, 400 feet 
of channel improvement, construction of 1,020 feet of 
earth dike and concrete floodwall and 1,180 feet of 
pressure conduit will serve to confine and discharge 
floodflows of the Peters River. Interior drainage will be 
handled by constructing a pumping station with a 
capacity of 119,400 gallons per minute. 
Hamlet District Unit will consist of removal of 
Hamlet Dam, 2,000 feet of channel improvement, and 
3,100 feet of earth dike with a 75-foot section of 
concrete floodwall along right bank of Blackstone 
River. A pumping station with a capacity of 58,800 
gallons per minute will discharge interior drainage. 
Bernon Unit will provide removal of Bernon Dam 
and excavation of 250 feet of Blackstone River channel 
in vicinity of dam. 
Latest approved estimated cost for new work is $8, 
150,000 for construction and $1 million for lands, 
damages, and relocations, a total of $9,150,000. (See 
Table I-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Local interests must furnish lands 
and rights-of-way; relocate roads and utilities; hold the 
United States free from damages; and operate and 
maintain project after completion. In addition, a cash 
contribution of about 16.1 percent of construction cost 
is required owing to enhancement benefits to be 
realized. Total estimated cost for all requirements of 
local cooperation is $2,312,000. Assurances were 
received and local interests are participating in 
construction cost as required. 
Operations and results during fiscal year. New work: 
Construction of project under a multicomponent 
contract is complete except for settlement of claims. 
Condition at end of fiscal year. Construction of project 
was initiated in December 1963 and completed in 
April 1967. 
45B. WEST HILL DAM, MASS. 
Location. Dam is on West River, Mass., 3 miles above 
its confluence with Blackstone River and 2.5 miles 
northeast of Uxbridge, Mass. (See Geological Survey 
maps-Blackstone, Mass. and R.I., Milford, Mass., and 
Grafton, Mass.) 
Existing project. A rolled-earthfill dam 2,400 feet long 
with a maximum height of 51 feet above streambed. An 
ogee spillway and channel constructed through a rock 
knoll on west abutment. Outlet consists of three gatecontrolled 
conduits through spillway section. Reservoir 
has a flood control storage capacity of 12,400 acre-feet, 
equivalent to 8.3 inches of runoff from its drainage area 
of 28 square miles. Conservation storage of 3,000 acrefeet, 
equivalent to 2 inches of runoff, is authorized. 
Dam is constructed to allow for future raising to 
provide conservation storage. Estimated cost is $1,440, 
000 for construction and $940,000 for lands and 
damages including highway and utility relocations, a 
total of $2,380,000 for new work. (See Table 1-B at end 
of chapter for Act authorizing existing project.) 
Local cooperation. Section 3, Flood Control Act of 1944, 
applies. 
Operations and results during fiscal year. Maintenance: 
Operations consisted of ordinary operation and 
maintenance. 
Condition at end offiscalyear. Project is complete except 
for construction of additional recreation facilities. 
Work on continuing contract for dam and appurtenant 
structures was initiated in June 1959 and completed in 
June 1961. 
22

NEW ENGLAND DIVISION 
46. CHARLES RIVER LOCKS & DAM, 
MASS. 
Location. On the Charles River in the city of Boston, 
Suffolk County, Massachusetts, about 2,250 feet 
downstream of the existing Charles River Dam. (See 
Geological Survey Map for Boston South, Mass.) 
Existing project. A multiple-purpose earth and 
concrete dam with river pumping facilities, three 
navigation locks and an overhead highway viaduct. 
Dam about 750 feet long with maximum height of 36 
feet. Pumping facilities comprised of six 1,400 cfs 
capacity pumps. One commercial lock 40 feet by 300 
feet and 17 feet deep. Two recreational locks 25 feet by 
200 feet and 8 feet long. Overhead highway viaduct 
about 700 feet long and a roadway width of 52 feet 
consists of 11 spans of reinforced concrete slab and steel 
stringer deck. 
The project provides flood protection to the 
intensively developed urban and industrial area of 
Boston and its suburbs. The locks afford increased 
locking capacity and reduced locking time. The 
highway viaduct provides a needed highway crossing of 
the Charles River in the Warren Avenue area of Boston 
and Charlestown. Latest approved cost estimate (1970) 
for new work is $4,480,000 for lands including 
relocations and $27,320,000 for construction, a total of 
$31,800,000. Total includes local costs of $480,000 for 
lands, $4,000,000 for relocations and a cash 
contribution of $5,000,000, a total of $9,480,000. (See 
Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Local interests will be required to; 
provide all lands, easements, and rights-of-way 
necessary for construction of the project, presently 
estimated at $480,000 accomplish all modifications to 
existing sewerage and drainage facilities which may be 
required to prevent their continued emptying into the 
pool above the new dam, presently estimated at $3,640, 
000; provide all relocations of buildings and utilities, 
highways, sewers and related special facilities that will 
be required by reason of construction of the project, 
presently estimated at $360,000; hold and save the 
United States free from damages due to construction 
works; prevent encroachment on the Basin, including 
its extension, which would decrease its flood storage 
effectiveness; continue to operate and maintain 
existing public use, access, and landing facilities for 
recreational boats; provide public access to the new 
area of the basin between the new and existing dams; 
regulate the use, growth and development of 
navigation and navigation facilities in the basin; 
establish regulations prohibiting discharge of 
pollutants into the waters of the basin by users thereof, 
which regulations shall be in accordance with 
applicable laws and regulations of Federal, State and 
local authorities responsible for pollution prevention 
and control; preserve present openings-locks and 
sluices-through the existing Charles River Dam in 
order to assure the continued flow of water and passage 
of boats through the dam; bear 18.3 percent of the total 
first cost of the structural features of the project, a sum 
presently estimated at $5,000,000 which represents 50 
percent of the cost of structural features allocated to 
navigation and 100 percent of the cost of structural 
features allocated to highway transportation; operate 
and maintain all features of the project after its 
completion; furnish to the United States, without cost, 
all available engineering data pertinent to the project, 
including plans prepared for the Metropolitan District 
Commission for construction of a dam at Warren 
Avenue. 
Operations and results during fiscal year. New work: 
Operation consisted of initiation of engineering studies 
in conjunction with preparation of design memoranda, 
plans and specifications. 
Condition at end of fiscal year. Construction has not been 
started. Planning is in progress. 
47. CONNECTICUT RIVER BASIN, VT., 
N.H., MASS., AND CONN. 
Location. Works covered by this project are a series of 
dams and reservoirs on tributaries of Connecticut 
River in Vermont, New Hampshire, and 
Massachusetts, within a radius of 230 miles from 
Hartford, Conn., and local protection works at several 
cities in the basin. 
Existing project. Flood Control Act of 1936, as 
amended by act of May 25, 1937, authorized 
construction of 10 reservoirs on tributaries of 
Connecticut River in accordance with plans in House 
Document 412, 74th Congress, 2d session, as the same 
may be revised upon further investigation of 1936 
flood. Flood Control Act of 1938 approved a general 
comprehensive plan for control of floods and other 
purposes in Connecticut River Valley, as set forth in 
House Document 455, 75th Congress, 2d session, and 
authorized $11,524,000 for construction of local floodprotection 
projects in the plan. Act of October 15, 
1940, modified act of June 28, 1938, to provide 
additional protection at East Hartford, Conn., as set 
forth in House Document 653, 76th Congress, 3d 
session. Act of August 18, 1941, modified 
comprehensive plan approved in 1938 to include 
improvements recommended in House Document 653, 
76th Congress, 3d session, and House Document 724, 
76th Congress, 3d session, with such further 
modifications as may be found justifiable in discretion 
of Secretary of the Army and Chief of Engineers. Latter 
act also authorized to be appropriated additional $6 
million for local protection works and $10 million for 
reservoirs. Act of October 26, 1942, further modified 
plan by including construction of Gully Brook conduit 
at Hartford, Conn. Flood Control Act of 1944, 
authorized expenditure of $30 million in addition to 
previous authorization for comprehensive plan 
approved in 1938 and modified plan by directing 
23

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
specific consideration of an alternative plan -of 
Vermont State Water Conservation Board instead of, 
Williamsville Reservoir in West River Basin, Vt.; 
directing consultation with affected States during 
course of investigations and transmission of proposal 
and plans to each affected State for written views and 
recommendations for reservoir projects heretofore 
authorized for construction at Cambridgeport, 
Ludlow, South Tunbridge, and Gaysville, and 
resubmission ,of projects or modifications thereof to 
Congress; and rescinded authorization for construction 
at Sugar Hill site. Flood Control Act of 1950 modified 
project for flood control at Hartford, Conn., authorized 
by Flood Control Act of 1938, as amended, to include 
Folly Brook dike and conduit. Flood Control Act of 
1954 modified plan for flood control in Connecticut 
River Basin to provide for construction of a reservoir on 
Otter Brook at South Keene, N.H., in lieu of any 
reservoir or reservoirs heretofore authorized. This act 
further modified plan for West River Basin of 
Connecticut River in Vermont to consist of three 
reservoirs at Ball Mountain, The Island, and 
Townshend sites, in lieu of plan of eight reservoirs 
authorized in Flood Control Act of 1944. Flood Control 
Act of 1958 modified plan for flood control in 
Connecticut River Basin to include construction of 
Littleville Reservoir on Middle Branch of Westfield 
River, Mass., and Mad River Reservoir on Mad River, 
above Winsted, Conn. Flood Control Act of 1960 
included authorization in Connecticut River Basin of 
plan for flood protection on Chicopee River, Mass., 
substantially in accordance with House Document 434, 
86th Congress; plan for flood protection on Westfield 
River, Mass., substantially in accordance with Senate 
Document 109, 86th Congress; plan for flood control 
and related purposes on Farmington River, Conn., 
substantially in accordance with House Document 443, 
86th Congress. Flood Control Act of 1968 included 
authorization in Connecticut River Basin of plan for 
construction of Beaver Brook Reservoir, on Beaver 
Brook in Keene, N.H., substantially in accordance 
with Senate Document 60, 90th Congress; and plan for 
flood protection on Park River, Conn., substantially in 
accordance with Senate Document 43, 90th Congress. 
Local protection projects at Gardner, Mass. and 
Hartford, Vt. authorized in accordance with Section 
205 of 1948 Flood Control Act. (See Table 1-J at end of 
chapter for reservoirs and local protection works 
proposed for construction in modified comprehensive 
plan.) 
47A. BALL MOUNTAIN LAKE, VT. 
Location. Dam is on West River, 29 miles above its 
junction with Connecticut River at Brattleboro, Vt. It 
is 2 miles north of village of Jamaica, Vt. (See 
Geological Survey map for Londonderry, Vt.) 
Existing project. A rock and earthfill dam, 915 feet 
long at its crest, 265 feet above riverbed. A chute 
spillway with a concrete weir 235 feet long was 
constructed in right abutment. A reinforced concretelined 
tunnel under dam was constructed as an outlet 
works and is controlled by hydraulically operated gates 
from a tower at intake end. Reservoir is operated for 
flood control purposes and has a storage capacity of 54, 
600 acre-feet, equivalent to 6 inches of runoff from its 
drainage area of 172 square miles. Estimated cost for 
new work is $10,185,200 for construction and $350,000 
for lands and damages, a total of $10,535,200. 
Project is a unit of comprehensive plan for flood 
control and other purposes in Connecticut River Basin. 
(See Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance activities. 
Condition at end of fiscal year. Project is complete. 
Construction of dam and appurtenant works was 
initiated in May 1957 and completed in November 
1961. 
47B. BARRE FALLS DAM, MASS. 
Location. Dam is on Ware River in town of Barre, 
Mass., 31.9 miles above confluence of Ware and Swift 
Rivers. It is 13 miles, northwest of Worcester, Mass. 
(See Geological Survey maps-Barre, Mass., and 
Wachusett Mountain, Mass.) 
Existing project. Dam, of earth and rockfill 
construction, is 885 feet long with a maximum height of 
62 feet above streambed. Spillway is concrete chutetype 
with a crest length of 60 feet in right abutment of 
dam. Outlet works, including a reinforced concrete 
conduit and gate structure, are founded on bedrock 
under left abutment. Included in project are three 
dikes with a total length of 3,215 feet and a maximum 
height of 48 feet in saddles in rim of reservoir. Flood 
control storage capacity of reservoir is 24,000 acre-feet, 
equivalent to 8.2 inches of runoff from drainage area of 
55 square miles. Reservoir is operated as a unit of a 
coordinated system of reservoirs for control of floods in 
Connecticut River Basin. Completed cost of new work 
is $1;928,800 for construction and $39,000 for lands 
and damages including highway relocation, a total of 
$1,967,800 for new work. (See Table 1-B at end of 
chapter for Act authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. Maintenance: 
Ordinary operation and maintenance activities. 
Condition at end of fiscal year. Project is complete. 
Construction of dam and appurtenant works was 
initiated in May 1956 and completed in May 1958. 
47C. BEAVER BROOK LAKE, N.H. 
Location. On Beaver Brook about two and one half 
miles north of the center of Keene, Cheshire County in 
24

NEW ENGLAND DIVISION 
southwestern New Hampshire. (See Geological Survey 
map for Keene, N.H.-Vermont.) 
Existing project. A multiple-purpose earthfilled dam 
about 950 feet long with maximum height of 60 feet. A 
concrete chute-type spillway with ogee weir 100 feet 
long will be constructed on rock in right abutment. A 
concrete drop intake structure with a 5 feet high by 5 
feet wide concrete conduit will serve as an uncontrolled 
automatic outlet for flood control. A permanent pool 
for recreation and future water supply will be 
maintained by a gated weir at the intake structure. A 
gated 24-inch pipe with a box inlet will provide a lowflow 
outlet and will serve as a draw-down inlet when 
necessary. Provisions for future water supply will 
consist of the construction of two intake pipelines, two 
gate valve controls, and a 24" pipeline in the box 
conduit outlet. An upstream rolled earth water control 
structure about 430 feet long and 11 feet high will 
create a 50-acre conservation pool, which will be 
maintained by an overflow box inlet structure and 36- 
inch corrugated metal pipe outlet to handle normal 
flows. An 80-foot grass spillway will be located along 
the left bank of the structure to handle flood flows. 
Dam and appurtances will impound a multi-purpose 
reservoir with total storage capacity of 5,750 acre-feet 
equivalent to 18.0 inches of runoff from its drainage 
area of 6 square miles. Of total storage, 2,700 acre-feet, 
equivalent to 8.6 inches of runoff, would be allocated 
for flood control, and 3,000 acre-feet would be 
allocated for recreation and future water supply. The 
203 acre permanent pool will offer opportunity for 
public outdoor recreation and will include day use 
facilities for swimming, picnicking and fishing. 
Development of these facilities is on the premise that 
water supply will not be used for the initial 20 years of 
project operation. The reservoir will be operated as an 
integral unit in the coordination system of reservoirs in 
the Connecticut River Basin. Latest approved cost 
estimate (1970) for new work is $635,000 for lands 
including relocations and $1,365,000 for construction, 
a total of $2,000,000. Total includes local cash 
contribution of $280,000 and reimbursement of $540, 
000 for costs allocated to recreation and water supply. 
(See Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Local interests are required to 
contribute 13.9 percent of the total project cost, 
representing the cost of lands, easements, rights-of-way, 
and relocations allocated to flood control, either in cash 
or in kind, presently estimated at $280,000, and bear 
all costs of operation, maintenance, and replacements 
for flood control; repay all costs allocated to water 
supply, in accordance with the Water Supply Act of 
1958, as amended, presently estimated at $470,000 
exclusive of interest; pay, contribute in kind, or repay 
with interest, one-half of the separable cost of the 
project allocated to recreation and fish and wildlife 
enhancement, presently estimated at $70,000, 
administer project land and water areas for recreation 
and fish and wildlife enhancement, and bear all 
specific costs of operation, maintenance and 
replacement of lands and facilities for recreation and 
fish and wildlife enhancement, all in accordance with 
the Federal Water Project Recreation Act; hold and 
save the United States free from damages due to the 
construction works; protect channels downstream from 
the reservoir from encroachment which would 
adversely affect reservoir operation; exercise to the full 
extent of their legal capability, control against removal 
of water in the watershed which will affect the 
reservoir's water supply storage and the development of 
dependable stream regulations; and obtain water 
rights needed for storage and use of water, resolve any 
conflicts in water rights necessary to assure effective 
operation of the project, and use water in a manner 
consistent with Federal and State laws, Estimated cost 
to local interests is $820,000. Formal assurances will be 
requested during final design. 
Operations and results during fiscal year. New work: 
Operations consisted of initiation of engineering studies 
in conjunction with preparation of design memoranda, 
plans and specifications. 
Condition at end of fiscal year. Construction has not been 
started. Planning is in progress. 
47D. BIRCH HILL DAM, MASS. 
Location. Dam is on Millers River, 27.3 miles above its 
junction with Connecticut River. It is 1.3 miles east of 
South Royalston, Mass., and 7.5 miles northwest of city 
of Gardner, Mass. (See Geological Survey maps for 
Royalston and Winchendon, Mass.-N.H. and 
Templeton, Mass.) 
Existing project. Dam is rolled-earth type with a 
dumped rock shell. It has a top length of 1,400 feet, a 
top width of 25 feet, and is 56 feet above riverbed. 
Spillway consists of three concrete weirs in two natural 
saddles and an abandoned railroad cut northwest of 
dam. Main weirs have a crest length of 720 and 350 
feet, respectively, and the weir in the railroad cut has a 
crest length of 23 feet. Outlet works are on rock at right 
end of dam and consist of an intake channel 1,500 feet 
long, a gate structure with a gatehouse directly above, 
and an outlet channel 1,150 feet long. Outlet works are 
controlled by four 6- by 12-foot roller gates 
mechanically operated from gatehouse above. 
Reservoir is operated for flood control purposes and has 
a storage capacity of 49,900 acre-feet, equivalent to 5.3 
inches of runoff from its drainage area of 175 square 
miles. Estimated cost of new work for project is $1,545, 
000 for construction and $3,075,000 for lands and 
damages, a total of $4,620,000. Project is a unit of 
comprehensive plan for flood control and other 
purposes in Connecticut River Basin. (See Table 1-B at 
end of chapter for Acts authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
25

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. New work: 
Contract for construction of additional recreational 
facilities was continued. Contract includes construction 
of roads, parking areas, comfort stations and utilities. 
Maintenance: Ordinary operation and maintenance 
activity. 
Condition at end offiscalyear. Project is complete except 
for construction of additional recreational facilities. 
Construction of dam and appurtenant works was 
initiated in June 1940 and completed in February 
1942. Recreational facilities construction contract 
approximately 90 percent complete. 
47E. CHICOPEE FALLS, MASS. 
Location. Chicopee Falls local protection project is on 
left (east) bank of Chicopee River in city of Chicopee, 
Mass. (See Geological Survey map for Springfield, 
North, Mass.) 
Existing project. About 1,400 feet of: concrete 
floodwalls and 3,620 feet of earth dikes along left bank 
of Chicopee River extending between Chicopee Dam 
and high ground at lower end of property owned by the 
U.S. Rubber Co. Right bank excavated along 
downstream half of project to provide additional 
waterway area needed because of encroachment on 
channel resulting from construction of dike on left 
bank. Surface drainage from large high area above 
plants is intercepted into river by two gravity outfall 
systems. Two pumping stations dispose of surface 
runoff, industrial process water, sewage and seepage 
collected in low area during flood stage. Latest 
approved estimated cost for new work is $2,585,000 for 
construction and $70,000 for lands, damages, and 
relocation, a total of $2,655,000 for new work. Total 
includes $475,000 estimated local costs. (See Table 1-B 
at end of chapter for Act authorizing existing project.) 
Local cooperation. Local interests must assume at least 
20 percent of cost (except costs of planning, design, and 
acquisition of water rights) of completed project, 
payable either as construction proceeds or pursuant to 
a contract providing for repayment with interest within 
50 years. Actual cost, or fair market value of lands, 
easements, rights-of-way, and work performed or 
services rendered prior to completion of construction of 
project, which are furnished by a non-Federal entity, 
shall be included in share of cost to be borne by non- 
Federal entity. Local interests must furnish lands and 
rights-of-way for construction; provide sewer and 
utility alterations for construction and operation, 
incluinng construction of a water intake and extension 
of a low dam for furnishing water to U.S. Rubber Co. 
as a replacement for existing facilities; maintain and 
operate works after completion; and permit no 
encroachment on improved channels or on ponding 
areas or, if ponding areas or capacities are impaired, 
provide substitute storage capacity. Total estimated 
costs for all requirements of local cooperation are $475, 
000 including $20,000 for lands, $35,000 for 
relocations, and $420,000 cash contribution. 
Assurances accepted and all requirements are being 
fulfilled. 
Operations and results during fiscal year. New work: Final 
audit will determine final cost sharing. 
Condition at end of fiscal year. Construction of project 
was initiated in October 1963 and completed in July 
1965. Remaining work consists of completing audit of 
local costs to determine final cost sharing. 
47F. COLEBROOK RIVER LAKE, CONN. 
Location. Damsite is in town of Colebrook, Litchfield 
County, Conn., on West Branch Farmington River 
about 3.9 miles upstream from its confluence with Still 
River at Riverton, Conn., and about 1.5 miles 
upstream from Goodwin (Hogback) Dam. (See 
Geological Survey map for Winsted, Conn.) 
Existing project. Construction of a combined earth and 
rockfilled dam 1,300 feet long with a maximum height 
of 223 feet above streambed. An earth dike 1,240 feet 
long and 54 feet high prevents reservoir overflow into 
Sandy Brook. Spillway is chute type with a crest length 
of 205 feet. Outlet consists of a rock tunnel 10 feet in 
diameter. Control tower contains three, 4 by 8 feet 
hydraulic gates to regulate reservoir discharge. 
Capacity of reservoir includes 11,000 acre-feet of 
existing water supply in Goodwin Dam Reservoir pool, 
30,700 acre-feet of new water-supply storage, 50,800 
acre-feet for flood control storage, 5,000 acre-feet for 
fish and wildlife purposes and 1,000 acre-feet dead 
storage, a total of 98,500 acre-feet equivalent to 15.5 
inches of runoff from its drainage area of 118 square 
miles. Latest approved estimated cost for new work is 
$8,323,000 for construction and $5,847,000 for lands, 
damages, and relocations, a total of $14,170,000 for 
new work. (See Table I-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Water supply contract was signed by 
Hartford Connecticut Metropolitan Water District. 
Repayment will be made in accordance with provisions 
of 1958 Water Supply Act. 
Operations and results during fiscal year. New work: Land 
acquisition nearly completed. Contract in amount of 
$193,800 for recreational development that includes 
boat ramp and parking facilities was awarded and 
completed. Maintenance: Ordinary operation and 
maintenance activity. 
Condition at end of fiscal year. Project is complete. 
Construction of dam and appurtenant works was 
initiated in May 1965 and completed in June 1969. 
Construction of recreation facilities was initiated in 
August 1969 and completed in June 1970. 
47G. CONANT BROOK DAM, MASS. 
Location. Site is in south central part of Massachusetts 
in town of Monson. Damsite, across Conant Brook, is 
26

NEW ENGLAND DIVISION 
about 2 miles southwest of community of Monson. (See 
Geological Survey map for Monson, Mass.) 
Existing project. Dam is of combined rolled-earthfill 
and rockfill construction, about 1,050 feet long, with a 
maximum height of 85 feet above streambed. A 
concrete ogee spillway, 100 feet long, and a spillway 
channel on right bank carries reservoir overflow 
around dam. Flood control capacity of reservoir is 3, 
740 acre-feet, equivalent to 9 inches of runoff from 
drainage area of 7.8 square miles. Latest approved 
estimated cost for new work is $1,935,000 for 
construction and $1,015,000 for lands, damages, and 
relocation of roads and utilities, a total of $2,950,000 
for new work. (See Table 1-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. Maintenance: 
Ordinary operation and maintenance activity. 
Condition at end of fiscal year. Construction of dam, 
highway relocations, and appurtenances was initiated 
in June 1964 and completed in December 1966. 
47H. GARDNER, MASS. 
Location. Along Mahoney and Greenwood Brooks in 
city of Gardner, Mass., about 60 miles northwest of 
Boston, Mass., and 25 miles north of Worcester, Mass. 
(See Geological Survey Map for Gardner, Mass.) 
Existing project. A 935-foot long dam with a 60-foot 
spillway and outlet works at north end of Wright's 
Reservoir; a 970-foot flanking dike along west shore of 
reservoir; strengthening existing outlet structure at 
Wayside Pond on Mahoney Brook; providing two pipe 
outlets at Upper Wright's Reservoir; widening and 
deepening 700 feet of Mahoney Brook which includes 
construction of a 45-foot concrete spillway, two earth 
dikes totaling 680 feet long and channel excavation 
and realignment; and removal of several channel 
obstructions. Latest approved estimated cost for new 
work is $493,900 for construction and $35,000 for 
lands, damages and relocations, a total of $528,900. 
Lands and relocations are a local cost. (See Table 1-B 
at end of chapter for Act authorizing existing project.) 
Local cooperation. Section 3, Flood Control Act of 1936, 
as amended, applies. In addition, local interests must 
prevent encroachment in flood plain of the stream and 
establish channel lines within limit of the 
improvement. Fully complied with. Total costs were 
$20,000 for lands and $15,000 for relocations, a total of 
$35,000. 
Operations and results during fiscal year. New work: 
Administrative costs incurred in processing claim. 
Condition at end of fiscal year. Project is complete. 
Construction of project was initiated in August 1964 
and completed in October 1965. 
47I. GAYSVILLE LAKE, VT. 
Location. Dam would be on White River one-half 
mile southwest of Gaysville, Vt. and about 32 miles 
above the Connecticut River. (See Geological Survey 
Map for Randolph, Vt.) 
Existing project. Based on restudy the project provides 
for construction of an earth-filled dam to impound a 
multiple-purpose reservoir with total storage capacity 
of 82,500 acre-feet, of which 48,200 acre-feet is 
allocated to flood control, 25,500 acre-feet allocated to 
joint use for flood control, recreation and low-flow 
augmentation and 8,800 acre-feet reserved for winter 
pool for preservation of fishlife. Project would be 
operated as a unit of comprehensive plan for flood 
control and related purposes in Connecticut River 
Basin. Latest approved cost estimate (1969) for new 
work is $13,700,000 for construction and $15,000,000 
for lands, damages, and relocations, a total of $28,700, 
000. Total includes an estimated $1,500,000 for local 
costs. (See Table 1-B at end of chapter for Acts 
authorizing existing project.) 
Local cooperation. Local interests must assume one-half 
the separable first costs allocated to recreation and fish 
and wildlife purposes presently estimated at $1,500, 
000; administer, operate and maintain, including 
replacement, the recreation and fish and wildlife lands 
and facilities, and bear one-half the cost of future 
additions for recreation purposes made at intervals 
during the project life to meet the needs of increased 
attendance, all in accordance with the Federal Water 
Project Recreation Act; and exercise to the full extent 
of their legal capability control against removal of 
stream flow made available by reservoir storage or lowflow 
regulation. Formal assurances of local cooperation 
have not been requested. 
Operations and result during fiscal year. New work: 
Advance engineering and design was continued and is 
12 percent complete. All work was halted due to 
reclassification of project to inactive category in 
response to request to do so by Governor of Vermont. 
Condition at end of fiscal year. Project classified as 
inactive. Remaining work consists of completing design 
and awarding contracts for road relocations and 
construction of dam and appurtenant structures. No 
further work will be performed unless "inactive" 
classification is changed. 
47J. KNIGHTVILLE DAM, MASS. 
Location. Dam is on Westfield River, 27.5 miles above 
its junction with Connecticut River. It is 4 miles north 
of town of Huntington, Mass., and about 12 miles west 
of city of Northampton, Mass. (See Geological Survey 
map for Westhampton, Mass.) 
Existing project. Dam is hydraulic earthfill type with a 
dumped rock shell and a downstream rock toe. It has a 
top length of 1,200 feet, a top width of 30 feet, and 160 
feet above riverbed. Spillway is a curved concrete weir 
27

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
410 feet long, on rock in a saddle at right end of dam. 
Outlet works are in right abutment and consist of an 
intake channel 280 feet long and a 16-foot-diameter 
tunnel through rock. Tunnel is 605 feet long and 
controlled by three 6- by 12-foot broome gates 
mechanically operated through a control tower from a 
gatehouse above. Provision has been made for future 
installation of a penstock for development of power at 
the site in accordance with a request by Federal Power 
Commission. Reservoir is now operated for flood 
control purposes and has a storage capacity of 49,000 
acre-feet, equivalent to 5.6 inches of runoff from its 
drainage area of 164 square miles. Cost of completed 
project is $2,399,200 for construction and $821,200 for 
lands and damages, a total of $3,220,400. Project is a 
unit of comprehensive plan for flood control and other 
purposes in Connecticut River Basin. (See Table 1-B at 
end of chapter for Acts authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. Maintenance: 
Ordinary operation and maintenance activities. 
Condition at end of fiscal year. Project is complete. 
Construction of dam and appurtenant works was 
initiated in August 1939 and completed December 
1941. 
47K. LITTLEVILLE LAKE, MASS. 
Location. Dam is on Middle Branch of Westfield 
River 1 mile above its confluence with main stem of 
Westfield River and 25.2 miles above confluence of 
Westfield River with Connecticut River, in town of 
Chester. (See Geological Survey map, Chester, Mass.) 
Existing project. A rolled-earth and rockfill dam, 1,360 
feet long with a maximum height of 164 feet above 
streambed. Concrete chute spillway is on east bank of 
river. Reservoir has a total storage capacity of 32,400 
acre-feet, of which 23,000 acre-feet is for flood control, 
equivalent to 8.2 inches of runoff from controlled net 
drainage area of 52.3 square miles. Remaining 9,400 
acre-feet of storage, equivalent to 3.4 inches of runoff, is 
for future water supply. Littleville Reservoir will be 
operated in conjunction with Knightville Reservoir 
when flows on Westfield River are expected to exceed 
channel capacity. It would also be operated in 
conjunction with other existing or proposed reservoirs 
to reduce floodflows on lower Connecticut River. 
Littleville project was authorized as a single-purpose 
flood control project. Under provision of title III of this 
act (Water Supply Act of 1958) city of Springfield, 
Mass., furnished assurances for participating in cost of 
project including provisions for future water supply. 
Estimated cost of new work is $5,863,000 for 
construction and $1,150,000 for lands and damages, 
including relocation of a highway, utilities, cemeteries, 
and structures, a total of $7,013,000 for new work. (See 
Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, and title III, Water Supply Act of 1958 
applies and fully complied with. 
Operations and results during fiscal year. Maintenance: 
Ordinary operation and maintenance activity. 
Condition at end of fiscal year. Project is complete. 
Construction of dam and appurtenances was initiated 
under a multicomponent contract in June 1962 and 
completed in September 1965. 
47L. MAD RIVER LAKE, CONN. 
Location. Dam is on Mad River, 2.3 miles upstream 
from its junction with Still River (a tributary of 
Farmington River), a major tributary of Connecticut 
River. (See Geological Survey Map- Winsted, Conn.) 
Existing project. Dam is rolled-earthfill type with 
rockfill slope protection. It has a top length of 940 feet, 
a top width of 25 feet accommodating a gravel access 
road and a maximum height of 178 feet above 
streambed at center line of dam. Project includes a dike 
2,340 feet long with a top width of 25 feet and a 
maximum height of 60 feet across two saddles in left 
abutment. Outlet works, on right bank, are founded on 
bedrock and consist of an ungated 45-inch diameter 
circular conduit 923 feet long. Spillway is on a rock 
knob on left abutment between dam and dike. The 
weir is a low concrete ogee section founded on bedrock 
and 340 feet long at spillway crest elevation 983. 
Reservoir has a storage capacity of 9,700 acre-feet 
equivalent to 10 inches of runoff from its drainage area 
of 18.2 square miles. This storage includes a 10-acre 
permanent pool with a capacity of 188 acre-feet. 
Remaining storage will be used for flood control. 
Project functions as a unit of coordinated system of 
reservoirs for flood control in Connecticut River Basin. 
Total project cost for new work was $3,230,800 for 
construction and $2,210,000 for highway relocation, 
lands and damages, a total of $5,440,800 for new work. 
This total includes $670,000 in local costs for land and 
damages. Estimate for proposed recreational 
development is $300,000. (See Table 1-B at end of 
chapter for Act authorizing existing project.) 
Local cooperation. Local interests must furnish lands 
and rights-of-way other than highway relocations, zone 
channel through damaged areas to prevent further 
encroachments, hold the United States free from 
damages and maintain and operate project. Fully 
complied with. Local interests must also bear 50 
percent of future recreational development in 
accordance with 1965 Federal Water Project 
Recreation Act. 
Operations and results during fiscal year. New work: 
Funds were received for initiation of recreational 
development. Planning was begun. 
Condition at end offiscalyear. Project is complete except 
for proposed recreational development. Construction 
of dam and appurtenances was initiated in June 1961 
and completed inJune 1963. 
28

NEW ENGLAND DIVISION 
47M. NORTH HARTLAND LAKE, VT. 
Location. Dam is on Ottauquechee River, 1.5 mile: 
above its junction with Connecticut River and 1 mile 
northwest of North Hartland, Vt. Reservoir extend 
upstream 5.5 miles. (See Geological Survey map for 
Hanover, N.H.-Vt.) 
Existing project. A rolled-earthfill dam, 1,520 feet long 
185 feet above streambed, providing a total storage 
capacity of 71,400 acre-feet. A side-channel spillway 
with a concrete weir 450 feet long provided on lefl 
bank. Outlet consists of a 14-foot diameter tunnel cul 
through rock and located in left bank, a concrete intake 
and gate-operating tower, and hydraulically operated 
control gates. An outlet channel returns discharge to 
main stream below dam. An earth dike 2,100 feet long 
with a maximum height of 52 feet is across a saddle 
south of main dam. Drainage area controlled is 22C 
square miles or practically all of drainage area of 
Ottauquechee River. Reservoir is operated as a unit of 
a coordinated system of reservoirs for flood control in 
Connecticut River Basin. Latest cost estimate for new 
work is $6,710,000 for construction and $950,000 for 
lands and damages (including highway and utility 
relocations), a total of $7,660,000 for new work. Total 
includes an estimated $295,000 as local share of 
additional recreation facilities to be constructed. (See 
Table 1-B at end of chapter for Acts authorizing 
existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. Local interests must also bear 50 percent of 
future recreational development in accordance with 
1965 Federal Water Project Recreation Act. 
Operations and results during fiscal year. New work: 
Contract completed for clearing additional areas to be 
inundated by the George Perkins Marsh Conservation 
Lake. Maintenance: Ordinary operation and 
maintenance activities. 
Condition at end of fiscal year. Project is complete except 
for construction of additional recreation facilities. 
Construction of dam was initiated in June 1958 and 
completed in June 1961. 
47N. NORTH SPRINGFIELD LAKE, VT. 
Location. Dam is in town of Springfield, Vt., on Black 
River, 8.7 miles above its junction with Connecticut 
River, and 3 miles northwest of Springfield, Vt. (See 
Geological Survey maps-Ludlow, Vt. and Claremont, 
N.H.) 
Existing project. A rolled-earthfill dam 2,940 feet long 
with a maximum height of 120 feet above riverbed. 
Side channel spillway in left abutment of dam has a 
crest length of 384 feet. A discharge channel, about 425 
feet long, connects side channel section to a short basin 
which has a length of 200 feet. Outlet works consist of 
an approach channel, 735 feet long, a 12.75-foot 
horseshoe-shaped concrete conduit, 604 feet long, and 
discharges into spillway basin. Three hydraulically 
451-584 0-72-3 
operated 5- by 12-foot slide gates in intake structure are 
provided to control releases. Reservoir has a flood 
s control storage capacity of about 50,600 acre-feet. 
Drainage area controlled is 158 square miles, or 77 
s percent of total drainage area of Black River. Reservoir 
r is operated as a unit of a coordinated system of 
reservoirs for flood control in Connecticut River Basin. 
Cost estimate for new work is $5,330,000 for 
construction and $2,050,000 for lands and damages, 
including highway, cemetery, and utility relocations, a 
t total of $7,380,000 for new work. Total includes an 
t estimated $300,000 as local share of additional 
I recreation facilities to be constructed. (See Table 1-B at end of chapter for Acts authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. Local interests must also bear 50 percent of 
future recreational development in accordance with 
1965 Federal Water Project Recreation Act. 
f Operation and results during fiscal year. New work: 
Contract completed for clearing of areas to be 
inundated by the new Black River Conservation pool. 
Maintenance: Ordinary operation and maintenance 
activities. 
Condition at end of fiscal year. Project is complete except 
for construction of additional recreation facilities. 
Construction of dam was initiated in May 1958 and 
completed in November 1960. 
470. OTTER BROOK LAKE, N.H. 
Location. Dam is on Otter Brook, 2.4 miles upstream 
from its junction with The Branch, which flows 2.5 
miles to Ashuelot River at Keene. (See Geological 
Survey maps-Keene, N.H.-Vt., and Monadnock, 
N.H.) 
Existing project. Dam is rolled-earthfill type with 
rockfill slope protection. It has a top length of 1,288 
feet, a top width of 25 feet, accommodating a paved 
access road, and a maximum height of 133 feet above 
streambed. Outlet works, on right bank, are founded 
on bedrock and consist of a 6-foot diameter horseshoeshaped 
conduit 540 feet long controlled by three 
hydraulically operated slide gates. Spillway is in a 
natural saddle in right abutment, separated from dam 
by a rock knob. Weir is a low concrete ogee section 
founded on bedrock and 145 feet long at spillway crest 
elevation 781. Reservoir operated for flood control 
purposes, has a storage capacity of 17,600 adf,*,* 
and permanent storage capacity of 700 acre-feet 
totaling 18,300 acre-feet, equivalent to 7.3 inches of 
runoff from itsdrainage area of 47 square miles. Project 
is operated as a unit of a coordinated system of 
reservoirs for flood control in Connecticut River Basin. 
Cost estimate for new work is $2,881,600 for 
construction and $1,378,400 for lands and damages, 
including highway relocation, a total of $4,260,000 for 
new work. Total includes an estimated $100,000 as 
local share of additional recreation facilities to be 
29

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
constructed. (See Table 1-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must also bear 50 percent of 
future recreational development in accordance with 
1965 Federal Water Project Recreation Act. 
Operations and results during fiscal year. Maintenance: 
Ordinary operation and maintenance activities. 
Condition at end of fiscal year. Project is complete except 
for construction of additional recreation facilities. 
Construction of dam and appurtenant works was 
initiated in September 1956 and completed in August 
1958. 
47P. SUCKER BROOK DAM, CONN. 
Location. Damsite is about 2 miles southwest of 
Winsted, Conn., on Sucker Brook, in town of 
Winchester, Conn., about 400 feet upstream from the 
brook's entrance into Highland Lake. Sucker Brook is 
a subtributary of Farmington River in Connecticut 
River Basin. (See Geological Survey Map for Winsted, 
Conn.) 
Existing project. Dam will be a rolled-earthfill 
structure with a length of 1,160 feet and a maximum 
height of 68 feet above streambed. A concrete 
uncontrolled chute spillway, 60 feet long, and a 
spillway channel will be constructed at northeast end of 
dam for carrying reservoir overflow around the dam 
into Highland Lake. Capacity of reservoir, for flood 
control storage, will be 1,480 acre-feet, equivalent to 8 
inches of runoff from the intercepted drainage area of 
34 square miles. Latest approved cost estimate for new 
work is $2,390,000 for construction and $240,000 for 
relocations and lands and damages, a total of $2,630, 
000 total includes local costs of $410,000 for lands and 
relocations including modificatipns to Highland Lake 
Dam. (See Table 1-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Local interests shall assume at least 
20 percent of the cost :(except costs of planning, design, 
and acquisition of water rights) of completed project, 
payable as construction proceeds or pursuant to a 
contract providing for repayment with interest within 
50 years. Actual cost for fair market value of lands, 
easements, rights-of-way and -work performed or 
services rendered before completion of construction, 
which are furnished by non-Federal interests, will be 
included in the share of the cost to be borne by non- 
Federal interests. Local interests must provide lands 
and :rights-of-way for construction; hold the United 
States free from damages; maintain and operate all 
works after completion; establish encroachment lines 
along Highland Lake Stream beyond which, in the 
direction of the waterway, no obstruction or 
encroachment shall be placed unless authorized by 
Connecticut Water Resources Commission; and 
modify Highland Lake Dam in a manner satisfactory 
to the Chief of Engineers to provide additional flood 
protection for Winsted, Conn. Total estimated cost for 
all requirements of local cooperation is $410,000. 
Assurances have been received and requirements are 
being met. 
Operations and results during fiscal year. New work: 
Continuing contract for construction of dam and 
appurtenances was essentially completed. Principal 
operations consisted of placing concrete at wingwalls, 
retaining walls spillway weir and bridge deck; placing 
rock slope protection along the top of dam;installation 
of guard railing and topsoiling and seeding of area. 
Contractor earnings totaled $350,000. 
Condition at end offiscalyear. Total project is 99 percent 
complete. Remaining work consists of miscellaneous 
cleanup:items. 
47Q. SURRY MOUNTAIN LAKE, N.H. 
Location. Dam is on Ashuelot River, 34.6 miles above 
its junction with Connecticut River and 5 miles north 
of Keene, N.H. (See Geological Survey maps for Keene 
and Bellows Falls, N.H.-Vt.) 
Existing project. Dam is rolled-earth type with a 
dumped rock shell and a downstream rock toe. It has a 
top length of 1,670 feet,. a top width of 30 feet, and 86 
feet above riverbed. Spillway is at right end of dam and 
of open side-channel type with a low concrete weir 338 
feet long. Spillway discharge channel is in rock cut and 
2,000 feet long. Outlet works, in right abutment, consist 
of a 748-foot-long intake channel and a 10-footdiameter, 
horseshoe-shaped tunnel through rock. The 
tunnel is 383 feet long and discharges into spillway 
channel. Outlet works are controlled by two 4-foot 6- 
inch by 10-foot broome gates mechanically operated 
through a shaft from a gatehouse above. Reservoir is 
operated for flood control purposes and has a storage 
capacity of 32,500 acre-feet, equivalent to 6.1 inches of 
runoff from its drainage area of 100 square miles. 
Estimated cost of new work for project is $2,335,000 for 
construction and $385,000 for lands and damages, a 
total of $2,720,000. Project is a unit of comprehensive 
plan for flood control and 'other purposes in 
Connecticut River Basin. (See Table 1-B at end of 
chapter for Acts authorizing existing project.) 
Local cooperation. Section 2, Flood Control-Act of 1938 
applies. 
Operations and results during fiscal par. New work: 
Contract for construction of recreation facilities= was' 
completed. Contract provided for construction of 
access roads, parking areas, potable water supply 
system and beach and picnic areas. Maintenance: 
Ordinary operation and maintenance. 
Condition at end of fiscalyeari Project is complete except 
for construction of additional recreation facilities. 
Construction of dam and appurtenant works was 
initiated in August 1939 and completed in June 1942. 
Construction of recreation facilities initiated in 
October 1968 and completed in September 1969. 
30

NEW ENGLAND DIVISION 
47R. THREE RIVERS, MASS. 
Location. Local flood protection for community of 
Three Rivers is at confluence of Quaboag, Ware and 
Chicopee Rivers in town of Palmer in south central 
part of Mass. (See Geological Survey map for Palmer, 
Mass.) 
Existing project. Remove New England Power Co. 
Dam and power station superstructure on Chicopee 
River; deepen and widen Chicopee River above this 
dam and at mouth of Ware and Quaboag Rivers; 
remove Bridge Street Bridge in Three Rivers and 
construct a new bridge at this site; construct a new span 
at Main Street Bridge; alterations to railroad bridge in 
Three Rivers; alterations to existing sewers and utility 
lines affected by the work; riprapping for bank 
protection; and disposal of excavated waste materials 
along banks at mouth of Ware and Quaboag Rivers. 
Improve about 5,200 feet of river channel to a 
minimum bottom width of 80 feet and a maximum of 
200 feet. Latest approved cost estimate for new work is 
$1,580,000 for construction and $700,000 for lands and 
damages including removal of highway bridge, 
construction of a new highway bridge, alteration to 
highway bridge at Main Street and to sewer system; a 
total of $2,280,000. (See Table 1-B at end of chapter for 
Act authorizing existing project.) 
Local cooperation. Items for construction required of 
local interests without cost to the United States 
include; removal of highway bridge at Bridge Street, 
construction of a new highway bridge at Bridge Street, 
alterations to highway bridge at Main Street, and 
extension of existing sewers into the river. In addition, 
they must furnish lands and rights-of-way necessary for 
work; obtain permission for the United States to 
remove New England Power Co. dam and powerhouse 
superstructure on Chicopee River and two buildings 
which obstruct the improvement; and permit no 
encroachment on the improved channel, including 
waterway areas provided under bridges. Local interests 
must contribute not less than 20 percent of project cost, 
except costs of planning, design, and acquisition of 
water rights payable either as construction proceeds or 
pursuant to a contract providing for repayment with 
interest within 50 years. Actual cost or fair market 
value of lands, easements and rights-of-way and work 
performed or service rendered shall be included in 
share of cost to be borne by non-Federal entity. Total 
estimated costs for all requirements of local cooperation 
are $700,000. Fully complied with. 
Operations and results during fiscal year. New work: 
Administrative costs for completing final audit. 
Condition at end of fiscal year. Existing project was 
initiated in January 1964 and completed in May 1966. 
Alterations and extension of railroad bridge was 
completed in May 1966. Remaining work consists of 
completing final audit. 
47S. TOWNSHEND LAKE, VT. 
Location. Dam is on West River, 19.1 miles above its 
junction with Connecticut River at Brattleboro,, Vt., 
and about 2 miles west of Townshend, Vt. Reservoir 
extends upstream about 4 miles. (See Geological 
Survey maps-Saxtons River, Vt., and Londonderry, 
Vt.) 
Existing project. A rolled-earthfill dam, 1,700 feet long 
at its crest, 133 feet above streambed, and providing a 
total storage capacity of 33,600 acre-feet for flood 
control purposes. A side-channel spillway with a 
concrete weir 438.9 feet long, having a discharge 
capacity of 201,000 cubic feet per second, in left 
abutment. A reinforced concrete conduit under dam 
and on rock comprises outlet works and is controlled by 
mechanically operated gates from a gate tower at 
intake end. Drainage area controlled is 278 square 
miles gross and 106 square miles net. Reservoir is 
operated as a unit of a coordinated system for flood 
control in Connecticut River Basin. Estimated cost of 
new work is $5,570,000 for construction and $1,870,000 
for lands and damages including highway relocations 
and utilities, a total of $7,440,000. (See Table 1-B at 
end of chapter for Act authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. New work: 
Contract for construction of recreation facilities was 
completed. Contractor earnings totaled $20,000 for the 
fiscal year. Contract provided for construction of 
extension to access road, parking areas, picnic facilities 
and conversion of chemical sanitary facilities to flush 
type. Maintenance: Ordinary operation and 
maintenance activities. 
Condition at end of fiscalyear. Project is complete except 
for construction of additonal recreation facilities. 
Construction of dam and appurtenant works was 
initiated in November 1958 and completed in June 
1961. Initial phase of additional recreational facilities 
completed in October 1969. 
47T. TULLY LAKE, MASS. 
Location. Dam is on East Branch of Tully River, 3.9 
miles above its junction with Millers River. It is 1 mile 
north of Fryville, Mass., and 3.5 miles north of Athol, 
Mass. (See Geological Survey map for Royalston, 
Mass.-N.H.) 
Existing project. Dam is rolled-earth type with a 
dumped rock shell. It has a top length of 1,570 feet, a 
top width of 30 feet, and 62 feet above riverbed. 
Spillway is on rock in a saddle about 800 feet from left 
end of dam and is a low, concrete weir, 255 feet long. 
Spillway approach channel is 600 feet long and 
discharge channel is chute type 1,775 feet long. Outlet 
works, in left abutment, consist of a 6-foot-diameter 
tunnel through rock. Tunnel is 274 feet long and 
controlled by two 3-foot 6-inch by 6-foot slide gates 
31

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
mechanically operated through a shaft from a 
gatehouse above. Outlet works intake and outlet 
channels are 500 and 580 feet long, respectively. 
Project was constructed with provision for future 
raising for inclusion of power at site. Reservoir is 
operated for flood control purposes and has a storage 
capacity of 22,000 acre-feet which is equivalent to 8.3 
inches of runoff from its drainage area of 50 square 
miles. Cost of completed project is $1,183,600 for 
construction and $368,000 for lands and damages, a 
total of $1,551,600. Project is a unit of comprehensive 
plan for flood control and other purposes in 
Connecticut River Basin. (See Table 1-B at end of 
chapter for Acts authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. Maintenance: 
Ordinary operation and maintenance activities. 
Condition at end of fiscal year. Project is complete. 
Development of recreational facilities at project site 
was postponed pending decision relative to raising the 
dam to provide water supply storage. Construction of 
dam and appurtenant works was initiated in March 
1947 and completed in September 1949. 
47U. UNION VILLAGE DAM, VT. 
Location. Dam is on Omponpanoosuc River, 4 miles 
above its junction with Connecticut River. It is onefourth 
mile north of Union Village, Vt., and 11 miles 
north of White River Junction, Vt. (See Geological 
Survey maps for Strafford, Vt., and Mount Cube, 
N.H.Vt.) 
Existing project. Dam is rolled-earth type with a 
dumped rock shell. It has a top length of 1,100 feet a 
top width of 30 feet, and a maximum height of 170 feet. 
Spillway is about 350 feet from right end of dam and is 
chute type with a low, curved 400-foot long concrete 
weir. Approach channel and discharge chute are 1,000 
and 1,130 feet long, respectively. Outlet works are in 
left abutment and consist of a 1,236-foot-long 13-footdiameter 
tunnel through rock. Outlet works are 
controlled by two 7-foot 6-inch by 12-foot broome gates 
mechanically operated through a shaft from a 
gatehouse above. Reservoir is operated for flood control 
purposes and has a storage capacity of 38,000 acre-feet, 
which is equivalent to 5.7 inches of runoff from its 
drainage area of 126 square miles. Estimated cost of 
project is $3,301,700 for construction and $908,300 for 
lands and damages, a total of $4,210,000. Total 
includes an estimated $i00,000 as local share of 
additional recreation facilities to be constructed. 
Project is a unit of comprehensive plan for floodcontrol 
and other purposes in Connecticut River Basin. (See 
Table 1-B at end of chapter for Acts authorizing 
existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must also bear 50 percent of 
future recreation development in accordance with 
1965 Federal Water Project Recreation Act. 
Operations and results during fiscal year. Maintenance: 
Contracts for repairs to gatehouse roof and 
modifications to traveling crane hoist completed. 
Condition at end of fiscal year. Project is complete except 
for construction of recreation facilities. Construction of 
dam was initiated in March 1947 and completed in 
June 1950. 
47V. WHITE RIVER, HARTFORD, VT. 
Location. Local flood protection for the developed 
area of Hartford and village of White River Junction, 
Vermont, is on White River at confluence with 
Connecticut River in east central part of Vermont. 
(See Geological Survey Map for Hanover, Vermont- 
New Hampshire). 
Existing project. Remove rock sills in three distinct 
areas 300 feet, 200 feet and 2,000 feet upstream from 
the Hartford Bridge; rock excavation of boulders 
downstream from Hartford Bridge for a distance of 1, 
000 feet; excavation of an earth shore protection 
located 400 feet downstream from the Hartford Bridge; 
channel excavation of sand and gravel deposits in 
vicinity of Hartford Bridge; rock excavation in channel 
just upstream of Interstate 91 highway bridge; ahd 
channel excavation of sandanrid gravel deposition 
located just downstream from the U.S. Route 4 and 5 
highway bridge and further downstream at the 
confluence of the White and Connecticut Rivers. 
Latest approved cost estimate for new work is $334,000. 
(See Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Local interests are required to 
provide without cost to United States all lands, 
easements, rights-of-way and utility relocation 
necessary for project; maintain and operate all works 
after project completion; and prevent further 
encroachment in the natural flood plain of the stream. 
Section 205 of Public Law 87-874 applies. 
Operations and results during fiscal year. New work: 
Design work was completed and a construction 
contract was awarded inJune 1970. 
Condition at end offiscal year. Construction of channel 
improvement work scheduled to begin in July 1970. 
48. FOX POINT BARRIE, 
NARRAGANSETT BAY, R. 
Location. On Providence River at Fox Points in city of 
Providence, R.I. (See Geological Survey map for 
Providence, R.I.) 
Existing project. A concrete hurricane barrier across 
Providence River and earth-dike land sections to high 
ground at east and west ends. Barrier is 700 feet long 
and dikes total 2,200 feet. Concrete river section 
includes a pumping station, a river sluice gate and 
barrier structure, and tie walls to dikes. Pumping 
32

NEW ENGLAND DIVISION 
station has five pumps capable of discharging upstream 
storm flow when river gates are closed. River sluice gate 
has three 40- by 40-foot tainter gates. Gate passage is 
capable of discharging maximum floodflow from 
behind barrier. A canal formed by a timber panel wall 
was constructed to provide continuance of cooling 
water to upstream powerplants. City streets passing 
through dikes were gated for closure at times of 
hurricane flooding. Latest approved cost estimate for 
new work is $14,711,000 for construction and $1,134, 
000 for lands and rights-of-way, a total of $15,845,000. 
Total cost includes local costs for all lands and a $3,621, 
000 cash contribution for construction. (See Table 1-B 
at end of chapter for Act authorizing existing project.) 
Local cooperation. Local interests must hold the United 
States free from damages, maintain and operate 
improvement after completion, and contribute in cash 
30 percent of total cost, including lands, easements, and 
relocations. Total estimated costs for all requirements 
of local cooperation are $4,753,400. 
Operations and results during fiscalyear. New work: Final 
audit completed resulting in final project cost of $15, 
844,543 including local cooperation requirements of 
$4,753,400. 
Condition at end of fiscal year. Project is complete. 
Barrier contract was initiated in July 1961 and 
completed in January 1966. 
49. HOUSATONIC RIVER BASIN, CONN. 
Authorized improvements in Housatonic River 
Basin are comprised of seven flood control reservoirs on 
tributaries of the Naugatuck River, principal tributary 
of Housatonic River, and three local protection 
projects, two of which are along Naugatuck River and 
one on Still River. Naugatuck and Housatonic Rivers 
converge 12 miles above mouth of Housatonic River. 
(See Table 1-B at end of chapter for Acts authorizing 
existing project; also Table 1-K on dams and reservoirs 
and local protection project for Housatonic River 
Basin.) 
49A. ANSONIA-DERBY, CONN. 
Location. On Naugatuck River in cities of Ansonia 
and Derby, Conn., about 2 miles upstream from 
confluence of Naugatuck and Housatonic Rivers. (See 
Geological Survey map for Ansonia, Conn.) 
Existing project. Construction of about 7,600 feet of 
dikes, 7,500 feet of floodwalls, and 5,700 feet of channel 
improvement along the Naugatuck River. Four 
pumping stations with total capacity of 183,900 gallons 
per minute would be constructed to discharge interior 
drainage. Other appurtenant structures would consist 
of 4 railroad and 5 street swing gates. Protection would 
also be provided along Beaver Brook tributary 
consisting of 1,800 feet of dikes, 1,900 feet of channel 
improvement, and 1,030 feet of 8- by 14.5-foot 
reinforced concrete conduit. Dikes would be rolledearthfill 
with rock slope protection on river side and 
seeded topsoil on tops and landside slopes. Height of 
dikes varies from 10 to 30 feet. Floodwalls would be 
reinforced concrete with height varying from 10 to 30 
feet. Width of channel improvement ranges from 130 
feet for a length of 1,600 feet to 230 feet for a length of 
4,100 feet along Naugatuck River, and is 10 feet along 
Beaver Brook. Latest approved cost estimate is $18,000, 
000 for construction and $1,050,000 for lands, 
damages, and relocations, a total of $19,050,000 for 
new work. This total includes local costs of $1,050,000 
for lands and relocations. (See Table 1-B at end of 
chapter for Act authorizing existing project.) 
Local cooperation. Fully complied with. Local interests 
must provide lands and rights-of-way for construction, 
including relocations; hold the United States free from 
damages; maintain and operate all works; prevent 
encroachment on improved channels and ponding 
areas and provide effective storage or pumping 
capacity if impaired. Estimated costs to local interests 
are $650,000 for lands and $400,000 for relocations. 
Operation and results during fiscalyear. New work: Multicomponent 
contract for construction of this local 
protection project was continued and is 45 percent 
complete. Contractor earnings were $5,080,000. 
Condition at end of fiscal year. Project is under 
construction and is 45 percent complete. 
49B. BLACK ROCK LAKE, CONN. 
Location. Damsite is on Branch Brook about 2 miles 
upstream from its confluence with Naugatuck River in 
towns of Thomaston and Watertown, Conn. (See 
Geological Survey map for Thomaston, Conn.) 
Existing project. Construction of a rolled-earthfill dam 
933 feet long and a maximum height of 154 feet above 
streambed. An uncontrolled chute spillway 140 feet 
long will be in right abutment. A 4- by 5-foot reinforced 
concrete conduit constructed in rock along right bank 
will provide control by means of two 3- by 4-foot 
hydraulically operated gates. Reservoir will be about 
1.8 miles long and provide storage capacity of 8,700 
acre-feet, including 270 acre-feet for recreation pool, 
equivalent to 8 inches of runoff from its tributary 
drainage area of 20.4 square miles. Construction of 
project requires relocating 1.9 miles of State road and 
relocation of a 36-inch local water supply line and 
appurtenant structures. Latest approved cost estimate 
for new work is $5,279,000 for construction and $2,931, 
000 for lands and damages, including roads and 
utilities relocation, a total of $8,210,000. (See Table 1- 
B at end of chapter for Act authorizing existing 
project.) 
Local Cooperation. Section 2, Flood Control Act of 1938 
applies. However local interests must establish 
encroachment lines downstream of dam to permit 
efficient reservoir operation. State legislation requires 
establishment of such lines. 
Operations and results during fiscalyear. New work: Work 
on multicomponent continuing contract for 
33

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
construction of dam and appurtenances continued to 
98 percent completion. Contract earnings were $2,000, 
000. 
Condition at end of fiscal year. Project is under 
construction and 99 percent complete. Remaining 
work includes correction of minor deficiencies, 
installation of chain link fencing along spillway and 
cleanup items. 
49C. DANBURY, CONN. 
Location. On Still River in city of Danbury, Conn., 
about 45 miles southwest of Hartford. (See Geological 
Survey map for Danbury, Conn.) 
Existing project. Construction of 3,625 feet of 
rectangular reinforced concrete conduit and 2,695 of 
riprapped trapezoidal channel; replacement of four 
railroad bridges and two highway bridges and removal 
of a private road bridge. Approved cost estimate (1970) 
for new work is $1,480,000 for lands including 
relocations and $6,860,000 for construction, a total of 
$8,340,000. Total includes local costs of $530,000 for 
lands and $950,000 for relocations, a total of $1,480, 
000. (See Table 1-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Local interests must provide all 
lands, easements, and rights-of-way for construction, 
including lands for spoil disposal, storm water pondage 
and collector ditches together with necessary changes 
to sewage systems, highway bridges and roads, railroad 
track except railroad bridges and approaches, and 
other utilities; hold the United States free from 
damages; maintain and operate all works after 
completion in accordance with regulations prescribed 
by the Secretary of the Army; prevent encroachment 
on improved channels and on ponding areas and if 
capacity of latter is impaired, provide equally effective 
storage, pumping capacity or both. Estimated cost to 
local interests is $1,480,000. Formal assurances were 
requested 23 May 1969. 
Operations and results during fiscal year. New work: 
Advance engineering and design continued. 
Condition at end of fiscal year. Advance engineering and 
design is 60 percent complete. Remaining work consists 
of design completion, preparation of plans and 
specifications and awarding a continuing contract for 
project construction. 
49D. DERBY, CONN. 
Location. At confluence of Naugatuck and 
Housatonic Rivers in city of Derby, Conn., about 35 
miles southwest of Hartford and 12 miles north of Long 
Island Sound. (See Geological Survey map for 
Ansonia, Conn.) 
Existing project. Construction of system of earthfilled 
levees and concrete floodwalls extending about 2,050 
feet along the bank of Housatonic River and about 3, 
200 feet along Naugatuck River. System would also 
include flood gates at railroad crossings and a pumping 
station near the confluence of the two rivers to handle 
interior drainage. Dike along Naugatuck River ties 
into lower end of Ansonia-Derby project presently 
under construction. Approved cost estimate (1970) for 
new work is $580,000 for lands including relocations 
and $7,650,000 for construction, a total of $8,230,000. 
Total includes local costs of $525,000 for lands and $55, 
000 for relocations. (See Table 1-B at end of chapter for 
Act authorizing existing project.) 
Local cooperation. Local interests must provide all 
lands, easements, and rights-of-way for construction 
including land for spoil disposal, storm water pondage 
and collector ditches together with necessary changes 
to sewage systems, highway bridges and roads, railroad 
track except railroad bridges and approaches, and 
other utilities; hold the United States free from 
damages; maintain and operate all works after 
completion in accordance with regulations prescribed 
by the Secretary of the Army; prevent encroachment 
on improved channels and on ponding areas and if 
capacity of latter is impaired, provide equally effective 
storage,- pumping capacity, or both, without cost to the 
United States; and prevent encroachment within 20 
feet of the top of the west bank of Naugatuck River at 
proposed channel widening upstream from highway 
bridge at Derby. Estimated cost to local interests is 
$580,000. Formal assurances were accepted 24 
September 1968 from the City of Derby and the State 
of Connecticut. Bond referendums to finance City's 
portion have been passed. Real estate acquisitions are 
being actively pursued. 
Operations and results during fiscal year. New work: 
Advance engineering and design was completed. 
Multi-component continuing contract for construction 
of this local protection project was awarded in May 
1970. Work was initiated and is 1 percent complete. 
Condition at end of fiscal year. Project is under 
construction and is 1 percent complete. 
49E. EAST BRANCH DAM, CONN. 
Location. Dam is in city of Torrington, Conn., on East 
Branch of Naugatuck River, 3 miles above its 
confluence with West Branch. (See Geological Survey 
map for Torrington, Conn.) 
Existing project. A rolled-earthfill dam 92 feet high 
and 700 feet long with a chute spillway in right 
abutment of dam. Outlet works include a 36-inch 
diameter, ungated, concrete conduit founded on 
bedrock. Capacity of reservoir for flood control storage 
is 4,350 acre-feet, equivalent to 8.9 inches of runoff 
from controlled net drainage area of 9.25 square miles. 
Reservoir will reduce flood discharges mainly in upper 
Naugatuck River above Torrington and along reach of 
river above Thomaston Reservoir. Total cost of new 
work for completed project is $1,433,800 for 
construction and $1,290,000 for lands, rights-of- way 
and relocation of highways, a total of $2,723,900. Total 
34

NEW ENGLAND DIVISION 
cost includes local cost of $840,000 for lands. Proposed 
recreational development estimated to cost $300,000, 
including $150,000 cost to local interests. (See Table 1- 
B at end of chapter for Act authorizing existing 
project.) 
Local cooperation. Local interests must provide lands 
and rights-of-way; hold the United States free from 
damages; maintain and operate project after 
completion; and zone channel through damage areas 
to prevent further encroachments. Act also provides 
highway relocation costs shall be borne by United 
States. Fully complied with. Total costs for all 
requirements of local cooperation were $840,000. Local 
interests must also bear 50 percent of future recreation 
development in accordance with 1965 Federal Water 
Recreation Act. 
Operations and results during fiscal year. New work: 
Initial planning for future recreational development 
was begun. 
Condition at end offiscalyear. Project is complete except 
for construction of recreation facilities. Construction of 
dam and appurtenances was initiated in March 1963 
and completed in June 1964. Road relocation was 
initiated in July 1962 and completed in October 1963. 
49F. HALL MEADOW BROOK DAM, CONN. 
Location. Dam is on Hall Meadow Brook, 0.4 mile 
above its confluence with Hart Brook to form West 
Branch of Naugatuck River, in city of Torrington and 
town of Goshen, Conn. (See Geological Survey maps- 
West Torrington, Conn. and Norfolk, Conn.). 
Existing project. A rock and rolled-earthfill 
embankment on Hall Meadow Brook, about 5 miles 
above Torrington with outlet works founded on rock in 
right abutment, with a maximum height of 73 feet 
above streambed; a dike in a saddle east of dam with a 
maximum height of 47 feet; a concrete spillway 
adjacent to west abutment of dike; and a diversion 
canal with spillway from Rueban Hart Reservoir to 
Hall Meadow Brook Reservoir. Reservoir has a 
capacity of 8,620 acre-feet, including 220 acre-feet for 
recreation pool, equivalent to 9.40 inches of runoff 
from controlled net drainage area of 17.2 square miles. 
Reservoir will reduce flood discharges mainly in upper 
Naugatuck Iiver above Torrington and along reach of 
river above Thomaston Reservoir. Reservoir is a unit of 
a coordinated system of reservoirs for flood control in 
Housatonic River Basin. Total cost of new work for 
completed project is $1,841,200 for construction and 
$1,290,000 for lands, rights-of-way, and relocation of 
highways, a total of $3,131,200. Total cost includes 
local cost of $570,000 for lands. In addition, 
recreational facilities have been developed with further 
development planned. Total estimated cost of this 
development is $230,000, including $130,000 spent on 
completed facilities. Future development includes $50, 
000 contribution from local interests as cost-sharing. 
(See Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Local interests must furnish lands 
and rights of way other than highway relocations; zone 
channel through damage areas to prevent further 
encroachments; hold the United States free from 
damages; and maintain and operate project. Fully 
complied with. Total costs for all requirements of local 
cooperation were $570,000. Local interests must also 
bear 50 percent of future recreation development in 
accordance with 1965 Federal Water Project 
Recreation Act. 
Operations and results during fiscal year. New work: 
Reimbursement was made to State for settled 
construction claim. 
Condition at end of fiscal year. Project is complete except 
for construction of additional recreational facilities. 
Construction of dam and appurtenant structures was 
initiated in March 1961 and completed in June 1962. 
49G. HANCOCK BROOK LAKE, CONN. 
Location. Dam is on Hancock Brook in town of 
Plymouth, Conn., about 3.4 miles above its confluence 
with Naugatuck River. (See Geological Survey map for 
Waterbury, Conn.) 
Existing project. A rolled earthfill dam 630 feet long 
and a maximum height of 57 feet above streambed. A 
chute spillway with a concrete ogee weir, 100 feet long, 
in right abutment. Outlet works consist of an ungated, 
3- by 4-foot 6-inch reinforced concrete conduit founded 
on rock on right bank of stream. Reservoir, which is 
entirely within town of Plymouth, Conn., will extend 
up Hancock Brook about 1.5 miles and about 1.3 miles 
up Todd Hollow Brook, principal tributary of Hancock 
Brook. It will provide a flood control storage capacity 
of 4,030 acre-feet equivalent to 6.33 inches of runoff 
from tributary drainage area of 12 square miles. Latest 
approved cost estimate for new work is $1,595,000 for 
construction and $2,528,000 for lands and damages 
including relocation of roads and railroads, a total of 
$4,123,000. (See Table 1-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Section '2, Flood Control Act of 1938 
applies. However, local interests are specifically 
required to establish encroachment lines downstream 
of dam to permit efficient reservoir operation. Fully 
complied with. 
Operations and results during fiscal year. New work: 
Deficiency judgments on land parcels were processed. 
Maintenance; Ordinary operation and maintenance 
activities. 
Condition at end of fiscal year. Project is complete. 
Construction of dam and appurtenant structures was 
initiated in July 1963 and completed in August 1966. 
35

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
49H. HOP BROOK LAKE, CONN. 
Location. Damsite is on Hop Brook in city of 
Waterbury and towns of Middlebury and Naugatuck, 
Conn., about 1.4 miles upstream of confluence of 
Naugatuck River and Hop Brook. (See Geological 
Survey map for Waterbury, Conn.) 
Existing project. Construction of a rolled-earthfill dam 
about 520 feet long with a maximum height of 97 feet 
above streambed. A dike about 404 feet long with a 
maximum height of 33 feet closes a saddle in left 
abutment. A chute spillway with a broad-crested weir 
200 feet long is founded on rock 1,200 feet northeast of 
left abutment of dam. A 3- by 5-foot reinforced 
concrete conduit constructed along left bank of brook 
controls flows by means of two 3- by 4-foot 
hydraulically operated gates. Reservoir, about 1.5 
miles long, is in towns of Middlebury and Naugatuck 
and city of Waterbury, Conn., and provides storage 
capacity of 6,970 acre-feet, which includes 120 acrefoot 
recreation pool, equivalent to 8 inches of runoff 
from tributary drainage area of 16.4 square miles. 
Construction of project required relocation of 1.8 miles 
of State Route 63. Latest approved cost estimate for 
new work is $2,065,000 for construction and $3,335,000 
for lands, rights-of-way, and relocation of roads, a total 
of $5,400,000. (See Table 1-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. However local interests must establish 
encroachment lines downstream of dam to permit 
efficient reservoir operation. State legislation requires 
establishment of such lines. 
Operations and results during fiscal year. New work: 
Deficiency judgments on land acquisitions were 
processed. Maintenance: Normal operation and 
maintenance activities. 
Condition at end of fiscal year. Project is complete. 
Construction of dam and appurtenant structures was 
initiated in December 1965 and completed in 
December 1968. 
491. NORTHFIELD BROOK LAKE, CONN. 
Location. Dam is on Northfield Brook about 1.3 miles 
upstream from its confluence with Naugatuck River, in 
town of Thomaston, Conn. (See Geological Survey 
map for Thomaston, Conn.) 
Existing project. A rolled-earthfill dam, 810 feet long 
and a maximum height of 118 feet above streambed. A 
chute spillway, with an ogee weir, 72 feet long, on rock 
in left abutment of dam. Outlet works consist of an 
ungated 36-inch reinforced concrete conduit founded 
on rock on right bank of stream. Reservoir is about 1.2 
miles long, within towns of Thomaston and Litchfield, 
Conn., and will have a flood control storage capacity of 
2,432 acre-feet, equivalent to 8 inches of runoff from 
5.7 square mile drainage area. Cost for new work was 
$1,856,000 for construction and $975,000 for lands and 
damages, including roads and utility relocations, a 
total of $2,831,000. (See Table 1-B at end of chapter for 
Act authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. However, local interests must establish 
encroachment lines downstream of dam to permit 
efficient reservoir operation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance activities. 
Condition at end of fiscal year. Project is complete. 
Construction of dam and appurtenances was initiated 
in May 1963 and completed in October 1965. 
Construction of recreation facilities was initiated in 
November 1966 and completed in August 1967. 
49J. THOMASTON DAM, CONN. 
Location. On Naugatuck River about 30.4 miles 
above its junction with Housatonic River and about 1.6 
miles north of Thomaston, Conn. Reservoir extends 
upstream about 6.4 miles. (See Geological Survey map 
for Thomaston, Conn.) 
Existing project. A rolled-earthfill and rock dam 2,000 
feet long rising 142 feet above streambed and providing 
a storage capacity of 42,000 acre-feet. Spillway consists 
of an open side channel constructed in rock and a low 
concrete weir. Outlet consists of a concrete conduit. 
Control is accomplished by gates mechanically 
operated through a shaft from a house above. Drainage 
area controlled is 97 square miles. Reservoir is operated 
for flood protection of Waterbury and other 
communities downstream on Naugatuck River. Cost 
for new work was $6,380,000 for construction and $7, 
900,000 for lands and damages, including highway, 
railroad, and utility relocations, a total of $14,280,000. 
(See Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Section 3, Flood Control Act of 1944 
applies. 
Operations and results during fiscal year. Maintenance: 
Ordinary operation and maintenance activities. 
Condition at end of fiscal year. Project is complete. 
Construction of dam and appurtenant works was 
started in May 1958 and completed in November 1960. 
50. MERRIMACK RIVER BASIN, N.H. AND 
MASS. 
Works covered by comprehensive plan are on 
Merrimack River and its tributaries in New 
Hampshire and Massachusetts. Flood Control Act of 
1936 authorized construction of a system of flood 
control reservoirs in Merrimack River Basin for 
reduction of flood heights in Merrimack Valley. Flood 
Control Act of 1938 approved general comprehensive 
plan for flood control and other purposes as approved 
by Chief of Engineers pursuant to preliminary 
examinations and surveys authorized by act ofJune 22, 
1936, and modified project to provide in addition to 
36

NEW ENGLAND DIVISION 
construction of a system of flood control reservoirs, 
related flood control works which may be found 
justified by the Chief of Engineers. All operations 
pertaining to flood control in Merrimack River Basin 
are now carried on under and reported under projects 
for individual units of comprehensive plan referred to 
above. No further expenditures are contemplated 
under general project for flood control in Merrimack 
River Basin. For final cost and financial summary, see 
Annual Report for 1946. 
A comprehensive plan for development of water 
resources of the North Nashua River Basin, a principal 
tributary of the Merrimack River, was authorized by 
1966 Flood Control Act substantially in accordance 
with Senate Document 113, 89th Congress. Plan 
provides for construction of coordinated system of four 
reservoirs and three local protection projects for flood 
protection, water supply, recreation and allied 
purposes. 
The 1966 Flood Control Act also authorized 
construction of Saxonville local protection project 
substantially in accordance with Senate Document 61, 
89th Congress. (See Table 1-L at end of chapter for 
reservoirs and related flood control works included for 
construction under comprehensive plan.) 
50A. BAKER BROOK, MASS. 
Location. In Fitchburg and Lunenburg, Worcester 
County, Massachusetts about 40 miles west of Boston. 
(See Geological Survey map for Fitchburg, Mass.) 
Existing project. Channel improvement along four 
zones of Baker Brook totaling 6,700 feet in length. 
Improvement will include deepening and widening 
existing channel to a bottom width of 40 feet with stone 
slope protection; low earth dike 2,500 feet long along 
the right bank of Baker Brook; a flood gate structure; 
removal of abandoned bridge at Falulah Road and 
construction of a new bridge at Crawford Street to 
replace three existing 48-inch pipe culverts. The 
project is an integral unit of the comprehensive water 
resources development plan for the North Nashua 
River, a tributary of the Merrimack River. Latest 
approved cost estimate (1970) for new work is $280,000 
for lands including relocations and $2,110,000 for 
construction, a total of $2,390,000. Total includes local 
costs of $200,000 for lands and $80,000 for relocations, 
a total of $280,000. (See Table 1-B at end of chapter for 
Act authorizing existing project.) 
Local cooperation. Provide all lands, easements, and 
rights-of-way for construction; provide necessary 
relocations and alterations to highways, roads, and 
highway bridges; relocate all utilities and construct 
necessary interior drainage ditches; hold and save the 
United States free from damages due to construction 
works; maintain and operate all works after 
completion in accordance with regulations prescribed 
by the Secretary of the Army; and prevent 
encroachments on improved channels. Total estimated 
cost to local interests is $280,000. Formal assurances 
will be requested during final design. 
Operations and results during fiscal year. Advance 
engineering and design was continued. 
Condition at end of fiscal year. Advance engineering and 
design is continuing and is 60 percent complete. 
50B. BLACKWATER DAM, N.H. 
Location. Dam is on Blackwater River, N.H., 8.2 
miles above confluence with Contoocook River and 
118.8 miles above mouth of Merrimack River. It is in 
town of Webster, just above village of Swetts Mills, 12.5 
miles by highway northwest of Concord, N.H. (See 
Geological Survey maps for Penacook and Mount 
Kearsarge, N.H.) 
Existing project. Dam is rolled-earth type with a 
dumped rock blanket on upstream face and a 
downstream rock toe. It has a top length, including 
spillway, of 1,150 feet, a top width of 39 feet and a 
maximum height, above riverbed, of 75 feet. There are 
also two earth dikes on west side of reservoir with 
respective lengths of 420 and 1,230 feet and a respective 
maximum height of 18 and 30 feet. Spillway is 
concrete, gravity type 240 feet long and has a 160-footlong 
approach channel and a 400-foot-long discharge 
channel. Outlet works are in spillway and consist of 
three conduits, each controlled by a 3-foot 6-inch by 5- 
foot 3-inch slide gate hydraulically operated from a 
gallery within spillway. Dam and appurtenant work 
contain a 16-foot diameter penstock intake and were 
constructed to provide for future raising and inclusion 
of power at site. Reservoir is operated for flood control 
purposes and has a storage capacity of 46,000 acre-feet 
which is equivalent to 6.7 inches of runoff from its 
drainage area of 128 square miles. Estimated cost of 
project is $867,000 for construction and $553,000 for 
lands and damages, a total of $1,420,000. Total 
includes an estimated $50,000 as local share of 
additional recreation facilities to be constructed. 
Project is a unit of comprehensive plan for flood control 
and other purposes in Merrimack River Basin. (See 
Table 1-B at end of chapter for Acts authorizing 
existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must also bear 50 percent of 
future recreational development in accordance with 
1965 Water Project Recreation Act. 
Operations and results during fiscal year. Maintenance: 
Ordinary operation and maintenance activities. 
Contract to install hydrologic network equipment 
continued and is 90 percent complete. 
Condition at end offiscalyear. Project is complete except 
for construction of recreational facilities. Construction 
of dam and appurtenant works was initiated in May 
1940 and completed in November 1941. 
37

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
50C. EDWARD MACDOWELL DAM, N.H. 
Location. Dam is on Nubanusit Brook a tributary of 
Contoocook River, one-half mile upstream from village 
of West Peterborough, N.H., and 14 miles east of 
Keene, N.H. (See Geological Survey maps for 
Peterboro and Monadnock, N.H.) 
Existing project. Dam is rolled-earth type with a 
dumped rock blanket on upstream face and a 
downstream rock toe. It has a top length of 1,030 feet, a 
top width of 25 feet, and a maximum height of 67 feet. 
Outlet works in west abutment of dam consist of an 
intake structure, a 7-foot square conduit which is 275 
feet long and controlled by 3- by 7-foot slide gates 
mechanically operated through a control tower from a 
gatehouse above, and a stilling basin emptying into 
pool of Verney Mills Dam. Spillway is a low, concrete 
weir, 100 feet long, with a 1,900-foot long approach 
channel, a 3,080-foot long discharge channel, and a 2, 
540-foot long protective dike to guide spillway 
discharge. Spillway is in a natural saddle on north side 
of reservoir about 3 miles from damsite and discharges 
into Ferguson Brook. Reservoir is operated for flood 
control purposes and has a storage capacity of 12,800 
acre-feet, equivalent to 5.5 inches of runoff from its 
drainage area of 44 square miles. Completed cost of 
project is $1,708,300 for construction and $306,000 for 
lands and damages, a total of $2,014,300. Project is a 
unit of comprehensive plan for flood control and other 
purposes in Merrimack River Basin. Name "Edward 
MacDowell Dam" was adopted by section 206, Flood 
Control Act of 1950. (See Table 1-B at end of chapter 
for Act authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. Maintenance: 
Ordinary operations and maintenance activities. 
Contract to install hydrologic network completed. 
Condition at end of fiscal year. Project is complete. 
Construction of dam and appurtenant works was 
initiated in March 1948 and completed in March 1950. 
50D. FRANKLIN FALLS DAM, N.H. 
Location. Dam is on Pemigewasset River, N.H., main 
tributary of Merrimack River, and about 2.5 miles 
upstream of Franklin, N.H. (See Geological Survey 
maps for Penacook and Holderness; N.H.) 
Existing project. Dam is rolled-earth type with a 
dumped rock shell. It has a top length of 1,740 feet,a 
top width of 25 feet, and 140 feet above riverbed. 
Spillway is on rock in right abutment and is a low, 
concrete weir with a crest length of 546 feet. Spillway 
approach and discharge channels are in earth and rock 
cut and are 1,785 and 900 feet long, respectively. 
Outlet works are on right bank of river and consist of 
an intake channel 840 feet long, and two 22-foot 
horseshoe-shaped conduits each 542 feet long and each 
controlled by four broome gates operated through a 
control tower from a gatehouse above. Outlet works 
also have a stilling basin and an outlet channel with a 
length of 2,350 feet. Reservoir is operated for flood 
control purposes and has a storage capacity of 154,000 
acre-feet, equivalent to 2.9 inches of runoff from its 
drainage area of 1,000 square miles. Estimated cost of 
project is $6,330,000 for construction and $1,760,000 
for lands and damages, a total of $8,090,000. Total 
includes an estimated $70,000 as local share of 
recreation facilities to be constructed. Project is a unit 
of comprehensive plan for flood control and other 
purposes in Merrimack River Basin. (See Table 1-B at 
end of chapter for Act authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must also bear 50 percent of 
future recreational development in accordance with 
1965 Federal=Water Project Recreation Act. 
Operations and results during fiscal year. Maintenance: 
Ordinary operation and maintenance activities. 
Contract to install hydrologic network equipment 
completed. 
Condition at end offiscalyear. Project is complete except 
for construction of recreation facilities. Construction of 
dam and appurtenant works was initiated in 
November 1939 and completed in October 1943. 
50E. HOPKINTON-EVERETT LAKES, N.H. 
Location. Hopkinton Dam is on Contoocook River, 
N.H., 17.3 miles above its junction with Merrimack 
River and about one-half mile upstream from village of 
West Hopkinton. Everett Dam is on Piscataquog 
River, N.H., 16 miles above its junction with 
Merrimack .River and about 1.3 miles southeast of 
village of East Weare. Two interconnecting canals 
were provided to enable the two reservoir areas to 
function as one. (See Geological Survey maps for 
Hillsboro, N.H., and Concord, N.H.). 
Existing project. Included in overall project are 2 dams 
and spillways, 4 dikes and 2 interconnecting canals. 
The 790-foot long Hopkinton Dam on Contoocook 
River is rolled-earth construction with a maximum 
height of 76 feet. Outlet works are provided in dam. A 
spillway is in a saddle 1.8 miles east of West Hopkinton. 
Two dikes witha - total length of 9,600 feet and a 
maximum height of 77 feet are included in this portion 
of project to close reservoir saddles. Everett Dam on 
Piscataquog River is 2,000 feet long of rolled-earth 
construction with a maximum height of 115 feet and a 
concrete spillway adjacent to dam. Outlet works are 
included in constructidn. Dikes for closing reservoir 
saddles, totaling 6,400 feet 1ng and with a maximum 
height of 50 feet, are a part of this project. Reservoir 
formed by dams has a capacity of 70,800 acre-feet in 
Contoocook River Basin and 86,500 acre-feet in 
Piscataquog River Basin, a total of 157,300 acre-feet 
equivalent to 6 inches of runoff from a gross drainage 
area of 490 square miles. Two interconnecting canals, 
totaling 17,000 feet long and varying in bottom widths 
38

NEW ENGLAND DIVISION 
from 120 to 160 feet, have been constructed and are of 
sufficient capacity to cause storage areas to function as 
a single unit of a coordinated system of reservoirs for 
control of floods in Merrimack River Basin. Cost 
estimate for new work is $13,133,000 for construction 
and $8,737,000 for lands and damages, including 
relocation of roads, railroads, cemeteries, and utilities, 
a total of $21,870,000. Total includes an estimated 
$300,000 as local share of recreation facilities to be 
constructed. (See Table 1-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must also bear 50 percent of 
future recreational development in accordance with 
1965 Federal Water Project Recreation Act. 
Operations and results during fiscal year. New work: 
Contract for modifications to comfort stations was 
advertised with bid opening at end of June 1970. 
Maintenance: Ordinary operation and maintenance 
activities. Contract to install hydrologic network 
equipment completed. Boundary survey initiated. 
Condition at end of fiscal year. Project is complete except 
for construction of additional recreation facilities. 
Construction of two dams and appurtenant works was 
initiated in November 1959 and completed in 
December 1962. 
50F. NOOKAGEE LAKE, MASS. 
Location. On Phillips Brook in Westminster, 
Worcester County, the north-central section of 
Massachusetts about 45 miles west of Boston. (See 
Geological Survey map for Fitchburg, Mass.) 
Existing project. Earth-filled dam about 2,150 feet long 
with maximum height of 106 feet. A concrete side 
channel spillway with ogee weir 205 feet long will be 
located in left abutment. A concrete drop inlet 
structure with a 48-inch concrete pipe will serve as 
uncontrolled outlet to maintain the water supply pool. 
An intake tower with two 2-foot gated outlets will 
regulate water supply out-flow. A single 4-foot by 7- 
foot emergency gate will be located in the intake 
structure immediately upstream of the service gates. 
Dam and appurtenances will impound a multi-purpose 
reservoir with total storage capacity of 8,100 acre-feet 
equivalent to 13.8 inches of runoff from its drainage 
area of 11 square miles. Of total storage, 4,700 acre-feet 
would be allocated for flood control, 2,600 acre-feet for 
industrial water supply and 800 acre-feet for 
recreation. The 140 acre permanent pool will offer 
opportunity for public outdoor recreation and will 
include day-use park-type recreation containing 
facilities for swimming, picnicking and fishing. The 
reservoir would be operated as an integral part of the 
comprehensive water resources development plan for 
the North Nashua River, a tributary of the Merrimack 
River. Latest approved cost estimate (1970) for new 
work is $1,650,000 for lands including relocations and 
$6,350,000 for construction, a total of $8,000,000 Total 
includes local reimbursement of $3,160,000 for costs 
allocated to water supply and recreation. Project is 
presently being reformulated to exclude the authorized 
water supply storage and to add water quality as a 
project purpose. This is subject to post-authorization 
change approval by OMB. (See Table 1-B at end of 
chapter for Act authorizing existing project.) 
Local cooperation. Local interests are required to repay 
all the costs allocated to water supply, as determined by 
the Chief of Engineers, in accordance with the 
provisions of the Water Supply Act of 1958, as 
amended, presently estimated at $2,940,000 exclusive 
of interest; pay or repay one-half separable first costs 
allocated to recreation and fish and wildlife, presently 
estimated at $220,000 and administer, operate and 
maintain, including replacement, recreation and fish 
and wildlife lands and facilities, all in accordance with 
the Federal Water Project Recreation Act; protect 
channels downstream of the reservoirs from 
encroachments which would adversely affect operation 
of the system; hold and save the United States free from 
all damages due to water rights claims resulting from 
construction and operation of the reservoirs; and 
exercise to the full extent of their legal capability, 
control against removal of water in the basin which will 
affect the reservoir's water supply storage and the 
development of dependable stream regulations. 
Estimated cost to local interests is $3,160,000. Formal 
assurances will be requested during final design. 
Operations and results during fiscal year. Advance 
engineering and design was continued. 
Condition at end of fiscal year. Advance engineering and 
design is continuing and is 20 percent complete. 
50G. WHITMANVILLE LAKE, MASS. 
Location. On the Whitman River in Westminister, 
Worcester County, in the north-central section of 
Massachusetts about 45 miles west of Boston. (See 
Geological Survey map for Gardner, Mass.) 
Existing project. Construction of an earthfill dam, 1, 
500 feet long and a maximum height of 76 feet with a 
storage capacity of 9,350 acre-feet, of which 1,650 acrefeet 
will be utilized for industrial water supply and 6, 
700 acre-feet will be reserved for flood control. A 
concrete chute spillway with an ogee weir 200 feet long 
will be located in the left bank. An ungated 4- by 3-foot 
conduit formed integrally with the spillway serves as 
flood control outlet and maintains water supply pool. 
An intake tower with two 2- by 2-foot gated outlets 
regulates water supply outflow. A single 4- by 7-foot 
emergency gate will be located within the intake 
structure immediately upstream from service gates. 
The reservoir would be operated as an integral part of 
the comprehensive water resources development plan 
for the North Nashua River, a tributary of the 
Merrimack River. The latest approved cost estimate 
(1970) for new work is $1,790,000 for lands including 
relocations and $4,010,000 for construction, a total of 
39

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
$5,800,000. Total includes local reimbursement of $1, 
680,000 for costs allocated to water supply. However, 
project is presently being reformulated to delete the 
authorized water supply storage and to add water 
quality and recreation as project purposes. This is 
subject to post-authorization change approval by 
OMB. (See Table 1-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Local interests are required to repay 
all the.costs allocated to water supply, as determined by 
the Chief of Engineers, in accordance with the 
provisions of the Water Supply Act of 1958,i as 
amended, presently estimated at $1,680,000, exclusive 
of interest; protect channels downstream of the 
reservoir from encroachments which would adversely 
affect its operation; hold and save the United States 
free from all damages due to water rights claims 
resulting from construction and operation of the 
reservoir; and exercise to the full extent of their legal 
capability, control against removal of water in the 
basin which will affect the reservoir's water supply 
storage and the development of dependable stream 
regulations. Formal assurances will be requested 
during final design. 
Operations and results during fiscal year. New work: 
Advance engineering and design continued. 
Condition at end of fiscalyear. Advance engineering and 
design is continuing and is 45 percent complete. 
51. NEW BEDFORD, FAIRHAVEN, AND 
ACUSHNET, MASS. 
Location. Main harbor barrier is across New Bedford 
and Fairhaven Harbor in vicinity of Palmer Island. 
Supplemental dikes and walls are provided in Clark 
Cove area of New Bedford and Fairhaven. (See 
Geological Survey maps for New Bedford North, New 
Bedford South, Marion, and Sconticut Neck, Mass., 
and Coast and Geodetic Survey Charts 249, 252, and 
1210.) 
Existing project. A 4,500-foot earthfill dike, with rock 
faces and toes and a top width of 20 feet. A gated 
opening, 150 feet wide, is included in section of barrier 
between Palmer Island and Fairhaven mainland to 
accommodate navigation. Closure of navigation 
opening in barrier accomplished by sector gates with 
concrete abutments and sill founded on rock. Each gate 
has a radius of 90 feet, a central angle of 60 degrees, 
and a total height of 59 feet. Gates are opened and 
closed by means of a rack and pinion drive. Controls 
are arranged so that gates can be operated singly or 
simultaneously from either of two control houses, one 
on each abutment. Two gated conduits are constructed 
in section of barrier between New Bedford and Palmer 
Island, each consisting of two separate conduits side by 
side, each 6 feet wide by 9 feet high. These conduits will 
permit emergency emptying of pool above barrier. A 
dike extension of earthfill with rock facing runs south 
for 3,600 feet from western end of harbor barrier. 
Closure to high ground is effected by 1,000 feet of dike 
of earthfill with rock facing running westward. 
Protection in Clark Cove area consists of 5,800 feet of 
earthfill, rock-faced dike, running 2,700 feet across 
head of Clark Cove, then south along east shore of cove 
for about 2,400 feet. At west end, closure to high 
ground is accomplished by a dike constructed of 
earthfill with rock facing, 600 feet long and at east end 
by a similar dike 100 feet long. The 3,100-foot long 
Fairhaven dike is constructed of earthfill with rock 
facing. Latest approved cost estimate for new work is 
$17,980,000 for construction, and $620,000 for lands, 
right-of-way and relocations, a total of $18,600,000. 
This total includes local costs of $600,000 for lands and 
relocations and a $6,500,000 cash contribution. (See 
Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Local interests must contribute 30 
percent of first cost, including lands and rights-of-way; 
contribute capitalized value of annual maintenance 
and operation ($1,520,000) for main harbor barrier; 
hold the United States free from damages; and 
maintain and -operate improvement except main 
harbor barrier after completion. Total estimated costs 
for all requirements of local cooperation are $6,998, 
000. Assurances received and local interests are 
contributing as construction proceeds. 
Operations and results during fiscal year. New work: 
Maintenance: Ordinary operation and maintenance 
activities. Awarded and completed contract for 
repaving of road on dike. 
Condition at end of fiscal year. Construction of barrier 
and appurtenances was initiated in October 1962, and 
completed in January 1966. Construction of the 
pumping station was initiated in October 1962 and 
completed in June 1964. Remaining work on the 
project consists of installing permanent air jets on the 
barrier's sector gates. Final audit to determine cost 
sharing remains to be done after completion of all 
miscellaneous work items. 
52. NEW LONDON, CONN. 
Location. In the city of New London, Conn., about 45 
miles southeast of Hartford, Conn., and 50 miles 
southwest of Providence, R.I. (See Geological Survey 
Map for New London, Conn.) 
Existing project. Hurricane protection project consists 
principally of two barriers. Bentleys Creek barrier will 
be 2,900 feet long with 20-foot hydraulic single-leaf 
swing navigation opening. The Bentleys Creek area 
will be utilized as ponding area for interior drainage 
when navigation gate is closed. Top of barrier will be at 
22.0 feet mean sea level. Shaw Cove barrier will be 1, 
900 feet long with a 50-foot lateral rolling navigation 
opening to accommodate existing channel. A storm 
water pumping station will be located behind the 
barrier to discharge interior drainage. Top of barrier 
will be at plus 18.0 feet mean sea level. Both barriers 
40

NEW ENGLAND DIVISION 
will be rock-faced earthfill structures. A small 
earthfilled dike 140 feet long will be provided to close a 
low-lying area near Smith Street. One 50-foot street 
gate, a 30-foot railroad gate and 168 feet of reinforced 
concrete wall complete the protection plan. Latest 
approved estimate is $10,900,000 for construction and 
$700,000 for lands and damages, a total of $11,600,000 
for new work. Total includes local costs of $700,000 for 
lands and a $2,780,000 cash contribution. (See Table 
1-B at end of chapter for Act authorizing existing 
project.) 
Local cooperation. Local interests must; (a) Provide 
lands and rights-of-way for construction; (b) make 
alterations and relocations; (c) bear 30 percent of 
construction cost with credit allowed for (a) and (b); 
(d) hold the United States free from damages; and (e) 
maintain and operate all works. Estimated costs to 
local interests are $700,000 for lands and relocations 
and a cash contribution of $2,780,000, a total of $3,480, 
000. Assurances will be requested during final design. 
Operations and results during fiscal year. New work: 
Advance engineering and design continued. Urban 
renewal plans including a two-lane highway and 
bridge are being incorporated along the Shaw Cove 
Barrier. 
Condition at end of fiscal year. Advance engineering and 
design is approximately 70 percent complete. 
Remaining work consists of completing design and 
awarding a multicomponent continuing contract for 
project construction, to be accomplished in two 
segments; Bentleys Creek and Shaw Cove. 
53. STAMFORD, CONN. 
Location. In Fairfield County on north shore of Long 
Island Sound, about 30 miles east of New York City 
and 20 miles southwest of Bridgeport, Conn. (See 
Geological Survey map for Stamford, Conn.) 
Existing project. This hurricane protection project 
consists principally of three structures; East Branch 
barrier consists of 2,850 feet of earthfilled dike, with 
rock faces and toes. It extends across East Branch at a 
point about 1,000 feet above its mouth-about 900 feet 
north of Ware Island. Barrier has a top elevation of 17 
feet above mean sea level, a top width of 20 feet, and a 
gated opening, 90 feet wide where the barrier crosses 
existing navigation channel. A 45,000 gallons per 
minute pumping station is in navigation gate structure 
to prevent excessive ponding during flood stages. West 
Branch protection on east bank of West Branch consists 
of 1,340 feet of concrete wall, 160 feet of sheet pile 
bulkhead wall, and 2,950 feet of earthfilled dike. Dike 
is constructed with rock facing on top and seaward 
slope and either rock or seeded topsoil on landward 
slope. Walls forming northern or upper half of 
protection have a top elevation 17 feet above mean sea 
level, and a top width of 10 feet. Appurtenant 
structures include a 229,500 gallons per minute 
pumping station to handle storm runoff and discharge 
of cooling water during periods of gate closure. 
Westcott Cove protection consists of 4,400 feet of 
earthfilled dike with rock facing on top and seaward 
slopes and seeded topsoil on landward slopes and two 
pumping stations with total capacity of 85,500 gallons 
per minute. Latest approved estimate for new work is 
$9,820,000 for construction, and $1,880,000 for lands 
and damages and relocations, a total of $11,700,000. 
Total includes local costs of $1,183,000 for lands and 
damages and a cash contribution of $3,207,000. (See 
Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Local interests will provide lands, 
easements, and rights-of-way; make modifications to 
existing storm drainage system which may be required 
to obtain full benefits of protection plan, all necessary 
modifications to existing sanitary sewer facilities 
required to prevent entry of tidal-waters, and all 
changes, alterations and additions to or relocations of 
any buildings and utilities made necessary by 
construction of project; bear 30 percent of total first 
cost, estimated at $3,510,000 and consisting of cost of 
items listed above plus a cash contribution estimated at 
$2,327,000 contribute in cash, in lieu of cost of annual 
maintenance and operation of tidal portion of East 
Branch barrier which is to be operated and maintained 
by the United States, an amount presently estimated at 
$880,000; maintain and operate all works after 
completion with exception of tidal portion of East 
Branch barrier and aids to navigation; and hold the 
United States free from damages. Assurances received 
and cash contributions have been deposited. 
Operations and results during fiscal year. New work: 
Project completed. Maintenance: Ordinary operation 
and maintenance activities. 
Condition at end of fiscal year. Project is complete. 
Construction of project initiated in May 1965 and was 
completed in January 1969. Final audit will determine 
cost sharing. 
54. STRATFORD, CONN. 
Location. In town of Stratford, Fairfield County, 
Conn., on north shore of Long Island Sound about 50 
miles northeast of New York City and 13 miles 
southwest of New Haven. (See Geological Survey maps 
for Bridgeport and Milford, Conn.) 
Existing project. Hurricane protection project provides 
for about 3 miles of earthfilled levees around the Great 
Meadows area of town and a system of earthfilled 
levees and concrete floodwalls about 2.5 miles long 
along the west bank of the Housatonic River and the 
shoreline of Long Island Sound north of Stratford 
Point. Appurtenant structures would include a conduit 
structure in the barrier crossing Lewis Gut to permit 
continued flow of the Gut through the barrier during 
normal periods, ramps to bring roadway elevations up 
to desired protection grade at dike crossings of existing 
roadways and five pumping stations to discharge 
41

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
sewage effluent and interior drainage during flood 
periods. Approved cost estimate (1970) for new work is 
$2,380,000 for lands including relocations and $15,620, 
000 for construction, a total of $18,000,000. Total 
includes local costs of $2,100,000 for lands, $280,000 for 
relocations and a cash contribution of $3,020,000. (See 
Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Local interests must provide lands, 
easements and rights-of-way for construction and 
operation of project; make all changes, alterations and 
relocations of buildings, highways and utilities, and 
modifications to sewerage and drainage facilities made 
necessary by construction of the project; bear 30 
percent of total first cost of project with credit allowed 
for value of lands and relocations; hold United States 
free from damages due to construction works; maintain 
and operate all works after completion and prevent any 
encroachment on ponding areas which would decrease 
the effectiveness of the improvements, and, if impaired, 
provide substitute storage capacity or equivalent 
pumping capacity. Total estimated cost to local 
interests is $5,400,000. Formal assurances will be 
requested during final design. 
Operations and results during fiscal year. New Work: 
Advance engineering and design continued. 
Condition at end of fiscal year. Advance engineering and 
design is about 50 percent complete. 
55. THAMES RIVER BASIN, CONN., R.I., 
AND MASS. 
Works covered by this plan are a series of dams and 
reservoirs on tributaries of Thames River in 
Massachusetts and Connecticut, within a radius of 45 
miles from Norwich, Conn., and a channel 
enlargement on Shetucket River where it discharges 
into Thames River at Norwich. Flood Control Act of 
August 18, 1941, approved plan for a system of 
reservoirs and channel improvements in Thames River 
Basin in accordance with House Document 885, 76th 
Congress, 3d session, and authorized $6 million for 
initiation and partial accomplishment of project. Flood 
Control Act of December 22, 1944, authorized 
completion of approved plan. Flood Control Act of 
July 14, 1960, authorized project for West Thompson 
Reservoir, substantially as recommended in Senate 
Document 41, 86th Congress, 2d session. (See Table 1- 
M at end of chapter on reservoirs and local protection 
districts, Thames River Basin, for projects comprising 
approved plan.) 
55A. BUFFUMVILLE LAKE, MASS. 
Location. Dam is on Little River, 1.3 miles above its 
junction with French River and 8 miles northeast of 
Southbridge, Mass. Reservoir extends upstream about 
1.7 miles northerly and 1.9 miles southerly. (See 
Geological Survey maps-Webster, Mass. and Conn., 
and Leicester, Mass.) 
Existing project. Dam is rolled-earth type with rockfill 
slope protection. It has a top length of 3,255 feet, a top 
width of 20 feet and a maximum height of 66 feet above 
streambed. A combined spillway and outlet founded on 
firm bedrock is in the right, or south abutment. 
Spillway is concrete overflow type, having a crest 
length of 220 feet and a peak discharge capacity of 29, 
800 cubic feet per second. Outlet consists of three 3- by 
4.5 -foot conduits provided with sluice gates. Gates are 
electrically operated from control house on right 
abutment. An earth dike 610 feet long is at south end of 
reservoir, 2.75 miles from spillway. Reservoir capacity 
totals 12,700 acre-feet (11,300 acre-feet for flood 
control purposes and 1,400 acre-feet permanent 
storage), equivalent to 9 inches of runoff from its 
drainage area of 26.5 square miles. Estimated cost of 
project is $2,359,000 for construction and $841,000 for 
lands and damages including highway relocations, a 
total of $3,200,000. Total includes an estimated $100, 
000 as local share of additional recreation facilities to 
be constructed. Project is a unit of comprehensive plan 
for flood control and other purposes in Thames River 
Basin. (See Table 1-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must also bear 50 percent of 
future recreational development in accordance with 
1965 Federal Water Project Recreation Act. 
Operations and results during fiscal year. Maintenance: 
ordinary operation and maintenance. 
Condition at end of fiscal year. Project is complete except 
for construction of additional recreation facilities. 
Construction of dam and appurtenant works was 
initiated in September 1956 and completed in June 
1958. 
55B. EAST BRIMFIELD LAKE, MASS. 
Location. Dam is on Quinebaug River, 64.5 miles 
above its confluence with Shetucket River and 1 mile 
southwest of village of Fiskdale, Mass. (See Geological 
Survey maps-Whales, Mass., and Conn., Southbridge, 
Mass. and Conn., East Brookfield, Mass., and Warren, 
Mass.) 
Existing project. A rolled-earthfill dam 520 feet long, 
55 feet above streambed. Dam provides a flood control 
storage capacity of 28,800 acre-feet and an operational 
storage capacity of 1,200 acre-feet, a total of 30,000 
acre-feet, equivalent to 8.3 inches of runoff from its 
controlled drainage area of 67.5 square miles. Chutetype 
spillway with a crest length of 75 feet is in the 
right, or south abutment. Outlet works consist of 
intake, with stoplog facilities, gate structure with two 6- 
foot 3-inch by 11-foot gates and controls; a 10-foot 6- 
inch horseshoe-shaped conduit, about 230 feet long; a 
stilling basin and service bridge. Reservoir is operated 
as a unit of a coordinated system of reservoirs for 
control of floods in Thames River Basin. Latest cost 
estimate for new work is $1,590,000 for construction 
42

NEW ENGLAND DIVISION 
and $5,720,000 for lands and damages including 
highway relocations, a total of $7,310,000. Total 
includes an estimated $200,000 as local share of 
additional recreation facilities to be constructed. (See 
Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must also bear 50 percent of 
future recreational development in accordance with 
1965 Federal Water Project Recreation Act. 
Operations and results during fiscal year. New work: 
Contract for sanitary facilities and water distribution 
system was awarded in June 1970. Maintenance: 
Ordinary operation and maintenance activities. 
Condition at end offiscalyear. Project is complete except 
for construction of additional recreation facilities. 
Construction of dam and appurtenant works was 
initiated in May 1958 and completed in June 1960. 
55C. HODGES VILLAGE DAM, MASS. 
Location. Dam is on French River, 15 miles above its 
confluence with Quinebaug River, at Hodges Village 
in town of Oxford, Mass., about 5 miles north of 
Webster, Mass. (See Geological Survey maps for 
Webster, Mass., and Conn., Leicester, Mass., 
Worcester South, Mass., and Oxford, Mass.) 
Existing project. A rolled-earthfill dam 2,140 feet long, 
55 feet above streambed, with a concrete overflow 
section. Dam provides a flood control storage capacity 
of 12,800 acre-feet. Drainage area controlled is 31 
square miles. Reservoir, at spillway crest elevation 501, 
extends about 3 miles upstream and lies entirely in 
town of Oxford, Mass. Included in project are four 
earth dikes necessary for closing saddles in reservoir 
perimeter. The four dikes have a total length of 2,600 
feet and maximum height of 35 feet. Reservoir is 
operated as a unit of a coordinated system of reservoirs 
for flood control in Thames River Basin. Latest cost 
estimate for new work is $1,277,000 for construction 
and $3,144,000 for lands and damages including 
highway, railroad, and utility relocation, a total of $4, 
421,000. (See Table 1-B at end of chapter for Act 
authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. Maintenance: 
Ordinary operation and maintenance activities. 
Condition at end of fiscal year. Project is complete. 
Construction of dam and appurtenant works, initiated 
in March 1958, was completed in December 1959. 
55D. MANSFIELD HOLLOW LAKE, CONN. 
Location. Dam is at Mansfield Hollow, Conn., on 
Natchaug River, 5.3 miles above its confluence with 
Willimantic River. It is 4 miles northeast of city of 
Willimantic, Conn. (See Geological Survey maps for 
Spring Hill and Willimantic, Conn.) 
Existing project. Dam is rolled-earth type with a 
dumped rock blanket on upstream face. It has a top 
length, including spillway, of 12,422 feet, a top width of 
15 feet, and a maximum height of 70 feet. There are 
also five earth dikes north of dam and one earth dike 
south of dam having a respective length of 190, 830, 
464, 257, 766, and 104 feet and a respective maximum 
height of 12, 55, 15, 11, 8, and 12 feet. Spillway is in 
river channel and is concrete, gravity type with a crest 
length of 690 feet. Outlet works are in spillway and 
consist of five conduits, each controlled by a 5-foot 6- 
inch by 7-foot slide gate hydraulically operated from a 
gallery within spillway. Reservoir is operated for flood 
control purposes and has a storage capacity of 52,000 
acre-feet which is equivalent to 6.1 inches of runoff 
from its drainage area of 159 square miles. Estimated 
cost for project is $4,210,000 for construction and $2, 
340,000 for lands and damages, a total of $6,550,000. 
Total includes an estimated $50,000 as local share of 
additional recreation facilities to be constructed. 
Project is a unit of comprehensive plan for flood control 
and other purposes in Thames River Basin. (See Table 
1-B at end of chapter for Act authorizing existing 
project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must also bear 50 percent of 
future recreational development in accordance with 
1965 Federal Water Project Recreation Act. 
Operations and results during fiscal year. Maintenance: 
Ordinary operation and maintenance activities. 
Condition at end of fiscal year. Project is complete except 
for construction of additional recreation facilities. 
Construction of dam, initiated in 1949, was completed 
in May 1952. 
55E. WEST THOMPSON LAKE, CONN. 
Location. Dam is on Quinebaug River in town of 
Thompson, Conn. Site is in village of West Thompson, 
2 miles upstream from city of Putnam, Conn. (See 
Geological Survey map, Putman, Conn.) 
Existing project. Dam is a rolled-earthfill structure 2, 
550 feet long with maximum height of 70 feet above 
streambed. A side channel spillway with a 320-foot Lshaped 
concrete weir is in right abutment. A 600-foot 
long dike with a maximum height of 19 feet is northeast 
of dam. Reservoir overflows will discharge through a 
side channel spillway in the west (right) abutment. 
Dam impounds a reservoir 6.3 miles long with a surface 
area of 1,250 acres. Reservoir provides a flood control 
storage capacity of 25,600 acre-feet, equivalent to 6.5 
inches of runoff from its net drainage area of 74 square 
miles, below Westville and East Brimfield Reservoirs. 
In addition, a 200 acre permanent pool with storage 
capacity of 1,200 acre-feet is provided for recreational 
activity. Latest approved cost estimate for new work is 
$5,010,000 for construction and $1,860,000 for lands, 
damages and road relocations, a total of $6,870,000. 
43

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
(See Table 1-B at end of chapter for Act authorizing 
existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. New Work: 
Miscellaneous land acquisition continued. 
Maintenance: Ordinary operation and maintenance 
activities. 
Condition at end of fiscal year. Construction of dam, road 
relocations, and appurtenances was initiated in August 
1963 and completed in October 1965. Additional land 
acquisition and construction of recreation facilities 
remain to complete the project. 
55F. WESTVILLE LAKE, MASS. 
Location. Dam is on Quinebaug River, 56.7 miles 
above its confluence with Shetucket River, in towns of 
Sturbridge and Southbridge, Mass., and 1.3 miles west 
of center of Southbridge. (See Geological Survey maps- 
Southbridge, Mass. and R.I., and East Brookfield, 
Mass.) 
Existing project. A rolled-earthfill dam across main 
river channel, with a maximum height of 78 feet above 
streambed. Concrete spillway section is on north 
abutment. Reservoir has a flood control storage 
capacity of 11,000 acre-feet, equivalent to 6.5 inches of 
runoff from controlled net drainage area of 32 square 
miles. Reservoir is operated as a unit of coordinated 
system of reservoirs for flood control in Thames River 
Basin. Estimated cost of new work is $2,290,000 for 
construction, and $3,400,000 for lands and damages 
(including relocation of highways, utilities, cemeteries, 
and structures), a total of $5,690,000. (See Table 1-B at 
end of chapter for Act authorizing existing project.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. Maintenance: 
Ordinary operation and maintenance activities. 
Contract for boundary survey continued and nearly 
complete. 
Condition at end of fiscal year. All new work is complete 
except construction of recreational facilities. 
Construction of dam and appurtenant works was 
initiated in April 1960 and completed in August 1962. 
56. TRUMBULL POND LAKE, CONN. 
Location. On the Pequonnock River in the town of 
Trumbull, Fairfield County, in southwestern 
Connecticut about 4 miles north of Bridgeport. (See 
Geological Survey Map for Long Hill, Connecticut.) 
Existing project. Concrete gravity dam about 915 feet 
long with maximum height of 129 feet. A chute 
spillway will be incorporated in the eastern end of the 
structure. Dam will impound a multiple-purpose 
reservoir with total storage of 13,850 acre-feet. Of total 
storage capacity, 6,080 acre-feet equivalent to 8 inches 
of runoff from its drainage area of 14 square miles will 
be allocated to flood control, 5,850 acre-feet for water 
supply, 1,350 acre-feet for low flow augmentation and 
510 acre-feet dead storage. Latest approved cost 
estimate (1970) for new work is $2,270,000 for lands 
including relocations and $8,030,000 for construction, 
a total of $10,300,000. Lack of suitable earthfill 
material within reasonable distance of the site 
necessitated change from rolled earthfill to concrete 
gravity dam for more economical design. (See Table 1- 
B at end of chapter for Act authorizing existing 
project.) 
Local cooperation. Local interests are required to repay 
all the costs allocated to water supply, as determined by 
the Chief of Engineers, in accordance with the 
provisions of the Water Supply Act of 1958, as 
amended, presently estimated at $5,050,000 exclusive 
of interest; pay or repay one-half separable first costs 
allocated to recreation and fish and wildlife presently 
estimated at $80,000, and administer, operate and 
maintain, including replacement, recreation and fish 
and wildlife lands and facilities, all in accordance with 
the Federal Water Project Recreation Act; protect 
channels downstream of the reservoirs from 
encroachments which would adversely affect operation 
of the system; at least annually notify interests affected 
that project will not provide complete flood protection; 
hold and save the United States free from all damages 
due to water rights claims resulting from construction 
and operation; and exercise to the full extent of their 
legal capability, control against removal of streamflow 
made available by reservoir storage for low-flow 
augmentation. Estimated cost to local interests is $5, 
130,000. Formal assurances will be requested during 
final design. 
Operations and results during fiscal year. Advance 
engineering and design was continued. 
Condition at end of fiscal year. Advance engineering and 
design is 70 percent complete. 
57. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
In accordance with provisions of Flood Control Act 
of 1936, as amended, local flood protection works 
constructed with Federal funds are transferred to local 
interests to operate and maintain. To insure 
compliance with regulations prescribed for their 
operation and maintenance regular inspections of the 
following projects were made during the fiscal year; 
Connecticut; November 1969 and June 1970-East Branch 
Dam, Hall Meadow Brook Dam, Mad River Lake, 
Norwich, Norwalk, Stonington, Torrington, 
Waterbury-Watertown and Winsted; December 1969 
and June 1970-East Hartford and Hartford; June 
1970-Stamford. Maine; October 1969 and June 1970- 
Cherryfield Massachusetts October 1969 andJune 1970- 
Fitchburg, Gardner, Haverhill, Northampton; 
November 1969 and May-June 1970-Canton, 
Chicopee, Three Rivers, Ware, West Warren and 
44

NEW ENGLAND DIVISION 
Worcester; December 1969 and May-June 1970- 
Chicopee Falls, Springfield and West Springfield; 
November 1969-Holyoke. New Hampshire; October 
1969 and May-June 1970Framington, Keene, Lincoln 
and Nashua. Rhode Island; November 1969 and June 
1970-Woonsocket (Lower and Upper). Vermont; 
October 1969 and May 1970-Weston. 
58. FLOOD CONTROL RESERVOIR 
OPERATIONS 
A coordinated system of reservoirs, many of which 
are multi- purpose in nature and all containing 
significant amounts of storage for flood control 
purposes, has been established in five major flood 
producing basins in New England. During periods of 
flood flows, regulation of reservoirs is fully coordinated 
within each basin dependent upon its location in the 
watershed, its available storage capacity and origin of 
flood. In addition to flood control releases, water 
supply and flow augmentation releases were made 
from selected reservoirs. Regulation within each basin 
during the fiscal year was as follows; 
Blackstone River Basin The West Hill reservoir was 
regulated in December 1969, February and April 1970 
and flood storage used ranged from 10 to 18 percent. 
Connecticut River Basin In August 1969 Colebrook 
River, Sucker Brook and Mad River reservoirs were 
operated, resulting in storage used from 8 to 18 percent. 
During November-December 1969, Ball Mountain, 
Townshend, Tully and Colebrook reservoirs utilized 
storage from 8 to 16 percent. In February 1970, 
Townshend, Otter Brook, Birch Hill, Conant Brook, 
Knightville and Littleville reservoirs utilized storage 
ranging from 7-12 percent. During April 1970, all 
reservoirs were operated and stored various amounts 
ranging from a minimum of 3 percent at Union Village 
to a maximum of 20 percent at Ball Mountain. During 
May 1970, Otter Brook, Knightville and Colebrook 
River were regulated with 8 to 15 percent of storage 
used. In addition, releases for white water canoeing 
occurred at Ball Mountain during October and May. 
Water supply and fishery releases were discharged 
from Colebrook River. 
Housatonic River Basin Thomaston was regulated in 
August 1969 and April 1970 and storages used ranged 
from 16 to 18 percent. During February and April 
1970, Hop Brook reservoir stored floodwaters and 
utilized storage up to 18 percent. In August 1969 Black 
Rock reservoir (still under construction) filled to about 
10 percent. The other 4 reservoirs, which are ungated, 
operated automatically and stored waters during 
August 1969, February 1970 and April 1970, using up 
to 18 percent of available reservoir storage. 
Merrimack River Basin In July 1969 Franklin Falls 
dam was operated and 11 percent of storage capacity 
was utilized. All reservoirs except Franklin Falls stored 
floodwaters in February 1970, varying from 6 percent 
of capacity at Everett to 36 percent at MacDowell. In 
451-584 0-72-4 
April Franklin Falls stored 8 percent and Hopkinton 
11 percent. 
Thames River Basin All six reservoirs were operated in 
February and April 1970 with storage utilized ranging 
from 15 percent at Buffumville to 42 percent at West 
Thompson. In addition, releases were made from East 
Brimfield during the summer months to augment low 
flows. 
59. HURRICANE BARRIER OPERATIONS 
Four hurricane barriers, located along the southern 
coast of New England, protect coastal communities 
from tidal flooding associated with hurricanes or severe 
coastal storms. The Corps operates the Stamford, 
Conn. and New Bedford-Fairhaven, Mass. barriers 
since navigation is involved. The Fox Point, R.I. and 
Pawcatuck, Conn. barriers are operated by the local 
communities. A brief resume of operations follows; 
Stamford Barrier The barrier gate was closed on 11 
occasions, all due to coastal storms. The maximum 
ocean tide rose to 7.8 feet msl. 
New Bedford-Fairhaven Barrier The barrier gates were 
closed on 5 occasions, all due to coastal storms. The 
maximum ocean tide rose to 5.0 feet msl. 
Fox Point and Pawcatuck Barriers Neither of these 
barriers were operated during the fiscal year. 
60. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 1-N at end of chapter.) 
61. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION Flood control 
activities pursuant to section 205, Public Law 858, 80th 
Congress, as amended (preauthorization) 
(See table at end of chapter.) 
EMERGENCY FLOOD CONTROL 
ACTIVITIES-REPAIR, FLOOD FIGHTING, 
AND RESCUE WORK PUBLIC LAW 99, 84 TH 
CONG,, AND ANTECEDENT LEGISLATION 
Federal costs for fiscal year were $28,620 for advance 
preparation of flood control and coastal emergencies, 
$215,100 for emergency operations and $20,558 for 
rehabilitation work on the Blackstone River at 
Blackstone, Mass. 
GENERAL INVESTIGATIONS 
62. SURVEYS 
Fiscal year costs for surveys from regular funds were 
$918,189 of which $223,061 was for navigation surveys; 
$347,855 for flood control surveys; $20,880 for beach 
erosion surveys; $38,295 for coordination surveys; and 
$288,098 for comprehensive basin surveys. 
5

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
63. COLLECTION AND STUDY OF BASIC 
DATA 
The Division Engineer is the U.S. representative on 
Saint John and Saint Croix River Engineering 
Committee. He is also U.S. member on Saint Croix 
River Board of Control. Annual inspections are made 
of conditions on these two rivers and a continuing 
program of compilation of basic hydrologic 
information is carried out. Division Engineer's 
representatives during past year kept closely in touch 
with developments in the two basins and cooperated 
with their Canadian counterparts assisting in 
development of basins' resources. Total costs for fiscal 
year were $3,002. Total costs to June 30, 1970 were 
$20,649. 
Flood plain studies comprise compilation and 
dissemination, upon responsible local request, of 
information on floods and potential flood damages, 
including identification of areas subject to inundation 
by floods of various magnitudes and frequencies, and 
general criteria for guidance in use of flood plain areas; 
and engineering advice to local interests for their use in 
planning to ameliorate flood hazard. Total costs for 
fiscal year were $143,431. Total costs to June 30, 1970, 
were $879,663. (See Table 1-P at end of chapter for 
completed flood plain studies.) 
46

NEW ENGLAND DIVISION 
TABLE 1-A COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
1. Andrews River, Mass. New Work 
(Regular Funds) Approp. $ 125,000 $ 5,000 $ - $ - $ 156,901 
Cost 19,149 106,794 5,123 786 155,512 
Maint. 
Approp. 
Cost 
(Contributed Funds) New Work 
Contrib. 
Cost 
2. Boston Harbor, Mass. New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
3. Cape Cod Canal, Mass. New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor rehab. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
4. Chatham Stage Harbor, New Work 
Mass. Approp. 
Cost 
Maint. 
Approp. 
Cost 
5. Cohasset Harbor, New Work 
Mass. Approp. 
(Regular Funds) Cost 
Maint. 
Approp. 
Cost 
(Contributed Funds) New Work 
Contrib. 
Cost 
6. Connecticut River New Work 
below Hartford, Approp. 
Conn. Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
7. Fall River Harbor, New Work 
Mass. Approp. 
Cost 
Maint. 
Approp. 
Cost 
347 
347 
166,000 
21,240 
-145,000 
38,627 
851,636 
516,321 
1,144,000 
1,005,306 
108,964 
638,013 
621,034 
1,071,563 
1,233,665 
1,063 
4,934 
11,000 
5,947 
105,000 
11,398 
16,668 
2,004 
-3,083 
185,381 
5,436 
5,823 
-32,949 
18,661 
64,751 
9,000 
23,664 
97,000 
67,372 
57,096 
28,721 
907 
5,110 
72,072 
517,270 
50,000 
2,063 
1,676,608 
1,238,361 
-2,498 
410 
410 
1,628 
10,109 
17,000 
9,640 
-8,158 
484,901 
293,221 
227 
-384 
23,107 
23,224 
55,000 
1,856 
1,440,209 
1,820,989 
-9,323 
110,000 
99,084 
3,000 
2,348 
712 
650 
623,096 
89,897 
990 
150,000 
88,112 
4,928 
4,928 
347 
347 
166,000 
134,930 
25,313,0831 
25,313,083 
5,801,8272 
5,801,0412 
32,054,2823 
31,953,201 
29,514,297 
29,383,177 
390,677 
390,677 
1,295,000 
1,295,000 
266,7059 
266,7059 
821,70410 
810,78810 
281,6164 
254,025 
45,039 
38,391- 
127,000 
100,835 
1,541,1855,6 
1,541,1855,6 
4,902,550 7 
4,369,351 
60,000 
36,249 
4,918,4088 
4,856,520 
890,57411 
890,574 
47

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 1-A (Continued) 
See 
Section 
in Text Project 
8. Gloucester Harbor, 
and Annisquam 
River, Mass. 
9. Green Harbor, Mass. 
(Regular Funds) 
(Contributed Funds) 
10. Hampton Harbor, N.H. 
11. Harbor of Refuge, 
Block Island, RI. 
12. Housatonic River, 
Conn. 
13. Kennebunk River, 
Maine 
(Regular Funds) 
(Contributed Funds) 
14. Lagoon Pond, Martha's 
Vineyard, Mass. 
15. Menemsha Creek, 
Martha's Vineyard, 
Mass. 
16. New Haven Harbor, 
Conn. 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY 67 FY 68 FY 69 FY 70 June 30, 1970 
$ 3,084 
12,852 
6,553 
5,082 
202,000 
2,243 
- 
$ 11,000 
12,489 
983 
2,454 
11,304 
140,000 
- - 
861 83,559 
861 83,559 
1,530 78,577 
1,530 78,577 
4,644 
3,430 
3,251 
3,251 
1,170 
10,335 
-318 
182 
71,400 
251,301 
10,000 
17,270 
66,209 
12,209 
5,636 
2,000 
1,714 
29,031 
25,850 
146,729 
142,948 
13,062 
13,062 
36,000 
193,029 
4,740 
4,740 
135,840 
8,742 
8,116 
4,365 
48,022 
1,356 
14,375 
117,063 
68,100 
4,886 
13,000 
509 
75,435. 
11,116 
25,000 
28,568 
64,693 
64,461 
23,446 
16,018 
109,388 
24,000 
18,868 
621 
127,072 
28,150 
5,215 
5,215 
-3,250 
3,040 
116,003 
-1,083 
242 
10,976 
78,476 
30,605 
26,227 
$ 1,296,93412 
1,296,93412 
699,599 
699,367 
263,000 
248,048 
144,558 
114,128 
164,000 
154,708 
200,00013 
200,00013 
93,162 
93,162 
576,856 
576,856 
1,068,881 
969,811 
859,6914 
859,69114 
471,619 
471,619 
350,334 
350,334 
359,700 
359,700 
88,917 
88,917 
32,200 
18,351 
56,9261s 
56,9261s 
322,242 
322,242 
4,205,24616 
4,205,24616 
3,704,64017 
3,698,21717 
48

NEW ENGLAND DIVISION 
TABLE 1-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project 
Newburyport Harbor, 
Mass. 
18. Niantic Bay and 
Harbor, Conn. 
(Regular Funds) 
(Contributed Funds) 
19. Norwalk Harbor, 
Conn. 
20. Plymouth Harbor, 
Mass. 
(Regular Funds) 
(Contributed Funds) 
21. Portland Harbor, 
Maine 
22. Portsmouth Harbor 
and Piscataqua 
River, Maine and 
N.H. 
(Regular Funds) 
(Contributed Funds) 
23. Providence River 
and Harbor, R.L 
17. 
FY 67 FY 68 FY 69 FY 70 June 30, 1970 
$ - 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
17,000 
9,106 
300,000 
1,605 
485,000 
562,299 
5,750 
300,000 
149,781 
184,320 
10,652 
10,652 
165,000 
142,690 
92,500 
380,000 
254,284 
63,885 
63,885 
753,046 
50,000 
7,489 
50,000 
135,531 
20,278 
310,000 
504,092 
455,105 
151,305 
575,000 
178,957 
5,000 
20,039 
17,500 
35,155 
9,436 
124,689 
364,816 
12,259 
20,153 
589,000 
7,131 
600,000 
16,317 
245 
245 
146,000 
12,761 
8,625 
475,000 
629,489 
1,993 
1,993 
-23,261 
1,533 
4,025,000 
4,291,934 
297 
297 
119,872 
-10,000 
15,692 
78 
78 
-8,000 
20,057 
3,880,000 
3,833,572 
94,778 
113,651 
32,522 
2,977 
429 
158,608 
149,601 
4,820,000 
3,873,742 
440,000 
378,113 
$ 565,225 
565,225 
1,014,049 
711,149 
1,464,000 
940,739 
63,231 
35,759 
67,500 
35,155 
531,1298 
531,129 
1,056,981 19 
1,056,98119 
2,107,21820 
1,871,12620 
702,45621 
702,456 
866,000 
49,717 
573,000 
481,056 
400 
400 
9,588,710 
9,588,71022 
1,672,337 
1,591,208 
5,375,74923 
5,236,55723 
158,608 
149,601 
92,500 
19,353,64524 
18,348,727 
2,904,7642s 
2,842,8772s 
49 
- 420,000 
15,128 21,828

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 1-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
24. Provincetown Harbor, New Work 
Mass. Approp. $ 29,000 $ 300 $ 267,000- $178,000 $ 857,45426 
25. Red Brook Harbor, 
Mass. 
26. Rockport Harbor, 
Mass. 
27. Royal River, Maine 
(Regular Funds) 
(Contributed Funds) 
(Contributed Funds, 
Other) 
28. Saco River, Maine 
(Regular Funds) 
(Contributed Funds) 
29. Scarboro River, Maine 
30. Stamford Harbor, 
Conn. 
31. Stony Creek, 
Branford, Conn. 
(Regular Funds) 
(Contributed Funds) 
32. Wellfleet Harbor, 
Mass. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
18,816 
12,505 
41,000 
223,644 
-15,000 
45,576 
5,000 
17,100 
1,000 
275 
-5,964
90 
4,541 
4,541 
2,196 
260 10,317 
- - 
4,346 
12,000 
2,012 
35,000 -2,215 
16,798 35,624 
- 27,599 
- 26,835 
- -16,438 
4,308 -322 
900 
8,000 
1,025 
217,677 
18,518 
645 
645 
15,000 
1,631 
1,335 
1,335 
130,000 
18,942 
245,280 
276,516 
62,000 
154,346 
19,548
8
8 
88,000 
13,865 
92,000 
81 
81 
50 
19,948 
139,327 
22,327 
105,000 
14,589 
32,162 
30,862 
1,000 
1,350 
5,000 
2,123 
-6,977 
111,781 
100,000 
263,976 
58,474 
17,949 
152,747 
10,432 
10,432 
-5,000 
78,283 
81,644 
100 
100 
442,71926 
279,347 
162,347 
139,500 
37,827 
22,000 
22,000 
32,450 
31,150 
336,704 
336,704 
43,407 
39,766 
49,562 
49,562 
18,000 
18,000 
663,739 
663,739 
732,295 
728,348 
82,000 
78,474 
392,6352 
392,63527 
508,723 
508,723 
892,82431 
892,82431 
442,01632 
442,016 
115,000 
109,975 
92,000 
81,644 
157,63433 
157,63433 
6,712 
6,712

NEW ENGLAND DIVISION 
TABLE 1-A (Continued) 
See 
Section 
in Text Project 
33. Wells Harbor, Maine 
34. Westport Harbor and 
Saugatuck River, 
Conn. 
35. Weymouth-Fore and 
Town Rivers, Boston 
Harbor, Mass. 
40. Cliff Walk, Newport, 
R.I. 
41. Oak Bluffs Town 
Beach, Martha's 
Vineyard, Mass. 
45A. Lower Woonsocket, 
R.L 
(Regular Funds) 
(Contributed Funds) 
(Other Contributed 
Funds) 
45B. West Hill Dam, Mass. 
46. Charles River Locks 
& Dam, Mass. 
(Regular Funds) 
47A. Ball Mountain Lake, 
Vt. 
47B. Barre Falls Dam, 
Mass. 
47C. Beaver Brook Lake, 
N.H. 
(Regular Funds) 
COST AND FINANCIAL STATEMENT 
Funding FY 67 FY 68 FY 69 FY 70 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
I- 
50,139 
485,428 
638,092 
190,000 
25,670 
721 
464,000 
284,937 
32,000 
69,319 
29,616 
18,935 
17,854 
24,699 
22,999 
44,991 
75,402 
37,039 
36,757 
-3,336 
6,464 
50,000 
210,605 
543 
543 
86,700 
883 
1,720 
-25,000 
43,158 
-4,553 
189 
-1,457 
555 
32,126 
33,959 
52,340 
60,426 
48,160 
44,653 
4,670 
4,670 
130,339 
12,303 
600,000 
37,388 
50,000 
38,361 
-25,000 
2,969 
32,278 
32,555 
229,718 
52,725 
35,551 
40,420 
51 
113,000 
74,529 
11,660 
106,915 
925,000 
51,207 
46,300 
73,750 
30,126 
5,010 
47,830 
38,752 
135,000 
17,690 
-. 
89,572 
265,436 
60,487 
53,019 
25,000 
19,261 
Total to 
June 30, 1970 
2 360,973 
360,973 
1,085,142 
1,046,671 
19,308 
19,308 
170,379 
147,598 
8,557,75328,30 
7,117,62328,30 
444,11229 
444,11229 
183,000 
113,000 
158,000 
20,842 
6,788,000 
6,542,884 
1,312,000 
1,254,135 
492,000 
487,925 
2,306,90235 
2,306,902ss 
237,197 
228,073 
135,000 
17,690 
10,535,238 
10,535,238 
649,801 
648,442 
1,967,819 
1,967,819 
438,416 
431,801 
25,00ooo 
19,261

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 1-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section 
in Text 
47D. 
Project 
Birch Hill Dam, 
Mass. 
47E. Chicopee Falls, 
Mass. 
(Regular Funds) 
(Required Contributed 
Funds) 
47F. Colebrook River 
Lake, Conn. 
47G. Conant Brook Dam, 
Mass. 
47H. Gardner, Mass. 
47I. Gaysville Lake, Vt. 
47J. Knightville Dam, 
Mass. 
47K. Littleville Lake, 
Mass. 
47L Mad River Lake, 
Mass. 
47M. North Hartland 
Lake, Vt. 
47N. North Springfield 
Lake, Vt. 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
FY 67 FY 68 
$ 55,000 $ 100,000 
8,801 64,719 
34,120 41,790 
56,956 40,628 
-16,000 - 
5,602 4,589 
-1,095 
5,300,000 
5,082,314 
124,000 
217,890 
7,500 
6,471 
34,500 
33,735 
14,332 
40,000 
43,623 
-25,000 
99,494 
32,382 
31,329 
20,000 
1,726 
44,976 
42,046 
-2,464 
36,606 
35,464 
2,875,000 
2,798,403 
28,000 
31,832 
16,686 
17,715 
770 
2,000 
6,021 
42,733 
68,926 
-1,588 
4,550 
37,120 
38,136 
2,950 
44,700 
45,360 
100,000 
15,435 
48,700 
49,830 
FY 69 FY 70 
$ 115,000 $ 1,000 
16,849 173,061 
35,506 44,720 
37,263 38,468 
353- 
1,301,000 
1,100,996 
8,863 
7,271 
1,000 
3,924 
20,518 
20,518 
133 
88,000 
68,544 
62,383 
60,255 
46,699 
45,570 
50,000 
28,548 
48,570 
43,876 
5,000 
18,337 
58,774 
46,442 
-155,000 
282,638 
46,176 
46,176 
1,680 
3,680 
31,390 
31,390 
927 
1,229 
66,600 
86,056 
65,588 
67,533 
55,533 
56,082 
47,000 
37 
708 
61,680 
68,674 
-1,000 
11,376 
375,471 
133,945 
52 
Total to 
June 30, 1970 
$ 4,566,23836 
4,547,68437 
683,265 
676,960 
2,177,000 
2,176,005 
436,20038 
416,71139 
14,115,000 
13,986,528 
55,039 
53,447 
2,949,680 
2,949,680 
76,094 
76,094 
493,927o 
493,92740 
206,600 
206,600 
3,220,44541 
3,220,44541 
818,328 
814,315 
7,013,412 
7,013,412 
208,148 
207,487 
4,817,757 
4,770,794 
7,138,58942 
7,102,52143 
385,727 
385,719 
6,881,5264 
6,822,674 
704,499 
450,487

NEW ENGLAND DIVISION 
TABLE 1-A (Continued) 
See 
Section 
in Text Project 
470. Otter Brook Lake, 
N.H. 
47P. Sucker Brook Dam, 
Conn. 
(Regular Funds) 
(Contributed Funds) 
47Q. Surry Mountain Lake, 
N.H. 
47R. Three Rivers, Mass. 
47S. Townshend Lake, Vt. 
47T. Tully Lake, Mass. 
47U. Union Village Dam, 
Vt. 
47V. White River, 
Hartford, Vt. 
48. Fox Point Barrier, 
Narragansett Bay, 
RI. 
(Regular Funds) 
(Contributed Funds) 
49A. Ansonia-Derby, Conn. 
(Other Contributed 
Funds) 
49B. Black Rock Lake, 
Conn. 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
FY 67 FY 68 FY 69 
$ -1,471 $ - $ - $ 
147 
37,663 
37,328 
915,000 
327,469 
18,100 
35,253 
49,983 
49,507 
8,000 
8,210 
20,000 
20,154 
36,833 
43,292 
34,182 
34,181 
48,818 
46,084 
16,000 
4,600 
245,050 
41,118 
39,377 
661,146 
127,000 
24,574 
40,787 
36,706 
21,834 
4,440 
62,000 
16,980 
51,851 
43,281 
63,624 
62,900 
47,422 
38,681 
514,000 
475,565 
20,000 
34,900 
107,300 
47,141 
43,917 
23,507 
22,308 
50,914 
58,035 
37,074 
37,683 
67,149 58,449 
39,981 72,379 
- 120,000 
13,900 8,700 
- -130,000 
68,506 155,170 
Total to 
FY 70 June 30, 1970 
- $ 4,061,0486 
_ 4,061,048 
56,112 458,600 
67,002 458,600 
314,972 2,153,972 
313,224 2,015,518 
- 20,000 
35,000 2,637,316 
28,547 2,599,9084 
69,567 716,155 
71,301 709,855 
-2,645 1,577,189 
187 1,577,18949 
40,000 7,327,2455 
24,169 7,288,15951 
541,218 853,551 
387,204 696,617 
- 1,551,61352 
- 1,551,61352 
94,271 552,247 
92,217 550,074 
4,010,698 
- 4,010,698 
51,781 619,424 
61,842 613,153 
-1,000 149,000 
31,700 70,000 
-8,820 11,091,180 
2,345 11,091,180 
50,041 32,203 60,748 68,715 
420,000 175,000 2,435,000 4,240,000 
473,107 134,653 1,831,545 4,708,994 
- 440,050 231,300 10,995 
- 173,500 104,088 258,627 
2,080,000 1,780,000 2,353,000 1,335,000 
1,884,279 1,987,033 2,203,010 1,085,505 
3,679,500 s 3 
3,679,500 s s 
7,870,000 
7,693,539 
682,34554 
536,215 
8,245,000 
7,837,734 
53

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 1-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding 
Maint. 
Approp. 
Cost 
49C. Danbury, Conn. New Work 
Approp. 
Cost 
49D. Derby, Conn. New Work 
Approp. 
Cost 
49E. East Branch Dam, New Work 
Conn. Approp. 
Cost 
49F. Hall Meadow Brook New Work 
Dam, Conn. Approp. 
Cost 
49G. Hancock Brook Lake, New Work 
Conn. Approp. 
Cost 
Maint. 
Approp. 
Cost 
491 Hop Brook Lake, Conn.New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
49I. Northfield Brook New Work 
Lake, Conn. Approp. 
Cost 
Maint. 
Approp. 
Cost 
49J. Thomaston Dam, Conn.New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
50A. Baker Brook, Mass. New Work 
Approp. 
Cost 
50B. Blackwater Dam, N.H. New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
50C. Edward MacDowell New Work 
Dam, N. H. Approp. 
Cost 
Maint. 
Approp. 
Cost 
50D. Franklin Falls New Work 
Dam, N.H. Approp. 
Cost 
Maint. 
Approp. 
Cost 
FY 67 FY 68 FY 69 FY 70 June 30, 1970 
- 
30,000 
1,547 
100,000 
39,157 
25,000 
158,831 
8,496 
8,497 
1,600,000 
1,580,469 
20,000 
112,047 
8,740 
8,740 
20,797 
22,854 
35,843 
43,532 
43,000 
21,643 
51,971 
31,074 
69,028 
49,349 
81,000 
103,878 
212,000 
244,706 
32,500 
54,767 
9,800 
9,800 
825,000 
757,022 
12,660 
12,598 
1,000 
75,451 
10,587 
10,587 
16,148 
18,952 
43,195 
43,941 
26,500 
27,835 
41,163 
33,516 
59,543 
49,669 
155,000 
118,305 
300,000 
188,084 
114,000 
123,354 
12,561 
12,561 
132,000 
223,894 
29,940 
27,436 
30 
12,750 
12,690 
46,830 
43,086 
87,000 
16,387 
34,518 
53,629 
41,522 
70,136 
69,829 
91,826 
$ 21,862 
21,862 
9,402 
715,000 
140,053 
55,000 
2,585 
11,157 
11,157 
398 
6,983 
16,500 
13,558 
60,824 
108,988 
42,327 
44,387 
-487 
28,722 
28,782 
59,884 
57,429 
7,000 
76,321 
36,487 
37,408 
61,935 
55,728 
77,118 
80,088 
$ 21,862 
21,862 
266,000 
233,132 
1,327,000 
612,000 
1,938,8365 
1,886,42156 
2,572,357 
2,572,357 
4,126,911 
4,126,911 
52,766 
49,834 
5,532,824 
5,479,559 
84,927 
84,421 
2,830,512 
2,830,512 
72,852 
72,852 
14,280,112 
14,280,112 
346,570 
340,216 
94,000 
92,708 
1,319,7465 
1,319,7467 
397,810 
397,180 
2,014,253 s s 
2,014,253 s 
586,699 
580,491 
7,950,48759 
7,950,48759 
1,091,329 
1,084,943 
54

NEW ENGLAND DIVISION 
TABLE 1-A (Continued) 
See 
Section 
in Text Project 
50E. Hopkinton-Everett 
Lakes, N.H. 
50F. Nookagee Lake, Mass. 
50G. Whitmanville Lake, 
Mass. 
51. New Bedford, Mass. 
(Required Funds) 
52. New London, Conn. 
53. Stamford, Conn. 
(Contributed Funds) 
54. Stratford, Conn. 
55A. Buffumville Lake, 
Mass. 
55B. East Brimfield Lake, 
Mass. 
55C. Hodges Village Dam, 
Mass. 
55D. Mansfield Hollow 
Lake, Conn. 
COST AND FINANCIAL STATEMENT 
Total to 
Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
$ 7,000 
18,770 
87,200 
67,307 
25,000 
322,310 
54,400 
87,073 
60,000 
-68,921 
85,000 
7,860 
2,400,000 
2,431,458 
-" 
800,000 
1,135,108 
35,526 
35,542 
20,000 
1,339 
27,286 
27,126 
26 
34,126 
29,816 
16,900 
30,903 
36,142 
47,941 
$ 37,800 
12,879 
89,909 
81,154 
60,000 
13,874 
255,000 
185,495 
51,200 
72,438 
24,374 
2,728 
1,535,000 
1,394,627 
15,300 
15,300 
700,000 
684,083 
100,000 
97,662 
36,909 
35,300 
-2,035 
233 
30,548 
29,292 
-898 
-24 
86,209 
47,818 
625. 
5,812 
42,413 
42,233 
$ 36,000 
17,983 
195,130 
119,581 
68,000 
24,754 
165,000 
147,069 
68,797 
74,400 
50,969 
23,479 
70,000 
112,317 
25,000 
369,566 
33,700 
32,085 
64,564 
194,000 
156,458 
41,670 
37,351 
-9,900 
1,455 
49,919 
45,393 
51,947 
94,452 
15 
41,314 
40,117 
$ 1,794 
30,933 
136,929 
229,528 
179,000 
35,750 
245,000 
105,395 
-1,622 
31,080 
43,666 
9,103 
150,000 
239,829 
9,000 
30,834 
132,650 
79,163 
73,170 
96,228 
246,000 
247,943 
45,956 
51,930 
40,000 
12,250 
49,374 
51,618 
48,549 
38,893 
61,874 
61,874 
55 
$ 21,307,8126 
21,290,962 
709,703 
698,059 
247,000 
60,504 
470,000 
266,338 
11,500,000 
11,492,053 
410,580 
398,829 
6,610,00062 
6,506,0516 
615,000 
603,843 
7,229,000 
7,199,138 
181,650 
126,548 
3,333,17063 
3,281,80463 
540,000 
502,063 
2,998,6034 
2,998,603 
372,113 
372,076 
6,938,14365 
6,886,761" 
316,183 
312,399 
4,420,91567 
4,420,915 
371,983 
371,983 
6,447,1646 
6,447,164 
553,164 
550,518

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 1-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
55E. West Thompson Lake, New Work 
Conn. Approp. $ - $ - $ 25,000 $ 28,000 $ 6,598,000 
Cost 214,470 60,577 12,979 34,600 6,578,074 
Maint. 
Approp. 31,489 32,788 34,217 47,867 167,238 
Cost 31,401 31,287 35,306 42,167 161,038 
55F. Westville Lake, New Work 
Mass. Approp. 30,000 -3,129 - - 5,617,016 
Cost 36,099 1,013 - - 5,617,016 
Maint. 
Approp. 32,358 34,990 87,193 45,392 317,066 
Cost 31,326 34,518 37,097 94,645 314,663 
56. Trumbull Pond New Work 
Lake, Conn. Approp. - 100,000 165,000 - 265,00() 
Cost - 46,512 168,023 - 214,535 
1. Includes $1,465,123 for previous projects. Includes 
$935,303 emergency relief funds and $1,030,806 public works 
funds. 
2. Includes $17,879 for previous projects. Excludes $17,767 
contributed funds. 
3. Includes $6,138,157 from public works funds and 
$4,849,740 from emergency relief funds. Excludes $115,432 
contributed funds. 
4. Includes $10,000 for previous projects. 
5. Includes $287,374 for previous projects. Excludes 
$130,410 contributed funds. 
6. Includes $9,000 for subproject "Eightmile River, Conn." 
7. Includes $366,348 for previous projects. 
8. Includes $330,204 for previous project. 
9. Includes $7,889 for new work. 
10. Includes $83,276 for maintenance for previous project. 
IL, Includes $81,410 for previous project. 
12. Includes $21,000 for previous projects. Excludes $25,000 
contributed funds. 
13. Excludes $193,761 contributed funds. 
14. Excludes $222,010 expended from contributed funds. 
15. Excludes $12,500 contributed funds. 
16. Includes $331,626 for previous projects. Includes 
$290,877 National Industrial Recovery Funds and $59,207 
public works funds. 
17. Includes $32,570 for previous projects. 
18. Includes $162,517 for previous projects. Excludes 
$34,500 expended from contributed funds. 
19. Includes $66,120 for previous projects. 
20. Includes $188,647 for previous projects. 
21. Includes $2,013 for previous projects. 
22. Includes $692,435 for previous projects. 
23. Includes $130,393 for previous project. 
24. Includes $3,761,412 for previous projects. 
25. Includes $650,136 for previous projects. 
26. Includes $215,801 for previous project. 
27. Excludes $10,000 contributed funds. 
28. Includes for previous projects $735,900 (Weymouth-Fore 
River) and $25,000 (Town River). 
29. Includes for previous projects $5,250 (Weymouth-Fore 
River) and $12,577 (Town River). 
30. Excludes contributed funds expended $100,000 (Weymouth-
Fore River) and $340,237 (Town River). 
31. Includes $135,143 for previous projects and excludes 
$169,686 expended from contributed funds. 
32. Includes $59,420 for previous project. 
33. Includes $11,350 for previous project and excludes 
$32,000 expended from contributed funds. 
34. Excludes $212,000 expended from contributed funds. 
35. Includes $18,310 Code 711 funds. 
36. Includes $401,028 Code 711 funds. 
37. Includes $382,474 Code 711 funds. 
38. Cash for construction only. 
39. Excludes $12,000 expended from land condemnations. In 
addition, $25,184 expended from Contributed Funds, Other, for 
relocations. 
40. Excludes $15,000 expended from required contributed 
funds. 
41. Includes $4,109 Code 711 funds. 
42. Includes $70,000 Code 711 funds. 
43. Includes $33,932 Code 711 funds. 
44. Includes $109,536 Code 711 funds. 
45. Includes $50,684 Code 711 funds. 
46. Includes $65,288 Code 711 funds. 
47. Includes $273,783 Code 711 funds. 
48. Includes $236,375 Code 711 funds. 
49. Excludes $565,168 Contributed Funds, Other. 
50. Includes $174,000 Code 711 funds. 
51. Includes $134,914 Code 711 funds. 
52. Includes $3,695 Code 711 funds. 
53. Cash for construction only. Excludes $245,000 expended 
to date for land condemnation. 
54. Includes $446,350 from Ansonia, $225,000 from Derby. 
55. Includes $55,000 Code 711 funds. 
56. Includes $2,585 Code 711 funds. 
57. Includes $2,881 Code 711 funds. 
58. Includes $6,432 Code 711 funds. 
59. Includes $4,671 Code 711 funds. 
60. Includes $52,000 Code 711 funds. 
61. includes $35,151 Code 711 funds. 
62. Cash for construction only. Excludes $146,020 expended 
to date for land condemnations. 
63. Cash for construction only. Excludes $199,410 expended 
to date for land condemnations. 
64. Includes $71,943 Code 711 funds. 
65. Includes $88,800 Code 711 funds. 
66. Includes $37,418 Code 711 funds. 
67. Includes $6,255 Code 711 funds. 
68. Includes $68,717 Code 711 funds. 
56

NEW ENGLAND DIVISION 
TABLE 1-B 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
Work Authorized Documents 
July 14, 1960 as amended in 1965 
Mar. 2, 1825 
June 14, 1880 
Sept. 19, 1890 
July 25, 1892 
Aug. 5, 1886 
July 13, 1892 
Mar. 3, 1899 
June 13, 1902 
Aug. 8, 1917 
Aug. 30, 19352 
Do. 
Aug. 26, 1937 
Oct. 17, 1940 
Sept. 7, 1940 
Mar. 2, 19453 
July 24, 1946 
July 3, 1958 
Oct. 23, 1962 
Jan. 21, 1927 (Sec. 2) 
Included in Public Works 
Administration program, 
Sept. 6, 1933. 
June 26, 1934 (Permanent 
Appropriations Repeal Act). 
Public Works 
Administration program, 
Apr. 29, 1935. 
Included in Emergency Relief 
Program, May 28, 1935. 
ANDREWS RIVER, MASS. (See Section 1 of Text). 
Channel 6 feet deep, 75 feet wide from deep water in Nantucket 
Sound to public marina; 2 jetties; 3-acre maneuvering and 
anchorage basin. 
BOSTON HARBOR, MASS. (See Section 2 of Text). 
Preservation of islands by seawalls. 
Weir River (Nantasket Beach Channel) 9-1/2 ft. deep, 100 ft. 
wide to Steamboat wharf at Nantasket. 
Weir River (Nantasket Beach Channel) 9-1/2 ft. deep, 150 ft. 
wide to Steamboat wharf at Nantasket. 
Weir River (Nantasket Beach Channel) from mouth of Weir River 
to Steamboat wharf at Nantasket Beach 12 ft. deep, 150 ft. 
wide. 
Fort Point Channel. 
Channel 15 feet deep from Long Island to Nixes Mate Shoal 
(Nixes Mate or Nubble Channel). 
Channel 27 feet deep from Nantasket Roads to President Roads. 
For 30-foot channel from sea to President Roads through Broad 
Sound by less direct route than 35- and 40-foot channels. 
For 35-foot channel from sea to Boston Naval Shipyard, Chelsea 
and Charles River Bridges. 
Elimination from project of removal of Finns Ledge at outer 
entrance. 
Depth of 40 feet (45 feet in rock) in Broad Sound Channel 
Present project dimensions of channel from President Roads to 
Commonwealth pier No. 1, East Boston and anchorage area north 
side of President Roads. 
Present project dimensions of that part of approach channel to 
U.S. Navy drydock No. 3, at South Boston between Main Ship 
Channel and U.S. harbor line. 
Chelsea River channel, 30 feet deep. 
Reserved channel 30 feet deep. 
Abandons seaplane channel authorized in 1940 River and Harbor 
Act (H. Doc. 262, 76th Cong., 1st sess). 
Extension of 40-foot channel. 
Extension of President Roads anchorage. 
Reserved channel 35 feet deep, 430 feet wide, extending 1 mile 
from 40-foot main channel to L St. 
Chelsea River Channel and Maneuvering Basin 35 feet deep. 
CAPE COD CANAL, MASS. (See Section 3 of Text). 
Purchase canal from Boston, Cape Cod & New York Canal Co., in 
accordance with contract dated July 29, 1921, executed by 
that company. 
Construct 3 bridges and widen canal to 250 feet. 
Operation and care of works of improvement provided for the 
funds from War Department appropriations for rivers and 
harbors. 
Construct a mooring basin. 
Dredging and bank protection. 
Section 107 PL 86-645, Authorized 
by Chief of Engineers May 2, 
1966. 
H. Ex. Doc. 206, 48th Cong., 2d 
sess. Annual Report, 1885, 
p. 543. 
Annual Report, 1887, p. 517. 
Annual Report, 1893, p. 766. 
H. Doc. 133, 55th Cong., 2d sess. 
Annual Report, 1898, p. 886. 
H. Doc. 119, 56th Cong., 2d sess. 
Annual Report, 1901, p. 1096. 
Authorized by Chief of Engineers 
Mar. 11, 1913. 
H. Doc. 931, 63d Cong., 2d sess. 
H. Doc. 244, 72d Cong., 1st sess. 1 
Rivers and Harbors Committee 
Doc. 29, 74th Cong., 1st sess. 1 
Rivers and Harbors Committee 
Doc. 24, 75th Cong., 1st sess. l 
H. Doc. 225, 76th Cong., 1st sess. 1 
Public Law 420, 78th Cong. 
H. Doc. 733, 79th Cong., 2d sess. 1 
H. Doc. 244, 80th Cong., 1st sess. 1 
H. Doc. 349, 84th Cong.1 
H. Doc. 350, 87th Cong., 2d sess. 1 
H. Doc. 139, 67th Cong., 2d sess. 
H. Doc. 795, 71st Cong., 3d sess. 
Do. 
Do. 
Do. 
57 
Documents

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 1-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 30, 1935 
Mar. 2, 1945 
July 3, 1958 
Mar. 2, 1945 
Mar. 2, 1945 
July 14, 1960 as amended. 
June 10, 1872 
Mar.3, 1881 
June 25, 1910 
Feb. 27, 1911 
Mar. 2, 1919 
Aug. 30, 1935 
May 24, 1937 
Mar. 2, 1945 
May 17, 19505 
July 14, 1960 (Sec. 107) 
July 3, 19306 
July 24, 1946 
Sept. 3, 1954 
Aug. 13, 1968 
Aug. 11, 1888 
Aug 18, 1894 
June 13, 1902 
June 25, 1910 
Aug. 30, 1935 
Mar. 2, 1945 
Existing project for main canal adopted. 
15-foot channel and turning basin in Onset Bay. 
Extend East Boat Basin for an area of about 4.3 acres to a 
depth of 8 feet. 
CHATHAM (STAGE) HARBOR, MASS. ((See Section 4 of Text). 
Entrance channel 10 feet deep, 150 feet wide from Chatham 
Roads into upper harbor. 
COHASSET HARBOR, MASS. (See Section 5 of Text). 
Anchorage area in inner harbor 7 feet deep, and channel 
90 feet wide, 8 feet deep from anchorage area to outer 
harbor. 
Construction of anchorage areas 6 feet deep. 
CONNECTICUT RIVER BELOW HARTFORD, CONN. (See 
Section 6 of Text). 
Jetties at the mouth. 
The Hartford dike. 
Channel and turning basin in Eightmile River. 
Present project dimensions of channel over Saybrook bar. 
Dikes, training walls, and revetments. 
Present project dimensions of channel and additional dikes, 
training walls, revetments, and accessory works. 
Park River declared nonnavigable. 
Channel and anchorages, North Cove, Old Saybrook. 
Channel, anchorage, and turning basin, Eightmile River. 
Channel and anchorage in Essex Cove. 
Channel and anchorage in Wethersfield Cove. 
FALL RIVER HARBOR, MASS. (See Section 7 of Text). 
30-foot channel including Hog Island Shoal 6 and maintenance 
of 25-foot anchorage. 
35-foot channel and turning basin. 
Deepening mid bay channel to 35 feet for a width of 400 feet 
between deep water in Mount Hope Bay and Globe Wharf. 
Deepening Mount Hope Bay and Tiverton Channels to 40 feet. 
GLOUCESTER HARBOR AND ANNISQUAM RIVER, MASS. 
(See Section 8 of Text) 
Remove ledges and boulders, and dredge in Gloucester'Harbor. 
Construct breakwater at entrance to Gloucester Harbor from 
Eastern Point to Round Rock shoal. 
Termination at Cat Ledge of breakwater authorized by act of 
Aug. 18, 1894. 
Remove 8 ledges in Gloucester Harbor. 
Dredge in Annisquam River and removal of a ledge in Gloucester 
Harbor near entrance to Annisquam River. 
Dredge 8-foot anchorage area in Lobster Cove, Annisquam River. 
Rivers and Harbors Committee 
Doc. 15, 74th Cong., 1st sess. 
H. Doc. 431, 77th Cong., 1st 
sess. 
H. Doc. 168, 85th Cong. 
H. Doc. 456, 77th Cong., 1st 
sess. Annual Report 1942. 
H. Doc. 425, 76th Cong., 1st 
sess. Annual Report 1904, 
p. 60 
Section 107 P.L. 86-645 
Authorized by Chief of 
Engineers Oct. 12, 1965 
Present project dimensions 
approved by Chief of Engineers, 
Dec. 22, 1887. 
Present project dimensions 
authorized by Chief of Engineers 
in 1889. 
H. Doc. 327, 60th Cong., 1st sess. 
H. Doc. 1294, 61st Cong., 3d sess. 
H. Doc. 132, 65th Cong., 1st sess. 4 
H. Doc. 49, 73d Cong., 1st sess. 4 
Ltr. Sec. War, Apr. 21, 1937. 
H. Doc. 368, 76th Cong., 1st sess. 4 
H. Doc. 666, 80th Cong., 2d sess.4 
Chief of Engineers Oct. 18, 1961. 
Chief of Engineers Nov. 15, 1960. 
H. Doc. 158, 71st Cong., 2d sess. 
H. Doc. 628, 79th Cong., 2d sess. 
H. Doc. 405, 83d Cong. 
H. Doc. 175, 90th Cong., 1st sess. 4 
Annual Report, 1887, p. 503. 
H. Ex. Doc. 56, 48th Cong., 2d 
sess., and Annual Report, 1885, 
p. 534. 
Annual Report, 1902, p. 89. 
H. Doc. 1112, 60th Cong., 2d sess. 
Rivers and Harbors Committee, 
Doc. 39, 72d Cong., 1st sess. 
H. Doc. 329, 77th Cong., 1st sess. 
58

TABLE 1-B (Continued) 
NEW ENGLAND DIVISION 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 23, 1962 
July 14, 1960 as amended in 1965 
July 14, 1960 as amended in 1965 
July 11, 1870 
Aug. 2, 1882 
Aug. 5, 1886 
June 3, 1896 
July 25, 1912 
Dec. 22, 1944 
July 2, 1958 
July 14, 1960 
Oct. 23, 1962 
Oct 27, 1965 
Mar. 2, 1829 
Aug. 14, 1876 
Sept. 19, 1890 
Oct. 23, 1962 
Entrance channel into Inner Harbor 20 feet deep, and turning 
basin. Access channel 20 feet deep along waterfront to 
northwest of Gloucester Fish pier. Access channel 20 feet 
deep along waterfront southeast of Gloucester Fish pier. 
Access channel 16 feet deep into Smith Cove. 
An access channel 18 feet deep along waterfront west of Harbor 
Cove and into Harbor Cove. 
A 5-acre anchorage 15 feet deep east of entrance to Harbor 
Cove. 
A 10-acre anchorage 16 feet deep opposite entrance to Smith 
Cove. 
Remove isolated rock shoal adjacent to entrance channel south 
of Harbor Cove to a depth of 24 feet. 
GREEN HARBOR, MASS. (See Section 9 of Text). 
Channel 6 feet deep, 100 feet wide from deep water to head of 
navigation; anchorage near town pier; sealing, rebuilding in 
part and extension of existing west jetty. 
HAMPTON HARBOR, N.H. (See Section 10 of Text). 
Extending north jetty 1,000 feet, raising outer 300 feet south 
jetty and constructing 180-foot spur to high ground, channel 
8 feet deep, 150 feet wide across entrance bar. 
HARBOR OF REFUGE, BLOCK ISLAND, R.I. (See Section 11 
of Text). 
The main breakwater. 
Repairs to basin walls and cliff protection east of harbor. 
Breakwater inclosing inner harbor. 
Raising crest of main breakwater and making it sandtight. 
Rebuilding basin walls and present project dimensions of 
dredged area. 
HOUSATONIC RIVER BASIN, CONN. (See Section 12 of Text). 
Construct Thomaston Dam and Reservoir. 
Construct Hall Meadow Brook and East Branch Dam and Reservoir. 
Construct Hop Brook, Northfield Brook, Hancock Brook, and 
Black Rock Dams and Reservoirs. 
Construct Ansonia-Derby local protection project on Naugatuck. 
River. 
Construct Danbury, Conn., and Derby, Conn. local protection 
projects. 
KENNEBUNK RIVER, MAINE (See Section 13 of Text). 
Repair of pier on east side of channel entrance. 
Deepening at Wading Place and Mitchells Point. 
Jetty at Wading Place. 
8-foot channel. 
6-foot channel. 
6-foot anchorage, west side of channel. 
6-foot anchorage, east side of channel. 
Extension of west jetty, and construction of sand fence. 
H. Doc. 341, 87th Cong., 2d sess. 
Section 107, PL 86-645 Authorized 
by Chief of Engineers Dec. 15, 
1965. 
Section 107, PL 86-645, Chief of 
Engineers February 18, 1964. 
Annual Report 1868, p. 785, and 
S. Misc. Doc. 81,40th Cong., 
2d sess. 
S. Ex. Doc. 26, 47th Cong., 1st 
sess. 
S. Doc. 27, 48th Cong., 2d sess. 
and Annual Report, 1885, p. 610. 
H. Doc. 83, 54th Cong., 1st sess. 
H. Doc. 828, 60th Cong., 1st sess. 4 ' 5 
H. Doc. 338, 87th Cong., 1st sess. 
H. Doc. 81, 85th Cong., 1st sess. 
H. Doc. 372, 86th Cong., 2d sess. 
H. Doc. 437, 87th Cong., 2d sess. 
H. Doc. 324, 88th Cong., 2d sess. 
Annual Report, 1875, p. 115. 
H. Ex. Doc. 136, 51st Cong., 1st 
sess. and Annual Report 1890, 
p. 471. 
H. Doc. 459, 87th Cong., 2d sess. 4 
59

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 1-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 14, 1960, as amended in 1965 
LAGOON POND, MARTHA'S VINEYARD, MASS. (See Section 14 of Text). 
Entrance channel 8 feet deep, 100 feet wide. PL 86-645 Section 107, Authorized 
by Chief of Engineers Dec. 24, 
1968. 
MENEMSHA CREEK, MARTHA'S VINEYARD, MASS. (See Section 15 of 
Text). 
Mar. 2, 1945 
Aug. 2, 1882 
Mar. 3, 1899 
June 25, 1910 
July 25, 1912 
Do. 
July 3, 1930 
Aug. 30, 19358 
Mar. 2, 1945 
July 24, 1946 
Aug. 16, 1949 
Aug. 9, 1955 
June 14, 1880 
June 25, 1910 
Mar. 2, 194510 
July 14, 1960 as amended in 1965 
Mar. 2, 1919 
Mar. 2, 1945 
Mar. 3, 1899 
Mar. 4, 1913 
Sept. 22, 1922 
Oct. 23, 1962 
July 9, 1965 
July 4, 1836 
June 23, 1866 
June 3, 1896 
10-foot entrance channel; 10-foot anchorage basin; 8 foot 
channel. 
NEW HAVEN HARBOR, CONN. (See Section 16 of Text). 
Sandy Point dike. 
The 16-foot anchorage basin. 
Brewery Street channel, removal of rocks in Morris Cove and 
present project dimensions of 15-foot basin. 
Present project dimensions of channels in Mill River. 
Present project dimensions of West River channel and anchorage. 
18- and 16-foot channels in Quinnipiac River. 
25-foot channel. 
30-foot channel and anchorage and present location of 16-foot 
anchorage. 
35-foot main channel, elimination of 30-foot anchorage, present 
location and extent of 16-foot anchorage and 22-foot channel 
and turning basin in Quinnipiac River. 
Brewery Street channel declared nonnavigable. 
Abandonment of upper end of West River. 
NEWBURYPORT HARBOR, MASS. (See Section 17 of Text). 
Construction of rubblestone jetties. 
Dredging the bar at entrance to harbor. 
Dredging channel from sea to wharves and a widened turning 
basin. 
NIANTIC BAY AND HARBOR, CONN. (See Section 18 of Text). 
Channel 8 feet deep, 100 feet wide from deep water in bay to 
highway bridge; thence 6 feet deep, 100 feet wide to deep 
water south of Sandy Point. 
NORWALK HARBOR, CONN. (See Section 19 of Text). 
South Norwalk and Norwalk channels 10-foot anchorage. 
East Norwalk channel widening and anchorage. 
PLYMOUTH HARBOR, MASS. (See Section 20 of Text). 
Beach protection. 
Dredging 18-foot channel. 
Dredging 15-foot extension, including turning basin. 
Rubblestone breakwater. Anchorages are 8 feet deep inside 
breakwater. Elimination of authorized 18-foot anchorage 
from existing project. 
Recreational development. 
PORTLAND HARBOR, MAINE (See Section 21 of Text). 
Breakwater on southerly side of mouth of inner harbor. 
Extension of breakwater. 
Dredging to 30 feet over greater part of inner harbor. 
H. Doc. 365, 76th Cong. 1st sess. 
Plans approved by a Board of 
Engineers, Oct. 2, 1882. 
H. Doc. 82, 55th Cong., 1st sess. 
H. Doc. 1159, 60th Cong., 2d sess. 
H. Doc. 26, 62d Cong., 1st sess. 
H. Doc. 535, 62d Cong., 2d sess. 
H. Doc. 686, 69th Cong., 2d sess. 
H. Doc. 479, 72d cong., 2d sess. 
H. Doc. 307, 76th Cong., 1st sess. 
H. Doc. 517, 79th Cong., 2d sess. 4 
Annual Report 1910, p. 59. 
H. Doc. 703, 76th Cong., 3d sess. 
PL 86-645 Section 107 Approved 
by Chief of Engineers Aug. 24, 
1964. 
H. Doc. No. 1143, 63d Cong., 2d 
sess. 
H. Doc. 220, 76 Cong., 1st sess. 
Annual Report for 1899, p. 1089. 
H. Doc. 1194, 62d Cong., 3d sess. 
H. Doc. 996, 66th Cong., 3d sess. 
H. Doc. 124, 87th Cong., 2d sess. 
H. Doc. 491, 23d Cong., 1st sess. 
S. Doc. 271, 54th Cong., 1st sess. 
60

NEW ENGLAND DIVISION 
TABLE 1-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 3, 1905 
(sundry civil) 
July 25, 1912 
Aug. 8, 191711 
Mar. 2, 1945 
Do. 
July 24, 1946 
Aug. 13, 1957 
Oct. 23, 1962 
Sept. 3, 1954 
Oct. 23, 1962 
Aug. 26, 1937 
Oct. 18, 1965 
June 25, 1910 
June 30, 1948 
July 14, 1960 as amended in 1965 
June 13, 1902 
Mar. 3, 1871 
River & Harbor Act 1882 
July 14, 1960 as amended in 1965 
RED BROOK HARBOR, BOURNE, MASS. (See Section 25 of Text). 
Entrance channel, 6 feet deep, 100 feet wide. 
ROCKPORT HARBOR, MASS. (See Section 26 of Text). 
Rebuilding two breakwaters at entrance and removing principal 
rocks in harbor. 
ROYAL RIVER, MAINE (See Section 27 of Text). 
Enlargement of channel through bar at Gravel Point and removal 
of several ledges near Yarmouth. 
Construction of 195-foot rubblestone jetty and dredging 
channel. 
8 foot channel, 80 feet wide and anchorage. 
PL 86-645 Section 107, Authorized 
by Chief of Engineers Oct. 21, 
1968. 
Chief of Engineers, Apr. 27, 1965 
Section 107, PL 86-645. 
SACO RIVER, MAINE (See Section 28 of Text). 
Extension of piers, placing of buoys, and removal of 
obstructions at entrance to harbor. 
Breakwater on north side of mouth of river. 
61 
Extension of 30-foot depth up Fore River to Boston & Main RR. 
bridge and in channel of approach to Back Cove. 
30-foot anchorage; 14 feet at entrance to Back Cove; restore H. Doc. 489, 62d Cong., 2d sess. 
12-foot depth in Back Cove and 30-foot depth in approach 
as well as in lower part of harbor. 
35-foot depth in lower part of main harbor and channel of H. Doc. 71, 65th Cong., 1st sess. 
approach, and remove 2 obstructing ledges in main channel. 
35-foot anchorage, approximately 170 acres in area northwest H. Doc. 560, 76th Cong., 3d sess. 
of House Island. 
Maintain Soldier Ledge Channel in Hussey Sound, at depth of H. Doc. 730, 79th Cong., 2d sess. 
40-feet. 
Deepen 30-foot channel to 35 feet, 35-foot turning basin H. Doc. 510, 79th Cong., 2d sess. 
easterly of Vaughan Bridge; breakwater at Spring Point. 
Abandonment of upper end of 12-foot channel from 2,500 feet Public Law 126, 85th Cong., 1st 
upstream of Tukey Bridge to head of Back Cove. sess. 71 stat. 344. 
Entrance channel 45 feet deep from deep water in Casco Bay to a H. Doc. 216, 87th Cong., 1st sess. 
line opposite Fort Gorges. A maneuvering basin and anchorage 
45 feet deep in existing House Island anchorage area. 
PORTSMOUTH HARBOR & PISCATAQUA RIVER, MAINE AND N.H. (See 
Section 22 of Text). 
Removal of ledge rock; widening 35-foot channel; extending Annual Report 1892 H. Doc. 556, 
channel and maneuvering basins above Boiling Rock and at 82d Cong., 2d sess. 
head of project. 
Modified existing project for widening and extending 35-foot H. Doc. 482, 87th Cong., 2nd 
channel. sess. 
PROVIDENCE RIVER AND HARBOR, R.I. (See Section 23 of Text). 
35-foot channel. Annual Report 1915, 1936, 1938 
H. Doc. 173 75th Cong., 1st 
sess. 
Deepen 35-foot channel to 40 feet. S. Doc. 93, 88th Cong., 2d sess. 
PROVINCETOWN HARBOR, MASS. (See Section 24 of Text). 
Rubblestone protection dike across House Point Island Flats H. Doc. 821, 61st Cong., 2d sess. 
from Stevens Point to Wood End and extension of Long Point 
beach protection. 
Offshore breakwater about 2500 feet long. H. Doc. 600, 80th Cong., 2d sess. 
Mar. 2, 1827 
June 23, 1866 
451-584 0-72-5

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 1-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Sept. 19, 1890 
June 25, 1910 
Mar. 3, 1925 
Aug. 30, 1935 
July 14, 1960 
May 17, 1950 
Mar. 2, 1919 
Aug. 30, 1935 
Aug. 26, 1937 
July 24, 1946 
July 14, 1960, as amended in 1965 
Jetty on north side of mouth of river. 
Channel improvements and jetty extension on south side of 
mouth of river. 
Present project channel dimensions and extension of north 
breakwater about 1,600 feet. 
Extension of north breakwater to Sharps ledge. 
Anchorages and maneuvering basin. 
SCARBORO RIVER, MAINE (See Section 29 of Text). 
Channel across bar 200 feet wide, 8 feet deep; channel 2,400 
feet long, 100 feet deep, leading to an anchorage; and jetty 
800 feet long. 
STAMFORD HARBOR, CONN. (See Section 30 of Text). 
East Branch channel and present project width of entrance 
channel. 
8-foot anchorage area, present project depth of upper portion 
of entrance channel, and present project dimensions of West 
Branch channel and basin. 
Breakwaters, 18-foot anchorage basin, and present project 
depth of outer section of entrance channel. 
Substituted 8-foot anchorage basin adjacent to East Branch 
channel for that in outer harbor. 
STONY CREEK, BRANFORD, CONN. (See Section 31 of Text). 
6-foot entrance channel, 100 feet wide and maneuvering basin. 
WELLFLEET HARBOR, MASS. (See Section 32 of Text). 
Mar. 2, 1945 Channel 10 feet deep, 125 feet wide and anchorage basin. 
S. Ex. Doc. 44, 48th Cong., 1st 
sess., and Annual Report 1884, 
p. 482. 
H. Doc. 752, 61st Cong., 2d sess.4 
H. Doc. 477, 68th Cong., 2d sess. 
Rivers and Harbors Committee Doc. 
11, 74th Cong., 1st sess. 
P.L. 86-645, Sec. 17, as amended 
in 1965, and Chief of Engineers, 
Nov. 14, 1967. 
Chief of Engineers, Mar. 8, 1960 
H. Doc. 69, 81st Cong., 1st 
sess. 
H. Doc. 1130, 63d Cong., 2d sess. 
Rivers and Harbors Comm. Doc. 8, 
74th Cong., 1st sess. 
Rivers and Harbors Comm. Doc. 29, 
75th Cong., 1st sess. 
H. Doc. 675, 79th Cong., 2d sess. 
PL 86-645, Section 107, Chief of 
Engineers Dec. 4, 1967. 
Annual Report 1895, H. Doc. 557, 
76th Cong., 3d sess. 
June 10, 1872 
July 14, 1960, as amended in 1965 
July 13, 189213 
June 3, 1896 
Sept. 3, 195414 
1965 River & Harbor Act. 
WELLS HARBOR, MAINE (See Section 33 of Text). 
Repairs of Old Government pier about 750 feet long; anchorage 
basin; channel 100 to 150 feet wide. 
Two stone jetties. 
WESTPORT HARBOR AND SAUGATUCK RIVER, CONN. (See Sect 
Text). 
Channel. 
Ledge and boulder removal and breakwater repair. 
H. Doc. 202, 86th Cong., 2d sess. 
Chief of Engineers, Sept. 20, 
1965. 
tion 34 of 
H. Ex. 
and A 
840. 
H. Doc 
and A 
806. 
Channel 9 feet deep, 125 feet wide. Anchorage basin 6 feet H. Doc, 
deep. 
WEYMOUTH-FORE AND TOWN RIVERS, BOSTON HARBOR, MASS. (See 
Section 35 of Text). 
Combining Weymouth-Fore & Town Rivers into single project Annual 
and modifies construction of 35-foot deep channel and 1932, 
anchorage. H. Do
179, 51st Cong., 2d sess., 
nnual Report for 1891, p. 
. 67, 54th Cong., 1st sess. 
nnual Report for 1896, p. 
.488, 81st Cong., 2d sess.4 
1 Report for 1907, 1915, 
1938, 1961 pg. 24 & 26 
c. 247, 88th Cong. 2d sess. 
62

TABLE 1-B (Continued) 
NEW ENGLAND DIVISION 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 27, 1965 
Oct. 23, 1962 
July 14, 1960 
Dec. 22, 1944 
Aug. 13, 1968 
Dec. 22, 1944 
Sept. 3, 1954 
Aug. 18, 1941 
Aug. 13, 1968 
June 22, 1936 
June 28, 1938 
July 14, 1960 
July 14, 1960 
July 14, 1960 
June 30, 1948 
June 22, 1936 
June 28, 1938 
Aug. 18, 1941 
June 22, 1936 
H. Doc. 228, 89th Cong., 1st sess. 
Authorized by Chief of Engineers 
April 7, 1967, in accordance 
with Section 103 of 1962 River 
and Harbor Act. 
S. Doc. 87, 85th Cong., 2d sess. 
H. Doc. 624, 78th Cong., 2d sess. 
H. Doc. 370, 90th Cong., 2d sess. 
CLIFF WALK, NEWPORT, R.I. (See Section 40 of Text). 
Improvements for shore protection along the cliff walk. 
OAK BLUFFS TOWN BEACH, MASS. (See Section 41 of Text). 
Widening 1,200 feet of beach and construction of 530-foot long 
groin at southern extremity. 
LOWER WOONSOCKET, R.I. (See Section 45A of Text). 
Three independent flood protection units on Blackstone 
and Mill Rivers. 
WEST HILL DAM, MASS. (See Section 45B of Text). 
Construction of flood control dam on West River, Mass. 
CHARLES RIVER LOCKS AND DAM, MASS. (See Section 46 of 
Text). 
Flood control dam and navigation locks on Charles River. 
BALL MOUNTAIN LAKE, VT. (See Section 47A of Text). 
Construction of dam on West River, Vt. 29 miles above 
junction with Connecticut River. 
System of 3 reservoirs on West River, including Ball 
Mountain. 
BARRE FALLS DAM, MASS. (See Section 47B of Text). 
Construction of flood control dam on Ware River in Barre, Mass. 
BEAVER BROOK LAKE, N.H. (See Section 47C of Text). 
Construction or multi-purpose dam on Beaver Brook. 
BIRCH HILL DAM, MASS. (See Section 47D of Text). 
General comprehensive plan for flood protection in Conn. River 
Valley. 
Construction of flood control dam on Millers River. 
CHICOPEE FALLS, MASS. (See Section 47E of Text). 
Flood protection along Chicopee River. 
COLEBROOK RIVER LAKE, CONN. (See Section 47F of Text). 
Construction of multi-purpose dam on West Branch Farmington 
River. 
CONANT BROOK DAM, MASS. (See Section 47G of Text). 
Construction of flood control dam on Conant Brook. 
GARDNER, MASS. (See Section 47H of Text). 
Construction of flood protection (dam and dikes) along 
Mahoney and Greenwood Brooks. 
GAYSVILLE LAKE, VT. (See Section 471 of Text). 
Construction of multi-purpose dam on White River. 
Comprehensive plan for Conn. River Valley protection. 
Modification of earlier Acts. 
KNIGHTVILLE DAM, MASS. (See Section 47J of Text). 
Comprehensive plan for Conn. River Valley. 
63 
H. Doc. 724, 76th Cong., 3d 
sess. 
S. Doc. 68, 90th Cong., 2d sess. 
H. Doc. 412, 74th Cong., 2d 
sess. 
H. Doc. 455, 75th Cong., 2d sess. 
H. Doc. 434, 86th Cong., 2d sess. 
H. Doc. 443, 86th Cong., 2d sess. 
H. Doc. 434, 86th Cong., 2d sess. 
P.L. 80-858, Sec. 205, as amended, 
and Chief of Engineers June 26, 
1963. 
H. Doc. 412, 74th Cong., 2d sess. 
H. Doc. 455, 75th Cong., 2d sess. 
H. Doc. 724, 76th Cong., 3d sess. 
H. Doc. 412, 74th Cong., 2d sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 1-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Construction of flood control dam on Westfield River. 
LITTLEVILLE LAKE, MASS. (See Section 47K of Text). 
Construction of multi-purpose dam on Westfield River. 
MAD RIVER LAKE, CONN. (See Section 47L of Text). 
Construction of dam on Mad River. 
NORTH HARTLAND LAKE, VT. (See Section 47M of Text). 
Construction of dam on Ottauquechee River. 
Modification of 1938 Act. 
NORTH SPRINGFIELD LAKE, VT. (See Section 47N of Text). 
Construction of dam on Black River. 
Modification of 1938 Act. 
H. Doc. 455, 75th Cong., 2d sess. 
S. Doc. 17, 85th Cong. 
H. Doc. 137, 85th Cong., 1st sess. 
H. Doc. 455, 75th Cong., 2d sess. 
H. Doc. 724, 76th Cong., 3d sess. 
H. Doc. 455, 75th Cong., 2d sess. 
H. Doc. 724, 76th Cong., 3d sess. 
OTTER BROOK LAKE, N.H. (See Section 470 of Text). 
Sept. 3, 1954 Construction of flood control dam on Otter Brook. 
SUCKER BROOK DAM, CONN. (See Section 47P of Text). 
Construction of flood control dam on Sucker Brook. 
SURRY MOUNTAIN LAKE, N.H. (See Section 47Q of Text). 
Comprehensive plan for Conn. River. Valley. 
Construction of flood control dam on Ashuelot River, 
(modification of 1936 Act). 
THREE RIVERS, MASS. (See Section 47R of Text). 
Local flood protection at confluence of Quaboag, Ware and 
Chicopee Rivers. 
TOWNSHEND LAKE, VT. (See Section 47S of Text). 
Construction of dam on West River 19 miles above junction 
with Connecticut River. 
System of 3 reservoirs on West River, including Townshend. 
TULLY LAKE, MASS. (See Section 47T of Text). 
Comprehensive plan for Conn. River flood control. 
Construction of flood control dam on East Branch of Tully River 
(modification of 1936 Act). 
UNION VILLAGE DAM, VT. (See Section 47U of Text). 
Construction of flood control dam on Ompompanoosuc River (part 
of Conn. River Valley plan). 
Modification of 1936 Act. 
WHITE RIVER, HARTFORD, VT. (Se Section 47V of Text). 
Local flood protection along White River at confluence with 
Connecticut River. 
FOX POINT BARRIER, R.I. (See Section 48 of Text). 
Construction of concrete hurricane barrier across Providence 
River at Fox Point in City of Providence. 
ANSONIA-DERBY, CONN. (See Section 49A of Text). 
Flood protection (dikes, floodwalls, channel improvement) 
along Naugatuck River in cities of Ansonia and Derby. 
H. Doc. 443, 86th Cong., 2d sess. 
H. Doc. 412, 74th Cong., 2d sess. 
H. Doc. 455, 75th Cong., 2d sess. 
H. Doc. 434, 86th Cong., 2d sess. 
H. Doc. 412, 74th Cong., 2d sess. 
H. Doc. 455, 75th Cong., 2d sess. 
H. Doc. 412, 74th Cong., 2d sess. 
H. Doc. 455, 75th Cong., 2d sess. 
P.L 80-858, Sec. 205, as amended, 
and Chief of Engineers, Sept. 
23, 1968. 
H. Doc. 230, 85th Cong., 1st sess. 
H. Doc. 437, 87th Cong., 2d sess. 
64 
June 28, 1938 
July 3, 1958 
July 3, 1958 
June 28, 1938 
Aug. 18, 1941 
June 28, 1938 
Aug. 18, 1941 
July 14, 1960 
June 22, 1936 
June 28, 1938 
July 14, 1960 
Dec. 22, 1944 
Sept. 3, 1954 
June 22, 1936 
June 28, 1938 
June 22, 1936 
June 28, 1938 
June 30, 1948 
July 3, 1958 
July 14, 1960

NEW ENGLAND DIVISION 
TABLE 1-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 14, 1960 
Oct. 27, 1965 
Oct. 27, 1965 
July 3, 1958 
July 3, 1958 
July 14, 1960 
July 14, 1960 
July 14, 1960 
Dec. 22, 1944 
Nov. 7, 1966 
June 22, 1936 
June 28, 1938 
June 22, 1936 
June 28, 1938 
June 28, 1938 
Nov. 7, 1966 
Nov. 7, 1966 
65 
BLACK ROCK LAKE, CONN. (See Section 49B of Text). 
Construction of flood control dam on Branch Brook. H. Doc. 372, 86th Cong., 2d sess. 
DANBURY, CONN. (See Section 49C of Text). 
Flood protection (channel improvement) along Still River in H. Doc. 324, 88th Cong., 2d sess. 
city of Danbury. 
DERBY, CONN. (See Section 49D of Text). 
Flood protection (levees and floodwalls) along Naugatuck and H. Doc. 324, 88th Cong., 2d sess. 
Housatonic Rivers at their confluence in city of Derby. 
EAST BRANCH DAM, CONN. (See Section 49E of Text). 
Construction of flood control dam on East Branch of Naugatuck H. Doc. 81, 85th Cong., 1st sess. 
River in Torrington. 
HALL MEADOW BROOK DAM, CONN. (See Section 49F of Text). 
Construction of flood control dam on Hall Meadow Brook in H. Doc. 81, 85th Cong., 1st sess. 
Torrington. 
HANCOCK BROOK LAKE, CONN. (See Section 49G of Text). 
Construction of flood control dam on Hancock Brook in town of H. Doc. 372, 86th Cong., 2d sess. 
Plymouth. 
HOP BROOK LAKE, CONN. (See Section 49H of Text). 
Construction of flood control dam on Hop Brook in city of H. Doc. 372, 86th Cong., 2d sess. 
Waterbury, towns of Middlebury and Naugatuck. 
NORTHFIELD BROOK LAKE, CONN. (See Section 491 of Text). 
Construction of flood control dam on Northfield Brook in town H. Doc. 372, 86th Cong., 2d sess. 
of Thomaston. 
THOMASTON DAM, CONN. (See Section 49J of Text). 
Construction of flood control dam on Naugatuck River in town H. Doc. 338, 77th Cong., 1st sess. 
of Thomaston. 
BAKER BROOK, MASS. (See Section 50A of Text). 
Flood protection (channel improvement) along Baker Brook in S. Doc. 113, 89th Cong., 2d sess. 
Fitchburg and Lunenburg. 
BLACKWATER DAM, N.H. (See Section 50B of Text). 
System of flood control dams in Merrimack River Basin, 
including dam on Blackwater River. 
Modification of 1936 Act. H. Doc. 689, 75th Cong., 3d sess. 
EDWARD MACDOWELL DAM, N.H. (See Section 50C of Text). 
System of flood control dams in Merrimack River Basin, 
including dam on Nubanusit Brook in West Peterborough. 
Modification of 1936 Act. H. Doc. 689, 75th Cong., 3d sess. 
HOPKINTON-EVERETT LAKES, N.H. (See Section 50E of Text). 
Modification of 1936 Act (Merrimack River Basin) to include H. Doc. 689, 75th Cong., 3d sess. 
flood control dams on the Contoocook and Piscataquog Rivers. 
NOOKAGEE LAKE, MASS. (See Section 50F of Text). 
Multi-purpose dam on Phillips Brook in Westminster. S. Doc. 113, 89th Cong., 2d sess. 
WHITMANVILLE LAKE, MASS. (See Section 50G of Text). 
Multi-purpose dam on Whitman River in Westminster. S. Doc. 113, 89th Cong., 2d sess. 
NEW BEDFORD, FAIRHAVEN AND ACUSHNET, MASS. (See Section 51 
of Text). 
July 3, 1958 Hurricane barriers in New Bedford Harbor. S. Doc. 59, 85th Cong.,lst sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 1-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 23, 1962 
July 14, 1960 
Oct. 27, 1965 
Aug. 18, 1941 
Aug. 18, 1941 
Aug. 18, 1941 
Aug. 18, 1941 
July 14, 1960 
Aug. 18, 1941 
NEW LONDON, CONN. (See Section 52 of Text). 
Hurricane barriers protecting city of New London from tidal 
damage. 
STAMFORD, CONN. (See Section 53 of Text). 
Hurricane barriers protecting areas of Stamford from tidal 
damage. 
STRATFORD, CONN. (See Section 54 of Text). 
Hurricane dikes protecting areas of Stratford from tidal 
flooding. 
BUFFUMVILLE LAKE, MASS. (See Section 55A of Text). 
Flood control dam on Little River as part of flood control 
system in Thames River Basin. 
EAST BRIMFIELD LAKE, MASS. (See Section 55B of Text). 
Flood control dam on Quinebaug River as part of flood control 
system in Thames River Basin. 
HODGES VILLAGE DAM, MASS. (See Section 55C of Text). 
Flood control dam on French River in Oxford as part of flood 
control system in Thames River Basin. 
MANSFIELD HOLLOW LAKE, MASS. (See Section 55D of Text). 
Flood control dam on Natchaug River in Mansfield Hollow as part 
of flood control system in Thames River Basin. 
WEST THOMPSON LAKE, CONN. (See Section 55E of Text). 
Flood control dam on Quinebaug River in Thompson. 
WESTVILLE LAKE, MASS. (See Section 55F of Text). 
Flood control dam on Quinebaug River in towns of Sturbridge 
and Southbridge as part of flood control system in Thames 
River Basin. 
TRUMBULL POND LAKE, CONN. (See Section 56 of Text). 
Multi-purpose dam on Pequonnock River in town of Trumbull. 
1. Contains latest published maps. See also Annual Report, 
1911, p. 1178 (seawalls and Nixes Mate Channel) and Annual 
Report, 1903, p. 770 (Fort Point Channel). 
2. Authorized in part by Public Works Administration, Sept. 
6, 1933. 
3. A portion deferred for restudy. 
4. Contains latest maps. 
5. Inactive. 
6. Rock removal at Hog Island Shoal inactive. 
7. Also Public Works Administration, Sept. 6, 1933. 
8. Quinnipiac River 22-foot channel and turning basin 
deferred for restudy. 
9. 15- and 12-foot channel and basin inactive. 
10. Removal of one ledge inactive. 
11. The 300-foot extension of Long Point beach protection 
portion is inactive. 
12. Upper end of Westport inactive. 
66 
H. Doc. 478, 87th Cong., 2d sess. 
H. Doc. 210, 86th Cong., 1st sess. 
H. Doc. 292, 88th Cong., 2d sess. 
H. Doc. 885, 76th Cong., 3d sess. 
H. Doc. 885, 76th Cong., 3d sess. 
H. Doc. 885, 76th Cong., 3d sess. 
H. Doc. 885, 76th Cong., 3d sess. 
S. Doc. 41, 86th Cong., 1st sess. 
H. Doc. 885, 76th Cong., 3d sess. 
Nov. 7, 1966 S. Doc. 115, 89th Cong., 2d sess.

NEW ENGLAND DIVISION 
TABLE 1-C 
BOSTON HARBOR, MASS. 
TOTAL FEDERAL COST FOR EXISTING PROJECT TO 30 JUNE 1970 
(See Section 2 of Text) 
Funds New Work Maintenance Total 
Regular $21,881,851 $5,783,162 $27,665,013 
Public Works 1,030,806 - 1,030,806 
Emergency relief 935,303 - 935,303 
$23,847,960 $5,783,1621 $29,631,122 
1 Excludes $17,767 contributed funds. 
TABLE 1-D RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 36 of Text) 
Project Date Survey Project Date Survey 
Conducted Conducted 
Connecticut Maine (Continued) 
Branford Harbor Aug 1969 Moosabec Bar Sep 1968 
Bridgeport Harbor Jun 1970 Portland Harbor Jan 1970 
Clinton Harbor Aug 1969 Rockland Harbor Feb 1969 
Connecticut River Jun 1970 Wood Island Harbor Jan 1969 
Below Hartford York Harbor Jan 1970 
New Haven 
35' Channel Mar 1970 Massachusetts 
16' Anchorage Aug 1969 Boston Harbor May 1970 
West River Jun 1970 Fall River Harbor Jun 1970 
New London Harbor Sep 1969 Little Harbor Sep 1969 
Southport Harbor Aug 1969 Menemsha Creek May 1970 
Thames River May 1970 Mystic River Aug 1969 
New Bedford Harbor Oct 1969 
Maine Weymouth Back River Apr 1969 
Beals Harbor Sep 1968 Woods Hole Channel Sep 1969 
Boothbay Harbor Oct 1969 
Bunker Harbor Jun 1970 Rhode Island 
Cape Porpoise Harbor Nov 1968 Block Island, Great Salt Pond Jan 1970 
Corea Harbor Aug 1969 Little Narragansett Bay Jun 1970 
Harraseeket River Dec 1968 
Josias River Oct 1969 
67

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 37 of Text) 
Name of Project 
Apponaug Cove, R. I. 1 
Bagaduce River, Me. ' 4, s 
Bar Harbor, Me.5 
Bass Harbor, Me.6 
Bass Harbor Bar, Me.1 
Beals Harbor, Me.1 
Belfast Harbor, Me.1 
Bellamy River, N. H.1' 3'4 
Beverly Harbor, Mass.1 
Boothbay Harbor, Me 1' 4 
Branford Harbor, Conn.1 
Bridgeport Harbor, Conn.5 
' 7 
Bristol Harbor, R. I. 
Bucksport Harbor, Me.1 
Bullocks Point Cove, R. I.1 
Bunker Harbor, Me. 1' 6 
Buttermilk Bay Channel, Mass.1 
Camden Harbor, Me. 1 
Canapitsit Channel, Mass.
1' 4 
Cape Porpoise Harbor, Me.1 
Carvers Harbor, Vinalhaven, Me. 1 
Cathance River, Me. ' 3, 4 
Clinton Harbor, Conn.1 
Coasters Island Harbor, R. I.1,4 
Cobscook Bay, Me.1' 3,4 
Cocheco River, N. H.1' 3,4 
Connecticut River (above Hartford), 
Conn.8 
' 9 
Corea Harbor, Me. 1 
Cotuit Harbor, Mass. 8 
Criehaven Harbor, Me.1 
Cross Riq Shoals, Nantucket Sound, 
Mass. 
Cuttyhunk Harbor, Mass. 1 
Damariscotta River, Me.1 4 
Deer Island Thoroughfare, Me. 1' 4 
Dorchester Bay and Neponset River, 
Mass. 11 
Duck Island Harbor, Conn.1 
Duxbury Harbor, Mass. 
East Boothbay Harbor, Me. 1 
Eastport Harbor, Me. 1 
Edgartown Harbor, Mass.1 
Essex River, Mass. 1 
For Last 
Full Report 
See Annual 
Report for 
1964 
1912 
1932 
1965 
1920 
1959 
1969 
1897 
1951 
1953 
1967 
1968 
1969 
1907 
1960 
1969 
1960 
1960 
1899 
1954 
1964 
1884 
1965 
1911 
1866 
1913 
1932 
1954 
1962 
1939 
1954 
1966 
1906 
1916 
1968 
1953 
1969 
1953 
1964 
1943 
1948 
31,707 
8,541 
40,776 
24,200 
27,167 
5,000 
40,000 
94,584 
367,298 
384,29712 
6,500 
638,675 
15,614 
21,759 
Cost to June 30, 1970 
Operation and 
Construction Maintenance 
$ 156,8742 $ 4,179 
28,000 39 
406,591 2,187 
188,859 5,330 
4,076 5,516 
184,880 3,801 
39,561 19,324 
34,643 
197,565 6,000 
18,000 5,369 
9,537 503,159 
4,112,669 1,448,063 
18,421 2,555 
170,902 6,705 
95,372 5,782 
31,676 37,616 
72,400 109,650 
9,113 1,334 
175,037 10,142 
147,438 112 
21,000 
72,405 253,256 
5,500 13,161 
4,173 
119,089 24,694 
59,516 
8,125 
54,328 
733,276 
905 
245,363 
353,094 
169,345 
17,238 
2,113 
3,738 
64,61614 
11,643 
10,000 
68 
TABLE 1-E 
Contributed 
Funds Expended 
(Construction) 
100,000 
147,887 
123,757 
20,000 
6,600

NEW ENGLAND DIVISION 
OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 37 of Text) 
For Last Cost to June 30, 1970 Contributed 
Name of Project Full Report Funds Expended 
See Annual Construction Operation and (Construction) 
Report for Maintenance 
Exeter River, N. H. 1,4 1913 $ 27,454 $ 3,032 $ - 
Falmouth Harbor, Mass.1 1965 123,763 27,568 35,000 
Fivemile River Harbor, Conn. 5 1969 35,490 122,803 
Georges River, Me. 1' 15 1935 25,788 42,534 
Great Salt Pond, Block Island, R. I. 5 1963 189,037 122,690 
Greenwich Bay, R. I.1 1893 2,000 50 
Greenwich Harbor, Conn.1 1969 181,741 146,789 100,000 
Guilford Harbor, Conn.1 1965 137,222 131,731 25,500 
Harbor of Refuge, Pt. Judith, R. I.1 1969 2,488,43016 1,203,979 17,587 
Harraseecket River, Me. 1'4 1896 30,963 5,309 
Hay (West Harbor), Fisher's Island, N.Y. 1 1931 8,401 1,870 
Hendrick's Harbor, Me.1 1957 28,204 
Hingham Harbor, Mass.1 1954 19,000 57,948 
Hyannis Harbor, Mass. 1 1966 484,49917 116,336 103,001 
Ipswich River, Mass 1969 5,618 2,166 
Isle au Haut Thoroughfare, Me.1 1959 137,653 966 
Isle of Shoals Harbor, Me. and N.H. 1 1969 39,238 78,440 
Josias River, Me. 1 1967 115,565 36,002 26,813 
Kennebec River, Me.5 1969 1,090,529 685,308 
Kingston Harbor (North Plymouth), 
Mass.' 1895 8,940 - 
Lamprey River, N. H. 1' 4 1913 19,980 10,221 
Little Harbor, N. H.1' 4, 18 1909 133,227 5,659 
Little Harbor, Woods Hole, Mass. 1',4 1906 18,000 2,648 
Lubec Channel, Me.1 1956 211,367 13,583 
Lynn Harbor, Mass.19 1956 533 112 
Machias River, Me.1 1966 32,000 35,639 
Malden River, Mass. 1' 20 1922 79,866 333 62,000 
Manchester Harbor, Mass.8 1949 - - - 
Marblehead Harbor, Mass.8 1968 43,711 
Matinicus Harbor, Me.1 1962 14,00021 8,989 
Mattapoisett Harbor, Mass. 8 1950 - - - 
Medomak River, Me.1 1953 17,000 92,359 
Merrimack River, Mass.1 1940 115,425 158,224 
Mianus River, Conn.1 1964 132,435 61,484 46,500 
Milford Harbor, Conn.22 1968 48,166 273,596 11,380 
Moosabec Bar, Me.1 1930 114,000 16,780 
Mystic River, Conn.5 1957 160,982 79,892 14,000 
Mystic River, Mass.1 1967 3,097,054 699,179 
Nantucket (Harbor of Refuge), 
Mass.5 1965 456,4822 389,489 
Narragaugus River, Me1 1969 749,500 
New Bedford and Fairhaven 
Harbor, Mass.5 1953 1,686,918 656,940 20,385 
69

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 1-E (Continued) 
OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 37 of Text) 
Name of Project 
Cost to June 30, 1970 
Construction Operation and 
Maintenance 
$ 118,6202 $ 21,705 
1,242,246 40,254 
567,974 243,457 
498,828 39,601 
138,942 3,299 
124,158 219 
New Harbor, Me. 1 
New Haven Breakwater, Conn.1 
New London Harbor, Conn.1 
Newport Harbor, R. I. 
Northeast Harbor, Me. 1 
Owls Head Harbor, Me. 2 
Passamaq oddy Tidal Power Project, 
Maine 
Patchogue River, Conn.
1 
Pawcatuck River, R.I. and Conn. s 
Pawtuxet Cove, R. I.1 
Penobscot River, Me.1 
Pepperell Cove, Me. 5 
Pig Island Gut, Me.1' 6 
Pleasant River, Me.1 ' 4 
Pollock Rip Shoals, Nantucket 
Sound, Mass. 1 
Potowomut River, R. I. 1,4 
Richmond Harbor, Me. 1'4 
Richmond's Island Harbor, Me. 1'4 
Rockland Harbor, Me. 
Rockport Harbor, Me. 1' 3 
Rye Harbor, N. H. 1 
St. Croix River, Me. 1 
Sakonnet Harbor, R.I. 1 
Sakonnet River, R. I.1' 29 
Salem Harbor, Mass. s 
Sandy Bay (Harbor of Refuge), 
Cape Ann, Mass. 
Sasanoa River, Me. 1' 3,4 
Scituate Harbor, Mass.1 
Searsport Harbor, Me.1 
Seekonk River, R. I.1 
South Bristol Harbor, Me.1 
Southport Harbor, Conn.1 
Southwest Harbor, Me. 1 
Stockton Harbor, Me. 1' A 4 
Stonington Harbor, Conn.5 
Stonington Harbor, Me. 
Sullivan Falls Harbor, Me.1 
Taunton River, Mass.5 
Tenanta Harbor, Me. 1 
Thames River, Conn. s 
Union River, Me. 3 ' 15 
Contributed 
Funds Expended 
(Construction) 
$ 7,015 
4,383 
- 
100,000 
20,000 
295,356 
For Last 
Full Report 
See Annual 
Report for 
1966 
1950 
1954 
1953 
1954 
1968 
1935 
1963 
1963 
1967 
1969 
1969 
1966 
1892 
1956 
1882 
1883 
1882 
1960 
1915 
1965 
1950 
1962 
1909 
1969 
1922 
1915 
1960 
1966 
1954 
1963 
1962 
1962 
1915 
1959 
1961 
1914 
1948 
1920 
1967 
1912 
70 
55,004 
350,075 
3,796 
538,275 
1,757 
994 
217 
846,590 
50 
1,808 
11,979 
1,079 
14,004 
26,332 
1,559 
242,454 
15,926 
124 
19,013 
785,194 
1,648 
178,114 
1,041 
7,167 
47,407 
86 
3,227 
1,250,934 
17,344 
6,384,394 
150,000 
185,430 
295,356 
292,020 
171,351 
191,753 
3,500 
1,083,504 
5,000 
20,000 
119,844 
1,948,462 
32,000 
130,342" 
179,550 
588,478 
38,427 
1,640,833 
1,925,553 
35,000 
284,760 
5.72,56831 
337,789 
89,593 
37,71432 
180,042 
33,000 
39,874 
2,543 
19,871 
271,396 
18,750 
1,323,571 
146,855 
61,338 
19,892 
21,928 
69,976 
67,792 
2,663 
18,525 
7,501

NEW ENGLAND DIVISION 
TABLE 1-E (Continued) 
OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 37 of Text) 
For Last 
Full Report Cost to June 30, 1970 Contributed 
Name of Project See Annual Operation and Funds Expended 
Report for Construction Maintenance (Construction) 
Vineyard Haven, Mass.1 1943 $ 27,186 $ 2,578 $ - 
Wareham Harbor, Mass.5 
Warren River, R. I.1 
Warwick Cove, R. I.6 
Westcott Cove, Conn.1 
Westport River, Mass. 34 
Weymouth Back River, Mass. 1 
Wickford Harbor, R. I.1,' 35 
Wilson Point Harbor, Conn. 
1' 4 
Winnipesaukee ,Lake, N. H.1 
Winthrop Harbor, Mass. 1 
Wood Island Harbor, Me., and Pool 
at Biddeford, Me. 
Woods Hole Channel, Mass. 1 
York Harbor, Me.1 
1896 
1890 
1968 
1964 
1942 
1944 
1967 
1895 
1952 
1895 
1957 
1940 
1962 
95,997 
5,000 
155,430 
55,960 
48,740 
217,110 
54,177 
7,500 
8,992 
135,612 
230,000 
195,654 
258 
30,132 
3,860 
50,374 
29,870 
3,394 
1,372 
10,868 
29,081 
133,985 
21,000 
20,000 
49,094 
12,000 
32,161 
1. Completed. 
2. Excludes costs of $137,583 for local cooperation requirements, 
which includes $104,583 cash contribution. 
3. Abandonment recommended in H. Doc. 467, 69th Congress., 
1st sess. 
4. No commerce reported. 
5. Completed except for inactive portion. 
6. Authorized by the Chief of Engineers (P.L. 86-645, Sec. 107). 
7. There is no reasonable prospect that required local cooperation 
will be forthcoming for Black Rock Harbor breakwaters and Burr and 
Cedar Creek anchorage. 
8. Inactive. 
9. Estimated cost of project $12,900,000; expenditures limited by 
law to $1 million. 
10. Excludes $50,000 contributed funds expended 
11. Authorized work remaining on project is comprised of an incomplete 
and inactive portion. 
12. Excludes local cooperation requirements of $100,000, consisting 
of $35,000 cash contribution, $13,000 for public wharf, and $52,000 
for additional construction costs. 
13. Excludes $141,530 contributed funds "other" expended. 
14. Excludes $5,000 contributed funds expended. 
15. Improvement adequate for commerce. 
16. Excludes $1,926,000 Federal funds for rehabilitation. 
17. Excludes $129,757 expended for rehabilitation; breakwater repaired 
in 1961. 
18. H. Doc. 467, 69th Cong., 1st sess., recommended eliminating 
maintenance dredging. 
19. Improvement to be restudied. 
20. Under State maintenance. 
21. Excludes $114,327 expended for rehabilitation; breakwater repaired 
in 1962. 
22. Remaining work is comprised of an inactive portion and a portion 
authorized by P.L. 86-645, Sec. 107. 
23. Excludes $211,649 expended for rehabilitation; jetty repaired in 1963. 
24. All assurances of local cooperation have not been fulfilled. Public landing 
at Back Cove has not been constructed. Portion of project authorized by 
Chief of Engineers (Public Law 96-645, Sec. 107). 
25. Recommendation for abandonment of existing project made in H.D. 467, 
69th Cong., 1st sess. Portion of project authorized by the Chief of Engineers 
(P.L. 86-645, Sec. 107) is complete. 
26. Work discontinued in 1937. Facilities transferred to War Assets Administration. 
27. Excludes about $225,000 expended by local interests in terminal and 
transfer facilities. Authorized work remaining on project is comprised of an incomplete 
and an inactive portion. 
28. Excludes $81,548 contributed funds "other" expended. 
29. Commerce included under Tiverton Harbor, R. I. 
30. Abandonment recommended in H. Doc. 411, 64th Cong., 1st sess., and 
in River and Harbor Committee Doc. 3, 65th Cong., 1st sess. 
31. Costs to local interests for berth improvements are estimated to be $60,000. 
32. Includes $37,714 emergency relief funds. Excludes $18,525 contributed 
funds, of which $1,785 was for work outside approved project. 
33. Town of Stonington voted March 6, 1961 not to participate in project. 
Project is inactive. 
34. Awaiting local cooperation. Improvement to be restudied. 
35. Portion of project authorized by Chief of Engineers (Public Law 86-645, 
Sec. 107). All assurances of local cooperation have not been fulfilled. Construction 
of public landing is in progress. 
71

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
NAVIGATION ACTIVITIES PURSUANT TO SECTION 107, 
PUBLIC LAW 86-645 (PREAUTHORIZATION) 
(See Section 38 of Text) 
Fiscal Year 
Study Identification Cost 
Blue Hill Harbor, Me. $16,529 
Bucks Harbor, Machiasport, Me. 17,439 
Five Mile River, Conn. (Norwalk and Darien) 1,855 
Great Chebeague Island, Cumberland, Me. 1,187 
Scituate Harbor, Mass. 28,195 
Sesuit Harbor, Dennis, Mass. 3,421 
Winter Harbor, Me. 2,137 
TABLE 1-G OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
(See Section 43 of Text) 
For Last 
Full Report Cost to June 30, 1970 
See Annual Amount Expended 
Report For Construction by Local Interests 
Brant Rock Beach, Marshfield, Mass. 1961 $ - $ 
Burial Hill Beach, Westport, Conn.1 1958 5,810 11,620 
Calf Pasture Beach Park, Norwalk, Conn.1 1964 56,386 120,179 
Clark Point, New Bedford, Mass. 1963 
Compo Beach, Westport, Conn.1 1962 83,544 168,089 
Cove Island, Stamford, Conn.1 1961 47,131 95,762 
Cummings Park, Stamford, Conn.1 1963 26,886 53,771 
Greenwich Point Park, Conn. 1959 
Guilford Point Beach (Jacobs Beach), Guilford, Conn.1 1961 15,620 31,941 
Gulf Beach, Milford, Conn.1 1958 21,303 42,606 
Hammonasset Beach, Madison, Conn.1 1956 163,183 326,366 
Hampton Beach, Hampton, N.H. 1 1966 260,868 136,095 
Jennings Beach, Fairfield, Conn.1 1956 14,401 28,802 
Lighthouse Point Park (area 9), Conn.1 1961 3,930 7,735 
Lynn-Nahant Beach, Mass. 
Matunuck Beach, South Kingston, R.I.2 1961 
Middle Beach, Conn.1 1958 8,810 17,620 
Misquamicut Beach, Westerly, RI. 1963 14,512 29,024 
Napatree Beach, RII. 
Narragansett Pier, RI. 
North Hampton Beach, North Hampton, N. H. 1963 
North Scituate Beach, Scituate, Mass. 1969 106,552 106,000 
Prospect Beach, West Haven, Conn. 1958 104,573 240,819 
Provincetown Beach, Provincetown, Mass. 1961 
Quincy Shore Beach, Quincy, Mass. 1962 621,464 1,242,880 
Revere Beach, Mass. 1957 73,800 142,965 
Sand Hill Cove Beach, R.I.1 1959 40,143 82,000 
Sasco Hill Beach, Fairfield, Conn.1 1961 23,759 46,518 
Seaside Park, Conn.1 1958 150,000 329,921 
Sherwood Island State Park, Conn.1 1959 186,830 372,802 
Short Beach, Conn.1 5 
Silver Beach to Cedar Beach, Conn. 1964 62,560 270,695 
Southport Beach, Conn.1 1960 17,631 35,263 
Thumpertown Beach, Eastham, Mass. 1961 
Town Beach, Plymouth, Mass. 1964 5,490 10,981 
Town Neck Beach, Sandwich, Mass. 1961 
Wallis Sands State Beach, Rye, N.H. 1 1966 65,131 435,942 
Wessagusset Beach, Weymouth, Mass. 1963 19,264 38,528 
Winthrop Beach, Mass. 1960 176,5676 353,134 
Woodmont Shore, Milford, Conn.1 1961 53,838 111,679 
1. Completed. 
2. Project is to be included in Point Judith water resources 
development plan authorized by 1962 River and Harbor Act. 
3. Additional Federal participation will be required based 
on Public Law 87-874. 
4. Project inactive. 
5. Project completed at no cost to Federal Government by using 
fill from Federal navigation improvement at Housatonic River. 
6. Project is 79% complete. In addition to uncompleted work 
there are three additional groins, construction of which is deferred 
until it is determined that they are necessary. 
7. Excludes $118,215 expended for work beyond scope of 
project. 
72 
TABLE 1-F

NEW ENGLAND DIVISION 
TABLE 1-H BEACH EROSION CONTROL WORK UNDER SPECIAL AUTHORIZATION 
(See Section 44 of Text) 
Fiscal Year 
Study Identification Cost 
Plum Island, Massachusetts $ 7,337 
Short Sands, York Beach, Maine 6,630 
BLACKSTONE RIVER BASIN, MASS. AND R. I. 
TABLE 1-I RESERVOIR 
(See Section 45 of Text) 
Miles 
Above Reser- Estimated Federal Cost 
Mouth of Height Name Nearest voir Lands City BBllaacckk-- ((ffeeet)t ) Type Capacity Con- Laanndd s Total 
stone (acre-feet) struction Damages1 
River 
West Hill Worcester, Mass 25.8 51 Earthfill 12,400 $1,440,000 $940,000 $2,380,000 
1Includes highway, railroad, and utility relocations.
LOCAL PROTECTION PROJECTS 
Miles 
Above Estimated Costs 
Mouth of 
Location MBoluatchkB-Llaacnkd- s Type of Structure 
stone Con- aanndd T Total 
River struction Damages 
Worcester, Mass. 48 Diversion tunnel and channel $4,781,000 $1,179,0002 $5,960,000 
Woonsocket, R. I. 15 Channel improvement 3,740,100 1,069,0003 4,809,100 
Lower Woonsocket, R. I. 4 13 Floodwall, conduits and channel 8,150,000 1,000,000 9,150,000 
improvement 
Pawtucket, R. I.S 2 Floodwall 202,000 - 202,000 
IIncludes relocations. 
2$158,000 Federal; $1,021,000 non-Federal. 
4$300,000 Federal; $769,000 non-Federal. 
55See individual report for details. Inactive, cost revised in 1954. 
73

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
CONNECTICUT RIVER BASIN, VT., N. H., MASS., AND CONN. 
(See Section 47 of Text) 
DAMS AND RESERVOIRS 
TABLE 1-J 
Miles Above Estimated Federal Cost 
Mouth of Height Reservoir Las 
Name Nearest City Connecticut (feet) Type Capacity Construction 1 Total 
River (acre-feet)Damag 
Vermont: 
Victory St. Johnsbury 306.0 90 Earthfill 106,000 $ 4,087,000 $ 1,413,000 $ 5,500,000 
South Tunbridge3 Barre 234.5 105 Earthfill 32,600 3,138,000 2,302,000 5,440,000 
Union Village White River Junction 228.4 170 Earthfill 38,000 3,301,700 908,300 4,210,000 
Gaysville 2 Rutland 246.8 192 Earthfill 82,500 13,700,000 15,000,000 28,700,000 
North Hartland2 White River Junction 211.7 185 Earthfill 71,400 6,710,000 950,000 7,660,000 
Ludlow3 Rutland 211.8 118 Earthfill 23,900 2,532,000 3,158,000 5,690,000 
North Sprngfield 2 Springfield 191.3 120 Earthfill 50,600 5,330,000 2,050,000 7,380,000 
Brockway Bellows Falls 182.0 122 Earthfill 37,700 4,801,000 5,899,000 10,700,000 
The Island Brattleboro 189.6 100 Earthfill 19,400 3,670,000 1,110,000 4,780,000 
Cambridgeport Bellows Falls 180.3 101 Earthfill 21,600 4,078,000 1,092,000 5,170,000 
Ball Mountain Brattleboro 178.2 265 Rockfill-earth 54,600 10,185,200 350,000 10,535,200 
Townshend2 Brattleboro 168.3 133 Earthfill 33,200 5,570,000 1,870,000 7,440,000 
New Hampshire: 
Sugar Hill4 Woodsville 280.9 163 Earthfill 91,600 3,500,000 3,385,000 6,885,000 
West Canaan3 Lebanon 233.8 80 Earthfill 51,000 3,471,000 5,589,000 9,060,000 
Claremont9 Claremont 202.4 138 Earthfill 78,400 11,020,000 3,800,000 14,820,000 
Surry Mountain Keene 174.4 86 Earthfill 32,500 2,335,000 385,000 2,720,000 
Otter Brook Keene 171.2 133 Earthfill 18,300 2,881,600 1,378,400 4,260,000 
Beaver Brook Keene 170.7 60 Earthfill 5,750 1,365,000 635,000 2,000,000 
Honey Hill4 Keene 168.9 65 Earthfill 26,200 2,662,000 1,398,000 4,060,000 
Massachusetts: 
Birch Hill2 Gardner 153.3 56 Earthfill 49,900 1,545,000 3,075,000 4,620,000 
Tully2 Athol 148.7 62 Earthfill 22,000 1,183,600 368,000 1,551,600 
Barre Falls Worcester 130.2 62 Rockfill-earth 24,000 1,928,000 39,000 1,967,800 
Knightville 2 Northampton 102.8 160 Earthfill 49,000 2,399,200 821,200 3,220,400 
Littleville Northampton 102.0 150 Earthfill 32,400 5,863,000 1,150,000 7,013,000 
West Brookfield7 Worcester 100.5 30 Earthfill 33,000 3,422,000 5,568,000 8,990,000 
Conant Brook Springfield 122.0 85 Rockfill-earth 3,740 1,935,000 1,015,000 2,950,000 
Connecticut: 
Colebrook River2 Winsted 116.0 223 Rockfill-earth 98,500 8,323,000 5,847,000 14,170,000 
Mad River2 Winsted 120.0 178 Earthfill 9,700 3,230,800 2,210,000 s 5,440,800 
Sucker Brook2 Winsted 118.5 68 Earthfill 1,480 2,390,000 240,0006 2,630,000 
1. Includes highway, railroad, and utility relocation. 5. Non-Federal $670,000; Federal $1,540,000. 
2. For details, see individual report. 6. Non-Federal cost. 
3. Inactive; cost last revised in 1954. 7. Deauthorized by House Document 434, 88th Congress, 2d session. 
4. Alternate site to be selected. Cost has not been revised on current 8. Includes $685,000 non-Federal cost. 
price basis. 9. Classified as inactive Mar. 18, 1968. 
LOCAL PROTECTION PROJECTS 
Miles Above Estimated Cost 
Connecticut Type of Structure Construction ads Total 
River 
Gardner, Mass.3 
Hartford, Vt.3 
Northampton, Mass 
Holyoke, Mass. 
Springdale, Mass. 
Three Rivers, Mass. 3 
Chicopee, Mass. 
Chicopee Falls, Mass. 3 
Westfield, Mass.3 
Riverdale, Mass. 
Springfield, Mass. 
West Springfield, Mass. 
94 
85 
84 
98 
80 
83 
85 
80 
76 
76 
Dam and dikes 
Channel improvement 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
74 
$ 493,900 
334,000 
960,000 
3,418,000 
700,000 
1,580,000 
1,738,000 
2,585,000 
5,382,000 
1,138,000 
932,000 
1,579,0004 
$ 35,000 
150,000 
150,000 
57,000 
700,000 
250,000 
70,000 
1,058,000 
50,000 
272,000 
30,000 
$ 528,900 
334,000 
1,110,000 
3,568,000 
757,000 
2,280,000 
1,988,000 
2,655,000 
6,440,000 
1,188,000 
1,204,000 
1,609,000

TABLE 1-J (Continued) 
NEW ENGLAND DIVISION 
LOCAL PROTECTION PROJECTS 
Miles Above 
Mouth of Estimated Cost 
Location Connecticut Type of Structure Lands and 
RiverConstruction Damages1 Total 
Winsted, Conn. 115 Channel improvement $ 245,500 $ 30,000 $ 275,500 
East Hartford, Conn 52 Wall and levee 2,135,000 270,900 2,405,900 
Hartford, Conn. 52 Wall and levee 6,929,1002 1,149,600 8,078,700 
Park River, Conn. 51 Conduit 41,000,000 1,100,000 42,100,000 
1. To be borne by local interests. Also includes local interests' por- 3. For details, see individual report. 
tion of relocations. 4. Includes $245,000 Public Works Administration funds. 
2. Includes $835,000 Public Works Administration funds. 
HOUSATONIC RIVER BASIN, CONN. 
TABLE 1-K (See Section 49 of Text) 
DAMS AND RESERVOIRS1 
Miles Above 
Mouth of Height Reservoir Estimated Federal Cost 
Name Nearest City Type Capacity Lands and 
River (acre-feet) Damages 
Hall Meadow Torrington, Conn. 41.0 73 Rock and earthfill 8,620 $ 1,841,200 $1,290,0003 $ 3,131,200 
East Branch Torrington, Conn. 43.7 92 Earthfill 4,350 1,433,800 1,290,0003 2,723,800 
Thomaston Torrington, Conn. 30.5 142 Rock and earthfill 42,000 6,380,000 7,900,000 14,280,000 
Northfield Torrington, Conn. 30.6 118 Earthfill 2,432 1,856,000 975,000 2,831,000 
Black Rock Waterbury, Conn. 29.0 154 Earthfill 8,700 5,279,000 2,931,000 8,210,000 
Hancock Brook Waterbury, Conn. 25.0 57 Earthfill 4,030 1,595,000 2,528,000 4,123,000 
Hop Brook Waterbury, Conn. 15.9 97 Earthfill 6,970 2,065,000 3,335,000 5,400,000 
1. For details of projects, see individual reports. 
2. Includes highway, railroad, and utility relocations. 
3. Cost of lands borne by local interests. 
LOCAL PROTECTION PROJECT2 
Miles Above 
Mouth of Estimated Costs 
Location Housatonic Type of Structure Lands and 
River Construction Damages 1 Total 
Ansonia-Derby, Conn. 13.0 Wall, levee, channel improvement and pumping stations $18,000,000 $1,050,000 $19,050,000 
Danbury, Conn. 56.0 Walls, channel improvement and bridge replacement 6,860,000 1,480,000 8,340,000 
Derby, Conn. 12.0 Walls, levees and pumping station 7,650,000 580,000 8,230,000 
1. To be borne by local interests. Includes relocations. 
2. For details of projects, see individual reports. 
75

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
MERRIMACK RIVER BASIN, N. H., AND MASS. 
TABLE 1-L (See Section 50 of Text) 
RESERVOIRS 
Miles Above 
Nearest Mouth of Height Reservoir Estimated Federal Cost 
City Merrimack (feet) Type Capacity Construction Lands Totaandl 
River (acre-feet) Damages 
Franklin Falls2 Franklin, N. H. 118.2 140 Earthfill 154,000 $ 6,330,000 $1,760,000 $ 8,090,000 
Blackwater2 Concord, N. H. 118.8 75 Earthfill 46,000 867,000 553,000 1,420,000 
Hopkinton-Everett 2' 4 Concord, N.H. 87.3 115 Earthfill 157,300 13,133,000 8,737,000 21,870,000 
Edward MacDowell 2 Keene, N. H. 161.3 67 Earthfill 12,800 1,708,300 306,000 2,014,300 
Mountain Brook3 Keene, N. H. 167.8 50 Earthfill 5,300 695,000 79,000 774,000 
Monoosnoc 6 Leominster, Mass. 100.6 71 Earthfill 2,000 2,960,000 320,000 3,280,0005 
Phillips6 Fitchburg, Mass. 105.4 48 Earthfill 1,600 2,760,000 140,000 2,900,000 
Nookagee 2 Fitchburg, Mass. 107.9 106 Earthfill 8,100 6,350,000 1,650,000 8,000,0005 
Whitmanville2 Fitchburg, Mass. 110.6 76 Earthfill 9,350 4,010,000 1,790,000 5,800,0005 
1. Includes highway, railroad, and utility relocations. 
2. For details see individual report. 
3. A dam has been constructed at site by private interests. Cost has not been revised on current price basis. 
4. Substituted for Bennington and Beards Brook. Distance and height are for Everett Dam. Distance and height for Hopkinton Dam are 118 
miles and 76 feet, respectively. 
5. Includes Non-Federal reimbursement. 
6. For last full report, see Annual Report for 1967. 
LOCAL PROTECTION PROJECTS 
Miles Above Estimated Federal Cost 
Location Merrimack Type of Structure Lands nd 
River Construction adsa1 Total 
Nashua, N. H.2 55 Wall and levee $ 270,000 $ 3,000 $ 273,000 
North Andover and Lawrence, Mass.4 27.3 Wall and levee 1,680,000 43,000 1,723,000 
Lowell, Mass.3 39 Wall and levee 490,600 90,000 580,600 
Baker Brook, Mass.6 101.2 Channel improvement 2,110,000 280,000 2,390,000 
Monoosnoc Brook, Mass. s 98.4 Channel improvement 290,000 80,000 370,000 
North Nashua River, Mass. s 100.5 Channel improvement 885,000 - 885,000 
Saxonville, Mass.5 69.0 Wall, levee, channel 1,630,000 240,000 1,870,000 
1. To be borne by local interests. 
2. Completed. For last full report, see Annual Report for 1950. 
3. Completed. For last full report, see Annual Report for 1945. 
4. Cost last revised in 1954; inactive. 
5. For last full report, see Annual Report for 1967. 
6. For details see individual report. 
76

NEW ENGLAND DIVISION 
TABLE l-M 
THAMES RIVER BASIN, CONN., R. I., AND MASS. 
(See Section 55 of Text) 
RESERVOIRS 
MMiloesu tAhb oofv e Height Reservoir Estimated Federal Cost 
Month of Height Reservoi Name Nearest City Thames (feet) Type Capacity Construction Land and Total 
River (acre-feet) Damages 
Hodges Village2 Webster, Mass. 74.5 55 Earthfill 13,000 $1,277,000 $3,144,000 $4,421,000 
Buffumville 2 Webster, Mass 74.4 66 Earthfill 12,700 $2,359,000 841,000 3,200,000 
East Brimfield2 Southbridge, Mass. 82.8 55 Earthfill 30,000 1,590,000 5,720,000 7,310,000 
Westville 2 Southbridge, Mass. 75.2 80 Earthfill 11,000 2,290,000 3,400,000 5,690,000 
West Thompson 2 Putnam, Conn. 59.3 70 Earthfill 25,600 5,010,000 1,860,000 6,845,000 
South Coventry3 Willimantic, Conn. 41.6 94 Earthfill 36,900 4,434,000 5,666,000 10,100,000 
Mansfield Hollow2 Willimantic, Conn. 40.0 70 Earthfill 52,000 4,210,000 2,340,000 6,550,000 
Andover3 Manchester, Conn. 47.0 80 Earthfill 16,800 3,777,000 1,123,000 4,900,000 
1. Includes highway, railroad and utility relocations. 
2. For details, see individual report. 
3. Inactive; cost last revised 1954. 
LOCAL PROTECTION PROJECTS 
Miles Above Estimated Federal Cost 
LocatiLoonc ation ofM Tohuatmh es Type of Structure Land and Type Construction Damages Total 
River Damages 
Norwich, Conn. 15 Channel improvement $1,209,600 $72,000 $1,281,600 
1. Borne by local interests. 
77 
451-584 0-72-6

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 1-N OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Cost to June 1970 
For Last Full 
Report See Contributed 
.Project Annual Report For Construction Funds 
Andover Reservoir, Conn.1 - $ - $ - 
Beards Brook Reservoir, N.H.1 2 1949 78,000 - 
Bennington Reservoir, N.H. 1 '2 1949 205,000 - 
Brockway Reservoir, Vt.i 1946 - - 
Cambridgeport Reservoir, Vt. - - - 
Canton, Mass.4 1964 180,670s 92,891 
Cherryfield, Me. 3 '4 1963 203,000 - 
Chicopee, Mass.6 1954 1,433,6007 385 
Claremont Reservoir, N.H.1 1968 242,700 - 
Clyde, R.L& 1948 8,800 
Cocheco River, N.H.3 1963 183,100 
Dickey-Lincoln School Reservoirs, Me. 1968 2,154,300 - 
East Hartford, Conn.3 1951 2,135,000 7,637 
Hartford, Conn.3 1960 6,094,1009 2,781,100 
Holyoke, Mass.3 1953 3,418,000 24,447 
'Honey Hill Reservoir, N.H. 1 1949 92,000 - 
Huntington, Mass. 3 ' 4 ' 10 1960 3,900 - 
Keene, N.H. 3'4 1955 44,100 
Lowell, Mass.3 1945 490,600 - 
Ludlow Reservoir, Vt.1 - - - 
Monoosnoc Brook, Mass. 1967 - - 
Monoosnoc Reservoir, Mass. 1967 - - 
Mountain Brook Reservoir, N.H."1,1 1949 57,000 - 
Mystic, Conn.1 1968 67,700 - 
Narragansett Pier, R.L1 1966 115,590 - 
Nashua, N.H.3 1950 270,000 327 
North Andover and Lawrence, Mass.1 1949 20,000 - 
North Nashua, Mass. 1967 - - 
Northampton, Mass. 3 1950 960,000 - 
Norwalk, Conn.3 '4 1952 52,150 2,800 
Norwalk-Wilton, Conn. 1969 - - 
Norwich, Conn.3 1960 1,209,000 - 
Park River, Conn. 1969 - - 
Pawcatuck, Conn. 1966 644,311 214,106 
Pawtucket, R. I.1 1949 - - 
Phillips Reservoir, Mass. 1967 - - 
Point Judith, R.I. 1968 198,447 - 
Pontiac Diversion, R.L8 1948 24,200 - 
Riverdale, Mass.3 1952 1,138,000 25,000 
Saxonville, Mass. 1967 - - 
South Coventry Reservoir, Conn.1 1951 96,000 - 
South Tunbridge, Vt.1 - - - 
Springdale, Mass.3 1952 700,000 - 
Springfield, Mass.3 1950 932,000 5,350 
Sugar Hill Reservoir, N.H. 2 1946 - - 
The Island Reservoir, Vt. 13 
Torrington, East Branch, Conn.3 '4 1963 389,200 
Torrington, West Branch, Conn.3 '4 1963 228,300 
78

NEW ENGLAND DIVISION 
TABLE 1-N (Continued) OTHER AUTHORIZED FLOOD CONTROL PROJECTS
Cost to June 30, 1970 
For Last Full 
Report See Contributed 
Project Annual Report For- Construction Funds 
Victory Reservoir, Vt.14 1967 $ 168,400 $ - 
Wareham Marion, Mass. 1 1965 81,715 
Ware, Mass. 3 '4 1963 400,000 
Waterbury-Watertown, Conn.3 '4 1963 263,300 
West Brookfield Reservoir, Mass.15 1948 67,000 - 
West Canaan Reservoir, N.H.1 1948 92,000 
Westfield, Mass.1 1967 507,200 
Westerly, R.I. 1966 
Weston, Vt.3 '4 1957 13,000 1,800 
Westport, Conn.1 1965 29,634 - 
West Springfield, Mass.3 1954 1,334,00016 
West Warren, Mass. 3 '4 1964 389,200 41,000 
Williamsville Reservoir, Vt. 1' 1 7 1949 146,500 
Winsted, Conn.3 1954 245,500 - 
Woonsocket, R.I.3 1962 4,040,000 224,500 
Worcester Diversion, Mass.3 1962 4,939,500 79,300 
1. Inactive. 10. Emergency Bank Protection. 
2. Hopkinton-Everett substituted for Beards Brook and 11. A dam was constructed at site by private interests. 
Bennington. 12. Alternate site to be selected. 
3. Completed. 13. To be restudied. 
4. Authorized by Chief of Engineers. 14. Restudy completed. Survey Report being processed for 
5. Reflects FY 1967 settlement of outstanding claim. Congressional authorization due to change in project scope. 
6. Completed except for inactive portion. 15. Deauthorized by House Document 424, 88th Congress, 
7. Includes $295,000 Public Works Administration funds. 2nd session. 
8. Authorization expired due to failure of local interest to 16. Excludes $245,000 public works funds. 
furnish assurances within five year period. 17. The Island, Townshend, and Ball Mountain Reservoirs 
9. Excludes $835,000 Public Works Administration funds. were substituted. 
FLOOD CONTROL UNDER SPECIAL AUTHORIZATION 
(See Section 61 of Text) 
Study Identification FiscalsYear Cost 
Bantam Lake, Morris-Litchfield, Conn. $ 6,032 
Blackstone River, Millville, R. I. 1,391 
Furnace Brook, Quincy, Mass. 23,712 
Israel River, Lancaster, N. H. 37,422 
Smelt Brook, Weymouth-Braintree, Mass. 6,318 
Steel Brook, Watertown, Conn. 2,876 
79

TABLE 1-P 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COMPLETED FLOOD PLAIN STUDIES 
(See Section 63 in Text) 
Date Federal 
Location Requesting Agency Completed Cost 
Androscoggin River, Auburn-Lewiston, Maine Soil and Water Resources Commission, State July 1969 $25,600 
of Maine 
Assabet River from Westborough to Concord, Mass. Water Resources Commission, Commonwealth of June 1966 31,800 
Massachusetts 
Black River and tributaries, vicinity of Springfield, Vt. Water Resources Board, State of Vermont Mar. 1969 20,400 
Byram River and shore area, Greenwich, Conn. Water Resources Commission, State of Connecticut Oct. 1964 17,543 
Charles River, vicinity of Medway, Mass. Water Resources Commission, Commonwealth of Aug. 1967 12,995 
Massachusetts 
Conant and Chicopee Brooks, vicinity Monson, Mass. Water Resources Commission, Commonwealth of Apr. 1964 21,304 
Massachusetts 
Concord and Shawsheen Rivers, vicinity of Bedford, Water Resources Commission, Commonwealth of Sept. 1968 11,600 
Mass. Massachusetts 
Farmington River, vicinity Farmington, Simsbury, Water Resources Commission, State of Connecticut Mar. 1966 28,588 
and Avon, Connecticut 
Hockanum River, vicinity of Vernon, Conn. Water Resources Commission, State of Connecticut June 1966 16,024 
Mill River, vicinity of Hamden, Conn. Water Resources Commission, State of Connecticut Mar. 1968 20,700 
Millers River, vicinity of Athol and Orange, Mass. Water Resources Commission, Commonwealth of June 1965 19,609 
Massachusetts 
Quinnipiac River, vicinity North Haven and Water Resources Commission, State of Connecticut Mar. 1965 27,340 
Wallingford, Conn. 
Quinnipiac River, Southington, Conn. Water Resources Commission, State of Connecticut Jan. 1970 24,000 
Roaring Brook, vicinity of Avon, Conn. Water Resources Commission, State of Connecticut Oct. 1966 14,312 
Westfield and Little Rivers, vicinity of Westfield, Mass. Water Resources Commission, Commonwealth of June 1969 27,500 
Massachusetts 
80

NEW YORK, N.Y., DISTRICT* 
This district comprises western Vermont, small 
portions of western Massachusetts, Connecticut, and 
eastern and south-central New York, including Long 
Island, and northeastern New Jersey, embraced in the 
drainage basins tributary to Lake Champlain and St. 
Lawrence River system east thereof and to Atlantic 
Ocean from New York-Connecticut State line to but 
not including Manasquan Inlet, N.J. It exercises 
jurisdiction, however, over all matters pertaining to 
improvement of Great Lakes to Hudson River 
waterway. Under the direction of the Secretary of the 
Army, the district engineer, as Supervisor of New York 
Harbor, also exercises jurisdiction under the laws 
enacted for the preservation of the tidal waters of New 
York Harbor, its adjacent or tributary water, and 
waters of Long Island Sound. 
IMPROVEMENTS 
Navigation 
1. Aquatic Plant Control ............................. 
2. Bay Ridge and Red Hook Channels, 
N .Y . ..... ....... ........... .................... .. 
3. Buttermilk Channel, N.Y ........................ 
4. East Chester Creek, N.Y ......................... 
5. East Rockaway Inlet, N.Y ...................... 
6. Fire Island Inlet, N.Y ......................... 
7. Great Lakes to Hudson River 
Waterway, N.Y ................................... 
8. Hudson River, N.Y. ............................. 
9. Hudson River Channel, N.Y. .......... 
10. Jones Inlet, N.Y ........................................ 
11. Lake Montauk Harbor, N.Y. ................... 
12. Larchmont Harbor, N.Y ......................... 
13. Long Island Intracoastal Waterway, 
N.Y. ..... .......... ...... ..... ............. 
14. Moriches Inlet, N.Y ................................. 
15. Narrows of Lake Champlain, N.Y. and 
V t ............................................................ 
16. Newark Bay, Hackensack and Passaic 
Rivers, N.J. ..................................... 
17. New York & New Jersey Channels ........ 
18. New York Harbor - collection and 
rem oval of drift ..................................... 
19. New York Harbor - entrance channels 
20. 
21. 
22. 
23. 
24. 
25. 
26. 
& anchorage areas .............................. 
Raritan River, N.J .................................. 
Shrewsbury River, N.J ............................ 
Westchester Creek, N.Y ...................... 
Supervisor of New York Harbor .......... 
Reconnaissance and condition surveys ... 
Other authorized navigation projects ..... 
Navigation work under special 
authorization ....................................... 
Alteration of Bridges 
27. Staten Island Rapid Transit Railway 
Co. bridge across Arthur Kill, N.Y. ... 
Page 
82 
82 
82 
83
q3 
28. 
29. 
Beach Erosion Control Page 
Fire Island Inlet, Long Island, N.Y. ...... 96 
Other authorized beach erosion control 
projects .............................................. ... 98 
03 Flood Control 
84 30. Bennington, Hoosic River Basin, Vt. ...... 98 
31. East Rockaway Inlet to Rockaway Inlet 
84 and Jamaica Bay, N.Y. ..................... 98 
32. Elizabeth, N.J ..................................... . 99 
86 33. Fire Island Inlet to Montauk Point, 
8877 N.Y ........... .............. .. ............... 100 
87 34. Herkimer, N.Y. ..................................... 102 
35. North Ellenville, N.Y. ............................ 103 
36. Rahway, N.J. ..................................... 103 
88 37. Rahway, South Branch, N.J. ................... 104 
88 38. Raritan Bay and Sandy Hook Bay, N.J. 104 
39. Rosendale, N.Y ..................................... 106 
8 40. Sandburg Creek, Spring Glen, N.Y. ....... 106 
41. South Ellenville, N.Y. 107 
89 42. South Orange, N.J. ................................ 107 
9413 . Staten Island, N.Y ................................. 108 
44. Waterbury Reservoir, Winooski River 
Basin, Vt. .................................... .... 109 
92 45. Wrightsville Reservoir, Winooski River 
93 Basin, Vt. ..................................... 109 
46. Inspection of completed flood control 
projects ........................................... 110 
47. Other authorized flood control projects . 110 
95 48. Flood control work under special 
96 authorization ................................... 110 
96 
96 
49. 
96 50. 
General Investigations 
Surveys ..................................... 111 
Collection and study of basic data ......... 111 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
81

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
NAVIGATION 
1. AQUATIC PLANT CONTROL 
Location. Navigable waters, tributary streams, 
connecting channels, and other allied waters in New 
York District. 
Existing project. Provides for control and progressive 
eradication of water-hyacinth, alligatorweed, Eurasian 
water milfoil, and other obnoxious aquatic plant 
growths, from the navigable waters, tributary streams, 
connecting channels, and other allied waters of the 
United States, in the combined interest of navigation, 
flood control, drainage, agriculture, fish and wildlife 
conservation, public health, and related purposes, 
including continued research for development of the 
most effective and economic control measures. Project 
was authorized by section 104, River and Harbor Act 
of 1958 (H.Doc. 37, 85th Cong., 1st session). Section 
104, River and Harbor Act of 1962, modified 
authorizing act to provide that research costs and 
planning costs prior to construction shall be borne fully 
by the United States and shall not be included in the 
cost to be shared by local interests. Section 302, River 
and Harbor Act of 1965, modified authorizing act to 
include United States waters and to provide for control 
of waterchestnut. Estimated yearly Federal cost of new 
work in New York District is $28,000. Cost to local 
interests during the year is estimated at $12,000. 
Local cooperation. Local interests must provide 30 
percent of the cost of the program except as modified 
by 1962 River and Harbor Act and agree to hold the 
United States free from damages. State indicated on 
March 17,1970 its intention to cooperate. 
Operations and results during fiscal year. Planning in 
connection with the waterchestnut control in the 
Hudson-Mohawk basin was completed, including 
design studies. Costs for planning were $15,969 by the 
New York District. 
Condition at end of fiscal year. Reconnaissance report 
covering the aquatic plant problems of the North 
Atlantic Division area was completed in August 1967. 
Planning for the waterchestnut control in the Hudson- 
Mohawk basin was completed by the New York 
District. 
2. BAY RIDGE AND RED HOOK 
CHANNELS, N.Y. 
Location. These channels lie along east shore of Upper 
Bay, New York Harbor, and with Buttermilk Channel, 
form an easterly channel along Brooklyn waterfront 
from the Narrows to East River. (See Coast and 
Geodetic Survey Charts 369 and 541.) 
Previous projects. For details see Annual Reports for 
1915 and 1938; pages 1768 and 195, respectively. 
Existing project. A channel 1,200 feet wide and 40 feet 
deep at mean low water from the Narrows to Bay 
Ridge Avenue, Brooklyn, thence 1,750 feet wide to 
junction of Bay Ridge and Red Hook Channels, thence 
1,200 feet wide through Red Hook Channel to junction 
with Buttermilk Channel and a channel of same depth 
extending into Gowanus Bay from junction of Bay 
Ridge Channel with Red Hook Channel, narrowing 
uniformly in width to about 500 feet at 28th Street, 
Brooklyn. Section included in project is 4 miles long. 
Mean tidal range, 4.7 feet; mean range of spring tides, 
5.6 feet; irregular fluctuations due to wind and 
barometric pressure vary from 3.9 feet below mean low 
water up to 5.2 feet above mean high water. New work 
for completed project cost $4,277,197, exclusive of 
amounts expended on previous projects. (See Table 2-B 
for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. See Port Series No. 5, revised 1965, 
Vol. 2, Part 2, pages 153-170. 
Operations and results during fiscal year. Hopper Dredge 
Essayons and attendant plant were employed 
intermittently from August 1 to September 30, 1969, in 
dredging to restore partial project depth of 35 feet in 
Bay Ridge Channel. Removed 977,560 cubic yards, 
place measurement, of material at a cost of $662,489, 
including $10,812 for engineering preliminary to 
dredging for maintenance. 
Condition at end of fiscal year. Work under existing 
project was commenced March 1901 and completed 
June 1940. Total cost of existing project to June 30, 
1970 was $11,442,479 - $4,212,637 regular funds and 
$64,560 public works funds, a total of $4,277,197 for 
new work and $7,165,282 for maintenance. 
3. BUTTERMILK CHANNEL, N.Y. 
Location. Connects deep water in Upper Bay, New 
York Harbor, southwest of Governors Island, with deep 
water in East River northeast of Governors Island, and, 
with Bay Ridge and Red Hook Channels, forms an 
easterly channel along Brooklyn waterfront from 
Narrows to East River. It lies between Governors 
Island and Borough of Brooklyn, New York City. (See 
Coast and Geodetic Survey Charts 541 and 745.) 
Previous projects. For details see page 205, Annual 
Report for 1932. 
Existing project. A channel 1,000 feet wide, 40 feet 
deep at mean low water for width of existing 500-foot 
channel and 35 feet deep for remaining 500-foot width 
of existing channel. Suitable widening at junctions with 
East River and Anchorage Channel to 35 feet deep and 
with Red Hook Channel to 40 feet deep and for 
additional widening with Anchorage and Red Hook 
Channels to provide a minimum clear channel width of 
2,100 feet to 35 feet deep. Section included in project is 
2.25 miles long. Mean tidal range 4.4 feet; mean range 
of spring tides, 5.3 feet; irregular fluctuations due to 
wind and barometric pressure vary from 3.8 feet mean 
low water up to 5.2 feet above mean high water. New 
work for completed project cost $4,093,951, exclusive of 
amounts expended on previous projects. (See Table 2-B 
for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. See Port Series No. 5, revised 1965, 
Vol. 2, Part 2, pages 148-152. 
82

NEW YORK, N.Y., DISTRICT 
Operations and results during fiscal year. Hopper Dredge 
Essayons and attendant plant were employed 
intermittently from May 5 to 27, 1970, in dredging to 
remove shoals in the 35-and 40-foot channels. 
Removed 303,112 cubic yards, place measurement, of 
material at a cost of $275,700, including $9,330 for 
engineering preliminary to dredging for maintenance. 
Condition at end of fiscal year. Work under existing 
project commenced October 1903 and was completed 
March 1965. Easterly 500-foot width of channel, from 
Anchorage Channel to East River, was completed to a 
40-foot depth in May 1935. Westerly 500-foot channel, 
including widening the junction with East River, was 
completed to a 35-foot depth in July 1961. Widening 
the junctions with Anchorage and Red Hook Channels 
was completed in March 1965. Total cost of existing 
project to June 30, 1970 was $6,693,608 - $122,051 
public works funds and $3,971,900 regular funds, a 
total of $4,093,951 for new work and $2,599,657 for 
maintenance. 
4. EAST CHESTER CREEK, N.Y. 
Location. This creek, also known as Hutchinson 
River, is a small tidal stream emptying into East 
Chester Bay, an indentation in north shore of Long 
Island Sound immediately north of Throgs Neck, 12 
miles southwest of Connecticut State line and 21 miles 
by water northeast of the Battery, New York City. (See 
Coast and Geodetic Survey Chart 223.) 
Previous projects. For details see Annual Reports for 
1915, 1929, 1938 and 1949, pages 1761, 167, 163, and 
208, respectively. 
Existing project. A channel 10 feet deep at mean low 
water and generally 150 feet wide from Long Island 
Sound through East Chester Bay to a point 700 feet 
below Boston Post Road Bridge, and thence 70 feet 
wide extending to a point where the creek divides into a 
Y, thence approximately 1,000 feet into east branch of 
the Y and approximately 500 feet into west branch of 
the Y; a passing basin south of Boston Post Road 
Bridge; widening channel at Boston Post Road Bridge; 
and construction of a check dam at head of navigation. 
Section included in project is 5 miles. Mean tidal 
range, 7.3 feet in the estuary; mean range of spring 
tides, 8.6 feet; irregular fluctuations due to wind and 
barometric pressure vary from 3.9 feet below mean low 
water up to 8.1 feet above mean high water. Estimate of 
cost for new work is $1,190,000 (1970) exclusive of 
amounts expended on previous projects and inclusive 
of an estimated $30,000 non-Federal cost for lowering 
utilities. (See Table 2-B for authorizing legislation.) 
Local cooperation. River and Harbor Act of May 17, 
1950, provides that local interests furnish lands, rightsof-
way, and suitable areas for disposal of dredged 
material during construction and future maintenance, 
and hold the United States free from damages. City of 
New York has complied with requirements. Assurances 
are yet to be received from other local interests 
concerned with improvement. 
Terminal facilities. See Port Series No. 5, revised 1965, 
Vol. 2, Part 2, 
Operations and results during fiscal year. Surveys to 
determine condition of the waterway cost $19,801. 
Condition at end of fiscal year. No work has been done 
under existing project and there have been no costs or 
expenditures. Minimum width through bridge draws is 
59.6 feet. Head of navigation is about 1,550 feet above 
Fulton Avenue Bridge. 
5. EAST ROCKAWAY INLET, N.Y. 
Location. On south shore of Long Island between 
main body of island and western end of Long Beach. It 
is 10 miles east of Rockaway Inlet and about 27 miles 
by water south and east from the Battery, New York 
City. (See Coast and Geodetic Survey Charts 579 and 
1215.) 
Existing project. A channel 12 feet deep at mean low 
water and 250 feet wide from 12-foot contour in 
Atlantic Ocean for about 0.6 mile to 12-foot contour in 
Long Beach Channel protected by a jetty. Mean tidal 
range, 4.3 feet; mean range of spring tides, 5.2 feet; 
irregular fluctuations due to wind and barometric 
pressure vary from 3.9 feet below mean low water up to 
5.6 feet above mean high water. New work for 
completed active portion of project cost $603,969, 
including $100,000 contributed funds. West jetty 
portion of project is considered inactive and excluded 
from foregoing description of existing project and cost 
estimate. Estimated cost (1954) of this portion is $806, 
000. (See Table 2-B for authorizing legislation.) 
Local cooperation. Fully complied with, except for 
construction of west jetty which is not considered 
necessary at this time, easements, rights-of-way, and 
release of claims for damages necessary for construction 
are not being secured. 
Terminal facilities. There are 39 terminals in 
Oceanside, Island Park, Long Beach, and East 
Rockaway. Nine of these are oil terminals, one of which 
has a railroad spur. Other terminals consist of repair 
and mooring docks with a berthage of 7,655 feet. Of 
these, 21 have marine railways and 1 has mechanicalhandling 
facilities. There are public wharves at East 
Rockaway and Woodmere, and waterfront on north 
side of Long Beach has been bulkheaded. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. Hopper Dredge 
Hyde and attendant plant were employed 
intermittently from April 12 to 26, 1970, in dredging to 
restore project depth of 12 feet. Removed 53,485 cubic 
yards of material, at a cost of $95,438 including $5,775 
for engineering preliminary to dredging for 
maintenance. 
Condition at end of fiscal year. Work under active 
portion of existing project began February 1933 and is 
100 percent complete. East jetty, 4,250 feet long, was 
completed in July 1934. Project channel was completed 
in May 1935. East jetty was in good condition except 
for minor repairs. Work remaining under existing 
project consists of building a west jetty, if necessary, to 
protect channel. 
83

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
6. FIRE ISLAND INLET, N.Y. 
Location. On south shore of Long Island, about 50 
miles by water south and east of the Battery, New York 
City. It is the main entrance into Great South Bay from 
the Atlantic Ocean. (See Coast and Geodetic Survey 
Chart 578.) 
Existing project. A jetty extending generally southwest 
and south for 5,000 feet from high ground on Democrat 
Point at west end of Fire Island, and a channel 10 feet 
deep and 250 feet wide from deep water in ocean to 
deep water within inlet. Mean tidal range at ocean and 
inlet ends of Democrat Point are 4.1 and 2.4 feet, 
respectively. Mean range of spring tides on the ocean 
side is 5.0 feet. Irregular fluctuations due to wind and 
barometric pressure vary from 2.5 feet below mean low 
water up to 6.2 feet above mean high water on the 
ocean side. New work for completed project cost $684, 
545, including $90,190 contributed by local interests. 
(See Table 2-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. None within area immediately 
adjacent to Federal improvement. In Great South Bay 
there are 28 boat repair and storage yards, 3 
commercial fish terminals and 3 ferries, with a total 
berthage of 25,440 feet. Twenty-eight terminals have 
marine railways and 13 are public wharves. In 
addition, Patchogue River has 12 boat repair and 
storage yards, 1 ferry, and 3 fuel oil terminals, with a 
total berthage of 8,380 feet. Fourteen are equipped 
with marine railways and 2 are public wharves. 
Facilities are considered adequate for existing 
commerce. In addition to the commercial facilities 
there are numerous privately-owned terminals. 
Operations and results during fiscal year. Hopper Dredge 
Hyde and attendant plant were employed 
intermittently from April 27 to June 7, 1970 in 
dredging to restore project depth of 10 feet in the outer 
reach. Removed 283,958 cubic yards, place 
measurement, of material at a cost of $228,648, 
including $8,182 for engineering preliminary to 
dredging for maintenance. Reconnaisance surveys cost 
$6,008. 
Condition at end of fiscal year. Work under existing 
project was commenced June 1939. Jetty was 
completed in 1941 and since a survey made in 
November 1953 revealed existence of a channel with 
dimensions substantially the same as those authorized, 
work under existing project was considered complete 
November 1953. Jetty has surpassed its capacity as a 
sand entrapping agent and when examined in June 
1969, was found to be in poor condition. 
7. GREAT LAKES TO HUDSON RIVER 
WATERWAY, N.Y. 
Location. Consists of portion of New York State Barge 
Canal system extending from Hudson River at 
Waterford to Oswego Harbor on Lake Ontario. (See 
Lake Survey Charts 183, 184, and New York Canal 
Charts.) 
Existing project. Provides for allotment of Federal 
funds to the State of New York for expenditure under 
suitable Federal control and supervision in 
improvement of canal connecting Lake Ontario with 
the Hudson River. Improvement provides for a depth 
of 13 feet below normal pool level through all locks 
between Waterford and Oswego, deepening between 
locks to 14 feet below normal pool level, widening at 
bends and elsewhere, and increasing overhead 
clearance to 20 feet at maximum navigable stage at 
bridges and other overhead structures. Widths of 
channel to be provided under project are 104 feet in 
earth cuts, 120 feet in rock cuts, 200 feet in river 
sections, with widening at bends and elsewhere as may 
be necessary. Waterway included in this project is 
about 184 miles long, of which 160 miles are in Erie 
Canal from Waterford to Three Rivers Point and 24 
miles are in Oswego Canal from Three Rivers Point to 
Oswego. Cost estimate for new work is $33,900,000 
(July 1968). No estimate of maintenance with Federal 
funds is included, as maintenance of canal is not a part 
of Federal project. (See Table 2-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. State of New York provided 
terminal and transfer facilities at all important points 
along Erie and Oswego Canals, and at Buffalo, Troy, 
Albany, and New York Harbor. Freight-handling 
equipment, as well as storage and dock facilities, is 
governed by requirements of particular locality. Stateowned 
terminal at Oswego has a grain elevator with a 
capacity of 1 million bushels. Albany Port District 
Commission erected a grain elevator at Albany with a 
capacity of 13,500,000 bushels. Port of New York 
Authority grain terminal in New York Harbor on 
Gowanus Bay has a capacity of about 1,800,000 
bushels. The grain terminal on Gowanus Bay is not 
being used or operated. Terminals at Buffalo, 
Rochester, Syracuse, Schenectady, Troy; Albany, and 
Oswego are provided with direct railroad connections. 
All State-owned terminals are open to the public on 
equal terms. Lake-port terminals are extensive in 
character. Available terminals appear ample to meet 
all requirements. 
Operations and results during fiscal year. Costs of $270,058 
reported for partial reimbursement to State of New 
York for work performed are set forth in Table 2-C at 
the end of this chapter. Government costs incurred 
were $18,867 for new work. 
Condition at end of fiscal year. Work under existing 
project began September 1935 and is physically 
complete. Forty-one barge canal bridges and three 
guard gates were raised to project clearance, one bridge 
lengthened, two bridges removed, and four guard gates 
replaced under Federal project for improvement. 
Project vertical clearance was provided at two 
additional bridges with Federal funds by construction 
of additional spillway capacity at Herkimer, N.Y. 
Eleven bridges were removed and replaced with new 
structures at project clearance with the Federal 
contribution limited to the estimated cost for 
theoretical raising the existing structure to project 
84

NEW YORK, N.Y., DISTRICT 
clearance. Six additional bridges and one arch beam 
were raised, seven bridges removed and seven bridges 
removed and replaced by new structures at project 
clearance, all by other agencies. Present depth is 14 feet 
at normal pool level for following width; 104 feet in 
earth cuts, 120 feet in rock cuts, and 200 feet in 
canalized rivers and lakes. Twenty-nine locks, 22 in 
Erie Canal east of Three Rivers Point, and seven in 
Oswego Canal north of Three Rivers Point, have a 
clear width of 43.5 feet, usable length of 300 feet, and 
depth over sills is 13 feet. No alterations are required in 
Lock 8, Erie Canal, and Locks 5 and 8, Oswego Canal. 
Lock 4, Oswego Canal, does not exist. Numerous fixed 
bridges, transmission lines and other structures span 
the waterway. There are 66 bridges between Waterford 
and Three Rivers Point and 17 between Three Rivers 
Point and Oswego. Work of lowering lock sills and 
channel deepening and widening is physically 
completed. Miles of channel deepened to project 
dimensions are; Hudson River to Guard Gate 2 at 
Waterford, 2.8 miles; Guard Gate 2 at Waterford to 
Lock 10 at Cranesville, 32.2 miles; Lock 10 at 
Cranesville to Lock 16 at Mindenville, 36.1 miles; Lock 
16 at Mindenville to Guard Gate 5 at Herkimer, 16.4 
miles; and Guard Gate 5 at Herkimer to Oswego 
Harbor, 96.7 miles. Bank revetment and raising of 
bridges to project vertical clearance of 20.0 feet above 
maximum navigable stage is physically complete. 
8. HUDSON RIVER, N.Y. 
Location. Has its source in Adirondack Mountains, 
about 250 miles in a direct line and 315 miles along its 
course from the Battery, New York City, and flows 
generally southerly into New York Bay. Section under 
improvement extends from New York City about 156 
miles to Waterford. (See Coast and Geodetic Survey 
Charts 282, 283, 284, 747, and 748.) 
Previous projects. For details see Annual Reports for 
1915 and 1938, pages 1764 and 226, respectively. 
Existing project. A channel 600 feet wide from New 
York City to Kingston and thence 400 feet wide to 
Albany, with widening at bends, a turning basin 700 
feet wide and 1,200 feet long at Albany, and 2 
anchorages, 1 near Hudson and 1 near Stuyvesant, 
each 400 feet wide and an average length of 2,400 feet; 
all with depths of 32 feet in soft material and 34 feet in 
rock to 1,400 feet south of the Dunn Memorial Bridge; 
thence 27 feet deep and 400 feet wide to 100 feet south 
of the Dunn Memorial Bridge; thence 14 feet deep at 
lowest low water and generally 400 feet wide to Federal 
lock at Troy; and thence of same depth and 200 feet 
wide to southern limit of State barge canal at 
Waterford; and removal of State dam at Troy and 
construction of a lock and dam about 2.50 miles below 
Waterford. Channel is to be formed by dredging and 
rock excavation, and maintained by dredging and 
constructing new, and raising and repairing old, 
longitudinal dikes, built partly under previous projects 
and partly by the State of New York. Mean range of 
pool elevation above Federal dam at Troy, in seasons of 
moderate rains, is about 2.2 feet, as determined in 1934. 
Mean tidal range is about 4.8 feet between May and 
October and 5.1 feet between July and September at 
Federal dam at Troy and about 4.8 feet between May 
and October and 5.0 feet between July and September 
at Albany, extreme range due to freshets is 33.1 and 
25.9 feet, respectively. Normal pool level above Federal 
dam from Troy to Waterford is 14.33 feet above mean 
sea level. In tidal section of river below dam, assumed 
lowest low water plane from Troy to Albany is 3 feet 
below Mean sea level. (See Table 2-D for features of 
lock and dam included in existing project.) New work 
for completed project cost 39,045,699 exclusive of 
amounts expended on previous projects. Widening to 
form harbors at Albany and Troy, N.Y., to 12 feet deep 
at a cost of $552,000 (1954) and completion of 27-foot 
channel at Albany at a cost of $458,000 (1957) are 
considered inactive. Construction of dikes at a cost of 
$642,000 (1957) was placed in deferred for restudy 
category. All three features of work are excluded from 
foregoing description of existing project and cost 
estimate. (See Table 2-B for authorizing legislation.) 
Local cooperation. Complied with except that local 
interests must furnish suitable spoil disposal areas for 
future maintenance as required. 
Terminal facilities. Piers and other terminal or transfer 
facilities served by the improvement are; between 
Waterford and Federal dam at Troy there are 14 
wharves aggregating about 5,000 feet in length. State of 
New York constructed a barge-canal terminal at 
Cohoes. There is a dock 325 feet long on west side of 
river just north of Federal dam. At Troy there are nine 
terminals with available dockage of 2,383 feet, 
including the State barge-canal terminal with 960 feet. 
In addition, 1.25 miles of concrete bulkhead were 
constructed along waterfront by city of Troy. At 
Watervliet there is a stone bulkhead 755 feet long. 
Between this point and Albany there are five timber 
wharves aggregating 2,300 feet in length. At Albany, 
and Rensselaer on east side of river, there are 25 
terminals aggregating 15,150 feet of available 
berthage, and the State barge-canal terminal with 1, 
586 feet on west side of the river. These terminals are 
adequately served with railroad trackage. There are 
five transit sheds, one warehouse, a 13,500,000 bushel 
grain elevator, and a molasses-storage plant, all 
provided by Albany Port District Commission. 
Between Albany and Hudson there are about 100 
timber wharves aggregating 36,700 feet in length; at 
Hudson there are 12 timber wharves aggregating 5,000 
feet in length; at Athens there are nine timber wharves 
aggregating 4,000 feet in length. Between Hudson and 
upper limits of New York City entire waterfronts of 
Poughkeepsie, Newburgh, and Yonkers are equipped 
with transfer facilities. At Poughkeepsie there are six 
terminals with available dockage of 2,580 feet. At 
Newburgh and New Windsor there are 17 terminals 
with a total dockage of 8,431 feet, of which one with 90 
feet of dockage is open to the public. At Yonkers there 
are 20 terminals with dockage of 5,764 feet, of which 
85

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
531 feet are for public use. Existing wharves are ample 
for Hudson River traffic. 
Operations and results during fiscal year. By use of 
Government plant and hired labor, stumps and snags 
which formed a potential me nace to navigation, and 
other obstructions, were removed from the shores and 
channel of the river at a cost of $62,997 for 
maintenance. 
Government plant and hired labor were employed 
intermittently through the fiscal year in performing 
surveys to restore horizontal and vertical controls, at a 
cost of $35,075 for maintenance. 
Government plant and hired labor were employed 
intermittently through the fiscal year on repairs to 
Overslaugh Dike at a cost of $46,726, including $384 
for engineering preliminary to repairs. Surveys to 
determine condition of the channel cost $6,855, for 
maintenance. 
The lock and dam in Hudson River at Troy, N.Y. 
was operated and maintained. Operation of lock for 
1969 navigation season was suspended December 6, 
1969 and resumed April 16, 1970 for 1970 season. Cost 
incurred was $202, 158 for maintenance. 
Under a continuing contract for rebuilding mooring 
piers at south entrance to Troy Lock, work commenced 
in previous fiscal year continued from July 1, 1969 to 
March 30, 1970 and June 8 to 30, 1970, at a cost of 
$466,144, including $2,357 for engineering preliminary 
to repairs for maintenance. 
Under a proposed contract for purchase of four new 
valves with tracks for installation in lock chamber at 
Troy Lock, engineering and design cost $9,158, for 
maintenance. 
Condition at end of fiscal year. Work under existing 
project began in July 1910 and was substantially 
completed in November 1965. New lock and dam at 
Troy, removal of dam at Troy and construction of 15, 
545 linear feet of dikes also are complete. In 
reconstruction of old dikes 39,676 linear feet were 
raised to adopted crest height. Channel from New York 
City to Albany is complete to a depth of 32 feet except 
for the 1,500 linear-foot section at the northern end of 
the 32-foot project which has never been dredged to 
project depth. Additionally, the 1,400 linear feet of the 
27-foot project remains undredged. Channel from 
Albany to Waterford is complete to a depth of 14 feet 
except for a small part of the widening to form a harbor 
at Troy. Work remaining under the project consists of 
completion of the 12-foot harbor at Troy and dredging 
the 27-foot and the remainder of the 32-foot channels 
at Albany which are not deemed necessary at this time; 
and reconstruction of dikes. (See Table 2-E for total 
costs of existing project toJune 30, 1970.) 
9. HUDSON RIVER CHANNEL, N.Y. 
Location. Hudson River empties into Upper Bay of 
New York Harbor at the Battery, New York City. 
Section included under this title extends from deep 
water in Upper New York Bay about 14.5 miles to just 
north of Harlem River (Spuyten Duyvil Creek). (See 
Coast and Geodetic Survey Charts 745, 746, and 747.) 
Previous projects. For details see Annual Reports for 
1915 and 1938, pages 1765, and 213 respectively. 
Existing project. A channel 48 feet deep and 2,000 feet 
wide, suitably widened at bends from West 59th Street, 
Manhattan, to West 40th Street, thence 45 feet deep of 
same width to deep water in Upper Bay; a channel 40 
feet deep for full width of river extending from 
northline of 59th Street to south side of Little Basin, 
and thence a channel of same depth to deep water in 
Upper New York Bay off Ellis Island, substantially as 
shown on maps in H. Doc, 309, 72d Cong., 1st sess., 
subject to provision that no dredging be done under 
project within 50 feet of pierhead lines; a channel 750 
feet wide and 30 feet deep along Weehawken- 
Edgewater waterfront; removal of a shoal on New York 
side between West 59th and West 61st Streets to a 
depth of 40 feet; and removal of an obstruction north of 
mouth of Spuyten Duyvil Creek to depth of 
surrounding river bottom. Channel included in project 
is about 11 miles long. Plane of reference is mean low 
water. Mean tidal range at the Battery, 4.4 feet, and at 
West 129th Street, 4.1 feet; mean range of spring tides, 
5.3 and 4.9 feet, respectively; irregular fluctuations due 
to wind and barometric pressure vary from 3.8 feet 
below mean low water at the Battery up to 6.2 feet 
above mean high water and at West 129th Street from 
3.6 feet below mean low water up to 5.3 feet above 
mean high water. New work for completed project cost 
$6,702,241, exclusive of amounts expended on previous 
projects. (See Table 2-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. See Port Series No. 5, revised 1965, 
Vol. 2 Part 2, pages 1-29 and 41-91. 
Operations and results during fiscal year. Hopper Dredge 
Goethals and attendant plant were employed 
intermittently from August 16 to September 30, 1969, 
in dredging to restore portions of the 40-, 45- and 48- 
foot channels to authorized dimensions. Removed 698, 
334 cubic yards, place measurement, of material at a 
cost of $485,975, including $8,453 for engineering 
preliminary to dredging for maintenance. Hopper 
Dredge Essayons and attendant plant were employed 
intermittently from May 27 to June 30, 1970 in 
dredging to restore channel along Weehawken- 
Edgewater waterfront to 30-foot depth. Removed 639, 
674 cubic yards, place measurement, of material at a 
cost of $373,705, including $9,014 for engineering 
preliminary to dredging for maintenance. 
Condition at end of fiscal year. Work under existing 
project was commenced April 1913 and completed 
September 1952. Widening and deepening 
Weehawken-Edgewater Channel to project dimensions 
was completed in August 1937. Widening 40-foot 
channel for full width of river from Ellis Island to West 
59th Street, Manhattan, was completed in March 
86

NEW YORK, N.Y., DISTRICT 
1939. Widening 48-foot project to full project width of 
2,000 feet from West 40th Street to West 59th Street 
was completed in November 1950. Deepening 45-foot 
channel for a width of 2,000 feet from Upper Bay to 
West 40th Street was completed to project dimensions 
in Septamber 1952. 
Total cost of existing project to June 30, 1970, was 
$19,999,860-$668,820 public works funds and $6,033, 
421 regular funds-a total of $6,702,241 for new work 
and $13,297,619 for maintenance. 
10. JONES INLET, N.Y. 
Location. A small inlet on south shore of Long Island 
connecting Hempstead Bay with Atlantic Ocean, 37 
miles by water southeast of the Battery, New York City. 
(See Coast and Geodetic Survey Chart 579.) 
Existing project. An entrance jetty and a channel 12 
feet deep and 250 feet wide, from that depth in the 
ocean through the inlet to Loop Causeway Bridge over 
Long Creek. Section included in project is about 2.1 
miles long. Mean tidal range varies from 4.2 feet at 
ocean entrance to 3.1 feet at Loop Causeway Bridge; 
mean range of spring tides varies from 5 to 3.7 feet, 
respectively; irregular fluctuations due to wind and 
barometric pressure vary from 3.9 feet below mean low 
water up to 8.5 feet above mean high water. New work 
for completed project cost $3,645,060, including $1, 
822,530 contributed by local interests. (See Table 2-B 
for authorizing legislation.) 
Local cooperation. Complied with except that local 
interests must furnish suitable spoil-disposal areas for 
future maintenance as required, and must maintain a 
channel 12 feet deep and generally 200 feet wide from 
Loop Causeway Bridge over Long Creek to head of 
navigation in Freeport Creek at Mill Road. 
Terminal facilities. Within area tributary to Jones Inlet 
there are a number of privately owned small wharves 
and 40 boat repair and storage yards. The latter are 
equipped for repair of pleasure craft and fishing vessels. 
In addition, there are nine public wharves open to the 
public free of charge, with a total dockage of 2,180 feet. 
Additional terminals would have to be constructed for 
receipt of commercial freight in any sizable quantity. 
Operations and results during fiscal year. Hopper Dredge 
Hyde and attendant plant were employed 
intermittently from June 8 to 30, 1970, in dredging to 
restore depth of 12 feet in channel. Removed 165,703 
cubic yards, place measurement, at a cost of $151,112, 
including $7,277 for engineering for maintenance. 
Condition at end of fiscal year. Work under existing 
project was commenced August 1953 and completed 
June 1959. 
11. LAKE MONTAUK HARBOR, N.Y. 
Location. On east end of Long Island, about 3 miles by 
land west of Montauk Point and 125 miles by water 
east of New York City. It is landlocked on the east, 
south, and west sides and is connected on the north 
with Block Island Sound by an artificial inlet. (See 
Coast and Geodetic Survey Chart 362.) 
Existing project. A channel 12 feet deep and 150 feet 
wide extending from 12-foot contour in Block Island 
Sound to same depth in existing yacht basin east of Star 
Island; a boat basin 10 feet deep, 400 feet wide, and 900 
feet long, northwest of Star Island; repair and 
extension shoreward of the east and west jetties; and 
addition of sport fishing facilities on top of both jetties. 
Section included in the project is 0.7 mile long. 
Mean tidal range, 1.9 feet; mean range of spring tides, 
2.2 feet; irregular fluctuations due to wind and 
barometric pressure vary from 2 feet below mean low 
water up to 7.1 feet above mean high water. New work 
for completed project cost $883,600, including $9,182 
contributed by local interests and $82,738 Department 
of the Navy funds. (See Table 2-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are fourteen marinas and 
mooring facilities for recreational boats. In addition, 
two terminals are used for commercial fishing vessels. 
None of the terminals has rail connections or is 
equipped with freight handling devices. Terminals are 
considered adequate for existing commerce. 
Operations and results during fiscal year. Under a contract 
for maintenance dredging entrance channel to 12 feet, 
work began July 15 and was completed August 4, 1969. 
Removed 41,874 cubic yards, place measurement of 
material, at a cost of $119,920 including $735 for 
engineering preliminary to dredging for maintenance. 
Reconnaissance surveys cost $716 for maintenance. 
Condition at end of fiscal year. Work under existing 
project was commenced August 1942 and was 
completed November 1968. Dredging entrance 
channel and shoreward extension of west jetty were 
performed from August 1942 to January 1943 at 
request of Department of the Navy. Extension of east 
jetty and repair of both jetties, provision of sport fishing 
facilities on both jetties and dredging the boat basin 
was completed November 1968. 
12. LARCHMONT HARBOR, N.Y. 
Location. On north shore of Long Island Sound about 
25 miles by water east of the Battery, New York City 
and 7 miles west of Connecticut State line. (See Coast 
and Geodetic Survey Chart 222.) 
Previous project. For details see page 1760 of Annual 
Report for 1915. 
Existing project. Provides for a breakwater 1,440 feet 
long southwardly from the 6-foot curve off Long Beach 
Point, and removal of Huron Rock and adjoining 
ledges to 14 feet, mean low water. Mean tidal range, 
7.3 feet; mean range of spring tides, 8.6 feet; irregular 
fluctuations due to wind and barometric pressure vary 
from 3.9 feet below mean low water up to 8.1 feet above 
87

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
mean high water. New work for completed project cost 
$71,065 exclusive of amount expended on previous 
project. (See Table 2-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. There are no facilities for 
waterborne commerce. Harbor is used by pleasure 
craft, and has mooring facilities for approximately 460 
boats. There are also a substantial number of transient 
craft visiting the harbor annually. 
Operations and results during fiscal year. Under a contract 
for minor rehabilitation to the breakwater, 
construction commenced June 30, 1969 and was 
completed October 21, 1969. Placed 12,555 tons of 
stone, at a cost of $215,500, including $1,203 for 
engineering preliminary to maintenance. 
Reconnaissance surveys cost $370 for maintenance. 
Condition at end of fiscal year. Removal of Huron Rock 
was accomplished in 1903, completion of the 
breakwater to 1,410 feet in 1906, and removal of rock 
ledges in 1910. Although the breakwater is 30 feet short 
of authorized length, the project is considered 
completed, since need for the additional length has not 
been demonstrated. Total cost of the existing project to 
June 30, 1970 was $336,515 of which $71,065 was for 
new work and $265,450 for maintenance. 
13. LONG ISLAND INTRACOASTAL 
WATERWAY, N.Y. 
Location. Extends from East Rockaway Inlet, on the 
south side of Long Island, to Great Peconic Bay at 
eastern end of Long Island. Section included under this 
project extends from Great South Bay opposite 
Patchogue to the south end of Shinnecock Canal. (See 
Coast and Geodetic Survey Chart 578.) 
Existing project. A channel 100 feet wide and 6 feet 
deep at mean low water from the federally improved 
channel in Great South Bay, opposite Patchogue to 
south end of Shinnecock Canal. Section included in 
project is 34 miles long. Mean tidal range varies from 1 
foot in Shinnecock Bay to 0.7 foot in Patchogue Bay; 
mean range of spring tides varies from 1.2 feet to 0.8 
foot; irregular fluctuations due to wind and barometric 
pressure vary from 1.8 feet below mean low water to 12 
feet above mean high water. New work for completed 
project cost $235,964. (See Table 2-B for authorizing 
legislation.) 
Local cooperation. Complied with except local interests 
must furnish suitable spoil-disposal areas for future 
maintenance as required. 
Terminal facilities. There are 17 boat repair and 
storage yards within the area immediately adjacent to 
the Federal improvement. There is ample room for 
expansion and development of terminals when future 
commerce warrants. 
Operations and results during fiscalyear. Under a contract 
for dredging to restore project depth of 6 feet in 
specified sections of the channel, work began June 22, 
1970 and continued. Removed 21,465 cubic yards, 
place measurement, of material at a cost of $54,587, 
including $24,527 for engineering preliminary to 
dredging for maintenance. Reconnaissance surveys 
cost $355. 
Condition at end of fiscal year. Work under existing 
project was commenced October 1939 and completed 
September 1940. 
14. MORICHES INLET, N.Y. 
Location. Situated on the south shore of Long Island, 
about 80 miles by water east of the Battery, New York 
City. It is an opening through the narrow, sandy 
barrier beach on the south shore of Long Island which 
separates the Atlantic Ocean from a series of 
interconnected bays. (See Coast and Geodetic Survey 
Chart 578.) 
Existing project. Provides for a channel, 10 feet deep at 
mean low water and 200 feet wide extending from that 
depth in the Atlantic Ocean to Moriches Bay, a 
distance of 0.8 mile; thence a channel 6 feet deep and 
100 feet wide to the Long Island Intracoastal 
Waterway, a distance of 1.1 miles; rehabilitation of the 
existing jetties and revetments; seaward extension of 
the east jetty to the 12-foot contour and seaward 
extension of the west jetty a distance of 400 feet; 
construction of a fixed by-passing facility to transfer 
sand from the east side of the inlet to the west side. 
Mean tidal range in the ocean at the inlet is 3.3 feet 
and in the bay at Westhampton Beach is 0.6 foot. 
Irregular fluctuations due to wind and barometric 
pressure vary from 1.7 feet below mean low water up to 
15.7 feet above mean low water at the bay. 
Estimate of cost for new work is $8,530,000 (July 
1970) including $3,770,000 to be contributed by local 
interests. (See Table 2-B for authorizing legislation.) 
Local cooperation. The River and Harbor Act of July 
14, 1960 provides that local interests shall, prior to 
construction agree to contribute in cash 45 percent of 
the cost of construction by the Corps of Engineers and 
agree to contribute in cash 50 percent of the 
maintenance, operation, and replacement, or perform 
work of equal value when and as acceptable to the 
Chief of Engineers; and provided further that in 
connection with the improvement of the inlet, local 
interests, prior to construction, agree to (a) make the 
cash contribution either in a lump sum prior to 
commencement of the work, or in installments prior to 
commencement of pertinent work items, in accordance 
with work schedules as required by the Chief of 
Engineers, the final apportionment of cost to be made 
after actual costs have been determined; (b) furnish, 
free of cost to the United States, all lands, easements, 
rights-of-way, and suitable spoil-disposal areas for the 
initial work and for subsequent maintenance when and 
as required; and (c) hold and save the United States 
free from damages due to the construction and 
maintenance of the project; (d) provide and maintain 
88

NEW YORK, N.Y., DISTRICT 
suitable terminal facilities when and as required for the 
accommodation of vessels that would navigate the 
inlets and adjacent bays, open to all on equal terms; 
and (e) maintain for the duration of the economic life 
of the project, continued public ownership of the 
publicly owned shores and their administration for 
public use, and continued availability for public use of 
the privately owned shores upon which a portion of the 
Federal share of the cost is based. 
Terminal facilities. No terminals are within the area 
immediately adjacent to the Federal improvement. 
However, numerous public and private terminal 
facilities are available in Moriches Bay and in the 
connecting canals. Three yacht clubs, six boatyards, 12 
public wharves and landings, and numerous private 
landings are located in Moriches Bay. The yacht clubs 
and boatyards have equipment for servicing boats. 
There are four public boat basins open to the public. 
The facilities existing in the bay are considered 
adequate for present and probable future needs. There 
is room for expansion should future commerce warrant. 
Operations and results during fiscal year. Advance 
engineering and design was continued. Additional 
tidal and current velocity measurements and 
hydrographic surveys were completed. Testing of the 
model at Waterways Experiment Station was 
completed. Costs for new work were $94,416 for design 
engineering and $18,411 for supervision and 
administration. 
Condition at end of fiscal year. Construction has not been 
initiated. Preconstruction planning (advance 
engineering and design) is about 70 percent complete. 
15. NARROWS OF LAKE CHAMPLAIN, 
N.Y. AND VT. 
Location. This waterway, 37 miles long, comprises 
southern end of Lake Champlain and extends from 
Whitehall to Crown Point, N.Y. Portion included in 
project extends 13.5 miles from Whitehall, N.Y., at 
southern extremity of lake, northerly to Benson 
Landing, Vt. (See Lake Survey Chart 174.) 
Previous projects. For details, see Annual Reports for 
1932, and 1963, pages 256 and 177, respectively. 
Existing project. A channel extending from Whitehall, 
N.Y., at head of Lake Champlain, to Benson Landing, 
12 feet deep at low lake level and generally 150 feet 
wide, and installation of fender booms at Putts Rock, 
Putts Leap, Narrows near Dresden, Pulpit Point, and 
Cedar Mountain. Reference plane of low lake level is 
93 feet above mean sea level. Section included in 
project is about 13.5 miles. Usual annual variation of 
lake level is 5.8 feet, and extreme variation varies from 
0.6 foot below up to 8.8 feet above low lake level. 
New work for completed portion of project cost $566, 
811, exclusive of amounts expended on previous 
projects. 
Widening channel throughout its entire length to 
project width of 200 feet is considered inactive and 
excluded from foregoing description of existing project 
and cost estimate. Estimated cost of this portion, 
revised in (1954), was $1,573,000. (See Table 2-B for 
authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. In Whitehall Harbor consisting of 
three timber wharves, aggregating 4,200 feet in length. 
State of New York constructed a barge canal terminal 
at Whitehall, just south of terminus of canal, which has 
been equipped with a 15-ton hand-operated derrick 
and a storehouse. Facilities are considered adequate for 
present commerce. 
Operations and results during fiscal year. Government 
plant and hired labor were employed intermittently 
during the fiscal year in performing surveys to restore 
horizontal and vertical controls, at a cost of $19,381 for 
maintenance. 
Government plant and hired labor were employed 
intermittently during the fiscal year in repair and 
replacement of the fender booms at a total cost of $4, 
193 for maintenance. Reconnaissance surveys cost $1, 
497 for maintenance. 
Condition at end of fiscal year. Work under the existing 
project was commenced June 1919 and is about 47 
percent complete. A channel 12 feet deep at low lake 
level and least width of 150 feet has been excavated 
throughout the length of the improvement, except at 
the Elbow (Putts Leap and Putts Rock). (Fender 
booms opposite the Delaware and Hudson Railroad 
trestle have been removed as they no longer are 
considered necessary for navigation). No fender booms 
appear to be needed at the Narrows near Dresden, 
Pulpit Point, and Cedar Mountain. The work 
remaining to complete the project consists of widening 
the channel throughout its entire length to the project 
width of 200 feet. 
The total cost of the existing project to June 30, 1970 
was $1,185,167; $566,811 for new work and $619,356 
for maintenance. 
16. NEWARK BAY, HACKENSACK AND 
PASSAIC RIVERS, N.J. 
Location. Newark Bay is an estuary about 1.25 miles 
wide and 6 miles long extending southerly from 
confluence of Hackensack and Passaic Rivers to New 
York and New Jersey Channels. Hackensack River 
rises near Haverstraw, Rockland County, N.Y., and 
flows about 45 miles into Newark Bay. Passaic River 
rises in highlands of northeastern NewJersey and flows 
about 80 miles into Newark Bay. (See Coast and 
Geodetic Survey Charts 285 and 287.) 
Previous projects. For details see 1926 Annual Report, 
pages 265 and 266; and Annual Reports for 1929, 1938, 
and 1954, pages 301,244, and 134, respectively. 
Existing project. (a) Newark Bay; A main channel 37 
feet deep in rock and 35 feet in other material, 700 feet 
wide to branch channel to Port Newark Terminal; 
89

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
thence 35 feet deep and 500 feet wide to junction of 
Passaic and Hackensack River channels; removal of 
east and west cutoffs at junction with Kill Van Kull; a 
maneuvering area south of Central Railroad of New 
Jersey bridge 300 feet wide and 2,200 feet long with 
depths of 35 feet in northern half and 40 feet in rock 
and 38 feet in other material in southerly half; a 
maneuvering area north of Central Railroad of New 
Jersey bridge 300 feet wide and 2,200 feet long with a 
depth of 35 feet; and a turning basin 35 feet deep, 1,300 
feet long and 900 feet wide at junction of Hackensack 
and Passaic Rivers; about 4.7 miles. (b) A branch 
channel in Newark Bay 37 feet deep in rock and 35 feet 
deep in other material, 800 feet wide at entrance and 
600 feet wide to inshore channel at Port Newark 
terminal, widened at the turn, thence an inshore 
channel of same depths and 400 feet wide; about 1.6 
miles. (c) Maintenance to 35 feet deep of channels at 
Port Elizabeth as follows; A Branch Channel 500 to 1, 
050 feet wide with widening to 1,300 feet at north 
corner of entrance, extending 3,500 feet from main 
channel in Newark Bay to Inshore Channel; an 
Inshore Channel, 500 feet wide, extending westward 
from Branch Channel for 5,250 feet; a South Branch 
Channel, with a minimum width of 550 feet, extending 
1,250 feet from main channel in Newark Bay to east 
bulkhead at Port Elizabeth; a South Channel, 200 feet 
wide, extending westward along south bulkhead at 
Port Elizabeth for 3,100 feet; an East Channel at Port 
Elizabeth, 200 feet wide, extending along east 
bulkhead for 3,750 feet; and at Port Newark an east 
channel connecting Port Elizabeth and Port Newark, a 
distance of 4,150 feet. (d) Hackensack River; A 
channel 34 feet deep in rock and 32 feet in other 
material and 400 feet wide from upper end of Newark 
Bay channel to Central Railroad of New Jersey bridge 
about 1.1 miles; thence 32 feet deep and 300 feet wide 
to a point about 2,000 feet north of Eric Lackawanna 
(formerly Delaware, Lackawanna & Western RR) 
bridge, 2.8 miles; with a turning basin 25 feet deep at 
upper end of channel; thence 15 feet deep, 200 feet 
wide, for 10.1 miles to Little Ferry; thence 15 feet deep, 
150 feet wide to New York, Susquehanna and Western 
Railroad bridge. Total length about 16.5 miles (e) 
Passaic River; A channel 30 feet deep and 300 feet 
wide, from Newark Bay to a point 3,000 feet above 
Lincoln Highway Bridge, 2.6 miles; thence 20 feet deep 
and 300 feet wide to Jackson Street Bridge, 2 miles; 
thence 16 feet deep and 300 feet wide to Nairn 
Linoleum works, 2.4 miles; thence 16 feet deep and 200 
feet wide to Montclair & Greenwood Lake Railroad 
bridge, about 1.1 miles; thence 10 feet deep and 150 
feet wide to Eighth Street Bridge at Passaic, 7.3 miles, a 
total distance for Passaic River of 15.4 miles. All depths 
refer to plane of mean low water. Mean tidal range in 
Newark Bay is 4.9 feet; in Hackensack River at Court 
Street Bridge, 5.5 feet; in Passaic River at 
Pennsylvania Railroad freight bridge, 5.2 feet; and in 
Passaic River at Gregory Avenue Bridge, 5.5 feet; 
mean range of spring tides, 5.9, 6.6, 6.3, and 6.5 feet, 
respectively; irregular fluctuations due to wind and 
barometric pressure vary from 4.3 feet below mean low 
water up to 6.0 feet above mean high water. Estimate of 
cost for new work for active portion of existing project 
consisting of channels described above, is $35,905,600 
(July 1970), exclusive of amounts expended on 
previous projects; and including both $285,600 
contributed by local interests, and $4,700,000 (July 
1970) to be continued by local interests. Dredging 
Passaic River to 20 feet deep and 300 feet wide from 
Jackson Street Bridge about 2.4 miles to Nairn 
Linoleum works, is considered inactive and excluded 
from foregoing description and cost estimate. 
Estimated cost (1954) of this portion is $1,182,000. (See 
Table 2-B for authorizing legislation.) 
Local cooperation. River and Harbor Act of 1954 
provides local interests furnish lands, rights-of-way, 
and suitable spoil-disposal areas for initial construction 
and future maintenance; provide depths 
commensurate with channel depth in approaches and 
berths at terminals of companies which would use 
improvement; and hold the United States free from 
damages. River and Harbor Act of 1962 provides that 
local interests must provide lands, easements and 
rights-of-way for maintenance and construction, hold 
the United States free from damages, provide and 
maintain adequate public terminal and transfer 
facilities, and provide and maintain depths in berthing 
areas at terminals. Assurances were furnished by Port 
of New York Authority and accepted June 12, 1964. 
Local cooperation required by previous modifications 
is fully complied with. 
Terminal facilities. See Port Series No. 5, revised 1965, 
Vol. 2, Part 2, pages 354-399. 
Operations and results during fiscal year. New work: 
Under a continuing contract for stripping in Newark 
Bay south of the C.R.R. of N.J. Bridge (Contract No. 1) 
work began June 5, 1970 and continued. Removed 232, 
470 cubic yards, place measurement of material at a 
cost of $122,498, including $28,406 for engineering 
preliminary to new work. Under a proposed contract 
for dredging the maneuvering area north of the C.R.R. 
of N.J. Bridge in Newark Bay (Contract No. 3) $27,336 
was expended, including $22,963 for engineering 
preliminary to dredging for new work. Maintenance: 
Surveys to determine condition of the waterway cost 
$1,195. 
Condition at end of fiscal year. Work under the active 
portion of project began August 1907 and is about 38 
percent complete. Hackensack River is navigable 20.5 
miles above mouth to New Milford. Passaic River is 
navigable 16 miles above mouth to Dundee Rapids. 
Work remaining to complete existing project consists of 
the following; (a) Newark Bay - Widening 35-foot 
channel and entrances into Port Elizabeth and Port 
Newark, providing two maneuvering areas, deepening 
and widening 32-foot channel, providing a turning 
90

NEW YORK, N.Y., DISTRICT 
basin at junction of Hackensack and Passaic Rivers; 
(b) Hackensack River - Dredging 32-foot channel and 
deepening 12-foot channel to 15 feet; (c) Passaic River- 
Dredging 20-foot channel from Jackson Street to 
Nairn Linoleum Works (inactive). Work in Passaic 
River includes removing a small quantity of rock on 
west side of channel above Center Street Bridge. 
Adjacent property owners are opposed to this work. 
Total cost of active portion of existing project to June 
30, 1970 was $16,792,271 of which $10,200,500 was for 
new work ($9,914,450 U.S. funds and $285,600 
contributed funds, required), and $6,592,221 for 
maintenance. 
17. NEW YORK AND NEW JERSEY 
CHANNELS 
Location. Extend from deep water northwest of Sandy 
Hook, through Lower New York Bay and Raritan Bay, 
to Perth Amboy, and thence through Arthur Kill, 
lower Newark Bay, and Kill Van Kull to deep water in 
Upper New York Bay. This route is approximately 
along boundary line between States of New York and 
New Jersey. (See Coast and Geodetic Survey Charts 
285, 286, and 369.) 
Previous projects. For details see 1963 Annual Report, 
pages 184 and 185. 
Existing project. A channel through Lower New York 
Bay, Raritan Bay, Arthur Kill, lower Newark Bay, and 
Kill Van Kull to Upper New York Bay, depths of 37 
feet in rock and 35 feet in soft material throughout, 600 
feet wide across Lower New York Bay and Raritan Bay 
and in Arthur Kill to a point 1,000 feet north of Smith 
Creek, widened to 800 feet in vicinities of Seguine Point 
and Wards Point, respectively, thence 500 feet wide to 
a point 1,000 feet south of Piles Creek, thence 500 to 
600 feet wide and passing north of Shooters Island and 
protected by a dike on its northern side to junction of 
channel into Newark Bay; thence 800 feet wide 
through Kill Van Kull to Constable Hook, thence 1, 
000 feet wide from a point opposite the east end of 
Constable Hook to a point near the intersection with 
the channel along New Jersey pierhead line and thence 
1,400 feet wide through Kill Van Kull to Upper New 
York Bay; with an anchorage 38 feet deep to 
accommodate five vessels south of Perth Amboy, all 
with suitable easing at bends and junctions. Section 
included in project is 30.8 miles long. In addition, 
construction of a dike north of Shooters Island and two 
secondary channels 30 feet deep and 400 feet wide, one 
south of Shooters Island and the other in Raritan Bay 
connecting with Raritan River, were completed under 
previous projects and maintained under existing 
project. All depths refer to plane of mean low water. 
Mean range of tides varies between 4.7 and 5.1 feet; 
mean range of spring tides, 5.7 to 6.3 feet; irregular 
fluctuations due to wind and barometric pressure vary 
from 3.9 feet below mean low water up to 6.9 feet above 
mean high water. New work for completed project cost 
$60,273,012, including $7,712 contributed by local 
interests, and costs of $22,861 to be transferred to 
construction of Staten Island Rapid Transit Bridge, 
and exclusive of amounts expended on previous 
projects. Anchorage at Sandy Hook, and cutoff at 
junction of Main Ship Channel are in deferred for 
restudy category and excluded from foregoing 
description and cost estimate. Estimated cost of this 
portion (1957) is $2,150,000. (See Table 2-B for 
authorizing legislation.) 
Local cooperation. See page 170, 1962 Annual Report 
for requirements under acts of May 28 and August 30, 
1935. See page 156, 1965 Annual Report for 
requirements under act of May 17, 1950. See page 168, 
1966 Annual Report for requirements under act of 
October 27, 1965. 
Terminal facilities. See Port Series No. 5, revised 1965, 
Vol, 2, Part 2, pages 282-342. 
Operations and results during fiscal year. Hopper Dredge 
Goethals and attendant plant were employed 
intermittently from July 1 through August 15, 1969 in 
dredging to restore project depth of 35 feet in Lower 
Entrance Channels. Removed 585,946 cubic yards, 
place measurement, of material at a cost of $469,659, 
including $4,940 for engineering preliminary to 
dredging for maintenance. Under a contract for 
dredging to restore project depth of 35 feet in the 
channel north of Shooters Island, $42,131 was 
expended, including $33,897 for engineering 
preliminary to dredging for maintenance. 
Reconnaissance surveys cost $4,490. 
Condition at end of fiscal year. Work under active 
portion of existing project began in October 1933 and 
was completed in September 1968. Work completed 
consists of providing authorized project depth and 
widths throughout entire channel from Lower New 
York Bay to Upper New York Bay and providing 
depths of 37 and 25 feet in Perth Amboy Anchorage. In 
addition to above mentioned work, construction of a 
dike north of Shooters Island, two secondary channels 
30 feet deep and 400 feet wide, one south of Shooters 
Island, the other in Raritan Bay connecting with 
Raritan River were completed under previous projects. 
Work remaining under existing project consists of 
dredging cutoff at junction of Main Ship Channel to 
dimensions authorized by River and Harbor Acts of 
August 30, 1935, and May 17, 1950, and dredging 
anchorage in vicinity of Sandy Hook, and widening 
and deepening of Kill Van Kull authorized by River 
and Harbor Act of 1965. (See Table 2-E for total costs 
for existing project toJune 30, 1970.) 
18. NEW YORK HARBOR-COLLECTION 
AND REMOVAL OF DRIFT 
Location. Applies to Lower and Upper Bays, New 
York Harbor; East River, Harlem River, Hudson 
River Channel, N.Y., New York and New Jersey 
Channels, Newark Bay, N.J., and their tributaries. 
91

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Existing project. Collection and removal of drift from 
New York Harbor and its tributary waters, and 
authorizes Secretary of Army to allot such amounts as 
may be necessary for work from appropriations for 
maintenance and improvement of existing river and 
harbor works or other available appropriations, and 
that this work shall be carried as a separate and distinct 
project. It is wholly a work of maintenance. Purpose of 
work is to afford relief from variable conditions of 
obstruction, and no advance estimate of amount of 
work required and its proper cost can be made. (See 
Table 2-B for authorizing legislation.) 
Local cooperation. None required. 
Operations and results during fiscal year. U.S. drift 
collector Driftmaster, steam lighter Gorham, motor 
tenders Daly and Stanwix and auxiliary plant were 
assigned the work of removing and disposing of drift 
when not employed on other work. Removed and 
disposed of 390,135 cubic feet (3,048 cords) of 
driftwood, ranging in size from small blocks to timbers 
of large dimensions, including piles and pieces of 
wreckage at a cost of $802,494 for maintenance. Under 
a continuing contract for construction of a land based 
over-fire air pit incinerator at Caven Point Terminal, 
work previously commenced continued through the 
year. Costs of $755,239 were incurred, including $88, 
882 for preliminary engineering. 
Condition at end of fiscal year. Existing project is one of 
continuous maintenance for which no percentage of 
completion exists. Navigation has been made safer by 
continual patrol of harbor and removal of large 
quantities of drift material. 
19. NEW YORK HARBOR-ENTRANCE 
CHANNELS AND ANCHORAGE AREAS 
Location. In Upper and Lower bays, New York 
Harbor. Harbor is 330 miles southwest by water of 
Boston Harbor, Mass., and 165 miles northeast of 
entrance to Delaware Bay, N.J., and Del. Upper bay 
extends about 5.5 miles southerly from junction of 
Hudson and East Rivers opposite the Battery, New 
York City, to the Narrows. Lower bay extends about 9 
miles from the Narrows to the sea. (See Coast and 
Geodetic Survey Chart 369.). 
Existing project. Ambrose Channel 45 feet deep and 2, 
000 feet wide, extending about 10.2 miles from the sea 
to deep water in the Lower bay; Anchorage Channel, 
an extension of Ambrose Channel, with same depth 
and width, in the Upper bay, opposite anchorage 
grounds, about 5.7 miles long; a southerly entrance 
channel, Sandy Hook Channel (East Section) 35 feet 
deep and generally 800 feet wide extending 3.4 miles 
from 35-foot ocean contour to Bayside Channel along 
an alinement generally west of South Channel; and 
elimination from authorized project of that portion of 
Bayside-Gedney Channel east of junction with new 
southerly entrance channel; for Bayside Channel 35 
feet deep and 800 feet wide, extending about 3.7 miles 
from junction with new southerly entrance channel to 
junction with Main Ship Channel; Main Ship 
Channel 30 feet deep and 1,000 feet wide, extending 
about 5.3 miles from Bayside Channel to deep water in 
Lower bay; a channel along New Jersey pierhead line 
connecting Kill Van Kull with deep water in 
Anchorage Channel, south of Liberty Island 
anchorage, 20 feet deep for 500 feet wide with widening 
at bends to 800 feet and about 3 miles long; an 
anchorage in vicinity of Liberty (Bedloe) Island (about 
160 acres in extent) 20 feet deep, and for removal of 
Craven Shoal to 30 feet deep; for a channel 16 feet 
deep, 200 feet wide, and about 2.3 miles long, 
extending from bell buoy 23 to Hoffman and 
Swinburne Island; for an anchorage area in Red Hook 
Flats to depths of 45, 40, and 35 feet over an area of 928 
acres and an anchorage area in Gravesend Bay to 47 
feet deep over an area of 334 acres. Project depths refer 
to mean low water. Mean tidal range is 4.7 feet at Fort 
Hamilton; mean range of spring tides, 5.7 feet; 
irregular fluctuations due to wind and barometric 
pressure vary from 3.9 feet below mean low water up to 
6.2 feet above mean high water. Cost estimate for new 
work is $67,430,000 (July 1970). (See Table 2-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. See Port Series No. 5, revised 1965, 
Vol. 2., Part 2, pages 343-353 and 400-408. 
Operations and results during fiscal year. New work: 
Hopper Dredge Essayons and attendant plant were 
employed intermittently from July 1 to 31, 1969, in 
dredging to deepen a portion of Red Hook Flats 
Anchorage south of the fairway to 45 feet. Removed 
approximately 260,606 cubic yards, place 
measurement, of material at a cost of $390,492, 
including $39,501 for engineering preliminary to 
dredging for new work. Maintenance: Hopper Dredge 
Hyde and attendant plant were employed 
intermittently from July 1 to August 31, 1969 in 
dredging to restore project dimensions of 35 feet in 
Sandy Hook Channel (East Section). Removed 451, 
990 cubic yards, place measurement of material at a 
cost of $356,252, including $23,750 for engineering 
preliminary to dredging for maintenance. 
Reconnaissance surveys cost $5,558. 
Condition at end of fiscal year. Work under existing 
project began in 1885 and is about 30 percent 
complete. Main Ship and Bayside-Gedney Channels 
were completed to 30 feet deep in February 1891. 
Deepening of Bayside-Gedney Channel to 35 feet for a 
width of 800 feet was completed in June 1939. Ambrose 
Channel was completed to 40 feet deep for a width of 2, 
000 feet in April 1914, and substantially completed to 
45 feet deep for a width of 2,000 feet in 1951. 
Relocation of Anchorage Channel was completed to 40 
feet deep in October 1932. Center 800 feet was dredged 
to 45 feet in June 1947 and westerly 600-foot strip in 
April 1948. Easterly 600-foot strip was substantially 
92

NEW YORK, N.Y., DISTRICT 
completed in June 1953. Channel between Staten 
Island and Hoffman and Swinburne Islands was 
completed in December 1920 up to within 300 feet of 
southerly limits of project. Dredged channel meets all 
needs of navigation and no further work of 
improvement is contemplated for the present. Channel 
along New Jersey pierhead line from Kill Van Kull to 
Anchorage Channel was completed in March 1939. 
Widening at bends near southerly and northerly ends 
authorized in 1948 was completed in November 1960. 
Red Hook Flats anchorage was completed to 40 and 30 
feet and Liberty (Bedloe) Island anchorage was 
completed to 20 feet in October 1944. Sandy Hook 
Channel (east section) was completed to a depth of 35 
feet in June 1963. Work remaining under existing 
project consists of continuation of deepening and 
expanding Red Hook Flats anchorage and deepening 
Gravesend Bay anchorage. 
20. RARITAN RIVER, N.J. 
Location. Rises in north-central part of New Jersey 
and flows generally southeasterly into Raritan Bay, 
between Perth Amboy and South Amboy, about 24 
miles by water south of the Battery, New York City. 
(See Coast and Geodetic Survey Chart 375.) 
Previous projects. For details see Annual Reports for 
1915, 1918, and 1938, pages 1777, 359 and 259, 
respectively. 
Existing project. A channel 25 feet deep and 300 feet 
wide extending 5.8 miles from turn in New York and 
New Jersey Channels near Great Beds Light to 
Government wharf on main channel, widened to 600 
feet for 1,000 feet long opposite wharf to form a turning 
basin of same depth; thence a channel 15 feet deep and 
200 feet wide 3 miles to Washington Canal; thence 10 
feet deep in soft material, 11 feet deep in rock, and 
generally 100 feet wide with widening at bends 5 miles 
to Delaware and Raritan Canal entrance at New 
Brunswick; and a south channel 25 feet deep and 300 
feet wide 0.8 mile from junction with main channel at 
Keasby to upper limit of Titanium Pigment Co. 
property; thence 15 feet deep and 150 feet wide 0.4 
mile to dock of Middlesex County Sewerage Authority; 
thence 10 feet deep and 150 feet wide 2 miles to a point 
1,300 feet below upper junction with Main Channel at 
Crab Island. Plane of reference is mean low water. 
Mean range of tides is 5.1 feet at mouth of river and 5.6 
feet at New Brunswick; mean range of spring tides, 6.1 
and 6.6 feet, respectively. Irregular fluctuations due to 
winds and barometric pressure vary from 3.6 feet below 
mean low water up to 6.9 feet above mean high water. 
New work for completed portion of project, consisting 
of channels described above cost $1,237,000, exclusive 
of amounts expended on previous projects and 
including $66,000 contributed by local interests. 
Dredging south channel to 10 feet deep and 150 feet 
wide for 1,300 feet to upper junction with main 
channel at Crab Island is considered inactive and 
451-584 0-72-7 
excluded from foregoing description and cost estimate. 
Cost estimate for this portion is $86,000 (1954). (See 
Table 2-B for authorizing legislation.) 
Local cooperation. Complied with except local interests 
must furnish spoil-disposal areas for maintenance of 
25-foot channel from New York & Long Branch 
Railroad bridge to junction of Main and South 
Channels, and in South Channel to Titanium Pigment 
Co. property. River and Harbor Act of 1962, provides 
local interests furnish spoil-disposal areas and 
necessary retaining dikes, bulkheads and 
embankments therefor, required for maintenance of 
improvement, and hold the United States free from 
damages. 
Terminal facilities. See Port Series No. 5, revised 1965, 
Vol. 2, Part 2, pages 274-279 and 281. 
Operations and results during fiscal year. Under a contract 
for dredging to restore project depth of 25 feet in South 
Channel, work began January 27, 1970 and was 
completed March 30, 1970. Removed 91,858 cubic 
yards, place measurement of material at a cost of $138, 
785 for maintenance, including $18,600 for 
engineering and design. Reconnaissance surveys cost 
$1,260. 
Condition at end of fiscal year. Entire existing project is 
about 96 precent complete. Work under active portion 
of existing project was commenced September 1919 
and completed July 1941. A shoal along northerly 
channel line in vicinity of Victory Bridge was 
eliminated by relocation of channel in February 1959. 
Main Channel dredged 25 feet deep and 300 feet wide 
from junction with New York and New Jersey 
Channels to and including a turning basin of same 
depth opposite Government wharf, thence 15 feet deep 
and 200 feet wide to mouth of Washington Canal, 
thence 10 and 11 feet deep and 100 feet wide to 
Delaware and Raritan Canal outlet locks at New 
Brunswick. South Channel dredged 25 feet deep and 
300 feet wide for 3,200 feet, thence 10 feet deep and 150 
feet wide for 12,400 feet to within 1,300 feet of junction 
with Main Channel at Crab Island. Model study of 
Raritan River was completed in March 1952. 
Work remaining under existing project is dredging 
South Channel to 10 feet deep and 150 feet wide for 1, 
300 feet to upper junction with Main Channel at Crab 
Island. 
Total cost of active portion of existing project to June 
30, 1970 was $7,341,463 - $878,315 regular funds, $292, 
685 advance funds, and $66,000 contributed funds, a 
total of $1,237,000 for new work, and $6,104,464 U.S. 
funds for maintenance. 
21. SHREWSBURY RIVER, N.J. 
Location. Mainly a large tidal basin in eastern part of 
New Jersey, the outlet being at the southeast end of 
Sandy Hook Bay, about 4 miles south from the point of 
Sandy Hook. (See Coast and Geodetic Survey Chart 
824.) 
3

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Previous Projects. For details see Annual Reports of 
1915, 1918, and 1938, pages 1778, 373, and 267, 
respectively. 
Existing project. A channel 12 feet deep and 300 feet 
wide, following the westerly shore, from deep water in 
Sandy Hook Bay 2.2 miles to a point 600 feet south of 
former location of railroad bridge at Highlands; then 9 
feet deep and generally 150 feet wide, suitably widened 
at bends and turns, in south branch of river 6.8 miles to 
Branchport Avenue Bridge in city of Long Branch; and 
a channel in north branch 6 feet deep and 150 feet wide 
6.1 miles from the junction to Red Bank. Plane of 
reference is mean low water. River and Harbor Act of 
1965 modified existing project to include an inlet 
channel across base of Sandy Hook Peninsula between 
Spermaceti Cove and Island Beach connecting the 
Atlantic Ocean with Shrewsbury River. The ocean 
channel to be 15 feet deep, 200 feet wide and 830 feet 
long protected by parallel jetties spaced 500 feet apart 
and through the land cut to be protected by bulkheads 
in extension jetties; thence a bay channel 9 feet deep, 
200 feet wide, and 2,860 feet long extending to existing 
Shrewsbury River channel. Plane of reference is mean 
low water. New inlet is to be spanned by a 6-lane fixed 
highway bridge with a vertical clearance of 35 feet 
above mean high water and a total length of 1,560 feet. 
Mean range of tide at Highlands, 3.8 feet; at Seabright, 
1.7 feet; at Branchport, 1.7 feet; and at Red Bank, 3 
feet. Mean range of spring tides is 4.7, 2.1, 2.2, and 3.6 
feet, respectively. Irregular fluctuations due to wind 
and barometric pressure vary from 1.9 feet below mean 
low water up to 6.5 feet above mean high water. 
Estimate of cost for new work is $12,144,000 (July 
1970) including $5,800,000 to be contributed and $36, 
300 already contributed by local interests and exclusive 
of amounts expended on previous projects. Dredging 
turning basin and anchorage in vicinity of Red Bank, 6 
feet deep and about 19 acres in area; a channel in 
Claypit Creek, 6 feet deep and 100 feet wide about 1 
mile from 6-foot curve in north branch to head of the 
creek; a channel in Oceanport Creek, 6 feet deep, 100 
feet wide and 2 miles long from channel in south 
branch to New York and Long Branch Railroad 
Bridge; and a channel in Little Silver Creek, 6 feet 
deep, 100 feet wide, and 1.6 miles long from channel in 
south branch to Seven Bridge Road Bridge is 
considered inactive and excluded from foregoing 
description and cost estimate. Cost estimate for this 
portion (1960) is $578,000 exclusive of $86,000 to be 
contributed by local interests. (See Table 2-B for 
authorizing legislation.) 
Local cooperation. River and Harbor Act of 1950 
provides local interests furnish lands, rights-of-way, 
and spoil-disposal areas for construction and future 
maintenance; hold the United States free from 
damages; provide and maintain a suitable public 
wharf on each of the creeks to be improved, which shall 
be open to all on equal terms; remove Locust Avenue 
Bridge over Claypit Creek; and make cash 
contributions of $25,000, $33,000, and $27,500 toward 
cost of improvement of Claypit, Oceanport, and Little 
Silver Creeks, respectively. Provided further that 
construction of any unit of proposed improvement may 
be undertaken independently of the other units when 
the required local cooperation has been provided. 
These conditions have not been fulfilled. Requirements 
under prior acts have been fully complied with. River 
and Harbor Act of 1965 provides that local interests 
furnish lands, rights-of-way outside of the Federally 
owned lands, for construction and future maintenance 
and for aids to navigation upon request of the Chief of 
Engineers, including suitable spoil-disposal areas, and 
necessary retaining dikes, bulkheads, and 
embankments therefor or the costs of such retaining 
works; hold the United States free from damages; 
assume all obligations of owning, operating and 
maintaining highway bridge, with such obligations to 
be assumed by local interests upon final completion of 
its construction; assign to a competent and properly 
constituted public body the power to regulate the use, 
growth, and free development of adequate boating 
facilities in the area to be served by the inlet, with the 
understanding that such facilities will be open to all 
equally; and provide, maintain, and operate necessary 
mooring and terminal facilities and utilities including 
an adequate public landing or wharf with provisions 
for the sale of motor fuel, lubricants and potable water, 
available to all equally. Requirements under 1965 
River and Harbor Act have not been complied with. 
Terminal facilities. There are 33 terminals with a total 
berthage of 7,986 feet on the waterway. Eight terminals 
with a total berthage of 1,000 feet are open to the 
public. In addition, many private pleasure boat 
landings have been constructed by owners of riverfront 
estates. Fifteen boatyards with storage space for 670 
craft and equipped with 21 marine railways are 
available. None of the terminals has direct rail 
connections. Facilities considered adequate for existing 
commerce. 
Operations and results during fiscal year. New work: 
Advance engineering and design for work authorized 
by the River and Harbor Act of 1965 was continued. 
Model study at Waterways Experiment Station was 
completed. Costs for new work were $92,115 for design 
engineering and $17,781 for supervision and 
administration. 
Condition at end of fiscal year. Work under the active 
portion of existing project began in October 1919 and is 
about 10 percent complete. Work completed consisted 
of providing authorized project dimensions in 12-foot 
entrance channel, 9-foot channel in South Branch, and 
a 6-foot channel in North Branch of the river. Work 
remaining under the existing project consists of 
dredging an inlet channel across the base of Sandy 
Hook protected by jetties and bulkheads, a bay 
channel extending to the existing Shrewsbury River 
Channel and a six-lane fixed highway bridge to span 
the new inlet as authorized by the River and Harbor 
94

NEW YORK, N.Y., DISTRICT 
Act of 1965. Preconstruction planning (advance 
engineering and design) for work under this Act is 
about 42 percent complete. In addition, under the 
River and Harbor Act of 1950 work remaining consists 
of dredging turning basin and anchorage in vicinity of 
Red Bank, and channels in Claypit, Oceanport, and 
Little Silver Creeks. 
Total cost of existing project to June 30, 1970, was 
$1,794,550 of which $905,833 was for new work ($869, 
522 U.S. funds and $36,311 contributed funds, 
required) and $888,717 for maintenance. 
22. WESTCHESTER CREEK, N.Y. 
Location. A tidal stream flowing into East River from 
north at a point 14 miles by water northeast of the 
Battery, New York City. (See Coast and Geodetic 
Survey Chart 223.) 
Previous projects. For details see Annual Reports for 
1921 and 1938, pages 238 and 164, respectively. 
Existing project. A channel 12 feet deep at mean low 
water, 100 feet wide for 2,000 feet through the estuary; 
thence 80 feet wide for 3,000 feet; and thence 60 feet 
wide 8,800 feet to head of navigation at East Tremont 
Avenue (Fort Schuyler Road), with widening at bends, 
and two turning basins, one near upper end of channel, 
the other near Eastern Boulevard (Unionport) Bridge. 
Project is about 2.6 miles long. Mean tidal range, 7 
feet; mean range of spring tides, 8.4 feet; irregular 
fluctuations due to wind and barometric pressure vary 
from 3.9 feet below mean low water up to 8.4 feet above 
mean high water. New work for completed active 
portion of the project cost $98,751 exclusive of amounts 
expended on previous projects. Dredging turning basin 
to a depth of 12 feet below mean low water, 250 by 250 
feet in extent, 500 feet downstream from head of 
navigation, is inactive and excluded from foregoing 
description and cost estimate. Estimated cost of this 
portion (1965) is $38,000. (See Table 2-B for 
authorizing legislation.) 
Local cooperation. River and Harbor Act of 1954 
provides that local interests agree to furnish lands, 
easements, and rights-of-way for construction and 
maintenance and furnish suitable spoil-disposal areas 
for initial work and future maintenance as required; 
hold the United States free from damages; and provide 
and maintain a suitable bulkhead or other works 
approved by Chief of Engineers for retaining the east 
bank of the turning basin alongside Hutchinson River 
Parkway; and that local interests give assurances they 
will construct a public wharf when required. 
Requirements under prior acts have been fully 
complied with. 
Terminal facilities. See Port Series No. 5, revised 1965, 
Vol. 2, Part 2, pages 221-223. 
Operations and results during fiscalyear. Under a contract 
for dredging to restore project depth of 12 feet in entire 
channel, work began May 16, 1970 and was completed 
June 13, 1970. Removed 55,644 cubic yards, place 
measurement, of material at a cost of $156,264 
including $17,836 for engineering preliminary to 
dredging for maintenance. Reconnaissance surveys 
cost $3,643. 
Condition at end of fiscal year. Work under entire 
existing project is about 82 percent complete. Work 
under active portion of existing project commenced 
March 1932 and was completed May 1933. Upper 0.5 
mile of the channel was relocated by city of New York 
in 1941. Head of navigation is at East Tremont 
Avenue, Bronx, about 2.6 miles above the mouth. 
Work remaining under existing project consists of 
dredging to 12 feet below mean low water a turning 
basin 250 by 250 feet in extent to be 500 feet 
downstream from head of navigation. Total cost of 
active portion of existing project to June 30, 1970, was 
$1,148,077 of which $98,751 was for new work and $1, 
049,326 for maintenance. 
23. SUPERVISION OF NEW YORK 
HARBOR 
(Prevention of Obstructive and Injurious Deposits) The 
Supervisor of New York Harbor is charged under 
Federal Statutes with the mission of preventing 
obstructive or injurious deposits in New York Harbor 
and its adjacent or tributary waters, including Long 
Island Sound, and the prevention of anchorage in 
entrance channels of the Harbor to promote safe 
navigation of deep-draft vessels. 
Federal laws enforced by the Supervisor of New 
York Harbor to accomplish his mission are; Act of 29 
June 1888 (25 Stat. 209), as amended by Section 3, 
River and Harbor Act of August 1894 (28 Stat. 360), 
Section 8, River and Harbor Act of 28 May 1908 (35 
Stat. 424), Act of 16 February 1909 (35 Stat. 623), and 
Act of 12 July 1952 (66 Stat. 5596); Section 2, River 
and Harbor Act of 18 August 1894 (28 Stat. 360), as 
amended 28 August 1958 (72 Stat. 970); Act of 3 
March 1899 (Refuse Act, 30 Stat. 1152); Act of 7 June 
1924 (Oil Pollution Act, 43 Stat. 604), as amended by 
the Clean Water Restoration Act of 1966, (PL 89-753), 
and Act of 30 August 1961 (Oil Pollution Act, 75 Stat. 
402), as amended by Dept. of Transportation Act (PL 
89-670; 80 Stat. 931). 
The waters under the jurisdiction of the Supervisor 
of New York Harbor include New York Harbor and its 
tributaries, Raritan River, Arthur Kill, Newark Bay, 
Hackensack and Passaic Rivers, Kill Van Kull, 
Hudson River and its tidal tributaries to the Federal 
Lock and Dam at Troy, New York, the East River and 
its tributaries, Harlem River and Long Island Sound. 
The area encompasses approximately 700 miles of 
waterways, 1,600 miles of waterfront and 1,500 square 
miles of water surface area. Patrol vessels are used to 
accomplish waterways inspections. Two vessels 
maintain 24-hour, 7-day weekly patrols; one in the 
Lower Bay, and the other in Long Island Sound, to 
inspect vessels carrying dredged or other types of waste 
S 95

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
material that is to be deposited in dumping grounds 
established by the Supervisor of New York Harbor. 
These vessels also patrol the entrance channels to keep 
them clear of interference by fishing craft or other boats 
in order to ensure safe navigation of deep-draft vessels. 
One other vessel patrols the inner waters, such as 
Hudson River, East River, Kill Van Kull, Arthur Kill, 
Passaic and Hackensack Rivers, on an 8-hour a day 
basis, 5 days a week, to prevent the illegal deposit of 
cellar dirt, ashes, industrial waste, oil or any other 
refuse into the navigable waters or on the beach or 
shore areas where it may be subject to tidal action and 
become a hazard to navigation. Inspections of 
shorefront facilities, such as industrial plants, oil 
refineries and shipyards are conducted 8 hours a day, 5 
days a week by Inspectors utilizing Government 
vehicles equipped with two way radios to ensure that 
industrial waste or refuse is not being discharged into 
the navigable waters. These Inspectors operate out of 
various field offices located at Caven Point, New 
Jersey, Fort Totten in Bayside, New York, Fort Tilden 
at Rockaway, New York, and offices in Kingston and 
Troy, New York. 
An aggressive educational program has been 
maintained to inform the public of anti-pollution laws. 
During FY 1970 the program consisted of posting 
weatherproof warning signs at appropriate locations 
along the waterfront; distribution of Special Notices 
(containing extracts of pertinent Federal Statutes) to 
marinas, yacht clubs and the shipbuilding industry; 
issuance of press releases; talks before civic 
organizations and several radio and television 
interviews concerning pollution of the U.S. navigable 
waters. (See Table 2-F for statement of activities.) 
24. RECONNAISSANCE AND CONDITION 
SURVEYS 
(See Table 2-G at end of chapter.) 
25. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See Table 2-H at end of chapter.) 
26. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION Navigation activities 
pursuant to section 107, Public Law 86-645 
(preauthorization.) 
Fiscal year costs for preauthorization studies were 
$677 to complete studies of Catskill Creek, Catskill, 
N.Y.; $11,319 to continue studies on Cumberland Bay, 
Lake Champlain (Plattsburg Harbor), N.Y. initiated 
in FY 1967; $1,580 to start and complete 
reconnaissance report on Dead Horse Bay, N.Y. $8,303 
to start study on Lake Champlain (Sandbar) Vt., $388 
to continue study on Larchmont Harbor, N.Y. $1,192 
to submit Detailed Project Report on Patchogue River 
(& Great South Bay), N.Y. initiated in FY 1968; and 
$6,136 to continue Valcour Harbor, Lake Champlain, 
N.Y. started in FY 1967. 
ALTERATION OF BRIDGES 
27. STATEN ISLAND RAPID TRANSIT 
RAILWAY CO. BRIDGE ACROSS 
ARTHUR KILL, N. Y. 
Location. Crosses Arthur Kill, New York and New 
Jersey Channels about 1.5 miles south of Newark Bay 
and connects Elizabeth, N.J., with Staten Island, N.Y. 
(See Coast and Geodetic Survey Chart 369.) 
Existing project. A new railroad bridge to replace 
single track swing bridge completed in 1888. Center 
pier and fender system of existing bridge result in 
inadequate horizontal clearances which present a 
serious obstruction and hazard to navigation. New 
bridge provides a vertical lift span with vertical 
clearances of 135 feet above mean high water in open 
position and 31 feet above mean high water in closed 
position. New bridge eliminates center pier and leaves 
a clear and unobstructed channel 500 feet wide. Center 
of new span is about 158 feet east of center of existing 
bridge. Notice to alter existing bridge was signed by 
Secretary of the Army onJuly 5, 1949, as authorized by 
Truman-Hobbs Act of June 21, 1940, as amended. 
Estimated Federal share of cost of new work is $7,995, 
000 (July 1969). Estimated cost to local interests is $1, 
635,000. 
Local cooperation. Fully complied with. 
Operation and results during fiscal year. Work by legal 
counsel of the Railway Company in connection with 
outstanding claims continued. There were no Federal 
costs. 
Condition at end of fiscalyear. Project was operationally 
completed, first train crossed new bridge August 1959. 
Construction under contract No. 1 for substructure was 
completed August 1958. Construction under contract 
No. 2 for superstructure was completed December 
1959. Work under terminated contract No. 3 and 
subsequent new contract, for demolition of structures 
and construction of fender system was completed in 
August 1962. Work remaining consists of resolution of 
several claims, final payments and credits. 
BEACH EROSION CONTROL 
28. FIRE ISLAND INLET, LONG ISLAND, 
N.Y. 
Location. Atlantic Coast of Long Island, N.Y., 
between Fire Island Inlet and Jones Inlet, about 15 
miles. Fire Island Inlet is on south shore of Long Island, 
about 50 miles by water south and east of the Battery, 
New York City, and connects Great South Bay and the 
Atlantic Ocean. Jones Inlet is on south shore of Long 
Island, about 37 miles by water south and east of the 
Battery, New York City, and connects Hempstead Bay 
96

NEW YORK, N.Y., DISTRICT 
and the Atlantic Ocean. (See Coast and Geodetic 
Survey Charts 578 and 579.) 
Existing project. Provides for Federal participation in 
restoration and protection of shore from Fire Island to 
Jones Inlets by dredging inlet shoal in Fire Island Inlet 
and construction of a sand dike to relieve pressure of 
tidal currents against Oak Beach, to provide a 
deposition area for littoral drift, and to obtain fill 
material for a feeder beach and Oak Beach. 
Authorization initially provided for three dredging 
operations over a period of 10 years, but was reduced to 
two, based on subsequently authorized project 
modification for sand bypassing facilities and on 
limited reduction of channel maintenance costs of 
navigation project. 
For first increment, based on cost sharing provisions 
of Public Law 727, 79th Congress, pertinent to beach 
erosion control benefits, Federal participation is 
authorized to extent of one-third of costs allocated to 
beach erosion control feature and entire cost allocated 
to navigation feature, a total of 42 percent for first 
increment. In accordance with authorizing document, 
Federal shares of subsequent increments would be 
based on the then current estimates of maintenance 
costs which can be justified for navigation project and 
experience with maintenance requirements. Based on 
provisions of 1962 River and Harbor Act enacted after 
completion of first increment, which modified Federal 
participation to extent of one-half of costs allocated to 
beach erosion control feature, and on deletion of 
navigation benefits based on maintenance experience, 
Federal share of second increment was evaluated at 
67.9 percent. 
Project, as modified, provides for combined beach 
erosion control and navigation improvements 
comprising a 1,000-foot extension of existing jetty, a 
littoral reservoir with a capacity of 1,200,000 cubic 
yards west of jetty, a navigation channel 28 feet deep 
and 500 feet wide leading from the littoral reservoir to a 
deposition reservoir inside the inlet with a capacity of 2 
million cubic yards, and other appurtenant works 
including jetty modifications to permit fishermen use, 
and dikes. Estimated Federal share of participation is 
66.1 percent of the first cost of project modification. 
Periodic transfer of littoral drift involving the 
bypassing of 1,200,000 cubic yards of sand on the 
average of once every 2 years to a feeder beach over the 
economic life of the project, serving both maintenance 
of navigation channel and nourishment of beaches 
westerly of the inlet, is included in annual 
maintenance. Project is also known as "Fire Island 
Inlet to Jones Inlet, N.Y." Mean range of tide is 4.1 
feet. Total estimated Federal cost of new work is $16, 
586,767 (July 1970), of which $2,646,767 is for work 
authorized by 1958 River and Harbor Act (H. Doc. 
411, 84th Cong., 2d sess.), and $13,940,000 for 
modification authorized by 1962 River and Harbor 
Act (in accordance with plans in H. Doc. 115, 89th 
Cong., 1st sess. as approved by the Secretary of the 
Army and the President on February 20, 1965). Project 
documents contain latest published maps. 
Local cooperation. River and Harbor Act of 1958 
provides local interests obtain approval by Chief of 
Engineers, before starting work on any feature of 
project, of detailed plans and specifications and 
arrangements for prosecuting work on that feature; 
provide lands, and rights-of-way; hold the United 
States free from damages; assure that water pollution 
that would endanger health of bathers will not be 
permitted; assure maintenance of recommended 
project during its useful life as may be required to 
insure realization of anticipated benefits; and assure 
continued public ownership of the shore and its 
administration for public use during economic life of 
project. Long Island State Park Commission of State of 
New York, the cooperating agency, entered into an 
agreement with United States August 21, 1958, as 
modified November 18, 1959, and February 1, 1962, in 
which the agency adopted plan of improvement for 
beach erosion control authorized by Congress and 
agreed to furnish its share of cost, and comply with all 
other requirements of local cooperation. By letter dated 
October 7, 1958, cooperating agency requested United 
States to undertake and supervise construction of first 
increment of work. First modification to agreement 
enabled construction by Federal Government of a sand 
closure across gorge channel which was completed in 
1960 at a cost of $364,000 from funds furnished by 
cooperating agency (contributed funds-other). Second 
modification enabled delineation of sand closure as a 
part of authorized project in accordance with Public 
Works Appropriation Act, 1962, which included $152, 
880 (42 percent of $364,000) specifically for repayment 
of Federal share of cost. Necessary adjustments of 
financial records to reflect revised allocation of costs 
was completed fiscal year 1962, and return of unused 
contributed funds, surplus to needs of first increment, 
was made May 17, 1962. Second dredging operation 
was financially complete April 30, 1966, and return of 
unused required contributed funds, surplus to needs of 
this increment, was made by check in June 1966 and 
transmitted July 7, 1966. In addition to assurances 
similar to those cited for the work under the 1958 act, 
local interests, for the work under the 1962 act, must 
provide and maintain a parking lot with adequate 
sanitary facilities as may be required for recreational 
fishermen use of the jetty extension; and contribute 
about 33.9 percent of total first cost, 32.1 percent of 
periodic dredging cost allocated to beach erosion 
control for beach nourishment, and 9.8 percent of 
maintenance cost. First cost includes costs, shared 
equally between Federal and non-Federal interests, for 
structural modifications to jetty extension to permit 
fishermen use; with maintenance of these modifications 
to be a Federal responsibility. Off-project fishing 
facilities would be a non-Federal responsibility. Total 
estimated cost of local cooperation to be provided by 
local interests is $9,443,835 (July 1970) for new work, of 
97

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
which $2,272,835 (cash contribution) is for work 
authorized by the 1958 act; and $7,173,000 the 1962 
act, of which $7,160,000 is cash contribution and $13, 
000 is other non-Federal costs for off-project facilities; 
exclusive of shares of annual periodic dredging and 
maintenance costs. 
Operations and results during fiscal year. Utilizing 
appropriations for planning of work authorized by the 
1962 Act, advance engineering and design continued 
with the completion of the model test report by the 
Waterways Experiment Station. Draft Design 
Memorandum was completed. Coordination was 
continued with representatives of Federal agencies and 
State and Suffolk County officials. Costs for advance 
engineering and design were $91,147, all Federal for 
new work. 
Condition at end of fiscal year. Under the 1958 Act, the 
first dredging operation is complete at a cost of $1,124, 
826 exclusive of $1,553,331 required contributed funds. 
Second dredging operation is complete at a cost of $1, 
521,941, exclusive of $719,504 required contributed 
funds. Advance engineering and design for work under 
the 1962 act initiated in April 1965 is about 83 percent 
complete. 
29. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECTS 
(See Table 2-I at end of chapter.) 
FLOOD CONTROL 
30. BENNINGTON, HOOSIC RIVER BASIN, 
VT. 
Location. Hoosic River rises in northwestern 
Massachusetts, flows generally north and northwest, 
crossing southwest corner of Vermont to vicinity of 
Eagles Bridge, N.Y., where it turns west and joins the 
Hudson River about 16 miles above Troy, N.Y. It is 66 
miles long and has a drainage area of 713 square miles. 
Bennington, Vt. is at junction of Walloomsac River 
and Roaring Branch, about 15 miles southeast of 
junction of Walloomsac River with Hoosic River at 
North Hoosic, N.Y. (See Geological Survey map 
covering Bennington, Vt., quadrangle). 
Existing project. Provides for channel excavation, 
about 10,500 feet of cribwall, and levee construction 
along the Roaring Branch extending from about 2,000 
feet below the Brooklyn Bridge to about 3,500 feet 
above, with a concrete diversion structure at the head 
of a canal. Existing project was authorized by 1936 
Flood Control Act and modified by 1941 Flood Control 
Act (H.Doc. 182, 76th Cong., 1st sess., contains latest 
published map). The project, previously placed in 
"inactive" category due to its apparently limited 
interest on the part of local interests in supporting 
construction, was reclassified to the "deferred for 
restudy" category January 18, 1965, based on the 
reported gradual erosion of left bank of Roaring 
Branch which local interests believe constitutes a 
serious threat of flooding. Based on the findings of the 
"restudy" (feasibility study report) initiated in 
December 1965 and completed in March 1966, the 
portion of the project on the left bank of the Roaring 
Branch, generally between Branch and Park Streets, 
was reclassified from the "deferred" to the "active" 
category on May 27, 1966. The improvement provides 
for construction of about 272 feet of floodwall, 3,437 
feet of levee and appurtenant drainage facilities. The 
estimated Federal cost for new work is $700,000 (July 
1970), exclusive of land and other work to be provided 
by local interests estimated at $37,000. The remaining 
portion of the authorized project consisting mainly of 
channel clearing and construction of concrete cribwalls 
along Roaring Branch, at an estimated Federal cost of 
$1,840,000 (July 1964) and estimated non-Federal cost 
of $30,000 for lands and other work to be provided by 
local interests was reclassified from the "deferred" to 
the "inactive" category on May 27, 1966. 
Local cooperation. In addition to the usual 
requirements for local cooperation as provided by law, 
local interests must give assurances that they will insure 
against future encroachments upon the flood channels 
to be provided by the improvements. Assurances of 
local cooperation were executed by the chairman of the 
Board of Selectmen, Town of Bennington, Vt. and 
accepted for the United States by the District Engineer 
on April 30 1970. 
Operations and results during fiscal year. Advance 
engineering and design and local coordination were 
completed on the "active" portion of the project. 
Acquisition by the State of Vermont of necessary lands, 
easements and rights-of-way was completed. A 
contract for $490,039 for the active portion was 
awarded May 27, 1970. Costs for new work were $64, 
973 for design engineering. 
Condition at end of fiscal year. Design was completed and 
contract awarded. 
31. EAST ROCKAWAY INLET TO 
ROCKAWAY INLET & JAMAICA BAY, 
N.Y. 
Location. Atlantic coast of New York City, between 
East Rockaway and Rockaway Inlets, and the lands 
within and surrounding Jamaica Bay. The coastal area 
(about 10 miles long) is a peninsula in Queens County 
separating the ocean and the bay. (See Coast and 
Geodetic Survey Charts 70, 369, 542, 579, 1000, 1108, 
and 1215.) 
Existing project. The multi-purpose improvement 
provides for a hurricane barrier, 4,530 feet long, across 
entrance to Jamaica Bay with a 600-foot navigation 
opening and two 150-foot gates which would partially 
close the opening to 300 feet; dikes and levees, 1.2 miles 
long to high ground north from the barrier and dikes, 
levees, and floodwalls, 7.7 miles long, south and east 
from the barrier to and along the'oceanfront to high 
98

NEW YORK, N.Y., DISTRICT 
ground at eastern end of Rockaway peninsula; fill 
placement along the 6-mile oceanfront floodwall with a 
berm 100 to 200 feet wide at 10.0 feet above mean sea 
level; and stoplog structures, stairways, ramps, road 
raising, and other appurtenant works, including fishing 
platforms on hurricane barrier. Project includes 
Federal participation in cost of periodic beach 
nourishment of the shore protection works for 10 years 
after completion of the initial beach fill, the Federal 
share presently estimated at 50 percent of such cost. 
Project was authorized by 1965 Flood Control Act (see 
H. Doc. 215, 89th Cong., 1st sess., for latest published 
map). Estimated Federal cost is $43,220,000 for 
construction (which represents 68 percent of total first 
cost of project reduced by amount of local cash 
contribution presently estimated at $4,520,000 for the 
barrier, its gates and fishing platforms, equivalent to 
the present worth of the annual cost of maintenance, 
operation, and major replacements by the United 
States), and $318,000 annually for periodic 
nourishment for 10 years, a total of $46,400,000 (July 
1970). Maintenance, operation and major 
replacements of the barrier, its gates and fishing 
platforms would be a Federal responsibility. Estimated 
non-Federal cost is $26,980,000 (representing 32 
percent of total first cost of project) consisting of $160, 
000 for lands and alterations and relocations of 
structures, and a cash contribution of $26,820,000; an 
additional cash contribution of $4,520,000 for the 
barrier, its gates and fishing platforms; and $434,000 
annually for periodic nourishment for first 10-year 
period; a total of $31,320,000 exlusive of annual 
maintenance and operation costs for the project 
(except the barrier, its gates and fishing platforms), and 
of the annual cost of periodic nourishment after the 
initial 10 year period. 
Local cooperation. Local interests must provide lands 
and rights-of-way, including borrow areas; alter and 
relocate buildings, streets, storm drains, utilities, and 
other structures; bear 32.0 percent of total first cost 
presently estimated at $26,980,000, consisting of $160, 
000 for items listed above, and a cash contribution of 
$26,820,000, the final apportionment of cost to be 
made after actual costs and values have been 
determined; provide an additional cash contribution 
for the barrier, its gates and fishing platforms, 
equivalent to the present worth of the annual cost of 
maintenance, operation, and major replacements by 
the United States, presently estimated at $4,520,000 
subject to adjustment based on detailed design of 
project features, to be paid in a lump sum before 
starting construction; hold the United States free from 
damages; maintain, during economic life of project, 
continued public ownership and use of non-Federal 
publicly owned shores upon which Federal 
participation in beach protection is based; maintain 
and operate all works after completion, except the 
barrier, its gates, and fishing platforms, and provide 
periodic nourishment during the economic life of the 
hurricane and shore protection works, as may be 
required to serve the intended purpose, subject to 
Federal participation in cost of periodic nourishment of 
shore protection works for an initial period of 10 years; 
control water pollution to the extent necessary to 
safeguard the health of bathers; and at least annually 
inform interests affected that hurricane improvements 
will not provide substantial protection against 
hurricane and storm tide levels higher than about 3 feet 
above the elevation of Hurricane Donna of September 
12, 1960. State of New York Water Resources 
Commission stated that the State would cooperate in 
meeting requirements subject to final development of a 
soundly engineered and economically feasible plan and 
cooperation from local municipalities. 
Operations and results during fiscal year. Advance 
engineering and design continued. Model testing 
completed, and results reviewed on January 15, 1970. 
Design of levees and walls, underway. Costs for 
advance engineering and design were $200,030, all 
Federal. 
Condition at end of fiscal year. Advance engineering and 
design was initiated inJanuary 1967, and is 74 percent 
complete. Completion of engineering and design and of 
construction remain. 
32. ELIZABETH, N.J. 
Location. In city of Elizabeth, N.J. (Union County), 
extending 4.2 miles upstream from mouth of Elizabeth 
River at Arthur Kill. The river continues 7.7 miles 
northward through Union and Essex counties to its 
headwaters in East Orange, N.J. (See Geological 
Survey quadrangles, Roselle, Elizabeth, Caldwell and 
Orange; and Army Map Service quadrangles, 
similarly designated.) 
Existing project. Includes an improved channel with 
levees ancVor walls where necessary between Bridge 
Street and Arthur Kill (2.1 miles); a concrete flume 
between Trotter's Lane and Bridge Street (1.8 miles); 
closure to high ground at upstream and downstream 
ends; interior drainage, including 5 pumping stations 
and 11 ponding areas; reconstruction or replacement of 
16 bridges and associated street regrading; and utilities 
relocations. Project was authorized by 1965 Flood 
Control Act (H. Doc. 249, 89th Cong., 1st sess., 
contains latest published map.) Total estimated 
Federal cost is $15,700,000 (July 1970). Total 
estimated non-Federal cost for all requirements of local 
cooperation excluding maintenance is $5,000,000, 
inclusive of $230,000 cash contribution by local 
interests. 
Local cooperation. Local interests must provide lands 
and rights-of-way for construction, the costs and values 
incurred in the interest of hurricane tidal flood 
protection to be credited to required local contribution 
to the project first costs allocated to hurricane tidal 
flood protection; hold the United States free from 
damages; maintain and operate completed works 
99

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
including all dredging required in the channel to 
maintain the design depths in the tidal reach; 
reconstruct all bridges and approaches except railroad 
bridges, and relocate existing sewerage and drainage 
facilities, streets, utilities, and other structures, such 
costs and values incurred in interest of hurricane tidal 
flood protection to be credited to required local 
contribution to protect first costs allocated to hurricane 
tidal flood protection; bear 30 percent of first costs 
allocated to hurricane tidal flood protection, including 
the two items listed above pertaining to lands, 
reconstruction and alterations, and a cash contribution 
presently estimated at $230,000, to be paid either in a 
lump sum before starting construction, or in 
installments before starting pertinent work items in 
accordance with construction schedules as required by 
the Chief of Engineers; take necessary action to protect 
channels from future obstruction or encroachment 
including waste disposal that would reduce their floodcarrying 
capacity; take appropriate measures to 
control development in partially protected areas and 
fringe areas not included in the project with a view to 
preventing an undue increase in the flood damage 
potential; maintain existing natural detention areas 
along the Elizabeth River between Union Avenue and 
Trotters Lane free from encroachment so as not to 
reduce their detention capacity; provide any 
additional gravity outlets or pumping station capacities 
made necessary by any modifications or 
encroachments on the ponding areas; bear any 
increased Federal costs for the improvement that may 
result from any future requirements for parkway 
developments; and at least annually, notify interests 
affected that the improvements will not provide 
complete protection from fluvial floods greater than 
that in July 1897. Agency responsible for local 
cooperation is city of Elizabeth (with concurrence of 
Union County and State of New Jersey). Signed 
assurances of local cooperation were accepted by the 
District Engineer on January 9, 1970. 
Operation and results during fiscal year. Design 
engineering continued. Design memorandum was 
submitted August 13, 1969 and returned with 
comments on May 14, 1970. Geophysical investigations 
and real estate studies by contract were completed. 
Planning was suspended January 8, 1970. Costs for 
design were $22,825, all Federal. 
Condition at end offiscalyear. Advance engineering and 
design began in January 1966. Design memorandum 
was submitted, but had to be revised. Planning is about 
50% complete. Completion of engineering and design, 
and construction remain. 
33. FIRE ISLAND INLET TO MONTAUK 
POINT, N.Y. 
Location. That portion of Atlantic Coast of Long 
Island extending from Fire Island Inlet easterly to 
Montauk Point, N.Y. Its frontage, which lies entirely in 
Suffolk County, is about 83 miles long and comprises 
about 70 percent of total ocean frontage of Long 
Island. Fire Island Inlet is about 50 miles by water east 
of the Battery, New York City. (See Coast and 
Geodetic Survey Charts 362, 578, 1212 and 1214.) 
Existing project. Provides for Federal participation in 
improvement to prevent beach erosion and hurricane 
damages along Atlantic Coast of Long Island, N.Y., 
from Fire Island Inlet to Montauk Point by; widening 
beaches along developed areas between Kismet and 
Mecox Bay to a minimum width of 100 feet at elevation 
14 feet above mean sea level; raising dunes to an 
elevation of 16 feet above mean sea level from Fire 
Island Inlet to Hither Hills State Park, at Montauk 
and opposite Lake Montauk Harbor; planting grass on 
dunes; constructing gated interior drainage structures 
at Mecox Bay, Sagaponack Lake, and Georgica Pond; 
constructing not to exceed 50 groins, if needed; and 
Federal participation in cost of beach nourishment for 
not to exceed 10 years from year of completion of a 
useful nourishment unit. Total estimated Federal cost 
is $42,720,000 (July 1970) which includes participation 
in periodic beach nourishment for 10 years at $44,000 
annually. Total estimated non-Federal cost for all 
requirements of local cooperation is $42,750,000 (July 
1970), inclusive of $35,140,000 cash contribution by 
local interests. Project cost estimate reflects revised cost 
sharing provisions of 1962 River and Harbor Act, 
which modified Federal participation to extent of onehalf 
of costs allocated to beach erosion control feature, 
in lieu of one-third authorized by Public Law 727, 79th 
Congress. Evaluation resulted in increase in Federal 
participation from about 51 percent as originally 
contemplated, to about 53 percent of first cost of project 
construction, exclusive of annual nourishment costs. 
Existing project was adopted by 1960 River and 
Harbor Act (H. Doc. 425, 86th Cong., 2d sess.). Latest 
published map is in project document. 
Local cooperation. River and Harbor Act of 1960 
provides that before starting construction, local 
interests give assurances they will (a) provide lands, 
rights-of-way, including borrow areas, for construction; 
(b) make alterations and relocations of buildings, 
streets, storm drains, utiltities, and other structures 
made necessary by construction; (c) bear 47 percent of 
total first cost, estimated at $38,070,000, to consist of 
items listed in (a) and (b) above and a cash 
contribution estimated at $35,140,000, or, if any 
section is undertaken separately apportionment of first 
cost will be as shown in District Engineer's report, with 
due regard to change in public use and ownership and 
other changes before construction; provided that cash 
contribution be paid either in a lump sum before 
starting entire project, or in installments before starting 
pertinent items, in accordance with construction 
schedules as required by Chief of Engineers, final 
apportionment of cost to be made after actual costs and 
values have been determined; (d) hold the United 
States free from damages; (e) maintain all works and 
100

NEW YORK, N.Y., DISTRICT 
undertake periodic beach nourishment after 
completion, except that for 10 years after completion of 
a useful nourishment unit Federal Government would 
contribute, dependent on conditions of public use and 
ownership and other changes at time of construction an 
amount for entire project now estimated at $44,000 
annually; (f) maintain during economic life of project 
continued public ownership of non-Federal publicly 
owned shores and continued availability for public use 
of privately owned shore equivalent to that upon which 
recommended Federal participation is based; (g) adopt 
appropriate ordinances to provide for preservation of 
dunes and their protective vegetation; (h) control 
water pollution to extent necessary to safeguard health 
of bathers; (i) obtain approval of Chief of Engineers of 
detailed plans and specifications for work 
contemplated and arrangements for its prosecution 
before starting any work on beach protection phase of 
project for which Federal participation is planned, if 
undertaken separately from recommended combined 
project; and (j) contribute in cash toward cost of 
hurricane protection works constructed under this 
plan, in addition to apportionment required in (c) 
above, an amount equal to increased Federal cost 
resulting from separate construction of beach 
protection work referred to in (i) above. Responsible 
agency is State of New York. On July 30, 1963, the 
State reflecting the desires of Suffolk County, requested 
the inclusion of a minimum of 13 groins in initial 
construction of Moriches-Shinnecock reach. Chief of 
Engineers concurred in inclusion of up to 13 groins. 
Assurances were executed by Superintendent of Public 
Works, State of New York, on August 14 and accepted 
by the District Engineer August 20, 1963. On February 
5, 1964, the State requested consideration of a plan, as 
proposed by Suffolk County, for initial construction of 
13 groins of which 11 would be in the Moriches- 
Shinnecock reach, and 2 in the Southampton-Beach 
Hampton reach in vicinity of Georgica Pond; and that 
sandfill and dune construction be withheld for the 
present except for 1 mile on each side of Shinnecock 
Inlet. On February 27, 1964, the Chief of Engineers 
accepted the proposals, in part, and supplemental 
assurances were executed by State of New York on 
April 20, 1964, and accepted by District Engineer 
April 27, 1964, as follows; the State of New York now 
elects to proceed with authorized combined beach 
erosion control and hurricane protection project for 
South Shore of Long Island; that Superintendent of 
Public Works hereby reaffirms his assurance of August 
14, 1963, relative to complete project; that State of 
New York, as cooperating agency, will now agree that 
artificial fills will be added when and to extent found 
necessary by the Chief of Engineers, but not earlier 
than 3 years after completion of groins unless both the 
State of New York and the Chief of Engineers mutually 
agree to an earlier placement; that the superintendant 
agrees for State of New York to contribute the full 
amount of any increase in Federal costs resulting from 
the separate construction of the groins and subsequent 
fill; and that the State agree that construction of the 
two groins in the Georgica Pond area will depend on a 
favorable finding, following a study by the Chief of 
Engineers. Study was completed July 31, 1964, 
recommending construction, and approved by the 
Chief of Engineers on September 22, 1964. By letter 
dated November 5, 1964, the New York State 
Department of Public Works confirmed that title to all 
properties and interests in properties necessary for 
constructing the 11 groins was fully vested in Suffolk 
County. By letter dated December 7, 1964, the 
Department stated that the county had obtained 
easements or fee title for the parcels necessary for 
constructing the two groins. New York State 
Department of Public Works furnished $844,600 and 
$830,330 required contributed funds October 30, 1964, 
and September 7, 1965, respectively, for construction of 
11 groins in Moriches-Shinnecock reach, and $439,900 
on January 22, 1965, for construction of 2 groins in 
Georgica Pond area of the Southampton-Beach 
Hampton reach. The completed 2 groins and 11 groins 
were accepted by the New York State Department of 
Public Works for maintenance on May 11, 1966 and 
April 10, 1967, respectively. 
On March 22, 1965, the Department recommended 
that planning priority be in the order; Southampton- 
Beach Hampton (drainage structures first); 
Shinnecock Inlet-Southampton; Beach Hampton- 
Montauk Point; and Fire Island Inlet-Moriches Inlet. 
Planning on the drainage structures was initiated but 
was suspended, based on meeting of October 28, 1965 
with the Georgica Pond Association and the 
Preservation Society of East End wherein concern was 
indicated regarding the effects of the proposed 
drainage structure on ecology, salinity, pond level and 
aesthetic values; based on meeting with Congressional 
representatives, State legislators, Federal agencies and 
local officials held on May 26, 1966; and based on 
resolution of the Suffolk County Board of Supervisors 
adopted June 13, 1966 requesting advancement of the 
planning of the Fire Island Inlet-Moriches Inlet reach 
(Fire Island National Seashore). On June 16, 1967, the 
New York State Department of Public Works 
requested that the following work be undertaken as 
immediate priority items; in Moriches-Shinnecock 
Reach, beach and dune fill at 11 groins site, 
construction of four groins west of the completed 11 
groins, beach and dune fill east of the 11 groins; in 
Southampton-Beach Hampton reach (at East 
Hampton), construction of two additional groins, and 
the outlet structure at Georgica Pond. On March 18, 
1968 the Suffolk County Board of Supervisors adopted 
a resolution supporting construction of 4 groins in 
Reach 2 (Moriches - Shinnecock) and 2 groins in 
Reach 4 (Southampton - Beach Hampton). On April 
22, 1968 the Board adopted a more inclusive resolution 
authorizing participation in beach erosion and 
hurricane protection for the Moriches-Shinnecock 
101

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
reach and in the Georgica Pond area of the 
Southampton-Beach Hampton reach. On December 
24, 1968, the Commissioner of the New York State 
Conservation Department executed the second 
supplement to the assurances of local cooperation, 
which were accepted by the District Engineer on 
January 24, 1969. These assurances reaffirmed the 
previous assurances of the Department of Public Works 
and contain provisions for the construction of four 
additional groins in an area extending 6,000 feet west 
from the most westerly groin in the existing elevengroin 
field in the Moriches Inlet to Shinnecock Inlet 
Reach, and for placement of beach and dune fill in this 
four groin area to the full design cross section as defined 
in the authorized project report, except for the portion 
of the dune between mean sea level elevation 16 feet 
and 20 feet, thus in this stage construction establishing 
the top of dune to an elevation of 16 feet m.s.l. with a 65 
foot width at that elevation and the top of berm to 14 
feet m.s.l. with a 100 foot width at that elevation. These 
assurances also require that the State will obtain and 
provide without cost to the United States all lands, 
easements, and rights-of-way, which will permit entry 
on the lands for the period of construction, and that the 
necessary rights will be obtained, as required, of lands, 
easements and rights-of-way, for maintenance and 
repair of the groins, dunes, and berms, and to insure the 
integrity of the completed structure. 
Operations and results during fiscal year. Coordination 
with State and local interests continued. Started design 
in Reach 2 for six groins and placement of dunes and 
beachfill extending westward about 9,000 feet from the 
present Westhampton Beach construction site. On the 
third contract (Westhampton Area) four groins were 
completed, and dune and beachfill were about 75 
percent complete. 93,162 tons of stone and 839,000 
cubic yards of sand were placed. 25,500 cubic yards of 
sand were excavated. Costs for new work were $145,507 
for engineering and design, and $1,976,274 for 
construction. 
Condition at end of fiscal year. Engineering and design 
began November 1962 and is about 55 percent 
complete. Project construction commenced January 
18, 1965 and is about 7 percent complete. Two groins 
in Reach 4; Southampton-Beach Hampton, Section 3, 
were initiated in March, and completed in September 
1965, at a total cost of $592,418 of which $439,000 were 
incurred against required contributed funds. Eleven 
groins in Reach 2; Moriches-Shinnecock, Section 2, 
were initiated in January 1965, and completed in 
October 1966 at a total cost of $2,854,565 of which $1, 
370,191 were incurred against required contributed 
funds. Initial beach fill placement for 750,000 cubic 
yards in Reach 2, Section 1A was completed on May 
23, 1969. On August 4, 1969 work started on 4 groins 
and sandfill in Reach 2, Section 1. Completion of 
engineering and design, and construction of the 
remainder of the project remain. 
34. HERKIMER, MOHAWK RIVER, N.Y. 
Location. Mohawk River rises in west-central New 
York and flows generally southeasterly to Hudson 
River at Waterford and Cohoes, N.Y. It is 155 miles 
long and has a drainage area of 3,462 square miles. 
Village of Herkimer, N.Y., is on left bank to Mohawk 
River, 86 miles above its mouth, at the point at which 
West Canada Creek enters the Mohawk. (Map 
references; Geological Survey, Herkimer quadrangle; 
Army Map Service, series V821, sheet 6070 111 S.W.) 
Existing project. Protection for village of Herkimer 
provides for a blanket levee along railroad spur parallel 
to West Canada Creek for 1,535 feet, with two closure 
levees for 650 and 830 feet, respectively; levees along 
Mohawk River for 4,530 feet, with a gravel blanket 
along New York State Thruway embankment for 1,100 
feet; a levee on left bank of Bellinger Brook for 2,310 
feet; a sluice gate structure at intersection of levee and 
existing hydraulic canal, and interior drainage 
facilities including a pumping station. Estimated 
Federal cost for new work is $1,299,000 (July 1970), 
exclusive of land and other work to be provided by 
local interests at an estimated cost of $196,000. Existing 
project was authorized by 1958 Flood Control Act. (See 
H. Doc. 172, 85th Cong., 1st sess., which contains latest 
published map.) 
Local cooperation. Local interests must provide lands 
and rights-of-way for construction; perform all 
necessary reconstruction or alteration of highway 
bridges and street and utility changes; hold the United 
States free from damages; and maintain and operate 
completed works. Responsible agency is State of New 
York. On November 15, 1956, Department of Public 
Works, State of New York indicated general 
concurrence with project plan. General assurances of 
local cooperation were executed by the State in 
December 1961. In May 1962, assurances were 
received from the State that all lands, easements and 
rights-of-entry for construction of project have been 
obtained. New York State Conservation Department, 
July 15, 1968 letter requested that work on hydraulic 
canal be made part of Federal contract for West 
Canada Creek. New York State forwarded $45,000 on 
February 7, 1969. 
Operations and results during fiscal year. Plans for non- 
Federal portion were completed and coordinated with 
State. Cost for non-Federal items was $44,997. 
Condition at end offiscalyear. Construction by the Corps 
of existing project was commenced June 1962, and 
completed in April 1964. New York State Department 
of Public Works accepted the project for operation and 
maintenance on September 30, 1964. Plans for non- 
Federal portion were completed and coordinated with 
State. 
102

NEW YORK, N.Y., DISTRICT 
35. NORTH ELLENVILLE, N.Y. 
Location. In Ellenville, N.Y., on Beer Kill and 
Fantine Kill, at their confluence with Sandburg Creek, 
which discharges into Rondout Creek at Napanoch, 
N.Y., about 2 miles downstream from Ellenville. (See 
Geological Survey, Ellenville quadrangle; and Army 
Map Service, Ellenville quadrangle.) 
Existing project. Improvement includes constructing 
10,821 feet of levees (9,078 feet along Beer Kill and 1, 
743 feet along Fantine Kill) and 2,761 feet of fl-,; walls 
(1,946 feet along Beer Kill and 815 feet along F r'ntine 
Kill); capping 440 feet of retaining walls on Beer Kill; 
removing concrete dam improving 985 feet of channel, 
and constructing a 1,144 foot stream diversion on 
Fantine Kill; providing interior drainage including 2, 
800 feet of diversion ditches, 4 drainage structures, 2 
ponding areas; altering or replacing 6 bridges; and 
relocating 15 structures and miscellaneous utilities. 
Existing project known also as "Beer Kill and Fantine 
Kill at Ellenville, N.Y." is one of three physically and 
functionally independent projects included in Rondout 
Creek and Wallkill River, N.Y. and N.J., project which 
was authorized by Flood Control Act of 1962 (S. Doc. 
113, 87th Cong., 2d sess., contains latest published 
map). Estimated Federal cost for new work is $3,100, 
000 (July 1970), exclusive of lands, relocations, and 
other work to be provided by local interests at an 
estimated cost of $740,000. 
Local cooperation. Local interests must furnish lands 
and rights-of-way for construction; alter highways, 
highway bridges, utility and related facilities; hold the 
United States free from damages; protect channels, 
ponding areas and other flood works from future 
encroachment or obstruction that would reduce their 
flood carrying capacity and control development of 
fringe areas not protected by proposed improvement 
with a view to preventing an undue increase in flood 
damage potential; and maintain and operate 
completed works. State of New York is responsible for 
local cooperation. The Commissioner, New York State 
Conservation Department executed assurances of local 
cooperation on March 5, 1968, which were accepted by 
the District Engineer for the United States on March 
25, 1968. A supplemental assurance was signed by the 
State of New York on March 30, 1970 and accepted by 
the District Engineer on April 10, 1970. 
Operations and results during fiscal year. Approval was 
granted by the Secretary of the Army on May 21, 1969 
for the acceptance of other contributed funds for 
incorporation into the Federal contract of the raising of 
Cape Ave Bridge, an item of local cooperation. New 
York State sent $84,200 on March 24, 1970. 
Acquisition by local interests, of lands, easements and 
rights-of-way continued. Non-federal design 
completed. Revised Design Memorandum, which was 
submitted April 7, 1970 and approved May 18, 1970. 
Plans and specifications were updated to include 
reviews requested by State. Planning suspended in 
January 1970 because of Bureau of budget fund 
restrictions. Costs for new work were $23,744 federal 
for engineering and design, and $7,536 for non-federal 
items of planning. 
Condition at end of fiscal year. Preconstruction planning 
(advance engineering and design) was initiated in 
November 1964 and completed September 1967. 
Minor revisions to plans involving an upstream closure 
were completed February 14, 1969. Design 
memorandum and plans and specifications were 
revised and updated. Completion of acquisition of 
lands by the State, and construction of the project 
remain. 
36. RAHWAY, N.J. 
Location. In city of Rahway, on Rahway River, 5.1 
miles upstream of confluence of the river with Arthur 
Kill which separates New Jersey from Staten Island, 
N.Y. (See Army Map Service quadrangles Perth 
Amboy and Roselle.) 
Existing project. Improvement includes about 3,600 
linear feet of earth levees and 500 linear feet of concrete 
walls along west bank of river and along several streets; 
stop log structures; int rior drainage facilities and two 
pump stations. About 59,000 cubic yards of excavation 
and 83,000 cubic yards of fill are involved. Project was 
authorized by the Chief of Engineers June 12, 1964, 
pursuant to section 205, Public Law 858, 80th 
Congress, as amended. Estimated Federal cost for 
completed new work is $973,142 (July 1970), exclusive 
of lands, easements, and rights-of-way, utility 
relocations, road alterations and land fill, provided by 
local interests at an estimated cost of $243,000, of 
which $21,000 were other contributed costs for design 
by the government of certain local cooperation items. 
Local cooperation. Local interests must provide lands 
and rights-of-way, including spoil areas within the city, 
for construction; hold the United States free from 
damages; maintain completed works; construct land 
fill behind levee; provide for relocation of utilities; 
raising roads and manholes and construction of 
appurtenant sidewalks and curbs; protect the channel 
and flood control works from future encroachment or 
obstruction including waste disposal that would reduce 
their flood carrying capacity. Also agree to take 
appropriate measures to control development in fringe 
areas not protected by the improvement with a view to 
preventing an undue increase in the flood damage 
potential. Assurances of local cooperation adopted by 
Municipal Council of city of Rahway, N.J., July 8, 
1964, were accepted by District Engineer on 
September 10, 1964. On September 17, 1964, Mayor of 
Rahway furnished $21,000 other contributed funds to 
finance costs of design of non-Federal items of 
construction requested by local interests to be designed 
by the government. 
Operations and results during fiscal year. There were no 
costs for new work. Further improvements in the area, 
103

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
requested by local interests are being studied 
separately, see project; "Rahway, South Branch, N.J." 
Condition at end of fiscal year. Construction began 
September 2, 1965, completed August 31, 1966, and 
accepted by the City of Rahway for operation and 
maintenance on June 5, 1967. Project report on the 
feasibility of a separate flood control project generally 
between East Hazelwood Avenue and Mill Street, and 
a supplement dealing with possible extension of the 
existing improvements were completed on September 
18, 1967; see project; "Rahway, South Branch, N.J." 
Closing of project accounts remain. 
37. RAHWAY, SOUTH BRANCH, N.J. 
Location. In city of Rahway, at the junction of South 
Branch of the Rahway River with the Rahway River, 
in Union County, New Jersey, 4.6 miles upstream of 
confluence of the river with Arthur Kill which 
separates New Jersey from Staten Island, N.Y. (See 
Army Map Service quadrangles Perth Amboy and 
Roselle). 
Existing project. Improvement includes realignment 
and reshaping of existing channel for 1900 feet 
extending upstream from Hazelwood Avenue (about 
300 from stream junction); compacted fill on east 
bank; 1180 feet of levee, 60 feet of wall, and compacted 
fill on the west bank; replace Mill Street Bridge; 
interior drainage including pump station and ditches. 
Project was authorized by the Chief of Engineers 
January 6, 1969, pursuant to section 205, Public Law 
858, 80th Congress, as amended, subject to the 
adoption of a Department of Housing and Urban 
Development project. Estimated Federal cost for new 
work is $429,000 (July 1970), exclusive of lands, 
easements, and rights-of-way, utility relocations, road 
alterations and land fill, and new bridge to be provided 
by local interests at an estimated cost of $328,000. 
Local cooperation. Local interests must provide without 
cost to the United States all lands, easements, and 
rights of way including spoil areas, within the City, 
necessary for construction; hold and save the United 
States free from damages; maintain completed works; 
provide without cost to the United States for the 
relocation of utilities, buildings, raising of roads and 
manholes, construction of the Mill Street bridge and 
construction of appurtenant sidewalks and curbs; 
protect the channel and flood control works from 
encroachment or obstruction including waste disposal 
that would reduce their flood carrying capacity. Also, 
agree to take appropriate measures to control 
development in fringe areas not protected by the 
improvement with a view to preventing an undue 
increase in the flood damage potential; to pay all 
Federal costs in excess of $1,000,000; at least annually 
notify interests affected that the improvements will not 
provide complete protection from floods greater than 
the design condition. Assurances of local cooperation 
were executed by the Mayor, City of Rahway, N.J., 
April 24, 1969, were accepted by the District Engineer 
on June 5, 1969. On July 29, 1969 city of Rahway 
furnished $27,500 (contributed "other") for nonfederal 
design costs. 
Operation and results during fiscal year. The Philadelphia 
District completed plans and specifications for the 
Federal and non-federal portions. Planning costs; 
Federal, $43,762; non-federal, $27,443. 
Condition at end of fiscal year. Project report on the 
feasibility of a separate flood control project generally 
between East Hazelwood Avenue and Mill Street, and 
a supplement dealing with possible extension of the 
existing improvement at the project "Rahway, N.J." 
were completed on September 18, 1967, and financed 
under aforementioned project. Engineering was 
initiated January 9, 1969. Plans and specifications are 
being reviewed by New York District. Construction has 
not started. 
38. RARITAN BAY AND SANDY HOOK 
BAY, N.J. 
Location. Area included under this project comprises 
about 21 miles of coast in Middlesex and Monmouth 
Counties, N.J., and is about 30 miles southwest of New 
York City. It extends along Raritan and Sandy Hook 
Bays between entrances to Raritan River on the west 
and Shrewsbury River on the east. Sandy Hook, N.J., a 
low-lying peninsula on the east, separates Atlantic 
Ocean from Sandy Hook Bay. (See Coast and Geodetic 
Survey Charts 70, 286, 369, 375,824, 1000, 1108, 1215; 
and Geological Survey quadrangles of South Amboy, 
Keyport and Sandy Hook.) 
Existing project. Federal participation in constructing 
levees, beach fill, interior drainage facilities and groins 
to serve dual purposes of beach erosion control and 
hurricane protection. For Madison Township section, 
combined shore and hurricane protection 
improvement provides for; about 1.7 miles of beach fill 
at elevations of 5.5, 10, and 15 feet above mean sea 
level; about 0.4 mile of tieback levees at 15 feet above 
mean sea level; and interior drainage facilities. Shore 
protection improvement is provided for Matawan 
Township and Borough of Union Beach sections, 
including about 0.9 mile of beach fill at elevations of 
5.5 and 10 feet above mean sea level for Matawan, and 
about 0.6 mile of beach fill at 5.5 feet above mean sea 
level for Union Beach. In the Borough of Keansburg, 
East Keansburg, and West Keansburg, hurricane 
protection is provided, including about 2.7 miles of 
beach fill and 2.3 miles of tieback levees at an elevation 
of 15 feet above mean sea level; interior drainage 
structures; and three groins in Keansburg for shore 
protection. Design studies of the Keansburg-East 
Keansburg section include modification of the closure 
by relocating the previously proposed Way Cake Creek 
levee to an alignment west of Thorne Creek in order to 
avoid poor foundation conditions. These design 
changes, which were incorporated into the project 
104

NEW YORK, N.Y., DISTRICT 
plans, provide protection to an additional area in West 
Keansburg. Authorization also provides local interests 
be reimbursed $57,000 as Federal share of costs 
incurred by them for accomplishing beach protection 
at Keansburg in 1957. Total estimated Federal cost is 
$7,790,000 (July 1970) which includes $57,000 
reimbursement to local interests. Total estimated non- 
Federal cost for all requirements of local cooperation is 
$4,210,000, including $3,673,000 cash contribution. 
Project cost estimate reflects the cost sharing provisions 
of 1962 River and Harbor Act, which modified Federal 
participation to extent of one-half of costs allocated to 
beach erosion control feature, in lieu of one-third 
previously authorized by Public Law 727, 79th 
Congress. These new provisions resulted in increase in 
Federal participation from about 64.8 percent to about 
66.4 percent of estimated project cost exclusive of 
reimbursable completed work at Keansburg. Existing 
project was authorized in 1962 Flood Control Act (H. 
Doc. 464, 87th Cong., 2d sess.). Latest published map is 
in project document. 
Local cooperation. Flood Control Act of 1962 requires 
local interests; (a) Provide lands and rights-of-way, 
including borrow areas, for construction; (b) alter and 
relocate buildings, streets, storm drain, utilities and 
other structures; (c) bear percentage of total first cost 
for each segment (as shown in table 1, page 3, H. Doc. 
464, 87th Cong., 2d sess.), to consist of items in (a) and 
(b) above and a cash contribution to be paid either in a 
lump sum before starting construction or in 
installments before starting pertinent items, in 
accordance with construction schedules as required by 
Chief of Engineers, final apportionment of cost to be 
made after actual costs and values are determined; (d) 
hold the United States free from damages; (e) maintain 
all works after completion; (f) maintain during 
economic life of project continued public ownership of 
non-Federal publicly owned shores and continued 
availability for public use of privately owned shore 
equivalent to that upon which recommended Federal 
participation is based; (g) control water pollution to 
extent necessary to safeguard health of bathers; (h) 
obtain approval of Chief of Engineers of detailed plans 
and specifications for work contemplated and 
arrangements for its prosecution before starting any 
work on recommended beach protection phase of 
project at Matawan Township and Borough of Union 
Beach or beach protection phase of project at Madison 
Township for which Federal participation is planned, 
if undertaken separately from recommended combined 
improvement; (i) construct, concurrently with 
recommended beach fill, suitable parking fields and 
bathhouses open to all on equal terms; and (j) at least 
annually inform interests affected that hurricane 
improvements will not provide substantial protection 
from bay surges higher in elevation than that of 
Hurricane Donna, September 12, 1960. Cost 
apportionment prescribed by (c) above was revised by 
1962 River and Harbor Act pertinent to beach erosion 
control benefits, resulting non-Federal share being 33.6 
percent of estimated project cost exclusive of $57,000 
Federal reimbursement. Agency responsible for local 
cooperation is State of New Jersey. Assurances 
executed by State of New Jersey were accepted for the 
United States by the District Engineer on April 11, 
1963. Supplemental assurances adding 
nondiscrimination clauses were executed by the 
Commissioner of the Department of Conservation and 
Economic Development of the State of New Jersey on 
June 7, 1968, and accepted by the District Engineer on 
June 19, 1968. On September 3, 1963, December 28, 
1966, May 28, 1968, July 29, 1969, and October 28, 
1969, State of New Jersey furnished $428,000, $15,975, 
$342,000, $236,000 and $940,000 respectively, the 
contributed funds to cover its required share of the 
estimated costs of Madison Township section, and the 
initial share of the estimated costs of the Keansburg, 
East and West Keansburg section. By resolution dated 
December 2, 1963, Matawan Township declined to 
participate in the project at the present time; State of 
New Jersey then requested construction of Matawan 
Township section be deferred for inclusion in a later 
contract. On February 17, 1965, notification was 
received that lands, easements, and rights-of-way for 
construction in Madison had been acquired by the 
township. On May 31, 1968. Notification was received 
'that rights-of-way for construction of the shore work at 
Keansburg, East and West Keansburg had been 
acquired by the Borough of Keansburg and the 
Township of Middletown. Acquisition for the closure 
work was completed in June 1970. 
Operations and results during fiscal year. Coordination 
was continued with the Central Railroad of New Jersey 
for proposed agreement for altering railroad facilities 
at Pews Creek and near Rose Lane. Plans and 
specifications were updated. Contract for groins and 
beachfill at Keansburg was completed December 23, 
1969 and accepted by the State February 5, 1970. 
Contract for levee and pump plant awarded June 19, 
1970. Costs for new work were $123,590 for engineering 
and design, and $2,182,517 for construction, financed 
with Federal and required contributed funds. 
Condition at end offiscalyear. Engineering and design of 
existing project commenced November 1962 and is 
about 91 percent complete. Design studies, and plans 
and specifications for the Madison section and for the 
Keansburg, East and West Keansburg section are 
complete; and for the tentatively deferred Matawan 
section, about 90 percent complete. Project 
construction is about 52 percent complete. Madison 
Township construction was completed October 27, 
1966 and accepted by the State of New Jersey for 
operation and maintenance on March 20, 1967. 
Construction of the shore work at Keansburg and East 
Keansburg was completed. Contract was awarded for 
Keansburg closures. Completion of engineering and 
design, and construction remain. 
105

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
39. ROSENDALE, N.Y. 
Location. In town of Rosendale, N.Y., on Rondout 
Creek just upstream of its confluence with Wallkill 
River, its largest tributary. Creek flows into Hudson 
River at Kingston, N.Y. (See Geological Survey 
quadrangle, Rosendale; and Army Map Service 
quadrangle, Rosendale). 
Previous project. For details of completed clearing and 
snagging project pursuant to section 208, 1954 Flood 
Control Act, see Annual Report for 1957. 
Existing project. Includes channel excavation to 
deepen and widen for 11,300 feet, starting 1,000 feet 
upstream of the New York State Thruway bridge and 
ending 450 feet upstream of James Street Bridge, with 
widening and deepening through the gorge at Lefevre 
Falls for about 500 feet; supplemented by about 2,750 
feet of levees along low banks on both banks, about 1, 
470 feet of concrete walls in vicinity of bridges, and 
interior drainage works consisting of ditches, gated 
culverts and outlets, ponding areas, and pumping 
station. Existing project is one of three physically and 
functionally independent projects included in Rondout 
Creek and Wallkill River, N.Y. and N.J., project which 
was authorized by Flood Control Act of 1962 (S. Doc. 
113, 87th Cong., 2d sess., contains latest published 
map). Estimated Federal cost of new work is $3,530,000 
(July 1970), exclusive of lands, relocations including 
road raising, and other work to be provided by local 
interests at an estimated cost of $295,000. 
Local cooperation. Local interests must furnish lands 
and rights-of-way for construction; alter highways, 
highway bridges, utility and related facilities; hold the 
United States free from damages; protect channels, 
ponding areas, and other flood works from future 
encroachment or obstruction that would reduce their 
flood carrying capacity and control development of 
fringe areas not protected by proposed improvement 
with a view to preventing an undue increase in flood 
damage potential; and maintain and operate 
completed works. Agency responsible for local 
cooperation is State of New York. Assurances were 
executed by New York State Department of Public 
Works on December 23, 1965, and accepted by District 
Engineer in December 1965. Supplementary 
assurances regarding the inclusion of non-Federal 
cooperation items into the Federal construction 
contract were executed by the State of New York on 
March 8, 1968 and accepted by the District Engineer 
for the United States on March 25, 1968. Contributions 
by the Village of Rosendale of $26,000 and $3,736 were 
received on March 5 and May 15, 1968 respectively. 
Contributions by the State of New York of $94,000, 
$24,112, $2,000 and $29,700 were received on 
February 23, May 10, 1968, October 17, 1969 and 
January 7, 1970 respectively. 
Operations and results during fiscal year. Construction of 
the entire project including certain local items 
incorporated into the Federal contract continued. 
Costs for new work were $212,284 for engineering and 
design, and supervision and administration, and $1, 
190,712 for construction, financed by federal and 
contributed funds. 
Condition at end of fiscal year. Advance engineering and 
design was initiated in January 1964 and completed 
May 18, 1966. Design of local cooperation items was 
completed in May 1968, with revisions in FY 1969 and 
FY 1970. Construction work by contract was initiated 
on June 24, 1968 and is 95 percent complete. 
40. SANDBURG CREEK, SPRING GLEN, 
N.Y. 
Location. At Spring Glen, N.Y., about 7 miles 
upstream of the mouth of Sandburg Creek near 
Naponock, N.Y. where it joins with Rondout Creek. 
Sandburg Creek rises in the Town of Wawarsing, flows 
in a southeasterly direction for about 12.7 miles to its 
junction with Homowack Kill just below Spring Glen, 
then continues for about 4.8 miles to discharge into 
Rondout Creek. (See U. S. Geological Survey 
quadrangle; Ellenville, N.Y.). 
Existing Project. Improvement includes channel 
excavation and clearing, 2,530 feet of levees, 2,325 feet 
of floodwalls, interior drainage facilities and land fill 
along Sandburg Creek, extending for a total distance of 
about 4,000 feet; and about 800 feet of levees and 
interior drainage facilities along Homowack Kill. 
Reconnaissance report was authorized April 3, 1962 
and completed February 14, 1963. Detailed project 
report was authorized August 6, 1963, completed 
December 21, 1964, and revised concerning the 
reconstruction of Old Route 209 bridge, by December 
23, 1966. Project was authorized for construction by 
Chief of Engineers March 16, 1967, pursuant to section 
205, Public Law 858, 80th Congress, as amended. 
Estimated Federal cost of new work is $716,000 (July 
1970), which includes $26,000 for preauthorization 
study reports, exclusive of lands, easements and rightsof-
way, utility relocations, road raising, and 
reconstruction of bridges, and other pertinent work, to 
be provided by local interests at an estimated cost of 
$158,000. 
Local cooperation. Local interests must give assurances 
they will provide all lands, easements and rights-ofway, 
including spoil areas necessary for construction; 
hold the United States free from damages; maintain 
completed works; provide for relocation of utilities, 
raising of roads and reconstruction of bridges; protect 
the channel and flood control works from future 
encroachment or obstruction, including waste disposal, 
that would reduce their flood carrying capacity. Also 
agree to take appropriate measures to control 
development in fringe areas not protected by the 
improvement with a view to preventing an undue 
increase in the flood damage potential. Provide a 
pumping station or additional gravity outlets, as 
appropriate, to compensate for any loss in ponding 
106

NEW YORK, N.Y., DISTRICT 
area effectiveness due to the modification of or 
encroachment upon such area. Agency responsible for 
local cooperation is the State of New York. In letter 
dated November 28, 1966, the New York State 
Department of Public Works stated that the State is 
prepared to participate in the project. Assurances of 
local cooperation were requested from the State 
January 10, and November 7, 1967, March 27, 
October 20, and October 31, 1969. By September 5, 
1969 letter, the State requested that planning be 
continued but construction not be scheduled for FY 
1970. 
Operations and results during fiscal year. Preparation of 
plans and specifications and local coordination 
continued. Costs for new work were $33,397 for 
planning. 
Condition at end of fiscal year. Preauthorization studies 
were completed. Design engineering was initiated in 
June 1967 and is about 60 percent complete. 
Construction has not been initiated. 
41. SOUTH ELLENVILLE, N.Y. 
Location. Project is in Ellenville, N.Y., on North Gully 
just above its confluence with Sandburg Creek, which 
discharges into Rondout Creek at Napanock, N.Y., 
about 2 miles downstream from Ellenville. (See U.S. 
Geological Survey, Ellenville quadrangle; Army Map 
Service, Ellenville quadrangle.) 
Existing project. Improvement includes; a 2,300 foot 
concrete chute, a crib dam to prevent debris from 
entering chute; 380 feet of walls and a stilling basin; 
823 feet of levees to protect against backwater from 
Sandburg Creek; a ponding area, drainage ditches and 
other interior drainage facilities. 
Existing project, also known as "North Gully at 
Ellenville, N.Y.", is one of three physically and 
functionally independent projects included in Rondout 
Creek and Wallkill River, N.Y. and N.J., project which 
was authorized by Flood Control Act of 1962. (See S. 
Doc. 113, 87th Cong., 2nd sess., which contains latest 
published map.) 
Estimated Federal cost for new work is $1,820,000 
(July 1970), exclusive of lands, relocations and other 
work to be provided by local interests at an estimated 
cost of $200,000. 
Local cooperation. Local interests must, prior to 
construction, give assurances they will furnish all lands, 
easements, and rights-of-way necessary for 
construction of improvements; perform all alteration of 
highways, highway bridges, utility and related facilities 
made necessary for construction of project; hold the 
United States free from damages; protect channels, 
ponding areas and other flood works from future 
encroachment or obstruction that would reduce their 
flood carrying capacity and control development of 
fringe areas not protected by proposed improvement 
with a view to preventing an undue increase in flood 
damage potential; and maintain and operate 
completed works. Agency responsible for local 
cooperation is State of New York. The Commissioner, 
New York State Department of Conservation executed 
assurances of local cooperation on March 5, 1968 
which were accepted by the District Engineer for the 
United States on March 25, 1968. 
Operations and results during fiscal year. Revised and 
resubmitted the Design Memorandum on February 19, 
1970, recommending model study. Costs for new work 
were $27,672 for planning. 
Condition at end of fiscal year. Preconstruction planning 
was started in January 1967. Design Memorandum 
was submitted and revised. Completion of engineering 
and design, and construction remain. Planning is about 
50% complete. 
42. SOUTH ORANGE, N.J. 
Location Village of South Orange, N.J., about 3.5 
miles upstream from junction of East and West 
Branches of Rahway River. It is in northeastern New 
Jersey and lies within metropolitan area of Greater 
New York. (See N.J. Department of Conservation and 
Economic Development quadrangles and Army Map 
Service quadrangle sheets for South Orange, N.J.) 
Existing project. Provides for clearing and excavation 
of the East Branch (7,217 feet); construction of 300 feet 
of floodwalls, 690 feet of levees, 3,324 feet of concrete 
flume; reconstruction of five bridges; raising roads; 
providing interior drainage work, and miscellaneous 
utility changes. Project was authorized by 1965 Flood 
Control Act (H. Doc. 67, 89th Cong., 1st sess., contains 
latest published map). Estimated Federal cost for new 
work is $3,210,000 (July 1970) exclusive of land and 
other work to be provided by local interests at an 
estimated cost of $970,000. 
Local cooperation. Local interests must provide lands 
and rights-of-way for construction; hold the United 
States free from damages; maintain and operate 
completed works; make necessary changes to highways, 
highway bridges and approaches, utilities, and 
miscellaneous existing improvements; protect channels 
and other flood control works from future 
encroachment or obstruction that would reduce their 
flood-carrying capacity; and control development of 
the fringe areas not protected by the proposed 
improvement with a view to preventing an undue 
increase in the flood damage potential. Signed 
assurances were received from the Village of South 
Orange on August 15, 1969 and accepted by the 
District Engineer on August 25, 1969. A signed 
supplemental assurance covering items of local work 
were received from the Village of South Orange on 
June 23, 1970. ENGCW-OC December 24, 1969, 2nd 
Indorsement to NANEN-Bd November 25, 1969 letter 
authorized acceptance of "Contributed Funds, Other." 
January 27, 1970 5th Indorsement authorized 
accepting $81,000 todo non-federal design. OnJune 1, 
107

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
1970, $40,000 were received from the Village for design 
of non-federal work. 
Operations and results during fiscal year. Local 
cooperation continued. The Design Memorandum was 
revised and resubmitted on February 20, 1970. Port 
authorization letter on significant changes submitted 
June 5, 1970. Costs for new work for advanced 
engineering and design were $5,172. 
Condition at end of fiscal year. Advance engineering and 
design was initiated in March 1967 and is 75 percent 
complete. Completion of engineering and design and 
construction remain. 
43. STATEN ISLAND, N.Y. 
Location. About 13 miles of coast along southern and 
eastern coast of Staten Island, a borough of New York 
City, from Ft. Wadsworth at the Narrows to 
Tottenville at the mouth of Arthur Kill along Lower 
New York and Raritan Bays. (See Coast and Geodetic 
Survey Charts & Geological Survey maps for New 
York and vicinity, Staten Island and Sandy Hook Bay 
area.) 
Existing project. Provides for combined shore and 
hurricane protection between Graham and Oakwood 
Beaches and at Tottenville Beach; shore protection at 
Great Kills Park and between Arbutus Lake and 
Sequine Point. Improvement includes 2.6 miles of 
beach fill and dunes at Tottenville Beach and between 
Graham and Oakwood Beaches; 2.2 miles of beach fill 
only at Great Kills Park and between Arbutus Lake 
and Sequine Point; 2.9 miles of levees at Tottenville 
Beach, Graham Beach and between Oakwood Beach 
and Great Kills Park; two groins at Tottenville Beach 
and Sequine Point; interior drainage facilities 
including four pumping stations between Graham and 
Oakwood Beaches; and relocations. Existing project 
was authorized by 1965 Flood Control Act. (H. Doc. 
181, 89th Cong., 1st sess., contains latest published 
map). Total estimated Federal cost is $12,170,000 (July 
1970) which includes participation in periodic beach 
nourishment for 10 years at $94,000 annually. Total 
estimated non-Federal cost for all requirements of local 
cooperation is $7,010,000, including $4,410,000 cash 
contribution, $1,200,000 for lands and $1,400,000 
estimated annual beach nourishment cost for a 10-year 
period, and excludes annual nourishment costs 
thereafter and annual maintenance and replacement 
costs. 
Local cooperation. Local interests must provide lands 
and rights-of-way for construction; alter and relocate 
buildings, streets, storm drains, utilities and other 
structures; bear 34 percent of total first cost, estimated 
$5,610,000 to consist of the two items listed above and a 
cash contribution now estimated at $4,410,000 which 
excludes $1,400,000 for 10 year nourishment, or, if any 
section is undertaken separately the apportionment of 
first cost will be as shown in District Engineer's report, 
with due regard to change in public ownership and 
other changes before construction, provided that cash 
contribution be paid either in a lump sum before 
starting entire project, or in installments before starting 
pertinent items, final apportionment of cost to be made 
after actual costs and values have been determined; 
hold the United States free from damages; maintain 
completed works and provide periodic nourishment 
during economic life of the shore protection works 
subject to Federal participation in cost of periodic 
nourishment for an initial period of 10 years, non- 
Federal share of such costs for the 10-year period is 
presently estimated at 31 percent for Graham Beach to 
Oakwood Beach reach, 33 percent for Tottenville 
Beach reach, 30 percent for Great Kills Park reach, 
and 62 percent for Arbitus Lake to Sequine Point 
reach; maintain during economic life of project 
continued public ownership and administration for 
public use of non-Federal publicly owned shores upon 
which recommended Federal participation is based; 
adopt appropriate ordinances to provide for 
preservation of dunes; and control water pollution to 
safeguard the health of bathers. If local interests elect to 
incorporate features in highway or other developments 
in the waterfront area which serve the purpose of 
hurricane protection, United States shall participate in 
cost of such features on a basis such that overall Federal 
cost for hurricane protection shall not be greater than 
that which would apply in the absence of such features, 
and such that any resultant savings in overall cost of 
combined features shall be shared equitably between 
the United States and local interests on the basis of cost 
allocation and cost apportionment approved by the 
Chief of Engineers, provided that such participation in 
the combined features shall be subject to the 
undertaking of any necessary remaining hurricane 
protection works by the United States. New York State 
Department of Public Works in letter dated December 
1965 stated it was prepared to execute assurances when 
plans are in final form. 
Operation and results during fiscal year. Advance 
engineering and design continued. Feasibility study on 
project extension from Graham Beach to Ft. 
Wadsworth was submitted September 30, 1969. Started 
action on revised scope to include the project extension. 
Feasibility study of project extension in this reach was 
completed. Costs for new work for advance engineering 
and design were $92,442, 
Condition at end offiscalyear. Preconstruction planning 
was initiated in January 1966 and is about 78 percent 
complete. Feasibility study of project extension to 
include Graham Beach to Fort Wadsworth was 
authorized November 16, 1967 and is complete. Design 
of revised scope is underway. Completion of 
engineering and design, and construction remain. 
108

NEW YORK, N.Y., DISTRICT 
44. WATERBURY RESERVOIR, WINOOSKI 
RIVER BASIN, VT. 
Location. The Winooski River rises in the 
northeastern part of Vermont and flows westerly about 
90 miles into Lake Champlain, about 4 miles north of 
Burlington, Vt. It lies wholly within the State and has a 
drainage area of about 1,080 square miles. The 
Waterbury Reservoir with a drainage area of 109 
square miles is located in the Waterbury River, which 
enters the Winooski River 42 miles above the mouth, 
about 2 miles below Waterbury, Vt. (See U.S. 
Geological Survey map covering Camels Hump, Vt., 
quadrangle.) 
Existing project. The existing dam is of rolled-earthfill 
type 1,800 feet long at its crest rising 155 feet above the 
streambed, and providing a total storage capacity of 
64,700 acre-feet, of which 27,900 acre-feet are reserved 
for flood control. This project provides for modification 
of the Waterbury Dam so as to accommodate safely the 
maximum probable flood. The work consists of 
increasing the height of the dam 3 feet to elevation 633 
feet mean sea level, the installation of one extra 35-foot 
tainter gate, thus providing a total of three gates and 
reducing the length of fixed crest spillway by 38 feet, 
the installation of a gasoline-engine generator for the 
emergency operation of the gates in case of power 
failure, riprapping new embankment, restoring road 
surface and guard rails, extending the existing bridge 
over the new tainter gate section, and performing such 
incidental work as may be required. Construction of 
the Waterbury Reservoir was completed in 1938 under 
authority granted by the Director, Emergency 
Conservation Work on June 2, 1933. The work was 
performed by the Civilian Conservation Corps under 
the supervision of the Chief of Engineers, United States 
Army. 
The Federal cost for new work, completed in 1960, is 
$860,569, exclusive of amount expended on previous 
project. 
The existing project was adopted by the Flood 
Control Act of December 22, 1944. (See H. Doc. 629, 
78th Cong., 2d sess.) The latest published map is in the 
project document. 
Local cooperation. The Flood Control Act of December 
22, 1944, authorized the project subject to the 
condition that the State of Vermont give assurance 
satisfactory to the Secretary of War that it will; 
(a) Provide, without cost to the United States, all 
lands, easements, and rights-of-way necessary for the 
construction. 
(b) Hold and save the United States free from claims 
for damages due to the construction works and due to 
inundation of the reservoir areas between the present 
and proposed maximum flow lines. 
(c) Continue to maintain and operate the works after 
completion in accordance with regulations prescribed 
by the Secretary of War. 
451-584 0-72-8 
In letter dated September 2, 1947, the Governor of 
the State of Vermont gave assurances that the State of 
Vermont would comply with all conditions of local 
cooperation. By letter dated September 14, 1956, the 
State of Vermont confirmed that all required lands, 
easements and rights-of-way necessasy for the 
construction were owned by the State. 
Operations and results during fiscal year. Completed 
preparation of the project regulation manual 
(maintenance cost $3,396). Received $15,000 to design 
recreational facilities. 
Condition at end of fiscal year. Construction of the 
existing project was commenced on October 19, 1956, 
was operationally completed in September 1958, and 
was physically completed and accepted by local 
interests on July 14, 1959. All project new work was 
completed February 27, 1961. Studies for scheduling of 
reservoir operations were underway in FY 1954, 1955, 
1956, 1968, and 1969. Project regulation manual 
completed. 
45. WRIGHTSVILLE RESERVOIR, 
WINOOSKI RIVER BASIN, VT. 
Location. Winooski River rises in northeastern part of 
Vermont and flows westerly about 90 miles into Lake 
Champlain, about 4 miles north of Burlington, Vt. It 
lies wholly within the State and has a drainage area of 
about 1,080 square miles. Wrightsville Reservoir with a 
drainage area of 68 square miles is on North Branch 
which enters Winooski River 56 miles above mouth at 
Montpelier, Vt. (See Geological Survey map covering 
Montpelier, Vt., quadrangle.) 
Existing project. Dam is rolled earthfill, 1,250 feet long 
with a maximum height of 95 feet, and provides a total 
storage capacity of 20,300 acre-feet, all of which is 
reserved for flood control. Project provides for 
modification of Wrightsville Dam to acccommodate 
safely the maximum probable flood. Work consists of 
raising dam 20 feet to elevation 715 feet mean sea level, 
thereby increasing the length about 275 feet, replacing 
existing spillway weir by a new concrete ogee spillway 
of larger section, replacing existing rockfill wall with a 
new concrete wall, widening existing rock spillway 
discharge channel, altering roadway, and performing 
such incidental work as may be required. Construction 
of Wrightsville Dam was completed in 1935 under 
authority granted by director, Emergency 
Conservation Work, on June 2, 1933. Work was 
performed by Civilian Conservation Corps under 
supervision of the Chief of Engineers. Federal cost for 
new work, completed in 1961, is $1,346,479, exclusive 
of amount expended on previous project. Estimated 
non-Federal cost of land and other work provided by 
local interests is $3,000. Existing project was adopted 
by 1944 Flood Control Act (H. Doc. 629, 78th Cong., 
2d sess., contains latest published map). Federal cost of 
new work for recreational facilities on completed 
project (code 711) is $203,450 (July 1970). This work 
09

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
includes; provide a recreational pool by modifying the 
intake; clear reservoir; construct boat launching ramp 
and picnic area, with parking areas and access roads. 
Under general authority granted by section 4, Flood 
Control Act of 1944, the Chief of Engineers approved 
construction of recreational facilities January 8, 1961. 
Local cooperation. Fully complied with for modification 
of the dam. (See Annual Report 1961.) Supplemental 
requirements regarding construction of recreational 
facilities; provides lands, easements and rights of way 
for construction; hold the United States free from 
damages; and continue to maintain and operate all 
works after completion. Local interests will provide 
picnic tables, fireplaces, drinking water and sanitary 
facilities, at an estimated non-Federal cost of $10,000. 
On July 25, 1962, the Commissioner of the Department 
of Water Resources, State of Vermont, advised that the 
State would provide necessary assurances. 
Supplemental assurances for recreation facilities were 
forwarded by the State of Vermont on July 24, 1964, 
and accepted by the District Engineer on July 29, 1964. 
Operation and results during fiscal year. Unused balance 
of $1,151 was revoked. 
Condition at end of fiscal year. Construction of existing 
project, excluding recreational facilities, was 
completed February 1961. Construction of intake 
works and log boom was operationally completed June 
25, 1965, and accepted by State of Vermont for 
operation and maintenance July 12, 1965. Reservoir 
clearing was started March 1965, operationally 
completed August 1966, and accepted by State-of 
Vermont for operation and maintenance August 8, 
1966. Construction of boat launching ramp and picnic 
area, with parking areas and access roads was started 
June 12, 1967 and completed November 27, 1967. All 
project construction is physically complete including 
Federal recreation facilities. Final payment on the 
contract for intake works and log boom, was made in 
August 1968. Unused balance was revoked in FY 1970. 
46. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspections of completed flood control works are 
performed periodically to determine the extent of 
compliance by local interests with the requirements of 
operation and maintenance. 
47. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 2-J at end of chapter.) 
48. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION Flood control 
activities pursuant to section 205, Public Law 858, 80th 
Congress as amended (preauthorization) 
Fiscal year costs for preauthorization studies were 
$21,690 for Ambrose Brook, N.J., $25,532 for Bonygutt 
Brook, N.J., $19,410 for Boundbrook, N.J., $10,751 for 
Chappaqua, Saw Mill River, N.Y., $7,000 for East Br., 
Rahway River Orange & West Orange, N.J., $16,794 
for Esopus Creek, Kingston, N.Y., $2,498 for Hirshfeld 
Brook, N.J., $4,067 for Nine Mile Creek, Holland 
Patent, N.Y., $2,227 for Poplar Brook, Deal and 
Ocean, N.J., $9,424 for Rahway River, Springfield at 
mile 17.5, N.J., $3,513 for Rahway River, Springfield 
at Fadem Industrial Park, N.J., $12,182 for Sawmill 
River, Elmsford, N.Y., $317 for Shakers Creek at 
Albany Airport, N.Y., and $4,355 for Schoharie Creek, 
Prattsville, N.Y. 
EMERGENCY FLOOD CONTROL 
ACTIVITIES - REPAIR, FLOOD FIGHTING, 
AND RESCUE WORK PUBLIC LAW 99, 84 TH 
CONG., AND ANTECEDENT LEGISLATION 
Under advance preparations for flood emergencies, 
three Supplements to ER 500-1-1 "Emergency 
Employment of Army Resources" were revised. One 
other, Supplement D "Radiological Recovery 
Activities" was revised and retitled "National 
Emergency Activities Plan" in accordance with ER 
500-2-1. National Emergency Activities Plans were 
also prepared for the Albany and Caven Point Field 
Offices. The District's plan for combatting major oil 
spills was incorporated as an Appendix to Supplement 
B of ER 500-1-1. The Emergency Operations Planner 
attended FWPCA meetings at Edison, N.J. and 
Governors Island, New York, and OEP-OCD meetings 
in New York, New Jersey and Maynard, 
Massachusetts. Final inspections and post flood report 
were completed for the "Major Disaster" flood of May 
1968 in seven northern New Jersey counties. Of the 72 
local emergency repair projects considered, 60 
qualified under Public Law 875. Final inspections were 
completed on the latter and the total reimbursement 
recommended to these communities by the Corps of 
Engineers amounted to $753,190. At the request of 
Governor Cahill of New Jersey, the District conducted, 
in May and June 1970, a survey of northern New 
Jersey problem areas where damages from future floods 
could be alleviated by a program of snagging and 
clearing affected secondary and tributary streams. Of 
the 178 communities investigated, 142 were found to 
have such problems. The District survey indicated that 
the cost of the work at these 142 localities would 
amount to an estimated $4,324,700. 
Under emergency rehabilitation, engineering for the 
proposed rehabilitation of the existing levee on West 
Canada Creek at Herkimer, N.Y., continued. Based on 
request by New York State and Village of IHerkimer, 
approval was granted on October 15, 1968 for 
incorporation of the non-Federal items of the 
completed authorized project "Herkimer, N.Y." into 
the proposed Federal construction contract for West 
Canada Creek. 
Fiscal year costs were $29,400 for advance 
preparation for flood emergencies, $53,961 for 
110

NEW YORK, N.Y., DISTRICT 
emergency operations (of which $791 were for the post 
flood report of May 28-29 1968, $21,438 for the beach 
replenishment at Gil go Beach, $5,657 for support to 
the Office of Emergency Preparedness in connection 
with the May 1968 storm and $26,075 for 
rehabilitation of levee in West Canada Creek at 
Herkimer, N.Y.) 
49. SURVEYS 
(See Table 2-K at end of chapter.) 
50. COLLECTION AND STUDY OF BASIC 
DATA 
Fiscal year costs of $200,627 for flood plain 
management services are set forth in Table 2-M at end 
of chapter. (See also Table 2-L on completed flood 
plain studies.) 
Fiscal year costs were $8,167 for civil works 
investigations in the research and development 
category for the Study of Public and Institutional 
Attitudes and Perception by the North Atlantic 
Division office. Fiscal year costs were $12,506 for Flood 
Insurance studies in Oakland, Elizabeth, Dover and 
Pequannock, N.J., and Saltaire, N.Y. 
111

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 2-A 
See 
Section 
in Text Project 
1. Aquatic Plant 
Control 
2. Bay Ridge & Red 
Hook Channels, N.Y. 
3. Buttermilk Channel, 
N.Y. 
4. , East Chester Creek, 
N.Y. 
5. East Rockaway 
Inlet, N.Y. 
6. Fire Island Inlet, 
N.Y. 
7. Great Lakes to 
Hudson River 
Waterway, N.Y. 
8. Hudson River, N.Y. 
9. Hudson River 
Channel, N.Y. 
10. Jones Inlet, N.Y. 
11. Lake Montauk 
Harbor, N.Y. 
(Regular Funds) 
COST AND FINANCIAL STATEMENT 
Total to 
FY-67 FY-68 FY-69 FY-70 June 30,1970 
$ 14,000 
3,712 
$ 30,000 $ 22,000 
7,471 9,596 
- - 
- 489,806 
489,806 
Funding 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
861 
861 
2,622 
2,622 
96 
96 
1,797 
1,797 
302,751 
302,751 
1,199 
1,199 
14,868 
9,588 
406,500 
101,099 
3,200,000 
3,086,256 
-112,413 
651,468 
730,406 
565,000 
525,988 
345 
345 
200,000 
20,947 
73,176 
84,708 
100,000 
88,772 
1,685,000 
631,158 
763,345 
343,105 
1,191,600 
1,186,469 
408 
408 
391,680 
526,580 
112 
$ 16,000 $ 82,0001 
16,017 36,7962 
- 5,523,2973 
- 5,523,297 
662,525 7,165,318 
662,489 7,165,282 
- 4,590,2014 
- 4,590,2014 
290,153 2,614,109 
275,700 2,599,657 
- 592,0565 ,6 
- 592,0565,6 
20,242 476,5625 
19,801 476,121s 
- 503,9697 
- 503,969 7 
95,160 1,300,434 
95,438 1,300,343 
- 594,3558 
- 594,355 
224,913 1,944,412 
234,656 1,942,826 
- 33,899,4969 
288,925 33,111,3249 
- 44,158,29310,11 
- 44,158,29310,11 
531,616 14,886,81212'13 
829,113 14,726,60212,13 
- 6,771,87014 
- 6,771,87014 
867,063 13,310,133 
859,680 13,297,619 
- 1,822,5301s 
- 1,822,53015 
163,400 1,477,956 
151,112 1,465,668 
- 791,68016 
- 791,68016 
78,626 
72,007 
199,488 
505,007 
1,860,000 
1,974,145 
268,083 
342,166 
790,180 
861,062 
200,000 
244,153

TA RI 1 '_,A ( 'rntinarlM 
NEW YORK, N.Y., DISTRICT 
P('QT A MIf LIN A NIP A I QTA TFIMNIT 
1A AL.. L-5 CIJ1J~4J A) '-VI 1 LlUIZL t 1V t1\lAALs L I A 1 LkAL LI 1 
See 
Section Total to 
in Text Project 
(Required 
Contributed Funds) 
12. Larchmont Harbor, 
N.Y. 
13. Long Island 
Intracoastal 
Waterway, N.Y. 
14. Moriches Inlet, 
N.Y. 
15. Narrows of Lake 
Champlain, N.Y. & 
Vt. 
16. Newark Bay, 
Hackensack & 
Passaic Rivers, 
NJ. 
17. New York and New 
Jersey Channels 
18. New York Harbor- 
Collection and 
Removal of Drift 
19. New York Harbor- 
Entrance Channels 
and Anchorage 
Areas 
Funding 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. & Oper. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
FY-67 FY-68 FY-69 FY-70 June 30, 1970 
140 $ 1,421 
140 1,421 
- 15,000 
- - 
8,981 
8,981 
100,000 
25,659 
859 
859 
5,000 
3,397 
-22,433 
12,754 
1,000,000 
751,572 
624,487 
626,416 
1,340 
730,000 
581,553 
736,343 
680,974 
702 
702 
206,507 
206,507 
120,000 
131,341 
256,000 
248,440 
100,000 
47,054 
665,385 
13,261 
400,000 
294,952 
424,543 
490,076 
-4,227 
21,996 
652,187 
784,393 
997,813 
319,446 
100,000 
34,027 
318,178 
368,982 
$ 120,000 
6,080 
-5,818 
9,182 
258,000 
33,657 
33,239 
33,239 
136,000 
72,340 
268 
268 
23,797 
20,970 
700,000 
58,404 
908 
658,467 
-134,147 
499,819 
900,165 
886,344 
2,062,000 
1,358,426 
678,367 
700,000 
725,453 
343,195 
336,115 
$ 6,716 
120,636 
-8,473 
215,870 
175,367 
54,942 
112,827 
18,206 
25,071 
-540,000 
149,834 
60 
1,195 
1,591,073 
516,280 
909,203 
1,557,733 
360,000 
390,492 
352,239 
361,810 
$ 406,150 
406,150 
9,182 
9,182 
76,06517 
76,065'7 
265,451 
265,451 
235,964 
235,964 
1,293,065 
1,172,640 
356,000 
342,167 
1,467 
1,467 
681,81118 
681,81118 
678,88519,20 
668,66219,20 
11,755,56221,22 
11,750,85421,22 
8,083,737 
8,082,934 
73,075,3382,25,26 
73,075,297 24,25,26 
11,745,14427 
10,656,5302 
454,773 
454,773 
14,489,72228 
14,418,304 
997,81328 
997,81328 
20,244,79029 
20,234,762 
9,809,073 
9,806,688 
113

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 2-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY-67 FY-68 FY-69 FY-70 June 30, 1970 
20. Raritan River. N.J. New Work 
21. Shrewsbury River, 
NJ. 
22. Westchester Creek, 
N.Y. 
23. Supervisor of New 
York Harbor 
27. Staten Island 
Rapid Transit 
Railway Co. Bridge 
Across Arthur Kill, 
N.Y. 
28. Fire Island Inlet, 
L., N.Y. 
30. Bennington, Hoosic 
River Basin, Vt. 
31. East Rockaway Inlet 
to Rockaway Inlet 
& Jamaica Bay, N.Y. 
32. Elizabeth, NJ. 
33. Fire Island Inlet 
to Montauk Point, 
N.Y. (Regular 
Funds) 
(Required 
Contributed Funds) 
34. Herkimer, Mohawk 
River, N.Y. 
(Regular Funds) 
(Other Contributed 
Funds) 
35. North Ellenville, 
N.Y. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
345,000 
502,248 
100,000 
33,950 
2,007 
2,007 
-25,583 
235,541 
585,000 
557,597 
184,941 
112,875 
2,053 
2,053 
50,000 
6,123 
190,000 
45,263 
150,000 
147,648 
181,572 
567 
567 
219,778 
-4,976 
46 
150,000 
23,573 
5- 
105,841 
239,336 
100,000 
121,973 
27,488 
27,488 
725 
725 
571,000 
602,042 
-59,028 
165,000 
120,125 
350,000 
43,877 
110,000 
222,361 
280,000 
190,800 
422,668 
330,626 
45,362 
-35,000 
22,501 
$ 5-- 
161,480 
158,084 
97,000 
137,139 
10,849 
10,849 
1,122 
1,122 
535,000 
538,215 
50,488 
16,886 
290,000 
113,017 
250,000 
198,613 
850,000 
294,960 
305,000 3 9 
304,899 
45,000 
100,000 
30,108 
148,415 
140,135 
153,000 
109,896 
189,352 
159,907 
605,330 
600,476 
91,147 
64,973 
200,030 
-130,000 
22,825 
400,000 
1,086,481 
1,593,100 
1,035,302 
44,997 
-115,000 
23,744 
iwV " a- . vim' - -u . ..- Vv " W-.- _ 
114 
$ 1,551,47030,31 
1,551,47030,31 
6,225,51332 
6,217,23332 
1,137,4573334 
1,090,41633,34 
1,175,32435 
1,175,32435 
175,93336 
175,933 
1,144,77037 
1,115,325 
17,746,147 
17,738,009 
7,839,613 
7,779,611 
3,246,767 
3,144,311 
18,298 
18,298 
415,000 
146,859 
590,000 
380,671 
620,000 
619,653 
3,977,768 
3,556,914 
13,973 
13,973 
4,012,930 
3,092,071 
1,308,024 
1,301,275 
45,000 
44,997 
235,000 
234,908

NEW YORK, N.Y., DISTRICT 
TABLE 2-A (Continued) 
See 
Section 
in Text Project Funding 
36. Rahway, NJ. New Work 
(Regular Funds) Approp. 
Cost 
(Other Contributed New Work 
Funds) Approp. 
Cost 
37. Rahway, South New Work 
Branch, NJ. Approp. 
(Regular Funds) Cost 
(Other Contributed New Work 
Funds) Approp. 
Cost 
38. Raritan Bay & New Work 
Sandy Hook Bay, Approp. 
NJ. Cost 
(Regular Funds) 
Maint. 
Approp. 
Cost 
(Required New Work 
Contributed Funds) Contrib. 
Cost 
39. Rosendale, N.Y. New Work 
(Regular Funds) Approp. 
Cost 
(Other Contributed New Work 
Funds) Contrib. 
Cost 
40. Sandburg Creek, New Work 
Spring Glen, N.Y. Approp. 
Cost 
41. South Ellenville, New Work 
N.Y. Approp. 
Cost 
42. South Orange, NJ. New Work 
Approp. 
Cost 
43. Staten Island, New Work 
N.Y. Approp. 
Cost 
44. Waterbury New Work 
Reservoir, Winooski Approp. 
River Basin, Vt. Cost 
45. Wrightsville 
Reservoir, Vt. 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY-67 FY-68 FY-69 FY-70 June 30; 1970 
$ 34,000 $ - 
30,286 7,476 
370,000 -250,000 
62,477 23,922 
15,975 342,000 
34,469 258 
547,590 50,000 
23,096 50,090 
- 147,848 
45,000 
199 308 
90,000 50,000 
19,645 72,199 
50,000 60,000 
1,206 34,873 
150,000. 200,000 
116,278 130,901 
- 1,000 
- 51 
35,600 71,000 
14,825 122,742 
$ - $ - 
- - 
36,900 20,000 
10,635 43,762 
- 27,500 
- 27,443 
582,000 2,009,000 
1,161,246 1,646,560 
262 
262 
236,000 
584,091 
650,000 
1,295,822 
73,354 
532,000 
21,067 
110,000 
35,082 
39,050 
79,488 
1,000 
1,853 
10,081 
940,000 
659,547 
1,300,000 
1,319,241 
31,700 
83,132 
-499,000 
33,397 
27,672 
5,172 
92,442 
15,000 
3,300 
3,396 
-1,150 
$ 978,824 
973,142 
21,000 
21,000 
56,900 
54,397 
27,500 
27,443 
4,092,500 
3,716,256 
262 
262 
1,961,975 
1,673,881 
2,872,590 
2,870,140 
179,548 
156,486 
104,000 
80,972 
250,000 
154,598 
110,000 
80,301 
450,000 
436,530 
875,569 
860,569 
8,200 
8,200 
1,549,929 
1,549,929 
115

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
1. Of which $14,000 is for North Atlantic Division accounts. 
2. Of which $10,431 is for North Atlantic Division accounts. 
3. Includes $1,246,100 for new work for previous projects 
and $64,560 expended from public works funds. 
3. Includes $496,250 for new work for previous projects 
and $122,051 expended from public works funds. 
5. Costs for previous project only. 
6. Includes $183,507 for new work expended from emergency 
relief funds. Excludes $14,403 for new work expended 
from contributed funds for previous projects. 
7. Excludes $100,000 for new work expended from contributed 
funds and includes $82,600 for new work expended from 
public works funds. 
8. Excludes $90,190 for new work expended from contributed 
funds. 
9. Includes $4,813,400 for new work expended from 
emergency relief funds. 
10. Includes $5,112,594 for new work for previous project. 
11. Includes $238,350 for new work expended from public 
works funds and $311,461 emergency relief funds. Excludes 
$81,373 expended from contributed funds, other. 
12. Excludes $454,273 expended between August 18, 1915 
and June 30, 1935, for operation and care of lock and dam at 
Troy, N.Y., under permanent indefinite appropriation. Excludes 
$23,735 reimbursement for repairs to Troy Lock. 
13. Includes $346,797 for maintenance for previous project. 
14. Includes $69,629 for new work for previous projects and 
$668,820 expended from public works funds. 
15. Excludes $1,822,530 for new work expended from 
contributed funds. 
16. Excludes $82,738 for new work expended from Navy 
funds. 
17. Includes $5,000 for new work expended for previous 
projects. 
18. Includes $115,000 for new work for previous projects. 
19. Includes $19,140 for maintenance for previous project. 
20. Includes $31,166 for U.S. Lake Survey Revisory and 
Inshore Sounding Program. 
21. Includes $1,836,403 for new work for previous projects. 
22. Excludes $285,600 for new work expended from contributed 
funds. 
23. Includes $1,490,713 for maintenance for previous projects. 
24. Includes $12,809,975 for new work for previous projects, 
and $6,621 for new work for Lemon Creek, Staten Island, N.Y. 
25. Excludes $7,712 for new work expended from contributed 
funds and includes $22,861 incurred in FY 1963 to be 
transferred to construction of Staten Island Rapid Transit Bridge 
during FY 1971. 
26. Includes $807,000 for new work expended from public 
works funds and $2,023,308 for new work expended from 
emergency relief funds. 
27. Includes $1,160,380 for maintenance for previous project, 
and $1,621 for maintenance for Lemon Creek, Staten 
Island, N.Y. 
28. Includes $2,491,206 expended to date for construction 
of a land-based overfire air pit incinerator ($1,493 393 in 
maintenance funds and $997,813 in M&O funds.) 
29. Includes $116,530 applied to removing wrecks authorized 
by acts prior to adoption of existing project. 
30. Includes $673,155 for new work for previous projects. 
31. Excludes $292,685 for new work expended from Ordnance 
funds and $66,000 for new work expended from contributed 
funds. 
32. Includes $111,419 for maintenance for previous projects. 
33. Includes $220,894 for new work for previous projects. 
34. Excludes $36,311 for new work expended from contributed 
funds. 
35. Includes $286,606 for maintenance for previous projects. 
36. Includes $77,182 for new work for previous projects. 
37. Includes $66,000 for maintenance for previous projects. 
38. For pilot program to improve coastal storm warnings. 
39. Excludes additional $1,035,000 retained in suspense 
account pending disposition, but posted in FY 70 and included 
in FY 70 data shown. 
116 
TABLE 2-A (Continued) COST AND FINANCIAL STATEMENT

NEW YORK, N.Y., DISTRICT 
AUTHORIZING LEGISLATION 
Work Authorized 
BAY RIDGE AND RED HOOK CHANNELS, N.Y. (See Section 2 
of Text) 
Channel 40 feet deep and 1,200 feet wide. 
Dredging to obtain first a depth of 35 feet, subsequently 
increasing depth of 40 feet for full width. 
Widening of Bay Ridge Channel to 1,780 feet. 
BUTTERMILK CHANNEL, N.Y. (See Section 3 of Text) 
Channel 1,200 feet wide and not less than 30 feet deep. 
Channel 1,000 feet wide to depths of 40 and 35 feet. 
Dredging two cutoff areas to provide minimum clear channel 
width of 2,100 feet at widening with Anchorage and Red 
Hook Channels. 
EAST CHESTER CREEK, N.Y. (See Section 4 of Text) 
Channel 10 feet deep and 150 to 70 feet wide. 
EAST ROCKAWAY INLET, N.Y. (See Section 65 of Text) 
Channel 12 feet deep and 250 feet wide, and a jetty. H 
FIRE ISLAND INLET, N.Y. (See Section 6 of Text) 
Construction of jetty. R 
Channel 10 feet deep. H 
GREAT LAKES TO HUDSON RIVER WATERWAY, N.Y. (See Section 
7 of Text) 
Deepening between locks to 14 feet, increasing overhead 
clearances to 20 feet and widening at bends and elsewhere. 
Depth of 13 feet below normal pool level through all locks 
between Waterford and Oswego. 
Increase expenditure limitation to $28 million. 
Increase expenditure limitation amount required for 
completion, then estimated at $33 million. 
HUDSON RIVER, N.Y. (See Section 8 of Text) 
Channel 12 feet deep from Hudson to Waterford, remove State 
lock and dam at Troy and construct a new lock and dam.3 
Channel 27 feet deep from Hudson to Albany, N. Y. 
Channel 27 feet deep below Hudson. 
Operation and care of lock and dam at Troy were included 
in project July 1, 1935. 
Relocation of 12-foot channel between Troy and Waterford. 
H. Doc. 337, 54th Cong., 2d 
sess. (Annual Report 1899, 
p. 1177). 
Rivers and Harbors Committee 
Doc. 44t 71st Cong., 
2d sess. 
H. Doc. 122, 56th Cong., 2d 
sess. (Annual Report 1901, 
p. 1299). 
Rivers and Harbors Committee 
Doc. 55 74th Cong., 
1st sess. 
H. Doc. 483, 87th Cong., 
2d sess. 
H. Doc. 749, 80th Cong., 
2d sess. 
i. Doc. 19, 71st Cong., 
1st sess. 
ivers and Harbors Committee 
Doc. 33, 75th Cong., 1st 
sess. 
. Doc. 762, 80th Cong., 
2d sess. 
ivers and Harbors Committee 
Doc. 20, 73d Cong., 
2d sess. 
. Doc. 252, 79th Cong., 
2d sess. 
ublic Law 87-874, 87th Cong., 
H.R. No. 13273. 
'ublic Law 89-42, 89th Cong., 
H.R. No. 6755. 
R
S 
P
P
H. Doc. 719, 61st Cong., 
2d sess.1 
H. Doc. 350, 68th Cong., 
1st sess. 
H. Doc. 210, 70th Cong., 
1st sess. 
S. Doc. 155, 72d Cong., 
2d sess. 
117 
TABLE 2-B 
Acts 
Mar 3, 1899 
Mar 2, 1907 
July 3, 1930 
Documents 
June 13, 1902 
Aug. 30, 1935 
Oct. 23, 1962 
May 17, 1950 
July 3, 1930 
Aug. 26, 1937 
May 17, 1950 
May 28, 19352 
Aug. 30, 1935 
Mar. 2, 1945 
Oct. 23, 1962 
June 18, 1965 
June 25, 1910 
Mar. 3, 1925 
July 3, 1930 
4 
Aug. 30, 1935s

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 2-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Deepen channel between Albany and Waterford to 14 feet 
with no change in depths for harbors in front of 
Albany and Troy. 
Deepen channel between New York City and Albany to 32 feet 
and construct a turning basin and 2 anchorages. 
HUDSON RIVER CHANNEL, N.Y. (See Section 9 of Text) 
Channel 30 feet deep from Ellis Island to Newark St., 40 feet 
deep through shoal from Newark St. to Castle Point and 
channel 26 by 550 feet along Weehawken-Edgewater waterfront. 
Remove shoal east side of river between West 19th and 
West 32d Sts.; remove rock near Battery to 40 feet; remove 
obstruction near Spuyten Duyvil Creek. 
Additional dredging through shoal from Newark St. to 
Castle Point. 
Remove shoal between West 32d and West 61st Sts. to 40 
feet and widen 40-foot channel between the Battery and 
Canal St. to 2,000 feet. 
Channel 30 by 750 feet along Weehawken-Edgewater waterfront. 
Modification of conditions of local cooperation affecting 
channel along Weehawken-Edgewater waterfront. 
Channel 40 feet deep between pierhead lines from 20th St., 
Manhattan, to a point 1,300 feet below Newark St., 
Hoboken, thence 2,800 feet wide to deep water off Ellis 
Island. Channel 30 feet deep between 40-foot channel 
and channel along Jersey City waterfront. 
Widen 40-foot channel to full width of river from north 
line of 59th St. to south side of Little Basin, thence 
a channel of same depth to deep water off Ellis Island. 
Waiver all conditions of local cooperation affecting 
channel along Weehawken-Edgewater waterfront. 
Channel 45 and 48 feet deep and 2,000 feet wide. 
JONES INLET, N.Y. (See Section 10 of Text) 
Construction of jetty and channel 12 feet deep and 250 feet 
wide. 
LAKE MONTAUK HARBOR, N.Y. (See Section 11 of Text) 
Channel 12 feet deep and 150 feet wide, 10 foot boat basin; 
repair and extension of two jetties, and adoption of sport 
fishing facilities on top of jetties. 
LARCHMONT HARBOR, N.Y. (See Section 12 of Text) 
Breakwater and removal of Huron Rock. 
Removal of ledges adjoining Huron Rock to 14 feet. 
LONG ISLAND INTRACOASTAL WATERWAY, N.Y. (See Section 13 
of Text) 
Channel 6 feet deep and 100 feet wide. 
Mar. 4, 1915 
Aug. 8, 1917 
Mar. 3, 1925 
Jan 21, 1927 
July 3, 1930 
Aug. 30, 19356 
Aug. 30, 19356 
Aug 26, 1937 
Mar. 2, 1945 
Mar. 2, 1945 
Mar. 3, 1899 
Mar. 2, 1907 
Aug. 26, 1937 
July 14, 1960 
NARROWS OF LAKE CHAMPLAIN, N.Y. and Vt. (See Section 15 
of Text) 
Channel 12 feet deep and 150 feet wide. 
H. Doc. 572, 75th Cong., 
3d sess. 
F
F
I
I 
June 20, 1938 
Sept. 3, 1954 
Mar. 4, 1913 
118 
H. Doc. 228, 83d Cong., 
1st sess. 
I. Doc. 719, 62d Cong., 
2d sess. 
Annual Report 1914, pp. 
234-235. 
H. Doc. 1697, 64th Cong., 
2d sess. 
I. Doc. 313, 68th Cong., 
1st sess. 
H. Doc. 450, 70th Cong., 
2d sess. 
H. Doc. 309, 72d Cong., 
1st sess. 
Rivers and Harbors Committee 
Doc. 49, 72d Cong., 2d sess. 
Senate committee print, 75th 
Cong., 1st sess. 1 
H. Doc. 409, 77th Cong., 
1st sess. 
H. Doc. 369, 76th Cong., 
1st sess. 
Annual Report 1899, p. 12137 
H. Doc. 181, 75th Cong., 
1st sess. 
-I. Doc. 126, 86th Cong., 
1st sess. 
H. Doc. 1387, 62nd Cong., 
3d sess. 
MORICHES INLET, N.Y. (See Section 14 of Text) 
Channel 10 feet deep and 200 feet wide. 
Aug. 8, 1917 
I
I

TABLE 2-B (Continued) 
NEW YORK, N.Y., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
NEWARK BAY, HACKENSACK AND PASSAIC RIVERS, NJ. (See 
Section 16 of Text) 
Mar. 2, 1907 16-foot channel in Passaic River. 
Feb. 27, 1911 
July 25, 1912 
Jan. 21, 1927 
July 3, 1930 
Mar. 2, 1945 
Mar. 2, 1945 
Sept. 3, 1954 
Oct. 23, 1962 
Nov. 7, 1966 
H. Doc. 441, 59th Cong., 
2d sess. 
H. Doc. 441, 59th Cong., 
2d sess. 
H. Doc. 707, 62d Cong., 
2d sess. 
H. Doc. 284, 69th Cong., 
2d sess. 
H. Doc. 156, 71st Cong., 
2d sess. 1 
S. Doc. 250, 79th Cong., 
2d sess. 
H. Doc. 430, 76th Cong., 
1st sess. 
H. Doc. 252, 82d Cong., 
1st sess. 
H. Doc. 289, 88th Cong., 
2d sess. 
H. Doc. 494, 89th Cong., 
2d sess. 
NEW YORK AND NEW JERSEY CHANNELS (See Section 17 of Text) 
Anchorage off Perth Amboy to 35 feet. Rivers and Harbors Committee 
Doc. 17, 71st Cong., 2d 
sess. 
Channel 35 feet deep from lower bay to upper bay, except H. Doc 133, 74th Cong., 
between vicinity of Smith Creek and vicinity of Piles 1st sess. 
Creek to 30 feet with anchorages 38 feet deep at Sandy 
Hook and Perth Amboy. 
Channel 35 feet deep from vicinity of Smith Creek to vicinity H. Doc. 233, 81st Cong., 
of Piles Creek. 1st sess. 
Widen entrance to Kill Van Kull to 1,400 feet narrowing to H. Doc. 108, 89th Cong., 
a minimum width of 1,000 feet. 1st sess. 
NEW YORK HARBOR, COLLECTION AND REMOVAL OF DRIFT (See 
Section 18 of Text) 
Allotment from appropriations made for New York Harbor and 
its immediate tributaries may be used for collection 
and removal of drift in these waterways. 
Carrying on this work as a separate and distinct project. 
NEW YORK HARBOR-ENTRANCE CHANNELS AND ANCHORAGE AREAS (See 
Section 19 of Text) 
Main Ship-Bayside-Gedney to 30 feet for width of 1,000 feet Annual Reports 1887, p. 62 and 
(dimensions fixed by Secretary of War, Dec. 27, 1886, by 1888, p. 63 
authority of act of Aug. 5, 1886). 
Ambrose Channel (East Channel) to 40 feet. H. Doc. 159, 55th Cong., 3d 
sess. (Annual Report 1899, 
p. 1279). 
Maintenance of entrance channel under 1 head. 
119 
Widening 16-foot channel in Passaic River. 
20-foot channel in Passaic River.8 
10-foot channel in Passaic River. 
30-foot channel in Passaic River. 
35 and 37 feet in main channel of Newark Bay and branch 
channel to and inshore channel at Port Newark Terminal 
and remove portion of rock area at Bergen Point to same 
depths. 
Modification of local cooperation for 10-foot channel in 
Passaic River. 
34- and 32-foot channel in Hackensack River including 
approach channel in Newark Bay from branch channel at 
Port Newark Terminal and a 25-foot turning basin. 
35-foot channels at Port Elizabeth. 
Widening 35-foot channel in Newark Bay, provision of two 
maneuvering areas, widening entrance into Port Elizabeth 
and Port Newark branch channels, deepening and widening 
Newark Bay 32-foot channel, and provision of a turning 
basin at junction of Hackensack and Passaic Rivers; and 
deepening 12-foot channel in Hackensack River to 15 feet. 
Sept. 6, 19339 
Aug. 30, 1935 
May 28, 193510 
May 17, 1950 
Oct. 27, 1965 
Mar. 4, 1915 
Aug. 8, 1917 
July 3, 1930 
July 5, 1884 
Mar. 3, 1899 
June 25, 1910

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Acts Work Authorized 
Aug. 8, 1917 
Aug. 8, 1917 
Aug. 8, 1917 
July 3, 1930 
Anchorage Channel, extension of Ambrose Channel into Upper 
Bay. 
Removal of Craven Shoal. 
Channel between Staten Island and Hoffman and Swinburne 
Islands. 
Relocation of southerly section of Anchorage Channel. 
Documents 
H. Doc. 518, 63d Cong., 
2d sess. 
H. Doc. 557, 64th Cong., 
1st sess. 
H. Doc. 625, 64th Cong., 
1st sess. 
Rivers and Harbors Committee 
Doc. 18, 71st Cong., 
2d sess. 
H. Doc. 183, 73d Cong., 
2d sess. 
H. Doc. 133, 74th Cong., 
1st sess. 
Senate committee print, 75th 
Cong., 1st sess. 1 
S. Doc. 45, 84th Cong., 
1st sess. 
S. Doc. 17,89th Cong., 
1st sess. 
H. Doc. 1341, 62d Cong., 
3d sess. 
H. Doc. 127, 70th Cong., 
1st sess. 
H. Doc. 454, 70th Cong., 
2d sess. 
Rivers and Harbors Committee 
Doc. 31 71st Cong., 
2d sess. 
Rivers and Harbors Committee 
Doc. 74t 74th Cong., 
2d sess. 
Report on file in the Office, 
Chief of Engineers (report 
not printed). 
H. Doc. 455, 86th Cong., 
2d sess. 
H. Doc. 1296, 62d Cong., 
3d sess. 
H. Doc. 157, 71st Cong., 
2d sess. 
Rivers and Harbors Committee 
Doc. 31, 74th Cong., 
1st sess. 
H. Doc. 285, 81st Cong., 
1st sess. 
H. Doc. 274, 89th Cong., 
1st sess. 
Rivers and Harbors Committee 
Doc. 8, 67th Cong., 
2d sess. 
120 
TABLE 2-B (Continued) 
Aug. 30, 1935 Dredging south end of Red Hook Flats, Liberty Island 
Anchorage, and channel along New Jersey pierhead line. 
Aug. 30, 1935 Deepen Bayside-Gedney Channel to 35 feet for a width of 800 
feet. 
Aug. 26, 1937 Deepen Ambrose and Anchorage Channels to 45 feet for a width 
of 2,000 feet. 
July 3, 1958 Dredging South Channel. Elimination of portion of 
Bayside-Gedney Channel. 
Oct. 27, 1965 Deepen and expand Red Hook Flats Anchorage. Deepen 
Gnavesend Bay Anchorage. 
RARITAN RIVER, N.J. (See Section 20 of Text) 
Mar. 2, 1919 Channel 15 feet deep and 200 feet wide to Washington 
Canal, thence 10 feet deep and 150 feet wide to canal 
locks and 10 feet deep through south channel.11 
July 3, 1930 Channel 25 feet deep and 300 feet wide up to New York and 
Long Branch R.R. bridge. 
July 3, 1930 Channel 10 feet deep in earth and 11 feet in rock to New 
Brunswick. Width reduced to 100 feet. 
July 3, 1930 Relocation of lower reach of south channel. 
Aug 26, 1937 Channel 25 feet deep and 300 feet wide to junction of main 
and south channels, thence of same depth on south channel 
to Titanium Pigment Co. 
Oct. 17, 1940 Channel 25 feet deep and 300 feet wide from junction of 
main and south channels to Government wharf, including 
a turning basin. 
Oct. 23, 1962 In south channel, maintenance of 15-foot channel to dock 
of Middlesex County Sewerage Authority. 
SHREWSBURY RIVER, N.J. (See Section 21 of Text) 
Mar. 2, 1919 Channel 6 feet deep in North Branch. 
Aug. 30, 1935 Channel 12 feet deep. 
Aug. 30, 1935 Channel 9 feet deep. 
May 17, 1950 Turning basin and anchorage 6 feet deep at Red Bank, and 
channels 6 feet deep in Claypit, Oceanport, and Little 
Silver Creeks. 
Oct. 27, 1965 Ocean channel 15 feet deep, 200 feet wide protected by 
two parallel jetties and bulkheads; bay channel 9 feet 
deep, 200 feet wide; 6-lane fixed highway bridge spanning 
new inlet. 
WESTCHESTER CREEK, N.Y. (See Section 22 of Text) 
Sept. 22, 1922 Channel 12 feet deep and two turning basins.

TABLE 2-B (Continued) 
NEW YORK, N.Y., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Sept. 3, 1954 Turning basin 250 by 250 feet in extent, 12 feet deep. H. Doc. 92, 82nd Cong., 
1st sess. 1 
1. Contains latest published maps. 8. Portion from 3,000 feet above Lincoln Highway Bridge to 
2. Emergency Relief Act of 1935. Jackson Street Bridge complete. From Jackson Street Bridge to 
3. Widening to form harbors at Albany and Troy to 12 feet Nairn Linoleum Works considered inactive. 
deep considered inactive. 9. Public Works Administration. 
4. Permanent Appropriations Repeal Act of June 26, 1934. 10. Emergency Relief Act of 1935. 
5. Public Works Administration, Sept. 6, 1933. 11. Upper 1,300 feet of South Channel, 10 feet deep and 150 
6. Also Public Works Administration Sept. 6, 1933, and feet wide considered inactive. 
April 27, 1935. 
7. For latest published map, see Doc. 697, 76th Cong., 3d 
sess. 
GREAT LAKES TO HUDSON RIVER WATERWAY, N. Y. 
TABLE 2-C. COSTS REPORTED FOR PARTIAL REIMBURSEMENT TO STATE OF NEW YORK 
(See Section 7 of Text) 
Work Federal Cost this Cost 
Contract Item of Work Commenced Work Fiscal to 
Completed Year Date 
FARC-64-39-Bridge E-8 Raising Bridge May 1964 Dec. 1967 $ - $ 96,801 
UA-1189-Bridge E-17 Raising Bridge Oct. 1964 April 1966 - 924,176 
FAC-65-18-Bridge E-44 Raising Bridge Sept. 1965 Dec. 1967 - 195,420 
UA-1199-Bridge E-50 Raising Bridge Oct. 1964 April 1966 - 519,500 
Bridge E-65 Raising Bridge May 1967 Nov. 1967 4,918 374,078 
Bridge 0-13 Raising Bridge Mar. 1967 May 1968 - 693,747 
FAC-6618-Bridge 0-14 Raising Bridge Sept. 1966 Dec. 1968 4,335 4,335 
FASS-66-15-Bridge E-34 Raising Bridge Nov. 1966 Nov. 1968 255,620 255,620 
M-65-2 Oswego Bank Protection Sept. 1965 Nov. 1967 5,185 5,185 
M-65-11 Erie Bank Protection Sept. 1962 Dec. 1963 - 931,063 
HUDSON RIVER, N. Y. 
TABLE 2-D. FEATURES OF LOCK AND DAM INCLUDED IN EXISTING PROJECT 
(See Section 8 of Text) 
Location: 
Below Waterford 2.2 miles 
Above Battery, New York City 153.8 miles 
Locks:
Clear Width 44.44 feet 
Greatest length available for full width 492.5 feet 
Lift at lowest stages 17.3 feet 
Depth on miter sills: 
Upper (at normal pool level) 16.3 feet 
Lower (at lowest low water) 13.0 feet 
Character of foundation: Rock. 
Kind o dam: Fixed. 
Type of construction: Concrete. 
Completed: 1917. 
Cost: $1,463,014. 
121

TABLE 2-E. 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TOTAL COSTS FOR EXISTING PROJECT TO JUNE 30, 1970 
See Rehabili- Mainte- Operation 
Section Project Funds New Work tation ancand Total 
in Text Care 
8. Hudson River, N. Y. Regular $38,495,888 - $8,156,071 $6,224,735 $52,876,694 
Public Works 238,350 - - 238,350 
Emergency Relief 311,461 - - - 311,461 
Total $39,045,699 - $8,156,071 $6,224,735 $53,426,505 
17. New York and New Regular $57,435,014 $454,773 $9,496,149 - $67,385,936 
Jersey Channels Public Works 807,000 - - - 807,000 
Emergency Relief 2,023,308 - - - 2,023,308 
Contributed 7,712 - - - 7,712 
Total $60,273,034 $454,773 $9,496,149 - $70,223,956 
SUPERVISOR OF NEW YORK HARBOR 
TABLE 2-F. STATEMENT OF ACTIVITIES 
(See Section 23 of Text) 
Activities FY 1970 
Number of Inspections: 
Shore Patrol 7,857 
Vessel Patrol 16,122 
Total Inspection 23,979 
Number of Cases: 
Oil and Chemical Pollution 379 
Debris 100 
Interference with Navigation 9 
Permit Violations 18 
Total Cases 506 
Supplemental Investigations 127 
Total Investigations 633 
Disposition of Cases: 
Violations Corrected 106 
Unfounded Complaints and Unknown Violators 156 
Forwarded to U. S. Attorneys for Legal Proceedings 139 
Pending - Corrective Action in Progress 105 
Total Cases 506 
Number of Warning Letters Issued: 129 
Total Amount of Fines Collected: $75,350 
Total Amount of Funds Expended by Violators to Correct Violations: $ 1,231,000 
Number of Dumping Permits Issued on a Quarterly Basis: 413 
Total Amount (Cubic Yards) of Material Deposited in Designated Dumping 
Areas Under the Supervision of the Supervisor of New York Harbor: 15,405,416 
122

NEW YORK, N.Y., DISTRICT 
RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 24 of Text) 
Project 
NEW JERSEY: 
Cheesequake Creek 
Raritan River 
Raritan River to Arthur Kill Cut-Off Channel 
Sandy Hook Bay at Leonardo 
Woodbridge Creek 
NEW YORK: 
Bronx River 
Browns Creek 
Coney Island Channel 
East River 
Fire Island Inlet 
Flushing Bay and Creek 
Glen Cove Creek 
Gowanus Creek 
Great South Bay 
Harlem River 
Hempstead Harbor 
Huntington Harbor 
Jamaica Bay 
Lake Montauk Harbor 
Larchmont Harbor 
Long Island Intercoastal Waterway 
Mamaroneck Harbor 
Newtown Creek 
New York and New Jersey Channels 
New York Harbor 
Plattsburgh Harbor 
Port Chester Harbor 
Port Jefferson Harbor 
Wallabout Channel 
Westchester Creek 
April 1970 
April 1970 
June 1970 
September 1969 
September 1969 
March - April 1970 
November 1969 - March 1970 
July 1969 
October - December 1969 
July 1969 -June 1970 
July 1969 -June 1970 
May 1970 
August - September 1969 
VERMONT: 
Burlington Harbor 
Channel between North and South Hero Island 
(Lake Champlain) 
Narrows of Lake Champlain 
1. Items for which no date is furnished reflects costs for gathering data only. 
123 
TABLE 2-G. 
Date Survey 
Conducted

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OTHER AUTHORIZED NAVIGATION PROJECTS 
Amt. Included 
For Last Total to 30June 1970 Fiscal Year inConstruction 
Full Report Operation and 1970 Costs 
Name of Project Full Report Construction OperFunds for New 
See Annual Maintenance Incurred Work for Pre- 
Report for for Surveys vius Projects 
Bronx River, N. Y. (Active)1, 5 
Browns Creek, N. Y. (Active)
1 2' 5 
Burlington Harbor, Vt.l 
Channel between North and South Hero 
Island, Lake Champlain, Vt. 2 
Cheesequake Creek, N.J. (Active)' 2, 5 
Coney Island Channel, N. Y.1 
Coney Island Creek, N. Y. (Active)", 5 
East River, N. Y.1 
Echo Bay Harbor, N. Y.1 
Elizabeth River, N.J. (Inactive)2 ' 3 
Flushing Bay and Creek, N. Y.1 
Glen Cove Creek, N. Y. (Active)l' 
5 
Glen Cove Harbor, N. Y. (Active) 
1' 5 
Gordons Landing, Lake Champlain, Vt.1' 2 
Gowanus Creek Channel, N. Y. 1 
Great Chazy River, N. Y.1 ' 2 
Great Kills Harbor, N. Y.1 ' 2 
Great South Bay, N. Y. 1 
Greenport Harbor, N. Y. 1 
Harlem River, N. Y.1 
Hempstead Harbor, N. Y. 
Huntington Harbor, N. Y. (Active)1, 
5 
Irvington Harbor, N. Y. (Inactive) 3 
Jamaica Bay, N. Y.1 
Keyport Harbor, N. J. 1 
Lemon Creek, N. Y. (Inactive)2 3 
Little Neck Bay, N. Y. 1 
Mamaroneck Harbor, N. Y. 1 
Manhasset Bay, N. Y. (Inactive)3 
Matawan Creek, N.J. (Active)2, 5 
Mattituck Harbor, N. Y." 
Milton Harbor, N. Y.1 
New Rochelle Harbor, N. y. 1, 2 
Newtown Creek, N. Y. (Active)1, 5 
Northport Harbor, N. Y. 
1 
Orowoc Creek, N. Y. (Inactive)3 
Otter Creek, Vt. (Active) 1' 2 
Peconic River, N. Y.1 
Peekskill Harbor, N. Y.1 
Plattsburgh Harbor, N. Y. 1' 2 
Portchester Harbor, N. Y. (Active) 1, 5 
Port Henry Harbor, N. Y. 1 
1966 
1963 
1966 
1909 
1953 
1954 
1952 
1966 
1953 
1953 
1968 
1966 
1966 
1892 
1954 
1895 
1962 
1968 
1953 
1969 
1969 
1953 
1948 
1964 
1968 
1937 
1969 
1967 
1948 
1968 
1966 
1968 
1949 
1964 
1956 
1949 
1967 
1953 
1951 
1953 
1967 
1931 
$ 1,149,9466 
33,9768 
706,4149 
31,000 
40,000 
111,371 
69,489 
30,091,145 
64,584 
60,4814 
2,102,90512 
29,76014 
72,00015 
34,750 
346,831 
18,000 
137,30116 
266,857 
74,681 
3,616,119 
39,468 
71,53518 
4,545,753 
40,475 
6,62120 
1,741,21021 
339,72022 
21,000 
177,925 
151,3732 
73,214 
1,168,354 
78,64427 
60,254 
25,000 
19,400 
198,415 
433,470 
69,40629 
$ 771,5317 
120,988 
283,556 
455 
28,596 
227,008 
6,111 
1,447,51310 
10,43911 
59,3914 
219,35313 
91,416 
2,455 
115 
80,698 
83,277 
553,807 
21,331 
458,084 
76,39717 
59,253 
1,188 
231,48719 
214,148 
1,621 
445 
300,669 
4,544 
164,806 
300,779 
26,061 
1,316,088 
1,441 
446 
19,060 
116,029 
59,946 
106,480 
443,59728 
1,253 
$ 7,120 
1,573 
343 
455 
$ 69,036 
21,000 
1,633 
3,123 
24,840 6,187,694 
- 47,368 
4,899 628,502 
351 
2,121 75,000 
3,479 40,000 
133 21,000 
1,203 21,869 
6,134 22,500 
1,043 79,332 
479 80,724 
- 43,175 
1,670 401,261 
1,270 
1,390 74,995 
124 
TABLE 2-H.

NEW YORK, N.Y., DISTRICT 
T 10A1 ! 'IIjXt ( /VT'IID AA T' DI7'7L TA A 1fl_ A IITT nu f slrCs'o 
1. Completed. 
2. No commerce reported. 
3. Awaiting local cooperation. 
4. Costs for previous projects only. 
5. A portion of this project is classified "inactive." 
6. Excludes $10,000 for new work expended from contributed 
funds. 
7. Includes $26,921 for maintenance for previous projects. 
8. Excludes $71,423 for rehabilitation. 
9. Includes costs of maintenance prior to July 1, 1886. 
Excludes $1,425,133 for rehabilitation. 
10. Includes $37,664 for maintenance for previous projects. 
11. Includes $10 for maintenance for previous projects. 
12. Excludes $419,879 for new work expended from contributed 
funds, and $580,425 contributed funds, other. Excludes 
$8,752 expended by the World's Fair Corp. for riprap protection of 
rubble dike. 
13. Includes $210,365 for maintenance for previous projects. 
14. Excludes $29,774 for new work expended from contributed 
funds. 
15. Excludes $94,366 for rehabilitation. 
16. Excludes $104,805 for new work expended from contributed 
funds. 
17. Includes $64,034 for maintenance for previous projects. 
18. Excludes $19,546 for new work expended from contributed 
funds and $31,454 to be contributed. 
19. Includes $2,961 for maintenance for previous projects. 
20. This amount also included in costs for New York and New 
Jersey channels. No work has been done on the existing project for 
Lemon Creek. 
451-584 0-72-9 
21. Excludes $1,741,210 for new work expended from contributed 
funds. 
22. Excludes $151,044 for new work expended from contributed 
funds. In addition, excludes $43,023 for new work and $5,502 
for maintenance, expended from contributed funds, other. 
23. Includes $13,415 for maintenance for previous projects. 
24. Excludes $34,580 for new work expended from contributed 
funds. 
25. Excludes $119,276 for new work expended from contributed 
funds. In addition, excludes $72,619 for new work expended 
from contributed funds, other. 
26. Includes $421,817 for maintenance for previous projects. 
27. Excludes $15,000 for new work expended from contributed 
funds. 
28. Includes $16,369 for maintenance for previous projects. 
29. Excludes $10,000 for new work expended from contributed 
funds. 
30. Expended from public work funds. 
31. Excludes $314,927 for rehabilitation. 
32. Includes $4,099 for maintenance for previous projects. 
33. Excludes $66,758 for rehabilitation. 
34. Excludes $53,790 for new work expended from contributed 
funds. 
35. Includes $15,000 for maintenance for previous projects. 
36. Excludes $77,247 for new work expended from contributed 
funds. 
37. Includes $169,709 for maintenance for previous projects. 
38. Excludes $365 for new work expended from contributed 
funds. 
39. Includes $84,934 for maintenance for previous projects. 
125 
I ABLL 2-l (Iontmue) uV InItR u invItuLu. s Ia v j�on iJ u rnjjJ c i L 
For Last Total to 30June 1970 Fiscal Year Amt. Included 
Full Report Operation and 1970 Costs 
Name of Project SFeuel l ARnenpuoratl Construction Maintenance Incurred FWunordks ffoorr PNreew- 
Report for for Surveys vious Projects 
Port Jefferson Harbor, N. Y. 1969 $ 171,4274 $ 20,6464 $ 6,782 $ - 
Rahway River, N. J. (To Be Restudied) 3 1949 37,0004 5734 - 
Rariton River to Arthur Kill Cut-Off Channel 1964 810,50030 1,711,626 4,216 
N.J. 1' 2 
Rondout Harbor, N. Y.1 1968 142,43731 244,08532 - 11,036 
Rouses Point, Lake Champlain, N. Y.1 1895 98,468 249 - 
Sag Harbor, N. Y.1 1964 121,80533 4,527 - 
St. Albans Harbor, Lake Champlain, Vt. ' 2 1917 3,125 385 - 
Sandy Hook Bay, N.J.1 1957 508,936 145,552 - 
Sandy Hook Bay at Leonardo, N. J. 1 ' 2 1967 56,470 88,581 152 - 
Saugerties Harbor, N. Y.1 ' 2 1968 81,905 169,13535 - 42,000 
Shark River, N. J. 1', 2 1958 150,000 272,311 - - 
Sheepshead Bay, N. Y.1 1948 33,828 4,627 - 26,000 
Shinnecock Inlet, N. Y. 1961 - 22 - - 
Shoal Harbor and Compton Creek, N. J. (Active) 1' 5 1968 124,57336 571,45237 - 17,000 
Sumpawanus (Babylon Creek) Inlet, N. .1 ',2 1895 7,000 13 - - 
Swanton Harbor, Vt. (Inactive)2 1888 70,500 129 - 
Tarrytown Harbor, N. Y.1 1966 69,836 224,207 - 
Ticonderoga River, N. Y. (Inactive)2 1895 16,500 - - 
Wallabout Channel, N. Y.1 1953 18,174 36,312 898 
Wappinger Creek, N. Y.1, 2 1950 13,000 43,376 - - 
Washington Canal and South River, N. J. 1 1953 206,11638 212,73539 - 157,224 
Waycake Creek, N.J.2, 3 1949 - 1,086 - - 
Woodbridge Creek, N.J. 1 1953 49,823 178,306 504 19,000

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 2-I OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
Cost to June 30, 1970 
For last full Operation 
report, see and 
Project Annual Report For Construction Maintenance 
Atlantic Coast of NJ., Sandy Hook to 1959 
Barnegat Inlet 
Perth Amboy, NJ. 1966 
TABLE 2-J OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Total to June 30, 1970 
For Last Full Operation 
Report, See Annual and 
Project Report For Construction Maintenance 
Adams, Hoosic River Basin, Mass.1 1964 6,282,3072 
Byram River at Pemberwick, Conn.1 '3 1959 363,515 
East Barre Reservoir, Winooski River, Vt.1 1963 2,832,084 
Hoosic Falls, Hoosic River Basin, N.Y. 1 1956 1,064,626 
Lamoille River, Vt.: 
Hardwick Dam4 '5 1939 - 
Johnson Gorge1 1939 49,8376 
Mississquoi River at Richford, Vt.1 '3 1965 221,476 
North Adams, Hoosic River Basin, Mass. 1968 15,409,3257 
Proctor, Otter Creek Basin, Vt.4 ' 5 1937 - 
Rome, Mohawk River, N.Y. 1959 - 
Rutland, Otter Creek, Vt. 1963 211,015 
South Amsterdam, Mohawk River, N. Y.1 1967 1,564,976 
Wappinger Creek at Pleasant Valley, N.Y.1 ,3 1959 142,075 
Waterbury, Winooski River Basin, Vt. 1951 - 
Waterford, Hudson and Mohawk Rivers, N.Y.4 1940 - 
Winooski River, Vt.1 1940 5,897,427 
Yonkers, N.Y. 1967 - 
1. Completed. 
2. Excludes costs of $913,360 under other contributed 
funds. 
3. Authorized by Chief of Engineers pursuant to sec. 205, 
Public Law 858, 80th Cong., as amended. 
4. Inactive. 
5. Not desired by local interests. 
6. Includes $23,507 emergency relief funds. 
7. Excludes costs of $2,718,624 under other contributed 
funds. 
126

NEW YORK, N.Y., DISTRICT 
SURVEYS 
(See Section 49 of Text) 
Study Class 
Navigation Studies 
Flood Control Studies 
Beach Erosion Studies1 
Special Studies 2 
Comprehensive Basin Studies (by North Atlantic Division Office) 
Total Surveys 
Fiscal Year 
Costs 
$ 153,998 
196,879 
61,851 
733,686 
515,798 
$1,662,212 
1. Excludes $1,482 of non-federal funds spent in East Rockaway Inlet - Norton Point. 
2. Includes $681,570 by North Atlantic Division. 
COMPLETED FLOOD PLAIN STUDIES 
TABLE 2-L (See Section 50 of Text) 
Date Federal 
Location Requesting Agency Completed Cost 
Esopus Creek, N. Y. New York State Department of July 1963 $ 99 
Public Works 
Branchburg Township, NJ. New Jersey State Department of Con- May 1969 26,000 
South Branch Raritan River servation and Economic Development 
Franklin and Clinton Townships, N.J. New Jersey State Department of Con- June 1969 24,712 
South Branch Raritan River servation and Economic Development 
North Branch Raritan and Lamington New Jersey State Department of Con- May 1969 43,732 
Rivers, NJ., Morris and Somerset servation and Economic Development 
Counties 
Raritan and Readington Townships, New Jersey State Department of Con- May 1969 28,254 
N. J., South Branch Raritan River servation and Economic Development 
Westchester County Streams, N. Y. Westchester County and New York State 
Beaver Swamp Brook Department of Public Works July 1965 5,400 
Blind Brook Jan. 1964 5,400 
Byram River July 1966 7,000 
Hutchinson River Aug. 1963 5,400 
Mamaroneck and Sheldrake Rivers Feb. 1967 6,000 
Saw Mill River Aug. 1963 5,400 
Wampus River July 1966 6,000 
Bedford, N. Y. Westchester County and New York State June 1970 24,465 
Stone Hill River Department of Public Works 
Highbridge and Califon Townships, NJ., New Jersey State Department of Con- March 1970 30,256 
South Branch Raritan River servation and Economic Development 
127 
TABLE 2-K

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 2-M COSTS FOR FLOOD PLAIN MANAGEMENT SERVICES 
(See Section 50 of Text) 
Studies and Services Fiscal Year 
Costs 
Barre, Vt., Stevens and Jail Branch $ 14,500 
Bedford, N. Y., Stone Hill River 536 
Branchburg, N. J., South Branch Raritan River 0 
Bronxville, N. Y., Bronx River 9,548 
Franklin and Clinton Townships, N. J., South Branch Raritan River 288 
Highbridge and Califon Townships, N. J., South Branch Raritan River 744 
Little Falls - Herkimer, N. Y., Mowhawk River 5,350 
Montpelier, Vt., Winooski River and North Branch 1,804 
Nassau County, N. Y., North and South Shore 17,935 
North Adams, Mass., Hoosic River 13,500 
North Branch Raritan and Lamington Rivers, N. J. 268 
Raritan Township, N. J., South Branch Raritan River 746 
St. Johnsville-Little Falls, N. Y., Mohawk River 26,135 
Williamstown, Mass., Hoosic River 4,640 
Flood Plain Technical Services 32,272 
Flood Plain Management Unit 47,033 
Flood Plain Management Unit - North Atlantic Division Office 22,000 
Comprehensive Flood Damage Prevention Planning 3,328 
Total $200,627 
128

PHILADELPHIA, PA., DISTRICT* 
This district comprises a portion of southeastern New 
York, eastern Pennsylvania, western and southern New 
Jersey, northern and southeastern Delaware, and a 
small part of northeastern Maryland embraced in the 
drainage basins tributary to the Atlantic Ocean from 
Manasquan River, N. J., inclusive, to south boundary 
of Delaware. It also includes Chesapeake and 
Delaware Canal and approach channel thereto in 
Chesapeake Bay and Elk River, Md. 
IMPROVEMENTS 
Navigation 
1. Absecon Inlet, N. J. ................................. 
2. Aquatic Plant Control ............................ 
3. Barnegat Inlet, N. J ................................ 
4. Cohansey River, N. J ............................. 
5. Delaware River Between Philadelphia, 
Pa., & Trenton, N. J .......................... 
6. Delaware River, Pa., N. J., & Del., 
Philadelphia to the Sea ....... ........... 
7. Indian River Inlet and Bay, Del. .......... 
8. Inland Waterway, Rehoboth Bay to 
Delaware Bay, Del ........................ 
9. Inland Waterway from Chincoteague 
Bay, Va., to Delaware Bay, Del. ....... 
10. Inland Waterway from Delaware River 
to Chesapeake Bay, Del., and Md. ..... 
11. Manasquan River, N. J .......................... 
12. New Jersey Intracoastal Waterway ......... 
13. Schuylkill River, Pa ................................ 
14. Waterway from Indian River Inlet to 
Rehoboth Bay, Del .............................. 
15. Wilmington Harbor, Del ........................ 
16. Reconnaissance and Condition Surveys. 
17. Other Authorized Navigation Projects ... 
18. Navigation Work Under Special 
Authorization ....................................... 
Page 
129 
130 
130 
131 
19. 
20. 
21. 
131 
132 22. 
133 23. 
24. 
133 25. 
134 26. 
27. 
134 28. 
135 
136 29. 
136 30. 
137 
137 
31. 
138 
138 
32. 
138 33. 
Beach Erosion Control Page 
Atlantic City, N. J. ................. 138 
Other Authorized Beach Erosion 
Control Projects ..................................... 39 
Beach Erosion Control Work Under 
Special Authorization ............................ 139 
Flood Control 
Beltzville Lake, Pa .................................. 
Blue Marsh Lake, Pa .............................. 
Francis E. Walter Dam, Pa. ............... 
General Edgar Jadwin Dam and 
Reservoir, Pa ........................................ 
Prompton Lake, Pa ................................. 
Trexler Lake, Pa ..................................... 
Inspection of Completed Flood Control 
Projects ........................................... 
Other Authorized Flood Control Projects 
Flood Control Work Under Special 
Authorization ....................................... 
139 
139 
140 
140 
140 
141 
141 
141 
142 
Multiple-Purpose Projects Including Power 
Tocks Island Lake, Pa., N. J., and N.Y. 142 
General Investigations 
Surveys ........................................ 142 
Collection and Study of Basic Data ....... 142 
NAVIGATION 
1. ABSECON INLET, N. J. 
Location. On New Jersey coast about 65 miles north of 
Delaware breakwater, between Brigantine Beach on 
the north and Absecon Beach on the south. It forms 
entrance to harbor at Atlantic City, N. J. (See U.S. 
Coast and Geodetic Survey Charts 826 and 1217.) 
Previous project. For details see Annual Report for 
1936, page 319. 
Existing project. This provides for an inlet entrance 
channel 20 feet deep at mean low water and 400 feet 
wide, for an entrance channel 15 feet deep and 200 feet 
wide from the inlet channel into Clam Creek, and for a 
turning basin 15 feet deep within Clam Creek. The act 
authorizing the inlet entrance channel also provides 
that should the channel at any time have a deleterious 
effect on the Atlantic City Beach, work upon the 
improvement may cease; it being understood that the 
project is adopted on the basis that the interests of the 
beach in front of the city are superior to those of the 
inlet. The total length of the section included in the 
project is about 1.5 miles. The mean tidal range in the 
ocean is 4 feet and at the inlet gorge 3.6 feet. The 
extreme tidal range, due to ocean storms is about 11 
feet. 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
129

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
The cost for the completed project was $307,712. 
(See Table 3-B at end of chapter for Acts authorizing 
existing project.) 
Local cooperation. Fully complied with except that 
local interests are required to furnish suitable spoildisposal 
areas for maintenance when and as required 
for the dredging of the entrance channel into Clam 
Creek and the turning basin within Clam Creek. 
Terminal Facilities. See pages 239 and 240 of Annual 
Report for 1962. 
Operations and results during fiscal year. Maintenance, 
contract: Dredging Clam Creek Channel commenced 
July 21, 1969 and was completed July 26, 1969. 
Removed 14,138 cubic yards of material at a cost of 
$10,999. 
Maintenance, hired labor: U. S. Hopper Dredge 
Hyde, dredging in entrance channel, from March 1, 
1970 to March 28, 1970, removed 142,502 cubic yards 
of material at a cost of $131,701. 
Condition at end of fiscal year. Project was completed 
May 1957. Inlet channel was completed in 1938. 
Dredging entrance from inlet channel into Clam Creek 
was completed in 1957. 
Costs for existing project were $307,712 for new work 
and $4,174,326 for maintenance, a total of $4,482,038. 
2. AQUATIC PLANT CONTROL 
Location. Includes those waters within geographic 
limits of Philadelphia District excessively infested with 
sea lettuce, eel grass, Eurasian water milfoil, 
filamentous algae or other obnoxious aquatic plant 
growth. 
Existing Project. A comprehensive program to provide 
for control and progressive eradiction of sea lettuce, eel 
grass, Eurasian water milfoil, and filomentous algae 
and other obnoxious aquatic plant growths from the 
navigable waters, tributary streams, connecting 
channels and other allied waters in the Philadelphia 
District in the combined interest of navigation, flood 
control, drainage, agriculture, fish and wildlife 
conservation, public health and related purposes 
including continued study for the most effective and 
economic control measures in cooperation with other 
Federal and State agencies. Cost to the Federal 
Government is estimated at $257,000 (July 1968). Cost 
to local interest, $89,800 (July 1968). Project was 
authorized by River and Harbor Act of 1965, Section 
104 of Public Law 89-298, 89th Congress, 1st Session. 
Local Cooperation. Local interests shall agree to hold 
and save the United States free from claims that may 
occur from control operations and to participate to the 
extent of 30% of the cost of such operation. Cost for 
research and planning before construction shall be 
borne fully by the Federal Government. Planning has 
identified the problem areas and District Personnel 
have met or corresponded with Federal, State and local 
groups and individuals. The Department of Forests 
and Waters of the Commonwealth of Pennsylvania has 
signified its willingness to cooperate. Representatives of 
New Jersey State agencies have informally indicated 
that the required cost sharing could be accomplished 
and have signified they will assist in any way possible. 
They are also cognizant of the 70% - 30% cost-share 
provisions. 
Operations and results during year. Costs of $24,218 were 
incurred for review and revision of the General Design 
Memorandum, surveys of weed problem areas, and 
cooperation with other agencies and State officials of 
New Jersey and Pennsylvania. 
Condition at end of fiscal year. General Design 
Memorandum for the Commonwealth of Pennsylvania 
completed December 1969, and memorandum for the 
State of New Jersey submitted for approval April 1970. 
Planning with the States of New Jersey and 
Pennsylvania continuing. 
Costs for the existing project total $60,342. 
3. BARNEGAT INLET, N.J. 
Location. On east coast of New Jersey about 50 miles 
south of Sandy Hook, between Island Beach on the 
north and Long Beach on the south (See U.S. Coast 
and Geodetic Chart Nos. 825 and 1216). This inlet is 
main entrance to Barnegat Bay, largest of the bays on 
New Jersey coast which are separated from the ocean 
by narrow barrier beaches. 
Existing project. Provides for a channel 8 feet deep 
through inlet and 10 feet through outer bar, channel to 
be protected by two converging stone jetties extending 
to 12-foot contour in the ocean and spaced 1,000 feet 
apart at outer ends; a channel of suitable hydraulic 
characteristics extending in a northwesterly direction 
from gorge in inlet to Oyster Creek Channel just 
northwest of Sunset Shoal, thence via Oyster Creek 
Channel to deep water in the bay; and maintenance of 
a channel 8 feet deep and 200 feet wide to connect 
Barnegat City Harbor with main inlet channel. Total 
length of section included in project is about 4.5 miles. 
Plane of reference is mean low water. Mean tidal range 
at inlet gorge is 2.7 feet and in Barnegat Bay 0.5 feet. 
Extreme tidal range at inlet is from about 2 feet below 
mean low water to about 3 feet above mean high water. 
Cost for new work for completed project was $448, 
849 exclusive of $300,000 contributed by local interests. 
(See Table 3-B at end of chapter for Acts authorizing 
existing projects.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are four docks or terminals in 
inner harbor at Barnegat Light which furnish 
adequate facilities for present commerce of locality. 
Operations and results during fiscal year. Maintenance, 
contract: Dredging Oyster Creek commenced April 16, 
1970 and completed May 19, 1970. Removed 63,467 
cubic yards of material at a cost of $92,116. Costs 
preparatory to dredging miscellaneous shoals and 
construction of timbergroins were $13,334. 
Maintenance, hired labor: U. S. Hopper Dredge 
Merritt, dredging entrance channel from April 7, 1970, 
to May 9, 1970, removed 60,458 cubic yards of material 
at a cost of $36,830. Shoaling studies initiated in 
130

PHILADELPHIA, PA., DISTRICT 
February 1968 were still in progress at the end of the 
fiscal year. Cost of the studies amounted to $112,883. 
Condition at end of fiscal year. Project was completed in 
1940. (For details, see page 203, Annual Report for 
1964). 
Controlling depths of channel at mean low water 
were; In June 1970 from ocean to inlet gorge, 3.5 feet; 
thence to inner end of inlet channel, 6.1 feet 
(November 1968); thence through Oyster Creek 
Channel to Barnegat Bay, 6.8 feet (May 1970). 
Cost under existing project, excluding $300,000 
contributed funds expended for new work, were $448, 
849 for new work and $2,231,490 for maintenance, a 
total of $2,680,339. 
4. COHANSEY RIVER, N.J. 
Location. Rises in Salem County, N.J., flows southerly 
and southwesterly 27 miles through Cumberland 
County, and empties into Delaware Bay about 62 miles 
below Philadelphia, Pa. (See Coast and Geodetic 
Survey Chart 1218.) 
Previous projects. For details see page 1785, Annual 
Report for 1915, and page 348, Annual Report for 
1938. 
Existing project. A channel 12 feet deep, 100 feet wide 
from that depth in Delaware Bay through a neck of 
land at the mouth and within the river to the south side 
of Glass Street in Bridgeton, 19 miles above the mouth; 
thence a channel 8 feet deep, 100 feet wide to Broad 
Street; and thence 75 feet wide to Commerce Street 
Bridge, 19 V4 miles above the mouth; and a turning 
basin 12 feet deep and 800 feet long formed by 
widening the channel on the south side to a maximum 
width of 250 feet just below Glass Street. Section 
included in project is about 19 1/2 miles long. All depths 
refer to the plane of mean low water. Mean tidal range 
at mouth is 5.9 feet, and 6.2 feet at Bridgeton. Extreme 
tidal range is from about 2 feet below mean low water 
to about 3 feet above mean high water. Completed 
project cost $110,756 for new work, exclusive of 
amounts expended on previous projects. (See Table 3-B 
at end of chapter for Acts authorizing existing project.) 
Local cooperation. Complied with except local interests 
must furnish suitable spoil-disposal areas for required 
maintenance. 
Terminal facilities. Twenty wharves, of which 16 are at 
Bridgeton and 4 at Greenwich. Facilities considered 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance, 
hired labor: Costs were $72 for real estate activities. 
Condition at end of fiscal year. Existing project was 
completed in 1939. Controlling depths at mean low 
water were 13.4 feet (June 1966) from deep water in 
Delaware Bay to the mouth; thence 12.8 feet (June 
1966) to Glass Street in Bridgeton; thence 4.2 feet 
(June 1965) to Broad Street; thence 3 feet (Dec 1959) 
to Commerce Street. Costs for existing project were 
$110,756 for new work and $630,908 for maintenance, 
a total of $741,664. 
5. DELAWARE RIVER BETWEEN 
PHILADELPHIA, PA., AND TRENTON, 
N.J. 
Location. Rises in southeastern New York, flows 
generally southerly 367 miles, forming boundary line 
between New York and New Jersey on the east and 
Pennsylvania and Delaware on the west, and empties 
into Delaware Bay. (See U.S. Coast and Geodetic 
Survey Charts 1218, 280, 294, 295, and 296.) 
Previous projects. For details see page 1778 of Annual 
Report for 1915, page 311 of Annual Report for 1924, 
page 220 of Annual Report for 1934, and page 296, 
Annual Report for 1938. 
Existing project. A channel from Allegheny Avenue, 
Philadelphia, 23.5 miles to upstream end of Newbold 
Island, 40 feet deep and 400 feet wide, with suitable 
widening of bends, including relocation of channel at 
Delair Railroad bridge, and reconstruction of bridge, 
thence 5.5 miles to upper end of Trenton Marine 
Terminal, 35 feet deep and 300 feet wide, with a 
turning basin 800 feet wide and 1,700 feet long at the 
terminal; and maintenance of a channel 12 feet deep 
and 200 feet wide from upper end of 35-foot channel to 
Penn Central Railroad bridge at Trenton, dredged 
under a previous project. Project also provides for an 
auxiliary channel 20 feet deep and 200 feet wide east of 
Burlington Island, extending easterly from main 
channel to upper end of U.S. Pipe and Foundary Co.'s 
property at East Burlington, with a turning basin 450 
feet wide at upper end; for initial excavation, only, of a 
cross channel 8 feet deep and 200 feet wide through 
artificial island opposite Delanco, N.J., and for 
constructing such bank protection works as may be 
necessary. Section included in project is about 30 1/2 
miles long, excluding auxiliary channel east of 
Burlington Island, which is 1.4 miles long, and cross 
channel opposite Delanco. Lower end is about 55 miles 
above river mouth at Liston Point and about 105 miles 
above Harbor of Refuge at mouth of Delaware Bay. All 
depths refer to plane of mean low water. Mean tidal 
range at Trenton is 6.7 feet, an increase of 1.3 feet since 
completion of 25-foot channel in 1937. Freshets, which 
occur usually during February and March, attain a 
height of 9 to 20 feet above mean low water in vicinity 
of Trenton. Navigation is occasionally suspended 
during a portion of winter months due to ice. Total 
estimated cost for new work is $69,663,904 (July 1965), 
exclusive of amounts expended for previous projects; 
$15,000 contributed funds and dredging upper 
channel, Newbold Island to Trenton, estimated cost $7, 
507,900 (July 1962). (See Table 3-B at end of chapter 
for Acts authorizing existing project.) 
Local cooperation. Modification authorized by 1954 
River and Harbor Act provides local interests must 
provide suitable terminal facilities, furnish lands and 
rights-of-way for construction and future maintenance, 
and hold the United States free from damages. Local 
interests complied with requirements, except city of 
Trenton has not provided suitable terminal facilities. 
131

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Terminal facilities. There are 21 piers, wharves, and 
docks from Allegheny Avenue, Philadelphia, Pa., to 
Trenton, N.J. Facilities are considered adequate for 
existing commerce. (For details see Port Series No. 8 
(revised 1966) Corps of Engineers.) 
Operations and results during fiscal year. Maintenance, 
contract: Dredging miscellaneous shoals between 
Pennsylvania Turnpike Bridge to Newbold Island 
commenced July 9, 1969, and was completed 
September 13, 1969. Removed 650,448 cubic yards of 
material at a cost of $829,316. Maintenance, hired 
labor: costs of $92,829 were incurred for shoaling 
studies, removal of debris, operation of stream gaging, 
miscellaneous engineering, supervision and 
inspections. 
Condition at end of fiscal year. Existing project is 90 
percent complete. A 40-foot channel under the 1954 
modification from Allegheny Avenue to upper end of 
Newbold Island was completed April 1964. Work 
remaining is dredging from upper end of Newbold 
Island to Trenton Marine Terminal and widening 
turning basin at terminal which is in deferred category. 
(See Table 3-C at end of chapter for total costs for 
existing project to June 30, 1970.) Total deferred 
charges, undistributed for amortization of cost of 
disposal areas, are $47,323. No charges during this 
fiscal year. 
6. DELAWARE RIVER, PA., N.J., AND 
DEL., PHILADELPHIA TO THE SEA 
Location. See U.S. Coast and Geodetic Survey Charts 
1218, 394, 295, and 280. 
Previous projects. For details see page 1779 of Annual 
Report for 1915, and page 299, Annual Report for 
1938. 
Existing project. Provides for a channel from deep 
water in Delaware Bay to a point in the bay near Ship 
John Light, 40 feet deep and 1,000 feet wide; thence to 
Philadelphia Naval Base, 40 feet deep and 800 feet 
wide, with 1,200-foot width at Bulkhead Bar and 1, 
000-foot width at other bends; thence to Allegheny 
Avenue, Philadelphia, Pa., 40 feet deep and 500 feet 
wide through Horseshoe Bend and 40 feet deep and 400 
feet wide through Philadelphia Harbor, along west side 
of channel; and for anchorages at Reedy Point, 
Deepwater Point, Marcus Hook, and Mantua Creek, 
each 40 feet deep and 2,300 feet wide with respective 
lengths of 8,000, 5,200, 13,650, and 11,500 feet; 
anchorage at Gloucester 30 feet deep and about 3,500 
feet long. Project also provides for construction of dikes 
and training works for regulation and control of tidal 
flow; for maintenance of an area on north side of 
channel opposite Philadelphia Naval Base between 
Shipway 3 and Schuylkill River to 40 feet deep and a 
width of 150 feet on Mifflin Range and of 200 feet on 
West Horseshoe Range; and for maintenance of any 
areas dredged by local interests to 35 feet deep between 
channel and a line 100 feet channelward of pierhead 
line between Point House wharf and Philadelphia 
Naval Base, when in opinion of Chief of Engineers such 
areas are so located as to be of benefit to general 
navigation. Section included in project is about 96.5 
miles long. All depths refer to plane of mean low water. 
Mean tidal range at various points on the river and bay 
is as follows; Philadelphia, Pa., 6 feet; Chester, Pa., 5.7 
feet; New Castle, Del., 5.5 feet; Liston Point, Del., 5.8 
feet; and Lewes, Del., 4.1 feet. Under influence of 
heavy and long-continued winds extreme tidal range is 
about 14 feet. Normal maximum velocity of tidal 
currents in the dredged channel varies between 2 and 3 
1/2 miles per hour. Storm tides may increase maximum 
to as much as 4 1/2 miles per hour. Estimated cost for 
new work is $68,229,700 (July 1970) exclusive of 
amounts expended on previous projects. Channel to 37 
feet deep and 500 feet wide through Horseshoe Bend 
and 37 feet deep and 600 feet wide through 
Philadelphia Harbor along east side of channel and 
Port Richmond anchorage to 37 feet deep, except for 
that portion of channel which forms a part of 40 feet 
deep and 400 feet wide channel portion of project is to 
be restudied and excluded from foregoing cost estimate. 
Estimated cost (July 1960) of this portion is $2,951,000. 
(See Table 3-B at end of chapter for Acts authorizing 
existing project.) 
Local cooperation. Requirements under 1938 River and 
Harbor Act for maintaining channel and anchorage in 
Philadelphia Harbor annually by cities of Philadelphia 
and Camden were removed (see 1962 Annual Report 
for details). 
Terminal facilities. There are 217 piers, wharves, and 
docks between Allegheny Avenue, Philadelphia and 
the sea, 135 on waterfront of Philadelphia, Camden, 
and Gloucester, and 82 below Philadelphia. Facilities 
are considered adequate for existing commerce. (For 
further details see Port Series Nos. 7, revised 1967, and 
8, revised 1966 - Corps of Engineers). 
Operations and results during fiscal year. New work, hired 
labor: Costs were $2,236 for acquisition costs and 
miscellaneous engineering. 
Maintenance, hired labor: Dredging in 40-foot 
channel was in progress during fiscal year. U. S. 
Hopper Dredges Comber and Goethals removed 6,821, 
464 cubic yards of material at a cost of $3,332,752. 
Costs for removal of obstruction and debris were $62, 
004. Costs of $32,960 were incurred for removal of 
navigation structures. Removal of rock on Marcus 
Hook Range continued during fiscal year at a cost of 
$121,370. Costs for preparation and maintenance of 
disposal areas, moorings and pipelines were $148,683. 
Costs for study of disposal areas, $44,477. Costs of $452, 
387 were incurred for engineering, channel 
examinations, inspections and other miscellaneous 
items. Real estate activities were $17,748. Deferred 
charges for disposal areas were $120,525. 
Condition at end of fiscal year. Existing project, 
excluding work deferred for restudy, is about 66 
percent complete. The 40-foot channel from naval base 
to the sea was completed in 1942. Dredging Naval Base 
to Allegheny Avenue to 40 feet deep was completed in 
1962. Work remaining is to construct new anchorages 
132

PHILADELPHIA, PA., DISTRICT 
at Reedy Point and Deepwater Point, enlarge Marcus 
Hook and Mantua Creek anchorages, channel 
dredging from 35 to 37 feet deep over a width of 500 
feet through Horseshoe Bend and 600 feet through 
Philadelphia Harbor, and deepening Port Richmond 
Anchorage to 37 feet all of which have been deferred 
for restudy. (See Table 3-C at end of chapter for total 
costs for existing project to June 30, 1970.) Deferred 
charges, undistributed, for amortization of costs of 
disposal areas were $197,859 for this fiscal year. Total 
charges $2,358,189. 
7. INDIAN RIVER INLET AND BAY, DEL. 
Location. Indian River rises in Sussex County, Del., 
and flows easterly 13 miles into Indian River Bay 
which is a shallow lagoon 6 miles long and 2 miles wide 
on the Delaware Coast about midway between Cape 
Henlopen and the Maryland State line. The inlet is an 
opening through the barrier beach separating Indian 
River Bay and the Atlantic Ocean. (See U.S. Coast 
and Geodetic Survey Chart No. 1219). 
Previous projects. Adopted by River and Harbor Act of 
August 2, 1882. For further details, see page 744, 
Annual Report for 1888. 
Existing project. This provides for the fixation of the 
inlet by the construction of two parallel jetties of steelsheet 
pile and stone design extending to approximately 
the 14-foot depth curve in the ocean, and for dredging 
an entrance channel 15 feet deep and 200 feet wide, for 
a distance of 7,000 feet inshore from the jetties; thence 
a channel 9 feet deep, 100 feet wide in the bay, and 80 
feet wide in the river, to and including a turning basin 
9 feet deep, 175 feet wide, and 300 feet long at Old 
Landing; thence a channel 4 feet deep and 60 feet wide 
to the highway bridge at Millsboro. The project also 
provides that the interior channel dimensions may, in 
the discretion of the Chief of Engineers, be modified as 
may be found desirable to increase the hydraulic 
efficiency of the channel, without increasing the cost. 
The total length of the section included in the project is 
about 13 3/4 miles. All depths refer to the plane of mean 
low water. The mean tidal range in the ocean at the 
inlet is 3.8 feet, and at the highway bridge inside the 
inlet, 2.4 feet. The extreme tidal range at the highway 
bridge is about 6 feet. 
The cost for new work for the completed project was 
$511,210, exclusive of amounts expended on previous 
projects and exclusive of $210,000 contributed funds. 
(See Table 3-B at end of chapter for Acts authorizing 
existing project.) 
Local cooperation. Fully complied with except that 
local interests are required to furnish suitable areas for 
disposal of dredged material during maintenance as 
and when needed, and provide terminal facilities. 
Terminal facilities. There is a privately owned basin 
with berthing facilities for small boats located about 
three-fourths mile west of the highway bridge near the 
inlet and one-quarter mile north of the inlet channel, 
connected therewith by a channel 6 feet deep and 40 
feet wide; a U.S. Coast Guard wharf on the north side 
of the inlet channel in the same locality; and two 
wharves at Oak Orchard in Indian River Bay. The 
facilities are considered adequate for existing 
commerce. 
Operations and results during the fiscal year. Maintenance, 
contract: Costs preparatory to dredging in the channel 
were $6,967. 
Maintenance, hired labor; $297 for real estate 
activities and $7,240 for administrative work. 
Condition at end of fiscal year. Existing project was 
completed in 1951. For details see Annual Report for 
1963. Controlling depths at mean low water were 17.3 
feet (Mar 1969) from ocean through inlet to highway 
bridge; thence 7.3 feet (Mar 1969) to small boat 
landing near entrance (3/4 mile west of highway 
bridge); thence 3.4 feet (Jun 1967) to Old Landing; 
and thence 3.4 feet (Aug 1967) to Millsboro. Costs 
under existing project, excluding $210,000 contributed 
funds expended for new work, were $511,210 for new 
work, $839,254 for maintenance and $1,323,775 for 
major rehabilitation, a total of $2,674,239. 
8. INLAND WATERWAY, REHOBOTH 
BAY TO DELAWARE BAY, DEL. 
Location. A tidal canal in southeasterly part of Sussex 
County, Del. It extends 12 miles northward from 
Rehoboth Bay through high land west of town of 
Rehoboth to Gordon Lake; thence through marshes 
back of Cape Henlopen to Lewes River; thence down 
Lewes River to its junction with Broadkill River near 
its mouth. An entrance to the waterway from Delaware 
Bay is about 4 miles above Cape Henlopen. (See U.S. 
Coast and Geodetic Survey Charts 379, 1218, and 
1219.) 
Previous projects. A canal along a slightly different 
route formed a part of projected waterway from 
Chincoteague Bay, Va., to Delaware Bay, begun in 
1886 and abandoned in 1905. 
Existing project. This provides for an entrance channel 
near Lewes 10 feet deep and 200 feet wide protected by 
two parallel jetties 500 feet apart; thence a channel 10 
feet deep and 100 feet wide to South Street Bridge at 
Lewes, with a basin of the same depth 1,200 feet long 
and up to 375 feet in width at the latter point; thence a 
channel 6 feet deep and 50 feet wide (40 feet wide 
through Deep Cut near Rehoboth) to Rehoboth Bay; a 
channel 6 feet deep and 100 feet wide from the 
entrance to Broadkill River; two parallel rubble jetties 
725 feet long at the Rehoboth Bay entrance; and the 
construction of one highway bridge and one railroad 
bridge at Rehoboth. The total length of the section 
included in the project is about 12 miles. 
All depths refer to the plane of mean low water. The 
mean tidal range in the waterway opposite the 
Delaware Bay entrance is 4.1 feet, at Lewes 3.7 feet, 
and at Rehoboth 0.6 foot. The extreme tidal range is 
from 1 foot below mean low water to about 3 feet above 
mean high water. 
The cost for new work for the completed portion of 
the project was $561,514, exclusive of amounts 
expended on previous projects and $60,000 contributed 
funds. The extension of thejetties at the Delaware Bay 
133

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
entrance is considered to be inactive and is excluded 
from the foregoing cost. The cost of the portion was last 
revised in 1960 and was estimated to be $816,000. (See 
Table 3-B at end of chapter for Acts authorizing 
existing project.) 
Local cooperation. Complied with except local interests 
must furnish suitable terminal facilities and necessary 
spoil-disposal areas. 
Terminal facilities. See page 228, Annual Report for 
1962. 
Operation and results during fiscal year. Maintenance, 
contract: Dredging miscellaneous shoals in Roosevelt 
Inlet commenced July 1, 1969, and was completed 
August 5, 1969. Removed 39,483 cubic yards of 
material at a cost of $197,980. 
Maintenance, hired labor: $5,825 for real estate 
activities; $1,080 for stream gaging; and $7,698 for 
administrative work. 
Condition at end of fiscal year. Existing project is about 
70 percent complete. For details on completed work see 
page 241 of Annual Report for 1963. Work remaining, 
extension of existing jetties at Delaware Bay entrance, 
is considered inactive. Controlling depths at mean low 
water (August 1969) in entrance channel, 10.6 feet; 
and thence to highway bridge at Lewes, 7.8 feet; and 
thence to Rehoboth Bay, 2.0 feet (October 1968). 
9. INLAND WATERWAY FROM 
CHINCOTEAGUE BAY, VA., TO 
DELAWARE BAY, DEL. 
Location. Extends northerly from Chincoteague Bay, 
Va., following waterways parallel with Atlantic Ocean 
through Virginia, Maryland, and Delaware, passing 
through neck of land at Ocean View, Del., and land 
between Rehoboth Bay and headwaters of Lewes 
River, entering Delaware Bay at or near town of 
Lewes, a total distance of about 70 miles. (See U.S. 
Coast and Geodetic Survey Charts 1218, 1219, and 
1220.) 
Previous projects. For details see page 382, Annual 
Report for 1932. 
Existing project. Provides for maintenance of three 
bridges built by the Government at Ocean View, Del., 
under previous project. Existing project was adopted 
by 1910 River and Harbor Act (H. Doc. 538, 59th 
Cong., 1st sess.). Latest published map is in House 
Document 128, 67th Congress, 2d session. 
Local cooperation. Fully complied with. 
Terminal facilities. See page 232, Annual Report for 
1962. 
Operations and results during fiscal year. Maintenance, 
hired labor: Costs were $2,133 for real estate activities 
and $370 for administrative work. 
Condition at end of fiscal year. For details see page 245, 
Annual Report for 1963. Costs under existing project, 
excluding $2,000 contributed by State of Delaware, 
were $35,958 for maintenance. 
10. INLAND WATERWAY FROM 
DELAWARE RIVER TO CHESAPEAKE 
BAY, DEL., AND MD. 
Location. Begins at Reedy Point on Delaware River, 
about 41 miles below Philadelphia, Pa., and passes 
through sea level Chesapeake and Delaware Canal, a 
distance of 14 miles, to Back Creek, at Chesapeake 
City, Md. It then passes for 5 miles down Back Creek, 
thence 9 miles down Elk River to Chesapeake Bay and 
thence 18 miles down Chesapeake Bay to a point near 
Pooles Island. A branch channel connects Delaware 
River at Delaware City, Del., with main channel at a 
point about 1 1/2 miles west of Reedy Point. (See U.S. 
Coast and Geodetic Survey Charts 294, 1226, 570, and 
572.) 
Previous projects. For details see Annual Report for 
1934, page 242, and Annual Report for 1938, page 312. 
Existing project. A channel 35 feet deep and 450 feet 
wide from Delaware River through Elk River and 
Chesapeake Bay to water of natural 35-foot depth in 
Chesapeake Bay including a cutoff at Penn Central 
Railroad crossing, and having a minimum radius of 
curvature of 7,000 feet at bends; a high level, fixed 
railroad bridge with vertical clearance of 135 feet and 
horizontal clearance of 600 feet at the railroad crossing 
over the cutoff; (economic study of railroad crossing 
requested by Bureau of the Budget resulted in 
construction of a single track vertical lift bridge in lieu 
of a high-level fixed railroad bridge), high-level fixed 
highway bridges over canal at Reedy Point, St. 
Georges, Summit, and Chesapeake City; a bascule 
drawbridge across Delaware City Branch Channel; 
extension of entrance jetties at Reedy Point; and 
anchorage in Elk River, 35 feet deep and 1,200 feet 
wide, with an average length of 3,700 feet; enlargement 
of anchorage and mooring basin in Back Creek to 
afford an area about 400 feet wide, 1,000 feet long, and 
12 feet deep; dredging Delaware City Branch Channel 
to 8 feet deep and 50 feet wide, and deepening existing 
basin to same depth; revetment of banks of canal as 
required between Delaware and Elk Rivers, and on 
banks of Delaware City Branch Channel east of Fifth 
Street Bridge; and construction of bulkheads. Total 
length of section included in project, excluding 
Delaware City Branch Channel, which is about 2 miles 
long, is about 46 miles. All depths refer to plane of 
mean low water in Delaware River. Mean tidal range 
at Delaware River entrance is 5.4 feet and in Elk River 
at mouth of Back Creek, 2.2 feet. Extreme tidal range is 
from 6.3 feet above mean high water to 3 feet below 
mean low water. 
Original cost of canal including purchase was $10, 
709,755; estimated cost of new work for modifications 
of 1935 and 1954 is $127,274,000 (July 1970). Total 
estimated cost of newwork including original purchase 
is $137,983,755. Portion of project comprising 
completion of Delaware City Branch Channel from a 
point 400 feet east of Fifth Street Bridge to its junction 
134

PHILADELPHIA, PA., DISTRICT 
with canal is to be restudied and excluded from 
foregoing estimate. Estimated cost of this portion is 
$145,000 (July 1954). (See Table 3-B at end of chapter 
for Acts authorizing existing project.) 
Local cooperation. River and Harbor Act of 1954 
provided that local interests furnish lands and rightsof-
way required for bridges. Assurances accepted and 
approved February 16, 1955. Requirements for 
Summit and Reedy Point Bridges have been met. 
Terminal facilities. Ample mooring facilities at eastern 
and western ends of canal and bulkheads at Delaware 
City and St. Georges were constructed by the United 
States. A small-boat harbor was provided and a wharf 
constructed at Chesapeake City. Facilities are 
considered adequate for existing commerce. 
(See Table 3-D on operations and results during 
fiscal year at end of chapter.) Other costs were $29,774 
for design, boring and survey contracts. New work, 
hired labor; Engineering and design cost $549,291. 
Real estate activities cost $6,688. Maintenance, 
contract; Rehabilitation of Delaware City Bulkheads 
commenced June 13, 1969 and completed September 
11, 1969 at a cost of $27,931. Costs preparatory to 
revision of electrical system at St. Georges Bridge were 
$6,958 and for resurfacing St. Georges Bridge Deck 
were $70,865. 
Maintenance, hired labor; General operation of the 
waterway continued throughout the fiscal year at a cost 
of $362,972. Operation and maintenance of bridges, 
night lighting, buildings, grounds and utilities 
continued at a cost of $240,430; other hired labor costs 
were; maintenance of auxiliary works and drainage, 
repair of banks and mosquito control, $191,150; 
removal of obstruction and debris, $23,653; 
engineering, reimbursements and other expenses; $157, 
491; and real estate activities $10,852. 
Condition at end of fiscal year. Existing project is about 
87 complete. Channel 27 feet deep and 250 and 400 
feet wide, Delaware River to Pooles Island, was 
completed in 1938. High level fixed highway bridges 
were completed at St. Georges (4-lane) in 1942; at 
Chesapeake City (2-lane) in 1949; and at Summit (4- 
lane) in 1960. Relocation of Penn Central Railroad 
bridge was completed December 21, 1965. Channel 
work for Part II is about 76 percent complete. Work 
remaining consists of completing channel enlargement 
to 35 feet deep and 450 feet wide from Delaware River 
through Elk River and Chesapeake Bay to deep water 
in the bay and dredging an anchorage in Elk River. 
Deepening Delaware City Branch Channel from 6 to 8 
feet from a point 400 feet east of Fifth Street Bridge to 
its junction with the canal has been deferred for study. 
Total cost of existing project toJune 30, 1970 was $139, 
351,356, of which $100,527,795 was for new work ($4, 
756,248 emergency relief funds and $95,771,547 
regular funds), and $38,823,561 regular funds for 
maintenance. Deferred charge undistributed for 
amortization of cost of disposal area was $179,466. 
11. MANASQUAN RIVER, N. J. 
Location. This small stream flows in eastern part of 
New Jersey, rises near Freehold, flows easterly and 
empties into the Atlantic Ocean, about 26 miles south 
of Sandy Hook. (See U.S. Coast and Geodetic Survey 
Chart No. 795.) 
Previous projects. For details see Annual Report for 
1909, page 186, and Annual Report for 1938, page 269. 
Existing project. A channel 14 feet deep and 250 feet 
wide, protected by jetties and other works, extending 
from the Atlantic Ocean to inner end of north jetty, 
thence 12 feet deep and 300 feet wide to within 700 feet 
of New York & Long Branch Railroad bridge, thence 
of same depth and narrowing to 100 feet wide to within 
300 feet of bridge; for a widening on northerly side of 
channel of 200 feet for 3,150 feet to a depth of 8 feet; for 
a 19-acre anchorage to 10 feet deep on south side of 
channel and for a 27.5-acre anchorage to 12 feet deep 
about 0.5 mile west of route 35 highway bridge. Section 
included in project is about 1.5 miles long. Mean tidal 
range is 3.7 feet at inner end of inlet and 4 feet at ocean 
end; mean range of spring tides, 4.4 and 4.8 feet, 
respectively; irregular fluctuations due to wind and 
barometric pressure vary from 2.7 feet below to 7.5 feet 
above mean low water at inner end of inlet. Project, 
excluding 10- and 12-foot anchorages, cost $518,243. 
Estimated cost (1958) for 10- and 12-foot anchorages 
portion of project considered inactive is $504,000. (See 
Table 3-B at end of chapter for Acts authorizing 
existing project.) 
Local cooperation. River and Harbor Act of 1945 
provides that local interests must furnish lands and 
rights-of-way for construction and future maintenance 
and hold the United States free from damages. 
Assurances to date have been complied with. 
Terminal facilities. Five landings with a total wharfage 
of 700 feet used by commercial fishermen, and 7 
landings and boat basins for pleasure craft. Existing 
facilities are considered adequate for present 
requirements. 
Operations and results during fiscal year. Maintenance, 
hired labor: U. S. Hopper Dredge Hyde, dredging from 
March 29, 1970 to April 11, 1970 removed 63,780 
cubic yards of material at a cost of $70,824. Costs of 
$820 incurred for miscellaneous engineering and 
administrative work. pertinent to the study area were 
received from SCS on 20 May 70. 
Condition at end of fiscal year. Existing project was 
completed in June 1963. Dredging 19-acre anchorage 
south of channel and 27.5-acre anchorage west of 
highway bridge is in the inactive category. Controlling 
depth in channel at local mean low water (April 1970) 
was 10.2 feet from the Atlantic Ocean to insure ends of 
jetties and thence 7.8 feet to 300 feet east of railroad 
bridge. Costs under existing project, excluding $300, 
000 (new work) contributed funds expended, were 
$518,249 for new work, $555,600 for major 
135

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
rehabilitation, and $1,720,556 for maintenance, a total 
of $2,794,405. 
12. NEW JERSEY INTRACOASTAL 
WATERWAY 
Location. A sea level inland water route 
approximately parallel with New Jersey coast, extends 
from Atlantic Ocean at Manasquan Inlet, about 26 
miles south of Sandy Hook, N.J., to Delaware Bay 
about 3 miles above Cape May Point. Waterway 
extends through inlet and up Manasquan River about 
2 miles; thence by Point Pleasant Canal through high 
ground for 2 miles to head of Barnegat Bay. It then 
passes through a series of bays, lagoons, and 
thoroughfares along New Jersey coast to Cape May 
Harbor; thence across Cape May County to Delaware 
Bay through a land cut by way of New England Creek 
basin. (See U.S. Coast and Geodetic Survey Charts 
234, 795, 825, 826, 827, 1216, 1217, 1218, and 1219.) 
Existing project. This provides for a channel 12 feet 
deep at mean low water and generally 100 feet wide, 
extending from the Atlantic Ocean at Manasquan 
Inlet, N.J., to Delaware Bay above Cape May, N.J., by 
the further improvement of Manasquan River and 
Inlet, N.J., and the present New Jersey Intracoastal 
Waterway, and by the construction of a canal of similar 
dimensions from Cape May Harbor to Delaware Bay 
via the New England Creek basin, with adequate 
jetties at the Delaware Bay entrance. The total length 
of the project is about 117 miles. Normal tide range in 
sections of the waterway remote from inlets is 0.5 foot. 
Near the inlets the mean tidal range generally is 3 feet; 
in the ocean, 4 feet; at the head of Cape May Harbor, 
4.6 feet; and in Delaware Bay, near the entrance, 4.7 
feet. Estimated cost for newwork is $54,000 (July 1954), 
exclusive of $1,824,940 Navy Department funds and 
$99,000 contributed by local interests. Portion of 
project extending from Manasquan River to Cape 
May Harbor is to be restudied and excluded from new 
work cost estimate. Estimated cost of this portion is $6, 
470,000 (July 1954). Existing project was adopted by 
1945 River and Harbor Act (H. Doc. 133, 76th Cong., 
1st sess.). Latest published map is in project document. 
River and Harbor Act of 1946 (Public Law 525, 79th 
Cong., 2d sess., as extended by Public Law 240, 82nd 
Cong.), authorized use for a period not to exceed 6 
years, of funds from appropriations heretofore or 
hereafter made for maintenance and improvement of 
rivers and harbors, for maintenance of canal from 
Cape May Harbor to Delaware Bay constructed as an 
emergency wartime project with Navy Department 
funds, including cost of maintaining temporary 
railroad and seashore highway bridges over canal. 
Local cooperation. The project is subject to the 
conditions that the State of New Jersey cede to the 
United States all right, title, and interest that it has 
acquired to lands, easements, rights-of-way, and 
structures other than bridges for the Bayhead- 
Manasquan Canal; that the State of New Jersey 
furnish, free of cost to the United States, all lands, 
easements, rights-of-way, and disposal areas required 
for construction of the Cape May Canal and for 
improvement of the proposed waterway and for their 
subsequent maintenance; that local interests provide, 
maintain, and operate suitable bridges over the 
waterway; that the State of New Jersey donate to the 
United States the navigation aids in use on the present 
New Jersey Intracoastal Waterway; and that the State 
of New Jersey hold and save the United States and its 
agents free from any claims for damages resulting from 
the work of improvement. Compliance with these 
conditions was completed January 15, 1954, except 
that local interests are required to furnish disposal 
areas for the construction and the subsequent 
maintenance of the proposed improvement. 
Terminal facilities. See Annual Report for 1962. 
Operations and results during fiscal year. Maintenance, 
contract: Dredging miscellaneous shoals from Great 
Bay to Cold Spring Inlet commenced June 3, 1969, and 
completed September 17, 1969. Removed 216,238 
cubic yards of material at a cost of $176,025. Dredging 
in Great Bay commenced May 20, 1970 and completed 
June 30, 1970. Removed 177,000 cubic yards of 
material at a cost of $104,337. Costs of $36,572 were 
incurred for work in preparation for rehabilitation of 
bulkheads at Point Pleasant Canal. 
Maintenance, hired labor: $7,559 for real estate 
activities; $1,989 for stream gaging; $1,758 for 
preparation of State pamphlets; and $108,012 for 
miscellaneous engineering, supervision and 
inspections. 
Condition at end of fiscal year. Existing project is about 
25 percent complete. A canal 12 feet deep and 100 feet 
wide from Cape May Harbor to Delaware Bay was 
completed in 1942; two parallel stone jetties at 
Delaware Bay entrance and a temporary highway and 
a railroad bridge in 1944, all with Navy Department 
funds. Work remaining, dredging a channel 12 feet 
deep and 100 feet wide from Atlantic Ocean at 
Manasquan Inlet to Cape May Harbor, has been 
deferred for restudy; however, the project between 
Ottens Harbor and Richardson Channel and from that 
point to Cape May are being maintained to 10 feet and 
12 feet, respectively, since they were originally dredged 
to these depths by the State. 
13. SCHUYLKILL RIVER, PA. 
Location. Rises in Schuylkill County, Pa., flows 
generally southeasterly 150 miles, and empties into 
Delaware River at Philadelphia, Pa. (See U.S. Coast 
and Geodetic Survey Charts 295 and 280.) 
Previous projects. For details see page 325, Annual 
Report for 1932. 
Existing project. This provides for a channel 33 feet 
deep and 400 feet wide in Delaware River to the mouth 
and within the river to 29th Street, three-fourths mile 
136

PHILADELPHIA, PA., DISTRICT 
above the mouth; thence the same depth and 300 feet 
wide to Passyunk Avenue Bridge, 3 1/2 miles above the 
mouth; thence 26 feet deep and 200 feet wide to Gibson 
Point, 4 1/2 miles above the mouth; and thence 22 feet 
deep and 200 feet wide to University Avenue Bridge, 6 
miles above the mouth, including widening at bends. 
The total length of the section included in the project is 
about 6 1/2 miles. All depths refer to the plane of mean 
low water. The mean tidal range at the mouth is 5.9 
feet and at Grays Ferry Bridge about one-half mile 
below University Avenue Bridge, 6.4 feet. The extreme 
tidal range, due to freshets and prolonged heavy winds, 
is about 14 feet. 
The cost for new work for the completed existing 
project was $2,809,007. (See Table 3-B at end of 
chapter for Acts authorizing existing project.) 
Local cooperation. The River and Harbor Act of July 
24, 1946, imposed the condition that the city of 
Philadelphia agree to remove 60,000 cubic yards, place 
measurement, of material annually from that portion 
or those portions of the project which the District 
Engineer may designate until such time as adequate 
municipal sewage-treatment works are constructed 
and placed in effective operation. Compliance with this 
condition has been met through the completion of 
sewage-treatment works by the city of Philadelphia. 
All other requirements have been fully complied with. 
Terminal facilities. There are 38 wharves, piers, and 
docks within limits of improvement. Facilities are 
considered adequate for existing commerce. (For 
further details see Port Series No. 7-Revised 1967- 
Corps of Engineers.) 
Operations and results during fiscal year. Maintenance, 
contract: Costs of $104,878 incurred in raising 12,500 
linear feet of existing dike and constructing 800 linear 
feet of dike in the Government furnished disposal area 
in connection with dredging in the 33-foot channel at 
Passyunk Avenue to mouth. Work commenced April 2, 
1970 and still in progress at the end of fiscal year. 
Maintenance, hired labor: Operation of stream 
gages and miscellaneous engineering and 
administrative work cost $27,561. 
Condition at end of fiscal year. Existing project was 
completed in September 1962. For details see Annual 
Report for 1962. Costs under existing project were $2, 
809,007 for new work and $15,030,483 for 
maintenance, a total of $17,839,490. 
14. WATERWAY FROM INDIAN RIVER 
INLET TO REHOBOTH BAY, DEL. 
Location. In southeasterly part of Sussex County, 
connects Rehoboth Bay with Indian River Bay by way 
of Big Ditch. (See U.S. Coast and Geodetic Survey 
Chart No. 1219.) 
Existing project. This provides for a channel 6 feet deep 
and 100 feet wide from water of 6-foot depth in 
Rehoboth Bay to water of the same depth in Indian 
River Bay by way of Big Ditch. The total length of the 
section included in the project is about 2.7 miles. The 
mean tidal range in the vicinity of the project in 
Rehoboth Bay is 0.5 foot; in Indian River Bay 0.9 foot. 
The extreme tidal range is from 1.5 feet below mean 
low water to about 2.5 feet above mean high water. 
Cost for new work for completed project was $90,908, 
exclusive of $20,000 contributed by local interests. 
Existing project was adopted by River and Harbor Act 
of May 17, 1950 (H. Doc. No. 304, 81st Cong., 1st sess.). 
The latest published map is in the project document. 
Local cooperation. The act authorizing the project 
provides that local interests shall give assurances 
satisfactory to the Secretary of the Army that they will 
(a) provide without cost to the United States all lands, 
easements, rights-of-way, and suitable disposal areas 
for initial work and subsequent maintenance when and 
as required; (b) hold and save the United States free 
from damages due to the construction and subsequent 
maintenance of the project, including such damages as 
may occur to public or leased oyster beds; and (c) make 
a cash contribution of $20,000 toward the construction 
of the project. Assurances of local cooperation were 
approved on February 27, 1956. Conditions of local 
cooperation have been complied with except that local 
interests are required to furnish suitable spoil-disposal 
areas for subsequent maintenance as required. 
Terminal facilities. There are no terminal or transfer 
facilities in the area that are fully open to public use. 
However, existing facilities that are available on a 
limited basis are adequate for the present demand, and 
can be expected to expand to meet future needs. 
Operations and results during fiscal year. Maintenance, 
contract: Costs of 3,913 were incurred for work 
preparatory to dredging miscellaneous shoals. 
Condition at end of fiscal year. Existing channel was 
completed on July 7, 1956. Controlling depth at mean 
low water in August 1961 was 4.6 feet. Costs under 
existing project, excluding $20,000 contributed funds 
expended for new work, were $90,908 for new work and 
$23,935 for maintenance, a total of $114,843. 
15. WILMINGTON HARBOR, DEL. 
Location. Formed by Christina River, which rises in 
New Castle County, Del., flows northeasterly 16 miles, 
passing through city of Wilmington, Del., and empties 
into Delaware River about 29 miles below 
Philadelphia, Pa. (See U.S. Coast and Geodetic Survey 
Chart 294.) 
Previous projects. For details see page 1785 of Annual 
Report for 1915 and page 308 of Annual Report for 
1938. 
Existing project. This provides for a channel 35 feet 
deep and 400 feet wide from west edge of Delaware 
River ship channel to Lobdell Canal, a distance of 
about 1.2 miles; thence 21 feet deep and 250 feet wide 
for a distance of eight-tenths mile to the mouth of 
Brandywine River; thence the same depth and 200 feet 
wide for a distance of about 2.2 miles to a point 
137

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
approximately 4.2 miles from the Delaware River ship 
channel; thence decreasing to a depth of 10 feet in a 
distance of 750 feet to Penn Central Railroad bridge 
No. 4; and thence 7 feet deep and 100 feet wide for a 
distance of about 5.6 miles to Newport, Del., 
approximately 9.9 miles above the Delaware River 
ship channel, including a turning basin 35 feet deep 
opposite the Wilmington Marine terminal and 
extending upstream from the mouth to Lobdell Canal, 
200 feet wide, 2,900 feet long on the north side of the 
channel and decreasing to a length of 2,000 feet on the 
north side of the basin. It also provides for the removal 
of about 1,200 feet of the outer end of a stone-filled, 
pile-and-timber-crib jetty constructed 2,150 feet long 
on the north side of the entrance; for a steel sheet-pile 
jetty 2,300 feet long, with 120-foot inshore wing, on the 
south side of the entrance, and for a V-shaped stonefilled 
pile-and-timber jetty at the mouth of Brandywine 
River 430 feet long along the north side of the 
Brandywine and 260 feet long on the Christina. All 
depths refer to the plane of mean low water. The mean 
tidal range at the mouth is 5.6 feet, and at Newport 3.9 
feet. The extreme tidal range due to prolonged heavy 
winds is about 13 feet. (See Table 3-B at end of chapter 
for Acts authorizing existing project.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 18 piers, wharves, and 
docks within improvement. Facilities considered 
adequate for existing commerce. (For further details 
see Port Series No. 8, revised 1966 - Corps of Engineers). 
Operations and results during fiscal year. Maintenance, 
contract: Final payment for maintenance dredging of 
harbor resulted in a credit of $41,098. Costs of $145,864 
incurred in increasing the disposal area dike section at 
Edgemoor Disposal Area in two locations in connection 
with maintenance dredging in Wilmington Harbor. 
Work commenced May 7, 1970 and still in progress at 
the end of fiscal year. 
Maintenance, hired labor: Real estate activities, 
operation of stream gages and miscellaneous 
engineering cost $11,540. 
Condition at end of fiscal year. Existing project was 
completed in 1962. (For details see page 222, Annual 
Report for 1962.) 
Total cost of existing project to June 30, 1970, is $13, 
972,231, of which $1,552,604 is for new work ($206,177 
emergency relief funds and $1,346,427 regular funds) 
and $12,419,627 regular funds for maintenance. 
16. RECONNAISSANCE AND CONDITION 
SURVEYS 
(See Table 3-E at end of chapter.) 
17. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See Table 3-F at end of chapter.) 
18. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION Navigation Activities 
Pursuant to Section 107, Public Law 86-645 
(Preauthorization) 
Fiscal year costs were $2,530 for Bass Harbor, 
Somers Point, N.J.; $2,403 for Ships Channel, Somers 
Point, N.J.; $1,821 for Bristol Marina, Pa.; $9,553 for 
Delaware River at Tinicum Township, Pa.; and $88 
for Philadelphia (Hog Island Marina), Pa. 
BEACH EROSION CONTROL 
19. ATLANTIC CITY, N.J. 
Location. On New Jersey coast about 45 miles 
northeast of Cape May, southern tip of the State at 
entrance to Delaware Bay. It is about 60 miles from 
Philadelphia, Pa., and 125 miles from New York City. 
(See U.S. Coast and Geodetic Survey Charts 826 and 
1217. 
Existing project. Provides for Federal participation in 
first cost of protective and improvement measures at 
Atlantic City, N.J., under policy in Public Law 727, 
79th Congress, as modified by Public Law 87-874. 
These measures comprise; Replacing a damaged 
concrete seawall with steel sheet-pile wall; constructing 
a stone jetty about 4,800 feet long extending from 
Brigantine Island parallel to and about 2,300 feet from 
Maine Avenue bulkhead; revetment of bulkhead along 
Maine Avenue; constructing one new groin and 
extending existing groins along Maine Avenue; 
artificial placement of sandfill to widen ocean and inlet 
beaches; extending Oriental Avenue jetty; 
constructing five new timber groins on ocean frontage; 
extension of stone groin at Vermont Avenue; and 
periodic nourishment of the restored beach for 10 years 
after first nourishment is placed. Existing project was 
adopted by 1954 River and Harbor Act (H. Doc. 538, 
81st Cong., 2d sess.) and 1965 River and Harbor Act 
(H. Doc. 325, 88th Cong., 2d sess., contains latest 
published map). Estimated Federal share of cost of new 
work is $4,310,000 (July 1970). Estimated cost to local 
interests is $5,440,000 (July 1970). 
Local cooperation. Local interests must adopt 
recommended plan of restoration and protection; 
submit for approval by the Chief of Engineers, before 
starting work, detailed plans and specifications and 
arrangements for prosecuting work; assure 
maintenance of protective and improvement measures 
during their useful life; provide lands and rights-ofway; 
hold the United States free from damages; insure 
against water pollution; and assure continued public 
ownership of beach. 
Operations and results during fiscal year. New work, 
contract: Emergency beach nourishment commenced 
June 13, 1970 and was in progress at the end of the 
fiscal year. Approximately 407,000 cubic yards of sand 
placed. 
138

PHILADELPHIA, PA., DISTRICT 
New work, hired labor: Costs of $2,905 incurred for 
miscellaneous engineering and administrative costs. 
Condition at end of fiscal year. Project was started in 
1948 and is about 54 percent complete, including 
seventh section of Brigantine Island jetty for which 
only a partial Federal participation payment has been 
made. Along ocean frontage, sandfill was hydraulically 
placed in 1948 and five timber groins were constructed 
in 1950. A damaged concrete seawall was replaced in 
1951. Extensions of jetties at Oriental and Vermont 
Avenues were completed in 1962. Along Maine 
Avenue, revetment is 17 percent complete. Extensions 
of six groins and construction of one groin is complete. 
Jetty off Brigantine Island is about 77 percent 
complete. Placement of 580,000 cubic yards of sand for 
periodic nourishment was accomplished in 1963. Work 
remaining is to complete revetment along Maine 
Avenue; complete stone jetty off Brigantine Island 
which has been deferred pending results of the New 
Jersey Coastal Inlets and Beach Study; place initial 
sandfill along Maine Avenue frontage; and place sand 
for periodic nourishment. 
20. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECTS 
(See Table 3-G at end of chapter.) 
21. BEACH EROSION CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
(See Table 3-H at end of chapter.) 
FLOOD CONTROL 
22. BELTZVILLE LAKE, PA. 
Location. Damsite is on Pohopoco Creek about 4 1/2 
miles upstream from its confluence with Lehigh River 
and 4 miles east of Lehighton, Pa. (See Geological 
Survey Quadrangle Map for Lehighton, Pa. - 1960.) 
Existing project. A multiple purpose development 
project to provide water supply, flood control, and 
recreation. Plan of improvement provides for an earth 
and rock fill dam 4,500 feet long rising 160 feet above 
creekbed; a spillway around north end of dam; and 
gate-control outlet works discharging through a 
conduit on rock along right abutment. The lake, a unit 
of comprehensive plan for flood control and other 
purposes of Delaware River Basin, will have a reservoir 
capacity of 68,200 acre-feet at spillway crest level with 
1,200 acre-feet of inactive storage, 40,000 acre-feet for 
water supply and recreation, and 27,000 acre-feet for 
flood control. (For details see H. Doc. 522, 87th Cong., 
2d sess.) Design changes, based on planning to July 
1965, indicate an earthfill dam 4,200 feet long rising 
170 feet above creekbed, a controlled reservoir capacity 
of 68,250 acre-feet at spillway crest with 1,390 acre-feet 
of inactive storage, 41,220 acre-feet for water supply, 
water quality control and recreation. Estimated cost of 
project (July 1970) is $22,200,000 including $6,100,000 
required non-Federal reimbursement for costs 
allocated to water supply storage during life of project 
after use of this storage is initiated; ultimate Federal 
cost is $16,100,000. 
Local cooperation. Project was approved subject to 
certain requirements of cooperation by local interests 
as defined in approved House Document. Resolution of 
Delaware River Basin Commission providing 
assurances of repayment of water supply and pollution 
control costs was accepted June 7, 1965. A contract for 
repayment of water supply costs was signed October 26, 
1966. 
Operations and costs during fiscal year. New work, 
contract: Relocation of Pine Run Road commenced in 
August 1968 and completed September 10, 1969 at a 
cost of $5,930 for this fiscal year. Construction of 
embankment spillway and outlet works continued and 
in progress at close of fiscal year; costs of $4,241,996 
incurred. Construction of access roads completed at a 
cost of $3,073. Other costs were $43,398 for buildings, 
grounds and utilities; $8,320 for operation of stream 
gages; $98,655 for relocation of water line; $965 for 
installation of service pole; $86,090 for reservoir 
clearing; $2,635 for permanent operation equipment; 
and $96,175 for land payments. 
New work, hired labor: Costs for engineering and 
design and training dam tender were $166,467. Costs 
for land acquisition and real estate management were 
$25,593. 
Condition at end offiscalyear. Project is about 90 percent 
complete. Acquisition of the necessary land is about 99 
percent complete. 
23. BLUE MARSH LAKE, PA. 
Location. Damsite is on Tulpehocken Creek about 1 
1/2 miles upstream from its confluence with Plum 
Creek and about 6 miles northwest of Reading, Pa. 
(See Geological Survey quadrangle sheet, Bernville, 
Pa.) 
Existing project. A multiple purpose development 
project to provide supplies of water, flood control, and 
recreation. Plan of improvement provides for an earth 
and rock fill dam, 1,775 feet long and rising 98 feet 
above creekbed, with a spillway about 1,500 feet south 
of dam, and gate-controlled outlet works discharging 
through a conduit on rock along right abutment. The 
lake, a unit of comprehensive plan for flood control and 
other purposes of Delaware River Basin, will have a 
capacity of 50,010 acre-feet at spillway crest level, with 
3,000 acre-feet of inactive storage, 14,620 acre-feet for 
water supply and recreation, and 32,390 acre-feet for 
flood control. (For details see H. Doc. 522 87th Cong., 
2d sess.) Estimated cost of project (July 1970), $27,200, 
000 includes $5,900,000 required non-Federal 
reimbursement for costs allocated to water supply 
storage during life of project after use of this storage in 
initiated. Existing project was authorized by 1962 
139

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Flood Control Act (H. Doc. 522, 87th Cong., 2d sess., 
contains latest published maps). 
Local cooperation. Project was approved, subject to 
certain requirements by local interests, as prescribed in 
House Document cited above. Delaware River Basin 
Commission on December 29, 1964, adopted a 
preliminary resolution providing for repayment of 
water supply costs. 
Operations and results during fiscal year. New work, 
contract: Costs were $5,335 for real estate surveys; $2, 
703 for operation of stream gages; and $2,728 for aerial 
photos. New work, hired labor: Design and 
miscellaneous engineering costs were $119,968; $37, 
109 for real estate activities. 
Condition at end of fiscal year. Continued engineering 
and design and real estate surveys preparatory to 
acquisition of land. 
24. FRANCIS E. WALTER DAM, PA. 
Location. Reservoir is in northeastern Pennsylvania 
on Lehigh River between White Haven and 
Stoddartsville. Dam is about 0.4 mile below mouth of 
Bear Creek, about 60 miles above city of Allentown 
and 77 miles above confluence of Lehigh River and 
Delaware River at Easton, Pa. (See Geological Survey 
Quadrangle Sheet, Stoddartsville, Pa.) 
Existing project. Plan of improvement authorized by 
1946 Flood Control Act (H. Doc. 587, 79th Cong., 2d 
sess.) provided for a single purpose flood control 
reservoir. Modification of project, authorized by 1962 
Flood Control Act (H. Doc. 522, 87th Cong., 2d sess.), 
provides for a multiple-purpose development for water 
supply and recreation in addition to present singlepurpose 
flood control project. Plan of improvement 
requires altering spillway increasing height of dam, 
extending outlet tunnel by addition of a concrete 
conduit, and constructing new dikes and raising 
existing dikes. Modified dam will rise 263 feet above 
riverbed and be 3,500 feet long. Reservoir 
modification, a unit of comprehensive plan for flood 
control and other purposes of Delaware River Basin, 
will have a reservoir capacity of 180,000 acre-feet 
spillway crest level with 2,000 acre-feet of inactive 
storage, 70,000 acre-feet for water supply and 
recreation and 108,000 acre-feet for flood control. 
Estimated Federal cost of new work (July 1970) is $31, 
173,000 including $13,970,000 required non-Federal 
reimbursement for costs allocated to water supply 
storage during life of project after use of this storage is 
initiated. 
Local cooperation. None required under 1946 Flood 
Control Act. Under 1962 Flood Control Act, project 
was approved subject to certain requirements by local 
interests, as defined in House Document 522 cited 
above. 
Operations and results during fiscal year. Maintenance, 
contract; Costs of $24,984 were incurred in connection 
with regrading banks at outlet works. Commenced July 
14, 1969 and completed September 15, 1969. 
Maintenance, hired labor: Operation and 
maintenance of dam and reservoir cost $34,205; 
instrumentation cost $55,898; miscellaneous 
engineering, inspection, real estate activities and 
operation of stream gages cost $42,543. 
Condition at end of fiscal year. Project as authorized 
under the 1946 Flood Control Act was completed June 
1961. Settlement for lands was completed October 
1962. 
25. GENERAL EDGAR JADWIN DAM AND 
RESERVOIR, PA. 
Location. In Dyberry Creek valley in central part of 
Wayne County, Pa., between borough of Honesdale 
and village of Tanners Falls. Dam is about 3 miles 
above confluence of Dyberry Creek and Lackawaxen 
River in Honesdale and 29 miles above confluence of 
Lackawaxen and Delaware Rivers. (See Geological 
Survey Quadrangle Sheet, Honesdale, Pa.) 
Existing project. A single-purpose flood control 
reservoir with a capacity of 24,500 acre-feet formed by 
an earth embankment, about 1,255 feet long at crest 
and rising 109 feet above creekbed. It also has a tunnel, 
with intake structure and stilling basin, in left 
abutment, a chute-type spillway and stilling basin in 
left abutment. Reservoir controls runoff from a 
drainage area of 65 square miles which is 91 percent of 
watershed of Dyberry Creek and 39 percent of 
Lackawaxen River watershed above Honesdale, Pa. 
Construction of project was authorized by 1948 Flood 
Control Act (H. Doc. 113, 80th Cong., 1st sess.). 
Estimated Federal cost of new work is $4,100,000. Non- 
Federal funds not required. 
Local Cooperation. Assurances of compliance with 
requirements of local cooperation were accepted July 
30, 1956. For details see page 251, Annual Report for 
1962. 
Operations and results during fiscal year. Maintenance, 
hired labor: Costs of $10,432 were incurred for 
operation and maintenance of dam and reservoir; $27, 
343 for embankment investigations; $78,336 for 
remedial grouting; and $7,683 for stream gages, real 
estate activities, miscellaneous engineering and related 
work. 
Conditions at end offiscalyear. Project was completed in 
June 1960. 
26. PROMPTON LAKE, PA. 
Location. In Lackawaxen River Valley in central part 
of Wayne County, Pa., between borough of Prompton 
and village of Aldenville. Dam is within corporate 
limits of Prompton, 4 miles upstream from Honesdale, 
Pa., and approximately 30 miles above confluence of 
Lackawaxen and Delaware Rivers. (See Geological 
Survey Quadrangle Sheet, Honesdale, Pa.) 
140

PHILADELPHIA, PA., DISTRICT 
Existing project. Plan of improvement authorized by 
1948 Flood Control Act (H. Doc. 113, 80th Cong., 1st 
sess.) provided for a single-purpose flood control 
reservoir. Modification of project authorized by 1962 
Flood Control Act (H. Doc. 522, 87th Cong., 2d sess.) 
provides for multiple-purpose development for water 
supply and recreation in addition to present singlepurpose 
flood control project. Plan of improvement 
requires construction of a control tower with gates and 
service bridge, placing an impervious blanket on valley 
walls and floor upstream from dam, widening spillway, 
and clearing land and relocating roads in reservoir. 
Dam, completed under 1948 Flood Control Act which 
will not be modified, is 1,230 feet long and rises 140 feet 
above riverbed. Existing spillway, cut into rock of right 
abutment, will be modified and present uncontrolled 
outlet works discharging into a concrete conduit along 
right bank, will be provided with gates and a control 
tower. Reservoir modification, a unit of comprehensive 
plan for flood control and other purposes of Delaware 
River Basin has a capacity of 52,000 acre-feet; 3,500 
acre-feet inactive storage, 28,200 acre-feet for water 
supply and recreation, and 20,300 acre-feet for flood 
control. Estimated Federal cost of new work (July 
1970) is $14,812,000 including $9,310,000 required 
non-Federal reimbursement for costs allocated to water 
supply storage during life of project after use of this 
storage is initiated. 
Local cooperation Project modification was approved 
subject to certain requirements by local interests, as 
defined in House Document 522 cited above. 
Assurances of compliance under Flood Control Act of 
1948 have been met. Delaware River Basin 
Commission on March 18, 1966, gave their view that 
the need for water supply is not urgent at this time. 
Study is continuing in order to resolve this questi n 
before completion of preconstruction planning. 
Operations and results during fiscal year. Maintenance, 
hired labor: Operation and maintenance of dam and 
reservoir cost $22,350; real estate activities, operation 
of stream gages, miscellaneous engineering and 
adjustments cost $23,246. 
Condition at end of fiscal year. Project as authorized 
under the 1948 Flood Control Act was completed in 
November 1960. (For details, see page 358, Annual 
Report for 1963.) Work accomplished under the 1962 
Flood Control Act was advance engineering and 
design. 
27. TREXLER LAKE, PA. 
Location. Damsite is on Jordan Creek about one-half 
mile downstream from its confluence with Mill Creek 
and 8 miles northwest of Allentown, Pa. (See 
Geological Survey Quadrangle Sheet, W. Allentown, 
Pa.) 
Existing project. A multiple-purpose development 
project to provide supplies of water, flood control, and 
recreation. Plan of improvement provides for a 
concrete gravity type dam 800 feet long rising 120 feet 
above creekbed, a spillway in stream channel, and 
gate-controlled outlet works discharging through 
sluices in spillway section. The lake, a unit of the 
comprehensive plan for flood control and other 
purposes of Delaware River Basin, will have a capacity 
of 39,000 acre-feet at spillway crest with 800 acre-feet 
of inactive storage, 24,200 acre-feet for water supply 
and recreation, and 14,000 acre-feet for flood control. 
(For details see H. Doc. 522, 87th Cong., 2d sess.) 
Estimated cost of project (July 1970), $17,900,000 
includes $10,260,000 required non-Federal 
reimbursement for costs allocated to water supply 
storage during life of project after use of this storage is 
initiated. Existing project was authorized by 1962 
Flood Control Act (H. Doc. 522, 87th Cong., 2d sess., 
contains latest published map). 
Local cooperation. Project was approved subject to 
certain requirements by local interests, as prescribed in 
House Document cited above. The portion of 
assurances dealing with water supply requirements is 
being studied jointly by Delaware River Basin 
Commission and Lehigh-Northampton County 
Planning Commission. 
Operations and results during fiscal year. New work, 
contract: Engineering and design costs were $431 for 
investigation of water quality outlets. New work, hired 
labor: Costs were $856 for real estate activities and $20, 
890 for design and miscellaneous engineering. 
Condition at end of fiscal year. Work accomplished was 
advance engineering and design. 
28. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
To ascertain whether local interests were 
maintaining and operating completed projects as 
required, inspections were made as follows: Allentown, 
Pa., Oct. 1969; Bethlehem, Pa., Oct. 1969; Chester, 
Pa., Dec. 1969 and May 1970; Hawley, Pa. (non- 
Federal project), December 1969; Mt. Holly, N.J., 
Dec. 1969 and May 1970; and Stroudsburg, Pa. (non- 
Federal project), Dec. 1969 and May 1970. 
Local interests are satisfactorily maintaining and 
operating projects in accordance with regulation. 
Fiscal year costs were $2,938. Total costs were $25,733. 
29. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 3-I at end of chapter.) 
141 
451-584 0-72-10

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
30. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION Flood control 
activities pursuant to Section 205, Public Law 838, 80th 
Congress, as amended (preauthorization). (See Table 
3-J at end of chapter.) 
EMERGENCY FLOOD CONTROL 
ACTIVITIES - REPAIR, FLOOD FIGHTING, 
AND RESCUE WORK (PUBLIC LAW 99, 
84TH CONGRESS AND ANTECEDENT 
LEGISLATION) 
Federal fiscal year costs were $14,200 for advance 
preparation and $88,622 for flood emergency 
operations; and $248,887 for rehabilitation. 
MULTI-PURPOSE PROJECTS INCLUDING 
POWER 
31. TOCKS ISLAND LAKE, PA., N.J., AND 
N.Y. 
Location. Danmsite is on Delaware River about 5 miles 
upstream from Delaware Water Gap and 7 miles 
northeast of Stroudsburg, Pa. (See Geological Survey 
quadrangle sheet, Bushkill, Pa. and N.J.) 
Existing project. A multiple-purpose development 
project to provide supplies of water, flood control, 
production of hydroelectric power, and recreation. 
Plan of improvement provides for construction of an 
earth and rock fill dam, 3,000 feet long, and 160 feet 
above riverbed; a spillway cut in rock of left abutment, 
and lined with concrete and provided with crest gates; 
a gate controlled outlet works, discharging through 
tunnels in rock along left bank regulating releases 
either through turbines in powerhouse at downstream 
end of conduits or through bypass channels in 
powerhouse structure. The lake, a unit of 
comprehensive plan for flood control and other 
purposes of Delaware River Basin, will have a reservoir 
capacity of 845,400 acre-feet at top of spillway gates, 
with 96,300 acre-feet of inactive storage and 425,600 
acre-feet for water supply, power and recreation, and 
323,000 acre-feet for flood control. (For details see H. 
Doc. 522, 87th Cong., 2d sess.) Estimated cost of project 
(July 1970) $259 million, including $66,100,000 
required non-Federal reimbursement for costs 
allocated to water supply storage during life of project 
after use of this storage is initiated and reimbursement 
of $34,900,000 for power revenue; ultimate Federal 
cost is $158,000,000. Existing project was authorized by 
1962 Flood Control Act (H. Doc. 522, 87th Cong., 2d 
sess., contains latest published maps). 
Local cooperation. Project was approved, subject to 
certain requirements by local interests, as defined in 
House Document cited above. Delaware River Basin 
Commission on September 13, 1965, adopted a 
resolution providing for repayment of water supply 
costs. 
Operations and results during fiscal year. New work 
contract: Engineering and design costs were; $2,670 for 
model studies; $16,950 for consultant services; and $13, 
520 for stream gaging and hydrological data. Costs for 
land payments were $3,817,651. New work, hired 
labor: Costs for land acquisition were $319,953; 
acquisition of lands for relocations cost $22. Design and 
miscellaneous engineering cost $541,265. 
Condition at end of fiscal year. Continued engineering 
and design and acquisition of land. 
GENERAL INVESTIGATIONS 
32. SURVEYS 
Fiscal year costs were $115,828 for navigation 
studies; $60,239 for flood control studies; 19,521 for 
beach erosion studies; and $23,351 for special studies, a 
total of $218,939. 
33. COLLECTION AND STUDY OF BASIC 
DATA 
Costs and expenditures during fiscal year for flood 
plain information studies were $414,818. Studies of 
following areas were in progress: Christina River, 
Delaware; Red Clay Creek, Delaware; Pennsauken 
Creek, New Jersey; Allentown, Pennsylvania; East and 
West Brandywine Creek, Pennsylvania; Martins 
Creek, Pennsylvania; Perkiomen Creek, Pennsylvania; 
and Ridley Creek, Pennsylvania. 
142

PHILADELPHIA, PA., DISTRICT 
TABLE 3-A COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
1. Absecon Inlet, N.J. New Work 
2. Aquatic Plant 
Control 
3. Barnegat Inlet, 
N. J. 
4. Cohansey River, 
N. J. 
5. Delaware River 
between Philadelphia, 
Pa., and 
Trenton, N. J. 
6. Delaware River, Pa., 
N.J. and Del., 
Philadelphia to the 
Sea 
7. Indian River Inlet 
and Bay, Del. 
8. Inland Waterway, 
Rehoboth Bay to 
Delaware Bay, Del. 
9. Inland Waterway from 
Chincoteague Bay, 
Va. to Delaware Bay, 
Del. 
Approp. 
Cost. 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
51,200 
51,200 
100 
912 
65,756 
65,756 
50,000 
4,886 
146,000 
105,713 
24,457 
35,239 
151,612 
142,912 
11,000 
31,238 
102,658 
128,600 
99 
99 
134,404 
142,700 
16,000 
24,218 
247,917 
255,163 
100 
72 
188,500 1,309,499 420,568 260,680 
25,925 163,959 1,060,396 922,145 
170,000 
782,698 
4,866,738 
4,721,672 
-2,400 
-2,335 
6,500 
6,567 
4,500 
1,118 
4,900 
12,659 
3,602,873 
3,634,766 
67,906 
11,467 
10,783 
10,783 
49,000 
9,486 
4,234,263 
4,312,192 
12,449 
69,211 
212,821 
34,321 
500 2,500 
996 5,432 
-40,000 
2,236 
4,059,272 
4,091,857 
60,673 
14,504 
35,539 
212,583 
3,090 
2,503 
143 
$ 534,209' 
534,2091 
4,410,5162 
4,410,1122 
77,000 
60,342 
448,8493 
448,849 
2,238,589 
2,231,490 
146,7564 
146,7564 
630,936 
630,908 
72,147,8005 
72,147,8005 
10,833,9406 
10,814,8216 
57,879,8727 
57,875,374 
134,813,3668 
134,765,9538 
508,324 
508,324 
511,2109 
511,2109 
885,723 
839,254 
1,323,775 
1,323,775 
561,51410 
561,51410 
661,738 
660,282 
168,412" 
168,412" 
61,99012 
61,2881

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 3-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
10. Inland Waterway from 
Delaware River to 
Chesapeake Bay, Del. 
and Md. 
11. Manasquan River, 
N. J. 
12. New Jersey Intracoastal 
Waterway 
13. Schuylkill River, 
Pa. 
14. Waterway from Indian 
River Inlet to 
Rehoboth Bay, Del. 
15. Wilmington Harbor, 
Del. 
19. Atlantic City, N.J. 
22. Beltzville Lake, Pa. 
23. Blue Marsh Lake, Pa. 
24. Francis E. Walter 
Dam, Pa. 
25. General Edgar Jadwin 
Dam and Reservoir, 
Pa. 
$14,150,000 
14,036,504 
1,067,000 
1,086,173 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
$9,495,100 
9,647,557 
1,014,670 
1,074,522 
280,800 
313,298 
1,253 
270,741 
268,267 
354 
318,000 264,000 
338,671 45,857 
- 4,000 
- 2,385 
410,000 
72,136 
7,880 
353,194 
$ 3,920,000 
4,182,918 
1,373,868 
1,307,291 
24,634 
60,021 
-3,99518 
1,162 
330,364 
322,954 
-7,374 
485 
84,944 
307,374 
4,966 
6,581 
452,718 
452,718 
150,000 304,815 -391 
150,680 300,248 1,217 
3,925,000 2,830,000 5,500,000 
2,926,455 3,648,386 5,592,256 
237,500 297,000 
239,089 247,251 
68,700 
82,489 
30,000 
26,097 
122,500 
66,959 
22,300 
27,315 
300,000 
226,171 
82,500 
106,017 
141,000 
112,213 
$ 4,867,000 
5,022,988 
1,044,241 
1,092,302 
103,188 
37,617 
1,84918 
14,811 
334,000 
329,322 
769,687 
768,915 
$111,289,691'1 
111,237,54913 
45,993,24114 
45,962,94514 
557,24915 
557,24915 
1,726,32516 
1,722,61016 
555,600 
555,600 
71,54917 
71,549" 
4,748,26219 
4,073,30919 
1,196,581 
1,196,581 
3,334,00720 
3,334,00720 
15,667,557 
15,030,483 
90,90821 
90,90821 
44,022 
23,935 
11,,995544,,77225522 
12,785,56523 
12,419,6272 
1,798,109 
1,796,457 
19,289,631 
19,275,090 
1,639,500 
1,279,668 
11,087,432 
11,087,432 
767,847 
742,603 
4,073,105 
4,073,105 
409,513 
379,846 
144 
75,359 
71,644 
1,048,094 
436,252 
769,513 
132,439 
24,000 
3,913 
482,244 
116,306 
185 
2,905 
4,607,000 
4,779,297 
400,000 
167,843 
134,012 
157,630 
117,983 
123,794

PHILADELPHIA, PA., DISTRICT 
TABLE 3-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
26. Prompton Lake, Pa. New Work 
Approp. $ 118,552 $ - $ -7 $ - $ 4,557,48324 
Cost 150,965 24,630 171 - 4,557,48324 
Maint. 
Approp. 30,000 57,200 49,200 45,297 370,162 
Cost 72,134 35,730 78,225 45,596 367,839 
27. Trexler Lake, Pa. New Work 
Approp. 257,500 103,000 7 914 561,421 
Cost 173,399 107,857 75,757 22,177 560,551 
31. Tocks Island Lake, New Work 
Pa.,N.J., and N.Y. Approp. 1,225,000 3,800,000 2,050,000 3,499,087 12,839,087 
Cost 786,997 1,583,751 3,273,511 4,712,031 12,585,537 
1. Includes $226,497 for new work for previous projects. 
2. Includes $235,786 for maintenance for previous projects. 
3. Excludes $300,000 contributed funds. 
4. Includes $36,000 for new work for previous projects. 
5. Includes $2,489,173 for new work, for previous projects, 
$105,000 for preauthorization studies and minus $142,015 
adjustment (new work) to Delaware River, Philadelphia to Sea 
project from this project under the 1954 modification. 
6. Includes $552,720 for maintenance for previous projects. 
7. Includes $12,976,058 for new work for previous projects 
and $142,015 adjustment from Delaware River, Philadelphia to 
Trenton, N.J. under 1954 modification. 
8. Includes $1,025,409 for maintenance of previous 
projects. 
9. Excludes $10,000 for previous project and $210,000 
contributed funds. 
10. Excludes $60,000 contributed funds. 
11. Entire amount expended on previous project repealed in 
1905. 
12. Excludes $2,000 contributed funds and includes $25,330 
for maintenance for previous projects. 
13. Includes $10,709,755 for new work for previous projects. 
14. Includes $6,903,748 for maintenance for previous 
projects. 
15. Includes $39,000 for new work for previous projects. 
Excludes $300,000 contributed funds expended on new work. 
16. Includes $2,054 for maintenance for previous projects. 
17. Excludes $1,824,940 Navy Department funds and 
$99,000 contributed funds expended for new work. 
18. For Recreation Facilities (Code 710). 
19. Excludes $286,953 Navy Department funds expended for 
maintenance. 
20. Includes $525,000 for previous projects. 
21. In addition $20,000 expended for new work from 
contributed funds. 
22. Includes $402,121 for new work for previous project. 
23. Excludes $60,000 contributed funds expended for 
maintenance. 
24. Includes $63,000 appropriated and $61,551 expended 
under Code 710 Recreation Facilities. 
145

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
ABSECON INLET, N. J. (See Section 1 of Text) 
An inlet entrance channel 20 feet deep. 
A channel 15 feet deep into Clam Creek and a turning basin. 
BARNEGAT INLET, N. J. (See Section 3 of Text) 
An 8-foot depth through inlet to Oyster Creek Channel across 
inner bar, 10-foot depth through outer bar and for jetties. 
A channel of suitable hydraulic characteristics from gorge 
to Oyster Creek Channel, and thence to deep water in bay. 
Maintenance dredging of a channel to connect main inlet 
channel with Barnegat City Harbor. 
COHANSEY RIVER, N. J. (See Section 4 of Text) 
Channel 7 feet deep over entire project. 
Channel 12 feet deep to Glass Street, thence 8 feet deep to 
Commerce Street, with turning basin. 
H.Doc. 375, 67th Cong., 2d sess. 
H.Doc. 504, 79th Cong., 2d sess. 1 
Rivers and Harbors Committee Doc. 
19, 73d Cong., 2d sess. 1 
Rivers and Harbors Committee Doc. 
85, 74th Cong., 2d sess. 1 
H.Doc. 358, 79th Cong., 2d sess. 1 
H.Doc. 645, 59th Cong., 1st sess. 1 
Senate Committee print, 75th 
Cong., 1st sess. 1 
DELAWARE RIVER BETWEEN PHILADELPHIA, PA., AND TRENTON, N.J. 
(See Section 5 of Text) 
A channel 28 feet deep, 300 feet wide between Allegheny Ave., Rivers and Harbors Committee Doc. 
Philadelphia, Pa. and Delair Bridge. 3, 71st Cong., 1st sess. 
Channel 25 feet deep from Delair Bridge to Trenton, N.J., Rivers and Harbors Committee Doc. 
and maintenance of 12-foot channel from upper end of 25-foot 11, 73d Cong., 1st sess. 
project to Penn Central R.R. Bridge at Ferry St., Trenton. 
Auxiliary channel, 20 feet deep east of Burlington Island. Rivers and Harbors Committee Doc. 
66, 74th Cong., 1st sess.1 
A cross channel 8 feet deep, opposite Delanco, N. J. Rivers and Harbors Committee Doc. 
90, 74th Cong., 2d sess. 
Anchorage at mouth of Biles Creek. H.Doc. 679, 79th Cong., 2d sess. 
A channel 40 feet deep and 400 feet wide between Allegheny H.Doc. 358, 83rd Cong., 2d sess.1 
Ave., Philadelphia, Pa., and upstream end of Newbold Island, 
thence 35 feet deep to Trenton Marine Terminal and turning 
basin to 800 feet wide. Relocate channel at railroad bridge 
at Delair and suitably reconstruct bridge. Construct 
necessary bank protection works; and eliminate authorized 
anchorage near mouth of Biles Creek, Pa. 
DELAWARE RIVER, PA., NJ., AND DEL., PHILADELPHIA TO THE SEA 
(See Section 6 of Text) 
Channel 35 feet deep from Allegheny Ave., Philadelphia, Pa., H. Doc. 733, 61st Cong., 2d sess. 
to Delaware Bay. 
Anchorages 35 feet deep at Port Richmond and Mantua Creek, a H. Doc. 304, 71st Cong., 2d sess.1 
30 foot anchorage at Gloucester, N.J., and extend 1,000 foot 
channel in Philadelphia Harbor to Horseshoe Bend. 
An anchorage 35 feet deep at Marcus Hook, Pa. Rivers and Harbors Committee Doc. 
5, 73d Cong., 1st sess. 
A channel 37 feet deep from Philadelphia-Camden Bridge to S. Doc. 159, 75th Cong., 3d sess. 1 
Navy Yard, thence 40 feet deep to deep water in Delaware Bay. 
A 37-foot depth in channel from Allegheny Ave., Philadelphia, H. Doc. 580, 76th Cong., 3d sess. 1 
Pa., to Philadelphia-Camden Bridge and in anchorage at Port 
Richmond. 
A 37-foot depth in and enlargement of anchorages near Mantua H. Doc. 340, 77th Cong., 1st 
Creek and Marcus Hook. sess. 
Maintain enlarged channel opposite Philadelphia Navy Yard. Specified in Act. 
A channel from Allegheny Ave., to Naval Base 40 feet deep, H. Doc. 358, 83d Cong., 2d sess.1 
400 feet wide along west side of channel through Philadelphia 
Harbor and 500 feet wide through Horseshoe Bend. 
Anchorages at Reedy Point, Deepwater Point, Marcus Hook, and H. Doc. 185, 85th Cong.,lst 
Mantua Creek, 40 feet deep and 2,300 feet wide with mean sess. 
lengths of 8,000, 5,200, 13,650 and 11,500 feet respectively. 
146 
TABLE 3-B 
Sept. 22, 1922 
July 24, 1946 
Aug. 30, 1935 
Aug. 26, 1937 
July 24, 1946 
Mar. 2, 1907 
Aug. 26, 1937 
July 3, 1930 
Aug. 30, 19352 
Aug. 30, 19352 
Aug. 26, 1937 
July 24, 1946 
Sept. 3, 1954 
June 25, 1910 
July 3, 1930 
Aug. 30, 19353 
June 20, 19384 
Mar. 2, 19455 
Mar. 2, 19455 
Mar. 2, 19455 
Sept. 3, 1954 
July 3, 1958

TABLE 3-B (Continued) 
PHILADELPHIA, PA., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
INDIAN RIVER INLET AND BAY, DEL. (See Section 7 of Text) 
A 15-foot inlet channel, steel and stone jetties, 6 foot River and Harbors Committee Doc. 
channel from end of inlet channel to deep water in the bay 41, 75th Cong., 1st sess.1 
and authority to modify interior inlet channel. 
A 9 foot channel from inlet to Old Landing, including basin, H. Doc 330, 76th Cong., 1st sess.1 
and 4 foot channel to highway bridge at Millsboro. 
INLAND WATERWAY, REHOBOTH BAY TO DELAWARE BAY, DEL. (See 
Section 8 of Text) 
For a 6-foot depth canal to connect Rehoboth Bay and H. Doc. 823, 60th Cong., 1st 
Delaware Bay. sess. and Rivers and Harbors 
Committee Doc. 51, 61st Cong., 
3rd sess. 
For a 6 foot depth entrance near Lewes, for jetties, for Rivers and Harbors Committee Doc. 
widening the canal from Broadkill River to Lewes, and basin. 56, 75th Cong., 1st sess.1 
For a 10-foot depth from Delaware Bay to Lewes and in basin, H. Doc. 344, 77th Cong., 1st 
and for extending jetties. sess. 
INLAND WATERWAY FROM DELAWARE RIVER TO CHESAPEAKE BAY, DEL. 
Aug. 26, 1937 
Mar. 2, 1945 
July 25, 1912 
Aug. 30, 1935 
Mar. 2, 1945 
Aug. 30, 1935 
Aug. 7, 1939 
Sept. 3, 1954 
July 3, 1930 
Aug. 30, 1935 
Mar. 2, 1945 
Aug. 8, 1917 
July 3, 1930 
July 24, 1946 
H. Doc. 201, 72d Cong., 1st sess. 
and Rivers and Harbors 
Committee Docs. 18 and 24, 73d 
Cong., 2d sess.1 
Public Law 310, 76th Congress, 
1st sess. 
S. Doc. 123, 83d Cong., 2d sess.1 
H. Doc. 482, 70th Cong., 2d sess. 
Senate Committee Doc., 74th Cong. 
1st sess. 
H. Doc. 356, 77th Cong., 1st 
sess. 
H. Doc. 1270, 64th Cong., 1st 
sess. 
Rivers and Harbors Committee Doc. 
40, 71st Cong., 2d sess.1 
H. Doec. 699, 79th Cong., 2d sess.1 
147 
AND MD. (See Section 10 of Text) 
A sea level channel 27 feet deep, 250 feet wide from 
Delaware River to Elk River and 400 feet wide down Elk River 
and Chesapeake Bay to deep water at or near Pooles Island; 
alter existing bridges over canal; enlarge Delaware City 
Branch Channel to 8 feet deep and 50 feet wide, with a basin 
same depth, and revetment of both banks east of Fifth Street; 
enlarge anchorage and mooring basin in Back Creek to 400 feet 
wide, 1,000 feet long, and 12 feet deep; extend jetties at 
Reedy Point; and construct bulkheads. 
Construct a 4-lane high-level fixed highway bridge at or near 
St. Georges. 
A channel135 feet deep and 450 feet wide from Delaware River 
through Elk River and Chesapeake Bay to water of that depth 
in the bay, including a cutoff at Penn Central Railroad 
crossing, with a minimum radius of curvature of 7,000 feet 
at bends; a high level fixed railroad bridge over cutoff; 
high level fixed highway bridge at Reedy Point and Summit; 
and an anchorage in Elk River 35 feet deep and 1,200 feet 
wide, averaging 3,700 feet long. 
MANASQUAN RIVER, N. J. (See Section 11 of Text) 
Channel 8 feet deep and provision of works designed to secure 
channel. 
Widening channel on northerly side. 
Deepening channel to 12 and 14 feet, 10 and 12 foot 
anchorages. 7 
SCHUYLKILL RIVER, PA. (See Section 13 of Text) 
Depths of 35 feet from mouth to Girard Point, thence 30 feet, 
26 feet, and 22 feet to University Avenue Bridge, 
Philadelphia. 
A depth of 30 feet instead of 35 feet between the mouth and 
the conditional restoration and maintenance of the channel 
below Passyunk Ave., by the United States. 
A depth of 33 feet from the channel in Delaware River to 
Passyunk Ave., restoration of the project channel dimensions 
between Passyunk Ave. and University Ave., and full maintenance 
of the entire project.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 3-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
WILMINGTON HARBOR, DEL. (See Section 15 of Text) 
June 3, 1896 Depths of 21, 10, and 7 feet and jetties. H. Doc. 66, 54th Cong., 1st sess. 
Annual Report, 1896, p. 973; 
Annual Report 1897, p. 1250.1 
July 25, 1912 Purchase or construct a dredge and auxiliaries including a H. Doc. 359, 62d Cong., 2d sess. 
wharf and depot, and maintenance of project. 
Sept. 22, 1922 Entrance channel and basin with 25-foot depth and construction H. Doc. 114, 67th Cong.,lst sess. 
Mar. 3, 1925 by local interests of new south jetty. and S. Committee Print, 68th 
Cong., 1st sess. 
July 3, 1930 A 30 foot depth between Delaware River and Lobdell Canal and Rivers and Harbors Committee Doc. 
modification or removal of a portion of north jetty. 20, 71st Cong., 2d sess. 
Aug. 30, 19358 Completion of new south jetty by the United States; subject Rivers and Harbors Committee Doc. 
to provision that city of Wilmington reimburse the United 32, 73d Cong., 2d sess. 
States for cost, without interest, of any part of structure 
that may subsequently be occupied and utilized for city 
activities. 
Oct. 17, 1940 Permit temporary occupancy by city of Wilmington of any part H. Doc. 658, 76th Cong., 3d sess. 
of south jetty for city activities under revocable license, 
provided occupied portion of jetty is properly maintained 
without expense to the United States. 
July 14, 1960 A 35-foot depth between Delaware River ship channel and S. Doc. 88, 86th Cong., 2d sess. 
Lobdell Canal including turning basin of same depth, opposite 
Wilmington Marine Terminal, 200 feet wide, 2,900 feet long 
on north side of channel, and 2,000 feet long on north side 
of basin. 
1. Contains latest published maps. 5. Channel 37 feet deep and 600 feet wide from 
2. Also Public Works Administration, September 6, 1933, Philadelphia-Camden Bridge to Allegheny Avenue, deferred for 
and Emergency Relief Administration, May 28, 1935. restudy. 
3. Also Public Works Administration, September 6, 1933. 6. Extension of jetties considered to be inactive. 
4. Channel 37 feet deep and 600 feet wide from Naval Base 7. The 10 and 12 foot anchorages are considered inactive. 
to Philadelphia-Camden Bridge, deferred for restudy. 8. Also May 28, 1935, under Emergency Relief 
Administration. 
TABLE 3-C TOTAL COSTS FOR EXISTING PROJECT TO JUNE 30, 1970 
See 
Section 
in Text Project Funds New Work Maintenance Rehabilitation Total 
5. Delaware River between Public works $ 2,189,956 - - $ 2,189,956 
Philadelphia, Pa., and Emergency relief 2,636,456 - - 2,636,456 
Trenton, N. J. Regular 64,727,215 $ 10,120,881 - 74,848,096 
Totals $69,553,627 $ 10,120,881 - $ 79,674,508 
6. Delaware River, Pa., N. J., Public works $ 813,046 - - $ 813,046 
and Del., Philadelphia to Regular 44,086,269 $133,000,101 $508,324 177,594,694 
the Sea. Totals $44,899,315 $133,000,101 $508,324 $178,407,740 
148

PHILADELPHIA, PA., DISTRICT 
INLAND WATERWAY FROM DELAWARE RIVER 
TO CHESAPEAKE BAY, DEL. AND MD.: 
OPERATIONS AND RESULTS DURING FISCAL YEAR 
TABLE 3-D (See Section 10 of Text) 
New Work Contracts
Quantity 
Removed 
Type of Work Location (Cu. Yds.) Cost Status 
Relocations: 
Superstructure Reedy Point Bridge - $ 8,941 Final payment 9 Oct 69 
Superstructure Penn Central RR - 26,650 Final payment 18 Sep 69 
Channels: 
Dredging to 35-foot depth: 
Sections 14 and 15, 16 and 
Pt. 17 - 2,232,422 3,780,000 Continued 
Construction of well, Section 3-6 - - 29,976 Completed, 26 Jan 70 
Other Items: 
Disposal Area Summit to State Line - 581,104 Continued 
Spillway Repairs Guthries Area - 6,071 Completed 
Probing - Rock Area Rock Area - 4,493 Continued 
TABLE 3-E RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 16 of Text) 
Project Date Survey Conducted 
Alloway Creek, N. J. April 1970 - June 1970 
Beach Condition Surveys, N. J. July 1969 
Broadkill River, N. J. July 1969 - September 1969 
Harbor of Refuge, Delaware October 1969 - April 1970 
Little River, Delaware September 1969 - February 1970 
Mantua Creek, N. J. April 1970 - June 1970 
149

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 3-F OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last 
Full Report Cost to June 30, 1970 
See Annual 
Project Report For Construction Operation & Maintenance 
Absecon Creek, N.J.1 1969 $ 11,935 $ 163,467 
Alloway Creek, N. J.1 1931 21,396 35,565 
Appoquinimink River, Del. 1931 36,973 41,270 
Big Timber Creek, N. J. 1 1962 58,6652 52,186 
Broadkill River, Del.l 1966 68,228 241,141 
Chester River, Pa.3 1931 6,000 1,139 
Cold Spring Inlet, N. J. 1969 2,013,6214 1,288,688 
Cooper River, N. J. 1962 33,102 377,570 
Delaware River at Camden, N. J. 1963 462,906 329,526 
Delaware River, N.Y., N.J., and Pa., 
at or near mouth of Neversink Rivers 1917 - 
Dennis Creek, N. J.1 1897 4,701 
Double Creek, N. J.1 1912 7,800 6 
Goshen Creek, N. J. 1905 15,359 870 
Harbor of Refuge, Delaware Bay, Del.' 1964 5,162,230 402,454 
Ice Harbor at Marcus Hook, Pa.1 '7 1928 208,964 14,336 
Ice Harbor at New Castle, Del. 1' 7 1898 224,704 
Leipsic River, Del.1 1931 36,956 32,345 
Little Egg Harbor, N. J.1,s _ 8 15,048 
Little River, Del.1 1966 12,016 149,362 
Mantua Creek, N. J. 1966 169,6879 336,388 
Maurice River, N. J. 1948 - 
Channel 8 feet deep, Delaware Bay to mouth10 - - 
Delaware Bay to Millville - 143,98411 132,494 
Mispillion River, Del.12 1965 631,339 608,347 
Murderkill River, Del. 1969 37,630 337,056 
Neshaminy State Park Harbor, Pa. ' 13 1968 128,203 
Oldmans Creek, N. J. 1941 31,188 32,125 
Pepper Creek, Del.1 1965 138,094 
Raccoon Creek, N. J.1 1966 83,66514 316,202 
Rancocas River, N. J. 1942 44,500 13,090 
St. Jones River, Del. 1961 - 
Delaware Bay to Labanon 1' 1s - 207,102 66,093 
Jetties and new entrance at mouthlO 
Salem River, N. J. 1961 - 
Delaware River to fixed bridge16 - 107,63417 287,479 
Penns Neck Bridge to fixed bridge18 - - 
Schuylkill River above Fairmount Dam, Pa.1 1955 4,291,8106 
Smyrna River, Del. 1949 - 
Delaware River to Wharf at Smyrna Landing1 9 - 198,844 197,327 
Wharf at Smyrna Landing to fixed bridgelo0 
- - 
Toms River, N. J. 1950 
Channel 5 ft deep1 - 10,050 33,311 
Channel 12 feet deep' 0 
Tuckerton Creek, N. J. 1968 60,242 393,371 
Woodbury Creek, N. J. 1940 27,09320 56,474 
150

PHILADELPHIA, PA., DISTRICT 
1. Completed. 
2. Excludes $50,000 contributed funds expended for new 
work. 
3. Includes $6,000 new work and $63 maintenance funds 
expended on previous projects. 
4. Includes $1,134,346 for rehabilitation of existing project 
and excludes $50,000 Navy Department and $100,000 
contributed funds. 
5. Abandonment recommended in House Document 467, 
69th Congress, 1st Session. 
6. Maintenance assumed by local interests. 
7. Harbor not now required by commerce. 
8. Last appropriation for project was in 1852. No 
information is at hand relative to work done. 
9. Includes $3,000 for new work for previous projects. 
10. Deferred. 
11. Includes $43,000 new work funds expended on previous 
projects. 
TABLE 3-G OTHER AUTHORIZED BEA 
Project 
Barnegat Light, N. J. 
Cape May City, N. J. 
Long Beach Island, N. J. 
North Wildwood, N. J. 
Ocean City, N. J. 
Rehoboth Beach to Indian River Inlet, Del. 
Stone Harbor, N. J. 
Ventnor, Margate and Longport, N. J. 
12. Includes $148,798 for new work and $61,172 for 
maintenance of previous projects and $253,491 for minor 
rehabilitation for existing project. 
13. Excludes $327,957 contributed funds allotted expended 
for new work. 
14. Excludes $757 new work funds expended on previous 
projects. 
15. Includes $54,590 new work and $28,935 maintenance 
funds expended on previous projects. 
16. Includes $55,809 new work and $48,000 maintenance 
funds expended on previous projects. 
17. Exclusive of $51,825 contributed by local interests. 
18. Deferred. Dredged under previous project to 9 foot 
depth. 
19. Includes $55,085 new work and $22,723 maintenance 
funds expended on previous projects. 
20. Includes $2,950 new work funds expended on previous 
projects. 
CH EROSION CONTROL PROJECTS 
For Last 
Full Report 
See Annual 
Report For 
1964 
1961 
1964 
1961 
1969 
1965 
1961 
1961 
Cost to J':ae 30, 1970 
Construction Operation & Maintenance 
$ 70,908 - 
22,9572 1 
40,665 - 1 
395,8313 1 
326,116 1 
1. Operation and maintenance required by law to be 
assumed by local interests. 
2. Excludes $58,585 Accelerated Public Works funds 
expended for extension to two groins. 
3. Excludes cost of $1,146,325 to local interests and 
$272,766 Federal participation expended under Public Works 
Acceleration Program for extension of five existing groins 
completed 11 May 1964. 
TABLE 3-H BEACH EROSION CONTROL WORK UNDER SPECIAL AUTHORIZATION 1 
(See Section 21 of Text) 
Fiscal Year 
Project Cost 
Broadkill Beach, Sussex County, Del. $9,559 
Lewes, Sussex County, Del. 1,487 
Somers Point, Cape May County, N. J. 159 
South Bowers, Kent County, Del. 1,884 
1. Beach erosion control activities pursuant to Section 103, 
Public Law 87-874 (Preauthorization). 
151 
TABLE 3-F (Continued) OTHER AUTHORIZED NAVIGATION PROJECTS

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 3-I OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last 
Full Report Cost to June 30, 1970 
See Annual 
Project Report For Construction Operation & Maintenance 
Allentown, Lehigh River, Pa. 1961 $1,615,581 - 1 
Aquashicola Reservoir, Pa.2 1963 - 1 
Bethlehem, Pa. 1966 4,520,995 1 
Delaware Coast Protection, Del.2 - 3 - 
Maiden Creek Reservoir, Pa.2 1963 - 1 
Mt. Holly, N. J. 1946 283,655 - 1 
1. Maintenance assumed by local interests as required by act 3. Project authorized during FY 1969 by Section 203 of the 
authorizing project. Flood Control Act of 1968 (PL 90-483; Stat. 731) in accordance 
2. New Project. with Senate Document No. 90, 90th Cong., 2d sess. 
TABLE 3-J FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION1 
(See Section 30 of Text) 
Study Fiscal Year Cost 
East Branch, Delaware River, N. Y. $ 107 
Gibbstown, N. J. 1,654 
Little Mill Creek, Del. 25,710 
Newton Creek, Woodlynne, N. J. 4,628 
Pleasantville, Egg Harbor Township, N. J. 2,500 
Village of Delhi, Delaware County, N. Y. 11,388 
Village of'Walton, Delaware County, N. Y. 20,063 
Wilsey Brook, Wurtsboro, N. Y. 536 
1. Flood control activities pursuant to Section 205, Public 
Law 838, 80th Congress, as amended (preauthorization). 
152

BALTIMORE, MD., DISTRICT* 
This district comprises the watershed of 
Susquehanna River and its tributaries from 
headwaters in south central New York State through 
central Pennsylvania to its mouth in Chesapeake Bay; 
watershed of the Potomac River and its tributaries 
from headwaters in Maryland, eastern West Virginia, 
and northern Virginia to its mouth in Chesapeake Bay; 
District of Columbia; and southwestern portion of 
Delaware. It includes that portion of Chesapeake Bay 
and its tributaries north of Smith Point, Md., on 
western shore of the bay, and includes that portion of 
Maryland between Chesapeake Bay and Atlantic 
Ocean. 
IMPROVEMENTS 
Navigation Page 
1. Baltimore Harbor and Channels, Md. ... 154 
2. Baltimore Harbor, Md., Collection and 
Removal of Drift ............................. 155 
3. Bonum Creek, Va. .................................. 155 
4. Cambridge Harbor, Md ....................... 156 
5. Chester River, Md .............................. 156 
6. Choptank River, Md. ............................ 157 
7. Cuckold Creek, Md. ............................... 157 
8. Cunninghill Cove, Md ....................... 157 
9. Harbor of Baltimore, Md. - Prevention 
of Obstructions and Injurious Deposits 158 
10. Herring Bay and Rockhold Creek, Md. 158 
11. Honga River and Tar Bay (Barren 
Island Gaps), Md. ............................ 158 
12. Island Creek, St. Georges Island, Md. ... 159 
13. Little Wicomico River, Md. ................. 159 
14. Lower Thorofare, Deal Island, Md. ....... 159 
15. Lowes Wharf, Md. ................................. 160 
16. Nanticoke River, Md ............................ 160 
17. Ocean City Harbor and Inlet and 
Sinepuxent Bay, Md ...................... 160 
18. Pocomoke River, Md .......................... 161 
19. Potomac and Anacostia Rivers, D. C., 
Collection and Removal of Drift ........ 161 
20. Potomac River and Tributaries at and 
below Washington, D. C., Elimination 
of Waterchestnut ................................... 162 
21. Rhodes Point to Tylerton, Md................ 162 
22. St. Jeromes Creek, Md. ......................... 162 
23. Susquehanna River at Williamsport, Pa. 163 
24. Tilghman Island Harbor, Md ................. 163 
25. Tred Avon River, Md. ............................. 63 
26. Twitch Cove and Big Thorofare, Md. ... 164 
27. Washington Harbor, D. C. ...................... 164 
28. Wicomico River, Md. .............................. 165 
29. Reconnaissance and Condition Surveys . 166 
30. Other Authorized Navigation Projects ... 166 
* All cost and financial statements for projects are listed at the 
appear at the end of this chapter. 
31. 
32. 
33. 
Navigation (cont.) 
Navigation work under special 
authorization ....................................... 
Beach Erosion Control 
Oxford, Md. ....................................... 
Beach Erosion Control work under 
special authorization ............................ 
Page 
166 
166 
166 
Flood Control 
34. Anacostia River and Tributaries, Flood 
Protection and Navigation 
Improvements, D. C. and Md. ......... 166 
35. Anacostia River and Tributaries, Prince 
Georges County, Md ....................... 167 
36. Bloomington Lake, North Branch, 
Potomac River, Md. and Va. ........... 167 
37. Cumberland, Md., and Ridgeley, W. 
38. 
39. 
40. 
Va. .............................................. 
Lackawanna River Basin, Pa. .............. 
Lake Raystown, Raystown Branch, 
Juniata River, Pa ................................. 
Southern New York Flood Control 
Projects .............................................. 
41. Stillwater Reservoir, Lackawanna River, 
168 
168 
169 
169 
Pa. ....................................... . 173 
42. Susquehanna River Flood Control 
Projects, N. Y. & Pa. ......................... 174 
43. Tyrone, Pa. ............................................. 175 
44. Unadilla, N. Y. ..................................... 175 
45. West Branch of Susquehanna River, Pa. 176 
46. York, Codorus Creek, Pa. ....................... 176 
47. Inspection of Completed Flood Control 
W orks ............................... ..................... 177 
48. Scheduling Flood Control Reservoir 
Operations ..................................... 177 
49. Other Authorized Flood Control Projects 177 
50. Flood Control Work under Special 
Authorization ..................................... 177 
end of this chapter. All other tables are referenced in text and also 
153

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
General Investigations Page 
Surveys ..................................... 177 
Collection and Study of Basic Data ....... 177 
53. 
Miscellaneous Activities Page 
Maintenance, Operation and Capital 
Outlay of the Washington Aqueduct .. 177 
NAVIGATION 
1. BALTIMORE HARBOR AND 
CHANNELS, MD. 
Location. Baltimore Harbor is at head of navigable 
portion of Patapsco River about 12 miles from 
Chesapeake Bay. River rises near town of Westminster 
in Carroll County, Md., and flows generally southeast 
for about 65 miles to enter Chesapeake Bay. (See Coast 
and Geodetic Survey Chart 549.) 
Previous projects. For details see page 274 of Annual 
Report for 1963. 
Existing project. Provides for; (a) A uniform main 
channel 42 feet deep between Cape Charles, Va., and 
Fort McHenry, Baltimore, Md., with dimensions as 
follows; 42 feet deep and 1,000 feet wide at entrance to 
Chesapeake Bay near Cape Henry, 42 feet deep and 1, 
000 feet wide between the curves of 42-foot depth in 
Chesapeake Bay opposite York Spit, 42 feet deep and 
800 feet wide between the curves of 42-foot depth in 
Chesapeake Bay through shoal opposite 
Rappahannock Spit, 42 feet deep and 800 feet wide 
from that depth in Chesapeake Bay to Fort McHenry 
on the Patapsco River, about 175 miles above mouth of 
Chesapeake Bay, with widening at bends and Craighill 
entrance; (b) branch channels with dimensions as 
follows; 42 feet deep and 600 feet wide from main 
channel about 2.2 miles to head of Curtis Bay, thence 
35 feet deep and 200 feet wide in Curtis Creek to a 
point in the creek about 750 feet below Pennington 
Avenue Bridge, thence 22 feet deep and generally 200 
feet wide from 22-foot depth curve immediately below 
Pennington Avenue Bridge to and along marginal 
wharf of Ordnance Depot, a basin 18 feet deep over an 
irregular area of about 3 acres at the head and adjacent 
to 22-foot depth channel, a basin 15 feet deep and 
generally 450 feet wide from head of 22-foot depth 
channel to upper end of marginal wharf, and a channel 
22 feet deep and 200 feet wide from 22-foot depth curve 
south of Baltimore & Ohio Railroad bridge about 2, 
800 feet to vicinity of Arundel Cove, thence 100 feet 
wide in Arundel Cove, for about 2,100 feet, with an 
anchorage basin about 700 feet square adjacent to 
channel southwesterly of Coast Guard wharf; and 42 
feet deep and 600 feet wide from main channel at Fort 
McHenry to private channel leading to Port 
Covington, thence 35 feet deep and 150 feet wide to 
Ferry Bar, and thence 27 feet deep and 150 feet wide to 
Hanover Street Bridge, a total distance of about 2.4 
miles; (c) widening angle between Fort McHenry and 
Ferry Bar sections; (d) connecting channel 35 feet deep 
and 600 feet wide from Cutoff-Brewerton angle in 
main channel to 35-foot depth curve in approach 
channel to Chesapeake and Delaware Canal on east 
side of Chesapeake Bay and for three disjointed 
sections of channels of same depth and width in 
Chesapeake Bay leading to Chesapeake and Delaware 
Canal; (e) following anchorages; Fort McHenry, 3,500 
feet long, 400 feet wide, and 35 feet deep; Riverview 
No. 1, 4,500 feet long, 1,500 feet wide, and 35 feet deep; 
Riverview No. 2, 2,400 feet long, 1,200 feet wide, and 
30 feet deep; Quarantine, 3,500 feet long, 600 feet 
wide, and 35 feet deep; and (f) it is further provided 
that as rapidly as city of Baltimore or other responsible 
agency at its own expense, provides 35- or 39-foot depth 
in Northwest Branch (inner harbor) the United States 
shall take over maintenance of that depth (the United 
States maintains a channel 35 feet deep, varying in 
width from 550 to 1,200 feet and 5,100 feet long from 
Fort McHenry to and along southwest side of inner 
harbor and a channel generally 950 feet wide and 5, 
000 feet long along easterly side of inner harbor). 
Depths refer to mean low water. Mean range of tide is 
about 2.8 feet at Cape Henry, about 2.3 feet at York 
Spit, about 1.5 feet at Rappahannock Shoal and 1.1 
feet at Baltimore. 
Estimated cost (1970) for new work, exclusive of 
amounts expended on previous projects, is $31,230,000 
of which $8,330,000 is for completed work through the 
River and Harbor Act of 1945 (including work in York 
Spit Channel through fiscal year 1941) and $22,900, 
000 for work authorized by the River and Harbor Act 
of 1958 of which $7,341,660 and $15,558,340 are for 
work under jurisdiction of Norfolk and Baltimore 
Districts, respectively. 
Widening 35-foot depth from Port Covington 
channel from 150 to 400 feet to Ferry Bar, widening 27- 
foot depth channel from 150 to 250 feet to Hanover 
Street Bridge, and providing a channel 27 feet deep by 
250 feet wide to Western Maryland Railway bridge 
with an anchorage and turning basin at upper end is 
considered inactive and excluded from fore-going 
estimate. Estimated cost (1954) of this portion is $1, 
603,000. 
Local cooperation. Fully complied with for 
improvements authorized under River and Harbor Act 
of 1945 and prior acts. River and Harbor Act of 1958 
requires local interests furnish lands, rights-of-way, and 
spoil-disposal areas for construction and future 
maintenance, hold the United States free from 
damages, and provide and maintain all necessary 
alterations in sewer, water supply, drainage, and other 
utilities. Local interests gave formal assurance that 
terms will be complied with. 
154 
51. 
52.

BALTIMORE, MD., DISTRICT 
Terminal facilities. Port of Baltimore consists of 46 
miles of waterfront, 30 miles of which are developed. 
There are 271 piers, wharves, and docks in Baltimore 
Harbor with depths in berthing areas ranging up to 40 
feet at mean low water. Most deep-draft shipping, 
other than that handled at wharves of the numerous 
industrial plants, is concentrated at modern ocean 
terminals operated by three truckline railroads, the 
Baltimore & Ohio, Pennsylvania, and Western 
Maryland; and by a terminal railroad, the Canton. All 
of these terminals are equipped with depressed or 
apron tracks permitting transfer of cargoes directly 
between ship and car. Facilities also are provided at 
rail terminals for receipt and delivery of motor truck 
freight. Railroads, with tracks extending to all portions 
of port area, have voluntarily granted 5 days free time 
on piers to truck freight on both imports and exports. 
Supporting yards for railroad terminals can 
accommodate 11,800 cars and combined ground 
storage capacity is 32,250 cars. Major facilities in port 
include 3 grain elevators with a capacity of 
approximately 13 million bushels, 15 modern ore 
cranes with a rated unloading capacity of more than 
11,000 tons per hour, 30 public general-merchandise 
warehouses, 3 modern cold-storage facilities, 4 coal 
piers, 28 oilhandling and bunkering terminals, 2 
refining plants, and 12 shipbuilding and ship repair 
yards. Shipbuilding and repair yards are equipped 
with facilities for handling every type of vessel 
construction, conversion, and repair. Facilities include 
11 shipways ranging from 150 to 650 feet long, 7 
floating drydocks with lifting capacities of from 6,000 
to 22,000 tons, 2 graving docks and 15 marine railways 
in addition to numerous outfitting piers and shops. All 
piers are accessible by adequate paved highways. A 
municipally owned beltline railway some 3 miles long 
encircles upper end of inner harbor and connects tracks 
of Baltimore & Ohio, Pennsylvania, and Western 
Maryland Railroads. Latest description of terminal 
facilities is in "Port Series No. 10 (revised 1966)" on 
Port of Baltimore, Md., issued by Board of Engineers 
for Rivers and Harbors. 
Operations and results during fiscal year. New Work 
Baltimore District: Preparation of contract plans and 
specifications for Connecting Channel to C & D Canal 
was continued throughout the fiscal year. Costs were 
$9,451. 
New Work, Norfolk District: None. 
Maintenance, Baltimore District: Dredging to 
restore project dimensions in the Craighill-Cutoff 
Angle; Cutoff-Brewerton Angle; and dredging of the 
Connecting Channel to the C & D Canal to a depth of 
27 feet by the U'S' hopper dredge Goethals began on 
September 30, 1969 and was completed on October 30, 
1969. Removed 868,500 cubic yards of material, place 
measure and deposited overboard in approved spoil 
disposal areas. Condition surveys and estimates of 
yardages of shoal material in reaches of the main 
channel were made by hired labor. Costs were $322, 
113. 
Maintenance, Norfolk District: Dredging to provide 
project dimensions in portions of the Cape Henry 
Channel by the U.S. hopper dredge. Goethals began on 
October 30, 1969 and was completed on December 31, 
1969. Removed 538,750 cubic yards of material, place 
measure and deposited overboard in approved spoil 
disposal areas. Costs were $537,186. 
Condition at end of fiscal year. Project as authorized by 
1945 River and Harbor Act and prior acts was 
completed in March 1954 except for inactive portion. 
Norfolk District undertook jurisdiction of the channel 
in York Spit section in fiscal year 1942 and the channels 
in Cape Henry and Rappahannock Shoal sections in 
fiscal year 1961. Norfolk District portion of the project 
was completed in March 1967. 
Baltimore District portion of the project authorized 
by 1958 River and Harbor Act is 79 percent complete. 
Work remaining to be done is dredging the Connecting 
Channel to the C & D Canal and the remaining width 
of the approaches thereto. 
Total costs for existing project (including York Spit 
Channel before fiscal year 1942) were $42,452,998 of 
which $28,630,554 was for new work and $13,822,444 
for maintenance. 
2. BALTIMORE HARBOR, MD., 
COLLECTION AND REMOVAL OF 
DRIFT 
Location. Project applies to Baltimore Harbor, Md., 
and its tributaries. 
Existing project. Provides for collection and removal of 
drift from Baltimore Harbor and its tributary waters, 
and authorizes Secretary of the Army to allot such 
amounts as may be necessary for work from 
appropriations for maintenance and improvement of 
existing river and harbor works or other available 
appropriations, and that this work shall be carried as a 
separate and distinct project. It is wholly a work of 
maintenance. Purpose of work is to afford relief from 
variable conditions of obstruction. 
Local cooperation. None required. 
Terminal facilities. See report for Baltimore Harbor 
and Channels, Md. 
Operations and results during fiscal year. Maintenance 
operations, by hired labor, consisted of collection and 
disposal of 31,590 cubic feet of driftwood, ranging from 
small blocks up to timbers of large dimensions. 
Condition at end of fiscal year. Existing project is one of 
continuous maintenance. Navigation has been made 
safer by continued patrol of the harbor and removal of 
drift material which began in July 1949. 
3. BONUM CREEK, VA. 
Location. A tidal estuary of the Potomac River, enters 
its right bank 18 miles upstream from Chesapeake Bay. 
155

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
It is in Westmoreland County, Va., about 90 miles 
southeasterly of Washington, D'C' (See Coast and 
Geodetic Survey Chart 558.) 
Existing project. Provides for a channel 60 feet wide 
and 6 feet deep from that depth in the Potomac River 
to and including an anchorage basin at the same depth 
160 feet wide and 200 feet long in front of the proposed 
public landing to be provided by local interests. Project 
also provides for the entrance channel to be protected 
on both sides by jetties, the north jetty being about 700 
feet long and the south jetty being about 300 feet long. 
Cost of new work for completed project was $205,998 
for construction, of which $202,000 was for the Federal 
cost, exclusive of aids to navigation and 
preauthorization studies and $3,998 was the non- 
Federal contribution. 
Local cooperation. Local interest must furnish lands, 
and rights-of-way for new work and future 
maintenance; hold the United States free from 
damages; build and maintain a suitable public landing 
with adequate approaches thereto; make alterations, 
relocations, and removals as required of utility 
facilities, and wrecks and stakes; establish a competent 
public body to regulate the harbor facilities; and make 
a lump sum cash contribution of 2 percent of the first 
cost of general navigation facilities. Assurances of local 
cooperation were accepted on January 11, 1967. 
Terminal facilities. Several small privately owned piers 
or wharves are available on Bonum Creek. Local 
interests constructed an oyster packing house during 
fiscal year 1970 and are preparing to construct a public 
landing. 
Operations and results during fiscal year. A contract for 
maintenance dredging of the channel was awarded 
June 30, 1970. 
Condition at end of fiscal year. The project was 
completed on July 3, 1968. 
4. CAMBRIDGE HARBOR, MD. 
Location. This harbor is a tidal estuary on the south 
side of Choptank River about 18 miles above its mouth. 
It is approximately 70 miles southeast of Baltimore 
Harbor. (See U'S' Coast and Geodetic Survey Chart 
No. 1225.) 
Previous projects. The original project was adopted by 
the River and Harbor Act approved March 3, 1871, 
and was modified by the acts of August 11, 1888, and 
June 13, 1902. For further details see page 1789 of 
Annual Report for 1915, page 424 of Annual Report 
for 1924, and page 373 of Annual Report for 1938. 
Existing project. This provides for a channel 150 feet 
wide and 14 feet deep at mean low water from that 
depth in Choptank River to the Market Street Bridge 
over Cambridge Creek, thence 100 feet wide and 14 
feet deep to the head of the harbor, with a turning basin 
of the same depth at the head of the channel; an 
anchorage basin 10 feet deep, 400 feet long and 175 feet 
wide on the west side of the channel and a second basin 
of the same depth 225 feet long and 200 feet wide on the 
east side of the channel below the bridge; and a 
channel 60 feet wide and 7 feet deep from that depth in 
Choptank River to the municipal boat basin north of 
the harbor entrance. The mean range of tide is about 
1.7 feet. The cost of new work for the completed project 
was $134,653. 
Local cooperation. Fully complied with except that 
local interests are to furnish spoil disposal areas as 
needed for future maintenance. 
Terminal facilities. The water front of Cambridge is 
generally built of solid bulkhead wharves and pile and 
timber piers, only a few of which have mechanical 
freight-handling facilities. With the exception of a 
municipally owned terminal which is open to the 
public, the wharves are privately owned. There are 
town marine railways with boat-repair shops, five oil 
and gasoline terminals, two large fertilizer companies 
and one large packing house located on the shores of 
Cambridge Creek. The facilities are generally 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Hydrographic surveys and plans by contract began 
January 5, 1970 and were completed February 27, 
1970. (Work has been deferred due to unavailability of 
acceptable spoil disposal areas.) 
Condition at end of fiscal year. The active portion is 
complete except for the 7-foot depth channel in 
Choptank River to the municipal boat basin which is 
adequate for present needs. Total costs of the existing 
project were $151,558, of which $134,653 was for new 
work and $16,905 was for maintenance. 
5. CHESTER RIVER, MD. 
Location. Rises in Kent County, Del., flows 50 miles 
generally southwesterly and empties into Chesapeake 
Bay. Kent Island Narrows is a passage connecting 
Chester River and Eastern Bay. Wells Cove is an 
indentation on easterly side of Kent Island Narrows 
about 0.4 mile south of highway bridge crossing the 
Narrows. (See Coast and Geodetic Survey Charts 548 
and 1226.) 
Previous project. For details see page 262 of Annual 
Report for 1960. 
Existing project. Provides for a channel 6 feet deep at 
mean low water and 60 feet wide from Crumpton to 
Jones Landing, section included in project is about 5.5 
miles long, lower end of the section being about 37 
miles above mouth of river; for a channel 7 feet deep at 
mean low water and 75 feet wide from Chester River to 
Eastern Bay through Kent Island Narrows; and a 
channel 7 feet deep at mean low water and 75 feet 
wide, extending from 7-foot deep curve in Kent Island 
Narrows 800 feet into Wells Cove with a basin of same 
depth and 300 feet square at head of Channel. Mean 
range of tide is 2.4 feet. Cost of new work for completed 
project was $32,454, exclusive of amounts expended on 
previous projects. Widening 7-foot deep channel from 
156

BALTIMORE, MD., DISTRICT 
75 to 100 feet from Chester River to Eastern Bay 
through Kent Island Narrows is considered inactive 
and excluded from foregoing estimate. 
Local cooperation. Fully complied with except local 
interests are to furnish spoil disposal areas for future 
maintenance of Wells Cove section of project. 
Terminal facilities. There are two bulkhead wharves on 
Chester River section. Facilities on the Kent Island 
Narrows section of the existing project consist of about 
7,500 linear feet of timber pile bulkheaded wharf. 
About 1,350 linear feet of the wharf is owned and 
operated by the Queen Anne's County; the remainder 
is privately owned. The privately-owned bulkheaded 
wharf is operated mostly by the 7 marinas located on 
the narrows with the remainder being owned and 
operated by the seafood packing houses in the area. In 
addition to the slips of the marinas, there are marine 
railways, launching ramps, and travel-lifts. All of these 
facilities are in good condition and are located adjacent 
to the proposed improvements. In Wells Cove there is a 
small wharf, a small marine railway, and a public 
landing. All facilities are privately owned except the 
public landing on Wells Cove. Facilities are considered 
adequate for existing commerce.. 
Operations and results during fiscal year. A contract for 
maintenance dredging of the channel 4 feet by 60 feet 
from Crumpton to Jones Landing and 7 feet by 75 feet 
in Kent Island Narrows was awarded June 30, 1970. 
Condition at end of fiscal year. Active portion of existing 
project was completed in 1950. Total costs of existing 
project were $282,382, of which $32,454 was for new 
work and $249,928 for maintenance. 
6. CHOPTANK RIVER, MD. 
Location. Rises in Delaware, below Dover, and flows 
in a generally southwesterly direction to Cambridge, 
Md., where it turns northwest and empties into 
Chesapeake Bay south of Tilghman Island, Md. Head 
of navigation is at Greensboro, Md., about 60 miles 
above mouth of river. Total length of river is about 70 
miles. (See Coast and Geodetic Survey Chart No. 
1225.) 
Existing project. Provides for channel 75 feet wide and 
8 feet deep at mean low water from Denton to 
Greensboro, length of section included in project is 
about 8 miles, lower end of section being about 46 miles 
above mouth of river, and for a channel 12 feet deep 
and 100 feet wide in the Choptank River from a point 
opposite Watts Creek to Denton. Mean range of tide is 
about 2.2 feet, and extreme tidal range is 4.6 feet. 
Estimated cost (1970) for new work is $234,296. 
Local cooperation. Local interests must furnish lands 
and rights-of-way for new work and future 
maintenance; provide suitable spoil disposal areas 
including retaining dike, bulkheads, and 
embankments or the costs of such retaining works; hold 
the United States free from damages; make alterations, 
relocations, and removals as required of utility 
451-584 0-72-11 
facilities; execute an assurance of compliance in 
accordance with the Civil Rights Act of 1964; and 
assume full project cost in excess of $500,000. There is 
no local cooperation required for the portion of project 
above Denton. 
Operations and results during fiscal year. New work: 
Negotiations with local interests concerning the terms 
of local cooperation continued. Maintenance: A 
project reconnaissance and condition survey was made, 
by hired labor, at a cost of $2,110. 
Condition at end of fiscal year. Existing project is about 
40% complete. Work remaining is deepening of 
channel from 8 feet to 12 feet in the reach from Watts 
Creek to Denton. 
7. CUCKOLD CREEK, MD. 
Location. Cuckold Creek is a tidal estuary on left bank 
of Potomac River, 40 miles upstream from mouth of 
River at Chesapeake Bay and 70 miles downstream 
from Washington, D. C. 
Existing project. Provides for a channel, 60 feet wide 
and 6 feet deep, from that depth in Potomac River to 
deep water in Cuckold Creek. Estimated Federal cost 
of new work is $30,000 of which $15,000 are Federal 
costs and $15,000 are non-Federal costs. 
Local cooperation. Local interests must furnish all 
lands, easements and rights-of-way for new work and 
maintenance; hold the United States free from 
damages; build and maintain a suitable public landing 
with adequate approaches thereto; make necessary 
alterations and relocations; establish a competent and 
properly constituted public body to regulate the use of 
the harbor facilities; make a lump sum cash 
contribution of 50 percent of the first cost of providing 
the channel and basin; and assume full responsibility 
for all project costs in excess of $500,000. Assurances of 
local cooperation were accepted on January 3, 1968. 
Terminal facilities. There are numerous private piers 
on Cuckold Creek. Local interests will construct a 
public landing and approach road thereto in 
accordance with the terms of local cooperation as a 
part of project development. 
Operations and results during fiscal year. New work: 
Preparation of plans and specifications, by hired labor, 
has been deferred pending receipt of information from 
the State of Maryland. 
Condition at end of fiscal year. Preparation of plans and 
specifications are 95 percent complete. Work 
remaining is completion of plans and specifications and 
construction of project. 
8. CUNNINGHILL COVE, MD. 
Location. Cunninghill Cove, a tidal indentation on 
the right bank of the Gunpowder River, is located 
south of Harewood and east of Chase, Baltimore 
County, Maryland. (See Coast and Geodetic Survey 
Chart 1226.) 
Existing project. Provides for an access channel, 6 feet 
deep and varying in width from 100 to 200 feet, from 
57

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
that depth in the Gunpowder River to the State's 
marina in Cunninghill Cove. Estimated Federal cost of 
new work is $57,500. 
Local cooperation. Local interests must; provide 
without cost to the United States, upon the request of 
the Chief of Engineers, all lands, easements, and rightsof-
way required for aids to navigation, for construction, 
and subsequent maintenance of the project, including 
suitable areas determined by the Chief of Engineers to 
be required in the general public interest for the initial 
and subsequent disposal of spoil and also retaining 
dikes, bulkheads, and embankments therefor, or the 
costs of such works; hold and save the United States 
free from claims for all damages that may result from 
the construction and maintenance of the project; 
provide and maintain at: local expense, a public 
landing or wharf, an access road, a launching ramp, 
and parking area open to all on equal terms in 
accordance with plans approved by the Chief of 
Engineers; accomplish, without cost to the United 
States, alterations, and relocations, as required, in 
sewer, water supply, drainage, and other utility 
facilities; establish a competent and properly 
constituted public body empowered to regulate the use, 
growth and free development of the harbor facilities 
with the understanding that said facilities will be open 
to all on equal terms; assume responsibility for all costs 
in excess of the $500,000 Federal limitation set by law 
and make a lump sum cash contribution of 50 percent 
of the first cost of providing the channel. 
Terminal facilities. There are numerous private piers 
on the Gunpowder River in the vicinity of Cunninghill 
Cove. The state will construct a public marina in 
accordance with the terms of local cooperation as part 
of project development. 
Operations and results during fiscalyear. None. 
Condition at end of fiscal year. Construction has not 
started. Work is being deferred pending development 
of marina facilities by the state. 
9. HARBOR OF BALTIMORE, MD. - 
PREVENTION OF OBSTRUCTIONS 
AND INJURIOUS DEPOSITS 
Location. Project applies to tidal waters of the harbor 
of Baltimore and its adjacent and tributary waters, and 
all tidal waters of Chesapeake Bay and its tributaries 
within State of Maryland. 
Existing project. Continuous patrol and inspection of 
Baltimore Harbor, Chesapeake Bay, and its tributaries 
to prevent and detect violations, and issuances of 
permits for transportation and deposition of waste 
materials in navigable waters as required. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance 
operations, by supervisor of Harbor of Baltimore, 
included 5,209 inspections; 10 pollutions prevented as 
a result of timely inspections; 1,200 copies of Federal 
laws distributed to shipping and waterfront industrial 
interests, general public, boatyards, and marinas; 111 
detailed investigations of violations of pollution laws; 4, 
341 vessels observed; 21 vessels and shore installations 
libeled for illegal disposal of oil or debris; 6 cases closed, 
with payment of fines; 5 cases investigated and 
forwarded to Maryland State Water Pollution Control 
Commission for action; and 16 inspections disclosing 
potential sources of pollution with remedial action 
ordered. 
Condition at end of fiscal year. Work under existing 
project began in July 1959 and is one of continuing 
operation and maintenance. 
10. HERRING BAY AND ROCKHOLD 
CREEK, MD. 
Location. Herring Bay is a wide-mouthed indentation 
on the west side of Chesapeake Bay about 20 miles 
below Annapolis, Md. It is about 3 miles long from 
north to south and penetrates the shore for a depth of 
about 1 mile. Rockhold Creek, which is about 2.5 miles 
long, is an estuary which extends northward from the 
northerly end of Herring Bay. (See Coast and Geodetic 
Survey Chart No. 1225.) 
Existing project. Provides for channel 7 feet deep and 
60 feet wide from 7-foot contour in Herring Bay to 
vicinity of county wharf on Rockhold Creek, with 
turning basin of same depth, 100 feet wide and 150 feet 
long at head of channel, and a stone break-water 
approximately 900 feet long east of entrance channel. 
Mean range of tide is about 1.5 feet and extreme tidal 
range about 4 feet. The Federal cost of new work for 
completed project was $50,591. 
Local cooperation. Fully complied with except local 
interests are to furnish spoil disposal areas for future 
maintenance as needed. 
Terminal facilities. Consist of a public wharf on 
Rockhold Creek about 600 feet below the county 
bridge, open to all, together with a few private landing 
stages. No freight-handling devices are installed on any 
of the wharves which are considered adequate for 
existing commerce. 
Operations and results during fiscal year. A contract for 
maintenance dredging of channel began July 28, 1969 
and was completed July 30, 1969. A total of 17,495 
cubic yards of material, place measure, was removed 
and deposited ashore in authorized spoil disposal areas. 
Condition at end of fiscal year. Project was completed in 
March 1940. Maintenance dredging by contract to 
restore project to authorized dimensions was completed 
during the fiscal year. 
11. HONGA RIVER & TAR BAY (BARREN 
ISLAND GAPS), MD. 
Location. Honga River is a tidal estuary of 
Chesapeake Bay and penetrates Dorchester County on 
Eastern Shore of Maryland between Hooper Islands 
and the mainland; Tar Bay lies between Barren Island 
and the mainland and Hooper Islands. Fishing Creek 
connects Tar Bay and Honga River, Back Creek is a 
158

BALTIMORE, MD., DISTRICT 
branch, of Honga River extending into Hooper Islands, 
the mouth is about 2 miles south of Fishing Creek. (See 
Coast and Geodetic Survey Chart 1224.) 
Existing project. Provides for a channel 60 feet wide 
and 7 feet deep at mean low water from 7-foot contour 
in Chesapeake Bay, through Tar Bay and Fishing 
Creek to 7-foot contour in Honga River, 25,300 feet 
long; and a channel in Back Creek 7 feet deep and 60 
feet wide from 7-foot depth curve in Honga River to a 
point near head of Back Creek with a turning basin of 
same depth 150 feet long and 200 feet wide at head of 
channel, about 5,500 feet long. Mean range of tide is 
about 1.4 feet. Federal cost of new work for completed 
project was $66,119. 
Local cooperation. Fully complied with except that 
local interests are to furnish spoil disposal areas for 
future maintenance as needed. 
Terminal facilities. Numerous small private wharves 
are scattered along Fishing Creek and Back Creek. A 
public wharf is on Fishing Creek. A public wharf, 4 
oyster houses, and a marine railway are on Back Creek. 
Facilities are adequate for existing and reasonably 
prospective commerce. 
Operations and results during fiscal year. Maintenance 
dredging, by contract, began July 22, 1969 and was 
completed July 25, 1969. A total of 17,765 cubic yards 
of material, place measure, was removed and deposited 
in authorized spoil disposal areas. 
Condition at end of fiscal year. Project is complete. The 
channel from Chesapeake Bay, through Tar Bay and 
Fishing Creek to Honga River was completed in 
November 1935 and the channel and turning basin in 
Back Creek was completed in April 1956. Maintenance 
dredging by contract to restore the channel to 
authorized dimensions was completed during the fiscal 
year. 
12. ISLAND CREEK, ST. GEORGES 
ISLAND, MD. 
Location. Island Creek in St. Marys County, Md., is a 
tidal estuary three-fourths of a mile long, flowing in a 
southeasterly direction and entering the right bank of 
St. Marys River at its junction with the Potomac River, 
11 miles upstream of the Chesapeake Bay and 97 miles 
downstream from Washington, D. C. It lies entirely 
within the lower half of St. Georges Island. (See Coast 
and Geodetic Survey Chart No. 557.) 
Existing project. Provides for a channel 5 feet deep, 50 
feet wide, and 2,000 feet long from the St. Marys River 
through the entrance to Island Creek and a turning 
basin 5 feet deep, 200 feet wide, and 500 feet long 
within the creek. The plane of reference is mean low 
water. The tidal ranges are; Mean, 1.5 feet; irregular, 
2.5 feet; and extreme, approximately 7 feet. Costs of 
Federal new work, for the completed project were $6, 
230. 
Local cooperation. Fully complied with except local 
interests are to furnish spoil disposal areas for future 
maintenance as needed. 
Terminal facilities. On Island Creek there are five 
small private landings or stagings which are considered 
adequate for present commerce. 
Operations and results during fiscal year. A contract for 
maintenance dredging of channel was awarded June 
30, 1970. 
Condition at end of fiscal year. The existing project was 
completed in May 1956. 
13. LITTLE WICOMICO RIVER, VA. 
Location. A tidal estuary 6 miles long in 
Northumberland County, Va., flowing southeasterly to 
Potomac River, which it enters on right bank one-half 
mile upstream of its mouth and about 108 miles 
downstream from Washington, D. C. (See Coast and 
Geodetic Survey Chart 557.) 
Existing project. A channel 8 feet deep, 150 feet wide, 
and 4,800 feet long, extending from deep water in 
Potomac River to deep water in Little Wicomico 
River; two stone jetties extending to 8-foot contour in 
Potomac River; and bulkhead walls from inner ends 
thereof extending sufficiently into Little Wicomico 
River to stabilize the dredged inner Channel. Plane of 
reference is mean low water. Tidal ranges in Potomac 
River at entrance are; Mean 1.2 feet; irregular, 2.5 
feet; and extreme, about 7 feet. Mean tidal range 
within the river is about 1 foot. Federal cost of new 
work for completed project was $81,885, exclusive of 
$5,000 contributed by local interests. 
Local cooperation. Fully complied with. 
Terminal facilities. Two wharves open to the public 
and numerous small wharves and stagings for private 
use, an oyster shucking and packing plant, and a 
marine railway and boat-building yard. Facilities are 
considered adequate for present commerce. 
Operations and results during fiscal year. Maintenance 
dredging, by contract, to restore channel to authorized 
dimensions began July 17, 1969 and was completed on 
July 20, 1969. A total of 10,700 cubic yards of material, 
place measure, was removed and deposited ashore in 
authorized spoil disposal areas. A contract for the 
repair of 357 linear feet of timber bulkhead was 
awarded June 30, 1970. 
Condition at end of fiscal year. Project was completed in 
December 1937. 
14. LOWER THOROFARE, DEAL ISLAND, 
MD. 
Location. This is a tidal waterway, about 1.5 miles 
long and from one-eigth to one-half mile wide, 
branching off from Tangier Sound between Deal 
Island and Little Deal Island, Md. It is about 12 miles 
north of Crisfield Harbor, Md. (See Coast and 
Geodetic Survey Chart No. 78.) 
159

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Previous project. The original project was dated March 
3, 1881. For further details see page 1790 of Annual 
Report for 1915. 
Existing project. Provides for a channel 60 feet wide 
and 7 feet deep from that depth in Tangier Sound to 
and including a mooring basin of the same depth, 100 
feet wide and 300 feet long, in the marsh at the head of 
the cove at Wenona. The cost for new work for the 
completed project was $39,658, exclusive of amounts 
expended under previous projects. 
Local cooperation. Fully complied with except local 
interests are required to furnish spoil disposal areas for 
future maintenance as needed. 
Terminal facilities. There are three packing-house 
wharves and a small marine railway above the head of 
the project channel at Wenona. The facilities are 
privately owned but are open to the public for 
transaction of business with the owners. Present 
facilities are adequate for existing commerce. Sufficient 
areas are available for the construction of additional 
terminals when and as required. 
Operations and results during fiscal year. A contract for 
maintenance dredging of channel and basin was 
awarded June 30, 1970. 
Condition at end of fiscal year. The existing project was 
completed in July 1950. The total costs for the existing 
project were $91,872, of which $39,658 was for new 
work and $52,214 was for maintenance. 
15. LOWES WHARF, MD. 
Location. Lowes Wharf is in Ferry Cove, also known 
as Haddaway Cove, a small indentation on the eastern 
shore of Chesapeake Bay about 6 miles north of the 
Choptank River and 13 miles west of Easton, Md. (See 
Coast and Geodetic Survey Chart No. 1225.) 
Existing project. Provides for a channel 60 feet wide 
and 7 feet deep at mean low water from the 7-foot 
depth curve in Ferry Cove to and including a basin of 
the same depth, 200 feet wide and 300 feet long on the 
south side of Lowes Wharf. The mean tidal range is 1.4 
feet; however, greater fluctuations frequently result 
from prolonged or high winds. The cost of new work for 
the completed project was $21,000. 
Local cooperation. Fully complied with except that 
local interests are to furnish spoil disposal areas for 
future maintenance as needed. 
Terminal facilities. Lowes Wharf, a solid-fill pier, with 
a seafood house located on the outer end, is the only 
terminal facility in Ferry Cove. The pier is public and 
is open to watermen at all times. 
Operations and results during fiscal year. A contract for 
maintenance dredging of channel and basin was 
awardedJune 30, 1970. 
Condition at end of fiscal year. Project was completed 
July 2, 1957. 
16. NANTICOKE RIVER, MD. 
Location. The Nanticoke River flows in a 
southwesterly direction to Tangier Sound, Chesapeake 
Bay, and is about 50 miles long. The town of 
Nanticoke, Md., is on the east side of the river, about 3 
miles above the mouth, just north of Roaring Point. 
(See Coast and Geodetic Survey Chart No. 567.) 
Existing project. Provides for a small-boat harbor 7 feet 
deep, 120 feet wide, and 400 feet long in the marsh at 
Nanticoke, with an entrance channel of the same depth 
and 60 feet wide, protected by twin stone jetties in the 
river, the north jetty being about 870 feet long and the 
south jetty being about 770 feet long. The mean range 
of tide is about 2.6 feet. The cost of new work for the 
completed project was $73,243. 
Local cooperation. Fully complied with except that 
local interests are to furnish spoil disposal areas as 
required for subsequent maintenance and guarantee 
the United States and its contractors against claims for 
damages to oyster beds attributable to subsequent 
maintenance. 
Terminal facilities. There are three privately-owned 
wharves open to the general public and a marine 
railway which are adequate for existing and reasonably 
prospective commerce. 
Operations and results during fiscal year. A contract for 
maintenance dredging of channel and basin was 
awarded June 30, 1970. 
Conditions at end of fiscal year. Project was completed in 
1939. 
17. OCEAN CITY HARBOR AND INLET 
AND SINEPUXENT BAY, MD. 
Location. Ocean City is on a barrier island between 
Sinepuxent Bay and Atlantic Ocean about 35 miles 
south of entrance to Delaware Bay. (See Coast and 
Geodetic Survey Chart 1220.) 
Existing project. An inlet between the Atlantic Ocean 
and Sinepuxent Bay, 10 feet deep and 200 feet wide, 
protected on south side by a stone jetty 2,380 feet long 
and on north side by a stone jetty projecting 1,531 feet 
into the Atlantic Ocean and connected on shore to a 
timber and stone bulkhead 255 feet long, continuing 
with a riprap dike 213 feet long and steel sheet pile 
bulkhead 460 feet long, along shore of inlet; a channel 
6 feet deep and 150 feet wide from inlet to Green Point, 
and thence 100 feet wide into Chincoteague Bay; a 
channel 10 feet deep at mean low water, 100 feet wide, 
and 3,000 feet long from inlet channel into marsh area 
south of railroad on west side of Sinepuxent Bay, with 
two turning basins of same depth; and a channel 6 feet 
deep and 125 feet wide from inlet Channel to a point 
opposite North Eighth Street in Ocean City, thence 75 
feet wide into Isle of Wight Bay. Mean range of ocean 
tide is 3.4 feet. Federal cost of new work for completed 
project was $360,530, exclusive of $500,000 contributed 
by local interests. 
160

BALTIMORE, MD., DISTRICT 
Local cooperation. Fully complied with except local 
interests must furnish spoil disposal areas for future 
maintenance as needed. 
Terminal facilities. On bay side of Ocean City; two 
storage basins, for pleasure and small commercial craft, 
and numerous privately-owned pile-and-timber piers 
and bulkhead wharves. At project harbor; a public 
landing about 1,000 feet long, several privately 
constructed bulkhead wharves open to the public for 
transaction of business with the owners, and a boat 
repair yard with a marine railway capable of handling 
boats up to about 150 tons. Project harbor is served by 
Baltimore, Chesapeake & Atlantic Railway, which has 
a spur line parallel to harbor on north side about 200 
feet away. All piers and wharves are accessible by 
highway. Adequate space is presently available for 
expansion of facilities as required. Terminal facilities 
for channel across Sinepuxent Bay to Assateague 
Island consist of a county-owned timber-bulkhead 
landing at both South Point and Assateague Island 
termini of channel. Adequate space is available for 
expansion of these facilities. 
Operations and results during fiscal year. Maintenance 
dredging, by contract, to restore inlet channel to 
authorized dimensions began April 6, 1970 and was 
completed April 19, 1970. A total of 47,400 cubic yards 
of material, place measure, was removed and deposited 
in authorized spoil disposal areas. 
Condition at end of fiscal year. Existing project was 
completed in 1936. Raising of the north jetty from 7 
feet to 9 feet in 1956 in accordance with plans for new 
construction authorized by the 1954 River and Harbor 
Act was accomplished with maintenance funds. 
Rehabilitation of north and south jetties was completed 
in August 1965. 
18. POCOMOKE RIVER, MD. 
Location. Pocomoke River is a tributary of Pocomoke 
Sound, a tidal estuary on the east side of Chesapeake 
Bay about 40 miles north of Cape Charles, Va. 
Previous projects. For details see page 282 of Annual 
Report for 1962. 
Existing project. Provides for channel 11 feet deep at 
mean low water and 150 feet wide from 11-foot depth 
in Pocomoke Sound to Tulls Point, thence 100 feet 
wide to deep water in Pocomoke River above Williams 
Point, and for construction of a dike along offshore side 
of channel between Tulls Point and end of existing 
dike; and a channel 9 feet deep at mean low water and 
100 to 130 feet wide from Shad Landing to bridge at 
Snow Hill. Length of project is about 8.7 miles from 
Pocomoke Sound to Williams Point, and about 4.5 
miles from Shad Landing to Snow Hill, Md. Shad 
Landing is about 25.7 miles above mouth of river. 
Mean range of tide is 2.4 feet in Pocomoke Sound 
and 2.5 feet in river at Snow Hill. Prolonged high winds 
on Chesapeake Bay frequently cause greater 
fluctuations. Estimated cost (1969) for new work is $1, 
071,458 exclusive of amounts expended under previous 
projects. Extension of channel above bridge at Snow 
Hill, 100 feet wide, 9 feet deep and widened to 150 feet 
to form a turning basin at upper end, is considered 
inactive and excluded from foregoing estimate. 
Estimated cost of this portion is $22,000 (1956). 
Local cooperation. Complied with for section of project 
from Pocomoke Sound to Pocomoke River and from 
Shad Landing to highway bridge at Snow Hill, 
authorized by acts of June 3, 1896, and August 30, 
1935, except local interests must furnish releases from 
damage to oyster beds and spoil disposal areas as 
required for future maintenance. Terms for section of 
project above highway bridge at Snow Hill, authorized 
by act of March 2, 1945, required local interests to 
furnish all lands, easements, rights-of-way, and spoil 
disposal areas for initial work and future maintenance, 
hold the United States free from damages resulting 
from improvement; and contribute one-half the initial 
cost of that portion of project, but not to exceed $4,250. 
This portion is considered inactive. Terms for 11-foot 
depth channel from Pocomoke Sound to deep water in 
Pocomoke River above Williams Point authorized by 
act of September 3, 1954, require local interest provide 
all lands, easements, rights-of-way, and spoil disposal 
areas for construction and future maintenance of 
project; and hold the United States free from damages 
due to construction and maintenance, including such 
damages as may occur to public or leased oyster beds. 
Terminal facilities. Waterfronts at Pocomoke City and 
Snow Hill are built up principally with earthfilled 
timber bulkheads, the majority of which are privately 
owned. A few of the warehouses and factories on the 
river at these communities have railroad sidings and 
mechanical freighthandling facilities. Any appreciable 
increase in commerce at Pocomoke City or Snow Hill 
would necessitate construction of new facilities and 
repair of existing structures. Adequate space is 
available for development of additional terminals. 
Operations and results during fiscal year. New work: 
Restudy of project modification authorized by 1954 
River and Harbor Act, continued throughout the fiscal 
year. 
Condition at end of fiscal year. Existing project is about 
19 percent complete. Work remaining is construction 
of channel 11 feet deep from Pocomoke Sound to 
Pocomoke River above Williams Point, and extension 
of dike along south side of channel to Tulls Point. Total 
costs for existing project were $656,427 of which $170, 
874 was for new work and $485,553 for maintenance. 
19. POTOMAC AND ANACOSTIA RIVERS, 
D. C., COLLECTION AND REMOVAL 
OF DRIFT 
Location. Project applies to the Potomac and 
Anacostia Rivers, Washington, D. C. and their 
tributaries. 
161

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Existing project. Collection and removal of drift from 
the waters of the Potomac and Anacostia Rivers and 
their tributaries in the Washington Area from the head 
of tidewater to Mount Vernon, Virginia. Total length 
of project, considering both sides of the waterway, is 
about 50 miles. 
Local cooperation. None required. 
Terminal facilities. See report for Washington Harbor, 
D. C. 
Operations and results during fiscal year. Maintenance 
operations, by hired labor, consisted of collection and 
disposal of 85,428 cubic feet of driftwood, ranging from 
small blocks up to timbers of large dimensions. 
Condition at end of fiscal year. Existing project is one of 
continuous maintenance. Navigation has been made 
safer by continued patrol and removal of drift material 
which began in July 1966. 
20. POTOMAC RIVER AND TRIBUTARIES 
AT AND BELOW WASHINGTON, D. C., 
ELIMINATION OF WATERCHESTNUT 
Location. The waterchestnut, botanically known as 
Trapa natans, is an annual fresh water plant infesting 
navigable portions of Potomac River and its tributaries 
between Key Bridge in District of Columbia and 
Maryland Point, 48 miles downstream of Washington, 
D.C. At the height of infestation in 1939, it covered 
about 10,000 acres of navigable waters between these 
limits. (See Coast and Geodetic Survey Charts 559 and 
560.) 
Existing project. A plan for complete eradication of 
waterchestnut from Potomac River and its tributaries 
at and below Washington, D.C. For details see Annual 
Report for 1969. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Removal of waterchestnut growth was in progress 
during the fiscal year in following areas; Washington 
Harbor, Potomac River at Alexandria, Va., Potomac 
River at Mount Vernon, Va., Occoquan Creek, Va., 
and Potomac River below Washington, D.C., by 
Government plant and hired labor. 
Condition at end of fiscal year. At the present time 
growth of the plant in the Potomac River and 
tributaries for a distance of 40 miles below Washington 
is being brought under control. However, an adequate 
annual removal operation for waterchestnuts is 
required. Should any abatement of the present removal 
operations be effected, the plants would quickly be 
reestablished and thus nullify all previous work and 
expenditures. 
21. RHODES POINT TO TYLERTON, MD. 
Location. Rhodes Point and Tylerton are two 
settlements about 1.5 miles apart on Smith Island, 
between Chesapeake Bay and Tangier Sound, about 
60 miles north of Virginia Capes and about 110 miles 
south of Baltimore. (See Coast and Geodetic Survey 
Chart 1224.) 
Existing project. Channel 6 feet deep and 50 feet wide 
from that depth in Tyler Creek to and including an 
anchorage basin of the same depth 150 feet wide and 
400 feet long at Tylerton; channel 6 feet deep and 50 
feet wide from that depth in Shanks Creek to and 
including an anchorage basin of the same depth 100 
feet wide and 400 feet long at Rhodes Point; channel 6 
feet deep and 50 feet wide from that depth in Big 
Thorofare River to Tylerton; channel 6 feet deep and 
50 feet wide from Rhodes Point to Tylerton. Mean 
range of tide is 1.7 feet. Estimated cost (1970) for new 
work is $120,700. 
Local Cooperation. Local interests must furnish without 
cost to the United States all lands, easements and 
rights-of-way for construction and subsequent 
maintenance of the project, including suitable areas for 
initial and subsequent disposal of spoil and also 
retaining dikes or the costs of such retaining dikes; hold 
and save the United States free from damages; provide 
and maintain at local expense at Rhodes Point and 
Tylerton a public landing or wharf; accomplish 
without cost to the United States alterations, 
relocations and removal as required of sewer, water 
supply and other utility facilities; establish a competent 
public body to regulate the use, growth and free 
development of the harbor facilities; establish 
regulations prohibiting discharge of untreated 
pollutants in the waters of the harbor; execute an 
assurance of compliance of the Civil Rights Act of 
1964; and assume full project costs in excess of $500, 
000. Assurances of local cooperation were accepted on 
December 6, 1968. 
Terminal facilities. There are numerous pile-andtimber 
wharves along waterfronts at Rhodes Point and 
Tylerton. Facilities are privately owned, but open to 
the public without charge when not in use by the 
owners, and are adequate for existing commerce. 
Sufficient space for construction of additional facilities 
is available, if required. 
Operations and results during fiscal year. New work: Plans 
and specifications were completed by hired labor. A 
new work contract for dredging the project to 
authorized dimensions was awarded June 30, 1970. 
Condition at end of fiscal year. Existing project is about 
35% complete. Work remaining is deepening of the 
channels from 4 feet to 6 feet and construction of 
anchorage basins at Rhodes Point and Tylerton. 
22. ST. JEROMES CREEK, MD. 
Location. St. Jeromes Creek is a tidal estuary in St. 
Marys County, Md., 2.5 miles long flowing in a 
southeasterly direction and entering the western shore 
of the Chesapeake Bay, 6 miles north of Point Lookout, 
at the mouth of the Potomac River. The creek is 86 
miles northerly of Norfolk, Va. (See Coast and 
Geodetic Survey Chart No. 557.) 
162

BALTIMORE, MD., DISTRICT 
Previous project. The original project for improvement 
was adopted by the River and Harbor Act of March 3, 
1881. For further details see Annual Report for 1890, 
page 114, and Annual Report for 1938, page 432. 
Existing project. Provides for a channel 100 feet wide 
and 7 feet deep from Chesapeake Bay to the Vicinity of 
Airedele, thence 60 feet wide to deep water in the 
creek, with a turning basin of the same depth 200 feet 
wide and 300 feet long opposite Airedele. The project is 
4,900 feet long. The plane of reference is mean low 
water. The tidal ranges are; Mean 1.3 feet, and 
extreme, approximately 7 feet. The cost to the Federal 
Government for new work, for the completed project 
was $17,857, exclusive of amounts expended under 
previous projects. 
Local cooperation. Fully complied with, except that 
local interests are to furnish spoil disposal areas for 
future maintenance as needed. 
Terminal facilities. There are 10 privately owned 
wharves, 2 of which are open to the public. It is 
considered that the present terminal facilities are 
adequate for present and prospective commerce. 
Operations and results during fiscal year. A contract for 
maintenance dredging of channel and basin was 
awarded June 30, 1970. 
Condition at end of fiscal year. The existing project was 
completed in 1939. The total costs for existing project 
were $70,480, of which $17,857 was for new work and 
$52,623 was for maintenance. 
23. SUSQUEHANNA RIVER AT 
WILLIAMSPORT, PA. 
Location. The project is located in Lycoming County, 
Pennsylvania, about 40 miles above the mouth of the 
West Branch Susquehanna River. (See U.S. Geological 
Survey Quadrangle Sheet, Williamsport, 
Pennsylvania) 
Existing project. A channel, 5 feet deep below extreme 
low water and varying in width from 180 feet to 500 
feet, from mile 40.0 to mile 51.4 of the West Branch 
Susquehanna River. The estimated cost (1970) of the 
improvement is $102,000, of which $62,000 is Federal 
and $40,000 non-Federal. 
Local cooperation. Local interests must furnish all 
lands, easements, and rights-of-way for new work and 
future maintenance; hold the United States free from 
damages; provide and maintain an adequate public 
landing; make required relocations and alterations; 
establish a public body to regulate the harbor facilities; 
make a lump sum cash contribution of 50 percent of the 
first cost of providing the channel; assume all project 
costs in excess of $500,000; and execute a compliance 
assurance with the Civil Rights Act of 1964. The 
assurances of local cooperation were accepted on June 
28, 1968. 
Terminal Facilities. The Susquehanna State Park has a 
public boat launching ramp as do several local 
marinas. 
Operations and results during fiscal year. New work: 
Preparation of plans and specifications, by hired labor, 
has been deferred pending receipt of real estate from 
local interests. 
Condition at end of fiscal year. Work remaining to be 
done is completion of plans and specifications and 
construction of project. 
24. TILGHMAN ISLAND HARBOR, MD. 
Location. This harbor (also called Dogwood Harbor) 
is about 60 miles southeast of Baltimore Harbor on 
eastern side of Tilghman Island, which lies between 
Chesapeake Bay and Choptank River. (See Coast and 
Geodetic Survey Chart 78). 
Previous projects. For details see page 278 of Annual 
Report for 1966. 
Existing project. Provides for a channel 60 feet wide 
and 6 feet deep from that depth in Harris Creek to and 
including two anchorage basins of same depth, 300 feet 
by 70 feet and 500 feet by an average width of 110 feet. 
Estimated Federal cost of new work is $55,800. 
Local cooperation. Local interests must furnish all 
lands, and rights-of-way for new work and future 
maintenance; hold the United States free from 
damages; build and maintain a suitable public landing 
with adequate approaches thereto; make required 
alterations and relocations; and make a lump sum cash 
contribution of 20.3 percent of the first cost of 
providing the channel and basin. Assurances of local 
cooperation were accepted on January 27, 1967. 
Terminal facilities. Consist of one pier operated by a 
local seafood packer for transfer of seafood to 
processing plant. Local interests will construct a public 
landing and approach road thereto in accordance with 
terms of local cooperation as part of project 
development. 
Operations and results during fiscal year. New Work: 
Plans and specifications were completed by hired 
labor. A new work contract for dredging the project 
was awarded on June 30, 1970. 
Condition at end of fiscal year. Preparation of plans and 
specifications are complete. Work remaining is 
dredging of project. Total costs for existing project were 
$6,586, of which $5,753 was for new work and $833 for 
maintenance. 
25. TRED AVON RIVER, MD. 
Location. This stream, formerly called Treadhaven 
Creek, rises in Talbot County, Md., flows southerly, 
and empties into Choptank River 10 miles above its 
mouth. It is about 10 miles long and is a tidal estuary 
with very little natural flow. Drainage area is 36 square 
miles. (See Coast and Geodetic Survey Chart 78.) 
163

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Previous project. For details see page 397 of Annual 
Report for 1951. 
Existing project. Provides for a channel 12 feet deep 
and 150 feet wide in Tred Avon River from that depth 
in river near Peach Blossom Creek to Easton Point, 
thence a channel of same depth and width and about 1, 
400 feet long in the North Fork, thence a channel of 
same width and 8 feet deep and about 700 feet long 
with a turning basin of same depth at upper end. 
Project also provides for a turning basin in South Fork 
12 feet deep and 250 feet wide and 600 feet long on east 
side of main channel at Easton Point. Section included 
in project is about 2 miles long, and its lower end is 
about 7.5 miles above mouth. Mean range of tide is 
about 2 feet. Cost estimate (1969) for new work is $356, 
700, exclusive of amounts expended under previous 
project. 
Local cooperation. Project was modified subject to 
conditions that local interests provide lands, rights-ofway, 
and disposal areas for construction and future 
maintenance, hold the United States free from 
damages, and provide and maintain all necessary 
utilities, including a public landing with suitable 
supply facilities open to all on equal terms; establish a 
competent and properly constituted public body to 
regulate use, growth, and free development of harbor 
facilities; provide and maintain depth in berthing 
areas, and local access channels serving terminals 
commensurate with depths provided in related project 
areas. In addition, the act of March 2, 1919, required 
that the town of Easton previously establish, adjacent 
to proposed improvement of North Fork, public 
terminal facilities to be permanently open to all vessels 
on equal terms, and connected to the city by proper 
public highways. Assurances of local cooperation were 
accepted on August 30, 1968. 
Terminal facilities. Five large terminals for receiving 
and distributing petroleum products, and a marina 
with stalls and ships, marine railway, a launching 
ramp, and a 6-ton travel-lift at Easton Point. These 
facilities are in good condition. 
Operations and results during fiscal year. Completion of a 
General Design Memorandum, by hired labor, has 
been deferred pending provision of spoil disposal areas 
by local interests. 
Condition at end of fiscal year. Existing project is 39 
percent complete. Work remaining is that authorized 
by River and Harbor Acts of 1919 and 1965. Total 
costs for existing project were $18,745, of which $7,597 
was for new work and $11,148 for maintenance. 
26. TWITCH COVE AND BIG 
THOROFARE, MD. 
Location. A tidal waterway about 4 miles long 
traversing Smith Island, Md., southeasterly from 
Chesapeake Bay on the west to Tangier Sound on the 
east. (See Coast and Geodetic Survey Chart 1224.) 
Existing project. A channel 7 feet deep at mean low 
water and 60 feet wide from Twitch Cove on Tangier 
Sound through Big Thorofare, thence through canal at 
Ewell, Md., thence through Levering Creek and Big 
Thorofare to vicinity of Swan Point, thence of same 
depth and 100 feet wide through offshore bar to deep 
water in Chesapeake Bay, with twin stone jetties at 
entrance, north jetty is about 2,080 feet long, and south 
jetty about 1,800 feet long; and anchorage basin 7 feet 
deep, 100 feet wide, and 700 feet long connecting with 
west side of existing project channel at Ewell; extension 
of existing project channel in Levering Creek, 6 feet 
deep, 60 feet wide, and 1,000 feet long; and a channel 4 
feet deep and 25 feet wide around point between Big 
Thorofare and Tylers River. Mean range of tide is 1.7 
feet, and extreme tidal range is 3 feet. Federal cost of 
new work for completed project was $193,175. 
Local cooperation. Fully complied with, except that 
local interests are to furnish spoil disposal areas for 
future maintenance as needed. 
Terminal facilities. Numerous privately owned pileand-
timber wharves and bulkheads at Ewell which are 
open to the public for business transactions with the 
owners. A county wharf is also at west end of town. Five 
crab houses are on Levering Creek, and one oyster 
house on project waterway west of town of Ewell. 
Operations and results during fiscal year. A contract for 
maintenance dredging, of critical shoals in the channel 
between jetties at entrance to Big Thorofare, was 
awarded June 30, 1970. 
Condition at end of fiscal year. Existing project is 
complete. Work authorized by 1950 River and Harbor 
Act was completed in September 1956 and work 
authorized under prior acts was completed in 
November 1940. 
27. WASHINGTON HARBOR, D.C. 
Location. Within District of Columbia at junction of 
Anacostia River with Potomac River which flows 
southeasterly 108 miles to Chesapeake Bay. It is 
southerly 202 miles by water from Baltimore, Md., and 
northerly 195 miles from Norfolk, Va. (See Coast and 
Geodetic Survey Chart 560.) 
Previous projects. For details see page 291 of Annual 
Report for 1963. 
Existing project. A combination and extension of latest 
projects for Potomac River at Washington, D.C., and 
Anacostia River, D.C. Project provides for; (a) 
Virginia Channel, from Giesboro Point to Francis 
Scott Key Bridge, 24 feet deep and 400 feet wide, with 
width increased as necessary to afford a low-water cross 
section area of 25,000 square feet; (b) Washington 
Channel, from Hains Point to head of Washington 
Channel, 24 feet deep and 400 feet wide; (c) Anacostia 
River from Giesboro Point to Anacostia Bridge, 24 feet 
deep and 400 feet wide, with turning basin 800 feet 
wide and about 2,400 feet long of same depth opposite 
Naval Weapons Plant; (d) Anacostia River from 
164

BALTIMORE, MD., DISTRICT 
Anacostia Bridge 24 feet deep and 200 feet wide to 
turning basin 400 feet square of same depth at foot of 
15th Street SE. Channel lengths including turning 
basins are; Virginia Channel, 25,000 feet; Washington 
Channel, 10,000 feet; and Anacostia River, 15,000 
feet; and (e) operation and maintenance of inlet gates 
and lock and outlet gates of Tidal Basin constructed 
under a previous project to flush Washington Channel. 
Plane of reference is low-water datum which is 0.35 
foot below mean low tide as observed from 1932 to 
1942. Tidal ranges are; Mean, 2.9 feet; irregular, 4.5 
feet; and extreme, 10.7 feet. Estimated Federal cost 
(1955) for new work is $572,000, exclusive of amounts 
expended under previous projects. 
Local cooperation. None required. 
Terminal facilities. There are four wharves generally of 
bulkhead type on Virginia Channel that are privately 
owned and not open to the public except by special 
arrangement. On Washington Channel there are four 
piers under jurisdiction of District of Columbia, two of 
which are open to the public and one open to the public 
by special arrangement. In Anacostia River there are 
four privately owned piers and eight governmental 
piers and slips. None of the piers are open to the public 
except by special arrangement. Terminal facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Tidal Basin gates were operated and maintained by 
hired labor throughout the year. 
Condition at end of fiscal year. Existing project is about 
30 percent complete. Channels and basins in Anacostia 
River are complete and those at Forks of channel at 
Hains Point are partially complete. Except for 
dredging between limits of 2,000 feet above and 3,000 
feet below Memorial Bridge, no new work has been 
done downstream of Key Bridge in Virginia Channel. 
Work remaining to complete project consists of 
removing rock in Virginia Channel upstream of 
Memorial Bridge, and dredging Virginia Channel 
from Giesboro Point upstream to a point 3,000 feet 
below Memorial Bridge. Total costs for existing project 
were $1,938,837 of which $162,006 was for new work 
and $1,776,831 was for maintenance. This excludes $4, 
000 for emergency dredging under provisions of section 
3, 1945 River and Harbor Act. 
28. WICOMICO RIVER, MD. 
Location. Wicomico River has its source in northern 
part of Wicomico County, Md., and flows generally 
southwardly emptying into Monie Bay, a tributary of 
Tangier Sound on east side of Chesapeake Bay about 
85 miles southeast of Baltimore. Webster Cove is site of 
improved small-boat harbor on southeast bank of 
Wicomico River about 3 miles above the mouth. (See 
Coast and Geodetic Survey Charts 567 and 1224.) 
Previous projects. For details see page 275 of Annual 
Report for 1962. 
Existing project. Channel 14 feet deep and 150 feet 
wide from Chesapeake Bay to Salisbury, section 
included in project is 37 miles long, including about 12 
miles from mouth of river to Chesapeake Bay; 14 feet 
deep in channels and turning basins in north and south 
prongs with channel widths of 100 feet, and a channel 6 
feet deep and 60 feet wide extending from 6-foot 
contour in Wicomico River to and including a basin in 
Webster Cove of same depth, 100 feet and 400 feet 
long; and extension of basin 200 feet long and 100 feet 
wide on each side. Plane of reference is mean low 
water. Mean range of tide is about 3 feet and extreme 
tidal range is 4.4 feet. Cost of new work for completed 
project was $421,609, exclusive of amounts expended 
on previous project. 
Local cooperation. Fully complied with, except that 
local interests are to furnish spoil disposal areas for 
future maintenance as needed and hold the United 
States free from such damages as may occur to public 
or leased oyster beds. 
Terminal facilities. Present waterfront at Salisbury 
consists of pile-and-timber bulkheads with earthfills. 
Some wharves have warehouses and factories with 
mechanical freight-handling facilities and rail sidings. 
With exception of wharf on north prong, owned by 
State Roads Commission, and a wharf on south prong, 
owned by the county, all terminals are privately 
owned. A shipyard, with two marine railways with 
capacities of 1,200 and 500 tons, respectively, is on 
right bank of river below prongs. Areas for 
development of new terminals on north and south 
prongs are limited. Areas for considerable expansion of 
terminal facilities are available on main river. There is 
a pile-and-timber wharf about 4 miles above mouth of 
river at Mount Vernon. A wharf of similar construction 
is at White Haven. There is a county wharf at head of 
basin in Webster Cove, a pile-and-timber pier at oyster 
house on southwest side of basin, a T-shaped pile-andtimber 
pier at cafe on southwest side of basin and 
several small timber piers on walkways that local 
interests constructed around the basin. Fueling 
facilities are available at the T-shaped pier. Sufficient 
areas are available for construction of additional 
facilities when required. 
Operations and results during fiscalyear. Maintenance: A 
hydrographic survey and preparation of plans were 
completed by contract. The work has been deferred 
pending provision of spoil disposal areas by local 
interests. 
Condition at end of fiscal year. Existing project was 
completed in 1942 except for enlarging basin in 
Webster Cove which was completed November 1956. 
Total costs for existing project were $1,013,948 of 
which $421,609 (Federal funds) and $33,000 
(contributed funds) were for maintenance. 
165

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
29. RECONNAISSANCE AND CONDITION 
SURVEYS 
(See Table 4-C at end of chapter.) 
30. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See Table 4-D at end of chapter.) 
31. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION Navigation activities 
pursuant to Section 107, Public Law 86-645 
(preauthorization) 
Fiscal year costs for preauthorization studies were 
$1,428 for Point Lookout State Park, St. Mary's 
County, Md., and $1,691 for Northeast River, Md. 
BEACH EROSION CONTROL 
32. OXFORD, MD. 
Location. The Town of Oxford, situated on the east 
bank of the Tred Avon River about 2 miles above its 
mouth, is located 70 miles from Baltimore on 
Maryland's Eastern Shore in Talbot County. (See 
Coast and Geodetic Survey Charts 1225 and 551.) 
Existing project. Provides for construction of 
improvements for shoreline protection fronting a street 
known as The Strand. Protection for the bank along 
The Strand consists of a sloped stone revetment (from 
the vicinity of Morris Street to the vicinity of Mill 
Street a distance of about 1,000 feet). The mean range 
of tide is 1.4 feet. Latest approved estimate of cost is 
$155,500, of which $73,000 is non-Federal. 
Local cooperation. Federal participation in the above 
project would be subject to the conditions that local 
interests hold and save the United States free from 
claims for damages that may result from construction 
or maintenance of the project; provide a cash 
contribution of 50 percent of the total first cost of the 
project, a sum presently estimated at $73,000; assume 
full responsibility for all project costs in excess of the 
Federal cost limitation of $500,000; maintain during 
the economic life of the project continued public 
ownership and use of the present non-Federally 
publicly-owned shores which Federal participation is 
based; provide, without cost to the United States, all 
lands, easements, and rights-of-way necessary for 
construction and subsequent maintenance of the 
project and assure maintenance and repair during the 
economic life of the works as may be required to serve 
the intended purpose. 
Operations and results during fiscal year. New Work: 
Preparation of a Detailed Project Report, by hired 
labor, began in April 1965 and was completed in July 
1969. Preparation of contract plans and specifications 
were initiated. Costs were $221. 
Condition at end of fiscal year. The project was adopted 
on May 15, 1970. Funds to initiate contract plans and 
specifications for the project were received on June 2, 
1970. Work remaining is completion of plans and 
specifications and construction of the project. Total 
cost to June 30, 1970 was $9,721 of which $9,500 was 
for the preparation of the Detailed Project Report. 
33. BEACH EROSION CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
Beach erosion control activities pursuant to Section 103, 
Public Law 87-874 (preauthorization) 
Fiscal year costs were $5,370 for Point Lookout State 
Park, Md., $1,288 for Thomas Point Park, Anne 
Arundel County, Md., $2,500 for Black Walnut Point, 
Tilghman Island, Md., $2,500 for St. Clements Island, 
Md., $1,000 for Oxford, Md., and $2,478 for 
Westmoreland State Park, Va. 
FLOOD CONTROL 
34. ANACOSTIA RIVER AND 
TRIBUTARIES, FLOOD PROTECTION 
AND NAVIGATION IMPROVEMENTS, 
D. C. AND MD. 
Location. Project is on Anacostia River at confluence 
of northeast and northwest branches at Bladensburg, 
Md., about 9 miles above mouth at Washington, D.C. 
(See Coast and Geodetic Survey Chart 560.) 
Existing project. Channel improvements of Anacostia 
River from foot of 15th Street SE in District of 
Columbia, to junction of Northeast and Northwest 
Branches at Bladensburg, Md.; channel improvement 
in Northeast Branch from mouth upstream to near 
Longfellow Street in Riverdale, Md.; channel 
improvement in Northwest Branch from mouth 
upstream to near 38th Street in Brentwood, Md.; levees 
along both banks of the streams to protect Bladensburg, 
Edmonston, Riverdale, Cottage City, and Colmar 
Manor, Md.; interior drainage facilities in these 
communities, including four pumping stations and 
necessary intercepting sewers; and alterations and 
reconstruction of highway and railroad bridges. 
Portion of channel improvement of Anacostia River 
from vicinity of 15th Street SE in District of Columbia 
to near Defense Highway Bridge on U'S' Route 50, 
provides for navigation channel 8 feet deep and 80 feet 
wide with a commercial boat basin, and a recreational 
boat basin having a capacity of 150 boats, both on east 
bank of river near Bladensburg, Md. Federal cost for 
new work for completed project was $6,042,325. 
Estimated cost to local interests for construction, lands, 
and damages is $6,275,000. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. A contract for 
maintenance dredging of channel was awarded June 
30, 1970. 
Condition at end of fiscal year. Existing project was 
started in November 1954 and completed in November 
1959. Project was transferred to Washington Suburban 
166

BALTIMORE, MD., DISTRICT 
Sanitary Commission November 17, 1959 for operation 
and maintenance. (For further details see Annual 
Report for 1967.) 
35. ANACOSTIA RIVER AND 
TRIBUTARIES, PRINCE GEORGES 
COUNTY, MD. 
Location. The project includes the Northeast Branch 
and the Northwest Branch and Tributaries of the 
Anacostia River upstream from the existing project at 
Bladensburg, Md. (See Coast and Geodetic Survey 
Chart 560.) 
Existing project. Provides for channel improvement by 
realigning, widening, and deepening the streambed of 
the Northwest Branch upstream and downstream from 
Queens Chapel Road bridge for a total distance of 5, 
610 feet; channel improvement by realigning, 
widening, and deepening some 7,200 feet of channel of 
Northeast Branch and Paint Branch, starting 540 feet 
upstream from the new Calvert Road bridge and 
extending up Paint Branch to Baltimore Avenue 
bridge; and channel realigning, deepening, and 
widening of Indian Creek from its junction with Paint 
Branch, 7,600 feet upstream to Greenbelt Road 
culvert. Overbank clearing to provide a 500-foot 
floodway will also be included along the Northeast 
Branch and Paint Branch. Estimated Federal cost for 
new work is $473,000. Estimated cost to local interests 
is $112,000. 
Local cooperation. Local interests must provide all 
lands, easements, and rights-of-way necessary for 
construction and maintenance of the project; modify or 
relocate buildings, utilities, roads and other facilities 
where necessary for the construction of the project; 
assume responsibility for all costs in excess of the 
Federal cost limitation of one million dollars; hold and 
save the United States free from damages due to the 
construction and maintenance of the project; maintain 
and operate all the works after completion in 
accordance with regulations prescribed by the 
Secretary of the Army; prevent any encroachment on 
the project channel which would decrease the 
effectiveness of the flood control improvements; and 
inform affected interests at least annually of the degree 
of protection provided by the project. 
The Washington Suburban Sanitary Commission is 
legally empowered to cooperate with the Federal 
Government in this project and has assured the District 
Engineer of its full cooperation in the development of a 
flood protection program in the Anacostia Basin, and 
that it will represent local interests in providing local 
cooperation. 
Operations and results during fiscal year. Revisions to the 
Detailed Project Report were completed by hired 
labor. An Architect-Engineer firm was selected to 
prepare the contract plans and specifications for 
construction of the project. 
Condition at end of fiscal year. Project was adopted on 
March 3, 1970 as a Section 205 project. Work 
remaining is preparation of contract plans and 
specifications and construction of project. 
36. BLOOMINGTON LAKE, NORTH 
BRANCH POTOMAC RIVER, MD. & W. 
VA. 
Location. Damsite is on North Branch of Potomac 
River about 2 miles upstream from Bloomington, Md. 
(See Geological Survey Quadrangle sheets, 
"Kitzmiller" and "Westernport, Md.") 
Existing project. Plan of improvement consists of a 
rolled earth and rock fill dam with an impervious core 
and an 800-foot long dike on the left bank. Top of dam 
would be 296 feet above streambed with a total length 
of 2,050 feet. When filled to spillway crest, reservoir 
would extend about 6.6 miles upstream and inundate 
965 acres. Flood control storage of 36,200 acre-feet 
would be provided. Storage available for low flow 
augmentation for water supply and water quality 
improvement would be 92,000 acre-feet. Reservoir 
would control a drainage area of 263 square miles. 
Estimated Federal cost (1970) of new work is $90,400, 
000, of which $63,600,000 is for construction and $26, 
800,000 for lands and damages. 
Local cooperation. Local interests must; (a) agree to pay 
all costs allocated to water supply amounting to 33.2 
percent of project construction cost presently estimated 
at $30,000,000; in a lump sum prior to start of 
construction or in installments before commencement 
of pertinent work items in accordance with 
construction scheduled as required by the Chief of 
Engineers; or as an alternative, contract with United 
States to repay, within 50 years, a portion of costs 
allocated to water supply on basis of initial 
requirements, amounting to 5.8 percent of construction 
cost and presently estimated at $5,240,000, plus interest 
during construction on this amount, with interest on 
unpaid balance and payments to begin when storage is 
first available for water supply; and repay remaining 
costs allocated to water supply on basis of future 
requirements, amounting to 27.4 percent of 
construction cost, presently estimated at $24,760,000 
plus interest during construction on this amount with 
interest on unpaid balance beginning 10 years after 
storage is first available for water supply and with final 
payment to be made 50 years thereafter, except that no 
interest will be charged thereon for first 10 years after 
storage is first available for water supply; (b) contract 
with United States to pay operation and maintenance 
cost allocated to water supply, presently estimated at 
$29,500 annually, beginning when storage is first 
available for water supply; (c) agree to pay major 
replacement costs allocated to water supply as such 
costs are incurred, presently estimated to average $23, 
600 annually; (d) control pollution of streams subject 
to low flow augmentation by adequate treatment or 
167

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
other methods of controlling wastes at their source; and 
(e) protect downstream channels from encroachments 
which would adversely affect operation of project. 
Operations and results during fiscal year. Design 
memoranda for cemetery relocation and geology soils 
and test embankment were completed. Preparation of 
other feature design memoranda were continued. Plans 
and specifications for preliminary work on the dam 
and railroad relocation downstream from the dam 
were completed. Phase II railroad relocation plans and 
specifications are underway. A revised water supply 
contract was prepared in final form and submitted to 
the Maryland Potomac Water Authority for signature. 
Condition at end offiscalyear. Preconstruction planning 
is complete. Land acquisition is behind schedule 
pending receipt of executed water supply contract. 
Construction has not started. 
37. CUMBERLAND, MD., AND RIDGELEY, 
W. VA. 
Location. On North Branch of Potomac River, 21 
miles upstream from its junction with South Branch of 
Potomac River and 197 miles upstream from 
Washington, D.C. (See Geological Survey 
Quadrangles, Frostburg and Flint Stone, Md., W. Va., 
and Pa.) 
Existing project. Channel improvements of North 
Branch of Potomac River from Western Maryland 
Railway bridge in South Cumberland upstream to 
mouth of Wills Creek, with levees and fill along left 
bank and levees along right bank from downstream 
corporate limits of Ridgeley, W. Va., to a point about 
150 feet above Johnson Street Bridge; channel 
improvements along Wills Creek from its mouth 
upstream to a point in the Narrows about 500 feet 
upstream from highway bridge on U.S. Highway 40; 
levee and floodwall in West Cumberland, Md., on left 
bank of North Branch of Potomac River from mouth of 
Wills Creek upstream to Kelly Boulevard; levee and 
floodwall in Ridgely, W. Va., on right bank of North 
Branch of Potomac River from Carpenter Avenue 
upstream to Patapsco Street near upstream corporate 
limits of Ridgeley, W. Va.; interior drainage facilities 
in Cumberland and West Cumberland, Md., and 
Ridgeley, W. Va.; removal of Chesapeake and Ohio 
Canal dam and construction of a new industrial dam 
on North Branch of Potomac River immediately above 
mouth of Wills Creek; and alteration and 
reconstruction of highway and railroad bridges. 
Federal cost of new work for the completed project was 
$15,633,970, which includes $49,998 emergency relief 
funds and is exclusive of $197,513 public works 
acceleration funds. Estimated cost to local interests is 
$2,900,000 of which $1,402,001 is contributed funds 
and $1,497,999 is for lands and damages. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Removal of gravel deposits, grass cutting of areas 
channelward of levees, and removal of brush and debris 
from channel were accomplished as required in 
channel area. 
Condition at end of fiscal year. Existing project was 
started in March 1949 and completed in May 1959, 
except for minor items of land acquisition, which were 
completed in June 1963. Project was transferred to city 
of Cumberland, Md., for operation and maintenance 
May 1959. 
38. LACKAWANNA RIVER BASIN, PA. 
Location. The basin includes an area of 346 square 
miles in north-eastern Pennsylvania. (See Geological 
Survey maps; "Avoca," "Carbondale," "Clifford," and 
"Scranton," Pa.) 
Existing project. Individual units, which constitute 
approved plan of improvements, are; Scranton, Pa.; 
Plan of improvement provides for construction of earth 
levees, a concrete floodwall and appurtenant drainage 
structures. Local runoff and sewage from protected 
areas will be collected by interceptor sewers and 
discharged by pumping station during high river 
stages. Protective works between Hickory Street and 
Roaring Brook will be designed for a discharge of 24, 
500 cubic feet per second while the reach downstream 
from Roaring Brook will be protected against a 
discharge of 35,000 cubic feet per second. Estimated 
Federal cost (1970) of new work is $2,006,800. 
Estimated cost to local interests is $4,090,000, of which 
$3,330,000 is for dredging and construction of channel 
improvements accomplished by the Commonwealth of 
Pennsylvania and $760,000 for lands and damages. 
Aylesworth Creek Lake; On Aylesworth Creek 
about 1.0 mile above its confluence with Lackawanna 
River and control a drainage area of 6.2 square miles. 
The Lake extends about 4,600 feet and inundates 87 
acres when filled to spillway crest. Flood control 
storage would be 1,700 acre-feet, equivalent to 5.1 
inches of runoff from drainage area. Dam is earth fill 
with a maximum height of 90 feet above streambed 
and a top length of 1,200 feet. Estimated Federal cost 
(1970) of new work, is $2,160,000 of which $2,091,000 
is for construction and $69,000 is for lands and 
damages. 
Fall Brook Reservoir; Would be on Fall Brook about 
5 miles above its confluence with Lackawanna River at 
Carbondale, Pa., and control a drainage area of 4.1 
square miles, and at spillway crest would extend 4,400 
feet and inundate 62 acres. Flood control storage would 
be 1,400 acre-feet, equivalent to 6.4 inches of run off 
from drainage area. Dam would be earthfill with a 
maximum height of 67 feet above streambed and top 
length of 890 feet. Estimated Federal cost (1965) of new 
work is $1,965,000, of which $1,858,000 is for 
construction and $107,000 is for lands and damages. 
Local cooperation. None required for reservoirs. For 
Scranton local protection project, local interests must 
provide lands and rights-of-way for construction of 
168

BALTIMORE, MD., DISTRICT 
improvements, including areas required for borrow, 
clearing, spoil, ponding, and floodways; make 
necessary utility changes, railroad relocations, and 
restore streets and roads affected by construction; hold 
the United States free from damages; maintain and 
operate all works, including ponding areas and 
channel improvements; protect channels and ponding 
areas from future encroachment or obstruction, 
including waste disposal, that would reduce their floodcarrying 
capacity by adoption and enforcement of 
regulations designed to prevent encroachment. 
Operations and results during fiscal year. Scranton, Pa.: 
The Operation and Maintenance Manual was 
completed in September 1969. Final payment on the 
contract for construction of a levee, floodwall, and 
pumping station was made in November 1969. Costs 
for new work were $21,809. 
Aylesworth Creek Lake, Pa.: Construction, by 
contract, of the dam and appurtenances began on 
November 20, 1967, and is 93 percent complete. 
Preparation of the Operation and Maintenance 
Manual began in April 1970 and is 65 percent 
complete. Costs for new work were $849,259. 
Condition at end of fiscal year. Scranton, Pa.: 
Construction was completed in June 1969. The project 
was turned over to the City of Scranton for operation 
and maintenance on 6 February 1969. 
Aylesworth Creek Lake, Pa.: Construction of the 
overall project is 81 percent complete. 
Fall Brook Reservoir, Pa.: Project was deleted from 
Fiscal Year 1967 budget and deferred for further study 
in the Susquehanna River Comprehensive 
Investigation. 
39. LAKE RAYSTOWN, RAYSTOWN 
BRANCH, JUNIATA RIVER, PA. 
Location. Damsite is on Raystown Branch, about 5.5 
miles upstream from its confluence with Juniata River. 
Project is about 10 miles south of Huntingdon, Pa. (See 
Geological Survey Quadrangle sheets, Huntingdon, 
Mt. Union, Broad Top and Everett, Pa.) 
Existing project. Plan consists of a rock and earth fill 
dam rising 225 feet above streambed with a gated 
concrete spillway and auxiliary spillway in the right 
abutment. Reservoir capacity would be 762,000 acrefeet, 
of which 248,000 acre-feet would be for flood 
control, 476,000 acre-feet for recreation and water 
quality control and the balances as sediment reserve. 
At full flood control pool elevation, reservoir would 
inundate 10,800 acres and extend 34 miles upstream. 
Estimated Federal cost (1970) for new work, excluding 
power facilities, is $61,900,000, of which $35,580,000 is 
for construction and $26,328,000 is for lands and 
damages. 
Local cooperation. None required. 
Operations and results during fiscal year. New work: The 
sedimentation design memorandum was completed by 
hired labor. Plans and specifications for highway 
relocation and Heston dike are 95 percent complete. 
Construction of dam and appurtenances, by contract, 
began in November 1968 and is 25 percent complete. 
Relocation of gas pipelines, by contract, began in May 
1969 and is in progress. Acquisition of lands continued 
during the fiscal year. 
Condition at end of fiscal year. Construction the overall 
project is 26 percent complete. Work remaining is 
completion of engineering and design required during 
construction, acquisition of lands, and construction of 
the project. 
40. SOUTHERN NEW YORK FLOOD 
CONTROL PROJECTS 
Location. Upper watershed of Susquehanna River to 
and including Chemung River. This includes about 6, 
050 square miles in south central New York, and about 
1,480 square miles in northern Pennsylvania. (See 
Geological Survey index maps of New York and 
Pennsylvania.) 
Existing project. Provides for construction of reservoirs 
and related flood control works for protection of towns 
in New York and Pennsylvania. Individual units (Also 
see Table 4-F on Dams and Reservoirs and Table 4-G 
on Local Flood Protection Works at end of chapter.) 
which constitute approved plan of improvement are 
described in following paragraphs; 
Davenport Center Reservoir: Will be on Charlotte 
Creek near Davenport Center, N.Y. Dam will be earth 
fill, 3,400 feet long at top of embankment and rising 
100 feet above streambed, with a concrete spillway in 
right abutment and outlet conduit in valley floor. 
Reservoir will provide a storage capacity of 52,500 
acre-feet. Estimated Federal cost (1970) for new work is 
$20,900,000, of which $14,780,000 is for construction 
and $6,120,000 is for lands and damages. 
West Oneonta Reservoir: Will be on Otego Creek 
near West Oneonta, N.Y. Dam will be earth fill, 1,200 
feet long at top of main embankment and rising 86 feet 
above streambed, with a concrete spillway and outlet 
conduit in right abutment. Main embankment will be 
joined at left abutment by a low dike, 6,700 feet long. 
Reservoir will provide a storage capacity of 34,500 
acre-feet. Estimated cost (1964) of new work is $11,600, 
000 of which $8,800,000 is for construction and $2,800, 
000 is for lands and damages. 
East Sidney Reservoir: On Ouleout Creek near East 
Sidney, N.Y. Dam is concrete gravity and earth fill, 2, 
010 feet long at top of embankment, 130 feet above 
streambed, and 146 feet above firm rock, with five gate 
controlled outlets in spillway section of dam; 750 feet of 
dam, including spillway, is concrete gravity section and 
1,260 feet is rolled earth embankment. Reservoir 
provides a storage capacity of 33,550 acre-feet. Federal 
cost of new work, completed in 1956, is $5,867,138, of 
which $5,279,894 is for construction and $587,244 for 
lands and damages. Estimated cost (1969) of new work 
for recreational facilities is $175,000. 
169

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Copes Corner Reservoir: Will be on Butternut Creek 
near Copes Corner, N.Y. Dam will be earth fill, 1,150 
feet long at top of embankment and rising 75 feet above 
streambed, with a concrete spillway and outlet conduit 
in right abutment. Reservoir will provide a storage 
capacity of 37,900 acre-feet. Reservoir project to be 
restudied; Estimated Federal cost (1956) of new work is 
$16 million, of which $13,250,000 is for construction 
and $2,750,000 for lands and damages. 
Whitney Point Reservoir: On Otselic River near 
Whitney Point, N.Y. Dam is earth fill, 4,900 feet long 
at top of embankment and rising 95 feet above 
streambed, with a concrete spillway and outlet conduit 
in left abutment. Reservoir has a storage capacity of 86, 
440 acre-feet. Federal cost of new work, completed in 
1953, was $5,075,000, of which $3,978,533 was for 
construction and $1,096,467 was for lands and 
damages. Estimated cost of new work (1970) for 
recreational facilities is $374,400. 
Arkport Reservoir: On Canisteo River near Hornell, 
N.Y. Dam is earth fill, 1,200 feet long at top of 
embankment and 113 feet above streambed, with a 
concrete spillway and outlet conduit in right abutment. 
Reservoir has a storage capacity of 7,950 acre-feet. 
Federal cost of new work, completed in 1953, was $1, 
910,000, of which $1,777,732 was for construction and 
$132,268 was for lands and damages. 
Almond Reservoir: On Canacadea Creek near 
Hornell, N.Y. Dam is earth fill, 1,260 feet long at top of 
embankment and rising 90 feet above streambed, with 
a concrete spillway and outlet conduit in left abutment. 
Reservoir provides a storage capacity of 14,800 acrefeet. 
Federal cost of new work, completed in 1956, was 
$5,550,611, of which $4,596,587 was for construction 
and $954,024 was for lands and damages. Federal cost 
of new work for recreational facilities completed in 
1966 was $59,600. 
Oxford, N.Y.: Construction of earth levees and 
clearing of Chenango River channel, consisting of; 
About 2,100 feet of earth levee on left bank of 
Chenango River, extending from high ground near 
Cemetery Drive and running mostly along railroad to 
high ground near Main Street; removal of dam and 
island below Main Street; raising Delaware, 
Lackawanna & Western Railroad over levee; and 
appurtenant closure and drainage structures. 
Improvement provides protection for village of Oxford 
on left bank against a flood discharge substantially 
larger than maximum flood of record, which occurred 
in July 1935. Federal cost of new work, completed in 
1952, was $131,000, of which $96,944 was for 
construction and $34,056 was for lands. Estimated 
local cost (1952) of lands and damages is $11,000. 
Lisle, N.Y.: Channel realinement and construction 
of earth levees and concrete floodwalls, consisting of; 
Relocation of about 3,000 feet of Dudley Creek 
channel, extending from 1,200 feet west of intersection 
of Cortland and Main streets to confluence with 
Tioughnioga River, realinement of some 5,700 feet of 
Tioughnioga River channel east of village; about 4,150 
feet of earth levee and 970 feet of concrete wall on right 
bank of Dudley Creek and Tioughnioga River, 
realinement of some 5,700 feet of Tioughnioga Street to 
railroad crossing on River Street; raising about 1,860 
feet of Delaware, Lackawanna & Western single track 
railroad over the levee; relocation of about 1,600 feet of 
Cortland Street; a new bridge over relocated Dudley 
Creek; and appurtenant drainage structures. 
Improvement provides protection for village of Lisle 
against flood discharges 20 percent greater on 
Tioughnioga River and about 100 percent greater on 
Dudley Creek than corresponding discharges of 
maximum flood of record, which occurred in July 1935. 
Federal cost of new work, completed in 1954, was $661, 
199, of which $605,000 was for construction and $56, 
199 was for lands and damages. Estimated local cost 
(1956) of lands and damages is $68,000. 
Whitney Point, N.Y.: Channel realinement and 
construction of earth levees, consisting of; Realinement 
of about 1,800 feet of Tioughnioga River channel, 
above confluence with Otselic River; about 7,100 feet 
of earth levee along right bank of Tioughnioga River, 
extending from high ground on Main Street above 
village to Collins Street just below village; and 
appurtenant drainage structures. Improvement 
supplemented by Whitney Point Reservoir above the 
area, provides protection for village of Whitney Point 
against a flood discharge about 20 percent greater than 
maximum flood of record, which occurred in July 1935. 
Federal cost of new work, completed in 1952, was $424, 
096, of which $411,653 was for construction and $12, 
443 for lands and damages. Estimated local cost (1956) 
of land and damages is $62,500. 
Binghamton, N.Y.: Construction of earth levees, 
concrete floodwalls, and appurtenant drainage 
structures, consisting of; About 850 feet of channel 
excavation and about 1,375 feet of earth levee along 
Phelps Creek, town of Pork Dickinson; new concrete 
wall on right bank of Chenango River, extending 
downstream from high ground near city limits to 
existing floodwall below DeForest Street, a distance of 
about 520 feet; about 150 feet of concrete wall just 
below Cutler Dam; about 180 feet of concrete wall at 
pumphouse near McDonald Avenue; raising existing 
earth levees on right bank of Chenango River, 
extending from Cutler Dam downstream for about 1, 
220 feet; about 2,915 feet of earth levee on left bank of 
Chenango River north of city limits in village of Port 
Dickinson, extending from Church Street to high 
ground just north of city line; about 3,900 feet of earth 
levee on left bank of Chenango River, extending from 
DeForest Street to Cutler Dam; new concrete 
floodwalls and riverbank revetment for about 5,570 
feet extending on left bank of Chenango River from 
Cutler Dam to junction with Susquehanna River; 
about 540 feet of new concrete floodwall and raising 
about 1,085 feet of concrete floodwall on right bank of 
Susquehanna River, extending from Delaware, 
170

BALTIMORE, MD., DISTRICT 
Lacka4 anna & Western Railroad downstream to 
Tompkins Street Bridge; about 1,940 feet of earth 
levee; about 1,940 feet of concrete floodwall; and 
capping about 125 feet of concrete floodwall, on right 
bank of Susquehanna River from Stuyvesent Street to 
mouth of Chenango River; about 8,380 feet of earth 
levee; about 2,180 feet of new concrete floodwall and 
raising about 125 feet of existing floodwall on left bank 
of Susquehanna River extending from Pierce Creek to 
high ground at Stat Highway 17; a debris dam and 
flume between Corbett and Hotchkiss Streets and a 
concrete pressure conduit, 1,060 feet long to carry flow 
of Park Creek from Vestal Avenue to Susquehanna 
River; about 665 feet of levee extending from Erie 
Railroad to high ground along right bank of 
Chamberlain Creek near the mouth; closure structures 
at Erie Railroad and at Court Street; a weir, a drop 
structure, and about 1,800 feet of earth levee, about 2, 
235 feet of channel excavation; about 645 feet of 
channel paving, and raising about 470 feet of existing 
concrete floodwall and about 200 feet of new concrete 
floodwall for improvement of Pierce Creek from its 
mouth to about 1,000 feet above Conklin Avenue; and 
appurtenant drainage structures. Improvement, 
supplemented by authorized flood control dams above 
the area, will provide protection for city of Binghamton 
against a flood discharge about 20 percent greater than 
maximum flood of record, which occurred in July 1935 
on Chenango River and in March 1936 on 
Susquehanna River. Federal cost of new work, 
completed in 1953, was $2,952,000, of which $2,844, 
682 was for construction and $107,318 was for lands 
and damages. Estimated local cost (1956) of lands and 
damages is $711,000. Local interests contributed an 
additional $163,095 for construction of improvements 
not included in authorized project. 
Elmira, N.Y.: Construction of earth levees, concrete 
floodwalls, a concrete conduit and a pumping station, 
and consists of; About 17,700 feet of earth levees, and 
about 4,100 feet of concrete floodwall on right bank of 
Chemung River, extending from South Hoffman Street 
to a point below city near upper end of Big Island; 
about 12,100 feet of earth levee and about 6,300 feet of 
concrete wall on left bank of Chemung River extending 
from Durland Avenue to Delaware, Lackawanna & 
Western Railroad at mouth of Newtown Creek; about 
10,000 feet of earth levee on right bank of Newtown 
Creek, extending from about intersection of Delaware, 
Lackawanna & Western Railroad and East Church 
Street to high ground near intersection of Sullivan and 
Warren Streets; about 4,300 feet of earth levee on right 
bank of Diven Creek; about 2,000 feet of concrete 
conduit inclosing Hoffman Brook from West Second 
Street to Chemung River; clearing islands and 
riverbanks of trees and brush for about 3.5 miles in 
Chemung River; about 14,300 feet of earth levee on left 
bank of Seely Creek, extending from Erie Railroad to 
high ground approximately 1,000 feet northwest of 
intersection of South Broadway and Pennsylvania 
Avenue; a pumping plant for disposal of interior 
drainage; an interceptor sewer about 6,000 feet long, 
varying in size from 48 to 96 inches in diameter; and 
appurtenant structures. Improvement provides 
protection for city of Elmira against a Chemung River 
discharge about equal to that of maximum flood of 
record, which occurred in May 1946. Federal cost of 
new work, completed in 1959, was $6,738,305, of which 
$6,599,130 was for construction and $139,175 was for 
lands and damages. Estimated local cost (1956) of 
lands and damages is $922,000. 
Corning, N.Y.: Flood protection for this community 
was originally authorized by Flood Control Act of 
1936. Plan of improvement provides for construction of 
a pumping station, earth levees, and concrete 
floodwalls, consisting of; About 4,300 feet of earth 
levee, enlargement of about 8,610 feet of existing earth 
levee, and about 3,100 feet of concrete floodwall on 
right bank of Chemung River, extending from Erie 
Railroad bridge to high ground at Park Avenue below 
city; about 200 feet of concrete floodwalls; about 2,500 
feet of earth levees, and enlargement of about 11,500 
feet of existing earth levee on left bank of Chemung 
and Cohocton Rivers, extending from Erie Railroad 
bridge over Cohocton River mouth of Post Creek; 
about 2,500 feet of earth levee and enlargement of 
about 4,700 feet of existing earth levee on right bank of 
Post Creek from its mouth to Watkins Street; 
realinement of about 3,000 feet of channel, about 8,800 
feet of earth levee, about 3,000 feet of channel 
excavation, a pressure conduit about 400 feet long, a 
drop structure and a weir for improvement of Cutler 
Creek, extending from its mouth to high ground at 
Deckertown Road and Hornby Road; and 
appurtenant drainage structures. Flood protection on 
Monkey Run was authorized by Flood Control Act of 
1950. Plan of improvement provides for construction of 
2,010 feet of open flume, 2,320 feet of pressure conduit, 
storm sewers and appurtenant facilities between 
existing improved channel above Sixth Street and 
Chemung River at a point immediately east of Pine 
Street East. Modified improvement will provide 
protection for city of Corning against a flood discharge 
in Chemung River approximately equal to maximum 
flood of record, which occurred in May 1946, and on 
tributary streams against floods of greater magnitude 
than known to date. Federal cost of new work, 
completed in 1956, is $3,322,000, of which $3,164,000 
is for construction and $158,000 was for lands and 
damages. Estimated local cost (1956) is $971,200, of 
which $686,471 is for lands and damages, $250,000 for 
construction of a portion of protection on Monkey 
Run, and $34,729 contributed for local work 
accomplished under Federal contract. 
Painted Post, N.Y.: Channel realinement and 
construction of earth levees and concrete floodwalls, 
consisting of; Realinement of about 6,000 feet of 
Cohocton River Channel, extending from about onehalf 
mile above State Highway Route 17 to Chemung 
171

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
River; construction of about 2,500 feet of earth levee 
and raising about 1,200 feet of existing floodwall along 
left bank of Cohocton River, extending from mouth of 
Hodgman Creek to Chemung River; about 2,900 feet 
of earth levee, and about 2,100 feet of concrete 
floodwall, extending on left bank of Hodgman Creek, 
from its mouth to high ground above State Highway 2; 
and appurtenant drainage structures. Improvement 
provides protection for village of Painted Post against a 
flood discharge approximately equal to maximum 
flood of record, which occurred in May 1946. Federal 
cost of new work, completed in 1952, was $414,181, of 
which $402,948 was for construction and $11,233 was 
for lands and damages. Estimated local cost (1956) of 
lands and damages is $50,800. 
Addison, N.Y.: Construction of earth levees and 
concrete floodwalls, consisting of; Construction of 
about 3,100 feet of earth levee and 700 feet of concrete 
floodwall on right bank of Canisteo River, extending 
from high ground on Steuben Street near Baltimore & 
Ohio Railroad to mouth of Tuscarora Creek; removal 
of existing dam, mill, and raceway from channel; 
construction of about 2,200 feet of earth levee on left 
bank of Tuscarora Creek, extending from Tuscarora 
Street to Canisteo River; construction of 4,600 feet of 
earth levee on right bank of Tuscarora Creek, 
extending from high ground at southwest edge of 
village to high ground at southeast edge of village; and 
appurtenant drainage structures. Improvement, 
supplemented by Arkport and Almond Reservoirs 
above the area, provides protection for village of 
Addison against a flood discharge on the Canisteo 
River about 28 percent greater than maximum flood of 
record, which occurred in July 1935. Protection is 
provided on Tuscarora Creek against a flood discharge 
approximately equal to maximum flood of record, 
which occurred in May 1946. Federal cost of new work, 
completed in 1952, was $827,050, of which $814,236 
was for construction and $12,814 was for lands and 
damages. Estimated local cost (1956) of lands and 
damages is $125,000. 
Bath, N.Y.: Construction of earth levees and 
concrete floodwalls along Cohocton River, consisting 
of; Construction of about 10,640 feet of earth levee and 
about 1,350 feet of concrete floodwall, extending from 
above Cameron Street to below turnout of Bath & 
Hammondsport Railroad; including about 600 feet of 
cutoff levee between Delaware, Lackawanna & 
Western Railroad and U.S. Highway 15; three stoplog 
structures across railroad tracks; a sandbag opening at 
Cameron Street; and a sill across Delaware, 
Lackawanna & Western Railroad tracks below 
Cameron Street; and appurtenant drainage structures. 
Improvement provides protection for village of Bath 
against a flood discharge approximately equal to 
maximum flood of record, which occurred in July 1935. 
Federal cost of new work, completed in 1952, was $638, 
332 for construction. Estimated local cost (1957) of 
lands and damages is $43,700. 
Avoca, N.Y.: Construction of earth levees, channel 
improvement, and channel realinement, consisting of; 
Improvement and realinement of about 8,300 feet of 
Cohocton River channel, extending from above Erie 
Railroad to below junction of Main Street and U.S. 
Highway 15; construction of about 8,500 feet of earth 
levee on left bank of Cohocton River, extending from 
high ground above Alexander Avenue to about 1,300 
feet below junction of Main Street and U.S. Highway 
15; about 4,500 feet of earth levee on right bank of 
Salmon Creek, extending from high ground above 
Alexander Avenue to Erie Railroad; a new highway 
bridge for U.S. Highway 15 over Cohocton River, 
raising of Erie Railroad bridge 4 feet; and appurtenant 
drainage structures. Improvement provides protection 
for village of Avoca against a flood discharge 
approximately double maximum flood of record, 
which occurred in July 1935. Federal cost of new work, 
completed in 1952, was $436,374, of which $406,589 
was for construction and $29,785 was for lands and 
damages. Estimated local cost (1953) of lands and 
damages is $69,300. 
Canisteo, N.Y.: Construction of earth levees, 
consisting of; About 8,000 feet of earth levees on right 
bank of Canisteo River, extending from high ground 1, 
570 feet west of State Highway Route 21 above village 
to a point at intersection of Ordway Lane and East 
Main Street; about 7,400 feet of earth levee on left 
bank of Purdy and Bennett Creeks, extending from 
Main Street Bridge to high ground above Greenwood 
Street; 1,000 feet of earth levee on right bank of 
Bennett Creek, extending upstream from Main Street 
Bridge; a concrete check dam with wing levees from 
Greenwood Street; a new highway bridge at 
Greenwood Street; alterations to existing timber check 
dams in Bennett Creek; channel excavation in Bennett 
and Purdy Creeks; and appurtenant drainage 
structures. Improvement supplemented by Arkport 
and Almond Reservoirs above the village, provides 
protection for village of Canisteo against a flood 
discharge about 30 percent greater on Canisteo River 
than maximum flood of record, and on Bennett and 
Purdy Creeks the channel capacity will be 
approximately equal to discharge of maximum flood of 
record which occurred in July 1935. Federal cost of new 
work completed in 1965 was $1,183,111, of which $1, 
125,750 was for construction and $57,361 was for lands 
and damages. Estimated local cost (1957) of lands and 
damages, is $35,000. 
Hornell, N.Y.: Channel realinement and 
construction of earth levees, concrete floodwalls, and 
check dams consisting of; Realinement of about 4,600 
feet of Canisteo River channel, and about 5,800 feet of 
earth levee on its right bank, extending from Seneca 
Street upstream to junction of Pittsburgh, Shawmut & 
Northern Railroad and Erie Railroad; construction of 
about 4,500 feet of earth levee, extendingon both sides 
of Seneca Street from Canisteo River to Wrightman 
Avenue and junction of Cleveland Avenue and 
172

BALTIMORE, MD., DISTRICT 
Bethesda Drive; construction of about 7,200 feet of 
earth levee, about 2,500 feet of concrete floodwall, and 
raising about 1,500 feet of existing concrete floodwall, 
on right bank of Canisteo River, and about 12,000 feet 
of channel improvement, extending from Seneca Street 
to Erie Railroad; construction of about 2,500 feet of 
earth levee, about 2,100 feet of concrete floodwall on 
left bank of Canisteo River, extending from a point 
opposite Walnut Street to Erie Railroad; a ring-earth 
levee about 2,800 feet long around sewage-disposal 
plant on left bank of Canisteo River; about 4,500 feet of 
realinement and improvement of Canisteo River 
channel, with about 4,500 feet of earth levee on its right 
bank, extending from Cedar Street downstream to 
about 1,400 feet above East Avenue; about 2,400 feet of 
channel paving, 1,400 feet of earth levee, raising about 
1,900 feet of concrete floodwall, and construction of one 
check dam on Canacadea Creek; about 1,600 feet of 
channel paving and construction of three check dams 
on Chauncey Run with about 300 feet of new wall and 
about 300 feet of capping; a weir, a check dam, 3,030 
feet of channel paving 4,800 feet of floodwalls and 
levees, and related work on existing walls, all on Crosby 
Creek; removal of 6 bridges, erection of 4 bridges, 
miscellaneous bridge structures, and 3 drop structures; 
and appurtenant drainage structures and small stream 
control works. 
Improvement, supplemented by Arkport and 
Almond Reservoirs above the area, provides protection 
for city of Hornell against a flood discharge 
approximately double maximum flood of record, 
which occurred in July 1935. Federal cost of new work 
completed in 1960 was $4,558,698, of which $3,993,452 
was for construction and $565,246 was for lands and 
damages. Local interests raised or reconstructed three 
bridges over improvement and contributed $15,000 
towards reconstruction of a fourth bridge. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. East Sidney 
Reservoir, N. Y.: 
Normal operation and maintenance of project 
continued, by hired labor, for $69,205. 
Whitney Point Reservoir, N. Y.: New Work: Plans 
and specifications for the final portion of the access 
road to Lisle Site, Area No. 3, were completed. Costs 
were $972. Maintenance: Normal operation and 
maintenance of project continued, by hired labor, for 
$93,946. 
Arkport Reservoir, N. Y.: Normal operation and 
maintenance of project continued, by hired labor, for 
$26,401. 
Almond Reservoir, N. Y.: Normal operation and 
maintenance of project continued, by hired labor, for 
$57,530. 
Oxford, N. Y.: Normal operation and maintenance 
of project continued, by hired labor, for $5,053. 
Lisle, N. Y.: Normal operation and maintenance of 
project continued, by hired labor, for $7,527. 
Whitney Point (Village), N. Y.: Normal operation 
and maintenance of project continued, by hired labor, 
for $5,480. 
Binghamton, N. Y.: Normal operation and 
maintenance of project continued, by hired labor, for 
$11,173. 
Elmira, N. Y.: Normal operation and maintenance 
of project continued, by hired labor, for $3,223. 
Corning, N. Y. (original project): Normal operation 
and maintenance of project continued, by hired labor, 
for $13,423. 
Painted Post, N. Y.: None. 
Addison, N. Y.: Normal operation and maintenance 
of project continued, by hired labor, for $988. 
Avoca, N. Y.: Normal operation and maintenance of 
project continued, by hired labor, for $8,612. 
Canisteo, N. Y.: Normal operation and maintenance 
of project continued, by hired labor, for $10,905. 
Hornell, N. Y.: Maintenance: Normal operation 
and maintenance of project continued, by hired labor, 
for $34,048. 
Federal maintenance responsibilities were carried 
out as required. Local interests, where required, carried 
out maintenance responsibilities in accordance with 
flood control regulations prescribed by Secretary of the 
Army and explanatory instructions contained in 
respective operation and maintenance manuals. 
Condition at end offiscalyear. Project is about 50 percent 
complete, exclusive of Susquehanna River project and 
Stillwater, Genegantslet, and South Plymouth 
Reservoirs. The Susquehanna River project, consisting 
of two local protection projects in New York, and two 
reservoirs and one local protection project in 
Pennsylvania, was authorized by 1958 Flood Control 
Act; and Genegantslet and South Plymouth Reservoirs 
in New York and Stillwater Reservoir in Pennsylvania 
were authorized by 1944 Flood Control Act. These 
projects supplement comprehensive flood control 
program for southern New York and northern and 
eastern Pennsylvania, and are reported separately. 
(See Table 4-H at end of chapter for cost of new work 
and maintenance to June 30, 1970, and percentage of 
construction of new work completed for each project 
unit.) 
Work remaining to complete existing project is 
completion of engineering studies, design and 
preparation of plans, and construction of remaining 
project units comprising Davenport Center, West 
Oneonta, and Copes Corner Reservoirs. 
41. STILLWATER RESERVOIR, 
LACKAWANNA RIVER, PA. 
Location. Dam is on Lackawanna River, 39 miles 
from mouth of stream and about 4 miles upstream from 
Forest City, Susquehanna County, Pa. (See Geological 
Survey Quadrangle sheet, "Honesdale, Pa.") 
173 
451-584 0-72-12

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Existing project. Dam is earthfill type, rising 77 feet 
above streambed, with a controlled outlet conduit and 
side channel spillway in left abutment. Reservoir 
capacity is 12,000 acre-feet, of which 11,600 acre-feet is 
flood control storage and remainder utilized to 
maintain existing water-supply reservoir for Forest 
City, Pa., at this site. Reservoir area is 422 acres, and 
pool extends about 2.1 miles upstream. Reservoir 
controls 52 percent of watershed above Carbondale, 26 
percent above Olyphant, and 17 percent above 
Scranton. Federal cost of new work, completed in 1965, 
was $5,725,700 of which $4,500,500 was for 
construction and $1,225,200 was for lands and 
damages. 
Local cooperation. None required. Section 2, Flood 
Control Act of June 28, 1938, applies. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance were performed 
by hired labor. 
Condition at end of fiscal year. Construction of project 
was completed in 1964. 
42. SUSQUEHANNA RIVER FLOOD 
CONTROL PROJECTS, N. Y. AND PA. 
Location. In upper watershed of Susquehanna River 
to and including Chemung River. This includes about 
6,050 square miles in south-central New York, and 
about 1,480 square miles in northern Pennsylvania. 
Individual units constituting authorized plan are on 
Tioga and Cowanesque Rivers (tributaries of 
Chemung River), on Tioughnioga River, and on 
Susquehanna River near its junction with Chemung 
River. (See Geological Survey index maps of New York 
and Pennsylvania.) 
Existing project. Provides for construction of 
Cowanesque Lake and Tioga-Hammond Lakes in 
Pennsylvania, local flood protection works at Elkland, 
Pa., and Nichols, N. Y., channel improvements at 
Cortland, N' Y' This project plan supplemented the 
comprehensive flood-control program for southern 
New York and northern Pennsylvania which included 
Southern New York flood control project and 
Stillwater, Genegantslet, and South Plymouth 
Reservoirs. Individual units which constitute approved 
plan of improvement authorized by 1958 Flood 
Control Act are described in following paragraphs; 
Lake Cowanesque: Will be on Cowanesque River, 
dam to be about 2 miles above confluence with Tioga 
River at Lawrenceville, Pa., about 12 miles south of 
Corning, N.Y. Dam will be earth fill, 3,100 feet long 
and rising 151 feet above streambed, with an 
uncontrolled spillway in right abutment and a gated 
outlet conduit in valley floor. Flood control storage 
would be 82,000 acre-feet, equivalent to 5.6 inches of 
runoff from drainage area. Estimated Federal cost 
(1970) of new work is $46,600,000, of which $28,700, 
000 is for construction and $17,900,000 for lands and 
damages. (Map references; Geological Survey, Tioga, 
Pa., quadrangle; Army Map Service, series V831, sheet 
5567 1 NW.) 
Tioga-Hammond Lakes: Will be near junction of 
Crooked Creek and Tioga River at Tioga, Pa., about 
18 miles south of Corning, N.Y. Tioga Dam will be on 
Tioga River and Hammond Dam on Crooked Creek, 
with an interconnecting diversion channel. Both dams 
will be earthfill construction. Tioga Dam will be 2,600 
feet long, rising 140 feet above streambed, with a 
controlled outlet conduit. Hammond Dam will be 5, 
900 feet long, a maximum height of 121.5 feet above 
streambed, with a concrete spillway. The Tioga- 
Hammond Lakes project will provide a flood control 
storage capacity 106,750 acre-feet. Estimated Federal 
cost of new work is $88,200,000 (July 1970), of which 
$53,240,000 is for construction and $34,960,000 for 
lands and damages. (Map references; Geological 
Survey, Tioga, Pa. quadrangle; Army Map Service, 
series V831, sheet 5567 1 NW.) 
Cortland, N.Y.: In City of Cortland on Tioughnioga 
River, a tributary of Chenango River, which joins 
Susquehanna River at Binghamton, N.Y. It provides 
channel improvement and clearing for reduction of 
flood heights at Cortland, by improvement of about 6, 
000 feet of channel of Tioughnioga River and about 8, 
400 feet of channel of West Branch of Tioughnioga 
River above its confluence with the river. Federal cost 
of new work for completed project was $324,486. 
Estimated cost to local interests was $51,300 for lands 
and damages. (Map references; Geological Survey, 
Cortland, N.Y., quadrangle; Army Map Service, series 
V821, sheet 5769 11 SW.) 
Nichols, N.Y.: Project is at Nichols, N.Y., at junction 
of Wappasening Creek with Susquehanna River about 
16 miles upstream from mouth of Chemung River. 
Project provides for levee and appurtenant 
improvements for local flood protection at Nichols 
extending for about 9,300 feet along Wappasening 
Creek and Susquehanna River. Estimated Federal cost 
of new work is $1,550,000 (July 1970), exclusive of land 
and other work to be provided by local interests at an 
estimated cost of $270,000 (July 1970). (Map 
reference; Geological Survey, Owego quadrangle.) 
Elkland, Pa.: Project is on Cowanesque River about 
12 miles above its confluence with Tioga River. Project 
provides for levee and appurtenant improvements for 
local flood protection at Elkland. Levee would extend 
about 14,000 feet along left bank of river. Estimated 
Federal cost for new work is $1,300,000 (July 1969), 
exclusive of land and other work to be provided by 
local interests at an estimated cost of $228,000 (July 
1968). (Map references; Geological Survey, Elkland 
quadrangle; Army Map Service, series V831, sheet 
5567 IV NE.) 
Local cooperation. None required for reservoirs. For 
local protection projects, local interests must furnish 
lands and rights-of-way for construction including 
areas required for borrow, clearing, spoil, ponding, and 
floodways; make road, street, and utility changes 
174

BALTIMORE, MD., DISTRICT 
required by improvements; hold the United States free 
from damages; maintain and operate all works 
including ponding areas and clearings; and protect 
channels and floodways from future encroachments 
that would reduce their flood-carrying capacity. 
Formal assurances of local cooperation, for Nichols, 
N.Y., project, were executed by the State of New York, 
and accepted on March 2, 1967. Formal assurances of 
local cooperation, dated September 11, 1962, were 
received from Elkland Borough Council. 
Operations and results during fiscal year. Lake 
Cowanesque, Pa.: Feature design memoranda, by 
hired labor, were continued. Costs, all for new work, 
were $196,274. 
Tioga-Hammond Lakes, Pa.: Feature design 
memoranda were continued, by hired labor. Plans and 
Specifications for (Phase I) railroad relocation, 
Crooked Creek Valley, and stripping left abutment of 
dam are 75 percent complete. Land acquisition 
continued. Costs, all for new work, were $1,014,864. 
Nichols, N. Y.: Contract bids were opened in May 
1970. Funds held in budgetary reserve, however, 
prevented award of the contract during the fiscal year. 
Costs, all for new work, were $1,317. 
Elkland, Pa.: Estimates of final quantities and 
preparation of record drawings, by hired labor, were 
completed. Final payment was made in December 
1969. Costs, all for new work, were $14,533. 
Condition at end of fiscalyear. Construction of Cortland, 
N. Y., local protection project was completed October 
1963. Bids for construction of Nichols, N. Y., local 
protection project were opened on 13 May 1970 and 
the contract is scheduled for award in July 1970. 
Construction at Elkland, Pa., local protection project 
was completed in December 1966. Advance 
engineering and design of Lake Cowanesque project is 
in progress. Preconstruction planning of the Tioga- 
Hammond Lakes project is essentially complete. 
Work remaining is completion of engineering and 
design, preparation of contract plans and 
specifications, and construction of remaining units. 
43. TYRONE, PA. 
Location. On left bank of Little Juniata River, 15 
miles above its confluence with Frankstown Branch, 
and 116 miles above mouth of Juniata River. Bald 
Eagle Creek, Sink Run, and Schell Run, draining 53, 7 
and 2 square miles, respectively, flow through the city. 
(See Geological Survey quadrangle sheet, "Tyrone, 
Pa.") 
Existing project. Plan of improvement for Little 
Juniata River will consist of levees and walls along left 
bank, a drop structure, channel improvements in river, 
and protection of bridges. Channel improvements on 
Bald Eagle Creek will consist of new levee and wall on 
right bank, concrete overflow dam, concrete flume, and 
stilling basin. Sink Run will be diverted to Schell Run 
watershed about a mile upstream from the borough. 
Improvements for Schell Run will consist of a conduit 
with intake structure and a debris basin at the 
upstream end, and a stilling basin at the downstream 
end. Improvement will provide protection for borough 
of Tyrone against a flood discharge equal to maximum 
flood of record, which occurred in March 1936. 
Estimated Federal and local costs (1970) are $14,600, 
000 and $880,000, respectively. 
Local cooperation. Local interests must furnish lands, 
and rights-of-way necessary for construction of project, 
hold the United States free from damages due to 
construction works, and maintain and operate all 
works after completion in accordance with regulations 
prescribed by the Secretary of the Army. A Resolution 
of Assurances of local cooperation was enacted by the 
Borough Council of Tyrone on January 12, 1967 and 
approved by the President of the Borough Council and 
the Mayor of Tyrone on January 13, 1967. The 
resolution was reviewed for adequacy and formally 
accepted by the District Engineer on January 27, 1967. 
Operations and results during fiscal year. Revisions to the 
General Design Memorandum were completed. The 
Sink Run Diversion and Schell Run design 
memorandum was completed and plans and 
specifications were initiated. 
Condition at end of fiscal year. Remaining work is 
completion of preconstruction planning, land 
acquisition, and construction of project. 
44. UNADILLA, N.Y. 
Location. On north bank of Susquehanna River in 
Otesgo County, N.Y., about one-half mile northeast of 
Binghamton, N.Y. (See Geological Survey 
Quadrangle, Unadilla, N.Y.) 
Existing project. Provides for a rectangular concrete 
channel 3,284 feet long with a debris basin and 
concrete weir at upstream end and a flip bucket type 
energy dissipater at downstream end. Improvement is 
on that portion of Martin Brook flowing through 
Unadilla. New bridges will be provided for Martin 
Brook Road, Weidman Street, and Teller Street. 
Delaware and Hudson Railroad bridge will be 
modified. Estimated Federal cost for new work is $1, 
000,000. Estimated cost to local interests is $432,003, of 
which $261,353 are contributed funds and $170,650 
are local costs. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. 
Operations and results during fiscal year. New work: 
Contract modifications were processed and final 
payment was made inJune 1970. 
Condition at end of fiscal year. Construction began in 
August 1967 and was completed May 1969. The 
project was turned over to the State of New York 
Conservation Department for operation and 
maintenance on June 13, 1969. 
175

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
45. WEST BRANCH OF SUSQUEHANNA 
RIVER, PA. 
Location. A system of three flood control reservoirs in 
headwaters of West Branch Susquehanna River, 
Pennsylvania. The reservoirs, to be known as 
Curwensville, Alvin R. Bush, formerly known as Kettle 
Creek, and Foster Joseph Sayers formerly known as 
Blanchard, are on West Branch about 2.5 miles 
upstream from Curwensville, Pa; on Kettle Creek 8.4 
miles above the mouth and 16 miles upstream from 
Renovo, Pa.; and on Bald Eagle Creek about 1 mile 
upstream from Blanchard, Pa.; respectively. (See 
Geological Survey Quadrangle sheets, "Curwensville, 
Pa."; "Keating, Pa."; and "Howard, Pa."; 
respectively.) 
Existing project. Three reservoirs for flood control, 
each with a storage capacity equal to 6 inches of runoff 
from controlled drainage area, and each having a small 
conservation pool to control debris. Curwensville Dam 
is an earth fill structure with spillway in a saddle in left 
abutment and concrete outlet works through earth fill 
portion. Alvin R. Bush Dam is an earth fill structure 
with spillway and outlet tunnel in right bank. Foster 
Joseph Sayers Dam is a rolled earth fill structure with a 
single outlet conduit on rock in left abutment and a 
concrete spillway in a saddle adjacent to left abutment. 
Estimated Federal cost (1970) for new work is $57,669, 
060 of which $33,922,220 is for construction and $23, 
746,840 for lands and damages. Estimated annual cost 
for maintenance, operation, and replacements is $102, 
000. (See Table 4-I at end of chapter for additional 
information on individual units of project.) 
Local cooperation. Commonwealth of Pennsylvania 
must furnish assurances satisfactory to the Secretary of 
the Army that it will coordinate operation of George B. 
Stevenson Reservoir, formerly known as First Fork 
Reservoir, with operation of Curwensville, Alvin R. 
Bush, and Blanchard Reservoirs, when constructed, to 
secure optimum flood control benefits from system 
operation. George B. Stevenson Reservoir on First Fort 
Sinnemahoning Creek in Cameron and Potter 
Counties, Pa., was constructed by Commonwealth of 
Pennsylvania at a first cost of $12,240,000 and an 
estimated $30,000 annually for operation and 
maintenance. 
Operations and results during fiscal year. Curwensville 
Reservoir: Plans and specifications for stilling basin 
riprap were completed by hired labor. Installation of a 
permanent downstream drainage system, by contract, 
began on October 25, 1968, and was completed in 
August 1969. Costs for new work were $21,177. Normal 
operation and maintenance of project continued by 
hired labor. Costs for maintenance were $74,747. 
Alvin R. Bush Reservoir: Maintenance: Normal 
operation and maintenance of project continued by 
hired labor. Costs for maintenance were $56,874. 
Foster Joseph Sayers Dam: New Work: 
Construction of the dam and appurtenances (excluding 
the outlet works gate structure) began in May 1966 and 
was accepted as operationally complete on July 8, 
1969. Construction of the outlet works gate structure 
began in March 1967 and is 99 percent complete. 
Construction of sanitary systems for public use began in 
June 1969 and is 60 percent complete. A contract for 
public use and access facilities was awarded June 30, 
1970. Preparation of the operation and maintenance 
manual and master plan, by hired labor, is 90 and 30 
percent complete, respectively. Costs for new work 
were $1,654,654. Maintenance: Normal operation and 
maintenance of project continued by hired labor. Costs 
for maintenance were $48,696. 
Condition at end of fiscal year. Curwensville Reservoir: 
Construction of project began May 1962, and has been 
in useful operation since November 1965. Work 
remaining is stilling basin riprap and channel 
rectification. Costs were $20,620,832 of which $20,381, 
516 was for new work and $239,316 for maintenence. 
Alvin R. Bush Reservoir: Construction of project 
began May 1959 and is complete. Dam was placed in 
beneficial use February 1962. Costs were $7,505,503 of 
which $7,103,000 was for new work and $402,503 for 
maintenance. 
Foster Joseph Sayers Dam: Construction of project 
began in March 1965 and is 91 percent complete. Dam 
was accepted as operationally complete on July 8, 
1969. Work remaining is completion of construction of 
remaining features of project. Costs were $27,398,908 
of which $27,350,212 was for new work and $48,696 
was for maintenance. 
46. YORK, CODORUS CREEK, PA. 
Location. On Codorus Creek 10 miles above its 
confluence with main Susquehanna River. Codorus 
Creek with its tributary branches is in York county in 
south and central parts of Pennsylvania. (See 
Geological Survey Quadrangle sheets, "Pennsylvania- 
York and Hanover.") 
Existing project. Construction of Indian Rock Dam, an 
earth and rockfill dam about 1,000 feet long at top, 
rising 83 feet above streambed, with a reservoir 
providing for controlled storage of 28,000 acre-feet at 
elevation of spillway crest. Dam is on main branch of 
Codorus Creek about 3 miles above York. Outlet works 
are in right abutment and uncontrolled spillway is on 
right bank, discharging upstream from tunnel outlet. 
Reservoir will control entire drainage area of main 
branch of Codorus Creek and 41 percent of drainage 
area above York. Plan also provides for improvements 
to Codorus Creek channel in vicinity of and through 
city of York for about 22,969 feet extending from 300 
feet above Richland Avenue to a point downstream 
from Pennsylvania Railroad crossing known as Black 
Bridge. Improvements, which will increase channel 
capacity to 24,000 cubic feet per second, include 
widening and deepening channel, constructing bank 
protection, removing York Roller Mill Dam, and 
176

BALTIMORE, MD., DISTRICT 
construction of a low water channel about 3,900 feet 
long in vicinity of York Roller Mill Dam. 
Improvement will provide protection for city of York 
against a flood discharge about 33 percent greater than 
maximum flood of record which occurred in August 
1933. Cost of new work for completed project was $5, 
061,167, of which $4,566,446 (regular funds) and $11, 
588 (emergency relief funds) was for construction and 
$483,133 (regular funds) for lands and damages. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies. 
Operations and results during fiscal year. Remedial work 
in connection with periodic inspections and normal 
operation and maintenance of project continued, by 
hired labor. 
Condition at end of fiscalyear. Project was operationally 
complete in November 1947 and remaining 
construction features were completed in September 
1962 and November 1955. 
47. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Projects in New York, Pennsylvania, Maryland, 
District of Columbia, and Virginia, were inspected 
during fiscal year by hired labor at a cost of $41,306, all 
for maintenance. 
48. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Operations and results during fiscal year. Studies to 
develop and prescribe regulations for operation for 
flood control of George B. Stevenson Reservoir 
(formerly known as First Fork Reservoir) and to 
coordinate this reservoir with West Branch 
Susquehanna River reservoir system continued. Costs, 
all for maintenance, were $2,175. 
Condition at end of fiscal year. Studies in connection with 
scheduling flood control reservoir regulations are in 
progress. Total costs, all for maintenance, were $69, 
490. 
49. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 4-J at end of Chapter.) 
50. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency flood control activities-repair, flood 
fighting, and rescue work (Public Law 99, 84th 
Congress, and antecedent legislation) Federal costs for 
fiscal year were $28,717 for advance preparation. 
Flood control activities pursuant to Section 205, 
Public Law 685, 84th Congress, as amended 
(preauthorization). 
Fiscal year costs for Anacostia River and 
Tributaries, Prince Georges County, Maryland, were 
$2,280. 
GENERAL INVESTIGATIONS 
51. SURVEYS 
Cost for fiscal year was $964,431, of which $18,720 
was for navigation studies, $78,000 for flood control 
studies, $157,270 for special studies, $668,550 for 
comprehensive basin study, $22,896 for beach erosion 
development study, $4,995 for soil conservation studies, 
and $14,000 for other coordination studies. 
52. COLLECTION AND STUDY OF BASIC 
DATA 
Cost for flood plain information studies during the 
fiscal year was $205,338. Gathering existing hydrologic 
and hydraulic data, and development of new flood 
data, for presentation in a form usable to guide local 
interests in planning decisions on flood plain use, were 
in progress at end of fiscal year. (See Table 4-K at end 
of Chapter.) 
53. MAINTENANCE, OPERATION, AND 
CAPITAL OUTLAY OF THE 
WASHINGTON AQUEDUCT 
Location. Diversion dam and raw-water supply 
intakes are on the Potomac River at Great Falls 13.5 
miles northwest of Washington, D. C.; the two 
collecting conduits, part of Dalecarlia receiving 
reservoir, and booster pumping plant that lifts water 
from forebay to main body of Dalecarlia reservoir and 
Little Falls raw-water supply works are in Maryland; 
and all other structures of water supply system 
including part of raw-water collecting system, 
purification plants, pumping stations, storage 
reservoirs, and transmission mains are in the District of 
Columbia (See U. S. Geological quadrangle, 
Washington and Vicinity). 
Control of the water supply system is vested in Chief 
of Engineers (See acts of March 3, 1859, and March 2, 
1867, and Sec. 1800 of Revised Statutes). 
Existing Project. Provides for Administration, 
Operation, Maintenance, and protection of watersupply 
system facilities and reservations including 
collection, purification, pumping, transmission, storage 
facilities, and Federal Water mains; and planning and 
construction of increased supply facilities (See Annual 
Report for 1962 for authorization). 
Public Law 378, 64th Congress, of March 3, 1917; 
Public Law 119, 69th Congress, approved April 14, 
1926; and Public Law 118, 80th Congress, June 26, 
1947, authorized supplying water to adjacent 
Maryland areas, Arlington County, Virginia, and Falls 
Church, Virginia, respectively. 
For description of District of Columbia water supply 
system and of previous capital-improvement and 
177

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
operation-and-maintenance projects see Annual 
Report for 1930, information pamphlet published June 
1939 and revised December 1950, and House 
Document 480, 79th Congress, 2nd Session. 
Local cooperation. Prior to July 1, 1880, expenses of 
Washington Aqueduct for construction, operation, and 
maintenance were paid wholly out of revenues of the 
United States. From July 1, 1880, to June 30, 1882, 
expenses of operation and maintenance were paid onehalf 
by the United States and the other half out of 
general revenues of the District of Columbia. From 
July 1, 1882, to June 30, 1898, one-half of construction 
costs were charged to a capital account on the books of 
the Treasury to be repaid by the District of Columbia 
from water rents with 3 percent interest. From July 1, 
1898, to June 30, 1916, expenses of construction, 
operation, and maintenance were paid one-half from 
surplus general revenues of the District of Columbia 
and one-half from the United States Treasury. From 
July 1, 1916, to June 30, 1927, expenses of construction 
were paid 60 percent out of general revenues of the 
District of Columbia and 40 percent by the United 
States. From July 1, 1927, to date, all expenses for 
construction have been paid out of water revenues of 
the District of Columbia. From July 1, 1916, to date, 
expenses of operation and maintenance have been paid 
wholly out of water revenues of the District of 
Columbia. From April 1953, to June 30, 1970, $29,300, 
000 was borrowed from the United States Treasury, in 
installments, to finance expansion and improvement of 
the District of Columbia water system as authorized by 
Public Law 533, 81st Congress, 2nd Session, of June 2, 
1950, as amended by Public Law 364, 83rd Congress, 
2nd Session, of May 18, 1954. 
Public Law 280, 66th Congress, 2nd Session, of June 
10, 1920, appropriated $25,000 wholly from United 
States revenues to prepare, among other things, a 
report to assure an increased and adequate water 
supply for the District of Columbia. This "Tyler" 
report was the basis for improvements constructed from 
1922 to 1927. Included in the District of Columbia 
appropriation acts of 1941 and 1942, $40,000 was 
appropriated from the water fund, District of 
Columbia, for preparation of a report "for the 
development of a plan to insure an adequate future 
water supply for the District of Columbia." This report, 
published as House Document 480, 79th Congress, 2nd 
Session, contains comprehensive plan and program for 
improvements and additions to the water system. 
Annually, since July 1, 1920, on a percentage basis 
and, since July 1, 1924, on a lump-sum basis, the 
United States has contributed to support of the District 
of Columbia but, prior to July 1, 1947, no part of such 
annual percentage or lump-sum contribution has been 
allocated to the water fund, District of Columbia. 
From fiscal year 1948 through June 30, 1954, 
pursuant to Public Law 195, 80th Congress, 1st Session, 
an annual $1,000,000 was authorized for water 
consumed by the Federal Government. Public Law 
364, 83rd Congress, 2nd Session, which is known as the 
"District of Columbia Public Works Act of 1954," 
provided payment by the United States for all water 
and water services furnished, and increased authority 
for borrowing. 
Public Law 533, 81st Congress, 2nd Session, 
authorized the Secretary of the Treasury to lend, with a 
limit of $23,000,000, to the Commissioners of the 
District of Columbia such sums as may hereafter be 
appropriated to finance expansion and improvement of 
the water system when sufficient funds therefor are not 
available from the District of Columbia Water Fund 
established by law (D. C. code 1940 edition, title 1943, 
ch 15). Above public law was amended by Public Law 
364, 83rd Congress, 2nd Session, by striking the figure 
"23,000,000" and inserting in lieu thereof the figures 
"35,000,000." 
Operation and Results During the Fiscal Year. An 
uninterrupted and adequate supply of purified water 
was furnished to the District of Columbia; Arlington 
County, and Falls Church, Va.; and Federal 
establishments in Arlington County, Va., and 
Montgomery and Prince Georges County, Md. Total 
consumption for the year was 70,484 million gallons; 
the maximum daily consumption was 277.9 million 
gallons and average daily consumption was 193.1 
million gallons. Based on estimated average number of 
consumers of 954,000 in the District of Columbia and 
266,000 in Arlington County and Falls Church and 
Fairfax County, Va., average per capita daily 
consumption was 158.3 gallons. Average daily 
consumption in the District of Columbia alone was 
158.5 million gallons or an average per capita daily 
consumption of 166 gallons. Average daily amount of 
water furnished to Arlington County, Fairfax County, 
and Falls Church, Va., was 34.5 million gallons or an 
average per capita daily consumption of 130 gallons. 
The Water Fund, D. C., was reimbursed $1,309,410 for 
supply of water furnished Virginia communities. An 
average of 163,000 gallons per day was delivered to 
Maryland communities during fiscal year 1970 by the 
Water Division, D. C., through connections to the 
Washington Suburban Sanitary Commission's system. 
On June 23, 1952, fluoridation equipment was put in 
service and application of sodium silicofluoride started 
and continued through February 1964 when the use of 
Hydro-Fluosilicic acid was started. 
Average turbidity of raw water from the Potomac 
River was reduced from 72 to 0.2 parts per million or 
"Jackson Units." Analyses were made for coliform 
bacteria on 146,340 tubes of Lactose broth inoculated 
with water taken from 208 sampling points in the 
collection, purification, and distribution systems. 
Approximately 120,212 physical and chemical tests 
were made on 13,570 water samples from the supply 
and distribution system. After sterilization of the filter 
effluent, average Most Probable Number of coliform 
bacteria per 100 milliliters was found to be .15 at 
Dalecarlia and .20 at the McMillian filter plant. 
178

BALTIMORE, MD., DISTRICT 
Average calcium carbonate alkalinity of the filtered 
water was 65 P.P.M. and the average pH value was 7.8 
from Dalecarlia filter plant, and 60 and 7.9 
respectively, from McMillan filter plant. Average 
hardness was 125 P.P.M. from Dalecarlia and 121 
P.P.M. from McMillan. Flourine content of 4,270 
water samples was determined. 
In fiscal year 1970, direct operating cost of water 
treated and delivered to system per million gallons was 
$56.80 as compared with cost of $52.15 per million 
gallons in fiscal year 1969. 
Visitors. During the year 1,104 persons were 
conducted through water treatment and pumping 
plants and bacteriological and chemical laboratories of 
which 1,095 were engineering and science students, 
public school pupils, civic groups, and public officials, 9 
foreign visitors. 
Control. All funds were expended in conformity with 
the legislative provision contained in the annual 
appropriation act which is as follows; 
"Nothing herein shall be construed as affecting the 
superintendence and control of the Secretary of the 
Army over the Washington Aqueduct, its rights 
appurtenances, and fixtures connected with the same, 
and over appropriations and expenditures therfor as 
now provided by law." 
Condition at end of fiscal year. Intakes, conduits, 
reservoirs, filter plants, pumping stations, mechanical 
equipment, and structures were in good condition 
generally. Deep cleaning of the filters at McMillan 
Reservation will be resumed when conditions warrant 
it. During maximum demand periods, the Little Falls 
raw-water pumping station was operated to augment 
raw-water supply of gravity-flow conduits. 
Construction work authorized with "no year" funds 
not previously reported as completed was as follows; 
Continuing utility relocations and system 
interconnections, 95 percent; repairs to roadways and 
landscaping, 60 percent; new shops and storehouses, 
Dalecarlia, 25 percent; new office facility, Dalecarlia, 
100 percent; Great Falls intake structure, 99 percent; 
flood and water quality protection Dalecarlia 60 
percent. 
Funds are being requested in the FY 1972 budget for 
planning for a rapid-sand type filter plant at 
McMillan. 
The feasibility of building a raw-water pumping 
station on the Potomac River estuary, to provide a 
limited supplementary raw-water supply until 
adequate fresh water storage could be provided 
upstream on the Potomac River has been investigated. 
Funds for such a project will require authorization by 
Congress. 
179

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
1. Baltimore Harbor and New Work 
Channels, Md. Approp. 
Cost 
Maint. 
Approp. 
Cost 
2. Baltimore Harbor, Md. Maint. 
Collection and Approp. 
Removal of Drift Cost 
3. Bonum Creek, Va. New Work 
(Federal Funds) Approp. 
Cost 
Maint. 
Approp. 
Cost 
(Contributed Funds) New Work 
Contrib. 
Cost 
4. Cambridge Harbor, Md. New Work 
Approp. 
Cost 
5. Chester River, Md. 
6. Choptank River, Md. 
7. Cuckold Creek, Md. 
8. Harbor of Baltimore 
Md. Prevention of 
Obstructions and 
Injurious Deposits 
9. Herring Bay and 
Rockhold Creek, Md. 
10. Honga River and Tar 
Bay (Barren Island 
Gaps), Md. 
11. Island Creek, St. 
George's Island, Md. 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
$ 50,0001 $ 2 
323,1184 420,1525 
277,100 578,4796 
509,457 587,0686 
45,000 
44,978 
200,000 
5,999 
45,000 
44,994 
188,036 
$ 234,000 
142,454 
1,250,3577 
1,250,361 
55,000 
55,782 
$ -100,000 $ 3 7 ,4 0 6 ,8 1 6 
j 
9,451 37,394,5563 
860,0118 14,267,0889',10 
859,299 14,266,0499'10 
90,091 
51,857 
-4,000 
7,041 
19,010 
1,068 
4,200 
978,697 
940,406 
202,000 
202,000 
19,010 
1,068 
-202 
3,998 
3,998 
3,998 
5,000 
4,789 
34,700 
31,973 
10,000 
4,000 
660 
160,000 
161,799 
11,000 
1,252 
165,000 
167,406 
2,727 
1,042 
415 
165,000 
164,872 
43,750 
2,890 
26,250 
6,083 
101,740 
10,871 
195,97411 
195,97411 
17,116 
16,905 
70,49512 
70,49512 
340,797 
249,928 
94,296 
85,343 
57,175 
57,175 
-9,780 
2,889 
166,253 
165,232 
40,860 
20,167 
5,220 
5,216 
1,629,953 
1,628,700 
50,591 
50,591 
89,724 
89,724 
66,11913 
66,11913 
251,499 
251,499 
23,836 
23,836 
180 
TABLE 4-A

TABLE 4-A (Continued) 
BALTIMORE, MD., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
12. Little Wicomico 
River, Va. 
13. Lower Thorofare, 
Deal Island, Md. 
14. Lowes Wharf, Md. 
15. Nanticoke River, Md. 
16. Ocean City Harbor 
and Inlet and 
Sinepuxent Bay, Md. 
17. Pocomoke River, Md. 
18. Potomac and 
Anacostia Rivers, 
D.C., Collection and 
Removal of Drift 
19. Potomac River and 
Tributaries at and 
Below Washington, 
D.C., Elimination of 
Waterchestnut 
20. Rhodes Point to 
Tylerton, Md. 
21. St. Jeromes Creek, 
Md. 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
-4,300 
23,319 
80,400 
75,333 
22,000 
1,822 
7,817 
47,244 
7,800 
6,031 
63,011 
115,000 
100,405 
5,000 
3,703 
117,500 175,000 
127,580 177,345 
2,105 
6,000 
3,000 
2,624 
1,078 
181 
$ 25,020 
877 
67,170 
31,686 
63,035 
2,760 
32,047 
2,429 
46,057 
3,890 
$ 47,764 
23,621 
81,88514 
81,88514 
322,541 
266,879 
44,65815 
44,65815 
112,489 
52,214 
21,000 
21,000 
34,123 
4,505 
73,243 
73,243 
49,841 
7,674 
350,19316 
350,19316 
2,415,560 
2,415,202 
264,000 
264,000 
191,7261 
191,3741 
485,553 
485,553 
588,687 
587,172 
163,794 
163,794 
155,366 
38,572 
21,772 
21,772 
44,3518 
44,35718 
65,358 
65,000 
1,417 
181,187 
181,842 
3,000 
3,437 
114,700 
2,828

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 4-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
22. Susquehanna River at 
Williamsport, Pa. 
23. Tilghman Island 
Harbor, Md. 
24. Tred Avon River, Md. 
25. Twitch Cove & Big 
Thorofare River, Md. 
26. Washington Harbor, 
D.C. 
27. Wicomico River, Md. 
(Contributed Funds) 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
28. Anacostia River and New Work 
Tributaries, Flood Approp. 
Protection and Cost 
Navigation Maint. 
Improvements, D.C. Approp. 
and Md. Cost 
29. Anacostia River and New Work 
Tributaries, Prince Approp. 
Georges County, Md. Cost 
30. Oxford, Md. New Work 
Approp. 
Cost 
31. Bloomington New Work 
Reservoir North Approp. 
Branch Potomac River, Cost 
Md. and W. Va. 
13,405 
499 
5,500 
1,677 
40,000 
719 
10,000 
- 
- $ 44,161 
- 2,102 
- 18,980 
191 5,860 
1,436 
362 
10,800 
2,833 
542 
-15,000 
3,631 
37,500 
37,500 
12,000 
12,666 
22,700 
2,595 
141,200 
10,124 
45,400 
24,051 
38,000 
134 
7,500 
29,693 
12,427 
12,287 
7,620 
20,105 7,422 
-4,701 
126,875 
1,265,000 1,100,000 574,000 
759,534 1,190,842 624,730 
92,877 
7,818 
10,000 
1,301 
1,000 
221 
515,000 
881,098 
$ 94,682 
52,623 
40,980 
22,842 
55,83019 
5,7831 
22,69320 
13,59720 
11,148 
11,148 
193,175 
193,175 
442,771 
404,905 
3,191,00721 
3,191,00721 
3,608,86722,23 
3,608,44022,23 
471,60924 
471,60924 
545,537 
545,339 
14,000 
14,000 
33,000 
33,000 
6,042,325 
6,042,325 
466,855 
381,796 
22,0002s 
13,30125 
10,50026 
9,721 
4,929,000 
4,856,584 
182 
833 
833

TABLE 4-A (Continued) 
BALTIMORE, MD., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
32. Cumberland, Md., and New Work 
Ridgeley, W. Va. Approp. 
Cost 
Maint. 
Approp. 
Cost 
33. Lackawanna River New Work 
Basin, Pa. Approp. 
Cost 
Maint. 
Approp. 
Cost 
34. Raystown Reservoir New Work 
Raystown Branch Approp. 
Juniata River, Pa. Cost 
35. Southern New York New Work 
Flood Control Approp. 
Projects Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
36. Stillwater Reservoir, New Work 
Lackawanna River, Pa. Approp. 
Cost 
Maint. 
Approp. 
Cost 
37. Susquehanna River New Work 
Flood Control Approp. 
Projects, N.Y. and Cost 
Pa. (Federal Funds) 
(Contributed Funds) New Work 
Contrib. 
Cost 
38. Tyrone, Pa. New Work 
Approp. 
Cost 
39. Unadilla, N.Y. New Work 
Approp. 
Cost 
(Contributed Funds) New Work 
Contrib. 
Cost 
40. West Branch of New Work 
Susquehanna River, Approp. 
Pa. Cost 
Maint. 
Approp. 
Cost 
41. York, Codorus Creek, Ngw Work 
Pa. Approp. 
Cost 
Maint. 
Approp. 
Cost 
9,900 
9,904 
705,000 
634,995 
990,000 
486,222 
65,000 
43,367 
229,400 
226,607 
75,275 
12,900 
13,306 
1,999,000 
1,421,890 
1,500,000 
828,963 
64,000 
105,018 
265,400 
242,262 
2,258 
31,700 31,200 
31,125 31,564 
1,268,000 1,305,000 
767,187 925,333 
11,000 
4,183 
579,000 
560,506 
3,000,000 
4,256,519 
20,000 
62,630 
269,700 
261,985 
36,600 
34,186 
1,633,000 
1,537,030 
73,000 
39,269 
127,000 
10,175 
9,899,410 
9,837,819 
139,300 
121,247 
49,700 
49,142 
525,987 
143,650 
8,715,000 
7,623,200 
80,700 
97,416 
59,400 
57,603 
353,955 
118,133 
2,739,000 
3,520,754 
130,600 
139,124 
81,500 
56,840 
13,037 
16,925 
167,500 
871,068 
18,235 
3,402 
8,490,000 
8,496,594 
-20,000 
972 
384,873 
347,514 
64,943 
60,787 
583,850 
1,227,087 
72,000 
67,718 
896 
13,500 
14,445 
1,579,650 
1,675,831 
204,751 
180,317 
73,347 
85,704 
$15,633,97027,28 
15,633,97027,28 
116,911 
113,594 
4,212,900 
3,971,326 
18,235 
3,402 
15,478,000 
15,343,305 
41,306,91629 
41,304,478 
4,405,35630 
4,311,91130 
527,000 
527,000 
5,725,700 
5,725,700 
325,123 
318,239 
7,452,936 
6,803,144 
39,922 
38,929 
499,516 
461,503 
1,000,000 
999,772 
157,150 
132,578 
56,022,06031 
54,834,72831 
716,633 
690,515 
5,061,16732 
5,061,16732 
1,105,67233 
1,088,90533 
183

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COST AND FINANCIAL STATEMENT 
1. Includes $-237,000 for sections of project in Norfolk 
District. 
2. Includes $-4,340 for sections of project in Norfolk 
District. 
3. Includes $8,764,003 for previous projects. 
4. Includes $304,376 for sections of project in Norfolk 
District. 
5. Includes $1,045 for sections of project in Norfolk 
District. 
6. Includes $269,929 for sections of project in Norfolk 
District. 
7. Includes $936,257 for sections of project in Norfolk 
District. 
8. Includes $537,186 for sections of project in Norfolk 
District. 
9. Includes $399,802 for previous projects. 
10. Includes $43,803 not previously reported for project 
condition surveys for sections of project in Norfolk District. 
11. Includes $61,321 expended on previous projects. 
12. Includes $38,041 expended on previous project. 
13. Excludes $2,200 contributed funds and includes $27,668 
emergency relief funds. 
14. Excludes $5,000 contributed funds. 
15. Includes $5,000 expended on previous project. 
16. Includes $283,008 public works funds and $67,185 
emergency relief funds; excludes $500,000 contributed funds. 
17. Includes $20,500 for previous projects. 
18. Includes $26,500 expended on previous project. 
19. Includes $30 for previous projects. 
20. Includes $6,000 for previous projects. 
21. Includes $3,029,001 for previous projects. 
22. Includes $1,831,609 for previous projects. 
23. Excludes $4,000 for emergency dredging under provisions 
of Section 3, 1945 River and Harbor Act. 
24. Includes $50,000 for previous projects. 
25. Includes $12,000 for Detailed Project Report prior to 
adoption of project. 
26. Includes $9,500 for Detailed Project Report prior to 
adoption of project. 
27. Includes $49,998 from emergency relief funds. 
28. Excludes $1,402,001 contributed funds and $197,513 
public works acceleration funds. 
29. Includes $735,272 emergency relief funds. 
30. Excludes $212,825 contributed funds. 
31. Excludes $263,900 contributed funds. 
32. Includes $11,588 relief funds. 
33. Includes $15,000 for deferred maintenance. 
184 
TABLE 4-A (Continued)

BALTIMORE, MD., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
BALTIMORE HARBOR AND CHANNELS, MD. (See Section 1 of Text) 
Main channel 35 feet deep and 600 feet wide throughout. 
Anchorage basin near intersection of Fort McHenry and Curtis 
Bay Channels (within original limit of cost authorized by 
act of March 2, 1907). 
Width increased at entrances and bends (increase to be made 
within limit of original estimate). 
Branch channel 35 feet deep to head of Curtis Bay, and one 35 
feet deep and 400 feet wide from Fort McHenry to Port 
Covington entrance channel, thence 150 feet wide to Ferry 
Bar, and thence 27 feet deep and 150 feet wide to Hanover 
Street Bridge, widen approaches and bends, and enlarge 
anchorage basin near entrance. Inclusion of Patapsco River 
and tributaries into one project for Baltimore Harbor. 
Change in location of anchorage near upper end of Fort McHenry 
Channel. 
H. Doc. 186, 57th Cong., 2d sess. 
H. Doc 799, 64th Cong., 1st sess. 
Increased anchorage facilities. Rivers and Harbors Committee Doc. 
11, 70th Cong., 1st sess. 1 
For 37-foot depth in that portion of channel to Baltimore H. Doc. 29, 71st Cong., 1st sess. 1 
lying between 37-foot depth curve near Baltimore Light to 
Sparrows Point entrance channel; widen angle between Fort 
McHenry and Ferry Bar Section; and for width of 400 feet in 
Curtis Bay section. 
For 22-, 18-, and 15-foot channels in Curtis Creek from Adopted as a national defense 
22-foot depth below Pennington Ave. Bridge to upper end of project. (No printed report.) 
marginal wharf of U.S. Ordance Depot. 
Uniform main channel 39 feet deep from the ocean through York H. Doc. 741, 79th Cong., 2d sess. 
Spit section and Craighill entrance to Fort McHenry, 
additional anchorage area, 2,400 feet long, 1,200 feet wide, 
and 30 feet deep; a connecting channel 400 feet wide and 27 
feet deep from Cutoff-Brewerton Angle in main channel to 
Inland Waterway from Delaware River to Chesapeake Bay; a 
channel in Curtis Creek 200 feet wide and 35 feet deep from 
head of existing 35-foot project channel in Curtis Bay to 
a point in the creek about 750 feet below Pennington Ave. 
Bridge. 
A channel 22 feet deep and 200 feet wide from 22-foot depth In accordance with plans on file 
curve south of Baltimore & Ohio R. R. bridge about 2,800 in the Office, Chief of 
feet to vicinity of Arundel Cove, thence 100 feet wide in Engineers. 
Arundel Cove for about 2,100 feet; with an anchorage basin 
about 700 feet square adjacent to channel southwesterly of 
Coast Guard wharf. 
Main channel 42 feet deep and 1,000 feet wide in Cape Henry H. Doc. 86, 85th Cong., 1st sess. 1 
section at entrance to Chesapeake Bay and in York Spit 
section; 42 feet deep and 800 feet wide in Rappahannock Spit 
section and in approach channel to Baltimore Harbor from 
Craighill entrance to Fort McHenry, with widening at entrance 
and bends; channels 42 feet deep and 600 feet wide in Curtis 
Bay and Ferry Bar sections of harbor; a connecting channel 
35 feet deep and 600 feet wide from main channel to 
approach channel to Chesapeake and Delaware Canal, and for 
three disjointed sections of channels of same depth and 
width in Chesapeake Bay leading to Chesapeake and Delaware 
Canal; and to provide Federal maintenance of a 39-foot depth 
in Northwest Branch, in areas dredged to that depth by local 
interests. 
BALTIMORE HARBOR, MD.-COLLECTION AND REMOVAL OF DRIFT 
(See Section 2 of Text) 
Collection and removal of drift from Baltimore Harbor and its River and Harbor Act of 1948. 
tributary waters. 
185 
TABLE 4-B 
Mar. 3, 1905 
Mar. 3, 1909 
Feb. 27, 1911 
Aug. 8, 1917 
Jan. 21, 1927 
July 3, 1930 
July 3, 1930 
Oct. 17, 1940 
Mar. 2, 1945 
Mar. 2, 1945 
July 3, 1958 
June 30, 1948

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 4-B (Continued) 
Acts 
May 12, 1966 
Sec. 107 
July 14, 1960 
Mar. 3, 1925 
Aug. 26, 1937 
AUTHORIZING LEGISLATION 
Work Authorized Documents 
BONUM CREEK, VA. (See Section 3 of Text) 
A channel 60 feet wide and 6 feet deep from that depth in the Detailed Project Report, 
Potomac River to and including an anchorage basin of the same August 1965. 
depth, 160 feet wide and 200 feet long. Protection of the 
entrance channel on both sides by jetties. The north jetty 
is about 700 feet long and the south jetty is about 300 feet 
long. 
CAMBRIDGE HARBOR, MD. (See Section 4 of Text) 
Channel 12 feet deep and 150 feet wide to the drawbridge 10 H. Doc. 210, 68th Cong., 1st sess. 
feet deep and 100 feet wide from the bridge to the upper end 
of the harbor with a turning basin. 
Channel 14 feet deep from that depth in Choptank River to the Rivers and Harbors Committee 
head of the harbor with widths of 150 feet below the Market Doc. 7, 75th Cong., 1st. sess. 
St. Bridge in Cambridge and 100 feet above, and a turning 
basin of the same depth at the head of the channel; for an 
anchorage basin 10 feet deep, 400 feet long, and 175 feet 
wide on the west side of the channel and a second basin of 
the same depth 225 feet long and 200 feet wide on the east 
side of the channel; and a channel 60 feet wide and 7 feet 
deep from that depth in Choptank River to the municipal 
boat basin. 
Modification providing for deepening of the channel in H. Doc. 381, 80th Cong., 1st sess. 1 
Choptank River and Cambridge Creek to 16 feet, with a 
turning basin of the same depth and of irregular 
dimensions comprising approximately 2.4 acres. 
CHESTER RIVER, MD. (See Section 5 of Text) 
A channel 7 feet deep at mean low water and 100 feet wide from E. Doc. 25, 42d Cong., 3rd sess. 
Chester River to Eastern Bay through Kent Island Narrows. 
A channel 6 feet deep at mean low water and 60 feet wide from H. Ex. Doc. 65, 51st Cong., 1st 
Crumpton to Jones Landing. sess. 
A channel 7 feet deep at mean low water and 75 feet wide H. Doc. 380, 80th Cong., 1st sess.' 
extending from the 7-foot depth in Kent Island Narrows 800 
feet into Wells Cove with a basin of the same depth and 300 
feet square at the head of the channel. 
CHOPTANK RIVER, MD. (See Section 6 of Text) 
A channel 75 feet in width and 8 feet deep, at mean low water, S. Ex. Doc. 66, 46th Cong., 2d 
from Denton Bridge to Greensboro Bridge. sess. 
A channel through Pealiquor Shoal 8 feet deep and 100 feet H. Doc. 188, 70th Cong., 1st sess. 1 
wide. 
A channel 12 feet deep and 100 feet wide in the Choptank River Detailed Project Report, 
from a point opposite Watts Creek to Denton. November 1967. 
CUCKOLD CREEK, MD. (See Section 7 of Text) 
A channel 60 feet wide and 6 feet deep, from that depth in the Detailed Project Report, 
Potomac River to deep water in Cuckold Creek. August 1966. 
CUNNINGHILL COVE, MD. (See Section 8 of Text) 
Channel 6 feet deep and varying in width from 100 feet to 200 Detailed Project Report, 
feet from that depth in the Gunpowder River to the State's September 1966. 
marina in Cunninghill Cove. 
HARBOR OF BALTIMORE, MD.-PREVENTION OF OBSTRUCTIONS 
(See Section 9 of Text) 
Continuous patrol and inspection of Baltimore Harbor, River and Harbor Act, June 29 
Chesapeake Bay, and its tributaries to prevent and detect 1888 as amended by Public Law 
violations, and issue permits as required for transporting 85-802 dated August 28, 1958. 
and depositing waste materials in navigable waters. (The 
project is limited to the tidal waters of Chesapeake Bay and 
its tributaries that lie within the State of Maryland.) 
June 30, 1948 
Mar. 3, 1873 
Sep. 19, 1890 
June 30, 1948 
June 14, 1880 
July 3, 1930 
Jan. 3, 1969 
Sec. 107 
July 14, 1960 
Jan. 12, 1967 
Sec. 107 
July 14,1960 
May 1, 1967 
Sec. 107 
July 14, 1960 
Aug. 28, 1958 
186

BALTIMORE, MD., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
HERRING BAY & ROCKHOLD CREEK, MD. (See Section 10 of Text) 
July 3, 1930 
June 20, 1938 
Aug. 30, 1935 
June 30, 1948 
Mar. 2, 1945 
Aug. 30, 1935 
A channel 60 feet wide, 5 feet deep, from the 6-foot contour 
in Herring Bay to the 3-foot contour in Rockhold Creek. 
For the present project channel dimensions, 7 feet deep and 
60 feet wide, the turning basin 7 feet deep, and a stone 
breakwater 900 feet long. 
HONGA RIVER & TAR BAY (BARREN ISLAND GAPS), MD. 
(See Section 11 of Text). 
Channel 60 feet wide and 7 feet deep from the 7-foot contour 
in Chesapeake Bay through Tar Bay and Fishing Creek to the 
7-foot contour in Honga River. 
Modification providing for a channel in Back Creek 7 feet deep 
and 60 feet wide from the 7-foot depth curve in Honga River 
to a point near the head of Back Creek, with a turning basin 
of the same depth, 150 feet long and 200 feet wide. 
ISLAND CREEK, ST. GEORGES ISLAND, MD. (See Section 12 of Te: 
A channel 5 feet deep and 50 feet wide through the entrance to 
Island Creek with an anchorage basin of same depth, 200 feet 
wide, and 500 feet long in the creek. 
LITTLE WICOMICO RIVER, VA. (See Section 13 of Text) 
A channel 8 feet deep and 150 feet wide from Potomac River to 
deep water in Little Wicomico River; two stone jetties 1,000 
feet and 1,300 feet long at the entrance; and 1,004 linear 
feet of timber bulkhead to stabilize the dredged inner 
channel. 
Rivers and Harbors Committee Doc. 
34, 71st Cong., 2d sess. 
H. Doc. 595, 75th Cong., 3rd sess.1 
Rivers and Harbors Committee Doc. 
35, 74th Cong., 1st sess. 
H. Doc. 580, 80th Cong., 2d sess.l 
xt) 
H. Doc. 99, 76th Cong., 1st sess.1 
Rivers and Harbors Committee Doc. 
24, 74th Cong., 1st sess.1 
LOWER THOROFARE, DEAL ISLAND, MD. (See Section 14 of Text) 
A channel 6 feet deep, 80 feet wide, from Tangier Sound to the 
wharves at Wenona; widening the angles and the end to furnish 
anchorage basins. 
Modified to provide a channel 60 feet wide, 7 feet deep from 
Tangier Sound to and including a mooring basin 7 feet deep, 
100 feet wide, 300 feet long, in the marsh at the head of the 
cove at Wenona. 
LOWES WHARF, MD. (See Section 15 of Text) 
A channel 60 feet wide and 7 feet deep at mean low water from 
the 7-foot depth curve in Ferry Cove to and including a basin 
of the same depth, 200 feet wide and 300 feet long on the 
south side of Lowes Wharf. 
NANTICOKE RIVER, MD. (See Section 16 of Text) 
A small boat harbor 7 feet deep, 120 feet wide, and 400 feet 
long in the marsh at Nanticoke with an entrance channel of 
the same depth and 60 feet wide protected on either side by 
stone jetties in the river. 
OCEAN CITY HARBOR & INLET & SINEPUXENT BAY, MD. 
(See Section 17 of Text) 
Construction of an inlet between the Atlantic Ocean and 
Sinepuxent Bay, 10 feet deep and 200 feet wide, protected by 
jetties, a channel 8 feet deep and 100 feet wide from the 
inlet to Ocean City, 6 feet deep and 150 feet wide to Green 
Point, and 100 feet wide into Chincoteague Bay. 
Modification providing a 10- by 100-foot channel from the inlet 
to the west side of the bay with 2 turning basins, a channel 
6 feet deep and 125 feet wide from the inlet channel to 
opposite North 8th Street, Ocean City, and 75 feet wide into 
Isle of Wight Bay. 
H. Doc. 76, 60th Cong., 1st sess. 
H. Doc. 238, 76th Cong., 1st sess.1 
H. Doc. 90, 82d Cong., 1st sess. l 
H. Doc. 242, 75th Cong., 1st sess. 1 
Rivers and Harbors Committee Doc. 
38, 72d Cong., 1st sess. 
Rivers and Harbors Committee Doc. 
60, 74th Cong., 1st sess. 
187 
TABLE 4-B (Continued) 
June 25, 1910 
Mar. 2, 1945 
Sep. 3, 1954 
Aug. 26, 1937 
Aug. 30, 19354 
Aug. 30, 19355

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 4-B (Continued) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
Modification providing for raising the north jetty to an 
elevation 9 feet above mean low water, and a channel 300 
feet wide and 16 feet deep from the ocean through the inlet 
to the Isle of Wight Bay channel, thence 200 feet to the 
project harbor, and a depth of 14 feet in the project harbor. 
Channel depths refer to project datum. 3 '6 
POCOMOKE RIVER, MD. (See Section 18 of Text) 
A 9-foot channel from Shad Landing to Snow Hill. 
A channel 7 feet deep and 100 feet wide from Pocomoke Sound to 
Pocomoke River. 
Extend channel above bridge at Snow Hill, 100 feet wide, 9 
feet deep, widened to 150 feet to form a turning basin at 
upper end. 
Channel 11 feet deep by 150 feet wide from Pocomoke Sound to 
Tulls Point, thence 100 feet wide to deep water in Pocomoke 
River above Williams Point, and dike construction along 
south side of channel from existing dike to Tulls Point. 
H. Doc. No. 444, 82d Cong., 2d 
sess. 
Annual Report for 1895, p. 1167. 
H. Doc. 227, 74th Cong., 1st sess. 1 
H. Doc. 429, 76th Cong., 1st sess.' 
H. Doc. 486, 81st Cong., 2d sess. 1 
June 3, 1896 
Aug. 30, 1935 
Mar. 2, 1945 
Sep. 3, 1954 
Oct. 27, 1965 
TILGHMAN ISLAND HARBOR, MD. (See Section 24 of Text) 
A channel 60 feet wide and 6 feet deep from that depth in 
Harris Creek to and including two anchorage basins of the 
same depth, 300 feet by 70 feet and 500 feet by an average 
width of 110 feet. 
TRED AVON RIVER, MD. (See Section 25 of Text) 
Restore the channel formerly dredged from Peach Blossom Creek 
to Easton Point to 8 feet deep at mean low water, and 150 
feet wide, widening out at the upper end. 
Detailed Project Report, 
August 1965. 
H. Doc. 399, 62d Cong., 2d sess.l 
188 
Sep. 3, 1954 
Documents 
POTOMAC & ANACOSTIA RIVERS, D. C.-COLLECTION & REMOVAL OF DRIFT 
(See Section 19 of Text) 
Collection and removal of drift from waters of the Potomac and H. Doc. 286, 89th Cong., 1st sess. 
Anacostia Rivers and their tributaries in the Washington, 
D. C., area from the head of tidewater to Mount Vernon, 
Virginia. 
POTOMAC RIVER & TRIBUTARIES AT AND BELOW WASHINGTON, D. C., 
ELIMINATION OF WATERCHESTNUT (See Section 20 of Text) 
Complete eradication of waterchestnut from the Potomac River H. Doc. 113, 81st Cong., 1st sess. 1 
and its tributaries at and below Washington, D. C. 
RHODES POINT TO TYLERTON, MD. (See Section 21 of Text) 
A channel 4 feet deep at mean low water and 50 feet wide from H. Doc. 51, 82d Cong., 1st sess.' 
Tylerton to Rhodes Point via Rhodes Point Gut. 
Modification providing for a channel 6 feet deep and 50 feet Detailed Project Report, 
wide from that depth in Tyler Creek to and including an February 1968. 
anchorage basin of the same depth 150 feet wide and 400 feet 
long at Tylerton; channel 6 feet deep and 50 feet wide from 
that depth in Shanks Creek to and including an anchorage 
basin of the same depth 100 feet wide and 400 feet long at 
Rhodes Point; channel 6 feet deep and 50 feet wide from that 
depth in Big Thorofare River to Tylerton; channel 6 feet 
deep and 50 feet wide from Rhodes Point to Tylerton. 
ST. JEROMES CREEK, MD. (See Section 22 of Text) 
A channel 7 feet deep and 100 feet wide to Airedele, thence H. Doc. 174, 75th Cong., 1st sess. 1 
7 feet deep and 60 feet wide to deep water in the creek, 
with a turning basin of the same depth, 200 feet wide and 
300 feet long opposite Airedele. 
SUSQUEHANNA RIVER AT WILLIAMSPORT, PA. (See Section 23 of Text) 
A channel, 5 feet deep below extreme low water and varying in Detailed Project Report, 
width from 180 feet to 500 feet, from mile 40.0 to mile 51.4 June 1967. 
of the West Branch Susquehanna River. 
May 17, 1950 
Sep. 3, 1954 
Aug. 1, 1968 
Sec. 107 
July 14, 1960 
Aug. 26, 1937 
Mar. 27, 1968 
Sec. 107 
July 14, 1960 
May 13, 1966 
Sec. 107 
July 14, 1960 
July 25, 1912

TABLE 4-B (Continued) 
BALTIMORE, MD., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 2, 1919 A channel 8 feet deep and 150 feet wide up the North Fork, H. Doc. 27, 63rd Cong., 1st sess. 1 
with a turning basin at the upper end. 
A 12-foot channel from a point near Peach Blossom Creek to 
Easton Point, thence 1,400 feet in North Fork and a turning 
basin 12 feet and 250 feet wide and 600 feet long in the 
South Fork. 
H. Doc. 225, 89th Cong., 1st sess.1 
TWITCH COVE AND BIG THOROFARE, MD. (See Section 26 of Text) 
July 25, 1912 
July 3, 1930 
Aug. 30, 1935 
June 20, 1938 
May 17, 1950 
Aug. 30, 1935 
Sep. 19, 1890 
June 25, 1910 
Mar. 2, 1919 
July 3, 1930 
Aug. 26, 1937 
Sep. 3, 1954 
189 
451-584 0-72-13 
A channel 4 feet deep and 25 feet wide from Tangier Sound into 
Big Thorofare River, and one of same dimensions around point 
between said river and Tyler River. 
A channel 5 feet deep at mean low water and 25 feet wide from 
Twitch Cove on Tangier Sound through Big Thorofare River to 
a point on Levering Creek about 800 feet north of canal at 
Ewell, Md. 
A channel 7 feet deep and 60 feet wide from Twitch Cove 
through Big Thorofare River to a point on Levering Creek 
about 800 feet north of canal at Ewell, Md. 
Present project dimensions of main channel with twin jetties 
at entrance. 
Anchorage basin 7 feet deep, 100 feet wide, and 700 feet long 
on west side of project channel at Ewell, Md., and an 
extension of existing project channel in Levering Creek, 
6 feet deep, 60 feet wide, and 1,000 feet long. 
WASHINGTON HARBOR, D. C. (See Section 27 of Text) 
Provides for: (a) Virginia Channel, from Giesboro Point to 
Francis Scott Key Bridge, 24 feet deep and 400 feet wide, 
with width increased as necessary to afford a low-water 
cross section area of 25,000 square feet; (b) Washington 
Channel, from Hains Point to head of Washington Channel, 
24 feet deep and 400 feet wide; (c) Anacostia River from 
Giesboro Point to Anacostia Bridge, 24 feet deep and 400 
feet wide, with turning basin 800 feet wide and about 2,400 
feet long of same depth opposite Naval Weapons Plant; (d) 
Anacostia River from Anacostia Bridge 24 feet deep and 200 
feet wide to turning basin 400 feet square of same depth at 
foot of 15th Street SE. Channel lengths including turning 
basins are: Virginia Channel, 25,000 feet; Washington 
Channel, 10,000 feet; and Anacostia River, 15,000 feet; and 
(e) operation and maintenance of inlet gates and lock and 
outlet gates of Tidal Basin constructed under a previous 
project to flush Washington Channel. 
WICOMICO RIVER, MD. (See Section 28 of Text) 
Channel 9 feet deep from Main St. Bridge to about 2 miles 
below. 
Extend 9-foot depth into north prong from Main Street Bridge 
to the Salisbury Dam and turning basin. 
Extend 9-foot depth into south prong to head of navigation at 
Cathell St., including a turning basin and extend project 
down to mouth of river in Monie Bay. 
A 12-foot channel below the Main Street Bridge. 
A 14-foot channel, 150 feet wide; depths of 14 feet in the 
north and south prongs and a basin 6 feet deep at Webster 
Cove and approach channel thereto of the same depth. 
Enlarge existing basin at Webster Cove, by dredging an 
extension 6 feet deep, 100 feet wide, and 200 feet long on 
each side of existing basin to form a T-shaped harbor. 
OXFORD, MD. (See Section 32 of Text) 
Stone revetment. Detailed Project Report, 
July 1969. 
Oct. 27, 1965 
H. Doc. 285, 62d Cong., 2d sess. 
H. Doc. 313, 71st Cong., 2d sess. 
Rivers and Harbors Committee Doc. 
67, 74th Cong., 1st sess. 
Rivers and Harbors Committee Doc. 
49, 75th Cong., 2d sess. 1 
H. Doc. 340, 81st Cong., 1st sess. 
Rivers and Harbors Committee Doc. 
22, 74th Cong., 1st sess. l 
H. Doc. 20, 51st Cong. 1st sess., 
and Annual Report, 1890, p. 947. 
H. Doc. 569, 61st Cong., 2d sess. 
H. Doc. 1509, 63rd Cong., 3rd 
sess. 
Senate Committee Print, 75th Cong., 
3rd sess. 
H. Doc. 619, 81st Cong., 2d sess.1 
May 15, 1970 
Sec. 103 
Oct. 23, 1962

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 4-B (Continued) AUTHORIZING LEGISLATION 
Work Authorized 
May 17, 1950 
Mar. 3, 1970 
Sec. 205 
June 30, 1948 
Oct. 23, 1962 
June 22, 1936 
July 24, 1946 
Oct. 23, 1962 
Oct. 23, 1962 
June 22, 1936 
modified by Acts of June 28, 1938; 
Aug. 18, 1941; Dec. 22, 1944; 
May 17, 1950, and July 3, 1958. 
Aug. 18, 1941 
July 3, 1958 
Dec. 22, 1944 
Apr. 1, 1965 
Sec. 205 
June 30, 1948 
Sep. 3, 1954 
June 22, 1936 
ANACOSTIA RIVER & TRIBUTARIES, FLOOD PROTECTION & NAVIGATION 
IMPROVEMENTS, D. C. & MD. (See Section 34 of Text) 
Channel improvements, levees, pumping stations with connecting H. Doc. 202, 81st Cong., 1st sess. 
storm sewers, pressure conduit and relocation and 
reconstruction of 4 highway bridges and 1 railroad bridge. 
ANACOSTIA RIVER AND TRIBUTARIES, PRINCE GEORGES COUNTY, MD. 
(See Section 35 of Text) 
Channel improvements by realigning, widening, and deepening. Detailed Project Report, 
April 1968. 
BLOOMINGTON LAKE, NORTH BRANCH POTOMAC RIVER, MD. & W. VA. 
(See Section 36 of Text) 
Construction of Bloomington Lake project. H. Doc. 469, 87th Cong., 2d sess. 
CUMBERLAND, MD. AND RIDGELEY, W. VA. (See Section 37 of Text) 
Levees, retaining walls, movable dam, and channel clearing for H. Doc. 101, 73rd Cong., 1st sess. 
Cumberland, West Cumberland and South Cumberland, Md., and 
Ridgeley, W. Va. 
Levees, wall, channel improvement, remove Chesapeake and Ohio Report on file in Office, 
Canal dam and construct new industrial dam. Chief of Engineers. 
LACKAWANNA RIVER BASIN, PA. (See Section 38 of Text) 
Construction of Aylesworth Creek Lake, Fall Brook Reservoir, S. Doc. 141, 87th Cong., 2d sess. 
and local protection works on Lackawanna River at Scranton, 
Pennsylvania. 
LAKE RAYSTOWN, RAYSTOWN BRANCH, JUNIATA RIVER, PA. 
(See Section 39 of Text) 
Construction of dam and appurtenant facilities. H. Doc. 565, 87th Cong., 2d sess. 
SOUTHERN NEW YORK FLOOD CONTROL PROJECTS (See Section 40 of Text) 
Construction of detention reservoirs and related flood control H. Doc. 702, 77th Cong., 2d sess. 
works for protection of Binghamton, Hornell, Coming and 
other towns in New York and Pennsylvania. 
STILLWATER RESERVOIR, LACKAWANNA RIVER, PA. 
(See Section 41 of Text) 
Construction of a flood control reservoir. H. Doc. 702, 77th Cong., 2d sess. 
SUSQUEHANNA RIVER FLOOD CONTROL PROJECTS, N. Y. AND PA. 
(See Section 42 of Text) 
Construction of Cowanesque and Tioga-Hammond reservoirs, H. Doc. 394, 84th Cong., 2d sess. 
local flood protection works at Elkland, Pa., and Nichols, 
N. Y., and channel improvement at Cortland, N. Y. 
TYRONE, PA. (See Section 43 of Text) 
Levees, walls, drop structure, channel improvements, and H. Doc. 702, 77th Cong., 2d sess. 
protection of bridges. 
UNADILLA, N. Y. (See Section 44 of Text) 
Channel improvement. Detailed Project Report, 
May 1963. 
WEST BRANCH OF SUSQUEHANNA RIVER, PA. (See Section 45 of Text) 
Construction of three flood control reservoirs. H. Doc. 29, 84th Cong., 1st sess. 
YORK, CODORUS CREEK, PA. (See Section 46 of Text) 
Construction of Indian Rock Dam and channel improvements on H. Doc. 702, 77th Cong., 2d sess. 
Codorus Creek. 
190 
Acts Documents

BALTIMORE, MD., DISTRICT 
AUTHORIZING LEGISLATION 
1. Contains latest published maps. 
2. Exclusive of portion considered inactive. Inactive portion 
is widening 35-foot depth channel from 150 to 400 feet from 
Port Covington to Ferry Bar, widening 27-foot depth channel 
from 150 to 250 feet to Hanover Street Bridge, and providing a 
channel 27 feet deep by 250 feet wide to Western Maryland 
Railway bridge with an anchorage and turning basin at the upper 
end. 
3. Entire modification considered to be inactive. 
4. Included in Public Works Administration program September 
16, 1933. The site chosen for the inlet under this 
authorization was that opened just south of Ocean City by 
natural forces during a severe storm in August 1933. This 
eliminated the necessity for an 8-foot channel from the inlet to 
Ocean City. 
5. Included in Emergency Relief program, 1935. 
6. Raising of the north jetty to an elevation of 9 feet above 
mean low water was accomplished with maintenance funds in 
1956. 
RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 29 of Text) 
Project- 
Annapolis Harbor, Md. 
Back Creek, Anne Arundel Co., Md. 
Broad Creek, Md. 
Crisfield Harbor, Md. 
Fishing Bay, Md. 
Knapps Narrows, Md. 
Manokin River, Md. 
Nanticoke River, Md. (incl. N. W. Fork) 
Parish Creek, Md. 
Rock Hall Harbor, Md. 
St. Catherines Sound, Md. 
St. Peters Creek, Md. 
Tuckahoe River, Md. 
Slaughter Creek, Md. 
Neavitt Harbor, Md. 
Occoquan Creek, Va. 
Potomac River at Alexandria, Va. 
Upper Machodoc Cr., Va. 
191 
TABLE 4-B (Continued) 
TABLE 4-C 
Date 
Survey 
Conducted 
June 1970 
June 1970 
May 1970 
February 1970 
March 1970 
July 1969 
December 1969 
July 1969 
June 1970 
June 1970 
June 1970 
April 1970 
November 1969 
November 1969 
June 1970 
July 1969 
December 1969 
March 1970

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 4-D OTHER AUTHORIZED NAVIGATION PROJECTS 
Cost to June 30, 1971 
For First Full Operation 
Report See Annual and 
Project Report For - Construction Maintenance 
Accotink Creek, Va. 1'2 1878 $ 5,000 $ - 
Anacostia River and Flats3 1953 3,910,582 
Annapolis Harbor, Md. 4 5, s 1946 34,2506 7,206 
Aquia Creek, Va.1 ,4 ,' 1928 52,4657 11,770 
Back Creek, Md. 4 '5 1946 23,061 2,243 
Betterton Harbor, Md.1 1960 3,482 
Black Walnut Harbor, Md. 4 ,s 1966 32,631 56,142 
Branson Cove, Lower Machodoc River, Va.4' 5 1950 15,755 5,792 
Breton Bay, Md.4 , s 5 1950 47,9248 12,621 
Broad Creek River, Del.4'5 1964 64,5209 112,03510 
Broad Creek, Md.4 s 5 1962 28,227 71,576 
Broadwater Creek, Md.l 1949 - 212 
Cadle Creek, Md. 1949 
Channel connecting Plain Dealing Creek and Oak 
Creek, Md.' 1940 112 - 
Claiborne Harbor, Md.2'5 1933 42,974 48,584 
Coan River, Va. 1 '4 1937 - 
Colonial Beach Shore Protection, Va. 1 1950 - 
Corsica River, Md. 4 '5 1948 39,07112 55,908 
Crisfield Harbor, Md.s 1966 349,15413 109,49114 
Cypress Creek, Md. 2 '5 
1947 3,057 1,383 
Duck Point Cove (Hearns Creek), Md.4 '5 1966 25,289 22,033 
Elk and Little Elk Rivers, Md.4 '5 1932 90,12115 44,89216 
Fishing Bay, Md. 4 ,5 1963 33,874 136,551 
Fishing Creek, Md.4 ,5 
1966 111,242 210,747 
Goose Creek, Md.11'2 3 1969 11,119 
Governor's Run, Md.1 1950 - 
Helens Creek, Md.1,14 1950 - 
Herring Creek, Md. 4 , s 5 1961 284,80017 4,596 
Island Creek, Md.2'5 
1948 6,230 3,660 
Knapp's Narrows, Md.4 ',5 1968 46,12118 174,026 
Lake Ogleton, Md.l 1950 
La Trappe River, Md.4 '5 
1948 8,064 18,153 
LittlCer eek, Kent Island, Md. 4 ',5 1958 23,000'9 1,108 
Lower Machodoc Creek, Va.4 '5 1904 9,916 1,634 
Manokin River, Md. 4 ,5, 20 1919 34,78821 32,724 
Middle River and Dark Head Creek, Md.4 , s 5 1947 38,71522 3,421 
Mill Creek, Md.1 1949 - 
Monroe Bay and Creek, Va.4 '5 1965 12,460 54,082 
Muddy Hook and Tyler Coves, Md.5 '23 1966 64,001 1,020 
Nan Cove, Md. 5'2 3 1965 34,86024 
Nanticoke River at Bivalve, Md.5 1963 240,817 22,448 
Nanticoke River (including Northwest Fork), 
Del. and Md.s 
1966 143,13425 61,786 
Neabsco Creek, Va.2 6 1969 7,656 
Neale Sound, Md.4 ,s 1965 12,60027 35,668 
Neavitt Harbor, Md.s 5'23 1968 36,50028 1,187 
Nomini Bay and Creek, Va.4 '5,s 1946 78,446 31,750 
Northeast River, Md.4 ,5 1969 28,48929 94,39530 
Occoquan Creek, Va. 1 ,4 1962 41,2533' 166,609 
192

BALTIMORE, MD., DISTRICT 
TABLE 4-D (Continued) OTHER AUTHORIZED NAVIGATION PROJECTS 
Cost to June 30, 1970 
For Last Full Operation 
Report See Annual and 
Project Report For - Construction Maintenance 
Parish Creek, Md. 4 '5 1963 $ 19,17032 $ 38,217 
Patuxent River, Md.1,4,
3 3 1905 14,00034 
Potomac River at Alexandria, Va. 4'5 1965 95,214 491,500 
Potomac River at Lower Cedar Point, Md. 2'5 1920 10,234 6,216 
Potomac River at Mount Vernon, Va.4 , ' 1950 17,000 53,409 
Potomac River below Washington, D. C. 4 ,5 1967 153,836 1,634,84535 
Potomac River North Side of Washington Channel, 
D. C.3 6 1956 1,744,69237 27,461 
Queenstown Harbor, Md. 4 ,5 1958 72,85838 29,227 
Rock Hall Harbor, Md.5 1964 201,66039 31,74740 
Shad Landing State Park, Md. 5 ' 23 1966 33,53141 560 
St. Catherine Sound, Md. 4 '5 1957 29,94742 5,288 
St. Michaels Harbor, Md. 5', 2 3 1964 16,72343 70 
St. Patricks Creek, Md. 4 '5 1956 15,75227 1,505 
St. Peters Creek, Md.5' 2 3 1963 46,74044 4,126 
Slaughter Creek, Md. 4'5 1948 4,140 2,784 
Smith Creek, Md.4 '5 1936 5,252 279 
Susquehanna River above and below Havre de 
Grace, Md.4 , s 1966 293,5704s 174,045 
Town Creek, Md. 4 ,5 1950 43,220 2,147 
Tuckahoe River, Md. 2 '5 ' 2 0 1923 9,727 1,955 
Tyaskin Creek, Md.4 ,5 ,20 1923 16,29746 18,530 
Upper Machodoc Creek, Va. 4' 5 ,s 1916 20,281 9,615 
Upper Thorofare, Deal Island, Md. 4 '5 1968 62,44647 166,398 
Warwick River, Md. 4 '5 1948 22,04148 76,577 
Waterway from Little Choptank River to Choptank 
River, Md. 1939 305 
1. Entire project inactive. 
2. No commerce reported. 
3. Project being restudied. 
4. Channel adequate for commerce. 
5. Completed. 
6. Includes $8,476 expended on previous project. 
7. Includes $31,065 expended on previous projects. 
8. Includes $37,500 expended on previous projects. 
9. Includes $50,000 expended on previous projects. 
10. Includes $7,463 expended on previous project. 
11. Awaiting local cooperation. 
12. Includes $30,000 expended on previous project. 
13. Includes $87,740 expended on previous project. 
14. Includes $2,839 expended on previous project. 
15. Includes $79,626 expended on previous project. Excludes 
$8,414 contributed funds. 
16. Includes $24,321 expended on previous project. 
17. Excludes $10,306 contributed funds. 
18. Includes $46,121 Public Works funds. 
19. Excludes $1,100 contributed funds. 
20. Abandonment recommended in 1926 (H. Doc. 467, 69th 
Cong., 1st sess.). 
21. Includes $2,000 expended outside project limits. 
22. In addition, $111,581 expended by Navy Department 
and $54,000 expended from contributed funds, all new work. 
23. Authorized by Chief of Engineers. 
24. Excludes $565 contributed funds. 
25. Includes $5,000 expended on previous project. 
26. Portion of the project reclassified to the active category 
in September 1966. 
27. Excludes $1,000 contributed funds. 
28. Includes $862 expended on outstanding liability in FY 
1969. 
29. Includes $20,640 expended on previous project. 
30. Includes $286 expended on outstanding liability in FY 
1970. 
31. In addition, $25,000 expended on previous projects. 
32. Includes $19,170 Works Progress Administration funds. 
33. Abandonment recommended in 1903 (Rivers and Harbors 
Committee Doc. 32, 61st Cong., 2nd sess). 
34. Includes $10,617 expended on previous projects. 
35. Excludes $101,162 Public Health Service funds expended 
for water chestnut removal. 
36. No funds available. 
37. In addition, $389,000 expended from contributed funds. 
38. Includes $19,000 expended on previous project. 
39. Includes $87,757 expended on previous project. 
40. Includes $9,762 expended on previous project. 
41. Excludes $20,806 contributed funds. 
42. In addition, $600 expended from contributed funds. 
43. Excludes $600 contributed funds. 
44. Excludes $6,984 contributed funds. 
45. Includes $22,905 Works Progress Administration funds 
and $97,390 expended on previous project. 
46. Includes $10,158 expended on previous project. 
47. Includes $37,343 Public Works funds and $330 for 
previous projects. 
48. Includes $6,000 expended on previous project. 
193

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 4-E RESERVOIRS AND LOCAL FLOOD PROTECTION 
SSeeieon Project Unit Appropriated to Cost ection Project UnitText June 30, 1970 June 30, 1970 
38. Lackawanna River Basin, Pa. Reservoirs: 
Aylesworth $2,160,000 $1,920,633 
Fall Brook 46,100 46,100 
Local flood protection: 
Scranton 2,006,800 2,004,593 
Total: $4,212,900 $3,971,326 
42. Susquehanna River Flood Control Projects, Reservoirs: 
N. Y. and Pennsylvania Cowanesque $1,699,700 $1,190,069 
Tioga-Hammond 3,819,900 3,684,661 
Local Flood protection: 
Cortland 324,486 324,486 
Nichols 311,000 307,045 
Elkland 1,297,850 1,296,883 
Total: $7,452,936 $6,803,144 
SOUTHERN NEW YORK FLOOD CONTROL PROJECTS 
TABLE 4-F DAMS AND RESERVOIRS' 
(See Section 40 of Text) 
Miles Reservoir Estimated Federal Cost 
Name Nearest City River Above Heht Capacity Lands and 
Mouth (acre-feet) Construction Damages 2 Total 
Davenport Center Oneonta Charlotte Creek 5 100 52,500 $14,780,000 $ 6,120,000 $20,900,000 
West Oneonta Oneonta Otego Creek 2 86 34,500 8,800,000 2,800,000 11,600,000 
East Sidney3 Sidney Ouleout Creek 4 146 33,550 5,279,894 587,244 5,867,1385 
Copes Corner4 Sidney Butternut Creek 3 75 37,900 13,250,000 2,750,000 16,000,000 
Whitney Point3 Binghamton Otselic River 1 95 86,440 3,978,533 1,096,467 5,075,0006 
Arkport3 Hornell Canisteo River 50 113 7,900 1,777,732 132,268 1,910,000 
Almond3 Hornell Canacade Creek 3 90 14,800 4,596,587 954,024 5,550,6117 
Total $52,462,746 $14,440,003 $66,902,749 
1All dams are in New York State; all are earthfill type except 
Ea9, Sidney. 
Includes relocations. 
3 Project completed. 
4 Deferred for restudy. 
6Exclusive of $175,000 for recreational facilities. 
Exclusive of $374,400 for recreational facilities. 7Exclusive of $59,600 for recreational facilities. 
194

BALTIMORE, MD., DISTRICT 
TABLE 4-G 
SOUTHERN NEW YORK FLOOD CONTROL PROJECTS 
LOCAL FLOOD PROTECTION WORKS 
195 
(See Section 40 of Text) 
Miles Estimated Federal Cost 
Location, Lands and 
New ork River Above Type of Structure Construction LandsTotal 
Mouth Damages 
Oxford1 Chenango 40 Levee and channel improvement $ 96,944 $ 34,056 $ 131,000 
Lisle 1 Tioughnioga 12 Wall, levee, and channel realinement 605,000 56,199 661,199 
Whitney Point1 Tioughnioga 10 Levee and channel realinement 411,653 12,443 424,096 
Binghamton' Susquehanna 328 Wall, levee, and conduit 2,844,6822 107,318 2,952,0002 
Elmira1 Chemung 27 Wall, levee, and conduit 6,599,130 139,175 6,738,305 
Corning1 Chemung 44 Wall, levee, flume, and conduit 3,164,0003 158,000 3,322,0003 
Painted Post1 Cohocton - Wall, levee, and channel realinement 402,948 11,233 414,181 
Addison 1 Canisteo 8 Wall, levee, and channel realinement 814,236 12,814 827,050 
Bath1 
Cohocton 21 Wall and levee 638,332 - 638,332 
Avoca1 Cohocton 30 Levee, channel improvement, and 406,589 29,785 436,374 
realinement 
Canisteo 1 Canisteo 36 Levee and wall 1,125,750 57,361 1,183,111 
Hornell1 Canisteo 42 Wall, levee, and channel realinement 3,993,4524 565,246 4,558,6984 
Total $21,102,716 $1,183,630 $22,286,346 
1 Project complete. 
2Excludes contributed funds of $160,095 by city of Binghamton and $3,000 by village of Port Dickinson. 
3Excludes $250,000 of construction by State of New York and $34,729 contributed funds by city of Corning on Monkey Run. 
4 Excludes contributed funds of $15,000 by city of Hornell.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
SOUTHERN NEW YORK FLOOD CONTROL PROJECTS 
COST OF NEW WORK AND MAINTENANCE TO JUNE 30, 1970 
(See Section 40 of Text) 
Unit 
Cost to June 30, 1970 
New Work Maintenance 
Reservoirs: 
Davenport Center2 
West Oneonta 2 
East Sidney 3 
Copes Corner2 
Whitney Point 3 
Arkport3 
Almond 3 
Local flood protection: 
Oxford3 
Lisle3 
Whitney Point Village3 
Binghamton
3 ,4 
Elmira3 
Corning, s 
Painted Post3 
Addison3 
Bath 3 
Avoca 
Canisteo 3 
Hornell 3 6,7 
Almond VillageZ 9 
Total 10 
$ 286,400 
189,100 
5,979,567 
160,700 
5,384,532 
1,910,000 
5,610,211 
131,000 
661,199 
424,096 
2,952,000 
6,738,305 
3,322,000 
414,181 
827,050 
638,332 
436,374 
1,183,111 
4,558,698 
24,662 
$41,831,478 
$ 
675,434 
899,841 
326,216 
601,913 
38,799 
196,085 
79,743 
138,001 
38,143 
175,993 
17,890 
19,885 
132,067 
212,222 
759,679 
$4,311,911 
2Year operationally completed indicated in parentheses. 
3Cost for preliminary work only. 
4Financially complete. 
5Does not include $163,096 contributed funds. 
Includes Monkey Run. Excludes $250,000 of construction by 
State of New York and $34,729 contributed funds by City of Corning. 
Includes Canacadea Creek, Chauncey Run, and Crosby Creek. 
8Does not include $15,000 contributed funds. 
I 8 nstallation of gates on outlets completed in 1955. 
Local cooperation withdrawn, project authorization expired 
May 26, 1953. 
1 Does not include $212,825 contributed funds. 
196 
TABLE 4-H 
Percentage 
of 
Construction 
CompletedI 
100(1950) 
100(1942) 
100(1939) 
100(1949) 
100(1938) 
100(1948) 
100(1948) 
100(1943) 
100(1950) 
100(1955) 
100(1938) 
100(1947) 
100(1948) 
100(1939) 
100(1948) 
100(1941)8 
__

BALTIMORE, MD., DISTRICT 
TABLE 4-I 
WEST BRANCH OF SUSQUEHANNA RIVER, PA. 
ADDITIONAL INFORMATION ON INDIVIDUAL UNITS OF PROJECT 
(See Section 45 of Text) 
Reservoir Curwensville Alvin R. Bush Foster Joseph Sayers 
Nearest large community Curwensville, Pa. Renovo, Pa. Blanchard, Pa. 
Stream distance from mouth of 308 miles 235 miles 207 miles 
Susquehanna River 
Drainage area above dam 365 sq. mi. 226 sq. mi. 339 sq. mi. 
Reservoir: 
Spillway elevation above m.s.l. 1,228 ft. 937 ft. 658 ft. 
Flood control capacity 124,200 acre-ft. 75,000 acre-ft. 99,000 acre-ft. 
Total area of reservoir 3,020 acres 1,430 acres 3,650 acres 
Reservoir length at spillway crest 14 miles 8.8 miles 9.7 miles 
Conservation pool area 540 acres 160 acres 370 acres 
Relocation required Railroad, cemetery, highway, utilities Highway, utilities, cemetery Railroad, highway, cemetery, utilities 
Dam: 
Type Earthfill Earthfill Earthfill 
Top elevation above m.s.l. 1,257.0 ft. 967.7 ft. 683.0 ft. 
Height above streambed 131 ft. 165 ft. 100 ft. 
Design freeboard 4.9 ft. 5 ft. 5.3 ft. 
Top length 2,850 ft. 1,350 ft. 6,835 ft. 
Spillway: 
Location Adjacent saddle Adjacent right abutment Adjacent saddle 
Type Uncontrolled overflow Uncontrolled chute Uncontrolled overflow 
Height above streambed 102 ft. 135 ft. 74.0 ft. 
Width 480 ft. 250 ft. 600 ft. 
Design discharge 164,000 c.f.s. 127,000 c.f.s. 203,000 c.f.s. 
Outlet works: 
Location Left abutment Right abutment Left abutment 
Type Controlled Controlled Controlled 
No. of conduits 1 1 1 
No. of gates 3 3 3 
Gate size 5.5 by 12 ft. 5 by 10 ft. 5.5 by 12 ft. 
Outlet capacity 10,000 c.f.s. 8,120 c.f.s. 9,500 c.f.s. 
Length of stilling basin 82 ft. 104 ft. 
Estimated Federal Cost (June 1970): 
Construction $10,215,242 $5,586,978 $18,120,000 
Lands and damages 10,180,818 1,516,022 12,050,000 
Total $20,396,060 $7,103,000 $30,170,000 
197

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 4-J OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Cost to June 30, 1970 
For First Full Operation 
Report See Annual and 
Project Report For - Construction Maintenance 
Bayard, W. Va.2 1965 $ 55,2183 $ - 
Endicott, Johnson City, and Vestal, N. Y.1 1966 6,121,5344 - 
Forest Heights, Md.2 1964 430,0005 
Genegantslet Reservoir, Genegantslet Creek, 
N. Y. 1954 214,578 
Harpers Ferry, W. Va.6 1937 -- 
Kingston-Edwardsville, Pa.1 1957 4,471,394- 
Kitzmiller, Md.2 1965 501,5008 
Moorefield, W. Va.6 1941 7,928 
Plymouth, Pa.1 1958 1,911,6899 - 
Savage River Dam, Md.1 1954 2,271,93910 33,513 
South Plymouth Reservoir, Canaswacta Creek, 
N. Y. 1953 100,036 
Sunbury, Pa.1 1953 6,063,00011 - 
Swoyersville and Forty Fort, Pa.1 1968 2,728,11312 - 
Upper Marlboro, Md.2 1965 589,993 - 
Washington, D. C. and vicinity 1953 331,92713 - 
Wilkes-Barre, Hanover Township, Pa.1 1958 3,853,45714 
Williamsport, Pa.1 1957 12,819,89315 
1. Completed. 
2. Authorized by Chief of Engineers under small flood 
control project authority provided by Section 205, 1948 Flood 
Control Act, as amended. 
3. Excludes $182,672 Public Works Acceleration funds and 
$4,290 contributed funds. 
4. Excludes $154,694 contributed funds. 
5. Excludes $87,720 contributed funds. 
6. Inactive. Recommended for abandonment in survey 
report on Potomac River dated April 30, 1944. (H. Doc. 622, 
79th Cong., 2nd sess.) 
7. Includes $1,162,548 emergency relief funds and excludes 
$225,877 emergency relief funds expended prior to adoption of 
project. 
8. Excludes $6,616 contributed funds. 
9. Includes $4,357 emergency relief funds. 
10. Includes $200,000 expended from contributed funds. 
11. Excludes $140,504 contributed funds. 
12. Includes $4,281 expended for outstanding liability in FY 
1969. 
13. Cost of previous project. Includes $106,500 emergency 
relief funds. 
14. Includes $872,715 emergency relief funds. Excludes 
$36,375 emergency relief funds expended for new work before 
adoption of project. 
15. Includes $1,887 emergency relief funds and excludes 
$110,835 contributed funds. 
198

TABLE 4-K 
Location 
Prince Georges County, Maryland - 
Henson Creek 
Montgomery County, Maryland - 
Seneca Creek 
Prince Georges County, Maryland - 
Beaverdam Creek 
Prince Georges County, Maryland - 
Piscataway Creek 
Prince Georges County, Maryland - 
Southwest Branch (Western 
Branch, Patuxent River) 
City of Alexandria and Arlington 
County, Virginia - Four Mile Run 
Clarke County, Virginia 
Shenandoah River 
Broome County, New York - 
Susquehanna and Chenango Rivers 
Broome County, New York - 
Susquehanna River (East End) 
Lycoming County, Pennsylvania - 
Loyalsock Creek 
Lycoming County, Pennsylvania - 
Lycoming Creek 
COLLECTION AND STUDY OF BASIC DATA 
(See Section 52 of Text) 
Requesting Agency 
Maryland National Capital Park and 
Planning Commission 
Maryland National Capital Park and 
Planning Commission 
Maryland National Capital Park and 
Planning Commission 
Maryland National Capital Park and 
Planning Commission 
Maryland National Capital Park and 
Planning Commission 
City of Alexandria and Arlington County 
Board of Supervisors of Clarke County 
Broome County Planning Commission 
Broome County Planning Commission 
Central Lycoming Planning Commission, 
Lycoming County 
Central Lycoming Planning Commission, 
Lycoming County 
Date Completed 
July 1966 
September 1967 
November 1967 
January 1968 
September 1968 
October 1968 
February 1969 
December 1969 
June 1970 
June 1970 
June 1970 
Federal Cost 
$20,000 
22,000 
16,500 
20,500 
23,000 
16,000 
30,500 
46,000 
56,000 
26,200 
30,950 
rcj 
y
O
t
tl 
tl 
d 
dd 
y
7d 
yj 
TABLE 4-K

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 4-L 
MAINTENANCE, OPERATION, AND CAPITAL OUTLAY OF WASHINGTON AQUEDUCT 
COST AND FINANCIAL SUMMARY AS OF JUNE 30, 1970 
(See Section 53 of Text) 
Water Supply Costs: 
Total accrued expenditure costed for fiscal year was $5,168,378, distributed as follows: 
Operating Expenses 
Deferred 
Total Operating Expenses 
Total Capital Outlay 
Total Cost for Fiscal Year 1970 
Operating expenses, cost per million gallons 
Financial Summary: 
Net Appropriations 
Less Unexpended Balance 
Total Costs 
$4,009,929 
92,813 
$4,102,742 
1,065,636 
$5,168,378 
$56.80 
$138,405,540 
2,541,185 
$135,864,355 
Division of Costs 
Paid by 
Dist. of Col. Dist. of Col. 
Units United States General Fund Water Fund Tot 
Construction $10,937,037 $ 9,109,313 $43,986,390 $64,032,740 
Maintenance 1,250,657 955,473 69,287,436 71,493,566 
Spring-water supply 223,622 - 223,622 
Deferred charges: 
Operations - - 114,428 114,428 
Total $12,411,316 $10,064,7861 $113,388,254 $135,864,3562 
lIncludes such part of the annual lump-sum contribution by the United States to the District of Columbia that could be considered a direct federal 
expenditure. 
2Includes: Value of property transferred without reimbursement to or from other government agencies: 
to "Other Government Agencies" $ 3,973,293 
from "Other Government Agencies" -4,011,758 
to "District of Columbia" 3,202,992 
$ 3,164,527 
Also includes $1,076,658 Value of Property "Retired or Abandoned."
200

NORFOLK, VA., DISTRICT* 
This District comprises the State of Virginia, except 
the Potomac, Roanoke and Ohio River Basins; the 
entire area on the eastern shore of Virginia except for 
the project for Pocomoke River, Maryland and 
Virginia. On the west shore of Chesapeake Bay, all 
waterways south of Smith Point, Virginia, at the mouth 
of the Potomac River except the project for Little 
Wicomico River, Virginia. North Carolina, only the 
Chowan River Basin downstream to and including the 
mouth of the Meherrin River, and the Dismal Swamp 
Canal Route of the Atlantic Intracoastal Waterway to 
the Albemarle Sound. West Virginia, only the James 
River Basin. 
IMPROVEMENTS 
Navigation 
1. Atlantic Intracoastal Waterway Between 
Norfolk, Va. and St. Johns River, Fla. 
(Norfolk District) ................... ......... 
2. Aquatic Plant Control ............................ 
3. Baltimore Harbor and Channels 
(Norfolk District.) ................................ 
3A. Cape Henry Channel, Va ...................... 
3B. Rappahannock Shoal Channel, Va ....... 
3C. York Spit Channel, Va. ....................... 
4. Hampton Roads and Harbors of 
Norfolk and Newport News, Va.- 
Collection and Removal of Drift ........ 
5. Hampton Roads, Va ............................... 
5A. Channel to Newport News, Va.............. 
5B. Norfolk Harbor, Va ................................ 
5C. Thimble Shoal Channel, Va ...... ........ 
6. Jackson Creek, Va ................................... 
7. James River, Va ...................................... 
8. Lynnhaven Inlet, Va ............................... 
9. Rappahannock River, Va. ....................... 
10. Starlings Creek, Va ................................. 
11. Supervision of Harbor of Hampton 
Roads, Va. (Prevention of Obstructive 
and Injurious Deposits) ................. 
12. Tangier Channel, Va. .............................. 
13. Totuskey Creek, Va ................................ 
Page 
14. 
15. 
201 16. 
202 17. 
18. 
203 19. 
203 
203 
203 20. 
21. 
203 
204 
204 22. 
2044 23. 
206 24 
206 25 
207 
208 
208 
209 26. 
209 27. 
209 28. 
210 29. 
Navigation (cont.) Page 
Tylers Beach, Va. ...................................... 210 
Waterway on the Coast of Virginia ....... 210 
Wishart Point Channel, Va. .................... 211 
Reconnaissance and Condition Surveys . 211 
Other Authorized Navigation Projects ... 211 
Navigation Work Under Special 
Authorization ..................................... 211 
Beach Erosion Control 
Virginia Beach, Va ............................. 211 
Beach Erosion Control Work Under 
Special Authorization ...................... 212 
Flood Control 
Gathright Lake, James River Basin, Va. 212 
Newmarket Creek, Va. (Local Flood 
Protection) ..................................... 213 
Norfolk, Va. (Local Flood Protection) ... 213 
Flood Control Projects Under Special 
Authorization .................................... ... 213 
Multiple- Purpose Projects Including Power 
Salem Church Lake, Rappahannock 
River Basin, Va. .................................... 214 
General Investigations 
Surveys ................. ................................. 214 
Collection and Study of Basic Data ....... 214 
Research and Development ..................... 214 
NAVIGATION 
1. ATLANTIC INTRACOASTAL 
WATERWAY BETWEEN NORFOLK, 
VA., AND ST. JOHNS RIVER, FLA. 
(NORFOLK DIST.) 
Location. Two inland water routes approximately 
paralleling Atlantic coast south of Norfolk, Va., 
between a point in Southern Branch of Elizabeth 
River, Va., 2,500 feet upstream of Norfolk & Western 
Railway bridge and Virginia- North Carolina State 
line in North Landing River, a distance of 27.2 miles; 
and 64.6 miles between mouth of Deep Creek, Va., and 
mouth of Pasquotank River, N.C. These routes are 
shown on Coast and Geodetic Survey Charts 452,1227, 
829, and 830. 
Previous projects. For details see Annual Report for 
1938. 
Existing project. A channel 12 feet deep at mean low 
water and 90 to 250 feet wide following Southern 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
201

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Branch of Elizabeth River, 5.2 miles, Virginia Land 
Cut, 8.3 miles, and North Landing River, 13.7 miles; 
and construction of a tidal guard lock at Great Bridge, 
Va. It also provides channels 10 feet deep at mean low 
water and 80 to 100 feet wide in Deep Creek, 3.1 miles, 
Turners Cut, 4.3 miles, and Pasquotank River, 35.1 
miles; maintaining Dismal Swamp Canal, 22.1 miles, 
to about 9 feet deep mean canal level over a width of 50 
feet; protection of banks in Turners Cut with sheet 
piling, and cutting certain sharp points in Pasquotank 
River to shorten its course. (See Table 5-C at end of 
chapter on Data Relative to Completed Locks 
Included in Project.) 
Project includes operating and care of completed 
locks, dams, and bridges, under maintenance. 
Southern Branch of Elizabeth River and Deep Creek 
sections of the two routes are tidal, mean range being 
about 3 feet with extremes of minus 3.5 and plus 9.6 
feet. Remaining sections are nontidal with fluctuations 
of 1 to 2 feet in level due to winds. Cost for new work for 
completed project was $3,396,276. Protection to canal 
property at Great Bridge portion is considered inactive 
and excluded from foregoing cost. Estimated cost of this 
portion (1954) is $265,000. (See Table 5-B for 
authorizing legislation.) 
Local cooperation. None required 
Terminal facilities. Terminal facilities serving the two 
water routes at northern terminus are described in 
report for Norfolk Harbor, Va. South of Norfolk there 
are 3 piers, 15 wharves, 6 landings, 5 marine railways, 
and 3 bulkheads serving these routes. Landings are 
publicly owned and open to the public without charge. 
Remaining facilities are privately owned and open to 
the public at a nominal charge. These facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. Operation and 
ordinary maintenance of the project, consisting of real 
estate management services, condition and operation 
studies, operation and care of the locks, bridges, 
spillways, wharves, canal plant, grounds, roads, 
buildings, etc., with Government plant and hired 
labor, were carried on during the year at a cost of $729, 
519. 
Maintenance dredging, by contract, in Virginia Cut 
and Southern Branch of the Elizabeth River, in 
progress at the beginning of the fiscal year, was 
completed on October 10, 1969. There were removed 
422,932 cubic yards of material, place measurement, at 
a direct cost of $221,948. 
Maintenance dredging, by contract, of the Dismal 
Swamp Canal at Deep Creek and in the vicinity of the 
feeder ditch was commenced June 6, 1970 and was in 
progress at the end of the year. There were removed 
19,000 cubic yards of material, place measurement, at a 
direct cost of $25,912. 
A contract for repair and overhaul of the 
Government Bridge at Great Bridge, Va. was awarded 
during the year. The work was about 70% complete at 
the end of the year at a direct cost of $240,122. 
Permanent operating equipment, to be used on both 
routes, was purchased at a direct cost of $58,650. 
Maintenance snagging and bank trimming operations, 
with Government plant and hired labor, were carried 
on at several locations on both routes intermittently at 
a direct cost of $20,331. 
Maintenance repairs to bulkheads on both routes, 
with Government plant and hired labor, were 
accomplished at a direct cost of $10,597. Maintenance 
engineering and design, supervision and 
administration and real estate activity costs, less credits 
for collections for quarters and damages to 
Government property, amounted to $36,506. 
Condition at end of fiscal year. Project is complete. For 
construction details, see Annual Report for 1966. Total 
cost of existing project to June 30, 1970, was $23,076, 
496 of which $3,396,276 (including $1 million for 
purchase of Albemarle & Chesapeake Canal and 
Dismal Swamp Canal) was for new work, $19,200,273 
for maintenance, and $479,947 for rehabilitation. 
Periodic maintenance dredging is being done to 
maintain a 12- foot controlling depth on the Albemarle 
and Chesapeake Canal Route and a 7- foot controlling 
depth on the Dismal Swamp Canal Route. 
2. AQUATIC PLANT CONTROL, VA. 
Location. Navigable waters, tributary streams, 
connecting channels, and other allied waters in Norfolk 
District. Areas in which there are significant aquatic 
plant nuisance problems include Back Bay-Eurasian 
water milfoil; Rappahannock River-Eurasian water 
milfoil; City of Norfolk-sea lettuce; and Chickahominy 
River-elodea. 
Existing project. Provides for control and progressive 
eradication of water- hyacinth, alligatorweed, 
Eurasian water milfoil, and other obnoxious aquatic 
plant growths, from the navigable waters, tributary 
streams, connecting channels, and other allied waters 
of the United States, in the combined interest of 
navigation, flood control, drainage, agriculture, fish 
and wildlife conservation, public health, and related 
purposes, including continued research for 
development of the most effective and economic 
control measures, to be administered by the Chief of 
Engineers, under the direction of the Secretary of the 
Army in cooperation with other Federal and State 
agencies. 
Local cooperation. Local interests must agree to hold 
the United States free from damages that may occur 
from operations performed in connection with this 
project, and participate to extent of 30 percent of cost of 
program. 
Operations and results during fiscal year. Review 
comments of various, interested agencies, regarding the 
General Design Memorandum for Virginia were 
received. As a result of coordination meetings and 
correspondence, interest was indicated such that a oneseason, 
experimental control program is anticipated on 
the Walker Dam Impoundment, Chickahominy River, 
Virginia. However, local interests and other agencies 
did not indicate an interest in operational control 
programs for the three remaining areas where aquatic 
202

NORFOLK, VA., DISTRICT 
plant problems exist. This reluctance was due 
primarily to the lack of an acceptable method of 
control. It was agreed that continued surveillance of 
the aquatic plant infestations in these areas as well as 
appropriate coordination would be maintained. 
Condition at end of fiscal year. The General Design 
Memorandum was approved and a one- season, 
experimental treatment was authorized for the Walker 
Dam Impoundment, Chickahominy River, Virginia. 
The Virginia Commission of Game and Inland 
Fisheries tentatively agreed to furnish the items of local 
cooperation required for the one- season experimental 
treatment. Pending receipt of the formal assurances of 
local cooperation, spraying operations are scheduled in 
late fiscal year 1971. 
3. BALTIMORE HARBOR AND 
CHANNELS (NORFOLK DIST.) 
Existing project for entire project provides for deep 
water approach channels in Chesapeake Bay and 
branch channels in Baltimore Harbor. Northern 
portion including Baltimore Harbor is under 
jurisdiction of Baltimore District. Portion under 
jurisdiction of Norfolk District is more fully described 
below. 
3A. CAPE HENRY CHANNEL, VA. 
Location. At mouth of Chesapeake Bay opposite Cape 
Henry. (See Coast and Geodetic Survey Chart 1222.) 
Existing project. A channel about 1.1 miles long, 1,000 
feet wide, and 42 feet deep at mean low water through 
shoal at mouth of Chesapeake Bay opposite Cape 
Henry. Under ordinary conditions mean range of tide 
is 2.5 feet and extreme 3 feet. Extremes of irregular 
fluctuation due to combined effect of wind and tides, 
referred to mean low water, are minus 2 feet and plus 
9.5 feet. (See Table 5-B for authorizing legislation.) 
3B. RAPPAHANNOCK SHOAL CHANNEL, 
VA. 
Location. In lower Chesapeake Bay opposite mouth of 
Rappahannock River and about 50 miles northerly 
from Atlantic Ocean at entrance of Chesapeake Bay. 
(See Coast and Geodetic Survey Chart 1222.). 
Existing project. A channel about 5.3 miles long, 800 
feet wide, and 42 feet deep at mean low water between 
contours of that depth in Chesapeake Bay, opposite 
Rappahannock River. Under ordinary conditions 
mean tidal range is 2.5 feet and extreme 3 feet. 
Extremes of irregular fluctuation, due to combined 
effect of wind and tides, referred to mean low water, are 
minus 2 feet and plus 9.5 feet. (See Table 5-B for 
authorizing legislation.) 
3C. YORK SPIT CHANNEL, VA. 
Location. In lower Chesapeake Bay opposite mouth of 
York River and about 20 miles northerly from Atlantic 
Ocean at entrance of Chesapeake Bay. (See Coast and 
Geodetic Survey Chart 1222.) 
Previous project. For details see Annual Report for 
1932. 
Existing project. A channel about 10.8 miles long, 1, 
000 feet wide, and 42 feet deep at mean low water 
between contours of that depth in Chesapeake Bay 
opposite York Spit. Under ordinary conditions mean 
tidal range is 2.5 feet and extreme 3 feet. Extremes of 
irregular fluctuation, due to combined effect of wind 
and tides, referred to mean low water, are minus 2 feet 
and plus 9.5 feet. (See Table 5-B for authorizing 
legislation.) 
Local cooperation. None required. 
Terminal facilities. None. These three channels form 
the access between lower and upper Chesapeake Bay. 
Operations and results during fiscalyear. Operation of the 
project including condition surveys and inspections 
and reports amounted to a cost of $4,193. Maintenance 
dredging with the U. S. Hopper Dredge Goethals in 
Cape Henry Channel commenced October 30,1969 
and was completed December 31, 1969. There were 
removed 538,750 cubic yards of material, place 
measurement at a direct cost of $469,675. Maintenance 
engineering and design and supervision and 
administration costs amounted to $63,318. 
Condition at end of fiscal year. Project is complete. For 
construction details see Annual Report for 1967. 
Controlling depths, mean low water; In York Spit 
Channel (June 1970), 42 feet in midchannel and 40.9 
feet along edges; in Rappahannock Shoal Channel 
(January 1968), 42 feet; and in Cape Henry Channel 
(January 1970), 42 feet. 
4. HAMPTON ROADS AND HARBORS OF 
NORFOLK AND NEWPORT NEWS, VA.- 
COLLECTION AND REMOVAL OF 
DRIFT 
Location. Hampton Roads is a natural harbor 300 
miles south of New York and 180 miles south of 
Washington, D.C. Its principal tributaries are James 
River, affording a natural deep harbor at Newport 
News, Va.; Elizabeth River, with its Southern, Eastern, 
and Western Branches, providing harbors for Norfolk 
and Portsmouth, Va.; and Hampton Creek serving the 
harbor at Hampton, Va. (See Coast and Geodetic 
Survey Charts 400 and 452.) 
Existing project. Collection and removal of drift in 
Hampton Roads and its tributary waters, authorizes 
the Secretary of the Army to allot necessary amounts 
for work from appropriations for maintenance and 
improvement of existing river and harbor works or 
from other available appropriations, and that this work 
shall be carried on as a separate and distinct project. It 
is wholly a work of maintenance. Purpose of work is to 
afford relief from variable conditions of obstruction, 
and no advance estimate of amount of work required 
and its proper cost can be made. Existing project 
authorized by 1950 River and Harbor Act. 
Local cooperation. None required. 
Terminal facilities. See Norfolk Harbor and Channel 
to Newport News, Va. 
203

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. Maintenance 
operations, with Government plant and hired labor, 
consisted of collection and disposal of an estimated 67, 
500 cubic feet of a variety of floating refuge, ranging 
from discarded furniture to heavy timbers and piling. 
Condition at end of fiscal year. Existing project is one of 
continunous maintenance for which no percentage of' 
completion exists. Operations under existing project 
began in July 1950. Costs for removal of drift before 
then were carried under "Norfolk Harbor, Va." 
5. HAMPTON ROADS, VA. 
The three projects, Norfolk Harbor, Va., Thimble 
Shoal Channel, Va., and channel to Newport News, 
Va., are grouped under the above heading for 
construction purposes only. Estimated Federal cost 
(1970) for new work for all three projects is $58,062, 
200, exclusive of amounts expended-.for previous 
projects. Details of each project are given below. 
5A. CHANNEL TO NEWPORT NEWS 
Location. West of north entrance to Norfolk Harbor 
Channel, connects deep water in James River with 
Hampton Roads. (See Coast and Geodetic Survey 
Chart 400.) 
Previous projects. For details see Annual Report for 
1938. 
Existing project. Dredging a channel 45 feet deep at 
mean low water and 800 feet wide from that depth in 
Norfolk Harbor Channel about 4.5 miles to Newport 
News, and two deepdraft anchorage berths opposite 
Newport News 45 feet deep over a 1,200- foot swinging 
radius. Under ordinary conditions mean tidal range is 
2.7 feet and extremes 2.1 and 3 feet. Extremes of 
irregular fluctuations due to combined wind and tides, 
referred to mean low water, are minus 2 feet and plus 
9.5 feet. (See Table 5-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. Latest published description of 
terminal facilities is in "Port Series No. 11 (revised 
1959) Part 2" on Ports of Hampton Roads, Va., 
prepared by Board of Engineers for Rivers and 
Harbors. Since 1959 piers 3,4 and 5 have been replaced 
by a new cargo pier, container handling facilities have 
been added and the capability of the port for handling 
general cargo and coal has increased. 
Operations and results during fiscal year. New work 
dredging, by contract, to deepen the inbound half of 
the channel to a depth of 45 feet, in progress at the start 
of the year was completed on December 30, 1969. 
There were removed 1,227,987 cubic yards of material, 
place measure at a direct cost of $1,139,059. 
A contract for removal of the sunken wreck in the 
channel was advertized, but no bids were received. An 
agreement was subsequently reached with the U. S. 
Navy for removal of the wreck with Navy plant and 
personnel as a training exercise. By the end of the year 
the Navy had conducted extensive investigations of the 
wreck and developed a plan for its removal. 
New work engineering and design and supervision 
and administration costs amounted to $26,013. 
Maintenance dredging, with U. S. Hopper Dredge 
Goethals in the outbound half of the channel, was 
commenced May 10 and completed May 16, 1970. 
There were removed 114,350 cubic yards of material, 
place measure, at a direct cost of $66,063. 
Maintenance engineering and design and 
supervision and administration amounted to a cost of 
$26,013. 
Condition at end of fiscal year. Existing project is about 
55 percent complete. Construction of the 40- foot 
project was commenced in March 1929 and completed 
in June 1931. Deepening and widening the channel to 
45 feet deep and 800 feet wide commenced March 1967 
and was completed in December 1969. Controlling 
depths (March-June 1970) were 45 feet and 39.5 feet 
over the wreck. Work remaining to complete project 
consists of removal of the wreck blocking a portion of 
the channel and dredging of two deepdraft anchorages 
opposite Newport News. Cost of existing project to 
June 30, 1970, was $8,086,676 of which $7,424,800 was 
for new work and $661,876 for maintenance. 
5B. NORFOLK HARBOR, VA. 
Location. Norfolk, Va., is 187 miles south of 
Baltimore, Md., and 30 miles from entrance to 
Chesapeake Bay at Cape Charles and Cape Henry. 
Harbor extends 18.3 miles from 45- foot contour in 
Hampton Roads to a point 2,500 feet above Norfolk & 
Western Railway bridge over Southern Branch of 
Elizabeth River. (See Coast and Geodetic Survey 
Charts 400 and 452.) 
Previous projects. For details see Annual Report for 
1938. 
Existing project. A main channel 45 feet deep, 1,500 
feet wide from that depth in Hampton Roads near Fort 
Wool to a point just south of Norfolk International 
Terminal piers; thence at same depth 800 feet wide to 
Lambert Point; thence 40 feet deep and 750 feet wide 
to mouth of Southern Branch of Elizabeth River, and 
450 feet wide up this branch to Belt Line Railroad 
bridge, including an approach and turning area to 
same depth and a maximum width of 830 feet opposite 
Norfolk Naval Shipyard, extending downstream 3,250 
feet from Belt Line Railroad bridge; thence, 40 feet 
deep, 375 feet wide and 1 mile long to Norfolk & 
Western (formerly Virginian) Railway bridge; thence, 
35 feet deep, 250 feet wide, and 3.1 miles long to a point 
1,900 feet above Norfolk & Western Railway 
(Gilmerton) bridge, with adequate widening of 
channel at bends, a turning basin 35 feet deep and 600 
by 600 feet at upstream end, a turning basin 35 feet 
deep, 400 to 600 feet wide, and 800 feet long at mouth 
of St. Julians Creek, a total of 18.3 miles; a channel in 
Eastern Branch, 25 feet deep, 500 feet wide, and 1.09 
miles long from 40- foot channel at mouth to Norfolk & 
204

NORFOLK, VA., DISTRICT 
Western Railway bridge; thence, 25 feet deep, 300 feet 
wide, and 0.55 mile long, to Campostella Bridge; 
thence, 25 feet deep, 200 feet wide, and 1.2 miles long 
to Norfolk & Western (formerly Virginian) Railway 
bridge; and for maintenance at a depth of 25 feet of 
existing turning basin about 5.5 acres in extent at head 
of existing project just below Norfolk & Western 
(formerly Virginian) Railway bridge; a channel in 
Western Branch, from 40- foot channel in Elizabeth 
River 24 feet deep, 300 feet wide, and 0.78 mile long, 
thence 24 feet deep and 200 feet wide, for 0.37 mile to 
West Norfolk Highway bridge; thence 18 feet deep, 
150 feet wide, 0.57 mile long; a channel in Scotts Creek 
between 40- foot channel at mouth and a point 100 feet 
above former location of Atlantic Coast Line Railroad 
bridge (about 0.73 mile upstream), 12 feet deep and 
100 feet wide; anchorage areas on west side of 40- foot 
channel opposite Lambert Point and south of Craney 
Island aggregating 173 acres, consisting of; One 
anchorage space 1,500 feet square and 38 feet deep; 
one anchorage space 1,500 feet square and 35 feet 
deep; one anchorage 1,000 feet wide, 3,000 feet long, 
and 20 feet deep; another anchorage of 45 acres, 12 feet 
deep, near Pinner Point; two anchorages opposite 
Sewells Point 45 feet deep over swinging radius of 1.200 
feet; and a trapezoidal- shaped disposal area of about 
2,500 acres of flats adjacent to and north of Cranev 
Island, inclosed by stone- faced levees, three sluiceways, 
in west levee, an access road, facilities for sump 
rehandling of hopper dredged material consisting of 
mooring dolphins, an anchorage for sump rehandler, 
100 by 600 feet, 21 feet deep, with approach channel 
300 by 3,600 feet, 30 feet deep connecting anchorage 
with Norfolk Harbor 45- foot channel, and a discharge 
line for sump rehandler consisting of shore pipe, a 
submerged pipeline with pontoon and floating landing, 
and facilities for contract rehandling of bucketdredged 
materials consisting of a rehandling basin 1, 
000 by 1,000 feet, 46 feet deep, protected by a spur 
levee extending 2,350 feet from main levee and 
provided with approach- exit channels 200 feet wide by 
18 feet deep to Norfolk Harbor 45- foot channel and a 
pipeline trestle from rehandling basin to leveed area. 
All depths are referred to mean low water. Mean tidal 
range is 2.7 feet and extreme is 3.4 feet. Extremes of 
irregular fluctuations, due to combined effect of tides 
and wind, referred to mean low water, are minus 3.5 
feet and plus 9.62. Eastern Branch, 30- foot channel 
portion is considered inactive. Estimated cost (1954) of 
this portion is $43,000. (See Table 5-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. Total 
estimated cost for all requirements of local cooperation 
under terms of project authorization, including 
required non- Federal contributions, was $1,150,000 
(1967). 
Terminal facilities. Latest published description of 
terminal facilities is in "Port Series No. 11 (revised 
1959) Part 2" on Ports of Hampton Roads, Va., 
prepared by Board of Engineers for Rivers and 
Harbors. Since 1959 numerous additions have been 
made to facilities for handling coal and general cargo. 
Notable additions include construction of a coal pier at 
Norfolk and container handling facilities at Norfolk 
and Portsmouth, Va. 
Operations and results during fiscal year. A contract was 
advertised at the close of the fiscal year for new work 
dredging the two deep- draft anchorages opposite 
Sewells Point. Bids on the contract will be received in 
fiscal year 1971. New work engineering and design and 
supervision and administration costs amounted to $17, 
825. 
Operation of the project, including condition and 
operation studies, office studies and reports, care of 
buildings, grounds, utilities, roads, levees, plant and 
hopper dredge pipeline amounted to a cost of $388,218. 
Maintenance dredging, by contract, in the Southern 
Branch 35- foot channel, commenced September 10 
and was completed December 9, 1969. There were 
removed 483,850 cubic yards of material, place 
measure, at a direct cost of $371,019. 
Maintenance dredging, by contract, of the approach 
channels to the Craney Island rehandling basin and 
debris unloading facility commenced March 7 and was 
completed on May 11, 1970. There were removed 45, 
457 cubic yards of material, place measure, at a direct 
cost of $22,733. 
Maintenance dredging, by contract, in the 45- foot 
channel in the vicinity of the U. S. Navy Degaussing 
Range, commenced May 24, 1970 and was in progress 
at the end of the year. There were removed 121,000 
cubic yards of material, place measure, at a direct cost 
of $126,003. 
Maintenance dredging, with U. S. Hopper Dredges 
Goethals and Comber in the 40- and 45-foot channels, 
commenced January 1 and was completed May 10, 
1970. There were removed 1,343,830 cubic yards of 
material, place measure, at a direct cost of $930,908. 
Maintenance repairs, with Government plant and 
hired labor, to dredging range structures were made at 
a direct cost of $6,337. A contract for replacement of 6 
dredging ranges was awarded at the end of the fiscal 
year. 
Maintenance repairs, by both contract and hired 
labor, to the hopper dredge unloading facility, were 
accomplished at a direct cost of $29,511. Maintenance 
levee and sluiceway work by both contract and hired 
labor was accomplished at a direct cost of $10,288. 
Equipment for use at Craney Island Disposal Area was 
purchased at a direct cost of $22,893. 
Maintenance engineering and design and 
supervision and administration costs less miscellaneous 
income from grants amounted to a net cost of $192,003. 
In addition, maintenance dredging, by contract, of 
the rehandling basin at Craney Island Disposal Area 
commenced March 7 and was completed May 11, 
1970. There were removed 662,909 cubic yards of 
material, place measure at a direct cost of $274,928. 
Cost of this work was financed from tolls collected from 
users of the facility. 
205 451-584 0-72-14

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end of fiscal year. Existing project is about 
75 percent complete. For details of construction on 
portion of existing project completed prior to fiscal year 
1966, see Annual Report for 1965. Since 1965; 
construction of 45 -foot channel from Fort Wool to 
Norfolk and Western Railway Company coal piers 
commenced March 1966 and was completed in August 
1967. Construction of turning basin in 35 -foot channel 
opposite St. Julians Creek commenced June 1966 and 
was completed in July 1966. Construction of 40 -foot 
channel between Norfolk and Portsmouth Belt Line 
Railroad Bridge and Norfolk and Western Railway 
Bridge commenced June 1968 and was completed in 
July 1968. Work remaining to complete project consists 
of dredging two anchorages opposite Sewells Point to 
45 feet deep. 
Annual maintenance dredging is being done to 
maintain controlling depths of 45' feet from Hampton 
Roads to Lambert Point and 40 feet from Lambert 
Point to Old Virginian Railway Bridge. Periodic 
maintenance dredging is being done to maintain a 35- 
foot controlling depth from Old Virginian Railway 
Bridge to a point 2,500 feet above Norfolk and Western 
Railway Bridge. Controlling depths (July 1958) in 
mid- channel for half- project width in Eastern Branch 
are 25 feet from junction of branches to Norfolk and 
Western Railway Bridge and 23.1 feet from Norfolk 
and Western Railway Bridge to Old Virginia Railway 
Bridge. Controlling depths (August 1957) in midchannel 
for half- project width in Western Branch are 
16.5 feet from mouth to West Norfolk Highway Bridge 
and 18 feet from West Norfolk Highway Bridge to a 
point 3,000 feet upstream. Controlling depth 
(December 1948) in mid- channel for half- project 
width in Scotts Creek is 7.4 feet. 
Total cost of existing project to June 30,1970 was 
$47,213,995 of which $24,932,375 was for new work 
($24,882,397 regular funds and $49,978 emergency 
relief funds), and $22,281,620 regular funds for 
maintenance. 
5C. THIMBLE SHOAL CHANNEL, VA. 
Location. In lower portion of Chesapeake Bay 
between Hampton Roads and the ocean, 20 miles 
northeast of center of Norfolk Harbor, extending 
southeasterly 12 miles from a point 1.25 miles east of 
Thimble Shoal Lighthouse toward entrance to 
Chesapeake Bay. (See Coast and Geodetic Survey 
Chart 1222.) 
Previous projects. For details see Annual Report for 
1932. 
Existing project. Provides for dredging a channel 12 
miles long, 1,000 feet wide, and 45 feet deep at mean 
low water with auxiliary channels 450 feet wide and 32 
feet deep at mean low water adjoining each side of 1, 
000- foot channel. Under ordinary conditions mean 
tidal range is 2.5 feet and extreme 3 feet. Extremes of 
irregular fluctuation, due to combined wind and tides, 
referred to mean low water, are minus 3 feet and plus 7 
feet. ("See Table 5-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. Project serves as an entrance 
channel to Hampton Roads. See "Norfolk Harbor, 
Va.," "Channel to Newport News, Va.," etc. 
Operations and results during fiscal year. New work 
dredging, to deepen the main channel to a depth of 45 
feet, was resumed by U. S. Hopper Dredge Essayons on 
October 1, 1969 and was completed on May 5, 1970. In 
addition, new work dredging was accomplished by U. 
S. Hopper Dredge Goethals on July 1, 1969 and from 
December 16 to December 18,1969. There were 
removed 1,772,061 cubic yards of material, place 
measure, at a direct cost of $1,766,585. New work 
engineering and design and supervision and 
administration amounted to a cost ofx$347,365. 
Maintenance dredging, with U. S. Hopper Dredge 
Goethals in the outbound half of the channel, was 
commenced January 23 and completed March 11, 
1970. There were removed 358,960 cubic yards of 
material at a direct cost of $249,559. Maintenance 
engineering and design and supervision and 
administration amounted to a cost of $32,859. 
Condition at end of fiscal year. Existing project is 
complete except for auxiliary channels which are in an 
inactive status. Construction of channel 750 feet wide 
and 40 feet deep was commenced in December 1917 
and completed June 1929. Widening this channel to 1, 
000 feet at same depth was commenced in February 
and completed in April 1957. Deepening this channel 
to 45 feet commenced December 1965 and was 
completed in May 1970. 
Periodic maintenance dredging is being conducted 
to maintain a 45- foot controlling depth in the 1,000- 
foot wide main channel. Controlling depths (March 
1958) in side channels are 28.8 feet in South auxiliary 
channel and 30 feet in North auxiliary channel. Total 
cost of existing project to June 30, 1970 was $13,641, 
916, of which $11,349,404 was for new work and $2, 
292,512 for maintenance. 
6. JACKSON CREEK, VA. 
Location. Jackson Creek, in Middlesex County, Va., is 
a tidal estuary flowing southerly and entering 
Piankatank River 1.5 miles upstream of the mouth at 
Chesapeake Bay. (See U. S. Coast and Geodetic Survey 
Chart No. 534.) 
Existing project. The project provides an entrance 
channel 2,640 feet long and 8 feet deep at mean low 
water with a width of 60 feet increased to 80 feet at the 
outer end. (See Table 5-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 22 small privately owned 
piers with rental stalls, two marine railways and one 
county owned public pier located in Jackson Creek. 
206

NORFOLK, VA., DISTRICT 
Operations and results during fiscal year. Operation of the 
project including inspections and reports amourited to 
a cost of $410. Maintenance engineering and design 
and supervision and administration for a dredging 
contract amounted to a cost of $2,929. A portion of the 
contractor's mobilization amounted to a cost of $893. 
The dredging will be accomplished in fiscal year 1971. 
Condition at end of fiscal year. The project was 
constructed from February to March 1937. No 
maintenance dredging has been necessary until the 
work now underway. Controlling depth in November 
1969 was 7.6 feet. 
7. JAMES RIVER, VA. 
Location. Formed by junction of Cowpasture and 
Jackson Rivers in Botetourt County, Va., flows easterly 
340 miles, and empties into Hampton Roads at 
Newport News, Va. (See Coast and Geodetic Survey 
Charts 529, 530, and 531.) 
Previous projects. For details see Annual Report for 
1915. 
Existing project. A channel 35 feet deep and 300 feet 
wide from mouth to Richmond Deepwater Terminal; 
and thence a channel 18 feet deep and 200 feet wide 
from Deepwater Terminal to Richmond lock; a 
mooring basin 35 feet deep, 180 to 220 feet wide, and 2, 
100 feet long alongside channel opposite waterfront at 
Hopewell; enlargement of turning basin at Richmond 
Deepwater Terminal to 825 feet wide, 2,770 feet long, 
and 35 feet deep; a turning basin in Richmond Harbor 
200 feet wide, 600 feet long and 18 feet deep; and 
construction of spur and training dikes. Depths of 
channels are referred to mean low water. Total length 
of channel included in project is 87 miles, which is the 
navigable section. Mean tidal ranges under ordinary 
conditions for different parts of river; Mouth, 2.6 feet; 
Jamestown, 2 feet; City Point, 2.6 feet; Richmond, 3.2 
feet. Spring tide ranges under ordinary conditions at 
same localities; Mouth, 3.1 feet; Jamestown, 2.4 feet; 
City Point, 3 feet; Richmond, 3.2 feet. Ordinary 
fluctuations of stage at Richmond, due to floods, are 6 
to 12 feet above mean low water. Extreme fluctuations 
are 16 to 32 feet. Flood heights below Richmond 
diminish rapidly, the extreme, according to available 
information, is about 11 feet lower at Dutch Gap, 14 
miles below, and 17 to 18 feet lower 20 miles below. 
Estimated Federal cost for new work (1970) is $60,796, 
000. (See Table 5-B for authorizing legislation.) 
Local cooperation. Fully complied with for conditions 
imposed by River and Harbor Acts of 1930, 1945, and 
1950. Total estimated cost for all requirements of local 
cooperation under terms of these authorized acts, 
including non- Federal contributions, was $1,949,700 
(1939). River and Harbor Act of 1962, imposed 
conditions that local interests furnish lands and rightsof- 
way for construction and future maintenance and 
aids to navigation upon request of Chief of Engineers, 
including suitable spoil -disposal areas, necessary 
retaining dikes, bulkheads, and embankments therefor 
or cost of such retaining works; hold the United States 
free from damages including damages to public or 
private oyster and clam grounds, and damages 
resulting from any change in natural course of James 
River, from blasting operations during removal of rock, 
or from changes in ground- water levels; hold the 
United States free from claims for costs resulting from 
provision and operation of bridges or ferries that may 
be required between mainland and any islands created 
by channel cutoffs; alter or relocate roads, bridges, 
waterfront structures, sewer, water supply, storm 
drainage, electric power, and other utility facilities; 
provide, maintain, and operate adequate terminal and 
transfer facilities to accommodate foreign and domestic 
commerce expected to develop from improved 
channel; and provide and maintain depths in berthing 
and mooring areas adjacent to terminals 
commensurate with related project depth. These 
conditions have not been complied with. Local interests 
(City of Richmond) indicated their willingness to 
provide necessary assurances when required to do so. 
Terminal Facilities. River's commerce at Richmond is 
handled at city- owned terminals, city wharf, 
Richmond dock, and at 16 private owned wharves 
within or in immediate vicinity of Richmond Harbor. 
The city's upper terminal located on the north bank 
within the manufacturing section of Richmond 
provides for 750 feet of concrete wharf and 80,000 
square feet of warehouse and transit shed. The other 
terminal is located approximately 4 miles downstream 
from the Upper Terminal which provides about 1250 
feet of wharf and 2 concrete warehouses with about 
190,000 square feet of floor space. This deepwater 
terminal at head of the 25- foot deep improved channel 
serves ocean- going vessels and larger ships engaged in 
coastwide trade. Below deepwater terminal the 
improvement is served by 42 wharves. Richmond 
terminals and wharves, together with wharves between 
Richmond and the river's mouth, are adequate for 
river's commerce. 
Operations and results during fiscal year. Operation of the 
project including model studies, condition surveys, 
inspection and reports cost $184,905. A contract was 
awarded April 20, 1970 for maintenance dredging the 
18- and 25-foot channels. Dredging will be 
accomplished in fiscal year 1971. Maintenance buoy 
service, real estate activities, engineering and design 
and supervision and administration amounted to a cost 
of $34,603. 
Condition at end of fiscal year. Construction of existing 
project commenced in 1884 and continued 
intermittently through various modifications until 25- 
foot and 18- foot channels were completed in 
November 1947. See Annual Report for 1965 for 
details on completion dates. Annual maintenance 
dredging is being done to maintain 18 and 25- foot 
controllingdepths on the project. Work remaining to 
complete project consists of deepening channel from 25 
to 35 feet from mouth to Richmond Deepwater 
Terminal and widening to 300 feet between Hopewell 
and Deepwater Terminal. Also remaining is 
207

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
construction of mooring basin at Hopewell and 
enlargement of turning basin at Richmond Deepwater 
Terminal. Total cost of existing project to June 30, 
1970, was $17,640,927, of which $6,796,240 was for 
new work ($6,212,404 regular funds and $583,836 
public works funds) and $10,844,687 for maintenance 
($838 applied to removal of shoals in Bennetts Creek, 
Va., under provisions of section 3, River and Harbor 
Act of 1940). In addition, $60,183 expended from 
contributed funds for maintenance. 
8. LYNNHAVEN INLET, VA. 
Location. On south shore of Chesapeake Bay, 5 miles 
west of Cape Henry, and 10 miles east of Norfolk; Va. 
Inlet connects Lynnhaven Roads, a part of Chesapeake 
Bay, with a network of inland waters in northern half 
of city of Virginia Beach. (See Coast and Geodetic 
Survey Chart 1222.) 
Existing project. An entrance channel from 
Chesapeake Bay through Lynnhaven Inlet, 10 feet 
deep and 150 feet wide; a mooring and turning basin, 
inside of Lynnhaven Inlet, 10 feet deep, 1,100 feet long, 
and 750 feet wide; a channel 9 feet deep and 90 feet 
wide to extend from the mooring and turning basin 
into Broad Bay, via Long Creek-Broad Bay Canal; and 
a channel through the Narrows, connecting Broad and 
Linkhorn Bays, 6 feet deep and 90 feet wide. Depths 
are referred to mean low water. Mean range of tide in 
Lynnhaven Inlet is about 2 feet with extreme 
fluctuations of 1.5 feet below and 9.5 feet above mean 
low water. Range in Lynnhaven Bay is a little more 
than 2 feet. In Broad and Linkhorn Bays, fluctuations 
in water level are caused by local winds. (See Table 5-B 
for authorizing legislation.) 
Local cooperation. Complied with except local interests 
must furnish spoil- disposal areas as needed for future 
maintenance. 
Terminal facilities. A number of small privatelyowned 
wharves and landings are on the project used for 
commercial seafood businesses and recreational 
boating. Construction of commercial and recreational 
terminals required of local interests as a part of the 
local cooperation has been completed. These facilities 
are considered adequate for the existing and future 
commercial traffic. A municipal marina with mooring 
space for 50 recreational boats has been constructed. 
The project serves as a deep water access for hundreds 
of privately-owned residential small boat facilities. 
Operations and results during fiscalyear. Operation of the 
project including condition surveys, inspection and 
reports cost $3,171. A contract was awarded April 7, 
1970 for maintenance dredging the entrance channel, 
turning basin and connecting channels. Dredging will 
be accomplished in fiscal year 1971. Maintenance 
engineering and design and supervision and 
administration amounted to a cost of $12,046. 
Condition at end of fiscal year. Construction of existing 
project was commenced in July 1965 and completed in 
January 1966. Periodic maintenance dredging is being 
done at regular intervals to maintain full project 
dimensions. Controlling depths (November 1969) in 
middle one- half of channel were 8.5 feet in entrance 
channel and 6.4 feet in channel to Broad Bay. 
Controlling depth (August 1969) in channel through 
the Narrows was 6 feet. 
9. RAPPAHANNOCK RIVER, VA. 
Location. Rises in Blue Ridge Mountains in Virginia, 
and flows southeasterly about 212 miles to enter 
Chesapeake Bay, about 40 miles north of Old Point 
Comfort, Va. (See Coast and Geodetic Survey Charts 
534, 535, and 536.) 
Previous projects. For details, see Annual Report for 
1915. 
Existing project. A channel 12 feet deep and 200 feet 
wide between mouth and Port Royal and 12 feet deep 
and 100 feet wide between Port Royal and 
Fredericksburg by dredging and construction of 20,401 
feet of crib and pile dikes and 1,906 feet of riprap stone 
dikes, designed to retain excavated material deposited 
behind them. Waterway included in project is 107 
miles long. Plane of reference is mean low water. Tidal 
ranges are; Mean, 2.8 feet at Fredericksburg, 1.6 feet at 
Tappahannock; irregular, 3.5 feet at Fredericksburg, 
2.5 feet at Tappahannock; extreme, 6 feet at 
Fredericksburg, 5 feet at Tappahannock. Federal cost 
for new work for completed project was $217,487, 
exclusive of amounts expended under previous projects. 
(See Table 5-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. In the 65- mile section extending 
from Fredericksburg, Va., to Tappahannock, Va., 
there are 26 wharves, of which nine are solid bulkhead 
type and 17 are open- pile structures. From 
Tappahannock to mouth there are 15 open- pile 
wharves. Most wharves are open to the public. 
Terminals are considered adequate for existing 
commerce. 
Operations and results during fiscalyear. Operation of the 
project including condition surveys, inspections and 
reports amounted to a cost of $9,329. Maintenance 
dredging, by contract, commenced June 13 and was 
completed June 29, 1970. There were removed 123,788 
cubic yards of material, place measure, at a direct cost 
of $94,646. $43,122 of this cost will be paid the 
contractor in fiscal year 1971. Preparations were made 
for bank trimming and snagging operations, to be 
accomplished early in fiscal year 1971, with 
Government plant and hired labor, at a direct cost of 
$962. Maintenance engineering and design and 
supervision and administration amounted to a cost of 
$11,048. 
Condition at end of fiscal year. Existing project was 
started July 1908 and completed April 1910. 
Controlling depths were 10.3 feet (August 1957) at 
Castle Ferry Bar and 6.2 feet (Mar. 1964) at 
Fredericksburg Bar. Total cost of existing project to 
208

NORFOLK, VA., DISTRICT 
June 30, 1970, was $1,881,189 of which $217,487 was 
for new work, $168,091 for rehabilitation, and $1,495, 
611 for maintenance (includes $995 for Parrotts Creek, 
and $1,000 each for Greenvale, Mill, Beach, and 
Queens Creek). In addition, $600 for maintenance was 
expended from contributed funds on Queens Creek. 
10. STARLINGS CREEK, VA. 
Location. A small estuary tributary to Pocomoke 
Sound on eastern side of Chesapeake Bay, adjacent to 
town of Saxis, Va., in Accomack County about 11 miles 
southeast of Crisfield, Md. (See Coast and Geodetic 
Survey Charts 1223 and 1224.) 
Existing project. A channel 7 feet deep at mean low 
water and 60 feet wide from that depth in Pocomoke 
Sound to mouth of Starlings Creek, thence a turning 
basin of same depth, 100 feet wide and 1,000 feet long, 
and thence an approach channel 60 feet wide 
connecting the turning basin with a harbor of refuge, 7 
feet deep, 200 feet wide, and 500 feet long. Mean range 
of tide is 2.4 feet. (See Table 5-B for authorizing 
legislation.) 
Local cooperation. Complied with except local interests 
must furnish spoil- disposal areas as needed for future 
maintenance. 
Terminal facilities. A public dock with 650 feet of 
berthing space and six commercial seafood docks 
within the creek. With construction of public dock 
required of local interests within harbor of refuge, these 
facilities are considered adequate. 
Operations and results during fiscal year. Maintenance 
dredging, by contract, in the entrance channel and 
turning basin, commenced June 1, 1970 and was in 
progress at the end of the fiscal year. There were 
removed 34,000 cubic yards of material, place measure, 
at a direct cost of $35,966. Maintenance engineering 
and design and supervision and administration 
amounted to a cost of $9,466. 
Condition at end of fiscal year. Entrance channel and 
turning basin were completed in 1937. Construction of 
approach channel and harbor of refuge began in 
August and was completed in September 1965. 
Controlling depths determined in May and June 1970 
are 7 feet in entrance channel, 4.3 feet in turning basin, 
3 feet in approach to harbor of refuge and 6.8 feet in 
harbor of refuge. 
11. SUPERVISION OF HARBOR OF 
HAMPTON ROADS, VA. (PREVENTION 
OF OBSTRUCTIVE AND INJURIOUS 
DEPOSITS) 
Laws enacted for preservation of Harbor of 
Hampton Roads, Va., its adjacent and tributary 
waters, so much of Chesapeake Bay and its tributaries 
as lies within State of Virginia, and so much of the 
Atlantic Ocean and its tributaries as lies within 
jurisdiction of the United States, within or to the east of 
the State of Virginia, are administered by the 
Supervisor of the Harbor of Hampton Roads. Laws 
relating to supervision of Harbor of Hampton Roads 
are the act of June 29, 1888 (25 Stat. 209) as amended 
by section 3, River and Harbor Act of 1894 (28 Stat. 
360), section 8, River and Harbor Act of 1908 (35 Stat. 
424, 426), act of February 16, 1909 (35 Stat. 623) and 
act of July 12, 1952 (66 Stat. 596); section 2, River and 
Harbor Act of 1894 (28 Stat. 360) and as amended 
August 28, 1958 (72 Stat. 970); act of March 3, 1899 
(Refuse Act, 30 Stat. 1152); act of August 30, 1961 (Oil 
Pollution Act, 75 Stat. 402); The Federal Water 
Pollution Control Act of 1956, as amended; and the 
Water Quality Improvement Act of 1970. Supervision 
was exercised by means of two patrol vessels (423 
patrols, 2,783 man- hours) and three patrol cars (581 
patrols, 4,731 man- hours). Commercial airplanes and 
U. S. Coast Guard helicoptors were utilized to patrol 
the Hampton Roads and Norfolk Harbor areas and 
offshore from beaches along Atlantic Ocean and 
Chesapeake Bay especially during beach resort season. 
Patrols were maintained to detect illegal deposit into 
navigable waters of waste oil, sludge, refuse, and other 
types of debris from vessels and shore installations. An 
intensive educational program continued with a view 
to preventing violations of applicable Federal Acts. 
This program was effected through press releases, 
public talks, public notices, and personal interviews 
with interested agencies, committees, and private 
industries. Circular letters were forwarded to fuel oil 
firms, railroad companies, shipping companies and 
agencies, inviting their support in the antipollution 
campaign. Agreements were reached with various 
Federal, State, and local agencies having related or 
similar responsibilities and functions to obtain 
maximum results with minimum costs by eliminating 
duplication of effort. 
Summary of legal action during fiscal year; 
Disposition of legal actions to end of fiscal year for 
violations of act of June 29, 1888, as amended, Refuse 
Act of March 3, 1899, Oil Pollution Act of 1924 and 
Oil Pollution Act of 1961 is as follows; 26 cases reported 
to U.S. Attorney for prosecution; 9 convictions 
obtained or settled by compromise; no cases nolle 
prosse or discontinued; no cases dismissed after trial; 
and 23 cases pending June 30,1970. 
Summary of investigations of pollution violations not 
warranting prosecutions, i.e., accidental in nature, 
insufficient evidence for prosecution or necessary 
corrective measures taken (warning letters issued or 
other necessary enforcement action taken) during fiscal 
year was 151. 
12. TANGIER CHANNEL, VA. 
Location. A tidal channel about 1 mile long, 
extending from Tangier Island, Va., northeasterly to 
deep water in Tangier Sound, Chesapeake Bay. (See 
Coast and Geodetic Survey Chart 1223.) 
209

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Existing project. A channel 8 feet deep at mean low 
water and 100 feet wide from 8 -foot contour in Tangier 
Sound to day marker No. 4, and thence 8 feet deep and 
60 feet wide to town of Tangier, with an anchorage 
basin adjacent to town 400 feet square and 7 feet deep. 
A channel 7 feet deep and 60 feet wide for about 4,000 
feet from the anchorage basin northwesterly across 
Tangier Island to Chesapeake Bay. Mean range of tide 
is 1.7 feet and extreme tidal range is 4.7 feet. (See Table 
5-B for authorizing legislation.) 
Local cooperation. Complied with except local interests 
must furnish spoil- disposal areas as needed for future 
maintenance. 
Terminal facilities. Accomack County constructed a 
public dock in 1961. There are four privately- owned 
docks adjacent to existing project and two marine 
railways. Facilities are considered adequate for existing 
and prospective commerce. 
Operations and results during fiscal year. Maintenance 
dredging, by contract, commenced August 2 and was 
completed August 25, 1969. There were removed 78, 
528 cubic yards of material, place measure, at a direct 
cost of $66,245. Maintenance supervision and 
administration costs amounted to $7,924. 
Condition at end of fiscal year. Channel from Tangier 
Sound to anchorage basin at Tangier was completed in 
1948. Construction of channel across Tangier Island 
began in December 1965 and was completed in 
January 1966. Controlling depths at mean low water 
were 8 feet in approach channel from Tangier Sound 
and 7 feet in the basin (August 1969); and 7 feet 
(August 1969) in channel across island. 
13. TOTUSKEY CREEK, VA. 
Location. In Richmond County, Va., flows southerly 
about 15 miles to Rappahannock River, which it enters 
on the left bank about 35 miles upstream from its 
mouth. Creek is 97 miles northerly of Norfolk, Va. (See 
Coast and Geodetic Survey Chart 535.) 
Existing project. A channel 10 feet deep from that 
depth in Rappahannock River to and including a 
turning basin below Totuskey Bridge, 4.5 miles 
upstream, with a width of 150 feet through the bar at 
entrance and 100 feet thence upstream, suitably 
widened at bends, and construction of a dike at Booker 
Bar. Plane of reference is mean low water. Tidal ranges 
are; Mean, 1.6 feet at mouth and 2 feet at Totuskey 
Bridge; irregular, 2 feet at mouth and 2.5 feet at 
Totuskey Bridge; and extreme, about 7.5 feet at mouth. 
(See Table 5-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Two county- owned wharves and 
13 privately-owned wharves or landings. Facilities are 
considered adequate for existing and future commerce. 
Operations and results during fiscal year. Maintenance 
dredging, by contract, commenced August 26 and was 
completed September 22, 1969. There were removed 
235,431 cubic yards of material, place measure, at a 
direct cost of $98,573. Maintenance supervision and 
administration costs amounted to $14,783. 
Condition at end of fiscal year. Existing project as 
modified in 1945 was started in July and completed in 
September 1956. Controlling depth (September 1969) 
is 10 feet. 
14. TYLERS BEACH, VA. 
Location. On south shore of James River in Isle of 
Wight County in a deep indentation known as 
Burwells Bay about 13 miles above the mouth of the 
James River. (See Coast and Geodetic Survey Chart 
529.) 
Existing project. Provides for a harbor of refuge 6 feet 
deep, 150 feet wide, and 300 feet long in the marsh area 
south of Tylers Beach and a channel 6 feet deep, 50 feet 
wide, and about 2,350 feet long from that depth in 
Burwells Bay to harbor of refuge. Mean range of tide is 
2.4 feet. (See Table 5-B for authorizing legislation.) 
Local cooperation. Complied with except local interests 
must furnish spoil-disposal areas as needed for future 
maintenance. 
Terminal facilities. Local interests are constructing the 
public landing in the harbor of refuge. With the 
completion of this landing, the facilities will be 
adequate for existing and reasonably prospective 
traffic. 
Operations and results during fiscal year. Maintenance 
dredging, with Government plant and hired labor, in 
the channel at the entrance to the harbor of refuge, was 
accomplished in May 1970 at a cost of $722. This work 
was done on an emergency basis to permit use of the 
project. The undetermined amount of material 
removed was sufficient to permit use of the harbor by 
small boats. Condition surveys were made during the 
year at a cost of $3,425. 
Condition at end of fiscal year. New work dredging of the 
project commenced in June and was completed in July 
1968. Controlling depths are 2.4 feet (April 1970) in 
the entrance channel and 6 feet (March 1969) in the 
mooring basin. 
15. WATERWAY ON THE COAST OF 
VIRGINIA 
Location. Between barrier beach along Atlantic 
Ocean on the east and Virginia portion of mainland 
peninsula on the west. It extends from south end of 
Chincoteague Bay through a number of creeks, 
thoroughfares and bays, to enter Chesapeake Bay in 
vicinity of Fisherman Island, just south of Cape 
Charles, the southern tip of the peninsula, for 83.7 
miles. (See Coast and Geodetic Survey Charts 1220, 
1221, and 1222.) 
Existing project. An inland waterway 6 feet deep and 
60 feet wide from Chesapeake Bay to Chincoteague 
Bay, Va. Mean range of tide is about 3 feet. Greater 
210

NORFOLK, VA., DISTRICT 
fluctuations in water level are caused by high winds 
and storms. (See Table 5-B for authorizing legislation.) 
Local cooperation. Complied with except local interests 
are to furnish spoil- disposal areas for future 
maintenance. 
Terminal facilities. Larger towns in the area adjacent 
to the route of improvement have fairly substantial 
pile- and- timber wharves which are used primarily by 
boats engaged in seafood business. A number of small 
landings are scattered along the shore between towns. 
There are also wharves at Coast Guard stations in the 
area. All wharves are privately owned, but open to the 
public for transaction of business with the owners. No 
mechanical freight- handling facilities are available. 
Terminals are adequate for existing commerce. 
Operations and results during fiscalyear. Operation of the 
project including condition surveys, inspections and 
reports amounted to a cost of $37,360. Maintenance 
dredging, by contract, in progress at the beginning of 
the fiscal year was completed on August 3, 1969. There 
were removed 167,455 cubic yards of material, place 
measure, at a direct cost of $81,203. 
Maintenance dredging, by contract, commenced 
May 20, 1970 and was in progress at the end of the 
fiscal year. There were removed 75,000 cubic yards of 
material, place measure, at a direct cost of $72,073. 
Maintenance engineering and design and supervision 
and administration amounted to a cost of $37,360. 
Condition at end of fiscal year. Existing project was 
completed in 1959. Annual maintenance dredging is 
being done to maintain full project dimensions. 
16. WISHART POINT CHANNEL, VA. 
Location. In Accomack County, about 5 miles 
southeast of Chincoteague Island and 3.5 miles east of 
the town of Temperanceville, near the Waterway on 
the Coast of Virginia. (See Coast and Geodetic Survey 
Chart 1221). 
Existing project. Provides for a channel 6 feet deep and 
60 feet wide from the Waterway on the Coast of 
Virginia at the Four Mouths, through Ballast Narrows 
and across Powells Bay to Wishart Point, about 2 miles 
in length. Estimated cost (1969) for new work is $83, 
500 including $24,900 non- Federal. (See Table 5-B for 
authorizing legislation.) 
Local cooperation. Local interests must provide spoildisposal 
areas, oyster releases, a public landing, 
maintenance of the bulkheads and banks beside boat 
basin and channel, shore sanitary facilities and an 
adequate parking area; make a cash contribution 
equal in amount to 17.7 percent of the first cost of 
dredging; and assume all costs in excess of $500,000. 
The Accomack County Board of Supervisors has 
agreed to furnish the items of local cooperation. 
Terminal facilities. There are no terminal facilities at 
Wishart Point other than a boat club owned and 
operated by local waterman and a launching ramp and 
parking area constructed by the state and open to the 
public. With provision of the public landing required of 
local interests, facilities will be adequate for existing 
and prospective traffic. 
Operations and results during fiscal year. Official state 
endorsement of the project was obtained in October 
1969. Concerned members of Congress and local 
interests were notified of the project's approval and 
adoption. 
Condition at end of fiscal year. Construction has not 
begun. 
17. RECONNAISSANCE AND CONDITION 
SURVEYS. 
(See Table 5-D at end of chapter.) 
18. OTHER AUTHORIZED NAVIGATION 
PROJECTS. 
(See Table 5-E at end of chapter.) 
19. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION. 
Navigation Activities Pursuant to Section 107, Public Law 
645, 86th Congress (Preauthorization) 
Five reconnaissance reports were underway during 
the fiscal year; Grays Creek, Surry County, Va., at a 
cost of $1,419; Meachim Creek, Middlesex County, 
Va., at a cost of $783; Onancock River, Accomack 
County, Va., at a cost of $1,100; Oyster Channel, 
Northampton County, Va., at a cost of $50; and Sterns 
Creek, Portsmouth, Va., at a cost of $1,077. 
A detailed project report, Front Cove, Poguoson, 
Virginia was underway during the fiscal year at a cost 
of $587. 
A favorable reconnaissance report, Taskinas Creek, 
James City County, Virginia was submitted during the 
fiscal year at a cost of $133. 
One project, Wishart Point Channel, Accomack 
County, Virginia was approved for construction during 
the fiscal year at a cost of $322. 
BEACH EROSION CONTROL 
20. VIRGINIA BEACH, VA. 
Location. On Atlantic seaboard, 22 miles north of 
Virginia-North Carolina State line, 3.5 miles south of 
Cape Henry, and 19 miles east of Norfolk, Va. (See 
Coast and Geodetic Survey Chart 1227.) 
Existing project. Federal participation in restoration 
and protection of shore of Virginia Beach by artifical 
placement of sand to provide a minimum beach width 
of 100 feet at elevation 7 feet above mean low water, 
and maintenance of such beach by periodic 
replenishment of losses to insure continuous protection; 
including construction of a groin system to be 
undertaken at such times as estimated annual charges 
therewith would be less than the annual cost of beach 
211

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
replenishment alone. The United States shall 
participate in the first cost of the project to the full 
extent of its proportionate share of cost as a landowner, 
plus one-third total first cost of restoring and 
protecting all publicly owned section of the shore. 
United States shall further participate in periodic 
beach nourishment of the beach in the amount of onehalf 
the costs for 25 years from date of commencement 
of operations in placing an initial quantity of 
nourishment material equal to deficiency in the design 
beach at that time. Estimated Federal cost (1970) is $1, 
859,600. Estimated cost to city of Virginia Beach is $2, 
115,700. 
Construction of the groin system is not included in 
above estimate. The 1962 estimate for this work was 
$549,000 Federal cost and $531,000 cost to city of 
Virginia Beach. (See Table 5-B for authorizing 
legislation.) 
Local cooperation. River and Harbor Act of September 
3, 1954, imposed conditions that local interests adopt 
plan of restoration and protection; submit for approval 
by the Chief of Engineers, before commencement of 
work, detailed plans and specifications for the project 
and also arrangements for prosecuting the work; assure 
maintenance of protective and improvement 
measurements during their useful life as may be 
required to serve their intended purpose; provide all 
lands and rights- of- way; hold the United States free 
from damages; assure that water pollution that would 
endanger the health of bathers will not be permitted; 
and assure continued public ownership of the shore 
upon which the amount of Federal participation is 
based, and its administration for public use only. These 
conditions of local cooperation, pertaining to beach 
restoration have been met and approved by the Chief 
of Engineers. Conditions pertaining to construction of 
groins have not been complied with. 
Operations and results during fiscal year. Reimbursed city 
of Virginia Beach for Federal share of periodic 
nourishment of the beach and Federal costs pertinent 
thereto. Condition surveys amounted to an additional 
cost of $114. 
Condition at end offiscalyear. Project is about 37 percent 
complete. Beach restoration by city of Virginia Beach 
was commenced in June 1952 and completed in August 
1953. Construction of groins has been deferred 
indefinitely. Local interests periodically replenished 
beach material, as needed, in an effort to bring it to 
designated height and width of berm. At end of fiscal 
year the beach had an average width of about 50 feet at 
elevation 7 feet above mean low water. Local interests 
acquired their own dredging plant and adequate 
borrow areas and are replenishing the beach. 
21. BEACH EROSION CONTROL WORK 
UNDER SPECIAL AUTHORIZATION. 
Beach Erosion Control Activities Pursuant to Section 
103, Public Law 645, 86th Congress 
(Preauthorization) 
A reconnaissance report, b Tangier Island, 
Chesapeake Bay, Virginia was underway during the 
fiscal year at a cost of $557. 
FLOOD CONTROL 
22. GATHRIGHT RESERVOIR, JAMES 
RIVER BASIN, VA. 
Location. Site of proposed Gathright Dam is on 
Jackson River, a tributary of James River, at mile 43.4 
in Alleghany County. Gathright Dam site is in reach of 
Jackson River known as the Gorge, about 19 miles 
upstream from Covington, Virginia. At the elevation of 
the top of the conservation pool, Gathright Reservoir 
will extend upstream about 9 miles. (See Falling Spring 
and Mountain Grove, Va.-W. Va., quadrangles of 
Geological Survey.) 
Existing Project. The Gathright Dam consists of a 1, 
172- foot- long, rolled- rock- fill dam with an 
impervious core with the top at elevation 1684.5; outlet 
works consisting of a concrete intake structure located 
in the right bank 500 feet upstream from the axis of the 
dam, a 1,075- foot- long outlet tunnel through the right 
abutment and a stilling basin; and a 2,450- foot-long, 
fixed- crest emergency spillway excavated in a low 
saddle in the divide at Fortney Branch about 2.5 miles 
south of the dam. Discharges through the outlet tunnel 
will be controlled by slide gates located in the intake 
structure. The reservoir at minimum conservation pool 
elevation 1554 will have an area of 1,780 acres. About 
60,700 acre- feet of storage between elevation 1554 and 
maximum conservation pool elevation 1582 will be 
provided for water quality control. The reservoir area 
at elevation 1582 will be 2,530 acres. A total of 302,300 
acre- feet of storage between elevation 1582 and the 
spillway crest (elevation 1668.5) will be reserved for 
flood control. At the spillway crest the reservoir will 
have an area of 4,540 acres. Estimated Federal cost 
(1970) is $27,020,000 for construction and $2,880,000 
for lands and damages, including highway, cemetery 
and utility relocation, a total of $29,900,000 for new 
work. (See Table 5-B for authorizing legislation.) 
Local cooperation. None required. 
Operations and results during fiscal year. Real estate 
activities and acquisition continued at a direct cost of 
$39,710. A contract for grading and temporary 
surfacing of the access road commenced in October 
1969 and was nearly complete at the end of the fiscal 
year at a direct cost of $372,408. A contract for the 
outlet works, including intake tower, tunnel and 
stilling basin, was awarded in June. Work on the 
contract will be initiated in fiscal year 1971. 
212

NORFOLK, VA., DISTRICT 
Engineering and design, by hired labor, continued at 
a direct cost of $463,176. Miscellaneous hired labor 
work and construction facilities amounted to a direct 
cost of $3,924. Supervision and administration of the 
project amounted to a cost of $125,191. 
Condition at end of fiscal year. The overall project is 
about 18 percent complete. Construction is in the early 
stages. Clearing and stripping at the dam site is 
complete. Construction of the access road is nearly 
complete. Acquisition of real estate is continuing. 
23. NEWMARKET CREEK, VA. (LOCAL 
FLOOD PROTECTION) 
Location. On Lower Peninsula of Virginia with its 
upper channel forming a portion of the boundary 
between cities of Hampton and Newport News. Creek 
flows southerly from a point about 3 miles west of 
Langley Air Force Base, then turns generally east, 
northeast and finally north, roughly paralleling James 
River and Hampton Roads shoreline and empties into 
southwest branch of Back River, a tributary of 
Chesapeake Bay. (See Geological Survey Sheet 
"Morrison, Va.") 
Existing project. Improvement of the Channel of 
Newmarket Creek from vicinity of Dresden Drive in 
Newport News to U.S. Highway 258 and improvement 
of entire length of Government Ditch. A dam across 
Newmarket Creek would divert floodwaters from the 
creek into Government Ditch and thence to the James 
River. (See Table 5-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. The contract for 
construction of the project, initiated in August 1967, 
was completed in December 1969. The project was 
turned over to the cities of Hampton and Newport 
News for operation and maintenance in March 1970. 
Condition at end offiscalyear. Completed. 
24. NORFOLK, VA. (LOCAL FLOOD 
PROTECTION) 
Location. On port of Hampton Roads, 180 miles south 
of Washington, D.C., and about 20 miles west of 
confluence of Chesapeake Bay and Atlantic Ocean at 
Cape Henry. (See Coast and Geodetic Survey Charts 
452 and 1222.) 
Existing project. Provides for local protection from 
tidal flooding for central business district of city of 
Norfolk, located on Elizabeth River, a tidal estuary of 
Hampton Roads. It includes a concrete wall 2,750 feet 
long, averaging about 7 feet high above existing 
ground, with six closure structures; and pumping plant 
with three pumps of 33,000 gallons per minute capacity 
each at 8- foot head; and necessary alterations to 
streets, railroads, and utilities. Wall will protect against 
tides with a still water elevation of 10 feet above mean 
sea level with allowance for wave action. Estimated 
Federal cost (1970) for new work is $1,838,000. (See 
Table 5-B for authorizing legislation.) 
Local cooperation. Local interests must provide all 
lands, and rights-of-way; make relocations and 
alterations of sewerage and drainage facilities, 
buildings, utilities and other structures (exclusive of 
storm sewer, street, and railroad alterations forming an 
integral part of the protective works); bear 30 percent 
of total first cost, exclusive of betterments, to consist of 
the above items and a cash contribution; bear entire 
cost of betterment items; hold the United States free 
from damages due to construction; and maintain and 
operate works in accordance with prescribed 
regulations. Formal assurances of cooperation were 
provided by an ordinance of the city council of Norfolk 
adopted July 30, 1963. 
The city has made cash contributions of $251,000 as 
its share of the pumping station and first increment of 
the floodwall, now complete. In addition, the city paid 
for the land acquisition, clearing and relocations 
necessary for the project. An additional contribution 
will be required for the final increment of the floodwall. 
The amount of this contribution will be determined by 
a review, currently in progress, of the city's project 
related costs. The city has contributed $25,000 toward 
the final increment pending the results of the review. 
Operations and results during fiscal year. Coordination of 
the final increment of the floodwall with the city's 
Waterfront Drive Project and acquisition and clearing 
of the remaining real estate by the city was completed. 
Construction of the final increment, by contract, began 
in April 1970 and was in progress at the end of the fiscal 
year. About 35 percent of the contract was completed 
at a direct cost of $219,948. Engineering and design 
and supervision and administration amounted to a cost 
of $25,563. 
Condition at end of fiscal year. The project is 79 percent 
complete overall. Construction of the pumping station 
and first increment of the floodwall began in 
September 1966, was completed in August 1968 and 
has been turned over to the City of Norfolk for 
operation and maintenance. The contract, now in 
progress, for construction of the final increment of the 
floodwall will complete the project. 
25. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION. 
Preauthorization Investigations. 
Flood control activities pursuant to Section 205, 
Public Law 858, 80th Congress, as amended. 
A reconnaissance report b Tarrara Creek, Boykins, 
Virginia was underway during the fiscal year at a cost 
of $1,825. 
Emergency Activities 
Emergency flood control activities-repair, flood 
fighting, and rescue work (Public Law 99, 84th Cong., 
and antecedent legislation.) 
213

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Fiscal year costs were $16,088 for advance 
preparation and $163,468 for emergency operations. 
Emergency operations, resulting from Hurricane 
Camille, were begun in August 1969 and continuing at 
the end of the fiscal year. The emergency work 
consisted of flood fighting ($9,103), post -flood report 
($67,300) and disaster assistance performed at the 
request of the Office of Emergency Preparedness ($87, 
065). 
MULTIPLE- PURPOSE PROJECTS 
INCLUDING POWER. 
26. SALEM CHURCH LAKE, VA. 
Location. The Salem Church multiple purpose 
reservoir, to be located on the Rappahannock and 
Rapidan Rivers in Spotsylvania, Stafford, Orange, 
Culpepper, and Fauquier Counties, Va., would be 
created by a concrete gravity dam on the 
Rappahannock River 5.6 miles above Fredericksburg, 
Va., and 113 miles above the mouth. At maximum 
power pool, the lake will extend about 26 miles 
upstream on the Rappahannock River and 24 miles on 
the Rapidan River. (See Geological Survey 
Quadrangles "Fredericksburg," "Salem Church," 
"Storck," "Midland," "Richardsville," "Chancellorsville," 
"Remington," "Germanna Bridge," 
"Mine Run," "Culpepper" and "Unionville.") A 
reregulating dam, Fredericksburg Dam, included in 
the project, will be located 2.8 miles downstream from 
the Salem Church Dam. 
Previous projects. For details see page 264 of Annual 
Report of 1954. 
Existing project. The project provides for construction 
of Salem Church Dam, including powerhouse and 
Fredericksburg Dam. Salem Church Dam consists of a 
concrete gravity dam, approximately 1,560 feet long 
with a maximum height of 203 feet above river bed, 
and earth embankments extending from both 
abutments, totaling 14,000 feet in length. The spillway, 
located in the concrete gravity section of the dam, is 
controlled by 9 crest gates 50 feet by 42 feet with a 
discharge capacity of 608,000 cubic feet per second. 
The powerplant, immediately downstream of the dam, 
contains two conventional generating units with a total 
installed capacity of 89,000 kilowatts. The lake will 
have a total storage capacity of 1,048,000 acre- feet. At 
conservation pool elevation of 240 feet above mean sea 
level the lake will have an area of 21,000 acres. 
Fredericksburg Dam reregulates the power flow 
released from Salem Church. It consists of a concrete 
ungated spillway with concrete non- overflow sections, 
1,115 feet long, with a maximum height of 46 feet 
above river bed. The total estimated (1970) initial 
project cost for new work, $94,900,000, includes non- 
Federal reimbursements of $39,600,000 for costs 
allocated to power, water supply and recreation and 
excludes an estimated (1970) $14,300,000 for the cost of 
future additions to recreational facilities. (See Table 5- 
B for authorizing legislation.) 
Local cooperation. Prior to construction, local interests 
are required to furnish assurances that they will; 
a. Establish encroachment lines downstream of the 
dams. 
b. Hold and save the United States free from the 
damages due to water rights claims resulting from 
construction and operation of the project. 
c. Exercise control against removal of streamflow 
made available for water quality control including 
salinity control. 
d. Contribute to the control of pollution of the 
Rappahannock River by treatment of wastes at their 
source. 
e. Repay all costs allocated to municipal and 
industrial water supply. 
f. Administer project land and water areas for 
recreation and fish and wildlife enhancement. 
g. Pay, contribute in kind, or repay (which may be 
through user fees) with interest, one- half of the 
separable construction cost, project allocated to 
recreation and fish and wildlife enhancement. 
h. Bear all costs of operation, maintenance and 
replacement of recreation and fish and wildlife lands 
and facilities. 
Operations and results during fiscal year. Preconstruction 
planning of the project was initiated. Coordination of 
planning was undertaken with other Federal and local 
agencies to minimize the adverse effects of the project 
on the existing natural resources of the area. 
Condition at end of fiscalyear. The project is in the early 
preconstruction planning phase. 
GENERAL INVESTIGATIONS 
27. SURVEYS 
Total cost for surveys during fiscal year was $218, 
615, of which $72,429 was for navigation studies, $141, 
143 for flood control studies, $4,031 for beach erosion 
studies, and $1,012 for review of watershed studies from 
other agencies. 
28. COLLECTION AND STUDY OF BASIC 
DATA 
Fiscal year cost of Flood Plain Management Services 
was $144,377. During the fiscal year, the James River 
at b Buchanan; Jackson River at b Covington; Upham 
Brook in Henrico County; and b City of Virginia 
Beach reports were completed. Work was in progress 
on eight other reports. 
29. RESEARCH AND DEVELOPMENT 
Fiscal year cost was $3,279 for hydrologic studies. 
214

NORFOLK, VA., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67- FY 68 FY 69 FY 70 June 30, 1970 
1. Atlantic Intracoastal New Work 
Waterway, between Approp. 
Norfolk, Va. and the Cost 
St. Johns River, Maint. 
Fla. (Norfolk Approp. 
District) Cost 
(Regular Funds) 
Major rehab. 
Approp. 
Cost 
Recreation 
Approp. 
Cost 
2. Aquatic Plant New Work 
Control, Va. Approp. 
(Regular Funds) Cost 
3. Baltimore Harbor New Work 
Channels (Norfolk Approp. 
District) Cost 
(Regular Funds) Maint. 
Approp. 
Cost 
4. Hampton Roads and Maint. 
the Harbors of Approp. 
Norfolk and Newport Cost 
News, Va.-Collection 
and Removal of Drift 
(Regular Funds) 
5. Hampton Roads, Va. New Work 
(Regular Funds) Approp. 
Cost 
Maint. 
Approp. 
Cost 
(Contributed Funds) New Work 
Approp. 
Cost 
6. Jackson Creek, Va. New Work 
(Regular Funds) Approp. 
Cost 
Maint. 
Approp. 
Cost 
7. James River, Va. New Work 
(Regular Funds) Approp. 
Cost 
Maint. 
Approp. 
Cost 
(Contributed Funds) Maint. 
Approp. 
Cost 
8. Lynnhaven Inlet, Va. New Work 
(Regular Funds) Approp 
Cost 
Maint. 
Approp. 
Cost 
(Contributed Funds) New Work 
Approp. 
Cost 
705,000 
703,398 
$ - $ - $ - 
648,294 1,283,874 998,083 
740,789 816,109 1,343,585 
5,000 
- 3,359 
-237,000 
304,375 
7,000 
7,837 
11,000 
8,000 
4,345 
-4,340 
1,045 
82 270,252 936,456 
82 270,252 936,456 
50,000 
40,512 
46,411 
58,531 
75,000 
61,412 
537,186 
537,186 
60,000 
61,863 
5,800,000 5,680,899 3,003,320 1,964,000 
5,515,447 6,312,430 1,883,330 3,296,847 
980,732 1,236,950 1,718,287 2,271,500 
979,829 1,168,954 1,524,569 2,462,541 
101 2,309 
101 2,309 
225,000 
317,282 
2,296 
4,654 
-50,275 
18,042 
18,042 
177 16,000 
177 4,232 
484,140 357,348 
267,252 550,570 
11,000 
164,780 
164,516 
-2,238 
8,762 
6,974 
6,895 
507,000 
219,508 
2,000 
133,000 
15,217 
$ 3,688,3721 
3,688,372 
19,377,1562 
19,253,0772 
479,947 
479,947 
11,000 
20,000 
15,541 
8,015,0703 
8,015,070 
3,408,2263 
3,408,226 
743,799 
732,074 
46,930,8344 
46,926,891 
25,430,7065 
25,320,547 
23,936 
23,936 
8,500 
8,500 
22,881 
11,113 
7,559,2406 
7,559,2406 
11,166,575 
10,844,687 
62,183 
60,183 
334,725 
334,725 
325,731 
207,605 
91,647 
91,647 
215 
TABLE 5-A

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 5-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
9. Rappahannock River, 
Va. (Regular Funds) 
10. Starlings Creek, Va. 
(Regular Funds) 
(Contributed Funds) 
11. Supervisor of Harbor 
of Hampton Roads, 
Va. (Regular Funds) 
12. Tangier Channel, Va. 
(Regular Funds) 
13. Totuskey Creek, Va. 
(Regular Funds) 
(Contributed Funds) 
14. Tylers Beach, Va. 
(Regular Funds) 
15. Waterway on the 
Coast of Virginia 
(Regular Funds) 
16. Wishart Point 
Channel, Va. 
(Regular Funds) 
20. Virginia Beach, Va. 
(Regular Funds) 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
$ - 
-10,000 
6,319 
-2,936 
32,649 
-3,468 
2,183 
20,000 
19,320 
382 3,471 
382 3,471 
170,000 163,310 
166,201 167,874 
-46,285 
2,771 
2,771 
-4,304 
5,696 
3,728 
254,000 
107,320 
85,000 
83,455 
217 
217 
180,000 
177,675 
433 91,000 
433 7,393 
1,820 
1,820 
60,400 
1,289 
68,616 
215,296 
85,000 
91,518 
121,000 
10,432 
-3,756 
55,625 
804 
804 
169,152 
109,430 
80,000 
73,415 
101 - 
101 - 
216 
$ 11,100 
135,000 
72,863 
74,000 
45,432 
$ 11,100 
414,6337 
414,633 
1,671,9298 
1,609,112 
168,091 
168,091 
66,242 
66,242 
215,163 
186,595 
2,973 
2,973 
182,393 
184,732 
-9,438 
74,169 
2,788 
113,356 
1,500 
7229 
195,218 
225,103 
2,557 
2,557 
85,000 
18,976 
114 
114 
1,771,403 
1,771,403 
116,550 
116,550 
278,886 
278,886 
167,869 
167,869 
383,611 
383,611 
2,000 
2,000 
63,268 
63,268 
2,304 
1,526 
850,498 
850,498 
1,734,883 
1,705,046 
2,557 
2,557 
764,600 
691,797 
20,171 
20,171

TABLE 5-A (Continued) 
NORFOLK, VA., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
22. Gathright Lake, Va. New Work 
(Regular Funds) Approp. $ 1,000,000 $1,290,000 $ 2,085,000 $ -254,000 $ 4,921,000 
Cost 260,900 1,938,077 753,273 1,004,409 4,746,876 
23. Newmarket Creek, Va. New Work 
(Regular Funds) Approp. 853,502 - - - 1,000,000 
Cost 32,471 141,973 540,434 200,518 1,000,000 
(Contributed Funds) New Work 
Approp. 478,000 81,520 38,700 -48,1231 550,097 
Cost - 459,526 90,571 - 550,097 
24. Norfolk, Va. New Work 
(Regular Funds) Approp. 400,000 150,000 485,000 -72,000 1,804,000 
Cost 445,085 242,795 20,663 245,511 1,614,941 
(Contributed Funds) New Work 
Approp. 175,800 - - 25,000 276,000 
Cost 142,768 33,032 - - 251,000 
26. Salem Church Lake, New Work 
Va. (Regular Funds) Approp. - - - 150,000 294,78511 
Cost - - - 65,259 210,044" 
1. Includes $292,096 for previous projects. 
2. Includes $52,804 for previous projects 
3. Costs prior to fiscal year 1942 are included in the project 
"Baltimore Harbor and Channels, Md." (Baltimore District). 
Costs listed are for York Spit Channel, Va., Rappahannock Shoal 
Channel, Va., and Cape Henry Channel, Va. 
4. Includes $3,120,313 for previous projects. 
5. Includes $84,539 for previous projects. 
6. Includes $763,000 for previous projects. 
7. Includes $197,146 for previous projects. 
8. Includes $113,500 for previous projects. 
9. In addition $3,425 was expended for condition surveys. 
10. Refunded to local interests. 
11. Includes $144,785 for previous projects. 
217

REPORT OF THE CHIEF OF ENGINEERS. U.S. ARMY 1970 
TABLE 5-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
ATLANTIC INTRACOASTAL WATERWAY BETWEEN NORFOLK, VA. 
AND ST. JOHNS RIVER, FLA. (NORFOLK DISTRICT) 
(See Section 1 of Text) 
Existing project dimensions and original route, waterway H. Doc. 317, 54th Cong., 1st sess. 
from Norfolk, Va., to sounds of North Carolina. and Annual Report, 1896, 
H. Doc. 131, 55th Cong., 3d 
sess., and Annual Report, 
1899, p. 1485. 
Original route of Norfolk-Beaufort Inlet section. H. Doc. 391, 62d Cong., 2d sess. 
Purchase of Albemarle & Chesapeake Co. Canal. H. Doc. 589, 62d Cong., 2d sess. 
Purchase of Lake Drummond Canal (Dismal Swamp Canal). Rivers & Harbors Committee Doc. 
5, 67th Cong., 2d sess. 
Construct a tidal lock at Great Bridge at a cost not to exceed S. Doc. 23, 71st Cong., 1st sess. 1 
$500,000. 
Operating and care of works of improvement provided for with 
funds from War Department appropriations for rivers and 
harbors. 
Construct dikes for protection of canal property against H. Doc. 117, 76th Cong., 1st sess. 
floodtides. 3 
BALTIMORE HARBOR AND CHANNELS (NORFOLK DISTRICT) 
(See Section 3 of Text) 
CAPE HENRY CHANNEL, VA. (See Section 3A of Text) 
Existing project. 
RAPPAHANNOCK CHANNEL, VA. (See Section 3B of Text) 
Existing project. 
YORK SPIT CHANNEL, VA. (See Section 3C of Text) 
A channel 35 feet deep and 600 feet wide. 
Channel width increased to 1,000 feet. 
Channel depth increased to 37 feet. 
Channel depth increased to 39 feet. 
Channel depth increased to 42 feet. 
HAMPTON ROADS, VA. (See Section 5 of Text) 
CHANNEL TO NEWPORT NEWS, VA. (See Section 5A of Text) 
Channel 35 feet deep and 400 feet wide. 
Channel 35 feet deep and 600 feet wide. 
Channel 40 feet deep and 600 feet wide. 
Existing project dimensions. 
NORFOLK HARBOR, VA. (See Section 5B of Text) 
Hampton Roads and Elizabeth River 
A channel 30 feet deep to navy yard. 
Depth of 35 feet to navy yard. 
Depth of 40 feet and width of 750 feet to mouth of Southern 
Branch 
Widen 40-foot channel to 1,500 feet from 40-foot contour in 
Hampton Roads to a point just south of Norfolk International 
Terminal 
45 feet deep, Ft. Wool to Lambert Point, 800 feet wide Norfolk 
International Terminal to Lambert Point 
Southern Branch 
For a channel with a depth of 22 and 25 feet. 
H. Doc. 86, 85th Cong., 1st Sess. 
H. Doc. 86, 85th Cong., 1st Sess. 
H. Doc. 186, 57th Cong., 2d sess. 
H. Doc. 1190, 62d Cong., 3d sess. 
H. Doc. 29, 71st Cong., 1st sess. 
H. Doc. 741, 79th Cong., 2d sess. 
H. Doc. 86, 85th Cong., 1st sess. 
H. Doc. 550, 61st Cong., 2d sess. 
H. Doc. 605, 63d Cong., 2d Sess. 
H. Doc. 486, 67th Cong., 4th sess. 
H. Docs. 143 & 187, 89th Cong., 
1st sess. 
H. Doc. 381, 59th Cong., 1st sess. 
H. Doc. 551, 61st Cong., 2d sess. 
H. Doc. 140, 65th Cong., 1st sess. 
S. Doc. 122, 83d Cong., 2d sess. 1 
H. Doc. 187, 89th Cong., 1st sess. 
H. Doc. 551, 61st Cong., 2d Sess. 
218 
Mar. 3, 1899 
July 25, 1912 
July 25, 1912 
Mar. 2, 1925 
July 3, 1930 
June 26, 19342 
Mar. 2, 1945 
July 3, 1958 
July 3, 1958 
Mar. 3, 1905 
Mar. 4, 1913 
July 3, 1930 
Mar 2, 1945 
July 3, 1958 
June 25, 1910 
Aug 8, 1917 
Jan 21, 1927 
Oct. 27, 1965 
Mar. 2, 1907 
June 25, 1910 
Aug..8, 1917 
Sept. 3, 1954 
Oct. 27, 1965 
June 25, 1910

TABLE 5-B (Continued) 
NORFOLK, VA., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 8, 1917 
Mar. 3, 1925 
Aug. 30, 1935 
June 30, 1948 
Oct. 27, 1965 
July 5, 1884 
Mar. 2, 1907 
Mar. 2, 1907 
Mar. 3, 1925 
July 3, 1930 
Mar. 2, 1945 
Mar. 4, 1913 
July 3, 1930 
July 3, 1930 
June 25, 1910 
Aug. 8, 1917 
Sept. 3, 1954 
Oct. 27, 1965 
July 24, 1946 
Aug. 8, 1917 
Sept. 3, 1954 
Oct. 27, 1965 
Aug. 30, 1935 
July 5, 1884 
June 13, 1902 
Depth of 40 feet and width of 450 feet from mouth to 
Belt Line R. R. bridge. 
Channel 30 feet deep and 375 feet wide to Virginia Ry. bridge 
thence 25 feet deep and generally 200 feet wide to Norfolk & 
Western Ry. bridge. 
Depth of 25 feet and width of 200 feet from Norfolk & Western 
Ry. bridge to a point 2,500 feet above with a turning basin 
500 feet square. 
Approach and turning area 40 ft. deep and a maximum width of 
830 feet opposite Norfolk Naval Shipyard thence a channel 
35 feet deep and 375 and 250 feet wide to a point 1,900 feet 
above Norfolk & Western Ry. bridge and a turning basin 35 
feet deep and 600 by 600 feet at upstream end. 
40 feet deep Belt Line bridge to Old Virginia bridge, 35-foot 
deep turning basin opposite St. Julians Creek. 
Eastern Branch 
Improvement of Eastern Branch 
Width of 500 feet and depths of 25 and 22 feet. 
Removal of shoals at mouth. 
Depth of 25 feet and width of 200 feet from Norfolk & Western 
Ry. bridge to Virginia Ry. bridge. 
30-foot channel to a point opposite terminal of Imperial 
Tobacco Co. in Berkley 
Depth of 25 feet and width of 300 feet from Norfolk & Western 
Ry. bridge to Campostella bridge. 
Western Branch 
Channel 24 feet deep and 300 & 400 feet wide to West Norfolk 
highway bridge. 
For 18-foot channel to a point about 3,000 feet above West 
Norfolk highway bridge. 
Scotts Creek 
For existing project dimensions 
Anchorages 
A 30-foot anchorage at Lambert Point. 
A 12-foot anchorage at Pinner Point. 
An anchorage 38 feet deep and 1,500 feet square; anchorage 35 
feet deep and 1,500 feet square; and anchorage 20 feet 
deep, 1,000 feet wide, and 3,000 feet long. 
Two anchorages opposite Sewells Point, 45 feet deep with 
1,200-foot swinging radius. 
Disposal Area 
A trapezoidal-shaped area of about 2,500 acres of flats 
adjacent to and north of Craney Island, including levees, 
sluiceways, rehandling basins, and approach and exit areas. 
THIMBLE SHOAL CHANNEL, VA. (See Section 5C of Text) 
A channel 40 feet deep and 750 feet wide. 
Channel width increased to 1,000 feet with side channels on 
either side 32 feet deep and 450 feet wide. 
Channel 45 feet deep and 1,000 feet wide. 
JACKSON CREEK, VA. (See Section 6 of Text) 
Existing project. 
JAMES RIVER, VA. (See Section 7 of Text) 
Channel 22 feet deep from mouth to Richmond and construct 
spur and training dikes. 
Extension of improvement to Richmond lock gate. 
219 
H. Doc. 140, 65th Cong., 1st sess.1 
H. Doc. 226, 68th Cong., 1st sess. 
H. Doc. 182, 73d Cong., 2d sess. 
H. Doc. 545, 80th Cong., 2d sess.1 
H. Doc. 187, 89th Cong., 1st sess. 
Annual Report 1885, p. 1015, 
H. Doc. 373, 59th Cong., 1st sess. 
Specified in act. 
H. Doc. 226, 68th Cong., 1st sess. 
H. Doc. 37, 71st Cong., 1st sess. 5 
H. Doc. 224, 76th Cong., 1st sess. 
H. Doc. 566, 62d Cong., 2d sess. 
H. Doc. 265, 70th Cong., 1st sess. 1 
H. Doc. 189, 70th Cong., 1st sess. 
H. Doc. 551, 61st Cong., 2d sess. 
H. Doc. 605, 63d Cong., 2d sess. 1 
S. Doc. 122, 83d Cong., 2d sess. l 
H. Docs. 187 & 143, 89th Cong., 
1st sess. 
H. Doc. 563, 79th Cong., 2d sess. 1 
H. Doc. 140, 65th Cong., 1st sess. 
S. Doc. 122, 83d Cong., 2d sess. l 
H. Doc. 187, 89th Cong., 1st sess. 
H. Doc. 41, 73d Cong., 2d sess. 
S. Ex. Doc. 147, 47th Cong., 
1st sess. 
H. Doc. 234, 56th Cong., 1st sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 5-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized 
Mar. 3, 1905 
July 3, 1930 
Aug. 26, 1937 
Mar. 2, 1945 
May 17, 1950 
Oct. 23, 1962 
Oct. 23, 1962 
Mar. 3, 1905 
Form a turning basin by widening channel at Richmond. 
Channel 25 feet deep mouth to Richmond Deepwater Terminal 
Removal of Trigg cofferdam. 
Turning basin in Richmond Harbor. 
Maintain turning basin at Richmond Deepwater Terminal. 
Existing project dimensions. 
LYNNHAVEN INLET, VA. (See Section 8 of Text) 
Existing project. 
RAPPAHANNOCK RIVER, VA. (See Section 9 of Text) 
Existing project. 
STARLINGS CREEK, VA. (See Section 10 of Text) 
Aug. 30, 1935 Entrance channel and turning basin. 
July 14, 1960 (Sec. 107) Harbor of refuge. 
TANGIER CHANNEL, VA. (See Section 12 of Text) 
Mar. 2, 1919 Channel from Tangier Sound and anchorage. 
Jan. 3, 1934 (P.W.A. Act) and 
Aug. 30, 1935 Changed channel and anchorage dimensions. 
Mar. 2, 1945 Modified project dimensions. 
July 14, 1960 (Sec. 107) Channel across Tangier Island. 
TOTUSKEY CREEK, VA. (See Section 13 of Text) 
June 14, 1880 Dike construction at Booker Bar. 
Aug. 30, 1935 Channel 8 feet deep and 150 feet wide at mouth, 80 feet wide 
upstream and repair of dike at Booker Bar. 
Mar. 2, 1945 Channel 10 feet deep and 150 feet wide at mouth and 100 feet 
wide upstream. 
TYLERS BEACH, VA. (See Section 14 of Text) 
July 14, 1960 (Sec. 107) Existing project. 
June 25, 1910 
Mar. 2, 1945 
July 14, 1960 (Sec. 107) 
Sep. 3, 1954 
Oct. 23, 1962 
July 24, 1946 
June 30, 1948 (Sec. 205) 
Oct. 23, 1962 
WATERWAY ON THE COAST OF VIRGINIA (See Section 15 of Text) 
Existing project adopted. 
Project modified. 
WISHART POINT CHANNEL, VA. (See Section 16 of Text) 
Existing project. 
VIRGINIA BEACH, VA. (See Section 20 of Text) 
Existing project authorized. 
Project modified 
GATHRIGHT LAKE, VA. (See Section 22 of Text) 
Existing project. 
NEWMARKET CREEK, VA. (See Section 23 of Text) 
Existing project. 
NORFOLK, VA. (See Section 24 of Text) 
Existing project. 
Approved in 1969. 
H. Doc. 186, 83d Cong., 1st sess. 
H. Doc. 382, 87th Cong., 2d sess. 
H. Doc. 207, 80th Cong., 1st sess. 
Approved in 1965. 
H. Doc. 354, 87th Cong., 2d sess. 
220 
__ 
Documents 
H. Doc. 234, 56th Cong., 1st sess. 
H. Doc. 314, 71st Cong., 2d sess. 
Rivers and Harbors Committee 
Doc. 68, 74th Cong., 1st sess. l 
H. Doc. 738, 77th Cong., 2d sess.1 
H. Doc. 191, 81st Cong., 1st sess. 
H. Doc. 586, 87th Cong., 2d sess.1 
H. Doc. 580, 87th Cong., 2d sess. 
Annual Report for 1906, pp. 
1110-11136 
Rivers and Harbor Committee 
Doc. 46, 74th Cong., Ist sess. 
Approved in 1963. 
H. Doc. 107, 63d Cong., 1st sess. 
Rivers and Harbor Committee 
Doc. 51, 72d Cong., 2d sess. 
H. Doc. 141, 77th Cong., 1st sess. 
Approved in 1964. 
Annual Report for 1880, vol. 1, 
p. 768. 
H. Doc. 183, 72d Cong., 1st sess. 
H. Doc. 686, 76th Cong., 3d sess.i 
Approved in 1966. 
H. Doc. 957, 60th Cong., I1st sess. 
H. Doc. 268, 76th Cong., 1st sess.

TABLE 5-B (Continued) 
NORFOLK, VA., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
SALEM CHURCH LAKE, VA. (See Section 26 of Text) 
July 24, 1946 Existing project. S. Doc. 37, 90th Cong., 1st Sess. 
1. Contains latest published map. 5. For latest published map, see H. Doc. 1246, 62d Cong., 
2. Permanent Appropriations Repeal Act. 3d sess. 
3. Inactive. 6. For latest published map, see Annual Report for 1906, 
4. Included in emergency relief administration program May page 1364. 
28, 1935. 
ATLANTIC INTRACOASTAL WATERWAY BETWEEN 
NORFOLK, VA., AND ST. JOHNS RIVER, FLORIDA: 
TABLE 5-C. DATA RELATIVE TO THE COMPLETED LOCKS 
(See Section 1 of Text) 
Dimensions 
Great- Depth on 
est Miter Sills Miles Width Lenth Year 
from of Length 
NorLocation Cham- Avail- Lift Upper Lower Character of Opened Actual 
able (feet) (feet) (feet) Foundation to Cost 
, er for Full Navi- 
Va. (feet) Width gation 
(feet) 
12.4 Albermarle and Chesa- 75 600 2.7 1 1 Piles in sand 1932 $499,913 
peake Canal (Great and shells 
Bridge, Va.) 
10.7 Dismal Swamp Canal 52 300 12 12 12 Natural earth 1940 348,879 
(Deep Creek) with cutoff 
walls 
33.1 Dismal Swamp Canal 52 300 12 12 13 Natural earth 1941 372,556 
(South Mills, N. C.) with cutoff 
walls 
116 feet at mean low water. 
451-584 0-72-15 221

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 5-D RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 17 in Text) 
Date Reconnaissance Date Reconnaissance 
Project or Condition Survey Project or Condition Survey 
Conducted1 Conducted 
Virginia Virginia (continued) 
Aberdeen Creek May 702 Locklies Creek Sep 692 
Appomattox River Apr 702 Mattaponi River Apr 702 
Blackwater River - Mill Creek 
Broad Creek Feb 702 Milford Haven 
Cape Charles City Harbor Oct 69 and Apr 703 Nandua Creek Jun 702 
Channel connecting York River Apr 702 Nansemond River Apr 702 
with Back Creek to Slaights Wharf Newport News Creek 
Newport News Creek 
Channel from Phoebus Mar 70 Occohannock Creek June 702 
Chincoteague Bay Apr 702 Onancock River Mar - Apr 703 
Chincoteague Harbor of Refuge May 702 Oyster Channel Jul - Oct 693 
Davis Creek Apr 703 Pagan River 
Deep Creek, Accomack County - Parker Creek Apr 703 
Deep Creek, Newport News Mar 702 Parrotts Creek Apr 702 
Greenvale Creek Apr 702 Queens Creek Aug 692 
Hampton Creek Aug 692 Quinby Creek Aug 692 
Horn Harbor Feb 702 Tylers Beach Apr 703 
Hoskins Creek Nov 692 Urbanna Creek Apr 703 
Lafayette River Mar 702 Whitings Creek Jun 703 
Little Machipongo River - Winter Harbor Jun 702 
Little River (Creek) Mar 703 York River Sep - Oct 692 
2Items for which no date is furnished reflect costs for gathering data only. 
2 Reconnaissance. 
Condition. 
222

NORFOLK, VA., DISTRICT 
OTHER AUTHORIZED NAVIGATION PROJECTS 
Project 
Aberdeen Creek, Va. 1 
Appomattox River, Va. 
Active portion 2 
Inactive portion 
Blackwater River, V . 
Active portion 
Inactive portion 
Broad Creek, Va.1 
Cape Charles City Harbor, Va. 
Active portion 4 
Carters Creek, Va. 
Active portion1, 5 
Channel from Phoebus, Va. to deepwater in 
Hampton Roads 1 
Channel connecting York River, Va. with 
Back Creek to Slaights Wharf 1 
Chesconnessex Creek, Va.1 
Chincoteague Bay, Va.1 
Chincoteague, Va. - Harbor of Refuge 
Chowan River6 
Cockrells Creek, Va.7 
Cranes Creek, Va.1 
Davis Creek, Va.1 
Deep Creek, Accomack County, Va. l 
Deep Creek, Newport News, Va. ' 8 
Dymers Creek, Va.1 
Greenvale Creek, Va. 1 
Hampton Creek, Va. 1' 9 
Horn Harbor, Va.1 
Hoskins Creek, Va.1 
Kings Creek, Va.7 
Lafayette River, Va.l 
Little Machipongo River, Va. 
Little River (Creek), Va.1 ' 10 
Locklies Creek, Va.1 
Mattaponi River, Va. 
Active portion 11 
Meherrin River, N. C. 1 
Milford Haven, Va.1 
Mill Creek, Va. 
Mulberry Creek, Va.1 
Nandua Creek, Va.1 
Nansemond River, Va.1' 12 
Newport News Creek, Va.1 
Occohannock Creek, Va. 
Active portion 
Onancock River, Va.1' 13 
For Last 
Full Report, 
See Annual 
Report for 
1963 
1969 
1969 
1962 
1968 
1951 
1944 
1950 
1968 
1968 
1962 
1950 
1949 
1950 
1962 
1958 
1962 
1953 
1969 
1967 
1964 
1969 
1957 
1969 
1950 
1966 
1928 
1961 
1950 
1950 
1937 
1950 
1950 
1968 
1962 
1951 
1963 
Cost to June 30, 1970 
Construction Maintenance 
$109,643 $ 11,062 
852,651 
17,690 
16,144 
19,900 
27,888 
705,685 
28,398 
11,500 
14,855 
25,516 
25,126 
49,396 
6,274 
97,612 
83,000 
202,622 
5,582 
20,003 
186,237 
13,987 
44,100 
5,593 
79,866 
15,000 
168,623 
11,581 
83,836 
47,734 
24,568 
5,445 
2,393 
6,988 
167,477 
135,600 
13,859 
187,914 
574,391 
138,450 
29,375 
290,748 
3,277 
20,809 
35,902 
362 
70,249 
1,702 
714 
76,614 
7,575 
217,073 
4,524 
16,117 
477,126 
212,934 
335,112 
14,068 
27,309 
348,230 
1,804 
173,167 
49,591 
14,837 
1,629 
2,458 
10,398 
242,050 
87,969 
38,927 
264,050 
Additional Expenditure 
for New Work Expended 
from Contributed Funds 
$11,300 
6,000 
1,200 
2,500 
2,140 
4,000 
2,910 
62,969 
500 
63,962 
16,995 
223 
TABLE 5-E

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 5-E (Continued) OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Additional Expenditure 
Project Full Report, Cost to June 30, 1970 for New Work Expended 
See Annual from Contributed Funds 
Report for Construction Maintenance 
Oyster Channel, Va.1 1969 $119,717 $ 96,745 $ - 
Pagan River, Va.1' 14 1950 51,425 264,934 
Pamunkey River, Va. 1964 
Active portion 31,376 161,183 
Parker Creek, Va.1 1964 15,530 1,730 1,350 
Parrotts Creek, Va.1 1957 37,045 8,020 
Portsmouth Harbor, Va., Channel to Nansemond 
Ordnance Depot1 1947 165,566 66,162 
Queens Creek, Va.
1 
1968 26,949 954 10,383 
Quinby Creek, Va.1 1969 104,176 114,261 
Rappahannock River at Bowlers Wharf, Va.7 1950 - - 
Urbanna Creek, Va.1' 1 5 is 1963 55,724 56,567 
Whitings Creek, Va.1 1962 21,630 17,649 500 
Willoughby Channel, Va.1 1953 8,500 20,624 
Winter Harbor, Va.1 1966 171,334 43,258 5,000 
York River, Va. 1958 
Active portion1 180,904 200,438 
2Completed. 
Includes $22,500 for new work for previous projects. 
4Includes $14,000 for new work for previous projects. 
Includes $445,291 military funds expended for new work dredging 
on existing project and $83,041 military funds expended for new work 
onconstruction of wharf and bulkhead. 
In addition, $700 for maintenance was expended from contributed 
fu gs. 
The 12-foot channel portion of the project is inactive. 
gInactive. 
8In addition, $36,000 for maintenance was expended from 
contributed funds. 
9Includes $12,000 for new work for previous projects. In 
addition, $73,800 for maintenance was expended from contributed 
funds. 
10 Federal funds expended by the U. S. Navy for new work. 
1 1Includes $51,249 for new work and $60,440 for maintenance 
for previous projects. 
1 2Includes $30,000 for new work and $7,000 for maintenance 
for previous projects. 
13Includes $33,549 for new work and $24,754 for maintenance 
for previous projects. 
14Includes $20,671 for new work for previous projects. 
1 5 In addition, $61,087 was expended for rehabilitation. 
224

WILMINGTON, N.C., DISTRICT * 
This district comprises central and eastern North 
Carolina and a portion of south-central Virginia, 
embraced in drainage basins tributary to the Atlantic 
Ocean from the southern boundary of Virginia to the 
Shallotte River, inclusive, with exception of the 
Meherrin River Basin above Murfreesboro, N. C., the 
Chowan River Basin above the confluence of the 
Nottaway and Blackwater Rivers, and the Pasquotank 
River and its tributaries for navigation only. It includes 
a portion of the Atlantic Intracoastal Waterway from 
the northern boundary of North Carolina to Little 
River, S. C., and a portion of the waterway from 
Norfolk, Va., to the Sounds of North Carolina, south of 
the north shore of Albemarle Sound. 
IMPROVEMENTS 
Navigation Page 
1. Aquatic Plant Control (R & H Act of 
1965) ........................................... 226 
2. Atlantic Intracoastal Waterway Between 
Norfolk, Va. And St. Johns River, 
Fla. (Wilmington District) .................... 226 
3. Avon Harbor, N. C. ..................... . 227 
4. Beaufort Harbor, N. C. ....................... 227 
5. Cape Fear River, N. C., Above 
Wilmington ........................................ 228 
6. Channel from Back Sound to Lookout 
Bight, N.C. .................... ................. 228 
7. Drum Inlet, N.C. .................................... 228 
8. Lockwoods Folly River, N. C. .......... 229 
9. Manteo (Shallowbag) Bay, N. C. ........ 229 
10. Morehead City Harbor, N. C .. ......... 229 
11. Neuse River, N. C. ................................ 230 
12. Ocracoke Inlet, N. C. ........................... 230 
13. Rollinson Channel, N. C. ..................... 230 
14. Silver Lake Harbor, N. C ................... 231 
15. Waterway Connecting Pamlico Sound 
and Beaufort Harbor, N. C .......... 231 
16. Wilmington Harbor, N. C ................... 232 
17. Reconnaissance and Condition Surveys . 232 
18. Other Authorized Navigation Projects ... 232 
19. Navigation Work Under Special 
Authorization ........................................ 232 
Beach Erosion Control 
20. Fort Macon State Park, N. C ........... 232 
21. Other Authorized Beach Erosion 
Control Projects ..................................... 233 
Flood Control 
22. Black River, Harnett County, N. C. ...... 233 
23. Broad Creek, Beaufort County, N.C...... 233 
24. Brunswick County Beaches, N. C. (Cape 
Fear to North Carolina-South 
Carolina State Line) .......................... 234 
25. Cape Fear River Basin, N. C. .............. 234 
Flood Control (cont.) Page 
25A. New Hope Lake, N. C. ............................ 235 
25B. Randleman Lake, N. C. ........................ 235 
26. Carolina Beach and Vicinity, N. C ...... 236 
27. Conoho Creek, N. C. ............................. 236 
28. Ellis Swamp, Gates County, N. C. ...... 236 
29. Filberts Creek, N. C ............................... 237 
30. Gardners Creek, N. C. ....................... 237 
31. Hominy Swamp, N. C. .......................... 237 
32. Joyce Creek, Camden County, N. C. ..... 238 
33. Lick Run, Roanoke, Va .......................... 238 
34. Mackay Creek, N. C. .......................... 238 
35. Mill Creek, N. C. ................................... 239 
36. Moccasin Swamp, N. C ........................ 239 
37. Moyock Creek, N. C ................................ 239 
38. Neuse River Basin, N. C. ........................ 240 
38A. Falls Lake, N. C. ....................................... 240 
39. New River, Onslow County, N. C. ....... 241 
40. Ocracoke Island, N. C. .......................... 241 
41. Pungo Creek, N. C ............................. 241 
42. Rockfish Creek, N. C ............................ 242 
43. Six Runs Creek, Sampson County, N. 
C ............................................................. 242 
44. South Creek, N. C .............................. 242 
45. Sweetwater Creek, N. C .......................... 243 
46. Thoroughfare Swamp, N. C ................ 243 
47. Tranters Creek, N. C. ............................... 243 
48. Wrightsville Beach, N. C. ..................... 244 
49. Inspection of Completed Flood Control 
Projects. ........................................ 244 
50. Other Authorized Flood Control Projects 244 
51. Flood Control Work Under Special 
Authorization ..................................... 244 
Multiple-Purpose Projects Including Power 
52. Roanoke River Basin, Va. and N. C. .... 244 
52A. John H. Kerr Dam and Reservoir, Va. 
and N. C. ........................................ 245 
52B. Philpott Lake, Va ................................... 245 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
225

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Multiple-Purpose Projects Including Power (cont.) Page 
53. Scheduling Flood Control Reservoir 
Operations ..................................... 245 
General Investigations Page 
54. Surveys ....................................... 245 
55. Collection and Study of Basic Data ....... 246 
NAVIGATION 
1. AQUATIC PLANT CONTROL (RIVER 
AND HARBOR ACT OF 1965) 
Location. Navigable waters, tributary streams, connecting 
channels, and other allied waters in Wilmington 
District. 
Existing project. The existing project provides for 
control and progressive eradication of water-hyacinth, 
alligatorweed, Eurasian watermilfoil, and other 
obnoxious aquatic plant growths from navigable 
waters, tributary streams, connecting channels, and 
other allied waters of the United States, in the 
combined interest of navigation, flood control, drainage, 
agriculture, fish and wildlife conservation, public 
health, and related purposes, including continued 
research for development of the most effective and 
economic control measures in cooperation with other 
Federal and State agencies in accordance with the 
report of the Chief of Engineers, House Document 251, 
89th Congress, 1st session. The project was authorized 
by Section 302, 1965 River and Harbor Act (H. D. 251, 
89th Cong., 1st sess.) The Act provides that research 
and planning costs shall be borne fully by the United 
States. 
Local cooperation. Local interests must agree to hold 
the United States free from damages that may occur 
from operations performed in connection with this 
project, and participate to the extent of 30 percent of 
the cost of the program. Requirements are being met. 
Operations and results during fiscal year. Trial field 
applications of granular 2,4-D were applied on a total 
of 200 acres of Eurasian watermilfoil in Currituck 
Sound in June 1968 (FY 68). The studies on the effects 
on water quality and marine life by the U. S. Fish and 
Wildlife Service have shown no adverse effects. 
Observations of the overall watermilfoil problem are 
continuing. Treatment of limited high priority high use 
areas and of certain area to prevent further southward 
spread of the weed may be recommended. 
Condition at end of fiscal year. The state General Design 
Memorandum was submitted to higher authority and 
approved. The supplemental agreement to contract 
with the State of North Carolina was finalized and has 
been approved and accepted by the State. 
2. ATLANTIC INTRACOASTAL 
WATERWAY BETWEEN NORFOLK, VA 
AND ST JOHNS RIVER, FLA. 
(WILMINGTON DISTRICT) 
Location. The project is located on the east coast of the 
United States, between Norfolk, Va., and St. Johns 
River, Florida. The section within Wilmington District 
begins at the Virginia-North Carolina State line and 
extends generally southerly and southwestwardly to 
Little River, S. C. a total of 308 statute miles. (See 
Coast and Geodetic Survey Charts 830 to 842, 
inclusive.) 
Previous projects. For details see Annual Reports for 
1915, 1926, 1932, and 1938. 
Existing project. The authorized project provides for a 
waterway, 12 feet deep, with widths varying from 90 
feet in land cuts to 300 feet in open waters; the 
construction, operation and maintenance of suitable 
bridges; salt-water-intrusion preventive measures in 
the vicinity of Fairfield, N. C.; a channel in Peltier 
Creek, 6 feet deep and 50 feet wide from the 
Intracoastal Waterway in Bogue Sound to and 
including a basin in Peltier Creek, 6 feet deep, 200 feet 
wide, and 600 feet long; a channel, 6 feet deep and 90 
feet wide between the Intracoastal Waterway and the 
gorge in Bogue Inlet; a channel, 12 feet deep and 90 
feet wide to a turning basin, 200 feet wide and 350 feet 
long, at Swansboro; a channel, 6 feet deep and 90 feet 
wide in New River Inlet, and a connecting channel of 
the same dimensions to the Intracoastal Waterway 
near the mouth of New River; a channel, 10 feet deep 
90 feet wide in New River, between the Intracoastal 
Waterway and the Seaboard Coast Line Railroad 
bridge at Jacksonville, N. C.; a channel through New 
Topsail Inlet, 8 feet deep and 150 feet wide and a 
channel from New Topsail Inlet to the Intracoastal 
Waterway by way of Old Topsail Creek, 7 feet deep 
and 80 feet wide; a channel, 7 feet deep and 80 feet 
wide, in Banks Channel, from New Topsail Inlet, 
paralleling the barrier beach, to the Atlantic Intracoastal 
Waterway; a channel, 14 feet deep and 400 
feet wide, across the ocean bar at Masonboro Inlet, 
with suitable jetties at the entrance, thence 12 feet deep 
and 90 feet wide to the channel of the Intracoastal 
Waterway at Wrightsville by way of Banks and Motte 
Channels; a turning basin, 15 feet deep, 300 feet wide, 
and 700 feet long, on the east side of Banks Channel 
near Masonboro Inlet, with three 15-pile dolphins 
therein; a channel, 6 feet deep, 80 feet wide, and 8,000 
feet long, to and including a turning basin of the same 
depth, 130 feet wide and 180 feet long, at Carolina 
Beach; a yacht basin, 230 feet wide, 450 feet long, and 
12 feet deep, at the town of Southport, connected to the 
waterway by a suitable channel of the same depth; and 
maintenance of the general navigation features of the 
North Carolina State Ports Authority Small-Boat 
Harbor at Southport, consisting of an entrance 
channel, 150 feet wide and 400 feet long, an eastern 
harbor-access channel, 70 feet wide and 430 feet long, a 
western harbor-access channel, 60 feet wide and 185 
feet long, to a turning basin, 180 feet wide and 550 feet 
long, all to a depth of 6 feet. Length of channels and 
226

WILMINGTON, N.C., DISTRICT 
basins totals 347.1 miles. Plane of reference is mean low 
water. 
In the waterway north of Neuse River, variations in 
water surface due to winds seldom exceeds 2 feet above 
or below mean stage. Between Beaufort and the Cape 
Fear River, normal tidal range varies from 3-1/2 feet at 
the inlets to 1 foot at points between. Average range of 
tide is 4 feet on the ocean side of Bogue Inlet and 2.5 
feet just inside the inlet. At New River, tidal range 
varies from 3-1/2 feet at the inlet to 1 foot at the head of 
the marshes and zero at Tar Landing, 31 miles above. 
From Cape Fear River, N. C., to Little River, S. C., 
mean tidal range varies between 4.7 feet in Cape Fear 
River and 4 feet at the intermediate inlets, and 2 feet at 
points midway between the inlets. On October 15, 1954 
(Hurricane Hazel), the tide at Holden Beach reached 
an elevation of 17.6 feet. (See Table 6-B for authorizing 
legislation.) 
Local cooperation. Fully complied with to date. 
Operations and results during fiscal year. Maintenance: 
During intermittent periods the U. S. sidecasting 
dredge Merritt removed 42,579 cubic yards from shoals 
in New River Inlet at a cost of $20,418; 20,636 cubic 
yards from shoals in Topsail Inlet at a cost of $14,899; 
and 7,477 cubic yards from shoals in the through 
waterway at a cost of $11,936. Between July 1, 1969 
and March 12, 1970 the contract dredges Neuse and 
Richmond removed 837,255 cubic yards from shoals in 
the through waterway between the Neuse River, N. C. 
and Little River, S. C., including 26,852 cubic yards 
from shoals in the Old Southport boat basin at a cost of 
$386,767. During intermittent periods the U. S. 
Snagboat Snell installed tide gages, mooring piling, 
signs and conducted snagging operations at a cost of 
$21,074. Between February 2 and June 7, 1970, 
structural and decking repairs to Core Creek, Fairfield, 
Hobucken and Wilkerson Creek drawbridges cost 
$212,569. Between March 16 and May 14, 1970, the 
contract dredge Pittsburg removed 662,972 cubic yards 
from shoals in the channel to Masonboro Inlet at a cost 
of $173,475. Engineering and design for repairs to 
bridge walkways cost $2,574. Studying the south jetty 
at Masonboro Inlet cost $5,498. Repairs to the north 
jetty at Masonboro Inlet cost $487,701. Condition and 
operation studies cost $175,426. Five highway bridges 
and utilities were operated and maintained for $279, 
639. 
Condition at end of fiscal year. The project was 
completed in April 1967, except for the south jetty and 
three tie-up dolphins at Masonboro Inlet. Total cost for 
existing project to June 30, 1970 was $27,862,157, of 
which $11,425,934 was for new work and $16,436,223 
was for maintenance. 
3. AVON HARBOR, N. C. 
Location. The project is located on the east coast of 
North Carolina, 9 miles north of Cape Hatteras. (See 
Coast and Geodetic Survey Chart 1232.) 
Existing project. The authorized project provides for a 
direct channel 6 feet deep, 100 feet wide, and 3.5 miles 
long from that depth in Pamlico Sound southeast to a 
basin of the same depth, 100 feet wide and 300 feet long 
at Avon. Plane of reference is mean low water. 
Variations in the water surface of Pamlico Sound, due 
to winds, seldom range as much as 2 feet above or below 
mean stage; however, severe windstorms will double or 
triple that variation. The original project was 
authorized by the 1945 River and Harbor Act (H. D. 
316, 76th Cong., 1st sess.) and modification for direct 
channel authorized May 5, 1965, under section 107, 
River and Harbor Act of 1960. 
Local cooperation. Fully complied with. 
Terminal facilities. There are five wharves in the basin 
at Avon, with a total frontage of about 300 feet. These 
facilities are considered adequate for present 
commerce. 
Operations and results during fiscal year. Maintenance: 
Between July 21 and July 26,1969, the contract dredge 
Clarendon removed 19,161 cubic yards from shoals in the 
entrance channel at a cost of $23,299. 
Condition at end of fiscal year. The project was 
completed July 1965. (For further details, see Annual 
Report for 1962.) 
4. BEAUFORT HARBOR, N. C. 
Location. The project is just inside Beaufort Inlet, 
adjacent to Morehead City Harbor. (See Coast and 
Geodetic Survey Chart 420.) 
Previous projects. For details see Annual Reports for 
1915 and 1938. 
Existing project. The authorized project provides for 
stopping erosion at Beaufort Inlet by jetties and sand 
fences at Fort Macon and Shackleford points and other 
shore protection; channels 15 feet deep at mean low 
water and 100 feet wide in Bulkhead and Gallants 
channels, except for a depth of 12 feet in the upper 5, 
000 feet of Gallants Channel; a harbor of refuge in 
Town Creek 12 feet deep, 400 feet wide, and 900 feet 
long connected to Gallants Channel by a channel 12 
feet deep, 150 feet wide, and 1,400 feet long; a basin 12 
feet deep, 600 feet wide in front of the town of Beaufort 
except for a channel 15 feet deep, 100 feet wide through 
the basin; a stone bulkhead from Town Marsh across 
Bird Shoal to the west end of Carrot Island; and a 
channel in Taylors Creek 15 feet deep, 100 feet wide, 
extending about 2.6 miles easterly from about opposite 
Marsh Street in Beaufort to Lennoxville Point at North 
River, except for an 800-foot-long section at the east 
end which is 12 feet deep. Total length of channels is 
6.9 miles. Average tidal range is 2.5 feet at Beaufort 
and 3.5 feet at the inlet. (See table 6-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are a total of fifty waterfront 
facilities with a total frontage of 2,000 feet. These 
facilities are adequate for present commerce. 
227

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. Maintenance: 
Between January 13 and 20, 1970, the contract dredge 
Arlington removed 33,207 cubic yards from shoals in 
Bulkhead Channel at a cost of $33,010. Condition and 
operation studies cost $255. 
Condition at end of fiscal year. The project was 
completed in October 1965. (For further details see 
Annual Report for 1962.) Costs under existing project 
to June 30, 1970, were $573,389 for new work and 
$872,006 for maintenance, a total of $1,445,395. 
5. CAPE FEAR RIVER, N. C., ABOVE 
WILMINGTON 
Location. The river is formed by confluence of the 
Deep and Haw Rivers at Moncure, Chatham County, 
N. C., and empties into the Atlantic Ocean at Cape 
Fear, near the southern extremity of the State. (See 
Coast and Geodetic Survey Chart 426.) 
Previous projects. For details see Annual Reports for 
1915 and 1938. 
Existing project. The authorized project provides for a 
channel 25 feet deep and 200 feet wide from 
Wilmington to a turning basin 400 feet wide and 550 
feet long at Navassa (2.9 miles); a channel 12 feet deep 
and 140 feet wide from Navassa to mileboard 30 at 
Acme, with five channel cutoffs, 12 feet deep and 150 
feet wide to eliminate sharp bends; a channel 8 feet 
deep from mileboard 30 to Fayetteville by constructing 
three locks and dams and by dredging river shoals; and 
recreational facilities at the locks and dams. Total 
length of the project channels is 113.9 miles. Estimated 
cost of new work is $3,993,000 (1968), exclusive of 
amounts expended on previous projects, but including 
$93,482 for rehabilitation of lock No. 1 dam. Project 
was authorized by River and Harbor Acts of June 25, 
1910; June 26, 1934; August 30, 1935; August 26, 
1937; October 27, 1965; and section 4, Flood Control 
Act of 1944. For further details see Annual Report for 
1962. 
Local cooperation. Fully complied with. 
Terminal facilities. There are ten waterfront facilities 
on the river, with a total frontage of 840 feet. 
Additional facilities will be provided with the 12-foot 
modification. 
Operations and results during fiscal year. New work: 
Between July 1, 1969 and June 26, 1970, the contract 
dredge Captain Phillips removed 1,409,449 cubic yards 
to complete the new 12-foot channel, including the cutoff 
channels above Navassa, at a Federal cost of $577, 
241. Maintenance: During intermittent periods, the U. 
S. snagboat Snell conducted snagging operations in the 
channel to Fayetteville at a cost of $15,706. Condition 
and operation studies cost $49,931. Operation and 
maintenance of the three locks and dams cost $107,906. 
Condition at end of fiscal year. The project was 
completed in June 1970. Total costs to June 30, 1970 
were $8,493,320 of which $3,529,483 (including $1, 
226,385 public works) was for new work and $4,963, 
837 for maintenance. 
6. CHANNEL FROM BACK SOUND TO 
LOOKOUT BIGHT, N. C. 
Location. The project is located on the coast of North 
Carolina, 8 miles east of Beaufort Inlet. (See Coast and 
Geodetic Survey Chart 420.) 
Existing project. The authorized project provides for a 
channel 100 feet wide and 7 feet deep from Back 
Sound, through Shackleford Banks to Lookout Bight. 
The project was authorized by River and Harbor Acts 
of August 26, 1937, and March 2, 1945. For details see 
Annual Report for 1959. 
Local cooperation. Fully complied with. 
Terminal facilities. None required. 
Operations and results during fiscal year. Maintenance: 
Between September 20 and October 9, 1969, U. S. 
sidecasting dredge Merritt removed 29,185 cubic yards 
from shoals in the Bardens Inlet channel at a cost of 
$14,772. Between January 22 and February 1, 1970, 
the contract dredge Arlington removed 34,148 cubic 
yards from shoals in the channel at a cost of $33,911. 
Condition and operation studies cost $807. 
Condition at end of fiscal year. Project completed May 
1965. 
7. DRUM INLET, N. C. 
Location. Drum Inlet is an opening through the 
barrier beach which separates Core Sound from the 
Atlantic Ocean. It is about 1,100 feet wide and is about 
35 miles northeast of Beaufort and opposite the village 
of Atlantic. (See Coast and Geodetic Survey Charts 
1233 and 419.) 
Existing project. The project provides for a channel 12 
feet deep at mean low water and 200 feet wide from the 
gorge in the inlet to the federally improved channel in 
Core Sound, about 1 mile. The mean range of tide is 
3.8 feet in the ocean and 0.3 foot in Core Sound at 
Atlantic. The project also provides for a channel 150 
feet wide and 9 feet deep from the gorge in the inlet to 
deep water in the Atlantic Ocean. The Core Sound 
portion of the project was authorized by the River and 
Harbor Act of June 20, 1938 (H. D. 414, 75th Cong., 2d 
sess.) The channel from the inlet to the Atlantic Ocean 
was authorized under section 107 of the 1960 River and 
Harbor Act at an estimated Federal cost of $85,800. 
Local cooperation. For the section 107 modification, 
local interests are to provide all lands, easements, and 
rights-of-way required for construction of the project; 
for construction and maintenance of aids to navigation 
upon request of the Chief of Engineers; and contribute, 
in cash, 12.4 percent of the construction cost, now 
estimated at $12,200. 
Operations and results during fiscalyear. Preauthorization 
studies cost $3,752. 
228

WILMINGTON, N.C., DISTRICT 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. This is the first report 
since latest modification was authorized. 
8. LOCKWOODS FOLLY RIVER, N.C. 
Location. The project is located on the south coast of 
North Carolina about 12 miles west of Cape Fear 
River. (See Coast and Geodetic Survey Chart 1236 and 
Geological Survey Map of North Carolina.) 
Existing project. The authorized project provides for a 
channel 100 feet wide and 6 feet deep at low water from 
the ocean to the bridge at Supply 12.5 miles above, to 
be obtained by dredging through oyster rocks and 
mudflats. Only Lockwoods Folly Inlet and the 
connecting channel section to the Atlantic Intracoastal 
Waterway is active. The uncompleted river portion of 
the project above the waterway remains in the inactive 
category. Lunar tidal ranges in Lockwoods Folly River 
are 4.5 feet at the inlet and 2 feet at the head of 
navigation at Supply. Estimated cost of new work is 
$178,000 (revised 1965). The existing project was 
authorized by the 1890 River and Harbor Act (See 
Annual Report for 1887, page 1099.) 
Local cooperation. None required. 
Terminal facilities. Eight wharves on the Atlantic 
Intracoastal Waterway at Holden Beach, about 1.25 
miles west of Lockwoods Folly Inlet, with a total 
frontage of about 970 feet available. At Dixons 
Landing, about 2 miles upstream of the inlet, there are 
four wharves with a total frontage of 200 feet. 
Numerous natural landings are used for loading and 
unloading small boats. Berthing space in the vicinity of 
Lockwoods Folly Inlet totals about 1,170 feet. Facilities 
are considered adequate for present commerce. 
Operations and results during fiscal year. Maintenance: 
Between November 30, 1969 and January 15, 1970, the 
U. S. sidecasting dredge Merritt removed 72,961 cubic 
yards from shoals in the inlet at a cost of $36,075. 
Condition at end of fiscal year. The active portion of the 
project was completed in June 1965. 
9. MANTEO (SHALLOWBAG) BAY, N. C. 
Location. The project is located on the northeastern 
side of Roanoke Island, North Carolina. (See Coast 
and Geodetic Survey Chart 1229.) 
Existing project. The authorized project provides for a 
channel 14 feet deep and 400 feet wide from the 
Atlantic Ocean through Oregon Inlet with connecting 
12-foot channels, 100 feet wide, to Pamlico Sound, 
Manteo, and Wanchese; and a channel 6 feet deep and 
100 feet wide connecting the Manteo-Oregon Inlet 
Channel with Roanoke Sound. Length of channels is 
25.4 miles. The project was authorized by River and 
Harbor Acts of June 25, 1910; October 17, 1940; and 
May 17, 1950, and under section 107 of acts of July 14, 
1960. 
Local cooperation. Complied with. 
Terminal facilities. The project is served by 33 
waterfront facilities with a total frontage of 3,320 feet. 
Operations and results during fiscal year. Maintenance: 
Between July 15 and 21, 1969, the U. S. snagboat Snell 
repaired dredging and survey ranges at a cost of $3,685. 
Between August 10 and September 19, 1969, the U. S. 
sidecasting dredge Merritt removed 74,790 cubic yards 
from shoals in Oregon Inlet at a cost of $50,071. 
Between August 21 and October 21, 1969, the U. S. 
sidecasting dredge Schweizer removed 55,424 cubic 
yards from shoals in Oregon Inlet at a cost of $142,547. 
Between November 12 and December 11, 1969, the U. 
S. hopper dredge Hyde removed 40,531 cubic yards 
from shoals in Oregon Inlet at a cost of $139,044. 
Between March 25 and May 28, 1970, the contract 
dredge Richmond removed 361,396 cubic yards from 
shoals in Old House Channel and the channels to 
Oregon Inlet and Wanchese at a cost of $237,377. 
Condition and operation studies cost $42,461. 
Condition at end of fiscal year. The project is complete. 
(For further details, see Annual Report for 1962.) 
10. MOREHEAD CITY HARBOR, N.C. 
Location. The project is located on the northern shore 
of Bogue Sound, adjacent to Beaufort Inlet. (See Coast 
and Geodetic Survey Chart 420.) 
Previous project. For details see page 470 of Annual 
Report for 1935. 
Existing project. The authorized project provides for a 
bar channel 35 feet deep and 400 feet wide, thence an 
inner channel 35 feet deep and 300 feet wide, a turning 
basin 35 feet deep, and connecting shallow-draft 
channels. In general the project as it now exists was 
authorized by the 1958 River and Harbor Act (S. D. 
54, 84th Cong., 1st sess.). For further details see Annual 
Report for 1962. 
Local cooperation. Fully complied with. 
Terminal facilities. Twenty-six waterfront facilities 
serve the port, with a total frontage of 1,250 feet. 
Marine terminals provide 3,625 feet of berthing space, 
with a depth alongside of 35 feet, and facilities for 
transfer of cargoes between rail and water carriers. 
Improvements to facilities were completed in 1969. For 
further details see Port Series No. 16 (1954), Corps of 
Engineers. 
Operations and results during fiscal year. Maintenance: 
Between July 29 and August 8, 1969, the U. S. 
snagboat Snell repaired dredging and survey ranges at a 
cost of $2,523. Between October 6 and November 24, 
1969, the U. S. hopper dredge Gerig removed 853,930 
cubic yards from the ocean bar and entrance channels 
at a cost of $357,799. Between May 16 and June 30, 
1970, the contract dredge Talcott removed 350,000 
cubic yards from shoals in the entrance channel and 
turning basin at a cost of $223,888. Condition and 
operation studies cost $60,225. 
229

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end of fiscal year. The existing project is 
complete except for the jetties which were deferred. 
(For further details, see Annual Report for 1962.) Total 
cost of the existing project to June 30, 1970, was $9,225, 
992 of which $1,589,395 was for new work (including 
$553,477 public works funds) and $7,636,597 for 
maintenance. 
11. NEUSE RIVER, N. C. 
Location. Neuse River rises in the north central part of 
North Carolina near Raleigh, flows generally southeasterly 
to a point 30 miles below New Bern where it 
empties into Pamlico Sound. Total length about'350 
miles. (See Coast and Geodetic Survey Charts 538 and 
1231.) 
Existing project. The authorized project provides for a 
channel 300 feet wide and 12 feet deep at mean low 
water from a point 10 miles below, up to, and in front of 
New Bern; thence 120 feet wide and 10 feet deep, from 
the railroad bridge at New Bern to a point about 3 
miles upstream; a channel 4 feet deep at dead low 
water to Kinston; and, during 9 months of the year, 3 
feet deep at dead low water to Smithfield, to be 
obtained by dredging and snagging. The section 
included in the project is about 160 miles long. 
Estimated cost of new work is $488,200 (1964). The 
project was authorized by River and Harbor Acts of 
June 18, 1878; June 13, 1902; January 21, 1927; and 
two modifications, one providing for a channel 120 feet 
wide and 10 feet deep was authorized October 15, 1965 
and the other providing for a channel 6 feet deep and 
60 feet wide from the highway bridge across the mouth 
of Dawson Creek to deep water in the Neuse River was 
authorized August 4, 1969, both under authority of 
section 107, River and Harbor Act of 1960. 
Local cooperation. For the section 107 modification, 
local interests must provide all lands, easements, and 
rights-of-way required for construction and subsequent 
maintenance of the project, and for aids to navigation 
upon the request of the Chief of Engineers, including 
suitable spoil disposal areas and necessary retaining 
dikes, bulkheads, and embankments therefor, or the 
cost of such retaining works; hold and save the United 
States free from damages due to construction and 
maintenance of the project; continue to provide and 
maintain, without cost to the United States, necessary 
mooring facilities and utilities, including a public 
landing, with suitable supply facilities, open to all on 
equal terms; establish regulations prohibiting discharge 
of untreated sewage, garbage, and other 
pollutants in the waters of the creek by users thereof, 
which regulations shall be in accordance with 
applicable laws and regulations of Federal, State, and 
local authorities responsible for pollution prevention 
and control. 
Terminal facilities. There are thirty wharves on this 
stream, of which 2 are below New Bern, 16 at or near 
New Bern, 3 at Bridgeton, and 9 above New Bern. 
Total frontage is 2,900 feet. Facilities are considered 
adequate for present commerce. 
Operations and results during fiscal year. Detailed 
engineering and design studies for Dawson Creek cost 
$1,118. 
Condition at end of fiscal year. The project was 
completed in February 1966, except for the latest 
section 107 modification. (For further details, see 
Annual Report for 1950.) 
12. OCRACOKE INLET, N. C. 
Location. The inlet connects Pamlico Sound with the 
Atlantic Ocean, about 31 miles southwest of Cape 
Hatteras and 43 miles northeast of Cape Lookout. (See 
U. S. Coast and Geodetic Survey Chart No. 1232.) 
Existing project. The authorized project provides for a 
channel across the ocean bar 18 feet deep and 400 feet 
wide, and construction of a jetty extending from 
Ocracoke Island to the Atlantic Ocean. Construction 
of the jetty has been deferred for restudy. For further 
details, see Annual Report for 1962. 
Estimated new work cost for dredging (1969) is $346, 
000. The project was authorized by the River and 
Harbor Act of July 14, 1960. 
Local cooperation. Local interests have assured that all 
terms will be fulfilled. 
Terminal facilities. None required. 
Operations and results during fiscal year. New work: 
Between October 7 and 20, 1969, the U. S. snagboat 
Snell constructed dredging and survey ranges at a cost 
of $15,675. Between October 21 and November 26, 
1969, the U. S. sidecasting dredge Schweizer pumped 66, 
060 cubic yards from the inner channel between 
Teaches Hole and the inlet gorge at a cost of $74,212. 
Condition at end of fiscal year. No work has been done on 
dredging the channel across the inlet bar. 
13. ROLLINSON CHANNEL, N. C. 
Location. The project is located about 3.5 miles 
northeast of Hatteras Inlet. (See Coast and Geodetic 
Survey Chart 1232.) 
Existing project. The authorized project provides for a 
channel 12 feet deep, 100 feet wide, and about 5.1 miles 
long from deep water in Pamlico Sound to and 
including a basin of the same depth, 80 to 150 feet 
wide, and 1,450 feet long at Hatteras; a rubble-mound 
breakwater on each side of the channel at the entrance 
to the basin; and a channel 10 feet deep and 100 feet 
wide from that depth in Hatteras Inlet gorge to 
Rollinson Channel, in the vicinity of the basin at 
Hatteras. The project was authorized by the River and 
Harbor Acts of August 30, 1935; March 2, 1945; 
September 3, 1954; and October 23, 1962. For further 
details see Annual Report for 1961. 
Local cooperation. Complied with to date. 
230

WILMINGTON, N.C., DISTRICT 
Terminal facilities. Six waterfront facilities serve the 
channel, with a total frontage of 926 feet. Existing 
facilities are adequate for present commerce. 
Operations and results during fiscal year. Maintenance: 
Between July 13 and 19, 1969, the contract dredge 
Clarendon removed 41,181 cubic yards from shoals in the 
channel to Hatteras Inlet at a cost of $43,209. 
Condition at end of fiscal year. The project completed 
August 22, 1966. (For further details, see Annual 
Report for 1961.) 
14. SILVER LAKE HARBOR, N.C. 
Location. The project is located at the southwest end 
of Ocracoke Island, a portion of the Outer Banks on the 
southeast coast of North Carolina, separating Pamlico 
Sound from the Atlantic Ocean. (See Coast and 
Geodetic Survey Chart No. 1232.) 
Existing project. The authorized project provides for 
basin depths of 12 feet in Silver Lake Harbor; an 
entrance channel 12 feet deep and 60 feet wide, from 
the basin to Teaches Hole Channel; a channel, 12 feet 
deep and 150 feet wide, from the entrance channel 
through Big Foot Slough Bar to the 12-foot contour in 
Pamlico Sound; a channel, 12 feet deep and 150 feet 
wide, from the entrance channel through Teaches Hole 
Channel to the gorge in Ocracoke Inlet; a channel, 12 
feet deep and 150 feet wide, across Bluff Shoal; and for 
rubble-mound training walls on the north and south 
sides of the entrance channel, 300 feet and 400 feet 
long, respectively. Mean tidal ranges are 1.9 feet in the 
throat of Ocracoke Inlet and 1.0 foot at Ocracoke. 
Variations in the water surface of Pamlico Sound are 
generally due to winds and seldom exceed 1 or 2 feet 
above or below mean stage. Severe storms have raised 
the water surface as much as 7 feet above normal water 
level at Ocracoke. Estimated cost of new work is $106, 
000 (1965). (See table 6-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Twelve waterfront facilities serve 
the harbor. These facilities are adequate for existing 
commerce. 
Operations and results during fiscal year. New work: 
Between September 15 and November 17, 1969, a 
contractor constructed the south training wall at a cost 
of $52,133. Preparation of plans and specifications for 
new work dredging cost $86. Maintenance: Preparation 
of plans and specifications for maintenance 
dredging cost $5,675. 
Condition at end of fiscal year. The modification 
providing for the 12-foot deep channels has not been 
started except for the training wall which was 
completed in FY 1970. (For further details, see Annual 
Report for 1961.) 
15. WATERWAY CONNECTING PAMLICO 
SOUND AND BEAUFORT HARBOR, N.C. 
Location. The project is located in Core Sound, west of 
the outer banks of eastern North Carolina. (See Coast 
and Geodetic Survey Chart Nos. 420 and 1233.) 
Existing project. The authorized project provides for a 
through channel to Core Sound 7 feet deep and 75 feet 
wide from Pamlico Sound to Beaufort Harbor; an 
alternative route of the same dimensions through Back 
Sound by way of channels at the east and west ends of 
Harkers Island; a channel 7 feet deep and 70 feet wide 
from the through channel to the local harbor at Cedar 
Island, including the authorized passage and future 
maintenance of a channel through the existing private 
basin, and an access channel 6 feet deep, 50 feet wide 
and about 400 feet long to a basin the same depth, 60 
feet by 100 feet; a channel 7 feet deep and 75 feet wide 
from the through channel to Atlantic; a channel 7 feet 
deep and 75 feet wide, with a basin 200 feet by 500 feet, 
the same depth, at Sealevel; a channel 5 feet deep and 
75 feet wide, with basin 150 feet by 130 feet, the same 
depth, at Davis; a channel 6 feet deep and 60 feet wide, 
with a basin 100 feet by 600 feet, the same depth, at 
Marshallberg; an entrance channel 6 feet deep and 60 
feet wide, from Back Sound to a harbor of refuge 120 
feet by 250 feet, the same depth, in Brooks Creek at the 
west end of Harkers Island; and a channel 7 feet deep 
and 70 feet wide, from the existing side channel at 
Atlantic, N. C., to the mouth of Little Port Brook; 
thence 7 feet deep and 50 feet wide, along the Brook to 
a basin 600 feet long, 180 feet wide, and 7 feet deep, 
with a breakwater, beginning at a point between the 
mouth of Little Port Brook and White Point, running 
along the channel approximately 2,000 feet. Plane of 
reference is mean low water. The length of the 
authorized channels is about 50.6 miles. Estimated 
Federal cost of new work is $353,800 (1969). (See table 
6-B for authorizing legislation.) 
Local cooperation. Responsibilities for local cooperation 
have been complied with except for the harbor of 
refuge at Atlantic. For this modification, local interests 
must (a) provide all lands, easements, and rights-ofway 
for construction and maintenance, including 
suitable spoil disposal areas, and also necessary 
retaining dikes and embankments therefor, or the costs 
for such retaining works; (b) hold and save the United 
States free from damages due to the construction works 
and maintenance of the project; (c) provide and 
maintain at local expense, adequate public wharf, 
open to all on equal terms; and (d) establish a 
competent and properly constituted public body 
empowered to regulate the use, growth, and free 
development of the harbor facilities with the understanding 
that said facilities will be open to all on 
equal terms. In addition, at Atlantic, accomplish such 
alterations as required in sewer, water-supply, drainage, 
and other utility facilities, as well as their 
maintenance. Formal assurances have been requested. 
231

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Terminal facilities. Sixteen small wharves serve the 
waterway. Additional facilities are needed along Core 
Sound. 
Operations and results during fiscal year. New work: 
Preparation of plans and specifications cost $3,378 for 
Atlantic. Between June 17 and 30, 1970, the contract 
dredge Richmond removed 45,000 cubic yards to 
partially construct a Harbor of Refuge at the west end 
of Harkers Island at a cost of $42,152 of which $2,972 
was for project condition surveys. 
Condition at end of fiscal year. The project was 
completed in July 1965 except for side channel to 
Harkers Island and Atlantic. (For further details, see 
Annual Report for 1961.) 
16. WILMINGTON HARBOR, N. C. 
Location. The project is located on the Cape Fear 
River, on southeast coast of North Carolina, between 
the Atlantic Ocean and Wilmington, North Carolina. 
(See Coast and Geodetic Survey Chart No. 426.) 
Previous projects. For details, see page 1804 of Annual 
Report for 1915 and page 533 of Annual Report for 
1938. 
Existing project. The authorized project provides for a 
channel 40 feet deep and 500 feet wide from the 
Atlantic Ocean through the ocean bar and entrance 
channels to Southport, thence 38 feet deep and 400 feet 
wide to the upper end of the anchorage basin (foot of 
Castle Street) at Wilmington, thence 32 feet deep and 
400 feet wide, to Hilton Bridge over Northeast (Cape 
Fear) River; a 38-foot-deep anchorage basin at 
Wilmington; a 32-foot-deep turning basin opposite the 
principal terminals; a channel 12 feet deep and 100 
feet wide, about 3 miles long, in Cape Fear River; and 
a channel 25 feet deep and 200 feet wide from Hilton 
Bridge over Northeast (Cape Fear) River to a point 
1.66 miles above, including a turning basin of the same 
depth, 700 feet wide and 500 feet long, at a point 1.25 
miles above the bridge. The project was authorized by 
River and Harbor Acts of July 3, 1930; March 2, 1945; 
May 17, 1950; October 23, 1962; and March 10, 1964; 
under Section 107 of the 1960 River and Harbor Act. 
(For further details of authorization, see 1962 Annual 
Report.) Estimated Federal cost of new work is $13, 
751,000 (1969), exclusive of amounts expended on 
previous projects. 
Local cooperation. Fully complied with to date. 
Terminal facilities. Thirty-four principal wharves, 
piers, and docks at port of Wilmington, with a berthing 
space of about 18,000 linear feet serve the harbor. 
These facilities handle general cargo and petroleum 
products. For further details, see Port Series No. 12, 
part 2, revised 1960, Corps of Engineers. 
Operations and results during fiscal year. New work: 
Between July 1, 1969 and February 20, 1970, the 
dredges Carolina, Pittsburg and the dipper stick dredge 
Crest removed 2,251,122 cubic yards, including drilling 
and blasting operations, for providing 38-foot channel 
between Upper Lilliput Channel and Wilmington at a 
cost of $2,369,704. Work in connection with a claim of 
changed conditions by a contractor cost $54,794. 
Maintenance: Between July 1, 1969 and February 20, 
1970 the dredges Carolina and Pittsburg removed 934,190 
cubic yards from shoals between Upper Lilliput 
Channel and Wilmington at a cost of $194,988. During 
intermittent periods, the U. S. snagboat Snell repaired 
dredging and survey ranges at a cost of $4,172. Between 
March 3 and 27, 1970, the U. S. hopper dredge Gerig by 
agitating and hauling removed 985,866 cubic yards 
from the ocean bar channels at a cost of $257,624. 
Condition and operation studies cost $70,752. 
Condition at end of fiscal year. Remaining work consists 
of widening the ocean bar channel to 500 feet and for 
providing the channel, 32 feet deep and 400 feet wide, 
from Castle Street to Hilton Bridge. (For further 
details, see Annual Report for 1962.) Total cost for the 
existing project to June 30, 1970 was $25,996,703 of 
which $12,545,737 was for new work and $13,450,966 
was for maintenance. 
17. RECONNAISSANCE AND CONDITION 
SURVEYS 
(See Table 6-C.) 
18. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See Table 6-D.) 
19. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION 
Navigation activities pursuant to section 107, Public Law 86- 
645 (preauthorization) 
(See Table 6-E.) 
BEACH EROSION CONTROL 
20. FORT MACON STATE PARK, N. C. 
Location. The project is located on the barrier beach 
west of and adjacent to Beaufort Inlet. (See Coast and 
Geodetic Survey Chart 423.) 
232

WILMINGTON, N.C., DISTRICT 
Existing project. The authorized project provides for 
Federal participation by contribution of Federal 
funds for one-third of the first cost of measures applicable 
to State-owned shores completed prior to 
October 23, 1962, and 70 percent of cost for the remaining 
uncompleted work. The project will consist 
of initial restoration of 7,750 feet of beach berm along 
ocean shore to an elevation of 8 feet with a crown 
width of 100 feet; and construction at Fort Macon 
Point of a stone revetment to an elevation of 12 feet 
and about 250 feet long; a stone masonry wall to an 
elevation of 12 feet and about 530 feet long; and a 
stone groin to an elevation of 9 feet and about 1,670 
feet long, extending seaward from Fort Macon Point 
and approximately paralleling the Beaufort inlet channel. 
Approved estimated cost for new work (1969) is 
$1,348,000. The project was authorized by the 1962 
River and Harbor Act (H. D. 555, 87th Cong.,2d sess.) 
Local cooperation. Local interests are to obtain 
approval by the Chief of Engineers before starting 
remaining work on project, of detailed plans and 
specifications for that work and also the arrangements 
for prosecuting work; furnish assurances satisfactory to 
the Secretary of the Army that they will maintain the 
protective measures and provide periodic nourishment 
during their economic life, as may be required to serve 
their intended purposes; control water pollution to the 
extent necessary to safeguard the health of bathers; 
maintain continued public ownership of the shores 
upon which the Federal participation is based, and 
their administration for public use during the economic 
life of the project; exclude all permanent habitation, 
including residences, from the park, except the 
residences of park administrative and maintenance 
personnel; in accordance with the overall mission or 
purpose of the park, operate and maintain the area in a 
manner which will preserve the desirable features and 
the natural resources of the locale; and continue to 
provide suitable access, and bathhouse, comfort, 
parking, and recreational facilities, adequate to insure 
realization of anticipaed recreational benefits. An 
agreement between the United States and State of 
North Carolina (the cooperating agency) providing for 
accomplishment of work for the Fort Macon project 
was approved on June 25, 1964. 
Operations and results during fiscal year. The State of 
North Carolina was reimbursed 70 percent of the cost 
of construction work it had accomplished in FY 1970 
amounting to $212,523. Supervision and administration 
cost $2,820. 
Condition at end of fiscal year. Construction of the 
project is about 60 percent complete. 
21. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECTS 
(See Table 6-E.) 
FLOOD CONTROL 
22. BLACK RIVER, HARNETT COUNTY, 
N. C. 
Location. The river rises near Angier in Harnett 
County, N. C., and flows in a southerly direction about 
25 miles to its confluence with South River. (See Army 
Map Service quadrangle sheet 5254, Fayetteville, N. 
C.)
Existing project. The project consists of 5.5 miles of 
channel excavation on Black River, beginning at a 
point 8,000 feet below County Road 1780, with a 35- 
foot bottom width to the Durham and Southern 
Railroad. Estimated Federal construction cost is $120, 
000 (1967). The project was approved by the Chief of 
Engineers on February 9, 1968, under Section 205, 
1948 Flood Control Act, as amended. 
Local cooperation. Local interests must provide all 
lands, easements, rights-of-way, utility relocations and 
alterations, and highway or highway-bridge construction 
and alterations necessary for project 
construction; hold and save the United States free from 
damages; and maintain and operate project after 
completion. Formal assurances have been requested. 
Operations and results during fiscal year. New work: 
Detailed engineering and design cost $12,472. 
Condition at end of fiscal year. The project is in 
preconstruction planning stage. 
23. BROAD CREEK, BEAUFORT COUNTY, 
N.C. 
Location. The stream originates in J & W Dismal 
Swamp about 6 miles northeast of Washington, N.C., 
in Beaufort County, and flows southward 10.8 miles to 
the Pamlico River. (See Geological Survey quadrangle 
sheet, Bunyan, N. C.) 
Existing project. The project consists of clearing and 
snagging Broad Creek from secondary road 1325 
upstream 0.7 mile; thence excavating a channel 40 feet 
wide, with depths ranging from 4 to 7 feet, along Broad 
Creek for 2.1 miles; thence 35 feet wide, with depths 
ranging from 6 to 7 feet, to its confluence with 
Beaverdam Creek, about 1.0 mile; thence 30 feet wide, 
with depths ranging from 6 to 7 feet, to its confluence 
with Hall Swamp, about 0.9 mile; thence 10 feet wide, 
with depths ranging from 5 to 7 feet, to secondary road 
1507, 2.0 miles; excavating a channel along Beaverdam 
Branch, 20 feet wide, with depths ranging from 
5 to 7 feet, from its mouth to secondary road 1520, 2.8 
miles, thence 15 feet wide, to the same depth range, to 
secondary road 1507, 1.8 miles. Estimated Federal cost 
233

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
of construction is $186,000 (1969). The project was 
approved by Chief of Engineers, 12 December 1966, 
under section 205, 1948 Flood Control Act, as 
amended. 
Local cooperation. Local interests must provide lands, 
easements, rights-of-way, utility relocations and 
alterations, and highway or highway-bridge construction 
and alterations necessary for project 
construction; hold the United States free from 
damages, and adjust claims concerning water rights; 
maintain and operate project after completion; 
contribute 14.4 percent of construction costs; and 
prevent future encroachment. Formal request has been 
made. 
Operations and results during fiscal year. New Work: 
Detailed engineering and design cost $1,523. 
Condition at end of fiscal year. The project is in 
preconstruction planning stage. 
24. BRUNSWICK COUNTY BEACHES, N. C. 
(CAPE FEAR TO NORTH CAROLINASOUTH 
CAROLINA STATE LINE) 
Location. The project is in Brunswick County, on the 
South Atlantic coast of North Carolina, between the 
mouth of the Cape Fear River and North Carolina- 
South Carolina State Line. (See Coast and Geodetic 
Survey Charts 1236 and 1237.) 
Existing project. The project provides for integral 
construction of a dune near the building line, with a 
crown width of 25 feet, at an elevation of 20 feet above 
mean sea level, and a 50-foot beach berm at elevation 
15, along 3,600 feet of Yaupon Beach, 43,600 feet of 
Long Beach, 40,000 feet of Holden Beach, 28,000 feet 
of Ocean Isle Beach, and 6,000 feet of Sunset Beach; 
and Federal participation in the cost of beach 
nourishment for a period of 10 years. Approved 
estimated cost for new work (1970) is $28,100,000. The 
project was authorized by the 1966 Flood Control Act 
(H. D. 511,89th Cong., 2d sess.) 
Local cooperation. Local interests must (a) provide all 
lands, easements, and rights-of-way, including borrow 
areas necessary for construction; (b) accomplish all 
relocations and alterations to sewerage and drainage 
facilities, buildings, streets, utilities, and other 
structures; (c) hold and save the United States free 
from damages; (d) contribute 30 percent of the first 
costs allocated to hurricane protection and 50 percent 
of those allocated to beach stabilization, with credit 
allowed for (a) and (b); (e) provide periodic 
nourishment for preservation of the protective beach as 
may be required to serve the intended purposes; (f) 
maintain the protective works after completion; (g) 
provide and maintain public ownership, during the 
economic life of the project, of an adequate width of 
beach for public use, with acceptable access, parking 
areas, and other facilities necessary for realization of 
the benefits upon which Federal participation is based; 
(h) adopt and enforce ordinances to provide for 
preservation of the improvement and its protective 
vegetation; (i) control water pollution to the extent 
necessary to safeguard the health of bathers; and (j) 
adequately inform affected interests that the project 
will not provide protection against ocean-storm surges 
and wave action greater than those which accompanied 
Hurricane Hazel on 15 October 1954, nor 
will the protection have any substantial effect on storm 
tides in the sounds and other waters adjacent to the 
barrier islands, and that, during hurricanes and severe 
northeast storms, all normal precautions, including 
evacuation, must be taken as advised by appropriate 
authority. 
Operations and results during fiscal year. Preconstruction 
planning cost $5,732. 
Condition at end of fiscal year. Construction has not 
started. The project is in the preconstruction planning 
stage. 
25. CAPE FEAR RIVER BASIN, N.C. 
Location. Works covered by this project consists of a 
series of dams and reservoirs on tributaries of the Cape 
Fear River in North Carolina within a radius of 100 
miles from Raleigh, North Carolina. (See Geological 
Survey Map of North Carolina.) 
Existing project. Public Law 88-253, approved 
December 30, 1963, authorized three principal dams 
and reservoirs and a series of smaller reservoirs on 
triubtaries of the Cape Fear River in accordance with 
the comprehensive plans in House Document 508, 87th 
Congress, 2d session. The act also provides that the 
appropriate agencies of the Departments of the Army 
and Agriculture shall conduct joint investigations and 
surveys and prepare a report on the upper tributaries of 
the Cape Fear River in the interest of watershed 
protection and flood prevention, and the conservation, 
development, utilization, and disposal of water. The 
report is to be prepared and submitted in compliance 
with provisions of Public Law 87-639. A list of the dams 
and reservoirs included in the comprehensive plan 
follows. Estimates of cost as given are based on 1960 
price levels, except the ones for New Hope, Randleman, 
and Howards Mill Lakes, which were revised 
in 1970. These three projects have been authorized for 
construction in accordance with the above 
authorization. The joint study, to be accomplished by 
the Departments of the Army and Agriculture, is 
underway. 
Local cooperation. Requirements are given in the 
individual project reports. (See Table 6-G on dams and 
reservoirs.) 
234

WILMINGTON, N.C., DISTRICT 
25A. NEW HOPE LAKE, N. C. 
Location. The project is located on the Haw River, N. 
C., 4.3 miles above its mouth, and 2.5 miles north of 
Moncure, N. C. 
Existing project. The project will consist of an earth 
dam 1,330 feet long with a maximum height of 112 feet 
above the streambed, an uncontrolled, unpaved chute 
spillway, and a controlled 19-foot-diameter outlet 
structure. Some saddle dikes are required beyond the 
spillway. The reservoir will have a gross storage 
capacity of 778,000 acre-feet, of which 595,000 acrefeet 
will be for flood control and a conservation pool of 
183,000 acre-feet for water-quality control, water 
supply, and sedimentation. The reservoir will be 
operated as a unit of a coordinated system for control of 
floods in the Cape Fear River Basin and for water 
supply, water-quality control, and other purposes. 
Estimated cost for new work is $41,100,000 (1970), 
consisting of $13,219,000 for construction, including 
$440,000 presently allocated to water supply to be paid 
for in the future by local interests, and $27,881,000 for 
lands and damages, including highway, railroad, and 
utility relocations. The existing project was authorized 
by Public Law 88-253 approved December 30, 1963 
(H. D. 508, 87th Cong., 2d sess.) 
Local cooperation. Local interests must protect downstream 
channels from encroachments and obstructions 
which would adversely affect operation of the project; 
reimburse the Federal Government for all costs 
allocated to municipal and industrial water supply, 
presently estimated at $440,000; and bear all annual 
costs for operation, maintenance, and major replacements 
allocated to municipal and industrial water 
supply, an amount presently estimated at $8,000 
annually. Assurances that these obligations for water 
storage would be assumed have been received from the 
Department of Water Resources, State of North 
Carolina. 
Operations and results during fiscalyear. New work: Real 
estate acquisition continued. Two contracts for 
relocation of the Norfolk Southern Railway and 
relocation of U. S. Route 64 were awarded in May 
1970 and June 1970, respectively. Status of plans and 
specifications: Recreation facilities and roads were 78 
percent completed; relocation of U. S. Highway 64, 
100 percent; relocation of Norfolk-Southern Railroad, 
100 percent; N. C. Road 1938, 100 percent; N. C. 
Road 1939 at Robeson Creek, 100 percent; N. C. Road 
751 at Whiteoak Creek, 90 percent; N. C. Road 1743, 
96 percent; N. C. Road 1900, 100 percent; N. C. Road 
1906, 87 percent; N. C. Road 1939 at Stinking Creek 
Roadway, 96 percent; N. C. Road 751 at Northeast 
Creek, Indian Creek, and Lick Branch, 25 percent; N. 
C. Road 1715 and 1941 Roadway, 50 percent and 
bridge, 100 percent; N. C. Road 1726, 60 percent; 
water quality monitoring system, 95 percent; and dam, 
spillway, outlet works, and diversion, were 98 percent 
completed. Construction expenditures were $2,132, 
513. 
Condition at end of fiscal year. No construction work on 
the dam was accomplished. 
25B. RANDLEMAN LAKE, N. C. 
Location. The project is located on Deep River, N. C., 
about 15 miles south of Greensboro and about 2 miles 
upstream from the town of Randleman. The damsite 
and about two-thirds of the reservoir would lie in 
Randolph County. The upper one-third of the 
reservoir would lie in Guilford County. 
Existing project. The authorized project provides for 
construction of an earth dam 2,130 feet long with a 
maximum height of 102 feet above the streambed to 
create a reservoir with gross storage of 105,000 acrefeet, 
consisting of 45,000 acre-feet for flood control and 
a conservation pool of 60,000 acre-feet for water 
supply, water-quality control and sedimentation. 
Randleman Lake is the second project of the 
comprehensive plan of development for the Cape Fear 
River basin, providing reservoir storage for flood 
control, water supply, water-quality control, and 
recreation. The project items may be modified during 
detailed preconstruction planning. Estimated cost of 
new work is $15,800,000 (1970), consisting of $7,570, 
000 for construction (including $1,896,000 presently 
allocated to water supply and $822,000 allocated to 
general recreation and fish and wildlife to be paid for in 
the future by local interests) and $8,230,000 for lands 
and damages, including relocations. The existing 
project was authorized by the 1968 Flood Control Act 
(H. D. 343, 90th Cong., 2d sess.) 
Local cooperation. Local interests must: (a) In 
accordance with the Federal Water Project Recreation 
Act, administer project land and water areas for 
recreation and fish and wildlife enhancement; pay, 
contribute in kind, or repay (which may be through 
user fees) with interest, one-half of the separable cost 
allocated to recreation and fish and wildlife enhancement, 
presently estimated at $822,000; and bear 
all costs of operation, maintenance, and replacement of 
recreation and fish and wildlife lands and facilities, 
presently estimated at $34,000 annually; (b) pay to the 
United States all costs allocated to water supply, in 
accordance with the Water Supply Act of 1958, as 
amended, presently estimated at $1,896,000 for 
construction and $12,000 annually for operation, 
maintenance, and major replacements; (c) hold and 
save the United States free from damages due to waterrights 
claims resulting from construction and operation 
of the project; (d) prevent encroachment on downstream 
channels to the extent needed to provide 
effective reservoir operation; (e) undertake all practical 
measures to control pollution of the stream which is 
subject to low-flow augmentation by adequate 
treatment or other methods of controlling wastes at 
their source; and (f) exercise to the full extent of their 
235

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
legal capability control against removal of streamflow 
made available for water quality control. Reasonable 
assurances that the requirements will be fulfilled have 
been received. 
Operations and results during fiscal year. Advanced 
engineering and design cost $2,025. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. 
26. CAROLINA BEACH AND VICINITY, 
NORTH CAROLINA 
Location. The project is in New Hanover County, 
about 15 miles southeast of Wilmington, N. C., on the 
peninsula which separates lower Cape Fear River from 
Atlantic Ocean. (See Coast and Geodetic Survey Map 
834.) 
Existing project. The authorized project provides for 
construction of a dune with a base generally bordering 
at or near the building line, with a crown width of 25 
feet at an elevation of 15 feet above mean low water, 
together with integral construction of a beach berm 
with a crown width of 50 feet at elevation 12, extending 
about 25,800 feet from the northern limits of Carolina 
Beach to the southern limits of Kure Beach; initial 
deposition of sufficient suitable material north of 
Carolina Beach to serve as a feeder beach; and Federal 
participation in the cost of beach nourishment for a 
period not to exceed 10 years from the year of initial 
placement. Approved estimated cost for new work 
(1969) is $4,464,000. The project was authorized by the 
1962 Flood Control Act (H. D. 418, 87th Cong., 2d 
sess.) 
Local cooperation. Local interests must: (a) Provide 
lands, easements, and rights-of-way for construction; 
(b) make required relocations and alterations of streets, 
utilities, or structures; (c) contribute 37.9 percent of the 
total first cost, with credit allowed for (a) and (b); (d)- 
hold the United States free from damages; (e) maintain 
all works after completion; (f) maintain continued 
public ownership of the shore; (g) adopt and enforce 
appropriate ordinances to provide for preservation of 
improvement and its protective vegetation; (h) control 
water pollution to extent necessary to safeguard health 
of bathers; and (i) at least annually inform interests 
affected that project will not provide any substantial 
protection from ocean surges higher in elevation than 
that of Hurricane Hazel, October 15, 1954. Requirements 
have been fulfilled to date for the town of 
Carolina Beach portion of the project only. No 
assurances for the remaining portion have been 
received. 
Operations and results during fiscalyear. Between April 13 
and June 5, 1970, the contract dredge Hampton Roads 
removed 282,423 cubic yards from a borrow area 
between the inlet and the Intracoastal Waterway for 
emergency repairs to the beach fill at the north end of 
the beach at a cost of $291,159. This work was 
accomplished under emergency flood control activities. 
Engineering and design studies cost $3,225. 
Condition at end of fiscal year. No construction work has 
been done on the area south of Carolina Beach or on 
the emergency repairs (stone seawall) at the north end. 
27. CONOHO CREEK, N.C. 
Location. The stream flows along the northern 
boundary of Martin County, N. C., and extends 
slightly into Halifax County, Conoho Creek is about 27 
miles long from its source in Halifax County to its 
confluence with the Roanoke River in Martin County. 
(See U.S. Geological Survey quadrangle sheet, 
Williamston, N. C.) 
Existing project. The project consists of clearing and 
snagging the existing Conoho Creek channel from N.C. 
Highway 125 upstream, 3.9 miles; thence excavating 
upstream a 35-foot-bottom-width channel, 6.4 miles; 
excavating a 10-foot-bottom-width channel 2.8 miles 
long to County Road 1336, a total of 13.1 miles; 
excavating on Etheridge Swamp a 20-foot-bottomwidth 
channel from the mouth of Etheridge Swamp 
near County Road 1323 upstream 1.6 miles; from this 
point on Etheridge Swamp, excavating a 10-footbottom-
width channel on Etheridge Swamp from its 
confluence with Water Swamp upstream 1.4 miles; 
excavating on Water Swamp a 10-foot-bottom-width 
channel 1.4 miles long, a point about 0.5 mile upstream 
from County Road 1329. Estimated total project cost 
(1966) is $418,000, including $242,500 Federal cost 
and non-Federal cost of $175,500 ($73,900 cash 
contribution, $30,600 lands, and $71,000 auxiliary 
drainage). The project was approved by the Chief of 
Engineers on June 12, 1969, under Section 205, 1948 
Flood Control Act, as amended. 
Local cooperation. Local interests must provide lands, 
easements, rights-of-way, utility relocations and 
alterations, and highway-bridge construction and 
alterations necessary for project construction; hold and 
save the United States free from damages; maintain 
and operate the project after completion; prevent 
future encroachment; contribute, in cash, 23.4 percent 
of construction costs; accomplish auxiliary drainage 
works necessary to realize the full benefits from the 
Federal improvement; and encourage individual 
landowners to adopt land-use and treatment measures 
to minimize the disposition of soil in the channel. 
Formal request has not been made for the requirement 
of local cooperation. 
Operations and results during fiscalyear. Engineering and 
design studies cost $23,631 during the fiscal year. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. 
28. ELLIS SWAMP, GATES COUNTY, N. C. 
Location. Ellis Swamp rises in the western portion of 
Gates County, N. C., flows generally southeast about 6 
236

WILMINGTON, N.C., DISTRICT 
miles, and empties into the Chowan River. (See 
Geological Survey quadrangle sheet, Winton, N. C.) 
Existing project. The project provides for a 15-footbottom-
width channel along Ellis Swamp beginning at 
a point about 8,800 feet above the mouth and 
extending upstream about 16,960 feet to the Seaboard 
Coast Line Railroad; thence an 8-foot-bottom-width 
channel about 11,040 feet to County Road 1126; and 
an 8-foot-bottom-width channel along Northeast 
Branch from Ellis Swamp upstream about 5,400 feet to 
near County Road 1122. Estimated Federal cost of 
construction is $74,000 (1966). The project was 
approved by the Chief of Engineers on February 6, 
1968, under Section 205 of the 1948 Flood Control Act, 
as amended. 
Local cooperation. Complied with to date. 
Operations and results during fiscal year. New work: A 
contract was awarded June 30, 1969. The contractor 
cleared and excavated 6 miles of channel at a cost of 
$60,891. 
Condition at end offiscalyear. Construction is 98 percent 
complete. All work is scheduled to be completed in July 
1970. 
29. FILBERTS CREEK, N. C. 
Location. Filberts Creek rises northwest of the town of 
Edenton, flows generally south through the western 
part of the town, about 2.4 miles and empties into the 
mouth of Pembroke Creek, a tributary of Albemarle 
Sound. (See Coast and Geodetic Survey Chart 1228 
and Army Map Service Quadrangle Sheet Edenton, N. 
C.)
Existing project. The project provides for a channel 
from the mouth of Filberts Creek upstream 1.1 miles to 
the N. C. Highway 32 bridge, with bottom widths 
varying from 30 feet to 10 feet and an average depth of 
about 6 feet. Estimated Federal cost of construction is 
$29,500 (1968). The project was approved by the Chief 
of Engineers on December 19, 1967, under Section 208 
of the 1954 Flood Control Act. 
Local cooperation. Fully complied with to date. 
Operations and results during fiscal year. Funds in the 
amount of $9,712 were transferred from the project. 
The project was turned over to local interests during 
the year. 
Condition at end of fiscal year. The project was 
completed in June 1969, and transferred to local 
sponsor for operation and maintenance. 
30. GARDNERS CREEK, N. C. 
Location. Gardners Creek rises in the southeastern 
part of Martin County and flows northward about 11 
miles to Devils Cut, which is cutoff in the Roanoke 
River near Jamesville, North Carolina. (See U. S. 
Geological Survey Map of North Carolina.) 
Existing project. The project provides for constructing 
a channel between N. C. Highway 171 and County 
Road 1547, a distance of 4.2 miles, having a bottom 
width of 12 feet and an average depth of 8 feet, with 
side slopes of 1 horizontal to 1 vertical. Estimated 
Federal cost of construction is $33,100 (1966). The 
project was approved by the Chief of Engineers on 
November 25, 1966, under Section 208 of the 1954 
Flood Control Act. 
Local cooperation. Local interests must provide all 
lands, easements, rights-of-way, utility relocations and 
alterations, and highway or highway-bridge construction 
and alterations necessary for project 
construction; hold and save the United States free from 
damages due to the construction works, and adjust all 
claims concerning water rights; maintain and operate 
the project after completion; prevent future encroachment 
which might interfere with proper 
functioning of the project for flood control; and 
contribute 21.9 percent of construction cost. Complied 
with to date. 
Operations and results during fiscal year. New work: The 
contractor cleared and excavated 5 miles of channel at 
a cost of $34,009. 
Condition at end of fiscal year. The contract work is 94 
percent complete. Work is scheduled to be complete in 
August 1970. 
31. HOMINY SWAMP, N.C. 
Location. Hominy Swamp, a tributary of Contentnea 
Creek, is located in central Wilson County and the 
Coastal Plain region of North Carolina. (See U.S. 
Geological Survey quadrangle sheet Wilson, N. C.) 
Existing project. The project consists of 5.1 miles of 
stream-channel improvement by enlarging and deepening 
the existing channel to a 35-foot-bottom-width 
from a point 800 feet below the sewage outfall canal at 
Plant No. 2 to Park Avenue, 3.4 miles; enlarging and 
deepening the existing channel to a 30-foot-bottomwidth 
from Park Avenue to the confluence of Big 
Hominy Swamp and Little Hominy Swamp, 1.7 miles; 
and adding a 12-foot-diameter culvert under the 
Seaboard Coast Line Railroad. Estimated total project 
cost (1967) is $298,000, including $186,000 Federal 
cost and non-Federal cost of $112,000 ($56,000, lands, 
rights-of-way and legal fees; $56,000 for sewer 
alterations and bridge modifications.) The project was 
approved by the Chief of Engineers on November 21, 
1968, under Section 205, of the 1948 Flood Control 
Act, as amended. 
Local cooperation. Local interests must provide all 
lands, easements, rights-of-way, utility relocations and 
alterations, and highway or highway-bridge construction 
and alterations necessary for project 
construction; hold and save the United States free from 
damages due to the construction works, and adjust all 
claims concerning water rights; maintain and operate 
the project after completion; and prevent future 
encroachment which might interfere with proper 
;7 
451-584 0-72-16

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
functioning of the project for flood control. Formal 
assurances have been requested. 
Operations and results during fiscal year. Detailed 
preconstruction planning cost $10,829 for new work. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. 
32. JOYCE CREEK, CAMDEN COUNTY, 
N. C. 
Location. Joyce Creek rises in the northeastern part of 
Camden County, N. C., and flows generally southeast 
southwest about 10 miles to Turners Cut near South 
Mills, North Carolina. (See Coast and Geodetic Survey 
Chart 1227 and Army Map Service quadrangle sheet, 
South Mills, N. C.) 
Existing project. The project consists of excavating a 
channel, 40 feet wide, from the confluence with 
Turners Cut to County Road 1224 at Tar Corner, 3.9 
miles; thence a channel, 30 feet wide, to the confluence 
with Mill Run and Cypress Run, 1.7 miles; thence on 
Cypress Run, a channel, 10 feet wide, to County Road 
1233, 1.8 miles; and on Mill Run, a 10-foot-wide 
channel from confluence with Joyce Creek to County 
Road 1232, 2.2 miles; a total of 9.6 miles. Estimated 
Federal construction cost (1969) is $187,500. The 
project was approved by the Chief of Engineers on 
March 29, 1967, under section 205 of the 1948 Flood 
Control Act, as amended. 
Local cooperation. Local interests must provide all 
lands, easements, rights-of-way, utility relocations and 
alterations, and highway or highway-bridge construction 
and alterations necessary for construction; 
hold the United States free from damages; maintain 
and operate the project after completion; prevent 
future encroachment; provide a cash contribution of 
21.5 percent of construction costs; and accomplish 
associated drainage works necessary to realize the 
benefits from the Federal improvement. Local interests 
have given assurances that they will initiate procedures 
to form a drainage district. 
Operations and results during fiscal year. New work: 
Detailed engineering and design cost $656. 
Condition at end offiscalyear. Preconstruction planning 
has been completed. 
33. LICK RUN, ROANOKE, VA. 
Location. Lick Run rises northwest of Roanoke, 
Virginia, flows generally southeastward 7.4 miles, and 
enters Tinker Creek at a point about 1 mile upstream 
from Roanoke River. (See U.S. Geological Survey 
quadrangle sheet, Roanoke, Va.) 
Existing project. The project provides for excavating 
and paving a channel, with 30-foot bottom width, 
vertical sides, and depth of 10 feet, along Lick Run, 
from the storm-sewer outlet in the City of Roanoke, 
downstream, to the confluence with Tinker Creek, a 
distance of about 6,000 feet. Estimated Federal cost for 
new work is $784,700 (1970). The project was approved 
by the Chief of Engineers on May 24, 1967, under 
Section 205, of the 1948 Flood Control Act, as 
amended. 
Local cooperation. Local interests must: (a) Provide all 
lands, easements, rights-of-way, utility relocations and 
alterations, bridge alterations, and railroad-structure 
relocations necessary for construction, including 
modification of 8-1/2 Street bridge, three power poles, 
one sewer manhole, one gas valve, and two railroad 
structures; (b) hold and save the United States free 
from damages, and adjust all claims concerning water 
rights; (c) maintain and operate the project, after 
completion, in accordance with regulations prescribed 
by the Secretary of the Army; (d) prevent future 
encroachment which might interfere with proper 
functioning of the project; (e) contribute, in cash, 18.7 
percent of the construction cost; (f) construct storm 
sewers as contained in city of Roanoke's plan of 
improvement; and (g) inform affected interests 
annually that the improvements do not provide 
complete protection. Formal assurances have been 
received. 
Operations and results during fiscal year. New work: 
Detailed preconstruction planning cost, $10,224. A 
construction contract of $1,069,706 was awarded in 
June 1970. 
Condition at end of fiscal year. Construction has not 
started; however, work is scheduled to be completed in 
December 1971. 
34. MACKAY CREEK, N. C. 
Location. Mackay Creek, also known locally as 
Kendricks Creek, originates in East Dismal Swamp, 
and flows northward for about 7.3 miles through 
Washington County into Albemarle Sound. (See U.S. 
Geological Survey quadrangle sheets, Roper North 
and Roper South, N. C.) 
Existing project. The original project provides for 
clearing and snagging Mackay Creek from County 
Road 1300 upstream 3.2 miles, thence excavating a 
channel 60 feet wide, depths 10 to 15 feet, 2.8 miles to 
confluence with Swinson Swamp, a total of 6.0 miles; 
and excavating a channel 20 feet wide, depths 5 to 6 
feet, along Beaverdam Branch from its mouth to 
County Road 1329, a distance of 2.7 miles. The 
supplement to the project, which has been combined 
with the original project described above, consists of 
excavating a 30-foot-bottom-width channel along 
Upper Mackay Creek, from the confluence of Swinson 
Swamp to County Road 1127, a distance of about 4.1 
miles; and excavating a 25-foot-bottom-width channel 
along No. 4 canal, from County Road 1127 to Canal 
"C", a distance of about 2.5 miles. Estimated project 
cost (1968) is $830,000, including Federal cost of $394, 
800 and non-Federal costs of $435,200 ($77,200 cash 
contribution; $153,000 rights-of-way, legal fees and 
roadway structures; and $205,000 auxiliary drainage 
238

WILMINGTON, N.C., DISTRICT 
works). The project was approved by the Chief of 
Engineers on December 1966 (Detailed Project 
Report) and June 23, 1969 (Supplement to the 
Detailed Project Report), under Section 205 of the 
1948 Flood Control Act, as amended. 
Local cooperation. Local interests will provide all lands, 
easements, rights-of-way, relocations and alterations, 
and highway or highway-bridge construction 
necessary; hold and save the United States free from 
damages; maintain and operate project; prevent future 
encroachment; contribute, in cash, 16.3 percent of the 
channel construction cost (for both upper and lower 
Mackay Creek); accomplish associated drainage works 
necessary to realize the benefits from the Federal 
improvement; and encourage individual landowners to 
adopt land-use treatment measures to minimize the 
deposition of spoil in the channels. 
Operations and results during fiscal year. Detailed 
preconstruction planning cost $5,746 for new work. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. 
35. MILL CREEK, N. C. 
Location. Mill Creek lies on the south side of the 
Neuse River, between Smithfield and Goldboro, in 
southern Johnston County, North Carolina. (See U. S. 
Geological Survey quadrangle sheet, Four Oaks, N. C.) 
Existing project. The project consists of clearing and 
snagging 3.8 miles of Mill Creek channel; excavating a 
40-foot-bottom-width channel on Mill Creek from mile 
3.8 to mile 10.5, 6.7 miles; excavating a 30-footbottom-
width channel on Hannah Creek from its 
mouth to mile 7.5; excavating a 20-foot-bottom-width 
channel on Hannah Creek from mile 7.5 to mile 11.9, 
4.4 miles, a total of 18.6 miles of channel excavation; 
and constructing a dam and reservoir with public 
access facilities on upper Hannah Creek. Estimated 
total project cost (1967) is $535,000, including $495, 
000 Federal cost and non-Federal cost of $40,000 ($14, 
000, cash contribution and $26,000 for rights-of-way 
and legal fees). The project was approved by the Chief 
of Engineers on October 1, 1968, under Section 205, of 
the 1948 Flood Control Act, as amended. 
Local cooperation. Local interests must provide all 
lands, easements, rights-of-way, utility relocations and 
alterations necessary for project construction; hold and 
save the United States free from damages due to 
construction works, and adjust all claims concerning 
water rights; maintain and operate the project after 
completion; contribute in cash 2.75 percent of 
construction costs; prevent future encroachment which 
might interfere with proper functioning of the project 
for flood control; and encourage individual landowners 
to apply land-treatment measures to lands within the 
basin to minimize soil erosion and subsequent silt 
deposition in the improved channels. 
Operations and results during fiscal year. Detailed 
preconstruction planning cost $15,465 for new work. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stages. 
36. MOCCASIN SWAMP, N. C. 
Location. The stream rises near the town of Selma. It 
flows in a south-southeasterly direction to its confluence 
with the Neuse River at the Johnston-Wayne 
Counties line, a distance of 18.75 miles. (See Army 
Map Service Sheet, Raleigh, N. C.) 
Existing project. The project provides for channel 
improvement by excavating a 20-foot bottom width 
channel along Moccasin Swamp, from its confluence 
with the Neuse River upstream to Tyners Old Mill 
Dam, 6.0 miles; constructing a 5-foot to 6-foot high 
spoil dike, 2.1 miles, and constructing a 2-foot high 
spoil dike, 0.9 mile. Total length of the project is 6 
miles. Estimated Federal cost of construction is $125, 
000. The project was approved by the Chief of 
Engineers on July 14, 1969, under section 205, of the 
1948 Flood Control Act, as amended. 
Local cooperation. Local interests must provide all 
lands, easements, rights-of-way, utility relocations and 
alterations, and road or bridge construction and 
alterations necessary for project construction; hold and 
save the United States free from damages; maintain 
and operate the project after completion; contribute 10 
percent of the construction costs; prevent future 
encroachment; accomplish the associated drainage 
work necessary to realize the benefits; and encourage 
individual landowners to apply land-treatment measures 
to lands within the basin to minimize soil erosion 
and subsequent deposition of soil in the improved 
channel. Requirements of local cooperation are 
expected to be provided by June 1971. 
Operations and results during the fiscal year. Preauthorization 
studies cost $1,312, and detailed preconstruction 
planning cost $448 for new work, a total of 
$1,760. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. This is the first report 
since authorization. 
37. MOYOCK CREEK, N.C. 
Location. The Moyock Watershed, consisting of 
Moyock Creek and Mill Run, is located east and south 
of the town of Moyock in Currituck County, North 
Carolina. (See U. S. Geological Survey quadrangle 
sheet, Moyock, Va., N. C.) 
Existing project. The project consists of excavating a 
30-foot-bottom-width channel on Mill Run, from the 
confluence with Roland Creek and Tull Creek to 
County Road 1227, 7.2 miles; on Moyock Creek, a 25- 
foot-bottom-width channel, from N. C. Highway 168 
to the confluence of Light Swamp, 0.8 mile; a 10-footbottom-
width channel, from the confluence of Light 
Swamp to the confluence of a major drainage ditch at 
station 106 + 00, 1.2 miles; on Light Swamp, a 10-foot- 
239

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
bottom-width channel, from the confluence of Moyock 
Creek to station 60+ 00, 1.1 miles; and modification or 
replacement of roadway structures on Mill Run at 
County Roads 1226 and 1216, and on Light Swamp at 
County Road 1227. Estimated project cost (1966) is 
$337,000, including $202,000 Federal cost and non- 
Federal cost of $135,000 ($16,000 cash contribution, 
$60,000 for rights-of-way and legal fees, and $59,000 
for auxiliary drainage works.) The project was 
approved by the Chief of Engineers on September 16, 
1968, under Section 205 of the 1948 Flood Control Act, 
as amended. 
Local cooperation. Local interests must provide all 
lands, easements, rights-of-way, utility relocations and 
alterations, and highway or bridge construction and 
alterations necessary; hold and save the United States 
free from damages and adjust all claims concerning 
water-rights; maintain and operate the project; 
prevent future encroachment and contribute, in cash, 
7.1 percent of channel construction cost; accomplish 
auxiliary drainage works necessary to realize the 
benefits from the proposed Federal improvement; and 
encourage landowners to adopt land-treatment measures 
to minimize siltation of the channels. 
Operations and results during fiscal year. Detailed 
preconstruction planning cost $10,537 for new work. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. 
38. NEUSE RIVER BASIN, N.C. 
Location. Works covered by this project consist of a 
series of dams and reservoirs in the Neuse River Basin 
in North Carolina within a radius of 50 miles from 
Raleigh, North Carolina. (See Geological Survey Map 
of North Carolina.) 
Existing project. The Flood Control Act of 1965 
authroized construction of the Falls project as the key 
project in the recommended general plan of development 
of the Neuse River Basin. The plan will 
serve as a guide for immediate and future development 
of the basin's water resources as set forth in House 
Document 175, 89th Congress, 1st session. A list of 
projects included in the general plan of development 
follows. Estimated costs as given are based on 1963 
price levels, except for Falls Lake which was revised in 
1970. (See Table 6-G on dams and reservoirs.) 
38A. FALLS LAKE, N. C. 
Location. The project is on the Neuse River, about 10 
miles north of the city of Raleigh, North Carolina. 
Existing project. The authorized project provides for 
an earth dam 1,950 feet long with a maximum height 
of 92 feet above streambed. The dam will have a 30- 
foot top width. An uncontrolled chute spillway, 100- 
feet wide, will be located in the east abutment. The 
reservoir will have a gross storage capacity of 397,000 
acre-feet, of which 243,000 acre-feet will be for flood 
control, 45,000 acre-feet for water supply for the city of 
Raleigh, 71,000 acre-feet for water-quality control, and 
38,000 acre-feet for sediment storage. The reservoir will 
be operated as the initial unit of a coordinated system 
for control of floods in the Neuse River Basin for watersupply, 
water-quality control, recreation, and other 
purposes. Project items may be modified in detailed 
preconstruction planning. Estimated cost of new work 
is $40,600,000 (1970), consisting of $13,800,000 for 
construction (including $3,585,000 presently allocated 
to water supply and $2,432,000 for recreation and fish 
and wildlife enhancement to be paid for in the future 
by local interests) and $26,800,000 for lands and 
damages, including highway, railroad, and utility 
relocations. The project was authorized by the 1965 
Flood Control Act (H. D. 175, 89th Cong., 1st sess.) 
Local cooperation. Local interests must prevent 
encroachment on downstream channels that would 
interfere with the operation of the reservoir; pay the 
United States, in accordance with the Water Supply 
Act of 1958, as amended, the entire amount of 
construction cost allocated to water supply, presently 
estimated at $3,585,000, and entire amount of 
operation, maintenance, and replacement costs allocated 
to water supply, presently estimated at $35,000 
annually, the final amounts to be determined after 
actual costs are known; administer project land and 
water areas for recreation and fish and wildlife 
enhancement; pay, contribute in kind, or repay (which 
may be through user fees) with interest one-half of the 
separable cost of the project allocated to recreation and 
fish and wildlife enhancement, the amount involved 
currently being estimated at $2,432,000 and, bear all 
costs of operation, maintenance, and replacement of 
recreation and fish and wildlife lands and facilities, the 
amount involved currently being estimated at $313,000 
on an average annual basis. Formal assurances have 
been requested. The N.C. Department of Water and 
Air Resources has been authorized by an act of 
legislation to assure payment of all non-Federal costs 
allocable to water supply in all Federal projects as 
required by law. The State will require repayment of 
water supply costs, by the users. The State of North 
Carolina was furnished a draft of a recreation contract 
on 8 December 1969. Final approval by the State is 
expected in FY 71. 
Operations and results during fiscal year. Wilmington 
District has overall responsibility for the project, with 
Savannah District serving as planning design agent. 
Wilmington District retains the responsibility for 
reservoir mapping, master and recreation planning, 
reservoir clearing and mosquito control, and highway 
and utility relocations. Preparation of design memoranda 
for the preliminary master plan is 75 percent 
complete; N. C. Highway 98 relocation, 98 percent; N. 
C. Highway 50 and Secondaries relocation, 40 percent; 
railroad relocation, 40 percent; utilities relocation, 30 
percent; and clearing 40 percent. Revisions to the 
general design memorandum are complete. Prep- 
240

WILMINGTON. N.C.. DISTRICT 
aration of plans and specifications for access roads is 
about 3 percent complete. Engineering and design 
studies cost $53,434. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. 
39. NEW RIVER, ONSLOW COUNTY, N. C. 
Location. New River rises near Richlands in 
northwestern Onslow County, N. C., and flows 53 miles 
southerly into Onslow Bay through New River Inlet. 
(See Army Map Service quadrangle sheets, Richlands 
and Jacksonville, N. C., and U. S. Geological Survey 
Map of North Carolina.) 
Existing project. The project consists of 0.2 miles of 
channel restoration below Ware Landing; excavating 
1.3 miles of new channel above Ware Landing with a 
50-foot bottom width; enlarging the next 9.1 miles of 
existing channel up to Mill Swamp to a 50-foot bottom 
width; enlarging the existing channel to a 30-foot 
bottom width from Mill Swamp to County Road 1231, 
about 5 miles; and enlarging the existing channel to a 
20-foot bottom width from County Road 1231 up to N. 
C. Highway 24, about 3.5 miles; a total of 19.1 miles. 
Channel depths range from 7.5 to 10 feet. Estimated 
Federal cost of construction is $563,000 (1968). The 
project was approved by the Chief of Engineers on 
December 13, 1966, under Section 205 of the 1948 
Flood Control Act, as amended. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New work: 
Between July 1, 1969 and June 30, 1970, the contractor 
cleared and excavated 11 miles of the channel in 
Onslow County, N. C., at a cost of $173,427. 
Condition at end of fiscal year. Construction is 
approximately 99 percent complete. The project is 
scheduled for completion in July 1970. 
40. OCRACOKE ISLAND, N. C. 
Location. The project is located on Ocracoke Island, a 
portion of the Outer Banks on the southeast coast of 
North Carolina, separating Pamlico Sound from the 
Atlantic Ocean. (See U. S. Coast and Geodetic Survey 
Chart 1232.) 
Existing project. The project provides for: (a) 
Protection of the ocean frontage from hurricane and 
erosion damage, a beach fill with a berm 50 feet wide at 
an elevation of 7 feet above mean sea level in front of a 
dike with a top width of 25 feet at an elevation of 11 feet 
above mean sea level, a feeder beach near the north 
end of the island, periodic nourishment for an initial 
period of 10 years, sand fences, and vegetation; and (b) 
restoration and stabilization of the Ocracoke Village 
frontage, beach fill to provide a berm with top 
elevation equal to that of the existing bank, but not 
exceeding 7 feet above mean sea level, vegetation and 
drainage facilities, and periodic nourishment for an 
initial period of 10 years. Estimated total project cost is 
$4,320,000 (1970), including Federal cost of $3,915,000 
and non-Federal cost of $405,000 ($339,000 cash 
contribution and $66,000 lands and damages). The 
project was authorized by the Flood Control Act of 
1965 (H. D. 109, 89th Cong., 1st sess.) 
Local cooperation. Local interests must contribute the 
initial costs of protecting the privately owned portions 
of sound shore of Ocracoke Village; contribute 7.2 
percent of the initial costs of the hurricane-protection 
features and the present worth of future maintenance 
thereof; provide all non-Federal lands, easements, and 
rights-of-way, including borrow areas, necessary for 
construction of the projects; accomplish all relocations 
and alterations of sewerage and drainage facilities, 
buildings, streets, utilities, and other structures made 
necessary by construction; contribute the portion of 
periodic nourishment and maintenance costs for the 
privately owned sound shore of Ocracoke Village; hold 
and save the United States free from claims for 
damages due to construction, nourishment, or maintenance 
of the projects, including the laying of dredge 
pipelines across the highways or across private 
property; and at least annually inform interests 
affected that the project will not prevent inundation or 
provide any substantial protection from ocean surges 
higher in elevation than those of the hurricane of 
September 14, 1944. Formal request has not been 
made. 
Operations and results during fiscal year. New work: 
Detailed engineering and design cost, $8,138. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. 
41. PUNGO CREEK, N. C. 
Location. Pungo Creek is in Beaufort County, North 
Carolina. It flows from its source in the J & W Dismal 
Swamp, 3 miles south of Martin-Beaufort County line, 
south and southeast to its confluence with Pungo River, 
a distance of about 10.7 miles. (See U. S. Geological 
Survey quadrangle sheets, Pinetown and Pantego, N. 
C.)
Existing project. The project consists of excavating a 
channel, 30 feet wide, with depths ranging from 8 to 13 
feet, along Pungo Creek from bridge at Route 264 to its 
confluence with Fork Swamp, 10.7 miles; and a 
channel, 10 feet wide with depths ranging from 6 to 10 
feet, along Walla Watta Branch from its confluence 
with Pungo Creek to bridge on Secondary Road 1528, 
2.7 miles; a total of 13.4 miles. Estimated project cost is 
$588,000 (1966), including $403,000 Federal cost and 
non-Federal costs of $185,000 ($89,000 cash contribution, 
$59,000 lands, and $37,000 auxiliary 
drainage). The project was approved by the Chief of 
Engineers on December 5, 1966, under section 205, of 
the 1948 Flood Control Act, as amended. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Between July 1, 
1969 and June 30, 1970, the contractor cleared and 
241

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
excavated 14 miles of channel in Beaufort County, N. 
C., at a cost of $270,293. 
Condition at end of fiscal year. Construction is 
approximately 79 percent complete. The project is 
scheduled for completion in August 1970. 
42. ROCKFISH CREEK, N. C. 
Location. Rockfish Creek is in Sampson, Duplin, and 
Pender Counties, North Carolina. It rises about 4 miles 
north of the Concord community and flows southeast 
for 15 miles to Doctors Creek; then to the east, 13 miles, 
to its confluence with Northeast (Cape Fear) River. 
(See Geological Survey quadrangle sheets, Atkinson, 
Rose Hill, and Burgaw, N. C.) 
Existing project. The project consists of 5.7 miles of 
clearing and snagging from the mouth of Rockfish 
Creek to U. S. 117, thence excavating and straightening 
13.9 miles of channel along Rockfish Creek, with 
bottom widths varying from 40 to 25 feet; on Doctors 
Creek, a tributary of Rockfish Creek, widening, 
deepening, and straightening 6.9 miles of channel, with 
bottom widths varying from 25 to 15 feet, a total of 26.5 
miles; and construction of a 20-acre shallow-water 
wildlife-mitigation reservoir on Doctors Creek about 1 
mile downstream of N. C. 41, and a 25-acre fisherymitigation 
reservoir in the headwaters of Rockfish 
Creek. Estimated project cost (1966) is $621,500, 
including Federal cost of $430,300 and non-Federal 
costs of $191,200 ($82,600, cash contribution; $60,100, 
rights-of-way, legal fees, and drainage district 
formulation; and $48,500, associated works.) The 
project was approved on August 17, 1967, under 
Section 205 of the 1948 Flood Control Act, aS 
amended. 
Local cooperation. Local interest must: provide all 
lands, easements, rights-of-way, utility relocation and 
alterations, and highway or highway-bridge construction 
and alterations necessary for project 
construction; hold and save the United States free from 
damages; maintain and operate the project after 
completion; prevent future encroachment which might 
interfere with proper functioning of the project; 
contribute, in cash, 16.1 percent of construction costs; 
and accomplish associated drainage works necessary to 
realize the benefits from the Federal improvement. 
Local interests have indicated they are willing and able 
to meet these requirements. 
Operations and results during fiscal year. New work: 
Detailed engineering and design cost $6,346. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. 
43. SIX RUNS CREEK, SAMPSON 
COUNTY, N. C. 
Location. Six Runs Creek is in Sampson and Duplin 
Counties, North Carolina. It flows generally southward 
for about 34 miles from its source about 13 miles north 
of Clinton. (See Geological Survey quadrangle sheets, 
Rose Hill and Garland, N. C.) 
Existing project. The project consists of excavating a 
channel, 45 feet wide, in Six Runs Creek from U. S. 
Highway 421 to its confluence with Stewarts Creek, 3.8 
miles; excavating a channel, 35 feet wide, in Six Runs 
Creek upstream to N. C. Highway 24, 7.1 miles, a total 
of 10.9 miles; clearing and snagging Six Runs Creek 
from its mouth upstream to Federal Highway 421, 10.6 
miles; clearing and snagging Stewarts Creek, a 
tributary of Six Runs Creek, from its mouth upstream 
to the Duplin County line, 4.0 miles; and constructing 
a reservoir on Carroll Branch, a Six Runs tributary, as 
a mitigation measure. Estimated project cost (1966) is 
$400,000, including Federal cost of $277,000 and non- 
Federal costs of $123,000 ($27,000, cash contribution; 
$49,000 rights-of-way, legal fees, and drainage district 
formation; and $47,000, auxiliary drainage works). 
The project was approved by the Chief of Engineers on 
March 27, 1968, under Section 205 of the 1948 Flood 
Control Act, as amended. 
Local cooperation. Local interests must provide all 
lands, easements, rights-of-way, utility relocations and 
alterations, and highway or highway-bridge construction 
and alterations necessary; hold and save the 
United States free from damages, and adjust all claims 
concerning water rights; maintain and operate the 
project; contribute, in cash, 8.8 percent of the 
construction costs; prevent future encroachment; 
accomplish the associated drainage works necessary to 
realize the benefits from the Federal improvement; and 
encourage landowners to adopt land-treatment programs 
to minimize siltation of the channel and 
reservoir. Formal request has been made. 
Operations and results during fiscal year. New work: 
Detailed engineering and design cost $284. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. 
44. SOUTH CREEK, N. C. 
Location. South Creek rises in Beaufort County, N. C., 
flows generally north-northeast about 14 miles, and 
empties into Pamlico River about 12 miles above its 
mouth. (See Army Map Service quadrangle sheet, 
Aurora, N. C., and Coast and Geodetic Survey Chart 
No. 537.) 
Existing project. The project consists of excavating a 
channel, 40 feet wide, with depths ranging from 8 to 14 
feet, along South Creek from its confluence with 
Broomfield Creek to its confluence with Cypress Run, 
2.2 miles; excavating a channel, 12 feet wide, with 
depths ranging from 8 to 13 feet, along Broomfield 
Creek from its mouth to West Road, 2.6 miles; 
excavating a channel, 18 feet wide with depths ranging 
from 7 to 8 feet, along Cypress Run from its mouth to a 
point 1,900 feet upstream from Bonner Road Bridge, 
1.5 miles; and excavating a channel, 14 feet wide with 
depths ranging from 7.5 to 8 feet, along upper South 
242

WILMINGTON, N.C., DISTRICT 
Creek from its confluence with Cypress Run to the 
confluence with a drainage canal, 0.7 mile; and 
shaping and seeding 60 acres of spoil area for wildlife 
food and cover. The project was approved by the Chief 
of Engineers on March 9, 1966, under Section 205 of 
the 1948 Flood Control Act, as amended. 
Local cooperation. Fully complied with to date. 
Operations and results during fiscal year. The project was 
transferred to local interest. 
Condition at end of fiscal year. The project was 
completed in June 1969, and has been transferred to 
local sponsor for operation and maintenance. 
45. SWEETWATER CREEK, N. C. 
Location. Sweetwater Creek lies mostly in Martin 
County, N. C., with the uppermost portion of the basin 
extending into Beaufort County, North Carolina. From 
its source which is in the vicinity of the southeastern 
county line of Martin County and the Beaufort County 
line to the confluence with Roanoke River near 
Williamston, N. C., Sweetwater Creek is about 25 miles 
long. (See U. S. Geological Survey quadrangle sheet, 
Williamston, N. C.) 
Existing project. The project consists of excavating a 
50-foot-bottom-width channel from the mouth of 
Sweetwater Creek to Station 36+ 00, 1.5 miles; 
clearing and snagging from Station 36+ 00 to County 
Road 1516, 9.5 miles; excavating a 50-foot-bottomwidth 
channel from County Road 1516 to the 
confluence of Roberson Creek, 6.8 miles; excavating a 
35-foot-bottom-width channel from the confluence of 
Roberson Creek to County Road 1538, 2.4 miles; 
excavating a 35-foot-bottom-width channel on Roberson 
Creek from the confluence of Sweetwater Creek 
to County Road 1538, 3.0 miles; a total of 23.2 miles; 
and constructing wildlife mitigating areas and a boat 
ramp. Estimated total project cost (1967) is $406,000, 
including $290,000 Federal cost and non-Federal cost 
of $116,000 ($43,000, cash contribution, $43,000, 
lands, and $30,000 auxiliary drainage). The project 
was approved by the Chief of Engineers on June 12, 
1969, under Section 205 of the 1948 Flood Control Act, 
as amended. 
Local cooperation. Local interests must provide lands, 
easements, rights-of-way, utility relocations and 
alterations, and highway or highway-bridge construction 
and alterations necessary for project 
construction; hold and save the United States free from 
damages; maintain and operate the project after 
completion; prevent future encroachment; contribute, 
in cash, 13.0 percent of the channel construction cost; 
provide for free public access to the fishery-mitigation 
boat-launching ramp and parking area; accomplish 
associated drainage works necessary to realize the 
benefits from the Federal improvement; and encourage 
individual landowners to adopt land-use and treatment 
measures to minimize the deposition of spoil in the 
channels. Formal request has not been made. 
Operations and results during fiscalyear. Engineering and 
design studies cost $1,798 for new work. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. 
46. THOROUGHFARE SWAMP, N. C. 
Location. Thoroughfare Swamp rises near the Wayne 
County-Sampson County line and flows eastward 
about 10 miles to its confluence with Buck and Yellow 
Swamps, turns northward and flows about 8.5 miles to 
its confluence with Neuse River. (See U. S. Geological 
Survey quadrangle sheet Raleigh, N. C.) 
Existing project. The project consists of channel 
improvement and dam construction in the Thoroughfare 
Swamp Basin; clearing and snagging 1.2 
miles of channel; excavating a 20-foot-bottom-width 
channel on Thoroughfare Swamp, 2.5 miles; excavating 
a 10-foot-bottom-width channel on Thoroughfare 
Swamp, 7.3 miles; excavating a 10-footbottom-
width channel, from the mouth of Beaverdam 
Creek, 9.2 miles; excavating an 8-foot-bottom-channel 
from the mouth of Thunder Swamp to N. C. Highway 
55, a distance of 3.1 miles; construction a multipurpose 
reservoir on Beaverdam Creek with pertinent features 
including a parking area and boat ramp for fishery 
mitigation and a 16-acre recreational development. 
Estimated total project cost (1967) is $522,000, 
including $355,000 Federal cost and non-Federal cost 
of $167,000 ($92,650 cash contribution, $56,900 lands, 
and $17,400 auxiliary drainage). The project was 
approved by the Chief of Engineers on April 1, 1969, 
under Section 205 of the 1948 Flood Control Act, as 
amended. 
Local cooperation. Local interests must provide lands, 
easements, rights-of-way, utility relocations and 
alterations; hold and save the United States free from 
damages due to construction works; maintain and 
operate the project after completion; contribute, in 
cash, 14.8 percent of the construction cost of the flood 
control and drainage improvements; contribute 50 
percent of the separable costs of recreation, including a 
cash contribution; administer lands and water areas for 
recreation; prevent future encroachment; accomplish 
auxiliary drainage work necessary to realize benefits 
from the Federal improvement; and encourage 
individual landowners to apply land-treatment measures 
to lands within the basin to minimize soil erosion 
and subsequent silt deposition in the improved 
channels. Formal request has not been made. 
Operations and results during fiscalyear. Engineering and 
design studies cost $29,646 for new work. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. 
47. TRANTERS CREEK, N. C. 
Location. Tranters Creek rises a few miles northeast of 
Parmele, N. C., flows generally southeast about 33 
243

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
miles, and enters Pamlico-Tar River just above 
Washington, North Carolina. (See Geological Survey 
Map of North Carolina.) 
Existing project. The project provides for improving 
Tranters Creek by snagging from its mouth upstream 
to the confluence with Aggies Run; thence clearing and 
snagging to a point 10.9 miles above; thence excavating 
a 50-foot-wide channel to a point about 3.5 miles 
above; thence excavating a 40-foot-wide channel about 
1.8 miles (intersection of Beargrass Swamp); and 
thence excavating a 30-foot-wide channel about 4.6 
miles to the intersection of Flat Swamp Channel; 
improving Aggies Run, a tributary of Tranters Creek, 
by excavating a 45-foot-wide channel from its mouth 
upstream about 7.1 miles (U. S. Highway 17); thence 
excavating a 35-foot-wide channel about 2.7 miles to 
County Road 1442; and constructing a reservoir and 
wildlife areas to mitigate fish and wildlife damages. 
Estimated Federal cost for new work (1965) is $614, 
000. The project was approved by the Chief of 
Engineers on September 6, 1967, under section 205 of 
the 1948 Flood Control Act, as amended. 
Local cooperation. Local interests must: provide all 
lands, easements, rights-of-way, utility relocations and 
alterations, and highway or highway-bridge construction 
and alterations necessary for project 
construction; hold and save the United States free from 
damages due to the construction works, and adjust all 
claims concerning water rights; maintain and operate 
the project after completion; prevent future encroachment 
which might interfere with proper 
functioning of the project; contribute, in cash, 21.4 
percent of the construction costs, now estimated at 
$167,500; and accomplish the associated drainage 
works necessary to realize the benefits from the 
proposed Federal improvement. Formal request has 
not been made. 
Operations and results during fiscal year. New work: 
Detailed engineering and design cost $30,464. 
Condition at end of fiscal year. The project is in the 
preconstruction planning stage. 
48. WRIGHTSVILLE BEACH, N. C. 
Location. A small island about 10 miles east of 
Wilmington, N. C. (See Coast and Geodetic Survey 
Map 834.) 
Existing project. Construct a dune with a base 
bordering at or near the building line, with a crown 
width of 25 feet at elevation 15 feet above mean low 
water, together with integral construction of a beach 
berm with a crown width of 50 feet at elevation 12, 
extending about 14,000 feet from Moores Inlet on the 
north to Masonboro Inlet on the south. Estimated cost 
for new work (1969) is $1,440,000. Existing project was 
authorized by 1962 Flood Control Act (H. D. 511, 87th 
Cong., 2d sess.) 
Local cooperation. Fully complied with to date. 
Operations and results during fiscal year. Between March 
16 and May 14, 1970, the contract dredge Pittsburg 
removed 773,561 cubic yards from borrow areas in the 
basin near Old Moores Inlet for emergency restoration 
of berm and dune on the beach at a construction cost of 
$142,888. 
Condition at end of fiscal year. Project complete May 
1970. 
49. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
To determine the extent of compliance with 
approved regulations for maintenance and operation, 
inspections were made of the following projects during 
the fiscal year December 1969: South Creek, Beaufort 
County, N. C.; Pungo River, Beaufort County, N. C.; 
and Filberts Creek, Edenton, N. C.; Pantego and 
Cucklers Creek, Beaufort County, N. C.; White Oak 
Dike, Bladen and Pender Counties, N. C.; Ellerbe 
Creek, Durham County, N. C.; Pasquotank Dike, 
Pasquotank County, N. C.; Perquimans River, 
Perquimans County, N. C.; Core Creek, Craven 
County, N. C.; Swift Creek, Pitt County, N. C.; 
Carolina Beach, New Hanover County, N. C.; 
Wrightsville Beach, New Hanover County, N. C.; 
Goldsboro, Neuse River, Wayne County, N. C. 
Responsible local officials were advised of inadequacies 
in maintenance and operation on local flood protection 
works where appropriate. 
50. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 6-H.) 
51. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 
858, 80th Congress, as amended (preauthorization) 
(See Table 6-I.) 
Emergency flood control activities and hurricane flood and 
shore-protection activities at Federally authorized projects 
(Public Law 99, 84th Congress, and antecedent legislation) 
Federal costs for revision of Flood emergency 
manual were $2,876 for fiscal year. Emergency 
restoration work was done at Carolina Beach, North 
Carolina at a cost of $291,159 and Wrightsville Beach, 
North Carolina at a cost of $202,412. 
MULTI-PURPOSE PROJECTS INCLUDING 
POWER 
52. ROANOKE RIVER BASIN, VA. AND 
N. C. 
Location. The project is on the Roanoke River and its 
tributaries in Virginia and North Carolina within a 
radius of 100 miles from Danville, Virginia. 
244

WILMINGTON, N.C., DISTRICT 
Existing project. The Flood Control Act of 1944 
approved a general plan for the comprehensive 
development of the Roanoke River Basin for flood 
control and other purposes, and authorized construction 
of John H. Kerr and Philpott Reservoirs. See 
Table 6-G for a list of dams and reservoirs included in 
the comprehensive plan. 
Local cooperation. None required. John H. Kerr and 
Philpott Reservoirs are the only projects in the 
comprehensive plan that have been authorized for 
construction. (See Table 6-G on dams and reservoirs.) 
52A. JOHN H. KERR DAM AND 
RESERVOIR, VA. AND N. C. 
Location. The project is on the Roanoke River, about 
178.7 river miles above its mouth, in Mecklenburg 
County, Virginia, and 20.3 miles downstream from 
Clarksville, Virginia. The reservoir extends upstream 
on Roanoke River 56 miles and on Dan River 34 miles. 
Existing project. The authorized project provides for a 
concrete gravity dam with wing and saddle dikes on the 
right and left banks, with a total length of about 22,285 
feet. The reservoir is operated as a unit of a coordinated 
system of reservoirs in the Roanoke River Basin for 
control of floods, generation of hydroelectric power, 
regulation of low-water flow, and for other purposes. 
The power installation is 204,000 kilowatts. (For 
further details see Annual Report for 1962.) Estimated 
cost (1970) is $63,595,000 and $24,521,000 for lands 
and damages, including relocation of highways, 
railroads, and utilities, a total of $88,116,000 for new 
work. The existing project was authorized by the 1944 
Flood Control Act. 
Local cooperation. None required. 
Operations and results during fiscal year. New work: 
Expansion and improvement of recreational facilities 
by hired labor and contract, consisting of access roads 
and parking areas, boat launching ramps, picnic and 
sanitary facilities, campsite preparation, and miscellaneous 
improvements continued under the Construction, 
General, program. Contract work included 
one comfort station with flush toilets, one utility and 
shower building, and road construction and paving. 
Maintenance: General operation and maintenance of 
the project was performed. 
Condition at end offiscalyear. Project is complete except 
for additional recreational facilities, resolution of 
claims against the Government, and judgments in real 
estate condemnation cases. Production of power and 
protection from floods are provided by project. 
52B. PHILPOTT LAKE, VA. 
Location. On Smith River, Viriginia, 44.3 miles above 
its junction with Dan River, and 35 miles upstream 
from Virginia-North Carolina State line in Franklin 
and Henry Counties. 
Existing project. The authorized project provides for a 
concrete gravity dam 892 feet long and with a 
maximum height of 220 feet. Reservoir is operated as a 
unit of a coordinated reservoir system for flood control 
in the Roanoke River Basin, generation of hydroelectric 
power, regulation of low-water flow, and for 
other purposes. The powerhouse has a total installation 
of 14,000 kilowatts. (For further details see Annual 
Report for 1962.) Federal cost estimate (1970) is $13, 
050,000 for construction and $1,157,000 for lands and 
damages, a total of $14,207,000. Existing project was 
authorized by 1944 Flood Control Act. 
Local cooperation. None required. 
Operations and results during fiscal year. New work: 
Expansion and improvement of recreational facilities 
by hired labor, consisting of one comfort station with 
flush toilets (Bowens Creek), campsite preparation, 
and miscellaneous improvements continued under the 
Construction, General, program. Maintenance: General 
operation and maintenance of project was 
performed. 
Condition at end of fiscal year. The project is complete 
except for additional recreational facilities, and is 
providing power and flood protection. 
53. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
John H. Kerr and Philpott Reservoir projects, 
Roanoke River Basin, Va. and N. C., began the fiscal 
year with John H. Kerr Reservoir one foot above the 
rule curve and Philpott Reservoir less than a foot below 
the rule curve. Kerr remained within one foot of rule 
curve for the remainder of the recreation season being 
above most of the time. The reservoir remained near 
rule curve the remainder of the year but for relatively 
short periods getting as much as three feet above or 
below. It reached a maximum elevation of 303.25 on 19 
April and was at elevation 299.9 on 30 June. Philpott 
filled to rule curve on 7 July and remained on or above 
the rule curve the remainder of the year being at 
elevation 973.5 on 30 June. 
A minimum stage of near 13 feet was provided at 
Weldon, N. C., during the striped bass spawning season 
for a total of 43 days. All inflows to the reservoirs were 
controlled with normal power operation without 
having to spill water or sell dump energy during flood 
control periods. Total cost of functional operation for 
the fiscal year was $90,411 for John H. Kerr and $18, 
182 for Philpott. 
GENERAL INVESTIGATIONS 
54. SURVEYS 
Fiscal year cost was $294,178, on which $63,721 was 
for navigation studies; $219,030 was for flood control 
studies; $6,977 for beach erosion studies; and $4,449 for 
National shoreline study. 
245

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
55. COLLECTION AND STUDY OF BASIC 
DATA 
Flood plain information studies, as authorized by 
Section 206, 1960 Flood Control Act, as amended, 
comprise compilation and dissemination, upon the 
request of a State or a political subdivision thereof, of 
information on floods and flood damages, including 
identification of areas subject to inundation by floods of 
various magnitudes and frequencies, and general 
criteria for guidance of Federal and non-Federal 
interests and agencies in the use of flood-plain areas; 
and provide advice to other Federal agencies and local 
interests for their use in planning to ameliorate the 
flood hazard. Total costs for the the fiscal year were 
$126,744. Total costs to 30 June 1970, were $480,387. 
(See Table 6-J for completed flood-plain studies.) 
246

WILMINGTON, N.C., DISTRICT 
TABLE 6-A COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
1. Aauatic Plant New Work: 
Control (R&H Act of 
1965) 
(Regular Funds) 
(Contributed Funds) 
2. Atlantic Intracoastal 
Waterway 
between Norfolk, Va. 
& St. Johns River, 
Fla. 
(Regular Funds) 
3. Avon Harbor, N.C. 
4. Beaufort Harbor, 
N.C. 
5. Cape Fear River, 
N.C. above 
Wilmington 
6. Channel from Back 
Sound to Lookout 
Bight, N.C. 
7. Drum Inlet, N.C. 
8. Lockwoods Folly 
River, N.C. 
9. Manteo (Shallowbag) 
Bay, N.C. 
10. Morehead City 
Harbor, N.C. 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
$ 2,000 $ 6,000 $ 13,000 $ 14,000 
736 6,067 10,584 11,062 
3,479 
1,511 
-21,502 
4,000 
524 
40,000 
126,525 
4,000 
2,633 
711,500 687,456 1,041,120 1,279,614 
639,214 623,461 670,617 1,791,976 
-4 
11,312 
11,312 
50,000 
50,050 
43,900 
4,340 
185,200 
161,647 
18,500 
20,068 
24,465 
804 
73,000 
72,341 
407,135 585,000 
47,841 307,150 
153,700 178,100 
191,936 182,263 
33,614 
33,614 
-740 
19,500 
39,186 
1,000 
2,190 
1,962 
1,962 
1,500 
406 
11,400 
11,561 
2,300 
23,299 
32,293 
33,265 
351,000 
577,241 
166,539 
173,543 
49,490 
49,490 
3,0007 
3,7528 
35,741 
36,075 
233,400 383,826 491,327 521,667 
259,400 322,539 458,335 615,185 
$ 35,000 
28,449 
11,479 
4,668 
11,624,6411 
11,624,641l 
16,544,2332 
16,543,8572 
74,096 
74,096
3 
80,418 
77,756 
598,3894 
598,389 
884,8604 
884,8604 
4,136,1655 
3,678,6025 
4,972,1026 
4,972,0156 
88,328 
88,328 
441,847 
441,847 
57,328 
56,986 
154,535 
154,535 
49,749 
49,749 
116,791 
116,791 
1,386,335 
1,386,335 
3,411,637 
3,401,462 
1,633,8799 
1,633,879 
247

REPORT OF THE CHIEF OF' ENGINEERS, U.S. ARMY 1970 
TABLE 6-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
11. Neuse River, N.C. 
12. Ocracoke Inlet, 
N.C. 
13. Rollinson Channel, 
N.C. 
14. Silver Lake Harbor, 
N.C. 
15. Waterway connecting 
Pamlico Sound and 
Bearfort Harbor, 
N.C. 
(Regular Funds) 
(Contributed Funds) 
16. Wilmington Harbor, 
N.C. 
20. Fort Macon State 
Park, N.C. 
22. Black River, N.C. 
23. Broad Creek, N.C. 
24. Brunswick County 
Beaches, Cape Fear 
River to N.C.-S.C. 
Line 
(Contributed Funds) 
25A. New Hope Lake, N.C. 
(Contributed Funds) 
Funding 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
Total to 
FY 67 FY 68 FY 69 FY 70 June 30, 1970 
$ 574,789 
525,122 
215,000 
207,744 
44,000 
43,702 
- 
5,0001 
5,19415 
865,000 
1,196,990 
231,800 
228,981 
208,000 
208,811 
45,73914 
45,73915 
11,000 
2,08918 
$ 462,866 
510,375 
19,000 
-10,805 
21,000 
22,362 
1841s 
28,325 
28,325 
2,486,983 
1,897,310 
299,321 
302,704 
8,000 
$ 402,000 
405,582 
4,500 
2,58412 
5,623 
50,000 
1,560 
107,000 
7,044 
48,500 
44,978 
37,600 
6,264 
1,048,000 
976,170 
353,278 
298,909 
250,000 
1,602 
617 
155,000 
24,375 
$ 649,682 
644,435 
1,11813 
318,000 
89,887 
-5,231 
43,209 
-30,000 
52,219 
91,187 
5,675 
43,135 
42,561 
2,972 
2,972 
2,000 
2,000 
1,265,000 
2,424,498 
451,610 
527,536 
215,343 
6,000 
12,472 
-149,000 
1,523 
100,000 
5,732 
2,194,000 1,790,000 2,074,000 1,520,000 
1,036,031 2,837,337 1,674,270 2,132,513 
- - - 100,000 
- - - 25,761 
$ 7,927,15410 
7,921,15410 
452,148 
451,350 
295,531 
295,531 
346,240 
104,750 
589,105 
589,105 
238,146 
238,146 
144,241 
126,504 
354,288 
264,988 
312,522 
278,658 
417,339 
417,339 
2,000 
2,000 
17,392,40916 
17,171,351 
14,053,58017 
14,053,580 
512,000 
475,396 
5.9,739 
58,828 
76,000 
75,968 
100,000 
5,732 
8,623,000 
8,579,306 
100,000 
25,761 
248

TABLE 6-A (Continued) 
See 
Section 
in Text Project 
25B. Randleman Lake, 
N.C. 
26. Carolina Beach and 
Vicinity, N.C. 
(Regular Funds) 
(Contributed Funds) 
27. Conoho Creek, N.C. 
28. Ellis Swamp, N.C. 
(Contributed Funds) 
29. Filbert's Creek, 
N.C. 
30. Gardners Creek, 
N.C. 
(Regular Funds) 
(Contributed Funds) 
31. Hominy Swamp, N.C. 
32. Joyce Creek, N.C. 
33. Lick Run, Roanoke, 
Va. 
(Contributed Funds) 
34. Mackay Creek, N.C. 
35. Mill Creek, N.C. 
36. Moccasin Swamp, 
N.C. 
37. Moyock Creek, N.C. 
38A. Falls Lake, N.C. 
39. New River, N.C. 
WILMINGTON, N.C., DISTRICT 
COST AND FINANCIAL STATEMENT 
Total to 
Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
139,400 
136,239 
50,000 
71,243 
-65514 
29,69015 
6,258 
5,000 
2,025 
33,130 
1,525 
- 
35,00014 
22,38115 
-4,500 
8,748 
1,383 
4,400 
7,730 
71514 
18,05815 
4,50014 
3,8001s 
3,20014 
12,85815 
360,000 
285,775 
24,000 
18,143 
25,000 
74,563 
12,219 
1,92515 
8,000 
7,115 
37,000 
4,913 
2,623 
- 
2,00014 
14,53415 
17,000 
9,147 
31,000 
27,029 
18,000 
17,519 
2715 
35,000 14 
23,0391s 
14,80014 
1,712 15 
225,000 
287,800 
577,600 
26,976 
$ 2,500 
2,025 
6,000 
22,348 3,225 
50014 
34515 
88,800 
10,096 
25,350 
1,051 
9,300 
17,500 
20,231 
6,468 
909,500 
34,272 
-1,000 
3,002 
60,000 
21,852 
8,07815 
10,296 
14,89820 
55,000 
43,068 
-30,000 
273,396 
$ 2,500 
2,025 
867,968 
863,663 
469,768 
463,652 
77,345 
62,551 
118,300 
98,741 
28,500 
23,282 
32,288 
32,288 
46,442 
40,556 
11,826 
10,867 
73,093 
69,527 
53,150 
51,913 
456,999 
109,570 
285,000 
98,500 
80,902 
112,215 
88,859 
39,500 
36,677 
60,564 
60,182 
742,300 
740,382 
620,250 
540,127 
249 
38,000 
23,631 
60,891 
28,500 
23,282 
-9,712 
8,312 
34,009 
2,526 
10,867 
13,093 
10,829 
656 
-543,000 
10,224 
285,000 
20,000 
5,746 
15,465 
1,76019 
990 
10,537 
2,300 
53,434 
173,427

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 6-A (Continued) 
See 
Section 
in Text Project 
40. Ocracoke Island, 
N.C. 
41. Pungo Creek, N.C. 
(Regular Funds) 
(Contributed Funds) 
42. Rockfish Creek, 
N.C. 
43. Six Runs Creek, 
N.C. 
44. South Creek, N.C. 
(Regular Funds) 
(Contributed Funds) 
45. Sweetwater Creek, 
N.C. 
46. Thoroughfare Swamp, 
N.C. 
47. Tranters Creek, N.C. 
48. Wrightsville Beach, 
N.C. 
(Regular Funds) 
(Contributed Funds) 
52A. Roanoke River Basin, 
Va., and N.C., John 
H. Kerr Dam and 
Reservoir 
52B. Roanoke River 
Basin, Va., and 
N.C., Philpott 
Lake, Va. 
COST AND FINANCIAL STATEMENT 
Total to 
FY 67 FY 68 FY 69 FY 70 June 30, 1970 
115,000 
24,150 
8,000 
22,623 
-4,500 
7,730 
-4,500 
1,743 
11,100 
15,608 
-5,600 
53,891 
432,000 
6,143 
40,000 
27,479 
20,000 
13,918 
170,600 
1,435 
17,500 
Funding 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
12,397 
5,925 
111,000 
120,399 
830,500 
997,359 
29,000 
52,831 
276,700 
279,087 
20,093 
20,000 
3,112 
93,000 
11,800 
18,500 
4,026 
-19,800 
127,634 
15,262 
697 
Is 
5,50022 
47115 
25,000 
28,510 
92,500 255,00023 
143,774 83,54424 
872,700 1,017,600 
1,054,329 987,819 
60,032 38,000 
11,075 86,540 
303,200 319,300 
346,985 311,426 
8,138 
270,293 
59,390 
5,579 
6,346 
284 
-22,369 
-1,851 
2,23821 
35,000 
1,798 
50,500 
29,646 
70,000 
30,464 
142,500 
142,888 
66,500 
59,770 
98,000 
260,297 
1,128,776 
1,055,113 
25,000 
25,655 
412,478 
422,862 
109,400 
106,272 
524,700 
346,089 
93,000 
59,390 
92,047 
92,018 
85,525 
64,977 
180,506 
176,866 
17,500 
17,500 
77,600 
44,398 
107,525 
80,644 
176,350 
112,837 
719,500 
719,500 
348,500 
338,721 
87,397,827 
87,388,668 
11,963,844 
11,843,097 
13,754,484 
13,754,474 
4,126,340 
4,115,023 
1. Includes $198,707 for previous projects. 
2. Includes $107,634 for previous projects. 
3. Includes $25,000 for previous projects. 
4. Includes $12,854 for previous projects. 
5. Includes $149,119 for previous projects. 
6. Includes $8,178 for previous projects. 
7. Preauthorization funds to modify existing project. 
8. Preauthorization costs to modify existing project. 
9. Includes $44,484 for previous projects. 
10. Includes $284,557 for previous projects. 
11. Preauthorization study funds, $2,514; preconstruction 
planning funds, $1,986. 
12. Preauthorization study costs, $2,500; preconstruction 
planning costs, $84. 
13. Preauthorization study costs, $14; preconstruction planning 
costs $1,104. 
14. Preauthorization study funds. 
15. Preauthorization study costs. 
16. Includes $4,625,614 for new work on previous projects. 
17. Includes $602,614 for previous projects. 
18. Includes preauthorization study costs of $434 and preconstruction 
planning costs of $1,655. 
19. Includes $1,486 preauthorization study costs and $274 
preconstruction planning costs. 
20. Includes $298 preauthorization study costs and $14,600 
preconstruction planning costs. 
21. Represents refund. 
22. Includes preauthorization study funds; FY 67, $2,000; 
FY 68, $873; and preconstruction planning funds: FY 68, $627; 
FY 69, $5,500. 
23. Includes regular funds, Code 711, $17,000, and Five-Year 
Program funds, Code 712, $238,000. 
24. Includes regular costs, Code 711, $15,839 and Five-Year 
Program costs, Code 712, $67,705. 
250 
11,86615 5,853 15 
2,00022 1,50022 
9,84015s 1,407s5 
- 30,000 
220 5,520

WILMINGTON, N.C., DISTRICT 
AUTHORIZING LEGISLATION 
Work Authorized 
July 25, 1912 
July 25, 1912 
Aug. 8, 1917 
July 18, 1918 
Jan. 21, 1927 
July 3, 1930 
Mar. 4, 19332 
Jun. 26, 19343 
Aug. 26, 1937 
Aug. 26, 1937 
June 20, 1938 
June 20, 1938 
Mar. 2, 1945 
June 30, 1948 
May 17, 1950 
May 17, 1950 
Sept. 3, 1954 
Nov. 29, 1963, 
sec. 107 
July 14, 1960 
Apr. 7, 1966, 
sec. 107 
July 14, 1960 
Nov. 7, 1966 
Nov. 7, 1966 
Mar. 3, 1881 
Mar. 2, 1907 
ATLANTIC INTRACOASTAL WATERWAY BETWEEN NORFOLK, 
VA., AND ST. JOHNS RIVER, FLA. (See Section 2 of text) 
Original route of the Norfolk-Beaufort Inlet section. 
Purchase of canal 
Change in route; following changes approved by Secretary of 
War, Apr. 14, 1919: 
Albemarle Sound-Pamlico Sound section: Changed from 
"Alligator River-Rose Bay route" to "Alligator River- 
Pungo River route." 
Pamlico Sound-Neuse River section: Changed from "Pamlico 
Sound-Brant Shoal Neuse River route" to "Goose Creek-Bay 
River route." 
Alligator River-Pungo River route (proposed land cut 
connecting the rivers): Changed from a straight line to a 
bent line approaching nearer town of Fairfield, N.C. 
A 12-foot channel 90 feet wide from Beaufort to Cape Fear 
River, N.C., including highway bridge and tidal lock. 4 
An 8-foot channel 75 feet wide from Cape Fear River to 
Winyah Bay, S.C. 
Construct a suitable bridge near Fairfield, N.C. 
Operating and care of works of improvement provided for with 
funds from War Department appropriations for rivers and 
harbors. 
Increasing dimensions of waterway to 12 feet deep and 90 feet 
wide. 
A 12-foot side channel 90 feet wide to Swansboro. 
A yacht basin near Southport, 12 feet deep, 230 feet wide, and 
450 feet long, with connecting channel. 
A 6-foot channel 90 feet wide from New River Inlet to Inland 
Waterway. 
Six mooring basins. 
A 12-foot channel in New River. 5 
Vicinity of Fairfield, drainage. 
Masonboro Inlet and connecting channels, including jetties 
at the inlet. 6 
A 12-foot channel and basin in Peltier Creek. 7 
A 6-foot channel 90 feet wide from Intracoastal Waterway 
to Bogue Inlet gorge. 
An 8-foot channel 150 feet wide through New Topsail Inlet, 
thence a 7-foot channel 80 ft. wide to Intracoastal Waterway 
by way of Old Topsail Creek; and a 7-foot channel 80 feet 
wide in Banks Channel from New Topsail Inlet, parelleling 
barrier beach, to Intracoastal Waterway. 
Maintenance of a channel, 6 feet deep, 80 feet wide, and 8,000 
feet long, from the through channel of the waterway to and 
including a basin of the same depth, 130 feet wide and 180 
feet long, at Carolina Beach. 
Maintenance of general navigation features of N.C. State Ports 
Authority Small Boat Harbor at Southport. 
BEAUFORT HARBOR, N.C. (See Section 4 of text) 
A 9-foot channel 200 feet wide through Bulkhead Channel to 
Beaufort; a 6-foot channel 100 feet wide to North River and 
Core Sound; and construct jetties on Shackleford Point. 
Repairs to Fort Macon jetties and additional jetties and shore 
protection. 
251 
TABLE 6-B 
Acts Documents 
H. D. 391, 62d Cong., 2d sess. 
H. D. 589, 62d Cong., 2d sess. 
H. D. 1478, 63d Cong., 3d sess., 
and H. D. 1136, 64th Cong., 1st 
sess. 
Approved by Secretary of War, 
May 15, 1919. 
H. D. 450, 69th Cong., 1st sess. 
H. D. 41, 71st Cong.,lst sess. 
Rivers and Harbors Committee 
Doc. 5, 72d Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 6, 75th Cong., 1st sess. 1 
Rivers and Harbors Committee 
Doc. 16, 75th Cong., 1st sess. l 
H. D. 549, 75th Cong., 3d sess.' 
H. D. 691, 75th Cong., 3d sess.' 
H. D. 660, 76th Cong., 3d sess.' 
H. D. 421, 80th Cong., 1st sess.l 
H. D. 723, 80th Cong., 2d sess. 1 
H. D. 341, 81st Cong., 1st sess.' 
H. D. 379, 81st Cong., 1st sess.' 
Detailed Project Report 
April 1963. 
Detailed Project Report 
July 1965. 
H. D. 515, 89th Cong., 2d sess.' 
H. D. 514, 89th Cong., 2d sess.' 
Annual Report, 1881, p. 1013. 
Specified in act.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 6-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized 
Mar. 3, 1925 
July 3, 1930 
Mar. 2, 1945 
May 17, 1950 
May 21, 1965, 
sec. 107 
July 14, 1960 
July 3, 1930 
Oct. 17, 1940 
Feb. 7, 1967, 
sec. 107 
July 14, 1960 
Rivers and Harbors Committee 
Doc. 8, 68th Cong., 2d sess. l 
H. D. 776, 69th Cong., 2d sess.1 
H. D. 334, 76th Cong., 1st sess. l 
H. D. 111, 81st Cong. 1st sess.l 
Detailed Project Report 
Apr. 1965. 
Rivers and Harbors Committee 
Doc. No. 3, 70th Cong., 1st 
sess. 
H. D. No. 325, 76th Cong., 1st 
sess. 
Detailed Project Report 
July 9, 1965. 
Bulkhead across Bird Shoal. 
Increase in depth to 12 feet in Bulkhead Channel, Gallants 
Channel, and in front of Beaufort. 
Increase in width and length of basin in front of Beaufort, all 
to 12 feet deep. 
Increase in depth to 12 feet and in width to 100 feet in 
Taylors Creek; transfer to Beaufort Harbor project. 
Channels 15 feet deep, 100 feet wide in Bulkhead, Gallants and 
Taylors Creek channels, and through turning basin in front 
of Beaufort; and harbor of refuge in Town Creek, 12 feet 
deep, 400 feet wide, and 900 feet long connected to 
Gallants Channel by channel 12 feet deep, 150 feet wide, and 
1,400 feet long. 
SILVER LAKE HARBOR, N.C. (See Section 14 of text) 
Entrance channel, 5 feet deep and 50 feet wide, from Pamlico 
Sound to the 3-foot contour in the lake, and training wall 
at entrance. 
Channel, 10 feet deep, and anchorage basin of same depth, 
100 feet wide across Big Foot Slough and 60 feet wide in 
entrance. 
Basin depth of 12 feet in Silver Lake Harbor; channels, 12 
feet deep, 150 feet wide, in Teaches Hole and Big Foot 
Slough Channels and across Bluff Shoal; entrance channel, 
same depth, 60 feet wide; and training wall on south side 
of entrance channel. 
WATERWAY CONNECTING PAMLICO SOUND AND BEAUFORT 
HARBOR, N.C. (See Section 15 of text) 
A 7-foot channel 75 feet wide from Pamlico Sound to Beaufort 
Harbor via Wainright Channel. 
A 7-foot side channel 75 feet wide to Atlantic. 
Channels 7 feet deep, 75 feet wide, at east and west ends of 
Harkers Island and side channel 5 feet deep, 75 feet wide, 
with basin 150 by 130 feet, same depth, at Davis. 
A 7-foot side channel 75 feet wide, with basin 200 by 500 feet, 
same depth, at Sealevel. 
A 6-foot side channel 60 feet wide, with basin 100 feet by 
about 600 feet, same depth, at Marshallberg. 
A side channel 7 feet deep, 70 feet wide to local harbor at 
Cedar Island and an access channel 6 feet deep, 60 feet wide 
and about 400 feet long to a basin same depth, 60 by 100 
feet. 
An entrance channel 6 feet deep, 60 feet wide, from Back Sound 
to harbor of refuge 120 by 250 feet, same depth, at west end 
of Harkers Island in Brook Creek. 
A channel 7 feet deep, 70 feet wide, from existing side 
channel at Atlantic to a basin 600 by 180 feet, same depth, 
with a breakwater, between mouth of Little Port Brook and 
White Point. 
1. Contains latest published maps. 
2. Public No. 443, 72d Cong. 
3. Permanent Appropriations Repeal Act. 
4. Tidal lock in land cut between Myrtle Sound and Cape 
Fear River. 
5. A 12- by 90-foot channel in New River from Intracoastal 
Waterway to and including a basin at Jacksonville, N.C. 
6. Jetties on each side of Masonboro Inlet. 
7. A 6- by 50-foot channel provided under section 3, River 
and Harbor Act of March 2, 1945; 12- by 90-foot project 
classified as inactive. 
8. Included in the Public Works Administration program, 
Jan. 3, 1934. 
252 
Documents 
H. D. 485, 72d Cong., 2d sess. l 
Rivers and Harbors Committee 
Doc. 92, 74th Cong., 2d sess. 1 
H. D. 99, 77th Cong., 1st sess. 1 
S. D. 247, 77th Cong., 2d sess. 1 
H. D. 68, 81st Cong., 1st sess. 1 
Detailed Project Report 
Dec. 12, 1968. 
Detailed Project Report 
March 13, 1967. 
Detailed Project Report 
Dec. 21, 1967. 
Aug 30, 19358 
Aug. 26, 1937 
Mar. 2, 1945 
Mar. 2, 1945 
May 17, 1950 
July 11, 1963, 
sec 107 
July 14, 1960 
Sept. 22, 1967, 
sec 107 
July 14, 1960 
Feb. 24, 1969 
sec 107 
July 14, 1960

WILMINGTON, N.C., DISTRICT 
TABLE 6-C 
RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 17 of Text) 
Project Date Survey 
Conducted 
Atlantic Beach Channels, N. C. October 1969 
Cashie River, N. C. May 1970 
Channel connecting Thoroughfare Bay February 1970 
with Cedar Bay 
Channel from Pamlico Sound to October 1969 
Rodanthe 
Edenton Harbor, N. C. May 1970 
Pamlico and Tar Rivers, N. C. February 1970 
Roanoke River, N. C. March 1970 
Smiths Creek, N. C. February 1970 
NAVIGATION WORK UNDER SPECIAL AUTHORIZATION 
TABLE 6-E Navigation Activities Pursuant to Section 107, Public Law 86-645 (Preauthorization) 
(See Section 19 of Text) 
Study Identification FiscalsYear 
Cost 
AIWW-Salter Path 1 $ - 
Belhaven Harbor, N. C. 
Dyke Line Canal, N. C.1 
Hammocks Beach Channel 591 
Lockwoods Folly and Shallotte River Inlets 
Middletown Creek, N. C.1 
Neuse River, N. C. 4,109 
1. Navigation activities pursuant to section 107 were initiated under the District Engineers authority. 
TABLE 6-F OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
Cost to June 30, 1970 
For Last 
Full Report, Operation 
See Annual and 
Project Report for Construction Maintenance 
Cape Lookout, N.C. 
(Outer Banks between Ocracoke 1968 $ - $ - 
Inlet and Beaufort Inlet, N.C.) 
253 451-584 0-72-17

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 6-D OTHER AUTHORIZED NAVIGATION PROJECTS 
Cost to June 30, 1970 
For last 
Full Report, Operation 
See Annual and 
Project Report for Construction Maintenance 
Aquatic Plant Controll 
(R&H Act of 1958 and 1962) 1969 $ 70,664 $ - 
Atlantic Beach Channels, N.C.' 1966 18,501 1,176 
Bay River, N.C.1 1950 44,382 49,627 
Bellhaven Harbor, N.C.1 1953 126,687 5,901 
Black River, N.C.' 1969 12,358 124,846 
Cashie River, N.C. 1950 40,403 15,905 
Channel connecting Thoroughfare Bay with 
Cedar Bay, N.C.1 1960 69,610 22,873 
Channel from Pamlico Sound to Rodanthe, N.C. 1 1965 42,029 1,047 
Chowan River, N.C. 1950 - 
Contentnea Creek, N.C.' 1941 64,395 32,247 
Edenton Harbor, N.C. 1 1960 73,750 45,016 
Far Creek, N.C. 1967 164,642 294,786 
Fishing Creek, N.C. 1 1922 22,715 8,633 
Harbor of Refuge, N.C. 1934 1,368,799 32,854 
Knobb's Creek, N.C. 1'2 1961 80,500 45,292 
Mackay Creek, N.C.1 1938 13,375 4,773 
Manns Harbor, N.C. 1969 - 
Neuse River, N.C. 1966 447,648 295,531 
Newbegun Creek, N.C. 1 1928 4,802 247 
Northeast (Cape Fear) River, N.C.' 1950 10,688 61,139 
Pamlico and Tar Rivers, N.C. 1 1966 674,651 745,354 
Pembroke Creek, N.C. 1950 - 
Perquimans River, N.C. 1 1910 13,750 
Roanoke River, N.C. 1969 404,584 395,556 
Scuppernong River, N.C. 1 1950 81,164 78,366 
Shallotte River, N.C.1 1967 18,181 30,089 
Smiths Creek (Pamlico County), N.C. 1 1956 113,273 28,175 
Smiths Creek (Wilmington), N.C. 1 1950 8,507 18 
South River, N.C.1 1936 12,452 21,865 
Stumpy Point Bay, N.C. 1 1967 268,381 95,348 
Swift Creek, N.C.1 1940 1,600 5,422 
Trent River, N.C.' 1968 115,199 141,094 
Wallace Channel, Pamlico Sound, N.C. 1965 132,834 85,221 
Waterway connecting Swanquarter Bay with 
Deep Bay, N.C.1 1964 110,799 10,433 
Waterway-Norfolk, Va., to Sounds of 
North Carolina1 1963 - 4,829 
Wrights Creek, N.C. 1 1965 64,825 
1. Completed. 
2. Transferred from Norfolk District; Meherrin River, N.C., 
Transferred to Norfolk District. 
254

TABLE 6-G DAMS AND RESERVOIRS 
Estimated Cost 
See Miles Height Reservoir Power 
Section Project Name Nearest City River Above of Dam Type Capacity Development Construction Landsa Total 
in Text Mouth (ft) (acre-feet) (Kilowatts) Damages 
25. Cape Fear New Hope 2 Moncure, N. C. Haw 4.3 112 E 778,000 - $13,219,0003 $27,881,000 $41,100,000 
River Basin, Howards Mill Carthage, N. C. Deep 55.0 106 E 193,000 7,710,000 N. C. 6,590,000 14,300,000 
Randleman
2 
Randelman, N. C. Deep 85.0 102 E 105,000 7,570,000 8,230,000 15,800,000 
Small reservoirs - Various - 20 to 70+E 923,000 - - 38,454,000 
38. Neuse River Falls
2 
Falls, N. C. Neuse - 92 E 397,000 13,800,0004 26,800,000 40,600,000 
Basin, N. C. Wilson Mills Wilson Mills, N. C. Neuse - 81 C,E 201,000 - -9,800,000 
Beulahtown Kenly, N. C. Little - 50 E 81,000 - -6,200,000 
Bakers Mill Princeton, N. C. Little -- 53 E 36,000 - -6,600,000 
Little Buffalo Kenly, N. C. Little Buffalo Creek - 51 E 13,000 -1,100,000 
Buckhorn Wilson, N. C. Contentnea Creek - 63 E 119,000 - - 4,500,000 
Wiggins Mill Wilson, N. C. Contentnea Creek -- 42 E 35,000 - -6,700,000 
Stantonsburg Stantonsburg, N. C. Tisnot Swamp - 36 E 48,000 5,100,000 
Great Swamp Fremont, N. C. Great Swamp - 39 E 18,000 -- 1,800,000 
Black Creek Wilson, N. C. Black Creek - 33 E 17,000 -- - 1,500,000 
Aycock Swamp Fremont, N. C. Aycock Swamp - 37 E 7,000 550,000 
Hillsboro Durham, N. C. Eno - 136 E 123,000 8,100,000 
Orange Durham, N. C. Little - 107 E 57,000 - -3,500,000 
52. Roanoke River John H. Kerr, Va. and Boydton, Va. Roanoke 178.7 144 CG,E 2,808,000 204,000 63,595,000 24,521,000 88,116,000 
s 
Basin, Va. and N. C.
2 
N. C. Philpott, Va.
2 
Bassett, Va. Roanoke 336.2 220 CG11 249,800 14,000 13,050,000 1,157,000 14,207,000 
Gaston, Va. and N.C. 
6 
Roanoke Rapids, N. C. Roanoke 144.9 108 CG,E 432,000 54,000 27,000,000 3,500,000 30,500,000 
Roanoke Rapids, N. C. 
7 
Roanoke Rapids, N. C. Roanoke 137.0 75 CG 59,300 83,700 31,300,000 800,000 32,100,000 
Smith Mountain, Va.
5 
Altavista, Va. Roanoke 314.2 244 CG 825,000 41,000 28,000,000 3,800,000 31,800,000 
Leesville, Va.
9 
Altavista, Va. Roanoke 293.7 95 CG,E 76,900 20,000 9,100,000 1,000,000 10,100,000 
Taber, Va. Altavista, Va. Roanoke 275.0 54 CG 34,000 12,000 8,000,000 1,700,000 9,700,000 
Melrose, Va. Brookneal, Va. Roanoke 262.9 110 CG,E 120,000 43,000 17,700,000 6,000,000 23,700,00010 
Randolph, Va. Chase City, Va. Roanoke 227.8 147 CG,E 305,000 48,000 22,100,000 4,700,000 26,800,000 
Stuart, Va. and N. C. Spray, N. C. Roanoke 297.2 138 E 163,000 15,000 9,000,000 1,100,000 10,100,000 
Schoolfield, Va. and N. C. Danville, Va. Roanoke 265.9 126 CG,E 248,000 80,000 27,800,000 6,400,000 34,200,000 
1. Includes highway, railroad, and utility relocations. 
2. For details, see individual report. 
3. Includes $440,000 presently allocated to water supply to be reimbursed in the future by 
local interests. 
4. Includes $3,585,000 presently allocated to water supply and $2,432,000 recreation and 
fish and wildlife. 
5. Exclusive of transmission lines. 
6. Construction completed in 1963 by Virginia Electric and Power Co. 
7. Based on modified plan developed in fiscal year 1949. Construction completed June 1955 
by Virginia Electric and Power Co. 
8. Construction completed in Feb. 1966 by Appalachian Power Co. 
9. Construction completed in June 1963 by Appalachian Power Co. 
10. Includes cost of earth dam on Whipping Creek. 
11. Authorizing legislation provided for earth dam; concrete gravity dam constructed. 
Key 
E - Earth 
CG - Concrete Gravity 
L.(tnn 
0
t" 
0C,' 
Z
Z
Z
3

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 6-H OTHER AUTHORIZED FLOOD CONTROL PROJECTS
Cost to June 30, 1970 
For last 
Full Report, Operation 
See Annual and 
Project Report for Construction Maintenance 
Bodie Island, N.C. (Outer Banks between 
Virginia State Line and Hatteras Inlet, 
N.C.) 1968 $ $ - 
Conetoe Creek, N.C.1 1960 29,867 
Contentnea Creek, N.C. 1 1939-1943 50,889 
and 1958 
Core Creek, N.C.' 1965 233,223 
Ellerbe Creek, Durham County, N.C.1 1963 223,413 
Goldsboro, Neuse River, N.C. 1969 50,430 219,270 
Howards Mill Lake, N.C. 1969 - 
Hyde County Dike, N.C. (Mainland areas 
of N.C., excluding Washington and New 
Bern) 1968 
Neuse River Barrier, N.C. (New Bern N.C., 
and vicinity) 1968 - 
New River, N.C.1 1950 & 1956 51,896 
North River Dike, N.C. (Beaufort Inlet 
to Bogue Inlet) 1968 - 
Northeast (Cape Fear) River, N.C.1 1961 95,873 
Pantego Creek and Cucklers Creek, N.C. 1963 517,948 
Pasquotank River, N.C. 1960 80,931 
Perquimans River, N.C.' 1961 6,366 
Pungo River, N.C. 1969 296,602 
Scuppernong River, N.C.1 1969 45,907 
Swift Creek, Pitt and Craven Counties, N.C.1 1966 611,096 
Tar River, N.C. 1964 81,266 61,473 
Tar River, N.C.1 1947 18,624 
Tar River and tributaries, N.C.' 1943 22,660 
Tar River, Princeville, N.C. 1967 390,249 
Topsail Beach and Surf City, N.C. 
(Bogue Inlet to Moore Inlet) 1968 - 
Trent River, N.C.1 1953 64,769 
White Oak Dike Bladen and Pender 
Counties, N.C. 1963 214,286 
1. Project authorized by Chief of Engineers under special 
continuing authority. 
256

WILMINGTON, N.C., DISTRICT 
TABLE 6-I 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
Flood Control Activities Pursuant to Section 205, Public Law 858, 
80th Congress, as amended (Preauthorization) 
(See Section 51 of Text) 
Fiscal Year 
Study Identification Cost 
Adkins Branch, N. C. $ 4,782 
Cross Creek, N. C. 4,710 
Deep Creek, N. C. 17,970 
Green Mill Run, N. C. 28,166 
Nahunta Swamp, N. C. 6,910 
Swift Creek, N. C. 8,805 
Walnut Creek, N. C. 4,887 
TABLE 6-J COMPLETED FLOOD-PLAIN STUDIES 
(See Section 55 in Text) 
Requesting Date Federal 
Location Agency Completed Cost 
Walnut Creek, Raleigh, N. C. City of Raleigh, N. C. June 1965 $15,643 
Tar River, Tarboro, N. C. City of Tarboro, N. C. Oct. 1965 17,042 
Tar and Pamlico Rivers, City of Washington, N. C. Oct. 1965 11,135 
Washington, N. C. 
North and South Buffalo City of Greensboro, N. C. Oct. 1966 22,455 
Creeks, Greensboro, N. C. 
Ellerbe, Goose, Warren, Sandy, City of Durham, N. C. Jan. 1968 25,353 
and Third Fork Creeks, Durham, N. C. 
Tar River at Louisburg, N. C. Town of Louisburg, N. C. Mar. 1968 16,086 
Tar River and Stony Creek, City of Rocky Mount, N. C. Sept. 1968 23,939 
Rocky Mount, N. C. 
Roanoke River, Roanoke and Roanoke Valley Regional Oct. 1968 30,373 
Salem, Va. Planning Commission 
Peters Creek and Lick Run, Roanoke Valley Regional Jan. 1969 21,526 
Roanoke, Va. Planning Commission 
New River, Chaney, Mill, and City of Jacksonville, N. C. Mar. 1969 17,351 
Blue Creeks, Jacksonville, N. C. 
Mason Creek, Salem, Va. Roanoke Valley Regional Apr. 1969 7,548 
Planning Commission 
Neuse and Trent Rivers, and City of Bern, N. C. June 1969 11,667 
Jack Smith Creek, New Bern, N. C. 
Dan and Sandy Rivers, and Sandy City of Danville, Va. Mar. 1970 20,998 
Creek, Danville, Va. 
257

CHARLESTON, S.C., DISTRICT* 
This district comprises all of South Carolina (except 
local watersheds draining into the Savannah River), 
western-central North Carolina, and a very small 
portion of southwestern Virginia. It embraces the 
drainage basins tributary to the Atlantic Ocean 
between Little River and Port Royal Sound, except 
watersheds of Mackay and Skull Creeks, and excluding 
Hilton Head Island. 
IMPROVEMENTS 
Navigation Page 
1. Adams Creek, S.C. ................................. 259 
2. Aquatic Plant Control (R&H Act of 
1965) ........................................ 259 
3. Atlantic Intracoastal Waterway Between 
Norfolk, Va., and St. Johns River, 
Fla . .................................. ................... 260 
4. Charleston Harbor, S.C. ....................... 260 
5. Cooper River, Charleston Harbor, S.C. 
(St. Stephen Project) ..................... 261 
6. Georgetown Harbor, S.C. ...................... 261 
7. Port Royal Harbor, S.C ....................... 262 
8. Shipyard River, S.C ............................ 262 
9. Waccamaw River, N.C. & S.C. .............. 262 
10. Village Creek, S.C. ................................. 263 
11. Reconnaissance and Condition Surveys . 263 
12. Other Authorized Navigation Projects ... 263 
13. Navigation Activities Pursuant to 
Section 107, Public Law 86-645 
(Preauthorization) ............................... 263 
14. Navigation Work Under Special 
Authorization ...................................... 263 
Beach Erosion Control Page 
15. Hunting Island Beach, S.C. ................... 263 
16. Beach Erosion Control Work Under 
Special Authorization ...... ......... 263 
Flood Control 
17. Yadkin River, N.C ........................ 263 
17A. W. Kerr Scott Dam and Reservoir, 
Yadkin River, N.C ..... ............ 264 
17B. Reddies River Lake, N.C. ........................ 264 
18. Buck Creek, N.C. & S.C. ......................... 264 
19. California Branch, S.C ...................... 265 
20. Sawmill Branch, S.C. ............................. 265 
21. Shot Pouch Creek, Sumter County, S.C. 265 
22. Sugar and Briar Creeks, N.C. .............. 265 
23. Turkey Creek, Sumter County, S.C. ...... 266 
24. Flood Control Work Under Special 
Authorization ....................................... 266 
25. Other Authorized Flood Control Projects 266 
General Investigations 
26. 
27. 
28. 
Surveys ........................................ 266 
Collection and Study of Basic Data ....... 266 
Research and Development .................. 266 
NAVIGATION 
1. ADAMS CREEK, S.C. 
Location. The project is located in Charleston County, 
on the southeastern end of Wadmalaw Island near the 
village of Rockville. The estuarial creek flows generally 
southward into Bohicket Creek and from there into the 
North Edisto River and then into the Atlantic Ocean. 
Existing project. The project provides for a stable alltide 
channel 10 feet deep and 80 feet wide extending 
from that depth in Bohicket Creek to a turning basin in 
the vicinity of the uppermost dock at Rockland, a 
distance of 1.45 miles. The channel would be dredged 
to a 2-foot overdepth and would assume side slopes of 
around 4 horizontal to 1 vertical, and would follow the 
general alignment of the natural channel. (See Table 
at End of Chapter for Acts Authorizing Existing 
Project.) 
Operations and results during fiscal year. Preconstruction 
planning continued during the year. 
Condition at end offiscalyear. Construction has not been 
initiated. 
2. AQUATIC PLANT CONTROL (RIVER 
AND HARBOR ACT OF 1965) 
Location. Navigable waters, tributary streams, connecting 
channels, and other allied waters in the 
Charleston District. 
Existing project. The project provides for control and 
progressive eradication of water-hyacinth, alligatorweed, 
Eurasian watermilfoil and other obnoxious 
aquatic plant growths from navigable waters, 
tributary streams, connecting channels, and other 
allied waters of the United States, in combined interest 
of navigation, flood control, drainage, agriculture, fish 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
259

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
and wildlife conservation, public health and related 
purposes, including continued research for development 
of most effective and economic control 
measures in cooperation with other Federal and State 
agencies in accordance with report of Chief of 
Engineers. The act provides that research and 
planning cost shall be borne fully by the United States. 
(See Table at End of Chapter for Acts Authorizing 
Existing Project.) 
Local cooperation. Local interests must agree to hold 
the United States free from damages that may occur 
from operations performed in connection with this 
project, and participate to extent of 30 percent of cost of 
program. Requirements are being met in South 
Carolina. 
Operations and results during fiscal year. New Work: 
Chemical control operations were continued by Corps 
of Engineers personnel in the Little Pee Dee River, 
Black River, Black Mingo Creek, North Fork Edisto 
River and Congaree River basins. Colonies of Flea 
Beatles (Agasicles) established for the biological 
control of alligatorweed at Foster Creek near Charleston, 
at Halfway Swamp on Lake Marion and in the 
Edisto and Ashepoo River basins were very active 
during September 1969. Monitoring operations at 
those release sites during June 1970 revealed very little 
activity although the existence of the beatles was still 
apparent. 
Condition at end of fiscal year. Chemical spraying 
operations have been made on approximately 750 
acres of alligatorweed under effective control in the five 
basins cited above. Adaptation of biological agents to 
local climatic conditions should result in additional 
acreage being brought under control. The state design 
memorandum has been updated and approved. 
3. ATLANTIC INTRACOASTAL 
WATERWAY BETWEEN NORFOLK, 
VA., AND ST. JOHNS RIVER, FLA. 
(CHARLESTON DISTRICT) 
Location. The project is on Little River near the 
North and South Carolina State line and extends 
generally south along the coast of South Carolina 62 
miles to Winyah Bay; thence 63.5 miles to Charleston; 
thence 84.5 miles to and including Port Royal Sound; a 
total of 210 miles. (See U.S. Coast and Geodetic Survey 
Charts Nos. 835, 836 and 838.) 
Previous projects. For further details see page 613 of 
Annual Report for 1932. 
Existing project. The project provides for a waterway 
12 feet deep and not less than 90 feet wide with a 
branch channel of the same dimensions to McClellanville, 
and construction of three bridges crossing the 
waterway in Horry County, S.C. (See Table at End of 
Chapter for Acts Authorizing Existing Project.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are rail-water terminals at 
Georgetown, Charleston, Johns Island and Port Royal, 
and numerous open-pile wharves mostly for shipping 
agricultural products, fish, oysters, pulpwood, wood 
products, and petroleum products. Marinas are at 
convenient intervals along entire waterway where 
limited supplies and repairs are available for both 
commercial vessels and pleasure craft. Facilities are 
considered adequate for existing commerce and 
recreation requirements. 
Operations and results during fiscal year. Maintenance: 
The pipeline dredge Arlington performed maintenance 
dredging by contract during November 1969-June 
1970, restoring project dimensions in 5 shoaled areas 
from Beaufort to Charleston, 13 shoaled areas from 
Charleston to Winyah Bay and 8 shoaled areas from 
Winyah Bay to Little River, S.C., removing a 
combined total of 1,838,720 cubic yards of material 
and one obstruction at a former bridge site for $531, 
459. Construction of spoil dikes and installation of 
Government furnished spillways was performed by 
Cape Romain Contractors, Inc., February-June 1970, 
at a combined cost of $122,508. Clearing and snagging 
by the U. S. maintenance vessel Snell and hired labor 
was performed at a cost of $23,124. Surveys and 
supervision costs were $147,677. 
Condition at end of fiscal year. Existing project was 
completed in 1940; three bridges were completed in 
1936. Federal costs on existing project to date have 
been $7,345,888 for new work and $10,910,385 for 
maintenance for a total of $18,256,273. 
4. CHARLESTON HARBOR, S.C. 
Location. The harbor is located on the coast of South 
Carolina about 15 miles southerly of the midpoint of 
the coastline, 50 miles southwest of Winyah Bay, S.C. 
and 80 miles northeast of the mouth of Savannah 
River. (See U.S. Coast and Geodetic Survey Charts 
Nos. 1239 and 470.) 
Previous projects. For further details see page 1808 of 
Annual Report for 1915; page 579 of Annual Report 
for 1926 and page 562 of Annual Report for 1938. 
Existing project. The authorized project provides for a 
channel 35 feet deep from the Atlantic Ocean to the 
mouth of Goose Creek, a total of 21.9 miles, together 
with a 35-foot depth channel via Town Creek. Also, a 
10-foot depth channel on the Mount Pleasant side of 
the harbor into Shem Creek to U.S. Highway 17 
bridge, and a 30-foot anchorage basin in the lower 
harbor between Castle Pinckney and Fort Moultrie. A 
40-foot channel estimated to cost $6,060,000 was 
authorized to be executed when found necessary in the 
interests of national defense from the 40-foot contour in 
Atlantic Ocean to U. S. Naval Base. For further details 
see page 425 of Annual Report for 1962. (See Table at 
End of Chapter for Acts Authorizing Existing Project.) 
Local cooperation. Local interests have fully complied 
with their responsibility to date but are experiencing 
difficulty in securing suitable disposal areas for dredged 
material for continued future maintenance. 
Terminal facilities. Piers and slips extend for about 1 
mile along the eastern waterfront of the city of 
Charleston with an additional mile of marginal 
wharves. South Carolina State Ports Authority 
operates 8 piers for fruit, wood, cold storage facilities 
and general cargo, a grain elevator and a beltline 
260

CHARLESTON, S.C., DISTRICT 
railway which serves the entire Cooper River 
waterfront. Modern facilities are also at wharves of 7 
major petroleum companies including storage tank 
farms. Modern facilities for marine repairs and 
servicing are also available at Jacksonville Shipyards, 
Inc., Charleston Division. The U.S. Navy Department 
has modern facilities for construction and maintenance 
of naval vessels including atomic submarines. Loading 
docks and storage areas for missile-carrying type vessels 
have also been constructed and are being operated by 
the U.S. Navy. For further details see Port Series No. 
13, Corps of Engineers. 
Operations and results during fiscal year. Maintenance: 
The pipeline dredges Cherokee, Clinton, and Enterprise 
performed maintenance dredging and dike repairs by 
contract during July-September 1969, removing 1,935, 
737 cubic yards of material for $737,807. The pipeline 
dredges Clinton and Booster performed maintenance 
dredging in the Anchorage Basin during October 1969- 
January 1970, by contract removing 1,279,908 cubic 
yards of material for $688,524. The hopper dredge 
Gerig and hired labor performed maintenance dredging 
in the entrance channel during June 1970, removing 
200,000 cubic yards of material at a cost of $102,236. 
Surveys and supervision costs were $211,619. 
Condition at end of fiscal year. Jetties protecting the 
entrance channel across the bar were completed in 
1895. The existing project was completed in October 
1962, except for the national defense portion. 
Federal costs under the existing project to date have 
been $3,328,349 for new work and $28,975,316 for 
maintenance, a total of $32,303,665. 
5. COOPER RIVER, CHARLESTON 
HARBOR, S.C. (ST. STEPHEN 
PROJECT) 
Location. Cooper River is located in Charleston and 
Berkeley Counties, S.C., and empties into the Atlantic 
Ocean at Charleston. 
Existing project. The major cause of the shoaling 
problem in Charleston Harbor is the diversion of fresh 
water from the Santee River through Pinopolis Dam 
into the salt water of Charleston Harbor, causing 
density currents which trap sediments resulting in a 
phenomenal rate of deposition. The most practical and 
economical solution of the shoaling problem is to 
redivert most of the Santee River waters above 
Pinopolis Dam into the lower Santee River through a 
canal beginning at Lake Moultrie and extending to the 
Santee River in the vicinity of St. Stephen, South 
Carolina. The existing project for Cooper River as 
authorized by the River and Harbor Act (See Table at 
End of Chapter for Acts Authorizing Existing Projects) 
provides that the discharge through the existing 
Pinopolis Hydro Plant be reduced to an average of 3, 
000 cubic feet per second. This flow would not establish 
a density current in the harbor. The excess water then 
impounded in Lake Moultrie would be directed 
through a new canal above St. Stephen, South 
Carolina, to enter the Santee River at a point well 
below the Lake Marion Spillway (Wilson Dam). A new 
hydroelectric facility would be constructed on the new 
canal where the ground elevations decrease to become 
swampland adjacent to the Santee River. This plant 
would replace those features made ineffective at 
Pinopolis through curtailment of flows. The power 
production flow of 24,500 cfs at the new powerplant, 
plus the proposed 3,000 cfs average release planned for 
Pinopolis, would approximate the existing total 
Pinopolis flow capacity. The three generators at the 
new plant would be rated at 28,000 kilowatts each, for 
a total of 84,000 kilowatts. In the interest of fish and 
wildlife resources of the area, the plan would also 
provide for construction of a herring lift at the new 
powerhouse site and a relocated fish hatchery, if found 
necessary; and a gated structure on the South Santee 
River for control of salinity in the delta reaches. 
Local cooperation None needed. The gated structure on 
South Santee, originally thought to be subject to local 
cooperation is for the purpose of migratory waterfowl 
which is a federally sponsored program. 
Operations and results during fiscal year. During FY 70 
early implementation studies were completed and a 
report was written. Authority for this study was by 
OCE using O&M funds. Advance Engineering and 
Design Studies were initiated after funds were released 
in April 1969 and studies continued in FY 70-target 
date for 6 Design Memorandum is 1 July 1970. 
Condition at end of fiscal year. The project is currently in 
the advanced planning stage. 
6. GEORGETOWN HARBOR, S.C. 
Location. The harbor is located on the coast of South 
Carolina 50 miles northeast of Charleston Harbor and 
90 miles southwest of entrance to Cape Fear River, 
N.C. (See U.S. Coast and Geodetic Survey Chart No. 
787.) 
Previous projects. For further details see page 1806 of 
Annual Report for 1915; page 549 of Annual Report 
for 1938; and page 442 of Annual Report for 1944. 
Existing project. The authorizations provide for a 
channel 27 feet deep with varying widths of 600 to 400 
feet from the Atlantic Ocean to and including a 
turning basin at U.S. Highway 17 bridge over Sampit 
River, a total of 17.9 miles. The project also provides 
for the continued maintenance to a depth of 18 feet and 
a width of 400 feet for the bypassed portion of Sampit 
River opposite the city of Georgetown. (See Table at 
End of Chapter for Acts Authorizing Existing Project.) 
Local cooperation. Fully complied with. 
Terminal facilities. Terminal facilities at port of 
Georgetown suitable for oceangoing vessels consist of 
one concrete marginal pier and one of creosoted-timber 
construction. For intracoastal waterway traffic there 
are a number of smaller wharves and landing places 
along the Georgetown waterfront on the old channel. 
For further details see Port Series No. 16, 1955, Corps 
of Engineers. 
Operations and results during fiscal year. Maintenance: 
The pipeline dredges Talcott and Booster performed 
maintenance dredging in Sampit River, Upper 
Winyah Bay, and Eastern Channel by contract during 
261

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
December 1969-April 1970, removing 1,543,859 cubic 
yards of material for $536,711. Dike removal and 
drainage work was performed by contract during 
April-June 1970 for $6,200. The hopper dredge Hyde 
and hired labor performed maintenance dredging in 
the entrance channel during August-October 1969, 
removing 307,128 cubic yards of material for $186,572. 
Surveys and supervision costs were $104,225. 
Condition at end of fiscal year. The existing project was 
completed in 1951. The jetties were completed in 1903- 
04.
Federal costs for the existing project to date have 
been $4,615,903 for new work and $10,114,992 for 
maintenance, a total of $14,730,895. 
7. PORT ROYAL HARBOR, S.C. 
Location. The harbor is located on the coast of South 
Carolina 57 miles southwest of Charleston Harbor and 
23 miles northeast of entrance to Savannah River, Ga. 
(See U.S. Coast and Geodetic Survey Chart No. 571.) 
Existing project. The authorized project provides for a 
channel from the ocean through Port Royal Sound to 
Port Royal, S.C.; 27 feet deep and 500 feet wide across 
the ocean bar and in Port Royal Sound for 
approximatley 12.7 miles, thence 24 feet deep and 300 
feet wide in Beaufort River and Battery Creek for 
approximately 8.3 miles to and including a turning 
basin 27 feet deep and 600 feet wide opposite wharf of 
South Carolina State Ports Authority. (See Table at 
End of Chapter for Acts Authorizing Existing Project.) 
Local cooperation. Fully complied with. 
Terminal facilities. The South Carolina State Ports 
Authority constructed a concrete marginal wharf and 
operates modern terminal facilities which are considered 
adequate for present commerce of the port. 
Operations and results during fiscal year. Maintenance: 
The pipeline dredge Arlington performed maintenance 
dredging by contract during November 1969 removing 
53,578 cubic yards of material for $12,715. The hopper 
dredge Hyde and hired labor performed maintenance 
dredging in the entrance channel during December 
1969-January 1970, removing 274,902 cubic yards of 
material for $163,842. Surveys and supervision costs 
were $57,443.. 
Condition at end of fiscal year. The existing project was 
completed in 1959. 
8. SHIPYARD RIVER, S.C. 
Location. This waterway is a tidal tributary of 
Charleston Harbor, South Carolina. It has its source 
about one-half mile below the U.S. Naval Base, 
whence it flows southerly about 3 miles and empties 
into Cooper River about three-fourths mile above 
Drum Island. (See U.S. Coast and Geodetic Survey 
Chart No. 470.) 
Previous projects. For details see page 610 of Annual 
Report for 1932 and page 463 of Annual Report for 
1944. 
Existing project. The authorized project provides for a 
channel 30 feet deep from Cooper River to Airco Alloys 
& Carbide, A Division of Air Reduction Co. Inc.'s 
plant including two turning basins; one opposite Gulf 
Oil Corporation terminal and another at the upper end 
of project. (See Table at End of Chapter for Acts 
Authorizing Existing Project.) 
Local cooperation. Fully complied with. 
Terminal facilities. In the lower three-quarter of a mile 
of the channel are large marginal wharves of the Gulf 
Oil Corporation and Shipyard River Terminal 
Company. These wharves accommodate deep-craft, 
oceangoing vessels for handling petroleum products 
and fertilizer materials. In the upper channel is Airco 
Alloys & Carbide, A Division of Air Reduction 
Company, Inc.'s wharf for handling ores. 
Operations and. results during fiscal year. Maintenance: 
The pipeline dredge Enterprise performed maintenance 
dredging by contract during August-September 1969, 
removing 294,362 cubic yards of material for $98,309. 
A claim under a prior year contract was settled for $18, 
958. Surveys and supervision costs were $15,605. 
Condition at end of fiscal year. The existing project was 
completed in 1951. Federal costs under the existing 
project to date have been $487,824 for new work and 
$4,227,591 for maintenance, a total of $4,715,415. 
9. WACCAMAW RIVER, N.C. & S.C. 
Location. The river rises at Lake Waccamaw, N.C., 
and flows southwest 139.9 miles into Winyah Bay near 
Georgetown, South Carolina. (See Geological Survey 
map of North and South Carolina, 1929.) 
Previous projects. For details see page 675 of Annual 
Report for 1950. 
Existing project. The authorized project provides for a 
channel 12 feet deep at mean low water, with 80 feet 
bottom width, from the mouth of the river to Conway, 
S.C., 41.5 miles, thence a channel 4- feet deep at low 
water and 50 feet wide to Red Bluff, S.C., 25.5 miles 
above Conway; thence a cleared channel to Lake 
Waccamaw. (See Table at End of Chapter for Acts 
Authorizing Existing Project.) 
Local cooperation. Fully complied with to date. 
Terminal facilities. At Bucksport (mile 27.0) which is 
also on the Atlantic Intracoastal Waterway, there is a 
wharf where marine fuel and limited marine supplies 
may be obtained. There are a few privately owned 
wharves used for loading pulpwood on barges. These 
are considered adequate for existing commerce. 
Operations and results during fiscal year. Snagging and 
clearing was performed by the Maintenance Vessel 
Snell and hired labor during April-May 1970, from 
Conway, S.C., 13 miles upstream, at a cost of $19,100. 
Condition surveys were made in March at a cost of 
$500. 
Condition at end of fiscal year. The 12-foot channel to 
Conway, S.C. (mile 41.5) was completed in 1924 and 
the 4-foot channel to Red Bluff (mile 70) in 1931. A 
condition survey during 1965 showed a controlling 
depth of 7.0 feet at mean low water from Enterprise to 
Conway (mile 41.5). From Conway to Red Bluff (mile 
262

CHARLESTON, S.C., DISTRICT 
70), sandbars limit the controlling depth to 2.8 feet at 
mean low water for a width of 30 feet. 
10. VILLAGE CREEK, S.C. 
Location. Village Creek is located on the northeastern 
end of St. Helena in Beaufort County, approximately 
12 miles from the town of Beaufort. This creek, which is 
about 600 feet wide at its confluence with Morgan 
River and St. Helena Sound at a point 7 miles from the 
Atlantic Ocean, extends in a southwesterly direction a 
distance of 6.8 miles to its headwaters. 
Existing project. The authorized project provided for a 
channel 8 feet deep and 80 feet wide from the mouth of 
Village Creek upstream to the Porpoise Fish Company 
Terminal for a distance of 2.2 miles. (See Table at End 
of Chapter for Acts Authorizing Existing Project.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. The pipeline 
dredge Arlington performed maintenance dredging by 
contract, during November-December 1969, removing 
12,927 cubic yards of material for $3,585. Surveys and 
supervision costs were $7,415. 
Condition at end of fiscal year. The project was 
completed in April 1966. 
11. RECONAISSANCE AND CONDITION 
SURVEYS 
Condition surveys were made on Ashley River 
during June 1970 at a cost of $1,500. 
12. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See Table 7-C) 
13. NAVIGATION ACTIVITIES PURSUANT 
TO SECTION 107, PUBLIC LAW 86-645 
(PREAUTHORIZATION) 
Funds in the amount of $2,500 were expended 
during the fiscal year on an investigation of a project in 
the vicinity of Bushy Industrial Park, Cooper River 
Channel, Berkeley County, South Carolina. The fiscal 
year cost was $7,604 for studies on Port Victoria, 
located on the Colleton River in Beaufort County, S.C., 
12 miles northwest of Hilton Head, South Carolina. A 
detailed project report was prepared for Town Creek, 
which is located in Charleston County, one mile 
southwest of McClellanville, South Carolina, at a fiscal 
year cost of $13,900. 
14. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION 
Snagging and clearing for navigation (Sec. 3 of 1945 River 
and Harbor Act, Public Law 14, 79th Cong.) 
Fiscalyear cost: None. 
BEACH EROSION CONTROL 
15. HUNTING ISLAND BEACH, S.C. 
Location. Hunting Island is a state park comprising 
about 1,850 acres of wooded land and is located along 
the southeastern shore of South Carolina in Beaufort 
County, 16 miles east of the town of Beaufort, 9 miles 
southwest of Edisto Beach, and 35 miles northeast of 
Tybee Roads at the mouth of Savannah River. (See 
U.S. Coast and Geodetic Chart No. 793.) 
Existing project. The authorized project provides for 
periodic nourishment of about 10,000 feet of beach on 
the northern part of the island with initial placement of 
750,000 cubic yards of sand for advance nourishment, 
and construction of one prestressed concrete groin at 
the north end of the island. Federal participation in 
periodic nourishment is limited to a period of 10 years. 
(See Table at End of Chapter for Acts Authorizing 
Existing Project.) 
Local cooperation. All requirements of local cooperation 
have been met by the State of South 
Carolina and accepted by the Chief of Engineers. The 
state contributed 30 per cent of cost of the project and 
agreed during the 10-year period following initial 
construction to contribute, prior to the periodic 
nourishment work, 30 per cent of the cost thereof. 
Operations and results during fiscal year. Beach profiles 
were taken. 
Condition at end of fiscal year. Beach profiles taken 
during FY 70 indicated that upwards of 260,000 cubic 
yards of the beach fill placed in December 1968 had 
been lost. It is planned to renourish the beach with 
750,000 cubic yards of sand during the spring of 1971. 
16. BEACH EROSION CONTROL UNDER 
SPECIAL AUTHORIZATION 
ACTIVITIES PURSUANT TO SECTION 
103, PUBLIC LAW 87-874 
(PREAUTHORIZATION) 
None. 
FLOOD CONTROL 
17. YADKIN RIVER, N.C. 
Location. The river rises on the eastern slope of the 
Blue Ridge Mountain in western North Carolina, flows 
generally easterly 100 miles to vicinity of Dannaha, 
N.C., thence southeasterly 104 miles to its confluence 
with Uwharrie River near Badin, N.C., where its name 
changes to Great Pee Dee River. (See U.S. Geological 
survey map of North Carolina.) 
Existing project. The Flood Control Act of July 24, 
1946, authorized construction of four flood-control 
dams in the upper Yadkin River Basin, two on the 
Yadkin River above Wilkesboro, N.C., and two on 
Reddies River, a tributary stream. Studies made 
subsequent to authorization established the economic 
advantage of providing needed flood-control storage in 
only two reservoirs, one on the Reddies and one on the 
263

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Yadkin. Present planning considers only the tworeservoir 
plan. Cost for the Yadkin River Reservoir (W. 
Kerr Scott Dam and Reservoir constructed 1962) and 
for Reddies River Lake is set forth in Table 7-D. (See 
Table at End of Chapter for Acts Authorizing Existing 
Project.) 
Funds of $131,500 have been expended on the 
Reddies River Lake Project for project planning and 
preparation of a definite project report which was 
completed in March 1950. An economic restudy of the 
Reddies River Lake Project was submitted and 
approved in July 1968. Individual reports on W. Kerr 
Scott Dam and Reservoir and Reddies River Lake 
Project follow. 
17A. W. KERR SCOTT DAM AND 
RESERVOIR, YADKIN RIVER, N.C. 
Location. W. Kerr Scott Dam and Reservoir is on 
Yadkin River, N.C., about 6 miles upstream from 
Wilkesboro. At full flood-control pool elevation (1075 
feet mean sea level), the reservoir extends 15.7 miles 
upstream to Wilkes-Caldwell County line. 
Existing project. The project consists of a rolled 
earthfill dam 1,740 feet long, with crest at elevation 1, 
107.5 feet mean sea level, or about 148 feet above 
streambed elevation; a spillway near the north 
abutment of the dam in a rock cut with crest elevation 
1075; and outlet works consisting of an intake 
structure, control tower, and a circular concrete 
conduit 12.25 feet in diameter through the base of the 
dam near the south abutment. The reservoir has a gross 
capacity of 153,000 acre-feet of which 112,000 acre-feet 
are reserved for flood control, 33,000 acre-feet will be 
used when required for water supply, and 8,000 acrefeet 
being contained in the minimum pool. (See Table 
at End of Chapter for Acts Authorizing Existing 
Project.) 
Local cooperation. Fully complied with. For details see 
page 413 of Annual Report for 1963. 
Operations and results during fiscal year. New Work: 
Construction of recreation facilities at completed 
project (Code 710) cost $133,151. Maintenance: 
Operation and maintenance cost $248,204. 
During the fiscal year the project had a visitation of 
546,759. All recreation facilities continue to be utilized 
beyond their maximum capabilities during fair 
weather. Acquisition of additional lands and construction 
of recreational facilities authorized under the 
Appalachia Program has resulted in the project having 
the capability to accommodate approximately 250,000 
additional visitors annually. The majority of visitor 
requirements continues to be for camping and 
picnicing facilities. On three occasions the watershed 
area received excessive amounts of rainfall, resulting in 
the necessity to control the outflow to prevent possible 
flood damages to the areas below the dam. All outlet 
works facilities performed efficiently with a minimum 
amount of time required for control operation. 
Condition at end of fiscal year. The project was 
commenced in August 1960 and placed in operation for 
flood control and water storage purposes in February 
1963. 
17B. REDDIES RIVER LAKE, N.C. 
Location. The Reddies River flows into the Yadkin 
River near the town of North Wilkesboro, N.C., and is 
a tributary to the Yadkin-Pee Dee River. The 
authorized lake and damsite are located entirely in 
Wilkes County, North Carolina. 
Existing project. Reddies River Lake is the second unit 
in the authorized plan for the upper Yadkin River 
Basin. The first unit, W. Kerr Scott Reservoir, is 
located about 5 miles upstream from the mouth of the 
Reddies River and was completed in 1962. The 
Reddies damsite is located on Reddies River at mile 
1.7, near the town of North Wilkesboro. Total tributary 
area above the damsite is 94.5 square miles. Project 
works contemplate construction of a rolled-earth dam 
about 165 feet high with a saddle spillway and a gated 
outlet conduit. The conservation pool will cover about 
720 acres and the flood control pool about 1,383 acres. 
The project was authorized by the Flood Control Act of 
1946; however, the project was deferred for restudy in 
1950. An economic restudy was submitted in FY 69 
and approved in FY 70. AE&D funds were appropriated 
in FY 70, but, the funds were held in 
budgetary reserve throughout FY 70. (See Table at 
End of Chapter for Acts Authorizing Existing Project.) 
Local cooperation. The state of N.C. has given letters of 
intent to fulfill the local cooperation requirements 
necessary for water supply and development of 
recreational facilities. 
Operations and results during fiscal year. The economic 
restudy referred to above was submitted to higher 
authority by Charleston District during the fiscal year 
as were post authorization charges. 
Condition at end of fiscal year. Construction funds for 
AE&D have been appropriated. Studies are underway. 
18. BUCK CREEK, N.C. & S.C. 
Location. Buck Creek lies in Horry County, South 
Carolina and outlets into the Waccamaw River 2,500 
feet upstream of S.C. Route 9. The upper limits of the 
Buck Creek project extends 11.4 miles upstream of the 
confluence with Waccamaw River. Major tributaries 
included in construction are Deep Branch, Camp 
Swamp and Hawkins Branch. Camp Swamp and 
Hawkins Branch extend into Columbus County, N.C. 
Existing project. The project provides for excavating a 
channel varying in width ranging from 35 feet down to 
15 feet up Buck Creek from the Waccamaw River, also 
excavating up Deep Branch, Camp Swamp and 
Hawkins Branch. (See Table at End of Chapter for 
Acts Authorizing Existing Project.) 
Local cooperation. Fully complied with. 
264

CHARLESTON, S.C., DISTRICT 
Operations and results during fiscal year. The project was 
completed in July 1969 and turned over to local 
sponsors for maintenance. The maintenance manual 
has been provided to the local sponsors. 
Condition at end of fiscal year. The project was 
completed in July 1969 and is being maintained 
satisfactorily. 
19. CALIFORNIA BRANCH, S.C. 
Location. California Branch is located in Berkeley 
County, S. C. The stream originates west of the town of 
Moncks Corner and flows east-northeast through the 
town and outlets into the old Santee Canal. The 
watershed contains 3,008 acres of which 705 acres lie 
within the Moncks Corner town limits. 
Existing project. The project provides for channel 
clearing and snagging about 4.5 miles upstream from 
the Santee Canal. (See Table at End of Chapter for 
Acts Authorizing Existing Project.) 
Local cooperation. Local interests must furnish all 
lands, easements, rights-of-way and necessary 
relocations. Local assurances are not fully complied 
with due to difficulties encountered when pursuing 
right-of-way. The district is awaiting local assurance. 
Operations and results during fiscal year. Plans and 
specifications were prepared in draft form during the 
fiscal year. 
Condition at end of fiscal year. Project is in preconstruction 
stage. 
20. SAWMILL BRANCH, S.C. 
Location. The Sawmill Branch Watershed is located 
in Dorchester, Berkeley and Charleston Counties in the 
South Carolina coastal plain. The stream originates in 
Berkeley County, flows through the southern part of 
Summerville, and outlets into the Ashley River. The 
total length of Sawmill Branch is about 12.3 miles. The 
watershed area is 13,851 acres. Most of the town of 
Summerville and part of Lincolnville are within the 
watershed. 
Existing project. The project provides for excavating a 
channel of varying sizes ranging from a maximum of 35 
feet to 15 feet up Sawmill Branch from a point above its 
confluence with the Ashley River about 1,400 feet 
below the S.C. Route 642 crossing. The project extends 
through Summerville to a point 9.0 miles from its 
beginning. (See Table at End of Chapter for Acts 
Authorizing Existing Project.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. A contract was 
awarded in June 1969 and construction continues. 
Condition at end of fiscal year. The project is under 
construction. Work was initiated in June 1969 and 
completion is scheduled for September 1970. 
21. SHOT POUCH CREEK, SUMTER 
COUNTY, S.C. 
Location. Shot Pouch Creek watershed is located in 
Sumter County in and near the city of Sumter. Shot 
Pouch Creek flows through the city of Sumter and 
empties into Green Swamp. Green Swamp is a major 
tributary of the Pocotaligo River. 
Existing project. The project provides for channel 
enlargement on Shot Pouch Creek from Swan Lake to 
the Sumter Bypass. The improved channel will have a 
length of 2.15 miles with bottom widths varying from 
30 feet at the outlet to 14 feet at the upstream end. 
Right-of-way requirements will vary from 150 feet to 
120 feet. (See Table at End of Chapter for Acts 
Authorizing Existing Project.) 
Local cooperation. Fully complied with. The city of 
Sumter is the local sponsor of this project. 
Operations and results during fiscal year. The project was 
substantially complete at the end of FY 70, and is 
functioning as designed. 
Condition at end of fiscal year. Project is nearing 
completion. 
22. SUGAR AND BRIAR CREEKS, N.C. 
Location. Little Sugar Creek, a tributary of Sugar 
Creek has its source about one-half mile northwest of 
the Charlotte, N.C. city limits, whence it flows 
generally southwest through the eastern portion of 
Charlotte, for a distance of about 11 miles, continuing 
southwardly about 7 miles to its confluence with Sugar 
Creek near the N.C.-S.C. state line. Briar Creek, a 
tributary of Little Sugar Creek, has its source near the 
Charlotte city limits, whence it flows southwesterly a 
distance of about 9 miles through the eastern portion of 
Charlotte to its confluence with Little Sugar Creek 
near the southerly city limits of Charlotte. 
Existing project. The project provides for excavating a 
50 foot wide channel up Little Sugar Creek from 
Archdale Road to sta 40+41 which is beyond the 
confluence of Little Sugar and Briar Creeks. From 
there it is to be excavated 40 feet wide up to station 
228+ 00 at Randolph Road which is the end of the 
project. (See Table at End of Chapter for Acts 
Authorizing Existing Project.) 
Local cooperation. Local interest must provide lands, 
easements, rights-of-way, utility relocations and 
alterations, and highway or highway-bridge construction 
and alterations necessary for construction; 
hold the United States free from damages; maintain 
and operate project after completion; prevent future 
encroachment and notify affected interests annually 
that the improvement will not provide complete flood 
protection. 
Operations and results during fiscal year. Project is still in 
preconstruction planning stage. Awaiting local 
assurances. 
265

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end of fiscal year. Project is in advance 
engineering and design stage. 
23. TURKEY CREEK, SUMTER COUNTY, 
S.C. 
Location. Turkey Creek, located in Sumter County, 
S.C., originates northeast of the city of Sumter and 
flows southward through the eastern edge of the city to 
its confluence with the Pocotaligo River. The total 
length of Turkey Creek is about 5.8 miles. 
Existing project. The project provides for channel 
enlargement from the Pocotaligo River to a point 4.5 
miles upstream. (See Table at End of Chapter for Acts 
Authorizing Existing Project.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Preconstruction 
planning was completed during the fiscal year. 
Condition at end of fiscal year. Project is awaiting 
construction funds. Plans and specifications have been 
completed. 
24. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood Control Activities Pursuant to Section 205, Public Law 
685, 84th Congress, as amended (Preauthorized) 
(See Table 7-E) 
Emergency Flood Control Activities - Repair, Flood Fighting 
and Rescue Work (Public Law 99, 84th Congress, and 
Antecedent Legislation) 
Federal cost for the fiscal year was $5,729 for 
advance preparation and $536 for determination of 
storm damages. 
Snagging and Clearing of Navigable Streams and Tributaries 
in Interest of Flood Control (Section 208 of 1954 Flood Control 
Act, Public Law 780, 83rd Congress, Preauthorization) 
Federal costs for the fiscal year 1969 for clearing and 
snagging include only cost incurred. 
On projects approved for construction. See individual 
project write-up in narrative section for 
additional information. 
25. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 7-F) 
GENERAL INVESTIGATIONS 
26. SURVEYS 
Total cost for the fiscal year was $230,499 of which 
$134,157 was for navigation studies, $50,132 for flood 
control studies and $7,790 for watershed studies in 
coordination with the U.S. Soil Conservation Service, 
and $36,333 for Beach Erosion Cooperative Study at 
Hilton Head Island, S.C., and $2,087 for the National 
Shoreline Study. 
27. COLLECTION AND STUDY OF BASIC 
DATA 
Cost during fiscal year was $127,446 for flood plain 
information studies. (See Table 7-G at End of Chapter 
for completed flood plain studies) 
28. RESEARCH AND DEVELOPMENT 
Hydrologic studies. Costs of collecting stream flow data, 
with storm and hydrologic studies, during the fiscal 
year was $4,100. 
266

CHARLESTON, S.C., DISTRICT 
TABLE 7-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
1. Adams Creek, S.C. 
2. Aquatic Plant 
Control (R&H Act of 
1965) 
3. Atlantic Intracoastal 
Waterway 
between Norfolk, Va. 
and the St. Johns 
River, Fla. 
4. Charleston Harbor, 
S.C. 
5. Cooper River 
Charleston Harbor, 
S.C. (St. Stephen 
Project) 
6. Georgetown Harbor, 
S.C. 
7. Port Royal Harbor, 
S.C. 
8. Shipyard River, S.C. 
9. Waccamaw River, 
N.C. and S.C. 
10. Village Creek, S.C. 
15. Hunting Island 
Beach, S.C. 
17A. W. Kerr Scott Dam 
and Reservoir, N.C. 
(Wilkesboro 
Reservoir, N.C.) 
Funding 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Total to 
FY 67 FY 68 FY 69 FY 70 June 30, 1970 
2,000 
2,000 
$ 13,000 $ 
6,785 
30,000 
23,048 
- - 
632,000 429,000 
577,523 427,130 
2,118,000 
2,046,070 
573,000 
731,043 
178,000 
110,607 
148,000 
95,260 
350,000 
26,127 
24,300 
52,951 
169,300 
161,558 
1,379,400 2, 
1,921,786 1, 
- $ 4,700 $ 17,700 
6,215 1,117 14,117 
35,000 11,000 78,000 
27,607 17,708 70,3621 
- - 7,455,3782 
- - 7,455,378 
525,000 845,940 11,007,3463 
604,216 824,768 10,979,8053 
- - 9,914,8044 
- - 9,914,8044 
,102,200 1,396,720 30,315,2085 
,958,653 1,740,186 29,377,305 s 
- 200,000 200,000 
52,328 52,328 
613,000 792,000 
457,636 965,305 
86,000 
153,393 
-13,000 
64,767 
12,000 
12,000 
61,000 
112,800 
103,953 
27,863 
239,900 
187,436 
165,000 
165,000 
162,000 
126,479 
21,000 
277,729 
115,452 
90,471 
208,000 
249,376 
1,367,818 
833,708 
235,000 
234,000 
196,583 
132,872 
19,600 
19,600 
11,000 
11,000 
1,357 
66,000 
133,151 
250,811 
248,204 
7,061,7556 
7,061,7556 
10,763,6587 
10,229,548 
1,786,100 
1,786,100 
1,685,334 
1,684,334 
491,9748 
491,9748 
4,402,692 
4,227,591 
262,814 
262,814 
257,413 
257,413 
26,500 
26,500 
47,230 
47,230 
432,0009 
418,013 
8,653,92610 
8,612,973 
1,276,111 
1,248,716 
267

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 7-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
17B. Reddies River Lake, New Work: 
N.C. Approp. $ - $ - $ 58,000 $ - $189,50011 
Cost - - 47,194 10,806 189,50011 
18. Buck Creek, N.C. New Work: 
and S.C. Approp. 290,000 - -30,000 - 299,00012 
Cost 11,134 153,341 107,760 5,668 298,167 
19. California Branch New Work: 
S.C. Approp. 41,600 - - - 41,600 
Cost 4,328 289 9 4,143 8,769 
20. Sawmill Branch, S.C. New Work: 
Approp. 19,500 12,000 140,605 100,000 272,105 
Cost 15,349 4,163 14,378 114,354 148,24413 
21. Shot Pouch Creek New Work: 
S.C. Approp. 5,000 - 50,400 4,500 59,900 
Cost 2,527 2,473 5,465 48,482 58,947 
22. Sugar and Briar New Work: 
Creeks, N.C. Approp. - - 70,000 30,000 172,419 
Cost 15,535 447 41,873 22,814 121,590 
23. Turkey Creek, New Work: 
Sumter Co., S.C. Approp. 5,500 10,200 18,300 - 34,00014 
Cost 5,273 10,427 - 16,692 32,393 
1. Excludes $27,900 contributed by State of South Carolina.
2. Includes $109,490 for new work for previous project. 
3. Includes $69,422 for maintenance of previous projects. 
4. Includes $6,586,455 for new work for previous projects. 
5. Includes $401,989 for maintenance of previous projects. 
In addition $600 for maintenance expended from contributed 
funds. 
6. Includes $2,445,852 for new work for previous projects. 
7. Includes $114,556 for maintenance of previous projects. 
8. Includes $4,150 for new work on previous projects. 
9. Excludes contributed funds of $177,578. 
10. Includes $625,000 Recreation Facilities on completed 
projects. 
11. Includes $131,500 expended in 1951. For definite 
project report see FY 1951 Annual Report. 
12. Excludes $36,000 contributed funds. 
13. Excludes $9,042 contributed funds and $858 work in 
kind. 
14. Funds allocated under Section 208 of 1954 F.C. Act. See 
FY 67 Annual Report. 
268

CHARLESTON, S.C., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Auth on Sep. 24, 1969 by Chief of 
Engrs. under Auth of Sec. 107, 
R&H Act of 1960 as amended 
R&H Act of Oct. 27, 1965 
R&H Act of Sept. 19, 1890 
R&H Act of June 13, 1902 
R&H Act of Mar. 2, 1907 
R&H Act of Mar. 2, 1919 
R&H Act of Mar. 3, 1925 
R&H Act of Mar. 3, 1925 
R&H Act of July 3, 1930 
R&H Act of Aug. 30, 19351 
R&H Act of Aug. 30, 19352 
R&H Act of Aug. 30, 19352 
R&H Act of Aug. 26, 1937 
R&H Act of Mar. 2, 1945 
R&H Act of June 18, 1878 
R&H Act of Aug. 8, 1917 
R&H Act of July 18, 1918 
R&H Act of Jan. 21, 1927 
ADAMS CREEK, S.C. (See Section 1 of text) 
Consists of a stable all-tide channel 10 feet deep and 80 feet 
wide extending the distance of 1.45 miles. 
AQUATIC PLANT CONTROL (See Section 2 of text) 
Provides for control and progressive eradication of water 
hyacinth, alligatorweed, Eurasian watermilfoil and other 
obnoxious aquatic plant growths from navigable waters, 
tributary streams, connecting channels, and other allied 
waters of the U.S., in combined interest of navigation, 
flood control, drainage, agriculture, fish and wildlife 
conservation, public health and related purposes, including 
continued research for development of most effective and 
economic control measure in cooperation with other Federal 
and State agencies. 
ATLANTIC INTRACOASTAL WATERWAY BETWEEN 
NORFOLK, VA., AND ST. JOHNS RIVER, FLA. 
(See Section 3 of text) 
Channel from Minim Creek to Winyah Bay. 
Channel from Charleston to a point opposite McClellanville. 
Branch channel to McClellanville. 
Extending the channel to Minim Creek, thence through the 
Estherville-Minim Creek Canal to Winyah Bay. 
Cut across the Santee Delta at Four Mile Creek. 
Widening and deepening the waterway from Charleston to 
Beaufort. 
A waterway 8 feet deep and 75 feet wide from Cape Fear River 
to Winyah Bay. 
Construction of bridges across the waterway in Horry County, 
S. C. 
Cutoff between Ashepoo and Coosaw Rivers. 
Enlarging the channel from Winyah Bay to Charleston, including 
the branch channel to McClellanville, to depth of 10 feet 
and bottom width of 90 feet. 
Increasing dimensions of waterway to 12 feet deep and 90 feet 
wide. 
Anchorage basin 125 feet wide, 335 feet long, 12 feet deep, 
near Myrtle Beach. S.C. 4 
CHARLESTON HARBOR, S.C. (See Section 4 of Text) 
2 jetties 5 
Increase in depth to 30 feet with width of 500 feet between 
the jetties and 1,000 feet seaward thereof. 
The 40-foot channel to the Naval Base. Act provided that the 
40-foot channel should not be undertaken "until the 
proposed new drydocks at this navy yard, carrying a depth of 
40 feet of water over the blocks, has been authorized." 
This dock was authorized in the Naval Appropriation Act 
approved July 1, 1918 (40 Stat. L. 725). 
A 30-foot channel from the sea to Goose Creek via Cooper 
River, together with a 30-foot channel through Town Creek, 
for commercial purposes. The act also provided that the 
40-foot channel be prosecuted only as found necessary for 
national defense. 
Detail Project Report. 
Sec. 302, 1965 River & Harbor 
Act (H. D. 251, 89th Cong., 
1st sess.) 
Annual Report, 1889, p. 1184. 
H. D. 84, 56th Cong., 1st sess. 
and Annual Report, 1900, 
p. 1908. 
Annual Report, 1903, p. 1133. 
H. D. 178, 63d Cong., 1st sess. 
H. D. 237, 68th Cong., 1st sess. 
S. D. 178, 68th Cong., 2d sess. 
H. D. 41, 71st Cong. 1st sess. 
Rivers and Harbors Committee 
Doc. 14, 72d Cong., 1st sess. 
H. D. 129, 72d Cong. 1st sess. 
Rivers and Harbors Committee 
Doc. 11, 72d Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 6, 75th Cong., 1st sess. 3 
H. D. 327, 76th Cong., 1st sess. 
Annual Report 1878, pp. 553-572. 
H. D. 288, 62d Cong., 2d sess. 
H. D. 1966, 64th Cong., 2d sess, 
pt. 1, pp. 21-29, 57, 58, and 
61-63. 
H. D. 249, 69th Cong., 1st sess. 
269 
451-584 0-72-18 
TABLE 7-B

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 7-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
R&H Act of Oct. 17, 1940 
R&H Act of Mar. 2, 1945 
R&H Act of Sept. 3, 1954 
R&H Act of July 14, 1960 
R&H Act of Aug. 13, 1968 
R&H Act of Aug. 5, 1886 
R&H Act of June 25, 1910 
R&H Act of Mar. 2, 1945 
R&H Act of June 30, 1948 
R&H Act of Sept. 3, 1954 
R&H Act of July 3, 1930 
R&H Act of Aug. 20, 1935 
R&H Act of Aug. 26, 19378 
R&H Act of Mar. 2, 1945 
R&H Act of June 14, 1880 
R&H Act of July 3, 1930 
The 35-foot channel depth from the sea to the head of the 
project via Cooper River and Town Creek, also a channel in 
Shem Creek to Mount Pleasant, 110 feet wide and 10 feet deep, 
including a turning basin at the upper end. 
An achorage area 30 feet deep in the water area between 
Castle Pinckney and Fort Moultrie.6 
Deepen the 30-foot channel north and east of Drum Island to 
35 feet. 
Shem Creek Channel modified by extending 1,150 feet upstream 
and downstream from mouth to Atlantic Intracoastal Waterway. 
COOPER RIVER, CHARLESTON HARBOR, S.C. 
(ST. STEPHEN PROJECT) (See Section 5 of text) 
Redivert most of the Santee River waters above Pinopolis Dam 
into the lower Santee River through a canal beginning at 
Lake Moultrie and extending to the Santee River in the 
vicinity of St. Stephen, South Carolina. 
GEORGETOWN HARBOR, S.C. (See Section 6 of text) 
Jetties and earthen dike to protect south jetty. 
Previous project channel dimensions and training wall. 
27-foot channel from ocean, including a turning basin in 
Sampit River. 
Cutoff and side channel in Sampit River. 
PORT ROYAL HARBOR, S.C. (See Section 7 of text) 
A channel from the ocean through Port Royal Sound to Port 
Royal, S.C.; 27 feet deep and 500 feet wide across the ocean 
bar and in Port Royal Sound for approximately 12.7 miles, 
thence 24 feet deep and 300 feet wide in Beaufort River and 
Battery Creek for approximately 8.3 miles to and including a 
turning basin 27 feet deep and 600 feet wide opposite wharf 
of the S.C. State Ports Authority. 
SHIPYARD RIVER, S.C. (See Section 8 of text) 
Channel depths of 12 and 20 feet. 
28-foot channel from Cooper River to the Gulf Oil Corp's 
terminal, and the deepening of the channel above that point 
to 20 feet from the depth of 12 feet previously authorized 
without local cooperation. 
Enlargement of the channel to a depth of 30 feet and a width 
of 200 feet up to the Gulf Oil Corp's terminal, with a 
turning basin 30 feet deep at the latter point. 
Extension of the existing 30-foot channel to vicinity of the 
Pittsburgh Metallurgical Co. plant, with a turning basin at 
the upper end. 
WACCAMAW RIVER, N.C. and S.C. (See Section 9 of text) 
Channel 12 feet deep to Conway and cleared channel, Conway 
to Lake Waccamaw. 
Channel 4 feet deep from Conway to Red Bluff. 
H. D. 259, 76th Cong., 1st sess. 
H. D. 156, 77th Cong., 1st sess. 
S. D. 136, 83d Cong., 2d sess.7 
H. D. 35, 86th Cong., 1st sess. 
River & Harbor Act of 1968, 
S. D. 88, 90th Cong. 
H. Ex. Doc. 258, 48th Cong., 
2d sess., and Annual Report 
1885, pp. 1154-1170, and H. 
Ex. Doc. 117, 50th Cong., 2d 
sess., and Annual Report 1889, 
pp. 1110-1115. 
H. D. 398, 58th Cong., 2d sess., 
and Annual Report 1904, pp. 
1591-1609. 
H. D. 211, 76th Cong., 1st sess. 7 
S. D. 21, 81st Cong., 1st sess. 
River & Harbor Act (H. D. 469, 
81st Cong., 2d sess.) 
Rivers and Harbors Committee, 
Doc. 13, 71st Cong., 2d sess. 
Rivers and Harbors Committee, 
Doc. 43, 73d Cong., 2d sess. 
Rivers and Harbors Committee, 
Doc. 38, 75th Cong. 1st sess. 
H. D. 93, 79th Cong., 1st sess. 9 
S. Ex. Doc. 117, 46th Cong., 
2d sess., and Annual Report 
1880, p. 848. 
H. D. 82, 70th Cong., 1st sess. 9 
270

TABLE 7-B (Continued) 
CHARLESTON, S.C., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized 
Auth. on Nov. 24, 1965 by Chief 
of Engrs. under the auth. of 
Sec 107 of R&H Act of 1960, as 
amended 
R&H Act of Oct. 27, 1965 
Flood Control Act of 
July 24, 1946 
Flood Control Act of 
July 24, 1946 
Flood Control Act of 
July 24, 1946 
Auth. by Chief of Engrs. on 
April 27, 1966, under auth. of 
Sec. 205, 1948 FC Act, as 
amended 
Auth. by Chief of Engrs. on 
Oct. 20, 1966, under auth. of 
Sec. 208, 1954 FC Act, as 
amended 
Auth. of Chief of Engrs. on 
June 20, 1968 under auth. of 
Sec. 205 FC Act of 1948, as 
amended 
Auth. by Chief of Engrs. on 
Aug. 15, 1968 under Sec. 208 
of FC Act of 1954, as amended 
Auth. by Chief of Engrs. on 
Apr. 6, 1966, under auth. of 
Sec. 205, FC Act of 1948, as 
amended 
Auth. by Chief of Engrs. on 
Apr. 14, 1969, under auth. of 
Sec. 205, FC Act of 1948, as 
amended 
VILLAGE CREEK, S.C. (See Section 10 of Text) 
A channel 8 feet deep and 80 feet wide from the mouth of 
Village Creek upstream to Porpoise Fish Company terminal for 
a distance of 2.2 miles. 
HUNTING ISLAND BEACH, S.C. (See Section 15 of text) 
Provides for periodic nourishment for about 10,000 feet of 
beach on the northern part of the island with initial 
placement of 750,000 c.y. of sand for advanced nourishment, 
and construction of one prestressed concrete groin at the 
north end of the island. 
YADKIN RIVER, N.C. (See Section 17 of text) 
Construction of four (4) flood control dams in upper Yadkin 
River basin, two (2) on Yadkin River above Wilkesboro, N.C., 
and two (2) on Reddies River, N.C., a tributary stream. 
W. KERR SCOTT DAM AND RESERVOIR, 
YADKIN RIVER, N.C. (See Section 17A of text) 
Project consists of an earthfill dam 1,740 feet long with 
crest elevation 1,107.5 feet mean sea level, or about 148 
feet above stream bed elevation. 
REDDIES RIVER LAKE, N.C. (See Section 17B of text) 
Reddies damsite is located on the Reddies River at mile 1.7, 
near the town of North Wilkesboro, N.C. 
BUCK CREEK, N.C. and S.C. (See Section 18 of text) 
Excavation of channel of varying sizes ranging from 35 feet 
wide down to 15 feet wide up Buck Creek from the Waccamaw 
River, also excavation up Deep Branch, Camp Swamp and 
Hawkins Branch. 
CALIFORNIA BRANCH, S.C. (See Section 19 of text) 
Provides for channel clearing and snagging about 4.5 miles 
upstream from the Santee Canal. 
SAWMILL BRANCH, S.C. (See Section 20 of text) 
Excavation of a channel of varying sizes ranging from a 
maximum of 35 feet wide to 15 feet wide up Sawmill Branch 
from a point above its confluence with the Ashley River about 
1400 feet below the S.C. Route 642 crossing and extends 
through Summerville to a point 9.0 miles from its 
beginning. 
SHOT POUCH CREEK, SUMTER COUNTY, S.C. 
(See Section 21 of text) 
Channel enlargement of Shot Pouch Creek from Swan Lake to 
Sumter Bypass, with a length of 2.15 miles having bottom 
widths varying from 30 feet wide at the outlet to 14 feet 
wide at the upstream end. 
SUGAR AND BRIAR CREEKS, N.C. (See Section 22 of text) 
Excavation of a 50 foot wide channel up Little Sugar Creek 
from Archdale Road to station 40+41 which is beyond the 
confluence of Little Sugar and Briar Creeks and 40 feet wide 
up to station 228+00 at Randolph Road (end of project). 
TURKEY CREEK, SUMTER COUNTY, S.C. 
(See Section 23 of text) 
Channel enlargement from the Pocotaligo River to a point 4.5 
miles upstream 
Detail Project Report. 
H. D. 323, 88th Cong., 2d sess. 
Flood Control Act. 
Detail Project Report 
Flood Control Act (Public Law 
526, 79th Cong. 2d sess.) 
Detail Project Report. 
Detail Project Report. 
Detail Project Report. 
Detail Project Report. 
Detail Project Report 
Detail Project Report 
271 
Documents

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
1. Included in Public Works Administration program, Sept. 
6, 1933. 
2. Included in Emergency Relief Administration program, 
May 28, 1935. 
3. Contains latest published maps. 
4. Inactive. 
5. Completed under previous projects. 
TABLE 7-C 
6. For national defense. 
7. Contains latest published maps. 
8. Included in Emergency Relief Administration program, 
May 28, 1935. 
9. Contains latest published maps. 
OTHER AUTHORIZED NAVIGATION PROJECTS 
Cost to June 30, 1970 
For Last 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Abbapoola Creek, S.C. 1947 $ - $ - 
Aquatic Plant Control (R&H Act of 1962) 1968 368,700 1 
Ashley River, S.C. 1 
1955 260,996 500,837 
Bereford Creek, S.C. 1947 - - 
Congaree River, S.C.2 1950 364,824 541,860 
Edisto River, S. C.1, 2 1938 33,103 900 
Great Pee Dee River, S.C. 1950 183,712 269,6731'3 
Little Pee Dee River, S.C. 1919 19,550 25,6502,4 
Lumber River, N.C. & S.C. 1897 19,000 - 2 
Lynches River & Clark Creek, S.C. 1910 9,500 - 1 
Mingo Creek, S.C. 1950 29,050 7,1501,2 
Russell Creek, S.C. 1947 - - 
Salkahatchie River, S.C. 1896 15,841 - 1,2,4 
Santee River, N.C. & S.C. 1950 99,750 178,544' 
Wateree River, S.C. 1940 60,000 151,7841,2 
Yadkin River, N.C. 1892 102,809 - 2,4 
1. Completed. 
2. No commerce reported. 
3. Curtailment recommended in 1926 (H. D. 467, 69th 
Cong., 1st sess.). 
4. Abandonment recommended in 1926 (H. D. 467, 69th 
Cong., 1st sess.). 
272 
TABLE 7-B (Continued)

CHARLESTON, S.C., DISTRICT 
TABLE 7-D 
YADKIN RIVER, N. C.: 
DAMS AND RESERVOIRS 
(See Section 17 of Text) 
Design and Cost 
Name River Construction Land Relocations Total 
W. Kerr Scott Dam Yadkin $5,317,806 $1,808,167 $1,487,000 $ 8,612,973' 
and Reservoir 
Reddies River Lake Reddies 8,392,000 2,180,000 128,000 10,700,0002 
1. Actual. 
2. Estimate in 1970. 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
TABLE 7-E Preauthorization Studies Pursuant to Sec. 205 
(See Section 24 of Text) 
Fiscal Year 
Study Identification Costs 
Johns Island, S. C. $ 307 
Kingstree Branch, S. C. 12,252 
Little River, Laurens County, S. C. 27,643 
Saluda River, S. C. 6,476 
Scotts Creek, Newberry, S. C. 9,340 
Soules Swamp, N. C. 971 
273

TABLE 7-F 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last 
Full Report 
See Annual 
Cost to June 30, 1970 
Operation 
and 
Project Report for Construction Maintenance 
Edisto River, S.C. 1,2 1969 $127,660 $ - 
Gapway Swamp, N.C. & S.C. 1 ' ,2 1969 339,197 
1. Authorized by Chief of Engineers. 
2. Completed. 
COMPLETED FLOOD-PLAIN STUDIES 
TABLE 7-G (See Section 27 of Text) 
Location Requesting Data Federal 
Agency Completed Cost 
Abbott Creek, Lexington, N. C. City of Lexington, N. C. Dec. 1964 $12,200 
Salem, Little, Silas, Mill, and Leak City of Winston-Salem, N. C. Apr. 1967 27,800 
Fork Creeks, Winston-Salem, N. C. 
Yadkin River, Elkin, N. C. and Cities of Elkin, N. C., and Aug. 1967 22,000 
Jonesville, N. C. Jonesville, N. C. 
Jeffries Creek, Florence, S. C. City of Florence, S. C. Oct. 1967 18,500 
Lawsons Fork and Fairforest Creeks, City of Spartanburg, S. C. Feb. 1968 35,200 
Spartanburg, S. C. 
Irwin, Long, and Paw Creeks, Charlotte-Mecklenburg June 1968 34,800 
Charlotte-Mecklenburg County, Planning Commission 
N. C. (Volume I) 
Crane Creek and Smith Branch, Richland and Lexington Counties Aug. 1968 31,900 
Richland and Lexington Counties, Joint Planning Commission 
S. C. (Volume I) 
McAlpine and McMullan Creeks, Charlotte-Mecklenburg Planning Oct. 1968 20,000 
Charlotte-Mecklenburg County, Commission 
N. C. (Volume II) 
Congaree and Six Miles Creeks, Richland and Lexington Counties Jan. 1969 23,100 
Richland and Lexington Counties, Joint Planning Commission 
S. C.'(Volume II) 
Hunting Creek and Tributaries, City of Morganton, N. C. July 1969 19,000 
Morganton, N. C. (Volume I) 
Catawba River and Silver Creek, City of Morganton, N. C. Jan. 1970 15,500 
Morganton, N. C. (Volume II) 
Lower Creek, Blair Fork, Long City of Lenoir, N. C. June 1970 25,500 
Branch, Zacks Fork Creek, and 
Zacks Fork Branch, Lenoir, N. C. 
274 
i

SAVANNAH, GA., DISTRICT* 
The district comprises drainage basins tributary to 
the Atlantic Ocean between Port Royal Sound, S.C., 
and Cumberland Sound, Ga. and Fla., including the 
Atlantic Intracoastal Waterway between these points. 
This area covers the headwaters of the Savannah River 
in southwestern North Carolina, a considerable portion 
of western South Carolina, eastern Georgia, and a 
small portion of northeastern Florida. 
IMPROVEMENTS 
Navigation Page 
1. Altamaha, Oconee and Ocmulgee 
Rivers, Ga. ........................................ 275 
2. Aquatic Plant Control (R&H Act of 
1965) ........................................ ..... 276 
3. Atlantic Intracoastal Waterway Between 
Norfolk, Va., and St. Johns River, 
Fla. (Savannah District) ................ 276 
4. Brunswick Harbor, Ga ........................ 277 
5. Savannah Harbor, Ga. .......................... 277 
6. Savannah River Below Augusta, Ga. ..... 278 
7. Other Authorized Navigation Projects ... 279 
Flood Control 
8. Peacock Creek, Liberty County, Ga. ...... 279 
9. Inspection of Completed Flood Control 
Projects ........................................ 280 
10. Other Authorized Flood Control Projects 280 
11. 
Flood Control (cont.) 
Flood Control Work Under Special 
Authorization .............. .................... 
Page 
280 
Multiple-Purpose Projects Including Power 
12. Savannah River Basin, Ga. and S. C. ... 280 
12A. Clark Hill Dam and Lake, Ga. and 
S. . ......................................... 280 
12B. Hartwell Dam and Lake, Ga. and S. C. 280 
12C. Trotters Shoals Dam and Lake, Ga. and 
S. C. ........................................ 281 
13. West Point Lake, Chattahoochee River 
Basin Ga. and Ala. ............................ 281 
General Investigations 
14. Surveys ................................................. 
15. Collection and Study of Basic Data ....... 
16. Research and Development ................... 
281 
281 
281 
NAVIGATION 
1. ALTAMAHA, OCONEE, AND 
OCMULGEE RIVERS, GA. 
Location. These rivers are entirely within the State of 
Georgia. (See U. S. Geological Survey map of 
Georgia.) For full description of these rivers, see page 
636, Annual Report for 1932. 
Previous projects. Prior projects for the Altamaha River 
had been adopted, and expenditures made under them, 
by River and Harbor Acts of March 3, 1881, and 
September 19, 1890; for the Oconee River by River 
and Harbor Acts of June 18, 1878, September 19, 1890, 
and March 3, 1905; for the Ocmulgee River, by River 
and Harbor Acts of August 14, 1876, and September 
19, 1890. 
For further details, see page 1815, Annual Report for 
1915, and page 589, Annual Report for 1938. 
Existing project. The authorized project provides for 
an appropriation of $40,000 annually for the Altamaha, 
Oconee, and Ocmulgee Rivers, to maintain a 
3-foot depth during ordinary summer low water and to 
gradually increase channel depth, so far as practicable 
without sacrificing the maintenance work. This project 
covers the entire Altamaha River (including a channel 
between the river and Darien, Ga.), a length of 137 
miles, the lower 145 miles of the Oconee River, and the 
lower 205 miles of the Ocmulgee River. The Altamaha 
River has a mean tidal range of 6.4 feet at its mouth 
which gradually decreases to mile 33 above, where 
there is no perceptible tidal effect. At Doctortown, mile 
59, ordinary floods attain a height of about 10 feet 
above low water, and extreme floods, a height of about 
15 feet above low water. 
On the Oconee River at Dublin the ordinary 
fluctuations attain a height of 22 feet, and the extreme 
fluctuations a height of 32 feet, above low water. On 
the Ocmulgee River at Macon the ordinary fluctuations 
attain a height of 15 feet, and the extreme 
fluctuations a height of 25 feet, above low water. There 
is no approved estimated cost for improvement or for 
maintenance. 
The existing project was adopted by River and 
Harbor Acts of July 25, 1912 (H. D. 443, 62d Cong., 2d 
sess.), and March 2, 1945 (H. D. 610, 77th Cong., 2d 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
275

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
sess.). The latest published maps of these rivers are in 
the following documents: Altamaha River, House 
Executive Document 283, Fifty-first Congress, second 
session; Oconee River, House Executive Document 
211, Fifty-first Congress, first session; Ocmulgee River, 
House Executive Document 215, Fifty-first Congress, 
first session; and Lower Altamaha River and Darien 
Harbor, Ga., House Document 610, Seventy-seventh 
Congress, second session. 
Local cooperation. Fully complied with. 
Terminal facilities. Along these rivers there are 
numerous natural shore landings which are considered 
ample for existing commerce. Facilities for recreational 
boats have been constructed in recent years at several 
points. 
Operations and results during fiscal year. Maintenance: 
On November 17 hired labor snagging work was 
initiated by crane barge No. 2 with towboat Piasa and 
the snagging was completed on March 20, 1970 at a 
cost of $52,909 including inspection and overhead. 
Other costs incurred, including hired labor, hydrographic 
surveys, mapping of the rivers, and water 
pollution studies, amounted to $46,555. 
Condition at end of fiscal year. The existing project is 
such that the percentage of completion cannot be 
stated. Channel depths have been increased by 
excavating rock shoals and sandbars, by constructing 
contraction and bank-protection works, and by closing 
cutoffs. Navigation has been rendered safer by 
removing obstructions. Many of the closing dams and 
contractions and bank-protection works need repairs. 
During the year: The Altamaha River had a 
controlling depth of 3 feet or greater 65 percent of the 
time; the Oconee River from the Forks to Dublin, Ga., 
had a controlling depth of 2.5 feet or greater 65 percent 
of the time; and the Ocmulgee River from the Forks to 
Abbeville, Ga., had a controlling depth of 3 feet or 
greater 70 percent of the time. 
Low water usually occurs between August and 
December. Controlling depths were then one-half to 1 
foot less than those given above. 
To June 30, 1970, costs under the existing project 
were $60,847 for new work and $1,425,257 for 
maintenance, of which $13,533 were contributed 
funds, a total of $1,486,104. 
2. AQUATIC PLANT CONTROL (RIVER 
AND HARBOR ACT OF 1965) 
Location. Navigable waters, tributary streams, connecting 
channels, and other allied waters in Savannah 
District. 
Existing project. The project provides for control and 
progressive eradication of water-hyacinth, alligatorweed, 
Eurasian water milfoil, and other 
obnoxious aquatic plant growths, from navigable 
waters, tributary streams, connecting channels, and 
other allied waters of the United States, in the 
combined interests of navigation, flood control, 
drainage, agriculture, fish and wildlife conservation, 
public health, and related purposes, including continued 
research for development of most effective and 
economic control measures in cooperation with other 
Federal and State agencies in accordance with report 
of Chief of Engineers, House Document 251, 89th 
Congress, 1st session. The project was authorized by 
section 302, of the 1965 River and Harbor Act (H. D. 
251, 89th Cong., 1st sess.). The act provides that 
research and planning costs shall be borne fully by the 
United States. 
Local cooperation. Local interests must agree to hold 
the United States free from damages that may occur 
from operations performed in connection with this 
project and participate to the extent of 30 percent of 
the cost of the program. Requirements are being met. 
Operations and results during fiscal year. The General 
Design Memorandum for the State of Georgia, entitled 
"Planning for Comprehensive Program for Aquatic 
Plant Control" was updated. 
3. ATLANTIC INTRACOASTAL 
WATERWAY BETWEEN NORFOLK, 
VA., AND THE ST. JOHNS RIVER, FLA. 
(SAVANNAH DISTRICT) 
Location. This 161 mile section of waterway connects 
Port Royal Sound, S. C., with Cumberland Sound, Ga. 
and Fla. (See Coast and Geodetic Survey Charts 838- 
841, inclusive.) 
Previous projects. (Between Savannah, Ga., and 
Fernandina, Fla.) For details see Annual Reports for 
1915 and 1938. 
Existing project. The project provides for a waterway 
12 feet deep at mean low water and not less than 90 feet 
wide between Port Royal Sound, S.C., and Savannah, 
Ga.; 12 feet deep at mean low water, with widths of 90 
feet in landcuts and narrow streams and 150 feet in 
open waters, between Savannah, Ga., and Cumberland 
Sound, Ga. and Fla.; and a suitable anchorage 
basin at Thunderbolt, Georgia. Mean tidal range 
between Port Royal, S. C., and Cumberland Sound, 
Ga. and Fla., is from 6 to 8 feet, with fluctuations from 
1 1/2 to 2 1/2 feet, due to winds and lunar phases. (See 
table 8-B for Authorizing Legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Exclusive of adequate terminal 
facilities at ports of entry, this improvement serves 
numerous wharves, some of which are open to the 
public on equal terms. Facilities are considered ample 
for existing commerce. 
Operations and results during fiscal year. Maintenance: A 
lump sum contract was awarded June 17, 1969 for 
maintenance dredging. The pipeline dredge Cherokee 
removed 487,758 cubic yards of material from the main 
route of the waterway at South River, Little Mud 
River, North River, Doboy Sound, Hell Gate, 
Wilmington River, and Elba Island Cut, at a total cost 
of $165,974. A combined contract for Atlantic 
Intracoastal Waterway and Brunswick Harbor was 
awarded May 28, 1970, and work was initiated June 
15, 1970 for maintenance dredging. The contract 
276

SAVANNAH, GA., DISTRICT 
pipeline dredge Cherokee removed 167,770 cubic yards 
of material from the main route of the waterway at 
Creighton Narrows and South River during the period 
June 15 to June 30, 1970 at a cost of $72,480. 
Construction of spoil dikes was performed by Government 
plant and hired labor during the fiscal year at 
a cost of $2,368. Project condition surveys, condition 
studies, water pollution studies, and other Government 
cost amounted to $64,568. 
Condition at end of fiscal year. The main channel of the 
existing project, completed in 1941, is maintained at 12 
feet. Along the main route, a minimum depth of 11 feet 
was recorded in St. Augustine Creek, Wilmington 
River, Hell Gate, and Bear River. The former main 
channel, now an alternate route through the westerly 
end of the South Channel and northerly end of 
Wilmington River, will be maintained to a depth of 7 
feet mean low water for traffic points north and south 
of Savannah Harbor. 
Costs of the existing completed project to June 30, 
1970, were $763,599 for new work and $7,104,601 for 
maintenance, a total of $7,868,200. 
4. BRUNSWICK HARBOR, GA. 
Location. The Harbor entrance is 70 statute miles 
south of the entrance to Savannah Harbor, Ga., and 25 
statute miles north of the entrance to Fernandina 
Harbor, Florida. (See Coast and Geodetic Survey 
Chart 447.) 
Previous projects. For details see Annual Reports for 
1915 and 1938. 
Existing project. The project provides for a stone jetty 
4,350 feet long at the entrance to East River and the 
following channels: 32 feet deep and 500 feet wide 
across the bar; 30 feet deep and 400 feet wide through 
St. Simon Sound, Brunswick River, and East River to 
the foot of Second Avenue; 30 feet deep and 300 feet 
wide in Turtle River to the Allied Chemical Co. wharf, 
formerly the Atlantic Refining Co.; 27 feet deep and 
350 feet wide in East River from Second Avenue to its 
confluence with Academy Creek; 24 feet deep and 150 
feet wide in Academy Creek; and a cut from Academy 
Creek to Turtle River, if decided advisable; a channel 
in Back River 20 feet deep and 150 feet wide from St. 
Simon Sound to the mouth of Mill Creek; and a 
channel in Terry Creek 10 feet deep and 80 feet wide 
from its mouth to a point immediately above the wharf 
of Glynn Canning Company. All depths refer to mean 
low water. Mean tidal range on the bar is 6.5 feet, at 
the city of Brunswick 7.3 feet, and 7.6 feet at the upper 
end of the harbor. The existing project was authorized 
by six River and Harbor Acts between 1879 and 1950. 
In general, the current project is covered by the 1950 
River and Harbor Act (H. D. 110, 81st Cong., 1st sess.). 
For further details see Annual Report for 1962. 
Local cooperation. Complied with to date. 
Terminal facilities. Twenty-six wharves and piers, 
almost all privately owned, have a berthing space of 11, 
4444 feet. In addition, the Port of Brunswick and the 
State of Georgia constructed a transit shed and modern 
docks with 1,500 feet of aprons on East River at a cost 
of over $1,300,000. For further details see Port Series 
No. 16, Corps of Engineers (revised 1954). 
Operations and results during fiscalyear. Maintenance: A 
combined contract was awarded June 13, 1969 for 
maintenance dredging of East River, construction of a 
closure dam in East River, and construction of spoil 
dikes on Andrews Island. Work was initiated July 8, 
1969 and completed November 12, 1969. Construction 
of the closure dam and spoil dikes cost $329,317 and 
$390,000, respectively; maintenance dredging by the 
contract dredge Arlington removed 295,068 cubic yards 
of material in East River at a cost of $88,840, for a total 
contract cost of $808,157. A combined contract for the 
Atlantic Intracoastal Waterway and Brunswick 
Harbor was awarded May 28, 1970 for maintenance 
dredging of Brunswick Harbor. The U. S. hopper 
dredge Hyde dredged October 14 to November 12, 1969 
and removed 127,970 cubic yards of material from the 
bar channel at a cost of $140,619. The U. S. hopper 
dredge Gerig dredged May 22 to June 18, 1970 and 
removed 415,723 cubic yards from the bar channel at a 
cost of $259,473. 
Costs for existing completed project to June 30, 1970 
were $12,073,993, of which $3,433,743 was for new 
work and $8,640,250 for maintenance. 
Routine condition surveys, water and air pollution 
studies, Government supervision and administration, 
engineering and design, and engineering investigations 
in connection with model studies cost $72,399. 
Condition at end of fiscal year. The existing project was 
completed in December 1960. General condition of the 
harbor works is satisfactory, providing maintenance 
dredging continues. Minimum readings of authorized 
project depths were: In 32-foot channel, 30 feet on St. 
Simon Range; in 30-foot channel, 28 feet on Brunswick 
Cut Point Range; in 27-foot channel, 17 feet above 
Second Avenue. Costs for existing completed project to 
June 30, 1970, were $12,060,393, of which $3,420,143 
was for new work and $8,640,250 for maintenance. 
5. SAVANNAH HARBOR, GA. 
Location. Harbor entrance is 75 statute miles south of 
Charleston Harbor, S.C., and 70 statute miles north of 
Brunswick Harbor, Ga. (See Coast and Geodetic 
Survey Chart 440.) 
Previous projects. For details see Annual Reports for 
1915 and 1938. 
Existing project. The project provides for a channel 40 
feet deep and 600 feet wide across the ocean bar about 
7.0 miles; 38 feet deep and 500 feet wide to the 
Seaboard Coast Line terminal; 38 feet deep and 400 
feet wide to the vicinity of Garden City (Georgia Ports 
Authority terminal); and 36 feet deep and 400 feet 
wide to the vicinity of Savannah Sugar Refining Corp., 
about 22.6 miles; and 30 feet deep and 200 feet wide to 
277

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
a point 1,500 feet below the Atlantic Coastal highway 
bridge, about 1.5 miles, a total length of 31.1 miles; 
three turning basins 34 feet deep by 900 feet wide by 1, 
000 feet long in the vicinity of the Seaboard Coast Line 
terminal, American Oil Company terminal, and 
Garden City terminal of the Georgia Ports Authority; 
two turning basins 30 feet deep by 600 feet wide by 600 
feet long near Savannah Sugar Refining Corporation 
terminal and at the extreme upper limit of the project 
near Continental Can Company terminal. The project 
also provides for sediment control works consisting of a 
tide gate structure across Back River; a sediment basin 
40 feet deep, 600 feet wide, about 2 miles long, with an 
entrance channel 38 to 40 feet deep and 300 feet wide; 
a drainage canal across Argyle Island 15 feet deep and 
300 feet wide; control works and canals for supplying 
fresh water to the Savannah National Wildlife Refuge; 
and facilities to mitigate damages to presently 
improved areas other than refuge lands. Mean range of 
tide is 7.8 feet at the upper end of the harbor and 6.9 
feet at the lower end. Extreme ranges are about 11.1 
and 10.7 feet, respectively. The existing project was 
authorized by 14 River and Harbor Acts from 1907 
through 1965. In general, the River and Harbor Act of 
1965 covers the principal features of the existing 
project. Latest approved estimate of total Federal Cost 
for new work modification (approved May 1970) is 
$18,002,000 ($9,672,000 for the Widening and 
Deepening of Channels and Turning Basin which 
includes $192,000 U. S. Coast Guard costs, and $8,330, 
000 for the Sediment Basin and Appurtenant Works). 
Estimated local cost for Widening and Deepening is 
$367,000 and for the Sediment Control Works is $455, 
000. 
Local cooperation. Local interests must provide suitable 
spoil areas and retaining dikes for construction and 
future maintenance of the project. The Chatham 
County Commissioners, as local assurers, have met all 
requirements to date. 
Terminal facilities. Fifty piers and wharves adequately 
serve existing waterborne commerce of the port. These 
facilities, with use of dolphins, have a combined 
berthing space of 28,400 feet with water depths 
alongside ranging up to 34 feet at mean low water. All 
have railway and highway connections. For further 
details, see Port Series No. 14, Corps of Engineers 
(revised 1954) and Annual Report for 1962. 
Operations and results during fiscal year. New work: 
Engineering and design of authorized modifications 
continued during the year. Activities in connection 
with the Sediment Basin and Appurtenant Works 
Modification included completion of Design Memorandum 
No. 3, Sediment Basin: Fresh Water Control 
Plan and Appurtenances. Plans and specifications for 
the Sediment Basin, Drainage Canal, and Hydraulic 
Fill were completed. Plans and specifications for the 
Tide Gate Structure and Access Road, Fresh Water 
Control Structures and Canals, and Fresh Water 
Diversion Channels are approximately 82, 77, and 7 
percent complete, respectively. Plans and specifications 
for dredging the upper inner harbor and Marsh Island 
Turning Basin were completed, work advertised, and 
bids opened May 14, 1970; however the low bidder, 
Hendry Corporation; Tampa, Florida, exceeded award 
authority. Subsequently, the low bidder claimed an 
error was made in the bid which, if corrected, would be 
within award authority. 
Maintenance: The U.S. hopper dredge Gerig 
dredged the bar channel during April 24, 1970 to May 
21, 1970 and removed 565,329 cubic yards of material 
at a cost of $317,928, including other government costs. 
The U.S. pipeline dredge Henry Bacon dredged the 
inner harbor during July 1 to July 17, 1969, August 4, 
1969 to May 3, 1970 and June 20 to June 30, 1970 and 
removed 4,618,197 cubic yards of material at a cost of 
$1,072,430, including other government costs. The 
project received $47,459 from private shipping interests 
to reimburse the government for having to remove silt 
material placed by them within the project limits of the 
inner harbor. The material is the result of agitation 
dredging by private owners of slips in wharf areas in an 
effort to maintain adequate depths for their private 
docking facilities. Dragging and sweeping operations in 
the inner harbor cost $14,906. Maintenance of spoil 
dikes by Government draglines amounted to $10,737, 
including other costs. Condition surveys, floculation 
studies, water and air pollution studies, inspections and 
reports, and government supervision and administrative 
costs were $137,652. 
Condition at end of fiscal year. The existing project is 
incomplete. Training walls, jetties, and other structures 
are in fair condition. Authorized channels are 
maintained by a planned dredging program with work 
at critical areas when necessary. Minimum readings 
from depths authorized were: In 40-foot channel, 36 
feet at Tybee Knoll; in 38-foot channel, 32 feet at City 
Front and Marsh Island; in 36-foot channel, 24 feet at 
Port Wentworth. Costs of existing project to June 30, 
1970, were $12,537,780 for new work and $45,457,573 
for maintenance, a total of $57,995,353. 
6. SAVANNAH RIVER BELOW AUGUSTA, 
GA. 
Location. Savannah River is formed by the confluence 
of the Tugaloo and Seneca Rivers on the boundary line 
between South Carolina and Georgia. It flows 
southeast 314 miles, forming the boundary line 
between the two states, and empties into the Atlantic 
Ocean 16.6 miles below Savannah, Ga. (See Geological 
Survey maps of South Carolina and Georgia.) 
Previous project. For details see Annual Reports for 
1915 and 1938. 
Existing project. The authorized project provides for a 
channel 9 feet deep and 90 feet wide (at ordinary 
summer flow of 5,800 second-feet at Augusta, Ga.) 
from the upper end of Savannah Harbor to the head of 
navigation at Augusta, 3 miles above Fifth Street 
278

SAVANNAH, GA., DISTRICT 
Bridge, a total distance of about 199 miles. Improvement 
is to be obtained by construction of 
contraction works, closure of cutoffs, bank protection, 
dredging, removal of snags, overhanging trees and 
wrecks, and open-river regulation. Mean tidal variation 
at the mouth of the river is 7 feet. Freshet 
variation above the normal pool level (elevation 114.5 
mean sea level) of New Savannah Bluff lock and dam 
at mile 203 is ordinarily about 13 feet with an extreme 
of 34 feet. Latest approved project cost estimate for 
providing a 9-foot channel (Sept. 1963) is $6,576,000 
exclusive of amounts expended on previous projects. 
Recreation facilities at New Savannah Bluff lock and 
dam cost $17,000. Existing project was authorized by 
seven River and Harbor Acts between 1890 and 1950 
and is generally as authorized by 1950 River and 
Harbor Act (S. D. 6, 81st Cong., 1st sess.). For further 
details see Annual Report for 1962. 
Local cooperation. Complied with to date. The City 
Council of Augusta, Ga., and the Georgia and South 
Carolina Ports Authorities have agreed to act as local 
assurer. 
Terminal facilities. The only water terminals served by 
this improvement are at Augusta, Sylvania, and at or 
near Savannah. Augusta provided a municipal dock 
valued at $50,000 and Georgia Ports Authority 
constructed a State port at Augusta, Ga., costing about 
$418,000. These facilities were expanded in 1965 at an 
additional cost of about $250,000. In addition, Pure Oil 
Co., Texaco, Inc., and Merry Brothers Brick and Tile 
Co. maintain terminals below Augusta, and Allied 
Chemical Co. maintains terminal at Sylvania. These 
are supplemented by natural landings along river and 
extensive facilities at Savannah. 
Operations and results during fiscal year. Maintenance: 
The contract pipeline dredge Ideal removed 238,835 
cubic yards of material during fiscal year at cost of 
$205,173, including government costs. A continuing 
contract for construction of bank revetments was 
awarded April 23, 1970 for $86,947. Costs generated to 
end of fiscal year for this contract amounted to $12,749, 
including Government costs. A maintenance pipeline 
dredging contract was awarded in the latter part of the 
fiscal year, June 26, 1970, in the amount of $72,100. 
Expenditures incurred for this work consisted of 
Government costs for plans and specifications, etc., 
which amounted to $8,512. The U. S. crane barge No. 
2 with towboat Piasa accomplished five months of 
snagging at a cost of $53,039 from July 1, 1969 through 
September 5, 1969 and March 25, 1970 through June 
30, 1970. Routine operation of the Lock and Dam, 
including water and air pollution studies, inspections 
and reports, and government supervision and administration 
cost $82,506. Other Government cost 
amounted to $7,920. 
Condition at end of fiscal year. In general, open-channel 
works are in good condition. Project depth of 9 feet was 
maintained 80 percent of fiscal year, with a minimum 
depth of 7 feet recorded at mile 43. Costs of existing 
project to June 30, 1970, were $11,720,491 of which $6, 
646,551 was for new work and $5,073,940 for 
maintenance. 
7. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See Table 8-C.) 
FLOOD CONTROL 
8. PEACOCK CREEK, LIBERTY COUNTY, 
GA. 
Location. Peacock Creek is located in the eastern 
portion of Liberty County and empties into the 
Atlantic Ocean through North Newport River. 
Peacock Creek and tributaries drain a portion of the 
Fort Stewart Military Reservation and sizeable 
swamps in the vicinity of Hinesville, Flemington, and 
McIntosh, Georgia. 
Existing project. The authorized plan of improvement 
provides for channel clearing and excavation of 
approximately 6.8 miles on Peacock Creek, 3.3 miles 
on Captain Fleming Swamp, 4.8 miles on the main 
stem of Melvin Swamp, 4.2 miles on the minor stems of 
Melvin Swamp, 3.6 miles on the main stem of Goshen 
Swamp, and 1.7 miles on the minor stems of Goshen 
Swamp. Adequate waterway openings beneath state, 
Federal, and county maintained roads and lateral and 
on-farm drainage will be provided by local interests. 
Local cooperation. Local interests must (a) provide, 
without cost to the United States, all lands, easements, 
rights-of-way, utility relocations and alternations, 
waterway openings beneath roads, and highway or 
highway bridge construction and alterations necessary 
for project construction; (b) hold and save the United 
States free from damages due to the construction works, 
and adjust all claims concerning water rights; (c) 
maintain and operate the project, after completion, 
without cost to the United States, in accordance with 
regulations prescribed by the Secretary of the Army; 
(d) prevent future encroachment which might interfere 
with proper functioning of the project for flood control. 
Local interests have furnished assurances that they 
will comply with the requirements of local cooperation. 
The County Commissioners of Liberty County indicate 
they will assist in every way possible to see that 
property owners construct the necessary lateral ditches 
on their property to assure the success of the project. 
The City of Hinesville and the Liberty County Board 
of Commissioners have requested the Corps of 
Engineers to perform the engineering and design work 
for which they are responsible, on a reimbursable basis. 
Operations and results during fiscal year. Plans and 
specifications for the proposed improvements were 
initiated January 15, 1970. 
Condition at end of fiscal year. Plans and specifications 
are about 15 percent complete. 
279

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
9. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Physical inspections of the Augusta and Macon 
levees were made during the fiscal year. Cost for fiscal 
year was $1,798. 
10. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 8-D.) 
11. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 
858, 80th Congress, as amended (preauthorization) 
Fiscal year costs of $97,204 for preauthorization 
studies were as follows: Bay Gall Creek, Ga., $61,322; 
Cedar Creek 3,839; Shoal and Cobb Creeks, $105; 
Little McMullen Creek, Ga., $12,818; Walnut Creek, 
Ga., $340; Trail Creek, $5,149; and Dunn Branch, 
Ga., $13,631. 
The following studies were completed during the 
fiscal year: Shoal and Cobb Creeks, Cedar Creek, and 
Hunnicutt Branch. 
Snagging and Clearing of Navigable Streams and Tributaries 
in Interest of Flood Control (Section 208 of 1954 Flood Control 
Act, Public Law 780, 83d Congress.) 
Fiscal year costs of $13,631 were incurred for a study 
of Dunn Branch for flood control (Snagging & 
Clearing) pursuant to Section 208 of above cited act. 
Emergency flood control activities-repair, flood fighting, and 
rescue work, (Public Law 99, 84th Cong., and antecedent 
legislation.) 
Revisions to emergency manuals, emergency planning, 
and other expenditures cost $10,762. 
MULTIPLE-PURPOSE PROJECTS 
INCLUDING POWER 
12. SAVANNAH RIVER BASIN, GA. AND 
S.C. 
Location. Works covered by this project consist of a 
series of 11 dams and lakes on Savannah River and its 
tributaries in Georgia and South Carolina. (See 
Geological Survey maps of Ga. and S.C.) 
Existing project. The Flood Control Act of 1944 
approved the general plan for comprehensive development 
of the Savannah River Basin for flood 
control and other purposes (H. D. 657, 78th Cong., 2d 
sess.) and authorized construction of the Clark Hill 
Project on the Savannah River in Georgia and South 
Carolina as the initial step of this development. The 
Flood Control Act of 1950 authorized construction of 
Hartwell Lake under the general plan. Trotters Shoals 
which will replace Goat Island and Middleton Shoals 
was authorized for construction by the Flood Control 
Act of 1966 at an estimated cost of $84,900,000. Clark 
Hill and Hartwell Lakes are the only projects in the 
comprehensive plan that have been constructed. (See 
table 8-E on dams and lakes at end of chapter.) 
Duke Power Company has a Federal Power 
Commission license to construct Newry-Old Pickens 
Project and Jocassee Project located further upstream. 
Individual reports on Clark Hill, Hartwell, and 
Trotters Shoals Lakes follow. 
Local cooperation. None required. 
12A. CLARK HILL DAM AND LAKE, GA. 
AND S. C. 
Location. Clark Hill Dam is located at mile 237.7 on 
Savannah River about 22 miles upstream from 
Augusta, Ga. (See Geological Survey maps of Georgia 
and South Carolina.) 
Existing project. The Flood Control Act of 1944 
approved the general plan for development of the 
Savannah River Basin (H. D. 657, 78th Cong., 2d sess.) 
and authorized construction of Clark Hill Dam and 
Lake final cost of which was $79,153,000. The dam has 
a concrete section 2,282 feet long with a maximum 
height of 200 feet, and a controlled spillway 1,096 feet 
long. The concrete section is flanked on the west side by 
a rolled-earth embankment of 2,069 feet, and on the 
east side by a similar embankment of 1,329 feet. Total 
length of the dam is 5,680 feet. At maximum power 
pool elevation 330, the lake covers 70,000 acres. It 
provides a total storage capacity of 2,900,000 acre-feet 
allocated as follows: flood control 390,000 acre-feet; 
hydroelectric power 1,045,000 acre-feet; and dead 
storage 1,465,000 acre-feet. Seven 40,000-kilowatt 
generators have a combined generating capacity of 
280,000 kilowatts, with combined average total annual 
output of 700 million kilowatt-hours of electrical 
energy. 
Local cooperation. None required. 
Operations and results during fiscal year. New work: Cost 
of recreational activities during the fiscal year from 
construction funds (Code 710) amounted to $159,907. 
Gross generation of electric energy for the fiscal year 
was 533,000,000 kilowatt hours, most of which was 
delivered to the Southeastern Power Administration. 
Flood damages prevented amounted to $30,000. 
Maintenance: Operation and maintenance costs 
during the fiscal year amounted to $863,075. 
Condition at end of fiscal year. Construction is complete 
except for providing additional recreational 
development. 
12B. HARTWELL DAM AND LAKE, GA. AND 
S.C. 
Location. Hartwell Dam is on the Savannah River 
305 miles above its mouth and 89 miles upstream from 
Augusta, Georgia. (See Geological Survey maps of Ga. 
and S.C.) 
Existing project. The Flood Control Acts of 1950 and 
1958 authorized $50 million and $44.3 million, 
280

SAVANNAH, GA., DISTRICT 
respectively, for constructing Hartwell Lake included 
in the general plan for comprehensive development of 
Savannah River Basin as approved by the 1944 Flood 
Control Act (H. D. 657, 78th Cong., 2d sess.). The dam 
is a concrete gravity-type structure, 1,900 feet long with 
a maximum height of 204 feet and a controlled 
spillway 568 feet in length. The concrete section is 
flanked on the east and west abutments by earth 
embankments totaling 113,390 feet in length and by a 
saddle dike 2,590 feet long also on the west side. Total 
length of the dam is 17,880 feet. At maximum power 
pool elevation of 660 feet the lake covers 55,950 acres. 
Total capacity of the lake is 2,843,000 acre-feet of 
storage allocated as follows: flood control 293,000 acrefeet; 
hydroelectric power 1,416,000 acre-feet; and dead 
storage 1,134,000 acre-feet. Four 66,000-kilowatt 
generators having generating capacity of 264,000 
kilowatts have been installed. A fifth generator is 
planned for installation in the future which would then 
provide a total generating capacity of 330,000 
kilowatts. Latest approved project estimate (Aug. 
1968) is $88,300,000. 
Local cooperation. None required. 
Operations and results during fiscal year. New work: Cost 
of activities during the fiscal year amounted to $75,367 
expended from Construction General funds of which 
$3,110 was from Code 600 funds and $72,257 was from 
Code 710 funds. Work consisted of construction of 
miscellaneous recreational facilities. Code 600 funds 
were utilized for real estate activities. Gross generation 
of electrical energy for the fiscal year amounted to 361, 
000,000 kilowatt hours, most of which was delivered to 
the Southeastern Power Administration. Flood damages 
prevented during the year amounted to $10,000. 
Maintenance: Operation and maintenance cost 
during the fiscal year amounted to $838,398. 
Condition at end of fiscal year. Construction is complete 
except for providing additional recreational 
development. 
12C. TROTTERS SHOALS DAM AND LAKE, 
GA. AND S.C. 
Location. Trotters Shoals Dam is on the Savannah 
River 275.1 miles above its mouth, 29.9 miles below 
Hartwell Dam, and about 37.4 miles above Clark Hill 
Dam. (See Geological Survey maps of Ga. and S.C.) 
Existing project. The Flood Control Act of 1966 (S. D. 
52, 89th Cong., 1st sess.) authorized construction of 
Trotters Shoals Dam and Lake substantially in 
accordance with the recommendations of the Chief of 
Engineers at an estimated cost of $84,900,000. The 
latest approved (1970) cost estimate for the project is 
$118,000,000, of which $94,681,000 is for construction, 
$10,062,000 for lands and damages, and $13,257,000 
for engineering and design and supervision and 
administration. 
Operations and results during fiscal year. New work: Preconstruction 
planning for the project continued during 
the year and is scheduled for completion during fiscal 
year 1971. Design Memoranda completed during the 
year were: General Design Memorandum, and Pre- 
Impoundment Survey Technical Studies Work Plan, 
Access Roads, and Construction Facilities. Status of 
other work in progress: Design Memorandums on 
Land Requirements Plan-Public Use, 28 percent 
complete; Geology, 32 percent complete; Earth 
Embankments, 9 percent complete; Concrete Dam 
and Diversion Works, 65 percent complete; Relocation 
of State Route 72, 32 percent complete; Relocation of 
Seaboard Coast Line Railroad, 21 percent complete; 
Construction Materials, 15 percent complete; Real 
Estate-Construction Area, 50 percent complete; and 
Turbines, Governors, and Generators, 10 percent 
complete. Plans and specifications for Access Roads are 
2 percent complete and the Model Study-Spillway; 
being done by the Waterways Experiment Station, 
Vicksburg, Mississippi; is 65 percent complete. 
13. WEST POINT LAKE, 
CHATTAHOOCHEE RIVER BASIN, GA. 
AND ALA 
The West Point project located on the Chattahoochee 
River, 2.8 miles upstream from West Point, 
Ga., was authorized by the Flood Control Act of 1962 
(H. D. 570, 87th Cong., 2d sess.). The project is to be 
designed and constructed for flood control, power, 
recreation, fish and wildlife development and streamflow 
regulation for downstream navigation. It is 
being designed and constructed by Savannah District 
for Mobile District. For complete information see 
Mobile District. 
GENERAL INVESTIGATIONS 
14. SURVEYS 
Fiscal year cost was $188,974, of which $24,364 was 
for navigation studies; $147,328 for flood control 
studies; $13,266 for beach erosion studies; and $1,016 
for review of watershed studies from other agencies; 
and $3,000 for National Shoreline Study. 
15. COLLECTION AND STUDY OF BASIC 
DATA 
Work was continued under the Flood Plain 
Management Services on the compilation of information 
of floods and potential flood damages, 
including identification of those areas subject to 
inundation. Fiscal year expenditures for these activities 
were as follows: Aiken County, S.C., $1,007; Athens 
and Clarke County, Ga., $6,138; Savannah and 
Chatham County, Ga., $5,203; DeKalb County, Ga., 
$423; metropolitan Atlanta, $33,787; Waycross and 
Ware County, Ga., $3,676; Macon and Bibb County, 
Ga., $35,499; and management and technical services, 
$60,564. (See table 8-F for flood plain studies 
completed to date.) 
16. RESEARCH AND DEVELOPMENT 
Hydrologic studies during the fiscal year cost $5,846. 
281

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 8-A 
See 
Section 
in Text Project 
1. Altamaha, Oconee 
and Ocmulgee Rivers, 
Georgia 
2. Aquatic Plant 
Control (1965 
R&H Act) 
3. Atlantic Intracoastal 
Waterway between 
Norfolk, Va., and 
the St. Johns River, 
Florida 
4. Brunswick Harbor, 
Georgia 
5. Savannah Harbor, 
Georgia 
6. Savannah River 
below Augusta, 
Georgia 
8. Peacock Creek, 
Liberty County, 
Georgia 
9. Inspection of 
Completed Flood 
Control Works 
12A. Clark Hill Dam 
and Lake, Georgia 
and South Carolina 
12B. Hartwell Dam and 
Lake, Georgia and 
South Carolina 
12C. Trotters Shoals 
Dam and Lake, 
Georgia and South 
Carolina 
Funding 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY 67 FY 68 FY 69 FY 70 June 30, 1970 
50,000 
44,612 
2,000 
514 
140,000 
303,508 
451,000 
449,797 
480,000 
118,712 
1,165,000 
1,164,419 
425,000 
210,415 
20,103 
1,000 
472 
125,000 
91,587 
726,300 
673,446 
-475,000 
-547,124 
870,800 
648,206 
40,000 
50,102 
11,000 
896 
235,000 
240,193 
390,000 
494,253 
1,600,000 
1,137,765 
1,314,853 
1,208,292 
170,000 
344,274 
18,896 
1,000 
1,065 
128,130 
122,445 
766,291 
912,474 
145,000 
163,780 
582,000 
778,561 
300,000 
219,850 
50,000 
49,188 
4,902 
102,260 
99,464 
1,835 
395,000 246,451 
236,939 305,390 
1,340,000 578,069 
562,188 1,280,648 
1,373,000 -72,000 
1,759,267 79,099 
1,345,400 1,546,536 
1,442,499 1,553,653 
469,000 361,174 
337,504 369,899 
- 27,500 
1,388 10,293 
1,000 1,078 
927 1,798 
50,000 223,000 
90,000 159,907 
700,200 900,205 
709,980 863,075 
50,000 89,000 
91,550 75,367 
770,000 876,609 
826,545 838,398 
485,000 900,000 
541,749 604,163 
821,4571 
821,4571 
1,527,2822 
1,523,6742'3 
13,000 
8,147 
958,0964 
958,0964 
7,338,5215 
7,239,3995 
4,063,6086 
4,063,6086 
8,778,7017 
8,694,664 
20,084,3218 
19,798,1648 
45,760,4159 
45,756,467 
6,740,031 10 
6,740,03110 
5,251,350 
5,073,940 
72,467 
55,238 
10,418 
10,403 
80,003,70611 
79,940,613" 
10,123,803 
10,071,298 
88,357,00712 
88,316,97112 
5,216,809 
5,162,368 
1,685,000 
1,365,762 
282

SAVANNAH, GA., DISTRICT 
COST AND FINANCIAL STATEMENT 
1. Includes $760,610 for previous projects. 
2. Includes $111,950 for previous projects. 
3. Excludes $13,533 contributed funds. 
4. Includes $194,497 for previous projects. 
5. Includes $134,798 for previous projects. 
6. Includes $643,465 for previous projects and includes 
$97,521 expended from Public Works Funds for existing project. 
Excludes $10,000 contributed funds. 
7. Includes $54,414 for previous projects. Includes $4,995 
expended from Public Works Funds for existing project. 
TABLE 8-B 
8. Includes $7,260,384 for previous projects. Excludes 
$46,847 for removal of sunken vessels. Excludes $303,248 
contributed funds. 
9. Includes $298,894 for previous projects. Excludes 
$197,596 contributed funds. 
10. Includes $93,480 for previous projects. Includes 
$1,634,562 from Public Works Fund. 
11. Excludes $391,273 accelerated Public Works Funds. 
Includes $847,400 Code 710 funds. 
12. Excludes $276,201 accelerated Public Works Funds. 
Includes $609,205 Code 710 funds. 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
ATLANTIC INTRACOASTAL WATERWAY BETWEEN 
NORFOLK, VA., AND ST. JOHNS RIVER, FLA. 
(SAVANNAH DISTRICT) (See Section 3 in text) 
R&H Act of June 3, 1896 Section from Beaufort, S.C. to Savannah, Ga. Route No. 2 H. D. 295, 53d Cong., 3d sess. 
adopted. 
R&H Act of Mar. 3, 1899 Route No. 1 adopted. H. D. 295, 53d Cong., 3d sess.1 
R&H Act of July 13, 1892 Section from Savannah, Ga. to Fernandina, Fla. Original H. D. 41, 52d Cong., I1st sess. 
7-foot channel. 
R&H Act of Mar. 3, 1905 Provided for Skidaway Narrows. H. D. 450, 58th Cong., 2d sess. 
R&H Act of July 25, 1912 Incorporated alternative routes previously improved as H. D. 1236, 60th Cong., 2d sess.1 
separate projects and the auxiliary channels. 
R&H Act of Aug. 8, 1917 Section from Cumberland Sound, Ga. and Fla. to St. Johns 
River, Fla. Consolidation of the 3 sections shown above, 
into "Waterway between Beaufort, S.C. and St. Johns River, 
Fla." 
R&H Act of Mar. 2, 1919 Section from Beaufort, S.C. to Cumberland Sound, Ga., and H. D. 581, 63d Cong., 2d sess.1 
Fla. Removing logs and snags from Generals Cut. 
R&H Act of Mar. 2, 1919 Improving Back River to provide a channel 7 feet deep and H. D. 1391, 62d Cong., 3d sess. 
150 feet wide. 
R&H Act of Mar. 3, 1925 Channel 75 feet wide between Beaufort, S.C. and Savannah, Ga. S. D. 178, 68th Cong., 2d sess. 
R&H Act of July 3, 1930 Channel from Baileys Cut to Dover Creek. S. D. 43, 71st Cong., 2d sess. 1 
R&H Act of Aug. 26, 1937 A 7-foot protected channel around St. Andrews Sound. Senate committee print, 74th 
Cong., 1st sess. 
R&H Act of Aug. 26, 1937 A 12-foot channel between Beaufort, S.C. and Savannah, Ga. via Rivers and Harbors Committee 
Beaufort River and Port Royal Sound. Doc. 6, 75th Cong., 1st sess. 
R&H Act of June 20, 1938 A 12-foot channel between Savannah, Ga. and Fernandina, Fla., H. D. 618, 75th Cong., 3d sess. 
various cutoffs; and anchorage basin at Thunderbolt, Ga. 
R&H Act of Mar. 2, 1945 An alternate route 9 feet deep and 150 feet wide in that part H. D. 114, 77th Cong., 1st sess. 
of Frederica River, Ga., not now traversed by the main route, 
at no additional cost to the United States. 
1. Contains latest published maps. 
283 
TABLE 8-A (Continued)

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 8-C OTHER AUTHORIZED NAVIGATION PROJECTS 
Cost to June 30, 1970 
For last 
Full report Operation 
See Annual and 
Project Report for Construction Maintenance 
Aquatic Plant Control (R&H Act 1962)2 1968 $ 25,700 $ - 
Darien Harbor, Ga.1 ,2 1968 199,723 83,007 
Fancy Bluff Creek, Ga. 1 1935 8,000 4,200 
St. Marys River, Ga. and Fla., and North 
River, Ga. 1951 15,688 59,406 
Sapelo Harbor, Ga.2 '3 '4 1929 17,906 17,094 
Satilla River, Ga. 1 1951 9,452 42,016 
Savannah River above Augusta, Ga. 3 '4 ' 5 1929 69,600 5,870 
Savannah River at Augusta, Ga.3,4, 6 1929 200,556 17,444 
1. Channel adequate for commerce. 5. About 84 percent completed. Owing to construction of 2 
2. Completed. power dams which submerged much of the work under the 
3. Project recommended for abandonment in H. D. 467, present and former projects, this improvement cannot be 
69th Cong., 1st sess. completed as originally planned. 
4. No commerce reported. 6. Excludes $185,000 contributed funds ($172,151 for 
construction and $12,849 for operation and maintenance). 
TABLE 8-D OTHER AUTHORIZED FLOOD CONTROL PROJECTS
Cost to June 30, 1970 
For Last 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Augusta, Savannah River, Ga.1 1941 $643,016 $ - 
Macon, Ga.1 1955 380,043 
1. Completed. 
SAVANNAH RIVER BASIN, GA. AND S.C.: 
DAMS AND RESERVOIRS 
TABLE 8-E (See Section 12 of text) 
ESTIMATED COST 
NAME RIVER FEDERAL NON-FEDERAL TOTAL 
Clark Hill, Ga. and S. C. Savannah $ 79,153,0004 - $ 79,153,0001'4 
Hartwell, Ga. and S. C. Savannah 89,240,000 - 89,240,0002 
Goat Island, Ga. and S. C. Savannah 36,400,000 - 36,400,0003 
Middleton Shoals, Ga. and S. C. Savannah 16,500,000 16,500,0003 
Chattooga units (4), Ga. 
and S.C. Chattooga 41,700,000 41,700,0003 
Tallow Hill, Ga. Broad 39,000,000 - 39,000,0003 
Anthony Shoals, Ga. Broad 18,100,000 18,100,0003 
Newry-Old Pickens, S.C. Keowee 29,500,000 - 29,500,0003 
1. Final cost. 
2. Approved Aug. 1963 
3. Approved July 1954. 
4. Excludes Code 710 funds. 
284

SAVANNAH, GA., DISTRICT 
FLOOD PLAIN STUDIES COMPLETED TO DATE 
TABLE 8-F (See Section 15 of text) 
REQUESTING DATA FEDERAL 
LOCATION AGENCY COMPLETED COST 
Shoal Creek DeKalb County, Ga. Apr 67 $22,000 
Headquarters South River Metropolitan Atlanta, Ga. May 67 22,900 
Brooklyn Creek Athens and Clarke County, Ga. Feb 68 13,300 
Snapfinger Creek DeKalb County, Ga. Mar 68 29,000 
Intrenchment: 
Sugar; Doolittle 
and Doless Creeks DeKalb County, Ga. Apr 68 34,500 
Hunnicutt Creek Athens and Clarke County, Ga. Jul 68 10,500 
Casey Canal - South Savannah and Chatham County, Ga. Jun 68 15,300 
Conley Creek and South River Metropolitan Atlanta, Ga. Jul 68 22,900 
Cobbs Creek and Fowler Branch DeKalb County, Ga. Jun 68 23,800 
Casey Canal - North Savannah and Chatham County, Ga. Aug 68 6,300 
Pole Bridge, Stephenson, 
Stone Mountain, 
Crooked and Swift Creeks DeKalb County, Ga. Oct 68 29,900 
Walnut Creek Macon and Bibb County, Ga. Dec 68 7,800 
Horse Creek Aiken County, S.C. Aug 69 5,300 
Sweetwater and Jackson Creeks Metropolitan Atlanta, Ga. Jul 69 11,500 
Waycross Drainage Canal Waycross and Ware County, Ga. Jul 69 22,400 
Cedar Creek Athens and Clarke County, Ga. Aug 69 9,500 
Harmon Canal Savannah and Chatham County, Ga. Oct 69 7,700 
Trail Creek Athens and Clarke County, Ga. Nov 69 11,700 
Lower South River Metropolitan Atlanta, Ga. Jun 70 23,000 
Springfield Canal Savannah and Chatham County, Ga. Feb 70 4,000 
Tobesofkee Creek Macon and Bibb County, Ga. Jun 70 20,000 
285 
451-584 0-72-19

JACKSONVILLE, FLA., DISTRICT* 
With exception of a small area in the northeastern 
section of Florida, this district comprises a portion of 
south-central Georgia and all of peninsular Florida, 
embracing the watersheds tributary to the Atlantic 
Ocean and the Gulf of Mexico from, and including the 
harbor at Fernandina, Florida, to and including the 
Aucilla River. It also includes Puerto Rico and the 
Virgin Islands. 
IMPROVEMENTS 
Navigation Page 
1. Aquatic Plant Control (R&H Act of 
1965) ............................ ............ 287 
2. Bayport, Fla ...................... ................... 288 
3. Canaveral Harbor, Fla. ......................... 288 
4. Channel from Naples to Big Marco 
Pass: 12-foot channel, Gordon Pass to 
Naples, Fla. ..................................... 289 
5. Charlotte Harbor, Fla. ........................... 289 
6. Clearwater Pass, Fla. ............................. 289 
7. Cross-Florida Barge Canal .................... 290 
8. Eau Gallie Harbor, Fla. ........................ 291 
9. Fernandina Harbor, Fla. ....................... 291 
10. Fort Myers Beach, Fla. .......................... 291 
11. Intracoastal Waterway, Caloosahatchee 
River to Anclote River, Fla .............. 292 
12. Intracoastal Waterway, Jacksonville to 
Miami, Fla. ..................................... 292 
13. Jacksonville Harbor, Fla. ....................... 293 
14. Manatee River, Fla. ............................... 294 
15. Melbourne Harbor, Fla. .......................... 294 
16. Miami Harbor, Fla. ............................... 295 
17. Okeechobee Waterway, Fla ............. .. 296 
18. Oklawaha River, Fla .............................. 297 
19. Palm Beach Harbor, Fla ...................... 297 
20. Pithlachascotee River, Fla .................. 297 
21. Ponce De Leon Inlet, Fla ...................... 298 
22. Ponce Harbor, P.R. ................................ 298 
23. Removing the Water Hyacinth from 
Navigable Waters in the State of 
Florida .................... ...... .......... 299 
24. St. Lucie Inlet, Fla. ................................ 299 
Navigation (cont.) Page 
25. Tampa Harbor, Fla. ................................. 300 
26. Navigation Projects on which 
Reconnaissance and Condition 
Surveys only were Conducted during 
Fiscal Year ..................................... 300 
27. Other Authorized Navigation Projects ... 300 
28. Navigation Work under Special 
Authorization (Preauthorization) ......... 300 
Beach Erosion Control 
29. Palm Beach County from Lake Worth 
Inlet to South Lake Worth Inlet, Fla. 301 
30. Pinellas County, Fla. .............................. 301 
31. Virginia Key and Key Biscayne, Fla..... 302 
32. Other Authorized Beach Erosion 
Control Projects .................................. 302 
33. Beach Erosion Control Activities 
Pursuant to Section 103, Public Law 
87-874 (Preauthorization) ..................... 302 
Flood Control 
34. Central and Southern Florida .............. 302 
35. Four River Basins, Fla ............................ 304 
36. Hogtown Creek, Fla ............................ 305 
37. Inspection of Completed Flood Control 
Projects ....................................... 305 
38. Other Authorized Flood Control Projects 306 
39. Flood Control Work under Special 
Authorization ..................................... 306 
General Investigations 
40. 
41. 
Surveys ........................................ 306 
Collection and Study of Basic Data ....... 306 
NAVIGATION 
1. AQUATIC PLANT CONTROL (R&H 
ACT OF 1965) 
Location. Navigable waters, tributary streams, connecting 
channels, and other allied waters in Jacksonville 
District. 
Existing project. The project provides for control and 
progressive eradication of water hyacinth, alligatorweed, 
Eurasian watermilfoil, and other obnoxious 
aquatic plant growths from navigable waters, 
tributary streams, connecting channels, and other 
allied waters of the United States, in combined interest 
of navigation, flood control, drainage, agriculture, fish 
and wildlife conservation, public health, and related 
purposes, including continued research for development 
of most effective and economical control 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
287

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
measures in cooperation with other Federal and State 
agencies in accordance with report of Chief of 
Engineers, House Document 251, 89th Congress, 1st 
session. The authorizing act provides that research and 
planning costs shall be borne fully by the United States. 
(See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local interests must hold the United 
States free from damages that may occur from 
operations performed in connection with this project 
and contribute 30 percent of cost of operations. 
Compliance with requirements of local cooperation is 
on schedule. 
Operations and results during fiscal year. New work: 
Spraying of 32,057 acres of hyacinths was accomplished 
during the year (14,784 acres by the Corps 
and 17,273 acres by the State). Costs incurred were 
$14,579 for engineering and $317,298 for operations. 
Condition at end of fiscal year. Operations by the Corps 
and the State of Florida are in progress. 
2. BAYPORT, FLA. 
Location. The project is on the west central coast of 
Florida, about 30 miles north of Tarpon Springs. (See 
Coast and Geodetic Survey Chart No. 1258.) 
Existing project. The project provides for a channel 6 
feet deep by 75 feet wide extending from and including 
a 125- by 200-foot turning basin of the same depth to 
deep water in the Gulf of Mexico. The project is about 
4 miles long. 
Plane of reference is mean low water. Mean tidal 
range is 1.8 feet. 
Estimated cost of the project (1969) is $149,500 
Federal cost and $167,200 non-Federal cost ($149,500 
contributed funds, $14,000 for diking, and $3,700 for 
lands). (See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local interests must: contribute in 
cash 50 percent of construction cost; provide all lands 
and rights-of-way; save the United States free from 
damages; provide and maintain adequate mooring 
facilities and utilities; provide and maintain depths, 
commensurate with the project, in berthing areas and 
local access channels serving the terminals; and 
establish regulations prohibiting discharge of wastes 
into project waters. Assurances of local cooperation 
were accepted July 24, 1970. 
Terminal facilities. Boat launching ramps are available 
at county recreation areas at Bayport, Pine Island, 
Weekiwachee Gardens, and at four marinas in the 
area. A boat and motor repair facility is located at 
Hernando Beach and supplies are available at various 
marinas in the area. Facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. New work: The 
detailed project report was completed. Engineering 
and design costs were $14,682. 
Condition at end of fiscal year. Construction of the 
project has not commenced. 
3. CANAVERAL HARBOR, FLA. 
Location. The harbor is located on the east coast of 
Florida in Canaveral Bight, about 146 miles south of 
the entrance to Jacksonville Harbor and 69 miles north 
of the entrance to Fort Pierce Harbor. (See Coast and 
Geodetic Survey Charts Nos. 456 and 1245.) 
Existing project. The authorized project provides for 
maintenance of the 37- and 36-foot-depth entrance 
channel and 35-foot-depth turning basin; construction 
and operation of a sand transfer plant; relocation of the 
perimeter dike about 4,000 feet westward and 
extension of the harbor westward; two entrance jetties 
100 feet long (constructed of native stone core and 
granite sides and cap); a lock; a channel and turning 
basin 31 feet deep near the relocated dike; and a barge 
canal 12 by 125 feet from the turning basin to the 
Atlantic Intracoastal Waterway. The project is about 
11.5 miles long. 
Plane of reference is mean low water (ocean) for the 
harbor dike and lock, and mean low water (Banana 
River) for the barge canal. Mean tidal range is 3.5 feet 
at the entrance and practically non-tidal in Banana 
and Indian Rivers. (See Table 9-C for Data Relative to 
Lock.) 
Estimated cost (1970) of new work is $11,260,000 
from Federal funds; $3,629,000 non-Federal cost ($1, 
003,000 contributed funds and $2,626,000 other costs); 
and $700,000 costs to NASA. (See Table 9-B for 
Authorizing Legislation.) 
Local cooperation. Local interests must: provide all 
lands, rights-of-way, spoil-disposal areas, retaining 
dikes, and embankments; hold United States free from 
damages; provide and maintain four-lane bridge and 
roadway subject to Federal contribution of 65.3 percent 
of cost of constructing bridge and 51.2 percent of 
constructing roadway; provide public terminal and 
transfer facilities; and make alterations as required in 
berthing facilities. For further details see Senate 
Document 140, 87th Congress, 2nd session. Compliance 
by local interests is on schedule. Non-Federal 
contribution for new work is $1,003,000. 
Terminal facilities. South of the barge canal and west 
of the turning basin is a 1,500-foot long concrete 
bulkhead having a 12-foot-depth berthing area which 
accommodates shrimp and commercial fishing boats. 
Two finger piers at the west end of the bulkhead are 
available for charter boats. On the south side of the 
turning basin is a 1,060-foot long marginal wharf, 
complete with utilities, operated by the Canaveral Port 
Authority. Two 30,000 sq. ft. newsprint warehouses 
have been constructed, one in 1967 and the other in 
1969. On the south shore of the ship canal, parallel to 
channel, are 1,200 feet of oil docking facilities, 
complete with pipelines to the storage tanks. At the 
easterly end of the barge canal is a terminal for 
handling bulk construction materials. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Engineering and design and supervision and administration 
costs in connection with preparation of 
plans and specifications for the sand transfer plant 
were $26,334 and $2,732, respectively. 
288

JACKSONVILLE, FLA., DISTRICT 
Maintenance: Construction of about 1,500 feet of 
rock revetment along the north side of inner channel 
was started January 28 and completed February 25, 
1970. Contract costs were $32,436. From August 25 to 
October 5, 1969, and from March 29 to April 23, 1970, 
the U. S. Dredge Gerig removed 1,277,533 and 505,281 
cubic yards of material, respectively, from the entrance 
channel at a cost of $306,505 and $237,364, 
respectively. Dredging in the inner channel and 
turning basin and in the barge canal started March 20 
and was completed April 6, 1970. The Dredge Ideal 
removed 157,792 cubic yards of material at a contract 
cost of $69,599. Acquisition and maintenance of a 
power mower cost $2,336. Engineering and design and 
supervision and administration costs were $10,508 and 
$79,397, respectively. Hired labor surveys, inspections, 
and reports cost $577. 
Operation and care: The lock was operated and 
buildings and grounds maintained at a hired labor cost 
of $98,247. 
Condition at end of fiscal year. The existing project is 
about 58 percent completed. The perimeter dike and 
jetties are in good condition. 
Work remaining to complete the project is construction 
of the sand transfer plant and extension of the 
harbor. 
4. CHANNEL FROM NAPLES TO BIG 
MARCO PASS: 12-FOOT CHANNEL, 
GORDON PASS TO NAPLES, FLA. 
Location. Naples Bay is on the southwestern side of the 
Florida peninsula about 35 miles south of the mouth of 
the Caloosahatchee River and approximately 1 mile 
inland and parallel to the Gulf of Mexico coastline. 
(See Coast and Geodetic Survey Chart No. 1254.) 
Existing project. The authorized project provides for 
an interior channel 6 by 70 feet from Naples to Big 
Marco Pass; a channel 12 by 150 feet from the Gulf of 
Mexico to Gordon Pass, thence 10 by 100-70 feet to a 
10-foot-depth turning basin in the upper Naples Bay; 
and an 8-foot-depth turning basin at the municipal 
yacht basin. Plane of reference is mean low water. 
Mean tidal range is 2.1 feet. (See Table 9-B for 
Authorizing Legislation.) 
For further details see Annual Report for 1962. 
Local cooperation. Fully complied with to date. 
Contributed funds for new work was $159,975. 
Terminal facilities. Four seafood packing houses, 2 
marine repair yards; a municipal pier and basin for use 
by recreational boats; and numerous private piers and 
slips for both commercial and recreational craft are 
available. Facilities are considered adequate for 
existing commerce. 
Operations and results during fiscal year. Maintenance: 
Dredging to remove shoals in the 12-foot channel of 
Gordon Pass commenced June 22, 1970. The Dredge 
Hendry No. 4 removed 181,373 cubic yards of material at 
a contract cost of $35,000. Engineering and design and 
supervision and administration costs were $6,602 and 
$633, respectively. 
Hired labor surveys, inspections, and reports cost $9, 
472. 
Condition at end of fiscal year. The project is complete. 
5. CHARLOTTE HARBOR, FLA. 
Location. The harbor is located in a large bay on the 
west coast of Florida. The entrance is 68 miles south of 
the entrance to Tampa Bay and 150 miles north of Key 
West. (See Coast and Geodetic Survey Chart No. 
1255.) 
Previous projects. For details, see page 457 of 1959 
Annual Report. 
Existing project. The authorized project provides for a 
channel 32 by 300 feet, increased to 700 feet at the 
bend, from the Gulf of Mexico to Port Boca Grande, 
thence 10 by 100 feet from deep water at Port Boca 
Grande to and including a turning basin 200 feet 
square at the municipal terminal at Punta Gorda. The 
project is about 29.5 miles long. 
Plane of reference is mean low water. Mean tidal 
range is one foot at Port Boca Grande and 1.4 feet at 
Punta Gorda. Extreme range is about 3 feet at Port 
Boca Grande and 3.8 feet at Punta Gorda. Strong 
southwesterly winds raise water level about 1.5 feet; 
strong northerly and easterly winds lower it about one 
foot. (See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local cooperation is fully complied 
with to date. Non-Federal contribution for new work 
was $15,563. 
Terminal facilities. Existing facilities consist of a 
phosphate wharf at Port Boca Grande and a municipal 
earthfill pier about 850 feet long at Punta Gorda, both 
open to the public. Railway connections are available 
at Port Boca Grande, and highway and railway 
connections are available at Punta Gorda. There is a 
tank farm at Port Boca Grande for storage and 
rehandling of bunker fuel oil and numerous facilities 
are available in the area for docking and servicing 
small craft. Facilities are considered adequate for 
existing commerce. 
Operations and results during fiscal year. Maintenance: 
From February 24 to March 3, 1970, the U. S. Dredge 
Gerig removed 89,109 cubic yards of material from the 
entrance channel at a cost of $53,743. Engineering and 
design and supervision and administration costs were 
$4,339 and $10,577, respectively. Hired labor surveys, 
inspections, and reports cost $6,068. 
Condition at end of fiscal year. The project was 
completed in 1959. 
Total costs under existing project to June 30, 1970, 
have been $420,169 for new work and $1,760,418 for 
maintenance, a total of $2,180,587. In addition, $15, 
563 was expended from contributed funds for new work 
in Boca Grande entrance channel. 
6. CLEARWATER PASS, FLA. 
Location. Clearwater Pass is a natural inlet connecting 
Clearwater Bay with the Gulf of Mexico. The 
pass is located about 25 miles north of the entrance to 
Tampa Harbor and 14 miles south of the mouth of 
289

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Anclote River. (See Coast and Geodetic Survey Charts 
Nos. 858 and 1257.) 
Existing project. The authorized project provides for a 
channel 10 by 150 feet in the Gulf of Mexico through 
Clearwater Pass, thence 8 by 100 feet eastward to the 
Intracoastal Waterway; a side channel 8 by 100 feet; 
and a turning basin 8 feet deep by 100 to 450 feet wide 
by 850 feet long. Plane of reference is mean low water. 
The mean range of tide is 1.8 feet at Clearwater 
Marina. Length of the project is 3 miles. For further 
details see 1961 Annual Report. (See Table 9-B for 
Authorizing Legislation.) 
Local cooperation Local cooperation is fully complied 
with to date. Non-Federal contribution for new work 
amounted to $42,783. 
Terminal facilities. The city of Clearwater operates a 
recreational pier. There are several marinas providing 
service for charter boats and small recreational craft 
and one marine railway. All facilities are accessible by 
highway connections. Facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Dredging to remove shoals in the 10-foot and 8-foot 
channels commenced August 4 and was completed 
August 25, 1969. The Dredge Hendry No. 6 removed 72, 
854 cubic yards of material at a contract cost of $66, 
063. Engineering and design and supervision and 
administration costs were $1,411 and $5,629, 
respectively. 
Condition at end of fiscal year. The project was 
completed in 1961. Maintenance dredging during the 
year restored project dimensions. 
7. CROSS FLORIDA BARGE CANAL 
Location. The proposed canal extends up the St. Johns 
River, past Palatka, thence up the valley of the 
Oklawaha River, across the divide south of Ocala, and 
down the valley of the Withlacoochee River to the Gulf 
of Mexico, about 95 miles north of Tampa, Florida. 
Existing project. The authorized project provides for a 
lock canal with project depth of 12 feet and minimum 
bottom width of 150 feet, with five locks and two earth 
dams. Project including the section in the St. Johns 
River is 184 miles long. (See Table 9-D for Locks and 
Dams.) 
Operation and maintenance of the locks and dams 
will be a Federal responsibility. Estimated cost of new 
work (1970) is $179,000,000 Federal, and $19,500,000 
non-Federal for lands, rights-of-way, and other costs. 
(See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local interests must furnish lands 
and rights-of-way for construction of canal; hold 
United States free from damages; and operate and 
maintain all highway bridges and roadways built in 
connection with project. Assurances of local cooperation 
were accepted by the District Engineer on 
November 13, 1963. Compliance by local interests is on 
schedule. 
Terminalfacilities. None. 
Operations and results during fiscal year. New work: 
Construction of Eureka Lock, Dam, and Spillway and 
excavation of the canal from Withlacoochee River to 
Inglis Lake continued. Contract costs were $32,032 and 
$63,685, respectively. No costs were incurred during 
the year on Buckman Lock. 
Lake Ocklawaha clearing, construction of State 
Road 316 Bridge at Eureka, and Inglis Lock Bypass 
Channel were completed October 5, 1969, October 15, 
1969, and January 28, 1970, at contract costs of $61, 
719, $63,794, and $278,526, respectively. 
Operations for drift removal from Lake Ocklawaha 
started December 29, 1969. Contract costs were $213, 
872. 
Construction of State Road 40 Bridge at Delks Bluff 
started June 16, 1970. No costs incurred during the 
year. 
Miscellaneous contract costs in connection with 
recently completed Rodman Dam and Spillway were 
$34,045. Miscellaneous costs in connection with 
recently completed canal work were $11,675. 
Purchase of lands for recreation areas cost $199,161. 
Permanent operating equipment cost $41,491. 
Settlement of claim under contract for construction 
of Inglis Lock amounted to $278,682. 
Removal of water hyacinths cost $39,975. 
Engineering and design and supervision and 
administration costs were $762,802 and $287,886, 
respectively. 
Maintenance: Removal of debris, mosquitoes, and 
plant life from reservoirs cost $177,292. Maintenance 
of boat ramps cost $45,295. Acquisition of boat ramps 
cost $111,743. Maintenance canal slopes, berms, and 
fencing cost $88,630. Regulation of Lake Ocklawaha, 
analysis of hydrologic and meteorologic data for 
scheduling release from lake cost $4,460. Providing 
access to boat ramp Site 2B cost $16,029. Extension of 
parking area Rodman Dam cost $22,951. Engineering 
and design cost $2,486. Supervision and administration 
cost $116,937. Hired labor surveys, inspections, and 
reports cost $35,727. 
Operation and maintenance: Inglis, Eureka, and 
Buckman Locks, Rodman Dam, and buildings and 
grounds were maintained by hired labor at a cost of 
$138,617. 
Regulation. 
a. Rodman Dam. Lake Ocklawaha was created on 
September 30, 1968. During the latter part of FY 1969 
stages in the lake were held between 14.0 feet and 16.0 
feet m.s.l. to allow final clearing of trees and limbs from 
the site. Between June 16 and July 14, 1969, discharges 
were limited to permit the lake to rise to its full 
operational level of 20.0 feet, m.s.l. Since then 
discharges have been made as necessary to maintain a 
lake stage of 20.0 feet. The Corps of Engineers regulates 
the lake. 
The lake stage was 18.4 feet onJuly 1, 1969, and 20.0 
feet on June 30, 1970. Rainfall was above average for 
nearly the entire year. The estimated net water supply 
during FY 1970 was 2,181,000 AF (acre-feet). 19,000 
AF were used to raise the lake to elevation 20 feet; 22, 
290

JACKSONVILLE, FLA., DISTRICT 
000 AF were used for lockages through Buckman Lock, 
and 2,140,000 AF were discharged through Rodman 
Spillway as regulatory releases. 
b. Others. Project works in the remaining lakes have 
not been completed. Stages in Lake Rousseau above 
Inglis Dam are regulated by the State of Florida 
through the Southwest Florida Water Management 
District. 
Condition at end of fiscal year. Construction of project 
commenced February 24, 1964, and is 26 percent 
completed. Inglis Lock, Rodman Dam and Spillway, 
and canal from Palatka to Lake Ocklawaha and from 
Inglis Lake to Gulf of Mexico, including Inglis Bypass 
Channel, are completed. 
Note: Designations of features on the project have 
changed, as follows: Rodman Reservoir is changed to 
Lake Ocklawaha; Eureka Reservoir to Eureka Lake; 
Inglis Reservoir to Lake Rousseau; and St. Johns Lock 
to Henry H. Buckman Lock. 
8. EAU GALLIE HARBOR, FLA. 
Location. The Harbor is located on Indian River 
about midway of the State of Florida, 176 miles south 
of Jacksonville Harbor and 174 miles north of Miami 
Harbor. (See Coast and Geodetic Survey Chart 1246.) 
Existing project. The authorized project provides for a 
channel 8 x 100 feet from Indian River to and 
including a 300- x 600-foot turning basin in Eau Gallie. 
The project is about 2,700 feet long. Plane of reference 
is mean low water. The harbor is almost non-tidal. 
(See Table 9-B for Authorizing Legislation.) 
Local cooperation. Fully complied with to date. 
Terminal facilities. A privately owned boatyard in Eau 
Gallie Harbor provides more than 600 feet of docking 
space used chiefly by pleasure boats. There are also two 
marine railways and repair and storage facilities 
available. The facilities are considered adequate for the 
present needs of navigation. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous costs relative to recently completed 
dredging amounted to $2,856. Engineering and design 
and supervision and administration costs were $648 
and $315, respectively. 
Condition at end of fiscal year. The project was 
completed in 1939. In June 1969 the controlling depth 
of the channel was 7.8 feet. 
9. FERNANDINA HARBOR, FLA. 
Location. Entrance to the harbor is located on the 
northeast coast of Florida about 95 miles south of the 
entrance to Savannah Harbor, Georgia, and 22 miles 
north of the entrance to Jacksonville Harbor, Florida. 
(See Coast and Geodetic Survey Chart 453.) 
Existing project. The authorized project provides for a 
32-foot-depth channel (maximum channel in active 
status: 28 feet) generally 300-400 feet wide from deep 
water in the ocean to the junction of Lanceford Creek 
with Amelia River; an 800-foot-wide turning basin at 
the first bend below Lanceford Creek; and two jetties, 
19,150 and 11,200 feet long. Project is 7 miles long. 
Mean tidal range is 5.8 feet on the bar and 6 feet in the 
inner harbor. Plane of reference is mean low water. 
(See Table 9-B for Authorizing Legislation.) 
Local cooperation. Fully complied with to date. 
Terminal facilities. There are two large wharves 
operated by industrial plants; twelve wharves serving 
fishing boats, recreational craft, and other vessels; three 
oil handling wharves with pipelines; and a Municipal 
Marina and Sportsman's Wharf with public facilities 
for small craft. Total berthing space is approximately 
4,065 feet. Most terminals are served by rail, and all 
have highway access. Facilities are considered adequate 
for existing commerce. (See Port Series No. 16 
(Part 2), 1964.) 
Operations and results during fiscal year. Maintenance: 
The U.S. Dredge Gerig completed dredging operations 
in the entrance channel July 11, 1969, removing 263, 
565 cubic yards of material at a cost of $85,800. 
Supervision and administration costs were $9,707. 
Hired labor surveys, inspections, and reports cost $16, 
837. 
Condition at end of fiscal year. The active portion of 
existing project is complete. Jetties are in need of 
repair. Remaining work is to deepen the inner harbor 
channel and turning basin to 32 feet when and if 
inactive 1950 authorization is reactivated. The outer 
harbor channel has been deepened to 34 feet in 
development of a military project. Authorized dimensions 
as modified are generally available throughout 
the project. 
10. FORT MYERS BEACH, FLA. 
Location. Fort Myers Beach is on Estero Island near 
the mouth of the Caloosahatchee River, about 20 miles 
below Fort Myers and 110 miles south of Tampa, 
Florida. (See Coast and Geodetic Survey Charts Nos. 
855-SC and 1255.) 
Existing project. The authorized project provides for a 
channel 12 feet deep x 150 feet wide from that depth in 
San Carlos Bay into Matanzas Pass, thence 11 x 125 
feet in Matanzas Pass to and including a turning basin 
2,000 feet upstream from the upper shrimp terminals. 
Project is 2.5 miles long. 
Plane of reference is mean low water. Mean tidal 
range is 1.7 feet. Spring range is about 2.3 feet. Strong 
northerly winds lower the water surface 1 to 2 feet; 
strong southerly winds have an opposite effect. 
(See Table 9-B for Authorizing Legislation.) 
Estimated cost of new work for the 1968 authorization 
is $65,100, all Federal cost. 
Local cooperation. Local cooperation requirements 
recommended in House Document 183 of the 1960 
River and Harbor Act have been fully complied with to 
date. Under section 107 of the Act local interests must: 
provide all lands and rights-of-way; hold United States 
free from damages; provide and maintain at no cost to 
U.S. mooring facilities and utilities; provide and 
maintain without cost to United States depths in 
291

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
berthing areas and local access channels commensurate 
with the depths provided in the related 
project areas; accomplish any alterations as may be 
required in cable crossings; and establish regulations 
prohibiting discharge of pollutants in the channel. 
Non-Federal cost of completed work was $1,095. 
Assurances of local cooperation were accepted September 
8, 1969. 
Terminal facilities. There are four shrimp packing 
houses and several fish packing houses, two marine 
railways, a fuel terminal and an ice manufacturing 
plant in the area. There are several commercial 
facilities for servicing shrimp boats. Recreational-craft 
facilities include two marinas, a boat and motor testing 
laboratory, and numerous privately owned piers and 
wharves. All terminals have highway access. Facilities 
are considered adequate for existing commerce. 
Operations and results during fiscalyear. New work: Plans 
and specifications for providing the 11- x 125-foot 
channel extension were completed. Engineering and 
design costs were $2,287. 
Condition at end of fiscal year. The project was 
completed in 1961 except for the 1968 authorization 
providing for extension of the 11- x 125-foot channel. 
In April 1969 controlling depth throughout the 
completed portion of the project was 11.2 feet. 
11. INTRACOASTAL WATERWAY, 
CALOOSAHATCHEE RIVER TO 
ANCLOTE RIVER, FLA. 
Location. The waterway extends from the mouth of 
the Caloosahatchee River at Punta Rassa, Fla., to the 
mouth of Anclote River, Fla., following in general an 
almost continuous series of protected inside waterways 
along the gulf coast of Florida. (See Coast and Geodetic 
Survey Charts 856-SC, 857-SC, and 858.) 
Previous projects. For details, see page 767 of 1945 
Annual Report. 
Existing project. The authorized project provides for a 
channel 9 feet deep by 100 feet wide from Caloosahatchee 
River to Anclote River; deepening the 
existing channel at Caseys Pass to 9 feet; a channel 6 
feet deep by 80 feet wide (Cats Point Channel) along 
the southeastern side of Boca Ciega Bay past 
Frenchman Creek and Gulfport; maintenance of 
bulkheads, revetments, and two jetties built at Caseys 
Pass under previous project; and improvement and 
maintenance of Sunshine Skyway Channel. Plane of 
reference is mean low water. The project includes 
about 160 miles of channels. 
Mean ranges of tide are 1.7 feet at Punta Rassa, 1 
foot at Port Boca Grande, 1.4 feet in Tampa Bay at 
Anna Maria, and 2 feet at entrance to Anclote River. 
Extreme ranges are about 4.5 feet at Punta Rassa, 
about 3 to 4 feet between Port Boca Grande and Corey 
Causeway over Boca Ciega Bay, and about 5.5 feet at 
entrance to Anclote River. Southerly winds over the 
area generally raise water level by 1 to 1.5 feet; 
northerly winds lower water level by 1 to 2 feet. 
(See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local interests must construct, 
maintain, and operate Venice Avenue bridge and any 
other bridges over Route C-l; furnish all lands, rightsof-
way and spoil areas; make alterations and relocations 
required by construction; hold the United 
States free from damages; and contribute in cash 50 
percent of the initial cost of construction of the 6- by 80- 
foot Cats Point Channel and 36 percent of the initial 
cost of construction of the 9- by 100-foot Sunshine 
Skyway Channel. The West Coast Inland Navigation 
District has furnished satisfactory assurances of 
compliance. Non-Federal contribution for constructing 
Cats Point and Sunshine Skyway Channels was $9,707 
and $4,766, respectively. Compliance with requirements 
is on schedule. 
Terminal facilities. Existing facilities include one 
municipal concrete pier, one railway pier, one freight 
wharf, one marginal wharf 500 feet long on terminal 
island, and ten privately owned landings, all at 
Sarasota (municipal pier and freight wharf are open to 
the public; railway pier is used mainly for storing 
Pullman cars. All other piers have highway connections 
only.); six wharves along Boca Ciega Bay; and 
a number of small privately owned piers and wharves 
at various points along waterway for use of commercial 
fishing boats and recreational craft. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Canal bank treatment from Alligator Creek to Dona 
Bay was completed March 18, 1970. Contract costs for 
the year were $107,241. Engineering and design and 
supervision and administration costs were $2,032 and 
$12,009, respectively. 
Maintenance: Repairs to jetties at Caseys Pass 
commenced October 28, 1969. Contract costs were 
$239,167. Channel slopes and berm in the land cut 
through the city of Venice were maintained at a cost of 
$99. Engineering and design and supervision and 
administration costs were $743 and $7,269, 
respectively. Hired labor surveys, inspections, and 
reports cost $18,292. 
Condition at end of fiscal year. Existing project is 
complete. 
Total Federal costs under existing project through 
June 30, 1970, were $7,534,409 for new work and $819, 
113 for maintenance, a total of $8,353,522. In addition, 
$14,473 contributed funds expended for Sunshine 
Skyway and Boca Ciega Bay channels. 
12. INTRACOASTAL WATERWAY, 
JACKSONVILLE TO MIAMI, FLA. 
Location. The waterway extends from Jacksonville to 
Miami, Fla., following the St. Johns River to the mouth 
of Pablo Creek and thence following in general an 
almost continuous series of protected inside waterways 
along the Atlantic coast of Florida to Miami. (See 
Coast and Geodetic Survey Charts 841-SC, 843-SC, 
845-SC, and 847-SC.) 
292

JACKSONVILLE, FLA., DISTRICT 
Previous projects. For details, see pages 618-619 of 1938 
Annual Report. 
Existing project. The authorized project provides for a 
channel 12 by 125 feet from Jacksonville to Miami, 
modified to 10-foot-depth from Fort Pierce to Miami 
by Chief of Engineer's report of July 22, 1960; side 
channels at Sebastian and Daytona Beach and turning 
basins at Sebastian and Vero Beach, all to an 8-foot 
depth; and operation and maintenance of the Palm 
Valley highway bridge. Plane of reference is mean low 
water. Project is 370 miles long, including 21 miles in 
Jacksonville Harbor. Mean range of tide is 3.8 feet at 
St. Johns River, 0.7 foot in the Indian River at Fort 
Pierce, 1.8 feet in Lake Worth at Port of Palm Beach 
terminals, 2.3 feet at the Port Everglades terminals, 
and 2 feet in Biscayne Bay. The extreme range is about 
7 feet at St. Johns River, 1.5 feet at Fort Pierce, and 3 
feet in Biscayne Bay. Tidal effect is imperceptible at 
points along waterway distant from inlets. 
(See Table 9-B for Authorizing Legislation.) 
Local cooperation. Fully complied with to date. 
Terminal facilities. There are a number of privately 
owned piers, wharves, and landings at various points 
along waterway. Terminals with railway connections 
are available at Jacksonville, Fort Pierce, West Palm 
Beach, Port Everglades, and Miami. Municipal piers 
or wharves have been constructed at Titusville, Cocoa, 
Melbourne, and Vero Beach for handling general 
freight and at St. Augustine, Daytona Beach, New 
Smyrna Beach, Eau Gallie, West Palm Beach, Delray 
Beach, Fort Lauderdale, and Miami for use of 
recreational craft. Yacht basins, open to the public, 
have been provided at Jacksonville Beach, Daytona 
Beach, Titusville, Eau Gallie, Vero Beach, Fort Pierce, 
West Palm Beach, Fort Lauderdale, Hollywood, and 
Miami. Facilities are considered adequate for existing 
commerce. (For further details on facilities at 
Jacksonville, see Port Series No. 15, 1969, and at Palm 
Beach, Port Everglades, and Miami, see Port Series No. 
16, 1964.) 
Operations and results during fiscalyear. New work: Costs 
relative to settlement of claim on recently completed 
dredging work from West Palm Beach to Delray Beach 
were $45,908. Supervision and administration costs 
were-$22,20 0 (includes liquidated damages paid by 
contractor). Maintenance: Dredging operations for 
removal of shoals near Jupiter and Bakers Haulover 
Inlets were completed August 2, 1969. The Dredge 
Charleston removed 77,971 cubic yards of material at a 
contract cost of $84,952. From July 6 to October 13, 
1969, repairs were made to Palm Valley Bridge at a 
cost of $65,780. Dredging opposite St. Lucie Inlet was 
performed April 7 to May 3, 1970, and from May 15 to 
May 27, 1970. The Dredge Ideal removed 51,869 cubic 
yards of material at a contract cost of $55,837. A 
contract for dredging between St. Johns River and 
Ponce de Leon Inlet, as required, was awarded June 3, 
1970; however, dredging has not commenced. 
Engineering and design and supervision and 
administration costs were $26,337 and $27,633, 
respectively. Hired labor surveys, inspections, and 
reports cost $65,418. 
Operations and care: The highway bridge near 
Palm Valley was operated and maintained by hired 
labor at a cost of $45,920. 
Condition at end of fiscal year. Existing project as 
modified by the Chief of Engineers is complete except 
for construction of the channel and turning basin at 
Sebastian, Florida, which is in an inactive status. Upon 
completion of maintenance dredging currently underway, 
authorized depths as modified will be 
generally available throughout the project. 
Total Federal costs under existing project through 
June 30, 1970, were $16,953,980 for new work, $7,461, 
251 for maintenance, and $784,160 for operation and 
care, a total of $25,199,391, regular funds. In addition, 
$2,199,842 has been expended from public works funds 
for new work. Non-Federal costs for lands, spoil areas, 
rights-of-way, and other costs are estimated at $3,195, 
000. 
13. JACKSONVILLE HARBOR, FLA. 
Location. The project comprises the lower 26.1 miles 
of St. Johns River which empties into the Atlantic 
Ocean near the northeasterly corner of the Florida 
peninsula. (See Coast and Geodetic Survey Chart 636- 
SC.) 
Previous projects. For details, see page 607 of Annual 
Report, 1938. 
Existing project. The authorized project provides for a 
channel 38 by 400-1,200 feet from ocean to mile 20 via 
Dame Point-Fulton Cutoff, thence 34 feet to Commodore 
Point, and thence 30 feet deep to the F.E.C. 
Railway bridge at Jacksonville, including a 30-foot 
channel in Arlington Cut and in the Old Dame Point- 
Fulton Channel; maintenance of the existing 42- and 
40-foot-depth entrance channel; maintenance of jetties 
at channel entrance; and construction of training walls 
and revetments. All depths are referred to local mean 
low water. Project is about 26.1 miles long. 
Mean tidal range is 5.3 feet on the bar, 4.9 feet at 
Mayport, 2.6 feet at Dame Point, and 1.1 feet at 
Jacksonville. The extreme range varies from about 9 
feet on the bar to about 1.5 feet at Jacksonville. Strong 
northeasterly winds raise the water level about 2 feet at 
Mayport and Jacksonville. Strong southwesterly winds 
lower the water about 1.5 feet at Mayport and 1 foot at 
Jacksonville. 
Estimated cost of new work (1970) is $27,725,000 
Federal cost exclusive of amounts expended on 
previous projects and $661,000 non-Federal cost ($400, 
000 contributed funds and $261,000 for lands, rightsof-
way, and other costs). Of this amount, completed 
modifications amounted to $12,425,000 Federal costs 
and $11,000 non-Federal costs for lands, easements, 
and rights-of-way. 
293

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
(See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local interests have fully complied 
with total requirements of local cooperation for work 
performed to date. For work authorized by the 1965 
River and Harbor Act, local interests must contribute 
2.6 percent of the contract price plus supervision and 
administration for work to be provided by the Corps; 
provide all lands and rights-of-way; save the United 
States free from damages; and provide and maintain 
public terminal and transfer facilities. Assurances of 
local cooperation for this work were accepted February 
11, 1966. Estimated non-Federal contribution for new 
work is $400,000. 
Terminal facilities. There are approximately 100 
waterfront facilities serving the port, including 29 
commercially operated, four of which are open to the 
public. There are 12 commercial oil terminals and four 
oil docks operated by the Navy Department. Rail 
connections are available to all but one of the oil 
terminals and to most commercial facilities. Jacksonville 
Shipyards has facilities for building and 
repairing large vessels, and numerous facilities are 
available for repairing and servicing small craft. 
Jacksonville Port Authority operates the municipal 
docks which are undergoing an extensive expansion 
program. A new 160,000 square-foot warehouse has 
been in use since February 1968; another of the same 
size became operational in June 1970. There is 
continuous marginal wharf of 3,000 feet, including that 
leased to Sea-Land Service, Inc. In addition, 27.5 acres 
of paved open storage was completed for use in January 
1969. On Blount Island, a 1,200-foot wharf and 240, 
000 square-foot transit shecd/warehouse have been in 
use since November 1968. Currently under construction 
is an additional 1,400-foot wharf with 45-ton 
container gantry crane, a 120,000 square-foot transit 
shed, and 15 acres of paved open storage space. 
Upon completion of the expansion program, 
facilities are expected to be adequate for existing 
commerce. (See Port Series No. 15, Revised 1969.) 
Operations and results during fiscal year. New work: 
Preparation of plans and specifications for enlarging 
the channel from the ocean to Mile 20 continued. A 
contract for construction of the channel from the ocean 
entrance to Mile 10 was awarded W 30/0; however, 
construction has not begun. Engineering and design 
and supervision and administration costs were $32,564 
and $4,006, respectively. 
Maintenance: The north and south jetties were 
repaired from September 10, 1969, to February 25, 
1970, at a contract cost of $403,010. Maintenance 
dredging in the channel between Trout River and Mile 
10.7 and in the old river channel (Dames Point to 
Railroad Bridge) commenced April 21, 1970. The 
Dredges Dauntless and Ideal removed 1,098,156 cubic 
yards of material at a contract cost of $446,656. 
Engineering and design and supervision and administration 
costs were $58,911 and $19,292, 
respectively. Hired labor surveys, inspections, and 
reports cost $12,588. 
Condition at end of fiscal year. The project is about 45 
percent completed. Jetties, revetments, and training 
walls are in good condition with the exception of the 
Mile Point Training wall which is in fair condition. 
Work remaining to complete the active portion of the 
project is deepening of the channel to 38 feet from the 
ocean to Mile 20 and widening of the channel near 
Mile 5 and 7. 
Total Federal costs under existing project through 
June 30, 1970, were $12,362,330 for new work, $18,578, 
004 for maintenance, and $102,813 for rehabilitation, a 
total of $31,043,147, regular funds. In addition, $290, 
013 has been expended from public works funds for 
new work. 
14. MANATEE RIVER, FLA. 
Location. The river rises in the western part of the 
peninsula of Florida and flows westwardly past 
Bradenton, Florida, emptying into southern end of 
Tampa Bay near the entrance. (See Coast and 
Geodetic Survey Chart 586.) 
Existing project. The authorized project provides for a 
channel 13 x 100 feet from Tampa Bay to McNeil 
Point, thence 9 x 100 feet to Rocky Bluff, and 4 x 75 
feet to Mitchellville bridge; and a cutoff 6 x 100 feet 
into Terra Ceia Bay. Plane of reference is mean low 
water. Mean range of tide is 1.6 feet at mouth and 1.3 
feet at Rocky Bluff. Project is 23.8 miles long in the 
river and 0.7 mile in the cutoff. Estimated cost of new 
work (1954) is $138,400 Federal funds. (See Table 9-B 
for Authorizing Legislation.) 
Local cooperation. None required. 
Terminal facilities. Three freight piers with a total 
frontage of 700 feet, without railway connections are 
available. Existing facilities are open to the public and 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Snagging in Manatee River from Rocky Bluff to Rye 
Bridge cost $29,934. Supervision and administration 
costs were $3,511. 
Hired labor surveys, inspections, and reports cost $9, 
144. 
Condition at end of fiscal year. Existing project is about 
90 percent completed, majority of the work having 
been completed in 1915. Work remaining is removal of 
a small amount of rock from entrance channel at a 
depth of 12 feet which is in an inactive status. 
15. MELBOURNE HARBOR, FLA. 
Location. The project is on Indian River about 
midway of the State of Florida, 179 miles south of 
Jacksonville Harbor and 171 miles north of Miami 
Harbor. (See Coast and Geodetic Survey Chart 845- 
sc). 
294

JACKSONVILLE, FLA., DISTRICT 
Existing project. The authorized project provides for a 
channel 8 x 100 feet from Indian River to a 400- x 800- 
foot turning basin in Crane Creek. Project is about 3, 
150 feet long. Plane of reference is mean low water. 
The harbor is almost non-tidal. 
(See Table 9-B for Authorizing Legislation.) 
Local cooperation. Fully complied with to date. 
Terminal facilities. The Municipal Marina on the 
north end of the turning basin has a 350-foot steel 
bulkhead with eleven finger piers about 40 feet long 
each. There are also two privately owned storage and 
repair facilities and several privately owned boathouses 
and docks. The facilities are considered adequate for 
existing commerce. 
Operations and results during fiscal year. Maintenance: 
Contract costs relative to recently completed dredging 
in the channel and turning basin were $3,406. 
Engineering and design and supervision and administration 
costs were $789 and $321, respectively. 
Condition at end of fiscal year. The project was 
completed in 1938. As of June 1969 channel depths as 
authorized were available throughout the project. 
16. MIAMI HARBOR, FLA. 
Location. Miami is near the northerly end of Biscayne 
Bay, about 71 miles south of the entrance to Palm 
Beach Harbor. Miami River has its source in the 
Everglades and flows southeasterly to enter Biscayne 
Bay at Miami. (See Coast and Geodetic Survey Charts 
Nos. 547 and 1248.) 
Existing project. The authorized project provides for a 
38- by 500-foot channel from the ocean to the outer end 
of the north jetty, thence 36 by 400 feet wide through 
the entrance and across Biscayne Bay to and including 
a turning basin at the municipal terminals; a 36-foot 
depth turning basin at Fisher Island; two rubblestone 
jetties at the entrance; a channel 15 by 200 feet from 
the mouth of Miami River to the turning basin at the 
municipal terminals; a channel 8 by 200 feet from the 
mouth of Miami River to the Intracoastal Waterway 
and thence 100 feet wide to Government Cut; a 
channel 15 feet deep in Miami River varying in width 
from 250 feet at mouth to 90 feet inland; and a channel 
12 by 100 feet from Miami to a harbor of refuge in 
Palmer Lake. Total project is about 15.3 miles long. 
Plane of reference is mean low water, except for a 15- 
foot channel in Miami River where depths are based 
on flood conditions. Mean tidal variation is 2.5 feet at 
entrance and 2 feet in the bay. Extreme variation is 
about 4.5 feet at entrance and 3 feet in Biscayne Bay. 
Strong easterly winds raise the water level about 1.5 
feet at entrance and 1 foot in the bay. Strong westerly 
winds lower water level about 1 foot at entrance and 
about 0.5 foot in the bay. 
Estimated cost of new work (1970) is $17,265,000 
Federal (Corps of Engineers) cost and $8,188,000 non- 
Federal cost ($1,312,000 contributed funds and $6,876, 
000 other costs). (See Table 9-B for Authorizing 
Legislation.) 
Local cooperation. Local interests must provide all 
lands and rights-of-way; provide and maintain public 
terminal facilities; hold and save the United States free 
from damages; accomplish utility and other relocations 
and alterations as required; establish regulations 
prohibiting discharge of pollutants into the waters of 
the channel and harbor by users thereof; contribute 8.2 
percent of the construction cost of the 1968 modification, 
including engineering and design and 
supervision and administration costs; contribute onethird 
of the initial cost of deepening the channel from 
Miami River to the harbor of refuge in Palmer Lake; 
provide and maintain suitable depths in harbor of 
refuge and construct and maintain adequate mooring 
facilities therein; and in time of storm have refuge open 
to all free of charge. Estimated contributed funds for 
new work are $1,312,000. 
Assurances of local cooperation for the 1968 
modification to the project were accepted December 
18, 1968. 
Terminal facilities. Existing facilities consist of 44 piers 
and wharves of which one is on Fisher Island, three at 
Miami Beach, five along the south side of MacArthur 
Causeway, 10 along the west side of Biscayne Bay at 
Miami, and 25 on Miami River. Four facilities are 
open to the public for handling general cargo, three of 
which accommodate deep-draft vessels. All general 
cargo wharves have highway and railway connections 
except the causeway terminal which has highway 
connections only. A municipal yacht anchorage basin 
and wharf are open to the public for recreational craft. 
Of the remaining piers and wharves, four in the bay 
and three on Miami River are used for handling 
petroleum products, 17 are used in connection with 
ship repair activities, and six are used for mooring 
vessels or handling private freight. In addition, 
numerous landing facilities in and around Miami are 
designed for and used exclusively by recreational craft. 
Metropolitan Dade County is now actively engaged 
in relocating and providing additional port facilities on 
Dodge Island in Biscayne Bay. The facilities, though 
incomplete, were opened to commerce June 7, 1965. 
There is completed 6,500 feet of deepwater berthing 
space (32 ft., m.1.w.) and 2,700 feet for vessels with 
maximum draft of 24 feet. A 2,000-person capacity 
passenger terminal with high-speed baggage facilities 
was completed in 1969. Berths for five cruise ships are 
in use and two more are planned. Two huge free-span 
transit sheds containing 200,000 square feet each and 
two smaller transit sheds of 36,000 square feet each 
have been constructed. A fifth transit shed of 100,000 
square feet is expected to be completed by September 
1970. There are presently in use eight berths for roll-on 
trailerships. Upon completion of relocations and 
construction underway, facilities are expected to be 
adequate for current commerce. 
295

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. Maintenance: 
Supervision and administration cost was $46. Hired 
labor surveys, inspections, and reports cost $6,422. 
Condition at end of fiscal year. The existing project is 
about 56 percent complete. Remaining work is 
deepening entrance channel and turning basins; 
widening of the mouth of Miami River; providing a 
channel 15 by 200 feet from the mouth of the river to 
the municipal turning basin; providing a channel 8 by 
200 feet from the mouth of the river to the Intracoastal 
Waterway, thence 100 feet wide to Government Cut; 
and providing a channel 12 by 100 feet from Miami 
River to a harbor of refuge in Palmer Lake. 
South and north jetties are in fair condition. 
Maintenance dredging is required in the turning basin 
at the municipal terminals. 
17. OKEECHOBEE WATERWAY, FLA. 
Location. The waterway traverses the southern part of 
the Florida peninsula via the Caloosahatchee River, 
Lake Okeechobee, and St. Lucie Canal, connecting 
coastal waterways along the Gulf and Atlantic shores. 
(See Coast and Geodetic Survey Charts Nos. 855-SC 
and 856-SC.) 
Previous projects. For details, see page 785 of 1949 
Annual Report. 
Existing project. The authorized project provides for 
replacing the old locks on the St. Lucie Canal by a 
single new lock; a channel 10 x 100 feet from Ft. Myers 
for about 5 miles upstream, thence 8 x 100 feet to the 
Intracoastal Waterway, Jacksonville to Miami, near 
Stuart; an 8-foot depth basin at Stuart; a side channel 
at Ft. Myers; operation and care of St. Lucie Lock; and 
maintenance of features completed under previous 
projects as follows: a 12- by 200-foot channel from the 
Gulf to Punta Rassa, thence 10 by 100 feet to Fort 
Myers with a 10-foot depth basin at Fort Myers; a 6- by 
80-foot channel along the south shore of Lake 
Okeechobee from Clewiston to St. Lucie Canal; a 6- by 
60-foot channel in Taylor Creek from the town of 
Okeechobee to the Lake; and operation and care of 
Moore Haven and Ortona Locks. 
(See Table 9-B for Authorizing Legislation.) 
Estimated cost of completing the active portion of 
the project (enlarging channel to 10 x 100 feet from 
Fort Myers upstream for 5 miles) is $158,700 Federal 
cost and $18,400 non-Federal cost ($1,300 contributed 
funds and $17,100 for lands and relocations). 
For further details see 1962 Annual Report. 
Local cooperation. Fully complied with for completed 
portion of project. For uncompleted active portion of 
project local interests must: contribute in cash 0.8 
percent of the construction cost including engineering 
and design and supervision and administration thereof 
for all work to be performed by the Corps of Engineers; 
provide all lands, easements, and rights-of-way; hold 
the United States free from damages; provide and 
maintain adequate public terminal and transfer 
facilities open to all; provide and maintain depths in 
berthing areas and local access channels serving the 
terminals commensurate with the depths provided in 
the related project areas; accomplish such alterations 
as required in the cable crossings as well as their 
maintenance; and establish regulations prohibiting 
discharge of pollutants in the waters. Assurances of 
local cooperation accepted March 19, 1969. 
Terminal facilities. There are 3 freight piers, 1 
municipal recreation pier, 4 privately owned piers, and 
a municipal yacht basin on the Caloosahatchee River 
near Fort Myers. The Corps has provided a boat basin, 
launching ramp, and a 120-foot wharf on the 
Caloosahatchee River about one-quarter mile below 
Ortona Lock. 
There are numerous small wooden-pile landings 
along the upper Caloosahatchee River, along the lake 
shore, on St. Lucie Canal, and on the St. Lucie River, 
including one railroad terminal pier, a municipal pier, 
and a pier for handling petroleum products at Stuart. 
A municipal yacht basin has been provided at 
Indiantown. Also, 550 feet of wharves have been 
provided on the west side of Taylor Creek immediately 
landward of Hurricane Gate No. 6 and 150 feet on the 
east side of the creek. A yacht basin has been provided 
on the west side of the creek immediately landward of 
the hurricane gate. The installations on Taylor Creek 
are privately owned, but are open to the public. There 
is a 440-foot marginal wharf on the Industrial Canal at 
Clewiston; a 125-foot wharf at LaBelle; a 150-foot 
wharf at Belle Glade; a 125-foot wharf at Moore 
Haven; a 50-foot wharf at Alva; and a 30-foot wharf on 
Taylor Creek at the town of Okeechobee. A docking 
facility for loading raw sugar was constructed in 1967 
on Herbert Hoover Dike near Belle Glade. All have 
highway and/or railway connections. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscalyear. New work: Plans 
and specifications for the 10-foot channel upstream 
from Ft. Myers are complete and those for recreation 
facilities at W. P. Franklin Lock and Dam are 50 
percent complete. Engineering and design costs were 
$15,225. 
Maintenance: Dredging at St. Lucie Lock started 
August 1 and was completed September 10, 1969. 
Contract costs were $70,547. Dredging in St. Lucie 
River started May 4 and was completed May 14, 1970. 
Contract costs were $45,163. 
Timber guide walls were replaced at St. Lucie Lock 
at a contract cost of $102,491. Contract costs for 
construction of fender guide system above and below 
Moore Haven Lock were $354. Remedial work on floor 
slab of control building at St. Lucie Lock cost $1,900. 
Drainage facilities were installed at St. Lucie Lock at a 
contract cost of $14,540. Snagging and clearing 
navigation channels cost $30,468. Signs and recreation 
facilities were maintained at costs of $1,586 and $5,865, 
respectively. Traffic counters were serviced and 
maintained at a cost of $1,619. 
296

JACKSONVILLE, FLA., DISTRICT 
Engineering and design and supervision and 
administration costs were $29,685 and $25,488, 
respectively. 
Hired labor surveys, inspections, and reports cost 
$41,954. 
Operation and care: Hired labor cost of operating 
Moore Haven, Ortona, and St. Lucie Locks and 
maintaining structures and grounds was $152,755. 
Condition at end of fiscal year. The project is complete 
except for providing the 8-foot depth basin at Stuart, 
which is inactive, and enlarging the channel to 10 by 
100 feet from Ft. Myers upstream for five miles. 
Total Federal costs under the existing project 
through June 30, 1970, were $3,906,433 for new work, 
$1,953,153 for maintenance, and $2,407,967 for 
operation and care, a total of $8,267,553. 
18. OKLAWAHA RIVER, FLA. 
Location. The river has its source in a system of large 
lakes in the central part of the Florida peninsula and 
flows generally northerly, then easterly, emptying into 
St. Johns River 22 miles above Palatka. The extreme 
head of the system is considered to be Lake Apopka, 
120 miles above the river's mouth. 
Previous projects. For details, see page 613 of 1938 
Annual Report. 
Existing project. The authorized project provides for a 
channel 6 feet deep from the river mouth to the head of 
Silver Springs Run; clearing a channel to Lake Griffin; 
maintaining dikes to obtain a navigable depth of about 
4 feet to Leesburg and construction of a lock and dam 
at Moss Bluff. The project length is about 85.7 miles in 
the river and 5.4 miles in Silver Springs Run. 
(See Table 9-B for Authorizing Legislation.) 
Local cooperation. Fully complied with to date. 
Terminal facilities. Numerous private and public 
landings and boat-launching ramps are located along 
the river. Public recreation-craft basins and boatlaunching 
ramps are near Silver Springs, Gores 
Landing, and Moss Bluff. There is a municipal wharf 
on Lake Griffin at Leesburg. Facilities are considered 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Costs in connection with snagging and clearing 
between St. Johns River and Moss Bluff were $111. 
Supervision and administration costs were $12. Hired 
labor surveys, inspections, and reports cost $4,294. 
Condition at end of fiscal year. The project is complete 
except for providing a 6-foot depth channel from the 
mouth of the river to the head of Silver Springs Run, 
which is in an inactive status. The Moss Bluff lock and 
dam structure is in poor but usable condition and is 
being replaced under the Four River Basins, Fla., flood 
control project. The existing channel depths are 
satisfactory for the traffic using the waterway. Total 
Federal costs under the existing project through June 
30, 1970, have been $311,352 for new work, $663,779 
for maintenance, and $498,715 for operation and care 
(excluding $11,414 under provisions of the permanent 
indefinite appropriation), a total of $1,473,846. 
19. PALM BEACH HARBOR, FLA. 
Location. The project is located on the east coast of 
Florida about 71 miles north of the entrance to Miami 
Harbor and about 264 miles southeasterly from the 
entrance to Jacksonville Harbor. (See Coast and 
Geodetic Survey Charts Nos. 291 and 1248.) 
Existing project. The authorized project provides for 
an entrance channel 35 by 400 feet merging with an 
inner channel 33 by 300 feet to and including a turning 
basin; bank revetment; and restoring jetties. The 
project is about 1.6 miles long. 
Mean range of tide in the ocean at the entrance is 2.8 
feet and at the turning basin, 2.2 feet. Extreme range of 
tide is about 4.5 feet at the inlet and 3 feet at the 
terminals. Seven-foot tidal ranges have occurred 
during storms. Project depths refer to mean low water 
which is 1.66 feet below mean sea level. For details, see 
1962 Annual Report. (See Table 9-B for Authorizing 
Legislation.) 
Local cooperation. Fully complied with to date. For 
requirements, see 1961 Annual Report. Non-Federal 
contribution for new work was $509,506. 
Terminal facilities. There are two slips with wharves, 
three warehouses with a total of approximately 138,500 
square feet, and four steel storage tanks for petroleum 
products connected with terminals by pipelines. Rail 
and highway connections, water supply, and other 
facilities have been provided in warehouses and 
shipside of slips. Facilities afford total berthing space of 
approximately 4,700 feet. The wharves are owned by 
Port of Palm Beach District. Facilities are considered 
adequate for existing commerce. (See Port Series No. 
16, 1964, Corps of Engineers.) 
Operations and results during fiscal year. Maintenance: 
Repairs were made to the north jetty and revetment 
from September 3, 1969, to April 13, 1970, at a 
contract cost of $87,692. Dredging of the entrance 
channel commenced April 25, 1970, and was 
completed May 18, 1970. The Dredge Stuart removed 
61,949 cubic yards of material at a contract cost of $96, 
966. Mitigation of shore damages amounted to $49, 
096. Engineering and design and supervision and 
administration costs were $11,747 and $7,396, 
respectively. Hired labor surveys, inspections, and 
reports cost $10,434. 
Condition at end of fiscal year. The project was 
completed in 1967. Maintenance dredging during the 
year restored project dimensions. 
20. PITHLACHASCOTEE RIVER, FLA. 
Location. Pithlachascotee River rises in the cypress 
swamps and ponds of Pasco County about 12 miles 
from the west coast of Florida and empties into the Gulf 
297

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
of Mexico 57 miles north of the entrance to Tampa 
Bay. (See Coast and Geodetic Survey Chart 1258.) 
Existing project. River and Harbor Act of 1945 
authorized a 6- x 100-foot channel from the Gulf of 
Mexico to and including a 200- x 730-foot turning 
basin at Port Richey. Economic restudy dated 
February 24, 1966, approved by Chief of Engineers 
May 17, 1966, modified the project to provide for a 6- x 
75-foot channel from the 6-foot depth in the Gulf of 
Mexico to a point about 500 feet downstream from U. 
S. Highway 19 bridge and a 6- x 150-foot turning basin 
near Port Richey. Length of the improvement is about 
3.2 miles. (See Table 9-B for Authorizing Legislation.) 
Plane of reference is mean low water. Mean tidal 
range is about two feet at the mouth of the river. Strong 
southwesterly winds raise the water level about 1 foot 
and strong northerly winds lower it about 1.5 feet. 
Estimated cost of new work (1970) is $400,000 
Federal (Corps of Engineers) funds and $53,000 non- 
Federal cost ($28,000 contributed funds and $25,000 
cost of lands). 
Local cooperation. Local interests must provide, 
maintain, and operate terminals; furnish all lands and 
spoil disposal areas; and hold the United States free 
from damages. Assurances of local cooperation were 
accepted November 17, 1967. 
Terminal facilities. Existing facilities consist of five 
commercial terminals for handling primarily baitshrimp, 
and a marine railway at Port Richey. There 
are three privately operated marinas with wet and dry 
storage available. The city of Port Richey maintains a 
public recreation dock and boat launching ramp. 
Highway connections only are available. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Engineering and design and supervision and administration 
costs in connection with constructing 
channel and turning basin were $5,611 and $824, 
respectively. 
Condition at end of fiscal year. Construction of the 
project has not started. 
21. PONCE DE LEON INLET, FLA. 
Location. Ponce de Leon Inlet is on the Atlantic coast 
of Florida about 65 miles south of St. Augustine Harbor 
and 57 miles north of Canaveral Harbor. (See Coast 
and Geodetic Survey Chart No. 1245.) 
Existing project. The authorized project provides for 
an entrance channel 15 by 200 feet across the ocean 
bar, thence 12 by 200 and 12 by 100 feet through the 
inlet; thence southward in Indian River North, 12 by 
100 feet, and northward in Halifax River, 7 by 100 feet, 
each leg continuing to the Intracoastal Waterway; 
ocean jetties on the north and south side of the inlet 4, 
200 feet and 2,700 feet long, respectively; and a weir in 
the north jetty with an impoundment basin inside the 
jetty. Plane of reference is mean low water. Mean 
range of tide is 4.1 feet in the ocean and 2.3 feet inside 
the inlet. The project is about 5 miles long. 
Estimated cost of new work (1970) is $1,894,200 
Federal and $2,395,800 non-Federal ($2,305,800 
contributed funds and $90,000 for lands). (See Table 9- 
B for Authorizing Legislation.) 
Local cooperation. Prior to construction, local interests 
must agree to contribute 54.9 percent of the contract 
price plus supervision and administration thereof for 
all items of work to be provided by the Corps, currently 
estimated at $2,305,800; contribute $1,379,000 toward 
the cost of future maintenance and operation to be 
performed by the Corps; provide all lands, rights-ofway 
and alterations to existing improvements required 
for construction and subsequent maintenance of the 
project; hold United States free from damages; and 
provide and maintain necessary mooring facilities and 
utilities open to all. Assurances of local cooperation 
were accepted August 26, 1966. 
Terminal facilities. None in the immediate area. 
Operations and results during fiscal year. New work: 
Channel dredging and construction of the north and 
south jetties continued. Contract costs were $989,545. 
Engineering and design and supervision and administration 
costs were $5,660 and $69,210, respectively. 
Condition at end of fiscal year. The project is about 75 
percent complete. 
22. PONCE HARBOR, P. R. 
Location. Ponce Harbor is on the south-central coast 
of Puerto Rico, about 150 miles by water southeast 
from San Juan Harbor. (See Coast and Geodetic 
Survey Charts 902 and 927.) 
Existing project. The authorized project provides for a 
seawall 362 feet long; dredging two areas north of the 
causeway leading to the pier, 30 and 18 feet deep and 
containing about 77 and 47 acres, respectively; 
dredging an area off the municipal pier 30 feet deep 
and containing about 18 acres and a breakwater 2,400 
feet long extending southwesterly from Punta 
Carenero. Plane of reference is mean low water. Mean 
tidal range is 0.6 foot; extreme varies between about 1 
foot below and 2 feet above mean low water. Estimated 
Federal cost of new work (1956) is $1,430,000. In 
addition, $21,960 has been expended from contributed 
funds. (See Table 9-B for Authorizing Legislation.) 
Local cooperation. The United States shall reimburse 
local interests funds contributed for dredging and shall 
undertake, without contribution by local interests, 
remaining dredging included in the project. All other 
portions of improvement (bulkhead and seawall) shall 
be at the expense of local interests. Local interests must 
construct 2,362 linear feet of seawall and 4,340 linear 
feet of concrete bulkhead wharf; construct a 
rubblemound bulkhead and public landing for small 
boats; cede to a 1-acre plot fronting on the 
rubblemound bulkhead; furnish suitable spoil-disposal 
areas; and provide rights-of-way and release from 
298

JACKSONVILLE, FLA., DISTRICT 
damage claims. For further details see 1949 Annual 
Report. 
Terminal facilities. The municipality of Ponce owns 
and operates the only deep-draft terminal facilities in 
Ponce Harbor, which consist of a municipal pier 515 
feet long and 108 feet wide, and a bulkhead wharf 2, 
611 feet long. Both are equipped for transfer and 
storage of freight. The municipal pier has a 32,000 
square foot transit shed. The bulkhead wharf has four 
steel transit sheds with a total of approximately 103,000 
square feet. Three concrete and steel warehouses 
comprising 80,000 square feet are available for general 
storage. Open storage areas for structural steel, lumber, 
and other bulk and package commodities are also 
provided. Bulk cement is handled and loaded into 
cement cargo ships by the use of a private pipeline 
loading facility. A tuna fish processing and canning 
factory is located on the premises, with direct access to 
the bulkhead wharf. Existing facilities are open to the 
public. 
A $6,000,000 expansion program with new wharf, 
dredging, and mechanical transfer facilities is 
programmed to start in 1971. Upon completion 
facilities are expected to be adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
Plans and specifications were prepared for dredging in 
the 30-foot project alongside the municipal bulkhead 
terminal. Engineering and design and supervision and 
administration costs were $5,391 and $32, respectively. 
Hired labor surveys, inspections, and reports cost $1, 
507. 
Condition at end of fiscal year. The existing project is 
about 13 percent complete. Work remaining for the 
Federal portion of the project consists of completing the 
dredging of the 30-foot maneuvering area next to the 
municipal bulkhead terminal; dredging the 18-foot 
area; dredging the 30-foot area serving the municipal 
pier; and constructing breakwater extending 
southwesterly from Carenero Point. A study completed 
in 1959 found that completion of the remaining work 
was not justified at that time. 
23. REMOVING THE WATER HYACINTH 
FROM NAVIGABLE WATERS IN THE 
STATE OF FLORIDA 
Location. Water hyacinth is found in fresh-water 
streams and lakes in various parts of the district. 
Existing project. The authorized project provides for 
destruction or removal of water hyacinth in navigable 
waters of the State so far as they constitute an 
obstruction to navigation and commerce, using any 
mechanical, chemical, or other means not injurious to 
cattle, and use of log booms to close sloughs and 
backwaters as an auxiliary means. No estimate of the 
final cost of work has been made. (See Table 9-B for 
Authorizing Legislation.) 
For further details, see 1962 Annual Report. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Spraying operations continued during the year. (See 
Table 9-E for Spraying Operations.) 
Condition at end of fiscal year. The project is for 
maintenance. During the year, 21,390 acres of 
hyacinths were sprayed in approximately 2,000 miles 
of waterways. Hyacinths in Lake Okeechobee and in 
St. Johns River Watershed are under reasonable 
control. 
24. ST. LUCIE INLET, FLA. 
Location. The inlet is on the east coast of Florida 
about 19 miles south of the entrance to Fort Pierce 
Harbor, Florida, and 100 miles north of the entrance to 
Miami Harbor, Florida. (See Coast and Geodetic 
Survey Chart No. 1247.) 
Previous project. For details see page 764 of Annual 
Report for 1949. 
Existing project. The authorized project provides for a 
channel 10 x 200 feet across outside rock reef at 
seaward entrance to inlet, and maintenance of an 
existing channel 6 x 100 foot channel between the 
authorized bar channel and the Intracoastal 
Waterway. Total project length is about 1.9 miles. 
Mean tidal range is 2.6 feet on the ocean side and about 
1 foot on the land side of the inlet. Plane of reference is 
mean low water. The estimated cost (1966) of the 
modification to the project is $4,000 annually for 
maintenance. (See Table 9-B for Authorizing 
Legislation.) 
Local cooperation. Local interest must provide all lands, 
easements, and rights-of-way; hold the United States 
free from damages; and provide and maintain without 
cost to the United States mooring facilities and utilities 
available to all on equal terms. Assurances of local 
cooperation applicable to the 1966 modification to the 
project were accepted October 9, 1967. 
Terminal facilities. A municipal pier provides facilities 
for docking and servicing charter fishing and small 
recreational craft. At Stuart there is a dock for 
handling bulk petroleum products and several marinas 
which provide facilities for mooring, servicing and 
minor repair of small craft. Facilities are considered 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Dredging in 6-foot channel and turning basin 
commenced November 5 and was completed 
November 26, 1969. The U.S. Sidecasting Dredge 
Merritt removed 21,182 cubic yards of material at a cost 
of $15,641. Engineering and design and supervision 
and administration costs were $3,717 and $6,664, 
respectively. Hired labor surveys, inspections, and 
reports cost $14,454. 
Condition at end of fiscal year. The project was 
completed in 1948. In July 1970 controlling depth 
throughout the project was 6 feet. Total Federal costs 
299

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
under existing project through June 30, 1970, were $96, 
913 for new work and $450,399 for maintenance, a 
total of $547,312. 
25. TAMPA HARBOR, FLA. 
Location. Tampa Harbor is in a large natural 
indentation of the Gulf of Mexico about midway of the 
west coast of Florida. The entrance is about 220 miles 
north of Key West and about 330 miles southeast of 
Pensacola. (See Coast and Geodetic Survey Charts 
Nos. 586, 587, and 1257.) 
Previous projects. For details, see page 665 of 1938 
Annual Report. 
Existing project. The authorized project provides for a 
channel from the Gulf of Mexico to Port Tampa and 
Tampa, 36 by 600 feet in Egmont Bay, 34 by 500 feet in 
Mullet Key Cut, 34 by 400 feet in Tampa and 
Hillsborough Bays and in Port Tampa and Sparkman 
Channels; channels 34 by 400 feet in Ybor Channel 
and 30 by 300 feet in Seddon and Garrison Channels; 
turning basins at the mouth of Hillsborough River, at 
the entrance to Ybor Channel, and at the entrance to 
Port Tampa; a channel 30 by 200 feet from 
Hillsborough Bay to and including a turning basin in 
Alafia River; a channel 9 by 100 feet to a point 2,000 
feet above Columbus Drive bridge; a breakwater; and 
maintenance of a channel 12 by 200 feet in 
Hillsborough River, and a channel 30 by 150 feet in 
Port Sutton Channel, with a turning basin. The project 
is about 67 miles long, including 10 miles in 
Hillsborough River and 3.6 miles in Alafia River. 
Plane of reference is mean low water. 
Mean range of tide is 1.3 feet at the lower end of the 
bay, 1.6 feet at Port Tampa, and 1.8 feet at Tampa. 
Extreme range is about 3.8 feet at the lower end of the 
bay and 4.8 feet at Tampa. Strong southwesterly winds 
raise the water level about 1.5 feet. Strong northerly 
winds, which usually occur in winter, lower the water 
level about 2 feet. (See Table 9-B for Authorizing 
Legislation.) 
For further details, see 1962 Annual Report. 
Local cooperation. Local cooperation has been fully 
complied with to date. Non-Federal contribution for 
new work has been $13,939. 
Terminal facilities. There are 78 commercial piers and 
wharves at Tampa, including those on Hillsborough 
River and Old Tampa Bay at Rattlesnake, Florida. 
Municipal terminals (now called Metroport) on Ybor 
Channel consist of a slip 778 feet long, 250 feet wide, 
with a wharf on both sides, of which one has a steelframe 
transit shed. Most facilities have railway 
connections. Municipal terminals, one city wharf, and 
about 10 privately owned terminals are open to the 
public. There are 16 commercial oil terminals and 2 
privately owned cement storage facilities. In 1967 the 
Tampa Port Authority completed a 600-head capacity 
cattle loading wharf located on the east side of 
Sparkman Channel. 
Considerable expansion of the port of Tampa is now 
underway. Phosphate loading facilities have been 
constructed just north of Port Sutton to accommodate 
barges and ocean vessels. A new bulk terminal at Port 
Sutton commenced operations in March 1969. The 
Seaboard Coast Line Railroad's new phosphate 
elevator on East Bay known as "Rockport" is 
scheduled to begin operation in July 1970, replacing 
their facilities at Port Tampa and Seddon Island. 
Additional bulk handling and general cargo facilities 
are planned at Hookers Point where approximately 
400 acres of new land have been created by dredging. 
Upon completion, facilities are expected to be 
adequate for existing commerce. (See Port Series No. 
17, revised 1967.) 
Operations and results during fiscal year. Maintenance: 
Miscellaneous charges in connection with recently 
completed dredging in Egmont Channel amounted to 
$88. Engineering and design and supervision and 
administration costs were $531 and $4,647, 
respectively. Hired labor surveys, inspections, and 
reports cost $26,383. 
Condition at end of fiscal year. The project is complete. 
As a whole, the project is in good condition. Annual 
dredging maintains authorized depths throughout 
most of the project. 
Total Federal costs under the existing project 
through June 30, 1970, were: Main project: $22,396, 
853 for new work and $5,982,333 for maintenance, a 
total of $28,379,186 regular funds. In addition, $1,329, 
300 was expended for new work from public works 
funds, $1,463,000 from emergency relief funds, and 
$13,939 from contributed funds. On Hillsborough 
River $270,466 was expended for new work (excluding 
021,155 for preauthorization studies). 
26. NAVIGATION PROJECTS ON WHICH 
RECONNAISSANCE AND CONDITION 
SURVEYS ONLY WERE CONDUCTED 
DURING FISCAL YEAR 
(See table 9-F.) 
27. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See table 9-G.) 
28. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION 
Navigation Activities Pursuant to Section 107, Public Law 
86-645 (Preauthorization) 
(See table 9-H.) 
300

JACKSONVILLE, FLA., DISTRICT 
BEACH EROSION CONTROL 
29. PALM BEACH COUNTY FROM LAKE 
WORTH INLET TO SOUTH LAKE 
WORTH INLET, FLA. 
Location. The project is located on a 15.6-mile reach 
of shore on the east coast of Florida between Lake 
Worth Inlet and South Lake Worth Inlet. The town of 
Palm Beach occupies the northern 10.5 miles of the 
sandy barrier beach island (Palm Beach Island) about 
70 miles north of Miami. The remainder of the island is 
in the towns of Lake Worth, Lantana, and Manalapan. 
(See Coast and Geodetic Survey Chart No. 1248.) 
Existing project. The authorized project provides for 
Federal participation in the costs of a plan of protection 
comprising restoration of a protective beach, 
construction and operation of a sand transfer plant, 
and additional periodic beach nourishment. Federal 
funds would be contributed, subject to certain 
conditions, in an amount equal to 7.5 percent of the 
initial costs of beach restoration, appurtenant drainage 
work, and periodic beach nourishment for a period of 
10 years from the year of initial placement. The 
Federal share of costs for construction, operation, and 
maintenance of the sand transfer plant for its first 10 
years' operation would be 19.3 percent up to October 
23, 1962, and 21.8 percent thereafter. 
Mean tidal range is 2.8 feet. A tide of 7 feet can be 
expected during hurricanes of medium intensity. 
Approved (1970) estimate of cost is $580,000 Federal 
cost and $5,700,000 non-Federal cost. (See Table 9-B 
for Authorizing Legislation.) 
Local cooperation. Local interests must obtain approval 
by the Chief of Engineers of plans and specifications 
and arrangements for prosecution of the work; provide 
lands and rights-of-way; furnish assurances that they 
will assure maintenance of the protective measures and 
periodic nourishment of the protective beach at 
suitable intervals, including operation of the sand 
transfer plant; control water pollution; and continue 
public ownership and use of publicly owned shores and 
assure that the shore eligible for 70 percent Federal 
participation continues to meet the criteria specified in 
P.L. 87-874 for parks and conservation areas. 
Assurances for the construction, operation, and 
maintenance of the sand transfer plant have been 
received and accepted. Assurances for the remainder of 
project have not been furnished. 
Operations and results during fiscal year. New work: Local 
interests were reimbursed in the amount of $13,502 for 
the Federal share of the cost of operation of the sand 
transfer plant during Fiscal Year 1968. 
Condition at end of fiscal year. The project is about 34 
percent completed. Federal participation in the 
operation and maintenance costs of the sand transfer 
plant expired June 30, 1968; however, efforts are being 
made to extend the period of Federal participation. 
30. PINELLAS COUNTY, FLORIDA 
Location. Pinellas County is on the Gulf coast of 
Florida, about midway of the peninsula. It extends 
northerly about 39 miles from the main entrance to 
Tampa Bay to the vicinity of the mouth of Anclote 
River. (See Coast and Geodetic Charts 858 and 1257.) 
Previous project. For details see page 429 of Annual 
Report for 1965. 
Existing project. The authorized project provides for 
Federal participation in preserving and protecting the 
shores of Pinellas County, Florida, by: restoration of 5, 
000 feet of beach at Clearwater Beach Island; 
restoration of 49,000 feet of beach at Sand Key; 
restoration of 9,200 feet of beach at Treasure Island; 
construction of 600 feet of revetment at Long Key; and 
advance nourishment of Long Key and periodic 
nourishment of each island. Estimated cost (1970) is 
$835,000 Federal funds and $4,455,000 non-Federal 
funds. The Federal share is based on minimum Federal 
participation for all of the project area except Treasure 
Island which is based on maximum Federal 
participation. (See Table 9-B for Authorizing 
Legislation.) 
Local cooperation. Local interests must (a) contribute in 
cash the required percentages of the first costs of work 
provided by the Corps of Engineers, the percentages 
varying with the type of beach ownership; 94.1 to 50 
percent of the beach restoration at Clearwater Beach; 
98.1 to 50 percent of the improvement at Sand Key; 
94.3 to 50 percent of the improvement at Treasure 
Island; and 50 percent of the first cost of the revetment 
at Long Key; (b) contribute in cash an amount 
computed in accordance with the cost sharing 
provision contained in P.L. 84-862 Congress, as 
amended by P.L. 87-874, for beach nourishment cost 
for the first 10 years of the project life; (c) provide 
lands, easements, and rights-of-way; (d) assure 
maintenance and repair of the stone revetment on 
Long Key; (e) assure periodic nourishment of the 
restored beaches; (f) assure public ownership of 
beaches; (g) assure against water pollution; (h) hold 
the United States free from damages; and (i) provide 
beach for public use. Estimated non-Federal 
contribution is estimated at $4,455,000 Assurances of 
local cooperation were accepted March 22, 1967. 
Operations and results during fiscal year. New work: 
Emergency repair of storm damage at Indian Rocks 
Beach and Treasure Island and operations for 
providing initial beach fill at Treasure Island were 
completed July 18, 1969. Costs for providing initial fill 
at Treasure Island were $480,698. Supervision and 
administration costs were $3,895. Emergency repair 
work was sponsored by Office of Emergency 
Preparedness. 
Conditions at end of fiscal year. Construction of the 
project commenced April 10, 1969 and is 31 percent 
completed. Total Federal costs under existing project 
)1 
451-584 0-72-20

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
through June 30, 1970 were $262,383 (excluding $27, 
740 for preauthorization studies) for new work. 
31. VIRGINIA KEY AND KEY BISCAYNE, 
FLA. 
Location. The authorized project is located on islands 
off the southeast coast of Miami, Florida, bordered on 
the east by the Atlantic Ocean and on the west by 
Biscayne Bay. The shoreline covered by the project is 
about 3.7 miles long. (See Coast and Geodetic Survey 
Chart 1248.) 
Existing project. The project provides for Federal 
participation of 70 percent of the cost of periodic 
nourishment of 1.8 miles of beach on Virginia Key and 
1.9 miles of beach on Key Biscayne for an initial period 
of 10 years, and 70 percent of the initial cost of three 
groins on Virginia Key and one groin on Key Biscayne, 
construction of which is subject to future determination 
of their need. Mean range of tide in the Atlantic Ocean 
at Miami Beach is 2.5 feet. Estimated cost (1970) is $2, 
200,000 Federal funds and $950,000 non-Federal 
funds. (See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local interest must (a) contribute in 
cash 30 percent of the periodic nourishment costs for 
the first 10 years of project life (estimated at $950,000) 
and 30 percent of deferred construction costs of groins; 
(b) control water pollution; (c) maintain continued 
public ownership of the shore; (d) provide lands and 
rights-of-way; (e) hold the United States free from 
damages; (f) provide a beach zone prohibiting 
permanent human habitation; (g) provide recreational 
beaches; (h) satisfy adequate criteria for conservation 
and development of natural resources of the 
environment; (i) extend said area landward a sufficient 
distance to include, where appropriate, protective 
dunes, bluffs, or other natural features which serve to 
protect the uplands from damage; (j) provide full park 
facilities; (k) the above items shall meet with the 
approval of the Chief of Engineers; and (1) should 
groins be constructed, local interests must meet 
conditions a through e above, maintain groins, and 
provide related beach nourishment as may be 
necessary. Basic and supplemental assurances of local 
cooperation were accepted June 7, 1965, and May 15, 
1967, respectively. 
Operations and results during fiscal year. New work: 
Operations for placing fill material on beaches were 
completed July 10, 1969, at a cost of $30,244 for the 
year. Engineering and design and supervision and 
administration costs were $590 and $2,410, 
respectively. 
Condition at end of fiscal year. Construction of the 
project commenced January 9, 1969. The project is 18 
percent completed. 
32. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECTS 
(See table 9-I.) 
33. BEACH EROSION CONTROL 
ACTIVITIES PURSUANT TO SECTION 
103, PUBLIC LAW 87-874 
(PREAUTHORIZATION) 
(See Table 9-J.)
FLOOD CONTROL 
34. CENTRAL AND SOUTHERN FLORIDA 
Location. The project is located generally within the 
southeastern eighteen counties of Florida covering an 
area of about 15,200 square miles. It is comprised of the 
Upper St. Johns River basin in the northeastern section 
of project, Kissimmee River basin in central section 
above the Lake Okeechobee-Everglades area in the 
central and southwestern section, and the east coast 
Everglades area in southeastern section. 
Previous projects. Completed works for control of Lake 
Okeechobee were included in and constructed under 
the navigation project for Okeechobee Waterway, Fla. 
(formerly Caloosahatchee River and Lake Okeechobee 
drainage areas, Fla.), and under provisions of River 
and Harbor Acts of July 3, 1930, and August 30, 1935. 
For further information, see Annual Reports, 1948 and 
1949. 
Existing project. The project is for flood relief and 
water conservation and provides principally for: an 
east coast protective levee extending from the 
Homestead area north to the eastern shore of Lake 
Okeechobee near the St. Lucie Canal; three 
conservation areas for water impoundment in the 
Everglades area west of the east coast protective levee 
with control structures to effect transfer of water as 
necessary; local protective works along the lower east 
coast; encirclement of the Lake Okeechobee 
agricultural area by levees and canals; enlargement of 
portions of Miami, North New River, Hillsboro, and 
West Palm Beach Canals; enlargement of the existing 
Lake Okeechobee levees and construction of new levees 
on the northeast and northwest shore of the lake; 
increased outlet capacity for improved control of Lake 
Okeechobee; floodway channels in the Kissimmee 
River basin, with suitable control structures to prevent 
overdrainage; an interrelated system of canals, levees, 
pumping stations, and structures in southwest Dade 
County to control water levels; and facilities for 
regulating floods in the Upper St, Johns River basin; a 
system of canals and control structures for gravity 
drainage of Martin County and distribution of 
available water supplies to portions of Martin and St. 
Lucie Counties; and works to improve the supply, 
distribution, and conservation of water resources in 
central and southern Florida, including the Lake 
Okeechobee agricultural area, Everglades National 
Park, and other related areas. The project will provide 
water control and protection from recurrence of the 
devastating floodwaters from the Everglades and local 
sources, for the highly developed urban area along the 
302

JACKSONVILLE, FLA., DISTRICT 
lower east coast of Florida and for the productive 
agricultural areas around Lake Okeechobee (including 
towns around lake), in the Upper St. Johns and 
Kissimmee River basins, and in South Dade County. 
The project includes a total of 1,030 miles of levees, 
1,014 miles of canals, 32 pumping plants, 200 floodway 
control and diversion structures, and 62 railroad 
relocations (bridges). 
The project also provides that upon completion, 
local interests assume operation and maintenance of all 
completed works except levees, channels, locks, and 
control works for regulation of Lake Okeechobee and 
the main control structures of conservation areas, 
which will be operated and maintained by the United 
States. 
The principal features of the hurricane gates, 
constructed under previous projects for Okeechobee 
Waterway and maintained under existing project since 
July 1, 1950, are set forth in Table 9-K. See also Table 
9-U for principal features of locks and dam. 
Estimate of cost for new work (1970) is $363,000,000 
Federal funds and $79,500,000 contributed funds, 
exclusive of river and harbor funds expended on 
previous projects. Local interests' costs in reviewing 
plans and specifications are expected to be $360,000. In 
addition, estimated cost to local interests of lands, 
rights-of-way, and relocations is $75,240,000. (See 
Table 9-B for Authorizing Legislation.) 
Local cooperation. (See Table 9-L for local cash 
contribution.) Local interests must also: provide lands, 
rights-of-way, spoil disposal areas; hold the United 
States free from damages; bear the cost of maintenance 
and operation of all works except those having to do 
with regulation of Lake Okeechobee and the main 
control structures of conservation areas; construct and 
maintain lateral drainage facilities; prohibit 
encroachment on flood-carrying capacity of the 
improved channels; and assume cost of construction of 
all new highway bridges, relocations of existing bridges, 
and alterations to utilities incident to construction of 
the project. 
Assurances of local cooperation have been accepted 
by the District Engineer for all items of worlk 
authorized to date except those authorized by the 1968 
Flood Control Act. 
Total estimated contributed funds amount to $79, 
500,000. 
Operations and results during fiscal year. (See Table 9-M 
for work accomplished.) 
Operating and care. Features completed under previous 
navigation project for Okeechobee Waterway and 
being maintained under this project are: a levee about 
70 miles long following in general the south shore of 
Lake Okeechobee and a north shore levee 15.8 miles 
long; spillways at Ortona and St. Lucie locks; 5 
hurricane gates; 20 gated drainage culverts through 
the levee; and 16 spillways along St. Lucie Canal. 
Features completed under existing project that are to 
be maintained with operation and maintenance funds 
are: (1) Levees 47, 48, 49, and 50-total length 63 miles 
and enlargement of existing levees L-D1, L-D2, L-D3, 
L-D4, and L-D9, (2) spillway structures S-10, S-11, S- 
12, S-18C, S-77, and S-78, (3) C-43 Sec. 4 
(Caloosahatchee River), and (4) W. P. Franklin Lock 
and Dam. 
In addition to the actual facilities listed above it is 
necessary under Operation and Maintenance to 
continue meteorological studies, water level records, 
stream gaging stations, etc., for proper regulation of the 
level of Lake Okeechobee and storage of water in 
Conservation Areas 1, 2, and 3. 
Regulation. 
a. General. Fiscal Year 1970 was a wet year over most 
of the project area. In October and again in March 
rainfalls, ranging from the high of record to no lower 
than the 4th highest of record for those months, 
occurred over most of the project area. These rainfall 
amounts ranged from 8.3 to 13.9 inches in October and 
from 8.4 to 12.4 inches in March. A drought of 53 days' 
duration followed the March rainfall during which 
little or no rainfall was recorded over a large portion of 
the project area. A new interim water delivery schedule 
to the Everglades National Park was adopted in 
February. This schedule sets the minimum monthly 
amounts of water to be released to the park based on 
Lake Okeechobee stage and the stage on the P-33 gage 
located in the park. During this fiscal year the 
Everglades National Park received a total of 2,123,790 
acre-feet of water from the project. In addition over 5.0 
million acre-feet of water was released from the 4 major 
project storage areas to tidewater. At the end of the 
fiscal year all of these storage areas were slightly above 
their scheduled stage. 
b. Corps of Engineers. 
(1) Lake Okeechobee. Rainfall on the lake totaled 60.97 
inches for the fiscal year, which was 11.09 inches above 
normal. The October rainfall, 9.1 inches, was the 
fourth highest October of record and the March 
rainfall, 12.4 inches, was the highest March of record. 
Inflow to Lake Okeechobee for the fiscal year totaled 4, 
273,000 acre-feet, equivalent to 9.3 feet of storage on 
the lake. Of this total 1,743,000 acre-feet occurred 
during the months of October and March. Net water 
supply for the fiscal year amounted to 4,900,000 acrefeet, 
which was 272 percent of normal. Stages on the 
lake reached a peak of 16.6 feet on November 2, 1969, 
and 16.8 feet on April 2, 1970. On both occasions stages 
were returned to schedule within 30 to 35 days 
following the peak. Emergency closure of Hurricane 
Gate No. 6 was made following the March storm to 
reduce the health hazard to the city of Okeechobee 
caused by overflowing septic tanks and drainfields. The 
landside stage was reduced from 16.6 feet to 15.0 feet 
and held for 24 days by Pumping Station No. 133 until 
the lake could be returned to a safe level. This action 
303

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
was made possible due to the drought that followed the 
March rains, as S-133 was pumping a drainage area 
much larger than it was designed for. Regulatory 
releases from Lake Okeechobee through the St. Lucie 
Canal totaled 1,837,000 acre-feet, and through the 
Caloosahatchee River 2,564,000 acre-feet, a total of 4, 
401,000 acre-feet for the fiscal year. Additional releases 
of 479,000 acre-feet were made via the agricultural 
canals for regulatory and irrigation purposes. A new 
interim regulation schedule which raised the lower 
limits of the schedule from 13.5 feet to 14.0 feet was 
approved in May for use during the calendar year 
1970. 
(2) Water Conservation Area No. 1 was above schedule 
more than half the fiscal year. The net water supply to 
the area amounted to 833,190 acre-feet. Rainfall for 
this period totaled 57.66 inches, which was 1.18 inches 
above normal. The October rainfall amount of 8.3 
inches was the fourth highest of record for October and 
the March total of 9.8 inches was the highest March of 
record. In contrast, the April total of 0.3 inch was the 
fourth lowest of record. The peak stage reached during 
the fiscal year was 17.9 feet on November 4, 1969. 
Regulatory releases of 605,400 acre-feet were 
transferred to Water Conservation Area 2A through S- 
10. Releases to the east, including seepage and 
regulatory releases to tidewater, totaled 239,710 acrefeet. 
(3) Water Conservation Area 2A had a net water supply 
of 1,430,990 acre-feet for the year. It was above 
schedule 9 months during the year, reaching a peak 
stage of 15.4 feet on November 4, 1969. In April 1970, a 
new interim regulation schedule was tentatively 
approved by higher authority which raised the lower 
limits of the seasonal regulation schedule from 12 to 13 
feet. Rainfall over the area totaled 62.59 inches for the 
year, 11.75 inches above normal. The monthly rainfall 
total for October, 10.2 inches, and March, 9.0 inches, 
were near record highs for those months. Regulatory 
releases through S-11 to Area 3A totaled 633,120 acrefeet. 
Releases to the east, including seepage, irrigation 
and regulatory releases to tidewater totaled 448,140 
acre-feet. Regulatory releases to tidewater were made 
during 8 months of the fiscal year to help relieve high 
stages in the deer area in Water Conservation Area 3A. 
These releases are estimated to total 285,000 acre-feet 
for the fiscal year. 
(4) Water Conservation Area 3A was above schedule all 
but 17 days during the fiscal year. Net water supply to 
the area totaled 2,516,140 acre-feet. Rainfall totaled 
62.01 inches for the fiscal year, 11.58 inches above 
normal. The monthly total rainfalls for October, 13.9 
inches, and for March, 8.4 inches, were period of record 
highs for those months. In contrast the April rainfall 
0.06 inch was the second lowest April rainfall of record, 
2.5 inches below normal. A peak average stage of 11.55 
feet was reached in the area on November 1, 1969. This 
was 1.05 feet above the scheduled stage of 10.5 feet. A 
total of 2,138,790 acre-feet was discharged through the 
S-12 Spillway to the Everglades National Park during 
the fiscal year. The 24 gates in this spillway were open 
clear of water a total of 325 days during this period. 
Daily discharges ranged from a high of 4,780 c.f.s. to a 
low of 1,900 c.f.s. with the gates open full. Lesser 
amounts ranging from 38 c.f.s. to 1,090 c.f.s. were 
released during the other 40 days. As conditions in the 
Miami Area permitted during the latter part of the 
year, additional regulatory releases were made from 
Area 3A via Miami Canal and S-151 to tidewater. 
These releases totaled 135,400 acre-feet. Estimated 
seepage to the east from Area 3A for the fiscal year 
totaled 577,600 acre-feet. 
c. Central and Southern Florida Flood Control District. 
Project canals, structures, and pumping stations were 
operated by the Flood Control District in accordance 
with design criteria to supply irrigation water to the 
agricultural areas, maintain desirable canal levels, and 
prevent salinity problems in coastal areas. During the 
fiscal year about 1,689,665 acre-feet of water was 
pumped by the Flood Control District as follows: 456, 
615 acre-feet to Lake Okeechobee, 770,110 acre-feet to 
Water Conservation Area No. 1, 222,300 acre-feet to 
Water Conservation Area 2A, 240,640 acre-feet to 
Water Conservation Area 3A. The Central and 
Southern Florida Flood Control District released from 
Lake Okeechobee 479,000 acre-feet of water via the 
agricultural canals for irrigation and to assist in 
regulation of Lake Okeechobee. A total of 660,470 
acre-feet was released from Water Conservation Areas 
1, 2A, and 3A to tidewater to assist in the regulation of 
these areas. 
Condition at end of fiscal year. The project was about 48 
percent complete. Planning for the entire project was 
begun in November 1948 and has been continued. For 
construction completed prior to Fiscal Year 1970, see 
Annual Reports for 1960-1969. Construction 
completed under existing project during fiscal year is 
set forth in Table 9-N. All Federally maintained 
features of the project were generally in good condition 
at the end of the fiscal year. (For status of work under 
contract at end of fiscal year see table 9-0.) 
Total Federal costs under existing project through 
June 30, 1970, were $175,305,763 for new work 
(excluding $906,797 preauthorization studies), $4,667, 
226 for maintenance, and $1,125,450 for operation and 
care, a total of $181,098,439. In addition, $33,301,583 
has been expended from contributed funds for new 
work. 
35. FOUR RIVER BASINS, FLA. 
Location. The Four River Basins area covers about 6, 
000 square miles within 14 counties in central and 
southwest peninsular Florida. Project includes all or 
part of the four main stream basins-the Hillsborough, 
Oklawaha, Withlacoochee, and Peace Rivers-and all 
of three smaller coastal basins north of Tampa, Florida, 
304

JACKSONVILLE, FLA., DISTRICT 
drained by the Pithlachascotee and Anclote Rivers and 
Lake Tarpon. 
Existing project. The authorized project provides for 
improvements for control of floods and drainage, and 
for water conservation through construction of 
necessary canals, levees, reservoirs, and control 
structures. More specifically, the project provides for: 
Green Swamp Area -a conservation area and three 
storage reservoirs with necessary canals and control 
structures; 
Hillsborough River -four flood-storage reservoirs, with 
necessary channels, control structures, and levees; 
Oklawaha River -a levee on the north shore of Lake 
Apopka, improvement of part of the river channel and 
a west bank levee below Moss Bluff lock and dam, and 
replacement of the lock and dam; 
Withlacoochee River -one flood-storage reservoir with 
outlet canals and control structures; 
Peace River -Peace Creek canal and control structures 
and improvements to the existing water control and 
drainage features; 
Gulf Coastal Areas -Lake Tarpon: outlet canal and 
control structure; Anclote River: control structure and 
channel improvement; Pithlachascotee River: 
reservoir with outlet canals and control structures. (See 
Table 9-P on Moss Bluff Lock.) 
Estimated cost for new work (1970) is $64,300,000 
Federal funds and $44,200,000 contributed cost ($12, 
000,000 contributed funds and $32,200,000 for other 
costs). (See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local interests must furnish all 
lands, and rights-of-way; provide all alterations or 
replacements of public and private utilities, roads, 
bridges (except railroad bridges), etc,; hold the United 
States free from damages; operate and maintain all 
project works after completion; construct and maintain 
such associated works as are necessary to realize 
benefits made available by the project works; and 
contribute in cash 17 percent of the first cost of 
construction ($12,000,000). 
Operations and results during fiscal year. New work: 
Construction of Moss Bluff Lock and Dam and the 
Seaboard Coast Line Bridge (B-194) over Tampa 
Bypass Canal was completed November 15, 1969, and 
March 19, 1970, respectively, at contract costs of $40, 
739 and $423,053, respectively. Construction of Tampa 
Bypass Canal from U. S. Highway 41 to the Seaboard 
Coast Line Railroad and levee along the Oklawaha 
River at approximately miles 1 to 7 from the river's 
junction with the Cross Florida Barge Canal 
continued. Contract costs were $571,306 and $389,790, 
respectively. 
Construction of Masaryktown Canal (C-534) started 
June 18, 1970; however, no contract costs were 
incurred. Contracts for construction of remaining 
portion of levee on Oklawaha River and for 
construction of Lake Tarpon Canal Spillway and 
structure were awarded May 28 and June 16, 1970, 
respectively. Construction has not started. 
Alteration of facilities at the Seaboard Coast Line 
Bridge (B-194) were made at a contract cost of $53,162. 
Adjustment in Lake Tarpon Canal contract 
amounted to (-) $1,055. 
Engineering and design and supervision and 
administration costs were $608,037 and $125,369, 
respectively. 
Condition at end of fiscal year. Construction of the 
project commenced April 18, 1966, and is 16 percent 
complete. See Table 9-Q for construction of major 
features of the project completed to date: 
36. HOGTOWN CREEK, FLA. 
Location. Hogtown Creek is on the west side of 
Gainesville, Florida, and drains an area of about 22 
square miles into a sinkhole. Clear Lake Basin is a 
tributary to Hogtown Creek and has a drainage area of 
about 470 acres. 
Existing project. The project provides for a levee and a 
100 c.f.s. pumping station for protection of the Clear 
Lake area. 
Estimated cost of new work (1968) is $259,400 
Federal funds and $161,600 contributed cost ($51,600 
contributed funds and $110,000 for lands). (See Table 
9-B for Authorizing Legislation.) 
Local cooperation. Local interests must: furnish all 
lands and rights-of-way; hold United States free from 
damages; maintain and operate project after 
completion; contribute in cash 16.6 percent of 
construction costs; prevent future encroachment which 
might interfere with proper functioning of the project 
for flood control; and prevent future construction of 
homes in the protected area with floor elevations below 
59.0 feet, mean sea level. Assurances of local 
cooperation were accepted December 18, 1968. 
Operations and results during fiscal year. New work: Plans 
and specifications for construction of the project are 80 
percent complete. Engineering and design and 
supervision and administration costs were $1,490 and 
$186, respectively. 
Condition at end of fiscal year. Construction of the 
project has not commenced. 
37. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
The following features transferred to the Central and 
Southern Florida Flood Control District and the 
Southwest Florida Water Management District were 
inspected quarterly during the year at a total cost of 
$11,112: 14 pumping stations, approximately 107 
control structures, approximately 567 miles of canals, 
approximately 621 miles of levees, and improvements 
of Arch Creek, including control structure. 
305

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
38. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 9-R.) 
39. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood Control Activities Pursuant to Section 205, Public Law 
685, 84th Congress, as amended (Preauthorization) 
(See Table 9-S.) 
Emergency Flood Control Activities - repair, flood fighting, 
and rescue work (Public Law 99/84/1 and antecedent 
legislation) 
Federal costs for Fiscal Year 1970 were $9,234 for 
Advance Preparation for Flood Emergencies; $2,213 in 
connection with hurricane alert for Hurricane Gladys; 
$727 for past-flood report on Yaguez River, Mayaguez, 
P.R.; $668 for reconnaissance investigation of flood 
condition in South Florida; and $4,076 and $4,802 for 
engineering services in connection with emergency 
beach nourishment at Treasure Island and Indian 
Rocks Beach, Florida, respectively. 
GENERAL INVESTIGATIONS 
40. SURVEYS 
Hired labor costs during the fiscal year (all Federal 
funds) were: navigation studies, $131,017; flood control 
studies, $179,026; beach erosion studies, $84,608; and 
special studies, $7,740, for a total of $402,391. 
41. COLLECTION AND STUDY OF BASIC 
DATA 
Hired labor costs for flood plain management 
services incurred during the fiscal year were: Palm 
Beach County (Hillsboro Canal), Florida, $25,957; 
Palm Beach County, Fla. (coastal areas), $4,307; 
Seminole County, Little Wekiva River, Fla., $13,742; 
Upper St. Johns River, Fla. (Little Wekiva River near 
Orlando), $8,089; Sanford, Lake Monroe, Fla., $4,388; 
Orlando, Fla., $8,370; Manaubo River, Puerto Rico, 
$24,463; Flood Plain Management Services 
(Jacksonville District), $41,033; Flood Plain 
Management Services (SAD), $32,745; and Flood 
Plain Management Services (Technical), $9,132; (See 
Table 9-T for Flood Plain Management Services 
Completed to Date.) 
306

TABLE 9-A 
See 
Section 
in Text Project 
1. Aquatic Plant 
Control (R&H 
Act of 1965) 
(Federal Funds) 
(Contrib. 
Funds) 
2. Bayport, Fla. 
3. Canaveral Harbor, 
Fla. 
(Federal Funds) 
4. Channel from Naples 
to Big Marco Pass: 
12-foot Channel 
Gordon Pass to 
Naples, Fla. 
(Federal Funds) 
5. Charlotte Harbor, 
Fla. 
6. Clearwater Pass, 
Fla. 
7. Cross-Florida 
Barge Canal 
(Federal Funds) 
8. Eau Gallie 
Harbor, Fla 
9. Fernandina Harbor, 
Fla. 
10. Fort Myers 
Beach, Fla. 
(Federal Funds) 
11. Intracoastal 
Waterway, 
Caloosahatchee 
River to Anclote 
River, Fla. 
Funding 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
JACKSONVILLE, FLA., DISTRICT 
COST AND FINANCIAL STATEMENT 
Total to 
FY 67 FY 68 FY 69 FY 70 June 30, 1970 
$ 4,000 $ 371,000 $ 249,000 $ 233,127 
3,970 358,267 229,874 233,256 
108,485 
108,485 
-81,000 
83,525 
25,000 
1,594 
112,442 
111,421 
63,500 
59,054 
13,810,000 
12,971,521 
51,000 
49,189 
10,200 
50,292 
748,055 
756,075 
23,175 
23,393 
40,000 
32,107 
48,665 
49,356 
-1,175 
22,231 
98,300 
100,643 
2,776 
7,222 
10,680,000 
11,209,423 
76,000 
63,106 
187,268 
187,506 
-5,434 
500,000 
106,494 
30,000 
28,201 
84,008 
84,008 
42,800 
31,888 
140,000 
33,788 
135,827 
135,835 
73,500 
4,400,000 
4,839,828 
387,000 
306,557 
98,621 
98,621 
26,000 
14,682 
150,000 
29,066 
62,307 
51,707 
75,379 
74,727 
-396 
73,103 
1,903,000 
2,369,345 
746,128 
760,167 
36,628 1,250 
34,059 3,819 
76,699 113,169 
77,933 112,344 
7,355 
2,201 
2,201 
306,945 
87,200 
88,766 
2,287 
-1,400 
97,264 
307,742 
265,570 
$ 857,127 
825,367 
291,114 
291,114 
68,8002 
46,5702 
6,833,5103 
6,501,426 
305,2904 
305,2904 
138,856 
128,256 
533,1695 
533,1695 
1,761,070 
1,760,418 
46,3496 
46,3496 
145,220 
145,219 
47,478,1487 
46,481,9427 
1,209,128 
1,129,830 
9,627 
9,627 
38,373 
38,373 
3.288,816 
3,288,816 
2,173,540 
2,172,377 
96,0408 
94,455 
54,702 
54,702 
8,154,4579 
8,049,888 
1,312,267 
1,269,8621 
307

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 9-A (Continued) 
See 
Sect 
in T 
12. 
tion 
ext Project 
Intracoastal 
Waterway, 
Jacksonville to 
Miami, Fla. 
13. Jacksonville 
Harbor, Fla. 
(Contrib. 
Funds) 
14. Manatee 
River, Fla. 
15. Melbourne 
Harbor, Fla. 
16. Miami Harbor, 
Fla. 
(Federal Funds) 
17. Qkeechobee 
Waterway, Fla. 
18. Oklawaha 
River, Fla. 
19. Palm Beach Harbor, 
Fla. 
(Federal Funds) 
20. Pithlachascotee 
River, Fla. 
COST AND FINANCIAL STATEMENT 
Total to 
Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work:. 
Approp. 
Cost 
$ 410,000 
542,347 
392,500 
323,965 
53,100 
54,929 
495,640 
265,552 
3,173 
3,173 
45,000 
7,994 
231,500 
207,281 
31,400 
25,251 
2,125,000 
2,484,861 
107 
491 
-35,454 
2,111 
207,000 
224,199 
20,300 
26,065 
903,000 
914,896 
1,400 
1,400 
30,000 
1,092 
285,000 
307,061 
80,000 
78,109 
638,410 
1,141,384 
- 
382 
303,684 
234,650 
700,000 
57,681 
489,709 
527,574 
17,290 
33,000 
12,055 
36,816 
34,232 
2,057 
2,057 
41,000 
21,612 
436,000 
247,806 
17,800 
17,766 
-710
17 
124,347 
41,091 
29,806 
23,708 
365,452 
371,877 
-545,000 
36,570 
. 648,925 
940,457 
21,741 
42,589 
1,932 
4,516 
6,712 
6,468 
37,800 
15,225 
444,320 
524,415 
3,640 
4,417 
191,310 
263,331 
10,000 
6,435 
308 
$19,268,03111 
19,248,598 
8,599,52812 
8,461,81212 
16,233,29113 
16,172,48013 
19,135,93714 
19,121,403 
102,813 
102,813 
17,290 
123,350 
123,350 
160,542 
160,445 
17,696 
17,696 
41,921 
41,921 
9,636,6131 
s 
9,636,6131s 
2,068,148 
2,067,904 
20,171,29216 
20,128,70816 
11,998,27717 
11,874,712 
315,26418 
315,264 
1,173,97719 
1,173,908 
6,904,031 
6,904;031 
1,639,08521 
1,627,850 
40,000 
36,241

TABLE 9-A (Continued) 
JACKSONVILLE, FLA., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
21. Ponce de Leon 
Inlet, Fla. 
(Federal Funds) 
(Contrib. 
Funds) 
22. Ponce Harbor, 
Puerto Rico 
23. Removing Water 
Hyacinth 
(Federal Funds) 
24. St. Lucie 
Inlet, Fla. 
25. Tampa Harbor, 
Fla. (Main 
Project) 
29. Palm Beach 
County from 
Lake Worth Inlet 
to South Lake 
Worth Inlet, Fla. 
(Federal Funds) 
(Contrib. 
Funds) 
30. Pinellas County, 
Fla. 
(Federal Funds) 
(Contrib. 
Funds) 
31. Virginia Key 
and Key Biscayne, 
Fla. 
(Federal Funds) 
(Contrib. 
Funds) 
34. Central and 
Southern Florida 
(Federal Funds) 
(Contrib. 
Funds) 
Total to 
FY 67 FY 68 FY 69 FY 70 June 30, 1970 
$ 60,000 $ 400,000 
32,655 4,897 
- 1,520,730 
- 45,711 
Funding 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
82,000 
90,776 
134,213 
135,405 
345,000 
286,597 
6,800 
6,798 
3,385 
3,385 
24,385 
24,385 
25,000 
24,270 
221,700 
24,359 
9,840 158,580 
1,639 10,440 
12,625,000 10,892,000 
14,796,988 9,370,806 
378,500 413,300 
392,635 456,408 
2,721,330 1,845,282 
2,990,638 1,849,119 
$776 934 $251,400 
625,286 480,051 
- 290,970 
761,157 584,364 
80,000 
68,942 
47,065 
45,087 
-38,979 
402 
449,500 
815,191 
10,720 
10,720 
1,334 
1,334 
38,458 
38,458 
169,280 
3,825 
7,229 
6,930 
239,479 
245,491 
42,328 
40,476 
30,423 
31,649 
4,800 
13,502 
48,434 
48,434 
-8,773 
242,296 
4,383 
242,297 
12,973 
23,271 
502 
9,973 
6,073,000 
7,971,824 
751,687 
726,599 
1,075,032 
1,323,468 
$1,488,33422 
1,142,88922 
1,811,700 
1,391,232 
187,88223 
187,88223 
121,096 
120,797 
2,944,870 
2,913,134 
123,60224 
123,60224 
452,428 
450,399 
26,042,20325 
26,042,20325 
5,999,54126 
5,999,44026 
195,14027 
195,14027 
5,827 
5,827 
781 18828 
781,18828 
266,227 
262,3839 
262,383 
262,383 
403,95330 
403,95330 
173,12231 173,122 
176,421,99732 
175,305,763 
5,839,661 
5,792,676 
34 141,972 
33,301,583 
309 
305,000 
272,570 
165,100 
165,709 
416,491 
574,379 
8,700 
452 
452 
250,000 
-4,183 
258,000 
20,086 
352,498 
4,200 
151,070 
9,870,000 
8,970,850 
512,700 
552,400 
2,186,232 
1,787,734

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABEE 9-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
35. Four River New Work: 
Basins, Fla. Approp. $1,750,000 $ 2,635,000 $ 3,280,000 $1,712,000 $ 10,459,20033 
(Federal Funds) Cost 1,594,341 2,755,720 3,154,569 1,945,830 10,012,432 
(Contrib. New Work: 
Funds) Approp. 293,199 521,781 675,070 143,140 1,732,640 
Cost 254,917 504,519 561,601 264,571 1,590,037 
36. Hogtown New Work: 
Creek, Fla. Approp. - 12,000 19,815 - 79,315 
Cost 13,142 2,194 14,677 1,676 58,482 
1. Work-in-kind. 
2. Includes cost of reconnaissance and detailed project 
reports. 
3. Includes $29,680 for preauthorization studies; $700,000 
contributed by NASA in connection with construction of lock; 
and $1,003,000 contributed funds for new work. 
4. Excludes $42,083 for preauthorization studies and 
$159,975 contributed funds. 
5. Includes $113,000 for new work on previous project; 
excludes $12,230 preauthorization studies and $15,563 expended 
for new work on existing project from contributed 
funds. 
6. Excludes $40,000 for preauthorization studies and 
$42,783 contributed funds. 
7. Excludes $20,000 for preauthorization studies. 
8. Includes cost of reconnaissance and detailed project 
reports prepared under Section 107 modification to the project. 
Excludes $22,300 cost of preauthorization studies and $1,095 
contributed funds for new work. 
9. Includes $515,479 for new work for previous projects; 
$8,472 for new work on Sunshine Skyway Channel; and $9,707 
for new work for Cats Point Channel. Excludes $60,000 for 
preauthorization studies and $14,473 contributed funds for new 
work. 
10. Includes $450,749 for maintenance for previous project. 
11. Includes $94,776 for work for previous projects; excludes 
$20,000 for preauthorization studies. 
12. Includes $213,222 for maitenance on previous projects 
and $3,179 operating and care under provisions of permanent 
indefinite appropriation. 
13. Includes $3,520,137 new work on previous project and 
$290,013 for new work expended from public works funds. 
14. Includes $543,399 maintenance on previous projects. 
15. Includes $2,202,126 expended from public works funds 
for new work; excludes $161,254 for preauthorization studies; 
$322,889 contributed funds; and $343,497 work-in-kind by 
local interests. 
16. Includes $16,222,275 for new work under previous 
project, $65,003 for recreational facilities (Code 710), and cost 
of reconnaissance and detailed project reports prepared under 
Section 107 modification to the project. Excludes $500,000 for 
new work from contributed funds on previous project. 
17. Includes $7,581,150 for maintenance for previous projects. 
Excludes $1,000 for maintenance from contributed funds 
on previous projects and $67,558 which represents services 
rendered without reimbursement. 
18. Includes $3,912 for new work for previous projects. 
19. Includes $11,414 for operating and care under provisions 
of the permanent indefinite appropriation. 
20. Includes $80,000 new work from public works funds. 
Excludes $52,000 for preauthorization studies and $509,506 
contributed funds. 
21. Includes $30,000 for maintenance from public works 
funds. 
22. Excludes $45,918 preauthorization studies. 
23. Includes $11,588 expended for restudy but excludes 
$21,960 expended for new work from contributed funds. 
24. Includes $26,689 for new work under previous project. 
25. Includes $853,050 for new work under previous project. 
Excludes $27,358 for preauthorization studies; $270,466 for 
new work for Hillsborough River; and $13,939 for new work 
from contributed funds. 
26. Includes $17,107 for maintenance under previous project. 
27. Excludes $26,350 preauthorization studies. 
28. Includes property or services in lieu of cash contribution 
but excludes $26,350 for preauthorization studies. 
29. Excludes $17,000 for preauthorization studies for previous 
project and $27,740 for existing project. 
30. Excludes $12,598 for preauthorization studies. 
31. Excludes $12,750 for preauthorization studies. 
32. Excludes $706,797 for preauthorization studies; $15,543 
for property received without reimbursement, and R&H funds 
expended on previous projects (see cost and financial statement 
for Okeechobee Waterway, Fla., project for these costs). 
33. Excludes $342,490 for preauthorization studies. 
34. Includes $44,282 for reconnaissance and detailed project 
reports. 
310

JACKSONVILLE, FLA., DISTRICT 
Work Authorized 
NAVIGATION PROJECTS 
October 27, 1965 
Auth. by Chief of Engineers 
April 10, 1970, under Sec. 
107 of 1960 R&H Act 
March 2, 1945 
October 23, 1962 
June 20, 1938 
July 14, 1960 
July 25, 1912 
March 3, 1925 
July 3, 1930 
August 26, 1937 
May 17, 1950 
AQUATIC PLANT CONTROL (See Section 1 of Text) 
Control and progressive eradication of obnoxious aquatic 
plants, and continued research to develop best method of 
control 
BAYPORT, FLA. (See Section 2 of Text) 
Channel 6 x 75 foot from turning basin at Bayport Park to 
6-foot contour in Gulf of Mexico 
CANAVERAL HARBOR, FLA. (See Section 3 of Text) 
Entrance channel, jetties, a turning basin enclosed by a 
dike, and a barge canal with a lock. 
Maintain improved channel, turning basin, enlarge barge 
channel and lock, relocate dike, provide channel and 
turning basin west of 35-foot turning basin, construct 
and operate sand-transfer plant. 
CHANNEL FROM NAPLES TO BIG MARCO PASS: 
12-FOOT CHANNEL GORDON PASS TO NAPLES, 
FLA. (See Section 4 of Text) 
Interior channel 6 x 70 feet 
Channel 12 x 150 feet from Gulf to Gordon Pass, thence 10 x 
100 feet to point 400 feet south of U.S. Highway 41 bridge, 
thence 10 x 70 feet to bridge; and two turning basins 
CHARLOTTE HARBOR, FLA. (See Section 5 of Text) 
Channel 24 x 300 feet through Gulf through Boca Grande 
entrance 
Depth of 27 feet at entrance and width of 500 feet at the bend 
Channel 10 x 100 feet to Punta Gorda and a turning basin 
Depth of 30 feet at entrance and width of 700 feet at bend 
Depth of 32 feet in entrance channel 
HD 251/89/1 
HD 367/77/1 
SD 140/87/2 
HD 596/75/3 
HD 183/86/1 
HD 699/62/2 
HD 113/66/1 
R&H Comm. D 1/70/1 
R&H Comm. D 95/74/2 
HD 186/81/1 
CLEARWATER PASS, FLA. (See Section 6 of Text) 
July 14, 1960 Entrance channel 10 x 150 feet, inside channel 8 x 100 
feet, and a turning basin 
CROSS-FLORIDA BARGE CANAL (See Section 7 of Text) 
P.L. 675/77, Barge Canal 12 x 150 feet 
July 23, 1942 
EAU GALLIE HARBOR, FLA. (See Section 8 of Text) 
June 20, 1938 Channel 8 x 100 feet and turning basin 
FERNANDINA HARBOR, FLA. (See Section 9 of Text) 
Entrance jetties 
Raising and extending jetties to provide 19 foot depth 
Improvement of inner harbor to obtain 20 to 24 foot depth 
and 400 to 600 foot channel width 
Combining improvement of Fernandina Harbor and Cumberland 
Sound under the general heading of Fernandina Harbor 
Provided for a 26-foot channel 
A.R. 1879 
A.R. 1891 & 1896 
HD 388/59/1 
HD 227/68/1 
311 
TABLE 9-B
Acts 
AUTHORIZING LEGISLATION 
Documents 
HD 293/86/2 
HD 109/79/1 
HD 497/75/3 
June 14, 1880 
July 13, 1892 
March 2, 1907 
June 25, 1910 
March 3, 1925

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 9-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 20, 1938 
March 2, 1945 
May 17, 1950 
July 14, 1960 
Auth. by Chief of Engineers 
December 6, 1968, under Sec. 
107 of 1960 R&H Act 
March 2, 1945 
June 30, 1948 
May 17, 1950 
September 3, 1954 
May 10-16, 1957 
Auth. March 1, 1962, by 
Senate and House Public 
Works Committees 
Auth. by Chief of Engineers 
March 1, 1963 under Sec. 
107 of 1960 R&H Act 
January 21, 1927 
July 3, 1930 
PARA June 26, 1934 
August 26, 1937 
March 2, 1945 
Do. 
Do. 
July 3, 1958 
Chief of Engineers Report 
of July 22, 1960, Mod. 
12-foot channel 
Provided for the 28-foot channel and turning basin 
Provided for reducing the maximum width of turning basin 
from 1,000 to 800 feet, for shifting channel line in this 
vicinity 50 feet northwesterly and for including in 
authorized project small area dredged by Rayonier, Inc. 
Provided for 32-foot channel and turning basin 
FORT MYERS BEACH, FLA. (See Section 10 of Text) 
12 x 150 foot channel in San Carlos Bay, thence 11 x 125 feet 
in Matanzas Pass to upper shrimp terminals 
Extension of 11 x 125 foot channel easterly about 2,000 feet 
to and including a turning basin adjacent to natural deep 
water in Matanzas Pass 
INTERACOASTAL WATERWAY, CALOOSAHATCHEE 
RIVER TO ANCLOTE RIVER, FLA. (See Section 11 of Text) 
9 x 100 foot channel; deepening channel at Caseys Pass to 9 
feet; and construction of highway bridge at Venice 
Original route may be modified at no excess cost to United 
States 
Any route in Venice-Lemon Bay area may be used 
Use of alternate Route C-i in Venice-Lemon Bay area 
Local interests to bear costs of Venice Avenue highway bridge 
and any other necessary crossings over Route C-1 
Sunshine Skyway Channel to be improved and maintained to 
9 x 100 feet 
6 x 80 foot channel in Boca Ciega Bay 
INTRACOASTAL WATERWAY, JACKSONVILLE TO MIAMI, 
FLA. (See Section 12 of Text) 
Channel 8 x 75 feet from Jacksonville to Miami 
Channel width of 100 feet 
Operation and care of Palm Valley Bridge 
Turning basin at Jacksonville Beach 
Channel 12 x 125 feet 
Side channel and turning basin at Sebastian 
Turning basin at Vero Beach 
Maintenance of side channel at Daytona Beach 
Channel 10 x 125 feet from Ft. Pierce to Miami 
JACKSONVILLE HARBOR, FLA. (See Section 13 of Text) 
ST. JOHNS RIVER, FLA., OPPOSITE THE CITY OF 
JACKSONVILLE 
March 2, 1907 The 24-foot area from Hogan Creek to Florida East Coast 
Railroad bridge 
ST. JOHNS RIVER, FLA. 
Jetties at entrance (maintenance only) 
Extension of jetties, etc. (maintenance only) 
A.R. 1879, p. 767 
H. Ex. Doc. 346, 
53d Cong., 3d Sess., 
and A.R. 1895, p. 1586 
312 
HD 548/75/3 
HD 284/87/1 
HD 662/80/2 
HD 183/86/1 
HD 371/76/1 
Specified in Act 
Specified in Act 
Specified in Act 
HD 109/85/1 
HD 586/69/2 
SD 71/71/2 
Specified in Act 
HD 180/75/1 
HD 740/79/2 
HD 336/76/1 
HD 261/76/1 
HD 222/85/1 
HD 663/59/1 
June 14, 1880 
June 3, 1896

JACKSONVILLE, FLA., DISTRICT 
TABLE 9-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized 
June 25, 1910 
June 5, 1920 
July 3, 1930 
August 30, 1935 
March 2, 1945 
Do. 
Do. 
October 27, 1965 
August 2, 1882 
June 3, 1896 
March 3, 1905 
July 27, 1916 
August 26, 1937 
July 3, 1930 
PWA Program, 
September 6, 1933 
June 13, 1902 
March 2, 1907 
July 25, 1912 
March 4, 1913 
March 3, 1925 
July 3, 1930 
August 30, 1935 
August 26, 1937 
Main channel 30 by 300-600 feet; anchorage basin at Mayport; 
and training walls and revetments 
ST. JOHNS RIVER, FLA., JACKSONVILLE TO THE OCEAN 
Consolidation of above projects 
Widening bend at Dame Point to 900 feet 
Widening Drummond, Trout, and Six Mile (now Long Branch) 
Creeks Cuts to 400 feet; and Terminal Channel 30 by 400 feet 
Maintenance of existing channel widths; widening Terminal 
Channel to 590 feet; the 28-foot area between Laura St. and 
St. Elmo W. Acosta Bridge; channel along south side of 
Commodore Point; and basin at Naval Reserve Armory 
Main channel 34 feet deep via Terminal Channel 
Dame Point-Fulton Cutoff 34 by 500 feet 
Maintain existing entrance channel depths of 40 and 42 feet; 
deepen main ship channel to 38 feet to Mile 20 and widen 
channel near Mile 5 and near Mile 7 
MANATEE RIVER, FLA. (See Section 14 of Text) 
Channel 13 x 100 feet from Tampa Bay to McNeil Point 
Cutoff 6 x 100 feet into Terra Ceia Bay 
Channel 9 x 100 feet from McNeil Point to Rocky Bluff, thence 
4 x 75 feet to Rye 
Established upper project limits at Mitchellville bridge 
MELBOURNE HARBOR, FLA. (See Section 15 of Text) 
Channel 8 x 100 feet and a turning basin 
MIAMI HARBOR, FLA. (See Section 16 of Text) 
MIAMI RIVER 
The 15-foot channel in Miami River, 150 feet wide at the 
mouth 
The channel at the Dinner Key Airport 
MIAMI HARBOR 
An 18-foot channel in a landcut across the peninsula and 
construction of the north jetty 
Construction of the south jetty and increase of channel 
width to 100 feet 
Enlarging the channel to 20 foot depth and 300 foot width 
and extending the jetties 
Modification of local cooperation requirements imposed by 
the Act of July 25, 1912 
A channel 25 feet deep with present widths from the ocean 
to Biscayne Bay, thence 200 feet wide across the bay to 
but not including the municipal turning basin, and extension 
of both jetties 
A channel width of 300 feet across the bay and enlarging 
the municipal turning basin, with expenditures thereon 
limited to $200,000 
A depth of 30 feet from the ocean to and in the turning 
basin, with the existing authorized project widths, 
including the 300 foot width in the channel across the bay 
Extending the turning basin 200 feet to the southward 
HD 611/61/2 
Specified in Act 
HD 483/70/2 
S. Comm. print, 74th 
Cong., 1st Sess. 
HD 322/77/1 
SD 230/78/2 
SD 179/79/2 
HD 214/89/1 
A.R. 1882 
Specified in Act 
HD 117/58/2 
Specified in Act 
HD 390/74/2 
Specified in Act 
SD 95/72/1 and specified 
in Act 
HD 662/56/1 (A.R. 1900, 
p. 1987) 
Specified in Act 
HD 554/62/2 
Specified in Act 
HD 516/67/4 
R&H Comm. Doc. 15, 
71st Cong., 2d Sess. 
Sen. Comm. Print, 
73d Cong., 2d Sess. 
R&H Comm. Doc. 86, 
74th Cong., 2d Sess. 
313 
Documents

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 9-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized 
March 2, 1945 
Do. 
July 14, 1960 
August 13, 1968 
PARA June 26, 1934 
August 26, 1937 
March 2, 1945 
Do. 
Auth. by Chief of Engineers 
November 5, 1968, under Sec. 
107 of 1960 R&H Act 
September 19, 1890 
March 2, 1907 
June 25, 1910 
July 25, 1912 
July 27, 1916 
PARA June 26, 1934 
March 13, 1934 
December 10, 1934 
August 30, 1935 
The Virginia Key improvement 
For incorporation of the project for Miami River in that 
for Miami Harbor, the widening at the mouth of Miami River 
to existing project widths; the channels from the mouth 
of Miami River to the turning basin and to Government Cut; 
and the channel from Miami River to the harbor of refuge, 
provided that local interests contribute one-third of the 
cost 
Deletion of Virginia Key development and the Dinner Key 
approach channel; widening the existing ship channel by 
easing the ocean bend and increasing the width of the 300- 
foot-wide section to 400 feet, enlarging the existing 
turning basin 300 feet along both the south and northeasterly 
sides, and dredging a turning basin along the 
north side of Fisher Island about 39 acres in extent 
and 30 feet in depth 
Enlarging existing entrance channel to 38 x 500 feet, 
deepening existing 400-foot-wide channel across Biscayne 
Bay to 36 feet; deepening existing turning basins at 
Biscayne Blvd. terminal and Fisher Island to 36 feet 
OKEECHOBEE WATERWAY, FLA. (See Section 17 of Text) 
Operation and care of locks and dams provided for with 
funds from R&H appropriations 
New lock and weir structure in St. Lucie Canal 
Deepening to 8 feet from Ft. Myers to Jacksonville-Miami 
waterway near Stuart via channel across lake from 
Clewiston 
Channel to yacht basin at Ft. Myers and a basin at Stuart 
Enlarge existing 8 x 90 foot section of Okeechobee Waterway 
for about 5 miles upstream from Ft. Myers to 10 x 100 feet 
OKLAWAHA RIVER, FLA. (See Section 18 of Text) 
Clearing obstructions for channel 4 feet deep from mouth 
to Leesburg 
Channel 6 feet deep from mouth to head of Silver Springs Run 
Maintenance of levels in the lakes at head of river 
Acceptance of certain artificial waterways in lieu of 
portions of natural river bed 
Operation and care of lock and dam provided for with funds 
from appropriations for rivers and harbors 
PALM BEACH HARBOR, FLA. (See Section 19 of Text) 
Maintenance of improvement previously constructed by 
local interests 
Deepening the channels and turning basin, as constructed 
by local interests, to 20 feet 
Authorized the work previously approved by Public Works 
Administration, and widening the channels to existing 
project dimensions, enlarging the 700-foot-square turning 
basin eastward, removing the obstructive point on south 
side of the inlet, revetting the banks of the inlet, and 
restoring existing jetties 
SD 251/79/2 
HD 91/79/1 
SD 71/85/2 
SD 93/90/2 
Specified in Act 
R&H Comm. Doc. 28/75/1 
HD 696/76/3 
HD 736/79/2 
A.R. 1889, p. 1360 
HD 782/59/1 
Specified in Acts 
Specified in Act 
Specified in Act 
HD 185/73/2 
Recommended by Chief of 
Engineers to Public 
Works Administration 
October 17, 1934 
HD 185/73/2 and R&H 
Comm. Doc. 42/74/1 
314 
Documents

JACKSONVILLE, FLA., DISTRICT 
TABLE 9-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
March 2, 1945 
May 17, 1950 
July 14, 1960 
March 2, 1945 
October 27, 1965 
March 3, 1925 
August 30, 1935 
March 2, 1945 
March 3, 1899 
June 13, 1902 
March 3, 1905 
March 2, 1945 
November 7, 1966 
March 3, 1899 
March 3, 1905 
Deepening the channels and turning basin to 25 feet 
Extending the turning basin 550 feet southward over a 900 
foot width, with a flare to the east; provided that local 
interests may be reimbursed not to exceed $305,000 for 
work done by them on this modification subsequent to 
July 1, 1949 
An entrance channel 35 feet deep, 400 feet wide, and 0.8 
mile long, merging with an inner channel 33 feet deep, 
300 feet wide, and 0.3 mile long, thence flaring into a 
turning basin, 1,400 feet north-south by a minimum of 
1,200 feet east-west 
PITHLACHASCOTEE RIVER, FLA. (See Section 20 of Text) 
Channel 6 x 100 feet and basin 
PONCE DE LEON INLET, FLA. (See Section 21 of Text) 
Widening and deepening channels; jetties on north and south 
side of inlet; a weir in the north jetty and an impoundment 
basin inside the weir 
PONCE HARBOR, P.R. (See Section 22 of Text) 
Dredging 3 contiguous areas, aggregating 153 acres, to depths 
of 30, 18, and 9 feet, and construction of a sea wall, 
costs to be shared by U.S. and local interests 
Modified conditions of local cooperation to provide that 
U.S. undertake all dredging at Federal expense and return 
local funds previously contributed for dredging, all other 
portions of the improvement hereafter to be at the expense 
of local interests 
Eliminated previously authorized 9-foot dredging area, and 
provided for dredging 30-foot-depth area of 18 acres off 
the municipal pier and for construction of the breakwater 
off Punta Carenero 
REMOVING THE WATER HYACINTHS FROM NAVIGABLE 
WATERS IN THE STATE OF FLORIDA (See Section 23 
of Text) 
Construction and operation of a suitable vessel and use of 
log booms for removal of water hyacinths in the navigable 
waters of the State 
Extermination and removal of water hyacinths by any 
mechanical, chemical, or other means 
Prohibits use of any chemical process injurious to cattle 
ST. LUCIE INLET, FLA. (See Section 24 of Text) 
Channel 10 x 200 feet 
Modification to maintain existing channel 6 x 100 feet 
TAMPA HARBOR, FLA. (See Section 25 of Text) 
TAMPA BAY 
For a channel 27 feet deep from the Gulf of Mexico to 
Port Tampa, 500 feet wide across the bar and 300 feet 
wide in the bay 
For a channel depth of 26 feet with sufficient width from 
the Gulf of Mexico to Port Tampa 
HD) 530/78/2 
HD 704/80/2 
HD 283/86/1 (contains 
latest published map) 
HD 86/77/1 
HD 74/89/1 
HD 532/67/4 
R&H Comm. Doc 18/72/1 
HD 745/79/2 
A.R. 1899 
Specified in Act 
Specified in Act 
HD 391/77/1 
HD 508/89/2 
HD 52/55/3. (Also 
printed in A.R. 1899, 
p. 1640). Channel 
dimensions specified 
in Act. 
Specified in Act 
315

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 9-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
TAMPA AND HILLSBOROUGH.BAYS 
June 25, 1910 
August 8, 1917 
March 3, 1899 
September 22, 1922 
July 3, 1930 
August 30, 1935 
June 20, 1938 
Do. 
March 2, 1945 
Do. 
Do. 
May 17, 1950 
For a depth of 24 feet in Hillsborough Bay 
For a 27 foot depth from Gulf of Mexico up to and in the 
several channels of Hillsborough Bay, the widths to be 
500 feet on the bar, 300 feet in Tampa Bay, Ybor, and 
Garrison Channels, and 200 feet in Hillsborough Bay, 
Sparkman, and Seddon Channels, with turning basins at 
the mouth of Hillsborough River and at Ybor Estuary 
HILLSBOROUGH RIVER 
For a 12-foot channel to within 100 feet of the Lafayette 
St. highway bridge (maintenance only; new work completed 
under a previous project under the title Improving 
Hillsborough Bay, Fla. ) 
TAMPA HARBOR 
Consolidation of the above projects to form a single project 
for Tampa Harbor 
Increasing the depth of Egmont Channel to 29 feet and the 
width of Sparkman Channel to 300 feet 
For a depth of 32 feet and a width of 600 feet on Egmont Bar, 
a depth of 30 feet and a width of 400 feet in Mullet Key 
Cut, and a depth of 30 feet and a width of 300 feet in all 
other project channels in Tampa Harbor (except in Hillsborough 
River and in the channel leading to Alafia River); and for 
a turning basin 2,000 feet long and 500 feet in maximum 
width at the entrance to the Port Tampa terminals 
For widening the bend between Sparkman Channel and Cut D of 
Hillsborough Bay Channel by 250 feet; widening Ybor Channel 
to 400 feet and extending the turning basin at the west 
end of Garrison Channel (mouth of Hillsborough River) easterly 
for 300 feet 
For construction of a breakwater at Peter O. Knight Field, 
Davis Islands, its maintenance to be assumed by local 
interests 
For widening Sparkman Channel to 400 feet and Ybor Channel 
to 500 feet; widening the bend between Sparkman and 
Garrison Channels an additional 250 feet to extend the 
turning basin westerly; and widening the bend between 
Seddon and Garrison Channels by 150 feet (in lieu of 300 
feet previously authorized) to extend the turning basin 
easterly 
For a channel 9 feet deep and 100 feet wide in the 
Hillsborough River for about 2.4 miles above the upper 
end of the existing 12-foot channel, and for the removal 
of obstructions thence to the Florida Avenue Bridge 
For a channel 25 feet deep and 150 feet'wide from the 
Hillsborough Bay Channel to and including a turning basin 
in the Alafia River. (Revoked by Act of May 17, 1950) 
For deepening Egmont Channel to 36 feet; enlarging Mullet 
Key Cut, Tampa Bay Channel, Hillsborough Bay Channel, Port 
Tampa Channel and Port Tampa turning basin to present 
project dimensions; deepening Sparkman Channel and Ybor 
turning basin to 34 feet;a channel 30 feet deep and 200 
feet wide from Hillsborough Bay Channel to and including a 
turning basin in Alafia River, 700 feet wide and 1,200 
feet long (in lieu of the improvement previously authorized); 
and substantial widening at entrance, bends, and turns 
HD 634/61/2 
HD 634/61/1 
HD 545/55/2 and A.R. 
1898, pp. 1357-1360 
Specified in Act 
HD 100/70/1 
SD 22/72/1 
SD 164/75/3 
Sen. Comm. Print, 
76th Cong., 1st Sess. 
SD 183/78/2 
HD 119/77/1 
SD 16/77/1 
HD 258/81/1 
316

JACKSONVILLE, FLA., DISTRICT 
TABLE 9-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
September 3, 1954 
October 23, 1962 
BEACH EROSION CONTROL 
PROJECTS 
May 17, 1950 
July 3, 1958 
November 7, 1966 
October 23, 1962 
FLOOD CONTROL PROJECTS 
June 30, 1948 
September 3, 1954 
July 14, 1960 
October 23, 1962 
Do. 
Do. 
October 23, 1962 
Do. 
October 27, 1965 
Do. 
August 13, 1968 
Do. 
October 23, 1962 
Auth. by Chief of Engineers 
August 22, 1968, under Sec. 
205 of 1948 FC Act 
Extended removal of obstructions in Hillsborough River to City 
Water Works Dam. Maintenance of cleared channel to be 
assumed by local interests 
Channel and turning basin at Port Sutton 30 feet deep, 
Ybor Channel 34 x 400 feet 
PALM BEACH COUNTY FROM LAKE WORTH INLET 
TO SOUTH LAKE WORTH INLET, FLA. (See Section 
29 of Text) 
Federal participation in cost of local shore protection project 
Federal participation in cost of local sand-transfer plant 
and shore protection project 
PINELLAS COUNTY, FLA. (See Section 30 of Text) 
Federal participation in cost of a shore protection project 
VIRGINIA KEY AND KEY BISCAYNE, FLA. (See Section 
31 of Text) 
Federal participation in cost of local shore protection project 
and construction of four groins 
CENTRAL AND SOUTHERN FLORIDA (See Section 34 of Text) 
First phase of comprehensive plan for flood control and 
other purposes 
Modification and expansion of authorization to include 
entire comprehensive plan of improvement 
Canals, levees, and water-control and drainage structures in 
the Nicodemus Slough area, Glades County 
Flood protection on Boggy Creek, near Orlando 
Flood protection in the Cutler Drain area, near Miami 
Flood control and drainage works for South Dade County 
Project for Shingle Creek between Clear Lake and Lake 
Tohopekaliga for flood control and major drainage, 
including development of Reedy Creek Swamp 
Improvement of easterly section of West Palm Beach Canal 
for flood control and major drainage 
Primary works for flood control and major drainage in 
southwest Dade County 
Primary works for flood control and major drainage in 
Hendry County 
Gravity drainage in Martin County and distribution of 
available water supplies to portions of Martin and St. 
Lucie Counties 
Improvement of supply, distribution, and conservation of 
water resources in Central and Southern Florida, including 
Lake Okeechobee agricultural area, Everglades National 
Park, and other related areas 
FOUR RIVER BASINS, FLA. (See Section 35 of Text) 
Control of floods and improvement of drainage, and for water 
conservation through construction of necessary canals, 
levees, reservoirs, and control structures 
HOGTOWN CREEK, FLA. (See Section 36 of Text) 
Provides for a levee and a 100 c.f.s. pumping station for 
protection of the Clear Lake Area 
HD 567/81/2 
HD 529/87/2 
HD 772/80/2 
HD 342/85/2 
HD 519/89/2 
HD 561/87/2 
HD 643/80/2 (contains 
latest published map) 
HD 643/80/2 
SD 53/86/1 
SD 125/87/2 
SD 123/87/2 
SD 138/87/2 
SD 139/87/2 
SD 146/87/2 
SD 20/89/1 
HD 102/88/1 
SD 101/90/2 
HD 369/90/2 
HD 585/87/2 
317 
451-584 0-72-21

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
CANAVERAL HARBOR, FLA.: 
DATA RELATIVE TO LOCK 
TABLE 9-C (See Section 3 of text) 
Distance to nearest town 9.9 miles via 12-foot barge 
canal and Intracoastal 
Waterway 
Name of nearest town Cocoa, Fla. 
Distance from Intracoastal Waterway 6.5 miles. 
Lock Dimensions 90' wide; 600' long1 
Lift Varies with tide 
Depth on sills (mlw, ocean) 14 feet 
Character of foundation Piles in sand 
Year completed and opened to navigation 1965 
Contract cost $2,966,539 
1. 56 x 400 feet authorized. At request of NASA lock was 
constructed 90' wide with NASA bearing additional cost 
($700,000). Length increased to 600' to be compatible 
with increased width. Operation and maintenance of lock 
is a Federal responsibility. 
CROSS-FLORIDA BARGE CANAL: 
LOCKS AND DAMS 
TABLE 9-D (See Section 7 of text) 
R.N. 
Henry H. Buckman Eureka Lock Bert Dosh Dunnellon Inglis Lock 
Lock & Dam Lock Lock and Dam 
Nearest town Palatka, Sparr, Ocala, Dunnellon, Inglis, 
(miles) 11.2 15.8 8.9 2.5 3.2 
Miles from Atlantic 
Intracoastal 
Waterway 90.4 111.4 127.7 156.5 168.6 
Lock dimensions 
(ft.) 84x600 84x600 84x600 84x600 84x600 
Normal lift (ft.) 20 20 0-152 12-272 28 
Depth over sills 
at normal pool 
levels: 
Upper (ft.) 14 17 16-312 16-312 18 
Lower (ft.) 15 14 16 18 15 
Character of 
foundation Piles in sand Piles in sand Piles in sand Rock Rock 
Kind of dam Movable Movable None None Movable 
Type const. Earth3 Earth 3 - - Earth 3 
Percent complete 99 98 0 0 100 
Estimated contract 
cost $6,024,000 $8,230,000 $7,430,000 $9,500,000 $7,800,000 
1. Clear width and greatest available length. 
2. Pool level varies with natural ground water profile from minimum 
elevation 40 to maximum elevation 55. 
3. With concrete spillway and movable gates. 
318

JACKSONVILLE, FLA., DISTRICT 
SPRAYING OPERATIONS 
TABLE 9-E (See Section 23 of Text) 
Project Locality Acres Sprayed Costs 
Removing the Water Hyacinth St. Johns River and tributaries 12,016 $133,882 
from Navigable Waters in the Okeechobee Waterway and tributaries 9,374 53,596 
State of Florida 
Acquisition, Grasshopper Airboats w/engines - 25,349 
Acquisition Welding Torch 72 
Supervision and Administration - 32,592 
Total 21,390 $245,491 
NAVIGATION PROJECTS ON WHICH RECONNAISSANCE AND 
CONDITION SURVEYS ONLY WERE CONDUCTED DURING FISCAL YEAR 
TABLE 9-F (See Section 26 of text) 
Date Cost Incurred 
Survey During 
Project Conducted Fiscal Year1 
Atlantic Intracoastal Waterway between 
Norfolk, Va., & St. Johns River, Fla. 
(Jacksonville District) Sep.-Oct. 1969 $6,860 
Fort Pierce Harbor, Fla. Jan. 1970 761 
Johns Pass, Fla. Aug.-Sep. 1969 5,170 
Key West Harbor, Fla. Nov. 1969 4,598 
Largo Sound, Fla. Oct.-Nov. 1969 5,376 
New Pass, Sarasota, Fla. Feb. 1970 5,552 
Port Everglades Harbor, Fla. Mar. 1970 410 
Rice Creek, Fla. Jan. 1970 2,531 
St. Petersburg Harbor, Fla. June 1970 1,056 
Withlacoochee River, Fla. Mar. 1970 8,008 
1. Costs of surveys included with maintenance costs under 
Section "Other Authorized Navigation Projects." 
TABLE 9-H NAVIGATION WORK UNDER SPECIAL AUTHORIZATION 1 
(See Section 28 of text) 
Study Identification Fiscal Year Costs 
Reconnaissance Report: 
Matlacha Pass, Fla. $ 2,288 
Detailed Project Reports: 
Bayport, Fla. 14,6822 
Boca de Cangrejos, P.R. 6,305 
Cedar Island, Fla. 730 
Charlotte Harbor (Pt. Charlotte), Fla. 2,615 
Intracoastal Waterway, Miami to Turkey Point, Fla. 1,239 
Longboat Pass, Fla. 15,486 
Stump Pass, Fla. 21,400 
1. Navigation activities pursuant to Section 107, Public Law 
86-645 (preauthorization) 
2. Cost included in new work costs on applicable project. 
319

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 9-G OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 27 of Text) 
For last Cost to June 30, 1970 
Full report Operation 
See Annual and 
Project Report for Construction Maintenance 
Anclote River, Fla.1 1959 267,4272 91,420 
Aquatic Plant Control, Fla.1 
(R&H Acts of 1958 &1962) 1968 2,619,7003 
Arecibo Harbor, P.R. 1969 1,128,0754 456,106 s 
Atlantic Gulf Ship Canal, Fla. 1939 5,099,153 - 
Atlantic Intracoastal Waterway between 
Norfolk, Va., and St. Johns River, Fla., 
(Jacksonville District) 1969 361,2256 996,958 
Bakers Haulover Inlet, Fla. 1965 243,2357 419 
Cedar Keys Harbor, Fla.1,8 1966 168,5699 30,000 
Christiansted Harbor, St. Croix, V.1. 1 0 1964 303,31711 
Courtenay Channel, Fla.1 1940 22,846 
Crystal River, Fla. l 1941 25,000 23,027 
Everglades Harbor, Fla.1 1964 221,50912 6,820 
Fajardo Harbor, P.R.8 1945 - - 
Fort Pierce Harbor, Fla. 1969 353,78413 1,107,806 
Guayanes Harbor, P.R.8 1945 - - 
Gulf Intracoastal Waterway, St. Marks 
to Tampa Bay, Fla. 1969 _ 14 
Homosassa River, Fla.l 1937 3,99915 697 
Horseshoe Cove, Fla.1 1967 347,52116 90,079 
Hudson River, Fla.1 7 1950 - - 
Intracoastal Waterway, Miami to Key 
West, Fla.8 1963 243,079 2,996 
Johns Pass, Fla. 1969 80,598 7,410 
Key West Harbor, Fla.1 1969 1,548,89219 346,709 
Kissimmee River, Fla.1 1931 23,479 25,202 
Lake Crescent and Dunns Creek, Fla.8 1931 10,276 8,166 
Largo Sound Channel, Fla.1 , ' 20 1966 117,44321 5,376 
Little Manatee River, Fla.8 1949 11,90322 
Mayaguez Harbor, P.R.1 1969 168,187 258,465 
New Pass, Sarasota, Fla.1 '2 3 1964 45,81124 10,325 
New River, Fla.1 1956 36,518 
Orange River, Fla.1 1962 2,000 18,057 
Ozona, Fla., channel and turning basins 1963 105,5272 
Palm Beach, Fla., side channel and basin8 1946 - - 
Pass-A-Grille Pass, Fla. 1' 2 5 1966 41,29726 2,217 
Port Everglades Harbor, Fla.1 1965 6,655,77327 653,947 
Rice Creek, Fla. 1 1957 85,20828 3,137 
St. Augustine Harbor, Fla.1 1958 1,476,43429 182,604 
St. Johns River, Jacksonville to 
Lake Harney, Fla. 1963 1,171,24330 603,28331 
St. Petersburg Harbor, Fla. 1966 255,60832 81,98033 
St. Thomas Harbor, V1.8 1949 1,989 - 
San Juan Harbor, P.R. 1969 13,774,96934 2,700,63635 
Snagging and clearing under authority of 
Section 3 of River and Harbor Act of 
March 2, 1945 1965 39,288 197,23436 
320

TABLE 9-G (Continued) 
JACKSONVILLE, FLA., DISTRICT 
OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 27 of Text) 
For last Cost to June 30, 1970 
Full report Operation 
See Annual and 
Project Report for Construction Maintenance 
Steinhatchee River, Fla. 1940 135,053 5,783 
Suwannee River, Fla. 1963 76,41837 102,168 
Withlacoochee River, Fla. 1969 614,91238 301,061 
1. Complete. 
2. Excludes $5,000 preauthorization study cost. 
3. Excludes $130,000 for preauthorization studies and 
$918,205 contributed funds. 
4. In addition $288,000 was expended from contributed 
funds. 
5. Cost adjustment -$63. 
6. Includes $97,566 for previous project. 
7. Excludes $19,000 for preauthorization studies and 
$243,235 contributed funds. 
8. Inactive. 
9. Includes $82,500 expended under previous project but 
excludes $22,313 for preauthorization studies and $1,473 
contributed funds. 
10. Project as modified by Chief of Engineers in report of 
June 30, 1961, is complete. Previously authorized depth of 25 
feet in inactive status. 
11. Excludes $20,000 for preauthorization studies. 
12. Excludes $26,712 for preauthorization studies and 
$36,000 contributed funds. 
13. In addition, $16,302 expended from contributed funds. 
14. Cost of preauthorization studies was $346,570. 
15. In addition, $1,000 expended from contributed funds. 
16. Excludes $9,929 for preauthorization studies. 
17. Deferred for restudy. 
18. Project authorized December 2, 1964, by Chief of 
Engineers under Section 107 of 1960 R&H Act and by Section 
110 of the 1966 R&H Act. Cost of new work excludes $15,251 
for preauthorization studies and $53,732 contributed funds. 
19. Includes $27,500 expended for new work under previous 
project, $345,887 for removal of Middle Ground and $33,658 
for new work in Main Ship Channel, of which $2,274 was for 
removal of coral heads, under authority of the special act of May 
28, 1908. Excludes $18,000 for preauthorization and $35,371 
contributed funds. 
20. Authorized April 20, 1964, by Chief of Engineers under 
Section 107 of 1960 R&H Act. 
21. Includes $25,008 for detailed project report but excludes 
$86,716 expended from contributed funds. 
22. Expended on restudy. 
23. Authorized August 28, 1963, by Chief of Engineers under 
Section 107 of R&H Act of 1960. 
24. Excludes $45,811 expended from contributed funds. 
25. Authorized November 19, 1964, by Chief of Engineers 
under Section 107 of R&H Act of 1960. 
26. Excludes $17,406 for preauthorization studies and 
$41,297 contributed funds. 
27. Excludes $28,148 for preauthorization studies and 
$323,456 contributed funds. 
28. Excludes $8,000 for preauthorization studies and 
$93,000 contributed funds. 
29. Includes $71,303 for new work on previous project. 
Excludes $59,000 preauthorization studies and $137,500 
expended from contributed funds. North jetty is in deferred 
status. 
30. Beresford cutoff and completion of cutoffs and easing of 
bends in Putnam, Lake, and Volusia Counties in inactive status. 
Includes $29,566 for new work under previous project. 
31. Includes $25,838 under previous project. 
32. Includes $32,689 under previous project; excludes $6,000 
for preauthorization studies. 
33. Includes $20,532 under previous project. 
34. Includes $747,684 for previous project. Excludes 
$14,676 for preauthorization studies and $100,000 expended 
from contributed funds. 
35. Includes $44,730 under previous project. 
36. In addition $1,672 expended from contributed funds. 
37. Includes $10,154 expended under previous project. 
38. Includes $30,000 expended under previous project. 
321

TABLE 9-I 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
(See Section 32 of Text) 
Cost to June 30, 1970 
For last 
Full report Operation 
See Annual and 
Project Report for Construction Maintenance 
Brevard County, Fla. 1969 -1 
Broward County, Fla., Beach 
Erosion Control and Hillsboro 
Inlet, Fla., Navigation 
Project 1966 - 
Cape Florida State Park 1969 34,8623 
Dade County, Fla. 1969 - 4 
Duval County, Fla. 1966 - 5 
Fort Pierce, Fla. 1969 6 
Key West, Fla. 1963 96,3407 3,794 
Mullet Key, Fla. 1969 125,0008 - 
Palm Beach County, Fla., from 
Martin County Line to Lake 
Worth Inlet and from South 
Lake Worth Inlet to Broward 
County Line 1965 - 
San Juan, Puerto Rico 1965 10 
1. Federal cost of preauthorization studies was $109,612. 
2. Preauthorization studies amounted to $29,620 Federal 
cost and excludes $24,880 contributed cost. 
3. Includes $2,462 cost of reconnaissance and detailed 
project reports, but excludes $13,818 contributed funds. 
4. Federal cost of preauthorization studies was $63,069. 
5. Federal cost of preauthorization studies was $54,171. 
6. Federal cost of preauthorization studies was $16,250. 
7. Excludes $10,800 Federal cost of preauthorization 
studies and $192,168 contributed funds. 
8. Excludes $33,688 for preauthorization studies and 
$7 2,878 contributed funds. 
9. Preauthorization studies amounted to $37,161 Federal 
cost and excludes $26,150 contributed cost. 
10. Preauthorization studies amounted to $23,532 Federal 
cost and excludes $22,400 contributed cost. 
BEACH EROSION CONTROL ACTIVITIES 
PURSUANT TO SECTION 103, PUBLIC LAW 87-874 
(PREAUTHORIZATION) 
TABLE 9-J (See Section 33 of text) 
Study Information Fiscal Year Costs 
Reconnaissance Reports: 
Cinnamon Bay, St. Johns Island, V.I. $ 245 
DeSoto National Memorial Park, Fla. 2,600 
El Tuque Beach, P.R. 3,581 
Detailed Project Report: 
El Tuque Beach, P.R. 10,622 
Siesta Beach & Vicinity, Sarasota County, Fla. 995 
322

CENTRAL AND SOUTHERN FLORIDA: 
PRINCIPAL FEATURES OF HURRICANE GATES 
TABLE 9-K (See Section 34 of text) 
Nearest Town Depth Character 
Gate1 Over of Year 
No. Distance Sills Founda- Com- Actual 
Name (miles) (ft.) tion pleted Cost 
2. Clewiston, Fla. 0.5 10 Pile 1935 $309,748 
3. Lake Harbor, Fla. 0.5 10 Rock 1935 316,938 
4. Belle Glade, Fla. 4.0 10 Rock 1935 350,025 
5. Canal Point, Fla. 0.0 10 Rock .1935 262,465 
6. Okeechobee, Fla. 0.5 7 Pile 1936 373,273 
1. All are 50 feet wide with available length unlimited. They 
are constructed of concrete with steel sector gates and have 
no lift. Gate No. 6 has an auxiliary culvert spillway with 
automatic control. Moore Haven Lock serves as Hurricane 
Gate Structure 1. 
CENTRAL AND SOUTHERN FLORIDA 
LOCAL COOPERATION 
TABLE 9-L (See Section 34 of text) 
% Cash 
Flood Control Act Work Authorized Contribution1 
June 30, 1948 First phase of comprehensive plan 15.0 
Sept. 3, 1954 Second phase of comprehensive plan 20.0 
July 14, 1960 Nicodemus Slough area 31.5 
Oct. 23, 1962 West Palm Beach Canal 12.8 
Oct. 23, 1962 Boggy Creek Basin 29.7 
Oct. 23, 1962 Shingle Creek Basin 25.9 
Oct. 23, 1962 South Dade County area 19.2 
Oct. 23, 1962 Reedy Creek Swamp 50.0 
Oct. 27, 1965 Southwest Dade County 46.0 
Oct. 27, 1965 Hendry County area 19.5 
Aug. 13, 1968 Martin County 
Flood Control Features 34.0 
Irrigation Features 49.0 
Recreation Features 42.0 
Aug. 13, 1968 Water Resources 20.0 
Water Resources - Recreation Facilities 50.0 
1. Computed on total contract cost and supervision and 
administration except for Reedy Creek Swamp which is 
computed on all costs, including engineering and design 
and land. 
323

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
CENTRAL AND SOUTHERN FLORIDA: 
OPERATIONS AND RESULTS DURING FISCAL YEAR 
TABLE 9-M (See Section 34 of text) 
Work Performed Cost 
New Work (contract): 
Construction of: 
Channels and canals $3,776,036 
Levees 1,026,050 
Pumping plants 933,034 
Floodway control and diversion structures 1,053,284 
Engineering and design 1,802,030 
Supervision and administration 697,982 
Total applied cost 9,288,416 
Undistributed cost 6,876 
9,295,292 
Maintenance: 
Patrol, inspection, and maintenance of lake levee slopes 174,432 
Periodic and miscellaneous surveys, inspections, repairs, 
and operations 108,360 
Operation and care of facilities and grounds 125,356 
Clean out landside toe ditches and berms on Hoover Dike 
(Lake Okeechobee Levees) 6,037 
Repair fence, L-48, L-49, and L-50 6,323 
Repair erosion on berm levees LD-1, LD-2, & LD-3 14,655 
Construct fence along right-of-way of C-43, Section 4 261 
Installation of sewage treatment plant to replace septic 
tanks at S-79 lock 1,710 
Miscellaneous maintenance and repairs to facilities 69,877 
Stabilize levee crown road L-48 30,497 
Clean silt, hyacinths & other growths and debris from 
landside entrance channel to all culverts, approach 
channels and HGS & floodway channels 7,010 
Reimbursement to local sponsor for pumping water to 
supply Everglades National Park 21,000 
Reimbursement to U.S. Geological Survey for operation & 
maintenance for 2 gaging stations 4,085 
Reimbursement to U.S. Weather Bureau for furnishing 
reports on rainfall stations 6,127 
Dewater and repair W. P. Franklin lock 30,981 
Engineering and design 2,915 
Supervision and administration 116,973 
TOTAL $726,599 
324

CENTRAL AND SOUTHERN FLORIDA 
CONSTRUCTION COMPLETED UNDER EXISTING PROJECT 
TABLE 9-N (See Section 34 of text) 
Date transferred to 
Flood Control District 
Construction for operation and 
Feature period maintenance 
Channels and canals: 
C-29 Sept. 1967-Oct. 1969 May 1970 
C-30 Sept. 1967-Oct. 1969 May 1970 
C-32 Sept. 1967-Oct. 1969 May 1970 
C-43 Shoal Removal May 1968-July 1969 Not transferred 
C-43 Sec. 4 Spoil Bank May 1968-Jan. 1970 Not transferred 
Treatment & Bank 
Protection 
C-54 Sec. 2 July 1966-Feb. 1970 Not transferred 
C-60 July 1968-March 1970 Not transferred 
C-113 Rem. July 1968-April 1970 May 1970 
C-123 June 1967-Dec. 1969 Not transferred 
Levees: 
L-31E Sec. 1 Rem. July 1968-April 1970 Not transferred 
L-31W July 1968-April 1970 Not transferred 
L73 Sec. 1 Sept. 1967-Sept. 1969 May 1970 
Structures: 
S-57 Sept. 1967-Oct. 1969 May 1970 
S-58 Sept. 1967-Oct. 1969 May 1970 
S-62 Sept. 1967-Oct. 1969 May 1970 
S-83 June 1967-July 1969 Not transferred 
S-96 July 1966-Feb. 1970 Not transferred 
S-133 June 1967-July 1969 August 1969 
S-133 Machinery June 1966-Feb. 1970 Not transferred 
S-135 June 1967-July 1969 March 1970 
S-135 Machinery June 1966-Feb. 1970 Not transferred 
S-140 May 1966-Jan. 1970 May 1970 
S-140 Machinery Oct. 1965-Dec. 1969 Not transferred 
S-157 July 1966-Feb. 1970 Not transferred 
S-164 Sept. 1967-Sept. 1969 May 1970 
S-174 July 1968-April 1970 Not transferred 
S-175 July 1968-April 1970 Not transferred 
325

TABLE 9-0 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
CENTRAL AND SOUTHERN FLORIDA 
STATUS OF WORKS UNDER CONTRACT AT END OF FISCAL YEAR 
(See Section 34 of text) 
Construction Approx. % 
Feature Started Complete 
Channels and canals: 
C-38 Sec. 4, 5, 6 June 1967 78 
C-43 Sec. 5A Sept. 1967 91 
C-43 Sec. 5B Aug. 1969 54 
C-57 May 1968 80 
C-57 Rem. June 1970 1 
C-58 Sec. 1 June 1970 1 
C-59 Aug. 1970 51 
C-108 Not started - 
C-109 Not started -- 
C-110 Not started - 
Levees: 
L-62 Not started - 
G63N Not started - 
-63S Not started - 
164 (Part) April 1968 93 
1,64 Rem. Not started 
L-65 April 1968 93 
S-65B West Tieback Levee Rem. June 1967 78 
L-73 Sec. 2A May 1968 80 
1,73 Sec. 2A Rem. June 1970 1 
L-73 Sec. 2B June 1970 1 
St. Lucie Canal Tieback Levee April 1968 93 
Structures: 
S-4 Machinery May 1969 83 
S-18 Not started - 
S-19 Not started - 
S-153 April 1968 93 
S-161 June 1970 1 
S-163 June 1970 1 
S-191 Aug. 1969 51 
S-192 Not started - 
S-193 Not started 
S-199 Not started - 
S-221 May 1968 80 
TABLE 9-P. FOUR RIVER BASINS, FLORIDA: 
MOSS BLUFF LOCK 
(See Section 35 of text) 
Nearest town 20 miles 
Name of nearest town Ocala, Fla. 
Distance above mouth of River 65.5 miles 
Lock dimensions 30 x 125 feet 
Normal lift 18.0 feet 
Elevation of normal pool surface 58 feet 
Depth of sills 12 feet 
Character of foundation Piles in sand 
Kind of dam None 
Type of construction Reinforced concrete 
Percent complete 100 
Cost (including dam and spillway) $2,032,000 
326

TABLE 9-Q FOUR RIVER BASIN, FLORIDA: 
CONDITION AT END OF FISCAL YEAR 
(See Section 35 of text) 
Date Transferred 
to Southwest Florida 
Construction Water Management District 
Feature Period for Operation and Maintenance 
Bridges: 
B-194 July 1968 - Mar. 1970 Not transferred 
Channels and Canals: 
C-135 May 1967 - Dec. 1968 Dec. 1968 
C-135, Sec. lA July 1966- Aug. 1967 Oct. 1967 
C-331 July 1967 - Sept. 1968 Nov. 1968 
C-531 April 1966 -Jan. 1969 Not transferred 
Structures: 
S-160 May 1967 -Dec. 1968 Dec. 1968 
S-353 July 1967 - Sept. 1968 Nov. 1968 
Moss Bluff Lock and 
Spillway April 1967 - Nov. 1969 Not transferred 
TABLE 9-R OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 38 of Text) 
Cost to June 30, 1970 
For last 
Full report Operation 
See Annual and 
Project Report for Construction Maintenance 
Biscayne Bay, Fla., Hurricane 
Protection 1966 _ 2 
Hillsborough Bay, Fla. 1966 - 
Phillippi Creek Basin, Fla. 1966 - 4 
1. Inactive. 
2. Federal cost of preauthorization studies was $116,386. 
3. Federal cost of preauthorization studies was $12,944. 
4. Federal cost of preauthorization studies was $42,823. 
TABLE 9-S FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 1 
(See Section 39 of text) 
Study Identification Fiscal Year Costs 
Detailed Project Reports 
Alligator Creek, Fla. $ 3,345 
Cedar River, Fla. 2,500 
Fajardo River, P.R. 20,446 
Gurabo River, P.R. 3,848 
Orocovis River, P.R. 3,262 
1. Flood control activities pursuant to Section 205, Public 
Law 685, 84th Congress, as amended (preauthorization). 
327

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 9-T FLOOD PLAIN MANAGEMENT SERVICES COMPLETED TO DATE 
(See Section 41 of text) 
Requesting Date Federal 
Location Agency Completed Cost 
Bayamon River, Puerto Rico Dept. of Public Works, Apr 1965 $12,863 
Commonwealth of P.R. 
Broward County, Florida Broward County Board Mar 1965 29,968 
of County Commissioners 
Caguas (Caguitas River), P.R. Dept. of Public Works, May 1968 23,708 
Commonwealth of P.R. 
Charlotte and North Lee Charlotte & Lee County July 1968 40,615 
Counties, Florida Boards of County Commissioners 
Guayanilla River, Puerto Dept. of Public Works, Jan 1968 13,967 
Rico Commonwealth of P.R. 
Humacao River, Puerto Rico Dept. of Public Works, Aug 1966 9,606 
Commonwealth of P.R. 
La Plata River, Puerto Rico Dept. of Public Works, Jun 1966 21,961 
Commonwealth of P.R. 
Little Wekiva River, Fla. Dept. of Natural Apr 1970 24,477 
Orange County, Florida Resources 
Lower St. Johns River, Fla. Duval County Board of May 1968 31,259 
County Commissioners 
Manati River, Puerto Rico Dept. of Public Works, Mar 1967 20,654 
Commonwealth of P.R. 
Palm Beach County Coastal Palm Beach County Nov 1969 22,893 
Areas, Fla. Planning Board 
1. Sponsor: Florida Dept. of Natural Resources, Div. of 
Water Resources. 
328

CENTRAL AND SOUTHERN FLORIDA 
PRINCIPAL FEATURES OF LOCKS AND DAMS 
(See Section 34 of Text) 
Miles Lock Elevation of Character Kind Type 
Nearest From Lock Normal Depth of of of ofercent Contract 
Town nearest (ft.)ion lift (ft.) surface (ft.) sills (ft.) foundation Dam Construction Complete Cost 
Town 
W.P. Franklin At Olga 
Lock and Dam1 
S-65 Lock Frostproof 
S-65A Lock Avon Park 
S-65B Lock Sebring 
S-65C Lock Sebring 
S-65D Lock Okeechobee 
S-65E Lock Okeechobee 
Moore Haven Moore Haven 
Lock (HGS-1 
Mod.) 
S-310 Clewiston 
(HGS-2 Mod.) 
S-193 Okeechobee 
(HGS-6 Mod.) 
S-308B Pahokee 
Lock on Flamingo 
Buttonwood 
Canal 
0 
23 
26 
20 
25 
14 
10
0.5 
0.5 
0.5 
11
2 
56 X 400 
30 X 90 
30 X90 
30 X 90 
30 X 90 
30 X 90 
30 X 90 
50 X 250 
50 X 60 
50 X 60 
56 X 400 
20 X 60 
2.5 
4.2 
6.3 
6.0 
7.2 
5.8 
4.6 
9.4 
5.0 
7.5 
4.0 
2.0 
3.0 14 Piles in Movable Reinforced 
clay concrete 
50.5 6 Earth, founda- None Reinforced 
tion, sand concrete 
rigid frame 
46.3 6 Earth, founda- None Reinforced 
tion, sand concrete 
rigid frame 
40.0 6 Earth founda- None Reinforced 
tion, sand concrete 
rigid frame 
34.0 6 Earth founda- None Reinforced 
tion, sand concrete 
rigid frame 
26.8 6 Earth founda- None Reinforced 
tion, sand concrete 
rigid frame 
21.0 6 Earth founda- None Reinforced 
tion, sand concrete 
20.5 11 Piles in None Steel sheet 
sand pile lockwalls 
20.5 12.9 Slab on sand None Reinforced 
concrete 
20.5 7.5 Piles in sand None Reinforced 
and slab on concrete 
sand 
20.5 18 Slab on sand Fixed Reinforced 
concrete 
2.0 6 Slab on sand None Steel sheet 
pile lockwalls 
1. Operation and care of W.P. Franklin Lock and Dam 
(S-79) is a Federal responsibility. 
2. Estimated. 
TABLE 9-U. 
100 
100 
100 
100 
100 
100 
100
0
0
0
0
0 
$3,803,655 
$1,194,132 
$1,492,495 
$ 921,819 
$1,092,424 
$1,130,835 
$1,269,282 
$ 99,0002 
$ 974,0002 
$2,397,0002 
$2,920,0002 
$ 212,0002

MOBILE, ALA., DISTRICT* 
This district comprises a small portion of southeastern 
Tennessee, western Georgia, western Florida, 
all of Alabama south of Tennessee River Basin, eastern 
Mississippi, and a small portion of southeastern 
Louisiana embraced in drainage basins tributary to the 
Gulf of Mexico, west of Aucilla River Basin, to and 
including Pearl River Basin. It includes section of Gulf 
Intracoastal Waterway from St. Marks, Fla., to Lake 
Borgne Light No. 41, La. 
IMPROVEMENTS 
Navigation Page 
1. Apalachicola Bay, Fla. ......................... 332 
2. Aquatic plant control (R&H Act of 
1965) ............................................ .3.3.2.. 
3. Bayou Coden, Ala. ................................ 333 
4. Bayou La Batre, Ala. ........................... 333 
5. Biloxi Harbor, Miss. ............................... 334 
6. Black Warrior and Tombigee Rivers, 
A la. ................................................ ..3.34. 
7. Blackwater River, Fla. .................... 336 
8. Cadet Bayou, Miss.............. .... 336 
9. Dauphin Island Bay, Ala. ............3.3.6........ 
10. Dog and Fowl Rivers, Ala. ................. 337 
11. East Pass Channel from Gulf of 
Mexico into Choctawhatchee Bay, 
F la .......................................................... 337 
12. East Pearl River, Miss...........................337 
13. Escambia and Conecuh Rivers, Fla. 
and Ala. .......................................... 338 
14. Fly Creek, Fairhope, Ala. ............3.3.8......... 
15. Grand Lagoon, Panama City, Fla........ 339 
16. Gulf Intracoastal Waterway between 
Apalachee Bay, Fla., and Mexican 
border (Mobile District) ................... 339 
17. Gulfport Harbor, Miss ............................ 340 
18. LaGrange Bayou, Fla ........................ 340 
19. Mobile Harbor, Ala ........................... 341 
20. Panama City Harbor, Fla. .................. 341 
21. Pascagoula Harbor, Miss .... ............... 342 
22. Pass Christian Harbor, Miss. .......... 342 
23. Pearl River, Miss., and La. ................ 343 
24. Pensacola Harbor, Fla. ......................... 343 
25. Perdido Pass, Ala. ................................. 344 
26. Port St. Joe Harbor, Fla. .................... 344 
27. Removing Water Hyacinth, Mobile 
D istrict ............................... ............... 344 
28. Waterway connecting Tombigbee and 
Tennessee Rivers, Ala., and Miss. ....3.4 5 
Navigation (cont.) Page 
29. Wolf and Jordan Rivers, Miss. ........... 345 
30. Reconnaissance and condition surveys .. 346 
31. Other authorized navigation projects .... 346 
32. Navigation work under special 
authorization ..................................... 346 
Beach Erosion Control 
33. Authorized beach erosion control 
project ........................................ 346 
Flood Control 
34. Baldwin and Hannon sloughs, 
Montgomery, Ala. ...................... . 346 
35. Jackson and East Jackson, Miss. ........... 346 
36. Lake Douglas, Decatur County, Ga. .... 347 
37. Okatibbee Reservoir, Miss. .................. 347 
38. Tombigbee River tributaries, Miss., and 
Ala. ........................... ....3.47.. 
39. Inspection of completed flood control 
projects .......... ...................... . 348 
40. Other authorized flood control projects 348 
41. Flood control work under special 
authorization ................................... 348 
Multiple-Purpose Projects Including Power 
42 Alabama-Coosa Rivers, Ala� and Ga. 348 
42 A. Allatoona Reservoir, Coosa River 
Basin, Ga . .................... .... 349 
42 B. Carters Dam and Reservoir, Ga.......... 350 
42 C. Claiborne lock and dam, Ala. ............ 350 
42 D. Jones Bluff lock and dam, Ala. .......... 350 
42 E. Millers Ferry lock and dam, Ala. ....... 350 
43. Apalachicola, Chattahoochee, and Flint 
Rivers, Ala., Ga., and Fla. .............. 351 
43 A. Buford Dam and Reservoir, Ga. ........ 352 
43 B. Columbia lock and dam, Ala., and Ga. 352 
43 C. Jim Woodruff lock and dam, Ga., and 
Fla........................................................... 353 
43 D. Lazer Creek Reservoir, Ga. .................... 354 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in textand also 
appear at the end of this chapter. 
331

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Multiple-Purpose Projects Including Power (cont.) Page 
43 E. Lower Auchumpkee Reservoir, Ga. ....... 354 
43 F. Spewrell Bluff Dam and Reservoir, Ga. 354 
43 G. Walter F. George lock and dam, Ala., 
and G a .............. .............................. 355 
43 H. West Point Dam and Reservoir, 
Chattahoochee River Basin, Ga., and 
Ala. .......................... . ... ........ 355 
Multiple-Purpose Projects Including Power (cont.) Page 
44. Scheduling flood control reservoir 
operations .................... ..................... 356 
45. 
46. 
47. 
General Investigations 
Surveys ..................................................... 356 
Collection and study of basic data ....... 356 
Research and development ............ 356 
NAVIGATION 
1. APALACHICOLA BAY, FLA. 
Location. The project is on the coast of northwest 
Florida 160 miles east of Pensacola Harbor. (See Coast 
and Geodetic Survey Chart 1262.) 
Previous projects. For details, see page 1833, Annual 
Report for 1915, and page 689, Annual Report for 
1938. 
Existing project. The authorized project provides for: 
(a) A channel 10 feet deep and 100 feet wide from the 
10-foot depth in Apalachicola Bay, across St. George 
Island, to within 300 feet of the gulf shore, thence 
increasing uniformly in width to 200 feet at the shore 
and continuing with that width to the 10-foot depth in 
the Gulf of Mexico, with twin jetties extending from the 
dune line to the outer end of the channel; (b) an inner 
bar channel, 10 feet deep and 100 feet wide, in 
Apalachicola Bay; (c) a boat basin 200 by 880 feet and 
9 feet deep at Apalachicola, Fla., with a connecting 
channel 9 feet deep and 80 feet wide through Scipio 
Creek to Apalachicola River; (d) a channel known as 
Link Channel, 10 feet deep and 150 feet wide, in 
Apalachicola Bay; (e) a channel generally parallel to 
the shore at Eastpoint, Fla., 6 feet deep, 100 feet wide, 
and about 6,000 feet long, with a connecting channel 6 
feet deep and 100 feet wide to water at the same depth 
in St. George Sound; (f) a channel 9 feet deep and 100 
feet wide through Bulkhead Shoals, connecting Apalachicola 
Bay with St. George Sound; and (g) a 6- 
foot by 100-foot channel about 1 mile long, generally 
parallel to the shore at Two Mile, Fla., with a 6-foot by 
100-foot connecting channel to water of the same depth 
in Apalachicola Bay. Mean range of tide throughout 
this harbor is 1.6 feet. Extreme range, except during 
storms, is about 3 feet. Plane of reference is mean low 
water. "See Table 10-B for authorizing legislation." 
Local cooperation. Requirements have been fully 
complied with. 
Terminal facilities. Facilities consist of pile-and-timber 
wharves which are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
The U.S. pipeline dredge Guthrie, operating in Two 
Mile Channel February 23 to 28, 1969 removed 
181,475 cubic yards of material, and operating in St. 
George Island Channel March 1 to 11, 1969, removed 
21,785 cubic yards of material at a cost of $39,355. 
Miscellaneous investigations and surveys cost 
$4,324. Engineering, design, supervision and administration 
cost $12,062. 
Condition at end of fiscal year. The existing project, 
authorized by the 1954 River and Harbor Act, was 
completed in 1959, including reimbursement to local 
interests for approved work, as authorized by the 1958 
River and Harbor Act. Improvements at Two Mile 
were completed in September 1964. Total Federal costs 
under existing project as of June 30, 1970 were 
$912,337 for new work and $1,004,756 for maintenance, 
a total of $1,917,093. 
2. AQUATIC PLANT CONTROL (RIVER 
AND HARBOR ACT OF 1965) 
Location. Navigable water, tributary streams, connecting 
channels and other allied waters in Mobile 
District. 
Existing project. The authorized project provides for 
control and progressive eradication of water hyacinth, 
alligatorweed, Eurasian watermilfoil and other obnoxious 
aquatic plant growths from navigable water, 
tributary streams, connecting channels, and other 
allied waters of the United States, in the combined 
interest of navigation, flood control, drainage, agriculture, 
fish and wildlife conservation, public health, 
and related purposes, including continued research for 
development of the most effective and economical 
control measures to be administered by the Chief of 
Engineers, under the direction of the Secretary of the 
Army, in cooperation with other Federal and State 
agencies. Research and planning cost prior to construction 
shall be borne fully by the United States. "See 
Table 10-B for authorizing legislation." 
Local cooperation. Local interests shall agree to hold 
and save the United States free from claims that may 
occur from control operations and to participate to the 
extent of 30 percent of such operations. Requirements 
are being met in Florida, Louisiana, and Georgia. 
Operations and results during fiscal year. Treatment of 
aquatic plant growths in infested areas was as follows: 
332

MOBILE, ALA., DISTRICT 
Florida: The contractor's spray plant operating in 
the Apalachicola River Basin and coastal areas west of 
Florida Basin sprayed infested areas at a cost of $9,969, 
including $3,000 contributed funds. 
Georgia: No field operations were accomplished in 
Georgia during the fiscal year. 
Louisiana: The contractor's spray plant, operating 
in tributaries of Pearl River, sprayed infested areas at a 
cost of $1,816 including $665 contributed funds. 
Research totaling $9,952 continued under contract 
with Auburn University, Alabama and Athens College, 
Alabama and Memorandum of Agreement with 
U.S. Public health Service. 
Engineering, design, supervision and administration 
cost $3,423. 
Condition at end of fiscal year. Control operations in 
Florida and Louisiana were performed in previously 
treated areas to prevent re-infestation. Retreatment is 
necessary to maintain control. Surveys and investigations 
prerequisite to actual field operations in 
the State of Alabama have been completed. General 
Design Memorandum for Alabama is complete except 
for signed agreement by state authorities. A new 
contract with Crisp County Power Commission for 
control of acquatic growth removal on Lake Blackshear, 
Ga. has been prepared and submitted for 
approval. 
3. BAYOU CODEN, ALA. 
Location. The project is located in a small tidal stream 
on the southern coast of Mobile County, Alabama, 
emptying into Mississippi Sound about 7.6 miles 
northwest of Cedar Point, the southern tip of western 
mainland shore of Mobile Bay. (See Coast and 
Geodetic Survey Chart 1266.) 
Previous project. For details see Annual Report for 
1945, page 843. 
Existing project. The project provides for a channel 8 
feet deep by 60 feet wide extendig from La Belle 
Avenue bridge south for about 3,000 feet through the 
bayou to Portersville Bay, thence 8 feet deep by 100 
feet wide extending about 2.3 miles westward across 
Portersville Bay to connect with the Bayou La Batre 
channel, and a turning basin 8 feet deep by 60 feet wide 
by 100 feet long on the west side of the bayou channel 
about 500 feet south of the La Belle Avenue bridge. 
Mean tidal range is 1.75 feet, and extreme, except 
during storms, is 3.5 feet. Plane of reference is mean low 
water. "See Table 10-B for authorizing legislation." 
Estimated (1970) Federal cost for construction is 
$137,000 exclusive of $7,000 for non-Federal costs. 
Local cooperation. Requirements of local cooperation 
have been fully complied with for all work authorized 
prior to 1969. For work authorized in 1969, local 
interests must furnish suitable lands for spoil-disposal 
and aids to navigation; provide adequate public 
terminals; provide adequate depths in berthing areas; 
regulate the discharge of pollutants into the water of 
451-584 0-72-22 
the harbor; alter any utility facilities within the project 
area; hold the United States free from damages; and 
assume responsibility for all project cost in excess of 
$500,000. Local interests have indicated their willingness 
to comply. 
Terminal facilities. Small privately-owned pile-andtimber 
piers used in connection with fishing industry in 
this locality are adequate for existing commerce. A 
marina which will accommodate about 12 small 
recreational craft, and a slip with facilities for loading 
oyster shells are located near the mouth of the bayou, 
and are maintained by the Alabama Department of 
Conservation. 
Operations and results during fiscal year. New work: 
Preconstruction planning cost $2,113. 
Maintenance: The contractor's pipeline dredge 
Shamrock, operating March 10-17, 1970, removed 
35,000 cubic yards (est.) of material from Bayou Coden 
and Porterville Bay channels at a cost of $14,099. The 
U. S. dragline No. 2, with hired labor, performed 
snagging operations for two days at a cost of $1,181. 
Miscellaneous investigations and surveys cost $409. 
Engineering, design, supervision and administration 
cost $3,991. Reconnaissance and condition surveys cost 
$413. 
Condition at end of fiscal year. That portion of project 
authorized prior to 1969 modification was completed 
1956. Construction authorized 1969 has not be 
initiated. Total Federal costs under existing project as 
of June 30, 1970 were $14,086 for new work and 
$19,785 for maintenance, a total of $33,871. 
4. BAYOU LA BATRE, ALA. 
Location. Bayou La Batre is a tidal stream about 10 
miles long, emptying into Mississippi Sound on the 
southern coast of Mobile County, Ala., about 10 miles 
northwest of Cedar Point, the southern tip of the 
western mainland shore of Mobile Bay. (See Coast and 
Geodetic Survey Chart 1267.) 
Previous projects. For details see Annual Report for 
1945, page 844. 
Existing project. The authorized project provides for a 
12-foot by 100-foot channel from the 12-foot depth in 
Mississippi Sound to a point about 2,800 feet south of 
the highway bridge, thence a channel 12 feet by 75 feet 
to the bridge, an overall distance of about 33,500 feet, 
with the channel widened at a point 0.6 mile below the 
bridge to provide a turning basin 12 feet deep and 
about 2.6 acres in area. Mean tidal range is 1.75 feet, 
and extreme, except during storms, is 3.75 feet. Plane of 
reference is mean low water. "See Table 10-B for 
authorizing legislation." 
Local cooperation. Fully complied with. 
Terminal facilities. Wooden wharves have been provided 
at seafood processing plants and public launching 
ramps are available. Facilities are considered 
adequate for existing commerce. 
33

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. New work: 
Payment of a claim by the Contractor for dredging 
during fiscal year 1966 cost $49,200. 
Maintenance: Contractor's pipeline dredge Shamrock, 
operating March 18-April 22, 1970, removed 
175,000 (est.) cubic yards of material from Bayou La 
Batre and Porterville Bay channels at a cost of $79,868. 
U. S. dragline No. 2 performed snagging operations in 
Bayou La Batre channel at a cost of $2,367. Miscellaneous 
investigations and surveys cost $1,575. 
Engineering, design, supervision, and administration 
cost $15,005. Reconnaissance and condition surveys 
cost $290. 
Condition at end of fiscal year. The existing project was 
modified December 30, 1966 under the discretionary 
authority of the Chief of Engineers to include a turning 
basin. The project was completed in March 1967. 
5. BILOXI HARBOR, MISS. 
Location. The project is located on Mississippi Sound 
in southeastern Mississippi, 32 miles by water west of 
Pascagoula Harbor, Miss., and 14 miles east of 
Gulfport Harbor, Miss. (See Coast and Geodetic 
Survey Chart 1267.) 
Previous projects. For details see page 584, Annual 
Report for 1962. 
Existing project. The authorized project provides for a 
continuous channel 12 feet deep, 150 feet wide and 23 
miles long from the Gulf Intracoastal Waterway 
through Mississippi Sound east of Deer Island, Biloxi 
Bay, Back Bay, Cranes Neck, and a land cut to 
Gulfport Lake, including a 500-foot by 2,600-foot basin 
in the lake, thence a 12-foot by 100-foot channel for 
about 2 miles westward from the west end of the lake, 
terminating in a 300-foot by 500-foot basin; a 12-foot 
by 100-foot channel from the main channel in Big Lake 
to and up Bayou Bernard to the Air Force oil terminal 
at about mile 2.6; adoption for maintenance of a 12- 
foot by 150-foot spur channel from the main channel in 
Biloxi Bay for about 1 mile, terminating in a 400-foot 
by 600-foot turning basin opposite Ott Bayou, and 
abandonment of the existing 6-foot by 40-foot channel 
to the bayou; continuation of maintenance of the 12- 
foot by 150-foot lateral channel westward about 2.2 
miles to Biloxi's south waterfront; continuation of 
maintenance of the 10-foot by 150-foot Federal project 
channel from Mississippi Sound, passing west of Deer 
Island to a point where it connects to the 12-foot by 
150-foot lateral channel at Biloxi's south waterfront 
and abandonment of the authorized modification 
providing for deepening the channel in that reach. 
Estimated cost of the project (1970) is $965,770, 
including $212,770 for improvements completed prior 
to 1966, and $753,000 for modifications authorized by 
the 1966 River and Harbor Act. That portion of the 
project providing for an entrance channel 6 feet deep, 
50 feet wide, and about 1,800 feet long into Old Fort 
Bayou, as authorized by the 1945 River and Harbor 
Act, is inactive and excluded from the foregoing cost 
estimate. Estimated cost (1954) of this portion was 
$6,000. "See Table 10-B for authorizing legislation." 
Local cooperation. Fully complied with. 
Terminal facilities. A number of wooden piling and 
timber piers for small craft and fishing boats, a bulk 
gasoline terminal, several boat ways, and concrete 
products plant are available. 
Operations and results during fiscal year. New- work: 
Engineering and design cost $5,036. Supervision and 
administration cost $322. 
Maintenance: The contractor's pipeline dredge 
Louisiana, performing maintenance dredging September 
25-November 22, 1969, removed 1,632,534 
cubic yards of material from East Access channel at a 
cost of $325,138. The contractor's pipeline dredge 
Shamrock, performing maintenance dredging January 
20-February 23, 1970, removed an estimated 170,000 
cubic yards of material at a cost of $10,473. Miscellaneous 
investigations and surveys cost $10,028. 
Engineering, design, supervision and administration 
cost $41,300. Reconnaissance and condition surveys 
cost $792. 
Condition at end offiscalyear. The existing project, prior 
to the modification authorized in 1966, was commenced 
in 1931 and completed in 1962. No work has 
been done on work authorized in 1966. Total Federal 
costs under existing project as of June 30, 1970 were 
$242,758 for new work and $300,630 for maintenance, 
a total of $543,388. 
6. BLACK WARRIOR AND TOMBIGBEE 
RIVERS, ALA. 
Location. Black Warrior River rises in northern 
Alabama above Birmingham and flows generally 
southwesterly to unite with the Tombigbee River at 
Demopolis, Ala. Thence, the Tombigbee flows south, 
uniting with the Alabama River to form the Mobile 
River 45 miles above the head of Mobile Bay. Distance 
by water from Mobile to the vicinity of Birmingham is 
about 415 miles. 
Previous projects. For details see page 732, Annual 
Report for 1938. 
Existing project. The authorized project provides 
essentially for a canalized channel 9 feet deep and 200 
feet wide from the mouth of the Tombigbee River, 45 
miles above Mobile, to the vicinity of Birmingham, via 
the Tombigbee and Black Warrior Rivers, to mile 
430.4 on Sipsey Fork, mile 429.6 on Mulberry Fork and 
mile 407.8 on Locust Fork, and for maintenance by 
snagging of Mobile River above the mouth of Chickasaw 
Creek, a total waterway distance of about 463 
miles. The total lift of 258 feet is accomplished by six 
locks and dams. The original construction program, 
consisting of 17 dams with 18 lifts, was completed in 
1915. Replacement of the original structures by new 
locks and dams, under the modernization program is as 
follows: William Bacon Oliver replaced locks 10, 11, 
334

MOBILE, ALA., DISTRICT 
and 12; Demopolis replaced locks 4, 5, 6, and 7; 
Warrior replaced locks 8 and 9; Jackson replaced locks 
1, 2, and 3; and Holt replaced locks 13, 14, 15, and 16. 
Thus, 16 of the original locks have been replaced by 5 
new locks. The Jackson lock and dam wildlife refuge, 
authorized in 1960, will include 4,250 acres within the 
reservoir area and along its boundaries. "See Table 10- 
B for authorizing legislation." 
Tidal influence extends upstream from Mobile 101.6 
miles to the old lock 1, where tidal effect is apparent 
only at low stages of the river. At Mobile the mean and 
extreme tidal ranges are 1.5 and 3.6 feet, respectively. 
These are at times slightly increased by the effect of 
winds. The greatest fluctuation of river stages is at 
Demopolis, Ala., the maximum being 59.7 feet. 
Maximum fluctuations at other points are 40 feet at 
lock 1, 101.6 miles from Mobile; 57.8 feet at Tuscaloosa, 
352.6 miles from Mobile; 13 feet at Birmingport, 
409.6 miles from Mobile; and 27 feet at 
Cordova, 429.6 miles from Mobile. Ordinary fluctuations 
at these points are at old lock 1, 20 feet; at 
Demopolis, 35 feet; at Tuscaloosa, 40 feet; at Birmingport, 
4 feet; and at Cordova, 7 feet. Works of 
improvement reduced the amount of fluctuations at 
different points by 3 to 10 feet. Estimated cost (1970) of 
new work is $125,311,000 exclusive of amounts 
expended on previous projects. Additionally, estimated 
costs of major rehabilitations at John Hollis Bankhead 
lock and dam is $38,400,000, and cost of providing 
recreation facilities at completed projects (Code 710) is 
$1,008,000. 
Local cooperation. Requirements of local cooperation 
have been fully complied with to date. 
Terminal facilities. Docks, storage facilities, and 
handling equipment have been provided as required at 
most loading and unloading points along the waterway. 
These include facilities for handling petroleum 
and petroleum products, coal, ores, sand and gravel, 
pulpwood, manufactures, and various other commodities. 
While most terminal facilities are privately 
owned, many are available for use by the general 
public. Facilities are considered adequate for existing 
commerce. (See Table 10-C of existing locks and 
dams.) 
Operations and results during fiscalyear. New work: 
John Hollis Bankhead lock and dam: Rehabilitation of 
spillway: Under contract: Drilling anchor holes cost 
$3,311, and installing pier anchors cost $808,869. 
Hired labor Engineering, design, supervision, and 
administration cost $51,018. 
Rehabilitation of lock and dam: Under contract: 
Reservoir surveys cost $8,538; relocations cost $883; 
dam cost $220; lock cost $10,220; channel cost 
$176,130. Hired labor: Advance engineering and 
design cost $170,681; land acquisitions cost $18,249; 
reservoir surveys cost $21,580; construction facilities 
cost $80,808; travel advances cost $800; and engineering, 
design, supervision, cost $566,760. 
Holt lock and dam: Under contract: Recreational 
facilities $57,145, and buildings, grounds, and utilities 
$6,418. Hired labor: Acquisition of lands $3,274; 
reservoir clearing $27; relocations $8; road construction 
$2,154; and engineering, design, supervision 
and administration $22,229. Credit for steel piling sold 
amounted to -$65,870. 
Warrior lock and dam: Recreational facilities provided 
at completed project (Code 710) cost $7,469. 
Demopolis lock and dam: Recreational facilities provided 
at completed project (Code 710) cost $40,278. 
Coffeeville lock and dam: Recreational facilities provided 
at completed project (Code 710) cost $18,085. 
Recreational attendance at locks and dams during 
CY 1969 totaled 48,800 recreational user days. 
Maintenance: The U. S. pipeline dredge Collins, 
operating in Black Warrior and Tombigbee Rivers, a 
total of 130 days, removed 1,778,794 cubic yards of 
material at a cost of $588,340. 
The U. S. snagboat Toro, operating in Black Warrior 
and Tombigbee Rivers, a total of 189 days, removed 
snags and obstructions from the channel at a cost of 
$159,960. Operation and care of locks cost $706,361. 
Maintenance of locks cost $750,888. Miscellaneous 
investigations and surveys cost $297,320. Engineering, 
design, supervision, and administration cost $439,181. 
Plant rental Upatoi cost $10,950 and plant rental Plant 
Barge cost $30,780. Plant rental Tallawampa cost 
$13,720. (See Table 10-C, for total costs of existing 
project to June 30, 1970.) 
Condition at end of fiscal year. Work on the project, 
commenced in 1887, was essentially completed in 1915. 
Since then three of the original locks and dams (10, 11, 
and 12) were replaced by William Bacon Oliver 
(Tuscaloosa) lock and dam which was opened to 
navigation in August 1939; four original locks and 
dams (4, 5, 6, and 7) were replaced by Demopolis lock 
and dam which was opened to navigation in August 
1954; two original locks and dams (8 and 90 were 
replaced by Warrior lock and dam which was opened 
to navigation in October 1957; three original locks and 
dams (1, 2, and 3) were replaced by Coffeeville lock 
and dam which was opened to navigation in August 
1960; and four original locks and dams (13, 14, 15, and 
16) were replaced by Holt lock and dam which was 
opened to navigation in December 1968. Rehabilitation 
of the spillway at John Hollis Bankhead 
lock and dam commenced in 1966, and physically 
completed 6 February 1970. Replacement of the 
double lift lock with a single lift lock at John Hollis 
Bankhead lock and dam commenced in April 1970 and 
is scheduled for completion March 1975. The power 
plant at John Hollis Bankhead lock and dam was built 
and is operated by the Alabama Power Co. Total 
Federal costs under existing project as ofJune 30, 1970 
were $104,630,555 for new work and $47,545,832 for 
maintenance, a total of $152,176,387. 
335

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
7. BLACKWATER RIVER, FLA. 
Location. The river rises in south-central Alabama 
and flows southwesterly 75 miles through Alabama and 
Florida, emptying into Blackwater Bay, an arm of 
Pensacola Bay (See Cost and Geodetic Survey Chart 
1265.) 
Previous projects. For details see Annual Report for 
1949. 
Existing project. The project provides for a 9-foot by 
100-foot channel from the mouth upstream for 12 miles 
to Milton. Plane of reference is mean low water. The 
improved portion of the river is tidal throughout. Mean 
range is 2 feet and extreme 3 feet, except during storms. 
"See Table 10-B for authorizing legislation." 
Local cooperation. None required. 
Terminal facilities. A terminal serving a grain elevator 
and a petroleum terminal at Milton, and natural 
landings along the river are considered adequate for 
existing commerce. 
Operations and results during fiscal year. Maintenance: 
Engineering, design, supervision, and administration 
cost $3. Reconnaissance and condition surveys cost 
$352. 
Condition at end of fiscal year. The existing project was 
commenced in 1906 and completed in 1916. Total 
Federal costs under existing project as of June 30, 1970 
were $36,650 for new work and $153,302 for maintenance, 
a total of $189,952. 
8. CADET BAYOU, MISS. 
Location. Cadet Bayou (also known as Bayou Caddy), 
is a small tidal stream in southwest Hancock County, 
Mississippi, which flows esterly through marshland and 
empties into Mississippi Sound about 10 miles southwest 
of Bay St. Louis, Mississippi. 
Existing project. The authorized project provides for a 
channel 8 feet deep and 100 feet wide extending from 
the 8-foot depth in Mississippi Sound for a distance of 
about 7,800 feet to the mouth of Cadet Bayou, thence a 
channel 8 feet deep and 80 feet wide extending 600 feet 
into the bayou to a turning basin 130 feet wide and 100 
feet long, thence a channel 6 feet deep and 60 feet wide 
continuing upstream for 9,350 feet. A second turning 
basin 110 feet wide and 100 feet long would be located 
900 feet downstream from the upper limit of the 
improvement. The total length of the improved 
channel is about 18,450 feet. Plane of reference is mean 
low water. Mean range of tide is about 1.6 feet in the 
vicinity of Cadet Bayou. Extreme range, except during 
storms is about 3.5 feet. "See Table 10-B for authorizing 
legislation." 
Local cooperation. Local interests must furnish suitable 
lands for spoil disposal and location of aids to 
navigation; provide adequate public terminal facilities 
including berths and public use shore facilities; 
establish regulations prohibiting discharge of untreated 
sewage, garbage, and other pollutants into the harbor; 
hold the United States free from damages; and make a 
cash contribution of 23.3 percent of the first cost of 
construction to be performed by the Corps of Engineers, 
presently estimated at $29,000. 
Terminal facilities. Several privately-owned pile-andtimber 
wharves, a boatyard, marine ways near the 
mouth, and several natural landings are located along 
the bayou. A fishing camp at mile 2 provides necessary 
facilities for recreational boating needs, including 
about 250 feet of marginal wharf. Local interests will 
be required to provide, maintain, and operate a public 
wharf for commercial boating interests near the mouth 
of the bayou, and another for recreational boating 
interests in the upper reaches. 
Operations and results during fiscal year. New work: 
Preconstruction planning cost $13,662. 
Condition at end of fiscal year. Construction has not been 
initiated. 
9. DAUPHIN ISLAND BAY, ALA. 
Location. The project is located between Dauphin and 
Little Dauphin Islands on the west side of the entrance 
to Mobile Bay, about 30 miles south of Mobile, Ala., 
and 55 miles west of Pensacola, Fla. (See Coast and 
Geodetic Survey Chart 1266.) 
Existing project. The authorized project provides for: 
(a) A channel 7 feet deep and 150 feet wide from 
Mobile Bay to an anchorage basin of the same depth, 
and about 7 acres in area, in the marsh just north of 
Fort Gaines on Dauphin Island; a channel 4 feet deep 
and 40 feet wide from the anchorage basin to Dauphin 
Island Bay; and a jetty and revetment to protect the 
entrance channel; and (b) an anchorage basin 7 feet 
deep and 500 feet square at Dauphin Island village, 
with an entrance channel of like depth, 100 feet wide 
and about 8,300 feet long, extending to the 7-foot 
hydrographic contour in Mississippi Sound. Mean 
tidal range is 1.1 feet, and extreme, except during 
storms, is about 4 feet. Plane of reference is mean low 
water. "See Table 10-B for authorizing legislation." 
Local cooperation. Requirements of local cooperation 
have been fully complied with to date. 
Terminal facilities. Several privately owned wharves 
for handling seafood, a public dock and mooring slip, 
and a pier for recreational craft are located on the 
village basin. A marina, public launching ramp, and a 
number of private piers are located on the bay. 
Facilities are considered adequate for existing commerce. 
Operations ard results during fiscal year. Maintenance: 
The contractor's pipeline dredge Titan, operating in 
Village channelJuly 1-9, 1969, removed 83,500 cubic 
yards (est.) of material (includes cost for removing an 
additional 26,000 cubic yards of material during 
previous fiscal year) all at a cost of $33,904. Contractor's 
pipeline dredge Shamrock, operating February 
24-March 9, 1970, removed 70,000 cubic yards (est.) 
336

MOBILE, ALA., DISTRICT 
of material at a cost of $13,988. U. S. dragline No. 2, 
with hired labor, operated two days, removing debris 
following Hurricane Camille, at a cost of $1,181. 
Miscellaneous investigations and surveys cost $1,644. 
Engineering, design, supervision, and administration 
cost $6,811. 
Condition at end of fiscal year. The project was 
completed in July 1959. 
10. DOG AND FOWL RIVERS, ALA. 
Location. Dog and Fowl Rivers are primarily tidal 
streams emptying into the west side of Mobile Bay, 8.5 
and 17 miles, respectively, south of central Mobile. 
Existing project. The Dog River project provides for an 
8-foot by 150-foot channel from about 3,000 feet east of 
the Mobile Bay ship channel to and up Dog River, a 
total distance of 26,200 feet, thence 6-feet by 100 feet 
for 12,300 feet to a point about 2,400 feet above the 
mouth of Halls Mill Creek, and a 6-foot by 100-foot 
spur channel from the main channel to the mouths of 
Perch and Halls Mill Creeks. Overall length of the 
improvement is about 7.8 miles. 
The Fowl River project provides for a channel 8 feet 
deep and 100 feet wide from Mobile Bay into and up 
Fowl River to deep water about 6,700 feet above its 
mouth. Total length of the channel is about 2.6 miles. 
Plane of reference is mean low water. Mean range of 
tide is about 1.5 feet in Dog River. Extreme range 
during storms is about 3.6 feet. "See Table 10-B for 
authorizing legislation." Estimated (1970) Federal cost 
for construction is $193,000, exclusive of $82,000 non- 
Federal costs. 
Local cooperation. Local interests must furnish all 
lands, easements, and rights-of-way required for 
construction and subsequent maintenance of the 
project, including suitable land for spoil disposal and 
location of aids to navigation; provide adequate public 
terminal facilities including berths and public use shore 
facilities; establish regulations prohibiting discharge of 
untreated sewage, garbage, and other pollutants into 
the harbor; hold the United States free from damages; 
and make a cash contribution of 47 percent of the first 
cost of construction for the Dog River portion of the 
project, and 10 percent for the Fowl River portion, 
presently estimated at $68,000 and $13,000, respectively. 
Terminal facilities. Existing facilities consist of a 
boatyard for fabricating steel vessel hulls, nine marinas, 
four marine ways, a yacht basin on Dog River; two 
marinas on Fowl River, and numerous timber piers 
and docks on both rivers. Facilities are considered 
adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Preconstruction planning during the fiscal year cost 
$14,355. 
Condition at end offiscalyear. Construction has not been 
initiated. 
11. EAST PASS CHANNEL FROM GULF 
OF MEXICO INTO 
CHOCTAWHATCHEE BAY, FLA. 
Location. East Pass channel is located in the entrance 
from the gulf into Choctawhatchee Bay at eastern end 
of Santa Rosa Island, 48 miles east of the entrance into 
Pensacola Bay and 49 miles west of the new entrance to 
St. Andrew Bay. (See Coast and Geodetic Survey 
Chart 1264.) 
Previous project. For details see page 672 of Annual 
Report for 1937. 
Existing project. The authorized project provides for a 
12-foot by 180-foot channel from the Gulf of Mexico 
into Choctawhatchee Bay, and a 6-foot by 100-foot 
channel from East Pass channel into Old Pass Lagoon. 
The project consists also of 2 converging jetties spaced 
1,000 feet apart at the seaward end. The west jetty is 
provided with a low weir section 1,000 feet long to 
permit passage of littoral drift into a dredged deposition 
basin 500 feet by 1,500 feet located between 
the west jetty and the navigation channel. Mean range 
of tide is 1.3 feet; extreme range, except during storms, 
is 2.5 feet. Plane of reference is mean low water. "See 
Table 10-B for authorizing legislation." 
Local cooperation. Responsibilities of local cooperation 
have been complied with to date. 
Terminal facilities. Small privately owned pile-andtimber 
piers used in connection with fishing industry in 
this locality are considered adequate for existing 
commerce. 
Operations and results during fiscalyear. New work: Jetty: 
Investigations and repairs to weir cost $7,444. Engineering 
and design cost $12,579. Supervision and 
administration cost $1,081. (Of these funds $7,676 were 
contributed funds). 
Maintenance: The U. S. pipeline dredge Guthrie, 
operating in the Entrance channel from July 1-11, 
1969, and April 14-18, 1970, removed 80,727 cubic 
yards of material at a cost of $11,575. The contractor's 
pipeline dredge Manchac, operating in the Entrance 
Channel and Impounding basin from February 
1.2-28, 1970, removed 118,460 cubic yards of material 
at a cost of $100,471. Repairs to spoil dike cost $65. 
Repairs to West Jetty cost $6,690. Remedial work on 
West Jetty cost $3,071. Miscellaneous investigations 
and surveys cost $292. Engineering, design, supervision, 
and administration cost $16,002. 
Condition at end of fiscal year. Construction on the 1965 
modification was commenced October 1967 and 
completedJanuary 1969. 
12. EAST PEARL RIVER, MISS. 
Location. The project is located in a main tributary of 
Pearl River, Mississippi and Louisiana, which forms 
the boundry between southern Louisiana and Mississippi. 
Its mouth is 35 miles by water west of Gulfport 
Harbor, Miss., and 35 miles east of New Orleans, La., 
337

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
via Gulf Intracoastal Waterway. (See Coast and 
Geodetic Survey Chart 1268). 
Previous projects. For details see page 1846 Annual 
Report for 1915 and page 504, Annual Report for 
1933. 
Existing project. The authorized project provides for a 
channel 9 feet deep, 200 feet wide, and about 1.3 miles 
long, at the mouth of East Pearl River, connecting the 
9-foot contour in Lake Borgne with the same contour in 
East Pearl River. Under ordinary conditions mean 
tidal range is about 1.75 feet; while the extreme range 
is about 3.5 feet. Plane of reference is mean low water. 
"See Table 10-B for authorizing legislation." 
Local cooperation. None required. 
Terminal facilities. Natural landings which are available 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
The contractor's pipeline dredge Shamrock, operating in 
the East Pearl River Bar Channel October 25-31, 
1969, performed maintenance dredging at a cost of 
$31,312. Miscellaneous investigations and surveys cost 
$4,764. Engineering, design, supervision, and administration 
cost $7,346. Reconnaissance and condition 
surveys cost $704. 
Condition at end of fiscal year. No construction work has 
been done on the project. Total Federal costs under 
existing project as of June 30, 1970 were $8,928 for new 
work and $222,607 for maintenance, a total of 
$231,535. 
13. ESCAMBIA AND CONECUH RIVERS, 
FLA. AND ALA. 
Location. A single stream which rises in central 
Alabama, flows southwesterly to the Florida State line, 
thence southerly through Florida to Escambia Bay, an 
arm of Pensacola Bay. That part of stream in Alabama 
is known as Conecuh River and that in Florida as the 
Escambia River. (See Coast and Geodetic Chart 1265.) 
Previous projects. For details see Annual Report for 
1961. 
Existing project. The project provides for a 10-foot by 
100-foot channel in Escambia Bay for 5.5 miles to the 
mouth of Escambia River, thence up Escambia River 
to about mile 7, thence a channel 5 feet deep for 50.9 
miles to the Florida State line, and thence improvement 
of Conecuh River to the mouth of Patsaliga 
Creek, a distance of 79.5 miles. The project, including 
the portion in Escambia Bay is 142.5 miles long. Plane 
of reference is mean low water. Mean range of tide at 
the mouth of the river is 1.5 feet and extreme range, 
except during storms, is 3 feet. Ordinary seasonal 
fluctuation at the state line does not exceed 8 feet. The 
highest flood stage on record (1929) was 31.3 feet at the 
state line and 50.6 feet at River Falls, Ala., 137.5 miles 
above the mouth. The existing project was completed 
in 1960 at a cost of $137,324. "See Table 10-B for 
authorizing legislation." 
Local cooperation. Responsibilities of local cooperation 
have been fully complied with to date. 
Terminal facilities. Chemstrand Corp., at mile 7, 
provides a barge slip and facilities for handling and 
storing industrial chemicals and other materials 
received at their plant. Gulf Power Co., at mile 4, 
maintains a slip, marginal wharf, and facilities for 
handling coal. These facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. Engineering, 
design, supervision and administration cost $478, all 
charged to maintenance. Reconnaissance and condition 
surveys cost $1,033. 
Condition at end of fiscalyear. The existing project, prior 
to adoption of the modification authorized by the 1958 
River and Harbor Act, was commenced in 1881 and 
completed in 1882. Construction of the modification 
authorized in the 1958 River and Harbor Act was 
commenced and completed in 1960. Total Federal 
costs under existing project as of June 30, 1970 were 
$137,324 for new work and $272 for maintenance, a 
total of $137,596. 
14. FLY CREEK, FAIRHOPE, ALA. 
Location. Fly Creek (Volanta Bayou) is a small stream 
about 4.5 miles long rising in Baldwin County, 
Alabama, 3 miles east of the town of Fairhope, from 
whence it flows northerly, thence westerly and southerly, 
to form an estuary on the eastern shore of Mobile 
Bay just north of Fairhope and about 13 miles 
southeast of Mobile, Alabama. (See U. S. Coast and 
Geodectic Survey Chart No. 1266.) 
Existing project. The authorized project provides for a 
channel 6 feet deep, 80 feet wide, and about 1,650 feet 
long from the 6-foot depth in Mobile Bay to a turning 
basin of the same depth, 100 feet wide and 350 feet 
long, in Fly Creek. Mean tidal range in the vicinity of 
the project is about 1.3 feet. The extreme range except 
during storms, is 3.5 feet. "See Table 10-B for 
authorizing legislation." 
Local cooperation. Fully complied with. 
Terminal facilities. The Fairhope Yacht Club has 
facilities for small recreational craft on both banks near 
the mouth of the creek, consisting of a small pile-andtimber 
service wharf, several sheet metal boat sheds, 
boat slips, and other mooring facilities. There is also a 
marginal timber wharf and shed for commercial fishing 
boats on the right bank of the creek immediately above 
the first bend. 
Operations and results during fiscal year Miscellaneous 
investigations and surveys cost $189. Engineering, 
design, supervision, and administration cost $83, all 
charged to maintenance. Reconnaissance and con-, 
dition survey cost $179. 
Condition at end of fiscal year. The project was 
commenced in August and completed in October, 
1957. 
338

MOBILE, ALA., DISTRICT 
15. GRAND LAGOON, PANAMA CITY, 
FLA. 
Location. On the north shore of St. Andrew Bay, an 
arm of the Gulf of Mexico on the northwest coast of 
Florida 110 miles east of Pensacola. (See U. S. Coast 
and Geodetic Chart 1263.) 
Existing project. The authorized project provides for 
an 8-foot by 100-foot channel in Grand Lagoon from 
St. Andrew Bay to a point about 2,400 feet east of the 
State Highway 392 bridge, thence branching to serve 
terminal facilities on the north and south shores, both 
channels terminating at the bridge. The western ends 
of the channel are connected by a channel 650 feet 
long, parrallel to the bridge. The connecting channel 
and the reaches opposite the terminal facilities are 150 
feet wide. Plane of reference is mean low water. Mean 
range of tide in the lagoon is 1.3 feet. The extreme 
rance except during storms, is about 3.0 feet. "See 
Table 10-B for authorizing legislation." 
Local cooperation. Local interests must furnish suitable 
lands for spoil disposal and aids to navigation; provide 
adequate public terminal facilities including berths 
and access channels; hold the United States free from 
damages; and make a cash contribution of 40.0 percent 
of the first cost of the general navigation facilities, such 
contributions are presently estimated at $27,000. 
Terminal facilities. None. 
Operations and results during fiscal year. Preconstruction 
planning cost $633. 
Condition at end of fiscal year. Plans and specifications 
are essentially completed. The sponsor has not provided 
the requirements of local cooperation to date; 
therefore the project is considered inactive. 
16. GULF INTRACOASTAL WATERWAY 
BETWEEN APALACHEE BAY, FLA., 
AND MEXICAN BORDER (MOBILE 
DIST.) 
Location. The project extends westward from Apalachee 
Bay, Fla., along the Gulf coast to the Rigolets, 
La., via a series of coastal lakes, bays, sounds, and land 
cuts. For further details see Annual Report for 1962. 
Previous projects. For details see page 906, Annual 
Report for 1930. 
Existing project. The authorized project provides for a 
waterway 12 feet deep and 125 feet wide at mean low 
water from Apalachee Bay, Fla., to Mobile Bay, Ala., 
and 12 feet deep and 150 feet wide from Mobile Bay, 
Ala., to the Rigolets, Louisiana (Lake Borgne Light 
No. 41), and for a tributary channel (Gulf County 
Canal), 12 feet deep, 125 feet wide, and about 6 miles 
long connecting Intracoastal Waterway at White City, 
Fla., with St. Joseph Bay. The waterway between the 
12-foot depth contours in Apalachee Bay and Lake 
Borgne Light No. 41 at the Rigolets is 379 miles long. 
"See Table 10-B for authorizing legislation." 
Local cooperation. Responsibilities of local cooperation 
have been fully complied with for the work authorized 
prior to 1966. For modification of the Gulf County 
Canal which was authorized by the 1966 River and 
Harbor Act, local interests must provide without cost to 
the United States all lands, easements, and rights-ofway 
required for construction and subsequent maintenance 
of the project and for aids to navigation, and 
provide retaining dikes, bulkheads, and embankment 
required in connection with disposal of spoil, or the 
costs of such retaining works; hold and save the United 
States free from all damages due to construction and 
maintenance of the project, including damages to 
wharves, piers, bridges, and other structures; provide 
an maintain at local expense adequate terminal and 
transfer facilities open to all on equal terms; provide 
and maintain without cost to the United States depths 
in berthing areas commensurate with depths provided 
in related project area; and accomplish without cost to 
the United States such alterations as required in sewer, 
water supply, drainage, and other utilities facilities as 
well as their maintenance. 
Terminal facilities. Facilities are available for public 
use at Carrabelle, Apalachicola, Panama City, and 
Pensacola, Florida, Mobile and Bayou La Batre, 
Alabama; and Pascagoula, Biloxi, Gulfport, Pass 
Christian, and Bay St. Louis, Mississippi. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. 
Maintenance: Carrabelle-Apalachicola Bay section: 
The U. S. pipeline dredge Guthrie, operating January 
20-February 22, 1970, removed 453,853 cubic yards 
of material. U. S. dragline No. 2, operating January 
9-16, 1970, removed 9,480 cubic yards of material, all 
at a cost of $78,710. 
Apalachicola Bay-St. Andrew Bay section. The U. S. 
pipeline dredge Guthrie, operating March 12-13, 1970, 
removed 21,980 cubic yards of material at a cost of 
$16,855. The U. S. dragline No. 2, operating November 
1-December 19, 1969, and January 1-8, 
1970, removed 1,822 obstructions. The U. S. snagboat 
Montgomery, operating April 15-18, 1970, removed 
361 obstructions, all at a cost of $18,661. 
West Bay-Choctawhatchee Bay Section: The contractor's 
dredge Hendry No. 6, operating June 2, 30, 
1970, removed 60,000 cubic yards of material at a cost 
of $64,500. The U. S. dragline No. 2, using hired labor 
and operating December 29, 1969, and January 
8-April 15, 1970, removed 2,035 obstructions at a cost 
of $4,113, and operating January 9-16, 1970, removed 
14,440 cubic yards of material at a cost of 
$2,760. Government plant and hired labor, during 
March 30-31, 1970, broadcast fertilizer and during 
June 9-30, 1970, built 15,000 linear feet of spoil dikes, 
all at a cost of $10,978. 
Choctawhatchee Bay--Pensacola Bay section The contractor's 
pipeline dredge Manchac, operating July 
339

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
30-August 27, 1969, removed 148,619 cubic yards of 
material at a cost of $159,936. 
Pensacola Bay-Mobile Bay section- The contractor's 
pipeline dredge Duplex, operating in Bon Secour section 
November 22-December 16, 1969, removed 949,245 
cubic yards of material at a cost of $142,228. The 
contractor's pipeline dredge Shamrock, operating May 
20-24, 1970, removed 25,000 cubic yards of material 
at a cost of $9,013. Snagging with Government plant 
and hired labor cost $6,506. Construction of spoil dikes 
cost $460. The U. S. dragline No. 2, using hired labor, 
performed dredging operations at a cost of $1,725. 
Bank stabilization cost $11,959. Miscellaneous investigations 
and surveys cost $75,157. Engineering, 
design, supervision, and administration cost $164,670. 
Condition at end of fiscal year. The existing project is 
complete except for the portion between Apalachicola 
Bay and St. Marks, Fla., which is deferred for restudy. 
Total costs of the existing project to June 30, 1970, were 
$15,279,022, of which $6,434,693 was for new work 
(includes $340,000 emergency relief funds), and 
$8,844,329 for maintenance. Modification of the Gulf 
County Canal to provide a 12-foot by 125-foot channel 
was commenced July 1968 and completed June 1969. 
17. GULFPORT HARBOR, MISS. 
Location. The project is located on Mississippi Sound 
in southeastern Mississippi, about 44 and 90 miles by 
water west of Pascagoula Harbor, Miss., and Mobile 
Harbor, Ala., respectively, and 78 miles east of New 
Orleans (via Gulf Intracoastal Waterway). (See Coast 
and Geodetic Survey Chart 1267.) 
Previous projects. For details see page 747, Annual 
Report for 1938, and page 995, Annual Report for 
1948. 
Existing project. The authorized project provides for: 
(a) A channel 32 feet deep, 300 feet wide, and about 8 
miles long across Ship Island Bar, a channel 30 feet 
deep, 220 feet wide, and about 11 miles long through 
Mississippi Sound, and an anchorage basin at Gulfport 
30 feet deep, 1,320 feet wide, and 2,640 feet long; and 
(b) maintenance of the existing commercial small-boat 
harbor about 26 acres in area, and a straight-approach 
channel, 100 feet wide and about 4,300 feet long, from 
deep water in Mississippi Sound to a small-boat basin, 
all at a depth of 8 feet. Under ordinary conditions 
mean tidal range is about 1.75 feet, and extreme range, 
except during storms, is about 3.5 feet. Plane of 
reference is mean low water. "See Table 10-B for 
authorizing legislation." 
Local cooperation. Conditions of local cooperation have 
been fully complied with to date. 
Terminal facilities. Existing modern rail-connected 
terminal facilities at this port are considered adequate 
for existing commerce. (See Port Series 19, revised in 
1960.) 
Operations and results during fiscal year. Maintenance: 
The contractor's pipeline dredge Port Arthur, performing 
maintenance dredging July 1-August 11, 
1969, removed 897,269 cubic yards of material from 
the Mississippi Sound channel and portions of the 
Anchorage Basin at a cost of $387,002 (includes 
payment for dredging performed in F.Y. 1969). The 
contractor's pipeline dredge Duplex, operating September 
2-October 7, 1969, removed 2,767,140 (est.) 
cubic yards of material from the Mississippi Sound 
Channel at a cost of $294,400. The U. S. hopper dredge 
Gerig, operating November 28-December 18, 1969, 
and January 10-17, 1970, removed 1,278,981 cubic 
yards of material from the Outer Bar Channel at a cost 
of $399,314. Snagging was performed by the U. S. 
dragline No. 2, using hired labor, in the Gulfport Ship 
Basin August 28-31, 1969; and by the U. S. snagboat 
Toro, operating in the Gulfport Small Craft Basin, 
September 1-12, 1969, all at a cost of $34,969; and 
contractor's snagging unit and attendant plant in 
Gulfport Anchorage Basin and Small Craft Basin, 
September 3-October 13, 1969, at a cost of $46,658. 
Miscellaneous investigations and surveys cost $82,175. 
Engineering, design, supervision, and administration 
cost $78,972. 
Condition at end of fiscal year. Main harbor was 
commenced 1932 and completed April 1950. Maintenance 
for small boat harbor and approach channel, 
constructed by local interests in 1950, was authorized 
by 1958 River and Harbor Act. Total Federal costs 
under existing project as of June 30, 1970 were 
$635,758 for new work and $9,207,008 for maintenance, 
a total of $9,842,766. 
18. LA GRANGE BAYOU, FLA. 
Location. The waterway is an arm of Choctawhatchee 
Bay, Fla., about 70 miles east of Pensacola Harbor and 
about 46 miles west of Panama City, Fla. The 
waterway is 3.5 miles long from its mouth through La 
Grange Bayou and Four Mile Creek to the town of 
Freeport, Florida. (See U. S. Coast and Geodetic 
Survey Chart No. 1264.) 
Previous project. For details see page 869, Annual 
Report for 1931, and page 671, Annual Report for 
1937. 
Existing project. The authorized project provides for a 
channel 12 feet deep, 100 feet wide, and about 6 miles 
long from Choctawhatchee Bay to the highway bridge 
across Four Mile Creek, and a turning basin of the 
same depth 200 feet wide and 400 feet long at Freeport, 
Florida. Plane of reference is mean low water. Normal 
tidal range is about 0.5 feet. Extreme range, except 
during storms, is about 3 feet. 
The existing project was completed in May 1963 at a 
cost of $289,496. "See Table 10-B for authorizing 
legislation." 
Local cooperation. Fully complied with. 
340

MOBILE, ALA., DISTRICT 
Terminal facilities. Available terminal facilities consist 
of small wharves and landings for small craft. There 
are also privately owned storage tanks for petroleum 
products and molasses at Freeport, Florida. Facilities 
are considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous investigations and surveys cost $65. 
Engineering, design, supervision and administration 
cost $6,750. Reconnaissance and condition surveys cost 
$253. 
Condition at end of fiscal year. Dredging to secure project 
dimensions under existing project was completed in 
January 1961. Dredging access channels to private 
beaches through spoil banks was completed in May 
1963. Total Federal costs under existing project as June 
30, 1970 were $289,496 for new work and $58,441 for 
maintenance, a total of $347,937. 
19. MOBILE HARBOR, ALA. 
Location. The project is located along the lower 5 
miles of Mobile River, in southwestern Alabama, 91 
miles by water west of Pensacola Harbor, Fla., 90 miles 
east of Gulfport Harbor, Miss., and 144 miles by water 
northeast of mouth of Mississippi River. (See Coast and 
Geodetic Survey Chart 1266.) 
Previous projects. For details see page 503, Annual 
Report for 1963. 
Existing project. The authorized project provides for: 
(a) A 42-foot by 600-foot channel about 1.5 miles long 
across Mobile Bar; (b) a 40-foot by 400-foot channel in 
Mobile Bay to mouth of Mobile River; (c) a 40-foot 
channel in Mobile River to highway bridge, varying 
from 500 to 775 feet wide; (d) a 25-foot channel from 
highway bridge to and up Chickasaw Creek to a point 
400 feet south of mouth of Shell Bayou, widths being 
500 feet in Mobile River and 250 feet in Chickasaw 
Creek; (e) a turning basin 40 feet deep, 2,500 feet long, 
and 800 to 1,000 feet wide, opposite Alabama State 
docks; (f) a turning basin 40 feet deep, 800 feet wide, 
and 1,400 feet long opposite Magazine Point; (g) a 27- 
foot by 150-foot channel from Mobile Bay Channel 
along Arlington pier to a turning basin 800 feet long 
and 600 feet wide opposite Brookley Air Force Base 
ocean terminal, and continuing thence to a turning 
basin 250 feet wide and 800 feet long in Garrows Bend, 
thence a 22-foot by 150-foot channel to the causeway 
linking McDuffie Island to the mainland; and (h) 
maintenance of Three Mile Creek by snagging, from its 
intersection with Industrial Canal to Mobile River. 
The project provides also for an anchorage area 32 feet 
deep, 100 feet wide, and 2,000 feet long opposite site 
formerly occupied by the U. S. Quarantine Station at 
McDuffie (Sand) Island. Prior to widening the Mobile 
Bay Channel as authorized in 1954, the Quarantine 
Station anchorage area was maintained to a project 
width of 200 feet. Construction by local interests of a 
solid-fill causeway across Garrows Bend Channel 
between McDuffie Island and the mainland is also 
provided for under existing project. Total length of the 
bay and river channels is about 41.7 miles. Plane of 
reference is mean low water. Under ordinary conditions 
mean tidal range at the lower end of the 
improvement is 1.2 feet and at the upper end 1.5 feet. 
Extreme tidal range is 3.4 feet at the lower end and 3.6 
feet at the upper end. "See Table 10-B for authorizing 
legislation." 
Local cooperation. Requirements of local cooperation 
have been fully complied with to date. 
Terminal facilities. Modern rail-connected terminal 
facilities at this port are considered adequate for 
existing commerce. (See Port Series No. 18, revised in 
1960.) 
Operations and results during fiscal year. Maintenance: 
The contractor's pipeline dredge Fritz Jahncke, performing 
maintenance dredging September 14, 
1969-February 10, 1970, removed 8,437,162 cubic 
yards of material from Mobile Bay Channel, and the 
contractor's pipeline dredge Paul F. Jahncke, operating 
May 1-June 30, 1970, removed 527,200 cubic yards of 
material from Mobile River and Bay channels, all at a 
cost of $1,117,417. 
The U. S. hopper dredge Langfitt, operating 
January 13-February 4, 1970, removed 361,815 cubic 
yards of material at a cost of $181,467. Miscellaneous 
investigations and surveys cost $44,954. Engineering, 
design, supervision, and administration cost $103,548. 
Contributed funds amounted to $12,000. 
Condition at end of fiscal year. The existing project was 
commenced in 1931 and completed in July 1965. For 
details see Annual Report for 1965. (See table 10-D at 
end of chapter for cost of existing project to June 30, 
1969.) Total Federal costs under existing project as of 
June 30, 1970 were $7,805,833 for new work and 
$15,685,608 for maintenance, a total of $23,491,441. 
20. PANAMA CITY HARBOR, FLA. 
Location. The project is located on the northwest coast 
of Florida, 102 miles east of entrance to Pensacola 
Harbor. (See Coast and Geodetic Survey Chart 1263.) 
Previous project. For details see page 710, Annual 
Report for 1938. 
Existing project. The authorized project provides for a 
channel about 2.6 miles long extending from deep 
water in the bay across Lands End to the Gulf of 
Mexico, 300 feet wide and 32 feet deep in the bay and 
across Lands End and 450 feet wide and 34 feet deep in 
the approach channel in the gulf, and protected by two 
jetties, each about 700 feet long; and a channel in 
Watson Bayou 100 feet wide and 10 feet deep from that 
depth in St. Andrew Bay to the highway bridge, about 
1.75 miles. Mean tidal range is 1.3 feet. Extreme range, 
except during storms, is about 4 feet. Plane of reference 
is mean low water. "See Table 10-B for authorizing 
legislation." 
Local cooperation. Fully complied with. 
341

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Terminal facilities. Available terminal facilities are 
considered adequate for existing commerce. (See Port 
Series No. 19, revised in 1957.) 
Operations and results during fiscal year. Maintenance: 
Miscellaneous investigations and surveys cost $213. 
Engineering, design, supervision and administration 
cost $94. Reconnaissance and condition surveys cost 
$1,274. 
Condition at end of fiscal year. The existing project was 
commenced in 1933 and completed in November 1949. 
Repairs to jetties were commenced in June 1961 and 
completed October 1968. (See table 10-D at end of 
chapter for costs of existing project to June 30, 1969.) 
Total Federal costs under existing project as of June 30, 
1970 were $1,144,484 for new work and $2,549,479 for 
maintenance, a total of $3,693,963. 
21. PASCAGOULA HARBOR, MISS. 
Location. The project is located along lower 6.8 miles 
of Pascagoula River, the lower 6 miles of Dog River, 
and in Bayou Casotte (about 4 miles east of mouth of 
Pascagoula River), in southeastern Mississippi, about 
61 miles by water west of Mobile Harbor, Ala., and 
about 44 miles by water east of Gulfport Harbor, 
Mississippi. (See Coast and Geodetic Survey Chart 
1267.) 
Previous projects. For details see page 741, Annual 
Report for 1938. 
Existing project. The authorized project provides for: 
(a) An entrance channel 40 feet deep and 350 feet wide 
from the Gulf of Mexico through Horn Island Pass, 
including an impounding area for littoral drift, 40 feet 
deep, 200 feet wide, and about 1,500 feet long adjacent 
to the channel at the west end of Petit Bois Island; (b) a 
channel 38 feet deep and 350 feet wide in Mississippi 
Sound and Pascagoula River to the railroad bridge at 
Pascagoula, including a turning basin 2,000 feet long 
and 950 feet wide (including channel area) on the west 
side of the river below the railroad bridge; (c) a 
channel 38 feet deep and 225 feet wide from the ship 
channel in Mississippi Sound to the mouth of Bayou 
Casotte, thence 38 feet deep and 300 feet wide for about 
1 mile to a turning basin 38 feet deep, 1,000 feet wide, 
and 1,750 feet long; (d) a 22-foot by 150-foot channel 
up Pascagoula River from the railroad bridge to the 
mouth of Dog River, thence up Dog River to Highway 
63 bridge; and (e) a 12-foot by 125-foot channel from 
the highway bridge, via Robertson and Bounds Lakes, 
to mile 6 on Dog River. Under ordinary conditions 
mean tidal range is 1.75 feet, and extreme range is 3.75 
feet. Plane of reference is mean low water. "See Table 
10-B for authorizing legislation." 
Local cooperation. Fully complied with. 
Terminal facilities. Modern rail-connected terminal 
facilities at this port are considered adequate for 
existing commerce. (See Port Series No. 19, revised in 
1957.) 
Operations and results during fiscal year. Maintenance: 
The contractor's dredge Orleans, performing maintenance 
dredging July 1-27, 1969, removed 1,511,456 
cubic yards of material from Pascagoula and Bayou 
Casotte Channels and the impounding area at the west 
end of Petit Bois Island at a cost of $558,799. 
Miscellaneous investigations and surveys cost $5,155. 
Engineering, design, supervision, and administration 
cost $12,881. Emergency work following hurricane 
Camille: operating August 25-September 27, 1969, 
removed 1,847,340 cubic yards of material from 
Mississippi Sound, portions of Pascagoula and Bayou 
Casotte Channels and the Impounding Basin at the 
west end of Petit Bois Island at a cost of $231,500. The 
U. S. hopper dredge Gerig, operating in the Outer Bar 
Channel January 27-February 14, 1970, removed 
445,477 cubic yards of material, and the U. S. hopper 
dredge McFarland, operating in the Outer Bar Channel 
September 1-October 15, 1969, removed 1,994,454 
cubic yards of material, all at a cost of $515,922. 
Snagging cost $1,182. Miscellaneous investigations and 
surveys cost $21,985. Engineering, design, supervision, 
and administration cost $58,883. 
Condition at end of fiscal year. The existing project was 
completed in August 1965. Total costs of existing 
project to June 30, 1970 were $5,668,543 for new work 
and $6,112,153 for maintenance, a total of 
$11,780,696. 
22. PASS CHRISTIAN HARBOR, MISS. 
Location. The project is on Mississippi Sound in 
southeastern Mississippi, 9 miles west of Gulfport 
Harbor, Miss., and 68 miles east of New Orleans, 
Louisiana (via Gulf Intracoastal Waterway.) (See 
Coast and Geodetic Survey Chart 1268.) 
Existing project. The authorized project provides for 
maintenance of a harbor within existing bulkheads and 
breakwaters constructed by local interests, and maintenance 
of an entrance channel, both to a depth of 7 
feet. The entrance channel is 100 feet wide and the 
harbor is about 1,000 feet along the shore by 700 feet 
wide. Mean range of tide is 1.75 feet and extreme range 
is 3.5 feet. Plane of reference is mean low water. "See 
Table 10-B for authorizing legislation." 
Local cooperation. Fully complied with. 
Terminal facilities. Available facilities consist of 
wooden piers for recreational and commercial small 
craft, public launching ramp, and two public docks 
with electric hoists. Facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. Maintenance: 
The contractor's snagging unit performed snagging 
operations in Pass Christian Basin September 
30-October 31, 1969 at a cost of $26,889. Miscellaneous 
investigations and surveys cost $1,373. 
Engineering, design, supervision, and administration 
cost $1,954. Reconnaissance and condition surveys cost 
$307. 
342

MOBILE, ALA., DISTRICT 
Condition at end of fiscal year. The project was 
commenced in April and completed in June, 1959. 
23. PEARL RIVER, MISS. AND LA. 
Location. Pearl River rises in east central Mississippi 
and flows southwest about 172 miles to Jackson, 
Mississippi, thence southeast about 269 miles to the 
head of its delta, whence West Pearl River flows about 
34 miles to the Rigolets, a tidal pass connecting Lake 
Pontahartrain with Lake Borgne, an arm of the Gulf of 
Mexico. 
Previous projects. For details, see page 750, Annual 
Report for 1938 and page 463, Annual Report for 
1965. 
Existing project. The authorized project provides for a 
channel from the mouth of West Pearl River for 58 
miles to the mouth of Bogalusa Creek at Bogalusa, 
Louisiana, 7 feet deep at low water with a bottom 
width of 100 feet in the river sections and 80 feet in the 
canal section; with locks 65 by 310 feet clear inside 
dimensions. The plan of improvement may be divided 
into three sections as follows: The river section from the 
mouth of West Pearl River to mile 28.5 at Holmes- 
Bayou with a channel 7 feet deep and 100 feet wide, to 
be obtained by dredging, snagging, and construction of 
cutoffs and easement of critical bends at eight locations 
below lock one along Pearl River in its reach from its 
mouth to mile 26, all at a depth of 7 feet; the canal 
section from mile 28.5 to 48.7 at Pools Bluff with a 
channel 7 feet deep and 80 feet wide, to be obtained by 
construction of three locks in the canal with sills across 
Bogue Chitto at mile 44 and across the river at mile 
48.7; the river section from mile 48.7 to 58 at the mouth 
of Bogalusa Creek, to be obtained by dredging, 
snagging, easing of bends. At Bogalusa the mean 
variation of water surface is 10 feet and extreme, 23 
feet. Plane of reference is mean low water. 
Estimated cost of the project (1970) is $9,024,494 
including $8,274,494 for improvements completed 
prior to 1966, and $750,000 for modifications authorized 
by the 1966 River and Harbor Act. Estimated 
(1970 cost for providing recreational facilities (Code 
710) is $180,900. (See Table 10-E for features of locks 
included in existing projects.) 
Local cooperation. Fully complied with. 
Terminal facilities. The city of Bogalusa provides a 
barge terminal consisting of a wharf, transit shed, and 
access road at Richardson's Landing at the head of the 
project. A privately owned wharf at the Pearl River 
Highway Bridge near Pearl River Station, La., is used 
for unloading logs. Only natural landings exist at 
various locations on the river. Facilities are considered 
adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Construction of recreational facilities at the completed 
project (Code 710) cost $2,472. Maintenance: Miscellaneous 
investigations and surveys cost $30,827. 
Operations and ordinary care of locks cost $59,643. 
Maintenance of locks cost $18,947. Engineering, 
design, supervision, and administration cost $49,563. 
Recreational attendance at the locks and dams during 
CY 1969 totaled 96,900 recreational user days. 
Conditions at end of fiscal year. The existing project, 
prior to adoption of modifications authorized by the 
1966 River and Harbor Act, was commenced in 
October 1938 and completed in January 1956. All 
locks were opened to navigation in November 1953. No 
work has been initiated on modifications (cut-offs and 
easements of bends below lock 1) authorized by the 
1966 Act. Total Federal costs under existing project as 
of June 30, 1970, were $8,301,436 for new work and 
$2,153,679 for maintenance, a total of $10,455,115. 
24. PENSACOLA HARBOR, FLA. 
Location. The project is located in a landlocked bay 
on the coast of northwest Florida about 50 miles east of 
entrance to Mobile Bay. (See Coast and Geodetic 
Survey Charts 490 and 1265.) 
Previous projects. For details see Annual Report for 
1938. 
Existing project. The authorized project provides for: 
(a) A 35-foot by 500-foot entrance channel about 5 
miles long, from the Gulf of Mexico to lower Pensacola 
Bay; (b) A 33-foot by 300-foot bay channel; (c) Two 
33-foot by 300-foot parallel approach channels to 
opposite ends of the inner-harbor channel; (d) An 
inner-harbor channel 500 feet wide, 33 feet deep, and 
3,950 feet long; (e) A 30-foot by 250-foot approach 
channel to the pierhead line south of Muscogee wharf; 
and (f) A 15-foot by 100-foot entrance channel into 
Bayou Chico, thence a channel 14 feet deep, 75 feet 
wide, and about 4,400 feet long to a turning basin 14 
feet deep and 500 feet square. Mean range of tide 
throughout the harbor is about 1.1 feet near the 
entrance and about 1.6 feet at the head of bay. Extreme 
tidal range, except during storms, is about 3 feet. Plane 
of reference is mean low water. Modification of the 
Bayou Chico project to provide for enlarging the 
entrance channel to 21 by 100 feet, the bayou channel 
to 20 by 100 feet, and deepening the turning basin to 20 
feet has been deferred for restudy. Estimated (1955) 
cost of this portion was $152,000. "See Table 10-B for 
authorization legislation." 
Local cooperation. Fully complied with. 
Terminal facilities. Modern rail-connected terminal 
facilities at this port are considered adequate for 
existing commerce. (See Port Series No. 19, revised in 
1969.) 
Operations and results during fiscal year. Maintenance: 
The contractor's pipeline dredge Manchac, performing 
maintenance dredging in Bay Channel and Inner 
Harbor Channels November 26--December 9, 1969, 
and December 19, 1969-January 9, 1970 removed 
1,427,906 cubic yards of material at a cost of $336,639. 
Miscellaneous investigations and surveys cost $8,482. 
Engineering, design, supervision and administration 
343

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
cost $18,212. Removal of old piling cost -$3,439. 
Liquidated damages were -$3,620. In addition to 
maintenance performed with civil funds, the U. S. 
hopper dredge Gerig, performing maintenance dredging 
December 19, 1969-January 9, 1970, removed 
239,637 cubic yards of material from the Entrance 
Channel and Navy Turning Basin with military funds. 
Reconnaissance and condition surveys cost $313. 
Condition at end of fiscal year. New work is completed 
except those features which are deferred for restudy. 
The modification authorized in 1962 was commenced 
in March and completed in May 1965. Total costs of 
the existing project to June 30, 1970 were $875,005 for 
new work and $2,167,510 for maintenance, a total of 
$3,042,515. 
25. PERDIDO PASS CHANNEL, ALA. 
Location. The project is located about midway 
between Pensacola, Fla., and Mobile, Alabama. (See 
Coast and Geodetic Chart 872.) 
Existing project. The existing project provides for a 
channel 12 feet deep and 150 feet wide for about 1,300 
feet from the Gulf of Mexico into the inlet, thence 9 feet 
deep and 100 feet wide for about 2,200 feet to the 
highway bridge, where the channel branches into two 
arms each having dimensions of 9 by 100 feet, one of 
which extends about 3,400 feet into Terry Cove and the 
other about 3,200 feet into the southern arm of Perdido 
Bay. The project also provides for 2 jetties spaced 600 
feet apart at the seaward end. The east jetty has a low 
weir section 1,000 feet long to permit passage of littoral 
drift into a dredged deposition basin 800 by 1,200 feet 
located between the east jetty and the navigation 
channel. "See Table 10-B for authorizing legislation." 
Local cooperation. Requirements of local cooperation 
have been fully complied with to date. 
Terminal facilities. Six marinas, numerous timber 
piers, docks, and several launching ramps are available. 
These facilities are considered adequate for 
existing commerce. 
Operations and results during fiscal year. New work: 
Engineering and design cost -$3,078. Maintenance: 
Contractor's pipeline dredge Shamrock, operating in 
Perdido Pass May 1-19, 1970, removed 90,000 (est.) 
cubic yards of material from the channel at a cost of 
$28,290. Miscellaneous investigations and surveys cost 
$10,782, engineering, design, supervision and administration 
cost $13,871, (Regular Funds). Contributed 
funds amounted to $37,863. 
Condition at end of fiscal year. The existing project was 
commenced May 1968 and completed in March 1969. 
26. PORT ST. JOE HARBOR, FLA. 
Location. The project is located on the northwest coast 
of Florida, 115 miles east of Pensacola Harbor. (See U. 
S. Coast and Geodetic Survey Chart No. 1263.) 
Existing project. The authorized project provides for: 
(a) An entrance channel 37 feet deep, 500 feet wide at 
its outer end and diminishing progressively in width to 
400 feet at the first bend, a distance of 3.6 miles, thence 
continuing at a depth of 37 feet and a width of 400 feet, 
through the second and third bend for 3.3 miles, thence 
continuing at a depth of 35 feet and a width of 300 feet 
2.4 miles to a point in St. Joseph Bay where entrance 
channel joins the north channel, a total overall distance 
of 9.3 miles, thence continuing in north channel at a 
depth of 35 feet and a width of 300 feet to the north end 
of the turning basin at Port St. Joe, a distance of about 
4.7 miles; (b) a turning basin 32 feet deep, 1,000 feet 
wide, and 2,000 feet long, and a harbor channel therein 
35 feet deep, 250 feet wide, and 2,000 feet long, 
adjacent to the waterfront at Port St. Joe; and (c) a 
channel 27 feet deep, 200 feet wide and about 1 mile 
long leading from the south end of the turning basin to 
deep water in St. Joseph Bay. Average tidal variation is 
1.4 feet and extreme, except during storms, is about 4 
feet. "See Table 10-B for authorizing legislation." 
Local cooperation. Fully complied with. 
Terminal facilities. Rail and highway-connected terminal 
facilities available at this port are considered 
adequate for existing commerce. (See Port Series No. 
19, revised in 1957.) 
Operations and results during fiscal year. Maintenance: 
The contractor's pipeline dredge Manchac, operating in 
the entrance channel, and silting basin during January 
1-31, March 15-31, and April 1-7, 1970, removed 
327,094 cubic yards of material at a cost of $164,786. 
Miscellaneous investigations and surveys cost $1,364. 
Engineering, design, supervision, and maintenance 
cost $13,050. Reconnaissance and condition surveys 
cost $1,446. Removal of old piling cost -$6,825. 
Liquidated damages amounted to -$14,040, all 
charged to maintenance. 
Condition at end of fiscal year. The project was 
completed in July 1962. 
27. REMOVING WATER HYACINTH, 
MOBILE DISTRICT 
Location. The project is for all streams tributary to the 
gulf coast in Mobile District. 
Existing project. The authorized project provides for 
extermination or removal of plants from navigable 
waters of Florida, Alabama, Mississippi, Louisiana, 
and Texas, so far as they are or may become an 
obstruction to commerce, by any mechanical, chemical, 
or other means whatsoever; for construction and 
operation of boats equipped with suitable machinery 
for such removal, and construction and operation of log 
booms to prevent plants drifting from one stream to 
another. "See Table 10-B for authorizing legislation." 
Local cooperation. None required. 
Operations and results during fiscal year. The U. S. spray 
plant and hired labor operating in Mobile River delta 
344

MOBILE, ALA., DISTRICT 
from August 1-15, 1969 and April 6-June 30, 1970, 
sprayed 307 acres in: Alligator Creek, Apalachee River 
Cut-off, Avalon Bayou, Bat Creek, Bateau Bay, Big 
Bay John, Big Bayou Canot, Big Briar Creek and 
tributaries, Big Gravine Creek, Big Lizzard Creek, 
Black Creek, Bluefield Branch, Bluefish Branch, 
Chingaling Bayou, Chuckafee Creek, Conway Creek, 
Dead Lake, Duck Bayou, Halfway Creek, Huffman 
Bay, Irvings Lake, Little Bateau Bay, Little Bay John, 
Little Briar Creek, Little Lizzard Creek, Maple Bayou, 
McVay Lake, Mike's Creek, Mudhold Creek, Negro 
Lake, Oak Bayou, Oakleaf Bayou, One Mile Bayou, 
Owl Bayou, Railroad Creek, Sand Bayou, Slide Ends, 
Squirrel Bayou, Six Bits Bayou, Strom Creek, Tensaw 
River, William's Creek, Woods Creek, all at a cost of 
$11,843. 
Condition at end of fiscal year. The existing project, 
which is for maintenance, was commenced about 1899, 
and work has been carried on since that time. 
28. WATERWAY CONNECTING 
TOMBIGBEE AND TENNESSEE 
RIVERS, ALA. AND MISS. 
Location. The waterway extends from mile 215 in 
Pickwick pool on the Tennessee River, southerly 
through northeastern Mississippi and western Alabama, 
a total of 253 miles, to the confluence of the 
Black Warrior and Tombigbee Rivers at Demopolis, 
Ala. 
Previous projects. For details see Annual Report for 
1953. 
Existing project. The authorized project provides for a 
waterway 253 miles long, connecting the Tennessee 
and Tombigbee Rivers via the East Fork of Tombigbee 
River and Mackeys and Yellow Creeks. The plan of 
improvement consists of three sections: (1) The river 
section, a 9-foot by 300-foot channel for 168 miles 
between Demopolis and Amory, Mississippi; (2) the 
lateral canal section, 12 by 100 feet for 45 miles from 
Amory to Bay Springs; and (3) the divide section, a 12- 
foot by 300-foot channel (except in the 27-mile-long 
divide cut in which the bottom width would be 280 
feet) for 40 miles from Bay Springs through the 
dividing ridge to the Tennessee River. The total lift of 
341 feet to be accomplished by 10 locks. Estimated 
(1970) Federal cost for new work is $345,170,000, 
including $170,000 for work by the U. S. Coast Guard, 
plus $40,400,000 non-Federal cost for relocations and 
bridge alterations. "See Table 10-B for authorizing 
legislation." 
Local cooperation. Local interests must make and 
maintain alterations in highways and highway bridges 
and in sewer, water-supply, and drainage facilities and 
provide and maintain suitable and adequate river and 
canal terminals. Officials of the State of Mississippi 
were notified of these requirements on December 13, 
1949, and officials of the State of Alabama were 
notified on December 20, 1949. Legislation enabling 
boards of supervisors of the various counties concerned 
to enter into agreements with the United States relative 
to navigation projects was adopted by the State of 
Mississippi in 1950. A compact between the States of 
Alabama, Mississippi, Tennessee, Kentucky and Florida 
has been formed for the purpose of promoting the 
project. The name of this organization is the 
Tennessee-Tombigbee Waterway Development Authority. 
During its 1962 session the Mississippi Legislature 
authorized the formation of the Tombigbee River 
Valley Waterway Management District. The District 
was organized in accordance with the enabling 
legislation and is empowered to fulfill the requirements 
of local cooperation for the portion of the project in 
Mississippi. A satisfactory resolution has been furnished. 
During its 1967 session the Alabama Legislature 
authorized formation of a public corporation to 
be named the Tombigbee Valley Development Authority 
for the purpose of further development of the 
Tombigbee River and tributary streams. The organization 
was formed in accordance with the enabling 
legislation and in a referendum held 5 December 1967 
the voters of Alabama authorized a bond issue not to 
exceed $10,000,000 to finance participation in this 
project and the Tombigbee River and Tributaries 
project. A satisfactory resolution has been furnished. 
Terminal facilities. None. 
Operations and results during fiscal year. New work: 
Gainesville lock and dam. Advance engineering and 
design cost $516,621. 
Condition at end of fiscal year. No construction work has 
been done on the existing project. 
29. WOLF AND JORDAN RIVERS, MISS. 
Location. The project is located in southeastern 
Mississippi, 54 miles east of New Orleans. (See Coast 
and Geodetic Survey Chart 1268). 
Existing project. The project provides for a 7-foot by 
100-foot channel from the 6-foot contour in St. Louis 
Bay to 7-foot contour in each stream. Channel lengths 
are 1.6 miles in Wolf River and 2 miles in Jordan 
River. Plane of reference is mean low water. Mean 
tidal range is 1.75 feet and extreme range, except 
during storms, 3.5 feet. "See Table 10-B for authorizing 
legislation." 
Local cooperation. None required. 
Terminal facilities. Natural landings along these 
streams are considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
The contractor's pipeline dredge Shamrock, performing 
maintenance dredging during December 2, 
1969-January 5, 1970, removed 210,000 cubic yards 
of material at a cost of $46,479. The contractor's 
snagging unit performed snagging operations September 
30-November 7, 1969, at a cost of $7,440. 
345

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Miscellaneous investigations and surveys cost $2,293. 
Engineering, design, supervision, and administration 
cost $10,527. Reconnaissance and condition surveys 
cost $375. 
Condition at end of fiscal year. The existing project was 
commenced in 1907 and completed in 1908. 
30. RECONNAISSANCE AND CONDITION 
SURVEYS 
(See Table 10-F.) 
31. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See Table 10-G.) 
32. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION 
Emergency work under authority of Section 3 of the 1945 
River and Harbor Act. Snagging and clearing was done by 
contract, in the following locations: Bayou Caddy, 
Miss., at a cost of $14,352; Bayou La Batre, Ala., at a 
cost of $21,397; Joe Bayou, Fla., at a cost of $21,596; 
Mulatto Bayou at a cost of $14,817; and Pearl River, 
Miss., at a cost of $65,659. (Excludes $39,312 contributed 
funds received during fiscal year 1970 for the 
Pearl River, Miss., project.) 
Navigation activities pursuant to Section 107, Public Law 86- 
645 (Preauthorization). Fiscal year costs for preauthorization 
studies were: $4,664 for Apalachicola 
Bay-Two Mile, Fla., $136 for Dauphin Island Bay, 
Ala., and $335 for Bayou La Batre, Alabama. 
BEACH EROSION CONTROL 
33. AUTHORIZED BEACH EROSION 
CONTROL PROJECT 
(See Table 10H.) 
FLOOD CONTROL 
34. BALDWIN AND HANNON SLOUGHS, 
MONTGOMERY, ALA. 
Location. The project is in and adjacent to Montgomery, 
Alabama, in the south central part of the state. 
Baldwin Slough, from its source near the eastern city 
limits, flows westwardly for about 6.4 miles to enter 
Catoma Creek 16.2 miles above its confluence with the 
Alabama River at mile 282.1. Hannon Slough rises in 
eastern Montgomery, and flowing in a southwesterly 
direction for 3.6 miles where it joins Baldwin Slough 
about 1.3 miles above its mouth by way of a 2,200-foot 
cutoff. 
Existing project. The authorized project provides for 
improvement of Baldwin and Hannon Sloughs for 
flood control by clearing, snagging, rectification of the 
existing channels, and replacement or modification of 
existing bridges. Clearing and snagging on Baldwin 
Slough will be accomplished on a width of 200 feet 
from its mouth to the juncture of Hannon Slough, a 
distance of 6,665 feet. Rectification of Hannon Slough 
from its mouth to Woodley Road will provide bottom 
widths of 52 feet from its mouth to Station 50 + 00, 
thence, 44 feet to Station 100 + 00 and thence 30 feet to 
Station 130 + 50, the upper limits of the improvement. 
Channel slopes will be 1 vertical on 3 horizontal. "See 
Table 10-B for authorizing legislation." 
Local cooperation. Local interests must furnish all 
lands, easements, and rights-of-way necessary for the 
construction of the project; hold and save the United 
States free from damages due to the construction; and, 
maintain the project after completion in accordance 
with the regulations prescribed by the Secretary of the 
Army. They must also make all road, highway bridge 
and utility changes and relocations of fences, buildings 
and other improvements made necessary by the work 
and provide assurances that encroachment of the 
improved channel will not be permitted. In addition, 
they must notify annually all interested parties that 
inundation of the flood plain from floods of larger 
magnitude than the 10-year-frequency occurrence can 
be expected after the improvement is completed. 
Resolutions have been adopted which indicated a 
willingness to comply with these requirements. 
Operations and results during fiscal year. Engineering, 
design, supervision, and administration cost $5,541. 
Condition at end of fiscal year. Construction has not been 
initiated. 
35. JACKSON AND EAST JACKSON, MISS. 
Location. The project is on the Pearl River at Jackson, 
Miss., about 278 miles above mouth of the river. 
Existing project. The authorized project provides for 
improvement of the Pearl River at Jackson, Miss., for 
flood control, to be obtained by construction of levees 
about 62,620 feet long, three pumping stations, and 
5.04 miles of channel rectification including a cutoff 2.3 
miles long in the Pearl River. Estimated cost (1970) is 
$8,313,000 including $752,500 non-Federal contributions. 
"See Table 10-B for authorizing legislation." 
Local cooperation. Local interests must furnish lands 
and rights-of-way for construction; make changes, 
alterations, additions, or relocation of any public 
utilities made necessary by the work; hold the United 
States free from damages; provide assurances that 
encroachment on improved channels and pond areas 
will not be permitted; maintain and operate works 
after completion; and contribute in cash toward 
Federal first cost of construction an amount currently 
estimated at $752,000. Conditions are being complied 
with. 
Operations and results during fiscal year. Engineering, 
design, supervision, and administration cost $20,528. 
Of these funds, $18,846 was Federal and $1,682 non- 
Federal. 
346

MOBILE, ALA., DISTRICT 
Condition at end of fiscal year. Construction began in 
July 1964 and all contract work was completed during 
fiscal year 1968. Work remaining to be done consists of 
repairs by hired labor to right bank of Pearl River. 
Work on Prairie Branch Canal bank protection was 
completed in October 1968. 
36. LAKE DOUGLAS, DECATUR COUNTY, 
GA. 
Location. Bainbridge, the county seat of Decatur 
County, is located on the left bank of the Flint River, 
about 29 miles above its mouth, in southwest Georgia. 
Lake Douglas is located within the corporate limits of 
Bainbridge, about 3 miles east of Flint River. 
Existing project. The project provides for improvement 
of Lake Douglas for flood control by construction of a 
system of canals to provide an outlet for excess runoff 
from Lake Douglas and Twin Lakes to Big Slough and 
thence to the Flint River, by providing: a 45-foot-wide, 
canal about 14,720 feet long, to connect the system to 
Big Slough at thy State Highway 97 bridge; a 12-footwide 
canal about 730 feet long, from Lake Douglas and 
Twin Lakes to culverts under U. S. Highway 84; 
rectification of Big Slough channel to provide a 45-foot 
bottom width for about 1,700 feet downstream from the 
bridge, and clearing the existing channel from that 
point to the mouth. "See Table 10-B for authorizing 
legislation." 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Engineering, 
design, supervision and administration cost $1,003. 
Condition at end of fiscal year. The existing project was 
commenced on June 19, and completed on October 8, 
1968. 
37. OKATIBBEE RESERVOIR, MISS. 
Location. The project is located on Okatibbee Creek 
37.7 miles above its mouth, in Lauderdale County, 
Miss., 7 miles northwest of Meridian. 
Existing project. The authorized project provides for a 
dam and reservoir for flood control, water supply, and 
recreation. The dam consists of a compacted earthfill 
6,500 feet long with the top elevation 359 feet above 
mean sea level, or a maximum of 61 feet above 
streambed elevation with top width of 18 feet. The 
spillway which is located 1,500 feet east of the east end 
of the dam, is an unpaved free overlfow type 1,500 feet 
long with a fixed crest at elevation 359. A sluice intake 
structure near the center of the dam serves two 6.5-foot 
diameter concrete conduits. Storage allocated for water 
supply and water quality control varies seasonally from 
21,400 acre-feet to 34,347 acre-feet between a minimum 
elevation of 328 and top-of-conservation-pool 
elevation varying from 339 to 343. Storage varying 
from 46,538 acre-feet to 59,481 acre-feet between the 
top of conservation pool and elevation 352 has been 
reserved exclusively for storage of flood waters. 
Estimated cost (1970) is $9,015,200. "See Table 10-B 
for authorizing legislation." 
Local cooperation. Complied with to date. 
Operations and results during fiscalyear. New work: Land 
acquisition cost $59,081; relocations cost $179; road 
construction cost $34,239; construction of dam and 
spillway cost $9,882; buildings, grounds, and utilities 
cost $9,008; recreational facilities cost $54,316; permanent 
operating equipment cost $8,710; and engineering, 
design, supervision, and administration cost 
$33,078. 
Maintenance: Operation and maintenance cost 
$62,509; miscellaneous investigations and surveys cost 
$51,344; and engineering and design, supervision and 
administration cost $58,341. Rains in the headwater 
areas during March, 1970, resulted in pool elevation a 
maximum of 2 feet and a total impounding of 6,200 
acre-feet. Natural stages at Arundel were reduced as 
much as 1.8 feet. Due to flood control the reduction in 
flood losses is estimated at $1,100. Recreational 
attendance at the reservoir during C.Y. 1969 totaled 
647,200 recreational user days. 
Condition at end of fiscal year. Construction began in 
June 1965, and was completed in November 1968. 
38. TOMBIGBEE RIVER TRIBUTARIES, 
MISSISSIPPI AND ALABAMA 
Location. The Tombigbee River rises in extreme 
northeast Mississippi and flows southerly through 
eastern Mississippi and western Alabama, emptying 
into the Mobile River about 45 miles above its mouth 
at Mobile, Ala. Tributaries to be improved for flood 
control are all in northeast Mississippi and norhtwest 
Alabama. 
Existing project. The authorized project provides for 
improvement of 22 tributaries of the Tombigbee River 
by means of channel enlargement, channel cutoffs, and 
channel clearing and snagging. Approved estimate of 
cost (1970) for new work is $36,473,000; consisting of 
$32,300,000 Federal funds, and $4,173,000 to be 
contributed by local interests. "See Table 10-B for 
authorizing legislation." 
Local cooperation. Local interests must furnish lands 
and rights-of-way for construction; make all road, 
highway bridge, and utility changes, alterations, 
additions, and relocations necessary for the project; 
hold the United States free from damages; prevent 
future encroachments along the improved channels; 
maintain all works after completion; and contribute 
$1,473,000 in cash or equivalent work. 
Operations during fiscal year. New work: Channel 
improvements cost $101,685, and engineering, design 
supervision, and administration cost $156,000. 
Condition at end of fiscal year. Construction commenced 
in June 1965, and the overall project is about 6 percent 
complete. 
347

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
39. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Local flood-protection works for which inspection is 
performed under this heading consist of levee projects 
at West Point, Ga., on the Chattahoochee River; 
Montezuma, Ga., in the Flint River Basin; Elba and 
Geneva, Ala., in the Choctawhatchee River Basin; 
Rome, Ga., and Collinsville, Ala., in the 
Alabama-Coosa River Basin; and channel rectification 
projects on Black Creek, Gadsden, Ala., in 
the Alabama-Coosa River Basin; Old Town Creek, 
Tupelo, Miss.; Big Brown Creek, Donovan Creek, 
Twenty Mile Creek, and Mantachie Creek, Fulton, 
Miss., Stanefer and James Creeks, Miss., in the 
Tombigbee River Basin; Sowashee Creek, Meridian, 
Miss., in Chickasawhay River Basin; Jackson and East 
Jackson, Miss., in the Pearl River Basin; Clanton, Ala., 
Little Cove Creek, Glencoe, Ala., Autauga Creek, 
Prattville, Ala., Armuchee Creek, Armuchee, Ga., 
Cahaba River and Pinchgut Creek, Trussville, Ala., in 
the Alabama-Coosa River Basin; Town Creek, 
Americus, Ga., and Yellow Jacket Creek, Hogansville, 
Ga., in the Apalachicola-Chattahoochee--Flint Rivers 
Basin; and a drainage project in Jackson County, 
Florida. Projects at Rome and Montezuma, Ga., and 
Collinsville, Ala., include pumping stations. Inspections 
were made from September to December, 
1969 to determine the extent of compliance with 
approved regulations for maintenance and operation of 
several projects. Responsible local officials were advised 
of inadequacies in maintenance and operation of 
the local flood protection works under their jurisdiction 
where appropriate. Follow up for compliance of the 
deficient projects continued until February 1970. Fiscal 
year costs were $6,011. Total cost to June 30, 1970 was 
$25,079 charged to maintenance. 
40. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 10-I) 
41. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood Control activities pursuant to Section 205, Public Law 
858, 80th Congress, as amended (Preauthorization). 
(See Table 10-J) 
Emergency flood control activities-repairf,l oodf ighting, and 
rescue work (Public Law 99, 84th Congress, and antecedent 
legislation, and disaster relief activities under Public Law 875.) 
(See Table 10-J) 
MULTIPLE PURPOSE PROJECTS 
INCLUDING POWER 
42. ALABAMA--COOSA RIVERS, ALA. 
AND GA. 
Location. Alabama River is formed 18 miles above 
Montgomery, Ala., by the junction of the Coosa and 
Tallapoosa Rivers. It then flows southwesterly through 
Alabama 318 miles, and unites with the Tombigbee 
River about 45 miles north of Mobile, in southwestern 
Alabama, to form the Mobile River. (See Geological 
Survey maps for central and southwest Alabama.) The 
Coosa River is formed at Rome, Ga., in northwest 
Georgia, by the junction of the Oostanaula and 
Etowah Rivers, which have their sources in southeastern 
Tennessee and northern Georgia. From Rome 
the Coosa River flows southwesterly through Georgia 
and Alabama 286 miles, and unites with the Tallapoosa 
River near Montgomery, Ala., at about the 
center of the State, to form the Alabama River. (See 
Geological Survey maps for northeast Alabama, 
southeast Tennessee, and northwest Georgia.) 
Previous projects. Projects for Alabama River: For 
details see page 1837, Annual Report for 1915; page 
725, Annual Report for 1938; and page 592, Annual 
Report for 1944. Projects for Coosa River: For details 
see page 1837, Annual Report for 1915; page 728, 
Annual Report for 1938; and page 594, Annual Report 
for 1944. 
Existing project. The authorized project provides for 
full development of the Alabama-Coosa Rivers and 
tributaries for navigation, flood control, power, recreation, 
and other purposes, in accordance with plans 
under preparation by Chief of Engineers, subject to 
modifications thereof which may be advisable for 
increasing development of hydroelectric power. "See 
Table 10-B for authorizing legislation." Public Law 
436, 83d Congress, suspended authorization of the 
comprehensive plan, insofar as it provides for development 
of Coosa River, to permit non-Federal 
interests to develop the Coosa River by construction of 
a series of dams in accordance with conditions of a 
license issued pursuant to Federal Power Act and in 
accordance with certain other provisions and requirements 
of the aforementioned public law. The 
present phase of improvement, now under construction, 
provides for construction of Jones Bluff and 
Millers Ferry multiple-purpose improvements, Claiborne 
lock and dam, and supplemental channel work 
providing for a 9-foot deep navigation channel from 
the mouth of the Alabama River to Montgomery, Ala., 
and for construction of Carters Dam, a multiplepurpose 
improvement on Coosawattee River, Ga. 
Estimated cost 1970 for new work on Alabama-Coosa 
Rivers is $255,955,800 consisting of $252,035,800, for 
structures, and $3,920,000 for supplemental channel 
improvemtnts, exclusive of amounts expended on 
previous projects. 
348

MOBILE, ALA., DISTRICT 
Local cooperation. Requirements of local cooperation 
will be determined as formulation of plans for 
development of projects progress. No action in the 
matter of local cooperation has been initiated. 
Terminal facilities. On the east bank of the river a 
natural landing connects with city streets at Montgomery. 
Wofford Oil Company has a small wharf 
about 10 miles below Montgomery equipped for 
handling petroleum products. There are also various 
natural landings along the river. Facilities and natural 
landings on Alabama River are considered adequate 
for existing commerce. 
Operations and results during fiscal year. New work: 
Construction continued on Carters Dam, Millers Ferry 
lock and dam, Claiborne lock and dam, and Jones 
Bluff lock and dam. Acquisition of land was continued 
on the Alabama River channel at a cost of $589. 
Engineering, design, supervision, and administration 
cost $52,798. 
Maintenance: Operation and care of Claiborne lock 
cost $29,316, and maintenance of Claiborne lock 
amounted to $867. The U. S. pipeline dredge Collins, 
worked a total of 81 1/3 days removing 887,096 cubic 
yards of material from the Alabama River, at a cost of 
$275,205. The U. S. snagboat Toro performed snagging 
in the Alabama River, a total of 6 days at a cost of 
$5,160. Miscellaneous surveys and investigations cost 
$44,622; and engineering, design, supervision, and 
administration cost $46,866. Reconnaissance and 
condition surveys cost $288. Coosa River reservoirs cost 
$18,575. Total fiscal year costs for entire project, 
including lock and dam projects, amounted to 
$23,331,673 for new work and $775,902 for maintenance. 
Detailed information on operations and costs 
applicable to the four structures is presented under 
their respective project titles elsewhere in this report. 
Condition at end offiscalyear. Construction was initiated 
on Carters Dam in April 1962, on Millers Ferry lock 
and dam in April 1963, Claiborne lock and dam in 
May 1965, and Jones Bluff lock and dam in March 
1966. Maintenance operations on the Alabama River, 
since authorization of the existing project, have been 
limited mainly to periodic dredging to restore a 4-foot 
open-channel depth from the mouth of the river to 
Wetumpka as provided for under previous projects. 
Maintenance operations on the Coosa River, which 
were discontinued in 1950, consisted mainly of the care 
of Government property at locks and dams constructed 
under previous projects. These locks and dams have 
been inoperative for some years and no longer serve 
any useful purpose. Inspections of the lower Alabama 
River in 1955 indicated a controlling depth of 4 feet 
from the mouth to Claiborne. Boats drawing 3 feet can 
usually operate all year; however greater depths are 
usually available from November to June. Since all 
existing locks on the river are inoperative, through 
navigation on the Coosa River is impossible. (See 
Table 10-K for developments proposed under existing 
451-584 0-72-23 
project and 10-L or fiscal year costs for new work on 
overall project.) 
42A. ALLATOONA RESERVOIR, COOSA 
RIVER BASIN, GA. 
Location. The project is on Etowah River in Bartow 
County, Ga., about 48 miles upstream from Rome, Ga., 
about 5 miles due east of Cartersville, Ga., and about 
2,000 feet downstream from mouth of Allatoona Creek. 
The reservoir extends about 28 miles up the Etowah 
River at maximum power-pool elevation of 840 feet 
above mean sea level. 
Existing project. The authorized project provides for a 
dam and reservoir for flood control, regulation of 
streamflow for navigation, and development of hydroelectric 
power. Height above the river bottom of the 
concrete gravity-type dam is about 190 feet, from 
elevation 690 feet to 880 feet above mean sea level. The 
spillway, with crest at elevation 835, is controlled by 
nine tainter gates, 40 feet wide by 25 feet high, and two 
tainter gates 20 feet wide by 25 feet high; having a 
combined discharge capacity of 318,000 cubic feet per 
second with the water surface at elevation 870.1. One 
48-inch diameter sluicing conduit with a free discharge 
valve, and four sluices, 5 feet 8 inches wide by 10 feet 
high, are included in dam. Installed generating 
capacity consists of two 36,000 kilowatt units and one 
2,000 kilowatt unit, or a total of 74,000 kilowatts. 
Ultimate installed capacity will be 110,000 kilowatts. 
The reservoir, covering 19,200 acres at elevation 860, 
has a storage capacity of 671,000 acre-feet. Cost was 
$31,425,000, excluding an estimated (1970) $1,299,400 
for addition of recreation facilities at the completed 
project (Code 710 funds). "See Table 10-B for 
authorizing legislation." 
Local cooperation. None required (Sec. 2, Flood 
Control Act of June 28, 1938, applies). 
Operations and results during fiscal year. New work: 
Recreation facilities (Code 710) provided cost $9,359 
(including $7,402 Five-year program funds). 
Maintenance: Operation and ordinary maintenance 
of dam, reservoir, powerhouse, service and recreational 
activities, and administration incidental thereto cost 
$689,709. Gross power generation at Allatoona Reservoir 
was 123,190,600 kilowatt-hours, of which 
119,038,000 kilowatt-hours were delivered to Southeastern 
Power Administration. Recreational attendance 
at Allatoona Lake during CY 1969 totaled 
6,242,300 recreational user days. Rains in headwater 
areas during March, 1970 resulted in rises in pool 
elevation a maximum of 7.61 feet and a total 
impoundment of 79,800 acre-feet. Natural stages at 
Kingston were reduced as much as 6.4 feet during this 
time, with corresponding reductions in flood losses 
estimated at $119,200 rural. 
Condition at end of fiscal year. Construction of the 
existing project began in March 1944, was completed 
in October 1955. 
49

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
42B. CARTERS DAM AND RESERVOIR, GA. 
Location. The damsite is in Murray County, Ga., on 
the Coosawattee River 26.8 miles above its junction 
with Conasauga River, one of headwater tributaries of 
the Alabama-Coosa system. It is 60 miles north of 
Atlanta near the town of Carters, Georgia. The 
reservoir will be in both Murray and Gilmer Counties. 
Existing project. The authorized project consists of a 
1,950-foot long rockfill dam across the river, three 
saddle dikes on the left bank, a 258-foot-long highlevel, 
gated spillway on the left bank, a powerhouse on 
the right bank having two conventional units with a 
generating capacity of 125,000 kilowatts each and two 
pump-generating units of the same size, and a 
regulating dam 2,855 feet long with a gated spillway 
208 feet long 1.8 miles downstream from the main dam. 
The lake will have an area of 3,220 acres, at maximum 
power pool elevation 1,072, total capacity of 472,800 
acre-feet, of which 193,600 acre-feet will be usable for 
power and 95,700 acre-feet reserved for flood control 
and 183,500 acre-feet dead storage. For cost estimates 
and other information see Alabama-Coosa project. 
Operations and results during fiscal year. New work 
performed under contract: Relocations $3,818; construction 
of dam $3,281,170; power plant $1,019,103; 
and reservoir clearing cost $3. New work performed 
with hired labor: Land acquisition $158,821; engineering, 
design, and supervision and administration 
$1,393,229 and construction facilities and miscellaneous 
-$13,179. 
Condition at end of fiscal year. Construction commenced 
in April 1962, and is scheduled for completion in 1975. 
42C. CLAIBORNE LOCK AND DAM, ALA. 
Location. The site is in Monroe County at mile 81.8 on 
the Alabama River, 15 miles northwest of Monroeville 
and 5.7 miles upstream from the U. S. Highway 84 
bridge. 
Existing project. The authorized project consists of a 
short earth dike on the right bank, a combination of a 
fixed-crest and gated spillway extending across the 
river channel and into the left bank, a navigation lock 
and mound on the left bank, and an earth dike 
extending across the left overbank to high ground. 
Normal upper pool will be at elevation 35 and the 
minimum pool will be at elevation 32 to provide 
storage for reregulation of Millers Ferry powerplant 
releases. The 60-mile-long reservoir will have an area 
of 5,850 acres and a volume of 96,500 acre-feet. For cost 
estimates and other information see description of 
Alabama-Coosa project. 
Operations and results during fiscal year. New work 
performed under contract: Clearing of reservoir 
$333,819; construction of dam $1,929,207; construction 
of lock $1,760,609; approach channels 
$163,476; buildings, grounds, and utilities cost 
$38,466; and permanent operating equipment $9,461. 
New work performed with hired labor: Land acquisition 
$6,442; engineering and design, supervision 
and administration $307,427; advance travel -$200, 
construction facilities cost $6,326; and buildings, 
grounds, and utilities cost $9,719. 
Condition at end of fiscal year. Construction began in 
May 1965 and is scheduled for completion in 1972. 
42D. JONES BLUFF LOCK AND DAM, ALA. 
Location. The site is in Lowndes and Autauga 
Counties at mile 245.4 on the Alabama River, 26 miles 
west of Montgomery. 
Existing project. The authorized project provides for a 
navigation lock, a gated spillway and a power plant 
located at mile 245.4. The normal upper pool will be at 
elevation 125.0 and the minimum lower pool due to the 
Millers Ferry Lock and Dam at elevation 80.0. The 
structures will consist of earth dikes and a power plant 
on the right bank, a gated spillway in the river channel, 
a lock and mound on the left bank, and an earth dike 
extending upstream parallel to the Western Railway of 
Alabama. The total length of the structures will be 
about 14,962 feet with maximum height above the 
foundation at the power plant intake about 101 feet. 
The power plant will contain four 17,000-kw. units. 
The 88-mile long reservoir will have an area of 12,300 
acres at normal pool level and a total capacity of 
247,000 acre-feet. The lock will have a chamber 84 feet 
wide and 600 feet long and will provide a 13-foot depth 
over the lower miter sill. For cost estimates and other 
information see description of Alabama--Coosa project. 
Operations and results during fiscal year. New work 
performed under contract: Relocations $172,662; 
construction of dam $2,326,999; construction of lock 
$4,983,020; power plant $22,395; access roads 
$148,587; approach channels $571,522; buildings, 
grounds, and utilities $143; and reservoir clearing cost 
$277,242. New work performed with hired labor: 
Acquisition of lands $1,454,706; construction facilities 
$7,487; surveys and layouts $2,053; engineering, 
design, supervision and administration $834,086; and 
advance travel -$500. 
Condition at end of fiscal year. Construction began in 
March 1966 and is scheduled for completion in 1975. 
42E. MILLERS FERRY LOCK AND DAM, 
ALABAMA 
Location. The site is in Wilcox County at mile 142.2 
on the Alabama River, 10 miles northwest of Camden, 
Ala., and 30 miles southwest of Selma. 
Existing project. The project consists of an earth dike 
on the right bank, a concrete-gravity gated spillway in 
the river channel, a lock and mound on the left bank, 
an earth dike extending downstream, parallel to the 
lock, to the powerhouse intake section, and an earth 
dike extending normal to the river. Normal upper pool 
350

MOBILE, ALA., DISTRICT 
will be at elevation 80. The powerplant will contain 
three 25,000 kilowatt units. The 103-mile-long reservoir 
will have an area of 17,200 acres at normal pool 
level and a total capacity of 331,800 acre-feet. The lock 
will have chamber dimensions of 84 by 600 feet with 13 
foot depth over the miter sills. For cost estimates and 
other information see description of Alabama-Coosa 
project. 
Operations and results during fiscal year. New work 
performed under contract: Clearing of reservoir 
$42,236; construction of dam -$10,747; construction 
of lock $15,685; power plant $1,212,797; access roads 
$46,918; approach channels $140,345; permanent 
operating equipment $63,390; buildings and grounds, 
and utilities $86,208. New work performed with hired 
labor: Construction facilities -$39,413. Seepage 
investigations cost $43,687; boundary line survey cost 
$1,436; removal of coffer dam cost $117,648; acquisition 
of land $66,369; engineering, design, supervision 
and administration $283,501. Operation and 
maintenance during construction cost $107. Maintenance: 
Operation and maintenance of lock, dam, 
power house, reservoir and administration incidentals 
thereto cost $355,003. Gross power generators at 
project was 67,143,000 kilowatt-hours, of which 
66,719,000 kilowatt-hours were delivered to Southeastern 
Power Administration. 
Condition at end of fiscal year. Construction began in 
April 1963. The lock was placed in temporary 
operation in June 1968. The overall project is scheduled 
for completion in 1973. 
43. APALACHICOLA, CHATTAHOOCHEE, 
AND FLINT RIVERS, ALA., GA., AND 
FLA. 
Location. The Apalachicola River is formed at the 
southwest corner of the State of Georgia by the junction 
of the Chattahoochee and Flint Rivers and flows south 
108 miles emptying into Apalachicola Bay. Florida 
River enters the Apalachicola River from the east at 
mile 45.4 and the River Styx also enters from the east at 
mile 36.7, and Chipola River enters from the west at 
mile 28.2. (See Coast and Geodetic Survey Chart 
1262.) The Chattahoochee River, 418 miles long, rises 
in northeast Georgia and flows southwesterly to West 
Point, and thence southerly to join the Flint River at 
the southwest corner of Georgia, forming the Apalachicola 
River. (See Geological Survey maps for 
northwest Georgia.) The Flint River, 330 miles long, 
rises in west central Georgia, flows generally southeasterly 
to Albany, and thence southwest to the 
southwest corner of the State, where it joins the 
Chattahoochee River to form the Apalachicola River. 
(See Geological Survey maps for southwest Georgia.) 
Previous projects. For details, see page 484 of Annual 
Report for 1963. 
Existing project. The authorized project provides for 
development of the Apalachicola, Chattahoochee, and 
Flint Rivers for navigation, flood control, hydropower, 
and recreation. Navigation features of the existing 
project consist of a continuous 9-foot by 200-foot 
channel in the Apalachicola River from the intersection 
of the Gulf Intracoastal Waterway to the 
confluence of the Chattahoochee and Flint Rivers, 104 
miles, thence to Columbus, Ga., on the Chattahoochee 
River, 164 miles, and to Bainbridge, Ga., on the Flint 
River, 29 miles, and a 3-foot by 100-foot channel on the 
Flint River from Bainbridge to Albany, Ga., 74 miles, 
thence a channel suitable for light draft vessels at 
moderate states to Montezuma, Ga., 79 miles, to be 
accomplished by dredging, contraction works, and 
construction of three locks and dams (Jim Woodruff, 
Columbia, and Walter F. George) along the 9-foot 
depth channel, two multipurpose dams (West Point 
and Buford) on the Chattahoochee River, three 
multipurpose dams (Lower Auchumpkee Creek, Lazer 
Creek, and Spewrell Bluff) on the Flint River, and 
minor improvements of certain streams tributary to the 
Apalachicola River. Plane of reference is mean low 
water. Hydropower and flood control storage is 
provided at Buford, Lazer Creek, Lower Auchumpkee 
Creek, and Spewrell Bluff, Walter F. George and West 
Point and hydropower is provided at Jim Woodruff. 
For further details see Annual Report for 1962. "See 
Table 10-B for authorizing legislation." 
Estimated cost 1970 for new work is $465,945,000, 
including $4,480,000 for channel improvement in the 
Apalachicola River, and $338,198 for cost of lands for 
wildlife at the Walter F. George project, and exclusive 
of amounts expended on previous projects. Additionally, 
the costs of adding recreational facilities at 
completed projects (Code 710) is estimated at 
$3,155,000 for Buford Dam, $794,700 for Walter F. 
George lock and dam, $553,300 for Columbia lock and 
dam, and $1,970,000 for Jim Woodruff lock and dam. 
Mean range of tide at the mouth of Apalachicola River 
is 1.5 feet. At the point where the river is formed the 
variation between low and high water is about 37 feet. 
On the Chattahoochee River, variation between 
average low and high water is about 20 feet, and 
extreme fluctuation is 65.3 feet at Eufaula. On the Flint 
River the extreme fluctuation of stage due to flood is 40 
feet, while average variation between low and high 
water is about 21.5 feet. 
Local cooperation. Fully complied with to date. 
Terminal facilities. About 200 feet of public docks, in 
addition to private wharves, are available at Apalachicola, 
Florida. There are numerous constructed 
and natural landings along the entire system for 
launching small craft. For details of other terminal 
facilities, which are considered adequate for existing 
commerce, see individual project descriptions. See also 
Table 10-N on locks and dams and multiple-purpose 
development included in existing project. 
Operations and results during fiscal year. New work: 
Advance engineering and design on Spewrell Bluff 
Dam cost $30,044 and on Lazer Creek Dam, $125,770. 
351

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Construction on the dike system on the Apalachicola 
River between river miles 91.7 and 101.8 cost $526,094. 
Engineering, design, supervision and administration 
cost $54,234. 
Maintenance: The U. S. pipeline dredge Guthrie, 
operating 204 days with hired labor, removed 
1,197,489 cubic yards of material and the U. S. 
dragline No. 2, operating 39 days, removed 31,790 
cubic yards of material from Apalachicola and 
Chattahoochee Rivers at a cost of $456,362. The U. S. 
snagboat Montgomery, operating 189 days with hired 
labor, removed obstructions at a cost of $224,757. 
Miscellaneous investigations and surveys cost $93,058. 
Engineering, design, supervision, and administration 
cost $180,936. Operation and ordinary care of locks 
cost $74,210. Maintenance of locks cost $98,028. 
Detailed information on operations and costs applicable 
to the structures is presented under their 
respective project titles elsewhere in this report. 
Operations and maintenance of locks and dams. Walter F. 
George lock and dam cost $1,817,204. Jim Woodruff 
lock and dam cost $891,131. Buford Dam cost 
$992,599. (Columbia lock and dam costs are included 
in the costs of the river system.) 
Condition at end of fiscal year. Improvement of Apalachicola 
River channel, by dredging, to provide 
project dimensions throughout is complete. All major 
construction on Buford Dam, Columbia lock and dam, 
Jim Woodruff lock and dam, and Walter F. George 
lock and dam, is complete. Planning is-in progress on 
Spewrell Bluff, and Lazer Creek Dams. Phases I and II 
of channel rectification in Apalachicola River completed. 
Work under remaining contracts, Phase III, 
(dike work) initiated May 21, 1970. More detailed 
information concerning condition at end of fiscal year 
of individual locks and dams and multiple purpose 
developments comprising the system is presented under 
their respective project titles elsewhere in this report. 
Work remaining to complete the project consists of dike 
work for channel rectification in the Apalachicola 
River; minor land acquisition at Buford Dam and 
Columbia lock and dam; completion of recreational 
facilities (Code 710) at Buford dam, Columbia lock 
and dam, Jim Woodruff lock and dam, and Walter F. 
George lock and dam; construction of Lazer Creek, 
Spewrell Bluff and Lower Auchumpkee Creek Dam; 
and completion of construction of West Point Dam. 
(See Table 10-K for fiscal year costs for new work on 
overall project.) 
43A. BUFORD DAM AND RESERVOIR, GA. 
Location. The dam is on the Chattahoochee River 
about 348.9 miles above its mouth. 50 miles above 
Atlanta, and 5 miles northwest of Buford, Georgia. The 
reservoir extends about 47 miles upstream along the 
Chattahoochee River, and about 21 miles up the 
Chestatee River, which enters the Chattahoochee 
River 14.5 miles above the dam. 
Existing project. The authorized project provides for a 
rolled-earthfill dam 1,630 feet long, with crest at 
elevation 1,106 feet mean sea level, or about 192 feet 
above streambed elevation; three earth saddle dikes 
with a total length of 5,406 feet; a chute spillway with 
crest at elevation 1,085; a powerhouse in a deep cut 
with steel penstocks in tunnels, and concrete intake 
structure at upstream end of tunnels; and a flood 
control sluice tunnel paralleling the power tunnels. 
The underlying foundation is rock. The reservoir has a 
gross capacity of 2,554,000 acre-feet of which 637,000 
acre-feet of storage is reserved for flood control storage 
and 1,917,000 acre-feet of storage will be used for 
generating hydroelectric power, with normal pool 
elevation at 1,070. The power installations consist of 
one generating unit of 6,000 kilowatts, and two units of 
40,000 kilowatts each, or a total of 86,000 kilowatts. 
The project provides for maintenance, including 
operations and care. Approved estimated 1970 cost for 
new work is $44,800,000, of which $24,644,000 is for 
construction and design, and $20,156,000 for lands, 
damages, and relocations. Estimated cost of adding 
recreational facilities at completed project is 
$3,155,900. "See Table 10-B for authorizing legislation." 
Local cooperation. None required. 
Operations and results during fiscal year. New work: 
Construction of recreational facilities at the completed 
project (Code 710) cost $208,632. 
Maintenance: Operation and maintenance cost 
$992,599. Gross power generation at project was 
164,715,300 kilowatt-hours, of which 157,485,000 
kilowatt-hours were delivered to Southeastern Power 
Administration. Recreational attendance at Buford 
Reservoir (Lake Sidney Lanier) during CY 1969 
totaled 10,954,000 recreational user days. Rains in 
headwater area during August 1969 and March 1970 
resulted in rises in pool elevation a maximum of 1.7 feet 
and a total impoundment of 60,300 acre-feet. Natural 
stages at Norcross, Ga., were reduced 11.7 feet in 
August 1969, 6.4 feet in March 1970, with corresponding 
reductions in flood losses estimated at 
$550,400 rural. 
Condition at end of fiscal year. Construction commenced 
in March 1950, and was completed in June 1960. The 
reservoir was in useful operation for flood control in 
February 1956. The first power generating unit was 
placed on-the-line on June 19, 1957, the second on July 
26, 1957, and the third, on October 10, 1957. Work 
remaining consists mainly of construction of recreational 
facilities under Code 710. 
43B. COLUMBIA LOCK AND DAM, ALA. 
AND GA. 
Location. The project is on the Chattahoochee River 
about 46.5 miles above its mouth and about 1 mile 
below town of Columbia, Alabama, (See Geological 
Survey maps for southeast Alabama.), near the head of 
352

MOBILE, ALA., DISTRICT 
Jim Woodruff Reservoir The pool will extend the 
navigation channel about 28 miles upstream to Walter 
F. George lock and dam. 
Existing project. This single-purpose project provides 
for a concrete fixed-crest spillway 340 feet long 
extending into the right bank with a crest at elevation 
102 feet mean sea level, a concrete gate spillway 
adjacent to the lock 280 feet long with crest at elevation 
82 feet mean sea level, a single-lift lock with a usuable 
chamber dimensions of 82 by 450 feet, and a maximum 
lift of 25 feet. Depths will be 13 feet over the lower sill 
and 19 feet over the upper sill at normal pool elevation. 
The underlying foundation is limestone. Approved 
estimated (1970) cost for new work is $13,352,300 of 
which $12,956,100 is for construction, and $396,200 for 
lands, damages, and relocations. Additionally, estimated 
cost of adding recreational facilities at completed 
project (Code 710) is $553,300. The project 
provides for maintenance, including operation and 
care. The House Committee on Public Works by 
resolution adopted May 19, 1953, approved the plan as 
proposed by the Chief of Engineers for a high dam at 
Walter F. George site and a low dam at Columbia site 
in lieu of a low dam at the Fort Benning site and a high 
dam at the upper Columbia site, construction of which 
was authorized by the 1946 River and Harbor Act as 
initiation and partial accomplishment of the plan for 
full development of the Apalachicola, Chattahoochee, 
and Flint River system. "See Table 10-B for authorizing 
legislation." 
Local cooperation. Local interests must operate all 
movable span bridges, provide suitable public terminals, 
and hold the United States free from damages. 
These conditions are being complied with. 
Terminal facilities. At Columbia, Alabama, there is a 
public wharf with concrete deck for handling general 
cargo and a bulk petroleum terminal with an unloading 
dock. Facilities are considered adequate for 
existing commerce. 
Operations and results during fiscal year. New work 
performed with hired labor: Acquisition of lands, 
$3,024 engineering, design, supervision and administration, 
$25. Construction of recreational facilities 
(Code 710) cost $63,238. Recreational attendance 
at Columbia lock and dam during CY 1969 
totaled 186,500 recreational user days. Maintenance: 
Operation, and care, maintenance, and overhead 
incidental thereto cost $151,125. 
Condition at end of fiscal year. Construction of the lock 
and dam began in March 1959 and was completed in 
November 1963. Work remaining consists of constructioni 
of recreational facilities under Code 710. 
43C. JIM WOODRUFF LOCK AND DAM, 
GA. AND FLA. 
Location. The project is located on the Apalachicola 
River 107.6 miles above its mouth, about 1,000 feet 
below confluence of the Chattahoochee and Flint 
Rivers, and 1.5 miles northwest of Chattahoochee, 
Florida. Reservoir extends about 52 miles upstream 
along the Chattahoochee River to the vicinity of 
Columbia, Ala., and about 47 miles upstream along 
Flint River, or 17 miles above Bainbridge, Georgia. 
(See Geological Survey maps for southwest Georgia.) 
Existing project. The authorized project provides for a 
concrete open-crest spillway 1,634 feet long on the right 
bank, with a crest at elevation 79 feet mean sea level; a 
single-lift lock with usuable chamber dimensions of 82 
by 450 feet, a maximum lift of 33 feet, and depth over 
the sills of 14 feet; a gated spillway 766 feet long with 
the bridge at elevation 107 feet mean sea level, or about 
67 feet above the streambed elevation; a powerhouse 
with an intake section constituting a portion of the 
dam; an earth section 506 feet long to accommodate 
the switchyard and substation; and an overflow dike 
section 2,130 feet long on the left bank, with a crest at 
elevation 85. The underlying foundation is limestone. 
At the normal pool elevation of 77, the reservoir will 
have a total capacity of 406,160 acre-feet. The lower 
installation consists of three units of 10,000 kilowatts 
each, or a total of 30,000 kilowatts. Project provides for 
maintenance, including operation and care. Estimated 
cost of adding recreational facilities at the completed 
project is $1,970,900. "See Table 10-B for authorizing 
legislation." 
Local cooperation. Required cooperation is being 
fulfilled. Easements for rights-of-way and spoil-disposal 
areas were provided as required along the Apalachicola 
River. Adequate public terminals were 
constructed by local interests at Bainbridge, Ga., on the 
Flint River, and at Columbia Ala., on the Chattahoochee 
River. Facilities are being planned for other 
localities on the project. 
Terminal facilities. A public wharf with concrete deck 
for handling general cargo, a bulk storage terminal for 
petroleum, a grain elevator, and private riverside 
facilities at Bainbridge, Ga., on the Flint River are 
considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Recreational facilities provided at completed project 
(Code 710) cost $128,742 (including $104,546 Fiveyear 
Program funds). Maintenance: operation and 
maintenance cost $891,131. Power generation at Jim 
Woodruff lock and dam was 255,673,000 kilowatthours, 
of which 250,252,000 kilowatt-hours were 
delivered to Southeastern Power Administration. 
Recreational attendance at Lake Seminole during CY 
1969 totaled 2,110,300 recreational user days. 
Condition at end of fiscal year. Construction of the lock 
was commenced in 1947, and completed in 1957. The 
lock was opened to navigation in May 1954, and the 
pool was raised to project level in January 1957. The 
first power-generating unit was placed on-the-line on 
February 1, the second, on March 1, and the third, on 
April 26, 1957. 
353

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
43D. LAZER CREEK DAM AND 
RESERVOIR, GA. 
Location. The project is located at mile 255.7 on the 
Flint River just below the mouth of Lazer Creek about 
8 miles southwest of Thomaston, Ga., in Talbot and 
Upson Counties. The reservoir, at maximum power 
pool, will extend 7.7 miles upstream to the Spewrell 
Bluff Dam. 
Existing project. The authorized project provides for; a 
dam 3,420 feet long with a top elevation of 556.5 mean 
sea level and a maximum height of 142 feet, a gated 
spillway 584 feet long with a concrete nonoverflow 
abutments across the main channel to be connected to 
high ground on the left bank of an earthfill dike 670 
feet long and on the right bank by a dike 1,450 feet 
long, and a powerplant in the left bank containing two 
43,500-kilowatt units. The spillway crest will be at 
elevation 520. The reservoir at maximum power pool 
elevation 543 will have an area of 9,640 acres. At full 
power pool the reservoir will have a total capacity of 
84,050 acre-feet between elevations 533 and 543 which 
will be used for power operations and 40,560 acre-feet 
above elevation 543 reserved for flood control. Approved 
estimated 1970 cost is $52,600,000 of which 
$44,460,000 is for construction and design, and 
$8,140,000 for lands, damages, and relocations. See 
Table 10-B for authorizing legislation. 
Local cooperation. Local interests must maintain and 
operate all utility and highway facilities which may be 
relocated or otherwise altered as part of the improvement, 
provide suitable public terminal facilities, 
hold the United States free from damages, and agree to 
prevent encroachment on downstream channels that 
would interfere with the efficient operation of the 
proposed upstream reservoirs. Local agencies and 
organizations have indicated their willingness and 
ability to comply. 
Operations and results during fiscal year. Advance 
engineering and design cost $125,770. 
Condition at end of fiscal year. Construction has not been 
initiated. 
43E. LOWER AUCHUMPKEE CREEK DAM 
AND RESERVOIR, GA. 
Location. The project is located just below the mouth 
of Auchumpkee Creek, about 10 miles southwest of the 
town of Roberta and 18 miles southeast of Thomaston, 
Ga., in Taylor and Crawford Counties. The reservoir 
will extend 22.3 miles upstream to the Lazer Creek 
Dam. 
Existing project. The authorized project provides for: 
A dam 4,920 feet long with a maximum height of 130 
feet, a gated spillway 392 feet long with a nonoverflow 
abutment connected to high ground by an earthfill 
dike 3,400 feet long on the left bank and a dike 500 feet 
long on the right bank, and two 40,500-kilowatt units 
in a powerplant in the right abutment. The top of the 
dam would be at elevation 447 m.s.l. and the spillway 
crest would be at elevation 397. The reservoir, at 
maximum power pool elevation 417, will have an area 
of 15,600 acres and a total capacity of 403,000 acre-feet 
of which 135,000 acre-feet between elevation 407 and 
417 would be used for power operations. About 145,000 
acre-feet of storage between elevations 417 and 425 will 
be provided for flood control storage. Approved 
estimated (1970) cost is $65,700,000 which $49,540,000 
is for construction and design, and $16,160,000 for 
lands, damages, and relocations. "See Table 10-B for 
authorizing legislation." 
Local cooperation. Local interests must maintain and 
operate all utility and highway facilities which may be 
relocated or otherwise altered as part of the improvement, 
provide suitable public terminal facilities, 
hold the United States free from damages, and agree to 
prevent encroachment on downstream channels that 
would interfere with the efficient operation of proposed 
upstream reservoirs. Local agencies and organizations 
have indicated their willingness and ability to comply. 
Operations and results during fiscalyear. None. 
Condition at end offiscalyear. No work has been done on 
the project. 
43F. SPEWRELL BLUFF DAM AND 
RESERVOIR, GA. 
Location. The dam is on the Flint River in Talbot and 
Upson Counties, Ga., about 9 miles west of Thomaston. 
The lake will extend into Meriwether, Pike, and 
Spalding Counties. 
Existing project. The authorized project provides for: 
A dam 2,475 feet long with maximum height of 211.0 
feet, a 326 foot long gated spillway with 6 tainter gates 
38 feet high and 45 feet wide, concrete non-overflow 
abutments 1,149 feet across the main channel including 
268 feet for the power intake, with an earthrock 
fill dike 580 feet long to high ground on the left 
bank, a 420 foot saddle dike on the left bank and a 
power plant with 3 50,000-kw units located in the left 
bank. The reservoir would have an area of 13,330 acres 
at maximum power pool elevation of 695 mean sea 
level. Usuable storage of 241,510 acre-feet would be 
provided for power generation between elevations 665 
and 695 and 195,010 acre-feet would be reserved 
between elevations 695 and 706.5 for flood storage. 
Approved estimated (1970) cost is $98,000,000, of 
which $68,060,000 is for construction and design, and 
$29,940,000 for lands, damages, and relocations. "See 
Table 10-B for authorizing legislation." 
Local cooperation. Local interests must maintain and 
operate all utility and highway facilities which may be 
relocated or otherwise altered as part of improvement, 
provide suitable public terminal facilities, and hold the 
United States free from damages. Local agencies and 
organizations have indicated their willingness and 
ability to comply. 
354

MOBILE, ALA., DISTRICT 
Operations and results during fiscal year. Advance 
engineering and design cost $30,044. 
Condition at end of fiscal year. Construction has not been 
initiated. 
43G. WALTER F. GEORGE LOCK AND 
DAM, ALA. AND GA. 
Location. the project is on the Chattahoochee River 
about 75.2 miles above its mouth and about 1.5 miles 
above Fort Gaines, Georgia. (See Geological Survey 
maps for southwest Georgia.) 
Existing project. The authorized project provides for a 
concrete dam, gated spillway, and single-lift lock, with 
earth embankments at either side. The non-overflow 
section of the dam includes a powerhouse and an intake 
structures. The gated spillway is 708 feet long with a 
fixed crest at elevation 163 feet mean sea level. The two 
earth embankments, of almost equal lengths, have a 
total length of 12,128 feet, with a crest elevation at 215, 
and a maximum height of about 68 feet. The 
nonoverflow section of the concrete dam is 250 feet 
long, with the deck of the powerhouse section at 
elevation 208. The lock, with usuable chamber 
dimensions of 82 by 450 feet, has a lift of 88 feet with 
the normal upper pool elevation at 190. Depths are 13 
feet over the lower sill and 18 feet over the upper sill at 
normal pool elevation. The underlying foundation is 
limestone. The total reservoir capacity will be 934,400 
acre-feet, with 244,400 acre-feet reserved for power. 
The power installation consists of four units of 32,500 
kilowatts each, or a total of 130,000 kilowatts. The 
project provides for maintenance, including operation 
and care. The approved estimated cost (1970) for new 
work is $85,694,400 of which $63,860,000 is for 
construction and design, and $21,834,400 for lands, 
damages, and relocations. Estimated cost of adding 
recreational facilities at the completed project (Code 
710) is $794,700. "See Table 10-B for authorizing 
legislation." 
Local cooperation. Local interests must maintain and 
operate all utility and highway facilities which may be 
relocated or otherwise altered as part of the improvement, 
provide suitable public terminal facilities, 
and hold the United States free from damages. Local 
agencies and other organizations have indicated their 
willingness and ability to comply. 
Terminal facilities. Public wharves at Eufaula and 
Phenix City, Ala., and Columbus, Ga., are considered 
adequate for existing commerce. 
Operations and results during fiscal year. New work 
performed under contract was: Relocations, $184,952. 
New work performed with hired labor was: Land 
acquisition, $747, and engineering, design, supervision 
and administration, $767. Recreation facilities provided 
at completed project (Code 710) cost $31,450. 
Maintenance of the project, including operation and 
care was $1,817,204. Emergency repair work on the 
lock floor system cost $498,000. Gross power generation 
at Walter F. George lock and dam was 338,448,000 
kilowatt-hours, of which 334,553,000 kilowatt-hours 
was delivered to Southeastern Power Administration. 
Recreational attendance during CY 1969 totaled 
2,871,600 recreational user days. 
Condition at end of fiscal year. Construction was 
completed in 1963. The lock was opened to navigation 
in June 1963. The first power generating unit was 
placed on-the-line in March, the second in May, the 
third in September, and the fourth in November 1963. 
43H. WEST POINT DAM AND RESERVOIR, 
CHATTAHOOCHEE RIVER BASIN, GA. 
AND ALA. 
Location. The damsite is on the Chattahoochee River 
2.8 miles upstream from West Point, Ga., 201.4 miles 
above the mouth of the Chattahoochee River, and 
309.2 miles above the mouth of the Apalachicola 
River. At the full power-pool elevation of 635 feet 
above mean sea level, the reservoir would lie in Troup 
and Heard Counties, Ga., and in Chambers and 
Randolph Counties, Alabama. (See Geological Survey 
maps of Ga. and Ala.) 
Existing project. The authorized project is to provide 
for flood control, power, recreation, fish and wildlife 
development, and streamflow regulation for downstream 
navigation. The project provides for a gravitytype 
concrete dam 896 feet long with earth embankments 
at either end 1,111 feet long east and 5,243 
feet long on the west end. The total length of the dam 
and spillway will by 7,250 feet. The main dam will 
consist of a concrete non-overflow section, 185 feet long 
on the west side and an earth embankment retaining 
wall on the east side; a gravity concrete spillway 390 
feet long, including piers and abutments, with 6 tainter 
gates, each 50 feet by 41 feet. A monolith intakepowerhouse 
section and erection bay 321 feet long will 
be constructed directly west and adjacent to the 
spillway. At the full power-pool elevation of 635 the 
reservoir will provide a total storage of 605,000 acrefeet 
of which 307,000 acre-feet will be usable. During 
the critical flood season, it is planned to operate the 
reservoir with maximum power-pool elevation at 625 
feet to provide flood storage between elevations 625 
and 635. The initial power installation will be 73,375 
kilowatts and the ultimate will be 108,375 kilowatts. 
Approved estimated cost of new work (1970) is 
$65,800,000, of which $40,722,000 is for construction 
and design, and $25,078,000 for lands, damages, and 
relocations. "See Table 10-B for authorizing legislation." 
Local cooperation. None required. 
Operations and results during fiscal year. New work: 
During fiscal year 1970 real estate acquisition was 
continued and was about 65% complete June 30, 1970. 
One road relocation contract in Troup County was 
completed and a second contract awarded June 2, 
1970; the concrete dam contract was about 99% 
355

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
complete at the end of the fiscal year, with the total cost 
to be about $6,000,000; and power plans and specifications 
were mailed to prospective bidders May 8, 
2970. Bids will be received during August and award is 
to be made during September. Manufacture of power 
plant items under existing supply contracts continued 
during the year. 
Total cost for new work during the fiscal year was 
$7,051,873 of which $2,607,400 was for lands and 
damages, $489,100 for relocations, $25,600 for reservoir, 
$2,818,400 for construction of concrete dam, 
$36,100 for power plant supply items, $1,000 for roads, 
$32,400 for buildings, grounds, and utilities, $2,200 for 
permanent operating equipment, $973,900 for engineering 
and design, $410,200 for supervision and 
administration, and $63,673 in undistributed cost. 
Condition at end of fiscal year. Construction of the 
project, which was initiated in June 1966 was about 36 
percent complete. 
44. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Mobile District monitors flood control operations of 
Alabama Power Co.'s Weiss, H. Neely Henry, and 
Logan Martin Dams on Coosa River, Ala., and their 
Lewis Smith Dam on Sipsey Fork (headwaters of Black 
Warrior River, Ala.), for compliance with regulation 
plans prepared in accordance with Public Law 436, 
83rd Congress, and Federal Power Commission licenses. 
Fiscal year cost of $18,575 for these activities are 
included under operation and maintenance costs for 
the Alabama-Coosa Rivers (Weiss, H. Neely Henry, 
and Logan Martin Dams), and The Black Warrior and 
Tombigbee Rivers (Lewis Smith Dam). Other fiscal 
year costs amounted to $10,217 for miscellaneous 
investigations on Crooked Creek, Ala., in connection 
with license application on Tallapoosa River from 
Alabama Power Co. 
GENERAL INVESTIGATIONS 
45. SURVEYS 
Fiscal year cost was $372,775 of which $151,504 was 
for navigation studies, $150,783 was for flood control 
studies, $11,649 was for beach erosion studies, $55,792 
for river basin studies, and $112 for cooperative 
watershed studies, and $2,935 was for a national 
shoreline study. 
46. COLLECTION AND STUDY OF BASIC 
DATA 
Collection and study of basic data continued during 
fiscal year in connection with flood plain information 
studies for metropolitan Atlanta, Ga. Utoy Creek, 
North and South Utoy Creeks, Gadsden, Ala. (Big 
Wills Creek) Destin, Florida, and 
Pascagoula-Gautier, Miss. (Cany Creek); metropolitan 
Birmingham (Fivemile Creek); and Tallahassee, 
Leon County, Fla. (Lake Jackson); and 
provisions of technical services at a cost of $121,261. 
(See Table 10-N on completed flood plain study.) 
47. RESEARCH AND DEVELOPMENT 
Stream measurements and stage hydrographs at 
nine stations on tributaries in the Mobile District cost 
$8,725. 
356

MOBILE, ALA., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
New Work 
1. Apalachicola Bay, 
Fla. 
Maint. 
Approp. 
Cost 
2. Aquatic Plant Control New Work: 
Approp. 
(Regular Funds) Cost 
Maint. 
(Contributed Funds) Approp. 
Cost 
3. Bayou Coden, Ala. New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
4. Bayou La Batre, Ala. New Work: 
Approp. 
(Regular Funds) Cost 
Maint. 
Approp. 
Cost 
(Contributed Funds) Contrib. 
Cost 
5. Biloxi Harbor, Miss. New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
6. Black Warrior & New Work: 
Tombigbee Rivers, Approp. 
Ala. Cost 
Maint. 
Approp. 
Cost 
7. Blackwater River, New Work: 
Fla. Approp. 
Cost 
Maint. 
Approp. 
Cost 
8. Cadet Bayou, Miss. New Work 
Approp. 
Cost 
9. Dauphin Island Bay, New Work: 
Ala. Approp. 
Cost 
Maint. 
Approp. 
Cost 
10. Dog and Fowl Rivers, New Work: 
Ala. Approp 
Cost 
55,000 
22,843 
4,000 
2,214 
14,800 
150,005 
100 
1,026 
10,500 
50,000 
1,450 
4,810,124 
4,518,317 
1,679,100 
1,788,734 
15,000 
852 
-4,700 
8,517 
77,000 
38,845 
4,673 
4,673 
10,000 
9,939 
1,981 
2,020 
2,3255 
2,3255 
23,000 
14,228 
4,000 
52,867 
4,950,168 
2,866,799 
2,046,731 
1,990,268 
2,000 
22,000 
36,371 
3,000 
55,500 
75,609 
25,400 
32,965 
6,215 
6,215 
12,000 
2,034 
110,100 
67,951 
400,000 
5,402 
76,500 
71,652 
611,000 
1,990,186 
2,535,500 
2,529,596 
600 
585 
11,000 
2,430 
29,400 
4,056 
23,000 
4,041 
52,288 
55,741 
1,000 
21,495 
3,665 
3,665 
-5,000 
2,113 
20,093 
20,093 
38,354 
49,200 
57,175 
99,105 
-360,000 
5,358 
387,431 
387,731 
1,910,555 
2,009,284 
3,016,468 
2,997,500 
341 
355 
5,000 
13,662 
32,356 
57,528 
14,355 
Approp. 
Cost 
357 
TABLE 10-A 
1'lo-w rr vi ft 
1,047,2961 
1,046,950 
1,173,5222 
1,173,5222 
107,500 
95,519 
14,553 
14,553 
22,6503 
19,736 
37,6524 
37,6524 
311,095 
311,095 
440,101 
439,879 
10,5006 
10,5006 
325,1527 
287,140 
1,247,3188 
1,247,2878,10 
106,505,24711 
105,237,48611,12 
47,743,66413 
47,595,83213 
41,65014 
41,65014 
153,655 
153,654 
18,000 
16,092 
292,565 
292,565 
181,649 
181,373 
26,000 
18,396

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 10-A (Continued) 
See 
Sect 
in T
ion 
ext Project 
11. East Pass Channel 
From Gulf of Mexico 
into Choctawhatchee 
Bay, Fla. 
(Regular Funds) 
(Contributed Funds) 
12. East Pearl River, 
Miss. 
13. Escambia and Conecuh 
Rivers, Fla. & Ala. 
14. Fly Creek, Fairhope, 
Ala. 
15. Grand Lagoon, 
Panama City, Fla. 
16. Gulf Intracoastal 
Waterway between 
Apalachee Bay, Fla. 
and Mexican Border 
17. Gulfport Harbor, 
Miss. 
18. LaGrange Bayou, 
Fla. 
19. Mobile Harbor, Ala. 
(Regular Funds) 
(Contributed Funds) 
Funding 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
150,000 
46,870 
60,000 
48,388 
55,000 
51,536 
-2,000 
9,942 
5,000 
2,580 
499,000 
504,264 
379,400 
360,576 
1,010,500 
760,393 
460,000 
532,886 
1,900 
17,177 
285,000 
247,261 
34,858 
34,858 
967 
98,500 
28,455 
297,032 
487,454 
525,200 
546,656 
5,450 
5,450 
969,500 
791,090 
12,000 
318,000 - 928,000 
323,515 13,428 916,699 
50,470 347,633 1,041,458 
50,417 138,166 831,932 
113,000 - 398,000 
137,478 7,676 392,415 
- - 37,128 
- - 37,12815 
516 44,126 223,311 
516 44,126 223,31116 
- - 208,499 
- - 208,49917 
56,700 1,031 328,08118 
56,245 1,511 324,642 
- - 29,000 
- - 29,000 
16,500 177 41,74219 
16,322 451 41,580 
- - 12,150 
84 633 11,341 
398,000 -2,262 6,480,29920,22 
465,782 - 6,480,29820,22 
733,880 1,748,979 10,037,94221 
595,517 768,231 8,909,466 
- - 904,775 
- - 904,7752 3 
610,000 1,339,377 11,935,31924 
211,674 1,323,490 11,519,30524 
- - 289,496 
- - 289,496 
- 7,068 60,8552s5 
45 7,068 60,8552s 
- - 14,488,93726 
- - 14,488,937 
993,192 1,355,257 20,464,11727 
684,483 1,447,386' 19,782,289 
- - 12,000 
12,000 - 12,000 
358

TABLE 10-A (Continued) 
MOBILE, ALA., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project Funding FY67 FY68 FY69 FY70 
20. Panama City Harbor, New Work: 
Fla. Approp. - - -1,857 - 
21. Pascagoula Harbor, 
Miss. 
22. Pass Christian 
Harbor, Miss. 
23. Pearl River, Miss. 
and La. 
24. Pensacola Harbor, 
Fla. 
25. Perdido Pass 
Channel, Ala. 
(Regular Funds) 
(Contributed Funds) 
26. Port St. Joe 
Harbor, Fla. 
27. Removing Water 
Hyacinth 
(Mobile District) 
28. Waterway Connecting 
Tombigbee and 
Tennessee Rivers, 
Ala. and Miss. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost. 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
67,076 
225,000 
220,298 
603,500 
552,327 
41,000 
3,892 
200,000 
121,929 
54,600 
52,117 
54,000 
22,263 
10,167 
5,000 
9,220 
527,700 
567,979 
30,000 
754 
146,000 
206,441 
168 
2,674 
245,000 
8,045 
24,921 - 
280,000 1,274 
280,175 1,581 
642,188 774,163 
25,033 1,406,307 
2,481 
218,400 
252,102 
435,000 
130,747 
327,000 
602,630 
245,000 265,000 
22,613 449,524 
37,000 
35,867 
30,000 
21,844 
40,000 
37,542 
250,000 
93,776 
18,325 
27,454 
460,000 
381,145 
20,630 
177,980 
25,500 
25,956 
485,000 
559,257 
30,523 
30,523 
2,472 
283,172 
158,980 
52,334 
356,587 
-21,418 
-3,078 
130,500 
52,943 
37,863 
190,558 
159,781 
12,500 
11,843 
525,000 
516,621 
Total to 
June 30, 1970 
1,348,04428,30,31 
1,348,04428,30,31 
3,064,35829 
3,064,357 
6,572,98532 
6,572,98532 
6,524,80833 
6,524,77733,34 
59,319 
59,319 
37,247 
37,247 
8,528,73735,36 
8,445,87935,36 
2,452,5953; 
2,321,851 
1,469,69338 
1,469,693 
2,294,47239 
2,294,47239 
629,860 
629,860 
130,500 
52,943 
510,000 
510,000 
1,980,86240 
1,980,86240 
1,048,835 
1,018,051 
736,693 
735,831 
2,626,3544 1 
2,583,46941 
234,33142 
234,33142 
359

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 10-A (Continued) 
See 
Section 
in Text Project 
29. Wolf and Jordan 
Rivers, Miss. 
34. Baldwin and Hannon 
Sloughs, Montgomery, 
Ala. 
35. Jackson & East 
Jackson, Miss. 
(Regular Funds) 
(Contributed Funds) 
36. Lake Douglas, 
Decatur County, Ga. 
37. Okatibbee 
Reservoir, Miss. 
38. Tombigbee River 
Tributaries, 
Miss. & Ala. 
(Regular Funds) 
(Contributed Funds) 
42. Alabama-Coosa 
Rivers, Ala. and 
Ca. 
42-A. Allatoona Reservoir 
Coosa River Basin, 
Ga. 
42-B. Carters Dam and 
Reservoir, Ga. 
42-C. Claiborne Lock and 
Dam, Ala. 
42-D. Jones Bluff Lock 
and Dam, Ala. 
42-E. Millers Ferry Lock 
and Dam, Ala. 
COST AND FINANCIAL STATEMENT 
Total to 
Funding FY67 FY68 FY69 FY70 June 30, 1970 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
17,768 
2,506,000 
1,865,736 
231,900 
197,243 
25,000 
111 
2,981,000 
2,941,254 
572,000 
412,820 
5,900 
5,900 
28,461,000 
26,419,169 
16,000 
15,975 
40,000 
41,625 
542,000 
594,519 
8,496,000 
7,968,436 
5,178,000 
4,415,208 
1,526,000 
1,174,675 
12,535,000 
12,730,309 
26,740 
26,740 
176 
5,579 
27,500 
885,702 
12,600 
73,901 
50,000 
24,576 
2,656,000 
1,937,194 
11,800 
11,259 
-18,000 
228,732 
5,600 
27,438,000 
27,255,463 
33,500 
32,991 
50,000 
26,924 
573,300 
592,394 
7,230,000 
5,694,473 
6,056,000 
7,266,569 
1,918,000 
2,454,111 
12,054,000 
11,535,578 
17,500 
16,935 
725 
725 
389 
45,000 
66,224 
6,000 
6,534 
92,100 
123,364 
90,000 
954,235 
108,500 
87,117 
500,000 
333,377 
5,600 
23,845,000 
28,238,789 
198,160 
182,782 
220,000 
96,057 
665,650 
833,340 
3,808,000 
6,007,408 
4,753,000 
5,453,653 
7,954,000 
8,069,103 
6,382,000 
7,366,127 
123,360 
108,080 
67,114 
67,114 
26,894 
5,541 
18,846 
1,682 
-18,179 
1,003 
324,200 
208,493 
160,992 
172,194 
91,000 
257,685 
23,255,200 
23,331,673 
780,971 
775,902 
-5,000 
9,359 
716,000 
698,709 
5,953,000 
5,842,965 
4,426,200 
4,564,752 
10,820,000 
10,800,402 
2,131,000 
2,070,167 
356,400 
355,003 
360 
29,19543 
29,19543 
229,227 
229,227 
63,087 
41,379 
6,960,500 
6,959,372 
718,000 
718,000 
164,998 
164,998 
8,940,175 
8,556,181 
281,292 
270,570 
1,978,925 
1,918,023 
30,700 
30,700 
153,008,65844,46,47 
151,736,72044,46,47 
4,200,72145,48 
4,179,70945,48 
32,600,31749 
32,463,67149 
7,465,376 
7,554,538 
41,377,040 
40,962,779 
24,070,200 
23,942,794 
24,116,000 
23,712,151 
56,200,950 
55,876,312 
497,260 
480,018

MOBILE, ALA., DISTRICT 
TABLE 10-A (Continued) 
See 
Section 
in Text Project 
43. Apalachicola, 
Chattahoochee, and 
Flint Rivers, Ala., 
Ga. 
43-A. Buford Dam and 
Reservoir, Ga. 
43-B. Columbia Lock and 
Dam, Ala. & Ga. 
43-C. Jim Woodruff Lock 
and Dam, Ga. & 
Fla. 
43-D. Lazer Creek Dam 
and Reservoir, Ga. 
43-F. Sprewell Bluff Dam 
and Reservoir, Ga. 
43-G. Walter F. George 
Lock and Dam, 
Ala. & Ga. 
43-H. West Point Dam and 
Reservoir- 
Chattahoochee River 
Basin 
Funding 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
7,515,076 
6,211,486 
3,221,918 
3,494,226 
176,000 
327,426 
738,000 
723,101 
76 
103,720 
56 
60,367 
79,000 
70,034 
782,800 
745,272 
260,000 
63,771 
600,000 
421,529 
1,121,000 
533,290 
775,718 
741,635 
8,166,623 
6,426,640 
3,601,900 
3,509,787 
562,552 
195,088 
814,800 
906,722 
104,134 
154,510 
56 
57,438 
95,000 
63,365 
733,700 
778,146 
150,000 
98,483 
245,000 
328,885 
910,936 
790,711 
1,283,900 
937,949 
6,319,000 
7,404,269 
4,781,090 
4,890,806 
103,500 
349,797 
923,900 
884,380 
86,000 
15,467 
56 
67,430 
209,000 
93,485 
883,160 
807,517 
252,000 
93,274 
63,334 
-6,500 
582,447 
1,972,940 
2,227,081 
6,845,200 
8,409,592 
5,279,718 
5,326,285 
34,200 
208,632 
1,008,982 
992,599 
8,330 
66,287 
56 
151,125 
68,670 
128,742 
889,620 
891,131 
-25,000 
125,770 
30,044 
35,000 
217,916 
2,246,998 
2,315,204 
4,928,000 6,000,000 5,300,000 6,399,000 
4,615,868 4,757,585 5,722,721 7,051,873 
226,561,6735 o,s 1, 2 
225,271,14950,51,52 
33,755,44653 
33,454,880 3 
47,079,15654 
47,049,45454 
6,807,566 
6,729,451 
13,050,8445s 
13,028,37555 
56 
529,542 
47,482,34757 
47,385,52457 
8,176,867 
8,088,780 
832,000 
543,080 
1,100,000 
1,061,203 
85,843,83758,59 
85,822,67058,59 
8,011,00960 
7,929,53460 
61 
25,796,70061 
25,005,686 
361

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COST AND FINANCIAL STATEMENT 
1. Includes $134,613 for previous projects. 
2. Includes $168,766 for previous projects. 
3. Includes $5,650 for previous projects. 
4. Includes $17,454 for previous projects. 
5. Reconnaissance and condition survey. 
6. Estimated cost for providing spoil dikes for work authorized 
by 1965 River and Harbor Act. 
7. Includes $44,382 for previous projects. 
8. Includes $86,309 for previous projects. 
9. Includes $5,000 contributed funds for previous projects. 
10. Includes $10,200 contributed funds for previous projects. 
11. Includes $606,931 for previous projects. 
12. Includes $462,639 for recreational facilities (Code 710) 
on completed projects, $79,220 Public Works funds, and 
$607,308 Emergency Relief funds. 
13. Includes $50,000 for previous projects. 
14. Includes $5,000 for previous projects. 
15. Includes $28,200 for previous projects. 
16. Includes $516 for condition surveys (1969). 
17. Includes $71,175 for previous projects. 
18. Includes $1,882 (1968) Condition Survey. 
19. Includes $320 (1968) Condition Survey. 
20. Includes $45,605 for previous projects. 
21. Includes $65,137 for previous projects. 
22. Includes $340,000 Emergency funds. 
23. Includes $269,017 for previous projects. 
24. Includes $2,312,297 for previous projects. 
25. Includes $2,161 for previous projects. 
26. Includes $6,683,104 for previous projects. 
27. Includes $4,096,681 for previous projects. 
28. Includes $203,560 for previous projects. 
29. Includes $513,604 for previous projects. 
30. Includes $581,959 Public Works funds. 
31. Includes $457,467 Rehabilitation of jetties under existing 
project. 
32. Includes $904,442 for previous projects. 
33. Includes $412,624 for previous projects. 
34. Includes $829,472 for emergency work following Hurricane 
Camille. 
35. Includes $144,443 for previous projects. 
36. Includes $26,942 for recreational facilities (Code 710) on 
completed projects. 
37. Includes $168,172 for previous projects. 
38. Includes $594,688 for previous projects. 
39. Includes $126,649 for previous projects. 
40. Includes $20,000 expended for contributed funds. 
41. Includes $197,651 for previous projects. 
42. Includes $234,331 for previous projects. 
43. Includes $725 for condition survey (1969). 
44. Includes $3,692,483 for previous projects. 
45. Includes $2,978,050 for previous projects. 
46. Includes $1,012,985 allotted for planning studies on 
Howell Mill Shoal Dam on Coosa River for which authorization 
has been suspended and $15,000 allotted for review of plans for 
development of Coosa River submitted by non-Federal interests 
pursuant to Public Law 436, 83rd Congress. 
47. Includes $1,012,985 applied to new work on Howell Mills 
Shoals Dam on Coosa River, and $11,109 expended during fiscal 
years 1956-57 on review plans submitted by non-Federal 
interests pursuant to Public Law 436, 83rd Congress. 
48. Includes $19,263 for care of lockmaster's house and 
other Government property at lock sites on Coosa River prior to 
1950, and $104,077 for maintenance of existing channel in 
Alabama River, (4-foot project), and $138,271 for scheduling 
flood control reservoir operations for Alabama Power Company's 
dams on Coosa River. 
49. Includes $999,991 for recreational facilities (Code 710) 
regular funds and $38,942 for recreational facilities (Code 710) 
5-year program fund. 
50. Includes $1,883,193 Federal funds and $1,924 contributed 
funds for previous projects. 
51. Includes $333,198 cost for wildlife refuge, and $122,071 
Public Works Acceleration funds for Walter F. George. 
52. Includes $3,362,305 Code 710 funds for recreational 
facilities at completed projects, $2,260,359 for Buford, 
$911,097 for Jim Woodruff, $74,018 for Columbia, and 
$116,831 for Walter F. George. 
53. Includes $2,246,233 for previous projects. 
54. Includes $2,260,359 for recreational facilities (Code 
710). 
55. Includes $74,018 for recreational facilities (Code 710). 
56. Included under maintenance appropriation for overall 
Apalachicola, Chattahoochee, and Flint Rivers project. 
57. Includes $764,475 for recreational facilities (Code 710) 
funds and $146,622 for recreational facilities (Code 710) 5-Year 
Program funds. 
58. Includes $333,198 cost for wildlife refuge and $122,071 
Public Works Acceleration funds. 
59. Includes $116,831 recreational facilities provided at 
completed projects (Code 710). 
60. Includes $498,000 Special 0. and M. expenditures under 
Code 300. 
61. Includes $975,000 advance engineering and design (Code 
100) funds. 
362 
TABLE 10-A (Continued)

MOBILE, ALA., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar 2, 1907 
Jan. 21, 1927 
Sept. 3, 1954 
Sept. 3, 1954 
July 3, 1958 
Nov. 21, 19631 
July 3, 1958 
Oct. 23, 1962 
Oct 27, 1965 
March 2, 1945 
June 2, 19691 
Oct. 27, 1965 
July 3, 1930 
June 20, 1938 
APALACHICOLA BAY, FLA. (See Section 1 of Text) 
Channel 18 feet deep through West Pass and Link Channels, 
10 feet deep across the inner bar, and 9 feet deep 
through Bulkhead Shoals. 
Modify project to provide for channel 10 feet deep from 
mouth of inner bar channel to Gulf via Link and West 
Pass Channels, and 10-foot depth in Bulkhead Shoals 
Channel. 
At Eastpoint, Fla., a channel 6 feet deep, 100 feet wide, 
and about 6,000 feet long, parallel to shore, with 
connecting channel 6 feet deep and 100 feet wide to St. 
George Sound, and at Apalachicola, Fla., a small-boat 
basin 200 by 880 feet and 9 feet deep, with a connecting 
channel 9 feet deep and 80 feet wide through Scipio 
Creek to the Apalachicola River. 
Modify project to provide for a channel 10 feet deep and 
100 feet wide from the 10-foot depth in Apalachicola 
Bay across St. George Island to within 300 feet of the 
gulf shore, thence increasing uniformly in width to 200 
feet at shore and continuing at this width to the 10-foot 
depth in the gulf, with two jetties extending from the 
dune line on St. George Island to the outer end of 
channel, and for abandonment of West Pass Channel upon 
completion of channel through St. George Island. 
Modify improvement of Apalachicola Bay, Fla., authorized 
by River and Harbor Act of Sept. 3, 1954 to provide 
that the Secretary of the Army shall reimburse local 
interests for such approved work as they may have done 
upon the projects, provided such reimbursements be 
based upon the reduction in the amount of material 
which will have to be removed to provide project 
dimensions at such time as Federal dredging of the 
channels is undertaken. 
A channel 6 feet deep, 100 feet wide and about 1 mile long, 
parallel to shore at Two Mile, Fla., with a 6-by 100-foot 
connecting channel to water of the same depth in 
Apalachicola Bay. 
AQUATIC PLANT CONTROL (See Section 2 of Text) 
Aquatic plant control for N.C., S.C., Ga., Fla., Ala., Miss., 
and La. 
Research planning costs prior to construction to be borne 
by U. S. 
Provided for continued research. 
BAYOU CODEN, ALA. (See Section 3 of Text) 
Channel 4 by 40 feet 
Channel 8 by 60 feet to connect with Bayou La Batre 
channel 
BAYOU LA BATRE, ALA. (See Section 4 of Text) 
A 12- by 100-foot channel from that depth in Mississippi 
Sound to a point about 2,800 feet south of the highway 
bridge, thence a channel 12 by 75 feet to the bridge, an 
overall distance of about 33,500 feet. 
BILOXI HARBOR, MISS. (See Section 5 of Text) 
Channel 10 feet deep and 150 feet wide from Mississippi 
Sound west and north of Deer Island to deep water in 
Back Bay of Biloxi. 
Relocation of channel 
363 
TABLE 10-B 
H. Doc. 422, 59th Cong., 1st 
sess. 
H. Doc. 106, 69th Cong., 1st 
sess. 
H. Doc. 156, 82d Cong., 1st 
sess. 
H. Doc. 557, 82d Cong., 2d 
sess. 
H. Doc. 37, 85th Cong., 1st 
sess. 
Public Law 87-874 87th Cong. 
H. Doc. 251, 89th Cong., 1st 
sess. 
H. Doc. 824, 77th Cong., 2d 
sess. 
H. Doc. 327, 88th Cong., 2d 
sess. 
H. Doc. 754, 69th Cong., 2d 
sess. 
H. Doc. 639, 75th Cong., 3d 
sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 10-B (Continued) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
Mar. 2, 1945 
Mar. 2, 1945 
May 17, 1950 
July 14, 1960 
Nov. 7, 1966 
July 5, 1884 
Mar. 3, 1899 
Sept. 19, 1890 
Sept. 19, 1890 
Mar. 2, 1907 
Mar. 3, 1909 
Aug. 22, 1911 
Mar. 2, 1919 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 30, 1935 
Entrance channel 6 feet deep and 50 feet wide into Old 
Fort Bayou. 
Entrance channel 8 feet deep and 100 feet wide through 
Cranes Neck into Bayou Bernard. 
Maintain channel 6 feet deep and 40 feet wide from Biloxi 
Harbor to Ott Bayou. 
Continuous channel 12 feet deep from Mississippi Sound to 
the Air Force terminal on Bayou Bernard via Back Bay 
and Cranes Neck. 
A 23-mile-long through channel 12 feet deep and 150 feet 
wide from the Gulf Intracoastal Waterway through: 
Mississippi Sound, Biloxi Bay (east of Deer Island) Back 
Bay, Big Lake, and via land cut to Gulfport Lake, 
including a 500- by 2,600-foot turning basin in the lake, 
thence, a channel 12 by 100 feet from the western end of 
Gulfport Lake for about 2 miles to a 300-by-500-foot 
turning basin; adoption for maintenance of a 12-by 150- 
foot spur channel from the main channel in Biloxi Bay 
westward about 1 mile to a 400- by 600-foot turning basin 
opposite Ott Bayou, and abandonment of the existing 6- by 
40-foot channel into Ott Bayou; continuation of maintenance 
of the 12-by 150-foot lateral channel westward about 2.2 
miles from the main channel in Biloxi Bay to a point 
opposite Oak Street; continuation of maintenance of the 
channel west of Deer Island. 
BLACK WARRIOR AND TOMBIGBEE RIVERS, ALA. (See Sect. 6 of Text) 
Original appropriation for improving Black Warrior River. 
Original project for slack-water improvement authorized by 
Secretary of War, Apr. 19, 1887. 
Construction of the first locks between Tuscaloosa and 
Demopolis. 
(Maintenance of the section of Tombigbee River below 
lock 1 to its mouth (66 miles) included in the existing 
project.) 
Construction of locks and dams 1,2, and 3. Merging of 
the individual project for the Black Warrior and Warrior 
Rivers and the Tombigbee River below Demopolis. 
Construction of locks and dams 14, 15, 16, and 17 
Provides for reconstruction of obsolete structures, modified 
in plan and location, to provide efficient and economical 
maintenance and operation. 
Lift of lock 17 changed to 63 feet, and construction of locks 
and dams 18 and 19 eliminated from the project. 
Extension of slack-water improvement to Sanders Ferry 
on Mulberry Fork and Nichols Shoal on Locust Fork. 
Raising of various dams 2 feet and raising the lock walls 2 
feet at lock 1 to provide a minimum depth of 8 feet at 
low water, widening the channel to 150 feet where 
practicable. 
For snagging Mobile River from the mouth of Chickasaw 
Creek to the junction of the Alabama and Tombigbee 
Rivers. 
Increase channel dimensions to 9 by 200 feet; construct 
crest gates at lock and dam 17; add flashboards at all 
dams; Sunflower Bend Cutoff. 
Construction of a lock and dam below Tuscaloosa to replace 
original locks and dams 10, 11, and 12. 
364 
Documents 
H. Doc. 258, 76th Cong., 1st 
sess. 
H. Doc. 326, 76th Cong., 1st 
sess. 
H. Doc. 256, 81st Cong., 1st 
sess. 
H. Doc. 271, 86th Cong., 2d 
sess. 
H. Doc. 513, 89th Cong., 2d 
sess. 
Annual Report, 1887, pt. 2, 
p. 1302. 
H. Doc. 178, 56th Cong., 2d 
sess., and Annual Report 
1901, pt. 3, p. 1858. 
H. Doc. 165, 57th Cong., 1st 
sess., and Annual Report, 
1902, p. 1293. 
Public Law 317. 
H. Doc. 72, 62d Cong., 1st 
sess. 
Annual Report, 1918, p. 876. 
H. Doc. 728, 71st Cong., 3d 
sess. 
H. Doc. 56, 73d Cong., 1st 
sess., and Rivers and 
Harbors Committee Doc. 45, 
73d Cong. 
Rivers and Harbors Committee 
Doc. 26, 74th Cong., 1st 
sess.

TABLE 10-B (Continued) 
MOBILE, ALA., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Operation and care of locks and dams provided for with 
funds from War Department appropriations for rivers 
and harbors. 
Recreation facilities. 
Construction of a lock and dam near Demopolis to replace 
existing dams 4, 5, 6, and 7. 
Provide increased spillway capacity at dam 1. 
Jackson lock and dam Wildlife Refuge. 
June 26, 1934 
Dec. 22, 1944 
Mar. 2, 1945 
Mar. 2, 1945 
July 14, 1960 
Mar. 3, 1905 
May 20, 1969 
March 2, 1945 
Sept. 3, 1954 
May 19, 1969' 
Oct. 24, 1951 
Oct. 27, 1965 
June 25, 1910 
July 3, 1958 
365 451-584 0-72-24 
H. Doc. 276, 76th Cong., 1st 
sess. 
H. Doc. 382, 76th Cong., 1st 
sess. 
S. Doc. 50, 86th Cong., 1st 
sess. 
H. Doc. 193, 58th Cong., 2d 
sess. 
H. Doc. 333, 76th Cong., 1st 
sess. 
H. Doc. 394, 82d Cong., 2d 
sess. 
BLACKWATER RIVER, FLA. (See Section 7 of Text) 
A 9-by 100-foot channel from mouth for 12 miles to Milton. 
CADET BAYOU, MISS. (See Section 8 of Text) 
An 8- by 100-foot entrance channel extending from the 8-foot 
depth contour in Mississippi Sound to the mouth of the bayou, 
thence an 8- by 80-foot channel for a distance of about 1,900 
feet into the bayou to a turning basin 8 feet deep, and a 
channel continuing therefrom 6 feet deep and 60 feet wide 
upstream for 8,750 feet with a second turning basin 6 feet 
deep located 900 feet downstream from the upper limit of the 
improvement. 
DAUPHIN ISLAND BAY, ALA. (See Section 9 of Text) 
A channel 7 feet deep and 150 feet wide from Mobile Bay to an 
anchorage basin of same depth, about 7 acres in area, in 
marsh just north of Fort Gaines on Dauphin Island; a 
channel 4 feet deep and 40 feet wide from anchorage basin 
to Dauphin Island Bay; and a jetty and revetment to 
protect entrance channel; and (b) an anchorage basin 7 
feet deep and 500 feet square at Dauphin Island village, 
with an entrance channel of like depth, 100 feet wide and 
about 8,300 feet long, extending to 7-foot hydrographic 
contour in Mississippi Sound. 
DOG AND FOWL RIVERS, ALA. (See Section 10 of Text) 
To provide small craft navigation on west side of Mobile 
Bay. 
EAST PASS CHANNEL FROM GULF OF MEXICO INTO CHOCTAWHATCHEE 
BAY, FLA. (see Section 11 of Text) 
Maintenance of 12-foot channel from Choctawhatchee Bay 
into Gulf, and maintenance of 6-foot channel into Old 
Pass Lagoon. 
Construction of twin jetties. 
(present project dimensions) 
EAST PEARL RIVER, MISS. (See Section 12 of Text) 
A channel from mouth of West Pearl River for 58 miles 
to mouth of Bogalusa Creek at Bogalusa, La., 7 feet 
deep at low water with a bottom width of 100 feet in river 
sections and 80 feet in canal section; with locks 65 by 310 
feet clear inside dimensions. 
ESCAMBIA AND CONECUH RIVERS, FLA. AND ALA. (See Section 13 
of Text) 
A 10- by 100-foot channel in Escambia Bay for 5 miles 
to mouth of Escambia River, thence up Escambia River 
to about mile 7, thence a channel 5 feet deep for 50 
miles to Florida State line, and thence improvement of 
Conecuh River to mouth of Patsaliga Creek, a distance 
of 80 miles. 
H. Doc. 470, 81st Cong., 2d 
sess. 
H. Doc. 194, 88th Cong., 2d 
sess. 
H. Doc. 328, 60th Cong., 1st 
sess. 
H. Doc. 75, 85th Cong., 1st 
sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 10-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
May 17, 1950 
March 23, 19671 
Aug. 26, 1937 
June 25, 1910 
Aug. 30, 1935 
June 25, 1910 
Aug. 30, 1935 
July 3, 1930 
July 3, 1930 
July 3, 1930 
July 23, 1942 
June 17, 1943 
Mar. 2, 1945 
May 17, 1950 
Nov. 7, 1966 
FLY CREEK, FAIRHOPE, ALA. (See Section 14 of Text) 
A channel 6 feet deep, 80 feet wide, and about 1,650 feet 
long from 6-foot depth in Mobile Bay to a turning basin 
of same depth, 100 feet wide and 350 feet long, in Fly 
Creek. 
GRAND LAGOON, PANAMA CITY, FLA. (See Section 15 of Text) 
An 8-by 100-foot channel in Grand Lagoon from St. Andrew 
Bay to a point about 2,400 feet east of State Highway 392 
bridge, thence branching to serve terminal facilities on 
the north and south shores, both channels terminating at 
the bridge. Western ends of the channel connected by a 
channel 650 feet long, parallel to the bridge. The 
connecting channel and the reaches opposite the terminal 
facilities 150 feet wide. 
GULF INTRACOASTAL WATERWAY BETWEEN APALACHEE BAY, FLA., AND 
MEXICAN BORDER (Mobile District) (See Section 16 of Text) 
APALACHICOLA BAY TO ST. MARKS RIVER, FLA. 
A channel 9 feet and 100 feet wide at mean low water 
from Apalachicola Bay, Fla., via St. George Sound, 
Carrabelle, Crooked, and Ochlockonee Rivers and 
Ochlockonee and Apalachee Bays to St. Marks River, Fla. 
APALACHICOLA RIVER TO ST. ANDREW BAY, FLA. 
A channel 5 feet deep at mean low water and 65 feet 
wide at the bottom. 
A channel 9 feet deep at mean low water and 100 feet 
wide at the bottom. 
CHOCTAWHATCHEE BAY TO WEST BAY, FLA. 
A channel 9 feet deep at mean low water and 100 feet wide 
at the bottom. 
A channel 6 feet deep at mean low water, with no 
reference to width. 
CHOCTAWHATCHEE BAY TO PENSACOLA BAY, FLA. 
A channel 9 feet deep at mean low water and 100 feet 
wide at the bottom. 
PENSACOLA BAY, FLA., TO MOBILE BAY, ALA. 
A channel 9 feet deep at mean low water and 100 feet 
wide at the bottom. 
MOBILE BAY, ALA., TO NEW ORLEANS, LA. 
A channel 300 feet wide and 10 feet from the 10 
foot contour in Mobile Bay to the 10-foot contour 
in Mississippi Sound. 
A channel 100 feet wide and 9 feet deep from Lake 
Pontchartrain to Mississippi Sound. 
APALACHEE BAY, FLA., TO NEW ORLEANS, LA. 
A channel 12 feet deep and 125 feet wide at mean low 
water, except in the section between Mobile, Ala., 
and New Orleans, La., where the width is to be 
150 feet. 
Conditional acquisition of Gulf County Canal, Fla., 
and enlargement of the canal to 9 feet deep and 100 
feet wide. 
Construction of a movable span in the Georgia, Florida 
& Alabama R.R. bridge crossing the Ochlockonee River. 
Abandonment and closure of original channel between 
Big Lagoon and Pensacola Bay and construction of a 
new channel to enter the bay north of original 
entrance. 
Authorized enlargement of Gulf County Canal to 12 by 
125 feet. 
H. Doc. 194, 81st Cong., 1st 
sess. 
H. Doc. 291, 75th Cong., 1st 
sess. 
H. Doc. 670, 61st Cong., 2d 
sess. 
Rivers and Harbors Committee 
Doc. 52, 72d Cong., 2d sess. 
H. Doc. 259, 72d Cong., 1st 
sess. 
H. Doc. 565, 61st Cong., 2d 
sess. 
Rivers and Harbors Committee 
Doc. 42, 73d Cong., 2d sess. 
H. Doc. 42, 71st Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc. 4, 71st Cong., 1st sess. 
H. Doc. 341, 71st Cong., 2d 
sess. 
Public Law 675, 77th Cong., 
and H. Doc. 96, 79th Cong., 
1st sess. 
H. Doc. 257, 76th Cong., 1st 
sess. and Public Law 75, 78th 
Cong. 
H. Doc. 442, 76th Cong., 1st 
sess. 
H. Doc. 325, 81st Cong., 1st 
sess. 
Public Law 89-789, 89th 
Cong., 2d sess. 
366

TABLE 10-B (Continued) 
MOBILE, ALA., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 3, 1899 
Mar. 2, 1907 
Feb. 27, 1911 
Jan. 21, 1927 
July 23, 1930 
June 30, 1948 
July 3, 1958 
Sept. 22, 1922 
Aug. 30, 1935 
May 17, 1950 
Aug 26, 1937 
Mar. 2, 1945 
Sept. 3, 1954 
Sept. 3, 1954 
Aug. 30, 1935 
367 
GULFPORT HARBOR, MISS. (See Section 17 of Text) 
A channel 19 feet deep and 300 feet wide from the anchorage 
basin at Ship Island to Gulfport, Miss., and an anchorage 
basin next to the shore end 19 feet deep and not less 
than 2,640 feet by 1,320 feet in area. 
Combined Ship Island Pass with Gulfport Harbor project. 
Increased depth to 26 feet and width to 300 feet across 
Ship Island Bar and depth to 19 feet in channel from 
Anchorage basin at Ship Island to Anchorage basin at 
Gulfport. 
Authorized relocation of channel across Ship Island Bar. 
Increased depth to 27 feet and width to 300 feet across 
Ship Island Bar, 26 feet deep and 220 feet wide through 
Miss. Sound and depth of 26 feet in the Anchorage Basin 
at Gulfport. 
Increased depth to 32 feet and width to 300 feet across 
Ship Island Bar, 30 feet deep and 225 feet wide through 
Miss. Sound, and a depth of 30 feet in the Anchorage 
Basin at Gulfport. 
Maintenance of the existing commercial small-boat harbor 
and an approach channel 100 feet wide and 4,300 feet 
long, from deep water in Miss. Sound to the Small-boat 
Basin, all at a depth of 8 feet. 
LA GRANGE BAYOU, FLA. (See Section 18 of Text) 
Channel 6 feet deep, 100 feet wide and about 10,700 feet 
long, extending from near the mouth of La Grange Bayou 
to the mouth of Four Mile Creek; no work was done under 
this authorization. 
Modified the required local cooperation and provided for 
a channel 9 feet deep and 100 feet wide and the 
extension of the project to Freeport, Fla. 
Channel 12 feet deep and 100 feet wide, and a turning basin 
of the same depth 200 feet wide and 400 feet long. 
MOBILE HARBOR, ALA. (See Section 19 of Text) 
For improvement of Threemile Creek by snagging from 
Mobile River to the Industrial Canal. 
Adoption of existing channel through Garrows Bend from 
Choctow Point to Arlington pier, 27 feet deep and 150 
feet wide, with 2 turning basins. Adoption of the 
existing channel alongside Arlington pier from the 
Mobile Bay Channel to turning basin at the inner end 
of Garrows Bend Channel, 27 feet deep and 150 feet wide. 
A channel 25 feet deep and generally 500 feet wide in 
Mobile River from the highway bridge to the mouth of 
Chickasaw Creek thence 25 feet deep and 250 feet wide in 
Chickasaw Creek to a point about 400 feet below Shell 
Bayou. 
Enlarging Mobile Bar Channel to 42 by 600 feet. 
Enlarging Mobile Bay Channel to 40 by 400 feet. 
Deepening Mobile River Channel below highway bridge to 
40 feet over present widths, including existing 
turning basins and anchorage areas. Widening river 
channel opposite Magazine Point to provide a 40- by 800- 
by 1,400-foot turning basin. 
Closure of Garrows Bend Channel by construction and 
operation of an earth-filled causeway across said channel 
(work to be done by local interests). 
PANAMA CITY HARBOR, FLA. (See Section 20 of Text) 
Channels 27 and 29 feet deep. Abandonment of project 
adopted by act of June 25, 1910. 
H. Doc. 120, 55th Cong., 3d 
sess. 
H. Doc. 2, 60th Cong., 1st 
sess. 
H. Doc. 692, 69th Cong., 2d 
sess. 
H. Doc. 112, 81st Cong., 1st 
sess. 
S. Doc. 123, 84th Cong., 2d 
sess. 
H. Doc. 111, 67th Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc. 49, 74th Cong., 1st sess. 
H. Doc. 190, 81st Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc. 69, 74th Cong., 1st sess. 
H. Doc. 739, 79th Cong., 2d 
sess. 
H. Doc. 74, 83rd Cong., 1st 
sess. 
H. Doc. 74, 83rd Cong., 2d 
sess. 
H. Doc. 33, 73d Cong., 1st 
sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 10-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 2, 1945 Maintenance of a channel in Watson Bayou 100 feet wide H. Doc. 555, 76th Cong., 3d 
June 30, 1948 
Mar. 4, 1913 
Mar. 4, 1915 
May 17, 1950 
Sept. 3, 1954 
July 3, 1958 
July 14, 1960 
July 14, 1960 
Mar. 2, 1945 
June 14, 1880 
April 21, 1900 
Aug. 30, 1935 
Nov. 7, 1966 
June 13, 1902 
and 10 feet deep from that depth in St. Andrew Bay to 
the highway bridge. 
Channels 32 and 34 feet deep. 
PASCAGOULA HARBOR, MISS. (See Section 21 of Text) 
Provides for through channel from the Gulf to mile 4 on 
Dog River, 25 by 300 feet through Horn Island Pass, 
thence 22 by 225 feet across Mississippi Sound and up 
Pascagoula River to the railroad bridge, thence 22 by 
150 feet in Pascagoula River above bridge, and up Dog 
River to mile 4, all subject to financial participation 
by local interests. 
Waived requirement for financial participation by local 
interests. 
Cutoff channel, 12 by 125 feet, from State Highway 63 
bridge to mile 4 on Dog River, via Robertson and 
Bounds Lakes. 
Modification to provide for channel dimensions of 35 by 
325 feet through Horn Island Pass, thence 30 by 275 feet 
across Mississippi Sound and up Pascagoula River to the 
railroad bridge, and a turning basin just below the 
bridge. 
Reimbursement of local interests for work done on Dog 
River cutoff ($44,000). 
Modification to provide for maintenance of 12- by 125-foot 
channel to mile 6 on Dog River, and maintenance of 30- 
by 225-foot side channel from main ship channel in 
Mississippi Sound to the mouth of Bayou Casotte, thence 
30 by 300 feet in Bayou Casotte to a turning basin of the 
same depth 1 mile above the mouth. 
Deepening the Horn Island Pass channel to 38 feet and 
deepening the main ship channel in Mississippi Sound, 
the river channel to the railroad bridge, and the 
turning basin all to 33 feet. 
PASS CHRISTIAN HARBOR, MISS. (See Section 22 of Text) 
Provides for Improvement and Maintenance of a harbor within 
existing bulkheads and breakwaters constructed by local 
interests, and of an entrance channel, both to a depth of 
7 feet. Entrance channel is 100 feet wide and harbor is 
about 1,000 feet along the shore by 700 feet wide. 
PEARL RIVER, MISS. AND LA. (See Section 23 of Text) 
Provided for a 5-foot channel 
Legalized construction of a fixed Highway bridge at 
Rockport. 
A channel from the mouth of West Pearl River for 58 
miles to the mouth of Bogalusa Creek at Bogalusa, 
La., 7 feet deep at low water with a bottom width 
of 100 feet in the river sections and 80 feet in 
the canal section; with locks 65 by 310 feet clear 
inside dimensions. 
Construction of cut-offs and easement of critical 
bends at eight locations below lock 1 with no 
increase in project depth. 
PENSACOLA HARBOR, FLA. (See Section 24 of Text) 
A channel 30 feet deep at mean low water and 500 feet 
wide from the Gulf of Mexico to the dock line at the 
east end of the city of Pensacola, and also provided 
that $150,000 may be used in constructing or purchasing 
a seagoing suction dredge. 
368 
sess. 
H. Doc. 559, 80th Cong., 2d 
sess. 
H. Doc. 682, 62d Cong., 2d 
sess. 
River and Harbor Committee 
Doc. 12, 63d Cong., 2d sess. 
H. Doc. 188, 81st Cong., 1st 
sess. 
H. Doc. 98, 86th Cong., 1st 
sess. 
H. Doc. 98, 86th Cong., 1st 
sess. 
Chief of Engineers report 
dated Nov. 3, 1960. 
H. Doc. 214, 77th Cong., 2d 
sess. 
H. Doc. 98, 45th Cong., 3d 
sess. 
H. Doc. 145, 65th Cong. 1st 
sess. 
H. Doc. 408, 75th Cong., 2d 
sess. 
H. Doc. 482, 89th Cong., 2d 
sess.

TABLE 10-B (Continued) 
MOBILE, ALA., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 30, 1935 
Aug. 26, 1937 
Mar. 2, 1945 
August 27, 1962 
Oct. 27, 1965 
July 25, 1912 
Aug. 26, 1937 
Mar. 2, 1945 
Sept. 3, 1954 
Mar. 3, 1899 
June 18, 1902 
Mar. 3, 1905 
Mar. 2, 1907 
July 25, 1912 
July 27, 1916 
Modified the existing project to provide for the present 
inner channels and the deepening of the entrance 
channel to 32 feet. 
Improvement of Bayou Chico. 
Modified improvement of Bayou Chico, Fla. 
Maintenance of the entrance channel from the Gulf of 
Mexico to lower Pensacola Bay, a distance of about 5 
miles to dimensions of 35 feet deep and 500 feet wide; 
maintenance of a channel along the south side of the 
aircraft carrier mooring basin, a distance of about 2.5 
miles, to dimensions of 33 feet deep and 300 feet wide; 
a bay channel 33 feet deep, 300 feet wide, and about 2.1 
miles long; parallel approach channels to opposite ends 
of the inner-harbor channel, about 1.3 and 1.4 miles in 
length, each 33 feet deep, 300 feet wide, and flared at 
the junctions with the inner-harbor channel; and 
deepening the existing 500-foot wide inner-harbor channel 
to a depth of 33 feet and lengthening it to 3,950 feet. 
PERDIDO PASS CHANNEL, ALA. (See Section 25 of Text) 
A 12- by 150-foot channel stabilized by twin rubblemound 
jetties, from the Gulf of Mexico into Perdido Pass, 
thence 9 by 100 feet into Perdido Bay with a spur channel 
of the same dimensions into Terry Cove. 
PORT ST. JOE, FLA. (See Section 26 of Text) 
A channel 24 feet deep and 300 feet wide across the bar at 
the entrance to the bay. 
An entrance channel 300 feet wide and 29 feet deep, and a 
bay channel 200 feet wide and 27 feet deep, with a 
turning basin at the proposed municipal pier at Port 
St. Joe. 
Adoption of south channel 27 feet deep and 200 feet wide 
from bay to turning basin, provision of a 32- by 300-foot 
entrance channel, a 32- by 200-foot north bay (inner) 
channel, and a 32- by 1,000- by 2,000-foot turning basin. 
Enlargement of the channel to provide for a depth of 37 
feet and a width of 500 feet at the Gulf end, diminishing 
in width to 400 feet over a distance of 3.6 miles, thence 
37 by 400 feet for a distance of 3.3 miles, thence 35 by 
300 feet in St. Joseph Bay to the turning basin, a distance 
of 7.1 miles, and a harbor channel in the basin 35 feet 
deep, 250 feet wide, and 2,000 feet long. 
REMOVING WATER HYACINTHS, MOBILE DISTRICT (See Section 27 of 
Text) 
Appropriations made for the States of Florida and Louisiana 
and provided for the extermination or removal of plants, 
the building of boats, and the establishment of booms. 
Use of any mechanical, chemical, or other means whatsoever. 
Appropriation made available for the State of Texas. 
Appropriation made for Florida, provided that no chemical 
process injurious to cattle shall be used. 
Appropriation made available for the State of Mississippi, 
and also made available for use in that State the 
operating plant pertaining to the work of Louisiana. 
Appropriation made available for the State of Alabama. 
H. Doc. 253, 72d Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc. 96, 74th Cong., 2d sess. 
H. Doc. 743, 79th Cong., 2d 
sess. 
H. Doc. 528, 87th Cong., 2d 
sess. 
S. Doc. 94th Cong., 2d 
sess. 
H. Doc. 660, 62d Cong., 2d 
sess. 
Rivers and Harbors Committee 
Doc. 10, 76th Cong., 1st 
sess. 
S. Doc. 17, 77th Cong., 1st 
sess., and report of Chief 
of Engineers. 
H. Doc. 595, 81st Cong., 2d 
sess. 
H. Doc. 91, 55th Cong., 1st 
sess. 
369 
I

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 10-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 24, 1946 
1907 
June 30, 1948 
WATERWAY CONNECTING TOMBIGBEE AND TENNESSEE RIVERS, ALA. AND 
MISS. (See Section 28 of Text) 
A waterway connecting Tennessee and Tombigbee Rivers via 
East Fork of Tombigbee River, Mackeys and Yellow Creeks. 
Plan of improvement consists of three sections: river 
section, 9-by 300-foot channel for 168 miles between 
Demopolis and Amory, Miss.; canal section, 12 by 300 
feet for 45 miles from Amory to Bay Springs; divide 
section, 12 by 300 feet (except in the 26-mile-long 
divide cut in which bottom width would be 280 feet) 
for 40 miles from Bay Springs through dividing ridge 
to Tennessee. Total lift of 341 feet to be accomplished 
by 10 locks. 
WOLF AND JORDAN RIVERS, MISS. (See Section 29 of Text) 
Provides for dredging at mouths of these streams, channels 
7 feet deep at mean low water and 100 feet wide, 
extending from 6-foot contour in St. Louis Bay to 7-foot 
contour in each stream. Under ordinary conditions 
mean tidal range is about 1.75 feet, and extreme 3.5 feet. 
AUTHORIZED BEACH EROSION CONTROL PROJECT (See Section 33 
of Text) 
Provides for Federal participation toward repair of the 
Harrison County seawall. 
FLOOD CONTROL 
BALDWIN AND HANNON SLOUGHS, MONTGOMERY, ALA. (See Section 
34 of Text) 
Provides for protection from flood damage. 
JACKSON AND EAST JACKSON, MISS. (See Section 35 of Text) 
Provides for improvement of Pearl River at Jackson, Miss., 
for flood control, to be obtained by construction of 
levees about 62,620 feet long, three pumping stations, 
and 5.04 miles of channel rectification including a 
cutoff 2.3 miles long in Pearl River. 
LAKE DOUGLAS, DECATUR COUNTY, GA. (See Section 36 of 
Text) 
To provide an outlet for excess runoff from Lake Douglas 
and Big Lakes. 
OKATIBBEE RESERVOIR, MISS. (See Section 37 of Text) 
Provides for a dam and reservoir for flood control, 
water supply, water quality control, and recreation. 
TOMBIGBEE RIVER TRIBUTARIES, MISS. AND ALA. (See Section 
38 of Text) 
Provides for improvement of 22 tributaries of Tombigbee 
River. 
MULTIPLE PURPOSE PROJECTS INCLUDING POWER 
ALABAMA-COOSA RIVERS, ALA. AND GA. (See Section 42 
of Text) 
Provides for full development of Alabama-Coosa Rivers 
and tributaries for navigation, flood control, 
power, recreation and other purposes. 
Authorized construction of Carters Dam and Reservoir, 
Ga., Claiborne Lock and Dam, Ala., Jones Bluff Lock 
and Dam, Ala., and Millers Ferry Lock and Dam, Ala. 
Suspended comprehensive plan to permit non-Federal 
interests to develop Coosa River by constructing 
series of dams. 
Public Law 858, 80th Cong. 
2d sess. 
H. Doc. 441, 86th Cong., 2d 
sess. 
Public Law 858, 80th Cong., 
2d sess. 
H. Doc. 549, 87th Cong., 2d 
sess. 
H. Doc. 167, 84th Cong., 1st 
sess. 
H. Doc. 414, 77th Cong., 
1st sess. 
Public Law 436, 83rd Cong. 
370 
H. Doc. 486, 79th Cong., 2d 
sess. 
H. Doc. 917, 59th Cong., 1st 
sess. 
H. Doc. 682, 80th Cong., 2d 
sess. 
March 18, 19702 
July 14, 1960 
Nov. 25, 19662 
Oct. 23, 1962 
July 23, 1958 
Mar. 2, 1945 
June 28, 1954

TABLE 10-B (Continued) 
MOBILE, ALA., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 18, 1941 
Dec. 22, 1944 
Mar. 2, 1945 
July 24, 1946 
Dec. 22, 1944 
July 24, 1946 
Dec. 22, 1944 
July 24, 1946 
May 19, 1953 
Dec. 22, 1944 
July 24, 1946 
Dec. 22, 1944 
Oct 27, 1965 
Oct. 27, 1965 
Dec 30, 1965 
May 19, 1953 
Dec. 22, 1944 
Public Law 228, 77th Cong., 
1st sess. 
H. Doc. 674, 76th Cong., 
3d sess. 
H. Doc. 324, 76th Cong., 1st 
sess. 
H. Doc. 300, 80th Cong., 1st 
sess. 
ALLATOONA RESERVOIR, COOSA RIVER BASIN, GA. (See Section 
42-A of Text) 
Provides for dam and reservoir for flood control, 
regulation of stream flow for navigation, development 
of hydroelectric power and recreation. 
APALACHICOLA, CHATTAHOOCHEE, AND FLINT RIVERS, ALA., 
GA. AND FLA. (see Section 43 of Text) 
Development of Apalachicola, Chattahoochee and Flint 
Rivers for navigation, flood control, hydropower, and 
recreation. 
Modified general plan for full development of 
Apalachicola, Chattahoochee and Flint River System 
and authorized construction of Buford multipurpose 
reservoir. 
Authorized recreation facilities. 
BUFORD DAM AND RESERVOIR, GA. (See Section 43 A of 
Text) 
Modification of general plan for development of 
Apalachicola, Chattahoochee and Flint Rivers 
to provide construction of Buford Dam and 
Reservoir. 
Provision of recreation facilities. 
COLUMBIA LOCK AND DAM, ALA., AND GA. (See Section 
43B of Text) 
Construction of high dam at Walter F. George site 
and low dam at Columbia site 
Approval of plan proposed in Act of July 24, 1946. 
Provided recreation facilities. 
JIM WOODRUFF LOCK AND DAM, GA. AND FLA. (See Section 
43C of Text) 
Authorized construction. 
Provided recreation facilities. 
LAZER CREEK DAM AND RESERVOIR, GA. (See Section 
43D of Text) 
Authorized construction. 
LOWER AUCHUMPKEE CREEK DAM AND RESERVOIR, GA. (See Section 
43E of Text) 
Authorized construction. 
SPEWRELL BLUFF DAM AND RESERVOIR, GA. (See Section 
43F of Text) 
Authorized construction. 
WALTER F. GEORGE LOCK AND DAM, ALA. AND GA. (see 
Section 43G of Text) 
Authorized construction of high dam at Walter F. 
George site and low dam at Columbia site. 
Recreation facilities added. 
H. Doc. 300, 80th Cong., 1st 
sess. 
H. Comm. Public Works. 
H. Doc. 300, 80th Cong., 1st 
sess. 
H. Doc. 567, 87th Cong., 2d 
sess. 
H. Doc. 567, 87th Cong., 2d 
sess. 
H. Doc. 567, 87th Cong., 2d 
sess. 
H. Comm. on Public Works 
371 
H. Doc. 300, 80th Cong., 1st 
sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 10-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
WEST POINT DAM AND RESERVOIR CHATTAHOOCHEE RIVER 
BASIN, GA. AND ALA. (see Section 43H of Text) 
Oct. 23, 1962 Authorized construction for flood control, power H. Doc. 570, 87th Cong., 2d 
recreation, fish and wildlife development, and sess. 
streamflow regulation for downstream navigation. 
1. Authorized by Chief of Engineers under Section 107 of 2. Authorized by Chief of Engineers under Section 205 of 
1960 River and Harbor Act. Flood Control Act of 1948, as amended. 
TABLE 10-C TOTAL COSTS OF EXISTING PROJECTS TO JUNE 30, 1970 
See Section Project Funding New Work Maintenance Operating Rehabilitation Total 
in Text and Care 
6. Black Warrior and Regular $103,944,027 $23,124,755 $24,421,077 $ - $151,489,859 
Tombigbee Rivers, Public Works 79,220 - - - 79,220 
Ala. 
Emergency 607,308 - - 607,308 
Relief 
Totals $104,630,555 $23,124,755 $24,421,077 $152,176,387 
19. Mobile Harbor, Ala. Regular 7,750,591 15,685,608 - - 23,436,199 
Public Works 14,000 - 14,000 
Emergency 41,242 - 41,242 
Relief 
Totals $ 7,805,833 $15,685,608 - $ 23,491,441 
20. Panama City Regular 105,058 2,549,479 - 457,467 3,112,004 
Harbor, Fla. Public Works 581,959 - - 581,959 
Totals $ 687,017 2,549,479 - $457,467 $ 3,693,963 
TABLE 10-E LOCKS IN PEARL RIVER PROJECT 
(See Section 23 of Text) 
Lock 1 2 3 
Miles above mouth 29.7 40.8 44.0 
Nearest town Pearl River, La. Bush, La. Sun, La. 
Miles to nearest town 9 3 2 
Greatest length available for full width (feet) 310 310 310 
Width of chamber (feet) 65 65 65 
Lift (feet) 26.7 15 11 
Depth over sills at low water (feet) 10 10 10 
Character of foundation Sand, gravel, silt, clay Sand, gravel, silt, clay Sand, gravel, silt, clay 
Type of construction Concrete and steel Concrete and steel Concrete and steel 
Years completed 1949 1950 1950 
Date opened for navigation November 1953 November 1953 November 1953 
Actual cost of lock $2,119,110 $1,967,537 $1,497,539 
372

TABLE 1O0 -D 
BLACK WARRIOR AND TOMBIGBEE RIVERS, ALA. 
LOCKS AND DAMS 
(See Section 6 of Text) 
Greatest Depth 
Length Width Over Character Kind Year Actual 
Miles Nearest Distance Available of Lift Sills at Character Kind Type Construction Year Opened Cost 
Mobile1 (AT a) (miles) for Full Chamber (feet) Low Founation Dm Lock Completed to of Lock 
Width (feet) Water Navigation and Dam 
(feet) (feet) 
Jackson 116.7 Coffeeville 3 600.0 110 34 13.0 Rock Gated Concrete Concrete 1965 1960 $21,597,264 
Demopolis 213.2 Demopolis 2 600.0 110 40 13.0 Rock Fixed Concrete Concrete 1962 1954 19,774,5832 
Warrior 261.1 Eutaw 6 600.0 110 22 13.0 Sand, clay Gated Concrete Earth 1962 1957 13,295,5532 
William Bacon 338.1 Tuscaloosa - 460.0 95 30 10.8 Hard shale Fixed Concrete Concrete 1940 1939 4,450,874 
Oliver 
Holt 347.0 Tuscaloosa 6 600.0 110 64 13.0 Shale, Sand- Gated Concrete Concrete 1969 1966 28,100,0002'3 
stone 
John Hollis 
Bankhead4 365.5 Adger 20 285.5 52 68 13.0 Sandstone Fixed Concrete Concrete 1915 1915 3,824,8595 ' 6 
Total Lift 258 
1. Mileage from foot of Government Street, Mobile, Ala. 5. Excludes $1,435,636 estimated cost of land submerged, damage to structures, and 
2. Excludes cost of recreational facilities to be provided at completed projects under cost of clearing. 
Code 710. 6. Excludes costs of $3,347,300 for rehabilitation of spillway and estimated (1970) cost 
3. 1970 estimate. of $38,400,000 for rehabilitation of lock. 
4. Double-lift lock. (To be rebuilt to single-lift lock.) 
-4 
(rQ 
O
hXI 
r
t" 
r 
,,P
Cj

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 10-F 
RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 30 of Text) 
Project Date of Survey Cost During 
Fiscal Year 1 
Bluff Creek, Miss. Sept 1969 $ 441 
Bon Secour River, Ala. Sept 1969 2,749 
Carrabelle Harbor, Fla. May 1970 1,430 
St. Marks River, Fla. May 1970 533 
Panacea Harbor, Fla. May 1970 446 
Pascagoula River, Miss. Sept 1969 445 
1. Cost of surveys included with maintenance costs under table "Other Authorized Navigation." 
TABLE 10-G OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 31 in Text) 
For Last Cost to June 30, 1970 
Full Report 
Name of Project See Annual Operation & 
Report for Construction Maintenance 
Aquatic Plant Control3 (1958 and 1962 Acts) 1968 324,814 
Bayou Galere, Miss. '2 1946 - 
Bluff Creek, Miss. 3'4 1963 1,000 5,913 
Bogue Chitto, La.1 1909 14,913 12,930 
Bon Secour River, Ala. 1969 118,615 19,351 
Cahaba River, Ala. 1'4 1894 45,000 
Carrabelle Bar and Harbor, Fla.3 1966 503,331 310,019 
Choctawhatchee River, Fla. and Ala.3 1949 171,885 266,445 
Holmes Creek, Fla. 1 ,3 1931 8,562 36,800 
Leaf and Chickasawhay Rivers, Miss. 1,4 1919 23,090 42,676 
Noxubee River, Miss.1,3, 4 1902 47,528 14,472 
Ochlockonee (Ochlockney) River, Ga. and Fla. 1' 4 1900 5,000 
Old Town Creek, Miss.4 1887 3,000 
Oostanaula and Coosawatee Rivers, Ga.4 1907 32,656 
Panacea Harbor, Fla. 3'5 1968 122,383 5,693 
Pascagoula River, Miss. s 1956 15,000 165,312 
Pearl River, Miss., Edinburg to Jackson 2 1911 31,872 36,991 
St. Marks, River, Fla.3 1965 1,710,809 22,744 
Tallapoosa River, Ala. 1 , 3 ,4 1893 43,972 
Upper Chipola River, Fla., from Mariana to 
its mouth4 1941 36,781 63,193 
1. No commerce reported. 
2. Inactive. 
3. Completed. 
4. Abandonment recommended in H. Doc. 467, 69th Cong. 
5. Existing project provides for maintenance only, $15,000 
spent on previous project. 
6. Exclusive of $9,700 contributed funds for new work. 
374

MOBILE, ALA., DISTRICT 
TABLE 10-H OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
(See Section 31 in Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Name of Project Report for Construction Maintenance 
Harrison County, Miss., shore protection.) 1953 1,133,000 
1. Completed. 
TABLE 10-I OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 40 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Name of Project Report for Construction Maintenance 
Alabama River at Montgomery, Ala.
4 
1965 35,721 
Armuchee Creek, Ga. 
1 
'
2 
1966 115,547 
Beaver Creek, Montezuma, Ga.1,
2 
1958 149,815 
Black Creek, Gadsden, Ala. 
1 
,2 1953 125,389 
Clanton, Ala.1,2 1964 274,024 
Collinsville, Ala.'' 
3 
1940 71,119 
Jackson County, Fla. 
1'2 
1959 129,078 
Little Cove Creek, Glencoe, Ala. 
' 2 
1965 113,849 
Pearl River, Miss., and La., Jackson, Miss. 
1 
'
5 
',
6 
1937 
Prattville, Autauga Creek, Ala.
1 
1946 649,280 
Rome, Coosa River, Ga.
1 
1955 384,550 - 
Sowashee Creek, Meridian, Miss.'' 
2 
1956 142,637 - 
Tallahala Reservoir, Miss. 
2 
,
5 1969 
Tombigbee River, Miss., and Ala.
6 
1941 134,801 - 
Town Creek, Americus, Ga." 
2 
1965 340,409 - 
Trussville, Ala.
2 
1965 141,334 - 
West Point, Chattahoochee River, Ga.' 1955 599,637 
Yellow Jacket Creek, Hogansville, Ga.1,2 1965 330,734 
1. Completed. 5. No funds authorized or work done on project. 
2. Authorized by Chief of Engineers. 6. Work authorized before 1941 completed. No work done 
3. Completed. with funds appropriated from maintenance on project proposed in 1941. 
and improvement of river and harbor works. 
4. Engineering, design, supervision, and administration (no 
construction work has been done). 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
TABLE 104- (See Section 41 of Text) 
(a) Study Identification Costs 
Cave Springs, Floyd County, Ga. $9,833 
East Jackson County, Fla. 4,101 
Gordon Creek, Hattiesburg, Miss. 291 
Valley Creek, Ala. 408 
Federal 
(b) Project Cost 
Advance preparation $ 7,826 
Emergency operations: 
Alabama flood disaster (Jefferson 4,403 
County, Ala.) 
Disaster relief caused by Hurricane Camille: 
Alabama 2,228 
Mississippi 1,045,734 
Post Hurricane Report 100,287 
Rehabilitation of Harrison County, Miss., Seawall (Camille) 2,742 
Appropriation Reimbursable Activities $35,838,838 
375.

TABLE 10-K 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
ALABAMA-COOSA RIVERS, ALA. AND GA. 
DEVELOPMENT PROPOSED UNDER EXISTING PROJECT 
(See Section 42 of Text) 
Proposed Structures Claiborne Miller's Ferry Jones Bluff Carters 
Lock and Dam Lock and Dam Lock and Dam Dam3 
Miles above mouth of river 81.81 142.21 245.41 26.82 
Nearest town Claiborne, Ala. Camden, Ala. Benton, Ala. Carters, Ga. 
Distance (miles) 7 10 3 2 
Greatest lock length available for 600 600 600 - 
full width (feet) 
Width of lock chamber (feet) 84 84 84 
Lift (feet) 30 48 45 
Elevation of normal pool surface 35 80 125 1021 
(mean sea level) 
Depth over sills at low water (feet) 13 13 13 
Character of foundation Rock Rock Rock Rock 
Kind of spillway Gated Gated Gated Fixed crest 
Height of Dam (feet) 50 85 91 423 
Type of construction Concrete Concrete Concrete Rock-fill 
earth core 
Reservoir capacity (acre-feet) 96,500 331,800 247,000 472,800 
Power development (kw) - 75,000 68,000 250,000 
Percent complete 89 95 43 42 
Estimated cost: 
Construction and design $26,018,200 $54,083,700 $50,667,000 $96,064,000 
Land and damages (including $ 1,137,000 $ 4,816,300 $ 4,933,000 $ 2,536,000 
relocations) 
Total Cost (1970) $27,155,200 $58,900,000 $55,600,000 $98,600,000 
1. Above mouth of Alabama River (river miles). 
2. Above mouth of Coosawattee River (river miles). 
3. Reregulation dam (Carters) 25.4 river miles. 
TABLE 10-L FISCAL YEAR COSTS FOR NEW WORK ON OVERALL PROJECT 
See Section Project Feature Contract iredTotal 
in Text Labor 
42. Alabama-Coosa Carters Dam $ 4,304,094 $1,538,871 $ 5,842,965 
Rivers, Ala. and Claiborne Lock and Dam 4,244,757 319,995 4,564,752 
Ga. 
Jones Bluff Lock and Dam 8,502,570 2,297,832 10,800,402 
Millers Ferry Lock and Dam 1,596,832 473,335 2,070,167 
Alabama River Channel - 53,387 53,387 
Total $18,648,253 $4,683,420 $23,331,673 
43. Apalachicola, Apalachicola River Channel $ 526,094 $ 54,234 $ 580,328 
Chattahoochee Buford Dam 208,6321 208,632 
and Flint Rivers, 
Ala., Ga., and Columbia Lock and Dam 63,2381 3,049 66,287 
Fla. Jim Woodruff Lock and Dam 128,7421 - 128,742 
Lazer Creek Dam - 125,770 125,770 
Spewrell Bluff Dam - 30,044 30,044 
Walter F. George Lock 216,4022 1,514 217,916 
and Dam 
West Point Dam 3,336,300 3,715,573 7,051,873 
Total $ 4,479,408 3,930,184 8,409,592 
1. Recreational facilities provided at completed projects (Code 710). 
2. Includes recreational facilities provided at completed project (Code 710), $31,450. 
376

APALACHICOLA, CHATTAHOCHEE, AND FLINT 
LOCKS AND DAMS AND MULTIPLE-PURPOSE DEVELOPMENT INCLUDED IN EXISTING PROJECT 
(See Section 43 of Text) 
Miles above mouth 
Nearest town 
Distance (miles) 
Greatest lock length available 
for full width (feet) 
Width of chamber (feet) 
Lift (feet) 
Elev. of normal pool 
surface (msl) 
Depth over sills at low 
water (feet) 
Character of foundation 
Kind of spillway 
Height of dam (feet) 
Type of construction 
Reservoir capacity (acre-feet) 
Power development 
(kilowatts) 
Percent complete 
Year opened to navigation 
Estimated cost: 
Construction and design 
Lands and damages (including 
relocations) 
Total 
Jim 
Woodruff 
Lock 
and Dam 
107.61 
Chattahoochee, 
Fla. 
1
450 
82 
33 
77 
14 
Limestone 
Fixed-gated 
67 
Concrete 
406,160 
30,000 
100 
1954 
Columbia 
Lock 
and Dam 
46.52 
Columbia, 
Ala. 
1
450 
82 
25 
102 
13 
Limestone 
Fixed-gated 
62 
Concrete 
18,000 
100 
1962 
Walter F. 
George 
Lock 
and Dam 
75.02 
Ft. Gaines, 
Ga. 
2
450 
82 
88 
190 
West Point 
Dam 
201.42 
West Point, 
Ga. 
2.8 
635 
LowerLazer 
Buford Auchump- Creek 
Dam kee 
Cr. Dam 
348.92 233.43 255.83 
Buford, Ga. Roberta, Ga. Thomaston, 
Ga. 
5 7 8 
1070 417 543 
Spewrell 
Bluff 
Dam 
263.83 
Manchester, 
Ga. 
8
700 
13 
Limestone Rock Rock 
Gated Gated Fixed 
114 120 193 
Concrete and Concrete and Earth 
earth earth 
934,400 605,000 2,554, 
130,000 108,375 86,00( 
100 
1963 
27 
Rock Rock 
Gated Gated 
130 142 
Concrete and Concrete and 
earth earth 
000 548,000 342,000 
0 81,000 87,000 
Rock 
Gated 
180 
Concrete and 
earth 
552,000 
100,000 
100 
$46,500,000 $12,956,100 $63,860,400 $40,722,000 $24,644,000 
$ 2,866,000 $ 396,200 $21,834,000 $25,078,000 $20,156,000 
$49,366,000 $13,352,300 $85,694,4004 $65,800,000 $44,800,000 
(1970) (1970) (1970) (1970) (1970) 
$49,540,000 $44,460,000 
$16,160,000 $ 8,140,000 
$65,700,000 $52,600,000 
(1970) (1970) 
$68,060,000 
$29,940,000 
$98,000,000 
(1970) 
1. Above mouth of Apalachicola River (river miles). 
2. Above mouth of Chattahoochee River (river miles). 
3. Above mouth of Flint River (river miles). 
4. Includes $333,198 cost of land for wildlife refuge. 
TABLE 10-M 
0
r
rr 
r
CH 
y
y 
I Ill

TABLE 10-N 
Study 
Peachtree and Nancy 
DeKalb County, Ga. 
Columbus, Miss., Tom 
River and Tributaries 
Acworth, Ga., Tanyarc 
Camp Creek, Fulton C 
Proctor Creek, Fulton 
County, Ga. 
Halls Mill Creek, Mobi 
County, Ala. 
Purple Creek, Madison 
County, Miss. 
Upper Flint River, Mu 
Jester Creeks, Ga. 
Cany Creek, Hinds 
County, Miss. 
Fivemile Creek, Jeffers 
County, Ala. 
Utoy Creek, North an( 
Utoy Creek, Fulton Cc 
Big Wills Creek, Gadsd 
Destin Coastal Area, 
Okaloosa County, Fla. 
Pascagoula-Gautier Co 
378 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COMPLETED FLOOD PLAIN INFORMATION STUDIES 
(See Section 46 of Text) 
Date 
Requesting Agency Complel 
Creeks, Atlanta Region Metropolitan Nov 196 
Planning Commission 
bigbee Board of Supervisors, Nov 196 
Lowndes County, Miss. 
d Creek Acworth, Ga. Nov 19( 
ounty, Ga. Atlanta Region Metropolitan May 19E 
Planning Commission 
Atlanta Region Metropolitan June 19 
Planning Commission 
le South Alabama Regional June 19 
Planning Commission 
-Hinds Jackson City Planning Board June 19 
d and Atlanta Region Metropolitan Jan 196 
Planning Commission 
Jackson City Planning Board Feb 196 
son Birmingham-Jefferson County June 19 
Planning Commission 
d South Atlanta Region Metropolitan June 19 
ounty, Ga. Planning Commission 
len, Ala. Gadsden City Planning Commission May 19 
Board of County Commissioners, June 19 
Okaloosa County 
astal Area Gulf Regional Planning Commission June 19
ted 
64 
65 
i7 
68 
68 
68 
68 
i9 
69 
70 
70 
70 
70 
Federal 
Cost 
$77,000 
55,000 
3,000 
50,700 
23,100 
24,500 
24,500 
44,700 
(Estimated) 
21,500 
21,500 
(Estimated) 
43,000 
22,500 
(Estimated) 
9,700 
(Estimated) 
16,200 
(Estimated)

NEW ORLEANS, LA., DISTRICT* 
District comprises a portion of Louisiana, including 
drainage area of Red River south of Fulton, Ark., in 
Arkansas and Texas, embraced in drainage basins 
tributary to Mississippi River and Gulf of Mexico, 
except Mississippi River above mile 322 above Head of 
Passes, drainage area of Ouachita-Black River Basin, 
and small eastern and western portions of Louisiana 
tributary to Pearl River and Sabine River and Lake. 
It includes sections of the Gulf Intracoastal Waterway 
from Lake Borgne Light 29 at the mouth of Pearl 
River to Sabine River, and the Passes of the Mississippi 
River. It exercises jurisdiction over flood control work 
on Mississippi River from mile 322 AHP to Gulf of 
Mexico; on Red River including its south bank levees 
and tributaries from Index, Ark., to its junction with 
Old River and Atchafalaya River; Atchafalaya River; 
and in Atchafalaya Basin; and maintenance of project 
navigation channel of Mississippi River below mile 322 
AHP, under supervision of President, Mississippi River 
Commission, and Division Engineer, Lower Mississippi 
Valley Division. 
IMPROVEMENTS 
Navigation Page 
1. Aquatic Plant Control Program ............ 380 
2. Atchafalaya River and Bayous Chene, 
Boeuf, and Black, La. ...................... 380 
3. Atchafalaya River, Morgan City to 
Gulf of Mexico, La. .......................... 381 
4. Barataria Bay Waterway, La. ................. 381 
5. Bayou Lafourche and Lafourche-Jump 
W aterway, La ............................ ..... ... 382 
6. Bayous La Loutre, St. Malo and 
Yscloskey, La. ..................................... 383 
7. Bayou Queue de Tortue, La .............. 383 
8. Bayou Segnette Waterway, La. ............ 384 
9. Bayou Teche and Vermilion River, La. 384 
10. Bayou Teche, La. .................................. 385 
11. Calcasieu River and Pass, La. ............... 386 
12. Calcasieu River salt-water barrier, La. 387 
13. Freshwater Bayou, La. .......................... 387 
14. Gulf Intracoastal Waterway between 
Apalachee Bay, Fla., and Mexican 
Border (New Orleans Dist.) ............. 387 
15. Houma navigation canal, La. ............. 390 
16. Mermentau River, Bayou Nezpique, 
and Bayou Des Cannes, La. ........... 391 
17. Mermentau River, La. ........................... 391 
18. Mississippi River, Baton Rouge to Gulf 
of M exico, La ................................. 392 
19. Mississippi River-Gulf Outlet, La. ....... 394 
20. Mississippi River-Gulf Outlet, Michoud 
Canal, La ............ ............................. 395 
21. Overton-Red River Waterway, La ....... 395 
22. Petit Anse, Tigre, and Carlin Bayous, 
La . ........... ...... ...................... 
* All cost and financial statements for projects are listed 
appear at the end of this chapter. 
396 
Navigation (cont.) Page 
23. Red River below Fulton, Ark. ............ 396 
24. Removing water-hyacinth (Louisiana) .. 397 
25. Waterway from Empire, La., to Gulf 
of Mexico ..................................... 397 
26. Reconnaissance and condition surveys .. 398 
27. Other authorized navigation projects .... 398 
28. Navigation work under special 
authorization ........................................ 398 
Flood Control 
29. Bayou Bodcau and tributaries, Ark., 
and La. ........................................ 398 
30. Bayou Bodcau Reservoir, La. .............. 399 
31. Bayou Pierre, La. ..................................... 399 
32. Caddo Lake, La. ...................................... 399 
33. Cooper Lake and Channels, Tex ........ 399 
34. Garland City, Ark. ................................... 400 
35. Grand Isle and vicinity, La. (hurricane 
protection) ..................... ................... 400 
36. Harvey Canal, and Bayou Barataria 
Levee, La. ............................................. 401 
37. Lake O'the Pines, Tex. ........................... 401 
38. Lake Pontchartrain and vicinity, 
Louisiana (hurricane protection) ........ 402 
39. Lake Texarkana, Tex........................ 403 
40. Maniece Bayou, Ark. ................ 403 
41. Mississippi River Delta at and below 
New Orleans, La. (New Orleans to 
Venice, La., hurricane protection) .... 404 
42. Morgan City and vicinity, La. 
(hurricane protection) .................... 404 
43. Red River below Denison Dam (New 
Orleans Dist.) ........................................ 405 
at the end of this chapter. All other tables are referenced in text and also 
379

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Flood Control (cont.) Page 
44. Red River below Denison Dam, Levees 
and Bank Stabilization (New Orleans 
Dist.) ................... ..................... 405 
45. Wallace Lake, La. ................................. 406 
46. Inspection of completed flood control 
projects ........................................ 406 
47. Other authorized flood control projects 406 
Flood Control (cont.) Page 
48. Flood control work under special 
authorization ........................................ 406 
49. 
50. 
51. 
General Investigations 
Surveys ........................................ 406 
Collection and study of basic data ....... 406 
Research and development ..................... 406 
NAVIGATION 
L. AQUATIC PLANT CONTROL 
PROGRAM 
Location. Lakes and streams in State of Louisiana. 
Existing project. Provides for control and progressive 
eradication of water-hyacinth, alligatorweed, and 
other obnoxious aquatic plant growth from navigable 
waters, tributary streams, connecting channels, and 
other allied waters in North Carolina, South Carolina, 
Georgia, Florida, Alabama, Mississippi, Louisiana, 
and Texas, in combined interests of navigation, flood 
control, drainage, agriculture, fish and wildlife conservation, 
public health, and related purposes, including 
continued research for development of most 
effective and economic control measures. 
The modification of 1965 provides for comprehensive 
program for control and progressive eradication 
of water-hyacinth, alligatorweed, Eurasian 
water milfoil, and other obnoxious plant growths from 
navigable waterways, tributary streams, connecting 
channels, and other allied waters of the United States, 
in combined interest of navigation, flood control, 
drainage, agriculture, fish and wildlife conservation, 
public health, and related purposes, including continued 
research for development of most effective and 
economic control measures. Research and planning 
costs undertaken pursuant to 1965 act shall be borne 
fully by the United States and shall not be included in 
costs to be shared by local interests. 
Local cooperation. Local interests must hold the United 
States free from claims and participate in project to 
extent of 30 percent of cost of operations. State of 
Louisiana, Department of Public Works and Louisiana 
Wild Life and Fisheries Commission furnished a joint 
assurance of local cooperation, which was approved 
April 29 and accepted May 4, 1959. Under provisions 
of continuing contract, local agencies will perform 
work in kind, approximating 30 percent of cost of 
program. 
Operations and results during fiscal year. A part of Teche 
Basin south of U. S. Highway 190 was treated by crews 
of the Corps. Teche Basin feeder areas north of U. S. 
Highway 190 were assigned to crews of State of 
Louisiana under contract and they continued to reduce 
area of infestation. Progress continues in this basin. All 
principal waterways of Maurepas-Pontchartrain Basin 
were cleaned by combined efforts of the Corps and 
State of Louisiana. This combined effort continues to 
obtain satisfactory results in small tributaries and main 
waterways. Large isolated lakes and streams in 
northern half of State, part of which are within limits of 
Vicksburg District, were cleaned of most surface 
vegetation. Maintenance of this area is assigned to the 
State with occasional assistance by Corps crews in some 
of the lakes and streams. Satisfactory progress is being 
made in this area. Waterways between Atchafalaya 
east guide levee and Mississippi River levee south of 
Morganza control structure are being cleaned by a 
combined effort of Corps and State crews. This work is 
progressing with satisfactory results. A combined effort 
is being made in Atchafalaya Basin on several 
waterways that are a source of reinfestation of main 
navigable waterways in Atchafalaya Basin, Gulf 
Intracoastal Waterway, and other connecting streams 
by Corps and State crews. Results are progressing in a 
satisfactory manner. During operations 17,113 acres of 
vegetation were destroyed. State of Louisiana crews 
destroyed 9,373 acres of vegetation by chemical 
treatments only. Crews of the Corps destroyed 7,740 
acres of vegetation using both chemical and mechanical 
methods. Research work to discover means to 
chemically destroy alligatorweed and other obnoxious 
aquatic plants, under contract with University of 
Southwestern Louisiana, continued with promising 
results. 
Condition at end of fiscal year. Operations under 1958 
R&H Act initiated May 1959, are complete. Operations 
under 1965 R&H Act were initiated in fiscal 
year 1968. Waterways are being cleared, then maintained 
as required. 
2. ATCHAFALAYA RIVER AND BAYOUS 
CHENE, BOEUF, AND BLACK, LA. 
Location. The improvement is located in the parishes 
of Assumption, Terrebonne, and St. Mary, La., in the 
vicinity of Morgan City, along Bayous Chene, Boeuf, 
and Black, and the Lower Atchafalaya River to the 
Gulf of Mexico. (See Mississippi River Commission 
alluvial maps, Morgan City, Belle Isle, and Point au 
380

NEW ORLEANS, LA., DISTRICT 
Fer quadrangles, Coast and Geodetic Survey Chart 
1276, and navigation maps of Intracoastal Waterway 
and Atchafalaya River system.) 
Existing project. Provides for enlargement and extension 
of project, Atchafalaya River, Morgan City to 
the Gulf of Mexico, La., to obtain navigation channels 
20 feet deep over a bottom width of 400 feet from 
vicinity of U. S. Highway 90 crossing over Bayou Boeuf 
to the Gulf of Mexico via Bayou Boeuf, Gulf Intracoastal 
Waterway, Bayou Chene and the landside 
levee borrow pit drainage channel, Lower Atchafalaya 
River, and Atchafalaya Bay to the Gulf of Mexico, and 
from near U. S. Highway 90 to Bayou Chene via Bayou 
Black and the Gulf Intracoastal Waterway. Estimated 
cost for new work (July 1970) is $12,100,000 Federal 
and $1,190,000 non-Federal. In addition, Coast Guard 
is to provide navigation aids at an estimated cost of 
$40,000. 
Local cooperation. The local agency must provide all 
lands, easements, and rights-of-way for construction 
and subsequent maintenance of the project and for aids 
to navigation upon the request of the Chief of 
Engineers, including suitable areas required in the 
general public interest for initial and subsequent 
disposal of spoil, and also necessary retaining dikes, 
bulkheads, and embankments therefor or the cost of 
such retaining works; accomplish and maintain all 
modifications to roads, bridges, pipelines, cables and 
any other utilities and improvements necessary for the 
construction and subsequent maintenance of the 
project; and hold the United States free from damages 
due to construction and maintenance of the project. 
The Board of Commissioners of the Morgan City 
Harbor and Terminal District, the local sponsoring 
agency, enthusiastically endorsed the project; however, 
diligent efforts since January 28, 1969, to obtain formal 
assurances of local cooperation from that agency have 
been unsuccessful. 
Terminal facilities. Two large and three small public 
wharves at Morgan City are open for use by all without 
charge. In addition, there are numerous privatelyowned 
facilities located on both banks of the lower 
Atchafalaya River in Morgan City and Berwick, La., 
and along Bayou Boeuf and the Gulf Intracoastal 
Waterway. Fabrication and repair facilities are located 
on Bayous Boeuf and Black. Adequate acreage is 
available for expansion of existing terminals and 
construction of new terminals along Bayous Chene, 
Boeuf, and Black, and the Gulf Intracoastal Waterway. 
Public and private terminals in the project area are 
adequately connected with rail, water and highway 
transportation facilities. No additional public wharves 
are required. 
Operations and results during fiscal year. Planning funds 
were made available late in the fiscal year. Planning 
was limited to review of engineering work performed 
by an Architect-Engineer under contract to the 
Morgan City Harbor and Terminal District. 
451-584 0-72-25 
Condition at end of fiscal year. Construction has not been 
initiated. 
3. ATCHAFALAYA RIVER, MORGAN 
CITY TO GULF OF MEXICO, LA. 
Location. Atchafalaya River is an outlet of Red River 
and controlled flow from Mississippi River. It begins at 
mouth of Red River, about 4.5 miles west of Old River 
navigation lock on northern boundary of Pointe 
Coupee Parish, and flows generally south about 135 
miles and empties into Atchafalaya Bay, an inlet of the 
gulf. Section under improvement is from 20-foot 
contour in Atchafalaya Bay, 4 miles beyond mouth of 
Atchafalaya River, to 20-foot contour in Gulf of 
Mexico. (See Coast and Geodetic Survey Chart 1276, 
Mississippi River Commission alluvial valley maps, 
Morgan City, Belle Isle, and Point au Fer quadrangles, 
and navigation maps of Gulf Intracoastal Waterway 
and Atchafalaya River system.) 
Existing project. A 20- by 200-foot channel from 20- 
foot contour in Atchafalaya Bay, to 20-foot contour in 
Gulf of Mexico. Project depth refers to mean low water. 
Normal range of tide is 10 inches; extreme range, 14 
inches; hurricane range, 10 feet. 
The existing project, prior to the modification of 
August 1968, was completed at a cost of $501,963. 
Local cooperation. Fully complied with, except for 
modification of project in connection with Atchafalaya 
River and Bayous Chene, Boeuf, and Black, La., which 
is reported separately. 
Terminal facilities. At Morgan City there are several 
small private wharves and two large and three small 
public ones open for use of all without charge. There 
are no warehouses needed, as business section is on 
riverfront and all freight is transferred directly from 
boats to stores. Facilities considered adequate for 
existing commerce. 
Operations and results during fiscal year. Hired labor 
forces conducted shoaling studies and surveys. 
The contract dredge Arkansas restored 11.9 miles of 
channel to 16-foot depth between miles 10.5 and 22.4 
below mouth of river, during period August 30 through 
December 21, 1969. 
Condition at end offiscalyear. Construction was initiated 
in fiscal year 1911 and completed in fiscal year 1914. 
Controlling depth, mean low gulf: (May 1970) bay 
channel, 12 feet, bar channel, 12 feet. 
4. BARATARIA BAY WATERWAY, LA. 
Location. In Jefferson Parish, La., and extends about 
37 miles generally southerly from junction of Gulf 
Intracoastal Waterway and Bayou Barataria near 
Lafitte Post Office. From its origin it extends southerly 
through Bayou Barataria, Bayou Dupont, a landcut 
(known as Dupre Cutoff) through marsh area, Bayou 
Cutler, Bayou St. Denis, and Barataria Bay to east end 
of Bayou Rigaud. At its southerly terminus it also 
31

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
connects with Barataria Pass and through that pass 
with the Gulf of Mexico. (See Coast and Geodetic 
Survey Charts 1050, 1116, and 1237, Geological 
Survey maps Barataria, Bay Dogris, Wilkinson Bay, 
and Barataria Pass.) 
Previous project. For details see page 562 of Annual 
Report for 1963. 
Existing project. A channel about 37 miles long with a 
12-foot depth and 125-foot width from its beginning at 
Gulf Intracoastal Waterway to Grand Isle, La., 
following route of previous project to mile 15.5 in 
Bayou St. Denis; thence by a relocated channel along 
western shore of Barataria Bay and through Barataria 
Pass to 12-foot depth contour in the gulf, with an 
extension of project to include westerly 4.3 miles of 
Bayou Rigaud. Normal range of tide is 30 inches at 
mouth and 6 inches at head. Elevation of water surface 
near mouth, due to hurricanes, has been over 6 feet. 
Existing project was completed at a cost of $1,499,648. 
Local cooperation. Fully complied with. 
Terminal facilities. Six privately owned wharves at 
Lafitte; three privately owned facilities at Grand Isle; 
and wharfage in Bayou Rigaud at Grand Isle constructed 
by shrimping industry are available to all 
boats without charge. About 7 miles below Lafitte there 
is a large oil terminal for transferring production of 
Lafitte field to barges. Adjacent to Bayou Barataria 
and along Bayou Rigaud adequate sites are available 
for future use. 
Operations and results during fiscal year. Condition and 
operation studies and surveys were conducted by hired 
labor. Restoration of the Gulf entrance channel by U. 
S. dredge Schweizer commenced February 5 and was 
completed March 31, 1970. A total of 131,000 cubic 
yards were removed. 
Condition at end of fiscal year. Construction was initiated 
in May 1960 and completed in November 1963. Total 
cost of existing project to June 30, 1970, was 
$3,055,609, of which $1,499,648 was for new work, and 
$1,555,961 for maintenance. Controlling depths, mean 
low gulf: (May 1970) Gulf Intracoastal Waterway to 
gulf, 12 feet; (Feb 1970) bar channel 13 feet; (May 
1970) Barataria Pass to Buoy 22, 12 feet; to Buoy 24, 8 
feet. 
5. BAYOU LAFOURCHE AND 
LAFOURCHE-JUMP WATERWAY, LA. 
Location. Prior to 1902 Bayou Lafourche was an 
outlet of Mississippi River, its head being at Donaldsonville, 
La., 80 miles above New Orleans. It flows 
generally southerly 107 miles to Gulf of Mexico. (See 
Coast and Geodetic Survey Charts 1116 and 1274; 
Mississippi River Commission alluvial valley maps; 
Donaldsonville, White Castle, Napoleonville, Thibodaux, 
and Lac des Allemands quadrangles; and 
Geological Survey maps Houma, Cutoff, Lake Felicity, 
Mink Bayou, Leeville, and Belle Pass quadrangles.) 
Previous projects. For details see page 564 of 1963 
Annual Report. 
Existing project. Provides for permanent closure of 
head of bayou without a lock, a channel 6 feet deep and 
60 feet wide from Canal Boulevard in Thibodaux to 
Lockport, and from LaRose to Gulf of Mexico with a 
jettied entrance at Belle Pass, and the closure of Pass 
Fourchon. These improvements are about 50.5 miles 
long, and the modification of July 14, 1960, provides 
for an additional 66 miles of improvement as follows: a 
12- by 125-foot channel, extending from Gulf Intracoastal 
Waterway at mile 37.2 west of Harvey lock 
to enter Bayou Lafourche below highway bridge at 
Leeville at about mile 12; a 12- by 125-foot channel in 
Bayou Lafourche from point of junction with proposed 
12-by 125-foot channel to 12-foot depth contour in 
gulf; modification and extension of existing jetties from 
6- to 12-foot contour, if found advisable to reduce 
maintenance dredging in the gulf; and a channel 9 by 
100 feet in Bayou Lafourche from Leeville to vicinity of 
lower limits of Golden Meadow; and a 12- by 125-foot 
channel from Bayou Lafourche at Leeville from point 
where auxiliary channel connects with Bayou Lafourche 
through Southwestern Louisiana Canal to and 
through Bayou Rigaud to connect with enlargement of 
Bayou Rigaud recommended under project "Barataria 
Bay Waterway, La." Normal range of tide is 10 inches 
at mouth and 3 inches at head; from severe rains, 3 to 
10 feet at head; from hurricanes, up to 10 feet at 
mouth. Estimated cost for new work (July 1970) is 
$7,320,000, Federal, and $3,120,000, non-Federal. In 
addition, Coast Guard is to provide navigation aids at 
an estimated cost of $31,000. (Excavation of a channel 6 
feet deep and 60 feet wide from Thibodaux to Gulf 
Intracoastal Waterway at Lockport is considered 
inactive and excluded from foregoing cost estimate. 
Estimated cost of this portion (July 1970) is $733,000. 
Local cooperation. Assurances received and accepted on 
all items of work in the project. Golden Meadow to gulf" 
Local agency has conveyed to the United States title to 
all necessary channel and spoil easements. Leeville to 
Grand Isle: State of Louisiana, Department of Public 
Works, proposes to construct that portion of work at 
junction of project and Bayou Lafourche. Due to 
multiplicity and other complications of ownership, 
there will be no conveyance of easements to the United 
States in this section; however, the local cooperating 
bodies will be requested to obtain and convey to the 
United States easements over all other lands involved 
in this reach. Auxiliary channel. Local interests have not 
as yet obtained perpetual channel and spoil easements 
for the project nor arranged for removal or relocation 
of improvements situated thereon. They have, however, 
furnished a resolution wherein it is stated that 
interfering pipelines will be relocated prior to our 
contractor reaching the pipeline sites. 
Terminal facilities. There are numerous private warehouses, 
wharves, and stiff-leg derricks for handling 
cane along bayou. At Lockport, Barker Barge Line has 
382

NEW ORLEANS, LA., DISTRICT 
a barge wharf with covered shed, and Southern Pacific 
Railroad maintains a large wharf with covered shed. 
At Golden Meadow each of the seafood canneries has 
docking facilities suitable for its needs. Four oil 
companies have docks at Leeville for transferring 
production of Leeville oil fields to barges. Facilities 
considered adequate for existing commerce. 
Operations and results during fiscal year. New work by 
hired labor consisted of general engineering and 
planning. 
Maintenance by hired labor consisted of condition 
and operation studies and channel patrol. 
Condition at end of fiscal year. Construction of existing 
project was initiated in fiscal year 1939 and is 16 
percent complete. Dredging between Larose, La., and 
Gulf of Mexico was completed in 1939 and that 
segment between Lockport and Napoleonville, La., is 
in an inactive status due to lack of right-of-way and 
spoil area. Jetties at mouth of Belle Pass were 
completed in 1939, and later damaged by storm action, 
which required placement of additional stone adjacent 
to both sides of steel sheet pile jetties in 1940, and repair 
and extension of jetties in 1941. During fiscal year 1948 
stone jetties were repaired and extended inland about 
700 feet from shoreline; and steel sheet pile section was 
strengthened for about 250 feet gulfward of stone 
jetties, by placement of stone on both gulf and bayou 
sides. On May 31, 1949, an automatic tide gage for 
recording hurricane and storm tides was installed. 
Modification of July 14, 1960, was initiated in 
February 1963 and is 12 percent complete, with 12- by 
125-foot channel completed in September 1963 from 
Leeville to 12-foot contour in Gulf of Mexico, the 9- by 
100-foot channel completed in August 1966 from 
Golden Meadow to Leeville, and the 9- by 100-foot 
channel from Golden Meadow to Leeville completed in 
August 1966. Controlling depths, mean low gulf: 
(October 1969), bar and entrance channel, 14 feet; to 
mile 13.4 (Leeville bridge), 10 feet; to mile 21.9 
(Golden Meadow), 8 feet; to mile 39.1 (Larose bridge), 
8 feet; (April 1969) to mile 58.2 (Raceland bridge), 5 
feet; to mile 73.4 (Thibodaux bridge), 6 feet. 
Total cost of existing project to June 30, 1970, was 
$1,926,205, of which $1,169,229 was for new work and 
$756,976 for maintenance. In addition, $75,563 was 
expended for rehabilitation (Code 820). 
The Greater Lafourche Port Commission requested, 
and was granted a permit to dredge a new channel 20 
by 300 feet wide west of the existing channel from mile 
0.76 in Bayou Lafourche to the 20-foot depth in the 
gulf, and to close the existing jettied channel after 
completion of the new channel. This work was 
completed in March 1968 and the Port Commission 
must maintain the channel at no less than 12 by 125 
feet. 
6. BAYOUS LA LOUTRE, ST. MALO, 
AND YSCLOSKEY, LA. 
Location. From their common head at the small 
settlement of Yscloskey, Bayou La Loutre flows 
southeasterly 29.4 miles to Eloi Bay, and Bayou 
Yscloskey northeasterly 2.2 miles to Lake Borgne. 
Bayou St. Malo leaves Bayou La Loutre at mile 19.4 
flowing northwesterly 6.5 miles to Lake Borgne. (See 
Coast and Geodetic Survey Charts 1270 and 1271, and 
Geological Survey maps, Shell Beach, Lake Eloi, Lake 
Eugenie, and Morgan Harbor quadrangles.) 
Existing project. A channel 5 by 40 feet from deep 
water in Lake Borgne to shoreline at mouth of Bayou 
Yscloskey; a channel 6 by 40 feet from deep water in 
Lake Borgne through Bayous St. Malo, La Loutre, and 
Bayou Eloi to deep water in Lake Eloi; a channel 5 by 
30 feet in Bayou La Loutre between Hopedale and 
Bayou St. Malo. Length of improvements, 30 miles. 
Normal range of tide, 1 foot; hurricane, 6 feet. Cost of 
constructing project was $96,916. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Hired labor 
conducted condition surveys and investigations. Plans 
and specifications for maintenance dredging of bar 
channels have been prepared but work could not be 
advertised because of problems relating to spoil-disposal 
areas and oyster leases. 
Condition at end of fiscal year. Construction of project 
was initiated in fiscal year 1940 and completed in May 
1956. Controlling depths, mean low gulf: Bayou La 
Loutre (April 1970) bar channel (Lake Eloi), 5 feet; to 
mile 15 (Bayou St. Malo), 5 feet; to mile 21.7 
(Hopedale), 4.5 feet; Bayou St. Malo (January 1970), 
bar channel, 3 feet; to mile 6.3 (Bayou La Loutre), 3 
feet; and Bayou Yscloskey (April 1970), bar channel, 
3.5 feet. 
7. BAYOU QUEUE DE TORTUE, LA. 
Location. Bayou Queue de Tortue rises in the western 
part of Lafayette Parish, La., and flows southwesterly, 
then westerly between Acadia and Vermilion Parishes, 
entering the Mermentau River about 5 miles above the 
head of Lake Arthur. (See U. S. Coast and Geodetic 
Survey Chart No. 1116 and U. S. Geological Survey 
quadrangles Lake Arthur and Gueydan.) The stream is 
50 to 110 feet wide and about 60 miles long. The 
section under improvement is 14 miles long, measured 
through the proposed cutoffs, and extends from the 
mouth to the Southern Pacific Railroad bridge at 
Riceville, La. The stream is tidal. The watershed is 
about 285 square miles. The discharge at low water is 
about 40 second feet. 
Existing project. Provides for the removal of obstructions 
from its mouth to the Southern Pacific 
Railroad bridge at Riceville, La., and for dredging 10 
cutoffs, aggregating 1,765 feet in length, reducing the 
distance from the mouth of the bayou to the bridge to 
383

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
about 14 miles. No channel dimensions were specified. 
Under ordinary conditions the mean range of tide is 
about 5 inches at the mouth and nothing at the head, 
and the extreme range about 10 inches and nothing, 
respectively. During severe rains there is at times a rise 
of 6 feet. New work under the project was completed in 
1923 at a cost of $33,355. 
Local cooperation. Fully complied with. 
Terminal facilities. There are no terminal facilities on 
the bayou other than a warehouse and a small wharf at 
mile 6, which is used principally for shipping rice. 
Landings at the pumping plants are generally made on 
the banks. The terminals are considered adequate for 
existing commerce. There are no public wharves open 
for use of all carriers on equal terms. (For a full 
description of terminal facilities, see H. Doc. 652, 66th 
Cong., 2d sess.) 
Operations and results during fiscal year. Clearing and 
snagging of the bayou, started by hired labor last fiscal 
year, was completed August 8, 1969. Both banks of the 
bayou were cleared from mile 0 to mile 14. 
Condition at end of fiscal year. Construction was initiated 
in 1915 and completed March 1923. Controlling 
depth, mean low gulf: (July 1969) mile 0 to 6.5, 6.5 
feet; to mile 13.9, 4 feet. 
8. BAYOU SEGNETTE WATERWAY, LA. 
Location. Bayou Segnette Waterway is a natural 
water traffic route, located in the lowlands of Jefferson 
Parish, La., just south of the Mississippi River, opposite 
New Orleans. The waterway heads at the mouth of an 
artificial canal known as Company or Westwego 
Canal, and ends where Bayou Villars is cut by the 
Intracoastal Waterway. The channel prior to improvement 
included or traversed in turn, Bayou 
Segnette, Bayou Bordeaux, Lake Salvador, and Bayou 
Villars, and is 13.5 miles long. 
Existing project. The plan of improvement provides for 
a channel dredged to a depth of 9 feet below mean low 
Gulf level over a bottom width of 60 feet, commencing 
at the southern end of Company Canal and following 
the existing channel of Bayou Segnette (including its 
cut-offs) southward to approximately mile 6.4; thence 
southerly via a new landcut lying to the east of Lake 
Salvador to Bayou Villars. The total length of 
improvement is 12.2 miles. 
The channel is to be maintained to a depth of 6 feet 
until such time as, in the discretion of the Chief of 
Engineers, maintenance to a greater depth not to 
exceed 9 feet is economically advisable. 
The estimate of cost (revised in 1957) is $374,000. 
Local cooperation. Local interests are required to: 
furnish without cost to the United States all lands, 
easements, rights-of-way and suitable spoil-disposal 
areas necessary for the new work and for subsequent 
maintenance when and as required; accomplish and 
maintain without cost to the United States all 
necessary alterations in pipelines, and drainage and 
other facilities; hold and save the United States free 
from damages due to construction and maintenance of 
the improvements; maintain Company Canal free 
from vegetative growth obstructive to navigation and 
provide and maintain therein a minimum depth of 7 
feet or a depth equivalent to that maintained in the 
Federal channel, whichever is the lesser, for a width of 
at least 30 feet, with transit at published rates open to 
all on equal terms; provide and maintain a public 
wharf, not less than 20 feet wide and 200 feet long near 
the head of Bayou Segnette, accessible by highway and 
open to all on equal terms; and cooperate with the 
Corps of Engineers in preventing the release of water 
hyacinths and other growths obstructive to navigation 
from local drainage ditches into the proposed improvement. 
Assurances of local cooperation accepted on August 
20, 1956. 
Local interests have not conveyed acceptable easements 
to the United States. In July 1966, the Chief of 
Engineers advised the District Engineer that he is not 
authorized to contract for any future construction in 
the project unless prior thereto acceptable land 
interests are obtained and made available to the 
United States. 
Terminal facilities. None. 
Operations and results during fiscal year. Maintenance by 
hired labor consisted of surveys and planning for 
dredging to restore project channel. 
Condition at end of fiscal year. Construction was initiated 
January 10, 1957, and is 64 percent complete. 
Work remaining to complete the project consists of 
deepening the channel to 9 feet when economically 
justified. 
Controlling depths, mean low gulf, were: (Oct. 
1969), GIWW to mile 12.2, 5 feet. 
9. BAYOU TECHE AND VERMILION 
RIVER, LA. 
Location. Bayou Teche has its source in Bayou 
Courtableau, in St. Landry Parish, and flows southeasterly 
125 miles to its confluence with lower 
Atchafalaya River, about 10.5 miles above Morgan 
City, La. Vermilion River, also called Bayou Vermilion, 
is formed by junction of Bayous Fusilier and 
Bourbeau, west of Arnaudville, La., and flows southwesterly 
72 miles to western end of Vermilion Bay. 
Bayou Teche is connected with Vermilion River by 
Bayou Fusilier at Arnaudville; and by Ruth Canal, an 
artificial, privately owned, nonnavigable waterway, 
constructed for diversion of water from Bayou Teche to 
Vermilion River for rice irrigation. (Coast and 
Geodetic Survey Charts 1116 and 1277; Mississippi 
River Commission alluvial valley maps; and Geological 
Survey maps.) 
Existing project. A navigable channel 51 miles long 
and 8 by 80 feet from 8-foot depth contour in 
384

NEW ORLEANS, LA., DISTRICT 
Vermilion Bay to Gulf Intracoastal Waterway, thence 
9 by 100 feet to head of navigation (mile 52) at 
Lafayette, La. (fixed bridge at Louisiana State Highway 
729, formerly State Highway 1092), with additional 
enlargement below Abbeville necessary to 
provide adequate capacity for floodflows; improvement 
of Vermilion River from Lafayette, La., 
mile 52, to its juction with lower end of Ruth Canal, 
mile 57.2 by both widening and deepening to provide a 
channel 6 by 60 feet, mean gulf level, in order to 
provide adequate capacity for flood discharges from 
upper Vermilion River Basin, and also serve irrigation 
interests by conducting flow of Ruth Canal to lower 
Vermilion River during rice season. Clearing and 
enlargment of channel from Ruth Canal to Bayou 
Fusilier by both widening and deepening to provide a 
cross section about 50 percent larger than that of 
existing channel. This improvement is required in 
interest of flood control in upper Vermilion basin. 
Enlargement of channel of Bayou Teche from its head 
in Bayou Courtableau to a point about 21 miles 
downstream thereof, by widening and deepening to 
provide a channel of 35-foot bottom width at minus 2 
and minus 3, mean gulf level. Increasing height of 
Keystone Dam by 3 feet (later revised to 1.5 feet) by 
installation of a fixed crest spillway. (See individual 
report for Bayou Teche, La.) In connection with these 
improvements, the project also provides for replacement 
of an existing pontoon bridge at Woodlawn 
over Vermilion River with a vertical-lift structure and 
lengthening and strengthening approaches to five 
existing movable bridges over Vermilion River below 
Lafayette, La., located at Louisiana State Highway 43 
at Perry, La.; Southern Pacific Railroad at Abbeville, 
La.; Louisiana State Highway 25 at Abbeville, La.; 
Milton, La.; and U.S. Highway 90 (Pinhook bridge) 
just below Lafayette, La. Similar work on existing fixed 
spans over nonnavigable streams is provided for on 11 
bridges over Bayou Vermilion above Lafayette, La., 
and three over upper Bayou Teche. New work 
completed in 1957 cost $2,891,922. Prect was reclassified 
"Operation and Maintenance, General" 
under category, "Navigation (Locks, Dams, Reservoirs, 
and Canals)" by authority of Chief of Engineers, 
April 23, 1956. 
Local cooperation. Fully complied with for new work. 
No action is presently being taken by local interests to 
acquire remaining rights-of-way for maintenance. 
Operations and results during fiscal year. Hired labor 
continued cooperative stream gaging, engineering 
studies, and planning for recreational development. 
Condition at end offiscalyear. Construction commenced 
March 1944 and was completed March 1957, when 
Keystone Dam was raised to provide an increase of 1.5 
feet in pool elevation, in order to increase flow through 
Ruth Canal into Vermilion River. This work was 
accomplished under navigation improvement "Bayou 
Teche, La." 
Controlling depths, mean low gulf: (Aug. 1969) over 
bar, 8 feet; to Gulf Intracoastal Waterway, 11 feet; to 
mile 25.45 (Abbeville), 10 feet; to mile 40, 8 feet; and to 
mile 50 (Pinhook bridge), 5 feet. 
10. BAYOU TECHE, LA. 
Location. Has its source in Bayou Courtableau, in St. 
Landry Parish, flows southeasterly for 125 miles, and 
joins lower Atchafalaya River about 10.5 miles above 
Morgan City, La. (See Coast and Geodetic Survey 
Chart 1116, Mississippi River Commission alluvial 
valley maps, Palmetto, Opelousas, Carencro, Arnaudville, 
St. Martinville, Loreauville, Derouen, 
Jeanerette, Foster, and Belle Isle quadrangles.) 
Previous projects. For details see page 569, 1963 
Annual Report. 
Existing project. Provides for a channel 8 feet deep and 
80 feet wide on the bottom from mouth of stream to 
New Iberia, La., mile 54.5 thence 6 feet deep and 60 
feet wide on the bottom to Keystone lock, 18 miles, and 
thence 6 feet deep and 50 feet wide on the bottom from 
Keystone lock to Arnaudville, La., 34 miles, to be 
secured by dredging, removing snags and overhanging 
trees, and construction of a lock and dam and 
regulating works. (See Table 11-C on Keystone lock.) 
Raising pool level by 1.5 feet above Keystone Dam 
by installation of a fixed crest spillway on dam is 
provided for in flood control project for Bayou Teche 
and Vermilion River, La. Under project, flood control, 
Mississippi River and tributaries, East and West 
Calumet floodgates, with a width of 45 feet and sill 
elevation of minus 9.02 feet, mean low gulf level, were 
constructed in Bayou Teche at east and west approaches 
to Wax Lake Outlet from February 1949 to 
September 1950, and a lock was constructed in lower 
Atchafalaya River in vicinity of Berwick, La., from 
November 1948 to September 1951. (See 11-C on 
Berwick lock.) 
Normal range of tide is 10 inches at mouth; 4 inches 
just below Keystone lock; extreme, 12 inches at mouth; 
6 inches just below Keystone lock; and zero above lock. 
Due to freshets, 4 to 5 feet at mouth; 12 to 15 feet just 
below Keystone lock, and 2 to 7 feet above Keystone 
lock. 
Estimated cost for new work (1954) is $1,080,000, 
exclusive of amount expended on previous projects and 
estimated cost (1954), $371,400 for widening and 
deepening channel between miles 50.06 and 72, 
Keystone lock and dam, which is inactive. 
Local cooperation. Fully complied with. 
Terminal facilities. Small, privately owned wharves are 
available at all towns along bayou; public landing is 
permitted without charge. There are privately owned 
terminals for transferring crude oil to barges near 
towns of Charenton, Jeanerette, Oliver, and St. 
Martinville. Facilities considered adequate for existing 
commerce. 
385

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. Hired labor 
continued operation and maintenance of Keystone 
lock and facilities and condition and operation studies. 
Dewatering lock to install new timber gates at south 
end and make miscellaneous repairs was started April 
27, 1970, and is about 52 percent complete. The lock 
was closed to navigation June 8, 1970, and will be 
opened when repairs are complete. 
Condition at end of fiscal year. Construction was initiated 
in 1891 and completed July 1928, except widening 
channel to bottom width of 80 feet from mile 50.06 to 
New Iberia, and to bottom width of 60 feet from New 
Iberia to Keystone lock, which is inactive. For further 
details see Annual Report for 1966. 
Controlling depths, mean low gulf: (Sep. 1969) mile 
0 to 4.5, 4 feet; to mile 27 (Baldwin bridge), 6 feet; to 
mile 32 (Charenton bridge), 11 feet; to mile 37 
(Adeline bridge), 8 feet; and to mile 50 (New Iberia), 5 
feet. 
Total cost under existing project to June 30, 1970, 
was $2,755,909 of which $708,626 was for new work, 
$1,217,649 for maintenance, and $829,634 for operating 
and care, including $91,389, permanent 
indefinite appropriation. 
11. CALCASIEU RIVER AND PASS, LA. 
Location. Calcasieu River has its source in southwestern 
Louisiana, and flows generally southerly to the 
gulf. About 25 miles from the gulf it debouches into 
Calcasieu Lake, which is about 18 miles long. 
Connection between lake and gulf, about 7 miles long, 
is known as Calcasieu Pass. (See Coast and Geodetic 
Survey Charts 591 and 592; Geological Survey maps, 
Edna, Thompson Bluff, Hecker, Moss Bluff, Lake 
Charles, West Lake, Moss Lake, Hackberry, Sweet 
Lake, Brown's Lake, Holly Beach, Grand Bayou, and 
Cameron quadrangles; and Corps navigation maps of 
Intracoastal Waterway and Atchafalaya River system.) 
Previous project. For details see 1936 and 1938 Annual 
Reports, pages 719 and 819, respectively. 
Existing project. Provides for a channel 40 by 400 feet 
(35.9 miles long) from Lake Charles to sea end of jetties 
in Gulf of Mexico; an approach channel 42 by 800 feet 
from sea end of jetties to 42 feet deep in the gulf; 
extension of 35- by 250-foot channel from its present 
upstream limit at mile 34 to vicinity of U. S. Highway 
90 Bridge (mile 36.2); a 750- by 1,000-foot turning 
basin at upper end with a 35-foot depth; improvement 
of river from Lake Charles to Phillips Bluff (52.6 miles) 
by removing logs, snags, overhanging trees, and by 
dredging; maintenance of existing 12- by 200-foot 
channel in old channel of Calcasieu River at Cameron, 
La., which connects with project at mile 2.25; and 
reconstruction and extension of existingjetties initially 
to seaward end of east jetty, and further extension to 
15-foot depth contour if found advisable to reduce 
maintenance dredging costs. Improvement is 113.6 
miles long. Normal range of tide is 10 inches at mouth, 
diminishing to zero at Phillips Bluff, extreme range is 
14 inches and zero, respectively. 
Cost of existing project, completed in 1968, except 
for extension of jetties, if necessary, to 15-foot-depth 
contour, was $27,311,396. Estimated cost of this 
extension (July 1967) is $10,300,000. Estimated non- 
Federal cost of the existing project is $3,240,000. In 
addition, Coast Guard is to provide navigation aids at 
an estimated cost of $427,000. 
Local cooperation. Local interests furnished all rightsof-
way and spoil disposal areas for completed features. 
For construction and future maintenance of modification 
authorized by 1960 River and Harbor Act, 
local interests must furnish lands, rights-of-ways, and 
spoil-disposal areas; alter pipelines, cables, wharves, oil 
wells, and any other facilities and hold the United 
States free from damages. Assurances were accepted 
and right-of-entry furnished for the modification. The 
local agency is presently effecting transfer to the 
United States the few remaining tracts with acceptable 
title evidence. 
Terminal facilities. Facilities at Port of Lake Charles 
are owned by Lake Charles Harbor and Terminal 
District and operated by a board of commissioners. In 
addition to municipally owned terminals, there are 
several privately owned and operated wharf structures 
on existing ship channel. (For further details, see Port 
Series No. 19, vol. 1, "Port St. Joe, Fla., Pensacola, Fla., 
Baton Rouge, La., Panama City, Fla., Pascagoula, 
Miss., Lake Charles, La., Gulfport, Miss." revised 
1957, and Folio of Navigation Maps Intracoastal 
Waterway, New Orleans to Port Arthur, 1962, 10th 
edition, published by Mississippi River Commission.) 
Operations and results during fiscalyear. 
Maintenance by hired labor consisted of condition 
and operation studies, operation and maintenance of 
the salt-water barrier, and maintenance dredging by 
the dredge Langfitt. The dredge Langfitt removed 
7,982,000 cubic yards of shoal between miles 0 and 
minus 10 in restoring channel during the period 
November 6 to 27, 1969, and February 5 to April 8, 
1970. 
Maintenance by contract consisted of restoring the 
channel from miles 15.5 to 29.7. Preliminary work was 
started in the previous fiscal year and completed April 
20, 1970, with the contract dredges Galveston, Louisiana, 
and Buster Bean removing 10,906,958 cubic yards this 
fiscal year. Restoration of the 12- by 200-foot channel to 
Cameron was initiated in the previous fiscal year by the 
contract dredge Galveston and completed July 6, 1969, 
with the removal of 49,320 cubic yards this fiscal year. 
Condition at end of fiscal year. Construction under the 
existing project was initiated in fiscal year 1939 and 
completed October 1968, except extension of the jetties 
to 15-foot depth contour, if necessary. 
See table ll-d at end of chapter for work accomplished 
under each modification. 
386

NEW ORLEANS, LA., DISTRICT 
A turning basin or ship anchorage for vessels using 
waterway was constructed from April to June 1952, 
between St. Johns Island and vicinity of Cameron, La., 
about 1.1 miles. Calcasieu Pass jetties, initiated under 
previous project and completed in May 1942, extended 
to 10-foot depth contour. East jetty, about 8,620 feet 
long, was built to about 6 feet above mean low gulf, and 
extends seaward from existing gulf shoreline for 6,820 
feet. West jetty, 8,050 feet long, was built to about 4 feet 
above mean low gulf and extends seaward from 
existing gulf shoreline for 6,795 feet. 
Controlling depths, mean low gulf: (Feb. 1970) bar 
and jetty channel, 40 feet; to Lake Charles, 38 feet; to 
mile 38.7 (salt-water barrier), 14 feet; to mile 60, 9 feet; 
to mile 85.9, 0 feet; (Aug. 1969) to Cameron, 13 feet. 
Subsequent to these surveys, the project channel was 
restored as above indicated. 
Total cost of existing project to June 30, 1970, was 
$40,399,524, of which $27,311,396 was for new work 
and $13,088,128 for maintenance. In addition, 
$107,837 was expended for minor rehabilitation (Code 
820). 
12. CALCASIEU RIVER SALT-WATER 
BARRIER, LA. 
Location. Just upstream of Lake Charles, La. 
Existing project. Provides for salt-water barrier structure 
with five tainter gates in a new bypass channel; a 
parallel channel with a navigation gate (sector type); a 
closure dam in existing channel of Calcasieu River; 
and revetment along a section of river bank upstream 
from diversion channel to prevent a natural cutoff. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Hired labor 
forces partially completed preparation of operations 
and maintenance manual for the project. Operation 
and maintenance of the structures and channels was 
accomplished under the allotment for Calcasieu River 
and Pass, La. 
Condition at end offiscalyear. Construction was initiated 
April 26, 1965, and completed March 27, 1968, except 
bank stabilization which may be required at a later 
date. 
13. FRESHWATER BAYOU, LA. 
Location. In Vermilion Parish, La., between Atchafalaya 
and Calcasieu Rivers, from Gulf Intracoastal 
Waterway, mile 161.2 west of Harvey lock, 
to 12-foot contour in Gulf of Mexico near Freshwater 
Bayou. Waterway is routed 22.6 miles along Schooner 
Bayou Cutoff, Schooner Bayou, Six Mile Canal, Belle 
Isle Canal, and Freshwater Bayou. 
Existing project. Provides for dredging a new 12- by 
125-foot channel from Gulf Intracoastal Waterway, 
mile 161.2 west of Harvey lock, to 12-foot contour in 
Gulf of Mexico near Freshwater Bayou, construction of 
an 84- by 600-foot lock with a depth of 16 feet over sill 
near Gulf of Mexico; and construction of jetties from 
shoreline to 6-foot depth contour in Gulf of Mexico, if 
maintenance dredging of channel without jetties proves 
to be more expensive than construction and maintenance 
of jetties. Until such determination has been 
made, offshore channel should be dredged and 
maintained to provide a 12- by 250-foot channel. In 
event jetties are provided, offshore section should then 
be maintained to 12- by 125-foot project in jettied 
reach, and 250 feet beyond. Cost of existing project, 
completed in 1968, except for construction of jetties at a 
later date, if necessary, was $7,116,224 Federal and a 
$16,060 cash contribution. Estimated cost of construction 
of jetties (July 1967) is $2,248,000. Estimated 
non-Federal cost for the existing project is $206,000. In 
addition, Coast Guard is to provide navigational aids 
at an estimated cost of $23,000. 
Local cooperation. Fully complied with. 
Terminal facilities. Extensive public and private 
terminal and transfer facilities do not exist in area, and 
none would be required for improved channel. Private 
terminals exist at site of oil and gas operations in area 
and sufficient private and public wharf facilities are 
along Gulf Intracoastal Waterway and its connecting 
waterways. Sites are available along proposed improvement 
for construction of any additional private 
and public terminals that might be required for 
utilization of channel. 
Operations and results during fiscal year. Maintenance by 
hired labor consisted of operation and ordinary repairs 
o lock, condition and operation studies, and preparation 
of plans and specifications for maintenance 
dredging of channel. 
Condition at end of fiscal year. Construction was initiated 
April 1963 and completed August 1968, except for 
construction of jetties at a later date, if required to 
reduce the cost of maintenance dredging. 
14. GULF INTRACOASTAL WATERWAY 
BETWEEN APALACHEE BAY, FLA., 
AND MEXICAN BORDER (NEW 
ORLEANS DIST.) 
Location. Section of Gulf Intracoastal Waterway 
within New Orleans District extends from Lake Borgne 
Light 29 near mouth of Rigolets, to Sabine River, La., 
and Tex. Section from Lake Borgne Light 29 to 
Mississippi River follows Rigolets and Lake Pontchartrain 
to lake end of State-owned Inner Harbor 
navigation canal, thence via this canal to Mississippi 
River, a distance of 40.5 miles. Public Law 675, 77th 
Congress, modified project to provide for a landcut 
through marsh from Rigolets to a point on Inner 
Harbor navigation canal about 2.25 miles from 
Mississippi River, eliminating passage through Lake 
Pontchartrain and five drawbridges, a distance of 30.8 
miles to Mississippi River by this route. From Inner 
Harbor navigation canal to entrance to Harvey lock, 
route follows Mississippi River for 5.5 miles. Section 
387

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
from Mississippi River to Atchafalaya River, La., 
leaves Mississippi River through Harvey lock about 3.3 
miles above Canal Street and follows Harvey Canal 
No. 1 and Bayou Barataria to Bayou Villars, a landcut 
south of Lake Salvador to Harvey Canal No. 2, Harvey 
Canal No. 2 to Larose, La., and a landcut to Houma, 
La., thence over a landcut south of Bayou Black and 
Bayou Cocodrie, thence through Bayou Cocodrie and a 
landcut to Bayou Black; thence through Bayou Black, 
Bayou Chene, and Bayou Boeuf to Atchafalaya River, 
about 0.5 mile south of Morgan City, La., a total of 
95.5 miles. Alternative connection with Mississippi 
River in vicinity of Algiers, La., about 10.3 miles below 
Harvey lock, consisting of a lock and landcut about 9 
miles long intersecting Intracoastal Waterway at about 
mile 6, is complete. An alternative route from 
Mississippi River follows Bayou Plaquemine passing 
Indian Village, La., and continuing on through lower 
Grand River to and through a lock at Bayou Sorrel in 
East Atchafalaya basin protection levee, thence 
through levee borrow pit to Berwick Bay; and thence 
through Berwick Bay to Morgan City, La., a total of 56 
miles. This alternative route was enlarged from vicinity 
of Morgan City to Indian Village, La., and extended 
from Indian Village, La., through Bayou Grosse Tete 
and a new landcut to and through a new terminal lock 
and entrance channel to Mississippi River in vicinity of 
Port Allen, La., a total of 65 miles. Section from 
Atchafalaya River to Vermilion River, La., begins at 
western end of Mississippi-Atchafalaya section and 
follows Atchafalaya River about 2.5 miles, portions of 
Little Wax Bayou, Possum Bayou, cutoffs, a landcut 
passing through North Bend Plantation to Bayou 
Bartholomew, Bayou Bartholomew to Little Bay, a 
landcut skirting north edge of Cote Blanche Island and 
west edge of Weeks Island to Vermilion River, about 24 
miles below Abbeville, La., a total of about 63.6 miles. 
Franklin Canal, St. Mary Parish, La., extends southwesterly 
from Franklin, La., on Bayou Teche, for 5.5 
miles to Bayou Portage, a section of "The Inland 
Waterway from Franklin to the Mermentau River, 
La.," and through bayou for 0.75 mile to Gulf 
Intracoastal Waterway, 121 miles west of Harvey lock. 
Section from Vermilion River to Mermentau River, 
La., begins at western end of Atchafalaya-Vermilion 
section and follows Vermilion River 1.3 miles, a part of 
Schooner Bayou cutoff canal, and a landcut running 
generally northwesterly to Mermentau River at a point 
about 0.5 mile above its entrance into Grand Lake and 
about 16 miles below town of Lake Arthur, La., a total 
of about 42.7 miles. Vermilion lock was constructed 
about 1.75 miles west of Vermilion River to prevent 
ingress of salt water from Vermilion Bay. Section from 
Mermentau River to Calcasieu River, La., begins at 
western end of Vermilion-Mermentau section and 
follows Mermentau River upstream for about 1.5 miles, 
a landcut running west-southwesterly to Lake Misere, 
passing north of lake and Bayou Misere, westerly to 
Sweet Lake, south and west of Sweet Lake, northwesterly 
to Bayou Tete Bois, through Bayou Tete 
Bois, Black Bayou, and cutoffs to a point on Calcasieu 
River about 16.6 miles below city of Lake Charles, La., 
a total of about 37.1 miles. Calcasieu lock was 
constructed near intersection of Calcasieu River and 
Intracoastal Waterway, mile 238 west of Harvey lock, 
Calcasieu Parish, about 16.6 miles below Lake Charles, 
La. Section from Calcasieu River to Sabine River, La. 
and Tex., begins at western end of Mermentau- 
Calcasieu section, and follows Calcasieu River upstream 
about 1.6 miles, a landcut running southwesterly 
2.8 miles, thence west 22 miles to Sabine River 
at a point about 3 miles below Orange, Tex., a total of 
about 27.1 miles. (See Coast and Geodetic Survey 
Charts 878-884, inclusive; Mississippi River Commission 
alluvial valley map and Rigolets, Chef 
Menteur, St. Bernard, New Orleans, Barataria, Baton 
Rouge, Grosse Tete, Chicot Lake, Foster, Napoleonville, 
Morgan City, Belle Isle, Bayou Sale, 
Jeanerette, and Derouen quadrangles; Geological 
Survey maps, Cutoff, Houma, Gibson, Abbeville, 
Forked Island, Grand Lake East, Grand Lake West, 
Lake Charles, Sulphur, and Orange quadrangles; and 
folio of navigation maps of Intracoastal Waterway, gulf 
section, Port Arthur, Tex., to New Orleans, La.) 
Previous projects. For details see page 544 of 1963 
Annual Report. 
Existing project. Provides for a waterway 384.1 miles 
long within the district, 16 feet deep and 150 feet wide, 
from Mississippi River to Atchafalaya River, except in 
vicinity of Houma, mile 50.5 to 63.5, which is to be 
maintained at 12 by 125 feet; a channel 16 by 150 feet 
through bypass route around Houma, La., mile 50.5 to 
63.5, and through alternative connection in Mississippi 
River below Algiers, La., about 9 miles long, a channel 
16 by 200 feet from Atchafalaya River to Sabine River; 
a channel 12 by 150 feet in section between Lake 
Borgne Light No. 29 and New Orleans (via landcut 
through marsh and Inner Harbor navigation canal), 
33.1 miles long; an alternative route 9 feet deep by 100 
feet wide between Lake Borgne Light No. 29 and New 
Orleans (via Rigolets, Lake Pontchartrain, and Inner 
Harbor navigation canal), 40.5 miles long; a channel 
12 feet deep and 125 feet wide for Plaquemine-Morgan 
City alternative route from Mississippi-Atchafalaya 
section of waterway, in vicinity of Morgan City, 
through Lower Atchafalaya River (Berwick Bay) and 
borrow pit of East Atchafalaya protection levee to and 
through Bayou Sorrel lock which was constructed 
under existing project "Flood control, Mississippi River 
and tributaries," thence through Lower Grand River 
to Indian Village, and thence by way of Bayou Grosse 
Tete and a new landcut to and through a new terminal 
lock and entrance channel to Mississippi River in 
vicinity of Port Allen, La., opposite lower limit of Port 
Baton Rouge; a channel 9 feet deep and 100 feet wide 
from Indian Village on Plaquemine-Morgan City 
alternative route through Bayou Plaquemine and 
Plaquemine lock to Mississippi River at Plaquernine, 
388

NEW ORLEANS, LA., DISTRICT 
La., improvement of Franklin Canal as a connecting 
channel from Gulf Intracoastal Waterway (mile 121) 
to Franklin, La., to afford a channel 8 feet deep and 
generally 60 feet wide with a width of 100 feet in its 
upper 300 feet; and a salt-water guard lock (Calcasieu 
lock) in waterway at mile 238 west of Harvey lock. 
Project also provides for: widening at bends; passing 
places; mooring basins; locks or guard locks; such 
railroad bridges over artificial cuts as are necessary; 
purchase of pipeline dredge; construction and operation 
of new drainage canals and pumping facilities 
to restore parish drainage systems where intercepted; 
construction of movable bridges at Missouri Pacific 
Railroad and State Highways 31 and 996 (in lieu of 
State Highway Bridge 31, a tunnel was constructed, 
and additional cost over estimated cost of bridge was 
borne by local interests); fixed-trestle bridges for 
crossing proposed landside drainage canals; lift bridges 
at Louisiana Highway 168, Port Allen, La., at Texas & 
Pacific Railway, Port Allen, La., and at Texas & 
Pacific Railway, Morley, La.; and for annual payments 
to Board of Commissioners of Port of New 
Orleans for use of a portion of Inner Harbor navigation 
canal. Length of waterway within district is 384.1 miles 
via northerly or Port Allen route, and 229.4 miles via 
southerly or Harvey Canal route. Normal range of tide, 
10 inches; extreme range, 14 inches. A severe storm 
may cause a high tide of from 6 to 9 feet. 
Estimated cost for new work, exclusive of amounts 
expended on previous projects, is $98,193,827 Federal 
and $15,242,000 non-Federal, divided as follows: 
Algiers lock and canal, completed June 1961, 
$15,895,924 Federal, and $2,185,000 non-Federal; 
Plaquemine-Morgan City route, completed October 
1963, $26,869,372 Federal, and $2,250,000 non-Federal; 
and remainder of waterway (July .1970), 
$55,428,531 Federal and $10,807,000 non-Federal, 
including $32,600,000 Federal and $10,800,000 non- 
Federal for modification of October 1962, and 
$7,360,000 Federal and $7,000 non-Federal for replacement 
of Vermilion Lock. In addition, the Coast 
Guard is to provide navigation aids at an estimated cost 
of $66,000. 
Construction of bulkheads and jetties at Lake 
Borgne and Chef Menteur, La., is considered inactive 
and excluded from foregoing cost estimate. Estimated 
cost (1956) of this item is $440,000. Construction of a 
double-leaf bascule, four-lane highway bridge provided 
for under this project has become unnecessary 
because portion of project over which bridge was to be 
constructed was incorporated in project "Mississippi 
River-Gulf Outlet" which provides for a larger bridge. 
Bayou Sorrel and Bayou Boeuf locks were constructed 
and are being maintained and operated with flood 
control, Mississippi River and tributaries, funds. 
Therefore, construction, maintenance, and operation 
costs are not included in approved estimates referred to 
before. 
(See table ll-E at end of chapter for locks on Gulf 
Intracoastal Waterway in New Orleans District.) 
Local cooperation. Algiers lock and canal: All assurances 
required for construction were furnished. Local agency 
has failed to convey all fee and easement tracts with 
acceptable title evidence to the United States. However, 
authority has been received to accept the interests 
conveyed as best available from local agency with the 
understanding that the United States rely upon 
assurances of local cooperation should any claims 
against the United States occur as a result of failure of 
local agency to complete transfer of title. Plaquemine- 
Morgan City alternative route: All assurances required for 
construction were furnished. Title by United States has 
been acquired to all but 35 tracts, for which local 
agency failed to comply fully with curative requirements 
in title certificate. Authority was given to 
accept the tracts conveyed as best available from local 
interests and to rely upon assurances of local cooperation 
furnished by local agency should any claims 
against the United States occur as a result of failure of 
local agency to complete transfer of title. 
Modification authorized by River and Harbor Act of 
1962: Local interests must furnish lands, rights-of-way, 
and spoil-disposal areas for enlargement and future 
maintenance of project, make alterations to utilities; 
construct, maintain, and operate all bridges desired in 
connection with bypass channel around Houma, La.; 
and hold the United States free from damages. 
Assurances were requested in April 1963; however, 
none of 11 local agencies involved has furnished 
assurances requested. Main objection to participation 
is requirement that local interests be responsible for 
alteration of utilities. Assurances of local cooperation 
for the replacement of the existing Vermilion lock were 
requested of the Vermilion Parish Police Jury on 
September 10, 1968. The Police Jury, by letter dated 
April 9, 1969, has indicated its willingness and 
capability of providing the requirements of local 
cooperation for the project, when funds are available. 
Terminal facilities. Large terminal and transfer facilities, 
suitable for receiving and shipping commodities 
by barge, are available at principal cities in Louisiana; 
namely, New Orleans, Baton Rouge, Harvey, Morgan 
City, and Lake Charles. Facilities at New Orleans are 
on Inner Harbor navigation canal. Canal and facilities 
were leased from Board of Commissioners, Port of New 
Orleans, April 1, 1944, and are now operated by the 
United States, toll free, 24 hours per day. At Morgan 
City, on Atchafalaya River, there are two large and 
three small wharves open to all without charge. 
Otherwise facilities are confined to privately owned 
piers, wharves, or oil docks. Facilities considered 
adequate for existing commerce. 
Operations and results during fiscal year. New work by 
hired labor: Surveys, borings, and entrance alinement 
have been complete for the replacement of Vermilion 
lock. The general design memorandum is about 50 
percent complete. Maintenance by hired labor: Real 
389

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
estate activities, condition and operation studies, noncooperative 
stream gaging, investigation and surveys, 
condition surveys, and channel patrol continued. 
Locks, bridges, and waterways were operated and 
maintained. Fender systems were repaired at Calcasieu, 
Harvey, Port Allen, and Vermilion locks. The 
bulkhead at the Conely property in vicinity of Houma, 
La., was repaired between April 7 and 10, 1970. 
Installation of fire protection system at Port Allen 
lock was started September 23, 1969, and completed 
March 26,1970. 
Placement of riprap for bank protection at Algiers 
and Harvey locks, initiated June 10, 1969, was 
completed August 12, 1969. 
Maintenance by contract: St. Claude and Florida 
Avenue bridges were repaired during the periods 
November 10 to 24, 1969, and February 2 to 20, 1970, 
respectively. 
Dredging included restoring 7.9 miles of the main 
stem channel intermittently from mile 20.1 to mile 
193.7 west of Harvey during the period December 5, 
1969, to April 7, 1970, by the dredges Tchefuncta and 
Paul F. Jahncke. Shoal was removed from the forebays at 
Inner Harbor navigation canal, Harvey, Port Allen 
and Algiers locks. The dredge Arkansas removed 79,325 
cubic yards between August 30 and 31, from Inner 
Harbor lock forebay, 24,550 cubic yards between 
August 6 and 8 from Harvey lock forebay, and 80,000 
cubic yards between June 28 and 30 from Port Allen 
lock forebay. The dredge Vicksburg removed 65,725 
cubic yards from Algiers lock forebay during the period 
August 7 to 12, 1969. Dredging below Bayou Sorrel 
lock consisted of removing 64,911 cubic yards by the 
dredge Holland during the period August 9 to 15, 1969. 
Condition at end offiscalyear. Construction was initiated 
July 1929 and project as modified is 59 percent 
complete. 
For information on completion of segments of 
waterway, see 1965 Annual Report, pages 523 and 524. 
Work remaining to complete the project consists of 
enlarging waterway as provided by 1962 River and 
Harbor Act, and replacement of Vermilion lock. 
Construction of bulkheads at Lake Borgne and Chef 
Menteur are inactive features as this work has not been 
necessary. 
Controlling depths, mean low gulf: (Jan. 1970) New 
Orleans to Lake Borgne, 12 feet; (Jan. 1970) Mississippi 
River to Sabine River, 12 feet; Algiers 
alternative route, 12 feet; (Oct. 1970) Morgan City- 
Port Allen alternative route, 12 feet. Subsequent to 
March 1967 survey, project channel was restored as 
above indicated. 
Total cost of existing project to June 30, 1970, was 
$110,858,841 of whibh $58,306,088 was for new work, 
$24,979,153 for maintenance, and $27,573,600 for 
operation and care of locks and bridges. In addition, 
$340,159 for new work and $7,005 for maintenance was 
expended from contributed funds. 
15. HOUMA NAVIGATION CANAL, 
LOUISIANA 
Location. Extends from Gulf Intracoastal Waterway 
at mile 59.5 west of Harvey lock southerly anout 16 
miles, thence southeasterly 10.5 miles to Terrebonne 
Bay, and 9.5 miles across bay to deep water in Cat 
Island Pass. At mile 11.3 above Cat Island Pass, 
Houma navigation canal crosses Bayou Petit Caillou 
and 20 miles above Cat Island Pass it crosses Bayou 
Grand Caillou. No other major waterways are crossed 
by Houma navigation canal. (See Army Engineer and 
Geological Survey quadrangle maps; Coast and 
Geodetic Survey Charts 1050, 1116, and 1116A; and 
Coast and Geodetic Charts 1274 and 1275, and sheet 7 
of "Navigation Maps of Intracoastal Waterway, Gulf 
Section, New Orleans, La., to Port Arthur, Texas," 
published by Mississippi River Commission.) 
Existing project. Provides that United States assume 
maintenance and operation of Houma navigation 
canal, constructed by Parish of Terrebonne, to dimensions 
of 15 by 150 feet. Normal range of tide is 10 
inches at mouth and 4 inches at Houma; extreme 
range, 14 inches at mouth and 6 inches at Houma; 
wind and tide, 1 to 3 feet at mouth; flood, 3 to 4 feet in 
upper section. 
Local cooperation. Local interests must furnish lands 
and rights-of-way for maintenance of canal and for 
establishment and maintenance of aids to navigation; 
furnish suitable spoil-disposal areas; provide alterations 
to facilities; hold the United States free from 
damages; and maintain and operate all bridges under 
construction or to be constructed across the canal. 
Local interests (under Chief of Engineers' interpretation 
of H. Doc. 583, 87th Cong., 2d sess.) will 
not be required to convey title of canal to United 
States. Assurances were furnished and accepted April 
12, 1963. Local cooperating body has furnished 
temporary spoil areas as required for maintenance 
dredging of canal. * 
Operations and results during fiscal year. Hired labor 
forces continued routine surveys and condition studies 
and prepared plans and specifications for maintenance 
dredging land cut channel from GIWW to Cat Island 
Pass, not continuous. 
Maintenance by hired labor consisted of restoring 
approximately 1.04 miles of channel at Cat Island Pass, 
mile -2.65 to -3.69, by the U. S. dredge Schweizer during 
the period January 6 to February 3, 1970. 
Condition at end of fiscal year. Maintenance by the 
United States commenced in November 1964. Controlling 
depths, mean low gulf: (Feb. 1970) Gulf 
Intracoastal Waterway to Light 38 (Terrebonne Bay), 
13 feet; to Light 1 and 2 (end of project), 12 feet; Cat 
Island Pass, 14 feet. 
390

NEW ORLEANS, LA., DISTRICT 
16. MERMENTAU RIVER, BAYOU 
NEZPIQUE, AND BAYOU DES 
CANNES, LA. 
Location. Mermentau River is formed by junction of 
Bayous des Cannes and Nezpique, 2.25 miles above 
Mermentau, La., flows southwesterly, and empties into 
the Gulf of Mexico. Bayou Nezpique rises in Evangeline 
Parish, flows southerly and empties into 
Mermentau River. Bayou des Cannes rises in Evangeline 
Parish, flows south-southwesterly and empties 
into Mermentau River. (See Coast and Geodetic 
Survey Charts 1116 and 1278, and Geological Survey 
maps, Evangeline, Hathaway, Mermentau, Jennings, 
Lake Arthur, Gueydan, Thornwell, Latania Lake, 
Catfish Lake, Grand Cheniere, and Bayou Labauve 
quadrangles.) 
Previous project. For details see page 637, 1961 Annual 
Report. 
Existing project. Provides a 12- by 125-foot channel in 
Mermentau River from Gulf Intracoastal Waterway to 
Lake Arthur; a 12- by 200-foot channel through Lake 
Arthur and a 12- by 125-foot channel from upper end 
of Lake Arthur to junction of the Mermentau River 
and Bayous Nezpique and des Cannes; replacement of 
existing Lake Arthur highway bridge over Mermentau 
River with new bridge constructed to current highway 
standards and with vertical and horizontal clearances 
of 50 and 200 feet, respectively; and enlargement and 
realinement of Bayous Nezpique and des Cannes, to 
provide a 12- by 125-foot waterway from Interstate 
Highway 10 to the Mermentau River. Mean range of 
tide on Mermentau River near mouth is 10 inches and 
near head about 3 inches, extreme ranges being 14 and 
5 inches, respectively. Variation of water surface near 
mouth may be as much as 7 or 8 feet, due to hurricanes 
on gulf and near head from 8 to 12 feet, due to freshets. 
Under ordinary conditions, range of tide on Bayous 
Nezpique and des Cannes is about 3 inches at mouth 
and nothing at head. Estimated cost for new work (July 
1970) is $5,280,000 Federal and $1,400,000 non- 
Federal, including a cash contribution of $670,000. In 
addition the Coast Guard is to provide navigation aids 
at a cost of $51,000. 
Local cooperation. Local interests shall agree to: 
provide all lands for construction and maintenance 
and spoil-retaining works or the costs of such works; 
hold the United States free from damage due to the 
project; design and construct a replacement highway 
bridge at Lake Arthur, La.; bear 17.1 percent of the 
costs ($670,000 cash contribution), and operate and 
maintain the bridge; provide and maintain terminal 
facilities; and accomplish and maintain all modifications 
to utilities. 
The improvement of the Mermentau River or of 
Bayou Nezpique or Bayou des Cannes, may be 
undertaken independently as the local cooperation 
therefor is provided, concurrent with, or subsequent to, 
replacement of the Lake Arthur highway bridge. 
Assurances have been furnished by the Acadia, 
Jefferson Davis and Vermilion Parish Police Juries and 
the Louisiana Department of Highways. 
The Cameron Parish Police Jury, in its letter of April 
18, 1969, reaffirmed its previous position that it did not 
desire to execute assurances for the project. The State 
of Louisiana Department of Public Works executed 
partial assurances on March 26, 1968, covering that 
portion of the project in Cameron Parish. That part of 
provision (a) dealing with retaining dikes, bulkheads 
and embankments was eliminated by the Department. 
Terminal facilities. Several small, privately owned 
wharves at Grand Cheniere and a public terminal at 
town of Lake Arthur. Privately owned terminals for 
transferring crude oil to barges are: one on Lake 
Arthur near town of Lake Arthur; one on Mermentau 
River near town of Mermentau; two on Bayou 
Nezpique near Jennings; and four on Bayou des 
Cannes; one near Evangeline, one at Mermentau, and 
two near Jennings. Facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. The general 
design memorandum was completed. Plans and 
specifications prepared by the Louisiana Department 
of Highways for the Lake Arthur, La., bridge replacement 
were reviewed and approved. 
Condition at end of fiscal year. Construction not 
initiated. Total cost of existing project to June 30, 1970, 
was $180,042 for new work. 
17. MERMENTAU RIVER, LA. 
Location. Work covered by this project is 35 to 70 
miles southeast of Lake Charles, La., along lower 
Mermentau River below Grand Lake, mile 25, to Gulf 
of Mexico; Inland Waterway from Vermilion Bay to 
White Lake, White Lake to Grand Lake, and from 
Schooner Bayou to Intracoastal Waterway-gulf section 
(Schooner Bayou cutoff); North Prong of Schooner 
Bayou; and waterway from White Lake to Pecan 
Island, La., and artificial canal, extending from 5-foot 
depth contour in White Lake, almost due south for 
about 1.8 miles to Pecan Island. (See Coast and 
Geodetic Survey Charts 1277 and 1278, and Geological 
Survey maps.) 
Existing project. Flood control, navigation, irrigation, 
and salinity control in coastal marsh of lower Mermentau 
River Basin and channel enlargement of lower 
Mermentau River below Grand Lake, mile 25, to a 
minimum section of 3,000 square feet below mean low 
gulf level for discharge of floodflows; construction of a 
sector gated control structure at Catfish Point, mile 24 
above mouth of Mermentau River, for discharge of 
floodflows and control of tidalflows and salt-water 
intrusion in Mermentau River; channel enlargement 
and realinement of Inland Waterway from Vermilion 
Bay to White Lake, 12.04 miles, and from White Lake 
to Grand Lake, 6.14 miles, to a minimum section of 
3,000 square feet below mean low gulf level or interflow 
391

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
between lakes and discharge of floodflows; construction 
of a sector gated control structure in enlarged channel 
immediately north of abandoned Schooner Bayou lock 
reservation for discharge of floodflows and control of 
tidalflows and salt-water intrusion; channel enlargement 
of North Prong of Schooner Bayou and 
Schooner Bayou cutoff, 6.69 miles, to 6 by 60 feet, 
mean low gulf level, for navigation purposes; and 
maintenance of existing 5- by 40-foot, mean low gulf 
level, waterway from White Lake to Pecan Island, La., 
1.8 miles long, for navigation. In addition, project 
provides for incorporation of that section of project, 
"Inland Waterway from Franklin, La., to Mermentau 
River," west of Vermilion Bay, a waterway that 
includes Schooner Bayou lock. Project was reclassified 
as an "Operation and Maintenance, General" project 
under category, "Navigation (Locks, Dams, Reservoirs, 
and Canals)" by authority of Chief of Engineers, 
April 23, 1956. Because of failure of both east 
and west gates, Schooner Bayou lock was closed by a 
dike across east approach channel and traffic routed 
through new control structure. Under ordinary conditions 
mean range of tide on Mermentau River near 
mouth is 1.6 feet and near head about 3 inches. 
Variation of water surface near the mouth may be as 
much as 7 or 8 feet, due to hurricanes on the gulf, and 
near head from 8 to 12 feet, due to freshets. Cost of new 
work, completed in 1956 was $4,631,910. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Hired labor 
continued operation and maintenance of Schooner 
Bayou and Catfish Point Control structures and 
prepared plans and specifications for maintenance 
dredging, mile -0.7 to 24.0. At Schooner Bayou, repairs 
were made to residences numbered 264, 266, and 269, 
and riprap was placed around butane barge slip, cavity 
adjacent to storage tank, and at northwest and 
southwest approach channel adjacent to structure. 
Maintenance by contract consisted of constructing, 
at Schooner Bayou Control Structure, an office and 
workshop and the demolition and removal of an 
existing one-story wood, barn-type structure. 
Condition at end of fiscal year. Construction of project 
began April 1947 and was completed July 1952. New 
work dredging was accomplished from April 1947 to 
June 1952. Catfish Point control structure was constructed 
from November 1948 to August 1951. Reservation 
comprises 9.7 acres. Schooner Bayou lock and 
control structures: Schooner Bayou lock and dam were 
completed in 1913 and 1914, respectively, and the 
lockmaster's house in 1917. Lock was closed to 
navigation May 7, 1951, and abandoned by authority 
of Chief of Engineers on October 9, 1951. Permanent 
closure of lock channel and tie-in dikes was completed 
September 1951. Construction of control structures was 
accomplished from August 1949 to May 1951. Reservation 
comprises 6.9 acres. Controlling depths, mean 
low gulf: (July 1968) bar channel, 4 feet; (July 1969) to 
Gulf Intracoastal Waterway through Grand Lake, 3 
feet; (Jan. 1968) from mile 161, west of Harvey lock 
through Schooner Bayou Cutoff, White Lake, Turtle 
Lake, Collicon Lake, and Grand Lake to Mermentau 
River, 3 feet. 
18. MISSISSIPPI RIVER, BATON ROUGE 
TO GULF OF MEXICO, LA. 
Location. Flows generally southeasterly through 
southeastern portion of Louisiana. At Head of Passes, 
approximately 233.1 miles below Louisiana Highway 
Commission bridge at Baton Rouge, river branches 
into three main passes: Southwest Pass, South Pass, and 
Pass a Loutre, two of which, Southwest Pass and South 
Pass, are improved under existing project. Head of 
Passes to mouths of Southwest and South Passes are 
20.1 and 13.5 miles, respectively. Mouth of Southwest 
Pass is 141 miles west of Mobile, Ala., and 349 miles 
east of Galveston, Tex. Mouth of South Pass is 18.5 
miles northeast of mouth of Southwest Pass. (See Coast 
and Geodetic Survey Charts 1269, 1271, and 1272; 
Mississippi River Commission alluvial valley map, and 
Zachary, Baton Rouge, White Castle, Donaldsonville, 
Thibodaux, Mount Airy, Bonnet Carre, Hahnville, 
New Orleans, St. Bernard, Barataria, Pointe a la 
Hache, Black Bay, Empire, Forts, West Delta, East 
Delta and Southwest Pass quadrangles and 1968 folio 
of flood control and navigation maps, Mississippi 
River, Cairo, Ill., to Gulf of Mexico, La., published by 
Mississippi River Commission.) 
Previous projects. For details see page 552 of Annual 
Report for 1963. 
Existing project. Provides for channel dimensions as 
follows: Between a line one-tenth mile below Louisiana 
Highway Commission bridge at Baton Rouge 128.6 
miles to upper port limits of New Orleans, 40 by 500 
feet mean low water; within limits of port of New 
Orleans, where that authority has jurisdiction over 
both banks of river, a distance of 17.2 miles, 35 by 1,500 
feet, measured from a line generally 100 feet from face 
of left bank wharves, but not closer than 100 feet to 
wharves on right bank; within 35-by 1,500-foot 
channel in port limits of New Orleans, 40 by 500 feet; 
from lower limits of port of New Orleans 86.7 miles to 
Head of Passes, 40 by 1,000 feet; Southwest Pass, 20.1 
miles from Head of Passes to outer ends of jetties, 40 by 
800 feet; Southwest Pass bar, 40 by 600 feet; South Pass 
from Head of Passes to outer ends of jetties, 13.5 miles, 
30 by 450 feet; and South'Pass Bar, 30 by 600 feet. 
Plane of reference through New Orleans and below is 
mean low gulf. General plan of improvement of 
Southwest Pass provides for contracting pass to uniform 
cross section with about 1,420-foot surface width by 
means of jetties, spur dikes and bulkheads; for channel 
improvement by dredging and retaining dredged 
material between dikes, bulkheads, and jetties; for 
dredging a channel through outer bar inclining to left 
of jetty axis; for construction of small revetted openings 
through narrow portions of banks of pass for purpose of 
392

NEW ORLEANS, LA., DISTRICT 
strengthening these banks; for closure of minor outlets 
not required for maintenance of banks; for construction 
of sills to prevent enlargement of Jump and 
Cubits Gap; for dredging to elevation minus 40 feet in 
river at Head of Passes, as far as Cubits Gap, a distance 
of 3.5 miles; for repairs to sill across Pass a Loutre and 
bank revetment at Head of Passes; for construction of 
dikes with a view to reducing width of river above 
Head of Passes; for construction of a submerged 
deflecting dike above Head of Passes; and for other 
minor work. East jetty is about 24,950 feet long and 
west jetty 19,699 feet. Jetties are composed of a 
substructure of brush mattresses, originally built to 
about elevation of mean low gulf, surmounted with a 
superstructure of concrete blocks and large riprap and 
for stone rubble mound of core and cover stone. Spur 
dikes are composed of cribwork of round piling filled 
with willows and stone, or with a curtain of round piles 
along upstream face. General plan of improvement of 
South Pass provides for construction and maintenance 
of jetties and spur dikes; maintenance of a sill across 
Pass a Loutre; for dredging a channel 40 feet deep and 
no specified width through shoals of river between 
Cubits Gap and Head of Passes, 3.5 miles, and for 
seaward extension of east jetty at mouth of pass; 
removal of west dike and construction of spur dikes and 
bank revetment at Head of Passes; removal of false 
point at head of South Pass to bottom elevation of 
minus 45 feet and revetment of new bank line and 
construction and maintenance of east and west 
headland structure at head of Passes. East jetty 
foundation is 12,070 feet long; inner east jetty is 11,170 
feet long; west jetty is 7,820 feet long; and inner west 
jetty is 4,710 feet long. Jetties are composed of a 
substructure of brush mattresses surmounted by a 
superstructure of stone and/or concrete blocks and large 
riprap. Spur dikes are composed of cribwork of round 
piling filled with willows and stone. Plane of reference 
is mean low gulf. Variation of water surface is 16 inches 
at mouths and 10 inches at heads of the passes, due to 
tides. Extreme range of tides at mouths of passes due to 
hurricanes is about 10 feet. At New Orleans extreme 
range of water surface is about 20 feet due to floods. At 
Baton Rouge Extreme range is about 45 feet due to 
floods. 
Estimated cost of existing project (July 1970) is 
$34,227,000 Federal and $18,000 non-Federal. In 
addition, Coast Guard is to provide navigation aids at 
an estimated cost of $28,900. 
Local cooperation. None required, except for modification 
of project in connection with Mississippi 
River-Gulf Outlet, which is reported separately. 
Terminal facilities. Some 100 piers, wharves, or docks 
serve Port of New Orleans. Most wharves on east or left 
bank parallel riverbank forming nearly a continuous 
covered quay about 10 miles long. Public wharves 
controlled by Board of Commissioners, Port of New 
Orleans (the Dock Board), cover 62 percent of 
improved waterfront. These facilities include a shipside 
grain elevator, general cargo and cotton wharves, fruit 
landings, bunkering facilities, terminal warehouses, 
railroad terminals, marine railways, and drydocks and 
are considered adequate for present commerce. (For 
further details see Port Series No. 20, "The Port of New 
Orleans, La." 1958.) A foreign trade zone is located in 
Port of New Orleans. (City of Baton Rouge has a 
reinforced concrete dock for deep sea vessels with 
mechanical-handling facility. Attached to downstream 
end of wharf is a floating wharf boat 231 by 40.5 feet, of 
2,000-ton capacity. Facilities are served by a transfer 
boat and municipal terminal having a capacity of 40 
cars per day. Private terminals for handling oil, grain, 
bauxite ore, and other products are at points on both 
sides of river between New Orleans and Baton Rouge. 
Facilities are considered adequate for existing commerce. 
(For further details, see "Port Facilities" 
included in "Flood Control and Navigation Maps of 
the Mississippi River, Cairo, Ill., to the Gulf of Mexico, 
Louisiana," published in 1968 by Mississippi River 
Commission, and Port Series No. 19, Vol. 1, "Port St. 
Joe, Fla., Pensacola, Fla., Baton Rouge, La., Panama 
City, Fla., Pascagoula, Miss., Lake Charles, La., 
Gulfport, Miss.," revised 1957.) 
Operations and results during fiscal year. New work. 
None. 
Maintenance: (a) Baton Rouge to New Orleans: 
U.S. dustpan dredge Jadwin removed 4,471,000 cubic 
yards from four crossings at a cost of $575,100. 
Reconnaissance surveys by hired labor were made of 
eight crossings, as required, at a cost of $23,000. 
(b) New Orleans Harbor: Leased dredges under two 
contracts removed 1,843,000 cubic yards of shoal 
material from the harbor at a cost of $414,000. In 
addition to the Board of Commissioners of the port of 
New Orleans, under reciprocal agreement, removed 
173,000 cubic yards from the harbor area. 
Traffic lights to govern movement of vessels within 
the harbor were operated the full year at a cost of 
$130,000. 
(c) Southwest Pass: The U.S. hopper dredge Langfitt, 
removed 5,997,000 cubic yards of material between 
mile 0.5 AHP and the gulf at a cost of $1,109,100. 
Six dredges under two unit price contracts removed 
6,634,000 cubic yards of material between miles 0.5 
AHP and 18.8 BHP at a cost of $741,500. 
Of the above dredging costs the following cost was a 
result of shoaling caused by hurricane "Camille" on 
August 17, 1969: Langfitt $168,500; contract, $39,600. 
(d) South Pass: The U.S. hopper dredge Langfitt 
removed 2,719,000 cubic yards of material from the 
channel between a point 4,000 feet inside the lower 
jetty channel and a point 2,500 feet out into the gulf at 
a cost of $367,600, of which $107,700 was the result of 
hurricane "Camille." 
As a result of hurricane "Camille," 311,200 cubic 
yards of material were removed by unit price contract 
at a cost of $123,600. 
393

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
(e) South and Southwest Passes: Hired labor repairs 
were made to parallel stone dikes, dredging targets, 
outlets, and miscellaneous pile dike structures at a cost 
of $901,800, of which $665,700 was a result of damages 
caused by hurricane "Camille." 
(f) Venice sub-office and Langfitt wharf: Repairs 
were made to the wharf at a cost of $76,400, of which 
$68,400 resulted from damages caused by hurricane 
"Camille." Operation of Venice sub-office cost $5,400. 
(g) Other items of expense were: Real estate land 
acquisition and expense, $40,600; channel surveys, 
$192,800; channel surveys, hurricane "Camille," 
$31,200; and supervision and administration, reports, 
channel patrol, engineering and design, engineering 
observations and studies, and purchase of salinity 
recorders, $647,600. 
Condition at end of fiscal year. The existing project is 98 
percent complete. Deepening Southwest Pass to 40 feet 
mean low gulf, as authorized by the modification of 
March 2, 1945, was completed in September 1963. 
Deepening the channel to 40 feet mean low water from 
Baton Rouge to New Orleans and to 40 feet mean low 
gulf in New Orleans Harbor, as authorized by the 
modifications of October 23, 1962, was completed in 
August 1963. 
Work remaining is construction of lateral permeable 
pile dikes in Southwest Pass from miles 1.8 to 2.8 on east 
bank and miles 10.1 to 14.4 and 19.1 to 20.2 on west bank. 
This work has been placed in deferred status. 
Channel conditions on June 30, 1970: Controlling 
depths were as follows: Entrance at Head of Passes, 40 
feet; through Southwest Pass, 40 feet, work in progress 
under unit price contract; through Southwest Pass bar, 
40 feet, work in progress by U. S. hopper dredge 
Langfitt; through South Pass, 28 feet; South Pass bar, 31 
feet. 
Total costs of existing project to end of fiscal year 
were $116,482,928, of which $33,187,008 was for new 
work and $83,295,920 for maintenance. 
L9. MISSISSIPPI RIVER-GULF OUTLET, 
LA. 
Location. In State of Louisiana and extends from 
existing Inner Harbor navigation canal at a point 
7,500 feet north of existing lock and about 11,000 feet 
from Mississippi River, to a turning basin south of 
Michoud, La., and then as a land and water cut from 
turning basin south of Michoud, La., southeasterly to 
and along south shore of Lake Borgne and through 
marshes to and through Chandeleur Sound to 38-foot 
contour in Gulf of Mexico. (See Coast and Geodetic 
Survey Charts 1115, 1116, 1267, 1268, 1269, 1270, and 
1271.) 
Existing project. Provides for a seaway canal, 36 by 500 
feet, extending 76 miles as a land and water cut from 
Michoud southeasterly to and along south shore of 
Lake Borgne, and across Chandeleur Sound to 
Chandeleur Island and increasing gradually to 38 by 
600 feet in Gulf of Mexico, with protective jetties at 
entrance, a permanent retention dike through Chandeleur 
Sound, and a wing dike along islands as 
required. It also provides for an inner tidewater harbor 
consisting of a 1,000- by 2,000-foot turning basin 36 
feet deep at landward end of seaway canal, and a 
connecting channel 36 by 500 feet wide extending 
westerly along Gulf Intracoastal Waterway from 
turning basin to Inner Harbor navigation canal, 
including construction of a suitable highway bridge 
with approaches to carry Louisiana State Highway 47 
(formerly 61) over channel. Plan further provides for 
future construction of a channel and lock at Meraux to 
furnish an additional connection between tidewater 
harbor and Mississippi River. Estimated cost for new 
work (July 1970) is $191,000,000 Federal and 
$44,500,000 non-Federal. In addition, Coast Guard is 
to provide navigation aids at an estimated cost of 
$483,000. This does not include modification for 
Mississippi River-Gulf Outlet, Michoud Canal, which 
is reported separately. 
Local cooperation. Assurances furnished and accepted. 
Rights-of-entry for entire project were furnished by 
local agency which is in process of actively conveying to 
the United States title to remaining tracts. 
Terminal facilities. The only facility located on the 
waterway is the Public Bulk Terminal of New Orleans 
constructed by Board of Commissioners, Port of New 
Orleans, on left descending bank at mile 63. 
Operations and results during fiscal year. New work by 
hired labor: Engineering studies, surveys, field investigations, 
and planning for new lock continued. 
Maintenance by hired labor. Condition and operation 
studies, channel patrol, preparation of plans 
and specifications, and maintenance dredging was 
continued. The U. S. dredge Langfitt removed 
3,900,020 cubic yards of shoal from the gulf entrance 
channel during the period July 21 through August 16, 
and September 19 through November 6, 1969, and the 
U. S. dredge McFarland removed 230,543 cubic yards 
during the period July 1 through July 4, 1969. 
Maintenance by contract: In addition to normal 
maintenance, hurricane "Camille", on August 17, 
1969, and a severe storm in the gulf on February 1, 
1970, caused extensive shoaling in the channel, making 
it necessary to perform maintenance dredging by six 
contracts as follows: The dredge Captain Clark restored 
4.55 miles of channel between stations 2600 to 2840 by 
the removal of approximately 5,209,155 cubic yards 
during the period July 6 through September 27, 1969, 
and restored 3.3 miles of channel between stations 2428 
and 2602 by the removal of approximately 3,557,368 
cubic yards during the period October 2 through 
December 6,1969. 
The dredge Orleans restored 4.17 miles of channel 
between stations 2840 and 3060 by the removal of 
4,923,633 cubic yards during the period October 3, 
1969 to March 19, 1970. 
394

NEW ORLEANS, LA., DISTRICT 
The dredges Fritz Jahncke, Port Arthur, and Dave 
Blackburn restored 7.6 miles of channel between stations 
2550 to 2840 and 3150 to 3260 by the removal of 
approximately 9,089,455 cubic yards during the period 
March 18 to June 30,1970. 
Construction was initiated March 6, 1970, to restore 
8.52 miles of channel between stations 3060 to 3150 and 
3560 to 3920 by the dredges New York and Captain Clark 
and the contract is 41 percent complete with the 
removal of 3,741,678 cubic yards. 
Construction was initiated June 7,1970, to restore 5.7 
miles of channel between stations 3260 to 3560 by the 
dredges Dave Blackburn and Bill Bauer and contract is 38 
percent complete with the removal of 1,597,284 cubic 
yards. 
In addition to dredging operations, a total of 20 
marker piles were driven on October 2 and 3,1969. 
Condition at end of fiscal year. Construction was initiated 
March 1958 and entire project is 33 percent complete. 
The channel was opened to navigation July 25, 1963, 
and completed January 20, 1968. Paris Road bridge 
was opened to traffic July 21, and completed November 
14, 1967. Approximately 3 miles of first and 
second lift stone dikes have been constructed on north 
side of channel and approximately 7.3 miles of first lift 
and 3 miles of second lift stone dike have been 
constructed on south side of channel in Breton Sound. 
Principal work required to complete project is construction 
of new ship lock, raising and extending dikes, 
and construction of foreshore protection. 
Controlling depths, mean low gulf: (May 1970) 
Inner Harbor navigation canal (mile 66) , 36 feet; to 
shore end of jetties (mile 23.2), 36 feet; to sea end of 
jetties (mile 20), 36 feet; through Breton Sound (mile 
0), 35 feet; and to.end of project (mile minus 9.38), 32 
feet. 
20. MISSISSIPPI RIVER-GULF OUTLET, 
MICHOUD CANAL, LA. 
Location. The improvement is located in the coastal 
marsh area adjacent to Lake Borgne and within the 
corporate limits of the city of New Orleans. (See U. S. 
Coast and Geodetic Survey Chart No. 1269.) 
Existing project. Provides a deep-draft navigation 
channel in the Gulf Intracoastal Waterway and 
Michoud Canal by enlargement to a depth of 36 feet 
over a bottom width of 250 feet from the Mississippi 
River-Gulf Outlet channel to and including a turning 
basin 800 feet square at the north end of Michoud 
Canal. Estimated cost of new work (July 1970) is 
$1,680,000 Federal and $63,000 non-Federal. In 
addition, Coast Guard is to provide navigation aids at 
an estimated cost of $9,000. 
Local cooperation. Local interests must provide without 
cost to the United States, all lands, easements, and 
rights-of-way required for construction and subsequent 
maintenance of the project and for aids to navigation 
upon the request of the Chief of Engineers, including 
suitable areas determined by the Chief of Engineers, to 
be required in the general public interest for initial and 
subsequent disposal of spoil, and also retaining dikes for 
disposal of spoil from maintenance dredging, if 
required; accomplish without cost to the United States 
such utility or other relocations or alterations as 
necessary for project purposes; and hold the United 
States free from damages due to the construction and 
subsequent maintenance of the project, including any 
erosion beyond the rights-of-way furnished. Assurances 
of local cooperation were requested by letter dated 
January 10, 1969, of the Board of Commissioners of the 
Port of New Orleans. Such assurances were executed 
on February 3, 1969, and accepted on behalf of the 
United States on February 24,1969. 
Terminal facilities. There are no public wharves 
located in the area; however, the developer of the area 
states that the corporation has retained a tract of land 
at the north end of the Michoud Canal for construction 
of a public wharf for seagoing and other marine traffic, 
which would be available to industries without 
frontage on waterways. Several private facilities are 
located on the canal and others are anticipated in the 
future. The Gulf Intracoastal Waterway intersects the 
Mississippi River-Gulf Outlet approximately 1.5 miles 
westward from the Michoud Canal. This outlet 
provides a direct tidewater route for ocean shipping. 
Operations and results during fiscal year. Hired labor 
forces are proceeding with the work required for the 
preparation of the GDM. Surveys have been completed 
and the remaining design effort is proceeding on 
schedule. Preparation of the GDM is approximately 20 
percent complete. 
Condition at end of fiscal year. Construction has not 
commenced. 
21. OVERTON-RED RIVER WATERWAY, 
LA. 
Location. In State of Louisiana between junction of 
the Old and Mississippi Rivers and Shreveport, La., 
along the Old and Red Rivers, through landcuts and 
natural channels on the south bank of Red River. (See 
Geological Survey State maps and Mississippi River 
Commission alluvial valley quadrangle maps.) 
Existing project. Provides for a channel 206 miles long, 
9 feet deep and 100 feet wide, extending from 
Mississippi River at mile 301 above Head of Passes 
through Old River and Red River to mile 31, thence by 
a lateral canal extending through landcuts and existing 
waterways, across the Mississippi-Red River backwater 
area and along south bank of Red River floodplain to 
Shreveport, La., and construction of nine locks and a 
pumping plant on Red River near Shreveport. Floods 
ordinarily cause fluctuations of stage between high and 
low water in Old River, Red River, and the backwater 
area of from 30 to 45 feet; the fluctuations of stages on 
the south bank tributary streams are somewhat less. 
Estimated cost for new work, (lower 31 miles only), 
395

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
(July 1970) is $14,300,000 Federal and $49,000 non- 
Federal. 
Local cooperation. Local interests must furnish lands, 
easements, and rights-of-way for construction and 
future maintenance; provide necessary changes in 
existing highways, highway bridges, and approaches 
thereto; provide alteration to utilities, except railroad 
facilities; maintain parts of all railroads, highways, 
bridges, and utilities affected by the improvement; 
maintain and operate adequate terminal and transfer 
facilities; and hold the United States free from 
damages. 
Assurances of local cooperation were furnished for 
the lower 31 miles by Red River Waterway Commission, 
governing body of the Red River Waterway 
District, and accepted on behalf of the United States on 
October 11, 1967. 
Terminal facilities. None. Will be furnished if necessary. 
Operations and results during fiscal year. New work by 
hired labor: Surveys were made and plans and 
specifications prepared for placing revetment at 
Blakewood Lake. 
Condition at end of fiscal year. Construction of the lower 
31 miles was initiated November 12, 1968, and is 5 
percent complete with 2,800 linear feet of bank 
protected. 
22. PETIT ANSE, TIGRE, AND CARLIN 
BAYOUS, LA. 
Location. Bayou Tigre is a tributary of Bayou Carlin; 
Bayou Carlin is a tributary of Bayou Petit Anse. Bayou 
Petit Anse has its source in Iberia Parish about 5 miles 
northwest of New Iberia. It flows southwesterly for 
about 15 miles to its intersection with Gulf Intracoastal 
Waterway, thence for about 3 miles to Vermilion Bay. 
Bayou Tigre has its source in Vermilion Parish about 6 
miles northeast of Abbeyville and flows southerly about 
7 miles to its junction with Bayou Carlin. Bayou Carlin 
has its source in Lake Peigneur in Iberia Parish and 
flows southerly about 7.5 miles to its confluence with 
Bayou Petit Anse at a point about 2.3 miles above 
Intracoastal Waterway. (See U. S. Coast and Geodetic 
Survey Chart 1116, Corps of Engineers, Mississippi 
River Commission alluvial valley maps and Derouen 
quadrangle, and U. S. Geological Survey map Abbeville, 
N.E., quadrangle.) 
Existing project. Provides for a harbor of refuge at 
Delcambre, dredging a channel in Bayou Petit Anse 9 
feet deep and 80 feet wide from Intracoastal Waterway 
to north end of Avery Island; a channel 7 feet deep and 
60 feet wide from Intracoastal Waterway via McIlhenny 
Canal (Avery Canal) to deep water in Vermilion 
Bay; and a channel 9 feet deep over a bottom 
width of 80 feet in Bayou Carlin from Bayou Petit Anse 
to Lake Peigneur. Total length of improvement is 16.1 
miles. Under ordinary conditions mean range of tide is 
about 10 inches. 
All work under existing project was completed in 
1962 at a cost of $344,389. In addition, $47,858 was 
expended from public works funds. 
Local cooperation. Fully complied with. 
Terminal facilities. There is a large oil terminal at head 
of improvement on Bayou Petit Anse and several 
private docks and crane hoists. (Terminal facilities are 
further described in H. Doc. 225, 72d Cong., 1st sess.) 
Facilities are considered adequate for existing commerce. 
Operations and results during fiscal year. Hired labor 
forces conducted channel patrol activities. 
Maintenance by contract consisted of dredging at 
the following locations: Bayou Petit Anse, stations 
0 + 00 to 175 + 00, 3.3 miles; approach channel to 
Avery Canal, stations 0 +00 to 51+00, 1 mile; and 
Bayou Carlin, stations 83 + 00 to 180+ 00,1.8 miles, and 
mooring area. A total of 430,381 cubic yards were 
removed by dredges Conical and Tchefuncta during the 
period October 20,1969 to April 4,1970. 
Condition at end offiscalyear. All work under project, as 
existent at that time, was completed 1939; and work 
authorized by River and Harbor Act of March 2, 1945, 
for a 9- by 80-foot channel was completed in 1947, 
except dredging in vicinity of Texas & New Orleans 
Railroad bridge and Louisiana State Highway Department 
bridge crossing Bayou Carlin, which was 
accomplished during 1949, as was reinforcement of 
bridge piers under reimbursable agreement, authorized 
by River and Harbor Act of June 30, 1948. 
Modification of project authorized by River and 
Harbor Act of July 14, 1960, was completed March 30, 
1962. 
Jefferson Island Salt Co. has partially complied with 
furnishing a 9- by 80-foot canal connecting Bayou 
Carlin with their salt mine, as provided in authorizing 
document. Chief of Engineers has accepted a 9- by 60- 
foot channel as partial completion and this 9- by 60- 
foot channel has been excavated for full length 
prescribed. 
Controlling depths, mean low gulf, were: Bayou 
Petit Anse (Apr 1970) mile 0 (GIWW) to mile 6.1, 6 
feet; Bayou Tigre (Aug. 69) mile 0 (Bayou Carlin) to 
Highway bridge, 4 feet; Bayou Carlin, mile 0 to 7.6, 9 
feet. 
Total cost under existing project to end of fiscal year 
was $909,442, of which $344,389 was for new work and 
$565,053 for maintenance. In addition, $47,858 was 
expended from public works funds for new work. 
23. RED RIVER BELOW FULTON, ARK. 
Location. Red River rises in arid regions of eastern 
New Mexico, flows generally easterly and southeasterly 
for 1,300 miles, and enters Atchafalaya and Old Rivers 
and the Mississippi River at Red River Landing, La., 
via Old River. (See Geological Survey State maps and 
Mississippi River Commission alluvial valley quadrangle 
maps.) 
396

NEW ORLEANS, LA., DISTRICT 
Previous project. For details see page 572, 1957 Annual 
Report. 
Existing project. Continuing improvement of Red 
River from Fulton, Ark., to Atchafalaya River, La., 
455.6 miles, by systematic clearing of banks, snagging, 
dredging shoals, building levees (either alone or in 
cooperation with riprarian states), closing outlets, 
revetting caving banks, and preventing injurious 
cutoffs. Lower end of this project, exclusive of Overton- 
Red River Waterway, is at Old River, 7.6 miles west of 
Mississippi River. No proposed channel dimensions are 
given. Floods ordinarily cause fluctuations of stage 
between high and low water of from 30 to 45 feet; 
unusual floods occasionally increase this range about 10 
feet. 
Local cooperation. None required. 
Terminal facilities. None. 
Operations and results during fiscal year. Hired labor 
forces conducted stream gaging and reconnaissance 
surveys. 
Condition at end of fiscal year. Maintenance in recent 
years provides for navigation to Shreveport, La., at 
medium and high stages. From January to July, 
prevailing stage is 6 feet and over, and controlling 
depths are about 4 feet to Fulton, 5 feet to Shreveport, 
and 6 feet to Alexandria. During remainder of year 
stages near zero may be expected, with controlling 
depths less than 1 foot from Fulton to Shreveport, 1 to 2 
feet from Shreveport to Alexandria, and 4 feet from 
Alexandria to mouth of Black River. Controlling 
depths, mean low water: (Apr.1970) mouth of Black 
River (mile 33.8) to mile 30, 38 feet; to mile 25, 35 feet; 
to mile 10, 36 feet; to mile 6 (Barbre Landing), 51 feet. 
Total cost of existing project to June 30, 1970, was 
$2,428,765, of which $409,928 was for new work and 
$2,018,837 for maintenance. 
24. REMOVING WATER-HYACINTH 
(LOUISIANA) 
Location. Lakes and streams tributary to the gulf 
coast. 
Existing project. Removal of plants from navigable 
waters of Florida, Alabama, Mississippi, Louisiana, 
and Texas, so far as they are or may become an 
obstruction to navigation, by any mechanical, chemical, 
or other means whatsoever; for construction and 
operation of boats equipped with suitable machinery 
for such removal; and construction and operation of 
booms to prevent plants drifting from one stream to 
another. 
Local cooperation. None required. 
Operations and results during fiscalyear. Maximum use of 
funds available was made by using chemical methods 
of destruction with mechanical equipment held in 
reserve for use only when hyacinth jams necessitate it. 
Work was accomplished in main waterways and their 
principal tributaries over which a major portion of 
451-584 0-72-26 
navigation moves. Preventive maintenance work was 
carried out in secondary streams and feeder areas 
whenever possible. Feeder areas previously freed of 
hyacinth and placed on patrol maintenance basis have 
become infected with alligatorweed which has not 
proved to be as susceptible to approved chemical 
methods as water-hyacinth. A total of 8,233 acres of 
vegetation was treated by chemicals in Bayou Black, 
Lake Cataouatche and feeder streams, Lake des 
Allemands area, Lake Dauterive area, Bayou Penchant-
Bayou Copasaw area, Gulf Intracoastal Waterway, 
streams of Maurepas-Pontchartrain Basin, 
Plaquemine Waterway, Caddo Lake, Bayou Lacassine, 
and Bayou Teche. There was no necessity for 
mechanical destruction methods. Operations were 
conducted in main navigable streams on a recurring 
basis. These results cannot be considered permanent 
until vegetation in secondary streams and feeder areas 
has been destroyed. 
Condition at end of fiscal year. From 1900 to 1902 a boat 
with suitable machinery for destroying hyacinth by 
crushing was operated. From that time until 1937 
hyacinths were destroyed through use of a solution of 
arsenic and caustic soda which was sprayed on 
vegetation, removal by hand crews, and controlled in 
their movements by means of booms and barricades. 
Use of arsenic was discontinued and hand removal 
supplanted by use of mechanical equipment in 
conjunction with chemical spray (2,4-dichlorophenoxyacetic 
acid). Use of booms and barricades 
has been discontinued. Present methods of 
control are by means of mechanical rotary saw-type 
destroyers, and chemical treatment. Excellent results 
are being obtained on water-hyacinths by these 
methods. 
25. WATERWAY FROM EMPIRE, LA., TO 
GULF OF MEXICO 
Location. Waterway from Empire, La., to Gulf of 
Mexico via Bayous Long and Fontanelle. (See Mississippi 
River Commission, Corps of Engineers maps, 
Empire quadrangle.) 
Existing project. Improvement provides for construction 
and maintenance of a waterway, 10 miles 
long, from State-owned canal and lock at Empire, La., 
to Gulf of Mexico, to provide a channel 9 by 80 feet, 
and for initial construction of rubblestone jetties 
inshore of 6-foot depth contour, with landward 
extensions thereof as required to prevent flanking, and 
for seaward extensions to 9-foot depth contour if and 
when it becomes apparent that such extensions will be 
more economical than maintenance dredging of 
entrance channel. 
Normal range of tide is from 16 to 40 inches; 
hurricane tides may exceed 6 feet. 
Construction was completed at a cost of $1,068,142, 
excluding $1,573,000 for extension of jetties to 9-foot 
depth contour. 
97

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Hired labor 
forces carried on surveys and channel patrol, and 
prepared plans and specifications for jetty repairs and 
groin construction. 
Condition at end of fiscal year. Project is physically 
complete, unless at a later date it is found necessary to 
extend jetties to 9-foot depth contour. Project construction 
was initiated in July 1948 and completed in 
June 1950, during which period the 9- by 80-foot 
channel from Empire, La., to Gulf of Mexico, 10 miles, 
was excavated by contract. A total of 3,736 linear feet 
of jetties was constructed by contract to 6-foot depth 
contour, 1,818 linear feet on east jetty and 1,918 linear 
feet on west jetty, from June 23, 1949, to February 18, 
1950. Controlling depths, mean low gulf: (Jan. 70) 
Doullut Canal to mile 8.5, 7 feet; to jetties, 9 feet; 
through jettied channel, 16 feet; bar channel, 11 feet. 
26. RECONNAISSANCE AND CONDITION 
SURVEYS 
Reconnaissance and condition surveys were conducted 
in June 1970 on Amite River and Bayou 
Manchac, La., Chefuncte River and Bogue Falia, La., 
Bayou Lacombe, La., Bayou Dupre, La., Bayou 
Bonfouca, La., and Waterway from Intracoastal 
Waterway to Bayou Dulac, La. (Bayous Grand Caillou 
and LeCarpe, La.). Reconnaissance of other inactive 
projects were conducted throughout the year. 
Costs for the fiscal year were $20,623. 
27. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See table 11-F.) 
28. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to section 107, Public Law 86- 
645 (preauthorization) 
Preauthorization studies for fiscal year cost $17,302 
for Coon Island Channel, Calcasieu River, La. 
FLOOD CONTROL. 
29. BAYOU BODCAU AND TRIBUTARIES, 
ARK., AND LA. 
Location. In left bank flood plain of Red River. Bayou 
Bodcau rises in vicinity of Hope, Ark., and flows 
southerly through Bayou Bodcau Reservoir and 
Bodcau Lake to join Cypress Bayou and form Red 
Chute Bayou, continues through Red Chute Bayou, 
Flat Lake, and Loggy Bayou to Red River, about 40 
miles below Shreveport, La. 
Existing project. Cypress Bayou-Red Chute Bayou 
levee: Extend existing levee about 8 miles southeast of 
Benton, La., proceeding generally southerly to junction 
of Cross and Red Chute Bayous, and then parallel to 
Red Chute Bayou for 9.5 miles; place low fill in saddle 
about 5 miles southeast of Benton; construct stream 
closure at approximate mile 16 on Red Chute Bayou to 
sever connection with Flat River; construct landside 
drainage channel and three culverts with flap gates on 
Red Chute Bayou; relocate utility lines as needed; and 
improve Red Chute Bayou channel by clearing and 
snagging, miles 11 to 20.2. 
Flat River-Loggy Bayou levee: Extend from lower 
end of existing Red River levee in vicinity of Ninock, 
La., along high bank of Red River to a point on right 
descending bank of Loggy Bayou, about 1 miles above 
its mouth, thence generally along right banks of Loggy 
Bayou, Red Chute, Cutoff Bayou, and Flat River to 
Taylortown to tie into existing Red River levee; close 
Flat River near its junction with Cutoff Bayou and 
install a 36-inch round corrugated metal pipe with 
vertical sliding gates in this closure so that the area 
below can receive flow from upper Flat River during 
low water period; construct control structures on Flat 
River near its junction with Red Chute Bayou and 
along alinement of levee in vicinity of Grassy Lake; 
and make necessary utility relocations. 
Flat River channel improvement: Enlarge to average 
bottom width of 35 feet and average depth of 20 
feet from confluence with Cutoff Bayou to junction 
with Cooper Bayou, 11.6 miles, including required 
relocations and modifications of utilities. Estimated 
cost for new work (July 1970) is $2,620,000 Federal and 
$1,020,000 non-Federal. 
Local cooperation. Provide lands, easements, and 
rights-of-way for construction, including flowage easements 
over 10,900 acres of bottom lands above U. S. 
Highway 80 that will be adversely affected by the 
levee; provide all relocation of pipelines, utilities, 
roads, bridges, and other facilities; hold the United 
States free from damages; provide assurances that 
encroachment on improved channels or on ponding 
areas will not be permitted, and that, if ponding areas 
and capacities are impaired, substitute storage capacity 
or equivalent pumping capacity will be provided 
promptly without cost to the United States; and 
maintain and operate all works after completion. 
Assurances of local cooperation were furnished by 
Bossier Levee District and Nineteenth Louisiana Levee 
and Drainage District and accepted on behalf of the 
United States. 
Operations and results during fiscal year Hired labor forces 
and architect-engineer firms continued studies and 
investigations for preparation of two general design 
memorandums. The memorandum for Cypress Bayou- 
Red Chute Bayou levee was 95 percent complete when 
a sand stratum was discovered in the upper limits of the 
project. Redevelopment of another plan will be 
required in that area. The memorandum for Flat 
River-Loggy Bayou levee and the Flat River channel 
improvement is 85 percent complete. 
398

NEW ORLEANS, LA., DISTRICT 
Condition at end of fiscal year. Construction has not 
commenced. 
30. BAYOU BODCAU RESERVOIR, LA. 
Location. In Red River Basin on Bayou Bodcau in 
Bossier Parish, La., 72 miles above mouth of Loggy 
Bayou and 35 miles northeast of Shreveport, La. (See 
Geological Survey State map, scale 1:500,000.) 
Existing project. An earthfill dam rising 76 feet above 
streambed with a reservoir providing a flood control 
storage capacity of 357,000 acre-feet. Outlet works are 
in south abutment, and an uncontrolled spillway is on 
north abutment. Reservoir controls 656 square miles, 
or 53 percent, of entire drainage area of Bayou Bodcau. 
Construction of a floodway for diversion of Bayou 
Bodcau and Cypress Bayou to improve flood protection 
was authorized by 1936 Flood Control Act. This 
authorization was modified by 1938 Flood Control Act, 
which authorized construction of a reservoir and other 
flood control works in lieu of construction of a floodway 
for diversion of Bayou Bodcau and Cypress Bayou, La., 
to improve flood protection, and further modified by 
War Department Civil Appropriation Act of 1939 
which provided that reservoir and other flood control 
works on Bayou Bodcau and Cypress Bayou, La., 
authorized by Flood Control Act of 1938, shall be 
constructed in accordance with revised plans and cost 
estimates in Office, Chief of Engineers. Cost of new 
work completed in 1961, except construction under 
Cost 710, was $4,098,740. Estimated cost for Code 710 
(July 1970) is $920,000. 
Local cooperation. None required. 
Operations and results during fiscal year. Operation and 
ordinary maintenance of the dam and reservoir was 
continued throughout the fiscal year. Negotiations are 
in progress with the State of Louisiana for turning the 
damsite over to the State for operation and maintenance 
after development of recreational facilities. 
(See Table 11-G for reservoir operations.) 
Number of visitor-days of recreational use, 276,315 
(calendar year 1969). 
Condition at end of fiscal year. Construction was initiated 
April 1947 and completed April 1961, except construction 
under Code 710. 
31. BAYOU PIERRE, LA. 
Location. In Red River Basin below Shreveport, La., 
along channel of Bayou Pierre from its mouth at Grand 
Ecore, La., upstream 30 miles to its confluence with 
Bayou Wincy. (See Geological Survey State map, scale 
1:500,000.) 
Existing project. Provides for widening channel at 
intervals, totaling 12.9 miles, and snagging of 29.7 
miles, to reduce flood damage and improve sanitary 
and living conditions over a wide area. Cost of new 
work, completed in 1939, was $299,529. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Condition and 
operation studies were continued by hired labor. 
Maintenance by hired labor consisted of applying 
herbicide treatment on brush from mile 0 to mile 12 
and cutting overhanging trees by hand and applying 
herbicide treatment to stumps from mile 12 to 29.4. 
Driftwood was also removed from bridges. 
Condition at end of fiscal year. Construction was initiated 
in fiscal year 1938 and completed in fiscal year 1939. 
32. CADDO LAKE, LA. 
Location. In Caddo Parish, about 19 miles northwest 
of Shreveport, La., at foot of Caddo Lake and at head 
of Twelve Mile Bayou. 
Existing project. Replacement of existing dam with 
new dam having same flow characteristics and located 
as near as practicable downstream of the old dam, built 
under navigation project "Cypress Bayou and Waterway 
between Jefferson, Tex., and Shreveport, La." 
New dam will be capable of being raised in the future if 
desirable and justified. Estimated cost of new work 
July 1970) is $3,270,000 Federal and $218,000 non- 
Federal. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Construction of 
dam continued by contract. 
Condition at end of fiscal year. Construction of project 
commenced in August 1968, and is 78 percent 
complete. 
33. COOPER LAKE AND CHANNELS, 
TEX. 
Location. Cooper Dam and Reservoir is about 4 miles 
southeast of Cooper, 13 miles north of Sulphur Springs, 
Tex., and is at mile 23.2 on South Sulphur River, 
which rises in Fannin County, Tex., and flows 
generally east for about 80 miles to its confluence with 
North Sulphur River to form Sulphur River. 
Existing project. Provides for construction of an 
earthfill dam with maximum height of about 73 feet, 
15,882 feet long at its crest, one controlled (service) 
spillway, and an emergency uncontrolled spillway. 
Reservoir area will be 22,740 acres at top of flood 
control pool, 5,084 acres at top of sediment pool, and 
19,305 acres at top of water-supply pool. The reservoir 
will contain 131,400 acre-feet of flood control storage 
space, 273,000 acre-feet of municipal and industrial 
water supply space, and 37,000 acre-feet of sediment 
storage. Also provides for channel clearing, realinement, 
and enlargement; enlargement and extension 
of existing levees; and construction of appurtenant 
drainage works along main stem of Sulphur 
River above mile 126; channel clearing, realinement 
and enlargement and levee enlargement and modification 
of appurtenant drainage works on Cuthand 
Creek below mile 24, on Sulphur River below mile 70, 
except in proposed Cooper Reservoir, miles 29 to 42, 
399

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
and on Middle Sulphur River below mile 8; channel 
clearing and realinement of Brushy Creek below mile 
5; and levee enlargement on North Sulphur River 
between miles 1 and 5. Uncompleted channel and 
levee improvements lying between the damsite and 
Texas Highway 37 will be deleted in the interest of 
accommodating Texas Water Plan. Estimated Federal 
cost for new work (July 1970) is $39,100,000, which 
includes $16,162,700 to be reimbursed by water supply 
users over a 50-year period, and $2,029,000 non- 
Federal, including a $1,700,000 cash contribution for 
modifications to accommodate the Texas Water Plan. 
This estimate is based on a reservoir containing 
273,000 acre-feet of water supply. Estimated non- 
Federal cost for the levee and channel work is $329,000. 
Local cooperation. Except for Cooper Reservoir, local 
interests must furnish lands and rights-of-way, and 
alter and relocate highways and related facilities and 
utilities, except railroads, for construction; hold the 
United States free from damages; maintain and 
operate all works after completion, and preserve 
channel capacities by preventing encroachment. Local 
agencies furnished rights-of-way for first two phases of 
work on levees and channels downstream from Cooper 
Dam. Right-of-way acquisition for part II, for channels 
and levees downstream from Cooper Dam, is essentially 
complete, except for that required below mile 
140.4, Sulphur River (Magnolia Pipeline Crossing). 
Right-of-way acquisition for this portion of project is 
inactive pending resolution of a controversy among 
local interests as to the responsibility for relocation of 
the pipeline. Right-of-way acquisition for part III is no 
longer required because these improvements have been 
deleted in the interest of accommodating the Texas 
Water Plan. 
Operations and results during fiscal year. Surveys, planning, 
and negotiations with cooperating agencies were 
continued by hired labor. A real estate office was 
established in April 1970 to initiate land acquisition at 
the damsite. 
Condition at end of fiscal year. Construction of project 
began July 1958 and is 11 percent complete, with 14.2 
miles of South Sulphur River and 3.2 miles of Middle 
Sulphur River channels excavated; and 3.4 miles of 
levee embankment on South Sulphur River and. 7.3 
miles of levee embankment constructed on Middle 
Sulphur River, all upstream from Cooper Reservoir. 
About 10.5 miles of levee on North Sulphur River, 8.2 
miles of levee on Sulphur River, 14 miles of levee on 
Cuthand Creek, and 4.2 miles of levee on Brush Creek 
were strengthened; 0.5 mile of levee in Kickapoo Creek 
was enlarged; and 15.3 miles of new channel in 
Cuthand Creek, 0.8 mile of new channel in Brush 
Creek, and 0.2 mile of cutoff channel in Kickapoo 
Creek were excavated; all downstream from Cooper 
Reservoir, part I. Modification of Texas and New 
Orleans Railroad Co.'s trestle 93.77, Middle Sulphur 
River, was completed August 1959, and modification of 
St. Louis Southwestern Railway Co.'s trestles 533.74 
and 542.61, South Sulphur River, January 1960. 
Work on the detail design memorandum for the dam 
and reservoir has been delayed due to discovery of a 
fault zone beneath the service spillway site, and the 
resulting study that was required to find a new site. 
Work on the detail design memorandum will be 
resumed upon final approval of an alternative site that 
is located in the south abutment of the dam. 
34. GARLAND CITY, ARK. 
Location. Red River is formed in West Texas and 
flows easterly along Texas-Oklahoma State line into 
southwestern Arkansas at Fulton where the river turns 
and flows southward to above Shreveport, La., and 
then southeastward to join with Old River and form 
Atchafalaya River. Garland City is in Miller County, 
Ark., on right bank of Red River about mile 372 (1957 
mileage). 
Existing project. Bank protection works consisting of a 
pile revetment on left bank of Red River above railway 
bridge or equivalent protective works, rock groins 
between the bridges, riprap around east bank railway 
pier, pile dikes on right bank of Red River above 
railway bridge, channel excavation on right bank in 
vicinity of railway bridge and a board revetment or 
equivalent work near anticipated natural cutoff to be 
constructed for protection of railway and highway 
bridges over Red River at Garland City, Ark. 
Estimated cost for new work (July 1969) is $1,340,000 
Federal and $6,000 non-Federal. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Hired labor 
forces initiated preparation of plans and specifications 
for extension of stone dike reinforcement, and performed 
general engineering and planning duties. 
Condition at end of fiscal year. Construction under 
project began in March 1962 and is 75 percent 
complete with pile revetment on left and right banks of 
Red River above railway bridge completed, rock groins 
between bridges constructed, and riprap placed around 
east bank of St. Louis Southwestern Railway pier. 
Additional bank stabilization is required to complete 
project. 
35. GRAND ISLE AND VICINITY, LA. 
(HURRICANE PROTECTION) 
Location. In coastal section of Louisiana, encompassing 
an area extending about 30 miles along the 
shore of the gulf and inland for about 70 miles. 
(See Geological survey quadrangles Cut-Off, Lake 
Felicity, Bay Dosgris, Golden Meadow Farms, Bay 
Tambour, Mink Bayou, Caminada Pass, Leeville, 
Belle Pass, Pelican Pass, and Calumet Island; Engineer 
quadrangles New Orleans, Hahnville, Point-a-la- 
Hache, Barataria, and Fort Livingston; and Coast and 
Geodetic Survey Charts 1115 and 1116.) 
400

NEW ORLEANS, LA., DISTRICT 
Existing project. Provides a loop levee about 36 miles 
long along both banks of Bayou Lafourche from 
Golden Meadow to Larose; enlargement of 3 miles of 
existing levee at Golden Meadow; floodgates for 
navigation and hurricane protection in Bayou Lafourche 
at upper and lower bayou crossings; about 8 
miles of low interior levees to regulate intercepted 
drainage and seven multibarreled culverts controlled 
by flap-gate. Estimated cost for new work (July 1970) is 
$9,390,000 Federal and $4,020,000 non-Federal, including 
a cash contribution of $1,440,000. 
Local cooperation. Provide lands, easements, rights-ofway, 
and spoil-disposal areas for construction and 
future maintenance; alter pipelines, cables, wharves, 
oil wells, and any other facilities for construction; 
prevent encroachment on ponding areas unless substitute 
storage capacity or equivalent pumping capacity 
is provided promptly without cost to the United 
States; maintain and operate all works after completion; 
contribute in cash and equivalent work 30 
percent of total project cost, including cost for 
furnishing rights-of-way, relocations, etc.; and hold the 
United States free from damages. Executed assurances 
dated February 1967 were received from the Lafourche 
Parish Police jury and accepted on behalf of the United 
States. 
Operations and results during fiscal year. Hired labor 
forces and an architect-engineer firm continued studies 
and investigations for preparation of a general design 
memorandum, which is 85 percent complete. 
Condition at end of fiscal year. Construction has not 
commenced. 
36. HARVEY CANAL, BAYOU BARATARIA 
LEVEE, LA. 
Location. In Jefferson Parish, La., on the right bank of 
the Mississippi River opposite New Orleans and 
bounded on the east by Harvey Canal, on the west and 
south by Bayou des Familles, and on the north by the 
towns of Marrero and Harvey. 
Existing project. To provide flood protection by 
construction of new levees and enlargement of existing 
non-Federal levees along Harvey Canal and Bayou 
Barataria from mile 1.8 on Harvey Canal to Louisiana 
Highway No. 45 near Crown Point, a distance of 
approximately 9.2 miles. Estimated cost for new work 
(Aug. 1968) is $992,000 Federal, and $802,000 non- 
Federal, not including $330,000 for improvements now 
in place. 
Local cooperation. Provide lands, easements and rightsof-
way for construction of the project, including 
necessary modifications an4/or relocation of existing 
facilities; hold the United States free from damages due 
to the construction works; construct an additional 
pumping station with an initial capacity of not less 
than 154 c.f.s. as provided in the plan of improvement, 
and future extensions to pumping capacities as may be 
necessary for the development of the area; and 
maintain and operate all works after completion. The 
Jefferson Parish Council furnished an Act of Assurance 
dated April 20, 1967, which was accepted by the 
United States on October 13, 1967. The local agency 
has acquired and made available necessary rights-ofway 
for construction purposes. 
Operations and results during fiscal year. New work by 
hired labor consisted of general engineering and 
planning. 
Condition at end of fiscal year. Construction has not 
started. 
37. LAKE O' THE PINES, TEX. 
Location. On Cypress Creek in Marion, Harrison, 
Upshur, Morris, Camp, and Titus Counties, Tex., 8 
miles west of Jefferson, Tex. 
Existing project. An earthfill dam 10,600 feet long and 
77 feet high, includes a 200-foot spillway with a 
capacity of 68,200 cubic feet per second. Reservoir 
controls runoff from 850 square miles of drainage area, 
and has a gross storage capacity of 842,100 acre-feet, 
including 587,200 acre-feet flood control storage, 3,800 
acre-feet conservation storage, and 251,100 acre-feet 
for municipal and industrial water supply. Reservoir 
extends 28 miles upstream. Project affords substantial 
flood protection of Cypress Creek Valley from damsite 
to confluence with Red River and, together with 
operation of other reservoirs proposed in Red River 
Basin, will provide flood protection along main stem of 
Red River below Denison Dam. Estimated cost for new 
work (July 1970) is $14,753,000 Federal including 
$2,234,200 for Code 710 and $399,739 accelerated 
public works funds. Estimated cost for contributed 
funds (July 1970) is $1,978,000. 
Local Cooperation. None required. 
Operations and results during fiscal year. New work by 
hired labor, under Code 710, consisted of preparation 
of plans and specifications for construction of one 
comfort station and oxidation pond. Sheltered picnic 
tables and swimming beach were constructed and 
parking areas were surfaced. Other new work by hired 
labor consisted of real estate activities. 
Maintenance by hired labor consisted of real estate 
activities, condition and operation studies, operation 
and maintenance of the dam and public use facilities, 
and preparation of plans and specifications for gaging 
tower. 
Maintenance by contract consisted of placing single 
bituminous surfacing on roadways and parking areas 
over a distance of 7.6 miles. Work was initiated August 
15 and completed August 30, 1969. (See table 11-G for 
reservoir operations.) 
Number of visitor-days of recreational use, 4,919,545 
(calendar year 1969). 
Condition at end offiscalyear. Construction commenced 
in January 1955 and was completed in June 1960, 
except completion of real estate activities and con- 
401

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
struction under Code 710. The project is 91 percent 
complete. 
38. LAKE PONTCHARTRAIN AND 
VICINITY, LA. (HURRICANE 
PROTECTION) 
Location. In southeastern Louisiana, vicinity of New 
Orleans, in St. Charles, Jefferson, Orleans, St. Bernard 
and St. Tammany Parishes, comprising lower land and 
water area between Mississippi River alluvial ridge 
and the Pleistocene escarpment to north and west. The 
dominant topographic feature is Lake Pontchartrain, a 
shallow landlocked tidal basin, about 640 square miles 
in area and averaging 12 feet deep, connecting with 
lesser Lake Maurepas to the west and through Lake 
Borgne and Mississippi Sound to the gulf to the east. 
The lake drains about 4,700 square miles of tributary 
area. (See Geological Survey quadrangles Yscloskey 
and Malheureaux Point, Drum Bay, Door Point, Lake 
Eugenie, Oak Mound Bayou, Mitchell Keys, Lake 
Eloi, and Morgan Harbor; Engineer quadrangles 
Slidell, Covington, Ponchatoula, Springfield, Denham 
Springs, Donaldsonville, Mt. Airy, Bonnet Carre, 
Spanish Fort, Chef Menteur, Rigolets, St. Bernard, 
New Orleans, and Hahnville; and Coast and Geodetic 
Survey Charts 1115 and 1116.) 
Existing project. Provides for control of hurricane tides 
by construction of two independent units, the Lake 
Pontchartrain barrier plan and the Chalmette area 
plan. Lake Pontchartrain barrier plan involves construction 
of a barrier embankment along eastern 
boundary of the lake with navigation and hurricane 
tide control gates in Chef Menteur Pass and the 
Rigolets. These protective works, together with 
strengthening and extension of existing protective 
works and the construction of the Seabrook lock, will 
afford full protection to the south shore of Lake 
Pontchartrain from Bonnet Carre Spillway to the 
eastern limit of Orleans Parish levee along the Gulf 
Intracoastal Waterway and the Inner Harbor navigation 
canal. The Chalmette area plan consists of 
improving existing protection along east bank Inner 
Harbor navigation canal from the lock to Florida 
Avenue, then constructing a new levee to Mississippi 
River-Gulf Outlet, thence along south bank of gulf 
outlet to Bayou Lawler, then turning south and tying 
into Mississippi River levee at Violet, La. The 
approved Chalmette area plan was modified, under the 
discretionary authority of the Chief of Engineers, to 
provide for enlargement of the protected area by 
construction of a levee from the Mississippi River levee 
near Caernarvon, La., to the vicinity of Verret, La., 
thence to and along the Mississippi River-Gulf Outlet 
to a junction with the approved levee at the Bayou 
Lawler crossing of the Mississippi River-Gulf Outlet, 
and elimination of the levee in the approved plan from 
the Bayou Lawler and Mississippi River-Gulf Outlet to 
Violet, La. Appropriate drainage structures will be 
provided at Bayous Bienvenue and Dupre. Strengthening 
existing seawall at Mandeville on the north shore 
will insure that future hurricanes will not seriously 
damage this resort community. Estimated cost for new 
work (July 1970) is $148,838,000 Federal and 
$67,162,000 non-Federal, including cash contribution 
of $34,432,000 for construction and an additional cash 
contribution of $3,816,000 estimated to be capitalized 
value of operation and maintenance of Rigolets 
navigation lock and appurtenant channel. 
Local cooperation. Provide all rights-of-way; bear 30 
percent of first cost, consisting of fair market value of 
providing all lands, easements, and rights-of-way, 
including borrow and spoil disposal areas for construction, 
alter and relocate roads, railroads, pipelines, 
cables, wharves, drainage structures, and other facilities; 
provide a cash contribution estimated at 
$34,432,000; provide an additional cash contribution 
of $3,816,000 estimated to be capitalized value of 
operation and maintenance of Rigolets navigation lock 
and appurtenant channel; maintain and operate all 
works after completion; and hold the United States free 
from damages. The Governor of Louisiana designated 
the Louisiana Department of Public Works as agency 
to coordinate efforts of local interests to see that local 
commitments are carried out promptly. The Orleans 
Levee District executed an acceptable Act of Assurance 
on July 27, 1966, for entire barrier plan and that 
portion of the Chalmette Area plan in Orleans Parish. 
The Lake Borgne Basin Levee District and St. Bernard 
Parish Police Jury executed an Act of Assurance jointly 
on August 16, 1966, for the Chalmette Area plan in St. 
Bernard Parish. On March 13, 1967, supplemental 
assurances were requested of the Lake Borgne Basin 
Levee District and the St. Bernard Parish Police Jury 
to cover additional areas for hurricane protection in St. 
Bernard Parish. Supplemental assurances were adopted 
on June 6, 1967. 
Operations and results during fiscal year. Preparation of 
design memorandums and plans and specifications 
continued by hired labor and contract. Four design 
memorandums were completed and preparation of an 
additional seven is underway. 
New work by contract: In the New Orleans East unit 
three contracts providing for modification of 2.6 miles 
of levee, construction of 5.3 miles of first lift levees, and 
construction of 3.1 miles of reinforced concrete floodwalls, 
were continued from the previous year and 
completed with work accomplished this fiscal year as 
follows: From Hayne Boulevard to U. S. Highway 90 
and from Almonaster Avenue to Florida Avenue, along 
Inner Harbor navigation canal west levee, completed 
November 5, 1969 with 2.6 miles of levee modified and 
0.8 mile floodwall constructed; Citrus back levee in 
Orleans Parish from Station 196+00 to 431+00, 
completed May 14, 1970, with 3.0 miles of first lift levee 
constructed, and Citrus back levee in Orleans Parish 
from Station 510+ 20 to 582 + 96, completed April 17, 
1970, with only cleanup accomplished this fiscal year. 
402

NEW ORLEANS, LA., DISTRICT 
Driving and testing concrete vertical piles, on east 
and west levees along Inner Harbor navigation canal 
from Lake Pontchartrain to Florida Avenue, was 
accomplished between July 22 and October 1, 1969. 
Along Citrus back levee from Station 512+00 to 
571+ 50, 1.1 miles of foreshore protection was constructed 
with the placement of 16,000 tons of riprap 
during the period January 19 to February 25, 1970. 
In the Chalmette Area, Orleans Parish, from Inner 
Harbor navigation canal lock to Florida Avenue, 
construction of 1.1 miles reinforced concrete I-type 
floodwall on existing steel sheet piling and levee 
modification was started February 16, 1970, and is 79 
percent complete. All first lift monoliths have been 
completed to provide 1.1 miles of interim protection to 
elevation 12 feet mean sea level. About 35 of the 189 
second lift monoliths have been placed. 
Four contracts were awarded, but work not started, 
to provide for modification of levees and construction of 
3.5 miles of floodwalls as follows: Along Inner Harbor 
navigation canal, east side, from Dyer Road to U. S. 
Highway 90, Station 82+ 94 to 121+ 78; along Inner 
Harbor canal, east side, from U. S. Highway 90 to 
Mississippi River-Gulf Outlet, Station 122+00 to 
178+00; Inner Harbor canal, west side, from U. S. 
Highway 90 to Almonaster Avenue, Station 105 + 66 to 
167+ 00; and Citrus back levee, Station 431 + 00 to 
492 + 50. 
Four contracts were awarded, but work not started, 
to provide for the construction of 12.6 miles of first lift 
levees as follows: in the Chalmette Area, Orleans 
Parish, from Station 65+00 to 355+ 00; Chalmette 
Area, St. Bernard Parish, from Station 770+00 to 
995+ 00, Chalmette Area, St. Bernard Parish, from 
Station 995+ 00 to 1119+ 50, and Citrus back levee 
from Station 492+ 50 to 512+ 80. 
Condition at end of fiscalyear. Construction started May 
1967, and is 8 percent complete with 3.9 miles of 
reinforced concrete floodwalls, and 5.3 miles of first lift 
levees completed in the New Orleans East area, and 6.7 
miles of first lift levees completed in the Chalmette 
area. 
Work under contract at the end of the fiscal year 
provides for construction of an additional 3.5 miles of 
floodwalls and 12.6 miles of first lift levees as above 
indicated. 
39. LAKE TEXARKANA, TEX. 
Location. On Sulphur River in Cass and Bowie 
Counties, Tex. Dam is 45 miles above mouth of 
Sulphur River, and about 8 miles southwest of 
Texarkana, Tex. 
Existing project. An earthfill dam 18,500 feet long and 
100 feet high, including a spillway 200 feet wide and 
outlet works with a capacity of 27,600 cubic feet per 
second. Reservoir controls runoff from 3,400 square 
miles of drainage area, and has a storage capacity of 
2,654,300 acre-feet, of which 145,300 acre-feet are for 
conservation and remainder of flood control. Estimated 
cost for new work (July 1970) is $42,600,000 which 
includes $2,165,300 Code 710, $399,939 accelerated 
public works funds, and $8,011,404 to be reimbursed 
by local interests, over a period not to exceed 50 years, 
for water supply storage, and including $1,997,604 for 
prorata share of original reservoir cost. 
Local cooperation. None required. 
Operations and results during fiscal year. New work by 
hired labor under Code 710 consisted of preparation of 
plans and specifications for construction of three 
comfort stations. 
Maintenance by hired labor consisted of operation 
and maintenance of dam and reservoir area. (See table 
11-G for reservoir operations.) 
Number of visitor-days of recreational use, 2,515,869 
(calendar year 1969). 
Condition at end offiscalyear. Construction was initiated 
in August 1948 and completed in March 1962, except 
real estate activities, construction under Code 710, and 
conversion of 120,000 acre-feet to water supply storage 
after completion of Cooper Reservoir. 
40. MANIECE BAYOU, ARK. 
Location. Maniece Bayou drainage area of 88 square 
miles is on left bank of Red River in Lafayette County, 
Ark., from 3 to 5 miles wide, about 25 miles long, and 
roughly parallels Red River. Maniece Bayou enters 
Red River at mile 366.5 (1950-51 mileage). Maniece 
Bayou, below mile 5, flows through a deteriorated bed 
of an ancient Red River meander, characterized by a 
typical alluvial ridge on each side of the stream. Main 
line Red River levee ties into right bank ridge at about 
mile 3.6. At this point channel lies along base of 
escarpment. Above mile 8 the bayou is poorly defined 
and traverses a low swamp area. Inadequate outlet 
capacity of Maniece Bayou results in impoundment in 
swamp for extended periods during rainy season with 
resulting impairment of drainage on surrounding 
improved lands and periodic overflow of these lands 
during moderate storms. 
Existing project. Diversion of Maniece Bayou through 
enlarged existing channels and land cuts to enter Red 
River at mile 362.3, for snagging and clearing existing 
channel between Red River and mile 0.47, and 
channel enlargement and realinement between mile 
0.47 and 8. This plan was modified to include 
enlargement and realinement of Maniece and Field 
Bayous below mile 22.7, including further channel 
enlargement of Maniece Bayou below mile 8 beyond 
that already authorized, provides for a low water dam 
near end of existing left-bank Red River levee, 
extension of levee by a spoil bank for 3.5 miles to mouth 
of Maniece Bayou, and construction of an appurtenant 
interceptor drainage ditch. Cost of new work, completed 
in 1969, was $970,932 Federal, and $39,293 
contributed funds. 
Local cooperation. Fully complied with. 
403

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. The remaining 
cleanup and dressing of spoil under contract for 
channel enlargement and realinement, mile 7.88 to 
22.47 was accomplished and contract was completed 
August 18, 1969. 
Condition at end of fiscal year. Construction of the 
original authorization was accomplished from July 
1958 to April 1959, with lower 8 miles of Maniece 
Bayou cleared, realined, and enlarged. 
Construction under modification of July 14, 1960, 
was initiated May 22, 1966, and was completed August 
18, 1969. 
41. MISSISSIPPI RIVER DELTA AT AND 
BELOW NEW ORLEANS, LA. (NEW 
ORLEANS TO VENICE, LA., 
HURRICANE PROTECTION) 
Location. Includes land subject to inundation by 
hurricane tides extending on both banks of Mississippi 
River from vicinity of city of New Orleans to Gulf of 
Mexico. 
Existing project. Provides for improvements along 
Mississippi River below New Orleans, La., for prevention 
of hurricane tidal flood damages by increasing 
heights of existing back levees and modifying existing 
drainage facilities where necessary in three separate 
reaches: City Price to Empire, 15 miles, 4,340 acres 
protected; Empire to Venice, 21 miles, 4,900 acres 
protected; and Phoenix to Bohemia (construction 
initiated by local agency), 16 miles, 5,470 acres 
protected. 
Estimated cost of new work (July 1970) is 
$29,600,000 Federal and $20,300,000 non-Federal, 
including $16,100,000 cash contributions or equivalent 
work. 
Local cooperation. Local interests must furnish lands 
and rights-of-way for construction and future maintenance; 
provide alterations to facilities, and maintain 
and operate project after completion; contribute in 
cash or equivalent work not less than 30 percent of total 
project cost; and hold the United States free from 
damages. Plaquemines Parish furnished assurances for 
reaches "A", "B", and "C", and they have been 
accepted. 
Operations and results during fiscal year. New work by 
hired labor: Planning and studies for the project 
continued. Plans and specifications for first lift levee 
extension, Station 104 + 70 to 340 + 20 (Empire floodgate 
to Buras), Reach B-1, were completed. Contract 
was awarded, but work has not yet started. Plans and 
specifications for second lift levee, Station 0+00 to 
98+55, were initiated and are about 40 percent 
complete. 
Condition at end offiscal year. Construction was initiated 
September 1968, and is 6 percent complete, with 1.9 
miles of first lift levee embankment completed. 
Construction of Reach C has been completed by local 
interests. 
42. MORGAN CITY AND VICINITY, LA. 
(HURRICANE PROTECTION) 
Location. In south central Louisiana, Morgan City 
proper and the adjacent areas. It includes the land 
south of Grand Lake, Six Mile Lake, and Lake 
Palourde extending from Morgan City westward to 
Charenton drainage and navigation canal. Lower 
Atchafalaya River and Wax Lake Outlet, the principal 
outlets for Atchafalaya Basin Floodway traverse the 
area. Gulf Intracoastal Waterway crosses the area in an 
east-west direction. Numerous bayous and artificial 
canals excavated for drainage purposes or for access to 
oil developments exist throughout the area. (See 
Engineer quadrangles Bayou Sale, Jeanerette, Foster, 
Belle Isle, Point Au Fer, Morgan City, and Lake 
Decade; and Coast and Geodetic Survey Chart 1116.) 
Existing project. Morgan City: Construction of about 
5.6 miles of new levees along shore of Lake Palourde 
and west bank of Bayou Ramos and about 0.5 mile of 
new levee from Southern Pacific railroad embankment 
near Wyandotte to tie in with Bayou Boeuf lock levee, 
and construction of three gravity drainage structures. 
Franklin and vicinity: Enlargement of about 21.6 miles 
of back levee and construction of about 3.1 miles of new 
levees to effect a complete closure of area to be 
protected, construction of one floodgate and five 
gravity drainage structures, and alteration of existing 
drainage facilities where necessary. Normal range of 
tide is 1.6 feet. Storm and hurricane tides have 
produced elevations up to 10 feet while northerly 
storms during winter depress the gulf level as much as 3 
feet below mean sea level. During low water periods on 
Atchafalaya River, generally September through 
November, the effect of tide extends about 35 miles 
above Morgan City. Estimated cost for new work (July 
1970) is $4,960,000 Federal and $2,250,000 non- 
Federal including $430,000 cash contributions. 
Local cooperation. Local interests must furnish lands, 
easements, and rights-of-way for construction and 
future maintenance, provide relocations and alterations 
required for project; provide all interior 
drainage and pumping plants required for reclamation 
and development of protected areas; maintain and 
operate all project works after completion, provide 
assurances that encroachment on existing ponding 
areas will be prevented unless substitute storage 
capacity or equivalent pumping capacity is provided 
promptly, without cost to the United States; contribute 
in cashject cost, the final determination to be made 
after construction is complete; and hold the United 
States free from damages due to construction works. 
Assurances were furnished by the St. Mary Parish 
Police Jury and accepted by the United States on July 
18, 1968. 
Operations and results during fiscal year. Hired labor 
forces and an architect-engineer firm continued studies 
and investigations in connection with preparation of 
two general design memorandums, one for the Morgan 
404

NEW ORLEANS, LA., DISTRICT 
City (subareas A & B) unit and one for the Franklin 
and vicinity unit. These memorandums are 70 percent 
and 95 percent complete, respectively. 
Condition at end of fiscal year. Construction has not 
commenced. 
43. RED RIVER BELOW DENISON DAM 
(NEW ORLEANS DIST.) 
Location. On Red River and its tributaries below 
Denison Dam, in Oklahoma, Arkansas, Texas, and 
Louisiana. (See Geological Survey State maps and folio 
"Maps of Red River"-1958 edition.) 
Existing project. Flood Control Act of 1946 approved 
general plan for flood control on Red River below 
Denison Dam, Tex. and Okla., which provides for 
construction of six flood control reservoirs in combination 
with existing or authorized Federal and non- 
Federal levee improvements, modified as required, and 
channel stabilization at locations where levee setbacks 
are impossible or uneconomical. This act further 
authorized incorporation of several separate existing 
projects for flood control along Red River below 
Denison, above jurisdiction of Mississippi River Commission, 
into this project. By Public Law 780, 83d 
Congress, 2d session, as amended by Public Law 218, 
84th Congress, 1st session, and Public Law 645, 86th 
Congress, 1st session plan of improvement was amended 
to include additional projects as indicated in 
following lists of reservoirs and local protection works 
considered in general flood control plan for the Red 
River below Denison Dam, and existing flood control 
projects incorporated into project in New Orleans 
District. (See Table 11-H for new projects and Table 
11-I for incorporated projects.) 
Local cooperation. See individual reports. 
44. RED RIVER BELOW DENISON DAM, 
LEVEES AND BANK STABILIZATION 
(NEW ORLEANS DIST.) 
Location. Along both banks of Red River from 
vicinity of Index, Ark., mile 497, to latitude of 
Alexandria, La., mile 121 (1938 survey) on north bank, 
and to latitude of Boyce, La., mile 141, on south bank. 
Existing project. Provides for modification as required 
of existing or authorized Federal and non-Federal levee 
improvements for conveyance of peak flows of design 
flood with a minimum freeboard of 3 feet, except where 
a 3-foot superiority for "South Bank Red River Levee" 
is presently prescribed; and for extension of channel 
stabilization program envisaged by existing project, 
"Red River in the Vicinity of Shreveport, La.," by 
construction of bank protection works at locations 
where levee setbacks are impossible or uneconomical, 
and to prevent disruption to transportation facilities 
when threatened by caving banks, all between Denison 
Dam and upper limit of Mississippi River backwater, 
below which is under jurisdiction of Mississippi River 
Commission. Estimated cost for new work (July 1970) 
is $25,100,000 Federal and $300,000 non-Federal, 
including $100,000 contributed funds. 
Recommended modifications. That the existing project 
for the Red River below Denison Dam, as it pertains to 
the Posten Bayou, Arkansas-Louisiana area, be modified 
to delete the plan of improvement authorized for 
that area by the Flood Control Act of August 3, 1955, 
and to provide in lieu thereof for headwater flood 
protection by construction, in combination with 
upstream drainage improvements by others, of a major 
outlet consisting of about 2.5 miles of diversion channel 
with related control structure and levees, from Posten 
Bayou to Red River just north of the Arkansas- 
Louisiana State line. 
Local cooperation. Local interests must furnish lands, 
easements, rights-of-way, and spoil disposal areas 
necessary for construction; hold the United States free 
from damages; and maintain and operate works after 
completion. Local interests have been prompt in 
furnishing levee rights-of-way upon request, except for 
the following three items of low priority: McKinney 
Bayou Drainage District, enlargement of approximately 
4 miles of intermittently low levee; 
Garland Levee District, enlargement of approximately 
1.3 miles of levee; and Red River Levee District No. 1, 
enlargement of approximately 4.3 miles of levee. 
The local agencies are convinced that the flow line 
lowering produced by complet. d reservoirs has made 
this work unnecessary. 
Operations and results during fiscal year. Hired labor 
forces continued investigations, surveys, preparation of 
plans and specifications, and real estate activities. 
Contract work consisted of hydrographic surveys 
and construction of bank protection works. Construction 
of board mattress revetment at Cupples 
Landing, La., R-259.3-R, which started last fiscal year, 
was completed on September 17, 1969, with 2,500 
linear feet of bank protected. This work involved 
constructing 2,105 squares of lumber mattress and 
placing 16,232 tons of stone on mattress and upper 
bank paving. 
A total of 31,762 tons of stone was placed in 
construction of a stone dike system of 6 dikes and 200 
linear feet of bankhead paving at Williams, La., D- 
238.5-R, during the period November 12, 1969, to June 
11, 1970. 
Construction of board mattress at Grand Ecore, R- 
185.6-L, started January 6, 1970, and is about 19 
percent complete. Work was suspended most of the 
fiscal year due to high river stages. 
Condition at end offiscalyear. Construction was initiated 
in February 1948 and is 55 percent complete, with 
approximately 149 miles of left bank and 235 miles of 
right bank levees improved. About 24 miles of banks 
are protected with stone and pile dikes, standard board, 
riprap trenchfill revetments, and three cutoffs. 
405

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
45. WALLACE LAKE, LA. 
Location. In Red River Basin on Cypress Bayou, 
Caddo and De Soto Parishes, La., 66 miles above 
mouth of Bayou Pierre and about 14 miles southeast of 
Shreveport, La. (See Geological Survey State map, 
scale 1:500,000.) 
Existing project. An earthfill dam 4,940 feet long at 
top, including 644 feet of spillway and outlet works, 
rising 48 feet above streambed, with a reservoir 
providing storage of 96,100 acre-feet, including a 
conservation pool of 7,800 acre-feet. Outlet works and 
uncontrolled spillway are centered about 1,250 feet 
north of south abutment. Reservoir controls 260 square 
miles, or about 20 percent of total drainage area of 
Bayou Pierre, Cypress Bayou, and tributaries combined, 
and affords protection against floods for an area 
of about 90,000 acres of valley below dam. Cost for new 
work is $1,219,371, including $17,164 for Code 710. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Hired labor 
continued operation and ordinary maintenance of the 
dam. (See table 11-G for reservoir operations.) 
Number of visitor-days of recreational use, 343,421 
(calendar year 1969). 
Condition at end of fiscal year. All construction work on 
project was completed in December 1946, except 
construction under Code 710. 
Main portion of dam was constructed during fiscal 
year 1943; stabilization of railroad embankment was 
accomplished from June to November 1946; and 
placing of fill in closure section of dam was accomplished 
from November to December 1946. 
46. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspection of completed flood control projects along 
the Red River from the northern boundary of the 
District to Alexandria, La., was performed by personnel 
of the flood-fight organization during the month 
of December 1969. Flood-fight sectors included in this 
area are the Arkansas, Shreveport, and Middle Red 
which contain a total of 438 miles of levee. The 
Sulphur River Sector which contains numerous relatively 
short and discontinuous levees along the 
Sulphur River was inspected in November by the 
Sector Commander. 
All of the above levees and other flood control 
projects were included in the joint annual inspection 
with local interests during the months of September 
and October 1969, and were spot inspected at various 
times during the year on an as needed basis. 
Fiscal year costs were $12,528. Total costs to June 30, 
1970, were $107,815. 
47. OTHER AUTHORIZED FLOODCONTROL 
PROJECTS 
(See table 11 -J.) 
48. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 
858, 80th Congress, as amended (preauthorization). 
Preauthorization studies for fiscal year cost $38,426 
for Brush Bayou, Caddo Parish, La. 
Emergency Flood Control Activities--Repair, Flood Fighting, 
and Rescue Work (P.L. 99, 84th Cong., and antecedent 
legislation). 
(See table 11-K.) 
GENERAL INVESTIGATIONS 
49. SURVEYS 
Cost of work during fiscal year was $296,515, of 
which $57,058 was for five navigation studies, $147,630 
for eight flood control studies, $24,051 for a beach 
erosion study, $17,719 for two special studies (including 
coordination with other agencies), and $50,057 for a 
comprehensive basin study. 
50. COLLECTION AND STUDY OF BASIC 
DATA 
Flood plain information studies as authorized by 
Section 206, 1960 Flood Control Act, as amended, 
comprise compilation and dissemination, upon the 
request of a State or a political subdivision thereof, of 
information on floods and flood damages, including 
identification of areas subject to inundation by floods of 
various magnitudes and frequencies, and general 
criteria for guidance of Federal and non-Federal 
interests and agencies in the use of flood plain areas; 
and provide advice to other Federal agencies and local 
interests for their use in planning to ameliorate the 
flood hazard. Fiscal year costs of $147,918 for flood 
plain management services are set forth in Table 11-L 
at end of chapter. (See also table 11-M for completed 
flood plain information reports and table 11-N for 
special flood hazard information reports.) 
51. RESEARCH AND DEVELOPMENT 
Hydrological studies were made during the fiscal 
year at a cost of $1,388. 
406

TABLE 11-A 
See 
Section 
NEW ORLEANS, LA., DISTRICT 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
$434,900 $458,000 $ 345,000 $ 333,000 
466,566 462,048 338,633 336,564 
- - - 50,000 
- - - 4,866 
in Text Project 
1. Aquatic Plant 
Control Program 
2. Atchafalaya River, 
Bayous Chene, Boeuf, 
and Black, La. 
3. Atchafalaya 
River, Morgan 
City to Gulf of 
Mexico, La. 
4. Barataria Bay 
Waterway, La. 
5. Bayou Lafourche 
and Lafourche- 
Jump Waterway, La. 
6. Bayous La Loutre 
St. Malo, and 
Yscloskey, La. 
7. Bayou Queue 
de Tortue, La. 
8. Bayou Segnette, 
Waterway, La. 
9. Bayou Teche & 
Vermilion 
River, La. 
10. Bayou Teche, 
La. 
11. Calcasieu River 
and Pass, La. 
Funding 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
398,785 
398,819 
-150 
203,050 
4,205 
50,983 
16,000 
17,287 
49,000 
45,725 
1,425,000 
1,406,387 
232,161 1,271,300 2,347,700 
66,135 1,437,025 1,128,384 
328,700 
164,020 
401,400 
338,760 
-34,000 
27,291 
3,600 
2,202 
15,000 
15,603 
39,200 
44,975 
1,214,200 
1,250,158 
407 
354,000 
309,360 
470,000 
524,700 
30,000 
15,894 
15,000 
11,934 
50,000 
14,643 
25,000 
39,000 
20,485 
81,000 
49,168 
189,500 
176,367 
475,000 
513,423 
250,000 
184,054 
50,000 
9,443 
39,200 
29,522 
40,000 
1,656 
-1,461 
23,539 
75,000 
22,048 
17,900 
25,395 
66,200 
100,288 
-4,214 
12,036 
2,020,600 
3,101,778 
$4,400,8001 
4,393,5642 
50,000 
4,866 
501,963 
501,963 
4,503,184 
4,332,250 
1,572,6853 
1,572,685 
1,677,3984 
1,603,5114 
1,477,0245 
1,422,1645 
786,5636 
772,4216 
96,916 
96,916 
297,316 
223,616 
33,355 
33,355 
28,315 
28,315 
238,828 
238,828 
82,322 
29,370 
2,891,922 
2,891,922 
744,454 
733,290 
754,3307 
754,330 
2,048,475 
2,047,2828 
27,807,3109 
27,807,310 
13,421,61110 
13,282,97910 
Se

TABLE 11-A (Continued) 
See 
Sect ion 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
) COST AND FINANCIAL STATEMENT 
in Text Project Funding 
12. Calcasieu River New Work 
salt-water Approp. 
barrier, La. Cost 
13. Freshwater New Work 
Bayou, La. Approp. 
Cost 
Maint. 
Approp. 
Cost 
14. Gulf Intracoastal New Work 
Waterway between Approp. 
Apalachee Bay, Cost 
Fla., & Mexican Maint. 
Border Approp. 
(N.O. Dist.) Cost 
15. Houma navigation Maint. 
canal, La. Approp. 
Cost 
16. Mermentau River, New Work 
Bayou Nezpique and Approp. 
Bayou Des Cannes, Cost 
La. Maint. 
Approp. 
Cost 
17. Mermentau River, New Work 
La. Approp. 
Cost 
Maint. 
Approp. 
Cost 
18. Mississippi River, New Work 
Baton Rouge to the Approp. 
Gulf of Mexico, La. Cost 
Maint. 
Approp. 
Cost 
19. Mississippi River- New Work 
Gulf Outlet, La. Approp. 
(Regular Funds) Cost 
Maint. 
Approp. 
Cost 
(Contrib. Funds) New Work 
Contrib. 
Cost 
20. Mississippi River- New Work 
Gulf Outlet, Approp. 
Michoud Canal, La. Cost 
21. Overton-Red River New Work 
Waterway, La. Approp. 
Cost 
22. Petit Anse, Tigre, New Work 
and Carlin Bayous, Approp. 
La. Cost 
Maint. 
Approp. 
Cost 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
$1,865,000 
1,616,625 
1,610,000 
1,710,294 
2,384,223 
2,309,743 
95,634 
96,286 
85,000 
35,095 
122,700 
124,234 
3,106,000 
2,937,513 
2,267,000 
2,809,492 
4,837,898 
4,876,396 
64,000 
42,717 
$134,000 $-25,000 
379,171 388 
2,525,000 131,000 
2,275,604 383,681 
11,100 146,500 
11,064 145,445 
- 25,0001 
- 24,5491 
2,619,850 2,980,500 
2,629,657 3,060,107 
275,000 305,000 
218,843 231,019 
122,000 -1,000 
106,072 26,934 
127,500 288,000 
123,788 225,503 
3,890,000 4,415,000 
3,980,649 4,612,437 
1,500,000 463,000 
889,790 1,105,677 
1,374,000 1,770,500 
1,097,315 1,630,002 
253,000 
36,024 
743,000 
481,612 
140,000 
14,814 
$ 740 
1,675 
55,224 
63,807 
347,600 
174,066 
70,000 
47,712 
2,882,000 
2,702,998 
132,500 
97,140 
11,941 
315,600 
256,818 
6,325,000 
5,529,459 
800,000 
332,245 
8,813,988 
6,864,697 
47,248 
15,000 
10,891 
200,000 
146,230 
107,643 
232,829 
$4,022,740 
4,022,740 
7,116,22411 7,116,2241 
505,200 
330,575 
62,649,52513,14,15 
62,626,78613,14,1 5 
53,794,13716 
53,555,96016 
1,335,634 
1,170,136 
263,555 
237,596 
114,51918 
114,519 
4,631,91019 
4,631,91019 
3,374,16220 
3,247,592 
34,916,99721 34,916,997 
84,265,55822 
83,464,976 
62,996,000 
62,510,112 
19,857,286 
17,465,393 
682,97723 
682,977 
15,000 
10,891 
1,737,522 
1,172,311 
339922,,224472244 
392,247 
565,053 
565,053 
408

TABLE 11-A (Continued) 
NEW ORLEANS, LA., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
23. Red River below New Work 
Fulton, Ark. Approp. 
Cost 
24. Removing Water- 
Hyacinth (Louisiana) 
25. Waterway from 
Empire, La., to 
Gulf of Mexico 
29. Bayou Bodcau 
and Tributaries, 
Ark. & La. 
30. Bayou Bodcau 
Reservoir, La. 
31. Bayou Pierre, La. 
32. Caddo Lake, La. 
33. Cooper Lake and 
Channels, Tex. 
34. Garland City, Ark. 
35. Grand Isle and 
vicinity, La. 
(hurricane 
protection) 
36. Harvey Canal, 
Bayou Barataria 
Levee, La. 
37. Lake O' the Pines, 
Tex. 
38. Lake Pontchartrain 
and vicinity, La. 
(hurricane 
protection) 
(Regular Funds) 
(Contrib. Funds) 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
$-
3,993 
4,020 
300,000 
290,393 
8,000 
5,550 
150,000 
34,197 
12,60026 
15,0422 
42,100 
45,457 
5,500 
6,035 
93,000 
96,775 
-4,000 
75,966 
225,000 
257,614 
200,000 
13,526 
115,900 
136,974 
245,062 
246,897 
1,600,000 
1,645,425 
500,000 
254,455 
18,000 
16,707 
306,000 
326,108 
-200 
2,237 
150,000 
162,939 
18,00026 
2,1102 
35,850 
40,111 
14,300 
14,521 
310,000 
79,806 
209,218 
99,000 
158,382 
125,000 
244,882 
41,360 
16,854 
66,000 
55,071 
259,400 
270,792 
4,086,000 
2,666,288 
$-- 
10,000 
3,804 
355,000 
344,582 
1,000 
730 
39,000 
48,701 
3,00026 
11,6722 
42,200 
40,190 
22,100 
13,256 
900,000 
1,154,431 
285,000 
354,273 
7,000 
7,058 
83,000 
51,182 
137,000 
12,657 
70,000 
49,168 
302,300 
277,570 
6,269,000 
4,923,573 
219,743 
7,200 
4,842 
325,000 
333,291 
102,500 
15,377 
46,662 
1,00026 
5,3122 
50,000 
43,342 
20,000 
25,049 
1,350,000 
1,156,366 
500,000 
405,932 
200,000 
7,650 
13,816 
650,000 
1,49 5 
49,716 
46,443 
323,000 
310,909 
5,260,000 
2,359,906 
25,802 
$1,963,80625 
1,963,8062 5 
2,028,808 
2,018,837 
8,216,108 
8,213,337 
1,068,142 
1,068,142 
408,884 
321,479 
339,000 
292,499 
4,208,44027 
4,204,08828 
545,307 
536,611 
299,52929 
299,529 
351,210 
347,264 
2,733,000 
2,536,152 
4,599,000 
4,423,091 
1,205,000 
1,010,649 
408,000 
323,416 
847,002 
49,649 
13,431,664 
13,370,177 
2,442,867 
2,396,430 
17,753,000 
12,078,611 
500,000 
500,000 
409

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 11-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
39. Lake Texarkana, New Work 
Tex. Approp. $93,400 $66,000 $55,000 $28,829 $35,074,04332 
Cost 71,753 88,089 27,193 6,968 35,016,24633 
Maint. 
Approp. 306,200 303,250 339,100 389,000 3,415,240 
Cost 305,253 307,691 322,622 362,071 3,365,848 
40. Maniece Bayou, New Work 
Ark. (Regular Approp. 250,000 283,000 28,500 -81 970,932 
Funds) Cost 179,075 159,924 412,580 3,977 970,932 
(Contrib. Funds) New Work 
Contrib. - - - -2,007 39,293 
Cost - 31,674 7,840 -221 39,293 
41. Mississippi River New Work 
Delta at and below Approp. 250,000 160,000 950,000 300,000 1,9 54,000 
New Orleans, La. Cost 105,374 52,183 982,430 368,376 1,801,999 
(New Orleans to 
Venice, La., hurricane 
protection) 
42. Morgan City and New Work 
vicinity, La., (hur- Approp. 140,000 125,000 82,000 150,000 497,000 
ricane protection) Cost 5,445 174,180 108,332 56,658 344,615 
44. Red River below New Work 
Denison Dam, Levees Approp. 1,890,000 690,000 627,000 800,000 14,271,00034 
and bank stabili- Cost 247,943 1,882,194 895,527 618,548 13,857,31734 
45. Wallace Lake, La. New Work 
Approp. - - - - 1,219,37135 
Cost - - - - 1,219,37135 
Maint. 
Approp. 18,438 21,200 22,100 30,000 355,100 
Cost 16,710 20,682 21,725 24,840 347,313 
1. Includes $460,000 for Code 740. 
2. Includes $455,567 for Code 740. 
3. Includes $73,037 for previous project. Excludes $2,000 
contributed funds expended. 
4. Includes $47,551 for previous project. 
5. Includes $252,935 for previous projects; excludes 
$75,563 expended for rehabilitation (Code 820) in FY 61. 
6. Includes $15,445 for previous projects. 
7. Includes $45,704 for previous projects. 
8. Includes $91,389 permanent indefinite appropriation. 
9. Includes $495,914 for previous project; excludes- 
$107,837 expended for minor rehabilitation in FY 63. 
10. Includes $194,851 for previous project. 
11. Excludes $16,060 contributed funds. 
12. AE&D funds for replacement of Vermilion lock. 
13. Includes $4,320,698 for new work on previous project. 
Included in these totals are $353,541 N.I.R.A. funds (new 
work); and $1,070,433 permanent indefinite appropriation. 
Included is repayment of advance funds for construction of 
Franklin Canal in the amount of $35,103. In addition, 
$1,413,133 was expended for transfer to drainage district of 
ownership of Plaquemines Parish pumping station, and drainage 
canals and all drainage responsibility and obligations vested in 
the United States by P.L. 14, 79th Congress, 1st session. 
14. Excludes contributed funds of $340,159. 
15. Inner Harbor navigation canal lock was constructed at a 
cost of $8,648,492 (non-Federal). 
16. Includes $454,259 for maintenance and $548,948 for 
operation and care for previous project, including $75,000 from 
appropriation for maintenance and operation of dam and other 
improvements of navigable waters. Excludes $7,005 contributed 
funds. 
17. Includes $57,555 ($29,974 of which was from Public 
Works funds) for new work on previous project. 
18. Includes $114,519 for maintenance of previous project. 
19. Excludes $10,904 for new work on White Lake to Pecan 
Island section of existing project. 
20. Excludes $10,742 for maintenance on White Lake to 
Pecan Island section of existing project. Excludes $2,000 
contributed funds. Includes $13,163 of R&H funds and 
$109,714 accelerated public works funds. 
21. Includes $1,729,989 for previous project. 
22. Includes $169,055 for previous projects and $3,379,676 
from permanent indefinite appropriation. 
23. Contributed by Board of Commissioners, Port of New 
Orleans, for providing fill for future industrial sites adjacent to 
turning basin and for dredging cable and pipeline crossings. 
24. Includes $47,858 Public Works funds. 
25. Includes $1,553,878 for previous projects. 
26. Code 710. 
27. Includes $109,700 Code 710. 
28. Includes $105,348 Code 710. 
29. Includes $38,529 from emergency relief funds. 
30. Includes $664,186 for Code 710 and $399,739 
accelerated Public Works act funds. Excludes $1,711,200 
contributed funds. 
31. Includes $608,889 for Code 710, and $399,739 
accelerated Public Works act funds. 
32. Includes $684,750 for Code 710 and $399,939 
accelerated Public Works act funds. 
33. Includes $626,954 for Code 710, and $399,939 
accelerated Public Works act funds. 
34. Includes $212,105 expended by Tulsa District for cost of 
Index, Ark., Tex. unit. Excludes $100,000 contributed funds 
expended. 
35. Includes $17,164 for Code 710. 
410

NEW ORLEANS, LA., DISTRICT 
AUTHORIZING LEGISLATION 
Work Authorized 
July 3, 1958 
Oct. 23, 1962 
Oct. 27, 1965 
Aug. 13, 1968 
June 25, 1910 
July 3, 1958 
Aug. 30, 1935 
July 14, 1960 
Nov. 22, 1967 
Aug. 26, 1937 
Mar. 2, 1945 
AQUATIC PLANT CONTROL PROGRAM (See Section 1 of Text) 
Control and progressive eradication of water-hyacinth, 
alligatorweed, and other obnoxious aquatic plant growth 
from navigable waters in tributary streams, connecting 
channels, and other allied waters in southeastern United 
States. 
Research and planning costs prior to construction to be borne 
fully by the United States and not included in costs shared 
by local interests. 
Provides for comprehensive program for control and progressive 
eradication of water-hyacinth, alligatorweed, Eurasian 
water milfoil, and other obnoxious plant growths from 
navigable waterways, tributary streams, connecting channels, 
and other allied waters of the United States. 
ATCHAFALAYA RIVER, BAYOUS CHENE, BOEUF, AND BLACK, LA. 
(See Section 2 of Text) 
20-by 400-foot navigation channels connecting Gulf 
Intracoastal Waterway, Gulf of Mexico, and Bayous Chene, 
Boeuf, and Black 
ATCHAFALAYA RIVER, MORGAN CITY TO GULF OF MEXICO, LA. 
(See Section 3 of Text) 
A 20-by 200-foot channel from 20-foot contour in Gulf of 
Mexico 
BARATARIA BAY WATERWAY (See Section 4 of Text) 
A channel about 37 miles long with a 12-foot depth and 125- 
foot width from Gulf Intracoastal Waterway to Grand Isle, 
La., to mile 15.5 in Bayou St. Denis; a channel along 
western shore of Barataria Bay and through Barataria Pass 
to 12-foot depth contour in the gulf, with an extension 
of project to include westerly 4.3 miles of Bayou Rigaud. 
BAYOU LAFOURCHE AND LAFOURCHE-JUMP WATERWAY, LA. 
(See Section 5 of Text) 
Permanent closure of head of bayou, without a lock; a channel 
6 feet deep and 60 feet wide from Gulf Intracoastal Waterway 
at Larose to Gulf of Mexico by Belle Pass; closure of Pass 
Fourchon; and a jettied entrance at mouth of Belle Pass. 
Auxiliary channel 12 by 125 feet from Gulf Intracoastal 
Waterway (mile 37.2) to Bayou Lafourche vicinity Leeville 
12- by 125-foot channel improvement in Bayou Lafourche from 
Leeville to 12-foot contour in Gulf of Mexico; 9- by 100- 
foot channel improvement in Bayou Lafourche from Leeville 
to Golden Meadow; 12- by 125-foot channel from Leeville 
through Southwestern Louisiana Canal to and through Bayou 
Rigaud; and restore and extend jetties from 6- to 12-foot 
contour when justified to effect reduction in maintenance 
dredging. 
Bayou Lafourche, between Canal Boulevard in Thibodaux, 
Lafourche Parish, La., and the head of the bayou at its 
junction with the Mississippi River levee at Donaldsonville, 
Ascension Parish, La., is declared non-navigable. 
BAYOU LA LOUTRE, ST. MALO, AND YSCLOSKEY, LA. 
(See Section 6 of Text) 
A channel 5 feet deep and 40 feet wide from deep water in 
Lake Borgne to shoreline at mouth of Bayou Yscloskey; a 
channel 6 feet deep and 40 feet wide from deep water in Lake 
Borgne through Bayous St. Malo, La Loutre, and Eloi to deep 
water in Lake Eloi; and removal of obstructions from Bayou 
La Loutre between Hopedale and Bayou St. Malo. 
A channel 5 feet deep and 30 feet wide in Bayou La Loutre 
between Hopedale and Bayou St. Malo. 
411 
TABLE 11-B 
Acts Documents 
H. Doc. 37, 85th Cong., 1st sess. 
P.L. 874, 87th Cong., 2d sess. 
P.L. 298, 89th Cong., 2d sess. 
H. Doc. 155, 90 Cong., 1st sess. 1 
H. Doc. 669, 61st Cong., 2d sess. 
(latest published map 
accompanies H. Doc. 410, 56th 
Cong., 1st sess. 
H. Doc. 82, 85th Cong., 1st sess. 2 
H. Doc. 45, 73d Cong., 1st sess. 
H Doc. 112, 86th Cong., 1st sess. 2 
P.L. 90-149 
H. Doc. 275, 75th Cong., 1st sess. 
S. Doc. 116, 77th Cong., 1st 
sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 11-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 25, 1912 
Sept. 3, 1954 
Aug. 18, 1941 
Sept. 19, 1890 
Mar. 2, 1907 
Mar. 2, 1919 
June 26, 19343,4 
Aug. 26, 1937 
Mar. 2, 1945 
July 24, 1946 
July 14, 1960 
Oct. 23, 1962 
BAYOU QUEUE DE TORTUE, LA. (See Section 7 of Text) 
Removal of obstructions from mouth to the Southern Pacific 
Railroad Bridge at Riceville, La., and dredging 10 cutoffs, 
aggregating 1,765 feet in length. 
BAYOU SEGNETTE WATERWAY, LA. (See Section 8 of Text) 
A 9-foot channel below mean low Gulf level over a width of 
60 feet, from Company Canal to Bayou Villars. 
BAYOU TECHE AND VERMILION RIVER, LA. (See Section 9 of Text) 
A navigable channel 51 miles long and 8 by 80 feet from 
8-foot-depth contour in Vermilion Bay to Gulf Intracoastal 
Waterway, thence 9 by 100 feet to head of navigation (mile 
52) at Lafayette, La., with additional enlargement below 
Abbeville necessary to provide adequate capacity for 
floodflows. 
BAYOU TECHE, LA. (See Section 10 of Text) 
Improve stream from its mouth to St. Martinville by removing 
obstructions and dredging. 
Construct lock and dam and extend improvement to Arnaudville, 
La. 
Increase channel dimensions from mouth to Keystone lock. 
Operation and care of lock and dam provided for with funds 
from War Department appropriations for rivers and harbors. 
CALCASIEU RIVER AND PASS, LA. (See Section 11 of Text) 
Channel 30 by 250 feet from Lake Charles docks to gulf, repair 
and extent existing jetties to about 10-foot-depth contour, 
with a channel 30 by 250 feet between jetties; dredging 
approach channel 32 by 400 feet in gulf from sea ends of 
jetties to 32-foot-depth contour; and provision for extension 
of jetties to 15-foot-depth contour, if such action would be 
more economical than maintenance of approach channel by 
dredging. 
Channel 30 by 250 feet around Cooney Island. 
Channel depth of 35 feet from wharves of Lake Charles Harbor 
and terminal district, including Clooney Island Loop, to 
jetty channel, a uniformly increasing depth of 35 to 37 feet 
in jetty channel, and a depth of 37 feet in approach channel 
in Gulf of Mexico. 
An approach channel 42 by 800 feet from end of jetty to 
42-foot contour in gulf; a jetty channel 400 feet wide, 
varying from 40 feet deep at shoreline to 42 feet deep at 
seaward end of jetty; a channel 40 by 400 feet from shoreline 
(mile 0) to Port of Lake Charles (mile 34.4); enlarge 
existing turning basin at mile 29.6 to 40 feet deep; a 
mooring basin (mile 3) 350 by 2,000 by 40 feet; a 35- by 
250-foot extension of existing ship channel from port of 
Lake Charles (mile 34.4) to vicinity of U. S. Highway 90 
bridge; a turning basin at upper terminus, 750 by 1,000 by 
35 feet; and maintenance of 12- by 200-foot channel from ship 
channel to Cameron, La. 
Salt-water barrier structure with five tainter gates in a new 
bypass channel; a parallel channel with a navigation gate 
(sector type); a closure dam in existing channel of river; 
and revetment along a section of riverbank upstream from 
diversion channel to prevent a natural cutoff. (Improvement 
reported as Calcasieu River salt-water barrier, La.) 
H. Doc. 609, 61st Cong., 2d sess. 
(Latest published map is 
opposite page 2,466 of 1916 
Annual Report.) 
H. Doc. 413, 83d Cong., 2d sess. 2 
S. Doc. 93, 77th Cong., 1st sess. 2 
Annual Report, 1889, p. 1,532 
H. Doc. 527, 59th Cong., 1st 
sess. 
H. Doc. 1329, 62d Cong., 3d sess. 
H. Doc. 299, 75th Cong., 1st sess. 
H. Doc. 465, 77th Cong., 1st sess. 
S. Doc. 190, 79th Cong., 2d sess. 
H. Doc. 436, 86th Cong., 2d 
sess. 
H. Doc. 582, 87th Cong., 2d sess. 2 
412

TABLE 11-B (Continued) 
NEW ORLEANS, LA., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 23, 1962 
July 14, 1960 
Mar. 3, 1925 
Jan. 21, 1927 
July 3, 1930 
June 26, 19343,4 
July 23, 1942 
Mar. 2, 1945 
July 24, 1946 
July 24, 1946 
July 24, 1946 
Oct. 23, 1962 
CALCASIEU RIVER SALT-WATER BARRIER, LA. (See Section 12 of 
Text) 
Construct salt-water barrier structure with five tainter 
gates in a new bypass channel; a parallel channel with a 
navigation gate (sector type); a closure dam in existing 
channel of river; and revetment along a section of riverbank 
upstream from diversion channel to prevent a natural 
cutoff. 
FRESHWATER BAYOU, LA. (See Section 13 of Text) 
A new 12- by 125-foot channel from Gulf Intracoastal Waterway, 
mile 161.2 west of Harvey lock, to 12-foot contour in Gulf 
of Mexico near Freshwater Bayou, construction of an 84- by 
600-foot lock with a depth of 16 feet over sill near Gulf 
of Mexico; and construction of jetties from shoreline to 
6-foot depth contour in Gulf of Mexico, if maintenance 
dredging of channel without jetties proves to be more 
expensive than construction and maintenance of jetties. 
Until such determination has been made, offshore channel 
should be dredged and maintained to provide a 12- by 250- 
foot channel. In event jetties are provided, offshore 
section should then be maintained to 12- by 125-foot 
project in jettied reach, and 250 feet beyond. 
GULF INTRACOASTAL WATERWAY BETWEEN APALACHEE BAY, FLA., 
AND MEXICAN BORDER (NEW ORLEANS DISTRICT) (See Section 14 
of Text) 
Construct waterway from New Orleans, La., to Galveston 
Bay, Texas. 
Extension of waterway to Corpus Christi, Texas 
A channel 9 by 100 feet from Lake Pontchartrain to 
Mississippi Sound 
Operation and care of locks and dams provided for with funds 
from War Department appropriations for rivers and harbors. 
Enlarge waterway from 9 by 100 feet to 12 by 125 feet from 
Apalachee Bay, Fla., to Corpus Christi, Texas, and its 
extension to vicinity of Mexican border, except between 
Mobile Bay, Ala., and New Orleans, La., where width shall 
be 150 feet; and rental of Inner Harbor navigation canal 
facilities. 
Alternative connection with Mississippi River in vicinity 
of Algiers at New Orleans. 
Enlarge and extend Plaquemine-Morgan City route from 
Mississippi-Atchafalaya section of waterway, in vicinity of 
Morgan City, to and through a new terminal lock and entrance 
channel to Mississippi River in vicinity of Port Allen, 
opposite lower limit of port of Baton Rouge. 
Restore, improve, and maintain Franklin Canal as a terminal 
branch channel, 8 by 60 feet, from its confluence with Gulf 
Intracoastal Waterway to Franklin, La. 
A salt-water guard lock in waterway at mile 238 west of Harvey 
lock. 
Enlarge waterway to 16 by 150 feet from Mississippi River to 
Atchafalaya River, except in vicinity of Houma (mile 50.5 to 
63.5); of Houma bypass (mile 50.5 to 63.5) and of Algiers 
alternative canal; and enlarge waterway from Atchafalaya 
River to Sabine River to 16 by 200 feet. 
Replacement of Vermilion lock 
H. Doc. 582, 87th Cong., 2d 
2 sess. 
H. Doc. 435, 86th Cong., 2 2d sess. 
H. Doc. 238, 68th Cong., 1st sess. 
H. Doc. 238, 68th Cong., 1st sess. 
H. Doc. 341, 71st Cong., 2d sess. 
H. Doc. 96, 79th Cong., 1st 
sess.; H. Doc. 230, 76th Cong., 
1st sess. 
S. Doc. 188, 78th Cong., 2d sess. 
S. Doc. 242, 79th Cong., 2d sess. 
S. Doc. 189, 79th Cong., 2d sess. 
S. Doc. 231, 79th Cong., 2d sess. 
H. Doc. 556, 87th Cong., 2d sess. 
Approved by Secretary of the 
Army, May 16, 1967 
413 
451-584 0-72-27

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 11-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 23, 1962 
Oct. 27, 1965 
Aug. 18, 1941 
July 24, 1946 
Mar. 2, 1945 
Mar. 29, 1956 
Oct. 23, 1962 
414 
HOUMA NAVIGATION CANAL, LA. (See Section 15 of Text) 
Assumption of maintenance and operation of Houma navigation 
canal, constructed by Terrebonne Parish, to dimensions of 
15 by 150 feet. 
MERMENTAU RIVER, BAYOU NEZPIQUE, AND BAYOU DES CANNES, LA. 
(See Section 16 of Text) 
A 12- by 125-foot channel in Mermentau River from Gulf 
Intracoastal Waterway to Lake Arthur; a 12- by 200-foot 
channel through Lake Arthur; a 12- by 125-foot channel from 
upper end of Lake Arthur to junction of the Mermentau River 
and Bayous Nezpique and des Cannes; replacement of 
existing Lake Arthur highway bridge; and enlargement and 
realignment of Bayous Nezpique and des Cannes, to provide 
a 12- by 125-foot waterway from Interstate Highway 10 to 
Mermentau River. 
MERMENTAU RIVER, LA. (See Section 17 of Text) 
Channel enlargement, lower Mermentau River, from mile 15 
to Gulf of Mexico, and construct a lock and control 
spillway at Catfish Point, mile 24. 
Channel enlargement; lower Mermentau River below Grand 
Lake, mile 25; construct a gated-control structure at 
or near Grand Cheniere, mile 7; enlarge and realign Inland 
Waterway from Franklin, La., to Mermentau River, La., from 
Vermilion Bay to White Lake, via new channel, and from 
White Lake to Grand Lake; enlarge channel of North Prong 
of Schooner Bayou; construct a gated-control structure in 
new channel near Schooner Bayou lock; and include project 
'Waterway from White Lake to Pecan Island, La.' and portion 
of project 'Inland Waterway from Franklin, La., to Mermentau 
River' west of Vermilion Bay in modified project 'Mermentau 
River, La.' 
MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO, LA. 
(See Section 18 of Text) 
Combines projects of Mississippi River, Baton Rouge to New 
Orleans, Mississippi River, South Pass, and Southwest 
Pass, adding thereto project for Mississippi River from 
New Orleans to Head of Passes, to provide a single project, 
'Mississippi River, Baton Rouge to the Gulf of Mexico,' 
with channel dimensions as follows: Baton Rouge to New 
Orleans, 35 by 500 feet; port limits of New Orleans, 35 by 
1,500 feet; New Orleans to Head of Pa sses, 40 by 1,000 
feet; Southwest Pass, 40 by 800 feet; Southwest Pass Bar 
Channel, 40 by 600 feet; South Pass, 30 by 450 feet; South 
Pass Bar Channel, 30 by 600 feet. 
Construct a seaway canal 36 feet deep and 500 feet wide from 
Micheaud to 38-foot contour in gulf and an inner tidewater 
harbor consisting of a 1,000- by 2,000-foot turning basin 
36 feet deep and a connecting channel 36 feet deep and 
500 feet wide to Inner Harbor navigation canal and provides, 
when economically justified, for construction of a lock to 
Mississippi River at Meraux, La. 
Deepen existing channel from 35 to 40 feet by 500 feet wide 
from one-tenth mile below Louisiana Highway Commission 
bridge at Baton Rouge to upper limits of Port of New 
Orleans, and also 40 by 500 feet within presently 
authorized 35- by 1,500-foot channel in port limits of 
New Orleans. 
H. Doc. 583, 87th Cong., 2d sess.2 
H. Doc. 239, 89th Cong., 1st sess. 2 
S. Doc. 94, 77th Cong., 1st sess. 
S. Doc. 231, 79th Cong., 2d sess.2 
H. Doc. 215, 76th Cong., 1st sess. 2 
H. Doc. 245, 82d Cong., 1st sess. 6 
S. Doc. 36, 87th Cong., 1st sess.

TABLE 11-B (Continued) 
NEW ORLEANS, LA., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
MISSISSIPPI RIVER-GULF OUTLET, LA. (See Section 19 of Text) 
Mar. 29, 1956 
Aug. 13, 1968 
July 24, 1946 
May 17, 1950 
Aug. 30, 19358 
Aug. 26, 1937 
Mar. 2, 1945 
June 30, 1948 
July 14, 1960 
July 13, 1892 
July 24, 1946 
Aug. 13, 1968 
Mar. 3, 1899 
June 13, 1902 
Construct a seaway canal 36 feet deep and 500 feet wide from 
Micheaud to 38-foot contour in gulf and an inner tidewater 
harbor consisting of a 1,000- by 2,000-foot turning basin 
36 feet deep and a connecting channel 36 feet deep and 
500 feet wide to Inner Harbor navigation canal and provides, 
when economically justified, for construction of a lock to 
Mississippi River at Meraux, La. 
MISSISSIPPI RIVER-GULF OUTLET, MICHOUD CANAL, LA. 
(See Section 20 of Text) 
Construct a deep-draft navigation channel in the Gulf 
Intracoastal Waterway and Michoud Canal by enlargement to 
a depth of 36 by 250 feet from the Mississippi River-Gulf 
Outlet channel to and including a turning basin 800 feet 
square at the north end of Michoud Canal. 
OVERTON-RED RIVER WATERWAY, LA. (See Section 21 of Text) 
Construct 9- by 100-foot channel for 206 miles from 
Mississippi River, mile 301 AHP, through Old and Red Rivers 
to mile 31, thence by lateral canal through landcuts and 
existing waterways across Mississippi-Red River backwater 
area along south bank of Red River floodplain to 
Shreveport, and construct nine locks and pumping plant on 
Red River near Shreveport. 
Extend Overton-Red River Waterway 9- by 100-foot channel from 
Mississippi River to north bank of Black River, mile 35.5 
PETIT ANSE, TIGRE, AND CARLIN BAYOUS, LA. 
(See Section 22 of Text) 
A channel in Bayou Petit Anse 60 feet wide and 9 feet deep 
from Intracoastal Waterway to a point 3.2 miles upstream, 
thence 40 feet wide and 5 feet deep to highway bridge at 
head of Avery Island; and a channel in Bayou Carlin 40 feet 
wide and 5 feet deep from Bayou Petit Anse to Lake Peigneur. 
A channel in Bayou Petit Anse 9 feet deep and 80 feet wide 
from Intracoastal Waterway to north end of Avery Island and 
a channel 5 feet deep and 40 feet wide from Intracoastal 
Waterway to Vermilion Bay by way of McIlhenny Canal (Avery 
Canal). 
A channel in Bayou Carlin 9 feet deep and 80 feet wide from 
Bayou Petit Anse to Lake Peigneur. 
Protecting piers of railway bridge crossing Bayou Carlin at 
Delcambre, La. 
A harbor of refuge at Delcambre and a channel 7 feet deep and 
60 feet wide from Gulf Intracoastal Waterway via McIlhenny 
Canal (Avery Canal) to deep water in Vermilion Bay. 
RED RIVER BELOW FULTON, ARK. (See Section 23 of Text) 
Improve Red River from Fulton, Ark., to Atchafalaya River, La., 
455.6 miles, by systematic clearing of banks, snagging, 
dredging shoals, building levees, either alone or in 
cooperation with riparian States, closing outlets, revetting 
caving banks, and preventing injurious cutoffs. 
Construct Overton-Red River Waterway to Shreveport, La. 9 
Provides for a navigation channel 9 by 200 feet from the 
Mississippi River through Old River and Red River to 
Shreveport.1 0 
REMOVING WATER-HYCINTH (LOUISIANA) (See Section 24 of Text) 
Appropriations for Florida and Louisiana and extermination 
or removal of plants, building of boats, and establishment 
of booms 
Authorized use of mechanical, chemical, or other means 
whatsoever. 
415 
LHD. oc. 245, 82d Cong., 1st sess. 
S. Doc. 97, 90th Cong., 2d sess. 7 
H. Doc. 320, 80th Cong., 1st sess. 
S. Doc. 117, 81st Cong., 1st sess. 
H. Doc 225, 72d Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 40, 75th Cong., 1st sess. 
H. Doc. 594, 78th Cong., 2d sess. 2 
P.L. 858, 80th Cong., 2d sess. 
H. Doc. 70, 85th Cong., 2d sess. 
H. Doc. 378, 74th Cong., 2d sess. 
H. Doc. 320, 80th Cong., 1st sess. 2 
H. Doc. 304, 90th Cong., 2d sess. 
H. Doc. 91, 55th Cong., 3d sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 11-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 25, 1912 
July 24, 1946 
Oct. 27, 1965 
June 28, 1938 
June 22, 1936 
Oct. 27, 1965 
Aug. 3, 1955 
July 14, 1960 
416 
Made appropriation available for State of Mississippi and also 
made available for use in that state operating plant 
pertaining to work in Louisiana. 
WATERWAY FROM EMPIRE, LA., TO GULF OF MEXICO (See 
Section 25 of Text) 
Construction and maintenance of a waterway, 10 miles long, 
from State-owned canal and lock at Empire, La., to Gulf of 
Mexico, to provide a channel 9 by 80 feet, and for initial 
construction of rubblestone jetties inshore of 6-foot 
depth contour, with landward extensions thereof as 
required to prevent flanking, and for seaward extensions 
to 9-foot-depth contour if and when it becomes apparent 
that such extensions will be more economical than 
maintenance dredging of entrance channel. 
BAYOU BODCAU AND TRIBUTARIES, ARK. AND LA. (See 
Section 29 of Text) 
Extend Cypress Bayou-Red Chute Bayou levee, construct stream 
closure landside drainage channel and three culverts on Red 
Chute Bayou, and clearing and snagging channel; extend Flat 
River-Loggy Bayou levee, close Flat River near junction with 
Cutoff Bayou, and construct control structures on Flat River 
near junction with Red Chute Bayou; and enlarge Flat River 
channel to 20 by 35 feet, a distance of 11.6 miles. 
BAYOU BODCAUOIR, LA. (See Section 30 of Text) 
Provides for construction of a reservoir and other flood 
control works. 
BAYOU PIERRE, LA. (See Section 31 of Text) 
Widening channel at intervals totaling 12.9 miles, and 
snagging of 29.7 miles. 
CADDO LAKE, LA. (See Section 32 of Text) 
Replacement of existing dam with new dam having same flow 
characteristics and located as near as practicable 
downstream from the old dam, built under navigation project 
'Cypress Bayou and Waterway between Jefferson, Tex., and 
Shreveport, La.' 
COOPER LAKE AND CHANNELS, Tex. (See Section 33 of Text) 
Construction of earthfill dam and reservoir area; channel 
clearing, realignment, and enlargement; enlargement and 
extension of existing levees; construction of appurtenant 
drainage works along main stem of Sulphur River above mile 
126; channel clearing, realignment, and enlargement and 
levee enlargement and modification of appurtenant drainage 
works on Cuthand Creek below mile 24, on Sulphur River 
below mile 70, except in proposed Cooper Reservoir, miles 
29 to 42, and on Middle Sulphur River below mile 8; channel 
clearing and realignment of Brushy Creek below mile 5; and 
levee enlargement on North Sulphur River between miles 1 
and 5. 
GARLAND CITY, ARK. (See Section 34 of Text) 
Bank protection works consisting of a pile revetment on left 
bank of Red River above railway bridge or equivalent 
protective works, rock groins between the bridges, riprap 
around east bank railway pier, pile dikes on right bank of 
Red River above railway bridge, channel excavation on right 
bank in vicinity of railway bridge and a board revetment or 
equivalent work near anticipated natural cutoff to be 
constructed for protection of railway and highway bridges 
over Red River at Garland City, Ark. 
H. Doc. 697, 79th Cong., 2d sess. 2 
H. Doc. 203, 89th Cong., 1st sess. 
H. Doc. 378, 74th Cong., 2d sess. 
H. Doc. 378, 74th Cong., 2d sess. 2 
S. Doc. 39, 89th Cong., 1st sess. 2 
H. Doc. 488, 83d Cong., 2d sess. 2 
H. Doc. 167, 87th Cong., 1st sess.

TABLE 11-B (Continued) 
NEW ORLEANS, LA., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 27, 1965 
June 30, 1948 
July 24, 1946 
Oct. 27, 1965 
July 24, 1946 
Aug. 3, 1955 
July 14, 1960 
Oct. 23, 1962 
Oct. 27, 1965 
July 24, 1946 
GRAND ISLE AND VICINITY, LA. (HURRICANE PROTECTION) 
(See Section 35 of Text) 
A loop levee about 36 miles long along both banks of Bayou 
Lafourche from Golden Meadow to Larose; enlargement of 3 
miles of existing levee at Golden Meadow; floodgates for 
navigation and hurricane protection in Bayou Lafourche at 
upper and lower bayou crossings; about 8 miles of low 
interior levees to regulate intercepted drainage; and 
seven multibarreled culverts controlled by flap gate. 
HARVEY CANAL, BAYOU BARATARIA LEVEE, LA. (See Section 36 
of Text) 
Provides for construction of new levees and enlargement of 
existing non-Federal levees along Harvey Canal and Bayou 
Barataria from mile 1.8 on Harvey Canal to Louisiana 
Highway No. 45 near Crown Point. 
LAKE O' THE PINES, TEX. (See Section 37 of Text) 
Provides for construction of an earthfill dam and reservoir 
area. 
LAKE PONTCHARTRAIN AND VICINITY, LA. (HURRICANE 
PROTECTION) (See Section 38 of Text) 
Control of hurricane tides by construction of two independent 
units, the Lake Pontchartrain Barrier plan and the Chalmette 
Area plan. 
LAKE TEXARKANA, TEX. (See Section 39 of Text) 
Construction of an earthfill dam and a reservoir. 
MANIECE BAYOU, ARK. (See Section 40 of Text) 
Diversion of Maniece Bayou to enter Red River at mile 362.3; 
snagging and clearing channel between Red River and mile 
0.47; and channel enlargement and realinement between mile 
0.47 and 8. 
Enlarge and realine Maniece and Field Bayous below mile 23.1, 
including further channel enlargement of Maniece Bayou below 
mile 8 beyond that already authorized; a low water dam near 
end of existing left-bank Red River levee, levee extension 
by a spoil bank for 3.5 miles to mouth of Maniece Bayou; 
and an appurtenant interceptor drainage ditch. 
MISSISSIPPI RIVER DELTA AT AND BELOW NEW ORLEANS, LA. (NEW 
ORLEANS TO VENICE, LA., HURRICANE PROTECTION) (See Section 
41 of Text) 
Improvements along Mississippi River below New Orleans, La., 
for prevention of hurricane tidal flood damages by increasing 
heights of existing back levees and modifying existing 
drainage facilities where necessary in three separate 
reaches. 
MORGAN CITY AND VICINITY, LA. (HURRICANE PROTECTION) 
(See Section 42 of Text) 
Construction of new levees along Lake Palourde and Bayou Ramos, 
levee to tie-in with Bayou Boeuf lock levee and three gravity 
drainage structures in Morgan City unit and enlargement of 
bank levee, construction of new levee, and construction of 
one floodgate and five gravity drainage structures in 
Franklin and vicinity unit. 
RED RIVER BELOW DENISON DAM, LEVEES AND BANK 
STABILIZATION (NEW ORLEANS DISTRICT) 
(See Section 44 of Text) 
Levee and bank stabilization 
417 
H. Doc. 184, 89th Cong., 1st sess. 2 
Approved by Chief of Engineers 
on Jan. 22, 1964, under 
authority of Section 205. 
H. Doc. 602, 79th Cong., 2d sess.2 
H. Doc. 231, 89th Cong., 1st sess. 
H. Doc. 602, 79th Cong., 2d sess. 
H. Doc. 488, 83d Cong., 2d sess. 
H. Doc. 288, 86th Cong., 2d sess. 
H. Doc. 550, 87th Cong., 2d sess. 
H. Doc. 167, 89th Cong., 1st sess. 
H. Doc. 602, 79th Cong., 2d sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 11-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 13, 1968 Deauthorization of Mooringsport Dam and Reservoir on Cypress H. Doc. 304, 90th Cong., 2d sess. 
Creek; realining and stabilizing the banks of the Red River; 
and recreational facilities from the Mississippi River to 
Denison Dam, Okla., and Tex. 
WALLACE LAKE, LA. (See Section 45 of Text) 
June 22, 1936 Construction of an earthfill dam and a reservoir. H. Doc. 378, 74th Cong., 2d sess. 
1. Improvement reported separately as Atchafalaya River, 8. Included in Public Works Administration program Sept. 
Bayous Chene, Boeuf, and Black, La. 6, 1933. 
2. Contains latest published map. 9. Chief of Engineers authorized treatment of Overton-Red 
3. Permanent Appropriation Repeal Act. River Waterway as separate project. 
4. For latest published map, see H. Doc. 288, 66th Cong., 10. Improvement reported separately as Red River Waterway, 
1st sess. La., Tex., Ark., and Okla. 
5. Not mentioned in authorizing act. 11. Modification reported separately under project Red River 
6. Improvement reported as Mississippi River-Gulf Outlet. Waterway, La., Tex., Ark., and Okla. 
7. Improvement reported separately as Mississippi River- 
Gulf Outlet, Michoud Canal, La. 
BAYOU TECHE, LA., LOCKS 
TABLE 11-C (See Section 10 of Text) 
Lock Pertinent Data 
Keystone Lock Miles from New Iberia, La. 18 
Miles from Intracoastal Waterway 82.5 
Width of chamber 36 feet 
Length available for full width 160 feet 
Lift 8 feet 
Depth on miter sill at mean low gulf level 8 feet 
Character of foundation Timber piles 
Kind of dam Timber, rockfill 
Type of construction Concrete 
Year completed 1913 
Cost $257,720 
Berwick Lock Miles north of Berwick, La. 1.7 
Miles below mouth of Bayou Teche 9 
Width of chamber 45 feet 
Length available for full width 300 feet 
Lift 0-14.5 feet 
Depth on miter sill at mean low gulf level 9 
Character of foundation Timber piles 
Type of construction Reinforced concrete 
Open to navigation November 1950 
Completed September 1951 
Cost (flood control, MR&T funds) $2,100,000 
418

NEW ORLEANS, LA., DISTRICT 
TABLE 11-D. 
CALCASIEU RIVER AND PASS, LA. 
WORK ACCOMPLISHED UNDER EACH MODIFICATION 
(See Section 11 of Text) 
Modification Started Completed 
Aug. 26, 1937 Fiscal Year 1939 April 1941 
Mar. 2, 1945 September 1948 June 1949 
July 24, 1946 September 1948 April 1953 
July 14, 1960 April 1962 October 1968 
TABLE 1 1-G RESERVOIR OPERATIONS 
See 
Section Storage Inflow Outflow 
in Text Project (acre-feet) (c.f.s.) (c.f.s.) 
30. Bayou Bodcau July 1, 1969 225 8 10 
Reservoir, La. June 30, 1970 499 42 68 
May 9, 1970 (maximum) 42,948 - 
May 5, 1970 (maximum) - 4,862 - 
May 9, 1970 (maximum) - - 1,874 
37. Lake O'the Pines, Tex. July 1, 1969 278,636 - 25 
June 30, 1970 282,710 - 25 
May 2, 1970 (maximum) 293,356 - - 
April 29, 1970 (maximum) - 7,247 - 
April 30, 1970 (maximum) - - 3,020 
39. Lake Texarkana, Tex. July 1, 1969 332,712 - 80 
June 30, 1970 285,880 228 77 
May 6, 1970 (maximum) 510,546 - - 
May 2, 1970 (maximum) - 32,212 - 
March 7, 1970 (maximum) - - 10,635 
45. Wallace Lake, Texas July 1, 1969 7,235 - - 
June 30, 1970 8,010 30 30 
March 6, 1970 (maximum) 20,535 - - 
February 27, 1970 (maximum) - 2,799 - 
March 7, 1970 (maximum) - - 1,283 
419

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
GULF INTRACOASTAL WATERWAY BETWEEN APALACHEC BAY, FLA., 
AND MEXICAN BORDER (NEW ORLEANS DIST.) - LOCKS 
(See Section 14 of Text) 
Pertinent Data 
Algiers Lock 
Miles below New Orleans, La. (Canal St.) 
Miles from Mississippi River 
Width of chamber 
Length available for full width 
Lift 
Depth on sill at mean low gulf level 
Character of foundation 
Type of construction 
Opened to navigation 
Cost 
Miles from New Orleans, La. (Canal St): 
Via Harvey Lock 
Miles from Mississippi River via Plaquemine lock 
Width between abutments 
Length available for full width 
Lift 
Depth on sill at mean low gulf level 
Character of foundation 
Type of construction 
Opened to navigation 
Cost (Flood control, MR&T funds) 
Miles from New Orleans, La. (Canal St): 
Via Harvey Lock 
Miles from Mississippi River via Plaquemine lock 
Width of chamber 
Length available for full width 
Lift 
Depth on sill at mean low gulf level 
Character of foundation 
Type of construction 
Opened to navigation 
Completed 
Cost (Flood control, MR&T funds) 
Miles below Lake Charles, La. 
Miles from Calcasieu River 
Width between abutments 
Length available for full width 
Lift 
Depth on sill at mean low gulf level 
Character of foundation 
Type of construction 
Opened to navigation 
Cost 
Miles above New Orleans, La. (Canal St.) 
Miles from Mississippi River 
Width of chamber 
Length available for full width 
Lift 
Depth on miter sill at mean low gulf level 
Character of foundation 
Type of construction 
Opened to navigation 
Cost 
0.38 
75 feet 
800 feet 
0-18 feet 
13 feet 
Timber piles 
Reinforced concrete 
April 1956 
$5,215,700 
Bayou Boeuf Lock 
96.6 
56.7 
75 feet 
1,156 feet 
0-11.3 feet 
13 feet 
Concrete slab on medium to stiff clay 
Reinforced concrete gatebays and earth chamber 
September 1954 
$2,754,000 
Bayou Sorrel Lock 
135 
18 
56 feet 
797 feet 
0-21 feet 
14 feet 
Timber piles 
Reinforced concrete gatebays and earth chamber 
June 1951 
October 1952 
$4,700,948 
Calcasieu Lock
16.6 
0.5 
75 feet 
1,206 feet 
0-4 feet 
13 feet 
Concrete slab on preconsolidated stiff clay 
Reinforced concrete gatebays and earth chamber 
December 1950 
$2,133,527 
Harvey Lock 
3.3 
0.13 
75 feet 
425 feet 
0-19.6 feet 
12 feet 
Timber piles 
Reinforced concrete 
1934 and completed 1935 
$1,775,132 
420 
TABLE 11-E.

NEW ORLEANS, LA., DISTRICT 
OTHER AUTHORIZED NAVIGATION PRO. 
For Last 
Full Report 
See Annual 
Report for 
Cost to June 30, 1970 
Operation & 
Construction Maintenance 
Amite River and Bayou Manchac, La. 1,2,3 
Bayou Bonfouca, La.1,3 
Bayou Dorcheat, Loggy Bayou, and Lake 
Bisteneau, La.3 ,4,5' 
Bayou Dupre, La.1 ' 3 
Bayou Grosse Tete, La.1 ' 8 
Bayou Lacombe, La.1'3 
Bayou Plaquemine Brule, La.3 
Bayou Terrebonne, La.2 '3 ' 9 
Bayou Vermilion, La. 2 ' 3 
Big Pigeon and Little Pigeon Bayous, La.3,4,6 
Cane River, La. 3 ,4,6 
Chefuncte River and Bogue Falia, La.1'3 
Cypress Bayou and Waterway between Jefferson, 
Tex., and Shreveport, La.3 
Grand Bayou Pass, La.3 
Inland Waterway from Franklin to Mermentau 
River, La.3 
Intracoastal Waterway from the Mississippi 
River to Bayou Teche, La.10 
Lake Charles Deep Water Channel, La.1 
Little Caillou Bayou, La.3 
Mississippi River Outlets, vicinity of 
Venice, La.13 
Navigation work under special authorization 
(Calcasieu Pass channel in Old River Bend 
at Cameron, La.)14 
Pass Manchac, La.3 
Red River Waterway, La., Ark., Okla., 
and Tex. 1 3 
Sulphur River, Ark., and Tex. 3 ',4 
Tangipahoa River, La. 1 5 
Tickfaw, Natalbany, Ponchatoula, and Blood 
Rivers, La. 1 ,3 
Vinton Waterway, La. 7 
Waterway from Intracoastal Waterway to Bayou 
Dulac, La., (Bayous Grand Caillou and 
LeCarpe, La.)"1 3 
Waterway from White Lake to Pecan Island, La.19 
1. Channel adequate for commerce. 
2. Includes previous project costs. 
3. Completed. 
4. Inactive. 
5. No commerce reported. 
6. Abandonment recommended in H. Doc. 1692, 64th 
Cong., 2d sess., and H. Doc. 467, 69th Cong., 1st sess. 
7. Includes $56 cost incurred in 1969. 
8. Completed except that portion above mile 10.3 providing 
for widening from 40 feet to 60 feet, which is inactive. 
9. By P.L. 88-404, that portion of Bayou Terrebonne 
between point where Barrow Street crosses said stream and a line 
determined by prolonging and extending eastern right-of-way 
line of New Orleans Boulevard southerly to south bank of said 
stream was declared non-navigable. 
10. Not completed; superseded for most of its length by 
present 12- by 125-foot Gulf Intracoastal Waterway, which 
coincides with or parallels it. 
11. Maintenance project; no future work scheduled. 
12. Includes $25 cost incurred in 1968 and $713 in 1969. 
13. Construction has not been initiated. 
14. Work is under continuing authority. 
15. The existing project was completed in 1884; construction 
modification has not been initiated. 
16. Includes $32 cost incurred in 1970. 
17. No Work performed; local interests have not provided 
rights-of-way and dumping privileges. 
18. Includes $42 cost incurred in 1969. 
19. Not completed; incorporated in navigation project 
'Mermentau River, La.' 
421 
TABLE 11-F
Name of Project 
1950 
1967 
1887 
1968 
1969 
1967 
1950 
1961 
1947 
1936 
1910 
1967 
1969 
1950 
1960 
1956 
1950 
1952 
1969 
1957 
1953 
1969 
1919 
1969 
1967 
1950 
1968 
1948 
$28,234 
30,997 
5,000 
38,915 
29,392 
4,716 
33,410 
120,089 
34,900 
2,500 
58,342 
208,817 
7,676 
249,052 
77,761 
1,374 
45,989 
26,70316 
8,115 
129,622 
10,904 
$63,534 
231,065 
104,1877 
123,454 
68,482 
36,780 
251,691 
200,169 
37,669 
2,000 
152,032 
440,568 
14,480 
552,780 
11,669 
241,896 
241,18612 
139,755 
10,039 
105,521 
88,810 
52,314 
10,742

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 11-H 
RED RIVER BELOW DENISON DAM 
(NEW ORLEANS DISTRICT): NEW PROJECTS 
(See Section 43 of Text) 
Drainage Conserva- Flood Estimated 
Project Stream re tion Control Federal 
(square Storage (acre- Cost 
miles) (acre-feet) feet) 
Bayou Bodcau and tributaries, - 1,158 - - $ 2,620,0002 
Ark. 1 3 
Bayou Nicholas-Coushatta, La. - - - - 70,7174 
Bayou Pierre in vicinity of - - - 243,3362 
Shreveport, La.5 
Caddo Lake, La.1 Caddo Lake - - - 3,270,0002 
Campti-Clarence Area in Natchi- Red River - - - 1,572,9572 
toches Parish, La. 
Cooper Lake and Channels, Tex.1 South Sulphur 476 37,0006 131,400 39,100,0002 
River 
East Point, La. - - - - 486,0692 
Garland City, Ark. - - - 1,340,0002 
Lake O' the Pines, Tex.1 Cypress Cr. 850 3,800 587,2005 14,753,0002,7 
Lake Texarkana, Tex.1 Sulphur R. 3,400 145,300 2,509,000 42,600,0008 
Maniece Bayou, Ark. 1 - - - 970,9322 
McKinney Bayou, Ark.9 - - - 1,456,7002 
Posten Bayou, Ark., and La.3 ' - - - - 560,000 
Red River below Denison Dam - - - - 25,100,0002 
levees and bank stabilization, 
Tex., Ark., and La. (New Orleans 
District) 
Total $134,143,711 
1. Details presented in individual report herein. 
2. In addition, non-Federal funds are: 
Bayou Bodcau and tributaries, Ark. and La .............................................. $ 1,020,000 
Bayou Pierre in vicinity of Shreveport, La. (cash contribution) ............... .......... ........ .. 89,047 
Caddo Lake, La. ............... ... ................ ................... .... .. 218,000 
Campti-Clarence Area in Natchitoches Parish, La .................. ..................... 480,000 
Cooper Lake and channels, Tex. (excludes $16,162,700 for reimbursement for water supply; includes 
cash contribution of $1,700,000. .............................. .. ............... 2,029,000 
East Point ............................ .............. ................. 67,000 
Garland City, Ark.. ............... . .... ................... .................... . 6,000 
Lake 0' the Pines, Tex. (cash contribution).................................. ......... 1,978,000 
Maniece Bayou, Ark. (cash contribution) ................................. ..... ................ 39,293 
McKinney Bayou, Ark. (cash contribution) ........................................... 18,700 
Red River below Denison Dam, levee and bank stabilization, Tex., Ark., and La. (includes $100,000 
cash contribution). ....................................................... 300,000 
3. Construction on this project not started. 
4. For last full report, see Annual Report for 1964. 
5. For last full report, see Annual Report for 1951. 
6. Joint-use pool (sediment). 
7. Includes $2,234,200, Code 710, and $399,739 accelerated public works funds. 
8. Includes $2,165,000, Code 710, and $399,939 accelerated public works funds, and $8,011,404 to be reimbursed by local interests over 
a period not to exceed 50 years for water supply storage and prorata share of original reservoir cost. 
9. Inactive. 
422

NEW ORLEANS, LA., DISTRICT 
TABLE 11-I 
RED RIVER BELOW DENISON DAM 
(NEW ORLEANS DISTRICT): INCORPORATED PROJECTS 
(See Section 43 of Text) 
For Last 
Flood Estimated Full Report 
Project Type of Work Control Federal See Annual 
See Annual 
Report for 
Aloha-Rigolette Area, Grant and Levee and appurtenances 1941 $ 1,653,2371 1956 
Rapides Parishes, La. 
Bayou Bodcau Reservoir, La. Flood-control reservoir 1938 5,018,7401' 2 3 
Bayou Bodcau, Red Chute and Loggy Channel improvement 1941 319,2001 1948 
Bayou, La. 
Bayou Pierre, La. Channel enlargement 1936 299,5291 3 
Black Bayou Lake, La.4 ' 5 Flood-control reservoir 1936 714,000 1945 
Colfax, Grant Parish, La. Cutoff 1938 70,3481,6 1938 
Grant Parish, below Colfax, La. Levees 1938 38,8091 1941 
Hempstead County levee district Levee enlargement 1938 88,0061 1941 
No. 1, Ark. 
Natchitoches Parish, La. Levee and appurtenances 1936 1,529,9271, 7 1956 
Pineville, Red River, La. Levee and appurtenances 1941 232,4261 1953 
Red River in vicinity of Shreveport, La. Bank protection 1944 3,908,0001 1953 
Red River Parish, La. Levee enlargement 1936 149,4351 1939 
Saline Point, La. Cutoff 1936 124,1111 1945 
Wallace Lake, La. Flood-control reservoir 1936 1,219,3711, 2 3 
Total $15,365,139 
1. Actual cost. 
2. Includes amounts indicated for recreational facilities under 
Code 710; Bayou Bodcau Reservoir, La., $920,000; Wallace Lake, 
La., $17,164. 
3. Included in this report. 
4. Work not started. 
5. Inactive. 
6. Completed under provisions of section 7 of Flood Control Act of 
1928, as amended by section 9 of Flood Control Act of 1936, and included 
in 1939 Annual Report of President, Mississippi River Commission, 
p. 2214. 
7. In addition, $250,000 was expended from contributed funds. 
423

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Name of Project 
Aloh. -Rigolette Area, Grant and Rapides 
Parishes, La.1 '2 
Amite River and Tributaries, La.2 
Bayou Bodcau, Red Chute, and Loggy Bayou, La. 1,2 
Bayou Choupique, La. 2' 6 
Bayou Nicholas, Coushatta, La.2 ' 6 
Bayou Pierre in vicinity of Shreveport, La. 1 '2 
Bayou Rapides, La.2 '6 
Black Bayou Reservoir, La.1,4,'
5 
Black Bayou-Pine Island Area, La.2 ' 6 
Campti-Clarence Area in Natchitoches 
Parish, La.2 
Choctaw Bayou and Tributaries, La.4 ' 6 
Colfax, Grant Parish, La. 1' 8 
East Point, La.2 
Grant Parish below Colfax, La. 1 2 
Hempstead County Levee District No. 1, Ark. '2 
McKinney Bayou, Ark. 1 , 5 
Natchitoches Parish, La.1 ' 2 
Pineville, Red River, La. 1,2 
Posten Bayou, Ark., and La. 1 ,5 
Red River Parish, La. 1 , 2 
Red River in vicinity of Shreveport, La. 1 ' 2 
Saline Point, La. 1 ,2 
Twelvemile Bayou, La.2 ' 6 
For Last 
Full Report 
See Annual 
Report For 
1956 
1964 
1948 
1954 
1964 
1951 
1952 
1945 
1963 
1969 
1968 
1938 
1969 
1941 
1941 
1964 
1956 
1953 
1939 
1953 
1945 
1966 
Cost to June 30, 1970
Operation & 
Construction Maintenance 
$1,653,189 
3,034,2553 
319,200 
129,930 
70,717 
243,3363 
95,179 
336,063 
1,572,957 
72,0577 
70,348 
486,069 
38,809 
88,006 
1,021,2633 
1,529,4783 
232,426 
149,435 
3,908,000 
124,111 
335,433 
1. Authorized under project 'Red River Below Denison 
Dam.' 
2. Completed. 
3. In addition, the following was expended from 
contributed funds: 
Amite River and Tributaries ............... $ 430 
Bayou Pierre in vicinity of Shreveport, La. .... 89,047 
McKinney Bayou, Ark. ................... 18,700 
Natchitoches Parish, La. .................. 250,000 
4. Construction not initiated. 
5. Inactive. 
6. Authorized by Chief of Engineers 
7. $125 expended in 1969 for engineering and design, and 
$103 in 1970. 
8. Completed under provisions of Sec. 7, Flood Control Act 
1928, as amended by Sec. 9, Flood Control Act 1936, and 
included in 1939 Annual Report of President, Mississippi River 
Commission, p. 2214. 
424 
TABLE 11-J

NEW ORLEANS, LA., DISTRICT 
TABLE 11-K. 
EMERGENCY FLOOD CONTROL ACTIVITIES - 
REPAIR, FLOOD FIGHTING, AND RESCUE WORK 
(P. L. 99, 84TH CONG., AND ANTECEDENT LEGISLATION) 
(See Section 48 of Text) 
Project and Location 
Advance preparation for flood emergency (New Orleans District) 
Rehabilitation: 
A. P. Cox Farm levee 
Armistead Levee 
Campti-Clarence area, Item R-178.0-L 
Cedar Bluff 
Emergency Setback, Red River below Denison 
Grand Prairie Levee District 
Hurricane Camille 
Kelly Lake levee, setback 
Lower Howard levee 
McKinney Bayou Drainage District 
Red Lake levee 
Red River levees 
State Line levee, setback 
Sulphur River levee 
Thompson Place and Briarfield levees 
Urania levee 
Total 
Federal 
Cost 
$ 27,592 
6,544 
20,591 
26,464 
31,183 
1,610 
20,202 
936,205 
75 
1,992 
43,977 
34,013 
5,271 
6,225 
24,810 
14,490 
76,052 
$1,249,705 
TABLE 1 1-L COSTS FOR FLOOD PLAIN MANAGEMENT SERVICES 
(See Section 50 of Text) 
Fiscal Year 
Studies and Services Costs 
Flood Plain Information Reports 
Baton Rouge, La. $ 13,804 
Gonzales, La. 17,294 
Shreveport, La. 26,490 
Sulphur Springs, Tex. 9,881 
Texarkana, Ark.-Tex. 28,498 
Comprehensive FD Prev. Plan 4,065 
Technical Services 14,449 
FPMS Unit 55,061 
Total $169,541 
425 
,

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 11-M FLOOD PLAIN INFORMATION REPORTS 
COMPLETED TO DATE 
(See Section 50 of Text) 
Requesting Date Federal 
Location Agency Completed Cost 
Oakdale, La. State of Louisiana Sept. 1968 $25,803 
Department of 
Public Works 
Sulphur Springs, Texas Texas Water Feb. 1970 30,124 
Development Board 
TABLE 11-N SPECIAL FLOOD HAZARD INFORMATION REPORTS 
COMPLETED TO DATE 
(See Section 50 of Text) 
Requesting Date 
Location Agency Completed 
Brush Bayou Federal Housing July 1968 
Shreveport La. Administration 
426

VICKSBURG, MISS., DISTRICT * 
The district comprises western Mississippi, southern 
Arkansas, northeastern Louisiana, and a very small 
portion of southwestern Tennessee, embraced in 
drainage basins of eastern tributaries of Mississippi 
River south of Horn Lake Creek to and including 
Buffalo River; western tributaries between White and 
Red Rivers, including Arkansas River Basin below a 
point 3 miles upstream from Pine Bluff and Arkansas 
River below mile 40 near Pendleton, Ark.; and 
Ouachita and Black Rivers in Arkansas and Louisiana. 
IMPROVEMENTS 
Navigation Page 
1. Lake Providence Harbor, La ................ 427 
2. Ouachita and Black Rivers below 
Camden, Ark ................................... 427 
3. Yazoo River, Miss. ................................... 428 
4. Other authorized navigation projects .... 429 
4A. Navigation work under special 
authorization .......................................... 429 
Flood Control 
5. Ouachita River and tributaries, Ark. 
and La ................................................... 429 
5A. Lake Ouachita, Ouachita River, Ark. 429 
5B. DeGray Lake, Caddo River, Ark. ....... 429 
Flood Control (cont.) Page 
5C. Lake .Greeson, Little Missouri River, 
A rk. ...................................................... 430 
5D. Bayou Bartholomew and tributaries, 
Ark. and La. .................................... 430 
5E. Monroe Floodwall, La. ......................... 430 
6. Inspection of completed flood control 
projects ........................................ 431 
7. Other authorized flood control projects 431 
8. Flood control work under special 
authorization .................................... 431 
General Investigations 
9. 
10. 
11. 
Surveys ........................................ 431 
Collection and study of basic data ....... 431 
Research and development .................. 4 31 
NAVIGATION 
1. LAKE PROVIDENCE HARBOR, LA. 
Location. Hagaman Chute, a secondary channel of 
the Mississippi River at mile 484 above Head of Passes, 
and about 3 miles south of Lake Providence, La. 
Existing project. A dredged harbor channel about 0.7 
mile long and 150 feet wide with a project depth of 9 
feet in Hagaman Chute from the Mississippi River. 
Channel was widened to 400 feet in front of and 
upstream from port area a distance of 800 feet to 
provide a turning basin. Local interests constructed 
retaining dikes to provide the disposal area for material 
excavated from channel and turning basin. Resulting 
hydraulic fill provides a raised port area. Federal cost 
of completed work was $198,859; excluding preauthorization 
study costs. Total non-Federal cost was 
$233,400, including cost of retaining dikes, and a cash 
contribution of $35,000. 
Local cooperation. Fully complied with. 
Terminal facilities. Local interests provided port 
facilities. 
Operations and results during fiscal year. Leased dredge 
moved 462,578 cubic yards of material for maintenance 
in harbor channel and turning basin. 
Condition at end of fiscal year. The project was 
completed in 1963 and is being maintained. 
2. OUACHITA AND BLACK RIVERS 
BELOW CAMDEN, ARK. 
Location. Ouachita River rises in Polk County, Ark., 
and flows southeasterly and southerly about 600 miles. 
Below its confluence with Tensas and Little Rivers at 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
427

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Jonesville, La., it is called Black River, which enters 
Red River 35.5 miles from the Mississippi River. 
Previous projects. See page 683 of Annual Report for 
1962 for details. 
Existing project. See page 684 of Annual Report for 
1962 for details of existing 6.5 foot navigation project. 
New work for completed project cost $4,574,551, 
exclusive of amounts expended under previous projects. 
Modified project and project for Red River below 
Fulton, Ark., provide for a channel 9 feet deep and 100 
feet wide in Red River between Old River and mouth 
of Black River, and in Black and Ouachita Rivers from 
mouth of Black River to Camden, Ark. This will be 
accomplished by construction of four new locks, 84 by 
600 feet, and new dams (at mile 25 and Columbia, La., 
to replace existing locks and dams 2, 3, 4, and 5 
designated as Jonesville and Columbia locks and dams, 
respectively, and at locks and dams 6 and 8 redesignated 
Felsenthal and Calion locks and dams, 
respectively); channel realignment; and mitigation 
measures to preserve Catahoula Lake for migratory 
waterfowl. Approved (1970) estimated cost for new 
work for 9-foot navigation project is $111,950,000, 
including $107,000,000 Federal and $4,950,000 non- 
Federal for lands, damages, and relocations. 
Local cooperation. All local obligations to date have 
been met in Louisiana. Necessary rights-of-way have 
not been obtained in Arkansas. 
Terminal facilities. Public loading docks at Columbia, 
La., and Camden, Ark. Privately-owned docks and 
loading and unloading facilities at Columbia, Monroe, 
and Sterlington, La., and El Dorado, Calion, and 
Camden, Ark. Two grain handling facilities in the 
vicinity of Jonesville, La., and one in the vicinity of 
Acme, La., are in use. 
Operations and results during fiscal year. Construction of 
Columbia lock was completed during the fiscal year. 
Construction of Jonesville lock and dam is underway. 
Planning and design for other features in the Jonesville 
and Columbia pools are continuing. Design activities 
for Felsenthal and Calion locks and dams and related 
features have been curtailed pending solution of rightof-
way problems in Arkansas. One leased cutterhead 
dredge maintained existing 6.5 foot project depth, 
removing 468,289 cubic yards of material. Snagging 
and clearing was accomplished where required and the 
six locks and dams were maintained and operated 
throughout the fiscal year. 
Condition at end of fiscal year. The 6.5 foot project is 
complete and being maintained. Planning and design 
for 9-foot navigation project started in fiscal year 1962 
and is continuing except as noted above. Construction 
at Columbia lock and dam started in February 1964. 
The dam was completed in November 1968 and the 
lock was completed in 1969. Construction atJonesville 
lock and dam started in May 1967. The lock and dam 
are approximately 85 percent complete. (See table 12- 
C on lock and dams, Ouachita and Black Rivers, Ark. 
and La.) 
3. YAZOO RIVER, MISS. 
Location. Formed by junction of Tallahatchie and 
Yalobusha Rivers in Leflore County, Miss., flows about 
169 miles southerly and southwesterly, and enters 
Mississippi River at Vicksburg, Miss. (See 1969 
Mississippi River Commission maps, alluvial valley of 
Mississippi River.) 
Previous projects. See page 681 of Annual Report for 
1961, and page 452 of Annual Report for 1968 for 
details. 
Existing project. The Yazoo River Navigation project 
consists of a 9-foot channel from its mouth to 
Greenwood, Mississippi, mile 164.9 (present mileage), 
with a minimum width of 150 feet. The project includes 
a single lock (84' x 600') (and dam) located near 
Vicksburg, dredging and channel realignment, and 
600,000 acre-feet of additional storage in Sardis Lake 
to augment low flows in the Yazoo River, and 
recreation features. Estimated (1970) Federal cost of 9- 
foot project is $73,200,000. 
Local cooperation. None required on previous project. 
The authorization of the 9-foot navigation project 
requires local interests to: 
a. Provide all lands, easements, rights-of-way and 
flowage rights in overflow areas required for construction 
and subsequent maintenance of the project, 
except at Sardis Lake; 
b. Provide land for aids to navigation upon the 
request of the Chief of Engineers; 
c. Provide suitable areas determined by the Chief of 
Engineers to be required in the general public interest 
for initial and subsequent disposal of spoil, necessary 
retaining dikes, bulkheads, and embankments therefor, 
or the cost of such retaining works; 
d. Hold and save the United States free from 
damages due to the construction works and subsequent 
operation and maintenance, including but not limited 
to those resulting from dredging, change in groundwater 
level, and wave action; 
e. Provide and maintain, without cost to the United 
States, adequate public terminal and transfer facilities, 
including berths and access channels, open to all on 
equal terms; 
f. Accomplish alterations and relocations as required, 
except for those required for increasing 
capacity of Sardis Lake, including a portion of the cost 
of alteration of the State highway bridge at Belzoni, to 
be determined subsequent to authorization in accordance 
with the principles of section 6 of the Bridge 
Alteration Act of 21 June 1940, as amended; and 
g. Contribute or repay to the United States an 
amount equal to one-half the separable cost of 
recreation features and assume responsibility for 
operation and maintenance of these facilities to be 
provided as a part of this project. 
428

VICKSBURG, MISS., DISTRICT 
Terminal facilities. At Greenwood there is a privatelyowned 
dock and a grain loading facility. There are 
privately owned facilities for loading grain at Belzoni 
and Satartia. At Yazoo City there is a privately-owned 
grain loading facility and a public and a private dock 
to handle dry and liquid fertilizer. At Mississippi 
Valley Portland Cement Co. plant near Redwood, 
Miss., there is a privately-owned dock to unload stone 
and shell. 
Operations and results during fiscal year. Maintenance 
clearing and snagging were done as required on the old 
authorized project. 
Condition at end of fiscal year. Entire river is navigable 
(no work has been done on new authorization). 
Controlling depths usually vary between 12 feet during 
first 6 months of the year and 4 feet during remainder 
of year. 
4. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See appropriate table at end of chapter) 
4A. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION. 
Navigation activities pursuant to section 107, Public Law 87- 
645 as amended (preauthorization). 
Initiated preliminary investigations for Rosedale 
Harbor, Miss., (Miss. R.) and Belzoni Port, Miss. 
(Yazoo River). 
FLOOD CONTROL 
5. OUACHITA RIVER AND 
TRIBUTARIES, ARK., AND LA. 
Location. Improvements comprising comprehensive 
project are on main stem Ouachita River, Ark., and 
La., on its tributaries, Caddo River and Little Missouri 
River, and in Pine Bluff, Ark. Description of Ouachita 
River Basin is presented in greater detail on page 690 
of Annual Report for 1962. 
Existing project. The authorized general plan for flood 
control and other purposes in the Ouachita River basin 
includes the projects listed in table 12-E at the end of 
this chapter. The 1966 Flood Control Act modified the 
Bayou Bartholomew and Tributaries, Ark. and La., 
project to include ten water retention lakes in the 
western tributaries of Bayou Bartholomew in Arkansas 
and six local levee units along the main stem of the 
bayou in Louisiana. 
Local cooperation. Fully complied with for completed 
features of comprehensive project. (See individual 
statements for further details.) 
Operations and results during fiscal year. Operations for 
Lake Ouachita, DeGray Lake, Lake Greeson, Bayou 
Bartholomew and Tributaries, and Monroe Floodwall 
are shown in individual reports herein. 
Condition at end of fiscal year. Pertinent data on those 
features which are complete or not started are in Table 
12-E at end of chapter. Condition of Lake Ouachita, 
DeGray Lake, and Lake Greeson is given in the 
following individual reports: 
5A. LAKE OUACHITA, OUACHITA RIVER, 
ARK. 
Location. This project is located on Ouachita River, 
Ark., at head of Lake Hamilton (pool of Carpenter 
Dam), 486 miles above mouth of Black River, and 
approximately 10 miles northwest of Hot Springs, Ark. 
Previous project. See page 693 of Annual Report for 
1962 for details. 
Existing project. A lake of 2,768,000 acre-foot storage 
capacity for flood control and other purposes with an 
installed power capacity of 75,000 kilowatts. Remaining 
work consists of completion of public-use 
facilities. Latest approved (1970) estimated project cost 
is $34,580,000. 
Local cooperation. None required. 
Operations and results during fiscal year. Power production 
totaled 188,531,000 kilowatt-hours, of which 
186,975,000 kilowatt-hours were delivered to Arkansas 
Power and Light Company, under contract between 
that company and Southwestern Power Administration. 
Pool elevation of 579.2 feet above mean 
sea level, or 1.2 feet above maximum power pool, on 
April 27, 1970, was maximum pool elevation for fiscal 
year. Storage in the flood control pool amounted to 
47,200 acre-feet. Peak inflow was 84,000 cubic feet per 
second on July 26, 1969. On June 30, 1970, pool 
elevation was 577.3 feet above mean sea level and 
storage in the power pool amounted to 1,257,900 acrefeet. 
Condition at end of fiscal year. Project was started in 
August 1947, and completed for beneficial use in 
October 1955, except for public-use facilities. Generation 
of power, and operation and maintenance 
activities are continuing. 
5B. DEGRAY LAKE, CADDO RIVER, ARK. 
Location. On Caddo River (mile 8), a tributary of 
Ouachita River, in a narrow, rocky gorge, in Clark and 
Hot Spring Counties, approximately 7 miles north of 
Arkadelphia, Ark. 
Existing project. Provides for a lake of 881,900 acrefoot 
storage capacity for flood control, water supply, 
and power with an installed power capacity of 68,000 
kilowatts (one conventional 40,000-kilowatt generating 
unit and one 28,000-kilowatt generating unit with 
reversible pump-type turbine.) Latest approved (1970) 
estimated first cost is $60,500,000, including $4,900,000 
to be reimbursed by local interests, exclusive of interest. 
Local cooperation. None required for flood control and 
power features. Fully complied with for water supply 
feature. 
29 
451-584 0-72-28

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. Planning and 
design are basically completed. Construction of main 
tunnel, branch tunnels, intake structure, fault treatment, 
access road, service area, dike toe service road, 
dam and dike, tow road relocations, spillway, office 
building, a portion of lake clearing, and overlook 
building is complete. The dike was completed in 
October 1969. The contract for the reregulating dam 
was awarded in August 1969 and work began in 
September 1969. Construction of the powerplant, lake 
clearing, and recreational facilities was continued. All 
major contracts have been awarded. 
Condition at end of fiscal year. Construction started in 
July 1962, and is about 79 percent complete. 
5C. LAKE GREESON, LITTLE MISSOURI 
RIVER, ARK. 
Location. On Little Missouri River, Ark., 105 miles 
above the mouth and 5 miles northwest of Murfreesboro, 
Ark. 
Existing project. Provides a lake of 407,900 acre-foot 
storage capacity for flood control and other purposes 
with power installation of 25,500 kilowatts in three 
units of 8,500 kilowatts each. Remaining work consists 
of installation of remote control equipment and 
completion of public-use facilities. Latest approved 
(1970) estimated cost of new work is $16,600,000, 
including $1,810,000 for third generating unit and 
remote control equipment. 
Local cooperation. None required. 
Operations and results during fiscal year. Costs were 
$4,255 for public-use facilities and $128,057 for third 
generating unit. Construction of the third generating 
unit was continued. Power production totaled 
33,360,200 kilowatt-hours, of which 32,703,910 kilowatt-
hours were delivered to southwestern Electric 
Power Company under contract between that company 
and Southwestern Power Administration. Pool 
elevation of 550.3 feet above mean sea level, or 2.3 feet 
above maximum power pool on April 28, 1970, was 
maximum pool elevation for fiscal year. Storage in the 
flood control pool amounted to 16,700 acre-feet. Peak 
inflow was 17,000 cubic feet per second on March 3, 
1970. On June 30, 1970, pool elevation was 545.3 feet 
above mean sea level when storage in power pool 
amounted to 182,900 acre-feet. 
Condition at end of fiscal year. Project started in March 
1947 and was completed for beneficial use in February 
1953. The third power generating unit is being 
installed. Contract was awarded in November 1969 for 
installation of remote control equipment. Generation 
of power, operation, and maintenance are continuing. 
5D. BAYOU BARTHOLOMEW AND 
TRIBUTARIES, ARK., AND LA. 
Location. Bayou Bartholomew rises in Jefferson 
County, Arkansas, about 10 miles northwest of Pine 
Bluff, and flows southerly about 370 miles to join the 
Ouachita River upstream from Sterlington, Louisiana. 
Existing project. The project includes 10 water-retention 
reservoirs in the western tributaries of Bayou 
Bartholomew in Arkansas and 6 local levee units along 
the main stem of Bayou Bartholomew in Louisiana. 
However, because of public opposition to construction 
of the loop levees, preconstruction planning of the 6 
loop levees has been deferred until such time as there is 
sufficient support for such levees by local interests. 
Channel improvements previously authorized are 
deferred until .it is determined that the quality and 
quantity of water downstream will not be adversely 
affected. Latest approved (1970) estimated cost of new 
work is $21,630,000, including $20,700,000 Federal 
and $930,000 non-Federal. 
Local cooperation. Local interests will be required to: 
a. Furnish free of cost to the United States all lands, 
easements, and rights-of-way necessary for construction 
of the improvements, with the exception of 
lands for the 10 lakes along the west escarpment of the 
Bayou Bartholomew basin; 
b. Hold and save the United States free from 
damages due to the construction works; 
c. Maintain and operate the levee works in accordance 
with regulations prescribed by the Secretary 
of the Army; and 
d. Agree not to construct permanent irrigation dams 
in Bayou Bartholomew with crest elevations more than 
5 feet above the thalweg of the stream; 
Also, local interests must furnish assurances satisfactory 
to the Secretary of the Army that, in 
accordance with the Federal Water Project Recreation 
Act, they will: 
a. Administer project land and water areas for 
recreation and fish and wildlife enhancement; 
b. Pay, contribute in kind, or repay, which may be 
through user fees, with interest, one-half of the 
separable cost of the lake projects allocated to 
recreation and fish and wildlife enhancement; 
c. Bear all costs of operation, maintenance, and 
replacement of recreation and fish and wildlife lands 
and facilities. 
Operations and results during fiscal year. Preconstruction 
planning and design are underway. 
Condition at end of fiscal year. The field data are being 
obtained and analyzed, and sites selected for the 
individual lakes. 
5E. MONROE FLOODWALL, LA. 
Location. Monroe, Louisiana, lies within the alluvial 
valley of the Mississippi River and on the east bank of 
the Ouachita River. The city is located in the northcentral 
part of Louisiana, in Ouachita Parish. 
Existing project. Provides for construction of floodwall 
to close the 1,750-foot opening extending from Bry 
Avenue to Grammond Street. Floodwall will provide 
430

VICKSBURG, MISS., DISTRICT 
complete flood protection to city of Monroe. Approved 
(1970) estimated Federal cost of new work is 
$2,100,000, Non-Federal cost is $108,000. 
Local cooperation. Local interests will provide necessary 
future maintenance and rights-of-way for construction. 
Operations and results during fiscal year. Preconstruction 
planning and design are underway. 
Condition at end of fiscal year. The present plan of 
closure consists basically of a folding-wall type closure. 
This plan is supported by the Tensas Basin Levee 
Board, the Louisiana Department of Public Works, 
and the city of Monroe. The Tensas Levee Board has 
furnished satisfactory assurances of its capability and 
willingness to provide the requirements of local 
cooperation when requested by the Government. 
6. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspections of local flood control projects turned over 
to local interests were made during FY 70 at the 
following locations: Natchez Port Area, Deep Bayou, 
Tucker Bayou, and Walker Lake Canal, Mississippi; 
Pine Bluff local protection, Little Missouri River, 
Terre Noire Creek, Ozan Creek, and Calion local 
protection, Arkansas; and Bawcomville local protection, 
Baxter Bayou, Big Choctaw Bayou, Columbia 
local protection, Harrisonburg to Little River levees, 
Mill Bayou, Ouachita River levees and floodwalls, 
West Monroe ring levee, and Little Bayou Boeuf, 
Louisiana. 
Fiscal year cost of inspection was $13,961, cost to end 
of fiscal year was $80,199. 
7. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See appropriate table at end of chapter.) 
8. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 205, Public Law 
858, 80th Congress, as amended (preauthorization). 
Initiated reconnaissance report on East Bank Yazoo 
River, Yazoo City, Miss. 
Emergency flood control activities-repairf,l ood fighting, and 
rescue work. (Public Law 99, 84th Cong., and antecedent 
legislation) 
(See Table 12-G at end of chapter.) 
GENERAL INVESTIGATIONS 
9. SURVEYS 
Costs during fiscal year were $321,809, of which 
$10,000 was expended for the flood control study, Little 
Missouri River Basin, including Narrows Dam and 
Lake; $303,806 for a comprehensive basin study, 
Lower Mississippi Region Framework, (of which 
$9,234 was expended by study agencies under contract); 
and $8,003 for coordination with other agencies. 
10. COLLECTION AND STUDY OF BASIC 
DATA 
Flood plain information studies are authorized by 
Section 206 of the 1960 Flood Control Act. The studies 
are made upon request of a State or political 
subdivision thereof. They comprise compilation and 
dissemination of information on floods and flood 
damages, including identification of areas subject to 
inundation by floods of various magnitudes and 
frequencies, and general criteria for guidance of 
Federal and non-Federal interests and agencies in the 
use of flood plain areas, and provide advice to other 
Federal agencies and local interests for their use in 
planning to ameliorate the flood hazard. Fiscal year 
costs of $139,328 for flood plain management services 
are set forth in table 12-H at end of chapter. (See also 
table 12-I on completed flood plain information reports 
and table 12-J on special flood hazard information 
reports.) 
11. RESEARCH AND DEVELOPMENT 
Hydrologic studies: Collecting streamflow and 
rainfall data and making storm and hydrologic studies 
during fiscal year cost $9,925. 
431

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Table 12-A 
See 
Section 
n Text Project Funding 
1. Lake Providence New Work 
Harbor, La. Approp. 
Cost 
Maint. 
Approp. 
Cost 
2. Ouachita and Black New Work 
Rivers Below Camden, Approp. 
Ark. (6.5 foot Cost 
navigation project) 
Maint. 
Approp. 
Cost 
3. Ouachita and Black New Work 
Rivers Below Camden, Approp. 
Ark. (9-foot) Cost 
navigation project) 
4. Yazoo River, Miss. New Work 
5A. Lake Ouachita, 
Ouachita River, Ark. 
5B. DeGray Lake, Caddo 
River, Ark. 
5C. Lake Greeson, Little 
Missouri River, Ark. 
5D. Bayou Bartholomew 
and Tributaries, 
Ark. and La. 
5E. Monroe Floodwall, 
La. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
$- $ - $- $- $ 208,537 
49,500 
:38,062 
623,700 
569,319 
7,620,000 
8,293,080 
29,700 
29,700 
125,000 
117,323 
427,800 
420,398 
7,984,000 
8,260,092 
506,000 
513,122 
321,100 
314,975 
47,000 
58,438 
573,000 
555,380 
9,314,000 
9,310,855 
10,000 
8,034 
129,000 
130,106 
418,000 
437,534 
7,945,000 
7,686,083 
771,000 
706,545 
314,100 
317,121 
150,000 
114,510 
40,000 
24,254 
49,000 
4499,,000000 
719,000 
758,048 
6,982,000 
6,842,490 
47,400 
31,180 
60,000 
39,864 
477,000 
474,058 
6,105,000 
5,984,794 
135,000 
199,593 
376,500 
383,355 
301,000 
313,146 
194,000 
74,781 
49,000 
49,000 
682,300 
662,659 
7,894,000 
5,696,522 
29,500 
22,937 
-11,000 
11,024 
525,800 
521,478 
6,428,093 
6,693,497 
172,000 
132,313 
440,100 
400,336 
119,000 
127,134 
116,000 
52,006 
208,537' 
274,700 
274,700 
5,248,6192 
5,248,6192 
19,505,226 
19,438,350 
41,090,600 
38,624,239 
359,6613 
359,661 
690,015 
665,266 
31,710,344 
31,705,661 
5,209,892 
5,198,828 
47,395,493 
47,090,799 
14,934,230 
14,842,368 
4,863,020 
4,817,747 
570,000 
554,790 
350,000 
151,041 
1. Actual costs include $198,859 Public Works Acceleration 
Act funds and $9,678 expended for planning and design; 
excludes $35,000 contributed funds, and $1,022,000 local 
interests' costs for port facilities. 
2. Includes $674,068 for new work on previous projects. 
3. All cost are for previous projects. 
432 
i

VICKSBURG, MISS., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 14, 1960 
Approved by the Chief of 
Engineers as a small harbor 
under Section 107 of the Act 
May 17, 1950 
July 14, 1960 
March 3, 1875 
August 13, 1968 
May 17, 1950 
May 17, 1950 
Nov. 7, 1966 
May 17, 1950 
Oct. 27, 1965 
LAKE PROVIDENCE HARBOR, LA, (See Section 1 of Text) 
Dredging 0.7 mile channel and turning basin in an old chute 
of the Mississippi River, with the spoil used to fill in a 
port area provided by local interests. 
OUACHITA AND BLACK RIVERS, BELOW CAMDEN, ARK. 
(See Section 2 of Text) 
Modification of existing project to provide for 9-foot 
channel and deepening canal to Felsenthal, Ark. 
Modification of 9-foot project to provide four new locks 
and dams and channel improvements. 
YAZOO RIVER, MISS, (See Section 3 of Text) 
Four-foot channel from mouth to Greenwood, Miss., 189 miles. 
Nine-foot channel from mouth to Greenwood, mile 164.9 
(present mileage), with a lock and dam near Vicksburg, 
channel improvements, additional storage in Sardis Lake 
to augment low river flows, and recreation features. 
OUACHITA RIVER AND TRIBUTARIES, ARK. AND LA. 
(See Section 5 of the Text) 
Authorized DeGray Lake; Murfreesboro Lake; extension of 
floodwall at Monroe to partially close the existing gap; 
local protection at Bawcomville, La. (subsequently 
constructed under Section 6, Act of May 15, 1928, with 
local interests contributing one-third of cost); Bayou 
Bartholomew channel improvement, including Deep Bayou and 
Overflow Creek; Pine Bluff local protection; local 
protection at Calion, Ark.; and incorporation, into the 
Ouachita River and Tributaries project, of all existing 
projects and portions thereof in the basin above the lower 
end of the levees on the east bank of the Ouachita River. 
BAYOU BARTHOLOMEW, ARK. AND LA. (See Section 5D of Text) 
Authorized channel improvements on Bayou and Tributaries 
(see above) 
Modified 1950 authorization to include 10 reservoirs 
in the west escarpment in Arkansas and 6 local levees in 
Louisiana, and acquisition of lands for mitigation of 
fish and wildlife losses. The previously authorized 
channel improvement was deferred until it is determined 
that the quality and quantity of water downstream will not 
be adversely affected. 
MONROE FLOODWALL, LA. (See Section 5E of Text) 
Partial closure of gap in floodwall 
Closure of gap in floodwall (Plan C) 
Sec. 107, P. L. 86-645, 
July 14, 1960, 
as amended. 
S. Doc. 117, 81st Cong., 
1st sess. 
S. Doc. 112, 86th Cong., 
2d sess. 
H. Doc. 342, 90th Cong., 
2d sess. 
S. Doc. 117, 81st Cong., 
1st sess. 
S. Doc. 117, 81st Cong., 
1st sess. 
H. Doc. 506, 89th Cong., 
2d sess. 
S. Doc. 117, 81st Cong., 
2d sess. 
H. Doc. 328, 88th Cong., 
2d sess. 
Closure of gap in floodwall (Plan B) 
433 
TABLE 12-B 
Nov. 7, 1966

TABLE 12-C OUACHITA AND BLACK RIVERS, ARK. AND LA. (9-FOOT PROJECT), LOCKS AND DAMS 
(See Section 2 of text) 
Min. 
Greatest depth 
available on 
Miles length Max. Elev. miter 
above Width for full lift normal sill at 
Miles mouth of width at pool normal 
from of lock of lock low surface pool Kind 
nearest Black chamber chamber water (feet level Character of of Percent Estimated 
Location town River (feet) (feet) (feet) msl) (feet) foundation Dam Type of Construction Complete Cost 
C
y
t3 
84 600 30O 34 14 Piling in clay Movable Tainter gated dam; bascule gated navi 
pass; steel mitering lock gates 
84 600 18 52 13 Piling in clay Movable Tainter gated dam; fixed crest navigat 
steel mitering lock gates; variable cres 
84 600 18 65 13 Earth 
84 600 12 77 13 Earth 
Movable Tainter gated dam; bascule gated navi 
pass; steel mitering lock gates 
Movable Tainter gated dam; bascule gated navi 
pass; steel mitering lock gates 
p 1. Construction not started. 
2. Preliminary design. 
3. Includes $5,899,000 for Catahoula Lake Diversion Channel 
and Control Structure. 
gation 85 $34,845,0003 
tion pass; 100 22,390,000 
t
gation 1 25,395,000 
gation 1 24,370,000 
o
z 
Jonesville, La. 
Columbia, La. 
Felsenthal, Ark. 
Calion, Ark. 2 
10 25 
5 132 
1 243 
7 298

VICKSBURG, MISS., DISTRICT 
TABLE 12-D OTHER AUTHORIZED NAVIGATION PROJECTS 
FuFlol rR Lepaosrt t Total Cost to June 30, 1970 
See Annual Operation and 
Project Report for Construction Maintenance 
Bayou Bartholomew, La. and Ark.1 ,2 ,3 ,4 1931 45,874 42,857 
Bayous D'Arbonne and Corney, La. 1 ,3 ,4 1941 19,000 37,804 
Big Black River, Miss.1 ,4 ,5 1895 15,000 
Big Sunflower River, Miss. 1 , ' 4 ,6 1942 560,027 459,328 
Boeuf River, La.1,3,4,7,8 1949 30,000 103,737 
Homochitto River, Miss.4 1910 15,482 8,518 
Little Missouri River, Ark.1 , 4 ,5 1873 19,992 
Little River, La. 1' 4 ' 5 '9 1890 1,500 
Little Tallahatchie River, Miss.1 1913 19,000 
Mouth of Yazoo River, Miss. 1' 1 1 1953 1,179,211 145,217 
Removing snags and wrecks from Mississippi 
River below mouth of Missouri River and 
from Old and Atchafalaya Rivers. 11 1948 - 272,500 
Saline River, Ark. 1 ' 3 ' 4 '5 1931 26,900 12,792 
Tallahatchie and Coldwater Rivers, 
Miss.1,4, 1 2 1939 43,481 173,066 
Tensas River and Bayou Macon, La. 1 ,7 , ' 1 0 1949 38,367 85,352 
Yalobusha River, Miss. 1 , 4 , 5 , ' 1 3 1937 7,000 15,936 
1. Completed. 
2. Abandonment recommended in H. Doc. 1692, 64th 
Cong., 2d sess., and H. Doc. 467, 69th Cong., 1st sess. 
3. Channels adequate for existing commerce. 
4. Inactive project. No commerce. 
5. Abandonment recommended in H. Doc. 467, 69th Cong., 
1st sess. 
6. Project curtailment recommended by elimination of work 
between Pentecost and mouth of Hushpuckena River. (Abandonment 
of entire Project erroneously recommended in H. Doc. 
467, 69th Cong., 1st sess.). 
7. Report of New Orleans District, pp. 919-920 for fiscal 
year 1949. 
8. Project curtailment recommended by elimination of work 
above Girard, La. (Abandonment of entire project recommended 
erroneously in H. Doc. 467, 69th Cong., 1st sess.). 
9. Due to decline of traffic, local interests not sufficiently 
interested to provide rights-of-way and dumping privileges. 
10. Inactive. Channel adequate for commerce. 
11. No funds available under this project. Work is being 
carried on under appropriation flood control, Mississippi River 
and tributaries. 
12. See report of Mississippi River Commission for operation 
in connection with Yazoo Basin. 
13. See report of Mississippi River Commission for operations 
in connection with Yazoo Basin flood control project including 
channel clearing and rectification and Grenada Lake on 
Yalobusha River. 
435

TABLE 12-E 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OUACHITA RIVER AND TRIBUTARIES: EXISTING PROJECT 
(See Section 5 of text) 
For last Estimated 
full report Federal 
see Annual New Work 
Project Report for Cost 
Lake Ouachita, Ark. $ 34,580,000 
DeGray Lake, Ark. 60,500,0003 
Lake Greeson, Ark. 16,600,000 
Calion, Ark. 1960 970,996 
Columbia, La. 1941 204,740' 
Existing levees and extensions thereto from 1961 3,025,1811 
Bastrop, La., to mouth of Boeuf River and 
at West Monroe, La. 
Little Missouri River below Murfreesboro, Ark. 1957 354,8021 
Ozan Creek, Ark. 1957 57,7421 
Terre Noire Creek, Ark. 1948 123,7001 
Pine Bluff, Ark., local protection 1954 172,5821 
Monroe, La., floodwall extension (Plan B) 2,100,000 
Bayou Bartholomew and Tributaries, Ark., and La. 20,700,000 
Ouachita River Levees (additional work) 2,300,000 
Total 141,689,7432 
1. Actual cost of completed project. 
2. Excludes the Murfreesboro Lake, Ark., which is inactive. 
The latest estimated cost (1954) was $4,190,000. 
3. Includes $4,900,000 to be reimbursed by local interests. 
TABLE 12-F OTHER AUTHORIZED FLOOD CONTROL 
For Last Total Cost to June 30, 1970 
Full Report 
See Annual Operation and 
Name of Project Report for Construction Maintenance 
Big Black River, Miss.1 1956 910,185 670,750 
Big Choctaw Bayou, La.2 1966 248,823 
Buffalo River, Miss.3 1940 - 
Homochitto River, Miss.1 1956 205,000 144,650 
Natchez Port Area, Miss.2 1969 538,000 
Murfreesboro Dam and Lake3 1951 - 
1. Completed. 
2. Authorized by Chief of Engineers under authority of 
Section 205, Flood Control Act of 1948, as amended, and is 
completed. 
3. Deferred indefinitely because of insufficient justification 
under present conditions. 
436

VICKSBURG, MISS., DISTRICT 
TABLE 12-G FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
(See Section 8 of text) 
Project Federal Cost 
Advance preparation $26,964 
Rehabilitation: 
Ouachita River Levee Setback, La. 2,374 
Pelucia Creek, Miss. 27,671 
Calion, Ark. 46,643 
Yalobusha River levee, Miss. 972 
12-H COSTS FOR FLOOD PLAIN MANAGEMENT SERVICES 
(See Section 10 of text) 
Studies and Services Fiscal Year 
Costs 
Flood Plain Information Reports 
Monroe, Louisiana $ 24,932 
Jacksonville, Arkansas 22,667 
Greenville, Mississippi 8,303 
Technical Services and Guidance 
(VXD $49,426 and LMVD $34,000) 83,426 
TOTAL $139,328 
12-I FLOOD PLAIN INFORMATION REPORTS COMPLETED TO DATE 
(See Section 10 of text) 
Location Requesting Date Federal 
Agency Completed Cost 
Vicksburg, Miss. City of Vicksburg & Jun 68 $14,800 
Warren County 
Camden, Ark. City of Camden Sep 68 12,632 
West Monroe, La. City of West Monroe Nov 68 11,362 
& Ouachita Parish 
Arkadelphia, City of Arkadelphia Feb 69 15,901 
Ark. 
Natchez, Miss. City of Natchez & Jun 69 19,264 
Adams Co. 
Monroe, La. City of Monroe & Jun 70 24,933 
Ouachita Parish 
12-J SPECIAL FLOOD HAZARD INFORMATION REPORTS 
COMPLETED TO DATE 
(See Section 10 of text) 
Location Requesting Agency Co lete 
Chauvin Bayou of Department of Housing & May 69 
Monroe, Louisiana Urban Renewal, Federal 
Housing Administration 
437

MEMPHIS, TENN., DISTRICT * 
This district comprises a portion of southeastern 
Missouri and southern Illinois, western portions of 
Kentucky and Tennessee, a small portion of northern 
Mississippi, and eastern portion of Arkansas north of 
the Arkansas River. Includes area embraced in 
drainage basins of eastern tributaries of the Mississippi 
River south of Ohio River Basin to Nonconnah and 
Horn Lake Creeks, inclusive, and those of western 
tributaries south of Little River Diversion Channel and 
Commerce, Missouri, including St. Francis River Basin 
and White River and tributaries below Peach Orchard 
Bluff, Arkansas, on the right bank and below Augusta, 
Arkansas, on the left bank. 
IMPROVEMENTS 
Navigation Page 
Helena Harbor, Ark. ............................ 439 
Hickman Harbor, Ky. ................ 439 
New Madrid Harbor, Mo. ................... 440 
White River, Ark. (below Newport) ..... 440 
Wolf River (Memphis Harbor), Tenn. . 441 
Other authorized navigation projects .... 441 
Navigation work under special 
authorization .......................................... 441 
8. 
9. 
10. 
11. 
12. 
13. 
Flood Control 
Inspection of completed flood control 
projects ............................................ 
Other authorized flood control projects 
Flood control work under special 
authorization ........ .......................... 
General Investigations 
Surveys ........................................... 
Collection and study of basic data ....... 
Research and development ................... 
NAVIGATION 
1. HELENA HARBOR, ARK. 
Location. In Phillips County, Ark., on right bank of 
Mississippi River about 663 miles above Head of 
Passes, Louisiana. 
Existing project. Provides for maintenance of access 
channel with a depth 9 feet below low water, between 
miles 659 and 663 above Head of Passes, Louisiana, by 
dredging and for enlarging the upstream 0.6 mile to 
dimensions of 9 feet deep by approximately 450 feet 
wide. Remainder of channel conforms to project width 
of the main channel of Mississippi River. River stages 
recorded at Helena gage (zero is 141.88 feet msl) since 
1872 have ranged between minus 3.0 and plus 60.21 
feet with an average annual fluctuation of 40.6 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. There are 10 terminals within 
harbor, two of which are publicly owned. Others are a 
rail incline, a small boat dock, grain terminals, a 
petroleum products terminal, a midstream grocery and 
* All cost and financial statements for projects are listed at the 
appear at the end of this chapter. 
refueling service, a fuel unloading facility, and a 
fertilizer loading facility. 
Operations and results during fiscal year. Leased dredge 
Diesel removed 159,172 cubic yards in maintaining 
project channel. 
Condition at end of fiscal year. Project is complete and 
maintained to project dimensions. 
2. HICKMAN HARBOR, KY. 
Location. In Fulton County, Ky., on left bank of 
Mississippi River about 922 miles above Head of 
Passes, La. 
Existing project. Dredging and maintaining harbor 
channel 250 feet wide with depth of 9 feet below low 
water, from main channel of Mississippi River at mile 
922 AHP along former city waterfront about 1.1 miles, 
with the upper 600 feet forming a turning basin 500 
feet wide. New work was completed in fiscal year 1963. 
end of this chapter. All other tables are referenced in,text and also 
439 
1. 
2. 
3. 
4. 
5. 
6. 
7. 
Page 
441 
441 
441 
441 
441 
441

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
River stages recorded since 1929 at Hickman gage 
(zero is 264.73 msl) have ranged between minus 0.4 
and plus 51.5 feet with average annual fluctuation of 
38 feet. Latest published map is in 1969 37th edition, 
Flood Control and Navigation Maps of Mississippi 
River prepared under direction of President, Mississippi 
River Commission. 
Local cooperation. Fully complied with. 
Terminal facilities. Within harbor are terminals for 
handling petroleum products, sand and gravel, grain 
and timber, all private; there is about 0.2 mile of 
surfaced public mooring and launching area. 
Operations and results during fiscal year. Government 
dredge Potter removed 126,658 cubic yards in maintaining 
project channel. 
Condition at end of fiscal year. Project is complete and 
maintained to project dimensions. 
3. NEW MADRID HARBOR, MO. 
Location. New Madrid County, Missouri, on right 
bank of the Mississippi River about 889 miles above 
Head of Passes, Louisiana. 
Existing project. Construction and subsequent maintenance 
of a harbor channel 150 feet wide with a depth 
of 9 feet below low water from the head of New Madrid 
Bar, about mile 889 AHP, along the city waterfront 
downstream for a distance of about 9,400 feet, with a 
250-foot radius turning basin at the downstream end. 
The project was authorized by the Chief of Engineers, 
February 21, 1968, under section 107 of the River and 
Harbor Act of 1960, as amended. Latest published map 
is in 1969 edition, Flood Control and Navigation Maps 
of the Mississippi River, prepared under the direction 
of President, Mississippi River Commission. 
Local cooperation. Local interests will be required to 
furnish lands, easements, rights-of-way, and spoil 
disposal areas; hold and save the United States free 
from damages; relocate utilities as required; provide 
terminal facilities for all on equal terms; construct 
necessary access roads and shore facilities; assume 
responsibility for construction costs in excess of 
$500,000; and maintain navigable depths in berthing 
areas. They have given assurances that they will 
comply with all requirements of local cooperation. 
Terminal facilities. Within the harbor are privatelyowned 
terminals for handling petroleum products, logs 
and lumber, and soybeans and grain. Terminal 
facilities are considered adequate for present and 
immediately foreseeable commerce. 
Condition at end of fiscal year. Authorized and funded 
for construction, but not begun in FY 70. 
4. WHITE RIVER, ARK. (BELOW 
NEWPORT) 
Location. Rises in northwestern Arkansas and flows 
686 miles, first north into Missouri, thence southeasterly 
through Arkansas to the Mississippi River 64 
miles below Helena, Arkansas. (See Mississippi River 
Commission alluvial valley maps, scales 1:62,500 and 
1:500,000, and maps of White River, vicinity of 
Batesville, Arkansas, to Mississippi River, scale 
1:62,500.) White River enters Memphis District at foot 
of Peach Orchard Bluff, Arkansas, 165 miles above its 
mouth; but Memphis District is responsible for 
maintenance of navigation channel as far upstream as 
Newport, Arkansas, mile 255. 
Previous projects. For details, see page 1874, Annual 
Report for 1915, and page 938, Annual Report for 
1938. 
Existing project. Maintenance of a channel 4.5 feet 
deep by 100 feet wide between mouth of river and 
Batesville, 296 miles, by snagging, dredging, and 
contraction works. Maintenance discontinued after 
fiscal year 1951 due to negligible traffic; dredging and 
snagging resumed in 1962. White River channel from 
mouth to mile 10 has been improved and is being 
maintained as part of the Arkansas River Project. The 
existing project was modified by OCE, March 1, 1968, 
under authority of section 107 of the 1960 River and 
Harbor Act, to provide a 125-foot wide channel with 
minimum depth of 5 feet and a depth of 8 feet at a stage 
of 12 feet on the Clarendon gage. Increased dimensions 
extend from the mouth to Augusta, at mile 199. The 
first cost is estimated at $169,994, including $20,245 for 
preauthorization studies, and increased annual maintenance 
cost was $45,000. 
Local cooperation. Local interests are required to 
furnish lands, easements, rights-of-way, and spoil 
disposal areas; hold and save the United States free 
from damages; relocate utilities as required; provide 
terminal facilities for all on equal terms; construct 
necessary access roads and shore facilities. They have 
given assurances that they will comply with all 
requirements of local cooperation. 
Terminal facilities. Consist of terminals for handling 
riprap stone, sand and gravel, logs, soybeans, wheat, 
and rice at Augusta (mile 198); logs, soybeans, wheat, 
and rice at Des Arc (mile 143); public launching ramp 
at 1-40 bridge, logs, lumber, soybeans, and rice at 
Clarendon (mile 99); soybeans at Crocketts Bluff (mile 
68); soybeans, rice, sand, gravel, and crushed stone at 
St. Charles (mile 57); and riprap stone at Benzal (mile 
7.5). 
Operations and results during fiscal year. Dredging at 
various locations between mouth of White River and 
Augusta, Arkansas, to provide a navigation channel 4.5 
feet deep by 100 feet wide below Augusta. Leased 
dredge Tennessee moved 382,800 cubic yards in maintaining 
project channel. Maintenance costs were 
$183,385 for dredging. 
Condition at end offiscalyear. The project, authorized in 
1892, is for maintenance and completion is not 
contemplated. Project depth at low water is maintained 
by dredging as required. Total cost to June 30, 
1970, was $2,933,336, excluding $25,000 for early 
440

MEMPHIS, TENN., DISTRICT 
construction on previous projects and preauthorization 
study cost of $20,245 for section 107 project. 
5. WOLF RIVER (MEMPHIS HARBOR), 
TENN. 
Location. Rises near western edge of Tippah County, 
Miss., and flows generally northwesterly through 
Shelby County, Tenn., entering the Mississippi River 
above Memphis, Tenn. (mile 738.7 AHP). The lower 
3.5 miles of channel, parallel to the Mississippi River 
along the Memphis waterfront, became a slack-water 
harbor when Wolf River was diverted through Mud 
Island to the Mississippi River by a flood control 
project, Wolf River and tributaries, under the Flood 
Control Act of 1958. (See Mississippi River Commission 
alluvial valley maps, scales 1:62,500, and 
1:500,000 and folio of Flood Control and Navigation 
Maps of the Mississippi River, Cairo, Ill., to Gulf of 
Mexico, scale 1:62,500, revised annually.) 
Previous projects. For details see pages 701 and 702, 
Annual Report for 1962. 
Existing project. The project provides a channel 9 feet 
deep at low water from mouth to mile 3, with bottom 
widths of 250 feet from mouth to Keel Avenue (mile 
1.75) and 200 feet from Keel Avenue to mile 3. 
Local cooperation. Fully complied with. 
Terminal facilities. Twenty terminals along project 
channel. One terminal is operated by Coast Guard, 
two by contract carriers, and 17 are operated privately. 
Operations and results during fiscal year. Maintenance 
dredging was performed with one leased dredge, the 
Diesel, which moved 250,698 cubic yards of material to 
maintain project channel. 
Condition at end of fiscal year. Existing project is 
complete, and project channel has ample depths. 
Project depth at low water is maintained by dredging 
as required. Exclusive of maintenance dredging in 
fiscal year 1936 with Mississippi River funds which 
were included in annual report of Mississippi River 
Commission for that year under caption, "Dredges and 
Dredging," total Federal cost to June 30, 1970, was 
$3,322,425, of which $586,500 were public funds for 
new work, $2,735,924 regular funds for maintenance, 
and to cover cost of retaining levees required of local 
interests, $17,500 was charged to contributed funds. 
6. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See table 13-C) 
7. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to section 107, Public Law 86- 
645, as amended (preauthorization) 
Fiscal year costs were $1,188 for Osceola Harbor, 
Ark., study. 
FLOOD CONTROL 
8. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
(See table 13-D for projects inspected.) 
9. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See table 13-E) 
10. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 
858, 80th Congress, as amended (preauthorization) 
Fiscal year costs for preauthorization studies were 
$22,811 for Long Lake Area, Helena, Ark., $5,248 for 
Eight Mile Creek, Paragould, Ark., and $26,202 for 
West Hickman, Ky., $45,950 for Dyersburg, Tenn. 
Emergencyf lood control activities-repairf,l ood fighting, and 
rescue work (Public Law 99, 84th Cong., and antecedent 
legislation). 
Federal costs for fiscal year were $22,684 for advance 
preparation, and $50,030 for Cottonwood Slough 
Culvert-Cache River. Total cost to June 30, 1970 was 
$3,366,847.
GENERAL INVESTIGATIONS 
11. SURVEYS 
Costs during fiscal year were $3,000 for review of 
watershed studies from other agencies, and $32,000 for 
White River, Arkansas, navigation study. 
12. COLLECTION AND STUDY OF BASIC 
DATA 
Flood plain information studies as authorized by 
Section 206, 1960 Flood Control Act, as amended, 
comprise compilation and dissemination, upon the 
request of a State or political subdivision thereof, of 
information on floods and flood damages, including 
identification of areas subject to inundation by floods of 
various magnitudes and frequencies, and general 
criteria for guidance of Federal and non-Federal 
interests and agencies and local interests for their use in 
planning to reduce the flood hazard. Fiscal year costs of 
$124,629 for flood plain management services are set 
forth in table at end of chapter (table 13-F). See also 
tables on other broad actions related to the FPMS 
program for FY 70, (table 13-G), completed flood plain 
information reports (table 13-H), and special flood 
hazard information reports (table 13-I). 
13. RESEARCH AND DEVELOPMENT 
Hydrologic studies were made during the year at a 
cost of $4,593. 
441

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 13-A MEMPHIS COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
1. Helena Harbor, New Work 
Ark. Approp. - - - - 88,919 
Cost - - - - 88,919 
Maint. 
Approp. 6,900 126,300 58,800 49,000 334,800 
Cost 33,959 121,623 58,239 52,671 332,497 
2. Hickman New Work 
Harbor, Ky. Approp. - - - - 149,827 
Cost - - - - 149,827 
Maint. 
Approp. 69,025 - 79,200 49,112 239,936 
Cost 69,025 - 77,928 21,036 210,588 
3. New Madrid Harbor, New Work 
Mo. Approp. - - - 190,000 203,000 
Cost 2,567 200 - 3,540 3,540 
4. White River, New Work 
Ark. Approp. - - - 150,000 170,245 
Cost 1,952 - - 149,749 169,994 
Maint. 
Approp. 157,475 147,700 167,200 221,500 2,855,615 
Cost 160,313 137,030 150,986 183,385 2,783,587 
5. Wolf River, New Work 
Memphis Harbor, Approp. - - - - 586,500 
Tenn. Cost - - - - 586,5002 
Maint. 
Approp. 70,200 37,000 78,400 63,700 2,739,788 
Cost 71,769 39,169 73,719 64,614 2,735,9253 
1. Excludes $25,000 expenditures for early construction; 
includes $20,245 for preauthorization studies on Sec. 107 
Project. 
2. Excludes $17,500 contributed funds expended. 
3. Includes $35,000 deferred maintenance channel and 
harbor funds FY 1957. 
442

MEMPHIS, TENN., DISTRICT 
TABLE 13-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
HELENA HARBOR, ARK. (See Section 1 of Text) 
Sec. 107, R&H 1960 Channel 9 feet deep at low water between miles 659 PL 86-645, 86th Cong., 
and 663 AHP. 2d sess. 
HICKMAN HARBOR, KY. (See Section 2 of Text) 
Sec. 107, R&H 1960 Channel 9 feet deep at low water and 250 feet wide PL 86-645, 86th Cong., 
at mile 922 AHP along former city waterfront 2d sess. 
1.1 miles, with upper 600 feet forming turning 
basin 500 feet wide. 
NEW MADRID HARBOR, MO. (See Section 3 of Text) 
Sec. 107, R&H 1960 Channel 9 feet deep at low water and 150 feet wide at PL 86-645, 86th Cong., 
mile 889 AHP, along the city waterfront 9,400 feet 2d sess. 
with a turning basin 250 feet wide. 
WHITE RIVER, ARK. (See Section 4 of Text) 
July 13, 1892 Open channel work, mouth to Annual Report, 1893, 
Batesville. page 2112. 
Sec. 107, R&H 1960 Channel enlargement, mile 10 to Augusta. Detailed Project Report, 
White River Navigation, 
Mar. 11, 1968. 
WOLF RIVER, TENN. (See Section 5 of Text) 
Aug. 30, 1935 Channel 9 feet deep at low water H. Docs. 26, 72d Cong., 
and 250 feet wide to mile 1.75; 1st sess., and 45, 
200 feet wide to mile 3.5; 74th Cong., 1st sess. 
thence 125 feet wide to mile 5.5. 
July 3, 1958 Flood control work in lieu of navigation H. Doc. 76, 85th Cong., 
improvements above mile 3. 1st sess. 
1. Contains latest published map. 
TABLE 13-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Forked Deer River, Tenn., including 
South Fork1 '2 1912 25,000 12,818 
Obion River, Tenn. 1'3 1911 28,716 
Removing snags and wrecks from 
Mississippi River below mouth of 
Missouri River and from Old and 
Atchafalaya Rivers4 , 5 1948 - 318,833 
St. Francis and L'Anguille Rivers and 
Blackfish Bayou, Ark.',2 1942 92,000 300,449 
1. No commerce. 
2. Existing project is for maintenance only. 
3. Recommended for abandonment in H.Doc. 467, 69th 
Congress., 1st sess. 
4. Completed. 
5. No funds available under this project. Work being carried 
on under "Appropriation, Flood Control, Mississippi River and 
tributaries." 
443

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 8 of Text) 
Location 
Mounds, Ill. 
Memphis, Tenn. 
Loosahatchie River, Tenn. 
Middle Fork, Obion River, Dresden, Tenn. 
Middle Fork, Obion River, Spring Creek, Tenn. 
South Fork, Obion River, Jarrell, Tenn. 
Ten-Mile Ditch, Ark. 
Dyersburg, Tenn. 
Hubble Creek, Mo. 
Locust and Johnson Creeks, Ark. 
Mounds City, Ill. 
Nixon and Meridian Creeks, Tenn. 
Flaat Road Slough, Ark. 
Little slough Ditch, Ark. 
Fiscal Year cost was $9,937, total cost to June 30, 1970, was $63,267. 
TABLE 13-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Total to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Big Creek and L'Anguille River, White 
River Basin, Ark.1 1937 
Clarendon to Laconia Circle, White 
River Basin, Ark.' 1937 
Cottonwood Slough pumping plant, 
illinois2 ,3 1964 147,000 
Dyersburg, Tenn. 2 '3 1962 229,6494 
Memphis, Wolf River, and Nonconnah 
Creek, Tenn.3 1960 11,141,199 
Mounds and Mound City, Ohio River 
Basin, 11s. 5 1955 1,132,704 
Nixon Creek, Tenn.2 ' 3 1952 62,821 
1. Inactive, awaiting local cooperation. 
2. Authorized by Chief of Engineers under small project 
authority, section 205, Flood Control Act of 1948, as amended. 
3. Completed. 
4. Includes $21,863 contributed funds. 
5. Work being completed under Mississippi River and 
Tributaries project. 
444 
TABLE 13-D 
Date 
Aug 69 
Oct 69 
Oct 69 
Jul 69 
Aug 69 
Jul 69 
Oct 69 
Sep 69 
Jul 69 
Jun 70 
Jul 69 
Nov 69 
May 70 
Jun 70

MEMPHIS, TENN., DISTRICT 
TABLE 13-F COSTS FOR FLOOD PLAIN MANAGEMENT SERVICES 
(See Section 12 of Text) 
Fiscal Year 
Studies and Services Costs 
Flood Plain Information Reports 
Bolivar, Tennessee $ 9,999 
Jonesboro, Arkansas 19,032 
Huntingdon, Tennessee 16,521 
Humboldt, Tennessee 6,639 
Technical Services and Guidance 72,439 
TOTAL $124,629 
TABLE 13-G OTHER BROAD ACTIONS RELATED TO THE FLOOD PLAIN 
MANAGEMENT SERVICES PROGRAM FOR FY 1970 
(See Section 12 of Text) 
Requesting Date 
Project Location Agency Completed 
Floodway South Fork Forked Deer Tennessee State Feb 70 
Evaluation River & Sugar Creek Planning 
Henderson, Tennessee Commission 
Flood Plain Mayfield Creek Corps of Feb 70 
Information Mayfield, Kentucky Engineers 
Appendix 
Flood Proofing Harris Fork Creek Corps of May 70 
Investigation Fulton, Kentucky Engineers 
Flood Profiles Eight Mile Creek Economic Aug 69 
& Plan Maps Vicinity of Paragould, Development 
Arkansas Administration 
Flood Profiles Spring Creek, Vicinity Department of Sep 69 
& Overflow of Forrest City, Housing & Urban 
Maps Arkansas Development 
Flood Profiles Whiteman's Creek Economic Dec 69 
& Overflow Jonesboro, Arkansas Development 
Maps Administration 
445 
451-584 0-72-29

TABLE 13-H 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
FLOOD PLAIN INFORMATION REPORTS COMPLETED TO DATE 
(See Section 12 of Text) 
Requesting Date Federal 
Location Agency Completed Cost 
Trenton, Tenn. City of Trenton Jul 65 $18,518 
Jackson, Tenn. City of Jackson May 67 28,982 
Henderson, Tenn. City of Henderson Jan 68 20,600 
Dyersburg, Tenn. City of Dyersburg Aug 68 27,223 
Union City, Tenn. City of Union City Nov 68 25,001 
DeWitt, Ark. City of DeWitt Jun 69 26,000 
Humboldt, Tenn. City of Humboldt Feb 70 21,848 
TABLE 13-I SPECIAL FLOOD HAZARD INFORMATION REPORTS 
COMPLETED TO DATE 
(See Section 13 of Text) 
Requesting Date 
Location Agency Completed 
Gray's & Mary's Creeks Memphis & Shelby Apr 70 
Shelby County, Tenn. County Planning 
Commission 
Mississippi River, Missouri Water Jun 70 
Mississippi, New Resources Board 
Madrid & Pemiscot 
Counties, Mo. 
446

ST. LOUIS, MO., DISTRICT* 
This district comprises those portions of southwestern 
Illinois and eastern Missouri embraced in 
drainage basin of Mississippi River and its western 
tributaries, exclusive of the Missouri River, from the 
mouth of the Ohio River to mile 300 and of its eastern 
tributaries to Hamburg Bay at mile 261 on left bank, 
exclusive of tributary basin of Illinois Waterway 
upstream of new La Grange lock and dam at mile 
80.15 above confluence of the Illinois and Mississippi 
Rivers. District also includes drainage basin in Missouri 
tributary to the Little River diversion channel. 
Report on the Mississippi River between the Missouri 
River and mile 300 is included in separate report on 
the Mississippi River between the Missouri River and 
Minneapolis, Minn. Report on that portion of the 
Illinois River downstream of new La Grange lock and 
dam is included in report of the Chicago District on the 
Illinois Waterway, Ill. and Ind. 
IMPROVEMENTS 
Navigation Page 
1. Illinois Waterway, Ill. (St. Louis, Dist.) 447 
2. Kaskaskia River, Ill. ............................. 447 
3. Mississippi River between Missouri 
River and Minneapolis, Minn. (St. 
Louis Dist.) ..................................... 448 
4. Mississippi River between Ohio and 
Missouri Rivers .................................. 448 
5. Other Authorized Navigation Projects .. 449 
Flood Control 
6. East St. Louis and vicinity, Ill. ........... 
7. Harrisonville and Ivy Landing 
Drainage and Levee District No. 2, 
Ill ............................. ............................ 
8. Kaskaskia River, Ill ............................... 
8A. Carlyle Lake ......................................... 
8B. Lake Shelbyville ...................................... 
8C. Village of New Athens, Ill. ................... 
8D. Vandalia Drainage and Levee District 
No. 21 ......................................... 
8E. Dively Drainage and Levee District 
No. 23 ......................................... 
9. Meramec River Basin, Mo. .................... 
449 
449 
450 
450 
451 
451 
Flood Control (cont.) Page 
9A. Meramec Park Lake ................................ 452 
9B. Union Lake ..................................... 452 
10. Mississippi River at St. Louis, Mo....... 453 
11. Prairie du Pont Levee and Sanitary 
District, Ill....................................... 453 
12. Rend Lake, Big Muddy River, Ill....... 453 
13. Upper Mississippi River Basin (St. 
Louis Dist.) ............................................ 454 
13A. Wood River Drainage and Levee 
District, Ill. ..................................... 454 
14. Inspection of completed flood control 
projects ..................................... 454 
15. Other authorized flood control projects 454 
16. Flood control work under special 
authorization ..................................... 454 
Multiple-Purpose Project Including Power 
17. Clarence Cannon Dam and Reservoir, 
Salt River, Mo ...................................... 
451 
18. 
451 19. 
452 20. 
General Investigations 
Surveys ................................................ 
Collection and study of basic data ....... 
Research and development ................... 
455 
455 
455 
455 
NAVIGATION 
1. ILLINOIS WATERWAY, ILL. (ST. 
LOUIS DIST.) 
See report on Illinois Waterway, Ill. and Ind., under 
Chicago District. 
2. KASKASKIA RIVER, ILL. 
Location. Rises in Champaign County, Ill. about 5 
miles northwest of Urbana, in east-central part of the 
State. It flows southwesterly about 325 miles and 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
447

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
empties into Mississippi River about 8 miles above 
Chester, Ill., or about 118 miles above mouth of Ohio 
River. (See Cincinnati sheet of maps of United States 
published by Army Map Service, scale 1:500,000.) 
Previous project. For details see Annual Report for 
1896, page 1761. 
Existing project. Improvement for navigation will 
provide a channel 9 feet deep and 225 feet wide from 
mouth to Fayetteville, Ill. Improvement will consist of 
enlarging present channel where required, making 
overbank cutoffs to eliminate sharp bends, and 
construction of a dam at about mile 0.8 with a single 
lock 84 feet wide and 600 feet long, at an estimated 
construction cost of $105,560,000 (1970) including a 
$1,500,000 local contribution. 
Local cooperation. State of Illinois passed legislation 
authorizing Illinois Department of Public Works and 
Buildings to enter into assurances of local cooperation 
with the United States. These assurances have been 
furnished and were accepted November 23, 1965. The 
State is continuing with land acquisition. 
Operations and results during fiscal year. Construction of 
the canal, roads, and lock and dam continued. Work 
was initiated on railroad alterations. Engineering and 
design continued on remaining construction items. 
Condition at end of fiscal year. Project is about 22 percent 
complete. 
3. MISSISSIPPI RIVER BETWEEN 
MISSOURI RIVER AND 
MINNEAPOLIS, MINN. (ST. LOUIS 
DIST.) 
See section of this annual report entitled "Mississippi 
River between Missouri River and Minneapolis, 
Minn." 
4. MISSISSIPPI RIVER BETWEEN OHIO 
AND MISSOURI RIVERS 
Location. Mississippi River rises in Lake Itasca, 
Minn., and from that lake flows southerly about 2,340 
miles and empties into the Gulf of Mexico. Portion 
included in this report embraces the 195-mile section 
known as middle Mississippi, between tributary Ohio 
and Missouri Rivers about 974 to 1,169 miles from the 
gulf. See folder by Corps of Engineers of Navigation 
Charts Middle and Upper Mississippi River, Cairo, 
Ill., to Minneapolis, Minn. 
Previous projects. For details see page 1879 of Annual 
Report for 1915, and page 1014 of Annual Report for 
1938. 
Existing project. Provides for obtaining and maintaining 
a minimum channel depth of not less than 9 
feet, a minimum width of not less than 300 feet at low 
water, with additional widths in bends from mouth of 
Ohio River (about 974 miles from gulf) to northern 
boundary of city of St. Louis, mile 191; thence 200 feet 
wide, with additional width in bends to mouth of 
Missouri River, mile 195; to be obtained: (1) by 
regulating works, for closing secondary channels, 
contracting river by building new banks where river 
width is excessive and protecting new and old banks 
from erosion where necessary to secure permanency at 
an estimated construction cost (1970) of $76,800,000; 
(2) by dredging to maintain project channels; (3) by 
construction of works authorized for Chain of Rocks 
reach in 1945 River and Harbor Act, which approved a 
comprehensive plan for development of the river at 
Chain of Rocks to provide for construction of a lateral 
canal at an estimated construction cost (1970) of 
$55,200,000 and (4) by construction of a fixed-crest 
rockfill dam about 900 feet below Chain of Rocks 
Bridge, authorized by 1958 River and Harbor Act, at 
cost of $4,353,000, excluding $7,000 costs to Coast 
Guard for aids to navigation. Estimated cost of new 
work (1970) is $136,353,000. A small boat harbor 
opposite Chester, Ill., is inactive and excluded from 
foregoing cost estimate. Estimated cost (July 1960) of 
this portion is $166,600 including $55,000 non-Federal 
contribution, and excluding $1,000 Coast Guard cost. 
See House Document 669 (76th Cong., 3d sess.) for 
report of Chief of Engineers dated February 27, 1940, 
containing a general plan for improvement of Mississippi 
River between Coon Rapids Dam and mouth 
of Ohio River for purposes of navigation, power 
development, flood control, and needs of irrigation. 
Local cooperation. None required. 
Terminal facilities. Considered adequate for existing 
commerce. 
Operations and results during fiscal year. 
Regulating Works: Contract work continued on stone 
dike construction as did engineering and design and 
supervision and administration. 
Chain of Rocks: Engineering and design for guidewalls 
and tie-down of upper sill continued. 
Dam 27: Project is complete. 
Maintenance: Work consisted of 19,155 feet of dike 
repair and 5,550 feet of revetment repair. U. S. plant 
hired labor performed channel dredging at 20 locations, 
removing 4,230,400 cubic yards of material 
from main channel. Channels dredged had a combined 
length of 13.6 miles, an average width of 290 feet, and 
an average gain in depth of 5.5 feet. Condition and 
operation studies, recreation planning, engineering 
and design, and operation and maintenance of Lock 27 
and Dam 27 continued. 
Condition at end of fiscal year. Construction on existing 
project began in 1881 and project has been in 
beneficial use practically from its inception. Work on 
the project is about 80 percent complete. Work 
required to complete the project includes construction 
448

ST. LOUIS, MO., DISTRICT 
of 48,095 linear feet of dikes; 35,000 linear feet of 
revetment; removal of 100,000 cubic yards of rock; 
removal of 100,000 cubic yards by dredging; upper and 
lower guidewalls at Lock No. 27; and alterations to 
sills. Channel as a whole has been greatly improved by 
the work completed to date. Dredging is required at 
low stages to remove temporary shoals and maintain 
required channel depths. Navigation season formerly 
extended from mid-February to mid-December, the 
river generally closed by ice remainder of year. 
However, in recent years increased demands of 
commerce and use of steel-hull boats have combined to 
extend navigation season throughout the year except 
when blocked by heavy ice or gorges. River is generally 
above 10-foot stage, St. Louis gage, from latter part of 
February to latter part of August, during which time 
project channel depths generally prevail without 
dredging. Mean stage of river, St. Louis gage, was 13.23 
feet for fiscal year 1969 and 12.16 feet for fiscal year 
1970. A study is underway to determine whether project 
criteria need to be revised in order to assure a 
dependable 9-foot project depth. 
5. OTHER AUTHORIZED NAVIGATION 
PROJECTS. 
See table 14-E at end of text. 
FLOOD CONTROL 
6. EAST ST. LOUIS AND VICINITY, ILL. 
Location. In St. Clair and Madison Counties, Ill., on 
the left bank of the Mississippi River between river 
miles 175 and 195 above the Ohio River. Project 
includes all bottom lands between bluffs on the east 
and Mississippi River and Chain of Rocks Canal on 
the west, and extends from Cahokia diversion channel 
on the north to Prairie du Pont Creek on the south. 
(See Corps of Engineers Navigation Charts, Middle 
and Upper Mississippi River, Cairo, Ill., to Minneapolis, 
Minn.) 
Existing project.: The 1936 Flood Control Act authorized 
raising and enlarging existing levee system by 
construction or reconstruction of 19.8 miles of levee, 
including 3.1 miles of floodwall, together with necessary 
appurtenant works consisting of gravity drainage 
structures, highway and railroad closure structures, 
alterations and reconstruction of existing pumping 
plants, alterations to railroad bridges and approaches 
at levee crossings, service roads on levee crown, and 
seepage control measures. Work under this authorization 
will provide the area protection against a 
flood of about 200-year frequency. The completed 10 
miles of levee along Chain of Rocks Canal and Lock 27 
provides flood protection on the landward side integral 
with and to the same degree as the East St. Louis levee. 
Estimated cost of work under this authorization is 
$21,955,000 (1970). The Flood Control Act of 1965 
modified existing project to provide for channel 
improvements, diversion ditches, flood plain detention 
areas, a reservoir on Little Canteen Creek, and a 
pumping plant to considerably reduce damages resulting 
from interior flooding. This act also authorized 
reconstruction of a channel stabilization dam in 
Cahokia Creek diversion channel to provide protection 
to adjacent levees and bridges from scour and eventual 
loss. Estimated Federal cost of work under this 
authorization is $11,100,000 (1970). 
Local cooperation. Fully complied with for work under 
1936 authorization. For work authorized by Flood 
Control Act of 1965, local interests must provide lands, 
easements, and rights-of-way for construction; hold the 
United States free from damages due to the construction 
works; make relocations of and modifications 
to highway bridges, streets, roads, sewers, and utilities; 
maintain and operate all the works after completion 
including removal of silt and debris from impoundment 
areas and channels in accordance with 
regulations prescribed by the Secretary of the Army; 
prevent encroachment on improved channels, ponding 
areas, and detention areas including the reservoir, and 
if encroachment occurs or capacities are impaired, 
provide substitute storage or equivalent pumping 
capacity promptly without cost to the United States; 
and at least annually notify interests affected that the 
project provides only partial protection from the larger 
floods. East Side Levee and Sanitary District, the 
potential sponsor, has legal authority to execute 
assurances for the project, but does not have financial 
capability at this time. The low water dam has been 
designated as a separable and usable segment of the 
project for the purpose of obtaining local assurances. 
The Wood River Drainage and Levee District and 
East Side Levee and Sanitary District are able to 
furnish the requirements of local cooperation (Section 
3, Flood Control Act of 1936) for the channel 
stabilization dam. The State of Illinois is currently 
studying the feasibility of sponsoring the interior 
drainage project. 
Operations and results during fiscal year. Preconstruction 
planning was continued on project modifications 
authorized by Flood Control Act of 1965. 
Condition at end of fiscal year. Project constructed under 
authority of Flood Control Act of 1936 is essentially 
complete. Construction has not started on modifications 
authorized by Flood Control Act of 1965. 
7. HARRISONVILLE AND IVY LANDING 
DRAINAGE AND LEVEE DISTRICT 
NO. 2, ILL. 
Location. In Monroe County, Ill., on left bank of the 
Mississippi River between river miles 141 and 156 
above the mouth of Ohio River. (See St. Louis, Mo., 
map published by Army Map Service, scale 
1:250,000.) 
Previous project. For details, see page 676 of Annual 
Report for 1957. 
449

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Existing project. Project area contains about 27,800 
acres protected from floods of the Mississippi River and 
Fountain Creek by levees. However, when Mississippi 
River stage exceeds 15 feet on the St. Louis, Mo., gage, 
substantial damage results from impoundment of 
precipitation which falls on the area, runoff from 
adjacent hill land, and Mississippi River seepage. The 
1962 Flood Control Act provides for construction of 
two pumping stations to reduce interior flooding. 
Estimated cost (1970) is $2,000,000. 
Local cooperation. Local interests must provide lands, 
easements, and rights-of-way for construction; hold the 
United States free from damages; maintain and 
operate project after completion; prevent encroachment 
on improved channel and ponding areas 
and, if ponding areas and capacities are impaired, 
provide substitute storage capacity or equivalent 
pumping capacity promptly without cost to the United 
States. Local interests have indicated their willingness 
to provide necessary cooperation. 
Operations and results during fiscal year. Preconstruction 
planning was continued on project modifications 
authorized by Flood Control Act of 1962. 
Condition at end of fiscal year. Project constructed under 
authority of Flood Control Act of 1936 is complete. 
General design memorandum is being revised in 
accordance with recommendations of higher authority. 
8. KASKASKIA RIVER, ILL. 
Location. Rises in Champaign County, Ill., about 5 
miles northwest of Urbana, in east-central part of the 
State. It flows generally southwesterly about 325 miles 
and empties into the Mississippi River about 8 miles 
above Chester, Ill., or 118 miles above mouth of Ohio 
River. (See Nashville and Cincinnati sheets of maps of 
United States, published by Army Map Service scale 
1:500,000. Also Geological Survey quadrangle maps, 
1:62,500.) 
Existing project. Provides for construction of a dam at 
Carlyle and five levee projects between Carlyle and 
New Athens authorized by 1936 Flood Control Act, and 
construction of a dam at Shelbyville, six levee projects 
along river between Cowden and Vandalia, and a local 
protection project at New Athens, all authorized by 
1958 Flood Control Act. Under the plan, Carlyle Lake 
and Lake Shelbyville would be operated as a multiplepurpose 
project for local and Mississippi River flood 
control, domestic and industrial water supply, releases 
in the interest of navigation on the Mississippi River, 
fish and wildlife conservation, and recreation. The 11 
levee projects would provide protection to about 54,610 
acres of land. In view of inclusion of previously 
authorized Carlyle Lake and the levees between 
Carlyle and New Athens in recommended plan, 
general comprehensive plan for flood control and other 
purposes in Upper Mississippi River Basin, approved 
by 1938 Flood Control Act, was modified by deleting 
Carlyle Lake and levees between Carlyle and New 
Athens. Flood Control Act of 1965 modified the Flood 
Control Act of 1958 to: (a) delete requirement that 
local interests make a cash contribution to the cost of 
levees between Cowden and Vandalia because of 
changed land use, and (b) require that local interests 
make a cash contribution equal to full cost of 
acquisition of flowage easements in those lands 
acquired by the United States which, upon completion 
of the levee in District No. 22, will not be required for 
construction, operation and maintenance of Carlyle 
Lake. (See table 14-C.) 
Operations and results during fiscalyear. Construction and 
land acquisition continued on Carlyle Lake and Lake 
Shelbyville and construction was completed on New 
Athens. Preliminary planning continued on Vandalia 
District No. 21 and Dively District No. 23. 
Maintenance: Continued on Carlyle and Shelbyville. 
Condition at end of fiscal year. See individual reports for 
Carlyle, Shelbyville, New Athens, Vandalia District 
No. 21, and Dively District No. 23. Due to lack of local 
interest and support at this time, levee districts Nos. 3, 
4, 8, 10, 13, 22, 27, 28, and 28A are in an inactive 
category. 
8A. CARLYLE LAKE. 
Location. Dam is on Kaskaskia River at mile 107, 
about 1 mile upstream from Carlyle, Ill. Reservoir 
extends north-eastward to river mile 153, through 
Clinton, Marion, Bond, and Fayette Counties, Ill. (See 
Cincinnati sheet of maps of United States published by 
Army Map Service, scale 1:500,000. Also see Geological 
Survey quadrangle maps, scale 1:62,500.) 
Existing project. A compacted earthfill dam with a 
concrete spillway section. Spillway structure consists of 
an ogee overflow section surmounted by four 38- by 39- 
foot tainter gates. Dam is 67 feet above streambed and 
6,570 feet long. Because of topography near dam, it was 
necessary to construct two earthfill saddle dams east of 
Carlyle, in order to contain maximum pool level 
proposed for reservoir. A loop levee was constructed for 
protection of Keyesport, Ill. Relocation or alterations 
were required to Chicago, Burlington & Quincy 
Railroad, highways, pipelines, oil field facilities, water 
supply facilities, power and telephone lines, and 
cemeteries. Maximum reservoir area is 57,500 acres 
and maximum storage capacity is 983,000 acre-feet; 
permanent pool area is 26,000 acres. Total project cost 
(1970) is $42,021,000, of which $8,223,400 is for lands 
and damages. Local contribution toward cost of project 
is $3,291,000 for water supply. 
Local cooperation. In accordance with provisions of 
authorizing act, cost of storage to be allocated to water 
supply in Carlyle Lake and annual cost of operation 
and maintenance of such storage would be reimbursed 
by the users. State of Illinois executed a contract with 
the United States providing for payment of 7.85 
percent of cost of project and 8.62 percent of actual 
450

ST. LOUIS, MO., DISTRICT 
Federal costs for operation and maintenance. Percentages 
set forth were determined by separable costremaining 
benefits methods. Contract was approved by 
the Secretary of the Army. State of Illinois is currently 
making payments thereunder. 
Operations and results during fiscal year. Planning and 
design and land acquisition are essentially complete. 
Construction continued on recreation facilities and also 
is essentially complete. 
Maintenance: Hired labor forces performed operation 
and maintenance of Carlyle Lake. 
Condition at end of fiscal year. Construction was initiated 
in November 1958. The dam is complete. To date, 
36,696 acres of land have been acquired in fee and 
easements on an additional 25,412 acres. Project is 
essentially complete. 
8B. LAKE SHELBYVILLE 
Location. Dam is on the Kaskaskia River at mile 
221.8, about one-half mile upstream from Shelbyville, 
Ill. Lake will extend northeastward to approximate 
river mile 275 through Shelby, Moultrie, and Coles 
Counties, Ill. (See Decatur sheet of maps of United 
States published by Army Map Service, scale 
1:250,000 and Geological Survey quadrangle maps, 
scale 1:62,500.) 
Existing project. Provides for construction of a compacted 
earthfill dam with a concrete spillway section. 
Spillway structure will consist of an ogee overflow 
section surmounted by three 45- by 37-foot tainter 
gates. Dam will be about 108 feet above streambed and 
about 3,000 feet long. Relocations or alterations are 
required to railroads, highways, and miscellaneous 
utilities. Maximum storage capacity will be 684,000 
acre-feet. Total project cost (1970) is $59,200,000, of 
which $12,290,000 is for lands and damages. Local 
contribution toward cost of project is $16,400,000. 
Local cooperation. Local interests must contribute 
toward cost of this project 7.06 percent of total cost for 
water-supply benefits provided, 6.86 percent of total 
cost for land enhancement, and 9.65 percent of total 
cost plus 5.75 percent of total cost of Carlyle Lake for 
recreation, fish and wildlife benefits. A contract was 
entered into between State of Illinois and the United 
States under which the State will act as local sponsor to 
make contributions for this project. State of Illinois is 
currently making payments thereunder. 
Operations and results during fiscal year. Planning and 
design and land acquisition continued. Construction 
was continued on relocations of roads, railroads, and 
utilities, reservoir clearing, main dam, and recreation 
facilities. 
Maintenance: Hired labor forces performed operation 
and maintenance of Lake Shelbyville. 
Condition at end of fiscal year. Project is 78 percent 
complete. Lands acquired to date are 34,305 acres in 
fee and 6,045 acres in easements. 
8C. VILLAGE OF NEW ATHENS, ILL. 
Location. New Athens is in St. Clair County, Ill., on 
Kaskaskia River at mile 41. 
Existing project. Provides for construction of 6,875 feet 
of earth levee, a pumping station, drainage structures, 
and necessary closure structures and sewer alterations. 
Project cost is $1,928,000. 
Operations and results during fiscal year. Costs incurred 
were for operation and maintenance during construction. 
Condition at end offiscalyear. Project is complete. 
8D. VANDALIA DRAINAGE AND LEVEE 
DISTRICT NO. 21 
Location. The levee district is in Fayette County, 
Illinois on the east bank of the Kaskaskia River, 
between miles 155.5 to 172.0. (See Decatur sheet of 
maps of United States, published by Army Map 
Service, scale 1:250,000.) 
Existing Project. Provides for construction of 20.9 miles 
of earth levee, drainage structures, and necessary 
closure structures, which will afford flood protection to 
approximately 10,100 acres of agricultural land. 
Estimated cost (1970) is $7,310,000. 
Local cooperation. Local interests must provide without 
cost to the United States, all lands, easements, and 
rights-of-way necessary for the construction of the 
project; provide necessary relocations and alterations 
to highways, roads, and bridges; relocate and adjust all 
utilities; and construct necessary drainage ditches. 
Hold and save the United States free from damages 
due to the construction works. Maintain and operate 
all works after completion in accordance with regulations 
prescribed by the Secretary of the Army. 
Operations and results during fiscal year. Preconstruction 
planning continued. 
Condition at end of fiscal year. Construction has not 
commenced. 
8E. DIVELY DRAINAGE AND LEVEE 
DISTRICT NO. 23 
Location. The levee district is in Fayette County, 
Illinois, on the east bank of the Kaskaskia River 
between miles 172.4 and 174.0. (See Decatur sheets of 
maps of United States, published by Army Map 
Service, scale 1:250,000.) 
Existing project. Provides for construction of 3.5 miles 
of earth levee, drainage structures, and necessary 
closure structures, which will afford flood protection to 
approximately 1,100 acres of agricultural land. Estimated 
cost (1970) is $907,000. 
Local cooperation. Local interests must provide, without 
cost to the United States, all lands, easements and 
rights-of-way necessary for construction of the project; 
provide necessary relocations and alterations for 
highways, roads, and bridges; relocate and adjust all 
451

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
utilities and construct necessary drainage ditches; hold 
and save the United States free from damages to the 
construction works; maintain and operate all works 
after completion, in accordance with regulations 
prescribed by the Secretary of the Army. The Board of 
Commissioners of the Dively Drainage and Levee 
District executed preliminary assurances of local 
cooperation on May 25, 1968, which indicates they are 
in favor of the project and will sponsor same upon 
request. 
Operations and results during fiscal year. Preconstruction 
planning continued. 
Condition at end of fiscal year. Construction has not 
commenced. 
9. MERAMEC RIVER BASIN, MO. 
Location. The basin lies within the State of Missouri 
and drains 3,980 square miles. The river is a west bank 
tributary of the Mississippi River at mile 161 above 
mouth of Ohio River. Major streams in the basin 
include the Meramec, Big, and Bourbeuse Rivers. It 
extends about 100 miles southwesterly from St. Louis 
into the Ozark Highlands. (See St. Louis, Mo. and 
Rolla sheets of maps of the United States, published by 
Army Map Service, scale 1:250,000). 
Existing project. Provides for the construction of 
Meramec Park and Union Lakes, authorized by the 
1938 Flood Control Act; and Pine Ford, Irondale, and 
1-38 Lake projects, and 19 angler-use sites, authorized 
by the 1966 Flood Control Act, (PL 89-789). Under the 
plan, Irondale and 1-38 Lakes will reduce flood 
damages in the upper Big and Bourbeuse Rivers. 
Meramec Park, Union, and Pine Ford Lakes will 
substantially reduce flooding in the lower basin area 
and flood crests on the Mississippi River. Project will 
also provide water supply, water quality control, 
recreation, and fish and wildlife conservation. (See 
table 14-C for additional data on this comprehensive 
project.) 
9A. MERAMEC PARK LAKE. 
Location. Dam will be at mile 108.7 on Meramec 
River in Franklin County near Sullivan, Mo. Reservoir 
will be mainly in Crawford, Franklin, and Washington 
Counties, Mo. (See St. Louis, Mo., sheet of maps 
published by Army Map Service, scale 1:250,000.) 
Existing project. Project as authorized by 1938 Flood 
Control Act, provides for construction of an earth dam 
about 167 feet high with a crest length of 3,000 feet. 
Reservoir will provide 1 million acre-feet of storage and 
provide flood protection for 10,950 acres of flood plain 
in the Meramec River valley above the mouth of 
Bourbeuse River, and partial protection for 28,760 
acres of land below the Bourbeuse. Project will also 
provide water supply, water quality control storage and 
recreation, and fish and wildlife benefits. Project cost 
(1970) is $72,500,000, including $8,200,000 local 
reimbursement for water supply. 
Local cooperation. Local interests must contribute 
toward cost of project for storage allocated to water 
supply in accordance with the Water Supply Act of 
1958. State of Missouri, acting through its State Water 
Resources Board and under authority of the General 
Assembly of State of Missouri, executed assurances for 
water supply on August 23, 1967. The assurances were 
reviewed by the Office of the Attorney General, State 
of Missouri, and it is his opinion that the State of 
Missouri has the legal authority and financial capability 
to execute said assurances. These assurances 
have beep approved by the Chief of Engineers. A water 
supply contract will be entered into with the sponsor 
before any use of the water-supply storage provided 
under this contract. 
Operations and results during fiscal year. Engineering and 
design work has been curtailed due to appropriation of 
funds for real estate acquisition only; to date 2,065 
acres have been acquired in fee and easement acquired 
on 1 acre. 
Condition at end of fiscal year. Construction has not 
started. 
9B. UNION LAKE. 
Location. Dam will be on Bourbeuse River at mile 
32.6, about 55 miles west of St. Louis. River is a major 
tributary of the Meramec. Lake will extend about 53 
miles up Bourbeuse River. (See St. Louis, Missouri, 
sheet of maps of the United States, published by Army 
Map Service, scale 1:250,000). 
Existing project. Project as authorized by the 1938 
Flood Control Act, provides for construction of a 
compacted earth fill dam with a concrete chute 
spillway in natural rock upstream of the right 
abutment. Dam will be 152 feet high and 2,000 feet 
long. Construction of new roads, improvement of 
existing roads, and alterations to pipeline, power and 
telephone lines, and construction of recreational 
facilities. Maximum reservoir area will be 16,600 acres 
and maximum storage capacity will be 528,000 acrefeet. 
Project cost (1970) is $43,000,000, of which 
$4,200,000 is a local reimbursement for water supply. 
Local cooperation. Local interests must contribute 
towards cost of project for storage allocated to water 
supply in accordance with the Water Supply Act of 
1958. The State of Missouri demonstrated sufficient 
interest and approval of the basin plan to warrant the 
assumption at this time that necessary local cooperation 
will be forthcoming. 
Operations and results during fiscal year. Preconstruction 
planning continued. 
Condition at end of fiscal year. Construction has not 
started. 
452

ST. LOUIS, MO., DISTRICT 
10. MISSISSIPPI RIVER AT ST. LOUIS, 
MO. 
Location. Protective works will be on right bank of 
Mississippi River from Maline Creek to Carr Street, 
between miles 187.2 and 180.2; from Poplar Street to 
Chippewa Street, between miles 179.2 and 176.3. Area 
to be protected includes low-lying lands along riverfront 
of St. Louis between river and higher ground. 
(See Corps of Engineers, Navigation Charts, Middle 
and Upper Mississippi River, Cairo, Ill., to Minneapolis, 
Minn.) 
Existing project. Provides for construction of 21,200 
feet of earth levee, 34,400 feet of reinforced concrete 
floodwall, closure structures, underseepage relief measures, 
28 pumping stations, and alterations to 44 sewer 
systems. Project will provide protection to heavily 
industrialized area along riverfront from Maline Creek 
to Carr Street and Poplar Street to Chippewa Street 
against a flood of about 200-year frequency. Estimated 
total construction cost (1970) is $78,340,000 including 
$1,600,000 contributed funds. 
Local cooperation. Formal assurances as required by 
authorizing act were received from City of St. Louis. 
These assurances are applicable to reaches 3 and 4 of 
project and supplemented by assurances of Metropolitan 
St. Louis Sewer District. Assurances by Sewer 
District are applicable to maintenance and operation 
of sewage, drainage, and pumping facilities constructed 
as part of project and to local cooperation requirement 
that new drainage and sewerage facilities constructed 
within limits of protected flood plains will function all 
river stages up to design flood, without cost to the 
United States. Included in local cooperation requirements 
is a required contribution equal to. 3.6 
percent of first cost of construction of reach 3. 
Assurances were accepted by the District Engineer, 
October 22, 1958. City furnished rights-of-way required 
for all work currently under contract and 
indicated they will be able to fulfill requirements for 
remaining work as required. Through June 30, 1970, 
city contributed $1,574,474 toward construction cost of 
reach 3. Flood protection for area B along Maline 
Creek in City of Bellefontaine Neighbors was studied 
and approved as part of the project by Chief of 
Engineers on September 29, 1961. Due to lack of 
financial ability of local interests in this reach, the cost 
of providing protection to this area was deleted from 
project cost. 
Operations and results during fiscal year. Planning and 
design continued. Construction continued on levees, 
floodwalls, and pumping plants. 
Condition at end of fiscal year. Construction of Reach 3 
was initiated in March 1959 and Reach 4 in August of 
1963. Reach 3 is 98 percent complete; Reach 4 is 82 
percent complete; total project is 91 percent complete. 
11. PRAIRE DU PONT LEVEE AND 
SANITARY DISTRICT, ILL. 
Location. On left bank of Mississippi River between 
miles 166 and 175 above the mouth of Ohio River. (See 
St. Louis, Mo., map published by Army Map Service, 
scale 1:250,000.) 
Previous project. For details see page 719 of Annual 
Report for 1962. 
Existing project. Project area contains about 12,900 
acres of potential industrial area protected from major 
floods of the Mississippi River by levees built to 
approved grade. However, when Mississippi River 
stage exceeds 15 feet on St. Louis, Mo., gage, 
substantial damage results from impoundment of 
runoff within the district. Project provides for construction 
of four pumping stations to reduce interior 
flooding. 
Local cooperation. Terms have been fully complied 
with. 
Operations and results during fiscal year. Construction of 
pumping plants was completed. 
Condition at end offiscalyear. Project is complete. 
12. REND LAKE RESERVOIR, BIG 
MUDDY RIVER, ILL. 
Location. In Franklin and Jefferson Counties in 
southern Illinois. The damsite will be on Big Muddy 
River, 103.7 miles upstream from its confluence with 
the Mississippi River, and about 3 miles northwest of 
Benton, Ill. (See Belleville sheet of maps of United 
States published by Army Map Service, scale 
1:250,000, and Geological Survey quadrangle maps, 
1:62,500.) 
Existing project. Provides for construction of an earth 
dam, ungated concrete spillway, relocation of roads 
and utilities, recreational facilities, access roads, and 
service facilities. In addition, two subimpoundment 
dams were constructed on upper arms of reservoir to 
enhance fish and wildlife value of project. Reservoir 
will have an area of 24,800 acres, and a storage 
capacity of 294,000 acre-feet. Project will provide flood 
control, water supply, low-flow regulation, conservation 
of fish and wildlife, recreation, and area 
redevelopment. Project cost (1970) is $53,900,000, of 
which $9,900,000 is local contribution for water supply. 
Cost of construction is $39,840,000 and $14,060,000 for 
lands and damages. 
Local cooperation. Agreement was reached among 
State of Illinois, Rend Lake Conservancy District, and 
the Corps that: (1) State of Illinois and Rend Lake 
Conservancy District will jointly and severally sponsor 
this project, (2) State of Illinois entered into a contract 
with the Corps to pay $9,900,000 for water supply 
features of the project, and (3) State of Illinois and 
Rend Lake Conservancy District have entered into 
contract by which the Conservancy District will be 
granted authority to distribute water from the water 
453

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
supply storage in this project. Legislation to implement 
the above agreements was passed by the Illinois 
General Assembly and approved by the Governor. 
Assurances of local cooperation and water supply 
contract have been executed and approved by the 
Secretary of the Army. 
Operations and results during fiscal year. Planning and 
design and land acquisition continued. Construction 
was continued on reservoir clearing, road and utility 
relocations and on main dam. Railroad relocations 
were initiated. 
Maintenance. Hired labor forces performed operation 
and maintenance of Rend Lake Reservoir. 
Condition at end of fiscal year. Project is 47 percent 
complete. Lands acquired to date are 38,048 acres in 
fee and 380 acres in easements. 
13. UPPER MISSISSIPPI RIVER BASIN 
(ST. LOUIS DIST.) 
Location. Mississippi River Basin above Ohio River, 
exclusive of Missouri River Basin, in St. Louis District. 
(See Geological Survey State maps for Illinois and 
Missouri and quadrangle maps; also, St. Louis, 
Quincy, Rolla, and Paducah sheets of maps of the 
United States, published by Army Map Service, scale 
1:250,000.) 
Existing project. Flood Control Act of 1938 approved 
general comprehensive plan for flood control and other 
purposes in upper Mississippi River Basin described in 
Flood Control Committee Document 1, 75th Congress, 
1st session, with such modifications thereof as in 
discretion of Secretary of War and Chief of Engineers 
may be advisable. Individual projects in St. Louis 
District considered in comprehensive plan are listed in 
table 14-D. 
Operations and results during fiscal year. See individual 
reports for details of projects. 
Condition at end of fiscal year. Total cost to date for St. 
Louis District projects under this authorization is 
$22,943,938. 
13A. WOOD RIVER DRAINAGE AND 
LEVEE DISTRICT, ILL. 
Location. In Madison County, Ill., on left bank of 
Mississippi River between river miles 195 and 203 
above Ohio River. District includes bottom lands 
between river and bluffs and extends from Cahokia 
diversion channel on the south to opposite lock and 
dam No. 26 at Alton, Ill., on the north. Small industrial 
cities of Hartford, Wood River, Roxana, and East 
Alton and part of Alton riverfront, lie within the 
district. (See Corps of Engineers Navigation Charts, 
Middle and Upper Mississippi River, Cairo, Ill., to 
Minneapolis, Minn.) 
Previous project. For details see Annual Report for 
1968. 
Existing project. Project area contains about 13,700 
acres protected from major floods of the Mississippi 
River by levees. However, when Mississippi River stage 
exceeds 30 feet on the St. Louis, Mo. gage, substantial 
damage results from impoundment of precipitation 
which falls on the area, runoff from adjacent hill land, 
and seepage from the Mississippi River. The 1965 
Flood Control Act provides for a pumping station with 
collector ditches and necessary appurtenant facilities 
for removal of water impounded by existing levee. 
Estimated cost (1970) is $391,000. 
Local cooperation. Local interests must provide lands, 
easements, and rights-of-way for construction; hold the 
United States free from damages due to the construction 
works; maintain and operate all the works 
after completion in accordance with regulations 
prescribed by the Secretary of the Army; and prevent 
encroachment on improved channels or ponding areas 
and, if ponding areas and capacities are impaired 
provide substitute storage or equivalent pumping 
capacity promptly without cost to the United States. 
Operations and results during fiscal year. Preconstruction 
planning continued. 
Condition at end of fiscal year. Construction has not 
started. 
14. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Mississippi, Illinois, and Kaskaskia Rivers levees 
were inspected in the fall of 1969 and spring of 1970 at a 
cost of $26,814. Inspection of completed work was 
accomplished at a cost of $7,660. Other expenditures 
were $1,294 for piezometer inspection, $23,525 for 
investigation of relief wells, and $5,668 for supervision 
and administration; total cost was $64,961. 
15. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See table 14-F at end of chapter.) 
16. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency flood control activities-repairf, lood fighting, and 
rescue work (Public Law 99, 84th Congress, and antecedent 
legislation). 
Federal costs for fiscal year were $41,745 for advance 
preparations, $327,347 for emergency operations, and 
$244,557 for rehabilitation, a total of $613,649. 
Flood control activities pursuant to Sec. 205 (Public Law 
858, 80th Congress, as amended, preauthorization). 
Federal cost for fiscal year for reconnaissance report 
on Carbondale, Illinois, in connection with urban 
renewal, was $899. 
454

ST. LOUIS, MO., DISTRICT 
MULTIPLE-PURPOSE PROJECT INCLUDING 
POWER 
17. CLARENCE CANNON DAM AND 
RESERVOIR, SALT RIVER, MO. 
Location. Salt River rises in Schuyler County, about 
12 miles south of Missouri-Iowa State line. It flows 
southeasterly about 192 miles and empties into 
Mississippi River about 2 miles above Louisiana, Mo., 
or about 284 miles above mouth of Ohio River. (See 
Kansas City and Quincy sheets of maps of United 
States published by Army Map Service, scale 
1:500,000 and Geological Survey quadrangle maps, 
1:250,000.) 
Previous project. For details see page 645 of Annual 
Report for 1963. 
Existing project. Provides for construction of a multiple-
purpose reservoir, including power, flood control, 
water supply, navigation storage, pollution abatement, 
fish and wildlife conservation and recreation. Dam 
consists of a compacted earth embankment with a 
concrete spillway controlled by tainter gates. Dam and 
spillway are about 1,700 feet long. Spillway structure 
consists of an ogee overflow section surmounted by four 
50-by 39-foot tainter gates. Reservoir will have a 
storage capacity of 1,428,000 acre-feet for use of flood 
control, future domestic and industrial water supply, 
sediment storage, and power generation. Project 
document plan provides for installation of two 27,000 
kilowatt units, one conventional and one reversible, to 
be used for pumped storage operations. Project cost 
estimate including $3,800,000 for local contribution for 
water supply is $96,500,000 (1970). This estimate 
includes $12,064,000 for lands and land acquisition 
costs. 
Local cooperation. In accordance with provisions of 
Water Supply Act of 1958, the cost of storage allocated 
to water supply would be reimbursed by the local 
sponsor. State of Missouri, acting through its State 
Water Resources Board and under authority of the 
General Assembly of State of Missouri by legislation 
passed in 1965, will sponsor this project. This legislation 
provides that the Water Resources Board is 
authorized to make reasonable assurances and enter 
into contracts with appropriate Federal departments 
for purposes of discharging non-Federal responsibilities 
relating to municipal and industrial water supply 
storage as permitted by applicable Federal legislation 
on water resources projects. Assurances were executed 
by State Board April 8, 1965. Assurances reviewed by 
Office of the Attorney General, State of Missouri, and 
it is his opinion that the State of Missouri has the legal 
authority and financial capability to execute said 
assurances. These assurances have been approved by 
Chief of Engineers. A water supply contract will be 
entered into with the sponsor before any use of the 
water supply storage provided under this project. No 
local contribution for recreation, including recreation 
aspects of fish and wildlife, is required. 
Operations and results during fiscal year. Planning and 
design and land acquisition continued. Contract work 
on turbines and initiation of new construction work has 
been suspended until a reappraisal is made to 
determine the present marketability of power. 
Condition at end of fiscal year. Project is 10 percent 
complete. Lands acquired to date are 17,592 acres in fee 
and 1,987 acres in easements. 
GENERAL INVESTIGATIONS 
18. SURVEYS 
Fiscal year costs were $173,162 for three navigation 
studies, $215,143 for ten flood control studies, and $148 
for two comprehensive basin studies. 
19. COLLECTION AND STUDY OF BASIC 
DATA 
Flood plain information studies as authorized by 
Section 206, 1960 Flood Control Act, as amended, 
comprise compilation and dissemination, upon the 
request of a State or a political subdivision thereof, of 
information on floods and flood damages, including 
identification of areas subject to inundation by floods of 
various magnitudes and frequencies, and general 
criteria for guidance of Federal and non-Federal 
interests and agencies in the use of flood plain areas; 
and provide advice to other Federal agencies and local 
interests for their use in planning to reduce the flood 
hazard. Fiscal year costs of $130,442 for flood plain 
management services are set forth in table 14-G at end 
of chapter. (See also table 14-H on completed flood 
plain information reports. 
20. RESEARCH AND DEVELOPMENT 
Fiscal year costs for hydrologic studies were $8,148, of 
which $1,667 was for storm studies and $6,481 for 
sedimentation. 
455

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 14-A 
See 
Section 
in Text Project 
2. Kaskaskia River, 
Ill. (Regular Funds) 
(Contrib. Funds) 
4. Mississippi River 
between Ohio and 
Missouri Rivers 
6. East St. Louis and 
vicinity, Ill. 
7. Harrisonville & 
Ivy Landing D&LD 
No. 2, Il. 
8A. Carlyle Lake, 11. 
(Regular Funds) 
(Contrib. Funds) 
8B. Lake Shelbyville, 
Ill. (Regular Funds) 
(Contrib. Funds) 
8C. Village of New 
Athens, Ill. 
8D. Vandalia Drainage & 
Levee District No. 
21, 111. 
8E. Dively Drainage & 
Levee District No. 
23, Im. 
9A. Meramec Park Lake, 
Mo. 
9B. Union Lake, Mo. 
Funding 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Ne w Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
2,267,000 4,271,000 10,415,000 6,764,000 
1,626,503 3,647,685 9,060,195 23,008,603 
- - - 61,804 
1,456,000 1,054,800 1,070,000 1,000,000 
1,800,085 1,272,098 1,010,171 1,070,046 
4,252,600 3,921,500 2,638,000 3,796,800 
4,007,611 3,145,370 3,548,891 3,675,090 
- -73,000 92,0004 187,000 
1,195,241 107,660 70,371 51,309 
50,000 
25,709 
2,331,000 
2,443,869 
173,300 
170,227 
148,301 
500,193 
14,939 
14,939 
6,564,000 
6,399,388 
2,262,485 
2,208,163 
1,020,000 
625,780 
100,000 
37,162 
400,000 
360,526 
35,147 
-242,000 
585,933 
297,000 
289,949 
27,083 
282,894 
25,601 
25,601 
6,760,000 
7,110,975 
4,815,009 
4,024,791 
241,000 
831,270 
145,000 
201,093 
46,000 
18,411 
370,000 
403,646 
109,000 
63,606 
4,000 
9,956 
242,000 
491,012 
427,000 
431,119 
9,337 
28,446 
28,446 
6,525,000 
6,448,576 
75,000 
74,871 
2,259,505 
1,673,510 
-10,000 
21,855 
142,000 
106,725 
29,000 
36,061 
850,000 
645,850 
485,000 
523,151 
65 
56,454 
556,600 
559,366
6 
50,599 
50,599 
3,097,000 
3,380,433 
233,600 
217,121 
1,000,000 
2,426,010 
-2,000 
5,913 
54,000 
62,811 
70,000 
23,734 
700,000 
880,328 
525,000 
524,020 
25,562,000' 
23,008,605 
61,804 
108,920,5002 
108,917,7102 
85,541,5773 
85,341,294 
22,183,8884 
22,024,308s 
100,0006 
100,0006 
38,100,000 
38,091,500 
1,453,900 
1,450,660 
3,246,368 
3,246,368 
119,585 
119,585 
32,808,000 
32,674,269 
308,600 
291,992 
13,691,456 
13,440,689 
1,928,000 
1,927,808 
441,000 
407,791 
145,000 
78,206 
3,320,0007 
3,285,325 
1,302,6388 
1,294,4158 
456

TABLE 14-A (Continued) 
ST. LOUIS, MO., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
10. Mississippi River New Work 
at St. Louis, Mo. Approp. 9 275,000 4,860,000 3,500,000 1,400,000 70,410,000 
(Regular Funds) Cost 9,967,696 4,534,316 2,856,488 1,837,733 69,763,707 
(Contrib. Funds) New Work 
Contrib. 65,554 32,619 10,041 20,259 1,574,474 
Cost 151,285 63,243 2,556 - 1,542,898 
11. Prairideu Pont New Work 
Levee & Sanitary Approp. 120,000 545,200 10,000 - 769,2009 
Dist.I,l l. Cost 31,065 492,407 157,309 8,423 769,200 
12. Rend Lake, Big New Work 
Muddy, Ill. Approp. 3,540,000 4,090,000 5,225,000 7,585,000 25,186,00010 
(Regular Funds) Cost 3,465,266 4,706,074 5,343,974 6,949,054 24,458,97510 
Maint. 
Approp. - - 45,500 73,300 118,800 
Cost - - 45,494 73,288 118,782 
(Contrib. Funds) New Work 
Contrib. - - - - 
Cost 976,528 326,579 1,351,262 2,547,079 5,201,44811 
13A. Wood River Drainage New Work 
& Levee District, Approp. - 20,000 29,000 31,000 80,00012 
Ill. Cost - 15,577 23,533 22,084 61,174 
17. Clarence Cannon Dam New Work 
and Reservoir, Salt Approp. 1,365,000 1,950,000 2,200,000 2,133,000 9,566,62813 
River, Mo. Cost 1,339,145 2,001,951 2,234,047 2,146,472 9,484,53813 
1. Excludes $10,461 expended on previous project. 
2. Excludes previous project cost of $1,416,620. 
3. In addition $3,109 was expended for rehabilitation. 
4. Includes $234,000 for work authorized by Flood Control 
Act of 1965. 
5. Includes $183,490 for work authorized by Flood Control 
Act of 1965. 
6. Excludes $4,363,802 for previous project. 
7. Includes $200,000 for definite project study under 1938 
F.C. Act. 
8. Includes $183,638 for definite project study under 1938 
F.C. Act. 
9. Excludes $5,226,153 for previous project. 
10. Excludes $550,000 Area Redevelopment Administration 
funds allotted to the State of Illinois for increased construction 
costs of Interstate Highway 57 to meet project requirements, 
and excludes $449,093 Area Redevelopment Administration 
Funds allotted to the Corps. 
11. No Appropriation. 
12. Excludes $14,629,821 for previous project and $23,000 
contributed funds. 
13. Includes $216,628 for definite project study under 1938 
F.C. Act. 
457

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Work Authorized Documents 
KASKASKIA RIVER, ILL. (See Section 2 of Text) 
Oct. 23,1962 Construct canal, lock and dam to provide a nine-foot navigation 
channel from mouth to Fayetteville, Illinois. 
MISSISSIPPI RIVER BETWEEN OHIO AND MISSOURI RIVERS (See Section 
4 of Text) 
Project for regulating works adopted in 1881. (To obtain a 
June 3, 1896 minimum depth of 8 feet). 
June 13,1902 
Mar. 2, 19071 
Mar. 3, 19051 
Mar. 2, 19071 
S. Doc. 44, 87th Cong., 1st sess. 
Annual Report, 1881, p. 1536. 
Dredging introduced as part of the project. 
These acts practically abrogated that part of project for 
middle Mississippi which proposed regulating works. 
June 25, 1910 Regulating works restored to project and appropriations begun 
with a view to completion of improvement between Ohio and 
Missouri Rivers within 12 years at an estimated cost of $21 
million, exclusive of amounts previously expended. 
Jan. 21, 1927 For 9 feet deep and 300 feet wide from Ohio River to northern 
boundary of City of St. Louis. 
July 3, 1930 Project between northern boundary of St. Louis and Grafton 
(mouth of Illinois River) modified to provide a channel 9 ft. 
deep and generally 200 feet wide with additional width around 
bends. 
Mar. 2, 1945 Modified to provide construction of a lateral canal with lock 
at Chain of Rocks. 
Sept. 3, 19543 Modified to provide construction of a small-boat harbor 
opposite Chester, Ill. 
July 3, 19584 Modified to provide construction of a fixed crestrockfill dam 
900 feet below Chain of Rocks Bridge. 
EAST ST. LOUIS AND VICINITY, ILL. (See Section 6 of Text) 
June 22, 1936 
Oct. 22, 1965 
Raise and enlarge existing levee. 
Construct pumping plant and other modifications to reduce 
interior flooding. 
HARRISONVILLE AND IVY LANDING DRAINAGE AND LEVEE DISTRICT 
NO. 2, ILL. (See Section 7 of Text) 
Oct. 23, 1962 Construct pumping plants and other modifications to reduce 
interior flooding. 
KASKASKIA RIVER, ILL. (See Section 8 of Text) 
July 3,1958 Deletes Carlyle Reservoir and levees from New Athens to Carlyle 
from Upper Mississippi River Basin Plan and reauthorizes them 
as part of the Kaskaskia River plan. Construct dam at 
Shelbyville and six levee projects between Cowden and 
Vandalia and a local protection project at New Athens. 
Oct. 27, 1965 Deleted requirement that local interests make a cash 
contribution to cost of levees between Cowden and Vandalia. 
Requires that local interests make a cash contribution equal 
to full cost of acquisition of flowage easements in those 
lands acquired by the United States which, upon completion of 
the levee in District No. 22, will not be required for 
construction, operation and maintenance of Carlyle Lake. 
MERAMEC RIVER BASIN, MO. (See Section 9 of Text) 
June 28, 1938 Construct reservoirs and local protection projects. 
Nov. 7, 1966 Construct Pine Ford, Irondale, and 1-38 dams and 19 Angler Use 
sites. 
MISSISSIPPI RIVER AT ST. LOUIS, MO. (See Section 10 of Text) 
Aug. 9, 1955 Construct floodwall and appurtenant structures to afford 
protection to City of St. Louis. 
H. Doc. 50, 61st Cong., 1st sess., 
and H. Doc. 168, 58th Cong., 
2d sess. 
Rivers and Harbors Committee Doc. 
9, 69th Cong., 2d sess. 
Rivers and Harbors Committee Doc. 
12, 70th Cong., 1st sess. 
H. Doc. 231, 76th Cong., 1st sess. 
H. Doc. 230, 83d Cong., 1st sess. 
S. Doc. 7, 85th Cong., 1st sess. 
Special report on record in OCE. 
H. Doc. 329, 88th Cong., 2d sess. 
H. Doc. 542, 87th Cong., 2d sess. 
H. Doc. 232, 85th Cong., Ist sess. 
H. Doc. 351, 88th Cong., 2d sess. 
Flood Control Committee Doc. 1, 
75th Cong., 1st sess. 
H. Doc. 525, 89th Cong., 2d sess. 
S. Doc. 57, 84th Cong., 1st sess. 
458 
TABLE 14-B 
Acts

ST. LOUIS, MO., DISTRICT 
TABLE 14-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
PRAIRIE DU PONT LEVEE AND SANITARY DISTRICT, ILL. (See Section 
11 of Text) 
Oct. 23, 1962 Construct pumping stations to reduce interior flooding. H. Doc. 540, 87th Cong., 2d sess. 
REND LAKE, BIG MUDDY RIVER, ILL. (See Section 12 of Text) 
Oct. 23, 1962 Construct dam at Benton, Ill., and subimpoundment dams on upper H. Doc. 541, 87th Cong., 2d sess. 
arms of reservoir. 
UPPER MISSISSIPPI RIVER BASIN (See Section 13 of Text) 
June 28, 19384 Construct reservoirs and local protection projects. Flood Control Committee, Doc. 1, 
75th Cong., 1st sess. 
WOOD RIVER DRAINAGE AND LEVEE DISTRICT, ILL. (See Section 13A 
of Text) 
Oct. 27, 1965 Construct pumping station to reduce interior flooding. H. Doc. 150, 88th Cong., 1st sess. 
CLARENCE CANNON DAM AND RESERVOIR, SALT RIVER, MO. (See Section 
17 of Text) 
Oct. 23, 1962 Modified act of 28 June 1938 by deleting the reservoir H. Doc. 507, 87th Cong., 2d sess. 
therefrom and reauthorizing it as a separate multiple-purpose 
project. 
Oct. 27, 1965 Changes name of project from Joanna Dam to present designation. Public Law 89-298, 89th Cong. 
1. Also joint resolution, June 29, 1906. 3. Inactive. 
2. Contains latest published map. 4. All work completed. 
TABLE 14-C LAKES, LEVEES, AND RECREATION FACILITIES 
Estimated Total Estimated 
See Section Project Name EstimatedRequiredost (Date of 
in Text Federal Cost Non-Federal Cost (Date of 
Contribution Revision) 
8. Kaskaskia River, Ill. Lakes: 
Carlyle2 $38,730,000 $ 3,291,000 $42,021,000(1970) 
Shelbyville 2 42,800,000 16,400,000 59,200,000(1970) 
Levees: 
Village of New Athens2 ,3 1,928,000 - 1,928,000(1970) 
District No. 21 (Vandalia Dist.)2 7,310,000 - 7,310,000(1970) 
District No. 23 (Dively Dist.)2 907,000 - 907,000(1970) 
Districts No. 22, 27, 28, and 
28A (Cowden to Vandalia)1 3,620,000 - 3,620,000(1963) 
Districts No. 3, 4, 8, 10 and 
13 (Carlyle to New Athens)1 7,567,000 - 7,567,000(1959) 
9. Meramec River Basin, Lakes: 
Mo. Meramec Park 2 64,300,000 8,200,000 72,500,000(1970) 
Union2 38,800,000 4,200,000 43,000,000(1970) 
Pine Ford4 32,460,000 8,840,000 41,100,000(1970) 
Irondale4 18,850,000 2,950,000 20,800,000(1970) 
I-384 8,753,000 747,000 9,500,000(1970) 
Recreation facilities: 
Angler-use sites4 355,000 355,000 710,000(1966) 
1. Inactive 
2. Separate reports are included herein 
3. Project is complete, cost shown is actual. 
4. See 1967 Annual Report for details 
459

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
UPPER MISSISSIPPI RIVER BASIN 
LEVEES 
TABLE 14-D (See Section 13 of text) 
For Last Rull Report Total Cost to Date 
See Annual Report under this 
Projects1 For- authorization 
Mississippi River: 
Wood River Levee Project, Ill. 2,3 1968 $14,629,821 
Stringtown Fort/Chartres and Ivy Landing, Ill. 1957 2,116,872 
Kaskaskia Island Levee Project, Ill. 1949 297,460 
Grand Tower Levee Project, Ill. 1959 4,662,220 
Miller Pond Levee Project, Ill. 1955 164,183 
Illinois River. 
Meredosia Lake and Willow Creek Levee, Ill. 1944 249,738 
1. All work under 1938 basin plan authorization completed 
or superseded by 1962 or 1965 Flood Control Acts. 
2. Excludes $23,000 local contributions 
3. See individual reports herein 
TABLE 14-E OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Total to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Cuivre River, Mo. l 1883 12,000 
Moccasin Springs, Mo. 1969 76,4362 
1. Inactive. River declared nonnavigable by act of.March 23, 
1900. 
2. Excludes $56,605 contributed funds. 
460

ST. LOUIS, MO., DISTRICT 
TABLE 14-F OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Total to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Big Swan Drainage and Levee District, Illinois 
River, 111.1 
Cache River Diversion, Ill. 1953 2,837,114 
Cape Girardeau, Mo., reaches Nos. 1, 3, and 43 1959 22,000 
Cape Girardeau, Mo., No. 2 2 1965 5,157,805 
Chouteau, Nameoki, and Venice Drainage and 
Levee District, 11. 1955 185,700 
Clear Creek Drainage and Levee District, 11.5 1964 4,984,500 
Columbia Drainage and Levee District No. 3, 
Ill. 1969 2,910,8727 
Degognia and Fountain Bluff Levee and Drainage 
District, Ill. 1959 5,874,590 
East Cape Girardeau and Clear Creek Drainage 
District, I.5 1963 1,915,756 
Emergency bank protection for certain highway 
and railroad facilities at Price Landing, Mo. 
(see Flood Control Act of 1944)4 1950 50,000 
Emergency repairs to levees on Mississippi, 
Illinois and Kaskaskia Rivers and flood 
fighting and rescue work (sec. 5, Flood 
Control Act of 1941, as amended)4 1953 - 1,033,279 
Emergency protection for certain highway and 
railroad facilities at Chester, Ill., brid~e 
(sec. 12, Flood Control Act of 1944) 1952 50,000 
Emergency protection for Illinois approach, 
Chain of Rocks Bridge (sec. 12, Flood Control 
Act of 1944)2 1946 25,000 
Fort Chartres and Ivy Landing Drainage District 
No. 5, I11.2 1958 1,150,396 
McGee Creek Drainage and Levee District, Ill.1 1968 217,000 
Mississippi Riv Agr Area #8, Mo. 1967 
Mississippi Riv Agr Area #10, Mo. 1967 - - 
Mississippi Riv Agr Area #12, Mo. 1967 - 
Mississippi River, Alton to Gale, Ill., 
underseepage measures - 85,422 
North Alexander Drainage and Levee District, 111.2 1957 939,569 
Perry County Drainage and Levee Districts Nos. 
1, 2 and 3, Mo. 1968 6,800,700 
Prairie du Rocher and vicinity, 111.2 1959 3,872,502 
Preston Drainage and Levee District, Ill. s 1959 1,866,910 
Richland Creek, Ill. 1969 401,0008 
Ste. Genevieve Levee District No. 1, Mo.3 1949 
St. Louis County Drainage and Levee District, 
Mo.3 1938 - 
Urban areas at Alton, Ill. 3 1960 193,000 
461 
451-584 0-72-30

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 14-F (Continued) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Total to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Valley City D&LD, Ill.2,6 1967 91,952 - 
Weidmer Chemicals Drainage and Levee District, 
Mo.3 1938 
1. Projects authorized or modified by Flood Control Act of 6. Authorized by Chief of Engineers (Sec. 205, 1948 Flood 
Oct. 23, 1962 (See H. Doc. 472, 87th Cong., 2d sess. for details). Control Act, as amended). 
2. Completed. 7. Includes $2,820,919 expended on previous project. 
3. Inactive project. 8. Includes $180 cost for fiscal year 1970. 
4. Work complete, now performed under P.L 99. 
5. Completed except for seepage control measures, which 
are inactive. 
COSTS FOR FLOOD PLAIN MANAGEMENT SERVICES 
TABLE 14-G (See Section 19 of text) 
Studies and Services Fiscal Year Costs 
Flood Plain Information Reports 
Cape Girardeau, Mo. $13,694 
Carbondale, Iii. 39,904 
Centralia, Ill. 59 
Fenton, Mo. 14,956 
Flat River, Mo. 1,649 
Mexico, Mo. 9,998 
Technical Services and Guidance 50,182 
Total $130,442 
COMPLETED FLOOD PLAIN STUDIES 
TABLE 14-H (See Section 19 of text) 
Location Requesting Agency Date Completed Federal Cost 
Mississippi River tributaries Jefferson Co., Mo. Sept. 64 $23,200 
Big River Jefferson Co., Mo. Oct. 65, 9,623 
Meramec River tributaries Jefferson Co., Mo. Oct. 65 10,330 
Belew Creek Jefferson Co., Mo. Jan. 66 5,551 
Saline Creek Jefferson Co., Mo. Sept. 66 6,424 
Dry Creek Jefferson Co., Mo. Jan. 67 8,127 
Heads and Bourne Creeks Jefferson Co., Mo. Jan. 67 6,856 
Pacific, Mo. City of Pacific, Mo. Oct. 68 22,900 
Flat River, Mo. City of Flat River, Mo. July 69 25,982 
Centralia, Ill. City of Centralia, Ill. Feb. 70 31,550 
Cape Girardeau, Mo. City of Cape Girardeau, Mo. June 70 30,320 
462

GALVESTON, TEX., DISTRICT * 
Galveston District comprises drainage basins of all 
short streams arising in coastal plain of Texas and 
flowing into Gulf of Mexico, including entire basins of 
Buffalo Bayou, San Jacinto, San Bernard, Lavaca, 
Navidad, Mission, and Aransas Rivers. It embraces 
Agua Dulce, San Fernando, and Olmos Creek Basins 
draining into Baffin Bay, and coastal area south 
thereof to the Rio Grande and east of western 
Boundary of Starr County, Tex. It includes lower 
basins of major streams flowing into Gulf of Mexico: 
Sabine River, Tex. and La., downstream from U.S. 
Highway 190 crossing at Bon Wier, Tex.; Neches River 
downstream from Town Bluff gaging station; Trinity 
River downstream from Texas State Highway 19 
crossing at Riverside, Tex.; Brazos River downstream 
from confluence with Navasota River; Colorado River 
downstream from gaging station at Austin, Tex.; 
Guadalupe River downstream from confluence with 
San Marcos River; San Antonio River downstream 
from confluence with Escondido Creek; Neuces River 
downstream from confluence with Frio and Atascosa 
Rivers. 
IMPROVEMENTS 
Navigation 
1. Aquatic Plant Control (Southwestern 
Division) ....... ............. .................. 
2. Brazos Island Harbor, Tex. ................... 
3. Cedar Bayou, Tex .............................. 
4. Clear Creek and Clear Lake, Tex. ....... 
5. Corpus Christi Ship Channel, Tex....... 
6. Double Bayou, Tex ................................ 
7. Freeport Harbor, Tex ............................. 
8. Galveston Harbor and Channel, Tex... 
9. Gulf Intracoastal Waterway Between 
A palachee Bay, Fla., and the 
M exican Border .... .......................... 
10. Houston Ship Channel, Tex ............. 
11. Matagorda Ship Channel, Tex.............. 
12. Sabine-Neches Waterway, Tex. ......... 
13. Texas City Channel, Tex. ..................... 
14. Trinity River and Tributaries, Tex. ..... 
14A. Anahuac Channel, Tex ......................... 
14B. Channel to Liberty, Tex ....................... 
14C. Wallisville Lake, Tex ............................. 
15. Other Authorized Navigation Projects .. 
16. Navigation Work under special 
authorization .................................. 
Page 
463 
464 
464 
465 
465 
466 
466 
466 
467 
469 
469 
470 
470 
471 
471 
471 
472 
472 
Flood Control Page 
17. Buffalo Bayou and Tributaries, Tex. .... 473 
18. Freeport and Vicinity, Tex. Hurricane- 
Flood Protection .................................. 473 
19. Highland Bayou, Tex. .......................... 474 
20. Liberty Local Protection Project, Tex. . 474 
21. Port Arthur and Vicinity, Tex., 
Hurricane-Flood Protection ................. 474 
22. Taylors Bayou, Tex. .............................. 475 
23. Texas City and Vic., Tex., Hurricane- 
Flood Protection ................................. 475 
24. Vince and Little Vince Bayous, Tex... 475 
25. Inspections of Completed Flood Control 
W ork ......................... ................... ... 476 
26. Other Authorized Flood Control 
Projects ........................................ 476 
27. Flood Control Work under special 
authorization ....................................... . 476 
28. 
29. 
472 30. 
General Investigations 
Surveys ............................................... 476 
Collection and Study of Basic Data ..... 476 
Research and development .................. 476 
NAVIGATION 
1. AQUATIC PLANT CONTROL 
(SOUTHWESTERN DIVISION) 1965 
ACT 
Location. Navigable waters, tributary streams, connecting 
channels, and other allied waters in Texas and 
the Sabine River Watershed of Louisiana. 
Previous projects. For details see page 699 of Annual 
Report for 1963. 
Existing project. A comprehensive project to provide 
for control and progressive eradication of water-hyacinth, 
alligatorweed, Erasian watermilfoil, and other 
obnoxious aquatic plant growths, from navigable 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
463

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
waters, tributary streams, connecting channels, and 
other allied waters in Texas and the Sabine River 
Watershed of Louisiana, in the combined interest of 
navigation, flood control, drainage, agriculture, fish 
and wildlife conservation, public health, and related 
purposes, including continued research for development 
of the most effective and economic control 
measures. (See Table 15-C Other Authorized Navigation 
Projects paragraph for completed project 
authorized by 1958 and 1962 River and Harbor Acts). 
(Also see Table 15-B for authorizing legislation). 
Estimated cost for new work is: Federal (Corps) 
$470,000 and non-Federal $182,000. 
Local cooperation. Sec. 302, 1965 River and Harbor 
Act, applies. Non-Federal work contribution estimated 
at $182,000. 
Operations and results during fiscal year. On Nueces River 
Basin, 4,000 acres were sprayed under contract with 
State of Texas. Reimbursement to State for Government's 
share of cost of work is being withheld 
pending completion of audit. Work on the design 
memorandum and inspection of work was continued at 
a cost of $17,601. 
Condition at end offiscalyear. Spraying of aquatic plants 
in the Nueces River Basin was initiated and work on 
the design memorandum was continued. (See Table 
15-E for total cost of the existing project to June 30, 
1970.) 
2. BRAZOS ISLAND HARBOR, TEX. 
Location. At extreme south end of coast of Texas, 
about 7 miles north of mouth of Rio Grande and about 
5 miles east of Brownsville, Tex. (See Coast and 
Geodetic Survey Chart 1288). 
Previous project. For details see page 1017 of Annual 
Report for 1932. 
Existing project. Provides for channel dimensions in 
various sections of the waterway shown in the tabulation 
at end of chapter; for dual jetties at the gulf 
entrance, a north jetty 6,330 feet long and a south jetty 
5,092 feet long, and a 1,000-foot extension to existing 
north jetty and for maintenance of 3rd fishing harbor 
constructed by local interests. Under ordinary conditions, 
mean tidal range is about 1.5 feet, and extreme 
range is about 2 feet. All depths refer to mean low tide. 
To some extent, height of tides is dependent on the 
wind, and during strong "northers" in winter season, 
water surface in southern end of Laguna Madre may 
be raised 4 feet or more above mean low tide in the gulf. 
Estimated cost for new work is $17,873,000 Federal 
(Corps), excluding expenditures on previous projects, 
and non-Federal $2,071,000 including $1,683,258 
contributed and $387,742 lands. (See Table 15-B and 
15-F for authorizing legislation and channel dimensions.) 
Local cooperation. Complied with except as required by 
section 101, 1960 River and Harbor Act. Non-Federal 
contributions, $1,683,258. 
Terminal facilities. A grain elevator and covered plant 
for bulk cargo constructed by Brownsville Navigation 
District. Two privately owned marine ways for boat 
repairs constructed in the fishing harbor. An additional 
basin in fishing harbor has been constructed by local 
interests. Docks around the additional basin have been 
constructed by local interests. (See Port Series No. 26, 
revised 1969, for additional facilities). Facilities are 
adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Engineering and design and supervision and administration 
cost $117 and $16. 
Maintenance: Engineering and design and supervision 
and administration cost $7,245 and $39,590. 
Condition and operation studies, inspections and 
reports, real estate activities, and project condition 
surveys cost $12,483. Waterway directional and information 
signs and hired labor operations related to 
channel work totaled $632. (See table 15-H for 
dredging operations.) 
Condition at end of fiscal year. Existing project is about 
60 percent complete. Work remaining consists of 
widening Brownsville Channel from Goose Island to 
Brownsville turning basin, deepening southeast corner 
of Brownsville turning basin to 36 feet, and extending 
north jetty 1,000 feet. (See table 15-E for total cost of 
existing project to June 30, 1970.) 
3. CEDAR BAYOU, TEX. 
Location. The bayou is about 30 miles long. It flows to 
the south and empties into northwest corner of upper 
Galveston Bay, about 1.5 miles below mouth of San 
Jacinto River and about 28.5 miles north of Galveston, 
Tex. (See Coast and Geodetic Survey Chart 1282.) 
Previous project. For details see Annual Report for 
1938. 
Existing project. (See Table 15-F for existing project 
dimensions provided for in this waterway.) 
Project also includes jetties at mouth of bayou 
provided for under previous project. Under ordinary 
conditions mean tidal range is about 0.6 foot and 
extreme range 1.2 feet. Height of tides is dependent 
largely on the wind, and during strong "northers" in 
winter season, water surface may be depressed 2 feet 
below mean low tide. Channel from first bend above 
mouth to a point 11 miles above mouth is deferred for 
restudy. (See Table 15-B for authorizing legislation.) 
Local cooperation. Fully complied with except for the 
deferred for restudy portion. 
Terminal facilities. U. S. Steel Company has'a barge 
dock at bayou mile 2.8, and there are a few small 
464

GALVESTON, TEX., DISTRICT 
wharves, privately owned, for local use at various 
places along Cedar Bayou. Facilities are considered 
adequate for existing commerce. 
Operation and results during fiscalyear. 
Maintenance: Engineering and design and supervision 
and administration cost $2,822 and $5,128. 
Condition and operation studies, inspections and 
reports, real estate activities and project condition 
surveys cost $1,644. Reference line piles were installed. 
(See Table 15-H for dredging operations.) 
Condition at end of fiscal year. Existing project is 
complete except for portion deferred for restudy. 
Channel was complete to project dimensions from 
Houston Ship Channel to first bend in Cedar Bayou 
above the mouth in 1931. (See Table 15-E total cost of 
existing project to June 30, 1970.) 
4. CLEAR CREEK AND CLEAR LAKE, 
TEX. 
Location. Clear Creek has its source about 13 miles 
south of Houston, Tex., and flows southeast for about 
25 miles, emptying into west side of upper Galveston 
Bay at a point 24 miles northwest of Galveston, Tex. 
(See Coast and Geodetic Survey Chart 1282.) 
Existing project. (See Table 15-F for existing project 
dimensions provided for in this waterway.) 
Under ordinary conditions mean tidal range is about 
0.8 foot and extreme range is 1.4 feet. Height of tides is 
dependent largely on the wind and during strong 
"northers" in winter season, water surface may be 
depressed 2 feet below mean low tide. (See Table 15-B 
for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Consist of small privately owned 
wharves, several ship repair yards and marinas which 
accommodate light commercial vessels and pleasure 
yachts. These are along lake shore and at towns of 
Seabrook and Kemah at mouth of creek. A commercial 
shell loading dock is located near League City at the 
head of the project. 
Operations and results during fiscal year. Maintenance: 
Engineering and design and supervision and administration 
cost $1,536 and $1,197. Condition and 
operation studies, inspections and reports, real estate 
activities and project condition surveys cost $2,257. 
Waterway information signs cost $288. 
Condition at end of fiscal year. Project was completed 
June 1950. 
5. CORPUS CHRISTI SHIP CHANNEL, 
TEX. 
Location. This project, formerly known as the Port 
Aransas-Corpus Christi Waterway, Tex., was changed 
to Corpus Christi Ship Channel, Tex. by 1968 River 
and Harbor Act. This is a consolidation of old 
improvements of Port Aransas, Tex., and channel from 
Aransas Pass to Corpus Christi, Tex. Aransas Pass is on 
southern portion of Texas Coast, 180 miles southwest of 
Galveston and 132 miles north of mouth of Rio 
Grande. Aransas Pass connects Corpus Christi Bay and 
Aransas Bay with the gulf. Waterway extends from 
deep water in the gulf through Aransas Pass jettied 
entrance, thence westerly 20.75 miles to and including 
a turning basin at Corpus Christi, thence westerly 1.75 
miles through Industrial Canal to and including 
turning basin at Avery Point, thence westerly 4.25 
miles to and including a turning basin near Tule Lake, 
thence northwesterly 1.8 miles to and including a 
turning basin at Viola, Tex. (See Coast and Geodetic 
Survey Charts 523, 892, 893, 1285 and 1286.) 
Previous Project. For details see page 1861 of Annual 
Report for 1915. 
Existing project. (See Table 15-F for existing project 
dimensions provided for in various channels and basins 
comprising this waterway.) 
Project also provides for two rubblestone jetties at 
Aransas Pass entrance, extending into the gulf from St. 
Joseph and Mustang Islands, project lengths of which 
are 11,190 and 8,610 feet, respectively. Project further 
provides for a stone dike on St. Joseph Island about 
20,991 feet long, connecting with north jetty and 
extending up this island to prevent a channel being cut 
around jetty. Under ordinary conditions, mean tidal 
range at Aransas Pass is about 1.1 feet and extreme 
range about 2 feet, and at Corpus Christi mean range 
about 1 foot and extreme about 1.5 feet. Heights of 
tides are dependent largely on strength and directions 
of winds, and during strong "northers" in the winter 
season water surface may be depressed as much as 3 
feet below mean low tide. Estimated cost for new work 
is: Federal (Corps) $39,268,000, exclusive of amount 
expended on previous projects; and non-Federal 
$9,247,300, including $3,118,072 contributed funds 
and value of useful work performed, $1,289,228 lands, 
$2,855,000 relocations and $1,985,000 other costs. (See 
Table 15-B for authorizing legislation.) 
Local cooperation. Fully complied with except for 
provisions of Sec. 101 of 1968 River and Harbor Act. 
Non-Federal contributions estimated at $3,118,072. 
Terminal facilities. Terminal facilities on Harbor 
Island at head of Aransas Pass, Ingleside, Corpus 
Christi, La Quinta, Avery Point, and Viola, are 
considered adequate for existing commerce. (See Port 
Series, No. 25, revised 1968, Corps of Engineers.) 
Operations and results during fiscal year. Maintenance: 
Engineering and design and supervision and administration 
cost $9,025 and $43,341. Condition and 
465

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
operation studies, inspections and reports, real estate 
activities and project condition surveys cost $18,796. 
Waterway directional and information signs, and hired 
labor operations related to channel work totaled $463. 
Survey tables were constructed by contract at a cost of 
$5,798. (See Table 15-H for dredging operations.) 
Condition at end of fiscal year. The project is about 49% 
complete exclusive of inactive portions. The work 
remaining consists of deepening entrance channel to 47 
feet; deepening all other deep-draft channels to 45 feet; 
widening of channels and basins; constructing a 
turning point on main channel at junction with La 
Quinta channel and constructing a mooring area at 
Port Ingleside with dolphins. (See Table 15-E for total 
cost of existing project to June 30, 1970.) 
6. DOUBLE BAYOU, TEX.- 
Location. Enters upper Galveston Bay on the east side 
about 30 miles north of Galveston and about 8.25 miles 
south of Anahuac. (See Coast and Geodetic Survey 
Chart 1282.) 
Existing project. Existing Project dimensions for 
waterway are shown in Table 15-F at end of chapter. 
(Also see Table 15-B authorizing legislation.) Under 
ordinary conditions mean tidal range is about 0.5 foot 
and extreme range is about 1.2 feet. Height of tides is 
dependent largely on winds, and during strong north 
winds in the winter season, water surface may be 
depressed 1.5 feet below mean low tide. Latest 
published map is in Detailed Project Report for 7-foot 
project. Estimated cost for new work is $161,000 
Federal (Corps) and non-Federal $67,000, consisting of 
lands and damages $57,000, and relocations $10,000. 
Local cooperation. Fully complied with. 
Terminal facilities. Facilities are privately owned. At 
the mouth of the bayou is a timber wharf for loading oil 
barges. Between miles 1 and 1.5 above the mouth are a 
timber wharf, a boat slip, and a marine railway owned 
by the Brown and Root Corp. At mile 3 above the 
mouth is a shell depot for handling oystershell. The 
facility consists of a timber bulkhead and hoppers for 
loading trucks. One half mile above the mouth are 
several fishing vessel docks. 
Operations and results during fiscal year. New work: 
Engineering and design and supervision and administration 
cost $1,053 and $163. 
Maintenance: Engineering and design and supervision 
and administration cost $462 and $122. 
Condition and operation studies, inspections and 
reports, real estate activities, and project condition 
surveys cost $2,272. 
Condition at end of fiscal year. The 6-foot project was 
completed in 1941. Preconstruction planning on the 7- 
foot project is complete. 
7. FREEPORT HARBOR, TEX. 
Location. Formed by improvement of Brazos River, 
Tex., from mouth to about 6 miles upstream to 
Freeport, Tex. (See Coast and Geodetic Survey Charts 
887 and 1283). 
Previous projects. For details see page 1860 of Annual 
Report for 1915. 
Existing project. Existing project dimensions for 
various channels and basins are shown in Table 15-F 
on channel dimensions at end of chapter. (See also 
Table 15-B authorizing legislation.) 
Existing project also provides for: Ajettied entrance 
consisting of two parallel, rubblemound jetties 560 feet 
apart with lengths of 4,708 feet (northeast jetty) and 
5,018 feet (southwest jetty); a diversion dam in Brazos 
River about 7.5 miles above original mouth of river; for 
a river diversion channel from dam to a new outlet to 
gulf about 6.5 miles southwest of original mouth; and 
for necessary auxiliary works together with a navigation 
lock in diversion dam. Jetties, diversion dam, 
and diversion channel are complete. The 30-foot 
project in the channel from Upper Turning Basin to 
Stauffer Chemical Plant, including the turning basin, 
and lock in diversion dam are in the inactive category. 
Under ordinary conditions mean tidal range is about 
1.5 feet and extreme range about 2.5 feet. Except under 
extreme conditions, rises on river and in diversion 
channel do not cause greater variations in water 
surface than those caused by tidal action. 
Local cooperation. Fully complied with except for 
inactive portions. 
Terminal facilities. Small privately owned wharves, 
two oil docks, one acid dock, two shell unloading docks 
and one caustic dock. Brazos River Navigation District 
has one large dock with four transit sheds over rail 
facilities permitting all-weather work. Facilities considered 
adequate for existing commerce. (See Port 
Series No. 26, revised 1969, for additional facilities.) 
Operations and results during fiscal year. Maintenance: 
Engineering and design and supervision and administration 
cost $4,610 and $57,254. Condition and 
operation studies, inspections and reports, real estate 
activities and project condition surveys cost $8,072. 
(See Table 15-H for dredging operations.) 
Condition at end of fiscal year. Existing project is 
complete exclusive of inactive portion. (See Table 15-E 
for total cost of existing project to June 30,1970.) 
8. GALVESTON HARBOR AND 
CHANNEL, TEX. 
Location. A consolidation of authorized improvements 
at Galveston, Tex., which includes projects 
formerly identified as Galveston Harbor, Tex.; Galveston 
Channel, Tex.; and Galveston seawall extension. 
Entrance to Galveston Harbor is on gulf of 
Mexico, on the northern portion of Texas coast. 
Galveston Channel extends from a point in Galveston 
466

GALVESTON, TEX., DISTRICT 
Harbor between Bolivar Peninsula and Fort Point to 
and along wharf front of Galveston, Tex., and is about 
5 miles long and 1,200 feet wide. (See Coast and 
Geodetic Survey Chart 520.) 
Previous projects. For details see page 1854 of Annual 
Report for 1915. 
Existing project. Provides for channel dimensions in 
sections of the waterway shown in Table 15-F. (Also see 
Table 15-B for authorizing legislation.) 
Also provided are: two rubble-mound jetties, the 
south one extending from Galveston Island and the 
north one extending from Bolivar Peninsula, for 
distances of 35,900 feet and 25,907 feet, respectively, 
into the Gulf of Mexico; a concrete seawall from the 
angle at Sixth Street and Broadway, in the city of 
Galveston, to the south jetty, and a 16,300-foot 
extension of the concrete seawall in a southwesterly 
direction from 61st Street; for 11 groins along the gulf 
shore between 12th Street and 61st Street; and for 
maintenance of seawall from the angle at 6th Street 
and Broadway to the south jetty. Under ordinary 
conditions, mean tidal range in Galveston harbor is 1.6 
feet on outer bar and 1.4 feet on inner bar with extreme 
ranges of 2.3 and 2.1 feet, respectively. Mean tidal 
range in Galveston channel is about 1.3 feet and 
extreme range about 2 feet under ordinary conditions. 
Height of tides in both Galveston harbor and channel is 
dependent largely on the wind, and during strong 
"northers" water surface may be depressed 2 feet below 
mean low tide. 
Local cooperation. Complied with except for inactive 
portions. 
Terminal facilities. None on Galveston Harbor, which 
is entrance channel leading to terminal facilities on 
Galveston, Texas City, and Houston Ship Channels. 
Galveston Channel terminal facilities are mostly on 
south side of channel. Principal wharves, owned by city 
of Galveston, extend from 10th to 41st Street (see Port 
Series No. 23, revised 1969) and are considered 
adequate for existing commerce. 
Operations and results during fiscal year. Major Rehabilitation: 
Supervision and administration costs for 
rehabilitation of Galveston Beach Front Groins totaled 
$45,317. Work was completed on Groins Nos. 2, 3, 4, 5, 
6A, 8A, and 9 at a cost of $875,259 with placement of 
25,909 tons blanket stone, 15,175 tons core and filler 
stones and 25,090 tons cover stone. Existing steel sheet 
pile Groins Nos. 1, 6, 7, and 8 were completely removed 
during the current and prior fiscal year. 
Maintenance: Engineering and design and supervision 
and administration cost $7,699 and $96,306. 
Condition and operation studies, inspections and 
reports, real estate activities and project condition 
surveys cost $23,152. Model studies and related 
hydrographic surveys totaled $28,057. Hired labor cost 
in completing the replacement of the inner bar channel 
north front dredging range tower damaged by a tow 
totaled $7. Miscellaneous maintenance of Fort San 
Jacinto Spoil Area by hired labor totaled $3,823. (See 
Table 15-H on dredging operations.) 
Condition at end of fiscal year. Existing project is 100 
percent complete, exclusive of inactive portions. 
Dredging of Galveston Channel to 36' depth was 
completed in November 1966. Dredging of the realigned 
Outer Bar Channel was completed in October 
1967. (See Table 15-E for total cost of existing project 
to June 30, 1970.) 
9. GULF INTRACOASTAL WATERWAY 
BETWEEN APALACHEE BAY, FLA., 
AND MEXICAN BORDER 
(GALVESTON DIST.) 
Location. Extends from a point on Sabine River about 
3 miles below Orange, Tex., to Brownsville, Tex., 
about 421 miles; a navigation channel, about 7 miles 
long, in Colorado River, extending from Matagorda, 
Tex., to Gulf of Mexico; a tributary channel in San 
Bernard River, extending from Intracoastal Waterway 
crossing to State highway bridge some 30 miles above 
crossing; a tributary channel in Colorado River 
extending from Intracoastal Waterway upstream 15.5 
miles; a tributary channel extending about 14 miles 
from Intracoastal Waterway to Palacios, Tex.; a 
tributary channel extending about 2 miles from 
Intracoastal Waterway to Rockport, Tex.; a tributary 
channel extending about 6 miles from Intracoastal 
Waterway near Port Aransas, Tex., to town of Aransas 
Pass, Tex.; a tributary channel about one-fourth mile 
long extending from Intracoastal Waterway near Port 
O'Connor, Tex., into Barroom Bay; a tributary 
channel extending about 38.8 miles from Intracoastal 
Waterway via Seadrift to a point in Guadalupe River 
5.5 miles below Victoria, Tex.; a harbor of refuge for 
small craft at Seadrift; a channel extending from gulf 
to Port Mansfield, Tex., about 11 miles; and a 
tributary channel in Arroyo Colorado extending from 
Intracoastal Waterway to a point near Harlingen, 
Tex., about 31 miles; side channels in vicinity of Port 
Isabel, Tex., and a small boat basin at Port Isabel, Tex. 
(See Coast and Geodetic Survey Charts 1116, 1117, 
592, 533, 1279, 1280, 1282, 1283, 1284, 1285, 1286, 
1287, 1288 and Dept. of Commerce, Environmental 
and Science Service Admin., Coast and Geodetic 
Survey Chart 889-SC, Nov. 68.) 
Previous project. For details see page 1859 of Annual 
Report for 1915. (West Galveston Bay and Brazos 
River Canal, Tex.) 
Existing project. Existing project dimensions provided 
for in main channel of waterway: A channel 16 feet 
deep (below mean low tide) and 150 feet wide from the 
Sabine River to Houston Ship Channel including two 
channel relocations in vicinity of High Island, miles 
316.4 to 319.1 and miles 320.1 to 325.4, relocation of 
channel 12 feet deep by 125 feet wide in Matagorda 
Bay, miles 454.3 to 471.3, relocation of channel 12 feet 
deep by 125 feet wide in Corpus Christi Bay, miles 
467

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
539.4 to 549.7 (Texas Section), (mileage is west of 
Harvey Lock, Louisiana); a channel 12 feet deep 
(below mean low tide) and 125 feet wide from Houston 
Ship Channel to Brownsville; an alternate channel, 12 
feet deep (below mean low tide) and 125 feet wide via 
Galveston Channel and Galveston Bay to the Galveston 
causeway; maintenance of existing channel, 12 
feet deep by 125 feet wide through Lydia Ann 
Channel, between Aransas Bay and Aransas Pass; 
provisions of such passing places, widening of bends, 
locks and guard locks, railway bridges over artificial 
cuts as are necessary, and the tributary channels shown 
in tabulation. (See Table 15-G on existing project 
dimensions providecd for in tributary channels; also 
Table 15-B on authorizing legislation.) 
Mean tidal variation is 0.5 foot at Orange, 1 foot at 
Port Arthur, 1.3 feet in Galveston Bay, 1.5 feet at 
Freeport, 1 foot in Matagorda Bay, 1 foot in San 
Antonio Bay, 1 foot at Corpus Christi, 1.5 feet at Port 
Isabel, and 1.5 feet at Brownsville. Extreme ranges of 
tide under ordinary conditions are 1 foot at Orange, 1.5 
feet at Port Arthur, 2 feet in Galveston Bay, 2 feet at 
Freeport, 1.5 feet in Matagorda and San Antonio Bays, 
1.5 feet at Corpus Christi, 2 feet at Port Isabel, and 1.5 
feet at Brownsville. Height of tides is dependent largely 
on wind. Strong north winds have depressed water 
surface as much as 2 feet below mean low tide. 
Estimated cost for new work is: $61,046,000, Federal 
(Corps), including $46,559 for jPort Isabel Small Boat 
Basin, and excluding expenditures on previous projects; 
non-Federal $11,896,559 ($395,000 voluntarily 
expended on GIWW, $46,559 contributed funds for 
Port Isabel, $5,116,000 lands for GIWW, $11,000 lands 
for Port Isabel, $4,367,000 relocations for GIWW and 
$1,961,000 other costs GIWW). 
Local cooperation. Fully complied with except for 
portions to be restudied, inactive portions, and provisions 
of section 101, 1962 River and Harbor Act, 
section 301, 1965 River and Harbor Act, and section 
101, 1968 River and Harbor Act. Non-Federal 
contributions estimated at $395,000 for GIWW and 
$46,559 for Port Isabel, Tex. are required. 
Terminal facilities. There are terminal facilities at 
Orange, Port Arthur, Galveston, Freeport, Port Lavaca, 
Port Aransas, Corpus Christi, Port Isabel, and 
Brownsville where this waterway coincides with 
channels improved under other projects. See Port 
Series No. 22 (revised 1969), Port Series No. 23 (revised 
1969), Port Series No. 25 (revised 1968) and Port Series 
No. 26 (revised 1969), Corps of Engineers. Local 
interests constructed terminal facilities at Port Mansfield 
and Port Harlingen. There are numerous privately 
owned piers and wharves and municipal 
wharves along the waterway. A 330-foot navigation 
district owned general cargo dock has recently been 
completed at the upper end of the Channel to Victoria. 
Facilities are adequate for existing commerce. 
Operation and results during fiscal year. New Work: 
Engineering and design and supervision and administration 
cost for Guadalupe River, Channel to 
Victoria totaled $824 and $107. Engineering and 
design and supervision and administration for planning 
on the Chocolate Bayou Channel cost $3,872 and 
$514. 
Maintenance: The Brazos River Floodgates and the 
Colorado River Locks were operated and maintained 
at a cost of $157,670 and $148,151. Engineering and 
design for the above structures cost $26,189 and 
$12,963. In addition, supervision and administration 
for the above structures cost $17,660 and $4,065. 
Reimbursable work for others for repair of structures 
by Government contracts at the Brazos River Floodgates 
and Colorado River Locks costed in the current 
and prior fiscal year is reduced by $7,775. Seven-pile 
dolphins damaged by unknown persons were replaced 
at a cost of $48,032. Telephone service credit for the 
Brazos River, West Floodgates; bathroom heaters for 
quarters at the Brazos River Floodgates; and storage 
building repairs cost $1,961. Miscellaneous repairs to 
structures, and the repair and replacement of water 
lines and construction of sewage treatment facilities 
cost $12,166. Work was commenced on removal, 
repair, painting, and re-installation of the Brazos 
River, West Floodgates, at a cost of $51,320. Seven-pile 
dolphins were replaced, the poiree dam was coated for 
rust prevention and repairs were made to the cathodic 
protection at the Colorado River Locks at a cost of 
$22,045. Miscellaneous repairs to buildings, grounds, 
and equipment including replacement of bathroom 
heaters in quarters at the Colorado River Locks cost 
$1,480. Condition and operation studies, inspections 
and reports, real estate activities and project condition 
surveys on the Main Channel and tributaries cost 
$162,864. Engineering and design and supervision and 
administration for the Main Channel and tributaries 
totaled $74,829 and $174,102. Repairs to the levee 
slopes and drainage structures along the Channel to 
Victoria cost $9,267. Waterway informational and 
directional signs were requisitioned at a cost of $3,374. 
Miscellaneous maintenance related to channel work 
including repair of reference lines and installation of 
waterway signs by hired labor forces cost $8,953. 
Payment of a claim for dredging the Main Channel 
from Port Isabel to Mud Flats, the Arroyo Colorado 
(Channel to Harlingen) and Channel to Port Mansfield 
cost $26,749. Repair and replacement of survey 
tables under two contracts cost $49,049. Hopper dredge 
range towers at Port Mansfield were repaired at a cost 
of $6,989. Minor repairs to the shoreward end of the 
Palacios breakwaters cost $196. Final cost for dredging 
the Main Channel in Matagorda Bay, completed the 
prior fiscal year, totaled $1,465 (includes removal of 
7,412 cubic yards of material). (See Table 15-H of 
chapter for dredging operations.) 
Condition at end of fiscal year. Existing project is about 
70 percent complete, exclusive of portion to be 
restudied and inactive portions. Removal of the 
railroad bridge across the canal at Mud Bayou was 
468

GALVESTON, TEX.. DISTRICT 
completed and operation and care of the facility was 
discontinued on April 14, 1969. Work remaining 
consists of the following: Improving main channel to 16 
feet deep and 150 feet wide from Sabine River to 
Houston Ship Channel, a channel 12 feet deep and 125 
feet wide through a relocated route in Matagorda Bay, 
and a channel 12 feet deep and 125 feet wide through a 
relocated route in Corpus Christi Bay (Texas Section); 
dredging Chocolate Bayou channel; and constructing a 
salt water barrier in Chocolate Bayou channel; 
constructing of jetties at mouth of Colorado River; 
dredging a navigation channel from gulf to turning 
basin at Matagorda, Tex.; constructing a dam across 
present diversion channel; and constructing a new 
diversion channel to Matagorda Bay. (See Table 15-E 
for total cost of existing project to June 30, 1970.) 
10. HOUSTON SHIP CHANNEL, TEX. 
Location. Connects Galveston Harbor, at a point 
opposite Port Bolivar, with city of Houston, Tex., 
extending 50 miles northwesterly across Galveston Bay 
through San Jacinto River and Buffalo Bayou to a 
turning basin at head of Long Reach with light-draft 
channel 7 miles long from turning basin to Main 
Street, Houston. (See Coast and Geodetic Survey 
Charts 1282 and 532.) 
Previous projects. For details see page 1856 Annual 
Report for 1915. 
Existing project. Provides for construction of certain 
cut-offs, for easing sharp bends, for construction of an 
earthen dam across the upper end of Turkey Bend, for 
the construction of 26,000 lineal feet of pile dike to 
protect the channel in upper Galveston Bay (which is 
inactive), for construction of such off-channel silting 
basins as deemed necessary by the Chief of Engineers, 
and for dimensions in various channels and basins of 
the waterways listed in the table on channel dimensions 
in Table 15-F. (Also see Table 15-B for authorizing 
legislation.) Mean tidal range under ordinary conditions 
is 0.6 foot to 1.3 feet in lower part of Galveston 
Bay; 0.6 foot to 1.3 feet in upper bay; and 0.5 to 1 foot 
in San Jacinto River and Buffalo Bayou. Extreme 
ranges under ordinary conditions are about 2 feet, 1.2 
feet, and 1 foot respectively. Freshets caused rises of 
over 12 feet in Buffalo Bayou; however, this condition 
has not occurred since completion of Addicks and 
Barker Dams for flood control on upper watershed of 
Buffalo Bayou. Height of tides is dependent largely on 
the wind, and during strong "northers" in winter 
season the water surface may be depressed 2 feet below 
mean low tide. Estimated cost for new work is: Federal 
(Corps) $31,916,000, including $42,500 for Barbours 
Terminal, excluding expenditures on previous projects; 
and non-Federal $10,413,500, including $1,365,000 
cash contributed, $2,282,500 lands, $416,000 relocations 
and $6,350,000 other costs on fully completed 
modifications. 
Local cooperation. Complied with except for inactive 
portions, and section 301, 1965 River and Harbor Act. 
Non-Federal contributions estimated at $1,365,000. 
Terminal facilities. City of Houston and Harris County 
Houston Ship Channel Navigation District operate 
modern terminals which supplement privately owned 
wharves, piers, and docks. See Port Series No. 24 
(revised 1969) Corps of Engineers. Facilities considered 
adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Engineering and design and supervision and administration 
costs for planning for dredging Greens 
Bayou Channel (Mile 0 to Mile 1.65) totaled $1,446 
and $237. 
Maintenance: Engineering and design including 
model studies and supervision and administration cost 
$150,175 and $99,398. Condition and operation 
studies, inspections and reports, real estate activities, 
and project condition surveys cost $15,818. Cost for 
dredging Sims Bayou to the turning basin, Brady 
Island Channel and light-draft channel in Buffalo 
Bayou, completed in FY 1969 totaled $29,294. (See 
Table 15-H on dredging operations.) 
Condition at end of fiscal year. Existing project is 98 
percent complete, exclusive of inactive portions. Work 
remaining consists of dredging a channel in Greens 
Bayou. (See Table 15-E for total cost of existing project 
to June 30, 1970.) 
11. MATAGORDA SHIP CHANNEL, TEX. 
Location. This is a consolidation of shallow draft 
channel improvements of "channel from Pass Cavallo 
to Port Lavaca, Tex.," and deep draft channel 
improvements authorized under "Matagorda Ship 
Channel, Tex." Bar at Pass Cavallo is 125 miles 
southwest of Galveston entrance and 54 miles north of 
Aransas Pass. It connects Matagorda Bay with the gulf. 
Project extends across Matagorda Bay and Lavaca Bay 
to towns of Port Lavaca and Point Comfort. These two 
towns are on opposite sides of Lavaca Bay and both are 
about 26 miles northwest from Pass Cavallo. (See Coast 
and Geodetic Survey Chart 1117.) 
Existing project. Existing project dimensions provided 
for in various channels and basins are listed in Table 
15-F on channel dimensions. (Also see Table 15-B for 
authorizing legislation.) 
Project also provides for dual jetties at entrance, 
south jetty extending 6,000 feet to 24-foot depth in the 
gulf and north jetty extending 5,900 feet to 24-foot 
depth. Under ordinary conditions mean tidal range is 
about 1 foot and extreme range about 2 feet. Height of 
tide is dependent largely on the wind, and during 
strong "northers" in winter season the water surface 
may be depressed 2 feet below mean low tide. 
Local cooperation. Fully complied with. 
Terminal facilities. Privately owned facilities at Port 
Lavaca, municipal owned facilities at mouth of Lynn 
469

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Bayou, privately owned and publicly owned facilities 
at Point Comfort, Tex. These facilities are considered 
adequate for present commerce. Facilities at Point 
Comfort consist of a channel, turning basin with 
wharfs, oil dock and loading equipment, all owned by 
Aluminum Co. of America; and a wharf built by local 
interest at Point Comfort turning basin. d Operation 
and results during fiscal year. Maintenance: Engineering 
and design and supervision and administration 
cost $15,713 and $147,576. Condition and 
operation studies, inspections and reports, real estate 
activities and project condition surveys cost $21,533. 
Information and directional signs cost $288. Survey 
tables constructed by contract cost $11,596. (See Table 
15-H for dredging operations.) 
Condition at end offiscalyear. The project is complete. 
12. SABINE-NECHES WATERWAY, TEX. 
Location. This is a consolidation of old improvements 
of "Harbor at Sabine Pass and Port Arthur Canal" and 
"Sabine-Neches Canal, including Sabine River to 
Orange and Neches River to Beaumont, Tex." Sabine 
Pass is on Gulf of Mexico about 58 miles east of 
Galveston and 280 miles west of Southwest Pass, 
Mississippi River. It connects Sabine Lake with gulf. 
Port Arthur Canal extends 7 miles from near upper end 
of Sabine Pass to Port Arthur docks at mouth, of 
Taylors Bayou. Near its upper end, Sabine-Neches 
Canal joins and extends to mouths of Neches and 
Sabine Rivers. Waterway next extends up Neches 
River to Beaumont and up Sabine River to Orange. 
(See Coast and Geodetic Survey Charts 517, 533, and 
1279.) 
Previous projects. For details see page 1863 of Annual 
Report for 1915, page 985 of Annual Report for 1916, 
and page 873 of Annual Report for 1926. 
Existing project. Existing project dimensions provided 
for in various channels and basins are set forth in Table 
15-F on channel dimensions. (Also see Table 15-B 
authorizing legislation.) Project also provides for two 
stone jetties at Sabine Pass entrance from the gulf, 
western jetty to be 21,905 feet long and eastern jetty 
25,310 feet long. Project further provides for removal of 
guard lock in Sabine-Neches Canal, construction of 
suitable permanent protective works along Sabine 
Lake frontage owned by city of Port Arthur to prevent 
dredged material from entering Sabine Lake and to 
prevent erosion of material deposited, reconstruction of 
Port Arthur Bridge, and relocation of Port Arthur field 
office. Mean tidal variation at entrance is about 1.5 
feet, at Port Arthur about I foot, and at Orange and 
Beaumont about five-tenths foot. Prolonged north 
winds during winter season have depressed water 
surface as much as 3.4 feet below mean low tide while 
tropical disturbances have caused heights as much as 8 
feet above mean low tide. Estimated cost for new work 
is: Federal (Corps) $53,707,000 excluding expenditures 
on previous projects; and non-Federal $6,221,000, 
including $1,410,000 contributed funds, $32,000 value 
of useful work performed, and $319,000 value of 
expired service life of old bascule highway bridge at 
Port Arthur, Tex.; $1,899,000 lands and $2,561,000 
relocations. 
Local cooperation. Complied with except for inactive 
portion of project, and provisions of section 101, 1962 
River and Harbor Act. Non-Federal contributions 
estimated at $1,761,000 are required. 
Terminal facilities. See volume 2, Port Series No. 22 
(revised 1969), Corps of Engineers. There are 3 
wharves and piers in addition to the facilities included 
in the referenced Port Series. Facilities are considered 
adequate for present commerce. 
Operation and results during fiscal year. New work: 
Engineering and design and supervision and administration 
on the 40-foot project cost $35,738 and 
$359,592. 
Construction was continued on the new high level 
bridge over the Sabine-Neches Canal at Port Arthur, 
Texas, at a cost of $622,301 (includes $85,878 
contributed funds). Cost for demolition and removal of 
the old bascule bridge at Port Arthur, Texas, totaled 
$4,357 (includes $601 contributed funds). Miscellaneous 
hired labor cost in conjunction with 
relocation of the bridge totaled $2,427. Work was 
completed on construction of the Sabine Lake North 
Spoil Area on September 16, 1969 at a cost of $197,874. 
(See Table 15-H for dredging operations on new work). 
Maintenance: Engineering and design and supervision 
and administration cost $33,260 and 
$100,695. Condition and operation studies, inspections 
and reports, real estate activities and project condition 
surveys cost $28,623. :Waterway directional and information 
signs, tide flaps gates for the Sabine Lake 
South Spoil Area, and hired labor operations related to 
channel work totaled $1,349. Work was completed on 
construction of the Sabine North Spoil Area on 
September 16, 1969, with placement of 15,615 tons 
blanket stone and 35,979 tons of riprap at a cost of 
$330,052. Cost for replacement of Sabine Bank hopper 
dredge range tower (R-3), damaged by a passing ship, 
totaled $68,618. (See Table 15-H on dredging operations.) 
Condition at end of fiscal year. Existing project is about 
77 percent complete exclusive of inactive portion. 
Authorized work is complete except for deepening 
project to 40 feet and dredging a 12-foot channel in 
Sabine River from Orange to Echo, Tex. Removal of 
obstructive bridge at Port Arthur was completed 28 
May 1969. The high-level fixed bridge across Sabine- 
Neches Canal is approximately 98% complete. (See 
Table 15-E for total cost of existing project toJune 30, 
1970.) 
13. TEXAS CITY CHANNEL, TEX. 
Location. Texas City is on mainland of Texas on west 
side of Galveston Bay, about 10 miles northwest of city 
470

GALVESTON, TEX., DISTRICT 
of Galveston. (See Coast and Geodetic Survey Charts 
886 and 1282.) 
Previous projects. For details see page 1856 of Annual 
Report for 1915. 
Existing project. Existing project dimensions provided 
for in various channels and basins are set forth in Table 
15-F on channel dimensions. (Also see Table 15-B 
authorizing legislation.) 
Project also provides for easing the approach to the 
turning basin; a pile dike 28,200 feet long, parallel to 
and north of the channel; and a rubble-mound dike, 
27,600 feet long, along the southerly side of the pile 
dike. Under ordinary conditions mean tidal range is 
about 1.3 feet and extreme range is about 2 feet. Height 
of tide is dependent largely on the wind and during 
strong "northers" water surface may be depressed 2 feet 
below mean low tide. 
Local cooperation. Fully complied with. 
Terminal facilities. Privately owned terminal facilities 
are on the mainland at inner end of this channel and 
are considered adequate for existing commerce. A 
deep-draft canal extending 2 miles southwestward 
from south end of Texas City turning basin and a 
turning basin have been constructed by local interests. 
See Port Series No. 23 (revised 1969), Corps of 
Engineers. 
Operations and results during fiscal year. Maintenance: 
Engineering and design and supervision and administration 
cost $7,298 and $19,066. Condition and 
operation studies, inspections and reports, real estate 
activities and project condition surveys cost $2,071. 
(See Table 15-H for dredging operations.) 
Condition at end of fiscal year. Project is 100 percent 
complete. (See Table 15-E for total cost of existing 
project to June 30, 1970.) 
14. TRINITY RIVER AND TRIBUTARIES, 
TEX. 
Location. The main stem of the Trinity River is 
formed at Dallas by the confluence of the West Fork 
and the Elm Fork at river mile 505.5. The mouth of the 
Trinity is about one-half mile west of Anahuac, Texas. 
(See Geological Survey base map, Texas, scale 
1:500,000). 
Previous projects. For details of abandoned locks and 
dam construction see page 986 of Annual Report for 
1932. 
Existing project. See individual detailed reports on 
Anahuac Channel, Channel to Liberty and Wallisville 
Lake. Project includes the existing Federal project 
designated as "Mouth of Trinity River, Texas," which 
was completed in 1907 at a cost of $80,000 (no cost to 
local interest). Project is not being maintained. (See 
Table 15-B for authorizing legislation.) 
Local cooperation. See individual detailed reports on 
Channel to Liberty and Wallisville Lake. There is no 
local cooperation required for Anahuac Channel. 
Terminal facilities. Privately owned wharves and piers 
at Anahuac, Moss Bluff, Wallisville, and Liberty, 
Texas, are adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Engineering and design and supervision and administration 
cost $25,209 and $315 in connection with 
high-level bridge crossing the Trinity River at State 
Highway No. 105. Cost of State Highway Bridge No. 
190 was $5,680. The Government's share of cost for 
high-level bridges paid the State of Texas for period 
(Jul. 1, 1969 to June 30, 1970) was $28,480. 
Condition at end of fiscal year. The restudy of the 
navigation benefits is complete, the high-level bridge 
crossing the Trinity River at State Highway No. 190 is 
100% complete, and preconstruction planning for highlevel 
bridge at State Highway No. 105 is in progress. 
(See Table 15-E for total cost of existing project to 30 
June 1970.) 
14A. ANAHUAC CHANNEL, TEX. 
Location. Extends from 6-foot depth in Galveston Bay 
to Anahuac, Tex., opposite mouth of Trinity River, 38 
miles north of Galveston, Tex. (See Coast and Geodetic 
Survey Chart 1282.) 
Existing project. No project dimensions authorized by 
1905 River and Harbor Act. A 6- by 80-foot channel, 
16,000 feet long was dredged in 1905. At present a 6- by 
100-foot channel is maintained. Under ordinary 
conditions tidal range is 0.6 to 1.2 feet. Height of tide is 
dependent largely on wind. Strong north winds depress 
water surface 1.5 feet below mean sea level. Latest 
published map is in House Document 440, 56th 
Congress, 1st session. 
Local cooperation. None required. 
Terminal facilities. Privately owned wharves and piers 
are the only terminal facilities at Anahuac. 
Operations and results during fiscal year. Maintenance: 
Engineering and design and supervision and administration 
cost $2,400 and $3,750. Condition and 
operation studies, inspections and reports, real estate 
activities, and project condition surveys cost $1,000. 
(See Table 15-H for dredging operations.) 
Condition at end of fiscal year. Project was completed in 
1911. 
14B. CHANNEL TO LIBERTY, TEX. 
Location. Improvement is located in Galveston Bay 
and tidal reach of lower Trinity River. (See Geological 
Survey Maps for Anahuac, Cove, Moss Bluff, and 
Liberty, Texas). 
Previous projects. For details see page 986 of Annual 
Report for 1932. 
Existing project. Provides for a 6-foot channel from 
Anahuac to Liberty which was completed in 1925. A 
navigable channel from the Houston Ship Channel 
near Red Fish Bar in Galveston Bay to Liberty, Texas, 
with depth of 9 feet and width of 150 feet, extending 
471

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
along the east shore of Trinity Bay to the mouth of the 
Trinity River at Anahuac, thence in the river channel 
to a turning basin at Liberty, Texas, and a protective 
embankment along the west side of the channel in 
Trinity Bay. (See Table 15-B for authorizing legislation.) 
Local cooperation. Fully complied with for portion of 
"Channel to Liberty" between Houston Ship Channel 
and 1 mile below Anahuac, Tex., as required by 1946 
River and Harbor Act (H. Doc. 634, 79th Cong., 2d 
sess.), but not complied with for remaining portion of 
"Channel to Liberty" as required by River and Harbor 
Act of 1945 (H. Doc. 403, 77th Cong., 1st sess.), at an 
estimated total cost of $550,000, of which $460,000 is 
for lands and rights-of-way and $90,000 for pipeline 
relocations for 9- by 150-foot channel. 
Terminal facilities. Privately owned wharves and docks 
at Anahuac, Wallisville, Texas Gulf Sulphur Co.'s slip, 
Moss Bluff and Liberty, Tex., are adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
Engineering and design and supervision and administration 
cost $10,137 and $24,006. Condition and 
operation studies, inspections and reports, real estate 
activities, and project condition surveys cost $1,868. 
(See Table 15-H for dredging operations.) 
Condition at end of fiscal year. The 6-foot Channel to 
Liberty was completed in 1925. The 9-foot Channel to 
Liberty has been dredged from junction with Houston 
Ship Channel to a point one mile below Anahuac, 
Texas. Work remaining consists of dredging a 9' x 150' 
channel from one mile below Anahuac, Texas to 
Liberty, Texas. 
14C. WALLISVILLE LAKE, TEX. 
Location. Dam is at river mile 3.9, about 4 miles 
northwest of Anahuac Tex. (See Coast and Geodetic 
Survey Chart 1282). 
Existing project. Provides for construction of a 39,220- 
foot dam to store water to elevation 4 feet above mean 
sea level, with an 84- by 600-foot navigation lock in a 
cutoff channel; and extension of authorized channel to 
Liberty from its present terminus at channel mile 23.2 
to Texas Gulf Sulphur channel at channel mile 33.6. 
Dam is composed of a nonoverflow section 16,820 feet 
long with a crest elevation varying from 13.0 to 10.0 
feet above mean sea level, and an overflow section 
22,400 feet long. All but 1,500 feet of overflow section 
has a crest elevation of 5.5 feet above mean sea level. 
The two remaining portions of overflow section have 
crest elevations of 4.0 feet above mean sea level. Both 
the overflow and nonoverflow sections basically are 
earthern levees with full or partially riprapped side 
slopes and paved roadways on their crest. Lock is at 
channel mile 28.3, has a sill depth of minus 16.17 feet 
below mean sea level, a normal lift of 4 feet and is 
founded on piles in clay. Dam controls a drainage area 
of 1,262 square miles below Livingston Dam (non- 
Federal project at channel mile 99.2) and has a storage 
capacity of 58,000 acre-feet. Under ordinary conditions 
mean tidal range in bay is from 0.6 foot to 1.2 feet. 
Height of tide is dependent largely on wind. Strong 
northerly winds depress water surface 1.5 feet below 
mean sea level. Total estimated cost of project is 
$24,400,000 Federal (Corps) and $14,000 non-Federal 
for lands for construction of portion of channel to 
Liberty. (See Table 15-B for authorizing legislation.) 
Local cooperation. Local interests must contribute an 
amount equal to cost allocated to water supply, onehalf 
of cost allocated to salinity control and cost 
allocated to recreation less cost of basic facilities and 
less 15 percent of total project cost. Local interest 
contribution is estimated at $4,200,000. For improvement 
of the navigation channel, exclusive of 
reservoir features, local interests must provide lands, 
spoil areas, and adequate terminal and transfer 
facilities, make necessary relocations of utilities crossing 
natural river channel and give assurances that they 
will hold and save the United States free from claims 
for damages, including but not limited to damages due 
to salt water intrusions, that may result from construction 
and operation of the navigation improvements. 
Operations and results during fiscal year. New work: 
Engineering and design and supervision and administration 
cost $162,768 and $42,407. Administration 
cost for Federal purchases of land totaled 
$108,494. Land payments totaled $1,012,795. Miscellaneous 
work by hired labor forces totaled $348. 
Condition at end of fiscal year. The project is 30 percent 
complete. Preconstruction planning has been completed, 
land acquisition is continuing and a contract for 
construction of access road, Big Hog intake Structure, 
intake canal and acess bridge was completed in 
October 1968. Work remaining consists of constructing 
the lock and dam, roads, diversion channel, navigation 
channel and recreation facilities. 
15. OTHER AUTHORIZED NAVIGATION 
PROJECTS. 
See Table 15-C. 
16. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION. 
Navigation activities pursuant to section 107, Public Law 86- 
645 (preauthorization) 
Fiscal year costs for preauthorization studies were 
$4,133 for Corpus Christi Small Boat Basin, Tex.; 
$5,939 for GIWW-Highland Bayou, Tex.; $5,145 for 
GIWW, Tex. (Offatts Bayou); $2,500 for Corpus 
Christi Ship Channel, Tex. (Port Aransas Breakwater); 
$1,175 for GIWW, Port Isabel Side Channel 
Enlargement, Tex., and $33,767 for GIWW-Tributary 
Channel to Aransas Pass, Tex. 
472

GALVESTON, TEX., DISTRICT 
FLOOD CONTROL 
17. BUFFALO BAYOU AND TRIBUTARIES, 
TEX. 
Location. Improvements are on Buffalo Bayou watershed, 
a part of San Jacinto River watershed, in 
Harris County, west and northwest of city of Houston, 
Tex. (See Geological Survey quadrangle sheets for 
Harris County.) 
Existing project. Provides for improvement of Buffalo 
Bayou and its tributaries above turning basin 
(Houston) of Houston Ship Channel to control floods 
for protection of city of Houston, and prevent deposition 
of silt in turning basin of ship channel by 
constructio enlargement and rectification of channels 
and construction of control works. Estimated cost for 
new work is: Federal (Corps) $74,200,000 and non- 
Federal $45,890,000 for lands and relocations. (See 
Table 15-I on Buffalo Bayou and tributaries.) (Also 
Table 15-B for authorizing legislation.) 
Local cooperation. Section 203, 1954 Flood Control Act 
applies. Local interests have accomplished 100 percent 
of all required local cooperation on Brays Bayou, and 
99 percent on WhiteOak Bayou, which includes the authorized 
extension to Cole Creek. OnBuffalo Bayou, local 
interests purchased interests that the United States 
had in 7 miles of rectified channel below Barker and Addicks 
Dams for $256,651. Of the remaining required 
rights-of-way on Buffalo Bayou, local interests have 
acquired about 44 percent. Also 66 percent of required 
bridge relocations and 4 percent of required utility 
relocations have been accomplished. Advance of 
$4,400,000 by the Harris County Flood Control 
District was refunded in September 1956. Public 
Law 86-53 authorized reimbursement of $38,726 to 
Galveston, Houston and Henderson Railroad Co. for 
bridge alterations at Brays Bayou. Non-Federal 
contributions totaled $63,661 for project betterments. 
Operation and results during fiscalyear. New Work: Brays 
Bayou. Engineering and design and supervision and 
administration cost $745 and $105. Miscellaneous 
purchases cost $5,927. White Oak Bayou. Engineering 
and design and supervision and administration cost 
$17,270 and $39,451. Construction Channel 
(Burlington-Rock Island Railroad to Cole Creek) 
performed (Jul. 1, 1969 to Jan. 9, 1970) totaled 
$872,587. Alteration to Southern Pacific Railroad 
Bridge performed Jul. 1 to Aug. 27, 1969, totaled 
$19,099. Channel Paving Repairs (Sta 205+25 to 
207+ 75 and 441 + 63 to 453+ 51) performed Nov 10 to 
Dec. 9, 1969, totaled $45,240. Channel paving repairs 
(Heights Blvd. to Southern Pacific Railroad) performed 
May 25 tO Jun. 30, 1970, totaled $104,500. 
Turfing (Burlington-Rock Island Railroad to Cole 
.Creek) performed May 26 to Jun. 30, 1970, totaled 
$27,550. Hired labor work totaled $993. Buffalo Bayou. 
New Work: Engineering and design and supervision 
and administration cost $11,757 and $647. 
Maintenance: Addicks Dam and Barker Dam were 
operated and maintained at a cost of $52,601 and 
$47,310. Limestone purchased for road repairs for 
Addicks and Barker Dams totaled $568 and $1,930. 
Supervision and administration and acquisition expenses 
at Addicks Dam and Barker Dam totaled 
$19,669 and $14,461. 
Condition at end of fiscal year. Existing project is about 
68 percent complete. Construction of Barker Dam was 
completed in February 1945. Construction of Addicks 
Dam and 7.4 miles of channel rectification downstream 
from Addicks and Barker Dams was completed in 
October 1948. Modification of Barker and Addicks 
Dams consisting of gating of two uncontrolled conduits 
in each dam, was completed in fiscal year 1963. 
Channel rectification on Brays Bayou was completed 
in FY 1969 except for minor clean-up between 
Southwest Freeway and Westheimer Road. Channel 
rectification of White Oak Bayou is about 80% 
complete. Design work on Buffalo Bayou is in progress. 
18. FREEPORT AND VICINITY, TEX. 
(HURRICANE-FLOOD PROTECTION) 
Location. Freeport is in southern part of Brazoria 
County on Gulf of Mexico at mouth of Brazos River, 
about 43 miles southwest of Galveston, Tex. 
Existing project. Authorized plan provides for hurricane-
flood protection for a highly industrialized area 
and community of about 39,000 persons. Major 
features of project consist of improvements to 42.8 miles 
of existing levees, two interior drainage pumping plants 
and 2.1 miles of new levee. Estimated cost for new work 
is: $15,600,000 Federal (Corps) and non-Federal 
$6,690,000 consisting of $3,409,000 cash, $1,893,000 
lands, and $1,388,000 relocations. (See Table 15-B for 
authorizing legislation.) 
Local cooperation. Sec. 203, 1962 Flood Control Act 
applies. Non-Federal contribution estimated at 
$6,690,000 is required. 
Operations and results during fiscalyear. Engineering and 
design and supervision and administration costs totaled 
$365,119 and $145,21.8. Contributed lands in the 
amount of $106,177 were received and local interests 
performed $65,140 of relocation work. Costs totaling 
$1,264 were reported for construction of gravity 
drainage structure (Sta 52+00, East Storm Levee). 
Construction of South Storm Levee (Sta 46+ 00 to Sta 
188 + 00) for period July 1, 1969 to June 30, 1970 cost 
$50,657. Procurement of vertical pumps and machinery 
for Freeport Pumping Station for period July 1, 
1969 to June 30, 1970 cost $7,360. Construction of the 
473

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Freeport Pumping Station for period July 1, 1969 to 
June 30, 1970 cost $419,830. Construction of the East 
Storm Levee for period July 1, 1969 to June 30, 1970 
cost $265,610. Value engineering studies performed 
during fiscal year cost $1,093. Miscellaneous repairs 
totaling $205 were made by Government forces. 
Condition at end offiscalyear. Project is about 30 percent 
complete. Work remaining consists of acquisition of 
lands, construction of road ramps, levees and pumping 
plants. 
19. HIGHLAND BAYOU, TEX. 
Location. Rises near Arcadia, in Galveston County, 
Tex., and flows into Jones Bay, an arm of West Bay. 
The watershed, with an area of about 38 square miles, 
lies entirely within Galveston County and is about 14 
miles long and varies in width from about 0.3 mile at its 
lower end to a maximum of about 5 miles near its 
midpoint. (See Coast and Geodetic Chart 886). 
Existing project. Plan of improvement provides for 
enlargement and rectification of Highland Bayou 
Channel and construction of a diversion dam in 
Highland Bayou, with a diversion channel extending 
southerly from the diversion dam and emptying into 
Jones Bay, which lies on the north side of West Bay. 
Estimated cost of new work is: Federal (Corps) 
$5,100,000 and non-Federal $1,990,000 consisting of 
$905,000 lands and $1,085,000 for relocations. (See 
Table 15-B for authorizing legislation.) 
Local cooperation. Section 204, 1965 Flood control Act, 
applies. 
Operations and results during fiscal year. New work: 
Planning was continued during the fiscal year at a cost 
of $87,686. 
Condition at end offiscalyear. Preconstruction planning 
is in progress. 
20. LIBERTY LOCAL PROTECTION 
PROJECT 
Location. Along the Trinity River adjacent to the city 
of Liberty, Liberty County, Texas. 
Existing project. Plan of improvement, under present 
authorization, provides for the construction of about 
59,400 feet of levee having a freeboard of 4 feet above 
the design discharge water surface and provisions for 
interior drainage facilities. Estimated cost for new work 
is: Federal (Corps) $2,250,000 and non-Federal 
$450,000 consisting of $347,000 lands and $103,000 
relocations. (See Table 15-B for authorizing legislation.) 
Local cooperation. Section 3, 1936 Flood Control Act 
applies. 
Operations and results during fiscal year. Preconstruction 
planning was continued during the fiscal year at a cost 
of $17,196. 
Condition at end of fiscal year. Preconstruction planning 
is in progress. 
21. PORT ARTHUR AND VICINITY, 
TEXAS (HURRICANE-FLOOD 
PROTECTION) 
Location. Port Arthur is on west shore of Sabine Lake 
in extreme southeast part of Texas, about 14 miles from 
the gulf. Area under consideration is comprised of 
about 38,500 acres, and includes cities of Port Arthur 
and Groves, towns of Griffing Park, Pear Ridge, and 
Lakeview, and adjacent industrial areas. 
Existing project. Authorized plan provides for: Raising 
and reconstructing 6.3 miles of existing concrete and 
steel sheet-pile seawall; constructing 0.3 mile of new 
concrete and sheet-pile seawall; raising and improving 
7.5 miles of existing earth levees; constructing 20.3 
miles of new earth levees and constructing four interior 
drainage pumping plants. Estimated cost for new work 
is: Federal (Corps) $47,400,000 and non-Federal 
$20,300,000 consisting of $15,370,000 cash contribution, 
$3,800,000 for lands and $1,130,000 for 
relocations. Additional non-Federal cost for pumping 
station betterments and levee realignment betterments 
is $638,000. (See Table 15-B for authorizing legislation.) 
Local cooperation. Section 203, 1962 Flood Control Act 
applies. Non-Federal contributions estimated at 
$20,300,000 are required. An additional $638,000 will 
be contributed for project betterments requested by 
local interests. 
Operation and results during fiscal year. New work: 
Engineering and design and supervision and administration 
cost $501,613 and $149,761. Contributed 
lands in the amount of $253,528 were received and 
local interests performed $164,984 of relocation work. 
Construction of levee (Sta. 312+00 to Sta. 376+ 50) 
was performed (Jul. 1, 1969 to Dec. 16, 1969) cost 
$145,860. Construction of the floodwall and levee (Sta. 
556+ 00 to Sta. 583+ 75) was performed Jul. 1, 1969 to 
Nov. 14, 1969) cost $118.60. Construction of levee (Sta. 
946+ 00 to Sta. 1212+ 50) was performed July 1, 1969 
to Jun. 30, 1970 cost $935,910. Procurement of large 
vertical pumps and machinery for Crane Bayou and 
Lakeside Pumping Stations July 1, 1969 to Jun. 30, 
1970 cost $12,059. Procurement of small pumping units 
for Crane Bayou, Lakeside and Port Acres Pumping 
Stations performed July 1, 1969 to Jun. 30, 1970 cost 
$68,920. Construction of levee (Port Acres area, Sta 
1221+ 20 to Sta 1293+ 60) performed May 20 to June 
30, 1970 cost $120,000. Construction of levee (Port 
474

GALVESTON, TEX., DISTRICT 
Acres area, Sta 1323+00 to Sta 1443+00 and Sta 
1465 + 00 to Sta 1541 + 20) was performed May 25 to 
June 30, 1970 at a cost of $117,650. Turfing of levee 
(Sta 312+ 00 to Sta 376+ 50) performed April 14, to 
May 19, 1970 cost $13,900. Miscellaneous repairs and 
storage of pumps by Government forces cost $8,720. 
Value engineering studies performed during fiscal year 
cost $2,550. 
Condition at end of fiscal year. Construction on the 
project was initiated in March 1966. The project is 
approximately 18 percent complete. 
22. TAYLORS BAYOU, TEX. 
Location. Watershed of Taylors Bayou is in extreme 
southeast corner of Texas adjoining basins of Neches 
River and Sabine Lake on the east. City of Port Arthur 
is about 8 miles from the main stream of Taylors 
Bayou. (See Coast and Geodetic Chart 885). 
Existing project. Improvement of Taylors Bayou by 
enlarging and rectifying approximately 53 miles of 
natural and artificial channels on Taylors Bayou and 
tributary water courses; the construction of a diversion 
channel, 2.9 miles long, from Mile 2.1 on Taylors 
Bayou to Taylors Bayou Outfall Canal at Mile 0.9; a 
salt water gate across the diversion channel to prevent 
the intrusion of salt water into Taylors Bayou; and 
enlargement of the Gulf Intracoastal Waterway from 
the Outfall Canal to Port Arthur Canal, a distance of 
approximately 1.3 miles, including alteration of the 
approach span of State Highway 87 bridge. Estimated 
cost for new work is: Federal (Corps) $12,900,000 and 
non-Federal $6,830,000, including $4,400,000 cash 
contribution, $1,445,000 lands, and $985,000 for 
relocations. (See Table 15-B for authorizing legislation.) 
Local cooperation: Section 204, 1965 Flood Control Act, 
applies. Non-Federal contributions estimated at 
$4,400,000 are required. 
Operation and results during fiscal year. New work: 
Planning was continued during the fiscal year at the 
cost $13,720. 
Condition at end of fiscal year. The General Design 
Memorandum, which included the reevaluation of 
benefits, was approved October 31, 1969. 
23. TEXAS CITY AND VICINITY, TEX. 
(HURRICANE-FLOOD PROTECTION) 
Location. On the west and southwest shore of 
Galveston Bay, about 9 miles northwest of Galveston, 
Texas. Project has a frontage of about 14 miles on 
Galveston Bay and protects a land area of about 78 
square miles. 
Existing project. Plan provides for construction of 
improvements at Texas City, La Marque, and Hitchcock, 
Texas, for control of storm tides. Improvements 
consist of 28.4 miles of new levees, 3 miles concrete 
floodwall, related drainage and stoplog structures, two 
tidal interchange structures, two tide control and 
navigation structures, and a pumping plant. Estimated 
cost for new work is: Federal (Corps) $37,800,000 and 
non-Federal $16,200,000 for seawall with closure 
structures, including $14,176,000 cash contribution 
and $2,024,000 for lands. Additional non-Federal cost 
for ramps in lieu of closure structures is $142,000. (See 
Table 15-B for authorizing legislation.) 
Local cooperation. Requirements are in Sec. 203, 1958 
and 1968 Flood Control Acts. Based on 1970 estimates, 
local interests must contribute $16,200,000 toward the 
project, and, at their option, ah additional $142,000 for 
ramps in lieu of closure structures. About $7,500,000 
from county bond issue is available to defray non- 
Federal costs. Local interests acquired about 51 percent 
of lands needed for the project and are proceeding with 
acquisition of lands. 
Operation and results during fiscal year. New work: 
Engineering and design and supervision and administration 
cost $539,436 and $166,974. Relocations 
were accomplished under contracts at a cost of $37,810. 
Hired labor in conjunction with levee work totaled 
$8,500. Construction of Levee, second stage (Sta. 
141 + 50 to Sta. 189 + 50) was performed Jul. 1, 1969, 
to Oct. 29, 1969, cost $290,683. Construction of the 
Levee, (Sta. 537 + 50 to 629 + 00) was performed Jul. 1, 
1969 to Oct. 3, 1969 at a cost of $84,215. Construction 
of closure levee (Sta. 727+ 75 to Sta. 730 + 25) was 
performed Mar. 6, 1970 to June 16, 1970 at a cost of 
$17,630. Construction of the Structures, Sta. 629+00 
to Sta. 681 + 00 was performed Jul. 1, 1969 toJun. 30, 
1970 at a cost of $734,010. Costs in amount of $1,755 
were reported for construction of South Texas City 
Pumping Station. Repair of cooling coils, South Texas 
City Pumping Station was performed (July 1, 1969 to 
December 4, 1969) cost $48,522. Alteration of State 
Highway Nos. 3 and 146 cost $2,312. Relocation of 
railroad and drainage ditch cost $43,893. Establishment 
of Turf (Sta. 537 +50 to 629+00) cost 
$14,800. Miscellaneous purchase orders in amount of 
$3,063 were paid. 
Condition at end of fiscal year. The project is about 39 
percent complete. Work remaining consists of acquisition 
of lands, relocation of railroad ramps and 
signals, construction of levees, floodwalls, tidal interchange 
structures, and tide control and navigation 
structure. 
24. VINCE AND LITTLE VINCE BAYOUS, 
TEX. 
Location. Watershed of Vince Bayou and tributary, 
Little Vince Bayou, has an area of about 17 square 
miles and lies entirely within Harris County. Vince 
Bayou is a minor tributary of Buffalo Bayou in San 
Jacinto River Basin on upper gulf coast of Texas. 
Existing project. Provides for enlarging and rectifying 
channel of Vince Bayou from mouth to a point about 
7.3 miles upstream and Little Vince Bayou from mouth 
475

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
to a point about 4.2 miles upstream, a total distance in 
both streams of about 11.5 miles. Estimated cost for 
new work is: Federal (Corps) $6,600,000 and non- 
Federal $3,535,000, consisting of $2,245,000 for lands 
and $1,290,000 for relocations. (See Table 15-B for 
authorizing legislation.) 
Local cooperation. Sec. 203, 1962 Flood Control Act, 
applies. Local interests have acquired 95 percent of real 
estate for Vince Bayou channel rectification. About 55 
percent of all required relocations on Vince Bayou has 
been accomplished. On Little Vince Bayou, local 
interests have acquired80 percent of the real estate and 
accomplished 3 percent of the required relocations. 
Operations and results during fiscalyear. Engineering and 
design and supervision and administration cost $13,565 
and $43,362. Relocations were accomplished under 
contracts at a cost of $101,266. Channel Rectification 
(Sta. 102 + 00 to Sta. 202 + 35) was performed Jul. 1, 
1969 to Jun. 30, 1970 at a cost of $781,150. Value 
engineering studies performed during fiscal year cost 
$5,182. 
Condition at end of fiscal year. Two railroad bridges on 
Vince Bayou have been relocated and work on channel 
rectification on Vince Bayou between Mile 1.9 and 3.8 
was initiated in Apr. 68. The project is about 33 
percent complete. 
25. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspections of completed flood control local protection 
projects operated and maintained by local 
interests were made on Tranquitas Creek, _Kingsville, 
Texas (October 1969 and May 1970); Colorado River, 
Matagorda, Texas (October 1969 and April 1970); 
Hurricane-Flood Protection at Freeport & Vicinity, 
Texas (November 1969 and June 1970); Lavaca- 
Navidad Rivers, Hallettsville, Texas (October 1969 
and May 1970); Little Cypress Bayou, Orange, Texas 
(October 1969 and April 1970); San Diego Creek at 
Alice, Texas (October 1969 and May 1970); Galveston 
Seawall at Galveston, Texas (December 1969 and May 
1970); Buffalo Bayou & Tributaries, Buffalo Bayou 
Rectified Channel and Brays Bayou Channel at 
Houston, Texas (November 1969 and May 1970); 
Guadalupe River Levee at Victoria, Texas (October 
1969 and May 1970); and Channel to Victoria, 
GIWW, Access Road and Missouri Pacific railroad 
bridge (October 1969 and May 1970); Hurricane- 
Flood Protection at Port Arthur & Vicinity, Texas 
(November 1969 and May 1970); Big Hog Intake 
Bayou at Wallisville Lake, Texas (November 1969 and 
June 1970); and Hurricane-Flood Protection at Texas 
City & Vicinity, Texas (December 1969 and May 
1970) at a cost of $3,398. 
26. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS. 
See Table 15-D. 
27. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION. 
Emergency flood control activities-repair, flood fighting, and 
rescue work (Public Law 99, 84th Cong., and antecedent 
legislation.) 
Fiscal year Federal costs were $14,159 for advance 
preparation and $4,431 for flood emergency operations. 
(See Table 15-J on flood control work under 
special authorization.) 
28. SURVEYS. 
Cost of surveys during fiscal year: navigation, 
$248,318; flood control $81,447; beach erosion cooperative, 
$349; hurricane, $484,133; National Shoreline, 
$17,802; water pollution, $126,051; and coordination 
with other agencies - Soil Conservation 
Service, $1,295 and Bureau of Reclamation, $222. 
29. COLLECTION AND STUDY OF BASIC 
DATA. 
Flood plain management, comprehensive flood 
prevention and technical services were performed at a 
cost of $58,532. Work was initiated on Cleveland, 
Texas, at a cost of $29,346, and Wharton, Texas, at a 
cost of $21,479. Work was completed on Beeville, 
Texas, at a cost of $171 and Kingsville, Texas, at a cost 
of $25,908. (See Table 15-K for Completed Flood Plain 
Information Reports.) 
30. RESEARCH AND DEVELOPMENT. 
Fiscal year cost was $1,082 for hydrologic studies. 
476

GALVESTON, TEX., DISTRICT 
TABLE 15-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
1. Aquatic Plant 
Control (Southwestern 
Division) 
1965 Act 
2. Brazos Island 
Harbor, Texas 
3. Cedar Bayou, 
Texas 
4. Clear Creek and 
Clear Lake, 
Texas 
5. Corpus Christi 
Ship Channel, 
Texas 
6. Double Bayou, 
Texas 
7. Freeport Harbor, 
Texas 
8. Galveston Harbor 
and Channel, 
Texas 
Total to 
Funding FY67 FY68 FY69 FY70 June 30, 1970 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
2,000 
991 
-5,000 
2,023 
386,543 
395,444 
88,826 
313,823 
1,153 
1,452 
32,925 
21,829 
510,554 
387,577 
671,684 
672,194 
43,901 
20,438 
344,000 
631,111 
-200,469 
817,825 
2,120,400 
1,135,192 
-58,107 125 
1,433 
60,000 
11,284 
-88 
988 
454,006 
459,706 
80,000 
17,601 
-13,962 
133 
572,002 
572,487 
2,000 
2,867 
-40,000 
3,163 
802,300 
795,139 
59,174 
59,424 
19,901 
29,624 
2,213,410 
1,613,234 
11,500 
3,976 
-24,663 
516 
499,151 
510,047 
-11,242 
453,631 
1,073,766 
2,123,340 
-275 
2,175 
671,215 
1,261,210 
20,000 
5,278 
435,979 
616,512 
240,000 -227,000 
17,466 1,216 
- 2,055 
782 2,856 
525,073 
530,519 
525,111 
525,162 
- - 
1,619,599 530,710 
1,632,936 532,144 
,000 485,000 1,020,000 
440 595,533 920,576 
144,000 
32,743 
10,471,4411 
10,471,1481 
10,915,0882 
10,910,7832 
1,463,826 
1,463,826 
52,663 
52,6633,s 
841,7064 
839,5104 
66,934 
66,934 
279,6796 
263,6226 
20,240,5087 
20,240,508 
24,863,7488 
24,832,7568 
3,576,684 
3,576,684 
34,810 
32,968 
341,0809 
341,0809 
1,973,73510 
1,973,73510,11 
8,777,35612 
8,773,37312 
8,935 
8,935 
26,136,86913 
26,136,86913,14 
28,322,17715 
28,316,69915 
8,082,255 
7,968,804 
477 
451-584 0-72-31 
552 49,000 
907 48,503 
-_-

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 15-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
9. Gulf Intracoastal 
Waterway Between 
Apalachee Bay, 
Fla., and the 
Mexican Border 
(Galv. Dist.) 
10. Houston Ship 
Channel, Texas 
11. Matagorda Ship 
Channel, Texas 
(Regular Funds) 
(Contributed 
Funds) 
12. Sabine-Neches 
Waterway, Texas 
(Regular Funds) 
(Contributed 
Funds) 
13. Texas City 
Channel, Texas 
14. Trinity River 
and Tributaries 
17. Buffalo Bayou 
and Tributaries, 
Texas 
_ 
Total to 
Funding FY67 FY68 FY69 FY70 June 30, 1970 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
Minor rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
-120,504 
329,830 
2,629,371 
2,763,935 
-19,627 
1,307 
485,000 
19,367 
944,944 
672,539 
425,000 
791,536 
956,657 
1,229,820 
-385,064 
2,079,971 
1,899,791 
2,127,050 
551,473 
203,023 
100,657 
15,691 
675,000 
1,042,088 
176,800 
253,974 
1,612,000 
1,492,100 
576,557 
81,403 
3,856,000 
4,774,772 
133,700 
99,929 
-31,700 
184,128 
4,576,102 
3,789,846 
-428,000 
36,807 
2,502,551 
1,642,904 
-3,000 
236 
1,379,617 
1,411,584 
-525,761 
236 
3,204,348 
3,250,894 
5,046,760 
4,380,381 
425,000 
378,504 
31,072 
46,763 
-4,584 
53,344 
421,184 
419,979 
3,146,534 
3,134,314 
162,814 
650,236 
3,695,000 
3,508,260 
160,500 
140,606 
- 523,000 
1,063 522,862 
1,877,000 653,962 
1,410,480 1,358,016 
361,557 357,000 
369,988 337,792 
1,468,000 1,069,000 
1,763,506 1,086,791 
140,000 146,815 
147,987 136,539 
723,500 - 
129,249 5,317 
2,144,302 2,813,142 
3,129,887 2,522,901 
25,000 -15,965 
8,174 1,683 
1,270,127 2,287,353 
1,851,663 2,806,664 
-2,665 - 
-1,659 - 
685,781 1,428,288 
675,972 1,443,300 
1,055 - 
1,459 - 
6,232,666 3,660,965 
6,468,525 2,823,610 
1,326,368 1,840,248 
3,488,992 1,945,374 
700,000 - 
748,148 86,479 
- 50,277 
- 40,461 
478 
43,620,28816 
43,028,01316,17 
54,868,37818 
54,466,214 
434,638 
434,638 
835,873 
835,873 
35,602,16319 
35,602,15919 
41,687,77820 
41,591,22420 
17,838,418 
17,838,418 
6,843,70921 
6,841,594 
12,056,08122 
12,056,08122 
47,895,01023 
46,566,167 
46,278,18524 
46,273,43624 
2,380,37825 
2,366,14325 
97,040 
87,224 
5,458,37226 
5,458,37226,27 
7,971,13728 
7,970,943 
726,158 
726,158 
11,625,57729 
11,317,02629,30 
3,222,26231 
3,194,396 
49,814,49432 
49,800,15832,33 
2,600,813 
2,592,414

TABLE 15-A (Continued) 
GALVESTON, TEX., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
18. Freeport and New Work 
Vicinity, Texas, Approp. 780,000 1,096,542 1,975,000 120,000 4,731,542 
Hurricane Flood Cost 333,563 644,343 1,854,356 999,373 4,553,887 
Protection. 
(Regular Funds) 
(Contributed New Work 
Funds) Contrib. 120,000 275,000 675,000 250,000 1,595,000 
Cost 158,576 221,222 720,624 256,983 1,545,92134 
19. Highland Bayou New Work 
Approp. 135,000 107,750 103,088 99,998 445,836 
Cost 29,263 56,105 161,112 87,686 334,166 
20. Liberty Local New Work 
Protection Approp. - 50,000 49,000 2 99,002 
Project, Texas Cost - 32,598 48,445 17,196 98,239 
21. Port Arthur and New Work 
Vicinity, Texas, Approp. 1,840,000 1,900,000 3,280,000 730,000 9,287,000 
Hurricane Flood Cost 1,056,811 1,370,468 2,706,619 1,829,214 8,354,892 
Protection 
(Regular Funds) 
(Contributed New Work 
Funds) Contrib. 400,000 100,000 - 450,000 1,450,000 
Cost 570,909 -237,324 634,068 365,889 1,392,66135 
22. Taylors Bayou, New Work 
Texas Approp. 100,000 150,000 7,000 14,000 271,000 
Cost 27,594 138,033 90,900 13,720 270,247 
23. Texas City and New Work 
Vicinity, Texas, Approp. 2,215,000 1,998,000 1,900,000 -269,000 14,863,000 
Hurricane-Flood Cost 1,376,941 2,495,749 1,897,940 1,395,229 14,190,923 
Protection 
(Regular 
Funds) 
(Contributed New Work 
Funds) Contrib. 46,500 1,030,000 595,000 650,000 5,297,000 
Cost 655,195 1,046,458 840,988 597,954 5,248,38136 
24. Vince and Little New Work 
Vince Bayous, Approp. -297,000 400,300 698,500 806,000 2,206,800 
Texas Cost 38,960 250,304 702,374 944,525 2,183,374 
1. Includes $675,855 for previous projects. Excludes 
$1,806,619 contributed funds, of which $123,361 represents 
previous projects and $1,683,258 is for existing project. 
2. Includes $24,341 for reconnaissance surveys. 
3. Includes $39,087 for previous projects. 
4. Includes $69,784 for previous projects. Includes $4,403 
for reconnaissance surveys. 
5. Excludes $12,576 expended from contributed funds. 
6. Includes $7,129 for reconnaissance surveys. 
7. Includes $1,372,534 for previous projects. Excludes 
$1,401,377 from contributed funds. 
8. Includes $62,452 for previous projects. Includes $41,063 
for reconnaissance surveys. Excludes $152,555 from contributed 
funds. 
9. Includes $5,861 for reconnaissance surveys. 
10. Includes $147,098 for previous projects. 
11. In addition $758,303 expended from contributed funds. 
12. Includes $4,551 for reconnaissance surveys. 
13. Includes $8,421,996 for previous projects. 
14. In addition, $3,580,275 expended from contributed 
funds. 
15. Includes $86,126 for previous projects and $11,877 for 
reconnaissance surveys. 
16. Includes $706,709 for previous projects. Includes Sec. 
107 project for Port Isabel Small Boat Basin as per 1st Ind. 
ENGCW-OM Mar 16, 1965; work performed in Fiscal Years 
1962-1966 total $46,559. 
17. In addition, $46,559 expended from contributed funds 
for Port Isabel Small Boat Basin. 
18. Includes $1,526,564 for previous projects, and $163,054 
for reconnaissance surveys. 
19. Includes $4,105,157 for previous projects. Excludes 
$2,574,179 contributed funds. 
20. Includes $1,213,142 for previous projects and $32,197 
for reconnaissance surveys. Excludes $200,000 from contributed 
funds. 
21. Includes $28,208 for reconnaissance surveys. 
22. Excludes $182,800 for contributed lands. 
23. Includes $5,180,832 for previous projects. 
24. Includes $2,379,677 for previous projects and $15,126 
for reconnaissance surveys. 
25. Includes $577,507 for previous projects. 
26. Includes $366,823 for previous projects. 
27. In addition, $28,741 expended from contributed funds. 
28. Includes $195,083 for previous projects and $5,787 for 
reconnaissance surveys. 
479

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COST AND FINANCIAL STATEMENT 
29. Includes $1,966,306 for previous projects. 
30. In addition, $66,000 expended from contributed funds. 
31. Includes $543,662 for previous projects and $9,596 for 
reconnaissance surveys. 
32. Federal funds of $4,400,000 repaid to Harris County 
Flood Control District. Cost and financial data formerly reported 
under advanced funds transferred to Federal funds and 
are included herein. 
33. In addition, $63,661 contributed funds expended for 
Brays Bayou Channel and $12,900 Federal funds and $19,104 
contributed funds expended for enlargement of Clodine Ditch. 
34. Excludes $340,603 estimated value of contributed lands 
and $65,140 for relocations. 
35. Excludes $1,853,873 estimated value of contributed 
lands and $334,585 for relocations. 
36. Excludes $1,002,729 estimated value of contributed 
lands. 
480 
TABLE 15-A (Continued)

GALVESTON, TEX., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 27, 1965 
July 3, 1930 
May 24, 1934 
(PWA) 
Aug. 30, 1935 
Aug. 26, 1937 
Mar. 2, 1945 
Mar. 2, 1945 
July 24, 1946 
May 17, 1950 
July 14, 1960 
July 3, 1930 
June 13, 1902 
Aug 30, 1935 
Mar. 2, 1945 
Mar. 3, 1899 
June 13, 1902 
Mar. 3, 1905 
Mar. 2, 1907 
Feb. 27, 1911 
AQUATIC PLANT CONTROL (See Section 1 of Text) 
Provides for control of progressive eradication of aquatic 
plant growth from the navigable waters and streams in the 
U.S. 
BRAZOS ISLAND HARBOR, TEXAS (See Section 2 of Text) 
Jetties and jetty channel, inside channels and basins. 
Local cooperation requirements modified to provide 
contribution of funds to cover cost of original dredging 
of all inside channels and basins. 
Deepen jetty channel to 31 feet and inner channels and 
Brownsville and Port Isabel turning basins to 28 feet. 
Enlarge Port Isabel turning basin. 
Deepen entrance channel to 35 feet; deepen to 33 feet 
channel across Laguna Madre; deepen to 32 feet channels 
from Laguna Madre to turning basins at Brownsville and 
Port Isabel; widen turning basins; and dredging present 
shallow-draft channel south of Port Isabel from railroad 
bridge to Laguna Madre and connecting channel to Port 
Isabel turning basin. 
Additional connecting channel between Port Isabel and 
Brownsville channels; and transfer shallow-draft channels 
at Port Isabel to Gulf Intracoastal Waterway. 
Deepen to 38 feet in outer bar channels and 36 feet in all 
other authorized channels and basins; extend existing 
turning basins at Brownsville and Port Isabel; and 
construct small-boat basin with a connecting channel next 
to Brownsville ship channel. 
Widen Brownsville Channel to 300 feet at a depth of 36 feet 
from former Goose Island passing basin to turning basin 
extension, thence at a width of 500 feet and same depth 
to turning basin proper, deepen to 36 feet an area in 
southeast corner of turning basin, maintain two existing 
basins of fishing harbor, and a connecting channel, and 
construct a third basin, with necessary connecting channel, 
and extend Brazos Island Harbor north jetty seaward 
1,000 feet. 
CEDAR BAYOU, TEXAS (See Section 3 of Text) 
Channel 10 feet deep and 100 feet wide from Houston Ship 
Channel to a point on bayou 11 miles above mouth. 
CLEAR CREEK AND CLEAR LAKE, TEXAS (See Section 4 of Text) 
A channel 4 feet deep and 50 feet wide. 
Enlargement of channel to 6 feet deep and 60 feet wide. 
Realinement, enlargement, and extension of channel to 
highway bridge near League City. 
CORPUS CHRISTI SHIP CHANNEL, TEXAS (See Section 5 of Text) 
Acquisition of old curved portion of north jetty previously 
constructed by private parties. 
Complete north jetty in accordance with builder's plans. 
Complete north jetty in accordance with builder's plans. 
Connect old curve jetty to St. Joseph Island, and construct 
south jetty. 
Dredge roadstead in Harbor Island Basin to 20 feet deep and 
construct 10,000 linear feet of stone dike on St. Joseph 
Island. 
481 
TABLE 15-B 
H. Doc. 251, 89th Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc. 16, 71st Cong., 2d sess. 
Rivers and Harbors Committee 
Doc. 10, 71st Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 32, 75th Cong., 1st sess. 
H. Doc. 335, 76th Cong., 
1st sess. 
H. Doc. 347, 77th Cong., 
1st sess. 
H. Doc. 627, 79th Cong., 
2d sess. 
H. Doc. 192, 81st Cong., 
1st sess. 
H. Doc. 428, 86th Cong., 
2d sess. 
S. Doc. 107, 71st Cong. 2d sess.1 
H. Doc. 449, 56th Cong. 
1st sess. 
H. Doc. 264, 73d Cong., 
2d sess. 
H. Doc. 319, 77th Cong., 
1st sess.1 
Specified in act. 
Specified in acts. 
Specified in act. 
Rivers and Harbors Committee 
Doc. 5, 59th Cong., 2d sess. 
H. Doc. 1094, 61st Cong., 
3d sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 15-B (Continued) 
Acts 
Mar. 4, 19132 
Sept. 23, 1922 
July 3, 19303 
July 3, 1930 
Aug. 30, 19354 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 30, 1935 
June 20, 1938 
Mar. 2, 1945 
June 30, 1948 
Sept. 3, 1954 
Sept. 3, 19545 
Sept. 3, 1954 
July 3, 1958 
July 3, 1958 
AUTHORIZING LEGISLATION 
Work Authorized 
Channel between jetties and Harbor Island Basin to 25 feet 
deep, extend jetties seaward, extend dike on St. Joseph 
Island 9,100 feet, and dredge approach channel 12 feet 
deep to town of Port Aransas. 
Dredging channel from Aransas Pass to Corpus Christi, 25 feet 
deep, 200 feet bottom width. 
Deepen entrance channel from gulf to Harbor Island 
and provide an inner basin at Harbor Island of reduced 
area but greater depth. 
Channel from Aransas Pass to Corpus Christi Channel with 
depth 30 feet. 
Enlarge all channels from gulf to western end of basin 
dredged by Humble Oil and Refining Co., at its docks 
on Harbor Island. 
Maintain channel and manuevering basin between breakwater 
and western shoreline of Corpus Christi Bay. 
Maintain 30-foot depth of approach channel, turning basin 
at Corpus Christi, Industrial Canal and turning basin 
at Avery Point. 
Maintain and deepen to 32 feet channel from deep water at 
Port Aransas to and including turning basin at 
Corpus Christi. 
Extend main turning basin at Corpus Christi westward 2,500 
feet at its present width and depth, deepen existing 
Industrial Canal and turning basin to 32 feet and extend 
this canal at a depth of 32 feet and general width of 150 
feet, westward along Nueces Bay shore to a turning basin 
32 by 900 feet, and 1,000 feet long near Tule Lake. 
Provide depth of 34 feet in all project channels and basins 
from Port Aransas to and including Tule Lake turning basin, 
for a width of 250 feet from Port Aransas to breakwater at 
Corpus Christi, for a width of 200 feet in Industrial Canal 
and in channel between Avery Point and Tule Lake turning 
basins, and widen Avery Point turning basin to 1,000 feet. 
Deepen entrance channel to 38 feet from gulf to outer end 
of jetty; 38 feet decreasing to 36 feet thence to station 
90, north jetty; and 36 feet in all other deep water 
channels and basins except 2,000-foot undredged part of 
inner basin at Harbor Island, and a width of 400 feet in 
channel from Port Aransas to Maneuvering basin at Corpus 
Christi. 
An anchorage basin 12 feet deep, from 300 to 400 feet wide, 
and 900 feet long in Turtle Cove at Port Aransas, Tex. 
Branch channel 32 by 150 feet, extending northerly from 
main channel in vicinity of Port Ingleside, along north 
shore of Corpus Christi Bay to Reynolds Metals Co. plant 
and a turning basin 32 feet deep and 800 feet square near 
plant in general vicinity of La Quinta, Tex. 
An entrance channel 36 by 400 feet on a tangent alinement 
from 400-foot channel in Corpus Christi Bay, near 
Corpus Christi breakwater, to flared approach channel to 
Corpus Christi turning basin. 
Deepen and widen LaQuinta Channel to 36 by 200 feet; enlarge 
LaQuinta turning basin to 36 by 800 by 1,000 feet; a flared 
entrance to channel; and widening at curves. 
Deepen entrance channel to 42 feet from gulf to outer end of 
jetty; 40 feet in all other deep-water channels and basins 
except undredged northward extension of inner basin at 
Harbor Island and branch channel to LaQuinta; and widen 
Industrial Canal to 400 feet with flared entrances to 
Corpus Christi and Avery Point turning basins. 
Documents 
H. Doc. 1125, 62d Cong., 
3d sess. 
H. Doc. 321, 67th Cong., 
2d sess. 
H. Doc. 214, 70th Cong., 
1st sess. 
Rivers and Harbors Committee 
Doc. 9, 71st Cong., 1st sess. 
Rivers and Harbors Committee 
Docs, 35, 72d Cong., 1st sess. 
and 40, 73d Cong., 2d sess. 
H. Doc. 130, 72d Cong., 
1st sess. 
Rivers and Harbors Committee 
Doc. 13, 74th Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc. 63, 74th Cong., 1st 
sess. 
H. Doc. 574, 75th Cong., 3d 
sess. 
H. Doc. 544, 78th Cong., 
2d sess. 
H. Doc. 560, 80th Cong., 
2d sess. 
H. Doc. 654, 81st Cong., 
1st sess. 
H. Doc. 89, 83d Cong., 
1st sess. 
H. Doc. 487, 83d Cong., 
2d sess. 
S. Doc. 33, 85th Cong., 
1st sess. 
H. Doc. 361, 85th Cong. 
2d sess. 
482

TABLE 15-B (Continued) 
GALVESTON, TEX., DISTRICT 
AUTHORIZING LEGISLATION 
Acts 1 Work Authorized Documents 
July 3, 1958 Channel 40 by 200 feet extending 2.2 miles from Tule Lake H. Doc. 361, 85th Cong. 
July 3, 1958 
July 26, 1968 
July 14, 1960 
(As amended by 
Oct. 25, 1965) 
Mar. 3, 1899 
Mar. 2, 1907 
Feb. 27, 1911 
Mar. 4, 1913 
Aug. 8, 1917 
Mar. 3, 19256 
July 3, 1930 
Aug. 30, 19357 
Aug. 30, 1935 
May 17, 1950 
July 3, 1958 
Oct 5, 1961 
Aug 5, 1886 
June 13, 1902 
Mar. 3, 1905 
turning basin to a turning basin 40 feet deep, 700 to 900 
feet wide, 1,000 feet long at Viola, Tex. 
Depth of 12 feet and a width of 100 feet in locally dredged 
Jewel Fulton Canal from LaQuinta Channel to a turning 
basin 12 by 200 by 400 feet, and assumption of maintenance 
by United States. 
Provides for a project depth of 45 feet in the existing 
deep-draft channels and basins, for construction of a new 
deep-draft turning point, for construction of a deep-draft 
mooring area and mooring facilities, and for widening of 
the channels and basins at certain locations. The Act also 
deauthorized the undredged northward extension of Inner 
Basin at Harbor Island and the undredged west turnout (Wye 
connection) between the LaQuinta Channel and the main 
channel of the waterway. 
DOUBLE BAYOU, TEXAS (See Section 6 of Text) 
7-foot channel. 
FREEPORT HARBOR, TEXAS (See Section 7 of Text) 
Dredging and other work necessary in judgment of Secretary 
of War for improving harbor; for taking over jetties and 
privately built works at mouth of river. 
Examination authorized. Work later confined to maintenance 
of jetties. 
Repairs to jetties and dredging. 
Construct a seagoing hopper dredge. 
Purchase of one 15-inch pipeline dredge and equipment, its 
operation for 3 years, operation of seagoing dredge one-half 
time for 3 years, and repairs to jetties. 
Diversion dam, diversion channel, and necessary auxiliary 
works. 
Maintenance of diversion channel at expense of local 
interest. 
Deepening channels and basins. 
Maintenance of present project dimensions of channels and 
basins at Federal expense. 
Deepen outer bar channel to 38 feet from gulf to a point 
within jetties, thence 36 feet in authorized channels 
to and including upper turning basin. 
Relocate outer bar channel on straight alignment with jetty 
channel and maintain Brazos Harbor entrance channel and 
turning basin (constructed by local interests). 
Modification of HD 1469. Revoking certain provisions of 
local cooperation. 
GALVESTON HARBOR AND CHANNEL, TEXAS (See 
Section 8 of Text) 
Construct 2 rubblestone jetties at entrance to Galveston 
Harbor. 
A channel 1,200 by 30 feet from Bolivar Roads (outer end of 
old inner bar near Fort Point) to 51st St.8 
Purchase or construct hydraulic pipeline dredge. 
2d sess. 
H. Doc. 361,85th Cong., 
2d sess. 
S. Doc. 99, 90th Cong., 
2d sess. 
Sec. 107, Public Law 86-645 
Specified in act. 
H. Doc. 1087, 60th Cong., 
2d sess. 
Specified in act. 
Specified in act. 
H. Doc. 1469, 63d Cong., 
3d sess. 
Rivers and Harbors Committee 
Doc. 10, 68th Cong., 2d sess. 
Rivers and Harbors Committee 
Doc. 18, 70th Cong., 
1st sess. 
Rivers and Harbors Committee 
Doc. 15, 72d Cong., 
1st sess. 
Rivers and Harbors Committee 
Docs. 15, 72d Cong., 1st 
sess., and 29, 73d Cong., 
2d sess. 
H. Doc. 195, 81st Cong., 
Ist sess. 
H. Doc. 433, 84th Cong., 
2d sess. 
P. L. 394, 87th Cong. 
H. Doc. 85, 49th Cong., 1st 
sess., and Annual Report, 
1886, p. 1311. 
H. Doc. 264, 56th Cong., 
2d sess. 
Specified in act. 
483

TABLE 15-B (Continued) 
Acts 
Mar. 2, 1907 
Mar. 2, 1907 
Mar. 2, 1907 
June 25, 19109 
July 27, 1916 
July 18, 1918 
Sept. 22, 1922 
Jan. 21, 1927 
Aug. 30, 193511 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 30, 1935 
April 4, 1938 
June 30, 1948 
May 17, 1950 
July 3, 1958 
Mar. 2, 1907 
Mar. 3, 1925 
Jan. 21, 1927 
Aug. 26, 1937 
June 20,193813 
June 20, 1938 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Work Authorized 
Extension of jetties to present project length and H. Dc 
construction and operation of a dredge. sess. 
Con 
2d se 
Extension of Galveston Channel from 51st to 57th Sts., with H. Dc 
construction and operation of a dredge. sess. 
Com 
2d so 
Extension of Galveston Channel from 51st to 57th Sts., with H. Dc 
depth of 30 feet and width of 700 feet. sess. 
Conditional extension of Galveston Channel between 51st and H. Dc 
57th Sts., 30 feet deep and 1,000 feet wide. sess. 
Extend seawall at Galveston from angle at 6th St. and H. Dc 
Broadway to vicinity of Fort San Jacinto. sess. 
Deepen harbor channel to 35 feet and widen to 800 feet. H. Dc 
sess. 
Further extension of seawall at Galveston to a junction with H. Dc 
south jetty; and repairing seawall in front of Fort Crockett sess. 
Reservation. 
Deepen Galveston Channel to 32 feet; and maintain Galveston H. Dc 
Harbor channels to dimensions of 800 feet wide, 35 feet , sess. 
deep on outer bar and 34 feet deep on inner bar.1 0 
Maintain State Highway Ferry Landing Channels to dimensions River 
of 12 by 100 feet. Doc 
Construct 13 groins along gulf shore from 12th to 61st Sts., H. D 
in city of Galveston at a limited cost of $234,000 (10 sess. 
groins constructed) 
Deepen Galveston Channel to 34 feet (Bolivar Roads to 43d River 
St.). 61, 
Deepen Galveston entrance channel to 36 feet. River 
Doc 
sess. 
Completion of project for construction of 13 groins. P.L. 
Deepen Galveston Harbor to 38 feet from gulf to a point H. Dc 
2 miles west of seaward end of north jetty; thence 36 feet 2d s 
to Bolivar Roads; revoking authority for maintenance of 
ferry channels; and Galveston channel to 36 feet deep from 
Bolivar Roads to 43d St. 
Construct extension of Galveston seawall from 61st St., H. D( 
southwesterly 16,300 feet along gulf shore. 1st s 
Deepen Galveston Harbor to 42 feet from gulf to a point H. D( 
2 miles west of seaward end of north jetty and 40 feet 2d s 
thence to Bolivar Roads. 
GULF INTRACOASTAL WATERWAY BETWEEN APALACHEE BAY, 
FLA., AND MEXICAN BORDER (GALV. DIST.) (See Section 9 
of Text)' 2 
Channel 4 by 100 feet from West Galveston Bay across H. Dc 
Chocolate Bay to 4 feet of water in Chocolate Bay. 1st s 
Channel 9 by 100 feet, Sabine River to Galveston Bay a H. Dc 
20-inch pipeline dredge. Such passing places, widening at 1st , 
bends, locks or guard locks and railway bridges over 
artificial cuts as are necessary. 
Channel 9 by 100 feet, Galveston Bay to Corpus Christi. H. Dc 
1st 
Maintenance of a flood-discharge channel in Colorado River. S. Co 
1st 
Channel 9 by 100 feet in San Bernard River, Texas. H. Dc 
sess. 
Channel in Colorado River, 9 by 100 feet, with basin. H. Dc 
3d s 
Documents 
ac. 340, 59th Cong., 2d 
, and Rivers and Harbors 
nmittee Doc. 11, 59th Cong., 
ess. 
oc. 340, 59th Cong., 2d 
, and Rivers and Harbors 
imittee Doc. 11, 59th Cong., 
ess. 
oc. 768, 59th Cong., 2d 
oc. 328, 61st Cong., 2d 
oc. 1390, 62d Cong., 3d 
oc. 758, 65th Cong., 2d 
oc. 693, 66th Cong., 2d 
oc. 307, 69th Cong., 1st 
s and Harbors Committee 
. 31, 72d Cong., 1st sess. 
oc. 400, 73d Cong., 2d 
s and Harbors Committee Doc. 
74th Cong., 1st Sess. 
s and Harbors Committee 
. 57, 74th Cong., 1st 
463, 75th Cong. 
oc. 561, 80th Cong., 
ess. 
oc. 173, 81st Cong., 
sess. 
oc. 350, 85th Cong., 
ess. 
oc. 445, 56th Cong., 
sess. 
oc. 238, 68th Cong., 
sess. 
oc. 238, 68th Cong., 
sess. 
mmittee print, 75th Cong., 
sess. 
oc. 640, 75th Gong., 3d 
oc. 642, 75th Cong., 
ess. 
484

TABLE 15-B (Continued) 
GALVESTON, TEX., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 20, 1938 H. Doc. 564, 75th Cong., 
3d sess. 
H. Doc. 641, 75th Cong., 3d 
sess. 
H. Doc. 643, 75th Cong., 3d 
sess. 
June 20, 1938 
June 20, 1938 
July 23, 1942 
Mar. 2, 1945 
Mar. 2, 19459 
Mar. 2, 1945 
Mar. 2, 1945 
Mar. 2, 194514 
July 24, 1946 
July 24, 1946 
May 17, 1950 
May 17, 1950 
May 17, 1950 
July 12, 1952 
Sept. 3, 19549 
Sept. 3, 1954 
Sept. 9, 1959 
July 14, 1960 
485 
Channel 9 by 100 feet from Palacios through Trespalacios 
and Matagorda Bay. 
Channel 9 by 200 feet from main channel to harbor at Rockport 
and improve harbor to 9-foot depth. 
Channel 6 by 100 feet from main channel to Aransas Pass, Tex. 
Enlarge waterway Sabine River to Corpus Christi and extend 
to Brownsville, Tex., providing depth of 12 feet and width 
of 125 feet throughout. 
Channel 6 by 60 feet from GIWW to a point in Chocolate Bayou 
near Liverpool. 
Channel 6 feet deep and 60 feet wide from main channel near 
Port O'Connor, Tex., into Barroom Bay. 
Enlarge channel from main channel to Aransas Pass, Tex., 
providing a depth of 9 feet and width of 100 feet. 
Channel 12 by 125 feet from main channel to Red Fish Landing, 
Tex., with basin. 
Channel 12 feet deep and 125 feet wide from main channel to 
vicinity of Harlingen, Tex., via Arroyo Colorado, with 
basin. 
Fill a portion of shallow-draft channel adjacent to Port 
Isabel turning basin, construct a channel to connect 
shallow-draft channel with main channel near shoreline 
of Laguna Madre, and enlarge shallow-draft channel west of 
this connection, all of 12 feet deep and bottom width of 
125 feet. 
Reroute main channel to north shore of Red Fish Bay between 
Aransas Bay and Corpus Christi Bay; deepen tributary 
channel from Port Aransas to Aransas Pass, Tex., 12 feet 
and extend basin at same depth. 
Deauthorized 6 by 60 foot channel in Chocolate Bayou and 
reauthorized the 4 by 100-foot channel. 
Alternate channel across South Galveston Bay between Port 
Bolivar and Galveston causeway. 
"Red Fish Landing" changed to "Port Mansfield, Tex." 
Incorporate as part of Intracoastal Waterway a channel 9 by 
100 feet from main channel via Seadrift to point on 
Guadalupe River 3 mi. above Victoria, Tex., authorized by 
River and Harbor Act of 1945. 
Small craft harbor 9 by 200 by 1,000 feet at Seadrift with 
an entrance channel 9 by 100 ft. 
Widen tributary channel between Port Aransas and Aransas Pass, 
Tex., to 125 feet; straighten and widen to 125 feet 
connecting channel to Conn Brown Harbor, and maintain 
Conn Brown Harbor at Federal expense, all to 12 feet 
deep. 
Improve channels and basins comprising channel to Port 
Mansfield constructed in part by Federal Government 
and in part by local interests; constructing turnout 
curves at Gulf Intracoastal Waterway intersection and 
bend easing at entrance to turning basin; construct 
parallel jetties at gulf entrance; maintenance of locally 
dredged jetty channel 16 by 250 feet; and maintenance of 
small craft basin. 
Entrance channel 7 feet deep by 75 feet wide from main 
channel to Gulf of Mexico to inside shoreline at Port 
Isabel, Tex., an inner channel 6 feet deep by 50 feet wide 
from entrance channel to East Harbor Basin, and an 
irregular-shaped harbor basin 6 feet deep having a surface 
area of about 7 acres. 
H. Doc. 230, 76th Cong., 1st. 
sess. (See P.L. 675, 77th 
Cong.) 
H. Doc. 337, 76th Cong., 
1st sess. 
H. Doc. 428, 76th Cong., 1st 
sess. 
H. Doc. 383, 77th Cong., 1st 
sess. 
S. Doc. 248, 78th Cong., 2d 
sess. 
H. Doc. 402, 77th Cong., 1st 
sess. (See Public Law 14, 
79th Cong.) 
H. Doc. 627, 79th Cong., 
2d sess. 
H. Doc. 700, 79th Cong., 
2d sess. 
H. Doc. 768, 80th Cong., 2d 
sess. 
H. Doc. 196, 81st Cong., 1st 
sess. 
P.L. 516, 81st Cong. 
P.L. 527, 82nd Cong., 2d 
sess. 
H. Doc. 478, 81st Cong., 
2d sess. 
H. Doc. 376, 83d Cong., 
2d sess. 
S. Doc. 11, 86th Cong., 
1st sess. 
Sect. 107, P.L. 645, 86th 
Cong.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 15-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 23, 1962 Improve main channel 16 feet deep and 150 feet wide from H. Doc. 556, 87th Cong., 2d 
Oct. 23, 1962 
Oct. 23, 1962 
Oct. 27, 1965 
Aug. 13, 1968 
Mar. 5, 1905 
Mar. 2, 1919 
Mar. 3, 1925 
July 3, 1930 
Aug. 30, 193511 
Aug. 30, 1935 
Mar. 2, 1945 
Mar. 2, 1945 
Mar. 2, 1945 
June 30, 1948 
Sabine River to Houston Ship Channel; with two relocations; 
relocate main channel in Matagorda Bay and Corpus Christi 
Bay; and maintain existing Lydia Ann Channel. 
Deepen and widen channel to Palacios; construct two protective 
breakwaters; maintain and deepen existing basins; and 
deepen, enlarge, and maintain existing approach channel to 
basin No. 2. 
Eliminates requirement of local interests to construct bridge 
at mile 29.2 turning basin at Victoria; and maintain 
turning basins at Victoria and Seadrift; provide: Federal 
construction of vertical-lift railroad bridge at Missouri- 
Pacific Railroad mainline crossing, mile 29.2; construction 
and future maintenance of basin near Victoria, Texas, and 
maintenance of basin constructed by local interests at 
Seadrift, Tex. 
Modify existing Federal navigation project to provide a 
channel extending from Gulf Intracoastal Waterway through 
Chocolate Bay and Chocolate Bayou to project channel mile 
8.2 thence to a turning basin near channel mile 13.2 and 
for salt water barrier in Chocolate Bayou about 3.7 miles 
upstream from basin (channel mile 16.9). 
Entrance channel 15 feet deep and 200 feet wide at the mouth 
of Colorado River Chan. protected by an east jetty, 3,500 
feet long extending to 12-foot depth and a west jetty 
2,900 feet long extending to 5-foot contour; make channel 
12 feet by 100 feet from gulf shore to Matagorda, incl 
recreation facil, a turning basin 12 feet by 300 feet wide 
and 1,450 feet long, and a new diversion chan 250 feet wide 
and varying in depth from 20 to 23 feet incl a closure dam 
across the present river channel. 
HOUSTON SHIP CHANNEL, TEXAS (See Section 10 of Text) 
Easing or cutting off sharp bends and construction of a 
pile dike. 
l s 5 
A channel 30 feet deep, widen bend at Manchester and enlarge 
turning basin. 
A light-draft extension of channel to mouth of White Oak 
Bayou. 1 6 
Widen channel through Morgan Point and to a point 4,000 
feet above Baytown and widen certain bends. 
Deepen to 32 feet in main channel and turning basin, 
and a 400-foot width through Galveston Bay. 
Deepen to 34 feet in main channel and widen from Morgan 
Point to turning basin. 
Branch channel 10 by 60 feet behind Brady Island. 
Widen channel from Morgan Point to lower end of Fidelity 
Island with turning points at mouth of Hunting Bayou 
and lower end of Brady Island. 
Widen channel from lower end of Fidelity Island to Houston 
turning basin and dredge off-channel silting basins. 
Deepen to 36 feet from Bolivar Roads to and including main 
turning basin at Houston, Texas, including turning points 
at Hunting Bayou and Brady Island. 
sess. 
H. Doc. 504, 87th Cong., 2d 
sess. 
H. Doc. 288, 87th Cong., 2d 
sess. 
H. Doc. 217, 89th Cong., 1st 
sess. 
S. Doc. 102, 90th Cong., 2d 
sess. 
Rivers and Harbors Committee 
Doc. 35, 61st Cong., 2d 
sess. 
H. Doc. 1632, 65th Cong., 3d 
sess. 
H. Doc. 93, 67th Cong., 1st 
sess. 
H. Doc. 13, 71st Cong., 
1st sess. 
Rivers and Harbors Committee 
Doc. 28, 72d Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc. 58, 74th Cong., 1st 
sess. 
H. Doc. 226, 76th Cong., 1st 
sess. 
H. Doc. 256, 76th Cong., 1st 
sess. 
H. Doc. 737, 79th Cong., 2d 
sess. 
H. Doc. 561, 80th Cong., 2d 
sess. 
486

GALVESTON, TEX., DISTRICT 
TABLE 15-B (Continued) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
July 3, 195817 
July 14, 1960 
Oct. 27, 1965 
June 25, 1910 
Aug. 30, 1935 
Aug. 26, 1937 
Mar 2, 1945 
Mar. 2, 1945 
July 3, 1958 
July 3, 1958 
July 25, 1912 
Sept. 22, 1922 
Sept. 22, 1922 
March 3, 1925 
Jan. 21, 1927 
Aug. 30, 193511 
Aug. 30, 193511 
Aug. 30, 1935 
Deepen to 40 feet from Bolivar Roads to Brady Island, 
construct Clinton Island turning basin, a channel 
8 by 125 feet at Five Mile Cut, and improve shallowdraft 
channel at Turkey Bend. 
Barbour Terminal at Morgan Point. 
Restoring existing locally dredged channel from mile 
0 to 0.34 to 36 feet deep and dredging a 15-12 ft. 
channel from mile 0.34 to 2.81, in Greens Bayou. 
MATAGORDA SHIP CHANNEL, TEXAS (See Section 11 of Text) 
Channel to Port Lavaca, Texas 7 feet deep and 80 feet 
bottom width. 
Extend 7-foot channel to shoreline of Lavaca Bay at 
mouth of Lynns Bayou. 
Deepen and widen channel to present project dimensions. 
Extend channel 6 by 100 feet from Port Lavaca via Lavaca Bay, 
Lavaca and Navidad Rivers to Red Bluff, a distance of 20 
miles. 
A harbor of refuge 9 feet deep near Port Lavaca and an 
approach channel 100 feet wide and equal depth. 
Deepen to 12 feet and widen to 125 feet Port Lavaca Channel 
and approach channel to harbor of refuge; deepen to 12 feet 
Port Lavaca turning basin and basins at harbor to refuge. 
An entrance channel 38 by 300 feet, a channel 36 by 200 feet, 
22 miles long across Matagorda and Lavaca Bays to Point 
Comfort, Texas, a turning basin 36 feet deep and 1,000 
feet square at Point Comfort, and dual jetties at entrance 
from gulf. 
SABINE-NECHES WATERWAY, TEXAS (See Section 12 of Text) 
Existing project dimensions of jetties, a 26-foot channel 
through Sabine Pass, Port Arthur Canal and Port Arthur 
turning basin; and a 26-foot turning basin at Port Arthur. 
A depth of 25-feet in Sabine-Neches Canal, Neches River to 
Beaumont and Sabine River to Orange, including cutoffs 
and widening channels. 
Deepen channels to 30 feet from gulf to Beaumont, with 
increased widths and an anchorage basin in Sabine Pass. 
Deepen Port Arthur east and west turning basins and approach 
channel to 30 feet. Take over and deepen to 30 feet 
channel connecting west turning basin with Taylors Bayou 
turning basin. For a 30-foot depth in channel from mouth 
of Neches River to cutoff in Sabine River near Orange. 
Removal of guard lock in Sabine-Neches Canal. 
Widen Sabine Pass and jetty channel, Port Arthur Canal, and 
Sabine-Neches Canal. For dredging 2 passing places in 
Sabine-Neches Canal, easing of bends, removal and reconstructing 
Port Arthur field office, extending Beaumont 
turning basin upstream 200 feet above new city wharves, 
and an anchorage basin in Sabine Pass. 
A depth of 32 feet in channels from gulf to Beaumont turning 
basin, including all turning basins at Port Arthur. 
Deepen channels to 34 feet with increased widths from gulf 
to Beaumont turning basin. 
Construct suitable permanent protective works along Sabine 
Lake. Maintain Taylors Bayou turning basin. 
H. Doc. 350, 85th Cong., 2d 
sess. 
Sec. 107, Public Law 86-645. 
H. Doc. 257, 89th Cong., 1st 
sess. 
H. Doc. 1082, 60th Cong., 2d 
sess. 
Rivers and Harbors Committee 
Doc. 28, 74th Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 37, 75th Cong., 1st 
sess. 
H. Doc. 314, 76th Cong., 1st 
sess. 
H. Doc. 731, 79th Cong., 2d 
sess. 
H. Doc. 131, 84th Cong., 1st 
sess. 
H. Doc. 388, 84th Cong., 2d 
sess. 1 
H. Doc. 773, 61st Cong., 2d 
sess. 
H. Doc. 975, 66th Cong., 3d 
sess. 
S. Doc. 152, 67th Cong., 2d 
sess. 
H. Doc. 234, 68th Cong., 1st 
sess. 
H. Doc. 287, 69th Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc. 27, 72d Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc. 12, 74th Cong., 1st 
sess. 
Specified in Act. 
487 
Documents

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Acts Work Authorized 
Aug. 26, 1937 Maintain channel from Sabine River to Orange Municipal 
wharf. 
Aug. 26, 1937 
June 20, 193818 
Oct. 17, 1940 
Mar. 2, 1945 
Mar. 2, 1945 
Mar. 2, 1945 
July 24, 194619 
July 24, 194620 
July 24, 1946 
May 17, 1950 
Sept. 3, 194321 
Dredging 500 feet from eastern end of Harbor Island and 
abandonment of channel south and west of Harbor Island. 
Increased widths of channels from gulf to Beaumont turning 
basin and channel connecting Port Arthur west turning 
basin and Taylors Bayou turning basin, deepen Beaumont 
turning basin and Beaumont turning extension to 34 feet; 
and dredge a new cutoff from Smith's Bluff cutoff to 
McFadden Bend. 
Abandon Orange turning basin; dredge a channel 25 by 150 
feet, suitably widened on bends to highway bridge, and 
dredge a cutoff channel opposite Orange. 
Extend Beaumont turning basin upstream 300 feet. 
Widen Port Arthur west turning basin to 600 feet. 
Dredge a channel from Beaumont turning basin to vicinity 
of Pennsylvania Shipyard. 
Deepen Sabine Pass outer bar channel to 37 feet, Sabine 
Pass jetty channel to 36 feet at inner end, deepen to 
36 feet Sabine Pass Channel, Port Arthur Canal, Port 
Arthur east and west turning basins, Taylors Bayou 
turning basin, and channel from Port Arthur west turning 
basin to Taylors Bayou turning basin, and channel from 
Port Arthur west turning basin to Taylors Bayou turning 
basin, deepen to 36 feet and widen to 400 feet Sabine- 
Neches Canal from Port Arthur Canal to mouth of Neches 
River except through Port Arthur bridge; deepen Neches 
River channel from mouth to Beaumont turning basin to 36 
feet with widening to 350 feet from Smith's Bluff to 
Beaumont turning basin; deepen junction area on Neches 
River at Beaumont turning basin to 36 feet; and widen 
Sabine-Neches Canal between Neches and Sabine Rivers to 
150 feet. 
Improve Cow Bayou, Texas, by construction of a channel 100 
feet wide and 13 feet deep extending from navigation channel 
in Sabine River to a point 0.5 mile above county bridge 
at Orangefield, Texas, with a turning basin. 
Improve Adams Bayou, Texas, to provide a channel 12 feet deep 
and 100 feet wide extending from 12-foot depth in Sabine 
River to first county highway bridge across bayou. 
Deepen to 36 feet and widen to 400 feet the Sabine-Neches 
Canal near Port Arthur bridge; reconstruct Port Arthur 
Bridge and relocate Port Arthur field office. 
Rectification of certain reaches of existing Sabine Pass 
Channel, Sabine-Neches Canal, and Neches River and Sabine 
River Channel; widen to 350 feet entrance channel to Port 
Arthur turning basins; widen curve at junction of Port 
Arthur and Sabine-Neches Canals; relocate and enlarge 
Sabine Pass anchorage basin to 34 by 1,500 by 3,000 feet; 
widen to 200 feet Sabine-Neches Canal from mouth of Neches 
River to mouth of Sabine River and Sabine River Channel to 
upper end of existing project at Orange, except for channel 
around Harbor Island at Orange; deepen to 30 feet Sabine 
River Channel from cutoff near Orange municipal slip to 
upper end of project, except around Harbor Island; and 
enlarge area at entrance to Orange municipal slip to 
provide a maneuvering basin. 
Documents 
Rivers and Harbors Committee 
Doc. 3, 75th Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc. 20, 75th Cong., 1st 
sess. 
H. Doc. 581, 75th Cong., 
3d sess. 
S. Doc. 14, 77th Cong., 
1st sess. 
H. Doc. 685, 76th Cong., 
3d sess. 
S. Doc. 60, 77th Cong., 
1st sess. 
S. Doc. 158, 77th Cong., 
2d sess. 
H. Doc. 571, 79th Cong., 
2d sess. 
H. Doc. 702, 79th Cong., 
2d sess. 
H. Doc. 626, 79th Cong., 
2d sess. 
H. Doc. 174, 81st Cong., 
1st sess. 
S. Doc. 80, 83d Cong., 
2d sess. 
488 
TABLE 15-B (Continued)

TABLE 15-B (Continued) 
GALVESTON, TEX., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 23, 1962 
Mar. 4, 1913 
July 3, 1930 
Aug. 30, 193522 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 26, 1937 
June 30, 1948 
July 14, 1960 
Mar 3, 1905 
July 25, 1912 
Sept. 22, 1922 
Mar. 2, 1945 
July 24, 1946 
Oct. 23, 1962 
Oct. 27, 1965 
Improve outer bar channel to 42 and 40 feet for all inland 
channels to Port Arthur and Beaumont; width of 500 feet 
in Port Arthur Canal and 400 feet in Neches River Channel 
to Beaumont with three turning points in Neches River; a 
channel, 12 by 125 feet, extending in Sabine River to Echo; 
and replace an obstructive bridge at Port Arthur, Texas. 
Deauthorization of uncompleted portion of channel between 
Port Arthur west turning basin and Taylors Bayou turning 
basin and enlargement of entrance channel to Port Arthur 
turning basins. 
TEXAS CITY CHANNEL, TEXAS (See Section 13 of Text) 
A channel 300 by 30 feet and construct a pile dike 28,200 
feet long north to channel. 
A harbor 800 by 30 feet at Texas City, and construct a 
rubble-mound dike. 
Extension of rubble-mound dike to shoreline. 
Deepen channel and harbor to 32 feet. 
Deepen channel and harbor to 34 feet. 
Extend harbor, 1,000 feet southward 800 by 34 feet. 
Deepen channel and harbor to 36 feet, widen channel to 400 
feet and harbor to 1,000 feet and changing name of project 
to "Texas City Channel, Tex." 
Deepen channel and turning basin to 40 feet and construct 
16-foot Industrial Barge Canal. 
TRINITY RIVER AND TRIBUTARIES, TEXAS (See Section 14 of 
Text) 
Anahuac Channel 
6-foot channel to Liberty 
Abandon improvements above Liberty and terminate all improvements 
by lock and dam, leaving a 6-foot channel from 
Liberty to mouth. 
Provides for a navigable channel from the Houston Ship 
Channel near Red Fish Bar in Galveston Bay to Liberty, 
Texas, with project depth of 9 feet deep and 200 feet 
wide in Galveston and Trinity Bays to the mouth of 
Trinity River and 9 feet deep and 150 feet wide in the 
river section, with a turning basin at Liberty. 
Modification of the project to provide for a channel 9 feet 
deep and 150 feet wide from the Houston Ship Channel near 
Red Fish Bar in Galveston Bay extending along the east 
shore of Trinity Bay to the mouth of the Trinity River at 
Anahuac, including protective spoil embankment on the bay 
side of the channel in lieu of the 9 by 200-foot channel 
in Galveston and Trinity Bays. 
Provides for the multiple-purpose Wallisville Reservoir, 
including a navigation lock in the Wallisville dam at 
Channel Mile 28.30 and advancement of the Channel to 
Liberty from one mile below Anahuac (Mile 23.2) to the 
Texas Gulf Sulphur Company's slip at Channel Mile 35.8, 
and incorporation into existing project Anahuac Channel 
and mouth of Trinity River Projects. 
Reevaluation of navigation benefits. Participation in 
high-level bridge contracts on State Highways No. 190 
and No. 105. 
H. Doc. 553, 87th Cong., 
2d sess. 1 
H. Doc. 1390, 62d Cong., 
3d sess. 
H. Doc. 107, 71st Cong., 
1st sess. 
Rivers and Harbors Committee 
Doc. 4, 73d Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 46, 73d Cong., 2d 
sess. 
Rivers and Harbors Committee 
Doc. 62, 74th Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc. 47, 75th Cong., 1st 
sess. 
H. Doc. 561, 80th Cong., 2d 
sess. 
H. Doc. 427, 80th Cong., 2d 
sess. 
- 
H. Doc. 989, 66th Cong., 
3d sess. 
H. Doc. 403, 77th Cong., 1st 
sess. 
H. Doc. 634, 79th Cong., 
2d sess. 
H. Doc. 215, 87th Cong., 1st 
sess. 
H. Doc. 276, 89th Cong., 
1st sess. 
489

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 15-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 20, 1938 
Sept. 3, 1954 
Oct. 27, 1965 
Oct. 23, 1962 
Oct. 27, 1965 
Oct. 27, 1965 
Oct. 23, 1962 
Oct. 27, 1965 
July 3, 1958 
Aug. 13, 1968 
Oct. 23, 1962 
490 
BUFFALO BAYOU AND TRIBUTARIES, TEXAS (See Section 17 of 
Text) 
Light draft channel from Houston Turning Basin in Buffalo H. Doc. 456, 75th Cong., 
Bayou to the mouth of White Oak Bayou at Main Street. 2d sess. 
Barker and Addicks Reservoirs on Buffalo Bayou and clearing, H. Doc. 250, 83rd Cong., 
straightening, enlarging and lining of Buffalo, Brays, 2d sess. 1 
and White Oak Bayous. 
Extend upper limits of White Oak Bayou upstream about 2.1 H. Doc. 169, 89th Cong., 
miles from BRI RR bridge to mouth of Cole Creek. 1st sess. 
FREEPORT AND VICINITY, TEXAS (HURRICANE-FLOOD PROTECTION) 
(See Section 18 of Text) 
Improvements to 42.8 miles of existing levees, 2.1 miles of H. Doc. 495, 87th Cong., 
new levee and 2 interior drainage pumping plants. 2d sess. 1 
HIGHLAND BAYOU, TEXAS (See Section 19 of Text) 
Enlargement and rectification of Highland Bayou Channel, H. Doc. 168, 89th Cong., 
construction of diversion dam, and diversion channel. 1st sess. 1 
LIBERTY LOCAL PROTECTION PROJECT (See Section 20 of Text) 
Construction of 59,400 feet of levee and provisions for H. Doc. 276, 89th Cong., 
interior drainage facilities. 1st sess. 
PORT ARTHUR AND VICINITY, TEXAS (HURRICANE-FLOOD PROTECTION) 
(See Section 21 of Text) 
Raising and reconstructing 6.3 miles of existing seawall; H. Doc. 505, 87th Cong., 
constructing 0.3 mile of new seawall, 20.3 miles new levees 2d sess. 1 
and four pumping plants; and raising and improving 7.5 
miles of existing levees. 
TAYLORS BAYOU, TEXAS (See Section 22 of Text) 
Enlarging and rectifying channels; construction of diversion H. Doc 206, 89th Cong., 
channel; a salt water gate; enlargement of GIWW 1.3 miles 1st sess.1 
and alteration of State Highway 87 bridge. 
TEXAS CITY AND VICINITY, TEXAS (HURRICANE-FLOOD PROTECTION) 
(See Section 23 of Text) 
Construction of improvements for control of storm tides, H. Doc. 347, 85th Cong., 
consisting of new and enlarged levees and floodwalls 2d sess. 1 
approximately 14.1 and 2.1 miles in length; related 
drainage and stoplog structures; a navigation opening and 
pumping plants. 
LaMarque-Hitchcock extensions. H. Doc. 187, 90th Cong., 
1st sess. 
VINCE AND LITTLE VINCE BAYOUS, TEXAS (See Section 24 of Text) 
Enlarging and rectifying channel of Vince Bayou and Little H. Doc. 441, 87th Cong., 
Vince Bayou upstream for a total of 11.5 miles for both 2d sess. 1 
streams.

1. Contains latest published maps. 
2. Extension of north jetty 1,950 feet and south jetty 1,265 
feet considered inactive. 
3. Dredging 2,000- by 650-foot northerly extension of inner 
basin deauthorized. 
4. Included in Public Works Administration program Sept. 
6, 1933 and Feb. 16, 1935. 
5. West leg of Wye junction with main channel deauthorized. 
6.- Construction of lock in diversion dam at local expense 
considered inactive. 
7. Dredging upper .5 mile of channel to vicinity of Stauffer 
Chemical plant considered inactive. Included in Public Works 
Administration program Sept. 6, 1933. 
8. Dredging 46th to 51st Sts. inactive. 
9. Inactive. 
10. Deepening 43d to 57th Sts. inactive. 
11. Previously authorized Sept. 6, 1933 by Public Works 
Administration. 
12. H. Doc. 230, 76th Cong., 1st sess. and project documents 
contain latest published maps. 
TABLE 15-C OTHER AUTHORI 
13. Dredging upper 3.5 miles inactive. 
14. Dredging upper 5 miles to be restudied. 
15. Construction of pile dike considered inactive. 
16. Considered inactive from Hill Street Bridge to mouth of 
White Oak Bayou. 
17. Deepening channel to 40 feet from Southern Pacific Slip 
to Brady Island is inactive. 
18. Complete widening of channel between Port Arthur west 
turning basin and Taylors Bayou turning basin deauthorized by 
1962 R&H Act. 
19. Complete deepening of channel between Port Arthur west 
turning basin and Taylors Bayou turning basin deauthorized by 
1962 R&H Act. 
20. Channel extension above Cow Bayou turning basin near 
Orangefield considered inactive. 
21. Widening to 350 feet entrance channel to Port Arthur 
turning basins deauthorized by 1962 R&H Act. 
22. Previously authorized Sept. 6, 1933 by Public Works 
Administration. 
ZED NAVIGATION PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Aquatic Plant Control (1958 and 1962 River 
and Harbor Acts) 9 1967 38,2521 
Bastrop Bayou, Tex. 2 '3 1931 9,920 27,129 
Brazos River, Tex., from Velasco to Old 
Washington3 1924 216,9894 223,010 
Channel to Port Bolivar, Texas5 1969 133,9256 754,3587 
Corpus Christi, Tex., Channel to Navy 
Seaplane Base, Encinal Peninsula9 1968 1,194,344 26,467 
Dickinson Bayou, Texas9 1954 33,942 61,3748 
East Bay Bayou (Hanna Reef), Tex.3 1922 2,476 847 
Johnson Bayou, La. 9 ' 1 0 1933 2,261 54,042 
Little Bay, Texas1 1 1957 - 1,65613 
Oyster Creek, Texas 9'1 2 1922 6,942 7,556 
1. Excludes $1,672 work contributions. 
2. 1950 River and Harbor Act (H. Doc. 768, 80th Cong., 2d 
sess.) revoked 6-foot Channel for Bastrop Bayou as authorized 
by 1945 River and Harbor Act (H. Doc. 337, 76th Cong., 1st 
sess.), and reauthorized only that portion of existing 4- by 
100-foot project lying westward of Gulf Intracoastal Waterway. 
3. Inactive. 
4. Includes $123,676 from previous project. 
5. Uncompleted portion considered inactive. 
6. Includes $48,711 for previous projects. 
7. Includes $46,101 for previous projects and $2,311 for 
reconnaissance surveys. 
8. Reconnaissance surveys included, $3,821. 
9. Completed. 
10. Channel adequate for existing commerce. 
11. Aransas County Navigation District, Rockport, Tex., 
constructed project as authorized by 1950 River and Harbor Act 
(H. Doc. 114, 81st Cong., 1st sess.) in 1955 under Department 
of Army permit. 
12. No commerce reported. 
13. Reconnaissance surveys included $1,651. 
491 
TABLE 15-B (Continued) 
GALVESTON, TEX., DISTRICT 
AUTHORIZING LEGISLATION

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 15-D OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Clear Creek, Texas 1969 - 
Colorado River, Matagorda, Texas2 1963 273,757 
Lavaca-Navidad Rivers, Texas: 
Hallettsville project 1961 256,043 
General channel projects1 1952 21,086 
Mill Creek, Texas1 1952 24,753 
San Diego Creek, Alice, Texas2 1963 135,175 
Tranquitas Creek, Kingsville, Texas2 1956 130,239 
1. Inactive. 
2. Completed. 
492

GALVESTON, TEX., DISTRICT 
TOTAL COST OF EXISTING PROJECT TO JUNE 30, 1970 
See 
Section Project Funds New Work Maintenance Rehabilitation Total 
in Text 
1. Aquatic Plant Control Regular 
(Southwestern Division) Public Works 
1965 Act Contributed 
Total cost of project 
2. Brazos Island Harbor, Regular 
Texas Public Works 
Contributed 
Total cost of project 
3. Cedar Bayou, Texas 
5. Corpus Christi Ship 
Channel, Texas 
7. Freeport Harbor, 
Texas 
8. Galveston Harbor 
and Channel, Texas 
9. Gulf Intracoastal 
Waterway between 
Apalachee Bay, 
Florida, and the 
Mexican Border 
(Galveston District) 
10. Houston Ship Channel, 
Texas 
12. Sabine-Neches Waterway, 
Texas 
Regular 
Public Works 
Contributed 
Total cost of project 
Regular 
Public Works 
Contributed 
Total 
Value of useful work 
performed 
Contributed Land 
Total cost of project 
Regular 
Public Works 
Contributed 
Total 
Value of useful work 
performed 
Total cost of project 
Regular: 
Channel 
Seawall 
Public Works 
Contributed 
Total cost of project 
Regular 
Public Works 
Contributed 
Total 
Value of useful work 
performed 
Contributed Land 
Total cost of project 
Regular 
Public Works 
Contributed 
Total cost of project 
Regular 
Public Works 
Contributed 
Total 
Value of useful work 
Contributed Land 
Total cost of project 
$ 32,800 $ - 
$ 32,800 
$ 6,946,733 $10,910,783 
2,848,560 
1,683,258 - 
$11,478,551 $10,910,783 
$ 13,576 $ 769,726 
12,576 
$ 26,152 $ 769,726 
$18,543,687 $24,770,304 
324,287 - 
1,401,377 152,555 
$20,269,351 $24,922,859 
$ 1,716,695 $ - 
276,720 - 
$22,262,766 $24,922,859 
$ 1,710,062 $ 8,773,373 
116,575 - 
758,303 
$ 2,584,940 $ 8,773,373 
360,249 - 
$ 2,945,189 $ 8,773,373 
$ 8,960,664 $28,053,605 
8,754,209 163,847 
- 13,121 
3,580,275 
$21,295,148 $28,230,573 
$41,854,827 $52,939,650 
466,477 - 
46,559 - 
$42,367,863 $52,939,650 
$ 395,000 - 
139,776 - 
$42,902,639 $52,939,650 
$28,884,070 $40,378,082 
2,612,932 - 
1,365,000 - 
$32,862,002 $40,378,082 
$40,021,683 $43,893,759 
1,363,652 - 
1,788,636 87,224 
$43,173,971 $43,980,983 
$ 32,000 $ - 
116,760 
$43,322,731 $43,980,983 
$ - $ 32,800 
$ 32,800 
$1,463,826 $19,321,342 
- 2,848,560 
1,683,258 
$1,463,826 $23,853,160 
$ - $ 783,302 
- 12,576 
$ - $ 795,878 
$3,576,684 $46,890,675 
324,287 
- 1,553,932 
$3,576,684 $48,768,894 
- $ 1,716,695 
- 276,720 
$3,576,684 $50,762,309 
$ 8,935 $10,492,370 
- $ 116,575 
- 758,303 
$ 8,935 $11,367,248 
- 360,249 
$ 8,935 $11,727,497 
$7,372,831 $44,387,100 
595,973 9,514,029 
- 13,121 
- 3,580,275 
$7,968,804 $57,494,525 
$1,270,511 $96,064,988 
- 466,477 
- 46,559 
$1,270,511 $96,578,024 
- 395,000 
- 139,776 
$1,270,511 $97,112,800 
$ - $69,262,152 
- 2,612,932 
- 1,365,000 
- $73,240,D84 
- $83,915,442 
- 1,363,652 
- 1,875,860 
- $87,154,954 
$ - $ 32,000 
116,760 
$ - $87,303,714 
493 
451-584 0-72-32 
TABLE 15-E

TABLE 15-E (Cont'd) 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TOTAL COST OF EXISTING PROJECT TO JUNE 30, 1970 
See 
Section Project Funds New Work Maintenance Rehabilitation Total 
in Text 
13. Texas City Channel, Regular $ 4,955,253 $ 7,775,860 $ 726,158 $13,457,271 
Texas Public Works 136,296 - - 136,296 
Contributed 28,741 - - 28,741 
Total cost of project $ 5,120,290 $ 7,775,860 $ 726,158 $13,622,308 
14. Trinity River and Regular $ 9,350,720 $ 2,650,734 $ - $12,001,454 
Tributaries, Texas Public Works - - - - 
Contributed - - - - 
Total cost of project $ 9,350,720 $ 2,650,734 $ - $12,001,454 
494

GALVESTON, TEX., DISTRICT 
TABLE 15-F CHANNEL DIMENSIONS 
Adopted Project Dimensions (feet) 
See Depth Bottom 
Section Project Section of Waterway Below Mean Width Length 
in Text Low Tide 
2. Brazos Island 
Harbor, Texas 
3. Cedar Bayou, 
Texas 
4. Clear Creek and 
Clear Lake, 
Texas 
5. Corpus Christi 
Ship Channel, 
Texas 
Outer Bar and Jetty Channel 
Padre Island to Long Island 
Long Island to Goose Island 
Goose Island to Turning Basin Extension 
Turning Basin Extension 
Brownsville Turning Basin 
Port Isabel Channel via East Turnout 
West Wye, from Brownsville Channel 
Port Isabel Turning Basin 
Fishing Harbor: 
West Basin 
Middle Basin 
East Basin1 
Connecting Channel 
Entrance Channel 
Houston Ship Channel to first bend 
above mouth2 
Galveston Bay to Clear Creek 
North Fork Channel 
Channel through Clear Creek and 
Clear Lake 
Aransas Pass outer bar channel 
Aransas Pass jetty channel 
Inner basin at Harbor Island 
Channel to Port Aransas 
Port Aransas turning basin 
Anchorage basin at Port Aransas 
Inner Basin to Corpus Christi 
turning basin 
Corpus Christi turning basin 
Industrial Canal 
Avery Point turning basin 
Channel to Chemical turning basin 
Chemical turning basin 
Tule Lake channel 
Tule Lake turning basin 
Viola Channel 
Viola turning basin 
Channel to La Quinta 
La Quinta turning basin 
Turning Point at La Quinta 
channel junction 
Jewel Fulton Canal 
Jewel Fulton turning basin 
Mooring Area at Ingleside: 
Mooring Area (a) 
Mooring Area (b) 
495 
38-36 
36 
36 
36 
36 
36 
36 
36 
36 
15 
15 
15 
15 
15 
10
7
7
7 
300 
200 
200 
300 
500 
1,000 
200 
200 
1,000 
370-305 
370-305 
370 
270 
100 
100 
75 
60 
60 
700 
600 
730-1,720 
100 
200 
300400 
600400 
800 
400 
975 
400 
1,2003 
300 
1,200 
300-350 
1,200 
300400 
1,200 
1,2009 
100 
200 
47 
45 
45 
12 
12 
12 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
12 
12 
45 
45 
13,471 
11,029 
50,496 
16,794 
7,140 
2,670 
7,144 
4,401 
1,300 
1,470 
1,200 
1,470 
1,230 
700 
17,950 
2,900 
3,430 
46,470 
9,750 
5,113 
1,550 
770 
200 
900 
109, 337 
5,423 
5,733 
1,150 
3,444 
1,690 
16,260 
1,000 
9,650 
1,000 
29,426 
800 
4,096 
400 
150 
150

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 15-F (Cont'd) CHANNEL DIMENSIONS 
Adopted Project Dimensions (feet) 
See Depth Bottom 
Section Project Section of Waterway Below Mean Width Length 
in Text Low Tide 
6. Double Bayou, 
Texas 
7. Freeport Harbor, 
Texas 
8. Galveston Harbor 
and Channel, 
Texas 
10. Houston Ship 
Channel, Texas 
Channel from the mouth of Double 
Bayou to the 7-foot contour in 
Trinity Bay 
Channel from mouth of Double Bayou 
up the West Fork of Double Bayou 
Outer Bar Channel 
Jetty Channel 
Channel to Brazosport T.B. 
Brazosport turning basin 
Channel to Upper Basin 
Upper turning basin 
Channel to Stauffer Chemical Plant 
Stauffer turning basin 
Brazos Harbor Channel 
Brazos Harbor turning basin 
Entrance Channel 
Outer Bar Channel 
Inner Bar Channel 
Anchorage Basin 
Bolivar Roads Channel 
Galveston Channel: 
Bolivar Roads Channel to 43rd St. 
43rd St. to 51st St.4 
51st St. to 57th St.4 
Bolivar Roads to Morgan Point 
Morgan Point to Boggy Bayou 
Boggy Bayou to Greens Bayou 
Greens Bayou to Sims Bayou 
Hunting Bayou turning point 
Clinton Island turning basin 
Sims Bayou to Southern Pacific Slip 
Southern Pacific Slip to Houston 
turning basin 
Houston turning basin 
Upper turning basin 
Brady Island Channel 
Barbour Terminal Channel 
Turning basin 
Five Mile Cut Channel 
Light Draft Channel: 
Upper turning basin to Jensen Drive 
Turkey Bend Channel 
Jensen Drive to White Oak Bayou4 
Greens Bayou Channel: 
Mile 0 to Mile 0.347 
Mile 0.34 to Mile 1.65 
Mile 1.65 to Mile 2.81
496 
7
7 
38 
36 
36 
36 
36 
36 
30 
30 
30 
30 
42 
42 
40 
36 
40 
36 
32 
32 
40 
40 
40 
40 
40 
40 
40 
40 & 366 
36 
36 
10 
16 
16
8 
10 
10 
10 
36 
15 
12 
125 
100 
300 
200 
200 
700 
375 
600 
200 
500 
200 
500 to 600 
800 
800 
800 
(avg) 2,875 
800 
1,200 
1,200 
1,000 
400 
400 
300 
300 
9 0 0 -1 ,0 0 0 s 
800s 
300 
300 
400-1,000 
150 
60 
100 
1,100 
125 
60 
60 
60 
175 
100 
100 
20,600 
10,560 
16,000 
4,400 
5,751 
667 
8,423 
600 
6,090 
500 
2,690 
675 
25,000 
8,764 
16,864 
(avg) 9,763 
5,048 
20,700 
-
- 
138,154 
67,385 
12,465 
27,800 
1,375 
1,592 
2,881 
15,571 
3,100 
1,000 
4,800 
7,800 
1,000 
10,000 
21,898 
4,400 
7,900 
1,800 
-

GALVESTON, TEX., DISTRICT 
TABLE 15-F (Cont'd) CHANNEL DIMENSIONS 
Adopted Project Dimensions (feet) 
See Depth Bottom 
Section Project Section of Waterway Below Mean Width Length 
in Text Low Tide 
11. Matagorda Ship 
Channel, Texas 
12. Sabine-Neches 
Waterway 
Outer Bar and Jetty Channel 
Channel to Point Comfort 
Approach Channel to turning basin 
Turning basin 
Channel to Port Lavaca 
Lynn Bayou turning basin 
Channel to Harbor of Refuge 
North-South Basin 
East-West Basin 
Channel to Red Bluff 
Sabine Bank Channel 
Sabine Pass Outer Bar Channel 
Sabine Pass Jetty Channel 
Sabine Pass Anchorage Basin 
Sabine Pass Channel 
Port Arthur Canal 
Entrance to Port Arthur turning 
basins 
Port Arthur East turning basin 
Port Arthur West turning basin 
Channel connecting Port Arthur West 
turning basin and Taylors Bayou turning 
basin 
Taylors Bayou turning basin 
Sabine-Neches Canal, Port Arthur Canal 
to Neches River 
Turning Point, Mile 25 
Neches River, Mouth to Maneuvering Area 
at Beaumont turning basin 
Turning Point, Vic. Mile 30 
Turning Point, Vic. Mile 37.2 
Turning Point, Vic. Mile 40 
Channel Extension, Vic. Mile 40 
Maneuvering Area at Beaumont turning 
basin 
Beaumont turning basin 
Beaumont turning basin extension 
Beaumont turning basin extension to end 
of project channel, vicinity Bethlehem 
Steel Company 
Sabine-Neches Canal, Neches River to 
Sabine River 
Sabine River, Mouth to Foot of Green Ave. 
Orange turning basin 
Orange Municipal Slip 
Old Channel around Harbor Island 
Channel to Echo 
Adams Bayou 
Cow Bayou 
Orangefield turning basin 
38 
36 
36 
36 
12 
12 
12 
12 
12
6 
42 
42 
40 
40 
40 
40 
40 
40 
40 
40 
40 
40 
40 
40 
40 
40 
40 
36 
40 
34 
34 
30 
30 
30 
30 
30 
25 
12 
12 
13 
13 
300 
300-2008 
200-300 
1,000 
125 
27-342 
125 
300 
250 
100 
800 
800 
800-500 
1,500 
500 
500 
200-665 
420 
600 
200-250 
17,000 
110, 274 
5,949 
1,000 
21,775 
532 
10,166 
1,682 
1,750 
106,900 
77,800 
18,000 
21,488 
3,000 
29,624 
32,578 
1,500 
1,765 
1,610 
3,020 
150, 1,000 3,470 
400 59,369 
900 9 
400 
1,0009 
1,0009 
1,000 9 
350 
Irregular 
500 
350 
200 
200 
200 
Irregular 
200 
150-200 
125 
100 
100 
300 
96,838 
700 
1,200 
1,204 
1,500 
2,132 
3,864 
23,000 
49,938 
1,550 
2,435 
12,634 
10o 
8,900 
37,00011 
500 
497

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
CHANNEL DIMENSIONS 
1. Constructed by local interests. 
2. Channel from first bend above mouth. 
3. Includes portion of main channel. 
4. Inactive. 
5. Includes 300-foot channel width. 
6. Deepening Houston Ship Channel to 40 feet from Southern Pacific Slip 
to Brady Island and construction of 26,000 lineal feet of pile dike in upper 
Galveston Bay is in inactive category. 
7. Improved by local interests. 
8. 300 feet through Matagorda Peninsula. 
9. Diameter. 
10. 4.6 miles authorized. 
11. Upper 0.7 mile is in inactive category. 
498 
TABLE 15-F (Cont'd)

GALVESTON, TEX., DISTRICT 
GULF INTRACOASTAL WATERWAY BETWEEN 
APALACHEE BAY, FLA., AND MEXICAN BORDER 
EXISTING PROJECT DIMENSIONS PROVIDED FOR IN TRIBUTARY CHANNELS 
TABLE 15-G (See Section 9 of Text) 
Depth in Adopted Project Dimensions 
Tributary Channel FeeMt eBaenl ow Bottom Length WidthMiles Feet 
Low Tide in Feet 
Chocolate Bayou Channel: 1 
12-foot channel via East Turnout2 12 125 8.2 - 
West Turnout3 12 125 - 4,240 
9-foot channel4 9 100 - 
Turning basin 9 600 - 
San Bernard River Channel s 9 100 26.0 
Colorado River Channel6 9 100 15.5 
Turning basin 9 400 - 500 
Silting basin 9 150 - 5,122 
Mouth of Colorado River 7 
Navigation Channel, GIWW to Gulf 12 100 - 
Turning basin at Matagorda 12 350 - 
Channel to Palacios 8 12 125 16.1 
Turning basin No. 1 12 200 - 700 
Turning basin No. 2 12 300 - 1,150 
Connecting channel 12 150-480 - 450 
Channel to Barroom Bay 9 6 60 - 
Channel to Victoria: 
Main Channel, via East Turnout channel 9 100 34.7 
Turning basin 9 600 (avg) - 800 (avg) 
West Turnout channel 9 100 - 4,256 
Channel to Seadrift via South Turnout 9 100 2.0 - 
channel 
Turning basin 9 250 - 300 
North Turnout channel from Channel 9 100 0.5 - 
to Victoria 
Harbor of Refuge at Seadrift 9 9 200 - 
Channel to Rockport 9 200 2.1 - 
Turning basin 9 475 - 1,255 
Channel to Aransas Pass 12 125 6.1 - 
Turning basin 12 300 - 2,212 
Channel to Conn Brown Harbor 12 125 0.2 - 
Conn Brown Harbor 12 300 - 600 
Channel to Port Mansfield 10 
Entrance Channel 16 250 0.8 - 
Approach Channel to Hopper Dredge T.B. 16 100 0.4 - 
Hopper Dredge Turning Basin 16 300 - 300 
Channel across Padre Island & Laguna Madre 14 100 7.7 - 
Turnout Channels, east side of Main Channel 
GIWW: 
North turnout 12 100 - 2,980 
South turnout 12 100 - 2,957 
Channel West side of Main Channel, GIWW 12 100 0.4 - 
to P. T. of turnout channels 
499

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
GULF INTRACOASTAL WATERWAY BETWEEN 
APALACHEE BAY, FLA., AND MEXICAN BORDER 
EXISTING PROJECT DIMENSIONS PROVIDED FOR IN TRIBUTARY CHANNELS 
TABLE 15-G (Cont'd) (See Section 9 of Text) 
Depth in Adopted Project Dimensions 
Tributary Channel FeeMt eBaenlo w BWotitdotmh M iles Length Feet 
Low Tide in Feet 
Turnout Channels, west side of Main Channel, 
GIWW: 
North turnout 12 200 - 2,957 
South turnout 12 200 - 2,980 
Channel from P. T. of Turnout Channels to 14 125 0.6 
Approach Channel to Main T. B. 
Approach Channel to main turning basin 14 200 0.3 
Main turning basin 14 400 - 1,250 
Turning basin extension 14 1,000 - 580 
Small craft basin 8 160 - 860 
Shrimp basin 12 350 - 1,450 
Arroyo Colorado via south turnout from Main 12 12511 25.812 
Channel, GIWW 
Turning basin near Rio Hondo 12 400 - 500 
North turnout from Main Channel 12 200 - 3,499 
Port Isabel Side Channels 12 125 0.8 
12 60 0.3 
12 125 0.3 
Port Isabel Small Boat Harbor 
Entrance Channel 7 75 - 7,672 
Harbor Channel 6 50 - 1,457 
Boat Basin 6 72-501 - 1,308 
1. Includes the construction of a salt water barrier at mile 16.9. 
2. Constructed by local interests. East turnout channel constructed 
10 feet deep by 150 feet wide. 
3. Constructed by local interest. 
4. Authorized to mile 13.4. 
5. Authorized to mile 31 above mouth (channel mile 29.4). 
Upper 3.4 miles are in inactive category. 
6. Includes a discharge channel from Matagorda, Texas, to the 
gulf which was dredged by local interests in 1939. (Maintenance will 
be discontinued upon completion of improvements authorized by 
R&H Act of 1968.) 
7. Also provides for a dam across the present discharge channel, 
a new 250-foot wide by 20 to 23 feet deep discharge channel into 
Matagorda Bay, and a 15-foot deep by 200-foot wide entrance channel 
with parallel jetties from the gulf shoreline into the Gulf of 
Mexico. East jetty to be 3,500 feet long and west jetty 2,900 feet 
long. 
8. Includes two protective breakwaters at entrance to turning 
basin. 
9. Inactive. 
10. Also provides for two stone jetties at the gulf entrance about 
1,000 feet apart. (North jetty constructed 2,300 feet long and south 
jetty constructed 2,270 feet long.) 
11. South turnout is 200 feet wide. 
12. Authorized to mile 31. Mile 25.8 to mile 31 to be restudied. 
500

GALVESTON, TEX., DISTRICT 
DREDGING OPERATIONS 


Brazos Island Harbor, 
Texas 

Brownsville Channel 

Jul.1-24, 1969

475,752

$136,993

Jetty and Sea Bar Channels 
(U.S. hopper dredge 
A. Mackenzie) 

Jul. 4-31, 1969

217,940

$87,550

Brownsville Channel 

Mar. 10-Apr. 18, 1970

1,186,564

$287,994

Cedar Bayou, Texas


Cedar .Bayou Channel 

Jan. 2-23, 1970

209,896

$38,909

Corpus Christi Ship 
Channel, Texas 

Outer Bar and Jetty Channels 
(U. S. hopper dredge 
A. Mackenzie) 

Jul. 1-3, 1969

80,468

$15,450

Bay Channel and Tule 
Lake Channel 

Jul. 1-Aug. 11, 1969

1,300,013

$302,021


Channel to La Quinta 

Jan. 21-Feb. 22, 1970

899,465

$195,409

Port Aransas Channel 

Mar. 29-Apr. 2, 1970

6,459

$6,644

Outer Bar and Jetty Channels 
(U. S. hopper dredge 
A. Mackenzie) 

Jun. 8-11 and Jun. 30, 1970

84,400

$19,565


Freeport Harbor, 
Texas 

Jetty Channel to 0.6 mile 
upstream from Brazosport 
Turning Basin 

Jul. 1-Aug. 5, 1969

661,844

$245,926

Entrance Channel (U. S. 
hopper dredge A. 
Mackenzie) 

Dec. 1-30, 1969

629,818

$113,750

Entrance Channel (U. S. 
hopper dredge A. 
Mackenzie) 

May 18-Jun. 7, 1970

529,262

$95,550

Galveston Harbor and 
Channel, Texas 


Entrance, Outer Bar and 
Inner Bar Channels 

Dec. 31, 1969 - Mar. 22, 1970

2,277,000

$373,100


Gulf Intracoastal 
Waterway Between 
Apalachee Bay, Fla., 
and Mexican Border 
(Galv. Dist.) 

Main Channel, Port Isabel 
to Mud Flats

Jul. 1-Aug. 5, 1969

462,172

$59,879

 
Main Channel, San Antonio 
Bay to Aransas Bay 

Jul. 1-Oct. 9, 1969

1,003,707

$118,431

Main Channel, Brazos 
River crossing and vicinity 

Jul. 1-15, 1969

152,591

$51,916

Colorado River channel 
mile 6.4 to mile 15.5 
and silting basin 

Jul. 23-Dec. 12, 1969

773,395

$244,192


Main Channel, Freeport 
to Cedar Lakes and San 
Bernard River Channel 

Oct. 22, 1969 - Mar. 26, 1970

1,321,935

$282,354

Port Mansfield Entrance 
Channel (U. S. hopper 
dredge A. Mackenzie)

Jun. 16-23, 1970

63,448

$33,670

 
Main Channel, Colorado 
River to Matagordo Bay 

Dec. 10, 1969 - Jun. 4, 1970

1,858,537

$244,552

Portion of GIWW, Main 
Channel and Barge Mooring 
Basin (vicinity Corpus 
Christi Bay)

Jan. 21-27, 1970

92,380

$32,997

 
Main Channel, Texas City 
Junction to Galveston 
Causeway and Alternate 
Route 

Apr. 16-Jun. 30, 1970

603,924

$96,400

Main Channel, Corpus 
Christi Bay to Mud Flats 

Apr. 2-June 22, 1970

1,482,718

$227,356


Main Channel, High Island 
to Port Bolivar

Jun. 10-30, 1970

192,000

$77,690
 


REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 15-H (Cont'd) DREDGING OPERATIONS 
Cubic Yards 
Section Project Description Period of Material Cost 



Gulf Intracoastal 
Waterway Between 
Apalachee Bay, Fla., 
and Mexican Border 
(Galv. Dist.)

Main Channel, Port Isabel 
to Arroyo, Colorado, and 
Tributary Channel to 
Harlingen 

Jun. 6-30, 1970

176,000

$39,700

 Houston Ship Channel, 
Texas 

The 5-Mile Cut Channel 

Jul. 1-7, 1969

64,386

$9,777

Red Fish Reef to Morgan 
Point and Constructing 
Reference Line Structures 

Jul. 1-Dec.3, 1969

6,207,936

$1,080,541

Greens Bayou to Sims 
Bayou 

Aug. 7-Oct. 19, 1969

1,199,153

$810,252

Atkinson Island Barge 
Mooring Basin 

Jan. 2-23, 1970

121,649

$20,899

Morgan Point to Lynchburg 
and Barbour Terminal 
Channel

Apr. 28-Jun. 30, 1970

1,667,685

$590,510

Matagorda Ship Channel, 
Texas 

Channel to Port Lavaca, 
Harbor of Refuge and 
Channel to Red Bluff 

Jul. 1-Nov. 22, 1969

1,113,873

$124,045

Outer Bar, Jetty Channel 
and Peninsula Channel 
(U. S. hopper dredge 
A. Mackenzie)

Oct. 3-Nov. 30, 1969

1,003,000

$236,600

 Matagorda Peninsula to 
Point Comfort 

Feb. 10-May 23, 1970

4,378,266

$758,549

Entrance Channel (U. S. 
hopper dredge A. Mackenzie)

Apr. 20-May 17, 1970

492,087

$127,400
 
Sabine-Neches Waterway, 
Texas (New work) 

Sabine Bank Channel 
(U. S. hopper dredge McFarland) 

Jul. 7-Aug. 27, 1969; 
Oct. 17-Nov. 7, 1969;
Dec. 12, 1969 - Apr. 19, 1970; and May 18-Jun. 29, 1970

6,252,387

$1,517,900

Outer Bar and Jetty Channels 
(U. S. hopper dredge 
McFarland)

Apr.27-30, 1970

198,100

$147,150

Outer Bar and Jetty Channels 
(U. S. hopper dredge 
A. Mackenzie)

Apr. 15-19, 1970

338,669

$22,750

Sabine-Neches Waterway, 
Texas 
(Maintenance) 

Port Arthur Turning 
Basins and Junction 
Area 

Aug. 31-Dec. 6, 1970

1,926,922

$700,161

Upper Reach, Sabine Pass Channel and Lower Reach, Neches River Channel

Mar. 15-Jun. 30, 1970

3,065,589

$536,116

Jetty Channel and Outer 
Bar Channel (U. S. 
hopper dredge A. 
Mackenzie)

Mar.23-Apr. 19, 1970

1,566,768

$104,650 


Outer Bar Channel (U. S. 
hopper dredge McFarland) 

Apr.20-26, and May 1-17, 1970

2,038,660

$41,850

Texas City Channel, Texas 


Texas City Channel and 
Turning Basin 

Feb. 4-Apr. 17, 1970

3,048,230

$494,427
 
 


]

GALVESTON, TEX., DISTRICT 
TABLE 15-H (Cont'd) DREDGING OPERATIONS 


Trinity River and Tributaries, Texas

Anahuac Channel

May 4-27, 1970

126,652

$31,232


Channel to Liberty Mile 9.9 to 10.3 and Mile 24.4 to 38.3 

Sep. 25-Dec. 19, 1969

375,100

$217,281


Channel to Liberty Mile 33.3 to 36.3 

May 30-Jun. 30, 1970

85,186

$45,513





1. Excludes $40,461 contributed funds for spoil area levees and spillways. 
BUFFALO BAYOU AND TRIBUTARIES, TEXAS 



TABLE 15-I (See Section 17 of Text) 
Name Nearest Height of Type of Reservoir Estimated 
City Dam (feet) Structure Capacity Cost 
Addicks Dam Houston, Texas 49 Earthfill 204,500 acre-feet $5,248,000 
detention 
Barker Dam Houston, Texas 37 Earthfill 207,000 acre-feet 4,530,000 
detention 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 685, 
84th Congress, as amended (preauthorization) 
TABLE 15-J (See Section 27 of Text) 
Fiscal Year 
Study Costs 
Chiltipin Creek, at Sinton, Texas $51,568 
Coleto Creek, at Yorktown, Texas 3,456 
Los Olmos Creek, at Rio Grande City, Texas 1,162 
Palo Blanco and Cibolo Creeks, at Falfurrias, Texas 47,810 
FLOOD PLAIN INFORMATION REPORTS 
TABLE 15-K (See Section 29 of Text) 
Location Requesting Agency Dated Completed1 Federal Cost 
Flood Plain Information Report, City of Dickinson May 1968 $26,464 
Dickinson, Texas 
Flood Plain Information Report, City of Orange July 1968 22,180 
Orange, Texas 
Flood Plain Information Report, City of Victoria July 1968 25,834 
Victoria, Texas 
Flood Plain Information Report, City of Alice October 1969 24,017 
Alice, Texas 
Flood Plain Information Report, City of Beeville October 1969 23,995 
Beeville, Texas 
Flood Plain Information Report, City of Kingsville June 1970 25,908 
Kingsville, Texas 
1. Month and year report was furnished to the requesting agency. 
503

FORT WORTH, TEX., DISTRICT* 
District includes that portion of Texas south of Red 
River drainage basin exclusive of drainage basin of Rio 
Grande and its tributaries above and including Pecos 
River; exclusive of drainage basins of all short streams 
arising in coastal plain of Texas and flowing into the 
Gulf of Mexico, including entire basins of Buffalo 
Bayou, San Jacinto, San Bernard, Lavaca, Navidad, 
Mission, and Arkansas Rivers; exclusive of lower basins 
of major streams flowing into the gulf as follows: Sabine 
River, Tex. and La., downstream from U.S. Highway 
190 crossing at Bon Wier, Tex.; Neches River 
downstream from Town Bluff gaging station; Trinity 
River downstream from Texas State Highway 45 
crossing at Riverside, Tex.; Brazos River downstream 
from confluence with Navasota River; Colorado River 
downstream from gaging station at Austin; Guadalupe 
River downstream from confluence with San Marcos 
River; San Antonio River downstream from confluence 
with Escondido Creek; Nueces River downstream 
from confluence with Frio and Atascosa Rivers; 
and exclusive of Agua Dulce, San Fernando, and 
Olmos Creek basins draining into Baffins Bay and 
coastal area south thereof to Rio Grande and east of 
western boundary of Starr County, Tex. District also 
includes that portion of western Louisiana in Sabine 
River drainage basin upstream from U.S. Highway 
190 crossing at Bon Wier, Tex., and portion of eastern 
New Mexico included in drainage basins of Brazos and 
Colorado Rivers. 
IMPROVEMENTS 
Navigation Page 
1. Neches and Angelina Rivers, Tex. ........ 506 
2. Town Bluff Dam-B. A. Steinhagen 
Lake, Tex ............ ............................ 506 
3. Trinity River and tributaries, Tex. ....... 506 
4. Trinity River Project, Tex. .................. 507 
5. Other authorized navigation projects .... 508 
Flood Control 
6. Abilene Channel Improvement, Tex. .... 508 
7. Bardwell Lake, Tex. ............................. 509 
8. Belton Lake, Tex. .................................. 509 
9. Benbrook Lake, Tex ......................... 510 
10. Big Fossil Creek, Tex. .......................... 510 
11. Brazos River Basin, Tex. ..................... 510 
12. Canyon Lake, Tex ............................. 511 
13. Duck Creek Channel Improvement ...... 511 
14. Elm Fork Floodway, Tex. .................... 511 
15. Fort Worth Floodway (Clear Fork) 
T ex. ........................................................ 512 
16. Fort Worth Floodway (West Fork) 
T ex ......................................................... 512 
17. Grapevine Lake, Tex. ........................... 512 
18. Guadalupe and San Antonio Rivers, 
T ex. ......................................................... 513 
19. Hords Creek Lake, Tex .................... 513 
20. Lakeview Lake, Tex. ............................ 513 
21. Lewisville Dam, Tex. ............................ 514 
22. Lavon Lake, Tex. ..................................... 514 
23. Lavon Lake Modification and East 
Fork Channel Improvement, Tex. ..... 515 
Flood Control (cont.) Page 
24. Navarro Mills Lake, Tex. ....................... 515 
25. Proctor Lake, Tex .............................. 516 
26. Rutledge Hollow Creek, Tex. ................ 516 
27. San Angelo Lake, Tex ...................... 516 
28. San Antonio Channel Improvement, 
T ex ............................................. .............. 5 17 
29. San Gabriel River, tributary to Brazo 
River, Tex ............ ............................ 517 
30. Somerville Lake, Tex ......................... 518 
31. Stillhouse Hollow Dam, Tex. ................. 518 
32. Trinity River and tributaries, Tex. ....... 518 
33. Waco Lake, Tex ................................. 519 
34. Inspection of completed flood control 
projects .............................................. 519 
35. Scheduling flood control reservoir 
operations ............ ............................. 519 
36. Other authorized flood control projects 520 
37. Flood control work under special 
authorization .. ................... 520 
Multiple-Purpose Projects Including Power 
38. Sam Rayburn Dam and Reservoir, 
39. WhiLtnaekye , Te.x... .............................. 520 
39. Whitney Lake, Tex .................................. 520 
40. 
41. 
42. 
General Investigations 
Surveys .............................................. 
Collection and study of basic data ....... 
Research and development ................... 
521 
521 
521 
'* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
505

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
NAVIGATION 
1. NECHES AND ANGELINA RIVERS, 
TEX. 
Location. Neches River rises 60 miles southeast of 
Dallas, Tex., and flows generally southeast 416 miles to 
Sabine Lake 4 miles east of Port Arthur, Tex. Angelina 
River flows southeast 200 miles to its confluence with 
Neches River 126 miles above its mouth. Authorized 
features are located as follows: Rockland Dam on 
Neches River about 3 miles west of Rockland, Tex.; 
Sam Rayburn Dam on Angelina River about 10 miles 
northwest of Jasper, Tex.; Dam A on Neches River 
about 4 miles west of Horger, Tex.; Town Bluff Dam 
on Neches River about one-half mile north of Town 
Bluff, Tex. (See Geological Survey base map, Northeast 
Texas, scale 1:500,000.) 
Existing project. Provides for dams and lakes, at 
Rockland and Sam Rayburn damsites on Neches and 
Angelina Rivers, respectively, which will give a large 
measure of flood protection to agricultural lands in 
lower river valley and to city of Beaumont, Tex., 
reduce hazards to navigation resulting from floods, and 
provide a regulated flow in lower river to supply 
municipal, agricultural, and industrial demands. In 
addition, these proposed projects will permit development 
of a large amount of firm power and afford 
opportunities for recreation. Plan also provides for 
construction of Dam A, on Neches River below 
Rockland Dam, for development of power and Town 
Bluff Dam, below confluence of Angelina and Neches 
Rivers, to regulate daily fluctuations in discharge from 
turbines in upper projects and to develop a limited 
amount of power. Construction of Rockland and Dam 
A Lakes and power facilities at Town Bluff Dam-B. 
A. Steinhagen Lake is to be deferred until justified by 
future conditions. Estimated cost for new work, revised 
in 1970 for Town Bluff Dam-B. A. Steinhagen Lake 
and Sam Rayburn Dam and Reservoir and in 1954 for 
Dam A and Rockland Lakes, is $124,255,000 including 
$5 million non-Federal cost. (See Table 16-B for flood 
control works included in comprehensive plan.) 
2. TOWN BLUFF DAM-B. A. 
STEINHAGEN LAKE, TEX. 
Location. Dam is on Neches River about 12.4 miles 
below mouth of Angelina River, one-half mile north of 
Town Bluff, Tex., and 93 river miles north of 
Beaumont, Tex. 
Existing project. For description of completed improvement 
and authorizing acts see Annual Report for 
1962. Estimated cost of project is $8,749,000, including 
$2 million contributed by local interests. 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Construction of 
recreation facilities continued. Routine operation and 
maintenance continued. No flood control storage is 
provided in B. A. Steinhagen Lake. Pool elevation at 
start of fiscal year was 83.14 feet above mean sea level, 
corresponding to 96,180 acre-feet of total storage; and 
at end of fiscal year elevation was 79.77 feet above 
mean sea level, corresponding to 57,110 acre-feet of 
total storage. Maximum pool elevation was 83.76 feet 
on 6 July 1969 corresponding to 105,100 acre-feet of 
total storage; minimum pool elevation was 58.88 feet 
on 7 November 1969, corresponding to 539 acre-feet of 
total storage. Water supply benefits accrued to the 
project during fiscal years 1969 and 1970 were water 
releases of 1,412,600 and 774,000 acre-feet, respectively. 
Accumulated releases to June 30, 1970 were 
11,083,400 acre-feet. 
Condition at end of fiscal year. Construction started 
March 1947 and project was ready for beneficial use in 
April 1951. Completion of construction of recreation 
facilities remains. 
3. TRINITY RIVER AND TRIBUTARIES, 
TEX. 
Location. The river basin lies in the eastern half of the 
State of Texas and extends about 360 miles generally 
along a northwest-southeast axis, from Archer County 
on the northwest to Chambers County and the Trinity 
Bay on the Gulf of Mexico on the Southeast. Maximum 
width of the basin, in the headwaters, is about 100 
miles. All or part of 36 counties are included in the 
basin. 
Existing project. Projects authorized by the River and 
Harbor Act of 1965 (H. Doc. 276, 89th Cong., 1st sess.) 
consist of the Trinity River Project (Multiple-Purpose 
Channel, Tennessee Colony Lake, Dallas Floodway 
Extension, West Fork Floodway and Water Conveyance 
Facilities), Aubrey Lake, Lakeview Lake, 
Roanoke Lake, Duck Creek Channel Improvement 
and Elm Fork Floodway. Estimated Federal cost of 
these improvements is $1,371,950,000, U.S. Coast 
Guard aids to navigation is $1,100,000 and non- 
Federal cost for land acquisition and relocations for 
local protection projects is $47,980,000. Estimated total 
cost of improvements is $1,421,030,000. 
AUBREY LAKE: Damsite at river mile 60.0 on 
Elm Fork of Trinity River in northeast Denton 
County, between the towns of Sanger and Aubrey and 
about 30 river miles upstream from Lewisville Dam. 
An earthfill dam 13,660 feet long including a 688 foot 
concrete ogee type spillway, with maximum height of 
118 feet above streambed, which controls 682 square 
miles of drainage area. The lake provides a total 
storage capacity of 899,900 acre-feet, of which 258,300 
are for flood control, 603,800 for water supply storage 
506

FORT WORTH, TEX., DISTRICT 
and 37,800 for sediment reserve. Estimated cost is $50, 
500,000. Local interests are required to reimburse the 
Federal Government for costs allocated to water supply 
storage, estimated at $21,285,000, one-half of the 
separable cost allocated to recreation at $5,303,000 
exclusive of interest and future recreation. 
ROANOKE LAKE: Damsite at river mile 32.0 on 
Denton Creek, a tributary to Elm Fork of Trinity River 
in Denton County and about one-half mile northwest 
of Roanoke, Texas. An earthfill dam 15,200 feet long 
including a 328 foot concrete ogee type spillway, with 
maximum height of 97 feet above streambed, which 
controls 604 square miles of drainage area. The lake 
provides a total storage capacity of 249,900 acre-feet, of 
which 223,700 are for flood control and 26,200 for 
sediment reserve. Estimated cost is $28,600,000. Local 
interests are required to reimburse the Federal Government 
for cost allocated to water supply storage, 
presently estimated at $23,919,000, one-half of the 
separable cost alloted to recreation at $1,461,000 
exclusive of interest and future recreation. 
LIBERTY LOCAL PROTECTION PROJECT: 
(Galveston District): Improvement is located in the 
vicinity of Liberty, Texas and provides for enlargement 
and realignment of the Trinity River in the area. 
Construction of 53,500 feet of levee on the left bank of 
Trinity River in conjunction with the multiple-purpose 
channel, provision of appurtenant interior drainage 
facilities, and relocation or alteration of oil pipelines, 
sewer lines and telephone line. Estimated Federal cost 
is $2,250,000 and non-Federal cost is $450,000. 
Separate information is furnished on the Trinity 
River Project, Lakeview Lake, Elm Fork Floodway 
and Duck Creek Channel Improvement elsewhere in 
this chapter. 
4. TRINITY RIVER PROJECT, TEX. 
Location. The Trinity River basin lies in the eastern 
half of the State of Texas. It extends about 360 miles, 
generally along a northwest-southeast axis, from 
Archer County on the northwest to Chambers County 
and Trinity Bay on the Gulf of Mexico on the 
southeast. Maximum width of the basin, in the 
headwaters, is about 100 miles. Eighteen counties are 
included in the project. The Tennessee Colony dam 
site is located at river mile 339.2 on the Trinity River 
about 16 miles west of Palestine, Texas. The reservoir 
extends into Freestone, Anderson, Henderson and 
Navarro Counties. Dallas Floodway Extension is 
located on the Trinity River in the city of Dallas, 
Dallas County, Texas. West Fork Floodway is located 
on the Trinity River and extends through the urban 
areas of the cities of Fort Worth, Arlington, Grand 
Prairie, Irving and Dallas, and includes Dallas and 
Tarrant Counties, Texas. The Water Conveyance 
Facilities extend northwest from Tennessee Colony to 
Benbrook Reservoir. 
Existing project. The project was authorized by the 
River and Harbor Act of 1965 (H. Doc 276, 89th 
Cong., 1st sess.) Presently the estimated cost of the 
improvements is $1,219,200,000, including $1,100,000 
for the U.S. Coast Guard aids to navigation and $30, 
500,000 non-Federal cost for land acquisition and 
relocation required for the local protection features. 
MULTIPLE-PURPOSE CHANNEL: The navigation 
channel will have a minimum width of 200 feet 
with a minimum depth of 12 feet and will extend from 
the Houston ship channel in Galveston Bay a distance 
of 362.8 miles to the 400 foot square turning basins in 
Fort Worth. Nineteen locks and fifteen navigation 
dams, excluding the Wallisville lock and dam which 
was authorized separately. Sixteen locks from Wallisville 
Lake to and including the first lock above Dallas 
will be 84 feet wide by 600 feet long with the last three 
locks between Dallas and Fort Worth being 84 feet 
wide by 400 feet long. Relocation of all utilities, 
highways, railroads and bridges. Relocation or alterations 
of bridges will provide a minimum of 300 feet 
between the piers and a minimum vertical clearance of 
52 feet above the water surface. Estimated Federal cost 
of the improvements is $865,000,000, including $7,600, 
000 for the Advance Participation on High Level 
Bridges. 
TENNESSEE COLONY LAKE: The plan of 
improvement provides for the construction of an 
earthfilled dam with a maximum height of 113 feet 
above the streambed and a total length of 29,500 feet, 
including a 520 foot controlled concrete ogee type 
spillway, Navigation Lock 10-B located in the right 
abutment of the dam and Lock and Dam 11 in the 
upper portion of the reservoir. The reservoir will have a 
total controlled storage of 3,366,800 acre-feet and a 
water surface area of 119,500 acres at the top of the 
flood control pool and 73,540 acres at the top of the 
conservation pool. The total storage includes 2,144,300 
acre-feet for flood control, 1,032,500 acre-feet for 
conservation and 190,000 acre-feet for sediment 
reserve. Estimated Federal cost of the improvement is 
$209,000,000. 
DALLAS FLOODWAY EXTENSION: The plan 
of improvement provides for enlargement and realignment 
of the Trinity River from the existing Dallas 
Floodway downstream approximately 8.6 miles. The 
enlargement and realignment of three tributary 
channels for a total distance of about 10.5 miles 
through the leveed areas. Construction of a parallel 
levee system through the lower areas consisting of 
about 10.2 miles along the left bank, 14.6 miles along 
the right bank of the main and diversion channels with 
507

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
a minimum distance of 2,000 feet between levees along 
the main channel. Relocation of all utilities, alteration 
of bridges and the acquisition of rights-of-way. The 
estimated Federal cost is $12,900,000 and estimated 
non-Federal cost is $10,700,000 for a total estimated 
cost of $23,600,000 for the improvement. 
WEST FORK FLOODWAY: The plan of improvement 
provides for realignment and enlargement 
along the West Fork of the Trinity River from the 
mouth of the West Fork in the existing Dallas 
Floodway upstream to the existing Fort Worth Floodway, 
a distance of 31 miles. The enlargement and 
realignment of approximately 16.7 miles of tributary 
channels through the leveed areas. The construction of 
a parallel levee system through the low areas consisting 
of about 34 miles of levee along the left bank and 9.1 
miles along the right bank of the main and tributary 
channels with the distance varying from 1,000 feet to 3, 
000 feet between levees along the main channel. 
Relocations of all utilities, alteration of bridges and 
acquisition of rights-of-way. Estimated Federal cost is 
$15,300,000 and the estimated non-Federal cost is $19, 
800,000 for a total estimated cost of $35,100,000 for the 
improvement. 
WATER CONVEYANCE FACILITIES: The 
improvement provides for construction of about 98 
miles of 84 inch pipeline, pumping plant located about 
6 miles upstream from Tennessee Colony dam and 
three booster pumping stations located at various 
points along the pipeline. The pipeline would supply 
about 80 million gallons of water per day from 
Tennessee Colony Lake to the existing Benbrook Lake 
for terminal storage. Estimated Federal cost is $85,400, 
000. 
Local cooperation: Local interests are required to 
reimburse the Federal Government as follows: 1. With 
respect to the Multiple-Purpose Channel, for navigation 
and flood control, the share apportioned to 
navigation of the actual Federal cost for all lands, 
easement and rights-of-way required for construction 
and maintenance of the project and aids to navigation; 
a proportionate share of the cost of bridge alteration 
over existing channels in accordance with the principles 
of Section 6 of the Bridge Alterations Act 
(Truman-Hobbs) of June 21, 1940 as amended; the 
share apportioned to navigation of the actual Federal 
cost for alterations of sewer, water supply, drainage, 
pipelines and other utility facilities; and one-half of the 
separable cost allocated to recreation and fish and 
wildlife enhancement. This reimbursement is presently 
estimated at $56,571,000 for navigation and $2,994,000 
for recreation (excluding future recreation facilities), 
for a total of $59,565,000 exclusive of interest. 2. With 
respect to Tennessee Colony Lake for cost allocated to 
water supply storage and one-half of the separable cost 
allotted to recreation and fish and wildlife enhancement. 
This reimbursement is presently estimated 
at $32,123,000 for water supply and $4,705,000 for 
recreation (excluding future recreation facilities), for a 
total cost of $36,828,000, exclusive of interest. 3. With 
respect to Water Conveyance Facilities, for cost 
allotted to water supply; the reimbursement initially 
will be about 14.92% of total cost, now estimated at 
$12,742,000 exclusive of interest. The facilities will be 
used also for water quality control until additional 
water supply needs develop, at which time the 
remaining 85.08% ($72,658,000) will be reimbursed. 4. 
With respect to the local protection projects, local 
interests will provide without cost to the United States 
all lands, easements and rights-of-way necessary for 
construction, maintenance and operation of the project; 
relocation of all buildings and utilities, bridges 
(except railroad), sewers, pipelines and any existing 
improvement. 5. Local interests will also maintain and 
operate the local protection projects after their completion; 
and share the annual operation and maintenance 
cost allocated for Navigation, Tennessee 
Colony and the Water Conveyance Facilities. 
Operation and results during fiscal year: Regular funds, 
preconstruction planning was initiated in January 
1970 with work on the CPM' Design Criteria, 
Availability of Materials and Tennessee Colony 
Hydrology and Site Section, $166,549. Planning was 
completed on the Advance Participation on High 
Level Bridges and a construction contract was awarded 
for Interstate Highway 45. Construction continued on 
Interstate Highway 635 and State Highway 31. 
Condition at end offiscalyear: Preconstruction planning 
is 2 percent complete, Advance Participation on High 
Level Bridges is 17 percent complete. 
5. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See Table 16-C. 
FLOOD CONTROL 
6. ABILENE CHANNEL IMPROVEMENT, 
TEX. 
Location. On Elm Creek, a tributary of Brazos River, 
and its tributaries, Little Elm, Cat Claw, Cedar, Lytle, 
and Buttonwillow Creeks, in urban area of city of 
Abilene, Taylor County, Tex. 
Existing project. Provides for diversion dike, channel 
clearing and snagging, drainage structures, and channel 
improvements on Elm, Little Elm, Cat Claw, 
Cedar, Ltyle, and Buttonwillow Creeks, together with 
necessary alterations to railroad and highway bridges, 
and urban and private company utilities. Project was 
authorized by Flood Control Act of 1962. Estimated 
Federal cost of improvement is $42,100,000 and 
estimated cost to local interests is $9,700,000 for lands 
and damages and relocations, a total of $51,800,000 
(July 1969). 
508

FORT WORTH, TEX., DISTRICT 
Local cooperation. Local interests must provide lands 
and alter highways and utilities. City of Abilene by 
resolution adopted May 17, 1962, expressed a desire to 
attain a reasonable and satisfactory solution of the 
flood threat confronting the city within the financial 
capabilities of the community. In meeting held in 
District Engineer's office on 21 April 1967, city of 
Abilene officials voiced approval of Corps plan of 
improvement and agreed to furnish assurances regarding 
financing of project. The District Engineer met 
with the City of Abilene on November 13, 1968 and 
May 15, 1969 to secure assurances required for their 
portion of the work. By letter dated 20 Nov 1969 the 
District Engineer requested the city of Abilene to 
provide requirements of local cooperation for its 
portion of the project. The city of Abilene by letter 
dated 3 Dec 1969 certified its capability and willingness 
to provide the requirements of local cooperation 
for its portion of the project. However, in the 
same letter the city stated that it was not possible at this 
time to provide a firm commitment of financial 
capability. 
Operations and results during fiscal year. Preconstruction 
engineering and design was continued. All planning 
was suspended as of 31 Jan 70 due to not receiving 
satisfactory assurances from local interests. 
Condition at end of fiscal year. Preconstruction engineering 
and design is 95 percent complete. 
7. BARDWELL LAKE, TEX. 
Location. Dam is on Waxahachie Creek, 5 river miles 
upstream from its confluence with Chambers Creek, a 
tributary of the Trinity River, and about 5 miles south 
of Ennis, Ellis County, Tex. 
Existing project. For a description of completed 
improvement and authorizing act see Annual Report 
of 1969. Estimated cost of project is $12,630,000. 
Local cooperation Local interests must reimburse the 
Federal Government for costs allocated to increased 
water supply storage under the terms of the Water 
Supply Act of 1958. In Contract approved by the 
Secretary of the Army on June 24, 1963 the Trinity 
River Authority, a State agency, agreed to fulfill all 
requirements of local cooperation. To date the authority 
has paid $22,517 toward principal and $29,017 
toward annual cost of operation and maintenance of 
project, including cost of operating 10-foot conduit. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. (See Table 16-D 
on noteworthy rise on Waxahachie Creek above 
Bardwell Lake.) Pool elevation at start of fiscal year 
was 420.83 feet above mean sea level, corresponding to 
54,270 acre-feet of total storage; and at the end of the 
year, elevation was 420.95 feet above mean sea level, 
corresponding to 54,690 acre-feet of total storage. 
Maximum pool elevation was 427.42 on 4 May 1970, 
corresponding to 80,310 acre-feet of total storage; 
451-584 0-72-33 
minimum pool elevation was 419.13 on 26 October 
1969, corresponding to 48,400 acre-feet of total storage. 
Benefits accrued to Bardwell project: Accumulated 
flood damages prevented through fiscal year 1970 were 
$3,379,000; water supply benefits: During fiscal years 
1969 and 1970 releases of 1110 and 1470 acre-feet, 
respectively, were made. Accumulated releases 
through fiscal year 1970 were 4,410 acre-feet; other 
water uses: No releases were made during fiscal years 
1969 and 1970 for low flow regulation. 
Condition at end of fiscal year. Construction of project 
was started August 1963 and completed for beneficial 
use in November 1965. Recreation facilities is the only 
remaining item of work. 
8. BELTON LAKE, TEX. 
Location. Dam is on Leon River about 16.7 miles 
above confluence of Leon and Lampasas Rivers and 
about 3 miles north of Belton, Tex. (See Geological 
Survey base map, scale 1:500,000 and Geological 
Survey, Belton sheet, scale 1:62,500.) 
Existing project. For a description of completed 
improvement and authorizing acts see Annual Report 
for 1962. Estimated cost of project is $17,239,000. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies. A contract with Brazos River 
Authority, a State agency, for remaining water supply 
storage in reservoir was approved by Secretary of the 
Army on January 15, 1958, at an estimated cost of $1, 
602,822. To date $356,922 has been paid. Under the 
contract Brazos River Authority must also pay 
annually 11.2 percent of actual annual cost of 
operation and maintenance. To date $126,958 has 
been paid. An interim contract with Brazos River 
Authority for emergency use of water supply storage in 
project was approved by Secretary of the Army on 
January 2, 1957. Amount of $152,435 paid by 
authority on March 21, 1957 for use of these facilities 
was credited to interest and principal payable under 
formal water supply contract. 
Operations and results during fiscal year. Preconstruction 
planning continued. Work was initiated on updating 
the Master Plan and plans and specifications for the 
recreation facilities. Design memorandums and plans 
and specifications for Clearing and East Range road 
were completed and approved. A contract was awarded 
for the construction of East Range road. 
Routine operation and maintenance continued. Pool 
elevation at the start of fiscal year was 568.35 feet 
above mean sea level, corresponding to 205,900 acrefeet 
of total storage; and at end of fiscal year elevation 
was 569.13 feet above mean sea level, corresponding to 
211,600 acre-feet of total storage. Maximum pool 
elevation was 582.20 feet on 17 March 1970, corresponding 
to 325,700 acre-feet of total storage; 
minimum pool elevation was 565.10 feet on 4 October 
1969 corresponding to 183,200 acre-feet of total 
storage. Benefits accrued to Belton project: Estimated 
9

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
flood damages prevented this fiscal year were $781,000. 
Accumulated damages prevented through fiscal year 
1970 were $68,347,000 water supply benefits: During 
fiscal years 1969 and 1970 releases of 15,500 and 15,580 
acre-feet, respectively, were made. Accumulated releases 
through fiscal year 1970 were 255,200 acre-feet; 
and other water uses: Releases made during fiscal years 
1969 and 1970 were 1,890 and 3,140 acre-feet 
respectively, for low-flow regulation. Accumulated 
releases through fiscal year 1970 for low-flow regulation 
were 179,900 acre-feet. (See Table 16-D on 
noteworthy rises on Leon River above Belton Lake.) 
Condition at end of fiscal year. Construction started June 
1949 and project was ready for beneficial use in March 
1954. The preconstruction planning for the raising of 
the conservation pool has been completed and construction 
was initiated on East Range road. The only 
remaining work is updating the Master Plan and 
specifications for relocating the recreation facilities. 
The pool raise is 6 percent complete. 
9. BENBROOK LAKE, TEX. 
Location. Dam is in Tarrant County, Tex., on Clear 
Fork of Trinity River 15 river miles upstream from its 
confluence with West Fork of Trinity River about 10 
miles southwest of downtown Fort Worth, Tex. 
Existing project. For description of completed improvement 
and authorizing acts see Annual Report for 
1962. Estimated cost of project is $12,141,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. No water supply storage is included in project. 
Operations and results during fiscal year. Land acquisition 
and construction of recreation facilities continued. 
Routine operation and maintenance continued. (See 
Table 16-D on noteworthy rises on Clear Fork of 
Trinity River above Benbrook Lake.) Pool elevation at 
start of fiscal year was 694.74 feet above mean sea level, 
corresponding to 91,070 acre-feet of total storage; and 
at end of fiscal year elevation was 694.20 feet above 
mean sea level, corresponding to 89,010 acre-feet of 
total storage. Maximum pool elevation was 699.04 feet 
on 1 May 1970 corresponding to 108,700 acre-feet of 
total storage; minimum pool elevation was 692.96 feet 
on 15 March 1970 corresponding to 84,400 acre-feet of 
total storage. Benefits accrued to system consisting of 
Benbrook Lake and Fort Worth Floodway: Accumulated 
flood damages prevented to June 30, 1970 
are estimated at $23,315,000. Other water uses: 
Releases during fiscal years 1969 and 1970 for low flow 
regulation were 2,070 and 2,630 acre-feet, respectively, 
accumulated releases to June 30, 1970 were 86,060 
acre-feet. 
Condition at end of fiscal year. Construction of project 
was started May 1947 and ready for beneficial use in 
September 1952. Minor land acquisition and completion 
of recreation facilities remain. 
10. BIG FOSSIL CREEK, TEX. 
Location. In city of Richland Hills, Tarrant County, 
Tex., on Big Fossil Creek, a tributary of West Fork, 
Trinity River. 
Existing project. For a description on completed 
improvement and authorizing act see annual report of 
1969. Final cost of the improvement was $2,118,000 
($1,917,100 Federal and $200,900 local interest.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Completed 
project is being operated and maintained by the city of 
Richland Hills, Texas. Accumulated flood damages 
prevented through fiscal year 1970 are estimated at $1, 
829,000. 
Condition at end of fiscal year. Construction was started 
in May 1964 and completed in September 1966. 
11. BRAZOS RIVER BASIN, TEX. 
Location. The Brazos River Basin extends from 
eastern New Mexico southeastwardly and diagonally 
across the State of Texas to the Gulf of Mexico. The 
basin has an overall length of about 640 miles and a 
maximum width of about 120 miles. Its total area is 
about 44;640 square miles, of which 1,800 lie within 
four counties in New Mexico and 42,840 within 72 
counties in Texas. 
Existing project. The Flood Control Act of September 
3, 1954 authorized the basinwide plan of improvement 
for the Brazos River Basin as outlined in House 
Document 535, 81st. Congress, 2d session, and appropriation 
of $40 million was authorized for partial 
accomplishment of the plan. The Flood Control Act of 
1962 added the North and South Fork Reservoirs (San 
Gabriel River), and the Flood Control Act of 1968 
added Aquilla Reservoir (Aquilla Creek) and Millican 
and Navasota Reservoirs (Navasota River) to the 
Brazos River Basin plan of improvement. Public Laws 
86-645, 88-253, 89-42, 90-17, 90-483 and 91-282 
increased monetary authorization $21, $30, $14, $9, $2 
and $5 million respectively, bringing total authorization 
to $121 million. The plan provides for 
construction of the following reservoirs for flood control 
and allied purposes in the Brazos River Basin, Texas: 
Waco Reservoir on Bosque River, Proctor Reservoir on 
Leon River, Stillhouse Hollow Reservoir on Lampasas 
River, Laneport, North Fork and South Fork Reservoirs 
on San Gabriel River, Somerville Reservoir on 
Yegua Creek, Millican and Navasota Reservoirs on 
Navasota River, and Aquilla Reservoir on Aquilla 
Creek. The plan further provides for modification of 
existing Belton Reservoir project by installation of 
hydroelectric power generating facilities. The plan also 
provided for construction of a levee and related work 
on west side of the Brazos River to afford protection for 
Burleson County Levee Improvement District No. 1 
and local flood works at Lampasas, Texas, but due to 
lack of receipt of required assurances of local co- 
510

FORT WORTH, TEX., DISTRICT 
operation within five-year limitation period the authorization 
for these improvements expired. Project 
maps are in the Senate Project Documents. The 
estimated cost of the basinwide plan of improvement is 
$412,317,000. Proctor, Somerville, Stillhouse Hollow, 
Waco and San Gabriel River Reservoir projects are 
reported separately. Detailed planning has not been 
initiated on other projects in the plan of improvement. 
(See Table 16-E for Flood Control Works included in 
Basinwide Plan, and 16-F for Results of Reservoir 
Regulation on River Stages at Controlling Gaging 
Stations Downstream.) 
12. CANYON LAKE, TEX. 
Location. Dam is on Guadalupe River, 303 miles 
above its mouth, and about 12 miles northwest of New 
Braunfels, Comal County, Tex. 
Existing project. For a description of completed 
improvement and authorizing act see Annual Report 
of 1969. Estimated cost of project is $20,927,000 
(including $1,400,000 contributed by local interests.) 
Local cooperation. Local interests (Guadalupe-Blanco 
River Authority) must contribute $1,400,000 during 
construction, and pay remainder of costs allocable to 
local interests, with interest thereon at rate of 2.5 
percent per annum, over a period not to exceed 50 
years, for which they will be permitted to utilize water 
impounded for water supply and streamflow regulation 
for development of electric power. In a formal contract 
approved by Chief of Engirieers on October 24, 1957, 
Guadalupe-Blanco River Authority agreed to fulfill all 
requirements of local cooperation. Required $1,400, 
000 contribution was made in full by Guadalupe- 
Blanco River Authority. In addition, $22,848 was 
contributed for installation and operation of reservoir 
leakage gages. Under the contract the authority must 
pay 34.8 percent of actual annual cost of operation and 
maintenance. To date $196,824 has been paid. 
Operations and results during fiscal year. Regular funds: 
Routine operation and maintenance continued. There 
were no noteworthy rises on the Guadalupe River 
above Canyon Reservoir during the fiscal year. 
Pool elevation at start of fiscal year was 906.76 feet 
above mean sea level, corresponding to 368,000 acrefeet 
of total storage; and at end of fiscal year elevation 
was 908.46 feet above mean sea level, corresponding to 
381,800 acre-feet of total storage. Maximum pool 
elevation during fiscal year was 910.89 feet on 2 June 
1970, corresponding to 402,000 acre-feet of total 
storage; minimum pool elevation was 904.90 on 25 
August 1969, corresponding to 353,400 acre-feet of 
total storage. Benefits accrued to Canyon project: 
Accumulated damages prevented through fiscal year 
1970 were $1,782,200; water supply benefits: During 
fiscal years 1969 and 1970 releases of 137,100 and 330, 
600 acre-feet, respectively, were made. Accumulated 
releases through fiscal year 1970 were 1,052,600 acrefeet. 
Condition at end of fiscal year. Construction started April 
1958 and project completed for beneficial use June 
1964. The only remaining items to be completed are 
the recreational facilities. 
13. DUCK CREEK CHANNEL 
IMPROVEMENT, TEX. 
Location. In Garland, Dallas County, Texas on Duck 
Creek, a tributary of the Trinity River between river 
mile 10.4 and 17.5. 
Existing project. Provides for realignment and enlargement 
of 6.6 miles of channel improvement 
consisting of concrete walls, modification of drainage 
facilities, 2 railroad bridges, 8 street bridges and 
relocation of all utilities. Estimated federal cost of these 
modifications is $5,800,000 and estimated cost to local 
interests is $1,830,000, a total of $7,630,000. Existing 
project was authorized by River and Harbor Act of 
1965 in House Document 276, 89th Congress, 1st 
Session. 
Local cooperation. Local interests must provide without 
cost to the United States all lands, easements and 
rights-of-way necessary for construction, and all 
alterations and relocations of existing buildings, 
utilities, bridges (except railroad bridges), sewers, 
pipelines and any other existing improvements; hold 
the United States free from damages due to the 
construction work, operate and maintain all features 
after completion of the project. 
Operations and results during fiscal year. Regular funds, 
new work: Preconstruction planning was continued 
and the General Design Memorandum was completed 
and submitted for approval. 
Condition at end offiscalyear. Preconstruction planning 
is 55 percent complete. 
14. ELM FORK FLOODWAY, TEX. 
Location: The project is located in Dallas and Denton 
Counties, Texas. A portion of the improvement will be 
in and adjacent to the cities of Dallas, Irving and 
Farmers Branch, Texas. 
Existing project. Improvement of the Elm Fork of the 
Trinity River from the mouth to Lewisville Dam and 
along Denton Creek, a tributary of the Elm Fork to 
Grapevine Dam. The plan of improvement provides 
for enlargement and realignment of about 22 miles of 
the Elm Fork, enlargement and realignment of about 
20 miles of tributary channels, construction of about 39 
miles of new levee, rehabilitation of about 2 miles of 
existing levees, modification of 14 street and highway 
bridges, 4 railroad bridges and alteration of utilities. 
Estimated Federal cost of these modifications is $17, 
500,000, and non-Federal estimated cost is $15,200, 
000. Project was authorized by the River and Harbor 
Act of 1965 (H. Doc. 276, 89th Cong. 1st sess.) 
Local cooperation: Local interests are required to 
provide (without cost to the Federal Government) 
511

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
except for the main channel thereof, all lands, 
easements, utilities and bridge relocations (except 
railroad bridges) necessary for construction and operation 
of the project. Assurances were signed 20 
March 1969 by the Trinity River Authority, a State 
agency, that they would provide items required of local 
interests. 
Operations and results during fiscal year: Regular funds, 
new work, preconstruction planning was initiated, cost 
$48,243. Initiated work on the network analysis 
diagram, General Design Memorandum and Relocations 
- Part I Design Memorandum. 
Condition at end of fiscal year. Preconstruction planning 
is 7 percent complete. 
15. FORT WORTH FLOODWAY (CLEAR 
FORK) TEX. 
Location. In Fort Worth, Tarrant County, Tex., on 
Clear Fork of Trinity River between miles 1.6 and 10.4. 
Existing project. Provides for improvement of 6.5 miles 
of river channel, construction of 2.3 miles of levee, 
appurtenant interior drainage facilities, and 1.0 mile of 
diversion channels. Estimated Federal cost of these 
modifications is $4,225,000 and estimated cost to local 
interests is $4,590,000 a total of $8,815,000. Existing 
project was authorized by Flood Control Act of 1962, 
substantially in accordance with recommendations of 
Chief of Engineers in House Document 454, 87th 
Congress, 2d session. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Regular funds: 
Continued increment 3 channel improvement $646, 
925 and continued engineering and design $10,116. 
Condition at end offiscalyear. Construction was initiated 
in January 1966 and is 97 percent complete. Relocations, 
channel improvement, and engineering and 
design are 100, 95 and 99 percent complete, respectively. 
16. FORT WORTH FLOODWAY (WEST 
FORK) TEX. 
Location. In Fort Worth, Tarrant County, Tex., on 
West Fork of Trinity River between miles 564.5 and 
570.4. 
Existing project. Provides for improvement of 4.1 miles 
of river channel, construction of 6.2 miles of levee, 
appurtenant drainage facilities, and 1.6 miles of 
diversion channels. Estimated Federal cost of these 
modifications is $3,345,000 and estimated cost to local 
interests is $4,247,000 a total of $7,592,000. Fort Worth 
Floodway extension was authorized by Flood Control 
Act of 1960 substantially in accordance with recommendations 
of Chief of Engineers in House Document 
402, 86th Congress, 2d session. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Regular funds: 
Continued increment 3 channel improvement, levees, 
and slope protection $200,423, and engineering and 
design by hired labor $12,185. 
Condition at end of fiscal year. Construction was initiated 
in March 1965 and the project is 99 percent complete. 
Channel improvement and levee construction are 99 
percent complete. 
17. GRAPEVINE LAKE, TEX. 
Location. Dam is in Tarrant County, Tex., on Denton 
Creek 11.7 river miles upstream from its confluence 
with Elm Fork of Trinity River and about 20 miles 
northwest of city of Dallas, Tex. 
Existing project. For description of completed improvement 
and authorizing act see Annual Report for 
1962. Estimated cost of project is $12,063,000, including 
$2,040,000 contributed by local interests. 
Local cooperation. Local interests must pay for water 
supply storage included in project. A contract with 
Dallas County Park Cities Water Control and Improvement 
District No. 2 for 50,000 acre-feet of water 
supply storage was approved by Secretary of the Army 
on March 21, 1955. Park Cities paid the required $607, 
000. A contract with city of Dallas for 85,000 acre-feet 
of water supply storage was approved by the Secretary 
of the Army on March 17, 1954. Dallas paid required 
$1,433,026. A contract with city of Grapevine, Tex., for 
1,250 acre-feet of water supply storage was approved 
by Secretary of the Army on September 14, 1953, at an 
estimated cost of $22,654. To date Grapevine has paid 
$18,473. Above contracts include payment of operation 
and maintenance costs as follows: Dallas County Park 
Cities Water Control and Improvement District No. 2, 
a pro rata part of actual annual cost, which part to be 
not less than $2,000 nor more than $3,000; Dallas, 9.2 
percent of actual annual cost; and Grapevine, its pro 
rata part of actual annual cost (estimated at $79.55 
annually and included in total annual payment). 
Following operation and maintenance payments have 
been made: Park Cities $50,775, Dallas $98,972 and 
Grapevine $1,353. 
Operations and results during fiscal year. Construction of 
recreation facilities and routine operation and maintenance 
continued. Pool elevation at start of fiscal year 
was 534.94 feet above mean sea level, corresponding to 
188,100 acre-feet of total storage; and at end of fiscal 
year elevation was 534.62 feet above mean sea level, 
corresponding to 185,800 acre-feet of total storage. 
Maximum pool elevation during fiscal year was 541.27 
feet on 10 March 1970, corresponding to 238,500 acrefeet 
of total storage; minimum pool elevation was 
531.13 feet on 5 December 1969 corresponding to 161, 
400 acre-feet of total storage. Benefits accrued to 
system comprised of Garza-Little Elm Lake, Grapevine 
Lake, and the Dallas Floodway: Flood damages 
prevented this fiscal year were $7,457,000 and accumulated 
damages prevented through fiscal year 1970 
were $201,692,000. Water supply benefits: During 
fiscal years 1969 and 1970 releases of 78,130 and 39,940 
512

FORT WORTH, TEX., DISTRICT 
acre-feet, respectively, were made and accumulated 
releases through fiscal year 1970 were 549,600 acrefeet. 
(See Table 16-D on significant rises on Denton 
Creek above Grapevine Lake.) 
Condition at end of fiscal year. Construction of project 
was started December 1947 and ready for beneficial 
use in July 1952. Completion of recreation facilities 
remains. 
18. GUADALUPE AND SAN ANTONIO 
RIVERS, TEX. 
Location. Improvements are Gonzales Lake on lower 
San Marcos River, a tributary of Guadalupe River and 
channel improvement of San Antonio River and 
tributaries at San Antonio, Tex. 
Existing project. Flood Control Act of 1954 (H. Doc. 
344, 83d Cong., 2d sess.) adopted plan of improvement 
on Guadalupe and San Antonio Rivers. Plan provides 
for construction of Gonzales Lake on San Marcos River 
for flood control and water supply and local flood 
protection for cities of San Antonio and Kenedy, Tex. 
Due to lack of local cooperation, authorization for 
Kenedy Channel improvement expired May 5, 1964. 
Existing project maps are in project document. As 
itemized in tables below, estimated cost for new work is 
$85,600,000 including $24,300,000 non-Federal cost on 
local flood protection projects. (See Table 16-G on 
flood control works.) 
19. HORDS CREEK LAKE, TEX. 
Location. On Hords Creek, a tributary of Pecan 
Bayou, about 13.5 miles west of Coleman, Tex., and 
about 27.8 miles upstream from mouth of Hords Creek. 
(See Geological Survey sheets, Grosvenor and Zephyr, 
scale 1:62,500.) 
Existing project. For description of completed improvement 
and authorizing acts see Annual Report for 
1962. Estimated cost of project is $2,857,000 including 
$105,000 contributed by local interests. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. There were no 
noteworthy rises on Hords Creek above Hords Creek 
Lake during the fiscal year. Pool elevation at start of 
year was 1,899.68 feet above mean sea level, corresponding 
to 8,480 acre-feet of total storage; and at 
end of fiscal year was 1899.87 feet above mean sea 
level, corresponding to 8,570 acre-feet of total storage. 
Maximum pool elevation was 1904.45 feet on 28 May 
1970 corresponding to 11,180 acre-feet of total storage; 
minimum pool elevation was 1897.62 feet on 8 
September 1969, corresponding to 7,490 acre-feet of 
total storage. Benefits accrued to Hords Creek project: 
Accumulated flood damages prevented through fiscal 
year 1970 were $926,600; water supply benefits: 
During fiscal years 1969 and 1970 releases of 920 and 
800 acre-feet, respectively, were made; accumulated 
releases through fiscal year 1970 were 16,560 acre-feet; 
and other water uses: Releases for low flow regulation 
during fiscal years 1969 and 1970 were 18 and 207 
acre-feet and accumulated releases through fiscal year 
1970 were 820 acre-feet. 
Condition at end of fiscal year. Construction of project 
was started January 1947 and completed for beneficial 
use in April 1948. Completion of recreational facilities 
remains. 
20. LAKEVIEW LAKE, TEX. 
Location. Damsite is located at river mile 11.2 on 
Mountain Creek, a right bank tributary of the West 
Fork of the Trinity River, and is adjacent to the city 
limits of Grand Prairie, Dallas County, Texas, which is 
one of the rapidly growing cities in the Dallas-Fort 
Worth metropolitan area. 
Existing project. The project provides for construction 
of an earthfill dam with a maximum height of 113 feet 
above the streambed and a total length of 25,890 feet, 
including a 200-foot uncontrolled ogee type spillway, 
which will control 232 square miles of drainage area. 
The reservoir will have a total controlled storage of 
375,300 acre-feet and a water surface area of 12,710 
acres at the top of the flood control pool and 9,510 acres 
at the top of the conservation pool. The total storage 
includes 119,800 acre-feet for flood control, 217,500 
acre-feet for conservation and 38,000 acre-feet for 
sediment reserve. Estimated Federal cost of the project 
is $79,700,000. Project was authorized by River and 
Harbor Act of 1965 (H. Doc. 276, 89th Cong., 1st. sess.), 
and is a unit in the general comprehensive plan for 
development and control of the water resources of the 
Trinity River basin. 
Local cooperation. Prior to initiation of construction, 
responsible local interests must give assurances satisfactory 
to the Secretary of the Army that they will: (a) 
reimburse the United States for the water supply 
storage in the project on terms which will permit 
paying out the costs allocated thereto as determined by 
the Chief of Engineers in accordance with the 
provisions of the Water Supply Act of 1958, as 
amended, and (b) obtain without cost to the United 
States all water rights necessary for operation of the 
project in the interest of water supply. The Trinity 
River Authority, a State agency, is the principal 
proponent of the project, and by letters dated 2 
October 1961 and 9 August 1962 and in informal 
discussions has stated that it is the intent of this 
organization to sponsor and to comply on items of 
cooperation required of local interests. 
Operations and results during fiscal year. Regular funds, 
new work: Preconstruction planning was continued at 
cost of $316,358. The General Design Memorandum 
was completed and submitted for approval and was 
returned without action pending action of the Bureau 
of the Budget. Completed and submitted land for 
construction and reservoir area Design Memorandum. 
513

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Land Requirements Plan-Public Use was completed 
and approved. 
Condition at end of fiscalyear. Preconstruction planning 
is 88 percent complete. 
21. LEWISVILLE DAM, TEX. 
Location. In Denton County, Tex. on Elm Fork of 
Trinity River 30 river miles above its confluence with 
Trinity River and about 22 miles northwest of city of 
Dallas, Tex. at a site downstream from old Garza Dam. 
Existing project. For description of completed improvement 
and authorizing acts see Annual Report for 
1962. Estimated cost of project is $23,492,000 including 
$3,677,000 contributed by local interests. 
Local cooperation. Local interests must contribute 
incremental cost of water supply storage and convey to 
Federal Government sufficient interest in lands and 
appurtenances of old Garza Dam and Reservoir to 
insure proper operation and management of existing 
project. A contract with city of Dallas for 415,000 acrefeet 
of water supply storage and rights and interests to 
Garza Dam and Reservoir was approved by the 
Secretary of the Army on July 16, 1953. Local 
contributions have been made in full. A contract with 
city of Denton, Tex., for remaining 21,000 acre-feet of 
water supply storage was approved by the Secretary of 
the Army on May 20, 1954, with an estimated cost of 
$250,064. To date Denton has paid $191,191. Under 
above contracts, cities of Dallas and Denton must pay 
annually 21.9 and 1 percent, respectively, of actual 
annual cost of operation and maintenance. To date 
Dallas has paid $442,398 and Denton $18,811. 
Operations and results during fiscal year. Regular funds: 
Construction of recreation facilities and routine operation 
and maintenance continued. Pool elevation at 
start of fiscal year was 515.83 feet above mean sea level, 
corresponding to 484,200 acre-feet of total storage; and 
at end of fiscal year elevation was 514.54 feet above 
mean sea level, corresponding to 454,000 acre-feet of 
total storage. Maximum pool elevation was 522.70 feet 
on 2 May 1970 corresponding to 669,500 acre-feet of 
total storage; minimum pool elevation was 509.61 feet 
27 December 1969 corresponding to 351,500 acre-feet 
of total storage. Benefits accrued to system comprised of 
Garza-Little Elm Lake, Grapevine Lake, and Dallas 
Floodway: Flood damages prevented this fiscal year 
were $7,457,000 and accumulated damages prevented 
through fiscal year 1970 were $201,692,000; water 
supply benefits: During fiscal years 1969 and 1970 
releases of 270,500 and 194,500 acre-feet, respectively, 
were made, accumulated releases through fiscal year 
1970 were 1,946,000 acre-feet. (See Table 16-D on Elm 
Fork of Trinity River above Garza-Little Elm Lake.) 
Condition at end of fiscal year. Construction of project 
was started November 1948 and ready for beneficial 
use in November 1954. Completion of recreation 
facilities remains. 
22. LAVON LAKE, TEX. 
Location. Dam is in Collin County, Tex., on East Fork 
of Trinity River 55.9 miles above its confluence with 
Trinity River and about 22 miles northeast of Dallas, 
Tex. 
Existing project. For description of completed improvement 
and authorizing acts see Annual Report for 
1962; for information concerning Lavon Lake modification 
and East Fork Channel improvement project, 
see individual project. Estimated cost of project is $12, 
615,300. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. Local interests must repay cost of a water 
supply intake structure. A contract with North Texas 
Municipal Water District for water supply storage, 
including cost of intake structure, was approved by 
Secretary of the Army July 8, 1954, at an estimated cost 
of $1,405,753. To date the district has paid $279,864. 
Under the contract North Texas Municipal Water 
District must pay annually 13.6 percent of actual 
annual cost of operation and maintenance. To date the 
district has paid $173,817. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. Pool elevation at 
start of fiscal year was 473.09 feet above mean sea level, 
corresponding to 156,000 acre-feet of total storage; and 
at end of fiscal year elevation was 472.43 feet above 
mean sea level, corresponding to 148,400 acre-feet of 
total storage. Maximum pool elevation was 480.72 feet 
on 22 March 1970 corresponding to 259,000 acre-feet 
of total storage; minimum pool elevation was 468.88 
feet on 5 December 1969, corresponding to 111,400 
acre-feet of total storage. Benefits accrued to Lavon 
project: Flood damages prevented this fiscal year were 
$1,430,000, and accumulated damages prevented 
through fiscal year 1970 were $28,515,000 water supply 
benefits: During fiscal years 1969 and 1970 releases of 
33,820 and 39,690 acre-feet, respectively, were made. 
Accumulated releases through fiscal year 1970 were 
336,400 acre-feet; and other water uses: During fiscal 
years 1969 and 1970 releases of 0 and 40 acre-feet, 
respectively were made for low-flow regulation, accumulated 
releases for this purpose through fiscal year 
1970 were 43,400 acre-feet. (See Table 16-D on 
noteworthy rises on East Fork of Trinity River above 
Lavon Lake.) 
Condition at end of fiscal year. Construction of project 
was started January 1948 and ready for beneficial use 
in September 1953. Project is complete. See separate 
sheet for Lavon Lake Modification and East Fork 
Channel Improvement authorized by Flood Control 
Act of 1962. 
514

FORT WORTH, TEX., DISTRICT 
23. LAVON LAKE MODIFICATION AND 
EAST FORK CHANNEL 
IMPROVEMENT, TEX. 
Location. Existing dam is in Collin County, Tex., on 
East Fork of Trinity River, 55.9 miles above its 
confluence with Trinity River and about 22 miles 
northeast of Dallas, Tex. Channel improvement of East 
Fork extends from its mouth to river mile 31.8. 
Existing project. Reservoir modification provides for 
raising top of existing dam from elevation 502.0 to 
514.0 and lengthening existing dam from about 9,499 
feet to about 19,493 feet; modification of existing 
concrete spillway structure; enlargement of existing 
reservoir area, involving acquisition of additional 
rights-of-way; relocation and alteration of highways, 
county roads, railroads and utilities; and provision of 
recreational facilities. East Fork Channel and floodway 
improvements consist of 25 miles of channel enlargement 
and straightening of the East Fork between 
river mile 0.0 and 31.8; replacement of inadequate 
levee-sluice structures; rehabilitation of existing levees; 
acquisition and clearing of land areas as required for 
rights-of-way along improved channel and existing 
levees; alteration of existing railroad, highway and 
county road bridges crossing the improved channel as 
well as relocation of existing utility lines; and strengthening 
and raising about 202,400 linear feet of levees of 
seven existing levee districts. Reservoir will provide a 
total storage capacity of 748,200 acre-feet (275,600 are 
for flood control, 380,000 for water supply storage, and 
92,600 for sedimentation reserve). Estimated Federal 
cost of the modification and improvement is $53,900, 
000 and estimated cost to local interests is $490,000 for 
lands and damages and relocations, a total of $54,390, 
000. 
Local cooperation. Local interests must reimburse the 
Federal Government for costs allocated to increased 
water supply storage under the terms of the Water 
Supply Act of 1958. The North Texas Municipal 
Water District has contracted for 43 percent of the 
water supply (approved September 22, 1967 by the 
Secretary of the Army) and has submitted assurances to 
contract for the 57 percent for future water supply. 
Reimbursement is currently estimated at $38,532,000. 
$32,447.000. Local interests costs in connection with 
the channel improvement are estimated at $490,000 for 
lands and damages and relocation of highway bridges 
and utilities. Supervision of Kaufman County Levee 
Districts Nos. 4, 5, 6, 8, 10, 13, and 15 submitted jointly 
a letter dated June 30, 1961, indicating their approval 
of the proposed channel and levee improvement 
Supervisors of Kaufman County Levee Districts 4 
and 5 have furnished assurances through resolutions 
adopted by them on January 17, 1967 and February 3, 
1967, respectively, that they will fulfill the requirements 
of local cooperation within their districts, 
comprising the lower 10 miles of the channel. Construction 
will be initiated in this lower channel reach in 
advance of receipt of assurances of local cooperation on 
the upper reach if assurances are not received for the 
whole improvement before construction is to be started. 
Operations and results during fiscal year. Regular funds: 
Initiated construction on the Embankment and Spillway 
Modification $150,000 and continued Boundary 
Monumentation $31,189 and Engineering and Design 
$447,673. 
Condition at end of fiscal year. Embankment and 
Spillway Modifications, Boundary Monumentation 
and Engineering and Design are 1, 62 and 63 percent 
complete respectively. The project as a whole is 13 
percent complete. 
24. NAVARRO MILLS LAKE, TEX. 
Location. Dam is in Navarro County, Tex., at river 
mile 63.9 on Richland Creek, a tributary of Trinity 
River, about 16 miles southwest of Corsicana, Tex. 
Existing project. For description of completed improvement 
and authorization acts see Annual Report 
for 1965. Estimated cost of project is $10,106,000 
including $300,000 contributed by local interests. 
Local cooperation. Construction of project is subject to 
condition that local interests pay an amount equal to 
25 percent of total cost of project for water-supply 
storage space provided in reservoir; pay $300,000 as 
total cost of project attributable to increase in net 
returns for higher utilization of downstream valley 
lands; and assume 25 percent of annual cost of 
maintenance and operation, payable in one lump sum 
on a capitalized basis, or annually. In a formal contract 
approved by Secretary of the Army on August 27, 1959, 
Trinity River Authority agreed to fulfill all requirements 
of local cooperation. In supplemental 
agreement entered into August 18, 1965, contract with 
Trinity River Authority was modified to provide for a 
division of the storage space into storage for a present 
and future water supply, and revision of payment 
schedules, to become due and payable January 1, 1966, 
and annually thereafter. To date $60,155 has been 
paid on principal and $89,889 toward operation and 
maintenance under terms of the contract. Non-Federal 
contributions totaling $300,000 have been received. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. Pool elevation at 
start of fiscal year was 424.22 feet above mean sea level, 
corresponding to 61,920 acre-feet of total storage, and 
at end of fiscal year elevation was 424.10 feet above 
mean sea level, corresponding to 61,320 acre-feet of 
total storage. Maximum pool elevation was 432.28 on 
11 March 1970, corresponding to 112,100 acre-feet of 
total storage; minimum pool elevation was 422.22 feet 
on 27 October 1969 corresponding to 52,270 acre-feet 
of total storage. Benefits accrued to Navarro Mills 
project: Flood damages prevented this fiscal year were 
$471,000 and accumulated damages prevented 
through fiscal year 1970 were $15,555,000 and other 
water uses: During fiscal years 1969 and 1970 releases 
515

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
1,990 and 220 acre-feet respectively were made for low 
flow regulation, accumulated releases for this purpose 
through fiscal year 1970 were 21,610 acre-feet. (See 
Table 16-D on significant rises on Richland Creek 
above Navarro Mills Lake.) 
Condition at end of fiscal year. Construction started 
December 1959 and project completed for beneficial 
use March 1963. Completion of recreation facilities 
remains. 
25. PROCTOR LAKE, TEX. 
Location. Dam is at river mile 238.9 on Leon River, a 
tributary of Brazos River, about 8 miles northeast of 
Comanche in Comanche County, Tex. 
Existing project. For description of completed improvement 
and authorization act see Annual Report of 
1969. Estimated cost of project is $15,124,000. 
Local cooperation. Construction of project is subject to 
condition that local interests contribute toward cost of 
project for water-supply storage. Brazos River Authority, 
a State agency, assumed responsibility of 
disposing of water-supply storage space provided in 
project. A formal contract was approved by Secretary 
of the Army July 1, 1960, at an estimated cost of $1,707, 
900. Contract was modified by supplemental agreement 
November 1, 1965, to provide for division of 
storage for present and future water supply. $25,880 
has been paid to date on principal for present water 
supply. Under the supplement agreement the Authority 
must pay annually 5.166 percent of annual cost 
of operation and maintenance of the project. To date 
the Authority has paid $26,319. 
Operations and results during fiscal year. Regular funds: 
Routine operation and maintenance were continued. 
Pool elevation at start of fiscal year was 1161.95 feet 
above mean sea level, corresponding to 59,160 acre-feet 
of total storage; and at end of fiscal year elevation was 
1162.02 feet above mean sea level, corresponding to 59, 
490 acre-feet of total storage. Maximum pool elevation 
was 1166.72 on 24 March 1970 corresponding to 83,700 
acre-feet of total storage; minimum pool elevation was 
1160.49 feet on 4 October 1969, corresponding to 52, 
690 acre-feet of total storage. Benefits accrued to 
Proctor project: Accumulated flood damages prevented 
through fiscal year 1970 were $4,092,000; water 
supply benefits: During fiscal years 1969 and 1970 
releases of 4,440 and 7,400 acre-feet, respectively, were 
made. Accumulated releases through fiscal year 1970 
were 15,560 acre-feet. (See Table 16-D for noteworthy 
rises on Leon River above Proctor Lake. Other water 
uses: Releases for low-flow regulation during fiscal 
years 1969 and 1970 were 0 and 1,260 acre-feet, 
respectively, and accumulated releases through fiscal 
year 1970 for this purpose were 11,320 acre-feet. 
Condition at end of fiscal year. Construction of project 
was started July 1960 and completed for beneficial use 
1963. Work remaining is completion of real estate 
activities, pending settlement of land deficiency claims 
and completion of recreation facilities. 
26. RUTLEDGE HOLLOW CREEK 
CHANNEL IMPROVEMENT, POTEET, 
TEXAS 
Location. In Poteet, Atascosa County, Texas, on 
Rutledge Hollow Creek, a tributary of the Atascosa 
River in the Nueces River Basin. 
Existing project. For description of completed improvements 
and authorization act see Annual Report 
of 1969. The Federal cost was $105,300 and local 
interests cost was $75,000. A total cost of $180,300. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Regular funds: 
Completed drainage facilities $5,840. The City of 
Poteet, Texas, assumed the responsibilities of operation 
and maintenance of the completed channel improvement 
on 31 October 1968. 
Condition at end of fiscal year. Construction was started 
in June 1968 and was completed in October 1968. 
27. SAN ANGELO LAKE, TEX. 
Location. Dam is on North Concho River, a tributary 
of Concho River, about 6.6 miles above mouth of North 
Concho River near city of San Angelo, Tex. (See 
Geological Survey base map, Texas, scale 1:500,000, 
and sheet Wall, scale 1:62,500.) 
Existing project. For description of completed improvement 
and authorizing acts see Annual Report for 
1962. Estimated cost of project is $16,200,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. A water-supply contract with Upper Colorado 
River Authority for water-supply storage in reservoir 
was approved by Secretary of the Army on October 11, 
1948. The Authority has contributed $860,441 toward 
cost of project and $64,324 toward operation and 
maintenance for a 50-year period. The Authority must 
pay additional consideration of $1 a year for useful life 
of project, beginning January 1, 1965. 
Operations and results during fiscal year. Regular funds: 
Construction of recreation facilities and routine operation 
and maintenance continued. Pool elevation at 
start of fiscal year was 1863.47 feet above mean sea 
level, corresponding to 6,330 acre-feet of total storage; 
and, at end of fiscal year, elevation was 1852.76 feet 
above mean sea level, corresponding to 1,180 acre-feet 
of total storage. Maximum pool elevation was 1863.47 
on 1 July 1969 corresponding to 6,330 acre-feet of total 
storage; minimum pool elevation was 1852.76 feet on 
30 June 1970, corresponding to 1,180 acre-feet of total 
storage. Benefits accrued to San Angelo project: 
Accumulated flood damages prevented through fiscal 
year 1970 were $2,343,000; water supply benefits: 
During fiscal years 1969 and 1970 releases of 4,290 and 
6,040 acre-feet, respectively, were made, and accumulated 
releases through fiscal year 1970 were 83, 
516

FORT WORTH, TEX., DISTRICT 
720 acre-feet; and other water uses: Releases for lowflow 
regulation during fiscal years 1969 and 1970 were 
54 and 28 acre-feet, respectively, and accumulated 
releases through fiscal year 1970 were 25,150 acre-feet. 
Condition at end of fiscal year. Construction of project 
was started May 1947 and ready for beneficial use 
February 1952. Work remaining consists of completion 
of recreational facilities. 
28. SAN ANTONIO CHANNEL 
IMPROVEMENT, TEX. 
Location. Floodway is in city of San Antonio, Bexar 
County, Tex., on San Antonio River and San Pedro, 
Apache, Alazan, and Martinez Creeks. 
Existing project. Provides for clearing, widening, 
deepening, and straightening about 31 miles of river 
and creek channels to carry standard project flood 
discharges, construction of channel walls, and paving, 
conduit, and construction and alteration of railroad 
bridges. Estimated Federal cost of these modifications 
is $27,900,000 and estimated cost to local interests is 
$24,300,000 which includes $800,000 cash contributions 
and $23,500,000 for lands, damages, and 
construction, a total of $52,200,000. Existing project 
was authorized by 1954 Flood Control Act (H. Doc. 
344, 83d Cong., 2d sess.). Latest published map is in 
project document. 
Local cooperation. Local interests must furnish lands 
and rights-of-way for construction, including purchase 
and removal of buildings, relocation or reconstruction 
of bridges (exclusive of railway bridges), channel dams 
where applicable, and utility lines; hold the United 
States free from damages; maintain and operate all 
works after completion; and provide a cash contribution 
for enhancement benefits of 2.65 percent of 
actual Federal construction cost. San Antonio River 
Authority furnished assurances that it will comply with 
all requirements of local cooperation. These assurances 
were accepted by the District Engineer on April 15, 
1957. To date $327,000 has been contributed by San 
Antonio River Authority. In addition, $30,000 has 
been contributed and accepted, under the authority of 
Civil Functions Appropriations Act of 1958, for 
vehicular crossings over the San Antonio channel. 
Operations and results during fiscal year. Regular funds: 
Initiated construction on units 3 and 4-3, $894,752. 
Continued Engineering and Design $136,822. Accumulated 
flood damages prevented through fiscal 
year 1970 were $4,550,000. 
Condition at end of fiscal year. Construction was started 
in October 1957 and project is 44 percent complete. 
Relocations, channel improvement, and engineering 
and design are 79, 41, and 75 percent complete, 
respectively. 
29. SAN GABRIEL RIVER, TRIBUTARY 
TO BRAZOS RIVER, TEXAS 
Location. System of three reservoirs in Williamson 
County in the central portion of Brazos River Basin. 
Laneport dam at river mile 31.9 on San Gabriel River, 
about 7 miles east of Granger, Tex.; North Fork dam at 
river mile 4.3 on North Fork of San Gabriel River, 
about 3.5 miles northwest of Georgetown, Tex.; and 
South Fork dam at river mile 4.7 on South Fork of San 
Gabriel River, about 3 miles southwest of Georgetown, 
Tex. 
Existing project. Laneport Lake was authorized by 
1954 Flood Control Act, and North and South Fork 
Lakes were authorized by 1962 Flood Control Act. 
Estimated total Federal cost of project is $78,400,000. 
Plan of improvement provides for the following: 
Laneport: An earthfilled dam 16,320 feet long, with 
maximum height of 115 feet above streambed, which 
controls 709 square miles of drainage area. Reservoir 
provides a total storage capacity of 244,200 acre-feet, of 
which 162,200 acre-feet are for flood control, 37,900 
acre-feet for water supply storage, and 44,100 acre-feet 
for sediment reserve. Estimated cost of project is $42, 
800,000. North Fork: A rockfill dam 5,950 feet long 
with maximum height of 165 feet above streambed, 
which controls 246 square miles of drainage area. 
Reservoir provides a total storage capacity of 130,800 
acre-feet, of which 87,600 acre-feet are for flood 
control, 29,200 acre-feet for water supply storage, and 
14,000 acre-feet for sediment reserve. Estimated cost of 
project is $18,900,000. South Fork: A rockfill dam 5, 
120 feet long with maximum height of 152 feet above 
streambed, which controls 123 square miles of drainage 
area. Reservoir provides a total storage capacity of 82, 
600 acre-feet (45,700 for flood control, 28,900 for water 
supply storage, and 8,000 for sediment reserve). 
Estimated cost of project is $16,700,000. 
Local cooperation. Construction is subject to condition 
that local interests reimburse the Federal Government 
for costs allocated to water supply at Laneport, North 
Fork, and South Fork Lakes. Reimbursement currently 
estimated at $8,956,000 for Laneport, $5,399,000 for 
North Fork, and $4,700,000 for South Fork, for a total 
of $19,055,000, exclusive of interest. Brazos River 
Authority, a State agency, is the local interests' sponsor 
of project, and by letter dated April 18, 1966, indicated 
its acceptance of the proposed plan of development and 
its willingness to pay for the costs allocated to water 
supply in each reservoir in the ultimate plan. Such 
water supply assurances for Laneport and North Fork 
Lakes were approved May 24, 1968 as satisfactory in 
accordance with requirements of the Water Supply Act 
of 1958, as amended. Contract negotiations for South 
Fork Lake will be deferred until the need for water 
supply develops and the reservoir is scheduled for 
construction. 
517

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. Regular funds: 
Continued real estate activities $804,744, and continued 
engineering and design $13,953. 
Condition at end of fiscal year. Project is about 4 percent 
complete. Real estate and engineering and design are 
approximately 7 and 29 percent complete, respectively. 
The project is in land acquisition only. 
30.. SOMERVILLE LAKE, TEX. 
Location. Dam is on Yegua Creek 20 miles upstream 
from its confluence with Brazos River and about 2 
miles south of Somerville, Tex. 
Existing project. For description of completed improvements 
and authorization act see Annual Report 
of 1969. Estimated cost of project is $27,916.000. 
Local cooperation. Construction of project is subject to 
condition that local interests contribute toward cost of 
project for water-supply storage. Brazos River Authority, 
a State agency, assume responsibility for 
disposing of water-supply storage space provided in 
project. A formal contract was approved by Secretary 
of the Army on May 10, 1962. Reimbursement is 
currently estimated at $6,741,000. 
Operations and results during fiscal year. Regular funds: 
Routine operation and maintenance continued. Pool 
elevation at start of fiscal year was 237.66 feet above 
mean sea level, corresponding to 156,200 acre-feet of 
total storage; and at the end of the fiscal year, elevation 
was 238.27 feet above mean sea level, corresponding to 
163,200 acre-feet of total storage. Maximum pool 
elevation was 243.61 feet above mean sea level on 1 
June 1970, corresponding to 232,600 acre-feet of total 
storage; minimum pool elevation was 236.01 feet above 
mean sea level on 29 October 1969 corresponding to 
138,300 acre-feet of total storage. Benefits accrued to 
Somerville project: Estimated flood damages prevented 
this fiscal year are $2,000. Accumulated 
damages prevented through fiscal year 1970 were $8, 
243,000; water supply benefits: During fiscal years 
1969 and 1970 releases of 0 and 0 acre-feet, respectively, 
were made. Accumulated releases through 
fiscal year 1970 were 7,220 acre-feet; and other water 
uses: Releases made during fiscal years 1969 and 1970 
were 148 and 784 acre-feet, respectively for low-flow 
regulation. Accumulated releases through fiscal year 
1970 for low-flow regulation were 8,340 acre-feet. (See 
Table 16-D for noteworthy rise on Yegua Creek above 
Somerville Lake.) 
Condition at end of fiscal year. Construction started in 
June 1962 and project was ready for beneficial use in 
January 1967. Completion of recreational facilities 
remains. 
31. STILLHOUSE HOLLOW LAKE, TEX. 
Location. Dam is on Lampasas River 16 miles 
upstream from its confluence with Little River, a 
tributary of the Brazos River, and about 5 miles 
southwest of Belton, Tex. 
Existing project. For description of completed improvements 
and authorization act see Annual Report 
of 1969. Estimated cost of project is $21,903,000. 
Local cooperation. Construction is subject to condition 
that local interests contribute toward cost of project for 
water-supply storage. Brazos River Authority, a State 
agency, assume responsibility of disposing of watersupply 
storage space provided in project. A formal 
contract was approved by Secretary of the Army April 
13, 1962, at an estimated cost of $6,445,000. 
Operations and results during fiscal year. Regular funds: 
Continued Routine Operations and Maintenance. 
Pool elevation at the start of fiscal year was 622.07 
feet above mean sea level, corresponding to 236,200 
acre-feet of total storage; and at the end of the fiscal 
year, elevation was 622.12 feet above mean sea level, 
corresponding to 236,500 acre-feet of total storage. 
Maximum pool elevation was 635.01 feet above mean 
sea level on 25 March 1970, corresponding to 329,100 
acre-feet of total storage; minimum pool elevation 
during this same period was 621.30 feet above mean sea 
level on 22 August 1969, corresponding to 231,200 
acre-feet of total storage. (See Table 16-D for noteworthy 
rise on Lampasas River above Stillhouse 
Hollow Lake.) Benefits accrued to Stillhouse Hollow 
Project; Accumulated estimate of flood damages 
prevented thru fiscal year 1970 is $2,365,000; Water 
supply benefits during fiscal years 1969 and 1970 
releases were 0 acre-feet each. Accumulative releases 
through fiscal year 1970 was 0 acre-feet; and other 
water uses: releases made during fiscal years 1969 and 
1970 were 1,280 and 0 acre-feet, respectively, for lowflow 
regulation. Accumulated releases through fiscal 
year 1970 for low-flow regulation were 1,980 acre-feet. 
Conditions at end of fiscal year. Construction was 
initiated in July 1962 and the project was ready for 
beneficial use in February 1968. Completion of 
recreational facilities remain. 
32. TRINITY RIVER AND TRIBUTARIES, 
TEX. 
Location. Seven improvements are in upper portion of 
Trinity River Basin (Benbrook, Lavon, Grapevine and 
Lewisville Reservoirs, and Dallas, Fort Worth and 
Richland Hills local flood protection projects) within a 
50-mile radius of Dallas, Tex., and two (Navarro Mills 
and Bardwell Lakes) are in Richland-Chambers Creek 
watershed, within 25-mile radius of Corsicana, Tex. 
Existing project. All improvements are in operation. 
Description of plan and authorizing act for Bardwell 
Project see Annual Report of 1969. For description of 
plan and authorizing act for Navarro Mills project see 
Annual Report for 1965, and for other improvements 
see Annual Report for 1962. For local flood protection 
projects, Big Fossil Creek project see Annual Report of 
1969 and Fort Worth and Dallas projects are in 
518

FORT WORTH, TEX., DISTRICT 
Annual Report for 1960. Estimated cost of improvements 
for new work is $104,440,700 including $6, 
017,000 local interests contributions for water supply 
storage in reservoirs, and $7,341,900 non-Federal cost 
on local flood control projects. (See Table 16-H 
regarding flood control works included in comprehensive 
plan; and local flood protection works; and 
Table 16-I on results of reservoir regulation on river 
stages at controlling gaging stations downstream.) 
33. WACO LAKE, TEX. 
Location. Dam is on Bosque River, 4.6 river miles 
above its confluence with Brazos River, at city of Waco, 
McLennan County, Tex. 
Existing project. For description of completed improvements 
and authorization act see Annual Report 
of 1969. Estimated cost of project is $50,084,000 
including $250,000 contributed by local interests. 
Local cooperation. Construction is subject to condition 
that local interests permit the Federal Government to 
breach existing dam and to utilize, without cost, any 
reservoir lands now controlled by city of Waco needed 
for construction and operation of project in exchange 
for water-supply storage equal to that existing in Lake 
Waco at that time. City agreed to this condition and 
stated its desire to purchase additional water-supply 
storage. On May 22, 1958, existing Lake Waco was 
transferred from city of Waco to the Federal Government. 
In formal contracts approved by Secretary of 
the Army on April 15, 1958, Brazos River Authority 
and the city of Waco agreed to fulfull all requirements 
of local cooperation. Contributed funds of $250,000 
were received April 25, 1958, from Brazos River 
Authority, and the Authority has paid $432,792 to date 
on water supply contract principal. Under terms of 
contracts the Brazos River Authority and city of Waco 
must pay 2.087 and 14.087 percent respectively toward 
annual cost of operation and maintenance. Following 
payments have been made: City of Waco $15,744, and 
Brazos River Authority $110,192. 
Operations and results during fiscal year. Regular funds: 
Routine operations and maintenance continued. 
Pool elevation at start of fiscal year was 456.86 feet 
above mean sea level, corresponding to 151,500 acrefeet 
of total storage; and at end of year, elevation was 
455.13 feet above mean sea level, corresponding to 153, 
500 acre-feet of total storage. Maximum pool elevation 
was 458.81 on 26 February 1970, corresponding to 181, 
800 acre-feet of total storage; minimum pool elevation 
was 453.38 on 5 October 1969, corresponding to 140, 
900 acre-feet of total storage. Benefits accrued to Waco 
project: Accumulated damages prevented through 
fiscal 1970 were $36,881,000 water supply benefits: 
During fiscal years 1969 and 1970 releases of 20,030 
and 23,780 acre-feet, respectively, were made. Accumulated 
releases through fiscal year 1970 were 107, 
100 acre-feet; and other water uses: Releases during 
fiscal years 1969 and 1970 for low flow regulation were 
2,640 and 8,110 acre-feet, respectively. Accumulated 
releases through fiscal year 1970 for low flow regulation 
were 29,030 acre-feet. (See Table 16-D for noteworthy 
rise on Bosque River above Waco Lake.) 
Condition at end of fiscal year. Construction was started 
in July 1958, and project was ready for beneficial use in 
February 1965. Completion of recreation facilities 
remains. 
34. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspection of completed local flood protection 
projects is made periodically in compliance with 
section 208.10 of title 33, Code of Federal Regulations, 
which contains regulations for operation and maintenance 
of local flood-protection works approved by 
Secretary of the Army in accordance with authority in 
section 3, Flood Control Act of June 22, 1936. See 
Table 16-L for inspections made this fiscal year. 
Inspection costs for fiscal year from regular funds for 
maintenance were $15,452. Total costs to 30June 1970 
were $78,991. 
35. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with Flood Control Act of 1944 
expenditures were made for scheduling flood control 
reservoir operations and preparation of reservoir 
regulation manual for Marshall Ford Dam, on the 
Colorado River, near city of Austin, Tex., and for 
preparation of reservoir regulation manual for Twin 
Buttes Dam, on Middle and South Concho Rivers near 
city of San Angelo, Tex. Marshall Ford Dam was 
authorized by 1937 River and Harbor Act. Project was 
constructed jointly by Bureau of Reclamation and 
Lower Colorado River Authority and was completed 
during fiscal year 1942. Twin Buttes Reservoir was 
authorized for construction by Department of Interior 
by Public Law 152, 85th Congress. Construction was 
initiated in June 1960; closure of dam started in June 
1962; deliberate impoundment was started January 23, 
1963. There was no significant rise on Colorado River 
above Marshall Ford Reservoir during fiscal year. 
Pool elevation in Marshall Ford Reservoir at start of 
fiscal year was 677.80 feet above mean sea level, 
corresponding to 1,112,000 acre-feet of total storage; at 
end of fiscal year, pool elevation was 683.39 feet above 
mean sea level, corresponding to 1,218,000 acre-feet of 
total storage. Maximum pool elevation was 689.82 feet 
on 25 March 1970, corresponding to 1,349,000 acrefeet 
of total storage; minimum pool elevation was 
672.58 feet on 4 October 1969, corresponding to 1,020, 
000 acre-feet of total storage. Accumulated damages 
prevented through fiscal year 1970 were $54,330,000. 
During filling stage Twin Buttes Reservoir will consist 
of two separate pools, one on South Concho River and 
the other on Middle Concho River and Spring Creek. 
Equalizing channel between these two pools is at 
519

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
elevation 1,925.0. Pool elevations in Twin Buttes 
Reservoir at start of fiscal year were 1922.75 feet in 
South Concho pool and 1885.27 in Middle Concho- 
Spring Creek pool. At end of fiscal year, pool elevations 
were 1925.37 feet in South Concho pool and 1889.18 
feet in Middle Concho-Spring Creek Pool. Maximum 
pool elevations were 1925.99 feet on 22 March 1970 in 
the South Concho pool and 1892.17 feet on 18 April 
1970 in the Middle Concho-Spring Creek pool. 
Minimum pool elevations were 1918.60 feet above 
mean sea level in the South Concho pool on 26 August 
1969, and 1881.70 feet above mean sea level in Middle 
Concho-Spring Creek pool on 26 August 1969. No 
flood damages have been prevented by Twin Buttes 
Reservoir since project began operation. Costs for fiscal 
year from regular funds for maintenance were $16,693. 
36. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 16-J.) 
37. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 
858, 80th Congress, as amended (preauthorization) 
Fiscal year costs were 0 for Lost Draw, Brownfield, 
Texas, and $7,516 for Munday, Texas, $2,565 for 
Floresville, Texas, $2,467 for Morton, Texas, $928 for 
Laredo, Texas, $1,020 for Eagle Pass, Texas, and $2, 
404 for Midland, Texas, local flood protection. 
Emergency flood control, hurricane-flood, and shore protection 
activities (Public Law 99, 84th Cong., and antecedent 
legislation) 
Fiscal year costs were $24,914 for advance preparation, 
$25,560 for emergency operation, and $9,953 
for repair and restoration, a total of $60,427. 
MULTI-PURPOSE PROJECTS INCLUDING 
POWER 
38. SAM RAYBURN DAM AND 
RESERVOIR, TEX. 
Location. Dam is on Angelina River 25.2 miles 
upstream from its confluence with Neches River and 
about 10 miles northwest of Jasper, Tex. 
Existing project. For description of completed improvements 
and authorization act see Annual Report 
1969. Estimated cost of project is $65,986,000 including 
$3,000,000 contributed by local interests. 
Local cooperation. As a unit of four-reservoir plan for 
Neches-Angelina River Basin, the project was adopted 
subject to provision that local interests give assurances 
that upon completion of entire project they will 
contribute $3 million toward first cost of work and an 
additional $200,000 annually for 50 years after 
completion of Sam Rayburn Reservoir. A formal 
contract with Lower Neches Valley Authority, a State 
agency, covering local interests' requirements was 
approved by Secretary of the Army on January 22, 
1957. Contribution of $3 million made in full. Annual 
payments in total amount of $1,000,000 have been 
received to date. A contract with the city of Lufkin, 
Texas for 18,000 acre-feet of water supply storage at an 
estimated cost of $220,000. To date Lufkin has paid $7, 
699 on the principal and $1,086 for operation and 
maintenance. 
Operations and results during fiscal year. Regular funds: 
Continued routine operation and maintenance. 
Pool elevation at start of fiscal year was 163.35 feet 
above mean sea level, corresponding to 2,779,000 acrefeet 
of total storage; and at end of fiscal year elevation 
was 162.47 feet above mean sea level, corresponding to 
2,682,000 acre-feet of total storage. Maximum pool 
elevation was 163.35 feet on 1 July 1969 corresponding 
to 2,779,000 acre-feet of total storage. Minimum pool 
elevation was 159.03 feet on 17 November 1969 
corresponding to 2,322,000 acre-feet of total storage. 
Benefits accrued to Sam Rayburn project: Accumulated 
damages prevented through fiscal year 1970 
were $25,836,000; and other water uses: Releases for 
low-flow regulation during fiscal years 1969 and 1970 
were 10 and 143 acre-feet, respectively, and accumulated 
releases through fiscal year 1970 were 18, 
530 acre-feet. During fiscal years 1969 and 1970 power 
generation was 199,180,000 and 48,972,000 kilowatthours, 
respectively. Amounts of 2,910,000 and 727,200 
acre-feet of water, respectively, were released through 
the turbines. (See Table 16-D regarding noteworthy 
rises on Angelina River above Sam Rayburn Dam and 
Reservoir.) 
Condition at end of fiscal year. Construction was started 
August 1956 and project ready for beneficial use in 
March 1965. Completion of recreation facilities remain. 
39. WHITNEY LAKE, TEX. 
Location. Dam is on Brazos River, about 442 miles 
above mouth of river, 5.5 miles southwest of Whitney, 
Tex., and about 38 miles upstream from city of Waco, 
Tex. (See Geological Survey sheets: Waco, Cleburne 
and Granbury scale 1:125,000, and Whitney, Blum, 
and Morgan, scale 1:62,500.) 
Existing project. For description of completed improvement 
and authorizing acts see Annual Report for 
1962. Estimated cost of project is $43,810,000. 
Local cooperation. Section 2, Flood Conitrol Act of June 
28, 1938, applies. 
Operations and results during fiscal year. Regular funds: 
Completed relocation of Hill County Roads $26,000 
and routine operation and maintenance. 
Pool elevation at start of fiscal year was 525.11 feet 
above mean sea level, corresponding to 462,900 acrefeet 
of total storage; and at end of fiscal year elevation 
was 521.76 feet above mean sea level, corresponding to 
407,200 acre-feet of total storage. Maximum pool 
elevation was 528.38 feet on 10 March 1970, cor- 
520

FORT WORTH, TEX., DISTRICT 
responding to 525,000 acre-feet of total storage. 
Minimum pool elevation was 521.76 feet on 30 June 
1970, corresponding to 407,200 acre-feet of total 
storage. Benefits accrued to Whitney project: Accumulated 
damages prevented through fiscal year 1970 
were $80,434,000; and other water uses: Releases for 
low-flow regulation during fiscal years 1969 and 1970 
were 0 and 1,030 acre-feet, respectively, and accumulated 
releases through fiscal year 1970 included 
55,090 acre-feet for low-flow regulation and 0 acre-feet 
for emergency rice irrigation. During fiscal years 1969 
and 1970 power generation was 89,095,000 and 80,621, 
000 kilowatt-hours, respectively. Amounts 935,000 and 
946,600 acre-feet of water, respectively, were released 
through turbines. (See Table 16-D regarding noteworthy 
rises on Brazos River above Whitney Lake.) 
Condition at end of fiscal year. Construction of project 
was started June 1946 and ready for flood control use in 
December 1951. First power was placed on-the-line in 
June 1953. Work remaining to complete project is 
completion of recreation facilities and work associated 
with raising top of power pool from elevation 520 to 
533 feet above mean sea level. 
GENERAL INVESTIGATIONS 
40. SURVEYS 
Fiscal year costs were $464,572 for flood control 
studies, $152,337 for special studies, $17,060 for 
coordination with other agencies, and $103,009 for 
comprehensive basin studies, a total of $736,978. 
41. COLLECTION AND STUDY OF BASIC 
DATA 
Work was continued under the Flood Plain Management 
Services on the compilation of information on 
floods and potential flood damages, including identification 
of those areas subject to inundation. 
Fiscal year expenditures for these activities totaling 
$235,416 were as follows: $136,039 for studies on 
Apache, Bear Furneaux, Kerby, Leon, Parker, Rosillo, 
Rush-Village, Salado and Village Creeks, Brazos and 
Bosque Rivers; $35,251 for Flood Plain Management 
Unit of the Southwestern Division office; and $17,844 
for technical services rendered to other Federal and 
non-Federal agencies. (See Table 16-K on completed 
flood plain studies.) 
42. RESEARCH AND DEVELOPMENT 
Fiscal year costs were $7,999 for hydrologic studies 
and $24,641 for civil works investigations, a total of 
$32,640. 
521

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 16-A 
See 
Section 
in Text Project 
2. Town Bluff Dam- 
B. A. Steinhagen 
Lake 
4. Trinity River 
Project, Tex. 
6. Abilene Channel 
Improvement, Tex. 
7. Bardwell Lake, 
Tex. 
8. Belton Lake, Tex. 
9. Benbrook Lake, Tex. 
10. Big Fossil Creek, 
Tex. 
(Federal Funds) 
(Contributed 
Funds) 
12. Canyon Lake, Tex. 
(Federal Funds) 
13. Duck Creek Channel 
Improvement, Tex. 
14. Elm Fork Floodway, 
Tex. 
15. Fort Worth Floodway 
(Clear Fork), Tex. 
16. Fort Worth Floodway 
(West Fork), Tex. 
17. Grapevine Lake, Tex. 
Funding 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
45,000 
60,439 
157,800 
142,790 
185,0002 
3,3652 
150,000 
104,106 
-310,000 
383,785 
106,500 
99,429 
50,000 
47,900 
198,400 
173,258 
49,800 
41,683 
146,000 
134,621 
-3,900 
60,017 
38,000 
142,811 
184,800 
169,900 
410,000 
408,937 
1,114,000 
171,271 
80,000 
73,810 
169,700 
164,347 
65,000 
62,141 
171,300 
191,145 
565,0003 
102,8304 
155,000 
177,236 
-10,000 
51,757 
142,000 
140,447 
75,000 
27,290 
240,800 
277,240 
70,000 
45,045 
159,500 
168,799 
12,000 
12,927 
174,300 
175,888 
593,000 s 
800,8936 
21,000 
105,109 
132,000 
139,406 
46,000 
89,734 
183,000 
180,263 
57,400 
65,582 
183,500 
179,044 
10,000 
13,813 
188,848 
184,979 
1,113,0008 
966,6668 
-18,998 
2,544 
21,588 
11,195 
150,444 
149,304 
98,205 
92,325 
190,643 
202,666 
4,500 
49,278 
207,655 
216,484 
1,907 
900 
91,000 
105,829 
210,500 
209,965 
950,000 
588,577 
395,000 
851,093 
97,500 
82,614 
173,200 
179,115 
53,200 
23,086 
227,450 
234,777 
35,900 
35,900 
1,250,000 
1,769,959 
200,614 
690,586 
49,500 
41,401 
188,000 
184,695 
167,551 
204,913 
244,247 
243,906 
151,098 
150,771 
52,000 
48,243 
1,185,000 
1,042,681 
245,000 
242,299 
20,910 
53,480- 
205,871 
207,928 
6,585,402 
6,581,9951 
2,328,014 
2,317,299 
2,456,0009 
1,873,754 10 
457,002 
457,002 
10,911,588 
10,901,195 
569,994 
567,911 
13,828,464 
13,812,00811 
2,014,125 
2,013,162 
11,776,562 
11,775,59412 
2,013,613 
2,017,714 
1,917,100 
1,917,100 
8,900 
8,900 
18,895,869 
18,893,53113 
1,119,847 
1,109,412 
186,998 
186,671 
52,000 
48,243 
4,225,000 
4,082,459 
3,345,000 
3,295,492 
9,172,921 
9,172,92114 
2,023,190 
2,017,563 
522

FORT WORTH, TEX., DISTRICT 
TABLE 16-A (Continued) 
See 
Section 
in Text Project 
19. Hords Creek Lake, 
Tex. 
20. Lakeview Lake, Tex. 
21. Lewisville Dam, Tex. 
(Federal Funds) 
22. Lavon Lake, Tex. 
23. Lavon Lake 
Modification & East 
Fork Channel 
Improvement, Tex. 
24. Navarro Mills Lake, 
Tex. 
25. Proctor Lake, Tex. 
26. Rutledge Hollow 
Creek Channel 
Improvement, 
Poteet, Tex. 
27. San Angelo Lake, 
Tex. 
28. San Antonio Channel 
Improvement, Tex. 
(Federal Funds) 
(Contributed Funds) 
29. San Gabriel River, 
Tributary to Brazos 
River, Tex. 
COST AND FINANCIAL STATEMENT 
Total to 
Funding FY67 FY68 FY69 FY70 June 30, 1970 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
40,000 
33,941 
84,000 
72,585 
80,000 
76,302 
651,60017 
619,206 
38,842 
52,883 
159,100 
182,877 
552,800 
254,729 
40,000 
184,105 
134,300 
124,512 
12,400 
2,811 
148,100 
133,758 
7,000 
5,083 
33,000 
31,937 
120,000 
113,602 
1,375,000 
1,571,045 
35,000 
55,000 
368,000 
310,789 
29,200 
33,811 
104,200 
113,782 
125,000 
112,542 
122,500 
101,440 
216,200 
287,962 
45,000 
42,794 
209,000 
212,724 
2,015,000 
2,188,593 
-4,200 
166 
141,600 
144,344 
-18,400 
4,834 
176,800 
188,351 
78,300 
8,103 
75,800 
69,042 
153,200 
162,047 
1,713,000 
1,650,668 
40,000 
40,000 
432,000 
585,387 
7,000 
7,413 
114,800 
115,202 
363,000 
359,921 
37,500 
60,089 
230,250 
226,277 
-5,000 
4,354 
221,000 
212,673 
2,500,000 
2,589,953 
153,000 
151,229 
19,100 
38,411 
168,450 
166,654 
63,234 
16,103 
138,000 
135,792 
900,000 
213,049 
30,000 
690,000 
703,115 
5,000 
4,621 
124,637 
126,065 
301,000 
316,358 
87,100 
72,141 
234,536 
234,927 
63 
211,977 
220,682 
2,540,000 
2,520,331 
29,107 
19,412 
168,988 
178,130 
135,000 
132,494 
197,132 
200,772 
10,320 
10,137 
10,097 
158,963 
164,238 
320,000 
1,107,483 
12,000 
42,000 
825,000 
835,727 
523 
2,567,367 
2,565,75815 
1,237,937 
1,236,548 
789,000 
788,821 
18,093,202 
18,075,62716 
3,127,243 
3,117,462 
12,518,700 
12,518,700 
2,209,307 
2,206,420 
8,182,800 
8,126,271 
9,362,907 
9,353,21218 
957,588 
956,052 
14,400,100 
14,391,898 
980,632 
977,649 
105,300 
105,300 
15,871,387 
15,871,347 
1,971,573 
1,970,649 
12,374,349 
12,335,677 
327,000 
327,000 
3,157,400 
3,156,244

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 16-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
30. Somerville Lake, New Work: 
Tex. Approp. 2,042,000 300,000 469,702 154,901 24,238,303 
Cost 2,267,885 735,304 206,448 377,493 24,229,992 
Maint. 
Approp. 66,400 152,000 213,800 299,040 731,240 
Cost 51,718 163,688 209,279 305,905 730,590 
31. Stillhouse Hollow New Work: 
Dam, Tex. Approp. 4,047,200 2,920,000 250,000 - 19,900,012 
Cost 4,094,774 2,873,776 423,258 14,202 19,899,82519 
Maint. 
Approp. - 66,000 140,900 177,452 384,352 
Cost - 62,867 139,890 179,774 382,531 
33. Waco Lake, Tex. New Work: 
Approp. 25,000 35,000 18,000 14,867 49,249,867 
Cost 246,643 89,227 25,169 15,455 49,247,97820 
Maint. 
Approp. 215,000 233,000 422,550 393,531 1,475,081 
Cost 206,447 240,498 346,534 441,067 1,435,614 
38. Sam Rayburn Dam and New Work: 
Reservoir, Tex. Approp. 2,095,000 92,600 162,486 111,300 60,416,866 
(Federal Funds) Cost 3,526,782 157,355 180,230 86,996 60,387,8182 
Maint. 
Approp. 419,000 480,700 496,700 526,722 2,319,422 
Cost 414,631 489,174 499,488 514,547 2,301,281 
39. Whitney Lake, Tex. New Work: 
Approp. 80,000 282,000 66,400 16,034 41,651,834 
Cost 57,052 157,072 140,059 89,226 41,650,71022 
Maint. 
Approp. 395,500 346,000 393,500 441,238 5,167,231 
Cost 366,431 394,421 402,828 396,521 5,119,703 
1. Excludes $2,000,000 contributed funds expended. 
2. Galveston Dist. only. 
3. Ft. Worth Dist. $140,000, Galveston Dist. $425,000. 
4. Ft. Worth Dist. $36,404, Galveston Dist. $66,426. 
5. Ft. Worth Dist. $586,000, Galveston Dist. $7,000. 
6. Ft. Worth Dist. $493,012, Galveston Dist. $307,881. 
7. Ft. Worth Dist. $1,113,000. 
8. Ft. Worth Dist. $935,462, Galveston Dist. $31,204. 
9. Ft. Worth Dist. $1,839,000, Galveston Dist. $617,000. 
10. Ft. Worth Dist. $1,464,878, Galveston Dist. $408,876. 
11. Excludes $47,309 receipts from reconveyance of land 
which were deposited to miscellaneous receipts. 
12. Excludes $322,346, receipts from reconveyance of lands, 
deposited to miscellaneous receipts. 
13. Excludes $1,422,848 expended for new work from 
contributed funds, including $22,848 'Contributed Funds, 
Other' for installation and operation of gages for leakage study. 
14. Excludes $146,795, receipts from reconveyance of lands, 
deposited to miscellaneous receipts, and $2,040,026 for new 
work expended from contributed funds. 
15. Excludes $105,079 expended from contributed funds. 
16. Excludes receipts from reconveyance of land of 
$426,606, which were deposited to miscellaneous receipts, and 
$3,676,661 for new work expended from contributed funds. 
17. Includes $130,000 under appropriation 96X5125. 
18. Excludes $300,000 expended from contributed funds. 
19. Includes receipts from disposals and revocation of funds 
related thereto. 
20. Excludes $250,000 expended for contributed funds. 
21. Includes $400,000 ARA funds. Excludes $3 million 
expended from contributed funds. 
22. Excludes $188,282, receipts from reconveyance of lands, 
deposited to miscellaneous receipts. 
524

FORT WORTH, TEX., DISTRICT 
TABLE 16-B NECHES AND ANGELINA RIVERS, TEXAS: FLOOD CONTROL 
WORKS INCLUDED IN COMPREHENSIVE PLAN 
(See Section 1 of Text) 
Rockland 1 Sam Rayburn Dam A Town Bluff 
Stream Neches Angelina Neches Neches 
Nearest city Rockland Jasper Horger Town Bluff 
Drainage area square miles 3,557 3,449 3,758 7,573 
River-miles above mouth of Neches River 160.4 151.3 142 113.7 
Height (feet) 106 120 49 45 
Type Earthfill Earthfill Concrete and earth Concrete and earth 
Flood control storage capacity (acre-feet) 1,020,100 1,145,000 None None 
Power and regulation of flow (acre-feet) 1,125,500 1,400,600 Pondage 77,600 
Powerhead and sediment reserve (acre-feet) 1,141,700 1,452,000 None 16,600 
Total storage (acre-feet) 3,287,300 3,997,600 Pondage 94,200 
Power development (kw.) 13,500 52,000 2,700 2,935 
Estimated cost $46,300,000 $65,986,0002 $3,220,000 $8,749,0003 
1. Inactive. Estimated cost as of July 1954. 3. Includes $2 million contributed funds. 
2. Includes $3 million contributed funds. NOTE: See individual reports for further details. 
TABLE 16-C OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 5 of Text) 
For Last Cost to 30 June 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Dam A Lake, Neches River, Texas1 1952 21,700 
Rockland Lake, Neches River, Texas1 1952 510,200 
1. Inactive. 
525 
451-584 0-72-34

TABLE 16-D NOTEWORTHY RISES ABOVE RESERVOIRS 
Outflow 
Coincident Corres- Estimated 
With Peak Maximum ponding Experi- Crest 
Flow from Pool Flood Appreciable enced Stage Estimated 
See Peak Flow Uncontrolled Elevation Control Overflow Crest Without Reduction 
Section Date of (cubic feet Area (feet above Storage Begins Stage Reservoir in Stage 
in Text Project Stream Peak Inflow per second) (cfs) mean sea level) (acre-feet) Town (feet) (feet) (feet) (feet) 
7. Bardwell Waxahachie 25 Apr 70 14,500 - 427.42 25,400 Corsiana, 22.6 23.6 24.6 1.0 
Lake Creek 
Texas 
8. Belton Leon River 
Lake 
Texas 
9. Benbrook Clear Fork 
Lake of Trinity 
Texas River 
21. Lewisville Elm Fork 
Dam, of Trinity 
Texas River 
17. Grapevine Denton Creek 
Lake 
Texas 
22. Lavon East Fork 
Lake of Trinity 
Texas River 
24. Navarro Richland 
Mills Lake Creek 
Texas 
25. Proctor Leon River 
Lake 
Texas 
30. Somerville Yegua Creek 
Lake, 
Texas 
31. Stillhouse Lampasas 
Hollow, River 
Lake 
Texas 
8 Mar 70 
10 Apr 70 
25 Apr 70 
26 Apr 70 
25 Apr 70 
26 Apr 70 
3 Mar 70 
26 Apr 70 
16 May 70 
7 Mar 70 
24,500 
12,800 
4,200 
47,500 
23,500 
43,900 
10,000 
7,000 
17,600 
35,000 
200 
2,500 
332 
500 
254 
28 May 70 16,000 500 
33. Waco Bosque River 7 Mar 70 
Lake 
Texas 
35. Marshall Colorado 5 Oct 69 
Ford River 
Lake, 
Texas 
39. Whitney Brazos River 26 Apr 70 
Lake, 
Texas 
18,400 
225,000 
3,900 
400 
40,000 1,400 
582.20 
579.2 
698.00 
521.00 
539.00 
479.27 
432.28 
1,162.8 
241.00 
635.0 
Texas 
115,100 Cameron, 
Texas 
85,900 Cameron, 
Texas 
15,900 Fort Worth, 
Texas 
154,600 Dallas, 
Texas 
30,900 Dallas, 
Texas 
93,600 Crardall, 
Texas 
48,800 Richland, 
Texas 
30,500 Hasse, 
Texas 
36,700 Somerville, 
Texas 
93,300 Belton, 
Texas 
624.5 16,400 Belton, 
Texas 
458.35 
678.3 
25,100 Waco, 
Texas 
5,400 Columbus, 
Texas 
526.06 52,500 Waco, Texas 
34.2 
34.2 
8.0 
30.0 
30.0 
13.5 
20.5 
12.0 
8.9 
21.0 
21.0 
27.0 
21.0 
33.0 
16.1 
1.9 
36.0 
36.0 
14.4 
17.7 
13.8 
7.8 
9.6 
7.6 
6.8 
2.1 
33.5 
16.5 
4.0 
37.0 
41.5 
19.0 
19.8 
15.0 
14.1 
29.4 
20.9 
19.9 
16.4 
0.5 
0.4 
2.1 
1.0 
5.5 
4.6 
2.1 
1.2 
6.3 
19.8 
13.3 
13.1 
14.3 
C
Cj 
M< 
0
z
zr 
0 
27.0 7.0 16.8 9.8 
(n 
N\ 
Cr,

BRAZOS RIVER AND TRIBUTARIES, TEXAS: 
FLOOD CONTROL WORKS INCLUDED IN BASINWIDE PLAN 
(See Section 10 of Text) 
Dams 
and 
Reservoirs Waco 
Stream Bosque 
Nearest City Waco 
Drainage area 
(square miles) 1,652 
Miles above 
mouth 4.6 
Height (feet) 140 
Type Concrete 
and earth 
Flood control 
storage 
capacity 
(acre-feet) 553,300 
Water-supply 
storage 
capacity 
(acre-feet) 104,100 
S Sedimentation 
Modification Stillhouse 
Proctor of Belton Hollow 
Leon Leon Lampasas' 
Proctor Belton Belton 
1,265 3,560 1,318 
238.9 16.7 16.0 
86 192 200 
Concrete Earthfill Earthfill 
and earth 
310,100 
31,400 
610,000 
372,700 
S
G
7( 
3. 
1] 
E; 
San Gabriel River 
Laneport North Fork South Fork Somerville Aquilla Millican Navasota 
an Gabriel San Gabriel San Gabriel Yegus Creek Aquilla Navasota Navasota 
ranger Georgetown Georgetown Somerville Aquilla Navasota Norman Lee 
09 246 123 1,006 294 2,120 1,341 
1.9 4.3 4.7 20 20.7 24.1 83.4 
15 165 152 80 97 83 111 
arthfill Rockfill Rockfill Earthfill Concrete Concrete Concrete 
and earth and earth and earth 
390,600 162,200 87,600 
204,900 37,900 29,200 
45,700 
28,900 
337,700 111,500 
143,900 59,700 
784,800 550,700 
680,200 1,315,400 
C
H
O
y
x
�6 
,,o 
reserve H 
capacity 
(acre-feet) 69,000 32,700 81,900 31,900 44,100 14,000 8,000 25,900 28,100 92,400 69,500 
Capacity, total 
(acre-feet) 726,400 374,200 1,097,600 630,400 244,200 130,800 82,600 507,500 199,300 1,557,400 1,935,600 
Estimated 
total cost 
(July 1970) $50,084,0001 $15,124,000 $8,290,0002,3 $21,903,000 $42,800,000 $18,900,000 $14,700,000 $27,916,000 $31,800,000 $90,000,000 $88,800,000 
1. Includes $250,000 non-Federal contribution. 
2. Includes undetermined amount of local contribution for conservation storage. 
3. Deferred for restudy. Estimate as of July 1958. 
TABLE 16-E 
ti

TABLE 16-F 
REPORT OF THE CHIEF OF ENGINEERS. U.S. ARMY 1970 
BRAZOS RIVER AND TRIBUTARIES, TEXAS: 
RESULTS OF RESERVOIR REGULATION ON RIVER STAGES AT 
CONTROLLING GAGING STATIONS DOWNSTREAM 
(See Section 11 of Text) 
Flood Period Waco Hasse Cameron Valley Junction4 Richmond s 
Controlling Gaging Station 
Appreciable overflow begins at (feet) 27.0 12.0 34.2 45.0 32.0 
Experienced Crest Stage (feet) 
March 1970 6.8 13.6 33.0 21.2 21.4 
April 1970 7.0 13.8 19.8 12.4 11.5 
Estimated Crest Stage Without Reservoirs (feet) 
March 1970 19.9 14.2 34.0 20.7 24.5 
April 1970 20.5 15.0 20.2 16.0 13.6 
Estimated Reduction in Stage (feet) 
March 1970 13.1 0.6 1.0 5.8 3.1 
April 1970 13.5 1.2 0.4 3.6 2.1 
1. Modified by Whitney and Waco Lakes. 4. Modified by Whitney, Waco, Belton, Proctor, and Stillhouse 
2. Modified by Proctor Lakes. Hollow Lakes. 
3. Modified by Belton, Proctor and Stillhouse Hollow Lakes. 5. Modified by Whitney, Waco, Belton, Proctor, Stilihouse 
Hollow, and Somerville Lakes. 
TABLE 16-G GUADALUPE AND SAN ANTONIO RIVERS, TEXAS: 
FLOOD CONTROL WORKS INCLUDED IN PLAN OF IMPROVEMENTS 
(See Section 18 of Text) 
Gonzales Dam and Lake 1 
Stream San Marcos 
Nearest city Gonzales 
Drainage area square miles 1,344 
Distance above mouth (miles) 5.4 
Height (feet) 102 
Type Concrete and Earth 
Flood control storage capacity (acre-feet) 413,200 
Water-supply storage capacity (acre-feet) 100,800 
Sedimentation reserve capacity (acre-feet) 25,000 
Capacity, total (acre-feet) 539,000 
Estimated cost: 
Construction $21,834,000 
Lands and damages 11,566,000 
Total (July 1964) $33,400,000 
Local Flood Protection Works 
Miles 
Above Type Lands and 
Location Stream Mouth Structure Construction Damages Total 
San Antonio San Antonio River 221.8 Channel $28,700,000 $23,500,000 $52,200,0002 
and tributaries 237.3 rectification 
1. Project classified inactive. 
2. Includes $24,300,000 non-Federal costs. 
528

FORT WORTH, TEX., DISTRICT 
TABLE 16-H TRINITY RIVER AND TRIBUTARIES, TEXAS: 
FLOOD CONTROL WORKS INCLUDED IN COMPREHENSIVE PLAN 
(See Section 32 of Text) 
Navarro 
Dams and Lakes Benbrook Lavon Grapevine Lewisville Mills Bardwell 
Stream Clear Fork East Fork Denton Creek Elm Creek Richland Creek Waxahachie 
Nearest city Benbrook Lavon Grapevine Lewisville Dawson Ennis 
Drainage area (square miles) 429 770 695 1,600 320 178 
Miles above mouth 15.0 55.9 11.7 30.0 63.9 5.0 
Height (feet) 130 69 137 125 81.7 82.4 
Type Earthfill Concrete gravity Earthfill Earthfill Earthfill Earthfill 
and earth 
Flood control storage capacity 170,350 275,600 238,250 525,200 143,200 79,600 
(acre-feet) 
Water supply storage capacity 72,500 100,000 161,250 436,000 53,200 42,800 
(acre-feet) 
Sedimentation reserve capacity 15,750 47,800 36,000 28,500 15,800 17,600 
(acre-feet) 
Capacity, total (acre-feet) 258,600 423,400 435,500 989,700 212,200 140,000 
Estimated Cost: 
Total (1970) $12,141,000 $12,518,700 $12,063,000 ' $23,492,0002 $10,106,0003 $12,630,000 
1. Includes $2,040,000 non-Federal costs. 
2. Includes $3,677,000 non-Federal costs. 
3. Includes $300,000 non-Federal costs. 
LOCAL FLOOD PROTECTION WORKS 
Miles 
Above Total 
Location Stream Mouth Type Structure Estimated Cost 
Fort Worth Clear and West Forks 560 Levee and channel clearing $9,524,000 (July 1960)4 
Dallas Elm Fork and Trinity River 505 Levee channel clearing and modification of 9,848,000 (July 1960)5 
interior drainage. 
Richland Hills Big Fossil Creek 1.5 Levee and channel improvement and interior 2,118,000 (July 1968)6 
drainage structures. 
4. Includes $5,643,000 non-Federal costs. 
5. Includes $1,498,000 non-Federal costs. 
6. Includes $200,900 non-Federal costs. 
529

TABLE 16-I 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TRINITY RIVER AND TRIBUTARIES, TEXAS: 
RESULTS OF RESERVOIR REGULATION ON RIVER STAGES AT 
CONTROLLING GAGING STATIONS DOWNSTREAM 
(See Section 32 of Text) 
Flood Period Fort Worth Dallas2 Crandall3 Rosser 4 Richland5 Corsicana6 Oakwood7 
Controlling Gaging Station 
Appreciable overflow begins at (feet) 8.0 30.0 13.5 26.0 20.5 22.6 40.0 
Experienced Crest Stage (feet) 
April 1970 1.9 36.0 14.4 31.0 17.7 23.6 35.0 
Estimated Crest Stage Without Reservoir (feet) 
April 1970 4.0 38.0 19.0 35.0 19.8 24.6 43.8 
Estimated Reduction in Stage (feet) 
April 1970 2.3 2.0 4.6 4.0 2.1 1.0 8.8 
1. Modified by Benbrook Lake. 5. Modified by Navarro Mills Lake. 
2. Modified by Benbrook, Grapevine, and Garza-Little Elm 6. Modified by Bardwell Lake. 
Lakes. 7. Modified by Benbrook, Grapevine, Garza-Little Elm, Lavon, 
3. Modified by Lavon Lake. Bardwell, and Navarro Mills Lakes. 
4. Modified by Benbrook, Grapevine, Garza-Little Elm, and 
Lavon Lakes. 
TABLE 16-J OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 36 of Text) 
For Last Cost to 30 June 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Aquilla Lake, Aquilla Creek, Tex.1 
Belton Lake, Leon River, Tex. (Mod) 2 
Blieders Creek Lake, Tex.3 1965 37,600 
Brownwood Channel Improvement, Tex. 1 
Gonzales Lake, San Marcos Riv, Tex.4 
Lake Brownwood Dam Modification, Tex.- 
Millican Lake, Navasota Riv, Tex. 1 
Navasota Lake, Navasota Riv, Tex. 1 
Pecan Bayou Lake, Pecan Bayou, Tex. 1 
1. Authorized by Flood Control Act of 1968. Awaiting 
availability of funds. 
2. Deferred for restudy due to lack of economic justification. 
Authorized by Flood Control Act of 1954. 
3. Inactive. Authorized by Flood Control Act of 1960. 
4. Inactive. Authorized by Flood Control Act of 1954. 
530

FORT WORTH, TEX., DISTRICT 
COMPLETED FLOOD PLAIN STUDIES 
(See Section 41 of Text) 
TABLE 16-K 
Date Federal 
Location Requesting Agency Completed Cost 
West Fork, Trinity River Texas Water Commission and Tarrant County Water Control and Feb 1964 $11,400 
Improvement District No. 1 
Duck Creek, Dallas County, City and County of Dallas, Texas Flood Control Committee and Mar 1968 20,198 
Texas Texas Water Development Board 
Tenmile Creek, Dallas County, City and County of Dallas, Texas Flood Control Committee, and May 1968 17,797 
Texas Texas Water Development Board 
South Mesquito Creek, Dallas City and County of Dallas, Texas Flood Control Committee, and Jun 1968 14,394 
County, Texas Texas Water Development Board 
Cottonwood Creek, Dallas Grand Prairie and Arlington, Texas and County of Dallas, Texas Mar 1969 17,000 
County, Texas Flood Control Committee and Texas Water Development Board 
Delaware Creek, Dallas County, Irving, Texas, and County of Dallas, Texas Flood Control Committee May 1969 23,000 
Texas and Texas Water Development Board 
Hutton and Cooks Branch, City and County of Dallas, Texas Flood Control Committee and Oct 1968 21,800 
Dallas County, Texas Texas Water Development Board 
Johnson Creek, Dallas County, Arlington and Grand Prairie, Texas, and County of Dallas, Texas Dec 1968 17,000 
Texas Flood Control Committee and Texas Water Development Board 
Salado Creek, Bexar County, San Antonio River Authority and the Texas Water Development Nov 1969 37,761 
Texas Board 
Rosillo Creek, Bexar County, San Antonio River Authority and the Texas Water Development Jan 1970 16,800 
Texas Board 
Parker Creek City of Marshall, Texas and the Texas Water Development Board May 1970 12,000 
Brazos & Bosque Rivers City of Waco, Texas and the Texas Water Development Board May 1970 20,000 
Village Creek, Johnson City of Burleson, Texas and the Texas Water Development Jun 1970 25,100 
& Tarrant Counties, Texas Board 
TABLE 16-L INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 34 of Text) 
Location Dates of Inspection 
Dallas Floodway, Texas February 1970 
Fort Worth Floodway, Texas July 1970 
Pleasanton Floodway, Texas December 1969 and May 1970 
Completed portions of San Antonio February 1970 and May 1970 
Channel Improvements, Texas 
Big Fossil Creek, Texas February 1970 
Poteet Channel Improvement, Texas December 1969 
531

ALBUQUERQUE, N. MEX., DISTRICT * 
The district comprises watershed of Canadian River 
and tributaries entering river west of Texas-New 
Mexico State line; watershed of Arkansas River and 
tributaries entering river west of and including Walnut 
Creek, Kans.; watershed of Rio Grande and tributaries 
entering river west of and including Pecos River and its 
tributaries; and watershed of Mimbres River and its 
tributaries in New Mexico. 
IMPROVEMENTS 
Flood Control Page 
1. Albuquerque diversion channels project, 
New M exico ......................................... . 533 
2. Conchas Lake, Canadian River, N. 
Mex. ........................................ 534 
3 Dodge City local protection project, 
K ansas ........................ ...................... 554 
4. El Paso local protection project, Texas 535 
5. Great Bend local protection project, 
K ansas ................................................ 
6. John Martin Reservoir, Arkansas 
River, Colo. ...................... .................. 
7. Las Animas local protection project, 
Colo. .............. .......................... 
8. Las Cruces local protection project, 
New Mexico ............................. 
9. Los Esteros Lake and modification of 
Alamogordo Dam, Pecos River, New 
M exico .................... ......................... 
10. Rio Grande Basin, N. Mex. ......... 
10A. Abiquiu Dam, Rio Chama, N. Mex. ... 
536 
536 
537 
537 
Flood Control (cont.) Page 
10B. Cochiti Lake, N. Mex. ......................... 540 
10C. Galisteo Dam, N. Mex. ........................ 540 
10D. Jemez Canyon Dam, N. Mex ............. 540 
10E. Rio Grande Floodway, N. Mex. ........... 541 
11. Trinidad Lake, Purgatoire River, Colo. 541 
12. Two Rivers Dam, N. Mex. .................... 542 
13. Inspection of completed flood control 
projects ....................................... 543 
14. Scheduling flood control reservoir 
operations ................................... 543 
15. Other authorized flood control projects 543 
16. Preauthorization studies in interest of 
potential projects ................................ 543 
17. Flood Control work under special 
authorizations ..................................... 543 
538 18. 
539 19. 
539 20. 
General Investigations 
Surveys ........................................ 543 
Collection and study of basic data ....... 543 
Research and development .................. 543 
FLOOD CONTROL 
1. ALBUQUERQUE DIVERSION 
CHANNELS PROJECT, NEW MEXICO 
Location. In area which comprises watersheds of 
ephemeral streams entering a 15-mile reach of Rio 
Grande from the east at Albuquerque, N. Mex., and 
vicinity. Combined drainage area of tributaries is 
about 276 square miles. Sandia Range of the Rocky 
Mountains, which is about 12 miles east of Rio Grande, 
forms eastern border of watersheds. Crest of mountain 
range rises more than a mile above river to an elevation 
of 10,692 feet above mean sea level. (See Geological 
Survey Map, Albuquerque, N. Mex., quadrangle, scale 
1:62,500.) 
Existing project. There is a serious flood problem on 
tributaries of Rio Grande from east in Bernalillo 
County, Albuquerque, N. Mex., and vicinity. Small 
detention dams, constructed by city on several of these 
tributary arroyos, are not adequate to control floods. 
* All cost and financial statements for projects are listed at the 
appear at the end of this chapter. 
Flash floods originating on steep slopes of Sandia 
Mountains inundate large portions of highly developed 
lowlands area adjacent to river. Central business 
district, mainland and division shops of Atchison, 
Topeka & Santa Fe Railway, Federal and State 
highways, and commercial, industrial, residential, and 
suburban properties in lowlands are subject to flood 
damages. Plan of improvement consists of north and 
south diversion channels on high ground east of and 
parallel to valley. Channels are designed to carry floods 
equal in magnitude to standard project flood from all 
tributaries. Estimated Federal cost is $17,500,000. 
Estimated non-Federal cost, including required cash 
contribution of $530,000 is $11,060,000. Lands and 
damages costs are responsibility of local interests. (See 
Table 17-B for authorizing legislation.) 
Local cooperation. In addition to usual requirements, 
local interests must alter existing improvements, other 
than railroads, and prevent further encroachment 
end of this chapter. All other tables are referenced in text and also 
533

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
upon existing defined waterways of tributaries by 
zoning or other means, or construct adequate waterways, 
or provide other drainage facilities to prevent 
flood problems in heights area of Albuquerque from 
developing into one of serious proportions. Local 
cooperation requirements also include cash contribution 
toward cost of construction in lump sum 
amounts equivalent to about 1.3 percent of total first 
cost of north diversion channel and about 3.4 percent of 
total first cost of south diversion channel. Total 
estimated cost to local interests, including cash contribution 
toward cost of construction is $11,060,000. 
Preconstruction planning was initiated in 1956. Work 
was stopped in fiscal year 1959 as a result of failure of 
local interests to comply with requirements. On 
November 21, 1958, 5-year notice of expiration of 
project authorization was issued to local interests. By 
act of State Legislature of New Mexico in 1963, 
Albuquerque Metropolitan Arroyo Flood Control 
Authority was created to provide local sponsorship for 
project subject to election of Board of Directors and 
approval of bond issue to provide funds for the 
authority. On August 27, 1963, voters approved a $9.5 
million bond issue for funding necessary local cooperation 
costs and elected a board of directors to serve 
as its governing body. Formal assurances were accepted 
by district on November 19, 1963. An additional bond 
issue to cover increase in non-Federal cost was 
approved by voters in general election November 8, 
1966. 
Operation and results during fiscal year. Construction of 
AT&SF Railroad main line crossing on south diversion 
channel was completed July 22, 1969. Construction of 
phase 1 of the south diversion channel, including 
relocation of Sandia Base (AEC) spur bridge and 
Kirtland AFB and Industrial Park spur tracks, was 
started March 2, 1970. Planning work on phase 2 of the 
south diversion channel was continued. 
Condition at end of fiscal year. Project planning is 
approximately 98 percent complete. Construction of 
the north channel is complete. Construction of the 
south channel is about 11 percent complete. Entire 
project is about 75 percent complete. 
2. CONCHAS LAKE, CANADIAN RIVER, 
N. MEX. 
Location. Dam is in San Miguel County, N. Mex., on 
Canadian River, about one-fourth mile downstream 
from confluence of Canadian and Conchas Rivers. It is 
about 30 miles northwest of Tucumcari, N. Mex., and 
743 miles upstream from mouth of Canadian River. 
Canadian River is about 906 miles long, rises in 
northeastern part of New Mexico, and flows south and 
east to Arkansas River near Webbers Falls, Okla. (See 
Geological Survey State map of New Mexico, scale 
1:500,000, and Geological Survey topographic map, 
Tucumcari quadrangle, scale 1:125,000.) 
Existing project. A concrete gravity main dam section 
1,250 feet long with a maximum height of 200 feet 
above streambed located in Canadian River Canyon 
together with earth dikes on each side having an 
overall length of about 3.7 miles. Main section contains 
conduits in its base for release of water to maintain low 
flows and for drainage of reservoir, and an overflow, 
ungated spillway 300 feet long. Earth dikes vary in 
height up to 100 feet and north dike contains a concrete 
ogee-type emergency spillway 3,000 feet long. Reservoir 
has a gross storage capacity of 550,800 acre-feet 
(198,200 for flood control, 273,000 for water conservation 
and irrigation, and 79,600 dead storage). 
Dam controls 7,409 square miles of drainage area. 
Federal cost was $15,811,171, including $2,279,326 for 
initiating construction of project under authority of 
Emergency Relief Appropriation Act of 1935. (See 
Table 17-B for authorizing legislation.) 
Local cooperation. None required. 
Operations and results during fiscal year. Operation of 
reservoir continued. Reservoir was operated for storage 
of floodwaters and releases for irrigation purposes. 
Estimated total accumulated flood damages prevented 
by project through fiscal year 1969 were $248,000. 
Estimated irrigation benefits for fiscal year 1969 were 
$235,200. Estimated total accumulated irrigation 
benefits through fiscal year 1969 were $5,312,847. Pool 
elevation at start of fiscal year was 4,187.80 feet, with 
corresponding storage of 240,484 acre-feet. Maximum 
pool elevation of 4,197.55 feet, with corresponding 
storage of 319,966 acre-feet, occurred April 23, 1970. 
Pool elevation did not exceed spillway crest (elevation 
4,201 feet) during fiscal year. Irrigation releases were 
terminated October 16, 1969, and spring irrigation 
releases began March 17, 1970. Total releases for fiscal 
year were 90,276 acre-feet (89,096 for irrigation, and 1, 
180 miscellaneous losses). Releases of 86,878 acre-feet 
were made to Arch Hurley Conservancy District and 2, 
218 to Bell Ranch. Pool elevation on June 30, 1970, 
was 4,193.18 feet with corresponding storage of 282,121 
acre-feet. 
Condition at end of fiscal year. Existing project was 
essentially complete in 1940. Reservoir and appurtenances 
are in good condition and in operation. 
Irrigation of some lands under project was begun in 
November 1945. 
3. DODGE CITY LOCAL PROTECTION 
PROJECT, KANSAS 
Location. At Dodge City, Ford County, Kans., on 
Arkansas River about 130 miles downstream from 
Colorado-Kansas State line. (See Geological Survey 
map for Dodge quadrangle, scale 1:125,000.) 
Existing project. About 7 miles of levees of about 8.3 
feet average height on both banks of Arkansas River 
(4.3 miles on left bank and 2.6 miles on right bank) and 
enlargement of river channel to form a floodway about 
470 feet wide which will convey a flow of 40,000 cubic 
feet per second through city. Levees will be protected 
by flexible-type steel jetties. Four reaches of floodwalls 
about 100 feet long will be provided to insure 
continuity between levees and bridge abutments. 
Project also includes relocation of a railroad bridge and 
534

ALBUQUERQUE, N. MEX., DISTRICT 
grade raise. Appurtenant works include interior 
drainage structures and fencing, a pumping plant for 
disposal of sanitary sewage during high water periods, 
and minor alterations to local roads and a sanitary 
sewerline. As result of the very damaging flood of June 
1965 on the Arkansas River, which peaked at about 82, 
000 c.f.s. at Dodge City, consideration was given to 
modification of project design to increase protection to 
maximum extent practicable without causing substantial 
increase in Federal and non-Federal costs. Plan 
adopted is based on a design flow of 40,000 c.f.s. with 
the added requirement that top of levees would not be 
lower than the profile for 60,000 c.f.s. flow. Revised 
frequency curves prepared since 1965 flood indicate 40, 
000 c.f.s. flow would occur about once in 63 years and 
82,000 c.f.s. flow about once in 250 years. These 
frequency curves also show that a 90-year frequency 
has a discharge of about 48,000 c.f.s., and it has been 
determined such a flow could be safely passed through 
the floodway as presently designed. The raise in top of 
levee to 60,000 c.f.s. profile would increase carrying 
capacity of floodway, but under such a plan the bridges 
on Second Street and 14th Avenue would not be raised. 
Sandbagging of the bridge crossings would be required 
during floods of that magnitude. 
Estimated Federal cost is $3,100,000. Cost of lands 
and damages is responsibility of local interests. (See 
Table 17-B for authorizing legislation.) 
Local cooperation. In addition to usual requirements, 
local interests must acquire easement for flood-zoning 
purposes in areas that would be used for ponding of 
interior drainage waters and hold United States free 
from claims as a result of flooding from residual interior 
drainage during operation of project; alter existing 
improvements, other than railroads, including provision 
of a sewage disposal pumping plant; inform all 
individuals concerned about residual flooding problem 
involved owing to temporary ponding; and provide 
assurances that encroachment on improved river 
channels, interior drains, and ponding areas will not be 
permitted; and if ponding areas and capacities are 
impaired, provide substitute storage capacity or equivalent 
pumping capacity. A bond issue for flood 
control purposes "in an amount not to exceed $700, 
000" was approved by the voters October 12, 1965. 
Formal assurances were received March 25, 1970. 
Estimated non-Federal cost is $710,000. 
Operations and results during fiscal year. Preconstruction 
planning was continued. Design of the railroad bridge 
relocation was initiated under a cost reimbursable 
contract on June 30, 1970. 
Condition at end offiscalyear. Preconstruction planning 
is about 91 percent complete. The hydrology design 
memorandum and revised general design memorandum 
are complete. 
4. EL PASO LOCAL PROTECTION 
PROJECT, TEXAS 
Location. At El Paso, El Paso County, Tex., which is 
on left bank of Rio Grande in reach that forms part of 
international boundary between United States and 
Republic of Mexico. (Geological Survey map for El 
Paso, Tex.; New Mexico quadrangle, scale 1:250,000.) 
Existing project. Consists of a single-purpose flood 
control system of detention dams, diversion dikes, and 
channels to collect, regulate, and discharge arroyo 
runoff into Rio Grande. Runoff from tributary arroyos 
on eastern, southern, and western slopes of adjacent 
Franklin Mountains often inundates sections of city 
and its outlying suburban developments. Project is 
divided into four independent elements: Northwest 
area, Central area, and two units (Copper System and 
Bluff Channel) in Southeast area. Improvements for 
Central area and Copper System of Southeast area are 
authorized for construction as soon as practicable, 
whereas construction of remainder of project 
(Northwest area and Bluff Channel of Southeast area) 
is to be deferred until construction is initiated by 
International Boundary and Water Commission on 
improvements which may be required to increase 
capacity of Rio Grande and its floodway. Elements 
authorized for construction as soon as practicable 
consist of seven reservoirs plus diversion and outlet 
channels in Central area to operate in conjunction with 
existing facilities and two reservoirs together with 
diversions and an outfall channel in Copper System of 
Southeast area. Deferred elements include three 
reservoirs and a diversion channel with appurtenances 
in Northwest area and Bluff Channel in Southeast area 
to intercept arroyo flows above area of principal 
damage and convey them to Rio Grande. Estimated 
Federal cost is $17,600,000. (See Table 17-B for 
authorizing legislation.) 
Authorized plans of improvement as recommended 
in survey report for Northwest area and Southeast area 
(Bluff Channel) would change flow conditions in Rio 
Grande through reach which forms part of international 
boundary between United States and 
Mexico. Proposed flood control project would collect 
and divert interior runoff which now ponds on valley 
floor and which would be discharged into this reach of 
river. Recommended plan was authorized subject to 
review and analysis of need for levee enlargement and 
channel improvement on Rio Grande by IB & WC. IB 
& WC has determined that it is not feasible to increase 
discharges into river as proposed in recommended plan 
and has stated that it would not serve best interests of 
United States to undertake necessary levee enlargement 
and channel improvements involved on Rio 
Grande. Instead, IB & WC recommends adoption of 
Plan B for the Northwest area as presented in survey 
report, which calls for four additional dams and 
minimum diversion channel work but which would 
cost about $4,000,000 additional. Boundary Commission 
would justify this plan by supporting additional 
costs. For Southeast area it recommends Plan 
C as presented in survey report which would substitute 
two dams for Bluff Channel at no extra cost over 
authorized plan. 
535

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Local cooperation. In addition to usual requirements, 
local interests must alter existing improvements, other 
than railroads or improvements constructed and 
maintained by United States, prevent encroachment 
on all of project works which would reduce their design 
capacities; take steps to prevent encroachment upon 
existing defined waterways tributary to project by 
zoning or other means such as enlargements, or other 
modifications, of existing waterway facilities to prevent 
minor flood problems in these tributary waterways 
from developing into problems of serious proportions; 
and inform all concerned that project is designed to 
control floods originating above structures and that 
some residual flooding may be expected from precipitation 
occurring below structures. Estimated non- 
Federal cost is $3,800,000. 
Operations and results during fiscal year. Preconstruction 
planning of Central area and Copper System of 
Southeast area was continued. Plans and specifications 
for a portion of Fort Bliss Sump and Mountain Avenue 
Outlet Conduit were completed during the fiscal year. 
Condition at end of fiscal year. Preconstruction planning 
is about 95 percent complete. 
5. GREAT BEND LOCAL PROTECTION 
PROJECT, KANSAS 
Location. At Great Bend, Barton County, Kans., on 
left bank of Arkansas River at river mile 873, about 4.5 
miles upstream from confluence of Walnut Creek with 
Arkansas River. (See Geological Survey map, Great 
Bend quadrangle, scale 1:250,000.) 
Existing project. Consists of 6.2 miles of leveed channel 
to divert Walnut Creek floodflows around and upstream 
from city into Arkansas River; a leveed channel 
1.5 miles long to direct Little Walnut Creek floodflows 
into Walnut Diversion Channel; 6 miles of improved 
channel with levees along Arkansas River; a tieback 
levee 4.3 miles long on left bank of Arkansas River 
upstream from junction with Walnut Diversion Channel; 
alteration or relocation of two railroad bridges; 
and appurtenant facilities. Project will protect city of 
Great Bend and vicinity from Arkansas River flows up 
to 86,000 cubic feet per second and Walnut Creek flows 
of 26,000 cubic feet per second. Estimated Federal cost 
is $5,880,000. (See Table 17-B for authorizing legislation.) 
Local cooperation. In addition to usual requirements, 
local interests must provide easements for flood zoning 
purposes in ponding areas; hold United States free 
from claims as a result of flooding from residual interior 
runoff during operation of project; inform periodically 
all concerned that some flooding will continue to occur 
because of temporary ponding; prohibit any encroachment 
on design capacities of river channel, 
diversion channels, interior drains, and ponding areas; 
and if ponding area capacities are impaired, provide 
promptly, without cost to United States, substitute 
storage or equivalent pumping capacity; alter existing 
improvements, other than railroad bridges and approaches 
connected therewith; provide fences on both 
sides of Walnut diversion channel for structural 
protection and as a safety measure during periods of 
high flow. In addition, construction of the flood control 
works will be initiated concurrently with or subsequent 
to replacement of U.S. Highway 281 bridge across 
Arkansas River. A bond issue to finance requirements 
was defeated in special election on August 10, 1965. 
Since defeat of initial bond issue, City Council initiated 
a campaign to better acquaint people in community 
with proposed project. On April 2, 1968, a bond issue 
was again defeated. Governing Body of Great Bend is 
proceeding with further studies and hopes to again 
present bond issue to the people. Estimated non- 
Federal cost is $2,090,000. 
Operation and results during fiscal year. Project planning 
has been held in abeyance since defeat of bond issue. 
Condition at end of fiscal year. Preconstruction is about 2 
percent complete. 
6. JOHN MARTIN RESERVOIR, 
ARKANSAS RIVER, COLO. 
Location. On Arkansas River 1, 159 miles upstream 
from its mouth, 300 miles downstream from its source, 
in Bent County, about 18 miles upstream from city of 
Lamar, Colo. (See Geological Survey maps for Lamar 
and Las Animas (Colo.) quadrangles, scale 1:125,000.) 
Existing project. A concrete and earthfill structure 
about 2.6 miles long with a maximum height of 130 feet 
above streambed and an overflow, gated spillway 1,174 
feet long. On basis of sediment resurvey, new areacapacity 
curves show reservoir storage capacity of 618, 
700 acre-feet (261,000 for flood control and 357,700 for 
conservation and recreation storage). Reservoir controls 
a drainage area of 18,915 square miles and is 
operated as a unit of coordinated reservoir system for 
flood control in Arkansas River Basin. Federal cost was 
$15,173,389. (See Table 17-B for authorizing legislation.) 
Public Law 89-298 modified the act of June 
22, 1936 (49 Stat. 1570) to authorize and direct Chief of 
Engineers to use, not to exceed, 10,000 acre-feet of 
reservoir flood control storage space for fish and 
wildlife and recreation purposes. The Chief of Engineers 
provided this space and set top elevation of 
conservation, fish and wildlife and recreation pool at 
elevation 3,851.83 feet contingent upon stipulations 
and limitations of said act. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies. 
Operations and results during fiscal year. Ordinary 
maintenance and operation continued. Regulation of 
conservation storage continued under rules and regulations 
of Arkansas River Compact. Estimated flood 
and sediment damages prevented during fiscal year 
1969 were $209,440. Estimated total flood and sediment 
damages prevented by project through fiscal 
year 1969 were $72,380,000. Estimated irrigation 
benefits for fiscal year 1969 were $1,105,800. Estimated 
total accumulative irrigation benefits through fiscal 
year 1969 were $18,563,729. Maximum pool elevation 
of 3810.88 feet with corresponding storage of 57,852 
536

ALBUQUERQUE, N. MEX., DISTRICT 
acre-feet occurred on April 19, 1970. Total releases for 
fiscal year were 181,516 acre-feet (181,464 for irrigation 
and 52 unidentified losses). Releases attributed 
to irrigation benefits amounted to 85,527 acre-feet. 
Reservoir was empty from July 13-17, 1969; July 27- 
Aug. 21, 1969; Sept. 1-7, 1969; and May 28-June 30, 
197,0. Winter storage was in effect from November 1 
until April 10. 
Condition at end of fiscal year. Storage and operation of 
reservoir for irrigation began in March 1943. Construction 
of dam and appurtenances was completed in 
October 1948 and are in good condition and in 
operation. 
7. LAS ANIMAS LOCAL PROTECTION 
PROJECT, COLO. 
Location. At Las Animas, Bent County, Colo., at river 
mile 1,175 on Arkansas River, just upstream from its 
confluence with Purgatoire River, a major tributary 
that enters Arkansas River from south. (See Geological 
Survey map, Lamar, Colo.; Kans. quadrangle, scale 
1:250,000.) 
Existing project. Consists of a levee 9.6 miles long on 
south bank of Arkansas River and a levee about 1 mile 
long on north bank. Appurtenant works include levee 
protection measures; an interior drainage system 
consisting of outlet structures, a ditch, and ponding 
areas; and intake structures for irrigation canals. 
Design flood is 140,000 cubic feet per second, which is 
equivalent to flood of record (June 1921 flood with 
peak discharge of 187,000 cubic feet per second, 
reduced by regulatory effect of Barrier Dam, near 
Pueblo, Colo., which was placed in operation shortly 
after June 1921 flood). Estimated Federal cost is $2, 
280,000. (See Table 17-B for authorizing legislation.) 
Local cooperation. In addition to usual requirements, 
local interests must at least annually inform individuals 
concerned about residual flood problem involved 
owing to temporary ponding; prevent encroachment 
on river channel, which would reduce design flow 
capacity through leveed section and on ponding areas 
and interior drains; and if ponding area is impaired, 
provide substitute storage or equivalent pumping 
capacity promptly without cost to United States; and 
alter existing improvements, other than railroad 
bridges and approaches in connection therewith. In 
addition, construction will begin concurrent with or 
subsequent to replacement of United States Highway 
50 bridge across Arkansas River; and in event local 
interests desire to create planned fishing lake at time 
Federal project is constructed, they must contribute 
cost of excavating fishing lake in excess of cost of 
borrow material from least costly alternative source 
currently estimated at $33,000, and hold United States 
free from water rights claims. Construction of U.S. 
Highway 50 bridge across Arkansas River has been 
completed. 
Inasmuch as the flood control project extends 
beyond the corporate city limits of Las Animas, 
Colorado, the Arkansas River Conservancy District, 
Las Animas, Colorado, a political subdivision duly 
constituted and organized under the laws of the State of 
Colorado, is the sponsoring agency which will furnish 
required local cooperation. Conservancy District has 
jurisdiction and power to levy taxes both in the city and 
in those areas outside city limits affected by the project. 
Prior to authorization of project, the Conservancy 
District pledged in writing that it favored project and 
would furnish required local cooperation. Estimated 
non-Federal cost is $280,000. 
Operations and results during fiscal year. Preconstruction 
planning was continued. 
Condition at end of fiscal year. Preconstruction planning 
is about 90 percent complete. 
8. LAS CRUCES LOCAL PROTECTION 
PROJECT, NEW MEXICO 
Location. On tributaries of Rio Grande at Las Cruces, 
Dona Ana County, N. Mex., about 87 miles downstream 
from Elephant Butte Dam. (See Geological 
Survey Map for Las Cruces, N. Mex., quadrangle, 
scale 1:62,500.) 
Existing project. Consists of two dams, Las Cruces 
Dam, which extends across Alameda and Las Cruces 
Arroyos, and Campus Dam, on Campus Arroyo. Both 
will be provided with uncontrolled outlets and spillways. 
Las Cruces Dam, about 1,000 feet east of Las 
Cruces city limits, will be earthfill construction about 
15,570 feet long and 67 feet high with both slopes 
protected. Discharges from dam will be conveyed 
downstream in channel of Alameda Arroyo for about 
10,968 feet and then by means of an unlined, 
trapezoidal channel for about 13,910 feet to Rio 
Grande. Reservoir capacity is 13,200 acre-feet at 
maximum water surface and 8,200 acre-feet at spillway 
crest. Controlled drainage area is 28.9 square miles. 
Campus Dam will be a small earthfill structure 1,790 
feet long and 34 feet high located on Campus Arroyo 
immediately upstream from campus of State University. 
Both slopes will be protected by 6-inch layer 
of spalls. Flows from dam will be discharged directly 
into channel of Campus Arroyo. Reservoir capacity is 
190 acre-feet at maximum water surface elevation and 
158 acre-feet at spillway crest. Controlled drainage 
area is 0.45 square miles. Estimated Federal cost is $4, 
970,000. (See Table 17-B for authorizing legislation.) 
Local cooperation. In addition to usual requirements, 
local interests must alter existing improvements, other 
than railroads; prevent encroachment upon outlet 
channel from Las Cruces Dam to Rio Grande in order 
to maintain a channel capacity of 275 cubic feet per 
second; prevent encroachment upon existing channel 
of Campus Arroyo from Campus Dam to point 
opposite present location of university sewage disposal 
plant in order to maintain a channel capacity of at 
least 30 cubic feet per second through this reach; and 
prevent encroachment, other than natural sediment 
deposits, on the reservoir areas which would reduce 
their storage capacities. Estimated non-Federal cost is 
$1,280,000. Formal request for assurances was trans- 
537

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
mitted to city of Las Cruces by letter dated December 
3, 1965, which constituted formal notification of 
commencement of 5-year period of project authorization 
during which time local interests must 
fulfill requirements of local cooperation. City has cash 
resources of $536,000 available from bond issue; 
however, that amount is insufficient to meet total 
estimated costs of local cooperation ($1,280,000). Las 
Cruces Metropolitan Arroyo Flood Control Authority, 
created to take over the requirement of local cooperation 
inasmuch as city had exhausted its bonding 
capability, was dissolved after defeat of bond issue on 
January 30, 1968. On February 20, 1968, Mayor of Las 
Cruces stated that city had resumed work on project 
and was actively pursuing matter of financing local 
cooperation requirements and would explore all 
possible sources of revenue and funding which could be 
developed. City used proceeds available from original 
bond issue ($536,000) to obtain possession and gain 
control of lands for Las Cruces Dam portion of project 
to head off further escalation of land prices. 
Operations and results during fiscal year. Planning 
suspended after notification bond issue failed to pass. 
Condition at end of fiscal year. Work on the project has 
been suspended. 
9. LOS ESTEROS LAKE AND 
MODIFICATION OF ALAMOGORDO 
DAM, PECOS RIVER, N. MEX. 
Location. Los Esteros Lake is in Guadalupe County, 
on Pecos River, at river mile 766.4 approximately 7 
miles north of Santa Rosa, N. Mex. Alamogordo Dam 
(existing) is in DeBaca County on Pecos River, at river 
mile 710.8 about 21 miles upstream from Fort Sumner, 
N. Mex., and about 29 miles southeast of Santa Rosa, 
N. Mex. (See U.S. Geological Survey map, Corazon, 
N. Mex.), sheet, scale 1:125,000.) 
Existing project. Authorized plan of improvement 
provides for construction of an earthfill dam 1,865 feet 
long with maximum height of 218 feet above 
streambed for flood control, irrigation, possible municipal 
water supply, and sediment storage. An 
uncontrolled spillway will be located about 1,000 feet 
back from left abutment and will be an unlined, open 
rock cut. Outlet works, composed of a combination 
pressure tunnel and penstock with two 54-inch 
diameter balanced, free discharge valves will be 
located under left abutment. An earthfill saddle dam 1, 
420 feet long and 12-foot maximum height will be 
located 4,000 feet back from left abutment of main 
dam. Storage capacity of reservoir at spillway crest is 
505,400 acre-feet, of which 60,000 acre-feet is allocated 
to sedimentation reserve, 200,000 acre-feet to irrigation 
and water supply, and 245,400 acre-feet to flood 
control. Area of reservoir at spillway crest is 11,830 
acres. Dam controls 2,479 square miles of drainage 
area. 
Authorized project also includes modification of 
existing Alamogordo Dam and Reservoir on Pecos 
River (river mile 710.8) about 21 miles upstream from 
Fort Sumner, N. Mex., to exclusive flood-control use. 
Under the terms of Pecos River compact and with 
consent of Carlsbad Irrigation District, irrigation 
storage from Alamogordo Reservoir will be transferred 
to Los Esteros Lake. Existing dam is an earth and 
rockfill structure composed of two sections: main dam 
and a dike section which extends from main dam to left 
abutment. Main dam is 148 in height and there is a 3- 
foot parapet wall on crest of dam. Concrete chute 
spillway controlled by three tainter gates is located in 
right abutment. Small hydroelectric plant, with a 
capacity of 7.5 kv-a., supplies local power requirements 
at dam. Reservoir is about 14 miles long, and has a 
capacity of about 128,000 acre-feet, considering most 
recent estimate of displacement by sediment. 
To effect change of Alamogordo Reservoir to 
exclusive flood-control use, embankment will be raised 
10.5 feet and an emergency spillway 500 feet long will 
be cut through sandstone and shale ridge on the right 
abutment. Because maximum water surface would be 
higher under modified condition, crest of service 
spillway will be raised to limit discharge to existing 
capacity of chute. Tainter gates and piers will be 
removed. Also needle valves on outlet works will be 
removed. Modified reservoir will have capacity at 
spillway crest of 168,100 acre-feet. Area of reservoir at 
spillway crest will be 5,960 acres. 
Storage capacity of Alamogordo Reservoir is diminishing 
annually at rate of about 2,200 acre-feet by 
sedimentation and if operated under existing conditions 
will not be capable of supplying the full 
irrigation demand of Carlsbad Irrigation District for 
more than 40 years. With reservoir operated exclusively 
for flood control in combination with Los 
Esteros Dam, appreciable amount of the sediment from 
intervening area will be sluiced through, and therefore 
it is estimated that deposition of sediment will be 
reduced to an average of about 460 acre-feet annually. 
With reduced rates of sediment deposition and with 
proposed modification to the dam and spillway, the 
Alamogordo Reservoir will be effective for flood control 
for 100 years. 
Modifications of Alamogordo Dam already completed 
by United States Bureau of Reclamation consist 
of raising dam to required height, modifying service 
spillway for proper functioning due to increased height 
of dam, and construction of emergency spillway. 
Preliminary studies by Corps indicate some minor 
changes in modified service and emergency spillways 
may still be necessary to adequately comply with 
requirements of authorized project for flood control 
and irrigation. Modifications of dam completed by 
U.S. Bureau of Reclamation have greatly increased 
spillway capacity and will have effect of greatly 
reducing cost of the project to Corps. Full extent of 
reduction in cost, however, will not be known until 
general design studies are completed. 
Federal cost is $13,500,000 for Los Esteros Lake, and 
$1,000,000 for modification of Alamogordo Dam 
538

ALBUQUERQUE, N. MEX., DISTRICT 
including work completed by USBR, a total of $14,500, 
000. (See Table 17-B for authorizing legislation.) 
Local cooperation. In addition to first costs, operation 
and maintenance of both reservoirs will be responsibility 
of Federal Government; however, Carlsbad 
Irrigation District will be required to contribute to 
operation and maintenance costs an annual amount 
equal to what they now pay toward Alamogordo Dam. 
Carlsbad Irrigation District also will be required to 
agree to use of Alamogordo Reservoir for flood-control 
purposes, and because they will realize equivalent 
benefits from storage capacity in Los Esteros Lake, they 
will be required to continue to fulfill their repayment 
obligation. 
Project was authorized subject to the provision that 
"no appropriation shall be made for construction of 
Los Esteros Lake until satisfactory arrangements have 
been made by the State of New Mexico for the transfer 
of irrigation storage from the Alamogordo Reservoir." 
Engineer advisors to Pecos River Compact Commission 
have completed water studies to determine the 
effects of project on water supply in Pecos River basin. 
Corps, U.S. Bureau of Reclamation, Carlsbad Irrigation 
District, and engineer advisors to Texas and 
New Mexico commissioners participated in studies. 
Completed studies have been approved and accepted 
by Pecos River Compact Commission and State 
Engineer of New Mexico. Compact Commission has 
under consideration administration procedures proposed 
by State Engineer of New Mexico for approval 
prior to final negotiations with Carlsbad Irrigation 
District to complete arrangements for the transfer of 
irrigation storage. 
Operations and results during fiscal year. Preconstruction 
planning continued. General design memorandum wa.s 
submitted for approval Jan. 30, 1970. Plans and 
specifications for access road were started. 
Condition at end of fiscalyear. Preconstruction planning 
is about 87 percent complete. 
10. RIO GRANDE BASIN, N. MEX. 
Location. Improvements are on Rio Grande and 
tributaries in New Mexico. More definite locations and 
descriptions of individual projects are in following 
paragraphs and individual reports by projects. 
Existing project. Flood Control Act of 1948 authorized 
flood control phase of comprehensive plan of development 
of water resources of Rio Grande basin in 
New Mexico (H. Doc. 243, 81st Cong., 1st sess.) with 
exception of Chiflo Dam and Reservoir and spillway 
gate structure at Chamita Dam. Although recommended 
Chiflo Dam and Reservoir was deleted 
from authorized plan, it was excluded without prejudice 
to future consideration by Congress. It was 
requested at that time, by States of Colorado and 
Texas, that project be deferred for restudy regarding 
required storage and methods of operation. By same 
act, Congress also authorized for construction irrigation 
phase of comprehensive plan as recommended 
by Bureau of Reclamation (H. Doc. 653, 81st Cong., 2d 
sess.). The act also stipulated that work should be 
prosecuted in accordance with joint agreement approved 
by Secretary of the Army and Acting Secretary 
of the Interior on November 21, 1957. In addition, 
under that agreement Bureau of Reclamation was 
given responsibility for construction, operation, and 
maintenance of channel rectification, and drainage 
rehabilitation and extension phases of unified plan of 
improvement. Authority for Chamita Dam and Reservoir 
was abrogated when Cochiti Dam and Reservoir 
was authorized. (See Table 17-B for authorizing 
legislation and Table 17-D for existing projects.) 
All operations and costs for projects in authorized 
plan are in individual reports on the following pages. 
10A. ABIQUIU DAM, RIO CHAMA, N. MEX. 
Location. Project is one unit of flood control phase of 
comprehensive plan for Rio Grande and tributaries, 
New Mexico. Abiquiu Dam is on Rio Chama near 
town of Abiquiu, N. Mex., about 30 miles upstream 
from confluence of Rio Chama and Rio Grande. (See 
Geological Survey Map for plan and profile of Rio 
Chama, N. Mex., from mouth to mile 103, sheet 1, and 
Army Map Service, Aztec, N. Mex.; Colorado NJ 13- 
10, scale 1:250,000.) 
Existing project. An earthfill dam 1,540 feet long, 
rising 325 feet about streambed, with a 12-foot 
diameter controlled outlet, and an uncontrolled 
spillway in a natural saddle about 1 mile north of left 
abutment. Reservoir provides 571,000 acre-feet of flood 
control and sediment storage. Total capacity at 
spillway crest is 1,217,300 acre-feet. (See table 17-B for 
authorizing legislation.) 
Operations and results during fiscal year. Ordinary 
maintenance and operation continued. Storage and 
flows were regulated in accordance with regulations 
prescribed by Rio Grande Compact Commission. On 
July 1, 1969, pool elevation was 6,103.96 with 
corresponding storage of 2,662 acre-feet. Storage varied 
from about 1,900 acre-feet to 4,400 acre-feet during the 
period from July 1, to December 31, 1969. Releases of 
El Vado Dam storage were passed through Abiquiu 
Reservoir from November 19 to December 19, 1969. 
Maximum pool elevation of 6,166.98 with corresponding 
storage of 48,700 acre-feet occurred on 
May 25, 1970. The permanent pool of approximately 
2,000 acre-feet was maintained and inflow was released 
from January 1 to May 10 except for the period from 
February 13 to March 3 when the pool was drawn 
down to permit conduit and gate inspection. On May 
10, 1970, the New Mexico State Engineer requested 
releases be reduced to 500 c.f.s. due to levee erosion 
near Chili. Large snowmelt flows began on Rio Ojo 
Caliente below Abiquiu Dam during the last week in 
April which deposited considerable sediment in the Rio 
Chama Channel near Chili, and the channel levee was 
breached. On May 13 releases from the reservoir were 
increased to 800 c.f.s. and as the channel continued to 
degrade releases were further increased. Maximum 
release of 2,350 c.f.s. occurred on June 12, 1970. By 
539

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
June 15, 1970, storage was drawn down to permanent 
pool level of about 2,000 acre-feet. Pool elevation was 6, 
104.75 with corresponding storage of 2,020 acre-feet on 
June 30, 1970. 
Accumulated flood and sediment damages prevented 
by the project since completion were $643,750, 
through fiscal year 1969. 
Condition at end of fiscal year. Project was placed in 
operation in February 1963. 
10B. COCHITI LAKE, N. MEX. 
Location. Dam is at river mile 340 on Rio Grande 
(river mile 0 being at intersection of New Mexico- 
Texas State line with international boundary at El 
Paso, Tex.), near village of Cochiti, which is about 50 
miles upstream from Albuquerque, N. Mex. (See 
Geological Survey Maps, Cochiti Dam, N. Mex., 
Quadrangle and Santo Domingo Pueblo, N. Mex., 
quadrangle, scale 1:24,000.) 
Existing project. Consists of an earthfill dam about 5.1 
miles long with a maximum height of 251 feet above 
streambed. Project will extend generally in an eastwest 
line across Rio Grande to a point about 2 miles 
east of Rio Grande and then southward across Santa Fe 
River. An uncontrolled spillway with a 460-foot-long 
ogee-weir and a 160-foot notch 10 feet deep in center 
will be at end of embankment on south side of Santa Fe 
River. Operational releases for flood control and 
irrigation will be made through a 3-barrel gated 
conduit in left abutment on Rio Grande. No outlet will 
be provided on Santa Fe River. Dead storage in Santa 
Fe River and Canada de Cochiti arms of reservoir will 
be eliminated by means of conveyance channels. 
Construction will also involve relocation of a gravelsurfaced 
Forest Service road and an irrigation headworks 
and canal. Reservoir will have a storage capacity 
of 442,000 acre-feet for flood control, 110,000 acre-feet 
for sediment, and 50,000 acre-feet for recreation a total 
of 602,000 acre-feet. Storage capacity for permanent 
pool for recreation will be provided by slightly 
modifying the operating procedures. Modification of 
project structures, except for specific recreation facilities, 
will not be necessary because of permanent 
pool. Estimated Federal cost is $85,500,000. (See table 
17-B for authorizing legislation.) 
Operations and results during fiscal year. Construction of 
embankment and conveyance channels, portions of the 
outlet and spillway, phase 2 of road relocation, utilities 
and structures, some reservoir clearing, service road, 
overlook facilities and parking area was initiated June 
19, 1970, under one contract. Construction of outlet 
works portion and relocation of portions of irrigation 
structures and utilities and New Mexico Highway 22 
was continued. 
Conditions at end offiscalyear. Project planning is about 
95 percent complete. Construction of the major portion 
of the spillway is complete. Construction of the outlet 
works (portion) and relocation of portions of irrigation 
structures and utilities and New Mexico Highway 22 is 
about 97 percent complete. Entire project is about 22 
percent complete. 
10C. GALISTEO DAM, N. MEX. 
Location. Dam is at river mile 12 on Galisteo Creek, a 
tributary of Rio Grande. Definite project site is about 8 
miles upstream of project document site. Reservoir will 
extend upstream from dam for about 4 miles to near 
village of Waldo, N. Mex. (See Geological Survey 
Map, San Pedro 1, N. Mex. quadrangle scale 1:24, 
000.) 
Existing project. Consists of an earthfill dam 2,820 feet 
long with a maximum height of 158 feet above 
streambed. There will be a 10-foot diameter uncontrolled 
outlet with discharge capacity of 4,980 cubic 
feet per second for pool at spillway crest elevation, and 
a spillway with a broad crested weir 250 feet long in 
right abutment. At spillway crest elevation reservoir 
will have a storage capacity of 89,800 acre-feet for flood 
control, in which provision is made for storage of 10,200 
acre-feet of sediment based on an estimated 50-year 
sediment depletion. Santa Fe River which enters Rio 
Grande about 5 miles upstream from mouth of Galisteo 
Creek will be diverted into Cochiti Reservoir instead of 
Galisteo Reservoir as provided in project document 
plan (S. Doc. 94, 86th Cong., 2d sess.). Estimated 
Federal cost is $13,800,000. (See table 17-B for 
authorizing legislation.) 
Operations and results during fiscal year. Construction of 
the outlet works, embankment, spillway and other 
facilities was continued. 
Condition at end of fiscal year. Project planning, 
construction of access road, relocation of county road 
and A.T. & S.F. Railroad are complete. Construction 
of outlet works, embankment, spillway and other 
facilities is essentially complete. Entire project is about 
98 percent complete. 
10D. JEMEZ CANYON DAM, N. MEX. 
Location. In Sandoval County, N. Mex., on Jemez 
River about 2 miles upstream from confluence of 
Jemez River and Rio Grande, about 5 miles northwest 
of Bernalillo, N. Mex. (See Geological Survey Map for 
Bernalillo quadrangle, scale 1:125,000.) 
Existing project. An earthfill dam 780 feet long with a 
maximum height of 136 feet above streambed, and offchannel 
uncontrolled saddle spillway 400 feet wide, 
and a 13-foot diameter gated outlet in left abutment 
with discharge capacity of 8,100 cubic feet per second 
with pool at spillway crest elevation. Reservoir has a 
capacity of 117,213 acre-feet (73,000 acre-feet for flood 
control and 44,213 acre-feet for sediment control, in 
which 4,914 acre-feet of sediment have been deposited.) 
It is estimated that 70,000 acre-feet of storage 
will be available in the reservoir for flood control after 
50 years of project life. Federal cost was $4,177,417. 
(See table 17-B for authorizing legislation.) 
540

ALBUQUERQUE, N. MEX., DISTRICT 
Operations and results during fiscal year. Ordinary 
maintenance and operation continued. Reservoir was 
empty on July 1, 1969, and remained empty most of the 
year except for short periods of sediment control 
storage during August, September, and October, 1969. 
Sediment control regulation for spring runoff began on 
April 8, 1970, and continued until May 31, 1970. 
There was no flood control regulation for the fiscal 
year. The maximum pool elevation was 5,160.55 on 
October 23, 1969, with a corresponding storage of 3, 
198 acre-feet. Estimated total accumulated flood and 
sediment damages prevented by project through fiscal 
year 1970 were $1,660,620. 
Condition at end of fiscal year. Construction of project 
was initiated May 1950 and completed May 1954. 
10E. RIO GRANDE FLOODWAY, N. MEX. 
Location. Project is one unit of flood control phase of 
comprehensive plan of improvement for Rio Grande 
Basin in New Mexico. It is on Rio Grande and covers 
section of river commencing near Truth or Consequences 
(formerly Hot Springs) at about river mile 
123 and extends upstream to lower end of Rio Grande 
Canyon about 14 miles upstream from Espanola, N. 
Mex., about river mile 394. (See table 17-D on Rio 
Grande Floodway.) 
Existing project. Consists of flood protection and major 
drainage improvements by channel rectification, levee 
enlargement and construction, and bank stabilization 
work where needed to protect levees. Construction of 
project is a joint undertaking by Bureau of Reclamation 
and the Corps. Portions to be done by Corps 
will consist of levee enlargement, construction, and 
bank protection work, with channel-rectification and 
drainage-rehabilitation work the responsibility of 
Bureau of Reclamation. Levees constructed by local 
interests exist through reach of river involved, but are 
not uniform as to grade, section, or standard of 
construction, and in many places are threatened by 
meandering river. (See table 17-E on existing project 
and table 17-B for authorizing legislation.) 
Local cooperation. In addition to usual requirements, 
local interests are responsible for all highway, bridge, 
and public utility relocations or replacements required 
in construction of project. Fully complied with for 
completed units of floodway. Total costs for all 
requirements for completed Albuquerque unit under 
terms of project authorization were $75,000. There 
were no non-Federal costs in connection with construction 
of Cochiti to Rio Puerco unit of floodway. 
Espanola Valley unit was inactive for several years; 
however, in December 1963, local interests reaffirmed 
need for flood protection for city of Espanola, and 
indicated in writing that they were willing and able to 
provide necessary rights-of-way for levees and make 
utility relocations required in construction of project. 
Project was reclassified to active category, and funds 
were appropriated for initiation of preconstruction 
451-584 0-72-35 
planning in fiscal year 1966. Progress on this project 
has been slow because the local sponsor was extremely 
dilatory in meeting the request for rights-of-entry in 
order to perform surveys. Right-of-entry was finally 
obtained on May 15, 1967, from the Indian Pueblo of 
Santa Clara which is the principal landowner affected 
by the project. 
Operations and results during fiscal year. Preconstruction 
planning for the Espanola Valley unit of the floodway 
was continued. 
Estimated total accumulated flood damages prevented 
by the floodway project through fiscal year 1969 
amounted to $747,280. 
Condition at end of fiscal year. Construction of Albuquerque 
and Cochiti to Rio Puerco units of Rio 
Grande Floodway project is complete. San Acacia to 
Bosque del Apache and Truth or Consequences (Hot 
Springs) units of floodway are deferred for restudy. 
Hydrology and general design memoranda for 
Espanola Valley unit have been approved. Preconstruction 
planning is about 90 percent complete. 
11. TRINIDAD LAKE, PURGATOIRE 
RIVER, COLO. 
Location. On Purgatoire River about 161 miles above 
its junction with Arkansas River. Project is about 4 
miles upstream from city of Trinidad, Colo. (See 
Geological Survey Map, Trinidad, Colo., quadrangle, 
scale 1:24,000.) 
Existing project. Consists of an earthfill structure 6,610 
feet long, with a maximum height of 200 feet above 
streambed, an uncontrolled spillway 1,000 feet wide in 
left abutment, and a 10-foot diameter, gate-controlled 
conduit in right abutment with discharge capacity of 4, 
850 cubic feet per second with water surface at top of 
flood control pool. Reservoir provides for storage of 51, 
000 acre-feet for flood control, 39,000 acre-feet for 
sediment, 20,000 acre-feet irrigation, and 4,500 acrefeet 
for recreation, a total of 114,500 acre-feet. 
Reservoir controls a drainage area of 606 square miles 
and will be operated for flood and sediment control, 
irrigation, and recreation purposes. Estimated Federal 
cost is $27,400,000 (CE) & $160,000 (USBR). (See 
table 17-B for authorizing legislation.) 
Local cooperation. Requirements based on approved 
general design memorandum studies: Repayment by 
Purgatoire River Water Conservancy District of first 
cost allocated to irrigation established as 29.28 percent 
of total project cost presently estimated at $8,023,000 
(1970 prices) generally in accordance with Federal 
reclamation law procedures, except that repayment of 
irrigation first cost may extend over a period not to 
exceed 75 years including a 5-year development period 
which results in an actual amortization period of 70 
years; contribution of $21,400 annually by State of 
Colorado for replacement of evaporation and seepage 
losses from permanent fishery pool; Purgatoire River 
Water Conservancy District (representing the ir- 
41

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
rigators) is required to bear 19.82 percent of annual 
joint-use operation and maintenance costs and 2.52 
percent of major replacement costs presently estimated 
at $13,600 annually; in addition, estimated annual cost 
to city of Trinidad for maintenance of channel of 
Purgatoire River through city is $1,100. In addition 
conservancy district must make arrangements for 
transfer of Model Land and Irrigation Co.'s storage 
rights from existing Model Reservoir to Trinidad 
Reservoir. Storage for recreation purposes not included 
in authorized project plan; however, project document 
noted that substantial benefits would be derived from 
such use and that there was strong local support for 
such storage. Provision was made in project plan for 4, 
500 acre-feet of permanent storage for recreation; 
however, since flows of Purgatoire River are fully 
appropriated, water rights will have to be acquired by 
non-Federal interests. Estimated cost of initial filling of 
pool is $250,000 and replacement of evaporation losses 
will cost an estimated $21,400 per year. Lands and 
facilities for recreation will be provided at Federal 
expense, but cost of water rights will be borne by the 
State of Colorado. 
Assurances of local cooperation received from City of 
Trinidad and Purgatoire River Water Conservancy 
District were formally accepted May 11, 1967, after 
execution of irrigation repayment contract. Stipulated 
decree changing place of storage of water rights 
decreed to existing Model Reservoir from that reservoir 
to proposed Trinidad Reservoir was conditionally 
approved by Las Animas County, Colorado, District 
Court April 15, 1965, subject to ultimate execution and 
approval of irrigation repayment contract, which 
qualifying condition is now removed. Purgatoire River 
Water Conservancy District, representing water users, 
signed prime irrigation repayment contract January 
21, 1967. Prime contract was then signed by Regional 
Director, Region 7, Bureau of Reclamation February 
10, 1967, under delegated authority of U.S. Department 
of Interior. Contract is dated February 10, 
1967. Irrigation repayment contract was confirmed by 
decree of Las Animas County, Colorado, District Court 
entered into March 21, 1967, and 30-day period of 
appeal required by Colorado statutes expired with no 
appeals being filed. 
Operations and results during fiscal year. Acquisition of 
real estate was continued. Construction of outlet works 
was continued. Revised assembly for cemetary relocation 
plan was approved. Preparation of plans and 
specifications on relocation of county road was continued. 
Condition at end of fiscalyear. Construction of outlet 
works is about 95 percent complete. Acquisition of land 
for project is about 81 percent complete. Entire project 
is about 23 percent complete. 
12. TWO RIVERS DAM, N. MEX. 
Location. About 14 miles southwest of Roswell, N. 
Mex., on Rio Hondo. Rio Hondo is formed at 
confluence of Rio Ruidoso and Rio Bonito, near village 
of Hondo, N. Mex., in foothills region of Sierra Blanca 
in southeastern part of Lincoln County, N. Mex., and 
flows generally easterly to its confluence with Pecos 
River near Roswell, N. Mex. (See Geological Survey 
Map, Hondo Reservoir quadrangle, scale 1:24,000.) 
Existing project. Two earthfill dams, Diamond "A" 
Dam on Rio Hondo at about river mile 36 and Rocky 
Dam on Rocky Arroyo at about river mile 14, which 
will form Two Rivers Reservoir. Diamond "A" Dam is 
98 feet high and 4,918 feet long and Rocky Dam is 118 
feet high and 2,920 feet long. Topography of site 
permits use of two natural saddles in limestone on rim 
of reservoir for spillways which have a total length of 1, 
130 feet. One of the spillway saddles is between the 
dams and one is south of Rocky Dam. There is a gated 
outlet works structure in Diamond "A" Dam and an 
uncontrolled outlet in Rocky Dam. No provision is 
made for storage except for flood control. Flood releases 
will be controlled insofar as possible, so that flows 
through Roswell will not exceed channel capacity of 
Rio Hondo, which is 1,000 cubic feet per second. 
Capacity of Two Rivers Reservoir at spillway crest is 
168,000 acre-feet, of which 18,000 acre-feet are 
provided for sedimentation reserve, but which will be 
utilized for flood control until filled with sediment. 
Dam controls 963 square miles of drainage area on Rio 
Hondo and 64 square miles on Rocky Arroyo, a total of 
1,027 square miles. Federal cost was $4,790,838. (See 
table 17-B for authorizing legislation.) 
Local cooperation. Complied with. Total cost to local 
interests was $144,000, of which $60,000 was for 
construction of access road and $84,000 for lands and 
rights-of-way. 
Operations and results during fiscal year. Ordinary 
maintenance and operation continued. Reservoir was 
empty July 1, 1969. No flood control regulation during 
the fiscal year. The peak mean daily inflow was 696 
c.f.s. on September 21, 1969. Diamond "A" Dam had a 
maximum pool elevation of 3,982.70 feet with a 
corresponding storage of 849 acre-feet on September 
21, 1969. Rocky Dam had a maximum pool elevation 
of 3,947.57 feet with a corresponding storage of 100 
acre-feet on September 22, 1969. September was the 
only month during the fiscal year in which there was 
storage in Two Rivers Dam. Estimated total accumulated 
flood damages prevented through fiscal 
year 1969 were $1,074,910. 
Condition at end of fiscal year. Project is complete and 
was placed in operation July 1963. 
542

ALBUQUERQUE, N. MEX., DISTRICT 
13. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Included under this heading is inspection of completed 
flood control projects transferred to local interest 
for operation and maintenance. Projects in Colorado 
and New Mexico were inspected. Fiscal year cost was 
$5,063 and total cost to June 30, 1970, was $40,930. 
14. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Pursuant to section 7, Flood Control Act of 1944, 
expenditures were made for scheduling flood control 
reservoir operations and preparation of reservoir 
regulation manual for Platoro Dam on Conejos River 
near town of Platoro, Conejos County, Colo. Platoro 
Dam was authorized by Interior Appropriation Act of 
1941 (see H. Doc. 693, 76th Cong., 3d sess.). Construction 
of project was completed by Bureau of 
Reclamation in fiscal year 1952. 
Reservoir elevation at start of fiscal year was 9,951.5 
feet with corresponding storage of 5,600 acre-feet. 
There was no change in storage until November 1, 
1969, when storage transfer to Elephant Butte Reservoir 
began. On November 7, 1969, the pool elevation 
was 9,942.3 with a corresponding storage of 3,000 acrefeet, 
and operation of Platoro Dam was closed for the 
winter. Operation began again on April 28, 1970. The 
pool elevation on that date was 9,946.0 with a 
corresponding storage of 4,000 acre-feet. Storage was 
static and inflow was passed for the remainder of the 
fiscal year. The maximum regulated release for the 
fiscal year was 558 c.f.s. and occurred on May 23, 1970. 
There was no flood control regulation during the fiscal 
year. Estimated total accumulated flood damages 
prevented by project through fiscal year 1969 were 
$629,000. Fiscal year costs were $1,803, and total costs 
to June 30, 1970, were $42,492. 
15. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 17-C. 
16. PREAUTHORIZATION STUDIES IN 
INTEREST OF POTENTIAL PROJECTS 
Flood control activities pursuant to section 205, Public Law 
685, 84th Congress, as amended (preauthorization). 
Federal costs for the fiscal year on engineering and 
design for Arkansas River, Cotopaxi, Colorado was 
$234. 
17. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATIONS 
Emergency flood control activities-repair,f lood fighting, and 
rescue work. (Public Law 99, 84th Cong., and antecedent 
legislation) 
Federal costs for fiscal year were $16,464 for advance 
preparation, and $9,547 for flood emergency operations, 
and $67,961 for repair and restoration. 
Emergency bank protection (sec. 14, 1946 Flood Control Act, 
Public Law 526, 79th Cong.) 
Federal costs for fiscal year were $653 for continuing 
emergency bank protection work and investigations 
work on Rio San Jose and Grants Canyon at Grants, 
New Mexico, and $13,452 on the Rio Chama at Chili, 
New Mexico. 
Snagging and clearing of navigable streams and tributaries in 
the interests of flood control. (Sec. 208 of the 1954 Flood Control 
Act, PL 780, 83d Cong., Sept. 3, 1954.) 
Federal costs for fiscal year were $77,698 for 
continuing snagging and clearing work on the Rio 
Chama at Chili, New Mexico. 
GENERAL INVESTIGATIONS 
18. SURVEYS 
Fiscal year costs were $214,699, of which $199,949 
was for flood control studies and $14,750 for special 
studies (coordination studies with other agencies). 
19. COLLECTION AND STUDY OF BASIC 
DATA 
Fiscal year costs were $74,043 for flood plain 
management services and $77,217 for continuation of 
flood plain information studies on the St. Charles River 
of Pueblo, Colorado, Arkansas River at Dodge City, 
Kansas, Albuquerque Arroyos, Part 1, and initiation of 
studies on Arkansas and Pawnee Rivers at Larned, 
Kansas. Additionally, a special flood hazard information 
report was prepared for the Arkansas River 
at Wilroads Gardens - Ft. Dodge, Kansas. 
20. RESEARCH AND DEVELOPMENT 
Hydrologic studies involving collection and study of 
basic data, such as streamflow data, collection of 
suspended sediment samples, recording rain gage data, 
hydrometeorological studies, and sedimentation studies 
continued. Fiscal year costs were $6,800. 
543

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 17-A 
See 
Section 
in Text Project 
Albuquerque 
Diversion Channels 
Project, New 
Mexico (Federal 
Funds) 
(Contributed 
Funds) 
(Other Contributed 
Funds) 
2. Conchas Lake, 
Canadian River, 
New Mexico 
3. Dodge City Local 
Protection Project, 
Kansas 
4. El Paso Local 
Protection Project, 
Texas 
5. Great Bend Local 
Protection Project, 
Kansas 
6. John Martin 
Reservoir, Arkansas 
River, Colo. 
7. Las Animas Local 
Protection Project, 
Colo. 
8. Las Cruces Local 
Protection Project, 
New Mexico 
9. Los Esteros Lake 
and Modification 
of Alamogordo Dam, 
Pecos River, New 
Mexico 
10. Rio Grande Basin, 
New Mexico 
10A. Abiquiu Dam, 
Rio Chama, New 
Mexico 
10B. Cochiti Lake, 
New Mexico 
IOC. Galisteo Dam, 
New Mexico 
COST AND FINANCIAL STATEMENT 
Total to 
FY 67 FY 68 FY 69 FY 70 June 30, 1970 
$ 3,673,906 $4,275,000 $ 2,000,000 $ 2,022,000 $15,528,192 
3,079,046 5,286,430 1,556,282 493,155 13,270,417 
Funding 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
95,000 
70,075 
9,592 
154,800 
154,043 
75,000 
50,856 
150,000 
74,436 
-600 
179,171 
179,135 
75,000 
41,879 
35,300 
8,443 
22,071 
537,863 
116,778 
116,403 
2,830,000 
2,817,297 
2,400,000 
1,580,136 
- 
121,017 
16,281 
178,976 
178,111 
39,823 
262,500 
335,204 
67,500 
6,530 
-8,533 
188,852 
155,868 
145,000 
153,695 
10,000 
30,836 
95,000 
68,762 
-25,012 
7,140 
136,517 
137,727 
3,600,000 
2,549,269 
2,160,000 
3,020,616 
29,562 
50,000 
24,955 
203,948 
215,672 
4,714 
74,000 
94,223 
2,659 
227,078 
223,902 
1,160 
2,073 
143,000 
129,668 
325,000 
306,297 
522,000 
496,955 
13,309,1761 
13,309,1761 
3,209,835 
3,197,291 
375,142 
322,731 
826,500 
819,553 
12,500 
12,137 
15,173,389 
15,173,389 
3,408,919 
3,405,595 
220,000 
212,899 
267,000 
264,570 
842,862 
820,127 
50,000 
36,297 
22,000 
22,000 
202,483 
181,517 
55,000 
3,140 
340,000 
315,690 
-55,000 
2,948 
195,244 
229,034 
16,164 
2,431 
290,000 
306,835 
2,626 
128,896 
131,531 
3,200,000 
3,287,566 
2,701,000 
2,525,682 
141,645 
140,626 
1,500,000 
1,380,557 
2,497,000 
2,531,868 
15,893 
14,893 
908,296 
905,750 
15,095,354 
13,728,047 
14,212,510 
14,049,178 
15,893 
14,893 
544 
- 21,272,299 
250 21,261,883

TABLE 17-A (Continued) 
ALBUQUERQUE, N. MEX., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
10D. Jemez Canyon New Work 
Dam, New Approp. $ - $ - $ - $ - $ 4,177,417 
Mexico Cost - - - 4,177,417 
Maint. 
Approp. 37,352 48,000 54,987 57,052 692,642 
Cost 39,461 47,309 55,486 54,183 689,566 
10E. Rio Grande New Work 
Floodway, Approp. -3,9063 50,000 - - 4,898,1034 
New Mexico Cost 29,550 40,101 9,919 4,030 4,895,6525 
11. Trinidad Lake New Work 
Purgatoire River, Approp. 900,0006 1,140,000 1,664,000 2,010,000 6,563,458 
Colo. Cost 157,516 1,549,820 1,981,037 1,890,701 6,424,952 
12. Two Rivers Dam New Work 
Rio Hondo, New Approp. - - - - 4,790,838 
Mexico Cost - - - 4,790,838 
Maint. 
Approp. 49,699 32,854 61,291 42,719 295,763 
Cost 48,622 41,985 61,138 40,587 293,478 
1. Includes $3,492,696 maintenance and improvement costs 
and $869,978 for emergency relief, excludes $2,279,326, cost of 
initiating project under the authority of Emergency Relief 
Appropriation Act of 1935 and $222,669, the cost for work 
performed with funds transferred to the Corps under Public 
Works Acceleration Act of 1962. 
2. Excludes $59,977 emergency relief funds for new work. 
3. $50,000 appropriated by Congress for Espanola Valley 
unit of floodway, but not apportioned to District because of 
uncertain status of local cooperation. 
4. Includes funds appropriated for completed Albuquerque 
and Cochiti to Rio Puerco units and for preconstruction 
planning of Espanola Valley unit. Excludes $1,000,041 transferred 
to Bureau of Reclamation under memorandum agreement 
between that agency and the Corps. Does not include funds 
referenced in footnote 3. 
5. Includes costs for completed Albuquerque and Cochiti to 
Rio Puerco units and for preconstruction planning of Espanola 
Valley unit. Excludes costs incurred by Bureau of Reclamation 
from funds transferred to that agency under the memorandum 
agreement covering construction of Cochiti to Rio Puerco unit. 
6. Includes $700,000 restored to District late in fiscal year 
from budgetary reserve. 
545

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Work Authorized Documents 
ALBUQUERQUE DIVERSION CHANNELS, N. MEX. (See Section 1 of Text) 
North Diversion Channel 10 miles long and South Diversion H. Doc. 464, 83rd Cong., 2d sess.1 
Channel 6 miles long on high ground east of and parallel to 
Rio Grande Valley. Designed to intercept and carry flows 
equal to magnitude of standard project flood for all tributaries 
of Rio Grande from east. 
Emergency Relief 
Appropriation Act 
of 1935 and adopted 
by Congress in 1936 
Flood Control Act. 
May 1, 1940 
Oct. 23, 1962 
Oct. 27, 1965 
Oct. 27, 1965 
CONCHAS LAKE, N. MEX. (See Section 2 of Text) 
Concrete gravity section dam 1,250 feet long with earth dikes 
on each side 3.7 miles long for flood control, irrigation and 
water supply purposes. 
Easement deed to State of New Mexico for the use and 
occupation of lands and water areas for public recreation 
purposes. 
H. Doc. 308, 69th and 74th Cong. 
1st sess. and Report of Canadian 
River, N. Mex., Tex., and Okla., 
dated June 1, 1931. 
Public Law 504, 76th Cong., 
3rd sess. 
DODGE CITY LOCAL PROTECTION PROJECT, KANS. (See Section 3 of Text) 
7 miles of levees and enlargement of river channel to 470 H. Doc. 498, 8 7th Cong., 2d sess. 1 
foot wide floodway through city. Based on design flow of 
40,000 c.f.s. with added requirement for top of levees to 
not be lower than profile of 60,000 c.f.s. flow. 
EL PASO LOCAL PROTECTION PROJECT, TEX. (See Section 4 of Text) 
A single-purpose flood control system of detention dams, H. Doc. 207, 89th Cong., 1st sess. 1 
diversion dikes and channels to collect, regulate and 
discharge arroyo runoff into the Rio Grande. Consists of 
four independent units (NW Area, Central Area, and two 
units, Copper System and Bluff Channel of the SE Area). 
GREAT BEND LOCAL PROTECTION PROJECT, KANS. (See Section 5 of Text) 
7.7 miles of leveed channel to divert Walnut and Litle Walnut H. Doc. 182, 89th Cong., 1st sess.1 
Creeks around the city; 6 miles of improved channel with 
levees along the Arkansas River and a 4.3 mile long tieback 
levee on left bank of Arkansas River along with other 
improvements and alterations. 
June 22, 1936 
War Dept. Civil 
Appropriation Act 
of June 24, 1940. 
Oct. 27, 1965 
JOHN MARTIN RESERVOIR PROJECT, COLO. (See Section 6 of Text) 
A concrete and earthfill structure about 2.6 miles long with 
a maximum height of 130 feet for flood control, irrigation, 
and water conservation for Colorado and Kansas. Structure 
has a controlled outlet and a gated spillway. 
Name of project changed from Caddoa Reservoir to John Martin 
Reservoir Project. 
Authorized use of 10,000 acre-feet of reservoir flood 
control storage for permanent pool for fish and wildlife 
and recreation subject to certain conditions. 
H. Doc. 308, 74th Cong., 1st sess. 
W.D. Civil Appropriation Act 
of 1940. 
Public Law 89-298, 89th Cong., 
Sec. 201. 
LAS ANIMAS LOCAL PROTECTION PROJECT, COLO. (See Section 7 of Text) 
About 10.6 miles of levees on both banks of Arkansas River H. Doc. 165, 89th Cong., 1st sess.1 
including interior drainage system to protect the city from 
flood flows up to 140,000 c.f.s. 
LAS CRUCES LOCAL PROTECTION PROJECT, N. MEX. (See Section 8 of Text) 
Two earthfill dams, one 15,570 ft. long and the other 1,790 ft. S. Doc. 117, 87th Cong., 2d sess. 1 
long, with uncontrolled outlets and spillways located east of 
city to intercept flood flows from Alameda, Las Cruces and 
Campus Arroyos. Discharges from dams to be conveyed through 
city to Rio Grande by an unlined trapezoidal channel. 
546 
TABLE 17-B 
Acts 
Sept. 3, 1954 
Oct. 22, 1965 
Oct. 23, 1962

ALBUQUERQUE, N. MEX., DISTRICT 
TABLE 17-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
LOS ESTEROS LAKE AND MODIFICATION OF ALAMOGORDO DAM, N. MEX. (See Section 9 of Text) 
Sept. 3, 1954 
June 30, 1948 
May 17, 1950 
July 14, 1960 
June 30, 1948 and 
May 17, 1950 
July 14, 1960 
March 26, 1964 
July 14, 1960 
June 30, 1948 and 
May 17, 1950 
June 30, 1948 and 
May 17, 1950 
An earthfill dam with maximum height of 218 ft. and 1,865 ft. 
long for the purpose of flood control, irrigation and 
sedimentation storage located on Pecos River 7 miles north 
of Santa Rosa, N. Mex. Includes modification of existing 
Alamogordo Dam (USBR project) 29 miles southeast of Santa 
Rosa, N. Mex. on Pecos River. 
RIO GRANDE BASIN, N. MEX. (See Section 10 of Text) 
Authorized to be appropriated $3,500,000 to be expended by 
the Dept. of the Army for partial accomplishment of approved 
general comprehensive plan for the Rio Grande Basin in 
N. Mex. and Colo. 
Authorized to be appropriated an additional $39,000,000 
for Dept. of the Army for prosecution of comprehensive 
plan for the Rio Grande Basin. 
Authorized Cochiti Dam on Rio Grande and Galisteo Dam on 
Galisteo Creek as additions to authorized comprehensive 
plan for Rio Grande Basin (Cochiti Dam was authorized 
in lieu of Low Chamita Dam of Chamita Reservoir Project 
on Rio Chama under "substitute plan"). Also authorized 
to be appropriated an additional $58,300,000 for Dept. of 
the Army for this addition to comprehensive plan for the 
Rio Grande Basin. 
ABIQUIU DAM, N. MEX. (See Section 10A of Text) 
Earthfill dam 1,540 ft. long, 325 ft. maximum height with 
with controlled outlet and uncontrolled spillway for flood 
control and sediment storage. 
COCHITI LAKE, N. MEX. (See Section 10B of Text) 
Earthfill dam 5.1 miles in length and maximum of 251 ft. in 
Height with controlled outlet and uncontrolled spillway, 
located on Rio Grande and across Santa Fe River. For 
flood control, sediment storage and irrigation release 
purposes. Authority for Low Chamita Dam on Rio Chama was 
abrogated when Cochiti Dam was authorized. 
Project was modified to provide for conservation and 
development of fish and wildlife resources and recreation, 
about 50,000 acre-feet of water for initial filling of a 
permanent pool of 1,200 surface acres in the reservoir, and 
thereafter sufficient water annually to offset evaporation 
from such area. 
GALISTEO DAM, N. MEX. (See Section 10C of Text) 
Earthfill dam 2,820 feet long and maximum of 158 feet in 
height with uncontrolled outlet and spillway for flood 
control and sediment storage on Galisteo Creek, tributary 
of Rio Grande. 
JEMEZ CANYON DAM, N. MEX. (See Section 10ODo f Text) 
Earthfill dam 780 feet long and maximum of 136 feet in height 
with controlled outlet and uncontrolled spillway for flood 
control and sediment storage on Jemez River, tributary of 
Rio Grande. 
RIO GRANDE FLOODWAY, N. MEX. (See Section 10E of Text) 
Channel rectification, levee enlargement and construction, 
and bank stabilization on Rio Grande between river mile 
123 and 394 (See Table 17E.) 
H. Doc. 339, 84th Cong., 2d sess. 1 
Sec. 203, Public Law 780, 83d 
Cong., 2d sess. 
H. Doc. 243, 81st Cong., 1st sess. 
Public Law 516, 81st Cong., 
2d sess. 
S. Doc. 94, 86th Cong., 2d sess. 
H. Doc. 243 31st Cong., 1st sess. 1 
Public Law 516, 81st Cong., 2d 
sess. 
Substitute Plan - S. Doc. 94, 86th 
Cong., 2d sess.1 
Public Law 88-293, 88th Cong. 
S. Doc. 94 86th Cong., 2d sess.' 
H. Doc. 243, 81st Cong., 1st sess. 
and Public Law 516, 81st Cong., 
2d sess. 
H. Doc. 243, 81st Cong., 1st sess.1 
and Public Law 516, 81st Cong., 
2d sess. 
547

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 17-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
TRINIDAD LAKE, COLO. (See Section 11 of Text) 
July 3, 1958 and Earthfill dam 6,610 feet long and maximum of 200 feet in height H. Doc. 325, 84th Cong., 2d sess.1 
Dec. 11, 1944 with controlled outlet and uncontrolled spillway for flood and H. Doc. 387, 78th Cong., 
control, sediment storage, irrigation and recreation purposes 2d sess. 
on Purgatoire River. Authorization of Trinidad Dam provides 
for abrogation of channel improvement project through city of 
Trinidad, Colo. at time construction of dam is initiated. 
Oct. 27, 1965 Relieved city of Trinidad of responsibility for cash Public Law 89-298, 89th Cong., 
contribution toward cost of constructing Trinidad Dam. Sec. 201. 
TWO RIVERS DAM, N. MEX. (See Section 12 of Text) 
Sept. 3, 1954 Two earthfill dams (one on Rio Hondo and one on Rocky Arroyo) H. Doc. 436, 83rd Cong., 2d sess. 1 
about 14 miles southwest of Roswell, N. Mex. One 98 feet 
high and 4,918 feet long the other 118 feet high and 2,920 
feet long, one dam with controlled outlet, both dams have 
uncontrolled spillways. All storage is for flood control. 
1. Contains latest published maps. 
TABLE 17-C OTHER AUTHORIZED FLOOD CONTROL PROJECTS
Cost to June 30, 1970 
For Last 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Alamogordo diversion channel, Tularosa (closed) 
Basin, New Mexico1 1966 $ 176,287 $ - 
Colorado Springs, Fountain que Bouille River, 
Colo. (Templeton Gap Floodway)2 1959 881,262 
Creede, Willow Creek, Colo. (floodway)2 1951 219,7893 
Pecos, Texas, flood control project 1 ,4 1960 93,370 - 
Pinon Canyon Dam, Trinidad, Coln. (Sec. 212)2 - 130,678 3 
Pueblo, Arkansas River, Colo. (floodway 
levee extension)2 1954 201,958 
Socorro diversion channel, tributaries of 
Rio Grande, New Mexico2 1965 2,259,328 
1. Inactive. 
2. Completed. 
3. Responsibility of local interests. 
4. Assurances of local cooperation received June 22, 1965. 
548

ALBUQUERQUE, N. MEX., DISTRICT 
RIO GRANDE BASIN, N. MEX.: EXISTING PROJECT 
TABLE 17-D (See Section 10 of Text) 
Miles Nearest DrAairneaage Total 
Project River Above Town (square Description Estimated 
Mouth (smquialrTe)o wn Cost 
miles) 
Abiquiu Dam Rio Chama 30 Espanola, 2,147 Earthfill 325 feet high, $ 21,272,299 
N. Mex. 576,700 acre-feet 
capacity 
Jemez Canyon Dam Jemez 2 Bernalillo, 1,034 Earthfill, 136 feet high, 4,177,4171 
N. Mex. 115,800 acre-feet capacity 
Rio Grande Floodway Rio Grande 123 to 3942 - Channel rectification, 13,048,0003 
levee enlargement and 
construction 
Cochiti Lake Rio Grande 3402 Cochiti, 8,491 Earthfill 251 feet high, 63,800,000 
N. Mex. 602,000 acre-feet 
capacity 
Galisteo Dam Galisteo Creek 12 Waldo, 596 Earthfill, 158 feet high, 14,212,510 
N. Mex. 89,800 acre-feet capacity 
$116,510,226 
1. Actual cost 
2. River mile 0 is at intersection of New Mexico-Texas State line with international boundary at El Paso, Texas. 
3. Does not include non-Federal costs. 
RIO GRANDE FLOODWAY, N. MEX.: EXISTING PROJECT 
TABLE 17-E (See Section 10E of Text) 
Location Estimated 
(river miles) Cost 
Truth or Consequences unit (formerly Hot Springs) 123 to 129 2 
San Acacia to Bosque del Apache unit 155 to 226 $6,200,000 
(1960)3 
Cochiti to Rio Puerco unit (not including Albuquerque unit) 236 to 340 2,658,0004 
Albuquerque unit 286 to 305 3,130,0005 
Espanola Valley unit 366 to 394 1,060,000 
(1967)6 
1. River mile 0 being at intersection of New Mexico-Texas State 
line with international boundary at El Paso, Texas. 
2. Truth or Consequences unit of Rio Grande floodway is deferred 
for restudy. Estimated cost of this portion of floodway is not 
available. Originally it was included as part of overall floodway project 
estimated at $3 million. Studies to date do not provide a solution to 
flood problem on tributary arroyos at and near Truth or Consequences, 
New Mexico. Work is being done by Bureau of Reclamation in this 
reach of the river; however, it involves channel rectification only, and 
does not include levee work for flood control which is responsibility 
of Corps. Tributary arroyo problem is considered different 
from one desired in H. Doc. 243, and additional authorization 
may be necessary for its solution. 
3. Deferred for restudy. 
4. In addition, $1,650,000 incurred by Bureau of Reclamation 
in this reach. 
5. In addition, $75,000 incurred by local interests in this reach. 
6. In addition, estimated cost to local interests is $130,000 (1967). 
549

LITTLE ROCK, ARK., DISTRICT* 
This district comprises northern and western portions 
of Arkansas, a portion of southern Missouri, and a 
small portion of eastern Oklahoma embraced in 
drainage basins of Arkansas River and tributaries 
above and exclusive of Pine Bluff, Ark., and below 
mouth of Poteau River, near Fort Smith, Ark., and 
drainage basins of White River and tributaries above 
Peach Orchard Bluff, Ark. In addition, Little Rock 
District has responsibility for planning design, construction, 
operation and maintenance of navigation 
project on Arkansas River below Pine Bluff. Memphis 
District is responsible for navigation maintenance on 
White River between Newport, Arkansas, and mouth 
of Wild Goose Bayou. White River downstream from 
mouth of Wild Goose Bayou is a part of Arkansas River 
Navigation project. 
IMPROVEMENTS 
Navigation Page 
1. Arkansas River Basin, Ark., Okla., and 
K ans. ....................................................... 55 1 
2. Bank stabilization & channel 
rectification, Ark. .................................. 552 
3. David D. Terry lock & dam (No. 6), 
A rk. ......................................................... 552 
4. Lock and dam No. 2, Ark. .................... 553 
5. Lock and dam No. 3, Ark. ................. 553 
6. Lock and dam No. '4, Ark. .................... 553 
7. Lock and dam No. 5, Ark. ................. 553 
8. Lock and dam No. 9, Ark. .................... 553 
9. Lock and dam No. 13, Ark. ............... 553 
10. Maintenance and repair fleet and 
11. 
12. 
marine terminals ................................ 553 
Murray Lock and dam (No. 7), Ark. .. 553 
Norrell Lock and dam (No. 1) and 
entrance channel, Ark ........................ 554 
13. Toad Suck Ferry Lock and dam (No. 
8), A rk ............... ............................... 554 
14. Other authorized navigation projects .... 554 
15. 
16. 
17. 
Flood control 
Blue Mountain Lake, Ark. .................. 
Clearwater Lake, Mo ............................. 
Fourche Creek, Little Rock, Ark. ......... 
554 
554 
555 
18. 
19. 
20. 
21. 
22. 
23. 
24. 
25. 
26. 
27. 
28. 
29. 
30. 
31. 
32. 
33. 
34. 
35. 
Flood Control (cont.) 
Little Rock Levee, Ark. (East 
End-Fourche Bayou) ........................ 
Page 
555 
Nimrod Lake, Ark. ............................... 555 
Pine Mountain Lake, Ark. .................. 556 
Village Creek, White River, and 
Mayberry Levee Districts, Ark. ....... 556 
White River Basin (Little Rock Dist.) 556 
Inspection of completed flood control 
projects ..................................... 557 
Other authorized flood control projects 557 
Flood control work under special 
authorization ..................................... 557 
Multiple-Purpose Projects Including Power 
Beaver Lake, Ark. ................................. 558 
Bull Shoals Lake, Ark. ............................ 558 
Dardanelle lock and dam (No. 10), 
A rk. ............................... .................... 558 
Greers Ferry Lake, Ark. ....................... 558 
Norfork Lake, Ark. ............................... 559 
Ozark lock and dam (No. 12), Ark. .... 559 
Table Rock Lake, Mo. ........................ 559 
General Investigations 
Surveys ......................... ......................... 559 
Collection and study of basic data ....... 560 
Research and development .................. 560 
NAVIGATION 
1. ARKANSAS RIVER BASIN, ARK., 
OKLA., AND KANS. 
Location. Arkansas River rises in Rocky Mountains 
near Leadville, Colo., and flows southeastward 1,459 
miles through Colorado, Kansas, Oklahoma, and 
Arkansas to join Mississippi River 575 miles above 
Head of Passes, La. (See Geological Survey State maps, 
scale 1:500,000.) 
Previous projects. For details see page 1066, Annual 
Report for 1932, and pages 744, 864, and 881, Annual 
Report for 1943. 
Existing project. Provides for improvement of Arkansas 
River Basin by construction of coordinated de- 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
551 
555544 
555

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
velopments for navigation, hydroelectric power, flood 
control, water supply, sediment control, recreation, 
and fish and wildlife propagation. Navigation features 
provide for a channel 9 feet deep and 436.6 miles long, 
beginning at mouth of White River, which enters 
Mississippi River 599 miles above Head of Passes, La., 
thence 10 miles upstream to mouth of Wild Goose 
Bayou; thence 9 miles by a land cut, designated as 
Arkansas Post Canal to mile 42 (1943 survey) on 
Arkansas River; thence 367 miles along channel of 
latter stream to mouth of Verdigris River at mile 460.2; 
thence 50.6 miles up Verdigris River to head of 
navigation at Catoosa, Okla. Waterway will be 
canalized throughout its length by construction of 17 
locks and dams with total lift of 420 feet. Dardanelle, 
Ozark, Robert S. Kerr and Webbers Falls are multiplepurpose 
projects including power. Lock chambers are 
110 by 600 feet. A minimum channel width of 150 feet 
is provided for Verdigris River, 250 feet for Arkansas 
River, and 300 feet for Arkansas Post Canal and White 
River. Other coordinated developments consist of 15 
lakes, of which 13 are in Tulsa District, Kansas and 
Oklahoma, and 2 in Little Rock District. Pertinent 
data and estimated Federal cost are summarized in 
tables on navigation and lakes at end of chapter. (Also 
see table 18-B on authorizing legislation.) 
Local cooperation. For navigation local interests must 
provide adequate terminal and transfer facilities and 
bear increased cost of maintenance and operation of all 
altered rail and highway routes, including bridges and 
appurtenances, utilities, and other existing improvements, 
other than Federally owned. For lakes see 
requirements for each individual lake. 
Terminal facilities. Municipal port facilities are 
operating at Pine Bluff and Little Rock, and are under 
construction for Muskogee and Tulsa. Port authorities 
have been organized to develop facilities for Van 
Buren, Dardanelle and Russellville, North Little Rock, 
Clarksville, and Fort Smith. A permit has been issued 
for construction of the Clarksville facility, and Fort 
Smith's application for a temporary port on the Poteau 
River is being processed. Meanwhile, commercial 
terminal facilities have been completed to serve North 
Little Rock and the Dardanelle-Russellville area. In 
addition, 17 companies are developing private port 
facilities in Arkansas. 
Operations and results during fiscal year. Blue Mountain, 
powerplant at Dardanelle lock and dam, Canton, Elk 
City, Eufaula, Fall River, Fort Gibson, Keystone, 
Locks and Dams Nos. 1, 2, 3, 4, 5, and David D. Terry 
(6), Markham Ferry, Nimrod, Pensacola, Pine Bluff 
Marine Terminal, Tenkiller Ferry, Toronto and 
Wister were in operation. Construction of Locks and 
Dams Nos. 7, 8, 9, and 13, Dardanelle lock, Ozark lock 
and dam, and Dardanelle and Robert S. Kerr Marine 
Terminals was completed. Construction continued on 
Oologah Lake; on powerplant at Ozark lock and dam; 
on W. D. Mayo, Robert S. Kerr and Webbers Falls 
locks and dams; on Lock and Dam Nos. 17 and 18; and 
on bank stabilization. For details of navigation 
facilities and lakes in Oklahoma and Kansas, see report 
of Tulsa District. Details of navigation facilities and 
lakes in Arkansas are shown on following pages. 
Condition at end of fiscal year. See table 18-C and 18-D 
on status of individual items, navigation project, lakes, 
and basin plan. 
2. BANK STABILIZATION & CHANNEL 
RECTIFICATION, ARK. 
Location. Several bank stabilization and channel 
rectification projects are laid out in various reaches 
extending from fixed point to fixed point on Arkansas 
River from 33.7 to 362 miles above mouth and across 
the Arkansas-White Cutoff, a 4- to 5-mile natural 
channel joining Arkansas and White Rivers about 18 
and 12 miles above their respective mouths. 
Existing project. Bank stabilization and channel 
rectification is a part of navigation plan on Arkansas 
River. (See table 18-E for reach and location of each 
bank stabilization and channel rectification project.) 
Estimated cost is $122,300,000. For authorization see 
table 18-B. 
Local cooperation. See requirements for entire project 
under Section 1. 
Operations and results during fiscal year. Inspection was 
made of all existing works, and surveys made of 
damaged portions. Engineering and design studies 
continued for new work and repairs to damaged works. 
Operations by reaches are summarized in table 18-F. 
Condition at end of fiscal year. Emergency bank 
stabilization and channel rectification work on Arkansas 
River in Little Rock District was begun in 
March 1950 and completed in August 1961. Remaining 
bank stabilization and channel rectification 
work proposed for existing project was begun in 
February 1961. Completed work is 89 percent of that 
proposed for existing project in Little Rock District. 
Condition of each reach is summarized in table 18-G at 
end of chapter. 
3. DAVID D. TERRY LOCK & DAM (NO. 
6), ARK. 
Location, previous project, existing project, local cooperation, 
and terminal facilities. See Section 1. 
Operations and results during fiscal year. Major accomplishments 
with regular funds: Construction of 
relocations continued at cost of $6,690,886; minor 
552

LITTLE ROCK, ARK., DISTRICT 
completion items at cost of $683,749; and operation 
and maintenance at cost of $387,025. 
Condition at end of fiscal year. Construction began in 
January 1965 and lock and dam was placed in 
operation in August 1968. 
4. LOCK AND DAM NO. 2, ARK. 
Location, previous project, existing project, local cooperation 
and terminal facilities. See Section 1. 
Operations and results during fiscal year. Major accomplishments 
with regular funds: Operations and 
maintenance continued at cost of $721,874. Minor 
completion items at cost of $1,489,616. 
Condition at end of fiscal year. Construction began in 
May 1963. Lock was placed in operation in April 1967 
and dam was placed in operation in March 1968. 
5. LOCK AND DAM NO. 3, ARK. 
Location, previous project, existing project, local cooperation 
and terminal facilities. See Section 1. 
Operations and results during fiscal year. Major accomplishments 
with regular funds: Construction of 
minor completion items continued at cost of $426,801; 
and operation and maintenance continued at cost of 
$393,854. 
Condition at end of fiscal year. Construction began in 
May 1964 and lock and dam was placed in operation in 
December 1968. 
6. LOCK AND DAM NO. 4, ARK. 
Location, previous project, existing project, local cooperation, 
and terminal facilities. See Section 1. 
Operations and results during fiscal year. Major accomplishments 
with regular funds. Construction of 
relocations continued at cost of $3,776,554; minor 
completion items at cost of $434,085; and operation 
and maintenance continued at cost of $1,051,675. 
Condition at end of fiscal year. Construction began in 
May 1964 and lock and dam was placed in operation in 
December 1968. 
7. LOCK AND DAM NO. 5, ARK. 
Location, previous project, existing project, local cooperation 
and terminal facilities. See Section 1. 
Operations and results during fiscal year. Major accomplishments 
with regular funds: Construction of 
minor completion items continued at cost of $156,179; 
and operation and maintenance continued at cost of 
$311,821. 
Condition at end of fiscal year. Construction began in 
November 1964 and lock and dam was placed in 
operation in December 1968. 
8. LOCK AND DAM NO. 9, ARK. 
Location, previous project, existing project, local cooperation, 
and terminal facilities. See Section 1. 
Operations and results during fiscal year. Major accomplishments 
with regular funds: Lands and damages 
$5,961; relocations $2,756,377; reservoir $20,143; dam 
$66,839; lock $19,746; channels and canals $254,696; 
and permanent equipment $24,278. Operation and 
maintenance continued at cost of $393,228. 
Condition at end of fiscal year. Construction began in 
April 1965 and lock and dam was placed in operation 
in July 1969. 
9. LOCK AND DAM NO. 13, ARK. 
Location, previous project, existing project, local cooperation, 
and terminal facilities. See Section 1. 
Operations and results during fiscal year. Major accomplishments 
with regular funds: Lands and damages 
$212,626; relocations $6,694,968; reservoir $104,820; 
dam $15,446; lock $4,882; permanent roads $9,025; 
channels and canals $59,256; and permanent operating 
equipment $9,025. Operation and maintenance 
continued at cost of $224,961. 
Condition at end of fiscal year. Construction began in 
October 1965 and lock and dam was placed in 
operation in April 1969. 
10. MAINTENANCE AND REPAIR FLEET 
AND MARINE TERMINALS, ARK. 
Location, previous project, existing project, local cooperation, 
and terminafl acilities. See Section 1. 
Operations and results during fiscal year. Major accomplishments 
with regular funds: Complete construction 
of Dardanelle terminal at cost of $159,074, 
and continue acquisition of equipment at cost of $356, 
921. 
Condition at end offiscalyear. Construction of Pine Bluff 
marine terminal began March 1968 and it was placed 
in operation in Ap il 1969. Construction of Dardanelle 
marine terminal began June 1968 and it was placed in 
operation in November 1969. 
11. MURRAY LOCK AND DAM (NO. 7), 
ARK. 
Location, previous project, existing project, local cooperation 
and terminal facilities. See Section 1. 
Operations and results during fiscal year. Major accomplishments 
with regular funds: Lands and damages 
$112,445; relocations $75,358; reservoir $96,320; dam 
$250,543; lock $157,446; permanent roads $118,656; 
channels and canals $551,856; permanent equipment 
$37,925; and recreation facilities $1,450. Operation 
and maintenance continued at cost of $347,041. 
Condition at end of fiscal year. Construction began in 
November 1964 and lock and dam was placed in 
operation in October 1969. 
553

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
12. NORRELL LOCK AND DAM (NO. 1) 
AND ENTRANCE CHANNEL, ARK. 
Location, previous project, existing project, local cooperation 
and terminal facilities. See Section 1. 
Operations and results during fiscal year. Major accomplishments 
with regular funds: Construction of 
relocations continued at cost of $723,682; minor 
completion items at $11,332; and operation and 
maintenance at cost of $319,112. 
Condition at end of fiscal year. Construction began in 
May 1963 and lock and dam was placed in operation in 
June 1967. 
13. TOAD SUCK FERRY LOCK AND DAM 
(NO. 8), ARK. 
Location, previous project, existing project, local cooperation 
and terminal facilities. See Section 1. 
Operations and results during fiscal year. Major accomplishments 
with regular funds: Lands and damages 
$118,612; relocations $1,178,453; reservoir $47,901; 
dam $284,875; lock $220,132; channels and canals 
$217,480; buildings $6,718; and permanent equipment 
$22,742. Operation and maintenance continued at cost 
of $367,978. Major accomplishments with contributed 
funds and other contributions; Complete construction 
of highway bridge on dam $38,059. 
Condition at end of fiscal year. Construction began in 
July 1965 and lock and dam was placed in operation in 
November 1969. 
14. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 18-H.
FLOOD CONTROL 
15. BLUE MOUNTAIN LAKE, ARK. 
Location. See table 18-D on Lakes at end of chapter. 
Existing project. Estimated cost is $5,237,000, of which 
$466,000 are Code 711 funds. For further information 
see pages 906 and 907 of 1962 Annual Report. For 
authorizing legislation see table 18-B under Arkansas 
River Basin. 
Local cooperation. Section 2, 1938 Flood Control Act 
applies. 
Operations and results during fiscal year. Operation and 
maintenance of project continued. Additional recreational 
facilities were constructed. Four notable rises 
occurred on Petit Jean River during fiscal year. 
Flooding was prevented on an average of 5,850 acres of 
improved land for each flood. Results of flood 
regulation on river stages at Danville are set forth in 
table 18-I on Blue Mountain Lake. Danville is 25.6 
miles downstream from dam and just downstream from 
mouth of Dutch Creek, which is the principal tributary 
of PetitJean River. 
Estimated monetary benefits for last fiscal year 
attributed to Blue Mountain Lake for prevention of 
flood damages were $66,000, a total of $5,225,000 to 
June 30, 1969. Pool elevation at start of fiscal year was 
387.29 feet above mean sea level, corresponding to 35, 
100 acre-feet of total storage. At end of fiscal year pool 
elevation was 386.72 feet above mean sea level, 
corresponding to 33,190 acre-feet of total storage. 
Maximum pool level during fiscal year was 402.38 feet 
above mean sea level, corresponding to 109,180 acrefeet 
of total storage. Minimum pool level during fiscal 
year was 383.85 feet above mean sea level, corresponding 
to 24,230 acre-feet of total storage. Seasonal 
conservation pool, elevation 387, was used April 15 to 
May 1. Conservation pool was lowered gradually 
during warm months as an aid in control of mosquitoes. 
Sufficient releases were made from lake during low 
water periods to meet water requirements downstream. 
Condition at end of fiscal year. Project is complete except 
for additional recreation facilities. Construction of 
project began in May 1940, and ready for beneficial 
use in March 1947. 
16. CLEARWATER LAKE, MO. 
Location. See table 18-J White River Basin, at end of 
chapter. 
Existing project. Estimated cost is $10,230,000, of 
which $492,000 are Code 711 funds. For further 
information see pages 897 and 898 of 1962 Annual 
Report. For authorization, see table 18-B on History of 
Authorization at end of chapter. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. Operation and 
maintenance of project continued. Additional recreation 
facilities were constructed. Three notable rises 
occurred on Black River above Clearwater Lake. 
Flooding was prevented on an average of 4,600 acres of 
cultivated land for each rise. Results of regulation on 
river stages at Poplar Bluff, 46.4 miles downstream, are 
set forth in table 18-I on Clearwater Lake. 
Estimated monetary benefits for last fiscal year 
attributed to Clearwater Lake for prevention of flood 
damages were $239,000 making a total of $8,405,000 to 
June 30, 1969. Pool elevation at start of fiscal year was 
497.25 feet above mean sea level, corresponding to 27, 
480 acre-feet of total storage. At end of fiscal year pool 
elevation was 497.37 feet above mean sea level, 
corresponding to 27,700 acre-feet of total storage. 
Maximum pool elevation was 518.88 feet above sea 
level, corresponding to 87,230 acre-feet of total storage. 
Minimum pool level was 493.94 feet above mean sea 
level, corresponding to 21,820 acre-feet of total storage. 
Seasonal conservation pool was raised to elevation 498 
feet on 1 May. Conservation pool elevation was 
fluctuated during warm months as an aid in control of 
mosquitoes. Releases made from lake during low water 
554

LITTLE ROCK, ARK., DISTRICT 
periods were sufficient to supply municipal water for 
Poplar Bluff and other usages. 
Condition at end offiscalyear. Project is complete except 
for additional recreation facilities. Construction of 
project began in June 1940 and was ready for 
beneficial use in March 1948. 
17. FOURCHE CREEK, LITTLE ROCK, 
ARK. 
Location. Fourche Creek Basin is located in central 
Arkansas and extends from Fourche Mountains 
eastward into alluvial plain of Arkansas River. It 
drains an area of 165 square miles. Fourche Creek is 34 
miles long, of which 29 miles are in Pulaski County 
with 7 miles within city limits of Little Rock. The lower 
7 miles of Rock Creek, a major tributary of Fourche 
Creek, are within city limits of Little Rock. (See 
Geological Survey map of Little Rock.) 
Existing project. Provides for increasing channel 
capacity of Fourche and Rock Creeks by channel 
clearing, debris removal, and channel excavation at 
selected locations. On October 3, 1969, Chief of 
Engineers approved channel improvement project on 
Fourche Creek for accomplishment under Section 208 
of the 1954 Flood Control Act. 
Local cooperation. Section 3 of Flood Control Act of 
June 22, 1936 applies. In addition, provide assurances 
that encroachment on improved and unimproved 
channel will not be permitted; and adopt and enforce 
appropriate flood plain regulations which combined 
with structural measures would minimize damages to 
future development within project area that would be 
inundated from a flood that could be expected to occur 
once in 100 years. 
Operations and results during fiscal year. Funds in amount 
of $98,900 were made available. Plans and specifications 
were completed and issued for bids in 
January 1970. Bid opening was postponed because 
local interests failed to provide right-of-way for 
construction and maintenance. 
Condition at end of fiscal year. Plans and specifications 
are complete. Waiting for local interests to meet 
requirements of local cooperation. 
18. LITTLE ROCK LEVEE, ARK. (EAST 
END---FOURCHE BAYOU) 
Location. On right bank of Arkansas River between 
miles 164.5 and 161.2 in eastern part of city of Little 
Rock, Arkansas. (See Geological Survey Map of Little 
Rock, Ark.) 
Existing project. Provides for levee 7.2 miles long 
beginning at high ground in Little Rock opposite mile 
164.5 and extending downstream along Arkansas 
River to mile 161.2 near Fourche Bayou, thence 
upstream along left bank of bayou to mile 14.5 where it 
connects to high ground. Project also provides for a 
sump and borrow area 3,000 feet long on landside of 
levee fronting on Arkansas River, a channel cutoff in 
Fourche Bayou at a bend which is crossed by levee, two 
pumping stations on Arkansas River side, and five 
drainage structures through levee. A 45,000 gallons per 
minute pumping station in conjunction with excavated 
and natural sump area will be constructed on Fourche 
Creek near end of levee where gravity drainage 
through two 36-inch culverts is blocked by high stages. 
Completed levee cost $1,188,277, of which $883,277 
was Federal and $305,000 local interest cost for rightsof-
way. Estimated cost of additional pumping station 
and sump area is $650,000 of which Federal cost is 
$500,000 and local interest cost is $130,000 for rightsof-
way and $20,000 for a cash contribution toward 
construction cost to compensate for any encroachment 
on sump area occurring after District Engineer's 
report. Estimated cost of project is $1,838,277, of which 
$1,383,277 is Federal and $455,000 is local interest cost 
of rights-of-way and cash contribution. (See table 18-B 
on authorizing legislation) 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936 applies. 
Operations and results during fiscal year. Preconstruction 
planning for pumping station continued. 
Condition at end of fiscal year. Levee, two pumping 
stations, sump area, channel cutoff, and five drainage 
structures completed and transferred to local interests 
for maintenance and operation, December 1950. 
Preconstruction planning for pumping station is 65 
percent complete. 
19. NIMROD LAKE, ARK. 
Location. See table 18-D on Lakes at end of chapter. 
Existing project. Estimated cost is $4,157,000, of which 
$385,000 are Code 711 funds. For further information 
see pages 908 and 909 of 1962 Annual Report. For 
authorization see table 18-B, History of Authorization, 
at end of chapter. 
Local cooperation. Section 2, 1938 Flood Control Act 
applies. 
Operations and results during fiscal year. Operation and 
maintenance of project continued. Additional recreation 
facilities were constructed. Five notable rises 
occurred on Fourche La Fave River during fiscal year. 
Flooding was prevented on an average of 4,340 acres of 
improved land for each rise. Results of flood regulation 
of river stages at Aplin are set forth in table 18-I on 
Nimrod Lake. Aplin is 13.7 miles downstream from 
dam and just downstream from mouth of South 
Fourche La Fave River, which is principal tributary. 
Estimated monetary benefits for last fiscal year 
attributed to Nimrod Lake for prevention of flood 
damages were $38,000 making a total of $2,996,000 to 
June 30, 1969. Pool elevation at start of fiscal year was 
345.17 feet above mean sea level corresponding to 41, 
860 acre-feet of total storage. At end of fiscal year pool 
elevation was 344.53 feet above mean sea level, 
corresponding to 39,030 acre-feet of total storage. 
555

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Maximum pool level during fiscal year was 362.36 feet 
above mean sea level, corresponding to 177,600 acrefeet 
of total storage. Minimum pool level during fiscal 
year was 341.81 feet above mean sea level, corresponding 
to 28,340 acre-feet of total storage. Seasonal 
conservation pool was raised to elevation 345 on 1 
May. Conservation pool was lowered gradually during 
warm months as an aid in control of mosquitoes. 
Sufficient releases were made from lake during lowwater 
periods to meet water requirements downstream. 
Condition at end offiscalyear. Project is complete except 
for additional recreation facilities. Construction of 
project began in January 1940 and was ready for 
beneficial use in January 1942. 
20. PINE MOUNTAIN LAKE, ARK. 
Location. Damsite is at mile 35.7 on Lee Creek and 12 
miles north of Van Buren, Ark. (See Geological Survey 
map "Winslow, Arkansas-Oklahoma," scale 1:125, 
000.) 
Existing project. Provides for construction of a lake for 
flood control, water supply, and recreation. Lake 
would control runoff from 168 square miles. Capacity 
would be 124,160 acre-feet, of which 40,320 would be 
for flood control, 81,340 for water supply, and 2,500 for 
sediment reserve. Estimated cost is $13,600,000 of 
which local interests will repay $8,083,000 for water 
supply storage. Project was authorized by 1965 Flood 
Control Act. 
Local cooperation. Section 2, 1938 Flood Control Act, 
Water Supply Act of 1958, as amended, and Federal 
Water Project Recreation Act apply. 
Operations and results during fiscal year. Preconstruction 
planning continued. 
Condition at end of fiscal year. Planning is 40 percent 
complete. Project is 4 percent complete. 
21. VILLAGE CREEK, WHITE RIVER, 
AND MAYBERRY LEVEE DISTRICTS, 
ARK. 
Location. On left bank of White River, 230 to 255 
miles above its mouth, beginning about 2 miles 
southeast of Newport, in Jackson County, Ark., and 
extending downstream to about 5 miles west of Tupelo, 
Woodruff County, Ark. (See Mississippi River Commission 
alluvial valley map, scale 1:500,000 and 1:62, 
500.) 
Existing project. Provides for a system of levees, 
necessary drainage structures, interior drainage and a 
300,000 gallon per minute pumping station at Taylor 
Slough outlet. Levee is about 20 miles long, connecting, 
enlarging and extending former Mayberry levee and 
Stevens-Keel levee. Ten drainage structures were 
provided, 2 of which are reinforced concrete and 8 
corrugated metal. Project protects 34,000 acres of farm 
land with crest grade 2 feet above confined height of 
1927 flood. Interior drainage and pumping station 
would prevent flooding on about 9,000 acres when 
drainage structures through levee are closed. Estimated 
cost is $2,293,310, of which $1,623,310 is Federal cost of 
construction. Estimated cost to local interests is $670, 
000, of which $149,000 is cash contribution to cost of 
pumping station, $399,000 is cost of rights-of-way and 
$122,000 is cost of local drainage facilities. (See table 
18-B on authorizing legislation.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Construction 
continued on fish and wildlife facilities at cost of $16, 
711; on channels and canals at cost of $91,216; and on 
pumping station at cost of $145,740. 
Condition at end of fiscal year. Construction of levee and 
drainage structures was completed in fiscal year 1941 
and transferred to local interests for maintenance and 
operation. Construction of interior drainage facilities 
and pumping station initiated June 1968. Project is 99 
percent complete. 
22. WHITE RIVER BASIN (LITTLE ROCK 
DIST.) 
Location. Improvements are on White River and 
tributaries, Arkansas and Missouri. More definite 
location of individual items is shown in table 18-J on 
White River Basin at end of chapter. 
Existing project. A general comprehensive plan for 
flood control and other purposes in White River Basin. 
Plan now includes nine lakes, of which four are floodcontrol-
only projects and five are multiple-purpose 
projects. Beaver, Table Rock, Bull Shoals, Norfork, 
Clearwater, and Greers Ferry Lakes were selected and 
approved for construction by Chief of Engineers, and 
individual reports on these six lakes are on subsequent 
pages. Lakes in plan are listed in table 18-J on White 
River Basin. (See also table 18-B on authorizing 
legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Water Supply Act of 1958 applies to Beaver 
and Norfork. 
Operations and results during fiscal year. One notable rise 
occurred above Beaver, Table Rock, and Bull Shoals 
Dams on Upper White River and above Norfork Dam 
on North Fork River during fiscal year. Regulation of 
flow on North Fork River in Norfork Lake and on 
upper White River in Beaver-Table Rock-Bull Shoals 
Lake system during fiscal year prevented flooding on 
31,800 acres of improved land of which 24,920 and 6, 
880 was credited to Beaver-Table Rock-Bull Shoals 
system and Norfork respectively. Flood modifications 
on White River at Calico Rock, 17 miles downstream 
from mouth of North Fork River and 59 miles 
downstream from Bull Shoals Dam, and at Newport, 
102 miles downstream from Calico Rock, are set forth 
in tables 18-J and 18-K on flood modifications on 
White River. 
Estimated monetary flood control benefits for last 
fiscal year attributed to Beaver, Table Rock, Bull 
556

LITTLE ROCK, ARK., DISTRICT 
Shoals, and Norfork Lakes for prevention of flood 
damages were $78,000, $188,000, $519,000, and $159, 
000, respectively, a total of $944,000. Total flood 
damages prevented by lakes through fiscal year 1969 
amounted to $20,938,000 of which 320,000 accrues to 
Beaver, $3,522,000 to Table Rock, $11,282,000 to Bull 
Shoals, and $5,814,000 to Norfork. Pool elevation at 
Beaver Lake at start of fiscal year was 1,117.06 feet 
above mean sea level, corresponding to 1,570,500 acrefeet 
of total storage. At end of fiscal year pool elevation 
was 1,118.02 feet above mean sea level, corresponding 
to 1,596,700 acre-feet of total storage. Maximum pool 
elevation was 1,118.27 corresponding to 1,603,600 
acre-feet of total storage. Minimum pool elevation was 
1,101.04 corresponding to 1,175,300 acre-feet of total 
storage. Pool elevation of Table Rock Lake at start of 
fiscal year was 913.65 feet above mean sea level, 
corresponding to 2,644,300 acre-feet of total storage; 
and at end of fiscal year was 915.02 feet above mean sea 
level, corresponding to 2,702,900 acre-feet of total 
storage. Maximum pool elevation during fiscal year 
was 917.38 feet above mean sea level, corresponding to 
2,805,700 acre-feet of total storage. Minimum pool 
elevation during fiscal year was 903.20 feet above mean 
sea level, corresponding to 2,229,800 acre-feet of total 
storage. Pool elevation of Bull Shoals Lake at start of 
fiscal year was 651.50 feet above mean sea level, 
corresponding to 2,936,000 acre-feet of total storage; 
and at end of fiscal year was 653.95 feet above mean sea 
level, corresponding to 3,045,800 acre-feet of total 
storage. Maximum pool elevation was 658.59 feet 
above mean sea level, corresponding to 3,261,300 acrefeet 
of total storage. Minimum pool elevation was 
644.94 feet above mean sea level, corresponding to 2, 
656,500 acre-feet of total storage. Pool elevation of 
Norfork Lake at start of fiscal year was 552.38 feet 
above mean sea level, corresponding to 1,259,500 acrefeet 
of total storage. At end of fiscal year pool elevation 
was 553.54 feet above mean sea level, corresponding to 
1,285,300 acre-feet of total storage. Maximum pool 
elevation was 554.92 feet above mean sea level, 
corresponding to 1,316,400 acre-feet of total storage. 
Minimum pool elevation was 530.91 feet above mean 
sea level, corresponding to 845,500 acre-feet of total 
storage. Delivered 1,067,425,000 kilowatt-hours of 
electrical energy to Southwestern Power Administration 
for marketing, of which 110,825,900; 350, 
348,000; 470,256,000; and 135,995,100 kilowatt-hours 
were generated at Beaver, Table Rock, Bull Shoals, 
and Norfork powerplants, respectively. Peak demands 
of 126,000 kilowatts occurred May 21, 1970, at Beaver; 
232,000 kilowatts on May 7, 1970 at Table Rock; 397, 
000 kilowatts on May 24, 1970 at Bull Shoals; and 77, 
000 kilowatts on June 12, 1970 at Norfork. There was 
sufficient power storage at all times to supply scheduled 
loads. Installed capacities of plants are 112,000, 200, 
000, and 340,000, and 70,000 kilowatts at Beaver, 
Table Rock, Bull Shoals, and Norfork, respectively. 
During fiscal year 663,410; 1,915,400; 2,655,630; and 
924,100 acre-feet of water were released through 
turbines at Beaver, Table Rock, Bull Shoals, and 
Norfork, respectively. At start of fiscal year 81,400, 57, 
700, 112,000, and 36,200 acre-feet of storage capacity 
were available for storage of floodflows in Beaver, 
Table Rock, Bull Shoals, and Norfork power pools, 
respectively. At end of fiscal year there were 55,200, 2, 
200, and 10,400 acre-feet of storage capacity available 
for storage of floodflows in Beaver, Bull Shoals, and 
Norfork power pools, respectively, and 900 acre-feet of 
flood control storage in use in Table Rock. Capacities 
available in power pools before each flood are shown in 
table 18-K at end of chapter. During fiscal year 21,900 
acre-feet of water was released from Norfork Lake for 
Fish and Wildlife Service trout hatchery, 14,600 acrefeet 
was released from Table Rock Lake for Missouri 
Conservation Commission trout hatchery, Beaver 
Water District withdrew 2,403 million gallons from 
Beaver Lake and Water and Sewer Improvement 
District No. 3 of Mountain Home, Arkansas, withdrew 
72 million gallons from Norfork Lake. 
Condition at end of fiscal year. Beaver, Table Rock, Bull 
Shoals, Norfork, Clearwater, and Greers Ferry Lakes 
are essentially complete and in operation. Progress on 
these lakes is in individual reports. Construction of 
Water Valley, Bell Foley, and Lone Rock has not 
started. Preconstruction planning is 62 percent complete 
for Water Valley Lake, 17 percent complete for 
Lone Rock Lake, and 10 percent complete for Bell 
Foley Lake. 
23. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Approved regulations for operation and maintenance 
of flood control works, part 208 of title 33, 
Code of Federal Regulations, provide for periodic 
inspection of completed projects transferred to local 
interests for operation and maintenance. Inspections of 
local flood-protection projects, shown in Section 24 as 
completed projects, were made October-March to 
determine extent of compliance with approved regulations 
for maintenance and operation of these 
projects. Responsible officials of improvement districts 
concerned were advised of inadequacies in maintenance 
and operation of local flood-protection works 
under their jurisdiction where appropriate. Fiscal year 
costs were $120,743. Total cost to end of fiscal year was 
$106,834. 
24. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 18-L. 
25. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency flood control activities-repair, flood fighting, and 
rescue work (Public Law 99, 84th Cong., and antecedent 
legislation) 
557 
451-584 0-72-36

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Federal cost for fiscal year was $29,969 of which $28, 
969 was for advance preparation and $1,000 for flood 
emergency operations at Batesville, Arkansas. 
MULTIPLE-PURPOSE PROJECTS 
INCLUDING POWER 
26. BEAVER LAKE, ARK. 
Location. See table 18-J on White River at end of 
chapter. 
Existing project. Estimated cost is $47,238,000, of 
which $1,245,000 are Code 711 funds and $932,000 are 
Code 712 funds. For further information see pages 788 
and 789 of 1966 Annual Report. For authorization see 
table 18-B History of Authorization at end of chapter. 
Local cooperation. Section 2, Flood Control Act of 1938 
and Water Supply Act of 1958 apply. 
Operations and results during fiscal year. Results of 
operation of Beaver Lake are shown in Section 22 and 
flood modifications are shown in table 18-K at end of 
chapter. Operation and maintenance continued. Additional 
recreation facilities were constructed. 
Condition at end of fiscal year. Project is complete except 
for additional recreation facilities. Construction of 
project began in October 1959 and was placed in 
operation for flood control in December 1963, hydroelectric 
power generation with both units in May 
1965, and water supply in January 1966. 
27. BULL SHOALS LAKE, ARK. 
Location. See table 18-J on White River Basin at end 
of chapter. 
Existing project. Estimated cost with eight generating 
units is $91,460,000, of which $2,211,000 are Code 711 
funds and $3,295,000 are Code 712 funds. For further 
information see pages 725 and 726 of 1965 Annual 
Report. For authorization see table 18-B on History of 
Authorization at end of chapter. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. Additional 
recreation facilities were constructed. Operation and 
maintenance of project continued. Results of operation 
of Bull Shoals Lake are shown in Section 22 and flood 
modifications are shown in table 18-K at end of 
chapter. 
Condition at end of fiscal year. Project is complete except 
for additional recreation facilities. Construction of 
project began in April 1946 and was ready for 
beneficial use for flood control in June 1951 and 
generation of electrical energy in September 1952. 
Units 1 through 8 were placed in operation September 
1952, September 1952, December 1952, June 1953, 
January 1962, February 1962, August 1963, and 
September 1963, respectively. 
28. DARDANELLE LOCK AND DAM (NO. 
10), ARK. 
Location. See Section 1, Navigation table 18-C at end 
of chapter. 
Existing project. Project is a unit of Arkansas River 
navigation plan. Dam is 2,569 feet long, and 68 feet 
high. It has a spillway with 20 tainter gates 50 feet long, 
and 39 feet high. Navigation lock is 110 by 600 feet 
with a lift of 54 feet. Powerhouse contains four 31,000- 
kilowatt generators. Lake has a storage capacity of 486, 
000 acre-feet. Estimated cost is $83,449,000, of which 
$1,149,000 are Code 711 funds. For authorization see 
table 18-B on history of authorization at end of 
chapter. 
Local cooperation. See Section 1. 
Operations and results during fiscal year. Pool fluctuated 
within 2-foot power pondage, elevation 336 to 338. 
Power generation continued. Installed capacity is 124, 
000 kilowatts. Delivered 674,418,600 kilowatt-hours of 
electrical energy to Southwestern Power Administration 
for marketing. Peak demand of 140,000 
kilowatts occurred September 22, 1969. Released 17, 
926,250 acre-feet of water through turbines. Major 
accomplishments with regular funds: Operation and 
maintenance $1,094,095; minor completion items 
$316,076; complete construction of lock $1,116,199; 
and channel dredging $1,923,056. 
Condition at end of fiscal year. Construction began June 
1957. Power units were placed on line April, May, and 
September 1965, and January 1966. Lock was placed 
in operation in December 1969. 
29. GREERS FERRY LAKE, ARK. 
Location. See table 18-J on White River Basin at end 
of chapter. 
Existing project. Estimated cost is $50,058,000, of 
which $3,013,000 are Code 711 funds. For further 
information see page 740 of 1964 Annual Report. For 
authorization see table 18-B on history of authorization 
at end of chapter. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. Operation and 
maintenance continued. Additional recreation facilities 
were constructed. Four notable rises occurred on 
Little Red River above Greers Ferry Dam. Flooding 
was prevented on an average of about 6,910 acres of 
improved land for each rise. Results of flood regulation 
on river stages atJudsonia, about 54 miles downstream, 
are set forth in table 18-I on Greers Ferry Lake. 
Estimated monetary flood control benefits for last 
fiscal year attributed to Greers Ferry Lake for 
prevention of flood damages were $62,000. Total flood 
damages prevented to June 30, 1969 were $540,000. 
Pool elevation at start of fiscal year was 459.43 feet 
above mean sea level, corresponding to 1,861,400 acrefeet 
of total storage. At end of fiscal year pool elevation 
558

LITTLE ROCK, ARK., DISTRICT 
was 460.48 feet above mean sea level, corresponding to 
1,894,100 acre-feet of total storage. Maximum pool 
elevation was 462.78 feet above mean sea level, 
corresponding to 1,967,000 acre-feet of total storage. 
Minimum pool elevation was 448.02 feet above mean 
sea level corresponding to 1,527,600 acre-feet of total 
storage. Capacity available in power pool for storage of 
floodflows at start of fiscal year was 112,600 and at end 
of fiscal year capacity available in power pool for 
storage of flood flows was 79,900 acre ft. Delivered 135, 
900,200 kilowatt-hours of electrical energy to Southwestern 
Power Administration for marketing. Peak 
demand of 110,000 kilowatts occurred September 5, 
1969. During fiscal year, 845,500 acre-feet of water was 
released through turbines, and 14,600 acre-feet was 
released for U.S. Fish and Wildlife Service trout 
hatchery. 
Condition at end offiscalyear. Project is complete except 
for additional recreation facilities. Construction of 
project began in June 1957, was ready for beneficial use 
for flood control in January 1962, and power units 1 
and 2 were placed in operation in March and May 
1964, respectively. 
30. NORFORK LAKE, ARK. 
Location. See table 18-J on White River Basin at end 
of chapter. 
Existing project. Estimated cost is $30,238,000, of 
which $1,516,000 are Code 711 funds. For further 
information see page 896 of 1962 Annual Report. For 
authorization see table 18-B on history of authorization 
at end of chapter. 
Local cooperation. Section 2, Flood Control Act of 1938 
and Water Supply Act of 1958 apply. 
Operations and results during fiscal year. Operation and 
maintenance of project continued. Additional recreation 
facilities were constructed. Results of operation 
of Norfork Lake are shown in Section 22 and flood 
modifications are shown in table 18-K at end of 
chapter. 
Condition at end offiscalyear. Project is complete except 
for additional recreation facilities. Construction of 
project began in October 1940, ready for beneficial use 
for flood control in June 1943, and for generation of 
electrical energy with one unit in June 1944. Second 
unit was added in February 1950. Water and Sewer 
Improvement District No. 3 of Mountain Home, 
Arkansas started using Norfork Lake for municipal 
and industrial water supply in December 1969. 
31, OZARK LOCK AND DAM (NO. 12), 
ARK. 
Location. See Navigation table 18-C at end of chapter. 
Existing project. Project is a unit of Arkansas River 
navigation plan. Dam is 2,200 feet long and 58 feet 
above streambed. It has a spillway with 15 tainter gates 
50 feet long and 46 feet high. Navigation lock is 110 by 
600 feet with a lift of 34 feet. Powerhouse will contain 
five 20,000-kilowatt generators. Lake has a storage 
capacity of 148,000 acre-feet. In addition 1 foot of 
power pondage is provided in pool No. 13 between 
elevations 391 and 392. Estimated cost is $79,600,000. 
For authorization see table 18-B on history of authorization 
at end of chapter. 
Local cooperation. See Section 1. 
Operations and results during fiscal year. Major accomplishments 
with regular funds: Lands and damages 
$864,155; relocations $1,868,185; reservoir $350,205; 
dam $101,866; lock $159,447; power plant $3,730,592; 
channels and canals $779,544; levees and floodwalls 
$234,719; pumping station $32,150; buildings and 
grounds $3,548; and permanent equipment $28,949. 
Construction of phase II portion of powerhouse was 
started November 1969. Initiate operation and maintenance 
at cost of $441,852. 
Condition at end of fiscal year. Construction began in 
December 1964 and is 69 percent complete. Lock and 
dam was placed in operation in November 1969. Work 
remaining consists principally of completion of powerplant. 
32. TABLE ROCK LAKE, MO. 
Location. See table 18-J on White River Basin at end 
of chapter. 
Existing project. Estimated cost is $67,614,000, of 
which $2,174,000 are Code 711 funds. For further 
information see page 893 of 1962 Annual Report. For 
authorization see table 18-B on history of authorization 
at end of chapter. 
Local cooperation. Section 2, 1938 Flood Control Act 
applies. 
Operations and results during fiscal year. Operation and 
maintenance continued. Additional recreation facilities 
were constructed. Results of operation of Table 
Rock Lake are shown in Section 22 and flood 
modifications are shown in table 18-K at end of 
chapter. 
Condition at end offiscalyear. Project is complete except 
for additional recreation facilities. Construction of 
project began in October 1952, was ready for beneficial 
use for flood control in November 1958 and for 
generation of electrical energy with units 1 and 2 in 
May 1959. Units 3 and 4 were added in April and June 
1961, respectively. 
GENERAL INVESTIGATIONS 
33. SURVEYS 
Fiscal year costs were $203,325 of which $104,536 for 
flood control studies, $1,218 for special studies, and 
$97,571 for comprehensive basin studies. 
559

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
34. COLLECTION AND STUDY OF BASIC 
DATA. 
Flood plain information studies were completed for 
the Arkansas River and tributaries in Pulaski County, 
Arkansas, Part I; and were initiated and completed for 
Crooked Creek and tributaries at Harrison, Arkansas, 
and for the James River and tributaries at Springfield, 
Missouri, Part II. Technical services and guidance 
were furnished to other Federal and local agencies. 
Fiscal year cost was $124,911. See table on completed 
flood plain studies at end of Chapter. 
35. RESEARCH AND DEVELOPMENT 
During the fiscal year 174 stream-gaging stations 
were operated, of which 58 were operated cooperatively 
by Geological Survey and Corps, and 
remainder independently by one or other of these 
agencies. Suspended sediment samples were collected 
at 42 stations during fiscal year in cooperation with 
Geological Survey, and suspended loads were determined 
at certain stations. 112 rainfall anc/or river 
reporting stations were operated in a cooperative 
program by Weather Bureau and Corps for use in 
forecasting streamflow for flood warning and operation 
of lake projects. Records also were collected at certain 
hydroclimatic rainfall stations under a cooperative 
program of the two agencies. General hydrologic 
studies relating to streamflow frequency and distribution 
were continued. Cost for fiscal year was $6, 
598, of which $4,985 was for engineering studies and 
$1,613 for hydrologic studies. 
560

TABLE 18-A 
See 
Section 
in Text Project 
1. Arkansas River 
Basin, Ark., 
Okla., & Kans. 
2. Bank Stabilization 
& Channel 
Rectification, 
Ark. 
3-13. Navigation 
Locks & Dams, 
Ark. 
15. Blue Mountain 
Lake, Ark. 
6. Clearwater 
Lake, Mo. 
17. Fourche Creek, 
Little Rock, 
Ark. 
LITTLE ROCK, ARK., DISTRICT 
COST AND FINANCIAL STATEMENT 
Funding 
New Work 
Approp. 
Dams 
Navigation 
Cost 
Dams 
Navigation 
Maint. 
Approp. 
Dams 
Navigation 
Cost 
Dams 
Navigation 
Rehab. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Special Funds 
Cost 
Other 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Other 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Total to 
FY67 FY/* FY69 FY70 June 30, 1970 
138,611,328 
119,470 
138,491,858 
137,694,327 
380,653 
137,313,674 
5,131,080 
1,977,600 
3,153,480 
5,025,404 
1,935,833 
3,089,571 
137,330 
88,118 
141,775 
4,485,000 
4,854,793 
171,897 
71,636,858 
73,106,399 
749,000 
635,701 
18,000 
88,118 
14.1,775 
16,894 
17,168 
159,200 
135,535 
16,982 
17,354 
143,500 
145,475 
126,014,091 
389,641 
125,624,450 
116,494,227 
404,379 
116,089,848 
5,608,100 
2,077,600 
3,530,500 
5,589,020 
2,284,404 
3,304,616 
197,834 
126,636 
2,387,000 
1,849,742 
50,195,000 
44,068,001 
854,900 
795,780 
159,526 
126,636 
49,000 
39,829 
159,200 
165,968 
39,200 
20,787 
180,400 
181,621 
121,701,888 
8,666 
121,693,222 
110,216,037 
31,090 
110,184,947 
8,035,828 
2,343,828 
5,692,000 
7,101,710 
2,185,929 
4,915,781 
677,888 
62,569 
196,144 
3,370,000 
3,052,974 
45,700,000 
37,638,408 
2,770,000 
2,050,143 
677,88 
23,059 
196,144 
9,162 
168,907 
172,526 
18,410 
211,072 
199,247 
93,001,145 
83,220 
92,917,925 
103,014,781 
4,379 
103,010,402 
11,062,129 
2,475,523 
8,586,606 
11,191,065 
2,529,606 
8,661,459 
614,081 
38,059 
2,360,000 
654,015 
26,375,037 
30,951,250 
4,336,605 
4,518,581 
573,848 
38,059 
15,000 
2,121 
169,951 
188,187 
7,000 
2,466 
305,593 
315,863 
98,900 
22,506 
1,264,532,098 
146,325,226 
1,118,206,872 
1,243,979,669 
146,245,813 
1,097,733,856 
57,766,392 
26,865,725 
30,900,667 
56,214,573 
26,634,851 
29,579,722 
291,106 
291,106 
1,609,842 
1,492,508 
19,926,775 
19,926,775 
531,336 
531,336 
111,401,184 
108,831,626 
4,561,666. 
4,561,666 
328,694,5721 
318,212,472 
8,710,505 
8,000,205 
973,385 
857,331 
531,336 
531,336 
4,976,044 
4,963,156 
2,092,894 
2,091,026 
9,931,4432 
9,926,9062 
2,264,455 
2,256,805 
98,900 
22,506 
561

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 18-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
18. Little Rock New Work 
Levee, Ark. 
(East End- 
Fourche Bayou) 
19. Nimrod Lake, 
Ark. 
20. Pine Mountain 
Lake, Ark. 
21. Village Creek, 
White River & 
Mayberry Levee 
Districts, Ark. 
22. White River 
Basin (Little 
Rock District) 
26. Beaver Lake, 
Ark. 
27. Bull Shoals 
Lake, Ark. 
28. Dardanelle Lock 
& Dam (No. 10), 
Ark. 
29. Greers Ferry 
Lake, Ark. 
30. Norfork Lake, 
Ark. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
14,803 
24,364 
145,300 
150,732 
75,000 
58,399 
6,605 
999,303 
1,253,657 
2,487,620 
2,604,042 
350,000 
547,886 
312,117 
308,206 
135,821 
135,646 
606,233 
669,741 
475,000 
692,850 
539,980 
514,392 
340,300 
453,999 
448,320 
475,153 
49,290 
49,540 
441,463 
449,647 
30,600 
26,099 
182,400 
191,408 
200,000 
109,009 
320,000 
13,044 
149,000 
19,234 
822,500 
622,926 
3,095,700 
3,074,224 
41,000 
120,934 
509,300 
496,130 
387,100 
89,770 
658,500 
652,817 
3,825,000 
2,526,492 
610,100 
606,708 
175,000 
163,376 
637,100 
625,093 
79,300 
69,454 
486,100 
529,357 
30,000 
25,346 
4,501 
160,821 
160,365 
218,000 
238,592 
509,000 
551,445 
92,544 
1,065,994 
497,199 
3,890,972 
3,757,497 
386,841 
56,608 
790,271 
767,705 
681,000 
327,421 
856,270 
800,989 
8,016,006 
8,647,591 
665,500 
672,405 
-7,847 
79,057 
742,161 
725,581 
9,822 
598,007 
588,051 
3,295 
9,000 
1,120 
179,530 
179,544 
22,000 
104,553 
84,500 
280,008 
37,079 
-471,038 
114,953 
5,433,277 
5,215,134 
-95,000 
39,974 
932,271 
901,136 
-440,000 
45,567 
1,106,190 
1,095,362 
3,768,000 
3,689,653 
1,103,852 
1,094,095 
12,962 
10,478 
1,001,720 
968,921 
28,000 
3,004 
935,556 
846,764 
iV" /av V v a f" "v a 
562 
913,2773 
911,918 
3,926,617 
3,918,737 
2,307,378 
2,304,477 
515,000 
510,553 
1,570,3104 
1,489,3744 
149,000 
148,857 
285,301,400s 
284,901,040s 
31,968,802 
31,478,242 
45,352,405 
45,153,012 
2,938,159 
2,863,188 
87,025,1296 
86,858,9676 
8,738,073 
8,652,131 
81,738,5227 
80,950,009 
3,522,032 
3,481,319 
47,401,812 
47,339,248 
4,016,718 
3,937,487 
29,020,383 
28,995,363 
8,124,491 
8,006,954

TABLE 18-A (Continued) 
LITTLE ROCK, ARK., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
31. Ozark Lock & New Work 
Dam (No. 12), Approp. 11,710,000 11,570,000 10,285,000 9,192,000 54,743,5128 
Ark. Cost 11,673,940 11,299,520 9,756,839 9,972,401 54,580,273 
Maint. 
Approp. - - 50,0009 531,361 581,361 
Cost - - - 441,852 441,852 
32. Table Rock New Work 
Lake, Mo. Approp. 106,910 100,900 6,000 16,000 65,957,25610 
Cost 49,232 158,606 5,881 13,464 65,954,572 
Maint. 
Approp. 535,987 624,300 693,191 1,151,947 5,886,906 
Cost 555,821 589,205 675,925 1,087,088 5,761,677 
1. Includes $77,762 prior to 1952 and $1,552,416 for 
general studies. 
2. Includes $47,103 Public Works acceleration funds. 
3. Includes $883,277 for work completed in 1950. 
4. Includes $532,310 for portion completed July 1940. 
5. Includes $491,928 Public Works acceleration funds. 
6. Includes $259,312 Public Works acceleration funds. 
7. Includes $402,162 for general studies. 
8. Includes $168,012 for general studies. 
9. $50,000 was not reported in 1969. 
10. Includes $185,513 Public Works acceleration funds. 
563

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 28, 1938 
Aug. 18, 1941 
July 24, 1946 
July 24, 1946 
June 30, 1948 
May 17, 1950 
July 14, 1960 
June 22, 1936 
Dec. 22, 1944 
Oct. 27, 1965 
June 22, 1936 
July 14, 1960 
Oct. 23, 1962 
ARKANSAS RIVER BASIN, ARK., OKLA., & KANS. 
(See Section 1 of Text) 
Approved General comprehensive plan: 
Mannford Reservoir, Okla. 
Oologah Reservoir, Okla. 
Canton Reservoir, Okla. 
Tenkiller Ferry Reservoir, Okla. 
Wister Reservoir, Okla. 
Blue Mountain Reservoir, Ark. 
Nimrod Reservoir, Ark. 
Modified comprehensive plan to include reservoirs in 
Grand (Neosho) River Basin, Okla. and Mo., and in 
Verdigris River Basin. 
Markham Ferry Reservoir, Okla. 
Fort Gibson Reservoir, Okla. 
Pensacola Reservoir, Okla. 
Fall River Reservoir, Kans. 
Elk City Reservoir, Kans. 
Toronto Reservoir, Kans. 
Neodosha Reservoir, Kans. 
Authorized Chief of Engineers to provide in the Canton 
Reservoir 69,000 acre-feet of irrigation storage, 
subject to certain conditions. 
Approved multiple-purpose plan. 
Oologah Reservoir, Okla. 
Markham Ferry Reservoir, Okla. 
Fort Gibson Reservoir, Okla. 
Blackburn Reservoir, Okla. 
Mannford Reservoir, Okla. 
Taft Reservoir, Okla. 
Bank stabilization 
Dardanelle lock and dam, Ark. 
Eufaula Reservoir, Okla. 
Navigation locks and dams 
Ozark lock and dam, Ark. 
Short Mountain lock and dam, Okla. 
Webbers Falls lock and dam, Okla. 
Tenkiller Ferry Reservoir, Okla. 
Modified Arkansas River navigation comprehensive plan to 
include bank protection works at Bradens Bend, Okla. 
Modified comprehensive plan authorized in 1938 Flood 
Control Act and multiple-purpose plan authorized in 
River and Harbor Act of 1946 to provide for 
substituting Keystone Reservoir for Mannford, 
Blackburn, and Taft Reservoirs. 
Authorized incorporation of River and Harbor and Flood 
Control plans, into a single plan of development and 
made all previous authorizations applicable to 
combined plan of development. 
LITTLE ROCK LEVEE, ARK., (EAST END-FOURCHE BAYOU) 
(See Section 18 of Text) 
Levees to provide flood protection to people and city 
property. 
Modified local flood protection project to raise 
grade and protect additional areas. 
Authorized 45,000 g.p.m. pump station and excavated 
storage area. 
VILLAGE CREEK, WHITE RIVER, AND MAYBERRY LEVEE 
DISTRICTS, ARK. (See Section 21 of Text) 
Approved levee protection. 
Modified existing project to add interior drainage in 
accordance with plan I, and directed study of plan III. 
Modified project to provide a pumping plant. 
564 
TABLE 18-B 
Flood Control Committee 
Document 1, 75th Congress, 
1st sess. 
House Documents in 107 and 440, 
76th Cong., 1st sess. 
H. Doc. 758, 79th Cong., 
2d sess. 
S. Doc. 107, 81st Cong., 
1st sess. 
H. Doc. 308, 74th Cong., 1st sess. 
H. Doc. 447, 78th Cong., 2d sess. 
S. Doc. 55, 89th Cong., 1st sess. 
H. Doc. 102, 73d Cong., 1st sess. 
H. Doc. 225, 86th Cong., 1st sess. 
H. Doc. 577, 87th Cong., 2d sess.

LITTLE ROCK, ARK., DISTRICT 
TABLE 18-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
WHITE RIVER BASIN (LITTLE ROCK DISTRICT) (See Section 22 
of Text) 
June 28, 1938 Approved comprehensive plan for White River Basin. F.C. Comm. Doc. 1, 
Lone Rock Reservoir, Ark., Norfork Reservoir, Ark., 75th Cong., 1st sess. 
Clearwater Reservoir, Mo., Water Valley Reservoir, Ark., 
Bell Foley Reservoir, Ark., Greers Ferry Reservoir, 
Ark., and White River emergency. 
Aug. 18, 1941 Modified comprehensive plan to include Bull Shoals H. Doc. 917, 76th Cong., 3d sess. 
Reservoir, Ark., and Mo., Table Rock Reservoir, Mo., H. Doc. 290, 77th Cong., 1st sess. 
and Ark., and Norfork Reservoir, Ark., and Mo. (power). 
Sept. 3, 1954 Authorized power in Greers Ferry Reservoir and added H. Doc. 499, 83d Cong., 2d sess. 
Beaver Reservoir to the plan. 
ARKANSAS RIVER BASIN; ARK., OKLA., AND KANS.: NAVIGATION 
TABLE 18-C (See Section 1 of Text) 
Miles Eleva- Year 
UUpp-- LLoocckk Lift Utpiopneorr Depth on Miter Character of Kind of Type of or TToottaall 
Feature stream Miles to Nearest Town Dimensions Percent Estimated 
from (feet) (feet) Pool Sill Foundation Dam Construction 
Mouth
1 (feet, Upper Lower plete 
Mouth m. s. !.) (feet) (feet) 
LITTLE ROCK 
DISTRICT 
Norrell Lock and Dam 
Lock 2 
Dam 2 
Lock and dam 3 
Lock and dam 4 
Lock and dam 5 
David D. Terry lock and 
dam(6) 
Murray lock and dam 
Lock and dam 8 
Lock and dam 9 
Dardanelle lock and 
dam (10) 
Lock and dam 11 
Ozark lock and dam (12) 
Lock and Dam 13 
10.4 8 east of Arkansas Post, Ark. 110 by 600 30 max. 
13.2 6 east of Arkansas Post, Ark. 110 by 600 20 nom. 
28 max. 
40.5 3 southeast Arkansas Post, - - 
Ark. 
49.3 5 north of Grady, Ark. 
65.0 7 east of Pine Bluff, Ark. 
85.0 4 southeast of Redfield, Ark. 
106.3 12 southeast of Little Rock, 
Ark. 
123.0 6 northwest of Little Rock, 
Ark. 
152.9 6 west of Conway, Ark. 
173.4 3 southwest of Morrilton, 
Ark. 
201.2 2 west of Dardanelle, Ark. 
- Deleted 
251.0 1 east of Ozark, Ark. 
286.8 7 east of Fort Smith, Ark. 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
20 
14 
17 
18 
18 
16 
19 
54 
34 
20 
142 16 15 Piles in sand Fixed Concrete 
overflow 
162 18 14 Piles in sand - 
- - - Piles in sand Movable Gated concrete 
spillway with 
embankment 
ends 
182 18 14 Piles in sand Movable Gated concrete 
spillway with 
embankment 
ends 
196 18 14 Piles in sand Movable Gated concrete 
spillway with 
embankment 
ends 
213 18 14 Clay Movable Gated concrete 
spillway with 
embankment 
ends 
231 18 14 Piles in sand Movable Gated concrete 
spillway with 
embankment 
ends 
249 18 14 Shale Movable Gated concrete 
spillway with 
embankment 
ends 
265 18 14 Shale Movable Gated concrete 
spillway with 
embankment 
ends 
284 18 14 Shale Movable Gated concrete 
spillway with 
embankment 
ends 
338 17 14 Sandstone Movable Gated concrete 
spillway with 
embankment 
ends 
372 18 17 Sandstone Movable Gated concrete 
and shale spillway with 
embankment 
ends 
392 18 14 Sandstone Movable Gated concrete 
and shale spillway with 
embankment 
ends 
1967 $33,760,0002 
1967 
1968 
1968 
1968 
1968 
1968 
1969 
1969 
1969 
1969 
1969 
1969 
39,600,000 
33,000,000 
39,800,000 
28,600,000 
58,800,000 
29,100,000 
28,800,000 
31,800,000 
83,449,000 
79,600,000 
42,900,000 
565

TABLE 18-C (Cont'd) 
ARKANSAS RIVER BASIN; ARK., OKLA., AND KANS.: NAVIGATION 
(See Section 1 of Text) 
Miles Eleva- Year 
Up- Lock Lift tion Depth on miter ChKid of Type of or Total 
Feature stream Miles from to Nearest Town Dimensions Lift Upper Sill aracterof d Tpeon Percent Estimated f (feet) Pool Foundation Dam Construction Coi- Cost 
Mouth eet)(feet, Upper Lower plete 
m.s.l.) (feet) (feet)plete 
TULSA DISTRICT4 
Lock and dam 13 (part) - - - - - - - - - - 72 $ 6,900,000 
W. D. Mayo Lock and Dam 14 313.7 4 east of Redland, Okla. 110 by 600 20 412 18 14 Rock Movable Gated concrete 81 33,200,000 
spillway with 
embankment 
ends 
Robert S. Kerr lock and 330.3 1 north of Cowlington, Okla. 110 by 600 48 460 18 14 Rock Movable Gated concrete 93 92,000,000 
dam 15 spillway with 
embankment 
ends 
Webbers Falls lock and 359.3 1 northwest of Gore, Okla. 110 by 600 30 490 18 14 Rock Movable Gated concrete 69 80,300,000 
dam 16 spillway with 
embankment 
ends 
Lock and dam 17 393.2 4 northwest of Okay, Okla. 110 by 600 21 511 18 14 Rock Movable Gated concrete 88 31,800,000 
spillway with 
embankment 
ends 
Lock and dam 18 412.9 8 southwest of Inola, Okla 110 by 600 21 532 18 14 Rock Movable Gated concrete 85 43,400,000 
spillway with 
embankment 
ends 
Additional features entering into cost of project 
Little Rock District: Upstream reservoirs: 
Bank stabilization and channel rectification, mile 33.7 to 362 and Arkansas- Oologah 90.2 miles upstream from mouth, Verdigris River, 91 percent 
White Cutoff, 89 percent complete........................$122,300,000 complete..... .............................. $ 46,200,000 
Maintenance and repair fleet and marine terminals, 55 percent complete 7,200,000 Keystone 538.8 miles upstream from mouth, Arkansas River, 
Total, Little Rock District.......................$658,709,0003 complete ..... ....... ....................... 123,901,000 
Eufaula, 27 miles upstream from mouth, Canadian River, complete 121,775,000 
Navigation aids (U. S. Coast Guard)...........................$ 2,268,000 Subtotal............ ........... $ 291,876,000 
Tulsa District: Total, Tulsa District ...................... .$ 594,516,000 
Bank stabilization and channel rectification, Short Mountain to Fort Smith, 
98 percent complete. ................................ $ 12,700,000 Total, Project Cost, 88 percent complete ......... $1,255,493,000 
Maintenance and repair fleet and marine terminals, 86 percent complete 2,340,000 
Subtotal ..... ................................ $302,640,000 
1. Navigation mileage from mouth of White River, except Dam 2 is 40.5 miles above mouth of 4. Detail report of individual features in Tulsa District Report. 
Arkansas River. 5. Includes $9,600,000 for additional water supply facilities. Estimated cost of ultimate 
2. Includes cost of entrance channel. development including power - $50,400,000. 
3. Includes $1,149,000 Code 711 funds. 
bT 
0
z
z
Co 
0

LITTLE ROCK, ARK., DISTRICT 
ARKANSAS RIVER BASIN, ARK., OKLA., AND KANS. 
LAKES 
TABLE 18-D (See Section 1 of Text) 
Drainage Height 
Nearest Town Area of Dam 
(sq. miles) (feet) 
Reservoir Power Year or Total 
Type Capacity Development Percent Estimated 
(acre-feet) (kilowatts) Complete Cost 
Blue Mountain, Ark. 
Canton, Okla. 
Elk City, Kans. (Table Mound) 
Eufaula, Okla.1, 2 
Fall River, Kansas 
Fort Gibson, Okla.1 
Keystone, Okla. 
2' 
3 
Markham Ferry, Okla.1,' 4 
Neodesha, Kansas 
5 
Nimrod, Ark. 
Oologah, Okla.
2 
Pensacola, Okla. 1, 6 
Tenkiller Ferry, Okla.l 
Toronto, Kansas 
Wister, Okla. 
Petit Jean 
North Canadian 
Elk 
Canadian 
Fall 
Grand (Neosho) 
Arkansas 
Grand (Neosho) 
Verdigris 
Fourche La Fave 
Verdigris 
Grand (Neosho) 
Illinois 
Verdigris 
Poteau 
74.4 Paris, Ark. 
394 Canton, Okla. 
9 Independence, Kans. 
27 Eufaula, Okla. 
54
8 
539 
47 
223 
62.6 
90.2 
77 
13 
271.5 
61 
Fall River, Kansas 
Fort Gibson, Okla. 
Sand Springs, Okla. 
Pryor, Okla. 
Neodesha, Kansas 
Danville, Ark. 
Claremore, Okla. 
Disney, Okla. 
Gore, Okla. 
Toronto, Kansas 
Wister, Okla. 
Subtotal, exclusive of Eufaula, Keystone and Oologah, 87 percent complete .... . . ... . $ 168,105,397 
Total, Arkansas River Basin, 88 percent complete .................. . ..... $1,423,598,397 
1. Project includes facilities for production of hydroelectric power. 5. Inactive. Estimate is based on 1954 price levels. 
2. Cost included in navigation project. 6. Constructed by State of Oklahoma under the name Grand River Dam (Lake O' the 
3. Added as substitution for Mannford and by deletion of Taft and Blackburn Reservoirs. Cherokees). Estimate shown is for Federal participation. 
4. Constructed by State of Oklahoma under the name of Robert S. Kerr Dam (Lake 
Hudson). Estimate shown is for Federal participation. 
TABLE 18-E 
BANK STABILIZATION AND CHANNEL RECTIFICATION: 
REACH AND LOCATION 
(See Section 2 of Text) 
Reach Location of Reach 
Fort Smith to Mill Creek Mountain Miles 362 to 327 
Mill Creek Mountain to Morrisons Bluff Miles 327 to 285 
Dardanelle Rock to Morrilton Bridge Miles 257 to 221 
Morrilton Bridge to Fourche La Fave Miles 221 to 192 
Fourche La Fave to Little Rock Miles 192 to 165.5 
Little Rock to Jefferson County Free Bridge Miles 165.5 to 115.6 
Jefferson County Free Bridge to Rob Roy Bridge Miles 101.7 to 891 
Rob Roy Bridge to Arkansas Post Miles 89 to 421 
Arkansas Post to Mile 33.7 Miles 42 to 33.71 
Arkansas-White Cutoff Miles 5 to 02 
1. River mileage from 1943 survey. 
2. Arkansas-White Cutoff mileage from 1949 survey. 
567 
Lake and State 
Miles 
River Above 
Mouth 
488 
12,483 
634 
47,522 
585 
12,492 
74,506 
11,533 
1,152 
680 
4,339 
10,298 
1,610 
730 
993 
115 
73 
107 
114 
94 
110 
121 
90 
74 
97 
137 
147 
197 
90 
99 
Earthfill 
Earthfill 
Earth fill 
Earth fill 
Earthfill 
Concrete gravity 
Earthfill 
Earth fill 
Earthfill 
Concrete gravity 
Earthfill 
Concrete arch 
Earthfill 
Earthfill 
Earthfill 
258,000 
386,000 
291,000 
3,848,000 
259,000 
1,284,400 
1,879,000 
444,500 
90,000 
336,000 
1,519,000 
2,197,000 
1,230,800 
195,300 
430,000 
1947 
1948 
1966 
90,000 1965 
- 1949 
45,000 1953 
70,000 1968 
100,000 1964 
0 
1942 
91 
- 1941 
34,000 1953 
- 1960 
1949 
$ 5,237,000 
11,126,000 
19,043,000 
121,775,000 
10,494,413 
42,709,000 
123,901,000 
6,908,756 
18,100,000 
4,157,000 
46,200,000 
2,090,000 
23,845,000 
13,894,002 
10,501,226

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
BANK STABILIZATION AND CHANNEL RECTIFICATION: FY 70 
OPERATIONS 
TABLE 18-F (See Section 2 of Text) 
New Work (Contract) 
Completed Initiated or Con. 
Revet- Revet- Pilot Removal Cost 
ments ments Channel of Dikes of 
(River Miles) (lin. ft.) (lin. ft.) (lin. ft.) (lin. ft.) Excavation 
(cu. yd.)t.) Work 
362 to 327 5,612 282 - - - $ 96,797 
327 to 285 - - - - 0 
257 to 221 - - - - 0 
221 to 192 1,402 10,720 - - - 160,335 
192 to 165.5 - - - - - 0 
165.5 to 115.6 - - - - - - 0 
101.7 to 89 
1 
- - - - - - 0 
89 to 42 
1 - - - - - 1,090 
42 to 33.7
1 - - - - - 0 
-5 to 02 - - - - - - 0 
Lands and damages $ 37,040 
1. River mileage from 1943 survey. 
2. Arkansas-White cutoff mileage from 1949 survey - contract work was completed for capping out the Arkansas-White River cutoff closure 
structure in FY 65. 
TABLE 18-G BANK STABILIZATION AND CHANNEL RECTIFICATION: CONDITION - 
JUNE 30, 1970 
(See Section 2 of Text) 
Completed Work Work Under Way 
Pilot Pilot 
Channel Channel 
Excava- Revet- Excava- Revet- 
Reach tion Dike ments tions Dike ments Date Percent 
(river miles) (cu. yds.) (lin. ft.) (lin. ft.) (cu. yd.) (lin. ft.) (lin. ft.) Begun Complete 
362 to 327 4,013,769 102,395 163,253 - - - Jan 54 85 
327 to 285 799,065 53,632 97,485 - - - Sep 54 77 
257 to 221 1,977,782 90,855 148,867 - - - May 50 89 
221 to 192 2,087,889 84,851 108,312 - - - Mar 50 79 
192 to 165.5 - 75,946 106,442 - - - Mar 60 80 
165.5 to 115.6 9,860,931 143,104 253,126 - - - Jun 50 90 
101.7 to 0 (1) 19,340,832 238,582 384,453 - - - 1950 97 
Lands and damages 77 
1. River mileage from 1943 survey. Includes Arkansas-White 
River closure structure. 
568

LITTLE ROCK, ARK., DISTRICT 
TABLE 18-H OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Name of Project Report for Construction Maintenance 
Black River, Ark., and Mo.
1 1950 80,000 658,222 
Current River, Ark., and Mo.
1 
1964 17,0002 132,178 
Upper White River, Ark.
3 
'
4 
1952 813,197 1,788,374 
White River, Ark., (above Peach 
Orchard Bluff)
1 
,
5 
1950 - 785,666 
1. Channel adequate for existing commerce. Completion not 4. Completed. 
contemplated. 5. Responsibility for maintenance of project downstream 
2. Includes $7,000 for previous project. from Newport, Ark., transferred to Memphis District in fiscal 
3. Federal operation and maintenance terminated June 30, year 1962. 
1952, due to lack of commerce. Facilities at locks and dams Nos. 
1, 2, and 3 disposed of in accordance with authority in Public 
Law 996, 84th Congress. 
TABLE 18-I FLOOD MODIFICATIONS 
Outflow 
Coincident Estimated 
with Peak Maximum Experi- Crest 
Peak Downstream Pool Eleva- Corre- enced Appreciable Stage Estimated 
See Inflow Flow tion (feet sponding Crest Overflow Without Reduction 
Section Date of (cubic feet (cubic feet Above Mean Storage Stage Begins Dam in Stage 
in Text Project Peak Flow per second per second) Sea Level) (Acre-Feet) Nearby Town (feet) (feet) (feet) (feet) 
15. Blue Mountain 26 July 1969 32,000 25 399.30 89,300 Danville, Ark. 22.6 17.0 
Lake, Ark. 29 Dec 1969 7,000 1,000 388.90 40,700 Danville, Ark. 18.7 17.0 
3 March 1970 4,500 25 388.40 39,100 Danville, Ark. 16.5 17.0 
19 Apr 1970 16,500 25 402.38 109,180 Danville, Ark. 23.6 17.0 
16. Clearwater 3 Mar 1970 5,500 170 502.36- 37,720 Poplar Bluff, 7.65 12 
Lake, Mo. Mo. 
20 Apr 1970 15,000 500 514.30 70,740 Poplar Bluff, 15.65 12 
Mo. 
1 May 1970 12,500 170 518.88 87,230 Poplar Bluff, 12.80 12 
Mo. 
19. Nimrod Lake, 27 July 1969 50,400 1,300 359.34 144,930 Aplin, Ark. 12.8 17 
Ark. 30 Dec 1969 19,000 10 352.98 89,140 Aplin, Ark. 23.8 17 
4 Mar 1970 15,000 10 350.75 73,400 Aplin, Ark. 17.4 17 
20 Apr 1970 24,600 20 356.88 121,360 Aplin, Ark. 28.1 17 
26 Apr 1970 12,000 20 361.20 164,430 Aplin, Ark. 16.2 17 
29. Greers Ferry 29 Dec 1969 18,700 3,000 451.17 1,615,700 Judsonia, Ark. 22.2 30 
Lake, Ark. 3 Mar 1970 50,000 850 451.75 1,631,900 Judsonia, Ark. 17.7 30 
19 Apr 1970 27,000 200 455.94 1,755,300 Judsonia, Ark. 17.0 30 
25 Apr 1970 45,000 320 461.45 1,924,700 Judsonia, Ark. 31.0 30 
25.6 
22.6 
21.8 
26.0 
14.10 
17.40 
16.90 
33.4 
31.6 
29.4 
32.7 
29.3 
31.3 
33.8 
30.5 
37.2 
3.0 
3.9 
5.3 
2.4 
6.45 
1.75 
4.10 
20.6 
7.8 
12.0 
4.6 
13.1 
9.1 
16.1 
13.5 
6.2 
569

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 18-J WHITE RIVER BASIN 
(See Section 22 of Text) 
Drainage 
Miles Area Reservoir Power De- Total 
Above (square Height of Dam Above Streambed Capacity velopment Estimated 
Lake River Mouth Nearest Town miles) and Type (acre-feet) (kilowatts) Cost 
t 
Beaver 
2 
White 609.0 Eureka Springs, Ark. 1,186 228 feet concrete-gravity and earthfill 1,952,000 112,000 $47,238,000 
Bell Foley
3 
Strawberry 26.2 Smithville, Ark. 520 133 feet earthfill 518,000 4 29,400,000 
Bull Shoals
2 
White 418.6 Cotter, Ark. 6,036 258 feet concrete-gravity 5,408,000 340,000 91,460,000 
Clearwater
2 
Black 257.4 Piedmont, Mo. 898 154 feet earthfill 413,000 4 10,230,000 
Greers Ferry
2 
Little Red 79.0 Heber Springs, Ark. 1,146 243 feet concrete-gravity 2,844,000 96,000 50,058,000 
Lone Rock
6 
Buffalo 3.6 Norfork, Ark. 1,331 216 feet concrete-gravity 687,000 4 29,460,000 
Norfork 
2 
North Fork 4.8 Norfork, Ark. 1,806 222 feet concrete-gravity 1,983,000 70,000 30,238,000 
Table Rock 
2 
White 528.8 Branson, Mo. 4,020 252 feet concrete-gravity and earthfill 3,462,000 200,000 67,614,000 
Water Valley
7 
Eleven Point 12.6 Pocahontas, Ark. 1,152 157 feet earthfill 1,563,000 s 18,300,000 
Total 18,830,000 818,000 373,998,000 
1. July 1970 price levels unless otherwise noted. 5. Includes provisions for future power installation. 
2. For details of this project, see individual report. 6. To be restudied. Estimated cost based on July 1954 price levels. 
3. Active. 7. To be restudied. Estimated cost based on November 1965 price levels. 
4. None. 
TABLE 18-K WHITE RIVER FLOOD MODIFICATIONS 
(See Section 22 of Text) 
Outflow Coincident Maximum Pool Storage Available 
Project and Peak Inflow with Peak Down- Elevation (Feet Corresponding in Power Pool 
Date of (Cubic Feet Stream Flow (Cubic Above Mean Sea Storage at Start of Flood 
Peak Inflow Per Second) Feet Per Second) Level (Acre-Feet) (Acre-Feet) 
Beaver 
1 May 1970 23,000 1,500 1118.26 1,603,400 64,500 
Table Rock 
1 May 1970 46,000 11,500 917.38 2,805,700 80,400 
Bull Shoals 
19 April 1970 46,000 2,000 658.59 3,261,300 93,100 
Norfork 
19 April 1970 42,000 20 555.05 1,319,400 306,100 
. Calico Rock, Ark.1 Newport 2 
Estimated Crest Stage Estimated Estimated Crest Stage Estimated 
Date Peak Experienced Without Norfork, Reduction Experienced Without Norfork, Reduction 
Inflow at Crest Stage Beaver, Table Rock in Stage Crest Stage Beaver, Table Rock in Stage 
Bull Shoals (feet) and Bull Shoals (feet) (feet) (feet) and Bull Shoals (feet) (feet) 
19 April 1970 18.6 27.3 8.7 25.7 28.7 3.0 
1. Appreciable overflow begins at 19 feet. 
2. Appreciable overflow begins at 18 feet. 
570

LITTLE ROCK, ARK., DISTRICT 
TABLE 18-L OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Name of Project Report for Construction Maintenance 
Bell Foley Reservoir, White River, Ark.6 68,309 
Black River, Poplar Bluff, Mo., to 
Knobel, Ark.' 1958 584,315 
Carden's Bottom Drainage District No. 2, 
Ark. River, Ark.1 1951 919,955 
Clarksville, Ark.1 1962 271,717 
Conway County Drainage and Levee District 
No. 1, Arkansas River, Ark.' 1959 187,440 
Conway County Levee Districts Nos. 1, 
2, and 8, Arkansas River, Ark.' 1952 1,018,840 
Conway County Levee District No. 6, 
Arkansas River, Ark.' 1952 390,952 
Crawford County Levee District, Arkansas 
River, Ark.' 1954 2,001,820 
Crooked Creek, Reservoir and Levee, Ark. 1969 
East Poplar Bluff and Poplar Bluff, Mo. 1 1958 304,699 
Faulkner County Levee District No. 1, 
Arkansas River, Ark.' 1941 99,511 
Fort Smith, Arkansas River, Ark.1 1951 1,077,546 
From North Little Rock to Gillett, Ark. 
(above Plum Bayou)' 1954 845,300 
Holla Bend Bottom, Arkansas River, Ark.2 1962 17,610 
Lone Rock Reservoir, White River, Ark.4 - 130,653 - 
McLean Bottom Levee District No. 3, 
Arkansas River, Ark.1 1950 422,549 
Near Dardanelle, Arkansas River, Ark.1 1953 198,069 
Newport, White River, Ark. l 1941 314,2761 
North Little Rock, Arkansas River, Ark.1 1958 512,0011 
PetitJean River, Ark. 1 ,s 1966 84,3501,'5 
Roland Drainage District, Arkansas River, 
Ark.' 1950 269,907 
Skaggs Ferry, Black River, Ark.1 1941 81,023 
South Bank Arkansas River (Head Fourche 
Island to Pennington Bayou), Ark.' 1964 1,404,852 
South Bank Arkansas River, Little Rock to 
Pine Bluff, Ark., Tucker Lake' 1961 409,115 
Van Buren, Arkansas River, Ark.' 1952 438,222 - 
Village Creek, Jackson and Lawrence Counties, 
White River, Ark.3 
Water Valley Reservoir, White River, Ark., 
and Mo.4 - 414,011 
West of Morrilton, Arkansas River, Ark.1 1962 1,269,959 
1. Completed. 4. Deferred for restudy. Flood Control Committee Doc. 1, 
2. Deauthorized. 75th Cong., 1st sess. 
3. See H. Doc. 352, 87th Cong., 2d sess., for description of 5. Authorized by Chief of Engineers. 
project. 6. Deferred for restudy in 1953, reclassified as active in 
1970. 
571

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 18-M COMPLETED FLOOD PLAIN STUDIES 
(See Section 34 of Text) 
Location Requesting Agency Date Completed Federal Cost 
Black River at Pocahontas, Ark. City of Pocahontas, Ark. February 1968 $19,861 
Arkansas River at North Little Rock, Ark. City of North Little Rock, Ark. June 1968 20,248 
Wilson Creek and Tributaries City of Springfield, Mo. November 1968 19,071 
Arkansas River and tributaries City of Russellville, Ark. February 1969 22,984 
City of Dardanelle, Ark. 
Fourche Creek and Tributaries City of Little Rock, Ark. June 1969 23,985 
Arkansas River and Tributaries Pulaski County, Ark. (Part I) November 1969 20,558 
Crooked Creek and Tributaries at City of Harrison, Ark. February 1970 21,443 
Harrison, Ark. 
James River and Tributaries at City of Springfield, Mo. June 1970 22,898 
Springfield, Mo. (Part II) 
572

TULSA, OKLA., DISTRICT* 
District comprises southern Kansas, small portions of 
southwestern Missouri and western Arkansas, northern 
Oklahoma, northern portion of Texas Panhandle, and 
small portions of northeastern New Mexico and 
southeastern Colorado, embraced in drainage basin of 
Arkansas River, and its tributaries above mouth of 
Poteau River, inclusive, and below mouth of Walnut 
Creek near Great Bend, Kans., exclusive of that 
portion of watershed of South Canadian River and its 
tributaries west of Texas-New Mexico State line; and a 
portion of western Arkansas, northern portion of 
Texas, and southern portion of Oklahoma embraced in 
drainage basin of Red River and its tributaries above 
Fulton, Ark. 
IMPROVEMENTS 
Navigation Page 
1. Arkansas River Basin, Ark. and Okla. 574 
2. Bank Stabilization and Channel 
Rectification, Ark. and Okla. ............. 574 
3. Low Head Locks and Dams, Okla. ...... 574 
3A. Lock and Dam No. 13, Channel 
Improvement, Okla. ......................... 574 
3B. W. D. Mayo Lock and Dam (No. 14), 
O kla. .................................................. 575 
3C. Chouteau Lock and Dam (No. 17), 
Okla. ........................................ 575 
3D. Newt Graham Lock and Dam (No. 
18), O kla. .......................................... 575 
4. Maintenance and Repair Fleet and 
Marine Terminals, Okla. ................. 575 
5. Other Authorized Navigation Project ... 576 
Flood Control 
6. Arkansas-Red River Chloride Control, 
Tex., Okla., and Kans ................. 576 
6A. Experimental Water Quality Study 
Projects, Red River Basin, Tex. ........ 576 
6B. Ark-Red Chloride Control, 
Supplemental Studies, Okla .......... 576 
6C. Ark-Red Chloride Control, Part I, Tex. 576 
7. Big Hill Lake, Verdigris River Basin, 
K ans . ...................... ............................ 577 
8. Candy Lake, Verdigris River Basin, 
Okla ....................................... ...... 577 
9. Canton Lake, Arkansas River Basin, 
Okla. ........................................ 577 
10. Cherry and Red Fork Creeks, Okla. .... 577 
11. Clayton Lake, Red River Basin, Okla. 577 
12. Copan Lake, Verdigris River Basin, 
O kla . ............................... ................... 578 
13. Council Grove Lake, Grand (Neosho) 
River Basin, Kans. ............................ 578 
14. Cow Creek, Kans. ................................. 578 
15. Crutcho Creek, Okla. ........................... 579 
16. DeQueen Lake, Red River Basin, Ark. 579 
* All cost and financial statements for projects are listed at the 
appear at the end of this chapter. 
451-584 0-72-37 
Flood Control (cont.) Page 
17. Dierks Lake, Red River Basin, Ark. .... 579 
18. El Dorado Lake, Arkansas River Basin, 
Kans. ........................................ ..... 579 
19. Elk City Lake, Arkansas River Basin, 
Kans ........................................ 580 
20. Fall River Lake, Arkansas River Basin, 
Kans. ........................................ 580 
21. Fort Supply Lake, North Canadian 
River, Okla. ..................................... 580 
22. Gillham Lake, Red River Basin, Ark. 580 
23. Great Salt Plains Lake, Salt Fork of 
Arkansas River, Okla. ...................... 581 
24. Hugo Lake, Kiamichi River, Okla. ...... 581 
25. Hulah Lake, Caney River, Okla ........ 581 
26. John Redmond Dam and Reservoir, 
Grand (Neosho) River Basin, Kans.. 581 
27. Kaw Lake, Arkansas River, Okla ....... 582 
28. Lake Kemp, Wichita River, Tex. ....... 582 
29. Lukfata Lake, Red River Basin, Okla. 582 
30. Marion Lake, Grand (Neosho) River 
Basin, Kans. ........................................ 583 
31. Millwood Lake, Red River Basin, Ark. 583 
32. Oologah Lake, Arkansas River Basin, 
O kla. ..................................................... 583 
33. Optima Lake, North Canadian River, 
Okla. ........................................ 584 
34. Pat Mayse Lake, Red River Basin, 
Tex. ........................................ 584 
35. Pine Creek Lake, Red River Basin, 
Okla. ........................................ 584 
36. Polecat Creek, Okla. (Heyburn Lake 
and Channel Improvement) ............. 585 
37. Red River Below Denison Dam (Tulsa 
District) ........................................ 585 
38. Shidler Lake, Arkansas River Basin, 
O kla. ..................................................... 585 
39. Skiatook Lake, Verdigris River Basin, 
O kla. .......................... ...... ........ 585 
end of this chapter. All other tables are referenced in text and also 
73

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Flood Control (cont.) Page 
40. Toronto Lake, Arkansas River Basin, 
Kans. ........................................ 586 
41. Waurika Lake, Red River Basin, Okla. 586 
42. Wister Lake, Arkansas River Basin, 
Okla. ........................................ 586 
43. Inspection of Completed Flood Control 
Projects ........................................ 586 
44. Scheduling Flood Control Reservoir 
Operations ..................................... 587 
45. Other Authorized Flood Control 
Projects ..................................... 587 
46. Flood Control Work Under Special 
Authorization ..................................... 587 
Multiple-Purpose Projects Including Power 
47. Broken Bow Lake, Red River Basin, 
Okla. ..................................... 587 
48. Denison Dam-Lake Texoma, Red 
River, Tex. and Okla .................... 587 
Page 
49. Eufaula Lake, Canadian River, Okla. . 588 
50. Fort Gibson Lake, Arkansas River 
Basin, Okla. ........................................ 588 
51. Keystone Lake, Arkansas River, Okla. 589 
52. Lake Hudson, Arkansas River Basin, 
Okla. ........................................ 589 
53. Pensacola Lake, Arkansas River Basin, 
O kla. ................................................... 589 
54. Robert S. Kerr Lock and Dam and 
Reservoir (No. 15), Arkansas River, 
O kla.. ...................................................... 589 
55. Tenkiller Ferry Lake, Arkansas River 
Basin, Okla ...................................... 590 
56. Webbers Falls Lock and Dam (No. 16), 
Arkansas River, Okla ..................... 590 
57. 
58. 
59. 
General Investigations 
Surveys ................................................. 
Collection and Study of Basic Data ..... 
Research and Development .................... 
591 
591 
591 
NAVIGATION 
1. ARKANSAS RIVER BASIN, ARK. AND 
OKLA. 
Multiple-purpose plan authorizing features that 
serve navigation, flood control, and hydroelectric 
power purposes and afford storage for water supply, 
water quality control, sediment control, recreation, 
and fish and wildlife propagation in the Arkansas 
River Basin within Tulsa District are listed in table 19- 
C on Arkansas River Basin. For a comprehensive 
understanding of overall work authorized and accomplished 
under this heading, see Little Rock 
District's section of this report. 
Amounts authorized to be appropriated for combined 
comprehensive and multiple-purpose plan total 
$1,340,453,000. Project features on which construction 
has been initiated are reported separately in this 
section. 
2. BANK STABILIZATION AND 
CHANNEL RECTIFICATION, ARK. 
AND OKLA. 
Location. Bank stabilization, cutoffs, and channel 
improvement work in reach of Arkansas River between 
Robert S. Kerr Dam site and Fort Smith, Ark., river 
miles 395.4 and 362, respectively. (See Geological 
Survey maps for Sans Bois (Okla.), Sallisaw (Okla.), 
and Fort Smith (Ark.-Okla.) quadrangles, scale 1:125, 
000.) 
Existing project. Consists of training dikes, cutoffs, 
revetments, and other channel work, forms a unit in 
plan for navigation of Arkansas River. Final cost is $12, 
700,000. (See table 19-B for authorizing legislation). 
Corrective bank stabilization in reach between Wilsons 
Rock and Fort Smith will also protect the critical 
location on the right bank near Bradens Bend, Okla. 
Therefore bank protection work authorized for that 
area by Flood Control Act of 1948 will not be required. 
Local cooperation. See requirements for entire project. 
Operations and results during fiscal year. All project 
structures were operated and maintained in a serviceable 
condition. 
Condition at end of fiscal year. Bank stabilization and 
channel rectification works from Wilsons Rock upstream 
to Robert S. Kerr Dam site were initiated May 
1955. Additional structures and construction of protective 
works for bridges and channel in area where 
degradation is expected from operation of navigation 
channel began in April 1968. The project was 
completed December 1969. 
3. LOW HEAD LOCKS AND DAMS, 
OKLA. 
There will be three lock-and-dam units on Arkansas 
and Verdigris Rivers in addition to Robert S. Kerr and 
Webbers Falls. With some channel cutoffs and enlargement 
work they will provide a navigable channel 
9 feet deep from Fort Smith, Ark., to vicinity of 
Catoosa, Okla., where a turning basin will be provided. 
(See table 19-B for authorizing legislation.) A more 
detailed description for low head locks and dams is in 
following paragraphs. Total estimated cost of low head 
locks and dams, including turning basin, channel 
cutoffs and enlargement is $105,200,000. 
3A. LOCK AND DAM NO. 13, CHANNEL 
IMPROVEMENT, ARKANSAS RIVER 
Location. Fort Smith, Ark. to W. D. Mayo Lock and 
Dam. 
Existing project. Consists of channel cutoffs and 
enlargement work to provide a navigable channel 9 
574

TULSA, OKLA., DISTRICT 
feet deep with a minimum width of 250 feet from Fort 
Smith, Ark., to W. D. Mayo Lock. For additional 
information see Little Rock District's section of this 
report. 
Local cooperation. See requirements for entire project. 
Operations and results during fiscal year. Channel 
dredging continued. 
Condition at end of fiscal year. Dredging began in 1968 
and is continuing. 
3B. W. D. MAYO LOCK AND DAM, 
ARKANSAS RIVER 
Location. Four miles east of Redland, Okla. 
Existing project. An earthfill dam, spillway, navigation 
lock, and appurtenant facilities. Structure will have a 
length of 7,400 feet, a height of 35 feet above streambed 
and will include a gated spillway consisting of a low 
concrete apron and sill, a navigation lock, and earth 
embankments. The fixed structure has a foundation of 
shale. Spillway will have twelve 60- by 21-foot tainter 
gates. Navigation lock will be 110 feet wide and 600 
feet long with a lift of 20 feet. The normal pool 
elevation will be 412 feet mean sea level. The minter 
sill depths at normal pool will be 15 feet for the upper 
pool and 15 feet for the lower pool. Project controls a 
drainage area of 148,084 square miles. Project is a unit 
in multiple-purpose plan for navigation of Arkansas 
River. (See table 19-B for authorizing legislation.) 
Local cooperation. See requirements for entire project. 
Operation and results during fiscal year. Construction 
continued on embankment, spillway, and lock structure. 
Planning, design, and acquisition of land continued. 
Construction continued on railroad relocation 
and channel dredging. Right abutment access road, 
bank stabilization, and supply contracts are complete. 
Condition at end of fiscal year. Construction began in 
May 1966 and is 81 percent complete. 
3C. CHOUTEAU LOCK AND DAM, 
VERDIGRIS RIVER 
Location. Four miles northwest of Okay, Okla. 
Existing project. An earthfill dam, a spillway, navigation 
lock, and appurtenant facilities. Structure has a 
length of about 13,000 feet, a height of 50 feet above 
streambed and includes a gated spillway consisting of a 
low concrete apron and sill, a navigation lock, and an 
earthen embankment. The fixed structures have a 
foundation of shale for the lock and limestone for the 
spillway. The lock is located on a channel cutoff while 
the spillway is on the main river channel. They are 
connected by an earthen embankment. Spillway 
consists of three 60- by 27-foot tainter gates. A 24-footwide 
service bridge has been constructed on spillway 
for access to lock. Navigation lock is 110 feet wide and 
600 feet long with a lift of 21 feet. The normal pool 
elevation will be 511 feet mean sea level. The miter sill 
depths at normal pool will be 15 feet for the upper pool 
and 17 feet for the lower pool. Project controls drainage 
area of 8,270 square miles. Project is a unit in multiplepurpose 
plan for navigation of Arkansas River. (See 
table 19-B for authorizing legislation.) 
Local cooperation. See requirements for entire project. 
Operations and results during fiscal year. Construction of 
embankment, spillway, lock structure, segment I of the 
navigation channel, county road, and utilities relocations 
are complete. State road relocations, acquisition 
of land, and segment II of navigation channel 
continued. 
Condition at end of fiscal year. Construction began in 
July 1966 and is 88 percent complete. 
3D. NEWT GRAHAM LOCK AND DAM, 
VERDIGRIS RIVER 
Location. Eight miles southwest of Inola, Okla. 
Existing project. An earthfill dam, spillway, navigation 
lock, and appurtenant facilities. Structure will have a 
length of about 7,300 feet, a height of 50 feet above 
streambed, and will include a gated spillway consisting 
of a low concrete apron and sill, a navigation lock, and 
an earthen embankment. The fixed structure has a 
foundation of shale. Spillway will have three 60- by 27- 
foot tainter gates. Navigation lock will be 110 feet wide 
and 600 feet long with a lift of 21 feet. The normal pool 
elevation will be 532 feet mean sea level. The miter sill 
depths at normal pool will be 15 feet for the upper pool 
and 14 feet for the lower pool. Project controls a 
drainage area of 8,030 square miles. Project is a unit in 
multiple-purpose plan for navigation of Arkansas 
River. (See table 19-B for authorizing legislation.) 
Local cooperation. See requirements for entire project. 
Operations and results during fiscal year. Construction of 
highway relocations, embankment, spillway, lock 
structure, and segments I and II of the navigation 
channel continued. -Acquisition of land and supply 
contracts continued. Access roads, turning basin and 
relocation of county roads and utilities are complete. 
Condition at end of fiscal year. Construction began in 
October 1966 and is 85 percent complete. 
4. MAINTENANCE AND REPAIR FLEET 
AND MARINE TERMINALS, OKLA. 
Includes two terminals in the Little Rock District, 
and one terminal in the Tulsa District to be located 
between Fort Smith, Ark. and Catoosa, Okla. (See 
table 19-B for authorizing legislation.) Information on 
this project follows: 
ROBERT S. KERR MARINE TERMINAL 
Location. Five miles south of Sallisaw, Okla., on the 
left side of Robert S. Kerr Lock and Dam and 
Reservoir. 
Existing project. Consists of wharf, office and storage 
building, storage space, and operating areas for 
servicing of floating plant and storage of machinery, 
equipment, and supplies to maintain the navigation 
facilities. Estimated cost is $2,340,000 excluding costs 
of facilities to be provided for the US Coast Guard on a 
reimbursable basis. 
Local cooperation. See requirement for entire project. 
Operation and results during fiscal year. Construction of 
terminal facilities was completed. Construction of 
water supply, turfing, and permanent operating 
equipment was initiated. 
575

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end of fiscal year. Construction began May 
1967 and is 86 percent complete. 
5. OTHER AUTHORIZED NAVIGATION 
PROJECT. 
Red River from Fulton, Ark. to mouth of Washita 
River. For description of completed improvement and 
authorization see Annual Report for 1924. Cost for 
construction was $378,574 and operation and maintenance 
$182,157. Curtailment of project is recommended 
in H. Doc. 947, 64th Cong., 1st Sess. 
FLOOD CONTROL 
6. ARKANSAS-RED RIVER CHLORIDE 
CONTROL, TEX., OKLA., AND KANS. 
Location. On certain tributary streams of Arkansas 
and Red Rivers in the western half of Tulsa District. 
Existing project. Provides for construction of two 
experimental water quality study projects, supplemental 
planning studies of the Great Salt Plains 
area on Salt Fork of the Arkansas River and along 
Jonah Creek of Red River, and construction of lowflow 
dams, pipelines, and two brine storage reservoirs 
in the Wichita River Watershed. (See table 19-B for 
authorizing legislation.) Project features on which 
preconstruction planning, construction or maintenance, 
and operation has been initiated are reported 
separately in this section. 
6A. EXPERIMENTAL WATER QUALITY 
STUDY PROJECTS, RED RIVER 
BASIN, TEX. 
Location. Part of project is on Prairie Dog Town Fork 
of Red River, in Hall County, about 0.5 mile east of 
Estelline, Tex., and part of project is in South Wichita 
River Watershed in King County, about 6 miles east of 
Guthrie, Tex. (See Army Map Service maps for 
Plainview and Lubbock, Tex.) 
Existing project. Experimental structures to determine 
feasibility of controlling and abating chloride flows by 
applying a counter balancing, hydrostatic head on two 
brine springs. Structures consist of an earthen dike and 
a weir around a large spring near Estelline, Tex., and a 
concrete plug, pipe and weir at one of several salt 
springs near Guthrie, Tex. Project will include instrumentation 
and performance of tests to determine 
effectiveness of construction work. Federal cost is $300, 
028. (See table 19-B for authorizing legislation.) 
Local cooperation. None required. 
Operations and results during fiscal year. Operation of 
project near Guthrie, Tex., was discontinued in 1966. 
Structure near Estelline, Tex., was operated and 
maintained in a serviceable condition. 
Condition at end of fiscal year. Structure near Estelline, 
Tex., was completed in 1966 and placed in permanent 
operation. 
6B. ARK-RED CHLORIDE CONTROL, 
SUPPLEMENTAL STUDIES, OKLA. 
Location. On Salt Fork of Arkansas River about 12 
miles east of Cherokee, Alfalfa County, Okla. (See 
sectional aeronautical chart, Wichita sheet, scale 
1:500,000.) Also, on Jonah Creek of Red River about 
12 miles northwest of Childress, Childress County, Tex. 
(See Geological Survey map Estelline 1961, quadrangle 
scale 1:62,500.) 
Existing project. Provides for field investigations 
required to fully substantiate the effectiveness of 
proposed chloride control structures including a fresh 
water impoundment dike at Great Salt Plains on Salt 
Fork of the Arkansas River and a brine collection 
system, evaporation pond, and deep well injection tests 
on Jonah Creek of Red River. Additional water quality 
monitoring stations in the two basins together with field 
tests are required to develop engineering data needed 
for selection and design of efficient control plans. 
Estimated cost is $2,500,000. 
Local cooperation. None required. 
Operations and results during fiscalyear. In the Great Salt 
Plains, Okla. area, a network of 150 ground water wells 
were installed to measure fluctuations in ground water 
levels and to grab samples of the ground water. Lake 
traverses measuring conductivity and temperature 
were conducted three times during FY 70 to estimate 
the location of springs beneath the existing reservoir. 
The facilities for the impoundment dike test were 
constructed during FY 70. They consisted of a low dam 
and pump station on the Salt Fork of the Arkansas 
River for pumping flows to the impoundment dike out 
on the salt plains, the impoundment dike and an 
automated data collection system. The USDA agencies, 
the Agricultural Research Service, and the 
Soil Conservation Service started work on the effects of 
saline ground water on agriculture production in the 
area. At the Jonah Creek, Tex. area, piezometers were 
set in the reach of the creek near the collection system 
site, and the well site and collection system site were 
selected, surveyed, and core drilled. Evaporation 
studies will be conducted by the Ada, Okla., office of 
the FWQA at the Jonah Creek test site. 
Condition at end of fiscal year. Investigations began in 
January 1968 and is 76 percent complete. 
6C. ARK-RED CHLORIDE CONTROL, 
PART I, TEX. 
Location. On headwater tributaries of Wichita River 
in King, Knox, Foard, and Cottle Counties, and on the 
Canal Creek tributary of Pease River, Foard County, 
Tex. 
Existing project. Provides for a system of three low-flow 
dams with attendant pumping and pipeline facilities 
discharging into two off-channel brine storage reservoirs. 
Each low-flow dam will be equipped with an 
inflatable fabric-type weir located in the spillway 
section which would be deflated to pass relatively good 
quality high flows downstream. Total estimated 
Federal cost is $64,800,000. (See table 19-D on Part I, 
Wichita River Control Plan, Tex.) 
Local cooperation. None required. 
576

TULSA, OKLA., DISTRICT 
Operations and results during fiscal year. Engineering 
studies required for preconstruction planning continued. 
Condition at end of fiscal year. Preconstruction planning 
was 25 percent complete. 
7. BIG HILL LAKE, VERDIGRIS RIVER 
BASIN, KANS. 
Location. On Big Hill Creek, river mile 33.3, about 5 
miles east of Cherryvale, Kans. (See Geological Survey 
map for Independence, Kans., quadrangle, scale 1:125, 
000.) 
Existing project. Provides for an earthfill dam about 4, 
175 feet long and 75 feet above streambed. A 200-foot 
uncontrolled spillway would be located 600 feet east of 
the embankment. Outlet works will include a drop 
inlet intake structure, a 6-foot-diameter conduit and a 
stilling basin. An 18-inch-diameter pipe will be 
provided for water supply releases. Reservoir will have 
a total capacity of 23,900 acre-feet, (12,700 for flood 
control and 11,200 for conservation and sedimentation 
reserve). Reservoir will control runoff from a drainage 
area of 37 square miles, and will be operated as a unit 
of a five-reservoir system for flood control in Verdigris 
River Basin in Kansas, with a two-reservoir system in 
Verdigris River Basin in Oklahoma. Estimated cost is 
$5,840,000. (See table 19-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, and Water Supply Act of 1958, as amended, 
apply. 
Operations and results during fiscal year. Engineering 
studies continued. 
Condition at end offiscalyear. Preconstruction planning 
is complete. 
8. CANDY LAKE, VERDIGRIS RIVER 
BASIN, OKLA. 
Location. On Candy Creek, river mile 1.0, a tributary 
of Bird Creek in Verdigris River Basin. Damsite is 
about 1 mile northeast of Avant, Osage County, Okla. 
(See Geological Survey maps, Pawhuska and Hominy, 
Okla., quadrangles, scale 1:62,500 and Army Map 
Service, Enid, Okla., map, scale 1:250,000.) 
Existing project. Plan of improvement provides for an 
earthfill dam about 3,885 feet long, including an 
uncontrolled concrete spillway. Dam will be constructed 
to a height of 105 feet above streambed. Outlet 
works will consist of a gated intake structure, a 6.5-foot 
conduit, and a stilling basin. A 24-inch low-flow pipe 
and a 24-inch water supply pipe will be provided. 
Reservoir will have a total capacity of 36,500 acre-feet 
with 13,400 acre-feet in conservation pool and 23,100 
acre-feet reserved for flood control storage. Reservoir 
will control drainage of 50 square miles, and will be 
operated as a unit in a five-reservoir system for flood 
control in Verdigris River Basin in Oklahoma. 
Estimated cost of project is $7,210,000. (See table 19-B 
for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938 
and section 301, Water Supply Act of 1958 apply. 
Operations and results during fiscal year. Preconstruction 
planning continued. 
Condition at end of fiscal year. Preconstruction planning 
is 78 percent complete. 
9. CANTON LAKE, ARKANSAS RIVER 
BASIN, OKLA. 
Location. On North Canadian River about 394 miles 
above its mouth and about 2 miles north of Canton, 
Blaine County, Okla. (See sectional aeronautical 
chart, Wichita sheet, scale 1:500,000.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Estimated Federal cost is $11,126,000. 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. A total of 48,480 
acre-feet was released from reservoir for water supply. 
Two noteworthy rises occurred above the reservoir. 
Flooding was prevented on an average of about 500 
acres of land. Estimated monetary benefits attributed 
to Canton Lake operations for prevention of flood 
damages total $5,019,000 to June 30, 1970. (See table 
19-E on pool elevations and storage during fiscal year.) 
Condition at end of fiscal year. Construction of dam was 
initiated in December 1940, impoundment began 
April 1948, and project was completed in December 
1953. Work required to complete the project consists of 
additional recreational facilities. 
10. CHERRY AND RED FORK CREEKS, 
OKLA. 
Location. Minor tributaries in Arkansas River Basin 
at Tulsa, Tulsa County, Okla. (See Geological Survey 
maps Tulsa, Sand Springs, Sapulpa, andJenks, Okla., 
quadrangles, scale 1:24,000). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual 
Report for 1969. Federal cost is $261,000. 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Construction of 
channel improvements was completed. 
Condition at end of fiscal year. Construction began May 
1968 and was completed and accepted by local 
interests November 1969. 
11. CLAYTON LAKE, RED RIVER BASIN, 
OKLA. 
Location. On Jackfork Creek, river mile 2.8, a 
tributary of Kiamichi River, about 2.5 miles north of 
Clayton, Pushmataha County, Okla., (See Geological 
577

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Survey map, Tuskahoma, Okla., quadrangle, and 
Army Map Service map, McAlester, Okla.). 
Existing project. Provides for an earthfill dam about 
13,630 feet long, including spillway, rising 97 feet 
above streambed. An uncontrolled spillway 200 feet 
wide will be constructed near right abutment. Outlet 
works will consist of a gate controlled conduit, 11 feet in 
diameter, and two 24-inch pipes will be installed; one 
for low-flow regulation and theother for a water supply 
outlet. Reservoir will provide 104,000 acre-feet of 
storage for flood control and 186,500 acre-feet for 
conservation and sediment reserve, a total of 290,500 
acre-feet. Project will control a drainage area of 275 
square miles. Reservoir will be operated as a unit in a 
two-reservoir system for flood control in upper Kiamichi 
River Basin, thereby reducing Red River 
floodflows. Estimated cost of project is $18,700,000. 
(See table 19-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938 
and Water Supply Act of 1958 as amended, apply. 
Operations and results during fiscal year. Preconstruction 
planning continued. 
Condition at end offiscalyear. Preconstruction planning 
is 38 percent complete. 
12. COPAN LAKE, VERDIGRIS RIVER 
BASIN, OKLA. 
Location. On Little Caney River, river mile 7.4, a 
tributary of Caney River in Verdigris River watershed, 
about 2 miles west of Copan, Washington County, 
Okla. (See Geological Survey Maps of Nowata, Okla., 
and Sedan and Independence, Kans., quadrangles, 
scale 1:125,000 and Army Map Service maps, Tulsa 
Okla., and Wichita and Joplin, Kans., scale 1:250, 
000.) 
Existing project. Provides for an earthfill dam 7,715 feet 
long, including a gated spillway section, and a levee 17, 
100 feet long, for protection of Caney, Kansas. 
Maximum height above streambed will be 70 feet. A 
concrete spillway, controlled by four 50- by 35.5-foot 
tainter gates, will provide for operation of reservoir for 
flood control. Outlet works will include a 36-inch lowflow 
pipe and a 12-inch future water supply pipe. A 
total reservoir capacity of 227,700 acre-feet will be 
provided (43,400 for conservation and 184,300 for 
storage for floodwaters). Drainage area above damsite 
is 505 square miles. Reservoir will be operated as a unit 
in a five-reservoir system for flood control in Verdigris 
River Basin in Oklahoma. Relocated Oklahoma State 
Highway 10 will cross dam. Estimated cost of project is 
$45,200,000. (See table 19-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, and section 301, Water Supply Act of 1958, 
apply. 
Operations and results during fiscal year. Engineering 
studies required prior to advertising construction 
contracts continued. 
Condition at end of fiscal year. Preconstruction planning 
is complete. 
13. COUNCIL GROVE LAKE, GRAND 
(NEOSHO) RIVER BASIN, KANS. 
Location. On Grand (Neosho) River about 450 miles 
above mouth and about 2.5 miles northwest of Council 
Grove, Morris County, Kans. (See Geological Survey 
maps for Parkerville and Eskridge, Kans., quadrangles, 
scale 1:125,000.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Estimated Federal cost is $11,688,000. 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. During low-flow 
water periods, releases totaling 1,966 acre-feet were 
made from reservoir to supplement municipal water 
supply for downstream towns and other usages. Seven 
noteworthy rises occurred on Grand (Neosho) River 
above reservoir. Operation of reservoir prevented 
downstream flooding on an average of 3,500 acres of 
land. Estimated monetary benefits attributed to 
Council Grove Lake operations for prevention of flood 
damages total $943,000 to June 30, 1970. (See table 19- 
E for pool elevations and storages during fiscal year.) 
Condition at end of fiscal year. Construction initiated 
July 1960 and impoundment began October 9, 1964, 
placing project in full flood control operation. Work 
required to complete the project consists of additional 
recreational facilities. 
14. COW CREEK, KANS. 
Location. A tributary of Arkansas River in Rice and 
Reno Counties, Kans. (See Geological Survey maps for 
Lyons, Hutchinson, and Yagger, Kans., quadrangles 
and Army Map Service maps for Hutchinson and 
Great Bend, Kans., scale 1:250,000.) 
Existing project. Straighten, snag, clear, and deepen 
15.5 miles of existing channel, starting at a point south 
of Lyons, Kans., and extending downstream to existing 
Hutchinson local protection project. Estimated Federal 
cost is $2,950,000 and estimated non-Federal is $890, 
000. (See table 19-B for authorizing legislation.) 
Local cooperation. Local interests must provide lands, 
easements, and rights-of-way; hold the United States 
free from damages; provide necessary alterations of 
highways, bridges, and utilities, except for railroads; 
maintain and operate project after completion; prevent 
encroachment on improved channel; and inform 
affected interests, at least annually, that project will not 
provide complete protection against major floods. 
Operations and results during fiscal year. Engineering 
studies continued. 
578

TULSA, OKLA., DISTRICT 
Condition at end offiscalyear. Preconstruction planning 17. DIERKS LAKE, RED RIVER BASIN, 
is complete. ARK. 
15. CRUTCHO CREEK, OKLA. 
Location. Tributary ,of North Candian River in 
Oklahoma City, Midwest City, and Dell City, Oklahoma 
County, Okla. (See Geological Survey maps 
Midwest City, Choctaw, and Spencer, Okla., quadrangles, 
scale 1:24,000). 
Existing project. Plan is to enlarge and straighten 
about 5 miles of channel, construct a diversion channel 
7,000 feet long, and clear and snag about 2 miles of old 
channel. Estimated Federal cost is $4,540,000 and 
estimated non-Federal cost is $775,000. (See table 19-B 
for authorizing legislation.) 
Local cooperation. Local interest must provide lands, 
easements, and rights-of-way; hold the United States 
free from damages; maintain and operate completed 
project; perform all relocations, except railroads; 
prevent encroachment on existing and improved 
channel and inform affected interests annually of 
possible flows exceeding channel capacity. 
Operations and results during fiscal year. Engineering 
studies continued. 
Condition at end offiscalyear. Preconstruction planning 
is complete. 
16. DEQUEEN LAKE, RED RIVER BASIN, 
ARK. 
Location. On Rolling Fork River, river mile 22.8, a 
tributary of Little River, in Sevier County, about 4 
miles northwest of DeQueen, Ark. (See Geological 
Survey map, DeQueen, Ark., quadrangle, and Army 
Map Services map, McAlester, Okla., scale 1:250,000.) 
Existing project. Plan is an earthfill dam, 2,360 feet 
long, constructed to 160 feet above streambed. Uncontrolled 
spillway, 200 feet wide, will be about 1,400 
feet east of main embankment. Reservoir will control 
169 square miles of drainage area and provide a total 
storage of 136,100 acre-feet (101,200 for flood control 
storage and 34,900 for conservation and sedimentation 
reserve.) Outlet works consists of a gated conduit, 12 
feet in diameter. Reservoir will be operated as a unit in 
a seven-reservoir system for flood control in Little River 
Watershed, thereby reducing Red River floodflows. 
Estimated cost of project is $12,100,000. (See table 19- 
B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938, 
and section 301, Water Supply Act of 1958, as 
amended, apply. 
Operations and results during fiscal year. Construction of 
outlet works, project buildings, initial clearing, and 
access roads is complete. Acquisition of lands and 
engineering studies continued. Relocation of county 
roads was initiated. 
Condition at end offiscalyear. Construction began April 
1966 and is about 40 percent complete. 
Location. On Saline River, river mile 56.6, a tributary 
of Little River, about 5 miles northwest of Dierks, 
Howard County, Ark. (See Geological Survey map, 
DeQueen, Ark., quadrangle, and Army Map Services 
map, McAlester, Okla., scale 1:250,000.) 
Existing project. Plan is an earthfill dam 2,760 feet 
long and about 153 feet above streambed. An uncontrolled 
spillway 800 feet wide will be in a saddle at 
west end of dam. Outlet works consisting of a gated 6- 
by 9-foot oblong conduit, one 24-inch low flow pipe 
and one 30-inch water supply pipe will be provided. 
Reservoir will control a drainage area of 114 square 
miles and provide for storage of 67,100 acre-feet for 
flood control and 29,700 acre-feet for water supply, 
conservation, and sediment reserve, a total of 96,800 
acre-feet. Reservoir will be operated as a unit in a 
seven-reservoir system for flood control in Little River 
Watershed, there reducing Red River floodflows 
Estimated cost of project is $14,300,000. (See table 19- 
B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938, 
and section 301, Water Supply Act of 1958, as 
amended, apply. 
Operations and results during fiscal year. Acquisition of 
land and engineering studies continued. Construction 
continued on left abutment access road. Construction 
initiated on embankment, outlet works, spillway, and 
project buildings. 
Condition at end of fiscal year. Construction began June 
1968 and is 17 percent complete. 
18. EL DORADO LAKE, ARKANSAS 
RIVER BASIN, KANS. 
Location. On Walnut River, river mile 100.2, a 
tributary of Arkansas River, about 2 miles northeast of 
El Dorado, Butler County, Kans. (See Geological maps 
of El Dorado and De Graff, Kans., quadrangle, scale 
1:24,000.) 
Existing project. Provides for an earthfill dam 9,650 
feet long, including a gated spillway 136 feet long with 
three 40-foot-wide by 35-foot-high tainter gates. Dam 
will be 88 feet above streambed. Reservoir will control 
235 square miles of drainage area and provide a total 
storage of 167,500 acre-feet (75,200 for flood control 
storage and 92,300 for conservation uses). Outlet works 
will consist of a 24-inch low-flow pipe and a 24-inch 
water supply pipe. Reservoir will be operated as a unit 
in a three-reservoir system for flood control in the 
Walnut River Basin. Estimated cost of project is $30, 
800,000. (See table 19-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938 
and Water Supply Act of 1958 as amended, apply. 
Operations and results during fiscal year. Preconstruction 
planning continued. 
579

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end offiscalyear. Preconstruction planning 
is complete. 
19. ELK CITY LAKE, ARKANSAS RIVER 
BASIN, KANS. 
Location. On Elk River, river mile 8.7, about 7 miles 
northwest of Independence, Montgomery County, 
Kans. (See Geological Survey maps for Caney-NE., 
NW., and SW. and Benton, Kans., quadrangles, scale 
1:24,000.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Federal cost was $19,043,000. 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. During low-flow 
water periods, releases totaling 444 acre-feet were 
made from reservoir to supplement municipal water 
supply for downstream towns and other usages. Five 
noteworthy rises occurred above the reservoir. Flooding 
was prevented on an average of about 1,600 acres of 
land. Estimated monetary benefits attributed to Elk 
City Lake for prevention of flood damages total $1,445, 
000 to June 30, 1970. (See table 19-E for pool elevations 
and storages during fiscal year.) 
Condition at end of fiscal year. Construction began in 
February 1962 and project placed in full operational 
status in March 1966. 
20. FALL RIVER LAKE, ARKANSAS 
RIVER BASIN, KANS. 
Location. On Fall River about 54 miles above its 
confluence with Verdigris River and about 4 miles 
northwest of Fall River, Greenwood County, Kans. 
(See Geological Survey map for Eureka, Kans., 
quadrangle, scale 1:125,000; and Severy, Kans., 
quadrangle scale 1:62,500.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Federal cost was $10,494,413. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. Five noteworthy 
rises occurred above the reservoir. Flooding was 
prevented on an average of 17,900 acres of land. 
During low-flow water periods, releases totaling 684 
acre-feet were made from reservoir to supplement 
municipal water supply for downstream towns and 
other usages. Estimated monetary benefits attributed to 
Fall River Lake operations for prevention of flood 
damages total $11,004,000 to June 30, 1970. (See table 
19-E for pool elevations and storages during fiscal 
year.) 
Condition at end of fiscal year. Construction of dam was 
started May 1946 and completed May 1949. Project 
placed in full operation in April 1949. 
21. FORT SUPPLY LAKE, NORTH 
CANADIAN RIVER, OKLA. 
Location. On Wolf Creek, river mile 5.5, a tributary of 
North Canadian River, about 12 miles northwest of 
Woodward, Woodward County, Okla. (See sectional 
aeronautical chart, Wichita sheet, scale 1:500,000.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Estimated Federal cost is $7,706,000. 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. One noteworthy 
rise occurred above the reservoir. Flooding was 
negligible. A total of 202 acre-feet was made available 
from reservoir for water supply. Estimated monetary 
benefits attributed to Fort Supply Lake operations for 
prevention of flood damages total $2,305,000 to June 
30, 1970. (See table 19-E for pool elevations and 
storages during fiscal year.) 
Condition at end of fiscal year. Construction work on 
dam was started October 1938, and project placed in 
full operation May 1942. 
22. GILLHAM LAKE, RED RIVER BASIN, 
ARK. 
Location. Damsite is on Cossatot River, river mile 
49.0, in Howard County, about 5 miles northeast of 
Gillham, Sevier County, Ark. (See Geological Survey 
Map, DeQueen, Ark.-Okla. quadrangle, scale 1:125, 
000; and Atimony, Gillham NE, Vandervoort and 
Empire, Ark., quadrangles, scale 1:24,000.) 
Existing project. Plan provides for a modified rockfill 
dam about 2,850 feet long, (including spillway and 
dike), 160 feet above streambed. Gated controlled 
spillway, 240 feet gross width, is in a saddle immediately 
west of dam. The spillway has four 50- by 42- 
foot tainter gates. Outlet works consists of a 10-footdiameter 
concrete-lined tunnel controlled by two 4.5- 
by 10-foot slide gates and a stilling basin, a 24-inch 
supply pipe and a 30-inch low-flow pipe. Reservoir will 
provide a total storage of 221,800 acre-feet (188,700 for 
flood control, 33,100 for conservation storage and 
sedimentation reserve) and will control a drainage area 
of 271 square miles. Project will be operated as a unit in 
a seven-reservoir system for flood control in Little River 
Watershed, thereby reducing Red River floodflows. 
Estimated cost of project is $15,300,000. (See table 19- 
B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, and of Water Supply Act of 1958, as 
amended, apply. Tri-Lakes Water District furnished a 
resolution of intent to repay costs allocated to water 
supply storage. 
Operations and results during fiscal year. Construction of 
spillway and dikes, right access road, Howard County 
roads, project buildings, outlet works, and land 
acquisition is complete. Engineering studies continued. 
580

TULSA, OKLA., DISTRICT 
Condition at end of fiscal year. Construction began June 
1963 and is 62 percent complete. 
23. GREAT SALT PLAINS LAKE, SALT 
FORK OF ARKANSAS RIVER, OKLA. 
Location. On Salt Fork of Arkansas River, river mile 
103.3, about 12 miles east of Cherokee, Alfalfa County, 
Okla. (See sectional aeronautical chart, Wichita sheet, 
scale 1:500,000.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Federal cost was $4,626,270. 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. One noteworthy 
rise occurred above the reservoir. Flooding was 
prevented on an average of about 13,300 acres of land. 
Estimated monetary benefits attributed to Great Salt 
Plains Lake operations for prevention of flood damages 
total $5,636,000 to June 30, 1970. (See table 19-E for 
pool elevations and storages during fiscal year.) 
Condition at end of fiscal year. Construction of dam was 
initiated September 1938 and completed July 1941. 
Project placed in full flood control regulation in May 
1941. 
24. HUGO LAKE, KIAMICHI RIVER, 
OKLA. 
Location. On Kiamichi River, river mile 17.6, about 7 
miles east of Hugo, Choctaw County, Okla. (See 
Geological Survey map for Alikchi, Okla, quadrangle, 
scale 1:125,000.) 
Existing project. Provides for an earthfill dam and 
gated concrete spillway about 10,200 feet long, 101 feet 
above streambed. Spillway and outlet works will be 
combined in a concrete structure in flood plain near 
center of dam. The concrete structure will consist of six 
40- by 50-foot tainter gates, a 48-inch low-flow pipe 
and a 48-inch water supply pipe. Reservoir will have a 
total capacity of 959,800 acre-feet, with initial allocation 
of 808,300 for flood control and 151,500 for 
conservation and sediment reserve and will control 
runoff from 1,709 square miles. Reservoir will be 
operated as a unit in a coordinated reservoir system for 
flood control in Kiamichi River and Red River 
Valleys. Estimated cost is $35,000,000. (See table 19-B 
for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938, 
and Water Supply Act of 1958, as amended, apply. 
State of Oklahoma through its Water Resources Board 
and local interests furnished resolutions of intent to 
repay costs allocated to water supply storage. 
Operations and results during fiscal year. Construction of 
right abutment access road and project buildings 
completed. Engineering studies and acquisition of land 
continued. Construction continued on spillway, embankment, 
and left access road. 
Condition at end of fiscal year. Construction began 
October 1967 and project is 33 percent complete. 
25. HULAH LAKE, CANEY RIVER, OKLA. 
Location. On Caney River, river mile 96.2, about 15 
miles northwest of Bartlesville, near Hulah, Osage 
County, Okla. (See Geological Survey maps for 
Pawhuska, Okla., and Sedan, Kans., quadrangles, 
scale 1:125,000.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Estimated Federal cost is $11,436,000. 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. Six noteworthy 
rises occurred above reservoir. Flooding was prevented 
on an average of about 28,600 acres of land. Estimated 
monetary benefits attributed to Hulah Lake operations 
for prevention of flood damages total $19,705,000 to 
June 30, 1970. During low-water periods, releases 
totaling 1,490 acre-feet were made from the reservoir to 
supplement municipal water supply for downstream 
towns and for other usages. A total of 3,680 acre-feet of 
impounded water was withdrawn from reservoir by city 
of Bartlesville, Okla., Oil Recovery Corp., and Shallow 
Water Refining Co. (See table 19-E for pool elevations 
and storages during fiscal year.) 
Condition at end of fiscal year. Project was started in 
May 1946 and completed in June 1950. Project placed 
in full flood control operation in September 1951. 
Project is complete except for recreational facilities. 
26. JOHN REDMOND DAM AND 
RESERVOIR, GRAND (NEOSHO) 
RIVER BASIN, KANS. 
Location. Dam is on Grand (Neosho) River, river mile 
343.7, about 2 miles northwest of Burlington, Coffey 
County, Kans. (See Geological Survey maps for 
Burlington and Emporia, Kans., quadrangles, scale 
1:125,000.) 
Existing project. An earthfill dam and gated concrete 
spillway. Total length of structure including embankment, 
spillway and bulkheads is 21,677 feet and 
height is 86.5 feet above streambed. The ogee-weir 
spillway consists of fourteen 40- by 35-foot tainter 
gates. Outlet works consists of two 24-inch-diameter 
low-flow pipes and a 30-inch water supply connection 
for future use. A 24-inch road crosses the dam. 
Reservoir has a total capacity of 644,600 acre-feet, of 
which 562,500 acre-feet is for flood control and 82,100 
acre-feet for water supply, pollution abatement, 
sediment reserve, recreation, and preservation of fish 
and wildlife. Reservoir controls a total drainage area of 
3,015 square miles. Reservoir operated as a unit in a 
four-reservoir system for flood control in Grand 
(Neosho) River and tributaries above Pensacola Lake. 
Estimated cost is $29,389,000, which includes $1,090, 
581

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
000 for wildlife refuge and $318,000 for additional 
recreational facilities. (See table 19-B for authorizing 
legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938 
and Water Supply Act of 1958, as amended, apply. 
Through its State Water Resources Board, the State of 
Kansas furnished a resolution requesting minimum 
provision of 34,900 acre-feet of water-supply storage in 
reservoir. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. Construction of 
additional recreational facilities continued. Eight 
noteworthy rises occurred above the reservoir. Flooding 
was prevented on an average of 24,100 acres of land. 
Estimated monetary benefits attributed to reservoir 
operations for prevention of flood damages total $7, 
812,000 to June 30, 1970. (See table 19-E for pool 
elevations and storages during fiscal year.) 
Condition at end of fiscal year. Construction was initiated 
in July 1959 and completed in December 1965. Project 
placed in flood control operation in July 1964 and is 
complete except for additional recreational facilities 
and acquisition of additional lands for wildlife refuge. 
27. KAW LAKE, ARKANSAS RIVER, 
OKLA. 
Location. On Arkansas River, river mile 653.7, about 
8 miles east of Ponca City, Kay County, Okla. (See 
Geological Survey maps for Kaw, Foraker, and 
Belford, Okla., quadrangles, scale 1:250,000.) 
Existing project. Plan is for an earthfill dam about 9, 
140 feet long, 129 feet above streambed, with a gatecontrolled 
spillway. One 3.5- by 4-foot sluice through 
spillway section will provide for low-flow regulation 
and a 48-inch-diameter water supply pipe will be 
installed through dam. Flow over spillway will be 
control by eight 50- by 47-foot tainter gates. A 24-foot 
bituminous-surfaced road crosses the embankment. 
Reservoir will have a total storage capacity of 1,285, 
000 acre-feet (824,000 for flood control and 461,000 for 
conservation and sedimentation). Future powerhouse 
will provide for installation of one generating unit of 
25,000 kilowatts if feasible. Drainage area above 
reservoir contains 46,530 square miles and will control 
runoff from a normal contributing area of 7,250 square 
miles. Kaw Lake will be operated as unit of coordinated 
reservoir system for flood control in Arkansas 
River Basin. Estimated cost is $109,000,000. (See table 
19-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938, 
and section 301, Water Supply Act of 1958 apply. 
Operations and results during fiscal year. Construction 
continued on diversion channel and first stage embankment. 
Engineering studies and land acquisition 
continued. Relocation of Kaw city municipal facilities 
continued. Construction of project buildings, overlook, 
and right access road is complete. 
Condition at end of fiscal year. Project construction 
began in June 1966 and is about 13 percent complete. 
28. LAKE KEMP, WICHITA RIVER, TEX. 
Location On Wichita River, river mile 126.7, about 40 
miles southwest of Wichita Falls, Tex. (See aeronautical 
chart, Dallas, scale 1:500,00 and Army 
Map Service map, Wichita Falls, Tex., scale 1:250, 
000.) 
Existing project. Plan is to reconstruct and expand 
existing non-Federal reservoir by raising dam 16 feet 
and providing a new spillway and outlet works. The 
dam will be above 8,890 feet long and 115 feet above 
streambed. Reconstructed project will have a total 
storage of 524,200 acre-feet (225,300 for flood control 
and 298,900 for conservation and sediment reserve). 
Existing spillway will be abandoned and blocked off by 
improved embankment, and a new uncontrolled 
spillway will be constructed near the right abutment. 
New outlet works will consists of two 5-foot-8-inch by 
13-foot hydraulic-operated slide gates, a 13-foot-diameter 
conduit, a stilling basin, and a 6-inch low-flow 
pipe. Drainage area above damsite is 2,086 square 
miles. Lake Kemp will be operated as unit of 
coordinated reservoir system for flood control in 
Wichita River and Red River Basins. Estimated 
Federal cost is $7,800,000 and estimated non-Federal 
cost is $3,130,000. (See table 19-B for authorizing 
legislation.) 
Local cooperation. Local interests will continue to 
operate and maintain entire project; operate flood 
control features; relocate and alter existing buildings, 
highways, bridges, sewers, and special facilities; hold 
the United States free from damages; provide lands for 
construction and operation; preserve existing capacity 
of channel through city of Wichita Falls; and reimburse 
the United States for cost of reconstruction 
allocated to conservation storage. 
Operations and results during fiscal year. Engineering 
studies continued. Construction of embankment, outlet 
works, and spillway was initiated. 
Condition at end of fiscal year. Project is about 12 percent 
complete. 
29. LUKFATA LAKE, RED RIVER BASIN, 
OKLA. 
Location. On Glover Creek at mile 17.3, about 6.5 
miles north of Glover, McCurtain County, Okla. (See 
Geological Survey map, Lukfata, Okla., quadrangle, 
scale 1:125,000; and Bethel, Smithville, Golden and 
Broken Bow, Okla., quadrangles, scale 1:62,500.) 
Existing project. Plan provides for a rockfill dam about 
1,525 feet long, and 218 feet above streambed. 
Uncontrolled 420-foot saddle spillway, will be about 1, 
000 feet southeast of dam. Outlet works will consists of 
a 10-foot conduit and a stilling basin. Reservoir will 
provide a total storage of 218,000 acre-feet (171,100 for 
582

TULSA, OKLA., DISTRICT 
flood control, 39,400 for conservation, and 7,500 for 
sedimentation reserve) and will control a drainage area 
of 291 square miles. Project will be operated as a unit in 
a seven-reservoir system for flood control in Little River 
Watershed, thereby reducing Red River floodflows. 
Estimated cost of project is $15,800,000. (See table 19- 
B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938, 
and Water Supply Act of 1958 as amended, apply. 
Operations and results during fiscal year. Engineering 
studies and investigations continued. 
Condition at end offiscalyear. Preconstruction planning 
is complete. 
30. MARION LAKE, GRAND (NEOSHO) 
RIVER BASIN, KANS. 
Location. On Cottonwood River, river mile 126.7, 
about 3 miles northwest of Marion, Marion County, 
Kans. (See Geological Survey map, Newton, Kans., 
quadrangle, scale 1:125,000.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Estimated cost of project is $13,948,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. During low-flow 
water periods, releases totaling 2,075 acre-feet were 
made from reservoir to supplement municipal water 
supply for downstream towns and other uses. Six 
noteworthy rises occurred above the reservoir. Flooding 
was prevented on an average of about 2,000 acres of 
land. Estimated monetary benefits attributed to 
reservoir operations for prevention of flood damages 
total $502,000 to June 30, 1970. (See table 19-E for 
pool elevations and storages during fiscal year.) 
Condition at end of fiscal year. Construction began in 
June 1964 and the project placed in flood control 
operation February 1968. 
31. MILLWOOD LAKE, RED RIVER 
BASIN, ARK. 
Location. On Little River, river mile 16.0, approximately 
7 miles east of Ashdown, Little River 
County, Ark., and about 2 miles northeast of Millwood, 
Little River County, Ark. (See Geological maps NI-8 
and 15-4 for El Dorado, Ark., and McAlester, Okla., 
quadrangle, scale, 1:250,000.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Estimated cost of project is $44,639,000. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, and Water Supply Act of 1958, as amended, 
apply. Southwest Arkansas Water District entered into 
a contract to reimburse the United States for cost 
allocated to water supply storage and facilities. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. During low-water 
periods releases totaling 12,400 acre-feet were made 
from the reservoir to supplement water supply for 
downstream towns and other usages. Three noteworthy 
rises occurred above the reservoir. Flooding was 
prevented on an average of 2,500 acres of land. A total 
of 24,800 acre-feet was released from reservoir for water 
supply by Southwest Arkansas Water District. Estimated 
monetary benefits attributed to reservoir 
operations for prevention of flood damages total $481, 
000 to June 30, 1970. (See table 19-E for pool elevations 
and storages during fiscal year.) 
Condition at end offiscalyear. Construction was initiated 
in September 1961. Project was placed in flood control 
operation in June 1965 and in full operational status 
during August 1966. Work required to complete 
project consists of additional recreational facilities. 
32. OOLOGAH LAKE, ARKANSAS RIVER 
BASIN, OKLA. 
Location. On Verdigris River about 10 miles northwest 
of Claremore, Rogers County, Okla., and about 
two miles southeast of Oologah, Rogers County, Okla. 
(See Geological Survey maps for Claremore and 
Nowata, Okla., quadrangles, scale 1:125,000.) 
Existing project. Earthfill dam is about 4,000 feet long 
and 137 feet above streambed. Reservoir as initially 
operated, provides 963,000 acre-feet for flood control 
storage, 48,700 acre-feet for water supply, and 9,300 
acre-feet for sedimentation reserve, a total of 1,021,000 
acre-feet. Ultimate development will provide a total 
capacity of 1,519,000 acre-feet (965,600 for flood 
control and 553,400 for conservation and sediment 
reserve). A roadway is located across crest of dam. Two 
gated concrete conduits extend through embankment 
to form outlet works. An off-channel uncontrolled 
saddle spillway about 2 miles east of left abutment 
provides for passage of floodwater into valley below 
dam. Reservoir controls a drainage area of 4,339 
square miles. Plan includes provisions for additional 
storage by addition of seven 40- by 21-foot radial gates 
to initially constructed spillway, a dike east of spillway, 
and additional reservoir clearing. Ultimate project is a 
unit in authorized Arkansas River navigation plan and 
a unit for flood control in Verdigris River Basin. 
Estimated cost is $46,200,000. (See table 19-B for 
authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938 
and section 301, Water Supply Act of 1958 apply. 
Under terms of existing water supply contracts, city of 
Tulsa, Okla., Public Service Co. of Okla., city of 
Collinsville, Okla., Claremore, Inc., Rural Water 
District No. 1, Nowata County, Okla., and Rural 
Water Districts Nos. 3 and 4, Rogers County, Okla., 
are now paying Treasury $17,300 annually for water 
supply storage rights in reservoir. 
583

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. Routine operation 
and maintenance continued. 4,141 acre-feet of 
water was released from reservoir for water supply. Five 
noteworthy rises occurred above reservoir. Flooding 
was prevented on an average of 25,400 acres of land. 
(See table 19-E for pool elevations and storages during 
fiscal year.) Estimated monetary benefits attributed to 
operation of partially completed reservoir for prevention 
of flood damages total $6,485,000 to June 30, 
1970. Engineering studies and acquisition of land 
continued. Reservoir clearing and plugging of oil and 
gas wells initiated. Construction of spillway was 
completed. 
Condition at end offiscalyear. After construction of right 
abutment access road, project was placed in standby 
status in October 1951. Construction was resumed in 
December 1955 and completed in May 1963 for initial 
development. Construction for utimate development 
was initiated July 1967. The project for ultimate 
development is about 57 percent complete. 
33. OPTIMA LAKE, NORTH CANADIAN 
RIVER, OKLA. 
Location. On North Canadian River, river mile 623.2, 
about 4.5 miles northeast of Hardesty, Texas County, 
Okla. (See sectional aeronautical chart, Wichita sheet, 
scale 1:500,000.) 
Existing project. Provides for flood control by construction 
of an earthfill dam and uncontrolled spillway 
with a total length of 15,200 feet and 120 feet above 
streambed. Reservoir provides for storage of 71,800 
acre-feet of water for flood control, 76,200 acre-feet for 
water supply, and 81,500 acre-feet for sedimentation 
reserve, making a total storage of 229,500 acre-feet. 
Reservoir will be used for recreational and wildlife 
preservation purposes. Outlet works will consist of a 13- 
foot cylindrical gated conduit, a 24-inch low-flow 
bypass and a 24-inch water supply pipe. Estimated cost 
is $30,700,000. (See table 19-B for authorizing legislation.) 
Present damsite is an alternate site about 15 
miles downstream from that considered in project 
document. Reservoir controls a drainage area of 5,029 
square miles. A roadway will be located across top of 
dam. Optima Lake will be operated as a unit of 
coordinated reservoir system for flood control in 
Arkansas River Basin. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies for flood control features. 
Operations and results during fiscal year. Project buidings 
and access roads are complete. Engineering studies and 
acquisition of land continued. Construction of outlet 
works initiated. 
Condition at end of fiscal year. Construction started 
March 1966 and is about 18 percent complete. 
34. PAT MAYSE LAKE, RED RIVER 
BASIN, TEX. 
Location. On Sanders Creek, mile 4.6, a tributary of 
Red River, about 12 miles north of Paris, Lamar 
County, Tex. (See Geological Survey map, Grant, 
Tex., quadrangle, scale 1:62,500 and Army Map 
Service Texarkana, Tex., map, scale 1:250,000.) 
Existing project. Provides for an earthfill dam about 7, 
080 feet long, excluding an uncontrolled spillway, 96 
feet above streambed. Outlet works consists of a drop 
inlet, a 7.25-foot-diameter conduit and a stilling basin. 
A 24-inch low-flow pipe and a 12-inch water supply 
pipe were installed in dam. Reservoir provides 64,600 
acre-feet for flood control, and 124,500 acre-feet for 
conservation and sedimentation, making a total of 189, 
100 acre-feet of storage. Channel from damsite to 
mouth of stream, about 2 miles, has been improved by 
clearing and snagging. Drainage area above dam is 175 
square miles. Reservoir operated as unit of coordinated 
reservoir system for flood control in Red River Basin 
and tributaries below Denison Dam. Estimated cost is 
$9,344,000. (See table 19-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938 
and section 301, Water Supply Act of 1958, apply. 
Contract for municipal and industrial water supply 
storage with city of Paris, Tex., for $31,284 has been 
approved. During FY 70, $10,175 paid to Treasury. 
Operations and results during fiscal year. All project 
structures were operated and maintained in a serviceable 
condition. Seven noteworthy rises occurred 
above the reservoir. Flooding was prevented on an 
average of 700 acres of land. Estimated monetary 
benefits attributed to reservoir operations for prevention 
of flood damages total $498,000 to June 30, 
1970. A total of 5,131 acre-feet was released from 
reservoir for water supply by city of Paris, Tex. (See 
table 19-G for pool elevations and storages during fiscal 
year.) 
Condition at end of fiscal year. Construction began in 
March 1965 and project was placed in operation 
September 1967. 
35. PINE CREEK LAKE, RED RIVER 
BASIN, OKLA. 
Location. On Little River, river mile 145.3, about 5 
miles northwest of Wright City, McCurtain County, 
Okla. (See Geological Survey map, Alikchi, Okla., 
quadrangle, scale 1:125,000; and Wright City and 
Pickens, Okla., quadrangles, NE, NW, SE, and SW, 
scale 1:24,000.) 
Existing project. An earthfill dam about 8,300 feet 
long, 124 feet above streambed. Controlled spillway is 
about 608 feet wide, and located at right abutment of 
dam. Spillway contains outlet works and nine bays for 
future tainter gates. Outlet works consists of a 13-foot 
conduit controlled by two 5-foot-8-inch by 13-foot slide 
gates, a 48-inch water supply bypass, and a 36-inch 
584

TULSA, OKLA., DISTRICT 
water supply static head line. Reservoir provides a total 
storage of 465,800 acre-feet (388,100 for flood control, 
70,500 for conservation, and 7,200 for sedimentation 
reserve) and controls a drainage area of 635 square 
miles. Project operated as unit in a seven-reservoir 
system for flood control in Little River Watershed, 
thereby reducing Red River floodflows. Estimated cost 
of project is $20,274,000. (See table 19-B for authorizing 
legislation.) 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, and title III, section 301, of Water Supply Act 
of 1958, apply. Mountain-Lakes Water District furnished 
a resolution of intent to repay costs allocated to 
water supply storage. 
Operations and results during fiscal year. Construction of 
embankment, dike, spillway, and relocations was 
completed. Engineering studies and land acquisition 
was completed. All project structures were operated 
and maintained in a serviceable condition. Six noteworthy 
rises occurred above reservoir. Flooding was 
prevented on an average of 8,900 acres of land. 
Estimated monetary benefits attributed to reservoir 
operation for prevention of flood damages total $973, 
000 to June 30, 1970. During low-flow water periods, 
releases totaling 29,187 acre-feet were made from 
reservoir to supplement municipal water supply for 
downstream towns and other usages. (See table 19-E 
for pool elevations and storages during fiscal year.) 
Condition at end of fiscal year. Construction was started 
in February 1963, impoundment commenced in June 
1969 and project is 98 percent complete. 
36. POLECAT CREEK, OKLA. (HEYBURN 
LAKE AND CHANNEL IMPROVEMENT) 
Location. A minor tributary to Arkansas River near 
Sapulpa, Creek County, Okla. (See Geological Survey 
maps for Nuyaka, Hominy and Claremore, Okla., 
quadrangles, scale 1:250,000; and Bristow and Kiefer, 
Okla., quadrangles, scale 1:62,500.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Estimated Federal cost is $2,507,000 (including 
$135,300 for construction of channel improvement on 
Polecat and Rock Creeks). 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. Rural Water 
District No. 1, Creek County, Okla., used 439 acre-feet 
of water from the reservoir. Four noteworthy rises 
occurred above reservoir. Flooding was prevented on 
an average of about 1,200 acres of land. Estimated 
monetary benefits attributed to reservoir operations for 
prevention of flood damages total $1,152,000 to June 
30, 1970. (See table 19-E for pool elevations and 
storages during fiscal year.) 
Condition at end of fiscal year. Construction was started 
March 1948 and project ready for beneficial use in 
October 1950. Channel improvements below reservoir 
were completed September 1952. Project is complete 
except for additional recreational facilities. 
37. RED RIVER BELOW DENISON DAM 
(TULSA DISTRICT) 
Location. On Red River and its tributaries below 
Denison Dam, in Okla., Ark., Tex., and La. 
Existing project. Provides for construction of 11 flood 
control lakes in combination with existing or authorized 
Federal and non-Federal levee improvements, 
modified as required, and channel stabilization at 
locations where levee setbacks are impossible or 
uneconomical. See table 19-F for water-control projects 
included in general flood control plan for Red River 
below Denison Dam within Tulsa District. (See also 
table 19-B for authorizing legislation.) Total estimated 
Federal cost in Tulsa District is $388,994,780 for 
construction, lands, and damages. 
38. SHIDLER LAKE, ARKANSAS RIVER 
BASIN, OKLA. 
Location. On Salt Creek, mile 39.2, a tributary of 
Arkansas River, about 1 mile east of Shidler, Osage 
County, Okla. (See Geological Survey maps for 
Fairfax, Okla., quadrangle, scale 1:24,000.) 
Existing project. Provides for an earthfill dam 3,000 
feet long and a maximum height of 106 feet above 
streambed. Uncontrolled spillway 300 feet wide will be 
east of dam. Outlet works will include an uncontrolled 
circular drop inlet with a conduit 8.25 feet in diameter. 
A 24-inch low-flow bypass and a 24-inch water supply 
line will be provided. A roadway will be located along 
crest of dam. A total reservoir capacity of 45,500 acrefeet 
will be allocated, 29,500 for flood control and 16, 
000 for conservation, and will control runoff from 111 
square miles. Shidler Lake will be operated as a unit of 
coordinated reservoir system for flood control in 
Arkansas River Basin. Estimated cost of the project is 
$8,300,000. (See table 19-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938 
and Water Supply Act of 1958 as amended, apply. 
Operations and results during fiscal year. Preconstruction 
planning was completed. 
Condition at end of fiscal year. Preconstruction planning 
is complete. 
39. SKIATOOK LAKE, VERDIGRIS RIVER 
BASIN, OKLA. 
Location. On Hominy Creek, mile 14.3, a tributary of 
Bird Creek, in Verdigris River Basin about 5 miles west 
of Skiatook, Osage County, Okla. (See Geological 
Survey map, Hominy, Okla., quadrangle, scale 1:125, 
000 and Army Map Service, Enid, Okla., map, scale 
1:250,000.) 
585

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Existing project. Provides for an earthfill dam 3,590 
feet long, including an uncontrolled spillway section, 
143 feet above streambed. Outlet works will include a 
gated sluice, a 48-inch low-flow pipe, and a 24-inch 
water supply pipe. Reservoir will provide a total 
storage of 513,500 acre-feet (331,200 for conservation 
storage and 182,300 for flood control) and will control a 
drainage area of 354 square miles. Skiatook Lake will 
be operated as a unit of a five-reservoir system for flood 
control in Verdigris River tributaries in Oklahoma. 
Estimated cost of project is $36,900,000. (See table 19- 
B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938, 
and section 301, Water Supply Act of 1958, apply. 
Operations and results during fiscal year. Preconstruction 
planning completed. Engineering studies continued. 
Condition at end of fiscal year. Preconstruction planning 
is complete. 
40. TORONTO LAKE, ARKANSAS RIVER 
BASIN, KANS. 
Location. On Verdigris River about 271.5 miles above 
its mouth and 4 miles south and east of Toronto, 
Woodson County, Kans. (See Geological Survey map 
for Fredonia, Kans., quadrangle, scale 1:125,000.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Federal cost is $13,894,002. 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. Six noteworthy 
rises occurred above the reservoir. Flooding was 
prevented on an average of 23,500 acres of land. 
Estimated monetary benefits attributed to operation of 
Toronto Lake prevention of flood damages total $9, 
398,000 to June 30, 1970. Toronto, Kans., used 62 acrefeet 
of water from lake. (See table 19-E for pool 
elevations and storages during fiscal year.) 
Condition at end of fiscal year. Construction began 
November 1954 and project placed in a full operation 
March 1960. 
41. WAURIKA LAKE, RED RIVER BASIN, 
OKLA. 
Location. Beaver Creek, mile 27.0, a tributary of Red 
River, about 6 miles northwest of Waurika, Jefferson 
County, Okla. (See Geological Survey Map for 
Hastings, Okla.-Tex., quadrangle, scale 1:62,500.) 
Existing project. Plan provides for an earthfill dam 16, 
500 feet long, including an uncontrolled spillway 200 
feet long, and 106 feet above streambed. A dike 3,100 
feet long with a maximum height of 9 feet will be 1 mile 
northeast of dam. Outlet works will include a gated 
conduit 13.5 feet in diameter, a 48-inch water supply 
pipe and a 12-inch low-flow pipe. Reservoir will 
provide a total storage of 328,600 acre-feet (170,200 for 
conservation storage, 117,000 for flood control, and 41, 
400 for sedimentation reserve) and will control a 
drainage area of 562 square miles. Waurika Lake will 
be operated as a unit of a coordinated reservoir system 
for flood control in Red River Basin. Estimated cost is 
$42,100,000. (See table 19-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938 
and section 301, Water Supply Act of 1958, as 
amended, apply. 
Operations and results during the fiscal year. Preconstruction 
planning completed. Engineering studies 
continued. 
Condition at end of fiscal year. Preconstruction planning 
is complete. 
42. WISTER LAKE, ARKANSAS RIVER 
BASIN, OKLA. 
Location. On Poteau River, river mile 60.9, about 2 
miles south of Wister, Le Flore County, Okla. (See 
Geological Survey map for Winding Stair, Okla., 
quadrangle, scale 1:125,000.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Federal cost was $10,501,226. 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. Six noteworthy 
rises occurred above the reservoir. Flooding was 
prevented on an average of 20,600 acres of land. 
Estimated monetary benefits attributed to Wister Lake 
operations for prevention of flood damages total $21, 
947,000 to June 30, 1970. During low-water periods 
releases totaling 1,177 acre-feet were made from 
reservoir to supplement municipal water supply for 
downstream towns and other usages. A total of 363 
acre-feet of impounded water supply storage was 
withdrawn from the reservoir during the year by city of 
Heavener, Okla. (See table 19-E for pool elevations 
and storages during fiscal year.) 
Condition at end of fiscal year. Construction was started 
April 1946 and completed May 1949. Oklahoma 
Planning and Resources Board leased 3,040 acres for 
development of State park areas and Oklahoma 
Department of Wildlife Conservation is utilizing 17, 
996 acres of project lands for game management 
purposes. Project placed in full flood control operation 
in October 1949. 
43. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS. 
Semiannual inspections are conducted to see if local 
interests are complying with existing regulations and 
requirements in maintaining and operating projects 
constructed with Federal funds and transferred to 
them. Inspections conducted during fiscal year indicate 
existing agreements and regulations are being complied 
with. Inspection indicates that additional main- 
586

TULSA, OKLA., DISTRICT 
tenance needs to be programed by local interests 
during ensuing years at the following: Augusta Levee, 
Kans., Polecat Creek Channel Improvement, Okla., 
Oklahoma City Floodway, Okla., Sand Creek Channel 
Improvement, Kans., Walnut Bayou Channel Improvement, 
Ark., and Coffeyville Levee, Kans. (See 
table 19-G on inspection of flood control projects.) 
Fiscal year cost was $49,977. Total cost to June 30, 
1970 was $136,957. 
44. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS. 
Flood Control Act of 1944 authorized the Secretary 
of War to prescribe regulations for use of storage 
allocated for flood control or navigation at all 
reservoirs constructed wholly or in part with Federal 
funds. Under the purview of this act, operation of the 
flood control storage included in reservoirs shown in 
table 19-H is prescribed by the Corps. Work accomplished 
consists of operating activities necessary in 
basin-wide coordination of functional scheduling of 
releases from reservoirs operated by other agencies and 
preparation of flood control operation and maintenance 
manuals for projects underway. Fiscal year 
cost from maintenance funds was $144,743. 
45. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS. 
See table 19-I. 
46. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION. 
Flood control activities pursuant to section 205, Public Law 
858, 80th Congress, as amended (preauthorization). 
See table 19-J. 
Emergency flood control activities-repairf,l oodf ighting, and 
rescue work (Public Law 99, 84th Cong., and antecedent 
legislation). 
Federal cost for fiscal year was $23,239 for advance 
preparation and $73,798 for repair and restoration. 
Snagging and clearing of navigable streams and tributaries in 
interest of flood control (Sec. 208, 1954 Flood Control Act, 
Public Law 780, 83d Cong.). 
None. 
Emergency bank protection (Sec. 14, 1946 Flood Control Act, 
Public Law 526, 79th Cong.). 
None.
MULTIPLE-PURPOSE PROJECTS 
INCLUDING POWER 
47. BROKEN BOW LAKE, RED RIVER 
BASIN, OKLA. 
Location. On Mountain Fork River, river mile 20.3, 
about 9 miles northeast of Broken Bow, McCurtain 
County, Okla. (See Geological Survey maps for Broken 
Bow and Smithville, Okla., quadrangles.) 
Existing project. An earthfill dam about 2,820 feet 
long, 225 feet above streambed. Total length of dam, 
dike, and spillway is 4,096 feet. A gated concrete 
spillway, 376 feet wide, is located in a saddle about 1.25 
miles northwest of dam. Spillway is controlled by eight 
40- by 40-foot tainter gates. Outlet works consists of a 
4- by 4-foot low-flow sluice gate and a 24-inch water 
supply pressure conduit. The lake, which controls 754 
square miles of drainage area, provides for storage of 1, 
368,800 acre-feet (450,000 for flood control, 470,100 for 
power and water supply, and 448,700 for inactive or 
powerhead). A penstock tunnel was constructed 
through left abutment to powerhouse located below a 
horseshoe bend in river. Hydroelectric development 
consists of two units with an installed capacity of 100, 
000 kilowatts. Project operated as a unit in a sevenreservoir 
system for flood control in Little River 
Watershed and for reduction of floodflows on Red 
River. Estimated project cost is $41,042,000. (See table 
19-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, and Water Supply Act of 1958, as amended, 
apply. Mountain-Lakes Water District furnished a 
resolution of intent to repay costs allocated to water 
supply storage. 
Operations and results during fiscal year. Construction of 
power facilities and reregulation dam was completed. 
Engineering studies, relocations, and land acquisition 
was completed. Six noteworthy rises occurred above 
the reservoir. Operation of reservoir prevented downstream 
flooding on an average of 11,000 acres of land 
for each rise. Estimated monetary benefits attributed to 
reservoir operations for prevention of flood damages 
total $1,826,000 to June 30, 1970. During low-flow 
water periods, releases totaling 85,727 acre-feet were 
made from reservoir to supplement municipal water 
supply for downstream towns and other usages. 
Delivered 97,640,500 kilowatt-hours of electric energy 
to Southwestern Power Administration for distribution 
and sale, and released 576,031 acre-feet of water 
through turbines. (See table 19-E on pool elevations 
and storages during fiscal year.) 
Condition at end of fiscal year. Construction began in 
November 1961 and project is 98 percent complete. 
Impoundment began October 1968 and was completed 
with power-on-line June 1970. Commercial power 
generation began in January 1970. 
48. DENISON DAM-LAKE TEXOMA, RED 
RIVER, TEX., AND OKLA. 
Location. On Red River, river mile 725.9, about 5 
miles northwest of Denison, Tex. (See Geological 
Surveys maps for Denison, Tex., and Tishomingo, 
Okla., quadrangles scale 1:125,000; and Denison Dam 
and Cordonville, Tex., quadrangles, scale 1:62,500.) 
Existing project. For description of completed improvements 
and authorizing legislation see Annual 
Report for 1969. Hydroelectric development consists of 
587

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
two units having an installed capacity of 70,000 
kilowatts. Ultimate installation planned is for five units 
with a total of 175,000 kilowatts. Lake Texoma 
operated as a unit of a coordinated reservoir system 
from flood control in Red River Basin. Estimated costs 
are shown on table 19-K. 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. No noteworthy 
rises occurred above the reservoir. Estimated monetary 
benefits attributed to Denison Dam-Lake Texoma 
operation for prevention of flood damages downstream 
to Fulton, Ark., total $28,979,000 to June 30, 1970. 
(See table 19-E on pool elevations and storages during 
fiscal year.) A total of 245 acre-feet was made available 
from reservoir for water supply for city of Denison, Tex. 
Delivered 162,421,000 kilowatt-hours of electric energy 
to Southwestern Power Administration for distribution 
and sale, and released 1,796,857 acre-feet of water 
through turbines. 
Condition at end of fiscal year. Construction was started 
in August 1939 and was completed for the dam, 
spillway, and outlet works in February 1944. Impoundment 
of power pool began January 1944 and 
commercial power generation was started March 1945 
with first unit operating. 
49. EUFAULA LAKE, CANADIAN RIVER, 
OKLA. 
Location. On Canadian River about 12 miles east of 
Eufaula, McIntosh County, Okla. (See Geological 
Survey maps for Okmulgee, Canadian, McAlester, and 
Sans Bois, Okla., quadrangles, scale 1:125,000.) 
Existing project. Concrete and earthfill dam is 3,200 
feet long and 114 feet above streambed, and reservoir 
has a storage capacity of 1,470,000 acre-feet for flood 
control, 1,481,000 acre-feet for generation of power and 
water supply, and provides a permanent pool of 897, 
000 acre-feet for sedimentation reserve, recreation, and 
preservation of wildlife, a total of 3,848,000 acre-feet. 
Oklahoma State Highway 71 crosses the crest of dam. 
A concrete ogee-weir spillway, controlled by eleven 40- 
by 32-foot gates on weir crest, provides for passage of 
floodflows into valley below. The outlet works consists 
of 5-foot-8inch by 7-foot low-flow sluices. Hydroelectric 
development has a total installed capacity of 90,000 
kilowatts from three hydroelectric generating units. 
Eufaula Lake, which controls a drainage area of 47,522 
square miles, is operated as a unit of comprehensive 
system for improvement of Arkansas River Basin for 
flood control, navigation, hydroelectric power, and 
other purposes. Estimated Federal cost is $121,775,000. 
(See table 19-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies. State of Oklahoma indicated a desire 
to participate in relocation of certain State and Federal 
highways affected by construction of reservoir, and 
paid added cost of building highways of greater width 
than project requirements. Under terms of existing 
contracts, Haskell County Water Company, Pittsburg 
County Water Authority, Rural Water District No. 4, 
Pittsburg County, and Pittsburg and Haskell Counties 
paid $1,704 to the Treasury during FY 70 for water 
supply rights in the reservoir. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. Construction of 
additional recreational facilities continued. Four noteworthy 
rises occurred above the reservoir. Operation of 
reservoir prevented downstream flooding on an average 
of 6,800 acres of land. A total of 181 acre-feet of 
impounded water was drawn from the reservoir by 
Pittsburg County Water Authority and Pittsburg and 
Haskell Counties. Estimated monetary benefits attributed 
to Eufaula Lake operations for prevention of 
flood damages total $3,913,000 to June 30, 1970. 
Delivered 174,192,500 kilowatt hours of electric energy 
to Southwestern Power Administration for distribution 
and sale, and released 2,306,604 acre-feet of water 
through turbines. (See table 19-E on pool elevations 
and storages during fiscal year.) 
Condition at end of fiscal year. Construction of project, 
initiated in December 1956 and completed in December 
1965. Project is complete except for additional 
recreational facilities. Commercial power was generated 
on unit No. 1 July 1964, on unit No. 2 
September 1964, and on unit No. 3 August 1964. Full 
flood control operation began February 1964. 
50. FORT GIBSON LAKE, ARKANSAS 
RIVER BASIN, OKLA. 
Location. On Grand (Neosho) River about 5 miles 
north and east of Fort Gibson, Muskogee County, 
Okla. (See Geological Survey maps for Muskogee and 
Pryor, Okla., quadrangles, scale 1:125,000; and 
Wagoner, Okla., quadrangle, scale 1:62,500.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Estimated cost is $42,709,000. 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. Construction of 
additional recreational facilities continued. One noteworthy 
rise occurred above the reservoir. Flooding was 
prevented on an average of 16,300 acres of land. 
Estimated monetary benefits attributed to Fort Gibson 
Lake operations for prevention of flood damages total 
$9,531,000 to June 30, 1970. (See table 19-E on pool 
elevations and storages during fiscal year.) Delivered 
224,689,600 kilowatt-hours of electrical energy to 
Southwestern Power Administration for distribution 
and sale and released 4,528,160 acre-feet of water 
through turbines. 
Condition at end of fiscal year. Construction began in 
March 1942 with construction of temporary field office 
buildings, but further construction at project was held 
in abeyance during World War II. Construction of 
588

TULSA, OKLA., DISTRICT 
concrete dam and spillway, largest single feature of 
project, started May 1946 was completed in June 1950. 
Fourth generator installed and project placed in full 
operation in September 1953. 
51. KEYSTONE LAKE, ARKANSAS RIVER, 
OKLA. 
Location. On Arkansas River near Sand Springs, 
Okla., and about 15 miles west of Tulsa, Okla. (See 
Geological Survey Map for Hominy, Okla., quadrangle, 
scale 1:125,000; Skedee and Yale, Okla., 
quadrangles, scale 1:62,500; and Keystone Dam 
quadrangle, scale 1:24,000.) 
Existing project. An earthfill dam 4,600 feet long, with 
a gate-controlled concrete spillway structure and a 
hydroelectric power generating plant near left abutment. 
Concrete section is 1,600 feet long 121 feet 
above riverbed, and includes power intake works and 
an 856-foot spillway section. Oklahoma State Highway 
151 traverses crown of dam. Flow over spillway is 
controlled by 18 tainter gates 40 feet wide and 35 feet 
high. Low-flow releases are regulated by nine 5-foot-8- 
inch by 10-foot gated sluices through spillway weir. 
Two 27-foot penstocks and two 35,000-kilowatt generating 
units are installed. Project is a unit of 
authorized Arkansas River navigation plan. Reservoir 
controls runoff from a normal contributing drainage 
area of 22,351 square miles and storage totals 1,879,000 
acre-feet (1,216,000 for flood control, 351,000 for power 
drawdown, and 312,000 for powerhead). Normal or 
power pool has a surface area of 26,300 acres. 
Estimated cost is $123,901,000. (See table 19-B for 
authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. State of Oklahoma participated in relocation 
of certain State and Federal highways affected by 
construction of reservoir. Extent of their participation 
to end of fiscal year, $5,366,231. Gulf Oil Corp. and W. 
E. Stiles Engineering Co. each have five-year contracts 
for water supply storage. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. Construction of 
additional recreational facilities continued and second 
stage channel excavation was completed. Generating 
units were declared ready for commercial operation in 
May 1968. Produced 222,854,400 kilowatt-hours of 
electric energy for delivery to Southwestern Power 
Administration for distribution and sale, and released 
3,197,737 acre-feet of water through turbines. Three 
noteworthy rises occurred above the reservoir. Operation 
of Keystone Lake prevented downstream 
flooding on about 4,400 acres of land. A total of 362 
acre-feet of impounded water was withdrawn from the 
lake by Gulf Oil Corp. Estimated monetary benefits 
attributed to operation of Keystone Lake for prevention 
of flood damages total $4,448,000 to June 30, 
1970. (See table 19-E on pool elevations and storages 
during fiscal year.) 
5 
451-584 0-72-38 
Condition at end of fiscal year. Construction initiated in 
January 1957, and project is 99 percent complete. 
Project placed in flood control operation in September 
1964. No. 1 generating unit became operational on 
May 21, 1968 and No. 2 on May 2, 1968. 
52. LAKE HUDSON, ARKANSAS RIVER 
BASIN, OKLA. 
Location. On Grand (Neosho) River, about 8 miles 
southeast of city of Pryor, Mayes County, Okla. (See 
Geological Survey maps for Pryor and Vinita, Okla., 
quadrangles, scale 1:125,000.) 
Existing project. For description of completed improvement 
and authorizing legislation see Annual 
Report for 1969. Cost is $6,008,756. 
Local cooperation. None required. 
Operations and results during fiscalyear. One noteworthy 
rise occurred above the lake. Flooding was prevented 
on an average of about 4,400 acres of land. Estimated 
monetary benefits attributed to the operation of Lake 
Hudson for flood damage prevention total $207,000 to 
June 30, 1970. (See table 19-E on pool elevations and 
storages during fiscal year.) 
Condition at end of fiscal year. Federal participation in 
project is complete. 
53. PENSACOLA LAKE, ARKANSAS 
RIVER BASIN, OKLA. 
Location. On Grand (Neosho) River, next to town of 
Disney, Mayes County, Okla. (See Geological Survey 
maps for Pryor, Wyandotte, Vinita, Okla., and Siloam 
Springs, Ark., quadrangles, scale 1:125,000.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Estimated cost (July 1959) for acquisition of 
additional flowage easements necessary for operation 
of reservoir to elevation 755 is $2,090,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations and results during fiscal year. Flood control 
storage in project was operated by Grand River Dam 
Authority (an agency of State of Oklahoma) under 
direction of the Corps. Four noteworthy rises occurred 
above the lake. Flooding was prevented on an average 
of about 9,100 acres of land. Estimated monetary 
benefits attributed to Pensacola Lake operations for 
prevention of flood damages total $18,149,000 to June 
30, 1970. (See table 19-E on pool elevations and storage 
during fiscal year.) 
Condition at end offiscal year. Project is complete. 
54. ROBERT S. KERR LOCK AND DAM 
AND RESERVOIR, ARKANSAS RIVER, 
OKLA. 
Location. On Arkansas River about 8 miles south of 
Sallisaw, Le Flore County, Okla. (See Geological 
89

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Survey Maps for Robert S. Kerr Dam, Keota, Vian, 
Sallisaw, Stigler NE, and Webbers Falls, Okla., 
quadrangles, scale 1:24,000 and Army Map Service, 
Fort Smith, Ark., quadrangle, scale 1:250,000.) 
Existing project. An earthfill dam, powerplant, navigation 
lock, and appurtenant facilities, with a slackwater 
pool about 37 miles long, extending to Webbers 
Falls Lock and Dam. Structure will rise 75 feet above 
the streambed and have a overall length of 7,360 feet, 
including a gated concrete spillway, a power intake, a 
single lift navigation lock, and two earth embankments. 
The fixed structure has its foundation on 
shale. Spillway consists of eighteen 50- by 44-foot radial 
type gates. Navigation lock chamber is 110 feet wide 
and 600 feet long and provides a lift of 48 feet. The 
normal pool elevation will be 460 feet mean sea level. 
The miter sill depths at normal pool will be 18 feet for 
the upper pool and 14 feet for the lower pool. Bridges 
crossing Sans Bois Creek embayment will provide 
adequate clearances for navigation. Powerhouse will 
provide for installation of four generating units of 27, 
500 kilowatts each. Reservoir will have a storage of 493, 
600 acre-feet at top of power pool. Reservoir controls a 
drainage area of 147,756 square miles. Project is a unit 
in multiple-purpose plan for navigation of Arkansas 
River. Estimated cost is $92,337,000. (See table 19-B 
for authorizing legislation.) 
Local cooperation. See Little Rock, Ark., District 
section of this report. 
Operations and results during fiscal year. Construction of 
access roads, project buildings, initial stage of recreation 
facilities, spillway, lock, embankment, reservoir 
clearing, and relocation of US Highway 59, county 
roads, and various utility relocations is complete. 
Construction of powerhouse, railroad and State and 
Federal road relocation, engineering studies, and 
acquisition of land continued. Sans Bois Creek clearing 
was initiated. 
Condition at end of fiscal year. Project was started April 
1964 and is about 93 percent complete. 
55. TENKILLER FERRY LAKE, 
ARKANSAS RIVER BASIN, OKLA. 
Location. On Illinois River about 7 miles northwest of 
Vian and 7 miles northeast of Gore, Sequoyah County, 
Okla. (See Geological Survey maps for Muskogee, 
Okla., and Tahlequah, Okla., and Ark., quadrangles, 
scale 1:125,000; and Webbers Falls, Okla., quadrangle 
scale 1:62,500.) 
Existing project. For description of completed project 
and authorizing legislation see Annual Report for 
1969. Estimated cost of project is $23,845,000. 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Routine operation 
and maintenance continued. Three noteworthy 
rises occurred above the reservoir. Operation of 
reservoir prevented downstream flooding on an average 
of 2,100 acres of land. Estimated monetary 
benefits attributed to Tenkiller Lake operations for 
prevention of flood damages total $2,933,000 to June 
30, 1970. (See table 19-E on pool elevations and 
storages during fiscal year.) Delivered 101,923,800 
kilowatt-hours of electrical energy to Southwestern 
Power Administration for distribution and sale and 
released 802,964 acre-feet of water through turbines. 
Released 2,369 acre-feet from reservoir to East Central 
Oklahoma Water Authority, Kerr-McGee Corps., and 
Cookson Water and Development Corp. 
Condition at end of fiscal year. Initial construction was 
started June 1947 and completed in July 1953. 
Commercial sale of power started November 1953, 
with unit No. 2. Unit No. 1 installed December 1953. 
Work required to complete project consists of additional 
recreational facilities. Work on repair and 
extension of spillway apron initiated in July 1960 and 
completed in August 1961. 
56. WEBBERS FALLS LOCK AND DAM, 
ARKANSAS RIVER, OKLA. 
Locations. On Arkansas River 1 mile northwest of 
Gore, Okla. (See Geological Survey Maps for Webbers 
Falls, Keefeton, and Wagoner, Okla., quadrangles, 
scale 1:62,500 and Army Map Service, Fort Smith, 
quadrangle, scale 1:250,000.) 
Existing project. An earthfill dam, powerplant, navigation 
lock, and appurtenant facilities, with a slackwater 
pool 37 miles long extending to Lock and Dam 
17 on Verdigris River. Structure will have a length of 4, 
500 feet, a height of 79 feet above streambed, and will 
include gated concrete spillway, concrete nonoverflow 
and power intake section, and a lock flanked by earth 
embankments. The fixed structure has its foundation 
on limestone with some shale in the area. Spillway will 
have twelve 50- by 41-foot radial type gates. Navigation 
lock will be 110 feet wide and 600 feet long with 
a lift of 30 feet. The normal pool elevation will be 490 
feet mean sea level. The miter sill depths at normal 
pool will be 19 feet for the upper pool and 16 feet for 
the lower pool. Powerhouse will provide for installation 
of three generating units of 20,000 kilowatts each. 
Reservoir formed by dam will be a storage of 97,033 
square miles. Project is a unit in multiple-purpose plan 
for navigation of Arkansas River. Estimated cost is $80, 
300,000. (See table 19-B for authorizing legislation.) 
Local cooperation. See requirements for overall Arkansas 
River and tributaries multiple-purpose project. 
Operations and results during fiscal year. Construction of 
access roads, bank stabilization, project buildings, and 
relocation of county and Federal roads and various 
utilities is complete. Construction of relocation of State 
roads and railroads, embankment, lock, 1st stage 
powerhouse, supply contracts, engineering studies, and 
acquisition of land continued. Channel excavation was 
initiated. 
590

TULSA, OKLA., DISTRICT 
Condition at end of fiscal year. Construction of project 58. COLLECTION AND STUDY OF BASIC 
started January 1965 and is 69 percent complete. DATA 
GENERAL INVESTIGATIONS Fiscal year cost was $139,964 for flood plain 
information studies. (See table 19-L for completed 
57. SURVEYS. flood plain information reports.) 
Fiscal year cost was $427,039, of which $24,485 was 
for navigation, $345,786 for flood control, $24,697 for 59. RESEARCH AND DEVELOPMENT 
coordination with other agencies, and $32,071 for 
comprehensive studies. Fiscal year cost was $8,757 for hydrologic studies. 
591

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 19-A 
See 
Section 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
440,000 413,000 
134,207 410,812 
25,000 
267,011 
49,556 
115,821 
8,075 
in Text Project 
2. Bank Stabilization 
& Channel Rectification, 
Arkansas River, 
Fort Smith, Ark. 
to Robert S. Kerr 
Lock & Dam & Reservoir, 
Okla. 
3. Low Head Locks 
& Dams, Arkansas 
River, Okla. 
(Federal Funds) 
(Contributed 
Funds) 
4. Maintenance & Repair 
& Fleet & Marine 
Terminals, Okla. 
6A. Experimental Water 
Quality Study 
Projects, Red River 
Basin, Tex. 
6B. Ark-Red Chloride 
Control, Supplemental 
Studies, 
Okla. 
6C. Ark-Red Chloride 
Control, Part I, 
Tex. 
7. Big Hill Lake, 
Verdigris River 
Basin, Kans. 
8. Candy Lake, 
Verdigris River 
Basin, Okla. 
9. Canton Lake, 
Arkansas River Basin, 
Okla. 
10. Cherry & Red Fork 
Creeks, Okla. 
11. Clayton Lake, 
Red River Basin, 
Okla. 
12. Copan Lake, 
Verdigris River 
Basin, Okla. 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
13,300,000 
11,079,460 
198,000 
179,608 
119,330 
100,000 
53,424 
-475 
476 
3,000 
1,746 
14,745 
170,900 
185,692 
3,440 
10,886 
278,000 
180,326 
26,887,000 
23,417,918 
279,000 
91,496 
38,307 
387,000 
353,856 
7,000 
7,932 
781,200 
176,505 
105,000 
21,240 
448 
3,527 
36,000 
14,538 
40,041 
39,116 
178,000 
182,669 
76,100 
31,510 
900 
69,960 
12,700,038 
12,700,038 
1,847,110 
1,847,110 
95,806,687 
93,368,223 
843,888 
842,623 
119,330 
118,050 
2,066,000 
2,022,355 
300,028 
300,028 
22,276 
20,377 
2,429,200 
1,912,144 
809,000 
759,604 
290,248 
290,119 
381,000 
279,479 
10,631,171 
10,594,737 
2,863,865 
2,856,078 
291,106 
291,106 
272,712 
261,448 
346,000 
342,863 
724,000 
708,921 
592 
24,565,000 
28,055,338 
309,000 
231,800 
39,510 
1,035,000 
869,734 
4,000 
2,651 
945,000 
707,877 
363,000 
257,000 
5,000 
2,840 
122,000 
100,460 
6,382 
7,216 
185,800 
178,541 
178,609 
97,000 
58,080 
4,000 
7,647 
27,772,744 
27,923,844 
57,888 
339,719 
40,233 
494,000 
724,338 
8,276 
8,048 
703,000 
1,027,762 
341,000 
480,770 
2,031 
223,000 
164,481 
37,000 
656 
193,899 
198,908 
9,396 
249,000 
284,783 
22,540

TULSA, OKLA., DISTRICT 
TABLE 19-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
13. Council Grove 
Funding 
New Work 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
Lake, Grand Approp. -6,933 27,000 10,000 -3,096 11,480,904 
(Neosho) River Cost 3,700 21,299 12,596 9 11,480,904 
Basin, Kans. Maint. 
Approp. 104,900 140,000 192,000 247,392 924,492 
Cost 187,055 152,096 173,727 194,324 846,777 
14. Cow Creek, New Work 
Kans. Approp. 120,000 14,310 100,000 60,000 334,310 
Cost 61,018 55,923 67,957 137,688 334,574 
15. Crutcho Creek, New Work 
Okla. Approp. 50,000 80,000 200,000 60,000 390,000 
Cost 26,394 99,928 31,401 22,437 180,160 
16. DeQueen Lake, Red New Work 
River Basin, Approp. 600,000 1,170,000 1,500,000 180,000 4,849,600 
Ark. Cost 984,490 1,339,052 1,283,798 372,875 4,801,544 
17. Dierks Lake, Red New Work 
River Basin, Approp. 400,000 502,000 970,000 306,000 2,699,923 
Ark. Cost 158,202 530,966 739,878 526,873 2,454,184 
18. El Dorado Lake, New Work 
Arkansas River Approp. 100,000 252,800 335,000 - 687,800 
Basin, Kans. Cost 62,817 281,538 326,936 9,705 680,996 
19. Elk City Lake, New Work 
Arkansas River Approp. - 110,000 284 512 19,042,989 
Basin, Kans. Cost 241,910 126,324 1,387 388 19,042,865 
Maint. 
Approp. 104,000 130,500 164,900 189,902 706,302 
Cost 150,214 168,148 159,893 183,355 684,815 
20. Fall River Lake, New Work 
Arkansas River Approp. - - - - 10,494,413 
Basin, Kans. COst - - - - 10,494,413 
Maint. 
Approp. 95,000 126,500 100,200 154,361 1,869,368 
Cost 76,182 115,576 118,978 156,451 1,856,198 
21. Fort Supply Lake, New Work 
North Canadian Approp. - 34,046 -1,382 - 7,592,822 
River, Okla. Cost - 32,647 17 - 7,592,822 
Maint. 
Approp. 115,000 118,000 133,800 144,795 2,094,417 
Cost 110,130 118,236 115,076 169,847 2,091,873 
22. Gillham Lake, Red New Work 
River Basin, Approp. 1,500,000 1,020,000 2,100,000 1,048,000 9,677,100 
Ark. Cost 1,713,299 939,238 2,253,280 1,018,039 9,495,987 
23. Great Salt Plains New Work 
Lake, Salt Fork of Approp. - - - - 4,626,270 
Arkansas River, Cost - - - - 4,626,270 
Okla. Maint. 
Approp. 70,000 46,500 70,500 98,555 1,566,898 
Cost 63,070 58,673 67,753 103,170 1,566,666 
24. Hugo Lake, Kiamichi New Work 
River, Okla. Approp. 625,000 1,700,000 2,960,000 6,520,000 12,259,971 
Cost 361,820 1,871,755 2,870,262 5,984,066 11,516,649 
25. Hulah Lake, Caney New Work 
River, Okla. Approp. 22,550 42,500 - -11 11,164,659 
Cost 25,276 41,495 994 - 11,164,659 
Maint. 
Approp. 152,500 152,000 191,300 206,800 2,096,490 
Cost 194,293 164,105 135,708 215,547 2,042,587 
Minor rehab. 
Approp. - - - - 135,718 
Cost - - - - 135,718 
593

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 19-A (Continued) 
See 
Section 
in Text Project 
26. John Redmond Dam 
& Reservoir, Grand 
(Neosho) River 
Basin, Kans. 
27. Kaw Lake, Arkansas 
River Basin, 
Okla. 
28. Lake Kemp, Wichita 
River, Tex. 
29. Lukfata Lake, Red 
River Basin, 
Okla. 
30. Marion Lake, Grand 
(Neosho) River 
Basin, Kans. 
31. Millwood Lake, Red 
River Basin, 
Ark. 
32. Oologah Lake, 
Arkansas River 
Basin, Okla. 
33. Optima Lake, North 
Canadian River, 
Okla. 
34. Pat Mayse Lake, Red 
River Basin, Tex. 
35. Pine Creek Lake, 
Red River Basin, 
Okla. 
36. Polecat Creek, 
Okla. (Heyburn 
Lake and Channel 
Improvement) 
38. Shidler Lake, 
Arkansas River 
Basin, Okla. 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
-18,000 
9,765 
167,600 
209,354 
1,700,000 
1,517,083 
315,101 
178,325 
100,000 
99,609 
3,733,058 
2,988,324 
856,933 
1,115,776 
140,000 
173,055 
550,000 
113,428 
222,000 
196,857 
1,600,000 
1,641,538 
2,150,000 
2,902,984 
20,000 
3,366,942 
4,113,490 
100,000 
101,437 
50,000 
22,759 
9,050 
14,576 
189,500 
213,391 
2,560,000 
2,767,981 
85,000 
232,627 
120,000 
80,929 
1,253,000 
1,947,191 
92,000 
83,072 
143,000 
218,158 
203,000 
198,438 
890,000 
899,720 
263,000 
269,873 
1,525,000 
1,524,200 
1,506,000 
1,559,581 
83,500 
85,507 
6,326,000 
6,078,977 
4,459 
4,459 
151,500 
117,272 
97,300 
98,735 
2,000 
10,520 
199,800 
173,904 
3,928,000 
4,028,713 
723,000 
92,618 
75,000 
121,483 
25,000 
161,954 
129,900 
130,201 
82,600 
82,387 
220,800 
232,959 
3,120,000 
2,006,914 
251,100 
237,340 
500,000 
404,954 
169,690 
460,171 
131,700 
135,639 
3,799,000 
3,756,012 
22,000 
13,805 
109,000 
138,933 
170,000 
122,995 
8,313 
3,735 
254,806 
233,948 
5,622,850 
5,289,835 
-77,313 
163,325 
30,000 
31,121 
115,000 
113,311 
211,184 
204,500 
66,500 
69,382 
229,916 
227,453 
2,992,488 
2,401,854 
576,112 
346,300 
349,850 
538,468 
185,000 
184,523 
217,612 
145,829 
173,000 
447,511 
212,824 
201,178 
25,000 
513 
119,560 
111,192 
10,000 
80,146 
28,002,863 
27,992,389 
1,127,106 
1,072,736 
15,005,850 
14,659,294 
1,344,088 
947,196 
539,035 
538,947 
13,348,058 
13,311,485 
433,084 
417,773 
44,225,925 
44,218,270 
843,216 
836,111 
44,231,079 
42,095,320 
2,128,013 
1,862,496 
5,420,674 
5,399,917 
9,110,960 
9,086,226 
452,812 
366,975 
19,824,235 
19,780,249 
234,824 
214,983 
2,476,333 
2,451,846 
1,271,549 
1,246,764 
327,300 
324,635 
594

TABLE 19-A (Continued) 
TULSA, OKLA., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
39. Skiatook Lake, 
Verdigris River 
Basin, Okla. 
40. Toronto Lake, 
Arkansas River 
Basin, Kans. 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
41. Waurika Lake, Red New Work 
River Basin, Approp. 
Okla. Cost 
42. Wister Lake, New Work 
Arkansas River Approp. 
Basin, Okla. Cost 
Maint. 
Approp. 
Cost 
47. Broken Bow Lake, New Work 
Red River Basin, Approp. 
Okla. Cost 
Maint. 
Approp. 
Cost 
48. Denison Dam-Lake New Work 
Texoma, Red River, Approp. 
Tex. & Okla. Cost 
Maint. 
Approp. 
Cost 
Minor Rehab. 
Approp. 
Cost 
49. Eufaula Lake, New Work 
Canadian River, Approp. 
Okla. Cost 
Maint. 
Approp. 
Cost 
50. Fort Gibson Lake, New Work 
Arkansas River Approp. 
Basin, Okla. Cost 
Maint. 
Approp. 
Cost 
51. Keystone Lake, New Work 
Arkansas River, Approp. 
Okla. Cost 
Maint. 
Approp. 
Cost 
52. Lake Hudson, New Work 
Arkansas River Approp. 
Basin, Okla. Cost 
53. Pensacola Lake, New Work 
Arkansas River Approp. 
Basin, Okla. Cost 
Maint. 
Approp. 
Cost 
160,000 
108,301 
81,000 
80,252 
185,000 
182,362 
132,000 
126,288 
9,255,000 
8,9 72,307 
2,677 
32,254 
846,300 
934,052 
100,000 
134,635 
870,000 
843,296 
47,773 
62,051 
634,900 
584,977 
4,395,000 
4,500,700 
574,500 
539,745 
12,800 
12,487 
107 
36,201 
98,000 
104,561 
220,840 
236,149 
162,000 
161,764 
4,930,000 
5,062,373 
275,000 
167,755 
944,500 
942,500 
305,000 
168,342 
911,500 
903,102 
95,500 
96,613 
583,500 
671,670 
3,329,450 
3,415,581 
612,000 
637,657 
11,000 
12,535 
5,000 
24,892 
125,500 
104,299 
500,000 
161,364 
179,800 
146,750 
3,500,000 
3,759,396 
104,800 
88,281 
500 
891 
1,057,100 
1,004,520 
-1,784 
133,659 
976,500 
1,013,454 
4,891 
8,860 
726,400 
687,883 
1,570,000 
1,051,048 
719,900 
710,639 
13,200 
13,202 
- 604,982 
60 604,578 
- 13,894,002 
- 13,894,002 
123,137 1,051,563 
140,612 1,044,742 
-23,700 957,140 
141,155 776,301 
- 10,501,226 
- 10,501,226 
167,827 2,183,827 
198,358 2,167,906 
2,318,000 40,490,032 
2,058,694 40,161,055 
263,889 368,689 
241,129 329,410 
115,000 67,493,9232 
187,547 67,459,4882 
1,145,787 15,231,443 
1,149,010 15,144,106 
- 46,237 
- 46,237 
80,000 121,381,1173 
81,703 121,338,687 
1,085,212 5,230,612 
1,047,024 5,115,274 
21,708 42,310,4784 
94 42,288,3924 
768,218 8,238,2565 
718,992 8,128,0025 
22,400 122,737,843 
808,485 122,626,910 
895,576 3,525,479 
873,888 3,427,175 
- 6,908,756 
- 6,908,756 
- 52,126 
- 52,126 
14,216 144,599 
12,440 142,566 
595

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 19-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
54. Robert S. Kerr Lock New Work 
& Dam & Reservoir, Approp. 20,700,000 12,671,000 11,209,000 9,493,400 86,350,549 
Arkansas River, Cost 20,006,827 14,348,109 11,413,301 9,847,778 85,716,500 
Okla. 
55. Tenkiller Ferry New Work 
Lake, Arkansas Approp. 40,000 64,500 -2,891 - 23,489,4946 
River Basin, Cost 40,713 70,843 -35 - 23,489,494 
Okla. Maint. 
Approp. 442,500 446,500 518,300 514,482 5,407,671 
Cost 433,473 510,107 443,492 552,759 5,359,042 
56. Webbers Falls Lock New Work 
& Dam, Arkansas Approp. 10,600,000 12,765,000 12,800,000 10,318,300 56,355,769 
River, Okla. Cost 10,963,013 13,331,755 7,292,130 15,842,154 55,294,336 
1. Excludes $81,460 contributed funds and $1,348,816 
special funds. 
2. Includes $433,539 Emergency Relief funds. Excludes 
$1,256,068 from special contributed funds. 
3. Excludes $299,803 contributed funds and $13,211,728 
special funds. 
4. Excludes $134,919 contributed funds. Includes $49,581 
Public Works acceleration funds. 
5. Excludes $5,366,231 special funds. 
6. Excludes $946 contributed funds and includes $39,999 
Public Works acceleration funds. 
596

TABLE 19-B 
Acts 
October 23, 1962 
November 7, 1966 
July 24, 1946 
October 23, 1962 
July 3, 1958 
October 23, 1962 
October 23, 1962 
October 23, 1962 
October 23, 1962 
October 23, 1962 
October 27, 1965 
July 3, 1958 
July 3, 1958 
October 27, 1965 
July 24, 1946 
~---~- 
Documents 
597 
TULSA, OKLA., DISTRICT 
AUTHORIZING LEGISLATION 
Work Authorized 
ARKANSAS-RED RIVER CHLORIDE CONTROL, TEX, 
OKLA., AND KANS. (see section 6 of text) 
Construction of experimental water quality study projects 
near Estelline and Guthrie, Tex. 
Project for water quality control, designated as Part I. Actual 
construction of the Part I works not to be initiated until 
the related and supporting works of Part II have been 
authorized. 
BANK STABILIZATION AND CHANNEL RECTIFICATION 
OKLA. (see section 2 of text) 
Training dikes, cutoffs, revetments, and other channel work, 
in reach between Robert S. Kerr Dam Site and Ft. Smith, 
Ark. 
BIG HILL LAKE, VERDIGRIS RIVER BASIN, KANS. 
(see section 7 of text) 
Construction of reservoir for flood control, water supply, 
and recreation. 
BROKEN BOW LAKE, RED RIVER BASIN, OKLA. 
(see section 47 text) 
Construction of a flood control reservoir. 
Installation of hydroelectric power facilities. 
CANDY LAKE, VERDIGRIS RIVER BASIN, KANS. 
(see section 8 of text) 
Construction of reservoir for flood control and 
conservation. 
CLAYTON LAKE, RED RIVER BASIN, OKLA. 
(see section 11 of text) 
Construction of reservoir for flood control and 
conservation. 
COPAN LAKE, VERDIGRIS RIVER BASIN, OKLA. 
(see section 12 of text) 
Construction of reservoir for flood control and 
conservation. 
COW CREEK, KANS. (see section 14 of text) 
Improve 32 miles of existing channel. 
CRUTCHO CREEK, OKLA. (see section 15 of text) 
Improve 7 miles of existing channel and construct a diversion 
channel 7,000 feet long. 
DEQUEEN LAKE, RED RIVER BASIN, ARK. 
(see section 16 of text) " 
Construction of dam and appurtenant facilities for flood 
control and conservation. 
DIERKS LAKE, RED RIVER BASIN, ARK. 
(see section 17 of text) 
Construction of dam and appurtenant facilities for flood 
control and conservation. 
EL DORADO LAKE, ARKANSAS RIVER BASIN, KANS. 
(see section 18 of text) 
Construction of reservoir to provide flood control and 
conservation. 
EUFAULA LAKE, CANADIAN RIVER, OKLA. 
(see section 49 of text) 
Construction of reservoir for flood control, hydroelectric 
power, navigation and conservation. 
S. Doc. 105, 87th Cong., 
2d Sess. 1 
S. Doc. 110, 89th Cong., 
2d Sess.1 
H. Doc. 758, 79th Cong., 
2d Sess. 1 
H. Doc 572, 87th Cong., 
2d Sess. 
H. Doc. 170, 85th Cong., 
1st Sess. 
H. Doc. 758, 79th Cong., 
2d Sess. 
H. Doc. 563, 87th Cong., 
2d Sess. 1 
S. Doc. 145, 87th Cong., 
2d Sess. 1 
H. Doc. 563, 87th Cong., 
2d Sess. 1 
H. Doc. 531, 87th Cong., 
2d Sess. 1 
S. Doc. 47, 89th Cong., 
1st Sess.1 
H. Doc. 170, 85th Cong., 
1st Sess. 1 
H. Doc. 170, 85th Cong., 
1st Sess.1 
H. Doc. 232, 89th Cong., 
1st Sess. 1 
H. Doc. 758, 79th Cong., 
2d Sess.1

TABLE 19-B (Continued 
Acts 
July 3, 1958 
July 24, 1946 
May 17, 1950 
February 15, 1958 
October 27, 1965 
October 23, 1962 
May 17, 1950 
October 23, 1962 
July 24, 1946 
July 3, 1958 
July 24, 1946 
June 28, 1938 
July 24, 1946 
June 22, 1936 
October 23, 1962 
July 3, 1958 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
I) AUTHORIZING LEGISLATION 
Work Authorized 
GILLHAM LAKE, RED RIVER BASIN, ARK. 
(see section 22 of text) 
Construction of dam and appurtenant facilities for flood H. I 
control and conservation. Ist 
HUGO LAKE, KIAMICHI RIVER, OKLA. 
(see section 24 of text) 
Construction of a flood control reservoir. H. I 
2d 
JOHN REDMOND DAM AND RESERVOIR, 
GRAND (NEOSHO) RIVER BASIN, KANS. 
(see section 26 of text) 
Construction of reservoir. H. I 
2d 
Renaming dam and reservoir to John Redmond Dam and Reservoir. P.L 
Establish a National Wildlife Refuge. S. D 
lst 
KAW LAKE, ARKANSAS RIVER, OKLA. (see section 27 of text) 
Construction of dam and appurtenant facilities. S. D 
2d 
KEYSTONE LAKE, ARKANSAS RIVER BASIN, OKLA. 
(see section 51 of text) 
Construction of reservoir for flood control, hydroelectric S. D 
power, navigation, and water supply. Ist 
LAKE KEMP, WICHITA RIVER, TEX. (see section 28 of text) 
Reconstruct and expand existing non-Federal reservoir. S. D 
2d 
LOW HEAD LOCKS & DAMS (see section 3 of text) 
Construction of three Lock & Dam Units, including turning H. I 
basin, channel cutoffs and enlargement to provide a 2d 
navigable channel 9 feet deep with a minimum width of 250 
feet from Ft. Smith, Ark. to vicinity of Catoosa, Okla. 
LUKFATA LAKE, RED RIVER BASIN, OKLA. 
(see section 29 of text) 
Construction of dam and appurtenant facilities. H. I 
Ist 
MAINTENANCE & REPAIR FLEET & MARINE TERMINAL 
(see section 4 of text) 
Wharf, office and storage building, storage space, and H. I 
operating areas for floating maintenance and repair fleet. 2d 
OOLOGAH LAKE, ARKANSAS RIVER BASIN, OKLA. 
(see section 32 of text) 
Construction of reservoir for flood control, navigation, and Floc 
water supply. 75 
Installation of hydroelectric power facilities. H. I 
2d 
OPTIMA LAKE, NORTH CANADIAN RIVER, OKLA. 
(see section 33 of text) 
Construction of reservoir for flood control, irrigation, H. I 
recreation, and conservation. 1sl 
PAT MAYSE LAKE, RED RIVER BASIN, TEX. 
(see section 34 of text) 
Construction of reservoir for flood control and conservation. H. I 
Is 
PINE CREEK LAKE, RED RIVER BASIN, OKLA. 
(see section 35 of text) 
Construction of reservoir for flood control and conservation. H. I 
Isi 
Documents 
Doc. 170, 85th Cong., 
t Sess. 
1 
)oc. 602, 79th Cong., 
Sess. 1 
Doc 442, 80th Cong., 
Sess. 1 
.85-327. 
)oc. 27, 89th Cong., 
t Sess. 
)oc. 143, 87th Cong., I Sess. 1 
)oc. 107, 81st Cong., 
t Sess.1 
)oc. 144, 87th Cong., 
I Sess. 
1 
Doc. 758, 79th Cong., 
I Sess.1 
Doc. 170, 85th Cong, 
t Sess. I 
Doc 758, 79th Cong., I Sess. 1 
od Control Com., Doc. 1, 
5th Cong., 1st Sess. 
Doc. 758, 79th Cong., 
I Sess. 
Doc. 308, 74th Cong., 
t Sess. 
Doc. 71, 88th Cong., 
t Sess. 
Doc. 170, 85th Cong., 
t Sess. l 
598

TABLE 19-B (Continued) 
Acts 
July 24, 1946 
August 3, 1955 
October 23, 1962 
August 13, 1968 
July 24, 1946 
October 27, 1965 
October 23, 1942 
December 30, 1963 
July 24, 1946 
TULSA, OKLA., DISTRICT 
AUTHORIZING LEGISLATION 
Work Authorized 
RED RIVER BELOW DENISON DAM (TULSA DISTRICT) 
(see section 37 of text) 
Construct Boswell Lake. 
Brown Creek and Walnut Bayou Channel Improvements. 
Construct Tuskahoma Lake. 
Modify 1946 Act - Construct bank stabilization, Index, Ark. to 
Denison Dam. 
ROBERT S. KERR LOCK & DAM NO. 15, ARKANSAS 
RIVER, OKLA. (see section 54 of text) 
Construction of dam, powerplant, navigation lock, and 
appurtenant facilities. 
SHIDLER LAKE, ARKANSAS RIVER BASIN, OKLA. 
(see section 38 of text) 
Construction of flood control reservoir. 
SKIATOOK LAKE, VERDIGRIS RIVER, OKLA. 
(see section 39 of text) 
Construction of flood control reservoir. 
WAURIKA LAKE, RED RIVER BASIN, OKLA. 
(see section 41 of text) 
Construction of reservoir for flood control, irrigation, 
and conservation. 
WEBBERS FALLS LOCK & DAM NO. 16, ARKANSAS 
RIVER BASIN, OKLA. (see section 56 of text) 
Construction of dam, powerplant, navigation lock, and 
appurtenant facilities. 
Documents 
H. Doc 602, 79th Cong., 
2d Sess. 1 
H. Doc. 488, 83d Cong., 
2d Sess. 1 
S. Doc. 145, 87th Cong., 
2d Sess. 1 
H. Doc. 304, 90th Cong., 
2d Sess. 1 
H. Doc. 758, 79th Cong., 
2d Sess. 
H. Doc. 242, 89th Cong., 
1st Sess. 1 
H. Doc. 563, 87th Cong., 
2d Sess. 1 
S. Doc. 33, 88th Cong., 
1st Sess. 
H. Doc. 758, 79th Cong., 
2d Sess. 1 
1. Contains latest published maps. 
2. Hydroelectric power features considered inactive, because 
under present criteria power is not justified and they are 
excluded from present plan of improvement. 
599

TABLE 19-C 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
ARKANSAS RIVER BASIN: MULTIPLE-PURPOSE PLAN 
(See Section 1 of Text) 
Feature River River Mile Nearest Town 
Locks and Dams: 
W. D. Mayo, No. 14 Arkansas 375.0 Redland, Okla. 
Robert S. Kerr, No. 15 Arkansas 395.4 Cowlington, Okla. 
Webbers Falls, No. 16 Arkansas 432.2 Gore, Okla. 
Chouteau, No. 17 Verdigris 9.6 Okay, Okla. 
Newt Graham, No. 18 Verdigris 35.5 Inola, Okla. 
Appurtenant Navigation Features: 
Channel cutoffs and Verdigris 1 Muskogee to Catoosa, Okla. 
enlargements 
Dredging Arkansas 1 
Bank stabilization and Arkansas 395.4 to Fort Smith, Ark., to Robert S. Kerr 
channel rectification 362 Lock and Dam 
Robert S. Kerr Marine 
Terminal Arkansas 402 Sallisaw, Okla. 
Lakes: 
Keystone Arkansas 539 Sand Springs, Okla. 
Eufaula Canadian 27 Eufaula, Okla. 
Oologah Verdigris 90 Oologah, Okla. 
Toronto Verdigris 271 Toronto, Kans. 
Neodesha2 Verdigris 223 Neodesha, Kans. 
Elk City (Table Mound) Elk River 9 Elk City, Kans. 
Pensacola Grand (Neosho) 77 Disney, Okla. 
Lake Hudson Grand (Neosho) 47 Locust Grove, Okla. 
Fort Gibson Grand (Neosho) 8 Fort Gibson, Okla. 
Tenkiller Illinois 13 Vian, Okla. 
Wister Poteau 61 Wister, Okla. 
Canton North Canadian 394 Canton, Okla. 
Fall River Fall River 54 Fall River, Kans. 
1. As required for channel 9 feet deep. 
2. See "Other authorized flood control projects." 
600

TULSA, OKLA., DISTRICT 
TABLE 19-D ARKANSAS-RED RIVER CHLORIDE CONTROL: 
PART I, WICHITA RIVER CHLORIDE CONTROL PLAN 
(See Section 6-C of Text) 
Low Flow Brine Low Flow Low Flow Brine 
Reservoir Reservoir Reservoir Reservoir Reservoir 
Feature (Area VII) (Area VII) (Area VIII) (Area X) (Areas VIII & X) 
Stream North Fork Canal South Fork Middle Fork Trib. to N. Fork 
Wichita Riv. Creek Wichita Riv. Wichita Riv. Wichita Riv. 
River mile 209 1.6 60.8 3.1 191.3 
County Cottle Foard King Foard Knox 
Nearest town Stewart Crowell Benjamin Foard City Truscott 
Drainage area, 
square miles 489 46 440 161 29 
Dam: 
Height, feet 38 137 33 41 140 
Length, feet 650 17,500 3,100 1,260 13,800 
Uncontrolled spillway, 
width, feet 294 100 287 182 100 
Deflatable dam, 
height, feet 12 - 14 14 - 
Outlet works None 36-Inch pipe None None 36-inch pipe 
Storage, acre feet 
Maximum pool 7,400 235,000 5,320 4,035 202,500 
Top of deflatable dam 3,200 - 2,820 620 - 
Brine storage 2,500 167,1301 2,500 400 156,0001 
Area, acres: 
Maximum pool 710 5,870 600 500 7,100 
Top of deflatable dam 360 - 340 80 - 
Brine storage 360 4,9401 340 80 5,7501 
Pumping facility: 
Capacity, g.p.m. 9,000 - 9,000 9,000 
Pipeline, 36-inch, 
length, miles 13 - 9.5 5.8 
1. Includes 100-year event after 
brine. 
100 years accumulation of 
601

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
POOL ELEVATIONS AND STORAGES DURING FISCAL YEAR 
End Maximum Minimum 
9. Canton Lake, Arkansas River 
Basin, Okla. 
13. Council Grove Lake, Grand 
(Neosho) River Basin, Kans. 
19. Elk City Lake, Arkansas 
River Basin, Kans. 
20. Fall River Lake, 
Arkansas River Basin, Kans. 
21. Fort Supply Lake, 
North Canadian River, Okla. 
23. Great Salt Plains Lake, 
Arkansas River, Okla. 
25. Hulah Lake, Caney River, Okla. 
26. John Redmond Dam and Reservoir 
Grand (Neosho) River Basin, Kans. 
30. Marion Lake, Grand (Neosho) 
River Basin, Kans. 
31. Millwood Lake, Red River 
Basin, Ark. 
32. Oologah Lake, Arkansas 
River Basin, Okla. 
34. Pat Mayse Lake, Red River 
Basin, Tex. 
35. Pine Creek Lake, Red 
River Basin, Okla. 
36. Polecat Creek, Okla. 
(Heyburn Lake) 
40. Toronto Lake, Arkansas 
River Basin, Kans. 
42. Wister Lake, Arkansas 
River Basin, Okla. 
47. Broken Bow Lake, 
Red River Basin, Okla. 
48. Denison Dam - Lake Texoma, 
Red River, Tex. and Okla. 
49. Eufaula Lake, Canadian 
River, Okla. 
50. Fort Gibson Lake, Arkansas 
River Basin, Okla. 
51. Keystone Lake, Arkansas 
River, Okla. 
52. Lake Hudson, Arkansas 
River Basin, Okla. 
53. Pensacola Lake, Arkansas 
River Basin, Okla. 
55. Tenkiller Ferry Lake, 
Arkansas River Basin, Okla. 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.1.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
Elevation (feet m.s.l.) 
Storage (acre-feet) 
1,615.63 1,613.79 1,615.64 1,611.16 
121,926 105,200 122,000 86,640 
1,277.65 1,274.05 1,283.72 1,269.66 
63,340 50,750 88,340 37,340 
792.22 793.99 808.91 791.74 
35,400 42,100 128,980 33,720 
954.97 948.77 968.77 948.15 
43,880 24,620 111,200 23,080 
2,003.80 2,003.78 2,004.19 2,002.67 
14,180 14,150 14,930 12,260 
1,125.32 1,125.18 1,127.91 1,124.78 
40,280 39,340 67,820 35,580 
746.59 733.19 746.59 732.28 
106,600 35,360 106,600 32,120 
1,051.97 1,038.93 1,057.19 1,035.55 
255,220 81,460 357,790 53,020 
1,351.45 1,350.20 1,351.99 1,349.76 
92,570 84,750 96,090 82,100 
257.26 259.38 262.83 257.26 
152,290 210,260 325,140 152,290 
627.09 608.05 630.44 602.92 
285,700 58,320 356,200 33,930 
452.58 451.27 455.55 450.46 
134,200 126,200 153,510 121,300 
430.60 437.73 451.66 420.99 
31,160 52,750 126,930 13,880 
761.88 761.32 765.05 760.88 
8,550 7,990 12,220 7,590 
917.08 901.85 922.47 901.40 
88,650 22,810 125,170 21,630 
474.35 471.66 494.20 471.40 
42,635 30,187 262,300 29,160 
598.02 596.23 604.40 590.68 
897,230 872,410 989,310 798,150 
617.40 615.34 617.40 609.48 
2,768,700 2,590,100 2,768,700 2,129,900 
583.74 584.75 588.14 576.08 
2,249,650 2,350,590 2,712,940 1,583,590 
556.88 554.43 568.12 552.18 
422,880 373,370 715.740 331,740 
726.22 725.15 733.27 715.25 
751,228 720,900 972,530 480,000 
619.45 619.29 632.08 617.55 
205,230 203,470 375,590 184,890 
747.22 745.29 752.94 734.37 
1,777,800 1,685,600 2,076,600 1,234,300 
630.20 632.20 641.27 620.00 
631,200 656,700 781,200 512,100 
602 
TABLE 19-E 
See 
Section 
in Text Project Start

TULSA, OKLA., DISTRICT 
TABLE 19-F RED RIVER BELOW DENISON DAM FLOOD CONTROL PLAN (TULSA DIST.) 
(See Section 37 of Text) 
Reservoir River Site1 Nearest Town 
Boswell Lake2 Boggy Creek 18.9 Boswell, Okla. 
Tuskahoma Lake2 Kiamichi River 118.5 Tuskahoma, Okla. 
Clayton Lake3 Jackfork Creek 2.8 Clayton, Okla. 
Hugo Lake3 Kiamichi River 17.6 Hugo, Okla. 
Pine Creek Lake3 Little River 145.3 Wright City, Okla. 
Lukfata Lake3 Glover Creek 16.8 Glover, Okla. 
Broken Bow Lake3 Mountain Fork River 20.3 Broken Bow, Okla. 
DeQueen Lake3 Rolling Fork River 22.8 DeQueen, Ark. 
Gillham Lake3 Cossatot River 47.7 Gillham, Ark. 
Dierks Lake3 Saline River 57.0 Dierks, Ark. 
Millwood Lake3 Little River 16.0 Millwood, Ark. 
Bank Stabilization 2 Red River 485.3 Index, Ark. 
Bank Stabilization Red River 330.4 Index, Ark. 
Walnut Bayou2 Red River 509.2 Foreman, Ark. 
1. River mile above mouth. 
2. See "Other authorized flood control projects." 
3. Project is reported separately herein. 
TABLE 19-G INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 43 of Text) 
Inspection Dates 
Project 1969 1970 
Jenks Levee, Okla. March 
Tulsa-West Tulsa Levees, Okla. April 
Carthage Levee, Mo. - May 
Enid Diversion Channel and Levee, Okla. October 
Hutchinson Levee, Kans. - May 
Wichita and Valley Center, Kans. - April 
Augusta Levee, Kans. - June 
South Deer Creek Levee, Okla. - April 
Polecat Creek Channel Improvement, Okla. October 
Iola Levee, Kans. - May 
Florence Levee, Kans. - May 
Sand Creek Channel Improvement, Kans. July 
Walnut Bayou Channel Improvement, Ark. June 
Oklahoma City Floodway, Okla. - April 
Cherry and Red Fork Creeks, Okla. November 
Coffeyville Levee, Kans. June 
603

TABLE 19-H 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
SCHEDULING FLOOD CONTROL RESERVOIR OPERATIONS 
(See Section 44 of Text) 
Year 
Individual Projects Location Construction Agency Completed 
Pensacola Lake Grand (Neosho) River, Okla. Grand River Dam Authority, 1940 
State of Okla. 
Altus Dam and Reservoir North Fork of Red River, Okla. Bureau of Reclamation 1948 
Fort Cobb Dam and Reservoir Pond (Cobb) Creek, Okla. Bureau of Reclamation 1959 
Foss Dam and Reservoir Washita River, Okla. Bureau of Reclamation 1961 
Lake Hudson Grand (Neosho) River, Okla. Grand River Dam Authority 1964 
Norman Dam and Reservoir Little River, Okla. Bureau of Reclamation 1964 
Cheney Dam and Reservoir North Fork of Ninnescah River, Bureau of Reclamation 1965 
Okla. 
Lake Meredith Canadian River, Texas Bureau of Reclamation 1965 
Arbuckle Dam and Reservoir Rock Creek, Okla. Bureau of Reclamation 1967 
TABLE 19-J FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
Section 205 Public Law 858, 80th Congress, as amended (Preauthorization) 
(See Section 46 of Text) 
Fiscal Year 
Study Identification Cost 
Clear Creek, Pierce City, Mo. $ 8,331 
Deep Fork Creek, Okla. City, Okla. 5,798 
Flat Rock Creek, Tulsa, Okla. 14,400 
Frisco Creek, Hobart, Okla. 3,009 
Gypsum and Dry Creeks, Wichita, Kans. 26 
Joe Creek, Tulsa, Okla. 15,170 
Little Bear Creek, DeQueen, Ark. 639 
Lost Creek, Seneca, Mo. 23,914 
Main Branch Chisholm Creek, Wichita, Kans. 26 
Mud Creek, Idabel, Okla. 18,114 
Spring Creek, Springdale, Ark. 50,494 
Stillwater Creek and Tributaries, Stillwater, Okla. 12,813 
Sycamore Creek, Coffeyville, Kans. 18,532 
Turkey Creek, Bartlesville, Okla. 7 
Turtle Creek, Yukon, Okla. 28,165 
Washita River, Anadarko, Okla. 31,455 
Wellington, Tex. 1,944 
Whiskey and Rock Creeks, Independence, Kans. 43,515 
Yanubbee Creek, Broken Bow, Okla. 1,608 
604

TULSA, OKLA., DISTRICT 
TABLE 19-I OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Augusta, Kans.2 19381 
Birch Lake, Okla.5 1968 
Carthage, Mo.3 1958 346,416 
Cedar Point Lake, Kans.5 1966 
Douglass Lake, Kans.5 1966 
El Dorado, Kans. 5' 7 1966 
Enid, Okla.3 1963 743,612 
Florence, Kans.3 1965 369,781 
Hutchinson, Kans.3 1956 3,497,718 
Iola, Kans.3 1939 22,290 
Jenks, Okla.3 1950 344,797 
Neodesha Lake, Kans.4 1952 97,910 
Oklahoma City, Okla.3 1960 8,047,512 
Sand Creek, Kans.3 1968 495,615 
Sand Lake, Okla.5 1963 
South Deer Creek, Okla.3 1964 31,333 
Tulsa and West Tulsa, Okla.3 1954 2,785,070 
Towanda Lake, Kans.5 1966 
West Branch Chisholm Creek, Kans.3 1965 364,220 
Wichita and Valley Center, Kans.3 1960 12,247,379 
Winfield, Kans.2 19371 
Winfield, Kans.5 '7 1966 
Altus Reservoir, Okla.6 1942 
Bank Stabilization3 1953 222,105 
Big Pine Lake, Tex. s 1963 
Boswell Lake, Okla.5 1952 
Plum Creek, Tex.4 1966 
Tuskahoma Lake, Okla.5 1963 
Walnut Bayou, Ark. 3 1963 317,675 
1. Reported by Memphis District in 1937: by Little Rock 
District in 1938 and 1939. 
2. Completed by Kansas Works Progress Administration. 
3. Completed. 
4. Inactive. 
5. Awaiting appropriation of funds. 
6. Construction by Bureau of Reclamation, participation by 
Department of the Army to finance flood control portion is 
complete. 
7. Flood Control Act of 1965 (H. Doc. 232, 89th Cong., 
1st Sess.) authorized raising of existing levee and construction of 
new levee. 
605 
451-584 0-72-39

TABLE 19-K 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
DENISON DAM - LAKE TEXOMA: ESTIMATED COST 
(See Section 48 of Text) 
Facility Estimated Cost 
Initial development including 2 power units 
with provisions for ultimate installation of 
5 power units $64,941,0001 
Modification No. 2 - Additional public use 
facilities 4,016,000 
Installation of 3d power unit 10,780,000 
Modification No. 4 - Additional work 1,028,000 
$80,765,0002 
1. Including $1,212,000 for Willis Bridge and $434,000 for 
emergency relief work. 
2. Estimated Federal cost is $79,553,000 and non-Federal 
cost was $1,212,000. 
TABLE 19-L COMPLETED FLOOD PLAIN INFORMATION REPORTS 
(See Section 58 of Text) 
Date Federal 
Location Requesting Agency Completed Cost 
Grand (Neosho) River, Kansas Kansas Water Resources Board July 1966 $19,975 
Verdigris River, Kansas Kansas Water Resources Board April 1967 20,965 
Fort Smith, Arkansas (Mill Creek) City of Fort Smith, Ark. April 1968 16,509 
Stillwater, Oklahoma (Stillwater City of Stillwater, Okla. July 1968 22,274 
Creek and Tribs.) 
Walnut River, Kansas Kansas Water Resources Board Sept 1968 41,329 
Sherman, Texas (Post Oak Creek City of Sherman, Tex. March 1969 23,420 
& Tribs.) 
Miami, Oklahoma (Neosho River City of Miami, Okla. June 1969 21,969 
& Tar Creek) 
Tulsa, Oklahoma (Mingo Creek) City of Tulsa, Okla. March 1970 50,410 
Guthrie, Oklahoma (Cottonwood City of Guthrie, Okla. May 1970 21,814 
Creek) 
606

KANSAS CITY, MO., DISTRICT* 
This district comprises a portion of southwestern 
Iowa; northwestern, central, and western Missouri; 
northern Kansas; southern Nebraska; and a portion of 
northeastern Colorado embraced in drainage basin of 
the Missouri River and tributaries from Rulo, Nebraska, 
to the mouth. Report on navigation project for 
section of Missouri River from Sioux City, Iowa, to 
Rulo, Nebraska, is in report of Omaha District. 
IMPROVEMENTS 
Navigation Page 
1. Missouri River, Sioux City, Iowa, to 
mouth (Rulo, Nebr., to mouth) ...... 608 
2. Other authorized navigation projects .... 608 
Flood Control 
3. Atchison, White Clay Creek, Kans. ...... 608 
4. Bedford, East Fork 102 River, Iowa .... 609 
5. Brookfield Lake, Yellow Creek, Mo. .... 609 
6. Chariton-Little Chariton Basins, Mo. 
(1965 Act) ........................................ 609 
7. Chariton River, Mo. (1944 Act) .......... 610 
8. Clinton Lake, Wakarusa River, Kans. . 610 
9. Elk Creek, Clyde, Kans. ...................... 610 
10. Fairbury, Little Blue River, Nebr ....... 610 
11. Fort Scott Lake, Marmaton River, 
Kans. ........................................ 611 
12. Grove Lake, Soldier Creek, Kans ....... 611 
13. Gypsum, Gypsum Creek, Kans. ............. 611 
14. Harlan County Lake, Republican 
River, Nebr. ............ ....................... 611 
15. Harry S. Truman Dam and Reservoir, 
Osage River, Mo. ............................ 612 
16. Hays, Big Creek, Kans. ....................... 612 
17. Hillsdale Lake, Big Bull Creek, Kans. 613 
18. Kanopolis Lake, Smoky Hill Reservoir, 
Kans. ........................................ 613 
19. Kansas City, Kansas River, Kans. 
(1962 M od.) .......... ...................... .. 613 
20. Kansas Citys on Missouri and Kansas 
River, Mo. and Kans. ...................... 614 
21. Lawrence, Kansas River, Kans. ............. 614 
22. Little Blue River Channel 
Improvement, Mo ........................... 614 
23. Little Blue River Lakes, Mo. ................. 615 
24. Long Branch Lake, Little Chariton 
River Basin, M o. ............................... 615 
25. Melvern Lake, Osage (Marais des 
Cygnes) River, Kans. ........................ 615 
Flood Control (cont.) Page 
26. Merriam, Turkey Creek, Kans .............. 616 
27. Milford Lake, Republican River, Kans. 616 
28. Missouri River Levee System, Iowa, 
Nebr., Kans., and Mo. (Rulo, Nebr. 
to M outh) ..................................... 617 
29. Missouri River Basin (Kansas City 
District) ........................................ 617 
30. Onaga Lake, Kansas River, Kans. ....... 617 
31. Osawatomie, Pottawatomie Creek, 
Kans. .............. ......... ..................... 618 
32. Pattonsburg Lake, Grand River, Mo. .. 618 
33. Perry Lake, Delaware River, Kans. ..... 618 
34. Platte River, Mo., Channel 
Improvement ..................................... 619 
35. Pomme de Terre Lake, Pomme de 
Terre River, M o. ............................... 619 
36. Pomona Lake, One Hundred Ten Mile 
Creek, K ans. ..................................... 619 
37. Rathbun Lake, Chariton River, Iowa .. 620 
38. Smithville Channel, Little Platte River, 
Mo. ........................................ 620 
39. Smithville Lake, Little Platte River, 
Mo. ........................................ 621 
40. Stockton Lake, Sac River, Mo .............. 621 
41. Stonehouse Creek, Jefferson Co., Kans. 622 
42. Topeka, Kansas River, Kans. .............. 622 
43. Tuttle Creek Lake, Big Blue River, 
Kans. ........................................ 623 
44. Wilson Lake, Saline River, Kans ........ 623 
45. Inspection of Completed Flood Control 
Projects ........................................ 624 
46. Other Authorized Flood Control 
Projects ........................................ 624 
47. Flood Control Work under Special 
Authorization ................... .................. 624 
General Investigations 
48. 
49. 
Surveys ........................................ 624 
Collection and Study of Basic Data ..... 624 
* All cost and financial statements for projects are listed at the 
appear at the end of this chapter. 
end of this chapter. All other tables are referenced in text and also 
607

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
NAVIGATION 
1. MISSOURI RIVER, SIOUX CITY, 
IOWA, TO MOUTH (RULO, NEBR., 
TO MOUTH) 
Location. Jefferson, Madison, and Gallatin Rivers 
conjoin at Three Forks, Mont., to form Missouri River, 
which flows southeasterly 2,315 miles across or along 
seven States to Mississippi River, 17 miles above St. 
Louis. For description see page 1149, Annual Report 
for 1932. Practically entire length of section from 
Kansas City to mouth is within State of Missouri. 
Previous projects. For details see page 1891 of Annual 
Report for 1915, and pages 1153 and 1175 of Annual 
Report for 1938. 
Existing project. A channel of 9-foot depth and width 
not less than 300 feet, to be obtained by revetment of 
banks, construction of permeable dikes to contract and 
stabilize waterway, cutoffs to eliminate long bends, 
closing minor channels, removal of snags, and dredging 
as required. Section under improvement (mouth to 
upper end of Rulo Bend) is 514.8 miles long (adjusted 
mileage). Ordinary and extreme fluctuations of stage 
are 16 and 38 feet, respectively. Estimated cost for new 
work is $238,950,000 (July 1970), exclusive of amounts 
expended on previous projects. (See table 20-C for 
authorizing legislation and table 20-B for total cost of 
existing project to June 30, 1970.) 
Local cooperation. Project provides that cooperation 
from benefited localities may be required, in case a 
comprehensive plan is adopted by Congress, for an 
apportionment of expense, where any improvement 
confers special benefit; and receipt of contributions 
from private parties, to be expended with Government 
funds upon authorized works where such would be in 
interest of navigation, is authorized by 1915 River and 
Harbor Act. Secretary of the Army approved general 
principle of cooperative construction on Missouri River 
below Kansas City on basis that 25 percent of cost of 
any special installation shall be paid by the United 
States and 75 percent by local interests. Total 
contributed by local interests in cooperation with the 
United States from 1918 to June 30, 1964, was $675, 
663, of which $8,647 was returned to contributors. 
Local interests must share in cost of recreation facilities 
in accordance with provisions of the Federal Water 
Project Recreation Act of 1965. Local Interests have 
contributed $61,900 for cost sharing on construction of 
recreation in addition to construction portions of the 
facilities. 
Terminal facilities. Facilities for transferring grain, 
petroleum products, and other commodities are maintained 
at various locations on this section of the river. 
Facilities are listed in table 20-D. 
Operations and results during fiscal year. Regular funds, 
new work: Construction by contract of 87 dikes and 56 
dike extensions totaling 30,894 linear feet, 41 lengths of 
revetment totaling 13,653 linear feet, initiation of 
construction of 3 dikes and 6 dike extensions totaling 1, 
867 linear feet and 12 lengths of revetment totaling 6, 
884 linear feet at a total cost of $2,473,667. Engineering 
and design, supervision and administration and survey 
and layout of channel and bank stabilization works was 
accomplished at a cost of $186,303. Construction of 
recreation facilities on a cost sharing basis in accordance 
with Public Law 89-72 was continued at a 
cost of $8,839. Work consisted of construction of boat 
ramps and engineering for development of future 
facilities. Maintenance: Repair by contract of 80,559 
linear feet of dike, 138,487 linear feet of revetment; 
initiation of repair of 16 dikes totaling 4,553 linear feet 
and 24 lengths of revetment totaling 14,903 linear feet 
at a cost of $5,610,141. In addition, following work was 
accomplished by hired labor: repair of 25,062 linear 
feet of dikes, 66,308 linear feet of revetment, initiation 
of repair of two pieces of revetment totaling 1,260 
linear feet, at a cost of $1,543,833; removal of 1,156,933 
cubic yards of material from 12 localities by U.S. 
dredge Black and 104,500 cubic yards of material at two 
localities by mechanical grader at a cost of $593,053; 
real estate management, $2,856; surveys and mapping, 
$533,574; stream gaging and special working data, 
$324,136; engineering and design, $280,482; surveys 
and layout of construction, $65,958; and supervision 
and administration, $933,806. Income from grants and 
miscellaneous receipts totaled $218. Proceeds of $1,442 
from the sale of maps and charts and outleasing of 
reservoir land were deposited in the U.S. Treasury. 
Local governmental units will be paid 75 percent of the 
income of $590 from lease rentals. 
Condition at end of fiscal year. Work on this section of the 
project (Rulo, Nebr., to mouth) is about 84 percent 
complete. Although additional dikes and revetment are 
required to attain full project dimensions, a channel 
with a minimum depth of 7.5 feet is available 
throughout the navigation season (generally Mar. thru 
Nov.). River access sites have been completed at five 
locations as follows: Leavenworth Park, mile 397.7, 
River Front Park, mile 363.0; La Benite Park, mile 
353.0; Miami River Front Park, mile 263.0 and Stump 
Island at Glasgow, mile 26.0. Planning for construction 
of additional recreational facilities is progressing. 
2. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 20-E.
FLOOD CONTROL 
3. ATCHISON, WHITE CLAY CREEK, 
KANS. 
Location. On White Clay Creek, a tributary of 
Missouri River in Atchison, Atchison County, Kansas. 
Existing project: Consists of a cut and cover conduit for 
White Clay Creek about 2,500 feet long under Main 
Street of city of Atchison, Kansas, to empty into 
Missouri River. Project authorized in 1962 Flood 
Control Act (S. Doc. 151, 87th Cong., 2d sess.). 
Estimated Federal cost of construction (1970) is $4,050, 
000 and estimated non-Federal cost of lands and 
damages is $287,000. 
608

KANSAS CITY, MO., DISTRICT 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. All required assurances and rights-ofway 
were furnished. 
Operations and results during fiscal year. Regular funds, 
new work: Construction of conduit was advanced to 99 
percent of completion and modification of the Missouri 
Pacific Railroad bridge was advanced to 68 percent of 
completion. Alteration of Santa Fe Railroad tracks has 
been essentially completed. 
Condition at end of fiscal year. Construction of the 
project was initiated July 19, 1967. Construction of 
conduit was 99 percent complete, Chicago, Burlington 
& Quincy Railroad track alterations were complete 
and modification of the Missouri Pacific Railroad 
bridge was 68 percent complete. Alteration of Santa Fe 
Railroad tracks was essentially complete. 
4. BEDFORD, EAST FORK 102 RIVER, 
IOWA 
Location. At Bedford, Taylor County, Iowa, on right 
bank of East Fork One Hundred and Two River, 
tributary of Platte River, 8 miles north of Missouri- 
Iowa State line. 
Existing project. Improvements previously constructed 
consist of channel and floodway improvement by 
clearing and excavating existing channel. Project was 
authorized for construction by Chief of Engineers on 
April 23, 1965, under authority of Section 205, 1948 
Flood Control Act, as amended. Estimated Federal cost 
of construction, including remedial work, is $502,000 
and estimated non-Federal cost of lands, damages, and 
relocations is $29,500. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Rights-of-way furnished by city of, 
Bedford. 
Operations and results during fiscal year. Regular funds,, 
new work: Preparation of operation and maintenance 
manual and recoid rdrawings on the original project, 
including letter design memorandum on rehabilitation 
of channel, by hired labor, cost $5,946. 
Condition at end of fiscal year. Construction of the 
original project was initiated September 8, 1966, 
completed October 10, 1967, and the project was 
transferred to the city of Bedford on November 29, 
1967. At years end construction by contract was 
completed at total cost of $395,875. Preparation of 
manuals and record drawings for the original project 
was complete. A letter design memorandum on 
rehabilitation of the channel, which was damaged by 
high flows in April 1969, was 20 percent complete. The 
total cost of constructing the Federal portion of the 
original project was $465,178. Total Federal cost at 
years end was $467,335. 
5. BROOKFIELD LAKE, YELLOW 
CREEK, MO. 
Location. Damsite is on Yellow Creek, a tributary of 
the Grand River, about 5 miles northeast of Brookfield, 
in Linn County, Missouri. 
Existing project. Preliminary plan provides for an 
earthfill dam about 4,800 feet long and approximately 
90 feet high with an uncontrolled service spillway in 
the right abutment. Total reservoir storage capacity 
would be 215,600 acre-feet, of which 117,200 acre-feet 
would be available for flood control, 20,900 acre-feet 
for sediment reserve and 77,500 acre-feet of conservation 
storage for water quality control and recreation. 
Project was authorized by the 1965 Flood 
Control Act (H. Doc. 241, 89th Cong., 1st sess.). 
Estimated cost (1970) is $17,700,000. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies. Local interests are required to share 
in cost of recreation facilities in accordance with 
Federal Water Project Recreation Act of 1965. 
Condition at end of fiscal year. No operation to date. 
6. CHARITON-LITTLE CHARITON 
BASINS, MO. (1965 ACT) 
Location. Project is in Chariton and Little Chariton 
River basins in north-central Missouri, the Mussel 
Fork unit is in Chariton County, the Little Chariton 
River unit in Chariton and Randolph Counties, and 
Shoal Creek unit in Putnam County. 
Existing project. Plans provide for improving and 
realining Little Chariton River channel downstream 
from the confluence of the East Fork and Middle Fork 
of the Little Chariton River. Middle and East Forks of 
Little Chariton River and lower 2 miles of Silver Creek, 
a tributary of East Fork, would be improved by 
realining and enlarging existing channel for a total of 
about 51 miles. Channel of Mussel Fork, a tributary of 
Chariton River would be straightened and improved 
for about 23 miles. Lower 5 miles of Shoal Creek would 
be shortened to about 2 miles by construction of a cutoff 
to new Chariton River channel constructed under a 
previous project. Project was authorized by 1965 Flood 
Control Act (H. Doc. 238, 89th Cong., 1st sess.). 
Estimated cost (1970) is $8,720,000, of which $7,350, 
000 is Federal and $1,370,000 for lands, damages, and 
relocation to be borne by local interests. 
Local cooperation. Section 3, Flood Control Act of June 
28, 1938, applies. Three drainage districts have been 
organized to sponsor the three separate units. The 
Shoal Creek Drainage District, Mussel Fork Drainage 
District, and Little Chariton Drainage District have all 
given formal assurances of intent to cooperate. Shoal 
Creek Drainage District is ready to furnish rights-ofway 
and will sell bonds as soon as construction funds 
are released. Little Chariton Drainage District has 
filed Plan for Reclamation with the Circuit Court and 
rights-of-way acquisition will be completed for the 
initial contract during 1971. Mussel Fork has been 
furnished right-of-way requirements and they are now 
preparing their Plan for Reclamation. 
Operations and results during fiscal year. Regular funds, 
new work: Design memorandums for Little Chariton 
River channel improvement were completed. Total 
costs for all hired labor work were $3,483. 
Condition at end of fiscal year. Preparation of design 
memorandums was completed. Construction plans for 
Shoal Creek channel improvement have been completed. 
609

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
7. CHARITON RIVER, MO. (1944 ACT) 
Location. Rises near Osceola in south-central Iowa 
and flows easterly and southeasterly about 140 miles to 
Iowa-Missouri State line, thence south about 138 miles 
to its confluence with Missouri River about 7 miles 
above Glasgow, Missouri. Drainage basin of Chariton 
River is about 150 miles long and 25 miles wide. 
Existing project. Intermittent channel enlarging and 
straightening Chariton River from near Missouri-Iowa 
line to confluence of Chariton and Missouri Rivers, 
together with tieback levees across Missouri flood plain 
along with improved channel, a levee along Missouri 
River from mouth of Chariton to mouth of Little 
Chariton River, and a tieback levee and channel 
improvement along Little Chariton River across 
Missouri River flood plain. Existing project was 
authorized by 1944 Flood Control Act (H. Doc. 628, 
78th Cong., 2d sess.). Estimated cost of project (1970) is 
$9,235,000, of which $8,500,000 is for Federal costs for 
construction and $735,000 is cost of lands and damages 
to be borne by local interests. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. All rights-of-way have been furnished. 
Operations and results during fiscal year. Regular funds, 
new work: Construction of tieback levees along the new 
channel of the Chariton River was essentially completed 
by contract at a cost of $247,671. Construction of 
tieback levees and channel improvements along the 
Little Chariton River was advanced 10 percent to 96 
percent of completion at a cost of $164,448. Construction 
of main stem levees along the Missouri River 
was initiated and advanced to 35 percent complete at a 
cost of $890,997. 
Condition at end of fiscal year. Construction of project 
was initiated in February 1948. Construction of cutoffs 
enlarging Chariton River channel from mile 13.6 to 
mouth and construction of revetment and bank 
protection at mouth is complete. Construction of 
cutoffs, enlarging, and clearing of Chariton River 
channel from mile 13.6 to 19.9 in upper Chariton 
County unit is complete. Construction of ditches, 
cutoffs, and enlarging and clearing of Chariton River 
channel in Macon-Adair Counties and Reinhart 
Ranch units is complete. Levees along the new channel 
to Chariton River at its mouth are 96 percent 
complete. Construction of tieback levees along the 
Little Chariton River across Missouri River flood plain 
is 100 percent complete. Main stem levees between 
Chariton and Little Chariton Rivers is 35 percent 
complete. 
8. CLINTON LAKE, WAKARUSA RIVER, 
KANS. 
Location. Damsite is on Wakarusa River about 4 miles 
southwest of Lawrence, Kansas, in Douglas County. 
Lake extends into Shawnee and Osage Counties, 
Kansas. 
Existing project. Plans provide for an earthfill dam 
about 9,250 feet long to be constructed to an average 
height of about 85 feet, with an uncontrolled spillway 
in left abutment. Total reservoir storage capacity 
would be 397,200 acre-feet (258,300 for flood control, 
28,500 for sediment reserve, and 110,400 of multipurpose 
storage for municipal and industrial water 
supply and recreation). Estimated Federal" cost of 
construction (1970) is $44,200,000. Local interests will 
be required to make reimbursement for water supply 
storage in the estimated amount of $6,050,000. Project 
authorized by 1962 Flood Control Act (S. Doc. 122, 
87th Cong., 2d sess.). 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies. Reimbursement will be required for 
water supply storage to be provided in accordance with 
Water Supply Act of 1958. 
Operations and results during fiscal year. Regular funds, 
new work: Land acquisition consisted of 1,989 acres in 
fee and 6 acres flowage easements at a cost of $1,033, 
780. Hired labor operations consisted of real estate 
management, continuation of work on plans and 
specifications for the embankment and spillway and 
outlet works and supervision and administration at a 
cost of $190,359. 
Condition at end of fiscal year. 2,346 acres of land, 
including the town of Richland, Kansas, have been 
acquired in fee and flowage easements acquired for 6 
acres. Plans and specifications for the embankment 
and spillway and outlet works were 20 percent 
complete. 
9. ELK CREEK AT CLYDE, KANS. 
Location. At Clyde, Cloud County, Kansas, on the 
right bank of Elk Creek about one mile north and west 
of its confluence with the Republican River, and about 
15 miles east of Concordia, Kansas. 
Existing project. Improvements previously constructed 
consist of a levee along the north and east side of the 
city to tie into high ground, and channel improvement 
work. Project was selected for construction under 
authority of Section 205, 1948 Flood Control Act, as 
amended. Estimated Federal cost of construction, 
including remedial work, is $534,000. Non-Federal 
costs of lands, damages and relocations were $176,000. 
Local cooperation. Section 3, Flood Control Act of June 
2, 1936, applies. All rights-of-way have been furnished. 
Operations and results during fiscal year. Regular funds, 
new work: Preparation of a supplemental detailed 
project report by hired labor, cost $773. The report 
covers remedial measures to rehabilitate the previously 
completed project due to deteriorated riprap and 
degradated channel. 
Condition at end of fiscal year. Construction of the 
original project was completed in August 1963 at a 
total Federal cost of $394,028. A supplemental detailed 
project report covering rehabilitation of the project was 
55 percent complete. 
10. FAIRBURY, LITTLE BLUE RIVER, 
NEBR. 
Location. At Fairbury, Jefferson County, Nebraska, 
on left bank of Little Blue River about 13 miles above 
Kansas-Nebraska State line. 
610

KANSAS CITY, MO., DISTRICT 
Existing project. Plan consists of levees, floodwalls, and 
drainage structures. Project was authorized for construction 
by the Chief of Engineers on March 10, 1966, 
under Section 205, 1948 Flood Control Act, as 
amended by Public Law 87-874. Estimated Federal 
cost of construction (1970) is $534,000 and estimated 
non-Federal cost of lands, damages, and relocations is 
$20,000. 
Local cooperation. City Council, on June 18, 1963, gave 
assurances that city would comply with requirements. 
Section 3, Flood Control Act of June 22, 1936, applies. 
All rights-of-way have been furnished. 
Operations and results during fiscal year. Regular funds, 
new work: Construction of levees and floodwalls by 
contract, 95 percent complete. 
Condition at end offiscalyear. Construction of levees and 
floodwalls, initiated July 29,1968, was underway. 
11. FORT SCOTT LAKE, MARMATON 
RIVER, KANS. 
Location. Damsite is on Marmaton River about 55 
miles above its mouth and about 6 miles southwest of 
Fort Scott, Bourbon County, Kansas. 
Existing project. Plans provide for a dam about 7,200 
feet long to be constructed to an elevation about 75 feet 
above valley floor, with an uncontrolled spillway. Total 
reservoir storage capacity would be 235,500 acre-feet 
(149,000 for flood control, 12,500 for sediment reserve, 
and 74,000 of multipurpose storage for water supply, 
water quality control, fish and wildlife, and recreation). 
Local interests will be required to make reimbursement 
for water supply storage in the estimated 
amount of $576,000. Project is a unit of general 
comprehensive plan for flood control and other 
purposes in Missouri River basin, authorized by 
Control Act of 1954 (H. Doc. 549, 81st Cong., 2d sess.). 
Estimated cost (1970) is $27,500,000. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations and results during fiscal year. Regular funds, 
new work: Preparation of the real estate acquisition 
design memorandum was continued by hired labor at a 
cost of $3,313. 
Condition at end offiscalyear. Preconstruction planning 
is complete and contract plans for the initial construction 
contracts are complete. 
12. GROVE LAKE, SOLDIER CREEK, 
KANS. 
Location. Damsite is on Soldier Creek about 7 miles 
northwest of Topeka, Kansas, in Shawnee County, 
with lake extending upstream into Jackson County. 
Existing project. Preliminary plans provide for an 
earthfill dam about 12,000 feet long and about 90 feet 
high, with an uncontrolled flat crest spillway. Total 
reservoir storage capacity would be 342,420 acre-feet 
(189,160 for flood control, 29,000 for sediment reserve, 
and 124,260 of multipurpose storage for water supply 
and recreation). Local interests will be required to 
make reimbursement for water supply storage in the 
estimated amount of $6,902,000. Project authorized by 
1962 Flood Control Act (S. Doc. 122, 87th Congress, 2d 
sess.). Estimated cost of construction (1970) is $42,300, 
000. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies. The city of Topeka, Kansas, has 
furnished assurances for water supply storage to be 
provided in accordance with Water Supply Act of 
1958. 
Operations and results during fiscal year. Regular funds, 
new work: Work was deferred in FY 1970 awaiting 
approval of downstream site and appropriation of 
additional funds. 
Condition at end of fiscal year. Surveying and mapping, 
design memorandums for hydrology, site selection, 
general project development, administrative facilities, 
access roads and cost allocation are complete. 
13. GYPSUM, GYPSUM CREEK, KANS. 
Location. At Gypsum, Saline County, Kansas, on the 
left bank of Gypsum Creek, 10 miles south of its 
confluence with Smoky Hill River, 15 miles southeast 
of Salina, Kansas. 
Existing project. Plan consists of a levee around the 
city, a diversion channel, and channel improvement 
work. Project is being considered for selection under 
Section 205, 1948, Flood Control Act, as amended by 
Public Law 87-874. Estimated Federal cost of construction 
(1970) is $1,000,000, and estimated non- 
Federal cost of lands, damages, and relocations is $320, 
000. 
Local cooperation. City Council adopted a resolution of 
intent to sponsor the project on January 3, 1966. 
Section 3, Flood Control Act of June 22, 1936, applies. 
The city of Gypsum has expended funds on planning its 
share of project costs, implemented work toward 
acquisition of rights-of-way, and received commitments 
from the county and State Highway Commission 
for construction and alterations of highway 
bridges involved. Assurance of the required abc's has 
been received from the city of Gypsum. 
Operations and results during fiscal year. Regular funds, 
new work: The detailed project report was completed 
and submitted to higher authority. 
Condition at end of fiscal year. Detailed project report is 
complete. Project approval has been requested. Preauthorization 
studies to date cost $65,503. 
14. HARLAN COUNTY LAKE, 
REPUBLICAN RIVER, NEBR. 
Location. Dam is on main stem of Republican River 
about 235 miles above confluence of stream with 
Smoky Hill River. Site is in Harlan County, about 3 
611

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
miles east of Republican City and 13 miles west of 
Franklin, Nebraska. 
Existing project. An earthfill dam about 107 feet above 
streambed and a total length of 11,827 feet, including a 
gate-controlled concrete gravity-type spillway section 
near center of dam, impounds floodwater within 
reservoir which provides storage capacity of 850,000 
acre-feet (500,000 for flood control and 350,000 for 
irrigation and sedimentation allowance). Project is a 
unit of general comprehensive plan for flood control 
and other purposes in Missouri River basin authorized 
by 1938 Flood Control Act (Flood Control Committee 
Doc. 1, 75th Cong., 1st sess.), as modified by 1941 Flood 
Control Act (H. Doc. 842, 76th Cong., 3d sess.), to 
include this project, and expanded by 1944 Flood 
Control Act (H. Doc. 475, and S. Docs. 191 and 247, 
78th Cong., 2d sess.). Estimated cost (July 1970) is $46, 
935,353, including $1,017,623 for major rehabilitation 
and $614,000 Code 710 funds (recreation at completed 
projects). 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operation and results during fiscal year. Regular funds, 
new work: Installed by hired labor: Trailer service 
station, and boat dock in Hunters Cove area; boat dock 
in Gremlin Cove area; and boat dock in the Methodist 
Cove area at a cost of $1,912. Regular Maintenance: 
Maintenance work by contract and hired labor 
consisted of purchase and installation of pumps in 
gallery drains, $6,839; a high order alinement and 
tilting survey of the dam, $29,425; and road maintenance, 
$16,608. A landfill bulldozer was procured at 
a cost of $27,310. Purchase of a mower and miscellaneous 
office, grounds, reservoir, garage, and shop 
equipment cost $2,161. Routine operation, ordinary 
maintenance, real estate management services, supervision 
and administration cost $196,814. Income 
from sale of water and collections for subsistence, 
quarters, services, etc., totaled $3,477. Proceeds from 
rentals of reservoir lands and recreational fees of $61, 
681 were deposited in the U.S. Treasury. Local 
governmental units will be paid 75 percent of the $60, 
457 received from lease rentals. 
Condition at end of fiscal year. Construction of project 
was initiated in August 1946 and construction of 
embankment and gravity spillway section was completed 
December 1952. Construction of supplemental 
recreation facilities is underway. 
15. HARRY S. TRUMAN DAM AND 
RESERVOIR, OSAGE RIVER, MO. 
Location. Damsite is on main stem of Osage River 
about 1.5 miles northwest of Warsaw, Benton County, 
Missouri. Reservoir extends into Bates, Henry, Hickory, 
St. Clair, and Vernon Counties, Missouri. 
Existing project. Provides for an earthfill dam about 5, 
000 feet long to be constructed to an average height of 
about 96 feet, including a gate-controlled overfall 
spillway section and a power installation consisting of 
six inclined pump-generating units with capacity of 
160,000 kilowatts. Reservoir storage capacity would be 
5,202,000 acre-feet (3,918,000 for flood control, 244, 
000 for sediment reserve and 1,040,000 multipurpose 
storage for power, low-flow regulation and recreation). 
This project is a unit of general comprehensive plan for 
flood control and other purposes in Missouri River 
basin. Project was authorized by 1954 Flood Control 
Act (H. Doc. 549, 81st Cong., 2d sess.), as modified by 
1962 Flood Control Act (H. Doc. 578, 87th Cong., 2d 
sess.). Estimated cost (1970) is $276 million. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations and results during fiscal year. Regular funds, 
new work: Second stage embankment and excavation 
contract was continued to completion at a cost of $125, 
089. Contract for procurement of turbines was continued 
at a cost of $143,584. Design work was 
accomplished by contract at a cost of $9,435. Relocation 
of utilities from construction area required for 
highway relocations was accomplished by contract at a 
cost of $6,035. Award of two contracts for relocation of 
portions of two State roads was made late in the fiscal 
year. A contract for relocation of the Missouri-Kansas- 
Texas Railroad Company's facilities was entered into. 
Hired labor operations consisted of installation of 
observation devices, real estate management, provision 
of temporary construction facilities, preparation of asbuilt 
drawings, engineering and design and supervision 
and administration of construction at a cost of $2,056, 
516. Land acquisition consisted of 8,566 acres in fee, 1, 
010 acres flowage easements, and rights-of-way for 
road relocations at a cost of $2,905,072. 
Condition at end of fiscal year. Entire project is about 14 
percent complete. Construction of relocation of Missouri 
Highway M-13 was initiated September 1964 
and is complete. Removal of unsuitable material from 
east abutment of damsite, construction of right and left 
abutment access roads, temporary office and overlook, 
permanent operations building and operator's quarters, 
first and second stage excavation and embankment, 
and relocation of 16 cemeteries are complete. 
Acquisition of 91,498 acres of land in fee simple 
and flowage easements acquired for 2,943 acres. 
Materials to be used in relocating Minuteman Communication 
Cable have been procured. Contract for 
procurement of turbines is 3 percent complete. Two 
contracts for relocation of portions of two State roads 
and a contract for relocation of Missouri-Kansas-Texas 
Railroad Company's facilities are underway. Planning 
is underway on design memorandums and contract 
plans for other construction features. 
16. HAYS, BIG CREEK, KANS. 
Location. At Hays, Ellis County, Kansas, on left bank 
of Big Creek about 30 miles upstream from its 
confluence with Smoky Hill River. 
612

KANSAS CITY, MO., DISTRICT 
Existing project. Plans provide for channel improvement, 
cutoffs and levees. Project was authorized 
by 1965 Flood Control Act (H. Doc. 160, 89th Cong., 
1st sess.). Estimated Federal cost of construction (1970) 
is $5,600,000 and estimated non-Federal cost of lands, 
damages, and relocations is $2,420,000. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. City Board of Commissioners, by 
resolution dated November 14, 1963 agreed to furnish 
necessary local cooperation. Rights-of-way for the 
detention reservoir to be impounded by 1-70 have been 
acquired. 
Operation and results during fiscal year. Regular funds, 
new work: The general design memorandum was 
completed. 
Condition at end of fiscal year. General design memorandum 
is complete. 
17. HILLSDALE LAKE, BIG BULL CREEK, 
KANS. 
Location. Damsite is about 12 miles above mouth of 
Big Bull Creek, a tributary of Marais des Cygnes River, 
and about 5 miles north of Paola, Miami County, 
Kansas. 
Existing project. Preliminary plans provide for an 
earthfill embankment about 9,250 feet long and about 
90 feet high above the streambed and a gravity type 
uncontrolled spillway section. The total reservoir 
storage capacity would be 160,000 acre-feet (81,000 for 
flood control, 11,000 for sediment reserve, and 68,000 
for multipurpose storage for water supply, downstream 
power, water quality control, and recreation). Local 
interests will be required to make reimbursement for 
water supply storage in the estimated amount of $11, 
140,000. Project was authorized by 1954 Flood Control 
Act (H. Doc. 549, 81st Cong., 2d sess.). Estimated 
Federal cost of construction (1970) is $34,100,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. Local interests must make reimbursement for 
water supply storage in accordance with Water Supply 
Act of 1958 and share in separable cost allocated to 
recreation in accordance with Federal Water Project 
Recreation Act of 1965. 
Operations and results during fiscal year. Regular funds, 
new work: Surveying and mapping and the general 
design memorandum were completed. The preliminary 
master plan and design memorandums for 
real estate, construction materials, embankment, 
relocations, access road, administrative facilities, and 
spillway and outlet works were initiated. 
Condition at end offiscalyear. Preconstruction planning 
is in progress. 
18. KANOPOLIS LAKE, SMOKY HILL 
RIVER, KANS. 
Location. Dam is on Smoky Hill River about 19 miles 
west and 16 miles south of Salina, Kansas, and about 
205 river miles above mouth of stream. 
Existing project. An earthfill dam about 131 feet above 
streambed and a total length of 15,360 feet, including 
4,070 feet of dike section on left abutment and 2,550 
feet of dike section on right abutment impounds 
floodwater within reservoir which provides storage 
capacity of 450,000 acre-feet, (400,000 acre-feet is for 
flood control and 50,000 acre-feet for recreation and 
streamflow regulation). Outlet works and spillway are 
in right abutment. Project is a unit of general 
comprehensive plan for flood control and other 
purposes in Missouri River basin authorized by 1938 
Flood Control Act (Flood Control Committee Doc. 1, 
75th Cong., 1st sess.) as modified by 1941 Flood 
Control Act, and expanded by 1944 Flood Control Act 
(H. Doc. 475, and S. Docs. 191 and 247, 78th Cong., 2d 
sess.). Estimated cost (1970) is $12,661,620, including 
$326,000 Code 710 funds (recreational facilities at 
completed projects). 
Local cooperation. Section 2, Flood Control Act 1938, 
applies. 
Operations and results during fiscal year. Regular funds, 
new work: Review of shop drawings by hired labor, cost 
$113. Regular funds maintenance: Maintenance 
activities by hired labor were slope repair, $2,277; 
cleanup of tornado debris, $5,000; and installation of 
garage doors, $781. A contract for a transmitter for 
remote indicator cost $1,280. A tractor with dozer was 
procured at a cost of $27,255 and purchases of two 
trucks, a patrol boat, and miscellaneous office, grounds, 
reservoir, garage and shop equipment, cost $13,791. 
Routine operation, ordinary maintenance, real estate 
management services, engineering and design, and 
supervision and administration, cost $171,942. Income 
from collections for subsistence, quarters, services, etc., 
totaled $1,809. Proceeds from rentals of reservoir lands 
and recreational fees of $63,326 were deposited in the 
U.S. Treasury. Local governmental units will be paid 
75 percent of the $62,403 received from lease rentals. 
Condition at end of fiscal year. Construction of project 
was initiated June 1940 and dam and spillway were 
completed and ready for use in May 1948. Construction 
of supplemental recreation facilities is underway. 
19. KANSAS CITY, KANSAS RIVER, 
KANS. 
Location. Along the Kansas River at Kansas City, 
Kansas. 
Existing project. Provides for raising existing levees and 
floodwall protection in Argentine, Armourdale, and 
Central Industrial units, and includes necessary bridge 
alterations and modification of appurtenant facilities. 
613

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Existing project was authorized by 1962 Flood Control 
Act (S. Doc. 122, 87th Cong., 2d sess.). Estimated 
Federal cost of construction (1970) is $28,800,000 and 
estimated non-Federal cost of lands, damages, and 
relocations is $5,000,000. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Assurances of local cooperation were 
received December 4, 1968. Local interests possess part 
of right-of-way and have indicated remaining requirements 
will be met early in fiscal year 1971. 
Operations and results during fiscal year. Regular funds, 
new work: Plans and specifications for the upstream 
portion of the Argentine unit were complete and work 
was advertised. Design memorandum for the Armourdale 
unit was initiated and advanced to 15 percent 
of completion. 
Condition at end of fiscal year. Work for construction of 
upstream portion of Argentine unit was advertised. 
Preparation of design memorandum for Armourdale 
unit was 15 percent complete. 
20. KANSAS CITYS ON MISSOURI AND 
KANSAS RIVER, MO. AND KANS. 
Location. Municipal and industrial areas which 
require flood protection extend from mouth of Kansas 
River about 6.5 miles up and 9.5 miles down Missouri 
River and 9.5 miles up Kansas River. 
Existing project. Plan of improvement provided 
protection works consisting principally of levees and 
floodwalls, for 13 separate project units, which are: 
Argentine; Armourdale; Central Industrial; Fairfax- 
Jersey Creek; North Kansas City; East Bottoms; 
channel improvement, Kansas River; bridge and 
approach alterations, Kansas River; channel improvement, 
Missouri River; floodway improvement, 
Missouri River; Birmingham; Blue Valley Industrial; 
and Liberty Bend Cutoff. See Annual Report for 1964 
for detailed description. Estimated cost (1970) is $47, 
620,000, of which $42,500,000 is Federal cost, $619,800 
for work done with funds contributed by local interests, 
and $4,500,200 for lands, damages, and relocation to 
be borne by local interests. (See table 20-C for 
authorizing legislation.) 
Local cooperation. Fully complied with for completed 
work. See Annual Report for 1964 for details. 
Operations and results during fiscal year. Regular funds, 
new work: East Bottoms unit: Repair of Lydia Avenue 
sewer was accomplished by contract at a cost for the 
fiscal year of $18,897. Engineering and design and 
supervision and administration costs in connection 
with this work amounted to $6,765. 
Condition at end of fiscal year. All work proposed under 
this project has been completed except for Turkey 
Creek facilities required for Central Industrial Unit. It 
is anticipated that local interests will seek authorization 
of a review study to consider improvements 
for flood control along Turkey Creek as a separate 
authorization. See Annual Report for 1964 for detailed 
description. 
21. LAWRENCE, KANSAS RIVER, KANS. 
Location. On Kansas River about 50 miles above its 
mouth at Lawrence, Douglas County, Kansas. 
Existing project. Levees along both banks of Kansas 
River and right bank of Mud Creek, channel improvement 
for Mud Creek and Brook Street channel, 
bank protection, and appurtenant facilities for protection 
of North Lawrence and South Lawrence, 
Kansas. Project was authorized by 1954 Flood Control 
Act (H. Doc. 642, 81st Cong., 2d sess.). Estimated 
Federal cost of construction (1970) is $7,200,000 and 
estimated non-Federal cost of lands, damages, and 
relocations is $1,200,000. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Board of Commissioners of city of 
Lawrence furnished required assurances June 8, 1965. 
All required rights-of-way for construction along the 
left bank of the Kansas River in North Lawrence have 
been furnished. 
Operations and results during fiscal year. Regular funds, 
new work: Construction of levees along left bank of 
Kansas River north and west of Massachusetts Avenue 
was continued and 17 percent of the construction 
completed advancing the work to 91 percent of 
completion. Plans and specifications for left bank levee 
east of Massachusetts Avenue downstream into Mud 
Creek were completed, contract awarded July 9, 1969, 
and construction was initiated and advanced to 58 
percent complete. A design memorandum and plans 
and specifications for Mud Creek levee and channel 
work were completed and was advertised for construction 
bids on May 25,1970. Plans and specifications 
for the South Lawrence levee were completed. 
Condition at end of fiscal year. Construction of the 
project was initiated July 31, 1967. Left bank levee 
upstream from Massachusetts Avenue was 91 percent 
complete and downstream levee along left bank was 58 
percent complete. 
22. LITTLE BLUE RIVER CHANNEL 
IMPROVEMENT, LITTLE BLUE 
RIVER, MO. 
Location. The project is located on the Little Blue 
River from the head of Missouri River Levee Unit R 
351 upstream to the vicinity of Wildwood Creek. 
Existing project. The proposed improvements will 
consist of straightening and enlarging the Little Blue 
River channel from the head of Missouri River Levee 
Unit R 351, near Blue Mills Road, upstream to the 
vicinity of Wildwood Creek, reducing the length of this 
section from 20.4 to about 15 miles. Bottom widths, 
sections, and appurtenant structures will be designed to 
fit local conditions. Alteration of two railroad and four 
highway bridges will be required. Improvements in the 
614

KANSAS CITY, MO., DISTRICT 
vicinity of Lake City will consist of diversion of West 
Fire Prairie Creek westward into the Little Blue River 
and construction of a levee along the north side of the 
diversion ditch and along the north bank of the Little 
Blue River below the new confluence of the diversion 
ditch. Project was authorized by Flood Control Act 
approved August 13, 1968, (H. Doc. 169, 90th Cong. 
1st sess.). Estimated Federal Cost of construction 
(1970) is $6,150,000 and estimated non-Federal cost is 
$1,120,000. 
Local Cooperation. Section 3, Flood Control Act of June 
22, 1936, applies to the Little Blue River channel 
improvement works. Jackson County, Missouri, will 
sponsor the project. Assurances have not been requested; 
however, citizens have voted a bond issue to 
finance local costs. 
Operations and results during fiscal year. Regular funds, 
new work. Surveying and mapping was initiated. 
Condition at end offiscalyear. Preconstruction planning 
is underway. 
23. LITTLE BLUE RIVER LAKES, MO. 
Location. This project consists of two lakes in Jackson 
County, Missouri, located in Kansas City, Missouri, 
and suburban communities. The Blue Springs Lake 
site is on the East Fork of the Little Blue River about 
one-half mile south of U.S. Highway 40 and the 
Longview Lake site is on the main stem at approximately 
109th Street. 
Existing project. The Blue Springs dam will be an 
earthfill embankment about 2,600 feet long and rising 
about 75 feet above valley floor, with an uncontrolled 
service spillway and uncontrolled outlet conduit. The 
total reservoir storage capacity will be 23,600 acre-feet 
(16,400 for flood control and 7,200 for multipurpose 
storage for water quality and recreation). 
The Longview dam will be an earthfill embankment 
about 1,800 feet long and rising about 100 feet above 
valley floor, with an uncontrolled service spillway and 
an uncontrolled outlet conduit. The total reservoir 
storage capacity will be 50,000 acre-feet (24,100 for 
flood control and 25,900 for multipurpose storage for 
water quality and recreation). Project was authorized 
by Flood Control Act approved August 13, 1968 (H. 
Doc. 169, 90th Cong., 1st sess.). Estimated Federal cost 
of construction (1970) is $46,900,000. 
Local cooperation. Section 2 of the Flood Control Act of 
June 28, 1938, applies. Local interests must share in 
separable cost allocated to recreation in accordance 
with Federal Water Project Recreation Act of 1965. 
Operations and results during fiscal year. Regular funds, 
new work: Land acquisition consisted of 62 acres in fee 
at a cost of $154,200. The hydrology design memorandum 
was initiated and completed. The general 
design memorandum and surveying and mapping were 
initiated. 
Condition at end of fiscal year. Preconstruction planning 
and land acquisition are underway. 
24. LONG BRANCH LAKE, LITTLE 
CHARITON RIVER, MO. 
Location. Damsite is on East Fork of Little Chariton 
River in north-central Missouri about 4 miles west and 
north of Macon in Macon County. 
Existing project. Preliminary plans provide for an 
earthfill dam about 3,550 feet long and about 66 feet 
high with an uncontrolled outlet conduit and an 
uncontrolled service spillway in right abutment. Total 
reservoir storage capacity would be 65,000 acre-feet 
(29,000 for flood control, 4,000 for sediment reserve, 
and 32,000 of multipurpose storage for water supply, 
water quality control, fish and wildlife, and recreation) 
Local interests will be required to make reimbursement 
estimated at $2,674,000 for water supply 
storage and $860,000 for recreation cost sharing. 
Project was authorized by 1965 Flood Control Act (H. 
Doc. 238, 89th Cong., 1st sess.). Estimated cost (1970) is 
$10,100,000. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies. Local interests must make reimbursement 
for water supply storage in accordance with 
Water Supply Act of 1958 and share in cost of 
recreation facilities in accordance with Federal Water 
Project Recreation Act of 1965. 
Operations and results during fiscal year. Regular funds, 
new work: The general design memorandum was 
completed. 
Condition at end of fiscal year. The hydrology and 
general project development design memorandums 
were completed and surveying and mapping was 90 
percent complete. 
25. MELVERN LAKE, OSAGE (MARAIS 
DES CYGNES) RIVER, KANS. 
Location. Damsite is on Marais des Cygnes (Osage) 
River in Osage County, Kansas, about 2 miles west of 
Melvern, Kansas. 
Existing project. An earthfill dam about 9,700 feet long 
and about 98 feet high with an uncontrolled chute-type 
spillway in left abutment. Total reservoir storage 
capacity would be 363,000 acre-feet (200,000 for flood 
control, 26,000 for sediment reserve, and 137,000 of 
multipurpose storage for water quality control and 
recreation). Project is a unit of general comprehensive 
plan for flood control and other purposes in Missouri 
River basin, authorized by 1954 Flood Control Act (H. 
Doc. 549, 81st Cong., 2d sess.). Estimated cost (1970) is 
$33,900,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations and results during fiscal year. Fee simple title 
to 6,528 acres of land and 448 acres of flowage 
easements was acquired at a cost of $2,604,221. The 
615

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
contract for the construction of embankment, spillway, 
outlet works, and service roads was advanced to 58 
percent of completion at a cost of $2,082,185. Rightsof-
way acquisition for roads and railroads was initiated 
at a cost of $25,629. Road and railroad relocation 
subcontracts were awarded and initiated at a cost of 
$106,692. Hired labor operations, including installation 
of observation devices, cost $76,947. Preparation 
of design memorandum for power and telephone 
line relocation was completed; plans and 
specifications for reservoir clearing were initiated; and 
plans and specifications for relocation of Osage County 
roads were continued; all at a cost of $340,047. 
Supervision and administration cost $419,000. 
Conditions at end of fiscal year. Construction of the 
project was initiated July 13, 1967. Acquisition of 17, 
558 acres of land in fee simple and flowage easements 
for 635 acres has been accomplished. Railroad relocation 
contract has been initiated. State highway 
contract was initiated and advanced to 13 percent 
complete. Initial access roads, administrative facilities 
and operator's quarters are complete. Construction of 
embankment, spillway, outlet works, and service roads 
was 58 percent complete. 
26. MERRIAM, TURKEY CREEK, KANS. 
Location. On Turkey Creek about 7 miles above its 
mouth at Merriam, Johnson County, Kansas. 
Existing project. Proposed plan consists of improving 
about 2.1 miles of main stem and .6 mile of West Fork 
of Turkey Creek and construction of about 3.1 miles of 
levee and a short section of floodwall along both banks. 
Existing project was authorized by 1954 Flood Control 
Act (H. Doc. 642, 81st Cong., 2d sess.) as a unit of 
comprehensive plan for Missouri River basin. Estimated 
Federal cost of construction (1969) is $1,430, 
000 and estimated non-Federal cost of lands, damages, 
and relocations is $1,150,000. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Merriam Drainage District Board 
furnished a resolution of intent to provide required 
assurances on September 14, 1964. An alternate plan 
was presented to the sponsor in May 1965 and the 
Drainage District had appraisals made of the non- 
Federal cost of this plan. Local interests are now 
considering a joint flood control-urban renewal plan to 
enable them to finance rights-of-way costs. Formal 
request for assurances of local cooperation was made by 
letter dated November 27, 1968. Authorization for the 
project will expire on November 27, 1973. Local 
interests have indicated that funds to sponsor the 
project are not available and prospects for funding are 
poor at this time. 
Operations and results during fiscal year. Regular funds, 
new work: No work accomplished during the fiscal 
year. 
Condition at end of fiscal year. Preconstruction planning 
suspended pending receipt of necessary local cooperation. 
27. MILFORD LAKE, REPUBLICAN 
RIVER, KANS. 
Location. Damsite is on Republican River near village 
of Alida and about 8 miles downstream from Milford, 
Geary County, Kansas, and about 10 miles above 
confluence of Republican and Smoky Hill Rivers 
which form Kansas River near Junction City, Kansas. 
Existing project. An earthfill dam about 6,300 feet long 
and 125 feet high with an uncontrolled service-chute 
spillway in a saddle on right abutment. Total reservoir 
storage capacity will be 1,160,000 acre-feet (700,000 for 
flood control, 160,000 for sediment reserve and 300,000 
of multipurpose storage for water supply, water quality 
control, and recreation). Water supply storage is 
included in project at request of Governor of Kansas 
under provisions of Federal Water Supply Act of 1958. 
Local interests will be required to make reimbursement 
for water supply storage in the estimated amount of 
$13,467,000. Project is a unit of general comprehensive 
plan for flood control and other purposes in Missouri 
River basin authorized by 1954 Flood Control Act (H. 
Doc. 642, 81st Cong., 2d sess.). Estimated cost (1970) is 
$49,492,200 including $1,834,000, Code 710 funds 
(recreational facilities at completed projects). 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. Local interests must make reimbursement for 
water supply storage in accordance with Water Supply 
Act of 1958. 
Operations and results during fiscal year. Regular funds, 
new work: Resettlement payments amounted to $9, 
382. Railroad relocation was completed by contract at 
a cost of $87,526. Completion of administrative 
facilities by contract was accomplished at a cost of $3, 
403. Stabilization of outlet channel of dam was 
completed at a cost of $3,532. Contract for completion 
of recreation facilities was awarded and work started at 
a cost of $19,675. Forestation work in public use areas 
in cooperation with the Forest Service, Department of 
Agriculture, cost $2,877. Engineering and design, 
supervision and administration, and real estate management, 
were accomplished by hired labor at a cost of 
$36,835. Receipts from outleasing of reservoir land of 
$43,288 were deposited in the U.S. Treasury. Local 
governmental units will be paid 75 percent of this 
income. Maintenance: Maintenance activities performed 
by contract were stockpiling rock for riprap, $7, 
874; resealing of roads, $35,669; tree planting and 
revegetation development and maintenance, $85,372; 
and initiation of contract for stabilization of relief well 
outlet ditches, $8,747. Purchase of a mower and 
miscellaneous office, grounds, reservoir, garage, and 
shop equipment cost $2,147. Routine operation, 
ordinary maintenance, real estate management services, 
and supervision and administration cost $221,629. 
616

KANSAS CITY, MO., DISTRICT 
Income from crop disposals totaled $164. Proceeds from 
recreational fees of $153 were deposited in the U.S. 
Treasury. 
Condition at end of fiscal year. Construction of project 
began July 7, 1961. The entire project is essentially 
complete and is operating for flood control. 
All construction is essentially completed except 
completion of downstream public use development 
construction. 
28. MISSOURI RIVER LEVEE SYSTEM, 
IOWA, NEBR., KANS., AND MO. 
(RULO, NEBR., TO MOUTH) 
Location. On both banks of Missouri River from Sioux 
City, Iowa, about 760 miles to mouth near St. Louis, 
Missouri. Portion of project in Kansas City District 
extends from Rulo, Nebraska, 498 miles to mouth. 
Existing project. A series of levee units and appurtenant 
works along both sides of Missouri River 
from Sioux City, Iowa, to the mouth, for protection of 
agricultural lands and small communities against 
floods. Cost estimate (1970) for active portion of project 
from Rulo, Nebraska, to mouth is $114,420,000, of 
which $104,020,000 is Federal cost for construction and 
$10,400,000 for lands and damages to be borne by local 
interests. Remaining portion of project consists of units 
on which planning and construction were deferred 
pending completion of restudy to assure that additional 
levee construction is economically justified. Cost 
estimate for deferred portion of project Rulo, Nebraska, 
to mouth is $248,594,000, of which $228,608, 
000 is Federal cost for construction and $19,986,000 for 
lands and damages to be borne by local interests. Unit 
prices for deferred units are based on 1964 price levels. 
(See table 20-C for authorizing legislation.) 
Local cooperation. Section 3, Flood Control Act of 1936, 
applies. Fully complied with for all completed units 
and units under construction. Sponsor for Unit L345- 
330 has settled major part of condemnations for rightof-
way acquisition and plans out-of-court settlement 
with land owners for the remaining right-of-way. All 
rights-of-way are expected to be made available in 
fiscal year 1971. 
Operations and results during fiscal year. Regular funds, 
new work: Preparation of operation and maintenance 
manual and as built drawings and supervision and 
administration for the Elwood-Gladden and South St. 
Joseph Levee Districts by hired labor cost $12,895. 
Raising railroad signal lines, channel improvement 
and levee construction for the Kimsey-Holly Creek 
levees cost $593,528. Engineering and design, supervision 
and administration, and general engineering 
studies pertaining to other units cost $373,907. 
Condition at end of fiscal year. Construction of project 
was initiated in June 1948. Report on restudy of 
deferred units of the project is being reviewed by higher 
authority. Status of individual units of active portion of 
project at end of fiscal year is shown in table 20-F on 
Missouri River levee system. 
29. MISSOURI RIVER BASIN (KANSAS 
CITY DIST.) 
Location. Flood control improvements included in this 
project are on and along Missouri River and several 
principal tributaries of Missouri River and in States 
comprising Missouri River basin. 
Existing project. General comprehensive plan for flood 
control and other purposes in Missouri River basin 
provides for levees along Missouri River between Sioux 
City, Iowa, and the mouth, flood-protection works at 
certain municipalities, and reservoirs on main stem of 
Missouri River and on tributaries for control of 
floodflows at damsite. (See table 20-C for authorizing 
legislation.) (See also table 20-G on Kansas City 
District projects included in comprehensive plan.) 
Operations and results during fiscal year. Regular funds, 
new work: Operations, together with costs and expenditures, 
for those projects on which plans were in 
preparation or construction was initiated, are shown in 
individual reports. Under sections 7 and 9, 1944 Flood 
Control Act, the Corps is responsible for detailed 
scheduling of operations of storage capacity reserved 
for or assigned to flood control in reservoirs constructed 
by Bureau of Reclamation as well as those constructed 
by the Corps. Maintenance (scheduling of flood control 
reservoir operation) cost $205,909. 
Condition at end offiscalyear. See individual reports. 
30. ONAGA LAKE, KANSAS RIVER, KANS. 
Location. The project is located on Vermillion Creek 
in Pottawatomie County, Kansas, about 30 miles 
northwest of Topeka, Kansas. 
Existing project. Preliminary plans provide for an 
earthfill dam about 8,800 feet long and about 90 feet 
high above valley floor with an uncontrolled service 
spillway. The total reservoir storage capacity would be 
302,000 acre-feet (202,000 for flood control, 14,000 for 
sediment reserve, and 86,000 multipurpose storage for 
water supply and recreation). Local interests will be 
required to make reimbursement for water supply 
storage in the estimated amount of $6,420,000. Project 
was authorized by 1962 Flood Control Act (S. Doc. 
122, 87th Cong., 2d sess.). Estimated Federal cost of 
construction (1970) is $32,700,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. Reimbursement will be required for water 
supply storage to be provided in accordance with 
Water Supply Act of 1958. 
Operations and results during fiscal year. Regular funds, 
new work: Surveying and mapping advanced to 80 
percent completion. The general design memorandum 
was initiated and advanced to 30 percent completion 
and the site selection design memorandum was 
completed. 
617

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end offiscalyear. Preconstruction planning 
is in progress. 
31. OSAWATOMIE, POTTAWATOMIE 
CREEK, KANS. 
Location. At Osawatomie, Miami County, Kansas, on 
left bank of Pottawatomie Creek and right bank of 
Osage (Marais des Cygnes) River at the confluence of 
the streams. 
Existing project. Plan consists of channels, levees, and 
pumping facilities. This protection was authorized 
under 1954 Flood Control Act (H. Doc. 549, 81st 
Cong., 2d sess.). Estimated Federal cost of construction 
(1970) is $2,038,200 and estimated non-Federal cost of 
lands, damages, and relocations is $370,000. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. All rights-of-way have been furnished. 
Operations and results during fiscal year. Regular funds, 
new work: Construction of levees and channel was 
advanced to 84 percent completion. Work under the 
contract for temporary support of the Missouri Pacific 
Railroad tracks during construction of sandbag sills 
was initiated and 82 percent of the work completed. 
Condition at end of fiscalyear. Construction of the levees 
and channel improvements was initiated June 11, 
1968, and construction was 86 percent complete. 
Railroad track alterations were underway. 
32. PATTONSBURG LAKE, GRAND 
RIVER, MO. 
Location. Damsite is on Grand River, a major 
tributary of Missouri River, in north-central Missouri 
about 5 miles upstream from Gallatin, Missouri, in 
Daviess County. Lake would extend upstream into 
Dekalb, Gentry, and Harrison Counties. 
Existing project. Preliminary plan provides for an 
earthfill dam about 6,500 feet long and about 103 feet 
high with an uncontrolled service spillway in right 
abutment. Total reservoir storage capacity would be 2, 
720,000 acre-feet (1,430,000 for flood control, 334,000 
for sediment reserve, and 956,000 of multipurpose 
storage for recreation and supplemental water supply 
for water quality control and other related purposes). 
Project was authorized by 1965 Flood Control Act (H. 
Doc. 241, 89th Cong., 1st sess.). Estimated cost (1970) is 
$143,700,000 including $18,700,000 for raising Missouri 
Highway 1-35 crossing above the proposed lake. 
The Public Works Appropriation Act, 1967, included 
funds to initiate advance participation with the 
Missouri State Highway Commission in constructing 
Interstate Highway 35 to an elevation that will provide 
adequate clearance over the Pattonsburg Lake pool, 
thereby eliminating necessity for subsequent raising. 
Local cooperation. The State of Missouri has been 
authorized by the Bureau of Public Roads to acquire 
rights-of-way in the vicinity of the lake and determination 
of rights-of-way requirements is essentially 
complete. The State has been advised to withhold 
acquisition until notification to proceed is issued by 
higher authority. 
Operations and results during fiscal year. A cost reimbursable 
contract was underway with the Missouri 
State Highway Commission for design and construction 
of 1-35 Highway across the proposed Pattonsburg 
Lake at high level above full pool elevation. 
Design studies under this contract cost $17,068. 
Engineering and design and supervision and administration 
by hired labor cost $14,130. 
Condition at end of fiscal year. Under a contract 
negotiated with the State of Missouri, design is 
proceeding on a high level lake crossing consisting of 
two bridges connected by an embankment fill section. 
33. PERRY LAKE, DELAWARE RIVER, 
KANS. 
Location. Damsite is on Delaware River about 5 miles 
above mouth in Jefferson County, Kansas, and about 3 
miles north of Perry, Kansas. 
Existing project. An earthfill dam about 7,750 feet long 
constructed to an elevation about 95 feet above valley 
floor with gated-outlet works and an uncontrolled 
spillway in left abutment. Total lake storage capacity is 
770,000 acre-feet (480,000 for flood control, 140,000 for 
sediment reserve and 150,000 of multipurpose storage 
for water supply,waterquality control, and recreation). 
Water supply storage is included in project plan at 
request of State of Kansas under provisions of Federal 
Water Supply Act of 1958. Local interests will be 
required to make reimbursement for water supply 
storage in the estimated amount of $8,290,000. Project 
is a unit of general comprehensive plan for flood 
control and other purposes in Missouri River basin, 
authorized by 1954 Flood Control Act (H. Doc. 642, 
81st Cong., 2d sess.). Estimated cost (1970) is $48,226, 
000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations and results during fiscal year. Regular funds, 
new work: Acquired easements on 2 tracts for 0.84 acre 
of land and paid deficiency judgments at a cost of $137, 
188. Rights-of-way acquisitions for road, railroad and 
utilities relocations cost $10,104. Relocation of State 
highways, County roads, the Santa Fe Railroad line, 
telephone lines, powerlines, pipelines, and municipal 
facilities at Valley Falls, Kansas, continued by contract 
at a cost of $1,198,328. Reservoir clearing by contract 
cost $24,490. Marking of lake boundaries by contract 
continued at a cost of $110,752. Boundary marking by 
the U.S. Bureau of Land Management was accomplished 
on a reimbursable basis at a cost of $102, 
558. Construction of outlet works and access roads was 
completed at a cost of $107,046. Construction of boat 
ramps and access roads was accomplished at a cost of 
$593,332. Contract for construction of recreation 
618

KANSAS CITY, MO., DISTRICT 
facilities and structures was awarded and advanced to 
67 percent complete at a cost of $996,532. Recreation 
equipment and forestation cost $131,690. Maintenance 
of completed facilities, procurement of permanent 
operating equipment, installation of observation devices, 
real estate management, engineering and design, 
and supervision and administration of construction 
were accomplished by hired labor at a cost of $626,391. 
Proceeds of $79,860 from outleasing of reservoir lands, 
of which 75 percent will be paid to local governmental 
units, were deposited in the U.S. Treasury. Maintenance: 
Routine operation, ordinary maintenance, 
supervision and administration cost $60,543. Income 
from collections for subsistence, quarters, and services, 
totaled $1,273. 
Condition at end of fiscal year. Construction began in 
March 1964 and project is about 94 percent complete. 
Construction of access and detour roads, relocation of 
cemeteries, and construction of administrative facilities 
and operators' quarters, embankment, and spillway 
and outlet works are complete. Recreation facilities are 
67 percent complete. Acquired 39,249 acres of real 
estate in fee and flowage easement on 3,222 acres. 
34. PLATTE RIVER, MO., CHANNEL 
IMPROVEMENT 
Location. Along the Platte River from Agency, 
Missouri, to its mouth in Buchanan and Platte 
Counties. 
Existing project. Plan consists of clearing and enlarging 
about 10 miles of the Platte River in the vicinity of 
Agency, Missouri, and enlarging and straightening by 
construction of cut-offs the remaining 56 miles downstream 
from Agency to the mouth. Protection was 
authorized by 1965 Flood Control Act (H. Doc. 262, 
89th Cong.," 1st sess.). Estimated Federal cost of 
construction (1970) is $7,630,000 and estimated non- 
Federal cost of lands, damages, and relocations is $830, 
000. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Assurances have not been requested. 
Operation and results during fiscal year. Surveying and 
mapping was completed and the general design 
memorandum advanced to 70 percent completion. 
Condition at end offiscalyear. Preconstruction planning 
is in progress. 
35. POMME DE TERRE LAKE, POMME 
DE TERRE RIVER, MO. 
Location. Dam is on main stem of Pomme de Terre 
River, about 44 miles above mouth of stream in 
Hickory County, Missouri, lake extending upstream 
into Polk County, Missouri. Site is about 3 miles south 
of Hermitage, Missouri, and 20 miles north of Bolivar, 
Missouri. 
Existing project. An earth and rockfill dam about 4,630 
feet long constructed to about 155 feet above riverbed 
with minimum provisions for future installation of 
power-generating facilities, and a dike section on left 
abutment about 2,790 feet long, impounds floodwater 
within reservoir which provides storage capacity of 650, 
000 acre-feet (407,000 for flood control and 243,000 for 
sedimentation and multipurpose). Project is a unit of 
general comprehensive plan for flood control and other 
purposes in Missouri River basin, authorized by 1938 
Flood Control Act (Flood Control Committee Doc. 1, 
75th Cong., 1st sess.), as modified by Flood Control 
Acts of December 22, 1944, and September 3, 1954 (H. 
Doc. 475, and S. Docs. 191 and 247, 78th Cong., 2d 
sess. and H. Doc. 549, 81st Cong., 2d sess.). Estimated 
cost (1970) is $17,096,092, including $329,140 Area 
Redevelopment Act funds and $1,812,000 Code 710 
funds (recreational facilities at completed projects). 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations and results during fiscal year. Regular funds, 
new work: Supplemental recreation facilities consisting 
of forestation plantings and floating service station 
were constructed at a cost of $23,285. Hermitage road 
surfacing plans and specifications were initiated at a 
cost of $4,214. Maintenance: Maintenance activities 
performed by hired labor were initiation of stoplog 
modification, $5,516; installation of a display panel, 
$211; and construction of a utility building, $874. A 
tractor with dozer was procured at a cost of $27,100. 
Purchase of a truck, two mowers, two tractors, and 
miscellaneous office, ground, reservoir, garage, and 
shop equipment, cost $14,135. Routine operation, 
ordinary maintenance, real estate management services, 
and supervision and administration, cost $216, 
190. Income from collections for subsistence, quarters 
and services, totaled $1,680. Proceeds from rentals of 
reservoir lands and recreational fees of $8,244 were 
deposited in the U.S. Treasury. Local governmental 
units will be paid 75 percent of the $7,546 received 
from lease rentals. 
Condition at end of fiscal year. Construction of project 
was initiated January 1957 and placed in operation in 
October 1961. Project is complete. Construction of 
supplemental recreation facilities is underway. 
36. POMONA LAKE, ONE HUNDRED TEN 
MILE CREEK, KANS. 
Location. Dam is on One Hundred Ten Mile Creek, a 
tributary of Marais des Cygnes (Osage) River, 7 miles 
above mouth of stream in Osage County, Kansas, 
about 7 miles northwest of Pomona, Kansas, and 34 
miles upstream from Ottawa, Kansas. 
Existing project. An earthfill dam 7,750 feet long 
constructed to an average height of about 85 feet above 
streambed, with gated-outlet works and an ungated 
chute-type spillway near left abutment. Total reservoir 
storage capacity is 230,000 acre-feet (160,000 for flood 
control, 14,000 for sediment reserve, and 56,000 of 
multipurpose storage for water quality control and 
619

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
recreation). This project is a unit of general comprehensive 
plan for flood control and other purposes in 
Missouri River basin, authorized by 1954 Flood 
Contiol Act (H. Doc. 549, 81st Cong., 2d sess.). 
Estimated cost (1970) is $14,152,908 including $880, 
800 for provision of supplemental recreation facilities. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations and results during fiscal year. Regular funds, 
new work: Supplemental recreation facilities consisting 
of pit toilets and forestation plantings were constructed 
by hired labor at a cost of $4,005. Maintenance: 
Maintenance work by contract consisted of forestry 
development and maintenance, $47,164; stockpiling 
rock for riprap, $9,200; and purchase and installation 
of a hi-lift pump, $686. Hired labor cost for modification 
of stoplogs was $9,602. Fencing of cableway by 
hired labor, cost $1,088. Repair of slope protection at a 
cost of $10,011 was performed by contract and hired 
labor. A tractor with dozer was procured at a cost of 
$27,175. Purchase of two tractors, a carryall, and 
miscellaneous office, grounds, reservoir, garage, and 
shop equipment, cost $10,841. Routine operation, 
ordinary maintenance, real estate management services, 
engineering and design, and supervision and 
administration, cost $208,178. Income from collections 
for subsistence, quarters, and services totaled $2,100. 
Proceeds from sale of water, rentals of reservoir lands, 
and recreational fees of $10,097 were deposited in the 
U.S. Treasury. Local governmental units will be paid 
75 percent of the $9,237 received from lease rentals. 
Condition at end of fiscal year. Construction began July 
1958 and project was placed in operation October 
1963. Project is complete. Construction of supplemental 
recreation facilities is underway. 
37. RATHBUN LAKE, CHARITON RIVER, 
IOWA 
Location. Damsite is on Chariton River about 7 miles 
north of Centerville and 1 mile north of town of 
Rathbun, Appanoose County, Iowa. 
Existing project. An earthfill dam 10,600 feet long 
constructed to an elevation about 86 feet above valley 
floor, with gated-outlet works and an uncontrolled 
service chute with paved sill spillway about a mile 
upstream from left abutment. Total reservoir storage 
capacity is 552,000 acre-feet (339,000 for flood control, 
24,000 for sediment reserve and 189,000 of multipurpose 
storage for navigation, water quality control, 
and recreation). Project authorized by 1954 Flood 
Control Act (H. Doc. 561, 81st Cong., 2d sess.). 
Estimated cost (1970) is $26,500,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations and results during fiscal year. Stage III 
reservoir clearing contract was completed. Plans and 
specifications were completed for stage III recreation 
facilities. The master plan was completed. Land 
acquisition by hired labor included acquisition in fee 
simple of 779 acres and flowage and access road 
easements on 481 acres cost $55,130. Relocation 
contracts were completed with owners of three telephone 
companies for alteration and removal of 
telephone facilities. The contract with Chariton Valley 
Electric Cooperative was advanced to 95 percent 
completion. A major contract for construction of the 
dam was completed. A construction contract for 
relocation of remaining county roads in Appanoose, 
Wayne, and Lucas Counties was advanced to 93 
percent completion. A construction contract for stage 
V access roads, including stage I interior roads and 
boat ramps was advanced to 51 percent completion. 
Stage VI access roads, including stage II interior roads 
and parking were readvertised early in the fiscal year. 
A construction contract awarded and advanced to 21 
percent completion. Construction by contract cost $2, 
478,623. Other hired labor operations consisted of 
installation of observation devices at the dam, operation 
and maintenance during construction, surveys 
and layouts, engineering and design, and supervision 
and administration at a cost of $569,240. Maintenance: 
Routine operation, ordinary maintenance, 
supervision and administration, cost $26,602. 
Condition at end of fiscal year. Construction of project 
began September 26, 1964. Land acquired consists of 
33,908 acres in fee simple and 2,164 acres in flowage 
and access road easements. The entire project is 85 
percent complete. Stage I access road to the dam and 
stage II roads (remainder of service road A in the 
administrative area and south access road to the dam) 
are complete. The administrative facilities, including 
operators' quarters are complete. Construction of a 
segment of Appanoose County Highway M and Lucas 
County relocation of 9A is complete. All utility 
relocations are underway or complete. Reservoir 
clearing is complete. Construction of the dam is 
complete. Relocation of remaining County roads in 
Appanoose, Wayne, and Lucas Counties is 93 percent 
complete. Construction of stage V access roads, 
including stage I interior roads and boat ramps, is 51 
percent complete. Construction of stage VI access 
roads and stage II interior roads is 21 percent complete. 
38. SMITHVILLE CHANNEL, LITTLE 
PLATTE RIVER, MO. 
Location. The project is located on the Little Platte 
River at Smithville, Missouri. 
Existing project. Preliminary plans provide for about 
2.4 miles of channel improvement consisting of clearing 
overbank areas to provide additional floodway at 
Smithville, Missouri. Estimated Federal cost of construction 
(1970) is $81,300 and estimated non-Federal 
cost is $14,000. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Formation of a drainage district was 
approved by the County Court in February 1968. Plan 
620

KANSAS CITY, MO., DISTRICT 
of reclamation was filed with the circuit court March 4, 
1969, and the court has appointed Commissioners. 
Formal assurances were requested on July 28, 1970. 
Operations and results during fiscal year. Regular funds, 
new work: No work was performed during the fiscal 
year due to inability of local interests to provide 
construction rights-of-way. 
Condition at end of fiscal year. General design memorandum 
was completed. Plans and specifications for 
clearing floodway are in progress. 
39. SMITHVILLE LAKE, LITTLE PLATTE 
RIVER, MO. 
Location. Damsite is on Little Platte River about 1 
mile northeast of Smithville and about 5 miles north of 
Kansas City, in Clay and Clinton Counties, Missouri. 
Existing project. Plans provide for an earthfill dam 
about 4,200 feet long and 95 feet high with an 
uncontrolled service spillway. A dike about 2,000 feet 
long would be constructed across a saddle in left 
abutment. Total reservoir storage capacity would be 
299,000 acre-feet (105,000 for flood control, 89,000 for 
sediment reserve, and 105,000 of multipurpose storage 
for water supply, water quality control, and recreation) . 
Local interests will be required to make reimbursement 
for water supply storage in the estimated 
amount of $9,473,000. Estimated Federal cost of 
construction (1970) is $39,000,000. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies. Reimbursement will be required for 
water supply storage to be provided in accordance with 
Water Supply Act of 1958 and for recreation provided 
in accordance with Federal Water Project Recreation 
Act of 1965. 
Operations and results during fiscal year. Regular funds, 
new work: Preliminary master plan advanced to 90 
percent complete, spillway and outlet works and 
embankment design memorandums advanced to 30 
percent complete, and access roads design memorandum 
advanced to 5 percent complete. Geology, 
construction materials, cost allocation, and administrative 
facilities design memorandums were 
completed. Plans and specifications for administrative 
facilities advanced to 95 percent complete. 
Condition at end of fiscal year. Surveying and mapping, 
hydrology, site selection, general project development, 
geology, construction materials, cost allocation, and 
administrative facilities design memorandums are 
complete. Preliminary master plan, real estate, spillway 
and outlet works, embankment, and access roads 
design memorandums are in progress. Plans and 
specifications for administrative facilities are in progress. 
40. STOCKTON LAKE, SAC RIVER, MO. 
Location. Damsite is on Sac River about 49.5 miles 
above its confluence with Osage River, and about 2 
451-584 0-72-40 
miles east of Stockton, Cedar County, Missouri, lake 
extending into Dade and Polk Counties. 
Existing project. Plan provides for a rock-shell dam 
with impervious core about 5,100 feet long to be 
constructed to an average height of about 128 feet, with 
a gated overfall spillway and a 45,200-kilowatt power 
installation. Total reservoir storage capacity would be 
1,674,000 acre-feet (774,000 for flood control, 25,000 
for sediment reserve and 875,000 multipurpose storage 
for power and recreation). Project is a unit of general 
comprehensive plan for flood control and other 
purposes in Missouri River basin, authorized by 1954 
Flood Control Act (H. Doc. 519, 81st Cong., 2d sess.). 
Estimated cost (1970) is $73,000,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations and results during fiscal year. Regular funds, 
new work: Construction by contract of spillway, 
powerplant intake and substructure, completion of 
embankment and relocation of Missouri State Highway 
32 was continued to physical completion, $616, 
078; continued procurement of turbine to 99 percent of 
completion, $48,288; continued relocation of power 
lines, $218,326; continued construction of road relocations, 
$1,626,477; continued relocation of telephone 
lines, $4,670; completion of reservoir clearing, 
$182,378; continued procurement of generator, $948, 
368; continued procurement of other powerplant 
equipment, $422,137; and continued construction of 
access roads and boat ramps, $606,031. Construction of 
powerhouse superstructure and switchyard was continued 
to 33 percent of completion at a cost of $856, 
708. Contracts for public use area development and 
interior roads were awarded late in the fiscal year. 
Hired labor operations consisted of grouting of abandoned 
wells, installation of observation devices, 
procurement of equipment for operation of project, 
establishment of sedimentation and degradation 
ranges, real estate management, provision of temporary 
construction facilities, engineering and design, 
and supervision and administration of construction at a 
cost of $1,286,622. Land acquisition consisted of 
deficiency judgments at a cost of $193,829. 
Condition at end of fiscal year. Construction of project 
began October 1963 and entire project is about 84 
percent complete. Acquisition of 58,788 acres of land in 
fee simple and flowage easements acquired for 2,621 
acres. Construction of first stage embankment, access 
road, initial service roads, administrative facilities, 
operators' quarters, and tree planting are complete. 
Construction of spillway, powerplant intake and 
substructure, completion of embankment and relocation 
of Missouri State Highway 32, and relocation 
of cemeteries is complete. Contract for procurement of 
gates and bulkheads is complete. Contracts for procurement 
of turbine, generator and other powerplant 
equipment, relocation of roads, power and telephone 
lines, relocation of municipal facilities of Aldrich, 
21

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Missouri, construction of powerhouse superstructure 
and switchyard, construction of access roads and boat 
ramps, construction of interior roads and public use 
area development are underway. 
41. STONEHOUSE CREEK, JEFFERSON 
COUNTY, KANS. 
Location. Near the town of Williamstown, Kansas, 
about 5 miles east of Perry, Kansas. 
Existing project. Improvements previously constructed 
consist of a levee along the left bank of Stonehouse 
Creek west of the town of Williamstown to tie into high 
ground north of Williamstown, channel improvement, 
and lengthening of the Union Pacific Railroad bridge 
to increase the floodway area. Project was constructed 
under authority of Section 205 of the 1948 Flood 
Control Act, as amended. Rapid deterioration of bank 
protection and resulting bank erosion requires remedial 
action consisting of grading channel slopes and 
placing riprap at five locations. Estimated Federal cost 
of construction including remedial work, is $255,052. 
Non-Federal costs of lands, damages, and relocations is 
$102,000. 
Local cooperation. Section 3, Flood Control Act of June 
2, 1936, applies. All rights-of-way have been furnished. 
Operations and results during fiscal year. Regular funds; 
new work: A rehabilitation contract awarded June 30, 
1969, was completed November 12,1969. 
Condition at end of fiscal year. Rehabilitation of 
Stonehouse Creek was completed. 
42. TOPEKA, KANSAS RIVER, KANS. 
Location. On right and left banks of Kansas River at 
Topeka, Kansas. 
Existing project. Project was divided into eight 
separate units as follows: Auburndale unit: Adapting 
1.1 miles of proposed interstate limited-access (4 lane) 
highway to serve as levee protection. Highway is on 
landside, roughly parallel to Chicago, Rock Island & 
Pacific Railroad, and from 2 to 4 feet higher than 
required levee, which averages 13 feet high throughout 
the reach. Ward Creek will be diverted to river 
opposite approximate Kansas River mile 87.3 by local 
interests. Two pumping plants and gating of highway 
drainage structure over diverted Ward Creek channel 
complete primary features of Auburndale unit flood 
protection. 
Bridge and approach alterations unit: Alterations of 
two railroad bridges over Kansas River. 
Channel and floodway improvement unit: Removing 
obstructions from Kansas River channel at 
critical points. (More detailed study of this unit 
indicated that removal of such obstructions could be 
avoided without adverse effect on river flow conditions.) 
North Topeka unit: Levee and appurtenances 
starting at junction of Menoken Road and right bank 
of Soldier Creek diversion levee, thence south and 
southeast, paralleling raised Menoken Road grade and 
Union Pacific Railroad tracks to Kansas State highway 
and embankment, serving as a levee, thence south 
to left bank of Kansas River at approximate mile 88.8. 
From this point levee generally follows left bank of 
river to mouth of new Soldier Creek diversion channel 
at approximate mile 81.9. Construction features of this 
unit consist of 8.6 miles of levees averaging 11.7 feet 
high; 84 feet of floodwalls averaging 11.6 feet high; 
relief wells and collector system; 3,000 feet of road raise 
averaging 1 foot to serve as a levee; 4.5 miles of bank 
protection; drainage structures and alterations to 
sanitary sewer; channel enlargement; one stoplog gap 
and one sandbag gap; and two new pumping plants 
and alterations to one existing plant. 
Oakland unit: About 515 feet of floodwall averaging 
12 feet high; 300 feet of retaining wall averaging 10 feet 
high; 10.1 miles of levees with average height of 10 feet, 
extending from existing South Topeka floodwall 
downstream along right bank of Kansas River to 
mouth of Shunganunga Creek, thence upstream along 
left bank of creek to vicinity of 12th and Jefferson 
Streets; improvement of Shunganunga Creek channel; 
relief wells and collector system; drainage structures 
and alterations to sanitary sewers; one new railroad 
overflow structure and removal of 11 existing highway 
bridges; railroad track raises at three locations; and 
one pumping plant. 
Soldier Creek diversion unit: Realine and straighten 
channel of Soldier Creek along north bluff for about 9.2 
miles to Indian Creek so as to enter Kansas River via 
new mouth for Indian Creek, and construct about 14.6 
miles of levees averaging 8.7 feet high, 2.6 miles of 
tributary tieback levees, 0.7 mile of levee raise, and new 
bridges for Union Pacific; Chicago, Rock Island & 
Pacific; and Atchison, Topeka & Santa Fe Railroads. 
South Topeka unit: Under previous authorization, 
levees and floodwalls were constructed, which provide 
protection to municipal waterworks extending from 
approximate river mile 88 to 88.3. In addition, a short 
floodwall and levee were constructed along right bank 
from approximate river mile 84.8 to 86.2. In addition to 
work done under previous authorization, it is contemplated 
to raise and reinforce existing levee and 
floodwall from approximate river mile 84.8 to 86.2, 
participate in cost-sharing of another plant constructed 
by the city of Topeka, construct a pumping plant and 
modify an existing stoplog gap. 
Waterworks unit: Under previous authorization, 
floodwalls were constructed as a part of South Topeka 
unit extending from approximate river mile 88 to 88.3 
to provide protection of this unit. In addition to work 
done under previous authorization, work included in 
current authorization provides for raising existing levee 
at west end of floodwall, construction of a new tieback 
levee at east end to incorporate a larger waterworks 
area, and installation of pressure-relief wells to dispose 
of seepage water. 
622

KANSAS CITY, MO., DISTRICT 
Protection authorized by 1936 Flood Control Act 
(H. Doc. 195, 73d Cong., 2d sess.), was modified and 
expanded by 1954 Flood Control Act (H. Doc. 642, 
81st Cong., 2d sess.). Estimated Federal cost of 
construction (1970) is $21,100,000 and estimated non- 
Federal cost of lands, damages and relocations is $11, 
600,000 to be borne by local interests. 
Local cooperation. Assurances for Soldier Creek unit 
were furnished by North Topeka Drainage District on 
March 12, 1957, and assurances for Waterworks unit, 
and other remaining units, were furnished by city of 
Topeka on June 14, 1957. All rights-of-way have been 
furnished. 
Operations and results during fiscal year. Regular funds, 
new work: The repair of stage III channel and levee in 
the Soldier C. eek diversion was completed. A contract 
was awarded for construction of South Topeka unit 
and advanced to 21 percent complete. Preparation of 
operation and maintenance manuals for South Topeka 
and Oakland units, by hired labor, cost $22,973. 
Engineering and design by hired labor cost $40,081. 
Construction by contract cost $537,100. Preparation of 
record drawings for Soldier Creek diversion and 
Oakland units, by hired labor, cost $2,985. Supervision 
and administration of above work by hired labor cost 
$56,564. 
Condition at end of fiscal year. Construction of original 
project was initiated April 1938 and construction of 
expanded project was initiated March 1957. Expanded 
project is about 90 percent complete. Construction of 
the remaining unit, South Topeka, is underway. 
Construction of the Auburndale, Bridge and Approach 
Alterations, North Topeka, Oakland, Soldier Creek, 
and Waterworks units is complete. 
43. TUTTLE CREEK LAKE, BIG BLUE 
RIVER, KANS. 
Location. Dam is on main stem of Big Blue River, 
about 12 miles above mouth of stream in Riley and 
Pottawatomie Counties, Kansas. Site is about 12 miles 
northwest of Manhattan, Kansas. 
Existing project. A dam 7,500 feet loig and 157 feet 
high. Project is unit of general comprehensive plan for 
flood control and other purposes in Missouri River 
basin authorized by 1938 Flood Control Act (Flood 
Control Committee Doc. 1, 75th Cong., 1st sess.), as 
modified by 1941 Flood Control Act, and expanded by 
Flood Control Act of December 22, 1944 (H. Doc. 475, 
and S. Docs. 191 and 247, 78th Cong., 2d sess.). Total 
reservoir storage capacity is 2,346,000 acre-feet (1,933, 
000 for flood control, 228,000 for sediment reserve and 
185,000 for multipurpose storage, low flow regulation, 
and recreation). Estimated cost (1970) $80,522,068, 
including $472,000 Code 710 funds (recreational 
facilities at completed projects). 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations and results during fiscal year. Regular funds, 
new work: Preparation of supplemental real estate 
design memorandum and title work continued at a cost 
of $3,185. Settlement of two road relocation contracts 
resulted in a savings of $9,805. Supplemental recreation 
facilities consisting of an access road and boat 
ramp were completed by contract at a cost of $7,259. 
Regular funds, maintenance: Maintenance work 
performed by contract included stockpiling rock for 
riprap, $25,380; rental of equipment to move an 
existing stockpile, $1,783; painting of tainter gates, 
$27,320; resealing roads, $77,376; and replacement of 
furnace, $180. A landfill bulldozer was procured at a 
cost of $27,190. Purchase of a tractor, pickup, patrol 
boat and trailer, centerline marking machine, and 
miscellaneous office, grounds, reservoir, garage, and 
shop equipment cost $14,773. Routine operation, 
ordinary maintenance, real estate management services, 
engineering and design, and supervision and 
administration cost $280,885. Proceeds from rentals of 
reservoir lands and recreation fees of $8,212 were 
deposited in the U.S. Treasury. Local governmental 
units will be paid 75 percent of the $7,838 received 
from lease rentals. 
Condition at end of fiscal year. Construction of project 
began in October 1952 and is complete. Construction 
of supplemental recreation facilities is underway. 
44. WILSON LAKE, SALINE RIVER, 
KANS. 
Location. Dam is on Saline River about 130 miles 
above its mouth, near eastern edge of Russell County, 
Kansas, about 50 miles west of Salina, 10 miles north of 
Wilson, and 20 miles east of Russell, Kansas. 
Existing project. An earthfill dam about 5,600 feet long 
and 160 feet high with a gated-outlet works, chute 
spillway, and structural provision for irrigation. Total 
reservoir storage capacity is 776,000 acre-feet (511,000 
for flood control, 40,000 for sediment reserve and 225, 
000 multipurpose storage for irrigation and low flow 
regulation). Project is a unit of comprehensive plan for 
flood control and other purposes in Missouri River 
basin, authorized by 1944 Flood Control Act (H. Doc. 
475, and S. Docs. 191 and 247, 78th Cong., 2d sess.). 
Report of Chief of Engineers on justification of Wilson 
Dam and Reservoir, submitted in compliance with 
Public Law 505, 84th Congress, published as Senate 
Document 96, 86th Congress, was approved July 14, 
1960 (Public Law 645, 86th Cong.). Estimated cost 
(1970) is $20,357,023 including $342,000 Code 710 
funds (recreational facilities at completed projects). 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations and results during fiscal year. Regular funds, 
new work: The initial project was completed during 
the fiscal year. Hired labor operations consisted of 
emergency treatment measures by U.S. Forest Service, 
initial inspection and evaluation of the dam and 
623

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
appurtenant structures, preparation of record drawings, 
engineering and design, and supervision and 
administration, cost $3,561. Supplemental recreation 
facilities consisting of planning for roads, camp pads, 
and waterline were initiated at a cost of $1,697. 
Maintenance: Maintenance activities performed by 
contract and hired labor were a high order alinement 
and tilting survey of the dam costing $10,058, and 
purchase and installation of courtesy docks at a cost of 
$5,701. Tree planting and revegetation development 
and maintenance, by contract, cost $15,397. Initiation 
of construction of sandstone drains in the outlet works, 
by hired labor, cost $24,456. Procurement of a landfill 
bulldozer, cost $27,275; and a road patrol grader, $17, 
411. Purchases of two tractors, a mower, and miscellaneous 
grounds, reservoir, and garage equipment, 
cost $8,047. Routine operation, ordinary maintenance, 
real estate management services, engineering and 
design, and supervision and administration, cost $230, 
392. Income from collections for subsistence, quarters, 
services, and crop disposals totaled $6,411. Proceeds 
from rentals of reservoir lands and recreational fees of 
$9,108 were deposited in the U.S. Treasury. Local 
governmental units will be paid 75 percent of the $9, 
101 received from lease rentals. 
Condition at end of fiscal year. Construction of project 
began April 1, 1961, closure of the dam was started on 
December 28, 1964, and project was placed in 
operation January 1, 1965. Project is complete. Land 
acquisition was 21,481 acres in fee simple and 12,526 
acres in flowage and access road easements. Construction 
of supplemental recreation facilities is underway. 
45. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Flood Control Act of June 22, 1936, and subsequent 
acts require local interests to furnish assurances that 
they will maintain and operate certain local protection 
projects after completion in accordance with regulations 
prescribed by the Secretary of the Army. 
District Engineers are responsible for administration of 
these regulations within boundaries of their respective 
District. (See table 20-H on inspection of completed 
flood control projects.) 
Fiscal year cost was $73,498. 
46. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 20-I. 
47. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency flood control activities-repair, flood fighting, and 
rescue work (Public Law 99, 84th Cong., and antecedent 
legislation) 
Federal costs for fiscal year were $90,246 for advance 
preparation, $192,863 for emergency operations, and 
$24,507 for rehabilitation. 
Emergency Bank Protection (Sec. 14, 1946 Flood Control 
Act, Public Law 526, 79th Cong.,July 24, 1946) 
Operations under this heading were as follows: 
DeSoto, Kansas.- Preparation of contract plans and 
specifications for bank protection to alleviate erosion of 
the left bank of the Kansas River at the abutment of a 
recently constructed highway bridge was completed 
and a contract awarded at a cost of $784. 
Easton-Saxton Bridge.- A contract for placing bank 
protection to stop bank erosion on the Platte River that 
was threatening this bridge in Buchanan County, 
Missouri, was completed at a cost of $38,890. 
Hopkins, Missouri.- Plans were prepared for placing 
bank protection to stop bank erosion on One Hundred 
and Two River, a tributary of the Platte River, that 
was threatening the city sewage lagoons. Construction 
was initiated February 27, 1970, and completed April 
8, 1970. Total costs, all Federal, were $12,232. 
Small Flood Control Projects Not Specifically 
Authorized by Congress (Sec. 205, 1948 Flood Control 
Act as amended, Public Law 858, 80th Cong., June 30, 
1948). See detailed reports for operation at Bedford, 
Iowa; Elk Creek at Clyde, Kansas; Stonehouse Creek, 
Kansas; Gypsum, Kansas; and Fairbury, Nebraska. 
Field reconnaissance for proposed projects at two other 
locations were completed at a cost of $950. 
48. SURVEYS 
Fiscal year costs were $18,484 for navigation studies, 
$223,254 for flood control studies, and $17,223 for 
special studies. 
49. COLLECTION AND STUDY OF BASIC 
DATA 
(Flood Plain Management Services) 
Flood Plain Information Reports. 
A major revision and updating of the FPI report on 
the Blue River within Kansas City, Missouri, was 
completed. The report will be presented to local 
interests in Kansas City, Missouri,June 1 and October 
14, 1970. Fiscal year cost for this area was $9,200. 
Work on the report on Little Blue River basin in 
Jackson County, Missouri, was completed. The public 
presentation will be held in Kansas City, Missouri, 
September 8 and October 15, 1970. Fiscal year cost for 
this area was $26,641. 
Flood plain information report was completed on 
Blue River basin in Johnson County, Kansas, and the 
public presentation will be held in Kansas City, 
Missouri, July 6 and September 17, 1970. Fiscal year 
cost for this area was $48,001. 
Hydrology and hydraulic studies for the report on 
Little Blue River at Fairbury, Nebraska, were initiated 
in May 1970. Fiscal year cost for this area was $1,000. 
624

KANSAS CITY, MO., DISTRICT 
Work on the report on Hays, Kansas, was initiated 
in October 1968, and completed late in fiscal year 
1969. The public presentation was held October 16, 
1969, at Hays, Kansas. Fiscal year cost for this area was 
$478. 
Hydrology and hydraulic studies for the report on 
Three Mile Creek, at Leavenworth, Kansas, were 
initiated in April 1970. Fiscal year cost for this area was 
$8,000. 
Work on the report on Beatrice, Nebraska, was 
initiated in February 1970. Fiscal year cost for this area 
was $10,166. 
Technical Services. The Flood Plain Management 
Services unit and Flood Plain Reports section provided 
site investigations and flood hazard evaluations to 
military and nonmilitary Federal agencies, State and 
local governmental agencies, and to individuals and 
businesses, comprising 331 separate inquiries. A special 
flood hazard report, in pamphlet form, was completed 
for Kansas City, Kansas, Jersey Creek basin. Fiscal 
year cost was $65,731. 
Comprehensive Flood Damage Prevention Planning. The 
Wears Creek, Jefferson City, Missouri, survey investigation 
was previously selected in the Missouri 
River Division as a pilot study for more intensive 
treatment of nonstructural alternatives considered for 
surveys nearing completion. Joint studies are continuing 
with other Federal, State, and local agencies 
and work is essentially complete. Osage River, Missouri, 
and Shunganunga Watershed, Topeka, Kansas, 
were the "nonselective" studies. Carry-over FY 1969 
FPMS funds were utilized for the extra effort in 
conducting the nonstructural alternatives. Fiscal year 
cost was $1,182. 
Total fiscal year cost of Flood Plain Management 
Services, including $56,299 cost of the management 
services unit, was $226,698. 
625

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 20-A 
See 
Section 
in Text Project 
1. Missouri River, 
Sioux City, Iowa 
to Mouth (Rulo, 
Nebr., to Mouth) 
(Federal Funds) 
(Contributed 
Funds) 
(Consolidated 
Summary) 
3. Atchison, White 
Clay Creek, 
Kans. 
4. Bedford, East 
Fork 102 
River, Iowa 
5. Brookfield Lake, 
Yellow Creek, 
Mo. 
6. Chariton-Little 
Chariton Basins, 
Mo. 
7. Chariton River, 
Mo. 
8. Clinton Lake, 
Wakarusa 
River, Kans. 
9. Elk Creek, 
Clyde, Kans. 
10. Fairbury, Little 
Blue River, 
Nebr. 
11. Fort Scott Lake, 
Marmaton 
River, Kans. 
12. Grove Lake 
Soldier Creek, 
Kans. 
13. Gypsum, Gypsum 
Creek, Kans. 
14. Harlan County 
Lake, Republican 
River, Nebr. 
COST AND FINANCIAL STATEMENT 
Total to 
Funding FY67 FY68 FY69 FY70 June 30, 1970 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
1,050,000 
1,627,117 
6,394,500 
7,140,088 
1,050,000 
1,627,117 
6,394,500 
7,140,088 
1,100,000 
73,112 
161,000 
352,303 
100,000 
12,274 
790,000 
1,195,907 
850,000 
602,352 
357,500 
60,136 
235,000 
290,553 
200,000 
194,753 
13,500 
22,611 
31,000 
30,128 
161,300 
179,142 
5,863 
100,000 
210,297 
5,550,000 
4,825,399 
61,900 
17,882 
161,900 
228,179 
5,550,000 
4,825,399 
844,000 
819,822 
62,900 
71,459 
100,000 
93,634 
805,000 
1,172,111 
-15,000 
413,191 
4,100 
4,005 
65,000 
21,202 
155,000 
119,275 
300,000 
248,140 
17,782 
186,625 
190,955 
-32,377 
5,119 
3,000,000 
2,723,806 
9,801,927 
6,504,393 
3,000,000 
2,723,806 
9,801,927 
6,504,393 
1,737,000 
1,834,218 
2,491 
9,000 
99,609 
450,000 
691,495 
500,000 
301,436 
5,100 
1,543 
164,464 
64,421 
31,093 
-200 
20,995 
683,000 
620,933 
3,350,000 
2,668,809 
8,020,432 
9,889,654 
44,018 
3,350,000 
2,712,827 
8,020,432 
9,889,653 
1,026,704 
4,058 
5,946 
100,000 
3,483 
1,100,000 
1,423,081 
975,000 
1,224,139 
773 
46,500 
230,414 
4,000 
3,313 
10,140 
14,500 
14,005 
1,912 
216,430 
275,680 
626 
206,448,7901 
205,382,087 
155,238,4962 
152,999,0802 
706,274 
706,274 
22,642 
22,642 
207,155,0644 
206,088,361 
155,238,4965 
152,999,0795 
3,976,000 
3,888,108 
469,958 
467,835 
100,000 
209,000 
209,000 
6,767,090 
6,481,069 
3,005,000 
2,989,739 
403,228 
400,349 
534,002 
490,599 
734,000 
731,338 
575,000 
553,211 
66,000 
65,503 
45,480,832 
45,500,4136 
3,133,215 
3,129,556 
1,017,623 
1,017,623

KANSAS CITY, MO., DISTRICT 
TABLE 20-A (Continued) 
See 
Section 
in Text Project 
15. Harry S. Truman 
Dam & Reservoir 
Osage River, Mo. 
16. Hays, Big 
Creek, Kans. 
17. Hillsdale Lake, 
Big Bull 
Creek, Kans. 
18. Kanopolis Lake, 
Smokey Hill 
River, Kans. 
19. Kansas City, 
Kansas River, 
Kans. (62 Mod.) 
20. Kansas City on 
Missouri & 
Kansas Rivers, 
Mo. & Kans. 
21. Lawrence, Kansas 
River, Kans. 
(Contributed 
Funds) 
(Consolidated 
Summary) 
22. Little Blue River 
Channel Improvement, 
Little Blue River, 
Mo. 
23. Little Blue River 
Lakes, Little Blue 
River, Mo. 
24. Long Branch 
Lake, Little 
Chariton River, 
Mo. 
25. Melvern Lake 
Osage (Marais Des 
Cygnes) River, 
Kans. 
26. Merriam, Turkey 
Creek, Kans. 
27. Milford Lake, 
Republican River, 
Kans. 
28. Missouri River 
Levee System, 
IA., Neb., Kans., 
and Mo. 
1 
COST AND FINANCIAL STATEMENT 
Total to 
Funding FY67 FY68 FY69 FY70 June 30, 1970 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
5,200,000 
5,341,500 
61,251 
194,000 
144,696 
20,000 
60,532 
178,000 
139,503 
109,118 
10,000 
6,021 
9,500,000 
5,245,731 
5,643 
275,000 
319,003 
-1,508 
113 
182,575 
220,517 
375,000 
238,080 
25,000 
25,662 
10,450,000 
9,007,679 
50,000 
8,174 
5,000 
9,223 
30,000 
7,130 
129,000 
125,170 
175,000 
88,487 
2,954 
290,000 
68,151 
290,000 
68,151 
100,000 
25,681 
146,000 
104,387 
600,000 
310,182 
54,000 
78,054 
1,000,000 2,429,307 5,636,000 6,245,703 
688,921 3,106,659 4,976,104 5,654,721 
-60,000 
699 
1,596,000 
4,030,552 
77,500 
68,242 
2,230,000 
2,641,066 
-100,000 
278 
-195,000 
1,362,997 
115,450 
124,526 
1,565,000 
1,428,927 
12 
307,200 
829,422 
334,500 
177,661 
902,000 
598,699 
353 
95,000 
163,230 
391,374 
361,274 
870,000 
980,330 
5,850,000 
8,287,215 
120,000 
94,933 
65,000 
52,930 
55,000 
38,863 
114,524 
120,837 
69,622 
6,276 
627 
105,000 1,130,000 1,364,000 
1,186,617 827,154 1,453,949 
- - 2,900 
105,000 1,130,000 1,070,900 
1,186,617 827,154 1,453,949 
- - 115,000 
13,257 
43,700,000 
38,675,472 
170,000 
170,001 
569,000 
551,617 
12,538,227 
12,546,113 
2,250,509 
2,248,548 
755,000 
572,819 
42,276,510 
42,266,180 
4,257,000 
3,860,797 
2,900 
3,963,900 
3,860,797 
115,000 
13,257 
600,000 
310,182 
300,000 
208,122 
16,761,010 
15,328,650 
40,000 
39,708 
47,683,200 
47,528,693 
918,824 
731,703 
33,173,781 
32,745,230

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 20-A (Continued) 
See 
Section 
in Text Project 
29. Missouri River 
Basin, Kansas 
30. Onaga Lake, 
Kans. 
31. Osawatomie, 
Pottawatomie 
Creek, Kans. 
32. Pattonsburg 
Lake 
Grand River, Mo. 
33. Perry Lake, 
Delaware River, 
Kans. 
34. Platte River, 
Mo. 
35. Pomme De Terre 
Lake, Pomme 
De Terre River, 
Mo. 
36. Pomona Lake, One 
Hundred Ten Mile 
Creek, Kans. 
37. Rathbun Lake, 
Chariton River, Iowa 
38. Smithville Channel, 
Little Platte 
River, Mo. 
39. Smithville Lake, 
LittlPela tte 
River, Mo. 
40. Stockton Lake, 
Sac River, Mo. 
41. Stonehouse 
Creek, Kans. 
42. Topeka, Kansas 
River, Kans. 
COST AND FINANCIAL STATEMENT 
Total to 
Funding FY67 FY68 FY69 FY70 June 30, 1970 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
196,000 174,000 
195,796 174,217 
- 88,000 
- 53,803 
205,000 485,000 
43,619 838,004 
450,000 200,000 
39,085 58,329 
5,275,000 5,920,000 
6,661,633 7,042,711 
190,000 
189,999 
125,000 
57,221 
50,000 
11,585 
6,900,000 
6,960,051 
50,000 
178,832 
172,500 
197,994 
43,415 
125,535 
137,300 
144,438 
5,500,000 
4,367,125 
75,000 
956 
50,000 
44,241 
12,300,000 
11,167,092 
1,100,000 
1,124,386 
97,000 
93,227 
26,000 
40,736 
258,300 
241,675 
7,200 
68,488 
241,500 
237,785 
3,600,000 
4,293,863 
-68,682 75,000 
5,090 103 
185,000 194,000 
149,580 156,743 
10,700,000 13,834,000 
15,524,086 11,759,100 
- 137,000 
- 10,373 
652,332 439,000 
716,290 530,002 
628 
209,703 
205,909 
250,000 
267,264 
900,000 
661,135 
200,000 
31,198 
4,110,001 
4,038,411 
60,934 
59,270 
103,000 
100,312 
3,779 
27,499 
373,987 
262,346 
25,000 
4,005 
279,033 
321,845 
3,000,000 
3,102,993 
31,168 
26,602 
747 
275,000 
308,356 
4,805,000 
7,009,912 
-14,500 
93,830 
695,000 
659,703 
55,5698 
55,5698 
2,045,0239 
2,041,229 
338,000 
321,067 
1,998,200 
1,726,096 
1,000,000 
144,222 
46,524,001 
45,533,542 
60,934 
59,270 
250,000 
218,957 
15,622,599 
15,620,973 
1,536,412 
1,386,216 
13,470,308 
13,446,234 
1,155,333 
1,147,037 
24,194,000 
22,457,323 
31,168 
26,602 
81,318 
6,896 
704,000 
658,920 
64,038,500 
61,279,520 
265,057 
246,760 
19,418,183 
19,164,778 
50,000 
25,418 
84,000 
64,967 
221,825 
204,182 
104,693 
67,968 
232,000 
194,261 
3,335,000 
3,736,280

TABLE 20-A (Continued) 
KANSAS CITY, MO., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
43. Tuttle Creek Lake, New Work: 
Big Blue Approp. 136,975 92,000 5,000 16,000 80,252,755 
River, Kans. Cost 165,394 65,278 79,532 639 80,192,020 
Maint. 
Approp. 190,900 266,075 416,000 493,508 1,983,453 
Cost 181,958 255,247 293,547 454,887 1,791,134 
44. Wilson Lake, New Work: 
Saline River, Approp. - - - 3,023 20,025,023 
Kans. Cost 295,743 83,952 90,037 5,258 20,016,721 
Maint. 
Approp. 151,000 127,100 259,300 273,396 992,996 
Cost 148,489 155,666 191,749 332,326 984,231 
45. Inspection of Maint. 
Completed Approp. 13,000 13,000 28,000 75,585 238,475 
Flood Control Cost 13,320 19,938 28,014 73,498 236,387 
Projects 
1. Includes $8,665,594 costs of new work for previous 6. Includes cost of materials furnished without charge in the 
project. amount of $24,198. 
2. Includes $200,000 Fiscal Year 1968 Supplemental Appro- 7. Includes cost of materials furnished without charge in the 
priation Funds and $738,109 for maintenance of previous amount of $7,885. 
project. 8. Covers 96X3122 construction, general, funds allotted to 
3. Includes $8,665,594 for new work for previous project the 'Republican River Basin Reservoirs (Medicine Creek Reserand 
$750,292 from contributed funds. voir), Colo., Nebraska, and Kansas.' 
4. Includes $8,665,594 for new work for previous project 9. Covers 96X3123 operation and maintenance, general, 
and $706,274 from contributed funds. funds allotted to 'Scheduling of Flood Control Reservoir 
5. Includes $738,109 for maintenance of previous project, Operations.' 
$22,642 from contributed funds and $200,000 Fiscal Year 1968 
Supplemental Appropriation Funds. 
MISSOURI RIVER, SIOUX CITY, IOWA, TO MOUTH 
(RULO, NEBR., TO MOUTH) 
TOTAL COST OF EXISTING PROJECT TO JUNE 30, 1970 
TABLE 20-B (See Section 1 of Text) 
Funds New Work Maintenance Total 
Regular $177,172,748 $150,763,129 $327,935,877 
Emergency relief 2,362,599 190,401 2,553,000 
Public works 17,181,146 114,180 17,295,326 
Accelerated public works - 393,261 393,261 
Maintenance and operation of - 800,000 800,000 
dams and other improvements 
of navigable waters 
Total $196,716,493 $152,260,971 $348,977,464 
629

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 25, 1912 
Aug. 8, 1917 
Mar. 3, 1925 
Jan. 12, 1927 
July 3, 1930 
Aug. 30, 1935 
Mar. 2, 1945 
June 22, 1936 
Dec. 22, 1944 
July 24, 1946 
Sept. 3, 1954 
Aug. 18, 1941 
Dec. 22, 1944 
June 28, 1938 
Aug. 18, 1941 
Dec. 22, 1944 
July 24, 1946 
May 17, 1950 
MISSOURI RIVER, SIOUX CITY, IOWA, TO MOUTH 
(RULO, NEBR., TO MOUTH) (See Section 1 of Text) 
Project adopted for securing a permanent navigable 
channel of 6-foot depth. 
Fixed upstream limit of improvement at upper 
end of Quindaro Bend (374.8 miles from mouth) and 
provided for dredging. 
For a minimum width of 200 feet, with a reasonable 
additional width around bends. 
Appropriation of $12 million authorized for existing 
project. 
Appropriation of $15 million additional authorized; 
additional allotments totaling $29,153,108 were 
made by Public Works Administration under provisions 
of National Industrial Recovery Act of 1938, and 
$9,669,791 allotted under provisions of Emergency 
Relief Appropriation Act of 1935. 
Completion of improvement from mouth to Sioux 
City, Iowa. 
Securing a navigable channel of 9-foot depth and 
a minimum width of 300 feet. 
KANSAS CITYS ON MISSOURI AND KANSAS RIVER, 
MO. AND KANS. (See Section 18 of Text) 
Levees and floodwalls for protection of Kansas Citys, 
at an estimated construction cost not to exceed 
$10 million, estimated cost of lands and damages 
$8 million. 
Modified and extended project to provide construction 
of cutoffs and protection for additional areas at an 
estimated additional cost of $8,445,000. 
Authorized Chief of Engineers to include necessary railroad 
bridge and approach alterations as a Federal 
responsibility. 
Alternate plan of improvement proposed by local interests 
for Armourdale unit (downstream section). 
MISSOURI RIVER LEVEE SYSTEM, IA., NEBR., KANS., 
AND MO. (See Section 27 of Text) 
Levees along both sides of river from Sioux City 
to Kansas City. 
Extended project from Kansas City to the mouth 
provided for increased protection. 
MISSOURI RIVER BASIN (KANSAS CITY DIST.) 
(See Section 28 of Text) 
Adopted general comprehensive plan for Missouri 
River Basin and authorized $9 million for initiation 
and partial accomplishment. 
Modified general comprehensive plan to include Harlan 
County Dam and Reservoir on Republican River, Nebr. 
other supplemental flood control works on upper 
Republican River, and authorized $7 million additional 
expenditure. 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $200 million additional 
expenditure. 
Additional expenditure of $150 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
Additional expenditure of $250 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
630 
TABLE 20-C 
H. Doc. 1287, 61st Cong., 
3d sess. (contains latest 
published map). 
H. Doc. 463, 64th Cong., 
1st sess. (contains latest 
published map). 
H. Doc. 1120, 60th Cong., 
2d sess. 
H. Doc. 238, 73d Cong., 
2d sess. (contains latest 
published map). 
H. Doc. 214, 76th Cong., 
1st sess. (contains latest 
published map). 
H. Doc. 195, 73d Cong., 
2d sess. 
H. Doc. 342, 78th Cong., 
1st sess. 
H. Doc. 821, 76th Cong., 
3d sess. 
H. Doc. 475 and S. Docs. 191 and 
347, 78th Cong., 2d sess. 
Flood Control Committee 
Doc. 1, 75th Cong., 
1st sess.1 
H. Doc. 842, 76th Cong., 
3d sess. 1 
H. Doc. 475 and S. Docs. 191 and 
247, 78th Cong., 2d sess. 1

TABLE 20-C (Continued) 
KANSAS CITY, MO., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Sept. 3, 1954 Expended general comprehensive plan for Missouri River H. Docs. 642 and 549, 81st Cong. 
Basin and authorized $217,710,000 additional 2d sess.1 
expenditure. 
May 2, 1956 Modified general comprehensive plan for Missouri River 
Basin by deletion of construction of Red Willow Dam and 
Reservoir, Nebr., and addition of construction of Wilson 
Dam and Reservoir, Kans. 
July 3, 1958 Expanded general comprehensive plan for Missouri River H. Doc. 409, 84th Cong., 
Basin and authorized $200 million additional 2d sess.1 
expenditure. 
July 14, 1960 Additional expenditure of $207 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
Dec. 30, 1963 Additional expenditure of $80 million for prosecution of 
general comprehensive plan for Missouri River Basin and 
modified plan to include bank protection or rectification 
works below Garrison Dam. 
June 18, 1965 Additional $116 million for prosecution of general 
comprehensive plan for Missouri River Basin. 
May 12, 1967 Additional $20 million for prosecution of general 
comprehensive plan for Missouri River Basin. 
Aug. 13, 1968 Additional $38,000,000 for prosecution of general 
comprehensive plan for Missouri River Basin. 
1. Contains latest published maps of Missouri River Division. 
631

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
MISSOURI RIVER SIOUX CITY TO MOUTH: TERMINAL FACILITIES 
(See Section 1 of Text) 
Miles 
Description of Facility1 Above Bank Nearest Town 
Mouth2 
Existing facilities: 
Grain loading facility 488.0 
Transfer of sand and gravel 460.4 
Transfer of sand and gravel 449.0 
Government material yard 448.1 
Grain loading 447.8 
Transfer of sand and gravel 447.5 
Grain loading facility 446.0 
Chemical unloading 445.43 
Fertilizer unloading 423.2 
Grain loading facility 423.1 
Bulk handling facilities, publicly owned privately operated 422.9 
Sand and gravel transfer 422.7 
Loading dock 421.1 
Grain wharf 396.1 
Fertilizer unloading and loading 396.05 
Sand and gravel transfer 395.8 
Shipyard and ways for manufacturing, repairing and launching floating equipment 395.7 
Grain loading facility 386.5 
Grain loading facility 386.4 
Loading dock 386.2 
Pipe unloading and storage 382.1 
Transfer of sand and gravel 377.5 
Docking facilities 376.4 
Government-owned bulk petroleum storage 376.3 
Loading dock 375.6 
Oil loading (standby) 373.1 
Grain loading conveyor and dock 373.0 
Transfer of sand and gravel 371.4 
Nitrogen fertilizer solutions 368.2 
Grain loading, conveyor, and dock 367.7 
Warehouse, bulk handling dock and unloading platform 367.1 
Grain loading 367.0 
Scrap steel loading 366.9 
Loading dock 366.1 
Warehouse and loading platform 365.9 
Transfer of sand and gravel 365.7 
Transfer of sand and gravel 365.4 
Grain loading 364.2 
Fuel loading 364.1 
Grain loading 361.6 
Grain loading 361.0 
Barge docking 360.6 
General purpose dock, transfer and storage of pipe and steel 360.1 
Transfer of sand and gravel 360.0 
Steel products 357.6 
Oil unloading 356.6 
Right 
Left 
Left 
Left 
Left 
Left 
Left 
Left 
Right 
Right 
Right 
Left 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Left 
Left 
Left 
Left 
Right 
Right 
Left 
Right 
Right 
Right 
Right 
Right 
Left 
Right 
Right 
Right 
Right 
Right 
Left 
Left 
Left 
Left 
Left 
Right 
Right 
White Cloud, Kans. 
Amazonia, Mo. 
St. Joseph, Mo. 
St. Joseph, Mo. 
St. Joseph, Mo. 
St. Joseph, Mo. 
St. Joseph, Mo. 
St. Joseph, Mo. 
Atchison, Kans. 
Atchison, Kans. 
Atchison, Kans. 
Winthrop, Mo. 
Atchison, Kans. 
Leavenworth, Kans. 
Leavenworth, Kans. 
S. Leavenworth, Kans. 
S. Leavenworth, Kans. 
Wolcott, Kans. 
Wolcott, Kans. 
Wolcott, Kans. 
Pomeroy, Kans. 
Parkville, Mo. 
Parkville, Mo. 
Parkville, Mo. 
Parkville, Mo. 
Kansas City, Kans. 
Kansas City, Kans. 
N. Kansas City, Mo. 
Kansas City, Kans. 
Kansas City, Kans. 
Kansas City, Mo. 
Kansas City, Mo. 
Kansas City, Mo. 
Kansas City, Mo. 
Kansas City, Mo. 
Kansas City, Mo. 
Kansas City, Mo. 
Kansas City, Mo. 
Kansas City, Mo. 
Kansas City, Mo. 
Randolph, Mo. 
Kansas City, Mo. 
Randolph, Mo. 
Kansas City, Mo. 
Sugar Creek, Mo. 
Sugar Creek, Mo. 
632 
TABLE 20-D

KANSAS CITY, MO., DISTRICT 
MISSOURI RIVER SIOUX CITY TO MOUTH: TERMINAL FACILITIES 
(See Section 1 of Text) 
Description of Facility1 
Fertilizer unloading 
Cement loading 
Fuel loading 
Transfer of sand and gravel 
Dock (Company) 
Coal unloading 
Fuel loading 
Government material yard 
Grain loading 
Transfer of sand and gravel 
Transfer of sand and gravel 
Grain loading 
Grain loading 
Grain loading 
Government yard 
Transfer of sand and gravel 
Grain loading 
Transfer of sand and gravel 
Grain loading 
Grain loading 
Grain loading 
Transfer of sand and gravel 
Government material yard 
Grain elevator, conveyor and dock 
General purpose wharf 
Transfer of sand and gravel 
Bulk handling 
Transfer of sand and gravel 
Transfer of sand and gravel 
Transfer of sand and gravel 
Transfer of sand and gravel 
Oil unloading 
Transfer of sand and gravel 
Bulk handling 
Transfer of sand and gravel 
Transfer of sand and gravel 
Coal unloading 
Transfer of sand and gravel 
Boatyard and launching ways 
Transfer of sand and gravel 
Transfer of sand and gravel 
Transfer of sand and gravel 
Transfer of sand and gravel 
Transfer of sand and gravel 
Transfer of sand and gravel 
Transfer of sand and gravel 
Transfer of sand and gravel 
Miles 
Above 
Mouth2 
355.7 
354.8 
354.8 
352.8 
345.3 
336.4 
334.8 
328.6 
318.2 
317.9 
317.2 
317.21 
313.2 
293.2 
293.3 
293.1 
293.0 
286.9 
270.0 
262.7 
249.3 
226.6 
226.4 
226.4 
197.9 
197.0 
196.8 
186.4 
180.6 
157.4 
154.8 
148.6 
143.6 
143.6 
143.5 
124.5 
117.1 
114.1 
104.7 
96.9 
85.3 
68.2 
68.1 
59.9 
52.5 
43.8 
40.1 
Bank Nearest Town 
Right Sugar Creek, Mo. 
Right Sugar Creek, Mo. 
Right Sugar Creek, Mo. 
Left Independence, Mo. 
Left Missouri City, Mo. 
Right Sibley, Mo. 
Left Orrick, Mo. 
Right Napoleon, Mo. 
Right Lexington, Mo. 
Right Lexington, Mo. 
Left Lexington, Mo. 
Left Lexington, Mo. 
Left Lexington, Mo. 
Right Waverly, Mo. 
Right Waverly, Mo. 
Right Waverly, Mo. 
Right Waverly, Mo. 
Left Carrollton, Mo. 
Left Wakenda, Mo. 
Right Miami, Mo. 
Left Brunswick, Mo. 
Left Glasgow, Mo. 
Left Glasgow, Mo. 
Left Glasgow, Mo. 
Right Boonville, Mo. 
Right Boonville, Mo. 
Right Boonville, Mo. 
Left Rocheport, Mo. 
Left Huntsdale, Mo. 
Right Marion, Mo. 
Left Hartsburg, Mo. 
Left Jefferson City, Mo. 
Right Jefferson City, Mo. 
Left Jefferson City, Mo. 
Left Jefferson City, Mo. 
Left Jefferson City, Mo. 
Right Chamois, Mo. 
Left Portland, Mo. 
Right Gasconade, Mo. 
Left Herman, Mo. 
Left Herman, Mo. 
Right Washington, Mo. 
Right Washington, Mo. 
Right Labadie, Mo. 
Right Augusta, Mo. 
Right Chesterfield, Mo. 
Right Chesterfield, Mo. 
633 
TABLE 20-D (Cont'd)

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
MISSOURI RIVER SIOUX CITY TO MOUTH: TERMINAL FACILITIES 
TABLE 20-D (Cont'd) (See Section 1 of Text) 
Miles 
Description of Facility1 Above Bank Nearest Town 
Mouth2 
Transfer of sand and gravel 40.0 Right Chesterfield, Mo. 
Transfer of sand and gravel 29.0 Right St. Charles, Mo. 
Transfer of sand and gravel 28.0 Right St. Charles, Mo. 
Transfer of sand and gravel and bulk cargo dock 27.9 Right St. Charles, Mo. 
Transfer of sand and gravel 17.1 Right St. Louis, Mo. 
Marine railway 8.6 Right Ruegg, Mo. 
Transfer of sand and gravel 8.5 Right Ruegg, Mo. 
1. Privately owned and operated unless indicated. 
2. 1960 adjusted mileage. 
TABLE 20-E OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 2 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Fort Leavenworth Bridge removal 1965 270,393 
Gasconade River, Mo. 1 '2 1931 139,003 85,077 
Osage River, Mo., lock and dam3 1952 658,076 850,495 
1. Improvement adequate for existing needs. Project for 
maintenance only. 
2. Curtailment of project in H. Doc. 467, 69th Cong., Ist 
Sess.
3. Operation of lock and dam placed in standby status. 
634

KANSAS CITY, MO., DISTRICT 
MISSOURI RIVER LEVEE SYSTEM 
TABLE 20-F (See Section 28 of Text) 
Unit 
R 513-512 Richardson Co. D. D. #7 
R 500 Iowa Point D. D. #4 
Kimsey Holly Creek 
L 497 Forest City L. D. 
L 488 Holt Co. D. D. #7 
R 482 Burr Oak D. D. #3 
L 476 Amazonia L. D. 
R 471-460 Elwood-Gladden L. D. 
L 455 S. St. Joseph L. D. 
L 448-443 Halls L. D. 
R 440 Atchison & Doniphan Co. D. D. 
408.2 Leavenworth, Kans R.R. bridge 
L 408 Farley-Beverly D. D. 
L 400 Waldron L. D. 
L 385 Riverside-Quindaro D. D. 
R 351 Atherton L. D. 
L 345-330 Orrick L.D. 
L 325-319 Henrietta-Crooked River D. D. 
L 246 Brunswick-Dalton D. D. 
L 15 North Point L. D. 
Remaining units 
Miles of 
Levee 
19.1 
4.1 
1.7 
13.4 
11.5 
8.3 
5.7 
14.5 
15.6 
16.8 
10.6 
12.5 
7.4 
6.5 
13.4 
43.4 
35.0 
20.0 
40.0 
Status 
Complete 
Complete 
Underway 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Design memorandum complete 
Underway 
Complete 
Preliminary planning underway 
Complete 
Initial contract plans complete 
Planning underway 
Planning underway 
Planning underway 
Detailed planning not initiated 
635

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
KANSAS CITY DISTRICT PROJECTS INCLUDED IN COMPREHENSIVE PLAN 
(See Section 29 of Text) 
Project 
Abilene, Smoky Hill River, Kansas 
Arlington Reservoir, Gasconade River, Missouri1 
Bartley, Republican River, Nebraska 
Beatrice, Big Blue River, Nebraska2 
Fort Scott Reservoir, Marmaton River, Kansas 
Garnett Reservoir, Pottawatomie Creek, Kansas 4 
Hackleman Corners Reservoir, Cedar Creek, Missouri2 
Harlan County Reservoir, Republican River, Nebraska 
Hillsdale Reservoir, Big Bull Creek, Kansas 
Indianola, Republican River, Nebraska 
Kanopolis Reservoir, Smoky Hill River, Kansas 
Harry S. Truman Dam and Reservoir, Osage River, Missouri 
Lawrence, Kansas River, Kansas 
Manhattan, Kansas River, Kansas 
Melvern Reservoir, Osage (Marais des Cygnes) River, Kansas 
Merriam, Turkey Creek, Kansas4 
Milford Reservoir, Republican River, Kansas 
Missouri River Levee System, Rulo to the Mouth 3 
Osawatomie, Osage (Marais des Cygnes) River, Kansas 
Ottawa, Osage (Marais des Cygnes) River, Kansas 
Perry Reservoir, Delaware River, Kansas 
Pioneer Reservoir, Arikaree River, Colorado and Kansas1 
Pomme de Terre Reservoir, Pomme de Terre R., Missouri 
Pomona Reservoir, Osage River Basin, Kansas 
Richland Reservoir, Gasconade River, Missouri 
Salina, Smoky Hill River, Kansas 
Stockton Reservoir, Sac River, Missouri 
Topeka, Kansas River, Kansas 
Tuttle Creek Reservoir, Big Blue River, Kansas 
Wilson Reservoir, Saline River, Kansas 
1. 1954 estimate. 
2. 1960 estimate. 
3. Active portion of project. Deferred portion of project is currently estimated to cost (1964) $228,608,000 Federal and $19,986,000 non- 
Federal. 
4. 1969 estimate 
636 
TABLE 20-G 
Estimated 
Federal 
Cost 
$ 1,099,350 
27,200,000 
118,269 
685,000 
27,500,000 
38,600,000 
18,100,000 
46,911,155 
34,100,000 
67,275 
12,653,735 
276,000,000 
7,200,000 
2,488,585 
33,900,000 
1,430,000 
49,492,200 
104,020,000 
2,038,200 
4,462,661 
48,226,000 
20,000,000 
17,096,092 
14,152,908 
33,300,000 
3,878,668 
73,000,000 
21,100,000 
80,522,068 
20,357,023 
Estimated 
Non-Federal 
Cost 
$ 287,000 
9,500 
524,000 
7,592 
1,200,005 
265,000 
1,150,000 
10,400,000 
370,000 
876,000 
1,960,000 
11,600,000

KANSAS CITY, MO., DISTRICT 
INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 45 of Text) 
637 
451-584 0-72-41 
TABLE 20-H 
Location 
Missouri River levees R513-512, R500, L497, L488, R482, L476, 
L455, L448-443, R440,L400, R351, and R471-460 
Kansas Cities-Argentine, Armourdale, Birmingham CID Kansas and 
Missouri, upper and lower Fairfax, North Kansas City, airport, 
and East Bottoms units 
New Haven, Mo., and mouth of Osage diversion levee 
Ottawa, Kans. 
Grand River at Brunswick, Mo. 
Topeka, Kans., Auburndale waterworks, North and South Topeka units 
Manhattan, Kans. 
Lawrence, Kans. 
Stonehouse Creek, Kans., channel improvement 
Eudora bridge protection 
Big Stranger Creek, Kans. 
Republican River, Bartley, Nebr. 
Indianola, Nebr. 
McCook, Nebr. 
Elk Creek, Clyde, Kans. 
Smoky Hill, Solomon, Kans., bridge protection 
Abilene, Kans. 
Saline, Kans. 
Salt Creek, Barnard, Kans. 
Blue River, Seward, Nebr. 
Mouth of Delaware River 
Frankfort, Kans. 
Chariton River 
Inavale, Nebr. 
DeSoto Bridge Protection 
Clyde, Kans. 
Osawatomie, Kans. 
Bedford, Iowa 
Platte River-Easton-Saxton bridge protection 
Hopkins, Missouri 
Ft. Riley, Kans. 
St. Joseph, Mo. Cut-off 
Fairbury, Nebr. 
Atchison, Kans. 
Month Inspected 
Oct.-Nov., Apr. 
and May 
Nov.-Dec., 
May-June 
Nov. and May 
Sept. and Mar. 
Nov. and May 
Oct. and Apr. 
Sept. and Mar. 
Mar. and Sept. 
Oct. and Apr. 
Sept. and Mar. 
Nov. and June 
Oct. and Apr. 
Oct. and Apr. 
Oct. and Apr. 
Sept.-Mar. 
Oct. and Apr. 
Sept. and Apr. 
Oct. and Apr. 
Oct. and Apr. 
Oct. and Apr. 
Sept. and Mar. 
Sept. and Mar. 
Nov. and May 
Oct. and Apr. 
Sept. and Mar. 
Sept. and Mar. 
Sept. and Mar. 
Sept. and Mar. 
Sept. and Mar. 
Sept. and Mar. 
Sept. and Mar. 
Oct. and Apr. 
Oct. and Apr. 
Nov. and May

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 20-I OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 46 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Abilene, Kans.1 1965 1,099,350 
Arlington Lake, Mo. 2 1948 8,651 
Bartley, Nebr.1 1953 118,269 
Beatrice, Big Blue River, Nebr. 1965 16,317 
Big Blue River, Seward, Nebr. 1 ,4 126,887 
Big Stranger Creek, Kans.1 
'4 - 337,131 
Braymer Lake, Shoal Creek, Mo. 1966 - 
Brookfield Lake, Yellow Creek, Mo. 1966 
Dry Fork and East Fork Lake, Fishing 
River, Mo. 1966 
East Muddy Creek, Mo. 1966 - 
Elk Creek, Clyde, Kans.1 ,4 - 394,028 
Frankfort, Black Vermillion River, Kans. 1966 - 
Garnett Lake, Pottawatomie Creek, Kans. 
Heckleman Corners Lake, Cedar Creek, Mo.3 
Indianola, Nebr.1 1950 67,275 
Lower Grand River, Mo. 1966 - 
Manhattan, Kansas River, Kans. 1967 2,488,585 
Mercer Lake, Weldon River, Mo. 1966 - 
Missouri River at New Haven, Mo.1,'4 - 140,000 
Ottawa, Osage (Marais des Cygnes) River, Kans. 1966 4,462,660 
Pioneer Lake, Kans.2 1952 95,692 
Republican River near Inavale, Nebr.1 - 32,672 
Richland Lake, Mo. 2 1948 8,548 
Salina, Smoky Hill River, Kans.1 1967 3,878,668 
Salt Creek, Barnard, Kans.1 ,4 - 127,880 
Trenton Lake, Thompson River, Mo. 1966 - 
Upper Grand River, Mo. 1966 
1. Completed. 4. Authorized by the Chief of Engineers under section 205, 
2. Inactive. Public Law 858, 80th Congress, as amended. 
3. Deferred for restudy. 5. Deauthorized for lack of local cooperation. 
638

OMAHA, NEBR., DISTRICT* 
This district comprises portions of Montana, Wy- drainage basin of Missouri River along main stem and 
oming, North Dakota, South Dakota, Colorado, tributaries to Rulo, Nebr. 
Nebraska, Iowa, and Minnesota, all embraced in 
IMPROVEMENTS 
Navigation Page 
1. Fort Peck Lake, Mont. ......................... 639 
2. Missouri River, Sioux City, Iowa to 
Rulo, Nebr. ..................................... 640 
3. Small Navigation Project, Sioux City, 
Iow a ........................................................ 640 
4. Other Authorized Navigation Projects .. 641 
Flood Control 
Bear Creek Lake, Colo. ....... .............. 
Big Sioux River at Sioux City, Iowa 
and S. Dak. ......... .......................... 
Billings, Mont. ..................................... 
Blackbird Creek, near Macy, Nebr. ..... 
Bowman-Haley Lake, N. Dak. .............. 
Chatfield Lake, Colo. ............................ 
Cherry Creek Lake, Colo. ................... 
Davids Creek Lake, Iowa ..................... 
Fall River Basin, S. Dak ...................... 
Floyd River, Sioux City, Iowa ............... 
Gering Valley, Nebr .............................. 
Great Falls, Mont ................................... 
Ida Grove, Iowa .................................... 
Linton, N. Dak. ...................... ........... 
Little Nemaha River, Nebr. ............... 
Little Papillion Creek, Nebr. .............. 
Little Sioux River and Tributaries, 
Iow a .......................... ......... ........... 
22. Loup River, Columbus, Nebr. ................ 
23. Missouri River Basin (Omaha Dist.) .... 
24. Missouri River, Garrison Dam to Lake 
Oahe, N. Dak ..................................... 
25. Missouri River, Kenslers Bend, Nebr. 
to Sioux City, Iowa ........................... 
"26. Missouri River Levee System, Sioux 
City, Iowa to Mouth (Sioux City, 
Iowa to Rulo, Nebr.) ......................... 
641 
27. 
28. 
29. 
30. 
31. 
32. 
33. 
34. 
35. 
GPL: 
641 36. 
641 
642 37. 
642 
642 38. 
64; 
643 39. 
643 
644 40. 
66CA 
Flood Control (cont.) Page 
Mud Creek, Broken Bow, Nebr ......... 647 
Norfolk, Nebr. ..................................... 647 
Papillion Creek and Tributaries, Nebr. 648 
Pipestem Lake, N. Dak. ........................ 648 
Salt Creek and Tributaries, Nebr. ........ 648 
Schuyler, Nebr. ..................................... 649 
Sheridan, Yellowstone River, Wyo. ....... 649 
Vaughn, Mont .................................... 649 
Waterloo, Nebr. ................. .... 649 
Inspection of Completed Flood Control 
Works ........................................ 650 
Scheduling Flood Control Reservoir 
Operations ..................................... 650 
Other Authorized Flood Control 
Projects ..................................... 650 
Flood Control Work Under Special 
Authorization ..................................... 650 
South Platte River Basin, Colo. ............ 650 
4U-l Multiple Purpose Projects Including Power 
644 41. Big Bend Dam-Lake Sharpe, Missouri 
645 River Basin, S. Dak. .................... 650 
645 42. Fort Randall Dam-Lake 'rancis Case, 
645 Missouri River Basin, S. Dak. ........... 651 
645 43. Garrison Dam-Lake Sakakawea, 
Missouri River Basin, N. Dak. .......... 651 
646 44. Gavins Point Dam-Lewis and Clark 
646 Lake, Missouri River Basin, Nebr. 
646 and S. Dak ............................................ 651 
45. Oahe Dam-Lake Oahe, Missouri River 
646 Basin, S. Dak. and N. Dak. ........... 652 
646 
46. 
47. 
647 48. 
General Investigations 
Surveys ..................................... 652 
Collection and Study of Basic Data ..... 652 
Research and Development .................... 652 
NAVIGATION 
1. FORT PECK LAKE, MONT. 
Location. Reservoir is in Missouri River Valley in 
McCone, Valley, Garfield, Phillips, Petroleum, and 
Fergus Counties, Mont. Dam is approximately 1,771.5 
miles above mouth of Missouri River. Nearest towns 
are Glasgow, 17 miles northwest, and Nashua, 9 miles 
north. 
Existing project. A hydraulic earthfill dam with a 
maximum height of 250.5 feet and a reservoir for flood 
control, irrigation, navigation, hydroelectric power, 
and other purposes, with a gross storage capacity of 19, 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
639 
5. 
6. 
7. 
8. 
9. 
10. 
11. 
12. 
13. 
14. 
15. 
16. 
17. 
18. 
19. 
20. 
21.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
100,000 acre-feet at maximum operating pool. See 
page 818 of 1965 Annual Report and page 905 of 1958 
Annual Report for project details. Estimated cost of 
overall project (July 1970) is $157,515,560 including 
$964,000 Code 710 funds. 
Local cooperation. None required. 
Terminal facilities. None. 
Operation and results during fiscal year. Regular funds, 
new work: Design was continued for additional 
recreation facilities. Construction of the access road to 
Hell Creek recreation area was completed. Regular 
funds, maintenance: Design studies continued for road 
improvements and spillway repair. Construction of 29 
houses and chapel was initiated. Contract for road 
resurfacing initiated. Construction completed on intake 
bulkhead and spillway slope excavation. Fort 
Peck Lake was operated in conjunction with the other 
Missouri River reservoirs for flood control, navigation, 
power production, and other multiple-purpose uses. 
Reservoir releases amounted to approximately 8,325; 
000 acre-feet, or an average discharge of 11,500 cubic 
feet per second. Generating facilities produced 1,407, 
152,000 kilowatt-hours of electricity. Total cost of 
Operation and Maintenance during the Fiscal Year 
was $2,544,500; however, reimbursement from the 
Bureau of Reclamation for the pro rata share cost of 
Operation and Maintenance of the powerplant, 
reimbursement for furnishing operators' village facilities, 
and property disposals reduced net cost to $1, 
654,500. 
Condition at end of fiscal year. Work started on original 
project in October 1933 and on second power plant in 
August 1956. The project is complete. Additional 
recreational facilities are being constructed utilizing 
Code 710 funds. On 30 June 1970, the pool was at 
elevation 2247.0 and 18,386,000 acre-feet of water was 
impounded in the reservoir. 
2. MISSOURI RIVER, SIOUX CITY, 
IOWA TO RULO, NEBR. 
Location. Jefferson, Madison, and Gallatin Rivers 
conjoin at Three Forks, Mont., to form Missouri River, 
which flows southeasterly 2,315.1 miles (1960 mileage) 
across or along seven states to Mississippi River, 17 
miles above St. Louis. River is boundary between states 
of Missouri, Kansas, Nebraska, and Iowa. For description 
see page 1149, Annual Report for 1932. 
Previous projects. For details see page 1893, Annual 
Report for 1915, and page 1175, Annual Report for 
1938. 
Existing Project. Provides for a channel of 9-foot depth 
and width not less than 300 feet, to be obtained by 
revetment of banks, construction of rock dikes to 
contract and stabilize waterway, cutoffs to eliminate 
long bends, closing minor channels, removal of snags 
and dredging as required. Estimated cost of new work 
Sioux City to Rulo, Nebr. (July 1970) is $188,350,000, 
exclusive of amounts expended on previous projects. 
(See table 21-C for authorizing legislation, and table 
21-E for Terminal Facilities.) 
Operations and results during fiscal year. Regular Funds, 
New Work: Consisted of construction, by contract, of 
18,726 linear feet of dikes and 28,454 linear feet of 
stone fill revetments; construction of one river site 
recreational area and initiated and completed; no new 
work construction was accomplished with hired labor 
forces. 
Regular Funds, Maintenance: Consisted of construction, 
by contract, of restoring and replacement of 
69,834 linear feet of dikes and 106,112 linear feet of 
stone fill revetments. Work by hired labor forces 
consisted of removal of 63,600 cubic yards of point 
removal for channel correction; 37,800 tons of stone 
was salvaged from obsolete structures and used to 
repair 12,600 linear feet of dikes and revetments and 
64,872 cubic yards of obstructions in the channel were 
removed and placed out of the designed channel. 
Condition at end of fiscal year. Construction was initiated 
on this section of the project (Sioux City to Rulo) in 
fiscal year 1928; and the scheduled completion date is 
fiscal year 1973 for Bank Stabilization and fiscal year 
1975 for the Recreation Feature. The work was 
approximately 95.6 percent complete at end of the 
fiscal year. Work remaining to complete this section of 
project (Sioux City to Rulo) consists of construction of 
additional bank stabilization structures, strengthening 
of existing structures to improve their effectiveness and 
to prevent their deterioration prior to final stabilization 
of banks, refinement construction consisting of minor 
dike and revetment extensions and underwater sills to 
redistribute flow velocities, in order to develop more 
stable navigation project dimensions, and construction 
of recreation facilities. A reliable channel suitable for 
navigation is available through this section. Controlling 
depth at ordinary stages of the river is 8 1/2 feet, 
with additional depths available during high stages. 
Commercial navigation was inaugurated on this 
section in May 1939, and common carrier transportation 
service was inaugurated in October 1946. Six 
river side recreational sites are completed and in 
operation, two of these are proposing to enlarge their 
areas to provide camping facilities. (See table 21-B for 
total cost of work under existing project to June 30, 
1970.) 
3. SMALL NAVIGATION PROJECT 
SIOUX CITY, IOWA 
Location. Left bank Missouri River at Sioux City, 
Iowa. 
Existing Project. There are no existing federal harbors 
for small craft at or near Sioux City, Iowa. A small, 
private boat harbor has been developed on the 
Nebraska (right bank) side of the river near South 
Sioux City. A small boat harbor project was authorized 
for construction by Chief of Engineers on 16 November 
1966, under authority provided by Section 107, 1960 
River and Harbor Act. Estimated cost is $175,600 (July 
1969) of which $46,100 is Federal and $129,500 non- 
Federal. 
640

OMAHA, NEBR., DISTRICT 
Local Cooperation. Local requirements were provided 
in accordance with provisions of Section 107 of the 
River and Harbors Act of 1960. 
Operation and Results During Fiscal Year. Project 
completed. 
Condition at End of Fiscal Year. Project completed. 
4. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 21-D.
FLOOD CONTROL 
5. BEAR CREEK LAKE, COLO. 
Location. Damsite is on Bear Creek in Jefferson 
County, Colorado about 8 miles above the confluence 
of Bear Creek with the South Platte River at Denver. 
Existing project. Project consists of an earthfill dam 
162 feet high, with a crest length of about 4,400 feet, 
and a supplementary earthfill dike with a height of 50 
feet and a crest length of 2,700 feet, to the south of the 
main dam, and an uncontrolled earth and rock-cut 
emergency spillway. The lake will provide storage 
capacity of 28,400 acre-feet for flood control and 
recreation. Authorized by 1968 Flood Control Act 
(Senate Document 87, 90th Congress). Estimated cost 
is $41,900,000 (July 1970) of which $2,030,000 is future 
non-Federal reimbursement for recreation cost sharing. 
Other non-Federal costs, for acquisition of water for 
recreation pool, are estimated at $400,000. 
Local cooperation. Local interests will be required to: a. 
In accordance with the Federal Water Project Recreation 
Act: (1) administer land and water areas for 
recreation and fish and wildlife enhancement; (2) pay, 
contribute in kind, or repay with interest, one-half of 
the separable cost allocated to recreation and fish and 
wildlife enhancement; (3) bear all costs of operation, 
maintenance, and replacement of recreation and fish 
and wildlife lands and facilities including water 
replacement; (4) provide the water required for initial 
filling and replenishment of evaporation losses of the 
recreation pool by purchase or other means consistent 
with Federal and State laws, to assure effective 
operation of the project for recreation and fish and 
wildlife enhancement; b. hold and save the United 
States free from damages due to water-rights claims 
resulting from construction and operation of the 
project; c. prevent encroachment on the flow-carrying 
capacity of the channel below the reservoir to the 
extent necessary to provide for effective reservoir 
operation in the interest of flood control; d. adequately 
inform affected interests, at least annually, that the 
project will not provide complete flood protection; and 
e. provide guidance and leadership in preventing 
unwise and uneconomical future development of the 
flood plain areas by encouraging prudent management 
techniques to reduce future flood losses. 
Operations and results during fiscal year. Initiated 
contract surveys and design studies by hired labor. 
Condition at end offiscalyear. Advance Engineering and 
Design studies in progress. 
6. BIG SIOUX RIVER AT SIOUX CITY, 
IOWA AND S. DAK. 
Location. Near mouth of Big Sioux River in the 
vicinity of Sioux City, Woodbury County, Iowa and 
North Sioux City, Union County, South Dakota. 
Existing project. The project consists of excavating a 
new channel from the Missouri River to the Interstate 
Highway No. 29 Bridge to eliminate the sharp bend 
immediately downstream from the bridge. The reach 
of the existing channel downstream from the Interstate 
Highway Bridge would be abandoned. Project was 
authorized by the Flood Control Act of 1968, (Senate 
Document 94, 90th Congress). Estimated cost of the 
improvement $3,854,000 (July 1970), of which $3,640, 
000 is Federal cost and $214,000 is non-Federal cost. 
Local Cooperation. Section 3 of the Flood Control Act 
approved 22 June 1936 applies. At a regular meeting of 
the City Council of Sioux City on 21 November 1966, 
the Council passed a resolution expressing a willingness 
and an ability to furnish the required local cooperation. 
The Union County Commissioners, Union 
County, South Dakota, have endorsed the project and 
provided resolutions which indicate their cooperation 
and willingness to furnish the necessary local cooperation 
for the South Dakota portion of the 
improvement. 
Operation and results during fiscal year. None. 
Condition at end of fiscal year. Work has not started. 
7. BILLINGS, MONT. 
Location. At Billings and vicinity on Yellowstone 
River, Mont., 346 river miles upstream from its 
confluence with the Missouri River. 
Existing project. Plan consists of a system of ditches, 
channels, and levees by means of which flood-waters 
approaching the city from the west, east, or south may 
be diverted away from the area subject to flooding. 
Proposed plan is divided into three separate units, 
namely, the western, eastern, and southern units. 
Project authorized by 1950 Flood Control Act (H. Doc. 
216, 81st Cong., 1st sess.). Estimated Federal cost (July 
1960) is $4,590,000; estimated local cost (July 1960) is 
$353,000 for relocations, lands, and damages. Reexamination 
of feasibility of authorized plan is necessary 
because of the rapid expansion of the city of 
Billings, which took place since preparation of the 
project document in 1946, has extended the city 
beyond the protection limits proposed by the authorized 
project. Accordingly, this project has been 
reclassifed to "deferred" category. 
Local Cooperation. Section 3 of the Flood Control Act 
approved 22 June 1936 applies. City Council of 
Billings, furnished a resolution dated January 7, 1964, 
agreeing to provide right-of-way acquisition with 
complete acquisition to be financed jointly by the city 
of Billings and several irrigation companies. In 
addition to the formal resolution from city, the 
combined irrigation companies pledged $20,000 toward 
right-of-way and County Commissioners took 
action toward the local bridge problem. 
641

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operation and Results During the Fiscal Year. Continued 
preparation of the feasibility report to determine if an 
acceptable flood control project can be economically 
constructed. 
Condition at End of Fiscal Year. Restudy of project to 
determine economic feasibility is in progress and about 
99% complete. 
8. BLACKBIRD CREEK, NEAR MACY, 
NEBRASKA 
Location. On Blackbird Creek, a right bank tributary 
of the Missouri River, near the village of Macy in 
northeastern Nebraska. 
Existing project. Channel realignment along with 
construction of a berm and levee on each bank of 
Blackbird Creek for a distance of approximately 2.5 
miles. Project was authorized for construction by Chief 
of Engineers on November 9, 1965, under authority 
provided by Section 205, 1948 Flood Control Act, as 
amended. Estimated cost is $301,000 (July 1969) of 
which $264,000 is Federal and $37,000 non-Federal. 
Local Cooperation. Fully complied with. 
Operation and Results During Fiscal Year. Work on asbuilt 
drawings and Operation Manual completed. 
Conditions at End of Fiscal Year. Construction was 
started March 1967 and completed November 1967. 
Work on as-built drawings and Operation Manual 
complete. 
9. BOWMAN-HALEY LAKE, N. DAK. 
Location. Damsite is on North Fork of Grand River in 
southwestern North Dakota, about 6 miles above 
Haley, N. Dak. 
Existing project. A dam and reservoir with a storage 
capacity of about 26,700 acre-feet for sediment storage, 
fish and wildlife conservation, and recreation, and 
future water supply for communities of Bowman, 
Reeder, Scranton, and Gascoyne, N. Dak. Also 
provided will be 59,300 acre-feet of exclusive flood 
control storage. Project was authorized by 1962 Flood 
Control Act. 
Estimated cost is $4,059,000 (July 1970) of which $3, 
413,000 is ultimate Federal cost and $646,000 future 
non-Federal reimbursement for water supply. 
Local Cooperation. Local interests must prevent encroachment 
on capacity of North Fork channel below 
reservoir; obtain water rights for storage; pay the 
United States for costs allocated to water supply; and 
hold the United States free from damages. Assurances 
of local cooperation were approved June 19, 1964. 
With respect to water rights, requirements have been 
complied with. Negotiation of a contract for future 
water supply is deferred pending availability of final 
construction costs. 
Operation and Results During Fisa:l Year. Regular funds, 
new work: Construction of public use facilities was 
completed. Regular funds, maintenance: Operation 
and maintenance activities included sedimentation 
and reservoir regulation studies and intermittent 
inspections of the dam and structures. 
Condition at the End of Fiscal Year. Construction was 
initiated July 1964, and the project is complete. Final 
construction costs are pending settlement of claims. On 
June 30, 1970, reservoir pool was at elevation 2755.06 
feet mean sea level and a total volume of 20,232 acrefeet 
of water was impounded. 
10. CHATFIELD LAKE, COLO. 
Location. On South Platte River, just below the 
mouth of Plum Creek, about eight miles upstream from 
Denver, Colorado. 
Existing Project. Consists of rolled earth-fill dam with 
a maximum height of 148 feet and a reservoir with 
flood control capacity of 215,000 acre-feet and sediment 
capacity of 20,000 acre-feet, which will be used 
for recreation, and an enlarged channel from the dam 
downstream to Denver to accommodate reservoir flood 
releases. Project was authorized by 1950 Flood Control 
Act. 
Estimated cost is $86,324,000 (July 1970) of which 
$85,200,000 is Federal cost for construction and $1,124, 
000 local cost in connection with the downstream 
channel improvement. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936 applies to the downstream channel improvement. 
The Colorado Water Conservation Board 
provided assurances of local cooperation for the 
downstream improvement of December 13, 1967. 
Local interests must provide water for filling the 
sediment reserve pool for recreation use which the state 
agreed to on April 25, 1967. 
Operations and Results During Fiscal Year. Continued 
design by hired labor. Continued real estate acquisition. 
Relocation of Colorado State Highway No. 
75 was continued. Contract for earth-work Stage III 
was awarded. Relocation of power and telephone 
facilities was continued. Negotiations with the owners 
for relocation of railroads and other utilities were 
completed. 
Condition at End of Fiscal Year. Construction of the 
project was initiated in August 1967, and is now 31 
percent complete. Acquisition of land is 66 percent 
complete. Relocation of Colorado Highway No. 75 is 
essentially complete. Relocation of Mountain States 
Telephone facilities and Public Service Company 
facilities was 92 percent and 76 percent complete, 
respectively. Negotiations for relocation of Denver 
Water Board facilities were complete. Construction of 
earth-work stage III has not started. Planning underway 
for remaining relocations, spillway, outlet 
works, downstream channel, and public use facilities. 
11. CHERRY CREEK LAKE, COLO. 
Location. Damsite is on Cherry Creek in Arapahoe 
County, Colo., approximately 6 miles southeast of 
642

OMAHA, NEBR., DISTRICT 
Denver, Colo. just outside of city limits. Cherry Creek 
joins South Platte River within city limits of Denver. 
Existing project. A rolled-earthfill dam with maximum 
height of 140 feet above streambed and 14,300 feet 
long. Project includes a reinforced concrete outlet 
works and an uncontrolled side channel spillway canal 
discharging into adjacent Toll Gate Creek, thus bypassing 
city of Denver. Cherry Creek project provides 
reservoir storage capacity of 95,000 acre-feet below 
spillway canal invert and surcharge storage of 136,400 
acre-feet above this elevation. Initial plan for operation 
is for flood control only. Plan of operation in ultimate 
development for multiple-purpose uses includes 10,000 
acre-feet for sediment storage, 85,000 acre-feet for 
conservation purposes, and surcharge for flood control 
purposes. Estimated cost of initial project is $15,269, 
415 (July 1970) including $600,000 Code 710 funds 
(recreational facilities on completed projects). (See 
table 21-C for authorizing legislation.) 
Local cooperation. None required. 
Operations and results during fiscal year. No construction. 
Operation and maintenance activities include administration 
of project area, continuation of sediment 
studies and stream gaging activities, and continuation 
of miscellaneous items of ordinary repair and maintenance. 
Condition at end of fiscal year. Construction began in 
fiscal year 1946 and was completed in June 1961 
exclusive of recreation facilities. 
12. DAVIDS CREEK LAKE, IOWA 
Location. On Davids Creek in Audubon County, Iowa 
about 0.5 mile above the town of Exira. Davids Creek, 
a left bank tributary of the East Nishnabotna River, 
rises in Audubon County, 15 miles northeast of Exira, 
Iowa, and flows southwesterly and enters the East 
Nishnabotna River at Exira, Iowa. 
Existing project. A rolled earthfill dam with a 
maximum height above the valley floor of 62 feet and a 
crest length of 1,800 feet. Project includes an emergency 
grassed spillway located near the right 
abutment to prevent overtopping of the dam. The 
reservoir provides for 29,600 acre-feet of storage 
exclusive of 30,400 acre-feet of surcharge storage. Of 
this amount 21,900 acre-feet is for flood control and 7, 
700 acre-feet for multiple purpose storage. The 
multiple purpose pool provides 600 acres of water 
surface for fish, wildlife and recreation needs. Reservoir 
operated by means of an uncontrolled outlet with a 
gated low-level outlet provided for maintenance and 
operational releases from the multiple purpose pool. 
Project was authorized by Flood Control Act of 1968. 
The estimated cost is $2,880,000 (July 1970) of 
which $2,620,000 is ultimate Federal cost and $260,000 
non-Federal reimbursement for recreation cost sharing. 
Local cooperation. Local interests will be required to 
contribute to the first cost of the project in accordance 
with provisions of the Federal Water Project Recreation 
Act, for recreation development; operate, 
maintain and replace as becomes necessary the basic 
recreation facilities and improvements in the wildlife 
management area; hold and save the United States 
free from damages due to construction of the project; 
and obtain and resolve any conflicts in water rights 
needed for storage and use of water. By resolution, 
dated 5 January 1966, the State Conservation Commission 
of Iowa gave assurance that it would provide 
this required local cooperation. 
Operation and results during fiscal year. None. 
Condition at the end of fiscal year. Work has not started. 
13. FALL RIVER BASIN, S. DAK. 
Location. In Custer and Fall River Counties, S. Dak., 
in and near town of Hot Springs. Hot Springs unit is in 
town of Hot Springs, immediately south of junction of 
Cold Brook and Hot Brook which combine to form Fall 
River; Cold Brook Lake unit is approximately 1-1/4 
miles north of town of Hot Springs on Cold Brook; and 
Cottonwood Springs Lake unit is approximately 4-1/2 
miles west of town of Hot Springs on Cottonwood 
Springs Creek, one-half mile upstream from its 
confluence with Hot Brook. 
Existing project. Project as authorized by 1941 Flood 
Control Act, is a plan of flood protection on Fall River 
and tributaries, S. Dak., substantially in accordance 
with recommendations of Chief of Engineers in House 
Document 655, 76th Congress, 3d session. General plan 
of improvement provides for protection from flood 
damage of people and property of town of Hot Springs, 
S. Dak. Hot Springs channel improvement unit 
provides for widening, deepening, and straightening 
channel of Fall River from a point near confluence of 
Hot Brook and Cold Brook to a point 400 feet below 
Eighth Street Bridge or a total distance of approximately 
6,000 feet. Clearing trees, boulders, 
concrete slabs, and all obstructions to flow is provided 
for. Cold Brook Lake unit is designed to control an area 
of 70.5 square miles, and has a capacity of 6,000 acrefeet 
at spillway crest, with surcharge at maximum pool 
of 5,114 acre-feet. Following features are included: 
Construction of an earthfill dam with uncontrolled 
outlet; uncontrolled reinforced concrete conduit under 
dam; and a spillway with a discharge capacity of 85, 
000 cubic feet per second at maximum pool elevation 
through solid rock adjacent to reservoir. Cottonwood 
Springs Lake unit controls an area of 26 square miles 
and has a capacity of 8,340 acre-feet at spillway crest 
with a surcharge at maximum pool of 3,295 acre-feet. 
Following features are included: Construction of 
earthfill dam with an uncontrolled outlet consisting of 
a reinforced uncontrolled concrete drop intake, with a 
reinforced concrete conduit extending through the base 
of the dam; and an uncontrolled spillway in right 
abutment. 
Estimated cost is $5,181,000 (July 1970), of which 
$5,038,000 is Federal cost for construction and $143, 
000 is local cost for lands and relocations. 
643

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Local cooperation. Local cooperation was required only 
for the Hot Springs Channel Improvement. These 
requirements have been fully complied with. 
Operations and results during fiscal year. Plans and 
specifications for Stage I Recreation Facilities completed 
and advertisement scheduled for September 
1970. Construction of the dam by contract was 
essentially completed. Operation and Maintenance 
activities included continuation of sedimentation 
studies, reservoir regulation studies, and intermittent 
inspections of the Cold Brook Dam and structures. 
Condition at end of fiscal year. Construction of Hot 
Springs unit was completed during fiscal year 1951. 
Construction of Cold Brook unit dam and appurtenances 
was complete in fiscal year 1953 with 
exception of a road and parking area which were 
completed by contract in fiscal year 1955. Construction 
of the Cottonwood Springs Dam was essentially 
complete. Planning for recreation facilities for Cottonwood 
Springs was in progress. 
14. FLOYD RIVER, SIOUX CITY, IOWA 
Location. Along Floyd River in Sioux City, Woodbury 
County, Iowa. 
Existing project. Plan provided for straightening and 
enlarging existing channel above 18th Street with earth 
levees along each bank and construction of a relocated 
channel from 18th Street to mouth with levees and 
riprapped channel section. A project for flood protection 
on Floyd River, Iowa, was authorized by 1958 
Flood Control Act substantially as recommended by 
Chief of Engineers in House Document 417, 84th 
Congress, 2d session, as amended by 1962 Flood 
Control Act which provides for construction of Interstate 
Highway 29 twin bridges across new Floyd 
River channel at Federal expense. Estimated cost is 
$18,359,000 (July 1970), of which $11,559,000 is 
Federal cost for construction, and $5,800,000 
(including cash contribution required by law) is local 
costs for lands, damages, bridge construction, bridge 
alterations, relocations of roads, buildings, power and 
telephone lines, and pipelines. 
Local cooperation. Local interests required to furnish 
lands and rights-of-way for construction; hold the 
United States free from damages; make road, highway, 
highway bridge (other than those required to carry 
Interstate Highway 29 over relocated Floyd River) and 
utility alterations, and additions; contribute 84 percent 
of estimated first cost of work for which the United 
States would be responsible; and maintain and operate 
all works after completion. Fully complied with. 
Operations and results during fiscal year. Preparation of 
operation manual and as-built drawings continued. 
Condition at end of fiscal year. Construction of project 
began in July 1961 and was completed in September 
1966. Preparation of operation manual and as-built 
drawings essentially complete. 
15. GERING VALLEY, NEBR. 
Location. In western extremity of Nebraska panhandle 
near Scottsbluff, Nebr. 
Existing project. Authorized by Flood Control Act of 
1958 and modified by Flood Control Act of 1960. Plan 
includes: (a) Land treatment and conservation measures 
as determined necessary by the Soil Conservation 
Service; (b) a system of eight reservoirs, to achieve 
downstream flow reduction; (c) channel improvements 
on two tributaries of the main drain, 320 on-farmstabilization 
structures, and four large channel stabilization 
structures on tributaries to be constructed by 
Soil Conservation Service; (d) 24 drop structures, 17 
rock sills with parallel fencing, and 4,800 linear feet of 
rock lining to be constructed on Main Gering drain 
and its tributaries; (e) approximately 125,000 linear 
feet of continuous earth barriers along Main Gering 
drain and its tributaries, (f) 37,900 linear feet of trickle 
channel, where needed, landward of earth to convey 
interior drainage and waste irrigation water to selected 
inlet points; (g) a system consisting of 59 inlet 
structures for conveying runoff from interior areas to 
main drain and its tributaries; (h) 7 culvert type drop 
structures in the upper drain below Roubadeau Dam; 
(i) 13,000 lineal feet of channel improvements; and (j) 
28,000 lineal feet of channel fencing to reduce channel 
meandering below drop structure No. 1 in Main 
Gering drain all to be constructed by Corps of 
Engineers. 
Estimated Federal cost (July 1969) is $5,815,000 for 
Corps of Engineers portion and $3,591,000 for Soil 
Conservation Service. Estimated local cost is $273,000 
for Corps of Engineers portion of construction work, 
$315,800 for Soil Conservation construction work, and 
$1,015,400 for Soil Conservation land treatment 
measures. 
Local cooperation. Fully complied with. 
Operation and results during fiscal year. Project completed. 
Condition at end of fiscal year. Construction was started 
in February 1963 and completed April 1969. Operations 
and maintenance manual is under preparation. 
16. GREAT FALLS, MONT. 
Location. In Great Falls, Cascade County, Montana 
at confluence of the Sun and Missouri Rivers. 
Existing project. Provides for levees along both banks of 
the Sun River, along the left bank of the Missouri 
River, and along the right bank of the Missouri River 
at the water works; and an interceptor ditch and closed 
conduit to collect and convey side-hill runoff to the Sun 
River. Project was authorized by 1958 Flood Control 
Act and amended by the 1965 Flood Control Act to 
waive the requirement that local interests contribute in 
cash a percentage of the construction costs of all items 
of work provided by the United States. 
644

OMAHA, NEBR., DISTRICT 
Estimated cost is $7,860,000 (July 1970) of which $5, 
970,000 is Federal cost of construction and $1,890,000 
local cost for lands, relocations and a cash contribution 
for replacement of a storm sewer conduit desired by 
local interests. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936 applies. In addition local interests must zone 
the unleveed portion of the flood channel through the 
damage area to preserve its capacity and to prevent 
further encroachments and contribute in cash $103,000 
representing the estimated cost of replaced storm 
drainage facilities which will be incorporated into the 
closed conduit of the Watson Coulee interceptor. West 
Great Falls Flood Control and Drainage District 
provided assurances on 17 January 1968. Assessments 
required for financing the District are being adjudicated. 
Operations and results during fiscal year. Continued 
design by hired labor. 
Condition at end of fiscal year. Construction not started 
pending court decision on local assessments of non- 
Federal costs. Trial started on 13 February 1969, and is 
still in progress. 
17. IDA GROVE, IOWA 
Location. On left bank of Odebolt Creek just above its 
confluence with Maple River in northwestern Iowa. 
Existing project. Straighten and enlarge the Maple 
River and Odebolt Creek channels with training levees 
on the left banks of both streams to direct flows into the 
improved channels. Project was authorized by Chief of 
Engineers on January 6, 1967, under authority 
provided by section 205, 1948 Flood Control Act as 
amended. Estimated cost is $572,000 (July 1970) of 
which $553,000 is Federal and $19,000 non-Federal. 
Local cooperation. Provide all lands and rights-of-way 
required; assume liability of damages due to construction 
works; maintain and operate all works after 
completion in accordance with regulations prescribed; 
and assume full responsibility for all project costs in 
excess of $1,000,000. Fully complied with. 
Operation and results during fiscal year. Construction of 
levees and channel improvements completed. June 
flooding caused some damage to berms. Plans for 
repair initiated. 
Condition at end of fiscal year. Construction of project 
was initiated June 1965. Construction complete except 
for repair of damage to berms caused by June 1970 
flooding. 
18. LINTON, N. DAK. 
Location. At the confluence of Beaver and Spring 
Creeks in Emmons County in south central North 
Dakota. 
Existing project. Straighten and enlarge Spring and 
Beaver Creek channels, relocate a portion of the Spring 
Creek channel with levees on right bank of Beaver 
Creek and left bank of Spring Creek and lengthen 
Chicago, Milwaukee, St. Paul and Pacific Railroad 
bridge across Beaver Creek. Project was authorized by 
Chief of Engineers on September 5, 1967, under 
authority provided by Section 205, 1948 Flood Control 
Act as amended. The estimated cost is $416,000 (July 
1970) of which $401,000 is Federal and $15,000 non- 
Federal. 
Local cooperation. Section 3 of the Flood Control Act 
approved 22 June 1936 applies. In addition, local 
interests will assume responsibility for all costs in excess 
of the Federal limitation of $1,000,000. The North 
Dakota Water Commission furnished assurances of 
local cooperation by resolution dated 21 April 1969. 
Operation and results during fiscal year. Preparation of 
plans and specifications continued. 
Condition at end of fiscal year. Detailed Project Report 
approved, and preparation of plans and specifications 
was in progress, awaiting ROW to be furnished by 
local interests. 
19. LITTLE NEMAHA RIVER, NEBR. 
Location. Along the Little Nemaha River and its 
tributary streams from an existing Missouri River 
agricultural levee upstream about 20 miles to Brock, 
Nebraska. 
Existing project. Provides for construction of tieback 
levees and drainage structures along both banks of the 
Little Nemaha River to protect against a 50 year flood. 
Authorized by 1965 Flood Control Act. Estimated cost 
is $7,140,000 (July 1970), of which $5,800,000 is 
Federal cost for construction and $1,340,000 local cost 
for lands and relocations. 
Local cooperation. Section 3 of the Flood Control Act 
approved 22 June 1936 applies. In addition, local 
interests are required to at least annually inform 
interests affected that the levees will provide protection 
against flood flows only slightly greater than that 
experienced during the flood of July 1958 at Auburn. 
Little Nemaha Valley Levee District No. 3 indicated 
its intent to provide the necessary local cooperation. 
Operations and results during fiscal year. Design studies 
and surveys continued. 
Condition at end of year. Preconstruction planning in 
progress. General design memorandum approximately 
99 percent complete. 
20. LITTLE PAPILLION CREEK, NEBR. 
Location. In Douglas County along Little Papillion 
Creek from a point south of Irvington, Nebr., through 
metropolitan Omaha to its confluence with Papillion 
Creek. 
Existing project. Provides for channel improvements 
along Little Papillion Creek. Project was authorized by 
1962 Flood Control Act. Estimated cost is $5,700,000 
(July 1970), of which $3,820,000 is Federal cost for 
645

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
construction and $1,880,000 local cost for lands and 
relocations. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936 applies. All rights-of-way have been furnished. 
Operation and results during fiscal year. Construction was 
completed on channel improvements above 72nd 
Street. 
Condition at the end of fiscal year. Construction began 
October 1965 and is 89 percent complete. Channel 
improvements are complete with the exception of 
stability measures between Center St. and 1-80 bridge. 
21. LITTLE SIOUX RIVER AND 
TRIBUTARIES, IOWA 
Location. Along Little Sioux River and its tributaries 
in Monona, Harrison, and Woodbury Counties in 
northwest Iowa. 
Existing project. See Annual Report for 1962. Estimated 
cost is $18,483,000 (July 1970) of which $15, 
483,000 is Federal cost for construction and $3,000,000 
local costs for lands, damages, bridge construction, 
bridge alterations, and relocations of roads, buildings, 
power and telephone lines, and pipelines. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies, except highway bridges are raised at 
Federal expense. Fully complied with for all work. 
Operation and results during fiscal year. Regular funds: 
Completed operation and maintenance manuals. 
Condition at end offiscalyear. Construction began April 
1956 and is complete. The final unit was transferred to 
local interests on June 6, 1966. Project is complete. 
22. LOUP RIVER, COLUMBUS, NEBR. 
Location. Along the left bank of the Loup River just 
upstream from its confluence with the Platte River in 
the vicinity of the city of Columbus in Platte County, 
Nebraska. 
Existing project. Construction of levees along the left 
bank of Loup River with channel and levee riprap 
protection provided in the vicinity of highway and 
railroad crossings; and raising of portion of railroad 
track. Project was authorized by Chief of Engineers on 
1 December 1967, under authority provided by Section 
205, 1948 Flood Control Act as amended. The 
estimated cost is $1,969,000 (July 1970) of which $1, 
000,000 is Federal and $969,000 will be borne by local 
interests. 
Local cooperation. Section 3 of the Flood Control Act 
approved June 22, 1936 applies. In addition, local 
interests will assume full responsibility for all project 
costs in excess of the Federal limitation of $1,000,000; 
provide necessary areas for ponding interior drainage, 
and prescribe and enforce regulations to prevent 
encroachment. The Columbus City Council has 
furnished a resolution expressing the willingness and 
ability to furnish the required local cooperation. 
Operations and results during fiscal year. Preparation of 
plans and specifications was continued. 
Condition at end of fiscal year. Detailed Project Report 
approved. Preparation of plans and specifications in 
progress. 
23. MISSOURI RIVER BASIN (OMAHA 
DIST.) 
Location. Flood control improvements in this project 
are along Missouri River and several of its principal 
tributaries and in States comprising Missouri River 
Basin. 
Existing project. General comprehensive plan for flood 
control and other purposes in Missouri River Basin 
provides for levees along Missouri River between Sioux 
City, Iowa, and mouth and reservoirs on main stem of 
Missouri River and tributaries for control of floodflows 
at damsites. (See table 21-C for authorizing legislation; 
also see table 21-F on projects in Omaha District 
included in comprehensive plan.) 
Operations and results during fiscal year. See individual 
reports. 
Condition at end of fiscal year. See individual reports. 
24. MISSOURI RIVER, GARRISON DAM 
TO LAKE OAHE, N. DAK. 
Location. Along the channel of Missouri River 
between Garrison Dam and headwaters of Oahe 
Reservoir in North Dakota. 
Existing project. Consists of bank stabilization and 
rectification works required to stabilize banks of 
Missouri River in specific areas and prevent further 
loss of agricultural lands through erosion. Estimated 
total cost (July 1970) is $7,970,000 of which $7,810,000 
is Federal and $160,000 non-Federal. Project was 
authorized by Flood Control Act of 1963 and 1968. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Sponsorship of project is being 
provided by North Dakota State Water Commission. 
Operations and results during fiscal year. Completed the 
Stanton Area and the emergency work in the Bismarck-
Mandan area. Initiated and completed work at 
Bismarck river front. 
Condition at end of fiscal year. Construction was initiated 
January 1965 and project is 48 percent complete. 
25. MISSOURI RIVER, KENSLERS BEND, 
NEBR., TO SIOUX CITY, IOWA 
Location. Project is along Missouri River between 
Ponca Bend, Nebr., and combination bridge at Sioux 
City, Iowa. 
Existing project. Authorized by 1941 Flood Control 
Act and modified by 1948 Flood Control Act provides 
for construction of dikes, revetments and channel 
improvement along Missouri River from Miners Bend 
646

OMAHA, NEBR., DISTRICT 
and vicinity, S. Dak. and Nebr., to Sioux City, Iowa. 
Federal cost of new work under project is $11,294,414. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Repair and/or replacement of 2,898 linear feet of dikes 
and 3,157 linear feet of revetment by contract. Hired 
labor work included minor amounts of snag and debris 
removal causing damage to dikes and revetments. 
Condition at end of fiscal year. Project was started in 
June 1946 and completed in June 1961. 
26. MISSOURI RIVER LEVEE SYSTEM, 
IOWA, NEBRASKA, KANSAS AND 
MISSOURI (SIOUX CITY, IOWA TO 
RULO, NEBR.) 
Location. On both banks of the Missouri River from 
Sioux City, Iowa to St. Louis, Missouri, a distance of 
approximately 760 miles. Portion of the project in 
Omaha District extends from Sioux City, Iowa to Rulo, 
Nebraska. 
Existing project. A series of levee units and appurtenant 
works along both sides of Missouri River 
from Sioux City, Iowa, to mouth, for protection of 
agricultural lands and small communities against 
floods. Cost estimate for active portion of project from 
Sioux City, Iowa to Rulo, Nebr. (July 1970) is $23,380, 
000 of which $21,180,000 is Federal cost for construction 
and $2,200,000 local costs for lands and 
damages. (See table 21-C for authorizing legislation.) 
Remaining portion of the project consists of units on 
which planning and construction have been deferred 
pending completion of restudy to assure that additional 
levee construction is economically justified. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936 applies. Fully complied with for all completed 
units and units under construction. 
Operations and results during fiscal year. Construction of 
Stage I and Stage II of Unit R-613 completed. 
Construction of Stage III Levees and railroad bridge 
initiated. General engineering studies pertaining to all 
units were continued. 
Condition at end of fiscal year. Construction of project 
was initiated June 1948. Report on restudy of deferred 
units is under review by higher authority. Levee Units 
L-627, 624; L-594; R-580; L-575; R-573; R-562; L- 
561, 550; R-548; L-536; R-520 and L-601, which 
provided 178 miles of levee, are complete. Construction 
of Stage I and Stage II of Unit R-613 Levees complete. 
Construction of Stage III Levees about 48 percent 
complete. 
27. MUD CREEK, BROKEN BOW, NEBR. 
Location. On the South and North Branches of Mud 
Creek just above their confluence near the western city 
limits of Broken Bow, Nebraska and continuing on 
Mud Creek through the city of Broken Bow. 
Existing Project. Diversion of the South Branch of 
Mud Creek into the North Branch upstream of Broken 
Bow and channel improvement of Mud Creek through 
the city. Levees are proposed at the upstream end of the 
project to train flood flows into the channel with a drop 
structure to prevent channel degradation. Project was 
authorized by the Chief of Engineers on 30 December 
1968, under authority provided by Section 205 of the 
1948 Flood Control Act, as amended. The estimated 
cost is $1,452,000 (May 1968) of which $1,000,000 is 
Federal and $452,000 will be borne by local interests. 
Local cooperation. Section 3 of the Flood Control Act 
approved June 22, 1936 applies. In addition, local 
interests will assume full responsibility for all project 
costs in excess of the Federal limitation of $1,000,000; 
perform without cost to the United States, in conjunction 
with furnishing rights-of-way, all necessary 
removal or alteration of existing buildings and other 
improvements, and all necessary alterations to bridges 
(except railroad), roads, streets, sewers and other 
utilities. The Broken Bow City Council has furnished a 
resolution expressing the willingness and ability to 
furnish the required local cooperation. 
Operations and results during fiscal year. Preparation of 
plans and specifications was initiated. 
Condition at end of fiscal year. Preparation of plans and 
specifications in progress. 
28. NORFOLK, NEBR. 
Location. In Madison County in northeast Nebraska 
at confluence of Elkhorn River and North Branch of 
Elkhorn River, approximately 110 miles northwest of 
Omaha, Nebr. 
Existing project. Consists of a new channel from the 
north city limits around the east side of the city proper 
and then back into the existing channel downstream of 
the south city limits. It provides a diversion control 
structure and culverts for diversion of normal stream 
discharges into the old channel permitting continued 
operation of an existing Mill Dam. The diversion 
structure and stilling basin were constructed in 
conjunction with a new C&NW Railway bridge. 
Levees were provided on both banks of the new 
channel. Total cost was $4,364,000 of which $3,404,000 
was Federal and $960,000 was non-Federal. The 
project was authorized by the Flood Control Act of 
1950. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Project completed. 
Condition at end offiscalyear. Construction was initiated 
May 1966 and was completed December 1968. 
Operation and maintenance manual is under preparation. 
647

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
29. PAPILLION CREEK AND 
TRIBUTARIES, NEBR. 
Location. The Papillion Creek basin is located in 
Washington, Douglas, and Sarpy Counties, Nebraska. 
Big Papillion Creek rises west of Blair, flows southeasterly 
through metropolitan Omaha area where it is 
joined by the Little Papillion Creek just above Offutt 
AFB, forming Papillion Creek. The combined creek 
flows along the side of Offutt AFB to its confluence with 
the Missouri River. 
Existing project. The project consists of a series of 21 
dams and reservoirs on tributaries of Papillion Creek. 
Project for flood control, recreation, and water quality 
control was authorized by the 1968 Flood Control Act, 
(House Document 349, 90th Congress). Estimated cost 
of the improvements is $38,000,000 (July 1970) of 
which $35,355,000 is ultimate Federal cost and $2,645, 
000 is future non-Federal reimbursement for recreation 
facilities cost sharing. 
Local cooperation. Local interests will be required to: 
(a) maintain the Papillion Creek channels downstream 
from the damsites free of obstructions and available to 
accommodate reservoir releases and uncontrolled flow; 
(b) insure that all new bridge construction, and future 
modification of existing bridges, downstream from 
reservoirs of the proposed system, shall have hydraulic 
capacity acceptable to the Chief of Engineers; (c) 
provide guidance and leadership in preventing unwise 
and uneconomical future development of the flood 
plain areas by encouraging prudent use of flood 
proofing, land regulation planning, or other flood plain 
management techniques to reduce flood losses; (d) hold 
and save the United States free from all damages 
arising from water-rights claims resulting from the 
construction and operation of the reservoirs; (e) 
exercise, to the full extent of their legal capability, 
control against removal of streamflow made available 
for water quality control; and (f) in accordance with 
the Federal Water Project Recreation Act: (1) administer 
project land and water areas for recreation 
and fish and wildlife enhancement; (2) pay, contribute 
in kind, or repay (which may be through user fees) with 
interest, one-half of the separable first cost of the 
project allocated to recreation and fish and wildlife 
enhancement; and (3) bear all costs of operation, 
maintenance, and replacement of lands and facilities 
for recreation and fish and wildlife enhancement. 
Operations and results during fiscal year. Preconstruction 
planning initiated. 
Condition at end of fiscal year. Design studies are in 
progress. Site report for Dam No. 16 is essentially 
complete. 
30. PIPESTEM LAKE, N. DAK. 
Location. On Pipestem Creek in Stutsman County, 
North Dakota 3 miles upstream from where Pipestem 
Creek joins the James River at Jamestown, North 
Dakota. 
Existing project. Authorized by 1965 Flood Control 
Act. Consists of a rolled earthfill dam approximately 
102 feet high with a crest length of 4000 feet. The outlet 
works consists of a gated reinforced concrete conduit. 
The reservoir will provide 149,500 acre-feet of storage. 
The multi-purpose pool will provide space for silt 
storage and 830 acres of water surface for fish, wildlife 
and recreation needs. 
Estimated cost is $7,200,000 (July 1970) of which $7, 
050,000 is ultimate Federal cost, $150,000 future non- 
Federal reimbursement for recreation facilities cost 
sharing. 
Local cooperation. Local interests are required to 
administer project land and water areas for recreation 
and fish and wildlife enhancement and to bear the first 
cost of associated improvements in the wildlife management 
area; pay, contribute in kind, or repay, with 
interest, one-half of the separable cost of the project 
allocated to recreation and fish and wildlife enhancement; 
and bear all costs of operation, maintenance, 
and replacement of recreation and fish and 
wildlife lands and facilities. 
Operations and results during fiscal year. Preconstruction 
planning continued. 
Condition at end of fiscal year. Design studies in progress. 
Real estate appraisals underway. 
31. SALT CREEK AND TRIBUTARIES, 
NEBR. 
Location. Salt Creek Basin comprises an area of about 
1,627 square miles in and around Lincoln in southeastern 
Nebraska. 
Existing project. The authorized project consists of a 
system of 10 dams and reservoirs, channel clearing, 
enlarging and realignment, levees and necessary bridge 
alterations. Project for flood protection was authorized 
by 1958 Flood Control Act, as recommended by Chief 
of Engineers in House Document 396, 84th Congress, 
2d session. Estimated cost of improvements for the 
active program is $11,871,000 (July 1970), of which 
$11,700,000 is Federal cost and $171,000 non-Federal 
cost. 
Pursuant to Senate Resolution adopted August 7, 
1964, which authorized a review of Salt Creek survey 
report, proposed improvements in the Wahoo Creek 
Basin, including two of the authorized dams along Salt 
Creek downstream from Lincoln, above Lincoln, and 
ultimate plan through Lincoln were placed in 
"deferred" classification pending completion of the 
review. 
Local cooperation. Fully complied with for the completed 
levee and channel improvement part of the 
project. For the dams, local interests are required to 
operate and maintain the permanent pools for fish and 
wildlife conservation and assume all costs related to 
648

OMAHA, NEBR., DISTRICT 
utilization of the permanent pools for recreational 
purposes and insure public access to the pools. 
Operations and results during fiscal year. Regular funds, 
new work: Continued settlement of land condemnation 
actions. Regular funds, maintenance: Operation and 
maintenance activities included sedimentation and 
reservoir regulation studies and intermittent inspections 
of the dams and structures. 
Condition at the end of fiscal year. Construction of the 
project began in the spring of 1962. All work under the 
active portion of the project, consisting of the 10 dams 
and reservoirs and the channel improvements and 
levees through Lincoln, is complete. Settlement of land 
condemnation actions and preparation of operation 
and maintenance manuals remains to be accomplished. 
On June 30, 1969, a total volume of 37,900 
acre-feet of water was impounded behind the 10 dams. 
32. SCHUYLER, NEBR. 
Location. On the left bank of the Platte River about 
3.5 miles southwest of Schuyler, Nebraska where Lost 
Creek approaches within a few hundred feet of the 
Platte River. 
Existing project. Construction of a stonefill dike and 
revetment along left bank of Platte River and two levee 
segments between the Platte River and Lost Creek. 
Project was authorized by Chief of Engineers on April 
5, 1968, under authority provided by Section 205, 1948 
Flood Control Act as amended. Total cost was $294, 
000 (December 1967) of which $273,000 was Federal 
and $21,000 was non-Federal. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Planning was 
completed and construction was initiated 11 May 
1970. 
Condition at end of fiscal year. Project is 36 percent 
complete. 
33. SHERIDAN, YELLOWSTONE RIVER, 
WYO. 
Location. At Sheridan and vicinity on both sides of 
Goose and Little Goose Creeks approximately 11.6 
miles above junction of Goose Creek with Tongue 
River. 
Existing project. Overall plan of improvement for flood 
protection at Sheridan consists of a system of levees and 
floodwalls in combination with alterations of channels 
of Goose and Little Goose Creeks. Area subject to 
flooding will be protected by approximately 37,700 feet 
of levee, 4,810 feet of floodwall, and 30,140 feet of 
channel improvements including a concrete chute. 
Project was authorized by Flood Control Act of May 
17, 1950 (H. Doe. 216, 81st Cong., 1st sess.). Estimated 
Federal cost (July 1968) is $2,200,000. Estimated local 
cost (July 1968) is $280,000 for relocations, lands and 
damages. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Fully complied with for all work 
completed or under contract. Local interests financially 
unable to fulfill requirements for Stage III on 
Goose Creek above the mill cutoff. 
Operations and results during fiscal year. Work deferred 
pending receipt of local cooperation for balance of 
work. 
Condition at end of fiscal year. Project is 89 percent 
complete. Stage I, the mill cutoff and drop structures 
on Goose Creek and channels and levees below the mill 
cutoff and Stage II levees and channels on Little Goose 
Creek are complete and can, and have protected the 
areas in which they are located. Local interests 
requested that construction of Stage III on Goose 
Creek above the mill cu. off be delayed in order to 
arrange local financing. Stage III will be constructed 
when local interests are able to fulfill local requirements. 
34. VAUGHN, MONT. 
Location. On the right bank of Muddy Creek, 
approximately 1 mile above its confluence with the Sun 
River and approximately 15 miles west of Great Falls 
in west central Montana. 
Existing project. Levees along the left bank of Sun 
River and right bank of Muddy Creek with appurtenant 
drainage structures and minor channel 
improvements on Muddy Creek. Project was authorized 
for construction by Chief of Engineers on May 
12, 1966, under authority provided by Section 205, 
1948 Flood Control Act as amended. Estimated cost is 
$473,500 (July 1969) of which $457,500 is Federal and 
$16,000 non-Federal. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Fully complied with. 
Operations and results during fiscal year. Preparation of 
operation and maintenance manual continued. 
Condition at end of fiscal year. Construction initiated 
July 1968 and completed April 1969. Operation and 
maintenance manual being prepared. 
35. WATERLOO, NEBR. 
Location. On Elkhorn River in Douglas County, 
Nebr., approximately 23 miles west of Omaha, Nebr. 
Existing project. Plan includes a system of levees that 
begin at high ground northwest of Waterloo, encircle 
town on the north and east, and tie into embankment 
of U.S. Highway 275 southeast of town. Project was 
authorized by Flood Control Act 1950. Estimated cost 
(July 1970) is $278,000 of which $238,000 is Federal 
cost of construction and $40,000 local cost. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Fully complied with. 
Operations and result during fiscal year. Work completed 
on O&M Manual and "as-built" drawings. 
649

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end of fiscal year. Construction initiated 
July 1966 and completed April 1967. Remedial work 
contract awarded 20 June 1968 and completed in 
September 1968. Work on as-built drawings and 
Operation Manual complete. 
36. INSPECTION OF COMPLETED FLOOD 
CONTROL WORKS 
Flood Control Act of June 22, 1936, and subsequent 
acts require local interests furnish assurances that they 
will maintain and operate certain local protection 
projects after completion in accordance with regulations 
prescribed by Secretary of the Army. District 
Engineers are responsible for administration of these 
regulations within boundaries of their respective 
districts. 
Inspections of completed local protection projects 
which have been turned over to local interests for 
maintenance and operation during the fiscal year are 
set forth in table 21-G on inspections of completed local 
protection projects. 
37. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Under sections 7 and 9, Flood Control Act of 
December 22, 1944, Corps of Engineers is responsible 
for detailed scheduling of operations of storage capacity 
reserved for or assigned to flood control in 
reservoirs constructed by Bureau of Reclamation as 
well as those constructed by Corps of Engineers. 
Fiscal year costs were $123,551 and total costs to 
June 30, 1970 were $1,818,943. 
38. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 21-H. 
39. FLOOD CONTROL ACTIVITIES 
UNDER SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 205, Public Law 
858, 80th Congress, as Amended (Preauthorization) 
See table 21-I 
Emergency Flood Control Activities Repair, Flood Fighting 
and Rescue Work (Public Law 99, 84th Cong., and antecedent 
Legislation). 
Federal cost for fiscal year was $1,147,371, of which 
$72,868 was for advance preparation, $54,917 for 
flood-emergency operations, and $1,019,586 for repair 
and restoration. 
40. SOUTH PLATTE RIVER BASIN, COLO. 
Location. Flood control improvements in this project 
are along the South Platte River and its tributaries in 
Colorado. 
Existing project. General plan for flood control and 
other purposes provides for construction of Chatfield 
Lake on the South Platte River, Bear Creek Lake on 
Bear Creek and levee and channel improvements on 
the South Platte River. (See table 21-C for authorizing 
legislation.) 
Operations and results during fiscal year. See individual 
reports. 
Condition at end of year. See individual reports. 
MULTIPLE-PURPOSE PROJECTS 
INCLUDING POWER 
41. BIG BEND DAM-LAKE SHARPE, 
MISSOURI RIVER, BASIN, S. DAK. 
Location. On Missouri River, 987.4 miles above 
mouth, near Fort Thompson, S. Dak., and approximately 
20 miles upstream from Chamberlain, S. 
Dak. Dam is in upstream reach of Fort Randall 
Reservoir and reservoir extends upstream to Pierre, S. 
Dak. 
Existing project. A rolled-earthfill dam 95 feet high, a 
hydroelectric generating plant consisting of eight 58, 
500 kilowatt units, and a chute-type gated spillway. 
Reservoir provides gross storage of 1,900,000 acre-feet. 
Project was authorized by 1944 Flood Control act as 
part of general comprehensive plan for flood control 
and other purposes in Missouri River Basin. Estimated 
cost (July 1970) is $105,950,000. 
Local cooperation. None required. 
Operations and results during fiscal year. Regular funds, 
new work: Land acquisition completed except for 
minor acquisitions and pending court actions on 
condemnation cases. Work by contract was completed 
on maintenance yard and facilities, and other minor 
construction and supply contracts. Work continued on 
recreation facilities and access roads, supervisory 
control equipment, and other minor contracts. Hired 
labor dredging was completed on Pierre waterfront. 
Regular funds, maintenance: Project was operated in 
conjunction with other Missouri River reservoirs for 
flood control, navigation, power production and other 
multiple uses. Reservoir releases totalled 21,092,000 
acre-feet, an average of 29,100 cubic feet per second, 1, 
224,215,000 gross kilowatt hours of electricity were 
produced. 
Condition at end offiscalyear. Construction was initiated 
September 1959 and is 96 percent complete. Land 
acquisition complete. Planning underway for remaining 
minor relocation items, recreation facilities, 
reservoir improvements, and miscellaneous contracts. 
Major construction contracts were in force for marine 
storage facilities and supervisory control equipment. 
On 30 June 1970 pool elevation was at 1420.3 and 1, 
727,000 acre-feet of water were impounded. 
650

OMAHA, NEBR., DISTRICT 
42. FORT RANDALL DAM-LAKE FRANCIS 
CASE, MISSOURI RIVER BASIN, 
S. DAK. 
Location. On Missouri River in Charles Mix and 
Gregory Counties, S. Dak., about 82 miles above 
Yankton, S. Dak. Site is 880 miles above mouth of 
Missouri River and 148 miles above Sioux City, Iowa. 
Existing project. A rolled-earthfill dam with a maximum 
height of 165 feet and a reservoir for flood 
control, irrigation, navigation, hydroelectric power, 
and other purposes, with a gross storage capacity of 5, 
700,000 acre-feet at maximum operating pool. The 
power installation consists of eight units nominally 
rated at 40,000 kilowatts each. 
Project authorized by Flood Control Act of 1944 as 
part of general comprehensive plan for flood control 
and other purposes in Missouri River Basin. Estimated 
cost of project is $198,754,600 (July 1970), of which 
$198,034,600 is Federal cost for construction including 
$632,500 Code 710 funds, and $720,000 local cost for 
approaches to Platte-Winner Bridge. 
Local cooperation. None required. 
Operations and results during fiscal year. Regular funds, 
new work: Design of additional recreation facilities was 
accomplished using Code 710 funds. Regular funds, 
maintenance: Project was operated in conjunction with 
other Missouri River reservoirs for flood control, 
navigation, power production, and other multiple uses. 
Total releases from the reservoir were 22,244,000 acrefeet; 
equivalent to an average flow of 30,700 cubic feet 
per second. Produced 1,935,311,000 gross kilowatthours 
of electricity. 
Condition at end of fiscal year. Construction began in 
May 1946 and is complete except for Code 710 work. 
Work remaining to complete are additional reservoir 
access and recreation facilities using Code 710 funds. 
On June 30, 1970, reservoir pool was at elevation 
1356.0 feet mean sea level and a total volume of 3,912, 
000 acre-feet of water was impounded. 
43. GARRISON DAM-LAKE SAKAKAWEA, 
MISSOURI RIVER BASIN, N. DAK. 
Location. On Missouri River in McLean and Mercer 
Counties, N. Dak., about 11 miles south of Garrison, N. 
Dak., and 9 miles west of Coleharbor, N. Dak. 1,389.9 
miles above mouth of river and 75 miles above 
Bismarck, N. Dak. 
Existing project. A rolled-earthfill dam 11,200 feet long 
with a maximum height of 202 feet and a reservoir for 
flood control, irrigation, navigation, hydroelectric 
power, and other purposes with a gross storage capacity 
of 24,500,000 acre-feet. It provides five power units 
rated at 80,000 kilowatts each, three flood control 
tunnels and a gated spillway. Existing project was 
authorized by 1944 Flood Control Act as part of 
general comprehensive plan for flood control and other 
purposes in Missouri River Basin, and by Public Works 
Appropriation Act, 1968. Estimated Federal cost (July 
1970) is $297,175,300 including $760,000 Code 710 
funds and $4,500,000 for major rehabilitation. Estimated 
non-Federal cost in connection with widening 
Snake Creek Embankment is $900,000. 
Local cooperation. None required except cost-sharing 
with State of North Dakota for widening of Snake 
Creek embankment. 
Operations and results during fiscal year. Regular funds, 
new work: Public use facilities were continued with 
Code 710 funds. Minor real estate acquisitions were 
made. Regular funds, maintenance: Garrison Reservoir 
was operated in conjunction with the other 
Missouri River reservoirs for flood control, navigation, 
power production, and other multiple purpose uses. 
Contracts were completed for powerhouse and intake 
structure roof repair, water supply main, and road and 
street repair. Reservoir releases were 19,034,000 acrefeet, 
or about 26,300 cubic feet per second. Generating 
facilities produced 2,885,035,000 gross kilowatt hours 
of electricity. Regular funds, rehabilitation: Contract 
work in connection with upgrading riprap on the 
reservoir side of the Snake Creek embankment was 
completed. Design studies and negotiations with State 
of North Dakota were completed for embankment 
widening and remaining slope protection. Contract for 
this work was initiated. 
Condition at the end of fiscal year. Construction of the 
project initiated April 1946 is complete except for 
additional recreational development utilizing Code 
710 funds and major rehabilitation work. Planning was 
in progress for recreational facilities, centralization of 
controls, and minor remaining items. Construction 
contract was in force for upgrading riprap protection 
and widening of the Snake Creek embankment. On 
June 30, 1970, pool elevation was 1846.6 and 21,394, 
000 acre-feet of water was impounded. 
44. GAVINS POINT DAM-LEWIS AND 
CLARK LAKE, MISSOURI RIVER 
BASIN, NEBR. AND S. DAK. 
Location. On Missouri River in Yankton County, S. 
Dak., and Knox County, Nebr., about 4 miles 
upstream from Yankton, S. Dak., and about 811.1 
miles above mouth of river. 
Existing project. A concrete and rolled-earthfill dam 
with a maximum height of 74 feet and a reservoir for 
flood control, irrigation, navigation, hydroelectric 
power, and other purposes with a gross storage capacity 
of 540,000 acre-feet at maximum operating pool. The 
power installation consists of three units nominally 
rated at 33,333 kilowatts each. Existing project was 
authorized by 1944 Flood Control Act as part of 
general comprehensive plan for flood control and other 
purposes in Missouri River Basin. Cost estimate July 
1970 is $49,614,250, including $1,557,700 Code 710 
funds (recreational facilities on completed projects). 
Local cooperation. None required. 
651

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. Regular funds, 
new work: Preparation of plans continued for recreation 
facilities. Development of recreation facilities 
continued using Code 710 funds. Regular funds, 
maintenance: Project was operated in conjunction with 
other Missouri River reservoirs for flood control, 
navigation, power production and other multiple 
purpose uses. Reservoir releases amounted to 23,857, 
000 acre-feet, or an average of 32,900 cubic feet per 
second. Three generating units were in commercial 
operation and produced 728,498,000 gross kilowatthours 
of electricity during fiscal year. Recreational 
areas were extensively used by the public. 
Condition at end of fiscal year. Construction was initiated 
in March 1952 and is complete except for additional 
recreation development which is being accomplished 
with Code 710 funds. Design studies are in progress for 
additional recreation development, centralization of 
controls and maintenance items. Project is providing its 
multiple-purpose benefits for flood control, navigation, 
power, and other uses. On June 30, 1970, pool 
elevation was 1206.6, and 432,000 acre-feet of water 
was impounded. 
45. OAHE DAM-LAKE OAHE, MISSOURI 
RIVER BASIN, S. DAK. AND N. DAK. 
Location. Dam is on Missouri River in Hughes and 
Stanley Counties, S. Dak., about 6 miles northwest of 
Pierre, S. Dak., and 1,072.3 miles above mouth of river. 
Existing project. A rolled-earthfill dam with maximum 
height of 245 feet and reservoir for flood control, 
irrigation, navigation, hydroelectric power, and other 
purposes with a gross storage capacity of 23,600,000 
acre-feet at maximum operating pool. It contains seven 
power units nominally rated at 85,000 kilowatts each. 
Existing project was authorized by 1944 Flood Control 
Act as part of general comprehensive plan for flood 
control and other purposes in Missouri River Basin. 
Estimated cost (July 1970) is $354,900,000. 
Local cooperation. None required. 
Operations and results during fiscal year. Regular funds, 
new work: Acquisition of reservoir lands continued. 
Preparation of plans and specifications continued. 
Contracts were completed for protection of Mobridge 
water intake and Emmons County roads. Completed 
contracts for miscellaneous minor items. Continued 
procurement of permanent operating equipment. 
Regular funds, maintenance: Oahe Reservoir project 
was operated in conjunction with the other Missouri 
River reservoirs for flood control, navigation, power 
production and other multiple-purpose uses. Total 
water releases from reservoir in FY 1970 were 21,259, 
000 acre-feet or an average discharge of 29,300 cubic 
feet per second. Generating facilities produced 3,391, 
923,000 gross kilowatt-hours of electricity. 
Condition at the end of fiscal year. Construction was 
initiated August 1948 and is 96 percent complete. Land 
acquisition is 96 percent complete. All power units on 
line and producing power. Design studies in progress 
and plans and specifications being prepared for 
remaining reservoir improvements, project roads, 
centralization of controls and recreation facilities. On 
June 30, 1970, pool elevation was 1612.8 and 21,020, 
000 acre-feet of water impounded. 
GENERAL INVESTIGATIONS 
46. SURVEYS 
Fiscal year cost was $648,591 of which $478,705 for 
flood control studies, $18,000 for special studies, and 
$151,886 for comprehensive basin studies. 
47. COLLECTION AND STUDY OF BASIC 
DATA 
(Flood Plain Information Reports) 
The following flood plain information reports were 
completed and presented to sponsors in F.Y. 1969, 
at a fiscal year cost of $28,700: 
Boulder Creek and South Boulder Creek, Volume II' 
Boulder County, Colorado, $3,739; 
Yellowstone River Volume I and Alkali Creek, 
Volume II' Billings, Montana, $6,778; 
Sage Creek, Volume II, Casper, Wyoming, $7,078; 
and
Crow Creek, Volume II, Cheyenne, Wyoming, $11, 
105.
Flood Plain Information reports were in preparation 
for Big Thompson River, Loveland, Colorado; Denver, 
Colorado, Volume V; Spring Creek, Fort Collins, 
Colorado; Big Muddy Creek, Spencer, Iowa; Wood 
River, Grand Island, Nebraska; Lodge Pole Creek, 
Sidney, Nebraska; Cottonwood, Sand and Wahoo 
Creeks, Wahoo, Nebraska; Bad River, Fort Pierre, 
South Dakota; and Crow Creek, Cheyenne, Wyoming. 
Fiscal year costs were $422; $22,110; $1,129; $7,975; 
$4,709; $6,893; $13,089; $3,499; and $11,105, respectively. 
Handling requests for flood hazard evaluations 
became a routine item of daily business. These 
evaluations produce immediate results since they guidy 
new construction out of flood hazard areas. 
A $58,166 expenditure in the Omaha District and 
$28,292 in the Missouri River Division during the fiscal 
year supported expanded Flood Plain Management 
Services. The flood hazard evaluations for numerous 
individual sites cost $25,467 in Fiscal Year 1970. 
(See table 21-J on completed flood plain information 
studies.) 
48. RESEARCH AND DEVELOPMENT 
Fiscal year costs were $109,882, of which $9,405 was 
for hydrologic studies and $100,477 for civil works 
investigations. 
652

OMAHA, NEBR., DISTRICT 
TABLE 21-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
1. Missouri River 
at Fort Peck, 
Mont. 
2. Missouri River, 
Sioux City, 
Iowa to Rulo, 
Nebr. 
3. Small Navigation 
Project, Sioux 
City, Iowa 
5. Bear Creek Lake, 
Colo. 
6. Big Sioux River 
at Sioux City, 
Iowa 
7. Billings, Mont. 
8. Blackbird Creek, 
near Macy, Nebr. 
9. Bowman-Haley 
Lake, N. Dak. 
10. Chatfield Lake, 
Colo. 
11. Cherry Creek 
Lake, Colo. 
12. Davids Creek 
Lake, Iowa 
13. Fall River 
Basin, S. Dak. 
14. Floyd River, 
Sioux City, 
Iowa (Federal 
Funds) 
(Contributed 
Funds) 
Funding 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
$ 65,000 
165,167 
1,590,223 
1,654,574 
1,765,0004 
955,084 
2,884,198 
4,494,501 
9,734 
150,000 
83,710 
70,0004 
5,388 
62,400 
102,099 
30,153 
20,249 
9,048,0004 
6,748,396 
5,000 
12 
70,691 
68,746 
100,000 4 
1,012,0004 
743,344 
19,016 
19,498 
2,978 
$ 17,000 $ 145,466 
15,995 19,180 
1,083,800 1,612,000 
883,654 1,626,990 
7,250,000 2,900,000 
6,819,840 3,392,828 
2,682,000 2,874,000 
2,519,286 2,454,819 
15,000 22,600 
2,012 1,135 
256,000 
91,948 
1,095,000 
1,580,277 
5,185,000 
1,141,375 
55,000 
53,986 
53,000 
54,313 
400,000 
39,108 
6,500 
6,504 
2,415 
2,965 
-567 
150,966 
110,000 
321,476 
7,700 
5,083 
6,800,134 
8,048,681 
80,500 
80,734 
53,400 
59,202 
1,000 
230,012 
8,000 
6,935 
-7,000 
2,561 
$ 105,000 
142,393 
1,536,000 
1,334,109 
1,500,000 
1,467,626 
4,906,000 
3,170,894 
26,761 
5,009 
-22,000 
5,691 
65,000 
83,899 
12,650 
15,239 
9,000,049 
10,086,521 
83,000 
83,330 
69,000 
68,225 
890,000 
1,030,596 
18,000 
18,047 
3,648 
$ 157,175,427 
157,162,874 
15,864,799 
15,448,856 
182,341,4911 
181,342,712 
59,280,1192 
58,516,8852 
46,100 
43,582 
150,000 
83,710 
70,000 
74,657 
73,787 
264,625 
262,478 
4,037,400 
4,009,486 
50,503 
40,570 
30,467,000 
26,456,447 
15,030,915 
15,025,412 
938,181 
930,063 
100,000 
5,096,460 
4,804,453 
111,016 
110,149 
11,559,000 
11,556,155 
90,000 
90,000 
653 
451-584 0-72-42

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 21A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
15. Gering Valley, New Work: 
Nebr. Approp. $ - $1,000,000 $526,000 $ - $ 5,815,000 
Cost 4,785 1,415,822 571,929 47,640 5,799,779 
16. Great Falls, New Work: 
Mont. Approp. 400,0004 417,000 220,000 345,000 1,507,000 
Cost 10,446 98,387 99,463 27,562 315,870 
17. Ida Grove, Iowa New Work: 
Approp. 20,000 27,100 404,000 -42,500 439,249 
Cost 150,268 4,639 28,298 220,579 430,401 
18. Linton, N. Dak. New Work: 
Approp. 355,0004 147 31,000 - 401,147 
Cost 16,336 2,158 6,675 610 39,185 
19. Little Nemaha New Work: 
River, Nebr. Approp. - 25,000 95,000 - 120,000 
Cost 16,133 21,417 43,004 38,938 119,492 
20. Little Papillion New Work: 
Creek, Nebr. Approp. 42,700 770,000 1,116,000 294,000 3,446,700 
Cost 314,624 607,277 473,701 960,047 3,404,525 
21. Little Sioux New Work: 
River and Approp. 250 - 7,000 5,791 15,482,919 
Tributaries, Cost 2,648 10,085 12,752 7,678 15,482,919 
Iowa 
22. Loup River, New Work: 
Columbus, Nebr. Approp. 300,0004 10,000 95,000 - 434,000 
Cost 12,354 25,655 19,524 26,984 96,251 
24. Missouri River, New Work: 
Garrison Dam Approp. 575,000 1,000,000 502,000 1,000,000 4,575,000 
to Lake Oahe, Cost 635,403 611,316 721,881 318,890 3,782,957 
N. Dak. 
25. Missouri River, New Work: 
Kenslers Bend, Approp. - - - - 11,294,414 
Nebr., to Sioux Cost - - - - 11,294,414 
City, Iowa Maint. 
Approp. 200,149 183,000 170,000 333,100 2,856,169 
Cost 233,877 183,018 171,657 296,245 2,852,315 
26. Missouri River New Work: 
Levees, Iowa, Approp. 700,0004 300,000 835,000 1,155,000 20,414,400 
Nebr., Kans. Cost 803,207 435,113 1,027,836 838,788 20,072,192 
27. Mud Creek, New Work: 
Broken Bow, Nebr. Approp. 60,000 - 8,500 20,000 112,500 
Cost 12,271 1,913 17,317 10,707 55,092 
28. Norfolk Local New Work: 
Protection, Approp. -230 825,000 979,000 350,000 3,404,062 
Elkhorn River Cost 8,221 1,199,425 1,485,341 404,114 3,392,447 
Basin, Nebr. 
29. Papillion Creek New Work: 
& Tribs., Nebr. Approp. 300,0004 - - - 300,000 
Cost 54,236 - - - 54,236 
30. Pipestem Lake, New Work: 
N. Dak. Approp. 400,000 130,000 100,000 400,000 1,030,000 
Cost 213,446 30,639 178,340 39,550 461,975 
31. Salt Creek and New Work: 
Tributaries, Approp. 80,300 1,750,000 863,000 78,900 11,802,200 
Nebr. Cost 74,892 1,547,534 1,529,107 136,824 11,791,660 
Maint. 
Approp. 65,720 32,500 29,500 42,050 227,270 
Cost 66,908 35,616 35,065 37,919 223,958 
32. Schuyler, Nebr. New Work: 
Approp. 225,0004 - 52,000 - 277,000 
Cost 60,249 - 28,311 10,352 98,912 
654

TABLE 21-A (Continued) 
OMAHA, NEBR., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
33. Sheridan, New Work: 
Yellowstone 
River, Wyo. 
34. Vaughn, Mont. 
35. Waterloo, Nebr. 
41. Big Bend Dam- 
Lake Sharpe, 
Missouri River 
Basin, S. Dak. 
42. Fort Randall 
Dam-Lake Francis 
Case, Missouri 
River Basin, 
S. Dak. 
43. Garrison Dam- 
Lake Sakakawea, 
Missouri River 
Basin, N. Dak. 
(Federal Funds) 
(Contributed Funds) 
44. Gavins Point 
Dam-Lewis & 
Clark Lake, 
Missouri River 
Basin, S. Dak. 
and Nebr. 
45. Oahe Dam-Lake 
Oahe, Missouri 
River Basin, 
S. Dak. & N. Dak. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
Major Rehab. 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
$ -
3,482 
-12,204 
1,055,000 4 
776,283 
932,229 
934,051 
-520 
2,407 
1,401,007 
1,440,066 
109,2904 
42,030 
2,043,260 
1,768,072 
1,100,000 
1,013,585 
245,000 
43,210 
69,755 
1,348,120 
1,177,676 
2,145,0004 
736,291 
1,511,955 
1,472,730 
$ 23,000 
32,679 
9,331 
179,390 
2,300,000 
3,013,518 
664,500 
657,100 
266,000 
1,228,634 
1,035,300 
1,046,482 
80,000 
237,943 
1,420,825 
1,343,492 
135,000 
152,749 
741,300 
1,008,513 
5,910,000 
6,554,552 
973,300 
969,295 
$ 40,000 
44,100 
355,000 
18,893 
-10,000 
-1,072 
1,460,000 
1,138,638 
756,000 
750,546 
72,000 
207,251 
1,186,500 
1,146,695 
180,000 
226,766 
1,364,500 
1,425,915 
900,000 
193,323 
173,900 
167,012 
903,500 
896,308 
1,200,000 
1,185,948 
1,148,000 
1,142,573 
3,534 
64,000 
406,514 
13,998 
900,000 
1,049,677 
830,000 
832,562 
34,160 
98,320 
1,361,000 
1,290,544 
27,500 
35,935 
1,506,000 
1,400,581 
1,000,000 
915,629 
39,500 
20,615 
874,000 
868,845 
1,350,000 
1,314,189 
1,402,000 
1,450,231 
$1,930,000 
1,927,644 
457,500 
454,179 
237,883 
237,883 
102,185,000 
101,458,603 
3,976,729 
3,960,654 
197,496,640 
197,495,951 
14,010,117 
13,891,022 
291,728,990 
291,639,734 
14,808,525 
14,356,418 
3,000,000 
2,122,537 
245,000 
49,009,260 
49,008,425 
9,237,250 
9,021,416 
338,658,000 
336,885,717 
8,708,025 
8,687,984 
1. Includes $18,325,581 National Industrial Recovery Act 
funds, $8,625,718 emergency relief funds, and $1,181,125 for 
previous project. 
2. Includes $235,122 for previous project and $200,000 
fiscal year 1968 supplemental appropriation funds. 
3. Includes $123,000 of government cost applicable to that 
portion of the project which is currently being carried in a 
deferred status. 
4. Includes budgetary reserves not included in allotments to 
the District. 
655

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
MISSOURI RIVER, SIOUX CITY, IOWA TO RULO, NEBRASKA 
TOTAL COST OF EXISTING PROJECT TO JUNE 30, 1970 
(See Section 2 of Text) 
Funding New Work Maaiinotsetnaannccee Total 
Regular Funds $153,210,288 $58,281,763 $211,492,051 
Public Works Funds 18,325,581 0 18,325,581 
Emergency Relief Funds 8,625,718 0 8,625,718 
Total Funds $180,161,587 $58,281,763 $238,443,350 
TABLE 21-C AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
MISSOURI RIVER, SIOUX CITY, IOWA TO RULO, NEBR. (See 
Section 2 of Text) 
Appropriation of $12 million authorized for existing project. 
Appropriation of $15 million additional allotments totalling 
$29,153,108 made by Public Works Administration under 
provisions of National Industrial Recovery Act of 1938, 
and $9,669,791 allotted under provisions of Emergency 
Relief Appropriations Act of 1935. 
For completion of project from mouth of Sioux City, Iowa. 
For a channel of 9-foot depth and 300-foot width 
CHERRY CREEK LAKE, COLO. (See Section 11 of Text) 
Initiation and partial accomplishment of project. 
Completion of plan approved in act of Aug. 18, 1941. 
General comprehensive plan, Missouri River Basin. 
MISSOURI RIVER BASIN (OMAHA DIST.) (See Section 23 
of Text) 
Adopted general comprehensive plan for Missouri River Basin 
and authorized $9 million for initiation and partial 
accomplishment. 
Modified general comprehensive plan to include Harlan 
County Dam and Reservoir on Republican River, Nebr., 
and authorized additional $7 million. 
Expanded general comprehensive plan for Missouri River 
Basin and authorized additional $200 million. 
Authorized additional $150 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
Authorized additional $250 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
Expanded general comprehensive plan for Missouri River 
Basin and authorized additional $217,710,000. 
Modified general comprehensive plan for Missouri River 
Basin by deletion of construction of Red Willow Dam and 
Reservoir, Nebr., and addition of construction of Wilson 
Dam and Reservoir, Kans. 
Expanded general comprehensive plan for Missouri River 
and authorized additional $200 million. 
Authorized additional $207 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
Authorized additional $80 million for prosecution of general 
comprehensive plan for Missouri River Basin and modified 
the plan to include work protection and rectification 
works below Garrison Dam. 
Authorized additional $116 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
Authorized additional $20 million for prosecution of general 
comprehensive plan for Missouri River Basin. 
Authorized additional $38 million for prosecution of general 
comprehensive plan for Missouri River Basin. 
Authorized additional $109 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
H. Doc. 1120, 60th Cong., 
2d Sess. 
H. Doc. 238, 73rd Cond., 2d 
Sess. 
H. Doc. 214, 76th Cong., 1st 
Sess. 
H. Doc. 426, 76th Cong., 1st 
Sess. 
H. Doc. 426, 76th Cong., Ist 
Sess. 
H. Doc. 475, and S. Docs. 191 
and 247, 78th Cong., 2d Sess. 
Flood Control Committee Doc. 1, 
75th Cong., 1st Sess. 
H. Doc. 842, 76th Cong., 3d 
Sess. 
H. Doc. 475, and S. Docs. 191 
and 247, 78th Cong., 2d Sess. 
H. Docs. 549 and 642, 81st 
Cong., 2d Sess. 
H. Doc. 409, 84th Cong., 2d 
Sess. 
656 
TABLE 21-B 
Jan. 12, 1927 
July 3, 1930 
Aug. 30, 1935 
Mar. 2, 1945 
Aug. 18, 1941 
Dec. 22, 1944 
Dec. 22, 1944 
June 28, 1938 
Aug. 18, 1941 
Dec. 22, 1944 
July 24, 1946 
May 17, 1950 
Sept. 3, 1954 
May 2, 1956 
July 3, 1958 
July 14, 1960 
Dec. 30, 1963 
June 18, 1965 
May 12, 1967 
Aug. 13, 1968 
June 19, 1970

TABLE 21-C (Continued) 
OMAHA, NEBR., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
MISSOURI RIVER LEVEE SYSTEM, IOWA, NEBR., KANS., 
AND MO. (See Section 26 of Text) 
Aug. 18, 1941 Levees along both sides of river from Sioux City to H. Doc. 821, 76th Cong., 3d 
Kansas City. Sess. 
Dec. 22, 1944 Extended project from Kansas City to mouth and provided for H. Doc. 475, 78th Cong., 2d 
increased protection. Sess. 
S. Docs. 191 and 247, 78th 
Cong., 2d Sess. 
SOUTH PLATTE RIVER BASIN, COLO. (See Section 40 of Text) 
May 17, 1950 Adopted plan of improvement for South Platte River Basin H. Doc. 669, 80th Cong., 2d 
and authorized $26,300,000 for initiation and partial Sess. 
accomplishment. 
May 12, 1967 Authorized additional $2,000,000 for prosecution of plan. 
Aug. 13, 1968 Authorized additional $12,000,000 for prosecution of plan 
and Bear Creek Lake. 
June 19, 1970 Authorized additional $21,000,000 for prosecution of plan. 
657

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 21-D OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report For Construction Maintenance 
Big Sioux River, S. Dak., and Iowa1 1952 
Missouri River, Sioux City, Iowa to 
Fort Benton, Mont.2 1948 3,123,141 644,863 
1. Deferred 
2. Complete 
MISSOURI RIVER, SIOUX CITY, IOWA TO RULO, NEBR.: 
TERMINAL FACILITIES 
TABLE 21-E (See Section 2 of Text) 
Miles 
Description of Facility Above Bank Nearest Town 
Mouth 
Marina Inn Motel 
Rock Barge Loading 
Sioux City Municipal Dock 
Kay Dee Feed Co. 
Big Soo Terminal Dock 
Borden Chemical Co., Smith Douglas Div. 
Alfalfa Dehydrating and Milling 
Gulf Oil Corp. 
Consolidated Storage, Inc. 
Agrico Chemical Co. 
Grain Loading 
Boat Ways 
Cement Unloading 
Cargo Carriers 
Omaha Municipal Dock 
Grain Loading 
Molasses Unloading 
Farmland Industries 
Grain Loading - Salt and Fertilizer Unloading 
Tallow Loading - Molasses and Salt Unloading 
Liquid Fertilizer Unloading 
Plattsmouth Municipal Dock 
Grain Loading 
Rock Dock 
Liquid Fertilizer Unloading 
Nebraska City Municipal Dock 
Grain Loading 
Grain Loading 
Steinhart Terminal Dock 
Grain Loading (Consolidated Blenders) 
Boat Ways 
Grain Loading 
Grain Loading 
Transfer of Sand and Gravel 
732.7 
731.7 
731.4 
731.2 
727.8 
716.6 
648.6 
648.5 
648.2 
647.7 
624.8 
624.5 
624.1 
624 
616.3 
616.3 
615.5 
614.5 
614.4 
612.2 
595.3 
591.6 
584.5 
574.4 
562.6 
562.4 
562.4 
562.4 
562.3 
561.8 
556.5 
535.5 
535.2 
498.6 
Right 
Left 
Left 
Left 
Left 
Left 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Left 
Left 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Right 
Sioux City, Nebr. 
Sioux City, Iowa 
Sioux City, Iowa 
Sioux City, Iowa 
Sioux City, Iowa 
Sioux City, Iowa 
Blair, Nebr. 
Blair, Nebr. 
Blair, Nebr. 
Blair, Nebr. 
Omaha, Nebr. 
Omaha, Nebr. 
Omaha, Nebr. 
Omaha, Nebr. 
Omaha, Nebr. 
Omaha, Nebr. 
Omaha, Nebr. 
Council Bluffs, Iowa 
Council Bluffs, Iowa 
Omaha, Nebr. 
LaPlatte, Nebr. 
Plattsmouth, Nebr. 
Rock Bluff, Nebr. 
Union, Nebr. 
Nebraska City, Nebr. 
Nebraska City, Nebr. 
Nebraska City, Nebr. 
Nebraska City, Nebr. 
Nebraska City, Nebr. 
Nebraska City, Nebr. 
Nebraska City, Nebr. 
Brownville, Nebr. 
Brownville, Nebr. 
Rulo, Nebr. 
658

OMAHA, NEBR., DISTRICT 
TABLE 21-F 
MISSOURI RIVER BASIN: PROJECTS IN OMAHA DISTRICT 
INCLUDED IN COMPREHENSIVE PLAN 
(See Section 23 of Text) 
Estimated Estimated 
Project Federal Cost Non-Federal Cost 
Garrison Dam, Lake Sakakawea, N. Dak.1 $297,175,300 $ - 
Missouri River Levee System, Iowa, Nebr., Kansas 
and Missouri (Sioux City, Iowa to Rulo, Nebr.)1, 3 21,180,000 2,200,000 
Oahe Dam - Lake Oahe, S. Dak. and N. Dak.1 341,763,000 
Big Bend Dam - Lake Sharpe, S. Dak.1 105,950,000 
Fort Randall Dam, Lake Francis Case, S. Dak.1 198,034,600 720,000 
Gavins Point Dam, Lewis & Clark Lake, S. Dak. & Nebr.1 49,614,250 
Omaha, Nebraska2 5,903,874 362,000 
Council Bluffs, Iowa2 2,557,680 145,800 
Missouri River, Garrison Dam to Lake Oahe, N. Dak.1 7,810,000 160,000 
1. Details presented on individual report. 
2. Completed. 
3. Active portion of project. 
659

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
(See Section 36 of Text) 
Month Inspected 
Aten, Nebr. 
Aurora, Colo., Detention Dam 
Bad River, Ft. Pierre, S. Dak. 
Belle Fourche, S. Dak. 
Big Horn River, Greybull, Wyo. 
Big Sioux River, S. Dak. and Iowa 
Blackbird Creek, Macy, Nebr. 
Cedar Island, Platte River 
Clarkson, Nebr., Maple Creek 
Council Bluffs, Mo. River Basin, Iowa 
Dry Creek, Hawarden, Iowa 
East Nishnabotna River, Red Oak, Iowa 
Floyd River, Sioux City, Iowa 
Fort Benton, Mont. 
Gering Valley, Nebr. 
Glasgow, Mont., Milk River 
Havre, Mont., Milk River 
Heart River, Mandan, N. Dak. 
Hooper, Nebr. 
Hot Springs Channel Improvement, S. Dak. 
Jefferson River, Waterloo, Mont. 
Little Papillion Creek, Nebr. 
Little Sioux River, Iowa 
Lower Heart River, N. Dak. 
Lower Madison River, Three Forks, Mont. 
Lower Papillion Creek, Nebr. 
Madison, Nebr. 
Marmarth, N. Dak. 
Missouri River, Garrison Dam-Lake Oahe 
Missouri River Levee System 
Niobrara, Nebr. 
Nishnabotna River, Hamburg, Iowa 
Norfolk, Nebr. 
Odebolt Creek, Ida Grove, Iowa 
Omaha, Mo. Riv. Basin, Nebr. 
Pierce, Nebr. 
Platte River, near Schuyler, Nebr. 
Red Dale Gulch, Rapid City, S. Dak. 
Saco, Mont., Milk River 
Salt Creek Levees, Lincoln, Nebr. 
Scranton, N. Dak., Buffalo Creek 
Shields River, near Clyde Park, Mont. 
Sioux Falls, S. Dak., Big Sioux River 
Sheridan, Wyo. 
Shoshone River, Lovell, Wyo. 
Spring Creek, Herried, S. Dak. 
Waterloo, Nebr. 
West Point, Nebr. 
Willow Creek-Jefferson Riv., Three Forks, Mont. 
Oct 1969 
Oct 1969 
Oct 1969 
Nov 1969 
Mar 1969 
Jul 1969 
Aug 1969 
Sep 1969 
Sep 1969 
Sep 1969 
Nov 1969 
Sept 1969 
Jul 1969 
Aug 1969 
Dec 1969 
Oct 1969 
Oct 1969 
Jul 1969 
Aug 1969 
Nov 1969 
Jul 1969 
Aug 1969 
Jul 1969 
Oct 1969 
Jul & Dec 1969 
Jul 1969 
Dec. 1969 
Oct 1969 
Oct 1969 
Sep 1969 
Jul 1969 
Oct 1969 
Nov 1969 
Sep 1969 
Sep 1969 
Oct 1969 
Jul 1969 
Dec 1969 
through 
through 
through 
through 
May 1970 
May 1970 
May 1970 
Jun 1970 
Apr & Jun 1970 
Jun 1970 
Jun 1970 
Jun 1970 
Jun 1970 
Jun 1970 
May 1970 
Jun 1.970 
May 1970 
Apr & Jun 1970 
Mar 1970 
Jun 1970 
May 1970 
Apr 1970 
Mar & Apr 1970 
Nov 1970 
Jun 1970 
Jun 1970 
Apr & Jun 1970 
May 1970 
Jun 1970 
Apr & Jun 1970 
May 1970 
Apr 1970 
Apr 1970 
Apr 1970 
May 1970 
Apr & Jun 1970 
Apr & Jun 1970 
660 
TABLE 21-G 
Location

OMAHA, NEBR., DISTRICT 
TABLE 21-G (Cont'd) 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
(See Section 36 of Text) 
Location Month Inspected 
Yellowstone River, Billings, Mont. Sep 1969 
Yellowstone River, Forsyth, Mont. Sep 1969 May 1970 
Yellowstone River, Greycliff, Mont. 
Yellowstone River, Livingston, Mont. Sep 1969 
Yellowstone River, Miles City, Mont. Sep 1969 
Yellowstone River, Reed Point, Mont. 
Yellowstone River, near Sidney, Mont. 
Yellowstone River, near Springdale, Mont. 
Yellowstone River, West Glendive, Mont. Sep 1969 May 1970 
661

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 21-H OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report For Construction Maintenance 
Battle Creek, Nebr.4 
1966 25,597 
Belle Fourche, Cheyenne River, S. Dak.2 
1940 37,410 
Belle Fourche, Redwater River and Hay Creek 
S. Dak.4 
1969 1,104 
Boulder, Colo. 1952 - 
Buffalo Creek, Scranton, N. Dak.5 1960 102,980 
Castlewood Lake, Cherry Creek and 
Tributaries, Colo.4 
1943 56,721 
City of Aurora, Westerly Creek, Colo. s 1955 150,000 
Clarkson, Nebraska, Maple Creek5 1967 191,281 
Council Bluffs, Iowa (Act of 1936)2 1939 325 
Council Bluffs, Iowa (Act of 1944)s 
1954 2,557,680 
Dayton, Wyo.4 
1956 - 
Dry Creek, Hawarden, Iowa5 
1964 400,000 
East Nishnabotna River, Red Oak, Iowas 1963 400,000 
Forsyth, Mont. s 
1950 255,177 
Giles Creek, Elkhorn, Nebr.1,'4 1952 - 
Glasgow, Mont.s 
1939 16,832 
Greybull, Wyo. s 
1960 248,507 
Havre, Mont.5 
1958 1,829,154 
Herreid, Spring Creek, S. Dak.s 
1954 50,216 
Hooper, Nebr.s 
1968 326,667 
Indian Creek Lake, Iowa4 
1969 135,133 
Jamestown Reservoir, N. Dak.5 
1950 40,000 
Lower Big Sioux River, Iowa and S. Dak. 1966 - 
Lower Heart River, N. Dak.s 
1964 1,961,173 
McCook Lake, S. Dak.5 
1958 147,627 
Madison, Nebr. Union and Taylor Creekss 1967 234,839 
Mandan, Heart River, N. Dak.s 1960 -676,916 
Marmarth, N. Dak.s 
1960 169,498 
Miles City, Mont.3 
1956 - 
Missouri River, Aten, Nebr.5 1951 578,791 
Missouri River, Niobrara, Nebr. s 1945 99,370 5,633 
Morrison, Bear Creek, Colo.4 
1950 30,000 
Mott, N. Dak.4 
Nishnabotna River at Hamburg, Iowas 1948 236,000 
Omaha, Nebr. s 
1954 5,903,874 
Pierce, Nebr.s 
1967 296,597 
Platte River near Schuyler, Nebr.5 1948 74,940 
Red Dale Gulch, Rapid City, S. Dak.s 1960 120,482 
Saco, Mont. s 1958 67,793 - 
Shell Creek, Nebr.3 1962 71,314 
Shields River, near Clyde Park, Mont.s 1951 25,747 
Shoshone River, Lovell, Wyo.s 1963 14,350 
Sioux Falls, S. Dak.s 1966 5,288,707 
South Platte River Levees and Channel 
Improvements, Chatfield Lake to 
Ft. Morgan, Colo.3 1957 10,000 
662

OMAHA, NEBR., DISTRICT 
TABLE 21-H (Continued) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report For Construction Maintenance 
Vermillion River, S. Dak.4 1968 207,767 
West Point, Nebr.5 1966 149,597 
Yellowstone River, W. Glendive, Mont.5 1960 230,294 
1. Reported in 1952 as 'Elkhorn River Basin Omaha 3. Deferred. 
District.' 4. Inactive. 
2. Completed as a Public Works Administration project. 5. Project Complete. 
FLOOD CONTROL ACTIVITIES UNDER SPECIAL AUTHORIZATION 
(Flood Control Activities Pursuant to Section 205, Public Law 858, 
80th Congress, as Amended) (Preauthorization) 
TABLE 21-1 (See Section 39 of Text) 
Fiscal Year 
Study Cost 
Dodge, Nebr. $ 320 
Emerson, Iowa - Indian Creek 1,268 
Livingston, Mont. - Yellowstone River and Fleshman Creek 2,012 
Main Ditch No. 6 near Hamburg, Iowa 97 
Meadow Grove, Nebr., Buffalo Creek 3,607 
Milk River, Malta, Mont. 1,515 
Roundup, Mont., Musselshell River 14,278 
Jefferson River, Three Forks, Mont. 21,464 
Milk River, Nashua, Mont. 2,707 
Elkhorn River near King Lake 2,713 
Antelope Creek, Hazen, N. Dak. 3,074 
Deer Trail, Colo. 2,595 
Sand Creek, Roggen, Colo. 2,835 
Cherokee, Iowa 2,664 
Mule Slough, Payne Junction, Iowa 2,851 
Garden Creek, Casper, Wyo. 2,451 
Total $66,451 
663

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COMPLETED FLOOD PLAIN INFORMATION STUDIES 
TABLE 21-J (See Section 47 of Text) 
Stream and Location Requesting Agency Date Completed Federal Cost 
West Branch Papillion Creek, City of Papillion, Nov 1963 $ 7001 
Papillion, Nebr. 
Wood River, Grand Island, 
Nebr. 
South Platte River 
Waterton to Brighton, 
Denver, Colo., Vol I 
Sand, Toll Gate, and Lower 
Cherry Creeks, Aurora, 
Colo., Vol. II 
Bear and Clear Creeks, 
Denver, Colo., Vol. III 
Big Dry Creek (Arap. Co.), 
Little Dry (Arap. Co.), 
Greenwood Gulch, Weir 
Gulch, Lakewood Gulch, 
South Lakewood Gulch, 
McIntyre Gulch, Little 
Dry Creek (Adams Co.), 
Grange Hall Creek, Vol. 
IV, Denver, Colorado 
Salt Creek, Haines Branch 
and Beal Slough, Lincoln, 
Nebr., Vol. I 
Antelope Creek, Dead Mans 
Run, and Middle Creek, 
Lincoln, Nebr., Vol. II 
Little Salt, Oak, Salt, and 
Stevens Creeks, Lincoln, 
Nebr., Vol. III 
Papillion, Big Papillion and 
West Branch Creeks, 
Omaha, Nebraska, Vol. I 
Little Papillion and South 
Branch Creeks, Omaha, 
Nebr., Vol. II 
Thomas Creek, Cole Creek, 
Hell Creek, West Branch 
Extension and Big Papillion 
Creek Extension, Omaha, 
Nebraska, Vol. III 
Dickinson Drainage Ditch 
Dickinson, North Dakota 
Left-Hand Creek, Vol. I, 
Boulder County, Colorado 
Boulder Creek and South 
Boulder Creek, Vol. II, 
Boulder County, Colorado 
Dry Creek, Vol. I, 
Cheyenne, Wyoming 
Crow Creek, Vol. II, 
Cheyenne, Wyoming 
Nebr. 
City of Grand Island, 
Nebr. 
Inter-County Regional 
Planning Commission, 
Denver, Colo. 
Inter-County Regional 
Planning Commission, 
and City of Aurora, 
Colo. 
Inter-County Regional 
Planning Commission, 
Denver, Colo. 
Denver Regional Council 
of Governments, 
Denver, Colorado 
Lincoln City- 
Lancaster County 
Planning Commission, 
Lincoln, Nebr. 
Lincoln City- 
Lancaster County 
Planning Commission, 
Lincoln, Nebr. 
Lincoln City- 
Lancaster County 
Planning Commission, 
Lincoln, Nebr. 
Papio Watershed Board 
Omaha, Nebr. 
Papio Watershed Board 
Omaha, Nebr. 
Papio Watershed Board 
Omaha, Nebraska 
City of Dickinson, 
North Dakota 
Denver Regional Council 
of Governments, 
Denver, Colorado 
Denver Regional Council 
of Governments, 
Denver, Colorado 
City of Cheyenne, 
Cheyenne, Wyoming 
City of Cheyenne, 
Wyoming 
Aug 1964 
Update Jun 1970 
Oct 1963 
Aug 1964 
Jan 1966 
Oct 1968 
Aug 1964 
Feb 1967 
Apr 1968 
Dec 1967 
Apr 1968 
May 1969 
Jun 1968 
Jan 1969 
Aug 1969 
Apr 1969 
Jun 1970 
9,400 
4,700 
52,000 
25,000 
38,000 
47,700 
15,000 
14,000 
15,000 
13,500 
20,000 
15,000 
9,500 
13,000 
15,600 
10,500 
11,300 
664

OMAHA, NEBR., DISTRICT 
TABLE 21-J (Cont'd) 
COMPLETED FLOOD PLAIN INFORMATION STUDIES 
(See Section 47 of Text) 
Stream and Location Requesting Agency Date Completed Federal Cost 
Garden Creek, Vol. I, City of Casper, Apr 1969 $ 8,000 
Casper, Wyoming Casper, Wyoming 
Sage Creek, Vol. II, City of Casper, Apr 1970 7,500 
Casper, Wyoming Wyoming 
Loup River, Columbus City of Columbus, May 1969 3,2002 
Metropolitan Region, Columbus, Nebr. 
Nebraska 
Yellowstone River, Vol. I, City of Billings, Oct 1969 19,100 
Billings, Montana Montana 
Alkali Creek, Vol. II, 
Billings, Montana 
1. Preliminary Study 
2. Flood Hazard Study 
665

OHIO RIVER 
For actual construction of locks and dams, and 
operation and care of completed structures, river is 
divided into three sections under immediate supervision 
and direction of district engineers at Pittsburgh, 
Huntington and Louisville. Pittsburgh section 
extends 127 miles from head of river at Pittsburgh, Pa., 
to a point near Hannibal, Ohio, and includes Emsworth, 
Dashields, Montgomery, New Cumberland and 
Pike Island locks and dams, and locks and dams 12, 13 
and 14. Huntington section extends 311 miles from 
mile 127 to 438 immediately upstream from Foster, 
Ky., and includes locks and dams 15 to 17, inclusive, 
Belleville, Racine, Gallipolis, Greenup, and Captain 
Anthony Meldahl locks and dams. Louisville section 
extends 543 miles from mile 438 to mouth of river, and 
includes Markland and McAlpine locks and dams 
(with Louisville and Portland Canal) and locks and 
dams 43 to 53, inclusive. 
IMPROVEMENTS 
Navigation Page 
1. Construction of locks and dams on 
Ohio River .................... ................. 667 
Navigation (cont.) Page 
Open channel work, Ohio River ........... 669 
NAVIGATION 
1. CONSTRUCTION OF LOCKS AND 
DAMS ON OHIO RIVER 
Location. Ohio River is formed by junction of 
Allegheny and Monongahela Rivers at Pittsburgh, Pa., 
and flows generally southwesterly for 981 miles to join 
Mississippi River near Cairo, Ill. For description of 
river see page 1227, 1932 Annual Report. 
Previous projects. For details see page 1907 of Annual 
Report for 1915. 
Existing project. Provides for improvement of entire 
river by construction of locks and dams to provide a 
channel depth of 9 feet and for widening Louisville and 
Portland Canal at Louisville, Ky. Project provides for a 
lock with usable dimensions of 110 by 600 feet at each 
of the dams and, in addition, an auxiliary lock 56 by 
360 feet is available at Emsworth, Dashields, Montgomery, 
and McAlpine locks and dams with an 
auxiliary lock at Gallipolis being 110 by 360 feet. 
Dashields is a fixed dam, while Emsworth, Montgomery, 
and Gallipolis are fixed dams with movable 
crests. Remaining dams are movable type, with 
navigable pass varying in width from 600 to 1,248 feet. 
In addition to navigable pass, movable-type dams are 
also provided with one or more regulating weirs. At 
McAlpine locks and dam a canal (Louisville and 
Portland) extends along left bank for 2 miles, with locks 
at lower end. Modifications to existing project under 
purview of Section 6, March 3, 1909 Act, provide for 
fixed dams with movable crests with two locks (110 by 
1,200 feet and 110 by 600 feet) at New Cumberland, 
Pike Island, Hannibal, Willow Island, Belleville, 
Racine, Greenup, Captain Anthony Meldahl, Markland, 
Canneltori, Newburgh, Uniontown, and Mound 
City, two locks 110 by 1200 feet at Smithland, a 110 by 
1200 foot temporary lock in addition to the existing 
lock at lock and dam 52, reconstruction to provide a 
110 by 1,200 foot lock in addition to existing locks and 
a fixed dam with two sections of movable crest at 
McAlpine locks and dam, widening Louisville and 
Portland Canal to 500 feet, and construction of a 
temporary 110 by 1200 foot lock at lock and dam 52. 
Operation and care of locks and dams were included in 
project July 1, 1935, under provisions of Permanent 
Appropriations Repeal Act of June 26, 1934. Estimated 
Federal cost of new work (existing project) 
(1970), exclusive of Gallipolis locks and dam reported 
under Kanawha River project is $1,290,367,302; 
estimated non-Federal cost is $9,089,000. Foregoing 
estimate does not include expenditures on previous 
projects. Various items previously included in this 
project are considered inactive or unnecessary and are 
excluded from foregoing cost estimate. See page 693, 
Annual Report, 1968 for items and estimated cost. 
Under authority of 1910 River and Harbor Act, 
Louisville and Portland Canal was widened to 200 feet; 
locks and dams 40 and 42 eliminated; locks and dams 1 
and 2 replaced by Emsworth locks and dam; lock and 
dam 3 replaced by Dashields locks and dam; and locks 
and dams 4, 5, and 6 replaced by Montgomery locks 
and dam. Locks and dams 24, 25, and 26 were replaced 
by Gallipolis locks and dam authorized by August 30, 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
667

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
1935 Act, and constructed under project for improving 
lower Kanawha River. Locks and dams 7, 8, and 9 
were replaced by New Cumberland locks and dam, 
locks and dams 10 and 11 were replaced by Pike Island 
locks and dam, locks and dams 18, 19 and 20 were 
replaced by Belleville locks and dam, locks and dams 
21, 22 and 23 were replaced by Racine locks and dam, 
locks and dams 27, 28, 29, and 30 were replaced by 
Greenup locks and dam, locks and dams 31, 32, 33, and 
34 were replaced by Captain Anthony Meldahl locks 
and dam, locks and dams 35, 36, 37, 38, and 39 were 
replaced by Markland locks and dam, and the 
Louisville and Portland Canal widened to 500 feet, as 
modifications to existing project under purview of 
section 6, March 3, 1909 Act, reducing total number of 
structures to 31. Table D contains data relative to 
various features of locks and dams included in existing 
project. For list of principal towns and cities along 
Ohio River with their mileage below Pittsburgh, Pa., 
see page 1060 Annual Report, 1962. See Table C for 
licenses. 
Terminal facilities. Modern public terminals, with 
warehouses, equipped with operating machinery for 
transferring materials, constructed by private interests 
at some of the larger cities and towns. A list of terminals 
on Ohio River is revised annually as of June 30, and 
can be obtained from Division Engineer, U.S. Army 
Engineer Division, Ohio River, Cincinnati, Ohio. 
Operations and results during fiscal year. New work by 
contract and hired labor: 
New Cumberland locks and dam: Real estate 
administrative work continued; $3,033. 
Pike Island locks and dam: Protective work for Ohio 
Route 7 immediately below the dam on the right bank 
was completed by hired labor; two tracts of land were 
acquired; $92,806. 
Hannibal locks and dam: Engineering and design 
studies continued; construction of locks, initiated in 
August 1967, was advanced to 96 percent completion; 
contract for construction of dam was awarded in June 
1970; acquired 298 tracts of land; $10,530,058. 
Willow Island locks and dam: Construction initiated 
in January 1967, is 28 percent complete; contract for 
construction of the locks, awarded in October 1968, is 
57 percent complete; 4,000,000 pounds of reinforcement 
steel, 2,000,000 pounds of structural steel 
and 225,000 cubic yards of concrete placed during 
fiscal year; engineering and design work for remaining 
construction work continued; 66 tracts of land were 
acquired; $12,154,456. 
Belleville locks and dam: Construction initiated in 
June 1962, is essentially complete; remaining work 
consists of: adjustment to Meigs Co. roads, Nos. 317 
and 318; contract awarded April 24, 1970, was 
advanced to 10 percent completion; reimbursable work 
to sewers, City of Parkersburg, W. Va., is 19 percent 
complete; and recreation facilities at Coolville, Ohio, 
advanced to 92 percent completion; 142 tracts of land 
were acquired; $296,104. 
Racine locks and dam: Construction initiated in 
June 1964, is 93 percent complete; contract for 
construction of dam, initiated in August 1967, is 97 
percent complete; 1,550,000 pounds of reinforcing 
steel, 3,500,000 pounds of structural steel and 100,000 
cubic yards of concrete placed during fiscal year; B&O 
RR relocation, initiated in fiscal year 1965, is essentially 
complete; contract for West Virginia Highway 
relocation, initiated in early fiscal year was 
completed; contracts for pool clearing were completed. 
63 tracts of land acquired; $7,974,356: 
Gallipolis locks and dam: Contract for construction 
of recreational facilities is complete; $483. 
Greenup locks and dam: All major construction 
work complete; minor amount of miscellaneous recreation 
work remains to be completed; total fiscal year 
cost of new work included $1,566 for recreation 
facilities under the completed projects program; $7, 
514. 
Captain Anthony Meldahl locks and dam: All major 
construction work complete; remaining work consists 
of planning and construction of recreational facilities 
at three sites, under the completed projects program, a 
minor amount of real estate audit and survey and 
mapping work; cost includes $90 for recreation 
facilities under the completed projects program; $9, 
880. 
Markland locks and dam: Final payment was made 
for relocation of sewers at Cincinnati, Ohio after 
settlement of lawsuit between the city and its contractor; 
administrative settlement and payment was 
made on two of the remaining claims by the dam 
contractor and a motion for reconsideration was made 
on the decision by the Engineer Board of Contract 
Appeals in favor of the same contractor on the last 
remaining claim. Materials were partially acquired for 
value synchronization mechanisms on locks filling and 
emptying systems; engineering and design was partially 
completed for additional facilities at two recreation 
sites; $140,510. 
McAlpine locks and dam: Project is essentially 
complete except for alteration of lift section of railroad 
bridge that spans the upper end of the Louisville and 
Portland canal which work is presently deferred. Final 
payment was made for completed construction at three 
recreation sites and construction of facilities at one 
other recreation site was completed. Partial installation 
was made of value synchronization mechanism on 
locks filling and emptying systems and engineering and 
design was partially completed for remote control 
system for dam gates; $67,113. 
Cannelton locks and dam: Project is 79 percent 
complete. Construction of dam and locks emergency 
dam was advanced to 67 percent completion and land 
acquisition was advanced to 98 percent completion; 
Relocation of Indiana and Kentucky roads was 
continued to 58 percent completion and utilities to 90 
percent completion. Maintenance dredging during 
construction was continued. Construction was completed 
on facilities at three recreation sites. En- 
668

OHIO RIVER 
gineering and design of remaining project features 
continued; $6,388,726. 
Newburgh locks and dam: Project is 45 percent 
complete. Locks construction was completed and 
contract for dam construction was awarded in June 
1970. Land acquisition was advanced to 79 percent 
completion and boundary line marking to 81 percent 
completion. Engineering and design of remaining 
project features continued; $876,163. 
Uniontown locks and dam: Project is 44 percent 
complete. Locks construction was completed and 
contract for dam construction was awarded in May 
1970 and attained 1 percent completion. Land 
acquisition was advanced to 25 percent completion. 
Engineering and design of remaining project features 
continued; $1,394,510. 
Smithland locks and dam: Engineering and design 
brought to about 30 percent completion; reservoir 
mapping by contract, suspended throughout the year 
for lack of funds, is 33 percent complete; hired labor 
operations involved geologic investigation of foundation 
conditions and preparation and issuance of 
plans and specifications for construction of lock 
cofferdam; $490,177. 
Lock and Dam No. 52 (New Lock): Project is 98 
percent complete; locks construction was completed 
and operation commenced in December 1969; engineering 
and design of final project features continued; 
$3,816,527. 
Mound City locks and dam: Engineering and design 
brought to about 20 percent completion; reservoir 
mapping by contract, suspended throughout the year 
for lack of funds, is 42 percent complete; hired labor 
operations involved geologic investigation of foundation 
conditions and formulation studies; $177,893. 
Operation and maintenance, general: Locks and 
dams operated as required and necessary repairs and 
improvements made thereto and to operator's quarters, 
grounds and esplanades. Costs were $2,622,074 for 
Pittsburgh District, $3,033,059 for Huntington District 
and $3,810,248 for Louisville District. 
Condition at end of fiscal year. Navigation system of 29 
locks and dams is in operation and 9-foot navigation 
throughout length of river is generally available at all 
times. At certain unstable bars project depth is 
maintained by dredging, supplemented by contraction 
works. (See "Open channel work, Ohio River.") Table 
D shows cost and year of completion of locks and dams 
now in operation. Existing project does not provide 
adequate facilities for present-day navigation due to 
obsolescence of structures. Since repair and modernization 
of these facilities would be extremely costly, 
replacement and reconstruction is being accomplished 
as rapidly as funds are made available for the purpose. 
Construction of lock and dam replacement program 
was initiated in fiscal year 1955. New Cumberland, 
Pike Island, Belleville, Racine, Greenup, Captain 
Anthony Meldahl, Markland, and McAlpine replacement 
locks and dams are in operation, replacing 
451-584 0-72-43 
24 old low-lift locks and dams. Construction of 
Hannibal locks and dam to replace locks and dams 12, 
13 and 14 was initiated in fiscal year 1966; Racine 
locks and dam initiated in fiscal year 1964 has replaced 
locks and dams 21, 22 and 23; Cannelton locks and 
dam to replace locks and dams 43, 44 and 45 was 
initiated in fiscal year 1962; Newburgh locks and dam 
to replace locks and dams 46 and 47 and Uniontown 
locks and dam to replace locks and dams 48 and 49 
were initiated in fiscal year 1965. For total cost of 
existing project, see table B. 
2. OPEN CHANNEL WORK, OHIO RIVER 
Location. Under jurisdiction of district engineer in 
whose district the work is located. Portion of river 
included in project extends 974.7 miles from head of 
river at Pittsburgh, Pa., to mouth of Cache River 
(Mound City, Ill.). Open channel improvement from 
mouth of Cache River to mouth of Ohio River is under 
jurisdiction of Mississippi River Commission. 
Existing project. Before completion of canalization 
project, no project depth had been fixed by Congress 
under project for open channel work, but in order to 
properly aid packet and barge navigation it was 
necessary to secure a low-water channel with a 
minimum depth of from 4 to 6 feet, and a width, 
depending upon difficulty of running channel, of from 
400 to 600 feet; also to permit movement of large coal 
tows, which movement occurred at stages of water 
exceeding 10 feet, it was necessary to remove points of 
projecting bars which formed at various locations along 
river. Accomplishment of this purpose involved concentration 
of current by closing back channels at 
islands with low dams, contraction and straightening 
wide, open channels by low dikes, dredging bars and 
shoals, and removal of snags and wrecks. Incidental to 
direct improvement of Ohio River is construction and 
maintenance of ice piers as required for protection of 
river craft. Stage of extreme high water on Ohio River 
varies from 46 feet at Pittsburgh, Pa., to 80 feet at 
Cincinnati, Ohio, with 57.2 feet at Louisville, Ky. 
(head of falls), 53.8 feet at Evansville, Ind., and 59.5 
feet at Cairo, Ill. (mouth of river). Estimated cost of 
new work (1960) is $16,160,000, exclusive of following 
items which are considered inactive: Ice piers authorized 
by 1927 River and Harbor Act; reforestation 
of sloughs on Kentucky Peninsula near Evansville, 
Ind., authorized by 1930 River and Harbor Act; 
dredging to widen channel at certain points; and 
placing revetment at various points. Estimated cost of 
these items (1954) is $6,565,000. Operation of snag 
boats on Ohio River below Pennsylvania State line was 
included in project July 1, 1935, under provisions of 
Permanent Appropriations Repeal Act of June 26, 
1934. See table E for authorizing legislation. 
Local cooperation. River and Harbor Act of January 
21, 1927, authorizing construction of ice piers for 
general open channel work, imposes condition that 
before work is begun on any pier, local interests convey 
69

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
to the United States free of cost such riparian rights as 
may be deemed necessary in connection with the 
improvement at locality (H. Doc. 187, 67th Cong., 2d 
sess.). Existing ice piers are adequate for present 
purposes and local cooperation is not needed since no 
additional construction is under consideration. River 
and Harbor Act of July 3, 1930, provides for reforestation 
of sloughs of Kentucky Peninsula and bank 
protection and that no expense shall be incurred by the 
United States for acquiring lands required for purpose 
of this improvement (H. Doc. 409, 69th Cong., 1st sess.). 
However, since no serious overbank erosion has 
occurred since bank revetment in 1933-34, reforestation 
is not considered justifiable at this time and 
no local cooperation is required. 
Operations and results during fiscal year. Operation and 
maintenance, general: Dredging, where required to 
provide an adequate and dependable channel of 
project depth at minimum pool conditions, was 
executed. Dike and revetments maintained and routine 
work of maintaining navigation aids, removing snags, 
making channel studies, hydrographic surveys and 
mapping was performed as required. Channel soundings, 
hydrographic surveys, stream gaging operations, 
channel inspections and aids to navigation, and 
miscellaneous inspections and reports cost $500,369. 
Dredging by hired labor: Huntington District 4,500 
cubic yards at $22,692 and Louisville District, 3,389, 
560 cubic yards at $844,586, and dredging by contract 
Huntington District 21,130 cubic yards at $31,550. 
Rehabilitation. Minor hired labor repair to the 
revetment at Kentucky Peninsula was completed in the 
fiscal year at a cost of $8,535. 
Condition at end of fiscal year. New work under this 
project is substantially complete, since it is not 
anticipated that work on inactive portion of project will 
be accomplished. In addition to dredging, local 
stabilization of channel has been effected at various 
points by construction of dikes and revetment. Work 
which remains consists of dredging to widen channels 
at certain points to project depth. 
670

OHIO RIVER 
TABLE A COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
Construction of New Work 
Locks and Dams Approp. $53,228,931 $64,069,284 $ 44,147,500 $51,714,502 $ 798,101,533, 3,s5,10 
on Ohio River Cost 50,394,425 60,204,365 54,413,913 44,420,309 785,060,5621,3,6 
Maint. 
Approp. 8,081,550 8,342,714 9,206,100 9,222,289 247,171,8902,4 
Cost 7,919,509 8,357,567 8,804,765 9,465,381 246,537,533 
Rehab. 
Approp. - - - - 1,283,510 
Cost - - - - 1,283,510 
2. Open Channel New Work 
Work, Ohio River Approp. - - - - 15,962,2608 
Cost - - - - 15,962,260 
Maint. 
Approp. 1,181,700 772,804 1,383,700 1,388,774 47,125,5747,9 
Cost 1,106,565 728,417 1,423,574 1,399,197 46,923,6747'9 
Rehab. 
Approp. - 461,000 548,000 -59,000 950,000 
Cost - 4,648 931,466 8,535 944,649 
1. Includes $17,003,761 for previous 6-foot canalization 6. Excludes $250,118 contributed funds for new work. 
project. 7. Excludes $1,621,349 expended in operation of snag boats 
2. Includes $36,943,217 expended from 1885 to 1937 on under provisions of permanent indefinite appropriation for such 
operation and care of work of improvement under provisions of purposes, and $267 transferred to project without 
permanent indefinite appropriations for such purposes. reimbursement. 
3. Includes $215,812 public works acceleration, executive 8. Includes $1,040,236 Public Works funds. 
1963. 9. Includes $1,000 for removal of obstructions in Licking 
4. Includes $38,766 public works acceleration, executive River under authority of section 3, R&H Act of 1930. 
1963. 10. Includes $4,217,000 placed in FY 1970 Budget Reserve 
5. Excludes $251,785 contributed funds for new work. for allocation in FY 1971. 
TABLE B TOTAL COST OF EXISTING PROJECT TO JUNE 30, 1970 
(See Section 1 of Text) 
Operations and 
Project Funds New Work Maintenance, Rehabilitation Total 
General 
Construction of Regular $763,383,784 $207,454,650 $1,283,510 $972,121,944 
Locks and Dams Public Works 3,258,368 - - 3,258,368 
on Ohio River 
Emergency Relief 1, 318,837 19,000 - 1,217,837 
Maintenance and Operation - 2,081,900 - 2,081,900 
Public Works Acceleration, 
Executive 1963 215,812 38,766 - 254,578 
Total $768,056,8011 $209,594,3162,4 $1,283,510 $978,934,6273 
1. Excludes surplus property valued at $297,385 transferred to project without reimbursement. 
2. Excludes surplus property valued at $73,832 transferred to project without reimbursement. 
3. Excludes $250,118 contributed funds for new work. 
4. Excludes $36,943,217 expended from 1885 to 1937 under permanent indefinite appropriation. 
TABLE C FEDERAL POWER COMMISSION LICENSES AT 
LOCKS AND DAMS, OHIO RIVER 
Markland Dam McAlpine Dam 
F. P. C. License 2,211 289; 1,000 
Licensee Public Service Co. of Indiana Louisville Gas and Electric Co. 
Annual Charge $45,950.00 $95,000 (#289) 
$6.60 (#1,000) 
Collections to end of $135,961.64 $3,990,271.56 
fiscal year 1970 
671

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE D OHIO RIVER LOCKS AND DAMS 
(See Section 1 of Text) 
Lock Dimensions Upper 
Normal 
WidWth idthGL reenagttehs t PPooooll Depth on Year Actual Cost 
Lock Be Distance from of Eleva- Miter Sills Character of Foundation Percent Oed t te 
SBelow Distance from Ch Available Lift ion Co- Opened to Date of 
Project Pitts- Nearest Town for Full (feet) e Lock Dam e to Navi- Each Lock Damburg h (fbeert) W(feidett)h meeeatn, U(fpepete)r (feet) gation and Dam 
sea 
level) 
Construction of 1 - Replaced - 
Locks and Dams 6.2 Emsworth locks and dam, 110 
on Ohio River Emsworth, Pa. 56 
2 - Replaced - 
3 - Replaced - 
13.3 Dashields locks and dam, 110 
1.6 miles below Sewick- 56 
ley, Pa. 
4 - Replaced - 
5 - Replaced 
6 - Replaced - 
31.7 Montgomery locks and 110 
dam, 1.4 miles above 56 
Industry, Pa. 
7 - Replaced - 
8 - Replaced - 
54.4 New Cumberland locks and 110 
dam, Stratton, Ohio 110 
9 - Replaced - 
10 - Replaced - 
11 - Replaced - 
84.3 Pike Island locks and da, 110 
2 miles upstream from 110 
Warwood, W. Va. 
12 87.4 Warwood, W. Va. 110 
13 96.1 McMechen, W. Va. 110 
14 114.0 Woodland, W. Va. 110 
126.4 Hannibal locks and dam, 110 
1.6 miles upstream from 110 
New Martinsville, W. Va. 
15 129.1 New Martinsville, W. Va. 110 
16 146.5 Bens Run, W. Va. 110 
161.7 WillowIsland, locksand 110 
dam, 2.7 miles above 110 
Waverly, W. Va. 
17 167.5 4.5 miles above Marietta, 110 
Ohio 
18 - Replaced 
19 - Replaced - 
20 - Replaced - 
203.9 Belleville locks and dam, 0.3 110 
mile below Reedbville, 110 
Ohio 
21 214.6 1.4 miles above Portland, 110 
Ohio 
18.0 710.0 20.01'4 12.93 Rock 
15.51,' 12.93 
10.0 692.0 13.41 17.53 Rock 
17.5 682.0 16.11 
600 
360 
600 
360 
600 
360 
1,200 
600 
1,200 
600 
600 
600 
600 
1,200 
600 
600 
600 
1,200 
600 
600 
1,200 
600 
600 
664.5 
644.0 
626.2 
617.8 
610.5 
623.0 
602.2 
594.4 
602.0 
586.6 
17.11 
17.01 
15.4 
13.8 
16.4 
38.0 
15.4 
15.4 
35.0 
15.4 
14.63 Rock and piles 
14.83 Rock 
18.03 Rock 
11.0 Piles in sand 
and gravel 
10.4 Piles in sand 
and gravel 
11.0 Rock 
17.0 Rock 
11.0 Rock 
11.2 Rock 
15.0 Rock and piles 
11.0 Rock 
22.0 582.0 37.0 15.0 Rock and piles 
5.6 567.0 15.4 11.0 Rock and piles 
- 
672 
- - - $ 870,034 
Rock and piles 100 1921 5,861,7652 
-- - 976,767 
- - - 1,144,588 
Rock 100 1929 3,528,955 
- - - 1,071,472 
-- - 1,080,132 
- - - 1,123,442 
Rock and piles 100 1936 5,737,611 
-- - 1,075,000 
- - - 1,167,456 
Rock 100 1959 38,822,604 
- - - 11,177,100 
- - - 1,138,000 
- - - 1,162,165 
Rock 100 1963 56,588,656 
Piles in sand 100 1916 1,166,104 
and gravel 
Rock; piles in 100 1911 1,222,389 
sand and gravel 
Rock 100 1917 1,133,371 
Rock 44 - 35,410,1896 
Rock 100 1916 1,180,478 
Rock 100 1917 1,275,532 
Rock 28 - 21,032,9017 
Rock 100 1918 1,362,591 
- - - 927,091 
- - - 1,213,848 
- - - 936,696 
Rock 99 - 61,626,857 
Rock 100 1919 1,484,562 
22.6 
17.8 
8.4 
7.3 
8.3 
21.0 
7.8 
7.8 
20.0 
8.2

OHIO RIVER 
TABLE D (Continued) OHIO RIVER LOCKS AND DAMS 
(See Section 1 of Text) 
Lock Dimensions Upper 
Normal 
Greatest 
Width Greatest Pool Depth on 
Lock Be Distance from of e ift Eleva- Miter Sills Character of Foundation Percent Opened o Date of 
Project ta nd BPetltosw- NDeisatraensct eT forwomn Choafi n- Available lift tion Ue orDto Navi- Each Lock for Full (feet) (e, UCom-teNoaLo 
Dam burghbe Width (fet, UppLock Dam plete vi- Each Lock 
(feet) (feet) mean (feet) (feet) gation and Dam 
sea 
level) 
Construction of 22 220.9 Ravenswood, W. Va. 110 
Locks and Dams 23 231.4 Millwood, W. Va. 100 
on Ohio River 237.5 Racine locks and dam, 1.5 110 
(Cont'd) miles below Letart Falls, 110 
Ohio 
24 Replaced 
25 - Replaced 
26 - Replaced 
279.2 Gallipdlis locks and dam, 0.7 110 
mile below Hogsett, W.Va. 110 
27 - Replaced 
28 - Replaced 
29 - Replaced 
30 - Replaced 
341.0 Greenup locks and dam, 4.9 110 
miles below Greenup, Ky. 110 
31 - Replaced - 
32 - Replaced 
33 - Replaced - 
34 - Replaced 
436.2 Captain Anthony Meldahl 110 
locks and dam, 2.2 miles 110 
above Foster, Ky. 
35 - Replaced - 
36 - Replaced 
37 - Replaced - 
38 - Replaced 
531.5 Markland locks and dam, 1 110 
mile above Markland, Ind. 110 
39 - Replaced 
40 
600 7.8 551.4 
600 5.6 543.6 
1,200 
600 22.0 560.0 
600 
360 26.0 538.0 
1,200 
600 30.0 515.0 
15.4 11.2 Rock and piles Rock 
15.4 13.5 Rock and piles Rock 
18.0 15.0 Rock and piles Rock 
18.0 12.0 Rock 
18.01 13.0 Rock 
1,200 
600 30.0 485.0 18.0' 15.0 Rock 
1,200 
600 35.0 455.0 50.0 15.0 Rock 
Rock 
Rock 
Rock 
100 1918 $ 1,218,798 
100 1921 1,851,488 
93 - 61,562,9658 
- - 1,187,542 
-- 1,925,205 
- - 1,307,241 
100 1937 9 
- - 2,015,601 
- - 1,063,133 
- - 1,088,802 
- - 1,579,618 
100 1959 55,704,170 
- - 1,359,231 
- - 2,951,216 
- - 1,937,166 
- - 3,437,057 
100 1962 73,899,738 
- - 1,894,942 
- - - 3,704,535 
- - - 1,297,924 
- - - 2,857,040 
Piles 100 1963 61,834,309 
- - - 2,222,448 
- Eliminated 
604.4 McAlpine locks and dams. 110 
(Reconstruction of locks 110 
and dam 41.) 56 
43 633.2 3.3 miles below West 110 
Point, Ky. 
44 663.2 Leavenworth, Ind. 110 
45 703.0 Addison, Ky. 110 
720.7 Cannelton locks and dam, 3 110 
miles above Cannelton, Ind. 1 f0 
46 757.3 Owensboro, Ky. 110 
776.1 Newburgh locks and dam, 110 
16 miles above Evansville, 110 
Ind. 
47 
48 
49 
777.7 Newburgh, Ind. 110 
809.6 5.8 miles below Henderson, 110 
Ky. 
845.0 2.4 miles below Uniontown, 110 
Ky. 
1,200 
600 37.0 420.0 
360 
600 9.0 383.0 
600 7.0 374.0 
600 9.0 367.0 
1,200 25.0 383.C 
600 
600 11.0 358.0 
1,200 
600 16.0 358.0 
600 9.0 347.0 
600 7.0 338.0 
600 11.0 331.0 
49.0 12.0 
19.0 11.0 Rock 
19.0 11.0 
15.0 11.0 Pile 
15.4 13.0 Pile 
17.4 13.0 Rock 
38.0 15.0 Rock 
17.4 11.0 Pile 
32.0 12.0 Rock 
Rock 
Pile 
Rock and pile 
Rock and pile 
Rock 
Pile 
Pile 
7,658,13410 
10011 1961 45,521,048 
100 1921 2,592,242 
100 1925 2,819,930 
100 1927 3,202,890 
79 - 67,014,33912 
100 1928 3,129,028 
45 - 34,544,59713 
15.4 11.6 Pile Pile 100 1928 4,415,526 
15.4 13.0 Pile Pile 100 1922 3,062,710 
17.4 13.0 Rock Rock 100 1928 3,325,964 
673

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE D (Continued) OHIO RIVER LOCKS AND DAMS 
(See Section 1 of Text) 
Lock Dimensions Upper 
Normal 
Width Greatest Pool 
Lock Miles of Lengh Eleva- Depth on 
c Below Distance from C Available Lift tion Miter Sills Year Actual Cost 
Project and Pitts- Nearest Town beam for Full (feet) on Mter S Character of Foundation Percent Opened to Date of 
Dbuarmgh (feet) W(feidetth) mseeaann U(fpepte r L(ofweertCom- to Navi- Each Lock 
sea (feet) (feet) Lock Dam plete gation and Dam 
level) 
Construction of 846.0 Uniontown locks and dam 110 1,200 
Locks and Dams 3.5 miles below Union- 110 600 22.0 342.0 34.0 12.0 Rock Rock 44 - $29,888,26514 
on Ohio River town, Ky. 
(Cont'd) 50 876.8 1 mile below Weston, Ky. 110 600 10.0 320.0 17.4 11.0 Rock Rock and pile 100 1928 3,751,762 
51 903.1 0.6 mile below Golconda, Ill. 110 600 8.0 310.0 15.4 11.0 Rock and pile Pile 100 1929 4,370,566 
918.5 Smithland locks and dam, 2 110 1,200 
miles above �mithland, Ky. 110 1,200 22.0 324.0 34.0 12.0 Rock Rock 1,420,19015 
52 938.9 1.4 milesbelow Brookport, 110 600 12.0 302.0 15.4 11.0 Pile Pile 100 1928 4,461,747 
Ill. 
938.9 1.4 miles below Brookport, 110 1,200 12.0 302.0 15.4 11.0 Pile Pile 98 1969 9,977,248 
Ill. (new lock) 
53 962.6 10.8 miles above Mound 110 600 13.4 290.0 15.4 9.616 Pile Pile 100 1929 5,410,668 
City, Ill. 
974.2 Mound City locks and dam, 110 1,200 
1 mile below Mound City, 110 600 31.0 302.0 46.0 15.0 Pile Pile 1,101,16617 
Ill. 
54 974.2 Mound City, Ill. 
Total $778,066,54518 
1. Depths are on emergency dam foundation and are controlling depths. 
2. Change from fixed dam to lift-gate dam completed in 1938. 
3. Depths are on poiree dam foundation and are controlling depths. 
4. Land chamber. 
5. River chamber. 
6. Will replace locks and dams 12, 13, and 14. 
7. Will replace locks and dams 15, 16, and 17. 
8. Will replace locks and dams 21, 22, and 23. 
9. Roller-gate dam. Cost not included in total. Constructed under project 
for improving lower Kanawha River. 
10. Lock and dam 41 completed with 110- by 600-foot lock in 1921. Completed 
with new dam and raised canal and lock walls in 1928. Auxiliary lock 
constructed in 1929-30. Reconstruction and modernization began 1956, renamed 
McAlpine locks and dam in 1960. 
11. Complete except for deferred alteration of railroad bridge. 
12. Will replace locks and dams 43, 44, and 45. 
13. Will replace locks and dams 46 and 47. 
14. Will replace locks and dams 48 and 49. 
15. Will replace locks and dams 50 and 51. 
16. Dam below not yet constructed. Depth on lower miter sill at low water. 
17. Will replace locks and dams 52 and 53 and eliminate 54 from project. 
18. Exclusive of $6,994,018, details below. 
Additional Features Entering into Cost of Project 
Louisville and Portland Canal and Indiana chute (under 
previous project) 
Examinations, surveys, contingencies, plants and 
miscellaneous 
Recreation facilities, pool area, Gallipolis locks and dams 
Total 
$ 5,359,203 
966,232 
668,583 
6,994,018 
$785,060,562 
674

OHIO RIVER 
TABLE E AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
OPEN CHANNEL WORK, OHIO RIVER (See Section 2 of Text) 
March 3, 1827 Project adopted by this act originally covered entire 
length of Ohio River from its mouth near Cairo to 
Pittsburgh, a distance of 981 miles. It provided for 
removal of all obstructions which tend to endanger 
steamboat navigation. 
Jan. 21, 1927 Construct ice piers as a part of project, with funds H. Doc. 187, 67th Cong., 2nd sess. 
allotted from appropriations for general open channel 
work. 
July 3, 1930 Reforestation of sloughs on Kentucky Peninsula near H. Doc. 409, 69th Cong., 1st sess. 
Evansville, Ind., and a 200-foot strip along upstream 
bank and for bank protection, at an estimated cost of 
$200,000. 
July 3, 1958 Act of Mar. 3, 1827 modified to include maintenance H. Doc. 434, 84th Cong., 2nd sess. 
of existing Licking River Channel within lower 3-mile 
limit of River slack water, at an estimated increase of 
$1,000 in cost of average annual maintenance. 
675

NASHVILLE, TENN., DISTRICT* 
This district comprises portions of southern Kentucky, 
southwestern Virginia, western North Carolina, 
northern Georgia and Alabama, northeastern Mississippi 
and practically all of Tennessee except western 
portion, and embraces drainage basins of Tennessee 
and Cumberland Rivers and their tributaries. 
IMPROVEMENTS 
Navigation 
1. Cumberland River, Tenn. and Ky. ...... 
2. Tennessee River, Tenn., Ala., and Ky. 
3. Other authorized navigation projects .... 
Alteration of Bridges 
4. Authorized Alteration of Bridges ........... 
Flood Control 
5. Cumberland, Ky. ........................... 
6. Evarts, Ky. ................................... 
7. Martins Fork Lake, Ky................ ....... 
8. Middlesboro, Cumberland River Basin, 
K y . ......................................................... 
9. Ohio River Basin (Nashville Dist.) ....... 
10. Inspection of completed flood control 
projects ........................................... 
11. Other authorized flood control projects 
12. Flood control work under special 
authorization ........................................ 
Page 
677 
680 
682 
682 
682 
683 
683 
684 
684 
684 
684 
Multiple-Purpose Projects Including Power Page 
13. Center Hill Lake, Ohio River Basin, 
Tenn. ........................................ 684 
14. Dale Hollow Lake, Ohio River Basin, 
Tenn. and Ky. ................................... 685 
15. J. Percy Priest Dam and Reservoir, 
Ohio River Basin, Tenn .................. 685 
16. Lake Cumberland (Wolf Creek Dam), 
Ohio River Basin, Ky. ..................... 686 
17. Laurel River Lake, Ky. ....................... 686 
18. Other authorized multiple-purpose 
projects including power ................... 686 
19. 
20. 
684 21. 
General Investigations 
Surveys .......................................... ....... 686 
Collection and study of basic data ....... 686 
Research and development ..................... 687 
NAVIGATION 
1. CUMBERLAND RIVER, TENN. AND 
KY. 
Location. Formed by junction of Poor and Clover 
Forks in Harlan County, Ky., about 694.2 miles above 
its mouth, and flows west to Burnside, Ky., from 
whence it makes a loop southwestward into Tennessee, 
passes Nashville, and returns northwestward to Kentucky, 
emptying into Ohio River near Smithland, Ky. 
(See Geological Survey base maps of Tennessee and 
Kentucky.) 
Previous projects. For details see pages 1898 and 1901 
of Annual Report for 1915, and page 1208 of Annual 
Report for 1938. 
Existing project. Below Nashville: Prior to adoption of 
9-foot navigable channel defined in succeeding paragraphs, 
project for this section of river provided for 
construction of locks and dams A, B, C, D, E, and F, 
and dredging in the 43.6 miles from lock F to mouth to 
secure 6-foot navigation at extreme low water from 
mouth to lock and dam 1, Nashville, Tenn., (188.4 
miles above mouth), first lock constructed under 
project for section of river above Nashville. Surmounting 
of dams A to F with movable crests was also 
provided. Dredging in lower river was made unnecessary 
by construction of lock and dam 52, Ohio 
River, which created a pool of more than 6-foot depth 
from lock F to mouth. Cost of new work for completion 
of 6-foot navigation project was $4,706,883, excluding 
amounts expended on previous projects. For pertinent 
data concerning locks and dams A to F, see page 1070 
of Annual Report for 1962. Improvement of Cumberland 
River between mouth and Nashville was 
authorized for 9-foot navigation; increased project 
depth to be obtained by construction of three moderate 
height dams with lockage facilities, designated at 
Kuttawa (Eureka), Dover, and Cheatham, to replace 
existing locks A to F, inclusive, below Nashville, and 
lock 1, above Nashville. (See paragraph 22-B for 
authorizing legislation.) Subsequent authorities provided 
for construction of hydroelectric power-generating 
facilities at Cheatham Dam, river mile 148.7, 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
677

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
and modification of project for navigation on Cumberland 
River, Tenn. and Ky., to provide, in lieu of 
previously authorized works at Kuttawa, mile 32.2, 
and Dover, mile 100.1, for construction of a multiplepurpose 
improvement for navigation, flood control, 
and hydroelectric power consisting of a dam, lock, and 
powerplant near mile 30.6 on lower Cumberland River 
and a canal for navigation and other purposes 
connecting proposed reservoir with reservoir formed by 
Kentucky Dam on the Tennessee River. The project is 
known as Barkley Dam and Lake Barkley. Provision of 
interconnecting canal, involving excavation of a 
channel through narrow watershed divide about 2.5 
miles upstream from damsite, will make alternative 
routes available for navigation between either Cumberland 
or Tennessee Rivers and Ohio River, and will 
afford integrated operation of Barkley and Kentucky 
Reservoirs through diversion of flows in interests of 
flood control and power production. Estimated cost of 
modified project for 9-foot navigation and multiplepurpose 
development is $174,873,900 (July 1970). (See 
table 22-C for listing of principal features.) 
Under flood conditions as regulated by upstream 
reservoirs, extreme fluctuation in stage of river below 
Nashville, Tenn., varies at different localities from 
about 16 to 55 feet above minimum pool levels. 
Ordinary fluctuations vary with power flows from as 
much as the allowable 3-foot drawdown below normal 
pool elevation 385 at Cheatham Lock and Dam to a 
range of about 7 feet at Nashville. Seasonal variation in 
normal headwater levels at Lake Barkley is 5 feet, 
which in combination with power flows produces 
fluctuations up to 10 feet below Cheatham Lock and 
Dam. 
Above Nashville: Authorization (See Table 22-B) 
provided for construction of locks and dams 1 to 17 and 
21 to secure 6-foot navigation at low water from 
Nashville (lock and dam 1, 188.4 miles above mouth) 
to Waitsboro Shoals (324.6 miles), and 4-foot navigation 
from Waitsboro Shoals to Burnside (3 miles); 
provision also being made for periodic removal of snags 
and similar obstructions from Nashville (lock and dam 
1) to Burnside (327.6 miles). Project was modified by 
raising dam No. 1 by 3 feet. Locks and dams 1 to 8, 
inclusive, and 21 were completed and placed in 
operation during 1888 through 1924. Raising dam 1 by 
installation of crest wickets was completed in October 
1931. Proposed locks and dams 16 and 17 were 
eliminated from project upon authorization of Lake 
Cumberland (Wolf Creek Reservoir), construction of 
which has also resulted in permanent inundation of 
lock and dam 21. Further consideration of previously 
projected locks and dams 9 through 15, inclusive, is 
precluded under existing project as modified which 
resulted in replacing locks and dams 1-8. For 
statistical data concerning lock and dam 8, placed in 
an inoperative status in 1951, see page 1694 of Annual 
Report for 1950; together with details on locks and 
dams 1 to 7 and 21, displaced, and other structures 
originally contemplated under project (pp. 1694 and 
1695). Construction of Old Hickory, Carthage, and 
Celina Dams above Nashville was also authorized for 
navigation and power. The dam and reservoir authorized 
for construction on Cumberland River near 
Carthage, Tenn., has been redesignated as Cordell 
Hull Dam and Reservoir. Cost of Old Hickory and 
Cordell Hull projects, including locks, is estimated as 
$124,835,100 (July 1970). Estimated cost of Celina 
Dam (1959) is $39,100,000. (See table 22-C at end of 
chapter for listing of principal features.) 
Under flood conditions as presently regulated, 
including effect of surcharge operation of Old Hickory 
project, extreme fluctuations of stage in this section of 
river vary from a range of 35 feet at Nashville (mile 
191) to a maximum of 46 feet immediately below Old 
Hickory Dam (mile 216.2), and from an 8-foot 
variation in headwater at dam to 36 feet in vicinity of 
Carthage, Tenn. (mile 313.5), present head of navigation; 
with variations up to 35 feet at Celina, Tenn. 
(mile 380.8) and 29 feet in tailwater at Wolf Creek 
Dam (mile 460.9). Maximum fluctuations under 
ordinary conditions from power flows vary from about 
7 feet at Nashville to 14 and 3 feet, respectively, in 
tailwater and headwater of Old Hickory Dam, and at 
other key points as follows: 13 feet at Carthage; 18 feet 
at Celina; and 19 feet at Wolf Creek Dam. 
Further details on project authorization for river 
sections below and above Nashville are shown on Table 
22-B. 
Local cooperation. Fully complied with for 6-foot 
navigation project. Under modified project for 9-foot 
navigation and multiple-purpose development, recreation 
features of reservoir components are subject to 
certain conditions of non-Federal cost-sharing under 
Federal Water Project Recreation Act of 1965. 
Terminal facilities. At Nashville, Tenn., there is a 5- 
story terminal building 300 feet long and 140 feet wide, 
built of reinforced concrete with large and convenient 
loading platforms, electric elevator and gantry crane, 
with railroad connections, municipally owned and 
open for public use. There is an additional terminal, 
privately owned, with modern facilities and railroad 
connections, also available for public use. Major oil 
companies have constructed terminals for transfer of 
petroleum products. There are also privately owned 
terminals at Nashville for transfer of sand and gravel, 
cement, scrap metals, sulphuric acid and molasses; at 
Old Hickory, Tenn., for transfer of chemicals; at 
Burnside, Ky., for transfer of coal; at Clarksville, 
Tenn., for transfer of sand and gravel; and near 
Smithland, Ky., for transfer of limestone. Governmentowned 
facilities for transfer of coal are at Cumberland 
City Steam Plant. In addition there are many 
unimproved private landings along river. Facilities 
considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Below Nashville: Paving of roads and parking areas in 
Cheatham lock operations building and service area 
was accomplished under contract. Construction of left 
678

NASHVILLE, TENN., DISTRICT 
bank sewerage improvements, Cheatham project, was 
contracted near end of the year and work initiated. 
Reconstruction of a launching ramp below Cheatham 
Dam was performed by hired labor. Work continued 
under contract for an additional switchyard bay at the 
Barkley powerplant. Construction of public-use facilities, 
comfort stations, and washhouses for two sites, 
Barkley project, was contracted prior to end of the 
year. Miscellaneous small items construction and 
installation operations relating to dam and powerplant 
and buildings and grounds were performed by hired 
labor, as were preparation and issuance of plans and 
specifications for work contracted during the year. 
Costs for new work were $484,562. 
Above Nashville: Construction of sewage treatment 
plant and public use facilities at Shutes Branch site, 
Old Hickory project, under two contracts was completed. 
Incident to construction of Cordell Hull project, 
construction of the powerplant was contracted and 
work undertaken. Under cost reimbursable contract 
previously entered into with the State of Tennessee for 
relocation and adjustment of roadway facilities in the 
reservoir area, operations were continued. Operations 
were completed under relocation contracts covering 
telephone lines of the North Central Telephone 
Cooperative Corp., and continued under contracts for 
power and telephone lines of the Upper Cumberland 
Electric Membership Corp., and the Twin Lakes 
Telephone Cooperative Corp., respectively. Work was 
completed under contracts for roadway and bridge 
relocations in Smith County portion of reservoir, and in 
Jackson County (first portion). Work was continued 
under supply contracts for 3-58,200 hp turbines, 
3-37,037 kva generators, 3-42,700 kva transformers, 
13.8 kv metal-clad switchgear, generator neutral 
grounding equipment, metal-enclosed bus structures, 
and lock feeder unit substation for the powerplant. 
Supply contracts were awarded for 275-ton powerhouse 
crane; main control switchboards and appurtenant 
equipment; 3-58,200 hp hydraulic governors; 
draft tube gantry crane; 480-volt station service 
switchgear and transformers; 70-ton gantry crane; 161 
kv outdoor oil circuit breakers; carrier current coupling 
equipment; lightning arresters; transformers; disconnect 
switches and insulators; and carrier transmitter 
receiver equipment. Reservoir boundary line 
marking, preparation of plans and specifications, and 
miscellaneous small items construction and installations 
operations relating to dam and powerplant 
were accomplished by hired labor. Project lands 
acquired totaled 4,082 acres. Costs for new work were 
$7,100,154. 
Operation and maintenance: Barkley, Cheatham, 
and Old Hickory locks and dams were operated as 
required. Maintenance and improvement operations 
included unwatering lock valves and modification of 
slowdown gate operating controls, cleaning and rustproofing 
spillway gates and gate chains at the Barkley 
project; completion of powerplant remote control 
facilities, installation of piling and riprap for spillway 
gate bulkhead storage area, replacement of anchor bars 
on lower lock gate, and replacement of hydraulic lines 
across upper gate sill at Cheatham; unwatering and 
repair of lock gates, stabilization of miter sills, and 
overhaul of floating mooring bitts at Old Hickory; and 
regalvanizing handrails at Cheatham and Old Hickory 
locks. Temporary maintenance was continued as 
necessary at Cordell Hull lock pending placement in 
permanent operation. Operation of powerplants was 
continuous except for normal interruptions and necessary 
shutdowns for inspection and maintenance 
purposes. Total net energy generated at Barkley Dam 
(688,822,728 kw-hr) was made available through 
Department of the Interior to the Tennessee Valley 
Authority, Southern Illinois Power Cooperative, Big 
Rivers Rural Electric Cooperative Corporation, and 
Indiana Statewide Rural Electric Cooperative, Inc., 
Hoosier Energy Division. Total net energy generated 
at Cheatham Dam (170,588,500 kw-hr) and Old 
Hickory Dam (459,364,036 kw-hr) was made available 
to the Tennessee Valley Authority for distribution. 
Power revenues were $2,041,000, $772,000, and $1,370, 
000, respectively. Benefits attributable to Barkley effect 
in reduction of flood flows on Cumberland and lower 
Ohio and Mississippi River during year are estimated 
as $602,000. Activities under reservoir management 
program comprising malaria control, shoreline sanitation, 
land management and disposal, and maintenance 
of public-use facilities continued. Channel 
snagging and dredging was done by hired labor. 
Condition at end of fiscal year. Below Nashville: Locks 
and dams A to F, inclusive, completed under 6-foot 
navigation project for this section of river, had been 
replaced by Barkley and Cheatham locks and dams. 
Under authorized modification of existing project for 
multiple-purpose development, including further improvement 
below Nashville for 9-foot navigation, new 
work as a whole is about 99 percent complete. 
Construction of Cheatham lock and dam was completed 
in November 1960. See page 1078 of 1962 
Annual Report for chronology of construction. Under 
authority for provision of additional recreational 
facilities at completed projects to meet increased 
public-use demands, 11 boat launching ramps have 
been graded and paved and the following installed: 100 
picnic and camping units and 4 shelters; 56 grills; and 
12 comfort stations. Construction of left bank sewerage 
improvements initiated near the close of the fiscal year, 
and proposed additional recreational facility construction 
remain for accomplishment under Cheatham 
project. Work under contract for provision of an 
additional switchyard bay at Barkley powerplant was 
complete. Work was not commenced on construction of 
public-use facilities, comfort stations, and washhouses 
for two sites contracted near the end of the year. With 
exception of a permanent transfer of about 5,946 acres 
in fee and a use permit (flowage rights) over 537 acres 
from Tennessee Valley Authority, all land requirements 
of the project have been acquired. After 
excluding disposals of 13,383 acres in fee and 99 acres 
679

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
in easements, a net total of 101,459 acres remain in the 
project (69,735 acres, fee; 24,357 acres, easement; and 
7,367 acres under use permit). Barkley project as a 
whole is about 99 percent complete and in full 
operation. Lock was opened to navigation on July 8, 
1964. The four power units were placed in commercial 
operation January 21, February 4, March 7, and 
March 30, 1966. Total new work costs for this section to 
June 30, 1970, were $178,475,678 including $685,000 
public works funds. 
Above Nashville: Prior to modification of existing 
project for this section of river in 1946, locks and dams 
1 to 8, inclusive, and 21 had been completed; initiation 
of work on lock and dam 1 in September 1888 marking 
commencement of construction under project. For 
dates on which completed structures were placed in 
operation, see table under "Existing project," Annual 
Report for 1950. Lock and Dam 21, completed in 
October 1911, has since been inundated by Lake 
Cumberland which also eliminated projected locks and 
dams 16 and 17. Lock and dam 1 was demolished in 
connection with construction of Cheatham project 
below Nashville. Lock and dam 2 was demolished with 
construction of Old Hickory project, which inundated 
locks and dams 3 through 7. Old Hickory project 
provides a through channel for 9-foot navigation on the 
Cumberland above Nashville to vicinity of Carthage, 
Tenn., at river mile 313.5, present head of navigation. 
Lock and dam 8, placed in an inoperative status 
November 30, 1951, has been displaced with partial 
impoundment of Cordell Hull Reservoir which, upon 
project completion, will extend the 9-foot waterway to 
the Celina damsite, river mile 385.4, at the 
Kentucky-Tennessee State Line. New work under 
authorized modification of existing project for this 
section of river, as a whole, is 60 percent complete. Old 
Hickory project was completed for full beneficial use 
December 1957 with placement of last power unit in 
commercial operation. Further details are given on 
page 1080 of Annual Report for 1962. Grading and 
paving 43 boat launching ramps and installation of 208 
picnic and camping units, 161 outdoor grills, 10 pittype 
and 4 flush-type toilets, and 4 picnic shelters were 
accomplished under program for provision of additional 
recreational facilities at completed projects to 
meet increased public use demands. Proposed additional 
recreational facility construction remains for 
accomplishment under project. Construction of Cordell 
Hull project started May 1963 under contracts for 
first-stage cofferdam and access roads to the damsite 
which are complete. Operations under continuing 
contract for lock and dam features, initiated in July 
1964, were completed in October 1966. Additional 
contracts have been completed for phase 1 reservoir 
clearing; channel dredging below lock; construction of 
warehouse and storage area; construction of secondstage 
powerhouse cofferdam; relocation of facilities of 
Tri-County Electric Membership Corp., South Central 
Bell Telephone Co., East Tennessee Natural Gas Co., 
and North Central Telephone Cooperative; Smith 
County road and bridge relocations; and Jackson 
County (first portion) road and bridge relocations. 
Status of work under other construction contracts 
follows: Relocation and adjustment of State of Tennessee 
highway facilities in reservoir area, 50 percent 
complete; Upper Cumberland' Electric Membership 
Corp. power lines, 75 percent; Twin Lakes Telephone 
Company telephone lines, 94 percent; and construction 
of power plant, 3 percent. Supply contracts were 
brought to the following percentages of completion: 
Turbines, 98 percent; generators, 91 percent; power 
transformers, 100 percent; 13.8-kv metal clad switchgear 
and miscellaneous equipment, 45 percent; draft 
tube gantry crane, 60 percent; and 70-ton gantry 
crane, 13 percent. Some preliminary work only has 
been performed under supply contracts awarded for: 
275-ton powerhouse crane; main control switchboards 
and appurtenant equipment; hydraulic governors; 
161-kv outdoor oil circuit breakers; 480-volt station 
service switchgear and transformers; carrier current 
coupling equipment; lightning arresters; transformers; 
disconnect switches and insulators; and carrier current 
transmitter-receiver equipment. Total land acquired, 
23,907 acres (23,690 in fee and 217 acres in easements), 
represent 87 percent of project requirements. Total 
new work costs for this section to June 30, 1970, were 
$97,083,266. Operation and maintenance of structures: 
Barkley, Cheatham, and Old Hickory locks were 
in operation at end of year; structures, channels, and 
appurtenances were maintained in serviceable condition. 
Total costs of existing project for entire stream 
were $310,450,933, of which $275,558,994 (including 
$685,000 from public works funds) were for new work 
and $34,891,989 for operation and maintenance. 
Surplus property valued at $81,527 was transferred 
from project without reimbursement. Benefits attributable 
to reduction of flood flows by the Barkley 
project to date amount to $2,368,000. Power revenues 
received to date: Barkley, $9,049,000; Cheatham, $8, 
535,000; and Old Hickory, $19,636,000. 
2. TENNESSEE RIVER, TENN., ALA., 
AND KY. 
Location. Formed by junction of French Broad and 
Holston Rivers in eastern Tennessee, 4.4 miles above 
Gay Street Bridge at Knoxville, flows southwest into 
northern Alabama, thence in a generally westerly 
course across north Alabama, to northeast boundary of 
Mississippi, thence nearly due north across Tennessee 
and Kentucky, entering Ohio River at Paducah, 652.1 
miles from junction of French Broad and Holston 
Rivers. (See Geological survey base map of Tennessee 
River Basin.) 
Previous projects. For details see pages 1902-1906, 
Annual Report for 1915; pages 1190-1194, 1196-1216, 
and 1220-1222, Annual Report for 1929; and page 
1216, Annual Report for 1938. 
Existing project. Originally provided for permanent 
improvement of river for a navigable depth of 9 feet at 
680

NASHVILLE, TENN., DISTRICT 
low water from mouth about 650 miles to Knoxville, 
Tenn., to be obtained by construction of low dams; 
provided, that under provisions of Federal Water 
Power Act a high day with locks may be substituted for 
any two or more low dams and built by private 
interests, States, or municipalities; and provided 
further, that in case high dams are built before the 
United States builds projected locks and low dams 
which are to be replaced, the United States shall 
contribute to cost of substituted structures in amount 
equal to estimated cost of work of navigation for which 
substitution is made. Appropriation of $5,000,000 for 
prosecution of above work on this project was authorized. 
Only construction performed by the Corps 
thereunder was construction of lock at General Joe 
Wheeler Dam and miscellaneous appurtenant improvements 
at a new work cost of $2,244,236. The 
Tennessee Valley Authority is authorized to construct 
such dams in Tennessee River as will provide a 9-foot 
channel and maintain a water supply for same from 
Knoxville to its mouth. Tennessee Valley Authority 
program provided for obtaining authorized 9-foot 
project by construction of high dams and locks and 
utilization of certain locks and dams previously 
constructed under jurisdiction of the Corps. Subsequent 
construction by that agency of Melton Hill 
Dam extends navigable channel of Tennessee River 
system up the Clinch River about 38 miles above 
damsite (mile 23.1) to vicinity of Clinton, Tenn. (See 
table 22-D on Tennessee River.) 
in accordance with general navigation laws placing 
control and supervision over navigable waters under 
direction of Secretary of the Army, Corps of Engineers 
operates and maintains all locks, and maintains 
navigation channels and safety harbors by performing 
all necessary maintenance dredging and snagging 
operations. For information concerning other functions 
of the Corps under division of responsibilities for 
Tennessee River since adoption of Tennessee Valley 
Authority Act of 1933, see page 1084 of Annual Report 
for 1962. 
Local cooperation. Authorization requires no local 
cooperation in construction of alternate system of low 
dams. It does, however, provide that if high dams are 
built before the United States builds projected locks 
and low dams which are to be replaced, the United 
States shall contribute to cost of substituted structures 
an amount equal to estimated cost of works of 
navigation for which substitution is made. 
Terminal facilities. Public-use river terminals with 
railroad connections are at Decatur and Guntersville, 
Ala., and Chattanooga and Knoxville, Tenn. River 
terminals with railroad connections, municipally 
owned, constructed at Sheffield, Ala., and Chattanooga, 
Tenn. river terminals without railroad 
connections, municipally owned, constructed near 
mouth of Big Sandy River and one mile above 
Pickwick Dam. State-owned public-use docks are at 
Whitesburg, Decatur, Bridgeport, and Florence, Ala. 
The other public terminals are mostly unimproved 
landings. Government-owned facilities for transfer of 
sulfur and toluene are at Volunteer Ordnance Works, 
Tyner, Tenn.; and for transfer of coal and salt at 
Redstone Arsenal, Green Grove, Ala., and at following 
Tennessee Valley Authority steam-electric powerplants 
along the river: Colbert, Wilson, and Widows 
Creek in Alabama, and Watts Bar, Kingston, and 
Johnsonville in Tennessee. Railroad inclines and 
sidings are available at Sheffield, Decatur, Hobbs 
Island, and Guntersville, Ala., and Chattanooga, 
Tenn. Privately-owned terminals constructed for 
transfer of certain commodities follows: Pulpwood at 
Courtland and Guntersville, Ala.; heavy metals and 
ores at Johnsonville, Tenn. and Scottsboro, Ala.; 
limestone at Grand Rivers, Ky., Bennetts Lake, and 
Chattanooga, Tenn.; pig iron and asphalt at Chattanooga, 
Tenn.; molasses and asphalt at Knoxville, 
Tenn.; miscellaneous merchandise at Guntersville, 
Ala.; coal at Calvert City and Grand Rivers, Ky., 
Florence, Decatur, and Guntersville, Ala.; grain at 
Florence, Decatur, and Guntersville, Ala., and Knoxville 
and Chattanooga, Tenn.; chemicals at Sheffield, 
Decatur, and Huntsville, Ala., Johnsonville and 
Chattanooga, Tenn., and Calvert City, Ky.; petroleum 
products at Sheffield, Decatur, and Guntersville, Ala., 
Reidland, Ky., and Perryville, Chattanooga, and 
Knoxville, Tenn.; and sand and gravel at Clifton, 
Johnsonville, Chattanooga, Knoxville, Perryville, 
Tenn., and Sheffield and Decatur, Ala. In addition to 
foregoing there are many unimproved private landings 
along river. Facilities are considered adequate for 
existing commerce. 
Operations and results during fiscalyear. Channel work by 
Government plant and hired labor consisted of 
dredging and snagging at various locations, dredging 
safety harbors and access channels, and maintenance 
and replacement of pile dolphins in safety harbors. 
Fleet work also included dredging of forebays and 
cleaning powerhouse trashracks, and dredging lock 
chambers and lower approaches. Cost of channel 
maintenance was $94,141. Operation and maintenance 
of structures: All locks were operated and lock 
appurtenances and standby plant maintained as 
required. Ordinary repairs, improvement, and reconstruction 
items included overhauling gate and valve 
operating machinery and revisions to control stands, 
fabrication of sectional aluminum valve bulkheads for 
Kentucky and Pickwick locks; repairs to valves at 
Wheeler (main) and Watts Bar locks waterproofing 
operations buildings at Watts Bar and Fort Loudoun 
locks; providing screens for handrails at Kentucky and 
Guntersville (auxiliary), locks; providing recess slot 
fillers for Wheeler (main and auxiliary), Guntersville 
(auxiliary), Chickamauga, Watts Bar, and Fort Loudoun 
locks; reinforcement of the upper gate anchorage 
recesses at Nickajack (auxiliary) and Chickamauga 
locks; fabrication of aluminum valve bulkheads for 
Chickamauga, Watts Bar, and Fort Loudoun locks; 
and underwater repairs to lower gate seal arrangement 
at Nickajack (auxiliary lock). The roof on the 
681

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
operations building at Watts Bar lock was replaced by 
contract. 
Condition at end of fiscal year. Existing project is 
complete. Construction was commenced January 1933 
and completed September 1944. Dredging canal and 
raising dam 1 and Hales Bar Dam remaining under 
Tennessee Valley Authority program to provide full 
project dimensions were completed by that agency in 
1948. Construction of additional and modified navigation 
features at Wilson project, to provide more 
efficient handling of increasing traffic past dam, was 
undertaken by Tennessee Valley Authority July 1956, 
and completed in fiscal year 1961. Plan of improvement 
included construction of a new single-lift 
lock, with larger chamber dimensions (110 by 600 feet) 
and affording additional lift; provision of auxiliary 
service, or standby lockage facilities, through alterations 
to existing double-lift lock; and, in conjunction 
with these features, realinement and deepening 
navigation canal immediately downstream to 
bypass and eliminate necessity for operation of lock 
and dam 1. Upon completion of new main lock, its 
operation was assumed by the Corps November 10, 
1959. Lock 1 was placed in inoperative status November 
23, 1959, with opening of relocated canal. 
Modified auxiliary lock was reopened to navigation 
February 9, 1961. Construction of a second, 110- by 
600-foot lock for increasing traffic capacity at Wheeler 
Dam was initiated in October 1960 and completed for 
commercial operation during fiscal year 1963. Work on 
multiple-purpose Melton Hill project was started in 
September 1960, navigation features of which also were 
completed during fiscal year 1963, adding about 46 
miles of 9-foot channel on Clinch River connecting 
with Watts Bar Reservoir on main stream. Construction 
of a second, 110- by 600-foot lock at 
Guntersville Dam was initiated in March 1963 and 
completed June 30, 1965. The Nickajack project, river 
mile 424.7, undertaken in March 1964 for replacement 
of Hales Bar Dam, was opened to navigation in 1967. 
Following locks were operated and maintained under 
permanent indefinite appropriation to end of fiscal 
year 1935; Hales Bar, since November 1, 1913; lock 
(and dam) 1, since March 1, 1926; Wilson, since June 
1, 1927; and Wheeler, since November 27, 1934. 
Subsequent to June 30, 1935, operation and maintenance 
of lock and dam 1 (to November 23, 1959), 
Hales Bar, (to September 10, 1968), Wilson (auxiliary). 
Wheeler (auxiliary), and Guntersville (auxiliary) locks 
have been carried on with funds appropriated for 
preservation and maintenance of river and harbors, as 
well as Pickwick Landing lock, since September 1, 
1937; Chickamauga lock, since October 15, 1937; 
Watts Bar lock, since March 3, 1941; Kentucky lock, 
since February 10, 1942; Fort Loudoun lock, since 
October 10, 1943; Wilson main lock since November 
10, 1959; Wheeler main lock since May 8, 1963; 
Melton Hill lock since June 10, 1963; Guntersville 
main lock sinceJune 30, 1965; and Nickajack auxiliary 
lock since 17 December, 1967. (See table 22-E for total 
cost of existing project toJune 30, 1970.) 
3. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 22-F. 
ALTERATION OF BRIDGES 
4. AUTHORIZED ALTERATION OF 
BRIDGES 
See table 22-G
FLOOD CONTROL 
5. CUMBERLAND, KY. 
Location. At Cumberland, Ky., on Poor Fork of 
Cumberland River about 23 miles above its confluence 
with Clover Fork near Harlan, Ky. 
Existing project. Provides for local flood protection at 
Cumberland, Ky., by enlargement of existing channel 
to a bottom width of 70-80 feet, beginning about 500 
feet above Whitesburg Road bridge, at mouth of 
Looney Creek, and extending downstream through 
town 6,830 feet to about 3,266 feet below junction of 
Cloverlick Creek. Lower reaches of channels of the two 
tributary creeks would be widened to a minimum of 36 
feet for 1,300 and 1,015 feet, respectively. Incidental 
work includes riprapping of channel cut slopes and 
banks, new bridge construction and pier modifications, 
strengthening certain existing retaining walls and 
building foundations, and relocations involving telephone 
and power lines, sewers, and water mains. 
Works are designed to provide a reasonable degree of 
protection, resulting in prevention of about 95 percent 
of experienced average annual flood losses. Project was 
authorized by 1950 Flood Control Act. Estimated cost 
of new work (July 1969) is $511,800 for construction, 
Federal; and $240,000 for lands and damages, non- 
Federal. 
Local cooperation. Project was originally planned for 
partial protection by channel clearing and cleaning, 
and carried in an inactive status following performance 
of major portion of work by local interests without 
expense to the Government. Recent study indicated 
economic feasibility of more extensive improvement as 
now contemplated, which can properly be done within 
discretionary authority of Chief of Engineers under 
existing project authorization. In accordance with this 
authorization, provisions of 1936 Flood Control Act as 
amended, apply; and local interests also shall prescribe 
and enforce regulations to prevent encroachment upon 
stream channel after construction of project. Assurances 
were furnished in form of a resolution of city 
council accompanying a letter of Mayor of Cumberland, 
Ky., dated September 7, 1962. Bond issue for 
financing city's share of project costs approved in 
regular general election November 5, 1963. City was 
furnished lands requirements and has developed 
preliminary ownership data. Local interests have 
reached an agreement with the State for required 
bridge construction under cost sharing arrangement. 
Further action has been deferred pending resolution of 
682

NASHVILLE, TENN., DISTRICT 
financial difficulty on part of city stemming from 
inability to sell the bond issue at prescribed interest 
rate. 
Operations and results during fiscal year. Administrative 
cost only incurred. 
Condition at end of fiscal year. Contract plans and 
specifications completed; construction awaits fulfillment 
of right-of-way requirements. 
6. EVARTS, KY. 
Location. Evarts, Harlan County, Ky., situated at the 
confluence of Yocum Creek with Clover Fork, Cumberland 
River, approximately 7 miles east of city of 
Harlan. 
Project. Provides for partial flood protection at Evarts 
through snagging and clearing and channel widening 
and deepening to uniform grade within 2-mile reach of 
Clover Fork, and snagging and clearing of tributary 
stream Yocum Creek, for a distance of 1.8 miles above 
its mouth. Construction was authorized by Chief of 
Engineers under authority of Section 208, 1954 Flood 
Control Act, Excavation of existing channel of Clover 
Fork to a minimum width of 50 feet would begin 
approximately 1,000 feet below the bridge at community 
of Kilday and extend some 10,950 feet 
upstream to a point 800 feet above the confluence of 
Bailey Creek. Incidental work involves removal of two 
abandoned bridge piers near lower limit of project. 
Estimated cost of new work (July 1970) is $37,600 for 
construction, Federal; and $1,200 for lands and 
damages, non-Federal. 
Local cooperation. Provisions of Flood Control Act of 
June 22, 1936, as amended, pertaining to ordinary 
conditions of cooperation with respect to lands and 
damages, and maintenance of works of improvement 
apply, and local interests also shall prescribe and 
enforce regulations to prevent encroachment upon 
improved stream channel. 
Operations and results during fiscal year. Project of 
modified scope as described above was approved July 
16, 1968 for construction under authority of 1954 Act 
in lieu of improvement of larger scope as originally 
contemplated under Section 205, Flood Control Act of 
1948, as amended; see 1968 Annual Report. At the 
request of local interests, the plan of improvements was 
further revised during the year to delete the proposed 
work in Yocum Creek. Administrative costs only were 
incurred during the year. 
Condition at end of fiscal year. No work has been 
undertaken pending assurances of local cooperation in 
modified project. 
7. MARTINS FORK LAKE, KY. 
Location. Dam planned at mile 14.8 on Martins Fork 
of Clover Fork, Cumberland River, about 8 miles 
southeast of city of Harlan, with reservoir extending 
about 5 miles upstream within Harlan County, 
southeastern Kentucky. 
Existing project. Project approved in general accordance 
with recommendations of House Document 
413, 86th Congress, by 1960 Flood Control Act, as 
amended by Public Law 88-253, was designed for 
purposes of flood control, power, and recreation as an 
integral unit of a coordinated plan for development of 
water resources of Cumberland River Basin. With the 
view of a net gain in power potential on a system basis, 
the plan of improvement incorporated appropriate 
flood control storage in the proposed project and 
corresponding adjustment in operations of Lake 
Cumberland (Wolf Creek Dam) for flood control and 
power, which in effect constituted a transfer of reservoir 
capacity without entailing a change in flood control 
benefits. Further detailed study giving full consideration 
to power capabilities and marketing arrangements 
indicated the advantage of maintaining 
present storage allocation at Wolf Creek and use of all 
available storage capacity of Laurel River Reservoir 
for power. As modified within discretionary authority 
of the Chief of Engineers, the project is now under 
construction in primary interests of power production 
and recreation, at an estimated cost of $34,600,000 
(July 1970). Dam will be rockfill type, about 1,420 feet 
long and about 282 feet above streambed. An uncontrolled 
spillway will be in a saddle on left bank 
about 400 feet from dam, consisting of an uncontrolled 
rock cut 750 feet long, discharging into an unlined 
lateral channel which will direct flows back into main 
stream some distance below project site. A powerhouse 
of conventional indoor-type, with an installation of 61, 
000 kilowatts in a single unit, is to be directly at 
downstream toe of dam. At top of power pool, spillway 
crest at elevation 1018.5 above mean sea level, reservoir 
will cover 6,060 acres. It will provide a total storage 
capacity of 435,600 acre-feet below elevation 1018.5, 
including active storage of 185,000 acre-feet within a 
drawdown range of 36.5 feet allocated for power 
production, and leaving a pool of at least 250,600 acrefeet 
at elevation 982, covering an area of 4,200 acres, 
available at all times for public use and conservation 
purposes. 
Local cooperation. None required. 
Operations and results during fiscal year. Work was 
initiated under contracts for Stage II Dam construction 
and supply of 1-98,000 hp hydraulic turbine. Hired 
labor operations included reservoir boundary line 
marking, preparation and issuance of plans and 
specifications for work contracted, and engineering 
and design on other project features. Acquisition action 
was completed on 414 acres. 
Condition at end of fiscalyear. Construction of right bank 
access road, initiated in December 1964, completed in 
August 1965. Contract for construction of diversion 
and power tunnels, started in April 1966, was completed 
in December 1967. Stage 1 Dam construction 
was initiated in April 1968 and completed in June 
1969. Stage II Dam construction commenced in 
August 1969 is about 11 percent complete. Preliminary 
work only was accomplished under supply contract for 
1-98,000 hp turbine. Lands acquired for project 
683

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
purposes total 556 acres. Project as a whole is about 30 
percent complete. 
8. MIDDLESBORO, CUMBERLAND 
RIVER BASIN, KY. 
Location. At Middlesboro, Ky., on Yellow Creek, a 
tributary entering Cumberland River about 660 miles 
above its mouth. 
Existing project. A system of canals and levees around 
one side of town, arranged so as to divert most 
headwaters of Yellow Creek away from present 
channel through heart of city. Protection is thus 
afforded, in large measure, to life and property within 
business district and a large part of residential section. 
For project details, see page 1088 of Annual Report for 
1962. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Levees, canals, and appurtenances were maintained by 
hired labor. Flood damages prevented during the year 
amounted to $3,341,000. 
Condition at end of fiscal year. New work under existing 
project was completed in March 1945. Construction of 
canal and levee system, initiated in May 1938, was 
completed and improvement placed in operation in 
December 1939. Relocation work was completed in 
September 1940. Flood damages prevented to date 
amount to $11,560,000. 
9. OHIO RIVER BASIN (NASHVILLE 
DIST.) 
Location. A series of levees, floodwalls, channel 
improvements, and reservoirs in Ohio River Basin 
within Nashville District. 
Existing project. The general comprehensive plans 
approved for flood control and other purposes in Ohio 
River Basin is set forth in legislation listed in Table 22- 
B. Individual projects, local protection projects and 
lakes, considered in comprehensive plan within Nashville 
District are listed in Table 22-H. 
10. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Flood Control Act of June 22, 1936, and subsequent 
acts, requires local interests furnish assurances they will 
maintain and operate certain local protection projects 
after completion in accordance with regulations 
prescribed by Secretary of the Army. District Engineers 
are responsible for administration of these regulations 
within their respective districts. Maintenance inspections 
were made during fiscal year of completed 
protective works in localities transferred to local 
interests for maintenance and operation. Local interests 
were advised, as necessary, of measures required 
to maintain projects in accordance with standards 
prescribed by regulations. Fiscal year cost was $6,104. 
Total cost to June 30, 1970 was $40,322. For project 
inspection data see table 22-I. 
11. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 22-J. 
12. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control and coastal emergencies (Public Law 99, 84th 
Cong., and antecedent legislation) 
Actual Federal costs for fiscal year were $30,829, of 
which $14,609 was for advance preparation (flood 
emergency manual revision), and $16,220 for flood 
emergency operations in Cumberland River Basin. 
Total costs to June 30, 1970 were $210,073. 
MULTIPLE-PURPOSE PROJECTS 
INCLUDING POWER 
13. CENTER HILL LAKE, OHIO RIVER 
BASIN, TENN. 
Location. Dam is on Caney Fork River, 26.6 miles 
above its confluence with Cumberland River (mile 
309.2) at Carthage, Tenn. It is in De Kalb County, 
Tenn., about 55 miles east of Nashville, and 14 miles 
southeast of Carthage, Tenn. Reservoir extends about 
64 miles up main stream and about 10 miles up Falling 
Water River and lies within De Kalb, Putnam, White, 
and Warren Counties, Tenn. 
Existing project. A combination earth and concrete 
gravity-type dam, hydroelectric powerplant, and 
reservoir for primary purposes of flood control and 
power production, with a permanent pool for public 
use and conservation purposes. In addition to main 
dam structure, provision was made for a rolled-earth 
dike to close a saddle in reservoir rim near damsite. For 
further details, see page 1099 of 1962 Annual Report. 
Estimated cost of project is $47,665,500 (July 1970). 
Local cooperation. None required on completed project; 
future recreation development subject to certain 
conditions of non-Federal cost-sharing under Federal 
Water Project Recreation Act of 1965. 
Operations and results during fiscal year. New work: 
Additional construction on recreational facilities by 
hired labor. Operation and maintenance: Dam was 
operated and structure and its appurtenances maintained 
as required. Operation of powerplant was 
continuous except for normal interruptions and necessary 
shutdowns for inspection and maintenance 
purposes. Total net energy generated (366,865,800 kwhr) 
was made available through Department of the 
Interior to Tennessee Valley Authority for distribution. 
Benefits attributable to reservoir effect in reduction of 
floodflows on Cumberland, lower Ohio and Mississippi 
Rivers estimated as $872,000. Activities under reservoir 
684

NASHVILLE, TENN., DISTRICT 
management program, comprising shoreline sanitation, 
malaria control, conservation, land management 
and disposal, and operation and maintenance 
of public-use facilities continued. 
Condition at end offiscalyear. Project was completed for 
full beneficial use April 1951. For chronology of 
construction and major items of work performed, see 
page 1101 of Annual Report for 1962. Flood damage 
reductions to date amount to $20,105,000. Power 
revenues total $20,673,973. 
14. DALE HOLLOW LAKE, OHIO RIVER 
BASIN, TENN. AND KY. 
Location Dam is on Obey River, 7.3 miles above its 
confluence with Cumberland River (mile 380.9) at 
Celina, Tenn. It is in Clay County, Tenn., and about 
80 miles northeast of Nashville, Tenn., 28 miles north 
of Cookeville, Tenn., and 3 miles east of Celina, Tenn. 
Reservoir extends about 51 miles up main stream, 10 
miles up East Fork, and 6 miles up West Fork of Obey 
River, and lies within Cumberland and Clinton 
Counties, Ky., and Clay, Pickett, Overton, and 
Fentress Counties, Tenn. 
Existing project. A concrete gravity-type dam, hydroelectric 
powerplant, and reservoir for primary 
purposes of flood control and power production with a 
permanent pool for public use and conservation 
purposes. See page 1096 of 1962 Annual Report for 
project details. Estimated cost of project is $28,105,400 
(July 1970). 
Local cooperation. None required on completed project, 
future recreation development subject to certain 
conditions of non-Federal cost-sharing under Federal 
Water Project Recreation Act of 1965. 
Operations and results during fiscal year. Operation and 
maintenance: Dam was operated and structure and its 
appurtenances maintained as required. Operation of 
powerplant was continuous except for normal interruptions 
and necessary shutdowns for inspection and 
maintenance purposes. Total net energy generated 
(107,459,222 kw-hr) was made available through 
Department of the Interior to Tennessee Valley 
Authority for distribution. Benefits attributable to 
reservoir effect in reduction of floodflows on Cumberland, 
lower Ohio and Mississippi Rivers estimated 
as $675,000. Activities under reservoir management 
program involved shoreline sanitation, malaria control, 
conservation, land management, and maintenance 
of public-use facilities. 
Condition at end offiscalyear. Project was commenced in 
March 1942 and completed for flood control operation 
in October 1943. Powerplant (initial 2-unit development) 
was completed April 1949 and third unit 
installed and placed in operation December 1953. For 
further details and information on other major items of 
work, see page 1098 of Annual Report for 1962. Flood 
damage reductions to date amount to $17,916,000. 
Power revenues total $14,845,038. 
451-584 0-72-44 
15. J. PERCY PRIEST DAM AND 
RESERVOIR, OHIO RIVER BASIN, 
TENN. 
Location. Damsite is on Stones River, 6.8 miles above 
its confluence with Cumberland River (mile 205.9); in 
Davidson County, Tenn.; and about 7 miles east of 
Nashville, Tenn. Reservoir extends southeasterly from 
dam about 32 miles along main stream, 10 miles up 
East Fork, 6.5 miles up West Fork, and for shorter 
distances up other tributaries of Stones River; and lie 
within Davidson, Rutherford, and Wilson Counties, 
Tenn. 
Existing project. Plan provided for construction of a 
combination earth and concrete gravity-type dam, 2, 
716 feet long and 130 feet above streambed, and a 
hydroelectric power generating plant. Dam consists of 
rolled earth embankment sections extending 680 and 1, 
372.5 feet, respectively, from right and left abutments, 
connected by a concrete structure 663.5 feet long, 
comprised of spillway and adjoining nonoverflow 
sections. Spillway, in flood plain adjacent to right bank 
of river channel, is surmounted with four tainter crest 
gates to provide for regulating and discharging 
floodflows. Powerhouse, a reinforced concrete structure 
of conventional indoor type, is at downstream base of 
nonoverflow section constructed across stream channel 
area, one 60-foot monolith of which is designed as an 
intake structure containing one 22-foot-diameter 
penstock. Power installation will consist of one generating 
unit of 28,000-kilowatt capacity. Project is a 
unit of a coordinated plan for flood control and 
development of water resources of Cumberland River 
Basin, this plan in turn forming an integral part of 
comprehensive plan of development for Ohio and 
Mississippi Rivers. At maximum controlled pool level, 
top of spillway crest gates, reservoir covers 22,720 acres 
and provides a storage capacity of 652,000 acre-feet, of 
which 350,000 is allocated for storage of winter floods 
and 34,000 as regulating storage for power, leaving a 
minimum pool of 268,000 acre-feet, 10,570 acres in 
extent, available for public use and conservation 
purposes. During summer season, pool is stabilized at a 
level affording 14,200 acres of water surface area for 
recreational use. Drainage area controlled is 892 
square miles or 95 percent of Stones River Basin. 
Project was selected for construction under general 
authorization for Ohio River Basin in 1938 Flood 
Control Act, and additional authorization in 1946 
River and Harbor Act. Estimated cost of project, 
including the one-unit power installation, is $51,625, 
000 (July 1970). 
Local cooperation. Recreation development subject to 
certain conditions of non-Federal cost-sharing under 
Federal Water Project Recreation Act of 1965. 
Operations and Results during fiscalyear. Operations were 
completed under contract for constructing powerplant 
and under supply contracts for the following: Gate 
hoist machinery and metal parts; control switchboard, 
15

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
supervisory control, and telemetering equipment; 13, 
800-4,160 volt substation and accessories. Work was 
also accomplished under contracts for construction of 
12 public-use areas, paving roadways and parking 
areas at 3 public-use areas, and installation of 4-inch 
water supply line at the project site. Construction of 
comfort stations, water treatment plants, picnic shelter, 
and sewerage improvements at 4 public-use areas was 
contracted prior to close of year, but not commenced. 
Hired labor activities included reservoir boundary line 
marking; equipment installations and minor construction 
items; and preparation of plans and specifications 
for work contracted. 
Operation and maintenance: Dam was operated 
and structures and appurtenances maintained as 
required. Benefits attributable to reservoir effect in 
reduction of flood flows on Cumberland, lower Ohio 
and Mississippi Rivers estimated as $531,000. The 
powerplant was placed in operation February 3, 1970. 
Total net energy generated (43,047,400 kw-hr) was 
made available through Department of the Interior to 
Tennessee Valley Authority for distribution. Activities 
under reservoir management program involved shoreline 
sanitation, malaria control, conservation, land 
management and maintenance of public-use facilities. 
Condition at end of fiscal year. Substructure, initiated in 
1963, was completed in 1968. Closure of dam was 
completed in December 1967, with project effective for 
flood control. Completion of the powerplant was 
accomplished during the year as were operations under 
all supply contracts. Recreation facility construction is 
about 60 percent complete. Total reservoir lands 
acquired, 34,103 acres (33,743 in fee and 360 in 
easement). Disposal action completed on 60 acres road 
easements. Project requirements will be fulfilled with 
transfer of 386 acres in fee and assignment of flowage 
rights over 229 acres programmed under interchange 
agreement with another Federal agency. Project as a 
whole is about 93 percent complete. Flood damage 
reductions to date amount to $594,000. Power revenues 
total $126,911. 
16. LAKE CUMBERLAND (WOLF CREEK 
DAM), OHIO RIVER BASIN, KY. 
Location. Wolf Creek Dam is on Cumberland River at 
mile 460.9 (above mouth) in Russell County, Ky., 
about 10 miles southwest of Jamestown and 12 miles 
north of Albany, Ky. Lake Cumberland extends 101 
miles up main stream, 48 miles up South Fork of 
Cumberland River, in Russell, Clinton, Wayne, 
Pulaski, McCreary, Laurel, and Whitley Counties, Ky. 
Existing project. A combination earth and concrete 
gravity-type dam, hydroelectric powerplant, and 
reservoir for primary purposes of flood control and 
power production, with a permanent pool for publicuse 
and conservation purposes. See page 1094 of 1962 
Annual Report for project details. Estimated cost of 
project is $80,394,100 (July 1970). 
Local cooperation. None required on completed project; 
future recreation development subject to certain 
conditions of non-Federal cost-sharing under Federal 
Water Project Recreation Act of 1965. 
Operations and results during fiscal year. New Work: 
Additional construction of recreational facilities by 
hired labor. Operation and maintenance: Dam was 
operated and structures and appurtenances maintained 
as required, including completion of foundation 
drilling and grouting for relief of drainage problem 
under embankment section. Operation of powerplant 
was continuous except for normal interruptions and 
necessary shutdowns for inspection and maintenance 
purposes. Total net energy generated (697,526,600 kwhr) 
was made available through Department of the 
Interior to Tennessee Valley Authority for distribution. 
Benefits attributable to reservoir effect reduction of 
floodflows on Cumberland, lower Ohio and Mississippi 
Rivers estimated as $1,820,000. Activities under 
reservoir management program involved shoreline 
sanitation, malaria control, land management, and 
maintenance of public-use facilities. 
Condition at end of fiscal year. Project commenced 
August 1941 and was completed for full beneficial use 
August 1952. For chronology of construction and major 
items of work performed see page 1095 of 1962 Annual 
Report. Flood damage reductions to date amount to 
$31,272,000. Power revenues total $35,640,372. 
17. LAUREL RIVER LAKE, KY. 
Location. Damsite is at mile 2.3 on Laurel River, a 
tributary of Cumberland River, in south-central 
Kentucky. The two streams meet about 9 miles below 
Cumberland Falls, a prominent physiographic feature 
at head of Lake Cumberland which is formed by Wolf 
Creek Dam. Reservoir will extend 19.2 miles upstream 
to site of Corbin, Ky., water-supply dam and lie within 
Laurel and Whitley Counties. 
18. OTHER AUTHORIZED MULTIPLEPURPOSE 
PROJECTS INCLUDING 
POWER 
(See table 22-K.) 
19. SURVEYS 
Fiscal year costs were $124,156, of which $118,007 
were for flood control studies and $6,149 for coordination 
with Soil Conservation Service on review of 
watershed studies. 
20. COLLECTION AND STUDY OF BASIC 
DATA 
Fiscal year costs were $44,808 for flood plain 
information studies, $6,728 for technical services to 
others, and $30,952 for flood plain management 
services, totalling $82,488. Flood plain studies completed 
and in progress are in table 22-L. 
686

NASHVILLE, TENN., DISTRICT 
21. RESEARCH AND DEVELOPMENT 
Fiscal year costs were $4,036 for miscellaneous 
hydrologic studies involving collection and processing 
of streamflow and rainfall data. 
Existing project. Multiple-purpose improvement combining 
flood control with water quality control and 
recreation development adopted by 1965 Flood Control 
Act (H. Doc. 244, 89th Cong.), in general 
accordance with recommendations. Dam will be 
earthfill type, about 730 feet long and rising 103 feet 
above streambed, with uncontrolled side-channel 
spillway 400 feet wide cut into rock. Outlet works 
provide for release of water from reservoir at varying 
levels. Drainage area above damsite is 56.1 square 
miles. At full pool level, spillway crest at elevation 1338 
above mean sea level, reservoir will cover 675 acres and 
contain 21,800 acre-feet of storage capacity. Provision 
is made for 18,100 acre-feet of reservoir capacity 
between elevations 1338 and 1300 for control of floods 
in winter and spring season, and 14,800 acre-feet (El. 
1338-1310) during summer and fall, in conjunction 
with which storage of 3,300 acre-feet would be 
available on a seasonal basis to meet streamflow 
requirements for water quality control and fish life 
below the dam. A minimum permanent pool of 3,700 
acre-feet, 270 acres in extent, will thus be provided 
during potential flood seasons; and during late spring 
and summer when flood storage can be reduced, the 
lake is to be operated generally at a higher level (El. 
1310) to maintain a larger surface area of 380 acres for 
recreation and to provide the required seasonal storage 
for releases of water during critical low-flow periods. 
Project will prevent major portion of average annual 
flood losses at Harlan and result in significant stage 
reductions with related benefits along rural reaches 
and at other urban areas downstream. Estimated cost 
of project, including planned initial recreation development, 
is $6,600,000 (July 1970), of which $325, 
000 is subject to reimbursement by local interests. 
Local cooperation. Federal Water Project Recreation 
Act of 1965 applies with regard to non-Federal 
participation in recreation development, in addition to 
which local interests are to provide certain safeguards 
to ensure functioning of reservoir as intended. Presently 
estimated cost to non-Federal interests for participation 
in provisions for recreation as now envisioned for 
reasonably complete development of that purpose is 
$498,000 for construction, and $35,000 annually for 
operation, maintenance, and major replacements 
related to the recreation function. Annual costs of $23, 
000 and reimbursement of $325,000 in project first 
costs allocated to recreation and fish and wildlife 
enhancement are estimated as representing non-Federal 
responsibility based on planned level of initial 
development for these purposes. Flexibility in size and 
responsibility of recreation development is accorded 
under Recreation Act, depending upon intentions of 
non-Federal interests to cooperate; project authorization 
also provides that required local participation 
in the recreational feature may be modified 
to conform with standards established pursuant to 
studies by Appalachian Regional Commission. 
Operations and results during fiscalyear. Engineering and 
design continued. 
Condition at end of fiscal year. Preconstruction planning 
65 percent complete. 
687

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 22-A 
See 
Section 
in Text Project Funding 
1. Cumberland River, New Work 
Tenn. and Ky.' Approp. 
Cost 
Maint. 
Approp. 
Cost 
2. Tennessee River, New Work 
Tenn., Ala. and Ky. s Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
5. Cumberland, Ky. New Work 
Approp. 
Cost 
6. Evarts, Harlan New Work 
County, Ky. Approp. 
Cost 
7. Martins Fork Lake, New Work 
Ky. Approp. 
Cost 
8. Middlesboro, New Work 
Cumberland River Approp. 
Basin, Ky. Cost 
Maint. 
Approp. 
Cost 
13. Center Hill Lake, New Work 
Ohio River Basin, Approp. 
Tenn. Cost 
Maint. 
Approp. 
Cost 
14. Dale Hollow Lake, New Work 
Ohio River Basin, Approp. 
Tenn. & Ky. Cost 
Maint. 
Approp. 
Cost 
15. J. Percy Priest Dam New Work 
and Reservoir, Tenn. Approp. 
Cost 
Maint. 
Approp. 
Cost 
16. Wolf Creek Dam and New Work 
Lake Cumberland, Approp. 
Ohio River Basin, Ky. Cost 
Maint. 
Approp. 
Cost 
17. Laurel River Lake, New Work 
Ky. Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
$ 8,929,000 
9,040,296 
2,378,462 
2,183,644 
$8,429,000 
8,544,880 
2,254,300 
2,502,287 
1,573,738 1,455,057 
1,673,399 1,626,832 
8,719 - 
-7,890 -11,000 
5,128 2,644 
42 
14,110 
94,000 
15,372 
235,900 
28,752 
45,000 
46,770 
526,700 
513,661 
71,000 
66,071 
505,900 
493,338 
9,534,000 
10,068,896 
50,500 
34,299 
125,000 
44,149 
661,400 
612,100 
2,400,000 
2,767,754 
7,997 
205,000 
73,960 
76,500 
299,982 
150,000 
66,373 
523,900 
534,491 
65,000 
45,285 
551,700 
525,557 
4,900,000 
5,340,855 
86,500 
99,437 
56,000 
112,922 
1,799,508 
1,401,848 
970,000 
989,082 
$9,679,000 
6,044,984 
2,756,000 
2,691,471 
1,822,000 
1,746,242 
842 
319 
37,576 
2,374 
-5,000 
66,810 
20,900 
24,477 
350,000 
3,442 
673,800 
635,901 
25,000 
52,424 
656,700 
662,756 
4,753,000 
2,449,916 
234,000 
223,269 
23,000 
37,995 
2,415,400 
2,670,581 
2,300,000 
2,116,944 
$6,972,000 
7,584,716 
3,314,432 
3,263,920 
1,579,578 
1,577,442 
107 
636 
300,000 
75,391 
13,029 
11,525 
437,000 
93,858 
951,209 
877,795 
78,000 
39,386 
638,047 
658,484 
2,161,000 
1,824,033 
505,506 
478,096 
34,000 
7,797 
1,550,568 
1,608,170 
2,690,000 
2,638,233 
$281,018,938 
276,385,197 
38,376,770 
38,158,6954 
16,251,428 
16,251,428 
33,381,151 
33,284,8286 
400,000 
400,000 
511,9527 
66,231 
74,5428 
37,602 
594,0009 
231,533 
817,830 10 
817,830 
520,444 
518,916 
12 
45,711,75412 
44,919,58413 
7,545,749 
7,402,67014 
26,392,1831s 
26,334,761 
7,582,727 
7,543,211 
18 51,625,435 
47,918,158 
876,506 
835,10120 
79,672,36321 
79,635,0502 
12,154,014223 
11,995,87324 
10,913,000 
10,112,89725 
688

NASHVILLE, TENN., DISTRICT 
COST AND FINANCIAL STATEMENT 
1. Includes $9,707,354 for abandoned and/or replaced 
works under the old Cumberland River system. (Amount 
includes $826,253 for new work and $3,266,706 for maintenance 
on previous projects. 
2. Includes $956,000 placed in FY 1970 reserve for allocation 
in FY 1971 and $61,733 public works acceleration funds. 
3. Includes $61,733 public works acceleration funds. In 
addition, surplus property valued at $72,498 transferred from 
project without reimbursement. 
4. In addition, surplus property valued at $9,029 transferred 
from project without reimbursement. 
5. Includes $14,007,193 for new work and $4,005,175 for 
maintenance on previous projects. 
6. In addition, surplus property valued at $108,007 transferred 
from project without reimbursement. 
7. Includes $417,000 placed in FY 1970 reserve for allocation 
in FY 1971. 
8. Includes $36,966 expended under authority of Section 
205, Flood Control Act of 1948, as amended. 
9. Includes $300,000 placed in FY 1970 reserve for allocation 
in FY 1971. 
10. Includes $38,876 Emergency Relief Funds. 
11. In addition, surplus property valued at $4 transferred to 
project without reimbursement. 
12. Includes $35,896 public works acceleration funds. Also, 
includes $757,000 placed in FY 1970 reserve for allocation in 
FY 1971. 
13. Includes $35,896 public works acceleration funds. In 
addition surplus property valued at $55,528 transferred to 
project without reimbursement. 
14. In addition, surplus property valued at $8,378 transferred 
to project without reimbursement. 
15. Includes $25,000 placed in FY 1970 reserve for allocation 
in FY 1971 and $51,789 public works acceleration funds. 
16. Includes $51,789 public works acceleration funds. In 
addition, surplus property valued at $28,223 transferred to 
project without reimbursement. 
17. In addition, surplus property valued at $14,635 transferred 
to project without reimbursement. 
18. Includes $1,228,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
19. In addition, surplus property valued at $1,042 transferred 
to project without reimbursement. 
20. In addition, surplus property valued at $9,192 transferred 
to project without reimbursement. 
21. Includes $30,000 placed in FY 1970 reserve for allocation 
in FY 1971 and $96,920 public works acceleration funds. 
22. Includes $96,920 public works acceleration funds. In 
addition, surplus property valued at $46,438 transferred to 
project without reimbursement. 
23. Includes $82,048 public works acceleration funds. 
24. Includes $82,048 public works acceleration funds. In 
addition, surplus property valued at $35,462 transferred from 
project without reimbursement. 
25. In addition, surplus property valued at $2,894 transferred 
to project without reimbursement. 
689 
TABLE 22-A (Continued)

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 22-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
CUMBERLAND RIVER BELOW NASHVILLE 
July 13, 1892 
June 25, 1910 
August 30, 1935 
July 24, 1946 
June 19, 1952 
September 3, 1954 
July 14, 1960 
August 5, 1886 
March 2, 1907 
March 2, 1919 
June 5, 1920 
July 3, 1930 
June 26, 19342 
July 24, 1946 
July 3, 1930 
May 18, 1933 
August 28, 1937 
June 28, 1938 
August 18, 1941 
December 22, 1944 
July 24, 1946 
Provision made for lock A 
Provision made for locks B to F, and for dredging below lock F. 
Repairing dams A to F, inclusive, and surmounting same with 
movable crests. 
Provision of 9-foot channel by the construction of 3 moderate 
height dams below Nashville; via, Kuttawa (Eureka), Dover, and 
Cheatham. 
Provision for hydroelectric power production as a function of 
Cheatham Dam. 
Construction of Barkley (Lower Cumberland) dam and reservoir 
project for navigation, flood control, hydroelectric power, 
and related purposes in lieu of Kuttawa and Dover 
navigation-only structures. 
Authorized change in alignment of Illinois Central Railroad. 
CUMBERLAND RIVER ABOVE NASHVILLE 
Provision made for locks and dams; the Secretary of War to 
determine the final plan of improvement. 
Dimensions of the locks fixed in accordance with reports of 
Mar. 30, 1887, and Nov. 25, 1890. 
Adoption of the report of the Board of Engineers, dated 
Feb. 26, 1906, limiting the lock and dam construction to locks 
and dams 1 to 7, and 21. 
Provision made for locks and dams 8 to 17 
Authorizes work to proceed in Tennessee without waiting for 
action of local interests in Kentucky. 
Raising dam 1, 3 feet 
Operation and care of locks and dams provided for with funds 
from War Department appropriations for rivers and harbors. 
Construction of Old Hickory, Cordell Hull (Carthage), and 
Celina Dams above Nashville for navigation and the 
development of power resources. 
TENNESSEE RIVER 
Authorized navigable depth of 9 feet from mouth about 650 
miles to Knoxville, Tennessee to be obtained by construction 
of low dams. 
Authorized TVA to construct such dams in the Tennessee River 
as will provide a 9 foot channel. 
OHIO RIVER BASIN, NASHVILLE DISTRICT 
Construct levees, floodwalls, and drainage structures for 
protection of cities and towns in Ohio River Basin. Project 
to be selected by Chief of Engineers with approval of 
Secretary of War at a cost not to exceed $24,877,000 for 
construction. 
Approved general comprehensive plan for flood control and 
other purposes in Ohio River Basin as may be advisable in 
discretion of Secretary of War and Chief of Engineers, and 
for initiation and partial accomplishment of plan, 
authorized $75 million for reservoirs and $50,300, for local 
flood protection works. 
Additional $45 million for prosecution of comprehensive plan 
for Ohio River Basin. 
Additional $70 million for further prosecution of 
comprehensive plan for Ohio River Basin. 
Additional $125 million for further prosecution of 
comprehensive plan. 
Annual Report, 1890, p. 2 1 5 1 
H. Docs. 758, 60th Cong., 1st 
sess.; and 1481, 60th Cong., 2d 
sess. 
H. Doc. 38, 73d Cong., 1st sess. 
H. Doc. 761, 79th Cong., 2d sess. 
S. Doc. 81, 83d Cong., 2d sess. 
H. Doc. 56, 86th Cong., 2d sess. 
Annual Report 1884, p. 1663. 
Annual Report 1888, p. 1622, and 
Annual Report 1892, p. 1933. 
H. Doc. 699, 59th Cong., 1st sess. 
Rivers and Harbors Committee Doc. 
10, 63d Cong., 2d sess. 
Rivers and Harbors Committee Doc. 
26, 70th Cong., 2d sess. 
H. Doc. 761, 79th Cong., 2d sess. 
H. Doc. 328, 71st Cong., 2d sess. 
Flood Control Committee Doc. 1, 
75th Cong., 1st Sess. 
Flood Control Committee Doc. 1, 
75th Cong., 1st Sess. 
H. Doc. 762, 77th Cong., 2nd sess. 
H. Doc. 506, 78th Cong., 1st Sess. 
690

TABLE 22-B (Conti 
Acts 
May 17, 1950 
December 30, 1963 
June 18, 1965 
August 13, 1968 
June 19, 1970 
NASHVILLE, TENN., DISTRICT 
inued) AUTHORIZING LEGISLATION 
Work Authorized 
Additional $100 million for prosecution of comprehensive plan 
for Ohio River Basin. 
Additional $150 million for further prosecution of comprehensive 
plan for flood control and other purposes in Ohio River 
Basin. 
Additional $89 million for further prosecution of 
comprehensive plan for Ohio River Basin. 
Additional $35 million for further prosecution of comprehensive 
plan for Ohio River Basin. 
Additional $69 million for further prosecution of comprehensive 
plan for Ohio River Basin. 
Documents 
H. Doc. 6755, 89th Cong., 1st 
Sess. 
S. 3710, 90th Cong., 2d Sess. 
H. R. 15166 91st Cong., 2d Sess. 
1. Contains latest published maps. Included in Public Works 
Administration program Sept. 6, 1933. 
2. Permanent Appropriation Repeal Act. 
691 
c

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
CUMBERLAND RIVER, TENN. AND KY.: PRINCIPAL FEATURES 
(See Section 1 of Text) 
Dam and Reservoir Barkley Cheatham Old Hickory Cordell Hull Celina 
Nearest town Kuttawa, Ky., Ashland City, Old Hickory, Carthage, Tenn., Celina, Tenn., 
Miles above mouth of river 
Lock dimensions (feet) 1 
Lift at normal pool levels 
(feet) 
Depths on guardsills at 
normal pool levels (feet) 
Character of foundations 
Dam: 
Type 
Height 
Length, exclusive of 
lock section (feet) 
Spillway: 
Gross length (feet) 
Net length 
opening (feet) 
Crest gates: 
Type 
Number 
Size (feet) 
Operating levels at dam 
(feet, mean sea level): 
Maximum regulated 
Normal operation: 
Full pool 
Minimum pool 
Minimum pool in advance 
of floods 
Reservoir area (acres) 
Reservoir capacity 
(acre-feet): 
Flood control 
Power drawdown 
Dead storage 
Total 
Canal: 
Length (miles) 
Bottom width (feet) 
Depth at minimum 
pool level (feet) 
Power development: 
Number of units 
Generator rating 
(kilowatts) 
Total installation 
(kilowatts) 
Tenn., 9 miles. 
148.7 
110 by 800 
26 
17 upper; 
17 lower 
Rock 
Concrete gravity 
75 
800 
480 
420 
Tainter 
7
60 by 27 
11 miles. 
30.6 
110 by 800 
57 
24 upper; 
13 lower 
Rock 
Concrete gravity 
and earthfill 
157 
9,959 
804 
660 
Tainter 
12 
55 by 50 
442 
27,450 
125,000 s 
63,000 
357,000 
545,000 
25,000 
100,000 
Tenn., 3 miles. 
216.2 
84 by 400 
60 
17 upper; 
13 lower 
Rock 
Concrete gravity 
and earthfill 
98 
3,6052 
325 
270 
Tainter 
6
45 by 41 
4503 
499 
13,920 
85,6005 ,6 
20,500 
204,800 
310,900 
33,333 
100,000 
5 miles. 
385.4 
5 miles. 
313.5 
84 by 400 
59 
19 upper; 
16 lower 
Rock 
Concrete gravity 
and earthfill 
93 
1,1382 
291 
225 
Tainter 
5
45 by 41 
5083 
508 
501 
23,000 
69,000 
692 
TABLE 22-C 
Rock 
Concrete gravity 
and earthfill 
86 
2,298 
290 
250 
Tainter 
5
50 by 37 
5553 
550 
549 
13,150 
59,000 s 
10,000 
179,000 
248,000 
375 
359 
354 
385 
382 
346 
93,430 
1,213,0003'4 
259,000 
610,000 
2,082,000 
7,450 
19,8007 
84,200 
104,000 
1.75 
400 
11 
32,500 
130,000 
12,000 
36,000

NASHVILLE, TENN., DISTRICT 
TABLE 22-C (Continued) CUMBERLAND RIVER, TENN. AND KY.: PRINCIPAL FEATURES 
(See Section 1 of Text) 
Dam and Reservoir Barkley Cheatham Old Hickory Cordell Hull Celina 
Percent of project completion 8 8 8 60 
Year opened to navigation 19649 1952 1954 
Estimated cost $144,634,700 $31,123,900 $53,135,100 $71,700,000 $39,100,000 
1. Clear width and length available for full width. 
2. Exclusive of lock section. 
3. Surcharge. 
4. Normal operation (elev. 375-359) during nonflood season; 
flood control allowance to be increased to 1,472,000 
acre-feet (elev. 375-354) during season of major floodflows. 
5. Surcharge storage. 
6. During flood season (elev. 508-501); minimum 51,800 
acre-feet (elev. 508-504) with normal operation during non-flood 
season. 
7. Daily pondage allowance; run-of-river project. 
8. Completed for full beneficial use. 
9. Temporary operation of lock only. 
693

TABLE 22-D TENNESSEE RIVER 
(See Section 2 of Text) 
Lock Dimensions 
LengthM iles WLiidftth Minimum Depth Year 
Project Above Miles from Nearest Town of able for on Guard Sills Character Opened Kind Type of 
Mouth Cha- Full Nor- axof Foundation to Navi- of Dam Construction an 
Mouth Cham- Full Nor- Maxi- gation and Dam 
ber Width mal mum Lower Upper 
(feet) (feet) (feet) (feet) (feet) (feet) 
Kentucky 22.4 0.5 above Gilbertsville, 110 600 56 73.3 12.7 11.0 Limestone 1942 Fixed Concrete and 
Ky. earthfill 
Pickwick Landing 206.7 4.4 above Hamburg, 110 600 55 63.0 12.8 10.0 Limestone 1937 Fixed Concrete and 
Tenn. earthfill 
Wilson: 
Auxiliary lock 259.4 2.9 above Florence, 60 292 94 100.0 11.0 4 11.2 Limestone 1927 Fixed Concrete and $46,973,5405 
Ala. 300 earthfill 
Main lock 259.4 2.9 above Florence, 110 600 94 100.0 13.0 13.0 Limestone 1959 - - 
Ala. 
General Joe Wheeler: 
Auxiliary lock 274.9 18.4 above Florence, 60 400 48 51.5 13.2 14.7 Limestone 1934 Fixed Concrete and 1,796,2956 
Ala. earthfill 
Main lock 274.9 18.4 above Florence, 110 600 48 51.5 13.0 13.0 Limestone 1963 Fixed Concrete and 
Ala. earthfill 
Guntersville: 
Auxiliary lock 349.0 9.1 below Guntersville, 60 360 39 45.0 11.8 13.0 Limestone 1937 Fixed - & 7 
Ala. 
Main lock 349.0 9.1 below Guntersville, 110 600 39 45.0 12.7 13.0 Limestone 1965 Fixed Concrete and 
Ala. earthfill 
Nickajack: 
Auxiliary lock 424.7 39.4 below Chatta- 110 600 39 41.0 13.0 13.0 Limestone 1967 Fixed Concrete 
nooga, Tenn. 
Main lock 424.7 39.4 below Chatta- 110 800 39 41.0 13.0 13.0 Limestone Fixed Concrete 
nooga, Tenn. 
Chickamauga 471.0 6.9 above Chatta- 60 360 49 53.0 13.8 10.0 Limestone 1939 Fixed - 
nooga, Tenn. 
Watts Bar 529.9 6.8 above Breedenton, 60 360 58 70.0 11.8 12.0 Shale 1941 Fixed Concrete and 
Tenn. earthfill 
Fort Loudon 602.3 1.3 above Lenoir City, 60 360 72 80.0 11.8 12.0 Limestone 1943 Fixed Concrete and 
Tenn. earthfill 
Melton Hill 23.1 22.1 above Kingston, 75 400 54 60.0 13.0 13.0 Limestone 1963 Fixed Concrete 2 
(Clinch R.) Tenn. 
i1. so DrH, , 32 71t , 2o( d - rti bl... 9n ..a no .......i. ... i. 4. Tailwater in canal: flight of 2 locks. n. ioc. aO, I oiogt nL ., zU sess., contansll tablUe, pp. u an 7, givi nn etLIIIIL 
information concerning low dams contemplated under 1930 project. Annual Report for 
1938, pp. 1218 and 1219, contains similar information pertaining to low dams in addition 
to existing locks and dams, including those constructed or under construction by 
Tennessee Valley Authority. 
2. Lock and dam constructed by Tennessee Valley Authority. 
3. Lock and dam constructed by Tennessee Valley Authority. Design for lock prepared 
with Corps forces and funds. 
5. Constructed by the Corps under authority of sec. 124, National Defense Act of 
June 3, 1916 (H. Doc. 1262, 64th Cong., 1st sess.). Actual cost of lock and dam. 
6. Actual cost of lock only as constructed by the Corps; dam constructed by 
Tennessee Valley Authority. 
7. Constructed by Tennessee Valley Authority. 
C
0
it 
x
0
Crl 
rJ) 
J) 
0

NASHVILLE, TENN., DISTRICT 
TABLE 22-E TOTAL COST OF EXISTING PROJECTS TO JUNE 30, 1970 
(See Section 2 of Text) 
Operation 
Channel & 
Project Funds New Work Maintenance Maintenance Total 
Tennessee River, Regular $2,244,236 $3,570,173 $25,709,480 $31,523,889' 
Tenn, Ala., and Maintenance and - - 11,665 11,665 
Ky. operation 
Increase of compensation, - 5 - 5 
rivers and harbors, 
1919 (certified claims) 
Total $2,244,236 $3,570,178 $25,721,145 $31,535,5591 
1. In addition, surplus property valued at $4,552 was 
transferred to the project without reimbursement. Excludes 
$2,889,149 expended between 1890 and June 30, 1935, on 
operation and care of works of improvement under provisions of 
appropriation for such purposes. 
TABLE 22-F OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 3 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Name of Project Report for Construction Maintenance 
Caney Fork River, Tenn. 1 1895 27,828 
Clinch River, Tenn., and Va. 2 '3 1923 53,949 7,873 
Duck River, Tenn.1,4 1887 13,000 
Elk River, Ala. and Tenn. 1'4 1904 4,000 
French Broad and Little Pigeon Rivers, Tenn.2 '5 1931 249,605 33,554 
Hiwassee River, Tenn. 2 ,4 1923 113,311 9,754 
Holston River, Tenn.1,'4 1911 5,714 
Little Tennessee River, Tenn.1 1888 5,510 
Obey River, Tenn.1 1887 11,500 
Red River, Tenn.1 1884 5,000 
South Fork of Cumberland River, Ky.1 1892 11,967 
1. Completed. 4. Recommended for abandonment in H. Doc. 467, 69th 
2. Inactive. Cong., 1st Sess. 
3. Recommended for abandonment in H. Doc. 532, 64th 5. Recommended for abandonment in H. Doc. 428 and 489, 
Cong., 1st Sess. 64th Cong., 1st Sess. 
TABLE 22-G OTHER AUTHORIZED ALTERATION OF BRIDGES 
(See Section 4 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Name of Project Report for Construction Maintenance 
Woodland Street Bridge, Cumberland River at 
Nashville, Tenn.1 1967 $987,632 
1. Completed. 
695

TABLE 22-H 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OHIO RIVER BASIN (NASHVILLE DISTRICT) 
(See Section 9 of Text) 
LOCAL PROTECTION PROJECTS 
Type Location of Estimated Cost Protection Protection Federal Non-Federal Total 
Middlesboro (Yellow Creek), Levees $1,080,000 $240,000 $1,320,0002 
Ky.' 
RESERVOIRS 
Total 
Tributary Basin and Reservoir Stream Estimated 
Cost 
Center Hill, Tenn.3 Caney Fork River $47,665,500 
Dale Hollow, Tenn. and Ky.3 Obey River 28,105,400 
J. Perry Priest, Tenn. 3 '4 Stones River 51,625,000 
Lake Cumberland, Ky.3 '6 Cumberland River 80,394,100 
Rossview, Tenn. and Ky. 1,s Red River 12,590,0002 
Three Islands, Tenn.7 Harpeth River 19,900,0002 
1. See "Other authorized flood control projects." 5. Inactive. 
2. Last revised in 1958. 6. Formerly Wolf Creek Reservoir. 
3. Details of this project are in individual report. 7. See "Other authorized multiple-purpose projects includ- 
4. Formerly Stewarts Ferry Reservoir. ing power." 
TABLE 22-I INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 10 of Text) 
Project Date of Inspection 
Barbourville, Ky. Oct. 1969 and May 1970 
Corbin, Ky. Oct. 1969 and May 1970 
Lake City, Tenn. Oct. 1969 and May 1970 
Paint Rock River, Ala. Dec. 1969 and May 1970 
Pineville, Ky. Oct. 1969 and May 1970 
Spring City, Tenn. Oct. 1969 and Apr 1970 
TABLE 22-J OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 11 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Barbourville, Ky.4 
1963 2,088,147 
Chattanooga, Tenn. and Rossville, Ga. 1 1949 180,997 - 
Coal Creek and tributaries (Lake City), Tenn.4 1962 460,134 
Corbin (Lynn Camp Creek), Ky. 1969 567,703 
Middlesboro (Yellow Creek), Ky.2 1949 26,309 
Paint Rock River, Ala.4 
1967 544,173 
Pineville, Ky.4 
1963 1,669,176 5- 
Rossview Reservoir, Ohio River Basin, Tenn. 
and Ky.3 
6,779 
1. Authorization expired Dec. 31, 1953 (Public Law 314, 
82d Cong) 
2. Deferred for restudy. 
3. Inactive. 
4. Completed. 
5. Exclusive of $9,950 contributed funds. 
696

NASHVILLE, TENN., DISTRICT 
TABLE 22-K OTHER AUTHORIZED MULTIPLE-PURPOSE PROJECTS INCLUDING POWER 
(See Section 18 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Barkley Dam and Lake Barkley, Ky. and Tenn. 1 
- 142,865,825 5,098,569 
Celina Dam, Ky.1 ,4 - 208,0182 
Cheatham lock and dam, Tenn.1' 3 30,489,352 7,351,337 
Cordell Hull lock and dam, Tenn. - 43,363,995 
Old Hickory lock and dam, Tenn. 1,'3 49,750,653 8,430,427 
Three Islands Reservoir, Ohio River Basin, 
Tenn.4 
111,8552 
1. Details given under "Cumberland River, Tenn. and Ky." 3. Completed for beneficial use. 
2. Engineering and design. 4. Deferred for restudy. 
TABLE 22-L FLOOD PLAIN STUDIES COMPLETED AND IN PROGRESS 
(See Section 20 of Text) 
Date Federal 
Location Requesting Agency Complete Cost 
Ashland City, Tenn. City of Ashland City, Tenn. June 1970 $8,460 
Carthage, Tenn. City of Carthage, Tenn. Apr. 1967 21,409 
Celina, Tenn. City of Celina, Tenn. Dec. 1968 14,010 
Clarksville, Tenn. City of Clarksville, Tenn. July 1964 24,156 
Franklin, Tenn. City of Franklin, Tenn. Nov. 1968 10,685 
Gainesboro, Tenn. City of Gainesboro, Tenn. Mar. 1968 12,286 
Harlan, Ky. City of Harlan, Ky. Sep. 1969 21,009 
Middlesboro, Ky. City of Middlesboro, Ky. - 23,899' 
Murfreesboro, Tenn. City of Murfreesboro, Tenn. Mar. 1966 17,433 
Sparta, Tenn. City of Sparta, Tenn. - 3,9981 
Williamsburg, Ky. City of Williamsburg, Ky. Mar. 1969 12,419 
Woodbury, Tenn. City of Woodbury, Tenn. - 11,1191 
1. Cost to June 30, 1970 
697

LOUISVILLE, KY., DISTRICT* 
This district comprises a portion of southwestern 
Ohio, west central Kentucky, a small portion of north 
central Tennessee, Indiana except northern part, and 
southeastern Illinois except Cairo-Mounds-Mound 
City area, all included in drainage basin of Ohio River 
and its tributaries (exclusive of Tennessee and Cumberland 
Rivers) from mile 438 (below Pittsburgh) 
immediately upstream from Foster, Ky., to mouth. 
IMPROVEMENTS 
Navigation 
1. Construction of Locks and Dams, Ohio 
R iver .............................. ...... ........... 
2. Green and Barren Rivers, Ky. ............... 
3. Kentucky River, Ky .............................. 
4. Ohio River, open-channel work ............ 
5. Other authorized navigation projects .... 
6. Navigation work under special 
authorization .................... ......... 
Flood Control 
7. Barren River Lake, Ky ......................... 
8. Big Pine Lake, Ind ................................ 
9. Big Walnut Lake, Ind ........................... 
10. Booneville Lake, Ky .............................. 
11. Brookville Lake, Ind .............................. 
12. Buckhorn Lake, Ky. ............................... 
13. Caesar Creek Lake, Ohio ..................... 
14. Cagles Mill Lake, Ind ............................. 
15. Carr Fork Lake, Ky. .......................... 
16. Cave Run Lake, Ky .............................. 
17. Clarence J. Brown Dam & Reservoir, 
Ohio ............. ........................ 
18. Clifty Creek Lake, Ind .......................... 
19. Dayton, Ky. ....................................... 
20. Eagle Creek Lake, Ky .......................... 
21. East Fork Lake, Ohio ............................ 
22. England Pond Levee, Ill ....................... 
23. Evansville, Ind ........................................ 
24. Falmouth Lake, Ky ............................... 
25. Frankfort, Ky. (N. Frankfort Area) ...... 
26. Greenfield Bayou Levee, Ind. ................. 
27. Green River Lake, Ky .......................... 
28. Huntington Lake, Ind ........................... 
29. Indianapolis, Ind ..................................... 
30. Island Levee, Ind ................................... 
31. Lafayette Lake, Ind ............................... 
32. Levee Unit No. 1, Wabash River, Ill. .. 
33. Levee Unit No. 5, Wabash River, Ind. 
Page 
700 
700 
700 
701 
701 
34. 
35. 
36. 
37. 
38. 
39. 
701 40. 
41. 
42. 
43. 
701 
701 
770022 46. 
770022 48. 
702 
770033 50. 
703 51. 
704 
704 
704 
705 
705 
705 
705 
706 
706 
706 
707 
707 
707 
708 
708 
708 
709 
709 
52. 
53. 
54. 
55. 
56. 
57. 
58. 
59. 
60. 
61. 
62. 
63. 
64. 
65. 
66. 
Flood Control (cont.) Page 
Lincoln Lake, Ill. ................. 709 
Louisville, Ky. ................. ....................... 710 
Louisville Lake, Ill. .................................. 710 
Mansfield Lake, Ind. .................. 710 
Mason J. Niblack Levee, Wabash 
River, Ind. ........................................ 711 
Mill Creek, Jefferson County, Ky ....... 711 
Mississinewa Lake, Ind ...................... 711 
Monroe Lake, Ind ............................ 711 
Morehead, Triplett Creek, Ky. ............ 712 
Mt. Carmel, Ill ............... ............ 712 
Nolin River Lake, Ky. ...................... 712 
Ohio River Basin (Louisville Dist.) ...... 712 
Orleans, Ind . .................... ................... 713 
Panther Creek, Ky. .................................. 713 
Patoka Lake, Ind. ................................... 713 
Red River Lake, Ky. .............................. 714 
Rochester and McCleary's Bluff Levee, 
Ill ............ ....................... ........ 714 
Rough River Lake and Channel 
Improvement, Ky .................... 714 
Salamonie Lake, Ind ........................ 714 
Saline River and Tributaries, Ill. ....... 715 
Southwestern Jefferson County, Ky. ...... 715 
Sturgis, Ky ..................... ... ................ 715 
Taylorsville Lake, Ky ....................... 716 
Tri-Pond Levee, Wabash River, Ill. ..... 716 
Wabash River Basin .......................... 716 
West Fork of Mill Creek Lake, Ohio .. 716 
West Terre Haute, Ind. ....................... 717 
Inspection of completed flood control 
projects .............................................. 717 
Other authorized flood control projects 717 
Flood control work under special 
authorization .......... .......................... 717 
General Investigations 
Surveys ......................... ......................... 717 
Collection and study of basic data ....... 717 
Research and development .................... 717 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
699

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
NAVIGATION 
1. CONSTRUCTION OF LOCKS AND 
DAMS, OHIO RIVER 
For report on this improvement see this heading 
under Ohio River. 
2. GREEN AND BARREN RIVERS, KY. 
Location. Green River rises in Casey County, Ky., 
flows northwesterly 370 miles, and empties into Ohio 
River about 8 miles above Evansville, Ind. Barren 
River rises in Monroe County, Ky., flows northwesterly 
130 miles, and empties into Green River one-half mile 
above lock 4 and 149.5 miles above mouth of Green 
River. 
Existing project. Six locks and dams on Green River 
and one on Barren River to give, with channel work in 
pools of dams, a navigable depth of 9 feet and width of 
200 feet from Ohio River to mile 103 Green River, 3.2 
miles upstream from Paradise, Ky.; a navigable depth 
of 5.5 feet from mile 103 Green River to 
Fluctuations in stage vary considerably at different 
locks. At lock 3, Green River, ordinary high stages are 
from 12 to 15 feet above pool level, and at lock 1, 
Barren River, from 7 to 10 feet above pool. Maximum 
stages of record are 34 feet above normal pool stage at 
lock 3, Green River, and 29 feet at lock 1, Barren 
River, obtained during floods of 1937 and 1913, 
respectively. (See table 23-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Considered adequate for existing 
commerce. (See table 23-D on terminal facilities.) 
Operations and results during fiscal year. Consisted of 
operation and maintenance of locks and dams, 1 to 3, 
Green River, maintenance of lock 4, Green River and 
lock and dam 1, Barren River, and removal of shoals, 
snags, and slides as required to maintain adequate 
channel for existing traffic between mouth of Green 
River and dam 4 at mile 149, Green River. 
Condition at end offiscalyear. Lock 1 and Lock and dam 
2, Green River, and lock and dam 1, Barren River, 
were in good condition. Reconstruction of Dam 1, 
Green River, was started in January 1970 and 
advanced to 7 percent complete for the fiscal year at a 
cost of $57,146. poor condition. Dam 4, Green River, 
failed May 24, 1965, when 120 feet washed out. Breach 
has later widened, and repairs are deferred pending 
completion of survey report for navigation on Green 
River. Pool of dam 1, Barren River, is maintained for 
local small boat use, but navigation through lock is 
suspended because of loss of lower pool. Operation of 
locks 5 and 6, Green River, was discontinued August 
1951, as they were no longer used by river traffic. 
Controlling project depth in lower 103 miles of Green 
River is 9 feet; controlling depth from mile 103 to 
Bowling Green, Ky. is 5.5 feet. Under permit issued by 
District Engineer on August 20, 1963, private interests 
dredged channel of Green River to extend 9-foot depth 
to coal loading terminal at mile 105.7. Channel of 
Green River from mouth of Barren River at mile 149.5 
to Mammoth Cave, Ky., at mile 197.8, is no longer 
maintained and is blocked by deactivated locks and 
dams 5 and 6. 
3. KENTUCKY RIVER, KY. 
Location. Formed by confluence of its North and 
Middle Forks about 4 miles east of Beattyville in east 
central Kentucky, (South Fork joining the main stream 
at that place), flows northwesterly and empties into 
Ohio River at Carrollton, Ky., mile 545.8 below 
Pittsburgh, Pa. (See Geological Survey Chart for State 
of Kentucky; scale 1:500,000.) 
Existing project. Provides for 14 locks and fixed dams 
to give, in connection with improvement of Ohio River, 
slack water navigation of 6 feet minimum depth from 
Ohio River to points on the three forks a short distance 
above Beattyville, Ky. Length of 6-foot-depth project 
on main system of Kentucky River is 258.6 miles to 
confluence of Middle and North Forks. Cost of 
completed new work is $4,176,749. River frequently 
rises to 35 feet high or more. Extreme height at lock 1 
due to flood backwater from Ohio River is 60.3 feet, 
while extreme floods reach height of 47.6 feet at lock 4, 
and 35.5 feet at lock 14. At some intermediate locks 
extreme height of floods exceeds 40 feet. All flood 
heights refer to upper pool gages. Existing project was 
adopted by 1879 River and Harbor Act (H. Ex. Doc. 
47, 45th Cong., 3d sess., and Annual Report, 1879, p. 
1398). Operation and care of locks and dams were 
included in project July 1, 1935, under provisions of 
Permanent Appropriations Repeal Act of June 26, 
1934. 
Licenses. Federal Power Commission license No. 539, 
to Kentucky Utilities Co., at dam 7, Kentucky River, 
Annual charge, $4,708; total collections through fiscal 
year 1970, $192,401. 
Terminal facilities. Facilities for bulk commodities and 
gasoline are at various points and considered adequate 
for existing traffic. List appears on page 1110, Annual 
Report for 1962. (See table 23-E on locks and dams, 
Kentucky River, Ky.) 
700

LOUISVILLE, KY., DISTRICT 
Operations and results during fiscal year. Regular funds: 
Operation and maintenance of the 14 locks and dams, 
and removal of shoals, snags, and slides as required to 
maintain an adequate channel for existing traffic 
between mouth of river and Beattyville, Ky. in pool of 
dam No. 14. Rehabilitation: Completed minor structural 
rehabilitation work, details in Annual Reports for 
1963, 1964, and 1965. Installation of sewage treatment 
facilities at Locks and Dam 12, 13 and 14 was started in 
June 1970. 
Condition at end of fiscal year. Existing project was 
completed in 1917. Work accomplished was rehabilitation 
of the five old State locks and dams and 
construction of new locks and dams 6 to 14 inclusive. 
Canalization system of Kentucky River is in poor 
condition. Repairs were made to deteriorated locks and 
dams as required to keep locks in operation and 
maintain pool levels above dams except in extreme dry 
weather, when some pools fall below normal levels. 
Channel work was performed as required to relieve 
critical hardship conditions for existing river traffic. 
Controlling navigable depth in section covered by 
existing project was 6 feet at end of fiscal year. 
4. OHIO RIVER, OPEN-CHANNEL WORK 
For report on this improvement see this heading 
under Ohio River. 
5. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 23-K at end of chapter. 
6. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION Navigation 
activities pursuant to section 107, Public Law 86-645 
(preauthorization) 
Fiscal year costs were $5,935. The detailed project 
report for navigation on Green and Barren Rivers is 75 
percent complete. Detailed project report for small 
boat harbor at Cairo, Ill. has been revised for 
consideraton of alternate site proposed by local 
interests and is 90 percent complete. 
FLOOD CONTROL 
7. BARREN RIVER LAKE, KY. 
Location. Dam is on Barren River, 79.5 miles above its 
confluence with Green River and 10 miles northeast of 
Scottsville, Ky. At flood control pool, reservoir extends 
upstream about 40 miles in Barren and Allen Counties, 
Ky. 
Existing project. A reservoir for flood control and allied 
purposes. Dam is rolled earth and rock fill, 146 feet 
high and 3,970 feet long, with gate-controlled outlet 
works and uncontrolled open-cut spillway. Total 
storage capacity is 815,200 acre-feet (768,600 for flood 
control and 46,600 for water supply storage). For 
451-584 0-72-45 
further details see page 1125 of Annual Report for 
1962. Estimated cost of new work (1970) is $28,604,500 
including $3,573,000 for construction of recreation 
facilities under the completed project program. Project 
was authorized by Flood Control Act of 1938. 
Local cooperation. None required by authorizing act. 
Under provision of Water Supply Act of 1958, contract 
with city of Glasgow for water supply storage was 
approved by Secretary of Army on October 4, 1965. 
Terms require city to pay $23,433, which is project cost 
allocated to water storage plus capitalized prepayment 
of proportionate share of operation, maintenance, and 
major replacement costs. 
Operation and results during fiscal year. New work: 
Installation of potable water system was advanced to 
50 percent complete. Maintenance: Routine maintenance 
was performed. Operation for flood control 
during 1970 flood season prevented damages of $860, 
000. 
Condition at end of fiscal year. Construction started in 
March 1960 and all major construction and relocation 
items have been completed. Reservoir was completed 
October 1964 though placed in operation in March 
1964. Land acquisition completed except for final 
judgements on condemnation of mineral interests. 
8. BIG PINE LAKE, IND. 
Location. Damsite is in Warren County, Ind., 2.5 
miles above mouth of Big Pine Creek, a tributary of 
Wabash River, and is about 2 miles northwest of Attica 
and 21 miles southwesterly from Lafayette, Ind. 
Existing project. A reservoir for flood control and allied 
purposes. Dam will be concrete and earthfill, 132 feet 
high and 4,620 feet long, with gate-controlled concrete 
gravity spillway and gated sluices. Total storage 
capacity will be 210,500 acre-feet of which 201,500 feet 
will be for flood control (winter months). Estimated 
cost of new work (1970) is $24,567,000, of which $23, 
400,000 is Federal cost and $1,167,000 non-Federal 
contribution. Project was authorized by 1965 Flood 
Control Act. 
Local cooperation. Local interests must agree to 
administer project land and water areas for recreation 
and fish and wildlife enhancement; pay, contribute in 
kind, or repay with interest (which may be through 
user fees) one-half of separable costs allocated to 
recreation and fish and wildlife enhancement; bear all 
costs of operation, maintenance, and replacement of 
recreation and fish and wildlife lands and facilities. 
Local interests must also agree to prevent encroachments 
on channel between dam and mouth of 
Big Pine Creek. State of Indiana has indicated intent to 
fulfill requirements. 
Operations and results during fiscal year. Preconstruction 
engineering and design studies continued. 
Condition at end of year. Preconstruction planning is 46 
percent complete overall. Design Memoranda for 
701

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Hydrology & Hydraulics and Site Selection, are 
complete. General Design Memorandum is 35 percent 
complete. 
9. BIG WALNUT LAKE, IND. 
Location. Damsite is on Big Walnut Creek, a tributary 
of the Eel River 25.9 miles above the mouth of Big 
Walnut Creek and 4 miles northeast of Greencastle, 
Indiana. 
Existing project. A reservoir for flood control and allied 
purposes. Dam will be earth fill 130 feet high and 15, 
300 feet long with uncontrolled open cut spillway and 
gate controlled outlet works. Total storage capacity 
will be 323,400 acre feet of which 160,700 feet is 
allocated for flood control. Estimated cost of new work 
(1970) is $25,200,000 Federal and $15,664,000 non- 
Federal. Project was authorized by 1968 Flood Control 
Act. 
Local cooperation. Local interest must agree to administer 
project land and water areas for recreation 
and fish and wildlife enhancement: pay, contribute in 
kind, or repay with interest (which may be through 
user fees) one-half of separable costs allocated to 
recreation and fish and wildlife enhancement; bear all 
costs of operation, maintenance, and replacement of 
recreation and fish and wildlife lands and facilities. 
Local interests must agree to prevent encroachments 
on channel between dam and mouth of Big Walnut 
Creek and Eel Rivers. 
Operations and results during fiscal year. Special study on 
impact of project on natural values in upper regions of 
reservoir was started. 
Condition at end of fiscal year. Special study is about 5 
percent complete. 
10. BOONEVILLE LAKE, KY. 
Location. Damsite is on South Fork of Kentucky 
River, 16.9 miles above confluence with and 271.6 
miles above mouth of Kentucky River. Reservoir will 
be in Clay and Owsley Counties, Ky., about 130 air 
miles southeast of Louisville. 
Existing project. A reservoir for flood control and allied 
purposes. Dam will be earthfill, 165 feet high and 1,200 
feet long, with gate-controlled outlet works and gated 
open-cut spillway. Total storage capacity will be 318, 
000 acre-feet, of which 302,000 acre-feet will be for 
flood control. Estimated (1970) Federal cost of new 
work is $34,200,000. Project was authorized by Flood 
Control Acts of June 28, 1938, and December 22, 1944. 
Local cooperation. None required. 
Operations and results during fiscal year. Preconstruction 
engineering and design studies continued. 
Condition at end offiscalyear. General design memo 35% 
complete. Hydrology and Hydraulics design memorandum 
complete. Project Formulation design memorandum 
is 75% complete. 
11. BROOKVILLE RESERVOIR, IND. 
Location. Damsite is on East Fork of Whitewater 
River, 2.4 miles above confluence with West Fork, and 
about 1 1/2 miles north of Brookville, Ind. 
Existing project. A reservoir for flood control and allied 
purposes. Dam will be earthfill, 182 feet high and 3,004 
feet long, with gate-controlled outlet works, and 
uncontrolled open spillway. Total storage capacity will 
be 359,600 acre-feet (214,700 for flood control, 89,300 
for water supply and 35,500 for conservation). A 
minimum pool of 20,100 acre-feet will be maintained. 
Estimated cost of new work (1970) is $46,596,000 of 
which $28,900,000 is Federal cost and $7,675,000 is 
non-Federal contribution for water supply storage and 
$10,021,000 for construction of recreation facilities 
under the completed project program. Project was 
authorized by 1938 Flood Control Act. 
Local cooperation. None required by authorizing act. 
Contract with State of Indiana for water supply storage 
under provisions of Water Supply Act of 1958 was 
approved by Secretary of Army August 5, 1965. Under 
terms of contract, State will pay initial costs allocated 
to water supply feature of project plus capitalized 
prepayment of proportionate share of operation and 
maintenance costs. 
Operations and results during fiscal year. Engineering 
studies continued. Acquired 42 tracts of land. Completed 
33% relocation Indiana Highway 101, Site S-1; 
completed contract for relocation Fayette-Union 
REMC facilities as required for Highway 101 relocation; 
completed Gulf Refining Co. Pipeline relocation. 
Awarded in March 1970 and completed 1% of 
contract for Dam. 
Condition at end of fiscal year. Engineering studies 
continued. 424 tracts of land of estimated 444 required 
for project have been acquired. Relocation of Indiana 
Highway 101, Site S-1 is 91% complete. Construction 
of Dam is 1% complete. 
12. BUCKHORN LAKE, KY. 
Location. Dam is on Middle Fork of Kentucky River, 
43.4 miles above mouth, and 0.5 mile upstream from 
Buckhorn, Perry County, Ky. Reservoir extends 
upstream about 34 miles and lies in Leslie and Perry 
Counties, Ky. 
Existing project. A reservoir for flood control and 
recreation. Dam is earth and rockfill type, with gate 
controlled outlet works. Total storage capacity is 168, 
000 acre-feet, of which 157,600 acre-feet is for flood 
control. For further details, see page 1120 of Annual 
Report for 1962. Estimated cost of new work (1970) is 
$12,428,800 including $1,038,100 for construction of 
recreation facilities under the completed project 
program. Existing project was authorized by general 
authorization for Ohio River Basin in 1938 Flood 
Control Act. 
702

LOUISVILLE, KY., DISTRICT 
Local cooperation. Department of Parks of Commonwealth 
of Kentucky has undertaken management 
of lands and recreational facilities in accordance with 
license granted by Secretary of the Army on June 29, 
1962. 
Operations and results during fiscal year. Engineering 
study to determine necessity of raising a portion of 
State Highway and construction of connecting roads to 
relieve impaired access due to extended flooding of 
highways is 99 percent complete. Construction of two 
well water systems at recreation sites completed. 
Routine maintenance was performed. Operation for 
flood control during 1970 flood season prevented 
damages estimated at $928,500. 
Condition at end of fiscal year. Construction began 
September 1956 and reservoir was placed in operation 
in August 1960. All major construction and relocation 
items have been completed, and land acquisition is 
complete except for some mineral interests. 
13. CAESAR CREEK LAKE, OHIO 
Location. Damsite is on Caesar Creek, about 3.0 miles 
above its confluence with Little Miami River, in 
Warren County, Ohio, about 3.5 miles southeast of 
Waynesville, Ohio, and 10.5 miles northeast of 
Lebanon, Ohio. Reservoir will be in Warren, Clinton, 
and Green Counties, Ohio. 
Existing project. Provides for construction of a reservoir 
for flood control and allied purposes. It includes an 
earth and rock fill dam, a saddle dam, outlet works and 
an uncontrolled saddle spillway. Total storage capacity 
of reservoir will be 242,200 acre-feet, of which 148,500 
acre-feet would be reserved for flood control storage. 
Estimated cost of new work (1970) is $35,911,000 
including $5,411,000 for construction of recreation 
facilities under the completed project program. Existing 
project was authorized by general authorization 
for Ohio River Basin in 1938 Flood Control Act. 
Local cooperation. None required. However, the State 
of Ohio requested inclusion in the project of storage for 
future municipal and industrial water supply uses. 
Contract with State of Ohio for water supply storage 
under provisions of Water Supply Act of 1958, as 
amended, was approved by Secretary of the Army May 
20, 1970. Under terms of contract, State will reimburse 
the Federal Government for costs allocated to water 
supply storage over a period not to exceed 50 years after 
use of this storage is initiated plus estimated annual 
amount for cost of operation, maintenance and major 
capital replacements required for the water supply 
facilities. 
Operation and results during fiscal year. Engineering and 
design studies continued. Acquired 126 tracts of land. 
Completed contract for real estate mapping, which 
includes Boundary Line Marking. 
Condition at end of fiscal year. Design memorandum for 
outlet works is complete. Design memorandum for dam 
is complete. Design memorandum utility relocations is 
100 percent complete. Design memorandum recreation 
facilities is 35 percent complete. Plans and specifications 
for saddle dams and Warren Co. Road 
relocation are complete. Design memorandum real 
estate 80 percent complete. 179 tracts of land of 
estimated 376 required for project have been acquired. 
Construction has not started. 
14. CAGLES MILL LAKE, IND. 
Location. Dam is on Mill Creek, 2.8 miles above its 
confluence with Eel River, in Putnam County, Ind., 
and about 25 miles east of Terre Haute, Ind. Reservoir 
extends upstream about 11 miles and is in Putnam and 
Owen Counties, Ind. 
Existing project. A reservoir for flood control and 
recreation. Dam is earth and rockfill embankment. 
Total storage capacity is 228,100 acre-feet, of which 
201,000 acre-feet are for flood control. For details see 
Annual Report for 1962, page 1136. Estimated cost of 
new work (1970) is $4,255,800 including $148,000 for 
construction of recreation facilities under the completed 
project program. Existing project was selected 
for construction under general authorization for Ohio 
River Basin in 1938 Flood Control Act. 
Local cooperation. None required. State of Indiana has 
undertaken development and management of recreation 
facilities for use of the public in reservoir area in 
accordance with license granted by Secretary of the 
Army on January 17, 1952. 
Operations and results during fiscal year. New work: 
None. Maintenance: Routine operations and maintenance 
performed. Project was operated for flood 
control during 1970 flood season and prevented 
damages estimated at $1,076,700. 
Condition at end of fiscal year. Construction of project 
was started in July 1948 and completed in fiscal year 
1953. 
15. CARR FORK LAKE, KY. 
Location. Damsite is 8.8 miles above mouth of Carr 
Fork, a tributary of North Fork of Kentucky River, 16 
miles upstream from Hazard, Ky. 
Existing project. Provides for construction of a reservoir 
for flood control and allied purposes. Dam will be rock 
and earth fill with impervious core, 720 feet long and 
130 feet high, with uncontrolled open cut spillway 
through left abutment. Outlet works will have two 
control gates and 8-foot diameter conduit to stilling 
basin. Total storage capacity will be 47,700 acre-feet 
(31,660 for flood control and 4,330 for water quality 
control). A higher level seasonal pool for recreation will 
be provided. Estimated Federal cost of new work 
(1970) is $30,800,000. Project was authorized by 1962 
Flood Control Act. 
Local cooperation. None required for reservoir project. 
Division of Flood Control and Water Usage of 
Commonwealth of Kentucky gave assurance that 
703

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
encroachments on downstream channel capacity will 
be prevented. 
Operations and results during fiscalyear. Engineering and 
design Studies and land acquisition continued. Construction 
contracts for relocation of Kentucky Highway 
15, Parts 1 and 2, were advanced to 96 percent and 
61 percent of completion, respectively. Fiscal year costs 
were $683,240 for Part 1 and $2,643,698 for Part 2. 
Relocation of cemeteries was advanced to 93 percent 
completion at a cost of $48,296 for fiscal year. 
Condition at end of fiscal year. Construction of outlet 
works complete. Land acquisition is 66 percent 
complete. Relocation of Kentucky Highway 15, Parts 1 
and 2, is 74 percent complete. Relocation of cemeteries 
is 93 percent complete. Engineering and design is well 
advanced for elements of project not yet under 
construction. Project is about 49 percent complete 
overall. 
16. CAVE RUN LAKE, KY. 
Location. Damsite is on Licking River, about 4 miles 
upstream from U.S. Highway 60 near Farmers, Ky., 
and 7 miles southwest of Morehead, Ky. Reservoir will 
be in Rowan, Bath, Morgan, and Menifee Counties, 
Ky. 
Existing project. Plan provides for construction of a 
reservoir for flood control and allied purposes. Dam 
will be rolled earthfill, with gate controlled outlet 
works and uncontrolled open spillway. Total storage 
capacity will be 614,100 acre-feet (438,500 for flood 
control and 28,300 for water quality control). Estimated 
Federal cost of new work (1970) is $42,047,000 
of which $3,647,000 is U.S. Forest Service cost. Project 
was authorized by Flood Control Acts of June 22, 1936, 
and June 28, 1938. 
Local cooperation. None required. 
Operations and results during fiscalyear. Engineering and 
design studies continued. Land acquisition was continued 
at fiscal year cost of $1,389,515. Relocation of 
Kentucky Highways 1274, Part 1 and 801, Part 1, were 
completed at fiscal year costs of $556,453 and $138,135, 
respectively. Relocation of Highway 801, Part 2, was 
begun and advanced to 18 percent completion at a cost 
of $388,670. Construction of dam and spillway was 
started and brought to 16 percent completion at cost of 
$1,115,594. 
Condition at end of fiscal year. Outlet works and 
relocated State Highways 801, Part 1, and 1274, Part 1, 
are complete. Land acquisition is about 70 percent 
complete. Engineering and design is well advanced for 
elements of project not yet under construction. Project 
is about 36 percent complete overall. 
17. CLARENCE J. BROWN DAM & 
RESERVOIR, OHIO 
Location. Damsite is just east of Springfield, Clark 
County, Ohio, at mile 7.3 of Buck Creek, a tributary of 
Mad River. 
Existing project. Plan provides for construction of a 
reservoir for flood control and allied purposes. It 
includes an earthfill dam, 6,620 feet long and 72 feet 
high, with gated outlet works and open cut spillway 
through right abutment with concrete chute. Total 
storage capacity of reservoir will be 63,700 acre-feet 
(32,900 for flood control and 20,800 for water quality 
control). Estimated Federal cost of new work (1970) is 
$19,200,000. Project was authorized by 1962 Flood 
Control Act. 
Local cooperation. Local interests must provide assurances 
against detrimental channel encroachment 
below dam to mouth of Buck Creek. Assurances from 
city of Springfield, Springfield Conservancy District, 
and Clark County, Ohio, were accepted March 5, 
1964. 
Operations and results during fiscal year. Engineering and 
design studies continued. Plans and specifications for 
Croft Road relocation were completed. Plans and 
specifications for the Dam and Spillway and Railroad 
Roadbed construction were advanced to 85 and 98 
percent complete, respectively. Design Memorandum, 
Public Use Plan, Site Plans, is 98 percent complete. 
Land acquisition was continued at fiscal year cost of $1, 
033,400. 
Condition at end of fiscal year. Outlet works are 
completed. Land acquisition is about 71 percent 
complete. Project is about 34 percent complete overall. 
18. CLIFTY CREEK LAKE, IND. 
Location. The dam site is 1.5 miles southwest of 
Hartsville, Ind., 18.4 miles about mouth of Clifty 
Creek, tributary of East Fork of White River, and is 12 
miles northeast of Columbus, Ind. and 37 miles 
southeast of Indianapolis, Ind. Lake area lies in 
Bartholomew and Decatur Counties. 
Existing project. A reservoir for flood control and allied 
purposes. Dam will be concrete and earth fill, 88 feet 
high and 7,000 feet long, with a gate-controlled 
overflow spillway in the concrete section of the dam 
and two gate controlled sluices in the base of the dam. 
Total storage capacity will be 56,200 acre-feet, of 
which 48,550 acre-feet will be for flood control (winter 
months). Estimated cost of new work (1970) is $21,268, 
000 of which $20,000,000 is Federal cost and $1,268, 
000 is non-Federal contribution. Project was authorized 
by 1965 Flood Control Act. 
Local cooperation. Local interests must agree to 
administer project land and water areas for recreation 
and fish and wildlife enhancement; pay, contribute in 
kind, or repay (which may be through user fees) with 
interest one-half the separate costs allocated to rec- 
704

LOUISVILLE, KY., DISTRICT 
reation and fish and wildlife enhancement; bear all 
costs of operation, maintenance, and replacement of 
recreation and fish and wildlife lands and facilities. 
Local interests must also agree to prevent encroachments 
on channel below dam on Clifty Creek 
and East Fork of White River to mouth of Muscatatuck 
River. State of Indiana has indicated intent to fulfill 
requirements. 
Operations and results during fiscal year. Preconstruction 
Engineering and design studies continued. Draft of 
design memorandum, Site Selection, was completed. 
General Design Memorandum advanced to 50 percent 
complete. Design Memoranda, Project Formulation 
and Concrete Aggregates and Stone Protection Sources 
are 50 and 20 percent complete, respectively. 
Condition at end of fiscal year. Aerial survey and 
mapping is completed. Design Memoranda for Hydrology 
and Hydraulics and Draft of Site Selection are 
complete. 
19. DAYTON, KY. 
Location. In Campbell County, Ky on left bank of 
Ohio River from mile 467.0 to mile 469.2 and across 
the river from Cincinnati, Ohio. 
Existing project. Provides for construction of 8,290 feet 
of levee, two pumping stations with gravity drainage 
structures and major relocations of storm and sanitary 
sewers serving the community. Estimated cost of new 
work (1970) is $4,130,000 Federal and $1,736,000 non- 
Federal. 
Local Cooperation. Section 3 of the Flood Control Act 
of 22 June 1936 applies. Preliminary assurances of 
cooperation were received from City of Dayton, 
Kentucky on May 3, 1966. 
Operations and results during fiscal year. General design 
memorandum was completed. 
Condition at end of fiscal year. Construction has not 
started. 
20. EAGLE CREEK LAKE, KY. 
Location. Damsite is 38.5 miles above mouth of Eagle 
Creek, tributary of Kentucky River, and about 44 
miles north of Frankfort, Ky. Reservoir will lie in 
Grant and Owen Counties. 
Existing project. Provides for construction of a reservoir 
for flood control and allied purposes. Dam will be earth 
and rockfill, 128 feet high and 1,650 feet long. Outlet 
works will be slide gate controlled, and spillway will be 
uncontrolled open cut. Storage capacity will be 207, 
700 acre-feet of which 193,200 acre-feet will be for 
flood control. Estimated cost of new work (1970) is $28, 
600,000. Project was authorized by Flood Control Act 
of 1962. 
Local cooperation. None required for reservoir project. 
Kentucky Division of Flood Control and Water Usage 
gave assurance that downstream channel encroachments 
will be prevented. 
Operation and results during fiscal year. Preconstruction 
engineering and design studies continued. General 
design memorandum (revised) is 97 percent complete. 
Design Memorandum, Land Requirements Plan, 
Public Use, is 20 percent complete. 
Condition at end of fiscal year. Construction has not 
started. 
21. EAST FORK LAKE, OHIO 
Location. Damsite is on East Fork of Little Miami 
River between Batavia and Williamsburg, Ohio, about 
6.0 miles above Batavia and 32.6 miles above mouth of 
the Little Miami River. Entire project lies in Clermont 
County, Ohio. 
Existing project. Provides for construction of a reservoir 
for flood control and allied purposes. It includes an 
earthfill dam, outlet works, an uncontrolled saddle 
spillway and a dike to close a saddle north of spillway. 
Total storage capacity of reservoir will be 294,800 acrefeet, 
of which 210,600 acre-feet will be reserved for 
flood control storage. Estimated cost of new work 
(1970) is $46,395,000, including $6,895,000 for construction 
of recreation facilities under the completed 
project program. Existing project was authorized by 
general authorization for Ohio River Basin in 1938 
Flood Control Act. 
Local cooperation. None required. However, the State 
of Ohio requested inclusion in the project of storage for 
future municipal and industrial water supply uses. 
Contract with State of Ohio for water supply storage 
under provisions of Water Supply Act of 1958, as 
amended, was approved by Secretary of the Army May 
20, 1970. Under terms of contract, State will reimburse 
the Federal Government for costs allocated to water 
supply storage over a period not to exceed 50 years after 
use of this storage is initiated plus estimated annual 
amount for cost of operation, maintenance and major 
capital replacements required for the water supply 
facilities. 
Operations and results during fiscal year. Engineering 
studies continued. Acquired 96 tracts of land. Awarded 
in May 1970 and completed 1% of contract for Dam. 
Condition at end of fiscal year. Engineering studies 
continued. 198 tracts of land of estimated 363 required 
for project have been acquired. Construction of dam is 
1% complete. 
22. ENGLAND POND LEVEE, ILL. 
Location. In Lawrence County, Ill., on right banks of 
Wabash and Embarras Rivers, immediately north of 
St. Francisville, Ill. 
Existing project. Provides for enlargement of 5.8 miles 
of earth levee and 0.25 mile of railroad fill, and 
construction of necessary appurtenances. Levee enlargement 
will begin at New York Central Railroad fill 
near St. Francisville and extend along right banks of 
Wabash and Embarrass Rivers to Billett Hills. A 
705

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
second short length of levee enlargement will extend 
from Billett Hills to high ground. Project will protect 4, 
250 acres of agricultural land against a flood equal to 
that expected seven times per 100-year period. Estimated 
total cost of new work (1970) is $932,000 of 
which $107,000 is non-Federal cost. Project was 
authorized by 1946 Flood Control Act. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, as amended, applies. England Pond Drainage 
District has completed acquisition of rights-of-way and 
appropriate authorization-of-entry has been furnished. 
Operations and results during fiscal year. Plans and 
specifications for levee and floodwall were completed. 
Condition at end of fiscal year. Construction has not 
started. 
23. EVANSVILLE, IND. 
Location. In Vanderburgh County, Ind., on right 
bank of Ohio River, 792.2 miles below Pittsburgh, Pa. 
Existing project. Construction of a system of levees and 
concrete floodwalls, together with pumping plants for 
disposal of interior drainage, at Evansville. For further 
details, see Annual Report for 1962, page 1127. Project 
will provide protection for city of Evansville, Ind., 
against Ohio River floods equal to 1937 flood 
(maximum of record), with a 3-foot freeboard. Estimated 
total cost of new work (1970) is $24,450,000 
including non-Federal cost of $3,550,000. Existing 
project selected for construction under general authorization 
for Ohio River Basin in 1937 Flood Control 
Act. 
Local cooperation. Section 3 of Flood Control Act of 
June 22, 1936, as amended, applies. Fully complied 
with for Howell unit 1 and Knight Towship sections. 
Assurances for Pigeon Creek section, unit 1, were 
executed February 11, 1963. 
Operations and results during fiscal year. General design 
memorandum Pigeon Creek Section, Unit 2 is complete, 
approval pending submission and approval of 
supplemental design memorandum. Supplemental 
design memorandum is 10 percent complete. 
Condition at end of fiscal year. Knight Township, 
Howell-Unit 1, and Pigeon Creek Unit 1 are complete. 
Howell-Unit 2 and Pigeon Creek Unit 2 construction 
not started. Project is 30 percent overall. 
24. FALMOUTH LAKE, KY. 
Location. The dam site is on the Licking River, about 
60.6 miles above the mouth. This site, in Pendleton 
County, is about 9 miles above Falmouth, Ky., about 
35 miles south of Cincinnati, Ohio, and about 50 miles 
north of Lexington, Ky. The lake area lies in 
Pendleton, Bath, Bracken, Fleming, Harrison, Nicholas 
and Robertson Counties. 
Existing project. A reservoir for flood control and allied 
purposes. Dam will be earth and rock-fill about 1,320 
feet long and 147 feet maximum height with an 
uncontrolled outlet conduit through the base of the 
dam. Total storage capacity will be 898,300 acre-feet, 
of which 648,600 acre-feet will be for flood control. 
Estimated cost of new work (1970) is $55,500,000, 
including $2,354,000 non-Federal costs for recreation. 
The project was authorized by the Flood Control Acts 
of 1936 and 1938. 
Local cooperation. Local interests must agree to 
administer project lands and water areas for recreation; 
pay, contribute in kind, or repay (which may 
be through user fees) with interest, one-half of the 
separable cost of the project allocated to recreation; 
and bear all costs of operation, maintenance and 
replacement of recreation facilities provided the sizing 
and responsibility for development, operation, maintenance 
and replacement of recreation features of the 
reservoir may be modified in accordance with the 
alternatives cited in the Federal Water Project Recreation 
Act, dependent on the intentions of non- 
Federal interests regarding participation in costs of this 
feature at the time of construction and subsequent 
thereto. 
Operation and results during fiscal year. Preconstruction 
planning started in June 1970. 
Condition at end of fiscal year. Preconstruction planning 
was started in June 1970 and consisted of preliminary 
work prerequisite to study of alternatives requested by 
Appropriations Committee. 
25. FRANKFORT, KY. (NORTH 
FRANKFORT AREA) 
Location. The authorized Frankfort project is located 
in Franklin County, northcentral Kentucky, and lies 
on both banks of Kentucky River, 66 miles above 
mouth. The North Frankfort Area is located on the 
right bank of the river and is comprised of the Thorn 
Hill, Old Capitol and Distillery Sections of Frankfort. 
Existing project. Plan is a portion of authorized project 
for Frankfort. It provides for 770 feet of concrete wall, 
3,300 feet of earth levee, two pumping plants, and 
other necessary appurtenances to protect 430 acres of 
urban and suburban land in the North Frankfort 
section of city, against maximum flood of record (1937) 
with 3-foot freeboard. Project was authorized by 
general authorization for Ohio River Basin in 1938 
Flood Control Act. Estimated total cost of North 
Frankfort project (1970) is $3,154,600 of which $272, 
100 is non-Federal cost for lands and damages, and 
alterations to utilities. In addition, the Commonwealth 
of Kentucky contracted to relocate a road on the levee 
crown in the vicinity of the Jones Run Pumping Plant. 
The final cost to the State for the road was $56,000. 
Remainder of project for Frankfort is deferred. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. City has completed acquisition of 
rights-of-way and appropriate authorizations of entry 
have been furnished. 
706

LOUISVILLE, KY., DISTRICT 
Operations and results during fiscal year. Engineering and 
design studies continued and plans and specifications 
for relocated grout curtain were completed. Construction 
contract for Levee and Floodwall advanced to 
98% complete at a fiscal year cost of $221,400. Contract 
for Sewer Diversions was completed at a cost of $48,500 
for fiscal year. Pumping Plant contract advanced to 
93% complete at a fiscal year cost of $472,600. 
Condition at end of fiscal year. Sewer Diversions are 
complete. Construction of the Levee and Floodwall 
and Pumping Plants is 98 and 95 percent complete, 
respectively. Project is about 85 percent complete 
overall. 
26. GREENFIELD BAYOU LEVEE, IND. 
Location. In southern Vigo County, Ind., from mile 
188.1 to 200.0 above mouth of Wabash River, on left 
bank below Terre Haute, Ind. 
Existing project. Provides for construction, reconstruction, 
enlargement or setback, of total 13.7 
miles of earth levee, three drainage structures, and 
necessary road ramps. Levee would protect 11,370 
acres of land, including communities of Hutton and 
Vigo, from flood equal to that expected on an average 
of seven times per 100-year period. Estimated total cost 
of new work (1970) is $3,221,000, of which $401,000 is 
non-Federal cost for lands and damages, and road and 
utility relocations. Project was authorized by 1946 
Flood Control Act. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Assurances of cooperation were 
accepted from the Greenfield Bayou Levee and Ditch 
Association on January 15, 1964. 
Operations and results during fiscal year. Design Memorandum 
Report on Economics and general design 
memorandum are complete. Minimum planning 
continued as required for coordination with Levee and 
Ditch Association. 
Condition at end of fiscal year. Construction has not 
started. 
27. GREEN RIVER LAKE, KY. 
Location. Damsite is 305.7 miles above mouth of 
Green River in Taylor County, Ky., about 8 miles 
south of Campbellsville. Reservoir will lie in Taylor 
and Adair Counties. 
Existing project. Provides for construction of reservoir 
for flood control and allied purposes. Dam is earth and 
rock fill, 141 feet high and 2,350 feet long. Outlet works 
is slide gate-controlled and spillway open and uncontrolled. 
Total storage capacity is 723,200 acre-feet 
(560,600 for flood control and 64,500 for low-flow 
augmentation). Estimated cost of new work (1970) is 
$36,577,000 including $3,693,000 for construction of 
recreation facilities under the completed project 
program. Existing project was authorized under 
general authorization for Ohio River Basin in 1938 
Flood Control Act. 
Local cooperation. None required by authorizing act. 
Taylor County, by lease approved by Secretary of 
Army February 15, 1968, has undertaken operation 
and maintenance of Smith Ridge public access area. 
Under provisions of Water Supply Act of 1958, 
contract with City of Campbellsville for water supply 
storage was approved by Secretary of Army April 23, 
1969. Terms require City to repay, with interest and 
annual charges for operation, maintenance and major 
replacement, the investment cost of $85,765 allocated 
to its water supply storage space. The Kentucky 
Department of Parks has expressed intent to manage 
the Lone Valley public access area. 
Operations and results during fiscal year. New work: 
Engineering and design and real estate activities 
continued. Remaining road relocations were completed 
at fiscal year cost of $215,092. Construction of 
roads, launching ramps and parking areas at 5 public 
access sites was completed; cost for year was $349,462. 
Construction of operator's quarters and shop was 
begun and advanced to 68 percent of completion at 
cost of $167,000. Maintenance: Routine maintenance 
was performed. Operation for flood control prevented 
damages estimated at $923,000 during the 1970 flood 
season. 
Condition at end of fiscal year. Land acquisition is 
complete except for remaining condemnation proceedings. 
Construction began in August 1965 and 
project was placed in operation February 17, 1969. 
Project is 94 percent complete overall. Work yet to be 
done consists of completion of quarters and shop and 
construction of recreation facilities, structures and 
utilities at 6 public access sites. 
28. HUNTINGTON LAKE, IND. 
Location. Damsite is on Wabash River, about 2 miles 
from Huntington, Ind., and 411.4 miles above mouth. 
Reservoir will be in Huntington and Wells Counties, 
Ind. 
Existing project. Provides for construction of a reservoir 
for flood control and recreation. Dam will consist of a 
rolled earth embankment 4,700 feet long and 89 feet 
high, a concrete spillway and outlet section 155 feet 
long, and a concrete graVty section 310 feet long. 
Spillway will be controlled by three gates, and outlet 
works by six sluices. Plan also provides for local 
protection of Markle, Ind. Total storage capacity of 
reservoir will be 153,100 acre-feet, of which 149,000 
acre-feet will be reserved for flood control storage. 
Estimated project cost for new work (1970) is $19,463, 
500, of which $19,269,700 is Federal cost and $193,800 
non-Federal contribution. Project was authorized by 
Flood Control Act of 1958. 
Local cooperation. Local interests must contribute in 
cash an amount equal to one percent of project first 
cost. State of Indiana assumed this obligation. 
707

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. Contracts for 
relocation of U. S. Highway 224, Indiana Highway 
116, Wells County Road and Indiana Highway 303 
were completed. Completed construction of dam. 
Completed 51% of contract for Additional Facilities. 
Performed routine maintenance. Acquired 10 tracts of 
land. Completed contract for Comfort Station below 
dam, Operator's Quarters, Shop and Utilities. Flood 
damages of $595,400 were prevented during 1970 flood 
season. 
Condition at end of fiscal year. All major construction 
and relocation contracts are complete. Reservoir was 
placed in operation on January 9, 1969. Project is 
96.7% complete overall. 
29. INDIANAPOLIS, IND. 
Location. In Marion County, Ind., on White River, 
232 to 250 miles above the mouth. 
Existing project. Project is in two parts, Warfleigh and 
Fall Creek. Fall Creek Section I extends from Washington 
Street to 10th Street and includes 6,350 feet of 
channel improvement of White River, 1,180 feet of 
concrete wall, 2,050 feet of earth levee, 1,530 feet of 
roadway levee, reconstruction of Michigan Street 
bridge, and extension of 10th Street bridge. Fall Creek 
Section II includes 1,200 feet of channel improvement 
of White River above 10th Street, 6,400 feet of channel 
improvement of Fall Creek from mouth to 16th Street, 
12,011 feet of new earth levee and levee enlargements 
along Fall Creek and White River, and reconstruction 
of Indiana Ave. bridge over Fall Creek. Warfleigh 
section comprises channel improvement of White 
River from Northwestern Boulevard to Broad Ripple 
Dam and levee along left bank of White River, 
reconstruction of Kessler Boulevard and Westfield 
Road bridges and raising of Monon Railroad bridge. 
Project also includes necessary sewer and drainage 
outlet changes. Project will protect urban areas in 
Indianapolis along Fall Creek and White River against 
a flood equal to that of 1913, the maximum on record. 
Estimated Federal cost of project (1970) is $11,600,000, 
estimated non-Federal cost is $2,030,000. Project was 
authorized by Flood Control Acts of June 22, 1936 and 
July 24, 1946. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, as amended, applies and is fully complied 
with for Fall Creek Section I. Federal project for 
Indianapolis conforms to comprehensive flood control 
plan adopted by local interests after flood of 1913. 
Local interests accomplished portions of plan before 
authorization of Federal project and after Federal 
construction of Fall Creek section I expressed desire to 
continue with construction of Fall Creek Section II, 
which they later built generally in accordance with the 
authorized Federal project. Local interests indicated 
intent to fulfill requirements for Warfleigh section. 
Operations and results during fiscal year. Report on 
economics on Warfleigh Section was completed. 
Condition at end of fiscal year. Fall Creek Section I is 
complete. Fall Creek Section II was constructed by 
local interests generally in accordance with project 
plan. Economic study of Warfleigh Section is complete. 
30. ISLAND LEVEE, IND. 
Location. In Sullivan County, Ind., from 169.4 to 179 
miles above mouth of Wabash River, across river from 
Hutsonville and York, Ill. 
Existing project. Provides for construction 9.3 miles of 
earth levee, four drainage structures, and related 
appurtenances. Levee will generally parallel left bank 
of Wabash River from miles 179 to 170 and then 
extend along north bank of Turman Creek to tie in at 
high ground. Project will protect 5,260 acres of flood 
plain from floodflow having a frequency of 7 times per 
100 years. Estimated total cost of new work (1970) is $2, 
094,000, of which $194,000 is non-Federal cost for 
lands, damages, and bridge and utility alterations. 
Project was authorized by 1946 Flood Control Act. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936 as amended, applies. Levee Association in 
process of acquiring authorization-of-entry. 
Operations and results during fiscal year. Minimum 
planning continued as required for coordination with 
Levee Association. 
Conditions at end of fiscal year. Construction has not 
started. Project is about 6 percent complete overall. 
31. LAFAYETTE LAKE, IND. 
Location. Damsite is in Tippecanoe County, Ind., 4 
miles east of Lafayette, and 7.2 miles above mouth of 
Wildcat Creek, tributary of Wabash River. Reservoir 
will also extend into Clinton, Tippecanoe, and Carroll 
Counties. 
Existing project. A reservoir for flood control and allied 
purposes. Dam will be earthfill, 3,350 feet long and 116 
feet high, with gate controlled outlet works and 
uncontrolled open-cut spillway. Storage capacity will 
be 332,550 acre-feet, of which 313,320 acre-feet will be 
for flood control. Estimated cost of new work (1970) is 
$45,507,000, of which $41,700,000 is Federal cost. $1, 
382,000 is Federal cost for construction of recreation 
facilities under completed project program, and $2, 
425,000 is non-Federal contribution for recreation 
facilities. Project was authorized by 1965 Flood Control 
Act. 
Local cooperation. Local interests must agree to 
administer project land and water areas for recreation 
and fish and wildlife enhancement; pay, contribute in 
kind, or repay (which may be through user fees) with 
interest one-half the separable costs allocated to 
recreation and fish and wildlife enhancement; and 
bear all costs of operation, maintenance, and replacement 
of recreation and fish and wildlife lands and 
facilities. Local interests must also agree to prevent 
encroachments on channel of Wildcat Creek from dam 
708

LOUISVILLE, KY., DISTRICT 
to mouth. State of Indiana indicated intent to fulfill 
requirements. 
Operations and results during fiscal year. Advanced 
completion of General Design Memorandum to 75% 
completion. Completed 35% Design Memorandum, 
Land Requirements Plan, Public Use. Completed 20% 
Design Memorandum, Real Estate, Initial Construction 
Area. 
Condition at end of fiscal year. Design Memoranda for 
Hydrology and Hydraulics and Site Selection are 
complete. Also, Draft Design Memorandum for Project 
Formulation is complete. Construction has not started. 
32. LEVEE UNIT NO. 1, WABASH RIVER, 
ILL. 
Location. On right banks of Wabash and Ohio Rivers 
in Gallatin County, Ill., from mile 15.5 Wabash River 
near New Haven, downstream to Shawneetown Hills 
at mile 852.2, Ohio River. 
Existing project. Provides for construction of two 
sections of earth levee, having a total length of 14.7 
miles, and other necessary appurtenances. Levee would 
extend from near New Haven down to Shawneetown 
Hills, with a second short section extending across low 
ground west of Shawneetown Hills and south of Inman. 
Project will protect about 23,400 acres of agricultural 
land against a flood equal to that expected seven times 
per 100-year period. Estimated total cost of new work 
(1960) is $4,526,000, of which $96,000 is non-Federal 
cost. Project was authorized by 1936 Flood Control 
Act. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, as amended, applies. 
Operations and results during fiscalyear. None. 
Condition at end of fiscal year. Construction has not 
started. 
33. LEVEE UNIT NO. 5, WABASH RIVER, 
IND. 
Location. In Gibson and Posey Counties, Ind., on left 
bank of Wabash River, from 58 to 94.5 miles above 
mouth. 
Existing project. Provides for construction of 41.9 miles 
of earth levee; drainage structures, together with 
alterations to three railroad bridges crossing Wabash 
River. Project will provide protection for 44,000 acres 
of farm land and towns of Lyle, Skelton, and Griffin, 
Ind., against a flood equal to that expected on an 
average of seven times in each 100-year period. 
Estimated total cost of new work (1970) is $6,261,000, 
of which $501,000 is non-Federal cost for lands and 
damages and road and utility relocations. Project was 
authorized by Flood Control Acts of 1936 and 1946. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Assurances were executed by 
Superintendent of Levee District on January 8, 1962. 
Completed portions of the project (Levees) were 
transferred to the Levee District for operation and 
maintenance October 15, 1969. 
Operations and results during fiscal year. Construction of 
Wabash-Black River Section was completed at fiscal 
year cost of $11,042. Contract for Remedial Work, 
Wabash River, was advanced to 98 percent complete at 
a fiscal year cost of $43,983. Plans and specifications for 
Alterations of I. C. RR Bridge and Approaches are 80 
percent complete. Engineering and design studies 
continued. Design Memorandum, Pumping Plants 
Feasibility, was completed. Flood damages of $310,200 
were prevented during the 1970 flood season. 
Conditions at end of fiscal year. All sections of levee and 
required alterations of the Penn Central Railroad and 
the Southern Railroad are complete. Alterations of the 
Illinois Central Railroad have not started. 
34. LINCOLN LAKE, ILL. 
Location. Damsite is in Cumberland County, Ill., on 
Embarras River (tributary of Wabash River) 106.2 
miles above mouth, and 10 miles south of Charleston, 
Ill., and 53 miles southeast of Decatur, Ill. Lake area 
will extend into Coles and Douglas Counties. 
Existing project. Reservoir for flood control and allied 
purposes. Dam will be earthfill, 2,400 feet long and 110 
feet high, with gate controlled outlet works and 
uncontrolled open cut spillway. Total storage capacity 
will be 538,300 acre-feet (476,985 for flood control 
(winter months) and 6,300 for water supply and water 
quality control). Estimated cost of new work (1970) is 
$45,448,000, of which $43,100,000 is Federal cost and 
$2,348,000 is non-Federal contribution. Project was 
authorized by 1965 Flood Control Act. 
Local cooperation. Local interests must agree to 
administer project land and water areas for recreation 
and fish and wildlife enhancement; pay, contribute in 
kind, or repay (which may be through user fees) with 
interest one-half the separable costs allocated to 
recreation and fish and wildlife enhancement; bear all 
costs of operation, maintenance, and replacement of 
recreation and fish and wildlife lands and facilities; 
reimburse the allocated construction and annual 
operation and maintenance costs allocated to water 
supply storage; prevent channel encroachments tending 
to reduce present channel capacities; hold and save 
the United States free from damages from water-rights 
claims resulting from construction and operation of the 
reservoir; exercise, to the full extent of their legal 
capability, control against removal from stream flow 
made available by reservoir storage for water quality 
control purposes; and contribute to the control of 
pollution of the stream subject to low-flow augmentation 
by adequate treatment or other methods of 
controlling wastes at their source. State of Illinois will 
probably be the responsible cooperating agency for all 
assurances. 
Operations and results during fiscalyear. Engineering and 
design studies continued. Draft of General Design 
709

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Memorandum was completed. Design Memorandum, 
Relocation Illinois State Roads, advanced to 70 
percent complete. Design Memoranda, Concrete 
Aggregates and Stone Protection Sources, and Land 
Requirements Plan, Public Use, are 50 and 30 percent 
complete, respectively. 
Condition at end of fiscal year. Design Memorandum, 
Hydrology and Hydraulics, and Draft of General 
Design Memorandum, are complete. 
35. LOUISVILLE, OHIO RIVER BASIN, 
KY. 
Location. Louisville is located in Jefferson County, 
Ky. on the left bank of the Ohio River, 607 miles below 
Pittsburgh, Pa. 
Existing project. Local protection works consist of a 
system of levees, concrete walls, and pumping plants. 
For further information see 1962 Annual Report pages 
1121 and 1122. Remedial construction consists of 
Improvements to Trash Raking Installation at Beargrass 
Creek Pumping Plant and Ventilation & 
Dehumidification Systems at Paddy's Run & Western 
Parkway Pumping Plants. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Local interests 
performed routine maintenance of the project. Engineering 
and design studies continued for remedial 
construction measures on three pumping plants. 
Condition at end of fiscal year. Construction of the 
project was started in March 1947 and completed in 
March 1956. Remedial Construction (Improvement to 
Trash Raking Installation), Beargrass Creek Pumping 
Plant plans and specifications are 90 percent complete. 
Remedial construction (Ventilation and Dehumidification 
System) Paddy's Run and Western 
Parkway Pumping Plants plans and specifications 60 
percent complete. 
36. LOUISVILLE LAKE, ILL. 
Location. Damsite is on the Little Wabash River 164.8 
miles above the mouth and about 3.5 miles northwest of 
Louisville, and 23 miles south of Effingham, Illinois. 
The lake area lies in Clay and Effingham Counties. 
Existing project. A reservoir for flood control and allied 
purposes. Dam will be concrete and earth fill 69 feet 
high and with 9,583 feet earth and 417 feet of concrete 
having four tainter gates and three gated sluices for 
water control. Total storage capacity 230,800 acre-feet 
of which 148,000 acre-feet will be for flood control. A 
low dike 4,400 feet long will be constructed parallel to 
the railroad on the right abutment. Estimated cost of 
new work (1970) is $30,900,000, of which $6,917,000 
would be reimbursed by non-Federal interests. Project 
was authorized by 1968 Flood Control Act. 
Local cooperation. Local interest must agree to administer 
project land and water areas for recreation 
and fish and wildlife enhancement: pay, contribute in 
kind, or repay with interest (which may be through 
user fees) one half of separable costs allocated to 
recreation and fish and wildlife enhancement; bear all 
costs of operation, maintenance, and replacement of 
recreation and fish and wildlife lands and facilities; 
reimburse the allocated construction costs allocated to 
water supply storage; bear all costs of operation, 
maintenance and replacement of water supply storage 
facilities; prevent channel encroachments tending to 
reduce present channel capacities; hold and save the 
United States free from damages from water-rights 
claims resulting from construction and operation of the 
reservoir; exercise, to the full extent of their legal 
capability, control against removal from stream flow 
made available by reservoir storage for water quality 
control purposes; and contribute to the control of 
pollution of the stream subject to low-flow augmentation 
by adequate treatment or other methods of 
controlling wastes at their source. The State of Illinois 
will be the responsible cooperating agency for all 
required assurances. 
Operations and results during fiscal year. None. Preconstruction 
planning to start in FY 1971. 
Condition at end of fiscal year. Preconstruction planning 
has not started. 
37. MANSFIELD LAKE, IND. 
Location. Dam is on Raccoon Creek, 32.4 miles above 
its confluence with Wabash River, and 25 miles 
northeast of Terre Haute, Ind. At flood control pool, 
reservoir extends upstream about 15 miles in Parke and 
Putnam Counties, Ind. 
Existing project. A rolled earth dam and reservoir, for 
flood control and allied purposes. Total storage 
capacity is 132,800 acre-feet of which 116,600 acre-feet 
are for flood control. For details, see Annual Report for 
1962, page 1132. Estimated Federal cost of new work 
(1969) is $6,279,800 including $19,700 for construction 
of recreation facilities under the completed project 
program. Project was selected for construction under 
general authorization for Ohio River Basin in 1938 
Flood Control Act. 
Local cooperation. Department of Conservation, State 
of Indiana, has undertaken management of lands and 
recreational facilities in accordance with license 
granted by Secretary of the Army on April 19, 1961. 
Operations and results during fiscal year. New work: 
None. Maintenance: Routine maintenance was performed. 
Flood damages of $178,000 were prevented 
during the 1970 flood season. 
Condition at end of fiscal year. Construction of all major 
items of work completed December 1961. Reservoir has 
been in operation since August 1960. All major items of 
work are complete. Land acquisition is complete. 
710

LOUISVILLE, KY., DISTRICT 
38. MASON J. NIBLACK LEVEE, WABASH 
RIVER, IND. 
Location. In Knox and Sullivan Counties, Ind. on left 
bank of Wabash River, between miles 134.8 and 151.8 
above mouth. 
Existing project. Construction of two sections of earth 
levee totaling 18 miles in length, pumping plant for 
disposal of interior drainage, and other necessary 
appurtenances. Line of protection, including high 
ground between the two levee sections, is 18.9 miles 
long. Project protects 15,900 acres of agricultural land 
against a flood equal to that expected to occur seven 
times in a 100-year period. Estimated cost of new work 
(1970) is $2,573,900, of which $109,200 is non-Federal 
cost. The levee project was authorized by the 1946 
Flood Control Act; pumping facilities were authorized 
by 1968 Flood Control Act. 
Local cooperation. Section 3 of Flood Control Act of 
June 22, 1936, as amended, applies. Fully complied 
with for levees. 
Operations and results during fiscal year. Operation by 
local interests for flood control prevented damages 
estimated at $198,200. 
Condition at end of fiscal year. Construction of levees is 
complete and this portion of project was transferred to 
Mason J. Niblack Levee District in January 1965 for 
operation and maintenance. Preconstruction planning 
for pumping facilities has not started. 
39. MILL CREEK, JEFFERSON COUNTY, 
KY. 
Location. Mill Creek is in southwestern Jefferson 
County, Ky. The stream flows generally in a westerly 
direction to its confluence with the Ohio River at mile 
616.3 downstream from Pittsburgh, Pa. 
Existing project. The improvement consists of enlargement 
and straightening of about 0.95 mile of the 
main stream. The size of channel improvement 
provides relief for flows having a frequency of about 
one time in 15 years. Project was adopted under 
authority of Section 205, Flood Control Act of 1948, as 
amended. Estimated cost of new work (1966) is $981, 
000, of which $423,000 is non-Federal. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, as amended, applies. Local interests must also 
provide improvement of Boxwood Ditch, East Branch 
of Boxwood Ditch, reconstruction of two bridges, utility 
alterations and procurement of rights-of-way. Assurances 
were furnished July 1966. 
Operations and results during fiscalyear. Land acquisition 
by local interests is underway. 
Condition at end offiscalyear. Preconstruction planning 
is complete, construction has not started. 
40. MISSISSINEWA LAKE, IND. 
Location. Damsite is 7.1 miles above mouth of 
Mississinewa River, which flows into Wabash River 
about 2 miles upstream from Peru, Ind. At flood 
control pool level, reservoir will extend upstream about 
28 miles, in Wabash, Grant, and Miami Counties, Ind. 
Existing project. Provides for construction of a reservoir 
for flood control and allied purposes. It includes an 
earthfill dam 137 feet high and 8,100 feet long, gate 
controlled outlet works, and an uncontrolled open 
spillway through right abutment. Total storage capacity 
of reservoir will be 368,400 acre-feet, of which 
345,100 acre-feet will be reserved for flood control 
storage. Estimated project cost for new work (1970) is 
$23,739,200 of which $23,502,100 is Federal cost and 
$237,100 non-Federal contribution. Project was authorized 
by Flood Control Act of 1958. 
Local cooperation. Local interests must contribute in 
cash an amount equal to 1 percent of project first cost. 
State of Indiana assumed this obligation. 
Operations and results during fiscal year. Completed 
contracts for additional Cemetery Relocation, Access 
Road Repairs and Shoulder Stabilization, Public 
Access Facilities, and Operators Quarters and Shop. 
Flood damages of $642,300 were prevented during 
1970 flood season. 
Condition at end of fiscal year. All major construction 
and relocation contracts are complete. Reservoir was 
placed in operation in May 1968. Project is 99.9% 
complete overall. 
41. MONROE LAKE, IND. 
Location. Dam is on Salt Creek, a tributary of White 
River, 25.9 miles above mouth, and 2 miles east of 
Harrodsburg, Monroe County, Ind. At flood control 
pool level, reservoir will extend upstream 44 miles in 
Monroe, Brown, and Jackson Counties. 
Existing project. A reservoir for flood control and allied 
purposes. Dam is earth core and rock shell, with gatecontrolled 
outlet works and uncontrolled open spillway. 
Total storage capacity is 441,000 acre-feet (258, 
800 is for flood control and 159,900 for low flow 
augmentation). Estimated cost of new work (1969) is 
$14,836,000 of which $8,018,700 is non-Federal contribution. 
Project was authorized by 1958 Flood 
Control Act, modifying comprehensive plan for Ohio 
River Basin. 
Local cooperation. Section 3, 1944 Flood Control Act 
applies. Local interests must contribute 54.1 percent of 
project cost, this being the proportion allocated to lowflow 
regulation feature, plus a capitalized amount 
representing that part of average annual maintenance 
and operation cost allocated to low-flow regulation. 
State of Indiana assumed this cost-sharing obligation. 
Operations andresults during fiscal year. Design Memorandum 
No. 10, Supp. 1, Additional Real Estate is 
complete. Additional real estate acquisition is com- 
711

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
plete. Sedimentation survey is 65 percent complete. 
Flood damages of $542,600 were prevented during 
1970 flood season. 
Condition at end of fiscal year. All major construction 
items have been completed and the project was placed 
in operation in February 1965. Project is 99.9 percent 
complete overall. 
42. MOREHEAD, TRIPLETT CREEK, KY. 
Location. Morehead is in northeastern Kentucky, and 
the stream reach extends from near the northern end of 
Morehead, downstream about 2 miles. 
Existing project. Consists of widening, deepening and 
straightening about 2 miles of Triplett Creek channel. 
Project would provide about 3 feet reduction in stage 
for 100-year flow and greater reductions for lesser 
flows. Project was adopted under authority of Section 
205, Flood Control Act of 1948, as amended. Estimated 
cost of new work (1963) is $775,000, of which $90,000 is 
non-Federal costs for lands and damages, utility and 
bridge alterations. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, as amended, applies. Local interests must also 
alter bridges and utilities and prevent future encroachments 
on improved waterway. Assurances were 
accepted March 7, 1967 and authorization-of-entry 
was received August 18, 1969. 
Operations and results during fiscal year. Engineering and 
design continued. Construction contract for channel 
improvement was awarded June 30, 1970. 
Condition at end of fiscal year. Construction has not 
started. 
43. MT. CARMEL, ILL 
Location. Mt. Carmel levee is at Mt. Carmel, Wabash 
County, Ill. on right bank of Wabash River, from mile 
93.6 to 95.6. 
Existing project. Provides for construction of 15,564 
feet of earth levee, 1,734 feet of concrete wall, 5 
pumping plants, and other necessary appurtenances. 
Levee will begin at high ground on left bank of 
Greathouse Creek, about 5,000 feet above mouth, 
extend generally along line of Greathouse Creek to 
right bank of Wabash, upstream along right bank to 
4th Street, Mt. Carmel, then curve westerly to high 
ground at 7th Street. Project will provide protection to 
380 acres of agricultural land and 160 acres of 
industrial and semiurban developed land against a 
flood equal to that expected to occur once in 100 years. 
Estimated cost of new work (1970) is $1,968,200, 
Federal, and $113,000 non-Federal. Project was 
authorized by Flood Control Act of 1962. 
Local cooperation. Assurances were executed October 
22, 1963. Land acquisition by local interests is 
complete except for the levee extension. 
Operations and results during fiscal year. Construction of 
pumping plants was complete. Drainage ditches for 
Pumping Plant and Remedial Work was begun and 
advanced to 98 percent completion at a fiscal year cost 
of $98,248 and $52,443, respectively. Plans and 
specifications, Levee Extension, are 75 percent complete. 
Condition at end of fiscal year. Construction of the Levee 
and Floodwall and the Pumping Plants is complete. 
The project is about 99 percent complete overall. 
44. NOLIN RIVER LAKE, KY. 
Location. Dam is on Nolin River, 7.8 miles above its 
confluence with Green River, about 70 air miles 
southwest of Louisville, Ky. Reservoir extends upstream 
about 57 miles and is in Edmonson, Grayson, 
Hart, and Hardin Counties, Ky. 
Existing project. A reservoir for flood control and allied 
purposes. Dam is rockfill-earth core type, with gate 
controlled outlet works, and uncontrolled open spillway. 
Total storage capacity is 609,400 acre-feet of 
which 570,100 acre-feet is for flood control. For further 
details of project, see Annual Report for 1962, page 
1124. Estimated Federal cost of new work (1970) is $16, 
216,300 including $1,636,000 for construction of 
recreation facilities under the completed project 
program. Project selected for construction under 
general authorization for Ohio River Basin in 1938 
Flood Control Act. 
Local cooperation. None required for authorized 
project. State of Kentucky contributed $18,195 for 
increased width of dam for public road. 
Operations and results during fiscal year. Plans and 
specifications for wash house and sewage disposal 
system at Site 7 are complete. Approval withheld 
pending completion and approval of updated Master 
Plan. Maintenance: Routine maintenance was performed. 
Operation for flood control during 1970 flood 
season prevented damages estimated at $705,600. 
Condition at end of fiscal year. All major construction 
items have been completed and the project was placed 
in operation in March 1963. Acquisition of mineral 
tracts incomplete. 
45. OHIO RIVER BASIN (LOUISVILLE 
DIST.) 
Location. Works covered by this project are a series of 
levees, floodwalls, channel improvements, and reservoirs 
in Ohio River Basin within Louisville District. 
Existing project. Individual projects considered in 
comprehensive plan within the Louisville District. (See 
Table 23-B on Authorizing Legislation at end of 
chapter). 
Operations and results during fiscal year. Only minor costs 
were incurred except for those projects which individual 
reports are given. Study of Aurora and 
Grandview, Greenfield Bayou, Indianapolis 
(Warfleigh), Ludlow-Bromley, Orleans, and Russell 
and Allison continued. 
712

LOUISVILLE, KY., DISTRICT 
Condition at end of fiscal year. Surveys, explorations, 
engineering studies, and preparation of detailed plans 
were well advanced for those units in general comprehensive 
plan for flood control in Ohio River Basin 
which are under consideration for construction in the 
near future. Status of projects selected for construction 
is given in individual reports. 
Grandview, Ind. and Ludlow-Bromley, Ky. projects 
were reclassified to inactive status on basis of completed 
economic reports. Economic reports on Levee Unit 6 
and Russell and Allison Levee, Wabash River, Ill. are 
deferred pending receipt of assurances of local cooperation. 
Economic report on Shawneetown, Ill., not 
started. 
46. ORLEANS, IND. 
Location. In Washington County, Ind., in Lost River 
Basin. 
Existing project. Plan provides for excavation of open 
channel, 8,900 feet long, beginning at intersection of 
Monroe and Third Streets in the Old Sulphur Sink in 
town of Orleans. Channel would extend southward on 
Third Street to edge of town, thence westward and 
south westward through open country to end in Lost 
River Valley. Channel along Third Street will be 
surfaced for use as roadway during nonflood periods. 
Channel will permit excess runoff, which accumulates 
in low sinkhole areas in Orleans during heavy rains, to 
flow direct to Lost River without causing serious 
overflow. Estimated cost of new work (1970) is $665, 
000 of which $395,000 is non-Federal cost for lands, 
damages, bridge and utility alterations, and road 
surfacing. Project was authorized by Flood Control Act 
of 1950. 
Local cooperation. Section 3, Flood Control Act of 1936, 
as amended, applies. 
Operations and results during fiscal year. Report on 
economics was completed. 
Conditions at end of fiscal year. Report on economics is 
underway. Construction has not started. 
47. PANTHER CREEK, KY. 
Location. Northwest Kentucky in Daviess County just 
south of Owensboro. 
Existing Project. Provides for improvement consisting 
of clearing, snagging, and removal of drifts of 45.6 miles 
of channel which includes 22.6 miles on the main stem 
of Panther Creek, 13 miles on the North Fork and 10 
miles on the South Fork. Project would provide for a 
reduction in flood damages to farmlands; for improvements 
in transportation routes; an increase in the 
effectiveness of existing ditches for removing surface 
overflow water; and conversion of lands resulting from 
reduction in flood stages and durations. Project was 
adopted under authority of Section 205, Flood Control 
Act of 1948, as amended. Estimated cost of new work 
(1965) is $470,000, of which $10,000 is non-Federal 
cost for lands and damages. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, as amended, applies. Local interests must 
prevent future encroachments on improved waterway. 
Assurances were furnished September 21, 1965. 
Operations and results during fiscal year. Construction was 
completed. 
Condition at end of fiscal year. Project is complete and 
will be transferred to Daviess County for operation and 
maintenance July 20, 1970. 
48. PATOKA LAKE, IND. 
Location. Damsite is in Dubois County, Ind., 118.3 
miles above mouth of Patoka River, and 50 miles westnorthwest 
of New Albany, Ind. Reservoir will extend 
into Dubois, Orange and Crawford Counties. 
Existing project. Reservoir for flood control and allied 
purposes. Dam will be earth and rock fill, 1,500 feet 
long and 86 feet high, with gate-controlled outlet works 
and uncontrolled open spillway. Total storage capacity 
will be 301,600 acre-feet (121,100 for flood control and 
167,500 for water supply and water quality control). 
Estimated cost of new work (1970) is $33,877,000, of 
which $19,300,000 is Federal cost, $2,257,000 is 
Federal cost for construction of recreation facilities 
under completed project program, and $12,320,000 is 
non-Federal contribution for water supply storage and 
recreation facilities. Project was authorized by 1965 
Flood Control Act. 
Local cooperation. Local interests must agree to 
administer project land and water areas for recreation 
and fish and wildlife enhancement; pay, contribute in 
kind, or repay (which may be through user fees) with 
interest one-half the separable costs allocated to 
recreation and fish and wildlife enhancement; and 
bear all costs of operation, maintenance, and replacement 
of recreation and fish and wildlife lands and 
facilities. Local interests must also agree to prevent 
encroachments on channel of Patoka River from dam 
to mouth, and to pay allocated initial and annual 
maintenance and operation costs for water supply 
storage. State of Indiana has indicated intent to fulfill 
requirements. 
Operations and results during fiscal year. Completed 
Design Memoranda: Land Requirements Plan, Public 
Use; Road Relocations; Outlet Works, and Dam and 
Spillway. Advanced completion of Design Memoranda: 
Real Estate, Segments 1-13 to 65% and Utility 
Relocations to 85%. 
Condition at end of fiscal year. Design Memoranda for: 
Hydrology and Hydraulics, General Design Memo, 
Real Estate, Initial Construction Area, Concrete 
Aggregates and Stone Protection, Land Requirements 
Plan, Public Use, Road Relocations, Outlet Works, 
and Dam and Spillway have been completed. Construction 
has not started. 
713

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
49. RED RIVER LAKE, KY. 
(DOWNSTREAM SITE). 
Location. Damsite is 42.3 miles above mouth of Red 
River, a tributary of Kentucky River, and about 4.3 
miles northeast of Slade, Powell County, Ky. 
Existing project. Provides for construction of reservoir 
for flood control and allied purposes. Dam will be earth 
and rock, 150 feet high and 1,850 feet long, with gate 
controlled outlet works and uncontrolled open spillway. 
Estimated cost of project (1970) is $20,900,000. 
Project was authorized by Flood Control Act of 1962. 
Local cooperation. None required for reservoir project. 
Kentucky Division of Flood Control and Water Usage 
gave assurances that downstream channel encroachments 
will be prevented. Provisions of Water 
Supply Act of 1958, as amended, applies to proposed 
allocation of water supply storage for future municipal 
and/or industrial use in Federal reservoirs. The 
Commonwealth of Kentucky will be the responsible 
cooperating agency. 
Operations and results during fiscal year. Engineering and 
design studies continued. Design memorandum, Hydraulics 
and Hydrology (Lower Site) complete. Draft 
of General Design Memorandum (Lower Site) is about 
50 percent complete. Lands: Continue real estate 
planning as required for Draft of General Design 
Memorandum. 
Condition at end of fiscal year. Construction has not 
started. 
50. ROCHESTER AND MCCLEARY'S 
BLUFF LEVEE, ILL. 
Location. Unit is in southeastern part of Wabash 
County, Ill. on right bank of Wabash River, from 80 to 
89 miles above mouth. 
Existing project. Provides for construction of 3.2 miles 
of levee setback, 5.4 miles of levee turnover, 0.5 mile of 
levee enlargement, for a total of 9.1 miles of levee, and 
other necessary appurtenances. Levee will provide 
protection for 5,400 acres of agricultural land against a 
floodflow equal to that expected to occur about seven 
times in each 100-year period. Estimated Federal cost 
of new work (1970) is $1,210,000; estimated non- 
Federal cost is $100,000. Existing project was authorized 
by Flood Control Act of 1946. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, as amended, applies. Rochester & McCleary's 
Bluff Levee District has completed acquisition of 
rights-of-way, and appropriate authorization-of-entry 
has been furnished. 
Operation and results during fiscal year. Construction 
contract for Levee and Floodwall was awarded on June 
22, 1970. 
Condition at end of fiscal year. Project is about 5.3 
percent complete overall. 
51. ROUGH RIVER LAKE AND CHANNEL 
IMPROVEMENT, KY. 
Location. Dam is on Rough River, 89.3 miles above its 
confluence with Green River at 160.3 miles above Ohio 
River, and about 60 miles southwest of Louisville, Ky. 
Reservoir extends upstream about 30 miles and is in 
Breckinridge, Hardin, and Grayson Counties, Ky. 
Channel improvement work is on Rough River, 
Barnett Creek, and West Fork of Barnett Creek. 
Existing project. Reservoir is for flood control and 
allied purposes. Dam is rolled earthfill type, with gate 
controlled outlet works. Storage capacity is 334,380 
acre-feet, of which 314,210 acre-feet is for flood control. 
Project also includes channel clearing of lower Rough 
River, and channel improvement on Barnett Creek, a 
tributary of Rough River. For further details see page 
1126 of Annual Report for 1962. Estimated cost of new 
work (1970) is $11,502,100 including $1,195,000 for 
construction of recreation facilities under the completed 
project program. Existing project was selected 
for construction under general authorization for Ohio 
River Basin in 1938 Flood Control Act. Modification of 
previously approved plan to include channel improvement 
items was authorized by 1944 Flood 
Control Act. 
Local cooperation. None required for construction of 
reservoir unit. Provisions of section 3, Flood Control 
Act of 1936, are applicable to channel improvements. 
Assurances obtained from Ohio County for channel 
improvement. Department of Parks, Commonwealth 
of Kentucky, has undertaken management of certain 
lands and recreation facilities in accordance with 
license granted by Secretary of the Army on August 18, 
1961. 
Operations and results during fiscal year. Plans and 
specifications for water supply system at Site 4 were 
completed. Maintenance: Routine maintenance was 
performed. Operation for flood control during 1970 
flood season prevented damages estimated at $823,900. 
Condition at end of fiscal year. Construction started in 
November 1955 and Icseivoir was placed in operation 
in June 1959. Land acquisition and all major items of 
construction and relocation are complete. 
52. SALAMONIE LAKE, IND. 
Location. Damsite is 3.1 miles above mouth of 
Salamonie River which enters Wabash River about 6 
miles upstream from Wabash, Ind. Reservoir will 
extend upstream about 27 miles at flood control pool 
and lie in Wabash and Huntington Counties, Ind. 
Existing project. Provides for construction of a reservoir 
for flood control and allied purposes. It includes an 
earthfill dam with a maximum height of 133 feet and a 
length of 6,100 feet, gate controlled outlet works with a 
16-foot diameter conduit and an uncontrolled open 
spillway through right abutment. Total storage capacity 
of reservoir will be 263,600 acre-feet, of which 
714

LOUISVILLE, KY., DISTRICT 
250,500 acre-feet will be reserved for flood control 
storage. Estimated project cost for new work (1970) is 
$16,403,000, of which $164,000 is non-Federal contribution 
and $16,239,000 Federal cost. Project was 
authorized by Flood Control Act of 1958. 
Local cooperation. Local interests must contribute in 
cash an amount equal to one percent of project first 
cost. State of Indiana assumed this obligation. 
Operations and results during fiscal year. Completed 
contracts for Boat Ramps and Public Use Facilities and 
Water Supply Facilities, Site 4A, Lost Bridge. Performed 
routine maintenance. During 1970 flood 
season, operation for flood control prevented damages 
of $819,200. 
Condition at end of fiscal year. All major construction 
and relocation contracts are complete. Reservoir was 
placed in operation in spring 1967. Project is 99.9% 
complete overall. 
53. SALINE RIVER AND TRIBUTARIES, 
ILL. 
Location. Saline River, which flows into Ohio River at 
mile 867.4 below Pittsburgh, Pa., and 10 miles below 
Shawneetown, Ill., is formed by confluence of its South 
and Middle Forks 27 miles above its mouth. North 
Fork joins main stream at stream mile 17.2 Project area 
is in Gallatin, Hamilton, and Saline Counties in 
southeastern Illinois. (See Geological Survey map for 
State of Illinois, scale 1:500,000). 
Existing project. Provides for 9.9 miles of channel 
enlargement on Saline River, 1.2 miles of clearing and 
cleaning and 29.8 miles of channel enlargement on 
North Fork, 12.2 miles of channel enlargement on 
Middle Fork, and 14.2 miles of clearing and cleaning 
on South Fork. Project will protect agricultural areas 
along 67.3 miles of improved channel from headwater 
floods with an expected frequency of once in 2 years, 
and lesser floods occurring more frequently. Project 
was authorized by 1958 Flood Control Act, and 
deletion of cash contributions by local interests was 
authorized by 1962 Flood Control Act. Estimated total 
cost of new work (1970) is $9,143,000, of which $843, 
000 is non-Federal cost for lands and damages, and 
bridge and utility relocations. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, as amended applies. Saline Valley Conservancy 
District furnished assurances of cooperation 
on March 2, 1966. Authorization-of-entry for two 
sections of project have been furnished. Conservancy 
District in process of acquiring rights-of-way for the 
remaining sections. 
Operations and results during fiscal year. Construction 
contract for Saline River Section advanced to 98 
percent at a cost of $414,010 for the fiscal year. 
Contract for North Fork Channel, Lower Section, was 
awarded June 24, 1970. Engineering and design studies 
continued and plans and specifications for North Fork 
Channel-Middle Section are about 15 percent 
complete. 
Condition at end of fiscal year. Project is about 15 percent 
complete overall. 
54. SOUTHWESTERN JEFFERSON 
COUNTY, KY. 
Location. In Jefferson County, Kentucky on left bank 
of Ohio River from mile 616 to 628.6. 
Existing Project. Provides for the construction of 89, 
600 feet of levee, 1550 feet of concrete wall, two 
pumping plants, a small lake of 800 acres, and other 
necessary appurtenances. Project will provide protection 
to 20,550 acres against 1937 flood of record with 
three foot freeboard. Estimated cost of new work (1970) 
is $31,550,000 Federal and $7,050,000 non-Federal. 
Project was authorized under Flood Control Act of 
August, 1968. 
Local cooperation. Section 3 Flood Control Act of 1936 
as amended applies. In addition, local interests must 
agree to administer project land and water areas for 
recreation and fish and wildlife enhancement; and to 
pay, contribute in kind or repay (which may be 
through user fees) with interest one-half of the 
separable first cost of the project allocated to recreation 
and fish and wildlife enhancement; and bear all costs of 
operation, maintenance and replacement of lands and 
facilities for recreation and fish and wildlife enhancement. 
Jefferson County Fiscal Court expressed 
intent to fulfill requirements by resolution dated April 
4, 1967. 
Operations and results during fiscal year. Preconstruction 
planning was initiated. 
Condition at end of fiscal year. Special 
Report-Document Plan and Relation to Flood Plain 
Development, is 50 percent complete. 
55. STURGIS, KY. 
Location. In Union County in western Kentucky, at 
confluence of Cypress Creek and Tradewater River, 6 
miles above mouth of latter stream. 
Existing project. Provides for construction of 4 miles of 
earth levee, 0.12 mile of floodwall, two pumping plants, 
and other necessary appurtenances. Project would 
provide protection for 853 acres of urban and suburban 
land against a flood equal to the maximum of record 
(1937) with 3.8 foot freeboard. Total estimated project 
cost (1970) is $1,922,900, of which $93,000 is non- 
Federal cost for lands and damages, and required 
utility alterations. Project was authorized by general 
authorization for Ohio River Basin in Flood Control 
Act of 1938. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, as amended, applies. Fully complied with. 
Project was transferred to City of Sturgis for operation 
and maintenance on January 30, 1970. 
715

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. Construction of 
pumping plants and service contract for electrical 
power to pumping plants were completed at fiscal year 
cost of $85,172 and $6,035, respectively. 
Condition end of fiscal year. The project is complete. 
56. TAYLORSVILLE LAKE, KY. 
Location. Dam site is in Spencer County, Ky., 59.5 
miles above the confluence of Salt River and Ohio 
River, three river miles above Taylorsville and 36.4 
river miles above Shepherdsville, Ky. 
Existing project. A reservoir for flood control and allied 
purposes. Dam will be an impervious earth fill 
structure, 170 feet high and 1,350 feet long. Outlet 
works will be slide gate controlled and spillway will be 
uncontrolled open cut. Total storage capacity will be 
399,100 acre-feet (278,800 for flood control, winter 
months) and 36,000 for low flow augmentation. 
Estimated cost of new work (1970) is $31,900,000, of 
which $28,578,000 is Federal cost and $3,322,000 non- 
Federal contribution. Project was authorized by 1966 
Flood Control Act. 
Local cooperation. Local interests must agree to 
administer project land and water areas for recreation; 
pay contribute in kind, or repay (which may be 
through user fees) with interest one-half of the 
separable first costs of the project allocated to recreation; 
bear all costs of operation, maintenance, and 
replacement of recreation lands and facilities. Local 
interests must also agree to prevent encroachments on 
flow-carrying capacities of stream channels below the 
reservoir to the extent needed to provide reasonably 
effective reservoir operation. Commonwealth of Kentucky 
has indicated intent to fulfill requirements. 
Operations and results during fiscal year. Preconstruction 
engineering and design studies continued. General 
Design Memorandum and Project Formulation studies 
were advanced to about 40 percent of completion. 
Condition at end of fiscal year. Preconstruction planning 
is about 57 percent complete. 
57. TRI-POND LEVEE, WABASH RIVER, 
ILL. 
Location. In Crawford County, Ill., on right bank of 
Wabash River between towns of Palestine and Hutsonville, 
and between river miles 161.5 to 171.5. 
Existing project. Provides for construction of 8.4 miles 
of earth levee, 15 drainage structures, and related 
appurtenances. Levee will begin 1.7 miles west of 
Illinois Central Railroad bridge over the Wabash and 
extend eastward 1.2 miles, crossing Stewart Pond ditch, 
and utilizing two hills for protection for 0.4 mile. From 
this point, 0.5 mile from Wabash River, levee will turn 
northward and generally parallel right bank for about 
6 miles, tieing into high ground at river mile 168.5. 
From west side of this hill levee will turn westward, 
cross two low areas, and end at high ground about 1 
mile south of Hutsonville. Project will protect 5,300 
acres of farm land against a flood expected to occur an 
average of seven times in each 100-year period. 
Estimated Federal cost of new work (1970) is $2,050, 
000, estimated non-Federal cost is $180,000. Existing 
project was authorized by Flood Control Act of 1946. 
Local cooperation. Assurances were executed October 5, 
1961, by East Crawford Drainage and Levee District, 
Crawford County, Ill. Action is underway to reorganize 
levee district. 
Operations and results during fiscal year. Minimum 
planning continued as required for coordination with 
Levee District. 
Condition at end of fiscal year. No construction scheduled 
pending establishment of a legally constituted local 
agency responsible for furnishing local cooperation. 
58. WABASH RIVER BASIN 
Location. Works covered by this project are located in 
the Wabash River Basin covering Indiana, Illinois and 
Ohio. A drainage area of 33,100 sq. mi. 
Existing project. Flood Control Act of 1968 authorized 
construction of levee, floodwall, and reservoirs in 
accordance with recommendations of the Chief of 
Engineers in Senate Document Number 96, 90th 
Congress and Big Walnut Reservoir with the proviso 
that Big Walnut Reservoir construction be approved 
by the President. Authorization provides $50,000,000 
for initiation and partial accomplishment of the 
project. 
59. WEST FORK OF MILL CREEK LAKE, 
OHIO 
Location. Dam is on West Fork of Mill Creek 6.5 miles 
above its junction with Mill Creek and 2 miles 
northeast of Mount Healthy, Ohio, and 10 miles north 
of downtown Cincinnati. Reservoir extends upstream 
about 3 miles and is in Hamilton County, Ohio. 
Existing project. An earth embankment dam and a 
reservoir for flood control, recreation, and reduction of 
pumping requirements at Mill Creek barrier dam in 
Cincinnati. Total storage capacity of reservoir is 11,300 
acre-feet, of which 9,850 acre-feet is for flood control. 
For further details see page 1119 of Annual Report for 
1962. Federal cost of completed new work is $3,092, 
942, non-Federal cost is $570,801 which includes $50, 
000 contributed in fulfillment of project authorization. 
Latest published map is in House Document 198, 80th 
Congress, 1st session. Existing project selected for 
construction under additional authorization for Ohio 
River Basin in 1946 Flood Control Act. 
Local cooperation. Local interests were to release 
necessary land under their control, give assurance that 
future channel encroachment below damsite would be 
prevented. For enlargement of reservoir to include a 
conservation pool, local interest would contribute onehalf 
additional cost of such pool, including one-half 
716

LOUISVILLE, KY., DISTRICT 
cost of relocation of sanitary sewer, and agree to hold 
the United States free from damages resulting from its 
provision. Board of county commissioners of Hamilton 
County, Ohio, adopted a resolution October 8, 1947, 
signifying willingness to fulfill requirements including 
provision of conservation pool. Assurances were executed 
on same date. A contract with the United States 
for relocation of sanitary sewer outside reservoir area in 
order to include conservation pool in project was 
accepted by Hamilton County, in which the United 
States paid one-half cost of such relocation work. 
Hamilton County Commissioners furnished $50,000, 
required as a local contribution toward additional cost 
of providing conservation pool. Hamilton County Park 
District has undertaken development and management 
of recreation facilities in reservoir area for use 
of the public in accordance with license granted by 
Secretary of the Army on October 31, 1951. 
Operations and results during fiscal year. Routine maintenance 
was performed. Operation for flood control 
during 1970 flood season prevented damages estimated 
at $71,000. 
Condition at end of fiscal year. Construction started 
March 1949 and reservoir was placed in operation in 
December 1952. Project is complete. 
60. WEST TERRE HAUTE, IND. 
Location. In Vigo County on right bank of Wabash 
River about 215 miles above mouth. 
Existing project. Provides for construction of about 2.5 
miles of earth levee, traffic ramps, and facilities for 
disposal of interior drainage. It will provide protection 
to town of West Terre Haute against a flood expected 
to occur on average of once each 100-year period. 
Estimated Federal cost of new work (1970) is $1,140, 
000 for construction and non-Federal cost of lands and 
damages is $150,000, a total cost of $1,290,000. 
Existing project was authorized under 1938 Flood 
Control Act. 
Local cooperation. Section 3, Flood Control Act of 1936, 
as amended, applies. West Vigo Levee Association, 
Inc., furnished assurances by letter dated May 16, 
1963. Authorization-of-entry was furnished on May 17, 
1968. 
Operations and results during fiscalyear. Engineering and 
design continued; Design Memorandum for Pumping 
Plant was completed. Construction contract for Levees 
and Floowall was awarded April 27, 1970. 
Condition at end offiscalyear. Project is about 12 percent 
complete overall. 
61. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Flood Control Act of June 22, 1936, and subsequent 
acts require local interests to maintain and operate 
completed local protection projects in accordance with 
regulations prescribed by Secretary of Army. In- 
451-584 0-72-46 
spections were made to determine extent of compliance 
and to advise local interests as necessary to measures 
required to correct deficiencies. (See table 23-H on 
local protection projects and channel improvements.) 
Fiscal year costs were $39,331. Total costs to June 30, 
1970, were $390,203. 
62. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 23-I. 
63. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control and coastal emergencies (pursuant to Public 
Law 99, 84th Cong., and antecedent legislation) 
Costs during fiscal year were $26,010 for advance 
preparation, $48,545 for flood emergency operations 
and $26,134 for repair of damaged levees. 
Flood control activities pursuant to Section 205, Public Law 
858, 80th Congress, as amended (preauthorization). 
Snagging and clearing navigable streams and tributaries in 
interest of flood control (Sec. 208, 1954 Flood Control Act, 
Public Law 780, 83rd Congress). 
Emergency bank protection (Sec. 14, 1946 Flood Control Act, 
Public Law 526, 79th Congress). 
(See Table 23-J). 
GENERAL INVESTIGATIONS 
64. SURVEYS 
Fiscal year costs were $761,205 of which $50,971 was 
for navigation studies, $379,604 for flood control 
studies, $3,806 for watershed studies, $36,790 for the 
Ohio River Basin review, $290,034 for the Wabash 
River comprehensive study. 
65. COLLECTION AND STUDY OF BASIC 
DATA 
Flood plain information studies of Campbell & 
Kenton Counties, Ky.; Clermont County, Ohio; 
Floyds Fork, Jefferson County, Ky.; Hamilton County, 
Ohio; and Mill and Beargrass Creeks, Jefferson 
County, Ky., were completed. Work continued on 
studies of Crooked and Williams Creeks, Marion 
County, Ind.; Dearborn County, Ind.; and Little Eagle 
Creek and Pogues & Pleasant Runs, Marion County, 
Ind. Work was begun on studies of Allen County, Ind.; 
Buck & Grassy Creeks, Marion County, Ind.; Hancock 
County, Ky.; Hazard, Ky.; Kokomo, Ind.; and Lick 
Creek and Little Buck Creek, Marion County, Ind. 
66. RESEARCH AND DEVELOPMENT. 
Fiscal year costs were $28,329, of which $3,753 was 
for hydrologic studies, $23,318 was for engineering 
studies, and $1,258 was for plan formulation and 
evaluation studies. 
717

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 23-A 
TABLE 23-A 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
See 
Section 
in Text Project Funding 
2. Green and Barren New Work: 
Rivers, Ky. Approp. 
Cost 
Maint: 
Approp. 
Cost 
3. Kentucky River, Ky. New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor rehab. 
Approp. 
Cost 
7. Barren River Lake, New Work: ,Ky. Approp. 
Cost 
Maint. 
Approp. 
Cost 
8. Big Pine Lake, Ind. New Work: 
Approp. 
Cost 
9. Big Walnut Lake, New Work: 
Ind. Approp. 
Cost 
10. Booneville Lake, New Work: 
Ky. Approp. 
Cost 
11. Brookville Lake, New Work: 
Ind. (Federal Funds) Approp. 
Cost 
(Contributed Funds) New Work: 
Approp. 
Cost 
12. Buckhorn Lake, Ky. New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
13. Caesar Creek Lake, New Work: 
Ohio Approp. 
Cost 
14. Cagles Mill Lake, New Work: 
Ind. Approp. 
Cost 
Maint. 
Approp. 
Cost 
15. Carr Fork Lake, Ky. New Work: 
Approp. 
Cost 
16. Cave Run Lake, Ky. New Work: 
Approp. 
Cost 
17. Clarence J. Brown New Work: 
Dam & Reservoir, Approp. 
Ohio Cost 
- 
319,300 
313,988 
539,250 
631,676 
176,600 
212,793 
155,500 
161,074 
150,000 
51,599 
41,393 
3,273,000 
2,701,346 
1,350,000 
761,203 
32,483 
9,991 
142,900 
129,213 
260,000 
104,867 
44,000 
6,661 
64,800 
79,765 
2,828,348 
2,878,843 
2,110,000 
2,738,411 
752,000 
1,006,907 
359,000 
345,489 
1,188,717 
468,298 
- 
792,000 852,007 
768,218 846,618 
280,600 
305,149 
742,974 
841,965 
14,100 
18,452 
169,400 
169,826 
168,000 
73,801 
13,000 
13,001 
2,560,000 
2,917,744 
425,000 
575,982 
95,000 
33,831 
205,400 
163,164 
782,100 
814,690 
23,573 
82,100 
80,606 
3,685,000 
3,655,296 
2,500,000 
1,734,582 
1,800,000 
1,468,028 
44,000 
17,945 
281,944 
275,267 
81,702 
35,000 
1,706 
230,000 
84,130 
690,0006 
1,275,116 
350,000 
362,118 
160,000 
9,469 
162,649 
168,086 
1,505,0009 
1,964,877 
94,450 
92,318 
3,870,0001 
3,879,563 
3,777,20012 
4,122,685 
13 
1,276,160 
$13,808,222 
13,808,2221 
10,551,668 
9,809,909 
4,176,749 
4,176,749 
18,331,8593 
18,291,755 
556,956 
556,956 
25,125,2004 
25,061,314 
1,087,011 
1,070,785 
513,000 
251,839 
35,000 
1,706 
580,000 
417,349 
11,394,0006 
10,176,812 
2,715,700 
2,621,072 
12,043,8917 
11,499,1638 
1,724,913 
1,120,660 
5,332,6009 
4,470,557 
4,143,58110 
4,143,58110 
885,099 
877,726 
15,119,00011 
13,771,901 
14,621,28912 
13,641,496 
5,814,000'3 
5,539,264 
718 
53,000 
26,672 
216,000 
210,617 
195,000 
44,777 
5,000 
4,115 
2,206,000 
1,313,996 
399,334 
48,024 
143,500 
199,432 
1,550,000 
1,313,370 
-8,186 
5,580 
90,000 
91,337 
2,800,000 
2,033,646 
3,100,000 
2,782,837 
1,314,000 
574,756

TABLE 23-A (Continued) 
See 
LOUISVILLE, KY., DISTRICT 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
$ 100,000 
49,098 
127,000 
54,952 
178 
Section 
in Text Project Funding 
18. Clifty Creek Lake, New Work: 
Ind. Approp. 
Cost 
19. Dayton, Ky. New Work: 
Approp. 
Cost 
20. Eagle Creek Lake, New Work: 
Ky. Approp. 
Cost 
21. East Fork Lake, New Work: 
Ohio Approp. 
Cost 
22. England Pond Levee, New Work: 
Ill. Approp. 
Cost 
23. Evansville, Ind. New Work: 
Approp. 
Cost 
24. Falmouth Lake, Ky. New Work: 
Approp. 
Cost 
25. Frankfort, Ky. New Work: 
Approp. 
Cost 
(Contributed Funds) New Work: 
Approp. 
Cost 
26. Greenfield Bayou New Work: 
Levee, Ind. Approp. 
Cost 
27. Green River Lake, New Work: 
Ky. Approp. 
Cost 
Maint. 
Approp. 
Cost 
28. Huntington Lake, New Work: 
Ind. (Federal Approp. 
Funds) Cost 
(Contributed Funds) New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
29. Indianapolis, Ind. New Work: 
Approp. 
Cost 
30. Island Levee, Ind. New Work: 
Approp. 
Cost 
31. Lafayette Lake, New Work: 
Ind. Approp. 
Cost 
32. Levee Unit No. 1, New Work: 
Wabash River, Ill. Approp. 
Cost 
33. Levee Unit No. 5, New Work: 
Wabash River, Ind. Approp. 
Cost 
5,000 
3,432 
909,900 
1,012,545 
679,000 
1,670 
148,339 
830,000 
418,876 
50,000 
1,833 
211,000 
69,585 
78,000 
47,258 
3,293 
1,600,000 
1,382,193 
1,753 
55,930 
936,000 
1,165,513 
120,050 
126,509 
17,013 
265,000 
122,659 
66,000 
4,947 
320,000 
243,969 
94,000 
95,412 
70,000 
60,758 
8,260,000 
7,304,139 
4,309,700 
3,347,667 
27,800 
33,749 
19,097 
8,235 
125,000 
123,916 
32,170 
5,000 
37,495 
5,000 
4,273 
185,000 
68,713 
18,851 
5,000 
14,820 
98,727 
2,458 
1,273 
65,353 
1,363,000 613,000 1,144,000 
1,229,626 289,584 504,066 
116,854 
89,000 
41,205 
183,000 
18,524 
1,565,0001is 
1,766,504 
-75,00017 
31,824 
447,000 
28,872 
45,000 
561 
809,200 
902,367 
14,616 
366 
500,000 
1,671,669 
202,971 
201,579 
-219,700 
916,221 
9,331 
98,866 
93,235 
1,118 
76,200 
4,323 
21 
90,310 
10,000 
148,685 
$ 438,000 
290,489 
209,745 4 
131,20714 
530,000 
353,678 
5,117,971 ,16 
4,702,294 
802,34717 
100,32217 
6,390,35518 
5,935,286 
308,821 
264,38219 
2,861,200 
2,700,257 
170,050 
142,958 
129,971 
115,726 
30,457,100 
30,156,762 
248,971 
241,806 
19,367,660 
18,663,836 
191,300 
187,724 
98,866 
93,235 
1,939,3632 o 
1,939,297 
277,927 
107,587 
851,27321 
438,387 
10,000 
5,377,368 
3,901,712 
719 
6,141 2,205 
5,355,000 4,806,000 
4,537,569 __ 5,477,149 
- 46,000 
- 40,227 
2,295,000 2,933,000 
3,198,310 1,929,599

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 23-A (Continued) 
See 
Section 
in Text Project 
34. Lincoln Lake, Ill. 
35. Louisville, Ohio 
River Basin, Ky. 
(Contributed Funds) 
36. Louisville Lake, 
Ill. 
37. Mansfield Lake, 
Ind. 
39. Mill Creek, 
Jefferson County, 
Ky. 
40. Mississinewa Lake, 
Ind. (Federal Funds) 
(Contributed Funds) 
41. Monroe Lake, Ind. 
(Federal Funds) 
(Contributed Funds) 
42. Morehead, Triplett 
Creek, Ky. 
43. Mt. Carmel, Ill. 
44. Nolin River Lake, 
Ky. 
45. Ohio River Basin, 
Louisville District 
46. Orleans, Ind. 
47. Panther Creek, Ky. 
Funding 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
$ 220,000 
197,660 
2,083 
-3,136 
8,734 
25,000 
5,403 
3,355,000 
2,790,999 
5,300 
3,535 
28,035 
184,300 
373,633 
89,400 
91,580 
83,000 
440,383 
30,000 
11,705 
146,000 
298,836 
15,000 
18,461 
184,900 
199,040 
21,007 
1,178 
20,000 
3,159 
155,000 
141,789 
-7,245
7 
20,000 
5,850 
100,000 
3,013 
420,000 
2,567,458 
60,900 
62,206 
2,500 
25,919 
55,000 
133,774 
100,500 
102,879 
52,800 
157,673 
2,817 
1,051,362 
965,064 
122,300 
45,530 
188,800 
197,598 
-8,000 
13,297 
2,488 
390,000 
42,366 
45,000 
81,690 
110,000 
13,850 
530,00022 
49,268 
75,00023 
22,436 
75,00024 
-7,314 -5,002 
3,368 - 
433,000 -340,00026 
225 270 
903,00027 
,032,469 321,827 
90,700 126,610 
88,610 124,440 
- 5,500 
10,333 3,258 
31,500 15,000 
24,675 9,215 
102,900 133,299 
101,999 125,303 
15,900 - 
25,717 8,995 
220,000 585,00030 
4,678 14,040 
108,000 63,700 
374,001 189,983 
4,000 4,800 
19,972 19,835 
235,700 268,694 
224,979 278,737 
-6,996 28,751 
6,420 4,537 
1,996 1,249 
492 5,272 
- -155,000 
192,434 12,652 
$ 1,060,00022 
559,280 
24,780,61123 
24,681,896 
1,615,700 
1,615,700 
75,00024 
6,279,81825 
6,279,81825 
579,95026 
30,782 
23,534,30027 
23,416,189 
283,510 
278,791 
239,200 
236,165 
6,857,36228 
6,816,97729 
530,120 
519,620 
8,018,700 
8,013,030 
860,52230 
558,028 
1,976,062 
1,965,816 
14,795,04031,32 
14,734,89532,33 
1,334,71032 
1,328,697 
1,489,109 
1,444,054 
13,245 
12,852 
258,446 
254,047 
720 
I

TABLE 23-A (Continued) 
LOUISVILLE, KY., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
48. Patoka Lake, Ind. New Work: 
49. Red River Lake, Ky. 
50. Rochester and 
McCleary's Bluff 
Levee, Ill. 
51. Rough River Lake & 
Channel Improvement, 
Ky. 
52. Salamonie Lake, Ind. 
(Federal Funds) 
(Contributed Funds) 
53. Saline River & 
Tributaries, Ill. 
54. Southwestern 
Jefferson County, 
Ky. 
55. Sturgis, Ky. 
56. Taylorsville Lake, 
Ky. 
57. Tri-Pond Levee, 
Wabash River, Ill. 
59. West Fork of Mill 
Creek Lake, Ohio 
60. West Terre Haute, 
Ind. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
$ 255,000 
250,973 
328,000 
119,636 
-180,000 
640 
30,000 
27,022 
216,000 
167,072 
1,998,000 
2,994,294 
72,100 
79,835 
30,245 
300,000 
35,690 
127,000 
104,963 
-16,800 
1,236 
40,700 
40,480 
7,780 
7,044 
203,000 
141,087 
-27,000 
139,909 
877,000 
733 
62,865 
39,461 
171,700 
232,146 
250,000 
1,277,983 
96,400 
96,138 
12,909 
-45,000 
52,809 
806,000 
917,159 
95,000 
52,492 
-47,124 
1,020 
47,500 
51,625 
200 
621 
400,000 
119,518 
400,000 
178,803 
1,891 
24,597 
209,900 
201,221 
22,500 
450,190 
110,800 
109,779 
4,711 
450,000 
501,278 
737,000 
552,050 
159,000 
147,869 
1,017 
185,000 
211,472 
418,000 
158,330 
-235,00034 
19,367 
39,000 
13,458 
335,340 
310,548 
85,000 
82,582 
131,928 
127,749 
569 
37 
526,933 
50,000 
37,248 
-94,000 
106,540 
231,000 
130,465 
4,388 
67,300 80,026 
66,668 71,873 
- 241,600 
109 27,225 
721 
$ 1,168,000 
737,774 
1,399,000 
816,424 
850,50034 
92,988 
9,928,38135 
9,893,39236 
1,462,648 
1,424,421 
16,233,750 
16,179,162 
441,228 
434,706 
173,300 
163,152 
2,120,00037 
1,192,095 
50,000 
37,248 
1,831,000 
1,818,408 
485,000 
330,826 
173,876 
64,636 
3,092,94138 
3,092,941 
711,833 
700,903 
350,580 
134,745

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 23-A (Continued) COST AND FINANCIAL STATEMENT 
1. Includes $85,000 public works funds. 
2. Includes $2,000 emergency relief funds, $19,000 "Maintenance 
& Operation of dams and other improvements of 
navigable waters" funds, and $3,842,667 expended from 1888 
to 30 June 1936 for operating and care of works of improvement 
under provisions of permanent indefinite appropriation for 
such purpose. 
3. Includes $203,127 allotted in prior years from appropriation 
"Maintenance and operation of dams and other improvements 
of navigable waters", and $6,405,372 expended between 
July 5, 1885 and 30 June 1937 on operation and care of works 
of improvement under provisions of permanent indefinite appropriation 
for such purposes. 
4. Includes $97,000 Code 711 funds. 
5. Includes $40,316 Code 711 funds. 
6. Includes $610,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
7. Includes $61,451 public works acceleration, executive 
1963 funds, $143,000 Code 711 funds, and $354,000 Code 712 
funds. 
8. Includes $61,451 public works acceleration, executive 
1963 funds, $121,746 Code 711 funds, and $982 Code 712 
funds. 
9. Includes $845,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
10. Includes $35,814 Code 711 funds. 
11. Includes $1,250,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
12. Includes $500,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
13. Includes $100,000 revoked and placed in FY 1970 Reserve 
for allocation in FY 1971. 
14. Includes $12,426 allotted to Bellevue-Dayton, Ky. and 
used in study of that project. 
15. Includes $335,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
16. Includes $58,571 for preconstruction planning engineering 
and design completed before FY 1953. 
17. Includes $95,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
18. Includes $11,812 emergency relief funds. 
19. Includes $263,821 for preconstruction engineering and 
design completed before FY 1953. 
20. Includes $2,889 contributed funds expended for new 
work. 
21. Includes $400,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
22. Includes $500,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
23. Includes $75,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
24. Includes $50,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
25. Includes $19,683 Code 711 funds. 
26. Includes $340,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
27. Includes $16,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
28. Includes $40,000 Code 711 funds. 
29. Includes $1,184 Code 711 funds. 
30. Includes $550,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
31. Includes $197,000 Code 711 funds. 
32. Excludes $18,195 contributed funds expended for new 
works. Includes $21,897 public works acceleration executive 
1960 funds. 
33. Includes $144,143 Code 711 funds. 
34. Includes $75,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
35. Includes $196,306 public works acceleration executive 
1963 funds and $203,000 Code 711 funds. 
36. Includes $196,306 public works acceleration executive 
1963 funds and $168,014 Code 711 funds. 
37. Includes $720,000 placed in FY 1970 Reserve for allocation 
in FY 1971. 
38. Excludes $50,000 contributed funds expended for new 
work. 
722

LOUISVILLE, KY., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
OHIO RIVER BASIN (See Section 45 of Text) 
Aug. 28, 1937 
June 28, 1938 
Aug. 18, 1941 
Dec. 22, 1944 
July 24, 1946 
May 17, 1950 
Construct levees, floodwalls, and drainage structures 
for protection of cities and towns in Ohio River Basin, 
projects to be selected by Chief of Engineers with approval 
of Secretary of War, at a cost not to exceed $24,877,000 
for construction. 
Approved general comprehensive plan for flood control and 
other purposes in Ohio River Basin as may be advisable in 
discretion of Secretary of War and Chief of Engineers, and 
for initiation and partial accomplishment of plan, 
authorized $75 million for reservoirs and $50,300,000, 
for local protection works, individual projects to be 
selected and approved by Chief of Engineers subject to 
provision that authorization shall include diversion of 
Cache River above Cairo, Illinois and protection of area 
north of Cairo drainage district by levees, at an estimated 
cost of $2 million. 
Additional $45 million for further prosecution of 
comprehensive plan for Ohio River Basin. 
Additional $70 million for further prosecution of 
comprehensive plan for Ohio River Basin, including plan 
of improvement for flood control and other purposes in 
Kentucky River Basin. 
Flood protection works at Taylorsville, Kentucky at an 
estimated cost of $129,350. 
Channel improvement of lower Rough River & Barnett Creek at 
an estimated cost of $360,000. 
Additional $125 million for further prosecution of 
comprehensive plan, including plan of improvement for 
flood control in Wabash River Basin, Illinois and Indiana 
at an estimated cost of $9,629,000. 
Also, West Fork of Mill Creek at an estimated cost of 
$1,527,000. 
Additional $100 million for prosecution of comprehensive 
plan for Ohio River Basin, including necessary bank 
stabilization measures at New Harmony Bridge, Indiana, 
at an estimated cost of $500,000. 
Flood Control Act of 1958 modified comprehensive plan to 
provide for Monroe Reservoir on Salt Creek, White River 
Basin, Indiana, at an estimated cost to United States of 
$4,359,000; cost to local interests, $5,141,000. 
Additional $274 million for further prosecution of the 
comprehensive plan approved by the Act of June 28, 1938. 
723 
TABLE 23-B 
Flood Control Committee Document 
1, 75th Cong., 1st. Session. 
Flood Control Committee Document 
1, 75th Cong., 1st Session. 
H. Doc. 504, 78th Cong., 2nd 
Sess. 
S. D. 105, 78th Cong., 1st. 
Sess. 
H. D. 535, 78th Cong., 2nd 
Sess. 
H. D. 197, 80th Cong., 1st 
Sess. 
H. D. 198, 80th Cong., 1st 
Sess. 
H. D. 192, 85th Cong., 1st 
Sess. 
Public Laws 88-253 (1963);

TABLE 23-C 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
GREEN AND BARREN RIVERS, KY.: PRINCIPAL DATA 
CONCERNING LOCKS AND DAMS 
(See Section 2 of Text) 
Greatest Elevation Depth Depth 
Length of on Lower on Upper 
Lock Location of Miles Width of of Lift at Normal Miter Miter 
from Lock Lock Normal Pool Sill at Sill at 
and Nearest Mouth of Chamber Available Pool Above Normal Normal 
Dam Town River (feet) for Full (feet) Mean Pool Pool 
Width Sea Level Level Level 
(feet) (feet) (feet) (feet) 
GREEN RIVER 
New 1 Spottsville, Ky. 9.1 84.0 600.0 11.81 349.1 11.3 12.1 
New 2 0.3 miles below Calhoun, Ky. 63.1 84.0 600.0 14.3 363.4 11.7 15.0 
3 0.3 miles below Rochester, Ky. 108.5 35.8 137.5 17.0 380.4 5.6 7.3 
4 Woodbury, Ky. 149.011 35.8 138.0 16.4 396.8 6.5 7.1 
5 0.3 mile below Glenmore, Ky. 168.110 56.0 360.0 15.2 412.0 9.3 12.0 
6 2.8 miles above Brownsville, Ky. 181.710 36.0 145.0 9.2 421.2 8.8 8.0 
BARREN RIVER 
1 0.3 mile above Greencastle, Ky. 15.02 56.0 360.0 15.2 412.0 9.3 12.0 
Lock Character of Type of Type of Year Cost of Lock 
and Foundation Dam Construction Completed and Dam 
Dam 
GREEN RIVER 
New I Shale and coal Fixed Wood crib, concrete cap 19563 $4,459,0884 
New 2 Shale Fixed Concrete masonry 1956 s 4,799,2716 
3 Rock Fixed Wood crib 1833-36 121,377 
4 Rock Fixed11 Wood crib 1839 125,718 
5 Piles and rock Fixed8 Concrete masonry 1934 1,020,8687 
6 Gravel Fixed Wood crib, concrete cap 1905 168,415 
BARREN RIVER 
1 Gravel Fixed Wood crib, concrete cap 1841 871,5659 
Piles in gravel - - 1934 
1. At normal pool dam 48, Ohio River, Elev. 337.3 Green River 6. Does not include $295,696 cost of old lock and dam 2. 
datum (Elev. 338.0 Ohio River datum). 7. Does not include $179,434 cost of old lock and dam 5. 
2. Distance from mouth of Green River is 164.5 miles 8. With movable A-frame crest 3 feet high. 
3. New lock 1, placed in operation May 25, 1956, old dam 1, com- 9. Includes $729,269 for new large lock completed in 1934. 
pleted 1835-40, still in use. 10. Operation discontinued Aug. 1, 1951. 
4. Includes $179,110 cost of old lock and dam 1. 11. Breaching of dam on 24 May 1965 stopped through traffic 
5. New lock and dam 2, placed in operation June 18, 1956. to Bowling Green, Ky. 
GREEN AND BARREN RIVERS, KY.: TERMINAL FACILITIES 
TABLE 23-D (See Section 2 of Text) 
River Mile Purpose Nearest Town 
Green 81.5 Receiving coal South Carrollton, Ky. 
Green 85.25 Loading coal South Carrollton, Ky. 
Green 85.9 Loading coal South Carrollton, Ky. 
Green 97.7 Loading coal Rockport, Ky. 
Green 99.5 Loading coal Paradise, Ky. 
Green 105.7 Loading coal Rochester, Ky. 
Green 108.1 Loading coal Rochester, Ky. 
Barren 1 29.7 Receiving gasoline Bowling Green, Ky. 
Barren1 29.9 Receiving gasoline Bowling Green, Ky. 
1. Not active. 
724

LOUISVILLE, KY., DISTRICT 
KENTUCKY RIVER, KY.: LOCKS AND DAMS 
TABLE 23-E. (See Section 3 of Text) 
Lock 
Greatest Elevation 
Available of Normal Depth on 
Dam Nearest Town Mloe Cear Length Lift of Pool Above Lower Foundation Year Cost 
from Width (full width Lock Mean Miter Sill Completed 
Mouth (feet) of lock) (feet) Sea Level (feet) 
(feet) (feet) 
11 3.8 miles above Carrollton, Ky. 4.0 38 145 8.26 430.0 4.81 Rock and clay 1839 $ 
21 Lockport, Ky. 31.0 38 145 13.9 443.9 6.1 Rock 18392 
31 Gest, Ky. 42.0 38 145 13.2 457.1 6.5 Rock 18442 1,350,3853 
41 1 mile below Frankfort, Ky. 65.0 38 145 13.2 470.3 6.3 Rock 18442 
51 2.8 miles below Tyrone, Ky. 82.2 38 145 15.0 485.3 6.4 Rock 18442 
61 21.6 miles below High Bridge, Ky. 96.2 52 147 14.0 499.3 6.4 Rock and piles 1894 314,847 
71 0.8 miles below High Bridge, Ky. 117.0 52 147 15.3 514.6 6.8 Rock 1897 290,788 
81 4.7 miles above Camp Nelson, Ky. 139.9 52 146 18.7 533.6 6.0 Rock 1900 275,463 
94 Valley View, Ky. 157.5 52 148 17.3 550.6 6.6 Rock 1907 237,646 
10 4 1 mile below Ford, Ky. 176.4 52 148 17.0 567.6 6.0 Rock 1907 221,500 
11 4 17.2 miles below Irvine, Ky. 201.0 52 148 18.0 585.6 6.0 Rock 1906 296,593 
125 Ravenna, Ky. 220.0 52 148 17.0 602.6 6.0 Rock 1910 425,693 
13 s 2.2 miles below Willow, Ky. 239.9 52 148 18.0 620.6 6.0 Rock 1915 461,476 
144 Heidelberg, Ky. 249.0 52 148 17.0 637.6 6.0 Rock 1917 392,902 
1. Fixed dam, crib construction, concrete cap. 
2. Reconstruction completed by United States in 1882. 
3. Built by State of Kentucky. Cost given is for repairs by United 
States to locks and dams 1 through 5. Original construction costs to State 
were: L&D 1, $220,300; L&D 2, $151,983; L&D 3, $135,857; L&D 4, 
$131,607; L&D 5, $137,436. 
4. Fixed dam, concrete construction 
5. Fixed dam, concrete construction, wooden crest. 
6. At normal pool McAlpine Dam, Ohio River elev. 421.8 
Kentucky River datum (Elev. 420 Ohio River datum). 
725

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
LOCAL PROTECTION PROJECTS 
Location 
I Type of Estimated Cost 
Construction Total (Date 
Federal Non-Federal ooff RReevviissiioonn)) 
Adams levee, Indiana (Wabash River) 2 
Alton, Ind.2 
Aurora, Ind.2 
Barnett Creek, Ky. (Rough River Basin)3 ' 4 
Bellevue, Ky.2 
Bonpas Creek, Ill. (Wabash River Basin) 
Bromley, Ky.2 
Brookport, Illinois 
2 ' 5 
California (Cincinnati), Ohio2 
Cannelton, Ind.2 ' 6 
Carrollton, Ky.2 
Caseyville, Ky.2 
Cave-in-Rock, Ill.2 
Cincinnati, Ohio ' 7 
Unit 2 
Unit 4 remainder 
Cleves, Ohio 2 
Clinton, Ind. (Wabash River)2 
Cloverport, Ky.2 
Concordia, Ky. 2 
Covington, Ky. 2, 14 
Dayton, Ky.2 
Deer Creek Prairie levee, Indiana 
(Wabash River) 2 
Delphi, Ind. (Wabash River) ' 8 
Derby, Ind.2 
Elizabethtown, Ill.2 
England Pond levee, Ill. (Wabash River)4 
Evansville, Ind.4 
Fletcher and Sunshine Garden levee, 
Indiana (Wabash River Basin)2 
Frankfort, Ky. (Kentucky River)2 
North Frankfort area 
South Frankfort area2 
Benson Creek area2 
Golconda, ll.2 
Grandview, Ind.2 
Greenfield Bayou levee, Indiana 
(Wabash River) 
Harrisburg, Ill. ' 9 
Hawesville, Ky. ' 13 
Honey Creek levee Indiana 
(Wabash River) 
Island levee, Indiana (Wabash River) 4 
Jackson, Ky. (Kentucky River Basin) ' 7 
Jeffersonville-Clarksville, Ind.6 
Lawrenceburg, Ind.2 '3 
HIO RIVER BASIN (LOUISVILLE DISTRICT) 
(See Section 45 of Text) 
Levee $ 292,000 
Levee 255,000 
Wall and levee 4,300,000 
Channel improvement - 
Wall and levee 1,570,000 
Channel improvement 790,000 
Wall and levee 1,250,000 
Wall and levee 597,493 
Wall and levee 1,750,000 
Wall and levee 2,068,391 
Wall and levee 2,220,000 
Levee 396,000 
Levee 661,000 
Wall and barrier dam 10,150,935 
Wall and levee 16,800,000 
Wall 14,900,000 
Levee 1,240,000 
Levee 77,000 
Wall and levee 728,000 
Levee 590,000 
Wall and levee 7,866,300 
Wall and levee 4,130,000 
Levee 213,000 
Levee 
Wall and levee 
Wall and levee 
Levee 
Wall and levee 
Levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Levee 
Levee 
Wall and levee 
Levee 
Levee 
Levee 
Cutoff channel 
Wall and levee 
Wall and levee 
144,563 
553,000 
559,000 
825,000 
20,900,000 
548,000 
2,882,500 
1,950,000 
660,000 
565,333 
580,000 
2,820,000 
870,015 
969,318 
653,000 
190,000 
130,952 
4,226,361 
2,433,414 
$ 14,000 
40,000 
1,190,000 
400,000 
473,000 
925,000 
8,500 
720,000 
29,105 
97,000 
35,000 
125,000 
1,309,146 
2,900,000 
621,000 
67,000 
9,000 
193,000 
55,000 
1,051,102 
1,736,000 
10,000 
17,164 
67,000 
153,000 
107,000 
3,550,000 
26,000 
272,100 
180,000 
140,000 
10,900 
133,000 
401,000 
20,000 
42,593 
32,000 
194,000 
3,000 
590,888 
284,725 
$ 306,000 (1960) 
295,000 (1954) 
5,490,000 (1954) 
1,970,000 (1954) 
1,263,000 
2,175,000 (1954) 
605,993 
2,470,000 (1954) 
2,097,496 
2,317,000 (1954) 
431,000 (1954) 
786,000 (1954) 
11,460,081 
19,700,000 (1954) 
15,52.1,000 (1954) 
1,307,000 (1954) 
86,000 (1954) 
921,000 (1954) 
645,000 (1954) 
8,917,402 
5,860,000 
223,000 (1960) 
161,727 
620,000 (1954) 
712,000 (1954) 
932,000 
24,450,000 
574,000 (1960) 
3,154,600 
2,130,000 (1964) 
800,000 (1964) 
576,233 
713,000 (1954) 
3,221,000 
890,015 
1,011,911 
685,000 (1954) 
2,094,000 
133,952 
4,817,249 
2,718,139 
726 
TABLE 23-F

TABLE 23-F (Cont'd) 
LOUISVILLE, KY., DISTRICT 
LOCAL PROTECTION PROJECTS 
1 Type of Estimated Cost 
Total (Date 
Location Construction Federal Non-Federal o n 
OHIO RIVER BASIN (LOUISVILLE DISTRICT) (Cont'd) 
Leavenworth, Ind. 2 
Levee unit 1, Eel River, Ind. 
(Wabash River Basin)2 
Levee unit 2, Eel River, Ind. 
(Wabash River Basin)2 
Levee unit 1, Little Wabash River, Ill. 
(Wabash River Basin) 
Levee unit 2, Little Wabash River, Ill. 
(Wabash River Basin) 
Levee unit 6, Wabash River, Ill. 
(Wabash River Basin) 2 
Levee unit 17, Indiana 
(Wabash River Basin) 
Levee unit 1, White River, Ind. 
(Wabash River Basin) 
Levee unit 2, White River, Ind. 
(Wabash River Basin) 
Levee unit 7, White River, Ind. 
(Wabash River Basin) 
Lewisport, Ky. 2 
Louisville, Ky.2' 10, 15 
Ludlow, Ky.2 
Madison, Ind.2 
Mason J. Niblack levee, Indiana 
(Wabash River) 
Mauckport, Ind.2 
McGinnis levee, Indiana 
(Wabash River Basin)2 
Metropolis, Ill.2 
Milton, Ky. 2 
Moscow, Ohio2 
New Albany, Ind.2
' 7 
New Amsterdam, Ind.2 
New Harmony Bridge, IlL and Ind.2 
New Harmony, Ind. (Wabash River) 2 
New Richmond, Ohio2 
Newport, Ky. 2,6 
Owensboro, Ky.2 
Paducah, Ky., 6 
Patriot, Ind.2 
Prestonville, Ky.2 
Raccoon levee, Indiana (Wabash River)2 
Reevesville, Ill. (Cache River)2 ' 11 
Rising Sun, Ind.2 
Rochester and McCleary's Bluff levee, 
Illinois (Wabash River)4 
Rockport, Ind.2 
Rome, Ind.2 
Rough River, Ky.3 ,4 
Wall and levee 
Levee 
Levee 
Levee 
Levee 
Levee 
Levee 
Levee 
Levee 
Levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Levee and pumping 
plants 
Levee 
Levee 
Wall and levee 
Wall 
Levee 
Wall and levee 
Levee 
Bank protection 
Levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Levee 
Wall and levee 
Levee 
Levee 
Wall and levee 
Levee 
Wall and levee 
Levee 
Channel improvement 
$ 1,470,000 $ 266,000 $ 1,736,000 (1954) 
204,000 40,000 244,000 (1954) 
2,090,000 
2,850,000 
2,500,000 
1,160,000 
1,160,000 
2,180,000 
724,000 
1,490,000 
610,000 
24,884,000 
2,540,000 
3,820,000 
2,464,000 
506,000 
1,820,000 
3,070,000 
2,480,000 
1,170,000 
5,375,471 
476,000 
903,000 
616,000 
3,200,000 
7,512,987 
886,000 
4,761,532 
753,000 
1,710,000 
426,000 
600,300 
896,000 
1,210,000 
466,000 
359,000 
715,000 
164,000 
109,000 
56,000 
94,000 
116,000 
73,000 
88,000 
243,000 
2,600,000 
745,000 
360,000 
109,200 
105,000 
104,000 
431,000 
41,000 
372,000 
740,000 
13,000 
94,000 
25,000 
720,000 
298,506 
195,000 
232,000 
372,000 
55,000 
37,000 
40,000 
280,000 
100,000 
133,000 
67,000 
2,805,000 (1954) 
3,014,000 (1961) 
2,609,000 
1,216,000 (1954) 
1,254,000 
2,296,000 (1961) 
797,000 (1961) 
1,578,000 (1961) 
853,000 (1960) 
27,484,000 
3,285,000 (1954) 
4,180,000 (1954) 
2,573,900 
611,000 (1954) 
1,924,000 (1954) 
3,501,000 (1954) 
2,521,000 (1954) 
1,542,000 (1954) 
6,115,471 
489,000 (1954) 
997,000 
641,000 (1954) 
3,920,000 (1954) 
7,811,493 
1,081,000 (1954) 
4,993,532 
1,125,000 (1954) 
1,765,000 (1954) 
463,000 (1960) 
640,300 
1,176,000 (1954) 
1,310,000 
599,000 (1954) 
426,000 (1954) 
727

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 23-F (Cont'd) LOCAL PROTECTION PROJECTS 
Estimated Cost 
Construction Federal Non-Federal Total (Date 
of Revision) 
OHIO RIVER BASIN (LOUISVILLE DISTRICT) (Cont'd) 
Russell and Allison levee, Illinois Levee $ 5,340,000 $2,025,000 $ 7,365,000 (1960) 
(Wabash River) 2 
Shawneetown, Ill. 2 Wall and levee 1,810,000 361,000 2,171,000 (1954) 
Shufflebarger levee, Indiana Levee 2,380,000 90,000 2,470,000 (1954) 
(Wabash River Basin)2 
Smithland, Ky.2 Wall and levee 864,000 414,000 1,278,000 (1954) 
Sturgis, Ky. (Tradewater River)4 Levee 1,829,900 93,000 1,922,900 
Sugar Creek levee, Indiana (Wabash River) Levee 418,000 29,000 447,000 (1960) 
Taylorsville, Ky. (Salt River)2 '9 Levee 373,050 63,309 436,359 
Tell City, Ind.2' 12 Wall and levee 932,229 32,707 964,936 
Tolu, Ky.2 Levee 303,000 35,000 338,000 (1954) 
Tri-Pond levee, Illinois (Wabash River)4 Levee 1,870,000 180,000 2,050,000 
Troy, Ind.2 Wall and levee 502,000 133,000 635,000 (1954) 
Uniontown,Ky.2 ' 12 Levee 1,070,926 72,153 1,143,079 
Utica, Ind.2 Levee 1,570,000 120,000 1,690,000 (1954) 
Vevay, Ind.2 Levee 1,170,000 146,000 1,316,000 (1954) 
Vincennes, Indiana (Wabash River)2 Wall and levee 5,835,000 285,000 6,120,000 
West Point, Ky.2 Wall and levee 3,283,000 400,000 3,683,000 (1960) 
Westport, Ky.2 Wall 1,610,000 41,000 1,651,000 (1954) 
West Terre Haute, Ind. (Wabash River)4 Levee 1,140,000 150,000 1,290,000 
Wilder, Ky.2 Wall and levee 2,190,000 220,000 2,410,000 (1954) 
WABASH RIVER BASIN (See Section 58 of Text) 
Marion, Ind. Wall and levee 1,740,000 423,000 2,163,000 
1. All projects are on Ohio River unless otherwise noted. 
2. Also see "Other authorized flood control projects." 
3. Part of Rough River Reservoir and channel improvement project, Ky. 
4. Details of this project are in individual report. 
5. Complete. See Annual Report for 1958 for details. 
6. Complete. See Annual Report for 1959 for details. 
7. Complete. See Annual Report for 1957 for details. 
8. Complete. See Annual Report for 1953 for details. 
9. Complete. See Annual Report for 1952 for details. 
10. Complete. See Annual Report for 1962 for details. 
11. Substitute project for Belknap, Karnak, and Ullin, III., 
complete. See Annual Report for 1954 for details. 
12. Complete. See Annual Report for 1956 for details. 
13. Complete. See Annual Report for 1955 for details. 
14. Complete. See Annual Report for 1965 for details. 
15. Also see individual report. 
728

LOUISVILLE, KY., DISTRICT 
RESERVOIRS 
Total 
Tributary Basin and Reservoirs Stream Estimated 
Cost 
Ohio River Basin (Louisville District). (See Section 45 of Text.) 
Great Miami River: 
Brookville, Ind. 1, 8, 9 East Fork of Whitewater River $46,596,000 
Metamora, Ind.2, 4 West Fork of Whitewater River 35,300,000 
Green River: 
Mining City, Ky.2' 5, 7 Green River 69,100,000 
Nolin River, Ky.'. 7' 8 Nolin River 16,216,300 
Barren River, Ky.1 '8 Barren River 28,604,500 
Green River, Ky.1 
' 8 12 Green River 36,577,000 
Rough River, Ky.3 8 Rough River 11,402,100 
Kentucky River: 
Booneville, Ky.1 ' 8 South Fork of Kentucky River 34,200,000 
Buckhorn, Ky.1 ' 8 Middle Fork of Kentucky River 12,270,300 
Licking River: 
Cave Run, Ky. 1' 8,14 Licking River 42,047,000 
Falmouth, Ky.8 Licking River 55,500,000 
Little Miami River: 
Caesar Creek, Ohio 1' 8, 
10 Caesar Creek 35,911,000 
East Fork, Ohio1 ' 8 East Fork of Little Miami River 39,500,000 
Mill Creek: 
West Fork of Mill Creek, Ohio 1' 5 West Fork of Mill Creek 3,092,942 
Wabash River: 
Cagles Mill, Ind.1 ' 8' 13 Mill Creek 4,255,800 
Mansfield, Ind. 1
' 8 Racoon Creek 6,279,800 
Monroe, Ind.' 6,8 Salt Creek 14,836,000 
Wabash River Basin (Louisville District). (See Section 58 of Text.) 
Wabash River: 
Big Blue, Ind. l ' 8 Big Blue River 34,982,000 
Big Walnut, Ind.1' 
8 Big Walnut Creek 40,864,000 
Downeyville, Ind. 8, 15 Flatrock and Little Flatrock Rivers 41,421,000 
Helm, Ill.1' 8,16 Skillet Fork 23,500,000 
Louisville, Ill1.1, 8 Little Wabash River 30,900,000 
1. Details of this project given in individual report. 
2. Also see listing of this project under "Other authorized flood 
control projects." 
3. Part of Rough River Reservoir and channel improvement. Details 
of this project are in individual report. 
4. Estimated cost revised 1963. 
5. Non-Federal cost is $570,801 additional 
6. Includes $8,018,700 non-Federal cost. 
7. Non-Federal cost is $18,195 additional 
8. Estimated cost revised 1969. 
9. Includes $10,021,000 for recreation facilities. 
10. Includes $5,411,000 for recreation facilities. 
11. Includes $1,167,000 non-Federal for recreation facilities. 
12. Includes $3,693,000 for recreation facilities. 
13. Includes $148,000 for recreation facilities 
14. Includes $3,647,000 U. S. Forest Service funds. 
15. Includes $19,821,000 non-Federal. 
16. Includes $8,702,000 reimbursable by non-Federal interests. 
17. Estimated cost revised 1954. 
729 
TABLE 23-G

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 61 of Text) 
Local Protection Projects 
Brevoort Levee, Indiana 
Brookport, Illinois 
Cannelton, Indiana 
Cincinnati, Ohio 
Covington, Kentucky 
Delphi, Indiana 
Evansville, Indiana 
Gill Township Levee, Indiana 
Golconda, Illinois 
Harrisburg, Illinois 
Hawesville, Kentucky 
Indianapolis, Indiana 
Jeffersonville-Clarksville, Indiana 
Lawrenceburg, Indiana 
Lebanon Junction, Kentucky 
Levee Unit #5, Indiana 
Levee Unit #8, Indiana 
Louisville, Kentucky 
Lyford Levee, Indiana 
Mt. Carmel, Illinois 
Muncie, Indiana 
New Albany, Indiana 
Newport, Kentucky 
Niblack Levee, Indiana 
Paducah, Kentucky 
Reevesville-Cache River, Illinois 
Rosiclare, Illinois 
Shawneetown, Illinois 
Sturgis, Kentucky 
Taylorsville, Kentucky 
Tell City, Indiana 
Terre Haute (Conover Levee, Indiana) 
Uniontown, Kentucky 
Vincennes, Indiana 
Fall 
Inspection 1969 
October 
November 
September 
September 
September 
September 
October 
August 
October 
October 
September 
August 
November 
September 
December 
August 
November 
September 
August 
October 
September 
November 
November 
November 
October 
October 
November 
September 
September 
October 
September 
Channel Improvements 
Brazil (Big Walnut Creek), Ind. 
Cypress Creek, Kentucky 
Eel River, Indiana 
English (Little Blue Riv.), Ind. 
Grassy Creek, Indiana 
Harrodsburg (Town Creek), Ky. 
Indian Creek at Corydon, Ind. 
Jackson, Ky. (No. Fork, Ky. Riv.) 
Muscatatuck River, Indiana 
Neon-Fleming, Kentucky 
Panther Creek, Kentucky 
Plum Creek, Kentucky 
Inspection 
September 1969 
May 1970 
February 1966 
November 1969 
November 1969 
August 1969 
September 1969 
August 1969 
November 1969 
July 1969 
November 1968 
August 1969 
730 
TABLE 23-H 
Spring 
Inspection 1970 
June 
June 
May 
April 
April 
April 
May 
April 
May 
May 
May 
April 
June 
April 
June 
June 
April 
July 
April 
June 
April 
May 
April 
June 
June 
June 
May 
May 
June 
June 
May 
April 
May 
June

LOUISVILLE, KY., DISTRICT 
TABLE 23-H (Cont'd) 
INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 61 of Text) 
Channel Improvements Inspection 
Portland, Ind. (Salamonie River) August 1969 
Rough River, Kentucky October 1968 
Salt River, Kentucky August 1969 
Troublesome Creek, Kentucky August 1969 
Whitesburg (No. Fork Ky. River), Ky. July 1969 
Bank Revetments 
Newburgh, Indiana May 1970 
New Harmony Bridge, Wabash River November 1969 
Rockport, Indiana April 1970 
Indiana Hill, Ohio April 1970 
Fiscal Year costs were $39,331. Total costs to 30 June 1970 were $390,203. 
731

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 62 of Text) 
Project 
Aurora, Ohio River Basin, Ind.2 
Bellevue, Ohio River Basin, Ky.2 
Brevoort Levee, Wabash River, Ind. 
Bromley, Ohio River Basin, Ky.2 
Brookport, Ill.3 
California (Cincinnati) Ohio River Basin, 
Ohio 1 
Cannelton, Ohio River Basin, Ind.3 
Carrollton, Ohio River Basin, Ky.1 
Caseyville, Ohio River Basin, Ky. 1 
Cave-in-Rock, Ohio River Basin, Ill.' 
Cincinnati, Ohio River Basin, Ohio3 
Cincinnati (Unit 2) Ohio River Basin, Ohio1 
Cincinnati (Unit 4 remainder) Ohio River 
Basin, Ohio1 
Cleves, Ohio River Basin, Ohio l 
Clinton, Ohio River Basin, Ind. (Wabash 
River)1 
Cloverport, Ohio River Basin, Ky. 1 
Concordia, Ohio River Basin, Ky.1 
Covington, Ohio River Basin, Ky.3 
Deer Creek Prairie Levee, Indiana (Wabash 
River)2 
Delphi, Ohio River Basin, Ind. (Wabash 
River)3 
Derby, Ohio River Basin, Ind.1 
Elizabethtown, Ohio River Basin, Ill.1 
English, Ind. (Little Blue River)3 ,s 
Fletcher and Sunshine Gardens Levee, 
Indiana (Wabash River Basin)' 
Frankfort, Ohio River Basin, Ky. (Kentucky 
River)4 
Gill Township Levee Unit, Indiana (Wabash 
River)3 
Golconda, Ohio River Basin, Ill.3 
Grandview, Ohio River Basin, Ind.2 
Grassy Creek, Jackson County, Ind.3 ' 7 
Harrisburg, Ohio River Basin, Ill. 
Hawesville, Ohio River Basin, Ky. 3 
Honey Creek Levee, Ohio River Basin, Ind. 
(Wabash River)' 
Indian Creek, Corydon, Ind.3' 5 
Jackson, Ky. (Kentucky River Basin) 
Jeffersonville-Clarksville, Ohio River 
Basin, Ind.3 
Lawrenceburg, Ohio River Basin, Ind.3 
Leavenworth, Ohio River Basin, Ind.1 
Lebanon Junction, Ky. 5 
Levee Units I and 2, Eel River, Ohio 
River Basin, Ind. (Wabash River Basin) 
For Last 
Full Report 
See Annual 
Report for 
1954 
1958 
1959 
1957 
1965 
1953 
1965 
1948 
1960 
1953 
1952 
1955 
1964 
1957 
1959 
1953 
1967 
732 
TABLE 23-I 
Cost to June 30, 1970 
Operation & 
Construction Maintenance 
35,420 
12,853 
1,230,873 
597,493 
16,465 
2,068,391 
9,713 
10,150,935 
6,343 
6,848 
7,862,937 
144,563 
372,353 
3,361 
561,200 
565,333 
8,497 
70,304 
870,015 
969,318 
300,143 
130,952 
4,226,361 
2,433,414 
130,417

LOUISVILLE, KY., DISTRICT 
TABLE 23-I (Continued) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 62 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Levee Unit 2, White River, Ind.2 
Levee Unit 3, East Fork of White 
River, Ind.6 
Levee Units 1 and 2, Wabash River, Ill.2 
Levee Units 3 and 4, Wabash River, 111.6 
Levee Unit 6, Ohio River Basin, Ill. 
(Wabash River)2 
Levee Unit 8, White River, Ind.3 
Levee Units 9 and 10, White River, Ind. 1 
Lewisport, Ky. 1 
Louisville, Ohio River Basin, Ky. 3 
Ludlow, Ohio River Basin, Ky.2 
Lyford Levee Unit, Wabash River, Ind.3 
Madison, Ohio River Basin, Ind.1 
Mason J. Niblack Levee, Ohio River Basin, 
Ind. (Wabash River) 3 
Mauckport, Ohio River Basin, Ind.1 
McGinnis Levee, Ohio River Basin, Ind. 
(Wabash River Basin)' 
Metamora Lake, Ohio River Basin, Ind. 
(Great Miami River)2 
Metropolis, Ohio River Basin, I11.2 
Milton, Ohio River Basin, Ky.1 
Mining City Lake, Ohio River Basin, 
Ky. (Green River)' 
Moscow, Ohio River Basin, Ohio2 
Muncie, White River, Ind.3 
Neon-Fleming, Kentucky River, Ky. 3 ,s5 
New Albany, Ohio River Basin, Ind.3 
New Amsterdam, Ohio River Basin, Ind.' 
New Harmony Bridge, Indiana 
New Harmony, Ohio River Basin, Ind., 
(Wabash River)2 
Newport, Ohio River Basin, Ky. 3 
New Richmond, Ohio River Basin, Ohio 1 
Owensboro, Ohio River Basin, Ky.2 
Paducah, Ohio River Basin, Ky. 3 
Patriot, Ohio River Basin, Ind.1 
Portland, Salamonie River, Ind.3 ',5s 
Prestonville, Ohio River Basin, Ky.1 
Raccoon Creek Levee, Ind. (Wabash River) 1 
Reevesville, Ohio River Basin, Ill. 
(Cache River) 3 
Rising Sun, Ohio River Basin, Ind.1 
Rockport, Ohio River Basin, Ind.2 
Rome, Ohio River Basin, Ind.1 
Rosiclare, Ill. (Ohio River)3 
Russell and Allison Levee, Illinois 
(Wabash River)2 
1938 
1938 
1938 
1952 
1939 
1962 
1944 
1965 
1950 
1956 
1963 
1957 
1959 
1959 
1959 
1962 
1954 
1954 
275 
216 
9,975 
700,534 
24,681,896 
14,503 
267,391 
1,554,712 
71,049 
10,575 
350,474 
887,835 
86,532 
5,375,471 
297,624 
7,512,987 
7,104 
4,761,552 
237,657 
600,300 
622,544 
10,325 
733 
451-584 0-72-47

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 23-I (Continued) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 62 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Salyersville, Licking River, Ky.2 1946 12,000 
Shawneetown, Ohio River Basin, 11.2 
Shoals, East Fork of White River, Ind.1 1938 - 
Shufflebarger Levee, Ohio River Basin, Ind. 
(Wabash River Basin)' 1950 64,487 
Smithland, Ohio River Basin, Ky.1 
Sugar Creek Levee, Ohio River Basin, Ind. 
(Wabash River Basin)' 1961 28,061 
Taylorsville, Ohio River Basin, Ky. (Salt 
River)3 1952 373,050 
Tell City, Ohio River Basin, Ind.3 1956 932,229 
Terre Haute (Conover Levee), Ind. 
(Wabash River)3 1965 14,913 - 
Tolu, Ohio River Basin, Ky.1 
Town Creek, Harrodsburg, Ky.s 1967 56,505 
Troy, Ohio River Basin, Ind.1 
Uniontown, Ohio River Basin, Ky.3 1956 1,070,926 
Utica, Ohio River Basin, Ind.1 
Vevay, Ohio River Basin, Ind. 1 
Vincennes, Ind.7 1964 3,308,940 
West Point, Ohio River Basin, Ky.1 - 4,490 
Westport, Ohio River Basin, Ky.1 
Wilder, Ohio River Basin, Ky.2 5,165 
1. Inactive. 5. Authorized by Chief of Engineers under Sec. 205, 1948 
2. To be restudied. Flood Control Act as amended. 
3. Completed. 6. Awaiting local cooperation. 
4. Deferred portion of project. For active portion, see indi- 7. Partially completed to form a useful unit. Remaining 
vidual report. portion of project awaiting local cooperation. 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
TABLE 23-J. (See Section 63 of Text) 
Fiscal Year Cost 
Flood Control: 
Eldorado, Ill. (Eldorado Ditch)1 $ 1,800 
Marengo, Ind. (Whiskey Run & Brandy Wine Fork)' 2,500 
Rushville, Ind. (Flatrock River)2 227 
Sidney, Ohio (Miami River)2 5,568 
Tell City, Ind. (Ohio River - Windy Creek)' 2,000 
Snagging and Clearing for Flood Control: 
Millstone, Ky. (Boone and No. Fk. Ky. River)' 3,650 
Hodgenville, Ky. (N. Fork Nolin River)4 824 
Emergency Bank Protection: 
Sparksville, Ind. (E. Fk. White River)' 1,900 
Newburgh, Ind. (Ohio River)3 48,664 
Owensboro, Ky. (Ohio River) 200 
Rough River near Dundee, Ky.4 660 
1. Reconnaissance Report. 
2. Detailed project report. 
3. Construction completed. 
4. Construction funds received. 
734

HUNTINGTON, W. VA., DISTRICT* 
This district comprises central and southeastern 
Ohio, all but northern panhandle and northeastern 
portion of West Virginia, eastern Kentucky, a portion 
of midwestern Virginia, a very small portion of 
northwestern North Carolina, embraced in drainage 
basin of Ohio River and its tributaries from about mile 
127 (below Pittsburgh, Pa.) to mile 438, immediately 
upstream from Foster, Ky. 
IMPROVEMENTS 
Navigation Page 
1. Construction of locks and dams on 
Ohio River ... ....................... 736 
2. Kanawha River, W. Va ................... 736 
3. Open-Channel Work, Ohio River ....... 736 
4. Other authorized navigation projects .... 736 
Flood Control 
5. Alum Creek Lake, Ohio ...................... 736 
6. Athens, Ohio ............ ....................... . 737 
7. Beech Fork Lake, W. Va ................ 737 
8. Bluestone Lake, Ohio River Basin, W. 
V a ........................................................... 73 7 
9. Burnsville Lake, Ohio River Basin, W. 
V a .............. ..................... ......... 737 
10. Deer Creek Lake, Ohio River Basin, 
Ohio .. .............................. 738 
11. Delaware Lake, Ohio River Basin, 
Ohio .... .......................... 738 
12. Dewey Lake, Ohio River Basin, Ky. ... 739 
13. Dillon Lake, Ohio River Basin, Ohio .. 739 
14. East Lynn Lake, Ohio River Basin, W. 
V a . .............................. 740 
15. Fishtrap Lake, Ohio River Basin, Ky. 740 
16. Grayson Lake, Ky. ................................ 741 
17. John W. Flannagan Dam and 
Reservoir, Ohio River Basin, Va. ..... 741 
18. Kehoe Lake, Ky . .................... 741 
19. Martin, Ky. ..................................... 742 
20. M assillon, Ohio ......... .......................... 742 
21. Middle Fork of Mud River, W. Va.... 742 
22. Mill Creek Lake, Ohio ........................ 743 
23. Muskingum River Dams and Lakes, 
Ohio .............................. ........ 743 
Flood Control (cont.) Page 
24. Newark, Ohio ........................................ 744 
25. North Branch of Kokosing Lake, Ohio 744 
26. North Fork of Pound Lake, Va ............ 744 
27. Ohio River Basin (Huntington District) 745 
28. Paint Creek Lake, Ohio River Basin, 
Ohio ............................... ....... 745 
29. Paintsville Lake, Ky. ............................... 745 
30. R. D. Bailey Lake, W. Va. ............... 745 
31. Rockcastle Creek, Inez, Ky. ............ 746 
32. Roseville, Ohio .......... .......................... 746 
33. Salt Creek Lake, Ohio ...................... 746 
34. South Williamson, Ky. ........................... 747 
35. Summersville Lake, Ohio River Basin, 
W . V a . ....................... ....................... 747 
36. Sutton Lake, Ohio River Basin, W. 
V a . ........................................................... 74 7 
37. Tom Jenkins Dam, Ohio River Basin, 
O h io ........................................................ 748 
38. Utica Lake, Ohio ..................................... 748 
39. West Fork Lake, Ohio River Basin, W. 
Va. ........................................ ....... 748 
40. Yatesville Lake, Ky. ................................ 749 
41. Inspection of completed flood control 
projects ............................................. 749 
42. Other authorized flood control projects 749 
43. Flood control work under special 
authorization .. ...................... 749 
44. 
45. 
46. 
General Investigations 
Surveys ......................... ......................... 749 
Collection and study of basic data ....... 750 
Research and development .............. 750 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
735

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
NAVIGATION 
1. CONSTRUCTION OF LOCKS AND 
DAMS ON OHIO RIVER 
See this heading under Ohio River portion. 
2. KANAWHA RIVER, W. VA. 
Location. River is 97 miles long, formed by junction of 
New and Gauley Rivers, a short distance above 
Kanawha Falls, W. Va., flows generally northwesterly 
and empties into Ohio River at Point Pleasant, W. Va. 
Previous projects. For details see pages 90-98 of Annual 
Report for 1875, page 1913 of Annual Report of 1915, 
and page 1309 of Annual Report for 1938. 
Existing project. Three dams on Kanawha River with 
twin locks having usable dimensions of 56 by 360 feet, 
and one dam on Ohio River near Gallipolis, Ohio, with 
one lock 110 by 600 feet and one lock 110 by 360 feet, to 
furnish a 9-foot navigable depth from mouth to a point 
90.57 miles above. For authorization of existing project 
see page 1152 of Annual Report for 1962. New work for 
existing project as completed cost $22,872,770. 
Local cooperation. None required. 
Licenses. Under licenses issued by Federal Power 
Commission, the Kanawha Valley Power Corp. 
constructed hydroelectric plants at the three locks and 
dams on Kanawha River. License charges under 
License No. 1175 for London and Marmet Locks and 
Dams are $32,000 annual fee and. $1,056,000 cumulative 
collections through CY 1969 for each 
installation, and for Winfield Locks and Dam, License 
No. 1290, are $40,000 annual charge and $3,392,000 
cumulative collections through CY 1969. 
Terminal facilities. There are 77 terminals from 30 
miles east of Charleston, W. Va., to the mouth. 
Terminals are constructed principally of steel and 
wood mooring piles and steel sheet pile mooring cells. 
Fifteen of these terminals have railroad connections. 
One terminal, paved wharf, is owned by city of 
Charleston. Remaining terminals are privately owned. 
Principal commodities handled are coal, chemicals, 
acids, cement, gasoline and oil, and sand and gravel. 
For further information see Annual Report for 1962, 
page 1152. 
Operations and results during fiscal year. Operations and 
maintenance, general: Locks and dams were operated 
as required and necessary repairs and improvements 
were made thereto, and to appurtenant structures and 
grounds. Channel inspections were conducted periodically. 
Condition at end of fiscal year. Construction of project 
began in 1931 and was completed in 1937. All 
structures are in operation and available depth for 
navigation is 9 feet from mouth of river to head of 
improvement. Above improved portion of river, minimum 
depth in channel is less than I foot. For details of 
locks and dams see page 1153 of Annual Report for 
1962. (See Table 24-B for total cost of existing project 
to June 30, 1970.) 
3. OPEN-CHANNEL WORK, OHIO RIVER 
See this heading under Ohio River portion. 
4. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table C. 
FLOOD CONTROL 
5. ALUM CREEK LAKE, OHIO 
Location. Damsite is in Delaware County, Ohio, on 
Alum Creek, a tributary of Big Walnut Creek, 26 miles 
above mouth of Alum Creek and 15 miles north of 
Columbus, Ohio. 
Existing project. Provides for construction of a rolled 
earth-fill dam 93 feet high and 10,000 feet long with a 
gate controlled spillway located in right abutment. 
Reservoir will provide a total storage of 134,800 acrefeet; 
control a drainage area of 123 square miles; and 
necessitate relocation or reconstruction of 15.0 miles of 
highways, 12.1 miles of power lines, 9.6 miles of 
telephone lines, two oil and gas transmission lines and 6 
cemeteries containing 2,024 graves. Reservoir will be 
operated as a unit of coordinated reservoir system for 
protection of Columbus, Ohio, lower Alum Creek and 
Scioto and Ohio Valleys, generally. Project authorized 
for construction under 1962 Flood Control Act. Total 
estimated cost of new work (1970) is $46,200,000, 
which is to be appropriated and expended by the 
Government. The sponsor will reimburse the Government 
$24,580,000, exclusive of interest, for costs 
allocated to water supply. 
Local cooperation. Non-Federal interests must operate 
and maintain proposed fish and wildlife recreation 
facilities; reimburse Federal Government for cost of 
water supply feature, presently estimated at $24,580, 
000, exclusive of interest; and pay for operation and 
maintenance of water supply facilities, estimated to be 
$30,900 annually. The State of Ohio has expressed its 
intent to operate, maintain and further develop all 
recreation facilities. 
Operations and results during fiscal year. New work: 
Contract for relocation of Cemeteries, Part I awarded 
in April 1970, was initiated and completed. Plans and 
specifications for dam were completed. Engineering 
studies were continued. Acquired 26 tracts of land. 
Condition at end of fiscal year. Initial construction 
contract, Relocation of Cemeteries Part I, is complete. 
Plans and specifications for dam are complete. Engineering 
studies were continued. Acquired 34 of 314 
tracts of land required for the project. 
736

HUNTINGTON, W. VA., DISTRICT 
6. ATHENS, OHIO 
Location. In Athens County, Ohio, on Hocking River, 
about 37 miles above confluence with Ohio River. 
Existing project. Provides for clearing and excavating 
about 26,000 linear feet of a new channel for Hocking 
River; install culverts and flap valves; and construct 
gate well, outlet and inlet structures. Project will 
reduce average annual damages at Athens by 86 
percent. Total estimated cost of new work (1970) is $8, 
210,000. Federal cost is $5,200,000 and non-Federal 
cost is $3,010,000 for lands and damages and utility 
relocations. Project was authorized by 1965 Flood 
Control Act (H. Doc. 287, 89th Cong.). 
Local cooperation. Responsible local interests must 
provide lands, easements, and rights-of-way; hold the 
United States free from damages; maintain project 
after completion; provide necessary relocations; and 
prevent any encroachments on capacities of channel 
within limits of project. All local requirements were 
met prior to initiating construction. 
Operations and results duringyear. Contract for complete 
project awarded February 20, 1969, is 64 percent 
complete. 
Condition at end offiscalyear. Contract work initiated in 
March 1969, was 64 percent complete. 
7. BEECH FORK LAKE, W. VA. 
Location. Damsite is in Wayne County, W. Va., on 
Beech Fork Creek, a tributary of Twelvepole Creek, 3.7 
miles above mouth of Beech Fork Creek and 19.6 miles 
above confluence of Twelvepole Creek and the Ohio 
River. 
Existing project. Provides for construction of a rolled 
earth-fill dam about 86 feet high and 1,080 feet long; 
an uncontrolled spillway landward from left abutment 
of dam; and an outlet tunnel through left abutment of 
dam with control structure at upstream end. Reservoir 
will provide for a total storage of 37,540 acre-feet, 
control a drainage area of 78 square miles and 
necessitate construction of 5.1 miles of telephone and 
power lines, 9.2 miles of pipe lines, 2.69 miles of State 
roads, 1 school, and 41 cemeteries containing about 1, 
690 graves. Reservoir will be operated as a unit of 
coordinated reservoir system for protection of Lavalette, 
W. Va., and Twelvepole and Ohio Valleys, 
generally. Existing project was authorized under 1962 
Flood Control Act. Estimated Federal cost of new work 
(1970) is $21,800,000. 
Local cooperation. None required by law. 
Operations and results during fiscal year. New Work: 
Contract for construction of access-by pass road, 
awarded June 1970, and work advanced to 5 percent 
completion. Contract for Cemetery Relocation, Plan I, 
initiated in May 1970 advanced to 67 percent 
completion. Engineering studies were continued. Thirty-
one tracts of land acquired. 
Condition at end of fiscal year. Initial construction 
contract, construction of access-by pass road, was 5 
percent complete. Cemetery relocation, Plan I, was 67 
percent complete. Acquired 39 of 465 tracts of land 
required for project. Engineering studies were continued. 
8. BLUESTONE LAKE, OHIO RIVER 
BASIN, W. VA. 
Location. Dam is on New River in Summers County, 
W. Va., about 2.5 miles above Hinton, W. Va., and 1 
mile above confluence of New and Greenbrier Rivers. 
Reservoir is in Summers County, W. Va., and Giles 
County, Va. 
Existing project. A concrete gravity dam with a 
maximum height of 180 feet and an overall length of 2, 
048 feet, consisting of 790 feet of spillway section, 330 
feet of powerhouse intake structure, and 928 feet of 
nonoverflow sections and abutments. Reservoir extends 
about 36 miles upstream from dam and provides for 
gross storage of 631,000 acre-feet. Estimated Federal 
cost of project is $29,190,501. Existing project was 
authorized by Flood Control Acts of June 22, 1936, and 
June 28, 1938. For further details see page 1453 of 
Annual Report for 1939, and pages 1173 and 1174 of 
Annual Report for 1962. 
Local cooperation. None required by law. 
Operations and results during fiscal year. Operations and 
Maintenance, General: Reservoir was operated for 
benefit of flood control as required, and necessary 
repairs were made to structures and appurtenances. 
Facilities for accommodation and protection of visiting 
public were maintained in good condition. 
The rise of December 1969-January 1970 resulted 
in the storage of 147,260 acre-feet of water in the 
reservoir. Kanawha River at Kanawha Falls crested at 
18.6 feet, Kanawha River at Charleston (old Lock 6) 
crested at 33.7 feet and Kanawha River at Winfield 
(lower) crested at 38.8 feet. The reductions effected by 
the reservoir were 3.1 feet at Kanawha Falls, 4.6 feet at 
Charleston (old Lock 6) and 2.6 feet at Winfield 
(lower). The project prevented flood damages of an 
estimated $24,321,000 during fiscal year. 
Condition at end of fiscal year. Dam is complete and 
reservoir is in operation as a unit of coordinated 
reservoir system for protection of New, Kanawha and 
Ohio Valleys, generally. Construction of dam was 
initiated in January 1942 and completed in April 1952. 
Total land acquired was 21,921 acres in fee and 
flowage easements over 546 acres. 
9. BURNSVILLE LAKE, OHIO RIVER 
BASIN, W. VA. 
Location. Damsite is in Braxton County, W. Va., on 
Little Kanawha River 1.7 miles above Burnsville, W. 
Va., and 124.19 miles above confluence of Little 
Kanawha and Ohio Rivers. 
737

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Existing project. Provides for construction of an earth 
embankment dam approximately 80 feet high and 1, 
000 feet long with a gated spillway at the left abutment 
of dam. The outlet works will be an integral part of the 
spillway, comprised of 5 sluices and one low flow sluice. 
Reservoir will provide for a total storage of 65,400 acrefeet, 
control a drainage area of 165 square miles and 
necessitate relocation of 6.12 miles of State roads; 6.85 
of power and telephone lines, 2 schools and 14 
cemeteries containing 1,336 graves. Reservoir will be 
operated as a unit of coordinated reservoir system for 
protection of town of Burnsville and Little Kanawha 
and Ohio Valleys generally. Existing project selected 
for construction under general authorization for Ohio 
River Basin in 1938 Flood Control Act. Estimated 
Federal cost of new work (1970) is $33,700,000. 
Local cooperation. None required by law. 
Operations and results during fiscal year. Engineering 
studies were continued. Real estate acquisition authorized 
and 17 tracts of land acquired. 
Condition at end of fiscal year. Engineering studies 
continued. Acquired 17 of 266 tracts of land required 
for the project. 
10. DEER CREEK LAKE, OHIO RIVER 
BASIN, OHIO 
Location. Dam is in Pickaway County, Ohio, on Deer 
Creek, a tributary of Scioto River, 21.0 miles above 
mouth of Deer Creek and 105.8 miles above mouth of 
Scioto River. 
Existing Project. A rolled earth-fill dam 93 feet high 
and 3,880 feet long, with a 741-foot concrete gravity 
channel section; a gated spillway in channel section 
controlled by three 42- by 32-foot tainter gates; outlet 
works consisting of five 5- by 5.5-foot gated sluices 
through concrete spillway section discharging into 
stilling basin; and an earth dike 15 by 4,600 feet in a 
saddle 3.8 miles southwest of dam site. Reservoir 
provides a total storage of 102,540 acre-feet and 
controls a drainage area of 278 square miles. For 
further project details see Annual Report for 1965, 
page 939. Existing project was selected for construction 
under general authorization for Ohio River Basin in 
1938 Flood Control Act. Estimated Federal cost for 
new work is $19,600,000. 
Local Cooperation. Non-Federal interests must operate 
and maintain proposed fish and wildlife facilities. The 
State of Ohio has expressed its intent to operate, 
maintain and further develop all recreation facilities. 
Operations and results during fiscal year. New work: 
Contract for construction of buildings, grounds and 
utilities, awarded May 1969, was completed. Contract 
for construction of recreational facilities, Part II, 
awarded August 1969, was initiated and advanced to 
65 percent completion. Planning for remaining recreational 
facilities continued. 
Operation and maintenance, general: Reservoir was 
operated for flood control, as required, and necessary 
repairs were made to structures and appurtenances. 
The rise of April 1970 resulted in the storage of 20, 
400 acre-feet of water in the reservoir. Deer Creek at 
Williamsport, Ohio crested at 12.1 feet, Scioto River at 
Chillicothe crested at 15.6 feet, Scioto River at Higby 
crested at 18.7 feet and Scioto River at Piketon USWB 
crested at 24.2 feet. The reductions effected by the 
reservoir were 0.5 feet at Williamsport, 0.4 feet at 
Chillicothe, 0.5 feet at Higby and 0.6 feet at Piketon 
USWB. The second rise of April 1970 resulted in the 
storage of 6,150 acre-feet of water in the reservoir. Deer 
Creek at Williamsport, Ohio crested at 7.9 feet, Scioto 
River at Chillicothe crested at 12.4 feet, Scioto River at 
Higby crested at 16.0 feet and Scioto River at Piketon 
USWB crested at 20.5 feet. The reductions effected by 
the reservoir were 1.7 feet at Williamsport, and 0.1 feet 
at Chillicothe, Higby and Piketon USWB, respectively. 
The project prevented flood damages of an estimated 
$309,000 during fiscal year. 
Condition at end of fiscal year. All major construction 
work complete. Remaining work consists of construction 
of recreational facilities: Part II construction 
is 65 percent complete and planning for final phase of 
recreational construction is 80 percent complete. 138 
tracts of land required for the project have been 
acquired. 
11. DELAWARE LAKE, OHIO RIVER 
BASIN, OHIO 
Location. Dam is on Olentangy River about 6 miles 
above and north of Delaware, Ohio, and 32 miles 
above confluence of Olentangy and Scioto Rivers at 
Columbus, Ohio. Reservoir is in Delaware, Marion, 
and Morrow Counties, Ohio. 
Existing project. A rolled-earthfill dam having a gate 
controlled gravity ogee-type spillway in channel 
containing five outlet conduits. Dam is about 18,600 
feet long, having a maximum height of 92 feet. 
Completed project provides for storage of 132,800 acrefeet 
from a tributary drainage area of 381 square miles. 
For further details see Annual Report for 1962, page 
1160. Existing project was authorized by 1938 Flood 
Control Act. Federal cost of project as completed was 
$7,631,821. 
Local cooperation. None required by law. 
Operations and results during fiscal year. Operation and 
maintenance, general: Reservoir was operated for 
benefit of flood control, as required, and necessary 
repairs were made to structures and appurtenances. 
The first rise of April 1970 resulted in the storage of 
11,170 acre-feet of water in the reservoir. The Scioto 
River at Columbus, Ohio, USWB gage crested at 7.5 
feet and the reduction effected by the reservoir was 0.2 
feet. The second rise of April 1970 resulted in the 
storage of 13,100 acre-feet of water in the reservoir. The 
Scioto River at Columbus, Ohio, USWB gage crested 
738

HUNTINGTON, W. VA., DISTRICT 
at 6.3 feet and the reduction effected by the reservoir 
was 0.4 feet. Another noteworthy rise occurred in June 
1970 and resulted in the storage of 21,280 acre-feet of 
water in the reservoir. The Scioto River at Columbus, 
Ohio, USWB gage crested at 5.4 feet and the reduction 
effected by the reservoir was 1.7 feet. The project 
prevented flood damages of an estimated $1,365,000 
during the fiscal year. 
Condition at end of fiscal year. Dam and its appurtenances 
are complete and reservoir is in operation 
as a unit of coordinated reservoir system for protection 
of Olentangy, Scioto, and Ohio Valleys, generally. 
Construction of dam was started in April 1946 and 
completed in July 1948. All construction operations 
were completed in October 1951. Total real estate 
requirements were completed which include acquisition 
of 7,703 acres in fee and flowage easements 
over 2,428 acres. 
12. DEWEY LAKE, OHIO RIVER BASIN, 
KY. 
Location. Dam is on Johns Creek, about 7 miles 
southeast of Paintsville, Ky., and 5.4 miles above 
confluence of Johns Creek and Levisa Fork of Big 
Sandy River. 
Existing project. A rolled-earthfill dam having a 
maximum height of 118 feet and a total length of 913 
feet; controlled outlet works discharging through a 
tunnel in left abutment; an uncontrolled spillway 
discharging through a channel excavated in left or west 
abutment; and a rolled-earthfill dike which blocks a 
low divide to Brandykeg Creek and Levisa Fork. 
Reservoir provides storage of 93,300 acre-feet, and 
controls a drainage area of 207 square miles. For 
further project details see Annual Report for 1965, 
page 940. Existing project was selected for construction 
under general authorization for Ohio River Basin in 
1938 Flood Control Act. Estimated Federal cost is $6, 
881,283. 
Local cooperation. None required by law. 
Operations and results during fiscal year. New work: 
Acquired 27 acres of land for expansion of recreational 
facilities under the completed projects program. 
Operations and maintenance, general: Reservoir was 
operated for benefit of flood control, as required, and 
necessary repairs were made to structures and appurtenances. 
Facilities or accommodation and protection 
of visiting public were maintained in good 
condition. 
The rise of December 1969-January 1970 resulted 
in the storage of 16,800 acre-feet of water in the 
reservoir. The Levisa Fork at Paintsville, Ky., gage 
crested at 29.6 feet and the Big Sandy River at Louisa 
crested at 40.0 feet. The reductions effected by the 
reservoir were 2.4 feet at Paintsville and 0.7 feet at 
Louisa. Another noteworthy rise occurred in February 
1970 and resulted in the storage of 16,250 acre-feet of 
water in the reservoir. The Levisa Fork at Paintsville, 
Ky., gage crested at 28.3 feet and the Big Sandy River 
at Louisa crested at 38.5 feet. The reductions effected 
by the reservoir were 3.0 feet at Paintsville and 0.3 feet 
at Louisa. Another noteworthy rise occurred in April 
1970 and resulted in the storage of 22,000 acre-feet of 
water in the reservoir. The Levisa Fork at Paintsville, 
Ky., gage crested at 29.5 feet and the Big Sandy River 
at Louisa crested at 37.8 feet. The reductions effected 
by the reservoir were 2.3 feet at Paintsville and 1.4 feet 
at Louisa. The project prevented flood damages of an 
estimated $150,000 during the fiscal year. 
Condition at end of fiscal year. Dam is complete and is 
being operated as a unit of coordinated reservoir system 
for protection of Levisa Fork, Big Sandy and Ohio 
Valleys, generally. Construction of dam was initiated 
in March 1946 and completed in July 1949. All 
construction is complete. Total acreage involved has 
been acquired and consists of 12,437 acres in fee and 
flowage easements over 1,165 acres. 
13. DILLON LAKE, OHIO RIVER BASIN, 
OHIO 
Location. Dam is on Licking River, Ohio, 5.8 miles 
above confluence of Licking and Muskingum Rivers at 
Zanesville, Ohio. 
Existing project. A rolled-earthfill dam with a maximum 
height and length of 118 and 1,400 feet, 
respectively; contiolled-outlet works discharging 
through a 20-foot conduit in right abutment; and 
ungated 280-foot spillway adjacent to left abutment of 
dam; and two rolled earthfill dikes. Reservoir provides 
for storage of 261,110 acre-feet and controls an area of 
748 square miles. For further project details see Annual 
Report for 1962, page 1162. Existing project was 
selected for construction under general authorization 
for Ohio River Basin in 1938 Flood Control Act. 
Estimate of Federal cost for new work is $30,218,235. 
Local cooperation. None required by law. 
Operations and results during fiscal year. Operations and 
maintenance, general: Reservoir was operated for 
benefit of flood control, as required, and necessary 
repairs were made to structures and appurtenances. 
The flood of July 1969 resulted in the storage of 17,430 
acre-feet of water in the reservoir. This storage, 
however, did not synchronize with the crest stages at 
Zanesville and McConnelsville, therefore, no reductions 
were effected by the reservoir during this 
flood. The first rise of April 1.970 resulted in the storage 
of 47,530 acre-feet of water in the reservoir. The 
Muskingum River crested at 17.2 and 9.2 feet at 
Zanesville and McConnelsville, respectively. Reductions 
effected by the reservoir were 3.3 and 2.2 feet 
at Zanesville and McConnelsville, respectively. The 
second rise of April 1970 resulted in the storage of 39, 
180 acre-feet of water in the reservoir. The Muskingum 
River crested at 16.7 and 10.9 feet at Zanesville and 
McConnelsville, respectively. Reductions effected by 
the reservoir were 2.5 and 1.0 feet at Zanesville and 
739

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
McConnelsville, respectively. The project prevented 
flood damages of an estimated $2,012,000 during the 
fiscal year. 
Condition at end of fiscal year. Dam is complete and 
reservoir is in operation as a unit of coordinated 
reservoir system for protection of Zanesville, Ohio, and 
Muskingum and Ohio Valleys, generally. Construction 
of project was initiated in July 1946 with relocation of 
Baltimore and Ohio Railroad in reservoir. Total 
acreage involved has been acquired and consists of 7, 
797 acres in fee and flowage easements over 5,282 
acres. 
14. EAST LYNN LAKE, OHIO RIVER 
BASIN, W. VA. 
Location. Damsite is in Wayne County, W. Va., on 
East Fork on Twelvepole Creek, 10 miles above mouth 
of East Fork and 42 miles above confluence of 
Twelvepole Creek and Ohio River. 
Existing project. Provides for construction of an 
earthfill dam having a maximum height of 113 feet, top 
length of 638 feet and top width of 32 feet; an 
uncontrolled spillway with a crest length of 230 feet 
near left abutment; and a 13-foot reinforced tunnel in 
right abutment with control structure at upstream end. 
Reservoir will provide for a total storage of 82,500 acrefeet, 
from a drainage area of 133 square miles, and will 
necessitate relocation or reconstruction of 13.3 miles of 
state roads; 15.5 miles of powerlines; 10.6 miles of 
telephone lines; 27.8 miles of gas lines; 34 cemeteries 
containing approximately 2,460 graves; and construction 
of one school building. Reservoir will be 
operated as a unit of coordinated reservoir system for 
protection of towns of East Lynn and Wayne, W. Va., 
and Twelvepole Creek and Ohio River Valleys, 
generally. Existing project selected for construction 
under general authorization for Ohio River Basin in 
Flood Control Act of 1938. Estimated Federal cost for 
new work (1970) is $25,800,000. 
Local cooperation. None required by law. 
Operations and results during fiscal year. New work: 
Contract for construction of dam and spillway, 
awarded July 1968, is 95 percent complete; relocation 
of Rte. 37, Part II, awarded October 1969, is 13 percent 
complete; reservoir clearing, awarded March 1970, is 
38 percent complete; cemetery relocation, Part III, 
awarded in June 1969, was completed; and relocation 
of utilities by five companies is 50 percent complete. 
Planning continued on recreational facilities to be 
constructed. Acquired 37 tracts of land. Operation and 
Maintenance, General: Operation and maintenance 
activities were initiated in February 1970 on the 
partially completed project, and the project prevented 
flood damages of an estimated $611,000 during the 
fiscal year. 
Condition at end offiscalyear. Contracts for construction 
of outlet works, Rte. 37 Part I, cemeteries Parts I, II 
and III and recreation access road are complete. 
Contracts for construction of dam and spillway, 95 
percent complete; Rte. 37 Part III, 13 percent 
complete; utility relocation, 50 percent complete; and 
clearing 38 percent complete. 547 surface tracts 
required for project were acquired. 
15. FISHTRAP LAKE, OHIO RIVER 
BASIN, KY. 
Location. Dam is on Levisa Fork in Pike County, Ky., 
about 2.6 miles above confluence of Levisa and Russel 
Forks, and 103 miles above mouth of Levisa Fork. 
Existing project. A rockfill dam with a maximum 
height of 195 feet, an overall length of 1,100 feet, and 
top width of 32 feet. An excavated spillway is located at 
left abutment and controlled by four 57- by 35-foot 
tainter gates. Reservoir provides for a total storage of 
164,360 acre-feet and control a drainage area of about 
395 square miles. Its construction required abandonment 
of 17.7 miles of branch line of one railroad 
and raising and relocation of about 4.3 miles of track of 
another railroad. Other relocations are: 37.8 miles of 
roads; 8.5 miles of telephone lines; 13.5 miles of 
powerlines; 2.1 miles of gas pipelines; and 48 cemeteries 
containing about 2,300 graves. Reservoir will be 
operated as a unit of coordinated reservoir system for 
protection of Levisa Fork and Big Sandy River Valleys, 
generally, and to a lesser degree, Ohio River Valley. 
Existing project was selected for construction under 
general authorization for Ohio River Basin in 1938 
Flood Control Act. Estimate of Federal cost for new 
work (1970) is $53,900,000. 
Local cooperation. None required by law. 
Operations and results during fiscal year. New work: 
Contract for raising existing C & O Railroad in upper 
end of reservoir advanced to 97 percent completion. 
Plans completed for construction of buildings, grounds 
and utilities. Planning for construction of recreational 
facilities continued. Operation and Maintenance, 
General: Reservoir was operated for benefit of flood 
control as required and necessary repairs were made to 
structures and appurtenances. 
The rise of December 1969-January 1970 resulted in 
the storage of 26,000 acre-feet of water in the reservoir. 
The Levisa Fork at Pikeville crested at 31.9 feet and the 
reduction effected by the reservoir was 6.4 feet. 
Another noteworthy rise occurred in February 1970 
and resulted in the storage of 24,060 acre-feet of water 
in the reservoir. The Levisa Fork at Pikeville crested at 
25.4 feet and the reduction effected by the reservoir was 
7.1 feet. Another noteworthy rise occurred in April 
1970 and resulted in the storage of 27,900 acre-feet of 
water in the reservoir. The Levisa Fork at Pikeville 
crested at 29.0 feet and the reduction effected by the 
reservoir was 6.8 feet. The project prevented flood 
damages of an estimated $1,286,000 during the fiscal 
year. 
Condition at end of fiscal year. All construction contracts 
are complete except construction of buildings, grounds 
740

HUNTINGTON, W. VA., DISTRICT 
and utilities, and construction of recreational facilities. 
Entire project 97 percent complete. 1,293 tracts of land 
of 1,307 required for the project, acquired. 
16. GRAYSON LAKE, KY. 
Location. Dam is on Little Sandy River, Ky., 48.5 
miles above its confluence with Ohio River and 11 
stream miles above town of Grayson, Ky. 
Existing project. A random earthfill dam with a 
maximum height of 120 feet and a total crest length of 
1,460 feet; controlled outlet works discharging through 
a 14-foot diameter horseshoe tunnel in left abutment; 
and an uncontrolled 200-foot spillway beyond left 
abutment. Reservoir provides for total storage of 119, 
000 acre-feet; controls a drainage area of 196 square 
miles, and necessitated relocation or reconstruction of 
14.9 miles of roads, 17.6 miles of powerlines, 2.6 miles of 
telephone lines, about 0.06 miles of gaslines, and 47 
cemeteries having about 1,200 graves. Reservoir will be 
operated as a unit of coordinated reservoir system for 
protection of Grayson, Ky., and Little Sandy and Ohio 
River Valleys generally. Existing project was selected 
for construction under general authorization for Ohio 
River Basin in 1960 Flood Control Act. Estimate of 
Federal cost for new work is $18,555,000. 
Local cooperation. None required by law. 
Operations and results during fiscal year. New work: All 
major construction and relocation work is complete. 
Planning continued for construction of recreational 
facilities; contract for construction of operator's quarters 
awarded October 1968, is complete. Operation and 
maintenance, general: Reservoir was operated for 
benefit of flood control, as required, and necessary 
repairs were made to structures and appurtenances. 
The rise of December 1969-January 1970 resulted 
in the storage of 12,900 acre-feet of water in the 
reservoir. Little Sandy River at Grayson crested at 16.8 
feet and the reduction effected by the reservoir was 8.5 
feet. The rise of February 1970 resulted in the storage of 
9,280 acre-feet of water in the reservoir. Little Sandy 
River at Grayson crested at 16.7 feet and the reduction 
effected by the reservoir was 8.0 feet. The rise of April 
1970 resulted in the storage of 15,100 acre-feet of water 
in the reservoir. Little Sandy River at Grayson crested 
at 18.6 feet and the reduction effected by the reservoir 
was 11.2 feet. The project prevented flood damages of 
an estimated $492,000 during the fiscal year. 
Condition at end of fiscal year. All major items of 
relocation and construction work are complete. Contract 
for construction of Operator's quarters is complete. 
Planning for construction of recreational facilities, 
under completed projects program, continued. 
482 tracts of land of 483 required for project have been 
acquired. 
17. JOHN W. FLANNAGAN DAM AND 
RESERVOIR, OHIO RIVER BASIN, VA. 
Location. Dam is on Pound River in Dickenson 
County, Va., about 1.8 miles above confluence of 
Russel Fork and Pound River and 150 miles above 
mouth of Big Sandy River. 
Existing project. A rockfill dam having a maximum 
height of 252 feet, top length of 970 feet, and top and 
base width of 30 and 1,030 feet, respectively. Outlet 
tunnel located near left abutment with control structure 
at upstream end. A spillway controlled by six 
tainter gates is constructed in a saddle about 0.3 mile 
upstream from damsite. Reservoir provides for about 
145,700 acre-feet of storage and controls about 222 
square miles of drainage area. For further details see 
Annual Report for 1966, page 1024. Existing project 
was selected for construction under general authorization 
for Ohio River Basin in 1938 Flood Control 
Act. Project was modified, after construction began to 
provide water quality control features by adding 
control gates to previously uncontrolled spillway, thus 
increasing total storage capacity by about 39,000 acrefeet. 
Estimated Federal cost for new work (1970) is $19, 
880,500. 
Local cooperation. None required by law. 
Operations and results during fiscal year. New work: All 
major construction complete. Planning for construction 
of a portion of recreational facilities, under 
completed projects program, was completed. One tract 
of land acquired. Operation and maintenance, general: 
Reservoir was operated for benefit of flood 
control, as required, and necessary repairs were made 
to structures and appurtenances. 
The rise of December 1969--January 1970 resulted 
in the storage of 25,000 acre-feet of water in the 
reservoir. The Levisa Fork at Pikeville crested at 31.9 
feet and the reduction effected by the reservoir was 4.5 
feet. Another noteworthy rise occurred in February 
1970 and resulted in the storage of 11,600 acre-feet of 
water in the reservoir. The Levisa Fork at Pikeville 
crested at 25.4 feet and the reduction effected by the 
reservoir was 2.7 feet. Another noteworthy rise occurred 
in April 1970 and resulted in the storage of 18, 
000 acre-feet of water in the reservoir. The Levisa Fork 
at Pikeville crested at 29.0 feet and the reduction 
effected by the reservoir was 3.9 feet. The project 
prevented flood damages of an estimated $895,000 
during the fiscal year. 
Condition at end of fiscal year. All major construction 
complete. Planning was completed for a portion of 
construction of recreational facilities under completed 
projects program. 402 tracts of land required for project 
have been acquired. 
18. KEHOE LAKE, KY. 
Location. Damsite is in Carter County, Kentucky, on 
Tygarts Creek, a tributary of Ohio River, 48.5 miles 
741

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
above mouth of Tygarts Creek and 1.7 miles above design memorandum and supplement thereto, cov- 
Kehoe, Kentucky. ering beautification and recreation was approved. 
Existing project. Provides for construction of a rolled 
earth and random rock fill dam 120 feet high and 1,350 
feet long; an uncontrolled spillway at right abutment of 
dam; and outlet tunnel through left abutment. 
Reservoir will provide for a total storage of 79,000 acrefeet, 
control a drainage of 127 square miles and 
necessitate the relocation of 6.0 miles of State highways, 
2.2 miles of County roads and 6 cemeteries 
containing approximately 300 graves. Reservoir will be 
operated as a unit of coordinated reservoir system for 
the protection of town of Kehoe and Tygarts and Ohio 
Valley, generally. Total estimated cost of new work 
(1970) is $21,400,000 which is to be appropriated and 
expended by the Government. The sponsor will 
reimburse the Government $635,000 for their share of 
initial recreational development: Project was authorized 
by 1966 Flood Control Act (H. Doc. 517, 89th 
Cong.). 
Local cooperation. Local interests must contribute that 
portion of recreation costs that exceed the portion 
permitted to be borne by the Federal Government 
under Public Law 89-72. 
Operations and results during fiscal year. Engineering 
studies were continued for inclusion in the general 
design memorandum. 
Condition at end offiscalyear. Preconstruction planning 
is 47 percent complete. 
19. MARTIN, KY. 
Location. In Floyd County, Ky., on Beaver Creek at 
confluence of Right and Left Forks, 5.5 miles above its 
junction with Levisa Fork. 
Existing Project. Channel improvement of 4.5 miles of 
Beaver Creek from 2.3 miles above the mouth to 
junction of Right and Left Forks. Improved channel to 
have a bottom width of 75 feet with placement of 
riprap along outside of all curves, and channel bottoms 
and both sides through three bridges. Project will 
reduce stages of major floods at Martin about 5.7 feet. 
Total estimated cost of new work (1970) is $3,180,000. 
Federal cost is $2,930,000 and non-Federal is $250,000 
for lands and damages and utility adjustments. Project 
authorized by 1965 Flood Control Act (H. Doc. 246, 
89th Cong.). 
Local cooperation. Responsible local interests must 
provide necessary lands, easements, and rights-of-way; 
hold the United States free from damages, maintain 
project after completion; provide necessary relocations; 
and prevent any encroachments on capacities of 
channel within limits of project. By letter, May 5, 1970, 
the Fiscal Court of Floyd County, Ky., furnished 
assurances of local cooperation. 
Operations and results during fiscalyear. Pre-construction 
planning, 60 percent complete, was continued. General 
Condition at end of fiscal year. Preconstruction planning 
is 60 percent complete. 
20. MASSILLON, OHIO 
Location. In Stark County, on Tuscarawas River, 200 
miles above mouth of Muskingum River. 
Existing project. Improvement of channel of Tuscarawas 
River, together with construction of drainage 
facilities, levees, and pump stations consists of: 12,800 
linear feet of channel rectification and improvements; 
4,300 feet of new channel; two reinforced concrete 
pressure conduits with a total length of 4,300 feet; 15, 
900 feet of earth levee; 200 feet of concrete wall; four 
pump stations; and three gate openings. For further 
details see Annual Report for 1962, page 1156. Existing 
project was selected for construction under general 
authorization for Ohio River Basin, in 1938 Flood 
Control Act. Project was constructed at a total Federal 
cost of $8,139,406. 
Local cooperation. None required by law. See Annual 
Report for 1962, page 1156, for details of local 
contributions for work beyond scope of project. 
Operations and results during fiscal year. Operation and 
maintenance, general: Routine inspections of improved 
channel were conducted and snagging and 
clearing work by hired labor was performed to 
maintain channel in a satisfactory condition. The 
Massillon project prevented flood damages of an 
estimated $4,894,000 during the fiscal year. 
Condition at end of fiscal year. Construction of project 
began in July 1940, was completed for beneficial 
occupancy in October 1951. Drainage structures and 
appurtenances including pressure conduits, gate openings, 
and pump stations have been turned over to 
the city for maintenance and operation. Improved 
channels and levees maintained by the United States 
are in good condition. 
21. MIDDLE FORK OF MUD RIVER W. 
VA. 
Location. In Lincoln County, on Middle Fork of Mud 
River, 8.5 miles above confluence with Mud River and 
about 30 miles southeast of Huntington, W. Va. 
Existing project. Channel improvement of Middle 
Fork of Mud River through town of Griffithsville and 
Yawkey for 21,000 feet. Project provides for enlargement 
of 14,400 feet and clearing and snagging of 
6,600 feet and will reduce floods equivalent to flood of 
record (Apr. 1962) by 3.3 feet, with only minor 
damages resulting. Construction of project authorized 
under section 205, 1948 Flood Control Act as amended. 
Federal cost of completed project is $517,375, non- 
Federal cost estimated at $51,000, for rights-of-way, 
alterations to highway bridges, and utilities. 
742

HUNTINGTON, W. VA., DISTRICT 
Local cooperation. Fully complied with. For details see 
Annual Report for 1969. 
Operations and results during fiscal year. Contract for all 
work, awarded in January 1967, was completed. The 
completed project prevented flood damages of an 
estimated $22,000 during fiscal year. 
Condition at end of fiscal year. All contract work 
complete. 
22. MILL CREEK LAKE, OHIO 
Location. Damsite is in Union and Delaware Counties, 
Ohio, on Mill Creek, a tributary of Scioto River, 
1.5 miles above mouth of Mill Creek and 157 miles 
above mouth of Scioto River. 
Existing project. Provides for construction of a rolled 
earth-fill dam 89 feet high and 12,000 feet long, with a 
720-foot concrete gravity channel section; a gated 
spillway in channel section controlled by five 38- by 20- 
foot tainter gates; outlet works consisting of four 4- by 
6-foot gated sluices through spillway section; one 
earthfill dike 17,500 feet long, average height of 7.3 
feet; and one levee 4,000 feet long with pump station 
and necessary appurtenances for protection of Ostrander, 
Ohio. Reservoir will provide a total storage of 
92,500 acre-feet; control a drainage area of 181 square 
miles; and necessitate relocation or reconstruction of 
4.4 miles of roads; 0.6 mile railroad tracks; 3.0 miles of 
powerlines; 4.3 miles of telephone lines; and 4 
cemeteries containing 1,310 graves. Reservoir will be 
operated as a unit of coordinated reservoir systems for 
protection of Scioto and Ohio River Valleys, generally, 
and contribute to reductions of flooding at industrial 
and population centers of Columbus and Chillicothe. 
Project authorized for construction under 1962 Flood 
Control Act. Estimated Federal cost of project (1970) is 
$30,300,000. Above data based on Survey Report 
dated 1962 since GDM not yet approved. 
Local cooperation. Local interests are required to 
operate and maintain fish and wildlife facilities. The 
State of Ohio has expressed its intent to operate, 
maintain and further develop all recreation facilities. 
Operations and results during fiscal year. Engineering 
studies continued. Revision to General Design Memorandum 
is complete. Supplemental information to 
General Design Memorandum is 5 percent complete. 
Condition at end of fiscal year. Engineering studies 
continued. Preconstruction planning is 71 percent 
complete. The State of Ohio initiated planning for 
relocation of State Route 36. The State will prepare 
plans and perform all work and be reimbursed by the 
Government for that part of the work constructed in 
the reservoir. 
23. MUSKINGUM RIVER DAMS AND 
LAKES, OHIO 
Location. Muskingum River lies in southeastern Ohio 
and, with its tributaries, drains about 8,000 square 
miles. Its headwaters rise about 25 miles south of Lake 
Erie and it flows into Ohio River at Marietta, Ohio, 
172.2 miles below Pittsburgh, Pa. 
Existing project. Construction, operation, and maintenance 
of 14 reservoirs and appurtenant works in 
Muskingum River Basin. It was originally authorized 
by Public Works Administration February 20, 1934, to 
include 15 reservoirs as set forth in an official plan 
prepared by the Corps and adopted by Muskingum 
Watershed Conservancy District of Ohio, the sponsoring 
agency. Project was operated and maintained by 
conservancy district from July 1938 to August 1939 
when it was taken over by Corps for maintenance and 
operation in accordance with provisions of 1939 Flood 
Control Act. For further details see page 1157, Annual 
Report for 1962. Estimated Federal cost of new work is 
$41,119,288. See table on page 1159 of the Annual 
Report for 1962, which gives the principal features of 
the 14 reservoirs. 
Local cooperation. Fully complied with. For details see 
Annual Report for 1942, page 1257. 
Operations and results during fiscal year. New work: 
Planning for construction of recreational facilities 
under completed projects program was continued. 
Operation and maintenance, general: Reservoirs were 
operated for benefit of flood control as required, and 
necessary repairs were made to dams, appurtenances, 
operator's quarters and grounds. 
The flood of July 1969 resulted in the storage of 530, 
110 acre-feet of water in the reservoirs. Beach City 
Reservoir pool level reached elevation 976.25 feet, 
which was within 0.25 feet of the spillway elevation. 
Mohicanville Reservoir pool level reached elevation 
962.35 feet, which was within 0.65 feet of the spillway 
elevation. Dover Reservoir pool level reached elevation 
905.00 feet, which was the highest elevation in the 
period of record. River crests and reductions effected 
by the reservoirs were as follows: Coshocton-crest of 
16.7 feet and reduction effected of 8.4 feet; 
Dresden--crest of 20.1 feet and reduction effected of 
12.7 feet; Zanesville-crest of 19.1 feet and reduction 
effected of 16.4 feet; McConnelsville-crest of 10.0 feet 
and reduction effected of 9.0 feet. Two noteworthy rises 
occurred in April 1970. During the first rise the river 
crests and reductions effected by the reservoirs were as 
follows: Coshocton-crest of 9.7 feet and reduction 
effected of 3.9 feet; Dresden--crest of 16.3 feet and 
reduction effected of 5.0 feet; Zanesville-crest of 17.2 
feet and reduction effected of 3.6 feet; 
McConnelsville-crest of 9.2 feet and reduction 
effected of 2.0 feet. During the second rise of April 1970 
the river crests and reductions effected by the reservoirs 
were as follows: Coshocton--crest of 9.0 feet and 
reduction effected of 2.7 feet; Dresden--crest of 15.3 
feet and reduction effected of 4.9 feet; 
Zanesville--crest of 16.7 feet and reduction effected of 
3.1 feet; McConnelsville-crest of 10.9 feet and 
reduction effected of 1.1 feet. 
743

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
During the fiscal year. Muskingum River Reservoir 
System prevented flood damages estimated at $53,384, 
000. 
Condition at end of fiscal year. Construction of project 
initiated in January 1935, was completed in November 
1938. All flood control dams are in operation. Planning 
continued for construction of recreational facilities 
under completed projects program. 
24. NEWARK, OHIO 
Location. In Licking County at junction of North and 
South Forks of Licking River, 29 miles above its 
confluence with Muskingum River at Zanesville, Ohio. 
Existing project. Provides for 31,500 linear feet of 
channel improvements of Licking River, North and 
South Forks of Licking River, and Raccoon Creek; 5, 
450 feet of levee along North and South Forks of 
Licking River; and pump station and sump for disposal 
of interior drainage. Project provides protection for city 
of Newark against floods 22 percent greater than that 
of 1913 (one of the greatest of record) with a 3-foot 
freeboard. Existing project was selected for construction 
under general authorization for Ohio River 
Basin in 1938 Flood Control Act. Federal cost of 
completed project is $845,916. The existing Newark 
Local Protection Project was modified by the Flood 
Control Act of 1968-HD 337/90Q2-to include improvement 
of the interior drainage facilities, construction 
of the Log Pond Run diversion, and modifications 
of the North Fork Channel. The estimated 
final cost of this part of the project is $2,430,000, of 
which $2,110,000 is Federal. Funds were appropriated 
in FY 1970 but placed in budgetary reserve for use in 
FY 1971. 
Local cooperation. Fully complied with. Cost for all 
requirements under terms of project authorization was 
$21,000. 
Operations and results during fiscal year. Operation and 
Maintenance, General: Routine inspections of improved 
portion of channel were conducted. Snagging 
and clearing work, by hired labor was performed. 
Condition at end of fiscal year. Existing project was 
initiated in July 1940 and completed for beneficial 
occupancy in November 1941, and pump facilities and 
levees turned over to City for maintenance and 
operations. 
25. NORTH BRANCH OF KOKOSING 
LAKE, OHIO 
Location. Damsite is in Knox County, Ohio, on North 
Branch of Kokosing River, about 9.1 miles above 
confluence of Kokosing and North Branch Rivers, and 
2.2 miles northwest of Fredericktown, Ohio. 
Existing project. Plan provides for a rolled earthfill 
dam, 70 feet high and 1,400 feet long with an 
uncontrolled spillway adjacent to right abutment. 
Reservoir will provide for a total storage of 14,885 acrefeet, 
control a drainage area of 44.5 square miles, and 
necessitate relocation of 5.05 miles of telephone and 
power lines and 2.65 miles of county roads. Reservoir 
will be operated for protection of Fredericktown and 
Mt. Vernon, Ohio, valleys of North Branch and 
Kokosing Rivers and to a lesser degree, Muskingum 
and Ohio River Valleys. Existing project was selected 
for construction under general authorization for Ohio 
River Basin in 1962 Flood Control Act. Estimated 
Federal cost of new work (1970) is $6,800,000. 
Local cooperation. None required by law. 
Operations and results during fiscal year. New work: 
Contract for construction of dam, outlet works, 
spillway and access road awarded June 1970 and work 
advanced to 2 percent completion. Planning complete 
for relocation of Highway Route 6. Engineering studies 
continued. Three tracts of land acquired. 
Condition at end of fiscal year. Contract for construction 
of dam and appurtenances is 2 percent complete. 
Planning for remaining work continued. 56 tracts of 
land required for the project have been acquired. 
26. NORTH FORK OF POUND LAKE, VA. 
Location. Dam is in Wise County, Va., on North Fork 
of Pound River about 1.1 miles upstream from 
confluence of North and South Forks which join to 
form Pound River. 
Existing project. A rockfill dam, with height of 130 feet, 
crest length of 600 feet and crest width of 32 feet; an 
uncontrolled spillway in a saddle about 1,000 feet 
upstream from dam; and an outlet tunnel in right 
abutment with control structure at upstream end. 
Reservoir provides for about 11,300 acre-feet of 
storage, and controls a drainage area of 17.6 square 
miles. For further details see Annual Report for 1965, 
page 951. Existing project was authorized under 1960 
Flood Control Act. Estimated Federal cost of project is 
$6,160,000. 
Local cooperation. None required by law. 
Operations and results during fiscal year. Planning 
complete for construction of buildings, grounds and 
utilities and furnishing potable water supply for dam 
area. One tract of land acquired. Operations and 
Maintenance, General: The rise of December 
1969-January 1970 resulted in the storage of 2,650 
acre-feet of water in the reservoir. Pound River at 
Pound, Virginia, crested at 11.9 feet and the reduction 
effected by the reservoir was 2.9 feet. The rise of 
February 1970 resulted in the storage of 1,290 acre-feet 
of water in the reservoir. Pound River at Pound, 
Virginia, crested at 9.3 feet and the reduction effected 
by the reservoir was 2.7 feet. The rise of April 1970 
resulted in the storage of 1,370 acre-feet of water in the 
reservoir. Pound River at Pound, Virginia, crested at 
10.6 feet and the reduction effected by the reservoir was 
2.4 feet. The project prevented flood damages of an 
estimated $1,000 during the fiscal year. 
744

HUNTINGTON, W. VA., DISTRICT 
Condition at end of fiscal year. Construction of project, 
initiated March 1963, is essentially complete. Contract 
work remaining consists of construction of utility and 
operations building and furnishing a potable water 
supply for project features. Planning is complete. 128 
tracts of land required for project have been acquired. 
27. OHIO RIVER BASIN (HUNTINGTON 
DIST.) 
Location. Works covered by this project are a series of 
levees, floodwalls, channel improvements, and dams 
and lakes in Ohio River Basin within Huntington 
District. 
Existing project. Individual projects considered in 
comprehensive plan within Huntington District. (See 
Table 24-D on local protection projects; Table 24-E on 
dams and lakes; and Table 24-F on authorizing 
legislation.) 
Operations and results during fiscal year. None. Completed 
local protection projects, operated and maintained 
by local interests, other than those for which 
individual reports have been included, prevented flood 
damages of an estimated aggregate total of $545,000 
during fiscal year. 
Condition at end of fiscal year. Preliminary surveys and 
plans are complete for a number of projects included in 
comprehensive plan. Status of projects selected for 
construction under this authorization is in individual 
reports. (See Table 24-G on project costs to June 30, 
1970.) 
28. PAINT CREEK LAKE, OHIO RIVER 
BASIN, OHIO 
Location. Damsite is in Ross County, Ohio, on Paint 
Creek, a tributary of Scioto River, 37 miles above 
mouth of Paint Creek and 100 miles above mouth of 
Scioto River. 
Existing project. Provides for construction of a rock and 
random-fill dam with maximum height above 
streambed of 118 feet and 700 feet long; a gate 
controlled spillway 191 feet wide, 1,000 feet from right 
abutment; an outlet tunnel in right abutment with 
control structure at upstream end; and one random 
rockfill dike at right abutment of spillway, 1,400 feet 
long and 70 feet high. Reservoir will provide storage of 
145,000 acre-feet and control a drainage area of 573 
square miles. For further details, see Annual Report for 
1965, page 955. Reservoir will be operated as a unit of 
coordinated reservoir system for protection of Chillicothe, 
Ohio, Paint Creek Basin, and Scioto and Ohio 
Valleys, generally. Existing project selected for construction 
under general authorization for Ohio River 
Basin in 1938 Flood Control Act. Estimated Federal 
cost of project (1970) is $24,700,000. 
State of Ohio has expressed its intent to operate, 
maintain and further develop all recreation facilities. 
Operations and results during fiscal year. New work: 
Contract for construction of Outlet Works, awarded 
July 1967, was completed. Contract for construction of 
dam, dikes, spillway and access road, awarded April 
1970 advanced to 8 percent completion. Contract for 
relocation of remaining highway, awarded May 1970 
advanced to 13 percent completion. 40 tracts of land 
acquired. 
Condition at end offiscalyear. Contracts for relocation of 
Route 753 and construction of outlet works are 
complete. Contracts for construction of dam, dikes, 
spillway and access road is 8 percent complete and 
remaining highway relocation 13 percent complete. 
Planning continued for construction of recreational 
facilities and relocation of cemeteries and municipal 
facilities. 210 tracts of 256 required for project have 
been acquired. 
29. PAINTSVILLE LAKE, KY. 
Location. Damsite is in Johnson County, Ky., on 
Paint Creek, a tributary of Levisa Fork of Big Sandy 
River, 7.8 miles above mouth of Paint Creek. 
Existing project. Provides for construction of an 
earthfill dam with maximum height of 160 feet above 
streambed and crest length of 850 feet; an uncontrolled 
spillway about 500 feet west of right abutment; and 
outlet works, consisting of a 10-foot diameter horseshoe 
tunnel in right abutment with control structure at 
upstream end. Reservoir will provide a total storage of 
76,400 acre-feet, control a drainage area of 92 square 
miles and necessitate relocation or reconstruction of 6.6 
miles of highways, 3.7 miles of powerlines, 5 miles of 
telephone lines, 2.7 miles of gas lines, 19 cemeteries and 
one school. Reservoir will be operated as a unit of 
coordinated reservoir system for protection of town of 
Paintsville, lower Paint Creek Valley and Levisa Fork, 
Big Sandy and Ohio Valleys, generally. Total estimated 
cost for new work (1970) is $24,800,000 which 
is to be appropriated and expended by the Government. 
The sponsor will reimburse the Government 
$1,040,000 for their share of initial recreational 
development. Project was authorized by 1965 Flood 
Control Act (H. Doe. 246, 89th Cong.). 
Local cooperation. Local interests must contribute 50 
percent of recreation costs under current policy Public 
Law 89-72. 
Operations and results during fiscal year. Preconstruction 
planning continued. General Design Memorandum is 
95 percent complete. 
Condition at end offiscalyear. Preconstruction planning 
is 92 percent complete. 
30. R. D. BAILEY LAKE, W. VA. 
Local cooperation. Local interests are required to Location. Damsite is in Wyoming County, W. Va., on 
operate and maintain fish and wildlife facilities. The Guyandot River about 108 miles above confluence 
745

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
with Ohio River, and about 1.3 miles east of Justice, W. 
Va. 
Existing project. Provides for construction of a rolled 
rockfill dam with maximum height of 305 feet and 
length of 1,330 feet; a 400-foot crest uncontrolled 
spillway in a saddle in right abutment and outlet works 
comprised of a 18-foot diameter circular tunnel in left 
abutment. Reservoir will provide a total storage of 203, 
700 acre-feet; control a drainage area of 540 square 
miles; and necessitate relocation or reconstruction of 
25.3 miles of railroad track; 14.0 miles of State 
highways; 60 cemeteries containing 1,590 graves; 12.42 
miles of powerlines with one substation; 9.86 miles of 
telephone lines; 4 schools; and relocation and adjustment 
to oil and gas lines and facilities of 5 oil and 
gas companies. Reservoir will be operated as a unit of 
coordinated reservoir system for protection of Logan, 
W. Va. and Guyandot and Ohio River Valleys, 
generally. Existing project selected for construction 
under general authorization for Ohio River Basin in 
1962 Flood Control Act. Estimated Federal cost for 
new work (1970) is $99,000,000. 
Local cooperation. None required by law. 
Operations and results during fiscal year. Construction of 
the project was initiated in June 1967 with the award of 
first phase of railroad relocation. All railroad relocation 
work will be contracted by the N&W Railroad 
Company and reimbursed by the Government. RR 
relocations contracts: Construction of RR tunnel No. 2 
and U. S. Route 52, Segment 3, awarded April 1968, 
advanced to 65 percent completion; construction of 
segments 4, 5 and 6 awarded September 1968, 
advanced to 47 percent completion; construction of 
segments 7, 8 and 9 awarded April 1970, was initiated 
in late FY 1970; and construction of segments 11 and 
12, awarded in May 1970, was initiated in late FY 
1970. Contracts by the Government: Cemetery relocations, 
Part II, awarded in May 1970 was 56 percent 
complete and contract for relocation of State Route 9/1, 
awarded in May 1970, was initiated in late FY 1970. 
Engineering studies for remaining work continued. 227 
tracts of land acquired. 
Condition at end of fiscal year. Total railroad relocation 
work is 25 percent complete. Cemetery relocation, Part 
II, is 56 percent complete and contract for relocation of 
S.R. 9/1 was initiated late in FY 1970. 486 of 1,427 
tracts of land required for project have been acquired. 
Engineering studies continued. 
31. ROCKCASTLE CREEK, INEZ, KY. 
Location. On Rockcastle Creek and Coldwater Fork 
at and near town of Inez, Martin County, Ky. 
Existing project. Channel improvement of Rockcastle 
Creek and Coldwater and Middle Forks for 13,650 feet 
and snagging and clearing of 1,500 feet of smaller 
tributaries. Project will reduce floods equivalent to 
flood of record (Feb. 1962) by 3.2 feet, resulting in 
about 77 percent reduction in damages. Construction 
of project authorized under section 205, 1948 Flood 
Control Act, as amended. Estimated Federal cost of 
project, $750,000, non-Federal cost estimated at $70, 
000 for rights-of-way, bridge alteration, and utility 
relocations. 
Local cooperation. Section 3, Flood Control Act of 1936, 
as amended, applies. Assurances by Martin County 
Court adopted on March 23, 1963. 
Operations and results during fiscal year. Contract for 
entire project awarded March 1970. Work advanced to 
36 percent completion. 
Condition at end of fiscal year. Construction contract is 
36 percent complete. 
32. ROSEVILLE, OHIO 
Location. In Muskingum and Perry Counties, Ohio, 
on Moxahala Creek, about 6 miles above its confluence 
with Jonathan Creek, a tributary of Muskingum River. 
Existing project. Protection of Roseville by channel 
rectification and levee construction. Provides 7,290 feet 
of channel improvement; 6,400 feet of levee and 
railroad embankment enlargement; and necessary 
appurtenances for disposal of interior drainage. Project 
was selected for construction under general authorization 
for Ohio River Basin, in 1938 Flood 
Control Act. Federal cost of project as completed is 
$910,785. 
Local cooperation. Fully complied with. Total cost of all 
requirements under terms of project authorization was 
$62,000 (1961). 
Operations and results during fiscal year. Operation and 
maintenance, general: Routine inspections of improved 
portion of project were conducted. Snagging 
and clearing of channel completed in May 1969. 
Condition at end of fiscal year. Construction of project, 
initiated August 1959, is complete. A minor amount of 
real estate audit work remains to be completed. 
33. SALT CREEK LAKE, OHIO RIVER 
BASIN, OHIO 
Location. Damsite is in Ross County, Ohio, on Salt 
Creek, a tributary of Scioto River, 15 miles above 
mouth of Salt Creek, and 12 miles southeast of 
Chillicothe, Ohio. 
Existing project. Plan provides for construction of a 
rolled earthfill dam, 96 feet high and 1,490 feet long 
with an uncontrolled spillway in a saddle near left 
abutment, and an intake structure with three gated 
sluices 5 by 9 feet, discharging through a 12.5-foot 
diameter conduit into a stilling basin. Reservoir will 
provide for a total storage of 114,000 acre-feet; control 
a drainage area of 285 square miles and necessitate 
relocation of 6.8 miles of State roads, 7.1 miles of 
county roads, and three cemeteries. Reservoir will be 
operated as a unit of coordinated reservoir system for 
protection of Salt Creek Valley and Scioto and Ohio 
River Valleys, generally. Project authorized by 1962 
Flood Control Act. Estimated Federal cost for new 
work (1970) is $22,600,000. 
746

HUNTINGTON, W. VA., DISTRICT 
Local cooperation. Project authorization provides that 
non-Federal interests operate and maintain proposed 
fish and wildlife recreation facilities. The State of Ohio 
has expressed its intent to operate, maintain and 
further develop all recreation facilities. 
Operations and results during fiscal year. Engineering 
studies continued. General Design Memorandum is 
complete. Supplement to General Design Memorandum 
is 95 percent complete. 
Condition at end of fiscal year. Preconstruction planning 
is 87 percent complete. 
34. SOUTH WILLIAMSON, KY. 
Location. In Pike County, on left descending bank of 
Tug Fork of Big Sandy River, 55.6 miles above mouth 
of Tug Fork. 
Existing project. Plan of improvement provides for 
construction of approximately 790 feet of levee; 1,347 
feet of concrete wall; 880 feet of storm and/or sanitary 
sewers; and one pump station. The project will provide 
protection to the Appalachian Regional Hospital 
against floods 6 feet higher than the March 1963 flood, 
with 3 feet of free board. (Maximum of record). 
Construction of the project authorized under Section 
205, 1948 Flood Control Act, as amended. Estimated 
Federal cost of project, $710,000. Non-Federal cost 
estimated at $15,000, for rights-of-way, alterations to 
utilities and construction of a service road. 
Local cooperation. Section 3, Flood Control Act of 1936, 
as amended, applies. Assurances by Pike County Fiscal 
Court adopted November 22, 1963. 
Operation and results during fiscal year. Construction 
contract for entire project awarded November 1969 
and work advanced to 31 percent completion. 
Condition at end of fiscal year. Construction contract for 
entire project is 31 percent complete. 
35. SUMMERSVILLE LAKE, OHIO RIVER 
BASIN, W. VA. 
Location. Dam is on Gauley River at Ruckers Bend, 
Nicholas County, W. Va., about 34.5 miles above 
confluence of Gauley and New Rivers at Gauley 
Bridge, W. Va. 
Existing project. A rockfill dam having a maximum 
height of 357 feet, top length of 2,280 feet and top and 
base width of 40 and 1,400 feet, respectively; and outlet 
tunnel in right abutment with control structure at 
downstream end; an uncontrolled spillway, with a crest 
length of 1,250 feet; 3,500 feet west of right abutment in 
low point in rim of reservoir; and two rolled earthfill 
dikes which prevent diversion of water into Meadow 
Creek Valley. Reservoir provides for about 413,800 
acre-feet of storage and controls a drainage of 803 
square miles. For further details see Annual Report for 
1965 page 957. Existing project was selected for 
construction under general authorization for Ohio 
River Basin in 1938 Flood Control Act. Estimated 
Federal cost for new work is $47,845,000. 
Local cooperation. None required by law. 
Operations and results during fiscal year. New work: 
Rebuilding and replacement of three 108 inch Howell- 
Bunger outlet works valves was completed. A lease for 
camping concessions was awarded April 1970. Planning 
for construction of remaining recreational facilities 
continued. Operations and Maintenance, general: 
Reservoir was operated for flood control, as 
required, and necessary repairs were made to structure 
and appurtenances. 
The rise of December 1969 January 1970 resulted 
in the storage of 127,000 acre-feet of water in the 
reservoir. Kanawha River at Kanawha Falls crested at 
18.6 feet, Kanawha River at Charleston (old Lock 6) 
crested at 33.7 feet and Kanawha River at Winfield 
(lower) crested at 38.8 feet. The reductions effected by 
the reservoir were 3.9 feet at Kanawha Falls, 5.6 feet at 
Charleston (old Lock 6) and 3.0 feet at Winfield 
(lower). The project prevented flood damages of an 
estimated $29,867,000 during the fiscal year. 
Condition at end of fiscal year. Work remaining consists 
of: Construction of recreational facilities at 1 site. 414 
tracts of land required for the project have been 
acquired. Entire project is 99 percent complete. 
36. SUTTON LAKE, OHIO RIVER BASIN, 
W. VA. 
Location. Dam is on Elk River, W. Va., 1 mile above 
town of Sutton, W. Va. and about 101 miles above 
mouth of Elk River. 
Existing project. A concrete gravity dam having a 
maximum height of 220 feet; and an overall length of 1, 
178 feet, consisting of 280 feet of spillway section and 
898 feet of nonoverflow sections and abutments. 
Reservoir provides for storage of 265,300 acre-feet and 
controls a drainage area of 537 square miles. Existing 
project was selected for construction under general 
authorization for Ohio River Basin in 1938 Flood 
Control Act. For further details, see page 1166, Annual 
Report for 1962. Estimated Federal cost of new work is 
$36,384,809. 
Local cooperation. None required by law. Under terms 
of an existing agreement, Baltimore & Ohio Railroad 
Co. paid $62,800 toward relocation of railroad for a 
modified slope and other betterments. 
Operations and results during fiscal year. New work: 
Planning for construction of recreation facilities under 
completed projects program and final real estate 
activities were continued. Six tracts of land were 
acquired. Operations and maintenance, general: 
Reservoir was operated for flood control, as required, 
and necessary repairs were made to structures and 
appurtenances. 
The rise of December 1969-January 1970 resulted 
in the storage of 80,130 acre-feet of water in the 
747

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
reservoir. Elk River near Frametown crested at 14.5 
feet, and Elk River at Queen Shoals crested at 19.0 feet. 
The reductions effected by the reservoir were 9.3 feet at 
Frametown and 8.1 feet at Queen Shoals. The project 
prevented flood damages of an estimated $14,282,000 
during the fiscal year. 
Condition at end of fiscal year. Construction of project, 
initiated in October 1949, and dam operation effected 
February 1960. All construction complete except 
planning and construction of recreation facilities under 
completed project program. 598 tracts of land required 
for the project have been acquired. 
37. TOM JENKINS RESERVOIR, OHIO 
RIVER BASIN, OHIO 
Location. Dam is on East Branch of Sunday Creek, a 
tributary of Hocking River, Ohio, about 3 miles north 
of village of Glouster and 57.2 miles above mouth of 
Hocking River. 
Existing project. A rolled-earthfill dam having a 
maximum height of 84 feet and a total length of 944 
feet, controlled outlet works discharging through a 
tunnel in left abutment; and an uncontrolled spillway 
in ridge running south from damsite. Existing project 
was authorized under 1944 Flood Control Act. For 
further details see pages 1164 and 1165 in Annual 
Report for 1962. Federal cost of completed work was 
$2,086,503. 
Local cooperation. For details see page 1165, Annual 
Report for 1962. In fiscal year 1964 $64,660 contributed 
funds was received from State of Ohio. 
Operations and results during fiscal year. New work: 
Planning for construction of recreational facilities 
under completed projects program continued. Operation 
and maintenance, general: Reservoir was 
operated for flood control, as required, and necessary 
repairs were made to structures and appurtenances. 
The flood of April 1970 resulted in the storage of 2, 
910 acre-feet of water in the reservoir. Sunday Creek at 
Glouster crested at 15.0 feet and Hocking River at 
Athens crested at 15.8 feet. Reductions effected by the 
reservoir were 1.3 feet at Glouster and 0.1 feet at 
Athens. The project prevented flood damages of an 
estimated $62,000 during the fiscal year. 
Condition at end of fiscal year. Construction of project 
was initiated in March 1948 and completed in 
February 1950. Reservoir provides substantial protection 
to Sunday Creek Valley as well as serving as a 
unit of coordinated reservoir system for protection of 
Hocking and Ohio Valleys. Reservoir also provided an 
assured source of water supply to villages, industries 
and coal mining operations in Sunday Creek Valley. 
38. UTICA LAKE, OHIO 
Location. Damsite is on North Fork of Licking River 
in Knox County, Ohio, 18.6 miles above the mouth of 
North Fork and 47.7 miles above the mouth of Licking 
River. 
Existing Project. Provides for construction of a rolled 
earth-fill dam having a maximum height of 73 feet, 
crest length of 4,880 feet and top width 32 feet; an 
uncontrolled, 200 foot spillway in right abutment; and 
outlet works consisting of a dry type intake structure 
controlled by multiple level gate openings. Reservoir 
will provide for a total storage of 82,000 acre-feet from 
a drainage area of 113.8 square miles and will 
necessitate the construction or relocation of 4.8 miles of 
railroads; 6 miles of county and State roads; 0.9 miles 
of gas lines and one compressor station; 10.1 miles of 
power lines; 17.6 miles of telephone lines; and 2 
cemeteries containing approximately 450 graves. The 
reservoir, with existing Newark, Ohio, local protection 
project and proposed improvements thereto, will serve 
to further protect the city of Newark from severe and 
frequent flooding. The reservoir also will be operated as 
a unit of a coordinated reservoir system for the 
protection of North Fork of Licking, Licking, Muskingum 
and Ohio Valleys generally. Existing project 
selected for construction under 1968 Flood Control 
Act. Total estimated cost of New Work (1970) is $39, 
400,000, which is to be appropriated and expended by 
the Government. The Sponsor will reimburse the 
Government $10,600,000, exclusive of interest, for costs 
allocated for water supply and $1,760,000 for their 
share of initial recreational deveopment. 
Local cooperation. Project requires that non-Federal 
interests operate and maintain the proposed recreation 
and fish and wildlife facilities at an average annual cost 
of $116,600; pay for operation and maintenance of 
water supply portion of project ($8,200); reimburse the 
Federal Government for cost of water supply facilities, 
currently estimated at $10,600,000; and reimburse the 
Federal Government for one-half the separable costs 
allocated to recreation and fish and wildlife development, 
presently estimated to be $1,760,000 
initially and $3,155,000 ultimately. 
The Director of Department of Natural Rnsources, 
State of Ohio, has indicated by letters, the State's intent 
to provide all necessary assurances required for both 
water supply and recreation functions. 
Operation and results during fiscal year. Pre-construction 
planning initiated. Site selection and formulation was 
initiated and advanced to 20 percent completion. 
Condition at end of fiscal year. Engineering studies 
continued. Pre-construction planning is 9 percent 
complete. 
39. WEST FORK LAKE, OHIO RIVER 
BASIN, W. VA. 
Location. Dam site is in Calhoun and Wirt Counties, 
West Virginia, on the West Fork of the Little Kanawha 
River, 2.0 miles above the mouth of West Fork and 50.7 
miles above the mouth of the Little Kanawha River. 
748

HUNTINGTON, W. VA., DISTRICT 
Existing project. Provides for construction of an 
earthfill dam 155 feet high and 970 feet long, with an 
uncontrolled, partially lined spillway located in a 
saddle ridge, one quarter mile upstream from left 
abutment. Outlet works consists of a concrete lined 
tunnel in right abutment of dam. Reservoir will 
provide a total storage of 98,400 acre-feet and control a 
drainage area of 237.5 square miles; and necessitate the 
relocation or construction of 5.7 miles or roads, 7.5 
miles of power lines, 3.0 miles of telephone lines, 10 
cemeteries (1000 graves), and one small school. 
Reservoir will be operated as a unit of coordinated 
reservoir system for protection of West Fork, Little 
Kanawha and Ohio River Valleys. Existing project 
was selected for construction under general authorization 
for Ohio River Basin in 1938 Flood Control 
Act. Total estimated cost of new work (1970) is $26, 
400,000 which is to be allocated and expended by the 
Government. The sponsor will reimburse the Government 
$570,000 for their share of initial recreational 
development. 
Local cooperation. Recreation cost sharing is required 
and the intent of the State of West Virginia to so share 
costs has been received. 
Operations and results during fiscal year. Engineering 
studies were continued for inclusion in the general 
design memorandum. 
Condition at end of fiscalyear. Preconstruction planning 
is 40 percent complete. 
40. YATESVILLE LAKE, KY. 
Location. Damsite is in Lawrence County, Ky., on 
Blaine Creek, a tributary of Big Sandy River, about 5 
miles west of Louisa, Ky., and 18.5 miles above mouth 
of Blaine Creek. 
Existing project. Provides for construction of an 
earthfill dam with maximum height of 115 feet above 
streambed and crest length of 740 feet; and uncontrolled 
spillway in a saddle southeast of the dam; 
and outlet works consisting of a 14-foot diameter 
horseshoe tunnel through left abutment of dam with 
control structure at upstream end. Reservoir will 
provide a total storage of 99,800 acre-feet, control a 
drainage area of 208 square miles and necessitate 
relocation or reconstruction of 8.6 miles of highways, 
10.4 miles of powerlines, 11.3 miles of telephone lines, 
5.5 miles of oil and gas lines, 9 cemeteries, and 2 
schools. Reservoir will be operated as a unit of the 
coordinated reservoir system for protection of town of 
Yatesville, lower Blaine Creek Valley and Big Sandy 
and Ohio Valleys, generally. Total estimated cost for 
new work (1970) is $25,300,000 which is to be allocated 
and expended by the Government. The sponsor will 
reimburse the Government $1,375,000 for their share 
of initial recreational development. Project was authorized 
by 1965 Flood Control Act (H. Doc. 246, 89th 
Cong.). 
Local cooperation. Local interests must contribute that 
portion of recreation costs that exceed that portion 
permitted to be borne by the Federal Government 
under Public Law 89-72. 
Operations and results during fiscal year. Engineering 
studies were continued. Preparation of General Design 
Memorandum (Draft) was completed. 
Condition at end of fiscal year. Preconstruction planning 
continued and is 82 percent complete. 
41. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Flood Control Act of June 22, 1936, and subsequent 
acts require local interests to furnish assurances that 
they will maintain and operate certain local protection 
projects after completion in accordance with regulations 
prescribed by Secretary of the Army. District 
Engineers are responsible for administration of these 
regulations within their respective districts. Maintenance 
inspections were made during fiscal year of 
completed units of projects transferred to local interests 
for maintenance and operation. Local interests were 
advised, as necessary, of measures required to maintain 
those projects in accordance with standards prescribed 
by regulations. Fiscal year cost was $21,509. Total cost 
to June 30, 1970, was $186,573. (See Table 24-H on 
inspection of flood control projects.) 
42. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See Table 24-I. 
43. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
For flood control activities pursuant to section 205, Public 
Law 858, 80th Congress, as amended (preauthorization). 
See Table 24-J. 
For snagging and clearing navigable streams and tributaries 
in interest of flood control (sec. 208, 1954 Flood Control Act, 
Public Law 780, 83rd Cong.). 
See Table 24-J. 
Flood control and coastal emergencies activities Law 99, 84th 
Cong., and antecedant legislation. 
Fiscal Year costs were $169,163 of which $24,805 
was for advance preparation and $144,358 was for 
flood emergency operations. 
GENERAL INVESTIGATIONS 
44. SURVEYS 
Fiscal Year costs were $566,976, of which $135,171 
was for flood control studies, $429,780 for comprehensive 
basin studies and $2,025 for coordination 
studies. 
49 
451-584 0-72-48

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
45. COLLECTION AND STUDY OF BASIC 
DATA 
Fiscal Year costs were $152,056. Work continued on 
flood plain information studies of: Big Sandy 
River-Boyd and Lawrence Counties, Kentucky and 
Wayne County, West Virginia; Hocking River, Athens, 
Ohio; Levisa Fork, Grundy, Virginia; Little Coal 
River, Madison, West Virginia; Little Kanawha 
River-Glenville and Grantsville, West Virginia; Mill 
Creek, Ripley, West Virginia; Ohio River-Boyd, 
Bracken, Greenup, Lewis and Mason Counties, Kentucky, 
Adams, Brown, Lawrence and Scioto Counties, 
Ohio, and Cabell and Wayne Counties, West Virginia; 
and Tuscarawas River-Stark County and New 
Philadelphia-Dover, Ohio. Technical assistance was 
rendered to Federal and non-Federal agencies under 
the Flood Plain Management Service Program. (See 
Table 24-K on completed flood plain studies.) 
46. RESEARCH AND DEVELOPMENT 
Fiscal Year costs were $3,795 for hydrologic studies. 
750

HUNTINGTON, W. VA., DISTRICT 
TABLE 24-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 
Kanawha River, W. Va. New Work 
5. Alum Creek Lake, 
Ohio 
6. Athens, Ohio 
7. Beech Fork Lake, 
W. Va. 
8. Bluestone Lake, 
Ohio River Basin, 
W. Va. 
9. Burnsville Lake, 
Ohio River Basin, 
W. Va. 
10. Deer Creek Lake, 
Ohio River Basin, 
Ohio 
11. Delaware Lake, Ohio 
River Basin, Ohio 
12. Dewey Lake, Ohio 
River Basin, Ky. 
13. Dillon Lake, Ohio 
River Basin, Ohio 
14. East Lynn Lake, Ohio 
River Basin, W. Va. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
700,000 735,300 
764,117 667,112 
309,000 
259,127 
131,000 
41,607 
300,000 
109,315 
167,286 
150,000 
131,244 
285,000 
239,668 
6,832,000 
5,592,887 
78,000 
80,522 
3,225 
8,028 
114,000 
87,642 
25,000 
34,423 
66,000 
58,133 
3,700,000 
1,914,030 
660,000 
143,043 
60,000 
108,182 
345,000 
238,101 
1,182 
124,626 
150,067 
235,000 
155,624 
7,128,000 
4,807,303 
23,683 
23,457 
78,022 
77,842 
52,000 
31,561 
99,460 
125,783 
5,985 
11,472 
58,080 
66,409 
2,095,015 
4,389,318 
835,300 992,750 
806,652 859,983 
400,000 
760,509 
631,000 
507,452 
370,000 
442,278 
-1,680 
30,657 
203,100 
162,584 
300,000 
326,394 
-513,274 
862,631 
94,500 
94,289 
84,700 
84,916 
70,000 
120,032 
134,100 
123,334 
14,950 
14,950 
103,200 
84,444 
3,280,000 
3,536,124 
1,500,000 
1,491,667 
2,725,000 
2,386,187 
1,000,000 
830,873 
20,000 
4,890 
192,731 
221,961 
850,000 
328,350 
-694,000 
653,070 
119,971 
111,905 
101,474 
100,521 
30,000 
17,639 
150,550 
147,851 
63,178 
78,430 
7,700,000 
3,189,472 
27,736 
15,655 
2. 
751 
Total to 
June 30, 1970 
g 27,167,3821,2 
27,167,382 
19,875,0973 
19,629,5193'4 
130,394 s 
130,394 s 
3,080,36350 
2,846,634 
3,547,0006 
3,043,429 
2,375,00051 
1,937,801 
29,215,5018 
29,180,631 
2,077,437 
2,062,3519 
1,927,21652 
1,271,93410 
19,329,72611 
18,348,8941 
238,154 
229,65112 
7,631,821 
7,631,82113 
1,057,936 
1,056,58814 
6,812,283115 
6,702,45516 
1,254,527 
1,240,70517 
30,200,935 
30,200,93518 
627,158 
619,17519 
21,035,0152o 
16,310,5342 
27,736 
15,6551

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 24-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
15. Fishtrap Lake, Ohio 
River Basin, Ky. 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
16. Grayson Lake, Ky. New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
17. John W. Flannagan New Work 
Dam & Reservoir, Approp. 
Ohio River Basin, Va. Cost 
Maint. 
Approp. 
Cost 
18. Kehoe Lake, Ky. New Work 
Approp. 
Cost 
19. Martin LPP, Ky. New Work 
Approp. 
Cost 
20. Massillon, Ohio New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
21. Middle Fork of Mud New Work 
River, W. Va. Approp. 
Cost 
22. Mill Creek Lake, New Work 
Ohio Approp. 
Cost 
23. Muskingum River DamsNew Work 
and Lakes, Ohio Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
24. Newark, Ohio New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
25. North Branch of New Work 
Kokosing Lake, Ohio Approp. 
Cost 
26. North Fork of Pound New Work 
Lake, Va. Approp. 
Cost 
Maint. 
Approp. 
Cost 
$ 6,110,000 $ 6,980,000 $ 173,680 
6,143,229 3,792,300 3,627,194 
-12,594 111,500 
- 11,587 98,331 
7,078,000 - - 
5,592,377 2,063,590 508,371 
23,000 85,780 121,500 
21,985 86,426 114,567 
-30,000 50,000 60,000 
883,519 382,602 85,299 
98,000 126,751 175,000 
102,044 132,299 155,902 
- 100,000 206,000 
- 70,546 136,679 
- 65,000 92,000 
- 25,025 52,291 
4,100 2,756 7,900 
4,533 6,372 7,314 
-30,000 -50,000 30,000 
74,760 334,826 71,524 
100,000 455,000 403,000 
121,717 203,953 218,280 
25,775 -19,884 30,014 
149,010 - 1,367 
547,300 490,753 644,200 
529,676 507,679 586,884 
8,600 
6,686 
397,000 
170,627 
25,000 
466,797 
65,000 
54,824 
9,754 
12,843 
355,000 
579,405 
77,721 
84,887 
97,508 
7,200 
6,188 
600,000 
457,623 
25,000 
67,077 
99,700 
93,957 
752 
$ 128,000 
770,406 
160,521 
163,126 
25,000 
80,478 
159,670 
159,411 
30,500 
27,264 
215,385 
208,375 
149,500 
200,946 
144,200 
31,019 
7,015 
5,248 
-6,838 
187 
5,800 
55,177 
30,000 
6,838 
1,259,097 
1,001,848 
75,000 
4,733 
5,043 
800,000 
179,686 
16,000 
10,051 
119,028 
118,463 
$ 52,471,19022 
52,300,828 
284,616 
273,04424 
18,445,3795s 
17,659,37425 
389,950 
382,38926 
19,865,50027 
19,795,058 
769,236 
742,72629 
455,500 
408,171 
301,20056 
108,335 
8,139,40630 
8,139,40630 
112,109 
109,756 
517,375 
517,375 
1,121,300 
708,444 
41,012,28831 
40,947,479 
9,434,411 
9,106,72133 
61,94534 
61,94534 
920,91657 
845,916 
515,991 
515,289 
2,401,0005s 8 
1,608,397 
6,166,04835 
6,120,055 
387,615 
380,748

TABLE 24-A (Continued) 
See 
Section 
in Text Project Funding 
27. Ohio River Basin New Work 
Approp. 
Cost 
28. Paint Creek Lake, New Work 
Ohio River Basin, Approp. 
Ohio Cost 
29. Paintsville Lake, New Work 
Ky. Approp. 
Cost 
30. R. D. Bailey Lake, New Work 
W. Va. Approp. 
Cost 
31. Rockcastle Creek, New Work 
Inez, Ky. Approp. 
Cost 
32. Roseville, Ohio New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
33. Salt Creek Lake, New Work 
Ohio Approp. 
Cost 
34. South Williamson, New Work 
Ky. Approp. 
Cost 
35. Summersville Lake, New Work 
Ohio River Basin, Approp. 
W. Va. Cost 
Maint. 
Approp. 
Cost 
36. Sutton Lake, Ohio New Work 
River Basin, W. Va. Approp. 
Cost 
Maint. 
Approp. 
Cost 
37. Tom Jenkins Dam, New Work 
Ohio River Basin, Approp. 
Ohio Cost 
Maint. 
Approp. 
Cost 
38. Utica Lake, Ohio New Work 
Approp. 
Cost 
39. West Fork Lake, Ohio New Work 
River Basin, W. Va. Approp. 
Cost 
40. Yatesville Lake, Ky. New Work 
Approp. 
Cost 
HUNTINGTON, W. VA., DISTRICT 
COST AND FINANCIAL STATEMENT 
FY 67 FY 68 FY 69 FY 70 
3,100,000 
3,024,629 
185,000 
157,662 
1,500,000 
628,282 
3,695 
10,900 
1,935 
10,000 
35,566 
25,258 
250,000 
1,104,934 
111,000 
111,345 
5,000 
111,429 
160,000 
164,734 
50,000 
3,083 
38,000 
38,078 
173,000 
144,815 
3,045,000 
2,869,832 
200,000 
186,217 
4,000,000 
4,342,225 
-5,000 
12,332 
2,913 
12,124 
2,611 
307,492 
44,128 
875,000 
600,253 
146,825 
147,314 
146,600 
71,469 
175,183 
172,665 
423 
54,255 
58,717 
200,000 
164,730 
2,700,000 
2,206,747 
245,900 
277,394 
9,770,000 
6,765,393 
127,700 
3,945 
4,700 
3,868 
3,100 
14,225 
-60,000 
64,324 
200,000 
730,204 
185,600 
180,146 
111,468 
25,166 
257,800 
200,728 
-46,482
11 
70,000 
67,330 
131,000 
96,320 
196,000 
233,898 
2,400,000 
1,810,980 
157,000 
100,626 
9,100,000 
5,997,915 
-4,037 
216,962 
4,329 
1,665 
232,000 
136,552 
500,000 
245,648 
38,964 
254,022 
258,661 
2,000 
18,153 
330,848 
307,234 
57,692 
57,663 
80,500 
79,304 
240,000 
219,673 
181,000 
195,060 
Total to 
June 30, 1970 
$ 371,14538 
371,145 
12,862,00059 
11,481,72539 
787,900 
721,898 
25,725,33440,60 
18,986,46340,41 
775,60061 
266,986 
910,785 
910,785 
41,242 
37,747 
708,100 
612,199 
796,492 
393,84942 
47,824,5706 
47,427,55043 
759,947 
755,011 4 4 
36,341,90945,64 
36,148,35646 
1,619,162 
1,528,1784 
2,086,50348 
2,086,50348 
679,464 
676,60749 
80,500 
79,304 
386,000 
330,993 
750,000 
738,503 
753

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COST AND FINANCIAL STATEMENT 
1. Includes $4,294,612 for New Work for previous projects. 
2. Includes $4,498,636 emergency relief funds and 
$9,004,800 public works funds. 
3. Includes $3,883,513 for Maintenance for previous 
projects. 
4. Excludes surplus property valued at $12,850 transferred 
to project without reimbursement. 
5. Public works acceleration funds. 
6. Excludes $40,110 contributed by local interests. 
7. Includes $9,698 public works acceleration, $43,700 Code 
711 and $543,960 emergency relief funds. 
8. Includes $9,698 public works acceleration, $8,830 Code 
711 and $543,960 emergency relief funds. Excludes surplus 
property valued at $26,839 transferred to project without 
reimbursement. 
9. Excludes surplus property valued at $10,725 transferred 
to project without reimbursement. 
10. Excludes surplus property valued at $2,015 transferred to 
project without reimbursement. 
11. Excludes surplus property valued at $796 transferred 
from project without reimbursement. 
12. Excludes surplus property valued at $117,746 transferred 
to project without reimbursement. 
13. Excludes surplus property valued at $10,176 transferred 
to project without reimbursement. 
14. Excludes surplus property valued at $1,991 transferred 
from project without reimbursement. 
15. Includes $23,087 public works acceleration and $287,781 
Code 711 funds. 
16. Includes $23,087 public works acceleration and $177,953 
Code 711 funds. Excludes surplus property valued at $17,200 
transferred to project without reimbursement. 
17. Excludes surplus property valued at $2,021 transferred to 
project without reimbursement. 
18. Excludes surplus property valued at $770 transferred 
from project without reimbursement. 
19. Excludes surplus property valued at $1,003 transferred to 
project without reimbursement. 
20. Excludes surplus property valued at $24,496 transferred 
to project without reimbursement. 
21. Excludes surplus property valued at $36 transferred to 
project without reimbursement. 
22. Includes $10,000 Code 712 funds. 
23. Includes $10,000 Code 712 funds. Excludes surplus 
property valued at $24,950 transferred from project without 
reimbursement. 
24. Excludes surplus property valued at $10,136 transferred 
to project without reimbursement. 
25. Excludes surplus property valued at $4,766 transferred 
from project without reimbursement. 
26. Excludes surplus property valued at $921 transferred to 
project without reimbursement. 
27. Includes $80,000 Code 711 funds. 
28. Includes $9,899 Code 711 funds. Excludes surplus 
property valued at $10,194 transferred to project without 
reimbursement. 
29. Excludes surplus property valued at $9,219 transferred to 
project without reimbursement. 
30. Excludes $477,813 contributed funds. 
31. Includes $27,190,000 National Industrial Recovery Act 
funds and $293,359 Code 711 funds. 
32. Includes $27,190,000 National Industrial Recovery Act 
funds and $28,550 Code 711 funds. 
33. Excludes surplus property valued at $19,987 transferred 
to project without reimbursement. 
34. Public works acceleration funds. 
35. Includes $41,000 Code 711 funds. 
36. Includes $8,005 Code 711 funds. Excludes surplus 
property valued at $12,695 transferred from project without 
reimbursement. 
37. Excludes surplus property valued at $2,082 transferred to 
project without reimbursement. 
38. Excludes $10,920 emergency relief funds. 
39. Excludes surplus property valued at $8,715 transferred to 
project without reimbursement. 
40. Includes $5,534 obligated and expended from 
Consolidated Funds, Army. 
4L Excludes surplus property valued at $14,703 transferred 
to project without reimbursement. 
42. Excludes surplus property valued at $3,008 transferred to 
project without reimbursement. 
43. Excludes surplus property valued at $11,382 transferred 
from project without reimbursement. 
44. Excludes surplus property valued at $40,525 transferred 
to project without reimbursement. 
45. Includes $287,843 public works acceleration and 
$1,135,668 Code 711 funds. 
46. Includes $287,843 public works acceleration and 
$958,192 Code 711 funds. Excludes surplus property valued at 
$30,363 transferred from project without reimbursement. 
47. Excludes surplus property valued at $38,186 transferred 
from project without reimbursement. 
48. Includes $30,000 public works acceleration and $8,064 
Code 711 funds. Excludes $639,660 contributed funds. 
49. Excludes surplus property valued at $2,491 transferred to 
project without reimbursement. 
50. Includes $200,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
51. Includes $200,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
52. Inlcudes $150,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
53. Includes $780,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
54. Includes $465,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
55. Includes $700,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
56. Includes $150,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
57. Includes $75,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
58. Includes $750,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
59. Includes $240,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
60. Includes $835,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
6L Includes $500,000 placed in FY 1970 reserve for 
allocation in FY 197L 
62. Includes $400,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
63. Includes $380,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
64. Includes $165,000 placed in FY 1970 reserve for 
allocation in FY 1971. 
754 
TABLE 24-A (Continued)

HUNTINGTON, W. VA., DISTRICT 
TABLE 24-B KANAWHA RIVER, W. VA.: 
TOTAL COST OF EXISTING PROJECT TO JUNE 30, 1970 
(See Section 2 of Text) 
Operations & 
Maintenance, 
Name of Project New Work General Rehabilitation Total 
Regular $ 9,369,3341 $19,629,5192 $28,998,853 
Public 9,004,800 9,004,800 
Emergency relief 4,498,636 4,498,636 
Public Works - $130,394 130,394 
Acceleration, 
Executive, 1963 
Total $22,872,7703 $19,629,519 $130,394 $42,632,6834 
1. $5,159,879 expended between July 1884 and June 30, 1936, 3. Excludes $4,294,612 expended for New Work on previous 
on operation and care of work improvement under provisions of projects. 
permanent indefinite appropriations for such purposes, of which 4. Excludes surplus property valued at $12,850 transferred to 
$1,276,366 expended on existing project. project without reimbursement. 
2. Includes $3,883,513 expended for maintenance on previous 
projects. 
TABLE 24-C OTHER AUTHORIZED NAVIGATION PROJECTS 
Cost to June 30, 1970 
For Last 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Big Sandy River, W. Va and Ky., including 
Levisa and Tug Forks 1952 $1,586,236 $1,471,299 
Elk River, W. Va.3 
1903 30,259 
Gauley River, W. Va.4 1903 14,761 
Guyandot River, W. Va.5 1915 27,500 
Little Kanawha River, W. Va.6 1960 470,536 1,023,854 
Muskingum River, Ohio7 1955 301,912 6,171,8978 
New River, Va. and W. Va.5 1899 109,691 
Scioto River at Portsmouth, Ohio9 1953 10,951 16,593 
1. Excludes $131,473 contributed by local interest for 
maintenance of lock 1 in fiscal years 1953-62, inclusive, in 
addition $98,512 expended from operation and maintenance 
funds for repair of lock and dam 3 for local water supply and 
recreation. In addition, $140,068 expended from funds 
transferred from Department of Commerce, under accelerated 
public works program, for repairs of eroded bank at lock 3 on 
Big Sandy River, at Louisa, Ky. 
2. Operation and maintenance suspended June 30,1952. 
3. Work closed September 1902. Property transferred to 
Kanawha River improvements. 
4. Work closed September 1902. Abandonment 
recommended in H. Doc. 467, 69th Cong. 
5. Work suspended. 
6. Operation and maintenance suspended June 30,1951. 
7. Collections from licensed non-Federal hydroelectric 
utilities for use of dams on Muskingum River for fiscal years 
1923-1953 were $79,154. 
8. Excludes $5,663 and $378, respectively, contributed 
funds for reconstruction of dam 10, and intermittent operation 
of lock 1 for benefit of Marietta Boat Club, Inc., subsequent to 
June 30,1954. 
9. Private Law 945,August 31,1954, authorized Secretary of 
Treasurer to pay Portsmouth Sand and Gravel Co. $75,000 in 
full settlement of claims against Government for damages 
resulting from change in Scioto River Channel 
755

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OHIO RIVER BASIN (HUNTINGTON DISTRICT): 
LOCAL PROTECTION PROJECTS 
(See Section 27 of Text) 
Estimated cost 3 
Type of 
Location 1' 2 protection Federal Non-Federal Total 
Aberdeen, Ohio 
Ashland, Ky. 
Athalia, Ohio 
Augusta, Ky. 
Belpre, Ohio 
Brooklyn, W. Va. 
Buena Vista, Ohio 
Burlington, Ohio 
Catlettsburg, Ky. 
Ceredo-Kenova, W. Va. 
Chambersburg, Ohio 
Chesapeake, Ohio 
Cheshire, Ohio 
Chilo, Ohio 
Clarington, Ohio 
Clifton, W. Va. 
Coal Grove, Ohio 
Dover, Ky. 
Friendly, W. Va. 
Fullerton, Ky. 
Galax (New River Basin), Va. 
Gallipolis, Ohio 
Greenup, Ky. 
Hanging Rock, Ohio 
Hartford, W. Va. 
Henderson, W. Va. 
Higginsport, Ohio 
Hockingport, Ohio 
Huntington, W. Va. 
Ironton, Ohio 
Letart 
Letart Falls, Ohio 
Manchester, Ohio 
Mapleshade, Ohio 
Marietta, Ohio 
Mason, W. Va. 
Massillon (Muskingum River Basin), 
Ohios 
Maysville, Ky. 
Middleport, Ohio 
Miller, Ohio 
Millwood, W. Va. 
Newark (Muskingum River Basin), 
Ohios 
New Martinsville, W. Va. 
New Matamoras, Ohio 
Newport, Ohio 
Normal, Ky. 
Parkersburg, W. Va. 
Point Pleasant, W. Va. 
Pomeroy, Ohio 
Portland, Ohio 
Portsmouth-New Boston, Ohio 
Powhatan Point, Ohio 
Proctor, W. Va. 
Proctorville, Ohio 
Racine, Ohio 
Ravenswood, W. Va. 
Ripley, Ohio 
Riverview, W. Va. 
Wall and levee 
Wall and levee 
Levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Levee 
Wall and levee 
Wall and levee 
Wall and levee 
Levee 
Levee 
Wall and levee 
Wall and levee 
Levee 
Wall and levee 
Levee 
Wall and levee 
Wall and levee 
Channel improvement 
and levee 
Wall and levee 
Wall and levee 
Levee 
Wall and levee 
Levee 
Wall and levee 
Levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Levee 
Levee 
Wall and levee 
Wall and levee 
Channel improvement, 
wall and levee 
Wall and levee 
Wall and levee 
Levee 
Wall and levee 
Channel improvement 
and levee 
Channel improvement 
and levee 
Wall and levee 
Levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Wall and levee 
Levee 
Resettlement 
Wall and levee 
Wall and levee 
Wall and levee 
Levee 
TABLE 24-D 
$1,430,000 
3,717,662 
630,000 
1,220,000 
3,570,000 
5,200,000 
593,000 
146,000 
3,854,361 
2,757,234 
1,600,000 
330,000 
419,000 
899,000 
2,710,000 
230,000 
888,000 
648,000 
655,000 
1,090,000 
480,536 
2,670,000 
2,660,000 
467,000 
2,880,000 
437,000 
944,000 
568,000 
7,168,386 
2,641,324 
938,000 
992,000 
1,330,000 
1,330,000 
14,000,000 
1,040,000 
8,139,406 
6,493,747 
6,260,000 
519,000 
843,000 
845,916 
4,670,000 
2,090,000 
318,000 
648,000 
6,652,827 
2,913,780 
16,500,000 
1,040,000 
9,813,074 
4,720,000 
334,000 
2,700,000 
985,000 
1,470,000 
1,940,000 
881,000 
$ 55,000 
313,000 
187,000 
620,000 
448,000 
226,000 
197,000 
117,000 
300,000 
265,000 
53,000 
139,000 
147,000 
120,000 
249,000 
113,000 
55,000 
585,000 
61,000 
178,000 
185,000 
839,000 
512,000 
155,000 
222,000 
188,000 
320,000 
242,000 
1,509,3006 
669,000 
123,000 
126,000 
377,000 
298,000 
822,000 
238,000 
477,8137 
563,7008 
490,000 
173,000 
134,000 
21,000 
643,000 
285,000 
84,000 
235,000 
300,000 
278,000 
346,000 
104,000 
525,00011 
397,000 
121,000 
120,000 
106,000 
810,000 
115,000 
$1,485,000 
4,030,6624 
817,000 
1,840,000 
4,018,000 
5,426,000 
790,000 
263,000 
4,154,3614 
3,022,2344 
1,653,000 
469,000 
566,000 
1,019,000 
2,959,000 
343,000 
943,000 
1,233,000 
716,000 
1,268,000 
665,5364 
3,509,000 
3,172,000 
622,000 
3,102,000 
625,000 
1,264,000 
810,000 
8,677,6864 
3,310,324 
1,061,000 
1,118,000 
1,707,000 
1,628,000 
14,822,000 
1,278,000 
8,617,2194 
7,057,4474 
6,750,0009 
692,000 
977,000 
866,91610,4 
5,313,000 
2,375,000 
402,000 
883,000 
6,952,8274 
3,191,7804 
16,846,000 
1,144,000 
10,338,0744 
5,117,000 
455,000 
2,700,000 
1,105,000 
1,576,000 
2,750,000 
996,000 
756

TABLE 24-D (Continued) 
HUNTINGTON, W. VA., DISTRICT 
OHIO RIVER BASIN (HUNTINGTON DISTRICT): 
LOCAL PROTECTION PROJECTS 
(See Section 27 of Text) 
Estimated cost3 
Type of 
Location 1'2 protection Federal Non-Federal Total 
Roseville (Muskingum River Basin), Channel improve- $ 910,785 $ 62,000 $ 972,7854,10 
Ohio s ment. 
Russell, Ky. Levee (backwater 237,193 10,000 247,1934 
protection) 
St. Marys, W. Va. Wall and levee 1,510,000 139,000 1,649,000 
Sardis, Ohio Levee 285,000 60,000 345,000 
Sciotoville, Ohio Wall and levee 1,460,000 377,000 1,837,000 
Sistersville, W. Va. Wall and levee 1,770,000 269,000 2,039,000 
South Point, Ohio Wall and levee 992,000 117,000 1,109,000 
South Portsmouth, Ky. Levee 370,000 137,000 507,000 
Syracuse, Ohio Levee 1,220,000 100,000 1,320,000 
Vanceburg, Ky. Wall and levee 2,490,000 685,000 3,175,0009 
Waverly, W. Va. Wall and levee 3,480,000 251,000 3,731,000 
Williamstown, W. Va. Wall and levee 2,580,000 136,000 2,716,000 
Woodlands, W. Va. Levee 206,000 28,000 234,000 
Zanesville (Muskingum River), Ohio Wall and levee 8,110,000 13,000,000 21,110,000 
1. All projects are on Ohio River, unless otherwise noted. 
2. Also see "Other authorized flood control projects," for all 
projects except: Massillon, Newark, and Roseville, Ohio. 
3. Latest cost estimate revised 1954, unless otherwise noted. 
4. Construction completed 
5. For details see individual report. 
6. Includes $2,300 construction funds contributed by local 
interests. 
7. Construction funds contributed by Massillon Conservancy 
District. 
8. Includes $38,700 construction funds contributed by local 
interests. 
9. Latest cost estimate revised, 1960. 
10. Includes construction costs expended in fiscal year 1963 
and 1964. 
11. Includes $15,150 construction funds contributed by local 
interests. 
757

TABLE 24-E 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OHIO RIVER BASIN (HUNTINGTON DISTRICT): RESERVOIRS 
(See Section 27 of Text) 
Tributary basin Total estimated 
and reservoir Stream cost 1 
Big Sandy: 
Dewey, Ky. Johns Creek $ 6,881,2834 
Fishtrap, Ky. Levisa Fork 53,900,0004 
Haysi, Va. Russell Fork 10,100,000 
John W. Flannagan, Va.2 Pound River 19,880,5004 
Guyandot: 
Mud River, W. Va.s Mud River 10,600,000 
Hocking: 
Logan, Ohio5 Clear Creek 4,230,000 
Tom Jenkins, Ohio2 East Branch of Sunday Creek 2,086,5033,6 
Kanawha: 
Big Bend, W. Va.5 Greenbrier River 13,900,000 
Birch, W. Va. s Birch River 6,450,000 
Bluestone, W. Va.2 New River 29,190,5013 
Moores Ferry, Va. 5 New River 25,600,000 
Poca, W. Va. Pocatalico River 21,600,000 
Summersville, W. Va.2 Gauley River 47,845,0004 
Sutton, W. Va.2 Elk River 36,384,809 
Little Kanawha: 
Burnsville, W. Va.2 Little Kanawha River 33,700,0004 
Leading Creek, W. Va.5 Leading Creek 27,500,0004 
West Fork, W. Va.2 '5 West Fork 26,400,0004 
Muskingum: 
Dillon, Ohio2 Licking River 30,218,2354 
Frazeysburg, Ohio5 Wakatomika Creek 7,200,000 
Millersburg, Ohio5 Killbuck Creek 12,000,000 
Muskingum River Reservoirs 
(System of 14 reservoirs)2 On various streams 41,119,2884 
Scioto: 
Big Darby Creek, Ohio2 Big Darby Creek 55,700,0004 
Deer Creek, Ohio2 Deer Creek 19,600,0004 
Delaware, Ohio2 Olentangy River 7,631,8214 
Paint Creek, Ohio2 Paint Creek 24,700,0004 
Rocky Fork, Ohio 5 '8 Rocky Fork 4,410,0009 
Twelvepole Creek: 
East Lynn, W. Va. 2 East Fork 25,800,0004 
1. Latest cost estimate revision 1954, unless otherwise noted. 
2. For details see individual report. 
3. Construction completed. 
4. Latest cost estimate revision 1970. 
5. Also see "Other Authorized Flood Control Projects." 
6. Excludes $785,000 contributed by local interests. 
7. Latest cost estimate revision 1960. 
8. See annual report for 1950 for individual report. 
9. Total cost $6,349,000, additional $1,939,000 to be contributed 
by local interests. 
758

HUNTINGTON, W. VA., DISTRICT 
TABLE 24-F AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
OHIO RIVER BASIN - HUNTINGTON DISTRICT (See Section 27 of Text) 
Aug. 28, 1937 Construct levees, floodwalls, and drainage structures for Flood Control Committee Doc. 1, 
protection of cities and towns in Ohio River Basin. Projects 75th Cong., 1st Sess. 
to be selected by Chief of Engineers with approval of 
Secretary of War at a cost not to exceed $24,877,000 for 
construction. 
June 28, 1938 Approved general comprehensive plan for flood control and Flood Control Committee Doc. 1, 
other purposes in Ohio River Basin as may be advisable in 75th Cong., 1st Sess. 
discretion of Secretary of War and Chief of Engineers, and 
for initiation and partial accomplishment of plan, authorized 
$75 million for reservoirs and $50,300, for local flood 
protection works. 
Aug 11, 1939 Provides Muskingum River Valley dams and reservoirs as set 
forth in official plan of Muskingum watershed conservancy 
district shall be included in flood control plan of Ohio 
River Basin. 
Aug 18, 1941 Additional $45 million for prosecution of comprehensive plan 
for Ohio River Basin. 
Dec 22, 1944 Additional $70 million for further prosecution of comprehensive H. Doc 762, 77th Cong., 2nd Sess. 
plan for Ohio River Basin, including Burr Oak Reservoir on 
Hocking River, Ohio, at an estimated cost of $400,000. 
July 24, 1946 Additional $125 million for further prosecution of H. Doc 506, 78th Cong., 1st Sess. 
comprehensive plan including local flood protection works 
at Galax, Va., on Chestnut Creek, at an estimated cost of 
$276,125. 
May 17, 1950 Additional $100 million for prosecution of comprehensive plan 
for Ohio River Basin. 
Dec 30, 1963 Additional $150 million for further prosecution of 
comprehensive plan for flood control and other purposes in 
Ohio River Basin. 
June 18, 1965 Additional $89 million for further prosecution of comprehensive H. Doc 6755, 89th Cong., I1st 
plan for Ohio River Basin. Sess. 
Aug 13, 1968 Additional $35 million for further prosecution of comprehensive S.3710, 90th Cong. 
plan for Ohio River Basin. 
June 19, 1970 Additional $69 million for further prosecution of comprehensive HR 15166, 91st Cong., 2nd Sess. 
plan for Ohio River Basin. 
759

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 24-G OHIO RIVER BASIN (HUNTINGTON DISTRICT): 
PROJECT COSTS TO JUNE 30, 1970 
(See Section 27 of Text) 
New Work 
Total Total Cost 
Appropriated to 
Project to June 30, 1970 June 30, 1970 
Local protection projects: 
Aberdeen, Ohio $ 1,334 $ 1,334 
Augusta, Ky. 11,5771 11,5771 
Coal Grove, Ohio 3,389 3,389 
Columbus, Ohio 11,237 11,237 
Greenup, Ky. 4,962 4,962 
Manchester, Ohio 17,721 17,721 
Middleport, Ohio 9,7833 9,7833 
Ripley, Ohio 7,523 7,523 
Reservoirs: 
Big Walnut, Ohio 110,622 110,622 
Birch, W. Va. 45,736' 45,736 1 
Clendenin, W. Va. 33,000 33,000 
Frazeysburg, Ohio 5,000 5,000 
Haysi, Va. 2,656 2,656 
Leading Creek, W. Va. 15,284' 15,284 
Rocky Fork, Ohio 91,321 91,321 
Total Ohio River Basin 371,1454 371,1454 
1. Allocation and costs for feasibility study. 
2. Includes $9,137 emergency relief funds. 
3. Includes $1,783 emergency relief funds. 
4. Includes $10,920 emergency relief funds (Basin total). 
760

HUNTINGTON, W. VA., DISTRICT 
INSPECTION OF FLOOD CONTROL PROJECTS 
(See Section 41 of Text) 
TABLE 24-H
Flood Control Works Inspected 
Ashland, Ky. 
Beaver Creek Wayland to Garrett, Ky. 
Beaver Creek, Langley, Ky. 
Bramwell, W. Va. 
Cairo, W. Va. 
Catlettsburg, Ky. 
Ceredo-Kenova, W. Va. 
East Rainelle, W. Va. 
Fishing Creek, Pine Grove, W. Va. 
Fourpole Creek, Huntington, W. Va. 
Galax, Va. 
Grahn, Ky. 
Griffithsville, Yankey, W. Va. 
Hitchins, Ky. 
Huntington, W. Va. 
Ironton, Ohio 
Jacksonburg, W. Va. 
Kokosing River, Mount Vernon, Ohio 
Maysville, Ky. 
McDowell, Drift, Ky. 
Montcalm, W. Va. 
Nimishillen Creek, Canton, Ohio 
Olive Hill, Ky. 
Paint Creek, Chillicothe, Ohio 
Paint Creek, Washington Court House, Ohio 
Parkersburg, W. Va. 
Point Pleasant, W. Va. 
Portsmouth-New Boston, Ohio 
Prestonsburg, Ky. 
Princeton, W. Va. 
Richwood-Fenwick, W. Va. 
Russell, Ky. 
Smithfield, W. Va. 
Utica, Ohio 
West Union, W. Va. 
Williamson, W. Va. 
761 
Dates of Inspection 
Oct. 1969, May 1970 
Aug. 1969 
Aug. 1969 
Sept. 1969 
Sept. 1969 
Oct. 1969, May 1970 
Nov. 1969, May 1970 
Aug. 1969 
Sept. 1969 
Aug. 1968 
Sept. 1969 
Aug. 1969 
July 1969 
Aug. 1969 
Dec. 1969, May 1970 
Dec. 1969, May 1970 
Sept. 1969 
Aug. 1969 
Dec. 1969, May 1970 
Nov. 1969 
Sept. 1969 
Aug. 1969 
Aug. 1969 
Oct. 1969 
Oct. 1969 
Oct. 1969, April 1970 
Oct. 1969, May 1970 
Oct. 1969, May 1970 
Sept. 1969 
Oct. 1969 
Oct. 1969, May 1970 
Sept. 1969 
Oct. 1969 
Sept. 1969 
Sept. 1969, June 1970

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 24-I OTHER AUTHORIZED FLOOD CONTROL PROJECTS
Cost to June 30, 1970 
For Last 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Local protection projects: 
Aberdeen, Ohio - $ 1,334 $ - 
Ashland, Ky.2 1954 3,703,9523 
Athalia, Ohio1 - - 
Athens, Ohio - 3,043,428 
Augusta, Ky.1 - 11,577 
Belpre, Ohio -- 
Brooklyn, W. Va.1 -- 
Buena Vista, Ohio - - 
Burlington, Ohio1 - -- 
Catlettsburg, Ky.2 1963 3,854,361 
Ceredo-Kenova, W. Va.2 1955 2,743,344 - 
Chambersburg, Ohio - - - 
Chesapeake, Ohio - - - 
Cheshire, Ohio - - - 
Chillicothe, Ohio - - 
Chilo, Ohio - - - 
Clarington, Ohio - - 
Clifton, W. Va.1 
Coal Grove, Ohio - 3,389 
Columbus, Ohio - 11,237 
Dover, Ky.1 - - 
East Rainelle, W. Va.2 1962 614,598 
Friendly, W. Va.1 - - 
Fullerton, Ky. - - 
Galax, Va.2 1953 480,536 
Gallipolis, Ohio - - 
Greenup, Ky.1 - 4,962 
Hanging Rock, Ohio1 -- 
Hartford, W. Va.1 
Henderson, W. Va. 
Higginsport, Ohio1 
Hockingport, Ohio - - 
Huntington, W. Va.2 1956 7,146,6663 
Ironton, Ohio2 1952 2,569,508 
Letart, W. Va.1 -- 
Letart Falls, Ohio - 
Manchester, Ohio 17,721 
Mapleshade, Ohio1 - - 
Marietta, Ohio1 
Martin, Ky. - 108,336 
Mason, W. Va. - 
Maysville, Ky.2 1959 6,493,747 
Middleport, Ohio - 9,783 
Miller, Ohio1 
Millwood, W. Va.1 
New Martinsville, W. Va. 
762

HUNTINGTON, W. VA., DISTRICT 
TABLE 24-I (Continued) OTHER AUTHORIZED FLOOD CONTROL PROJECTS
Cost to June 30, 1970 
For Last 
Full Report Operation 
See Annual and 
Project report for Construction Maintenance 
New Matamoras, Ohio1 
Newport, Ohio1 -- 
Normal, Ky.1 - - - 
Parkersburg, W. Va.2 1955 6,652,8273 
Point Pleasant, W. Va.2 1953 2,910,6283 
Pomeroy, Ohio - - - 
Portland, Ohio - - - 
Portsmouth-New Boston, Ohio2 1956 9,806,4243 - 
Powhatan Point, Ohio1 - - 
Princeton, W. Va.2 1962 808,750 - 
Proctor, W. Va.1 - - 
Proctorville, Ohio 
Racine, Ohio 
Ravenswood, W. Va.1 - - 
Ripley, Ohio1 - 7,523 - 
Riverview, W. Va. - - 
Russell, Ky.2 1953 237,193 - 
St. Marys, W. Va. 
Sardis, Ohio1 
Sciotoville, Ohio 1 
Sistersville, W. Va.1 
South Point, Ohio1 
South Portsmouth, Ky. 
Syracuse, Ohio 
Vanceburg, Ky.1 
Waverly, W. Va.1 
Williamson, W. Va.2 1964 1,056,166 - 
Williamstown, W. Va.1 
Woodlands, W. Va.1 - - 
Zanesville, Ohio1 
Reservoirs: 
Big Bend, W. Va.1 _ 
Birch, W. Va. - 45,736 - 
Frazeysburg, Ohio - 5,000 - 
Haysi, Va.1 - 2,656 - 
Leading Creek, W. Va. - 15,284 - 
Logan, Ohio - - 
Millersburg, Ohio1 - - - 
Moores Ferry, Va.1 
Mud River, W. Va.1 - - - 
Panther Creek, W. Va. 
Poca, W. Va. 1 
Rocky Fork, Ohio1 1950 19,321 - 
1. Inactive. 
2. Completed. 
3. Includes cost of flood wall rehabilitation. 
763

TABLE 24-J 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
(See Section 43 of Text) 
Flood Control activities pursuant to Section 205, 
P.L. 858, 80th Congress, as amended (preauthorization) 
Study Identification Fiscal Year Costs 
Cranes Nest River $ 3,227 
Dry Fork of Little.Fork, Ky. 2,250 
East Branch of Nimishillen Creek, Ohio 13,174 
Hocking River at Logan, Ohio 2,415 
Hocking River at Nelsonville, Ohio 2,486 
Johns Creek at Meta, Ky. 2,233 
Moxahala Creek at Crooksville, Ohio 11,863 
Pikesville, Ky. 233 
Tuscarawas River, Summit Co., Ohio 885 
West Williamson, W. Va. 9,130 
Snagging and clearing navigable streams and 
tributaries in the interest of flood control 
(Sec. 208, 1954 Flood Control Act, P.L. 780, 
83rd Congress). 
Project and Location 
Dry Fork of Tug Fork, W. Va. 1,2 
Hocking River at Rockbridge, Ohio _ 1,2 
Paint Creek, South of Chillicothe, Ohio 1351,2 
1. Construction funds received. 
2. Awaiting completion of local requirements. 
3. Construction completed. 
TABLE 24-K COMPLETED FLOOD PLAIN STUDIES 
(See Section 45 of Text) 
Date Federal 
Location Requesting Agency Completed Costs 
Alum Creek, Ohio Ohio Department of Dec. 1967 $23,714 
Natural Resources, Div. 
of Water 
Big Walnut Creek, Ohio Department of Sep. 1968 22,732 
Ohio Natural Resources, Div. 
of Water 
Black Lick Creek, Ohio Department of June 1962 1,007 
Ohio Natural Resources, Div. 
of Water 
Mud River, W. Va. West Virginia Department Feb. 1969 25,144 
of Natural Resources, 
Div. of Water 
Nimishillen Cr. at Ohio Department of March 1967 25,970 
Canton, O. Natural Resources, Div. 
of Water 
Scioto-Olentangy Ohio Department of Jan. 1967 36,113 
Rivers Natural Resources, Div. 
of Water 
764

PITTSBURGH, PA., DISTRICT* 
This District comprises part of eastern Ohio, western 
Pennsylvania southwestern New York, northern West 
Virginia, and northwestern Maryland embraced in 
drainage basin of Ohio River and tributaries above 
mile 127 (below Pittsburgh), immediately upstream 
from New Martinsville, W. Va. 
IMPROVEMENTS 
Navigation Page 
1. Allegheny River, Pa .......................... 765 
2. Construction of locks and dams, Ohio 
R iver ....................................................... 766 
3. Lake Erie-Ohio River Canal, Ohio and 
Pa. . ............ .............................. 766 
4. Monongahela River, Pa. and W. Va. .. 767 
5. Open-channel work, Ohio River ........ 768 
6. Tygart Lake, W. Va. ........................ 768 
7. Youghiogheny River, Pa. and Md. ....... 768 
8. Other authorized navigation projects .... 769 
Flood Control 
9. Berlin Lake, Ohio River Basin, Ohio .. 769 
10. Black Fork at Hendricks, W. Va. ...... 770 
11. Buckhannon, W. Va .......................... 770 
12. Chartiers Creek, Pa ............................ 770 
13. Conemaugh River Lake, Ohio River 
Basin, Pa........................ ................ 771 
14. Crooked Creek Lake, Ohio River 
Basin, Pa. ................... ..................... 772 
15. DuBois, Pa . ........................ ............. 772 
16. East Branch, Clarion River Lake, Ohio 
River Basin, Pa ............................. 773 
17. Elkins, W . Va. ..................................... 773 
18. Johnstown, Pa. ............................... 773 
19. Kinzua Dam and Allegheny Reservoir, 
Ohio River Basin, Pa. and N. Y. .... 774 
20. Loyalhanna Lake, Ohio River Basin, 
Pa. . ........................... ........................... 775 
21. Mahoning Creek Lake, Ohio River 
Basin, Pa. .................... ................... 775 
22. 
23. 
24. 
25. 
26. 
27. 
28. 
29. 
30. 
31. 
32. 
33. 
34. 
35. 
36. 
37. 
38. 
39. 
40. 
41. 
42. 
43. 
44. 
Flood Control (cont.) Page 
Mosquito Creek Lake, Ohio River 
Basin, Ohio ....................... ................. 776 
Muddy Creek Dam, Pa. ...................... 776 
Ohio River Basin (Pittsburgh District) 777 
Punxsutawney, Ohio River Basin, Pa. . 777 
Ridgway and vicinity, Pa. ................... 777 
Rowlesburg Lake, W. Va. ................... 778 
Salamanca, N. Y. ................................... 778 
Shenango River Lake, Ohio River 
Basin, Pa. and Ohio ........................ 778 
Stonewall Jackson Lake, W. Va.......... 779 
Tenmile Creek at Marianna, Pa. ....... 780 
Tionesta Lake, Ohio River Basin, Pa. . 780 
Turtle Creek, Pa ................. ............. 781 
Union City Dam, Pa. .............................. 781 
West Branch Lake, Mahoning River, 
Ohio ........... ....................... ..... 782 
Woodcock Creek Lake, Pa. ............ 783 
Youghiogheny River Lake, Ohio River 
Basin, Pa. and Md. ........................... 783 
Youngstown, Ohio .............................. 784 
Inspection of completed flood control 
projects .......... .......................... 784 
Other authorized flood control projects 785 
Flood control work under special 
authorization ..................................... 785 
General Investigations 
Surveys ............................................. 
Collection and study of basic data ....... 
Research and development ..................... 
785 
785 
785 
NAVIGATION 
1. ALLEGHENY RIVER, PA. 
Location. Rises in northern Pennsylvania, flows 
northwestward into New York, thence generally 
southwestward to Pittsburgh, Pa., where it joins with 
Monongahela River to form the Ohio. It is 325 miles 
long. (See Geological Survey Charts for western 
Pennsylvania and southwestern New York.) 
Existing project. Provides for eight locks and dams to 
afford slack-water navigation from Pittsburgh, Pa., 
72 miles to above East Brady, Pa. Controlling depth 
through canalized portion is 9 feet at normal pool level, 
and channel width varies from minimum of 200 feet to 
full width of river at mouth. Cost of new work for 
completed project is $18,157,860. (See tables 25-B and 
25-C for authorizing legislation and locks of dams on 
Allegheny River, Pa.) 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
765 
451-584 0-72-49

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Local cooperation. Fully complied with. 
Terminal facilities. City of Pittsburgh constructed a 
modern wharf for river freight. There are numerous 
privately maintained terminals and docks, consisting of 
tipples, various types of hoists, chutes, and pipelines for 
use in loading and unloading coal, stone, sand, gravel, 
petroleum products, steel products, and other commodities. 
Transshipment of freight between river and 
railroads is handled at privatley owned river-to-rail 
terminals. Existing private terminals are adequate for 
shipments and receipt in Pittsburgh District of type of 
commerce now in existence. 
Operations and results during fiscal year. Operation and 
maintenance, general: Locks were operated as required 
and necessary repairs made to structures to 
maintain them in serviceable condition at cost of $570, 
748, maintenance repairs at locks and dams were 
accomplished at cost of $98,924. 
Condition at end of fiscal year. Existing project is 
complete, last lock was placed in service in 1938. All 
locks and dams are in good condition. Navigation 
channel has been widened at certain points and, in 
general, maintained to project depth, thus affording 
adequate depth for passage of commercial tows. 
2. CONSTRUCTION OF LOCKS AND 
DAMS, OHIO RIVER 
See this heading under Ohio River portion. 
3. LAKE ERIE-OHIO RIVER CANAL, 
OHIO AND PA. 
Location. In the Beaver-Mahoning and Grand River 
basins in western Pennsylvania and northeastern Ohio, 
between Lake Erie on the north and the Ohio River on 
the south. 
Existing project. Provides for a canal extending from 
the confluence of the Beaver and Ohio Rivers up the 
Beaver and the Mahoning Rivers by a series of seven 
locks and dams to a point near the north city limits of 
Warren, Ohio; thence by a land cut through the divide 
between the Ohio River and Lake Erie drainagebasins; 
thence through a summit reservoir formed by a 
dam across the Grand River near Harpersfield, Ohio; 
thence to Lake Erie. The total length of the canal 
would be about 120 miles. The combined lift of the 
south slope locks would be 159 feet and that of the 
north slope locks, 271 feet. Dual locks with usable 
dimensions of 84 feet by 720 feet would be provided. A 
proposed channel with a minimum depth of 12 feet and 
15 feet over lock sills and in restricted reaches will be 
provided. Minimum bottom width of channel will be 
300 feet except in reaches of Youngstown and Warren, 
Ohio, where developments along the river limit the 
width to 200 feet and 250 feet, respectively. Operation 
and maintenance of the locks and dams will be a 
Federal responsibility. Project was authorized by 1935 
River and Harbor Act. The Appropriation Committees 
directed in their reports in connection with the 
1968 Appropriation Bill that further planning should 
exclude navigation purposes and that planning work 
should include a reanalysis of reservoir's design and 
operation to make maximum provision for water 
supply storage, municipal and industrial water, water 
quality control, and other water resource purposes in 
absence of any requirements for navigation purposes. 
Estimated initial Federal cost for new work (1966) 
$968,000,000 (includes $9,545,000 reimbursable by 
non-Federal interests; estimated non-Federal cost is 
$67,700,000 (excludes required reimbursement.) 
Local cooperation. Local interests are required to 
provide without cost to the United States all lands, 
easements, and rights-of-way required for construction 
and subsequent maintenance of the navigation features 
of the project, except in the Grand River Reservoir and 
the divide cut, and for aids to navigation upon request 
of the Chief of Engineers, including suitable areas 
determined by the Chief of Engineers to be required in 
the general public interest for initial and subsequent 
disposal of spoil, and also necessary retaining dikes, 
bulkheads, and embankments therefor or the costs of 
such retaining works; hold and save the United States 
free from damages due to the construction, operation, 
and maintenance of the navigation features; bear a 
proportionate share of the cost of bridge alterations 
over the existing channels of the Beaver, Mahoning 
and Grand Rivers in accordance with principles of the 
Truman-Hobbs Act, as amended; assume all obligations 
of owning, including maintaining, operating, 
and replacing all railway and highway bridges altered 
or constructed as part of the multi-purpose project, 
including any additional cost of maintenance or 
operation which may be required because of the 
project; provide and maintain terminal and transfer 
facilities along the waterway and at the Lake Erie 
terminus adequate to handle the commerce which will 
use the waterway, with depths in the berthing areas 
and local access channels serving the navigation 
channel commensurate with the depths provided in 
related project areas, with terminal facilities at Lake 
Erie open to all on equal terms; accomplish all utility 
relocations and alterations from the mouth of the 
Beaver River to the beginning of the divide cut north of 
Warren, Ohio and from the northern dam of the Grand 
River Reservoir to the terminus at Lake Erie; not 
withdraw water for consumptive use, nor divert water 
around the locks, from the water supply provided by 
the project works; in accordance with the Federal 
Water Project Recreation Act administer project land 
and water areas for recreation and fish and wildlife 
enhancement; pay, contribute in kind, or repay (which 
may be through user fees) with interest one-half of the 
separable costs allocated to recreation and fish and 
wildlife enhancement, and bear all costs of operation, 
maintenance, and replacement of recreation and fish 
and wildlife lands and facilities the estimated cost of 
which is $9,545,000. Local political subdivisions in the 
States of Ohio and Pennsylvania have not been 
requested to submit assurances of local cooperation. 
However, State of Pennsylvania will not provide any of 
the local cooperation required for project. State of 
Ohio made no commitment pending further study of 
766

PITTSBURGH, PA., DISTRICT 
project. Coordination has been effected with various 
agencies relative to development of data pertinent to 
revised project purposes. 
Terminal facilities. None in the lower Beaver River 
area. The Lake Erie terminus remains to be determined. 
Operations and results during fiscal year. New work: 
Pursuant to Congressional directive all work incident 
to navigation elements of the project was terminated 
and future planning confined to the Grand River 
Reservoir. The reanalysis study of Grand River 
Reservoir's design and operation to make maximum 
provision for municipal and industrial water supply 
storage, water quality control and other water resource 
purposes in absence of any requirements for navigation 
continued. Letter-type report for ultimate submission 
to Congress was submitted to Division Engineer, Ohio 
River Division. 
Condition at end of fiscal year. The reanalysis report is 
complete to extent necessary for determination of 
project feasibility, a public hearing, and review by 
State of Ohio. State of Ohio has indicated it will not be 
in a position to provide a statement regarding its 
participation in water supply and recreational features 
of project until results of its current studies of Northeast 
Ohio Water Development Plan are known. This study 
is scheduled for completion in spring of 1971. Final 
report will be submitted thereafter. 
4. MONONGAHELA RIVER, PA. AND 
W. VA. 
Location. Formed by junction of Tygart and West 
Fork Rivers about 1 mile south of Fairmont, W. Va., 
and flows northerly for 128.7 miles to its junction with 
Allegheny River, forming Ohio River at Pittsburgh, 
Pa. (See Geological Survey Charts for southwestern 
Pennsylvania and northern West Virginia.) 
Previous project. For details see Annual Report for 
1963, page 1070. 
Existing project. Provides for improvement of river by 
9 locks and dams to afford slack-water navigation for 
its entire length from Pittsburgh to above Fairmont, W. 
Va. Original locks and dams 7, 8 and 9 were replaced 
by new locks and dam 7 and 8 in 1925. Increased traffic 
necessitated enlargement and improvement of locks 
and dams 1 to 6 between Pittsburgh and Rices 
Landing, Pa., by building two parallel chambers and 
fixed concrete dams during 1905 to 1932. Locks and 
dam 1 were eliminated in 1938 by raising Emsworth 
Dam, Ohio River. Reconstruction of lock 2 was 
completed in 1953 to provide two modern navigation 
chambers. Construction of Maxwell locks and dam and 
the reconstruction of dam 4 have allowed for removal 
of obsolete locks and dams 5 and 6. Small and 
antiquated original locks and dams 10 to 15, inclusive, 
have been replaced by three modern structures. 
Morgantown lock and dam, initial step in replacement 
program, was completed in 1950 replacing locks and 
dams 10 and 11. Hildebrand lock and dam, next 
upstream, was completed in 1959 replacing locks and 
dams 12 and 13. Raising crest dam 8 was also 
completed in 1959 as part of upper river improvement 
and eliminates restricted depth in upper reach of pool. 
Opekiska lock and dam, the final step in the replacement 
program, was completed in 1967 replacing 
locks and dams 14 and 15. Completion of this final link 
in upper river replacement program provides for entire 
river length of minimum channel depth of 9 feet, 
varying in width from a minimum of 250 feet to 
practically full width at mouth. Estimated cost for new 
work (1970), exclusive of amounts expended on 
previous projects is $122,500,000. (See tables 25-B, 25- 
D, and 25-E for authorizing legislation and locks and 
dams on Monongahela River, Pa. and W. Va., and 
total costs of existing project to end of fiscal year.) 
Local cooperation. None required. 
Terminal facilities. City of Pittsburgh constructed a 
modern wharf for freight. Boat landings are maintained 
by some municipalities along the river. A large 
number of tipples at mines and various types of hoists at 
manufacturing plants and sand and gravel supply 
companies are maintained for private use in loading 
and unloading coal, coke, billets, steel products, sand, 
gravel, and other commodities. These terminals and 
docks are not available for general commerce. A 
number of docks and pipelines are also privately 
maintained for petroleum and acid products. Marine 
ways are maintained by some of the larger industries. 
There are also several terminals for rail-to-river and 
river-to-rail transfer. Facilities considered adequate for 
existing commerce. 
Operations and results during fiscal year. New work: 
Major items of work performed by contract and hired 
labor: Maxwell locks and dam: Remedial work to 
water line was completed at cost of $4,424; administrative 
work in connection with settlements on 
outstanding judgments continued at cost of $2,556. 
Total cost for Maxwell locks and dam was $11,672. 
Reconstruction of dam 4: Costs incurred in connection 
with acquisition of flowage easements amounted to $8, 
729. Total cost for reconstruction of dam 4 was $12,473. 
Opekiska lock and dam: Costs incurred in connection 
with acquisition of land and flowage easements 
amounted to $1,789. Total cost for Opekiska lock and 
dam was $17,702. Operation and maintenance, general: 
Locks were operated as required and necessary 
repairs were made to structures to maintain them in a 
serviceable condition at cost of $1,482,444; maintenance 
repairs at locks and dam, including replacement 
of locomotive crane at Morgantown lock 
and dam, cost $529,460. 
Condition at end offiscalyear. Project is complete except 
for concluding acquisition of land and flowage easements 
in connection with reconstruction of dam 4 and 
the construction of Opekiska lock and dam and 
concluding administrative actions relative to outstanding 
judgments at Maxwell locks and dam project. 
A controlling depth of 9 feet is maintained for entire 
length of river, varying in width from a minimum of 
250 feet to full width of river at mouth. 
767

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
5. OPEN-CHANNEL WORK, OHIO 
RIVER. 
See this heading under Ohio River portion. 
6. TYGART LAKE, W. VA. 
Location. On Tygart River in Taylor County, W. Va., 
about 22.7 miles above mouth of river at Fairmont, W. 
Va. It is 2.25 miles upstream from Grafton, W. Va., 
and about 78 miles south of Pittsburgh, Pa. Reservoir is 
in Taylor and Barbour Counties, W. Va. (See 
Geological Survey Charts for Fairmont, Thornton, and 
Belington, W. Va.) 
Existing project. A reservoir for low water regulation 
and flood control. Dam is concrete gravity type with an 
uncontrolled center spillway flanked by_ abutment 
sections joining valley sides. Project was authorized by 
Public Works Administration January 11, 1934, and 
adopted by 1935 River and Harbor Act. For further 
project description see Annual Report for 1962. 
Completed project cost $18,431,844. 
Local cooperation. None required. 
Operations and results during fiscal year. Operation and 
maintenance, general: Reservoir was operated for 
benefit of flood control and low water regulation, as 
required, and project structures were maintained in a 
serviceable condition throughout the year at cost of 
$142,375. Melting snow beginning on December 29, 
1969 augmented by heavy rainfall on 29th and a 
mixture of rain and snow on 30th, caused a major rise 
in upper Monongahela River Basin and a minor rise in 
upper Ohio River at Pittsburgh, during which this 
reservoir achieved significant reductions. For this storm 
and flood crest stage reductions effected by this 
reservoir ranged from 6.5 feet at Maxwell locks and 
dam to 1.5 feet at Pittsburgh. Crest stage on Ohio River 
at Pittsburgh was 17.4 feet, 0.6 foot below damage 
stage. From this storm and flood reservoir reached 
elevation 1119.8, with a storage of 161,200 acre-feet or 
54 percent of usable seasonable flood control storage. 
Rainfall on April 23-25, 1970 caused a major rise in 
upper Monongahela River Basin and a minor rise in 
upper Ohio River Basin at Pittsburgh, during which 
this reservoir achieved significant reductions. For this 
storm and flood crest stage reductions effected by this 
reservoir varied from 1.5 feet at lock 2, Braddock to 1.8 
feet at Pittsburgh. Crest stage on Ohio River at 
Pittsburgh was 17.4 feet, 0.6 foot below damage stage. 
From this storm and flood the reservoir reached yearhigh 
elevation of 1122.4, with a storage of 166,900 acrefeet 
or 34 percent of usable summer flood control 
storage. Rapid melting of a 6-inch snow cover on 
January 24-26, 1970, augmented by rainfall on 29th- 
30th, caused a moderate rise in upper Monongahela 
River Basin and a minor rise in upper Ohio River at 
Pittsburgh, during which this reservoir, in conjunction 
with other reservoirs in upper Ohio River Basin, 
achieved significant reductions. For this storm and 
flood crest stage reduction effected by this reservoir at 
Pittsburgh was 0.5 foot. Crest stage on Ohio River at 
Pittsburgh was 18.5 feet, 0.5 foot above damage stage. 
From this storm and flood reservoir reached elevation 
1087.1, with a storage of 99,700 acre-feet or 32 percent 
of usable seasonal flood control storage. Rainfall on 
April 1-3, 1970, augmented by melting snow, caused a 
moderate rise in upper Monongahela River Basin and 
a minor flood in upper Ohio River at Pittsburgh, 
during which this reservoir, in conjunction with other 
reservoirs in upper Ohio River Basin, achieved 
significant reductions. For this storm and flood crest 
stage reduction effected at Pittsburgh was 0.5 foot. 
Crest stage on Ohio River at Pittsburgh was 25.6 feet, 
0.6 foot above flood stage. From this storm and flood 
reservoir reached elevation 1092.5 with a storage of 
108,700 acre-feet or 23 percent of usable seasonal flood 
control storage. Minor rises occurred on December 7- 
13, 1969, February 3-4 and March 3-7, 1970 during 
which this reservoir achieved reductions at Pittsburgh 
of 0.3, 0.05 and 0.1 foot, respectively. Crest stages on 
Ohio River at Pittsburgh for these rises were 18.0, 18.1 
and 17.0 feet, respectively. In conjunction with other 
reservoirs, during six moderate rises reservoir prevented 
overtopping of Monongahela Parking Wharf in 
Pittsburgh for a total of eight days. Estimated flood 
control benefits achieved by this reservoir for fiscal year 
were $1,624,000. Total flood control benefits for this 
reservoir through June 30, 1970 are $98,619,000. Some 
reservoir management activity was continued comprising 
sanitation measures, real estate management 
and operation and maintenance of public-use facilities. 
This work was limited in scope as State of West 
Virginia has jurisdiction over recreation in reservoir 
area. 
Condition at end of fiscal year. Authorized project is 
complete. Reservoir is in operation for low water 
control in Monongahela River and for purpose of flood 
protection in Monongahela and Ohio Valleys. Construction 
of dam was started in 1935 and placed in 
operation in 1938. 
7. YOUGHIOGHENY RIVER, PA. AND 
MD. 
Location. This river, principal tributary of Monongahela, 
rises in Preston County, W. Va., near 
western boundary of Maryland, flows northward 
through Maryland into Pennsylvania, thence northwestward 
to empty in Monongahela River at McKeesport, 
Pa. It is 123 miles long. (See Geological Survey 
Charts for southwestern Pennsylvania, western Maryland 
and northern West Virginia.) 
Previous projects. For details see Annual Report for 
1929, page 1274, and Annual Report for 1938, page 
1261. 
Existing project. Provides for channel maintenance in 
lower 1.3 miles of river from mouth to 15th Street, 
McKeesport, Pa., located within beneficial slack-water 
created by dam 2, Monongahela River. New work 
portion of project, consisting of canalization of river 
19.3 miles from mouth to West Newton, Pa., to provide 
a navigable depth of 9 feet by construction of two locks 
and dams is considered inactive. Estimated cost (1946) 
768

PITTSBURGH, PA., DISTRICT 
of this portion, is $8,785,000. Existing project was 
authorized by 1930 River and Harbor Act (Rivers and 
Harbors Committee Doc. 9, 61st Cong., 2d sess.) Project 
was modified by Chief of Engineers September 7, 1934, 
to provide for two locks and dams in lieu of three locks 
and dams previously authorized (no printed report.) 
Map of river is in House Document 82, 56th Congress, 
1st session. 
Local cooperation. None required. 
Terminal facilities. Privately maintained terminals for 
unloading coal, sand, gravel, manufactured products, 
etc., ample for present requirements, exists at McKeesport, 
Pa. 
Operations and results during fiscal year. Operation and 
maintenance, general: None. 
Condition at end of fiscal year. Effect of pool 2, 
Monongahela River, supplemented by periodic dredging, 
permits movement in lower 1.3 mile reach of river 
by commercial tows. At present channel depth of 9 feet 
exists from mouth to above mile 0.2 providing normal 
navigation requirements in this reach. Above this point 
channel is currently not maintained due to lack of 
commerce. Periodic dredging is planned for fiscal year 
1971. 
8. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See Table 25-F.) 
FLOOD CONTROL 
9. BERLIN LAKE, OHIO RIVER BASIN, 
OHIO 
Location. Dam is on Mahoning River about 73 miles 
above its confluence with Shenango River. It is about 
10 miles above existing Milton Reservoir Dam and 35 
miles upstream from Warren, Ohio. Reservoir is in 
Portage, Mahoning, and Stark Counties, Ohio (See 
Geological Survey Charts for Warren, Ravenna, and 
Alliance, Ohio.) 
Existing project. A reservoir for flood control and water 
supply. Dam consists of a partially controlled, concrete 
gravity, center spillway flanked by rolled-earthfill 
abutment sections joining valley sides. Project selected 
for construction under general authorization for Ohio 
River Basin in 1938 Flood Control Act. For further 
project description, see Annual Report for 1962, page 
1233. Federal cost of completed project was $6,288,676. 
Construction of additional recreation facilities for 
completed project is estimated to cost $2,169,800 
(1970) raising the total project cost estimate to $8,458, 
476. 
Local cooperation. None required by law. 
Operations and results during fiscal year. New work: 
Planning for construction of water supply and sewage 
system at Mill Creek recreation area continued at cost 
of $25,728. Operation and maintenance, general: 
Reservoir was operated as required and necessary 
repairs were made to structures and appurtenances at 
cost of $232,347. Melting snow beginning on January 
26, augmented by rainfall on the 28th-29th and 
February 1-3, 1970 caused a moderate rise in Mahoning 
River Basin. For this storm and flood crest stage 
reductions attributed to this reservoir at Warren on the 
29th and 3rd were 2.1 feet each. Crest stages on 
Mahoning River at Warren were 5.35 on the 29th and 
5.85 on the 3rd. Rainfall on March 3-5, 1970 caused a 
minor rise in Mahoning River Basin. For this storm 
and flood crest stage reduction attributed to this 
reservoir at Warren was 1.6 feet. Crest stage on 
Mahoning River at Warren was 6.2 feet on the 5th, 0.8 
foot below flood stage. Heavy rain on April 1-2, 1970 
caused a moderate rise in Mahoning River Basin and a 
minor flood in upper Ohio River Basin. For this storm 
and flood crest stage reductions attributed to this 
reservoir were 2.5 feet at Warren, 1.9 feet at Youngstown 
and 0.1 foot each at Montgomery, New Cumberland, 
Pike Island and lock 14, Ohio River. Crest 
stages on Mahoning River at Warren and Youngstown 
were 6.7 and 8.4 feet, respectively. From this storm and 
flood reservoir reached year-high elevation of 1027.9, 
with a storage of 70,900 acre-feet. Combined Berlin- 
Milton storage of 91,700 acre-feet represented 31 
percent of usable summer flood control storage. Heavy 
rainfall on June 26-27, 1970 caused a minor rise in 
Mahoning River Basin. For this storm and flood crest 
stage reduction attributed to this reservoir was 0.8 foot 
at Warren. Crest stage on Mahoning River at Warren 
was 6.9 feet. From this storm and flood reservoir 
reached elevation 1026.7, with a storage of 65,900 acrefeet. 
Combined Berlin-Milton storage of 88,100 acrefeet 
represented 21 percent of usable summer flood 
control storage. Estimated flood control benefits 
achieved by this reservoir for fiscal year were $539,000. 
Total flood control benefits for this reservoir through 
June 30, 1970 are $85,796,000. Regulated flows at 
Leavittsburg, Ohio, in conjunction with West Branch 
Lake, Mahoning River, for 98 days during period July- 
October 1969 and 42 days during May and June 1970 
averaged 316 cubic feet per second, representing 232 
percent of the natural low flow. Thus, this reservoir, in 
conjunction with West Branch Lake, Mahoning River, 
achieved significant benefits from low flow augmentation 
in upper Mahoning River and in conjunction 
with Mosquito Creek Lake, along the highly 
industrialized Mahoning River below Niles, Ohio. 
Water supply diversion from this reservoir by Mahoning 
Valley Sanitary District for domestic consumption 
was made under contract demands of 14.5 
million gallons per day for fiscal year. Total withdrawal 
for fiscal year was 2.582 billion gallons or 7,921 
acre-feet. Activities under reservoir management 
program comprising sanitation measures, conservation, 
land management, and operation and maintenance of 
public-use facilities were continued. 
Condition at end of fiscal year. Authorized project is 
complete and in operation for flood control and low 
water regulation purposes in industrialized Mahoning 
Valley below. Construction of dam was started 
January 1942 and completed June 1943. Land 
acquired for project consists of 6,885.3 acres in fee 
simple and easements over 1,098.42 acres. Remaining 
769

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
work consists of provision on project lands of additional 
recreation facilities required to serve public needs. 
10. BLACK FORK AT HENDRICKS, W. 
VA. 
Location. On Black Fork River at junction of Dry 
Fork and Blackwater River in Tucker County, W. Va., 
approximately 2.7 miles upstream from Parsons, W. 
Va. (See Geological Survey Chart for Parsons, W. Va.) 
Existing project. Provides for a deflection dike, 
constructed primarily of cobbles excavated from 
stream beds, approximately 2,100 feet long on right 
bank of Black Fork and right bank of Blackwater 
River. It will provide protection to town of Hendricks 
against a flood of 100-year frequency with negligible 
annual residual damages. Project was authorized for 
construction by Chief of Engineers under authority of 
section 205 of 1948 Flood Control Act as amended. 
Estimated Federal cost of new work (1970) is $50,000; 
estimated non-Federal costs of land easements is $1, 
500. 
Local cooperation. Local interests must provide lands, 
rights-of-way and spoil-disposal areas for construction; 
adjust utilities; hold United States free from damages; 
establish project limit lines and prevent encroachment 
on the area so delineated; inform affected industries, 
owners and residents at least annually of the limited 
degree of protection provided by project; and maintain 
the project works after completion in accordance with 
regulations prescribed by the Secretary of the Army. 
Town of Hendricks executed assurances of local 
cooperation and has furnished required evidence of 
legal and financial ability to fulfill assurances. Rightof-
entry for construction purposes still to be provided 
by local interests. 
Operations and results during fiscal year. New work: 
Preparation of construction plans advanced to 95 
percent completion. 
Condition at end of fiscal year. Preparation of construction 
plans is essentially complete. Local interests 
are continuing efforts to provide right-of-entry for 
construction of project. 
11. BUCKHANNON, W. VA. 
Location. On Buckhannon River, Upshur County, 
north-central West Virginia and about 100 miles south 
of Pittsburgh, Pa. (See Geological Survey Charts for 
Sago and Crawford, W. Va.) 
Existing project. Consists of major channel inprovements 
by deepening, widening, and uniformly 
aligning channel of Buckhannon River, combined with 
a channel cutoff. Project will reduce stages of floods up 
to 8,500 second-feet to no damage stage at Elias Street 
Bridge and reduce stages of all floods. Project was 
authorized by 1962 Flood Control Act. Estimated 
Federal cost for new work (1970) is $1,565,000; 
estimated non-Federal cost for lands and damages and 
utility adjustments is $75,000. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New work: 
Construction of project was essentially completed 
under contract. Flood damages prevented by project 
during 1969-1970 flood season were estimated to be 
$259,000; cumulative total flood damaged prevented 
to end of fiscal year is $259,000. 
Condition at end of fiscal year. Construction of project 
was initiated in August 1967 and essentially completed 
in September 1969. Project will be turned over to City 
of Buckhannon for operation and maintenance upon 
correction of certain flood-caused construction deficiencies. 
12. CHARTIERS CREEK, PA. 
Location. Within Washington and Allegheny Counties, 
southwestern Pennsylvania, a tributary of Ohio 
River. (See Geological Survey Chart for Carnegie, Pa.). 
Existing project. Provides for channel widening, 
deepening and realignment, construction of a major 
channel cutoff, and relocations in two separate and 
independent reaches. Carnegie-Bridgeville reach of 
improvement in Allegheny County would be about 
13.4 miles long and Canonsburg-Houston reach in 
Washington County about 4.7 miles long. Proposed 
improvements would contain within banks all floods up 
to the 1912 maximum of record, but with some residual 
damage, and would greatly reduce flood stages and 
damages resulting from higher floods. Project was 
authorized by Flood Control Act of 1965. Estimated 
cost for new work (1970) is $29,290,000, of which $22, 
500,000 is Federal cost and $6,790,000 non-Federal 
cost. 
Local cooperation. Responsible local interests must 
provide lands, easements, rights-of-way, and spoildisposal 
areas for construction; bear cost of all 
relocations and alterations of sewer, water, gas, oil, 
electric powerlines, and other utility alterations; 
railroad track shifts; highway and street modifications; 
and construction of new or reconstruction of existing 
highway bridges made necessary by construction work; 
hold United States free from damages; establish 
channel limit lines within each county along entire 
waterway downstream from existing improvements at 
Washington, Pa., and prevent any encroachment 
which would reduce flood-carrying capacity of the 
channel so defined; inform affected interests at least 
annually that project will not provide complete 
protection from floods greater in magnitude than that 
which occurred in September 1912; and maintain and 
operate project works after completion. Board of 
County Commissioners, Washington County, local 
cooperating agency for Canonsburg-Houston reach of 
improvement and Chartiers Valley District Flood 
Control Authority, local cooperating .agency for 
Carnegie-Bridgeville reach provided formal assurances 
of local cooperation which were accepted by District 
Engineer on July 12, 1967 and November 27, 1967, 
770

PITTSBURGH, PA., DISTRICT 
respectively. Tri-party contract between Allegheny 
County Sanitary Authority, Chartiers Valley District 
Flood Control Authority and United States of America 
covering relocation of sanitary sewer facilities in 
Carnegie-Bridgeville reach was approved April 4, 
1968. Local interests have completed acquisition of 
rights-of-entry and arrangements for utility adjustments 
for Units 1 and 2 of Carnegie-Bridgeville 
reach and for Unit 1 of Canonsburg-Houston reach. 
Local requirements for remaining units are expected to 
be furnished when required. Non-federal contributions 
have been made in the amount of $868,740. 
Operations and results during fiscal year. New work: 
Carnegie-Bridgeville Reach-Construction of unit 1 
was continued under contract and advanced to 87 
percent completion at cost of $949,000. Contract was 
awarded for construction of unit 2 with work progressing 
to 6 percent completion at a cost of $299,000. 
Plans for units 3 and 4 were advanced to 97 to 93 
percent completion, respectively. Total costs were $1, 
533,119. Canonsburg-Houston Reach-Construction 
of unit 1 was completed under contract at cost of $323, 
500. Progress was made in preparing plans and 
specifications for unit 2. Total costs were $431,543. 
Condition at end of fiscal year. Carnegie-Bridgeville 
Reach-Construction of unit 1 started July 1968 and is 
87 percent complete. Construction of unit 2 was started 
in April 1970 and is 6 percent complete. Construction 
plans for units 3 and 4 are 97 and 93 percent complete, 
respectively. Canonsburg-Houston 
Reach-Construction of unit 2 started in December 
1968 and was completed in March 1970. Construction 
plans for unit 2 are 65 percent complete. 
13. CONEMAUGH RIVER LAKE, OHIO 
RIVER BASIN, PA. 
Location. Dam is on Conemaugh River in Indiana 
and Westmoreland Counties, Pa., 7.5 miles above 
junction of Conemaugh River and Loyalhanna Creek, 
which form head of Kiskiminetas River. It is about 2 
miles northeast of Tunnelton, Pa., and about 42 miles 
east of Pittsburgh, Pa. Reservoir is in Westmoreland 
and Indiana Counties, Pa. (See Geological Survey 
Charts for Latrobe, New Florence, and Elders Ridge, 
Pa.) 
Existing project. A flood control reservoir dam of 
concrete gravity type with a gate-controlled center 
spillway flanked by abutment sections joining valley 
sides and an earth embankment ending in right 
abutment. Project authorized by Flood Control Acts of 
1936 and 1938. For further project description see 
Annual Report for 1962, page 1217. Completed project 
cost $45,684,411. 
Local cooperation. None required by law. 
Operations and results during fiscal year. Operation and 
maintenance, general: Reservoir was operated for 
benefit of flood control as required, and necessary 
repairs were made to structures and appurtenances at 
cost of $81,030. In addition, contracts for cleaning and 
painting crest gates of dam and for resurfacing access 
road to dam were completed at a total cost of $12,450. 
Melting snow beginning on January 26, augmented by 
rainfall on the 28th-29th and February 2-3, 1970 
caused a moderate rise in lower Allegheny Basin and a 
minor rise in Ohio River at Pittsburgh. Crest stage 
reductions attributed to this reservoir at Pittsburgh 
were 1.0 foot on January 30 and 0.55 foot on February 
3. Crest stages on Ohio River at Pittsburgh were 18.5 
feet on the 30th and 18.1 feet on the 3rd. From this 
storm and flood the reservoir reached elevation 940.4, 
with a storage of 99,500 acre-feet or 35 percent of 
usable flood control storage. Rainfall on March 2-6, 
1970 caused a minor rise in lower Allegheny Basin and 
a minor rise in Ohio River at Pittsburgh, during which 
this reservoir, in conjunction with other reservoirs in 
upper Ohio River Basin, achieved significant reductions. 
For this storm and flood crest stage reductions 
effected by this reservoir at Pittsburgh was 0.7 foot. 
Crest stage on Ohio River at Pittsburgh was 17.0 feet, 
1.0 foot below damage stage. From this storm and flood 
the reservoir reached elevation 923.0, with a storage of 
49,000 acre-feet or 17 percent of usable flood control 
storage. Heavy rain on April 2-3, 1970, augmented by 
melting snow, caused a moderate rise in lower 
Allegheny Basin and a minor flood in Ohio River at 
Pittsburgh, during which this reservoir, in conjunction 
with other reservoirs in upper Ohio River Basin, 
achieved significant reductions. For this storm and 
flood crest stage reductions effected by this reservoir at 
Vandergrift, Natrona and Pittsburgh were 8.8, 2.2, and 
1.8 feet, respectively. Conemaugh River at Vandergrift 
crested at 12.9 feet on the 3rd, 8.1 feet below damage 
stage. Ohio River at Pittsburgh crested at 25.6 feet on 
the 3rd, 0.6 foot above flood stage. From this storm and 
flood reservoir reached year-high elevation of 943.0, 
with a storage of 108,900 acre-feet or 39 percent of 
usable flood control storage. Minor rises occurred on 
December 10-13 and 26-31, 1969 and April 23-25, 
1970 during which this reservoir achieved reductions at 
Pittsburgh of 0.3, 0.1 and 0.3 foot, respectively. Crest 
stages on Ohio River at Pittsburgh for these rises were 
18.0, 17.4 and 17.4 feet, respectively. In conjunction 
with other reservoirs, during six moderate rises, the 
reservoir prevented overtopping of Monongahela 
Parking Wharf in Pittsburgh for a total of eight days. 
Estimated flood control benefits achieved by this 
reservoir for fiscal year were $5,354,000. Total flood 
control benefits for this reservoir through June 30, 1970 
are $156,578,000. Activities under reservoir management 
program comprising sanitation measures, 
conservation, land management and operation and 
maintenance of public-use facilities were continued. 
Condition at end of fiscal year. Authorized project is 
complete. Reservoir is in operation as a unit of 
coordinated reservoir system designed for protection of 
Pittsburgh and reduction of flood heights in upper 
Ohio Valley, generally. Construction of dam and 
771

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
appurtenances was started in April 1949 and completed 
in December 1952. Furnishing and erection of 2 
gantry cranes and 14 crest gates by contract were 
started in November and December 1951, and completed 
in August and September 1953, respectively. 
Relocation of main line of Conemaugh division, 
Pennsylvania Railroad, was started by contract in 
April 1946 and completed in September 1950. Land 
acquired for dams, reservoir and railroad relocation 
consists of 7,650.0 acres in fee simple and flowage 
easements over 496.2 acres. 
14. CROOKED CREEK LAKE, OHIO 
RIVER BASIN, PA. 
Location. Dam is on Crooked Creek 6.7 miles above 
junction of creek with Allegheny River near Ford City, 
Pa., and about 32 miles northeast of Pittsburgh, Pa. 
(See Geological Survey Charts for Freeport and Elders 
Ridge, Pa.) 
Existing project. A flood control reservoir dam of 
earthfill type with separate uncontrolled saddle spillway 
and tunnel outlet works. Project was authorized by 
Flood Control Acts of 1936 and 1938. For further 
project description see Annual Report for 1962, page 
1213. Completed project cost $4,204,888. 
Local cooperation. None required by law. 
Operations and results during fiscal year. Operation and 
maintenance, general: Reservoir was operated for 
benefit of flood control, as required, and necessary 
repairs were made to structures and appurtenances at 
cost of $90,354. Rainfall on January 28-29 and on 
February 2-3, 1970, augmented by melting snow, 
caused a moderate rise in middle Allegheny River 
Basin and a minor rise in Ohio River at Pittsburgh. 
Crest stage reductions attributed to this reservoir at 
Pittsburgh were 0.3 foot on January 30th and 0.1 foot 
on February 3rd. Crest stage on Ohio River at 
Pittsburgh was 18.5 feet on the 30th and 18.1 feet on 
the 3rd. From this storm and flood reservoir reached 
year-high elevation of 876.7, with a storage of 30,000 
acre-feet or 29 percent of usable flood control storage. 
Heavy rain on April 2-3, 1970, augmented by melting 
snow, caused a moderate rise in middle Allegheny 
River Basin and a minor flood in Ohio River at 
Pittsburgh, during which this reservoir, in conjunction 
with other reservoirs in upper Ohio River Basin, 
achieved significant reductions. For this storm and 
flood crest stage reductions effected by this reservoir at 
Natrona and Pittsburgh were 0.3 foot each. Crest stage 
on Ohio River at Pittsburgh was 25.6 feet, 0.6 foot 
above flood stage. From this storm and flood reservoir 
reached elevation 868.3, with a storage of 21,900 acrefeet 
or 19 percent of usable flood control storage. Minor 
rises occurred on December 10-12, 1969 and March 2- 
7, 1970, during which this reservoir achieved reductions 
at Pittsburgh of 0.1 and 0.2 foot, respectively. 
Crest stages on Ohio River at Pittsburgh for these rises 
were 18.0 and 17.0 feet, respectively. In conjunction 
with other reservoirs, during six moderate rises, the 
reservoir prevented overtopping of Monongahela 
Parking Wharf in Pittsburgh for a total of eight days. 
Estimated flood control benefits achieved by this 
reservoir for fiscal year were $974,000. Total flood 
control benefits for this reservoir through June 30, 1970 
are $49,922,000. Activities under reservoir management 
program comprising sanitation measures, 
conservation, land management, and operation and 
maintenance of certain public-use facilities continued. 
This work was limited in scope as Commonwealth of 
Pennsylvania has jurisdiction over recreation in lake 
area. 
Condition at end of fiscal year. Authorized project is 
complete. Reservoir is in operation as a unit of 
coordinated reservoir system designed for protection of 
Pittsburgh and reduction of flood heights in upper 
Ohio Valley, generally. Construction of dam was 
started in March 1938 and completed October 1940. 
Land acquisition for project consists of 2,563.57 acres 
in fee simple and easements over 98.19 acres. 
15. DUBOIS, PA. 
Location. City of DuBois is on Sandy Lick Creek, 20 
miles above its mouth at Brookville, Pa., and approximately 
80 miles northeast of Pittsburgh, Pa. (See 
Geological Survey Charts for DuBois and Penfield, 
Pa.) 
Existing project. Consists of widening, deepening and 
straightening the channel of Sandy Lick Creek for a 
distance of about 20,000 feet from Larkeytown (Falls 
Creek) Bridge to Shaffer Road Bridge, with a supplemental 
pilot channel, 4,600 feet downstream of 
Larkeytown (Falls Creek) Bridge. Improvement will 
contain a discharge of 3,800 second-feet, equal to the 
maximum flood of record. Project was authorized by 
Flood Control Act of 1965. Estimated Federal cost for 
new work (1970) is $2,240,000; estimated non-Federal 
costs of lands and damages and utility adjustments are 
$642,000. 
Local cooperation. Local interests must provide without 
cost all lands and rights-of-way for construction and 
future maintenance; hold United States free from 
damages; and at least annually notify interests affected 
that project will not provide complete flood protection. 
City of DuBois furnished informal assurances of local 
cooperation by resolution adopted May 11, 1970. By 
letter of April 9, 1968 Commonwealth of Pennsylvania 
reaffirmed its desire to participate in project. 
Operations and results during fiscal year. New work: 
Previously submitted general design memorandum was 
reanalyzed with scope of project being enlarged. 
Revised general design memorandum was completed. 
Preparation of construction plans for unit 1 was 
initiated. 
Condition at end of fiscal year. Revised general design 
memorandum is complete. Construction plans for unit 
1 are approximately 90 percent complete. 
772

PITTSBURGH, PA., DISTRICT 
16. EAST BRANCH, CLARION RIVER 
LAKE, OHIO RIVER BASIN, PA. 
Location. Dam is in Elk County, Pa., on East Branch 
of Clarion River above Middle Fork, 7.3 miles above 
junction of East and West branches of Clarion River at 
Johnsonburg, Pa., and about 105 miles northeast of 
Pittsburgh, Pa. Reservoir is in Elk County, Pa. (See 
Geological Survey Chart for Mount Jewett, Pa.) 
Existing project. A reservoir for flood control and low 
water regulation. Dam is rolled-earthfill type with 
gate-controlled concrete tunnel under right abutment 
and a paved uncontrolled spillway on left abutment 
slope. Project was selected for construction under 
general authorization for Ohio River Basin in Flood 
Control Acts of 1938 and 1944. For further project 
description see Annual Report for 1962, page 1206. 
Federal cost of completed project was $9,382,773. 
Construction of additional recreation facilities for 
completed project cost $141,828 raising total project 
cost to $9,524,601. 
Local cooperation. None required by law. 
Operations and results during fiscal year. Operation and 
maintenance, general: Reservoir was operated as 
required and necessary repairs were made to structures 
and appurtenances at cost of $97,113. In addition, 
construction of storage building was completed at cost 
of $22,600. Heavy rain on April 2-3, 1970, augmented 
by melting snow, caused a moderate rise in Clarion 
River Basin and a minor flood in upper Ohio River at 
Pittsburgh. For this storm and flood crest stage 
reductions attributed to this reservoir were 1.3 feet at 
Johnsonburg, 0.23 foot at Ridgway and 0.1 foot each at 
Kittanning, Natrona and Pittsburgh. Crest stage on 
Clarion River at Johnsonburg was 5.7 feet on April 2, 
1970. Crest stage on the Ohio River at Pittsburgh was 
25.6 feet, 0.6 foot above flood stage. On May 19, 1970 
reservoir attained highest elevation of year, 1672.1, 
with a storage of 67,800 acre-feet or 13 percent of 
usable summer flood control storage. Minor rises 
occurred on February 1-3 and April 22-24, 1970 during 
which this reservoir achieved reductions at Pittsburgh 
of 0.05 foot each. Crest stages on Ohio River at 
Pittsburgh for these rises were 18.1 and 17.4 feet, 
respectively. Estimated flood control benefits achieved 
by this reservoir for fiscal year were $313,000. Total 
flood control benefits for this reservoir through June 30, 
1970 are $4,300,000. Regulated low flow at Johnsonburg, 
Pa. for 117 days during period July-December 
1969, 10 days in January 1970 and 24 days in June 
1970 averaged 214 cubic feet per second, representing 
216 percent of natural low flow. Thus, this reservoir 
achieved significant benefits from low water augmentation. 
Some reservoir management activity was 
performed throughout the year comprising sanitation 
measures, conservation, land management and operation 
of public-use facilities. Work was limited in 
scope as bulk of reservoir lands are owned by 
Commonwealth of Pennsylvania. 
Condition at end of fiscal year. Authorized project is 
complete. Reservoir is in operation for low water 
regulation purposes in Clarion River valley below and 
for flood control as a unit of coordinated reservoir 
system for protection of Pittsburgh and upper Ohio 
Valley, generally. Construction of dam was started in 
June 1947 and completed in July 1952. Land acquired 
for project consists of 287.2 acres in fee simple and 
flowage easements over 1,290.6 acres. 
17. ELKINS, W. VA. 
Location. On Tygart River in north-central Randolph 
County, W. Va., about 155 miles south of 
Pittsburgh, Pa. It is at downstream end of a long, broad 
reach of upper Tygart Valley, about 75 miles above 
mouth of river. (See Geological Survey Chart for 
Elkins, W. Va.) 
Existing project. Provides flood protection by diverting 
flood discharges from upstream arm of loop of natural 
river channel into an artificial cutoff channel, thereby 
bypassing city of Elkins. Improvement is designed to 
accommodate discharges equivalent to maximum flood 
of reasonable expectancy. Project was authorized by 
1938 Flood Control Act. For further project description 
see Annual Report for 1962, page 1222. Federal cost of 
completed project is $1,772,627; estimated non-Federal 
costs for lands, easements, and rights-of-way is $40, 
000. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Operation and 
maintenance, general: Routine inspections were made. 
Condition at end of fiscal year. Project construction was 
commenced May 1946 and completed May 1949. 
Completed works, except that portion of channel 
maintained by Federal Government, has been operated 
and maintained by city of Elkins since March 
31, 1949. Land required for project consists of 32 acres 
in fee simple and flowage easements over 526.04 acres. 
18. JOHNSTOWN, PA. 
Location. In southwestern Cambria County, Pa., 
about 58 miles east of Pittsburgh, Pa. It is in a deep and 
comparatively narrow valley at junction of Stony 
Creek and Little Conemaugh River, which unite to 
form Conemaugh River. (See Geological Survey Chart 
for Johnstown, Pa.) 
Existing project. Increased channel capacity by enlarging 
and realining channels and protecting banks 
with concrete pavement. Improvement designed to 
accommodate discharges equivalent to those of March 
1936 flood, maximum natural flow of record, minimum 
of overbank flow and to practically eliminate damages 
therefrom. Project was authorized by Flood Control 
Acts of 1936 and 1937. For further project description 
see Annual Report for 1962, page 1215. Completed 
project cost $8,865,388. 
773

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies. 
Operations and results during fiscal year. Operation and 
maintenance, general: Routine inspections were made. 
Sealing of transverse expansion and contraction joints 
in concrete slope paving of project was completed 
under contract at cost of $26,675. Flood damages 
prevented by project during 1969-70 flood season were 
estimated to be $528,000; cumulative total flood 
damages prevented to end of fiscal year are $37, 
482.000. 
Condition at end of fiscal year. Project construction 
began in August 1938 and was completed November 
1943. Footer protection for unit 4 was completed in 
November 1949. For further details see page 1216 of 
Annual Report for 1962. Land acquired for project 
consists of flowage easements over 192 acres. 
19. KINZUA DAM AND ALLEGHENY 
RESERVOIR, OHIO RIVER BASIN, PA. 
AND N.Y. 
Location. Dam site is on Allegheny River 9 miles 
above Warren, Pa., and 198 miles above mouth of river 
at Pittsburgh, Pa. Reservoir is in Warren and McKean 
Counties, Pa., and Cattaraugus County, N.Y. (See 
Geological Survey Charts for Warren and Kinzua, 
Pa.-N.Y., and Randolph and Salamanca, N.Y.) 
Existing project. Provides for construction of a reservoir 
for flood control, low water regulation, and recreation. 
Dam consists of a combination concrete gravity 
structure and rolled earth embankment with gatecontrolled 
spillway and discharge conduits controlled 
by slide-gates in gravity section. For further details see 
Annual Report for 1962, page 1202. Project was 
authorized by Flood Control Acts of 1936, 1938, and 
1941. Estimated cost for new work (1970) is $107,855, 
000. 
Local cooperation. None required by law. 
Licenses. The Federal Power Commission granted a 
license to Pennsylvania Electric Company and Cleveland 
Electric Illuminating Company on December 28, 
1965, for the joint construction, operation and maintenance 
of a 325-megawatt pumped-storage installation 
(FPC Project No. 2280.) The project is 
complete. Power was generated from November 18, 
1969 to April 13, 1970. From July 1 to November 17, 
1969 and from April 14, 1970 to end of fiscal year no 
power was generated due to upper reservoir being 
drained to inspect leakage and make repairs. 
Operations and results during fiscal year. New work: Land 
acquisition and negotiation of settlements continued at 
cost of $738,330. Final settlements were made with 
State agencies in connection with relocation of highways 
in the amount of $271,000. Pre-award survey is 
being conducted on low bidder for construction of first 
phase of Big Bend recreation area. Operation and 
maintenance, general: Reservoir was operated for 
benefit of flood control, as required, and necessary 
repairs were made to structures and appurtenances at 
cost of $211,783. Rainfall on January 28-29 and on 
February 1-4, 1970, augmented by snowmelt, caused a 
moderate rise in upper Allegheny Basin and a minor 
rise in Ohio River at Pittsburgh during which this 
reservoir, in conjunction with other reservoirs in upper 
Ohio River Basin, achieved significant reductions. For 
this storm and flood crest stage reductions effected by 
this reservoir at Parker and at Pittsburgh were 0.6 and 
0.65 foot, respectively. Crest stage on Ohio River at 
Pittsburgh was 18.1 feet, 0.1 foot above damage stage. 
From this storm and flood reservoir reached elevation 
1310.0, with a storage of 382,200 acre-feet or 17 percent 
of usable seasonal flood control storage. Rain mixed 
with snow on April 1-3, 1970 caused a major rise in the 
upper Allegheny Basin and a minor flood in upper 
Ohio Basin at Pittsburgh during which this reservoir, 
in conjunction . ith other reservoirs in upper Ohio 
River Basin, achieved significant reductions. For this 
storm and flood crest stage reductions at Kittanning, 
Natrona and Pittsburgh, Pa. were 1.1 feet, 0.8 and 0.9 
foot, respectively. Crest stage on Ohio River at 
Pittsburgh was 25.6 feet, 0.6 foot above flood stage. 
Runoff from this storm and flood and heavy snow melt 
during April 1-14 caused reservoir to reach year-high 
elevation of 1334.3 on the 14th with a storage of 652, 
700 acre-feet or 18 percent of usable summer flood 
control storage. Minor rises occurred on December 10- 
13, 1969, January 29-February 1, March 3-6 and April 
23-25, 1970, during which this reservoir achieved 
reductions at Pittsburgh of 0.2, 0.05, 0.2 and 0.1 foot, 
respectively. Crest stages on Ohio River at Pittsburgh 
for these rises were 18.0, 18.5, 17.0 and 17.4 feet, 
respectively. In conjunction with other reservoirs, 
during six moderate rises, reservoir prevented overtopping 
of Monongahela Parking Wharf in Pittsburgh 
for a total of eight days. Estimated flood control 
benefits achieved by reservoir for fiscal year were $2, 
646,000. Total flood control benefits for this reservoir 
through June 30, 1970 are $5,443,000. Regulated low 
flow at Lock 4, Natrona, Pa. for 92 days during period 
July-November 1969 and 2 days in June 1970 averaged 
4,856 cubic feet per second, representing 128 percent of 
natural low flow. Thus, this reservoir achieved significant 
benefits from low water augmentation. Activities 
under reservoir management program comprising 
sanitation measures, conservation, land management, 
and operation and maintenance of public-use 
facilities were continued. 
Condition at end of fiscal year. Construction of project, 
initiated in February 1960, is essentially complete. 
Construction of dam was started under contract in 
September 1960 and completed in December 1965. 
Remaining major item of work, construction of Big 
Bend recreation area, has been delayed due to 
construction of power facilities by private interests in 
the general area. Of 2,132 tracts of land authorized for 
acquisition, 2,109 have been acquired. 
774

PITTSBURGH, PA., DISTRICT 
20. LOYALHANNA LAKE, OHIO RIVER 
BASIN, PA. 
Location. Dam is on Loyalhanna Creek, 4.5 miles 
above junction of creek with Conemaugh River at 
Saltsburg, Pa., and about 29 miles east of Pittsburgh, 
Pa. Reservoir is in Westmoreland County, Pa. (See 
Geological Survey Chart for Latrobe.) 
Existing project. A flood control reservoir dam of 
concrete gravity type with a gate controlled center 
spillway flanked by abutment sections joining valley 
sides, and an earth embankment section ending in left 
abutment. Project was authorized by Flood Control 
Acts of 1936 and 1938. For further project description 
see Annual Report for 1962, page 1219. Completed 
project cost $5,452,862. 
Local cooperation. None required by law. 
Operations and results during fiscal year. Operation and 
maintenance, general: Reservoir was operated for 
benefit of flood control, as required and necessary 
repairs were made to structures and appurtenances at 
cost of $108,575. Snowmelt beginning on January 26 
augmented by rainfall on 28-30 and on February 2-3, 
1970 caused a moderate rise in lower Allegheny Basin 
and a minor rise in Ohio River at Pittsburgh. Crest 
stage reductions attributed to this reservoir at Pittsburgh 
were 0.4 foot on January 30 and 0.1 foot on 
February 3. Crest stage on Ohio River at Pittsburgh 
was 18.5 feet on 30th and 18.1 feet on the 3rd. From 
this storm and flood reservoir reached year-high 
elevation of 947.3, with a storage of 30,900 acre-feet or 
31 percent of usable flood control storage. Heavy rain 
on April 2-3, 1970 augmented by melting snow, caused 
a moderate rise in lower Allegheny Basin and a minor 
flood in Ohio River at Pittsburgh, during which this 
reservoir, in conjunction with other reservoirs in upper 
Ohio River Basin, achieved significant reductions. For 
this storm and flood crest stage reductions effected by 
this reservoir at Vandergrift, Natrona, and Pittsburgh 
were 1.8 feet, 0.4 foot and 0.3 foot, respectively. The 
Conemaugh River at Vandergrift crested at 12.9 feet 
on the 3rd, 8.1 feet below damage stage. Ohio River at 
Pittsburgh crested at 25.6 feet on the 3rd, 0.6 foot above 
flood stage. From this storm and flood reservoir reached 
elevation 941.5, with a storage of 22,700 acre-feet or 22 
percent of usable flood control storage. Minor rises 
occurred on December 10-12 and 26-31, 1969, March 
2-7 and April 23-24, 1970, during which this reservoir 
achieved reductions at Pittsburgh of 0.1, 0.1, 0.2 and 
0.05 foot, respectively. Crest stages on Ohio River at 
Pittsburgh for these rises were 18.0, 17.4, 17.0 and 17.4 
feet, respectively. In conjunction with other reservoirs, 
during six moderate rises, the reservoir prevented 
overtopping of Monongahela Parking Wharf in Pittsburgh 
for a total of eight days. Estimated flood control 
benefits achieved by this reservoir for fiscal year were 
$1,024,000. Total flood control benefits for this 
reservoir through June 30, 1970 are $55,547,000. 
Activities under reservoir management program comprising 
sanitation measures, conservation, land management 
and operation and maintenance of public-use 
facilities continued. 
Condition at end of fiscal year. Authorized project is 
complete. Reservoir is in operation as a unit of 
coordinated reservoir system designed for protection of 
Pittsburgh and reduction of flood heights in upper 
Ohio Valley, generally. Construction of dam was 
started in October 1939 and completed in June 1942. 
Land acquired for project consists of 3,334.9 acres in fee 
simple and flowage easements over 86.7 acres. 
21. MAHONING CREEK LAKE, OHIO 
RIVER BASIN, PA. 
Location. Dam is on Mahoning Creek in Armstrong 
County, Pa., 21.6 miles above junction of creek with 
Allegheny River. It is about 6.50 miles southeast of 
New Bethlehem, Pa., and about 51 miles northeast of 
Pittsburgh, Pa. Reservoir is in Armstrong, Indiana, 
and Jefferson Counties, Pa. (See Geological Survey 
Charts for Rural Valley and Smicksburg, Pa.) 
Existing project. A flood control reservoir dam of 
concrete gravity type with a gate-controlled center 
spillway flanked by abutment sections joining valley 
sides. Project was authorized by Flood Control Acts of 
1936 and 1938. For further project description see 
Annual Report for 1962, page 1210. Completed project 
cost $6,421,345. 
Local cooperation. None required by law. 
Operations and results during fiscal year. Operation and 
maintenance, general: Reservoir was operated for 
benefit of flood control, as required, and necessary 
repairs were made to structures and appurtenances at 
cost of $101,697. Rainfall on January 28-29 and on 
February 2-3, 1970, augmented by melting snow, 
caused a moderate rise in middle Allegheny River 
Basin and a minor rise in upper Ohio River at 
Pittsburgh. Crest stage reductions attributed to this 
reservoir at Pittsburgh were 0.2 foot on January 30 and 
0.25 foot on February 3. Crest stage on Ohio River at 
Pittsburgh was 18.5 feet on the 30th and 18.1 feet on 
the 3rd. From this storm and flood reservoir reached 
year-high elevation 1139.5, with a storage of 36,400 
acre-feet or 46 percent of usable flood control storage. 
Heavy rain on April 2-3, 1970, augmented by melting 
snow, caused a moderate rise in middle Allegheny 
River Basin and a minor flood in upper Ohio River at 
Pittsburgh, during which this reservoir, in conjunction 
with other reservoirs in upper Ohio River Basin, 
achieved significant reductions. For this storm and 
flood crest stage reductions effected by this reservoir 
were 0.5 foot at Kittanning and 0.4 foot at Pittsburgh. 
Crest stage on Ohio River at Pittsburgh was 25.6 feet, 
0.6 foot above flood stage. From this storm and flood 
the reservoir reached elevation 1135.6, with a storage of 
31,900 acre-feet or 39 percent of usable flood control 
storage. Minor rises occurred on December 10-12, 
1969, March 3-6 and April 23-25, 1970 during which 
775

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
this reservoir achieved reductions at Pittsburgh of 0.15, 
0.2 and 0.1 foot, respectively. Crest stages on Ohio 
River at Pittsburgh for these rises were 18.0, 17.0 and 
17.4 feet, respectively. In conjunction with other 
reservoirs, during six moderate rises in reservoir 
prevented overtopping of Monongahela Parking 
Wharf in Pittsburgh for a total of eight days. Estimated 
flood control benefits achieved by this reservoir for 
fiscal year were $1,104,000. Total flood control benefits 
for this reservoir through June 30, 1970 are $55,367, 
000. Activities under reservoir management program 
comprising sanitation measures, conservation, land 
management and operation and maintenance of 
public-use facilities were continued. 
Condition at end of fiscal year. Authorized project is 
complete. Reservoir is in operation as a unit of 
coordinated reservoir system designed for protection of 
Pittsburgh and reduction of flood heights in upper 
Ohio Valley, generally. Construction of dam was 
started in February 1939 and completed in June 1941. 
Land acquired for project consists of 2,532.6 acres in fee 
simple and flowage easements over 83.5 acres. 
22. MOSQUITO CREEK LAKE, OHIO 
RIVER BASIN, OHIO 
Location. Dam is on Mosquito Creek, 9 miles above 
junction of creek with Mahoning River at Niles, Ohio, 
and about 18 miles northwest of Youngstown, Ohio. 
(See Geological Survey Charts for Bristolville and 
Kinsman, Ohio, and Pennsylvania.) 
Existing project. A reservoir for flood control, low 
water regulation and water supply storage. Dam is 
rolled-earthfill type with outlet facilities through dam, 
and an uncontrolled natural wasteway to discharge 
overflow from reservoir. Project was selected for 
construction under general authorization for Ohio 
River Basin in 1938 Flood Control Act. For further 
project description see Annual Report for 1962, page 
1228. Completed project cost $4,035,400. 
Local cooperation. None required by law. 
Operations and results during fiscal year. Operation and 
maintenance, general: Reservoir was operated for 
benefit of flood control and low flow regulation as 
required, and necessary repairs were made to structures 
and appurtenances at cost of $88,119. In addition, 
resurfacing of parking area at dam was completed 
under contract at cost of $4,000. Heavy rain on April 1- 
2, 1970 caused a moderate rise in Mahoning River 
Basin and a minor flood in upper Ohio River Basin. 
For this storm and flood crest stage reduction attributed 
to this reservoir was 0.3 foot at Youngstown. 
Crest stage on Mahoning River at Youngstown was 8.4 
feet. From this storm and flood reservoir reached yearhigh 
elevation of 902.0, with a storage of 86,800 acrefeet 
or 20 percent of usable summer flood control 
storage. Estimated flood control benefits achieved by 
this reservoir for fiscal year were $47,000. Total flood 
control benefits for this reservoir throughJune 30, 1970 
are $16,762,000. Regulated flows at Youngstown, Ohio 
for 103 days during period July-October 1969 and 34 
days during May and June 1970 averaged 435 cubic 
feet per second, representing 184 percent of natural low 
flow. Thus, this reservoir in conjunction with West 
Branch Mahoning and Berlin Lakes, achieved significant 
benefits from low flow augmentation along 
highly industrialized Mahoning River below Niles, 
Ohio. This is 16th complete year in which City of 
Warren, Ohio, diverted their water supply from 
Mosquito Creek Lake. Water withdrawal was 5.402 
billion gallons or 16,569 acre-feet. Activities under 
reservoir management program comprising sanitation 
measures, conservation, land management, and operation 
and maintenance of certain public-use facilities 
continued. This work was limited in scope as State of 
Ohio has jurisdiction over recreation in reservoir area. 
Condition at end of fiscal year. Authorized project is 
complete and in operation for flood control and low 
water regulation purposes in industrialized Mahoning 
and Beaver Valleys below. Construction of dam was 
started in July 1943 and was ready for beneficial use 
January 1944. Land acquired for project consists of 11, 
180.6 acres in fee simple and flowage easements over 
276.1 acres. State of Ohio has a license from Secretary 
of the Army for development and operation of 
recreation facilities in reservoir area. 
23. MUDDY CREEK DAM, PA. 
Location. In Crawford County, northwestern Pennsylvania, 
on Muddy Creek, a tributary of French 
Creek. Damsite is about 9 miles above mouth of 
Muddy Creek and about 15 miles northeast of 
Meadville, Pa. (See Geological Survey Chart for Union 
City, Pa. - N. Y.) 
Existing project. Provides for construction of flood 
control reservoir dam of rolled earth embankment nongated 
type with uncontrolled side-hill type spillway. 
The uncontrolled lower outlet works will consist of a 
cut and cover conduit in the valley floor with invert at 
elevation 1160 m.s.l. The upper outlet works will be 
built at the right abutment to accommodate an invert 
elevation 1188 m.s.l. Dam will be 6,900 feet long at top 
rising 64 feet above streambed and provide for gross 
capacity of 19,400 acre-feet from a drainage area of 
61.5 square miles. The project will be operated as one 
of three-reservoir system for reduction of flood stages in 
French Creek Basin between damsite and mouth, 
Allegheny River from Franklin, Pa., to Pittsburgh, Pa., 
inclusive, and upper Ohio River Valley. Existing 
project was authorized by 1962 Flood Control act. 
Estimated Federal cost for new work (1970) is $14,600, 
000. 
Local cooperation. Local interests must inform affected 
interests in French Creek Basin at least annually, in a 
manner satisfactory to District Engineer, that system of 
reservoirs of which Muddy Creek Dam is a part, will 
not provide protection against maximum floods. 
776

PITTSBURGH, PA., DISTRICT 
Pennsylvania Department of Forests and Waters has 
assumed responsibility of local cooperation for project. 
Operations and results during fiscal year. New work: 
Preconstruction planning was resumed. 
Condition at end of fiscal year. Construction not started. 
General design memorandum is complete. Supplement 
to general design memorandum covering conservation 
pool study is 25 percent complete. Highway relocations 
and real estate design memoranda are 95 and 25 
percent complete, respectively. 
24. OHIO RIVER BASIN (PITTSBURGH 
DIST.) 
Location. Levees, floodwalls, channel improvements, 
and reservoir lakes in Ohio River Basin within 
Pittsburgh District. 
Existing project. Individual projects considered in 
comprehensive plan within Pittsburgh District. (See 
tables 25-B, 25-G and 25-H on Acts authorizing 
existing projects, local protection projects and reservoirs.) 
Operations and results during fiscal year. New work: 
Restudy report for Bellaire, Ohio local flood protection 
project was initiated to determine extent of damages, 
feasibility of flood protection works and attitude of 
local interests towards providing local cooperation 
requirements. Completed local protection projects 
operated and maintained by local interests, other than 
those projects for which individual reports have been 
included, prevented flood damages of an estimated 
$720,800 during fiscal year. 
Condition at end of fiscal year. Phase I of restudy report 
for Bellaire, Ohio local flood protection project is 12 
percent complete. Preliminary surveys and plans are 
complete for a number of projects included in 
comprehensive plan. Status of projects selected for 
construction under this authorization is given in 
individual reports. 
25. PUNXSUTAWNEY, OHIO RIVER 
BASIN, PA. 
Location. Borough of Punxsutawney is on Mahoning 
Creek in Jefferson County, Pa., about 85 miles 
northeast of Pittsburgh, Pa. It is on a comparatively 
wide, alluvial flood plain about 52 miles above mouth 
of stream and 30 miles above Mahoning Creek flood 
control dam. (See Geological Survey Charts for 
Punxsutawney and Smicksburg, Pa.) 
Existing project. Provides flood protection by channel 
enlargement, dikes, and walls. Improvement is designed 
to accommodate discharges 20 percent greater 
than that of maximum flood record. Project was 
authorized by 1938 Flood Control Act. For further 
project description see Annual Report for 1962, page 
1209. Federal cost of completed project is $3,586,107. 
Non-Federal cost was $180,485. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Operation and 
maintenance, general: Operation activities and routine 
inspections and reports were made. In addition, 
periodic removal of sand and gravel deposits was 
completed under contract at a cost of $18,520. Flood 
damages prevented by project during 1969-70 flood 
season were estimated to be $44,000; cumulative total 
flood damages prevented to end of fiscal year are $3, 
406,000. 
Condition at end of fiscal year. Construction was 
accomplished by four construction units. Construction 
was started May 1946 and completed June 1950. Land 
required for project consists of perpetual easements 
over 72.6 acres. Completed works, except that portion 
of channel maintained by the Federal Government, 
have been operated and maintained by borough of 
Punxsutawney since July 31, 1950. 
26. RIDGWAY AND VICINITY, PA. 
Location. On Clarion River in and adjacent to 
Borough of Ridgway, Elk County, Pa., approximately 
95 miles northeast of Pittsburgh, Pa. (See Geological 
Survey Chart for Ridgway, Pa.) 
Existing project. Provides for widening, deepening and 
realignment of existing channel beginning immediately 
upstream of mouth of Elk Creek and 
continuing downstream for approximately 8,500 feet. 
Project was authorized for construction by Chief of 
Engineers under authority of section 205 of the 1948 
Flood Control Act as amended. Estimated Federal cost 
of new work (1970) is $1,000,000; estimated non- 
Federal cost of lands, utility relocations and construction 
adjustments is $339,000. 
Local cooperation. Responsible local interests must 
provide without cost all lands, easements, rights-of-way 
and spoil disposal areas necessary for construction of 
project; bear cost of adjustments to utilities; hold and 
save United States free from damages due to construction 
work and maintenance of project; establish 
channel limit lines and prevent encroachment on the 
channel so delineated; at least annually, notify 
interests affected that improvement will not provide 
complete protection from floods greater than design 
conditions; and maintain project works after completion. 
By resolution passed September 14, 1967, 
Borough of Ridgway signified its intention to provide 
required assurances of local cooperation when request 
is made therefor. In letter of April 11, 1968 the 
Borough expressed willingness to withstand Federal 
costs of the project exceeding the $1,000,000 limitation. 
Operations and results during fiscal year. New work: 
Preparation of construction plans continued. 
Condition at end of fiscal year. Preparation of construction 
plans are approximately 20 percent complete. 
777

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
27. ROWLESBURG LAKE, W. VA. 
Location. In Preston and Tucker Counties, north 
central West Virginia on Cheat River, a tributary of 
Monongahela River. Dam site is at upstream limits of 
town of Rowlesburg, W. Va. (See Geological Survey 
Chart for Kingwood, W. Va.) 
Existing project. Provides for construction of flood 
control reservoir dam of concrete gravity type with 
controlled outlets works and spillway 1,695 feet in 
length and 271 feet high above streambed. Reservoir 
surface at full level would be 9,140 acres. Gross 
controlled reservoir storage would amount to 831,700 
acre-feet from a tributary drainage area of 936 square 
miles. Authorized project purposes are flood control, 
water quality control, recreation, and hydroelectric 
power production. About 299,600 acre-feet of storage 
would be available for flood control during winter 
months and 250,800 acre-feet during the summer. 
Storage for control of water quality, production of 
hydroelectric power, and other uses of 571,500 acre-feet 
would, for the most part, serve several purposes 
simultaneously. Existing project was authorized by 
1965 Flood Control Act. Estimated Federal cost for 
new work (1970) is $134,000,000, exclusive of power 
facilities. 
Local cooperation. Local interests are required to 
reimburse the Federal Government for the costs 
allocated to water quality control (cooling) presently 
estimated at $2,915,000, exclusive of interest. Also, in 
accordance with P.L. 89-72, Federal Water Project 
Recreation Act, local interests are required to bear onehalf 
of the separable costs allocated to recreation and 
fish and wildlife enhancement, presently estimated at 
$1,745,000, exclusive of interest, and bear all cost of 
operation, maintenance and replacement, at an 
estimated cost of $288,000 annually. In addition, local 
interests are required to provide assurances that they 
will hold and save the United States free from claims 
for damages from storage of water and provide 
adequate direct waste treatment at the source within a 
reasonable period of time and preserve existing and 
augmented low flows for the intended water quality 
purposes. State of West Virginia, by letter of January 4, 
1968, assumed these latter obligations and by letter 
dated April 10, 1970 declined participation in the 
recreation program under P.L. 89-72. 
Operations and results during fiscal year. New work: 
Engineering studies were continued. 
Condition at end of fiscal year. Revisions to general 
design memorandum are nearing completion. Preparation 
of plans and specifications for relocation of 
western section of U.S. Route 50 is 98 percent 
complete. Real estate design memorandum covering 
land required for relocation of U.S. Route 50 and State 
Route 72 and for the dam site is 80 percent complete. 
28. SALAMANCA, N. Y. 
Location. City of Salamanca is in Cattaraugus 
County, southwestern New York, on both banks of 
Allegheny River about 10 miles upstream from New 
York-Pennsylvania State line and about 222 miles 
above mouth of river at Pittsburgh, Pa. (See Geological 
Survey Charts for Randolph and Salamanca, N.Y.) 
Existing project. Provides for flood protection by means 
of dikes and floodwalls. Earth dikes will be used along 
riverbanks where space permits. Where buildings and 
other structures limit available space, floodwalls of a 
suitable type will be used. Structures for relief of 
internal drainage will be provided as required. 
Improvement will protect community from flood 8 
percent greater than maximum of record, with 3 feet of 
freeboard. Project was authorized by 1962 Flood 
Control Act. Estimated Federal cost for new work 
(1970) is $2,930,000; estimated non-Federal cost of 
lands, damages, and relocations is $465,000. 
Local cooperation. Responsible local interests must 
provide lands and rights-of-way for construction; hold 
United States free from damages; accomplish changes, 
relocations, and alterations of buildings, utilities, and 
structures made necessary by the work; prevent 
encroachment of levees, floodwalls, and flood-carrying 
capacity of improved waterway; and maintain and 
operate all works after completion in accordance with 
regulations. New York State Department of Transportation 
is the local cooperation agency for flood 
control improvements. Assurances of local cooperation 
were accepted by District Engineer September 20, 
1965. Right-of-entry for construction purposes was 
granted Government for the three units comprising 
project. 
Operations and results during fiscal year. New work: 
Construction of units 1 and 3 continued under contract 
and was advanced to 90 percent completion at cost of 
$579,700. Construction of unit 2 was started in 
December 1969 and is 22 percent complete with fiscal 
year costs amounting to $209,200. 
Condition at end of fiscal year. Construction of project, 
involving levees, floodwalls and pumping plants, was 
initiated in September 1968 and is about 65 percent 
complete. 
29. SHENANGO RIVER LAKE, OHIO 
RIVER BASIN, PA. AND OHIO 
Location. Dam is on Shenango River about 0.8 mile 
above Sharpsville, Pa., and about 33 miles above 
junction of river with Mahoning River, which unite 
near New Castle, Pa., to form Beaver River. Reservoir 
is in Mercer County, Pa., and Trumbull County, Ohio. 
(See Geological Survey Chart for Kinsman, Ohio, and 
Shenango, Pa.) 
Existing project. A reservoir for flood control, low-flow 
augmentation, and recreation. Dam consists of a 
concrete gravity structure with gate-controlled outlet 
778

PITTSBURGH, PA., DISTRICT 
works and an uncontrolled center spillway section. For 
further project description, see Annual Report for 
1962, page 1230. Project was authorized by 1938 Flood 
Control Act. Estimated cost for new work (1970) is $39, 
535,000 which includes $2,635,000 for future recreation 
facilities. 
Local cooperation. None required by law. 
Operations and results during fiscal year. New work: 
Acquisition of land and payment of damages continued 
at cost of $256,800; final payments on completed 
highway relocation contracts amounted to $262,200. 
Operation and maintenance, general: Reservoir was 
operated for benefit of flood control, as required, and 
necessary repairs were made to structures and appurtenances 
at cost of $167,559. Heavy rain on April 1- 
2, 1970 caused a moderate rise in Shenango River 
Basin and a minor flood in upper Ohio River Basin. 
For this storm and flood crest stage reductions 
attributed to this reservoir at Montgomery and Pike 
Island locks were 0.1 foot each. From this storm and 
flood the reservoir reached year-high elevation of 
899.2, with a storage of 52,900 acre-feet or 8 percent of 
usable summer flood control storage. Melting snow 
beginning on January 26, augmented by rainfall on the 
28th-29th and February 2-3, 1970, caused a moderate 
rise in Shenango River Basin. From this storm and 
flood the reservoir reached elevation 899.0, with a 
storage of 52,100 acre-feet or 23 percent of usable 
seasonal flood control storage. However, no benefits 
were attributed to the reservoir on this rise since 
damage stages downstream would not have been 
reached under natural conditions. Estimated flood 
control benefits achieved by this reservoir for fiscal year 
were $161,000. Total flood control benefits for this 
reservoir through June 30, 1970 are $1,890,000. 
Regulated flows at Sharon, Pa., for 35 days during July 
and August 1969 and 10 days in June 1970 averaged 
266 cubic feet per second, representing 163 percent of 
natural low flow. Thus, this reservoir achieved benefits 
from low water augmentation. Activities under reservoir 
management program comprising sanitation 
measures, conservation, land management, and operation 
and maintenance of public-use facilities were 
continued. 
Condition at end of fiscal year. Authorized project is 
essentially complete. Reservoir is in operation for low 
water regulation purposes in Shenango River valley 
below and for flood control as a unit of a coordinated 
reservoir system for protection of Shenango River 
valley and the Beaver and upper Ohio River valley, 
generally. Construction of dam was started in March 
1963 and completed in May 1965. Of 1,021 tracts of 
land authorized for acquisition 1,013 have been 
acquired. 
30. STONEWALL JACKSON LAKE, W. VA. 
Location. In Lewis County, northern West Virginia, 
on the West Fork River, which joins the Tygart River 
at Fairmont, West Virginia to form the Monongahela 
River. Damsite is located at Brownsville, West Virginia, 
about 4 miles south of Weston and 72 miles 
above mouth of West Fork River at Fairmont, W. Va. 
(See Geological Survey Charts for Weston and Crawford, 
W. Va.) 
Existing project. Provides for construction of a reservoir 
for flood control, water supply, water quality control, 
area redevelopment and recreation. Dam would be of 
the concrete gravity type, 95 feet high and 680 feet 
long. Outlet works will consist of four multi-level 
sluices, spillway will be uncontrolled. Storage capacity 
will be 75,200 acre-feet controlling an area of 102 
square miles. Project was authorized by 1966 Flood 
Control Act. Estimated initial Federal cost for new 
work (1970) is $49,800,000 (includes $3,010,000 
reimbursement by non-Federal interests). 
Local cooperation. Local interests are required to make 
arrangements for repayment, under provisions of the 
Water Supply Act of 1958, as amended, of that part of 
the construction cost and annual operation, maintenance 
and replacement costs allocated to municipal 
and industrial water supply, an amount presently 
estimated at $1,870,000 for construction; and $3,800 
annually for operation, maintenance and replacements. 
Also, in accordance with the Federal 
Water Project Recreation Act, local interests are 
required to administer project land and water areas for 
recreation and fish and wildlife enhancement, pay, 
contribute in kind or repay (which may be through 
user fees) with interest, one-half of the separable first 
cost of the reservoir project allocated to recreation and 
fish and wildlife enhancement, an amount presently 
estimated at $1,140,000; bear all costs of operation, 
maintenance and replacement of recreation and fish 
and wildlife lands and facilities, the amount involved 
being currently estimated on an average annual basis 
to be $95,700; hold and save the United States free 
from damages resulting from water-rights claims due to 
construction and operation of the project; exercise to 
the full extent of their legal capability, control against 
removal of streamflow made available for water 
quality control; and contribute to the control of 
pollution of streams subject to low-flow augmentation 
by adequate treatment or other methods of controlling 
wastes at their source. The City of Weston desires 
inclusion of storage for present and future use for water 
supply purposes. The City also recognizes the responsibility 
of repayment to the United States of all 
costs allocated to its share of the total storage allocated 
to water supply and on April 6, 1970 adopted a 
resolution expressing willingness to pay its portion of 
costs allocated to water supply. Clarksburg interests 
recognize the need for assuring an adequate future 
supply of raw water for their area. Because of conflicts 
in determining the responsible parties or agencies to 
assume the responsibility of repayment to the United 
States of their share of costs allocated to water supply, 
no resolution has been received to date to allow this 
779

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
storage to be included in the impending General 
Design Memorandum. The local water supply agency, 
Clarksburg Water Board, although supporting in 
general the project as proposed, does not for several 
reasons (riparian use of water quality flows, current 
indebtedness, widespread use and benefits) accept the 
conditions for repayment of allocated costs outlined in 
the Water Supply Act of 1958, as amended. Recent 
proposals by the Clarksburg City Council and Harrison 
County Commissioners to assume two-thirds of 
these costs conditional on Water Board participation 
has also failed to dislodge the Water Board from its 
position. Should an acceptable assurance not be 
forthcoming in the very near future, the amount of 
storage reserved to the Clarksburg area will be 
reallocated to other project purposes. The State of West 
Virginia on July 1, 1969 furnished a letter of intent that 
it desires to participate in the recreational development 
of the project in accordance with the provisions of the 
Federal Water Project Recreation Act of 1965. The 
State on November 3, 1965 provided assurances that it 
will hold and save the United States free from any 
claims for damage which may be made or asserted as 
the result of the storage of waters for water quality 
control purposes; exercise, to the full extent of its legal 
capability, control against removal of streamflow made 
available for water quality control; and contribute to 
the control of pollution of streams subject to low-flow 
augmentation by fully enforcing its laws which require 
adequate treatment or other methods of controlling 
wastes at their sources. Up-to-date assurances are 
presently being drafted by the current administration 
in Charleston. 
Operations and results during fiscal year. New work: 
Preconstruction engineering and design studies continued. 
Preparation of general design memorandum 
and design memorandum covering relocation of gas 
compressor station continued. Design memorandum 
covering all lands necessary for dam construction, 
reservoir purposes, and public access and use areas was 
submitted for approval. 
Condition at end of fiscal year. General design memorandum, 
which includes study for relocation of section 
of West Virginia Route 30 is 90 percent complete. 
Design memorandum covering relocation of gas 
compressor station is 99 percent complete. 
31. TENMILE CREEK AT MARIANNA, PA. 
Location. On Tenmile Creek in and near Marianna 
and vicinity, Washington County, Pa., and about 13 
miles southeast of the City of Washington, Pa. (See 
Geological Survey Chart for Amity, Pa.) 
Existing project. Flood protection along Tenmile 
Creek in villages of East Marianna and West Zollarsville 
by channel widening, deepening and minor 
realignment for a distance of 7,761 feet with the lower 
end of improvement beginning 5,035 feet downstream 
of existing Jefferson Avenue highway bridge which 
connects the villages of East Marianna and West 
Zollarsville, Pa. Improvement is designed to eliminate 
damages from floods up to the magnitude of that of 
March 1963 with slight residual damage. Project was 
authorized for construction by Chief of Engineers 
under authority of section 205, 1948 Flood Control Act, 
as amended. Estimated Federal cost for new work 
(1970) is $795,000; estimated non-Federal cost of lands, 
damages and relocations is $48,000. 
Local cooperation. Local interests must provide lands, 
rights-of-way and spoil disposal areas for construction; 
adjust utilities; hold United States free from damages; 
establish channel limit lines and prevent encroachment 
in channel so delineated; and maintain project works 
after completion in accordance with regulations 
prescribed by Secretary of the Army. Formal assurances 
of local cooperation provided by Bethlehem 
Township, the local cooperating agency, were accepted 
by District Engineer on 24 May 1968. Financial and 
legal ability of township to fulfill the assurances has 
been provided. Local interests are continuing efforts to 
secure right-of-entry for construction purposes. 
Operations and results during fiscal year. New work: 
Limited preconstruction planning continued. 
Condition at end of fiscal year. Plans and specifications 
are complete. Construction not started. Local interests 
are continuing efforts to secure right-of-entry for 
construction purposes. 
32. TIONESTA LAKE, OHIO RIVER 
BASIN, PA. 
Location. Dam is on Tionesta Creek, 1.25 miles above 
junction of creek with Allegheny River at Tionesta, 
Pa., and about 78 miles northeast of Pittsburgh, Pa. 
Reservoir is entirely in Forest County, Pa. (See 
Geological Survey Charts for Tionesta, Tidioute and 
Sheffield, Pa.) 
Existing project. A flood control reservoir dam of 
earthfill type with separate uncontrolled saddle spillway 
and tunnel outlet works. Project was authorized by 
Flood Control Acts of 1936 and 1938. For further 
project description see Annual Report for 1962, page 
1203. Federal cost of completed project was $5,213,401. 
Construction of additional recreation facilities for 
completed project is estimated to cost $2,546,500 
(1970), of which $290,000 is to be contributed by non- 
Federal interests, raising total project cost estimate to 
$7,759,901. 
Local cooperation. None required by law. 
Operations and results during fiscal year. New work: 
Planning continued for additional facilities to be 
constructed at Tionesta and Nebraska recreation areas. 
Operation and maintenance, general: Reservoir was 
operated for benefit of flood control, as required, and 
necessary repairs were made to structures and appurtenances 
at cost of $156,380. In addition, a storage 
building was erected at cost of $27,680. Rainfall on 
January 28-29 and on February 1-4, 1970, augmented 
780

PITTSBURGH, PA., DISTRICT 
by snowmelt, caused a moderate rise in upper 
Allegheny Basin and a minor rise in Ohio River at 
Pittsburgh during which this reservoir, in conjunction 
with other reservoirs in upper Ohio River Basin 
achieved significant reductions. For this storm and 
flood crest stage reductions effected by this reservoir at 
Parker and at Pittsburgh were 0.2 and 0.25 foot, 
respectively. Crest stage on Ohio River at Pittsburgh 
was 18.1 feet, 0.1 foot above damage stage. From this 
storm and flood reservoir reached elevation 1117.5, 
with a storage of 34,000 acre-feet or 21 percent of 
usable flood control storage. Rain mixed with snow on 
April 1-3, 1970 caused a moderate rise in upper 
Allegheny Basin and a minor flood in upper .Ohio 
River at Pittsburgh, during which this reservoir, in 
conjunction with other reservoirs in upper Ohio River 
Basin, achieved significant reductions. For this storm 
and flood crest stage reductions effected by this 
reservoir at Lock 7, Kittanning, Lock 4, Natrona and 
at Pittsburgh were 0.8, 0.9, and 0.7 foot, respectively. 
Crest stage on Ohio River at Pittsburgh was 25.6 feet, 
0.6 foot above flood stage. From this storm and flood 
reservoir reached year-high elevation of 1126.8, with a 
storage of 45,600 acre-feet or 30 percent of usable flood 
control storage. Minor rises occurred on December 10- 
13, 1969, January 29-February 1, March 3-6 and April 
23-25, 1970, during which this reservoir achieved 
reductions at Pittsburgh of 0.2, 0.05, 0.1 and 0.05 foot, 
respectively. Crest stages on Ohio River at Pittsburgh 
for these rises were 18.0, 18.5, 17.0 and 17.4 feet, 
respectively. In conjunction with other reservoirs, 
during six moderate rises the reservoir prevented 
overtopping of Monongahela Parking Wharf in Pittsburgh 
for a total of eight days. Estimated flood control 
benefits achieved by the reservoir for fiscal year were 
$1,966,000. Total flood control benefits for this 
reservoir through June 30, 1970 are $69,215,000. 
Activities under reservoir management program comprising 
sanitation measures, conservation, land management, 
and operation and maintenance of public-use 
facilities continued. 
Condition at end of fiscal year. Authorized project is 
complete. Reservoir is in operation as a unit of 
coordinated reservoir system designed for protection of 
Pittsburgh and reduction of flood heights in upper 
Ohio Valley, generally. Construction of dam was 
started in May 1938 and completed in January 1941. 
Land required for project consists of 2,797.3 acres in fee 
simple and flowage easements over 13.1 acres. Future 
work consists of provision on project lands of additional 
recreational facilities as required to serve public needs. 
33. TURTLE CREEK, PA. 
Location. In Allegheny and Westmoreland Counties, 
adjacent to Pittsburgh, Pa., along lower reaches of 
Turtle Creek and Thompson Run, a tributary of 
Turtle Creek. (See Geological Survey Chart for 
Pittsburgh, Pa.) 
451-584 0-72-50 
Existing project. Provides for flood protection by 
widening, deepening, and streamlining channel of 
lower Turtle Creek for about 6.3 miles and channel of 
Thompson Run for about 1 mile above its mouth. 
Appurtenant work consists of channel streambed and 
side slope protection where required, retaining walls, 
drop structures, debris basins, lowering sill of existing 
backwater floodgates, alteration, removal or reconstruction 
of restrictive structures and adjustments of 
affected utilities. Improvement is designed to accommodate 
a design flood corresponding to an 
estimated 100 year frequency. Project was authorized 
by Flood Control Act of 1958. Estimated Federal cost 
for new work (1970) is $15,370,000; estimated non- 
Federal cost is $1,840,000. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New work: 
Construction of concrete cap wall in Unit 2 and 
remedial channel dredging in lower portion of project 
were completed under contract at total cost of $302, 
400. Plans are being prepared for construction of debris 
basins. Flood damages prevented by project during 
fiscal year were estimated to be $1,351,000; cumulative 
total through June 30, 1970 is $1,917,000. 
Condition at end of fiscal year. Construction of project, 
initiated in September 1962 was essentially completed 
in November 1967. Remaining work consists of 
construction of debris basins. On June 5, 1970 the 
entire project was unqualifiedly turned over to Turtle 
Creek District Flood Control Authority for operation 
and maintenance. 
34. UNION CITY DAM, PA. 
Location. In Erie County, northwestern Pennsylvania, 
on French Creek, a tributary of Allegheny River. 
Damsite is 24 miles upstream from Cambridge Springs, 
Pa., and 41 miles upstream from Meadville, Pa. (See 
Geological Survey Chart for Union City, Pa.-N.Y.) 
Existing project. Provides for construction of flood 
control reservoir dam of earth embankment nongated 
type with uncontrolled side-channel spillway. Outlet 
works will consist of a lower outlet located in valley 
floor constructed of reinforced concrete conduit 8 feet 
by 4.5 feet and an upper outlet consisting of an 
uncontrolled slot 9.5 feet wide through the north end of 
the ogee weir in the spillway. Dam will be 1,420 feet 
long at top rising 88 feet above streambed and provide 
gross capacity of 47,640 acre-feet from a drainage area 
of 222 square miles. Reservoir will be operated as one of 
three-reservoir system for reduction of flood stages in 
French Creek Basin between damsite and mouth, 
Allegheny River from Franklin, Pa., to Pittsburgh, Pa., 
inclusive, and upper Ohio River Valley. Existing 
project was authorized by 1962 Flood Control Act. 
Estimated Federal cost for new work (1970) is $13,700, 
000. 
Local cooperation. Local interests must inform affected 
interests in French Creek Basin at least annually, in a 
31

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
manner satisfactory to District Engineer, that the 
system of reservoirs of which Union City Dam is a part, 
will not provide protection against maximum floods. 
Commonwealth of Pennsylvania acting by and 
through the Water and Power Resources Board of 
Department of Forests and Waters executed assurances 
November 10, 1964, that it is willing to commit itself 
formally to performance of required notification, and 
has legal ability to make such commitment. 
Operations and results during fiscal year. New work: 
Engineering and design studies continued. Construction 
of dam was continued and advanced to 65 
percent completion at cost of $1,586,300. Contract was 
awarded for construction of remaining highways with 
work being advanced to 19 percent completion at cost 
of $590,150. Sixty-two tracts of land were acquired. 
Condition at end of fiscal year. Construction of project 
was initiated in December 1966 with overall project 
being approximately 59 percent complete. Initial 
highway relocations were completed in October 1968 
and remaining highway relocations are 19 percent 
complete. Construction of dam is 65 percent complete. 
All 246 tracts of land authorized for acquisition have 
been acquired. 
35. WEST BRANCH LAKE, MAHONING 
RIVER, OHIO 
Location. Dam site is on West Branch of Mahoning 
River which joins Mahoning River at Newton Falls, 
Ohio. It is 11 miles above mouth of branch and about 
15 miles upstream from Warren, Ohio. Reservoir is in 
Portage County, Ohio (See Geological Survey Charts 
for Ravenna, Garrettsville, Chagrin Falls, and Kent, 
Ohio.) 
Existing project. Provides for construction of a reservoir 
for flood control, low-water regulation, and recreation. 
Dam consists of a rolled-earth embankment structure 
with gate-controlled outlet works and an uncontrolled 
side-hill spillway through left abutment. For further 
description see Annual Report for 1962, page 1231. 
Project was authorized by 1958 Flood Control Act (H. 
Doc. 191, 85th Cong., 1st sess.), with local contribution 
requirements modified by Flood Control Act of 1960. 
Estimated ultimate Federal cost for new work (1970) is 
$15,930,000 which includes $530,000 estimated cost of 
additional recreation facilities. 
Local cooperation. Local interests must contribute $5, 
200,000 for water for pollution abatement and for 
municipal and industrial water supply purposes, of 
which $3,230,000 was paid in cash during construction. 
Unpaid balance at time project is placed in operation, 
$1,970,000, will be paid in cash at that time or on an 
annual basis. Of the unpaid balance of contributed 
funds due and payable, payment in full of Trumbull 
County's share in the amount of $663,040 has been 
received. Mahoning County elected to pay their share 
($1,306,960) in annual installments of $50,323.32 and 
has paid $100,646.64 to date. Local interests have now 
contributed $3,993,686.64 towards total of $5,200,000 
non-Federal cost. 
Operations and results during fiscal year. New work: 
Settlements in connection with land acquisition amounted 
to $64,800. Operation and maintenance, 
general: Reservoir was operated for benefit of flood 
control and low flow augmentation as required and 
necessary repairs were made to structures and appurtenances 
at cost of $127,903. Melting snow beginning 
on January 26, augmented by rainfall on the 
28th-29th and on February 1-3, 1970, caused a 
moderate rise in Mahoning River Basin. For this storm 
and flood crest stage reductions attributed to this 
reservoir at Warren were 1.0 foot on the 29th and 0.8 
foot on the 3rd. Crest stages on the Mahoning River at 
Warren were 5.35 on the 29th and 5.85 on the 3rd. 
Rainfall on March 3-5, 1970 caused a minor rise in 
Mahoning River Basin. For this storm and flood crest 
stage reduction attributed to this reservoir at Warren 
was 0.94 foot. Crest stage on Mahoning River at 
Warren was 6.2 feet on the 5th, 0.8 foot below flood 
stage. Heavy rain on April 1-2, 1970 caused a moderate 
rise in Mahoning River Basin and a minor flood in 
upper Ohio River Basin. For this storm and flood crest 
stage reductions attributed to this reservoir were 1.3 
feet at Warren, 0.9 foot at Youngstown and 0.1 foot 
each at Montgomery, Pike Island and lock 14, Ohio 
River. Crest stages on Mahoning River at Warren and 
Youngstown were 6.7 and 8.4 feet, respectively. From 
this storm and flood reservoir pool reached elevation 
986.6, with a storage of 59,700 acre-feet or 14 percent of 
usable summer flood control storage. Heavy rainfall on 
June 26-27, 1970 caused a minor rise in Mahoning 
River Basin. For this storm and flood crest stage 
reduction attributed to reservoir was 1.2 feet at 
Warren. Crest stage on Mahoning River at Warren 
was 6.9 feet. From this storm and flood the reservoir 
reached year-high elevation of 987.0 with a storage of 
60,900 acre-feet or 19 percent of usable summer flood 
control storage. Estimated flood control benefits 
achieved by this reservoir for the fiscal year were $336, 
000. Total flood control benefits for this reservoir 
through June 30, 1970 are $2,364,000. Regulated flows 
at Leavittsburg, Ohio, in conjunction with Berlin Lake 
for 98 days during period July-October 1969 and 42 
days during May and June 1970 averaged 316 cubic 
feet per second, representing 232 percent of natural low 
flow. Thus, this reservoir, in conjunction with Berlin 
Lake, achieved significant benefits from low flow 
augmentation in the upper Mahoning River and, in 
conjunction with Mosquito Creek Lake, along the 
highly industrialized Mahoning River below Niles, 
Ohio. Activities under reservoir management program 
comprising sanitation measures, conservation, land 
management, and operation and maintenance of 
public-use facilities continued. 
Condition at end of fiscal year. Construction of project 
began in July 1962 and is essentially complete. 
Construction of dam and access road was started in 
782

PITTSBURGH, PA., DISTRICT 
May 1963 and completed in November 1966. All 258 
surface tracts of land authorized for acquisition have 
been acquired. Of 44 subsurface tracts authorized for 
acquisition, 27 have been acquired. 
36. WOODCOCK CREEK LAKE, PA. 
Location. In Crawford County, northwestern Pennsylvania, 
on Woodcock Creek, a tributary of French 
Creek. Damsite is about 4.1 miles above mouth of 
Woodcock Creek and about 5 miles northeast of 
Meadville, Pa. (See Geological Survey Chart for 
Meadville, Pa.) 
Existing project. Provides for construction of floodcontrol 
reservoir dam of rolled earth embankment 
type, gate controlled outlet works with a 6 foot wide by 
7.75-foot-high conduit and uncontrolled saddle spillway 
on the left abutment. Dam will be 4,650 feet long 
at top rising 90 feet above streambed and provide for 
gross capacity of 20,000 acre-feet from a drainage area 
of 46 square miles. Reservoir will be operated as one of 
three-reservoir system for reduction of flood stages in 
French Creek Basin between damsite and mouth, 
Allegheny River from Franklin, Pa., to Pittsburgh, Pa., 
inclusive, and upper Ohio River Valley. Project was 
authorized for flood control and recreation by 1962 
Flood Control Act. Storage for water quality control 
was added to the project during the preconstruction 
planning stage. Estimated Federal cost for new work 
(1970) is $18,600,000. 
Local cooperation. Local interests must inform affected 
interests in French Creek Basin at least annually, in a 
manner satisfactory to District Engineer, that a system 
of reservoirs of which Woodcock Creek Lake is a part, 
will not provide protection against maximum floods. 
Pennsylvania Department of Forests and Waters 
assumed responsibility of local cooperation for project. 
Operations and results during fiscal year. New work: 
Design memorandum covering dam and access road 
was completed, work advertised and a contract 
awarded on June 24, 1970. Acquisition of land 
continued at cost of $335,400. Relocation of Legislative 
Route 20065, Section 1 was continued under contract 
and advanced to 66 percent completion at cost of $420, 
000. Preparation of plans and specifications for 
relocation of remaining highways were completed. 
Condition at end of fiscal year. Relocation of initial 
highways is 66 percent complete and plans for 
relocating remaining highways are complete. Construction 
of dam is about to be started. Of 113 tracts of 
land authorized for acquisition, 98 have been acquired. 
37. YOUGHIOGHENY RIVER LAKE, OHIO 
RIVER BASIN, PA. AND MD. 
Location. Dam is on Youghiogheny River about 74.2 
miles above its junction with Monongahela River at 
McKeesport, Pa. It is 1.2 miles upstream from 
Confluence, Pa., and about 57 miles southeast of 
Pittsburgh, Pa. Reservoir is in Fayette and Somerset 
Counties, Pa., and Garrett County, Md. (See Geological 
Survey Charts for Confluence, Pa., Accident, 
Md., West Virginia and Pennsylvania.) 
Existing project. Reservoir for flood control, navigation 
aid, and pollution abatement purposes. Dam is rolledearthfill 
type with separate uncontrolled side channel 
spillway and tunnel outlet works. Project was selected 
for construction under general authorization for Ohio 
River Basin in 1938 Flood Control Act. For further 
project description see Annual Report for 1962, page 
1223. Federal cost of completed project was $9,674,904. 
Construction of additional recreation facilities for 
completed project is estimated to cost $1,853,200 
(1970), raising total project cost estimate to $11,528, 
104. 
Operations and results during fiscal year. New work: 
Preparation of plans for future recreation development 
continued at cost of $15,600. Bids were solicited for 
construction of crushed stone road at Tub Run 
recreation area. Drilling of water wells was completed 
under contract at cost of $6,465. Operation and 
maintenance, general: Reservoir was operated for 
benefit of flood control, as required, and necessary 
repairs were made to structures and appurtenances at 
cost of $182,335. Melting snow on January 24-26, 1970, 
augmented by rainfall on the 29th-30th, caused a 
moderate rise in the Youghiogheny River Basin and in 
upper Ohio River at Pittsburgh, during which this 
reservoir, in conjunction with other reservoirs in upper 
Ohio River Basin, achieved significant reductions. For 
this storm and flood crest stage reductions effected by 
this reservoir varied from 1.8 feet at Connellsville to 0.6 
foot at Pittsburgh. Crest stage on Ohio River at 
Pittsburgh was 18.5 feet, 0.5 foot above damage stage. 
From this storm and flood reservoir reached elevation 
1431.2 with a storage of 133,100 acre-feet or 20 percent 
of usable seasonal flood control storage. Rainfall on 
April 1-3, 1970, augmented by melting snow, caused a 
major rise in Youghiogheny River Basin and a minor 
flood in upper Ohio River at Pittsburgh, during which 
this reservoir, in conjunction with other reservoirs in 
upper Ohio River Basin, achieved significant reductions. 
For this storm and flood crest stage reductions 
effected by this reservoir varied from 2.0 feet at 
Connellsville to 0.7 foot at Pittsburgh. Crest stage on 
Ohio River at Pittsburgh was 25.6 feet, 0.6 foot above 
flood stage. From this storm and flood reservoir reached 
elevation 1455.0, with a storage of 203,000 acre-feet or 
54 percent of usable summer flood control storage. 
Heavy rainfall on April 23-25, 1970 caused another 
major rise in Youghiogheny River Basin and a minor 
rise in upper Ohio Basin at Pittsburgh, during which 
this reservoir, in conjunction with other reservoirs in 
upper Ohio River Basin, achieved significant reductions. 
For this storm and flood crest stage reduction 
effected by this reservoir at Pittsburgh was 0.4 foot. 
Crest stage on Ohio River at Pittsburgh was 17.4 feet, 
0.6 foot below damage stage. From this storm and flood 
reservoir reached year-high elevation of 1456.2, with a 
783

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
storage of 206,900 acre-feet or 58 percent of usable 
summer flood control storage. A minor rise occurred on 
August 18-20, 1969 during which this reservoir 
achieved a reduction of 0.2 foot at Connellsville. Minor 
rises also occurred on December 7-11, 1969, December 
30,1969-January 2, 1970, February 2-4 and March 2-5, 
1970 during which this reservoir achieved reductions at 
Pittsburgh of 0.15, 0.1, 0.2 and 0.3 foot, respectively. 
Crest stages on Ohio River at Pittsburgh for these rises 
were 18.0, 17.4, 18.1 and 17.0 feet, respectively. In 
conjunction with other reservoirs, during six moderate 
rises the reservoir prevented overtopping of Monongahela 
Parking Wharf in Pittsburgh for a total of 8 
days. Estimated flood control benefits achieved by this 
reservoir for fiscal year were $2,054,000. Total flood 
control benefits for this reservoir through June 30, 1970 
are $58,484,000. Regulated low flow at Connellsville, 
Pa. for 113 days during period July-December 1969, 7 
days in January 1970 and 16 days during May-June 
1970, averaged 1,290 cubic feet per second, representing 
155 percent of natural low flow. Thus, this 
reservoir achieved significant benefits from low-water 
augmentation. Activities under reservoir management 
program comprising sanitation measures, conservation, 
land management and operation and maintenance of 
public-use facilities were continued. 
Condition at end of fiscal year. Authorized project is 
complete. Reservoir is in operation for flood control, 
navigation, and pollution abatement purposes. For 
flood control, reservoir is operated as a unit of 
coordinated reservoir system designed for protection of 
Pittsburgh and reduction of flood heights in upper 
Ohio Valley, generally. Construction of dam was 
started June 1940 and completed May 1944. Land 
acquired for project consists of 3,914.9 acres in fee 
simple and flowage easement over 0.48 acre. A license 
was issued Commonwealth of Pennsylvania covering 
fish conservation and management in Pennsylvania 
portion of reservoir. Future work consists of provision 
on project lands of additional recreational facilities as 
required to serve public needs. 
38. YOUNGSTOWN, OHIO 
Location. In Mahoning County within city limits of 
Youngstown, along lower reaches of Crab Creek, a 
tributary of Mahoning River. (See Geological Survey 
Chart for Youngstown, Ohio.) 
Existing project. Provides for widening, deepening, and 
paving, with some realignment, channel of lower Crab 
Creek for about 2.2 miles above its mouth. Project 
would eliminate damages in Crab Creek area from all 
floods up to that of January 1959 flood of record and 
would greatly reduce damages that might be associated 
with greater floods. Project was authorized by Flood 
Control Act of 1962. Estimated Federal cost for new 
work (1970) is $3,800,000; estimated non-Federal cost 
of lands, damages, and construction adjustments is 
$500,000. 
Local cooperation. Responsible local interests must 
provide lands, rights-of-way, and borrow and spoildisposal 
areas for construction; bear cost of sewer, 
drain, pipeline, railroad and other utility alterations, 
and of changes in existing structures as necessary, 
except the three railroad bridges; bear all additional 
cost resulting from construction of cutoff channel near 
Andrews Avenue if such is desired and requested by 
city of Youngstown as an alternative to improvement 
proposed by District Engineer; hold United States free 
from damages; establish appropriate channel lines up 
to northern city limit to prevent any encroachment on 
flood-carrying capacities of improved and natural 
creek channel; prevent dumping of solid industrial and 
other wastes in creek; inform affected interests at least 
annually of limited degree of protection provided by 
project; enlarge waterway openings or clearances of 
restrictive bridges downstream of Valley Street at such 
future times as might be feasible, in accordance with 
standards prescribed by Secretary of Army; and 
maintain and operate project works after completion. 
Youngstown City Council, after being informed of 
details of project design and related requirements, 
adopted a resolution dated May 12, 1965 providing 
required formal assurances and expressing their 
preference for the cutoff plan of improvement near 
Andrews Avenue and their willingness to bear additional 
cost of cutoff. Assurances of local cooperation 
were accepted by District Engineer on September 9, 
1965. Local interests granted Government unqualified 
right-of-entry for construction purposes on June 27, 
1969. 
Operations and results during fiscal year. New work: 
Limited preconstruction planning continued. Penn 
Central Railroad in process of awarding contract for 
construction of three railroad bridges, the work to be 
performed on a cost-reimbursable basis. Contract 
awarded June 8, 1970 for construction of flood 
protection project with work to date being confined to 
layout and mobilization operations. 
Condition at end of fiscal year. Construction of project 
was started in June 1970. 
39. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Flood Control Act of June 22, 1936, and subsequent 
acts require local interests furnish assurances that they 
will maintain and operate certain local protection 
projects after completion in accordance with regulations 
prescribed by Secretary of the Army. District 
Engineers are responsible for administration of these 
regulations within boundaries of their respective 
districts. Maintenance inspections were made during 
fiscal year of 30 projects transferred to local interests for 
maintenance and operation as listed in table at end of 
chapter. Local interests were advised as necessary, of 
measures required to maintain these projects in 
accordance with standards prescribed by regulations. 
784

PITTSBURGH, PA., DISTRICT 
Inspection of completed flood control works and dates 
of inspections are set forth in table 25-I. 
Fiscal year costs were $14,864. Total cost to June 30, 
1970 was $138,063. 
40. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 25-J on other authorized flood control 
projects. 
41. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 205, Public Law 
858, 80th Congress, as amended (preauthorization) 
(See table 25-K on flood control work under special 
authorization.) 
Flood control and coastal emergencies (Public Law 99, 84th 
Cong., and antecedent legislation) 
Fiscal year costs were $34,414, of which $19,220 was 
for advance preparation and $15,194 for emergency 
operations.
GENERAL INVESTIGATIONS 
42. SURVEYS 
Fiscal year costs were $250,765, of which $237,703 
was for flood control studies, $13,062 for special studies. 
43. COLLECTION AND STUDY OF BASIC 
DATA 
Fiscal year costs were $164,538. Flood plain information 
studies were completed for Meadville, Pa.; 
Olean, New York; Allegany, New York; and North 
Huntington Township, Pa. Flood plain information 
studies are underway for Jamestown-Falconer, New 
York; Wheeling-Ohio County, West Virginia; Brooke 
County, West Virginia; Jefferson County, Ohio; 
Triadelphia-Valley Grove, West Virginia; North 
Charleroi to Elco, Pa.; California to W. Brownsville, 
Pa.; Centerville to E. Bethlehem, Pa.; Union Township 
to Monongahela, Pa.; Carroll Township to 
Donora, Pa.; Hancock County, West Virginia; Belmont 
County, Ohio; Jefferson Borough, Pa.; and 
Cochranton, Pa. Technical assistance was rendered to 
Federal and non-Federal agencies under the Flood 
Plain Management Services Program. See Table 25-L 
for table on completed flood plain studies. 
44. RESEARCH AND DEVELOPMENT 
Hydrologic studies consisting of collection and 
analysis of hydrologic and hydraulic data were 
performed during year at cost of $7,183. 
785

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 25-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 
1. Allegheny River, New Work 
Pa. Approp. $ - $ - $ - $ - $ 
3. Lake Erie-Ohio 
River Canal, 
Ohio and Pa. 
4. Monongahela 
River, Pa. and 
W. Va. 
6. Tygart Lake, 
W. Va. 
7. Youghiogheny 
River, Pa. 
and Md. 
9. Berlin Lake, 
Ohio River Basin 
Ohio 
10. Black Fork at 
Hendricks, 
W. Va. 
11. Buckhannon, 
W. Va. 
12. Chartiers 
Creek, Pa. 
(Federal Funds) 
(Contributed 
Funds) 
13. Conemaugh River 
Lake, Ohio 
River Basin, Pa. 
14. Crooked Creek 
Lake, Ohio 
River Basin, Pa. 
15. DuBois, Pa. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
728,000 
740,615 
525,000 
470,711 
8,123,069 
8,226,004 
1,603,500 
1,509,863 
75,000 
77,135 
602,500 
618,399 
742,000 
530,649 
301,000 
2,222,089 
1,552,000 
1,703,004 
88,000 
95,522 
863,900 
859,097 
75,000 
333,691 
25,000 
460,790 
1,868,000 
1,622,874 
106,500 
100,521 
682,452 
669,672 
5,595 
25,000 
41,847 
1,936,014 
2,011,904 
143,564 
142,375 
5,000 
60,000 
21,959 
133,500 
125,220 
4,000 
125,000 
2,634 
310,000 
284,759 
61,700 
58,489 
54,200 
91,136 
30,000 
10,094 
100,000 
79,055 
143,700 
162,307 
2,181 
710,000 
822,730 
475,000 
310,972 
196,600 
72,300 
78,046 
39,100 
55,214 
73,000 
84,492 
59,377 
217,000 
189,326 
46,000 
185,000 
516,096 
1,832,000 
1,635,397 
165,000 
335,961 
93,000 
80,380 
101,600 
101,609 
1,412 
167,000 
25,728 
211,807 
232,347 
4,468 
25,000 
84,418 
1,875,000 
1,964,662 
507,140 
49,638 
80,326 
93,480 
88,480 
90,354 
100,000 
6,988 
786 
Total to 
June 30, 1970 
18,157,8601 
18,157,860 
18,373,9202 
18,353,7172 
1,342,000 
1,340,646 
127,666,8133 
127,591,9103 
59,786,8143,4 
59,609,5043 ,4 
18,431,8445 
18,431,8445 
1,744,963 
1,736,172 
47,1956 
47,1956 
182,1687 
177,168 
7,381,6768 
7,224,096 
1,929,296 
1,920,437 
50,000 
6,649 
1,558,000 
1,545,874 
4,599,303 
4,284,497 
868,740 
385,599 
45,684,41110 
45,684,41110 
951,032 
950,368 
4,204,88811 
4,204,88811 
1,274,332 
1,273,883 
203,00025 
102,986

TABLE 25-A (Continued) 
PITTSBURGH, PA., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 67 FY 68 FY 69 FY 70 June 30, 1970 
16. East Branch, 
Clarion River 
Lake, Ohio 
River Basin, Pa. 
17. Elkins, W. Va. 
18. Johnstown, Pa. 
19. Kinzua Dam & 
Allegheny 
Reservoir, Ohio 
River Basin, Pa. 
and N.Y. 
20. Loyalhanna 
Lake, Ohio 
River Basin, Pa. 
21. Mahoning Creek 
Lake, Ohio 
River Basin, Pa. 
22. Mosquito Creek 
Lake, Ohio 
River Basin, Ohio 
23. Muddy Creek 
Dam, Pa. 
24. Ohio River 
Basin, Pittsburgh, 
Pa. District 
Consolidated 
25. Punxsutawney, 
Ohio River 
Basin, Pa. 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
$ 600 $ 
44,883 
100,100 
70,725 
3,000 
1,187 
31,700 
2,304 
8,000,000 5 
9,441,643 4 
96,700 
96,045 
79,200 
111,975 
59,200 
54,265 
103,200 
93,499 
110,000 
98,908 
8,000 
6,410 
26,700 
35,305 
67,650 
99,275 
-1,000 
1,123 
-8,600 
1,476 
,963,000 
,106,250 
121,850 
121,445 
76,800 
82,382 
76,100 
83,724 
91,650 
116,759 
18,317 
88,900 
80,263 
2,600 
513 
33,400 
23,905 
1,346,603 
154,000 
155,185 
83,000 
69,291 
100,500 
98,458 
94,500 
96,020 
1,590 
1,600 
13,287 
25,600 
13,546 
109,867 
119,713 
6,087 
1,981 
26,284 
35,930 
155,000 
1,316,537 
215,092 
211,783 
96,553 
108,575 
99,631 
101,697 
92,042 
92,119 
100,000 
18,929 
40,000 
8,213 
15,100 
20,590 
$ 9,524,60112 
9,524,601 
960,407 
959,716 
1,772,627 
1,772,627 
52,787 
46,407 
8,865,38813 
8,865,38813 
404,296 
384,465 
106,229,49314,28 
105,961,15714 
629,042 
624,845 
5,452,86215 
5,452,86215 
1,272,302 
1,269,639 
6,421,34516 
6,421,34516 
1,224,764 
1,224,377 
47,033 
47,033 
4,035,400 
4,035,400 
1,118,653 
1,114,594 
325,000 
243,929 
948,71717 
916,923" 
3,586,10718 
3,586,10718 
202,300 
191,609 
787

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 25-A (Continued) 
Se 
Sec 
in"
e
ction 
Text Project 
26. Ridgway 
and vicinity, 
Pa. 
27. Rowlesburg 
Lake, W. Va. 
28. Salamanca, N.Y. 
29. Shenango River 
Reservoir, Ohio 
River Basin, Pa. 
and Ohio 
30. Stonewall 
Jackson Lake 
W. Va. 
31. Tenmile Creek 
at Marianna, Pa. 
32. Tionesta Lake, 
Ohio River 
Basin, Pa. 
33. Turtle Creek, 
Pa. 
34. Union City 
Dam, Pa. 
35. West Branch 
Lake, Mahoning 
River, Ohio 
(Federal Funds) 
(Contributed 
Funds) 
36. Woodcock Creek 
Lake, Pa. 
37. Youghiogheny 
River Lake, 
Ohio River 
Basin, Pa. and Md. 
38. Youngstown, 
Ohio 
Funding 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY 67 FY 68 FY 69 FY 70 June 30, 1970 
16,326 
746,584 
482,990 
35,000 
42,541 
2,968,000 
3,762,878 
84,100 
82,728 
281 
15,000 
4,588 
192,200 
159,101 
2,950,000 
2,647,417 
1,140,000 
893,483 
1,235,000 
2,058,181 
50,500 
50,104 
31,047 
260,000 
114,026 
-600 
8,293 
153,600 
156,294 
195,000 
15,657 
$ 5,000 
5,319 
700,000 
620,201 
200,000 
84,287 
314,068 
1,812,720 
117,800 
119,636 
375,000 
168,945 
11,530 
150,000 
18,911 
303,350 
333,066 
713,000 
959,644 
995,000 
1,309,566 
150,000 
488,405 
100,900 
102,579 
550,000 
640,863 
26,000 
1,905 
139,300 
144,054 
20,000 
7,141 
$ 45,000 
24,499 
129,000 
412,249 
1,271,000 
722,822 
305,000 
636,158 
148,700 
149,280 
243,000 
239,551 
100,000 
21,488 
15,000 
120,510 
162,000 
151,278 
200,000 
17,645 
2,271,000 
2,477,261 
200,167 
428,341 
101,500 
101,450 
814,000 
670,270 
100,000 
72,253 
221,500 
218,597 
195,000 
17,988 
16,579 
949,500 
94,978 
799,000 
919,594 
508,800 
574,105 
168,597 
167,559 
635,500 
244,418 
390,000 
11,097 
185,000 
37,470 
177,054 
184,060 
-30,000 
342,129 
3,949,200 
2,909,972 
95,000 
93,282 
132,073 
127,903 
1,400,000 
1,221,774 
85,000 
24,405 
180,840 
182,335 
-10,000 
24,082 
$ 79,964 
75,104 
2,645,08429 
1,720,955 
2,600,00026 
1,890,629 
33,795,54919 
33,726,62520 
549,197 
547,532 
1,253,50030 
652,914 
541,50032 
65,164 
5,664,20521,33 
5,480,6842 
2,046,554 
2,033,680 
15,370,471 
15,260,896 
9,155,200 
8,112,235 
17,245,167 
17,192,671 
393,973 
389,285 
3,230,000 
3,230,000 
3,215,70031 
2,821,890 
9,935,572',34 
9,890,099 
1,999,260 
1,996,566 
775,00027 
205,854 
788

1. Includes $2,453,737 from emergency relief funds and 
$1,250,049 from public works funds. 
2. Includes $64,354 public works acceleration, executive 
funds (1963). 
3. Includes $5,420,541 for new work and $742 for 
maintenance for previous project. 
4. Includes $22,549 public works acceleration, executive 
funds (1963). 
5. $1,999,995 emergency relief funds and $10,000,000 
public works funds. 
6. Previous project data. 
7. Includes $1,700 expended under previous project. 
8. Includes $926,000 Code 711 funds and $167,000 Code 
712 funds. 
9. Includes $920,000 Code 711 funds and $14,553 Code 
712 funds. 
10. Includes $5,351 from emergency relief funds. 
11. Includes $63,788 from emergency relief funds. 
12. Includes $141,828 Code 711 funds. 
13. Includes $33,423 from emergency relief funds. 
14. Includes $2,791 from emergency relief funds. 
15. Includes $7,339 from emergency relief funds. 
16. Includes $25,671 emergency relief funds. 
17. Includes $8,914 from emergency relief funds. 
18. Excludes $180,485 for new work expended from 
contributed funds. 
19. Includes $50,000 Code 711 funds. 
20. Includes $17,784 Code 711 funds. 
21. Includes $265,804 Code 711, $30,000 Code 712 and 
$24,201 emergency relief funds. 
22. Includes $251,055 Code 711, $16,228 Code 712 and 
$24,201 emergency relief funds. 
23. Includes $260,668 Code 711 funds. 
24. Includes $215,195 Code 711 funds. 
25. Includes $100,000 placed in FY 1970 Budget Reserve for 
allocation in FY 1971. 
26. Includes $501,000 placed in FY 1970 Budget Reserve for 
allocation in FY 1971. 
27. Includes $508,000 placed in FY 1970 Budget Reserve for 
allocation in FY 1971. 
28. Includes $25,000 placed in FY 1970 Budget Reserve for 
allocation in FY 1971. 
29. Includes $900,000 placed in FY 1970 Budget Reserve for 
allocation in FY 1971. 
30. Includes $600,000 placed in FY 1970 Budget Reserve for 
allocation in FY 1971. 
31. Includes $163,000 placed in FY 1970 Budget Reserve for 
allocation in FY 1971. 
32. Includes $375,000 placed in FY 1970 Budget Reserve for 
allocation in FY 1971. 
33. Includes $70,000 Code 711 funds and $85,000 Code 712 
funds placed in FY 1970 Budget Reserve for allocation in FY 
1971. 
34. Includes $70,000 Code 711 funds placed in FY 1970 
Budget Reserve for allocation in FY 1971. 
789 
TABLE 25-A (Continued) 
PITTSBURGH, PA., DISTRICT 
COST AND FINANCIAL STATEMENT

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 25-B AUTHORIZING LEGI 
Acts Work Authorized 
ALLEGHENY RIVER, PA. (See Section 1 of Text) 
For lock and dam 1. (Fixed dam contemplated. 
Sept. 29, 1891 Secretary of War authorized change 
to a movable dam.) 
For locks and dams 2 and 3 
For locks and dams 4 to 8, inclusive 
For a depth of 9 feet in the lower 61 miles. 
Replace lock and dam 1 by a dredged channel, 9 feet 
deep and 200 feet wide up to lock 2, and construct 
new locks and dams 2 and 3, to replace existing locks 
and dams 2 and 3. 
Construct lock and dam 9, raising crest of dam 8, and 
dredging a navigable channel in head of pool 8. 
Operation and care of locks and dams provided for with 
funds from War Department appropriation for rivers 
and harbors. 
Aug. 5, 1886 
June 3, 1896 
July 25, 1912 
July 3, 1930 
Aug. 30, 19351 
Aug. 30, 19351 
June 26, 19342 
Mar. 3, 1899 
June 13, 1902 
Mar. 3, 1905 
Mar. 3, 1905 
Mar. 2, 1907 
Mar. 4, 1913 
Sept. 22, 1922 
July 3, 1930 
Jan. 31, 19313 
June 26, 19344 
May 17, 1950 
Annual Report 1886, p. 1545, and 
Annual Report, 1891, p. 2366. 
H. Doc. 204, 54th Cong., 
1st sess. and Annual Report, 
1896, p. 2212. 
H. Doc. 540, 62d Cong., 2d 
sess. 
H. Doc. 356, 71st Cong., 
2d sess. 
Rivers and Harbors Committee, 
Doc. 16, 72d Cong., 
1st sess. 
H. Doc. 721, 71st Cong., 
3d sess., and Rivers and 
Harbors Committee, Doc. 27, 
73d Cong., 2d sess. 
Annual Report, 1897, 
p. 2423. 
Annual Report, 1909, 
p. 1756. 
Annual Report, 1904, 
p. 460. 
H. Doc. 209, 58th Cong., 
2d sess. 
H. Doc. 209, 58th Cong., 
2d sess. 
H. Doc. 1217, 62d Cong., 
3d sess. 
H. Doc. 288, 67th Cong., 
2d sess. 
Rivers and Harbors Committee 
Doc. 22, 70th Cong., 
2d sess. 
S. Doc. 100, 81st Cong., 
1st sess. 
790 
ISLATION 
Documents 
MONONGAHELA RIVER, PA. AND W. VA. (See Section 4 of Text) 
Enlarge and improve lock and dam 6; additional works at 
lock 3; new repair steamer and new dredge boat with 
equipment; all at an estimated cost of $185,556. 
Rebuild lock and dam 2 at estimated cost of $655,961. 
(Estimate increased in 1910 to $698,961). 
Acquisition of land and additional improvements at 
5 and 6 at a cost of $7,850. 
Rebuild lock and dam 3 at estimated cost of $589,196. 
Reconstruct lock and dam 5 at estimated cost of $756,042. 
Reconstruct lock and dam 6 at estimated cost of 
$356,400. (Estimate increased in 1916 to 
$418,860.) 
Additional improvements at estimated cost as follows: 
Guide walls and guard walls, 1 to 6, $1,255,130; 
Lengthen land chamber of lock 3 to 720 feet, $787,722; 
New chamber (360 feet long), lock 4, $699,786; Lock and 
dam 7, $1,161,241; Lock and dam 8, $1,165,758; Lock and dam 
7 (second chamber), $419,126; Lock and dam 8 (second 
chamber), $504,465; Reconstruct dam 4, $397,211; Marine 
ways, repair plant, office and warehouse, $250,000, for a 
total of $6,640,439. 
Construct new locks and dam 2.5 miles below existing 
structure, at estimated cost of $2,175,000 in lieu of 
work authorized at old lock and dam 4. 
Chief of Engineers authorized to locate new locks and 
dam 4 above existing structure and on such site as 
they may deem most desirable. 
Operation and care of locks and dams provided for with 
funds from War Department appropriations for rivers 
and harbors. 
Modification of existing project as follows: 
Provide 2 new locks and dams similar to 
Morgantown lock and dam to replace existing locks 
and dams 12 to 15, inclusive. 
Provide a movable crest on existing dam 8 to raise 
existing pool-full elevation 4 feet. 
Provide a navigation channel of 300-foot minimum 
bottom width and a 9-foot project depth above 
lock and dam 8.

TABLE 25-B (Continued) 
PITTSBURGH, PA., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Provide an extension of navigable channel of upper 
Monongahela River, into lower Tygart River for 2.1 
miles at a maximum bottom width of 200 feet and a 
9-foot project depth. 
OHIO RIVER BASIN (Pittsburgh Dist.) (See Section 24 of Text) 
Aug. 28, 1937 Construct levees, floodwalls, and drainage structures Flood Control Committee 
for protection of cities and towns in Ohio River Basin. Doc. 1, 75th Cong., 1st 
Projects to be selected by Chief of Engineers with Sess. 
approval of Secretary of War at a cost not to exceed 
$24,877,000 for construction. 
June 28, 1938 Approved general comprehensive plan for flood control and Flood Control Committee 
other purposes in Ohio River Basin as may be advisable in Doc. 1, 75th Cong., 1st 
discretion of Secretary of War and Chief of Engineers, Sess.s 
and for initiation and partial accomplishment of plan, 
authorized $75 million for reservoirs and $50,300,000 
for local flood protection works. 
Aug. 18, 1941 Additional $45 million for prosecution of comprehensive 
plan for Ohio River Basin. 
Dec. 22, 1944 Additional $70 million for further prosecution of H. Doc. 762, 77th Cong., 
comprehensive plan for Ohio River Basin, including 2d sess. 
additional projects in tributary basins. 
July 24, 1946 Additional $125 million for further prosecution of H. Doc. 506, 78th Cong., 
comprehensive plan including additional projects 1st Sess. 
in tributary basins. 
May 17, 1950 Additional $100 million for prosecution of comprehensive 
plan for Ohio River Basin. 
Dec. 30, 1963 Additional $150 million for further prosecution of 
comprehensive plan for flood control and other 
purposes in Ohio River Basin. 
June 18, 1965 Additional $89 million for further prosecution of H. Doc. 6755, 89th Cong., 
comprehensive plan for Ohio River Basin. 1st Sess. 
Aug. 13, 1968 Additional $35 million for further prosecution of 
comprehensive plan for Ohio River Basin. 
1. Included in the Emergency Relief Administration program 
April 8, 1935. 
2. Permanent Appropriations Repeal Act. 
3. Public Res. 117, 71st Cong., 3d sess. 
4. Permanent Appropriations Repeal Act. 
791

ALLEGHENY RIVER, PA.: LOCKS AND DAMS 
TABLE 25-C (See Section 1 of Text) 
Dimensions 
Upper 
Width Avail- Lift at Normal Year 
LfMilest No al DepthsonMiter Character of Type of Pe Opnd Estimated or 
MouthCha-Pool vation Pool Level1 Foundation Construction to 
ber to Full Level (feet, Nayt- 
(feet) Width (feet) mean sea Lower Upper Kind of Lock Dam gation 
(feet) level) (feet) (feet) Dam Lock Dam 
2 6.7 Aspinwall, Pa. 56 360 11.0 721.0 19.0 10.9 Rock Rock Fixed Concrete Concrete 100 19342 $ 1,763,485 
3 14.5 Cheswick, Pa. 56 360 13.5 734.5 10.8 11.8 Rock Pile-rock Fixed Concrete Concrete 100 19342 1,875,665 
4 24.2 Natrona, Pa. 56 360 10.5 745.0 10.0 8.5 Rock Rock Fixed Concrete Concrete 100 1927 1,707,690 
5 30.4 Freeport, Pa. 56 360 11.8 756.8 10.5 10.3 Piling Crib-pile Fixed Concrete Concrete 100 1927 1,940,537 
6 36.3 Clinton, Pa. 56 360 12.2 769.0 10.6 10.8 Rock Crib-pile Fixed Concrete Concrete 100 1928 1,523,959 
7 45.7 Kittanning, Pa. 56 360 13.1 782.1 9.8 10.9 Piling Crib-pile Fixed Concrete Concrete 100 1930 1,460,008 
8 52.6 Templeton, Pa. 56 360 17.9 800.0 10.4 13.8 Rock Rock-pile Fixed Concrete Concrete 100 1931 2,848,920 
9 62.2 Rimer, Pa. 56 360 22.0 822.0 10.5 11.3 Rock Rock Fixed Concrete Concrete 100 1938 2,510,373 
Total $15,630,637 
Abandoned lock and dam 1 591,187 
Abandoned lock and dam 2 544,929 
Abandoned lock and dam 3 310,103 
Demolishing old dam 1 26,001 
Dredging channel 1,055,003 
Total $18,157,860 
1. All depths as shown are on guard sills and are controlling depth. 
2. Dates shown represent replacement structures. 
J. 
cc 
0
OEM 
m
0
' 
0a 
z3 
z
IDl

MONONGAHELA RIVER, PA. AND W. VA.: LOCKS AND DAMS 
TABLE 25-D (See Section 4 of Text) 
Dimensions 
Avail- Upper 
Width able Lift at Normal Pe Year 
Miles of Length Normal Pool Ele- DepthSilals ton Miter Character of Type of cent Opened Estimated or 
No. Above Nearest Town Cham- ttoo FFuullll Pool vation PPooooll LLeevveelll Foundation Construction Com- to 1 Com N Actual Cost 
Mouth ber Width Level (feet, l Navi- 
(feet) (feet) (feet) mean sea Lower Upper Lock Dam Lock Dam gation 
level) (feet) (feet) 
2 11.2 Braddock, Pa. 56 360 8.7 718.7 16.0 15.95 Rock Crib pile Concrete Concrete 100 19532 $ 17,872,2127 
110 720 
3 23.8 Elizabeth, Pa. 563 360 8.2 726.9 11.6 11.9 Rock Crib pile Concrete Concrete 100 19072 1,681,538 
720 
4 41.5 Monessen, Pa. 563 360 16.6 743.5 10.7 20.0 Piles Piles Concrete Concrete 100 1932 17,373,767 
720 
- 61.2 Maxwell locks and dam 843 720 19.5 763.0 15.0 20.5 Rock Rock Concrete Concrete 100 1964 30,120,0005 
Maxwell, Pa. 
7 85.0 Greensboro, Pa. 56 360 15.0 778.0 10.0 10.5 Rock Rock Concrete Concrete 100 19252 2,639,804 
8 90.8 Point Marion, Pa. 56 360 19.0 797.0 10.0 14.5 Rock Rock Concrete Concrete 100 1925 5,408,4954 
- 102.0 Morgantown lock and 84 600 17.0 814.0 14.5 17.8 Rock Rock Concrete Concrete 100 1950 8,778,000 
dam, Morgantown, 
W. Va. 
- 108.0 Hildebrand lock and dam, 84 600 21.0 835.0 15.0 14.0 Rock Rock Concrete Concrete 100 1959 12,506,829 
6 miles above Morgantown, 
W. Va. 
- 115.4 Opekiska lock and dam, 84 600 22.0 857.0 14.0 17.75 Rock Rock Concrete Concrete 100 1964 25,200,0005 
13.4 miles above 
Morgantown, W. Va. 
Marine ways, etc. 250,000 
Abandoned lock and dam 1 1,019,907 
Abandoned lock and dam 4 780,816 
Abandoned lock and dam 5 1,074,812 
Abandoned lock and dam 6 770,449 
Abandoned lock and dam 7 213,776 
Abandoned lock and dam 8 245,900 
Abandoned lock and dam 9 191,000 
Abandoned lock and dam 10 210,445 
Abandoned lock and dam 11 227,668 
Abandoned lock and dam 12 200,550 
Abandoned lock and dam 13 190,691 
Abandoned lock and dam 14 210,127 
Abandoned lock and dam 15 175,829 
Dredging 587,899 
Total $127,930,514 
1. All depths as shown are on guard sills and are controlling depths. 5. Estimated. 
2. Dates shown for locks and dams Nos. 2 to 8, inclusive, represent reconstruction. 6. Includes $15,200,000 for reconstruction of dam. 
3. 2 chambers. 7. Includes $16,967,114 for reconstruction of locks. 
4. Includes $3,322,057 for raising crest of dam. 
-D 
cc

TABLE 25-E 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
MONONGAHELA RIVER, PA. AND W. VA.: 
TOTAL COSTS OF EXISTING PROJECT TO END OF FISCAL YEAR 
(See Section 4 of Text) 
Operation and 
Funds New Work Maintenance, Total 
General 
Regular $122,171,369 $38,989,626 $161,160,995 
Maintenance and operation - 150,000 150,000 
Public Works acceleration, executive (1963) - 22,549 22,549 
Total $122,171,369 $39,162,175 $161,333,5441 
1. Excludes $20,446,587 expended between July 7, 1897 and June 30, 1937, on operation and care of works of improvement under provisions 
of permanent indefinite appropriation for such purposes. 
TABLE 25-F OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 8 of Text) 
Cost to June 30, 1970 
For Last 
Full report Operation 
See Annual and 
Project Report for Construction Maintenance 
Allegheny River, Pa. open-channel works1 1934 197,000 133,840 
Beaver and Mahoning Rivers, Pa. and Ohio2 1938 - 
Buckhannon River, W. Va. 3 ' 4 1893 5,500 
Cheat River, W. Va.3 ' 4 1895 12,997 
Pittsburgh Harbor, Pa. 1922 110,663 81,613 
1. Completed. 
2. January 23, 1939, Chief of Engineers recommended 
constructing a waterway from Ohio River through Beaver, 
Mahoning, and Grand River Valleys to Lake Erie (H. Doc. 178, 
76th Cong., 1st Sess.). 
3. Abandonment recommended in H. Doc. 467, 69th Cong., 
1st sess. 
4. No commerce reported. 
794

PITTSBURGH, PA., DISTRICT 
TABLE 25-G OHIO RIVER BASIN (PITTSBURGH DISTRICT): LOCAL PROTECTION PROJECTS 
(See Section 24 of Text) 
Location 
Adena, Ohio (Short Creek)2 
Alleghany, N. Y., unit I (Allegheny River)2 
Alleghany, N. Y., unit II (Five Mile Creek area) 2 
Bellaire, Ohio2 
Brackenridge, Tarentum and Natrona, Pa. 
(Allegheny River)2 
Brilliant, Ohio 2 
Brockway, Pa. (Allegheny River Basin) 2 
Clarington, Ohio2 
Coraopolis, Pa.2 
Dillonvale, Ohio (Short Creek)2 
Elkins, W. Va. (Monongahela River Basin)4 ' 5 
Empire and Stratton, Ohio2 
Follansbee, W. Va.2 
Freeport, Pa. (Allegheny River) 2 
Industry, Pa.2 
Johnsonburg, Pa. (Allegheny River Basin)5 
Johnstown, Pa. (Allegheny River Basin) 4' 5 
Kittanning, Pa., part I (Allegheny River) 2 ' 5 
Kittanning, Pa., part II (Allegheny River) 2 
Lake Chautauqua and Chadakoin River, N. Y. 
(Allegheny River Basin)2 
Latrobe, Pa. (Allegheny River Basin)2 ' 5 
Leetsdale, Pa.2 
Martins Ferry, Ohio2 '6 
McKees Rocks, Pa.2 
Mingo Junction, Ohio2 
Moundsville, W. Va.2 
Neville Island, Pa.2 
New Cumberland, W. Va.2 
New Kensington and Parnassus, Pa. 
(Allegheny River)2 
Olean, N. Y. (Allegheny River) 2' 5 
Pittsburgh, Pa. (Golden Triangle) 2 
Pittsburgh, Pa. (North Side)2 
Pittsburgh, Pa. (The Strip)2 
Portville, N. Y. (Allegheny River) 2' 5 
Powhatan Point, Ohio2 
Proctor, W. Va.2 
Punxsutawney, Pa. (Allegheny River Basin)4 ' 5 
Ridgway, Pa. (Allegheny River Basin)2' 5 
Rochester, Pa.2 
St. Marys, Pa. (Allegheny River Basin)2 
Smiths Ferry, Pa.2 
Warwood, W. Va.2 
Wellsburg, W. Va.2 
Type 
of 
Protection 
Channel 
Levee 
Channel and levee 
Wall and levee 
Wall 
Wall 
Wall and levee 
Wall and levee 
Wall 
Channel 
Channel diversion 
Internal drainage 
facilities 
Wall 
Wall 
Wall, levee, and 
channel 
Wall 
Channel 
Wall 
Wall 
Channel 
Channel 
Levee 
Wall and levee 
Wall 
Wall 
Wall and levee 
Wall and levee 
Wall and levee 
Wall 
Levee 
Wall 
Wall 
Wall 
Levee 
Levee 
Levee 
Channel and levee 
Channel 
Wall 
Channel 
Wall 
Wall 
Wall and levee 
795 
Federal 
$ 283,000 
697,000 
668,000 
7,660,000 
11,800,000 
3,240,000 
477,000 
2,710,000 
3,080,000 
388,000 
1,772,6273 
470,000 
2,670,000 
1,480,000 
1,560,000 
674,6643 
8,865,3883 
130,3173 
5,940,000 
6,640,000 
207,6593 
1,270,000 
8,630,000 
5,470,000 
1,920,000 
3,070,000 
3,210,000 
2,760,000 
7,900,000 
3,217,5313 
9,390,000 
22,400,000 
10,700,000 
2,070,4843 
4,720,000 
334,000 
3,586,1073 
628,8883 
3,350,000 
557,000 
2,120,000 
1,740,000 
3,270,000 
Estimated Cost 8 
Non-Federal 
$ 67,000 
65,000 
94,000 
1,870,000 
3,080,000 
276,000 
167,000 
249,000 
466,000 
58,000 
40,000 
13,000 
232,000 
21,000 
136,000 
130,000 
2,000 
352,000 
1,310,000 
44,400 
141,000 
836,000 
197,000 
310,000 
605,000 
1,830,000 
421,000 
148,000 
597,000 
429,000 
1,760,000 
2,560,000 
353,000 
397,000 
121,000 
180,4853 
72,000 
622,000 
17,000 
229,000 
376,000 
1,160,000 
Total 
$ 350,0009 
762,00011 
762,00012 
9,530,000 
14,880,000 
3,516,000 
644,000 
2,959,000 
3,546,000 
466,0009 
1,812,627 
483,00012 
2,902,000 
1,501,000 
1,696,000 
804,664 
8,865,3883 
132,317 
6,292,000 
7,950,00010 
252,059 
1,411,000 
9,466,000 
5,667,000 
2,230,000 
3,675,000 
5,040,000 
3,181,000 
8,048,000 
3,814,531 
9,819,000 
24,160,000 
13,260,000 
2,423,484 
5,117,000 
455,000 
3,766,5923 
700,888 
3,972,000 
574,000 
2,349,000 
2,116,000 
4,430,000

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OHIO RIVER BASIN (PITTSBURGH DISTRICT): LOCAL PROTECTION PROJECTS 
TABLE 25-G (Cont'd) (See Section 24 of Text) 
Location 1 of Estimated Cost 8 
Protection Federal Non-Federal Total 
Wellsville, Ohio, sec. 12, 5 Wall and levee $ 483,9103 $ 113,000 $ 596,910 
Wellsville, Ohio, sec. II 2 ,5 Wall and levee 157,6333 - 157,6333 
West Bridgewater, Pa.2 Wall 2,340,000 517,000 2,857,000 
Wheeling-Benwood, W. Va.2 ' 7 Wall and levee 28,200,000 6,640,000 34,840,0009 
Wheeling, W. Va. (North Wheeling)2 Wall 11,700,000 2,700,000 14,400,000 
Wheeling, W. Va. (Wheeling Island)2 Wall and levee 13,300,000 2,470,000 15,770,000 
Woodlands, W. Va.2 Levee 206,000 28,000 234,000 
1. All projects are on the Ohio River unless otherwise noted. 7. Reported in detail in Annual Report for 1954. 
2. Also see "Other authorized flood control projects." 8. Latest cost estimate revision 1954 unless otherwise noted. 
3. Actual cost. 9. Latest cost estimate revision 1960. 
4. Reported in detail in an individual report. 10. Latest cost estimate revision 1965. 
5. Completed. 11. Latest cost estimate revision 1966. 
6. Reported in detail in Annual Report for 1941. 12. Latest cost estimate revision 1970. 
OHIO RIVER BASIN (PITTSBURGH DISTRICT): RESERVOIRS 
TABLE 25-H (See Section 24 of Text) 
Total 
Tributary Basin and Reservoir Stream Estimated 
Cost 
Allegheny: 
Conemaugh River, Pa.1 Conemaugh River $ 45,684,4112 
Crooked Creek, Pa.1 Crooked Creek 4,204,8882 
East Branch Clarion River, Pa.1 Clarion River 9,524,6012 
Kinzua Dam and Allegheny Reservoir, Pa. and N. Y.1 Allegheny River 107,855,0005 
Loyalhanna, Pa.1 Loyalhanna Creek 5,452,8622 
Mahoning Creek, Pa.1 Mahoning Creek 6,421,3452 
Redbank, Pa.3 Redbank Creek 39,800,0004 
Tionesta, Pa.1 Tionesta Creek 7,759,9015 
Beaver:
Berlin, Ohio1 Mahoning River 8,458,4765 
Eagle Creek, Ohio3 Eagle Creek 12,700,0004 
Mosquito Creek, Ohio1 Mosquito Creek 4,035,4002 
Shenango River, Pa., and Ohio1 Shenango River 39,535,0005 
Monongahela: 
Youghiogheny River, Pa., and Md.1 Youghiogheny River 11,528,1045 
1. Reported in detail in an individual report 
2. Completed, actual cost. 
3. Also see "Other authorized flood control projects." 
4. Latest cost estimate revision 1954. 
5. Latest cost estimate revision 1970. 
796

PITTSBURGH, PA., DISTRICT 
INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 39 of Text) 
797 
451-584 0-72-51 
TABLE 25-I 
Project 
Amsterdam, Ohio 
Big Run, Pa. 
Bradford, Pa. 
Brookville, Pa. 
Buckhannon, W. Va. 
Burgettstown-Slovan, Pa. 
Butler, Pa. 
Chartiers Creek, Pa. 
Colliers, Pa. 
Eldred, Pa. 
Friendsville, Md. 
Granville, Pa. 
Johnsonburg, Pa. 
Kittanning, Pa. 
Latrobe, Pa. 
Leetonia, Ohio 
Oil City, Pa. 
Olean, N. Y. 
Portage, Pa. 
Portville, N. Y. 
Reynoldsville, Pa. 
Ridgway, Pa. 
Stonewood-Nutter Fort, W. Va. 
Sykesville, Pa. 
Tarentum, Pa. 
Turtle Creek, Pa. 
Washington, Pa. 
Wellsville, Ohio 
Weston, W. Va. 
Wilmore, Pa. 
Dates of Inspection 
November 1969, April 1970 
October 1969, April 1970 
October 1969, May 1970 
October 1969, April 1970 
November 1969 
November 1969, June 1970 
July 1969, May-June 1970 
March 1970 
November 1969, April 1970 
October 1969, May 1970 
June 1970 
September 1969 
October 1969, May 1970 
September 1969, November 1969, May 1970 
July 1969, June 1970 
November 1969 
March 1970, April 1970 
October 1969, May 1970 
September 1969 
October 1969, May 1970 
October 1969, April 1970 
October 1969, April 1970 
September 1969 
November 1969, April 1970 
September 1969, May 1970 
July 1969, May 1970 
September 1969, March 1970 
November 1969, March 1970 
September 1969 
November 1969

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 40 of Text) 
Cost to June 30, 1970 
For Last 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Adena, Ohio2 
Allegany, N.Y., unit I (Allegheny 
River) 
Allegany, N.Y., unit II (Five Mile 
Creek Area) 
Amsterdam, Ohio4 ' 6 
Bellaire, Ohio2 
Big Run, Pa.4, 6 
Brackenridge, Tarentum, and 
Natrona, Pa. 
Bradford, Pa.4 
Brilliant, Ohiol 
Brockway, Pa. 1 
Brookville, Pa.4 
Buckhannon, W. Va.3 
Burgettstown, Pa. 4 ' 6 
Butler, Pa.4 
Clarington, Ohio1 
Coraopolis, Pa.1 
Dillonvale, Ohio2 
Eagle Creek Reservoir, Ohio 1 
Empire and Stratton, Ohio 
Follansbee, W. Va.1 
Freeport, Pa.1 
Friendsville, Md.4 '6 
Granville, Pa.4, 6 
Industry, Pa.1 
Johnsonburg, Pa.4 
Kittanning, Pa., part 14 
Kittanning, Pa., part II' 
Lake Chautauqua and Chadakoin River, 
N.Y.1 ' 7 
Latrobe, Pa.4 
Latrobe, Pa.4 
Leetonia, Ohio4 '6 
Leetsdale, Pa.1 
Martins Ferry, Ohio1 
McKees Rocks, Pa.1 
Mingo Junction, Ohio 1 
Moundsville, W. Va.1 
Neville Island, Pa. 1 
New Cumberland, W. Va.1 
New Kensington and Parnassus, Pa.2 
Oakdale, Pa.6 
Oil City, Pa.4 ,6 
Olean, N.Y.4 
Pittsburgh, Pa. (Golden Triangle)1 
$ 13,452 $ - 
4,100 
1964 
1965 
1962 
1963 
1970 
1958 
1949 
1956 
1951 
1970 
1941 
1954 
2,866 
183,072 
17,759 
364,208 
7,601,763 
194 
964,976 
37,488 
83,129 
1,556,181 
16,884 
100,000 
33,031 
41,529 
75,908 
674,664 
130,317 
190,722 
207,659 
2,556,652 
89,299 
25,164 
14,127 
43,595 
3,217,531 
798 
TABLE 25-J

PITTSBURGH, PA., DISTRICT 
TABLE 25-J (Continued) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 40 of Text) 
Cost to June 30, 1970 
For Last 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Pittsburgh, Pa. (North Side)1 $ - $ - 
Pittsburgh, Pa. (The Strip) 1 
Portage, Pa.4 '6 1965 150,386 
Portville, N.Y.4 1954 2,070,484 
Powhatan Point, Ohio 1 
Proctor, W. Va. 1 
Redbank Creek Reservoir, Pa.1 - 156,337 
Reynoldsville, Pa.4 1959 385,494 
Ridgway, Pa.4 1964 628,888 
Rochester, Pa. 1 
Rouseville, Pa.6 - 1,642 
Slovan, Pa.4 '6 - 57,811 
Smith Ferry, Pa.1 
St. Marys, Pa.1 - 13,529 
Sykesville, Pa.4 '6 - 184,246 
Tarentum, Pa. 4 '6 1964 136,591 
Uniontown, Pa.2 1956 
Wallace, W. Va.6 - 11,035 
Warwood, W. Va. 1 
Washington, Pa.4 1964 789,093 
Wellsburg, W. Va. 1 - 6,387 
Wellsville, Ohio, Sec. 14 1956 483,910 
Wellsville, Ohio, Sec. II4 1956 157,633 
West Bridgewater, Pa.1 
Wheeling, W. Va. (North Wheeling) 1 
Wheeling, W. Va. (Wheeling Island) - 21,700 
Wheeling-Benwood, W. Va.1 1954 270,095 
Wilcox, Pa.5 - 16,761 
Wilmore, Pa.4 '6 96,853 
Woodlands, W. Va. 1 
1. Inactive. 
2. To be restudied. 
3. Local interests failed to meet requirements of cooperation, 
authority for project expired Feb. 20, 1951. 
4. Completed. 
5. Local interests failed to meet requirements of cooperation, 
authority for project expired Mar. 5, 1955. 
6. Authorized by Chief of Engineers. 
7. Local interests failed to meet requirements of local 
cooperation, authority for project expired Mar. 2, 1970. 
799

TABLE 25-K 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
(See Section 41 of Text) 
Study Identification Fiscal Year Costs 
Cherry Valley Run at Washingtonville, Ohio (detailed project report) $ 1,196 
East End Run, East Liverpool, Ohio (reconnaissance report) 3,559 
Limestone Run, Wilsonburg, W. Va. (detailed project report 12,678 
Tygart Valley River at Belington, W. Va. (reconnaissance report) 2,500 
Yankee Run, Brookfield Township, Ohio (reconnaissance report) 
COMPLETED FLOOD PLAIN STUDIES 
TABLE 25-L (See Section 43 of Text) 
Location Requesting Agency Date Completed Federal Cost 
Neshannock Creek, Lawrence Lawrence County Regional Planning April 1964 
County, Pa., Pt. 1 Commission, New Castle, Pa. 
Shenango and Mahoning Rivers, Lawrence County Regional Planning February 1965 
Lawrence County, Pa., Pt. 2 Commission, New Castle, Pa. 
Mosquito Creek, Trumbull Dept. of Natural Resources, State of Ohio November 1966 24,800 
County, Ohio and Trumbull County Planning and Redevelopment 
Commission 
Sewickley Creek and Jacks Run, Hempfield Township Planning Commission August 1967 22,400 
Hempfield Township, Pa. 
Hare and Bare Creeks, Corry, Pa. City of Corry, Pa. February 1968 15,471 
Pigeon Creek, Washington County, Bentleyville-Fallowfield Regional Planning May 1968 23,600 
Pa. Commission 
Salamanca, N. Y. City of Salamanca and Division of Water December 1968 19,997 
Resources, State of New York 
French and Cussewago Creeks, City of Meadville and Crawford County September 1969 25,025 
Meadville, Pa. Planning Commission 
Allegheny River and Olean Creek, City of Olean and Division of Water Re- April 1970 19,989 
Olean, N. Y. sources, State of New York 
Allegheny River and Five Mile City of Allegany and Division of Water Re- April 1970 10,014 
Creek, Allegany, N. Y. sources, State of New York 
Brush Creek, North Huntingdon North Huntingdon Township Planning May 1970 20,000 
Township, Pa. Commission 
800

ST. PAUL, MINN., DISTRICT* 
This district comprises western Wisconsin, westerly 
portion of Upper Peninsula of Michigan, major portion 
of Minnesota, northern and eastern North Dakota, and 
small portions of northeastern South Dakota and 
northern and northeastern Iowa embracing drainage 
basins of Mississippi River and tributaries from its 
source to mile 614 above mouth of Ohio River; Red 
River of the North and tributaries; those streams north 
of Missouri River Basin in North Dakota; U.S. waters 
of Lake of the Woods and its tributaries; and U.S. 
waters at Lake Superior and its tributary basin west of 
Au Train Bay, including Isle Royale in Lake Superior. 
That section of Mississippi River above mile 614 is 
included in report on Mississippi River between 
Missouri River and Minneapolis, Minn. 
IMPROVEMENTS 
Navigation Page 
1. Big Bay Harbor, Mich. ........................ 802 
2. Cornucopia Harbor, Wis. ..................... 802 
3. Duluth-Superior Harbor, Minn. and 
W is. ........................ ............ ................. 802 
4. Grand Traverse Bay Harbor, Mich. ..... 803 
5. Keweenaw Waterway, Mich .................... 803 
6. Knife River Harbor, Minn. ................... 803 
7. Lac La Belle Harbor, Mich. ............... 804 
8. Minnesota River, Minn. ....................... 804 
9. Mississippi River between Missouri 
River and Minneapolis, Minn ........ 804 
10. Ontonagon Harbor, Mich. ................... 804 
11. Reservoirs at Headwaters of Mississippi 
River ........................................ 805 
12. St. Croix River, Minn. & Wis. ............. 805 
13. Saxon Harbor, Wis. .............................. 806 
14. Two Harbors, Minn. ............................. 806 
15. Reconnaissance and condition surveys .. 806 
16. Other authorized navigation projects .... 806 
Flood Control 
17. Big Stone Lake and Whetstone River, 
Minn. and S. Dak. .............................. 
18. Eau Galle River, Wis ......................... 
19. Guttenberg, Iowa .................................... 
20. Homme Reservoir and Dam, N. Dak.. 
21. Lac qui Parle, Minnesota River, Minn. 
806 
807 
807 
808 
808 
Flood Control (cont.) Page 
22. La Farge Lake and channel 
improvement, W is. ................................ 808 
23. Lake Ashtabula and Baldhill Dam, 
Sheyenne River, N. Dak. ........... 809 
24. Lake Traverse and Bois de Sioux 
River, S. Dak., and Minn. ................. 809 
25. Mankato and North Mankato, Minn.. 809 
26. Red Lake River, Minn., including 
Clearwater River, Minn. ........... 810 
27. Red River of the North drainage 
basin, Minn., S. Dak., & N. Dak. ... 810 
28. Roseau River, Minn .......................... 811 
29. Rushford, M inn. ....................................... 811 
30. St. Paul and South St. Paul, Minn. .... 811 
31. Warroad River & Bull Dog Creek, 
M inn. .................... ....................... 812 
32. Zumbro River, Minn. .............................. 812 
33. Inspection of completed flood control 
projects ........................................ 812' 
34. Other authorized flood control projects 812 
35. Flood control work under special 
authorization ........................................ 813 
36. 
37. 
38. 
General Investigations 
Surveys ................................................ 813 
Collection and study of basic data ....... 813 
Research and development .................. 813 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
801

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
NAVIGATION 
1. BIG BAY HARBOR, MICH. 
Location. On south shore of Lake Superior 33 miles 
northwesterly from Marquette, Mich., and 38 miles 
easterly from Portage entry to Keweenaw Waterway. 
(See Survey Chart 94.) 
Existing project. Provides for two converging piers 
extending from shore, an entrance channel between 
piers and a rectangular harbor basin. Project depths 
are 12 feet in entrance channel and 10 feet in harbor 
basin. For details see page 1009 of Annual Report for 
1965 and page 1261 of Annual Report for 1962. 
Existing project was authorized by 1945 River and 
Harbor Act (H. Doc. 446, 78th Cong., 2d sess., 
containing latest published map). 
Local cooperation. Fully complied with. 
Terminal facilities. A State-owned launching ramp 
and dock for small craft. 
Operations and results during fiscal year. Maintenance: 
Condition surveys were performed at cost of $312. 
Breakwater repairs by contract were 100% complete at 
the end of the year and costs were $49,998. Administrative 
costs were $4,750. 
Condition at end of fiscal year. Project was completed in 
June 1961 except for protection at inner end of east 
breakwater, completed in November 1961. Breakwaters 
are being repaired. Controlling depths at end of 
fiscal year were about 8 feet in lake approach, 10 feet in 
entrance channel and 10 feet in basin. 
2. CORNUCOPIA HARBOR, WIS. 
Location. At mouth of Siskiwit River on south shore of 
Lake Superior, 49 miles east from Duluth, Minn. (See 
Lake Survey Chart 96). 
Existing project. Provides for an entrance channel 
between piers; an irregular-shaped turning basin; two 
inner channels; and reconstruction and Federal 
maintenance of entrance piers constructed by local 
interests. Project depths are 10 feet between piers and 8 
feet in turning basin and inner channels. For additional 
details see page 1010 of Annual Report for 
1965. (See table 26-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. About 1,000 linear feet of privately 
owned docking space is available. 
Operations and results during fiscal year. Maintenance: 
Condition surveys were performed at a cost of $508. 
Cranebarge No. 20 removed 5,275 cubic yards of 
material to restore project depths at a cost of $13,492. 
All work by hired labor. 
Condition at end of fiscal year. Work authorized by 
earlier act was completed in 1939, that for later 
modification in July 1958 except for extension of east 
pier, completed in September 1963. Project depths 
were available at the end of the fiscal year. 
3. DULUTH-SUPERIOR HARBOR, MINN. 
AND WIS. 
Location. At extreme western end of Lake Superior. 
Cities of Duluth, Minn., and Superior, Wis., are on 
north and south sides, respectively. (See Lake Survey 
Chart 966.) 
Previous projects. See page 1246 of Annual Report for 
1962. 
Existing project. Provides for rebuilding canal piers at 
Duluth entry, replacement or construction of piers and 
breakwater at Superior entry and dredging approaches 
and channels within harbor, St. Louis Bay, and St. 
Louis River. Channels vary in depth from 32 to 28 feet 
in entrances, are 27 feet deep in iron-ore route 
channels, and are from 20 to 23 feet in inner channels. 
(See table 26-B for authorizing legislation.) 
For details of authorized channel dimensions and 
dimensions of structures, see page 1246 and 1247 of 
Annual Report for 1962 and page 1011 of Annual 
Report for 1965. Estimated cost (1970) for new work is 
$14,484,000. Portion of project for deepening Twentyfirst 
Ave. West Channel is inactive and excluded from 
the foregoing cost. Estimated cost (1967) of this portion 
was $577,000. 
Local cooperation. Fully complied with for active 
portion of project. 
Terminal facilities. There are 113 docks or terminals 
including some 54 major ones all but one privately 
owned. Facilities for handling iron ore, coal, limestone, 
petroleum, steel and scrap iron, cement, general cargo, 
and grain are believed adequate for most existing 
commerce. 
Operations and results during fiscal year. New work: 
Construction engineering was performed by hired 
labor at a cost of $8,339. Maintenance: Condition 
surveys, miscellaneous inspections and reports, harbor 
line surveys, and maintenance of parks and grounds 
cost $83,708. Dipper Dredge Gaillard removed 255,130 
cubic yards of material from shoal areas in the Duluth- 
Superior Harbor during July to October 1969 and May 
and June 1970 at a cost of $409,740. Breakwater 
repairs were accomplished by the Derrickbarge Coleman 
during September to December 1969 and May-June 
1970 at a cost of $265,304. Park, pier, and recreational 
maintenance was performed at a cost of $15,777 
including repair of storm damage to Canal Park 
Grounds. All work was by hired labor. 
Condition at end of fiscal year. Work authorized prior to 
1960 act was completed in June 1956. Under the 1960 
act, work on the outer harbor, included in House 
Document 150, was completed in June 1965. Work on 
the inner harbor, included in House Document 196, 
started in May 1963 was completed in November 1968 
except for the 21st Ave. West channel portion which is 
inactive. Recreation facilities at various locations also 
remain to be completed. Project depths available in 
completed portions of harbor except for scattered 
802

ST. PAUL, MINN., DISTRICT 
shoals in various locations. A storm on December 12, 
1968, severely damaged the Superior Entry South 
rubble mound breakwater and riprap of the inner 
piers. Some repairs remain for completion. Recreation 
facilities at various locations have not been completed. 
The United States owns 34.90 acres of land in fee in 
Minnesota and Wisconsin, of which 2.15 acres are used 
for a vessel yard. Total cost of existing project to June 
30, 1970, was $22,554,952, of which $14,202,213 was 
for new work and $8,352,739 for maintenance. 
4. GRAND TRAVERSE BAY HARBOR, 
MICH. 
Location. At mouth of Traverse River on eastern shore 
of Keweenaw Peninsula about 20 miles northeasterly 
from Portage entry to Keweenaw Waterway. (See Lake 
Survey Chart 94.) 
Existing project. Provides two parallel piers, an 
entrance channel between piers and a harbor basin. 
Project depths are 12 feet between piers and 10 feet in 
basin. Project area extended 200 feet upstream in 1966. 
For additional details see page 1015 of Annual Report 
for 1965. Existing project was authorized by 1945 River 
and Harbor Act (H. Doc. 446, 78th Cong., 2d sess., 
contains latest published map). 
Local cooperation. Fully complied with. Local interests 
furnished easements on 5.1 acres of land. 
Terminal facilities. Several privately owned fishing 
wharves. Facilities are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys were performed at a cost of $974. 
Seventy-five ton of rock placed in Section C of the 
north pier 30 October 1969 at a cost of $563. About 9, 
400 cubic yards of material were dredged by Derrickbarge 
No. 20 to restore project depth at a cost of 
$16,937. Administrative costs were $2,500. All work 
was by hired labor. 
Condition at end of fiscal year. Existing project was 
completed in 1950 except for extension of north pier 
completed in 1964. North breakwater offers unstable 
mooring conditions as a result of a storm. Work on 
design of a proposed 164-foot extension to remedy the 
condition is in progress. Steel cells and piers are in good 
condition. Timber and round wood pile structures are 
deteriorated but still in serviceable condition. Project 
depths were available in the entrance channel and 
harbor basin at the end of the fiscal year. 
5. KEWEENAW WATERWAY, MICH. 
Location. In Lake Superior across Keweenaw Peninsula 
in upper Michigan. The west entrance is 169 
miles east of Duluth, Minn. (See Lake Survey Chart 
944.) 
Existing project. A navigable channel, minimum width 
300 feet, 25 miles long, partially natural and partially 
artificial across Keweenaw Peninsula via Portage 
Lake. For details see page 1121 of Annual Report for 
1963. Completed cost for new work is $5,967,700. 
Portion of project providing for extension of lower 
entrance breakwater and necessary alteration or 
replacement of structures due to deepening channels in 
inactive and excluded from foregoing cost. Estimated 
cost (1957) of this portion was $3,315,000. (See table 
26-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. Six coal docks, a petroleum dock, 
and several general merchandise and miscellaneous 
wharves, all privately owned. Facilities are considered 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys and miscellaneous inspections and 
reports were made by hired labor at a cost of $7,343. 
Minor work on maintenance of recreation facilities was 
done by hired labor at a cost of $4,738. 
Condition at end offiscalyear. Active portion of project is 
complete. Breakwaters are in generally good condition 
except for a weakness occurring in about 300 feet of 
substructure of breakwater at lower entrance, and 
minor repairs needed for stone-covered portions of 
breakwaters at upper entrance. Mooring pier at Lily 
Pond requires repairs to halt movement and permit 
dredging to project depth adjacent thereto. Mooring 
pier at Portage River Harbor of Refuge is in good 
condition. Annual redredging of channels will be 
required indefinitely. Controlling depth is about 25 
feet. 
6. KNIFE RIVER HARBOR, MINN. 
Location. Near mouth of Knife River on north shore 
of Lake Superior, 19 miles northeasterly from Duluth, 
Minn., and 7 miles southwest of Two Harbors, Minn. 
(See Survey Chart 96.) 
Existing project. Provides for an entrance channel, of 
varying width, 10 feet deep from that depth in Lake 
Superior; and inner straight channel 8 feet deep, 50 
feet wide, and 600 feet long with a spending beach at its 
inner end having a radius of 150 feet; northerly and 
southwesterly side channels 8 feet deep, 50 feet wide, 
and 150 and 250 feet long, respectively; and a 
breakwater 245 feet long on south side of entrance 
including a timber crib. For additional details see page 
1110 of Annual Report for 1963. (See table 26-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. Local interests 
furnished easements on 15.08 acres of land. 
Terminal facilities. Local interests have installed pileand-
timber docks on both sides of straight channel. 
Operations and results during fiscal year. Maintenance: 
Condition surveys were performed at a cost of $735. 
About 3,020 cubic yards of material were removed by 
Government cranebarge No. 20 and hired labor for 
$13,265 to restore project depths. 
803

REPORT'OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end of fiscal year. Project was completed in 
June 1958. Breakwater and spending beach are in good 
condition. At end of fiscal year, controlling depths were 
10 feet in lake approach, 8 feet in channel between 
revetments, and 8 feet in side channels. 
7. LAC LA BELLE HARBOR, MICH. 
Location. On south shore of Lake Superior on eastern 
shore of Keweenaw Peninsula 41 miles northeasterly 
from Portage entry to Keweenaw Waterway. Lac La 
Belle, Bete Grise Bay, and Mendota Ship Canal 
combine to form the harbor. (See Survey Chart 94.) 
Existing project. Provides for construction of two 
parallel piers at the entrance having lengths of 584 and 
682 feet for north and south piers, respectively; for an 
entrance channel between the piers 50 feet wide and 12 
feet deep about 820 feet long with a flared approach; 
and for an inner canal 50 feet wide and 10 feet deep 
about 730 feet long. For additional details see page 
1039 Annual Report for 1964. Existing project was 
authorized by River and Harbor Act of March 2, 1945. 
(H. Doc. 446, 78th Cong., 2d sess., which contains latest 
published map.) 
Local cooperation. Fully complied with. 
Terminal facilities. Several small, privately owned 
wharves are available in the harbor for use of small 
craft engaged in fishing and recreational activities. 
Operations and results during fiscal year. Maintenance: 
Condition surveys were performed at a cost of $297. 
About 11,175 cubic yards of material were removed by 
Government cranebarge No. 20 and hired labor at a 
cost of $14,449. On November 28, 1969, 100 ton of rock 
was placed at the inner end of the south pier at a cost of 
$551. 
Condition at end of fiscal year. Project was completed in 
January 1960. Project depths are available. 
8. MINNESOTA RIVER, MINN. 
Location. Rises in Big Stone Lake, Minn. and S. Dak., 
and flows southeasterly about 224 miles to Mankato, 
Minn., thence northeasterly about 106 miles to join the 
Mississippi River opposite St. Paul, Minn. (For general 
location see Geological Survey map of Minnesota.) 
Previous projects. For details see page 1890 of Annual 
Report for 1915, and page 1105 of Annual Report for 
1938. 
Existing project. Provides 9-foot depth below flat pool 
level of Mississippi River lock and dam 2 from mouth 
to mile 14.7, one-half mile above the railway bridge at 
Savage, Minn., and 4-foot depth from mile 14.7 to 25.6 
at Shakopee, Minn. For details see page 1018 of 
Annual Report for 1965. (See table 26-B authorizing 
legislation.) 
Local cooperation. Fully complied with. See also page 
1074 of Annual Report for 1967. 
Terminal facilities. There are privately owned terminals 
at miles 9, 13.1, 14.5 and two at mile 14.7. 
Operations and results during fiscal year. New work: 
Engineering for channel improvement was carried on 
by hired labor at a cost of $2,414. Surveys and layouts 
were completed at a cost of $20,787. Administrative 
costs were $233. Maintenance: Soundings and surveys 
were taken by hired labor at a cost of $3,949. Dredging 
operations were performed by Derrickbarge 767 in 
August and September 1970 at a cost of $102,765. 
Clearing and snagging was performed by hired labor 
during November 1969 and June 1970 at a cost of $7, 
895. Administrative costs amounted to $11,956. 
Condition at end of fiscal year. Work on project for 4-foot 
depth was completed in 1931. The United States owns 
10 acres of land in fee 2 miles east of Savage, Minn. 
Rights-of-entry have been obtained over 123.08 acres 
of land over which perpetual easements will be 
conveyed by local interests. 46.20 acres have been 
transferred from the Department of the Army and 
Department of the Air Force to the project. Navigation 
from mouth to Shakopee was practicable for drafts not 
in excess of 3 feet. A contract for work under 1958 
authorization for a 9-foot channel started in May 1966 
was terminated in January 1967 when 56 percent 
complete. A new contract was awarded and is 
completed. Total costs for existing project to June 30, 
1970, were $2,398,271, of which $1,940,180 was for new 
work and $458,091 for maintenance. In addition, cost 
from contributed funds was $139,764 for dredging to 9- 
foot depth under provisions of section 4, River and 
Harbor Act of 1915, and $219,438 for work done for the 
State of Minnesota relative to the modification of 
project. 
9. MISSISSIPPI RIVER BETWEEN 
MISSOURI RIVER AND 
MINNEAPOLIS, MINN. 
For report on this improvement see chapter on 
Mississippi River between Missouri River and Minneapolis, 
Minnesota. 
10. ONTONAGON HARBOR, MICH. 
Location. On South shore of Lake Superior. It consists 
of improvement of mouth of Ontonagon River. (See 
Lake Survey Chart 95.) 
Previous project. For details see page 1931 of Annual 
Report of 1915, and page 1406 of Annual Report for 
1938. 
Existing project. Provides for approach channel 17 feet 
deep, a channel between piers with 17- and 15-foot 
depths, an inner basin 15 feet deep, and maintenance 
of channels, basin, and entrance piers. Completed 
project cost $19,619. See page 1100 of Annual Report 
for 1966 for details. A modification authorized by 1962 
River and Harbor Act provides for increasing depths of 
channels, construction of an inner basin and a 
sedimentation basin. This portion of project is inactive. 
Estimated cost (1965) of this work is $6,040,000. (See 
table 26-B authorizing legislation.) 
804

ST. PAUL, MINN., DISTRICT 
Local cooperation. None required for earlier authorization. 
See page 1020 of Annual Report for 1965 
requirements of 1962 Act. 
Terminal facilities. There are no publicly owned 
wharves. There are three coal wharves, an oil receiving 
facility, and few small fish wharves. Terminal facilities 
are considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys were made for $1,036. Replacement 
of timber fender to west pier was accomplished in 
February and March 1970 by hired labor at a cost of 
$19,544. 
Condition at end of fiscal year. Project under earlier act 
was completed in 1938. Both east and west breakwaters 
were damaged by fall and spring storms and are in 
need of repair. Controlling depths are 16 feet in lake 
approach channel, 14 feet in channel between piers, 
and 12 feet harbor basin. Work under the 1962 act has 
not been done. Total costs to June 30, 1970, for existing 
project were $1,975,428 of which $47,101 was for new 
work and $1,928,327 for maintenance. 
11. RESERVOIRS AT HEADWATERS OF 
MISSISSIPPI RIVER 
Location. Reservoirs are on the Mississippi River and 
several of its tributaries in Itasca, Beltrami, Hubbard, 
Aitkin, Cass, and Crow Wing Counties, Minn. (See 
table 26-C on reservoirs.) 
Previous project. For details see page 1888 of Annual 
Report for 1915, and page 1098 of Annual Report for 
1938. 
Existing project. Provides for reconstruction from 
timber to concrete at Winnibigoshish, Leech Lake, 
Pokegama, Sandy Lake, and Pine River dams, and 
construction of a concrete dam at Gull Lake. Pokegama 
was built on bedrock and the others on pile 
foundations. A portion of Leech Lake Dam from piers 
26 to 39 was replaced with an earth fill. Constructed 
three dikes at Winnibigoshish, 4 at Pokegama, 2 at 
Sandy Lake and 16 at Pine River. Sandy Lake Dam 
includes a lock 160 feet long, 30 feet wide, with a 
maximum lift of 9.5 feet and a depth of 2.5 feet on 
lower sill at low water which was converted to use as a 
spillway. Estimated cost (1970) of new work for existing 
project is $3,160,000. (See table 26-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. None. 
Operations and results during fiscal year. New work: 
Engineering for recreational facilities was carried on by 
hired labor at a cost of $19,183. Archeological 
investigations at Gull Lake were completed by contract 
at a cost of $6,673. Maintenance: Reservoirs were 
operated as required and miscellaneous inspections, 
repairs and reports were made by hired labor, at a cost 
of $271,633. Cost of engineering for modernization of 
Gull Lake Dam was $5,725. A contract for installation 
of slide gates at Leech Lake was completed in 
December 1969, except for minor items which were 
completed in January and February 1970, all at a cost 
of $68,550. Three other minor contracts were performed 
at a total cost of $16,240. 
Condition at end of fiscal year. Existing project was 
completed in 1937. Flowage rights were acquired on all 
lands affected by construction, maintenance, and 
operation of reservoirs. A total of 1,806 acres in fee and 
easements on 296,304 acres are owned by the United 
States. Structures are in fair condition. Rehabilitation 
of apron at Winnibigoshish was completed in August 
1965. Various recreation facilities were constructed at 
Sandy, Pine, Gull, Leech, and Pokegama. (See table 
26-C for capacities and costs by reservoir.) 
12. ST. CROIX RIVER, MINN. & WIS. 
Location. From source in northwestern Wisconsin 
flows southwesterly and then southerly about 164 miles 
to Mississippi River at Prescott, Wis., about 41.7 miles 
below lower Burlington Northern Railway bridge, 
Minneapolis, Minn. For its greater part, forms boundary 
between Minnesota and Wisconsin. (See Geological 
Survey map of Minnesota.) 
Existing project. Provides for maintenance of a 
channel, 9 feet in depth and of suitable width from 
mouth to Stillwater, Minn., 24.5 miles, created by 
improvement of upper Mississippi River; a channel 3 
feet deep at mean low water between Stillwater and 
Taylors Falls (27.3 miles); improvement of harbor and 
waterfront at Stillwater; and a small-boat harbor at 
Hudson, Wis. Estimated (1970) Federal cost of new 
work is $397,400. Latest authorization (1954) for 
maintenance work on reach between Stillwater and 
Taylors Falls is limited to an expenditure not exceeding 
$5,000 per year. (See table 26-B for authorizing 
legislation.) 
Local cooperation. Fully complied with for completed 
portion. For Hudson Harbor, local interests must 
provide lands and rights-of-way for construction of the 
project, hold the United States free from damages, 
provide and maintain parking and storage areas, 
mooring facilities, utilities, public landing, and supply 
facilities open to all on equal terms, and establish a 
public body to regulate and develop the harbor. 
Terminal facilities. At Stillwater there is a concrete 
paved levee and a piling-and-timber trestle wharf on 
right bank. At other points along river, landing may be 
made on banks. Facilities are considered adequate for 
existing commerce. 
Operations and results during fiscal year. Maintenance: 
Soundings and surveys were taken by hired labor at a 
cost of $2,362. Clearing and snagging operations were 
performed during May 1970 at a cost of $7,638. 
Conditions at end of fiscal year. All new work was 
completed in 1930, except subsequently authorized 
harbor at Hudson. The United States owns 2.75 acres 
of land in fee at Taylors Falls and has easements over 
805

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
7.57 acres of land at Bayport, Minn. Extension to 
provide a 9-foot channel from mouth to Stillwater was 
completed August 12, 1938 when full pool at dam 3 of 
Mississippi River canalization project was reached. 
Minimum draft from Stillwater to Taylors Falls is 
about 1 foot at extreme low water, and from mouth to 
Stillwater, 9 feet. 
13. SAXON HARBOR, WIS. 
Location. On south shore of Lake Superior in 
Wisconsin at mouth of Oronto Creek, 27 miles 
southeast of harbor at Bayfield, Wis., and 21 miles 
westerly of harbor at Black River, Mich. It is also 99 
miles east of Duluth-Superior Harbor and 60 miles 
west of Ontonagon Harbor, Mich. (See Lake Survey 
Chart 96.) 
Previous project. For details see page 1254 of Annual 
Report for 1962. 
Existing project. Provides for east and west breakwaters, 
an outer channel 10 feet deep, an inner basin 
and side channel 8 feet deep, and diversion of Oronto 
Creek to Parkers Creek by three short reaches of 
channel excavation and a levee. For detailed dimensions 
of features see page 1025 of Annual Report 
for 1965. Existing project was authorized by 1958 River 
and Harbor Act (H. Doc. 169, 85th Cong., 1st sess., 
contains latest published map). 
Local cooperation. Fully complied with. 
Terminal facilities. One wharf 300 feet long on east side 
of present harbor basin constructed by local interests. 
Operations and results during fiscal year. Maintenance: 
Reinforcement at the west breakwater with a channel 
wale was accomplished by hired labor at a cost of $9, 
000. Condition surveys were made at a cost of $604. 
Condition at end of fiscal year. Harbor improvements 
were completed in November 1965 except for minor 
work. The project was fully completed in March 1968. 
Controlling depths are 8 feet in lake approach, 9.8 feet 
in channel between piers, and 8 feet in inner basin and 
side channel. 
14. TWO HARBORS, MINN. 
Location. Harbor is on north shore of Lake Superior, 
27 miles northeasterly from Duluth, Minn. (See Lake 
Survey Chart 96.) 
Existing project. Narrowing natural entrance by 
construction of two breakwaters, 1,628 and 900 feet 
long, from eastern and western points of bay, respectively; 
and dredging a maneuvering area on north 
side of harbor to 28 and 30 feet deep. A walkway on 
east breakwater is provided for public recreational use. 
For details see page 1026 of Annual Report for 1965. 
Areas along easterly and northerly edges of channel 
have not been fully deepened. This portion of project is 
inactive and excluded from total cost. Local interests 
have indicated a need for additional study to determine 
the advisability of further harbor improvements. 
Estimated cost (1963) of this portion was $45,000. (See 
table 26-B for authorizing legislation. 
Local cooperation. Fully complied with. A resolution 
dated April 15, 1969 from the city council of Two 
Harbors requested a review of reports on Two Harbors 
to determine whether any further improvements are 
advisable at this time. 
Terminal facilities. No publicly owned wharves. Three 
ore docks, tug wharf, an unused coal dock, and 
merchandise wharf are privately owned. Facilities 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Engineering for repairs of the east breakwater and the 
public use walkway damaged by ice during the winter 
1967-1968 was accomplished by hired labor at a cost of 
$34,490. 
Condition at end of fiscal year. Work authorized prior to 
1960 act was completed in 1950. The timber superstructure 
of the east breakwater above L.W.D. 
which has become badly deteriorated since its original 
construction in 1948 was severely damaged in a N.E. 
storm on December 12, 1968. Repairs have not been 
made. The public-use walkway was completed in June 
1965. Work on harbor deepening project authorized in 
1960 is complete except for inactive portion. Full 
project depths are available to within about 100 feet of 
east project line. 
15. RECONNAISSANCE AND CONDITION 
SURVEYS 
See table 26-D. 
16. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 26-E.
FLOOD CONTROL 
17. BIG STONE LAKE AND WHETSTONE 
RIVER, MINN. AND S. DAK. 
Location. On Minnesota River near Ortonville and 
Odessa, Minn., and Big Stone City, S. Dak., at the 
outlet of Big Stone Lake and in Big Stone and Lac qui 
Parle Counties, Minn., and Grant County, S. Dak. 
(For general location, see Geological Survey map of 
Minnesota.) 
Existing project. Provides for a dam and reservoir on 
Minnesota River above U.S. Highway 75, modifications 
of Big Stone Lake outlet dam and silt barrier, 
bank stabilization along lower 6 miles of Whetstone 
River, channel improvement on Minnesota River for 3 
miles below outlet control dam at Big Stone Lake along 
with necessary relocations and acquisition of lands. 
These improvements would be made for wildlife 
conservation and development, flood control and 
recreation. Authorization provides that before starting 
construction of dam and reservoir, the Chief of 
806

ST. PAUL, MINN., DISTRICT 
Engineers and Director, Fish and Wildlife Service, 
shall prepare a mutually satisfactory general plan for 
administering use of waters, land or interest therein for 
wildlife so as to provide best use for all project purposes, 
and also provides that upstream work not be undertaken 
until construction has been started on the 
dam and reservoir above Highway 75. Estimated 
Federal cost (1970) for new work is $6,300,000 and 
$104,000 to be contributed by local interests. Project 
was authorized by 1965 Flood Control Act (H. Doc. 
579, 87th Cong., 2d sess., contains latest map, and H. 
Doc. 193, 88th Cong., 2d sess.) 
Local cooperation. See Annual Report for 1968 for 
requirements. The project requires sponsorship from 
both the States of Minnesota and South Dakota. 
Formal resolution of assurances adopted by the Upper 
Minnesota River Watershed District for Minnesota on 
May 20, 1969 was furnished the St. Paul District on 
June 10, 1969 and accepted by the District Engineer on 
November 3, 1969. Formal resolution of assurances 
adopted by the East Dakota Conservancy Sub-District 
for South Dakota on October 23, 1969 was furnished on 
November 18, 1969 and accepted by the District 
Engineer on November 19, 1969. 
Operations and results during fiscal year. Engineering for 
detailed plans was continued at a cost of $42,856. The 
land acquisition program was continued at a cost of 
$256,443. The first land payment was made on 
November 28, 1969 and 10 tracts have been purchased. 
Condition at end of fiscal year. Preparation of detailed 
plans was continued. Surveys for land lines are 
complete, and the land acquisition program is 8.4 
percent complete. An agreement between the Secretary 
of the Army and Secretary of Interior for 
administering the use of waters, land, or interests 
therein has been consummated. 
18. EAU GALLE RIVER, WIS. 
Location. At and in vicinity of Spring Valley, Wis., on 
Eau Galle River 30 miles above its mouth at Chippewa 
River, and its tributary, Mines Creek, which flows 
through the village. Spring Valley is about 45 miles 
east of St. Paul, Minn., and 36 miles west of Eau Claire, 
Wis. (See Geological Survey map for Wisconsin for 
general location.) 
Existing project. Authorized plan of improvement as 
modified by further studies includes a retarding dam 
and reservoir on Eau Galle River immediately upstream 
from Spring Valley, and remedial works on 
Mines Creek including channel enlargement, a low 
levee and a drop structure. Project provides for earth 
and rockfill dam, and uncontrolled outlet and an 
uncontrolled spillway emerging above Mines Creek. 
See page 1030 of Annual Report for 1965 for further 
details. Proposed improvements on Burghardt Creek 
were eliminated. Improvements would provide complete 
protection near Spring Valley for standard 
project flood, and below that point in decreasing value 
in proportion to distance from reservoir. Permanent 
conservation pool will serve a local need for a 
recreational area. Estimated Federal cost (1970) for 
new work is $8,220,000. Project was authorized by 1958 
Flood Control Act (S. Doc. 52, 84th Cong., 1st sess., 
contains latest published map). 
Local cooperation. Fully complied with. See p. 1083 of 
Annual Report for 1967. 
Operations and results during fiscal year. New work: 
Construction engineering was accomplished at a cost of 
$86,723 by hired labor. Contract payments pertaining 
to the claim for construction of dam, spillway, and 
channel were made at a cost of $586,372. Miscellaneous 
construction was accomplished by hired 
labor at a cost of $3,729. A contract was initiated in 
May 1970 for seepage control at the toe of the dam and 
for a service road. Contractors earnings amounted to 
$5,000. Maintenance: Structure was operated and 
inspections and evaluations were performed at a cost of 
$14,354. 
Condition at end of fiscal year. Mines Creek improvements 
were substantially completed in 1964; 
minor work was accomplished in 1966. A contract for 
dam, spillway, and discharge channel, started July 1, 
1965, was completed in October 1968. Remedial work 
for seepage control and construction of recreation 
facilities remain to complete the project. 
19. GUTTENBERG, IOWA 
Location. In northeastern Iowa on right bank of 
Mississippi River about 615 miles above mouth of Ohio 
River. (See Geological Survey map of Iowa for general 
location.) 
Existing project. As modified because of 1965 record 
flood, the project provides for levees of about 7,400 feet 
and 2,650 feet long, respectively, at both north and 
south extremities of Guttenberg, raising railroad at 
intersections with levees, construction of pumping 
systems at each levee, reservation of ponding areas for 
temporary storage of seepage and interior drainage. 
Levees together with intervening reach of high ground 
along riverbank will protect essentially all of city of 
Guttenberg from floods with an expected frequency of 
recurrence of once in 200 years. Estimated Federal cost 
(1970) for new work is $2,930,000. Project was 
authorized by 1962 Flood Control Act (H. Doc. 286, 
87th Cong., 2d sess., contains latest published map). 
Local cooperation. See p. 1085 of Annual Report for 
1967 for requirements. Local interests were requested 
to furnish assurances on December 7, 1967. A 
resolution of assurances was received on December 20, 
1967. However, on May 11, 1968, the city of Guttenberg 
indicated that they were not able to finance the 
project at the time. Improvement of the city's financial 
situation was undertaken through property reevaluations. 
By letter dated October 28, 1969 the city 
council advised that they had started the necessary 
807

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
procedures for a bond issue. Assurances of local 
cooperation were accepted on January 5, 1970. 
Operations and results during fiscal year. Preconstruction 
planning was continued at a cost of $119,281. Design 
memorandum and Supplements Nos. 1, 2, and 3 have 
been prepared. 
Condition at end offiscalyear. Preconstruction planning 
is in progress. Completion of plans and specifications 
and construction of improvements remain to complete 
the project. 
20. HOMME RESERVOIR AND DAM, 
N. DAK. 
Location. Dam is on South Branch of Park River, 
about 4 miles upstream from Park River, N. Dak., and 
62.1 miles above mouth of Park River. South, Middle, 
and North Branches, headwater streams of Park River, 
rise in Cavalier County in northeastern North Dakota 
and flow easterly to an almost common confluence near 
Grafton, N. Dak., forming main stream which flows 
easterly 35 miles to join Red River of the North about 
35 miles south of international boundary (For general 
location, see Geological Survey map of North Dakota.) 
Existing project. See page 1285 of Annual Report for 
1962. Project was authorized as Park River Reservoir 
by 1944 Flood Control Act (S. Doc. 194, 78th Cong., 2d 
sess.), and redesignated Homme Reservoir and Dam by 
Public Law 435, 80th Congress, 2d session. Latest 
published map is in project document. Estimated 
Federal Cost (1970) for new work is $1,466,300. 
Local cooperation. Fully complied with. Estimated total 
costs for all requirements of local cooperation under 
terms of project authorization, including required non- 
Federal contributions, are $62,800. In addition, local 
interests contributed $16,220 for construction of a 
water-supply outlet through dam and incurred other 
costs of $19,600. 
Operations and results during fiscal year. New Work: 
Recreational planning was continued by hired labor at 
a cost of $123. Maintenance: Structure was operated 
and minor repairs made by hired labor at a cost of $16, 
666. Detailed investigation of voids under the concrete 
spillway was completed at a cost of $13,344, by hired 
labor. Construction, by contract, was initiated. It is 
estimated that damages of $86,600 were prevented 
during the year by operation of the project. 
Condition at end offiscalyear. Project completed in June 
1956 except for additional recreational facilities which 
have been done intermittently since that time. Construction 
began in April 1948 and major structures 
completed in May 1951. Structures are in good 
condition except for erosion beneath the spillway 
which will require repair. Government has acquired 
399 acres of land in fee and easements over 7.8 acres of 
land for project. An additional 6.3 acres of land have 
been donated for recreational development and 3.75 
acres have been acquired due to bank erosion bordering 
the project. 
21. LAC QUI PARLE, MINNESOTA RIVER, 
MINN. 
Location. Works covered by this project lie along 
Marsh Lake and Lac qui Parle and the Minnesota 
River between head of Marsh Lake and Granite Falls, 
Minn. (For general location, see Geological Survey 
map of Minnesota.) 
Existing project. See page 1291 of Annual Report for 
1962. Estimated cost (1970) to United States for 
completion of project is $959,600, including about 
$379,950 for lands and damages. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Project was operated and minor repairs made to 
structures by Hired Labor at a cost of $40,414. 
Snagging and clearing operations were performed in 
December 1969 and January 1970 at a cost of $16,859. 
An estimated $11,100 in damages were prevented 
during the year by operations of the project. 
Condition at end of fiscal year. Project has been operated 
by the Government since transfer from State of 
Minnesota to the United States in September 1950. 
The United States owns fee title to 516.3 acres of land 
and easements on 19,826.7 acres of land. Special 
easements on 32.8 acres of land and 1.3 acres of land in 
fee were also acquired. In 1957, 60.1 acres were 
withdrawn from public lands for use of the Department 
of the Army. Land acquisition is complete. Construction 
under present plan of improvement was 
started in September 1941 and completed in December 
1951 except for recreational facilities. All structures are 
in good condition. 
22. LA FARGE LAKE AND CHANNEL 
IMPROVEMENT, WIS. 
Location. Rises in Monroe County in southwestern 
Wisconsin and flows south and southwest through 
Vernon, Richland, and Crawford Counties emptying 
into Wisconsin River about 16 miles above junction of 
latter stream with Mississippi River. (For general 
location see Geological Survey map of Wisconsin.) 
Existing project. Provides for a dam and impoundment 
on the Kickapoo River about 1 mile upstream from 
village of La Farge, operated for flood control, fish and 
wildlife conservation, general recreation, and a reduction 
of aggradation downstream from the dam. 
Earth-fill dam 3,960 feet in length will be 103 feet 
above the valley floor with crest elevation of 895.0 feet 
above mean sea level. An uncontrolled spillway with 
crest of 870.5 feet will be about 500 feet long. A 7-footdiameter 
gate-controlled circular conduit with an 
invert elevation of 800.0 feet. About 29 miles of roads 
and highways will be relocated and recreation facilities 
will be provided at 13 sites totaling 1,400 acres of land. 
Supplemental protection will be provided at Soldiers 
Grove and at Gays Mills by means of about 6,000 feet 
of levees at each location. Supplementary channel 
808

ST. PAUL, MINN., DISTRICT 
improvement and interior drainage facilities will be 
constructed at both locations. 
Estimated Federal cost (1970) for new work is $25, 
300,000. Project was authorized by 1962 Flood Control 
Act (H. Doc. 557, 87th Cong., 2d sess., containing latest 
published map.) Work on the La Farge Lake unit may 
be undertaken separately from downstream protection 
works. 
Local cooperation. None required for construction of La 
Farge Lake. See page 1087 of Annual Report for 1967 
for requirements for local protection works. Local 
interests have not been requested to furnish assurances. 
Operations and results during fiscal year. New work: 
Preconstruction planning was continued at a cost of 
$42,904. Land acquisition activities by hired labor cost 
$93,380. Administrative costs amounted to $19,032. 
Payments of $631,520 were made for 49 tracts. 
Condition at end of fiscal year. Construction has not 
started. General and Real Estate design memorandums 
and detailed plans for the La Farge Dam 
and spillway have been completed. The relocations 
design memorandum is in progress. Land acquisition 
program is under way. Land acquis ition negotiations 
began in December 1968 and the first land payment 
was made on 15 January 1969. Payments of $790,503 
have been made for 65 tracts and the land acquisition 
program is 33.7 percent complete. 
23. LAKE ASHTABULA AND BALDHILL 
DAM, SHEYENNE RIVER, N. DAK. 
Location. Baldhill Dam is on Sheyenne River, 16 
miles upstream from Valley City, N. Dak., and about 
271 miles above mouth. Sheyenne River rises in central 
North Dakota and flows 500 miles generally southeast 
to enter Red River of the North about 10 miles north of 
Fargo, N. Dak. (For general location see Geological 
Survey map of North Dakota.) 
Existing project. See page 1287 of Annual Report for 
1962. Estimated Federal cost (1970) of new work is $3, 
191,900. Project was authorized by Flood Control Act 
of 1944 (S. Doc. 193, 78th Cong., 2d sess., contains 
latest published map.) Reservoir above Baldhill Dam 
was designated as Lake Ashtabula by Public Law 772, 
81st Congress, 2d session. 
Local cooperation. See page 1288 of Annual Report for 
1962. Complied with except for construction of Fargo 
diversion dam and ditch for which assurances furnished 
by city of Fargo were approved by Secretary of 
War on June 26, 1947. Necessity for this feature will be 
reviewed. 
Operations and results during fiscal year. New work: 
Engineering for recreational facilities accomplished at 
cost of $4,812 by hired labor. Construction of recreation 
facilities was completed September 1969 at a 
cost of $85,896 by contract. Supervision and administration 
costs were $2,602. Maintenance: Project 
was operated and minor repairs made to structures by 
hired labor at a cost of $92,074. 
Condition at end of fiscal year. Project completed in 
March 1956 except construction of recreational facilities, 
which is being accomplished intermittently. 
United States owns 7,816.5 acres of land in fee and 
easements on 666.2 acres. Construction initiated in 
July 1947 and major features completed in November 
1950. Dam was placed in permanent operation in 
spring of 1951. Structures are in good condition except 
for damage to riprap protection on earth dike caused 
by wave damage. A contract was awarded on June 29, 
1970 to effect repairs to the dike. Slide condition is 
being observed on downstream right bank; however, 
this slide does not affect the structures. 
24. LAKE TRAVERSE AND BOIS DE 
SIOUX RIVER, S. DAK., AND MINN. 
Location. Works covered by this project lie along Lake 
Traverse and Bois de Sioux River between upper end of 
Lake Traverse at Browns Valley, Minn., and mouth of 
Bois de Sioux River at Breckenridge, Minn. Lake 
drains through river to Red River of the North, and the 
two waters form a portion of boundary between State of 
Minnesota and States of North and South Dakota. (For 
general location, see Geological Survey map of 
Minnesota.) 
Existing project. See page 1289 of Annual Report for 
1962. Estimated (1970) cost of project is $1,340,800. 
Existing project was authorized by Flood Control Act 
of June 22, 1936. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Project was operated and minor repairs made to 
structures by hired labor at a cost of $43,294. It is 
estimated that damages of $51,800 were prevented 
during the year by operation of the project. 
Conditions at end of fiscal year. Existing project was 
completed in June 1948, except for minor recreation 
facilities. Fee title to 1,144.13 acres and easements on 6, 
155.35 acres of land have been required. White Rock 
Dam and Reservation control structures are in 
operation, and structures and appurtenances are in 
good condition. Remedial work for repair of apron at 
White Rock Dam was completed in November 1968. 
Roadways across structures are open to public travel. 
25. MANKATO AND NORTH MANKATO, 
MINN. 
Location. Along Minnesota River between miles 103.5 
and 109.5 near Mankato, North Mankato, and Le 
Hillier, in south central Minnesota. (For general 
location see Geological Survey map of Minnesota.) 
Existing project. As modified as a result of severe 1965 
flood, provides for protection of communities of 
Mankato, North Mankato, and Le Hillier by means of 
levees and flood walls with pumping plants and interior 
drainage facilities. See page 1090 of Annual Report for 
1967 for further details. Estimated Federal cost (1970) 
809

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
for new work is $14,500,000. Project was authorized by 
1958 Flood Control Act (H. Doc. 437, 84th Cong., 2d 
sess., contains latest published map.) Project was 
modified by 1965 Flood Control Act. 
Local cooperation. Local interests must furnish lands 
and rights-of-way for construction of project, hold the 
United States free from damages, maintain and 
operate works after completion, make necessary 
changes to utilities, highways, and bridges including 
approaches, prevent encroachment on ponding areas 
and existing river channels, use the three pumps in 
existing Indian Creek pumping station, remove remaining 
portion of Blue Earth River dam, and 
contribute in cash or equivalent construction work 1.9 
percent of gross Federal first cost, presently estimated 
to be $275,000. Section 207, 1965 Flood Control Act, 
modified requirements of local cooperation to credit 
local interests against the required contribution for 
work done by them during 1965 high water period. 
Local interests have expended about $315,000 in such 
work. Resolutions agreeing to provide formal assurances 
of local cooperation, when requested, were 
passed by the city council of North Mankato, Mankato, 
and South Bend Township (Le Hillier), respectively, 
on November 12, 1968. 
Operations and results during fiscal year. Plans and 
specifications were prepared for construction of a 
segment of work at the upstream end of Stage I in 
North Mankato. Bids on this segment opened on June 
23, 1970 were considered excessive and therefore 
rejected. The work will be readvertised July 2, 1970. 
Detailed design for Stage I of the North Mankato unit 
was completed. Work was done by hired labor for new 
work at a cost of $220,843. 
Condition at end of fiscal year. Work on detailed plans, 
virtually completed, was suspended in 1962 due to lack 
of local cooperation. Following the record flood in 
1965, work was resumed. General Design Memorandum 
and supplements Nos. 1 and 2 are completed. 
Supplement No. 2 provides for construction of local 
protective works in four stages. Construction has not 
started. Preconstruction planning is in progress. 
26. RED LAKE RIVER, MINN., 
INCLUDING CLEARWATER RIVER, 
MINN. 
Location. Works covered by this project lie along 
upper reach of Red Lake River and also along 
Clearwater River, a tributary of Red Lake River, 
between a point near Plummer, Minn., and a point just 
above mouth of Ruffy Brook. Red Lake River, 
principal tributary of Red River of the North, has its 
source at outlet of Lower Red Lake in northwestern 
portion of Minnesota and flows westerly about 196 
miles to its junction with Red River of the North at 
East Grand Forks, Minn. Clearwater River has a 
general westerly course from its source near Ebro, 
Minn., about 205 miles to its junction with Red Lake 
River at Red Lake Falls, Minn. (For general location, 
see Geological Survey map of Minnesota.) 
Existing project. See page 1282 of Annual Report for 
1962. Project was authorized by 1944 Flood Control 
Act (H. Doc. 345, 78th Cong. 1st sess., containing latest 
published map.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Structures were operated and maintained and miscellaneous 
inspections and reports were made by hired 
labor at a cost of $16,396. It is estimated that operation 
of the Red Lake Dam resulted in savings in damages 
from floods of about $102,700 during the year. 
Condition at end of fiscal year. Construction of major 
improvements on Red Lake River initiated in February 
and the Clearwater River initiated in October 
1948 were completed in June 1956. Replacement of 
rock-and-brush dam on Red Lake River at Indian 
boundary with a concrete structure and appurtenant 
work was completed in June 1959 to restore marshes in 
area to better wildlife conditions. Construction of 
bridge on Clearwater Road was completed by the 
Indian Service in July 1965. A contract for improvements 
on Red Lake River was completed in 
November 1966, and a contract for restoration of water 
levels in Red Lake River marshes was completed in 
July 1967. Increased slope protection downstream of 
the control structure was completed in November 1968. 
Operation of Red Lake Dam was assumed by the 
Corps on April 1, 1951. Channels are in good condition 
and indicate effectiveness of project as a flood control 
measure. 
27. RED RIVER OF THE NORTH 
DRAINAGE BASIN, MINN., S. DAK., & 
N. DAK. 
Location. Red River of the North Basin, within the 
United States, includes northeastern corner of South 
Dakota and much of eastern North Dakota and 
northwestern Minnesota. Red River of the North, 
formed by confluence of Otter Tail and Bois de Sioux 
Rivers, flows northward through this region, forming 
boundary between North Dakota and Minnesota. (For 
general location of basin, see Geological Survey maps 
of Minnesota and North Dakota.) 
Previous projects. See page 1278 of Annual Report for 
1962 for navigation and flood control projects in the 
basin, not part of this project. 
Existing project. Project includes improvements for 
local protection in interests of flood control and major 
drainage accomplished by channel improvement, 
levees, etc., in addition to construction of a multiplepurpose 
reservoir on Otter Tail River to control floods 
and, in conjunction with previously authorized Federal 
Reservoir project at Baldhill site of Sheyenne River 
and at Red Lake, to increase low flows for water supply 
and pollution abatement. (See table 26-F for active 
units in comprehensive basin plan.) 
810

ST. PAUL, MINN., DISTRICT 
Project was authorized by Flood Control Acts of 
1948 and 1950. Public Works Authorization Act, 1957, 
authorized Chief of Engineers to acquire such lands as 
were beyond legal authority of city of Grand Forks to 
acquire. Latest published map is in House Document 
185, 81st Congress, 1st session. 
Local cooperation. See page 1039 of Annual Report for 
1965. 
Operations and results during fiscal year. Maintenance: 
Orwell Dam was operated as required and necessary 
repairs made by hired labor at a cost of $30,798. It is 
estimated that damages from flooding in the amount of 
$218,700 were prevented during the year by improvements. 
Condition at end offiscalyear. Major construction for all 
active units is complete. A total of 1,985 acres of land 
for Orwell Reservoir is owned in fee by the United 
States. See page 1281 of Annual Report for 1962 for 
periods of completion at active units of project other 
than Fargo. Work at Fargo, N. Dak., started in May 
1959, was completed in July 1963. Project as a whole is 
complete except for recreational facilities at Orwell 
Reservoir. (See table 26-F at end of chapter for total 
costs of new work to June 30, 1970.) 
Costs to June 30, 1970 for operation and maintenance 
of Orwell Dam are $389,724. Total costs for 
active portion of project are $6,733,087. In addition, 
$350,034 expended from contributed funds for work 
done for local interests. 
28. ROSEAU RIVER, MINN. 
Location. In Roseau County and northeastern Kittson 
County, in northwestern Minnesota, and in southcentral 
Manitoba, Canada. (For general location of the 
works in United States see Geological Survey map of 
Minnesota.) 
Existing project. Provides for improvement of Roseau 
River for flood control by channel enlargement, 
clearing, and realignment of the river from the dam at 
Roseau, mile 137.5, downstream to mile 93.8, being a 
point 2.6 miles upstream from the International 
Boundary. Three short reaches of levee will be built in 
the United States and remedial works will be constructed 
in Canada at the expense of the United States, 
made necessary by improvements on Roseau River in 
the United States. Consideration is being given to 
expanding improvements to provide protection at 
Roseau village. Consideration for levee improvement 
through Big Swamp to reduce overbank flow into Two 
Rivers appears to be infeasible. Estimated cost (1970) 
to the United States for new work is $3,880,000, 
including $578,000 for cost of work in Canada to be 
accomplished with United States funds. Project was 
authorized by Flood Control Act of 1965 (H. Doc. 282, 
89th Cong., 1st sess., containing latest published map.) 
Local cooperation. See annual report for 1968 for 
requirements. Local interests have formed a watershed 
district but have not been requested to furnish local 
cooperation. 
Operations and results during fiscal year. New Work: 
Preconstruction planning was continued at a cost of 
$73,210. 
Condition at end of fiscal year. Construction has not 
started. Preliminary planning is in progress. 
29. RUSHFORD, MINN. 
Location. At confluence of Root River and Rush 
Creek adjacent to city of Rushford in Fillmore County 
in southeastern Minnesota. Confluence of streams is 
32.5 miles above mouth of Root River, a tributary of 
Mississippi River. (For general location, see Geological 
Survey map of Minnesota.) 
Existing project. Provides for improvements on Root 
River and Rush Creek to protect city of Rushford from 
floods expected to occur once in 200 years. See page 
1095 of Annual Report for 1967 for further details. 
Project was authorized by 1958 Flood Control Act (H. 
Doc. 431, 84th Cong., 2d sess., containing latest 
published map). 
Local cooperation. See page 1095 of Annual Report for 
1967 for requirements. Assurances of local cooperation 
were accepted on March 8, 1967. The project was 
turned over to local interests on December 15, 1968, for 
operation and maintenance. 
Operations and results during fiscal year. New Work: 
Construction engineering was done by hired labor at a 
cost of $63,537. Final contract payments for general 
improvements and construction of the track raise and 
bridge relocation were made for $23,965. Placement of 
riprap on the banks of Rush Creek to provide 
protection for the railroad bridge was completed in 
November 1969 at a cost of $15,799. 
Condition at end of fiscal year. Construction of general 
improvements was essentially completed in November 
1968. Construction of track raise and bridge relocation 
by the railroad was physically completed in June 1969. 
Placing riprap at the railroad bridge was completed in 
November 1969. 
30. ST. PAUL AND SOUTH ST. PAUL, 
MINN. 
Location. At St. Paul and South St. Paul, Minn. on 
right bank of Mississippi River between miles 843 and 
832 above mouth of Ohio River. (For general location 
see Geological Survey map of Minnesota.) 
Existing project. Provides for protection of west side 
area of St. Paul, exclusive of airport area, by means of 
levees, floodwalls, and interior-drainage facilities and 
for protection of South St. Paul by raising and 
extending existing flood barrier and providing additional 
facilities for interior drainage. For details see 
page 1123 of Annual Report for 1966. Estimated cost 
(1970) for new work at St. Paul is $2,848,000 and $477, 
000 to be contributed by local interests under au- 
811

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
thorized project. Estimated United States cost (1970) 
for new work at South St. Paul is $5,648,000 and $109, 
000 to be contributed by local interests. An additional 
$244,000 was contributed by cities of St. Paul and 
South St. Paul to cover work they requested. Project 
was authorized by 1958 Flood Control Act (H. Doc. 
223, 85th Cong., 1st sess., containing latest published 
map). 
Local cooperation. See page 1096 of Annual Report for 
1967 for provisions. Local cooperation for both St. Paul 
and South St. Paul has been fully complied with. 
Project was turned over to the city of St. Paul on July 
15, 1963 and to South St. Paul for operation on March 
1, 1968. Formal transfer was made on June 26, 1968. 
Operations and results during fiscal year. New Work: St. 
Paul: Miscellaneous hired labor activities cost $11,484. 
Final payment for contract claims in the amount of 
$36,400 was made on June 9, 1970. South St. Paul: 
Construction engineering by hired labor was accomplished 
at a cost of $206. Miscellaneous hired labor 
activities relating to completion of the project were 
continued at a cost of $20,641. 
Condition at end of fiscal year. St. Paul: This portion of 
the project is physically completed. Remedial work at 
pumping plants remain to complete the project. Total 
cost to date of this unit is $2,821,997 Federal funds and 
$663,466 contributed funds, a total of $3,485,463. 
South St. Paul: This portion of the project is also 
physically complete except for minor work. The main 
contract was physically completed in May 1968. Total 
cost to date for this unit is $5,609,721 Federal funds and 
$122,500 contributed funds, including work done in 
lieu of a cash contribution, a total of $5,732,221. 
31. WARROAD RIVER & BULL DOG 
CREEK, MINN. 
Location. Vicinity of Warroad, Minn., near mouth of 
Warroad River in north- central Minnesota, near 
international boundary. Warroad River flows into 
Lake of the Woods, a part of Hudson Bay drainage 
system. (For general location see Geological Survey 
Map of Minnesota.) 
Existing project. Provides for enlarging, straightening, 
and clearing about 8.6 miles of Warroad River 
extending upstream from East Branch, the lower 7.5 
miles and 4.5 miles on East Branch and Bull Dog 
Creek, respectively, entire 4-mile reach of county ditch 
10 including 1 mile of diversion ditch, and entire 9.2 
miles of county ditch 6. Also included are a control 
structure on Warroad River at outlet of Reserve ditch 
system, a levee along Warroad River to prevent 
overflow into adjacent Roseau River Basin, seven drop 
structures, paved grade crossings, and other work. 
Estimated Federal cost (1970) for new work is $1,630, 
000 and $156,000 to be contributed by local interests. 
Project was authorized by 1962 Flood Control Act. (H. 
Doc. 499, 87th Cong., 2d sess., contains latest published 
map.) 
Local cooperation. See p. 1125 of Annual Report for 
1966. Local interests have not been requested to furnish 
assurances. 
Operations and results during fiscal year. Preconstruction 
planning was continued at a cost of $28,828. 
Condition at end of fiscal year. Construction has not 
started. Preliminary planning is in progress. 
32. ZUMBRO RIVER, MINN. 
Location. Lower end of Zumbro River, in Wabasha 
County in southeastern Minnesota, between Kellogg, 
Minn., and its mouth at the Mississippi River. (For 
general location, see Geological Survey map of 
Minnesota.) 
Existing project. Provides for construction of about 15, 
900 feet of continuous channel improvement including 
two channel cutoffs, the construction of a system of 
continuous setback levees, totaling about 23,500 feet, 
paralleling both banks of the river along the channel 
enlargement reach, and slope protection of riverbank 
areas susceptible to bank erosion, all to alleviate 
damages from flooding. Estimated cost (1970) to the 
United States for new work is $2,160,000. Project was 
authorized by 1965 Flood Control Act (H. Doc. 246, 
88th Cong., 2d sess., contains latest published map.) 
Local cooperation. See p. 827 of Annual Report for 1969 
for requirements. A Cooks Valley Watershed District 
has been formed, but local interests have not been 
requested to furnish assurances of local cooperation. 
Local interests involved no longer wish the project to 
provide for a roadway over the top of the levees. This 
obviates the need for a cash contribution of 1.5 percent 
of the actual cost of construction for widening levees to 
provide for a roadway and noted in the project 
document local cooperation requirements. The project 
plan now includes relocation of the roadway along the 
landside of the north levee at non-Federal cost. 
Operations and results during fiscal year. Preconstruction 
planning was continued at a cost of $22,683. 
Condition at end of fiscal year. Construction not started. 
Preliminary planning in progress. 
33. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Projects were inspected to determine that project 
channels are kept clean and unobstructed, dikes and 
revetments are in good condition and structures are in 
good repair and operable. Deficiencies, if any, were 
minor unless noted. (See table 26-G on inspection of 
completed flood control projects.) 
Cost for the year were $9,079. Total cost to June 30, 
1970 was $74,550. 
34. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 26-H. 
812

ST. PAUL, MINN., DISTRICT 
35. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public La 
858, 80th Congress, as amended (preauthorization). 
See table 26-I. 
Emergency flood control activities-repairf,l oodf ighting, a. 
rescue work (Public Law 99, 84th Cong., and antecede 
legislation). 
See table 26-J. 
GENERAL INVESTIGATIONS 
36. SURVEYS 
Navigation studies continued at a fiscal year cost 
$69,356. Flood control studies continued at a fiscal yep 
cost of $427,865. Special studies in coordination wit 
the Soil Conservation Service on watershed studies, ti 
Great Lakes water levels study, and Souris-Red-Rain 
River Basins Commission study were conducted at 
451-584 0-72-52 
1w 
nd 
'nt 
fiscal year cost of $12,466. Basin studies were conducted 
for the Great Lakes Region, Souris-Red-Rainy 
Region, and Upper Mississippi River Basin at a fiscal 
year cost of $338,235. Total cost of surveys for the year 
was $847,922. 
37. COLLECTION AND STUDY OF BASIC 
DATA 
Fiscal year costs were $13,458 for International Joint 
Commission activities for regulation of Lake of the 
Woods watershed, and $169,012 for Flood Plain 
Management Services, a total of $182,470. See table 
26-K. 
of 38. RESEARCH AND DEVELOPMENT 
ar 
th Fiscal year cost was $47,937 for streamflow data 
he obtained by Corps gaging beyond cooperative stream- iy gaging program, and for hydraulic laboratory work in 
a measurement and analysis of sediment load in streams. 
813

REPORT OF THE CHIEF OF ENGINEERS, U.Se ARMY 1970 
TABLE 26-A 
See 
Section 
of Text Project 
1. Big Bay Harbor, 
Michigan 
2. Cornucopia 
Harbor, Wis. 
3. Duluth-Superior 
Harbor, Minn. 
and Wis. 
4. Grand Traverse 
Bay Harbor, 
Michigan 
5. Keweenaw 
Waterway, 
Michigan 
6. Knife River 
Harbor, Minn. 
7. Lac La Belle 
Harbor, Mich. 
8. Minnesota River, 
Minnesota 
10. Ontonagon 
Harbor, 
Michigan 
11. Reservoirs at 
Headwaters of 
Mississippi River, 
Minn. 
COST AND FINANCIAL STATEMENT 
Total to 
Funding FY67 FY68 FY69 FY70 30 June 1970 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
-D 
78,000 
5,693 
4,337 
972,000 
16,234 
281,000 
259,342 
14,500 
7,068 
-51,000 
11,707 
839 
839 
264 
264 
215,000 
875,384 
10,000 
11,327 
70,000 
17,096 
137,000 
151,141 
170,000 
173,074 
224,000 
46,878 
2,736 
3,692 
-328,602 
180,848 
334,564 
292,766 
1,200 
8,632 
130,505 
9,350 
- 
1,244 
1,244 
699,000 
698,171 
122,000 
114,609 
237,000 
311,735 
351,200 
173,902 
400,000 
224,742 
20,000 
215,938 
5,000 
5,000 
-9,500 
419,364 
321,200 
310,564 
12,400 
12,400 
38,700 
163,908 
2,561 
2,561 
-25,000 
39,050 
8,000 
13,826 
129,600 
131,747 
56,000 
103,172 
301,000 
389,694 
10,000 
55,060 
14,000 
14,000 
-25,000 
8,339 
692,800 
774,529 
20,794 
20,794 
11,580 
12,081 
14,000 
14,000 
15,295 
15,295 
-47,800 
23,434 
125,000 
126,565 
20,500 
20,580 
54,000 
25,856 
310,826 
362,148 
814 
$ 340,433' 
340,433 
432,000 
423,400 
462,653 
462,653 
160,469 
160,469 
15,757,4082 
15,757,4082 
8,355,949 
8,352,7393 
197,771 
197,771 
335,763 
335,763 
5,967,141 
5,967,141 
4,827,405 
4,827,3034 
271,745 
271,745 
73,901 
73,901 
269,270 
269,270 
27,245s 
27,245s 
2,057,7226 
2,057,7226 
458,091 
458,091 
331,9037 
331,903 
2,041,653 
2,041,653 
2,347,4788 
2,150,562 
4,658,458 
4,598,8259

ST. PAUL, MINN., DISTRICT 
TABLE 26-A (Cont'd) 
See 
Sec 
in1 
12. 
:tion 
Text Project 
St. Croix River, 
Minn. and Wis. 
13. Saxon Harbor, 
Wis. 
14. Two Harbors, 
Minn. 
17. Big Stone Lake and 
Whetstone River, 
Minn. & S. Dak. 
18. Eau Galle 
River, Wis. 
19. Guttenberg, 
Iowa 
20. Homme Reservoir 
and Dam, N. Dak. 
21. Lac qui Parle, 
Minnesota River, 
Minn. 
22. La Farge Lake 
and Channel 
Imp., Wis. 
23. Lake Ashtabula and 
Baldhill Dam 
Sheyenne River, 
N. Dak. 
24. Lake Traverse 
and Bois de 
Sioux River, 
S. Dak. and 
Minnesota 
25. Mankato and 
North Mankato, 
Minn. 
I 
COST AND FINANCIAL STATEMENT 
Total to 
Funding FY67 FY68 FY69 FY70 30 June 1970 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
35,000 
44,081 
5,000 
24,195 
10,000 
5,860 
-2,000 
1,545 
80,000 
119,934 
1,300,000 
1,244,267 
100,000 
87,071 
37,000 
6,450 
24,100 
18,525 
35,000 
36,564 
247,000 
257,223 
21,000 
4,436 
59,200 
50,353 
45,000 
63,055 
45,000 
75,835 
107,000 
107,000 
51,404 
57,816 
-2,306 
1,834 
16,000 
16,000 
115,000 
121,860 
1,495,000 
1,588,997 
115,000 
54,034 
7,000 
38,633 
17,000 
29,992 
34,000 
38,289 
22,000 
72,313 
67,000 
8,964 
58,800 
73,955 
49,200 
47,745 
75,000 
74,026 
22,000 
22,000 
2,969 
2,969 
1,200 
1,200 
400,000 
60,106 
1,122,000 
811,036 
4,569 
11,956 
78,000 
69,100 
6,000 
844 
33,975 
27,327 
500,000 
313,716 
51,000 
57,294 
71,700 
63,669 
6,000 
52,000 
51,901 
400,000 
163,063 
10,000 
10,000 
9,604 
9,604 
35,000 
34,490 
299,299 
427,800 
681,823 
15,300 
14,354 
8,000 
119,281 
4,000 
123 
90,000 
49,505 
53,000 
57,273 
750,000 
786,837 
25,000 
93,310 
234,000 
92,074 
49,000 
43,294 
23,900 
220,843 
815 
$150,410 
150,410 
454,402 
454,402 
507,50710 
507,50710 
22,197 
22,197 
3,709,27211 
3,709,2721 
404,782 
404,272 
685,000 
634,268 
7,728,000 
7,657,658 
15,300 
14,354 
297,569 
297,569 
1,397,09712 
1,393,220 
460,978 
411,007 
939,073 
933,917 
694,817 
691,003 
2,082,018 
1,912,205 
2,896,83813 
2,896,83813 
990,558 
833,430 
1,339,927 
1,333,927 
620,570 
612,506 
815,700 
773,579

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 26-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 30 June 1970 
26. Red Lake River, New Work 
Minn., Including Approp. $ 21,000 $ - $ - $ - $3,120,07914 
Clearwater River, Cost 141,473 3,556 - - 3,120,07914 
Minn. Maint. 
Approp. 11,000 9,900 43,025 12,000 218,304 
Cost 11,440 15,468 37,962 16,397 216,689 
27. Red River of the New Work 
North Drainage Approp. 443 27,500 13,000 - 6,492,98415 
Basin, Minnesota, Cost 7,026 41,199 654 - 6,478,69915 
S. Dak. and Maint. 
N. Dak. Approp. 27,500 20,000 43,000 28,000 394,111 
Cost 27,933 27,594 39,392 30,798 389,725 
28. Roseau River, New Work 
Minnesota Approp. 45,000 130,000 73,000 50,000 298,000 
Cost 34,685 55,395 56,092 73,210 219,382 
29. Rushford, New Work 
Minnesota Approp. 270,000 1,430,000 718,000 -64,000 2,635,979 
Cost 90,256 1,399,694 729,501 103,301 2,602,646 
30. St. Paul and New Work 
South St. Paul, Approp. 2,100,000 1,584,000 -25,000 11,100 8,496,012 
Minnesota Cost 2,346,021 1,444,324 42,798 68,732 8,431,718 
(Regular Funds) 
(Contributed New Work 
Funds) Contrib. - - - - 794,00016,18 
Cost 79,900 13,500 - -13,500 747,96617,18 
31. Warroad River New Work 
and Bull Dog Approp. -5,000 24,000 33,000 50,000 200,000 
Creek, Minn. Cost 53,814 27,192 37,437 28,828 164,835 
32. Zumbro River, New Work 
Minnesota Approp. - 84,000 - - 84,000 
Cost - 13,401 12,872 22,683 48,956 
1. Excludes $56,500 contributed by local interests for new 
work. 
2. Includes $1,547,195 for new work for previous projects. 
3. Includes $3,636 for rock in stockpile. 
4. Includes stock on hand June 30, 1969, $749 and 
$402,242 expended between 1893 and 1917 from permanent 
indefinite appropriations for operation and care. 
5. Excludes $38,190 contributed by local interests for new 
work. 
6. Includes $117,542 for new work for previous project. 
Excludes $359,202 contibuted funds for new work. 
7. Excludes $284,802 for new work and $113,326 for 
maintenance for previous projects. 
8. Includes 681,805 for new work. 
9. Includes $100,857 for maintenance from previous 
project. 
10. Excludes $50,193 contributed by local interests for new 
work. 
11. Includes $48,404 National Industrial Recovery Act for 
new work funds. 
12. Excludes $56,220 contributed funds for new work, 
13. Excludes $208,000 contributed funds for new work. 
14. Excludes $30,020 contributed funds for new work. 
15. Includes cost of the following deferred or inactive units 
and units on which authorization has expired; East Grand Forks, 
$57,200; Maple River, $1,241; Moorhead, $27,700; Sheyenne 
$37,956; Wahpeton-Breckenridge, $11,239. In addition, 
$203,874 special deposit funds and $146,160 in other 
contributed funds have been expended for work done under 
Government contract paid for by local interests. 
16. Includes $244,000 for work being done at request of 
local interests. 
17. Includes $210,966 expended for work being done at 
request of local interests. 
18. Excludes $38,000 expended by South St. Paul for work 
in lieu of required cash contribution. 
816

ST. PAUL, MINN., DISTRICT 
AUTHORIZING LEGISLATION 
Work Authorized 
Aug. 26, 1937 
Sept. 3, 1954 
June 3, 1896 
June 13, 1902 
Mar. 2, 1907 
May 28, 1908' 
July 27, 1916 
Mar. 2, 1919 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 19352 
July 16, 19523 
July 14, 1960 s 
Oct. 4, 1961 
Sept. 19, 1890 
June 25, 1910 
Mar. 2, 1919 
Aug. 30, 19356 
CORNUCOPIA HARBOR, WIS. (See Section 2 of Text) 
Entrance channel 50 feet wide and 10 feet deep between 
existing piers from bay to a turning basin 200 feet long, 
8 feet deep, with maximum width of 180 feet, with 150- and 
300-foot inner channels each 50 feet wide and 8 feet deep. 
Reconstruction and Federal maintenance of east and west 
entrance piers, a 25-foot extension of west pier and a 
300-foot extension of existing westerly inner channel at a 
depth of 8 feet and a width of 50 feet. 
DULUTH-SUPERIOR HARBOR, MINN., and WIS. (See Section 3 of Text) 
Dredging. 
Rebuilding piers at Superior entry. 
Enlarge plan for Superior entry and additional dredging near 
draw span of Burlington Northern Railway bridge. 
Dredging additional area for basin inside Duluth entrance 
to 22-foot depth. 
Enlarging Superior Harbor Basin. 
Removal of shoal point at southerly end of East Gate Basin. 
Howards Bay Channel, 20 feet deep. 
Deepening and widening channels and basins. 
Deepen Superior Front Channel and a portion of East Gate Basin 
to 25 feet. 
Present project dimensions of channels and basin. 
Abandons northerly portion of 21st Avenue West Channel. 
KEWEENAW WATERWAY, MICH. (See Section 5 of Text) 
Acquisition of waterway; for a 16-foot channel of 70-foot 
bottom width, renew canal revetments, reconstruct and extend 
piers at upper entrance to 30-foot depth of water, and at 
proper time for increase of channel depth to 20 feet with 
bottom width of not less than 120 feet (increase in width and 
depth of channel approved Mar. 15, 1898). 
Anchorage basin just within lower entrance about mile long, 
800 feet wide; a mooring pier on its westerly side 2,000 feet 
in length, and for purchase of necessary land. 
Princess Point Cutoff channel. 
General deepening, widening, and straightening of channels 
and basins to provide 25-foot depth with additional overdepth 
at entrances, extend lower entrance breakwater, and necessary 
alteration or replacement of structures due to deepening 
channels. 
KNIFE RIVER HARBOR, MINN. (See Section 6 of Text) 
Dredging. 
Breakwater and modified channels. 
MINNESOTA RIVER, MINN. (See Section 8 of Text) 
Open-channel improvement from mouth to Shakopee to obtain a 
channel of 4-foot depth to accommodate vessels with 
3-foot draft. 
H. Doc. 686, 77th Cong., 2d sess. 
and Annual Report for 1949. 
H. Doc. 463, 83d Cong., 2d sess. 4 
Annual Report 1891, p. 2209. 
817 
TABLE 26-B 
Acts Documents 
S. Committee, 75th Cong., 1st 
sess. 
H. Doc. 434, 83d Cong., 2d sess. 4 
H. Ex. Doc. 59, 53d Cong., 3d 
sess. and Annual report, 1895, 
p. 2538 
H. Doc. 82, 59th Cong., 2d sess. 
H. Doc. 221, 60th Cong., 1st sess. 
H. Doc. 651, 64th Cong., 1st 
sess. 
H. Doc. 1018, 64th Cong., 1st 
sess. 
H. Doc. 245, 69th Cong., 1st sess. 
and Rivers and Harbors Committee 
Doc. 32, 71st Cong., 2d sess. 
H. Doc. 482, 72d Cong., 2d sess. 
H. Doc. 374, 82d Cong., 2d sess. 
H. Doc. 150, 86th Cong., 1st 
sess.4 
H. Doc. 196, 86th Cong., 1st 
sess. 4 
H. Ex. Doc. 105, 49th Cong., 
2d sess. and Annual Report, 
1887, p. 1977. 
H. Doc. 325, 60th Cong., 1st sess. 
H. Doc. 835, 63d Cong., 2d sess. 
H. Doc. 55, 73d Cong., 1st sess. 4 
Mar. 2, 1945 
Sept. 3, 1954 
July 13, 1892

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 26-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Dredging to provide channel of 9-foot depth from mouth to 
mile 14.7. 
ONTONAGON HARBOR, MICH. (See Section 10 of Text) 
Channel 17 feet deep and 150 feet wide through bar and 15 feet 
deep and 100 feet wide between piers, and pier maintenance. 
Modified project widths and provided inner basin. 
Deepening approaches and extending harbor basin. 
S. Doc. 144, 84th Cong., 2d 
sess. 4 
H. Doc. 602, 61st Cong., 2d sess. 
S. Committee print, 74th Cong., 
2d sess. 
H. Doc. 287, 87th Cong., 2d 
sess.4 
July 3, 1958 
June 25, 1910 
Aug. 26, 1937 
Oct. 23, 1962 
Mar. 3, 1899 
Mar. 2, 1907 
June 25, 1910 
July 27, 1916 
June 26, 19347 
June 18, 1878 
June 3, 1896 
Jan. 21, 1927 
Aug. 30, 1935 
May 17, 1950 
Aug. 5, 1886 
Aug. 5, 1886 
Aug. 30, 1935 
Nov. 7, 1945 
July 14, 1960 
ST. CROIX RIVER, MINN. AND WIS. (See Section 12 of Text) 
Dredging, etc., for a 3-foot channel between mouth and 
Taylors Falls. 
Harbor and waterfront at Stillwater. 
A 6-foot channel to Stillwater. 
The 9-foot channel from mouth to Stillwater. 
Small-boat harbor at Hudson. 
TWO HARBORS, MINN. (See Section 14 of Text) 
Breakwater and dredging. 
Construction of two breakwater piers. 
Shore connection to east breakwater and dredging maneuvering 
area. 
Construct new east breakwater and enlargement of maneuvering 
basin. 
Deepen harbor project depths from 26 and 28 feet to 28 and 
30 feet, respectively. 
H. Ex. Doc. 75, pt 6, 43d Cong., 
2d 9 sess; Annual Report 1875, 
p. 372 
H. Doc. 378, 69th Cong., 1st 
sess. 9 
H. Doc. 184, 72d Cong., 1st sess. 9 
H. Doc. 184, 81st Cong., 1st 
sess. 
H. Ex. Doc. 94, 48th Cong., 
2d sess. 
Annual Report for 1887, p. 1952 
Rivers and Harbors Committee Doc. 
17, 72d Cong., 1st sess. 
H. Doc. 805, 78th Cong., 2d sess. 
H. Doc. 146, 86th Cong., 1st 
sess. 
1. Administrative act, section 4. 
2. Included in Public Works Administration program 
September 6, 1933. 
3. Public Law 568, 82d Congress. 
4. Contains latest published map. 
5. Public Law 388, 87th Congress. 
6. Included in Emergency Relief Administration program, 
May 28, 1935. 
7. Permanent Appropriations Repeal Act. 
8. For Map, see p. 1978, Annual Report for 1911. 
9. See H. Doc. 462, 71st Congress, 2d sess. for latest 
published map. 
818 
RESERVOIRS AT HEADWATERS OF MISSISSIPPI RIVER (See Section 11 of Text) 
Reconstruct 4 of the 5 original dams and surveys to determine 
extend of lands overflowed by reservoirs. 
Reconstruct Sandy Lake Dam and construct Gull Lake Reservoir. 
Construct an equalizing canal between Winnibigoshish and Leech H. Doc. 363, 61st Cong., 2d sess. 8 
Lake Reservoirs (no work was done and this part of the 
project abandoned in act of Mar. 4, 1915). 
Abandonment of ditches connecting Long Lake, Round Lake, H. Doc. 413, 64th Cong., 1st 
and Gull Lake. sess.8 
Operation and maintenance provided for with funds from War 
Department appropriations for rivers and harbors.

RESERVOIRS AT HEADWATERS OF MISSISSIPPI RIVER 
TABLE 26-C (See Section 11 of Text) 
Wi 
Le 
Pc 
Sa 
Pi 
Minimum 
Reservoir Stages 
(feet) 
innibigoshish 6 
eech Lake 0 
)kegama 6 
ndy Lake 7 
ne River 9 
Gull Lake 
Outlet Area (square miles) Capacity Previous Projects Existing Projects 
at Total Above Watershed Maximum Com- Com- Cost 
River St. Paul (square Original Reservoir Stage Cost Cost 
(miles) miles) (acre-feet) 
Mississippi 408 
Leech 410 
Mississippi 344 
Sandy 267 
Pine 199 
5 Gull 168 
1,442 
1,163 
6602 
421 
117 
173 
24
8 
562 18 23.7 
287 20 20.5 
Surveys and flowage rights 
Recreational facilities 
Total new work 
Total operating and care 
Permanent indefinite appropriation for 
operating and care, Feb. 1, 1895, tc 
end of fiscal year 1936. 
Rehabilitation
Total 
1. Lower operating limits by regulations approved 
February 4, 1936, as modified December 29, 1944. 
2. Exclusive of area controlled by Winnibigoshish 
and Leech Lake Dams. 
179.4 967,930 1884 $214,000 1900 $ 173,470 $ 387,470 
250.9 743,320 1884 171,805 1902 84,380 256,185 
35.0 120,750 1884 85,000 1904 126,030 211,030 
16.6 72,500 1895 11 
177,520 1886 9' 
70,820 - 
- - $681 
- - 10( 
S- 
4,000 1909 117,020 231,020 
7,000 1907 133,320 230,320 
- 1913 86,826 86,826 
-- 160,939 160,939 
- - 586,772 586,772 m 
1,805 - 1,468,757 2,150,562 
0,857 - 3,530,771 3,631,628 
- - 967,197 967,197 " 
S - - - 425,000 425,000 
2,152,840 - $782,662 - $6,391,725 $7,174,387 2

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
RECONNAISSANCE AND CONDITION SURVEYS 
TABLE 26-D (See Section 15 of Text) 
Name of Project Date Survey 
Conducted 
Ashland Harbor, Wis. February 1964 
Black River Harbor, Mich. July 1970 
Eagle Harbor, Mich. June 1970 
Grand Marais Harbor, Minn. May 1970 
Marquette Harbor, Mich. September 1966 
Port Wing Harbor, Wis. July 1970 
Warroad Harbor and River, Minn. April 1970 
RED RIVER OF THE NORTH DRAINAGE BASIN: 
ACTIVE UNITS IN COMPREHENSIVE BASIN PLAN 
TABLE 26-F (See Section 27 of Text) 
Total 
Cost to Total 
Name of Unit State Type June 30, 1970 Estimated 
June 30, 1970 Federal Cost 
Orwell Reservoir (Otter Tail River) Minnesota Reservoir $1,897,468 $1,913,7001 
Wild Rice and Marsh Rivers Minnesota Channel improvement 405,056 405,100 
Rush River North Dakota Channel improvement 287,686 287,700 
Sand Hill River Minnesota Channel improvement 548,778 548,800 
Mustinka River Minnesota Channel improvement 440,788 440,800 
Otter Tail River Minnesota Channel improvement 174,768 174,800 
Red River at Grand Forks North Dakota Levees and floodwall 948,895 948,900 
Red River at Fargo North Dakota Channel improvement, levees 1,639,924 1,639,9002 
Total cost to date $6,343,3633 
Total estimated cost - $6,359,7004 
1. Includes $178,000 for lands and $22,000 for recreation 
facilities. 
2. Includes 67,900 for lands. 
3. Costs of following deferred or inactive units not included: 
Sheyenne, $37,956; Wahpeton-Breckenridge, $11,239. Authorization 
of East Grand Forks, Moorhead, and Maple River units has 
expired. Cost of these units total $86,141. 
4. See p. 1279 of Annual Report for 1962 for units deferred for 
restudy, inactive units and units on which authorization has expired, 
not included. 
820

ST. PAUL, MINN., DISTRICT 
TABLE 26-E OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Ashland Harbor, Wis. l 1967 $1,695,645 $ 864,1202 
Baudette Harbor, Minn.1 1961 36,415 21,717 
Bayfield Harbor, Wis.1 1961 183,855 2,805 
Beaver Bay Harbor, Minn.3 1945 - - 
Black River, Wis. 4 ,' 1950 67,585 - 
Black River Harbor, Mich.1 1969 383,3506 88,9577 
Chippewa Harbor, Isle Royale, Mich.1 1959 125,629 - 
Eagle Harbor, Mich.1 1969 205,1648 30,8839 
Grand Marais Harbor, Minn. 1966 450,972 260,06810 
La Pointe Harbor, Wis. 1 , 11 - 130,874 - 
Lake Traverse, Minn. and S. Dak. 1 2 ,1 3 1921 92 - 
Lutsen Harbor, Minn.3 1945 - - 
Marquette Harbor, Mich. 1967 1,282,893 584,62614 
Mississippi and Leech Rivers, Minn.1,11 1929 277,615 40,251 
Mississippi River between Brainerd and 
Grand Rapids, Minn. 
Is 1925 47,794 3,891 
Pine Creek, Angle Inlet, Minn.1 
' 
11 1964 38,700 - 
Port Wing Harbor, Wis. 1964 63,393 403,91716 
Presque Isle Harbor, Mich. 1966 1,190,492 174,60017 
Red Lake and Red Lake River, Minn.1 , 12 1923 9,070 
Red River of the North, Minn. and N. Dak.12 ,1 8 1921 293,344 76,209 
Warroad Harbor and River, Minn. 1965 83,805 526,09119 
Wisconsin River, Wis. 12,20 1888 - - 
Zippel Bay Harbor, Minn.4 ,15 1928 27,941 11,139 
1. Completed. 
2. Includes $637 expended in FY 1970. 
3. In view of the current interest for construction of a 
harbor and receipt of assurances of local cooperation, the project 
was reclassified 'active' on 16 February 1970. 
4. Inactive. 
5. Channels adequate for commerce. 
6. Excludes $30,000 contributed by local interests. 
7. Includes $1,249 expended in FY 1970. 
8. Exclusive of $27,800 contributed by local interests. 
9. Includes $758 expended in FY 1970. 
10. Includes $3,595 expended in FY 1970. 
11. Project authorized by Chief of Engineers under small 
project authority, Section 107, Public Law 86-645. 
12. No commerce reported. 
13. Abandonment recommended in 1915 (H. Doc. 439, 64th 
Cong., 1st sess.) and June 24, 1926 (H. Doc. 467, 69th Cong., 
1st sess.). 
14. Includes $18 expended in FY 1970. In addition, 
$465,747 has been expended for rehabilitation. 
15. Abandonment recommended June 24, 1926 (H. Doc. 
467, 69th Cong., 1st sess.). 
16. Includes $596 expended in FY 1970. In addition, 
$145,792 has been expended for rehabilitation of breakwater. 
17. In addition, $76,500 has been spent for rehabilitation. 
18. Abandonment recommended in 1915 (H. Doc. 1666, 63d 
Cong., 3d sess.). 
19. Includes $1,722 expended in FY 1970. 
20. Originally included in project 'Fox and Wisconsin Rivers, 
Wis.'. Abandonment of improvement of Wisconsin River by 
channel contraction works recommended in 1886 and 1887 (H. 
Ex. Doc. 65, 49th Cong., 2d sess.). Expenditures included under 
'Fox and Wisconsin River, Wis.'. No breakdown available. 
821

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 34 of Text) 
The following projects were inspected to determine that project channels are kept clean and unobstructed, dikes and revetments are in 
good condition and structures are in good repair and operable. Deficiencies, if any, were minor unless noted. Costs for the year were $9,079. 
Total cost to June 30, 1970, was $74,550. 
Project Dated Inspected 
Aitkin, Minn. 
Fargo, N. Dak. 
Forest River, N. Dak. 
Grand Forks, N. Dak. 
Lost River, Minn. 
Maple River, N. Dak. 
Marshall, Minn. 
Mines Creek, Spring Valley, Wis. 
Minneota, Minn. 
Mustinka River, Minn. 
Otter Tail River, Minn. 
Park River, N. Dak. 
Red Lake-Clearwater Rivers, Minn. 
Redwood River, Marshall, Minn. 
Rush River, N. Dak. 
Rushford, Minn. 
St. Paul, Minn. 
South St. Paul, Minn. 
Sand Hill River, Minn. 
Sheyenne River, N. Dak. 
Wild Rice-Marsh Rivers, Minn. 
Winona, Minn. 
November 1969 
July 1969 
November 19691 
July 1969 
November 1969 
November 1969 
September 1969 
September 1969 
September 1969 
November 1969 
November 1969 
November 19691 
November 1969 
November 1969 
November 1969 
December 1969 
July 1969 
August 1969 
November 1969 
November 19691 
November 1969 
July 1969 
1. Major deficiency. 
822 
TABLE 26-G

ST. PAUL, MINN., DISTRICT 
TABLE 26-H OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Dry Run, Iowa1 1966 $1,790,759 $ - 
Lost River, Minn. 1 1967 563,5532 
Marshall, Minn.1 1964 1,802,866 
Mellen, Wis.3 1960 7,202 
Minneota, Minn. 1,4 1963 161,545 
Mississippi River near Aitkin, Minn.1 1957 1,675,835 
Pembina River Reservoir, N. Dak.5 1950 50,000 
State Road and Ebner Coulees, Wis. 6 1969 - 
South Branch Wild Rice River and Felton Ditch, 
Minn. 6 1969 - 
Tongue River Reservoir, N. Dak.5 1950 23,695 
Upper Iowa River, Iowa1 1964 888,445 
Upper Mississippi River Basin (St. Paul Dist.), 
Black River Reservoir, Wis.7 1950 - 
Winona, Minn.1 1968 2,147,1318 
1. Completed. 5. Further work deferred pending review of project 
2. Includes $46,034 for the Ruffy Brook Unit for which document (inactive). 
authorization expired in April 1966. Excludes $246,911 6. Awaiting appropriation of funds. 
contributed by local interests. 7. Has not been selected for construction (inactive). 
3. Inactive, lack of economic feasibility. 8. Includes $111,500 for portion deferred for restudy. 
4. Project authorized by Chief of Engineers under small Excludes $17,316 contributed by local interests. 
project authority, section 205, 1948 Flood Control Act. 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 858, 
80th Congress, as amended (preauthorization) 
TABLE 26-I (See Section 35 of Text) 
Fiscal Year 
Study Identification Costs 
Blue Earth River, Minn. $ 500 
Bonnes Coulee, Velva, N. Dak. 12,8221 
Carver, Minn., Minnesota River 192 
Eau Claire, Wis., Chippewa River 15,798 
Elk River, Minn., Mississippi River 177,3562 
Grand Forks, N. Dak., Red River of the North 1,900 
Hastings, Minn., Vermillion River 8,325 
Hutchinson, Minn., South Fork, Crow River 10,088 
Oslo, Minn., Red River of the North 9,315 
Pembina River, N. Dak. 36,367 
Peterson, Minn., Root River 1,203 
Rush River, Lower Branch, N Dak. 1,061 
Tongue River, N. Dak. 7 
Warren, Minn., Snake River 2,500 
Willow Creek Basin, N. Dak. 80 
1. Includes $12,089 credit based upon final billing for contract 2. Includes $125,950 for a contract final payment for new work 
work accomplished in a prior year. construction. 
823

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
EMERGENCY FLOOD CONTROL ACTIVITIES - 
REPAIR, FLOOD FIGHTING, AND RESCUE WORK 
(Public Law 99, 84th Cong., and antecedent legislation) 
(See Section 35 of Text) 
Project 
Advance preparation 
Flood emergency operations: 
Great Lakes Region 
Upper Mississippi River Region 
Souris-Red-Rainy Region 
Total flood emergency operations 
Repair and restoration: 
Marshall, Minnesota 
Sand Hill River, Minnesota 
South St. Paul, Minnesota 
Total repair and restoration 
Total emergency flood control activities 
1. Adjustment in costs for work accomplished in a prior year. 
COMPLETED FLOOD PLAIN STUDIES 
TABLE 26-K (See Section 37 of Text) 
Date 
Location Requesting Agency Completed Federal Cost 
Eau Claire, Wis. City of Eau Claire March 1965 $17,000 
Seven County, Wis. Miss. River Regional Pl. Comm. June 1966 3,000 
Rockford, Minn. Village of Rockford March 1968 10,789 
Delano, Minn. City of Delano August 1968 12,350 
Rochester, Minn. City of Rochester February 1969 31,068 
LaCrosse, Wis. City of LaCrosse June 1970 25,591 
Granite Falls, Minn. City of Granite Falls June 1970 26,422 
824 
TABLE 26-J 
Federal Cost 
$ 39,265 
$ -9,7631 
234,994 
1,080,241 
$ 2,293 
2,543 
8,237 
$1,305,472 
$ 13,073 
$1,357,810

ROCK ISLAND, ILL., DISTRICT* 
This district comprises portions of western Illinois, 
southwestern Wisconsin, southern and southwestern 
Minnesota, eastern and central Iowa, and northeastern 
Missouri, embraced in drainage basin of Mississippi 
River and its eastern and western tributaries between 
mile 300 (above mouth of Ohio River) and 614, and of 
its eastern tributaries only, between Hamburg Bay, at 
mile 261 and 300. This district also includes Illinois 
and Mississippi Canal and drainage basin of Bureau 
Creek, Ill. Section of Mississippi River between 300 
and 614 is included in report on Mississippi River 
between Missouri River and Minneapolis, Minn. 
IMPROVEMENTS 
Navigation Page 
1. Illinois and Mississippi Canal, Ill. ........ 825 
2. Mill Creek and South Slough at 
Milan, Ill. ........................................ 826 
3. Mississippi River between Missouri 
River and Minneapolis, Minn. ....... 826 
4. Quincy, Ill., Harbor Access Channel ... 826 
5. Other Authorized Navigation Projects .. 826 
Flood Control 
6. Ames Lake, Skunk River, Iowa ............ 826 
7. Central City Lake, Upper Mississippi 
River Basin, Iowa ...... .................... 827 
8. Clinton, Iowa ....................................... 827 
9. Coralville Lake, Upper Mississippi 
River Basin, Iowa ........................... 827 
10. Des Moines, Iowa .................................. 827 
11. Dubuque, Iowa ........ .......................... 828 
12. Freeport, Ill. ......................................... 828 
13. Fulton, Ill. ........................................... 828 
14. Gregory Drainage District, Mo. ............. 828 
15. Hunt Drainage District and Lima 
Lake Drainage District, Ill. ................. 828 
16. Indian Grave Drainage District, Ill. ..... 829 
17. Iowa River-Flint Creek Levee District 
No. 16, Iowa ........................................ 829 
Page 
18. Marshalltown, Iowa River, Iowa ....... 829 
19. Muscatine Island Levee District and 
Muscatine-Louisa County Drainage 
District No. 13, Iowa .............. . 829 
20. Red Rock Dam and Lake Red Rock, 
Iowa .................. . ...................... ..... 829 
21. Rockford, Ill. .................................. 830 
22. Rock Island, Ill. ...................................... 830 
23. Saylorville Lake, Des Moines River, 
Iow a ........................................................ 830 
24. Sny Basin, Ill. .................................... 831 
25. Waterloo, Cedar River, Iowa ................. 831 
26. Inspection of Completed Flood Control 
Projects ........................................ 831 
27. Other Authorized Flood Control 
Projects ........................................ 831 
28. Flood Control Work Under Special 
Authorization .......... ......................... 831 
General Investigations 
29. 
30. 
31. 
Surveys ............... ............................ 832 
Collection and Study of Basic Data ..... 832 
Research and Development .................... 832 
NAVIGATION 
1. ILLINOIS AND MISSISSIPPI CANAL, 
ILL. 
Location. Extends for 75 miles from Illinois River near 
LaSalle to Mississippi River at Rock Island. 
Existing project. See pages 1306-1308 of Annual 
Report for 1962 for details regarding project. This 
obsolete canal is being repaired and modified prior to 
transfer to State of Illinois as part of the State park 
system. 
Operations and results during fiscal year. Maintenance to 
prevent further deterioration of canal structures cost 
$137,757. Work under repair and modification program 
continued at cost of -$12,229. 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
825

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end of fiscal year. Existing project completed 
in 1918. Canal has not been operated for 
navigation since June 1951. Repair and modification 
program to be accomplished prior to disposal of canal 
initiated in fiscal year 1961, and a number of canal 
features have been repaired or modified. In connection 
with the repair and modification program, fee title to 1, 
062 acres and recreational flowage easements over 309 
acres of land in Rock River near Rock Falls, formerly 
under navigational flowage easement, have been 
acquired. 
2. MILL CREEK AND SOUTH SLOUGH 
AT MILAN, ILL. 
Location. Mill Creek and South Slough at Milan, 
Rock Island County, Ill. 
Previous project. See page 1132, Annual Report for 
1932, and page 1081, Annual Report for 1938. 
Existing project. Provided for diversion of Mill Creek 
into South Slough, flood gates in walls of Illinois and 
Mississippi Canal to carry Mill Creek flood waters 
across canal right-of-way into Rock River, levees, and 
other works for flood protection at Milan. Project was 
modified to restore original Mill Creek outlet into Rock 
River. See table 27-C for authorizing legislation. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Minor channel 
maintenance was performed." 
Condition at end of fiscal year. Existing project was 
completed in 1932. Cost for existing project to June 30, 
1970, was $224,466, of which $63,634 was for new work 
and $160,832 for maintenance. In addition, $73,366 
was expended in 1962-63 from Illinois and Mississippi 
maintenance funds for restoration of Mill Creek outlet 
into Rock River. 
3. MISSISSIPPI RIVER BETWEEN 
MISSOURI RIVER AND 
MINNEAPOLIS, MINN. 
For report on this improvement see chapter on 
Mississippi River between Missouri River and Minneapolis, 
Minn. 
4. QUINCY, ILL., HARBOR ACCESS 
CHANNEL 
Location. Bay Island, located between the Mississippi 
River and Quincy Bay, 324.9 miles above the mouth of 
the Ohio River, at Quincy, Adams County, Ill. 
Existing project. Access to the Mississippi River for 
small craft launched or moored in Quincy Bay 
provided by excavation of a channel, 6,000 feet in 
length, 50 feet in bottom width, and 5 feet in depth, 
across Bay Island. See table 27-C for authorizing 
legislation. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Project was 
constructed. 
Condition at end of fiscal year. Construction initiated in 
August 1969 and completed in November 1969. 
5. OTHER AUTHORIZED NAVIGATION 
PROJECTS. 
See table 27-B.
FLOOD CONTROL 
6. AMES LAKE, SKUNK RIVER, IOWA 
Location. Site is in Story County, Iowa. Dam will be at 
mile 220.6 on Skunk River, and about 5 river miles 
upstream from city of Ames, Iowa. 
Existing project. Dam will consist of an earth embankment 
about 85 feet high and about 1,450 feet long. 
Outlet works will consist of 12-foot diameter tunnel, 
500 feet in length with gate tower on upstream end, 
terminating in a stilling basin. The principal spillway 
will be located in a saddle in left abutment. Overflow 
section will consist of a single tainter gate mounted on a 
low ogee crest. An emergency spillway will be provided 
in the right abutment. At full flood pool elevation 976, 
the lake will be about 9 miles long and will extend 
about 13 river miles upstream from the dam. At 
conservation pool elevation 950, the lake will be about 
6 miles long and will extend about 8 river miles 
upstream from the dam. Project will be operated for 
flood control, water quality control, recreation, and 
fish and wildlife enhancement. Total estimated Federal 
cost is $16,900,000 (July 1970), including $305,000 
future non-Federal reimbursement, exclusive of interest, 
for recreation and fish and wildlife enhancement. 
See table 27-C for authorizing legislation. 
Interstate Highway 35 is now under construction 
through State of Iowa. As originally planned, highway 
would have traversed part of Skunk River Valley to be 
occupied by the reservoir. Realignment of highway 
location to accommodate future reservoir has been 
undertaken at an additional estimated cost of $1,100, 
000 under a tripartite agreement among Bureau of 
Public Roads, Iowa State Highway Commission, and 
the Corps. Under this agreement, the Highway 
Commission will plan and construct the new perimeter 
highway, the Bureau will approve plans, construction, 
and billings incident thereto, and the Corps will 
disburse funds on the basis of State billings approved by 
the Bureau. 
Local cooperation. Local interests must furnish assurances 
that they will: 
(1) Administer project land and water areas for 
recreation and fish and wildlife enhancement; 
(2) Pay, contribute in kind, or repay (which may be 
through user fees), with interest, one-half of the 
separable costs of the Ames Lake project allocated to 
recreation and fish and wildlife enhancement, provided 
that greater participation under the same terms 
is permissible as may be agreed upon; 
826

ROCK ISLAND, ILL., DISTRICT 
(3) Bear all costs of operation, maintenance, and 
replacement of recreation and fish and wildlife lands 
and facilities; 
(4) Hold and save the United States free from 
damages due to water-rights claims resulting from 
construction and operation of the project; and 
(5) Exercise, to the full extent of their legal 
capability, control against removal of streamflow made 
available for water quality control. 
Negotiations are underway with the State of Iowa 
and Story County. 
Operations and results during fiscalyear. Disbursement of 
funds in connection with construction of Interstate 
Highway 35 was continued. Preliminary planning was 
continued. 
Condition at end of fiscal year. Construction not started. 
Preliminary planning in progress. 
7. CENTRAL CITY LAKE, UPPER 
MISSISSIPPI RIVER BASIN, IOWA 
Location. On Wapsipinicon River about 3 miles 
upstream from Central City and 110 miles above 
mouth of river, in Linn and Buchanan Counties, Iowa. 
Existing project. Plan of improvement contemplates 
construction of earth dam, 1,200 feet long, with 
concrete gravity spillway. Reservoir capacity is 230,000 
acre-feet, covering an area of about 11,000 acres. 
Project would provide a measure of flood protection for 
about 20,000 acres of agricultural land in lower reaches 
of Wapsipinicon River and reduce flood crests on 
Mississippi River downstream from mouth of Wapsipinicon. 
Estimated cost is $9,490,000 (1954). See 
table 27-C for authorizing legislation. Project is in 
"deferred for restudy" category. 
Local cooperation. None required. 
Operations and results during fiscal year. A feasibility 
report to determine whether project should be reclassified 
to "active" category was completed. 
Condition at end of fiscal year. Determination of project 
classification is pending. 
8. CLINTON, IOWA 
Location. On right bank of Mississippi River, 518.2 
miles above mouth of Ohio River, in Clinton County, 
Iowa. 
Existing project. Local protection from Mississippi 
River floods to be provided by construction of 7.5 miles 
of earth levee, about 0.75 mile of concrete floodwall, 
railroad raises, street ramps, closure structures, pumping 
plants, and gravity drainage outlets. Estimated 
project cost is $13,640,000 (July 1970), including $1, 
740,000 non-Federal cost for land and relocations. See 
table 27-C for authorizing legislation. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Local interests will also provide 
relocations and obtain legal control over pondage 
areas. Local interests will be requested to furnish 
assurances after a firm project plan is established. 
Operations and results during fiscal year. Preliminary 
planning initiated. 
Condition at end of fiscal year. No construction performed. 
Preliminary planning in progress. 
9. CORALVILLE LAKE, UPPER 
MISSISSIPPI RIVER BASIN, IOWA 
Location. On Iowa River, several miles upstream from 
Iowa City, in Johnson County, Iowa, about 83 miles 
above mouth of Iowa River. 
Existing project. An earthfill dam rising about 100 feet 
above streambed, a 500-foot uncontrolled spillway, 
outlet works to control flow of river to bankfull stage 
below dam, and a reservoir providing flood control 
pool of 475,000 acre-feet. In addition, a conservation 
pool is provided which varies from 17,000 acre-feet 
from February through June to 53,750 acre-feet from 
July to February of each year. Coralville Lake is used 
to store Iowa River flows temporarily during flood 
periods. Project minimizes flood damages on Iowa 
River from dam to mouth of Cedar River, and provides 
a high degree of protection to lands along Iowa River 
below mouth of Cedar River. Project also effects 
significant reduction of Mississippi River flows at 
Keokuk, Iowa, and reduction of flows at Cairo, Ill. 
Incidental benefits to conservation and recreation 
accrue from project. Power is not developed. Project 
modified to provide for highway bridge crossing the 
reservoir at the Mehaffey site. See table 27-C for 
authorizing legislation. 
Local cooperation. None required, except in connection 
with Mehaffey Bridge, which has been fully complied 
with. 
Operations and results during fiscal year. New work: 
Construction of recreation facilities continued. Maintenance: 
Routine maintenance activities continued. 
Condition at end of fiscal year. Construction began in 
July 1949 and project has been in operation since 
February 1958. About 24,112 acres of land were 
acquired in fee, and flowage easements obtained for 9, 
573 acres. Construction of Mehaffey Bridge began in 
June 1964 and completed in October 1966. 
10. DES MOINES, IOWA 
Location. Along Des Moines and Raccoon Rivers, in 
city of Des Moines, Iowa. Area is shown on State base 
maps of U. S. Geological Survey. 
Existing project. Provides for local flood protection at 
Des Moines by construction of levees and floodwalls, 
with appurtenant closure structures and sewer alterations. 
Estimated project cost is $5,577,000 (July 
1970), including $407,000 non-Federal cost for land 
and relocations. See table 27-C for authorizing 
legislation. 
827

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Construction in 
progress. 
Condition at end of fiscal year. Construction began in 
November 1966 and is in progress. 
11. DUBUQUE, IOWA 
Location. On right bank of Mississippi River, 579.3 
miles above mouth of Ohio River, in Dubuque County, 
Iowa. 
Existing project. Local protection from Mississippi 
River floods to be provided by construction of levees, 
walls, closure structures, a navigation opening for the 
commercial harbor, and interior drainage facilities. 
Estimated project cost is $12,130,000 (July 1970), 
including $1,330,000 non-Federal cost for land and 
relocations. See table 27-C for authorizing legislation. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Project construction 
continued. 
Condition at end of fiscal year. Construction started in 
June 1968 and is in progress. 
12. FREEPORT, ILL. 
Location. On Pecatonica River, about 59 miles above 
mouth of that stream, in Stephenson County, Ill. 
Existing project. A project to provide flood protection 
at the city of Freeport. Project was classified "deferred 
for restudy" from 1952 to 1962 because of problems of 
local cooperation and economic justification. A revised 
flood control plan would divert the Pecatonica River 
around the city along its northern edge. Estimated cost 
of the revised project is $6,480,000 (July 1970), 
including $1,280,000 non-Federal cost for land and 
relocations. See table 27-C for authorizing legislation. 
Local cooperation. Fully complied with. 
Operation and results during fiscal year. Preliminary 
planning continued. 
Condition at end of fiscal year. Construction not started. 
Preliminary planning in progress. 
13. FULTON, ILL. 
Location. On left bank of Mississippi River, 520.1 
miles above mouth of Ohio River, in Whiteside 
County, Ill. 
Existing project. Local protection from Mississippi 
River floods to be provided by construction of 12 miles 
of earth levee, railroad raises, road ramps, closure 
structures, gravity drainage outlets, ponding areas, 
storm sewer interceptors, and pumping plants. The 
improvements would also protect an adjacent rural 
area in the Cat Tail Drainage District, so as to provide 
access for the city to high ground. Estimated project 
cost is $6,630,000 (July 1970), including $780,000 non- 
Federal cost for land and relocations. See table 27-C for 
authorizing legislation. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Local interests will also provide 
relocations and obtain legal control over pondage 
areas. Local interests will be requested to furnish 
assurances after a firm project plan is established. 
Operations and results during fiscal year. Preliminary 
planning initiated. 
Condition at end of fiscal year. No construction performed. 
Preliminary planning in progress. 
14. GREGORY DRAINAGE DISTRICT, MO. 
Location. Right bank of Mississippi River, upstream 
from Canton, 347.8 to 354.4 miles above mouth of Ohio 
River, in Clark and Lewis Counties, Mo. Area is shown 
on topographic maps of U. S. Geological Survey. 
Previous project. For details see page 1185, Annual 
Report 1940. 
Existing project. Modification of 11.4 miles of agricultural 
levees to provide increased protection from 
Mississippi River floods. Estimated project cost is $1, 
772,000 (July 1968), including $172,000 non-Federal 
cost for land and relocations. See table 27-C for 
authorizing legislation. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Construction was 
continued. 
Condition at end offiscal year. Construction was initiated 
in August 1968 and is in progress. High water in spring 
of 1969 delayed progress on project. 
15. HUNT DRAINAGE DISTRICT AND 
LIMA LAKE DRAINAGE DISTRICT, 
ILL. 
Location. Left bank of Mississippi River, upstream 
from Quincy, from mile 341.7 to 358.6 above mouth of 
Ohio River, in Hancock and Adams Counties, Ill. The 
two districts are contiguous and have interrelated 
drainage and flood protection systems. Area is shown 
on topographic maps of Geological Survey. 
Existing project. Modification of 32.7 miles of agricultural 
levee to provide increased protection from 
floods on Mississippi River and several small tributaries. 
Plan includes detention reservoirs on Rocky 
Run and Jenifer Creek, modification of facilities at 
existing pumping plants, and road ramps. Estimated 
project cost is $4,617,000 (July 1970), including $307, 
000 non-Federal cost for land and relocations. See table 
27-C for authorizing legislation. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Construction of 
the detention reservoir on Rocky Run was continued. 
828

ROCK ISLAND, ILL., DISTRICT 
Preliminary planning for the detention reservoir on 
Jenifer Creek was continued. 
Condition at end of fiscal year. Construction began in 
July 1960. Levees along the Mississippi River and Bear 
Creek have been completed. Remaining work consists 
of construction of detention reservoirs on Rocky Run 
and Jenifer Creek. 
16. INDIAN GRAVE DRAINAGE 
DISTRICT, ILL. 
Location. Left bank of Mississippi River, several miles 
upstream from Quincy, 330 to 341.7 miles above 
mouth of Ohio River, in Adams County, Ill. Area is 
shown on topographic maps of U. S. Geological Survey. 
Existing project. Modification of 11.7 miles of agricultural 
levees to provide increased protection from 
floods on Mississippi River and several small tributaries. 
Estimated project cost is $4,140,000 (July 
1968), including $630,000 non-Federal cost for land 
and relocations. See table 27-C for authorizing 
legislation. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Levee construction 
was continued. 
Condition at end of fiscal year. Construction began in 
October 1966 and is nearing completion. 
17. IOWA RIVER-FLINT CREEK LEVEE 
DISTRICT NO. 16., IOWA 
Location. Right bank of Mississippi River, 405.7 to 
434.5 miles above mouth of Ohio River, in Louisa and 
Des Moines Counties, Iowa. Levees of district protect 
village of Oakville and agricultural lands in Louisa- 
Des Moines County Drainage District No. 4 and Des 
Moines County Drainage Districts Nos. 7 and 8. Area 
is shown on topographic maps of Geological Survey. 
Existing project. Modification of 48 miles of existing 
levee to provide increased protection from floods on 
Mississippi River, Iowa River, and three hill streams. 
Plan also includes modification of facilities of three 
existing pumping stations and road ramps. Estimated 
project cost is $6,950,000 (July 1970), including $580, 
000 non-Federal cost for land and relocations. See table 
27-C for authorizing legislation. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Preliminary 
planning for the downstream levee unit was in progress. 
Condition at end of fiscal year. Construction began in 
July 1962 and project is complete except for downstream 
portion of the Mississippi River levee, which has 
not been started. 
18. MARSHALLTOWN, IOWA RIVER, 
IOWA 
Location. Right bank of Iowa River in Marshall 
County, Iowa. 
451-584 0-72-53 
Existing project. Local protection from Iowa River 
floods to be provided by construction of levees, 
floodwalls, and interior drainage facilities. Estimated 
project cost is $6,070,000 (July 1970), including $1,490, 
000 non-Federal cost for rights-of-way and relocations. 
See table 27-C for authorizing legislation. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Local interests will also provide 
relocations and obtain legal control over pondage 
areas. Assurances were accepted on March 24, 1969. 
Operations and results during fiscal year. Preliminary 
planning continued. 
Condition at end of fiscal year. Construction not started. 
Preliminary planning in progress. 
19. MUSCATINE ISLAND LEVEE 
DISTRICT AND MUSCATINE-LOUISA 
COUNTY DRAINAGE DISTRICT NO. 
13, IOWA 
Location. Right bank of Mississippi River, immediately 
downstream from Muscatine, miles 434.8 to 
454.8 above mouth of Ohio River, in Muscatine and 
Louisa Counties, Iowa. The two districts, together with 
upper one-half mile of Louisa County Levee District 
No. 15, form a joint drainage and flood protection 
system. In addition to agricultural land, levee of 
Muscatine Island Levee District protects downstream 
portion of Muscatine from Mississippi River floods. 
Area is shown on topographic maps of Geological 
Survey. 
Existing project. Modification of existing levees in the 
two districts to provide increased protection to area 
from floods on Mississippi River and Michael Creek. 
Project also includes a railroad closure structure, 
ramping of roads, and a new pumping plant. See table 
27-C for authorizing legislation. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Construction of 
south flank levee and pumping plant was completed. 
Condition at end of fiscal year. Construction began in 
August 1959 and all work was completed in October 
1969. 
20. RED ROCK DAM AND LAKE RED 
ROCK, IOWA 
Location. On Des Moines River, Iowa, chiefly in 
Marion County, but extending into Jasper, Warren, 
and Polk Counties. Dam (Howell site) is 142.9 miles 
above mouth of Des Moines River, which empties into 
Mississippi River at mile 361.4 above mouth of Ohio 
River. City of Des Moines lies northwesterly from site, 
about 60 miles upstream. Area is shown on aeronautical 
maps of Coast and Geodetic Survey. 
Existing project. Provides for a dam consisting of a 
rolled earth-fill embankment and gravity-type concrete 
spillway with crest gates, located near center of 
29

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
valley, each end of which is tied into embankment by a 
gravity-type nonoverflow concrete section. The dam, at 
crest elevation of 797 feet above mean sea level, is about 
5,676 feet long and maximum height of 110 feet. Gated 
spillway is of concrete founded on bedrock with crest at 
elevation 736. Full flood control level (top of crest 
gates) is at elevation 780. Spillway crest gates are 41 
feet high and 45 feet wide. Outlet works consisting of 14 
5-by 9-foot gated conduits extend through spillway 
section and discharge into spillway stilling basin. 
Nonoverflow concrete sections of dam at each end of 
spillway are gravity type, keyed into foundation rock. 
Drainage area above dam site is 12,323 square miles. 
With pool at full flood control elevation, reservoir area 
is about 65,500 acres; reservoir has a volume of 1,830, 
000 acre-feet of water at that height (1,740,000 for 
flood control and 90,000 for a permanent pool). 
Impoundment of floodwaters by reservoir results in 
materially reduced flood heights on Des Moines River 
below the dam, and also provides substantial supplementary 
benefits by reducing Mississippi River 
floods. Estimated Federal cost is $87,900,000 (July 
1970). 
Local cooperation. None required. 
Operations and results during fiscal year. Relocation and 
remedial work on county roads, bridge tie-downs, 
water supplies, and sewerage systems continued. 
Additional riprap was placed on slopes of dam. Land 
acquisition program continued. 
Condition at end of fiscal year. Construction began in 
May 1960. Dam was placed in beneficial use for 
storage of flood water in January 1969. Work remaining 
consists mainly of relocation and remedial 
items. Land acquisition in progress, 47,436 acres 
acquired in fee, and flowage easements obtained for 27, 
934 acres. 
21. ROCKFORD, ILL. 
Location. Kent Creek, a right bank tributary of Rock 
River at the city of Rockford, Winnebago County, Ill. 
Area is shown on topographic maps of U. S. Geological 
Survey. 
Existing project. Consists of channel enlargement and 
realignment, levees, and appurtenant works on North 
Branch Kent Creek and in the portion of Kent Creek 
below the confluence of the North and South Branches, 
a relief channel to divert a portion of the flood flows of 
the South Branch Kent Creek to Rock River, and 
channel improveme nts on the South Branch downstream 
from the point of diversion. Estimated cost is 
$11,200,000 (July 1970), including $1,500,000 non- 
Federal cost for lands and relocations. See table 27-C 
for authorizing legislation. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Local interests will also bear costs of 
all relocations and alterations of bridges, buildings, 
utilities, and prescribe and enforce regulations to 
prevent encroachments on improved channels and on 
ponding areas. Local interests will be requested to 
furnish assurances after a firm project plan is established. 
Operations and results during fiscal year. Preliminary 
planning continued. 
Condition at end of fiscal year. Construction not started. 
Preliminary planning in progress. 
22. ROCK ISLAND, ILL. 
Location. On left bank of Mississippi River, 482.4 
miles above mouth of Ohio River, in Rock Island 
County, Ill. 
Existing project. Local protection from Mississippi 
River floods by construction of levees, walls, closure 
structures, and modification of drainage facilities. 
Estimated project cost is $5,530,000 (June 1970), 
including $1,150,000 non-Federal cost for land and 
relocations. See table 27-C for authorizing legislation. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Preliminary 
planning continued. 
Condition at end of fiscal year. Construction not started. 
Preliminary planning in progress. 
23. SAYLORVILLE LAKE, DES MOINES 
RIVER, IOWA 
Location. Site is chiefly in Polk County, Iowa, but 
portions will extend into Dallas and Boone Counties. 
Dam will be about 213.7 miles above mouth of Des 
Moines River, and about 5 miles upstream from north 
limits of city of Des Moines. Area is shown on 
aeronautical maps of Coast and Geodetic Survey, Des 
Moines and Dubuque sections. 
Existing project. Dam will be an earth embankment 6, 
750 feet long at crest with a height of 105 feet. Outlet 
works will be a single circular concrete conduit, 22 feet 
in diameter, located at toe of west bluff. Control 
structure will be at upstream end of conduit and house 
three gates. A stilling basin will be provided to dissipate 
energy of discharge from outlet conduit. Spillway will 
be in west bluff, weir to be 430 feet long. Water flowing 
over spillway weir will discharge into a paved chute 
and thence into a concrete stilling basin. Water will 
then travel through an excavated pilot channel to the 
river. Top of spillway will be about 31 feet below top of 
earth embankment section, and flow over weir will be 
uncontrolled when water in reservoir reaches its crest. 
Watershed area above damsite is 5,823 square miles. 
With pool at spillway crest elevation, reservoir area will 
be 16,700 acres and contain about 676,000 acre-feet of 
water at that height (602,000 for flood control and 74, 
000 for a conservation pool to maintain minimum flows 
at downstream points). Reservoir will supplement 
capacity of downstream Lake Red Rock at river mile 
142.9. The two reservoirs will provide a large degree of 
830

ROCK ISLAND, ILL., DISTRICT 
flood protection to lower Des Moines River Valley. 
Reaches along Mississippi River downstream from 
mouth of Des Moines River will also be benefited. 
Estimated Federal cost is $58,550,000 (July 1970), 
including $550,000 as a cash contribution from the 
state of Iowa. See table 27-C for authorizing legislation. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Construction of 
stage II, consisting of concrete spillway and outlet 
works, was continued. Remedial works to provide flood 
protection from reservoir operation to Polk City, 
situated in Big Creek Valley, were started: All right-ofway 
was acquired and construction under the initial 
contract was begun. Preliminary planning for various 
features was continued. 
Condition at end of fiscal year. Construction began in 
June 1965. Earth embankment portion of dam 
partially completed, and spillway and outlet works in 
progress. Construction of remedial works in Big Creek 
Valley initiated. Land acquisition in progress, 18,012 
acres acquired in fee. 
24. SNY BASIN, ILL. 
Location. In basin of the Sny, a former by-channel of 
Mississippi River, in Pike, Adams, and Calhoun 
Counties, Ill., about 260.9 to 315.4 miles above mouth 
of Ohio River. Major tributaries of the Sny are 
McCraney, Hadley, Kiser, Six Mile, and Bay Creeks. 
Area is shown on topographic maps of Geological 
Survey. 
Existing project. Plan for reduction of interior flooding 
within the Sny bottom lands, including two retardingdesilting 
reservoirs for Pigeon Creek and Horton- 
Dutch Creeks; three diversion channels for McCraney- 
Hadley Creeks, Kiser Creek, and Six Mile-Bay Creeks 
to conduct runoff directly to Mississippi River; three 
pumping stations; a closing levee at mouth of the Sny; 
aqueducts or culverts for drainage which would 
otherwise be blocked; and improvement of certain 
reaches of the Sny channel to collect bottom land 
runoff. See table 27-C for authorizing legislation. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Repair of erosion 
and damage to aqueducts, caused by heavy rains, was 
continued. 
Condition at end of fiscal year. Construction began in 
August 1959 and the project was operational in July 
1967. Only repair work on aqueducts remains to 
complete the project. 
25. WATERLOO, CEDAR RIVER, IOWA 
Location. Both banks of Cedar River in Black Hawk 
County, Iowa. 
Existing project. Local protection from Cedar River 
and Black Hawk Creek floods to be provided by 
construction of levees, floodwalls, pumping plants, and 
closure structures on both sides of Cedar River and 
Black Hawk Creek. Estimated project cost is $25,060, 
000 (July 1970), including $6,260,000 non-Federal 
costs for rights-of-way and relocations. See table 27-C 
for authorizing legislation. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Local interests will also provide 
relocations and obtain legal control over pondage 
areas. Assurances of local cooperation were accepted 
on October 2, 1969. 
Operations and results during fiscal year. Preliminary 
planning continued. 
Condition at end of fiscal year. Construction not started. 
Preliminary planning in progress. 
26. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Federal flood-control regulations (part 208 of title 
33, Code of Federal Regulations) provide that the 
structures and facilities constructed by the United 
States for local flood protection shall be continuously 
maintained in such a manner and operated at such 
times and for such periods as may be necessary to 
obtain the maximum benefits. Fiscal year costs were 
$10,000. (See table 27-D on inspection of completed 
flood control projects.) 
27. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 27-E. 
28. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 
858, 80th Congress, as amended (preauthorization) 
See table 27-F. 
Emergency flood control activities-repairf,l ood fighting, and 
rescue work (Public Law 99, 84th Cong., and antecedent 
legislation) 
See table 27-G. 
Snagging and clearing of navigable streams and tributaries in 
interest of flood control (sec. 208 of 1954 Flood Control Act, 
Public La, 780, 83d Cong.) 
Cutting a new channel about 1,000 feet in length on 
the Skunk River in Steady Run Township, Keokuk 
County, Iowa, to by-pass a reach obstructed by drift 
and debris, was started in September 1969 and 
completed in January 1970. Cost during the fiscal year 
was $40,195. 
831

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
GENERAL INVESTIGATIONS 
29. SURVEYS 
Navigation and flood control studies cost $255,050 
for fiscal year 1970. Fiscal year costs for Upper 
Mississippi River Basin study were $17,386. 
30. COLLECTION AND STUDY OF BASIC 
DATA 
Collection and study of basic data for flood plain 
information studies were made during the fiscal year at 
a cost of $127,377. (See table 27-H on completed flood 
plain studies.) 
31. RESEARCH AND DEVELOPMENT 
Collection and study of hydrologic data, including 
storm and sedimentation studies, continued. Hydrologic 
studies during fiscal year cost $8,891. Engineering 
studies on paint tests, corrosion mitigation 
studies, and ice jams cost $114,365. 
832

ROCK ISLAND, ILL., DISTRICT 
TABLE 27-A 
See 
Section 
in Text Project 
1 Illinnis and 
Funding 
New Work 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
Mississippi Canal, Approp. $ - $ - $ - $ - $ 7,605,1431 
Ill. Cost - - - - 7,605,143 
Maint. 
Approp. 208,700 -89,000 134,000 197,310 11,228,1392 
Cost 104,032 205,826 133,260 125,458 11,102,298 
2. Mill Creek and New Work 
South Slough at Approp. - - - - 63,7193 
Milan, Ill. Cost - - - 63,7193 
Maint. 
Approp. 4,900 4,900 2,900 4,223 161,553 
Cost 6,113 11,928 365 6,037 160,832 
4. Quincy, Ill., New Work 
Harbor Access Approp. - - 38,166 -2,689 35,477 
Channel (Regular Cost - - 9,213 26,264 35,477 
Funds) 
(Contributed Funds) New Work 
Contrib. - - 35,000 350 35,350 
Cost - - - 35,350 35,350 
6. Ames Lake, Skunk New Work 
River, Iowa Approp. 915,000 150,000 - -324,000 1,011,000 4 
Cost 278,573 731,216 -263,014 86,489 1,024,229 
7. Central City Lake, New Work 
Upper Mississippi Approp. -5,000 - 1,000 - 56,000 
River Basin, Iowa Cost 273 7,227 3,201 476 55,664 
8. Clinton, Iowa New Work 
Approp. - - - 30,000 30,000 
Cost - - - 23,612 23,612 
9. Coralville Lake, New Work 
Upper Mississippi Approp. 75,000 44,840 5,000 10,000 17,289,388 
River Basin, Iowa Cost 381,000 22,416 36,859 44,223 17,289,301s 
Maint. 
Approp. 207,900 172,900 227,600 302,335 2,343,905 
Cost 191,970 245,638 214,008 289,569 2,312,660 
10. Des Moines, Iowa New Work 
(Regular Funds) Approp. 810,000 700,000 1,288,000 -150,000 3,270,000 
Cost 1,003,548 616,513 28,168 48,291 2,106,293 
(Contributed Funds) New Work 
Contrib. 7,600 2,410 7,220 4,930 22,160 
Cost - 10,010 - - 10,010 
11. Dubuque, Iowa New Work 
(Regular Funds) Approp. 125,000 900,000 1,500,000 2,050,000 4,825,000 
Cost 123,342 198,525 2,108,399 2,050,636 4,710,580 
(Contributed Funds) New Work 
Contrib. - 77,000 - 63,500 140,500 
Cost - - 37,370 39,630 77,000 
12. Freeport, Ill. New Work 
Approp. 57,000 128,000 230,000 - 679,529 
Cost 69,847 78,145 65,505 113,686 578,660 
13. Fulton, 1. New Work 
Approp. - - - 30,000 30,000 
Cost - - - 19,076 19,076 
14. Gregory Drainage New Work 
District, Mo. Approp. - 125,000 825,000 563,000 1,625,300 
(Regular Funds) Cost 15,475 26,249 297,842 803,949 1,237,526 
(Contributed Funds) New Work 
Contrib. - 8,700 11,926 - 20,626 
Cost - - - 20,626 20,626 
833 
1

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 27-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
15. Hunt Drainage NNeeww WWoorrkk 
District and Lima 
Lake Drainage 
District, Ill. 
16. Indian Grave 
Drainage District, 
Ill. 
17. Iowa River-Flint 
Creek Levee District 
No. 16, Iowa 
18. Marshalltown, Iowa 
River, Iowa 
19. Muscatine Island 
Levee District and 
Muscatine-Louisa 
County Drainage 
District No. 13, 
Iowa 
(Regular Funds) 
(Contributed Funds) 
20. Red Rock Dam and 
Lake Red Rock, Iowa 
21. Rockford, Ill. 
22. Rock Island, Ill. 
23. Saylorville Lake, 
Des Moines River, 
Iowa 
(Regular Funds) 
(Contributed Funds) 
24. Sny Basin, Ill. 
25. Waterloo, Iowa 
$ 200,000 $ 80,000 $ 353,000 $ 1,081,000 
19,747 40,960 176,331 534,156 
638,000 1,100,000 1,164,000 
340,480 1,203,446 1,171,548 
139,845 
160,124 
100,000 
72,302 
3,000 
32,214 
220,000 
95,585 
98,455 
95,000 
103,608 
10,422 
200,000 
111,244 
500,000 524,000 
395,321 506,952 
277,000 
417,107 
25,000 
26,016 
11,000 
125,944 
-32,000 
85,002 
$4,259,690 
3,250,460 
3,510,000 
3,363,964 
5,207,845 
5,199,948 
461,000 
461,000 
3,298,353 
3,291,691 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
124,415 
9,400,000 8,745,000 5,522,000 1,615,000 
11,041,396 9,672,280 5,211,912 3,251,574 
24,700 
24,441 
75,000 
72,790 
50,000 
6,556 
100,000 
27,639 
85,693 
84,164 
145,000 149,000 
81,376 72,898 
150,000 150,000 
107,910 194,587 
4,410,000 5,235,000 5,000,000 3,078,000 
4,594,044 5,360,220 3,038,200 3,582,111 
- - 550,000 - 
68,000 
573,719 
100,000 
47,329 
149,000 
150,303 
200,000 
190,206 
25,000 
129,461 
194,000 
198,408 
25,000 
61,758 
36,000 
94,057 
83,445,300 
83,270,095 
110,393 
108,605 
344,000 
160,830 
550,000 
443,842 
22,238,000 
20,669,433 
550,000 
13,869,934 
13,822,605 
530,000 
530,000 
1. Includes $25,000 Emergency Relief Funds. 
2. Includes $4,143,282 for Operating and Care under the 
"Permanent Indefinite Appropriation," and $1,975,000 under 
the repair and modification program. 
3. Includes $85.00 for previous project. 
4. Includes $776,000 for disbursement in connection with 
realignment of Interstate Highway 35. 
5. Includes cost of Mehaffey Bridge, $1,365,074 (excluding 
$100,000 contributed funds). 
834 
220,000 
220,000

ROCK ISLAND, ILL., DISTRICT 
TABLE 27-B OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Squaw Chute at Quincy, Ill.1 1967 $ 70,979 $ 
1. Completed. Authorized by Chief of Engineers under sec. 
107, 1960 River and Harbor Act. Construction costs exclude 
$25,851 contributed funds expended for new work. 
835

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 3, 1930 
July 14, 1960 
(Section 107) 
October 2, 1965 
June 28, 1938 
MILL CREEK AND SOUTH SLOUGH AT MILAN, ILL. 
(See Section 2 of Text) 
Existing project adopted. 
QUINCY, ILL., HARBOR ACCESS CHANNEL (See Section 4 of Text) 
Funds appropriated for small river and harbor projects 
not specifically authorized by Congress. 
AMES LAKE, SKUNK RIVER, IOWA (See Section 6 of Text) 
Existing project adopted. 
CENTRAL CITY LAKE, UPPER MISSISSIPPI RIVER BASIN, IOWA 
(See Section 7 of Text) 
Project made eligible for selection as a unit of general 
comprehensive plan for flood control and other purposes 
in the Upper Mississippi River Basin. 
Rivers and Harbors Committee 
Doc. 1, 71st Cong., 2d sess. 
None 
H. Doc. 166, 89th Cong. 
Flood Control Committee Doc. 1, 
75th Cong., 1st sess. 
August 13, 1968 
June 28, 1938 
July 14, 1960 
December 22, 1944 
October 27, 1965 
October 23, 1962 
June 22, 1936 
August 13, 1968 
October 23, 1962 
September 3, 1954 
September 3, 1954 
September 3, 1954 
October 27, 1965 
CLINTON, IOWA (See Section 8 of Text) 
Existing project adopted. H. Doc. 348, 90th Cong., 2d sess. 
CORALVILLE LAKE, UPPER MISSISSIPPI RIVER BASIN, IOWA 
(See Section 9 of Text) 
Project made eligible for selection as a unit of general 
comprehensive plan for flood control and other purposes 
in the Upper Mississippi River Basin. 
Highway bridge across Coralville Lake at or near the 
Mehaffey site. 
DES MOINES, IOWA (See Section 10 of Text) 
Existing project adopted. 
Elimination of requirement that local interests bear expense 
of repairs and provision of gates on existing drains. 
DUBUQUE, IOWA (See Section 11 of Text) 
Existing project adopted. 
FREEPORT, ILL. (See Section 12 of Text) 
Existing project adopted. 
Flood Control Committee Doc. 1, 
75th Cong., 1st sess. 
None 
H. Doc 651, 78th Cong., 2d sess. 
None 
H. Doc. 450, 87th Cong. 
Special report in Office, 
Chief of Engineers 
FULTON, ILL. (See Section 13 of Text) 
Existing project adopted. H. Doc. 348, 90th Cong., 2d sess. 
GREGORY DRAINAGE DISTRICT, MO. (See Section 14 of Text) 
Existing project adopted. 
HUNT DRAINAGE DISTRICT AND LIMA LAKE DRAINAGE DISTRICT, 
ILL. (See Section 15 of Text) 
Existing project adopted. 
INDIAN GRAVE DRAINAGE DISTRICT, ILL. (See Section 16 of 
Text) 
Existing project adopted. 
IOWA RIVER-FLINT CREEK LEVEE DISTRICT NO. 16, IOWA 
(See Section 17 of Text) 
Existing project adopted. 
MARSHALLTOWN, IOWA RIVER, IOWA (See Section 18 of Text) 
Existing project adopted. 
H. Doc. 564, 87th Cong., 2d sess. 
H. Doc. 281, 83d Cong. 
H. Doc. 281, 83d Cong. 
H. Doc 281, 83d Cong. 
H. Doc 166, 89th Cong. 
836 
TABLE 27-C

TABLE 27-C (Cont'd) 
ROCK ISLAND, ILL., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
MUSCATINE ISLAND LEVEE DISTRICT AND MUSCATINE-LOUISA 
COUNTY DRAINAGE DISTRICT NO. 13, IOWA (See Section 
19 of Text) 
September 3, 1954 Existing project adopted. H. Doc. 281, 83d Cong. 
RED ROCK DAM AND LAKE RED ROCK, IOWA (See Section 20 
of Text) 
June 28, 1938 Project made eligible for selection as a unit of general Flood Control Committee Doc. 1, 
comprehensive plan for flood control and other purposes 75th Cong., 1st sess. 
in the Upper Mississippi River Basin. 
ROCKFORD, ILL. (See Section 21 of Text) 
October 23, 1962 Existing project adopted. S. Doc. 142, 87th Cong. 
ROCK ISLAND, ILL. (See Section 22 of Text) 
October 23, 1962 Existing project adopted. H. Doc 564, 87th Cong. 
SAYLORVILLE LAKE, DES MOINES RIVER, IOWA 
(See Section 23 of Text) 
July 3, 1958 Existing project adopted. S. Doc. 9, 85th Cong. 
SNY BASIN, ILL. (See Section 24 of Text) 
July 24, 1946 Existing project adopted. H. Doc 713, 79th Cong., 2d sess. 
WATERLOO, CEDAR RIVER, IOWA (See Section 25 of Text) 
October 27, 1965 Existing project adopted. H. Doc. 166, 89th Cong. 
837

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 26 of Text) 
Project 
Sabula, Mississippi River, Iowa 
Government levee on Duck Creek, Bettendorf, Iowa 
Government levee upstream from lock and dam No. 18, 
Mississippi River 
Des Moines and Mississippi Levee District No. 1, Mo. 
Gregory Drainage District, Mo. 
Remedial works at lock and dam No. 20, Mississippi River 
Canton, Mo. 
Elkport, Turkey River, Iowa 
Galena, Galena River, Illinois 
Penny Slough, Rock River, Illinois 
Alpine Dam, Rockford, Illinois 
Kishwaukee River at DeKalb, Illinois 
Avon Station remedial works, Des Moines, Iowa 
Des Moines, Iowa 
Van Meter, Iowa 
Drury Drainage District, Illinois 
Muscatine, Iowa (Mad Creek) 
Muscatine Island Levee District and Muscatine-Louisa 
County Drainage District No. 13, Iowa 
Subdistrict No. 1 of Drainage Union No. 1 and Bay 
Island Drainage and Levee District No. 1, Illinois 
Iowa River-Flint Creek Levee District No. 16, Iowa 1 
Henderson County Drainage District No. 1, Illinois 
Henderson County Drainage District No. 2, Illinois 
Henderson County Drainage District No. 3, Illinois 
Green Bay Levee and Drainage District No. 2, Iowa 
Hunt Drainage District and Lima Lake Drainage District, Ill. 
Indian Grave Drainage District, Illinois1 
Union Township Drainage District, Mo. 
Fabius River Drainage District, Mo. 
South River Drainage District, Mo. 
South Quincy Drainage and Levee District, Ill. 
Marion County Drainage District, Mo. 
Bear Creek at Hannibal, Mo. 
Sny Island Levee Drainage District, Illinois 
The Sny Basin, Illinois 
Penny Slough, Rock River, Illinois 
Okabena Creek, Worthington, Minn. 
838 
TABLE 27-D 
Date 
Inspected 
January 1970 
January 1970 
January 1970 
January 1970 
January 1970 
January 1970 
January 1970 
January 1970 
January 1970 
January 1970 
January 1970 
January 1970 
January 1970 
January 1970 
January 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
February 1970 
April 1970 
April 1970 
1. Project partially completed. Completed portions have been turned over to local interests for maintenance and operation.

ROCK ISLAND, ILL., DISTRICT 
TABLE 27-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Bear Creek at Hannibal, Mo.1 1962 $1,670,632 $ - 
Bettendorf, Iowa 1969 
Campbells Island, Mississippi River, I1. 5 1969 76,664 
Canton, Mo. 1 1964 1,496,555 
Carroll County Levee and Drainage 
District No. 1, Ill.3 1938 
Des Moines and Mississippi 
Levee District No. 1, Mo.1 1969 1,492,016 
Drury Drainage District, Ill.1 1964 1,144,875 
East Moline, Ill. 1969 - 
Elkport, Turkey River, Iowa1 1951 34,200 
Fabius River Drainage District, Mo.1 1941 60,500 
Fabius River Drainage District, Mo.1 1963 1,621,841 
Galena, Galena River, I11.1 1952 844,100 
Green Bay Levee and Drainage 
District No. 2, Iowa1 1949 299,000 
Green Bay Levee and Drainage 
District No. 2, Iowa1 1967 1,727,711 
Green Island Levee and Drainage 
District No. 1, Iowa3 1938 - 
Gregory Drainage District, Mo. 1 1940 77,100 
Gregory Drainage District, Mo. 2 ,6 1964 68,213 
Hannibal, Mo.6 1966 110,933 
Henderson County Drainage 
District No. 1, 11l. 1968 1,453,217 
Henderson County Drainage 
District No. 2, Ill.' 1968 1,043,902 
Henderson County Drainage 
District No. 3, Ill.' 1949 42,700 
Henderson River, Ill. 7 1964 102,310 
Janesville and Indian Ford Dams, Wis.5 1938 - 
Keithsburg Drainage District, Ill.3 1938 - 
Kishwaukee River at DeKalb, I11.1,2 1957 123,300 
Marion County Drainage District, Mo.1 1967 873,748 
Milan, Ill. 1969 - 
Muscatine, Iowa (Mad Creek)' 1962 1,169,042 
New Hartford, Iowa2 6 1966 26,530 
Okabena Creek at Worthington, Minn.1' 2 1957 72,432 
Pecatonica River at Darlington, Wis. 
Penny Slough, Rock River, Ill.1 1940 85,800 
Rochester Reservoir, Upper 
Mississippi River Basin, 
Iowa 4 
Rock River agricultural levees, Ill. 
Rock River, Ill. and Wis., at 
South Beloit, Ill. 4 1952 - 
Sabula, Mississippi River, Iowa1 1958 411,915 
Sny Island Levee Drainage 
District, Ill. ' 1942 61,400 
Sny Island Levee and Drainage 
District, Ill. 1 1968 4,935,268 
839

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 27-E (Cont'd) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
South Quincy Drainage and 
Levee District, Ill.1 1940 $ 61,200 $ 
South Quincy Drainage and 
Levee District, Ill.1 1968 1,231,243 
South River Drainage District, Mo. 1 1941 55,300 
South River Drainage District, Mo. 1 1966 1,103,431 
Subdistrict No. 1 of Drainage 
Union No. 1 and Bay Island 
Drainage and Levee District 
No. 1, Ill.1 1967 3,306,695 
Union Township Drainage District 
levee, Upper Mississippi 
River Basin, Mo.1 1947 109,621 
Upper Mississippi River 
Basin (Rock Island District) 1967 - 
Van Meter, Iowa1 
,2 1965 113,842 
1. Completed. 6. Planning discontinued because of lack of local support. 
2. Authorized by Chief of Engineers (sec. 205, 1948 Flood 7. Authority for the Henderson River diversion unit has 
Control Act, as amended). expired; the levee along the north bank of the Henderson River 
3. Inactive; lowlands of district acquired by United States in has been found to lack economic justification, and the Cedar 
1947. Creek channel improvement has been deferred for restudy. 
4. To be restudied. 
5. Inactive; project not economically justified. 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
Flood Control Activities pursuant to section 205, Public Law 858, 
80th Congress, as amended (preauthorization) 
TABLE 27-F (See Section 28 of Text) 
Fiscal Year 
Study Identification Costs 
Anamosa, Iowa $22,315 
Burlington, Iowa 4,495 
Evansdale, Iowa 7,361 
Independence, Iowa 11,271 
Jackson, Minn. 2,651 
Mad Creek at Muscatine, Iowa 11,523 
Meredosia Levee and Drainage District, Illinois 4,807 
Ralston Creek at Iowa City, Iowa 10 
Union Township Drainage District, Mo. 1,995 
Whitewater Creek, Wisc. 16,567 
840

ROCK ISLAND, ILL., DISTRICT 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
Emergency flood control activities-repair, flood fighting, and rescue work 
(Public Law 99, 84th Cong., and antecedent legislation) 
(See Section 28 of Text) 
Project Federal Cost 
Advance preparation $ 22,429 
Flood emergency operations 160,719 
Rehabilitation: 
Miscellaneous investigations 11,139 
Pecatonica River, Stephenson County, Illinois 14,598 
Iowa River-Flint Creek Levee District No. 16, Iowa 57,177 
Mississippi-Fox Drainage District No. 2, Mo. 10,426 
FLOOD PLAIN STUDIES COMPLETED 
TABLE 27-H (See Section 30 of Text) 
Requesting Date Federal 
Location Agency Completed Cost 
Black Hawk Creek. State of Iowa Dec. 1968 $19,313 
Black Hawk County, Iowa 
Cedar River, 
Black Hawk County, Iowa 
Cedar River, 
Linn County, Iowa 
Cedar River and tributaries, 
Austin, Minnesota 
Des Moines River, 
Des Moines, Iowa 
Duck Creek, 
Scott County, Iowa 
Indian and Dry Creeks, 
Linn County, Iowa 
Mississippi River, 
Cassville, Wis. 
Mississippi River, Scott and 
Muscatine Counties, Iowa, 
and Rock Island County, Ill. 
North Raccoon River, 
Sac City, Iowa 
Prairie Creek, 
Linn County, Iowa 
Rock River, 
Beloit, Wis. 
Rock River, 
Janesville, Wis. 
Rock River, 
Rock Island County, Ill. 
Rock River, 
Winnebago County, Ill. 
Skunk River and Squaw Creek, 
Story County, Iowa 
Turtle Creek, 
Rock County, Wis. 
State of Iowa 
State of Iowa 
State of Minnesota 
State of Iowa 
State of Iowa 
State of Iowa 
State of Wisconsin 
State of Iowa 
State of Illinois 
State of Iowa 
State of Iowa 
State of Wisconsin 
State of Wisconsin 
State of Illinois 
State of Illinois 
State of Iowa 
State of Wisconsin 
June 1970 
Dec. 1967 
June 1969 
June 1970 
Sept. 1965 
Dec. 1964 
June 1969 
June 1969 
June 1970 
Mar. 1966 
June 1968 
June 1968 
June 1969 
June 1970 
June 1966 
Feb. 1968 
16,960 
47,265 
59,347 
12,758 
21,307 
17,884 
10,868 
13,076 
18,753 
16,419 
14,450 
17,884 
23,178 
22,346 
15,824 
22,218 
841 
TABLE 27-G

MISSISSIPPI RIVER BETWEEN MISSOURI RIVER 
AND MINNEAPOLIS, MINN.* 
Section of river covered in this report is divided into 
three reaches, under supervision and direction of 
district engineers at St. Louis, Rock Island, and St. 
Paul. Section in St. Louis District extends 105 miles 
from mouth of Missouri River to mile 300 above Ohio 
River; Rock Island District extends about 314 miles 
from mile 300 to 614; and St. Paul District extends 
about 244 miles from mile 614 to Soo Line Railroad 
bridge, Minneapolis. 
Location. Mississippi River rises in northern part of 
Minnesota, flows about 2,360 miles southerly and 
empties into Gulf of Mexico. Portion included in this 
report extends about 663 miles from mouth of Missouri 
River to Soo Line Railroad bridge, Minneapolis. 
Latest map and profile showing this section of river is in 
House Document 669, 76th Congress, 3d session. A 
map showing Lake Pepin is in House Document 511, 
79th Congress, 2d session. A map of section Minneapolis 
to Dubuque is in House Document 515, 79th 
Congress, 2d session. A map showing location of 
drainage districts (Bellevue, Iowa, to Missouri River) is 
in Rivers and Harbors Committee Document 34, 75th 
Congress, 1st session. 
Previous projects. See page 1199 of Annual Report for 
1963. 
Existing project. Provides for a channel of 9-foot depth 
and adequate width between mouth of Missouri River 
(1,179 miles from the gulf) and Soo Line Railroad at 
Minneapolis, by construction of a system of locks and 
dams, supplemented by dredging. Project also provides 
for further improvements at St. Paul to provide a basin 
extending downstream from Robert Street Bridge for 
2.7 miles, and at Minneapolis to provide adequate 
terminal facilities, and for other harbor improvements 
and miscellaneous work. Pertinent data for existing 
and proposed locks and dams, harbors, etc., are given 
in tables below. All dams are concrete. Three dams 
(Upper St. Anthony Falls, 1 and 19) are fixed, 
remainder are movable. Estimated cost for new work 
(1970) is $486,766,000, exclusive of amounts expended 
on previous projects. See House Document 669, 76th 
Congress, 3d session, for a report of Chief of Engineers 
dated February 27, 1940, containing a general plan for 
improvement of Mississippi River between Coon 
Rapids Dam and mouth of Ohio River for purposes of 
navigation, power development, flood control, and 
irrigation needs. (See tables 28-C, 28-D, 28-E, and 28- 
G on locks and dams; harbor improvements; additional 
features entering into cost of project; and 
authorizing legislation.) 
Local cooperation. Small-boat harbors authorized in 
the River and Harbor Act of 1962 are subject to 
conditions that local interests make a cash contribution 
toward cost of construction (except in case of Quincy 
harbor which involves maintenance only of an existing 
harbor); furnish lands and rights-of-way for construction 
and future maintenance; hold the United 
States free from damages; provide and maintain 
mooring facilities and utilities; reserve accommodations 
for transient small boats; accomplish all 
necessary relocations or alterations; and establish 
public bodies empowered to regulate use, growth, and 
development of harbors. 
The Fort Madison commercial harbor is subject to 
conditions that local interests furnish all lands and 
rights-of-way, including spoil areas and retaining 
works; hold the United States free from damages; 
provide and maintain public terminals and transfer 
facilities; provide and maintain depths in berthing 
areas and in local access channels; and accomplish 
utility or other relocations or alterations. 
Local cooperation requirements for improvement of 
commercial harbor at Dubuque, Iowa; for improvement 
of Beaver Slough at Clinton, Iowa, for 
navigation; and for general navigation facilities at 
small-boat harbors at Rock Island, Ill.; Hannibal, 
Mo.; Fort Madison, Iowa; Davenport (Lindsay Park), 
Iowa; Muscatine, Iowa (including freight terminal 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
843

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
approach channel); Andalusia, Ill.; Warsaw, Ill.; and 
Moline, Ill. have been complied with. 
Licenses. Federal Power Commission collects from 
non-Federal licensees annually to recompense the 
United States for use of Government dams for 
generation of hydroelectric power. Amounts collected 
are returned to U.S. Treasury. (See table at end of 
chapter for license fees collected through fiscal year 
1970.) 
Terminal facilities. Considered adequate for existing 
commerce. 
Operations and results during fiscal year. St. Paul District, 
new work: Payment of a contractor's claim on the St. 
Anthony Falls, Minn., project was made on June 30, 
1970 in the amount of $13,642. Office administration 
costs amounted to $358. Detailed designs were initiated 
for a breakwater addition at the Pepin small-boat 
harbor, Wis., project to correct a design deficiency at a 
cost of $4,885. 
Public-use facilities: Work on Master Plans and 
land-use maps continued, and plans and specifications 
were prepared for recreational facilities at Jays Lake 
Landing in Pool 10 at a cost by hired labor of $12,059. 
A construction contract was awarded on June 29, 1970 
for this work. 
Total Federal costs by contract $13,642; by hired 
labor $17,302. 
Maintenance: Channel dredging to remove shoal 
areas was performed. Government pipeline dredge 
William A. Thompson removed 2,143,237 cubic yards of 
material at 28 locations at a cost of $635,930.. 
Government derrickbarge No. 767 removed 172,168 
cubic yards of material at 12 locations for $206,845. 
Contract dredging was completed in Pool 1 on 8 
August 1969 with 67,450 cubic yards of dredge 
material being removed at a cost of $41,473. Miscellaneous 
surveys, reports, and other work was carried 
on by hired labor for $29,201. Total cost of maintenance 
was $913,449. 
Operating and care: Locks and dams were operated 
as required and necessary repairs were made to those 
and appurtenant structures. Scour damage repair to 
the cutoff wall and repairs to the access road and 
parking area, damaged by flood, were made at Lock 
and Dam No. 2. Repairs were made to dwellings and 
buildings. Total cost of operating and care was $2,600, 
956. 
Rock Island District, New Work: Planning for 
small-boat harbor at Moline, Ill., was continued at a 
cost of $209. Planning for commercial harbor at Fort 
Madison, Iowa, was performed at a cost of $22,959. 
Rock excavation in Pool No. 16 in vicinity of Horse 
Island and Crescent Bridge was performed at a cost of 
$803,987. Planning and construction of recreational 
facilities, consisting of boat-launching ramps, parking 
areas, picnic tables, access roads, and fireplaces were in 
progress at a cost of $19,373. 
Maintenance: Hired labor forces performed maintenance 
activities as follows: Channel dredging was 
performed at 14 locations by U. S. pipeline dredges 
Thompson and Kennedy, a total of 1,016,376 cubic yards 
of material having been removed at a cost of $279,055. 
Regulating work consisting of removal of wing dams in 
vicinity of Credit Island and Horse Island and 
construction of deflecting dams above Lock and Dam 
No. 21 was performed at a cost of $156,146. Redecking 
of service bridge at Dam No. 21 was continued at a cost 
of $13,403. Service bridges and dam gates were 
sandblasted and painted at a cost of $50,719 at Lock 
and Dam No. 20. Repair of damage caused by 
towboats to lock and dam structures was performed at a 
cost of $32,762. Maintenance of small-boat harbors was 
performed at a cost of $10,372. Maintenance of 
recreational facilities was performed at a cost of $40, 
577. Winter overhaul of Lock No. 21 was commenced 
and completed during the fiscal year at a total cost of 
$160,648. Repair of roller gate guard rails at Dam No. 
22 was commenced and completed during the fiscal 
year at a total cost of $43,380. Condition surveys were 
made at Locks Nos. 11, 12, and 13 at a cost of $19,409. 
Other maintenance activities were performed at a cost 
of $483,119. 
Operating and care: Locks and dams were operated 
as required and necessary repairs were made thereto 
and to appurtenant structures at a cost of $2,559,048. 
Income and credits to operation were -$10,395. 
St. Louis District, new work. Costs for planning of 
recreation facilities in Pool No. 24 were $1,684 for 
engineering and design, and $199 for supervision and 
administration. There were no costs in Pool 25. Costs 
for recreation facilities in Pool No. 26 were -$1,344 for 
construction costs of Michael's Landing, $281 for 
engineering and design, $315 for supervision and 
administration. Costs incurred for New Lock and Dam 
26 were $18,586 for engineering and design and $2,396 
for supervision and administration. 
Maintenance. Costs incurred for the year were $483, 
106 for dredging 2,152,800 cubic yards: $55,059 for 
repairs to Government structures; $87,657 for repair of 
cracks at Lock 26; $233,100 to repair electrical 
facilities at Lock 26, $104,984 for rehabilitation of Lock 
26; $7,208 for value engineering study; $15,663 for 
West Alton Public Access Road; $7,428 to replace 
mechanical equipment; $19,882 for restoration of 
structural components, Locks 24, 25, 26; $667,179 for 
permanent operating equipment; $2,544 for restoration 
of buildings and grounds; $417 for replacement 
of tools and equipment; $20,499 to replace 
storage building at Lock 26; $359,819 for dike repairs; 
$641 for gage repairs; $169,669 for engineering and 
design; and $214,056 for supervision and admininstration. 
Operating and care. The locks and dams were 
operated as required, and necessary repairs were made 
thereto and to appurtenant structures at a cost of $1, 
217,317. 
844

MISSISSIPPI RIVER BETWEEN MISSOURI AND MINNEAPOLIS MINN. 
Costs to St. Louis District were $23,715 for new work 
and $3,666,228 for maintenance for a total of $3,689, 
943. 
Condition at end of fiscal year. The 9-foot channel as a 
whole is about 89 percent complete. For information 
pertaining to locks, dams, and harbors, see tables 
"Existing Project." 
St. Paul District, work completed: Locks and dams 
at St. Anthony Falls and Nos. 1 to 10, inclusive, except 
for relatively minor appurtenant work; major improvements 
of channels and harbors at St. Paul and 
Minneapolis; commercial harbors at Lake City, Red 
Wing and Winona, Minn., and Prairie du Chien, Wis., 
small-boat harbors at St. Paul, Hastings, Red Wing, 
Wabasha, and Winona, Minn., Lansing, Iowa; and 
Bay City, Pepin and Prairie du Chien, Wis.; a remedial 
drainage ditch at Cochrane, Wis.; miscellaneous 
channel dredging and realinement; channel markers; 
pool clearing; and construction of various facilities for 
recreational use. 
Status of land flowage acquisition: Approximately 
50,293.54 acres of land in fee, including 47,305 acres 
used by Department of the Interior in accordance with 
a cooperative agreement and general plans, and 
easements of 15,549.63 acres of land are owned or 
controlled in pools 1 to 10, inclusive, at end of fiscal 
year. In addition, fee title to 12.46 acres and perpetual 
easements on 2.78 acres of land for St. Anthony Falls 
and perpetual easements over 241.97 acres of land for 
harbors have been obtained and Department of the 
Army holds special rights over 62,954.74 acres owned 
by Department of the Interior in pools Nos. 3 to 10 
inclusive. Land acquisition is complete. Work in 
progress; planning for various facilities for recreational 
use. Preparation of a design memorandum is underway 
for a breakwater addition at the Pepin small-boat 
harbor to correct a design deficiency. 
Work remaining to complete portion of project in St. 
Paul District: Guide wall extensions at Nos. 3 to 10, 
inclusive, except No. 6; realinement of channel at 
Wilds Bend; construction of small-boat harbor at St. 
Paul (Harriet Island), Minn.; remedial work at Pepin 
small-boat harbor, construction of additional recreational 
facilities and payment of contract claims for 
St. Anthony Falls. 
Condition of channel on June 30, 1970, was such 
that controlling depths of 9 feet at low water and 
minimum widths for long-haul common carrier service 
were available in all pools. Except for Lock No. 1 
which is in poor condition due to age and obsolescence, 
structures are in good condition. (See table 28-B for 
total costs of existing project to June 30, 1970.) (St. 
Paul Dist.) 
Rock Island District: Major construction items, 
including all locks and dams, are completed and in 
operation. Work remaining to complete portion of 
451-584 0-72-54 
project in Rock Island District consists of: Construction 
of guide wall extensions at Nos. 16, 18, and 21; mooring 
facilities at Nos. 11, 12, 14, 15, 16, 17, 18, and 22; upper 
approach improvement at No. 19; upper approach 
dike at No. 20; removal of remainder of lateral dam in 
pool No. 14; rock ancd/or conglomerate excavation in 
pools Nos. 14, 15, 16, 18, 19, and 21; and construction 
of eight small-boat harbors, commercial harbor at Fort 
Madison, Iowa, and additional recreational facilities. 
Status of land and flowage acquisition: Acquisition 
of land in pools Nos. 11 to 22, inclusive, consisting of 93, 
601 acres in fee and 10,541 acres in flowage easement, 
has been completed. 
The condition of the channel on June 30, 1970, was 
such that controlling depths of 9 feet at low water and 
widths suitable for long-haul common carrier service 
were being maintained in all pools. (See table at end of 
chapter for total costs of existing project to June 30, 
1970.) (Rock Island Dist.) 
St. Louis District work completed. Locks and Dams 
Nos. 24, 25, and 26 (Henry T. Rainey Dam), except for 
guide wall extensions at Locks Nos. 24 and 25, have 
been completed. For information pertaining to locks, 
dams, and harbors, see table under "Existing Project." 
Payments for rectification of damages have been 
completed. 
Status of land and flowage acquistions. Acquisition 
of lands in Pools Nos. 24, 25, 26, involving 41,451 acres 
of land in fee and flowage easements over 6,600 acres, is 
complete. 
Work remaining to complete. Construction of guide 
wall extensions at Locks Nos. 24, and 25; construction 
of recreation facilities for public use; and construction 
of 3,800 linear feet of dikes and 3,100 linear feet of 
*revetment upstream of mouth of Missouri River. 
Condition of channel on June 30, 1970 was such that 
controlling depth of nine feet at low water and 
generally suitable widths for long-haul common carrier 
services were maintained in all pools and between Lock 
and Dam No. 26 and Missouri River. Preconstruction 
planning was initiated on a new dam with two 110 by 
1200 foot locks to replace the existing Locks and Dam 
26 at Alton, Illinois. The existing locks and dam are 
badly deteriorated and are inadequate to handle 
projected increase in river traffic. The cost of the 
proposed new dam and locks is $245,000,000 (July 
1970 prices). (See table at end of chapter for total costs 
of existing project to June 30, 1970.) (St. Louis Dist.) 
Total Federal cost of existing project to end of fiscal 
year for the three districts was $355,437,462, of which 
$208,190,539 was for new work ($133,444,235 regular 
funds, $51,895,959 public works funds, and $22,850, 
345 emergency relief funds), $147,205,888 regular 
funds for maintenance, and $41,035 regular funds for 
rehabilitation. 
45

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 28-A COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
1. Mississippi River New Work 
between Missouri Approp. 467,387 471,832 1,511,500 741,715 258,805,954' 
River and Cost 332,653 553,715 1,105,604 901,187 259,104,370 
Minneapolis, Maint. 
Minnesota Approp. 6,989,480 7,401,500 9,790,315 10,974,037 167,633,1342 
(Federal Funds) Cost 7,516,757 8,566,311 9,057,895 11,018,878 166,697,3622 
Rehab. 
Approp. - - - - 41,035 
Cost - - - - 41,035 
(Contributed New Work 
Funds) Approp. 3,000 587 - - 1,224,243 
Cost 8,295 587 - - 1,224,243 
1. Includes $49,012,646 for new work on previous projects. 
2. Includes $8,472,597 for maintenance of previous 
projects. 
TABLE 28-B TOTAL COSTS OF EXISTING PROJECT TO JUNE 30, 1970 
District Cost Regular Public Work Emergency Total 
Funds Funds Relief Funds 
St. Paul New Work 1 $ 56,913,8862 $24,210,071 $ 9,071,214 $ 90,195,171 
District Maintenance3 66,339,016 - - 66,339,016 
Total 123,252,902 24,210,071 9,071,214 156,534,187 
Rock Island New Work 61,144,5694 17,403,322 11,338,865 89,886,756 
District Maintenance 62,130,5495,6 - 62,130,549 
Rehabilitation 41,035 - - 41,035 
Total 123,316,423 17,403,322 11,338,865 q 152,058,610 
St. Louis New Work 16,286,968 10,282,5667 2,440,266 29,009,800 
District Maintenance 29,755,201 - - 29,755,201 
Total 46,042,169 10,282,566 2,440,266 58,765,001 
1. Excludes $1,211,956 contributed funds. Includes $7,673 expended 
in pool No. 11. 
2. Includes $159,359 transferred from Rock Island District covering 
pro rata share of cost of derrick boat Hercules. 
3. Includes $762,196 expended between 1930 on operating and care 
of works of improvement under provisions of permanent indefinite appropriation 
for such purposes. 
4. $687,709 was transferred to St. Louis District in fiscal year 1958. 
Exiludes $201,167 transferred to St. Paul and St. Louis Districts covering 
their pro rata shares of cost of derrick boat Hercules. 
5. Costs subsequent to fiscal year 1953 included with operating 
and care. 
6. Includes $395,442 expended between 1930 and 1936 on 
operating and care of works of improvement under the provisions of 
the permanent indefinite appropriation for such purposes. 
7. Includes $47,800 transferred from Rock Island District covering 
pro rata cost of derrick boat Hercules and $687,709 transferred 
from Rock Island District. 
84t;

LOCKS AND DAMS 
Lock Dimensions 
Greatest 
P 
Width Length Upper Depth on Co 
Lock Milesfof Avail- Lift Normal Miter Sill Character of Foundation Above Miles from Avail- Lift P 
Dam Ohio Nearest Town her able (feet) Eleva- Upper Lower Lock Dam I 
River (feet) for Full tion 
I 
(feet) (feet) an 
(feet) Width i 
(feet) 
St. Anthony 853.9 In city of Minne- 
Falls, upper apolis, Minn. 
lock 
St. Anthony 853.3 In city of Minne- 
Falls, lower apolis, Minn. 
lock and dam 
Lock and dam 1 847.6 Minneapolis- 
St. Paul 
Lock and dam 2 815.2 1.3 above Hastings, 
Minn. 
Lock and dam 3 796.9 6.1 above Red Wing, 
Minn. 
Lock and dam 4 752.8 Alma, Wis. 
-I 
Lock and dam 5 738.1 Minneiska, Minn. 
Lock and 728.5 3 above Winona, 
dam 5A Minn. 
Lock and dam 6 714.3 Trempealeau, Wis. 
Lock and dam 7 702.5 Dresbach, Minn. 
Lock and dam 8 679.2 Genoa, Wis. 
Lock and dam 9 647.9 3.3 below Lynxville, 
Wis. 
Lock and 615.1 Guttenberg, Iowa 
dam 10 
Lock and 583.0 3.7 above Dubuque, 
dam 11 Iowa 
Lock and 556.7 Bellevue, Iowa 
dam 12 
Lock and 522.5 4.3 above Clinton, 
dam 13 Iowa 
Lock and 493.3 3.7 below Le Claire, 
dam 14 Iowa 
Le Claire lock 493.1 3.9 below Le Claire, 
(Canal) Iowa 
56 400 49.2 799.2 15.7 13.7 Some limestone, Limestone 
mainly sandstone. 
No piles. 
56 400 26.95 750.0 13.7 10.35 Sandstone. No Sandstone 
piles. 
56 
56 
110 
1108 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
80 
400 35.95 
400 35.9 
500 12.2 
6008 12.2 
600 8.0 
600 7.0 
600 9.0 
600 5.5 
600 6.5 
600 8.0 
600 11.0 
600 9.0 
600 8.0 
600 11.0 
600 9.0 
600 11.0 
600 11.0 
320 11.0 
725.1 13.55 
- 12.57 
16.0 
687.2 22.2 
675.0 17.0 
667.0 17.0 
660.0 18.0 
651.0 18.0 
645.5 17.0 
639.0 18.0 
631.0 22.0 
620.0 16.0 
611.0 15.0 
603.0 18.5 
592.0 17.0 
583.0 19.0 
572.0 20.5 
- 17.6 
10.1 Rock and piles in Piles in gravel 
7.6 gravel 
15.1 Piles in sand, silt Piles in sand, silt 
13.0 and clay and clay 
14.0 Piles in sand, silt Piles in sand 
and clay 
13.0 Piles in sand and Piles in sand and 
gravel gravel 
12.0 Piles in sand Piles in sand 
and gravel 
12.5 Piles in sand Piles in sand 
12.5 Piles in sand, Piles in sand and 
gravel and silt clay 
12.0 Piles in sand and Piles in sand 
gravel 
14.0 Piles in sand, gravel, Piles in sand and 
and broken rock gravel 
13.0 Piles in sand Piles in sand 
12.0 Piles in sand Piles in sand 
12.5 Piles in sand, Piles in sand 
gravel and silt 
13.0 Piles in sand and Piles in sand and 
gravel gravel 
13.0 Piles in sand, clay Piles in sand and 
and gravel gravel 
13.5 Rock Rock 
10.9 Rock Rock 
Estimated 
ercent Year Cost of 
)mplete Opened Each Lock 
ocks, to and Dam 
Dams, Navi- Including 
d Work gation Work in V1 
Pn oolPool 
1002 - $ 18,203,0003 
100 1959 12,382,0004 . 
100 1917 2,350,0006 
100 1930 6,499,0009 
100 1948 CrJ 
82 1938 6,936,000 Z 
84 1935 5,785,000 
86 1935 6,432,000 O 
60 1936 7,496,000 
100 1936 4,892,000 
86 1937 6,507,000 
82 1937 7,353,000 
82 1938 7,840,000 
78 1936 6,089,000 
99 1937 7,410,000 
99 1938 5,562,000 
100 1938 7,502,000 
98 1939 6,166,000 
100 1922 10 
TABLE 28-C

TABLE 28-C (Cont'd) LOCKS AND DAMS 
Lock Dimensions 
Great- Estimated Gst Percent 
LMoicleks Width Length Upper Depth on Year Cost of 
Lock Above Miles from of Avail- Lift Normal Miter Sill Character of Foundation Locks Opened Each Lock and Above Miles from PoLift Locs, to and Dam 
and Ohio Nearest Town ber able (feet) Eleva- Upper Lower Lock Dam Dams,Including 
River et) for Full Eton1 (feet) (feet) and Work t Inc Width 
in Pool 
(feet) 
Lock and 482.9 Foot of Arsenal 110 600 16.0 561.0 24.011 11.0 Rock Rock 95 1934 $ 10,247,000 
dam 15 Island, Rock Island, 110 360 16.0 - 17.011 11.0 
Ill. 
Lock and 457.2 1.8 above Muscatine, 110 600 9.0 545.0 17.0 12.0 Piles in sand and Piles in sand and 95 1937 9,670,000 
dam 16 Iowa gravel gravel 
Lock and 437.1 4.2 above New Boston, 110 600 8.0 536.0 16.0 13.0 Piles in sand and Piles in sand 99 1939 5,825,000 
dam 17 Ill. gravel 
Lock and 
dam 18 410.5 6.5 above Burlington, 110 600 9.8 528.0 16.5 13.7 Piles in sand Piles in sand 90 1937 9,888,000 
Iowa 
Lock and 364.2 Keokuk, Iowa 110 358 38.2 518.2 14.0 9.2 Rock Rock 100 1913 
dam 19 110 1,200 15.0 13.0 99 1957 14,711,00012 
Lock and 343.2 0.9 above Canton, Mo. 110 600 10.0 480.0 15.0 12.0 Rock Rock and piles in 97 1936 6,230,000 
dam 20 sand and gravel 
Lock and 324.9 2.1 below Quincy, Ill. 110 600 10.5 470.0 16.5 12.0 Piles in sand and Piles in sand and 95 1938 7,924,000 
dam 21 gravel gravel 
Lock and 301.2 1.5 below Saverton, 110 600 10.2 459.5 18.0 13.8 Rock Rock 99 1938 5,257,000 
dam 22 Mo. 
Lock and 273.4 Clarksville, Mo. 110 600 15.0 449.0' 19.0 12.0 Rocks and piles in Piles in sand 81 1940 7,899,000 
dam 24 sand 
Lock and 241.4 Cap Au Gris, Mo. 110 600 15.0 434.00 19.0 12.0 Piles in sand and Piles in sand and 81 1939 10,281,000 
dam 25 gravel gravel 
Lock and 200.9 Alton, Ill. 110 1,200 24.0 419.0 20.0 15.0 Piles to bedrock Piles to bedrock 100 1938 $245, 000,000 
dam 26 110 1,200 24.0 - 20.0 15.0 
(Henry T. 
Rainey Dam) 
Total, Locks $471,160,000 
and Dams 
1. Elevatnon ot pools I to 22 and at St. Anthony Falls are mean sea level 1912 adjustment; 
pools 24, 26 are mean sea level 1929 adjustment. 
2. Includes existing dam, owned by Northern States Power Co. 
3. Includes dredging above upper lock. (Federal cost only.) 
4. Includes lower approach dredging and dredging between upper and lower rock. (Federal 
cost only.) 
5. Based on pool elevation 723.1 in pool 1 which is crest of dam. Pool is normally maintained 
at elevation 725.1 by flashboards. 
6. In addition $1,948,800 expended from previous projects and $1,349,600 from O&C 
appropriation for first of twin locks, Excludes lock and dam replacement programs. 
7. Old upper guard sill. 
8. Landward lock. 
9. In addition, $1,965,300 expended from previous projects. 
10. Existing Le Claire Canal lock is used as auxiliary to lock 14; previous project cost 
$540,000. 
11. Depth over upper poiree sill. Depth over upper miter sille is 27 feet, at lock 15. 
12. $640,868 for first lock was reported by Mississippi River Power Company, transferred 
to Government free in lieu of improvements destroyed. (Annual Report, 1928, pp. 1118-1119.) 
Present estimate includes $13,132,600 for main lock and appurtenant work. 
d
0
y
x
O
z0
v
Oj

MISSISSIPPI RIVER BETWEEN MISSOURI AND MINNEAPOLIS MINN. 
HARBOR IMPROVEMENTS 
Type 
Project Approximate size (feet) 
depth 
(feet) Width Length 
Harriet Island Harbor, 
St. Paul, Minn. 
St. Paul Harbor, Minn. 
Hastings Harbor, Minn. 
Red Wing Harbor, Minn. 
Red Wing Harbor, Minn. 
Bay City Harbor, Wis. 
Lake City Harbor, Minn. 
Pepin Harbor, Wis. 
Wabasha Harbor, Minn. 
Alma Harbor, Wis. 
Winona Harbors, Minn. 
Lansing Harbor, Iowa 
Prairie du Chien Harbor, 
Wis. 
Cassville Harbor, Wis. 
Dubuque Harbor, Iowa 
Bellevue Harbor, Iowa 
Savanna Harbor, Ill. 
Clinton Harbor, Iowa 
Moline Harbor, Ill. 
Davenport Harbor, Iowa 
(Lindsay Park) 
Rock Island Harbor, 
Ill. 
Davenport Harbor, Iowa 
(Credit Island). 
Andalusia Harbor, Ill. 
Muscatine Harbor, Iowa 
New Boston Harbor, 
Ill. 
Fort Madison Harbor, 
Iowa 
Fort Madison Harbor, 
Iowa 
Keokuk Harbor, Iowa 
840.2 In city of St. Paul 
836.5-839.2 In city of St. Paul 
839.7 Minn. Channel 
improvement. 
Small-boat harbor 
and channel enlargement 
813.2 Lower end of city of 
Hastings, Minn. 
791.4 In city of Red Wing, Minn. 
791.1 In city of Red Wing, Minn. 
785.9 Upper end of Bay City, 
Wis. 
773.0 In city of Lake City, 
Minn. 
767.1 In city of Pepin, Wis. 
760.0 Upper end of city of 
Wabasha, Minn. 
751.3 Upper end of Alma, Wis. 
726.0 In city of Winona, Minn., 
Latsch Island 
726.2 Crooked Slough 
663.3 Upper end of city of 
of Lansing, Iowa 
635.5 Upper end of city of 
Prairie du Chien, Wis. 
635.0 In Marais de St. Friol 
East Channel below 
Hwy bridges. 
606.6 At Cassville, Wis. 
579.4 At Dubuque, Iowa 
555.6 At Bellevue, Iowa 
537.3 At Savanna 
518.8 Joyce Slough 
488.0 At Moline 
484.2 At Davenport 
479.8 At Rock Island 
478.7 Credit Island Slough 
473.0 
455.5 
455.6 
Andalusia Slough 
At Muscatine 
433.1 Boston Bay 
383.7 At Fort Madison 
378.3 At Fort Madison 
363.5 At Keokuk 
Small-boat 
Commercial 
Small-boat 
Small-boat 
Commercial 
Small-boat 
Small-boat 
Small-boat 
and 
Commercial 
Small-boat 
Small-boat 
Small-boat 
Small-boat 
Commercial 
Small-boat 
Small-boat 
Commercial 
Small-boat 
Commercial 
Small-boat 
Small-boat 
Small-boat 
Small-boat 
Small-boat 
Entrance 
channel to 
small-boat 
harbor. 
Small-boat 
Small-boat 
Small-boat 
Freight terminal 
approach 
channel. 
Small-boat 
Small-boat 
Commercial 
Small-boat 
5 70 925 
9 400-1,000 2.7 (mile) 
5 0-300 400 
5 200 500 
9
5
5
5 
9
5 
5
5
5
9
5
5
9
5 
12
5
5
5
5
5 
300 1,200 
450 800 
50- 100 5,990 
400 600 
500 1,000 
50 600 
175- 400 800 
300 500 
200 1,000 
200 6,000 
170 500 
400 800 
- 1,000 ft 
frontage 
120 565 
340 1,500 
100 850 
280 910 
170 1,800 
214 687 
200 1,150 
6 100 1,100 
75 1,400 
40 435 
150 950 
200 1,890 
5 90- 135 600 
5 250 900 
200 10,300 
5 100- 160 1,015 
0 $ 80,0002 
100 217,100 
100 230,200 
100 74,300 
100 146,8003 
100 8,700 
100 39,4004 
100 93,500 
100 
100 
100 
100 
100 
100 
100 
100 
100
0 
100
0
0
0
0 
100 
215,1005 
41,700 
56,300 
89,800 
84,700 
95,300 
85,500 
93,100 
178,000 
55,200 
110,000 
108,000 
54,000 
191,000 
262,100 
100 31,000 
100 
100 
100 
90,000 
21,000 
353,000 
0 23,000 
100 184,200 
920,000 
274,000 
849 
TABLE 28-D 
Name 
Miles above 
Ohio River Location 
Percent 
complete 
Actual or 
estimated 
cost

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 28-D (Cont'd) HARBOR IMPROVEMENTS
Project Approximate size (feet) Actual or 
Miles above depth Percent estimated 
Name Ohio River Location Type (feet) Width Length complete cost 
Warsaw Harbor, Ill. 359.1 At Warsaw Small-boat 5 100 600 100 $ 73,000 
Quincy Harbor, Ill. 327.2 Quincy Bay Small-boat 5 200 300 9,000 0 6 
Hannibal Harbor, Mo. 308.8 At Hannibal Small-boat 5 180- 260 600 100 129,000 
Total $4,708,000 
1. Grafton Harbor, Ill., deferred, cost estimate $223,000. 2. In addition, local interests will contribute $80,000. 
(1966). "Harbor opposite Hamburg, Ill." portion is deferred and 
excluded from cost estimate, cost estimated at $116,000 (1960), 3. In addition, local interests contributed $3,455. 
including $5,200 for preauthorization study and $2,000 Coast 
Guard costs. "Commercial Harbor at Alton, Ill." portion is 4. In addition, local interests contributed $9,500. 
deferred and excluded from cost estimate, cost estimated at 
$306,000 (1960), including $27,000 for preauthorization study. 5. In addition, local interests contributed $15,759 and will 
"Small Boat Harbor at Alton, Ill." portion is considered inactive contribute an additional $17,000. 
and excluded from cost estimate, cost estimated at $121,000 
(1959), including $11,900 for preauthorization study and 6. Maintenance only, estimated at $5,000 annually. 
$3,000 Coast Guard costs. 
TABLE 28-E ADDITIONAL FEATURES ENTERING INTO COST OF PROJECT 
Facilities for public use, convenience, and safety $ 2,214,000 
Rectification of damages caused by seepage and backwater 5,459,7001 
Regulating works between lock and dam 26 (Henry T. Rainey 
Dam) and Missouri River 2,852,000 
Improvement of Beaver Slough at Clinton, Iowa, for 
navigation 193,600 
Miscellaneous 1,312,9002 
Total additional features 10,898,2003 
Total existing project 486,766,000 
1. Excludes $205,000 (1955) for remedial works in Sny 
Island Leeve Drainage District, Illinois, to be restudied after 
completion of Sny Basin flood control project. 
2. Includes $686,500 for repairs to Stone Arch bridge, 
Minneapolis, Minn. (FY 1970). 
TABLE 28-F LICENSE FEES COLLECT 
3. Excludes $227,000 (1965) for inactive remedial measures 
at Sandy Slough, Mo. 
TED THROUGH FISCAL YEAR 1970 
Annual Collections to 
Dam Licensee charge June 30, 1970 
St. Anthony Falls Northern States $ 3,300 $ 33,497 
Lower lock and dam Power Co. (No. 2056) 
Lock and dam No. 1 Ford Motor Co. 95,440 4,199,360 
(No. 362) 
Total project 4,232,857 
850

MISSISSIPPI RIVER BETWEEN MISSOURI AND MINNEAPOLIS MINN. 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Sept. 22, 1922 
July 3, 1930 as 
amended by P.R. No. 
10, Feb. 24, 1932 
June 26, 1934 
Aug. 30, 1935 
Aug. 26, 1937 
Aug. 30, 1935 
Aug. 26, 1937 
Dec. 22, 1944 
Mar. 2, 1945 
Mar. 2, 1945 
Mar. 2, 1945 
Mar. 2, 1945 
None 
Mar. 2, 1945 
Mar. 2, 1945 
Mar. 2, 1945 
July 24, 1946 
July 24, 1946 
July 24, 1946 
July 24, 1946 
July 24, 1946 
June 30, 1948 
May 17, 1950 
May 17, 1950 
May 17, 1950 
May 17, 1950 
May 17, 1950 
May 17, 1950 
May 17, 1950 
May 17, 1950 
May 17, 1950 
Dredging channels to landing places. 
Project adopted from Illinois River to Minneapolis; 
Chief of Engineers granted discretionary authority 
to make such modification in plan as may be deemed 
advisable. 
Operation of snag boats and operation and care of 
locks and dams to be provided for with funds from 
Department of the Army appropriations for rivers 
and harbors. 
Missouri River established as lower limit of project. 
Extension of 9-foot channel above St. Anthony 
Falls, Minn., including adequate terminal facilities 
for Minneapolis, Minn. 
St. Paul Harbor. 
Determine damages to drainage and levee districts 
caused by seepage and backwater, and cost of 
making rectification thereof. 
Public park and recreational facilities. 
Red Wing, Minn., harbor. 
Remedial works to correct damages caused by 
seepage and backwater at Cochrane, Wis. 
Such changes or additions to payments, remedial 
works, or land acquisitions authorized by River and 
Harbor Act of Aug. 26, 1937 (River and Harbor 
Committee Doc. 34, 75th Cong., 1st sess.), as Chief 
of Engineers deems advisable. 
St. Paul, Minn., channel enlargements small boat 
harbor, and roadway. 
Vertical bridge clearance at Minneapolis to 26 feet 
above estimated stage for discharge of 40,000 c.f.s. 
Winona, Minn., basin. 
Future modification of lock and dam No. 2 for 
power development. 
Provides for cash contribution by local interests 
in lieu of alteration of privately owned bridges 
and utilities for St. Anthony Falls project. 
Lake City, Minn., harbor. 
Wabasha, Minn., harbor. 
Payment of damages caused by backwater and seepage, 
pools 3 to 11. 
Hastings, Minn., harbor. 
Lansing, Iowa, harbor. 
Fort Madison, Iowa, harbors. 
Payment of damages caused by pool No. 14 at 
Clinton, Iowa. 
Davenport, Iowa, harbor. 
Muscatine, Iowa, harbor. 
Alma, Wis., harbor. 
Hannibal, Mo., harbor. 
Prairie du Chien, Wis., harbors. 
Opposite Hamburg, Ill., harbor.1 
Rock Island, Ill., harbor. 
Permits such change in location of Winona, Minn., 
small boat basin authorized by River and Harbor 
Act of Mar. 2, 1945 (H. Doc. 263, 77th Cong., 
1st sess.), as Chief of Engineers deems advisable. 
None 
H. Doc. 290, 71st Cong., 2d sess. 
None. 
H. Doc. 137, 72d Cong., 1st sess. 
H. Doc. 137, 72d Cong., 1st sess. 
Rivers and Harbors Committee Doc. 
44, 74th Cong., 1st sess. 
Rivers and Harbors Committee Doc. 
34, 75th Cong., 1st sess. 
None. 
H. Doc. 103, 76th Cong., 1st sess. 
H. Doc. 137, 76th Cong., 1st sess. 
None. 
H. Doc. 547, 76th Cong., 3d sess. 
S. Doc. 54, 77th Cong., 1st sess. 
H. Doc. 263, 77th Cong., 1st sess. 
H. Doc. 432, 77th Cong., 1st sess. 
H. Doc. 449, 78th Cong., 2d sess. 
H. Doc. 511, 79th Cong., 2d sess. 
H. Doc. 514, 79th Cong., 2d sess. 
H. Doc. 515, 79th Cong., 2d sess. 
H. Doc. 559, 79th Cong., 2d sess. 
S. Doc. 192, 79th Cong., 2d sess. 
H. Doc. 661, 80th Cong., 2d sess. 
S. Doc. 197, 80th Cong., 2d sess. 
H. Doc. 642, 80th Cong., 2d sess. 
H. Doc. 733, 80th Cong., 2d sess. 
H. Doc. 66, 81st Cong., 1st sess. 
H. Doc. 67, 81st Cong., 1st sess. 
H. Doc. 71, 81st Cong., 1st sess. 
H. Doc. 254, 81st Cong., 1st sess. 
H. Doc. 258, 81st Cong., 1st sess. 
None. 
851 
TABLE 28-G

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 28-G (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Sept. 3, 1954 Construction of Crooked Slough Harbor at Winona, H. Doc. 347, 83d Cong., 2d sess. 
Minn., in lieu of previously authorized commercial 
harbor. 
Sept. 3, 1954 Payment of damages caused by pool No. 24 at H. Doc. 251, 82d Cong., 1st sess. 
Louisiana, Mo. 
July 3, 1958 Permits modification of vertical bridge clearances H. Doc. 33, 85th Cong., 1st sess. 
and authorizes completion of St. Anthony Falls 
project. 
July 3, 1958 Small boat and commercial harbors at Alton, Ill.2 H. Doc. 136, 84th Cong., 1st sess. 
July 3, 1958 Payment of lump sum amounts for damages to H. Doc. 135, 84th Cong., 1st sess. 
drainage and levee districts caused by operation of 
navigation pools. 
July 3, 1958 Improvement and maintenance of Beaver Slough at H. Doc. 345, 84th Cong., 2d sess. 
Clinton, Iowa. 
Mar. 3, 1909 Reconstruction of structures as may be necessary to None. 
provide adequate facilities for existing navigation. 
July 14, 1960 Construction of Industrial Harbor at Red Wing, Minn. H. Doc. 32, 86th Cong., 1st sess. 
Oct. 23, 1962 Construction of small-boat harbors at Savanna, Moline, H. Doc. 513, 87th Cong., 2d sess. 
Andalusia, New Boston, Warsaw, Quincy, and Grafton, 
Ill.; Bellevue, Clinton, Davenport, and Keokuk, Iowa; 
St. Paul (Harriet Island), Minn.; and Bay City, Pepin, 
and Cassville, Wis. 
Oct. 23, 1962 Payment of damages caused by pool 24 at Clarksville, Mo. H. Doc. 552, 87th Cong., 2d sess. 
Oct. 23, 1962 Remedial works at Sandy Slough, Mo. H. Doc. 419, 87th Cong., 2d sess. 
Nov. 7, 1966 Repair of Stone Arch bridge at Minneapolis, Minn. None. 
Nov. 7, 1966 Commercial harbor facilities at Fort Madison, Iowa. H. Doc. 507, 89th Cong., 2d sess. 
1. Deferred. 
2. Inactive. 
852

CHICAGO, ILL., DISTRICT* 
This district comprises eastern Wisconsin, south property at New La Grange lock and dam, exclusive of 
central portion of Upper Peninsula of Michigan, basin of Bureau Creek, Ill. It also includes western 
northeastern and central Illinois, and portions of shore and southern end of Lake Michigan and its 
northwestern Indiana and southwestern Michigan. tributary drainage basins from Peninsula Point, Mich., 
Area in Illinois, southeastern Wisconsin and north- to drainage basin of St. Joseph River, Mich., and 
western Indiana is included in drainage basin of waterways connecting Illinois River with Chicago and 
Illinois River above south boundary of Federal Calumet Rivers. 
IMPROVEMENTS 
Navigation Page 
1. Burns Waterway Harbor, Ind. ............... 853 
2. Calumet Harbor and River, Ill. and 
Ind. ........................................ 854 
3. Cedar River Harbor, Mich. ................... 855 
4. Chicago Harbor, Ill. ............................. 856 
5. Chicago River, Ill. .................................... 856 
6. Fox River, Wis. ........................................ 857 
7. Green Bay Harbor, Wis. ...................... 857 
8. Illinois Waterway, Ill. and Ind............. 858 
9. Indiana Harbor, Ind. ............................ 860 
10. Kenosha Harbor, Wis. .......................... 861 
11. Kewaunee Harbor, Wis. ....................... 862 
12. Manitowoc Harbor, Wis. ...................... 862 
13. Menominee Harbor and River, Mich, 
and Wis. ........................................ 863 
14. Michigan City Harbor, Ind. ............ 863 
15. Milwaukee Harbor, Wis. ...................... 864 
16. New Buffalo Harbor, Mich. ................ 865 
17. Oconto Harbor, Wis. ............................ 865 
18. Port Washington Harbor, Wis. ............ 866 
19. Racine Harbor, Wis. ................................ 866 
20. Sheboygan Harbor, Wis. ...................... 867 
21. Sturgeon Bay and Lake Michigan Ship 
Canal, Wis. ........................................ 867 
22. Two Rivers Harbor, Wis. ....................... 868 
23. 
24. 
25. 
26. 
27. 
28. 
29. 
30. 
31. 
32. 
33. 
34. 
35. 
36. 
37. 
38. 
Navigation (cont.) Page 
Waukegan Harbor, Ill. ............................ 868 
Reconnaissance and condition surveys .. 869 
Other authorized navigation projects .... 869 
Navigation work under special 
authorization ........................................ 869 
Beach Erosion Control 
Evanston, Ill ......................................... 
Authorized beach erosion control 
projects ............................................. 
869 
869 
Flood Control 
Farm Creek, Ill. ..................................... 870 
Mouth of Sangamon River, Ill .............. 870 
Oakley Lake and channel 
improvements, Ill. .............................. 870 
Peoria, Ill. ........................................ 871 
Inspection of completed flood control 
projects ........................................ 872 
Other authorized flood control projects 872 
Flood control work under special 
authorization ..................................... 872 
Surveys ................................................. 
Collection and study of basic data ....... 
Research and development ................... 
872 
872 
872 
NAVIGATION 
1. BURNS WATERWAY HARBOR, IND. 
Location. On Indiana shore of Lake Michigan in 
Porter County, 18 miles east of Illinois-Indiana State 
line, 14 miles east of Indiana Harbor, 9 miles east of 
Gary Harbor 14 miles west of Michigan City Harbor, 
Ind., and 19 miles southeast of Calumet Harbor, Ill. 
(See Lake Survey Chart 75.) 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
853

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Existing project. Provides for (a) a north breakwater 4, 
050 foot long; (b) a west breakwater 1,330 feet long; (c) 
an east breakwater 1,340 feet long; (d) an approach 
channel 30 feet deep and 400 feet wide, extending from 
deep water in Lake Michigan to north end of east 
breakwater; (e) an entrance channel 28 feet deep and 
800 feet wide, from end of approach channel to west 
breakwater; and (f) a 225 acre outer harbor 27 feet 
deep. Project was authorized by 1965 River and 
Harbor Act (H. Doc. 160, 88th Cong., 1st sess.) 
Authorizing act also provides the Secretary of the 
Army may reimburse State of Indiana for expenditure 
of funds used to construct such portions of project as 
approved by Chief of Engineers and constructed under 
supervision of the Chief of Engineers. Unless construction 
of project begins within 3 years from 
enactment of this act, the authority to reimburse State 
of Indiana shall expire. State of Indiana shall furnish 
assurance satisfactory to Secretary of the Army that 
water and air pollution sources will be controlled to 
maximum extent feasible in order to minimize any 
adverse effects on public recreational areas in the 
general vicinity of the harbor. No appropriation is 
authorized to be made for construction of this project 
until Indiana Dunes National Lakeshore has been 
voted upon by both Houses of Congress during the 
same Congress. (The Indiana Dunes National Lakeshore 
Park was authorized by P.L. 89-761, dated 5 
November 1966). 
Project depths are referred to low-water datum for 
Lake Michigan, which is 576.8 feet above mean water 
level at Father Point, Quebec (International Great 
Lakes Datum-1955). Surface fluctuations of Lake 
Michigan in the locality have ranged from a high 
monthly mean of 5.18 feet above to 1.15 feet below lowwater 
datum. Monthly means within any year have 
varied from 0.36 to 2.23 feet. Temporary changes in 
water level may range from a few inches to several feet 
for periods varying from a few minutes to several hours. 
Estimated costs (1970) are $13,600,000 Federal (Corps 
of Engineers) and $76,400,000 non-Federal, a total cost 
of $90,000,000. 
Local cooperation. Fully complied with.. 
Terminal facilities. Under construction by the Port 
Commission of the State of Indiana. There are two steel 
company docks handling iron ore and limestone. 
Operations and results during fiscal year. By Government 
Forces -Review of plans and specifications prepared by 
Indiana Port Commission and inspection of construction 
performed by the Commission for compliance 
with provisions of authorizing document. By Indiana 
Port Commission - Continued harbor dredging by 
contract. 
Condition at end of fiscal year. Construction of North 
Breakwater and Outer West Bulkhead was completed 
in September 1968. Dredging is about 99% complete. 
2. CALUMET HARBOR AND RIVER, 
ILL., AND IND. 
Location. Northeastern Illinois (Cook County), near 
southern end of Lake Michigan, 12.5 miles south of 
Chicago Harbor, and known on Great Lakes as South 
Chicago Harbor, is in southerly part of and within 
corporate limits of city of Chicago, except for a part of 
breakwaters and of anchorages behind same, which are 
in Indiana. Calumet River is within Chicago city 
limits. (See Lake Survey Chart 755.) For description, 
see page 1471 of Annual Report for 1932. 
Previous projects. For details see page 1400 of Annual 
Report for 1962. 
Existing project. (See table 29-C.) 
For a more detailed description see page 1246 of 
Annual Report for 1963. 
Project depths are referred to low water datum for 
Lake Michigan, 576.8 feet above mean water level at 
Father Point, Quebec. (International Great Lakes 
Datum-1955.) Fluctuations in stage of river are 
practically those resulting from changes of water level 
in Lake Michigan. On Lake Michigan, seasonal 
fluctuations in mean stage from low water in winter to 
high water in summer average about 1.2 feet. Local 
and temporary fluctuations of 0.1 to 0.5 foot, due to 
wind and difference in barometric pressures, occur 
daily. Seiches of 3 to 4 feet occur at infrequent 
intervals. Estimated cost for new work (1970) is $28, 
725,000 exclusive of amounts expended on previous 
projects. (See table 29-B for authorizing legislation.) 
Local cooperation. Fully complied with for completed 
modifications and acts of 1960 and 1962. For act of 
August 30, 1935, requirements for dredging in front of 
U.S. Steel Corp. remains. 
Terminal facilities. Calumet River and outer harbor: 
33 docks handling foreign oversea, lake vessels, and 
river barge cargoes. Most important cargoes handled 
are iron ore, grain, petroleum products, coal, limestone, 
sand, gravel, iron and steel products, salt, and general 
overseas cargo. There are two boatyards, one for 
repairs to large lake vessels (this yard has two large 
drydocks), and the other boatyard has one floating 
drydock for repairing and building commercial river 
craft. Government owns one dock which is used by the 
Corps only. There are no other publicly owned docks 
on Calumet River, except one owned by the city of 
Chicago. Lake Calumet: Chicago Regional Port 
District owns and leases to others three transit sheds 
and two grain elevators. There are also three private 
docks handling chemicals, iron and steel products, and 
miscellaneous cargo. 
Operations and results during fiscal year. New work: 1962 
modification: Engineering was accomplished at a cost 
of $3,594. 
Maintenance: Condition surveys and illegal deposit 
studies were made by hired labor at a cost of $76,201. 
Dredging by the U.S. Hopper Dredge. Hoffman was 
854

CHICAGO, ILL., DISTRICT 
completed in November 1969 with a total of 182,359 
cubic yards of material being re moved at a cost of 
$324,348 plus $122,961 contributed by Republic Steel 
Corps., International Harvester Co., and Interlake 
Steel Corp. for removal of flue dust deposits. Dredging 
by U.S. Dipper Dredge. Kewaunee was performed in 
April 1970 with a total of 22,625 cubic yards of 
material being removed at a cost of $47,948. Repairs 
were made to the steel cell breakwater in September 
and October 1969 at a cost of $77,525. A study to 
develop techniques for measurement of suspended 
solids discharged from industrial plants into navigable 
waters was continued by contract at a cost of $20,047. 
Total maintenance costs were $546,069. 
For a resume of litigation to fix the responsibility for 
illegal deposition in navigable waters of a portion of 
Calumet River (United States of America, Plaintiff v. 
Republic Steel Corporation, International Harvester 
Company and Interlake Iron Corporation, defendants) 
and settlement agreement see Annual Report for 1962 
and 1964. Each defendant was issued a permit setting 
forth conditions pertaining to future discharges and 
deposits. Pursuant thereto the three companies paid 
$25,000 for each of the calendar years 1964 through 
1970. 
Condition at end of fiscal year. Existing project is about 
77 percent complete. Work remaining to complete 
project consists of removing hard materials in outer 
harbor; completing the widening, straightening and 
deepening of isolated remaining sections of Calumet 
River; and closing the gap between breakwaters. 
Timber crib breakwater (6,712 feet, completed in 
1904; concrete superstructure completed in 1924) is in 
fair condition. Cellular type steel-sheet pile breakwater 
(5,007 feet, completed in 1935) is in fair condition. 
Under permit from the Secretary of War, the Youngstown 
Sheet & Tube Co. and its predecessors removed 
all of south pier (completed in 1897) and replaced it 
with a concrete dock wall 2,961 feet long and 50 feet 
southerly of pier's original location. Under permits 
from the department, the Defense Plant Corp. built 
two sections of bulkheads on east side of river between a 
point opposite the Semet-Solvay slip and south side of 
former turning basin 3 at about 117th Street. United 
States widened and deepened the channel adjoining 
the new bulkhead except through the rock section, 
where widening was done by the corporation. Depths 
at low water datum in outer harbor varied from 26 to 
29 feet. Controlling depth in entrance channel is 27 
feet. Controlling depth in river is about 27 feet to and 
including turning basin 5 and in Lake Calumet 
channel. Head of navigation for deep-draft vessels in 
the river is at turning basin 5 on north side of 130th 
Street. Total costs of existing project to end of fiscal 
year were $30,489,317, of which $21,219,634 was for 
new work ($18,183,031 regular funds and $3,036,603 
public works funds), $8,580,682 regular funds for 
maintenance, and $689,001 regular funds for rehabilitation. 
3. CEDAR RIVER HARBOR, MICH. 
Location. At mouth of Cedar River on west shore of 
Green Bay, an arm of Northern Lake Michigan about 
68 miles north of city of Green Bay. Nearest harbors are 
Menominee, Mich., 27 miles southwest and at Escanaba, 
Mich., 20 miles northeast. (See Lake Survey 
Chart 70 and 702). 
Existing project. Two parallel entrance piers, a west 
pier 301 feet long and a rubblemound east pier 2,100 
feet long with a cellular sheet pile pierhead and sport 
fishing walkway; an entrance channel 100 feet wide 
and 10 feet deep from that depth in Green Bay to 
mouth of Cedar River about 2,100 feet long; an inner 
channel in Cedar River 1,400 feet long, 80 feet wide, 
and 8 feet deep upstream to about 150 feet below State 
Route 35 bridge; and a turning basin 150 feet wide 
near upstream end of inner bridge channel. Project 
depths are referred to low-water datum for Lake 
Michigan, which is 576.8 feet above mean water level 
at Father Point, Quebec (International Great Lakes 
Datum 1955). Fluctuations of water level are seasonal 
changes of about one-half foot above or below annual 
mean stage and extreme fluctuations of a temporary 
nature, due to wind and barometric pressures, of 
several feet above or below mean lake level prevailing 
at the time. 
Estimated costs (1970) of new work are $745,000 
Federal (Corps of Engineers) and $166,000 non-Federal, 
which includes a cash contribution of $128,000. 
Total project cost is $911,000. (See table 29-B for 
authorizing legislation.) 
Local cooperation. The 1965 modification provides that 
local interests will contribute in cash 15 percent of the 
first cost of the new navigation facilities and 50 percent 
of the first cost of structural modifications necessary to 
provide for sport fishing walkway on top of the new east 
pier, the total of such contributions being $138,000 
(July 1970 estimate) to be paid in a lump sum prior to 
initiation of construction and to be subject to final 
adjustment after actual costs have been determined; 
provide without cost to the United States all lands, 
easements, and rights-of-way required for the construction 
and subsequent maintenance of the project 
and for aids to navigation upon the request of the Chief 
of Engineers, including suitable areas determined by 
the Chief of Engineers to be required in the general 
public interest for initial and subsequent disposal of 
spoil; and necessary retaining dikes, bulkheads, and 
embankments therefor or the cost of such retaining 
works; hold and save the United States free from 
damages due to the construction works and maintenance 
of the project; provide and maintain without 
cost to the United States necessary mooring facilities 
and utilities, including an adequate public landing 
with provision for the sale of motor fuel, lubricants and 
potable water and a parking lot with adequate sanitary 
facilities available to all on equal terms and including 
dredging of berthing areas to depths commensurate 
855

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
with the related project depths; and reserve anchorage 
spaces and mooring facilities adequate for the accommodation 
of transient craft. Formal assurances 
have not been requested. 
Terminal facilities. There are no permanent docking, 
mooring or handling facilities. 
Operations and results during fiscal year. Planning was 
continued at a cost of $222. 
Condition at end of fiscal year. Planning is underway. 
4. CHICAGO HARBOR, ILL. 
Location. Northeastern Illinois, near southern end of 
Lake Michigan; 85 miles southerly from Milwaukee, 
Wis. (See Lake Survey Chart 752.) 
Previous projects. See page 1396 of Annual Report for 
1962. 
Existing project. (See table 29-C.) 
For more detailed description see page 1242 of 
Annual Report for 1963. Depths in north part of inner 
basin and entrance channel to Chicago River west of 
lock and controlling works of Metropolitan Sanitary 
District of Greater Chicago are referred to normal pool 
elevation 576.2 feet above mean water level at Father 
Point, Quebec (International Great Lakes Datum- 
1965) east or lakeward of lock, depth in entrance 
channel is referred to low-water datum for Lake 
Michigan elevation 576.8 feet above International 
Great Lakes Datum. Seasonal fluctuations are mean 
stage from low water in winter to high water in summer 
average about 1.2 feet. Local and temporary fluctuations 
of 0.1 to 0.5 foot, due to wind and difference in 
barometric pressure, occur daily. Seiches of 3 to 4 feet 
occur at infrequent intervals. Completed Federal cost 
(1970) is $4,342,822, exclusive of amounts expended on 
previous projects. (See table 29-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are seven docks for handling 
various types of cargo, including overseas general 
cargo, salt and newsprint. Passenger excursion boats 
use three docks. There is one marine service dock for 
pleasure craft and two yacht club docks. City of 
Chicago owns five docks, four of which are used for 
commercial purposes. 
Operations and results during fiscal year. Maintenance: 
Condition surveys were conducted at a cost of $277. 
Condition at end of fiscal year. Existing project is 
complete. Northerly arm of inner breakwater (timber 
4,034 feet, with 304 feet of shore return on north end, 
completed in 1875; concrete superstructure completed 
in 1934) is in good condition. Southerly arm of inner 
breakwater (timber 2,544 feet, completed in 1880; 
concrete superstructure completed in 1930) is in good 
condition after current rehabilitation by conversion to 
rubblemound completed in August 1966. Exterior 
breakwater (timber cribs 5,413 feet, completed in 1889; 
concrete superstructure completed in 1930) is deteriorated 
under water and was rehabilitated in 1966 
by conversion of lake side of structure to rubblemound. 
Southerly extension (rubblemound 2,213 feet, completed 
in 1917), and south arm (rubblemound 1,526 
feet, completed in 1920; and concrete caisson 1,185 feet 
completed in 1922) are in good condition. Shore-arm 
extension (timber cribs 2,250 feet, completed in 1917; 
inner 1,050 feet capped with concrete superstructure 
1951; next adjoining 1,000 feet capped with stone 
blocks 1956; outer 200 feet capped with concrete 
superstructure 1952) is in good condition. Channel side 
of north pier (concrete superstructure, 960 feet, 
completed in 1908, repaired in 1949, and rebuilt with 
steel sheet piling in 1965) is in good condition. 
Controlling depth is 21 feet below normal pool from 
Rush Street to Chicago Controlling Works Lock, 21 
feet below low water datum from lock to west end of 
Navy Pier, 28 feet in channel and maneuver area and 
29 feet in approach channel. Water level landward of 
lock is controlled and maintained at an elevation lower 
than that of Lake Michigan except during excessive 
storm runoff. Total costs of existing project were $9, 
437,699, of which $4,342,822 was for new work, $3,678, 
277 for maintenance, and $1,326,600 for rehabilitation. 
5. CHICAGO RIVER, ILL. 
Location. Cook and Lake Counties, Ill., navigable 
portions being wholly in Cook County and city of 
Chicago. (See Lake Survey Chart 752). For description, 
see page 1467 of Annual Report for 1932. 
Previous projects. See page 1394 of Annual Report for 
1962. 
Existing project. Provides for a channel 21 feet deep in 
the main river from its mouth at Rush Street to the 
junction of North and South Branches (0.7 miles), in 
the North Branch from the junction to North Avenue 
(2.22 miles), in the North Branch Canal (1.04 miles), 
and in the North Branch Turning Basin just south of 
North Avenue; and for a channel 9 feet deep in the 
North Branch from North Avenue to Addison Street. 
All depths are referred to normal pool, elevation 576.2 
feet above mean water level at Father Point, Quebec 
(International Great Lakes Datum-1955). Portion of 
project authorized by River and Harbor Act of 1946, is 
in deferred-for-restudy category. Estimate (1960) for 
this portion is $65,000. (See table 29-B for authorizing 
legislation.) 
Local cooperation. Fully complied with for completed 
modifications. Act of July 24, 1946, provided improvement 
of channel is subject to condition that local 
interests furnish assurances they will hold the United 
States free from damages which may result from 
construction and maintenance of improvement. Requirement 
has not been complied with. 
Terminal facilities. There are 23 docks handling lake 
vessel and river barge cargoes. Most important cargoes 
handled are sand, gravel, coal, salt, cement, and 
856

CHICAGO, ILL., DISTRICT 
petroleum products. There are three boatyards, two of 
which are used for servicing recreational craft and one 
engaged in constructing and servicing small craft as 
well as small Navy vessels. U.S. Government has two 
docks used by the Corps exclusively. 
Operations and results during fiscal year. Maintenance: 
Condition surveys and illegal deposit studies were 
made by hired labor at a cost of $9,031. Engineering 
and design was performed by hired labor at a cost of $6, 
860. Total government maintenance costs were $15, 
891. 
Condition at end offiscalyear. Project is complete except 
for dredging the channel between Belmont Avenue and 
Addison Street as authorized by 1946 River and 
Harbor Act. Controlling depths below normal pool for 
practicable widths: In main river, 21 feet; in North 
Branch to turning basin, 19 feet; in North Avenue 
turning basin 18 feet;'North Avenue to Addison Street, 
10 feet; and in North Branch Canal, 16 feet, Water 
level in Chicago River is controlled and maintained at 
an elevation lower than that of Lake Michigan, except 
during excessive storm runoff into the river. Heads of 
navigation for deep-draft vessels are North Avenue on 
North Branch, and Archer Avenue on west fork of 
South Branch, 5.97 and 5.52 miles, respectively, from 
Michigan Avenue Bridge. Head of navigation for 
barge traffic is near Touhy Avenue on North Shore 
Channel, about 11 miles from Michigan Avenue 
Bridge. 
Total costs of existing project to June 30, 1970 were 
$3,588,919, of which $544,679 was for new work and 
$3,044,240 for maintenance. 
6. FOX RIVER, WIS. 
Location. Rises in Columbia County, Wis., and flows 
about 176 miles northerly into Green Bay. Wolf River, 
physically main river but by designation a tributary of 
Fox River, rises in central part of Forest County, Wis., 
and flows southerly. (See Lake Survey Chart 720 for 
Lake Winnebago and lower Fox River.) 
Previous projects. See page 1368 of Annual Report for 
1962. 
Existing project. Deepening and widening channel of 
Fox River from DePere 7 miles above mouth to 
confluence of Wolf River, a total length of 59 miles, to 
be 6 feet, with 9.6 feet in rock cut below DePere lock 
and 7 feet in other rock cuts on lower river below 
Menasha lock; construction and reconstruction of 19 
locks and 9 dams; a concrete retaining wall at 
Kaukauna; construction and maintenance of harbors 
having depths of 6 feet on Lake Winnebago; widening 
Neenah Channel to 100 feet, with a 6-foot depth for 
about 1 mile; and dredging, snagging, and otherwise 
improving Wolf River 47 miles from its mouth to New 
London, depth to be 4 feet. All depths are referred to 
standard low water. Ordinary and extreme fluctuations 
of water level above and below mean stages on 
various parts of improvement, due to floods and other 
causes, are set forth in table 29-E on water fluctuations. 
Cost of completed portion of project is $513,424 for 
the lower river exclusive of previous projects. River and 
Harbor Act of 1925 portion of project is considered 
inactive and excluded from cost estimate. Estimated 
cost (1954) of this portion is $2,886,000. (See table 29-B 
for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. Wharf and landing facilities are in 
general, adequate for accommodation of existing 
commerce. (See table 29-D on locks and dams, Fox 
River, Wisc.) 
Operations and results during fiscal year. Maintenance: 
Condition surveys, discharge observations, and inspections 
and reports were conducted by hired labor at 
a cost of $46,428. Locks and dams were operated as 
required and necessary repairs made to structures at a 
cost of $383,888. Dredging in Boom Cut on the Wolf 
River and Fond du Lac Harbor on Lake Winnebago 
was accomplished at a cost of $95,882. Total maintenance 
costs were $526,198. 
Condition at end of fiscal year. Existing project is 
complete except for inactive portion. Nineteen original 
locks and nine original dams have been rebuilt. (See 
existing project for year of completion of each.) 
Structures and dredging in pools have increased 
original depths generally about 2 feet. 
Practicable drafts of vessels are about one-half foot 
less than controlling depths which prevail all year 
except when rivers are frozen, usually from December 
1 to April 1. Work remaining to complete project 
consists of dredging in upper portion of Wolf River, 
and rock removal and deepening Neenah Channel on 
lower Fox River, which are no longer considered 
necessary. Except for Menasha lock, which should be 
rebuilt, existing locks and dams are in generally fair to 
good condition. 
Co st for existing project to June 30, 1970 were $513, 
424 for new work and $11,438,365 for operation and 
maintenance, a total of $11,951,789. Funds in the 
amount of $3,706,187 were expended between July 5, 
1884, and June 30, 1935, on operating and care of 
works of improvement under provisions of permanent 
indefinite appropriation for such purposes. 
7. GREEN BAY HARBOR, WIS., 
Location. At mouth of Fox River, at head of Green 
Bay, about 180 miles from Milwaukee, Wis., via 
Sturgeon Bay Canal, and about 49 miles southwest of 
Menominee Harbor, Mich., and Wis. (See Lake 
Survey Chart 725.) 
Previous projects. See page 1366 of Annual Report for 
1962. 
Existing project. (See table 29-C.) (The 1962 modification 
is set forth in table at end of chapter.) 
857

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
For a more detailed description of project see page 
1216 of Annual Report for 1963. Project depths are 
referred to low-water datum for Lake Michigan, 576.8 
feet above mean water level at Father Point, Quebec 
(International Great Lakes Datum-1955). Fluctuations 
of water level are seasonal changes of about one-half 
foot above or below annual mean stage and extreme 
fluctuations of a temporary nature, due to wind and 
barometric pressure of about 2.5 feet above or below 
mean lake level prevailing at the time. 
Federal estimate is $7,884,000 (July 1970). Non- 
Federal estimate is $490,000 (July 1970) including 
$100,000 contributed funds. Does not include inactive 
portion of 1962 River and Harbor Act estimated, in 
June 1965, at $63,000 (Federal) and $90,000 (Non- 
Federal). (Dredging reach from 150 feet downstream of 
C.&N.W. Railway Bridge through and to 1,700 feet 
upstream of said bridge.) (See table 29-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 16 wharves for handling 
coal, petroleum products, cement, limestone, general 
overseas cargo and miscellaneous commodities. Facilities 
are considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 1962 
modification: Dredging phase I by contract was 
completed in September 1967. Payments to contractor 
were made during fiscal year in amount of $35,016. 
Planning for Phase II was continued at a cost of $31, 
554. Dredging Phase II with the U.S. Hopper Dredge 
Markham was started in September 1969. A total of 
540,000 cubic yards of material were removed. Total Phase 
II costs were $884,588. 
Maintenance: Condition surveys were made by 
hired labor at a cost of $12,130. Miscellaneous 
maintenance was accomplished at a cost of $56,823. 
Total maintenance costs were $68,953. 
Condition at end of fiscal year. Existing project is about 
65 percent complete. The 1962 modification was 
started in November 1966 and is 55 percent complete. 
Dredging turning basin above Chicago & North 
Western Railway Bridge was commenced in August 
and completed in September 1938. East revetment at 
Grassy Island was entirely removed in June 1967. West 
revetment was entirely removed in July 1935. Controlling 
depths at low-water datum are 22 feet in outer 
channel to Tail Point Light, 26 feet to Grassy Island, 24 
feet in channel through city of Green Bay, 20 feet in 
turning basin above the C.&N.W. railway bridge, and 
14 feet in the remainder of the Fox River channel to 
DePere. (See table 29-F for total costs of existing 
project toJune 30, 1969.) 
8. ILLINOIS WATERWAY, ILL. AND IND. 
Location. Illinois River (entirely within State of 
Illinois), formed by confluence of Kankakee and Des 
Plaines Rivers, flows southwesterly and enters Mississippi 
at Grafton, Ill., about 38 miles above St. Louis. 
Illinois Waterway comprises Illinois River from its 
mouth to confluence of Kankakee and Des Plaines 
Rivers (273 miles); Des Plaines River to Lockport (18.1 
miles) and Chicago Sanitary and Ship Canal and 
South Branch of Chicago River to Lake Street, 
Chicago (34.5 miles). Also from a point 12.4 miles 
above Lockport, Ill., waterway comprises Calumet-Sag 
Channel and Little Calumet and Calumet Rivers to 
turning basin 5, near entrance to Lake Calumet (23.8 
miles); and Grand Calumet River from junction to 
141st Street, deep (lake) draft navigation (9 miles) and 
to Clark Street, Gary, Ind. (4.2 miles). 
Previous Projects. For details, see page 1945 of Annual 
Report for 1915 and page 1172 of Annual Report for 
1932. 
Existing project. See table 29-C and page 1255 of 
Annual Report for 1963. Estimated cost of new work 
(1970) is $489,447,000. 
(See also tables 29-B, 29-G, 29-H and 29-I on 
authorizing legislation; existing and proposed locks 
and dams; lock and dam construction, foundations, 
cost; and additional features entering into cost of 
project.) 
Local cooperation. Complied with for completed 
modifications and Part I of Calumet-Sag Modification, 
except for widening below Starved Rock under August 
30, 1935 Act. Required cooperation for Calumet-Sag 
Modification, Part II, is that local interests furnish free 
of cost to the United States all lands, easements, and 
rights-of-way and spoil-disposal areas necessary for the 
new work and for subsequent maintenance when and 
as required, including the alteration of utilities, as 
necessary, with the exception of such land needed for 
the waterway as is now occupied by abutments or 
railroad tracks at the approaches to railroad bridges; 
agree to remove at their own expense all obstructive 
highway, street and foot bridges across the channels 
included in the project which will not be replaced. 
Required cooperation under October 23, 1926 Act 
(Duplicate Locks) is that prior to construction local 
interests agree to assume title to and maintain and 
operate new bridge across lower approach to Brandon 
Road lock when bridge is placed in service. Formal 
assurances for the October 23, 1962 Act and Part II of 
Calumet-Sag Modification have not been requested. 
For details see Pages 1412 to 1414, Annual Report of 
1962. 
Terminal facilities. Of the 13 principal cities and towns 
along Illinois River, about five own dock frontage, 
more or less improved for boat landings; four own dock 
frontage with no improvements; and four own no 
frontage except at street ends. At Peoria, there is a 
$400,000 modern river-rail municipal public terminal 
with available frontage of 1,100 feet; 205 feet occupied 
by a dockhouse and 190 feet by an open dock. 
Dockhouse is served by a wharf boat 45 by 230 feet, and 
an escalator capable of handling 1,000 tons a day. This 
terminal is served by equivalent of a beltline railroad. 
858

CHICAGO, ILL., DISTRICT 
Grain barge loading facilities are available at 26 docks 
between Grafton and Joliet, 21 of which have grain 
elevators. Private coal-loading terminals are at Frederick, 
Havana, Liverpool, Copperas Creek, Kingston 
Lake, and Peoria. Coal-unloading terminals are at 
Havana and Hennepin powerplants; at mouth of 
Vermillion River near La Salle and at Joliet. Bulkpetroleum 
terminals are in Havana, Kingston Mines, 
Peoria, Peru, Seneca, and Joliet. Sand and gravel 
plants are at Kingston Lake, Chillicothe, Ottawa, 
Morris, Joliet, and Lockport. From Chicago Sanitary 
and Ship Canal, sand, gravel, oil, grain, and gasoline 
are shipped from Lockport, and petroleum products, 
steel and stone from Lemont. Two grain elevators are 
at Lockport. Bulk-petroleum terminals are at Argo and 
Forest View, Ill., and at California Avenue, Cicero 
Avenue, Justice and Kedzie Avenue, Chicago; one 
liquid industrial-chemicals terminal is at Marseilles, 
one at Seneca, two at Morris, two at Channahan, three 
at Joliet, one at Willow Springs and one at Cicero 
Avenue in Stickney, Ill. Private coal-unloading terminals 
are at Ridgeland Avenue, Crawford Avenue, 
Loomis Street, Fisk Street, and Addison Street, 
Chicago. At Western Avenue, Chicago, bulk and 
package sugar are handled through American Sugar 
Refining Co. Bulk fertilizer terminals are at Marseilles 
(two), and Joliet. A liquid asphalt terminal is at 
Summit. Cement terminals are at Lemont, Summit, 
Forest View, and at Cicero Avenue in Chicago. A scrap 
iron bulk terminal is at California Avenue, Chicago. 
State of Illinois barge terminal, including a 1,500,000- 
bushel grain elevator, is at Damen Avenue, Chicago, 
on South Branch of Chicago River. One sand-andgravel 
distribution yard is on the Calumet-Sag Channel. 
A petroleum-unloading terminal is on Little 
Calumet River at Riverdale, just upstream from 
junction with Sag Channel; and two petroleum 
terminals are at Homan Avenue in Blue Island. Plans 
for further terminals and docks between Grafton and 
Chicago are underway. 
Operations and results during fiscal year. New work: 
Duplicate Locks-Planning was continued by government 
forces with costs of $251,159. 
Calumet-Sag Modification, Part I--Channel widening: 
Widening at 127th Street was completed; 164, 
458 cubic yards were removed at a cost of $116,001. 
Fiscal adjustment in contract widening at 96th Avenue 
Highway bridge was -$15,000; widening and deepening 
Mile 317.0 to 319.7 (Sec. 5) was continued by 
contract; 385,591 cubic yards of excavation were 
removed at a cost of $997,900; dredging is 96 percent 
complete. 
Railroad Bridge relocations: Fiscal adjustments in 
completed bridge relocations are as follows: Gulf 
Mobile and Ohio Railroad Bridge, -$41,315, Chicago 
Rock Island and Pacific Railroad Bridge, -$15,249; 
and Kensington and Eastern Railroad bridge and 
trackwork, $457. Construction of Illinois Central 
Railroad bridge was continued with fiscal costs of $1, 
676,516; work is 24 percent complete. Acquisition of 
rights-of-way continued for Blue Island bridges; 
Michigan Central; Gulf, Mobile and Ohio; Wabash; 
Pennsylvania; Illinois Central; Chicago and Western 
Indiana; and Kensington and Eastern with fiscal year 
costs of $35,230. 
Highway bridge relocations and modifications: 
Construction of 127th Street bridge was completed in 
September 1969 with fiscal year costs of $69,936. 
Construction of Francisco Avenue Highway Bridge 
was started by contract on 7 July 1969 with fiscal year 
costs of $445,176; work is 74 percent complete. Fiscal 
adjustments in completed bridges are as follows: 96th 
Avenue, $28; and Chatham Street, $8,012. Acquisition 
of rights-of-way for 96th Street, 104th Street, Harlem 
Avenue, Ridgeland Avenue, 127th Street, Cicero 
Avenue, Kedzie Avenue, Francisco Avenue, Western 
Avenue, Division Street, Chatham Street and Indiana 
Avenue cost $99,877. 
Miscellaneous hired labor, including supervision 
and administration by the project office, cost $294,862. 
Calumet-Sag Modification, Part II-Planning by 
government forces was started with costs of $34,840. 
Maintenance: Alton Pool costs by hired labor for 
condition and operation studies were $41,493; inspection 
and reports, $847; dredging, $148,252; gages, 
$8,768; and, supervision and administration, $21,743. 
Total maintenance costs for Alton Pool were $221,103. 
All pools above Alton Pool. Condition and operation 
studies were conducted by hired labor at a cost of $490, 
580. U. S. Derrick Barge No. 3 and a crane barge 
performed remedial bank protection work, removed 
silt, obstructions and snags from the channel and 
removed other debris from forebays of locks and sluice 
gates at dams to maintain operation of navigable 
structures as well as assisted in the rehabilitation of 
locks and dams at a cost of $221,654. Dredging by 
contract was performed in the Little Calumet River 
with a total of about 70,000 cubic yards of material 
being removed at a cost of $266,114. A study to develop 
techniques for measurement of suspended solids discharged 
from industrial plants into navigable waters 
was performed by contract at a cost of $17,321. 
Operation and care of lock and dams: The locks and 
dams were operated as required and the necessary 
minor repairs made thereto and to appurtenant 
structures at a cost of $2,151,716. 
Total operation and maintenance costs were $3,147, 
385 for all pools above Alton Pool. 
Condition at end of fiscal year. The existing project, 
exclusive of the Calumet-Sag and Duplicate Locks 
modifications was 93 percent complete. The Calumet- 
Sag modification, Part I, was 85 percent complete. 
Preconstruction planning on the Duplicate Locks and 
Calumet-Sag Modification, Part II, was in progress. 
Eight locks and 6 dams are complete, and there is a 
channel 300 feet wide and 9 feet deep between Grafton 
and Lockport, Ill., with exception of Marseilles Canal 
859

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
which is 200 feet wide. Controlling depth of river as it 
prevails is 9 feet during extreme low water. Limiting 
horizontal clearance is as follows: 118 feet at a bridge in 
the reach from Grafton to Utica, Ill.; 110 feet at bridges 
between Utica and Lockport, Ill.; 80 feet at the 
emergency (Butterfly) dam, mile 293.1, between 
Lockport and the Sag Junction; 80 feet at a bridge 
between the Sag Junction and Lake Michigan via 
Chicago Sanitary and Ship Canal and Chicago River; 
and 65.0 feet at a bridge between the Sag Junction and 
turning basin 5 in Calumet River, via the Calumet-Sag 
Channel, Little Calumet and the Calumet River. 
Work remaining on 1935 modification is dredging 
section 2 above Starved Rock and widening Pekin 
Bend. Remaining uncompleted items for Calumet-Sag 
modification Part I are: relocation of 3 highway 
bridges; provision for lift on one highway bridge; one 
railroad bridge; widening and deepening section 5; 
dredging part 2 of Acme Bend; and channel widening 
at 4 bridge sites. Remaining works in parts II and III of 
Calumet-Sag modification is replacement of emergency 
(Butterfly) dam in Chicago Sanitary and 
Ship Canal, construction along general route of Grand 
Calumet River of a channel with usable depth of 9 feet, 
225 feet wide between Little Calumet River and the 
junction with Indiana Harbor Canal and 160 feet wide 
easterly from said junction to Clark Street, Gary, 
Indiana with a turning basin at Clark Street; enlargement 
of the Calumet River Branch of the Indiana 
Harbor Canal to 225 feet wide and usable depth of 9 
feet between Grand Calumet River and vicinity of 
141st Street, inclusive; construction of a lock and 
control works in Calumet River near its head and of 
similar structures in proposed Grand Calumet Channel 
west of the Indiana Harbor Canal; alteration or 
elimination of restrictive highway bridges and railroad 
bridges across these channels lakeward of Chicago 
Sanitary and Ship Canal, or construction of new 
bridges to provide suitable clearances, with apportionment 
of the cost between the bridge owners and 
the United States in accordance with the principles set 
forth in agreement February 23, 1945 and Public Law 
647, 76th Congress, as amended. Also, 1962 modification, 
duplicate locks at seven locations, Lockport, 
Brandon Road, Dresden Island, Marseilles, Starved 
Rock, Peoria, and La Grange has not been started. (See 
table 29-J for total cost of existing project to June 30, 
1970.) 
9. INDIANA HARBOR, IND. 
Location. Northwestern Indiana (Lake County), on 
southwest shore of Lake Michigan, 18 miles southeast 
of Chicago Harbor. (See Lake Survey Chart 755.) 
Previous projects. For details see page 1943 of Annual 
Report for 1915, and page 1520 of Annual Report for 
1938. 
Existing project. Provides for a northerly rubblemound 
breakwater, 1,120 feet long, an easterly reinforced 
concrete-caisson breakwater 201 feet long, an extension 
of this latter breakwater about 2,300 feet to north, and 
construction and placing of a light-house crib; an outer 
harbor entrance channel generally 800 feet wide with a 
depth of 29 feet; dredging an outer harbor basin to 28 
feet deep, and a canal entrance channel to 27 feet deep; 
deepening main stem of Indiana Harbor canal for a 
width of 190 feet with a depth of 25 feet from outer 
harbor to 100 feet lakeward of Dickey Place; widening 
canal to a bottom width of 260 feet with a depth of 22 
feet from 100 feet lakeward of Dickey Place to The 
Forks and dredging Calumet River Branch from The 
Forks to 141st Street to same width and depth; a 
channel 22 feet deep and 160 feet wide in Lake George 
Branch from The Forks to White Oak Avenue; 
maintenance of a channel 20 feet deep and 80 feet wide 
in remainder of Calumet River Branch south of north 
line of 141st Street, except removal of sewage deposits 
and other city refuse, after completion and acceptance 
from private parties; and construction of a turning 
basin at The Forks 22 feet deep. That part of Calumet 
River Branch Channel from north line of 141st Street 
to Grand Calumet River has not been completed by 
local interests or accepted for maintenance by the 
United States. Project depths are referred to low water 
datum for Lake Michigan, 576.8 feet above mean 
water level at Father Point, Quebec (International 
Great Lakes Datum-1955). Seasonal fluctuations in 
mean stage from low water in winter to high water in 
summer average about 1.2 feet. Local and temporary 
fluctuations of 0.1 to 0.5 feet, due to wind and 
difference in barometric pressures, occur daily. Seiches 
of 3 to 4 feet occur at infrequent intervals. Estimated 
cost for new work (1970) is $5,004,000 Federal and 
$984,000 non-Federal, exclusive of amounts expended 
on previous project. Uncompleted portion of 1930 
River and Harbor Act is considered inactive, cost of 
$234,000 (1965) Federal is excluded from present cost 
estimate. Uncompleted portion of 1935 River and 
Harbor Act is considered inactive, costs of $1,228,000 
(July 1965) Federal and $595,000 (July 1965) non- 
Federal are excluded from the present cost estimate. 
(See table 29-B for authorizing legislation.) 
Local cooperation. Act of 1937 provides enlargement of 
Indiana Harbor Canal shall not be undertaken until 
local interests furnish a right-of-way 300 feet wide and 
construct substantial bulkheads along channel on 
established lines shown on map accompanying Rivers 
and Harbors Committee Document 13, 75th Congress, 
1st session, provided that improvement on one side may 
proceed in any section on fulfillment of conditions for 
that side of section, and provided further, that south of 
turning basin at The Forks (beginning 450 feet south of 
intersection of present Calumet Branch and mainstem 
bulkhead lines), widening and deepening by the 
United States shall be done only as rights-of-way and 
bulkheads on at least one side of channel are 
continuously provided southward from above limit of 
turning basin at The Forks. To provide for 300-foot 
860

CHICAGO, ILL., DISTRICT 
channel, a parcel of land (of about 4.6 acres), generally 
100 feet wide, lying on east side of Calumet River 
Branch, commencing at north side of 141st Street and 
extending northward toward The Forks for about 2,170 
feet, has been conveyed to and accepted by the United 
States. Local interests constructed about 1,350 feet of 
bulkhead along east side of Calumet River Branch, and 
reconstructed bulkhead on west side from The Forks to 
141st Street. Defense Plant Corp. built a bulkhead 
along east side of canal between Pennsylvania Railroad 
Co.'s bridge and Dickey Place Bridge; the United 
States widened and deepened east side of this portion of 
widening. Youngstown Sheet and Tube Co. constructed 
a bulkhead along west side of canal between 
Indiana Harbor Belt Railroad Co. bridge and the 
Pennsylvania Railroad Co. bridge, and the United 
States widened and deepened west side of this portion 
of widening. All prior requirements fully complied 
with. Act of 1965 provides that local interests agree to 
hold the United States free from damages due to 
construction works and maintenance of improvement; 
provide and maintain depths in berthing areas serving 
terminals commensurate with depth provided in 
related project area; and make required relocations of 
submarine utility crossings. Assurances have not been 
requested for work authorized by the act of 1965. 
Terminal facilities. Four docks for handling iron ore, 
limestone and taconite; two docks for handling steel 
mill products by barge; eight docks for petroleum 
products; three docks for miscellaneous commodities 
and two docks used exclusively for winter mooring of 
vessels in layup. 
Operations and results during fiscal year. Maintenance: 
Condition surveys, illegal deposit investigations and 
engineering and design by hired labor cost $73,363. A 
study to develop techniques for measurement of 
suspended solids discharged from industrial plants into 
navigable waters was continued by contract at a cost of 
$4,280. Total maintenance costs were $77,643. 
Condition at end of fiscal year. Existing project is about 
99 percent complete (excludes inactive portion). Work 
remaining to complete existing project is main stem of 
Indiana Harbor Canal to 25 feet deep and 190 feet 
wide from outer harbor to 100 feet lakeward of Dickey 
Place Bridge. North breakwater (rubblemound, 1,120 
feet, completed in 1922) is in good condition. East 
breakwater (concrete caisson, 201 feet, completed in 
1926) and northerly extension (rubblemound, 2,324 
feet, completed in 1935) are in good condition. 
Controlling depths for practicable widths: 28 to 29 feet 
in entrance channel parallel to rubblemound breakwater; 
28 feet in outer harbor, 27 feet bulkheads of. steel 
companies to the 5 bridges; 22 feet from the 5 bridges to 
the turning basin at The Forks; 18 feet in turning basin 
east of Canal Street; 22 feet in turning basin at The 
Forks; 14 to 18 feet in Calumet River Branch from 
turning basin at The Forks to about 100 feet north of 
141st Street bridge; and 22 feet from turning basin to 1, 
000 feet above Indianapolis Boulevard bridge on Lake 
George Branch. Depths are referred to low-water 
datum. Head of navigation for commercial vessels is at 
the Baltimore & Ohio Terminal Railroad bridge on 
the Lake George Branch about 3 miles from outer 
harbor, and at 141st Street highway bridge about 2,200 
feet south of The Forks on the Calumet River Branch 
about 2.5 miles from outer harbor. 
The total costs of the existing project to June 30, 
1970 were $8,881,481, of which $7,250,940 were 
regular funds, $1,618,041 Public Works funds, and $12, 
500 contributed funds; $4,848,980 being for new work 
and $4,032,501 for maintenance. 
10. KENOSHA HARBOR, WISC. 
Location. On west shore of Lake Michigan about 35 
miles south of Milwaukee and about 54 miles north of 
Chicago. (See Lake Survey Chart 74.) 
Previous projects. See page 1390 of Annual Report for 
1962. 
Existing project. See table 29-C. For detailed description 
see page 1237, Annual Report for 1963. 
Project depths are referred to low-water datum for 
Lake Michigan, 576.8 feet above mean water level at 
Father Point, Quebec (International Great Lakes 
Datum-1955). Fluctuations of water level are seasonal 
changes of about one-half foot above or below annual 
mean stage, and extreme fluctuations of temporary 
nature, due to wind and barometric pressure of several 
feet above or below mean lake level prevailing at the 
time. Estimated (1970) Federal cost is $484,000, 
exclusive of amounts expended on previous projects. 
Non-Federal estimate is $43,000 (July 1970) including 
$3,000 contributed by local interests. (See table 29-B 
for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Three wharves used for miscellaneous 
foreign oversea commodities and autos, and 
also several fishing wharves. While these facilities are 
considered generally adequate for existing commerce, 
more efficient use of existing terminals and utilization 
of available frontage for development of additional 
terminals should be made. 
Operations and results during fiscal year. Maintenance: 
Condition surveys were made by hired labor at a cost of 
$7,583. U. S. Dredge Kewaunee operations in July and 
August 1969 removed 33,450 cubic yards of material at 
a cost of $35,535. Total maintenance costs were $43, 
118. 
Rehabilitation: Rehabilitation of the north pier by 
hired labor was continued with fiscal year costs of $186, 
119. 
Condition at end of fiscal year. The existing project is 
complete except for dredging 25 foot strips adjacent to 
the north and south piers which will be completed after 
rehabilitation of the piers. The north and south piers 
were completed in 1900, and the breakwater in 1909. 
The north pier is in poor condition and is being 
repaired. The south pier and breakwater are in 
generally fair condition. Controlling depths at low 
861 
451-584 0-72-55

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
water datum were 27 feet or more in the lake approach 
channel, 26 feet in approach channel, 25 feet in 
entrance channel and inner basin to 51st Place, and 
depths of 16 feet or more in the channel extending 
northwesterly to 50th Street Bridge. (See table 29-K for 
costs under existing project.) 
11. KEWAUNEE HARBOR, WIS. 
Location. On west shore of Lake Michigan, about 105 
miles north of Milwaukee and about 78 miles from 
Green Bay, via Sturgeon Bay Canal. Harbor is at 
mouth of Kewaunee River. (See Lake Survey Chart 
73.) 
Previous projects. See page 1375 of Annual Report of 
1962. 
Existing project. See table 29-C. 
Project depth is referred to low-water datum for 
Lake Michigan, 576.8 feet above mean water level at 
Father Point, Quebec (International Great Lakes 
Datum-1955). Fluctuations of water level are seasonal 
changes of about one-half foot above or below annual 
mean stage, and extreme fluctuations of a temporary 
nature, due to wind and barometric pressure, of several 
feet above or below mean lake level prevailing at the 
time. Costs of completed project are $603,021, Federal, 
and $9,000 non-Federal, exclusive of amount expended 
on previous projects. Uncompleted portion (estimated 
$200,000-July 1965) of 1935 River and Harbor Act is 
considered inactive, and excluded from present cost 
estimate. A portion of 1960 River and Harbor Act is 
also considered inactive and cost of this portion, 
(turning basin at Fisherman's Point) was $29,000 
(Mar. 1961) and excluded from present cost estimate. 
(See table 29-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Two car-ferry slips, a petroleum 
tank farm, an engineer base, and several fishing 
wharves. Facilities are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys by hired labor cost $5,244. U. S. 
Dipper Dredge Kewaunee operations in October 1969 
removed 54,750 cubic yards of material at a cost of $64, 
321. Total maintenance costs were $69,565. 
Condition at end of fiscal year. Active portion of existing 
project is complete. The north pier was completed in 
1897 and is in generally good condition. Rehabilitation 
of the south pier was completed in June 1967. 
Construction of north breakwater and shore connection, 
except for a gap of 150 feet about 830 feet from 
shoreward end, and removal of outer 706.5 linear feet 
of north pier were commenced in September 1935 and 
completed in June 1937. Removed 500 linear feet of 
north pier in April-May 1963 and widened and 
deepened the adjacent channel in 1965. Dredging 
entrance channel and interior basin to existing project 
depth was commenced in April and completed in 
October 1938. Controlling depth at low water datum is 
20 feet or more in entrance channel and channel 
between piers, 20 feet over an area 400 by 500 feet in 
the interior turning basin, 20 feet in northerly channel 
extension and in north basin. Kewaunee River is 
navigable fo r about 6.5 miles above mouth for craft 
drawing not more than 4 feet. Total cost of existing 
project to June 30, 1970 was $2,452,350, of which $603, 
021 was for new work ($183,021) regular and $420,000 
emergency relief funds) $1,232,029 regular funds for 
maintenance and $617,300 regular funds for rehabilitation. 
12. MANITOWOC HARBOR, WIS. 
Location. On West shore of Lake Michigan about 79 
miles north of Milwaukee and about 106 miles from 
Green Bay via Sturgeon Bay Canal. (See Lake Survey 
Chart 735.) 
Previous projects. See page 1379 of Annual Report for 
1962. 
Existing project. See table 29-C. 
For detailed description see page 1228, Annual 
Report for 1963. Project depth is referred to low-water 
datum for Lake Michigan, 576.8 feet above mean 
water level at Father Point, Quebec (International 
Great Lakes Datum-1955). Fluctuations of water 
level are seasonal changes of about one-half foot above 
or below annual mean stage, and extreme fluctuations 
of a temporary nature, due to wind and barometric 
pressure of several feet above or below mean lake level 
prevailing at the time. Estimated costs (1970) are $1, 
668,000 Federal and $336,000 non-Federal, which 
includes a cash contribution of $18,000, exclusive of 
amounts expended on previous projects. (See table 29- 
B for authorizing legislation.) 
Local cooperation. Fully complied with for completed 
modifications. For River and Harbor Act of 1962 local 
interests must hold the United States free from 
damages; provide lands and rights-of-way including 
spoil disposal areas, for construction and future 
maintenance, provide and maintain depths in berthing 
areas and local access channels serving terminals 
commensurate with depths provided in related project 
areas; and accomplish required alterations in sewer, 
water supply, drainage, and other utility facilities, 
including maintenance. Formal assurances have not 
been requested. City of Manitowoc has ability to 
cooperate with the Federal Government on proposed 
project and is willing to do so, formal assurance will be 
furnished when necessary. 
Terminal facilities. Three car-ferry slips, a grain 
elevator, 2 shipbuilding yards, and three other wharves 
used for handling coal, building materials, cement, and 
miscellaneous commodities. While these facilities are 
considered fairly adequate for existing commerce, it is 
believed the city should provide a suitable wharf with 
warehouse and railway connection open to the general 
public. 
862

CHICAGO, ILL., DISTRICT 
Operations and results during fiscal year. New work: 
Planning for 1962 modification was started at a cost of 
$2,336. Planning for 1968 modification (Sec. 107) was 
continued at a cost of $98. Total new work costs were 
$2,434. 
Maintenance: Condition surveys and engineering 
and design were made by hired labor at a cost of $4, 
886. U. S. Dipper Dredge Kewaunee operations in 
August 1969 removed 53,950 cubic yards of material at 
a cost of $47,357. Repairs to the north breakwater were 
made by hired labor in July 1969 by placement of 1,927 
tons of stone at a cost of $18,714. Total maintenance 
costs were $70,957. 
Condition at end of fiscal year. Existing project is about 
30 percent complete. The 1962 and 1968 modifications 
remain to be completed. The breakwaters, completed 
in 1910, are in generally fair condition, except at outer 
ends which require repairs. Dredging a channel 
through outer basin to existing project depth, and 
removal of a portion of old north stub pier at the river 
entrance, were completed in December 1937. Dredging 
river channel was completed in July 1942. Controlling 
depths for practicable widths at low water datum are 
23 feet or more in lake approach channel and 21 feet or 
more in channel through outer basin and in the river to 
upstream limit of project. Costs of existing project were 
$477,593 for new work and $1,509,437 for maintenance, 
a total of $1,987,030. 
13. MENOMINEE HARBOR AND RIVER, 
MICH. AND WIS. 
Location. On west shore of Green Bay, about 49 miles 
northeast of Green Bay Harbor, and about 155 miles 
from Milwaukee via Sturgeon Bay Canal. (See Lake 
Survey Chart 723.) 
Previous projects. See page 1361-2 of Annual Report 
for 1962. 
Existing project. See table 29-C. 
For detailed description see page 1214, Annual 
Report for 1963. Project depths are referred to lowwater 
datum for Lake Michigan, which is 576.8 feet 
above mean water level at Father Point, Quebec 
(International Great Lakes Datum-1955). Fluctuations 
of water level are seasonal changes of about 
one-half foot above or below annual mean stage, and 
extreme fluctuations of a temporary nature, due to 
wind and barometric pressures, of several feet above or 
below the mean lake level prevailing at the time. The 
portion authorized by 1960 River and Harbor Act is 
inactive and estimated (1964) at $442,000, Federal, 
and $105,000 non-Federal. Costs of completed new 
work exclusive of inactive work and amount expended 
on previous projects are $221,053 Federal and $50,762 
non-Federal, which includes a cash contribution of 
$36,762. (See table 29-B for authorizing legislation.) 
Local cooperation. Fully complied with for completed 
work. For July 14, 1960 Act, local interests must 
provide lands and rights-of-way for construction and 
future maintenance, hold the United States free from 
damages; and provide and maintain depths in berthing 
areas adjacent to stone and coal docks commensurate 
with depths in Federal project area. 
Terminal facilities. There are 9 wharves for handling 
coal, limestone, pulp and miscellaneous commodities. 
City of Marinette provided a public wharf. Facilities 
are considered fairly adequate for existing commerce, 
except that there is need for a public wharf owned by 
city of Menominee, with warehouse and railway 
connection. 
Operations and results during fiscalyear. New work: 1967 
Modification, H.L. Dredging is complete. Credit of 
$138 was realized in costs. 
Maintenance: Condition surveys were made by 
hired labor at a cost of $4,280. 
Condition at end of fiscalyear. The project in effect prior 
to the modification of March 2, 1945 was completed in 
1938. No additional work was necessary under the 
modification of March 2, 1945 to provide a depth of 12 
feet in the extension of the channel to the vicinity of the 
Marinette Yacht Club as project depth or more was 
available. The entrance piers were completed in 1884, 
and were rehabilitated (1954-1964) and are in excellent 
condition. Dredging of the channel below the 
Marinette municipal wharf, together with enlarging 
the turning basin to existing project depth, was 
commenced in May 1938 and completed in November 
1938. The north pier is maintained for a length of 
about 1,202 feet. The modification of the project 
authorized by the 1960 R. & H. Act is in an inactive 
category. Construction for the 1967 Modification was 
started August 17, 1968 and completed in October 
1968. 
The controlling depths at low water datum were 23 
feet in the entrance channel to 21 feet or more between 
the piers; thence generally 21 feet or more through the 
channel to the Marinette municipal wharf; and in the 
turning basin thence; thence 19 feet for 1,100 feet in the 
river to just above the Marinette Marine Corp.; thence 
12 feet to a point 300 feet east of the upper limit of the 
project; thence 7.8 feet to project limit. 
The costs under the existing project to June 30, 1970 
were $221,053 for new work, $1,079,122 for maintenance 
and $1,351,852 for rehabilitation, a total of $2, 
652,027. 
14. MICHIGAN CITY HARBOR, IND. 
Location. Northwestern Indiana (in La Porte County), 
on southeast shore of Lake Michigan, 38 miles 
southeast of Chicago Harbor. (See Lake Survey Chart 
75.) For descriptions, see page 1482 of Annual Report 
for 1932. 
Previous projects. See page 1407 of Annual Report for 
1962. 
Existing project. See table 29-C. 
863

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Project depth is referred to low-water datum for 
Lake Michigan, 576.8 feet above mean water level at 
Father Point, Quebec (International Great Lakes 
Datum-1955). Seasonal fluctuations in mean stage 
from low water in winter to high water in summer 
average about 1.2 feet. Local and temporary fluctuations 
of 0.1 and 0.5 foot, due to wind and difference 
in barometric pressures, occur daily. Seiches of 3 to 4 
feet occur at infrequent intervals. 
Costs of completed new work are $1,256,257 Federal, 
exclusive of amount expended on previous project and 
$37,800 non-Federal, which includes a cash contribution 
of $30,800. (See table 29-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Four fish docks, one city dock, and 
one grain elevator in this harbor. Commodities 
handled at this harbor are salt and fresh fish. There are 
three small boatyards, which repair and construct 
recreational craft only. One public dock is owned by 
city and has not been used for commercial purposes. 
Operations and results during fiscal year. Maintenance: 
Condition surveys by hired labor cost $3,984. U. S. 
dipper dredge Kewaunee operations in June 1970 
removed 45,075 cubic yards of material at a cost of $66, 
037. Total maintenance costs were $70,021. 
Rehabilitation: Steel sheet piling was purchased for 
Stage II of the rehabilitation of the entrance piers at a 
cost of $143,685. 
Condition at end of fiscal year. Existing project is 
complete. Concrete superstructure, 1,304 feet, on 
detached breakwater, completed in 1925, and entrance 
piers were completed in 1931. Rehabilitation of the 
detached breakwater by conversion to a rubblemound 
was completed in 1969 and the structure is in excellent 
condition. Rehabilitation of portions of the entrance 
piers hae also been completed and are in excellent 
condition. The remainder of the entrance piers were 
completed in 1930 and are in poor condition. Under 
permit from Secretary of War, the Northern Indiana 
Public Service Co. removed 615 feet of inner end of 
west pier and about 719 feet of bulkhead south of pier, 
and replaced them with a steel sheet pile bulkhead 
located landward of former dock line. Area channelward 
of new bulkhead was dredged by permittee to 
18 feet. Controlling depth for practicable widths is 18 
feet in entrance channel and between piers to Franklin 
Street Bridge, 10 feet from the Franklin Street Bridge 
gradually reducing to about 5 feet at the upper turning 
basin with the turning basin having shoaled above 
datum, and 6 feet from the upper turning basin 
reducing to about 2 feet at E Street Bridge. Available 
anchorage depths in the outer basin are 12 feet in 
northerly portion and 8 feet in southerly portion. 
Depths are referred to low--water datum. Head of 
navigation for deep-draft commercial vessels and 
barges is at Franklin Street Bridge, and for shallow 
draft commercial fishing launches is at the E Street 
Bridge at head of project, 1.45 miles above outer end of 
west pier. Above this point, depths are sufficient only 
for small shallow draft launches. Total costs of existing 
project were $4,707,388, of which $1,256,257 was for 
new work and $2,407,050 for maintenance, and $1,044, 
031 for rehabilitation. 
15. MILWAUKEE HARBOR, WIS. 
Location. On west shore of Lake Michigan about 85 
miles north of Chicago and about 83 miles west of 
Grand Haven, Mich. (See Lake Survey Chart 743.) 
Previous projects. See page 1385 of Annual Report for 
1962. 
Existing project. See table 29-C. 
For detailed description see page 1232 of Annual 
Report for 1963. Project depth is referred to low-water 
datum for Lake Michigan, 576.8 feet above mean 
water level at Father Point, Quebec (International 
Great Lakes Datum-1955). Fluctuations of water level 
are seasonal changes of about one-half foot above or 
below annual mean stage and extreme fluctuations of 
temporary nature, due to wind and barometric 
pressure, of about 1.5 feet above or below mean lake 
level prevailing at the time. 
Estimated costs (1970) are $7,057,000, Federal and 
$1,648,000, non-Federal, exclusive of amount expended 
on previous projects. Uncompleted portion of 
1945 River and Harbor Act is considered inactive and 
excluded from foregoing estimate. Estimated cost 
(1960) of this portion is $225,000. (See table 29-B for 
authorizing legislation.) 
Local cooperation. Complied with for acts of March 2, 
1945, October 23, 1962, and July 14, 1960, except 
inactive portion of 1945 act. Act of August 30, 1965, 
provided that original dredging of outer harbor area be 
done by city of Milwaukee and city of Milwaukee be 
reimbursed at actual cost but not to exceed 10 cents per 
cubic yard, place measurement, for original dredging 
done subsequent to authorization of work by Congress. 
Agreement covering dredging was e xecuted by 
Secretary of War, February 23, 1934, after this work 
was originally authorized as part of public works 
program. City was reimbursed for 10 percent of 
dredging. 
Terminal facilities. Four car-ferry slips, and 57 other 
wharves, private and municipal, used for handling 
coal, grain, building materials, cement, petroleum 
products, and miscellaneous commodities. As facilities 
in inner harbor were inadequate for existing commerce, 
Milwaukee Harbor Commission has constructed 
nine docks for handling general cargo. 
Operations and results during fiscal year. Maintenance: 
Condition surveys were performed by hired labor at a 
cost of $17,205. Repairs were made to portions of the 
south breakwater in August to October 1969 by 
placement of 3,020 tons of stone at a cost of $30,704. 
Repairs were made to a portion of the north shore 
connection breakwater in November 1969 and May to 
864

CHICAGO, ILL., DISTRICT 
June 1970 by placement of 8,891 tons of stone at a cost 
of $135,317. Total maintenance costs were $183,226. 
Condition at end of fiscal year. Existing project is about 
98 percent complete. The 1962 modification was 
completed in July 1967. The 1960 modification was 
completed in November 1962. North breakwater, 9,954 
feet long, was completed in August 1925. North pier 
was completed in 1905 and construction of south pier 
was completed in November 1910. Construction of 
south breakwater and shore connection was completed 
in October 1929. Before modification of August 30, 
1935, city of Milwaukee dredged most of the area in the 
outer harbor south of inner entrance piers and 
lakeward of pierhead line to more than 21 feet below 
datum without cost to the United States. City of 
Milwaukee also dredged a portion of the area in the 
outer harbor north of inner entrance piers to provide 
an approach channel to the passenger and auto pier 
opposite East Clybourn Street. Work on the 1945 
modification was completed in August 1957, except for 
inactive portion which consists of dredging the Milwaukee 
River from Buffalo Street to the upper limit of 
the project at Humboldt Avenue. Northerly 3,000 feet 
of north breakwater is in poor condition. The remainder 
of north breakwater is in generally good 
condition. South breakwater and shore connections are 
in generally good condition. Controlling depths at lowwater 
datum are 30 feet in approach channel; 28 feet in 
the entrance channel and south outer harbor; 27 feet in 
Milwaukee River to C. & N. W. Ry. bridge; 21 feet to 
Buffalo Street bridge and about 18 feet thence to head 
of project; 27 feet in Kinnickinnic River to C. & N. W. 
Ry. bridge and 21 feet to head of project east of the 
Kinnickinnic Avenue bridge; 21 feet in Menomonee 
River to head of project, and 21 feet in the South 
Menomonee Canal and Burnham Canal to head of 
project in these channels. Costs of existing project were 
$6,937,804 for new work, $4,660,098 for maintenance, 
and $1,891,810 for rehabilitation, a total of $13,489, 
712. 
16. NEW BUFFALO HARBOR, MICH. 
Location. At mouth of Galien River on southeast shore 
of Lake Michigan in Berrien County, about 45 miles 
easterly from Chicago, Ill. (See Lake Survey Chart 75.) 
Existing project. Provides for an entrance channel 10 
feet deep by 80 to 180 feet wide and 850 feet long, to 
mouth of Galien River; new north and south breakwaters 
1,400 and 860 feet long, respectively, and 
deepening inner channel to Galien River to 8 feet and 
80 feet wide and 1,250 feet long. Project was authorized 
by River and Harbor Act of 1962. Project depth is 
referred to low-water datum for Lake Michigan, which 
is 576.8 feet above mean water level at Father Point, 
Quebec (International Great Lakes Datum-1955). 
Estimated costs (1970) are $1,040,000 Federal and $1, 
622,000 non-Federal, which includes a cash contribution 
of $960,000. Total project cost is $2,662,000. 
Local cooperation. Local interests must contribute in 
cash 48 percent of the first cost of construction of the 
general navigation facilities, such contribution presently 
estimated (July 1970 price levels) at $960,000 to 
be paid in a lump sum before start of construction, 
subject to final adjustment after actual costs are 
determined; provide lands and rights-of-way for 
construction and future maintenance of project and 
aids to navigation upon request of the Chief of 
Engineers, including suitable spoil-disposal areas; hold 
the United States free from damages; provide and 
maintain necessary mooring facilities open to all 
equally, and including dredging berthing areas to 
depths commensurate with related projects depths; and 
reserve mooring facilities adequate for accommodation 
of transient craft. Formal assurances were requested in 
December 1965. Michigan State Waterways Commission 
stated it would provide the cash contribution 
and coordinate local efforts to meet other cooperation 
requirements. Contributed funds were received on 
June 14, 1967. 
Terminal facilities. One village owned boat ramp and 
three privately operated marinas and a private boat 
club facility. 
Operations and results during fiscal year. New work: 
Engineering and design was continued by hired labor 
at a cost of $10,274. 
Condition at end of fiscal year. Construction not started. 
17. OCONTO HARBOR, WIS. 
Location. On the west shore of Green Bay, about 31 
miles northeasterly from Green Bay Harbor, Wis., and 
about 25 miles southwesterly from Menominee Harbor, 
Mich. and Wis., at mouth of Oconto River. (See 
U.S. Lake Survey Chart No. 703.) 
Previous projects. For details see page 1187 of Annual 
Report for 1958. 
Existing project. See Table 29-C. 
For detailed description see page 1187, Annual 
Report for 1958. Project depth is referred to low-water 
datum for Lake Michigan, which is 576.8 feet above 
mean tide at Father Point, Quebec (International 
Great Lakes Datum-1955). 
The fluctuations of water level are seasonal changes 
of about one-half foot above or below annual mean 
stage and extreme fluctuations of a temporary nature 
due to wind and barometric pressure, of about 1.5 feet 
above or below mean lake level prevailing at the time. 
See table 29-B for authorizing legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. Two municipally owned wharves of 
400- and 100-foot frontage, respectively, for miscellaneous 
freight, open to general public use. Facilities 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys were performed by hired labor at a 
cost of $2,788. Engineering studies for rehabilitation of 
865

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
the south pier were performed by hired labor at a cost 
of $9,526. Total maintenance costs were $12,314. 
Condition at end of fiscal year. Existing project was 
completed in 1912. Piers were completed in 1885. 
Dredging channel and turning basin to existing project 
depth was commenced in July 1911 and completed in 
May 1912. The north pier was rebuilt as a rubblemound 
by local interests in 1967. South pier is in 
poor condition. Controlling depths at low-water datum 
are 8 feet in entrance channel, 6 feet between piers and 
5 feet in the turning basin. 
Total costs for existing project to June 30, 1970 were 
$46,185 for new work and $152,848 for maintenance, a 
total of $199,033. 
18. PORT WASHINGTON HARBOR, WIS. 
Location. On the west shore of Lake Michigan, about 
53 miles south of Manitowoc and about 29 miles north 
of Milwaukee. (See Lake Survey Chart 74.) 
Previous projects. For details, see page 1938 of Annual 
Report for 1915, and page 1459 of Annual Report for 
1938. 
Existing project. See table 29-C. 
Project depth is referred to low-water datum for 
Lake Michigan, which is 576.8 feet above mean water 
level at Father Point, Quebec (International Great 
Lakes Datum-1955). The fluctuations of water level 
are seasonal changes of about one-half foot above or 
below the annual mean stage, and extreme fluctuations 
of a temporary nature, due to wind and barometric 
pressure, of several feet above or below the mean lake 
level prevailing at the time. New work for completed 
project cost $810,709, exclusive of amounts expended 
on previous projects. The 1958 River and Harbor Act 
portion is considered inactive and excluded from 
foregoing costs. Estimated cost of this portion (1960) is 
$2,750,000. (See table 29-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There is one coal wharf, a petroleum 
tank farm and several fis hing wharves. City 
provided a wharf which is open to public use. Facilities 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys and engineering and design studies 
performed by hired labor at a cost of $1,903. U. S. 
Dipper Dredge Kewaunee operations in July 1969 
removed 11,550 cubic yards of material at a cost of $16, 
133. Total maintenance costs were $18,036. 
Condition at end of fiscal year. Existing project was 
completed in 1936, except for inactive portion of 1958 
modification. Construction of north breakwater and 
removal of outer portion of north pier were commenced 
in April and completed in December 1934. Dredging 
entrance channels, outer turning basin, and interior 
basins to existing project depth, was commenced in 
July and completed in December 1934. Construction of 
south breakwater was commenced in July and completed 
in October 1936. Breakwaters and north stub 
pier are in good condition. Original south pier, 
completed in 1893, was entirely removed in 1932 by 
private interests under permit granted October 25, 
1930, by Secretary of War and replaced with coal 
wharf. A south rubblemound breakwater about 500 
feet long was constructed in 1934 by private interests as 
an extension of their coal wharf in accordance with 
local cooperation requirements of House Document 
168, 72d Congress, 1st session. Controlling depths at 
low-water datum are 21 feet in entrance channel and 
21 feet in turning basin. Interior basins had controlling 
depth is of 14 feet in west basin and 18 feet in north 
basin. Area between south line of Government entrance 
channel and the harbor face of private coal 
wharf, which is maintained by private interests, had a 
controlling depth of about 22 feet. 
Total cost of existing project to June 30, 1970 was $1, 
206,358 of which $810,709 was for new work ($207,714 
regular funds and $602,995 public works funds), and 
$395,649 regular funds for maintenance. 
19. RACINE HARBOR, WIS. 
Location. On west shore of Lake Michigan about 26 
miles south of Milwaukee and about 64 miles north of 
Chicago. (See Lake Survey Chart 745.) 
Previous projects. See page 1389 of Annual Report for 
1962. 
Existing project. See table 29-C. 
For detailed description see page 1235, Annual 
Report for 1963. Project depth is referred to low-water 
datum on Lake Michigan, 576.8 feet above mean water 
level at Father Point, Quebec (International Great 
Lakes Datum-1955). Fluctuations of water level are 
seasonal changes of about one-half foot above or below 
annual mean stage, and extreme fluctuations of a 
temporary nature, due to wind and barometric 
pressure, of several feet above or below mean lake level 
prevailing at the time. New work for project as 
completed cost $777,775, exclusive of amounts expended 
on previous projects and exclusive of inner 300 
linear feet of pile pier and 450 linear feet of rubblemound, 
originally part of south breakwater but no 
longer considered necessary. (See table 29-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Five wharves used for handling 
coal, limestone, petroleum products, and fish. City 
provided a public wharf. 
Operations and results during fiscal year. New Work: 
Rehabilitation: Contract for riprap was awarded in 
May 1970. Maintenance: Condition surveys were 
performed by hired labor at a cost of $3,586. Engineering 
and design studies in connection with 
rehabilitation of breakwaters cost $12,302. Repairs 
were made to the north breakwater by hired labor in 
August 1969 by placement of 851 tons of stone at a cost 
of $19,247. Total maintenance costs were $35,135. 
866

CHICAGO, ILL., DISTRICT 
Condition at end of fiscal year. Existing project substantially 
completed in 1946. Construction of north 
breakwater and shore connection was completed in 
November 1918. Removal of old north pier was 
completed in 1913. Construction of south breakwater 
and shore connection and removal of old south pier 
were commenced in June 1916 and completed in 
December 1924. Removal of outer shoals, widening 
and deepening channel through outer basin to existing 
project depth and width, and dredging river channel 
began in July and completed in November 1946. 
Concrete superstructure on portions of north breakwater 
and shore connections and timber substructures 
of portions of south breakwater and south stub pier are 
disintegrating and require repairs. Controlling depths 
at low-water datum are 22 feet in entrance channel, 
generally 20 feet through outer basin except for lesser 
depths in scattered shoals and along northerly and 
southerly sides of outer basin; 19 feet in the river 
channel to the Main Street Bridge, then 15 feet to the 
State Street Bridge and then 8 feet to the upper limit of 
the project. Costs of existing project were $777,775 for 
new work and $1,122,360 for maintenance, a total of 
$1,900,135. 
20. SHEBOYGAN HARBOR, WIS. 
Location. On west shore of Lake Michigan about 26 
miles south of Manitowoc and about 55 miles north of 
Milwaukee. (See Lake Survey Chart 735.) 
Previous projects. See page 1381 of Annual Report for 
1962. 
Existing project. See table 29-C. 
for detailed description see page 1230, Annual 
Report for 1963. Project depth is referred to low-water 
datum for Lake Michigan, which is 576.8 feet above 
mean water level at Father Point, Quebec 
(International Great Lakes Datum-1955). Fluctuations 
of water level are seasonal changes of about one-half 
foot above or below annual mean stage and extreme 
fluctuations of a temporary nature due to wind and 
barometric pressure of about 1.5 feet above or below 
mean lake level prevailing at the time. New Work for 
project as completed cost $648,271, exclusive of 
amounts expended on previous projects. (See table 29- 
B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Three wharves for handling coal, 
petroleum products and miscellaneous commodities. 
City provided a public wharf. Facilities considered 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys performed by hired labor cost $3, 
016. U. S. Dipper Dredge Kewaunee operations in July 
1969 removed 53,525 cubic yards of material at a cost 
of $49,109. Repairs were made to the north breakwater 
by hired labor in July 1969 by placement of 1,986 tons 
of stone at a cost of $31,308. Total maintenance costs 
were $83,433. 
Condition at end of fiscal year. Existing project was 
completed in December 1956. South pier was completed 
in 1904. Construction of north breakwater was 
commenced in October 1913 and completed in 
October 1915. Dredging turning basin was commenced 
in October 1928 and completed in September 1931. 
Dredging entrance channel to existing project depth 
was commenced in June and completed in July 1938. 
Work on 1954 modification was completed in December 
1956. Piers and breakwaters are in generally 
good condition. Inner 260 feet of south pier replaced 
with a revetment by private interests under permit 
granted July 16, 1931, by Secretary of War. Pier is 
therefore maintained only for a length of about 2,490 
feet. Controlling depths at low-water datum are about 
24 feet in approach channel, 21 feet in entrance 
channel and 20 feet in basin; thence about 21 feet to 
8th St.; thence about 11 feet to Jefferson Avenue, the 
upper limits of the project. Sheboygan River is 
navigable about 2.4 miles above its mouth for craft 
drawing not more than 2 feet. Costs of existing project 
were $648,271 for new work, $1,353,579 for maintenance 
and $609,028 for rehabilitation, a total of $2, 
610,878. 
21. STURGEON BAY AND LAKE 
MICHIGAN SHIP CANAL, WIS. 
Location. On west shore of Lake Michigan about 52 
miles northeast of Green Bay and about 128 miles 
north of Milwaukee. (See Lake Survey Chart 728.) 
Previous projects. See page 1373 of Annual Report for 
1962. 
Existing project. See table 29-C. 
For detailed description see page 1223, Annual 
Report for 1963. Project depth is referred to low-water 
datum for Lake Michigan, 576.8 feet above mean 
water level at Father Point, Quebec (International 
Great Lakes Datum-1955). Fluctuations of water level 
are seasonal changes of about one-half foot above or 
below annual mean stage, and extreme fluctuations of 
a temporary nature, due to wind and barometric 
pressure, of several feet above or below mean lake level 
prevailing at the time. (See table 29-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. As the canal and connecting 
channel is a through waterway, only terminal facilities 
are in city of Sturgeon Bay, 4 miles from west end of 
revetted portion of canal. These facilities consist of two 
wharves for handling coal, petroleum products and 
miscellaneous commodities and four shipbuilding 
yards. City of Sturgeon Bay provided a public wharf. 
There is also a large inactive stone wharf about 5 miles 
northwesterly from city of Sturgeon Bay. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys were performed by hired labor at a 
cost of $12,689. U. S. Dipper Dredge Kewaunee 
867

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
operations in September 1969 removed 69,925 cubic 
yards of material at a cost of $67,652. Repairs to the 
north breakwater were made by hired labor by 
placement of 2,140 tons of stone in July and August 
1969 at a cost of $21,525. Total maintenance costs were 
$101,866. 
Condition at end of fiscal year. Existing project was 
completed in 1946. Breakwaters were completed in 
1880, and canal revetments in 1903. Dredging and rock 
removal at east entrance to canal and dredging in west 
section of canal, to existing project depth, were 
commenced in May and completed in September 1940. 
Deepening and widening middle section of canal to 
existing project depth and width was commenced in 
May and completed in August 1942. Dredging turning 
basin was commenced in June and completed in July 
1946. Breakwaters are in good condition. North 
revetment and sections of south revetment have been 
rehabilitated and are in good condition. Remainder of 
south revetment is in fair condition and requires repair. 
Controlling depths for practicable widths at low water 
datum are 23 feet in entrance channel and revetted 
canal, 22 feet in channel in Sturgeon Bay, and 20 feet 
in turning basin. Costs to June 30, 1970 for existing 
project were $736,303 for new work, $3,405,624 for 
maintenance, and $884,899 for rehabilitation, a total 
of $5,026,826. In addition, $235,940 was expended 
between April 25, 1893, and June 30, 1917, on 
operating and care of works of improvement under 
provision of permanent indefinite appropriations for 
such purposes. 
22. TWO RIVERS HARBOR, WIS. 
Location. On west shore of Lake Michigan about 82 
miles north of Milwaukee and about 101 miles from 
Green Bay via Sturgeon Bay Canal. (See Lake Survey 
Chart 73.) 
Previous projects. See page 1377, Annual Report for 
1962. 
Existing project. See table 29-C. 
For detailed description see page 1226 of Annual 
Report for 1963. Project depth is referred to low-water 
datum for Lake Michigan, 576.8 feet above mean 
water level at Father Point, Quebec (International 
Great Lakes Datum- 1955). Fluctuations of water level 
are seasonal changes of about one-half foot above or 
below annual mean stage and extreme fluctuations of a 
temporary nature, due to wind and barometric 
-pressure, of several feet a bove or below mean lake level 
prevailing at the time. Completed project cost $147,463 
exclusive of the amount expended on previous projects. 
The 1935 River and Harbor Act portion of project is 
considered inactive. Estimated cost of this portion 
(1954) is $14,000. (See table 29-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. A coal wharf and several fishing 
wharves. City provided a wharf for receipt of petroleum 
products and public use. Facilities considered 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys and engineering and design were 
performed by hired labor at a cost of $4,155. 
Condition at end of fiscal year. Existing project is 
complete except for inactive portion of project which 
consists of dredging a 10-foot width along each side of 
lakeward portion of entrance channel between the 
piers. This dredging was omitted to avoid removal of 
necessary riprap along entrance piers. Present width of 
channel is considered adequate for present and 
reasonably prospective commerce. South pier was 
completed in 1883 and is in generally good condition. 
North pier was completed in 1908. North revetment, 
completed in 1917, was rebuilt May to August 1962. 
Dredging entrance channel and inner basin to existing 
project depth was commenced in March and substantially 
completed in May 1937. Controlling depth 
at low water datum is 18 feet or more in entrance 
channel 18 feet in channel between piers, 18 feet in 
inner basin, and 6 feet or more in East Twin River to 
22d Street. East and West Twin Rivers are navigable 
for about 3 and 7 miles, respectively, from the harbor 
piers for craft drawing not more than 4 feet. Costs to 
June 30, 1970, for existing project were $147,463 for 
new work and $1,614,167 for maintenance, a total of 
$1,761,630. In addition, $58,057 were costed for minor 
rehabilitation. 
23. WAUKEGAN HARBOR, ILL. 
Location. On west shore of Lake Michigan about 51 
miles south of Milwaukee and about 38 miles north of 
Chicago. (See Lake Survey Chart 74.) 
Previous projects. See page 1392, Annual Report for 
1962. 
Existing project. See table 29-C. 
For detailed description see page 1239, Annual 
Report for 1963. Project depth is referred to low-water 
datum for Lake Michigan, 576.8 feet above mean 
water level at Father Point, Quebec (International 
Great Lakes Datum-1955.) Fluctuations of water level 
are seasonal changes of about one-half foot above or 
below the annual mean stage, and extreme fluctuations 
of a temporary nature, due to wind and barometric 
pressure, several feet above or below mean lake level 
prevailing at the time. Costs of completed project are 
$604,793 Federal and $88,000 non-Federal, exclusive 
of amount expended on previous projects. (See table 
29-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Four commercial docks receive 
coal, cement and gypsum. In addition, there are three 
publicly owned docks, one owned by city and used for 
fishing, and the other two owned by the Waukegan 
Port District. There is one boat yard for recreational 
craft. City dock is considered adequate for existing 
commerce. 
868

CHICAGO, ILL., DISTRICT 
Operations and results during fiscal year. Maintenance: 
Condition surveys were performed by hired labor at a 
cost of $3,965. Repairs to the north breakwater were 
made by hired labor by placement of 2,007 tons of 
stone in August 1969 at a cost of $20,568. 
Condition at end of fiscal year. Existing project is 
complete. Anchorage area in southwest corner of inner 
basin (1945 modification) was completed in 1966. 
North pier, completed in 1904, is in good condition. 
South pier, completed in 1903, is in good condition. 
The outer 600 feet of breakwater, completed in 1904, 
and the shorearm extension, completed in 1931, are in 
good condition. Controlling depths for practicable 
widths at low water datum are 22.0 feet in entrance 
channel to outer end of south pier, 18 feet in channel 
between piers and 18 feet in inner basin. Total costs of 
existing project were $2,532,560 of which $604,793 
were for new work and $1,927,767 for maintenance. 
24. RECONNAISSANCE AND CONDITION 
SURVEYS. 
See table 29-L. 
25. OTHER AUTHORIZED NAVIGATION 
PROJECTS. 
See table 29-M. 
26. NAVIGATION ACTIVITIES PURSUANT 
TO SECTION 107, PUBLIC LAW 86-645 
(PREAUTHORIZATION) 
Studies conducted during fiscal year cost $14,569 for 
Port Washington Harbor, Wis. and $65 for High Cliff 
State Park Marina, Wis. 
BEACH EROSION CONTROL 
27. EVANSTON, ILL. 
Location. Along western shore of Lake Michigan, 
within Cook County and adjacent to city of Chicago to 
the south. (See Lake Survey Charts 75 and 751 and 
Geological Survey quadrangle sheet entitled 
"Evanston, Illinois.") 
Existing project. Provides for Federal participation to 
extent of one-third of first cost of construction for 
placement of 45,000 cubic yards of sandfill and 
construction of a jetty 600 feet long at Clark Street 
Beach, placement of 30,000 cubic yards of sandfill and 
construction of a jetty 200 feet long at Dempster Street 
Beach, placement of 50,000 cubic yards of sandfill and 
construction of ajetty 425 feet long at Lee Street Beach 
and construction of 4,130 feet of riprap protection 
along publicly owned shore except at Lee Street Beach 
and south of South Blvd. Federal participation to 
extent of 70 percent of first cost for construction at 
Grosse Point Park Beach of an impermeable steel 
sheet-pile groin 600 feet long and placement of sandfill 
extending about 525 feet north of groin, varying in 
width from 300 feet at groin to 75 feet at north end and 
Federal participation to extent of 50 percent of first cost 
for modification of protection at South Boulevard 
Beach by construction of an impermeable steel sheetpile 
groin 600 feet long and placement of sandfill 
extending about 800 feet north of groin, varying in 
width from 200 feet at groin to 50 feet at north end. 
Completed work at Clark Street, Dempster Street, and 
Lee Street Beaches and 4,131 feet of riprap protection 
cost $267,267 Federal and $534,535 non-Federal, a 
total of $801,802. Estimated cost (July 1970) for new 
work at Grosse Point and South Boulevard Beaches is 
$437,000 Federal and $319,000 non-Federal, a total of 
$756,000. (See table 29-B for authorizing legislation.) 
Local cooperation. Fully complied with for work 
authorized by act of September 3, 1954 and for the 
work authorized for Grosse Point Park Beach by the act 
of October 28, 1965. Total costs for local cooperation 
for work authorized by act of September 3, 1954 were 
$534,535. Act of October 28, 1965 requires that local 
interests bear all costs of work in excess of Federal 
contributions recommended; provide necessary lands, 
easements, and rights-of-way; hold the United States 
free from damages due to the construction works; 
maintain all works after completion in accordance with 
regulations prescribed by the Secretary of the Army; 
maintain during economic life of project continued 
public ownership and administration for public use of 
publicly owned shores upon which the recommended 
Federal participation is based; maintain at the Grosse 
Point Park beach conditions that will exclude permanent 
human habitation including summer residences, 
preserve the natural protective features of the 
beach and inshore lands, and provide essentially full 
park facilities for appropriate public use including a 
suitable recreational beach all of which shall meet with 
the approval of the Chief of Engineers; provide 
appurtenant facilities required for realization of 
recreational benefits; control water pollution to extent 
necessary to safeguard health of bathers; and obtain 
approval of Chief of Engineers, before commencement 
of work, of detailed plans and specifications, and 
arrangements for prosecuting the work. 
Operations and results during fiscal year. Funds in amount 
of $13,215 revoked. 
Condition at end of fiscal year. Work authorized by act of 
September 3, 1954 is completed. Work authorized by 
act of October 25, 1965 is approximately 42 percent 
complete. Only South Boulevard Beach portion 
remains to be accomplished. 
28. AUTHORIZED BEACH EROSION 
CONTROL PROJECTS 
See table 29-N. 
869

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
FLOOD CONTROL 
29. FARM CREEK, ILL. 
Location. Farm Creek watershed in Tazewell County, 
I 11., is 60 square miles in extent. Stream empties into 
Illinois Waterway at mile 162 above mouth. 
Existing project. Two compacted-earth flood-detention 
dams, Fondulac Dam on Fondulac Creek, Tazewell 
County, Ill., about 1.5 miles easterly of East Peoria, Ill., 
and Farmdale Dam on Farm Creek, Tazewell County, 
Ill., about 2.5 miles easterly of East Peoria, Ill., and 
improvements to Farm Creek, Cole Creek, and Kerfoot 
Creek Channels in East Peoria, Ill. Fondulac Dam has 
a maximum height of 67 feet above riverbed and a 
reservoir capacity of 3,780 acre-feet. Farmdale Dam 
has a maximum height of 80 feet above riverbed and a 
reservoir capacity of 15,500 acre-feet. Linear feet of 
channel improvements are: Farm Creek, 12,000 feet; 
Cole Creek, 1,875 feet; Kerfoot Creek, 900 feet. Project 
provides complete protection to residential, business, 
and highly developed industrial areas to East Peoria, 
Ill., against design flows in Farm, Cole, Kerfoot, and 
Dempsey Creeks of expected frequency once in about 
100 years. 
Federal costs of completed project were $9,859,020, 
and contributed funds were $161,813, a total cost of 
$10,020,833. Existing project was authorized by 1944 
Flood Control Act. (See H. Doc. 802, 78th Cong., 2d., 
sess.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Maintenance of remedial works at Fondulac and 
Farmdale Dams was continued by hired labor at a cost 
of $26,736. 
Condition at end of fiscal year. Existing project is 
complete. 
30. MOUTH OF SANGAMON RIVER, ILL. 
Location. On east bank of Illinois River, 98 miles 
above mouth and 9.4 miles above Beardstown Highway 
Bridge. Project extends for several miles upstream 
from mouth of river. This portion of Sangamon River 
forms boundary line between Mason County on the 
northwest and Cass County on the southwest. 
Existing project. Project authorized by 1936 Flood 
Control Act (H. Doc. 186, 72d Cong., 1st sess.) 
provided for excavation of a new outlet channel for 
Sangamon River about 6.7 miles long and 200 feet 
wide extending from Hager Slough on Illinois River to 
mile 6.7 above mouth of Sangamon River, and a 
diversion channel and remedial works necessary for 
maintenance of a highwater table in adjacent wild 
game reserve. Further remedial work authoized by 
Flood Control Act of 1962 (H. Doc. 472, 87th Cong., 2d 
sess.) provides for a small concrete diversion weir, 
channel excavation and clearing. 
Completed costs for work authorized by 1936 Flood 
Control Act are $764,490 Federal costs; $15,122 
contributed funds; lands and damages, non-Federal 
costs $20,000; total $799,612. Estimated costs (July 
1970) for work authorized by the 1962 Flood Control 
Act are $131,000, Federal, $1,000 non-Federal, a total 
of $132,000. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Hired labor operations to clear channels of debris were 
continued at a cost of $23,655. 
Conditon at end of fiscal year. Work authorized by 1936 
Flood Control Act is complete. Remedial work 
authorized by 1962 Flood Control Act remains to be 
completed. 
31. OAKLEY LAKE AND CHANNEL 
IMPROVEMENTS, ILLINOIS 
Location. On Sangamon River, a tributary of Illinois 
River. Damsite is about 1.25 miles upstream from 
Decatur, Illinois. 
Existing project. The project as authorized provides for 
a multiple-purpose dam and reservoir at Oakley site, 
about 1.25 miles above Decatur, Ill. Earth dam to be 55 
feet high and 3,500 feet long. Concrete ogee-gated 
spillway to be 540 feet long. Reservoir capacity to be 
148,000 acre-feet, including tentative allocations of 
132,500 for flood control, 11,000 for water supply and 
recreation, and 4,500 for sedimentation. Project also 
provides for improvement of 98 miles of Sangamon 
River Channel extending from Decatur downstream to 
the mouth of Salt Creek. A proposed alternative plan 
provides for a multiple purpose dam and reservoir at 
the Oakley site, a sub-impoundment near the mouth of 
Friend's Creek about 7.5 miles above the Oakley site 
and a dual use recreation channel and floodway 
extending from Decatur downstream to the mouth of 
Salt Creek. The proposed Oakley dam will be 
compacted earth fill construction about 4,350 feet long, 
55 feet high and employ four tainter gates for 
impounded water releases. The reservoir will have a 
storage capacity of 100,600 acre-feet, with allocation of 
83,600 for flood control, 7,000 for water supply and 10, 
000 for sedimentation. The proposed dam for the 
Friend's Creek Sub-impoundment will be a compacted 
earth fill construction about 2,500 feet long and 55 feet 
high and employ two tainter gates for impounded 
water releases. The reservoir will have a storage 
capacity of 56,900 acre-feet, with allocation of 28,800 
for flood control, 17,100 for water supply, 9,000 for 
recreation and 2,000 for sedimentation. Estimated cost 
(1970) is $68,000,000 and includes a future non- 
Federal reimbursement of $14,027,000. Project was 
authorized by Flood Control Act of 1962 (H. Doc. 472, 
87th Cong., 2d Sess.). 
Local cooperation. 
a. Requirements: For proposed alternative plan local 
interests are required to: (1) agree to pay the first cost 
allocated to water supply, such costs being presently 
estimated at 17.2 percent of the total costs, or $11,696, 
870

CHICAGO, ILL., DISTRICT 
000 to be paid in lump sum prior to construction with 
appropriate adjustments when actual costs are determined; 
or to be paid in installments prior to the 
commencement of pertinent items, in accordance with 
construction schedules as required by the Chief of 
Engineers; or to be paid by annual payments, 
including interest during construction and interest on 
the unpaid balance as determined by the Chief of 
Engineers, over the life of the project, or 50 years, 
whichever is the lesser; (2) agree to pay annually the 
proportionate costs of operation, maintenance and 
periodic replacement of moving parts allocated to 
water supply such costs being presently estimated at 9.0 
percent of the total, or $46,000, subject to any 
modifications to be provided in the water supply 
contract to be executed between the State of Illinois 
and the United States; (3) agree to pay one half of the 
separable costs assigned to recreational stream flow 
regulation, such costs being presently estimated at $1, 
334,000, to be paid in any manner described in (1) 
above; (4) agree to pay annually the proportionate 
costs of operation, maintenance, and periodic replacement 
of moving parts allocated to recreational 
stream flow regulation, such costs being presently 
estimated at 9.4 percent of the total, or $48,000, subject 
to modifications which result from reallocation of such 
costs as required by the water supply contract to be 
executed between the State of Illinois and the United 
States; (5) agree to pay one half of the separable first 
costs assigned to recreation in the greenbelt including 
the project recreational developments outside the 
greenbelt, such costs being presently estimated at $739, 
000 to be paid in any manner described in (1) above; 
(6) agree to operate and maintain and insure public 
access at specified locations to: the recreational 
facilities in the greenbelt, including the project 
recreational developments outside the greenbelt; and 
the recreational areas adjacent to the multiple-purpose 
reservoir system leased to non-Federal interests; all in 
accordance with regulations approved by the Secretary 
of the Army; (7) maintain all roads and bridges in the 
reservoir areas and in the greenbelt in accordance with 
regulations prescribed by the Secretary of the Army; 
(8) hold and save the United States free from all water 
rights claims resulting from construction and operation 
of the project; (9) provide for adequate water pollution 
control at all sources within the watershed in accord 
with the applicable State-Federal Water Quality 
Standards and regulations and procedures of the State 
to prevent pollution of the impounded waters of the 
multiple-purpose reservoir system, and of the greenbelt 
area of the Sangamon River; to insure that the 
reservoirs, the recreation areas and the greenbelt area 
enjoy a high quality environment for the benefit of all; 
(10) administer project lands and waters within the 
greenbelt area, including the recreational development 
outside the greenbelt, to enhance recreation and fish 
and wildlife and to prevent encroachment which would 
reduce the hydraulic capacity of the channel and the 
greenbelt; (11) provide controls against the withdrawal 
of stream flow dedicated to recreational stream flow 
regulation; and (12) provide for operation of the 
existing non-Federal dam and reservoir on the Sangamon 
River at Lake Decatur in accordance with 
regulations developed by the State and Federal 
interests and approved by the Secretary of the Army, 
and require future dams within the watershed to be 
operated in a manner which will not conflict with the 
operation of the project. 
b. The State of Illinois will be the local sponsor for 
the project. The Illinois General Assembly, in the 
spring session of 1970, passed legislation authorizing 
the State of Illinois to furnish the required items of local 
cooperation. 
Operations and results during the fiscal year. Alternatives 
for alleviating flooding at Allerton Park were studied. 
The State of Illinois report entitled "Suggested 
Development, Oakley Reservoir and Sangamon River, 
The Waterway Alternative," was reviewed for economic 
and engineering feasibility. A report on the 
State's alternative plan was prepared. This report was 
completed in May 1970. Federal cost during the fiscal 
year were $224,936. 
Condition at the end of fiscal year. Construction has not 
started. 
32. PEORIA, ILLINOIS 
Location. The project is located at Peoria, Illinois in 
Peoria County, on the Illinois River. 
Existing project. Provides for protection for city of 
Peoria by construction of a system of earth levees, 
concrete flood wall, two pumping plants and modifications 
to existing interior drainage facilities. Total 
length of protection is 26,400 feet of which 7,550 feet is 
new levee, 15,750 feet is new concrete wall and 3,100 
feet is existing levee at the sewage treatment plant. 
Estimated cost (1970) is $20,200,000 Federal; and $2, 
990,000 non-Federal; total $23,190,000. Project was 
authorized by Flood Control Act of 1962 (H. Doc. 472, 
87th Cong., 2d sess.) Latest published map is in the 
house document. 
Local cooperation. Local interest must furnish without 
cost to the United States all lands, easements, rights-ofway, 
and ponding and spoil-disposal areas necessary 
for construction of the project, hold and save the 
United States free from damages due to construction 
works, bear the expense of relocating and altering 
highways, highway bridges (except underpinning), 
utilities, buildings, interior drainage facilities, pipelines, 
and other structures, except railroad bridges and 
approaches, prescribe and enforce regulations satisfactory 
to the Secretary of the Army to prevent 
encroachment to the improved channels and ponding 
areas, and maintain and operate all the works after 
completion in accordance with regulations prescribed 
by the Secretary of the Army. Formal assurances have 
not been requested. 
871

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscal year. Preliminary 
planning was continued at a cost of $150,783. 
Condition at the end of fiscal year. Preliminary planning 
is underway. 
33. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS. 
Annual inspections are made with local interests of 
all projects improved or extensively repaired at Federal 
expense in order to determine compliance of local 
interests with assurances given to the United State s 
regarding maintenance of the projects, to determine 
physical condition of the levees and appurtenances and 
to receive necessary information for use in flood 
emergencies. Inspection of 28 levees was made in the 
Chicago District involving approximately 177 miles of 
embankment. Fiscal year cost was $22,135. Total cost 
to June 30, 1970 was $245,953. (See table 29-0 on 
inspection of completed flood control projects.) 
34. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 29-P. 
35. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 
685, 80th Congress, as amended (preauthorization) 
None. 
Emergency flood control activities-repairf,l ood fighting and 
rescue work (Public Law 99, 84th Cong. and antecedent 
legislation) 
(See table 29-Q on emergency flood control activities-
repair.) 
Snagging and clearing of navigable streams and tributaries in 
interest of flood control (Sec. 208 of 1954 Flood Control Act, 
Public Law 780, 83rd Congress) 
None. 
GENERAL INVESTIGATIONS 
36. SURVEYS 
Fiscal year costs were $98,930 for navigation studies 
($32,210 by North Central Division) $65,797 for flood 
control studies, $9,711 for beach erosion study, $746, 
255 for special studies and comprehensive basin studies 
($700,631 by North Central Division), and $226 for 
coordination studies with Soil Conservation Service. 
37. COLLECTION AND STUDY OF BASIC 
DATA 
North Central Division fiscal year cost was $30,610 
for international water studies. 
Fiscal year costs were $145,731 for flood plain 
information studies, ($41,139 for North Central Division). 
Work was done on the following studies: 
Decatur, Ill., Green Bay, Wis., Little Calumet River, 
Ill. and Ind. (Brochure), Manitowoc County, Wis., 
North Branch of Chicago River, Ill., Wolf River, Wis., 
and Sheboygan, Wis. There was work on Technical 
and Flood Plain Management Services. (See table 29- 
R on Completed Flood Plain Studies.) 
38. RESEARCH AND DEVELOPMENT 
Cost for hydrologic studies during the fiscal year was 
$6,206. 
872

CHICAGO, ILL., DISTRICT 
TABLE 29-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
1. Burns Waterway 
Harbor, Ind. 
[Federal Funds] 
[Contributed 
Funds] 
2. Calumet Harbor 
and River, Ill. 
and Ind. 
[Federal Funds] 
[Contributed 
Funds] 
3. Cedar River 
Harbor, Mich. 
4. Chicago Harbor, 
Ill. 
5. Chicago River, 
Ill. 
6. Fox River, 
Wis. 
7. Green Bay 
Harbor, Wisc. 
8. Illinois Waterway, 
Ill. & Ind. 
Funding 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
Maint.: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
$ 55,000 
31,494 
4,000 
15,990 
-178,000 
83,209 
552,600 
41,545 
40,000 
20,691 
670,226 
-6,000 
1,767 
-5,400 
55,043 
303,282 
447,300 
461,808 
1,250,000 
1,415,070 
85,000 
140,810 
3,873,000 
3,618,259 
3,142,900 
3,107,779 
$ 25,000 $8,000,000 $5,520,000 
42,116 11,606 11,979,030 
- - -3,010 
-181,500 
355,896 
335,900 
765,681 
18,000 
19,804 
205,500 
1,990 
-19,895 
25,395 
24,538 
340,300 
414,331 
825,000 
761,153 
25,500 
220,979 
2,177,000 
2,706,218 
2,994,300 
3,010,414 
-65,000 
-11,540 
467,500 
540,618 
7,897 
228,848 
78,000 
83,105 
493,000 
454,886 
97,000 
153,588 
88,000 
96,614 
4,518,000 
3,832,615 
3,201,200 
3,540,549 
-470,000 
3,594 
501,435 
546,069 
150,000 
122,961 
222 
-46,522 
277 
277 
64,128 
15,891 
470,943 
526,198 
1,000,000 
919,604 
69,290 
68,953 
1,340,000 
3,958,430 
3,583,010 
3,368,488 
$13,600,000 
12,064,246 
15,990 
15,990 
22,109,8091 
22,075,607 
8,664,9072 
8,625,9122 
689,001 
689,001 
770,0003 
742,961. 
58,000 
48,614 
4,788,8274 
4,788,8274 
3,768,277 
3,768,277 
1,326,600 
1,326,600 
1,500,5655 
1,500,5655 
3,203,8166 
3,153,7036 
3,753,3347 
3,753,3347 
15,247,0738 
15,233,8618 
5,759,2959,11 
5,511,3829,11 
2,750,91310 
2,750,33010 
106,676,61612 
106,152,852 
63,269,96313 
62,725,56313 
414,625 
414,625 
873

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 29-A (Cont'd) 
See 
Section 
in Text Project 
9. Indiana Harbor, 
Ind. 
10. Kenosha Harbor, 
Wis. 
11. Kewaunee Harbor, 
Wis. 
12. Manitowoc Harbor, 
Wis. 
13. Menominee 
Harbor & River 
Mich. & Wis. 
[Contributed 
Funds] 
14. Michigan City 
Harbor, Ind. 
[Federal Funds] 
[Contributed 
Funds] 
COST AND FINANCIAL STATEMENT 
Funding 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
FY67
4,216 
231,000 
265,937 
-35,000 
286 
20,000 
40,955 
500,000 
14 
-17,400
45 
16,000 
25,245 
160,729 
645 
-5,000 
15,765 
7,000 
4,005 
2,210 
5,477 
30,000 
6,707 
99,000 
126,483 
450,000 
36 
28,600 
FY68 
$-4,200 
459 
-182,000 
-60,566 
6,666 
9,000 
10,815 
60,000 
473,968 
50,000 
79,215 
-32,700 
15,893 
30,660 
15,219 
59,000 
106,946 
35,330 
2,056 
12,500 
7,759 
4,210 
30,167 
73,000 
64,375 
280,000 
403,792 
2,200 
29,677 
FY69 
100,500 
145,857 
20,284 
49,000 
55,296 
330,000 
314,469 
35,000 
33,570 
9,300 
11,000 
12,316 
11,000 
34,499 
20,000 
20,461 
42,000 
36,624 
-3,338 
-835 
55,000 
48,412 
456,000 
496,518 
1,123 
FY70 
77,066 
77,643 
40,182 
43,118 
150,000 
186,119 
69,983 
69,565 
2,434 
70,000 
70,957 
-11,616 
-138 
4,280 
-5,238 
138 
75,496 
70,021 
143,685 
Total to 
June 30, 1970 
$4,897,14814,16 
4,897,14814,16 
4,059,87815 
4,035,01015 
846,9 6917,19 
846,96917,19 
1,050,17718 
1,049,91018 
1,040,000 
974,588 
752,33320 
752,333 
1,323,24121 
1,320,393 
617,300 
617,300 
881,53822 
877,71922 
1,563,72523 
1,563,725 
533,47624 
533,47624 
1,115,31625 
1,115,31625 
1,351,852 
1,351,852 
36,762 
36,762 
1,543,64626 
1,543,646 
2,427,738 
2,407,050 
1,186,000 
1,044,031 
30,800 
30,800 
874

TABLE 29-A (Cont'd) 
CHICAGO, ILL., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
15. Milwaukee Harbor, 
Wis. 
16. New Buffalo 
Harbor, Mich. 
[Federal Funds] 
[Contributed 
Funds] 
17. Oconto Harbor, 
Wis. 
18. Port Washington 
Harbor, Wis. 
19. Racine Harbor, 
Wis. 
20. Sheboygan Harbor, 
Wis. 
21. Sturgeon Bay 
& Lake Michigan 
Ship Canal, 
Wis. 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Apprqp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
$75,000 
479,184 
46,268 
129,733 
7,264 
485,000 
36,237 
684,000 
4,432 
4,432 
20,000 
4,104 
45,000 
63,931 
22,000 
20,000 
10,000 
38,555 
-4,000 
2,491 
$-59,900 
14,539 
39,000 
54,487 
87,081 
4,991 
1,588 
1,588 
10,000 
27,836 
56,000 
47,612 
45,000 
87,448 
50,000 
69,136 
3- 
267,800 125,415 
210,181 183,226 
- -550,000 
5,396 10,274 
15,000 
9,717 
-3,000 
3,089 
10,500 
17,697 
87,000 
66,866 
66,000 
66,985 
25,366 
12,314 
20,021 
18,036 
45,476 
35,135 
100,000 
60,126 
83,433 
100,177 
101,866 
875 
$8,231,02427 
8,231,024 
5,123,98728 
5,119,403 
1,931,900 
1,891,810 
225,000 
198,984 
684,000 
130,75429 
130,75429 
179,34430 
161,00930 
999,20431 
999,20431 
415,66832 
410,77232 
1,205,01533 
1,205,015 
1,213,4473 
1,201,897 
100,000 
1,136,08835 
1,136,08835 
1,443,59236 
1,440,71036 
609,028 
609,028 
1,059,72237 
1,059,722 
3,625,72538 
3,625,35438 
884,899 
884,899

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 29-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
22. Two Rivers New Work: 
Harbor, Wis. Approp. $ - $ - $ - $ - $ 360,32039 
Cost - - - - 360,32039 
Maint.: 
Approp. 10,000 59,500 78,000 9,187 1,656,81240 
Cost 68,281 73,353 76,009 4,155 1,647,28040 
Rehab.: 
Approp. - - - - 58,057 
Cost - - - - 58,057 
23. Waukegan New Work: 
Harbor, Ill. Approp. -54,700 - - - 823,02641 
Cost 751 - - - 823,02641 
Maint.: 
Approp. 43,000 5,000 78,500 50,231 1,979,81042 
Cost 33,751 11,479 73,310 24,534 1,943,47842 
27. Evanston, Ill. New Work: 
Approp. - 220,000 - -13,215 474,052 
Cost - 4,592 202,193 - 474,052 
29. Farm Creek, New Work: 
Ill. Approp. - - - - 9,859,02043 
Cost 2,726 - - - 9,859,02043 
Maint.: 
Approp. 29,700 29,700 29,700 29,891 442,621 
Cost 33,243 33,075 24,992 26,736 434,233 
30. Mouth of New Work: 
Sangamon River, Approp. 4,000 2,000 1,500 - 781,990 
Ill. Cost 954 5,500 1,288 - 781,758 
Maint.: 
Approp. 21,800 21,800 21,800 20,120 338,998 
Cost 17,796 27,600 20,277 23,655 337,144 
31. Oakley Lake New Work: 
& Channel Approp. 240,000 510,000 1,000,000 300,000 2,964,710 
Improvement, Cost 249,010 212,901 299,023 224,936 1,857,618 
Ill. 
32. Peoria, Ill. New Work: 
Approp. 75,000 125,000 291,000 50,000 541,000 
Cost 16,481 122,929 94,035 150,783 384,228 
1. Includes $855,973 for new work and $45,230 for 
previous projects. 
2. Excludes $620,000 in contributed funds in settlement 
pursuant to decree [No. 54-C-1608] regarding removal of 
flue-dust. 
3. In settlement, pursuant to decree [No. 54-C-1608] 
regarding removal of flue-dust. 
4. Includes $446,005 for previous projects. 
5. Includes $955,886 for previous projects. 
6. Includes $109,463 for previous projects. 
7. Includes $3,239,910 for previous projects. 
8. Includes $89,309 for previous projects. 
9. Includes $396,974 for previous projects. 
10. Includes $8,918 for previous projects. 
11. Excludes $100,000 contributed funds. 
12. Includes $2,569,102 for previous projects. 
13. Includes $1,028,468 for previous projects. 
14. Includes $60,668 for previous projects. 
15. Includes $2,509 for previous projects. 
16. Excludes $12,500 contributed funds. 
17. Includes $453,839 for previous projects. 
18. Includes $21,818 for previous projects. 
19. Excludes $3,000 contributed funds. 
20. Includes $149,312 for previous projects. 
21. 
22. 
23. 
24. 
25. 
26. 
27. 
28. 
29. 
30. 
31. 
32. 
33. 
34. 
35. 
36. 
37. 
38. 
39. 
40. 
41. 
42. 
43. 
44. 
Includes $88,364 for previous projects. 
Includes $400,126 for previous projects. 
Includes $54,288 for previous projects. 
Includes $312,423 for previous projects. 
Includes $36,194 for previous projects. 
Includes $287,389 for previous projects. 
Includes $1,293,220 for previous projects. 
Includes $459,305 for previous projects. 
Includes $84,569 for previous projects. 
Includes $8,161 for previous projects. 
Includes $188,495 for previous projects. 
Includes $15,123 for previous projects. 
Includes $427,240 for previous projects. 
Includes $79,537 for previous projects. 
Includes $487,817 for previous projects. 
Includes $87,131 for previous projects. 
Includes $323,419 for previous projects. 
Includes $219,730 for previous projects. 
Includes $212,857 for previous projects. 
Includes $33,113 for previous projects. 
Includes $218,233 on previous projects. 
Includes $15,711 on previous projects. 
Excludes $161,813 contributed funds. 
Excludes $15,122 contributed funds. 
876

CHICAGO, ILL., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
CALUMET HARBOR AND RIVER, ILL. AND IND. 
[See Section 2 of Text] 
Mar. 3, 1899 
June 13, 1902 
Mar. 3,1905 
June 25, 1910 
Sept. 22, 1922 
Aug. 30, 19351,2 
Aug. 30, 19351,2 
Mar. 2, 19453 
July 14, 1960 
Oct. 23, 1962 
Oct. 27, 1965 
Aug. 2, 1882 
Oct. 28, 1965 
July 11, 1870 
June 14, 1880 
Mar. 3, 1899 
July 25, 1912 
Mar. 2, 1919 
Mar. 3, 1931 
Outer harbor protected by breakwater 
Five turning basins 
Provided for shape and dimensions of 
turning basins 
Consolidated the 2 projects for Calumet 
Harbor and Calumet River 
Detached breakwater, dredging outer harbor to existing project 
depth and dimensions; deepen river-entrance channel and 
river to existing project depths; widen and straighten river 
channel; 5 turning basins to same depth as adjacent channel. 
Dredging areas A and B in south end of Lake Calumet and an 
entrance channel 300 feet wide to 21 feet deep. 
An approach channel to harbor 3,200 feet wide and 28 feet 
deep through shoals outside breakwater and closing 
existing gap between breakwaters. 
Depth of 29 feet in lake approach 28 feet in outer harbor; 
and 27 feet in river entrance up to EJ.&E. Ry. Bridge. 
Deepen, widen, and straighten channel in Calumet River from 
EJ.&E. Ry. Bridge to and including turning basin 5, to a 
depth of 27 feet in earth and 28 feet in rock; deepen 
turning basins 1, 3 and 5 to 27 feet; enlarge turning basins 
3 and 5; a channel into Lake Calumet to 27 feet deep for 
3,000 feet and a width of 1,000 feet; and eliminate turning 
basins 2 and 4 from project. 
Modification of Act of Oct. 23, 1962. Protection for Elgin, 
Joliet and Eastern Railway Bridge over the CalumetsRiver, 
to permit dredging to full width of the south draw to depth 
of 27 feet, and temporary protection for the center pier 
and south abutment of the New York, Chicago and St. Louis 
Railroad Bridge [Nickel Plate] to permit dredging of full 
width of south bridge draw to depth of 27 feet prior to its 
replacement. 
CEDAR RIVER HARBOR, MICH. [See Section 3 of Text] 
Dredge an entrance channel [datum at 580.69 feet above mean 
tide at New York] and construct two parallel piers 
extending lakeward from mouth of Cedar River. 
Modification of project to provide for two parallel entrance 
piers including a new rubble-mound east pier with a sport 
fishing walkway; an entrance channel from Green Bay to 
mouth of Cedar River; and a turning basin. 
CHICAGO HARBOR, ILL. [See Section 4 of Text] 
Inner breakwaters and inner basin. 
Exterior breakwater 
Present project depth in basin, and entrance to Chicago 
River. 
Shore-arm and southerly extension of exterior breakwater. 
Modification of area to be dredged in inner basin. 
Shore-arm extension of exterior breakwater transferred to 
Lincoln Park Commissioners. 
Annual Report, 1896 pp. 
2584 et seq., and H. Doc. 
277, H. 54th Cong., 1st sess. 
H. Doc. 172, 58th Cong., 2d. 
sess. 
H. Doc. 349, 60th Cong., 1st 
sess. 
H. Doc. 494, 72d Cong., 2d 
sess. 
H. Doc. 180, 73d Cong., 2d 
sess. 
H. Doc. 233, 76th Cong., I1st 
sess. 
H. Doc. 149, 86th Cong. 1st 
sess. 
H. Doc. 581, 87th Cong., 2d 
sess. 
H. Report No. 973, 89th Cong., 
1st sess. 
S. Ex. Doc. 12, 47th Cong., 
1st sess. 
H. Doc. 248, 89th Cong., 1st 
sess. 
A. Ex. Doc. 114, 41st Cong. 2d 
sess., and Annual Report 1879, 
pp. 1562-15674 
Annual Report 1870, pp. 
1562-15674 
Annual Report, 1897, 
pp. 2790-27914 
H. Doc. 710, 62d Cong. 2d sess. 4 
H. Doc. 1303, 64th Cong., 1st 
sess. 4 
Public 797, 71st Cong.4 
877 
451-584 0-72-56 
TABLE 29-B

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 29-B (Cont'd) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
Mar. 2, 1945 
Oct. 23, 1962 
Mar. 3, 1899 
June 13, 1902 
Mar. 2, 1907 
Mar. 2, 1919 
July 24, 1946 
Aug. 5, 1886 " 
Sept. 19, 1890 
June 3, 1896 
June 3, 1896 
June 3, 1902 
Mar. 2, 1907 
Mar. 3, 19258 
June 26, 19349 
July 3, 195811 
June 23, 1866 
July 13, 1892 
June 26, 1910 
Aug. 8, 1917 
Mar. 3, 1925 
Aug. 30, 193514 
Aug. 26, 1937 
Mar. 2, 1945 
Resumption of jurisdiction over shore-arm extension 
breakwater and over certain navigable waters in Lake 
Michigan which lie in northwestern part of outer harbor. 
Deepen a lake approach channel to 29 by 800 feet wide for 
6,600 feet; and deepen a channel and maneuver area inside 
harbor entrance to 28 by 1,300 feet wide. 
CHICAGO RIVER, ILL. [See Section 5 of Text] 
For project depth of 21 feet in lieu of that fixed by act of 
June 3, 1896. 
Turning basins. 
Idterpreted by Chief of Engineers, April 11, 1908 as 
adopting new work of the then existing project for 
21-foot depth. 
Eliminated all work, except maintenance of main river. 
Dredging channel 9 feet deep to within 30 feet of existing 
bulkheads and river banks from North Ave. to Belmont 
Ave., thence 9 feet deep and 50 feet wide to Addison St. 
FOX RIVER, WIS. [See Section 6 of Text] 
Improvement of Fox River. 
Dredging Fond du Lac Harbor on Lake Winnebago. 
Improvement of Wolf River 
Improvement of Stockbridge, of Calumet 
and Miller Bay, and of Brothertown 
Harbor, on Lake Winnebago. 
Increased depth in rock cuts on lower river, widen Neenah 
Channel, and a concrete retaining wall at Kaukauna. 
Operation and care of locks and dams provided for with funds 
from War Department appropriations for rivers and harbors. 
Sec. 108. That Federal project structure, appurtenances, and 
real property of Upper Fox River, Wis., be disposed of to 
State of Wisconsin. 
GREEN BAY HARBOR, WIS. [See Section 7 of Text] 
Outer Channel and revetment at Grassy Island 12 
Inner channel. 12 
Turning basin at DePere. 
Maintenance of turning basin at DePere. 
Increasing depth of inner channel and turning basin to 18. 
Deepen outer channel to 22 feet with widening and 
straightening inside of Tail Point Bend, widen channel in 
Fox River through city of Green Bay to 22 feet. 
Turning basin above Chicago & North Western Ry. Bridge. 
Turning basin at mouth of East River. 
Public 14, 79th Cong.4 
H. Doc. 485, 87th Cong., 2d sess. 4 
Specified in act. 5 
Specified in act.5 
H. Doc. 95, 56th Cong., 1st sess. 
[Annual Report, 1900, p. 3863, 
and Annual Report, 1909, 
p. 7091 s 
H. Doc. 1294, 64th Cong., 
1st sess. 5 
H. Doc. 767, 78th Cong., 2nd 
sess. 5 ,6 
Annual Report, 1885, pp. 
2041-2045 [plan of a board 
approach Dec. 10, 1884, as 
modified by Corps of Engineers, 
May 14, 18861. 
H. Ex. Doc. 24, 51st Cong., 
1st sess. Annual Report, 1890, 
p. 239010 
No prior survey or estimates1 0 
No prior survey or estimates1 0 
No prior survey or estimates1 0 
H. Doc. 294, 68th Cong., 1st 
sess. 
1 0 
S. Doc. 3910, 85th Cong. 
2d sess. l o 
Annual Report, 1867, p. 70. 
Unpublished report approved 
Aug. 3, 1892. 
H. Doc. 222, 61st Cong., 2d sess. 
H. Doc. 1017, 64th Cong., 
1st sess. 
H. Doc. 294, 68th Cong., 
1st sess. 1 3 
Rivers and Harbors Committee 
Doc. 40, 72d Cong., 2d sess. 
Rivers and Harbors Committee 
Doc. 73, 74th Cong., 2d sess. 13 
H. Doc. 95, 76th Cong., 
1st sess. 
878 
Documents

CHICAGO, ILL., DISTRICT 
TABLE 29-B (Cont'd) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
Oct. 23, 1962 
Jan. 21, 1927 
July 3, 1920 
June 26, 193415 
Aug. 30, 1935 
Aug. 30, 193516 
June 14, 1937 
June 20, 1938 
Oct. 23, 1943 
Mar. 2, 1945 
July 24, 1946 
Deepen and widen 9 miles of entrance channel to 26 by 500 
feet, respectively; 3.6 miles of entrance channel to 24 
by 300 feet; and 3.2 miles of existing Fox River to 24 
feet deep. 
ILLINOIS WATERWAY, ILL. AND IND. [See Section 8 of Text] 
Channel 9 feet deep and 200 feet wide from mouth of Illinois 
River to Utica, 231 miles, modification of 2 U.S. locks and 
dams, removal of 2 State dams. [Act authorized 
appropriation of not to exceed $3,500,000 for carrying 
on work.] 
Channel 9 feet deep from Utica, Ill., to 
heads of present Federal projects on Chicago and Calumet 
Rivers, 94.6 miles to Lake Street, and 96.3 miles to 
turning basin 5, respectively, to be secured by means of 
completed dams, locks, lateral canals, and dredging begun 
by State of Illinois in general accordance with present 
plans of state for that work. Act adopting project 
authorized appropriation of not to exceed $7,500,000 for 
carrying on work. 
Operation and care of locks and dams provided for with funds 
from War Department appropriations for rivers and harbors. 
Construct modern locks and dams at La Grange and Peoria and 
a channel 9 feet deep and 300 feet wide below Lockport, 
exact location and details of design of all structures to 
be left to discretion of Chief of Engineers, and, for time 
being, that no change be made in water authorized for 
navigation of Illinois River by act of July 3, 1930. 
Also provides for 3 passing places along Sag Channel and 
authorized channel in Calumet-Sag route to turning basin 5, 
and dredging at entrance of Lake Calumet. 
Realign portion of Calumet River and abandonment of 
bypassed section of Calumet River. 
Modifies local cooperation requirements in 1935 act. 
Pay damages to levee and drainage districts due to seepage 
and other factors, not to exceed $503,500. 
Enlarge Calumet-Sag Channel to 160 feet wide and a usable 
depth of 9 feet. Dredge a barge channel 160 feet wide 
with a usable depth of 9 feet in Grand Calumet and Little 
Calumet River Branch of Indiana Harbor Canal to deep 
[lake] draft through 141st St., East Chicago, Ind. 
Construct in Little Calumet River a lock of suitable 
dimensions for large navigation. Rebuild or otherwise 
alter at Federal expense all obstructive railroad bridges 
across Calumet-Sag channel. Little Calumet River, Calumet 
River, Grand Calumet River, and Indiana Harbor Canal, so as 
to provide suitable clearance, except that no Federal funds 
shall be expended for removal or alteration of Illinois 
Central R.R. bridge at mile 11.20 of Little Calumet River. 
Substitute following work for that authorized by act of 
Mar. 2, 1945; replace emergency dam in Chicago Sanitary and 
Ship Canal; enlargement of that canal thence to Sag Junction 
and of Calumet-Sag Channel to afford channels 225 feet wide 
with usable depth of 9 feet; construct along general route 
depth of 9 feet to 225 feet wide between Little Calumet 
River and junction with Indiana Harbor Canal and 160 feet 
wide thence to Clark St., Gary, Ind., with a turning basin 
at Clark St., enlarge Indiana Harbor Canal to 225 feet wide 
and usable depth of 9 feet between Grand Calumet River and 
vicinity of 141st St., inclusive; remove Blue Island lock 
and construct a lock and control works in Calumet River 
near its head, and similar structures in proposed Grand 
Calumet Channel west of Indiana Harbor Canal; alter or 
eliminate railroad bridges across three channels lakeward 
of Chicago Sanitary and Ship Canal, or construct new 
railroad bridges, to provide suitable clearance. 
879 
Documents 
H. Doc. 470, 87th Cong., 
2d sess. 13 
Rivers and Harbors Committee 
Doc. 4, 69th Cong., 1st sess., 
and S. Doc. 130, 69th Cong., 
1st sess. 
S. Doc. 126, 71st Cong., 
2d sess. 
H. Doc. 184, 73d Cong., 2d sess.1628 
H. Doc. 180, 73d Cong., 2d sess. 
Rivers and Harbors Committee 
Doc. 19, 75th Cong., 1st sess. 
H. Doc. 711, 77th Cong., 
2d sess. 
H. Doc. 145, 76th Cong., 
1st sess. 
H. Doc. 477, 79th Cong., 
2d sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 29-B (Cont'd) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
July 24, 1946 
July 17, 1953 
July 3, 1958 
Oct. 23, 1962 
Aug. 18, 1968 
June 25, 1910 
Mar. 4, 1913 
Mar. 2, 1919 
Mar. 20, 1922 
Mar. 3, 1925 
July 3, 193018 
June 30, 1932 
Aug. 30, 193517 
Aug. 26, 1937 
July 14, 1960 
Oct. 27, 1965 
Mar. 3, 1899 
Mar. 2, 1907 
A small-boat harbor in vicinity of Peoria, Ill., by 
construction of a basin 510 by 250 feet, dredged to 7 feet 
deep. 
$48,933 to reimburse Nutwood Drainage and Levee District for 
additional pumping operations; supplementing $58,750 
authorized in Oct. 1943 act. 
Federal participation in alteration of highway bridges, 
Calumet-Sag modification part 1 which constitute 
unreasonable obstructions to navigation, in accordance 
with Public Law 647, 76th Cong., as amended. 
Construct auxiliary locks at Lockport, Brandon Road, 
Dresden Island, Marseilles Starved Rock, Peoria, and 
La Grange. 
Federal participation in alteration of highway bridges, 
Calumet-Sag Modification, Part II, which constitutes 
unreasonable obstructions to navigation, in accordance 
with Public Law 647, 76th Congress, as amended. 
INDIANA HARBOR, IND. [See Section 9 of Text] 
Outer harbor and maintenance of inner harbor channel. 
Breakwaters. 
Lighthouse crib, present length and aline easterly and 
northerly breakwaters. 
Modify length of channel to be maintained in extension to 
Lake George. 
Authorized Secretary of War to modify project so far as 
relates to length and alinement of breakwaters and to sell 
Youngstown Sheet and Tube Co. about 1,180 linear feet of 
shoreward end of existing north breakwater. 
Existing project channel width and depth in Lake George 
Branch turning basin at the Forks. 
Authorized Secretary of War to sell Inland Steel Co. about 
1,903 linear feet of southerly end of existing east 
breakwater. 
Extend easterly breakwater, dredge entrance channel and outer 
harbor, deepen channel between bulkhead fills, widen main 
stem of canal and portion of Calumet River Branch to 
141st St. 
Modified conditions of local operation required before 
enlargement of Indiana Harbor Canal is undertaken 
by United States. 
Increase authorized depths to 29 feet in outer harbor 
entrance channel; 28 feet in outer harbor, and 27 feet in 
canal entrance channel to first EJ.&E. Ry. Bridge. 
Deepen main canal from landward end of canal entrance channel 
to a point lakeward of Dickey Place Bridge over a modified 
channel width of 190 feet, except through bridge 
openings. 
KENOSHA HARBOR, WIS. [See Section 10 of Text] 
Parallel piers and 600 feet of breakwater.12 
Extending breakwater 200 feet. 
H. Doc. 698, 79th Cong., 
2d sess. 
H. Doc. 144, 82d Cong., 
1st sess. 
H. Doc. 45 84th Cong., 
1st sess.2 9 
H.EDoc. 31, 86th Cong., 
1st sess. 
Specified in Act. Also 
H. Doc. 45, 85th Cong., 
1st sess. 
H. Doc. 1113 60th Cong., 
2d sess. 
H. Doc. 690, 62d Cong., 
2d seas. 
Rivers and Harbors Committee 
Doc. 6, 65th Cong., 2d sess. 
Public Law 176, 67th Cong. 
Rivers and Harbors Committee 
Doc. 21, 71st Cong., 2d sess. 
Public Law 219, 72d Cong. 
Rivers and Harbors Committee 
Doc. 29, 72d Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 13, 75th Cong., 1st sess. 
H. Doc. 195, 86th Cong., 
ist sess. 
H. Doc. 227, 89th Cong., 
1st sess. 1 3 
H. Doc. 328, 54th Cong., 
2d sess. Annual Report, 
1897, p. 2772, H. Doc. 164, 
55th Cong. 3d sess. Annual 
Report, 1899, p. 1817. 
H. Doc. 62, 59th Cong., 2d sess. 
and Rivers and Harbors 
Committee doc. 3, 59th Cong., 
2d sess. 
880 
Documents

TABLE 29-B (Cont'd) 
CHICAGO, ILL., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 30, 193519 Present project dimensions of entrance channel and basin. Rivers and Harbors Committee 
May 17, 1950 
Oct. 23, 1962 
Mar. 3, 1881 
June 25, 1910 
Aug. 30, 193520 
July 14, 1960 
Mar. 2, 1907 
Aug. 30, 193521 
Aug. 26, 1937 
Oct. 23, 1962 
Dec. 31, 1968 
Mar. 3, 1871 
June 13, 1902 
Mar. 4, 1913 
July 3, 1930 
Aug. 30, 1935 
Mar. 2, 1945 
July 14, 1960 
June 27, 1967 
Channel northwesterly from basin. 
Deepen lake approach channel to 27 and 800 feet wide; 
deepen approach channel to 26 feet entrance channel and 
inner basin to 25 feet. 
KEWAUNEE HARBOR, WIS. [See Section 11 of Text] 
Entrance piers.12 
Turning basin. 
North breakwater, remove old north pier, widen and deepen 
entrance channel and turning basin to 20 feet and remove 
outer south shoal. 
Enlarge existing turning basin, extend existing project into 
north basin, and increase depth of north basin to 20 feet 
at a maximum width of 500 feet and eliminate removal of 
outer shoal. 
MANITOWOC HARBOR, WIS. [See Section 12 of Text] 
Breakwaters. 
Present project dimensions of channel through outer basin 
removal of old north stub pier, and approach channel 
to a proposed city terminal south of shore end of south 
breakwater. 
Channel in river. 
Deepen lake approach to 25 feet by 800 feet wide, deepen 
outer harbor to 25 feet, river channel to 23 feet to 
8th St., and Upper River Channel to 22 feet to Soo Line 
R.R. 
Dredge River Channel to 12 feet from Soo Line R.R., 
720 feet upstream. 
Doc. 19, 74th Cong., 1st sess. 
H. Doc. 750, 80th Cong., 
2d sess. 
H. Doc. 496, 87th Cong., 
2d sess. 13 
Annual Report, 1881, p. 2082. 
H. Doc. 324, 60th Cong., 
1st sess. 
Rivers and Harbors Committee 
Doc. 43, 72d Cong., 1st sess. 
S. Doc. 19, 86th Cong., 1st sess. 1 3 
H. Doc. 62, 59th Cong., 1st 
sess., as modified by 
Rivers and Harbors Committee 
Doc. 3, 59th Cong., 
2d sess. 
Rivers and Harbors Committee 
Doc. 39, 73d Cong., 2d sess. 
Rivers and Harbor Committee 
Doc. 80, 74th Cong., 
2d sess. 
H. Doc. 479, 87th Cong., 
2d sess. 13 
Sec. 107, 1960 Rivers and 
Harbors Act, 
MENOMINEE HARBOR AND RIVER, MICH. AND WIS. [See Section 13 of Text] 
Entrance piers. 12 Annual Report, 1867, p. 132. 
Consolidation of project for harbor and river, and a channel H. Doc. 419, 56th Cong., 
18 feet deep. 1st sess. 
Partial restoration of work above bridge which had been 
eliminated by act of May 3, 1905. 
20-foot depth in channel and 18-foot depth in turning basin. 
21-foot depth in channel and turning basin and enlarge 
turning basin. 
Extend channel 12 feet deep to vicinity of Marinette Yacht 
Club. 
Deepen existing approach channel to 26 feet, entrance and 
river channels to 24 feet and enlarge turning basin. 
Deepen 1,100 feet of river channel generally north of 
Marinette Corp. facilities to 19 feet. 
MICHIGAN CITY HARBOR, IND. [See Section 14 of Text] 
East breakwater and old east pier including the outer basin. 
H. Doc. 171, 70th Cong., 
1st sess. 
Rivers and Harbors Committee 
Doc. 28, 73d Cong., 2d sess. 
H. Doc. 228, 76th Cong., 
1st sess. 
H. Doc. 112, 86th Cong., 
Ist sess. 1 3 
Sec. 107, 1960 River and Harbor 
Act. 
Recommendation of a Board of 
Engineers. Annual Report, 
1870, p. 123. 
881

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Acts Work Authorized 
Extension of east pier. 
Mar. 3, 1899 
Mar. 3, 1905 
Jan. 31, 1927 
Aug. 30, 1935 
Sept. 30, 1966 
Aug. 30, 1852 
Mar. 3, 1883 
Mar. 2, 1907 
Sept. 22, 1922 
Aug. 30, 1935 
Mar. 2, 1945 
July 14, 1960 
Oct. 23, 1962 
Aug. 2, 1882 
June 25, 1910 
July 11, 1870 
Aug. 14, 1876 
Aug. 30, 193523 
July 3, 195824 
Extend east pier and construct detached breakwater. 
Lower turning basin. Rebuild west pier as at present located. 
Present project dimensions of entrance channel. 
Existing project depth in channel, and in lower and 
middle turning basins, eliminated improvement of Trail 
Creek above middle turning basin and uncompleted 
portion of detached breakwater and old east pier 
inclosing outer basin. 
Restore and repair westerly 1,000 feet of east breakwater, 
dredging outer basin, and enlarging entrance to basin 
through east pier. 
Dredge river channel 50 feet wide and 6 feet deep from upper 
turning basin to E Street bridge. 
MILWAUKEE HARBOR, WIS. [See Section 15 of Text] 
North pier.12 
Inner 7,600 feet of north breakwater. 12 
South pier. Extending north breakwater 1,000 feet. 
Extend north breakwater; a south breakwater, present project 
dimensions of inner entrance channel. 
Dredging a portion of outer harbor to 21-foot depth. 
Dredging river channels to 21-foot depth. 
Deepen South Menomonee and Burnham Canals to 21 feet. 
Deepen an approach channel to 30 feet by 800 feet wide and 
300 feet wide through breakwater; deepen entrance channel 
28 feet through piers, outer harbor to 28 feet south of 
entrance channel, and a channel to 27 feet in Milwaukee 
River to Buffalo St., and in Kinnickinnic River to Chicago 
& North Western Ry. bridge 
OCONTO HARBOR, WIS. [See Section 17 of Text] 
Piers, except for inner 300 feet of south pier and 250 feet 
of north pier built by city. 
Present project dimensions of channel and turning basin. 
PORT WASHINGTON HARBOR, WIS. [See Section 18 of Text] 
North pier and south basin.12 
North basin. 
North breakwater, removal of 650 feet of north pier, outer 
turning basin, present project dimensions of channel 
and basin and extension of south breakwater. 
Extending and raising of north breakwater and placing 
rubble along sides; removing 456 feet of south breakwater 
and dredging in outer basin. 
Documents 
Reports of Boards of Engineers, 
Annual Report, 1851, pp. 2187 
2189; Annual Report, 1882, 
pp. 2264-2266. 
Annual Report, 1897, 
pp. 2903-2904. 
Joint resolution of Congress 
approved May 13, 1908, 
Public Law 23. 
H. Doc. 279, 69th Cong., 
1st sess. 
Rivers and Harbors Committee 
Doc. 34, 74th Cong., 
1st sess. 
Section 107, 1960 River and 
Harbor Act. 
S. Doc. 175, 25th Cong., 
2d sess. 
Annual Report, 1881, p. 22122. 
Annual Report, 1906, p. 1752. 
[No prior survey or estimate 
affecting breakwater 
extension.] 
H. Doc. 804, 66th Cong., 
2d sess. 
H. Doc. 289, 72d Cong., 
1st sess. 
S. Doc. 29 76th Cong., 
1st sess. 
H. Doc. 285, 86th Cong., 
2d sess. 
H. Doc. 134, 87th Cong., 
1st sess. 13 
Annual Report, 1881, p. 2066. 
H. Doc. 538, 61st Cong., 
2d sess. Plan C.13 
H. Ex. Doc. 28, 41st Cong., 
2d sess., and Annual Report, 
1879, p. 119. 
Annual Report, 1876, pt. 2, 
p. 379. 
H. Doc. 168, 72d Cong., 
1st sess., and River and 
Harbors Committee Doc. 41, 
74th Cong., Ist sess. 
H. Doc. 446, 83d Cong., 
2d sess. 13 
882 
TABLE 29-B (Cont'd)

CHICAGO, ILL., DISTRICT 
TABLE 29-B (Cont'd) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
RACINE HARBOR, WIS. [See Section 19 of Text] 
Breakwaters 
Remove shoals lakeward of harbor entrance, enlarge 
19-foot channel through outer basin and 19-foot channel in 
river. 
Present project dimensions of channel through outer basin 
and in river. 
SHEBOYGAN HARBOR, WIS. [See Section 20 of Text] 
North breakwater. 
Preserving south pier as part of project, providing turning 
basin, and elimination of proposed south breakwaters. 
Present project dimensions of channel. 
Widen and deepen outer harbor entrance channel to 450 feet, 
widen and deepen river channel from present project limit 
to north side of Jefferson Ave. 
STURGEON BAY AND LAKE MICHIGAN SHIP CANAL, WIS. 
[See Section 21 of Text] 
Breakwaters 1 2 
Acquisition of the canal. 
Canal revetments and consolidation of canal and harborworks. 
Present project dimensions of channels and elimination of 
turning basin immediately west of revetted canal. 
Turning basin between city and Bushman wharves. 
TWO RIVERS HARBOR, WIS. [See Section 22 of Text] 
South pier, 750 feet of north pier, and about 44 feet of 
north revetment.12 
Remainder of north pier and stilling basin. 
Deepening entrance channel and inner basin to 18 feet. 
Extend existing project in West Twin River to 18 feet deep 
and in East Twin River to 10 feet deep to 22d Street 
Bridge. 
WAUKEGAN HARBOR, ILL. [See Section 23 of Text] 
Parallel piers and basin.12 
Modified location of harbor entrance. 
Detached breakwater, extend piers, increase width of harbor 
at inner end of north pier, and dredge channel and basin to 
existing project depth. 
Extension of breakwater to shore, dredging near outer and 
of north pier, and enlarging inner basin. 
Mar. 2, 1907 
June 25, 1910 
Aug. 26, 1937 
Mar. 2, 1945 
883 
Documents 
H. Doc. 62, 59th Cong., 
1st sess., and Annual 
Report 1909, p. 1973 
Rivers and Harbors Committee 
Doc. 46, 75th Cong., 1st sess. 
H. Doc. 816, 77th Cong., 
2d and H. Doc. 1d55, 78th 
Cong., Ist sess. 
H. Doc. 62, 59th Cong., 1st 
sess. 
H. Doc. 475, 68th Cong., 
2d sess. 
Rivers and Harbors Committee 
Doc. 47, 74th Cong., 
1st sess. 
H. Doc. 554, 82d Cong., 
2d sess. 13 
H. Ex. Doc. 34, 42d Cong., 
2d sess. Annual Report, 
1872, p. 171. 
H. Ex. Doc. 106, 49th Cong., 
2d sess. 
H. Doc. 117, 56th Cong., 
2d sess. 
Rivers and Harbors Committee 
Doc. 9, 74th Cong., 1st sess. 
H. Doc. 421, 78th Cong., 
2d sess. 13 
Annual Report, 1871, p. 123 
[as modified by Chief of 
Engineers, Feb. 27, 1897]. 
H. Doc. 730, 59th Cong., 
1st sess. Modification of 
Plan A. 
Rivers and Harbors Committee 
Doc. 25, 73d Cong., 2d sess. 
H. Doc. 362, 84th Cong., 2d sess. 13 
Annual Report, 1880, p. 1942 
Annual Report, 1882, pp. 
277-2162. 
H. Doc. 343, 56th Cong., 
1st sess. 
Rivers and Harbors Committee 
Doc. 27, 71st Cong., 
2d sess. 
Mar. 2, 1907 
Jan. 21, 1927 
Aug. 30, 1935 
Sept. 3, 1954 
Mar. 3, 1873 
July 13, 1892 
June 13, 1902 
Aug. 30, 1935 
Mar. 2, 1945 
Mar. 3, 1871 
Mar. 2, 1907 
Aug. 30, 1935 
July 3, 1958 
June 14, 1880 
Aug. 3, 1882 
June 13, 1902 
July 3, 1930

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 29-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 2, 1945 Dredge an entrance channel to existing project dimensions H. Doc. 116, 77th Cong., 
from outer end of north pier to project depth in lake, 1st sess.2 5 
and dredge an anchorage area in southwest corner of inner 
basin to existing project depth. Abandonment of dredging 
triangular area in southwest corner of inner basin to 
18 feet deep. 
EVANSTON, ILL. [See Section 27 of Text] 
Sept. 3, 1954 Federal participation for beach erosion control at Clark H. Doc. 28, 83d Cong., 
St., Dempster St., and Lee St. Beaches and 4,130 feet 1st sess. 
of riprap protection along publicly owned shore, Evanston, 
Ill. 
Oct. 28, 1965 Modification of project to provide for Federal H. Doc. 159, 89th Cong., 
participation for beach erosion control at Grosse Point 1st sess. 1 3 
Park Beach and South Boulevard Beach, Evanston, Ill. 
1. Included in public works administration program Sept. 6, 
1943, and Dec. 16, 1933. 
2. Uncompleted portion is inactive [dredging in front of 
U.S. Steel Corp.] 
3. Uncompleted portion is inactive [breakwater closure.] 
4. Latest published map in in Annual Report for 1914, 
opposite p. 2924. 
5. Latest published map is in Annual Report for 1914, 
opposite p. 2928. 
6. Contains latest published map of North Branch above 
North Ave. 
7. $2,600,000 inactive. 
8. $286,000 inactive. 
9. Permanent Appropriations Repeal Act. 
10. Latest published maps are in H. Doc. 146, 67th Cong., 2d 
sess., and H. Doc. 294, 68th Cong., 1st sess. 
11. Transfer completed June 1962. 
12. Completed under previous projects. 
13. Contains latest published maps. 
14. Included in Public Works Administration program, Jan. 3, 
1934. 
15. Permanent Appropriations Repeal Act. 
16. Included, in part, in Public Works Administration 
program, Oct. 31, 1934, and Feb. 28, 1935. 
17. Included in public works administration program Sept. 6, 
1933, and July 25, 1934. Uncompleted portion is inactive 
[widen and deepen main channel of canal and Calumet River 
Branch.] 
18. Uncompleted portion is inactive [widen and deepen Lake 
George Branch.] 
19. Included in emergency relief program May 28, 1935. 
20. Included in emergency relief program, May 28, 1935. 
Inactive portion; removal of 200 linear feet of north pier, 
widening inner 200 feet of channel through outer basin, and 
closing gap in north-shore connection of breakwater. 
21. Superseded by act of October 23, 1962. 
22. Uncompleted portion inactive [dredging Milwaukee River 
from Buffalo St. Bridge to North Humboldt Ave. Bridge.] 
23. Work recommended in H. Doc. 168, 72d Cong., 1st Sess., 
included in Public Works Administration program, Sept. 6, 1933. 
24. Inactive. 
25. Contains latest published map. Anchorage area in 
southwest corner of inner basin is to be restudied. 
26. Contains latest published map of river. 
27. Contains latest published map of harbor. 
28. Contains latest pubh'shed map of Illinois and DesPlaines 
Rivers. 
29. Contains latest published maps of Calumet-Sag portion. 
884

CHICAGO, ILL., DISTRICT 
TABLE 29-C. EXISTING PROJECTS 
See 
Section 
in Text Project 
2. Calumet Harbor 
and River, Ill. and 
Ind. 
Chicago Harbor, Ill. 
Green Bay Harbor, 
Wis. 
Illinois Waterway, 
Ill. and Ind. 
---- ---- 
Project Dimensions 
Northerly breakwater 
Southerly breakwater 
North pier 
Approach channel 
Outer harbor 
River entrance 
Elgin, Joliet & Eastern Railway Bridge 
to turning basin No. 3 
Turning basin No. 3 to turning basin 
No. 5 
Approach into Lake Calumet 
Extension into Lake Calumet 
Turning basins 1, 2 and 5 
Shore arm north breakwater 
North exterior breakwater 
Southerly extension 
Main inner breakwater 
South inner breakwater 
North pier 
Approach channel 
Channel and maneuver area 
Entrance channel 
Inner basin 
Entrance channel 
Entrance channel 
Entrance channel 
Fox River channel 
Turning basin (on Fox River) at mouth 
of East River 
Turning basin above C.&N.W. Ry. Bridge 
Upper River channel 
Turning basin at DePere 
Nine locks and six dams with duplicate 
locks at seven locations 
Grafton to Lockport, Ill. 
Lockport to controlling works 
Controlling works to junction with 
Calumet-Sag Channel 
Calumet-Sag Channel to lock in Blue 
Island 
Calumet and Little Calumet Channel, 
from Blue Island to turning basin 5 
Grand Calumet River Channel from 
junction with Little Calumet River 
to and in Indiana Harbor Canal to 
141st, East Chicago, Ind. 
Also, Grand Calumet River Channel 
from junction of Indiana Harbor Canal 
and (;rand Calumet River to Clark St. 
in Gary, Ind., with a turning basin at 
Clark St. 
A channel in Chicago Sanitary and Ship 
Canal and South Branch Chicago River 
from Sag-Junction to Lake St. in Chicago, 
Ill. 
Length (feet) 
6,714 
5,007 
2,450 
8,000 
10,000 
4,000 
21,100 
8,000 
4,000 
3,000 
2,250 
5,413 
4,924 
4,338 
2,544 
960 
6,600 
2,200 
7,300 
1,270 
49,632 
9,504 
9,504 
16,896 
17,424 
291.1 miles 
2.0 miles 
10.0 miles 
16.0 miles 
7.7 miles 
9.0 miles 
4.2 miles 
22.1 miles 175-300 
885 
Width (feet) Depth (feet) 
3,200 
3,000 
290 
200 
and variable 
Variable 
400 
1,000 
800 
1,300 
190-470 
740 
500 
300 
300 
Varies 
1,000 
800 
150 
640 
300 
200-300 
225 
29 
28 
27 
27 
earth 
28 
rock 
27 
27 
27 
27 
29 
28 
21 
21 
26 
26 
24 
24 
24 
20 
18 
18
9
9
9 
225 9 
300 9 
225 9 
160 9

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 29-C (Cont'd) 
See 
Section 
in Text Project 
10. Kenosha 
Wis. 
11. 
12. 
EXISTING PROJECTS 
Project Dimensions 
Harbor, 
Kewaunee Harbor, 
Wis.l 
Manitowoc Harbor, 
Wis. 
Menominee Harbor 
and River, Mich. and 
Wis. 
13. 
14. Michigan City, Harbor, 
Ind. 
15. Milwaukee Harbor, 
Wisc. 
Breakwater 
North pier 
South pier 
Lake approach channel 
Approach channel 
Entrance channel 
Inner basin 
North Channel to 50th Street Bridge 
North breakwater 
North pier 
South pier 
Approach channel 
Outer basin 
Channel to turning basin 
Turning basin 
Channel to North Basin 
North Basin 
North breakwater 
South breakwater 
North stub pier 
Approach channel 
Outer harbor 
Lower River Channel 
Upper River Channel 
Upper River Extension 
North pier 
South pier 
Approach channel 
Inner channel 
River channel 
Turning basin 
River channel 
River channel 
Detached breakwater 
West pier 
East pier 
East breakwater 
Entrance channel 
Main channel 
Outer basin 
Trail Creek 
Trail Creek 
North breakwater 
South breakwater 
North pier 
South pier 
Approach channel 
886 
Length (feet) 
796 
1,077 
1,175 
2,800 
650 
2,150 
800 
475 
2,980 
650 
1,850 
800 
1,200 
950 
700 
1,000 
300 
2,540 
2,290 
74 
2,600 
1,700 
1,500 
7,000 
720 
1,870 
2,681 
3,000 
3,100 
4,800 
800-200 
1,100 
1,400 
1,304 
835 
2,276 
1,000 
1,900 
2,400 
900 
3,000 
2,300 
9,954 
9,671 
1,656 
1,608 
1,500 
Width (feet) 
- 
800 
400 
200 
200-700 
75 
600 
505 
150-156 
500 
100 
500 
800 
800 
180 
Variable 
110-150 
600 
300 
200 
500 
150 
90 
150-425 
120-150 
900 
50-100 
50 
200-800 
Depth (feet) 
27 
26 
25 
25 
21 
20 
20 
20 
20 
20 
20 
25 
23 
23 
22 
12 
26 
24 
24 
21 
19 
12 
18 
18 
8-12 
18
6 
30

CHICAGO, ILL., DISTRICT 
TABLE 29-C (Cont'd) EXISTING PROJECTS 
See 
Section 
in Text Project Project Dimensions Length (feet) Width (feet) Depth (feet) 
Milwaukee Harbor 
(Cont'd) 
Oconto Harbor, Wis. 
Port Washington 
Harbor, Wis. 
Racine Harbor, Wis. 
Sheboygan Harbor, 
Wis. 
Sturgeon Bay and 
Lake Michigan 
Ship Canal, Wis. 
Two Rivers Harbor, 
Wis. 
15. (cont'd) 
887 
Entrance channel 
North outer harbor 
South outer harbor 
Milwaukee River 
Milwaukee River to Buffalo Street 
Bridge 
Milwaukee River Buffalo St. to 
Humboldt Ave. 
Menomonee River 
Kinnickinnic River entrance channel 
to C&NW Ry. 
Kinnickinnic River C&NW Ry to 
So. Kinnickinnic Ave. Bridge 
South Menomonee Canal 
Burnham Canal 
North pier 
South pier 
Approach channel 
River channel 
Turning basin 
North breakwater 
North stub pier 
Entrance channel and outer basin 
North basin 
West basin 
North breakwater 
North stub pier 
South breakwater 
Approach channel 
Outer basin 
Root River Channel 
North breakwater 
North stub pier 
South breakwater 
Approach channel 
Entrance channel 
Outer turning basin 
Lower river channel 
Upper river channel 
Approach channel 
Two converging breakwaters (each) 
Approach through breakwaters 
Revetted canal 
Channel through Sturgeon Bay 
Channel through Sturgeon Bay 
Approach channel 
North pier 
South pier 
Channel 
17. 
18. 
19. 
4,300 
4,600 
4,600 
1,100 
2,750 
10,000 
9,000 
4,400 
2,200 
4,350 
1,320 
1,350 
2,200 
2,500 
1,300 
500 
3,817 
125 
2,550 
750 
490 
2,640 
180 
2,616 
680 
1,000 
2,900 
3,832 
120 
2,490 
1,000 
1,860 
1,500 
4,400 
1,300 
1,200 
1,344 
1,880 
6,400 
21,400 
14,600 
1,000 
1,642 
1,720 
1,600 
20. 
250-000 
1,500 
2,200 
250 
Vairable 
Variable 
Variable 
350-150 
150-100 
100 
100 
150-300 
100 
375 
100-750 
150-185 
100-130 
250 
1,000 
95-190 
450 
475 
400 
140-370 
100-130 
600 
130-200 
130 
250 
500 
500 
200 
28 
212 
28 
27 
21 
21 
21 
27 
21 
21 
21 
15 
15 
15 
21 
18 
18 
23 
21 
19 
25 
21 
20 
21 
15 
23 
23 
22 
22 
22 
18 
18 
21. 
22. 
i
i 
1

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 29-C (Cont'd) EXISTING PROJECTS 
See 
Section 
in Text Project Project Dimension Length (feet) Width (feet) Depth (feet) 
22. (Cont'd) Two Rivers Harbor, 
Wis. (Cont'd) Inner Basin 800 200 18 
Channel East Twin Bridge 2,200 100 10 
23. Waukegan Harbor, North breakwater 1,900 - - 
Il1. North pier 1,610 - - 
South pier 3,211 - - 
Entrance channel 1,200 390 22 
Channel to inner basin 1,700 200 18 
Inner basin 1,375 375-500 18 
For detailed description see page 1224, Annual Report for 1963. 
Dredging by city of Milwaukee and reimbursed at 104 per cu. yd. 
FOX RIVER, WIS. 
WATER FLUCTUATIONS 
TABLE 29-E. (See Section 6 of Text) 
Ordinary Fluctuations Extreme Fluctuations 
Above Mean Below Mean Above Mean Below Mean 
Place Stage (feet) Stage (feet) Stage (feet) Stage (feet). 
Lower Fox River at DePere Dam 1.0 1.4 2.5 4.0 
Lake Winnebago 1.2 1.3 2.2 3.7 
Wolf River at New London 5.0 2.6 8.8 3.0 
GREEN BAY HARBOR, WIS.: 
TOTAL COSTS TO JUNE 30, 1970 FOR EXISTING PROJECT 
TABLE 29-F. (See Section 7 of Text) 
Project Funds New Work 1 Maintenance Total 
Green Bay Harbor, Wis. Regular $4,173,608 $2,741,412 $6,915,020 
Public Works 940,800 - 940,800 
Total $5,114,408 2,741,412 $7,855,820 
1 Excludes $100,000 contributed funds. 
888

FOX RIVER, WIS.: LOCKS AND DAMS 
(See Section 6 of Text) 
Depth at 
Normal Pool 
Miles Avail- Lower 
from Dis- Clear able Breast Miter Character Kind Year 
Green tance Width Length Lift Wall' Sill of of Type of Corn- Actual 
Name of Lock and Dam Bay Nearest Town (miles) (feet) (feet) (feet) (feet) (feet) Foundation Dam Construction plete Cost 
DePere lock 
2 
7.1 DePere - 36.0 146.0 8.9 10.3 12.0 Rock - Concrete 1936 $229,308 
DePere dam
2 
Little Kaukauna lock
2 
Little Kaukauna dam
2 
Rapide Croche lock
2 
Rapide Croche Dam
2 
Kaukauna rifth lock
2 
Kaukauna fourth lock
2 
Kaukauna third lock
2 
Kaukauna second lock
2 
Kaukauna first lock
2 
Kaukauna Dam
2 
0 Kaukauna guard lock CO Little Chute combined lock: 
Lower 
Upper 
Little Chute second lock
2 
Little Chute first (guard) locks 
Little Chute Dam
2 
Cedars lock
2 
Cedars Dam
2 
Appleton fourth lock
2 
Appleton lower dam
2 
Appleton third lock
2 
Appleton second lock
2 
Appleton first lock 
2 
Appleton upper dam 
Menasha lock 
2 
Menasha Dam
2 
7.2 DePere - 
13.0 DePere 6 
13.1 DePere 6 
19.2 Wrightstown 2 
19.3 Wrightstown 2 
22.8 Kaukauna - 
23.1 Kaukauna - 
23.3 Kaukauna - 
23.4 Kaukauna - 
23.6 Kaukauna - 
24.0 Kaukauna - 
24.0 Kaukauna - 
24.4 Little Chute 1 
25.4 Little Chute 1 
26.4 Little Chute - 
26.5 Little Chute - 
26.6 Little Chute - 
27.3 Little Chute 1 
27.4 Little Chute 1 
30.7 Appleton 1 
30.9 Appleton 1 
31.3 Appleton - 
31.6 Appleton - 
31.9 Appleton - 
32.2 Appleton - 
37.0 Menasha - 
37.8 Menasha - 
36.0 146.0 
36.0 146.0 
36.0 146.0 
35.6 144.0 
36.6 144.1 
30.6 144.0 
35.0 144.0 
35.1 144.4 
40.0 
35.4 146.5 
36.3 144.1 
35.0 144.2 
35.4 - 
35.0 144.0 
35.0 144.0 
- - - Rock Fixed 4 Concrete 
7.2 8.0 9.5 Clay - Concrete 
- - - Clay and gravel Fixed 3 4 Piers and concrete 
8.3 8.8 9.3 Rock - Concrete 
- - - Rock Fixed 
3 
4 Concrete 
9.1 6.7 7.4 Rock - Composite 
10.2 6.9 6.0 Rock - Stone masonry 
10.2 6.9 6.3 Rock - Stone masonry 
9.6 6.0 6.0 Rock - Stone masonry 
11.0 6.9 6.0 Rock - Stone masonry 
- - - Rock Fixed 3 4 Concrete 
9.4 - Rock - Stone masonry 
10.9 
10.6 
13.8 
9.8 
7.6 
35.0 144.0 8.7 
35.1 144.6 9.6 
35.0 144.7 10.0 
35.4 144.0 8.5 
6.0 8.6 Rock 
7.6 6.0 Hardpan 
8.0 6.1 Rock 
6.6 - Rock 
- - Rock 
6.8 7.3 Rock 
- - Rock 
8.1 7.9 Rock 
- - Rock 
6.0 8.6 Rock 
6.9 6.0 Clay 
6.6 6.0 Rock 
- - Rock 
7.2 8.0 Clay 
- - Hardpan 
- Stone masonry 
- Stone masonry 
- Stone masonry 
- Stone masonry 
Fixed3 '4 Concrete 
- Stone masonry 
Fixed3,4 Concrete 
- Stone masonry 
Fixed3 4 Concrete 
- Stone masonry 
- Stone masonry 
- Stone masonry 
Fixed3 Concrete 
- Composite 
Fixed3 Concrete 
1929 209,536 
1938 362,427 
1926 179,398 
1934 228,738 
1930 118,975 
1898 13,310 
1879 37,536 C 
1879 39,948 - 
1903 24,313 
1883 38,704 
1931 123,763 
1891 12,630 
1879 102,304 
1879 - 
1881 48,555 
1904 7,8175 
1932 82,554 
1888 34,972 - 
1933 84,973 
1907 40,893 
1934 73,903 
1900 32,238 
1901 22,940 
1884 36,004 
1940 151,558 
1899 19,3265 
1937 84,686 
SDepth shown is on breast wall, which is controlling depth for upper pool. 
2
Original structure built prior to assumption of control by United States 
on Sept. 18, 1872. 
3Provided with sluices. 
4 Flash boards used. 
5 Partially rebuilt. 
TABLE 29-D.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
ILLINOIS WATERWAY: 
EXISTING AND PROPOSED LOCKS AND DAMS 
TABLE 29-G. (See Section 8 of Text) 
Depth on Miter Sills 
Dimensions at Low Water 
Available Lift at 
Miles Width of Length for Low 
Above Miles to Chamber Full Width Water1 Lower Upper 
Lock Mouth Nearest Town (feet) (feet) (feet) (feet) (feet) 
LaGrange lock ' 80.2 7.8 below Beardstown, Ill. 110 600 10.0 13.0 15.5 
Auxiliary lock 1 80.2 7.8 below Beardstown, Ill. 110 1,200 10.0 13.0 15.5 
Peoria lock / 157.7 4.1 below Peoria, Ill. 110 600 11.0 12.0 15.5 
Auxiliary lock 157.7 4.1 below Peroia, Ill. 110 1,200 11.0 14.0 14.0 
Starved Rock lock 231.0 Utica, Ill. 110 600 18.5 14.0 16.8 
Auxiliary lock ' 231.0 Utica, Ill. 110 1,200 18.5 14.0 13.0 
Marseilles lock/ 244.6 Marseilles, Ill. 110 600 24.45 14.0 18.0 
Auxiliary lock / 244.6 Marseilles, m. 110 1,200 24.25 14.0 12.75 
Dresden Island lock' 271.5 8 above Morris, Ill. 110 600 21.75 12.25 16.85 
Auxiliary lock f 271.5 8 above Morris, Ill. 110 1,200 21.75 14.0 13.0 
Brandon Road lock ' 286.0 Joliet, Ill. 110 600 34.0 13.8 17.85 
Auxiliary lock ' 286.0 Joliet, Ill. 110 1,200 34.0 14.0 14.0 
Lockport lock / 291.1 Lockport, 1. 110 600 30.5-39.52 15.0 11.5-22.02 
Auxiliary lock 1 291.1 Lockport, Ill. 110 1,200 30.5-39.52 14.0 14.6 
T,J. O'Brien lock / 326.5 Chicago, Ill. 110 1,000 - 14.0 14.0 
Grand Calumet lock3 329.5 Hammond, Ind. 110 1,000 - 14.0 14.0 
Lifts and depths on miter sills are those obtained with flat pools. 
2Variation in lift and depth on upper miter sill at Lockport is due to 
fluctuation of water surface in the sanitary district canal. 
3 Proposed. 
890

CHICAGO, ILL., DISTRICT 
ILLINOIS WATERWAY, ILL. AND IND. 
LOCK AND DAM CONSTRUCTION, FOUNDATIONS, COST 
(See Section 8 of Text) 
Estimated 
Lock Dam Federal Cost 
under 
Type of Character of Type of Character of Year Existing 
Name Construction Foundation Kind Construction Foundation Complete Project 
Illinois River, mouth to 
Utica; channel improvement 
by dredging in 
Illinois Rvier below 
Starved Rock, modification 
of two U.S. locks 
and dams, and removal 
of two State dams. 
LaGrange 
Auxiliary lock 
Peoria 
Auxiliary lock 
Starved Rock 
Auxiliary lock 
Marseilles 
Auxiliary lock 
Dresden Island 
Auxiliary lock 
Brandon Road 
Auxiliary lock 
Lockport lock 
Auxiliary lock 
TJ. O'Brien lock 
and dam 
Proposed lock in 
Grand Calumet 
River 
Concrete Piles in sand Movable 
(wicket 
with Aframe-
crest) 
Concrete Piles in sand 
S- - $ 2,773,4991 
Concrete and Piles in sand 1939 2,744,5921 
timber 
Concrete and Piles in sand 
timber 
Concrete Piles in sand Movable Concrete and Piles in sand 1939 
(wicket type) timber 
Concrete Piles in sand Concrete and Piles in sand 
timber 
Concrete Rock Movable Concrete and Rock 1933 
(tainter gates) structural steel 
Concrete Rock 
Concrete Rock 
Concrete Rock 
Concrete Rock 
Concrete Rock 
Concrete Rock 
Concrete Rock 
Concrete Rock 
Concrete 
Concrete 
and sheet 
piling 
Concrete 
and sheet 
piling 
Proposed replacement of Concrete 
of emergency dam and sheet 
piling 
Lock and dam 
Rock 
Movable Concrete and Rock 
(tainter gates) structural steel 
Rock 
Movable Concrete and Rock 
(tainter gates) structural steel 
Rock 
Movable Concrete and Rock 
(tainter gates) structural steel 
Rock 
Movable (Rear Concrete and Rock 
trap)2 structural steel 
Rock 
Piles in clay Fixed 3 
Piles in clay Fixed 3 
Piles in clay Movable 
(vertical 
type) 
25,815,000 
3,381,130' 
25,730,000 
885,3151 
29,010,000 
1933 1,853,725' 
36,260,000 
1933 2,503,3761 
1933 
1933 
Rock 
Concrete and Piles in clay 1960 
sheet piling 
Concrete and Piles in clay - 
sheet piling 
Structural steel Rock - 
30,690,000 
2,031,6831 
34,825,000 
133,6081 
43,670,000 
6,954,7001 
12,270,000 
2,000,000 
1,250,304' 
Total locks and dams - $264,781,832 
1 Actual cost 2 Six dams completed by the Corps; 48-foot bear trap at Lockport completed 
by State of Illinois. 
Control works. 
891 
TABEL 29-H.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
ILLINOIS WATERWAY, ILL. AND IND. 
ADDITIONAL FEATURES ENTERING INTO COST 
TABLE 29-I. (See Section 8 of Text) 
Dredging:
Little Calumet and Calumet Rivers 
Calumet-Sag, 3 passing places 
Starved Rock to Lockport 
Starved Rock to Grafton 
Chicago Sanitary and Ship Canal 
Calumet-Sag Channel 
Grand Calumet River and Indiana Harbor Canal 
Peoria small boat harbor 
Protection piers at all locks 
Calumet-Sag modification engineering and design 
Calumet-Sag modification, supervision and administration 
Rebuild highway bridges 
Rebuild railway bridges: 
Calumet-Sag Channel 
Little Calumet and Calumet Rivers 
Grand Calumet River and Indiana Harbor Canal 
Removal of Blue Island lock 
Grand Calumet River controlling works 
St. Louis District 
Total additional features 
Total existing project 
$ 2,135,3581 
813,4181 
5,162,890 
3,794,052 
22,830,000 
19,454,000 
10,620,000 
24,9371 
77,6131 
12,094,000 
11,607,000 
54,592,000 
21,045,520 
18,885,480 
40,070,000 
301,100 
106,200 
1,081,6001 
$224,665,168 
$489,447.000 
1 Actual cost. 
ILLINOIS WATERWAY, ILL. AND IND. 
THE TOTAL COST OF EXISTING PROJECT TO JUNE 30, 1970 
TABLE 29-J. (See Section 8 of Text) 
New Work Maintenance Rehabilitation Total 
Regular Funds $ 97,764,079 $61,697,095 $414,625 $159,875,799 
Public Works Funds 3,960,735 - - 3,960,735 
Emergency Relief Funds 1,858,936 - - 1,858,936 
Total $103,583,750 $61,697,095 $414,625 $165,695,4701 
1Includes $1,735,890 expended between 1927 and 1936 on the operation 
and care of the works of improvement under the provisions of the permanent 
indefinite appropriation for such purposes. 
892

CHICAGO, ILL., DISTRICT 
TABLE 29-K. 
KENOSHA HARBOR, WIS.: COSTS UNDER EXISTING PROJECT 
(See Section 10 of Text) 
New Work Maintenance Rehab. Total 
Regular Funds $365,472 $1,028,092 $974,588 $2,368,152 
Emergency Relief Funds 27,658 27,658 
Total $393,130 $1,028,092 $974,588 $2,395,810' 
1Excludes $3,000 contributed funds. 
RECONNAISSANCE AND CONDITION SURVEYS 
TABLE 29-L. (See Section 24 of Text) 
Date survey 
Name of Project conducted Cost 
Algoma Harbor, Wis. June 1970 $ 1,599 
Big Suamico, Wis. Feb. 1970 1,021 
Harbors at Washington Island, 
Wis. Aug. & Dec. 1969 10,014 
Little Bay De Noc, 
Gladstone Harbor & 
Kipling, Mich. Feb. 1970 150 
TABLE 29-M OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Algoma Harbor, Wis. 1964 $ 292,010 $ 325,132 
Big Suamico, Wis. 1966 20,243 80,071 
Harbors at Washington Island, Wis.1 1950 62,838 19,973 
Little Bay De Noc, Gladstone 
Harbor & Kipling, Mich. 1966 332,832 3,700 
Pensaukee Harbor, Wis. 1966 34,035 71,705 
South Milwaukee Harbor, Wis.2 , 3 1906 5,000 - 
1. Channels adequate for commerce. 
2. No commerce reported. 
3. Abandonment recommended in 1926 [H. Doc. 467, 69th 
Cong., 1st Sess.]. 
893 
451-584 0-72-57

TABLE 29-N 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Chicago, Cook County, 111.1 $ - $ - $ - 
Kenilworth, Cook County, I1.1 - 5,2003 - 
Lake Bluff, Lake County, Ill. - - 
Lake Forest, Lake County, 111.1 
Shore of Manitowoc County, Wis. 2 
- 60,5034 
Winnetka, Cook County, Il.1 
1. Authorized by River and Harbor Act of 1954. 4. Includes reimbursement of $56,037 to Wisconsin State 
2. Authorized by River and Harbor Act of 1958. Highway Commission and Government costs of $4,466, in fiscal 
3. Reimbursement to Kenilworth in fiscal year 1961. year 1964. 
INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
TABLE 29-0 (See Section 33 of Text) 
Project Location Date of Inspection 
ILLINOIS RIVER, ILLINOIS 
Banner Special Drainage and Levee District Nov. 1969 
Big Lake Drainage and Levee District Nov. 1969 
Coal Creek Drainage and Levee Distrcit Dec. 1.969 
Crane Creek Drainage and Levee District Nov. 1969 
East Liverpool Drainage and Levee District Feb. 1969 
East Peoria Drainage and Levee District Nov. 1969 
East Peoria Sanitary District Nov. 1969 
Hennepin Drainage and Levee District Nov. 1969 
Kelly Lake Drainage and Levee District Nov. 1969 
Kerton Valley Drainage and Levee District Nov. 1969 
Lacey Drainage and Levee District Nov. 1969 
Langellier Drainage and Levee District Nov. 1969 
Liverpool Drainage and Levee District Nov. 1969 
Lost Creek Drainage and Levee District Nov. 1969 
Pekin and LaMarsh Drainage and Levee District Nov. 1969 
Rocky Ford Drainage and Levee District Nov. 1969 
Sanitary District of Beardstown Nov. 1969 
Sea Horn Drainage and Levee District Nov. 1969 
South Beardstown Drainage and Levee District Nov. 1969 
Spring Lake Drainage and Levee District Nov. 1969 
Thompson Lake Drainage and Levee District Nov. 1969 
Valley Drainage and Levee District Nov. 1969 
West Matanzas Drainage and Levee District Nov. 1969 
SANGAMON RIVER, ILLINOIS 
Clear Lake Special Drainage District Nov. 1969 
Farmers Levee and Drainage District Nov. 1969 
Farmers Levee and Drainage District (Herget) Nov. 1969 
Mason and Menard Drainage District Nov. 1969 
Oakford Special Drainage District Nov. 1969 
894

CHICAGO, ILL., DISTRICT 
TABLE 29-P OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
ILLINOIS RIVER, ILL. 
Banner Special Drainage and Levee Districts 1943 274,822 
Big Lake Drainage and Levee District1 1943 144,910 
Big Prairie Drainage and Levee District-2 
Coal Creek Drainage and Levee District1 1954 1,923,145 
Crane Creek Drainage and Levee District1 1941 68,898 
East Liverpool Drainage and Levee District1 1941 207,826 
East Peoria Drainage and Levee District1 1946 279,963 
Hennepin Drainage and Levee District1 1940 109,593 
Kelly Lake Drainage and Levee District 1947 13,153 
Lacy Langellier, West Mantanzas and Kerton 1954 1,290,0003,6 
Valley Drainage and Levee District1 
Liverpool Drainage and Levee District1 1943 117,731 
Lost Creek Drainage and Levee District4 1938 
Pekin LaMarsh Drainage and Levee District1 1955 168,383 
Rocky Ford Drainage and Levee District1 1941 108,797 
Sea Horn Drainage and Levee District1 1945 32,281 
Sid Simpson Flood Control Project 1968 5,789,800 
South Beardstown and Valley Drainage and 1942 220,729 
Levee District1 
South Beardstown Drainage and Levee District1 1942 171,839 
Spring Lake Drainage and Levee District1 1941 185,980 
Thompson Lake Drainage and Levee District 1952 9,465 
KANKAKEE RIVER, ILL. AND IND. 
Levee between Shelby Bridge and Baum's 1938 
Bridge in Ind. 
LITTLE CALUMET RIVER, ILL. AND IND. 
Little Calumet River and Tributaries, 1968 53,136 
Ill. and Ind. 
SANGAMON RIVER, ILL. 
Bell Drainage District 1946 1,112 
Clear Lake Special Drainage District 1965 103,027 
East of Chandlerville 1959 30,588 
Farmers Levee and Drainage District1 1942 155,562 
Farmers Levee and Drainage District 5 
Mason and Menard Drainage District1 1940 93,808 
Near Springfield on Sangamon River, Ill. 1 1941 97,743 
Oakford Special Drainage District1 1940 38,417 
Panther Creek levee 1938 
Tar Creek levee 1946 1,425 
SALT CREEK, ILL. 
Donovan levee 1945 1,821 
East of Hubly Bridge 1945 572 
Lake Fork of Salt Creek 
Lussenhop levee 1945 110 
Salt Creek in vicinity of Middletown, Ill. 1940 48 
895

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 29-P (Cont'd) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Swiger Whitney, Young, Hobit levee 1945 $ 399 $ - 
Watts levee 1945 1,031 - 
1. Completed. 4. Reported previously by St. Louis District as completed 
2. Never activated, under provisions of section 6, Flood Control Act of 1928. 
3. Settlement of claim in Nov. 1958 [$4,250] increased cost 5. Authorized in Flood Control Act of 1962. 
to $1,290,000. 6. Includes $55,976 claims. 
EMERGENCY FLOOD CONTROL ACTIVITIES 
TABLE 29-Q. (See Section 35 of Text) 
Project and Location Federal Cost 
Advance preparation $36,641 
Rehabilitation 
Aherns Levee 2,191 
East Liverpool Levee 4,970 
COMPLETED FLOOD PLAIN STUDIES 
TABLE 29-R. (See Section 37 of Text) 
Location Requesting Agency Date Completed Federal Cost 
Little Calumet River and Northeastern Illinois June 1965 23,000 
Tributaries, Ill. and Ind. Metropolitan Area 
Planning Commission 
and Indiana Flood 
Control and Water 
Resources Commission 
Des Plaines River, Ill. and Wis. Northeastern Illinois March 1966 24,700 
Metropolitan Area 
Planning Commission 
and Southeastern 
Wisconsin Regional 
Planning Commission 
Little Calumet River, Indiana Department August 1969 8,600 
Illinois and Indiana of Resources 
(Brochure) 
Wolf River, Wis. Northeastern Wisconsin Sept. 1969 40,600 
(Lake Poygan to Shawano) Regional Planning 
Commission 
Manitowoc County, Wis. Manitowoc County June 1970 89,300 
(East Twin River, West Planning and Park 
Twin River, Manitowoc Commission 
River, Little Manitowoc 
River and Silver Creek) 
896

DETROIT, MICH., DISTRICT* 
This district comprises lower peninsula and eastern 
half of upper peninsula of Michigan except a small 
area in southwestern corner of lower peninsula; 
northwestern Ohio; and a small part of northern 
Indiana. It embraces Michigan waters of Lake 
Michigan ; U. S. waters of eastern Lake Superior, Lake 
Huron, Lake St. Clair, and western Lake Erie; and 
their tributary watersheds from Au Train Bay, 
exclusive, in Lake Superior, Peninsular Point, and St. 
Joseph River in Lake Michigan, to Sandusky Bay on 
Lake Erie, exclusive. Unless otherwise indicated, all 
depths stated in this report are referred to low water 
datum as follows: Lake Superior, 600 feet; Lake 
Michigan-Huron, 576.8 feet; Lake Erie, 568.6 feet; 
and Lake St. Clair, 571.7 feet. Elevations in feet are 
above mean water level at Father Point, Quebec 
(International Great Lakes Datum-1955). 
IMPROVEMENTS 
Navigation Page 
1. Alpena Harbor, Mich. .......................... 898 
2. Au Sable Harbor at Au Sable River 
(Oscoda), M ich. .................................... 898 
3. Black River (Port Huron), Mich ........ 899 
4. Bolles Harbor, Mich. ............................ 899 
5. Charlevoix Harbor, Mich. .................... 900 
6. Clinton River, Mich. ............................ 900 
7. Detroit River, Mich. ........................... 901 
8. Frankfort Harbor, Mich. ...................... 901 
9. Grand Haven Harbor and Grand 
River, M ich. ..................................... 902 
10. Grand Marais Harbor, Mich ................ 903 
11. Grays Reefs Passage, Mich. ................. 903 
12. Harbor of Refuge at Harbor Beach, 
Lake Huron, Mich. ........................... 903 
13. Holland Harbor, Mich. ........................ 904 
14. The Inland Route, Mich. .................... 904 
15. Kelleys Island Harbor, Ohio ............... 905 
16. Lake St. Clair, Mich., Channels ........... 905 
17. Les Cheneaux Islands Channels, Mich. 906 
18. Little Lake Harbor, Mich. .................. 906 
19. Ludington Harbor, Mich. .................... 906 
20. Manistee Harbor, Mich. ....................... 907 
21. Manistique Harbor, Mich. ................... 907 
22. Monroe Harbor, Mich. ......................... 907 
23. Muskegon Harbor, Mich. ..................... 908 
24. Pentwater Harbor, Mich. .................. 908 
25. Point Lookout Harbor (Au Gres River), 
M ich ............................. ... ...... 908 
26. 
27. 
28. 
29. 
30. 
31. 
32. 
33. 
34. 
35. 
36. 
37. 
38. 
39. 
40. 
41. 
42. 
43. 
44. 
45. 
46. 
47. 
* All cost and financial statements for projects are listed at the end of 
appear at the end of this chapter. 
Navigation (cont.) Page 
Port Clinton Harbor, Ohio .................. 909 
Port Sanilac Harbor, Mich. ................ 909 
Rouge River, Mich. .............................. 910 
Saginaw River, Mich. ........................... 911 
St. Clair River, Mich. .......................... 911 
St. Joseph Harbor, Mich. .................... 912 
St. Marys River, Mich. ........................ 912 
Saugatuck Harbor and Kalamazoo 
River, M ich. ........................................ 914 
South Haven Harbor, Mich. ............... 914 
Toledo Harbor, Ohio ............................ 914 
White Lake Harbor, Mich. .................. 915 
Whitefish Point Harbor, Mich. .............. 915 
Reconnaissance and Condition Surveys 916 
Other authorized navigation projects .... 916 
Navigation work under special 
authorization ...................................... 916 
Beach Erosion Control 
Authorized beach erosion control 
projects ................................... 916 
Flood Control 
Grand River at Lansing, Mich............. 916 
Kalamazoo River (Kalamazoo), Mich. 916 
Kawkawlin River, Mich. ...................... 917 
River Rouge, Mich. .............................. 917 
Saginaw River, Mich. ........................... 918 
Sebewaing, (Sebewaing River), Mich. .. 919 
this chapter. All other tables are referenced in text and also 
897

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Flood Control (cont.) Page 
48. Inspection of completed flood control 
projects ........................................ 920 
49. Other authorized flood control projects 920 
50. Flood control work under special 
authorization ..................................... 920 
General Investigations Page 
51. Surveys ...... ................. 920 
52. Collection and study of basic data ....... 920 
NAVIGATION 
1. ALPENA HARBOR, MICH. 
Location. At mouth of Thunder Bay River which 
empties into Thunder Bay, Lake Huron. Harbor is 100 
miles southeast of Cheboygan Harbor, Mich. River has 
its source in Montmorency and Alpena Counties, 
Michigan. (See Lake Survey Chart 53.) 
Previous projects. For details see page 1957 of Annual 
Report for 1915 and page 1548 of Annual Report for 
1938. 
Existing project. Provides for a bay channel 200 feet 
wide and 25 feet deep from deep water in Thunder Bay 
to a point 300 feet lakeward of the Alpena Light; 
thence an entrance channel 24 feet deep, narrowing to 
a width of 100 feet at a point 700 feet upstream from 
the light; thence a river channel 100 feet wide 23 feet 
deep to Second Avenue Bridge; thence 18.5 feet deep 
and 75 feet wide for 1,600 feet to upper limit of Federal 
project; a turning basin at upstream end of project, 15 
feet deep and 3.7 acres in area; a new turning basin at 
river mouth 19 feet deep, trapezoidal in shape, with a 
maximum width of 700 feet including the channel 
width and a maximum length of 900 feet along the 
channel line, including removal of existing rubble 
breakwater; and a breakwater about 550 feet long 
paralleling lakeward side of new turning basin. Work 
authorized by the 1965 River and Harbor Act is 
considered inactive. Estimated cost of this portion 
(1969) is $1,100,000 (Federal) and $48,000 (non- 
Federal). (See table 30-B for authorizing legislation.) 
Local cooperation. Act of October 27, 1965 is subject to 
condition that responsible local interests give assurances 
that they will provide lands, easements, and 
rights-of-way for construction and future maintenance 
of project and aids to navigation upon request of the 
Chief of Engineers, including suitable spoil disposal 
areas and necessary retaining dikes, bulkheads and 
embankments therefore, or the costs of such retaining 
works; hold the United States free from damages; 
provide necessary terminal facilities at Abitibi Corp.; 
dredge and maintain areas between Federal improvement 
and terminal facilities to depths commensurate 
with improved Federal channel. Local 
cooperation from previous River and Harbor Acts is 
fully complied with. 
Terminal facilities. Several commercial docks along 
Thunder Bay River used primarily for receipt of coal 
and petroleum products. Also a municipal marina 
basin about 0.25 mile southwest of river mouth. 
Facilities are considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys and miscellaneous services by 
Government forces cost $934. The U. S. hopper dredge 
Hanms performed maintenance dredging in the project 
removing 40,131 cubic yards bin measure, of shoal 
material at a cost of $26,074. Engineering and design, 
construction surveys and layouts, supervision and 
administration cost $7,994. 
Condition at the end of fiscal year. Existing project was 
completed in 1936. The modification of the existing 
project at Alpena Harbor, as authorized by the 1966 
River and Harbor Act, was reclassified into inactive 
status May 22, 1969 based on an unfavorable benefitcost 
ratio. Project features are in good condition. 
Controlling depths (Sept. 1969) are 21 feet in the 
turning basin. Total costs to end of fiscal year for 
existing project were $612,686, of which $318,505 was 
for new work and $294,181 for maintenance. 
2. AU SABLE HARBOR AT AU SABLE 
RIVER (OSCODA), MICH. 
Location. Au Sable River and village of Oscoda, 
Mich., are on west shore of Lake Huron, 8 miles north 
of Au Sable Point, northeast limit of Saginaw Bay. (See 
Lake Survey Chart 52.) 
Previous project. For details see pages 336 and 2453 of 
Annual Report for 1892. 
Existing project. Riprapping outer 200 feet of north 
pier at mouth of Au Sable River, dredging an entrance 
channel 12 feet deep and dredging between piers and 
upstream to State Highway Bridge 10 feet deep. (See 
table 30-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Several small timber pile wharves 
used primarily by commercial fishermen and pleasure 
craft operators; also a private marina basin east of U. S. 
Highway 23 bridge. Facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys and miscellaneous inspection services 
by Government forces cost $1,597. U. S. bucket 
dredge. Tompkins performed maintenance dredging in 
the project removing 4,350 cubic yards scow measure, 
of shoal material at a cost of $11,478. Repairs to the 
breakwaters were accomplished by the Detroit District's 
plant and forces at a cost of $2,607. Engineering 
and design, construction surveys and layouts, supervision 
and administration cost $2,245. 
898

DETROIT, MICH., DISTRICT 
Condition at end of fiscal year. Existing project was 
completed in 1962. Total costs to end of fiscal year for 
existing project were $1,145,821 of which $94,990 was 
for new work (including $16,400 contributed funds) 
and $1,050,831 for maintenance. 
3. BLACK RIVER (PORT HURON), 
MICH. 
Location. This river has its source in the northern part 
of Sanilac County, Mich., is about 60 miles long, and 
flows in a southeasterly direction into the St. Clair 
River. (See Lake Survey Chart 43.) 
Previous projects. For details see page 1441 of Annual 
Report for 1916, and 1554 of Annual Report for 1938. 
Existing project. This provides for a channel 20 feet 
deep from deep water in St. Clair River to the Grand 
Trunk Western Railroad bridge, 160 feet wide at the 
mouth, decreasing to 100 feet about 800 feet from the 
mouth, thence 100 feet wide for 2,600 feet, decreasing 
to 75 feet for a distance of 4,800 feet, widening 2 bends 
to 100 feet, 1 at the foot of 12th Street, and the other 
below the Grand Trunk Western Railroad bridge; for a 
settling basin 75 feet wide and 20 feet deep, beginning 
at the Grand Trunk Western Railroad bridge in Port 
Huron and extending upstream a distance of about 2, 
300 feet; and then for a distance of 2.6 miles as a 100- 
foot wide river channel, 8 feet deep to the 1-94 bridge 
where it decreases to 6 feet deep and continues to the 
vicinity of the Black River Drainage Canal with 
suitable widening where required at bends in the 
channel. The estimated (1970) Federal cost for new 
work is $220,000, excluding $217,000 to be contributed 
by local interest ($205,000 cash contribution and $12, 
000 for spoil disposal retaining dikes). The project 
modification authorized by the Act of August 30, 1935 
is considered to be inactive and is excluded from the 
foregoing cost for new work. The cost of this modification 
was last revised in 1954 and was estimated to 
be $194,000 exclusive of $194,000 to be contributed by 
local interests. (See table 30-B for authorizing 
legislation.) 
Local cooperation. Fully complied with for completed 
portions of project. Assurances required by Act of 
August 30, 1935 have not been provided. Responsible 
local interests must furnish assurances that they will 
contribute one-half of the initial cost of the improvements; 
provide all lands or easements necessary 
to execution of the project; remove existing Tenth 
Street bridge, or replace it with a satisfactory structure; 
and furnish assurances that the United States will be 
protected from all claims for damages incident to the 
improvements. Improvement authorize, on April 23, 
1970 under authority of Section 107 is subject to the 
condition that local interests contribute in cash 50 
percent of the estimated first cost of construction of the 
recommended channel improvement, presently estimated 
at $205,000; provide without cost to the 
United States all lands, easements, and rights-of-way 
required for the construction and subsequent maintenance 
of the project, including suitable areas 
required for disposal of spoil and any necessary 
retaining dikes, or the cost of such retaining dikes, 
presently estimated at $12,000; hold and save the 
United States free from damages due to the construction 
and maintenance of the improvement; 
provide and maintain without cost to the United States 
necessary small craft mooring and servicing facilities, 
and vehicular parking areas with adequate sanitary 
facilities; and provide adequate facilities and establish 
and enforce regulations concerning discharge of 
untreated sewage, garbage, and other pollutants in the 
waters of the improvement by users in accordance with 
applicable laws or regulations of authorities responsible 
for pollution prevention and control. 
Terminal facilities. There are docks on both sides of 
Black River, near its mouth, and between these docks 
and the upper limit of improvement there are 5 other 
docks varying in length from 100 to 500 feet. All docks 
are privately owned and are restricted to the use of the 
owners. The facilities are considered adequate for 
existing commerce. There are a number of marina 
facilities, both public and private, for the use of 
recreational craft. 
Operations and results during fiscal year. New work: 
Preconstruction planning was initiated for the latest 
project modification at a cost of $5,285. Maintenance: 
Miscellaneous inspection services and condition surveys 
were conducted at a cost of $921. 
Condition at end of fiscal year. All work, except that 
authorized by Act of August 30, 1935 and the latest 
project modification, has been completed. Preconstruction 
planning for the latest project modification 
is currently underway. Total costs for existing 
project to end of fiscal year were $485,206 of which $75, 
746 was for new work and $409,460 for maintenance. 
4. BOLLES HARBOR, MICH. 
Location. On west shore of Lake Erie at mouth of La 
Plaisance Creek, 7 miles southwest of Monroe, Mich. 
(See Lake Survey Chart 37.) 
Existing project. Provides for an entrance channel in 
Lake Erie, 8 feet deep and 80 feet wide from deep water 
to a point opposite the outer end of existing jetty, 
thence widening to 100 feet at creek mouth; an access 
channel in La Plaisance Creek, 6 feet deep and 100 feet 
wide at the mouth widening to 120 feet and extending 
to the first bend, thence narrowing to 50 feet wide and 
continuing at that width to the La Plaisance Road 
bridge; a steel sheet pile revetment, about 200 feet long, 
located along Michigan State Conservation Department 
property on west side of channel at creek 
mouth. Project also provides for inclusion of existing 
400-foot long steel sheet pile jetty constructed by 
Michigan State Waterways Commission at the mouth 
of La Plaisance Creek. (See table 30-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. The Monroe Boat Club and three 
marinas provide facilities adequate for existing rec- 
899

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
reational boat traffic. There is also a public launching 
ramp and parking area at Conservation Department 
fishing site at creek mouth. 
Operations and results during fiscal year. New work: The 
contract awarded in November 1966 was terminated at 
the contractors request on September 21, 1968. The 
contract was approximately 88 percent completed 
when terminated. The contract for completion of 
dredging was awarded on 10 June 1969 and was 
completed in October 1969 at a cost of $59,986 charged 
to project funds, balance to surety funds. A hydraulic 
dredge was used to remove 51,449 cubic yards place 
measure. Surveys, engineering and design, construction 
layouts, supervision and administration by Government 
forces cost $2,328. Maintenance: Condition 
surveys and miscellaneous services by Government 
forces cost $4,913. 
Condition at end of fiscal year. Construction of the 
project was initiated during Fiscal Year 1967 and was 
terminated in fiscal year 1969 with 88 percent 
completed by the contractor. The remaining work was 
awarded on 10 June 1969, and was completed during 
FY 1970. 
5. CHARLEVOIX HARBOR, MICH. 
Location. On east shore of Lake Michigan, 276 miles 
northeasterly from Chicago, Ill., and 75 miles northerly 
from Frankfort, Mich. (See Lake Survey Chart 789.) 
Existing project. A channel 18 feet deep from that 
depth in Lake Michigan to that depth in Lake 
Charlevoix, protected where needed by piers and 
revetments. For additional details see page 1476 of 
Annual Report for 1962. (See table 30-B for 
authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. Several small landing places in 
Round Lake at Charlevoix for handling fish and 
miscellaneous commodities, a wharf for petroleum 
products at west end of Lake Charlevoix, and coal 
wharves at Advance and Boyne City at inner end of 
lake. Charlevoix and Boyne City provided public docks 
for small craft. Facilities considered adequate for 
existing commerce. 
Operations and results during fiscal year. Rehabilitation: 
Adjustments in prior year preconstruction planning 
were made at a cost of $7,555. The contract for 
rehabilitation of section C north revetment and sections 
G and J south revetment was continued; $74,612 was 
expended on sections G and J and $90,368 was 
expended on section C. The contract as a whole is 
approximately 65 percent complete. Surveys, construction 
layouts, supervision and administration cost 
$64,826. Maintenance: Condition surveys and miscellaneous 
inspection services by Government forces 
cost $1,406. Preconstruction planning for extension 
to the north revetment was initiated at a cost of 
$19,356. Engineering and design (including prior 
to dredging surveys), supervision and administration 
cost $5,807. 
Condition at end of fiscal year. Existing project was 
completed in 1939. For details on completion of 
existing project see page 1170 of Annual Report for 
1964. Underwater condition surveys of existing struct 
ures were conducted during May 1962. The structures 
recommended for rehabilitation as a result of that 
survey were re-examined in August 1964. The contract 
for repair of the outer 50 feet of section A of the north 
pier and 404 feet of section F south revetment was 
completed in June 1967. A contract for the rehabilitation 
of section C, of the north revetment and 
sections G and J of south revetment was awarded in 
March 1968 and is scheduled for completion in FY 71. 
Remaining navigation structures are generally in good 
condition. 
6. CLINTON RIVER, MICH. 
Location. Has its source in Oakland County, Mich., 
flows easterly about 60 miles and empties into Anchor 
Bay in northwestern part of Lake St. Clair. (See Lake 
Survey Chart 42). 
Previous projects. For details see page 1958 of Annual 
Report for 1915, and page 1556 of Annual Report for 
1938. 
Existing project. An entrance channel in Anchor Bay 8 
feet deep, 300 feet wide at 8-foot depth contour in the 
bay, gradually decreasing to 50 feet wide at about 1, 
000 feet upstream from mouth of Clinton River, a 
length of about 4,600 feet; a channel 8 feet deep and 50 
feet wide in the river about 38,700 feet long from 
entrance channel upstream to Mt. Clemens at Cass 
Avenue; closing old channel and making a cutoff at 
Shoemakers Bend; closing Catfish Channel; construction 
of revetments as needed in the river; and a 
harbor basin, 5 feet deep and 11 acres in area at 
entrance along bay channel, protected by breakwaters 
on north and south sides. (See table 30-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. River is used exclusively by 
recreational craft. There are numerous public and 
private piers and wharves along river below the city. 
They are considered adequate. 
Operations and results during fiscal year. Maintenance: 
Condition surveys and miscellaneous inspection services 
by Government forces cost $5,508. Preconstruction 
planning for riprapping south breakwater was initiated 
at a cost of $2,141. A contract for construction of 
perimeter embankment was awarded in September 
1969 and completed in June 1970 at a cost of $47,526. 
Engineering and design, supervision and administration 
cost $9,705. 
900

DETROIT, MICH., DISTRICT 
Condition at end of fiscal year. Existing project was 
completed in 1966. Total costs to end of fiscal year were 
$1,008,204 of which $234,546 was for new work, $483, 
906 for maintenance, and $289,752 contributed funds 
for new work. 
7. DETROIT RIVER, MICH. 
Location. One of the Great Lakes connecting channels, 
31 miles long and flows south from Lake St. Clair 
to Lake Erie. (See Lake Survey Chart 41.) 
Previous projects. For details see page 1958 of Annual 
Report for 1915, and page 1541 of Annual Report for 
1938. 
Existing project. Improving Detroit River main 
channels to provide 25.5-foot draft navigation; improving 
certain auxiliary and side channels; and 
construction of various water level and crosscurrent 
control structures. Details are in accompanying table 
30-C. Project depths are referred to local low water 
datum plans which correspond to low water datums for 
Lakes St. Clair and Erie, 571.7 and 568.6 feet above 
mean water level at Father Point, Quebec 
(International Great Lakes Datum - 1955). (See table 
30-B for authorizing legislation.) 
Estimated (1970) cost for new work, exclusive of 
amounts expended on previous projects, is $116,570, 
000. 
Local cooperationn Fully complied with for completed 
portions of project. For Trenton Channel modification 
approved May 17, 1950, responsible local agencies 
must furnish lands, rights-of-way, and spoil disposal 
areas for construction and future maintenance and 
hold the United States free from damages. Assurances 
required by act of May 17, 1950, have not been 
provided. No local cooperation is required for modifications 
authorized by acts of July 1946 and March 
1956. For Trenton Channel modification approved 
August 13, 1968, local cooperation requirements are to 
hold and save the United States free from damages due 
to construction and maintenance of the improvement; 
when and where needed, provide and maintain depths 
in berthing areas and local access channels serving the 
terminals commensurate with the depths provided in 
the related project areas; accomplish alterations to the 
lower Grosse Ile bridge and to submarine utility 
crossings, as required by the improvement; construct a 
fully integrated steel plant at the Gibraltar site; 
provide without cost to the United States all lands, 
easements, and rights-of-way required for construction 
and subsequent maintenance of the project including 
compensating dikes, and for aids to navigation, upon 
the request of the Chief of Engineers, including suitable 
areas determined by the Chief of Engineers to be 
required in the general public interest for initial and 
subsequent disposal of excavated materials. 
Terminal facilities. Numerous commercial installations 
used for handling coal, iron ore, limestone, steel 
products, petroleum products, and other items such as 
overseas general cargo. Detail on actual port and 
harbor facilities is in Port Series No. 45 (revised 1961) 
prepared and published as part 2 by Board of 
Engineers for Rivers and Harbors. Information on port 
administration and Federal services, port and terminal 
services and charges, and steamship services is prepared 
and published as part I by Port Development 
Staff, U. S. Department of Commerce. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Minor design studies concerning compensating works 
and channel improvements in the Detroit River were 
continued. Maintenance: Preliminary studies and field 
investigations for development of a maintenance 
dredging spoil disposal area at the lower end of the 
Detroit River were initiated. Miscellaneous inspection 
services, preparation and publication of connecting 
channels depth bulletins, and condition surveys by 
Government plant and hired labor cost $149,882. The 
U. S. hopper dredges Hains, Hoffman, and Markham 
performed maintenance dredging, removing 303,836 
cubic yards, 186,666 cubic yards and 322,689 cubic 
yards respectively, bin measure, of shoal material at a 
cost of $274,686. The contract for elevating the spoil 
dikes on the Grassy Island area was transferred to the 
Rouge River project. Location and removal of obstructions 
in rock channels continued during fiscal year 
by U. S. derrickboat Michigan at a cost of $150,590. 
Costs under the Greak Lakes Pilot Program were $996. 
Engineering and design; real estate activities; construction 
layouts and surveys; supervision and administration 
cost $86,702. 
Condition at the end of fiscal year. Latest modification of 
connecting channels project in the Detroit River is 
complete except for compensating works. All work in 
Trenton Channel is complete except extension of 
turning basin authorized by Act of May 17, 1950, and 
extension and deepening of the lower reach authorized 
by Act of August 13, 1968. Pertinent data concerning 
channels covered by project at end of fiscal year is set 
forth in table 30-C. 
Costs for existing project were $81,528,359 of which 
$74,449,765 was for new work ($72,969,077 regular 
funds and $1,530,688 Public Works Funds) and $7,028, 
594 for maintenance. 
8, FRANKFORT HARBOR, MICH. 
Location. On east shore of Lake Michigan, 204 miles 
northeasterly from Chicago and 28 miles northerly 
from Manistee, Mich. (See Lake Survey Chart 77.) 
Existing project Provides for constructing an exterior 
basin in Lake Michigan formed by two breakwaters, 
450 feet apart at the outer ends, diverging at an angle 
of about 90 degrees, the main arm and shore 
connection on north breakwater are 972 and 1,000 feet 
long, respectively, and the main arm and shore 
connection of south breakwater 1,188 and 1,400 feet 
long, respectively; for removing 801 feet of north and 1, 
901

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
172 feet of south pier; dredging basin 20 feet deep and 
800 feet wide at entrance, decreasing toward new pier 
heads to 600 feet wide, dredging approach and 
entrance channel through outer basin to a depth of 24 
feet from deep water in Lake Michigan to a point 500 
feet landward of opening between breakwaters, over 
the entire width outside the breakwaters and to a 
maximum width of 500 feet inside the breakwaters; 
thence to 23 feet deep through inner portion of outer 
basin to outer end of north pier, over widths decreasing 
from 500 to 160 feet; and thence to 22 feet deep 
between the piers to the inner basin in Lake Betsie; 
dredging an 18-foot deep interior basin in Lake Betsie 
from within 50 feet of existing structures on the west 
and extending eastward about 1,550 feet to easterly 
boundary and from within 50 feet of existing structures 
on the north and extending southward 800 feet to the 
southerly boundary; dredging a recreational craft 
anchorage area 10 feet deep and 300 feet wide, 
extending 600 feet eastward of the east limit of the 
interior basin, with its north side in line with the north 
limit of the basin. Breakwaters and shore connections 
are built of concrete caissons and piling capped with 
concrete. Inner piers and revetments are built of 
stonefilled timber cribs and piling, all capped with 
concrete, except for 476 feet of south revetment which 
consists of steel sheet piling. (See table 30-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Two car ferry slips on south shore 
and several docks along north shore of Lake Betsie. The 
city and State provide a recreational docking facility 
on north side of Lake Betsie which is open to all on 
equal terms. There is also a marine railway capable of 
handling small craft. Facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. New Work: 
Adjustments in preconstruction planning in connection 
with the latest project modification were made at a cost 
of $-671. The U. S. bucket dredge Tompkins completed 
the latest project modification by dredging in the 
manuevering and anchorage areas in October 1969. 
The Tompkins removed 4,750 cubic yards scow measure, 
at a cost of $12,774. Surveys, construction layouts, 
supervision and administration costs in connection 
with hired labor were $2,704. Adjustments in the 
amount of $2,282 were made in the prior years contract 
for dredging in the manuevering and anchorage areas. 
Surveys, construction layouts, supervision and administration 
cost -$466. Maintenance: Condition 
surveys and miscellaneous inspection services by 
Government forces cost $6,667. The U. S. hopper 
dredge Hains performed dredging in the project 
removing 69,347 cubic yards, bin measure, of shoal 
material at a cost of $27,525. Costs under the Great 
Lakes Pilot Program were $508. Engineering and 
design, supervision and administration cost $13,325. 
Condition at end of fiscal year. Existing project was 
completed in October 1969. Breakwaters, shore connections, 
and revetments are in generally good condition. 
For additional details on completion of existing 
project see page 1474 of Annual Report for 1962. Total 
costs for existing project to end of fiscal year were $3, 
694,161 of which $1,955,159, (including $31,709 
contributed funds) was for new work, $1,464,226 for 
maintenance, and $274,776 for rehabilitation. 
9. GRAND HAVEN HARBOR AND 
GRAND RIVER, MICH. 
Location. Harbor is on east shore of Lake Michigan, 
108 miles northeasterly from Chicago, Ill., and 23 miles 
northerly from Holland, Mich. River rises in Jackson 
County, Mich., and flows 260 miles westerly into Lake 
Michigan. (See Lake Survey Chart 765, and Geological 
Survey Grand Rapids quadrangle.) 
Previous projects. For details see page 1949 of Annual 
Report for 1915, and page 1481 of Annual Report for 
1938. 
Existing project. An entrance channel protected by 
parallel piers and revetments at mouth of Grand River, 
a deep draft channel in river extending to Spring Lake, 
a turning basin, and a shallow draft channel in river 
extending 14.5 miles upstream to Bass River. Project 
depths are 23 feet in entrance channel, 21 feet in river 
to turning basin, 18 feet in turning basin and channel 
to Spring Lake, and 8 feet in upper Grand River 
channel. For additional details see page 1461 of 
Annual Report for 1962. Dredging on northerly side of 
inner channel is considered inactive. Estimated cost of 
this portion (1954) is $38,600. (See table 30-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Several wharves for handling coal, 
limestone, sand and gravel, petroleum products, fish 
and miscellaneous commodities. There is also a car 
ferry slip which is inactive. Facilities considered 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
were performed using Government forces at a cost 
of $18,205. The U. S. hopper dredge Hains performed 
maintenance dredging in the project removing 111,576 
cubic yards bin measure at a cost of $70,124. 
Adjustments in the amount of $3,427 were made in the 
prior year cost of maintenance dredging with the U. S. 
bucket dredge Tompkins Chicago District's hydraulic 
dredge Depoe Bay also performed maintenance dredging 
in the Grand River Channel by removing 13,823 
cubic yards, place measure, at a cost of $50,482. 
Repairs were made to the north pier and revetment 
during the fiscal year by the Chicago District's plant 
and forces at a cost of $11,393. Repairs were made to 
the north pier and revetment during the fiscal year by 
the U. S. bucket dredge Tompkins at a cost of $23,192. 
Preconstruction planning for reconstruction of south 
902

DETROIT, MICH., DISTRICT 
pier (sections L, M, Q, and R) was continued at a cost 
of $25,226. Studies under the Great Lakes Pilot 
Program cost $16,410. Engineering and design, supervision 
and administration cost $42,096. 
Condition at end of fiscal year. Existing project was 
substantially completed in 1949. For additional details 
on completion of existing project see page 1463 of 
Annual Report for 1962. Project structures are generally 
in good condition except for sections F and G of 
the north revetment which were not included in the 
recently completed rehabilitation program. Sections F 
and G are scheduled for repairs. Recent inspection 
disclosed increased deterioration. Preconstruction 
planning for the reconstruction of sections, L, M, Q, 
and R of the south pier was continued during fiscal 
year 1970. Total costs of existing project to end of fiscal 
year were $8,495,148 of which $972,140 was for new 
work, $6,709,395 for maintenance and $813,613 for 
rehabilitation. 
10. GRAND MARAIS HARBOR, MICH. 
Location. On south shore of Lake Superior, 93 miles 
west of Sault Ste. Marie, Mich. (See Lake Survey 
Chart 92.) 
Existing project. Provides for a channel protected by 
parallel piers and for closing natural entrance channel 
with a pile dike. Project depths are 18 feet between 
piers and 20 feet in lake approach. For additional 
details see page 1449 of Annual Report for 1962. (See 
table 30-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. Several small piers, a Coast Guard 
Station, and a small boat pier and launching ramp 
built by the State of Michigan provide facilities 
adequate for present traffic. 
Operations and results during fiscal year. Rehabilitation: 
The contract for rehabilitation of approximately 1,817 
feet of west pier section A and B and approximately 
705 feet of east pier section B awarded in August 1968 
was continued. $161,488 was expended on the rehabilitation 
of the west pier and $101,332 on the east 
pier. The contract as a whole is approximately 52 
percent complete at a cost of $326,500 and scheduled 
for completion in November 1970. Surveys, construction 
layouts, supervision and administration cost is 
$34,876. 
Condition at end of fiscal year. Existing project is 
complete except for widening a portion of channel from 
250 to 300 feet. The 1954 estimated cost of this inactive 
part of the project is $10,000. For additional details on 
condition and completion of existing project see page 
1292 of Annual Report for 1963. A contract for 
rehabilitation of sections A and B of the west pier and 
section B of the east pier was awarded in fiscal year 
1969 and is scheduled for completion in fiscal year 
1971. Controlling depth (June 1969) is 16 feet. 
11. GRAYS REEF PASSAGE, MICH. 
Location. Between Grays Reef and Vienna Shoal, in 
the northeasterly end of Lake Michigan, lying easterly 
of Beaver, Fox, and Manitou Islands. (See Lake Survey 
Chart 79.) 
Existing project. Provides for the improvement of 
Grays Reef Passage over a width of 3,000 feet and a 
depth of 25 feet through the east channel. (See table 
30-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. The passage is a through, unprotected 
waterway having no terminal facilities. 
Operations and results during fiscal year. Maintenance: 
Condition surveys and miscellaneous inspection services 
by Government forces cost $6,789. Location and 
removal of obstructions was accomplished by Government 
Plant and hired labor at a cost of $104,894. 
The U. S. hopper dredge Markham completed maintenance 
dredging in the project removing 395,756 
cubic yards bin measure at a cost of $263,139. 
Engineering and design, construction surveys and 
layouts, supervision and administration cost $40,274. 
Condition at end of fiscal year. The existing project was 
completed in 1937. For additional details on completion 
of existing project see page 1259 of Annual 
Report for 1937. 
12. HARBOR OF REFUGE AT HARBOR 
BEACH, LAKE HURON, MICH. 
Location. On west shore of Lake Huron about 60 miles 
north of Port Huron, Mich. (See Lake Survey Chart 
51.)
Existing project. Harbor of refuge protected by three 
breakwaters; a main entrance 23 feet deep; and an 
anchorage area 21 feet deep. For additional details see 
page 1485 of Annual Report for 1962. (See table 30-B 
for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. Coal and limestone are received at 
a private wharf. In addition there is a public 
recreational craft pier, a Coast Guard pier, and several 
small installations engaged in docking and servicing 
light-draft commercial and recreational vessels. These 
facilities satisfy current commerce and traffic requirements. 
Operations and results during fiscal year. Maintenance: 
Condition surveys were made by Government forces at 
a cost of $1,274. Repairs to the breakwaters were 
initiated by Chicago District plant and force at a cost of 
$57,000. Repairs to the breakwaters were accomplished 
by the Detroit District's plant and forces at 
a cost of $4,537. Construction surveys and layouts, 
supervision and administration cost $7,528. Studies 
were made under the Great Lakes Pilot Program at a 
cost of $124. 
903

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end of fiscal year. Existing project was 
completed in 1928. For additional details on completion 
of existing project see Annual Report for 1962. 
The structures are in generally good condition. Repairs 
to section E, main breakwater, were completed during 
fiscal year 1970. 
13. HOLLAND HARBOR, MICH. 
Location. On east shore of Lake Michigan 95 miles 
northeasterly from Chicago, Ill., and 23 miles southerly 
from Grand Haven, Mich. (See Lake Survey Chart 
763.) 
Previous project. For details see page 1948 of Annual 
Report for 1915, and page 1478 of Annual Report for 
1938. 
Existing project. An outer breakwater protected 
approach channel in Lake Michigan, an entrance 
channel to Lake Macatawa protected by piers and 
revetments, a channel through Lake Macatawa into 
Black River, and a turning basin. Project depths are 23 
feet in outer portion of approach channel decreasing to 
21 feet at outer end of inner piers, 21 feet to upper end 
of project, and 18 feet in turning basin. For additional 
details see page 1458 of Annual Report for 1962. 
Widening bend of entrance channel into Lake Macatawa 
is considered inactive. Estimated cost of this 
portion(1956) is $449,500. (See table 30-B for 
authorizing legislation.) 
Local cooperation. Fully complied with for completed 
portions of project. Work authorized by act of 1954 is 
subject to condition that work on either or both 
proposed modifications may be undertaken by the 
United States provided local interests furnish all lands 
except 1.5 acres of Federal lands, easements, rights-ofway, 
and suitable spoil disposal areas for initial work 
and future maintenance; remove buildings and other 
structures, except existing revetments, from lands to be 
furnished; and hold the United States free from 
damages. 
Terminal facilities. Wharves are at inner end of Lake 
Macatawa, and used for handling coal, building 
materials, petroleum products, and miscellaneous 
commodities. Two shipbuilding yards are on south 
shore of the lake. Holland provides a public wharf for 
small craft. Facilities are considered adequate for 
existing commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys, miscellaneous inspection and real 
estate services by Government forces cost $14,783. U. S. 
hopper dredge Hains performed maintenance dredging 
in the project removing 99,980 cubic yards, bin 
measure, at a cost of $90,999. Adjustments in the 
amount of $3,221 were made in the cost of prior year 
dredging performed by the U. S. bucket dredge 
Tompkins. Placement of stone on the breakwaters was 
accomplished by Chicago District's plant and forces at 
a cost of $4,164. Studies under the Great Lakes Pilot 
Program cost $145. Engineering and design, supervision 
and administration cost $30,261. 
Condition at end of fiscal year. Existing project, with 
exception of widening bend in revetted entrance 
channel authorized by act of September 3, 1954, was 
completed in 1967. All structures are generally in good 
condition except sections F and G of the north 
revetment which were not included in the rehabilitation 
program. For additional details on completion 
of existing project see page 1460 of Annual 
Report for 1962. Cost of existing project to end of fiscal 
year was $595,221 for new work ($559,516 regular 
funds and $35,705 contributed funds), $2,330,993 
regular funds for maintenance, and $502,452 regular 
funds for rehabilitation, a total of $3,428,666. 
14. THE INLAND ROUTE, MICH. 
Location. A series of interconnected lakes and streams 
stretching across northern tip of Lower Peninsula of 
Michigan, and extends from Conway near Lake 
Michigan to Cheboygan on Lake Huron; a distance of 
35 miles. Crooked and Indian Rivers are connecting 
channels in the waterway. (See Lake Survey Chart 
660.) 
Existing project. Provides for a channel 30 feet wide 
and 5 feet deep, with necessary widening at bends, 
through Crooked and Indian Rivers, and Crooked, 
Burt, and Mullett Lakes, and from Conway (west end 
of Crooked Lake) to navigation lock at Cheboygan; in 
Pickerel Channel from Pickerel Lake to Crooked Lake. 
It also provides for suitable jetties at head of Indian 
River. The addition of a lock and dam was approved 
by the Chief of Engineers on September 2, 1964, to 
correct a design deficiency. (See table 30-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. None for commercial cargo handling 
exist along the Crooked and Indian Rivers. 
Numerous small privately owned timber piers and 
wharves, some equipped with cover boat wells for 
serving and storing recreational craft, have been 
constructed. Landings maintained by hotel and resort 
operators are open to the public for transfer of 
passengers. Public docks are at Conway and Oden on 
Crooked Lake; the village of Indian River, Topinabee, 
and Mullett Lake Village on Mullett Lake; and at 
Cheboygan. About 30 highways dead end at the 
water's edge, permitting public access for various 
marine activities. Dock facilities are considered adequate 
for existing traffic. 
Operations and results during fiscal year. New work: An 
adjustment of $103 was made in prior year's cost for 
engineering and design. Maintenance: Condition 
surveys were performed by Government forces at a cost 
of $15,614. The navigation lock was maintained and 
operated on a two shift basis from July 1 through 
November 15. The lock was reopened for navigation on 
15 April 1970 and was operated on a two shift basis. 
904

DETROIT, MICH., DISTRICT 
During the period, a total of 12,442 vessels passed 
through the lock in 9,029 lockages. Cost for the fiscal 
year was $42,157; all hired labor. Maintenance 
dredging was performed on the channels and canals by 
a rented hydraulic dredge at a cost of $864. 
Condition at end of fiscal year. The existing project was 
completed in 1958. The lock and dam was completed 
in fiscal year 1968. For additional details see page 1382 
of Annual Report for 1960. 
15. KELLEYS ISLAND HARBOR, OHIO 
Location. On north side of Kelleys Island in western 
Lake Erie between Marblehead, Ohio and Pelee 
Island, Ontario, about 12 miles north of Sandusky 
Harbor, Ohio. (See Lake Survey Chart 364.) 
Existing project. Provides for two breakwaters having 
an aggregate length of about 1,100 feet with recreational 
fishing facilities provided thereon; a flared 
approach channel 12 feet deep, decreasing in width to 
100 feet between the breakwaters; an entrance channel 
10 feet deep and varying in width from 300 feet, at a 
point about 200 feet offshore, to 150 feet at the 
shoreline; and an access and maneuvering area of 
about 4.3 acres, 8 to 10 feet deep. Estimated (1970) 
Federal cost for new work is $700,000 excluding $700, 
000 to be contributed by local interests. Estimated total 
cost to local interests is $2,522,000. 
Local cooperation. Responsible local interests must 
furnish assurances that they will contribute in cash 50 
percent of the first cost of construction of the recommended 
improvement for recreational navigation 
if the total cost is less than $2,000,000, or if the first cost 
exceeds $2,000,000 the amount in excess of $1,000,000 
of this first cost, such contribution presently estimated 
at $700,000. The required amount shall be paid in a 
lump sum prior to initiation of construction, or in 
installments over the construction period at a rate 
proportionate to the proposed or scheduled expenditure 
of Federal funds as required by the Chief of 
Engineers, the final apportionment of cost to be made 
after actual costs have been determined; provide 
without cost to the United States all lands, easements, 
and rights-of-way required for construction and 
subsequent maintenance of the project and for aids to 
navigation upon the request of the Chief of Engineers, 
including suitable areas determined by the Chief of 
Engineers to be required in the general public interest 
for initial and subsequent disposal of spoil and any 
necessary retaining dikes, bulkheads, and embankments 
therefore, or the cost of such retaining 
works; hold and save the United States free from all 
claims for damages incident to the construction, 
operation, and maintenance of the improvement; 
establish a competent and properly constituted public 
body empowered to regulate the use, growth, and 
development of the harbor and related facilities with 
the understanding that said facilities will be open to all 
on equal terms; provide and maintain without cost to 
the United States necessary mooring facilities, a public 
landing with suitable supply facilities, a launching 
ramp, reservation of space for transient craft, parking 
areas with adequate sanitary facilities and access roads, 
open to all on equal terms; the dredging of berthing 
areas to be commensurate with the depth of the Federal 
channel improvements; provide facilities and establish 
and enforce regulations concerning discharge of 
untreated sewage, garbage, and other pollutants in the 
waters of the harbor by users thereof, which regulations 
shall be in accordance with applicable laws or 
regulations of Federal, State, and local authorities 
responsible for pollution prevention and control; and 
with respect to the recreational fishing facilities: (1) 
contribute in cash the entire cost of modifications 
necessary to provide for recreational fishing on the 
breakwaters and associated access facilities, parking 
areas, and sanitary facilities if the cost of the navigation 
improvements is or exceeds $2,000,000. (2) bear all 
costs of maintenance, operation, and replacement of 
the modifications and associated access facilities, 
parking areas, and sanitary facilities, the amount 
involved being currently estimated at $700 on an 
average annual basis. Provided that should the cost of 
the navigation facilities be less than $2,000,000, the 
Federal Government would participate in the first cost 
of the recreational fishing facilities by an amount not to 
exceed 50 percent of the cost of such facilities, provided 
the total Federal cost for both navigation and recreational 
fishing facilities does not exceed $1,000,000. 
It is further provided that the improvement for 
navigation may be undertaken independently of 
providing public recreational facilities for breakwater 
fishing whenever the required local cooperation for 
navigation has been furnished. 
Operations and results during fiscal year. Preconstruction 
planning was continued at a cost of $2,000. The State 
of Ohio has been requested to provide assurances of 
local cooperation. 
Condition at end of fiscal year. Construction has not 
started. 
16. LAKE ST. CLAIR, MICH., CHANNELS 
Location. Lake St. Clair, a section of Great Lakes 
connecting channels, is an expansive shallow basin 
having a vessel track length of about 15 miles from 
mouth of St. Clair River to head of Detroit River. (See 
Lake Survey Chart 42.) 
Previous projects. For details see page 2882, Annual 
Report for 1896; pages 1957-58, Annual Report for 
1915; and page 1539, Annual Report for 1938. 
Existing project. An improved channel through Lake 
St. Clair 800 feet wide, 27.5 feet deep, and about 14.5 
miles long; extending from mouth of Southeast Bend 
cutoff channel at lower end of St. Clair River to head of 
Detroit River Channel. (See Table 30-B for authorizing 
legislation). 
Local cooperation. None required. 
905

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Terminal facilities. None. 
Operations and results during fiscal year. Maintenance: 
Condition surveys, miscellaneous inspection services, 
preparation and publication of water level bulletins on 
channel depths by Government forces cost $19,614. 
Engineering and design, supervision and administration 
cost $26,795. 
Condition at end of fiscal year. Existing project was 
completed in fiscal year 1962. Total costs for existing 
project at end of fiscal year were $9,007,434 of which 
$7,019,177 was for new work ($6,010,582 regular funds 
and $1,008,595 public works fund) and $1,988,257 for 
maintenance. 
17. LES CHENEAUX ISLANDS CHANNELS, 
MICH. 
Location. Along the north shore of Lake Huron, about 
20 miles northeast of Mackinac Island, Michigan. (See 
Lake Survey Chart 601.) 
Existing project. Provides for removing shoals from Les 
Cheneaux Islands Channels on the presently designated 
Small Boat Course, including the Middle 
Entrance between Marquette and Little LaSalle 
Islands, to provide a depth of seven feet over a 
minimum width of 100 feet, with suitable widening 
where required at bends in the channel. (See Table 
30-B for authorizing legislation). 
Local cooperation. Fully complied with. 
Terminal facilities. Privately owned marinas, open to 
the public, are located at Hessel and Cedarville. There 
are also numerous other docks located on the islands 
which are not open to the general public. These 
facilities are considered adequate for existing commerce 
and vessel traffic. 
Operations and results during fiscal year. New work: 
Engineering and design costs for fiscal year were $2, 
017. The channel's dimensions were reduced from 200 
to 100 feet wide and 8 to 7 feet deep with the approval 
of OCE on September 10, 1968. The contract for 
dredging the navigation channel was awarded on 11 
June 1970 at a cost of $139,380. Supervision and 
administration cost $318. 
Condition at end of fiscal year. Construction of the 
project using hired labor commenced in fiscal year 
1968 and 17 percent of the excavation was completed. 
The remaining work is scheduled for completion by 
October 1970. 
18. LITTLE LAKE HARBOR, MICH. 
Location. On south shore of Lake Superior 21 miles 
west of Whitefish Point and 30 miles east of Grand 
Marais, Mich. (See Lake Survey Chart 92.) 
Existing project. Provides for a small-craft harbor of 
refuge by dredging an entrance channel 12 feet from 
Lake Superior into Little Lake, suitably protected by 
breakwaters and revetments. (See table 30--B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Only terminal facility at project site 
consists of a public dock built by State of Michigan for 
light-draft craft. 
Operations and results during fiscal year. Maintenance: 
Condition surveys and miscellaneous inspection by 
Government forces cost $1,431. The U. S. bucket 
dredge Tompkins performed maintenance dredging in 
the project removing 40,690 cubic yards, scow measure, 
at a cost of $66,599. Engineering and design, supervision 
and administration cost $14,025. 
Condition at end of fiscal year. This project is considered 
complete, however, because of shifting sand the harbor 
entrance shoals rapidly with the result that full project 
depth is not usually available. 
19. LUDINGTON HARBOR, MICH. 
Location. On east shore of Lake Michigan, 156 miles 
northeasterly from Chicago, Ill., and 67 miles northerly 
from Grand Haven, Mich. (See Lake Survey Chart 
774.) 
Previous projects. For details see page 1951 of Annual 
Report for 1915, and page 1491 of Annual Report for 
1938. 
Existing project. A breakwater protected outer basin in 
Lake Michigan and an entrance channel from Lake 
Michigan to Pere Marquette Lake protected by piers 
and revetments. Project depth in outer basin and 
channel between inner piers is 18 feet. For additional 
details see page 1307 of Annual Report for 1963. (See 
table 30-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. In addition to main terminal of 
Chesapeake & Ohio Railway Co., consisting of three 
car ferry slips, a wharf, and warehouses, there are 
several wharves which handle coal, limestone, and 
miscellaneous commodities. Facilities adequate for 
existing commerce. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government forces cost $5,334. The U. S. 
hopper dredge Hains performed maintenance dredging 
in the project removing 41,036 cubic yards, bin 
measure, of shoal material at a cost of $24,762. 
Preconstruction planning for stone protection of the 
north breakwater was completed at a cost of $34,471. A 
contract for stone protection was awarded in June 1970 
in the amount of $1,362,537. Work was not started in 
FY 1970. Engineering and design, supervision and 
administration cost $7,358. 
Condition at end of fiscal year. Existing project was 
completed in 1918. Project structures are generally in 
good condition except for sections B and C of the north 
breakwater where extensive deterioration is indicated; 
repairs will be initiated in FY 1971. For additional 
details on completion of existing project see page 1469 
of Annual Report for 1962. Total costs for existing 
906

DETROIT, MICH., DISTRICT 
project from regular funds to end of fiscal year were $5, 
001,867 of which $1,036,086 was for new work, $3,607, 
867, for maintenance, and $357,914 for rehabilitation. 
20. MANISTEE HARBOR, MICH. 
Location. On east shore of Lake Michigan, 179 miles 
northeasterly from Chicago, Ill., and 26 miles northerly 
from Ludington, Mich. (See Lake Survey Chart 776.) 
Previous projects. For details see page 1952 of Annual 
Report for 1915, and page 1493 of Annual Report for 
1938. 
Existing project. An entrance channel in Lake Michigan 
protected by a breakwater, piers, and revetments; 
a channel in Manistee River to Manistee Lake; and 
Federal participation in cost of replacing Maple Street 
Bridge. Project depths are 25 feet in entrance channel 
and 23 feet in river channel. For additional details see 
page 1470 of Annual Report for 1962. (See table 30-B 
for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Installations are on both sides of 
river and on Manistee Lake. Commerce handled 
includes coal, sand, salt, and general cargo. In 
addition, there is a Government wharf and a city 
owned recreational craft pier which is open to public. 
These facilities satisfy current commerce requirements. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government forces cost $16,544. The U. S. 
hopper dredge Hains and Tompkins performed maintenance 
dredging in the project removing 79,841 cubic 
yards, bin measure and 3,950 cubic yards scow measure 
at a cost of $45,326 and $17,949 respectively. Adjustments 
in the amount of -$13,461 were made in 
prior year cost of stone work by the Chicago District. 
Repairs made to the north revetment by the Detroit 
District's plant and forces cost $25,810. Studies and 
reports of dredge spoil disposal methods under the 
Great Lakes Pilot Program cost $149. Engineering and 
design, supervision and administration cost $18,843. 
Condition at end of fiscal year. Existing project was 
completed in August 1967. For additional details on 
completion of existing project see page 1470 of Annual 
Report for 1962. Navigation structures are in generally 
good condition. Total costs for existing project from 
regular funds to end of fiscal year were $5,559,226 of 
which $2,341,523 was for new work, $1,843,539 for 
maintenance, and $1,374,164 for rehabilitation. 
21. MANISTIQUE HARBOR, MICH. 
Location. On north shore of Lake Michigan 135 miles 
northeasterly from Green Bay Harbor, Wis., and 220 
miles northerly from Milwaukee, Wis. (See Lake 
Survey Chart 701.) 
Previous projects. For details see page 1933 of Annual 
Report for 1915 and page 1422 of Annual Report for 
1938. 
Existing project. A breakwater protected entrance 
channel in Lake Michigan, a channel in Manistique 
River, and a pier at river mouth. Project depths are 19 
feet in outer portion of entrance channel, 18 feet in 
inner portion of entrance channel, and 18 feet in river 
channel. For additional details see page 1451 of 
Annual Report for 1962. (See table 30-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. A car ferry slip, two coal and 
building material wharves, two fishing wharves, and 
numerous lumberyard slips. Facilities are considered 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Inspection services and condition surveys cost $983. 
Repairs to the breakwaters by the Chicago District's 
plant and forces cost $14,889. Supervision and administration 
cost $595. 
Condition at end of fiscal year. Existing project was 
completed in 1961. For additional details on completion 
of existing project see Annual Report for 1962. 
All structures are generally in good condition. Total 
costs to end of fiscal year were $2,986,679 of which $1, 
295,400 was for new work $1,374,946 for maintenance, 
and $316,333 for rehabilitation. 
22. MONROE HARBOR, MICH. 
Location. On lower reach of Raisin River, which 
empties into Lake Erie and is 36 miles south of Detroit, 
Mich. (See Lake Survey Chart 376.) 
Existing project. Provides for a channel in Lake Erie 
and Raisin River to city of Monroe, for a turning basin, 
and for riprapping protecting dikes at river mouth. 
Project depths are 21 feet to turning basin, 18 feet in 
turning basin, and 9 feet to upstream end of project. 
For additional details see page 1490 of Annual Report 
for 1962. Project feature for riprapping protecting dikes 
is considered inactive. Estimated cost of this feature 
(1954) is $90,000. (See table 30-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Several privately owned docks and 
a municipal terminal. Port of Monroe Authority built a 
steel and concrete wharf on southeast side of turning 
basin for commercial use. Facilities are considered 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government forces cost $4,008. U. S. hopper 
dredge Hoffman performed maintenance dredging in 
the project removing 294,112 cubic yards bin measure 
of shoal material at a cost of $104,591. Hopper dredge 
pumpout facilities were provided for the diked disposal 
area at a cost of $39,799. Study and report of dredge 
spoil disposal methods under the Great Lakes Pilot 
Program cost $1,662. Engineering, design, supervision 
and administration cost $23,969. 
907

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end of fiscal year. Existing project was 
completed in 1936, except for riprapping protective 
dikes on each side of the Bay Channel. Due to 
combined effect of severe storms and continued high 
water, dikes have largely disappeared. 
23. MUSKEGON HARBOR, MICH. 
Location. On east shore of Lake Michigan, 114 miles 
northeasterly from Chicago, Ill., and 80 miles easterly 
from Milwaukee, Wis. (See Lake Survey Chart 767.) 
Previous projects. For details see page 1950 of Annual 
Report for 1915; page 1399, Annual Report for 1924; 
and page 1484; Annual Report for 1938. 
Existing project. A breakwater protected outer basin in 
Lake Michigan and an entrance channel from Lake 
Michigan to Muskegon Lake protected by piers and 
revetments. Project depths vary from 29 feet in the 
lakeward protion of the outer basin to 27 feet in the 
channel between the inner piers to Muskegon Lake. 
For additional details see page 1303 of Annual Report 
for 1963. (See table 30-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Several privately owned wharves 
primarily for commercial use. Details on actual port 
and harbor facilities are in Port Series, No. 48 (revised 
1961) prepared and published as part 2 by Board of 
Engineers for Rivers and Harbors. Information on port 
administration and Federal services, port and terminal 
services and charges, and steamship services is prepared 
and published as part I by the Port Development 
Staff, U. S. Department of Commerce. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
were performed during fiscal year using Government 
plant forces at a cost of $8,388. The U. S. 
hopper dredge Hains and the U. S. bucket dredge 
Tompkins performed maintenance dredging in the 
project removing 42,346 cubic yards bin measure, and 
2,700 cubic yards scow measure, at a cost of $45,969 
and $16,615, respectively. Adjustment for repairs made 
to the north breakwater during prior fiscal year by 
Chicago District's Plant and forces cost -$3,457 Costs 
incurred under the Great Lakes Pilot Program were 
$125. Engineering and design, supervision and administration 
cost $16,487. 
Condition at the end of fiscal year. Existing project was 
completed in 1965. For additional details on completion 
of existing project see page 1465 of Annual 
Report for 1962. The navigation structures are in 
generally good condition except for sections C and D, 
south breakwater which are scheduled for repairs. 
Recent surveys revealed cracks and breaks in the 
concrete, thereby indicating stress and possible 
failure in the future. Total cost to end of fiscal year 
were $4,487,177 of which $2,298,702 was for new 
work $1,445,643 for maintenance and $742,832 for 
rehabilitation. 
24. PENTWATER HARBOR, MICH. 
Location. On east shore of Lake Michigan 146 miles 
northeasterly from Chicago, Ill., and 14 miles southerly 
from Ludington, Mich. (See Lake Survey Chart 77.) 
Existing project. Provides for widening old entrance 
channel to 150 feet between parallel piers and 
revetments, channel to extend from Lake Michigan to 
Pentwater Lake, with a depth of 16 feet. Piers and 
revetments are built of stone-filled timber cribs and 
piling and capped with concrete. The 200-foot extension 
to south pier portion of project is considered 
inactive. Estimated cost (1954) of this portion is $65,100. 
(See table 30-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. Several small privately owned 
wharves on west end of Pentwater Lake. The city and 
Michigan Waterways Commission jointly constructed 
a dock on northwest side of Pentwater Lake for public 
use. Facilities are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government forces cost $3,246. The U. S. 
bucket dredge Tompkins performed maintenance dredging 
in the project removing 48,060 cubic yards, scow 
measure, of shoal material at a cost of $72,437. 
Engineering and design, supervision and administration 
cost $15,366. 
Condition at end of fiscal year. Existing project was 
completed in 1959 except for a 200 foot extension to the 
south pier which is not considered necessary under 
present condition. For additional details see page 1468 
of Annual Report for 1962. A recent survey of the 
structures indicates severe deterioration of sections G, 
H and B of the south pier. 
25. POINT LOOKOUT HARBOR (AU 
GRES RIVER), MICH. 
Location. At Au Gres River on westerly shore of Lake 
Huron at entrance to Saginaw Bay, about 27 miles 
northeast of mouth of Saginaw River. (See Lake 
Survey Chart 52.) 
Existing project. Provides for construction of a small 
boat harbor having a 12-foot deep, 100-foot wide, 2, 
800-foot long outer entrance channel; a 4,000-foot 
long, 100-foot wide inner entrance channel having a 
10-foot depth in the downstream 2,000-foot section and 
a 8-foot depth in the upstream 2,000-foot section; a 10, 
000-foot long 8-foot deep river channel ending just 
downstream from U. S. 23 highway bridge and having 
a width of 100 feet in the lower half and 80 feet in the 
upper half; a 4,000-foot long north breakwater and a 3, 
800-foot long south breakwater. Estimated (1970) cost 
for new work is $2,450,000 excluding $104,500 to be 
908

DETROIT, MICH., DISTRICT 
contributed by local interests. Total non-Federal cost 
(1970) is $325,000. (See table 30-B for authorizing 
legislation.) 
Local cooperation. Improvement authorized by the Act 
of March 2, 1945, is subject to the condition that 
responsible local agencies give assurances they will 
contribute $104,500 in cash toward first cost of 
protective structures and dredging; provide and 
maintain a suitable and adequate public wharf for the 
accomodation of transient vessels; establish a competent 
and properly constituted public body empowered 
to regulate the use, growth, and free development 
of harbor facilities, with the understanding 
that harbor facilities shall be open to all on equal and 
reasonable terms; hold the United States free from 
damages due to construction and maintenance of the 
works; provide lands, easements, and rights-of-way for 
construction of the project, including suitable spoil 
disposal areas when and as required. Assurances were 
furnished by Michigan State Waterways Commission 
and approved by Assistant Secretary of the Army on 
March 22, 1948. 
Terminal facilities. Private small boat development 
being planned. State of Michigan will construct 
marina facilities. 
Operations and results during fiscal year. New work: 
Preconstruction planning for dredging the river and 
channels and construction of breakwaters was completed 
at a cost of $50,929. A contract for construction 
of the navigation facilities and structures was awarded 
on 30 June 1970 in the amount of $2,168,880. 
Condition at end of fiscal year. Construction will be 
initiated during FY 1971. 
26. PORT CLINTON HARBOR, OHIO 
Location. Comprises lower half-mile of Portage River. 
River empties into Lake Erie 72 miles westerly from 
Cleveland, Ohio. (See U. S. Lake Survey Chart 3). 
Existing project. Provides for parallel jetties at river 
mouth and a channel in Lake Erie and Portage River 
with a project depth of 10 feet. For additional details 
see page 1899 of Annual Report for 1951. (See table 
30-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. There is one public fish dock, one 
private sand dock, one private fuel, lumber and coal 
dock, and five additional private docks. A dock at foot 
of Madison Avenue is owned by village of Port Clinton 
and open to the public. A shipyard builds small boats. 
Terminal facilities are adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government forces cost $3,288. Adjustment of 
costs in prior years dredging by Chicago plant was 
-$929. Engineering and design, layouts, supervision 
and administration for prior years work cost $135. 
Condition at end of fiscal year. Existing project was 
completed in 1893. For additional details on completion 
of existing project see page 1900 of Annual 
Report for 1951. Total costs of existing project to end of 
fiscal year were $304,746 regular funds, of which $71, 
950 was for new work and maintenance prior to 1894 
(not separable) and $232,796 for maintenance since 
1894. 
27. PORT SANILAC HARBOR, MICH. 
Location. On southwest shore of Lake Huron, 30 miles 
north of Port Huron, Mich. (See Lake Survey Chart 
51). 
Existing project. Provides for a harbor of refuge 
protected by breakwater structures extending to 12- 
foot depth contour in lake; for dredging a harbor basin 
10 feet deep; for dredging an entrance channel 12 feet 
deep; a 70-foot extension of the south breakwater; a 
300-foot arm added to the north breakwater; and 
riprap placed at the lakeward side of the breakwater 
additions. (See table 30-B for authorizing legislation). 
Local cooperation. Fully complied with for completed 
portions of project. For breakwater extensions responsible 
local interests must furnish assurances that 
they will contribute in cash 50 percent of the first cost 
for construction of the recommended improvement, 
exclusive of aids to navigation, if the first cost is less 
than $1,000,000. If the first cost exceeds $1,000,000 
contribute the amount in excess of $500,000 of this first 
cost. The contribution is presently estimated to be 
$133,200. The required amount shall be paid in a lump 
sum prior to initiation of construction, the final 
apportionment of cost to be made after actual costs 
have been determined; provide without cost to the 
United States all necessary lands, easements, and 
rights-of-way for construction and subsequent maintenance 
of the project and for aids to navigation upon 
the request of the Chief of Engineers; hold and save the 
United States free from all claims for damages incident 
to the construction, operation, and maintenance of the 
improvement; provide and maintain without cost to 
the United States any additional mooring facilities, 
services areas, public landing with suitable supply 
facilities, a launching ramp, reservation of space for 
transient craft, parking areas with adequate sanitary 
facilities, and access roads, open to all on equal terms; 
the dredging of berthing areas to be commensurate 
with the depth of the Federal basin improvements; 
establish regulations prohibiting discharge of pollutants 
into the waters of the harbor by users thereof, 
which regulations shall be in accordance with applicable 
laws or regulations of Federal, State, and local 
authorities responsible for pollution prevention and 
control; provided, however, that if there are no 
applicable State or Federal laws or regulations, local 
interest shall provide adequate waste disposal facilities 
for all watercraft and other users. 
)9 
451-584 0-72-58

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Terminal facilities. There is one privately owned dock 
used principally as a fishing terminal by owner and a 
municipally owned pier for recreational craft. Facilities 
are considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Preconstruction planning was initiated for the latest 
project modification at a cost of $4,487. Maintenance: 
Miscellaneous inspection services and condition surveys 
were conducted. 
Condition at end of fiscal year. Project was completed in 
1951 except for latest project modification which has 
not been started. Breakwaters are in good condition. 
28. ROUGE RIVER, MICH. 
Location. Rises in Oakland and Wastenaw Counties, 
Mich., 30 miles long, flows southeasterly through 
Wayne County, and joins Detroit River at westerly 
limit of city of Detroit. (See Lake Survey Chart 415.) 
Previous projects. For details see page 1530 of Annual 
Report for 1932, and page 1558 of Annual Report for 
1938. 
Existing project. Provides for: (a) Main channel from 
Detroit River through Short Cut Canal extending to 
upstream limit of the project, a distance of 3.5 miles. 
Project depths are 25 and 21 feet in navigation 
channel, 21 feet in turning basin, and 13 feet in upper 
reach of project. (b) Old channel from Detroit River 
extending to junction of Old Channel with Short Cut 
Canal. Project depths are 25, 18, 17, and 21 feet. For 
additional details see page 1324 of Annual Report for 
1963. Estimated Federal cost (1969) for new work is 
$560,000 exclusive of amounts expended on previous 
projects. Estimated non-Federal cost (1969) is $90,000. 
Except for dredging 25-foot channel 1,150 feet upstream 
from mouth of Old Channel, work authorized 
in act of August 30, 1935, is considered inactive and 
excluded from foregoing cost estimate. Estimated cost 
(1958) of inactive portion is $255,000. It has been 
recommended that work authorized by act of July 3, 
1958, be placed in deferred for restudy category. (See 
table 30-B for authorizing legislation.) 
Local cooperation. Act of August 30, 1935, provided 
that no Federal expenditures be made on improvements 
in old channel until local interests provided 
all necessary rights-of-way and furnished guarantees 
protecting the United States against damages to 
adjacent lands and property which may result from 
dredging operations. Except for guarantees protecting 
the United States against damages to adjacent lands 
and property along 25-foot channel, this requirement 
has not been complied with. Act of July 3, 1958, is 
subject to condition that local interests furnish lands, 
rights-of-way, and spoil disposal areas for construction 
and future maintenance; hold the United States free 
from damages; make a cash contribution equal to 50 
percent of first cost of dredging; dredge and maintain 
area between Federal channel and wharves along 
channel to depth necessary for mooring vessels; and 
provide and maintain a steel sheet pile bulkhead to 
protect facilities of Allied Chemical and Dye Corp. 
Except for guarantees p rotecting the United States 
against damages to adjacent lands and property along 
25-foot channel, this requirement has not been 
complied with. Act of October 23, 1962, requires local 
interests to provide lands and rights-of-way for construction 
upon request of the Chief of Engineers; hold 
the United States free from damages; provide terminal 
facilities to accomodate prospective commerce considered 
in report of District Engineer; dredge and 
maintain areas between the Federal improvement and 
terminal facilities to depths commensurate with improved 
Federal channel; make alterations in docks, 
bulkheads, and other structures, and take such other 
measures as may be necessary to assure stability of 
banks adjacent to channel; and provide bridge 
protection. The assurances of local cooperation for the 
River and Harbor Act of 1962 were furnished by the 
Michigan State Waterways Commission and accepted 
on January 7, 1965. Fulfillment of all items of local 
cooperation has not been accomplished. 
Terminal facilities. Numerous large commercial docks 
for handling various type cargo. Details on actual port 
and harbor facilities are contained in the Port Series 
No. 45 (revised 1961) prepared and published as Part 2 
by the Board of Engineers for Rivers and Harbors. 
Information on port administration and Federal 
services, port and terminal services and charges, and 
steamship services is prepared and published as Part 1 
by the Port Development Staff, U. S. Department of 
Commerce. Facilities are considered adequate for 
existing commerce. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government forces cost $24,773 U. S. hopper 
dredge Hains performed maintenance dredging removing 
136,063 cubic yards, bin measure, of shoal 
material at a cost of $117,266. Adjustments in the 
amount of -$22,670 and -$1,904 were made in prior 
year cost of hopper dredging by the U. S. hopper 
dredge Hoffman and supervision and administration, 
respectively. The cost is exclusive of financial participation 
in cost of dredging by industries (obtained as 
a result of studies on illegal deposit of industrial waste) 
in the following amounts: Ford Motor Company $84, 
554; Peerless Cement Company $6,412. Maintenance 
and repairs of Rouge River disposal area using the U. 
S. derrickboat Michigan cost $54,633. A contract for 
construction of a disposal area dike on Grassy Island 
was initiated during the fiscal year at a cost of $918, 
695. Study and report of dredge spoil disposal methods 
under the Great Lakes Pilot Program cost $139. 
Engineering, design, supervision and administration 
cost $97,385. 
Condition at end of fiscal year. Work authorized before 
1962 modification is completed except for deepening 
old channel to 21 feet from Detroit, Toledo & Ironton 
Railroad bridge to a junction with Short Cut Canal. 
910

DETROIT, MICH., DISTRICT 
This work is being held in abeyance until local interests 
comply with terms of local cooperation. Engineering 
and design on modifications authorized by 1962 River 
and Harbor Act has been deferred pending fulfillment 
of local cooperation requirements. For additional 
details on completion of existing project see Annual 
Report for 1962. Total costs for existing project to end 
of fiscal year were $6,519,802 of which $595,605 was for 
new work and $5,924,197 for maintenance. In addition 
$29,563 was expended for new work from Emergency 
Relief Act Funds. 
29. SAGINAW RIVER, MICH. 
Location. Formed by union of Tittabawassee and 
Shiawassee Rivers, 22 miles long, and flows northerly 
into extreme inner end of Saginaw Bay, Lake Huron. 
Cities of Saginaw and Bay City are on the river. (See 
Lake Survey Chart 524.) 
Previous projects. For details, see page 1957 of Annual 
Report for 1915, and page 1550 of Annual Report for 
1938. 
Existing project. Provides for an entrance channel 27 
feet deep and 350 feet wide from 27-foot contour in 
Saginaw Bay to river mouth; thence a channel 26 feet 
deep and 200 feet wide for about 0.4 mile; thence 25 
feet deep and 200 feet wide to New York Central 
Railroad bridge at Bay City; thence 22 feet deep and 
200 feet wide to C&O Railroad Bridge in Saginaw; 
thence 16.5 feet deep and 200 feet wide to upstream 
limit at Green Point. Project also provides for five 
turning basins; one 25 feet deep at Essexville, 600 feet 
wide with a maximum length of 1,850 feet; one 22 feet 
deep on east side of channel about 1 mile upstream 
from Cass Avenue in Bay City, 650 feet wide and 1,000 
feet long; one 20 feet deep at Carrollton, 100 to 300 feet 
wide and 900 feet long; one 20 feet deep just 
downstream from C&O Bridge in Saginaw, 650 feet 
wide and 1,000 feet long; and one 15 feet deep between 
Bristol Street Bridge and New York Central Railroad 
bridge in Saginaw. (See table 30-B for authorizing 
legislation). 
Local cooperation. Fully complied with. 
Terminal facilities. Numerous large commercial docks 
for handling a great variety of cargo. Details on actual 
port and harbor facilities are in Port Series No. 45 
(revised 1961) prepared and published as part 2 by 
Board of Engineers for Rivers and Harbors. Information 
on port administration and Federal services, 
port and terminal services and charges, and steamship 
services is prepared and published as part I by Port 
Development Staff, U. S. Department of Commerce. 
Facilities are considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Preconstruction planning was completed for the 
improvements authorized by the 1962 Act for the 
channel portion from Sixth Street to the C&O 
Railroad Bridge and the Sixth Street turning basin, 
(section D-2) at a cost of $21,251. The contract for 
section D-2 was awarded on July 31, 1969 and 
completed in June 1970 at a cost of $410,607. A 
hydraulic dredge was used, removing 355,604 cubic 
yards of material, place measure. An adjustment of 
-$37,590 for prior year costs was made on the contract 
for dredging of section "A" of outer bay (1962 
Modification), completed in November 1968. The 
contract awarded in fiscal year 1968 for dredging 
section "B" of inner bay (1962 Modification) was 
completed at a cost of $530,282. A hydraulic dredge 
was used, removing 203,154 cubic yards of material, 
place measure. Surveys, construction layouts, supervision 
and administration costs in connection with 
1962 modifications were $58,989. Contractors reimbursable 
expenditures for 1962 modifications for work 
performed in 1969 were $791,376. Maintenance: 
Miscellaneous inspections and condition surveys were 
accomplished using Government plant and forces at a 
cost of $57,266. The U. S. hopper dredge Lyman and U. 
S. bucket dredge Tompkins performed maintenance 
dredging removing 201,134 cubic yards, bin measure, 
and 29,050 cubic yards, scow measure, of shoal 
material at cost of $166,409, and $68,170 respectively. 
An adjustment in the amount of $5,775 was made in 
prior year dredging cost performed by the U. S. hopper 
dredge Markham. Preliminary designs and estimates of 
cost for development of a maintenance disposal area on 
the Dow Chemical Company property near the mouth 
of the Saginaw River and continued studies of spoil 
disposal methods were accomplished under the Great 
Lakes Pilot Program at a cost of $2,665. Engineering, 
design, supervision and administration cost $41,371. 
Condition at end of fiscal year. Existing project is 
complete except for a small part of the work authorized 
by the Act of October 23, 1962. Section D (Sixth Street 
Turning Basin), 1962 Act is complete except for the 
channel portion for which a modification is pending. 
Total costs for existing project to the end of the fiscal 
year were $18,655,027 of which $13,946,442 was for 
new work and $4,708,585 was for maintenance. 
30. ST. CLAIR RIVER, MICH. 
Location. A section of Great Lakes connecting 
channels, about 40 miles long and flows southerly from 
Lake Huron into Lake St. Clair. (See Lake Survey 
Chart 43.) 
Existing project. Provides for channels through St. 
Clair River, which, at low water datum, are suitable for 
vessels drawing 25.5 feet. Project also provides for 
compensating works, consisting of a number (estimated 
at 31) of submerged rock sills, with crests 31 feet below 
datum, and improvement of North Channel outlet, 100 
feet wide and 10 feet deep, for recreational craft. 
Project depths are referred to low water datums for 
Lakes Huron and St. Clair, 576.8 and 571.7 feet above 
mean water level at Father Point, Quebec 
(International Great Lakes Datum 1955.) (See tables 
911

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
30-B and 30-C for authorizing 'legislation and 
features of existing project.) 
Act of March 21, 1956, provides for a project safe 
draft of 25.5 feet over full width of channels when levels 
of Lakes Huron and St. Clair are at their respective low 
water datums. Estimated cost (1970) for new work is 
$27,289,000. Project features for construction of compensating 
works, consisting of submerged rock sills, was 
previously considered inactive. During fiscal year 1960, 
portion of rock sills (presently estimated at four) 
necessary to compensate for deepening connecting 
channels was reclassified in active category. Estimated 
cost (1970) for these four sills is $7,170,000. This cost is 
included in foregoing estimated cost of new work. No 
expense of maintenance will probably be required for 
submerged sills. 
Local cooperation. None required. 
Terminal facilities. This improvement serves through 
commerce between upper and lower Great Lakes, and 
has not materially influenced terminal facilities along 
its route. A number of privately owned piers and 
wharves are at Port Huron, Marysville, St. Clair, and 
Marine City, Mich., which handle coal, limestone, 
petroleum products, woodpulp, salt and general cargo. 
These installations satisfy present commerce requirements. 
Operations and results during fiscal year. New work: 
Preliminary studies were made to determine required 
channel modifications to accommodate larger Great 
Lakes vessels now under construction and minor design 
studies for compensating works were continued with 
substantial completion of model study for the compensating 
works at a cost of $6,223. Maintenance: 
Preliminary studies and field investigations for development 
of a maintenance dredging spoil disposal 
area near Gull Island in Lake St. Clair were initiated. 
Miscellaneous inspection services, preparation and 
publication of connecting channels depth bulletins, 
and surveys by Government force cost $69,818. The U. 
S. hopper dredge Hains removed 129,221 cubic yards, 
bin measure, of shoal material at a cost of $86,990. 
Obstructions were located at a cost of $47,833 and 
removed by derrickboat Huron at a cost of $231,185. 
Engineering, design, supervision and administration 
cost $76,705. 
Condition at end of fiscal year. Existing project is 
complete except for construction of submerged rock 
sills and improving North Channel Outlet. 
31. ST. JOSEPH HARBOR, MICH. 
Location. On east shore of Lake Michigan, 60 miles 
easterly from Chicago, Ill., and 24 miles southerly from 
South Haven, Mich. (See Lake Survey Chart 758.) 
Previous projects. For details see page 1945 of Annual 
Report for 1915, and page 1470 of Annual Report for 
1938. 
Existing project. Provides for protecting mouth of St. 
Joseph River by two piers, 250 to 325 feet apart at their 
inner and outer ends, respectively, having lengths of 2, 
758 feet on north side and 2,603 feet on south side; for a 
channel 21 feet deep from Lake Michigan to mouth of 
Benton Harbor Canal, a length of about 6,900 feet with 
widths of 265 feet at outer end of piers, 190 feet at inner 
end of piers and revetments, thence generally 215 feet 
to lower end of turning basin, increasing to 250 feet 
above the turning basin to mouth of Paw Paw River, 
thence generally 110 feet in Paw Paw River to mouth 
of Benton Harbor Canal; for dredging channel in 
Benton Harbor Canal up to west line of Riverview 
Drive extended northerly, to 18 feet deep and 80 feet 
wide; and a turning basin 18 feet deep on north side of 
channel above mouth of Morrison Channel and a 
turning basin 18 feet deep near mouth of Paw Paw 
River. Public Law 88-88th Congress declared a portion 
of Benton Harbor Canal a nonnavigable stream. (See 
table 30-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Several commercial wharves for 
handling coal, building materials, petroleum products, 
and miscellaneous commodities. A package freight 
terminal is also available. Facilities considered adequate 
for existing commerce. 
Operations and results during fiscal year. Rehabilitation: 
A contract for rehabilitation of the south pier and south 
revetment was awarded on 25 June 1970 in the amount 
of $545,177. Maintenance: Miscellaneous inspection 
and condition surveys by Government forces cost $13, 
338. U. S. hopper dredge Hains performed maintenance 
dredging by removing 46,483 cubic yards bin 
measure of shoal material at a cost of $37,539. An 
adjustment in the amount of $3,221 was made in prior 
year dredging cost performed by the U. S. bucket 
dredge Tompkins Preconstruction planning for major 
rehabilitation of south pier (sections F and G) and 
south revetment (sections D and L) was completed at a 
cost of $4,988. Preconstruction planning for development 
of a diked disposal area was initiated under 
the Great Lakes Pilot Program at a cost of $14,759. 
Engineering, design, real estate services, supervision 
and administration cost $11,900. 
Condition at end of fiscal year. Existing project was 
completed in 1956. The structures are in generally 
good condition except for 601 feet of section F and 376 
feet of section G of south pier and 35 feet of section K 
and 178 feet of section L of the south revetment which 
is scheduled for repair during fiscal year 1971. For 
additional details on completion of existing project see 
page 1454 of Annual Report for 1962. Total costs of 
existing project to end of fiscal year were $3,842,956 of 
which $473,371 was for new work $3,004,268 for 
maintenance and $365,317 for rehabilitation. 
32. ST. MARYS RIVER, MICH. 
Location. A Great Lakes connecting channel about 63 
miles long, flows south- easterly between State of 
Michigan and Province of Ontario, Canada, from 
912

DETROIT, MICH., DISTRICT 
eastern end of Lake Superior into northern end of Lake 
Huron. (See Lake Survey Charts 61, 62, and 63.) At 
Sault Ste. Marie, Mich., about 14 miles downstream 
from Lake Superior, there are four parallel locks and a 
hydroelectric powerplant. 
Previous projects. For details see page 1955, Annual 
Report for 1915; and page 1529, Annual Report for 
1938. 
Existing project. Channels permitting 25.5-foot draft 
navigation in St. Marys River and Lake Superior and 
Lake Huron approaches thereto; constructing and 
operating four locks and two canals; constructing a 
hydroelectric plant of 14,000 kilowatt capacity (45,000 
kilowatt ultimate capacity) constructing anchorage 
areas in river above and below locks; and constructing 
various other works in conjunction with project. 
Original State locks were operated and maintained 
under permanent indefinite appropriation from June 
9, 1881, to November 2, 1886, after which they were 
destroyed by excavation for the Poe Lock in 1896. 
Weitzel Lock, destroyed in 1942 by excavation for 
MacArthur Lock, was operated and maintained under 
the same appropriation from September 1, 1881, to 
June 30, 1935. Poe Lock was operated and maintained 
under the same appropriateion from August 3, 1896, 
Davis Lock from October 21, 1914, and Sabin Lock 
from September 18, 1919, to end of fiscal year 1935. 
Poe Lock was destroyed by excavation for new Poe 
Lock in 1962. Details of existing project are set forth in 
table 30-D. 
Project depths are referred to low water datum 
corresponding to sloping surface of river as follows: 
Above locks: When water surface of Lake Superior is at 
elevation 600 feet and at upstream side of locks is 599.5 
feet above mean water level at Father Point, Quebec 
(International Great Lakes Datum 1955). Below locks: 
When water surface at downstream side of locks is at 
elevation 577.8 feet and Lake Huron is 576.8 feet above 
mean water level at Father Point, Quebec 
(International Great Lakes Datum 1955). Estimated 
(1970) cost for new work is $160,511,000 exclusive of 
amounts expended on previous projects and includes 
$3,410,600 for construction of new lift bridge which 
was completed in 1960 under separate cover. (See table 
30-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. This improvement serves through 
commerce between Lake Superior and lower lakes and 
has not materially influenced terminal facilities at 
localities along its route. Three piers at Sault Ste. 
Marie receive coal and petroleum products. Limestone 
is shipped from a pier at Drummond Island. Vessel 
refueling stations are at Lime Island and village of 
Detour; they receive coal and petroleum products. 
Present terminals satisfy current traffic requirements. 
Operations and results during fiscal year. New Work: 
Investigation of critical bends in the River, to determine 
the extent to which these bends require 
widening and deepening to accomodate the larger 
Great Lakes vessels now under construction, was 
continued. Quantity surveys and subsurface materials 
investigations were completed for contract No. 2, 
which includes Angle 5 and 6, Angle 7 and 8, and 
Angle 9 and 10 of the Middle Neebish Channel. 
Surveys were completed over proposed disposal areas to 
be used during dredging of contract No. 1 at Johnson's 
Point, Middle Neebish Channel. Engineering and 
design cost for the year was $74,452. New Poe Lock: 
The contract for construction of new Poe Lock was 
completed at a cost of $6,757. The contract for 
furnishing and installing power, control, and lighting 
equipment for new Poe Lock was completed at a cost of 
$9,750. Surveys, construction layouts, supervision and 
administration cost $23,971. Hired Labor: Instrumentation 
and observation for measuring rock 
movements was completed at a cost of $1,901. Surveys, 
construction layouts, supervision and administration 
on hired labor cost $466. The new Poe Lock was 
dedicated and placed in regular operation on 26 June 
1969. Maintenance: Operation and care-Locks: Two 
canals and four locks were operated as required, and 
necessary repairs and improvements were made thereto 
and to appurtenant structures and equipment. Canal 
was open to navigation 281 days from 1 July 1969 
through 4 January 1970 and from 30 March 1970 
through 30 June 1970. During that period, a total of 18, 
776 vessels, aggregating 112,375,008 short tons of 
freight and 425,868 passengers, passed through the 
MacArthur, Poe, Davis and Sabin Locks. Cost for fiscal 
year was $2,149,611, all hired labor. Powerhouse and 
equipment: Two hydroelectric powerhouses were 
operated and maintained. Costs during fiscal year were 
$188,714 for hired labor, less a deduction of $13,435 for 
interdepartmental electricity sold. Purchase and installation 
of an additional electric transmission cable 
was initiated at a cost of $43,312. Other operation care 
items: Buildings and grounds were maintained; security 
measures enforced; and condition and operation 
studies, inspections, and reports made or compiled as 
required, all by hired labor. Cost was $440,670. 
Channels and Canals: St. Marys River Channels and 
canal approaches were examined by sweeping. Removal 
of shoals in St. Marys River Channels and canal 
approaches was accomplished by hired labor and U. S. 
derrickboats Merganser. and Harvey, at a cost of $372, 
791. The U. S. hopper dredge Hams performed 
maintenance dredging in the project removing 29,159 
cubic yards, bin measure, shoal material at a cost of 
$25,734. Recreational facilities: Information center, 
comfort stations, park fountain, observation and 
overlook platforms were operated and maintained, 
including a contract for producing a new film on the 
locks, at a cost of $62,848. Engineering and design and 
miscellaneous work on recreational facility improvements 
were performed by hired labor at a cost of 
$17,844. A total of 777,573 visitors used the observation 
913

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
and overlook platform and the information center 
facilities during the fiscal year. 
Condition at end of fiscal year. Project in effect prior to 
modification of March 21, 1956, is complete with 
exception of installation of steel guard gates at upper 
end of MacArthur Lock. Work authorized by 1956 
modification to provide a safe draft of 25.5 feet for both 
upbound and downbound traffic is complete except for 
construction of anchorage area in vicinity of Point 
Iroquois. Point Iroquois anchorage area is approximately 
91 percent complete. The cost of existing 
project to June 30, 1970 was: Regular Funds-$147, 
288,724 for new work and $58,811,161 for maintenance, 
totaling $206,099,885; Public Work 
Funds-$158,401 for new work; and Public Works 
Acceleration Funds-$118,000 for maintenance. The 
total for new work and maintenance being $147,447,125 
and $58,929,161, respectively, for a grand total of $206, 
376,286. 
33. SAUGATUCK HARBOR AND 
KALAMAZOO RIVER, MICH. 
Location. Harbor is on east shore of Lake Michigan, 
90 miles northeasterly from Chicago, Ill., and 22 miles 
northerly from South Haven, Mich. (See Lake Survey 
Chart 76.) 
Previous projects. For details see page 1947 of Annual 
Report for 1915, and page 1475 of Annual Report for 
1938. 
Existing project. Entrance channel protected by 
parallel piers at mouth of Kalamazoo River and a river 
channel to city of Saugatuck. Project depths: 16 feet in 
entrance channel, 14 feet in river channel. Additional 
details on page 1456, 1962 Annual Report. (See table 
30-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. At village of Saugatuck there are 
several landing places for recreational craft and one for 
small commercial vessels. At village of Douglas there is 
a landing pier. Facilities are considered adequate for 
present traffic. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government forces cost $3,283. U. S. hopper 
dredge Hains and U. S. bucket dredge Tompkins 
performed maintenance dredging in the project removing 
79,512 cubic yards, bin measure, and 17,550 
cubic yards, scow measure, of shoal material, respectively, 
at a cost of $83,048. Chicago District's Plant 
placed stone fill along revetments at a cost of $2,587. 
Engineering, design, supervision and administration 
cost $15,544. 
Condition at end of fiscal year. Existing project was 
completed in 1911. Piers and revetments are in 
generally good condition. Total cost for existing project 
to end of fiscal year were $1,767,931 of which $274,295 
was for new work and $1,493,636 for maintenance. 
34. SOUTH HAVEN HARBOR, MICH. 
Location. On east shore of Lake Michigan, 77 miles 
northeasterly from Chicago, Ill., and 24 miles northerly 
from St. Joseph, Mich. (See Lake Survey Chart 76.) 
Previous projects. For details see page 1947 of Annual 
Report for 1915, and page 1473 of Annual Report for 
1938. 
Existing project. An entrance channel protected by 
parallel piers and revetments at mouth of Black River, 
a river channel, and a turning basin. Project depths are 
21 feet in entrance channel and 19 feet in river channel 
and turning basin. For additional details see page 1455 
of Annual Report for 1962. (See Table 30-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Several wharves for handling coal, 
building materials, woodpulp, fish, and miscellaneous 
commodities; two have warehouses. Facilities satisfy 
current commerce requirements. 
Operations and results during fiscal year. Rehabilitation: 
A contract for rehabilitation of revetments was 
awarded on 30 June 1970 in the amount of $654,825. 
Maintenance: Miscellaneous inspection services and 
condition surveys were accomplished at a cost of $5, 
941. The U. S. hopper dredge Hains and the U. S. 
bucket dredge Tompkins performed maintenance dredging 
removing 38,802 cubic yards, bin measure, and 11, 
850 cubic yards, scow measure, respectively, of shoal 
material at a cost of $59,561. Preconstruction planning 
for major rehabilitation of the north revetment (section 
F and G), south pier (section H) and south revetment 
(section L) was completed at a cost $46,707. Structure 
fill stone was placed on the piers and revetments during 
the fiscal year by the Chicago District's plant and 
forces at a cost of $10,084. Engineering and design 
(including prior to dredging surveys) and supervision 
and administration cost $12,893. 
Condition at end of fiscal year. Existing project was 
completed in 1960. For additional details on completion 
of existing project see page 1456 of Annual 
Report for 1962. Piers and revetments are in good 
condition except for those structures scheduled for 
rehabilitation. Total costs for existing project to the end 
of fiscal year were $3,054,818 of which $265,193 was for 
new work, $1,909,855 for maintenance, and $879,770 
for rehabilitation. 
35. TOLEDO HARBOR, OHIO 
Location. Comprises lower 7 miles of Maumee River 
and channel through Maumee Bay to Lake Erie. 
Maumee River has it s source in northern Indiana and 
empties into Lake Erie. Harbor is at westerly end of 
Lake Erie, 99 miles westerly from Cleveland, Ohio. 
(See Lake Survey Chart 374.) 
Previous projects. For details see page 1959 of Annual 
Report for 1915, and page 1565 of Annual Report for 
1938. 
914

DETROIT, MICH., DISTRICT 
Existing project. A channel 28 feet deep and 500 feet 
wide from deep water in Lake Erie about 18 miles to 
mouth of Maumee River; including a widening of 38.6 
acres opposite Chesapeake & Ohio Railway and 
Lakefront Terminal Co. docks; a channel in the river 
27 feet deep and 400 feet wide from mile 0 (river 
mouth) to 3; thence a channel 400 feet wide from mile 
3 to 6.5 with depths of 27 feet over a least width of 200 
feet and 25 feet over remaining 400-foot channel 
width; thence a channel 25 feet deep and 200 feet wide 
to upper limit of project, mile 7; for a turning basin 
opposite American Shipbuilding Co. docks (mile 2.7) 
750 feet wide, 800 feet long, and 20 feet deep; a turning 
basin just upstream of old Fassett Street Bridge (mile 
6.5) generally semicircular in shape with a radius of 
730 feet, and 27 feet deep; and a turning basin 18 feet 
deep and 8.25 acres in area at upper project limit. 
Project also provides for clearing sailing course 
between Maumee Bay Channel and East Outer 
Channel, Detroit River, to 28 feet deep over a width of 
1,200 feet. (See Table 30-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Maumee River through city of 
Toledo has been developed extensively for deep-draft 
navigation. Detailed information on actual port and 
harbor facilities are in Port Series No. 45 (revised 1961) 
prepared and published as Part 2, by Board of 
Engineers for Rivers and Harbors. Information on port 
administration and Federal services, port and terminal 
services and charges, and steamship services is prepared 
and published as Part I by the Port Development 
Staff, U. S. Department of Commerce. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government forces cost $17,478. Cooperative 
stream gaging and Michigan State Grid System 
Conversion cost $9,416. Hopper dredge pipeline 
equipment and disposal areas were maintained at a 
cost of $39,565. The U. S. dredges Markham and 
Hoffman performed maintenance dredging in the 
project removing 732,494 and 189,168 cubic yards, bin 
measure, respectively, of shoal material at a cost of 
$714,269. A contract for construction of an earth dike 
in the Riverside Park was completed during fiscal year 
1970 at a cost of $202,759. A contract for placing a pile 
cluster at the Riverside Park Disposal Area was 
completed at a cost of $7,780. Studies and reports of 
dredge spoil disposal methods under the Great Lakes 
Pilot Program cost $136. The contract for construction 
of an earth dike disposal area (Penn 7) was awarded on 
25 June 1970 in the amount of $273,658. Engineering, 
design, supervision and administration cost $149,017. 
Condition at end of fiscal year. The existing project is 
complete. Total costs of existing project were $29,820, 
528 of which $26,130,528 was for regular funds. (new 
work and maintenance prior to 1903, not separable, 
$11,877,147 and maintenance since 1903, $14,253,381) 
and $3,690,000 public works funds for new work. 
36. WHITE LAKE HARBOR, MICH. 
Location. On east shore of Lake Michigan 120 miles 
northeasterly from Chicago, Ill., and 45 miles southerly 
from Ludington, Mich. (See Lake Survey Chart 768.) 
Existing project. Parallel piers, revetments, and a 
channel. Channel is 16 feet deep, 200 feet wide, 1,950 
feet long, and extends from Lake Michigan to White 
Lake. For additional details see page 1465 of Annual 
Report for 1962. (See Table 30-B for authorizing 
legislation.) 
Local cooperation. None required. 
Terminal facilities. A privately owned chemical shipping 
dock on north side of lake about 3 miles from 
inner end of revetted entrance channel. Across lake, at 
village of Whitehall, there are several installations 
serving light draft vessels. These terminals satisfy 
present recreational and commercial traffic requirements. 
Operations and results during fiscal year. Maintenance: 
Condition surveys and miscellaneous inspection services 
by Government forces cost $1,836. The U. S. 
hopper dredge Hains performed maintenance dredging 
in the project removing 54,309 cubic yards, bin 
measure, of shoal material at a cost of $38,110. 
Engineering and design, supervision and administration 
cost $7,016. 
Condition at end of fiscal year. Existing project was 
completed in 1908. The structures are in generally 
good condition except sections B, C, and D of the south 
pier. 
37. WHITEFISH POINT HARBOR, MICH. 
Location. On south shore of Lake Superior 40 miles 
northwesterly from Sault Ste. Marie, Mich., and 53 
miles easterly from Grand Marais, Mich. (See U. S. 
Lake Survey Chart No. 92.) 
Existing project. Provides for a harbor of refuge 
prot.cted by two breakwater structures and for 
dredging a harbor basin and entrance channel, 12 feet 
deep. The addition of a 270-foot wave absorbing 
breakwater inside the harbor was approved by the 
Chief of Engineers on August 17, 1967 to correct a 
design deficiency. (See Table 30-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There is one privately owned 
fishing wharf and a small-boat pier and launching 
ramp built by the State of Michigan. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. New Work: An 
adjustment of $130 was made in prior year cost of 
breakwater construction. Engineering, design, and 
supervision and administration cost $47. Maintenance: 
Condition surveys and miscellaneous services were 
915

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
performed by Government forces at a cost of $353. The 
U. S. bucket dredge Tompkins performed maintenance 
dredging, removing 3,900 cubic yards at a cost of $2, 
533. Engineering and design; construction layouts and 
surveys; supervision and administration cost $1,835. 
Condition at end of fiscal year. Existing project was 
completed in 1960. The interior breakwater and 
repairs to the shore connection were accomplished by 
contract during fiscal year 1969. Remaining structures 
are in generally good condition. 
38. RECONNAISANCE AND CONDITION 
SURVEYS 
See table 30-E. 
39. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 30-F. 
40. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to section 107, Public Law 86- 
645 (preauthorization). 
Studies conducted during fiscal year cost $4,619 for 
Detour Harbor, Michigan; $5,388 for Grindstone City, 
Michigan; $8,577 for Harbor Beach Harbor, Michigan; 
$4,301 for Harrisville Harbor, Michigan; $4,521 
for Huron River, Michigan; $2,500 for Middle 
Channel, Michigan; $13,129 for Platte River, Michigan; 
$666 for South Haven Harbor, Michigan; $935 
for Sterling State Park, Michigan; $5,614 for Toledo 
Harbor, Ohio. 
BEACH EROSION CONTROL 
41. AUTHORIZED BEACH EROSION 
CONTROL PROJECTS 
Beach Erosion Control Projects are authorized at 
Berrien County Shore (St. Joseph), Michigan and 
Crane Creek State Park, Ohio. For last full report see 
Annual Report for 1963 (Berrien County) and 1968 
(Crane Creek). 
FLOOD CONTROL 
42. GRAND RIVER AT LANSING, MICH. 
Location. This river rises in south-central Michigan 
and flows northerly to Lansing, thence northwesterly 
and westerly to Lake Michigan. Grand Haven, a 
federally improved deep-draft harbor is located at the 
mouth of the Grand River. The river drains an area of 
5,572 square miles. Lansing, the State capitol lies about 
150 miles upstream from the river mouth at the 
junction of the Grand and Red Cedar Rivers. (See U. 
S. Geological Survey Lansing quadrangle.) 
Existing project. This provides for flood protection at 
and in the vicinity of Lansing to consist generally of: 
Enlarging the channel of Red Cedar River from Upper 
College Dam in East Lansing to its mouth, a distance of 
about 5 miles; cleaning and straightening Sycamore 
Creek, a tributary of the Red Cedar River, within the 
city limits; constructing a 6-mile cutoff channel for the 
Grand River between Millett and Delta Mills, with 
appurtenant diversion dam and two drop structures; 
enlar ging the channel of Grand River from the mouth 
of the Red Cedar River downstream about 6 miles; 
making necessary changes in railroad crossings and 
alterations to substructures of highway bridges; and 
constructing necessary channel protection works. 
The estimated cost of new work, revised in 1970 is 
$19,700,000 excluding $590,000 to be contributed by 
local interests. The estimated cost to local interests, 
revised in 1970, is $6,160,000. (See Table 30-B for 
authorizing legislation.) 
Local cooperation. The act of July 3, 1958, provides that 
no money shall be expended by the United States until 
responsible local interests have given assurances 
satisfactory to the Secretary of the Army that they will: 
(a) Provide without cost to the United States all lands, 
easements, and rights-of-way necessary for the construction 
of the project; (b) hold and save the United 
States free from damages due to the construction 
works; (c) maintain and operate all the works after 
completion, including the maintenance and operation 
of the Moores Park and North Lansing Dams on 
Grand River at Lansing, in accordance with regulations 
prescribed by the Secretary of the Army; (d) 
prescribe and enforce regulations, satisfactory to the 
Secretary of the Army, designed to prevent encroachment 
on the rights-of-way and improved channels; 
(e) construct new highway bridges and highway 
grade channel crossings; (f) make all necessary changes 
and additions to streets, highway bridges and approaches, 
storm and sanitary sewers, waterlines, 
electric powerlines, and other miscellaneous utilities, 
and (g) contribute in cash 2.9 percent of the estimated 
first cost of work for which the United States would be 
responsible, a contribution presently estimated at $590, 
000. 
Operations and results during fiscal year. Preconstruction 
planning was continued but as a reduced rate pending 
completion of Grand River Basin Comprehensive 
Study. 
Condition at end of fiscal year. Construction of the 
project has not been started. 
43. KALAMAZOO RIVER, KALAMAZOO, 
MICH. 
Location. Rises in southern part of lower peninsula of 
Michigan, flows northwesterly 185 miles, and empties 
into Lake Michigan 2 miles downstream from village of 
Saugatuck. It drains an area of 1,980 square miles. City 
of Kalamazoo lies 75 miles upstream from mouth of 
river. (See Geological Survey Kalamazoo quadrangle.) 
916

DETROIT, MICH., DISTRICT 
Existing project. Provides for flood protection at and 
near Kalamazoo to consist generally of widening, 
deepening, and straightening the river channel from 
immediately above Comstock about 10 miles to near 
Cooper. Plan would include riprapping channel where 
necessary to prevent erosion at critical locations, 
reconstruction and reinforcement of railroad and 
highway bridges as required, and necessary alterations 
to existing buildings and utilities. Cost estimate for new 
work (1970) is $13,900,000 excluding $740,000 to be 
contributed by local interests. Estimate of cost to local 
interests (1970) is $1,870,000. (See Table 30-B for 
authorizing legislation.) 
Local cooperation. Act of July 3, 1958, provides that no 
money shall be expended by the United States until 
responsible local interests give assurances they will 
provide necessary lands, easements, and rights-of-way; 
hold the United States free from damages; maintain 
and operate all works after completion in accordance 
with regulations prescribed by the Secretary of the 
Army; prescribe and enforce regulations designed to 
prevent encroachments on rights-of-way and improved 
channels; raise all buildings and roadways in disposal 
areas as necessary to meet proposed grades; and make 
all utility changes necessitated by improvements; and 
provided further that Federal construction shall not be 
started until abatement of pollution of Kalamazoo 
River at and near Kalamazoo has been initiated by 
local interests to an extent satisfactory to the State of 
Michigan; and contribute in cash 5 percent of 
estimated first cost of work for which the United States 
would be responsible; a contribution presently estimated 
at $740,000. 
Operations and results during fiscal year. New work: 
Preconstruction planning for the project was continued. 
A general design memorandum was submitted 
in January 1970. An environmental supplement to the 
general design memorandum is being developed. 
Condition at end of fiscal year. Construction has not 
started. 
44. KAWKAWLIN RIVER, MICH. 
Location. River drains an irregularly shaped area of 
about 220 square miles in Bay, Gladwin, Midland, and 
Saginaw Counties in east-central Michigan and 
discharges into Saginaw Bay 2 miles northwest of 
Saginaw River. (See Geological Survey Bay City 
quadrangle and Lake Survey Chart 52.) 
Existing project. Provides for deepening about 1.8" 
miles of river channel between the river mouth and 
Euclid Street bridge; altering Detroit and Mackinac 
Railway bridge by addition of two 45.9-foot spans; 
protecting by riprap the channel bottom through 
Euclid Street bridge, existing piers at Henry Street 
bridge and Detroit and Mackinac Railway bridge and 
Detroit and Mackinac Railway bridge; and a number 
of utility relocations. Estimated (1970 Federal cost for 
new work is $1 million, excluding $220,200 to be 
contributed by local interests. Estimated (1970) total 
cost to local interests is $244,400 of which $14,000 
covers betterments to relocated water lines. (See Table 
30-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New Work: 
Preconstruction for prior year cost was adjusted in the 
amount of $1,330. The contract awarded in fiscal year 
1969 with the city of Bay City for relocation of their 
water lines was completed in June 1970 at a cost of 
$185,172. Construction was completed in June 1969 on 
the contract awarded in fiscal year 1968 for channel 
excavation, pier protection and erosion control at a cost 
of $2,397. A contract in the amount of $337,900 was 
awarded in July 1969 for the D&M Railroad bridge 
modification and alteration. Approximately 47 percent 
of the work was completed at a cost of $145,727. 
Surveys, construction layouts, supervision and administration 
cost $30,934. 
Condition at end offiscalyear. Construction was initiated 
in fiscal year 1969. Approximately 85 percent of the 
construction is completed. The remainder is scheduled 
for completion during fiscal year 1971. 
45. RIVER ROUGE, MICH. 
Location. River Rouge basin is in southeastern corner 
of lower peninsula of the State of Michigan, within 
Wayne, Oakland and Washtenaw Counties. Basin is 
fan shaped and extends about 24 miles from north to 
south and about 33 miles from east to west. Total area 
comprises about 464 square miles. (See Geological 
Survey, Detroit quadangle.) 
Existing project. Provides for flood protection along 
main stem of Rouge River from navigation turning 
basin to Michigan Avenue consisting of channel 
enlargement and straightening and alteration or 
replacement of existing bridges. Channel work includes 
deepening, widening, straightening, and paving existing 
river channel for about 30,300 feet along existing 
channel. Realigned channel will have a length of 22, 
100 feet. Channel depths under design discharge 
conditions vary from about 25 feet at navigation 
turning basin to about 20 feet at Michigan Avenue. 
Bridge work involves construction of one new railroad 
bridge and alteration of two railroad bridges at Federal 
expense and construction and alteration of highway 
bridges at local interest expense. Project is designed to 
provide protection for a peak-flood discharge of about 
24,000 cubic feet per second. Estimated (1970) Federal 
cost for new work is $29,500,000. Estimated (1970) cost 
to local interests is $9,000,000. Existing project was 
authorized by 1962 Flood Control Act (H. Doc. 148, 
87th Cong., 1st sess., contains latest published maps). 
Local cooperation. Responsible local interests must 
furnish areas necessary for construction; hold the 
United States free from damages; maintain and 
operate all works after completion; prescribe and 
enforce regulations designed to prevent encroachments 
917

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
on proposed rights-of-way and improved channel, and 
keep nonpile-supported bank loads a minimum distance 
of 50 feet from top of bank; construct new 
highway bridges as required; and make all alterations 
and additions to highway bridges, utility crossings, 
sewer outlets, and interfering structures within proposed 
channel rights-of-way. The required assurances, 
dated June 10, 1966, were furnished by the Wayne 
County Road Commission and accepted by the District 
Engineer on July 6, 1966. Local interests have 
constructed new bridges at Southfield Road and 
Rotunda Drive; altered and extended the Greenfield 
Road bridge; and have under construction the Michigan 
Avenue and Schaefer Road bridges. The Commission 
has also acquired all of the project right-of-way 
and local interests have completed approximately 20 
percent of the utility alterations. 
Operations and results during fiscal year. New work: 
Preparation of construction planning for the New York 
Central Main Line Railroad Bridge and channels in 
section B was continued at a cost of $134,384. 
Adjustments in the amount of $233,697 were made in 
the contract for construction of a two span extension to 
DT&I Railroad Bridge No. 0-12.73 over Rouge River 
in Allen Park and Dearborn, Michigan. The contract 
awarded in fiscal year 1968 for construction of New 
York Central Junction Yard Bridge was completed at a 
cost of -$221,231 A contract in the amount of $11,565, 
036 was awarded in May 1970 for construction of 
section "A". Costs for initiation of this work were $121, 
684. Surveys, supervision and administration cost $24, 
364. 
Condition at end of fiscal year. The contract for the two 
span extension of the DT&I Railroad Bridge was 
initiated in fiscal year 1968 and completed in fiscal 
year 1969. The construction of the New York Central 
Railroad Bridge was initiated in fiscal year 1968 and 
was completed in fiscal year 1970. The contract for 
construction of section "A" was awarded in May 1970 
and is scheduled for completion in fiscal year 1973. 
46. SAGINAW RIVER, MICH. 
Location. River including its tributaries, Tittabawassee, 
Shiawassee, Flint, and Cass Rivers, drains 
an area of 6,260 square miles in east-central Michigan 
and empties into Saginaw Bay, an arm of Lake Huron. 
Bay City, near mouth of river, and Saginaw, 22 miles 
upstream from mouth, are on federally improved deepdraft 
Saginaw River navigation channel. (See Geological 
Survey Saginaw and Flint quadrangles and 
Lake Survey Chart 524.) 
Existing project. Provides for improvements in S.ginaw 
River Basin for flood control and other purposes: 
(a) at Middle Branch and South Branch, Cass River, to 
provide for major drainage improvements by channel 
improvements on Middle and South Branches, including 
a short reach of East Branch, at an estimated 
U. S. cost (July 1961) for construction of $1,448,000 for 
Middle and South Branches; provided local interests 
contribute in cash 42 percent of first cost of major 
drainage project on Middle Branch, and 38 percent of 
first cost of major drainage project on South Branch, 
exclusive of cost of rights- of-way and other work 
required as local cooperation, and give assurances 
satisfactory to Secretary of the Army they will construct 
and maintain local drainage work required to fully and 
effectively utilize improvements to be provided under 
the Federal projects; (b) at Vassar on Cass River, to 
provide for flood protection of areas on north and south 
sides of river by channel improvement, levee construction, 
floodwalls, modification of Moore Drain, 
and related work, at an estimated U. S. cost (July 1961) 
for construction of $1,700,000; (c) at Frankenmuth on 
Cass River to provide for flood protection of areas on 
north side of river by channel improvement, levee 
construction, and related work, at an estimated U. S. 
cost (July 1970) for construction of $416,000; (d) at 
Flint on Flint River, to provide for flood protection of 
areas on both sides of main stem of Flint River and its 
tributaries, Swartz and Thread Creeks, by channel 
improvement, bridge alterations, floodwall and levee 
construction, and related work, at an estimated U. S. 
cost (July 1970) of $12,014,000 for construction; 
provided local interests contribute in cash 1 percent of 
first cost of project, exclusive of costs of rights-of-way 
and other work required as local cooperation; (e) at 
Corunna on Shiawassee River, to provide for flood 
protection by channel improvement, levee construction, 
and related work, at an estimated U. S. cost 
(July 1961) of $48,000 for construction; provided local 
interests modify spillway of mill dam at Corunna at 
their own expense, substantially in accordance with 
plan of District Engineer and subject to approval of 
Chief of Engineers, or, in lieu thereof, contribute to the 
United States actual cost of modification to be 
performed by the United States; (f) at Owosso on 
Shiawassee River, to provide for flood protection by 
channel improvement at an estimated U. S. cost (July 
1961) of $425,000 for construction; (g) at Midland on 
Tittabawassee River, to provide for flood protection by 
channel improvement, levee construction, and related 
work, at an estimated U. S. cost (July 1970) of $2,670, 
000 for construction; provided local interests contribute 
in cash 2 percent of first cost of project, exclusive of 
costs of rights-of-way and other work required as local 
cooperation; (h) at Shiawassee Flats along lower 
reaches of the four principal tributaries of Saginaw 
River, to provide for flood protection, including fish 
and wildlife areas, by channel improvement, levees, 
lateral reservoirs with control structures, and related 
work, at an estimated U. S. cost (July 1970) of $21,040, 
000 for new work, of which $18,200,000 is allocated to 
flood control and $2,840,000 to fish and wildlife 
purposes; provided local interests contribute in cash 5 
percent of portion of total first cost of project allocated 
to flood control, exclusive of cost of rights-of-way for 
flood control and other work required as local 
918

DETROIT. MICH., DISTRICT 
cooperation, and furnish one-half of land required for 
fish and wildlife areas provided that the Federal 
allocation for conservation does not exceed amount 
obtained by taking 28 percent of project cost for 
Shiawassee Flats unit and subtracting therefrom onehalf 
cost of lands for conservation; and provided 
further that before starting works for flood control to 
Shiawassee Flats, Chief of Engineers and Director, Fish 
and Wildlife Service, prepare a plan mutually acceptable 
to Secretary of the Army and Secretary of the 
Interior for operation of fish and wildlife areas to 
provide required degree of controlled storage of 
floodwaters while preserving the maximum fish and 
wildlife benefits. Total estimated cost for new work, for 
active portion (1970) is $33,300,000 excluding $2,840, 
000 Fish and Wildlife costs and $940,000 to be 
contributed by local interests. Total estimated cost 
(1970) to local interests, is $5,650,000. (See table 30-B 
for authorizing legislation.) 
Local cooperation. Responsible local interests must 
make cash contributions as called for above; furnish 
lands, and rights-of-way, including removal of buildings, 
for construction; hold the United States free from 
damage; maintain and operate all works after completion; 
establish and enforce regulations designed to 
prevent encroachments in improved channels; and 
bear expense of constructing highway relocations and 
highway bridges, alter bridge approaches and existing 
highway bridges (except underpinning and bridge 
raising), and alter utilities. Required assurances for 
Flint River at Flint were furnished by city of Flint and 
accepted by the United States November 23, 1962. 
Estimated required cash contribution for Flint ($56, 
000) was furnished February 20, 1963. Required 
assurances for Cass River at Frankenmuth were 
accepted on September 8, 1964. All necessary lands, 
easements, and rights-of-way have been provided. The 
Midland City Council and the Midland County Board 
of Supervisors have, by resolution, indicated their 
intent to enter into a joint contract to provide the 
assurances of local cooperation for the Midland Flood 
Control Project. 
Operations and results during fiscal year. New Work: 
Work in connection with Section A of the Flint River 
Flood Control Project, which was substantially completed 
in July 1967, was performed at a cost of $8,960. 
The contract for replacement of the Stevenson Street 
Bridge was substantially completed in June 1968. 
However, the actual removal of the old bridge is not 
required until 180 days after completion of the contract 
for Section B. The contract awarded in June 1968, for 
floodwalls, interior drainage, excavation and paving 
Chevrolet Dual Bridge Section B was initiated and is 
approximately 82 percent complete, at a cost of $950, 
242. Completion of Section B is tentatively scheduled 
for Fiscal Year 1971. At the request of local interests, 
construction of the upstream portion of Section C will 
be delayed and consequently the downstream portion 
of Section C will be constructed under the same 
contract with Section D. The downstream portion of 
Section C has been designated C-1 and the upstream 
portion C-2. The rescheduling will permit the redesign 
of C-2 to make it compatible with the plans of the city 
of Flint and the Department of Housing and Urban 
Development in the area. The city has engaged the 
services of an engineering firm to develop a preliminary 
plan for the flood control channel which will 
embrace both flood control criteria and urban renewal 
concepts. Three alternative plans will be developed by 
the engineering firm and included in a letter report for 
the redesign of C-2 to be completed in fiscal year 1971. 
Negotiations between the city and the Chesapeake and 
Ohio Railway Company to purchase the C&O bridge 
and approach trackwork in connection with the urban 
renewal program in Section C-2 are nearing completion. 
Negotiations leading to relocation agreements 
with the Grand Trunk Western Railroad, in Section C- 
1, and the Chesapeake and Ohio Railway in Section D, 
continued. Preparation of the scheduled feature design 
memorandum and efforts towards advertising federal 
project features in Sections C-1 and D continued for 
Flint. An 8,000 gpm standby pump will be provided in 
the existing project interior drainage pump station at 
Frankenmuth in fiscal year 1971. A $14,000 reimbursable 
contract was executed with the city of 
Frankenmuth for alteration of the pump facility by the 
city. Preconstruction planning costs for Flint, Frankenmuth, 
Midland, and Shiawasee Rivers were $160, 
021, $1,813, $59,320, and $16,696, respectively. Surveys, 
construction layouts, supervision and administration 
for Flint River Sections A and B cost $106, 
012. 
Condition at end of fiscal year. Construction at Frankenmuth 
was completed in 1967. Section A of the Flint 
project was completed in 1967 and the Stevenson Street 
Bridge was completed in 1968. Section B was initiated 
in 1968 and is scheduled for completion in fiscal year 
1971. In view of excessively high bidding, the Government 
plan for alteration of the Chevrolet spur track 
will be restudied and readvertised in fiscal year 1971. 
47. SEBEWAING, SEBEWAING RIVER, 
MICH. 
Location. Sebewaing River drains an area of 105 
square miles in Huron and Tuscola Counties on 
westerly side of Thumb area of Lower Peninsula of 
Michigan and discharges into Saginaw Bay, an arm of 
Lake Huron, 20 miles northeast from mouth of 
Saginaw River. Village of Sebewaing is near mouth of 
river. (See Lake Survey Chart 52.) 
Existing project. Enlarging present channel of Sebewaing 
River through village of Sebewaing, Mich., to 
a capacity of 7,500 cubic feet per second from junction 
of Columbia and State drains to a point 4,500 feet 
lakeward from railroad bridge near mouth; altering 
railroad bridge and three highway bridges to permit 
free passage of ice; and removal of present dike on 
919

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
south side of channel lakeward from railroad bridge. 
Project is designed to provide protection for village of 
Sebewaing from floods with a frequency of once in 15 
years and with a magnitude greater than the maximum 
flood of record. (See Table 30-B for authorizing 
legislation.) 
Local cooperation. Complied with except for furnishing 
easements and rights-of-way for removal of remaining 
portion of dike on south side of channel lakeward from 
railroad bridge. 
Operations and results during fiscal year. Maintenance: 
Cooperative stream gaging by Government forces cost 
$3,500. Annual removal of ice jams cost $1,201. 
Engineering, design, supervision and administration 
cost $848. 
Condition at end of fiscal year. Existing project was 
completed in 1948 for removal of remaining portion of 
old earth dike which is on the south side of the channel 
lakeward from railroad bridge. 
48. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
The listed projects were inspected during fiscal year 
1970: Battle Creek, Kalamazoo River, Michigan; 
Flint, Flint River, Michigan; Frankenmuth, Cass 
River, Michigan; Mt. Clemens Spillway & Cutoff 
Canal, Clinton River, Michigan; Red Run, Clinton 
River, Michigan; East Rockwood, Silver Creek, 
Michigan; Estral Beach, Lake Erie, Michigan; Reno 
Beach-Howard Farms, Lake Erie, Ohio; LaCarne- 
Camp Perry, Lake Erie, Ohio; Ft. Wayne Mechanic 
St. Pile, St. Marys River, Indiana; Burr Oak, Prairie 
River, Michigan. 
Fiscal Year Costs were $9,961. Total costs to end of 
fiscal year were $63,681. 
49. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 30-G. 
50. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 
858, 80th Congress, as amended (preauthorization) 
Studies conducted during the fiscal year cost $593 for 
Black Lake, Michigan, $3,116 for Rouge River, 
Birmingham, Michigan and $2,500 for Lake Ponemah, 
Genesee County, Michigan. 
Emergency flood control activities; repair, flood fighting, and 
rescue work (Public Law 99, 84th Cong., and antecedent 
legislation) 
Federal costs for fiscal year were $18,564 for advance 
preparation, $11,691 for emergency operations. 
GENERAL INVESTIGATIONS 
51. SURVEYS 
Fiscal year costs were $88,772 for navigation studies, 
$356,673 for flood control studies, and $124,446 for 
comprehensive basin studies. Special studies continued 
during fiscal year on Great Lakes water levels and soil 
conservation coordination studies cost $16,364. 
52. COLLECTION AND STUDY OF BASIC 
DATA 
The Flood Plain Management Services (FPMS) 
Unit within the Detroit District is responsible for the 
flood plain management program which includes; (1) 
the provision of services and guidance in flood plain 
management activities, (2) the preparation of flood 
plain information reports, and (3) the provision of 
technical services to Federal agencies in compliance 
with Executive Order 11296 and to State and local 
agencies, and (4) comprehensive flood damage prevention 
planning. 
a. Flood Plain Management Services Unit: Numerous 
contacts were made with officials of Federal, state and 
local agencies and private organizations to press the 
importance of flood plain management acitivities and 
the techniques of their application. Special technical 
services were provided in response to numerous 
requests to satisfy immediate critical needs. FPMS 
program literature and completed flood plain information 
reports were transmitted to representatives 
of local and State governments, various consultants, 
libraries and interested organizations as well as 
concerned citizens. 
Conferences and discussions were conducted with 
the coordinating agencies for the states of Ohio, 
Indiana and Michigan as well as municipal consulting 
engineers and planners, representatives of the private 
sector to include land developers and housing specialists 
and their attendant legal and economic 
specialists. With the application and distribution of 
flood plain information reports, assistance was given in 
the adoption of flood plain zoning ordinances. 
During the Fiscal Year 1970, close cooperation was 
maintained with the Bureau of Water Managements, 
Michigan, Ohio and Indiana Departments of Natural 
Resources, those state agencies designated as the 
coordinating offices responsible for establishing priorities 
for flood plain information reports and administering 
and policing enabling legislation. For 
Michigan these are Acts 167 and 288. Representatives 
of these agencies assisted with local authorities, in the 
formal presentation of completed FPI reports at public 
hearings. These included the Grand River, Ingham 
and Eaton Counties; Grand River, Lansing; and the 
Lookingglass River, Michigan. Continuing FPI report 
studies include the Middle, Upper, and Lower Rouge, 
the Clinton River, Oakland County, Michigan and the 
Maumee River, Napoleon and Defiance, Ohio. The 
920

DETROIT, MICH., DISTRICT 
total cost for the completed studies was $149,000. For 
the continuing studies the total expenditures to date 
are $245,116.00. The technical services effort has 
elicited increased interest particularly with respect to 
the support of Federal agencies and compliance with 
Executive Order 11296. These involve 14 for HUDFHA, 
8 for EDA, 3 for Post Office, 9 for GSA, and 5 for 
state agencies. Technical support was also given to 6 
communities, and 26 consultants and individuals. 
A special effort was put forth in assisting the City of 
Southfield, Michigan, with the preparation of flood 
plain zoning ordinance. This entailed numerous 
meetings and inspections with consultants and representatives 
of various conservation groups. 
Comprehensive flood damage prevention planning, 
treatment of nonstructural alternatives relating to 
survey investigations and reports were continued for 
the Manistique and Indian Rivers, Michigan, and the 
Maumee River Basin, Indiana and Ohio. Basic data 
relating to resolution of flood problems were collected 
and investigations completed. Efforts were made to 
determine feasible and appropriate corrective measures. 
Total cost was $2,345. 
921

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 30-A 
See 
Section 
in Text Project 
1. Alpena Harbor, 
Mich. 
2. Au Sable Harbor 
at Au Sable 
River (Oscoda), 
Mich. 
3. Black River (Port 
Huron), Mich. 
4. Bolles Harbor, 
Mich. (Federal 
Funds) 
(Contrib. 
Funds) 
5. Charlevoix Harbor, 
Mich. 
6. Clinton River, 
Mich. 
7. Detroit River, 
Mich. 
8. Frankfort Harbor, 
Mich. (Federal 
Funds) 
(Contrib. 
Funds) 
COST AND FINANCIAL STATEMENT 
Total to 
Funding FY67 FY68 FY69 FY70 June 30, 1970 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
$ 40,000 
732 
2,002 
2,002 
63,000 
60,244 
15,000 
976 
4,852 
4,852 
21,500 
38,078 
255,000 
62,692 
15,000 
14,939 
170,000 
244,361 
10,000 
4,615 
80,000 
184,278 
570,700 
677,023 
5,494 
61,000 
57,099 
357 
$ -31,057 
5,216 
22 
22 
2,995 
18,000 
18,000 
65,000 
67,315 
13,819 
-15,000 
86,309 
124,225 
5,000 
3,849 
39,261 
5,384 
20,345 
11,645 
645,000 
636,348 
200,150 
7,560 
33,000 
34,585 
-8,000 
34,000 
35,002 
35,002 
17,500 
17,927 
5,285 
921 
921 
31,157 
913 
913 
31,157 
38,500 
26,569 
205,000 
237,361 
65,950 
64,880 
-6,000 
2,003 
647,200 
662,856 
-9,527 
2,811 
66,200 
48,025 
-2,291 
13,812 
$ 337,394 
337,3941 
294,181 
294,181 
209,7762 
209,7762 
1,052,126 
1,050,831 
175,3233 
161,595 
421,4683 
421,468 
208,500 
206,897 
913 
913 
255,000 
206,897 
82,223 
82,223 
671,194 
655,973 
1,180,000 
1,025,949 
549,7984 
549,7984 
486,112 
483,906 
76,601,360s 
76,597,019s 
7,029,746 
7,028,594 
1,923,450 
1,923,450 
1,490,897 
1,464,226 
274,776 
274,776 
31,709 
31,709 
922 
65,000 
63,719 
20,000 
1,192 
8,298 
-11,177 
31,500 
31,663 
25,000 
404,942 
5,000 
3,864 
-50,000 
8,163 
630,500 
623,314 
-25,000 
160,960 
71,000 
66,948 
-724 
17,897

TABLE 30-A (Cont'd) 
See 
Section 
in Text Project 
9. Grand Haven Harbor 
and Grand 
River, Mich. 
10. Grand Marais Harbor, 
Mich. 
11. Grays Reef 
Passage, Mich. 
12. Harbor of Refuge 
at Harbor 
Beach, Lake 
Huron, Mich. 
13. Holland Harbor, 
Mich. 
14. The Inland Route, 
Mich. (Federal 
Funds) 
15. Kelleys Island 
Harbor, Ohio 
16. Lake St. Clair, 
Mich., Channels 
DETROIT, MICH., DISTRICT 
COST AND FINANCIAL STATEMENT 
Total to 
Funding FY67 FY68 FY69 FY70 June 30, 1970 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
165,000 
167,206 
-14,549 
12,000 
8,013 
300,000 
72,000 
196,005 
176,173 
112,000 
105,221 
-8,475 
123,000 
230,926 
2,049 
2,049 
130,000 
127,518 
205,000 
243,736 
11,225 
16,029 
220,000 
20,217 
20,217 
1,851 
1,851 
-90,500 
83,000 
93,828 
40,000 
140,413 
18,600 
15,410 
5,000 
5,000 
6,200 
10,358 
251,870 
219,137 
226,700 
191,167 
1,906 
1,906 
170,000 
87,414 
139,560 
134,316 
6,700 
4,898 
159,100 
150,485 
100 
44,000 
40,381 
25,000 
18,393 
-90 
154,000 
161,525 
248,300 
260,555 
-25,000 
297,696 
415,000 
415,096 
67,700 
70,463 
141,600 
143,573 
103 
60,450 
58,635 
475,000 
2,000 
106,900 
46,409 
$ 1,283,4696 
1,283,4696 
6,746,4787 
6,722,822 
813,613 
813,613 
990,268 
990,268 
941,095 
941,095 
665,000 
385,110 
109,521 
109,521 
575,813 
570,665 
1,200,598 
1,200,598 
1,894,858 
1,894,319 
195,500 
194,504 
771,8418,9 
771,8418,9 
2,465,2338 
2,458,5918 
502,452 
502,452 
926,16210 
915,39610 
227,789 
219,165 
505,000 
25,393 
7,675,237 
7,675,2371 
2,311,784 
2,223,603 
923

TABLE 30-A (Cont'd) 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
17. LesChaneaux Islands 
Channels, 
Mich. (Federal 
Funds) 
(Contrib. 
Funds) 
18. Little Lake Harbor, 
Mich. 
19. Lundington Harbor, 
Mich. 
20. Manistee Harbor, 
Mich. 
21. Manistique Harbor 
Mich. 
22. Monroe Harbor, 
Mich. 
23. Muskegon Harbor, 
Mich. 
24. Pentwater Harbor, 
Mich. 
Funding 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
$ 37,000 $ 194,000 
4,985 99,139 
61 
36,000 
34,816 
40,000 
43,923 
-38,159 
75,000 
76,541 
60,000 
64,691 
32,859 
115,000 
126,961 
70,000 
66,800 
87,000 
54,174 
296,977 
85,000 
88,637 
236,000 
123,278 
49,000 
50,577 
73,000 
73,382 
-8,409 
41,229 
79,700 
79,798 
71,200 
74,017 
1,900 
4,571 
34,800 
75,277 
-37,168 
71,280 
72,336 
- $ -80,000 
3,849 2,335 
7,588 
1,739 
2,600 
2,444 
83,950 
82,055 
11,000 1,056,600 
9,971 71,925 
83,100 
83,417 
6,965 
6,622 
250,163 
200,433 
140,700 
140,700 
49,800 
49,654 
113,300 
111,160 
-836 
25,100 
16,467 
125,700 
174,029 
100,700 
84,127 
86,200 
91,049 
$ 156,000 
113,194 
236,000 
130,866 
600,47013 
600,47013 
277,050 
274,849 
1,527,50214 
1,527,50214 
4,721,00015 
3,734,31815 
375,924 
375,914 
2,696,52216 
2,696,52216 
1,996,83317 
1,994,44917 
1,374,164 
1,374,164 
1,299,35518 
1,299,3558 
1,383,922 
1,374,946 
316,333 
316,333 
987,34019 
987,34019 
2,667,97019 
2,662,83819 
2,912,11020 
2,912,11020 
1,909,31521 
1,891,826 
742,832 
742,832 
179,899 
179,899 
1,409,352 
1,409,275 
924

TABLE 30-A (Cont'd) 
See 
Section 
in Text Project 
25. Point Lookout 
Harbor (Au Gres 
River), Mich. 
(Federal Funds) 
(Contrib. 
Funds) 
26. Port Clinton 
Harbor, Ohio 
27. Port Sanilac 
Harbor, Mich. 
28. Rouge River, 
Mich. 
29. Saginaw River, 
Mich. 
30. St. Clair River, 
Mich. 
31. St. Joseph Harbor, 
Mich. 
32. St. Marys River, 
Mich. 
33. Saugatuck Harbor 
and Kalamazoo 
River, Mich. 
DETROIT, MICH., DISTRICT 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
21,383 
$ 25,000 $ 150,000 
12,761 42,291 
$ -60,000 
50,929 
104,500 
Funding 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
2,148 
2,148 
14,000 
6,273 
386 
386 
-212,151 
420 
342,192 
387,610 
458,300 
879,939 
268,850 
434,924 
25,000 
2,234 
229,000 
225,341 
67,900 
86,473 
200,000 
3,190,000 
3,897,008 
2,837,500 
2,817,294 
43,600 
50,291 
83,000 
74,746 
3,991 
979 
979 
-161,000 
1,067,500 
314,056 
2,758,800 
3,250,153 
308,700 
299,932 
6,465 
414,200 
420,288 
123,600 
124,272 
185,000 
72,090 
581,970 
3,347,300 
3,428,173 
35,000 
34,723 
-5,760 
2,494 
1,000 
4,487
4
4 
425,000 
1,188,317 
2,071,000 
1,774,915 
313,200 
330,106 
-19,000 
6,223 
529,100 
512,531 
99,000 
85,745 
-24,165 
50,000 
117,297 
3,302,949 
3,288,089 
106,229 
104,462 
925 
451-584 0-72-59 
$ 172,520 
141,913 
104,500 
71,950 
71,950 
232,796 
232,796 
684,14522 
683,89522 
92,104 
92,104 
675,25123 
675,25123 
5,996,28824 
5,980,80524 
15,224,06125 
14,908,99825 
4,714,980 
4,708,585 
19,213,24626 
19,210,41526 
3,937,083 
3,918,628 
976,48427 
976,484 
3,020,949 
3,004,268 
726,152 
365,317 
150,429,67928 
150,351,93228 
66,080,398 
65,957,288 
364,52729 
364,527 
1,615,01030 
1,611,19030 
1,123 
1,123 
919 
919 
373,000 
331 
455,000 
386,976 
260,000 
123,512 
200,000 
39,858 
-90,000 
3,366 
197,000 
199,932 
125,000 
104,173 
-4,721 
7,940,000 
8,172,099 
2,802,400 
2,735,271 
30,000 
45,844

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 30-A (Cont'd) 
Sec 
Se 
in 
ction 
Text Project 
34. South Haven 
Funding 
New Work: 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
Harbor, Mich. Approp. $ - $ - $ - $ - $ 452,42631 
Cost - - - - 452,426 
Maint. 
Approp. 117,000 57,000 59,000 137,700 2,045,57532 
Cost 115,100 69,300 57,683 135,186 2,041,094 
Rehab. 
Approp. -48,698 150,000 175,000 -125,000 1,079,770 
Cost - - - - 879,770 
35. Toledo Harbor, New Work: 
Ohio Approp. 49,000 -13,000 - - 17,191,84233 
Cost 123,302 1,764 - - 17,191,84233 
Maint. 
Approp. 787,000 964,000 1,032,000 1,157,280 14,508,418 
Cost 833,196 1,161,359 804,144 1,140,420 14,253,381 
36. White Lake New Work: 
Harbor, Mich. Approp. - - - - 207,862 
Cost - - - - 207,862 
Maint. 
Approp. - 71,000 40,000 43,000 1,130,396 
Cost 4,027 70,017 35,726 46,962 1,128,696 
37. Whitefish Point New Work: 
Harbor, Mich. Approp. 3,000 12,000 109,000 - 772,405 
Cost 1,373 10,648 111,036 177 771,639 
Maint. 
Approp. 1,571 1,823 11,000 1,250 20,670 
Cost 1,571 1,823 6,000 4,721 19,141 
42. Grand River at New Work: 
Lansing, Mich. Approp. - 50,000 -37,700 -5,000 7,300 
Cost - 2,722 3,112 1,169 7,003 
43. Kalamazoo River, New Work: 
Kalamazoo, Mich. Approp. 75,000 100,000 108,757 5,000 338,757 
Cost 95,560 89,701 90,681 24,194 326,796 
44. Kawkawlin River, New Work: 
Mich. Approp. 847,000 - - - 1,000,000 
Cost 22,513 49,540 485,829 334,535 950,324 
(Contrib. New Work: 
Funds) Approp. - - - 31,029 31,029 
Cost - - - 31,029 31,029 
45. River Rouge, New Work: 
Mich. Approp. 930,000 1,000,000 2,281,000 -2,080,000 3,243,000 
Cost 189,858 859,776 1,282,070 282,898 3,091,974 
46. Saginaw River, New Work: 
Mich. Flood Con- Approp. 600,000 800,000 700,000 1,200,000 6,083,000 
trol (Federal Cost 1,026,083 349,234 1,464,014 1,303,064 5,937,953 
Funds) 
(Contrib. New Work: 
Funds) Approp. - - - - 56,000 
Cost - - 172 - 172 
47. Sebewaing River, New Work: 
Mich. Approp. - - - - 365,642 
Cost - - - - 365,642 
Maint. 
Approp. 3,900 6,600 7,920 4,037 250,644 
Cost 6,675 7,620 5,369 5,549 249,568 
926

DETROIT, MICH., DISTRICT 
COST AND FINANCIAL STATEMENT 
1. Includes $18,889 for previous projects. 
2. Includes $114,786 for previous projects and $16,400 
Contributed Funds for existing project. 
3. Includes $85,849 for new work and $12,008 for maintenance 
for previous projects. 
4. Includes $25,500 for previous projects, and $289,752 
Contributed Funds for existing project. 
5. Includes $2,097,254 for previous projects. 
6. Includes $311,329 for previous projects. 
7. Includes $13,427 for previous projects. 
8. Includes $176,620 for new work and $127,598 for 
maintenance for previous projects. 
9. Includes $35,705 Contributed Funds for existing 
projects. 
10., Includes $148,000 Contributed Funds for existing 
projects. 
11. Includes $656,000 for previous projects. 
12. Includes $235,346 for previous projects. 
13. Includes $57,670 Contributed Funds. 
14. Includes $491,416 for previous projects. 
15. Includes $126,451 for previous projects. 
16. Includes $354,999 for previous projects. 
17. Includes $150,910 for previous projects. 
18. Includes $3,955 for previous projects. 
19. Includes Contributed Funds of $300,000 for new work 
and $166,667 for maintenance. Contributed by: Port Commission 
of Monroe, $300,000: Consolidated Paper Co., $125,000; 
and River Raisin Paper Co. $41,667. 
20. Includes $613,408 for previous projects. 
21. Includes $446,183 for previous projects. 
22. Includes $130,100 Contributed Funds. 
23. Includes $50,083 for previous projects. 
24. Includes $56,608 for previous projects. 
25. Includes $962,556 for previous projects. 
26. Includes $1,671,660 Public Works Funds and $49,419 
Emergency Relief Funds. 
27. Includes $503,113 for previous projects. 
28. Includes $2,904,807 for previous projects. 
29. Includes $90,232 for previous projects. 
30. Includes $117,554 for previous projects. 
31. Includes $187,233 for previous projects. 
32. Includes $131,239 for previous projects. 
33. Includes $1,624,695 for previous projects. 
927 
TABLE 30-A (Cont'd)

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Sept. 19, 1890 
Mar. 2, 1919 
Sept. 22, 1922 
Aug. 30, 1935 
Oct. 27, 1965 
Annual Report 1889, p. 2288, 
H. Doc. 830, 65th Cong., 2d 
Sess., and Rivers Committee 
Doc. 1, 67th Cong., 1st 
Sess. 
Rivers and Harbors Comm. Doc. 
42, 72d Cong., 1st Sess. 
H. Doc. 151, 88th Cong., 1st Sess.1 
ALPENA HARBOR, MICH. (See Section 1 of Text) 
Channel Depth of 16.5 Feet. 
Rubblemound Breakwater for Protecting Channel 
on South Side, and Widening Entrance Channel. 
21 and 18.5-Foot Channel Depths and Turning Basin. 
Present Project Dimensions, New Turning Basin, 
Removal of Old Breakwater, and Construction 
of New Breakwater. 
AU SABLE HARBOR AT AU SABLE RIVER (OSCODA), MICH. 
(See Section 2 of Text) 
Dredging Channels 12 and 10 Feet Deep and 
Riprapping North Pier. 
BLACK RIVER (PORT HURON), MICH. (See Section 3 of Text) 
Channel From Mouth of Grand Trunk R.R. Bridge 
Channel From Grand Trunk R.R. Bridge to 
Washington Ave. 
Consolidation of Projects for Black River at Port 
Huron and Mouth of Black River. 
Settling Basin. 
Deepening Channel and Settling Basin to 20 Feet, 
and Widening to 100 Feet 2 Bends; 1 at the Foot 
of 12th St., the Other Below the Grand Trunk 
R.R. Bridge. 
Extension of Existing Channel. 
BOLLES HARBOR, MICH. (See Section 4 of Text) 
Entrance Channel in Lake Erie, Access Channel in 
La Plaisance Creek, Steel Sheet Pile Revetment. 
CHARLEVOIX HARBOR, MICH. (See Section 5 of Text) 
Channel from Lake Michigan to Round Lake Protected 
Where Needed by Piers and Revetments. 
Channel from Round Lake to Lake Charlevoix. 
Project Depth Increased to 15 Feet. 
Project Depth Increased to 18 Feet. 
CLINTON RIVER, MICH. (See Section 6 of Text) 
Channel in River and Lake St. Clair, Pile Dike, 
Closing Channels and Making Cutoff, and 
Revetments as Needed. 
Widening Entrance Channel and Constructing 
Protected Harbor Basin. 
DETROIT RIVER, MICH. (See Section 7 of Text) 
Amherstburg Channel and Removal of Grosse Ile 
Shoal. 
Fighting Island Channel. 
Livingstone Channel. 
928 
TABLE 30-B 
H. Doc. 446, 78th Cong., 2d Sess. 1 
Annual Report 1889, p. 2291 
No Printed Report. 
H. Doc. 436, 64th Cong., 1st Sess. 
H. Doc. 162, 71st Cong., 2d Sess. 
Rivers and Harbors Committee 
72d Cong., 2d Sess. 
Section 107, 1960 River and 
Harbor Act. 
Section 107, 1960 River and 
Harbor Act. 
S. Ex. Doc. 16, 44th Cong., 
1st Sess., and Annual 
Report 1876, p. 523. 
No Prior Survey or Estimates. 
No Prior Survey or Estimate. 
S. Doc. 163, 75th Cong., 3d Sess. 1 
S. Doc. 199, 46th Cong., 2d Sess., 
Annual Report 1880, p. 2062 and 
H. Doc. 210, 48th Cong., 2d Sess., 
and Annual Report 1886, p. 2190. 
Section 107, 1960 River and Harbor 
Act. 
H. Docs. 712, 56th Cong., 1st Sess., 
and 40, 58th Cong., 3d Sess. 
H. Doc. 17, 62d Cong., 1st Sess. 
H. Docs. 266, 59th Cong., 2d Sess., 
676, 61st Cong., 2d Sess., and 
322, 65th Cong., 1st Sess. 
Mar. 2, 1945 
Sept. 19,1890 
July 13, 1892 
Sept. 22, 1922 
July 3, 1930 
Aug. 30, 1935 
April 23, 1970 
July 6, 1965 
Aug. 14, 1876 
Aug. 2, 1882 
June 13, 1902 
June 20, 1938 
Aug. 5, 1886 
July 19, 1963 
June 13, 1902 
Mar. 3, 1905 
June 25, 1910 
Mar. 4, 1913 
Mar. 2, 1907 
June 25, 1910 
Mar. 2, 1910

DETROIT, MICH., DISTRICT 
TABLE 30-B (Cont'd) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
July 3, 1930 
Aug. 30, 19352 
Aug. 26, 1937 
Mar. 2, 1945 
July 24, 1946 
May 17, 1950 
Mar. 21, 1956 
July 14, 1960 
Aug. 13, 1968 
June 23, 18663 
Mar. 3, 1925 
Aug. 26, 1937 
Oct. 27, 1965 
Channel Depths of 26 and 25 Feet. 
Channel To Wyandotte 21 Feet Deep and 300 
Feet Wide Through Middle Ground Opposite 
Head of Fighting Island. 
Trenton Channel and Turning Basin (West of 
Grosse Ile). 
American Channel North of Belle Isle Between 
Windmill Point and Fairway Slip, Detroit. 
Deepen Westerly 300 Feet of Amherstburg Channel 
and Ballards Reef Channel Below Livingstone 
Channel to 27 Feet to Provide Depths Adequate 
for 24-Foot Draft Navigation When Governing 
Lakes are at Datum, with Necessary Widening 
at Approaches and Bends and Construction of 
Necessary Compensating Works, Detroit River. 
Extend Turning Basin in Trenton Channel 600 Feet, 
Dredge Through East Draw of Lower Grosse Be 
Bridge, and Extend 300-Foot Width of Channel 
North of Lower Grosse Ile Bridge. 
Channel Depth of 28.5 Feet Throughout 
Downbound and Two-Way Channels, Except 
in Upper (27.7-Foot Depth) and Lower, 
(29-Foot Depth) Livingstone Channel, 
and in Upbound Channel; 27-Foot Depth 
in Ballards Reef Channel Below Junction 
with Livingstone Channel, 27.5-Foot 
Depth in Westerly 300-Foot Width of Limekiln 
Crossing and Amherstburg Reaches, and 28.5- 
Foot Depth in Westerly 300-Foot Width of 
Hackett Reach, with Necessary Compensation 
Works. Also 28.5-Foot Depth in Lake Erie 
from Detroit River to Pelee Passage Shoal, 
Inclusive. 
Trenton Channel; Deepen to 27 Feet, Where 
Necessary, Wyandotte Reach from Detroit 
River to Upper Grosse Ile Bridge, About 
5.5 Miles, Deepen to 28 Feet and Widen to 
300 Feet Below Upper Grosse Ile Bridge to 
and Including a Turning Basin 28 Feet 
Deep and 15 Acres in Area Outside 
Project Limits. 
Trenton Channel; Deepen to 28 Feet and 
Widen to 300 Feet from the Upper Turning 
Basin at Trenton to Gibraltar, about 
20,500 Feet Downstream; Construct a Turning 
Basin at Gibraltar at a Depth of 28 Feet, 
Width of 830 Feet, and Length of 1,500 
Feet; Build Compensating Works to Maintain 
Water Levels. 
FRANKFORT HARBOR, MICH. (See Section 8 of Text) 
A New Outlet 12 Feet Deep Protected by 
Piers and Revetments. 
Exterior Breakwaters, Removal of Portions 
of Piers, Project Dimensions of Outer 
Basin. 
Dredge the Area in Lake Betsie. 
Deepen Approach and Entrance Channels, 
Extend Inner Basin, and Dredge 
Recreational Anchorage Area. 
GRAND HAVEN HARBOR, MICH. (See Section 9 of Text) 
Piers and Revetments. S. Ex. Doc. 42, 35th Cong., 1st 
Sess. 
929 
Documents 
H. Doc. 253, 70th Cong., 1st Sess. 
Rivers and Harbors Committee 
Doc. 1, 72d Cong., 1st Sess. 1 
H. Doc. 205, 75th Cong., 1st Sess. 
H. Doc. 734, 79th Cong., 2d Sess. 
H. Doc. 335, 80th Cong., 1st Sess. 
S. Doc. 30, 81st Cong., 1st Sess. 1 
S. Doc. 71, 84th Cong., 1st Sess. 1 
H. Doc. 319, 86th Cong., 2d Sess. 1 
H. Doc. 338, 90th Cong. 2d Sess. 1 
H. Doc. 482, 55th Cong., 2d Sess. 
H. Doc. 208, 68th Cong., 1st Sess. 
H. Doc. 511, 74th Cong., 2d Sess. 
S. Doc. 16, 89th Cong., 1st Sess. 1 
June 23, 1866

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 30-B (Cont'd) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
June 14, 1880 
Sept. 19, 1890 
July 13, 1892 
July 3, 1930 
Aug. 26, 1937 
Mar. 2, 1945 
June 14, 1850 
June 14, 1850 
May 17, 1930 
Aug. 30, 1935 
Mar. 3, 1871 
Aug. 8. 1917 
Jan. 21, 1927 
Aug. 30, 1852 
Mar. 2, 1867 
Mar. 3, 1899 
Mar. 3, 1905 
July 3, 1930 
Aug. 30, 1935 
Sept. 3, 1954 
Sept. 3, 1954 
Sept. 2, 1964 
April 2, 1968 
Piers and Revetments. 
Piers and Revetments. 
Piers and Revetments. 
Present Project Dimensions of Harbor 
Channel to Grand Trunk Car Ferry Slip 
and River Channel, Eliminating all of 
that Portion of Grand River Above Bass 
River, Consolidation of Projects for 
Harbor and River. 
Channel to Spring Lake. 
Present Project Dimensions of Harbor 
Channel from Car Ferry Slip to Grand 
Trunk Railway Bridge and Turning Basin. 
GRAND MARAIS HARBOR, MICH. (See Section 10 of Text) 
Existing Project, Except for Pile Dike. 
For Pile Dike. 
800-Foot Extension of West Pier. 
GRAYS REEF PASSAGE, MICH. (See Section 11 of Text) 
Improvement of Passage Over a 3,000-Foot Width 
and a Depth of 25 Feet. 
HARBOR OF REFUGE AT HARBOR BEACH, LAKE HURON, 
MICH. (See Section 12 of Text) 
Adopted site and made provision for harbor. 
Closing North Entrance and Dredging 
Main Entrance and Anchorage Area. 
Removal of Portion of Breakwater in 
interest of sanitation. 
HOLLAND HARBOR, MICH. (See Section 13 of Text) 
Artificial Channel Between Lakes 
Macatawa and Michigan. 4 
Piers and Revetments. 4 
Extending Inner Piers. 
Coverging Breakwater. 
Channel to Holland and Turning Basin 
at Holland. 
Present Project Dimensions of Channels 
and Turning Basin. 
Widen Bend in Reveted Entrance Channel 
into Lake Macatawa, Dredge Channel in 
Black River, and Widen and Extend 
Turning Basin. 
THE INLAND ROUTE, MICH. (See Section 14 of Text) 
Channel 30 Feet Wide and 5 Feet Deep 
Through Lakes and Rivers with Suitable 
Jetties. 
Lock and Dam. 
KELLEYS ISLAND HARBOR, OHIO (See Section 15 of Text) 
Breakwaters, Channels, Access and 
Maneuvering Area. 
930 
Documents 
S. Ex. Doc. 42, 35th Cong., 1st 
Sess. 
S. Ex. Doc. 42, 35th Cong., 1st 
Sess. 
S. Ex. Doc. 42, 35th Cong., 1st 
Sess. 
S. Doc. 88, 71st Cong., 2d Sess. 1 
Rivers and Harbors Committee 
Doc. 1, 75th Cong., 1st Sess.1 
H. Doc. 661, 76th Cong., 3d Sess. 1 
Specified in Act, Annual Report 
1881, p. 2050. 
Annual Report 1895, p. 351 
H. Doc. 751, 80th Cong., 2d Sess. 
H. Doc. 5, 74th Cong., 2d Sess. 1 
Annual Report 1873, p. 292. 
H. Doc. 1700, 64th Cong., 2d Sess.1 
S. Ex. Doc. 42, 35th Cong., 1st 
Sess., Annual Report. 
Annual Report 1866, p. 106. 
H. Doc. 272, 51st Cong., 2d Sess. 
and Annual Report 1887, p. 2950. 
Annual Report 1905, p. 2176. 
H. Doc. 588, 69th Cong., 2d Sess. 
Rivers and Harbors Committee, 
Doc. 48, 74th Cong., 1st Sess. 
H. Doc. 282, 83rd Cong., 2d Sess. 1 
H. Doc. 142, 82d Cong., 1st Sess. 
Chief of Engineers. 
Section 107, 1960 River and 
Harbor Act

DETROIT, MICH., DISTRICT 
TABLE 30-B (Cont'd) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
LAKE ST. CLAIR, MICH., CHANNELS (See Section 16 of Text) 
Two Dikes. 
Deepening Canal and Dredging Channel 
at Grosse Pointe. 
Second Canal for Downbound Vessels. 
21-Foot Depth in Grosse Pointe Channel 
for About 5.25 Miles. 
25-Foot Depth Through Canals and Channel 
Through Lake St. Clair. 
Removal of Center Dike and Widening 
Channel to 700 Feet. 
Deepening Channel to 27.5 Feet and 
Abandonment of Channel Above Mouth of 
Southeast Bend Cutoff Channel. 
LES CHENEAUX ISLANDS CHANNELS, MICH. (See Section 17 of Text) 
Removing Shoals and Bend Widening Over Small 
Boat Course to Provide 7-Foot Depth Over 
100-Foot Minimum Width. 
LITTLE LAKE HARBOR, MICH. (See Section 18 of Text) 
12-Foot Deep Channel from Lake Superior into 
Little Lake, Breakwaters and Revetments. 
LUDINGTON HARBOR, MICH. (See Section 19 of Text) 
Entrance Piers. 
Pier Extension Reconstruction and Repairs 
to Existing Structures, and Present 
Project Dimensions of Channel. 
Breakwaters, Shore Connections, and 
Removal of Outer Ends of the Two Inner 
Piers. 
MANISTEE HARBOR, MICH. (See Section 20 of Text) 
Entrance Piers. 
Extending Channel 8,000 Feet to Connect 
with Manistee Lake, and Further Pier 
Extension. 
Depth of 20 Feet in Outer Harbor 570 
Feet Wide to Outer End of South Pier 
18 Feet Deep in River, South Breakwater 
with Shore Connection, and Extend North 
Pier if Required. 
23-Foot Depths in Entrance Channel and 
21-Foot Depths in River Channel. 
Remove Old South Revetment, Construct 
New South Pier and Revetment, and Widen 
River Entrance Channel. 
Present Project Dimensions of Channel 
Through Outer Basin and River, and 
Federal Participation in Cost of Replacing 
Maple Street Bridge. 
MANISTIQUE HARBOR, MICH. (See Section 21 of Text) 
Breakwaters and Outer Harbor. 
Present Location of West Breakwater and 
Pier at River Mouth. 
Present Project Dimensions of Channel. 
Annual Report 1885, p. 2150. 
H. Doc. 297, 51st Cong., 2d Sess. 
H. Doc. 234, 56th Cong., 2d Sess. 
H. Doc. 188, 65th Cong., 1st Sess. 
H. Doc. 253, 70th Cong., 1st Sess. 
Rivers and Harbors Committee 
Doc. 3, 72d Cong., 1st Sess. 
S. Doc. 71, 84th Cong., 1st Sess.1 
Section 107, 1960 River and Harbor 
Act. 
H. Doc. 446, 78th Cong., 2d Sess.1 
Annual Report 1867, p. 114. 5 
H. Doc. 273, 54th Cong., 2d Sess., 
and Annual Report 1897 p. 2951. 5 
H. Doc. 62, 59th Cong., 1st Sess., 
and Rivers and Harbors Committee 
Doc. 3, 59th Cong., 2d Sess. s 
Annual Report 1867, p. 115. 
Annual Report 1891, p. 2678. 
H. Doc. 599, 62d Cong., 2d Sess. 
S. Doc. 131, 71st Cong., 2d Sess. 
H. Doc. 380, 77th Cong., 1st Sess. 
H. Doc. 358, 86th Cong., 2d Sess. 1 
H. Doc. 429, 58th Cong., 2d Sess. 
Annual Report 1908 p. 648, and 
Unpublished Report of Mar. 13, 
1908, Approved by Secretary of 
War, Apr. 3, 1908. 
H. Doc. 721, 80th Cong., 2d Sess. 1 
931 
Aug. 5, 1886 
July 13, 1892 
June 13, 1902 
Mar. 2, 1919 
July 3, 1930 
Aug. 30, 19332 
Mar. 21, 1956 
Documents 
Mar. 15, 1967 
Mar. 2, 1945 
Mar. 2, 1867 
Mar. 3, 1899 
Mar. 2, 1907 
Mar. 2, 1867 
Sept. 19, 1890 
July 25, 1912 
July 3, 1930 
Mar. 2, 1945 
July 14, 1960 
Mar. 3, 1905 
Mar. 2, 1907 
May 17, 1950

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 30-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Feb. 24, 18357 
July 3, 1930 
July 14, 19329 
Aug. 26, 1937 
June 13, 1902 
Mar. 3, 1925 
Aug 30. 1935 
Oct. 23, 1962 
Mar. 2, 1867 
Mar. 3,1873 
July 5, 1884 
July 13, 1892 
Mar. 25, 1907 
Mar. 2, 1945 
June 10, 1872 
Mar. 2, 1945 
June 1, 1970 
Aug. 8, 1917 
Aug. 30, 193512,13 
July 3, 1958 
Oct. 23, 1962 
June 25, 1910 
MONROE HARBOR, MICH. (See Section 22 of Text) 
9-Foot Channel, Protecting Revetments 
and Piers. 
21-Foot Channel, Dikes and Turning Basin.8 
Modified Conditions of Local Cooperation 
Imposed by Act of July 3, 1930. 
MUSKEGON HARBOR, MICH. (See Section 23 of Text) 
Piers and Revetments. 
Breakwaters. 
Repairing Revetments Around Car Ferry Slip. 
Channel Deepening and Present Project 
Dimensions of Channel. 
PENTWATER HARBOR, MICH. (See Section 24 of Text) 
Piers and Revetments, Dredging. 
Piers and Revetments, Dredging. 
Piers and Revetments, Dredging. 
Piers and Revetments, Dredging. 
Present Project Depth of Channel. 
POINT LOOKOUT HARBOR (AU GRES RIVER), MICH. 
(See Section 25 of Text) 
Breakwater, Anchorage Area, Channel Dredging. 
PORT CLINTON HARBOR, OHIO (See Section 26 of Text) 
10-Foot Deep Channel, Jetties. 
PORT SANILAC HARBOR, MICH. (See Section 27 of Text) 
Entrance Channel 12 Feet Deep, Anchorage Basin, 
Breakwaters. 
Breakwater Extensions. 
ROUGE RIVER, MICH. (See Section 28 of Text) 
21-Foot Channel via The Shortcut Canal. 
25-Foot Channel at Mouth of Old Channel, 
1,425 Feet Long and Adjacent to Latter, 
and 21-Foot Channel Extending from 
Junction of Old Channel and Shortcut 
Canal into Old Channel to Detroit, Toledo 
& Ironton R.R. Bridge. 
Old Channel; 100 Feet Wide from Peerless 
Cement Corp. to Junction with Shortcut 
Canal, Widened to 150 Feet at 2 Bends. 
25-Foot Channel Over Modified Limits 
from Detroit River to Jefferson Ave. 
(via Shortcut Canal). 
SAGINAW RIVER, MICH. (See Section 29 of Text) 
Channel 200 Feet Wide, with Depth of 
18.5 Feet in Bay and 16.5 Feet in River. 
Annual Report 1872, p.237. 
Rivers and Harbors Committee Doc. 
22, 71st Cong., 2d Sess. 
Rivers and Harbor Committee Doc. 
12, 72d Cong., 1st Sess., 45, 
75th Cong., 1st Sess. 1 
H. Doc. 104, 56th Cong., 2d Sess. 
H. Doc. 494, 67th Cong., 4th Sess. 
Rivers and Harbor Committee Doc. 
64, 75th Cong., 1st Sess. 
H. Doc. 474, 87th Cong., 2d Sess. 1 
H. Ex. Doc. 70, 39th Cong., 2d 
Sess. 
H. Ex. Doc. 70, 39th Cong., 2d 
Sess. 
H. Ex. Doc. 70, 39th Cong., 2d 
Sess. 
H. Ex. Doc. 70, 39th Cong., 2d 
Sess. 
H. Doc. 181, 59th Cong., 2d Sess. 1 0 
H. Doc. 446, 78th Cong., 2d Sess. 
Annual Report 1875, p. 295, H. Doc. 
815, 61th Cong., 2d Sess. 1 
H. Doc. 446, 78th Cong., 2d Sess. 
Section 107, 1960 River and Harbor 
Act. 
H. Doc. 2063, 64th Cong., 2d Sess. 1 1 
H. Doc. 125, 85th Cong., 1st Sess. 
H. Doc. 509, 87th Cong., 2d Sess. 1 
H. Doc. 740, 61st Cong., 2d Sess. 
932

DETROIT, MICH., DISTRICT 
TABLE 30-B (Cont'd) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
July 3, 1930 
Aug. 26, 1937 
June 20, 1938 
Sept. 3, 1954 
Oct. 23, 1962 
Oct. 27, 1965 
July 13, 1892 
July 8, 1930 
Mar. 2, 1945 
July 24, 1946 
Mar. 21, 1956 
Mar. 3, 1875 
June 14, 1880 
Mar. 3, 1899 
Aug. 30, 1935 
June 2, 1937 
Mar. 2, 1945 
July 3, 1958 
Project Depth of 18.5 Feet Extended Up River 
to Saginaw. 
Turning Basin. 
Present Project Channel Dimensions 
from Bay to Sixth Street Bridge in 
Saginaw. 
New Channel in Bay, 350 Feet Wide and 
24 Feet Deep from 24-Foot Contour to 
River Mouth, Project Depth of 24 Feet 
in River Channel Up to Detroit & Mackinac 
Railway Bridge, Project Depth of 22 Feet 
in River Channel Up to Sixth Street Bridge, 
Turning Basins at Essexville and Carrollton, 
and Elimination of Present Channel in Bay. 
Deepen Bay Channel, Deepen River Channel 
to Detroit & Mackinac Bridge, Extend 22- 
Foot Project Above 6th St. Bridge, 
Deepen Essexville Turning Basin, and Construct 
2 New Turning Basins.14 
Deepen River Channel to 25 Feet from Detroit & 
Mackinac Bridge to New York Central Railroad 
Bridge. 
ST. CLAIR RIVER, MICH. (See Section 30 of Text) 
20-Foot Channel in the River. 
Deepen Channel to 25 and 26 Feet, and 
Compensating Works. 
Widening Channel at Southeast Bend 
to 700 Feet. 
Widen and Deepen Southeast Bend and 
Improve Outlet of North Channel, 
St. Clair River. 
Deepen and Further Improve Channels in 
St. Clair River Between Limits of 27.1 
to 30 Feet to Provide Safe Navigation by 
Vessels with Drafts of 25.5 Feet. A Cutoff 
Channel in Canada at Southeast Bend and 
Abandon Old Southeast Bend Channel. 
ST. JOSEPH HARBOR, MICH. (See Section 31 of Text) 
Interior Revetment.s 
Benton Harbor Canal. 15 
Present Project Dimensions of Piers 
and a Turning Basin. 
Present Project Dimensions of 
Channel and Turning Basin, Near Mouth 
of Paw Paw River. 
Abandon Easterly 1,000 Feet of Canal 
Above West Line of 9th St. 
Turning Basin Above Mouth of Morrison 
Channel and Eliminate Training Basin 
Near Mouth of Paw Paw River. 
Maintenance of Turning Basin Near Mouth 
of Paw Paw River. 
933 
Documents 
Rivers and Harbors Committee 
Doc. 30, 71st Cong., 2d Sess. 
Rivers and Harbors Committee Doc. 
21, 75th Cong., 1st Sess. 
H. Doc. 576, 75th Cong., 3d Sess. 
H. Doc. 500, 83d Cong., 2d Sess. 
H. Doc. 544, 87th Cong., 2d Sess. 
H. Doc. 240, 89th Cong., 1st Sess. 1 
H. Doc. 207, 51st Cong., 2d Sess. 
H. Doc. 253, 70th Cong., 1st Sess. 
H. Doc. 309, 77th Cong., 1st Sess. 
H. Doc. 335, 80th Cong., I1st Sess. 
S. Doc. 71, 84th Cong., 1st Sess. 1 
H. Ex. Doc. 160, 43d Cong., 
2d Sess., and Annual Report 1875, 
pt. 1, p. 263. 
Annual Report 1880, pp. 2030, 2031 
and 2049-2055. 
H. Doc. 307, 55th Cong., 2d Sess., 
and Annual Report 1898, p. 2496. 
Rivers and Harbors Committee Doc. 
52, 74th Cong., 1st Sess. 
H. Doc. 129, 76th Cong., 1st Sess. 
S. Doc. 95, 84th Cong., 2d Sess. 1

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 30-B (Cont'd) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
July 11, 1870 
Aug. 5, 1886 
July 13, 1892 
June 13, 1902 
Mar. 2, 1905 
June 13, 1902 
Mar. 3, 1907 
Mar. 3, 1909 
July 25, 1912 
Mar. 4, 1915 
Sept. 22, 1922 
Jan. 21, 1927 
July 3, 1930 
June 26, 193417 
Aug. 30, 1935 
Mar. 7, 1942 
June 15, 1943 
Mar. 2, 1945 
July 24, 1946 
Mar. 21, 1956 
July 9, 1956 
-- 
ST. MARYS RIVER, MICH. (See Section 32 of Text) 
Weitzel Lock (Replaced in 1943 by Mac 
Arthur Lock), Widen and Deepen 
Existing State Canal.16 
Poe Lock.1 
Dredging Through Shoals Above Falls 
and Shoals Below Falls Between Lower 
End of Canal and Upper Entrance Channel 
into Lake Nicolet (Formerly Hay Lake). 
Enlarging the Old Channel. 
Lake Niclolet and Neebish Channels Work 
in That Section of River Below Locks. 
Davis Lock Second Canal, and Emergency Dam. 
Lease of Waterpower at Falls. Lease 
Entered into with Michigan Northern 
Power Co. Provided for Construction of 
Remedial and Compensating Works. 
Fourth Lock (Renamed 'Sabin' Lock in 1943). 
Deepen Tailrace of Power Plant. 
Widen Upper Approach to Canals Through 
Vidal Shoals, Extend Anchorage and 
Maneuver Area Below Locks. 
Remove Round Island, Middle Ground, 
Extension of Northwest Canal Pier, and 
Widen Channels Middle Neebish Route. 
Deepen Channels Throughout Downbound Route. 
Operation and Care of Canal and Locks 
Provided for from War Department 
Appropriations for Rivers and Harbors. 
Widen Brush Point Turn and Channel from 
Brush Point to Point Louise. 
Construct New (Mac Arthur) Lock on Site 
of Former Weitzel Lock, Deepen Approach 
Channels to 27 Feet, and Reconstruct 
Approach Piers. 
Named 'Mac Arthur' Lock and Changed 
Name of 'Fourth' Lock to 'Sabin' Lock. 
Remove Bridge Island and Construct New 
Hydroelectric Power Plant. 
Replace Poe Lock at St. Marys Falls 
Canal with a New Structure 800 Feet Long, 
100 Feet Wide and 32 Feet Deep, with 
Necessary Construction of Nose and Center 
Piers, and Widen and Deepen Channel 
Across Point Iroquois Shoals and in 
Lake Nicolet to Provide Wider Anchorage 
and Maneuver Areas in St. Marys River. 
Deepen to Provide a Project Safe Draft of 
25.5 Feet Over Full Width to Downbound 
and 2-Way Channels (Including Anchorage 
Areas) and Over Westerly 300-Foot Width 
of Upbound Middle Neebish Channel, When 
Levels of Lake Superior and Huron are 
at Their Respective Low-Water Datums. 
Repeal Authorization of Bridge as a Part 
of Project, Authorize Alteration With 
Cost to be Apportioned by Sec. 6, Truman 
Hobbs Act, June 21, 1940. 
934 
Documents 
Report by Maj. O. M. Poe, Corps of 
Engineers, not Published. 
H. Ex. Doc. 72, 49th Cong., 2d Sess. 
H. Ex. Doc. 207, 51st Cong., 
2d Sess., and Annual Report 1891, 
p. 2810. 
H. Doc. 138, 56th Cong., 2d Sess., 
and 215, 58th Cong., 3d Sess. 
H. Doc. 128, 56th Cong., 2d Sess. 
H. Doc. 333, 59th Cong., 2d Sess. 
(Plan 3). 
H. Doc. 65, 62d Cong., 1st Sess. 
District Engineer Report, 
Oct. 29, 1920. 
H. Doc. 270, 69th Cong., 1st Sess. 
H. Doc. 253, 70th Cong., 1st Sess. 
River and Harbor Committee Doc. 53, 
74th Cong., 1st Sess. 
H. Doc. 218, 77th Cong., 1st Sess. 
H. Doc. 679, 78th Cong., 2d Sess. 
and H. Doc. 339, 77th Cong., 
1st Sess. 
H. Doc. 335, 80th Cong., 1st Sess. 
S. Doc. 71, 84th Cong., 1st Sess. 1 
None

TABLE 30-B (Cont'd) 
DETROIT, MICH., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 3, 1896 
Mar. 2, 1907 
June 25, 1910 
Aug. 11, 1888 
Mar. 3, 1905 
Aug. 30, 1935 
Mar. 3, 1899 
June 25, 1910 
Aug. 30, 1935 
May 17, 1950 
Sept. 3, 1954 
July 3, 1958 
July 14, 1960 
Mar. 2, 1945 
Aug. 17, 1967 
Mar. 2, 1867 
Mar. 3, 1873 
July 5, 1884 
July 13, 1892 
Mar. 2, 1907 
SAUGATUCK HARBOR AND KALAMAZOO RIVER, MICH. 
(See Section 33 of Text) 
Entrance Channel, Piers, and Revetments. 
Deepening Entrance to 16 Feet. 
Deepening Channel in River to 14 Feet. 
SOUTH HAVEN HARBOR, MICH. (See Section 34 of Text) 
Channel from Inner End of Piers to 
Highway Bridge. 4 
Present Dimensions of Piers and for a 
Turning Basin. 
Present Project Dimensions of Channel 
and Turning Basin. 
TOLEDO HARBOR, OHIO (See Section 35 of Text) 
A Channel 400 Feet Wide and 21 Feet 
Deep from 25-Foot Contour in Maumee 
Bay to Fassett Street Bridge, 200 Feet 
Widen and 19 Feet Deep Above that Point 
and a 500-Foot Turning Basin at Upper 
End. A Stone Revetted Earth Dike in 
Maumee Bay Channel. 
Act 1899 Modified to Insure a Navigable 
Channel of 21 Feet from Fassett Street 
Bridge to Lake. 
Channel 25 Feet Deep and 500 Feet Wide 
from 25-Foot Contour to Mount of Maumee 
River (300 Feet Wide on Each Side of 
Center Dike in Bay Channel), Thence 400 
Feet Wide to Fassett Street Bridge, 200 
Feet Wide Above that Point and a Turning 
Basin at Upper End 18 Feet Deep. 
Widening at Bend at Mouth of River Opposite 
Chesapeake and Ohio Railway Dock. 
Removal of Center Dike in Maumee 
Bay Channel. 
Enlarge Widening at Bend Opposite 
Chesapeake and Ohio Dock and Turning 
Basin Opposite American Shipbuilding 
Co. Dock. 
Deepen Bay Channel Including Widenings 
to 28 Feet, Deepen River Channels to New 
York Central Railroad Bridge to 27 Feet 
and Construct New Turning Basin Below 
Anthony Wayne Bridge. 19 
WHITEFISH POINT HARBOR, MICH. (See Section 36 of Text) 
Breakwaters, Entrance Channel, 
Anchorage Basin. 
Breakwater Inside Harbor. 
WHITE LAKE HARBOR, MICH. (See Section 37 of Text) 
New Channel, with Piers and Revetments. 
New Channel, with Piers and Revetments. 
New Channel, with Piers and Revetments. 
New Channel, with Piers and Revetments. 
Present Project Depth of Channel. 
935 
H. Doc. 912, 54th Cong., 1st Sess., 
Annual Report 1896, Vol. 2, 
Pt. 5, p. 2739. 
Annual Report 1907, p. 646. 
H. Doc. 635, 61st Cong., 2d Sess. 18 
No Prior Survey or Estimate. 
H. Doc. 119, 58th Cong., 2d Sess. 
Rivers and Harbors (Committee Doc. 
9, 73 Cong., 1st Sess.1 and 
Unpublished Review Report of Chief 
of Engineers, Dated Dec. 21, 1934. 
H. Doc. 198, 55th Cong., 2d Sess. 
and Annual Report 1898, p. 2693. 
H. Doc. 865, 60th Cong., 1st Sess. 
Rivers and Harbors Committee Doc. 
21, 72d Cong., 1st Sess. 
H. Doc. 189, 81st Cong., 1st Sess. 
H. Doc. 620, 81st Cong., 2d Sess. 
H. Doc. 436, 84th Cong., 2d Sess. 
H. Doc. 153, 86th Cong., 1st Sess. 1 
H. Doc. 446, 78th Cong., 2d Sess. 
Chief of Engineers. 
Unpublished Survey Report of 1868. 
Unpublished Survey Report of 1868. 
Unpublished Survey Report of 1868. 
Unpublished Survey Report of 1868. 
No Prior Survey or Estimate.2 0

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 30-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
GRAND RIVER AT LANSING, MICH. (See Section 42 of Text) 
July 3, 1958 Enlarging Channel of Red Cedar S. Doc. 132, 84th Cong., 2d Sess.1 
River, Clearing and Straightening 
Sycamore Creek, Cutoff Channel for 
Grand River with Diversion Dam and 
Two Drop Structures, Enlarging Channel 
of Grand River, Changes in Railroad 
Crossings, Alterations to Highway 
Bridges Substructures and Necessary 
Channel Protection Works. 
KALAMAZOO RIVER, KALAMAZOO, MICH. (See Section 43 of Text) 
July 3, 1958 Enlarging and Straightening River Channel, S. Doc. 53, 84th Cong., I1st Sess.1 
Riprapping Channel Where Necessary, 
Reinforcement and Reconstruction of 
Bridges as Required, and Alterations 
to Existing Buildings and Utilities. 
KAWKAWLIN RIVER, MICH. (See Section 44 of Text) 
Apr. 7, 1966 Deepening River Channel, Altering Railway Section 205,1948 Flood Control Act. 
Bridge, Riprapping Portions of Channel 
Bottom, and Utility Relocations. 
RIVER ROUGE, MICH. (See Section 45 of Text) 
Oct. 23, 1962 Channel Enlargement and Straightening, H. Doc. 148, 87th Cong., 1st Sess.1 
and Alteration or Replacement of 
Existing Bridges. 
SAGINAW RIVER, MICH., FLOOD CONTROL (See Section 46 of Text) 
July 3, 1958 Flood Control Improvements to H. Doc. 346, 84th Cong., 2d Sess.1 
Saginaw River and its Tributaries 
Including Tittabawassee, Shiawassee 
Flint, and Cass Rivers. 
SEBEWAING, SEBEWAING RIVER, MICH. (See Section 47 of Text) 
Aug. 18, 1941 Enlarging Present Channel of Sebewaing H. Doc. 286, 76th Cong., 1st Sess. 1 
River, Altering Railroad and Highway 
Bridges, Removal of Dike. 
1. Contains latest published map. 
2. Included in Public Works Administration Program, Sept. 
6, 1933. 
3. Amended 1868, 1879, and 1892. 
4. Completed under previous project. 
5. Latest published map is in Annual Report for 1914, p. 
2974. 
6. Project complete, although not constructed to full length 
as originally authorized. 
7. Modified by Act of June 10, 1872. 
8. Riprapping of protecting dikes portion of project is 
inactive. 
9. War Department Appropriations Act. 
10. Latest published map is in H. Doc. 303, 66th Cong., 1st 
Sess. 
11. Contains latest published maps. See also map with Rivers 
and Harbors Committee Doc. 19, 72d Cong. 1st Sess. 
12. Including Emergency Relief Administration Work authorized 
May 28, 1935. 
13. Except for dredging 25-foot channel to 1,150 feet 
upstream of mouth in old channel, work authorized in this act is 
considered inactive. 
14. 22-foot project extended to C&O R.R. Bridge and turning 
basin relocated under authority of Chief of Engineers. 
15. Completed under previous projects. Public Law 130, 75th 
Cong., 1st Sess. 
16. Completed under previous projects. 
17. Permanent Appropriations Repeal Act. 
18. Latest map published is in H. Doc. 608, 64th Cong., 1st 
Sess. 
19. 27-foot project is extended 2,800 feet and turing basin 
relocated under authority of Chief of Engineers. 
20. Latest published map is in H. Doc. 2053, 64th Cong., 2d 
Sess. 
936

DETROIT, MICH., DISTRICT 
FEATURES OF EXISTING PROJECT 
Project 
Datum Planes 
Used by Above Mean 
Length Miles Upbound Water Level 
of from or Down- Project Project at Father 
Channel Mouth of bound Width Depth Point, Quebec Year 
Name of Channel (Feet) River Vessels (Feet) (Feet) (Feet) Complete 
DETROIT RIVER, MICH. (See Section 7 of Text) 
Channel North of Belle Isle1 ,2 
Channel at Heat of Detroit 
River 
Miscellaneous Shoals and 
Obstructions, Belle Isle 
to Fighting Island Channel 
Fighting Island Channel 
Ballards Reef Channel 
North of Junction with 
Livingstone Channel 
Livingstone Channel 
Upper 
Livingstone Channel, 
Lower: 
CS 260+00 to 368+87 
CS 368+87 to 492+00 
East Outer Channel 
Misc., Shoals and Obstructions, 
Detroit River to Pelee Passage 
Pelee Passage Shoal 
Amherstburg Channel: 
Upper Section, Ballards 
Reef Channel 
Middle Section 
Lower Section, Hackett Range 
West Outer Channel 
Trenton Channel: 
Wyandotte Reach 
Trenton Reach (Upper) 
Trenton Reach (Lower) 
Grosse Ile Shoal 
Channel at Foot of 
Lake Huron 
Channel North of Blue 
Water Bridge 
Port Huron to Stag Island 
Stag Island to St. Clair 
(Including Widening at 
Upper and Lower Ends 
of Stag Island) 
St. Clair to Russell Island 
Russell Island to Southeast 
Bend 
Southeast Bend CS 324+00 
to 250+00 
Cutoff Channel 
North Channel Outlet 
38,000 
44,500 
24,800 
12,200 
26,000 
10,887 
12,313 
42,000 
30 Both 
32 Both 
25 
17 
Both 
Both 
12 Both 
10 Down 
5 
- 
200 
800 
800 
600 
450 
Down 450,800 
Both 800-1,200 
Both 1,200 
- Both 
Both 
6,500 
12,000 
24,000 
21,000 
31,500 
5,100 
20,500 
600 
10 
17 
14 
Up 
Up 
Up 
Down 
Local 
Local 
Local 
Local 
- 28.5-29.53 
29.5 
600 
600 
600 
800 
300 
300 
250-300 
ST. CLAIR RIVER, MICH. (See Section 30 of Text) 
26,500 
4,100 
38,000 
37,600 
77,000 
20,600 
7,400 
30,300 
8,000 
44 Both 800 
39 Both 800 
38 Both 1,000-1,400 
31 Both 900-1,000 
24 Both 1,000 
11 Both 700-1,000 
5 
- 
Both 
Both 
700 
700 
- Small Craft 100 
937 
TABLE 30-C 
21.0 571.3 1964 
28.5 
28.5 
28.5 
28.5 
27.7 
29.0 
29.0 
28.5 
1964 
1964 
1962 
1963 
1964 
1961 
1961 
1964 
1964 
1960 
1960 
1960 
1929 
19646 
1964 
1941 
1904 
27.5 
21-27.54 
21-28.5 s 
22.0 
37.0 
28.0 
28.0 
20.0 
571.5-570.9 
570.9-570.3 
569.8 
569.8 
569.8-568.6 
568.6 
568.6 
568.6 
568.6 
568.6 
569.8-569.5 
569.5-568.9 
568.9-568.6 
568.6 
569.9-569.7 
569.7-569.6 
569.6-568.8 
569.8 
576.8-576.5 
576.4-576.1 
576.1-574.9 
574.9-573.8 
573.8-572.4 
572.4-572.1 
572.1-572.0 
572.1-571.7 
571.7 
30.0 
30.0 
27.4 
27.3 
27.3 
27.2 
27.1 
27.1 
10.0 
1961 
1962 
1961 
1962 
1962 
1962 
1962 
1962

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
FEATURES OF EXISTING PROJECT 
1. This is a Side Channel. 
2. Extends from Deep Water Near Windmill Point to a Point 
Opposite Fairview Slip, about 3,000 Feet. 
3. Project Depth 29.5 Feet over Rock Shoals and 28.5 Feet 
over other than Rock Shoals. 
TABLE 30-D 
4. Project Depth 21 Feet in Easterly 300-Foot Width of 
Channel and 27.5 Feet in Westerly 300-Foot Width. 
5. Project Depth 21 Feet in Easterly 300-Foot Width of 
Channel and 28.5 Feet in Westerly 300-Foot Width. 
6. Project Complete Except for Work Authorized by River 
and Harbor Act of 1950. 
ST. MARYS RIVER, MICH.: EXISTING PROJECT 
(See Section 32 of Text) 
Lock Davis Sabin MacArthur New Poe 
Miles Above Mouth 47 47 47 47 
Clear Width of Chamber Feet 80 80 80 110 
Length Between Gate Quoine Feet 1,350 1,350 800 1,200 
Lift Feet 21.7 21.7 21.7 21.7 
Depth Over Upper Breast Wall1 Feet 24.3 24.3 31 32 
Depth Over Lower Breast Walls Feet 23.1 23.1 31 32 
Foundation Rock Rock Rock Rock 
Type of Construction Concrete Concrete Concrete Concrete 
Estimated Cost $6,200,0002 $3,275,0003 $12,909,440 $39,000,000 
Actual Cost $2,200,0005 $1,750,0006 $12,718,8064,7 $34,813,066 
Completed (Open to Commerce) Oct. 21, 1914 Sept. 18, 1919 July 11, 1943 June 26, 1969 
Emergency Dam for South Canal North Canal 
Miles Above Mouth 47 47 
Estimated Cost 9 $300,000 
Type Steel Stoplogs Recessed Steel Stoplogs Recessed 
Into Lock Masonry Into Lock Masonry 
Cost, Completed $169,2248 
Year Completed 1943 1922 (Modified 1963) 
1. At low water datum 599.5 above and 577.8 below. 
2. Includes cost of North Canal. 
3. Includes cost of canal excavations to provide necessary 
approaches to lock, canal walls, piers, and emergency dam. 
4. Excludes cost of deepening and enlarging South Canal, 
$1,653,378. 
5. Excludes cost of North Canal, $2,572,611. 
6. Excludes cost of canal excavations to provide necessary 
approaches to lock, canal walls, piers, and emergency dam, 
$662,919. 
7. Excluding cost of lower guard gates which were never 
installed. 
8. Including engineering office, and inspection. 
9. Not separable from cost of locks. 
Note: Limiting draft to locks is determined by depth over 
breast walls. 
938 
TABLE 30-C (Cont'd)

DETROIT, MICH., DISTRICT 
RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 38 of Text) 
Date Survey Conducted 
April 1970 
April 1970 
August 1969 
Bay Port Harbor, Mich. 
Belle River, Mich. 
Caseville, Mich. 
Channels in the Straits of 
Mackinac, Mich. 
Cheboygan, Mich. 
Harrisville Harbor, Mich. 
Leland Harbor, Mich. 
Petoskey Harbor, Mich. 
Pine River, Mich. 
Port Austin Harbor, Mich. 
Portage Lake Harbor, Mich. 
Sebewaing River, Mich. 
St. James Harbor, Mich. 
Traverse City Harbor, Mich. 
August 1969 
July 1969 
July 1969 
July 1969 
March 1970 
August 1969 
July 1969 
September 1969 
March 1970 
August 1969 
August 1969 
939 
TABLE 30-E 
Project

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 30-F OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Arcadia, Mich. 1920 $ - $ 63,362 
Bay Port, Mich. 1968 93,597 2,929 
Belle River, Marine City, Mich. 1907 24,301 4,394 
Caseville, Mich.1 1966 293,657 7,772 
Channels in the Straits of Mackinac, Mich. 1964 2,832,629 33,514 
Cheboygan, Mich. 1969 504,236 330,343 
Cross Village, Mich. 1967 - - 
Forestville, Mich. 1969 - 
Hammon Bay, Mich.2 1967 925,967 1,843 
Harrisville, Mich.3 1965 1,444,259 30,704 
Leland, Mich.4 1968 672,950 133,475 
Lexington, Mich. 1966 
Mackinac Island Harbor, Mich. 1969 229,085 58,398 
Mackinaw City Harbor, Mich. 1969 
Maumee River Above Toledo, Ohio 1873 7,000 
Petoskey, Mich. 1962 118,239 123,082 
Pine River, St. Clair City, Mich. 1907 13,647 5,461 
Port Austin, Mich. s 1966 956,234 35,864 
Portage Lake, Mich. 1969 256,129 749,645 
Put-In-Bay, Ohio 1951 51,747 6,918 
Rogers City 1926 5,666 226 
Sebewaing River, Mich. 1969 50,573 256,609 
St. James, Beaver Island, Mich.6 1957 41,671 9,886 
St. Joseph River, Mich. 1923 4,555 19,185 
Tawas Bay Harbor, Mich. 1969 
Traverse City, Mich.7 1967 369,557 27,005 
West Harbor, Ohio 1966 
1. Excludes contributed funds of $293,657. 
2. Excludes contributed funds of $89,400. 
3. Excludes contributed funds of $129,500 
4. Excludes contributed funds of $354,139 and major 
rehabilation funds of $70,678. 
5. Excludes contributed funds of $172,100. 
6. Excludes contributed funds of $7,500. 
7. Excludes contributed funds of $121,000. 
940

DETROIT, MICH., DISTRICT 
TABLE 30-G OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Battle Creek, Kalamazoo River, Mich.5 1968 $ 4,435,826 $ - 
Grand River, Grandville, Mich.4 1966 
Mount Clemens, Clinton River, Mich. 1 1953 1,136,008 
Ottawa, Ohio4 1967 
Red Run, Clinton River, Mich.1 1956 1,311,384 
Reno Beach-Howard Farms Area, 
Lucas County, Ohio4 1953 4,467 
Upper River Rouge, Mich.6 1968 7,935 
1. Completed. 5. Awaiting items of local cooperation. 
2. Includes $202,996 contributed funds. 6. Planning indefinitely suspended due to lack of local 
3. Includes $360,966 contributed funds. cooperation. 
4. Awaiting appropriation of funds. 7. Includes $108,242 contributed funds. 
TABLE 30-H COMPLETED FLOOD PLAIN STUDIES 
(See Section 52 of Text) 
Location Requesting Agency Date Published Federal Cost 
Farmington, Mich. City of Farmington February 1963 $11,000 
Clinton River, Mich.-Main Branch Macomb County October 1964 25,200 
Clinton River, Mich.-North Branch Macomb County October 1964 24,000 
Clinton River, Mich.-Middle Branch Macomb County October 1965 30,000 
River Rouge, Mich.-Main Branch Southeastern Mich. January 1967 51,700 
Council of Government 
Red Cedar River, Mich. Tri-County Regional March 1968 32,606 
Planning Commission 
Ottawa River, Lima Area, Ohio Maumee Watershed June 1967 41,000 
Conservancy District 
Grand River, Ingham and Tri-County Regional March 1969 37,000 
Eaton County, Mich. Planning Commission 
Auglaize River at Wapakoneta, Ohio Maumee Watershed May 1968 26,700 
Conservancy District 
Lookingglass River, Clinton County, Tri-County Regional December 1960 40,000 
Mich. Planning Commission 
Grand River at Lansing, Mich. Tri-County Regional April 1970 72,000 
Planning Commission 
941 
451-584 0-72-60

BUFFALO, N.Y., DISTRICT* 
The district comprises a portion of northeastern Lawrence River, with their tributary drainage basins 
Ohio, northwestern Pennsylvania, and western and from and including Sandusky Bay, Ohio, to innorthern 
New York, embracing U.S. waters of Lake ternational boundary line east of Frontier, N.Y. 
Erie, exclusive of western end, Lake Ontario, and St. 
IMPROVEMENTS 
Navigation 
Aquatic Plant Control ....................... 
Ashtabula Harbor, Ohio ....................... 
Black Rock Channel and Tonawanda 
Harbor, N. Y ...................................... 
Buffalo Harbor, N. Y. ...................... 
Cleveland Harbor, Ohio ..................... 
Conneaut Harbor, Ohio .................. 
Dunkirk Harbor, N. Y .......................... 
Erie Harbor, Pa .................................. 
Fairport Harbor, Ohio ...................... 
Great Sodus Bay Harbor, N. Y. ........... 
Huron Harbor, Ohio ............... .......... 
Irondequoit Bay Harbor, N. Y ....... 
Little Sodus Bay Harbor, N. Y ........... 
Lorain Harbor, Ohio ........................ 
Oak Orchard Harbor, N. Y. ................. 
Ogdensburg Harbor, N. Y. .................. 
Oswego Harbor, N. Y. ....................... 
Rochester Harbor, N. Y ....................... 
Rocky River Harbor, Ohio ................... 
Sandusky Harbor, Ohio ..................... 
Vermilion Harbor, Ohio ..................... 
Reconnaissance and condition surveys .. 
Other authorized navigation projects .... 
Navigation work under special 
authorization ....................................... 
Page 
943 25. 
944 26. 
27. 
944 
945 
946 
948
949 28. 
949 29. 
950 3310.. 
951 
952 32. 
952
2 33. 
953 
954 
35. 
954 
955 36. 
955 
956 38. 
957 
957 
957 
39. 
957 40. 
Beach Erosion Control Page 
Hamlin Beach State Park, N. Y. ....... 958 
Presque Isle Peninsula, Erie, Pa. ........... 958 
Authorized beach erosion control 
projects .......................................... 958 
Flood Control 
Eastlake, Ohio, Chagrin River .............. 958 
Fremont, Ohio, Sandusky River ........... 959 
Ithaca, N. Y., Cayuga Inlet ................ 959 
Lackawanna, N. Y., Smokes Creek ...... 960 
Little River and Cayuga Creek, 
Cayuga Island, N. Y. ....................... 960 
Mt. Morris Reservoir, N. Y., Genesee 
River ....................................... 961 
Red Creek, N. Y ................................ 961 
Wellsville, N. Y., Genesee River .......... 961 
Inspection of completed flood control 
projects ........................................ 962 
Other authorized flood control projects 962 
Flood control work under special 
authorization .............................. ......... 962 
General Investigations 
Surveys ........................................ 962 
Collection and study of basic data ....... 962 
NAVIGATION 
1. AQUATIC PLANT CONTROL 
(Section 302 of 1965 River and Harbor Act) 
Location. Seneca, Cayuga and Oneida Lakes, New 
York, (See Lake Survey Charts 184 and 187). 
Existing project. Provides for study of economic 
justification for control and progressive eradication of 
water-hyacinth, alligator weed, Eurasian water milfoil, 
and other obnoxious plant growths from navigable 
waters, tributary streams, connecting channels, and 
other allied waters of the United States, in combined 
interests of navigation, flood control, drainage, agriculture, 
fish and wildlife, conservation, public health, 
and related purposes, including continued research for 
development of most effective and economic control 
measures in cooperation with other Federal and State 
agencies in accordance with report of Chief of 
Engineers, House Doc. 37, 85th Cong., 1st Session. 
Project was authorized by Section 302, 1965 River and 
Harbor Act (H. Doc. 251,89th Cong., 1st Session). The 
act provides that research and planning costs shall be 
borne fully by the United States. 
Local cooperation. Local interests must agree to hold 
the United States free from damages that may occur 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
943 
1. 
2. 
3. 
4. 
5. 
6. 
7. 
8. 
9. 
10. 
11. 
12. 
13. 
14. 
15. 
16. 
17. 
18. 
19. 
20. 
21. 
22. 
23. 
24.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
from operations performed in connection with this 
project, and participate to extent of 30 percent of cost of 
program. A statement of willingness to provide local 
cooperation will be requested if work is found to be 
economically justifiable. 
Operations and results during fiscal year. Preliminary 
reconnaissance of Seneca Lake was continued to 
determine the needs and justification for further 
detailed planning. 
Condition at end of fiscal year. Preliminary reconnaissance 
was continued and is 25 percent completed. 
2. ASHTABULA HARBOR, OHIO 
Location. On south shore of Lake Erie, at mouth of 
Ashtabula River, 59 miles easterly from Cleveland, 
Ohio. (See Lake Survey Chart 342.) 
Previous projects. For details see page 1963 of Annual 
Report for 1915, and page 1593 of Annual Report for 
1938. 
Existing project. For description see pages 1297-99 of 
Annual Report for 1966. Actual costs for new work for 
completed portion of project were $11,115,147. Removal 
of 250 feet of inner breakwater as authorized by 
1937 act, at an estimated cost of $128,000 (July 1954) 
and deepening triangular-shaped harbor area adjacent 
thereto, as authorized by 1960 act, at estimated cost of 
$427,000 (Feb. 1961), are deferred for restudy and are 
excluded from foregoing estimate. Non-Federal costs of 
$5,696,000 were incurred for construction of access 
roads, docks, storage and handling facilities and 
dockside dredging. See Table 31-B for authorizing 
legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. There are 27 piers and wharves, 
two are owned by city of Ashtabula and Coast Guard. 
Twenty-one facilities are along banks of Ashtabula 
River and six are on south side of outer harbor. 
Twenty-two terminals have railroad connections and 
15 mechanical-handling facilities. Facilities are considered 
adequate for existing commerce. (See Port 
Series No. 42, revised 1960, Corps of Engineers.) 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government plant and hired labor cost $20, 
685. U. S. hopper dredge Hoffman removed 142,966 
cubic yards, bin measure, of shoaled material over an 
area of approximately 130,000 square yards of the 
outer harbor, lower river entrance channel and the 
Ashtabula river channel to project depths of 28, 27 and 
18 feet at a cost of $63,283. U. S. derrick boat Tonawanda 
repaired approximately 200 l.f. of the west breakwater, 
rubblemound construction, at a cost of $107,489. 
Snagging and clearing in project channels by Government 
plant and hired labor cost $5,335. 
Condition at end of fiscal year. Existing project is about 
95 percent complete. West breakwater was completed 
in 1915 except 580 feet of inner end which was 
completed in 1923, and 600 feet of outer end which was 
completed in 1935. East breakwater was completed in 
1915; 800 feet of westerly end was removed and a 
lakeward extension of 700 feet was completed in 1935. 
Old inner east breakwater 1,200 feet long was 
completed in 1909, and westerly 600 feet were removed 
in 1913 and 350 feet in 1935. The 18- and 16-foot 
sections of river channel and turning basin were 
deepened in 1939. A 25-foot deep approach channel 
through east outer harbor to easterly docks and a 
turning basin were completed in 1960. Deepening of 
this area to 28 feet, as authorized by 1965 act, was 
initiated in July 1967 and completed in June 1968. 
Deepening upper 1,550 feet of river channel to 16 feet 
was completed in July 1960. Deepening 29-foot 
entrance channel, 28-foot channel through outer 
harbor, 27-foot approach channel to Penn Central 
Co's. slip, 27-foot channel in Ashtabula River to a 
point 2,000 feet upstream from its mouth, and 22-foot 
areas in east outer harbor, as authorized by the 1960 
act, was initiated in May 1962 and completed in June 
1963. Harbor structures require repairs. Portions of 
both east and west breakwaters, rubblemound construction, 
where slope stone has pulled away, core stone 
has washed away, and deck stones have dropped, 
require major repairs. East breakwater light foundation 
tilted due to displacement of rubblemound 
protection and needs repairs. Work remaining to 
complete project consists of removal of 250 feet of inner 
breakwater, as authorized by 1937 act which is to be 
restudied and deepening triangular-shaped area adjacent 
thereto as authorized by 1960 act which is also to 
be restudied. Controlling depth is 28 feet in entrance 
channel, west- and east- outer harbors and 23 feet in 
remaining portions of outer harbor, 27 feet in approach 
channel to Penn Central Co's. dock and lower river 
entrance channel, 17 feet in Ashtabula River channel 
to upper car ferry slip and 16 feet up to and including 
turning basin. Costs of existing project were $11,115, 
147 (including $536,648 public works funds) for new 
work and $3,346,393 for maintenance, a total of $14, 
461,540. 
3. BLACK ROCK CHANNEL AND 
TONAWANDA HARBOR, N. Y. 
Location. Improveme nt is essentially that of upper 
13.5 miles of Niagara River from its head at Lake Erie, 
Buffalo, N.Y., to and including Tonawanda Harbor, 
N.Y. It comprises improvements formerly designated 
by three titles; viz, Lake Erie entrance to Black Rock 
Harbor and Erie Basin, N.Y., Black Rock Harbor and 
Channel, N.Y., and Tonawanda Harbor and Niagara 
River, N.Y. (See Lake Survey Chart 312.) 
Previous projects. For details see items 5 and 7, page 
1970 of Annual Report for 1915, and page 1612 of 
Annual Report for 1938. 
Existing project. For description of existing project and 
Federally owned Black Rock ship lock, see page 1548 of 
Annual Report for 1962. Cost estimate (1961) for new 
work is $10,451,000. Improvement of guide pier at 
Black Rock lock, as authorized by 1935 act, is 
considered inactive and excluded from foregoing cost 
estimate. Estimated cost (1954) of this portion is $931, 
000. The 1954 act which authorized enlarging of 
944

BUFFALO, N. Y., DISTRICT 
existing 21-foot turning basin and deepening lower 1, 
500 feet of Tonawanda inner harbor from 16 to 21 feet 
is to be restudied and excluded from foregoing cost 
estimate. Estimated cost (1961) of this portion is $339, 
000. Non-Federal costs are estimated at $1,540,000 for 
costs incurred by New York State for construction of 
Erie Basin and protecting breakwater, construction, 
and extension of Bird Island pier, and by other local 
interests for relocation of utilities. See Table 31-B for 
authorizing legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. Six facilities are along upstream 
end of channel. Below Black Rock lock and at 
Tonawanda Harbor there are 19 privately owned 
terminals. There are two State-owned barge canal 
terminals at Tonawanda, N.Y., and several marine 
service and supply docks for recreational and other 
small craft. The Corps owns a wharf adjacent to Black 
Rock lock which is private. Eight terminals have 
railroad connections and six mechanical-handling 
facilities. Facilities considered adequate for existing 
commerce. (Port Series No. 41, revised 1960, Corps of 
Engineers.) 
Operations and results during fiscalyear. Maintenance: U. 
S. hopper dredge Lyman removed 94,725 cubic yards, 
bin measure of shoaled material from Black Rock 
Canal, and Niagara River Channel, for restoration of 
project depth of 21 feet. Repairs to approximately 200 
linear feet of Bird Island pier were made by Government 
plant and hired labor. 
Operation and care (Black Rock lock): Lock was in 
continuous operation 318 days and closed for underwater 
cleaning and repairs March 1 through April 
16, 1970. Ordinary maintenance and repair of structures 
and grounds were accomplished throughout year 
by Government plant and hired labor. 
Total costs of $449,144 were distributed as follows: 
operation and care: operation of lock, $125,100; 
ordinary maintenance and repair, $82,900; lock, 
guards, and maintenance of grounds, $69,600; miscellaneous 
inspection and condition surveys, $30,000. 
Maintenance (Repair and dredging) (hired labor): 
removal of shoals from project channel, $86,800; 
snagging and clearing in project channels, $22,900; 
and repairs to Bird Island pier, $31,844. 
Condition at end of fiscal year. Existing project is about 
89 percent complete. Channel from Buffalo Harbor 
north entrance to opposite Sixth Avenue, North 
Tonawanda, is complete. Different sections of this 
channel were completed to project depth as follows: 
Lake Erie section in 1909; Black Rock Canal section in 
1915; Niagara River section from lock to deep water 
pool above Tonawanda, in 1913; and Tonawanda 
section, including turning basin, 1921. Channel was 
further widened as follows: Triangular area at Lake 
Erie entrance to canal was completed in 1922 and 
transferred from Buffalo Harbor project in 1945; Lake 
Erie section was widened at bend opposite foot of 
Georgia Street, Buffalo, in 1924; Black Rock Canal 
section, just south of International Bridge at Buffalo, in 
1928, and opposite foot of Maryland Street, Buffalo, in 
1930; and Niagara River section near westerly end of 
Rattlesnake Island shoal in 1928. Rock shoals extending 
above a depth of 21.4 feet were removed from 
Lake Erie entrance to canal and in canal south of Ferry 
Street Bridge, in 1937. Rock shoals extending above a 
depth of 22 feet were removed from Lake Erie entrance 
to canal, in Black Rock Canal, and in Niagara River 
portion of canal in 1948-49. Widening Lake Erie 
entrance to canal was completed in 1958. Tonawanda 
Creek Channel was completed in 1902. Tonawanda 
Inner Harbor Channel was completed in 1904. 
Enlargement of Tonawanda turning basin and extension 
of Bird Island pier were completed in 1936. 
Lock, including wing walls and retaining walls above 
lock, was completed in 1914, and 100-foot east wing 
wall extension in 1927. Guide pier connecting with 
west lower wing wall was completed in 1916, except for 
200-foot northerly extension and construction of 
concrete platform in the angle. Upstream 300 linear 
feet of lower west guide pier were repaired 1951-59. 
Lock-operating houses were completed in 1924. Work 
remaining to complete project is improvement and 
extension of guide pier as authorized by 1935 River 
and Harbor Act, which is considered inactive, and 
deepening lower 1,500 feet of Tonawanda Inner 
Harbor as authorized by 1954 River and Harbor Act, 
which is to be restudied. All structures are in poor 
condition. Bird Island pier is badly deteriorated and 
requires considerable annual maintenance. Several 
sections of pier fail yearly, requiring removal of stone 
and debris from channel and repair of structure. 
Operating equipment and controls for Black Rock lock 
are antiquated, innefficient, and require substantial 
repairs periodically. East channel face of lock wall was 
repaired in 1953, and west channel face in 1954. Upper 
wing wall of lock has shifted laterally about 2 feet at 
maximum point, and concrete superstructure on lower 
guide pier is badly cracked, indicating a possible failure 
of the timber crib. Controlling depths at low-water 
datum are: Black Rock Channel 21 feet, 20 feet in 
Niagara River section of channel and in Tonawanda 
turning basin, Tonawanda Inner Harbor 14 feet, and 
Tonawanda Creek Channel 12 feet. Costs of existing 
project were $10,457,093 (including $1,760,000 
emergency relief funds and $6,000 expended for 
deferred portion of project) for new work; $3,814,797 
for maintenance $6,885,830 for operating and care; a 
total of $21,157,720. In addition, $1,356,007 expended 
between July 9, 1914, and June 30, 1935, on operation 
and care of works of improvement under provisions of 
permanent indefinite appropriation for such purposes. 
4. BUFFALO HARBOR, N.Y. 
Location. At eastern end of Lake Erie, at head of 
Niagara River, 176 miles easterly from Cleveland, 
Ohio. (See Lake Survey Charts 3 and 314.) 
Previous projects. For details see page 1967 of Annual 
Report for 1915 and page 1606 of Annual Report for 
1938. 
Existing project. For description see page 1368 of 
Annual Report for 1963. New work for completed 
945

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
project cost $18,837,601. Estimated non-Federal costs 
were $9,188,000 for deepening, widening, and improving 
Buffalo River and ship canal, constructing 
piers, retaining walls, and dikes and performing 
dockside dredging. See Table 31-B for authorizing 
legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. There are 53 wharves and piers of 
which 3 piers, owned by Niagara Frontier Port 
Authority, and 9 privately owned and operated 
facilities are all on outer harbor and along sides of 
Lackawanna and Union ship canal, 6 are along banks 
of Buffalo ship canal, and 35 along Buffalo River, 
Coast Guard facilities are at mouth of Buffalo River 
along left bank. City of Buffalo owns a slip on right 
bank of Buffalo River just south of Michigan Avenue 
Bridge for mooring city fireboat. Forty-one terminals 
have railroad connections and 28 mechanical-handling 
facilities. Facilities considered adequate for existing 
commerce. (See Port Series No. 41, revised 1960, Corps 
of Engineers.) 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government plant and hired labor cost $59,091. 
U. S. hopper dredge Lyman removed 483,747 cubic 
yards, bin measure, of shoaled material over an area of 
about 20,000 square yards of south entrance channel 
and 350,000 square yards in 23-, 27-, 28-, and 29-foot 
project depth areas of outer harbor for restoration of 
improved depths at a cost of $236,337. Snagging and 
clearing in pro ject channels by Government plant and 
hired labor cost $55,917. U. S. derrick boat McCauley 
repaired about 500 linear feet of the old north and 
south breakwaters, rubblemound construction, at a cost 
of $134,485. Maintenance dredging, Buffalo River and 
ship canal, was accomplished by contract, using a 
clamshell bucket, removed 116,317 cubic yards of 
material at a cost of $215,966. Pilot Program: 
Sampling and analyzing water and bottom materials, 
foundation exploration at site of proposed test disposal 
areas, preparation of plans and specifications for test 
disposal area number 2 and handling of dredged 
materials (disposal in diked area) were done at a cost of 
$423,953. 
Condition at end of fiscal year. Existing project is 
complete. Stony Point breakwater was completed in 
1899, a 1,000-foot extension was completed in 1914, 1, 
200 feet of shore end were sold to Lackawanna Steel 
Co. in 1918, and another 1,000-foot extension completed 
in 1935. South breakwater was completed in 
1903, and a 300-foot extension completed in 1935. 
North breakwater was completed in 1901 and old 
breakwater in 1893. South pier was completed in 1869 
and rebuilt in 1962. Removal of three shoals to 27 feet, 
on direct approach to south entrance channel was 
completed in 1954. Deepening to 25 feet in southerly 
part of outer harbor was completed in 1956. During 
1955 and 1956, Buffalo River Channel, Buffalo River 
entrance channel, and ship canal were deepened to 22, 
23, and 22 feet, respectively. Deepening 23-foot project 
area in outer harbor was completed in 1956 except for 
strips 50 feet wide along harbor line and 180 feet wide 
between Merchants Refrigerating Co.'s piers and south 
end of city dike. Widening Buffalo River Channel at 
Ohio Street Bridge was completed in July 1959. 
Deepening north entrance channel to 25 feet in earth 
and 26 feet in rock, removal of 1,000 feet of old 
breakwater, widening southerly portion of Buffalo 
River entrance channel, relocation of Coast Guard 
facilities and construction of a detached breakwater, all 
as authorized by 1945 act, were completed in 1962. 
Removal of shoals and deepening of approach to south 
entrance, south entrance channel, and southerly part of 
outer harbor, all as authorized by 1960 act, were 
initiated in June 1962 and completed in May 1964. 
Deepening 27-foot project area of north outer harbor 
including the 50- and 180-foot wide strips along harbor 
line as authorized by 1962 act, was initiated in July 
1964 and completed in September 1965. Repairs to 650 
linear feet of superstructure of old breakwater were 
completed in August 1965 under minor rehabilitation 
program. Harbor structures are generally in good 
condition except at various points of south breakwater 
completed in 1902 and old breakwater completed in 
1889, where slope stone on lakeside has been displaced. 
Repair of collapsed 1,400-foot long south pier was 
completed in May 1962. Controlling depth in northerly 
part of outer harbor is 23 feet; remainder of north 
outer harbor is 27 feet; in north entrance channel is 25 
feet; in south entrance channel, and southerly outer 
harbor is 27 feet; 22 feet in Buffalo River entrance 
channel, Buffalo River, and Buffalo ship canal; all at 
low-water datum. Costs of existing project were $18, 
837,601 (including $655,500 public works funds) for 
new work, $13,608,858 for maintenance and $295,457 
for rehabilitation, a total of $32,741,916. 
5. CLEVELAND HARBOR, OHIO 
Location. On south shore of Lake Erie, at mouth of 
Cuyahoga River, 176 miles westerly from Buffalo, N. 
Y. (See Lake Survey Chart 354.) 
Previous projects. For details see page 1962, Annual 
Report for 1915, and page 1585, Annual Report for 
1938. 
Existing project. For description see page 1269 of 
Annual Report for 1967. Estimated Federal cost of new 
work is $39,148,400 (July 1970). Remaining work 
authorized by 1946 River and Harbor Act consisting of 
widening and deepening right bank of Cuyahoga River 
at downstream end of Cut 4 is considered inactive and 
excluded from foregoing cost estimate. Estimated 
Federal cost (1966) of this portion is $85,600 and non- 
Federal costs are estimated at $5,000,000 (July 1966). 
Non-Federal cost estimate is $20,805,000 (July 1970) 
for lands, easements, and rights-of-way, participation 
in replacement of bridges obstructive to navigation, 
removal of other bridges, construction of bulkheads, 
relocation of utilities and dockside dredging. See Table 
31-B for authorizing legislation. 
Local cooperation. City of Cleveland has not acquired 
the necessary lands for completion of widening 
Cuyahoga River at downstream portion of Cut No. 4 as 
946

BUFFALO, N. Y., DISTRICT 
a portion of the project modification authorized by 
1946 act. This remaining work is classified inactive. All 
other conditions fully complied with. 
Terminal facilities. There are 81 piers and wharves, of 
which five are owned by city of Cleveland and leased to 
commercial interests. Seventeen are on outer harbor, 
14 on banks of Old River and remaining 50 along 
deep-draft section of Cuyahoga River. Forty-nine 
terminals have railroad connections and 48 mechanicalhandling 
facilities. The Corps owns a wharf at 
foot of East 9th Street. Facilities considered adequate 
for existing commerce. (See Port Series No. 43, revised 
1960, Corps of Engineer.) 
Operations and results during fiscal year. New work: For 
work authorized by 1958 act, preconstruction planning 
by hired labor and by concerned bridge owners, for 
replacement of bridge 19 (Erie-Lackawanna Railway) 
and bridge 32 (Baltimore and Ohio Railroad) over 
Cuyahoga and Old River channels was continued. 
Costs for work authorized by 1958 act were $29,345. 
Maintenance: Miscellaneous inspection services and 
condition surveys by Government plant and hired 
labor cost $47,555. U. S. hopper dredge Hoffman 
removed 104,204 cubic yards, bin measure, of shoaled 
material over an area of about 310,000 square yards of 
east and west outer harbor and entrance channel for 
restoration of project depths of 27, 28 and 29 feet at a 
cost of $100,003. Maintenance of Cuyahoga and Old 
River to 23-foot depth, by continuing contract, 
employing clamshell bucket dredge, continued and 
about 851,123 cubic yards, scow measure, of shoaled 
material were removed at a cost of $1,036,233. 
(Includes credit of $53,272 for dredging of illegal 
deposits.) Advance dredging in upper Cuyahoga River 
by continuing contract, employing clamshell bucket 
dredge was accomplished and about 75,000 cubic 
yards, scow measure, of shoaled material were removed 
to about 26 feet below low-water datum at a cost of $90, 
314. Snagging and clearing in project channels by 
Government plant and hired labor cost $148. Repairs 
to approximately 500 linear feet of east and west 
breakwaters by U. S. derrick boats Tonawanda and B. D. 
6634 cost $239,331. Pilot Program: Sampling and 
analyzing water and bottom materials, foundation 
explorations at site of proposed test disposal area 
number 3, maintenance of existing alternate disposal 
areas (stone dike) in the east outer harbor and pumpout 
costs for the disposal of 926,123 c.y. of Cuyahoga 
River dredgings into the diked area, all in connection 
with pollution studies were done at cost of $1,184,085. 
In addition, contributed funds in the amount of $99, 
847, were expended for disposal of permit dredgings in 
diked area. 
Condition at end of fiscal year. Existing project is about 
76 percent complete. River entrance channel was 
improved by construction of parallel piers 325 feet 
apart, and dredging to 25 feet deep at low-water datum 
up to Penn Central Co. bridge. Piers were completed in 
1900 and dredging in 1935. An outer harbor, about 1, 
300 acres in extent, was formed by construction of an 
aggregate length of about 30,000 feet of breakwater, 
including converging arms, completed in 1915. About 
1,770 linear feet of east breakwater and 1,000 linear 
feet of west breakwater were repaired under major 
rehabilitation program in 1962 and 1963. Structures 
are generally in good condition, except for sections of 
east breakwater where cover stone has been displaced 
and settled. Main entrance was widened to 700 feet 
and protected by converging arms extending lakeward 
from east and west breakwaters, completed in 1908. 
Outer harbor was deepened, 1933-35, to 25 feet at lowwater 
datum throughout west basin, in entrance 
channel, and over a portion of east basin adjacent to 
entrance channel. Portions of channel in Cuyahoga 
River were widened each year from 1930 to 1942 and 
in 1958. Removal of 150 feet of easterly end of west 
breakwater and construction of 400 feet of spur 
breakwater to protect gap in west breakwater shore 
arm were completed in 1935. A concrete base for a light 
tower was constructed at east end of east breakwater in 
1917 in lieu of east-end pierhead. Providing a 1,300- 
foot extension of Cuyahoga River channel to present 
project limit was authorized by 1945 River and Harbor 
Act and partially completed with Defense Plant Corp. 
funds during 1942 and remaining portion previously 
classified inactive was deleted from project by 1962 act. 
Old River to Sand Products Corp. dock was deepened 
to 23 feet in 1952. Replacement of Norfolk & Western 
Railway bridge 25 was completed April 1953. Replacement 
of Penn Central Co. bridge 8 was completed 
December 1953. Replacement of Penn Central Co. 
bridge 9 was completed June 1956 and channel in 
vicinity of structure widened during 1957. Replacement 
of Penn Central Co. bridge 1 was completed 
in January 1957. Replacement of Norfolk & Western 
Railway bridge 15 was completed in March 1959. 
Replacement of Baltimore & Ohio Railroad bridge 3 
was completed in October 1957. Widening near Penn 
Central Co. bridge 1 was completed in September 
1957. Widening near Baltimore & Ohio Railroad 
bridge 3 and in vicinity of Norfolk & Western Railway 
bridge 15 and deepening Cuyahoga River were 
completed in July 1958. Widening Cuyahoga River at 
upstream portion of Cut 4 was completed in October 
1959. Widening and deepening Cuyahoga River at 
Cut 10 were completed in April 1961. Deepening lake 
approach, entrance channel, lower portion of Cuyahoga 
River to bridge 1 and east and west basins 
(stage I of 1960 act) was completed in November 1962. 
Replacement of city of Cleveland highway bridge 33 
was initiated in August 1963 and completed in June 
1965. Widening portion of Cut 14 in Old River vicinity 
of bridge 33 was completed in June 1965. Deepening of 
27- and 28-foot areas in east basin and 25-foot deep 
channel through remainder of east outer harbor 
including approach channel to Nicholson Terminal all 
as authorized by 1962 act was initiated in April 1964 
and completed in April 1965. Deepening of downstream 
1000-foot portion of Old River channel 
extension to 23 feet, as authorized by Section 107 of 
947

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
1960 River and Harbor Act, was initiated in April 1968 
and completed in August 1968. Work remaining to 
complete existing project consists of: 1958 
act-completion of preconstruction planning for and 
replacement of bridges 19 and 32, and widening 
Cuyahoga and Old River channels; 1960 act-stage II 
consisting of deepening of remainder of Cuyahoga 
River from bridge I to and including Old River which 
will be accomplished with similar work authorized by 
1958 act; section 107 of 1960 River and Harbor 
Act-stage II consisting of deepening channel extension 
to 27 feet when Old River channel is deepened 
and completion of inactive portion of the 1946 act, 
widening Cuyahoga River at downstream end of Cut 4. 
Controlling depth in main entrance channel and 
through west basin was 28 feet and between piers at 
entrance to Cuyahoga River, 27 feet; in harbor areas of 
East Basin 28 and 27 feet, and in 500-foot wide channel 
through remainder of East Basin, 25 feet, including 
approach channel to Nicholson Terminal at easterly 
end of basin. Controlling depth in Cuyahoga River was 
23 feet; in Old River to Sand Products Corp. dock, 23 
feet; in remainder of Old River, 21 feet; and in turning 
basin, 18 feet. Costs of existing project we re $29,865, 
623 (including $616,767 public works funds) for new 
work, $33,163,532 (including $125,000 public works 
funds) for maintenance, and $464,903 for rehabilitation, 
a total of $63,494,058. In addition, $149, 
847 of contributed funds were expended for maintenance. 
Of this amount $50,000 were expended in 
fiscal years 1935 and 1936. The balance of $99,847 was 
expended during fiscal year 1970 for disposal of permit 
dredgings in diked areas. 
6. CONNEAUT HARBOR, OHIO 
Location. On south shore of Lake Erie, at mouth of 
Conneaut River, 73 miles easterly from Cleveland, 
Ohio. (See Lake Survey Chart 33.) 
Previous projects. For details see page 1964, Annual 
Report for 1915. 
Existing project. For description see page 1274 of 
Annual Report for 1967. Estimated Federal cost for 
new work is $8,258,000 (July 1970). Non-Federal cost 
for completed work authorized by 1962 act is $200,000 
(July 1970) for dockside dredging and removal of 
existing dolphins. Estimated non-Federal cost for work 
authorized by 1966 act is $2,877,000 (July 1970) 
including cash contribution of $717,000 and remainder 
for construction of service facilities. See Table 31-B for 
authorizing legislation. 
Local cooperation. River and Harbor Act of 1966 
requires local interests to: provide without cost to the 
United States all lands, easements, and rights-of-way 
required for construction and subsequent maintenance 
of the project and for aids to navigation upon the 
request of the Chief of Engineers, including suitable 
areas determined by the Chief of Engineers to be 
required in the general public interest for initial and 
subsequent disposal of spoil, and also necessary 
retaining dikes, bulkheads, and embankments therefor 
or the costs of such retaining works; hold and save the 
United States free from all claims for damages incident 
to the construction, operation, and maintenance of the 
improvement; provide and maintain without cost to 
the United States necessary mooring facilities and 
service areas, including a public landing with suitable 
supply facilities, a launching ramp, reservation of space 
for transient craft, parking areas, and access roads, 
open to all on equal terms in accordance with plans 
approved by the Chief of Engineers; provide without 
cost to the United States all alterations and relocations 
which may be required because of construction and 
maintenance of the improvement; contribute in cash 
50 percent of the first cost of construction of the 
navigation improvements, such contribution estimated 
at $702,000 (July 1970), to be paid either in a lump sum 
prior to construction, or in installments prior to start of 
pertinent work items, in accordance with construction 
schedules as required by the Chief of Engineers, the 
final apportionment of cost to be made after actual 
costs have been determined; make a cash contribution 
amounting to 50 percent of the incremental first cost of 
Federal construction of recreational fishing facilities, 
such contribution estimated at $15,000 (July 1970), 
subject to final adjustment after actual costs have been 
determined; provide and maintain without cost to the 
United States access facilities and parking areas with 
adequate sanitary facilities for recreational fishing; 
bear all costs of operation, maintenance, and replacement 
of the recreational fishing facilities, the 
amount involved currently being estimated at $3,500 
on an average annual basis; and, establish a competent 
and properly constituted public body empowered to 
regulate the use, growth and development of the harbor 
and recreation-oriented facilities with the understanding 
that said facilities shall be open to all on 
equal terms; and provided further that the improvement 
for navigation may be undertaken independently 
of providing public recreational fishing 
facilities whenever the required local cooperation for 
navigation has been furnished. Local interests favor 
improvement and it is expected that assurances will be 
furnished when requested. 
For other project modifications all other conditions 
of local cooperation fully complied with. 
Terminal facilities. There are seven piers and wharves. 
Six are privately owned and operated and located in 
inner harbor. Remaining facility is city owned and on 
south side of outer harbor. Six terminals have railroad 
connections and four mechanical-handling facilities. 
Facilities are considered adequate for existing commerce. 
(See Port Series No. 42, revised 1960, Corps of 
Engineers.) 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
were done by Government plant and hired labor 
at a cost of $17,380. U. S. hopper dredge Hoffman 
removed 97,226 cubic yards, bin measure, of shoaled 
material over an area of approximately 235,000 square 
yards of the Conneaut River and outer harbor to 
948

BUFFALO, N. Y., DISTRICT 
project depths of 22, 27 and 28 feet, at a cost of $52,947. 
Snagging and clearing in project channels by Government 
plant and hired labor cost $6,440. 
Condition at end of fiscal year. Existing project is 91 
percent complete. Under existing project a length of 4, 
445 feet of new west breakwater was completed in 
1916; old east breakwater, 1,050 feet long, was 
extended shoreward 800 feet (completed 1911) and 
lakeward 900 feet (completed 1923). The 1,670-foot 
shore arm to west breakwater was completed in 1934. 
Extension of west breakwater 830 feet lakeward, east 
breakwater 925 feet lakeward, and removal of lake arm 
of west breakwater were completed in 1935; 642 feet of 
old west breakwater were removed in 1916, and 
remaining 600 feet in 1925. Two piers were constructed 
at mouth of Conneaut River. Removal of west pier and 
459 feet of east pier were completed in 1934. East pier is 
now 1,008 feet long. A channel through outer harbor 
was deepened to 25 and 26 feet in 1938. Inner 1,200 
feet of west breakwater was rebuilt to its original 
elevation during 1941 to 1952 and is in fair condition. 
Repairs to 600 feet of west breakwater and 1,200 feet of 
east breakwater were completed in 1964. Deepening 
city dock approach channel to 8 feet initiated in 
September 1964 and 1,150-foot long shoreward extension 
of east breakwater initiated in July 1965 were 
completed in November 1965. Removal of 995 feet of 
east pier was initiated in November 1965 and completed 
in December 1965. Deepening inner and outer 
harbor channels as authorized by 1962 River and 
Harbor Act was initiated November 1965 and completed 
July 1967. Work remaining to complete project 
consists of construction of recreational small boat 
harbor as authorized by 1966 River and Harbor Act. 
At several places along remainder of west breakwater 
and along east breakwater, slope stone on lakeside is 
disintegrating and pulling away and deck stone is 
settling. Other harbor structures are generally in fair' 
condition. Controlling depth in channel through outer 
harbor is 26 feet at low-water datum. Costs of existing 
project were $7,541,369 (including $1,010,500 public 
works funds) for new work, $2,613,460 for maintenance 
and $651,850 for rehabilitation, a total of $10,806,679. 
7. DUNKIRK HARBOR, N.Y. 
Location. On south shore of Lake Erie, 37 miles 
southwesterly from Buffalo, N.Y. (See Lake Survey 
Chart 32.) 
Previous projects. For details see page 1966 of Annual 
Report for 1915, and page 1604 of Annual Report for 
1938. 
Existing project. For description see page 1540 of 
Annual Report for 1962. New work for completed 
project cost $418,174, excluding $11,000 contributed 
by local interests. See Table 31-B for authorizing 
legislation. 
Local cooperation. Fully complied with. Local interests 
contributed $11,000. 
Terminal facilities. Three docks are in harbor, one is 
owned by city, a yacht club dock and a privately owned 
marine service dock. Facilities considered adequate for 
existing commerce. 
Operations and results during fiscal year. Miscellaneous 
inspection services and condition surveys by Government 
plant and hired labor cost $4,396. U. S. 
hopper dredge Lyman removed 27,757 cubic yards, bin 
measure, of shoaled material over an area of approximately 
50,000 square yards of the inner and outer 
entrance channels and basin to project depths of 16 and 
17 feet, at a cost of $21,320. 
Condition at end of fiscal year. Existing project was 
completed in 1951. Project structures are generally in 
good condition. About 800 linear feet of lake side of 
west pier completed in 1921 has been reinforced with 
stone riprap, and repairs to additional areas where 
concrete superstructure cracked and settled are necessary. 
Controlling depth in outer channel is 16 feet, 
and 15 feet in inner channel, and turning basin at lowwater 
datum. Costs of existing project were $418,174 
for new work and $959,403 for maintenance, a total of 
$1,377,577. In addition, $11,000 contributed funds 
expended for new work. 
8. ERIE HARBOR, PA. 
Location. On southerly side of bay formed by Presque 
Isle Peninsula, on south shore of Lake Erie, 78 miles 
westerly from Buffalo, N.Y. (See Lake Survey Chart 
332.) 
Previous projects. For details see page 1965 of Annual 
Report for 1915 and page 1600 of Annual Report for 
1938. 
Existing project. For description see pages 1363-64 of 
Annual Report for 1963. Actual costs for new work for 
completed portion of project were $2,859,306. Extension 
of north pier portion as authorized by 1899 act 
is to be restudied and excluded from foregoing cost. 
Estimated cost (1955) of this portion is $1,071,000. 
Entire project modification authorized by 1945 River 
and Harbor Act providing for deepening channel and 
basin, both 23 feet deep, to Penn Central Company 
coal docks at westerly end of harbor, is considered 
inactive and also excluded from foregoing cost. 
Estimated cost (July 1960) of this modification is $1, 
837,000. A portion of work authorized by 1960 act, 
deepening strips adjacent to north and south piers, is to 
be restudied and also excluded from foregoing cost. 
Estimated cost (July 1962) of this portion is $78,000. 
Non-Federal costs for completed work were $51,000 for 
providing ore dock and dredging slip adjacent thereto. 
See Table 31-B for authorizing legislation. 
Local cooperation. River and Harbor Act of 1945 
authorized an approach channel 23 feet deep, including 
a turning basin, to westerly docks, required 
local interests to give assurances they will provide and 
maintain a coal dumper and slip so that full utilization 
can be made of improvement; lower waterworks intake 
949

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
line where necessary; and hold the United States free 
from damages. These conditions not complied with and 
authorized work classified inactive. All other conditions 
are fully complied with. 
Terminal facilities. Fifteen piers and wharves, of which 
11 are privately owned and operated. Erie International 
Marine Terminal No. 1 owned by Port 
Commission, city of Erie, is along main waterfront on 
south side of Presque Isle Bay and Coast Guard 
facilities are on north side. Two offshore oil docks are 
on Lake Erie. Nine terminals have railroad connections 
and eight mechanical-handling facilities. 
Facilities are considered adequate for existing commerce. 
(See Port Series No. 42, revised 1960, Corps of 
Engineers.) 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government plant and hired labor cost $11, 
763. U. S. hopper dredge Lyman removed 171,215 cubic 
yards, bin measure, of shoaled material over .75-mile of 
entrance channel and 120,000 square yards of harbor 
basin for restoration of project depths of 29 and 28 feet 
at a cost of $115,571. 
Condition at end of fiscal year. Existing project is 49 
percent complete. Breakwater and piers were completed 
in 1915. A 3,050-foot section of rubblemound 
protection work on peninsula was completed in 1921, 5, 
281 feet of steel-sheet piling protection work with stone 
facing were completed in 1930, and two experimental 
300-foot stone groins and about 1,385 feet of stoneprotection 
work at beach 2 were completed in 1943. 
Construction of 2,750 feet of stone-protection work, just 
north of Kelso groin, was completed in 1944. The 18- 
foot harbor basin was deepened in 1900. Widening and 
straightening of entrance channel was completed in 
1936. Deepening entrance channel and approach 
channel to easterly ore dock to 25 feet except for small 
triangular areas along southeasterly and southwesterly 
limits of approach channel, was completed in 1939. 
The 21-foot harbor basin was deepened in 1940. 
Widening approach channel to easterly ore dock was 
completed in August 1958. Deepening entrance channel 
to 29 feet, and approach channel and turning basin 
at easterly docks to 28 feet was completed in 1962. 
Deepening approach channel to Erie International 
Marine Terminal No. 1 to a depth of 27 feet in soft 
material and 28 feet in hard material, as authorized by 
1962 act was initiated in June 1966 and completed in 
August 1966. Harbor structures are generally in poor 
condition. Concrete superstructure of north and south 
piers completed in 1909, has disintegrated, broken, and 
dropped in various sections, due to timber-crib failure 
at these sections. In outer 200-foot section of south 
breakwater, slope stone on channel side has pulled 
away and dropped. A length of 40 linear feet of south 
pier and 1,141 linear feet of north pier was reinforced 
and repaired with steel-sheet piling and concrete. 
Approximately 1,400 linear feet of steel-sheet piling 
bulkhead with stone facing adjacent to mainland, 
Presque Isle protection works, constructed in 1930, in 
which stone facing settled was completely covered with 
sandfill as provided in shore protection project authorized 
for Presque Isle Peninsula. Work remaining to 
complete project consists of completion of deepening 
strips adjacent to north and south piers as authorized 
by 1960 act, which is to be restudied; deepening 
channel and basin at westerly end of harbor as 
authorized by 1945 act which is considered inactive 
and conditional extension of north pier as authorized 
by 1899 act which is to be restudied. There is a 
controlling depth of 29 feet at low-water datum in 
entrance channel and 28 feet in approach channel to 
the docks at easterly end of harbor, 16 feet to docks at 
westerly end, and 20 feet to public docks, foot of State 
Street. Costs of existing project were $2,859,306 for new 
work, $4,821,344 for maintenance, and $1,154 for 
rehabilitation, total of $7,681,804. In addition, $154, 
500 expended for contributed funds for maintenance. 
9. FAIRPORT HARBOR, OHIO 
Location. On south shore of Lake Erie at mouth of 
Grand River, 33 miles easterly from Cleveland, Ohio. 
(See Lake Survey Chart 346.) 
Previous projects. For details see page 1963 of Annual 
Report for 1915, and page 1590 of Annual Report for 
1938. 
Existing project. For description see page 1526 of 
Annual Report for 1962. Actual costs for new work for 
completed portion of project were $2,590,671. Entire 
project modification authorized by 1960 River and 
Harbor Act providing for deepening lake approach 
channel, 800-foot wide channel through outer harbor, 
channel in Grand River, enlargement of turning basin, 
is considered inactive and excluded from foregoing 
cost. Estimated cost (1963) of this modification is $3, 
170,000. For completed work non-Federal costs were 
$101,000 for bulkheads and dockside dredging. Estimated 
non-Federal cost of $3,821,000 (1963) is for 
lands, relocations, utility changes, dockside dredging 
and dock and bulkhead modifications for the inactive 
1960 project modification. See Table 31-B for authorizing 
legislation. 
Local cooperation. River and Harbor Act of 1927 
required local interests contribute $304,000 toward cost 
of extending breakwater 4,000 feet, and dredge 
approach channel to their proposed terminal at their 
own expense. River and Harbor Act of July 3, 1930, 
waived the condition requiring local interests to 
contribute to cost of breakwater extension. Proposed 
terminal has not been built nor required dredging been 
done. River and Harbor Act of 1960 requires local 
interests make all changes in docks, bulkheads and 
other structures;' provide and maintain depths between 
new channel limits and terminal facilities; accomplish 
utility alterations; furnish lands and rights-of-way for 
construction; and hold the United States free from 
damages. District Engineer requested Board of County 
950

BUFFALO, N. Y., DISTRICT 
Commissioners, Lake County, to furnish assurances by 
January 1, 1963. Assurances not received and authorized 
work classified inactive. All other conditions 
are fully complied with. 
Terminal facilities. Nineteen piers and wharves, all 
along banks of Grand River. One facility is owned by 
Coast Guard. Thirteen terminals have railroad connections 
and seven mechanical-handling facilities. 
Facilities considered adequate for existing commerce. 
(See Port Series No. 42, revised 1960, Corps of 
Engineers.) 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government plant and hired labor cost $26, 
589. U. S. hopper dredge Lyman removed 253,287 cubic 
yards, bin measure, of shoaled material from about 1 
mile of Grand River Channel and turning basin and 
90,000 square yards of the lake approach channel and 
outer harbor for restoration of depths of 25, 24, 21 and 
18 feet at a cost of $139,723. Snagging and clearing in 
project channels by Government plant and hired labor 
cost $3,730. 
Condition at end of fiscal year. Existing project is about 
46 percent complete. Lengths of 400 and 275 linear feet 
of east pier were repaired with steel sheet piling and 
sandfilled, in 1949 and 1958, respectively. Other end of 
structure requires extensive repairs. River entrance was 
improved by construction of an east pier completed in 
1904, and removal of old west pier and construction of 
bulkhead, completed in 1939. East breakwater was 
completed in 1931 and west breakwater in 1935. River 
channel was deepened to 21 and 24 feet and turning 
basin to 18 feet in 1939. Outer harbor was deepened to 
25 feet and river channel widened at its mouth in 1940. 
Deepening 8-foot channel in Grand River at upper end 
of and adjacent to west side of 21-foot project channel, 
was completed in 1956. Harbor structures require 
repairs. Concrete cap of several cells of cellular section 
of west breakwater requires replacement. At several 
places along remainder of west breakwater the slope 
stone has disintegrated and settled. The 6,700-foot 
long, rubblemound east breakwater, built in 1932, is in 
various stages of disrepair throughout its entire length. 
At several locations of the structure, totaling approximately 
2,000 linear feet, slope stone has disintegrated 
and settled and core stone washed out, 
leaving large areas of structure only slightly above lowwater 
datum. Work remaining to complete project 
consists of completion of preconstruction planning for, 
and deepening lake approach channel, 800-foot wide 
channel through outer harbor, channel in Grand 
River, and enlargement of turning basin, all as 
authorized by 1960 act which is considered inactive. 
Controlling depth is 25 feet in outer harbor, 23 feet in 
river channel for 3,700 feet upstream from outer end of 
east pier, thence 21 feet in river channel upstream to 
project limit, 18 feet in turning basin, and 8 feet in 
project area at upper end of Grand River. All depths 
are referred to low-water datum. Costs of existing 
project were $2,590,671 (including $187,772 public 
work funds) for new work, and $4,568,018 for maintenance, 
a total of $7,158,689. 
10. GREAT SODUS BAY HARBOR, N.Y. 
Location. On Sodus Bay, which is a nearly landlocked 
indentation on south shore of Lake Ontario, 29 miles 
westerly from Oswego, N.Y. (See Lake Survey Chart 
234.) 
Previous projects. For details see page 1972 of Annual 
Report for 1915 and page 1526 of Annual Report for 
1938. 
Existing project. For description see page 1380 of 
Annual Report for 1963. Actual costs of new work for 
completed portion of project were $249,187. Improvements 
authorized by 1962 act consisting of 
deepening lake approach channel, entrance channel, 
and inner approach channel are classified inactive. 
Estimated cost (1965) of this portion is $900,000. For 
completed work, co sts incurred by local interests are 
not available. Estimated non-Federal cost (1965) for 
work authorized by 1962 act is $380,000 for turning 
basin and dockside dredging. See Table 31-B for 
authorizing legislation. 
Local cooperation. River and Harbor Act of October 
23, 1962, requires local interests provide and maintain 
a 22-foot depth in turning basin at coal dock and in 
berthing areas at coal dock; provide adequate coalloading 
facilities; and hold the United States free from 
damages. On December 5, 1962, the District Engineer 
requested assurances be furnished. A resolution by 
town of Sodus furnishing assurances was reviewed and 
found to be incomplete and was returned November 
19, 1963. Assurances have not been received and 
authorized work has been classified inactive. All other 
conditions fully complied with. 
Terminal facilities. One coal terminal which is open to 
shippers of coal and one fish dock which is private. A 
yacht club dock and several other privately owned 
servicing and storage docks are for recreational and 
other small craft. Terminals are considered adequate 
for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government plant and hired labor cost $1,200. 
Condition at end of fiscal year. Existing project is 22 
percent complete. Structures are generally in good 
condition except for a 200-foot section of east pier, 
where superstructure has disintegrated and cracked. 
500 linear feet of west pier were reinforced with steelsheet 
piling and concrete in 1958. Lakeward end of 
west pier 550 feet long and 880 linear feet of east pier 
were reinforced with steel-sheet piling and concrete in 
1962 and 1963 under major rehabilitation program. 
Work remaining to complete project consists of 
deepening lake approach channel, entrance channel 
and inner approach channel as authorized by 1962 act, 
which is classified inactive. Controlling depths are 22 
951

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
feet in entrance channel and 20 feet in channel 
between piers. Costs of existing project were $249,187 
for new work, $1,461,843 for maintenance, and $713, 
544 for rehabilitation, a total of $2,424,574. 
11. HURON HARBOR, OHIO 
Location. On south shore of Lake Erie at mouth of 
Huron River, 47 miles westerly from Cleveland, Ohio. 
(See Lake Survey Chart 363.) 
Previous project. For details see page 1961 of Annual 
Report for 1915, and page 1576 of Annual Report for 
1938. 
Existing project. For description see page 1347 of 
Annual Report for 1963. Estimated cost of new work is 
$14,934,000 (July 1970). Estimated non-Federal costs 
of $1,820,000 (July 1970) are for required lands, 
removal of structures, utility changes and dredging 
slips all for the 1962 act, costs for fully completed work 
are not available. See Table 31-B for authorizing 
legislation. 
Local cooperation. River and Harbor Act of 1962 
requires local interests dredge areas between Federal 
improvement and terminal facilities; regulate moorings; 
furnish lands and rights-of-way for construction; 
and hold the United States free from damages. Formal 
assurances were requested from city of Huron in 
December 1962. Subsequently, the city of Huron 
requested modifications to project limits which were 
approved in May 1964. On July 7, 1964, City Manager 
of Huron was advised of approved deviation. On April 
12, 1967 City of Huron advised that the assurances of 
local cooperation can be furnished. By letter dated 
April 13, 1967, the city was informed that assurances 
will be requested upon completion of planning. All 
other conditions fully complied with. 
Terminal facilities. Twelve privately owned wharves 
and docks, seven along left bank of Huron River and 
remainder along right bank. Five terminals have 
railroad connections and four mechanical-handling 
facilities. Facilities are regarded as adequate for 
existing commerce. (See Port Series No. 42, revised 
1960, Corps of Engineers.) 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government plant and hired labor cost $15, 
442. U. S. hopper dredge Hoffman removed 114,451 
cubic yards, bin measure, of shoaled material over 50, 
000 square yards of entrance channel for restoration of 
project depth of 25 feet at a cost of $57,564. Snagging 
and clearing in project channels by Government plant 
and hired labor cost $7,144. 
Condition at end of fiscal year. Existing project is 15 
percent complete. Harbor structures are generally in 
fair condition. Throughout a length of 1,000 linear feet 
of west pier the concrete superstructure cracked and 
settled. Many sections of east breakwater, rubblemound 
construction, have settled resulting in less 
effective navigation protection. Repairs to 400 linear 
feet of west pier under minor rehabilitation program 
were initiated in August and completed in December 
1963. Controlling depth in channel is 25 feet at lowwater 
datum. Preconstruction planning for and deepening 
lake approach, entrance and river channels, 
enlarge turning basin and construction of new detached 
breakwater, as authorized by 1962 River and 
Harbor Act remain to complete project. Costs of 
existing project were $1,034,350 (including $561,262 
public works funds) for new work, $2,180,131 for 
maintenance, and $247,030 for rehabilitation, total of 
$3,461,511. 
12. IRONDEQUOIT BAY, N. Y. 
Location. On south shore of Lake Ontario, 4 miles east 
of Rochester, N. Y. at mouth of Genesee River, Monroe 
County, N. Y. (See Lake Survey Charts 2, 23 and 238.) 
Existing project. Provides for entrance channel 8 feet 
deep, an inner channel, access channel and mooring 
area, all 6 feet deep, parallel jetties, replacement of 
existing railroad bridge and removal of existing 
highway bridge. For detailed description of features see 
page 977 of Annual Report for 1969. Estimated Federal 
cost for new work is $2,550,000 (July 1970). Estimated 
non-Federal cost for new work is $1,040,000 (July 
1970) including cash contribution of $817,000 and 
remainder for lands and construction of a wharf. 
Existing project was authorized by 1958 River and 
Harbor Act (H. Doc. 332, 84th Cong. 2nd sess.). 
Local cooperation. Assurances were furnished and 
accepted by the District Engineer on August 12, 1959. 
Compliance with the assurances will be required when 
project construction is initiated. 
Terminal facilities. Facilities consist of private docks for 
recreational craft and privately owned servicing and 
storage handling facilities for recreational and other 
small craft. 
Operations and results during fiscal year. Preconstruction 
planning was continued. Design Memorandum No. 2, 
Railroad Bridge was approved on May 22, 1969. 
Condition at end of fiscalyear. Construction has not been 
initiated. The work remaining to be done consists of 
completion of preconstruction planning for and construction 
of the project. 
13. LITTLE SODUS BAY HARBOR, N.Y. 
Location. Little Sodus Bay, on south shore of Lake 
Ontario, 15 miles west of Oswego, N.Y. (See Lake 
Survey Chart 22.) 
Previous projects. For details see page 1973 of Annual 
Report for 1915, and page 1628 of Annual Report for 
1938. 
Existing project. For description see page 1378 of 
Annual Report for 1958. New work for completed 
project cost $69,066. Non-Federal costs of $6,000 were 
incurred for channel dredging. 
Local cooperation. None required. 
952

BUFFALO, N. Y., DISTRICT 
Terminal facilities. Docks for small recreational craft 
and one passenger tour boat, all are private. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government plant and hired labor cost $4,552. 
Condition at end of fiscal year. Existing project was 
completed in 1906. Structures are in good condition 
except for a 60-foot section of east pier shoreward of 
portion being repaired by contract. A 300-foot section 
of east pier and a 1,127-foot section of west pier were 
repaired during period September 1965 to July 1967 
under major rehabilitation program. Controlling 
depth in channel is 13 feet at low-water datum. Costs of 
completed project were $69,066 for new work, $951,361 
for maintenance, and $742,822 for rehabilitation, a 
total of $1,763,249. 
14. LORAIN HARBOR, OHIO 
Location. On south shore of Lake Erie at mouth of 
Black River, 28 miles westerly from Cleveland , Ohio. 
(See Lake Survey Chart 357.) 
Previous projects. For details, see page 1961 of Annual 
Report for 1915, and page 1580 of Annual Report for 
1938. 
Existing project. For description see pages 1319-22 of 
Annual Report for 1966. Estimated Federal cost of new 
work is $23,646,000 (July 1970). A portion of work 
authorized by 1960 act, dredging of 15- to 25-foot wide 
strips adjacent to the U. S.' East and West piers is 
deferred for restudy and estimated cost of $60,200 (July 
1966) is excluded from foregoing cost estimate. Total 
non-Federal cost estimate is $5,141,000 (July 1970). 
For fully completed modifications $3,000 was contributed 
by local interests toward construction of west 
breakwater shorearm. For work authorized by 1960 
act, non-Federal costs are estimated to be $5,093,000 
for lands, relocations of utilities, modifications of 
existing dock and bulkheads, construction of new 
bulkheads and dockside dredging. For work authorized 
by 1965 act local interests must make a cash contribution 
presently estimated at $45,000. See Table 31- 
B for authorizing legislation. 
Local cooperation. For work authorized by 1965 act, 
local interests must contribute $45,000. Pending 
finalization of planning for bank stabilization works, 
this contribution not received to date. For completed 
work, local interests contributed $3,000. All other 
conditions fully complied with. 
Terminal facilities. There are 19 piers and wharves, of 
which three are on outer harbor and remainder are 
along banks of Black River. Two are owned by the city. 
Ten terminals have railroad connections and 12 
mechanical-handling facilities. Facilities are considered 
adequate for existing commerce. (See Port 
Series No. 42, revised 1960, Corps of Engineers.) 
Operations and results during fiscalyear. New work-1960 
project modification: Cost for the year of preconstruction 
planning for replacement of Norfolk and 
Western Railway Company bridge was $62,370. For 
work authorized by 1965 project modification, contract 
operations for partial dredging of river channel were 
completed in September 1969 at a cost of $208,461 for 
the year. Maintenance: Miscellaneous inspection 
services and condition surveys by Government plant 
and hired labor cost $30,370. U. S. hopper dredge 
Hoffman removed 138,084 cubic yards of shoaled 
material over approximately 1.5 miles of the Black 
River channel and turning basin and 15,000 square 
yards of outer harbor for restoration of 27-, 25-, and 21- 
foot project depths at a cost of $102,600. U. S. derrick 
boat B. D. 6634 completed repairs to about 400 feet of 
east and west breakwaters, rubblemound construction, 
at a cost of $128,627. Snagging and clearing in project 
channels by Government plant and hired labor cost 
$20,131. 
Condition at end of fiscal year. Existing project is about 
56 percent complete. An outer harbor as provided by 
constructing breakwaters and pierheads completed in 
1915, except extension of west breakwater to shore, 
which was completed in 1921. A channel through outer 
harbor to entrance to Black River was deepened to 25 
feet in 1937, also a channel 16 feet deep to municipal 
pier was provided in 1936. Deepening outer harbor to 
25 feet was completed in 1946. Entrance to river was 
improved by construction of parallel piers completed in 
1909. Widening of two bends in river was completed in 
1934. River channel was deepened to 24 feet and 
upstream turning basin opposite National Tube Co. 
dock was deepened to 17 feet in 1937 and 1938. 
Upstream turning basin was widened in 1944. Deepening 
downstream turning basin in bend of Black 
River immediately upstream of Baltimore & Ohio 
Railroad coal dock to 20 feet was completed in 1951. 
Deepening upper and lower portion of Black River 
(above and below 21st Street Bridge) to 27 feet, 
entrance channel between piers 2,200 feet long to 28 
feet, an 800-foot wide lake approach channel to 29 feet, 
an irregularly shaped area in west outer harbor to 25 
feet and enlarging and deepening turning basin to 21 
feet, were initiated in May 1962 and completed in 
November 1963. Deepening remainder of outer harbor, 
triangular area vicinity of East pier, to project 
depth 28 feet was initiated in April 1966 and 
completed in June 1966. Construction of new east 
cellular steel sheet pile breakwater shorearm, 2,323 feet 
long with a 134-foot stone shore connection, was 
initiated in January 1963 and completed in October 
1963. Construction of new cellular steel sheet pile outer 
detached breakwater was initiated in August 1964 and 
completed in June 1966. Removal of 250 feet of the 
lakeward end of the East breakwater and construction 
of a new pier-head was completed in November 1965. 
Removal of shoals in lake approach channel was 
initiated in September 1966 and completed in July 
1967. Partial channel widening and bank stabilization 
at cut 1 was initiated in September 1968 and completed 
953

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
in September 1969. Protection works are generally in 
poor condition. Shoreward section of west breakwater, 
completed in 1921, has disintegrated and settled and in 
places is below low-water datum. At various locations 
on lake face of lakeward section of west breakwater, 
stones shifted leaving holes in the wall, and in many 
sections of east breakwater stones above water have 
deteriorated and shifted. Severe cracks and shifting 
have developed in superstructure of west breakwater 
pierhead. East pier, completed in 1905 was reduced in 
length from 1,875 feet to 880 feet in November 1964 by 
removal of lakeward 995 feet. Remainder of East Pier 
is in various stages of disrepair where concrete 
superstructure supported by timber cribs has cracked 
and settled. Work remaining to complete project 
consists of widening remaining portion at bends in river 
channel, including construction of bank stabilization 
works at cut 1; dredging strips adjacent to east and west 
piers (deferred for restudy); and, replacement of 
Norfolk & Western Railway Bridge, all as authorized 
by 1960 act and modified by 1965 act. Completion of 
preauthorization studies for and construction of small 
boat harbor as authorized by the Chief of Engineers on 
June 4, 1968 under authority of Section 107 of the 1960 
River and Harbor Act, also remains to be done. 
Controlling depth is 28 feet in channel through outer 
harbor, 27 feet in river channel to upper end of 
National Tube Co. dock, 16 feet in outer harbor 
channel to municipal pier, 17 and 21 feet in upstream 
turning basin opposite National Tube Co. dock, and 20 
feet in downstream turning basin upstream of Baltimore 
& Ohio Railroad coal dock all at low-water 
datum. Costs of existing project were $13,288,479 
(including $165,000 public works funds) for new work 
and $4,189,153 (including $76,300 public works funds) 
for maintenance, a total of $17,477,632. In addition, 
$3,000 contributed funds expended for new work. 
15. OAK ORCHARD HARBOR, N. Y. 
Location. On south shore of Lake Ontario at mouth of 
Oak Orchard Creek, 33 miles westerly of Rochester, N. 
Y. (See Lake Survey Chart 24). 
Previous project. For details see page 628 of Annual 
Report for 1905. 
Existing project. Project authorized by 1945 River and 
Harbor Act (H. Doc. 446, 78th Cong, 2nd sess.), 
provides for: (a) two protective jetties, west jetty 1,000 
feet long and east jetty 740 feet long; (b) an entrance 
channel between jetties about 1,600 feet long, 100 feet 
wide, 10 feet deep; (c) irregularly shaped harbor basin, 
8 feet deep; (d) 100-foot long shore protection easterly 
of shore end of east jetty; (e) removal of remains of old 
stone filled timbercribs at lakeward ends of jetties. 
Preconstruction planning underway modified authorized 
project features to include detached breakwater 
and revisions to channel alinements. Project 
depths referred to low-water datum for Lake Ontario 
which is 242.8 feet above mean water level at Father 
Point, Quebec (International Great Lakes Datum-
1955). Ordinary fluctuation of water surface are 
from 4 feet above to 0.5 foot below low-water datum 
and fluctuations due to wind are small. Estimated 
Federal cost for new work is $1,150,000 (July 1970). 
Estimated non-Federal cost for new work is $259,000 
(July 1970) including cash contribution of $170,700 
and $24,500 for recreational facilities and remainder 
for lands and construction of wharf. Existing project 
was authorized by the 1945 River and Harbor Act (H. 
Doc. 446, 78th Cong., 2nd sess.). 
Local cooperation. Fully complied with. 
Terminal facilities. There is no commercial navigation 
at Oak Orchard Harbor. Terminal facilities consist of 
private docks for recreational craft. 
Operations and results during fiscal year. New work. 
Preconstruction planning by hired labor was continued. 
Condition at end of fiscal year. Preconstruction planning 
suspended in 1947 was resumed in 1966 when State of 
New York Conservation Department expressed intention 
to cooperate and meet items of local cooperation. 
Completion of preconstruction planning 
and construction of project remain to be done to 
complete project. 
16. OGDENSBURG HARBOR, N.Y. 
Location. On south bank of St. Lawrence River, 62 
miles by water from Lake Ontario. (See Lake Survey 
Chart 14.) 
Previous projects. For details see page 1975 of Annual 
Report for 1915, and page 1635 of Annual Report for 
1938. 
Existing project. For description see page 1568 of 
Annual Report for 1962. Actual cost for new work for 
completed portion of project was $375,086. Removal of 
hard material shoals from lower basin portion of 
project as authorized by 1935 act, at an estimated cost 
of $183,000 (1954) is classified inactive. See Table 31-B 
for authorizing legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. There are 14 terminals in harbor, 
13 privately owned and 1 owned by city of Ogdensburg 
is used by large passenger vessels. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Hydroclimatic network measurements were accomplished 
by Weather Bureau at a cost of $1,172. 
Miscellaneous inspection services and condition surveys 
were made at a cost of $1,559. 
Condition at end of fiscal year. Existing project is 
complete except for inactive portion. Channels were 
deepened to 19 feet in 1913. Upper entrance channel 
was widened to 400 feet in 1920 and to 700 feet in 1935. 
Removal of elevator wharf and deepening lower basin 
was completed in 1935, except for removal of hard 
material shoals, which are considered inactive. There is 
954

BUFFALO, N. Y., DISTRICT 
a controlling depth of 18 feet in channel and 19 feet in 
lower basin, at low-water datum. Costs of existing 
project were $375,086 (including $174,549 public 
works funds) for new work, and $602,581 for maintenance, 
a total of $977,667. 
17. OSWEGO HARBOR, N.Y. 
Location. On south shore of Lake Ontario, at mouth of 
Oswego River, 59 miles easterly from Rochester, N.Y. 
(See Lake Survey Chart 225.) 
Previous projects. For details see page 1973 of Annual 
Report for 1915, and page 1630 of Annual Report for 
1938. 
Existing project. For description see pages 1383-84 of 
Annual Report for 1963. Completed portion of project 
cost $7,242,039 and non-Federal costs for completed 
work were $4,440,000 for lands, dockside dredging, 
construction of terminal, wharves and cargo handling 
facilitie s. Deepening a 200-foot wide strip along harbor 
line east of mouth of Oswego River, remaining feature 
of work authorized by the 1930 act, and deepening to 
22 feet a 150-foot wide strip along harbor line in west 
outer harbor, remaining feature of work authorized by 
1940 act, are classified as inactive. Estimated Federal 
costs for this work are $246,000 (July 1957) and $2,419, 
000 (July 1966) respectively, and estimated non- 
Federal costs are $500,000 (July 1966) for dockside 
dredging for work authorized by 1940 act. See Table 
31-B for authorizing legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. Seven piers and wharves in harbor 
and along river channel. In addition, Port of Oswego 
Authority owns two public terminals, one of which is 
west of river and includes a grain elevator and 
warehouse for miscellaneous freight. Other terminal is 
east of river and used for handling aluminum and 
general cargo. A dock owned by the State Naval 
Militia is private. State of New York owns a river 
terminal used for mooring vessels. City of Oswego owns 
shore facilities for recreational craft. Facilities considered 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government plant and hired labor cost $5,315 
and hydroclimatic network measurements in Oswego 
River Basin accomplished by Weather Bureau at a cost 
of $586. 
Condition at end of fiscal year. Existing project is 73 
percent complete. Outer west breakwater was completed 
in 1882, and originally 6,032 feet long with a 
119-foot gap near westerly end, but was reduced to 4, 
359 feet in 1931, and gap was closed in 1942. West 
arrowhead breakwater was completed in 1931, and 
east arrowhead breakwater in 1932. Old lighthouse 
pier, a part of west inner breakwater, and upper and 
lower islands in Oswego River, were removed in 1931. 
A depth of 21 feet was obtained in Oswego River to 
within 50 feet of harbor line and in outer harbor east of 
Erie-Lackawanna coal dock, except a strip about 200 
feet wide along harbor line east of river mouth, in 1932. 
Channel in Oswego River was widened to harbor lines 
in 1937. A channel, 16 feet deep and 100 feet wide, with 
a turning basin at its westerly end, was dredged in 1932 
in outer harbor west of Erie-Lackawanna coal dock. 
Channel was widened to 250 feet and deepened to 21 
feet below low-water datum in 1948. Removal of shoals 
to 25 feet in approach to entrance channel was 
completed in 1957. Contract for construction of 850- 
foot long detached breakwater at harbor entrance was 
initiated in May 1957 and completed June 1960. 
Deepening lake approach channel to 27 feet, 800-foot 
wide outer harbor channel including harbor turning 
basin to 25 feet and 1,600 feet of lower river channel to 
24 feet, all as authorized by 1962 act, was initiated in 
June 1965 and completed in November 1965. Breakwaters 
are generally in fair condition except that slope 
stone in portions of west arrowhead breakwater has 
disintegrated and settled and core stone in a 1,500-foot 
section of west arrowhead breakwater has settled in 
many places. Approximately 1,900 linear feet of 
deteriorated sections of outer west breakwater were 
repaired under minor rehabilitation program in 1962. 
A depth of 24 feet at low-water datum is available in 
lower 1,600 feet of Oswego River and a depth of 21 feet 
above that point to northline of Seneca Street. A depth 
of 25 feet is available in 800-foot wide channel through 
outer harbor and 21 feet in remaining portions of outer 
harbor east of Erie-Lackawanna coal dock, except in a 
200-foot wide strip along harbor line east of mouth of 
Oswego River which has a controlling depth of 18 feet. 
The 250-foot channel in outer harbor west of Erie- 
Lackawanna coal dock and turning basin have a 
controlling depth of 21 feet at low water datum. A 
depth of 27 feet is available in the lake approach 
channel to the entrance to the outer harbor. Completion 
of inactive portions remains to be done to 
complete project. Costs of existing project were $7,242, 
039 for new work, $1,713,269 for maintenance, and 
$307,590 for rehabilitation, total of $9,262,898. 
18. ROCHESTER HARBOR, N.Y. 
Location. On south shore of Lake Ontario, at mouth of 
Genesee River, 59 miles westerly from Oswego, N.Y. 
(See Lake Survey Chart 238.) 
Previous project. For details see page 1471 of Annual 
Report for 1915, and page 1623 of Annual Report for 
1938. 
Existing project. For description see page 1556 of 
Annual Report for 1962. Actual cost for new work for 
completed project is $2,191,514. Non-Federal costs are 
estimated at $2,260,000, all for 1960 act, for lands, 
relocation of submarine cable crossing, relocations of 
small docks and boathouses, dockside dredging, structure 
modifications, and replacement of Baltimore & 
Ohio coal loader. See Table 31-B for authorizing 
legislation. 
955

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Local cooperation. River and Harbor Act of July 14, 
1960, requires local interests provide lands and rightsof-
way for construction and maintenance, hold the 
United States free from damages, make necessary 
alterations to existing structures and utility facilities; 
strengthen east abutment of Penn Central Co. bridge; 
provide and maintain depths between channel limits 
and terminal facilities commensurate with related 
project depths; and provide adequate coal-loading and 
other terminal facilities as needed to serve prospective 
commerce. Assurances were furnished and accepted by 
District Engineer on February 24, 1961. Complied with 
except provision for replacement of coal loading 
facility. 
Terminal facilities. Rochester-Monroe County Port 
Authority owns a terminal facility at mouth of Genesee 
River. Two privately owned terminals are at upper end 
of channel. Two yacht club docks and several privately 
owned servicing and storage docks are for recreational 
and other small craft. Facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government plant and hired labor cost $14, 
817. U. S. hopper dredge Lyman removed 437,386 cubic 
yards, bin measure, of shoaled material over entire area 
of entrance channel and turning basin and about 1.5 
miles of Genesee River Channel for restoration of 
improved depths of 21, 23, and 24 feet at a cost of $291, 
618. Engineering and design for planned repairs to east 
pier cost $62,732. Pilot Program: Planning for alternate 
disposal areas for disposal of polluted dredged 
materials cost $5,292. 
Condition at end of fiscal year. Existing project is 
completed. A length of 1,265 linear feet of west pier was 
reinforced with steel-sheet piling and concrete. An 
additional 1,080 feet of west pier and lakeward 700 feet 
of east pier crib and superstructure are failing, the cribfilling 
stone has escaped and concrete is badly cracked. 
A 100-foot section of the east pier is in critical condition 
and needs immediate repair. A length of 550 linear feet 
of east pier was reinforced and repaired with steel-sheet 
piling and concrete during 1954 and 1955. Present 
channel was completed in 1935. Stage I of work 
authorized by 1960 act, consisting of deepening lake 
approach, entrance channel, and lower turning basin, 
was initiated in May and completed August 1962. 
Stage II of work authorized by 1960 act, consisting of 
deepening river channel, upper turning basin, and 
construction of two steel sheet pile cell colphins, was 
initiated in October 1962 and completed in December 
1963. Channel is unstable and requires annual 
dredging to maintain adequate depth. Controlling 
depth in river channel and turning basin is 20 feet and 
in entrance channel 22 feet at low-water datum. Costs 
of existing project were $2,191,514 (including $56,806 
emergency relief funds) for new work, and $3,925,123 
(inclding $478 emergency relief funds) for maintenance, 
a total of $6,116,637. 
19. ROCKY RIVER HARBOR, OHIO 
Location. At mouth of Rocky River which empties 
into Lake Erie, 7 miles westerly from Cleveland, Ohio. 
(See Lake Survey Chart 35.) 
Existing project. For description see page 1329 of 
Annual Report for 1966. Federal cost for completed 
project was $343,494 and non-Federal cost was a cash 
contribution of $249,346. See Table 31-B for authorizing 
legislation. 
Local cooperation. Fully complied with local interests 
contributed $249,346 for new work. 
Terminal facilities. There is no commercial navigation 
at Rocky River. Terminal facilities consist of private 
docks for recreational craft. One public dock is owned 
by city of Lakewood. 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and project condition 
surveys by Government plant and hired labor cost $2, 
249. Snagging and clearing in project channels by 
Government plant and hired labor cost $4,016. 
Condition at end of fiscal year. Existing project is 
completed. East pier, rubblemound construction, is 
generally in fair condition, except for a section 200 feet 
long which is badly deteriorated. The project modification 
authorized by 1965 River and Harbor Act was 
selected by the Secretary of the Army for inclusion in 
the Small Authorized Projects program. Realignment 
and extension of channel and construction of an 
anchorage basin, as authorized by 1965 act, were 
initiated in August 1968 and completed in December 
1968. Controlling depth in entrance channel is 9 feet at 
low water datum. 
Costs of existing project were $343,494 for new work 
and $82,969 for maintenance, a total of $426,463. In 
addition, $249,346 contributed funds were expended 
for new work. 
20. SANDUSKY HARBOR, OHIO 
Location. On south shore of Lake Erie, in southeasterly 
portion of Sandusky Bay, 50 miles westerly 
from Cleveland, Ohio. (See Lake Survey Chart 365.) 
Previous projects. For details see page 1960 of Annual 
Report for 1915, and page 1574 of Annual Report for 
1938. 
Existing project. For description see pages 1511-12 of 
Annual Report for 1962. Actual costs for new work for 
completed project were $6,250,121, excluding $325,000 
contributed by local interests. Non-Federal costs for 
completed project are estimated at $675,000 including 
$325,000 cash contribution and remainder of $350,000 
is for dockside dredging adjacent to deepened channels 
authorized by 1960 act. See Table 31-B for authorizing 
legislation. 
Local cooperation. Fully complied with. Local interests 
contributed $325,000 for new work. 
956

BUFFALO, N. Y., DISTRICT 
Terminal facilities. Eighteen piers and wharves, three 
are at west end of harbor and remainder along dock 
channel. One is a base for State-owned fish research 
and patrol boats. One publicly owned and four 
privately owned are used for mooring fishing boats and 
recreational craft and for ferry service. Six terminals 
have railroad connections and eight mechanical-handling 
facilities. Facilities are considered adequate for 
existing commerce. (See Port Series No. 42, revised 
1960, Corps of Engineers.) 
Operations and results during fiscal year. Maintenance: 
Miscellaneous inspection services and condition surveys 
by Government plant and hired labor cost $20, 
743. U. S. hopper dredge Markham removed 525,136 
cubic yards, bin measure, of shoaled material over 420, 
000 square yards of the Bay, Straight, Dock and 
Moseley Channels for restoration of project depths of 
21, 22, 24, 25 and 26 feet at a cost of $239,634. 
Condition at end of fiscal year. Existing project is 
complete. Harbor structures are generally in good 
condition. Entire length of 6,000-foot east jetty 
protection works, completed in 1922, paralleling outer 
harbor entrance channel was repaired under major 
rehabilitation program. Repairs were initiated in May 
1963 and completed in October 1964. Easterly 1,400 
linear feet of rock dike paralleling the dock channel 
were rebuilt in 1956. In 1963, 500 linear feet of 
remaining 2,355 linear feet, westerly portion, of dike 
were removed. Deepening Moseley, Straight, and Bay 
Channel, deepening and enlarging turning basin, all as 
authorized by 1960 act were initiated in June 1962 and 
completed in September 1965. Controlling depths: 
Moseley Channel 26 feet; Straight Channel to intersection 
with Bay Channel 25 feet; remainder of 
Straight Channel to Dock Channel 19 feet; Bay 
Channel to Penn Central Company coal dock 25 feet; 
turning basin 24 feet; and dock channel 18 feet; all at 
low-water datum. Costs of completed existing project 
were $6,250,121 (including $599,500 public work 
funds) for new work, $4,213,176 for maintenance, and 
$675,606 for rehabilitation, a total of $11,138,903. In 
addition, $325,000 expended from contributed funds 
for new work. 
21. VERMILION HARBOR, OHIO 
Location. On south shore of Lake Erie at mouth of 
Vermilion River, 37 miles westerly from Cleveland, 
Ohio. (See Lake Survey Chart 35.) 
Existing project. For description see page 1256 of 
Annual Report for 1964. Estimated Federal cost for 
new work is $1,110,000 (July 1970). Estimated non- 
Federal cost for new work is $752,000 (July 1970) 
including cash contribution of $708,000 and remainder 
for relocation of submarine cable and construction of 
public wharf. See Table 31-B for authorizing legislation. 
Local cooperation. For project modification authorized 
by July 3, 1958 act, local interests must furnish lands, 
451-584 0-72-61 
rights-of-way, and spoil-disposal areas for construction 
and maintenance; hold the United States free from 
damages; provide and maintain mooring facilities; 
establish a competent public body to regulate use of 
harbor facilities; make alterations to utilities; and 
contribute in cash 42 percent of initial cost of project 
improvement. Assurances will be formally requested 
upon completion of preconstruction planning and no 
difficulties are anticipated. 
Terminal facilities. Fish is only item of commerce 
regularly handled at Vermilion. There are no dock 
facilities being used for handling other commodities. 
Considerable recreational small-boat activity exists 
and many private docks are available for basing, 
storing, repairing and servicing these craft. 
Operations and results during fiscal year. New work: 
Preconstruction planning for work authorized by 1958 
act was continued by hired labor. Maintenance: 
Miscellaneous inspection and condition surveys by 
Government plant and hired labor cost $7,315. U. S. 
derrick boats B. D. 6634 and Tonawanda repaired 400 
linear feet of west pier at a cost of $116,850. Snagging 
and clearing in project channels by Government plant 
and hired labor cost $5,788. 
Condition at end of fiscal year. Existing project is 25 
percent complete. Repairs to piers under minor 
rehabilitation program were initiated in June and 
completed in October 1964. Work remaining to 
complete project consists of completion of preconstruction 
planning and construction of new channel 
and extension of river channel as authorized by 1958 
act. Controlling depth in entrance channel to inner end 
of west pier is 11 feet, at low-water datum. Costs of 
existing project were $274,288 for new work, $194,074 
for maintenance, and $139,775 for rehabilitation, a 
total of $608,137. 
22. RECONNAISSANCE AND CONDITION 
SURVEYS 
Surveys were conducted at Niagara River, N. Y. and 
Olcott Harbor, N. Y. during June 1970 and at Sackets 
Harbor, N. Y. during March 1970. 
23. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 31-C. 
24. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Section 107 Public Law 86- 
645 (Preauthorization) 
Fiscal year costs for continuing preauthorization 
studies for Lorain Harbor were $3,470 for a cumulative 
total to date of $11,566. Fiscal year costs for initiation 
of preauthorization studies for Little River, Cayuga 
Island, N. Y. were $11,552. 
)57

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
BEACH EROSION CONTROL 
25. HAMLIN BEACH STATE PARK, NEW 
YORK 
Location. In town of Hamlin, Monroe County on 
south shore of Lake Ontario about 20 miles west of 
Rochester, N. Y. (See Lake Survey Chart 24.) 
Existing project. Provides for: (a) construction of four 
new groins; (b) alterations of three existing groins; (c) 
grading of bluffs to a stable slope; and (d) placement of 
217,000 cubic yards of sand to provide a minimum 
beach width of 100 feet at mean lake level. Estimated 
costs (July 1970) are $1,700,000 Federal and $730,000 
non-Federal. Existing project was authorized by 1958 
River and Harbor Act (H.D. 13$34/1). 
Local cooperation. Local interests are required to adopt 
plan of restoration and protection recommended for 
westerly beach; obtain approval of Chief of Engineers 
prior to commencement of work of detailed plans and 
specifications for project and also arrangements for 
prosecuting work; assure maintenance of restoration 
and protective measures during their useful life, 
including replenishment of beach fill at suitable 
intervals, as may be required to serve intended 
purpose; provide at their own expense all necessary 
lands, easements and rights-of-way; hold and save 
United States free from all claims for damages that 
may arise before, during, or after prosecution of work; 
assure that water pollution that would endanger health 
of bathers will not be permitted; and, assure continued 
public ownership of shore and its administration for 
public use only. Assurances of local cooperation are 
contained in supplemental agreement dated July 22, 
1963 between the State of New York Conservation 
Dept., Division of Parks and the Buffalo District Corps 
of Engineers for United States. 
Operations and results during fiscal year. Preparation of 
design memorandum was completed. 
Condition at end offiscalyear. Design memorandum was 
completed. State of New York will prepare plans and 
specifications and construct project based on design 
memorandum. 
26. PRESQUE ISLE PENINSULA, ERIE, PA. 
Location. At Erie, Pa., on south shore of Lake Erie, 78 
miles southwest of Buffalo, New York and 102 miles 
east-northeast of Cleveland, Ohio. (See Lake Survey 
Charts 3, 33, and 332.) 
Existing project. For description see page 1393 of 
Annual Report for 1963. Estimated costs (July 1970) 
are $2,322,000 Federal and $2,573,000 non-Federal. 
See Table 31-B for authorizing legislation. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New work: 
Reimbursement of $245,654 was made to the Commonwealth 
of Pennsylvania for the Federal share of 
cost of previously completed sand replenishment. 
Hired labor costs for periodic surveys and supervision 
and inspection in connection with work completed by 
Commonwealth of Pennsylvania were $49,653. Maintenance: 
Project condition survey was made at a cost of 
$135. 
Condition at end of fiscal year. Since project authorization, 
Federal participation in first costs for 
remaining work was changed from one-third share to 
70 percent in accordance with provisions of section 103, 
Public Law 87-874. Construction of project works for 
shore protection as authorized by 1954 River and 
Harbor Act was accomplished in two stages by separate 
contracts. Stage I, completed in September 1956, 
provided for realinement and removal of steel-sheet 
pile bulkhead and placing of sandfill. Stage II, 
completed in October 1956, provided for construction 
of bulkheads and groins. Modification to six groins was 
accomplished in 1966. Under the periodic nourishment 
program authorized by 1960 River and Harbor Act the 
first major beach nourishment was completed in 1961. 
The second beach nourishment was completed in 1965. 
Special coarse sand fill was placed in 1966. Third 
nourishment was completed in 1969. Periodic nourishment 
of the beach for a 10-year period from year of 
first major nourishment operation remains to complete 
project. Authority for Federal participation will expire 
in May 1971. 
27. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECTS 
See table 31-D.
FLOOD CONTROL 
28. EASTLAKE, OHIO, CHAGRIN RIVER 
Location. City of Eastlake is in Lake County, Ohio. 
Chagrin River flows northerly through city into Lake 
Erie. (See Army Map Service quandrangles for 
Chesterfield, Eastlake and Mayfield Heights and Lake 
Survey chart 34.) 
Existing project. Provides for: (a) Realinement and 
enlargement of Chagrin River channel from deep 
water in Lake Erie through a part of city of Eastlake, a 
total distance of 10,400 feet with depths of 10 feet from 
deep water in lake to a point 1,750 feet above river 
mouth and 7 feet deep in the remainder of channel; (b) 
construction of arrowhead breakwaters in Lake Erie at 
mouth of Chagrin River, the east breakwater 930 feet 
long and west breakwater 1,430 feet long; (c) construction 
of levees for a total length of 7,000 feet; (d) a 
1,500-foot long spur channel 100 feet wide, 6 feet deep; 
(e) an access channel for navigation 400 feet long, 50 
feet wide and 4 feet deep; (f) development of 
recreational facilities at the river mouth. Estimated 
costs (July 1970) are $3,340,000 Federal and $1,300, 
000 non-Federal including $856,000 cash contribution 
and remainder for lands, relocations, parking lot, dock, 
958

BUFFALO, N. Y., DISTRICT 
and ramp. Existing project was authorized by 1965 
Flood Control Act (S.D. 35/89/1). 
Local cooperation. Assurances were furnished by the 
City of Eastlake, Ohio and were accepted by the 
District Engineer on February 27, 1967. Compliance 
with the assurances will be required when project 
construction is initiated. Local interests are required to 
contribute in cash 50 percent of that portion of the first 
cost of Federal construction allocated to recreational 
navigation, such contribution presently estimated at 
$856,000 (July 1970) to be paid either in a lump sum 
prior to initiation of construction, or in installments 
prior to start of pertinent work items in accordance 
with construction schedules as required by the Chief of 
Engineers, the final apportionment of cost to be made 
after actual costs have been determined. 
Operations and results during fiscal year. Preconstruction 
planning by hired labor was continued. 
Condition at end offiscalyear. Construction has not been 
initiated. Work remaining to complete project consists 
of completion of preconstruction planning and construction 
of local flood protection improvements. 
29. FREMONT, OHIO, SANDUSKY RIVER 
Location. On Sandusky River in city of Fremont, 
Sandusky Coun. y, Ohio. Sandusky River flows northerly 
through city of Fremont and enters Sandusky Bay, 
an arm of Lake Erie, about 14 miles north of city. (See 
Geological Survey Map of Fremont-East.) 
Existing project. Provides for: (a) Channel enlargement 
and partial realignment in a 10,450-foot 
reach of Sandusky River in city of Fremont (including 
a 2,000-foot long friction channel); (b) construction of 
18,300 feet of levees and 3,500 feet of flood walls; (c) 
construction of three pumping stations along west bank 
at Minnow Creek, Birchard St. and Liberty St. and one 
pump station on east bank at Pine St.; and, (d) 
construction of miscellaneous drainage structures and 
other appurtenant works. Estimated costs (July 1970) 
are $8,400,000 Federal and $780,000 non-Federal for 
lands, relocations and alterations of streets, pipelines 
and utilities. Existing project was authorized by 1962 
Flood Control Act (S. Doc. 136, 87th Cong. 2nd sess). 
Local cooperation. Assurances were furnished in September 
1965 and were accepted on 30 September 1965. 
City of Fremont has appropriated funds for land 
acquisition and the procuring of lands, easements and 
rights-of-way is underway. 
Operations and results during fiscal year. Preconstruction 
planning by hired labor was completed. Invitation for 
bids was issued in May 1970 and bids were opened on 
June11, 1970. 
Condition at end offiscalyear. Construction has not been 
initiated. 
30. ITHACA, N.Y., CAYUGA INLET 
Location. City of Ithaca is in Tompkins County, N.Y., 
Cayuga Inlet flows northerly through western portion 
of city and enters head of Cayuga Lake at Ithaca, N.Y. 
(See Geological Survey maps of Ithaca-West, and 
Ithaca-East.) 
Existing project. Provides for: (a) Enlargement of 
channel in Cayuga Inlet from Cayuga Lake to a point 
5,000 feet from the lake varying from 310 to 320 feet 
wide at bottom; (b) new bypass channel on a new 
alignment from upstream end of enlarged channel, 
previously described, to a junction with existing 
channel of Cayuga Inlet near foot of Taber Street, 200 
feet wide at bottom from junction with above described 
channel for about 2,000 feet thence continuing for 2, 
750 feet to foot of Taber Street and narrowing to 92 feet 
at this point; (c) use at its present capacity the existing 
channel from a point 7,000 feet from Cayuga Lake to a 
point near foot of Taber Street; (d) realignment and 
enlargement of channel generally on route of present 
Cayuga Inlet channel from junction previously described 
extending upstream for 4,300 feet, 105 feet wide 
at bottom, thence narrowed to 80 feet in vicinity of a 
drop structure upstream from this point; (e) deepening 
of these channels to provide uniform bottom grades; (f) 
construction of a drop structure and fishway upstream 
from mouth of Coy Glen; (g) construction of a levee 
along right bank from drop structure to a point near 
intersection of Elmira and Spencer Roads; (h) construction 
of a levee along left bank from upstream of 
drop structure to a point on south side of Coy Glen; (i) 
construction of a closure structure at point where levee 
crosses Lehigh Valley Railroad; (j) protection of levees 
and closure structure against erosion; (k) construction 
of highway bridges across new channel, at State Street 
and Taughannock Blvd (Route 89), by local interests; 
(1) construction of a new one-track railroad bridge 
upstream from mouth of Coy Glen. Estimated costs 
(July 1969) are $3,500,000 Federal and $2,513,000 
non-Federal ($77,000 cash contribution and remainder 
for lands, relocation of two highway bridges, access 
roads, utilities, and fishway holding pens). Existing 
project was authorized by 1960 Flood Control Act (H. 
Doc. 204, 86th Cong., 1st sess.). 
Local cooperation. Assurances were furnished and 
accepted by District Engineer April 28, 1964. Cash 
contributions, consisting of $23,000 toward incremental 
cost of construction of holding pens and fish 
trapping facilities and $77,000 towards first cost for 
construction of project have been received. All other 
conditions of local cooperation are being complied 
with, concurrent with requirements for construction of 
project works. 
Operations and results during fiscal year. Construction of 
project is being done in three stages. Stages I and II 
have been previously completed. Contract operations 
for Stage III comprising of construction of remainder of 
channel on new alignment between drop structure at 
959

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
upper end of project and channel at lower end of 
project, construction of levees and rowing course in new 
channel were completed in June 1970 at a cost for the 
year of $315,600. Appurtenant track changes for 
replacement of railroad bridge are being accomplished 
by contract with the Lehigh Valley Railroad. Track 
changes were completed by railroad, except for 
deferred maintenance for first year of operation over 
new tracks, at a cost of $5,923. Engineering and design 
costs for the year were $1,637. 
Condition at end of fiscal year. Project is complete. 
Improvement of channel at Cayuga Inlet from the 
outlet upstream to Cascadilla Creek, Stage I, was 
initiated in January 1965 and completed in November 
1965. Contract operations for Stage II at upper end of 
project, replacement of Lehigh Valley Railroad bridge 
and construction of drop structure, were initiated in 
August 1966. Contract operations for Stage III were 
initiated in August 1967 and completed in June 1970. 
31. LACKAWANNA, N.Y. SMOKES CREEK 
Location. City of Lackawanna is in Erie County, N.Y. 
Smokes Creek flows west through city and enters Lake 
Erie about 6 miles south of lake outlet into Niagara 
River. (See Geological Survey maps of Buffalo-Southeast, 
Hamburg, and Orchard Park.) 
Existing project. Provides for: (a) Channel in main 
stream of Smokes Creek about 9,400 feet from Lake 
Erie to confluence of North and South branches; (b) 
channel in North Branch extending 7,500 feet upstream 
from its confluence with main stream; (c) 
channel in South Branch extending 5,650 feet upstream 
from its confluence with main stream, partly on 
a new alignment for 2,000 feet at upstream portion; (d) 
deepening three channels to provide adequate waterway 
opening through bridges; (e) raising two bridges 
across main stream owned by South Buffalo Railway 
Co., one about 2,000 feet and the other 2,500 feet, 
upstream from Hamburg Turnpike; (f) raising two 
Erie-Lackawanna Railroad bridges across North and 
South Branches, about 500 feet downstream from 
Wood Street; and, (g) protection of abutments of 
bridges across 3 channels as necessary to insure their 
safety. Estimated costs (July 1969) are $3,430,000 
Federal and $1,600,000 non-Federal (includes $48,000 
cash contribution and remainder for lands, relocation 
of two highway bridges, relocation of utilities, channel 
improvements, and jetties). Existing project was 
authorized by 1960 Flood Control Act (H. Doc. 200, 
86th Cong., 1st sess.). 
Local cooperation. Fully complied with. Local interests 
contributed $50,000 in anticipation of subsequent 
adjustments in contributed amount to be made upon 
project completion. 
Operations and results during fiscal year. Construction of 
project is being done in three sections. Section I and II 
have been previously completed. Section III comprises 
alterations to four railroad bridges, protection of bridge 
abutments, and channel improvements on main stem 
of Smokes Creek above Hamburg Turnpike on South 
Branch and on remainder of North Branch. Contract 
operations for this section were continued and are 99 
percent completed at a cost of $132,574. 
Condition at end of fiscal year. Section I of project, which 
includes protection of bridge abutments and channel 
improvements on North Branch of Smokes Creek 
above bridge No. 22, was initiated in October 1964 and 
completed in October 1965. Section II of project which 
includes protection of bridge abutments and channel 
improvements on main stem of Smokes Creek from 
downstream project limits to and including Hamburg 
Turnpike, was initiated in April 1965 and completed in 
January 1967. Contract operations for section III, 
which were initiated in September 1965, remain to be 
done to complete the local flood protection project. 
32. LITTLE RIVER AND CAYUGA CREEK 
AT AND IN THE VICINITY OF 
CAYUGA ISLAND, NEW YORK 
Location. On Cayuga Island, in city of Niagara Falls, 
Niagara County, New York, approximately six miles 
upstream from Niagara Falls, between Little River and 
Niagara River (See Geological Survey map of Tonawanda 
West). 
Existing project. Provides for: (a) levees totaling about 
2,840 feet in length on north and east sides of island; (b) 
land fill in low areas on the south side of island; (c) six 
new manholes with flap gates on inlets on storm sewer 
outlets along levees; and (d) a shallow ditch and two 
catch basins behind this levee on north side of island. 
Estimated Federal cost for new work is $119,000 (July 
1970). Estimated non-Federal costs are $44,000 (Oct. 
1965) all for modifications to existing sewer facilities. 
Project was authorized by Chief of Engineers on 
August 24, 1966 under authority of section 205, 1948 
Flood Control Act, as amended. 
Local cooperation. Assurances of local cooperation have 
been furnished and accepted by the District Engineer 
on December 27, 1967. By letter dated April 15, 1969 
the State of New York advised that the required rightof-
way are now being mapped, appraisal of properties 
is scheduled to begin in April 1970, right of entry for 
construction would probably be available in early Fall 
1970. 
Operations and results during fiscal year. Contacts with 
local interests regarding land acquisition were continued. 
Condition at end of fiscal year. Detailed project report 
was approved on August 24, 1966. Issuing of bids for 
construction of project is dependent upon completion 
of acquisition of lands, easements and rights-of-way by 
local interests. Construction of the project remains to 
be done to complete the project. 
960

BUFFALO, N. Y., DISTRICT 
33. MT. MORRIS RESERVOIR, GENESEE 
RIVER, N.Y. 
Location. Dam is on Genesee River 66.9 miles above 
river mouth and about 32 miles southwesterly of 
Rochester, N.Y. Reservoir is in Livingston and 
Wyoming Counties, N.Y. (See Geological Survey maps 
of Nunda and Portage, N.Y.) 
Existing project. For description of existing project as 
authorized by 1944 Flood Control Act see page 1575 of 
Annual Report for 1962. New work for completed 
project cost $23,365,559. In addition $5,000 contributed 
funds expended for new work. 
Local cooperation. None required. Local interests 
contributed $5,000 for new work. 
Operations and results during fiscal year. Operations and 
maintenance: Operation and ordinary maintenance of 
dam, reservoir, and service facilities, condition and 
operation studies and miscellaneous reports were 
accomplished by hired labor for $71,437. Cooperative 
stream gaging program accomplished by Geological 
Survey for $19,027 and Weather Bureau reporting and 
hydroclimatic networks cost $2,778. 
Condition at end of fiscal year. Existing project is 
complete. Construction of concrete gravity-type dam 
was initiated by contract March 1948 and completed 
May 1952. Clearing of reservoir area and construction 
of all appurtenances are complete. Operations and 
maintenance of dam, reservoir, and appurtenances are 
continued annually. 
34. RED CREEK, N. Y. 
Location. Red Creek is a minor tributary of the 
Genesee River located near northern end of river basin 
in Monroe County, N. Y. Project is located in city of 
Rochester and suburban towns of Brighton and 
Henrietta immediately south of Rochester. 
Existing project. Provides for: (a) enlargement and 
realinement of channels for 4,400 feet along east 
branch, 13,600 feet along west branch and 11,900 feet 
along main channel, 5,200 feet of which would be a 
new diversion channel to Genesee River; (b) construction 
of two new highway bridges and a service 
bridge, replacement of a railroad bridge and two 
highway bridges, modification of three railroad bridges 
and a highway bridge, and replacement of three 
highway culverts; (c) construction of 4,650 linear feet 
of levee along right bank of main channel with a gated 
culvert to by-passed downstream reach of existing 
channel; (d) construction of 1,480 linear feet of levee 
across west branch with a gated culvert through the 
levee; and, (e) construction of 14,500 linear feet of levee 
along right bank of Genesee River with ditch improvements 
for diversion of internal drainage presently 
discharged to the river. Estimated costs (July 1970) are 
$2,230,000 Federal and $1,840,000 non-Federal for 
lands, damages, relocations, construction of culverts 
and modification of golf course. Existing project was 
authorized by 1966 Flood Control Act (S.D. 35y89/2). 
Local cooperation. Local interests are required to 
provide without cost to United States, all lands, 
easements, and rights-of-way necessary for construction; 
hold and save United States free from 
damage due to construction works; maintain and 
operate all works after completion in accordance with 
regulations prescribed by Secretary of the Army; 
provide without cost to United States all relocations of 
buildings, utilities, roads, sewers, and related and 
special facilities necessary for construction of project, 
including any embankment for East River Road in 
excess of that required for a levee, construction of 
highway bridges and a service bridge across relocated 
main stem channel at East River Road and Crittenden 
Road, replacement of existing highway bridges on 
main stem at Town Line Road and at Jefferson Road, 
and replacement of existing culverts on West Branch at 
Crittenden Road, Bronx Drive and New York Route 
252; prescribe and enforce regulations to prevent 
encroachment on channels and rights-of-way necessary 
for proper functioning of project; take appropriate 
regulatory measures to preserve the ponding and 
floodway capacity necessary to proper functioning of 
the project upstream of proposed levee culvert; and, 
take necessary action to adopt building regulations or 
otherwise restrict development on unimproved property 
in Red Creek project area to provide that first 
elevations of future construction be at or above 100- 
year stage line. Local interests favor improvement and 
have advised they are prepared to participate in the 
project and provide the required assurances when 
required. 
Operations and results during fiscal year. Preconstruction 
planning by hired labor was continued. 
Condition at end of fiscal year. Construction has not been 
initiated. Work remaining to complete project consists 
of completion of preconstruction planning and construction 
of local flood protection improvements. 
35. WELLSVILLE, N.Y., GENESEE RIVER 
Location. Village of Wellsville is in Allegany County 
at junction of Dyke Creek and Genesee River. (See 
Geological Survey map of Wellsville, N.Y.) 
Existing project. Provides for: (a) Channel in Genesee 
River with bottom widths of 100 to 135 feet from a 
point 2,700 feet downstream from Bolivar Road Bridge 
to Dyke Creek, thence with a bottom width of 110 to 
135 feet to about 4,300 feet upstream of Dyke Creek; a 
total distance of about 13,000 feet; (b) channel in Dyke 
Creek with bottom widths of 50 to 70 feet from mouth 
of creek to a point about 4,025 feet upstream; (c) 
widening existing channels to obtain such widths; 
channel deepening and levee and embankment construction 
so as to confine floodflows within these 
channels; and protection of channel banks and levees 
against erosion; (d) concrete drop structures; on 
Genesee River about 3,300 feet below Dyke Creek; and 
on Dyke Creek about 3,300 feet above its mouth; (e) 
steel sheet pile weir on Genesee River about 3,350 feet 
above Dyke Creek; and (f) pier protection for South 
961

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Main Street highway bridge and Erie Railroad bridge 
over Dyke Creek and the Wellsville, Addison and 
Galeton Railroad bridge over Genesee River. Estimated 
Federal cost of project is $2,010,000 (July 
1970). Estimated non-Federal cost is $330,000 (July 
1970). For completed portion of project non-Federal 
costs were $170,000, which included a cash contribution 
of $50,000 and $120,000 for lands, rights-ofway, 
and relocation of utilities. Remainder of non- 
Federal costs are for similar items for additional 
proposed plan of remedial measures to completed 
project works. Existing project was authorized by Flood 
Control Act approved May 17, 1950 (H. Doc 232, 81st 
Cong., 1st sess.). Modifications to rectify deficiencies in 
completed project were authorized in November 1966 
in accordance with Design Memorandum for Rectification 
of Deficiencies in Completed Flood Protection 
Project, Wellsville, New York. Modifications 
are included in description of existing project. 
Local cooperation. For additional improvements to 
project, local interests must furnish assurances that 
they will submit, for prior approval of the United 
States, all plans for highway improvements in the 
vicinity of Wellsville flood control project which 
involve or require modifications of existing facilities of 
that project, and thereafter make such improvements 
in accordance with plans so approved; provide lands, 
easements, and rights-of-way, including ponding areas, 
and make all alterations to utilities, necessary for 
construction of the additional flood control improvements; 
hold the United States free from damages 
due to construction of the additional flood control 
improvements; prescribe and enforce regulations to 
prevent encroachments on project channels as modified 
by the additional improvements; and maintain 
and operate all of the project works after completion of 
additional improvements in accordance with regulations 
prescribed by the Secretary of the Army. 
Assurances have been received and were accepted on 
February 28, 1969. For completed portion of project 
local interests contributed $50,000. 
Operations and results during fiscal year. Preparation of 
plans and specifications for rectification of deficiencies 
was continued. Planning has been delayed pending 
finalization of acquisition of lands and rights-of-way by 
local inter ests. The State of New York has advised that 
land acquisition work will be completed late in 1970. 
Condition at end of fiscal year. Existing project was 
completed in November 1957 and repairs to flooddamaged 
riprap slopes made in September 1959. An 
inspection of completed project disclosed that additional 
work is necessary to improve completed 
project. There has been widespread erosion of unprotected 
portions of channel banks, particularly on 
outside banks at bends and subsequent deposition of 
eroded material usually along inside banks. Design 
memorandum to develop a plan for rectification of 
deficiencies was completed in November 1966. Preparation 
of plans and specifications was initiated in 
December 1966. Completion of plans and specifications 
and construction of additional improvements 
remains to be done to complete project. 
36. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspection of completed flood control works for 
compliance with Federal requirements were made 
during the year at a cost of $1,670. Total cost to June 
30, 1970 was $16,680. 
37. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 31-E. 
38. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood Control and Coastal Emergencies (Public Law 99, 
84th Cong., as amended by Sec 206 of Flood Control Act of 
1962) 
Federal costs for fiscal year were $8,646 for advance 
preparation and $43,643 for emergency operation. 
Flood control activities pursuant to Section 205, Public Law 
858, 80th Congress, as amended (preauthorization) 
Bull Creek, N. Y.-Costs of $18,664 were incurred 
for preparation of Detailed Project Report. 
Cayuga Creek, N. Y.-Costs of $2,227 were incurred 
for preparation of unfavorable Reconnaissance Report. 
Conneaut Creek in vicinity of Conneautville, 
Pa.-Costs of $4,218 were incurred for preparation of 
Reconnaissance Report. 
Hawthorne Creek, Ohio-Costs of $4,143 were 
incurred for preparation of Reconnaissance Report. 
GENERAL INVESTIGATIONS 
39. SURVEYS 
Fiscal year costs were $944,557 of which $663,658 
was for navigation studies, $12,556 was for flood 
control studies, $5,539 for beach erosion cooperative 
studies, $84,164 for special studies, $136,422 for 
coordination with other agencies and $42,218 for 
comprehensive basin studies. 
40. COLLECTION OF STUDY OF BASIC 
DATA 
Fiscal year cost was $7,848 for work in connection 
with International Niagara Committee of International 
Niagara Board of Control and $213,416 for 
flood plain management services including completion 
of flood hazard reports for Black River, O., Huron, O. 
and Vermilion River, O. 
Flood plain information reports were initiated for 
Butternut Creek, N. Y., Chittenango Creek, N. Y., 
Cuyahoga River, Ohio- Reach 4, Ley Creek, N. Y., 
Limestone Creek, N. Y., Rocky River, Ohio--Reach 3 
and were continued for Cuyahoga River, Ohio- 
Reach 2, and Reach 3, and Rocky River, 
Ohio-Reach 2. 
962

BUFFALO, N., DISTRICT 
TABLE 31-A 
See 
Section 
COST AND FINANCIAL STATEMENT 
Total to 
in Text Project FY67 FY68 FY69 FY70 June 30, 1970 
1. Aquatic Plant 
Control 
2. Ashtabula Harbor, 
Ohio 
3. Black Rock Channel 
and Tonawanda 
Harbor, N. Y. 
4. Buffalo Harbor, 
N.Y. 
5. Cleveland Harbor, 
Ohio 
(Contributed Funds) 
6. Conneaut Harbor, 
Ohio 
7. Dunkirk Harbor, 
N. Y. 
8. Erie Harbor, Pa. 
Funding 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
$ 2,000 
535 
-10,397 
153,605 
212,356 
239,828 
- 
$ 423 
601 
200,222 
196,792 
400,344 456,862 
413,995 449,144 
189,000 
28,788 
64,529 
64,529 
520,300 
500,573 
-13,049 
1,055,200 
368,705 
647,000 
116,627 
1,862,534 
1,258,928 
1,350,079 
1,860,788 
6,467 
6,467 
5,681 
5,681 
177,953 
435,543 
181,258 
181,258 
1,670,000 
1,666,210 
224,776 
197,304 
c51,500 
364,937 
1,155,389 
1,285,856 
-500,000 
17,440 
2,338,467 
2,572,667 
620,843 
622,170 
74,717 
74,717 
1,988 
1,988 
1,603 
51,273 
50,657 
$ 2,423 
1,136 
11,680,3391 
11,680,339 
3,349,823 
3,346,393 
10,515,1202 
10,515,1202 
12,065,0973,4 
12,056,6343,4 
23,115,1875 
23,115,187s 
15,754,8066 
15,492,5056 
295,457 
295,457 
31,589,3997 
31,429,777 
33,192,4518 
33,163,5328 
201,9609 
149,847 
464,903 
464,903 
8,346,64110 
8,346,64110 
2,653,24411 
2,653,244 
651,850 
651,850 
1,229,42412 
1,229,424 
1,135,92313 
1,135,92313 
3,597,87314 
3,597,87314 
4,927,20015 
4,926,2441s 
1,154 
1,154 
963 
1,047,906 
-70,025 
-5,404 
42,071 
3,879,238 
3,202,243 
33,930 
85,237 
85,237 
19,052 
19,052 
77,631 
78,247 
740,462 
1,125,749 
-151,000 
29,345 
1,662,638 
2,697,669 
118,030 
99,847 
76,767 
76,767 
25,716 
25,716 
128,290 
127,334

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 31-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project Funding FY67 FY68 FY69 FY70 Jur 
9. Fairport Harbor, New Work 
Ohio Approp. - - - - 
10. Great Sodus Bay 
Harbor, N. Y. 
11. Huron Harbor, 
Ohio 
12. Irondequoit Bay, 
N. Y. 
13. Little Sodus Bay 
Harbor, N. Y. 
14. Lorain Harbor, 
Ohio 
15. Oak Orchard 
Harbor, N. Y. 
16. Ogdensburg 
Harbor, N. Y. 
17. Oswego Harbor, 
N. Y. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
210,682 
210,682 
115,155 
47,125 
134,449 
145,605 
52,000 
3,112 
51,764 
51,764 
357,362 
280,000 
196,672 
155,268 
155,268 
25,000 
7,835 
3,904 
2,404 
86,955 
86,955 
280,692 
280,543 
-62,497 
5,533 
94,242 
93,855 
12,436 
88,923 
82,855 
-17,741 
78,031 
100,000 
24,932 
256,379 
227,255 
75,000 
53,495 
5,548 
6,998 
9,910 
9,910 
219,644 
219,793 
32,204 
32,204 
65,534 
65,921 
10,000 
7,967 
24,512 
30,580 
10,397 
333,220 
240,161 
269,285 
17,002 
2,081 
2,131 
150,770 
150,770 
170,042 
170,042 
5,000 
1,200 
80,150 
80,150 
36,743 
22,000 
4,552 
270,831 
283,245 
281,728 
21,066 
2,731 
2,731 
5,901 
5,901 
Total to 
ne 30, 1970 
2,959,61116 
2,959,61116 
4,568,017 
4,568,017 
$ 610,95917 
610,959' 
1,465,643 
1,461,843 
713,544 
713,544 
1,304,13918 
1,304,1398 
2,180,131 
2,180,131 
247,030 
247,030 
130,000 
81,155 
301,39419 
301,394 
968,809 
951,361 
742,822 
742,822 
13,582,47720 
13,572,58620 
4,190,670 
4,189,153 
107,500 
106,898 
646,466 
646,466 
733,09322 
733,09322 
8,430,01623 
8,430,016 
2,658,95324 
2,658,95324 
307,590 
307,590 
964

TABLE 31-A (Cont'd) 
BUFFALO, N., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project Funding FY67 FY68 FY69 FY70 
18. Rochester New Work 
Harbor, N. Y. Approp. - - - - 
19. Rocky River, 
Ohio 
20. Sandusky 
Harbor, Ohio 
21. Vermilion 
Harbor, Ohio 
25. Hamlin Beach 
State Park, 
N. Y. 
26. Presque Isle 
Peninsula, Pa. 
28. Eastlake-Chagrin 
River, Ohio 
29. Fremont, 
Sandusky River, 
Ohio 
30. Ithaca, N. Y., 
Cayuga Inlet 
(Federal Funds) 
(Contributed 
Funds) 
31. Lackawanna, N. Y. 
Smokes Creek 
(Contributed 
Funds) 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
159,468 
159,468 
262,000 
21,902 
390 
390 
$ -2,380 
208 
280,586 
255,568 
35,000 
13,349 
538 
538 
430,000 
421,716 
75,000 
7,310 
100,000 
157,465 
450,000 
379,161 
95,000 
1,260,000 
749,560 
92,466 
91,966 
14,100 
- 
359,055 
383,729 
75,000 
38,445 
30,000 
10,619 
10,000 
16,878 
125,000 
49,318 
50,000 
127,529 
950,000 
980,687 
50,000 
342,734 
174,704 
171,780 
-28,477 
219,472 
1,665 
1,665 
343,256 
343,599 
7,000 
48,563 
19,381 
-1,259 
147 
74,276 
300,000 
137,251 
1,020,000 
956,021 
18,000 
126,259 
429,688 
Total to 
June 30, 1970 
371,417 
374,459 
2,439,30825 
2,439,30825 
4,543,03426 
4,542,652 
343,49427 
343,494 
82,969 
82,969 
$ 6,727,27028 
6,727,27028 
4,213,176 
4,213,176 
675,606 
675,606 
288,278 
274,288 
194,074 
194,074 
139,775 
139,775 
37,000 
37,000 
1,742,33229 
1,737,61929 
135 
135 
200,000 
167,450 
840,000 
776,742 
3,494,330 
3,334,863 
95,00030 
95,000 
3,476,259 
3,437,635 
50,000 
48,000 
6,265 
6,265 
260,377 
260,377 
38,000 
40,453 
129,953 
129,953 
7,000 
7,000 
300,000 
295,287 
135 
135 
36,546 
99,522 
-60,000 
323,160 
77,000 
60,000 
132,574 
30,600 17,400 
965

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 31-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 20, 1970 
32. Little River & New Work 
Cayuga Creek, Approp. 14,217 - 86,000 - 110,217 
Cayuga Island, Cost 3,145 7,421 1,542 876 21,097 
N. Y. 
33. Mt. Morris New Work 
Reservoir, Approp. - - - - 23,365,55931 
Genesee River, Cost - - - - 23,365,55931 
N. Y. Maint. 
Approp. 74,300 69,300 99,000 89,483 1,124,071 
Cost 72,811 63,774 101,024 93,242 1,118,838 
34._ Red Creek, N. Y. New Work 
Approp. $ - $ 50,000 $ 97,000 $ 28,000 $ 175,000 
Cost - 21,254 103,722 27,586 152,562 
35. Wellsville, N.Y., New Work 
Genesee River Approp. 200,000 72,000 - - 1,340,30332 
Cost 12,104 4,692 5,077 22,888 1,112,759 
1. Includes $565,192 for previous projects. 
2. Includes $58,027 for previous projects. 
3. Includes $4,922 emergency relief authority administrative 
costs transferred from new work to maintenance upon conversion 
to programming and budgeting system July 1, 1953, by 
direction of Office, Chief of Engineers. 
4. Includes appropriations and costs under appropriation 
titles 96x3123 Operation and Maintenance and 96x5125 
Maintenance and Operation of Dams and Other Improvements of 
Navigable Waters. 
5. Includes $4,277,586 for previous projects. 
6. Includes $1,883,647 for previous projects. Excludes 
$390,000 contributed funds. 
7. Includes $1,564,154 for previous project and appropriations 
and costs for modification authorized for construction 
under authority of Sec. 107, 1960 R & H Act. 
8. Includes appropriations and costs under appropriation 
titles 96x3123 Operation and Maintenance and 96x5125 Maintenance 
and Operation of Dams and Other Improvements of 
Navigable Waters. 
9. Includes $50,000 contributed funds expended in FY 
1935 and FY 1936. 
10. Includes $805,272 for previous projects. 
11. Includes $39,784 for previous projects. 
12. Includes $811,250 for previous projects. Excludes 
$11,000 contributed funds expended. 
13. Includes $176,520 for previous projects. 
14. Includes $736,967 for previous projects. 
15. Includes $104,900 for previous projects. Excludes 
$154,500 contributed funds. 
16. Includes $368,940 for previous projects 
17. Includes $361,772 for previous projects. 
18. Includes $269,789 for previous project. 
19. Includes $232,328 for previous projects. 
20. Includes $292,203 for new work for previous projects. 
Excludes $3,000 contributed funds. Also excludes appropriation 
of $25,000 and costs of $8,096 previously reported for 
modification under authority of Section 107, 1966 R & H Act. 
Costs are shown in Section 14. 
21. Includes $271,380 for previous projects. 
22. Includes $130,512 for previous projects. 
23. Includes $1,187,977 for previous projects. 
24. Includes $945,684 for previous projects. 
25. Includes $247,794 for previous projects. 
26. Includes $617,529 for previous projects and $478 emergency 
relief authority administration costs transferred from new 
work to maintenance upon conversion to programming and 
budgeting system, July 1, 1953, by direction of Office, Chief of 
Engineers. 
27. Excludes $249,346 contributed funds. 
28. Excludes $325,000 contributed funds expended. Includes 
$477,149 for previous projects. 
29. Excludes $1,327,139 contributed funds. 
30. Includes $77,000 required cash contribution toward first 
cost of construction and $18,000 toward incremental cost of 
construction of holding pens and fish trapping facilities. 
31. Excludes $5,000 contributed funds. 
32. Excludes $50,000 contributed funds. 
966

BUFFALO, N., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 3, 1896 
Mar. 3, 1905 
June 25, 1910 
Mar. 2, 1919 
Aug. 30, 1935 
Aug. 26, 1937 
Mar. 2, 1945 
Sept. 3, 1954 
July 14, 1960 
Oct. 27, 1965 
Aug. 11, 1888 
June 3, 1896 
June 13, 1902 
June 13, 1902 
Aug. 8, 1917 
Mar. 3, 1905 
July 27, 1916 
Mar. 2, 1919 
Mar. 2, 1945 
Sept. 22, 1922 
Mar. 3, 1925 
June 26, 19345 
ASHTABULA HARBOR, OHIO (See Section 2 of Text) 
Construction of breakwater. 
Enlarge outer harbor by extending west breakwater and 
constructing new east breakwater; pierheads on lakeward 
ends of breakwaters; and remove part of old east 
breakwater. 
Extend west breakwater to shore; dredge outer harbor to a 
depth of 20 feet. 
Remove portion of east breakwater, extend breakwaters to 
present project dimensions, and dredging restrictions 
in portion of west basin. 
Dredge channel through outer harbor, channel of approach 
to Penn Central Co. slip, channel in Ashtabula River, 
to and in turning basin, all to present project 
dimensions; remove portion of old east inner 
breakwater; and maintenance to 24-foot depth of 
portion of outer harbor. 
Extend river channel to present project limit. 
Dredging approach channel and turning basin in east 
outer harbor to 25-foot depth. 
A depth of 29 feet in soft and 30 feet in hard material 
in entrance channel to just inside outer ends of 
breakwaters; thence 28 feet in soft and 29 feet in 
hard material in a channel to inner breakwater; thence 
27 feet in soft and 28 fet in hard material in a channel 
extending to Penn Central Co. slip and extending 2000 
feet up Ashtabula River; 22 feet in hard material in 
turning area; and 28 feet in soft and 29 feet in hard 
material in areas adjacent to 250-foot section of inner 
breakwater when that section i s removed as now authorized. 
Dredging approach channel and turning basin in east 
outer harbor to 28 feet in soft material and 29 feet 
in hard material. 
BLACK ROCK CHANNEL AND TONAWANDA HARBOR, N. Y. 
(See Section 3 of Text) 
Dredging channel through Horseshoe Reef at outlet of 
Lake Erie and Tonawanda Inner Harbor, to 16 feet. 
Deepening Tonawanda Creek to 16 feet. 
Dredging channel from Buffalo outer harbor to foot of 
Maryland St., Buffalo, to 21 feet. 
Dredging channel from foot of Maryland St., Buffalo, 
to natural deepwater pool upstream from Tonawanda 
Harbor to 21 feet; construction of ship lock and 
bridge; and repair of Bird Island pier and towpath 
wall. 
Dredging channel along Tonawanda Island, with turning 
basin at its downstream end at the foot of the Island, 
to 21 feet. 
Dredging triangular area at junction with Buffalo north 
entrance channel. 
Widening channel at foot of Maryland St., Buffalo. 
Widening canal south of International Bridge and 
removal of westerly end of Rattlesnake Island shoal. 
Operation and care of improvements provided for with 
funds from War Department appropriations for rivers 
and harbors. 
967 
TABLE 31-B 
Annual Report, 1895, p. 2132. 
H. Doc. 654, 61st Cong., 2d sess. 
H. Doc. 997, 64th Cong., 1st sess. 
H. Doc. 43, 73d Cong., 1st sess. 
Rivers and Harbors Committee Doc. 
78, 74th Cong., 2d sess.2 
H. Doc. 321, 77th Cong., 1st sess. 
H. Doc. 486, 83d Cong., 2d sess. 
H. Doc. 148, 86th Cong., 1st sess. 3 
H. Doc. 269, 89th Cong., 1st sess. 4 
H. Ex. Doc. 83, 50th Cong., 1st sess., 
Annual Report, 1888, p. 2066, and 
Annual Report, 1897, pp. 3116-3120. 
H. Doc. 143, 56 Cong., 1st sess., and 
Annual Report, 1900, p. 4152. 
H. Doc. 125, 56th Cong., 2d sess., and 
Annual Report, 1901, p. 3343. 
H. Doc. 428, 58th Cong., 2d sess. 
H. Doc. 658, 63d Cong., 2d sess. 
H. Doc. 1004, 65th Cong., 2d sess., and 
H. Doc. 92, 79th Cong., 1st sess. 
H. Doc. 981, 66th Cong., 3d sess. 
H. Doc. 289, 68th Cong., 1st sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 31-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 30, 1935" 
Mar. 2, 1945 
Sept 3, 1954 
May 20, 1826 
June 23, 1866 
June 23, 1874 
June 3, 1896 
Mar. 3, 1899 
Mar. 3, 1909 
June 6, 1900 
June 13, 1902 
Mar. 2, 1907 
Mar. 2, 190710 
June 25, 1910 
July 25, 1912 
Mar. 2, 1919 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 193511 
Aug. 30, 1935 
Mar. 2, 1945 
July 14, 1960 
Oct. 23, 1962 
Removal of rock shoals in Lake Erie entrance to canal, 
and in canal south of Ferry Street Bridge, to 22 feet; 
enlargement of North Tonawanda turning basin; extension 
of Bird Island pier; improvement of guide pier at the 
lock; and elimination of upper 150 feet of Tonawanda 
Creek channel from the project. 
Widening Lake Erie entrance to canal. 
Deepen lower 1,500 feet of Tonawanda inner harbor and 
enlarge turning basin. 
BUFFALO HARBOR, N. Y. (See Section 4 of Text) 
Construction of south pier (extended in 1868)9 
Construction of old breakwater.9 
Extension of old breakwater. 9 
Stony Point and south breakwater.9 
North breakwater.9 
Deepening entrance channel to inner harbor and 
removing rock shoal therein. 
Dredging at entrance to canals at South Buffalo in 
outer harbor.1 
South entrance breakwater. 9 
Extension of Federal project to Commercial St. and 
removal of Watson elevator site.9 
Deepening areas A, B, and Din outer harbor to 21 
feet, and area C in north entrance to 23 feet. 
Deepening areas F and G in outer harbor to 21 feet. 
Removal of shoal between entrance channel to Buffalo 
River and Erie Basin to 21 feet. 
Deepening areas H, I, and K in outer harbor to 21 feet. 
Extension of south entrance and south breakwaters, 
deepening outer harbor to present project dimensions, 
and removal of shoals on approach to south entrance. 
Maintenance of channels in Buffalo River and Buffalo 
ship canal to 21 feet, in cooperation with city of 
Buffalo. 
Deepening North and Buffalo River entrance channels, 
and deepening and maintaining Buffalo River and 
Buffalo ship canal to present project dimensions. 
Deepening approach to south entrance channel to 30 
feet; deepen to 30 feet in outer area and 29 feet in 
inner area of south entrance channel; and deepen to 
28 feet southerly part of outer harbor. 
Deepening portion of outer harbor to 27 feet over a 
width of 500 feet for 2,500 feet northward from 
28-foot project area, widening within 1,700 feet to 
limits within 150 feet of breakwater axis and 75 feet 
from harbor line and continuing within these limits 
for 7,000 feet. Elimination of 25-foot wide strip 
between presently authorized and proposed easterly 
dredging limits. Elimination of easterly 50-foot 
wide undredged strip in existing 23-foot depth 
project area, extending northerly from 27-foot 
depth area to Buffalo River entrance channel 
Previously authorized but uncompleted portions of 
work authorized by 1935 act, combined with this 
act as a single improvement. 
H. Doc. 28, 73d Cong., 1st sess. 
H. Doc. 92, 79th Cong., 1st sess. 4 
H. Doc. 423, 83rd Cong., 2d sess.4 , 8 
Annual Report, 1868, pp. 222 and 
232. 
Annual Report, 1868, pp. 232-236. 
Annual Report, 1876, pt. 2, pp. 569 
and 573. 
Annual Report, 1895, p. 3153. 
H. Doc. 72, 55th Cong., 1st sess., 
and Annual Report, 1897, p. 3245. 
Specified in acts. 
Specified in act. 
H. Doc. 240, 59th Cong., 1st sess. 
H. Doc. 298, Rivers and Harbors 
Committee Doc. 2, 61st Cong., 
2d sess. 
H. Doc. 550, 62d Cong., 2d sess. 
H. Doc. 1139, 64th Cong., 1st sess. 
H. Doc. 481, 68th Cong., 2d sess. 
Rivers and Harbors Committee Doc. 1, 
71st Cong., 1st sess. 
H. Doc. 46, 73d Cong., 1st sess. 
Rivers and Harbors Committee Doc. 54, 
74th Cong., 1st sess. 
H. Doc. 352, 78th Cong., 1st sess. 1 
H. Doc. 151, 86th Cong., 1st sess. 
H. Doc. 451, 87th Cong., 2d sess. 4 
968

TABLE 31-B (Cont'd) 
BUFFALO, N., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 3, 1875 
Aug. 5, 1886 
Aug. 11, 1888 
June 3, 1896 
Mar. 3, 1899 
June 13, 1902 
June 13, 1902 
Mar. 2, 1907 
June 25, 1910 
July 27, 1916 
Aug. 8, 1917 
Aug. 29, 1937 
Aug. 30, 193512 
Aug. 30, 193513 
Mar. 2, 194514 
July 24, 1946 
July 3, 1958 
July 14, 1960 
CLEVELAND HARBOR, OHIO (See Section 5 of Text) 
West breakwater. 9 
Part of east breakwater. 9 
Extension of east breakwater. 9 
Reconstruction of piers. 
Dredging channel between piers and outer harbor to 
depth of 19 feet; dredging to depth of 23 feet in 
any portion of harbor in discretion of Secretary of 
War. 
Arrowhead breakwater and extension of east breakwater. 
Removal of deflecting arm of old east breakwater and 
closure of gap between old and new east breakwaters. 
Pierhead at easterly end of east breakwater. 
Maintenance and improvement of channels in Cuyahoga and 
Old Rivers to a depth of 21 feet to a point 2,000 
feet upstream from Clark Ave. viaduct and 18-foot 
turning basin. 
Deepening outer harbor and channel between piers to 
present project dimensions, construction of 400-foot 
spur breakwater at gap in shore arm of west 
breakwater; removal of easterly 150 feet of west main 
breakwater; elimination from project of a 298-foot 
southerly extension of west pier; and abandonment of 
inner 932 feet of shore arm of west breakwater. 
Maintenance dredging in Cuyahoga and Old Rivers for 
1 year as an emergency measure. 
Maintenance of extension of Cuyahoga River channel. 
Extension, maintenance, and improvement to a depth of 
21 feet of Cuyahoga River channel to present project 
limit. 1 5 
,16 
Improvement of Cuyahoga and Old Rivers to a depth of 
23 feet and replacement or pier construction of 7 
railroad bridges. 
Deepening channel 25 feet through east basin of outer 
harbor; replacement of Erie-Lackawanna Railroad 
bridge over Cuyahoga River at mile 4.1 and 
widening of channel at that point, with elimination 
of reconstruction of east pier of bridge as 
previously authorized; and replacement of Baltimore 
& Ohio Railroad bridge over Old River near its mouth 
and Willow Avenue Highway Bridge about 800 feet 
above mouth and widening channel at four locations 
along lower 2,000 feet of river. 
Depth of 29 feet in lake approach to main entrance; 
28 feet in entrance channel to lakeward ends of 
piers at mouth of Cuyahoga River; 27 feet in river 
to a point just above its junction with Old River, 
and in Old River to upstream limit of present 
23-foot project; 28 feet in west basin within 
existing project limits as modified to eliminate a 
triangular area at west end and to extend limits to 
a line parallel to and 75 feet from harbor line; 
and 28 feet in westerly 800 feet of east basin. 
Annual Report, 1876, p. 558. 
H. Ex. Doc. 116, 48th Cong., 2d sess., 
and Annual Report, 1886, p. 1865. 
H. Ex. Doc. 189, 50th Cong., 1st sess., 
and Annual Report, 1888, p. 2005. 
H. Doc. 326, 54th Cong., 1st sess., 
and Annual Report, 1896, p. 2949. 
H. Doc. 156, 55th Cong., 3d sess., 
and Annual Report, 1899, pp. 3075 
and 3078. 
H. Doc. 118, 56th Cong., 2d sess. 
No printed report. 
H. Doc. 891, 63d Cong., 2d sess. 
H. Doc. 707, 63d Cong., 2d sess., 
and Rivers and Harbors Committee 
Doc. 84, 74th Cong., 2d sess. 
H. Doc. 477, 72d Cong., 2d sess. 
Rivers and Harbors Committee 
Doc. 39, 74th Cong., 1st sess. 
Specified in act. 
H. Doc. 95, 79th Cong., 1st sess. 
4 
H. Doc. 629, 79th Cong., 2d sess. 
H. Doc. 107, 85th Cong., 1st sess. 
H. Doc. 152, 86th Cong., 1st sess. 
969

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 31-B (Cont'd) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
Oct. 23, 1962 
Dec. 6, 1966 
June 25, 1910 
Aug. 8, 1917 
17 
Aug. 30, 193511 
Oct. 23, 1962 
Nov. 7, 1966 
Mar. 2, 1827 
Mar. 2, 1867 
June 3, 1896 
June 25, 1910 
June 30, 1948 
An area in east basin 27 feet deep extending about 
3,800 feet easterly of 28-foot area with project 
limits 380 feet from east breakwater and on 
landward side generally by a line 75 feet lakeward 
of and parallel to harbor line. A dock channel to 
Nicholson Cleveland Terminal Co. pier, at easterly 
end of east basin, from 25-foot contour to a limit 
75 feet north of pierhead line, 400 feet wide at 
shoreward end and flared toward the lake. 
Deepening upper end of Old River channel from 21 to 
27 feet. 
CONNEAUT HARBOR, OHIO (See Section 6 of Text) 
Extension of east breakwater, construction of new west 
breakwater; removal of portion of old west breakwater; 
and dredging of outer harbor to 19 feet. 
Realinement of west breakwater; removal of remainder of 
old west breakwater, and deepening outer harbor to 
20 feet. 
Removal of Bessemer & Lake Erie R.R. Co. of inner 
635 feet of west pier. 
Removal of a portion of west breakwater; extension of 
breakwaters to present project dimensions; 
construction of pierheads on outer ends of 
breakwaters; deepening outer harbor to present 
project dimensions; removal of portions of river 
pier, and elimination from project of a 255-foot 
shoreward extension of west breakwater. 
Deepening easterly part of outer harbor to 28 feet in 
soft material and 29 feet in hard material; deepening 
remaining triangular area of outer harbor to 22 feet 
in soft material and 23 feet in hard material; 
deepening inner harbor for 2,450 feet upstream of 
outer end of west pier to 27 feet in soft material 
and 28 feet in hard material; removal of east pier; 
extension of east breakwater to shore; and an access 
channel 8 feet deep in outer harbor to city dock. 
Previously authorized but uncompleted portion of 
work authorized by 1917 and 1935 acts combined with 
this act for accomplishment as a single improvement. 
Recreational small-boat harbor provided by: a stone 
dike about 2,200 feet long; access channels 6 feet 
deep, 2,800 feet long and 100 feet wide; closing of 
100-foot gap in existing west breakwater; and 
personnel guard rail on west breakwater. 
DUNKIRK HARBOR, N. Y. (See Section 7 of Text) 
Construction of west pier.9' 1 8 
Breakwater and excavation of entrance channel to 13 feet. 9 
Deepening of entrance channel and harbor basin to a 
depth suitable for vessels of 16-foot draft.9 
Removal of rock reef bordering the inner entrance 
channel. 
Deepening outer entrance channel to present project 
depths; removal of rock shoal on the west side of the 
entrance channel to a depth of 17 feet, and changed 
limits of the inner entrance channel and basin to 
present project dimensions. 
H. Doc. 527, 87th Cong., 2d sess. 4 
Sec. 107, 1960 River and Harbor Act. 
H. Doc. 653, 61st Cong., 2d sess. 
H. Doc. 983, 64th Cong., 1st sess. 
H. Doc. 48, 73d Cong., 1st sess. 
H. Doc. 415, 87th Cong., 2d sess. 
H. Doc. 484, 89th Cong., 2d sess.4 
S. Ex. Doc. 42, 35th Cong., 1st sess., 
and Annual Report, 1866, pt. IV, 
p. 155. 
Annual Report, 1871, p. 214. 
H. Doc. 63, 54th Cong., 1st sess. 
H. Doc. 720, 61st Cong., 2d sess. 4 
H. Doc. 632, 80th Cong., 2d sess. 
970 
Documents

TABLE 31-B (Cont'd) 
BUFFALO, N., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
ERIE HARBOR, PA. (See Section 8 of Text) 
May 26, 1824 
Mar. 3, 1899 
June 15, 1910 
Nov. 28, 192220 
Aug. 30, 1935 
Mar. 2, 1945 
Mar. 2, 1945 
Sept. 3, 1954 
July 14, 1960 
Oct. 23, 1962 
Mar. 3, 182521 
June 3, 1896 
Mar. 3, 1905 
Mar. 2, 1919 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 193522 
Aug. 26, 1937 
July 24, 1946 
Breakwaters and piers; dredging entrance channel; and 
brushwood protection of beach of Presque Isle 
Peninsula.9 
Deepening channel and harbor basin to 18 feet; repair 
and extension of piers; and plant growth and 
emergency protection work on peninsula. 
Deepening channel and part of harbor to 20 feet. 
Reconveyed Presque Isle Peninsula to the State of 
Pennsylvania for park purposes. 
Deepening, widening, and straightening entrance channel, 
dredging channel at easterly end of harbor basin, 
deepening a portion of harbor basin, all to present 
project dimensions; elimination of north breakwater 
from project; and limitation of south breakwater to 
a length of 1,200 feet. 
Approach channel and turning basin to the westerly docks. 
Protection of the peninsula sough of the waterworks 
settling basin. 
Widen 25-foot deep approach channel to ore dock. 
Depth of 29 feet in the entrance channel to a point 
opposite the inner end of the north pier; thence 28 
feet in soft and 29 feet in hard material in the 
remainder of the entrance channel, within the general 
limits of the 25-foot basin and inner channel 
opposite the ore dock except as modified to eliminate 
from the project a triangular area along the easterly 
side; and a depth of 28 feet over a 300-foot 
westward extension of the 25-foot basin. 
Depth of 27 feet in soft material and 28 feet in hard 
material in approach area to Duquesne Marine 
Terminal. Previously authorized but uncompleted 
portion of work authorized by 1935 act is combined 
with this act as a single improvement. 
FAIRPORT HARBOR, OHIO (See Section 9 of Text) 
Construction of piers. 
Breakwaters and dredging outer harbor to a depth of 
18 feet. 
1,400-foot extension of east breakwater, present 
project dimension of east pier; and deepening of 
harbor to 19 feet. 
4,000-foot extension of east breakwater at limit of 
cost to the United States of $715,000. 
Deepening of outer harbor and entrance channel to 
present project dimensions; extending the west 
breakwater to present project dimensions with 
pierhead at its outer end; removal of west pier; 
and construction of bulkhead on west side of river 
channel. 
Dredging of 21- and 24-foot river channels and 
turning basin in Grand River to present project 
dimensions. 
Dredging of 8-foot river channel. 
Annual Report, 1915, p. 1965. 
H. Doc. 70, 55th Cong., 1st sess. 
and Annual Report, 1897, p. 3237.19 
Rivers and Harbors Committee Doc. 
26, 61st Cong., 2d sess. 
H. Doc. 52, 73d Cong., 1st sess. 
H. Doc. 735, 79th Cong., 2d sess. 
Specified in act. 
H. Doc. 345, 83d Cong., 2d sess. 
H. Doc. 199, 86th Cong., 1st sess. 4 
H. Doc. 340, 87th Cong., 2d sess. 4 
Annual Report, 1889, pp. 2147-2153. 
H. Doc. 347, 54th Cong., 1st sess., 
and Annual Reports, 1896, p. 2956; 
1903, p. 2084; 1905, p. 2349. 
H. Doc. 206, 63d Cong., 1st sess. 
H. Doc. 592, 69th Cong., 2d sess., 
Rivers and Harbors Committee Doc. 
13, 70th Cong., 1st sess. 
H. Doc. 472, 72d Cong., 2d sess. 
Rivers and Harbors Committee Doc. 
79, 74th Cong., 2d sess.4 
H. Doc. 706, 79th Cong., 2d sess. 4 
971

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 31-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 14, 1960 
Mar. 2, 1829 
Aug. 2, 1882 
Mar. 3, 1925 
July 3, 1930 
Aug. 30, 1935 
Oct. 23, 1962 
Mar. 3, 1905 
Mar. 2, 1919 
Aug. 30, 193522 
Oct. 23, 1962 
Aug. 30, 1852 
June 23, 1866 
Mar. 3, 1871 
Mar. 3, 1881 
June 13, 1902 
Depth of 29 feet in the approach channel from the lake; 
a depth of 28 feet over a width of 800 feet in the 
outer harbor; a depth of 27 feet in soft and 28 feet 
in hard material in Grand River, over a width of 200 
feet to the upstream limit of the turning basin, with 
suitable widening at the bends, thence over widths 
reducing from 200 to 100 feet to the upstream limit 
of the existing Federal project, except in the 8-foot 
channel; enlargement of the turning basin, including 
deepening of the entire basin to 21 feet; and minor 
modification of the existing project limits in the 
outer harbor. 
GREAT SODUS BAY HARBOR, N. Y. (See Section 10 of Text) 
Construction of piers and breakwater.9 
Extension of piers to 15-foot contour in the lake. 
Deepening and widening of channel to 18-foot depth and 
150-foot width. 
Widening channel lakeward of piers to 250 feet. 
Dredging channel to present project dimensions. 
Deepening lake approach channel from lake to piers; 
entrance channel 24 feet deep between piers to deep 
water bayward of piers and an inner channel 22 feet 
deep and 200 feet wide in bay to turning basin at 
coal dock. 
HURON HARBOR, OHIO (See Section 11 of Text) 
Extension of west pier; construction of east breakwater; 
removal of part of old east pier; deepening of channel 
to 19 feet; and dredging of sheltered area. 
Widening river to 200 feet; removal of remainder of old 
east pier; construction of new spur pier; enlargement 
of sheltered area; and closure of breach at shore end 
of west pier. 
Extension of west pier with pierhead at its outer end; 
removal of outer end of east breakwater and 
constructing pierhead on new outer end; widening and 
deepening channel to present project dimensions; 
enlargement of turning basin at head of channel; 
shore protection west of west pier; and elimination 
from project construction of spur pier and dredging 
sheltered area outside channel limits. 
Depths of 29 feet in approach channel, 28 feet in 
entrance channel, 27 feet in river channel, 21 feet 
in turning basin, a detached breakwater 1,575 feet 
long 2,000 feet lakeward of outer end of existing 
west pier; and, abandonment of lakeward end of 
existing approach channel. 
LITTLE SODUS BAY HARBOR, N. Y. (See Section 13 of Text) 
West entrance pier.9 
Extension of west pier and construction of west 
breakwater, and dredging channel 12 feet deep, 
400 feet wide.9 
East pier and east breakwater.9 
Extension of piers lakeward to 15.5-foot contour, and 
dredging channel to 15.5 feet. 
Extension of east pier 300 feet lakeward. 
H. Doc. 347, 86th Cong., 2d sess. 4 
Annual Report, 1876, pt. II, p. 589. 
Annual Report, 1881, p. 2442. 
H. Doc. 192, 68th Cong., 1st sess. 
Rivers and Harbors Committee Doc. 17, 
70th Cong., 1st sess. 
Rivers and Harbors Committee Doc. 23, 
72d Cong., 1st sess. 
H. Doc. 138, 87th Cong., 1st sess. 4 
H. Doc. 122, 58th Cong., 2d sess. 
H. Doc. 5, 63d Cong., 1st sess. 
H. Doc. 478, 72d Cong., 2d sess. 
H. Doc. 165, 87th Cong., 1st sess.4 
Annual Report, 1874, p. 256. 
Annual Report, 1874, p. 256. 
Annual Report, 1871, p. 234. 
Annual Report, 1881, pp. 2444 and 
2446. 4 
Annual Report, 1901, p. 3364. 
972

TABLE 31-B (Cont'd) 
BUFFALO, N., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 3, 1899 
Mar. 2, 1907 
June 25, 1910 
Aug. 8, 1917 
Aug. 8, 1917 
July 3, 1930 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 30, 1935 
23 
Mar. 2, 1945 
July 14, 1960 
Oct. 27, 1965 
June 25, 1910 
Mar. 2, 1919 
Aug. 30, 193512 
July 11, 1870 
Mar. 2, 1907 
July 3, 1930 
Aug. 30, 1935 
LORAIN HARBOR, OHIO (See Section 14 of Text) 
Breakwaters and extensions of piers to present dimensions. 
Extend 18-foot channel from inner end of piers to Erie 
Avenue Bridge. 
Extend breakwaters and dredge to depth of 19 feet in outer 
harbor. 
Extend breakwaters to present project dimensions. 
Deepen outer harbor and river channel to Erie Avenue 
Bridge to 20 feet. 
Extend 20-foot channel to American Shipbuilding Co. 
drydock 2. 
Widen 2 bends in river and enlarge turning basin opposite 
National Tube Co. dock.1 2 
Approach channel to municipal pier. 
Deepen outer harbor and river channel to American 
Shipbuilding Co. drydock 2 to present project 
dimensions and extensions of river channel to upper 
end of National Tube Co. dock with turning basin 
opposite that dock. Maintenance dredging in Black River 
from American Shipbuilding Co. drydock 2 upper end of 
National Tube Co. dock was authorized Apr. 7, 1934, by 
Public Works Administration. 
Enlarging turning basin opposite National Tube Co. dock 
to present project dimensions. 
Turning basin in bend of Black River immediately 
upstream from Baltimore & Ohio RR coal dock. 
Replace Norfolk and Western Railway swing bridge with a 
vertical lift bridge; construct two detached arrowhead 
breakwaters lakeward of existing breakwaters; construct 
extension of east breakwater to shore; remove 300 feet 
of lakeward end of west breakwater; remove outer 1,100 
feet of east pier; deepen lake approach to 29 feet, 
800-foot wide outer harbor channel to 28 feet, 
southwesterly portion of outer harbor to 25 feet and 
river channel to 27 feet; widen river channel at bends; 
and construct a new turning basin 21 feet deep near 
upstream limit of existing project. 
Construct bank stabilization works at cut numbered 1 along 
left bank of river channel above Erie Avenue Bridge. 
OGDENSBURG HARBOR, N. Y. (See Section 16 of Text) 
Deepening the several channels to 19 feet. 
Widening upper entrance channel to 400 feet, and city 
front to 350 feet. 
Enlarging and deepening lower basin to 21 feet, and 
removal of old elevator wharf. 
OSWEGO HARBOR, N. Y. (See Section 17 of Text) 
Construction of outer west breakwater. 9 
Repair of outer west breakwater under plan (A).9 
Construction of arrowhead breakwaters; deepening outer 
harbor between arrowhead breakwaters, west outer 
harbor east of Erie-Lackawanna coal dock, and Oswego 
River north of Seneca St., to 21 feet; and deepening 
west outer harbor, west of Erie-Lackawanna coal dock, 
to 16 feet.2 5 
Widening channel to harbor lines in Oswego River north 
of Seneca St. 
H. Doc. 131, 55th Cong., 2d sess. 
and Annual Report, 1898, p. 2718. 
H. Doc. 560, 60th Cong., 1st sess. 
H. Doc. 644, 61st Cong., 2d sess. 
H. Doc. 980, 64th Cong., 1st sess. 
H. Doc. 985, 64th Cong., 1st sess. 
H. Doc. 587, 69th Cong., 2d sess. 
H. Doc. 469, 72d Cong., 2d sess. 
Senate Committee print, 73d Cong., 
2d sess. 
Rivers and Harbors Committee Doc. 51, 
74th Cong., 1st sess. 
Specified in act. 
H. Doc. 161, 77th Cong., 1st sess. 
H. Doc. 166, 86th Cong., 1st sess.4 
PL 89-298. 
H. Doc. 920, 60th Cong., 1st sess. 
H. Doc. 663, 74th Cong., 1st sess.
4 24 
H. Doc. 266, 72d Cong., 1st sess.24 
Annual Report, 1870, pp. 54, 220, 
and 221. 
H. Doc. 55, 58th Gong., 2d sess. 
Rivers and Harbors Committee Doc. 24, 
71st Cong., 2d sess. 
Rivers and Harbors Committee Doc. 7, 
74th Cong., 1st sess. 
973 
451-584 0-72-62

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 31-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 17, 1940 
June 30, 1948 
Sept. 3, 1954 
Oct. 23, 1962 
Mar. 2, 1829 
Aug. 2, 1882 
June 25, 1910 
Aug. 30, 19356 
Mar. 2, 1945 
July 14, 1960 
June 10, 1872 
Aug. 26, 1937 
Oct. 27, 1965 
Mar. 3, 1899 
June 13, 1902 
Mar. 2, 1919 
Jan. 21, 1927 
Closing gap in west breakwater; deepening west outer H. Doc. 96, 76th Cong., 1st sess. 
harbor, west of east line of Erie-Lackawanna coal 
dock, to project depth. 
Construction of east outer breakwater; removal of inner 
end of east arrowhead breakwater; and dredging 
channel and basin in east outer harbor.2 6 
Construction of detached breakwater at harbor entrance 
and removal of shoals in approach to harbor entrance 
to 25 feet deep. 
Depth of 27 feet in lake appoach channel; 25 feet deep 
in outer harbor channel 800 feet wide from entrance 
gap to a turning basin 25 feet deep about 750 by 
1,100 feet, at mouth of Oswego River; depth of 24 
feet in earth and 25 feet in hard material in river 
channel from turning basin to upstream end of Port 
of Oswego Authority's east side terminal, a distance 
of about 1,600 feet; relocation of Federal project 
limits in Oswego River upstream of 24-foot channel 
to Federal project limit at north line of West Seneca 
St., on lines parallel to 50 feet channel ward of 
established harbor lines; elimination of maintenance 
of inner west breakwater; and, elimination of modification 
authorized by River and Harbor Act of 1948. 
ROCHESTER HARBOR, N. Y. (See Section 18 of Text) 
Construction of piers.9 
Extension of piers to 15 foot contour in the lake.9 
Concrete superstructure on piers. 9 
Deepening channel to 20 feet. 
Dredging of the entrance channel and turning basin, and 
the elimination of the inner ends of the east and west 
piers, all to present project dimensions. 
Maintenance of the existing channel upstream of the 
Penn Central Co. bridge. 
Depth of 24 feet in the channel from the lake to the west 
pier; a depth of 23 feet between the piers and in the 
lower river to the Penn Central Co. bridge, including 
the existing turning basin; a depth of 21 feet from the 
bridge to the upstream project limit, with suitable 
widening at the bends; and, an upstream turning basin 
21 feet deep and 650 feet wide adjacent to the improved 
channel, with two mooring dolphins. 
ROCKY RIVER HARBOR, OHIO (See Section 19 of Text) 
East pier and dredging of channel. 
Extension of east pier and deepening channel to present 
project dimensions. 
Realign and extend channel and construct an anchorage 
basin. 
974 
H. Doc. 722, 80th Cong., 2d sess. 
H. Doc. 487, 81st Cong., 2d sess. 
H. Doc. 471, 87th Cong., 2d sess., 4 
Annual Report, 1874, p. 247. 
Annual Report, 1881, p. 2437. 
Annual Report, 1905, p. 2383. 
H. Doc. 342, 61st Cong., 2d sess. 
H. Doc. 484, 72d Cong., 2d sess. 4 
H. Doc. 139, 76th Cong., 1st sess. 
H. Doc. 409, 86th Cong., 2d sess. 4 
Annual Report, 1871, p. 211. 
H. Doc. 70, 75th Cong., 1st sess. 
H. Doc. 352, 88th Cong., 2d sess. 4 
H. Doc. 362, 55th Cong., 2d sess., 
and Annual Report, 1898, p. 2708. 
H. Doc. 120, 56th Cong., 2d sess. 
H. Doc. 982, 64th Cong., 1st sess. 
H. Doc. 584, 69th Cong., 2d sess. 
SANDUSKY HARBOR, OHIO (See Section 20 of Text) 
Construction of channel protection works. 
Widening of straight and dock channels and deepening to 
19 feet. 
Extension of east jetty to total length of 6,000 feet, 
with pierhead on outer end; deepening of the outer, 
straight, and easterly portion of dock channels to 
21 feet, and westerly portion of dock channel to 
20 feet. 
Deepening of dock channel to 22 feet.

TABLE 31-B (Cont'd) 
BUFFALO, N., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 30, 193527 Enlargement of turning basin and construction of rock dike. Rivers and Harbors Committee Doc. 2, 
73d Cong., 1st sess. 
Mar. 2, 1945 Maintenance of bay channel to 22 feet; and elimination H. Doc. 328, 76th Cong., 1st sess. 
from project of portion of turning basin and rock dike. 
July 14, 1960 Extending Moseley channel and deepening that channel and H. Doc. 144, 86th Cong., I1st sess.4 
the outer end of Straight channel to 26 feet, from deep 
water in the lake to the vicinity of Cedar Point dock; 
widening the bend at the junction of the Moseley and 
Straight channels and deepening to 26 feet; deepening 
the Straight Channel to 25 feet from the vicinity of 
Cedar Point dock to junction with Bay channel; 
deepening the Bay channel from junction with the 
Straight channel to the outer end of the Pennsylvania 
coal dock No. 3 to 25 feet, thence from outer end of 
the coal dock to the turning basin to 24 feet in soft 
material and 25 feet in hard, with no Federal 
dredging within 50 feet of the dock; and enlarging 
the turning basin, including removal of approximately 
300 feet of the rock dike, and deepening to 24 feet 
in soft material and 25 feet in hard. 
VERMILION HARBOR, OHIO (See Section 21 of Text) 
July 4, 1836 Parallel piers and dredging channel to 8 feet deep. Annual Report, 1880, p. 2122. 
Mar. 3, 1875 Deepening of channel to 12 feet. Annual Report, 1874, p. 219. 
Mar. 3, 1905 Reconstruction of piers. H. Doc. 252, 58th Cong., 2d sess. 
July 3, 1958 New entrance formed by two overlapping arrowhead H. Doc. 231, 85th Cong., 1st sess. 
breakwaters and extension of existing river channel 
upstream to Liberty St. Bridge. 
PRESQUE ISLE PENINSULA, ERIE, PA. (See Section 26 of Text) 
Sept. 3, 1954 Construction of groin system, seawall, bulkhead, H. Doc. 231, 83d Cong., 1st sess. 
placement of beach material at waterworks reservation 
and along remainder of peninsula; removal of portions 
of existing structures. 
July 14, 1960 Periodic nourishment of shore for a 10-year period. H. Doc. 397, 86th Cong., 2d sess. 
1. Authorized by Public Works Administration, Sept. 6, 
1933. 
2. Removal of 250 feet of inner east breakwater is to be 
restudied. 
3. Deepening of triangular-shaped area in the harbor adjacent 
to inner breakwater is to be restudied. 
4. Contains latest published map. 
5. Permanent Appropriations Repeal Act. 
6. Authorized May 28, 1935 by Emergency Relief Administration 
Act of 1935. 
7. Improvement of guide pier at Black Rock lock is 
considered to be inactive. 
8. To be restudied. 
9. Completed under previous projects. 
10. Also Sundry Civil Act of Mar 3, 1905. 
11. Authorized in part by Public Works Administration, Sept. 
6, 1933. 
12. Authorized by Public Works Administration Sept. 6, 
1933. 
13. Previously authorized by Public Works Administration. 
14. First Deficiency Appropriation Act approved April 1, 
1944. 
15. Authorized by Defense Plant Corp., May 19, 1942. 
16. Deepening left half of channel extension considered 
inactive. 
17. Permit of Secretary of War, Aug. 5, 1927. 
18. Modified 1828 and 1852. 
19. Extension of north pier portion of this modification is to 
be restudied. 
20. Public 366. 
21. Modified 1830, 1881 and 1890. New work completed 
under previous projects. 
22. Partly included in Public Works Administration program, 
Nov. 15, 1933. 
23. First supplemental National Defense Appropriation Act, 
1944, approved Dec. 23, 1943. 
24. Removal of remaining hard-material shoals in lower basin 
is considered to be inactive. 
25. Deepening a 200-foot strip along harbor line east of 
mouth of Oswego River is considered inactive. 
26. Modification eliminated by River and Harbor Act of Oct. 
23, 1962. 
27. Included in Public Works Administration program, Nov. 
15, 1933. 
975

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 31-C OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 23 of Text) 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Barcelona Harbor, N.Y. 1966 $ 1,136,7371,10 $ 4,234 
Big (Cunningham) Creek, Ohio2 _3 19,7634 
Black River Harbor, N.Y.5 _ 3 42,401 
Cape Vincent, N.Y.7 1962 275,082 40,777 
Cattaraugus Creek, N.Y.6 _ 3 57,410 
Cattaraugus Harbor, N.Y. 
Elk Creek, Pa. - - - 
Grand View Bay, N.Y. 7 1948 1,524 - 
Grasse River (Massena) N.Y. 5'8 1891 9,0004 - 
Hamlin Beach Harbor, N.Y. - - 
Little River at 
Cayuga Island, N.Y. 1969 46,8049 42,355 
Niagara Remedial Works, N.Y.O, 1 1 1966 6,069,395 510,819 
Niagara River, N.Y. 1966 559,45712 137,951 
Morristown Harbor, N.Y. 1949 6,22110 9,202 
Olcott Harbor, N.Y. 1966 201,97713 315,01914 
Port Bay, N.Y.7 - - - 
Port Ontario, Harbor, N.Y. 1949 56,904 - 
Pultneyville Harbor, N.Y.1s 1934 68,219 20,087 
Sackets Harbor, N.Y.16 1948 25,010'7 2,639 
Sandusky River, OhioS 1894 58,0004 557 
Wilson Harbor, N.Y. 1964 394,10410 73,659 
1. Includes local interests contribution of $7,500. 
2. No commerce reported. 
3. Only information available is in index to reports of Chief 
of Engineers. 
4. Amount includes maintenance; not separable. 
5. Abandonment recommended in H. Doc. 467, 69th Cong., 
1st Sess. 
6. Abandonment recommended in Exc. Doc. 16, 35th 
Cong., 1st Sess. 
7. To be restudied. 
8. Channel improved by local interests. 
9. Includes local interests contribution of $25,742. 
10. Completed. 
11. Costs of operation and maintenance of this project will be 
settled directly by concerned power agencies. No further 
appropriations will be made to this project. 
12. Includes local interests contribution of $27,563. 
13. Includes local interests contribution of $1,500. 
14. Includes local interests contribution of $5,000. 
15. Abandonment recommended in H. Doc. 375, 64th Cong., 
1st Sess. 
16. Inactive. Completion not warranted by present navigation 
traffic. 
17. Includes costs of previous project. 
976

BUFFALO, N., DISTRICT 
TABLE 31-D OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
(See Section 27 of Text) 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Cleveland and Lakewood, Ohio: 
Edgewater Park,2$ - $ 
White City Park1 -,2 
Fair Haven Beach State Park, 
Lake Ontario, N.Y.3 
Selkirk Shores State Park, 
Lake Ontario, N.Y.4 1963 58,978 
Sheffield Lake Community Park, Ohio5 
Vermillion to Sheffield Lake Village, 
Ohio2 
1. To be restudied. 
2. Project was authorized by River and Harbor Act of 
September 3, 1954. 
3. Project was authorized by River and Harbor Act of July 
3, 1954. 
TABLE 31-E 
4. Federal participation was limited to one-third of first cost 
when project was authorized by 1954 River and Harbor Act. 
Federal participation was changed from one-third to 70 percent 
of remaining work under Public Law 87-874. 
5. Project was authorized by River and Harbor Act of 
October 23, 1962. 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 37 of Text) 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Auburn, N.Y., Owasco Outlet1 1962 $ 371,985 $ - 
Batavia and vicinity, Tonawanda Creek, 
N.Y.1 
1957 335,385 
Caledonia, Genesee River, N.Y.2 1950 
Chittenango Creek and tributaries, 
N.Y.3 ,4 
1948 12,464 
Dansville and vicinity, Genesee River, N.Y.4 1956 12,800 
Hammondsport, Oswego River Basin, N.Y. 2 1951 18,691 
Ithaca, Oswego River Basin N.Y.: 
Deferred-Cascadilla Creek" 1950 8,159 
Deferred-Fall Creek 2 
1950 12,300 
Lancaster, Cayuga Creek, N.Y. 1 1954 797,300 
Marsh Creek, Geneva, N.Y.1,6 - 226,429 
Montour Falls, Oswego River Basin, N.Y. 1 1954 1,681,785 
Onondaga Creek, Nedrow, N.Y.1 ,6 1964 330,231 
Owasco Inlet and Outlet, Montville and Dry 
Creek, State Ditch and Crane Brook, 
N.Y.5 
1950 281,559 
Syracuse, Oswego River Basin, N.Y.1 1954 3,349,248 
Warsaw, N.Y., Oatka Creek ,
' 1969 558,317 - 
Watkins Glen, Oswego River Basin, N.Y.4 1958 43,182 
1. Completed. 
2. To be restudied. 
3. Local interests required to contribute $25,000. 
4. Project not considered economically justified and is 
inactive. 
5. Inactive portion of work for State ditch has been done by 
local interests and work on Crane Brook has been deferred at the 
request of local interests. 
6. Project authorized by Chief of Engineers. 
977

TABLE 31-F 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COMPLETED FLOOD PLAIN INFORMATION REPORTS 
Date Federal 
Location Requesting Agency Completed Cost 
Black Creek, N.Y. New York State Conservation Dept. Sept 1969 $28,000 
Division of Water Resources 
Black River, Elyria to mouth, Ohio Ohio Department of Natural Resources June 1964 12,640 
Buffalo Creek, N.Y. New York State Water Resources Commission May 1966 12,000 
Canandaigua Lake, N.Y. Wa-Ont-Ya Regional Water Resources Planning May 1967 3,500 
and Development Board 
Canandaigua Outlet, N.Y. Wa-Ont-Ya Regional Water Resources Planning March 1969 23,768 
and Development Board 
Cattaraugus Creek, N.Y. Reach I Erie-Niagara Basin Regional Water Resources Feb 1968 19,400 
Planning and Development Board 
Cattaraugus Creek, N.Y. Reach II Erie-Niagara Basin Regional Water Resources July 1968 24,257 
Planning and Development Board 
Cayuga Creek, N.Y. Dept. of Public Works Erie County, N.Y. May 1967 9,500 
Cayuga Lake, N.Y. Cayuga Lake Regional Water Resources Planning June 1967 1,300 
and Development Board 
Cazenovia Creek, N.Y. Dept. of Public Works Erie County, N.Y. Nov 1966 9,494 
Chagrin River, Ohio Ohio Department of Natural Resources July 1968 21,431 
Cuyahoga River, Ohio Reach I Ohio Department of Natural Resources July 1968 20,200 
Cuyahoga River, Ohio Reach II Ohio Department of Natural Resources Sept 1969 21,963 
Ellicott Creek, N.Y. Dept. of Public Works Erie County, N.Y. Jan 1968 19,500 
Rocky River, Ohio Reach I Ohio Department of Natural Resources July 1968 15,500 
Sandusky River, Tiffin to mouth, Ohio Ohio Department of Natural Resources June 1964 14,199 
Scajaquada Creek, N.Y. Erie-Niagara Basin Regional Water Resources May 1969 20,142 
Planning and Development Board 
Seneca Lake, N.Y. Wa-Ont-Ya and Cayuga Lake Regional Water June 1967 1,400 
Resources Planning and Development Board 
Smokes Creek, N.Y. New York State Water Resources Commission March 1965 7,214 
Tonawanda Creek, N.Y. Dept. of Public Works Erie County, N.Y. Aug 1967 12,000 
Vermilion River, Ohio Ohio Department of Natural Resources June 1965 11,958 
978

U.S. LAKE SURVEY* 
This district embraces the U. S. portion of the Great 
Lakes-St. Lawrence River drainage basin, Lake 
Champlain, lakes and other naturally navigable waters 
of New York State Barge Canal system, and the 
Minnesota-Ontario border lakes. In addition, contiguous 
Canadian areas are included where essential to 
integrity of charting and other activities. 
IMPROVEMENTS 
Navigation Page 
1. Survey of North Central lakes. ............ 1.979 2. 
General Investigations Page 
Examinations and surveys. ................... 983 
NAVIGATION 
1. SURVEY OF NORTH CENTRAL 
LAKES 
Location. Region in which operations'are conducted 
lies within States of Vermont, New York, Pennsylvania, 
Ohio, Michigan, Indiana, Illinois, Wisconsin, 
and Minnesota. For additional details see Annual 
Report for 1962. 
Previous projects. In the region described, previous 
projects of Lake Survey have specified provision of 
complete navigation charts designed to suit needs of 
existing use of waters. These projects, in addition to 
hydrographic and topographic surveys, contemplated 
establishment of requisite horizontal and vertical 
control where not already in existence, and measurement 
and analysis of other factors pertaining to 
navigation. A comprehensive statement concerning 
prior projects on the Great Lakes, and formulation of 
"a general project covering to completion the operations 
of the Survey" appeared in Annual Report for 
1907, pages 844 to 850. Responsibilities under prior 
projects in Great Lakes portion of the region covered, 
apart from charting and navigational aspects, consisted 
of those pertaining to lake levels, hydrology, and 
hydraulics of connecting and outflow rivers. The 1907 
Annual Report, referred to above in connection with 
charting and navigational portions of the project, also 
discussed prior and existing responsibilities in these 
respects. A board appointed by the Division Engineer, 
Great Lakes Division, to study and clarify U. S. Lake 
Survey activities in this second category formulated a 
report which included definite recommendations. The 
board report was presented to the Chief of Engineers 
and approved January 21, 1935, as basic description of 
such responsibilities. 
Existing project. Portion of existing project concerned 
with charting provides for general maintenance of 
chart coverage. Various classes of charts are issued 
consisting essentially of general charts employing small 
scales; coastal, river, and sectional charts employing 
medium scales; harbor and confined locality charts 
employing large scales; and special charts such as those 
for recreational use employing scales suitable for 
purposes intended. Number of charts and individual 
chart scales and coverages are not fixed, project being 
made purposely flexible to permit alterations to keep 
abreast of changing needs. Essential to charting, and 
pertinent to lake levels and hydraulics as well, is the 
portion of project relating to maintenance of horizontal 
and vertical control coverage. Original control was 
established under early projects in connection with 
initial surveys by U. S. Lake Survey on the Great Lakes 
and by other Government agencies in other areas of the 
district. Original control has been preserved wherever 
possible; where destroyed, it has been replaced as 
needed; and where necessary, it has been augmented 
by additional control for use in connection with later 
surveys and other Corps work. 
Project includes publications with information for 
benefit of navigation in addition to that provided by 
charts. These consist of such publications as the Great 
Lakes Pilot and supplements thereto and various lake 
and river level bulletins. The Pilot, issued annually, 
supplies full descriptions of physical conditions of 
waters charted and particulars of constantly changing 
conditions not adapted to adequate or prompt representation 
on charts. The supplements, issued monthly 
during the Great Lakes navigation season, provide 
corrections and additions to the Pilot. Lake and river 
level bulletins permit maximum utilization of navigational 
depths in Federal projects and elsewhere. 
Since 1859, lake level gages installed and operated 
by U. S. Lake Survey have provided a continuous 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
979

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
record of water levels of the Great Lakes and their 
connecting rivers. Present project provides for continued 
operation of a comprehensive gage network. 
In the fields of applied hydraulics and hydrology, 
present project provides for continuing studies of all 
aspects thereof required for discharge of Corps of 
Engineers responsibilities on the Great Lakes. In 
addition to the foregoing, the Lake Survey Great Lakes 
Research Center makes scientific investigations of all 
aspects of fresh-water oceanography relating to development 
and utilization of water resources of the 
Great Lakes system, in conjunction with which field 
surveys and observations are accomplished, data 
collected and analyzed and reports published. For 
additional details of existing project, see Annual 
Report for 1962. 
Operations and Results during Fiscal Year. The following 
paragraph contains a narrative summary of Lake 
Survey activities on the Great Lakes in the fields of 
hydraulics and hydrology, hydrographic surveys, chart 
printing, research and related phases of this District's 
mission. 
ENGINEERING. 
Hydraulics and Hydrology. The computation required 
to reduce the following discharge measurement have 
been completed and reports thereon started: 1967 
Discharge Measurements, Tonawanda Section, Niagara 
River; 1968 Discharge Measurements, Bay Point 
Section, St. Clair River; 1968 Discharge Measurements, 
Roberts Landing Section and Flow Distribution 
in St. Clair River; 1969 Discharge Measurements, 
and Flow Distribution, St. Marys River 
below rapids; 1968 Discharge Measurements, Fort 
Wayne Section, Detroit River; 1969 Discharge Measurements, 
Control Structure, St. Marys River. Adaptation 
of Van Karman's equation for obtaining the 
vertical velocity distribution along with the transverse 
velocity coefficient, determination was incorporated in 
a computer program for reducing velocity measurements 
into discharge. During January 1970, discharge 
measurements were made in the Chicago 
Sanitary and Ship Canal at the request of the 
Metropolitan Sanitary District of Chicago. The measurements 
are now being reduced and will be used to 
check the accuracy of the Sanitary District's Leading 
Edge Sonic meter used for continuously meaSring the 
discharge. Simultaneous measurements of discharge in 
the North Cornwall channel by the Water Survey of 
Canada and the total river flow at Massena Point 
below the power houses by the Lake Survey were 
completed during May 1970. These measurements 
requested by the Seaway Authority will serve to 
evaluate the distribution of flow in the North Channel. 
A Miscellaneous Paper 70-1, "Color-Velocity Method 
in Measuring Discharge," was published. This report 
discussed the application of fluorescent dyes in measuring 
discharge. (Note that the foregoing operations do 
not include certain operations conducted specifically 
for international boards and committee. These operations 
are described later in a separate section herein. 
Note, however, that some of the foregoing operations 
are pertinent to the work of the international groups as 
well as to the basic Lake Survey mission.) 
Hydrographic Surveys. Hydrographic surveys were 
begun on the St. Clair River. These surveys are 
required for updating of charts of this area and for 
measurements of specific cross section of the main river 
and the North, Middle and South Channels in support 
of a hydraulic study of the river. Horizontal control was 
established where needed in this area and near Toledo, 
Monroe and Port Dolomite. Revisory surveys were 
completed on Lakes Huron and Superior, Lake of the 
Woods and Rainy Lake, and along the St. Marys 
River. Revisory surveys were started on Lake Erie. 
Surveys required for the maintenance of vertical 
control at harbors and gage sites along these waters 
were accomplished. Sixty-six special water-level gages, 
established earlier in selected harbors on Lakes 
Superior, Huron, and Michigan were continued in 
operation through September 1969. These gages are 
required to obtain data for verifying or establishing 
vertical control at these harbors. Fifty-one similar 
gages were installed at harbors on Lakes Michigan, 
Huron, Erie, and Ontario in May 1970. Field work for 
the re-evaluation of International Great Lakes Datum 
(1955) was continued with levels of special accuracy 
along portions of the St. Lawrence, Detroit and St. 
Marys Rivers. 
Chart Printing. Forty-eight Lake Survey charts were 
printed; consisting of 28 new editions, 16 reprints, and 
4 recreational series charts of which 3 were reprints, for 
a total of 139,503 copies. In addition, 81,875 copies of 
the Lake Survey Monthly Bulletin of Lake Levels were 
printed, together with 46,000 copies of Lake Survey's 
chart catalog. Work for other Districts consisted of 35 
Status Maps, 205 Project Maps, 43 Flood Plain Maps, 
24 miscellaneous maps, and 77 Illinois Waterway 
charts, 11 flood reports and brochures for a total of 1, 
045,928 copies. 
GREAT LAKES RESEARCH CENTER. 
Water Motion. Work accomplished in the various 
continuing projects of this field included studies and a 
report on harbor currents at Toledo, Ohio and Harbor 
Beach, Michigan; deep-water wave measurements at 
Eagle Harbor, Whitefish Point, Point Betsie, and 
Grand Haven, Michigan and Lorain, Ohio, and 
shallow water wave characteristics measurements at 
Pentwater, Michigan. A report on harbor and nearshore 
currents has been prepared. Energy transfer at 
the air-water interface is being studied using data from 
the research tower near Muskegon, Michigan. 
Shore Processes. Work was completed and a paper 
published on the littoral transport and energy relationships, 
using the data recorded and measured in 
lower Lake Huron and St. Clair River. In support of 
the planned extensive subbottom investigations in 
980

U. S. LAKE SURVEY 
Lake Erie, a map summarizing the current knowledge 
of the lake's bottom sediment distribution is being 
prepared. 
Water Characteristics. For determination of water 
characteristics in Lake Superior, 11 cruises were 
conducted in the western portion of Lake Superior 
between 8 May and 7 November 1969. Data were 
reduced on Lakes Erie, Huron and the eastern portion 
of Lake Superior water and bottom characteristics. A 
data report for Lake Erie was largely completed. 
Water Quantity. Studies were completed on methods 
for determining overwater precipitation from the 
overland records on Lake Michigan. Reduction of 
climatological data from Lakes Michigan and Erie 
continued. Preparation of comprehensive texts on the 
limnology and hydrometeorology of the Great Lakes 
was initiated in response to a request from the Great 
Lakes Basin Commission. A mathematical modelingsystems 
analysis program for Great Lakes water 
resource planning was also initiated. 
Ice & Snow. The extent and characteristics of ice 
cover on the Great Lakes were recorded by visual 
observations and photomappings in ice charting, 8 
aerial reconnaissance flights were made which resulted 
in 23 ice charts, and in aerial photomapping, 2,500 
miles at an altitude of 23,000 feet were flown. Aerial 
photomapping flights of the lakes and Whitefish Bay 
and the St. Marys River were flown by the U. S. Air 
Force. Reports titled "A Literature Review of Dusting 
Techniques" and "Great Lakes Ice Atlas" were 
published. 
International Hydrological Decade. In addition to its 
continuing Great Lakes research mission, the Lake 
Survey was designated by the Chief of Engineers to 
administer the Corps of Engineers responsibility as 
Lead Agency for the International Hydrological 
Decade activities on the Great Lakes. These activities 
have been designated "International Field Year on the 
Great Lakes" (IFYGL). In coordination with the 
Steering Committee, four research contracts with 
universities were negotiated, and one project within the 
U. S. Geological Survey was funded. Instrumentation 
contract has been signed and work is in progress 
GREAT LAKES REGIONAL DATA CENTER 
Computer utilization was increased for reduction of 
data generated by Engineering and Research activities. 
Computer applications included statistical 
analyses of data on spoils disposal, water levels, water 
temperatures, ice and snow, and hydraulics and lake 
regulation. An accounting machine was installed for 
listing of punched cards for sight verification and 
editing to reduce processing costs of erroneous data. 
International Activities. In addition to the International 
Activities reported above under Operations and 
Results during Fiscal Year, the following operations 
were conducted specifically for international boards 
and committees. 
International Joint Commission. The District Engineer 
and members of his staff attended the October 1969 
and April 1970 appearances of the Great Lakes Boards 
before the International Joint Commission. 
International Lake Superior Board of Control. Periodic 
reports of water levels and recommendations regarding 
regulation of Lake Superior were furnished to the 
Board. The computation of the effects of Lake Superior 
regulation on the lower lakes is being kept current for 
the Board's use and information. 
International Niagara Board of Control and International 
Niagara Commission. The District Engineer and members 
of his staff attended two meetings of the Board. 
Studies of the effects of changes in the Niagara River 
and filling to the 6-foot contour were made. 
International St. Lawrence River Board of Control. The 
District Engineer and members of his staff attended 
three meetings of the Board. 
Regulation Representatives. Each Thursday the outflow 
to be released from Lake Ontario was coordinated for 
the ensuing week with the Canadian Regulation 
Representative, and the Power Authority of the State 
of New York was informed of the quantity. Regulation 
Plan 1958-D, which was developed as a cooperative 
project by the Canadian and U. S. Regulation 
Representatives, was used for the determination of the 
outflow. Collaboration with Canada in the collection of 
Lake Ontario and St. Lawrence River data needed for 
regulation was continued. The District Engineer or a 
member of his staff attended two meetings of the 
Board's Operations Advisory Group. Supply forecasts 
and reports for the Board's information concerning the 
effects of certain probable supply sequences on the 
levels of Lake Ontario were made monthly. Operation 
of Iroquois Dam was requested and authorized on two 
occasions during the fiscal year. 
St. Lawrence Committee on River Gaging. Field inspection 
of the St. Lawrence River water-level gages used by the 
St. Lawrence River Board of Control was made jointly 
with the Hydro-Electric Power Commission of Ontario, 
and monthly random checks were made of the 
power entities water-level record reductions. Field 
inspection was made in conjunction with the Inland 
Waters Branch, Department of Energy, Mines and 
Resources, Canada, of the procedures for determination 
of flow through the structures of Lake St. 
Lawrence and random check of the flow through the 
several structures was made for one day each month. 
The 30th and 31st progress reports of the committee 
were prepared and presented to the Board of Control. 
St. Lawrence River Board of Control Working Committee. 
The District Engineer or a member of his staff attended 
three meetings of the Working Committee. The 
Working Committee studied and completed a report 
on Lake St. Lawrence low water levels. 
Great Lakes Levels Board and Working Committee. The 
District Engineer or members of his staff attended two 
981

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
meetings of the Board and three meetings of the 
Working Committee. The District Engineer and/or 
members of his staff attended ten meetings of the 
Regulation Subcommittee during the year. In addition, 
close liaison between personnel engaged in the 
studies for the Working Committee and the Board was 
maintained through frequent telephone discussions 
and exchanges of study material. The Regulation 
Subcommittee during the reporting period forwarded 
to the Working Committee letter reports on the 
completion of its optiminization and basic of comparison 
studies. The Subcommittee developed for the 
Board a CPM for the Great Lakes Levels Study. 
Currently under study are regulation plans for all of 
the lakes and for the Superior-Ontario combination. In 
conjunction with these studies, work continued on 
preparation of a report on the hydraulics and hydrology 
of the system. A report on consumptive use of 
water within the system, and a report on simulation of 
Great Lakes Basin water supplies and winter flow 
retardations was completed. A member of the staff 
attended nine meetings of the Regulatory Work 
Subcommittee. 
Regulatory Works Activities FY1970. The subcommittee 
completed a report on the 1968-69 winter gate tests at 
the St. Marys Control Structure, conducted similar 
tests during the winter 1969-70 and began preparing a 
report thereon. The Niagara Mathematical Model was 
documented and given to the Canadian Section on the 
Subcommittee for channel design studies on the 
Niagara River. A report on the Preliminary Foundation 
Investigation, Niagara River at Fort Erie for an 
alternate sit e location for a proposed control structure 
was completed by the Canadian section. The St. Clair 
Mathematical Model was completed, joined with the 
previously completed Detroit River model and operated 
for the development of preliminary channel 
designs. Discharge measurements and water levels were 
obtained for the basic data required for the St. Marys 
River Mathematical Model. Work on the computer 
program for this model and Hydrographic surveys for 
updating the cross sectional areas of portions of the St. 
Clair River were started. During the year, support was 
provided to the Shore Property Subcommittee through 
evaluation of regulation plans. The District Engineer 
and members of his staff attended three meetings of the 
Reports Subcommittee. The Subcommittee developed 
and issued a style and format manual for the Board's 
final report. 
Coordinating Committee on Great Lakes Basic Hydraulic 
Data and Subcommittee. The Chief of the Engineering 
Division and members of the staff attended two 
meetings of the Committee with its Subcommittees 
during the year. Work of the Subcommittees was as 
described below. Lake levels--Vertical Control Subcommittee: 
Compilation of reports titled, "History of 
Water Level Gages, Lake Erie and Niagara River," 
and "History of Water Level Gages-Lake 
Michigan--Huron and St. Clair-Detroit River," 
continued. Gravity measurements along a level line 
between Cornwall Island, Ontario, and Sturgeon 
Point, N. Y. was completed. The study of crustal 
movement in the Great Lakes are continued. 
River Flow Subcommittee. The Lake Supreior outflow 
report was prepared for and approved by the Committee. 
This report, the product of a cooperative effort 
with the Inland Waters Branch of Canada, is now 
being prepared for publication. The results of the 1969 
discharge measurements at the St. Marys River 
Control structure were incorporated into a hydraulic 
report on the "Verification of St. Marys Rapids 
Rating," and submitted to the Canadian Section of the 
Subcommittee for review prior to submission to the 
Coordinating Committee and the Lake Superior Board 
of Control. 
Physical Data Subcommittee. The Subcommittee completed 
work on determination of all surface water and 
land areas for the Great Lakes. Work is continuing on 
the determination of water volumes, currently working 
on volumes for Lakes Huron and Superior. 
Great Lakes Study Group. The District Engineer 
attended two meetings of the group during the year. 
Regional Data Center Branch of the Great Lakes Study 
Group. Directory and Project Forecasts for 1969 was 
published and in excess of 300 copies were disseminated; 
also, numerous data requests from members 
were answered. 
CHART SALES AND RELATED ACTIVITIES 
122,891 charts were sold to the public, and 16,327 
charts were issued for official use. Total receipts 
amounted to $154,117.00. In addition, 1,067 training 
charts were sold amounting to $267.00. The 1970 
edition of the Great Lakes Pilot was prepared. 728 copies 
of the 1969 Pilot and Supplements were sold and 57 
copies issued for official use. 3,609 copies of the 1970 
Pilot and Supplements were sold and 466 copies issued 
for official use with total receipts amounting to $11, 
583.00. 163 copies of the Waterborne Commerce 
Statistics, Parts III and IV, and Supplements to Part V 
were sold and 42 copies issued for official use. Total 
receipts amounted to $125.00. In addition to the above 
publications, monthly and semi-monthly lake-level 
bulletins and tabulations of other Great Lakes hydraulic 
and hydrologic data were sent to these 
individuals, newspapers, shipping and industrial interests, 
Congressmen, and Government agencies in 
both the United States and Canada to whom the 
information is of concern. The Monthly Bulletin of 
Lake Levels was sent regularly to over 4,000 official 
and private recipients. Tabulations of river discharges, 
precipitation, diversions, water levels at specific locations, 
and other data were also dispatched regularly 
to 300, primarily official, recipients. 
FINANCIAL SUMMARY 
Total cost for the year was $2,255,557 including $88, 
871.00 for Pilot Program - disposal of dredge spoil in 
982

U. S. LAKE SURVEY 
the Great Lakes. Reimbursable printing work was $60, 
693.00 for reproducing project and other special maps 
for Corps Districts. Cost of reproduction, correction 
and distribution of navigation charts, printing and 
distribution of the Great Lakes Pilot and preparation, 
printing and distribution of the Pilot Supplements 
amounted to $173,430.00 and was charged against the 
revolving fund, these costs to be realized through the 
sale of charts and related publications to the public and 
other government agencies. Other reimbursable work 
done by Lake Survey for District offices cost $47,415.00 
during the fiscal year. 
Condition at End of Fiscal Year. All new work under 
various projects is complete. New work under existing 
project cost $2,755,914.00, and maintenance thereunder 
to June 30, 1970, cost $25,941,272.00, for a total 
of $28,697,186.00. At the end of the fiscal year, Lake 
Survey publications available for issue to official users 
and for sale to the general public consisted of: 143 
charts of the Great Lakes and certain connecting 
waters; the 1970 Great Lakes Pilot and Supplements; a 
hydrograph of mean monthly lake levels; a monthly 
Bulletin of Lake Levels which shows current elevations, 
comparisons with past levels and forecasts of future 
levels; and a semi-monthly bulletin forecasting water 
levels and available depths in the Great Lakes 
connecting channels. Tabulations of river discharges, 
precipitation, diversions, water levels at specific locations 
on the lakes, and other hydraulic and hydrologic 
data are also available. Other tabulations and 
compilations of data in charting and geodetic fields are 
posted currently for use in answering the large number 
of inquiries regarding such data each year. In addition, 
a number of research and engineering reports covering 
a variety of technical and oceanographic subjects are 
available. 
2. EXAMINATIONS AND SURVEYS 
Fiscal year cost was $46,600 for collection and study 
of basic data in connection with international water 
studies and $72,000.00 in connection with survey 
reports on Great Lakes water levels. Costs amounted to 
$58,950.00 for work in connection with Great Lakes 
Region - Comprehensive Basin Study. Costs were 
$763.00 for work in connection with Mississippi River 
year-round navigation study covering the States of 
Illinois, Iowa, Minnesota, Missouri and Wisconsin. 
Costs were $20,000.00 for International Hydrological 
Decade. 
983

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 32-A COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
1. Survey of North New Work 
Central Lakes Approp. $ - $ - $ - $ - $ 6,729,8111 
Cost - - - - 6,729,811 
Maint. 
Approp. 1,935,000 2,661,700 2,530,000 2,324,041 26,179,231 
Cost 1,765,942 2,222,626 3,029,661 2,255,557 25,941,272 
Rehab. 
Approp. - - - - 
Cost - - - - 
1. Includes $3,973,897 for New Work for previous project. 
984

LOS ANGELES, CALIF., DISTRICT * 
This district (total area, about 240,000 square miles) 
comprises those drainage basins tributary to the Pacific 
Ocean that are in California between the Mexican 
boundary and Cape San Martin (about 265 miles 
north of entrance to Los Angeles Harbor); lower 
Colorado River drainage basin (below Lee Ferry, 
Ariz.), which is in southeastern California, southeastern 
Nevada, southwestern Utah, western New 
Mexico, and all of Arizona, except the northeastern 
corner; that part of the Great Basin that is in southern 
Nevada and southeastern California; and the United 
States parts of those small drainage basins in southern 
Arizona and southwestern New Mexico west of the 
Continental Divide that drain southward into Mexico. 
IMPROVEMENTS 
Navigation Page 
1. Channel Islands Harbor, Calif. .............. 986 
2. Dana Point Harbor, Calif. .................. 986 
3. Marina del Rey, Los Angeles County, 
Calif ....................... .................. 987 
4. Morro Bay Harbor, Calif. ................... 988 
5. Oceanside Harbor, Calif. ..................... 988 
6. Port Hueneme, Calif. ............................. 989 
7. Port San Luis, Calif. ............................ 989 
8. San Diego Harbor, Calif. .................... 990 
9. San Diego River and Mission Bay, 
Calif. ....................................... 991 
10. Santa Barbara Harbor, Calif ................ 992 
11. Ventura Marina, California ................ 992 
12. Reconnaissance and condition surveys .. 993 
13. Other authorized navigation projects .... 993 
14. Coast of California, Point Mugu to 
San Pedro breakwater, California ..... 993 
15. San Diego (Sunset Cliffs), Calif........... 994 
16. San Gabriel River to Newport Bay 
(Surfsi.'e-Sunset and Newport Beach), 
Orange County, Calif. ...................... 994 
17. Inspection of completed beach erosion 
control projects ................................... 995 
18. Other authorized beach erosion control 
projects ........................................ 995 
19. Beach erosion control work under 
special authorization .......................... 995 
Flood Control 
20. Alamo Reservoir, Bill Williams River, 
A riz. ............................. .................... 995 
21. Gila River Basin, Ariz.: ....................... 996 
21A. Indian Bend W ash ................................... 996 
21B. Lower Gila River levee and channel 
improvements (Gila River and 
tributaries downstream from Painted 
Rock Reservoir) ................................. 996 
Flood Control (cont.) Page 
21C. Middle Gila River channel 
improvements, upper end of Safford 
Valley to Buttes Reservoir site 
(Camelsback Reservoir site to Salt 
River) ....................................... 996 
21D. Painted Rock Reservoir (Gila River) ... 997 
21E. Phoenix, Ariz., and vicinity (including 
New River) ................................... 997 
21F. Santa Rosa Wash (Tat Momolikot 
Dam and St. Clair Reservoir) ........ 997 
21G. Whitlow Ranch Reservoir, Queen 
Creek ........................... ....... 998 
22. Los Angeles County drainage area, 
California ........................................ 998 
23. Lytle and Warm Creeks, Santa Ana 
River Basin, Calif. ............................. 1000 
24. Mojave River Basin, Calif.: ................... 1000 
24A. Mojave River Reservoir ....................... 1000 
24B. Oro Grande Wash channel 
improvements .................................... 1001 
25. Needles, San Bernardino County, Calif. 1001 
26. Pine and Mathews Canyons Reservoirs, 
Colorado River Basin, Nev. ............. 1001 
27. Rose Creek channel improvements, San 
Diego, Calif. ..................................... 1002 
28. San Diego River (Mission Valley), San 
Diego River Basin, Calif. .................... 1002 
29. Santa Ana River Basin (and Orange 
County), Calif. ...................................... 1002 
30. Santa Paula Creek channel 
improvement, Santa Clara River 
Basin, Calif ...................... ................. 1003 
31. Sweetwater River, Sweetwater River 
Basin, Calif. ........................................ 1003 
32. Tijuana River Basin, Calif ............ 1003 
33. Whitewater River Basin, Calif. ........... 1004 
33A. Chino Canyon improvements, Palm 
Springs ..................................... 1004 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
985

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Flood Control (cont.) Page 
33B. Tahquitz Creek ...................................... 1004 
34. Winslow (tributaries of Little Colorado 
River), Little Colorado River Basin, 
Ariz. .............. .................. ....... 1004 
35. Inspection of completed flood control 
projects ........................................ 1005 
36. Scheduling flood control reservoir 
operations ....................................... 1005 
37. 
38. 
39. 
40. 
41. 
Flood Control (cont.) 
Other authorized flood control projects 
Flood control work under special 
authorization ....................................... 
General Investigations 
Page 
1005 
1005 
Surveys ........................................ 1005 
Collection and study of basic data ....... 1005 
Research and development .................. 1005 
NAVIGATION 
1. CHANNEL ISLANDS HARBOR, CALIF. 
Location. On California coast, 65 miles northwest of 
Los Angeles Harbor and 345 miles south of San 
Francisco. (See Coast and Geodetic Survey Charts 
5007 and 5202.) 
Existing project. A harbor for light-draft vessels, on 
coast of southern California about a mile northwest of 
existing harbor of Port Hueneme, and beach erosion 
control works. Ventura County, sponsor of project, 
requested modification of document plan of harbor 
improvement and submitted a modified plan that was 
approved and adopted by Chief of Engineers in 1957. 
The harbor, which provides facilities for berthing and 
servicing about 640 small craft and commercial fishing 
boats, includes an entrance channel 20 fee deep, 300 
feet wide, and 1,650 feet long-protected by two 
parallel entrance jetties 1,270 and 1,300 feet long; an 
entrance basin 20 feet deep, 300 to 750 feet wide, and 1, 
750 feet long; an inner basin 10 feet deep, 900 to 1,400 
feet wide, and 1,200 to 2,000 feet long; and a side basin 
10 feet deep, 100 to 250 feet wide, and 900 feet long. 
About 6,238,000 cubic yards of dredged material from 
entrance channel, interior basins, and sandtrap were 
deposited in feeder-beach area to restore downcoast 
shoreline. A 2,300-foot-long offshore breakwater was 
placed to form a sandtrap in conjunction with jetties. 
About 2,000,000 cubic yards of material are to be 
dredged each biennium from sandtrap formed by 
jetties and breakwater. This material will also be 
deposited along the downcoast shoreline as long as the 
area remains under Federal ownership and requires 
beach erosion control. Plane of reference is mean lower 
low water. Range between mean lower low water and 
mean higher high water is 5.4 feet. Extreme range is 
about 8.5 feet. Federal first cost of new work on project 
as modified was $5,123,345 (excluding $1,361,668 
Navy funds and cost to Coast Guard for installation of 
aids to navigation). Existing project was adopted by 
1954 River and Harbor Act (H. Doc. 362, 83d Cong., 
2d sess.). Map of modified plan is in "Design 
Memorandum No. 1, General Design for Harbor and 
Shore Protection Works Near Port Hueneme, California," 
prepared by Los Angeles District in May. 
1957. 
Local cooperation. Fully complied with. 
Terminal facilities. A 4-lane launch ramp and 2 public 
docks for outboard motorboats; paved parking for 125 
car trailers; dry storage for 200 boats on land, 800 boats 
in slips in 3 marinas, with restroom and shower 
facilities; 3-ton hoist; boat-repair facilities, with a 35- 
ton hoist (yard and boatways for boats up to 100 tons, 
including facilities for repairing and manufacturing 
boats up to 75 feet long); fueling facility; sport-fishing 
facilities; and 3 restaurants. There are 240 marina 
apartments, with 200 adjoining slips, 90 motel units, 2 
yacht club buildings, and a harbor administration 
building. A yacht club, with 90 apartments and 50 boat 
slips, is scheduled for completion by the end of 1970. A 
private marina development, immediately north of 
Channel Islands Harbor, plans to construct 350 
waterfront homes, with docking facilities, during the 
next 12 months. Included will be a 4-lane bridge, with a 
span about 34 feet above sea level, for boats traversing 
the harbor to the marina development. 
Operations and results during fiscal year. Current biennial 
dredging was completed at a cost of $946,812 regular 
funds and $230,280 Navy funds. In addition, a 
reconnaissance and condition survey was conducted at 
a cost of $1,050. 
Condition at end of fiscal year. Construction was started 
in February 1959. Construction of north and south 
jetties was completed in June and September 1959, 
respectively. Construction of detached breakwater was 
completed in October 1960. Original harbor dredging 
was completed in August 1961. Current biennial 
dredging was completed in January 1970. Contract for 
maintenance dredging was awarded late in June. 
2. DANA POINT HARBOR, CALIF. 
Location. On Pacific coast in southern part of Orange 
County, about 40 miles southeast of Los Angeles and 
Long Beach Harbors, 60 miles northwest of San Diego 
Harbor, and 17 miles southeast of Newport Beach 
Harbor. (See Coast and Geodetic Survey Chart 5101.) 
Existing project. Plan as modified provides for establishm 
ent of a harbor at Dana Point to accommodate 
2,150 small craft and to serve as a harbor of 
refuge for light-draft vessels; an entrance channel 600 
feet wide, 1,600 feet long, and 15 to 20 feet deep; a 
main channel 350 feet wide, 3,300 feet long, and 15 feet 
deep; an east channel 250 feet wide, about 1,100 feet 
long, and 12 to 15 feet deep; an anchorage area 350 feet 
wide, about 600 feet long, and 12 to 15 feet deep; a west 
channel and turning basin 450 feet wide, 900 feet long, 
and 10 feet deep; a west breakwater 5,500 feet long; 
and an east breakwater 2,250 feet long. Plane of 
reference is mean lower low water. Range of tide 
986

LOS ANGELES, CALIF., DISTRICT 
between mean lower low water and mean higher high 
water is 5.3 feet. Extreme range is about 10.7 feet. 
Latest approved estimated (1967) first cost for project is 
$9,200,000, comprising $4,604,000 Federal (including 
$24,000 for Coast Guard costs) and $4,596,000 non- 
Federal. Existing project was adopted by 1962 River 
and Harbor Act (H. Doc. 532, 87th Cong., 2d sess.). 
Authorized project was modified by Design Memorandum 
No. 1, approved in February 1966, which 
contains a map of modified project plan. 
Local cooperation. Local interests must contribute in 
cash 50 percent of the first cost of construction of 
general navigation facilities; provide lands and rightsof-
way for construction and future maintenance of the 
project and of aids to navigation upon request of Chief 
of Engineers, including suitable spoil-disposal areas 
and necessary retaining dikes, bulkheads, and embankments 
therefor or cost of such retaining works; 
hold the United States free from damages; provide and 
maintain adequate service frontage and public landing 
with suitable supply facilities, necessary mooring 
facilities and utilities, and access roads, parking areas, 
and other necessary public-use shore facilities, open to 
all on equal terms; first phase of development to be 
completed within 5 years, and full development within 
15 years, after completion of general navigation 
facilities; operate a general anchorage area or mooring 
facilities with reserved spaces adequate for transient 
boat traffic and for refuge, open to all on equal terms; 
dredge berthing areas commensurate with depths of 
Federal channel improvements; and secure and hold in 
the public interest all lands bordering development to a 
width sufficient for proper functioning of harbor. 
Terminal facilities. Since 1956, Orange County Harbor 
District constructed the following improvements at 
Dana Point: A paved access road from top of bluff to 
cove; about 2 acres of filled land protected from wave 
action by stone revetment; a 300-foot-long concrete 
pile-trestle pier; public restroom and parking facilities; 
a concrete launching ramp for trailered boats; 14,000 
linear feet of quay wall; and 5,500 linear feet of rockrevetted 
slope; created 102 acres of level land support 
area; and deepened 78 acres of water area for boat 
basins. The Orange County Harbor District is in the 
process of extending water, sewer, electric power, gas, 
and cable TV service to all land areas. 
Operations and results during fiscal year. Administered 
right-of-way acquisition continued by local interests. In 
addition, a reconnaissance and condition survey was 
conducted at a cost of $825. 
Condition at end of fiscal year. Breakwater construction 
was completed in October 1968. Work remaining 
consists of dredging of general navigation channels and 
completing administration of right-of-way acquisition 
by local interests, as required. 
3. MARINA DEL REY, LOS ANGELES 
COUNTY, CALIF. 
Location. On coast of southern California, Santa 
Monica Bay in Los Angeles County, 20 miles northwest 
of Los Angeles Harbor and 390 miles southeast of San 
Francisco Bay. (See Coast and Geodetic Survey Charts 
5101 and 5144.) 
Existing project. A harbor for light-draft vessels at 
Marina del Rey. The harbor as modified, which 
provides for protected berthing facilities for about 6, 
500 small craft and facilities for parking 2,500 trailermounted 
craft, includes an entrance channel, with 
north and south side revetments, a main channel, north 
and south entrance jetties, eight side basins, with six 
intervening moles, and an offshore breakwater. Plane 
of reference is mean lower low water. Range of tide 
between mean lower low water and mean higher high 
water is 5.6 feet. Extreme range is about 10.5 feet. First 
cost of new work for completed project was $8,477,504 
($4,238,752 Federal and $4,238,752 non-Federal). 
Project was authorized by 1954 River and Harbor Act 
(H. Doc. 389, 83d Cong., 2d sess.). A map of modified 
plan is in addendum 1 to "Design Memorandum No. 1, 
General Design for Playa Del Rey Inlet and Harbor, 
Venice, Calif.," prepared by Los Angeles District in 
November 1956. This modified plan was further 
modified to conform to the 1959 master plan of local 
interests and to provide an offshore breakwater as an 
additional protective structure for the harbor. For 
further project description, see page 1353 of Annual 
Report for 1966. 
Local cooperation. Fully complied with 
Terminal facilities. About 4,985 boats are presently 
berthed in 17 operating anchorages, which afford 5,182 
berths. An additional anchorage under construction 
will provide 371 additional berths before the end of 
1970. A Coast Guard station with a permanently 
assigned 82-foot cutter, a fire fighting detachment with 
two fire boats and a pumper engine, and a harbor 
patrol with four patrol boats and three auxiliary vessels 
are on 24-hour duty. One fuel dock capable of servicing 
several thousand craft is operational and a second is 
currently under construction. A 10-lane launching 
ramp with parking for 300 cars and trailers, dry storage 
for about 400 trailer-borne boats, and several hoists are 
in operation, as well as 2 haul-out yards, one 
containing a 70-ton marine elevator and railway 
transfer pit. One hotel and 2 motels, 14 restaurants, 
several snack bars, and 3 coffee shops are in operation, 
with 1 additional restaurant under construction. A 
restaurant and a motel, with take-out food complex, 
are in final planning stages. Some 2,224 apartments are 
almost fully occupied; about 1,800 units are under 
construction; and an additional 1,800 units are being 
planned, as well as an 800-room high-rise hotel. 
Harbor will ultimately have slips for about 6,000 boats 
and dry storage for about 2,000 more. 
Operations and results during fiscal year. Initiated and 
completed maintenance dredging at a cost of $220,000 
regular funds. In addition, a reconnaissance and 
condition survey was completed at a cost of $1,747. 
Condition at end of fiscal year. Construction was started 
in February 1958. Construction of jetties, which are in 
good condition, was completed in November 1958; and 
construction of bases for navigation aids was completed 
987

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
in September 1959. Dredging was completed in April 
1962; and revetment, in May 1962. Construction of 
offshore breakwater, together with bases for navigation 
aids, was completed in April 1965. The last maintenance 
dredging was completed in November 1969. 
4. MORRO BAY HARBOR, CALIF. 
Location Morro Bay is on the Pacific coast, 110 miles 
south of Monterey Bay, 120 miles northwest of Santa 
Barbara Harbor, and nearly midway between San 
Francisco and Los Angeles. (See Coast and Geodetic 
Survey Chart 5387.) 
Existing project. Two randomstone entrance breakwaters, 
the upcoast breakwater extending 1,885 feet 
south by west from Morro Rock, and downcoast 
breakwater extending west from sandspit 1,399 feet, 
thence northwest 433 feet, a total distance of 1,832 feet; 
and entrance channel 16 feet deep, 350 feet wide, and 
2,500 feet long; Navy channel 16 feet deep, ranging in 
width from 350 to 800 feet from entrance channel to 
City of Morro Bay, and 4,500 feet long; Morro channel 
from City of Morro Bay to lower bay 12 feet deep, 
generally 150 feet wide, and 5,300 feet long; a stone 
dike extending 1,600 feet from Morro Rock to 
mainland; a quarry-waste revetment levee extending 6, 
930 feet along waterfront at Morro Bay to retain 
marginal fills; and a stone groin 1,000 feet long. A 
rehabilitation plan, to replace project-document plan, 
was approved in August 1961. Deteriorated structures 
and channels were restored to substantially the dim 
ensions existing at completion of original construction, 
except that reconstructed breakwater is 100 feet 
bayward of original alinement and has flatter side 
slopes and heavier armor stone. Breakwater head is a 
trapezoidal prismoid constructed of monolithic concrete. 
Plane of reference is mean lower low water. 
Range between mean lower low water and mean 
higher high water is 5.4 feet. Extreme range is about 8.5 
feet. Federal first cost for new work for completed 
project was $2,612,093 Navy funds. Federal first cost 
for rehabilitation was $2,128,411. Existing project, 
adopted by 1945 River and Harbor Act, includes 
improvements as set forth in House Document 283, 
77th Congress, 1st session, and further harbor development 
as desired by Navy Department in accordance 
with plans on file in Office of the Chief of 
Engineers. A map of rehabilitation plan as approved is 
in "Design Memorandum, General Design for Rehabilitation 
of North Breakwater and Continuing 
Maintenance of Morro Bay Harbor, Near Morro Bay, 
California," prepared by Los Angeles District in 
December 1960 and revised in August 1961. 
Local cooperation. Fully complied with. None required 
under rehabilitation plan. 
Terminal facilities. Facilities, which are adequate for 
existing commerce, comprise 640 feet of existing piers 
constructed by Navy, 550 feet of piers and 150 feet of 
floating docks constructed by San Luis Obispo County, 
263 feet of floating docks constructed by California 
Department of Parks and Recreation, 486 feet of 
floating docks constructed by City of Morro Bay, 1,290 
feet of privately owned piers, and 5,295 feet of privately 
owned floating docks. 
Operations and results during fiscal year. A reconnaissance 
and condition survey was conducted at a cost of $5,430. 
Condition at end of fiscal year. Existing project was 
completed in 1946. Downcoast breakwater and stone 
dike connecting Morro Rock and mainland were 
completed in 1942; retaining levee, marginal fills along 
waterfront, and channel to lower bay, in 1944; the 
upcoast (Morro) breakwater, in 1946; and navigation 
channels were dredged to project dimensions and stone 
groin 800 feet long was constructed in August 1956. 
Rehabilitation work, consisting of reconstruction of 
Morro breakwater, was completed in June 1964. 
Maintenance dredging to restore harbor to authorized 
depths and extension of stone groin by 200 feet were 
completed in October 1964. Additional maintenance 
dredging was completed in November 1968. 
5. OCEANSIDE HARBOR, CALIF. 
Location. On coast of southern California at 
Oceanside, about 30 miles north of City of San 
Diego. (See Coast and Geodetic Survey Chart 5101.) 
Existing project. Maintenance of general navigation 
features of Del Mar Boat Basin constructed by U.S. 
Navy and of Oceanside Harbor constructed by local 
interests. These features include approach channel 
common to Del Mar Boat Basin and to Oceanside 
Harbor 700 feet long, 750 feet wide, and 20 feet deep; 
and entrance channel to Del Mar Boat Basin 3,800 feet 
long and 20 feet deep, with widths 300 to 400 feet. 
Other features, which involve Oceanside Harbor only, 
are (a) entrance channel 2,000 feet long, 250 feet wide, 
and 20 feet deep; (b) irregularly shaped turning basin 
400 feet maximum width, 900 feet long, and 20 feet 
deep; (c) a south harbor channel ranging from 100 to 
150 feet wide, 1,950 feet long, and 15 feet deep; (d) a 
north harbor channel with widths up to 400 feet, 850 
feet long, and 10 feet deep; (e) a south jetty 1,000 feet 
long; (f) a north groin 710 feet long; and (g) 1,200 feet 
of stone revetment adjacent to turning basin and 
entrance channel. Plane of reference is mean lower low 
water. Range of tide between mean lower low water 
and mean higher high water is 5.3 feet. Extreme range 
is about 10.0 feet. The cost of maintenance dredging is 
to be borne equally by the U.S. Navy and the Corps of 
Engineers. Existing project was authorized by 1965 
River and Harbor Act (H. Doc. 76, 89th Cong., 1st 
sess.). 
Local cooperation. Fully complied with for maintenance 
to date. 
Terminal facilities. Storage for about 610 boats (530 
berths plus end-of-dock ties); transient berthing for 
about 50 boats; a fuel dock; a boat hoist; a launching 
ramp, which can accommodate 4 launchings at the 
same time; parking for 1,000 cars; temporary parking 
for about 100 boat trailers; and a boat-repair facility. 
Operations and results during fiscal year. Contract 
adjustment. Administered right-of-way acquisition 
continued by local interests; and initiated and completed 
maintenance dredging at a cost of $150,000 
988

LOS ANGELES, CALIF., DISTRICT 
regular funds and $160,497 Navy funds. In addition, a 
reconnaissance and condition survey was conducted at 
a cost of $3,870. 
Condition at end of Fiscal year. Last maintenance 
dredging was completed in September 1969. The groin 
extension was completed in June 1968 and the jetty 
extension was completed in July 1968. South jetty 
sealing was completed in August 1968. Work remaining 
consists of completing administration of rightof-
way acquisition by local interests, as required. 
6. PORT HUENEME, CALIF. 
Location. On coast of southern California about 65 
miles northwest of Los Angeles and Long Beach 
Harbors, about 1 mile southeast of Channel Islands 
Harbor, immediately west of the City of Port Hueneme, 
4 miles southwest of the City of Oxnard, and 10 
miles southeast of the City of Ventura in Ventura 
County. 
Existing project. Plan provides for adoption and 
maintenance of existing harbor for deep draft vessels at 
Port Hueneme, constructed by local interests and 
subsequently acquired by the U.S. Navy, consisting of a 
west jetty about 800 feet long; an east jetty about 1,000 
feet long; an approach channel about 800 feet long, 600 
feet wide, and 40 feet deep; an entrance channel about 
1,550 feet long, 330 feet wide, and 36 feet deep; a 
central basin 1,080 feet long, 1,025 feet wide, and 32 
feet deep; and a channel (channel A) 1,850 feet long, 
150 feet wide, and 32 feet deep. It further provides that 
the central basin be deepened to 35 feet and that 
channel A be improved by lengthening it to 2,830 feet, 
widening it to 275 feet, and deepening it to 35 feet. 
Plane of reference is mean lower low water. Range 
between mean lower low water and mean higher high 
water is about 5.4 feet. Extreme range is about 10.0 
feet. Approved estimated (1970) first cost for project is 
$1,430,000 ($1,220,000 Federal and $210,000 non- 
Federal). Existing project was adopted by 1968 River 
and Harbor Act (H. Doc. 362, 90th Cong., 2d sess.). 
Local cooperation. Local interests must provide all 
lands, easements, and rights-of-way not already owned 
by the United States required for construction and 
subsequent maintenance of project and for aids to 
navigation upon request of the Chief of Engineers, 
including suitable areas determined by the Chief of 
Engineers to be required in the general public interest 
for initial and subsequent disposal of spoil, and also 
necessary retaining dikes, bulkheads, and embankments 
therefor or costs of such retaining works; 
provide and maintain adequate public terminal and 
transfer facilities, open to all on equal terms, in 
accordance with plans approved by the Chief of 
Engineers; provide and maintain depths in berthing 
areas serving the public terminals commensurate with 
depths provided in related project areas; accomplish 
such alterations as required in sewer, water supply, 
drainage, and other utility facilities; clear and remove 
all improvements and obstructions from the lands, 
easements, and rights-of-way provided for construction 
and subsequent maintenance of project; hold and save 
451-584 0-72-63 
the United States free from damages due to construction 
and maintenance of project, including, but 
not limited to, erosion beyond the rights-of-way 
furnished; and establish regulations prohibiting discharge 
of pollutants into the waters of the harbor by 
users thereof, which regulations shall be in accordance 
with applicable laws or regulations of Federal, State, 
and local authorities responsible for pollution prevention 
and control. 
Terminal facilities. Oxnard Harbor District owns and 
operates terminal facilities known as the Port of 
Hueneme. They include a 1,200-foot-long marginal 
wharf, with over 31 feet at mean lower low water, 
fronting on the south side of slip A. Ancillary facilities 
include extensive paved and unpaved open storage 
areas; three transit sheds, providing 115,000 square feet 
of covered storage area, with ample rail and truck 
loading capability; and an administration building. 
The deep-draft facilities are being expanded to three 
new wharves, with 35 feet at mean lower low water, to 
meet increased commerce and are scheduled for 
completion in 1972. Construction of a 230-foot 
medium-draft concrete wharf with full utilities, including 
fuel, along the entrance channel was completed 
in April 1970. Together with an existing 
contiguous wood wharf, they will provide 300 feet of 
mooring space along the channel entrance. 
Operations and results during fiscal year. The improvement 
of channel A was begun in June 1970 under 
an agreement made pursuant to the provisions of 
section 215 of the 1968 Flood Control Act. Under this 
act, local interests may be reimbursed for work 
performed at projects authorized for construction by 
the Corps of Engineers. In addition, a reconnaissance 
and condition survey was conducted at a cost of $1,825. 
Condition at end offiscalyear. No Federal work has been 
done. 
7. PORT SAN LUIS, CALIF. 
Location. On coast of southern California at San Luis 
Obispo, 190 miles northwest of Los Angeles and 245 
miles southeast of San Francisco. (See Coast and 
Geodetic Survey Chart 5386.) 
Existing project. A rubblemound breakwater with a 
top elevation of 6 feet above mean high water, a top 
width of 20 feet, extending 336 feet from Point San Luis 
to Whaler Island and 1,820 feet southeast from the 
island, a total distance, including the island, of 2,401 
feet. The breakwater protects the west cove of San Luis 
Obispo Bay from storms approaching from the 
southwest. Existing project was adopted by 1888 River 
and Harbor Act (S. Doc. 81,49th Cong., 2d sess.). The 
authorized project, as modified by Congress in 1893 
and 1898, was completed in 1913. As authorized by 
1965 River and Harbor Act (H. Doc. 148, 88th Cong., 
Ist sess.), existing project was renamed Port San Luis, 
Calif., and modified to provide for rehabilitation of 
existing breakwater and construction of a 1,500-foot 
extension; construction of a detached breakwater 4,000 
feet long; removal of rock pinnacles; and dredging. 
Plane of reference is mean lower low water. Range 
19

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
between mean lower low water and mean higher high 
water is about 5.2 feet. Extreme range is about 9.5 feet. 
Approved estimated (1970) first cost for the modified 
project is $7,500,000, comprising $4,100,000 Federal 
(including $25,000 for U.S. Coast Guard expenses) and 
$3,400,000 non-Federal. 
Local cooperation. Local interests must contribute in 
cash 50 percent of first cost of detached breakwater; 
provide lands and rights-of-way for construction and 
future maintenance of improvements and for aids to 
navigation, including suitable spoil-disposal areas and 
necessary retaining dikes, bulkheads, and embankments 
therefor or cost of such retaining works; 
hold the United States free from damages; provide and 
maintain adequate service frontage and public landing 
with suitable supply facilities, necessary mooring 
facilities and utilities, and access roads, parking areas, 
and other necessary public-use shore facilities, open to 
all on equal terms; operate a general anchorage area or 
mooring facilities with reserved spaces adequate for 
accommodation of transient boats and for refuge, open 
to all on equal terms; secure and hold in the public 
interest all lands bordering development to a width 
sufficient for proper functioning of the harbor; provide 
and maintain at local expense adequate public 
terminal and transfer facilities, open to all on equal 
terms; provide and maintain depths in berthing areas 
commensurate with depths provided in the related 
project areas; make such utility and other relocations 
or alterations as may be required for project purposes, 
including removal of the existing Port San Luis wharf; 
provide or arrange for suitable marine-repair facilities; 
and provide a necessary access road for construction of 
general navigation facilities and first-stage commercial 
development. 
Terminal facilities. A commercial pier operated by 
Port San Luis Harbor District, an oil-handling pier 
operated by Union Oil Co., a recreational pier 
operated by San Luis Obispo County, a small U.S. 
Coast Guard pier, a dualrail small-craft launcher, a 
fuel and float landing at a 4.5-acre parking area, and 
marine elevator-ways. 
Operations and results during fiscal year. Project plan for 
modified project was continued. In addition, a reconnaissance 
and condition survey was conducted at a 
cost of $175. 
Condition at end of fiscal year. Project plan is about 99 
percent complete. Model studies are complete. 
8. SAN DIEGO HARBOR, CALIF. 
Location. On Pacific coast just north of United States- 
Mexico boundary line, about 109 miles southeast of Los 
Angeles and Long Beach Harbors. (See Coast and 
Geodetic Survey Chart 5107.) 
Previous projects. For details, see page 1976 of Annual 
Report for 1915 and page 1642 of Annual Report for 
1938. 
Existing project. A rubblemound jetty about 7,500 feet 
long on Zuniga Shoal; an entrance channel 40 feet 
deep, 800 feet wide, and about 12,000 feet long; 
removal of Middle Ground Shoal and widening 
entrance channel to the eastward in that vicinity to a 
depth of 36 feet; a bay channel 35 feet deep, 2,200 feet 
wide, and about 17,000 feet long, from near Whalers 
Bight to Naval Air Station; an anchorage area north of 
bay channel 1,200 feet wide, about 12,000 feet long, 
and 26 and 35 feet deep in the western and eastern 
halves, respectively; an approach to 26-foot anchorage, 
triangular in shape, 26 feet deep and 800 feet wide; an 
approach to 35-foot anchorage, triangular in shape, 35 
feet deep and 900 feet wide; a seaplane basin 8 feet 
deep, 1,500 feet wide, and about 12,000 feet long, 
landward of anchorage area; a turning basin 35 feet 
deep, opposite municipal piers; a channel 30 feet deep, 
1,500 to 2,500 feet wide, and about 20,000 feet long, in 
southern part of bay; a channel to National City and 
Chula Vista 20 feet deep, 200 feet wide, and about 2, 
600 feet long; a seaplane basin in southern part of bay 
10 feet deep, 5,000 to 8,500 feet wide, and about 21,000 
feet long, using a part of dredged material to fill an 
area of about 110 acres adjacent to southern end of 
basin; and an earthen dike about 7,735 feet long to 
divert the San Diego River from San Diego Bay to 
Mission Bay. Modification of existing project was 
authorized by 1968 River and Harbor Act (H. Doc. 
365, 90th Cong., 2d sess.), as follows: an entrance 
channel 42 feet deep and 800 feet wide, extending from 
deep water to mile 2.4, thence a channel 42 feet deep in 
the north bay, narrowing to 600 feet wide at mile 3.0 
and continuing at the same depth and width to mile 
6.57, with additional widening on the south side of the 
bend at mile 6.0; a trapezoidal turning basin about 2, 
800 feet long, 2,900 feet wide on the western side and 1, 
900 feet wide on the eastern side, all as originally 
dredged by the Navy; additional widening on the south 
side of the 42-foot channel at the bends at miles 3.0, 3.7, 
4.6, and 5.3 and on the north side of the 42-foot 
channel and turning basin between miles 6.0 and 7.1; 
dredging the central bay channel to a depth of 40 feet 
between miles 7.1 and 8.84 and to a depth of 35 feet 
between miles 8.84 and 12.0, with a turning basin 40 
feet deep between miles 8.25 and 8.84; a channel 30 
feet deep on either side of the 40-foot-deep channel, 
generally between pierhead lines, between channel 
miles 6.8 and 8.5; deepening and extending the south 
bay channel to a depth of 35 feet between miles 12.0 
and 13.5, with a turning basin 35 feet deep between 
miles 12.4 and 12.9; deleting from the existing project 
the uncompleted triangular approaches to the 26-footand 
35-foot-deep anchorage areas northward of the 
channel and adjacent to Harbor Island; and deleting 
from the existing project the undredged area at the 
south end of the seaplane basin in south bay. Plane of 
reference is mean lower low water. Range between 
mean lower low water and mean higher high water is 
5.7 feet. Extreme range is about 10.7 feet. Approved 
990

LOS ANGELES, CALIF., DISTRICT 
estimated (1970) first cost for project as modified is $12, 
140,000, comprising $8,570,000 Federal (including $1, 
860,000 for relocation of Navy utilities and $40,000 for 
aids to navigation by Coast Guard) and $3,570,000 
non-Federal. Dredging done with Navy funds in 1961 
increased depth in entrance channel from project 
depth of -40 feet mean lower low water to -42 feet mean 
lower low water. (See table 33-B for authorizing 
legislation.) 
Local cooperation. Local interests must contribute, in 
cash, 4.1 percent of the first cost of dredging, exclusive 
of the cost of spoil-retaining works, such contribution to 
be made in a lump sum prior to construction; provide 
all lands, easements, and rights-of-way required for 
construction and subsequent maintenance of project 
and for aids to navigation upon request of the Chief of 
Engineers, including suitable areas determined by the 
Chief of Engineers to be required in the general public 
interest for initial and subsequent disposal of spoil, and 
also provide necessary retaining dikes, bulkheads, and 
embankments therefor or the costs of such retaining 
works; hold and save the United States free from 
damages that may result from construction and 
maintenance of project; provide and maintain adequate 
public terminal and transfer facilities, open to 
all on equal terms; provide and maintain depths in 
berthing areas and local access channels serving the 
terminals commensurate with depths provided in 
related project areas; accomplish such utility or other 
relocations or alterations as necessary for project 
purposes, except for such utilities as are owned by the 
United States Navy; and establish regulations prohibiting 
discharge of pollutants into the waters of the 
harbor by users thereof, which regulations shall be in 
accordance with applicable laws or regulations of 
Federal, State, and local authorities responsible for 
pollution prevention and control. 
Terminal facilities. Consist of 45,250 linear feet of 
wharves, exclusive of Government-owned wharves, of 
which 20,290 linear feet are municipally owned and 25, 
360 linear feet are privately owned. Governmentowned 
wharves at North Island are restricted to 
military use only. Facilities are being expanded to meet 
increased commerce, primarily at National City and at 
Chula Vista. 
Operations and results during fiscal year. Initiated and 
completed maintenance repair of rubblemound jetty 
on Zuniga Shoal at a cost of $126,758 regular funds. In 
addition, reconnaissance and condition survey was 
conducted at a cost of $1,050. 
Condition at end of fiscal year. Completed maintenance 
repair of rubblemound jetty on Zuniga Shoal in June 
1970. No Federal work has been done on 1968 
modification of existing project. 
9. SAN DIEGO RIVER AND MISSION 
BAY, CALIF. 
Location. The San Diego River has its source on the 
tableland in the Cuyamaca Mountains near Santa 
Ysabel, Calif., and flows southwestward 52 miles to the 
Pacific Ocean at the City of San Diego. Mission Bay 
Harbor is adjacent to the outlet of the San Diego River, 
77 miles southeast of Los Angeles and Long Beach 
Harbors and 8 miles north of San Diego Harbor. 
Existing project. The project consists of a leveed flood 
channel 800 feet wide, with a capacity of 115,000 cubic 
feet per second, from 0.4 mile above Morena Boulevard, 
3.3 miles directly to the ocean; an altered 
railroad bridge over the leveed river flood channel; an 
entrance channel about 5,200 feet long, 670 feet wide, 
and 20 to 25 feet deep into Mission Bay; in the bay, a 
main channel and turning basin about 2,700 feet long, 
1,000 feet wide, and 20 feet deep, and two anchorage 
basins, one about 3,200 feet long, 600 feet wide, and 15 
feet deep, and the other about 1,600 feet long, ranging 
from 800 to 1,800 feet wide, and 20 feet deep; three 
jetties at the entrance; and stone revetment for the 
banks of the entrance and main channels and turning 
basin. The plane of reference is mean lower low water. 
The diurnal range is 4.4 feet. The extreme range is 9.5 
feet. Approved estimated (1970) first cost is $30,700, 
000 ($13,200,000 Federal and $17,500,000 non-Federal). 
The existing project was authorized by 1946 
River and Harbor Act. (See H. Doc. 760, 79th Cong., 
2d sess., which contains the latest published map.) This 
project modified the flood control project: "San Diego 
River Basin, Calif." (See H. Doc. 635, 77th Cong., 2d 
sess.) 
Local cooperation. Local interests have completed all 
requirements of local cooperation, except for construction 
of two bridges in connection with park 
development, which were to be built after completion 
of the project. Local intere sts reaffirmed their 
assurances of local cooperation by resolution dated 
May 25, 1965. 
Terminal facilities. None, with the exception of 
mooring facilities for recreational craft only. 
Operations and results during fiscal year. Preparation of 
the project plan for the proposed remedial work on 
existing project, covering deficiencies near the mouth 
of the San Diego River floodway, was completed. 
Initiated remedial work, consisting of extension of 
south jetty and repair of middle jetty, at a cost of $5,000 
regular funds. In addition, a reconnaissance and 
condition survey was conducted at a cost of $5,115. 
Condition at end of fiscal year. Construction was 
completed in September 1959. Remedial work is about 
10 percent complete. Project is being held open, 
pending demonstration of need of remedial construction 
in interior harbor (east anchorage of Quivira 
Basin). 
991

REPORT OF THE CHIEF .OF ENGINEERS, U.S. ARMY 1970 
10. SANTA BARBARA HARBOR, CALIF. 
Location. On Pacific coast, 90 miles northwest of Los 
Angeles Harbor and 320 miles southeast of San 
Francisco Harbor. (See Coast and Geodetic Survey 
Chart 5261.) 
Existing project. Maintenance dredging of depths 
existing in 1934 in harbor formed by breakwater 
constructed by local interests. Maintenance by means 
of a fixed sand-intercepting plant to be provided and 
operated by and at expense of local interests is 
permitted, the United States to make available for 
operation of the plant not exceeding $30,000 annually, 
whenever funds are allotted for such purpose, provided 
that there shall be deducted from such funds the actual 
cost of harbor maintenance found necessary if and 
when intercepting plant has been installed. Modification 
was authorized by 1962 River and Harbor Act 
(H. Doc. 518, 87th Cong., 2d sess.). See Annual Report 
for 1969 for detailed description. Plane of reference is 
mean lower low water. Range of tide between mean 
lower low water and mean higher high water is 5.4 feet. 
Extreme range is about 10 feet. Latest approved 
estimated (1969) first cost for project as modified is $6, 
810,000, comprising $3,480,000 Federal (including 
$40,000 for Coast Guard costs) and $3,330,000 non- 
Federal (including cash contribution of $3,320,000). 
Prior to adoption by Congress, work was authorized by 
Public Works Administration. (See table 33-B for 
authorizing legislation.) 
Local cooperation. Under plan for existing project, no 
specific local cooperation is required. However, $462, 
986 non-Federal funds made available by local 
interests were spent as follows: $450,322 to cover excess 
cost of depositing dredged material on the beach over 
estimated cost of similar dredging with disposal at sea; 
and $12,664 for dredging near pier formerly owned by 
the Navy. City of Santa Barbara entered into a 
contract with the United States to substitute, in lieu of 
fixed sand-intercepting plant, a movable dredge to 
work within protected area to shape the shoal resulting 
from travel of sand around breakwater so as to provide 
added protection within harbor and to pump surplus 
sand and future accretions from harbor area to 
downcoast beaches. The city will provide and operate a 
dredge of sufficient capacity to maintain an entrance 
channel into harbor with a minimum depth of 15 feet 
and a minimum width of 300 feet. Subject to 
availability of operation and maintenance funds, the 
United States will reimburse the city on or before June 
30 of each fiscal year not more than $30,000 toward 
actual cost of condition surveys and operation of 
dredge. This contract, dated March 6, 1956, was 
executed March 22, 1956, to be effective July 1, 1956. 
Under plan to modify existing project, local interests 
must give assurance they will hold the United States 
free from damages; provide and maintain necessary 
mooring facilities and utilities, including a public 
landing with suitable supply facilities open to all on 
equal terms in accordance with plans approved by the 
Chief of Engineers, first phase of development to be 
completed within 5 years after completion of general 
navigation facilities and full development to be 
completed within 15 years; provide or arrange for 
suitable marine-repair facilities; secure and hold in the 
public interest all lands bordering development to a 
width sufficient for proper functioning of harbor; bear 
any additional cost for replenishment of beach sands 
east of harbor over those costs required for maintenance 
dredging of general navigation features; 
contribute in cash 49 percent of construction cost; 
provide lands, easements, and rights-of-way for construction 
and future maintenance, including suitable 
spoil-disposal areas and necessary retaining dikes, 
bulkheads, and embankments therefor or cost of such 
retaining works; repair and seal existing west breakwater 
in accordance with plans approved by the 
District Engineer, and subsequent thereto transfer 
ownership of breakwater to the United States; construct 
sand fillet east of harbor concurrently with 
construction of east breakwater to assure continued 
replenishment of beach sands to downcoast beaches; 
and remove a portion of Stearn's wharf and make such 
other alterations or relocations required for navigation 
improvements. 
Terminal facilities. A wharf 2,200 feet long, a pier 335 
feet long, a landing float, an open mooring and slip 
anchorage for small craft, and a launching ramp for 
small craft. The wharf, which is equipped with loading 
facilities and facilities for small-craft repair, is used for 
general cargo and servicing fishing and oil-exploration 
boats. The pier, which was constructed by the Navy, is 
now operated by City of Santa Barbara and used for 
servicing pleasure craft and light commercial boats. 
Facilities are adequate for existing commerce. 
Operations and results during fiscal year. Condition 
surveys and maintenance-dredging reports submitted 
by City of Santa Barbara were audited. City of Santa 
Barbara was reimbursed $30,000 under terms of 
maintenance-dredging contract. Work on modified 
project plan was reclassified to "inactive" category 
because of lack of local support. 
Condition at end of fiscal year. City of Santa Barbara 
submitted evidence that it has maintained an adequate 
entrance channel into harbor. Work on modified 
project plan is inactive. 
11. VENTURA MARINA, CALIFORNIA 
Location. On coast of southern California about 65 
miles northwest of the City of Los Angeles, about'70 
miles northwest of Los Angeles and Long Beach 
Harbors, and about 6 miles northwest of Channel 
Islands Harbor in Ventura County. 
Existing project. Plan provides for maintenance of 
general navigation features of Ventura Marina, 
constructed by local interests, consisting of a north jetty 
1,254 feet long; a middle jetty 250 feet long; a south 
992

LOS ANGELES, CALIF., DISTRICT 
jetty 1,071 feet long; and an entrance channel 1,750 
feet long, 300 feet wide, and 20 feet deep. It further 
provides for modification of existing project by construction 
of an offshore breakwater 1,500 feet long; 
dredging about 800,000 cubic yards to form a sand trap 
in the lee of the breakwater; and construction of 
recreational fishing facilities on the jetty crests. Plane of 
reference is mean lower low water. Range between 
mean lower low water and mean higher high water is 
5.4 feet. Extreme range is about 10.2 feet. Approved 
estimated (1970) first cost for project is $3,120,000, 
comprising $1,580,000 Federal (including $40,000 for 
Coast Guard costs) and $1,540,000 non-Federal. 
Existing project was adopted by 1968 River and 
Harbor Act (H. Doc. 356, 90th Cong., 2d sess.). 
Local cooperation. Local interests must contribute, in 
cash, 50 percent of the first cost of construction, 
exclusive of aids to navigation; provide and maintain 
necessary mooring facilities and service areas, including 
a public landing with suitable supply facilities, 
a launching ramp, reservation of space for transient 
craft, parking areas with adequate sanitary facilities, 
and access roads, open to all on equal terms; hold and 
save the United States free from damages that may 
result from construction and maintenance of project; 
maintain recreational fishing facilities on jetty crests, 
including walkways, handrails, parking areas, and 
sanitation and water supply facilities; provide and 
maintain such additional works, including beach 
replenishment, as may be required for protection of 
beach areas south of harbor and not obtained through 
disposal of material dredged from sand trap and 
entrance channel; provide all lands, easements, and 
rights-of-way required for construction and maintenance 
of project and for aids to navigation upon 
request of the Chief of Engineers, including suitable 
disposal areas determined by the Chief of Engineers to 
be required in the general public interest for initial and 
subsequent disposal of spoil, and also necessary 
retaining dikes, bulkheads, and embankments therefor 
or the cost of such retaining works; and establish 
regulations prohibiting discharge of pollutants into the 
waters of the harbor by users thereof, which regulations 
shall be in accordance with applicable laws or 
regulations of Federal, State, and local authorities 
responsible for pollution prevention and control. 
Terminal facilities. A fuel dock; boat-repair facilities, 
with a 25-ton travelift; 106 boat slips; dry storage area 
for 90 boats; a 7-lane deluxe launch ramp; a yacht 
club; an international helicopter maintenance base; a 
restaurant and cocktail lounge; carpenter and divers 
shops; sportfishing; sightseeing cruises; yacht sales; 
marine communications; and an administration building. 
Construction of about 800 deluxe boat slips is 
scheduled for completion early in 1971. 
Operations and results during fiscal year. Completed 
preparation of project plan. Completed preparation of 
plans and specifications for breakwater construction. 
Completed maintenance dredging of entrance channel 
at a cost of $152,536 regular funds. In addition, a 
reconnaissance and condition survey was conducted at 
a cost of $3,685. 
Condition at end of fiscal year. Project plan is complete. 
Plans and specifications for breakwater construction 
are complete. Maintenance dredging of entrance 
channel was completed in January 1970. 
12. RECONNAISSANCE AND CONDITION 
SURVEYS 
See table 33-C. 
13. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 33-D. 
BEACH EROSION CONTROL 
14. COAST OF CALIFORNIA, POINT 
MUGU TO SAN PEDRO 
BREAKWATER, CALIF. 
Location. Proposed project is on California coast from 
Point Mugu to San Pedro breakwater at Los Angeles 
Harbor. 
Existing project. Plan provides for Federal participation 
by contribution of Federal funds toward cost 
of following protective features under modified master 
plan for development of shoreline of Los Angeles 
County: (a) Widening existing beaches to about 1,000 
feet between Topanga Canyon and Ballona Creek, and 
to about 300 feet between El Segundo and Redondo 
Beach breakwater and between proposed barrier groin 
near Topaz Street in Redondo Beach and Malaga 
Cove; (b) construction of nine groins between Topanga 
Canyon and Temescal Canyon and a barrier groin at 
Cabrillo Beach; (c) construction of five groins between 
Temescal Canyon and proposed entrance to Marina 
del Rey Harbor and a barrier groin near Topaz Street 
in Redondo Beach (all to be deferred, pending 
demonstration of need); (d) appurtenant drainage 
work comprising extension of seven storm-drain 
structures through widened beach; and (e) rehabilitation 
of Santa Monica breakwater. In accordance 
with 1956 River and Harbor Act, construction 
may be undertaken by Corps under arrangements 
explained under local cooperation. That 
part of the project between Topanga Canyon and El 
Segundo has been placed in an inactive category, 
pending the results of an authorized restudy of 
shoreline problems from Point Mugu to San Pedro 
breakwater. The active part, which extends from El 
Segundo to San Pedro breakwater, provides for (a) 
constructing groins at Topaz Street in Redondo Beach 
and at Cabrillo Beach and (b) widening existing 
beaches between El Segundo and Redondo Beach 
breakwater and between the groin at Topaz Street in 
Redondo Beach and Malaga Cove. Approved estimated 
(1970) first cost of the active part of the project 
993

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
is $7,900,000 ($3,950,000 Federal and $3,950,000 non- 
Federal). Existing project was adopted by 1954 River 
and Harbor Act (H. Doc. 277, 83d Cong., 2d sess.). 
Project document contains latest published map. 
Local cooperation. Local interests must adopt project 
plan of improvement and construct improvement 
unless the Corps agrees to construct improvement upon 
request of local interests and upon receipt of required 
contributed funds and, if needed, advanced funds from 
local interests. Local interests must also obtain approval 
of Chief of Engineers of detailed plans and 
specifications for prosecuting work before start of such 
work by local interests; provide lands, easements, and 
rights-of-way for accomplishment of work; hold the 
United States free from damages; prevent water 
pollution that would endanger health of bathers; and 
maintain continued public ownership of beaches and 
their administration for public use only. State of 
California or appropriate local authority must give 
satisfactory assurances that such protective measures 
will be maintained during useful life of project as may 
be required to serve its intended purpose. 
Operations and results during fiscal year. Initiated and 
completed plans and specifications for stone groin at 
Topaz Street in Redondo Beach. Awarded contract for 
construction. Initiated construction of stone groin at 
Topaz Street in Redondo Beach at a cost of $19,044 
required contributed funds and $19,043 advanced 
funds. Reimbursement of advanced funds was made. 
Condition at end of fiscal year. Barrier groin at Cabrillo 
Beach was completed in December 1962. Beach 
restoration downcoast from Topaz Street in Redondo 
Beach to Malaga Cove was completed in March 1969. 
Contract for construction was awarded in May 1970. 
Construction is about 16 percent complete. Design and 
plans and specifications for stone groin at Topaz Street 
in Redondo Beach are complete. 
15. SAN DIEGO (SUNSET CLIFFS), CALIF. 
Location. In the City of San Diego at Ocean Beach on 
Point Loma peninsula. (See Coast and Geodetic 
Survey Chart 5107.) 
Existing project. Plan provides for two segments of 
improvement. Segment A will consist of a protective 
recreational beach, generally 4,000 feet long and 200 
feet wide, to be created by placement of about 720,000 
cubic yards of suitable beach material along the shore 
from Santa Cruz Avenue to Osprey Street, and the 
construction of four stone groins to contain the fill. 
Segment B will consist of the construction of five 
sections of stone revetment, the construction of five 
stone dikes, and the sealing of two cave entrances, all 
between Osprey Street and Ladera Street. Approved 
estimated (1970) first cost is $2,120,000 ($1,060,000 
Federal and $1,060,000 non-Federal). Project was 
authorized by 1966 River and Harbor Act (H. Doc. 
477, 89th Cong., 2d sess.). 
Local cooperation. Local interests must contribute 50 
percent of the first cost of construction; provide lands 
and rights-of-way; hold the United States free from 
damages; assure that water pollution that would affect 
the health of bathers will not be permitted; assure 
maintenance of protective measures during the useful 
life of project, as may be required to serve their 
intended purpose; control surface water runoff and 
drainage to the extent that it will not endanger 
protective features to be constructed; provide public 
access to restored protective recreational beach and 
construct suitable appurtenant facilities to the extent 
necessary for realization of evaluated benefits; and 
assure continued public ownership of publicly owned 
shore and its administration for public use during the 
economic life of project, and assure continued availability 
for public use of privately owned shores 
involved in project where Federal aid is based on such 
use. 
Operations and results during fiscalyear. Initiated project 
plan and initiated plans and specifications for segment 
B. 
Condition at end of fiscal year. Project plan for segment B 
is about 99 percent complete. Plans and specifications 
for segment B are about 80 percent complete. Design 
and construction of segment A are held in abeyance, 
pending firm local support. 
16. SAN GABRIEL RIVER TO NEWPORT 
BAY (SURFSIDE-SUNSET AND 
NEWPORT BEACH), ORANGE 
COUNTY, CALIF. 
Location. Along the coast of southern California for 
about 12 miles from Anaheim Bay Harbor downcoast 
to Newport Bay Harbor. 
Existing project. Original authorized project provided 
for a single detached offshore rubblemound breakwater, 
located along the minus 24-foot contour just 
upcoast from the Newport Beach fishing pier, and the 
deposition of about 3,000,000 cubic yards of suitable 
beach-building material along the shoreline in the 
vicinity of Surfside-Sunset Beach to provide a protective 
beach. Existing project was modified in 1963 by 
Chief of Engineers to provide for relocating the 
breakwater near the mouth of the Santa Ana River, 
constructing four stone groins between the Santa Ana 
River and Newport Pier, depositing about 585,000 
cubic yard of sand upcoast from groins 3 and 4, 
increasing the 3,000,000 cubic yards of sand placement 
to 4,000,000. cubic yards at Surfside-Sunset Beach, and 
participating in annual periodic beach nourishment. 
Approved estimated (1970) first cost for modified 
project is $10,400,000 ($6,970,000 Federal and $3,430, 
000 non-Federal). Existing project was originally 
authorized by 1962 River and Harbor Act (H. Doc. 
602, 87th Cong., 2d sess.). 
Local cooperation. Local interests have responsibilities 
involved in connection with obtaining Federal as- 
994

LOS ANGELES, CALIF., DISTRICT 
sistance in the cost of projects for the control of beach 
erosion, and have indicated their ability and willingness 
to meet the conditions. Local interests must 
obtain approval by the Chief of Engineers of detailed 
plans and specifications and/or arrangements for 
prosecuting all or any one phase of the work prior to 
the commencement of such work; assure continued 
public ownership or continued public use of the shore 
upon which the amount of Federal participation is 
based and its administration for public use during the 
economic life of the project; assure maintenance and 
repair of the breakwater and periodic beach nourishment 
during the economic life of the project, as may 
be required to serve the intended purpose; provide, at 
their own expense, all necessary lands, easements, and 
rights-of-way; and control water pollution to the extent 
necessary to safeguard the health of bathers. 
Operations and results during fiscal year. Stage 3 construction, 
consisting of placement of about 900,000 
cubic yards of sand on the reach between 31st and 
Grant Streets at Newport Beach and construction of 
four stone groins-507-foot at 36th Street, 340-foot at 
48th Street (including existing groin), 340-foot at 52d 
Street, and 570-foot at 56th Street-was completed at a 
total cost of $555,279 regular funds and $141,398 
required contributed funds. A comprehensive surveillance 
program was continued for evaluation of 
project in order to plan stage 4 construction. Administered 
real estate. Reimbursement of advanced 
funds was made. 
Condition at end of fiscal year. Stage 1 construction, 
consisting of placement of beach fill on the beach at 
Surfside-Sunset Beach, was completed in June 1964. 
Stage 2 construction, consisting of placement of beach 
fill on the reach between 32d and 48th Streets at 
Newport Beach and construction of three steel sheetpile 
groins, was completed in November 1968. Stage 3 
construction, consisting of placement of beach fill on 
the reach between 31st and Grant Streets at Newport 
Beach and construction of four stone groins, was 
completed in November 1969. Planning for stage 4 
construction, which would consist of periodic placement 
of beach fill on the beach at Surfside-Sunset 
Beach, and rehabilitation of two steel groins and 
construction of one stone groin at Newport Beach, is 
under way. Stage 5 construction, which would consist 
of placement of beachfill on the beach at Newport 
Beach and construction of three stone groins, and stage 
6 construction, which would consist of construction of 
detached breakwater and one stone groin (extension of 
south jetty at Santa Ana River), have been deferred, 
pending further studies. 
17. INSPECTION OF COMPLETED BEACH 
EROSION CONTROL PROJECTS 
Inspection costs for fiscal year from regular funds for 
maintenance were $23,100. (See table 33-E on inspection 
of completed beach erosion control projects.) 
18. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECTS 
See table 33-F. 
19. BEACH EROSION CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
Beach erosion control activities pursuant to section 103, Public 
Law 87-874 (preauthorization) 
Fiscal year costs were $9,521 for Royal Palms Beach 
Park, Calif. 
FLOOD CONTROL 
20. ALAMO RESERVOIR, BILL WILLIAMS 
RIVER, ARIZ. 
Location. About 70 miles southeast of Kingman, Ariz., 
in a narrow gorge at river mile 39 on Bill Williams 
River, Ariz., a tributary of Colorado River. 
Existing project. A multiple-purpose dam and reservoir. 
Dam is a rolled-earthfill structure with a 
maximum height of 283 feet above streambed and a 
crest length of about 975 feet. Outlet works consist of a 
concrete-lined tunnel through the left abutment of 
dam, an approach channel, a bulkhead gate, a 
concrete intake structure with log racks at upstream 
tunnel portal, a control shaft and gate chamber just 
upstream from axis of dam, and an outlet channel that 
discharges into the river. The detached, broad-crested 
spillway with a crest length of 110 feet, which is on the 
right abutment, consists of an unlined channel 110 feet 
wide and 550 feet long excavated in rock and a 
concrete control sill at the crest. Reservoir has a total 
capacity at spillway crest of 1,045,300 acre-feet (May 
1968), including 200,000 acre-feet for sediment. Reservoir 
regulates runoff from a tributary area of 4,770 
square miles, reducing flow of design flood from 317, 
000 cubic feet per second to a maximum outflow of 7, 
000 cubic feet per second. Latest approved estimated 
(1967) first cost for project is $14,780,000, all Federal. 
Project was authorized by 1944 Flood Control Act (H. 
Doc. 625, 78th Cong., 2d sess.). 
Local cooperation. Local interests must assume responsibility 
for damage claims and adjust claims 
concerning water rights arising from improvement. In 
addition to providing assurances specified in authorizing 
legislation, local interests would limit manmade 
encroachment on existing hydraulic capacity of 
Bill Williams River channel downstream from Alamo 
Reservoir to permit maximum releases of 7,000 cubic 
feet per second from the reservoir. Arizona Senate Joint 
Resolution No. 1, 26th Legislature, First Regular 
Session, was signed by the Governor on March 15, 
1963, to furnish required assurances. 
Operations and results during fiscalyear. Maintained dam 
in good operating condition; continued acquisition of 
rights-of-way; administered real estate; continued 
preparation of reservoir-regulation manual and master 
plan. Completed preparation of operation and main- 
995

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
tenance manual. Costs were $16,209 for acquisition of 
rights-of-way; and $110,198 for construction of road 
and permanent operating equipment-both regular 
funds. 
Condition at end of fiscal year. Construction of dam and 
appurtenances was initiated in March 1965 and was 
completed in July 1968. Fish and wildlife management 
plan was completed in January 1968. Work remaining 
consists of minor completion items; completing acquisition 
of rights-of-way; and completing preparation 
of reservoir-regulation manual and master plan, which 
is 90 percent complete. 
21. GILA RIVER BASIN, ARIZ. 
21A. INDIAN BEND WASH 
Location. On Indian Bend Wash near Scottsdale, 
Ariz. 
Existing project. Plan provides for a concrete-lined 
channel extending along Indian Bend Wash for about 
7 miles from Arizona canal to Salt River; two channelinlet 
wing levees upstream from canal to divert and 
direct flows into channel; a siphon system to carry 
canal flow under channel; and a gated wasteway to 
divert canal flow into channel. Design flood of 40,000 
cubic feet per second would be controlled by improvement. 
Approved estimated (1970) first cost for 
project is $13,070,000 ($10,500,000 Federal and $2, 
570,000 non-Federal). Project was authorized by 1965 
Flood Control Act (H. Doc. 303, 88th Cong., 2d sess.). 
Local cooperation. Local interests must provide lands, 
easements, and rights-of-way, including spoil-disposal 
areas; accomplish modifications or relocations of 
highways, roads, bridges, utilities, streets, and irrigation 
facilities; hold and save the United States free 
from damages due to construction works; maintain and 
operate works after completion; prevent any encroachment 
upon improved channel that would reduce 
its flood-carrying capacity; and, at least annually, 
notify interests affected that project will not provide 
complete flood protection. 
Operations and results during fiscal year. Completed 
studies of a proposed modification to authorized plan 
developed by local interests. Initiated studies of an 
alternative proposed modification to authorized plan 
requested by local interests. 
Condition at end of fiscal year. Studies are complete. 
Hydrologic studies of alternative proposed modification 
to authorized plan requested by local interests 
are about 40 percent complete. 
21B. LOWER GILA RIVER LEVEE AND 
CHANNEL IMPROVEMENTS (GILA 
RIVER AND TRIBUTARIES 
DOWNSTREAM FROM PAINTED 
ROCK RESERVOIR) 
Location. Along lower Gila River from Texas Hill 
(river mile 66.5) to Gila siphon (river mile 8.4). 
Existing project. Plan provides for 99 miles of compacted, 
earthfill, revetted levee--49 miles along right 
bank and 50 miles along left bank. Leveed channel, 
trapezoidal in shape, will have a base width of 750 feet. 
Improvements would accommodate a design discharge 
of 50,000 cubic feet per second, measured at Dome 
(river mile 14). Approved estimated (1970) first cost for 
project is $35,800,000 ($35,100,000 Federal and $700, 
000 non-Federal). Project was authorized by 1962 
Flood Control Act (S. Doc. 116, 87th Cong., 2d sess.). 
Local cooperation. As modified by 1968 Flood Control 
Act (sec. 208, PL 90-483), local interests must make a 
cash contribution of $700,000, to be paid either in a 
lump sum prior to initiation of construction or in 
installments prior to start of pertinent work items in 
accordance with construction schedules, except that 
reasonable value of lands, easements, rights-of-way, 
and relocations furnished b y local interests shall be 
deducted from required cash contribution; hold and 
save the United States free from damages due to 
construction works; and maintain and operate works 
after completion. 
Operations and results during fiscal year. Initiated 
preparation of modified project plan. 
Condition at end of fiscal year. Modified project plan is 
about 40 percent complete. 
21C. MIDDLE GILA RIVER CHANNEL 
IMPROVEMENTS, UPPER END OF 
SAFFORD VALLEY TO BUTTES 
RESERVOIR SITE (CAMELSBACK 
RESERVOIR SITE TO SALT RIVER) 
Location. Improvements would extend along middle 
Gila River from the upper end of Safford Valley (river 
mile 435) to San Carlos Reservoir (river mile 357) and 
from mouth of San Pedro River (river mile 319) to 
Buttes Reservoir site (river mile 303). 
Existing project. Plan provides for a cleared floodway, 
extending about 94 miles along middle Gila River. 
Floodway is to be created by clearing phreatophytic 
growth by mechanical means from an area of about 14, 
200 acres, with a maximum width of about 4,000 feet 
and an average width of about 1,300 feet. There would 
be a net increase of 19,800 acre-feet of water available 
annually for agriculture as a result of the removal of the 
phreatophytic growth. Approved estimated (1970) first 
cost for project is $1,870,000, comprising $1,524,000 
Federal (including $814,000 for U.S. Geological 
Survey costs) and $346,000 non-Federal. Project was 
authorized by 1958 Flood Control Act (S. Doc. 5, 86th 
Cong., 1st sess.). 
Local cooperation. Local interests must provide lands 
and rights-of-way; hold the United States free from 
damages; maintain and operate works after completion; 
and keep cleared floodway free from encroachment. 
Operations and results during fiscal year. Initiated and 
completed plans and specifications for upstream 
996

LOS ANGELES, CALIF., DISTRICT 
Graham County reach of the middle Gila River outside 
the San Carlos Indian Reservation. Initiated clearing 
of phreatophytic growth in this reach. 
Condition at end offiscalyear. Clearing of phreatophytic 
growth in the upstream Graham County reach of the 
middle Gila River outside the San Carlos Indian 
Reservation is about 1 percent complete. This work 
was initiated May 25, 1970, and was stopped June 5, 
1970, as a result of issuance of a temporary court 
injunction obtained by conservation groups based on 
contention that provisions of the National Environmental 
Policy Act of 1969 had not been met. 
21D. PAINTED ROCK RESERVOIR (GILA 
RIVER) 
Location. On Gila River, mile 126, about 20 miles 
downstream from Gila Bend, Ariz., in Gila River 
Basin, which is a part of Colorado River Basin. 
Existing project. A rolled-earthfill dam with maximum 
height of 181 feet above streambed, crest length of 4, 
780 feet, and detached broad-crested spillway with a 
crest length of 610 feet; and a flood control reservoir 
with a gross capacity of 2,491,700 acre-feet (Mar. 1953) 
at spillway crest, including 200,000 acre-feet for 
sediment. Operation of reservoir regulates runoff from 
a tributary area of 50,800 square miles, reducing flow 
of standard project flood of 300,000 cubic feet per 
second to a maximum outflow of 22,500 cubic feet per 
second. Latest approved estimated (1965) first cost for 
project is $19,193,000, all Federal, including $13,000 
for Code 710 recreation project. Project was authorized 
by 1950 Flood Control Act (H. Doc. 331, 81st Cong., 
1st sess.). 
Local cooperation. Local interests must adjust waterrights 
claims that might result from improvement and 
keep flood channel of Gila River downstream from 
Painted Rock free from encroachment. 
Operations and results during fiscal year. Operations 
consisted of maintaining dam in good operating 
condition and administering real estate. Acquisition of 
rights-of-way continued. 
Condition at end of fiscal year. Construction of dam and 
appurtenances was initiated in 1958 and was completed 
in December 1959. Construction of culvert was 
completed in August 1967. Work remaining consists of 
completing acquisition of rights-of-way and updating 
master plan. 
21E. PHOENIX, ARIZ., AND VICINITY 
(INCLUDING NEW RIVER) 
Location. On Cave Creek and its tributaries and on 
Skunk Creek, Dreamy Draw, New River, and Agua 
Fria River in and adjacent to metropolitan Phoenix, 
Ariz. 
Existing project. Plan provides for four detention 
basins, one each on Cave Creek, an unnamed tributary 
of Skunk Creek, New River, and Dreamy Draw; 
Union Hills diversion channel, Arizona canal diversion 
channel, and diversion channel on Skunk Creek to 
divert floods to Adobe detention basin on unnamed 
tributary of Skunk Creek; and channel improvements 
on Cave Creek, Dreamy Draw, Skunk Creek, New 
River, and Agua Fria River. Plan also provides for 
controlling as much of the floodflow as possible in the 
drainage area involved; for diverting residual flows in 
Deer Valley and Cave Creek to Skunk Creek; and for 
improving Skunk Creek, New River, and Agua Fria 
River to accommodate those residual flows. Approved 
estimated (1970) first cost is $97,600,000 ($80,200,000 
Federal and $17,400,000 non-Federal). Project was 
authorized by 1965 Flood Control Act (H. Doc.216, 
89th Cong., 1st sess.). 
Local cooperation. Local interests must provide lands, 
easements, and rights-of-way, including spoil-disposal 
areas; perform construction, alteration, or relocation of 
highways, roads, highway bridges, utilities, and street 
modifications; hold and save the United States free 
from damages due to construction works; maintain and 
operate works after completion; prevent any encroachment 
upon existing or improved channels or 
within detention basin areas that would reduce their 
flood-carrying or storage capacities; and hold and save 
the United States free from damages arising from 
water-rights claims resulting from construction, maintenance, 
and operation of project. 
Operations and results during fiscal year. Continued 
preparation of project plan. 
Condition at end of fiscal year. Project plan is about 30 
percent complete. 
21F. SANTA ROSA WASH (TAT 
MOMOLIKOT DAM AND ST. CLAIR 
RESERVOIR) 
Location. On Santa Rosa Wash in Papago Indian 
Reservation and about 6.5 miles upstream from Vaiva 
Vo, Ariz. 
Existing project. Plan provides for a rolled-earthfill 
dam with a maximum height of 66 feet above 
streambed, a crest length of about 3 miles, and a 
detached spillway with a crest length of 1,000 feet; a 
multiple-purpose reservoir with a capacity of 181,000 
acre-feet at spillway crest, comprising 126,000 acre-feet 
for flood control, 15,000 acre-feet for water conservation, 
and 40,000 acre-feet for sediment; and the 
development of 1,640 acres of cultivated land in Vaiva 
Vo irrigation project, which is authorized for construction 
by U.S. Bureau of Indian Affairs on Papago 
Indian Reservation downstream from dam. Operation 
of reservoir will regulate runoff from a tributary area of 
1,750 square miles, reducing flow of standard project 
flood of 55,000 cubic feet per second to a maximum 
outflow of 4,600 cubic feet per second. Approved 
estimated (1970) Federal first cost is $9,580,000, 
including $1,560,000 Bureau of Indian Affairs costs. 
89th Cong., 1st sess.). 
997

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Local cooperation. Local interests must establish and 
enforce floodway limits and regulations for Santa Rosa 
Wash on non-Indian land downstream from Papago 
Indian Reservation and maintain hydraulic capacity 
of existing channel; hold United States free from 
damages (downstream from Papago Indian Reservation) 
arising from construction, operation, and 
maintenance of project for flood control and arising 
from water-rights claims resulting from construction, 
operation, and maintenance of project for flood 
control. U.S. Bureau of Indian Affairs would assure 
maintenance of hydraulic capacity of Santa Rosa 
Wash on Indian lands downstream from Tat Momolikot 
Dam; and provide for adjusting water-rights 
claims resulting from construction, operation, and 
maintenance of project for water conservation, fish, 
wildlife, and recreation purposes. The Papago Tribal 
Council would make available appropriate rights to 
lands required for construction of the dam and 
reservoir. 
Operations and results during fiscal yea r. Continued 
preparation of project plan. Initiated preparation of 
plans and specifications for access road and modification 
of Highway Route 15. 
Condition at end of fiscal year. Project plan is 99 percent 
complete. Plans and specifications are about 75 percent 
complete. 
21G. WHITLOW RANCH RESERVOIR, 
QUEEN CREEK 
Location. On Queen Creek, Ariz., a tributary of Gila 
River, about 10 miles west of Superior, Ariz. 
Existing project. A flood control dam and reservoir. 
Dam is a compacted-earthfill zoned structure with a 
maximum height of 149 feet above streambed and a 
crest length of 837 feet. Outlet works, which are at left 
abutment, consist of an intake structure; an ungated 
outlet conduit; and an outlet-and-diversion structure. 
The spillway, an unlined structure about 4,000 feet 
north of dam, consists of a broad-crested weir about 355 
feet long; an approach channel 1,080 feet long; and a 
downstream channel about 1,300 feet long. Reservoir 
has a total capacity at spillway crest of 35,890 acre-feet 
(May 1957), of which 7,000 acre-feet are allocated for 
sediment. Reservoir regulates runoff from a tributary 
area of 143 square miles, reducing flow of design flood 
from 110,000 to 1,000 cubic feet per second. First cost 
for project was $1,867,963, all Federal, including $3, 
758 for Code 710 recreation project. Project was 
authorized by 1946 Flood Control Act (H. Doc. 220, 
80th Cong., 1st sess.). 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Operations 
consisted of maintaining dam in good operating 
condition, continuing acquisition of rights-of-way, and 
administering real estate. 
Condition at end of fiscal year. Construction was started 
in May 1959 and completed in November 1960. Work 
remaining consists of completing acquisition of rightsof-
way, preparing reservoir-regulation manual, and 
updating master plan. 
22. LOS ANGELES COUNTY DRAINAGE 
AREA, CALIFORNIA 
Location. Site of improvement is along Los Angeles 
and San Gabriel Rivers, Rio Hondo, and Ballona 
Creek, and tributaries thereof in Los Angeles County, 
Calif. 
Previous project. For details, see pages 1768 to 1772 of 
Annual Report for 1941; page 1602 of Annual Report 
for 1942; and page 1535 of Annual Report for 1943. 
Existing project. Plan provides for flood control 
improvements in four stream basins in Los Angeles 
County, Calif., as follows: Los Angeles River Basin, 
San Gabriel River Basin, Rio Hondo Basin, and 
Ballona Creek Basin. Provides for protection of about 
325,000 acres in densely populated Los Angeles 
County, including areas in Los Angeles, Pasadena, 
Glendale, Burbank, and other cities. Plan provides for 
construction of five flood control reservoirs (Hansen, 
Lopez, Santa Fe, Sepulveda, and Whittier Narrows); 
debris basins at mouths of 22 canyons; channel 
improvements along 101.3 miles of Los Angeles River, 
San Gabriel River, Rio Hondo, and Ballona Creek; 
and channel improvements along 193.69 miles of 
tributary channels. All units of improvement are 
physically completed in those four stream basins, 
except those listed below, and are described in Annual 
Report for 1962. 
Unit of improvement not physically completed in 
San Gabriel River Basin is Thompson Creek and San 
Jose Wash (including San Jose Creek): Minor completion 
items. 
Unit of improvement not physically completed in 
Rio Hondo Basin is Sierra Madre Wash. Plan provides 
for the construction of about 1.7 miles of concrete 
channel on Sierra Madre Wash extending from inlet to 
existing Santa Anita Wash channel. (See tables 33-B 
and 33-G for authorizing legislation and estimated first 
costs for all units of improvement under existing 
project.) 
Local cooperation. Local interests must furnish lands 
and rights-of-way; bear expense of highway and 
highway-bridge modifications; hold the United States 
free from damages; and maintain and operate works 
after completion for following units or parts of units: 
Los Angeles River Basin: 
Blanchard Canyon 
Blue Gum Canyon 
Burbank-Eastern system 
Burbank-Western system (lower and upper) 
Caballero Creek 
Compton Creek: 
Hooper Avenue storm drain to Main 
Street 
Los Angeles River to Alameda Street 
998

LOS ANGELES, CALIF., DISTRICT 
Dead Horse Canyon and Royal Boulevard 
channel 
Haines Canyon: Plainview Avenue to 
Tujunga Wash 
Lopez Canyon diversion 
Los Angeles River channel: 
Owensmouth Avenue to Lankershim 
Boulevard 
Stewart and Gray Road to Santa Ana 
Branch, Pacific Electric railway bridge 
Santa Ana Branch, Pacific Electric 
railway bridge to Pacific Ocean 
Pacoima Wash channel 
Sycamore Wash channel 
Tujunga Wash channel 
Verdugo Wash: Concord Street to debris 
basin 
Wilson Canyon and Mansfield Street channel 
Winery Canyon 
San Gabriel River Basin: 
Coyote Creek 
Emerald Wash and Live Oak Wash 
Marshall Creek 
San Gabriel River channel: 
Santa Fe flood control reservoir to 
Whittier Narrows flood control 
reservoir 
Whittier Narrows flood control reservoir 
to the Pacific Ocean 
Thompson Creek and San Jose Wash 
(including San Jose Creek) 
Walnut Creek inlet channel 
Walnut Creek system 
Rio Hondo Basin: 
Alhambra Wash channel: Valley Boulevard to 
Rio Hondo 
Arcadia Wash system 
Eaton Wash 
Rio Hondo channel: 
Peck Road to Rosemead Boulevard 
(upper) 
Whittier Narrows flood control reservoir 
to Los Angeles River (lower) 
Rubio Canyon diversion 
Santa Anita Wash 
Sawpit Wash 
Sierra Madre Villa channel 
Sierra Madre Wash 
Ballona Creek Basin: 
Ballona Creek channel downstream from inlet 
to Washington Boulevard and downstream 
from La Salle Avenue to the lagoon 
Benedict Canyon system 
Centinela Creek 
Sawtelle-Westwood system (including 
Sepulveda channel). 
No local cooperation is required for other units or 
parts of units in existing project. Information on 
amount expended by local interests in connection with 
existing project is in table 33-H, "Project Costs to June 
30, 1970." 
Operations and results during fiscal year. Operations for 
units in Los Angeles River Basin: (a) Compton Creek: 
Maintained channel in good operating condition from 
Alameda Street to Hooper Avenue storm drain and 
administered real estate. (b) Haines Canyon: Maintained 
debris basin and channel upstream from 
Plainview Avenue in good operating condition and 
administered real estate. (c) Hansen flood control 
reservoir: Initiated preparation of reservoir regulation 
manual, maintained dam in good operating condition, 
and administered real estate. (d) Lopez flood control 
reservoir: Maintained dam in good operating condition 
and administered real estate. (e) Los Angeles 
River channel, Lankershim Boulevard to Stewart and 
Gray Road: Maintained channel in good operating 
condition and administered real estate. (f) Sepulveda 
flood control reservoir: Continued preparation of 
reservoir-regulation manual, maintained dam in good 
operating condition, and administered real estate. 
Operations for units in San Gabriel River Basin: (a) 
Santa Fe flood control reservoir: Completed preparation 
of reservoir-regulation manual, continued 
preparation of master plan, maintained dam in good 
operating condition, and administered real estate. (b) 
San Gabriel River channel, San Gabriel Canyon to 
Santa Fe flood control reservoir, Approach channel to 
Santa Fe flood control reservoir (remedial work): 
Contract adjustment. Continued acquisition of rightsof-
way and administered real estate. (c) Thompson 
Creek and San Jose Wash (including San Jose Creek): 
Awarded contract for paving access berms along 
channel banks of part 3 of San Jose Creek. (d) Whittier 
Narrows flood control reservoir: Maintained dam in 
good operating condition and administered real estate. 
Operations for units in Rio Hondo Basin: (a) 
Alhambra Wash: Maintained channel upstream from 
Valley Boulevard in good operating condition and 
administered real estate. (b) Sierra Madre Wash: 
Continued preparation of plans and specifications for 
Sierra Madre Wash channel upstream from Orange 
Grove Avenue. 
Operations for unit in Ballona Creek Basin: Ballona 
Creek channel and jetties: Maintained channel downstream 
from Washington Boulevard to La Salle 
Avenue and downstream from Los Angeles city 
boundary to ocean, jetties, and Pacific Avenue bridge 
in good operating condition, and administered real 
estate. Completed reimbursement to local interests in 
fiscal year 1969 for rights-of-way at a cost of $1,492 
regular funds. 
Condition at end of fiscal year. Basic operation and 
maintenance manual for channel and debris-basin 
units in Los Angeles County drainage area project is 
complete, and inserts are complete for some units that 
are constructed. Work remaining on this manual 
consists of completing inserts. 
999

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Los Angeles River Basin: (a) Compton Creek (Los 
Angeles River to Hooper Avenue storm drain): Work 
remaining consists of reimbursements to local interests 
for rights-of-way. (b) Haines Canyon: Work remaining 
consists of reimbursement to local interests for rights-ofway. 
(c) Hansen flood control reservoir: Dam was 
completed in April 1940. Work remaining consists of 
completing reservoir-regulation manual and updating 
master plan. (d) Lopez flood control reservoir: Dam 
was completed in November 1954. Work remaining 
consists of preparing reservoir-regulation manual and 
master plan. (e) Los Angeles River channel, Lankershim 
Boulevard to Stewart and Gray Road: Work 
remaining consists of reimbursements to local interests 
for rights-of-way. (f) Sepulveda flood control reservoir: 
Dam was completed in December 1941. Work remaining 
consists of completing reservoir-regulation 
manual and updating master plan. (g) Verdugo Wash, 
Concord Street to debris basin: Work remaining 
consists of reimbursements to local interests for rightsof-
way. 
San Gabriel River Basin: (a) Santa Fe flood control 
reservoir: Unit was completed in January 1949. Work 
remaining consists of completing master plan, which is 
55 percent complete. (b) San Gabriel River channel, 
San Gabriel Canyon to Santa Fe flood control 
reservoir, Approach channel to Santa Fe flood control 
reservoir (remedial work): Work remaining consists of 
completing rights-of-way acquisition. (c) Thompson 
Creek and San Jose Wash (including San Jose Creek): 
Work remaining on Thompson Creek and San Jose 
Wash consists of preparing plans and specifications for 
landscaping rights-of-way along channel banks in area 
of a city park on part 3b and of constructing. Work 
remaining on San Jose Creek consists of paving access 
berms along banks of part 3. (d) Whittier Narrows 
flood control reservoir: Unit was completed in June 
1957. Work remaining consists of updating master 
plan. 
Rio Hondo Basin: Work remaining consists of 
completing plans and specifications for Sierra Madre 
Wash channel upstream from Orange Grove Avenue, 
which are about 88 percent complete, and completing 
construction of unit. 
See table at end of chapter for project costs to June 
30, 1970. 
23. LYTLE AND WARM CREEKS, SANTA 
ANA RIVER BASIN, CALIF. 
Location. Near San Bernardino and Colton, San 
Bernardino County, Calif. 
Existing project. Plan provides for a rectangular 
concrete channel extending for 3.5 miles along East 
Branch of Lytle Creek from existing Foothill Boulevard 
inlet structure to Warm Creek; levees extending along 
both sides of Warm Creek for 1.1 miles from confluence 
with East Branch of Lytle Creek to Santa Ana River; 
and a leveed channel extending about 1 mile along 
Santa Ana River from mouth of existing East Twin and 
Warm Creeks concrete channel to mouth of existing 
natural channel of Warm Creek. Design capacities of 
improvements will be: East Branch of Lytle Creek, 58, 
000 cubic feet per second; Warm Creek, 60,000 to 90, 
000 cubic feet per second; and Santa Ana River, 156, 
000 cubic feet per second. Approved estimated (1970) 
first cost is $16,310,000 ($13,900,000 Federal and $2, 
410,000 non-Federal). Project was authorized by 1965 
Flood Control Act (S. Doc. 53, 89th Cong., 1st sess.). 
Local cooperation. Local interests must provide lands 
and rights-of-way; pay for necessary highway and 
utility relocations; maintain and operate works after 
completion; hold the United States free from damages; 
adjust water-rights claims resulting from project; and 
prevent any encroachment that would reduce floodcarrying 
capacities of levee and channel improvements. 
Operations and results during fiscal year. Continued 
preparation of project plan. Initiated plans and 
specifications for first two contracts. 
Condition at end of fiscal year. Project plan is about 98 
percent complete. Plans and specifications for first two 
contracts are about 30 percent complete. 
24. MOJAVE RIVER BASIN, CALIF. 
24A. MOJAVE RIVER RESERVOIR 
Location. Reservoir will be on Mojave River, immediately 
below confluence of Deep Creek and West 
Fork of Mojave River and about 14 miles upstream 
from Victorville, in Mojave River Basin, Calif. 
Existing project. Project-document plan of improvement 
provided for construction of a flood control 
dam and reservoir on the West Fork of Mojave River. 
In 1964, project was modified to substitute a dam at the 
Forks site to provide regulation of floods on not only 
West Fork of Mojave River but also Deep Creek. The 
modified plan provides for a rolled-earthfill dam with a 
maximum height of 200 feet above streambed, a crest 
length of 2,200 feet, and a detached spillway with a 
crest length of 200 feet; and a reservoir with a capacity 
of 89,700 acre-feet at spillway crest, comprising 78,700 
acre-feet for flood control and 11,000 acre-feet for 
sedimentation. Operation of the reservoir will regulate 
runoff from a tributary area of 215 square miles, 
reducing flow of standard project flood of 94,000 cubic 
feet per second to a maximum outflow of about 23,500 
cubic feet per second. Approved estimated (1970) first 
cost for project is $17,190,000 ($16,900,000 Federal 
and $290,000 non-Federal). Project was authorized by 
1960 Flood Control Act (H. Doc. 164, 86th Cong., 1st 
sess.). Modification of project was authorized by the 
Chief of Engineers on November 27, 1964. 
Local cooperation. Local interests must hold the United 
States free from damages from water-rights claims 
resulting from construction and operation of project; 
prevent encroachment harmful to existing channel 
1000

LOS ANGELES, CALIF., DISTRICT 
downstream from reservoir; and maintain channel 
capacity of not less than 23,500 cubic feet per second 
through improved areas. In addition, local interests 
have agreed to operate and maintain recreation 
facilities constructed by the United States and to 
construct, operate, and maintain such future recreation 
facilities as may be required in addition to those 
constructed by the United States. Local interests 
contributed $250,000 in consideration of land-enhancement 
benefits provided by modified project. 
Operations and results during fiscal year. Continued 
construction of dam and appurtenances. Continued 
preparation of plans and specifications for relocations 
and recreational facilities and continued preparation 
of operation and maintenance manual. Costs were $3, 
659,998 for construction of dam and appurtenances; 
$11,256 for acquisition of rights-of-way; and $1,540 for 
relocations-all regular funds. Costs were $3,000 for 
construction of dam and $16,000 for relocations from 
other contributed funds. Continued acquisition of 
rights-of-way and administered real estate. 
Condition at end of fiscal year. Work remaining consists 
of completing plans and specifications for and constructing 
recreational development and relocations, 
which are about 80 percent complete; completing 
acquisition of rights-of-way; completing construction 
of dam and appurtenances, which is about 59 percent 
complete; completing preparation of operation and 
maintenance manual, which is about 20 percent 
complete; and preparing reservoir-regulation manual 
and master plan. 
24B. ORO GRANDE WASH CHANNEL 
IMPROVEMENTS 
Location. On Oro Grande Wash at Victorville, San 
Bernardino County, Calif. 
Existing project. Consists of 6,403 feet of channel 
improvement and 470 feet of inlet wing levees in the 
southern part of Victorville and extends from a point 
about 700 feet downstream from the junction of 
Hesperia Road and Center Street southeastward about 
1.2 miles to the Mojave River. Latest approved 
estimated (1968) first cost for project is $1,800,000 ($1, 
000,000 Federal and $800,000 non-Federal). Existing 
project approved by Chief of Engineers, July 24, 1967, 
under provisions of section 205, 1948 Flood Control 
Act, as amended. 
Local cooperation. Local interests must furnish lands, 
easements, and rights-of-way; bear cost of highway and 
highway bridge construction and alterations and utility 
relocations; prevent any future encroachment on 
project channel; adjust claims concerning water rights; 
hold and save the United States free from claims for 
damages due to construction works; perform any work 
made necessary by the effect of flood control on stream 
regimen; maintain and operate works after completion; 
at least annually notify interests affected that 
project will not provide complete flood protection; and 
assume full responsibility for costs in excess of Federal 
limitation. Local interests supplied assurances. 
Operations and results during fiscal year. Continued 
preparation of operation and maintenance manual. 
Condition at end of fiscal year. Construction of project 
was completed in March 1969. Work remaining 
consists of completing operation and maintenance 
manual, which is 87 percent complete. 
25. NEEDLES, SAN BERNARDINO 
COUNTY, CALIF. 
Location. On "S" Street Wash at Needles, Calif., 
which is about 280 miles east and north of Los Angeles, 
Calif., and 100 miles southeast of Las Vegas, Nev. 
Existing project. Plan provides for a channel (part 
trapezoidal and part rectangular), together with two 
inlet levees, a diversion levee, and a diversion channel, 
extending from the Colorado River upstream through 
Needles, along the "S" Street Wash, to a point about 
540 feet south of the Atchison, Topeka and Santa Fe 
railroad, and for a diversion levee and two deflection 
levees in the upstream area of "S" Street Wash in the 
vicinity of Eagle Pass. Improvements would control 
standard project flood of 14,000 cubic feet per second in 
"S" Street channel and 21,000 cubic feet per second in 
Eagle Pass diversion. Approved estimated (1970) first 
cost for project is $1,452,000 ($1,000,000 Federal and 
$452,000 non-Federal). Existing project approved by 
Chief of Engineers, March 11, 1970, under provisions 
of section 205, 1948 Flood Control Act, as amended. 
Local cooperation. Local interests must provide lands, 
easements, and rights-of-way; hold and save the 
United States free from claims and damages; maintain 
and operate works after completion; provide relocations 
of highways, roads, streets, bridges, and 
utilities; prevent any encroachment or dumping on 
improved channel after completion; limit manmade 
encroachment on existing hydraulic capacity of Airport 
Wash to permit maximum flows of 28,000 cubic 
feet per second; and assume costs in excess of Federal 
limitation. Local interests supplied assurances. 
Operations an d results during fiscal year. Completed 
detailed project report. Initiated plans and specifications. 
Condition at end of fiscal year. Plans and specifications 
are about 15 percent complete. 
26. PINE AND MATHEWS CANYONS 
RESERVOIRS, COLORADO RIVER 
BASIN, NEV. 
Location. In Lincoln County, Nev., about 100 miles 
north of Hoover Dam and about 17 and 20 miles, 
respectively, east of Caliente, Nev. 
Existing project. Reservoirs are interdependent units of 
a project for protection of lands and improvements 
against floods, each unit consisting of a dam and a 
reservoir. Operation of Pine Canyon Reservoir reg- 
1001

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
ulates runoff from a tributary area of 45 square miles, 
reducing standard project flood from 10,500 to 322 
cubic feet per second. Operation of Mathews Canyon 
Reservoir regulates runoff from a tributary area of 34 
square miles, reducing standard project flood from 8, 
500 to 260 cubic feet per second. First cost of new work 
for completed project was $1,401,248, all Federal. 
Project was authorized by 1950 Flood Control Act (H. 
Doc. 530, 81st Cong., 2d sess.). For further project 
description, see page 1355 of Annual Report for 1967. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Operations 
consisted of maintaining dams in good condition and 
administering real estate. 
Condition at end of fiscalyear. Construction of reservoirs 
was completed in December 1957. Work remaining 
consists of preparing reservoir-regulation manual. 
27. ROSE CREEK CHANNEL 
IMPROVEMENTS, SAN DIEGO, CALIF. 
Location. On Rose Creek at San Diego, San Diego 
County, Calif. 
Existing project. Plan provides for deepening and 
widening existing creekbed for constructing a reinforced-
concrete rectangular channel and a trapezoidal 
earth-bottom channel with stone-revetted side 
slopes for a total length of 0.75 mile, extending 
southward from a point near U.S. Highway 101 
freeway bridge to Grand Avenue bridge at Mission 
Bay. Latest approved estimated (1968) first cost for 
project is $1,025,000 ($905,000 Federal and $120,000 
non-Federal). Existing project approved by Chief of 
Engineers, October 23, 1967, under provisions of 
section 205, 1948 Flood Control Act, as amended. 
Local cooperation. Local interests must provide lands 
and rights-of-way; hold the United States free from 
damages; maintain and operate works after completion; 
provide assurances that encroachment or 
dumping within the limits of the channel rights-of-way 
will not be permitted; and pay costs in excess of the 
Federal limitation. Local interests supplied assurances. 
Operations and results during fiscal year. Initiated and 
completed construction of project at a cost of $801,245 
regular funds, $226,842 required contributed funds, 
and $154,733 other contributed funds. 
Condition at end of fiscal year. Construction of project 
was completed in March 1970. 
28. SAN DIEGO RIVER (MISSION 
VALLEY), SAN DIEGO RIVER BASIN, 
CALIF. 
Location. Along San Diego River in Mission Valley, 
San Diego County, Calif. 
Existing project. Plan provides for about 27,500 feet of 
rectangular reinforced-concrete channel extending 
from near Zion Avenue in Grantville to just upstream 
from existing flood control channel at Morena Boulevard; 
two inlet levees at upstream end and a 
transition at downstream end to provide a connection 
with existing channel; and short rectangular reinforcedconcrete 
channels along downstream reaches 
of three tributary streams (Alvarado, Murphy, and 
Murray Canyons). Improvements will control standard 
project flood of 115,000 cubic feet per second in 
San Diego River, 17,000 cubic feet per second in 
Alvarado Canyon, 14,000 cubic feet per second in 
Murphy Canyon, and 6,000 cubic feet per second in 
Murray Canyon. Approved estimated (1970) first cost 
for project is $31,000,000 ($20,200,000 Federal and 
$10,800,000 non-Federal). Project was authorized by 
1965 Flood Control Act (H. Doc. 212, 89th Cong., 1st 
sess.). 
Local cooperation. Local interests must provide lands, 
easements, and rights-of-way; hold and save the 
United States free from damages due to construction 
works; maintain and operate works after completion; 
accomplish construction or relocations of highways, 
roads, bridges, utilities, and storm drains; prevent 
encroachment on improved channels that would 
reduce their flood-carrying capacities; and contribute 
11.5 percent of construction costs, presently estimated 
to be $2,500,000 apportioned share to be borne due to 
land enhancement benefits. 
Operations and results during fiscal year. Continued 
preparation of project plan. 
Condition at end of fiscal year. Project plan is about 40 
percent complete. 
29. SANTA ANA RIVER BASIN (AND 
ORANGE COUNTY), CALIF. 
Location. On Santa Ana River and tributaries and on 
other streams in Orange, Riverside, and San Bernardino 
Counties, Calif. 
General plan of improvement. Although a single comprehensive 
plan for flood control has been developed 
for Santa Ana River Basin, improvements provided are 
divided into two projects in accordance with congressional 
authorizations. Santa Ana River Basin (and 
Orange County) project, the first of these two projects, 
provides for protection of metropolitan area of Orange 
County, which includes some areas outside Santa Ana 
River Basin, and flood control on San Antonio, Chino, 
Lytle, and Cajon Creeks. Santa Ana River Basin 
project, the second of these two projects, provides for 
flood control in other areas of basin. Active units of first 
project are described in Annual Report for 1968. For 
pertinent information on second project, see "Other 
Authorized Flood Control Projects." 
Existing project. (See tables 33-B and 33-I for 
authorizing legislation and latest approved estimated 
Federal first cost for all units.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Operations for 
units in existing project: (a) Brea Reservoir: Main- 
1002

LOS ANGELES, CALIF., DISTRICT 
tained dam in good operating condition, administered 
real estate, completed preparation of reservoir-regulation 
manual, and continued updating master plan. 
(b) Carbon Canyon Reservoir and channel: Maintained 
project in good operating condition and 
administered real estate. (c) Fullerton Reservoir: 
Maintained dam in good operating condition, completed 
preparation of reservoir-regulation manual, 
initiated preparation of master plan, and administered 
real estate. (d) Prado Reservoir: Maintained dam in 
good operating condition, administered real estate, and 
continued preparation of reservoir-regulation manual. 
(e) San Antonio Reservoir: Maintained dam in good 
operating condition and administered real estate. (f) 
San Antonio and Chino Creeks channel: Maintained 
project in good operating condition and administered 
real estate. 
Condition at end of fiscal year. Work remaining consists 
of completing basic operation and maintenance 
manual, which is 87 percent complete, and completing 
inserts for channel and levee improvements (Lytle and 
Cajon Creeks channel improvements and San Antonio 
and Chino Creeks channel). Other information for 
units in existing project: (a) Brea Reservoir: Dam was 
completed in March 1942. Work remaining consists of 
updating master plan. (b) Carbon Canyon Reservoir 
and channel: Construction of project was started in 
May 1959 and was completed in May 1961. Work 
remaining consists of completing master plan, which is 
25 percent complete. (c) Fullerton Reservoir: Dam was 
completed in May 1941. Work remaining consists of 
completing master plan, which is 10 percent complete. 
(d) Lytle and Cajon Creeks channel improvements: 
Existing project was completed in 1948 and turned 
over to local interests for maintenance in September 
1949. No work remains. (e) Prado Reservoir: Dam was 
completed in May 1941. Work remaining consists of 
completing reservoir-regulation manual and master 
plan, which is 30 percent complete. (f) San Antonio 
Reservoir: Dam was completed in October 1956. Work 
remaining consists of preparation of master plan. (g) 
San Antonio and Chino Creeks channel: Project was 
completed in November 1960. No work remains. 
30. SANTA PAULA CREEK CHANNEL 
IMPROVEMENT, SANTA CLARA 
RIVER BASIN, CALIF. 
Location. Site of improvement, a unit of Santa Clara 
River Basin project, is along lower Santa Paula Creek, 
a tributary of Santa Clara River, Ventura County, 
Calif. 
Existing project. Plan provides for a concrete channel, 
extending for about 3 miles along Santa Paula Creek 
from a point near mouth of Santa Paula Canyon to 
Santa Clara River. Plan also provides for stonerevetted 
levees at confluence of Santa Paula Creek and 
Santa Clara River. Approved estimated (1970) first 
cost is $2,960,000 ($2,820,000 Federal and $140,000 
non-Federal). Improvement was authorized by 1948 
Flood Control Act (H. Doc. 443, 80th Cong., 1st sess.). 
Local cooperation. Local interests must furnish rightsof-
way; assume responsibility for damage claims; 
provide cost of relocations of public utilities; and 
maintain improvement after completion. 
Operations and results during fiscal year. Continued 
preparation of plans and specifications. 
Condition at end of fiscal year. Work remaining consists 
of completing plans and specifications, which are about 
75 percent complete, and constructing the project. 
31. SWEETWATER RIVER, SWEETWATER 
RIVER BASIN, CALIF. 
Location. Lower Sweetwater River Valley, along 
Sweetwater River from Bonita Mesa Road to San 
Diego Bay, San Diego County, Calif. 
Existing project. Plan provides for about 3.4 miles of 
improved trapezoidal channel along Sweetwater River 
from Bonita Mesa Road to San Diego Bay as part of a 
combined flood control and highway project. Approved 
estimated (1970) first cost for project is $14,400, 
000 ($6,630,000 Federal and $7,770,000 non-Federal). 
Project was authorized by 1968 Flood Control Act (H. 
Doc. 148, 90th Cong., 1st sess.). 
Local cooperation. Local interests must provide lands, 
easements, and rights-of-way; perform construction, 
modification, or relocation of highways (including 
bridges), utilities, and irrigation and drainage facilities; 
maintain and operate works after completion; 
hold and save the United States free from damages due 
to construction of project; adjust water-rights claims 
resulting from construction of project; and prevent any 
obstruction or encroachment that would reduce the 
flood-carrying capacity of improved channel. 
Operations and results during fiscal year. Initiated 
preparation of project plan. 
Condition at end of fiscal year. Project plan is 10 percent 
complete. 
32. TIJUANA RIVER BASIN, CALIF. 
Location. In the coastal region of southern California 
and Mexico. 
Existing project. Plan provides for a concrete trapezoidal 
channel for Tijuana River from its connection 
at international boundary with a similar flood control 
channel to be constructed by Government of Mexico, 
thence along United States side of boundary and along 
base of bluffs skirting south side of Tijuana River 
Valley to Pacific Ocean; a gated diversion outlet for 
water spreading, with a channel to a s ettling basin; two 
new bridges; relocation of utilities and roads; inlets for 
side drainage; and two short jetties at Pacific Ocean, 
all to be designed and constructed in cooperation with 
United States Section of International Boundary and 
Water Commission. Latest approved estimated (1966) 
first cost (as authorized) for project is $12,600,000, all 
1003

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Federal. Project was authorized by Public Law 640, 
89th Congress, second session, October 10, 1966. 
Local cooperation. Provide lands, easements, and 
rights-of-way; hold and save the United States free 
from damages due to construction works; maintain and 
operate works after completion; accomplish construction 
or relocations of highways, roads, bridges, 
utilities, and storm drains; prevent encroachment on 
improved channels that would reduce their floodcarrying 
capacities; and contribute 17.8 percent of 
construction costs, presently estimated to be $2,250,000 
apportioned share to be borne due to land enhancement 
benefits. 
Operations and results during fiscal year. Continued 
preparation of project plan. 
Condition at end of fiscal year. Project plan is 66 percent 
complete. 
33. WHITEWATER RIVER BASIN, CALIF. 
33A. CHINO CANYON IMPROVEMENTS, 
PALM SPRINGS 
Location. On Chino Canyon alluvial fan at Palm 
Springs, Calif., Riverside County, which is about 54 
miles east of City of Riverside and about 110 miles east 
of City of Los Angeles. 
Existing project. Proposed project would consist of 
about 3.1 miles of setback levee and about 1.8 miles of 
channel improvement across Chino Canyon alluvial 
cone and along right bank of Whitewater River; a 
berm; and directional groins. Latest approved estimated 
(1969) first cost for project is $1,276,500 ($946, 
500 Federal and $330,000 non-Federal). Existing 
project approved by Chief of Engineers, September 3, 
1968, under provisions of section 205, 1948 Flood 
Control Act, as amended. 
Local cooperation. Local interests must provide lands, 
easements, and rights-of-way; hold and save the 
United States free from damages due to construction 
works; maintain and operate works after completion; 
prevent encroachment on improved levee and channel 
that would impair project operations or its physical 
integrity; contribute 1.07 percent of construction costs, 
presently estimated to be $10,000, apportioned share to 
be borne due to land enhancement benefits; and pay 
costs in excess of Federal limitation. Local interests 
supplied assurances. 
Operations and results during fiscal year. Continued 
preparation of plans and specifications. 
Condition at end of fiscal year. Plans and specifications 
are about 98 percent complete. 
33B. TAHQUITZ CREEK 
Location. In Riverside County, city limits of Palm 
Springs, Calif., and about 90 miles east of Los Angeles, 
Calif. 
Existing project. Plan provides for a debris basin just 
below mouth of Tahquitz Canyon and a trapezoidal 
channel 3.5 miles long from debris basin to confluence 
of Tahquitz Creek and Palm Canyon Wash. Approved 
estimated (1970) first cost is $7,134,000 ($5,230,000 
Federal and $1,904,000 non-Federal). Project was 
authorized by 1965 Flood Control Act (H. Doc. 223, 
89th Cong., 1st sess.). 
Local cooperation. Local interests must provide lands 
and rights-of-way; perform construction or relocation 
of highways, roads, bridges, and utilities; hold United 
States free from damages; construct closure to integrate 
the proposed Tahquitz Creek improvement with 
existing levees on Palm Canyon Wash; maintain and 
operate completed works; prevent any encroachment 
that would reduce flood-carrying capacities of debris 
basin and improved channel, and contribute 12.9 
percent of the construction cost. 
Operations and results during fiscal year. Continued 
preparation of project plan. Continued preparation of 
plans and specifications. 
Condition at end of fiscal year. Project plan is about 99 
percent complete. Plans and specifications are about 70 
percent complete. 
34. WINSLOW (TRIBUTARIES OF LITTLE 
COLORADO RIVER), LITTLE 
COLORADO RIVER BASIN, ARIZ. 
Location. On tributaries of Little Colorado River at 
Winslow, Ariz. 
Existing project. Plan provides for two units of 
improvement. The first unit (Ruby Wash diversion 
levee) will be an earthen levee with a stone facing and 
will extend generally eastward for about 5.5 miles from 
high ground near southwest corner of airport to Little 
Colorado River south of the Atcheson, Topeka and 
Santa Fe railroad bridge. Flows in Ruby Wash and all 
other streams crossing the alinement of the levee will be 
intercepted and diverted to Little Colorado River. 
Levee will control a standard project flood ranging 
from 8,500 cubic feet per second at the upper end to 23, 
000 cubic feet per second at Little Colorado River. The 
second unit (Ice House Wash channel improvement) 
will extend generally northward through City of 
Winslow for about 2 miles from the Atcheson, Topeka 
and Santa Fe railroad tracks to a point near northern 
city limits. Improvement will be partly a rectangular 
reinforced-concrete channel, partly a leveed trapezoidal 
channel, and partly an excavated pilot 
channel. Improvement will accommodate a flood of 2, 
200 cubic feet per second, which is larger than any 
known flood of record. Approved estimated (1970) first 
cost is $4,380,000 ($3,640,000 Federal and $740,000 
non-Federal). Project was authorized by 1965 Flood 
Control Act (S. Doc. 63, 88th Cong., 2d sess.). 
Local cooperation. Local interests must provide lands 
and rights-of-way; pay for highway and utility relocations; 
hold United States free from damages; 
1004

LOS ANGELES, CALIF., DISTRICT 
maintain and operate works after completion; and 
prevent any encroachment upon improved channel or 
within restricted area upstream from diversion levee 
that would reduce flood-carrying capacities. 
Operations and results during fiscal year. Completed 
preparation of plans and specifications for first unit 
(Ruby Wash diversion levee). Initiated construction of 
first unit. 
Condition at end offiscalyear. Construction of first unit is 
about 1 percent complete. 
35. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspection costs for fiscal year from regular funds for 
maintenance were $75,430. (See table 33-J on inspection 
of completed flood control projects.) 
36. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with section 7, Flood Control Act of 
1944, studies of reservoir operations for flood control 
were conducted; and preparation of regulations for the 
use of storage allocated for flood control was continued 
for the following Bureau of Reclamation projects: 
Hoover Dam and Twitchell Dam. Costs for fiscal year 
from regular funds for maintenance were $3,926. 
36. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with section 7, Flood Control Act of 
1944, studies of reservoir operations for flood control 
were conducted; and preparation of regulations for the 
use of storage allocated for flood control was continued 
for the following Bureau of Reclamation projects: 
Hoover Dam and Twitchell Dam. Costs for fiscal year 
from regular funds for maintenance were $3,926. 
37. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 33K. 
38. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 
80-858, as amended (preauthorization) 
See table 33-L on flood control work under special 
authorization. 
Emergencyf lood control activities-repairf,l ood fighting, and 
rescue work (Public Law 99, 84th Cong., and antecedent 
legislation) 
Federal cost for fiscal year was $8,537,664, of which 
$25,303 were for advance preparation; $2,055,173 
were for flood emergency operations; and $6,457,188 
were for rehabilitation. 
Emergency bank protection (sec. 14 of 1946 Flood Control 
Act, Public Law 526, 79th Cong.) 
Federal cost for fiscal year was $833 for Santa Cruz 
River, Tubac, Ariz. 
39. SURVEYS 
Fiscal year cost was $1,198,730 regular funds, of 
which $242,278 were for navigation studies; $65,897 
were for beach erosion control studies; $836,669 were 
for flood control studies; $28,691 were for special 
studies involving coordination with other agencies; and 
$25,195 were for comprehensive basin studies 
(comprising $11,989 for California Region, $1,184 for 
Great Basin Region, and $12,022 for Lower Colorado 
Region). In addition, $89,653 Bureau of Reclamation 
funds were spent for Santa Cruz River, Ariz., flood 
control study. 
40. COLLECTION AND STUDY OF BASIC 
DATA 
Fiscal year cost for flood plain information studies 
was $207,990 regular funds, comprising $30,378 for 
San Juan Creek, Orange County, Calif.; $20,350 for 
San Jacinto River, Riverside County, Calif.; $120 for 
Victorville area, San Bernardino County, Calif.; $11, 
225 for Rose Canyon and San Clemente Wash and $32 
for Sweetwater River, both in San Diego County, 
Calif.; $2,601 for Lompoc Valley, Santa Barbara 
County, Calif.; $14,135 for Santa Paula-Fillmore area 
and $17,972 for Simi Valley, both in Ventura County, 
Calif.; $7 for upper Las Vegas Wash, Clark County, 
Nev.; $48,862 for technical services, including $2,862 
for Black Creek Reservoir, near Lupton, Apache 
County, Ariz., and $2,870 for Santa Cruz River, Santa 
Cruz County, Ariz.; $2,509 for comprehensive flood 
damage prevention planning, comprising $296 for 
Day, East Etiwanda, and San Sevaine Creeks, Calif., 
and $2,213 for all streams in Santa Barbara County, 
Calif., draining south of the Santa Ynez Mountains 
into the Pacific Ocean; and $59,799 for flood plain 
management. Fiscal year costs for research and data 
collection in connection with beach erosion control 
studies were $11,338 required contributed funds and 
$11,338 from funds supplied by Coastal Engineering 
Research Center. (See table 33-M on completed flood 
plain information studies.) 
41. RESEARCH AND DEVELOPMENT 
Fiscal year costs were $5,090 for hydrologic studies. 
1005 
451-584 0-72-64

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 33-A 
See 
Section 
in Text Project 
1. Channel Islands 
Harbor, Calif. 
2. Dana Point Harbor, 
Calif. (Regular 
Funds) 
(Required Contrib. 
Funds) 
3. Marina del Rey, 
Los Angeles County, 
Calif. 
4. Morro Bay Harbor, 
Calif. 
5. Oceanside Harbor, 
Calif. (Regular 
Funds) 
(Other Contrib. 
Funds) 
6. Port Hueneme, 
Calif. (Advanced 
Funds) 
7. Port San Luis, 
Calif. 
8. San Diego Harbor, 
Calif. 
9. San Diego River 
and Mission Bay, 
Calif. 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
--- 
Funding 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Advanced 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
705,135 
857,343 
1,550,000 
1,811,752 
1,700,000 
1,885,806 
6,520 
6,520 
228,773 
25,502 
207,530 198,102 
76,853 348,662 
- 490,000 
- 377,924 
123,000 
95,473 
1,080 
1,080 
6,089 
7,358 
155,815 
35,538 
2,020 
2,020 
115,000 
145,326 
1,660 
1,660 
3,031 
3,263 
-35,000 
93,069 
5,310 
5,310 
209,700 
57,671 
1,200,000 
2,011,402 
2,100,000 
1,922,874 
184 
1,015 
6,810 
6,810 
16,480 
13,615 
-4,082 
899,169 
9,015 
434,000 
342,176 
358,139 
236,300 
7,146 
57,200 
260,972 
186,214 
68,405 
7,226 
106,774 
15,000 
43,215 
1,660 
1,660 
79,117 
8,856 
146,000 
64,643 
2,800 
2,800 
102,115 
994,936 
12,455 
825 
825 
10,497 
2,426 
231,580 
12,195 
13,490 
23,856 
184,710 
5,998 
20,000 
6,361 
4,706 
175 
175 
131,923 
158,317 
650,000 
59,285 
5,115 
5,115 
1006 
$5,123,3451 5,123,345 
3,597,6152 
3,596,325 
4,417,0003 
4,315,282 
8254 
8254 
4,435,000 
4,311,700 
4,238,7525 
4,238,7525 
257,4546 
257,4546 
2,612,0937 
2,612,093 
2,336,1478 
2,333,228 
2,128,411 
2,128,411 
900,7029 
900,7029 
497,226 
490,696 
20,000 
6,361 
901,41710 
880,39410 
64,53911 
64,53911 
9,419,10512 
9,419,105 
892,08313 
848,36013 
10,784,88114 
10,107,85314 
25,04015 
25,04015

TABLE 33-A (Cont'd) 
LOS ANGELES, CALIF., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
10. Santa Barbara 
Harbor, Calif. 
11. Ventura Marina, 
Calif. (Regular 
Funds) 
(Required Contrib. 
Funds) 
(Advanced 
Funds) 
14. Coast of California, 
Point Mugu to San 
Pedro Breakwater, 
Calif. (Regular 
Funds) 
(Required Contrib. 
Funds) 
(Advanced Funds) 
15. San Diego (Sunset 
Cliffs), Calif. 
(Required Contrib. 
Funds) 
(Advanced Funds) 
16. San Gabriel River 
to Newport Bay 
(Surfside-Sunset and 
Newport Beach), 
Orange County, 
Calif. (Regular 
Funds) 
(Required Contrib. 
Funds) 
(Advanced Funds) 
20. Alamo Reservoir, 
Bill Williams 
River, Ariz. 
21A. Gila River 
Basin, Ariz., 
Indian Bend Wash. 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Advanced 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Advanced 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Advanced 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Advanced 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
$ 42,000 $ - 
74,018 3,590 
30,000 
30,000 
30,000 
30,000 
- 
30,000 
30,000 
924 
30,000 
30,000 
185,200 292,050 
13,164 218,813 
50,000 
32,121 
50,000 
35,461 
-90,963 1,150,000 
-53 419,515 
-143,400 1,150,000 
17,757 462,598 
379,733 
126,000 
27,997 
126,000 
28,500 
900,000 
900,000 
27,970 
427,105 -853,806 
20,000 
15,961 
20,000 
15,571 
276,000 804,000 
276,000 687,343 
21,146 
-1,317,000 
22,081 
231,000 
153,073 
198,000 
139,492 
469,000 272,000 
304,459 -24,607 
2,530,000 3,766,798 472,650 
2,985,265 3,322,390 856,005 
156,609 
-356,725 
-55,000 
142,008 
83,000 119,259 
80,140 121,476 
50,000 
15,733 
-2,420 
10,038 
1007 
$ 172,00016 
170,94416 
1,115,04617 
1,115,046 
477,25018 
231,977 
176,000 
60,118 
176,000 
63,961 
1,095,837 
1,095,837 
1,395,837 
1,072,808 
1,200,000 
76,379 
20,000 
15,961 
20,000 
15,571 
2,397,000 
2,280,343 
1,141,000 
1,125,877 
871,000 
2,401 
15,704,360 
15,626,224 
202,259 
201,616 
47,580 
25,771

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 33-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
21B. Gila River Basin, New Work: 
Ariz., Lower Gila Approp. 
River L and C Cost 
Improvements (Gila 
River and tributaries 
Downstream from 
Painted Rock 
Reservoir) 
21C. Middle Gila River New Work: 
Channel improvements, Approp. 
upper end of Safford Cost 
Valley to Buttes 
Reservoir site 
(Camelsback Reservoir 
to Salt River) 
21D. Gila River Basin, New Work: 
Ariz., Painted Approp. 
Rock Reservoir (Gila Cost 
River) Maint_: 
21E. Gila River Basin, 
Ariz., Phoenix, 
Ariz., and vicinity 
(including New 
River) 
21F. Gila River Basin, 
Ariz., Santa Rosa 
Wash (Tat Momolikot 
Dam and St. Clair 
Reservoir) 
21G. Gila River Basin, 
Ariz., Whitlow 
Ranch Reservoir, 
Queen Creek. 
22. Los Angeles County 
Drainage Area, 
Calif. (Regular 
Funds) 
(Other Contrib. 
Funds) 
23. Lytle and Warm 
Creeks, Santa Ana 
River Basin, Calif. 
24A. Mojave River Basin, 
Calif., Mojave 
River Reservoir 
(Regular Funds) 
(Other Contrib. 
Funds) 
24B. Mojave River Basin, 
Calif., Oro Grande 
Wash Channel 
Improvements (Regular 
Funds) 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
$-20,000 $-50,000 $-10,000 $ 844,000 
12,575 9,937 3,626 365,522 
2,596 
130,000 
62,884 
82,300 
56,037 
1,155 
-19,066 
69,113 
111,621 
69,225 
- 125,000 
1,848 79,581 
3,500 
3,730 
49,700 
122,022 
629 
65,349 
66,336 
100,000 965,000 
19,470 452,177 
150,000 
88,905 
531,000 
380,284 
27,000 
189,186 
-341 
- 
$1,345,600 
801,976 
352,400 
302,100 
19,325,71319 
19,325,71319 
531,243 
528,986 
1,065,000 
471,647 
708,000 
658,375 
1,867,963 
1,867,963 
8,200 5,759 14,250 8,926 76,004 
8,849 6,553 14,084 6,268 73,180 
14,200,000 12,250,000 2,370,000 130,000 352,524,58321 
14,824,979 12,973,503 2,528,343 166,709 352,447,925 
675,000 
716,232 
2,413,400 
1,685,856 
100,000 
25,892 
460,386 834,950 
618,680 671,173 
2,049,894 23,510 
350,000 437,000 
220,464 462,133 
871,278 
801,584 
-67 
2,195 
2,420 
178,124 
600,000 1,030,000 1,000,000 4,078,000 
306,514 1,368,491 1,113,280 4,083,881 
250,000 
75,000 
37,854 
- 36,300 
19,274 246,000 
66,600 785,060 
114,401 788,713 
19,000 
8,270,95621 
8,029,729 
36,901,93922 
36,624,07 2 
889,420 
886,613 
7,657,800 
7,623,163 
286,300 
284,274 
1,000,000 
32 1,000,000 
1008

TABLE 33-A (Cont'd) 
LOS ANGELES, CALIF., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
(Required Contrib. New Work: 
Funds) Contrib. 
Cost 
(Other Contrib. New Work: 
Funds) Contrib. 
Cost 
25. Needles, San New Work: 
Bernardino County, Approp. 
Calif. Cost 
26. Pine and Mathews New Work: 
Canyons Reservoirs, Approp. 
Colorado River Cost 
Basin, Nev. Maint.: 
Approp. 
Cost 
27. Rose Creek Channel New Work: 
Improvements, San Approp. 
Diego, Calif. Cost 
(Regular Funds) 
(Required Contrib. New Work: 
Funds) Contrib. 
Cost 
(Other Contrib. New Work: 
Funds) Contrib. 
Cost 
28. San Diego River New Work: 
(Mission Valley), Approp. 
San Diego River Cost 
Basin, Calif. 
29. Santa Ana River New Work: 
Basin (and Orange Approp. 
County), Calif. Cost 
Maint.: 
Approp. 
Cost 
30. Santa Paula Creek New Work: 
Channel Improvement, Approp. 
Santa Clara River Cost 
Basin, Calif. 
31. Sweetwater River, New Work: 
Sweetwater River Approp. 
Basin, Calif. Cost 
32. Tijuana River New Work: 
Basin, Calif. Approp. 
Cost 
33A. Whitewater River New Work: 
Basin, Calif. Approp. 
Chino Canyon Cost 
Improvements, Palm 
Springs. 
33B. Whitewater River New Work: 
Basin, Calif., Approp. 
Tahquitz Creek Cost 
34. Winslow (Tributaries New Work: 
of Little Colorado Approp. 
River), Little Cost 
Colorado River Basin, 
Ariz. 
$ 509,000 $ 62,000 $ - 
20,000 459,873 39,880 
72,000 
25,590 
14,300 
18,386 
51,000 
5,582 
178,000 
6,990 
-4,600 
33,752 
9,920 
10,562 
24,000 
74,920 
157,204 
17,000 
16,104 
21,300 
20,318 
20,000 
18,716 
20,416 
19,333 
229,940 634,280 
21,287 843,655 
226,000 25,000 
- 229,874 
154,000 733 
154,733 
267,000 330,000 
65,127 129,248 315,393 
585 
-4,238 
271,200 284,714 
273,689 286,971 
85,000 
59,071 
5,000 
666 
56,438 
5,118 
100,000 200,000 
15,772 138,615 
100,000 170,000 
51,074 109,615 
409,600 408,246 
307,376 467,371 
5,000 
2,797 
375,000 
149,447 
69,000 
47,299 
14,000 
125,403 
180,000 
128,352 
35,000 
24,127 
150,000 
45,014 
54,000 
129,014 
12,551 
25,173 
-20,000 
63,905 
$ 571,000 
519,753 
178,000 
164,194 
111,400 
101,151 
1,401,248 
1,401,248 
147,455 
145,367 
1,000,000 
998,938 
251,000 
229,874 
154,733 
154,733 
67 2,000 
519,641 
42,073,9072 3,24 
42,073,90723,24 
3,755,03323, 
25 
3,706,91423,25 
200,00026 
184,12326 
150,000 
45,014 
429,000 
278,461 
114,166 
104,484 
314,000 
304,963 
430,000 
352,946 
1009

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COST AND FINANCIAL STATEMENT 
1. Excludes $1,361,668 Navy funds, Coast Guard costs, and 
$210,748 other contributed funds. 
2. Includes $1,778 for reconnaissance and condition 
surveys. Excludes $855,109 Navy funds. 
3. Excludes Coast Guard costs. 
4. Includes $825 for reconnaissance and condition surveys. 
5. Excludes $4,238,752 required contributed funds, 
$1,843,146 other contributed funds, and Coast Guard costs. 
6. Includes $26,775 for reconnaissance and condition 
surveys. 
7. Navy funds. 
8. Includes $96,805 for reconnaissance and condition 
surveys since FY 1958 and $307,945 Navy funds. 
9. Includes $19,030 for reconnaissance and condition 
surveys. Excludes $683,357 Navy funds. 
10. Includes $568,417 for new work prior to modification by 
1965 River and Harbor Act. Excludes Coast Guard costs. 
11. Includes $54,715 for maintenance for project prior to 
modification by 1965 River and Harbor Act and $9,824 for 
reconnaissance and condition surveys. 
12. Includes $154,704 for new work for previous projects; 
$86,352 public works funds; and $1,226,793 emergency relief 
funds. Excludes $4,441 other contributed funds for betterments 
desired by local interests; $254,795 Navy funds for dredging 
entrance channel in FY 1961 to depth of 42 feet mean lower 
low water (or 2 feet below project depth); and Coast Guard 
costs. 
13. Includes $59,904 for maintenance for previous projects 
and $69,644 for reconnaissance and condition surveys since FY 
1958. In addition, includes $144 for retroactive pay increase 
shown in "cost" figure only, as reported in 1958 Annual Report, 
page 1430. 
14. Excludes $557,832 other contributed funds. Includes 
$2,610,000 regular funds and excludes $2,910,000 required 
contributed funds, both for flood control improvements. 
15. Includes $25,040 for reconnaissance and condition 
surveys. 
16. Excludes Coast Guard costs. 
17. Includes $29,198 public works funds, and $11,000 
working funds for work performed in addition to existing 
project. Excludes $462,986 other contributed funds spent by 
the Corps for maintenance-dredging betterments desired by local 
interests. 
18. Includes $6,885 for reconnaissance and condition 
surveys. 
19. Includes $7,400 Code 710 funds. 
20. Includes $3,758 Code 710 funds. 
21. Includes $11,008,935 emergency relief funds for new 
work. Excludes Code 710 funds, $16,726,888 emergency relief 
funds spent by Corps in connection with emergency relief 
(previous) project, and $107,939 for minor rehabilitation. 
22. Non-Federal funds spent by the Federal Government to 
June 30, 1970, for replacements required as part of local 
cooperation and betterments desired by local interests. Excludes 
$4,238,000 other contributed funds spent by the Corps in 
connection with emergency relief (previous) project. 
23. Comprises funds for Brea, Fullerton, Prado, and San 
Antonio Reservoirs, Carbon Canyon Reservoir and channel, 
Lytle and Cajon Creeks channel improvements, and San Antonio 
and Chino Creeks channel (active units). 
24. Includes $5,000 working funds for San Antonio 
Reservoir; $67,361 for San Juan Reservoir (inactive unit) (also 
reported under "Other Authorized Flood Control Projects"); 
and $85,310 undistributed funds. Excludes other contributed 
funds spent by the Corps as follows: $124,105 for water 
conservation betterments desired by local interests at Prado 
Reservoir; $8,500 for betterments desired by local interests at 
San Antonio Reservoir; $234,709 for betterments desired by 
local interests on San Antonio and Chino Creeks channel; and 
$601,762 for required items of local cooperation on Lytle and 
Cajon Creeks channel improvements. Excludes Code 710 funds. 
Excludes $290,000 spent direct by local interests on San 
Antonio and Chino Creeks channel for local cooperation items 
not required. 
25. Excludes maintenance for Lytle and Cajon Creeks 
channel improvements, which are operated and maintained by 
local interests. 
26. Excludes non-Federal costs of $295,000 for local 
cooperation items not required. 
1010 
TABLE 33-A (Cont'd)

LOS ANGELES, CALIF., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 3, 1875 
Sept. 19, 1890 
June 25, 1910 
Mar. 4, 1913 
July 27, 1916 
Aug. 8, 1917 
Aug. 8, 1917 
Sept. 22, 1922 
Mar. 3, 1925 
July 3, 1930 
Aug. 30, 19351 
Aug. 26, 1937 
Oct. 17, 1940 
Mar. 2, 1945 
Aug. 13, 1968 
Aug. 30, 1935 
Mar. 2, 1945 
Oct. 23, 1962 
June 22, 1936 
May 15, 1937 
June 28, 1938 
Aug. 18, 1941 
SANTA BARBARA HARBOR, CALIF. (See Section 10 of Text) 
Maintenance dredging present depths into harbor formed by 
breakwater constructed by local interests. 
Permits maintenance by means of a fixed sand-intercepting 
plant to be provided and operated by and at expense of 
local interests. United States to contribute to operating expense 
an amount not to exceed $ 30,000 annually, whenever 
funds are allotted therefor, funds thus contributed to be reduced 
by actual cost of harbor maintenance if and when intercepting 
plant has been installed. 
Modification of existing project. 
LOS ANGELES COUNTY DRAINAGE AREA, CALIF. (See Section 22 of 
Text). 
Reservoirs and flood channels for flood control and related 
purposes at an estimated construction cost not to exceed $70 
million. 
Added flood channels on Ballona Creek and tributaries to 
project. 
Provision of lands, easements, and rights-of-way and relocations 
by Federal Government instead of by local interests. (Resultant 
additional cost to the United States $12,541,000.) 
Project extended to include additional flood control reservoirs, 
flood control channels, and debris basins for flood control 
and related purposes. Also authorized to be appropriated $25 
million for further accomplishment of plan. 
1011 
TABLE 33-B 
SAN DIEGO HARBOR, CALIF. (See Section 8 of Text) 
Diversion dike 
Jetty on Zuniga Shoal 
Dredge channel through outer bar 30 feet deep and 600 feet wide, 
and a channel through middle ground to 30 feet deep. 
Dredge channel through outer bar 570 feet wide and 35 feet deep, 
and a channel through middle ground 32 feet deep. 
Widen approach (area B) to San Diego municipal pier by dredging 
area C (north of area B). 
Dredging area A (south of area B) 
Dredge 35-foot channel through Middle Ground. 
Dredging areas D and E 
Widen approach (area C) to San Diego municipal pier 1 by 
dredging a portion of area F (north of area C). 
Deepen to 40 feet channel through outer bar; along south and 
north banks, main channel; dredge turning basin, widen area 
H, and dredge a channel to National City and Chula Vista. 
Widen bay channel to 2,200 feet with depth of 35 feet from 
the vicinity of Whalers Bight in lower bay to naval air 
station opposite turning basin. 
Dredging areas Q, Q-1, M, N, and O 
Dredge a seaplane basin (area S) of about 3,000 acres, 10 feet 
deep, and fill an area of about 110 acres adjacent to southern 
of basin. 
Dredge triangular approaches to 26- and 35-foot anchorages, 
area M. 
Deepen and extend existing navigation channels, delete uncompleted 
parts, and extend maintenance. 
Annual Report, 1873; p. 1142 
H. Ex. Doc. 177, 50th Cong., 
1st sess. (Annual Report, 1888; 
p. 2114) 
H. Doc. 961, 60th Cong., 1st sess. 
H. Doc. 1309, 62d Cong., 3d sess. 
H. Doc. 648, 64th Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 8, 64th Cong., 2d sess. 
H. Doc. 140, 65th Cong., 1st sess. 
H. Doc. 1000, 66th Cong., 3d sess. 
Rivers and Harbors Committee 
Doc. 2, 68th Cong., 1st sess. 
S. Doc. 81, 71st Cong., 2d sess. 
H. Doc. 223, 73d Cong., 2d sess. 
Rivers and Harbors Committee Doc. 
89, 74th Cong., 2d sess. 
H. Doc. 844, 76th Cong., 3d sess. 
H. Doc. 390, 77th Cong., 1st sess. 
H. Doc. 365, 90th Cong., 2d sess.2 
S. Committee Print, 73d Cong., 2d 
sess. 
H. Doc. 348, 77th Cong., 1st sess. 
H. Doc. 518, 87th Cong., 2d sess.2 
None 
None 
None 
H. Doc. 838, 76th Cong., 3d sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 33-B (Cont'd) 
Acts 
Dec. Z2, 1944 
July 24, 1946 
May 17, 1950 
Sept. 3, 1954 
July 3, 1958 
July 14, 1960 
Oct. 23, 1962 
Dec. 30, 1963 
June 18, 1965 
June 22, 1936 
June 28, 1938 
Aug. 18, 1941 
Dec. 22, 1944 
July 3, 1958 
AUTHORIZING LEGISLATION 
Work Authorized 
Authorized to be appropriated an additional $25 million for 
prosecution of comprehensive plan approved in Flood Control 
Act of Aug. 18, 1941. 
Authorized to be appropriated an additional $25 million for 
further prosecution of comprehensive plan. 
Rio Hondo channel improvement, Whittier Narrows Reservoir to 
Los Angeles River (in lieu of enlarging channel and bridges on 
San Gabriel River downstream from reservoir). Also authorized 
to be appropriated an additional $40 million for further 
prosecution of comprehensive plan. 
Authorized to be appropriated an additional $12,500,000 for 
further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $44 million for 
further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $32 million for 
further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $3,700,000 for 
further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $30 million for 
further prosecution of comprehensive plan. 
In addition to all previous authorizations, completion of improvements 
under the comprehensive plan for flood control in 
the Los Angeles River Basin at a presently estimated cost of 
$31 million for completion. 
Documents 
None 
None 
None 
None 
None 
None 
None 
None 
None 
SANTA ANA RIVER BASIN (AND ORANGE COUNTY), CALIF. (See Section 
29 of Text). 
Reservoirs and flood channels for flood control and related None 
purposes for protection of metropolitan area of Orange County, 
at an estimated construction cost not to exceed $13 million. 
San Antonio and Chino Creeks channel portion of improvement. H. Doc. 688, 75th Cong., 3d sess. 
Authorized to be appropriated $6,500,000 for initiation and 
partial accomplishment of plans for those creeks. Rescinded 
provisions of Flood Control Act of 1936, providing that local 
interests pay for relocations, lands, easements, and rightsof-
way. (Estimated resultant additional cost to United States, 
$3,500,000.) 
Authorized to be appropriated an additional $2,500,000 for None 
prosecution of projects approved in above flood control acts. 
Authorized to be appropriated an additional $10 million for H. Doc. 534, 78th Cong., 2d sess. 
prosecution of projects adopted in above-mentioned flood 
control acts, including projects on Lytle and Cajon Creeks for 
local flood protection at San Bernardino and Colton, Calif. 
Authorized to be appropriated an additional $8 million for None 
prosecution of projects approved in above-mentioned flood 
control acts. 
1. Included in the emergency relief program, May 28, 1935. 
2. Contains latest published map. 
1012

LOS ANGELES, CALIF., DISTRICT 
RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 12 of Text) 
TABLE 33-C 
Name of Project Date Survey Conducted 
Los Angeles and Long Beach Harbors, Calif. October, December 1969 
Newport Bay Harbor, Calif. January, February 1970 
Redondo Beach Harbor (King Harbor), Calif. October 1969, February 1970 
TABLE 33-D OTHER AUTHORIZED NAVIGATION PROJECTS 
(see Section 13 of Text) 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Los Angeles and Long Beach Harbors, Calif. 1965 34,626,7191 2,930,2452,3 
Newport Bay Harbor, Calif. 1958 796,8974 164,6155 
Redondo Beach Harbor (King Harbor), Calif. 1966 4,766,8986 29,788 
1. Includes $2,187,047 for new work for previous projects; 3. Includes $89,723 reconnaissance and survey costs since 
$1,593,667 public works funds; a credit of $33,050 for transfer FY 1958. 
of land at Reservation Point; and $996,792 emergency relief 4. Public Works Administration funds. Excludes $796,897 
funds. Excludes $1,672,575 other contributed funds spent by required contributed funds and $1,100 preauthorization costs. 
the Corps for new work betterments desired by local interests 5. Includes $38,372 reconnaissance and survey costs since 
and Federal funds spent by the Navy for new work in middle FY 1958. 
breakwater. Excludes Coast Guard costs. 6. Excludes Coast Guard costs. 
2. Includes $139,347 for maintenance for previous projects. 7. Includes $14,142 reconnaissance and survey costs since 
Excludes $87,120 other contributed funds spent by the Corps FY 1958. 
for maintenance betterments desired by local interests. 
TABLE 33-E INSPECTION OF COMPLETED BEACH EROSION CONTROL PROJECTS 
(See Section 17 of Text) 
Project Date 
San Gabriel River to Newport Bay (Surfside-Sunset and Newport Beach), Orange 
County, Calif. (part) 
Ventura-Pierpont area, Calif. (part) 
Anaheim Bay Harbor, Orange County, Calif. 
March and April 1970 
May 1970 
June 1970 
1013

TABLE 33-F 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
(See Section 18 of Text) 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Anaheim Bay Harbor, Orange County, Calif.L 1967 89,119 - 
Bird Rock area, La Jolla, San Diego County, 1967 25,8813 
Calif. 
Doheny Beach State Park, Calif. 1968 578,7174 
Imperial Beach, San Diego County, Calif. 1965 68,660 s 
Ocean Beach, San Diego County, Calif.6 1960 7,912 
Oceanside, San Diego County, Calif. 1966 1,368,482 - 
Ventura-Pierpont area, California 1969 714,2848 
1. The project authorized by the Act of Congress of October 
23, 1962 (H. Doc. 602, 87th Cong., 2d sess.), in lieu of part of 
the original Anaheim Bay Harbor project is covered under San 
Gabriel River to Newport Bay (Surfside-Sunset and Newport 
Beach), Orange County, Calif. 
2. Authorized by Chief of Engineers under authority of 
section 103, Public Law 87-874. 
3. Excludes $75,614 required contributed funds. 
4. Excludes $431,260 required contributed funds. 
5. Excludes $66,124 other contributed funds; $22,078 
required contributed funds; and $20 advanced funds. 
6. Plant in service 
7. Excludes $604,817 other contributed funds. 
8. Excludes $117,406 other contributed funds for beachnourishment 
betterments and $606,151 required contributed 
funds. Includes advanced funds. 
1014

LOS ANGELES, CALIF., DISTRICT 
TABLE 33-G LOS ANGELES COUNTY DRAINAGE AREA, CALIF.: 
ESTIMATED FIRST COSTS FOR ALL UNITS OF IMPROVEMENT UNDER EXISTING PROJECT 
(See Section 22 of Text) 
Latest Approved Estimated Cost 19701 
Project Units Federal Local2 Total 
UNITS IN $70 MILLION PROJECT 
Los Angeles River Basin: 
Compton Creek, Los Angeles River to Hopper Ave. storm drain $ 2,510,500 $ - $ 2,510,500 
Haines Canyon 524,300 - 524,300 
Hansen flood control reservoir 11,337,700 - 11,337,700 
Los Angeles River channel: 
Lankershim Blvd. to Stewart and Gray Rd. 42,105,200 - 42,105,200 
Los Angeles River channel, Long Beach Blvd. 34,200 - 34,200 
Sepulveda flood control reservoir 6,655,600 - 6,655,600 
Sycamore Wash 23,500 - 23,500 
Verdugo Wash, Concord St. to upper Canada Bridge 855,200 - 855,200 
San Gabriel River Basin: 
San Gabriel River channel: 
San Gabriel Canyon to Santa Fe flood control reservoir 2,023,300 - 2,023,300 
Approach channel to Santa Fe flood control reservoir 
(remedial work) 2,460,000 - 2,460,000 
Santa Fe flood control reservoir to Walnut Creek 32,300 - 32,300 
Santa Fe flood control reservoir 12,647,100 - 12,647,100 
Rio Hondo Basin: 
Alhambra Wash 1,108,800 - 1,108,800 
Ballona Creek Basin: 
Ballona Creek channel and jetties 1,432,000 - 1,432,000 
Subtotal 83,749,700 - 83,749,700 
UNITS OUTSIDE $70 MILLION PROJECT 
Los Angeles River Basin: 
Blanchard Canyon 658,000 450,000 1,108,000 
Blue Gum Canyon 541,000 229,000 770,000 
Burbank-Eastern system 7,149,400 1,875,000 9,024,400 
Burbank-Western system (lower) 1,278,800 262,000 1,540,800 
Burbank-Western system (upper) 4,929,800 2,930,000 7,859,800 
Caballero Creek 1,484,200 520,000 2,004,200 
Compton Creek: 
Los Angeles River to Hopper Ave. storm drain 149,000 - 149,000 
Hooper Ave. storm drain to Main St. 1,203,000 457,000 1,660,000 
Dead Horse Canyon and Royal Blvd. channel 813,000 403,000 1,216,000 
Lopez Canyon diversion 739,000 730,000 1,469,000 
Lopez flood control reservoir 729,000 - 729,000 
Los Angeles River channel: 
Owensmouth Ave. to Lankershim Blvd. 17,371,700 4,153,000 21,524,700 
Lankershim Blvd. to Stewart and Gray Rd. 9,140,900 - 9,140,900 
Stewart and Gray Rd. to Santa Ana Branch, Pacific Electric 
railway bridge 5,860,900 80,000 5,940,900 
Santa Ana Branch, Pacific Electric railway bridge to Pacific Ocean 22,068,900 10,938,000 33,006,900 
Pacoima Wash channel 3,178,100 1,293,000 4,471,100 
Tujunga Wash channel 7,359,400 2,557,000 9,916,400 
Verdugo Wash, upper Canada Bridge to debris basin 727,000 352,000 1,079,000 
Wilson Canyon and Mansfield St. channel 3,885,900 853,000 4,738,900 
1015

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 33-G (Cont'd) LOS ANGELES COUNTY DRAINAGE AREA, CALIF.: 
ESTIMATED FIRST COSTS FOR ALL UNITS OF IMPROVEMENT UNDER EXISTING PROJECT 
(See Section 22 of Text) 
Latest Approved Estimated Cost 19701 
Project Units Federal Local2 Total 
UNITS OUTSIDE $70 MILLION PROJECT (Cont'd) 
Los Angeles River Basin (Cont'd): 
Winmery Canyon $ 463,000 $ 226,000 $ 689,000 
San Gabriel River Basin: 
Coyote Creek (including North Fork) 19,066,000 7,792,000 26,858,000 
Emerald Wash and Live Oak Wash 1,889,000 1,173,000 3,062,000 
Marshall Creek 2,047,000 955,000 3,002,000 
San Gabriel River channel: 
Santa Fe flood control reservoir to Whitter Narrows flood 
control reservoir 5,748,800 1,673,000 7,421,800 
Whittier Narrows control reservoir to Pacific Ocean 18,308,600 3,939,000 22,247,600 
Thompson Creek and San Jose Wash (including San Jose Creek) 21,229,400 5,740,000 26,969,400 
Walnut Creek inlet channel 2,879,000 1,093,000 3,972,000 
Walnut Creek system 17,232,600 8,421,000 25,653,600 
Whittier Narrows flood control reservoir 32,254,000 38,000 32,292,000 
Rio Hondo Basin: 
Arcadia Wash system 5,062,500 1,867,000 6,929,500 
Eaton Wash 4,225,100 1,170,000 5,395,100 
Rio Hondo channel: 
Peck Rd. to Rosemead Blvd. (upper) 4,535,800 534,000 5,069,800 
Whittier Narrows flood control reservoir to Los Angeles 
River (lower) 8,040,900 2,509,000 10,549,900 
Rubio Canyon diversion 1,066,400 251,000 1,317,400 
Santa Anita Wash 3,035,800 571,000 3,606,800 
Sawpit Wash 2,348,600 721,000 3,069,600 
Sierra Madre Villa channel 868,400 362,000 1,230,400 
Sierra Madre Wash 1,091,400 178,000 1,269,400 
Ballona Creek Basin: 
Ballona Creek channel 699,000 - 699,000 
Benedict Canyon system 15,373,000 3,767,000 19,140,000 
Centinela Creek 4,150,000 4,730,000 8,880,000 
Sawtelle-Westwood system (including Sepulveda channel) 9,623,000 1,508,000 11,131,000 
Subtotal 270,504,300 77,300,000 347,804,300 
Grand total for comprehensive plan 354,254,000 77,300,000 431,554,000 
1. Excludes estimated cost for Code 710 funds on Hansen, 2. Approved by Los Angeles County Flood Control District 
Lopez, Santa Fe, Sepulveda, and Whittier Narrows flood control as of June 30, 1970, except for Walnut Creek system channel 
reservoirs and estimated cost for minor rehabilitation, estimate, which was increased by $81,000 to permit rounding of 
overall non-Federal estimate to three significant figures. 
1016

LOS ANGELES COUNTY DRAINAGE AREA, CALIF.: 
PROJECT COSTS TO JUNE 30, 1970 
(See Section 22 of Text) 
Non-Federal funds1 
Spent Spent 
Emergency Total Federal by Federal by local Total 
Units Regular funds relief funds funds Government interests Total all funds 
UNITS IN $70 MILLION PROJECT 
Los Angeles River Basin: 
Compton Creek, Los Angeles River to 
Hooper Ave. storm drain 
Haines Canyon 
Hansen flood control reservoir 
Los Angeles River channel: 
Lankershim Blvd. to Stewart and Gray Rd. 
Los Angeles River channel, Long Beach Blvd. 
Sepulveda flood control reservoir 
Sycamore Wash 
Verdugo Wash, Concord St. to upper Canada 
bridge 
San Gabriel River Basin: 
San Gabriel River channel: 
San Gabriel Canyon to Santa Fe flood 
control reservoir 
Santa Fe flood control reservoir to 
Walnut Creek 
Santa Fe flood control reservoir 
Rio Hondo Basin: 
Alhambra Wash 
Ballona Creek Basin: 
Ballona Creek channel and jetties 
Plant 
Surveys and engineering 
Distribution of insurance and surplus plant accounts 
Subtotal - new work 
Subtotal - maintenance 
Subtotal - all work ($70 million 
project) 
$ 1,600,340 
354,263 
11,330,204 
34,069,879 
13,678 
6,650,561 
8,835 
367,805 
1,900,514 
32,264 
12,636,949 
529,014 
771,068 
363,474 
-781,900 
69,846,948 
6,927,587 
$ 745,849 
233,954 
7,638,039 
20,566 
14,711 
362,557 
2,346,189 
588,217 
11,330,204 
41,707,918 
34,244 
6,650,561 
23,546 
730,362 
44,686 1,945,200 
- 32,264 
- 12,636,949 
580,437 1,109,451 
509,118 
217,755 
24,000 
617,263 
1,280,186 
217,755 
387,474 
-164,637 
11,008,935 80,855,883 
-- 6,927,587 
25,409 
-1,302 
155,121 - 
4,684 
72,201 - 
256,113 - 
76,774,535 11,008,935 87,783,470 256,113 
$ 25,409 
-1,302 
155,121 
2,371,598 
588,217 
11,330,204 
41,706,616 
34,244 
6,650,561 
23,546 
885,483 
1,945,200 
32,264 
- 12,636,949 
4,684 1,114,135 
72,201 
- 
1,352,387 
217,755 
387,474 
-164,637 
256,113 81,111,996 
- 6,927,587 
256,113 88,039,583 
TABLE 33-H 
0 
0O
rT
MMi 
V
H
yu

TABLE 33-H (Cont'd) LOS ANGELES COUNTY DRAINAGE AREA, CALIF.: 
PROJECTS COSTS TO JUNE 30, 1970 
(See Section 22 of Text) 
Non-Federal funds1 
Spent Spent 
Emergency Total Federal by Federal by local Total 
Units Regular funds relief funds funds Government 2 interests3 Total all funds 
UNITS OUTSIDE $70 MILLION PROJECT 
Los Angeles River Basin: 
Blanchard Canyon 
Blue Gum Canyon 
Burbank-Eastern system 
Burbank-Western system (lower) 
Burbank-Western system (upper) 
Caballero Creek 
Compton Creek: 
Los Angeles River to Hooper 
Ave. storm drain 
Hooper Ave. storm drain to Main St. 
Dead Horse Canyon and Royal Blvd. channel 
Lopez Canyon diversion 
Lopez flood control reservoir 
Los Angeles River channel: 
Owensmouth Ave. to Lankershim Blvd. 
Lankershim Blvd. to Stewart and Gray Rd. 
Stewart and Gray Rd. to Santa Ana Branch, 
Pacific Electric railway bridge 
Santa Ana Branch, Pacific Electric railway 
bridge to Pacific Ocean 4 
Pacoima Wash channel 
Tujunga Wash channel 
Verdugo Wash, upper Canada bridge to debris basin 
Wilson Canyon and Mansfield St. channel 
Winery Canyon 
San Gabriel River Basin: 
Coyote Creek (including North Fork) 
Emerald Wash and Live Oak Wash 
Marshall Creek 
San Gabriel River channel: 
Santa Fe flood control reservoir to 
Whittier Narrows flood control reservoir 
$ 754,165 
583,255 
7,149,291 
1,295,926 
4,911,988 
1,446,949 
149,033 
1,202,965 
727,464 
743,458 
729,056 
17,371,670 
9,090,403 
5,860,861 
22,009,913 
3,178,110 
7,359,357 
678,922 
3,917,506 
477,068 
18,676,977 
1,658,620 
2,576,475 
5,939,112 
$ 754,165 
583,255 
7,149,291 
1,295,926 
4,911,988 
1,446,949 
149,033 
1,202,965 
727,464 
743,458 
729,056 
- 17,371,670 
- 9,090,403 
5,860,861 
22,009,913 
3,178,110 
7,359,357 
678,922 
3,917,506 
477,068 
18,676,977 
1,658,620 
2,576,475 
5,939,112 
206,150 
45,051 
806,960 
781,354 
325,908 
362,937 
132,857 
192,673 
397,650 
203,149 
966,140 
262,500 
1,705,246 
395,692 
158,063 
69,643 
489,327 
$ 603,800 
248,200 
1,773,100 
262,500 
2,486,600 
721,600 
521,000 
202,500 
682,000 
$ 1,357,965 
831,455 
8,922,391 
1,558,426 
7,398,588 
2,168,549 
149,033 
1,723,965 
929,964 
1,425,458 
729,056 
4,410,884 1,760,116 6,171,000 23,542,670 
- - - 9,090,403 
327,371 
1,582,691 
903,238 
2,286,305 
51,903 
361,722 
26,745 
1,682,830 
269,826 
389,675 
16,429 
8,056,809 
512,562 
893,595 
305,697 
694,878 
200,655 
7,508,670 
967,274 
497,925 
343,800 6,204,661 
9,639,500 
1,415,800 
3,179,900 
357,600 
1,056,600 
227,400 
9,191,500 
1,237,100 
887,600 
31,649,413 
4,593,910 
10,539,257 
1,036,522 
4,974,106 
704,468 
27,868,477 
2,895,720 
3,464,075 
745,206 1,104,194 1,849,400 7,788,512 
yC 
yO 
0
H
0
zz 
0

TABLE 33-H (Cont'd) LOS ANGELES COUNTY DRAINAGE AREA, CALIF.: 
PROJECTS COSTS TO JUNE 30, 1970 
(See Section 22 of Text) 
Non-Federal funds1 
Spent Spent 
Emergency Total Federal by Federal by local Total 
Units Regular funds relief funds funds Government2 interests3 Total all funds 
UNITS OUTSIDE $70 MILLION PROJECT - Cont'd 
San Gabriel River channel (Cont'd): 
Whittier Narrows flood control reservoir to 
Pacific Ocean (including approach channel 
to Santa Fe flood control reservoir 
(remedial work)) 
Thompson Creek and San Jose Wash (including 
San Jose Creek) 
Walnut Creek inlet channel 
Walnut Creek system 
Whittier Narrows flood control reservoir 
Rio Hondo Basin: 
Arcadia Wash system 
Eaton Wash 
Rio Hondo channel: 
Peck Rd. to Rosemead Blvd. (upper) 
Whittier Narrows flood control reservoir to 
Los Angeles River (lower) 
Rubio Canyon diversion 
Santa Anita Wash 
Sawpit Wash 
Sierra Madre Villa channel 
Sierra Madre Wash 
Ballona Creek Basin: 
Ballona Creek channel 
Benedict Canyon system 
Centinela Creek 
Sawtelle-Westwood system (including 
Sepulveda channel) 
Subtotal - new work 
Subtotal - maintenance 
Subtotal - all work (outside $70 
million project) 
Total - new work 
Total - maintenance 
Grand Total - all work (inside 
and outside $70 
million project) 
$ 20,441,082 $ 
21,349,693 
2,869,424 
17,127,158 
32,254,311 
5,063,273 
4,225,068 
4,411,995 
8,164,705 
1,066,825 
3,045,713 
2,337,809 
846,442 
169,149 
600,582 
15,425,731 
4,083,771 
9,620,767 
271,592,042 
1,102,142 
272,694,184 
341,438,990 
8,029,729 
349,468,719 
- $ 20,441,082 $ 2,639,591 
21,349,693 
2,869,424 
17,127,158 
32,254,311 
2,355,410 
727,516 
4,277,539 
35,239 
941,509 $ 3,581,100 $ 24,022,182 
3,761,390 
554,384 
6,056,961 
3,061 
6,116,800 
1,281,900 
10,334,500 
38,300 
27,466,493 
4,151,324 
27,461,658 
32,292,611 
5,063,273 1,264,448 788,452 2,052,900 7,116,173 
- 4,225,068 932,388 419,212 1,351,600 5,576,668 
S4,411,995 970,312 525,888 1,496,200 5,908,195 
8,164,705 
1,066,825 
3,045,713 
2,337,809 
846,442 
169,149 
600,582 
15,425,731 
4,083,771 
9,620,767 
271,592,042 
1,102,142 
- 272,694,184 
11,008,935 352,447,925 
- 8,029,729 
1,429,176 
90,523 
412,879 
252,731 
4,368 
2,197,718 
1,696,998 
1,188,837 
36,367,959 
757,324 
161,677 
134,821 
487,469 
361,232 
239,100 
2,235,782 
2,884,302 
559,563 
48,038,341 
2,186,500 
252,200 
547,700 
740,200 
365,600 
239,100 
4,433,500 
4,581,300 
1,748,400 
84,406,300 
10,351,205 
1,319,025 
3,593,413 
3,078,009 
1,212,042 
408,249 
600,582 
19,859,231 
8,665,071 
11,369,167 
355,998,342 
1,102,142 
36,367,959 48,038,341 84,406,300 357,100,484 
36,624,072 48,038,341 84,662,413 437,110,338 
- - - 8,029,729 
11,008,935 360,477,654 36,624,072 48,038,341 84,662,413 445,140,067 
O
C 
r 
O
rzIIr 
C,

LOS ANGELES COUNTY DRAINAGE AREA, CALIF.: 
PROJECT COSTS TO JUNE 30, 1970 
(See Section 22 of Text) 
1. Includes $11,425,800 for betterments, some of which were constructed by 
local interests and some by Federal Government out of non-Federal funds deposited 
by local interests. 
2. Other contributed funds (non-Federal) spent by Federal Government for 
required items of local cooperation under terms of project authorization and 
betterments desired by local interests. 
3. Non-Federal funds spent by local interests for required items of local 
cooperation under terms of project authorization and betterments desired by local 
interests. Includes non-Federal funds of $277,935 on deposit with Federal 
Government on June 30, 1970, but not yet spent as of that date. 
4. Includes funds for permanent construction of Los Angeles River at Long Beach 
Blvd. 
Note: Does not include $107,939 for minor rehabilitation and does not include 
costs under Code 710. 
TABLE 33-H (Cont'd) 
C
C
O
0
x
0
z
zr 
c,) 
-4
V
O

LOS ANGELES, CALIF., DISTRICT 
TABLE 33-I SANTA ANA RIVER BASIN (AND ORANGE COUNTY), CALIF. 
LATEST APPROVED ESTIMATED FEDERAL FIRST COST FOR ALL UNITS 
(See Section 29 of Text) 
Estimated Cost 
Latest 
Revision 
Project Total Date 
ACTIVE UNIT1 
Completed: 
Brea Reservoir $ 1,189,0685 2 
Fullerton Reservoir 411,0765 2 
Lytle and Cajon Creeks channel im'provements 7,612,000 2 
Prado Reservoir 9,473,2735 2 
San Antonio and Chino Creeks channel 10,924,170 2 
San Antonio Reservoir 7,001,1763,5 2 
Completed Except for Minor Completion Items: 
Carbon Canyon Reservoir and channel 5,150,000s 1961 
INACTIVE UNITS4 
Aliso Creek Reservoir 340,000 1954 
San Juan Reservoir 5,960,000 1954 
Trabuco Reservoir 2,190,000 1954 
Villa Park Reservoir 2,270,000 1954 
1. For details, see section 29 of text. 4. For additional information, see "Other Authorized 
Flood Control Projects." 
2. Plant in service. 5. Not including estimated cost of Code 710 recreation at 
Brea, Fullerton, Prado, San Antonio, and Carbon Canyon Res- 
3. Includes $5,000 working funds. ervoirs. 
TABLE 33-J INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 35 of Text) 
Project Date 
Banning levee-San Gorgonio River, Whitewater River Basin, Calif. May 1970 
City Creek levee, Santa Ana River Basin, Calif. May 1970 
Devil, East Twin, and Warm Creeks channel improvements and Lytle Creek levee, Santa Ana 
River Basin, Calif. May 1970 
Los Angeles County drainage area, California, channels April and May 1970 
Lytle and Cajon Creeks channel improvements, Santa Ana River Basin 
(and Orange County), Calif. May 1970 
Mill Creek levees, Santa Ana River Basin, Calif. May 1970 
Oro Grande Wash channel improvements, Mojave River Basin, Calif. May 1970 
Riverside levees, Santa Ana River Basin, Calif. May 1970 
San Diego River channel and levees, San Diego River Basin, Calif. June 1970 
San Jacinto River levee and Bautista Creek channel, Santa Ana River Basin, Calif. May 1970 
Santa Clara River levee and channel improvements, Santa Clara River Basin, Calif. June 1970 
Santa Maria Valley levees, Santa Maria River Basin, Calif. June 1970 
Stewart Canyon debris basin and channel, Ventura River Basin, Calif. June 1970 
Tahchevah Creek detention reservoir and channel improvements, Whitewater River 
Basin, Calif. May 1970 
Ventura River levee, Ventura River Basin, Calif. June 1970 
1021 
451-584 0-72-65

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 37 of Text) 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
City Creek levee, San Bernardino County, 
Calif.1 
,2 
Cucamonga Creek, Santa Ana River Basin, Calif. 
Gila River Basin, Ariz.: 
Camelsback Reservoir (Gila River) 
Gila and Salt Rivers levee and channel 
improvements (deferred) 
Pinal Creek channel improvements (Globe) 
Tucson diversion channel2 
Hodges Reservoir, San Dieguito River Basin, 
Calif. (inactive) 
Holbrook levee, Little Colorado River, 
Colorado River Basin, Ariz.2 
Las Vegas tributaries, Colorado River Basin, 
Nev. (inactive) 
Quail Wash levee, Joshua Tree, San Bernardino 
County, Calif. 1 , 
Santa Ana River Basin, Calif.: 
Devil, East Twin, and Warm Creeks channel 
improvements and Lytle Creek levee. 2 
Mill Creek levees2 
Riverside levees 2 
San Jacinto River levee and Bautista Creek 
channel 2 
Santa Ana River Basin (and Orange County), 
Calif.: 
Aliso Creek Reservoir (inactive) 
San Juan Reservoir (inactive) 
Trabuco Reservoir (inactive) 
Villa Park Reservoir (inactive) 
Santa Clara River levee improvement, Santa Clara 
River Basin, Calif.2 
Santa Maria Valley levees, Santa Maria River 
Basin, Calif.2 
Ventura River Basin, Calif.: 
Stewart Canyon debris basin and channel 2 
Ventura River levee2 
Whitewater River Basin, Calif.: 
Banning levee-San Gorgonio River, Riverside 
County
1 
,2 
Tahchevah Creek detention reservoir and 
channel improvements2 
1969 
1963 
1966 
1968 
1967 
1958 
1950 
1964 
1962 
1961 
1959 
1962 
1950 
1961 
1966 
1964 
1950 
1966 
1967 
1. Authorized by Chief of Engineers under authority of 
section 205, Public Law 80-858, as amended. 
2. Completed. 
3. Excludes $371,058 other contributed funds. 
4. Advance planning only. 
5. Excludes $394,364 other contributed funds. 
6. Excludes $200,000 required contributed funds and 
$1,641,668 other contributed funds. 
$ 400,0003 
71,9564 
121,3744 
5,764,6255 
335,000 
295,191 
212,745 
7,753,9376 
617,8907 
2,104,478 
3,026,9748 
67,361 
2,126,672 
5,535,7349 
939,90810 
1,343,63811 
97,29412 
1,359,40613 
7. Excludes $35,830 other contributed funds. 
8. Excludes $327,723 other contributed funds. 
9. Excludes $106,364 other contributed funds. 
10. Excludes $179,148 other contributed funds. 
11. Excludes $17,006 other contributed funds. 
12. Inadvertently omitted in 1969 Annual Report when 
published. 
13. Excludes $70,448 required contributed funds. 
1022 
TABLE 33-K

LOS ANGELES, CALIF., DISTRICT 
TABLE 33-L FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
Flood Control Activities Pursuant To Section 205, P.L. 80-858, As Amended (Preauthorization) 
(See Section 38 of Text) 
Project Fiscal Year Costs 
Ridgecrest, Calif. $10,667 
Yucca Valley, Calif. 20,426 
TABLE 33-M COMPLETED FLOOD PLAIN INFORMATION STUDIES 
(See Section 40 of Text) 
Date Federal 
Location Requesting Agency Completed I Cost2 
Maricopa County, Ariz.: 
Indian Bend Wash 
Cave Creek 
Skunk Creek 
Wickenburg 
New River 
Agua Fria River 
Orange County, Calif.: 
Richfield Channel 
Laguna Canyon 
San Bernardino County, Calif.: 
Mojave River (vicinity of 
Barstow) 
Mojave River (vicinity of 
Victorville) 
San Diego County, Calif.: 
Los Penasquitos 
Spring Valley 
Las Chollas Creek 
Sweetwater River 
Santa Barbara County, Calif.: 
Santa Ynez River 
(Cachuma Dam to Buellton) 
Santa Ynez River 
(Lompoc to Pacific Ocean) 
Ventura County, Calif.: 
Santa Clara River 
(Saticoy to Pacific Ocean) 
Calleguas Creek (including Conejo 
Creek and Arroyo Santa Rosa), 
Somis to Pacific Ocean 
Clark County, Nev.: 
Lower Las Vegas Wash 
Flood Control District of Maricopa County 
Flood Control District of Maricopa County 
Flood Control District of Maricopa County 
Flood Control District of Maricopa County 
Flood Control District of Maricopa County 
Flood Control District of Maricopa County 
Flood Control District of Orange County 
Flood Control District of Orange County 
Flood Control District of San Bernardino 
County 
Flood Control District of San Bernardino 
County 
San Diego County 
Board of Supervisors 
Board of Supervisors 
San Diego County 
Santa Barbara County Flood Control and 
Water Conservation District 
Santa Barbara County Flood Control and 
Water Conservation District 
Ventura County Department of Public Works 
Ventura County Department of Public Works 
Flood Control District of Clark County and 
The Director of the Department of 
Conservation and Natural Resources of 
the State of Nevada 
Total 
1. Report supplied to requesting agency. 
2. Excluding costs for processing study applications. 
1023 
July 1964 
Dec. 1964 
Mar. 1965 
Feb. 1966 
Apr. 1967 
Apr. 1968 
Apr. 1968 
June 1969 
Jan. 1969 
June 1969 
Sep. 1967 
Oct. 1967 
Apr. 1968 
Apr. 1969 
Apr. 1969 
Apr. 1970 
Sep. 1968 
Dec. 1969 
Feb. 1968 
$ 47,000 
38,000 
24,000 
30,000 
29,000 
37,000 
8,000 
23,000 
35,700 
27,000 
44,014 
33,000 
21,601 
23,000 
29,999 
28,999 
19,400 
14,998 
50,015 
563,726

SAN FRANCISCO, CALIF., DISTRICT* 
This district comprises parts of southern Oregon and 
northern and western California embraced in drainage 
basins tributary to the Pacific Ocean from Oregon- 
California State line on the north to Cape San Martin, 
Calif., including basins tributary to the San Francisco 
Bay system west of the Benicia-Martinez Bridge. 
IMPROVEMENTS 
Navigation Page 
1. Crescent City Harbor, Calif................... 1025 
2. Humboldt Harbor and Bay, Calif. ....... 1026 
3. Monterey Harbor, Calif. .................... 1027 
4. Noyo River and Harbor, Calif. ......... 1027 
5. Oakland Harbor, Calif. ........................... 1028 
6. Redwood City Harbor, Calif .................. 1029 
7. Richmond Harbor, Calif. ..................... 1030 
8. San Francisco Harbor, Calif. ....... 1030 
9. San Francisco Harbor and Bay, Calif. 1031 
10. San Pablo Bay and Mare Island 
Strait, Calif . ...................... 1031 
11. San Rafael Creek, Calif ................. 1032 
12. Santa Cruz Harbor, Calif. ................... 1032 
13. Reconnaissance and condition surveys .. 1033 
14. Other authorized navigation projects .... 1033 
15. Navigation work under special 
authorization ................................. 1033 
16. Other authorized beach erosion control 
projects ........................ .............. 1033 
17. 
18. 
19. 
20. 
21. 
22. 
23. 
24. 
25. 
26. 
27. 
28. 
29. 
30. 
31. 
32. 
Flood Control Page 
Alameda Creek, Calif. ......... .......... 1033 
Corte Madera Creek, Calif ... ........... 1034 
Eel River, Calif. .................................. 1035 
Klamath River Basin, Calif. .................. 1035 
Mad River Basin, Calif. ...................... 1036 
Napa River Basin, Calif. ..................... 1036 
Pajaro River, Calif. ............................... 1037 
Redwood Creek, Humboldt County, 
Calif. ........................................ 1037 
Russian River Basin, Calif. ................. 1037 
Sonoma Creek, Calif. ............................ 1038 
Inspection of completed flood control 
projects ........................................ 1039 
Other authorized flood control projects 1039 
Flood control work under special 
authorization ......... ......................... 1039 
General Investigations 
Surveys ........... ........................... 1039 
Collection and study of basic data ....... 1039 
Research and development .................. 1039 
NAVIGATION 
1. CRESCENT CITY HARBOR, CALIF. 
Location Harbor is 17 miles south of Oregon State 
line, 125 miles south of Coos Bay, Oreg., 70 miles north 
of Humboldt Bay, Calif., and midway between San 
Francisco Bay and mouth of Columbia River. (See 
Coast and Geodetic Survey Chart 5895.) 
Existing project A rubblemound outer breakwater 
extending about 3,700 feet on a bearing of S. 27 degrees 
E.; from Battery Point, thence about 1,000 feet on a 
bearing of S. 80 degrees E.; for maintenance dredging 
of an outer harbor basin 1,800 feet long and 1,400 feet 
wide to 20 feet depth at mean lower low water, except 
in rock; a rubblemound sand barrier from Whaler 
Island to easterly shore and maintenance dredging at 
seaward end of sand barrier; an inner breakwater 
extending northwesterly about 1,200 feet from Whaler 
Island, thence westerly 300 feet to form a protected 
fish-boat harbor; for removal of pinnacle rock in fishboat 
harbor to 10-foot depth; and a T-shaped inner 
harbor basin 20 feet deep, 1,500 feet long extending 
along north side of Citizen's Dock for 325 feet, with a 
stem 1,000 feet long. All depths refer to mean lower low 
water. Range of tide between mean lower low water 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
1025

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
and mean higher high water is 6.9 feet; extreme range 
of tide is about 12.3 feet. Approved estimated cost of 
new work (1970) is $8,766,000 ($8,549,000 Federal cost 
(excludes Coast Guard cost) and $217,000 contributed 
by local interests). Major rehabilitation of outer 
breakwater cost $525,000. (See table 34-B for authorizing 
legislation.) 
Local cooperation Fully complied with for work 
performed. Estimated costs for all requirements of local 
cooperation for completed work, including required 
non-Federal contributions of $217,116 for new work 
and $27,884 for maintenance, were $300,000 (prices as 
of dates of compliance). Local interests must provide 
easements and rights-of-way and a suitable quarry or 
source of supply of royalty-free rock for maintenance of 
breakwater. Act of October 27, 1965, requires local 
interests provide and maintain 50-foot wide berthing 
areas or strips between Citizen's Dock and project 
basin and adjacent to Oil Terminals Co. faciliites, at 
depths commensurate with those provided in the basin 
by the United States; provide lands and rights-of-way, 
spoil-disposal areas and diking therefor for project 
construction and future maintenance and construction 
and maintenance of aids to navigation; and hold the 
United States free from property damages to wharves, 
buildings, and pipelines. Board of Commissioners of 
Crescent City Harbor District, by Resolution No. 209, 
March 2, 1965, furnished assurances of willingness and 
ability to comply. 
Terminal facilities Three piers, one of which is publicly 
owned and from which boats are fueled; one oil 
terminal; and a private mooring for barges discharging 
petroleum products to pipelines on inner breakwater. 
Facilities are considered adequate for existing commerce. 
Operations and results during fiscal year. Advance 
engineering and design initiated for work authorized 
by 1965 River and Harbor Act. 
Condition at end offiscalyear. Project is about 73 percent 
complete. Work remaining is 300-foot extension to 
inner breakwater and T-shaped inner harbor basin 20 
feet deep authorized by 1965 River and Harbor Act. 
Planning for this modification is about 8 percent 
complete. The 3,000-foot outer breakwater was completed 
in 1930, sand barrier in 1939, inner breakwater in 
1946, removal of pinnacle rock in 1951, and outer 
breakwater extension in 1957. Major rehabilitation of 
outer breakwater was completed in October 1964. 
2. HUMBOLDT HARBOR AND BAY, 
CALIF. 
Location. Humboldt Bay is a landlocked harbor on 
coast of California, 225 miles north of San Francisco 
Bay and 70 miles south of Crescent City Harbor. (See 
Coast and Geodetic Survey Chart 5832.) 
Previous projects. For details see pages 1982--84 of 
Annual Report for 1915, page 1673 of Annual Report 
for 1929, and page 1689 of Annual Report for 1938. 
Existing project. Two rubblemound jetties at 
entrance-north jetty about 4,500 feet long and south 
jetty 5,100 feet long, not including shore revetments; a 
bar and entrance channel 40 feet deep tapered from 1, 
600 feet wide at seaward mile 0.91 to 500 feet at 
seaward mile 0.18, thence 500 feet wide to mile 0.75, 
with easing of bend at mile 0.75; a North Bay Channel 
35 feet deep and 400 feet wide from mile 0.75 to 4.29; 
with widening of channel bends at mile 0.75 and 2.6; 
an anchorage area in the North Bay 35 feet deep, 1200 
feet wide and 1200 feet long; a channel 400 feet wide 
and 30 feet deep from mile 4.29 to 5.00, thence 26 feet 
deep to foot of N Street, Eureka; a channel 35 feet deep 
and 300 feet wide from mile 4.29 across Indian Island 
Shoal to Samoa, at mile 5.84; a channel 18 feet deep 
and 150 feet wide to Arcata wharf; and a channel 26 
feet deep and 300 feet wide to Fields Landing, with a 
turning basin 600 feet wide and 800 feet long off Fields 
Landing Wharf. All depths refer to mean lower low 
water. Tidal range between mean lower low water and 
mean higher high water is 6.4 feet at south jetty and 6.7 
feet at Eureka. Extreme range is 12.5 feet at south jetty 
and 12 feet at Eureka. Approved estimated cost for new 
work (1970), exclusive of amounts expended on 
previous projects, is $6,509,000, of which $6,414,000 is 
Federal cost (excludes Coast Guard costs) and $95,000 
contributed by local interests. (See table 34-B for 
authorizing legislation.) 
Local cooperation. Fully complied with for work 
performed. Estimated costs for all requirements of local 
cooperation for work performed, including required 
non-Federal contributions, were $1 million (prices as of 
dates of compliance). Local interests must furnish 
lands, easements, rights-of-way, and suitable spoildisposal 
areas for maintenance dredging. Act of August 
13, 1968 requires local interests provide and maintain 
adequate wharf and terminal facilities in the North 
Bay, Eureka and Samoa Channels, open to all on equal 
and reasonable terms for the storage, handling, and 
shipment of lumber and general commerce; provide 
and maintain, in berthing areas and local access 
channels serving terminals and wharves, depths commensurate 
with depths provided in related project 
channels; provide lands required for construction and 
subsequent maintenance of the project and for aids to 
navigation upon request of the Chief of Engineers; 
including suitable areas determined by the Chief of 
Engineers to be required in the g eneral public interest 
for disposal of spoil, and also necessary retaining dikes, 
bulkheads, and embankments therefor or the costs of 
such retaining works; hold and save the United States 
free from all claims for damages to wharves, piers, and 
other marine and submarine structures due to initial 
dredging work and subsequent maintenance dredging; 
and accomplish at local expense all alterations as may 
be required to sewer, water supply, drainage, cableways, 
and other utility facilities. Board of Supervisors 
of Humboldt County, by Resolution No. 66- 
1026

SAN FRANCISCO, CALIF., DISTRICT 
85, July 26, 1966, furnished assurances of willingness 
and ability to comply. 
Terminal facilities. There are 37 wharves and piers, 3 
of which are publicly owned; 4 oil terminals; 1 
privately owned submarine pipeline for petroleum 
products; 2 boat-building and repair plants; 1 boaticing 
plant; 6 small boat fueling stations; 2 small yacht 
and fishboat basins, 1 of which is publicly owned; and 
numerous log booms and small landings; exclusive of 
facilities owned by the United States. Facilities 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Engineering and design by hired labor, including 
dredging surveys of project channels, and U.S. hopper 
dredge Harding removed 370,000 cubic yards of shoaled 
material from the bar and entrance channel and 
65,000 cubic yards from Fields Landing Channel and 
turning basin, cost $335,599. Engineering and design 
by hired labor and continuing contract awarded for 
repair of north and south jetties, cost $127,870. 
Condition at end offiscalyear. Project is about 53 percent 
complete. Work remaining is deepening channels to 35 
feet, widenings, and construction of North Bay 
anchorage area as authorized by 1968 River and 
Harbor Act. North jetty was completed in 1925; south 
jetty in 1927; Arcata Channel in 1931; entrance 
channel, 30 feet deep and 50 feet wide, in 1935; Fields 
Landing Channel and turning basin and Eureka and 
Samoa Channels, to 26 feet deep, in 1939; entrance 
channel to 40 feet deep, and Eureka, Samoa, and 
North Bay Channels to 30 feet deep in 1954. Total cost 
of existing project to end of fiscal year was $16,491,530, 
of which $3,378,705 was for new work ($3,283,705 
regular funds and $95,000 contributed funds) and $13, 
112,825 regular funds for maintenance. 
3. MONTEREY HARBOR, CALIF. 
Location. About 100 miles south of San Francisco Bay, 
at south end of Monterey Bay, an indentation in coast 
of California. (See Coast and Geodetic Survey Chart 
5403.) 
Previous projects. Adopted by River and Harbor Act of 
1912. No work was done nor expenditures made. 
Existing project. Provides for three rubblemound 
breakwaters to form a protected harbor with two 
entrances, each about 400 feet wide in depths of 36 feet 
at northeast and northwest corners of the harbor. West 
breakwater 1700 feet long, east breakwater 1,100 feet 
long extending northerly from shore, and a detached 
north breakwater 3,300 feet long located parallel to 
and approximately 2,000 feet from, the shoreline. All 
depths refer to mean lower low water. Tidal range 
between mean lower low water and mean higher high 
water is 5.5 feet. Extreme range is about 10 feet. 
Approved estimated cost for new work (1970) is $12, 
800,000 of which $8,830,000 is Federal cost (excludes 
Coast Guard cost) and $3,970,000 to be contributed by 
local interests. (See table 34-B for authorizing legislation.) 
Local cooperation. Fully complied with for work 
performed. Act of July 14, 1960, requires local interests 
contribute 32 percent of project cost, either in a lump 
sum before start of construction or in installments 
before start of pertinent work items; provide lands and 
rights-of-way for construction and maintenance; hold 
the United States free from damages; acquire and hold 
in public interest sufficient lands for construction of 
necessary berthing facilities and public utilization 
thereof; provide necessary berthing facilities and 
utilities, including a public landing with suitable 
supply facilities and utilities, open to all equally; 
provide royalty-free stone for construction and maintenance 
of breakwaters; provide suitable marine-repair 
facilities; and maintain entire project except breakwaters. 
Council of city of Monterey, by Resolutions No. 
8776 C.S., dated April 1, 1958, and No. 9792 C.S., 
dated December 4, 1962, furnished assurances of their 
willingness and ability to comply with requirements 
and by letter dated February 18, 1968, indicated 
approval of the modified breakwater plan. 
Terminal facilities. Within protected harbor existing 
commercial facilities, exclusive of facilities owned by 
the United States, consist of two publicly owned 
wharves with a total of about 2,600 feet of berthing 
space, one boat fueling station, one machine shop and 
other facilities for servicing fishing boats, and a 346- 
berth harbor for light-draft vessels. Outside protected 
harbor there is one boatbuilding and repair plant and 
other facilities for servicing fishing boats. These 
facilities, together with those required to be constructed 
as an item of local cooperation for authorized project, 
will provide adequate facilities for present and prospective 
commerce. 
Operations and results during fiscal year. New work: 
Advance engineering and design for construction of 
north and east breakwaters based on hydraulic model 
test results was continued by hired labor and General 
Design Memorandum completed. 
Condition at end of fiscal year. Existing project is about 
10 percent complete. Work remaining is construction 
of north and east breakwaters. The 1,700-foot west 
breakwater was completed in 1934 and harbor 
dredging in 1947. Planning for uncompleted portion of 
project is about 70 percent complete. 
4. NOYO RIVER AND HARBOR, CALIF. 
Location. Noyo Harbor is a cove on California coast 
about 87 miles south of Humboldt Bay and 135 miles 
northwest of San Francisco. Noyo River rises in Coast 
Range Mountains, flows westerly, and empties into 
Noyo Harbor. (See Coast and Geodetic Survey Chart 
5703.) 
Previous projects. For details see page 1680, Annual 
Report for 1929, and page 1772, Annual Report for 
1930. 
1027

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Existing project. Provides for two entrance jetties; an 
entrance channel into Noyo River 10 feet deep and 100 
feet wide and channel in river 10 feet deep and 150 feet 
wide extending about 0.6 mile above mouth, thence 
connecting channel about 400 feet long to mooring 
basin of about 8.5 acres 10 feet deep on south bank of 
river. All depths refer to mean lower low water. Tidal 
range between mean lower low water and mean higher 
high water is 5.8 feet. Extreme range is about 11.5 feet. 
Cost of new work construction completed in 1931 was 
$184,000, exclusive of amounts expended on previous 
projects. Minor rehabilitation of jetties completed in 
1961 cost $222,810 exclusive of $1,700 contributed 
funds. A 400-foot channel extension, mooring basin 
and connecting channel were constructed by Noyo 
Harbor District in 1968. Breakwater portion of project 
is considered inactive. Cost of this portion, last revised 
in 1963, was estimated to be $13,830,000 Federal cost 
and $340,000 to be contributed by local interests. (See 
table 34-B for authorizing legislation.) 
Local cooperation. Act of July 3, 1930, requires local 
interests provide spoil-disposal areas, royalty-free stone 
for construction and repair of jetties, and rights-of-way 
for transporting stone to jetties. These requirements 
fully complied with for work performed. Expenditures 
by local interests in meeting requirements, in constructing 
privately owned shore-side harbor facilities, 
and in constructing the mooring basin are estimated to 
be in excess of $3 million. Noyo Harbor District 
furnished assurances of local cooperation required by 
Act of July 14, 1960, but subsequently obtained an 
Economic Development Administration grant and 
State of California loan for local construction of the 
authorized mooring basin. A 400-foot extension of the 
river channel to the mooring basin will be Federally 
maintained. The mooring basin will be maintained by 
Noyo Harbor District. 
Terminal facilities. None in harbor proper. In river 
above harbor there are two piers and nine fishreceiving 
wharves; three boat fueling wharves; two 
boat building and repair plants; one boat icing plant; 
three marine ways; and a number of privately owned 
mooring facilities. These facilities, together with those 
provided in the new mooring basin are adequate fo r 
existing commerce. 
Operations and results during fiscal year. New work: 
Advance engineering and design classification of 
breakwaters to inactive status. Maintenance: Engineering 
and design including dredging survey by 
hired labor and 41,107 cubic yards of shoaled material 
removed from project channels under contract awarded 
in prior fiscal year. 
Condition at end offiscalyear. Project is complete except 
for construction of breakwaters in Noyo Harbor which 
is considered inactive. Mooring basin and connecting 
channel in river, constructed by local interests, was 
completed in October 1968. Jetties, rock removal and 
dredging entrance and river channels completed in 
1931. Minor rehabilitation of jetties and north wall 
completed in September 1961. Total cost of existing 
project to end of fiscal year was $1,858,079, of which 
$450,987 was for new work, $1,182,582 for maintenance, 
and $224,510 for minor rehabilitation of 
jetties and north wall ($222,810 regular funds and $1, 
700 contributed funds). 
5. OAKLAND HARBOR, CALIF. 
Location. On eastern side of San Francisco Bay, 
opposite city of San Francisco. Inner harbor is between 
cities of Oakland and Alameda. (See Coast and 
Geodetic Survey Chart 5535.) 
Previous projects. For details see page 1979 of Annual 
Report for 1915, page 1755 of Annual Report for 1921, 
and page 1674 of Annual Report for 1938. 
Existing project. Provides entrance channel to Oakland 
Outer Harbor, 35 feet deep from deep water in 
San Francisco Bay and 800 feet wide across shoal 
southeast of Yerba Buena Island, narrowing to 600 feet 
at Oakland Mole; thence a channel and turning basin 
35 feet deep and from 600 to 950 feet wide in outer 
harbor to Army base. Project also provides entrance 
channel to Oakland Inner Harbor, 35 feet deep and 
800 feet wide at bayward end, narrowing to 600 feet 
wide at ends of Oakland jetties; a channel from ends of 
jetties 35 feet deep and 600 feet wide to west end of 
Government Island, with additional widening to 
within 75 feet of pierhead line in front of Grove and 
Market Street (formerly municipal) piers and along 
south side of channel from Harrison Street eastward to 
harbor-line point 119 in Brooklyn Basin; a channel 35 
feet deep and 500 feet wide through Brooklyn Basin; 
for dredging 35 feet deep a triangular area about 2,700 
feet long and maximum width of 300 feet at western 
end of Brooklyn Basin; a channel along north side of 
Brooklyn Basin 35 feet deep and 300 feet wide for 1,300 
feet, thence 25 feet deep to a turning basin at east end 
of Brooklyn Basin 35 feet deep, 500 feet wide, and 1,200 
feet long; a channel in tidal canal 35 feet deep and 275 
feet wide from Brooklyn Basin to Park Street, thence 18 
feet deep to San Leandro Bay; a total channel length of 
8.5 miles from San Francisco Bay to San Leandro Bay. 
Project also includes parallel rubblemound jetties at 
entrance to inner harbor, north jetty 9,500 feet long 
and south jetty 12,000 feet long; three highway bridges 
across tidal canal, two of which (at Park Street and 
High Street) have been replaced by local interests. 
Railroad and highway bridges at Fruitvale Avenue are 
maintained and operated by the United States. All 
depths refer to mean lower low water. Range between 
mean lower low water and mean higher high water is 6 
feet in outer harbor and 6.3 feet in inner harbor at Park 
Street Bridge. Extreme range is about 11 feet. 
Approved estimated cost for new work (1970), exclusive 
of amounts expended on previous projects, is $9, 
238,000 of which $8,622,000 is Federal cost and $616, 
000 to be contributed by local interests. Deepening 
1028

SAN FRANCISCO, CALIF., DISTRICT 
tidal canal from 18 to 25 feet and Federal participation 
in reconstruction of Fruitvale Avenue Highway Bridge 
to be restudied and are excluded from foregoing cost 
estimate. Estimated cost of tidal canal deepening 
(1954) is $489,069. Restudy of Federal participation in 
reconstruction of Fruitvale Avenue Highway Bridge 
initiated with Operation and Maintenance funds. (See 
table 34-B for authorizing legislation.) 
Local cooperation. Act of January 21, 1927, requires 
that future maintenance by the United States of north 
channel in Brooklyn Basin be contingent upon removal 
by local interests of all sewers emptying therein, or, in 
lieu of such removal, upon contribution of one-half the 
cost of maintenance. This requirement has not been 
fulfilled. In compliance with a 1910 license issued by 
Secretary of War pursuant to provisions of act of June 
25, 1910, local interests replaced bridges at Park Street 
and High Street and are operating and maintaining 
them. They operated and maintained a combined 
highway and railroad bridge at Fruitvale Avenue until 
1942 when California Court of Appeals ruled that it 
was illegal for County of Alameda to use appropriated 
funds for sole benefit of a private corporation. Southern 
Pacific Railroad Co. operated trains over combined 
bridge until June 1951 when a separate railroad 
bridge, constructed for its use by the Federal Government, 
was placed in operation. (Railroad and 
highway bridges at Fruitvale Ave. are maintained and 
operated by the United States.) All other requirements 
have been fully complied with. Only fragmentary 
records are available of costs to local interests in 
meeting requirements of local cooperation. Recorded 
expenditures are in excess of $11 million. Act of 
October 23, 1962, requires that local interests provide 
lands and rights-of-way for construction and maintenance; 
hold the United States free from damages to 
wharves, piers, tubes, and other marine and submarine 
structures due to initial dredging and future maintenance; 
alter sewer, water supply, drainage, and other 
utility facilities; provide and maintain adequate public 
terminal and transfer facilities, open to all equally; 
deepen and maintain slips and berths; and if required 
furnish spoil-disposal areas including necessary dikes, 
bulkheads and embankments for initial dredging and 
future maintenance. State of California, on September 
12, 1961, furnished assurances that it will hold the 
United States free from liability for damages to Posey 
and Webster Street Tubes due to initial dredging and 
subsequent maintenance. 
Terminal facilities. See Port Series No. 31, "The Ports 
of Oakland, Alameda, and Richmond, and Ports on 
San Pablo Bay, Carquinez Strait, and Mare Island 
Strait," revised 1962. Facilities will be adequate for 
existing commerce upon completion of 7th Street 
Terminal under construction to provide an additional 
nine deep-water berths. 
Operations and results during fiscal year. New work: 
Advance engineering and design for deepening inner 
harbor channels continued by hired labor. Maintenance: 
Dredging surveys of project channels cost $20, 
768; operation and maintenance of Fruitvale Avenue 
highway and railroad bridges by hired labor cost $73, 
305; miscellaneous minor rehabilitation of Fruitvale 
Avenue highway and railroad bridges and engineering 
and design studies of highway bridge replacement, cost 
$97,400. 
Condition at end of fiscal year. Existing project is about 
33 percent complete. Work remaining is deepening 
inner harbor channels to 35 feet and portion being 
restudied. Advance engineering and design for channel 
deepening is about 71 percent complete. Jetties were 
completed in 1894. Dredging existing project channels 
was carried on from 1910 to 1931 when 30-foot depth 
was attained. The 35-foot depth in channel to outer 
harbor was attained in 1942 with military funds. Cost 
of existing project to end of fiscal year was $12,636,784, 
of which $2,959,586 was for new work ($2,876,039 
regular funds and $83,547 contributed funds), and $9, 
677,198 regular funds for maintenance. 
6. REDWOOD CITY HARBOR, CALIF. 
Location. On Redwood Creek, a tributary of San 
Francisco Bay about 20 miles south of city of San 
Francisco. Project works also include a channel in San 
Francisco Bay east of Point San Bruno. (See Coast and 
Geodetic Survey Chart 5531.) 
Previous projects. For details see page 1979 of Annual 
Report for 1915, and page 1672 of Annual Report for 
1938. 
Existing project. Channel 500 feet wide and 30 feet 
deep across San Bruno Shoal in San Francisco Bay; a 
channel 300 feet wide and 30 feet deep to vicinity of 
confluence of West Point Slough and Redwood Creek, 
with a basin at that location 2,200 feet long and from 
400 to 900 feet wide; thence a channel 400 feet wide, 30 
feet deep, and about 1,300 feet long flaring to a second 
turning basin about 900 feet wide, 1,700 feet long, and 
30 feet deep; thence a channel 150 feet wide and 5 feet 
deep extending to Steinberger Slough. All depths refer 
to mean lower low water. Tidal range between mean 
lower low water and mean higher high water is 6.9 feet 
at Point San Bruno and 7.9 feet at Redwood City. 
Extreme ranges are estimated to be 12 and 13 feet at 
respective localities. Authorized channel across San 
Bruno Shoal is about 4.3 miles long. In the creek, 
authorized deepwater channel is 3.4 miles long 
including basins, and 5-foot channel extends to mile 
4.3. New work under project cost $1,641,279 exclusive 
of $119,572 contributed by local interests and amounts 
expended on previous projects. (See table 34-B for 
authorizing legislation.) 
Local cooperation. Fully complied with for work 
performed. Estimated costs for all requirements under 
terms of project authorization, including required non- 
Federal contributions, were $2,300,000 (price as of 
dates of compliance). Local interests must provide 
1029

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
rights-of-way and spoil-disposal areas with necessary 
impounding works for project maintenance. 
Terminal facilities. See Port Series No. 30, "The Ports 
of San Francisco and Redwood City," revised 1962. A 
new public wharf, a privately owned pier for receipts of 
sand and gravel, and a marine repair works pier have 
been constructed since 1962. Facilities are adequate for 
existing commerce. 
Operations and results during fiscal year. Maintenance: 
Engineering and design including dredging surveys by 
hired labor and U.S. hopper dredge Harding removed 
639,000 cubic yards of shoaled material from entrance 
channel and turning basins. 
Condition at end of fiscal year. Project completed in 
January 1965. Total cost of existing project to end of 
fiscal year was $4,103,313, of which $1,760,851 was for 
new work ($1,641,279 regular funds and $119,572 
contributed funds) and $2,342,462 regular funds for 
maintenance. 
7. RICHMOND HARBOR, CALIF. 
Location. On eastern shore of San Francisco Bay 
about 10 miles north of Oakland. (See Coast and 
Geodetic Survey Chart 5532.) 
Existing project. Channel 35 feet deep and 600 feet 
wide adjacent to Southampton Shoal from deep water 
in San Francisco Bay to outer harbor; inner harbor 
entrance channel 35 feet deep and 600 feet wide from 
deep water to Point Richmond, with a turning basin at 
that point; thence a channel 35 feet deep and 500 feet 
wide flaring to about 600 feet at Point Potrero with a 
turn at that point 1,150 feet wide and 35 feet deep 
except for a depth of 30 feet at southerly apex of bend; 
thence 35 feet deep and 850 feet wide to entrance to 
Santa Fe Channel; thence 35 feet deep and 200 feet 
wide in Santa Fe Channel for about 2,000 feet, and 
maintenance to depth of 30 feet of remainder of Santa 
Fe Channel and basin; a rubblemound training wall 
10,000 feet long extending westerly from Brooks Island; 
approach areas 32 feet deep to within 75 feet of 
pierhead line in outer harbor at Point San Pablo and 
Point Orient; a channel 20 feet deep, 150 feet wide, 
and about 2,000 feet long from deep water in San Pablo 
Bay easterly along north side of Point San Pablo; a 
maneuvering area at Richmond Long Wharf 45 feet 
deep; and a West Richmond Channel 45 feet deep, 600 
feet wide, and about 2.5 miles long through west 
navigation opening of Richmond-San Rafael Bridge. 
All depths refer to mean lower low water. Tidal range 
between mean lower low water and mean higher high 
water is 5.8 feet, with an extreme range of about 11 feet. 
New work, completed in 1957, cost $2,886,695, 
exclusive of $524,778 contributed by local interests. 
Estimated cost (1970) for 45-foot-deep maneuvering 
area at Richmond Long Wharf and for West Richmond 
Channel, authorized as part of Sacramento 
District project "San Francisco Bay to Stockton, 
California (John F. Baldwin and Stockton Ship 
Channels)," is about $7,300,000. (See table 34-B for 
authorizing legislation.) 
Local cooperation. Fully complied with for work 
performed. Estimated cost for all requirements under 
terms of project authorization, including required non- 
Federal contributions, were $4 million (price as of dates 
of compliance). Local interests must furnish easements 
and spoil-disposal areas for maintenance dredging. 
(See Sacramento District project "San Francisco Bay 
to Stockton, California (John F. Baldwin and Stockton 
Ship Channels)" for requirements of Act of October 27, 
1965.) By Resolution adopted August 6, 1963, Board of 
Supervisors of Contra Costa County indicated willingness 
to meet irequirements applicable to West 
Richmond Channel and maneuvering area at Richmond 
Long Wharf. 
Terminal facilities. See Port Series No. 31, "The Ports 
of Oakland, Alameda, and Richmond and Ports on 
San Pablo Bay, Carquinez Strait, and Mare Island 
Strait," revised 1962. A privately owned dock for 
receipt of sand and gravel and two small-boat basins 
have been constructed since 1962. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Planning for San Francisco Bay to Stockton project 
continued, including study by U.S. Fish and Wildlife 
Service of effect of dredge spoils on fish and wildlife. 
Maintenance: Engineering and design including 
dredging surveys of project channels and U.S. hopper 
dredge. Harding removed 351,000 cubic yards of 
shoaled material from inner harbor channel and 
entrance. 
Condition at end of fiscal year. Existing project completed 
in 1957, except for dredging West Richmond 
Channel and enlarging and deepening to 45 feet the 
maneuvering area at Richmond Long Wharf authorized 
as part of San Francisco Bay to Stockton 
project. Dredging project channels was initiated in 
1918 and carried on intermittently until 1940. Training 
wall was completed in 1931, and channel in San 
Pablo Bay in 1945. Dredging authorized by act of 
September 3, 1954, was initiated in October 1955 and 
the Southampton Shoal Channel and enlarging and 
deepening to 35 feet the approach area to Richmond 
Long Wharf were completed in March 1956, inner 
harbor channels in December 1956, Santa Fe Channel 
in January 1957, and removal of rock near Point 
Potrero in October 1957. Minor rehabilitation of 
training wall completed in 1967. 
8. SAN FRANCISCO HARBOR, CALIF. 
Location. Works included are in San Francisco Bay, in 
vicinity of San Francisco, and in approach channels to 
Golden Gate, the bay entrance. (See Coast and 
Geodetic Survey Chart 5532.) 
Previous projects. For details see page 1978 of Annual 
Report for 1915, page 1749 of Annual Report for 1921, 
1030

SAN FRANCISCO, CALIF., DISTRICT 
page 1633 of Annual Report for 1929, and page 1669 of 
Annual Report for 1938. 
Existing project. Dredged channel through San Francisco 
Bar on line of main ship channel, 55 feet deep and 
2,000 feet wide; removal of Presidio Shoal, Black Point 
Shoal, Rincon Reef Rock (inner), Rincon Reef Rock 
(outer), Blossom Rock, and Alcatraz Shoal westward of 
a north-and-south line 2,500 feet west of Alcatraz 
Light, to 40 feet deep; removal of Arch Rock, Shag 
Rocks 1 and 2, Harding Rock, Point Knox Shoal 
westward of a north-and-south line through Point 
Stuart Light, and a portion of shoal channelward of 
pierhead line near mouth of Islais Creek, to 35 feet 
deep; and dredging a channel 750 feet wide and 10 feet 
deep from that depth in bay to San Francisco Airport 
ending in a basin 10 feet deep and about 2,000 feet 
wide. All depths refer to mean lower low water. Tidal 
range between mean lower low water and mean higher 
high water is 5.7 feet at Fort Point and 7.2 feet at San 
Francisco Airport. Extreme ranges at foregoing localities 
are 10.6 and 12 feet, respectively. New work 
completed in 1959 cost $1,658,957, exclusive of $134, 
591 contributed funds and amounts expended on 
previous projects. Estimated cost (1970) for deepening 
Bar Channel from 50 to 55 feet, authorized as part of 
Sacramento District project "San Francisco Bay to 
Stockton, California (John F. Baldwin and Stockton 
Ship Channels)," is about $3,600,000. (See table 34-B 
for authorizing legislation.) 
Local cooperation. Fully complied with for work 
completed. Local interests must furnish suitably 
bulkheaded spoil-disposal areas for maintenance of 
channel to San Francisco Airport. (See Sacramento 
District project "San Francisco Bay to Stockton, 
California (John F. Baldwin and Stockton Ship 
Channels)" for requirements of Act of October 27, 
1965.) By Resolution adopted August 6, 1963, Board of 
Supervisors of Contra Costa County indicated willingness 
to meet requirements applicable to deepening 
San Francisco Bar Channel. 
Terminal facilities. See Port Series No. 30, "The Ports 
of San Francisco and Redwood City," revised 1962. A 
new deep-water terminal has been constructed since 
1962. Facilities are considered adequate for existing 
commerce. 
Operations and results during fiscal year. New work: 
Planning for San Francisco Bay to Stockton project 
continued. Maintenance: Condition and operation 
studies and dredging surveys of project channels by 
hired labor and U.S. hopper dredge. Biddle removed 
203,500 cubic yards of matrial from main ship 
channel. 
Condition at end of fiscal year. Existing project completed 
in 1959 except for deepening Bar Channel from 
50 to 55 feet authorized as part of San Francisco Bay to 
Stockton project. Dredging Islais Creek Shoal was 
completed in 1930, deepening Presidio Shoal in 1931, 
removal of various rocks in 1932, deepening Point 
Knox Shoal in 1934, deepening Alcatraz Shoal in 1936, 
deepening Black Point Shoal in 1937, dredging 
channel and basin at San Francisco Airport in 1941, 
and completion of bar channel 50 feet deep in 1959. 
Cost of existing project to end of fiscal year was $7,452, 
976, of which $1,793,548 was for new work ($1,465,957 
regular funds, $193,000 Public Works funds, and $134, 
591 contributed funds) and $5,659,428 regular funds 
for maintenance. 
9. SAN FRANCISCO HARBOR AND BAY, 
CALIF. 
Location. Project applies to San Francisco Bay, lower 
San Francisco Bay, Oakland Harbor, Richmond 
Harbor, San Pablo Bay and Mare Island Strait, 
Richardson Bay, and their tributaries. 
Existing project. Collection and removal of drift from 
San Francisco Bay and its tributary waters. New work 
portion of project (acquisition of plant and equipment) 
is considered inactive. Estimated cost of this portion 
(1962) is $1,110,000. (See table 34-B for authorizing 
legislation.) 
Local cooperation. None required. 
Terminal facilities. Described in pertinent separate 
project descriptions. 
Operations and results during fiscal year. Maintenance: 
Floating debris was collected and disposed of from 
project waterways by hired labor. Engineering and 
design completed and contract awarded for modification 
of debris-handling facilities required to 
implement a land-fill method of disposal in lieu of 
burning. 
Condition at end of fiscal year. No new work construction 
funds have been appropriated. Maintenance operations 
under existing project commenced July 1950. 
Costs for removal of drift before that time were carried 
as maintenance on applicable authorized river and 
harbor projects in the area. 
10. SAN PABLO BAY AND MARE ISLAND 
STRAIT, CALIF. 
Location. Channel extends from a point in lower end 
of San Pablo Bay west of Pinole Point generally 
northeasterly across Pinole Shoal in San Pablo Bay to 
junction of Carquinez Strait and Mare Island Strait, 
thence northwesterly in Mare Island Strait along 
frontage of Mare Island Navy Yard. (See Coast and 
Geodetic Survey Chart 5533.) 
Previous projects. For details see page 1680, Annual 
Report for 1938. 
Existing project. Dredged channel across Pinole Shoal 
in San Pablo Bay 600 feet wide, 45 feet deep, and about 
11 miles long, with a maneuvering area 45 feet deep 
adjacent to Oleum Pier at mouth of Carquinez Strait; 
a channel in Mare Island Strait 700 feet wide and 30 
feet deep flaring to a turning basin generally 1,000 feet 
wide from former dike 6, Mare Island, to a line 75 feet 
1031

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
southerly from causeway between Vallejo and Mare 
Island, 30 feet deep, except at northerly end where 
project depth is 26 feet; maintenance of two approach 
areas to navy yard piers at southern end of Mare 
Island. All depths refer to mean lower low water. Tidal 
range between mean lower low water and mean higher 
high water is 5.8 feet at lower end of San Pablo Bay, 
and 6 feet opposite Mare Island Navy Yard, with an 
extreme range of about 10 feet. New work completed in 
1943 cost $282,669 exclusive of amounts expended on 
previous projects. Uncompleted dredging of two 
approach areas at Vallejo and South Vallejo is 
considered inactive. Estimated cost of this portion 
(1956). is $120,000. Estimated cost (1970) of lengthening 
and deepening Pinole Shoal Channel to 45 feet 
and of dredging maneuvering area 45 feet :deep at 
Oleum pier, authorized as part of Sacramento District 
project "San Francisco Bay to Stockton, California 
(John F. Baldwin and Stockton Ship Channels)," is 
about $13,100,000. (See table 34-B for authorizing 
legislation.) 
Local cooperation. None required for work to date. (See 
Sacramento District project "San Francisco Bay to 
Stockton, California (John F. Baldwin and Stockton 
Ship Channels)" for requirements of Act of October 27, 
1965.) By resolution adopted August 6, 1963, Board of 
Supervisors of Contra Costa County indicated willingness 
to meet requirements applicable to deepening 
Pinole Shoal Channel and dredging maneuvering area 
at Oleum Pier. 
Terminal facilities. See Port Series No. 31, "The Ports 
of Oakland, Alameda, and Richmond and Ports on 
San Pablo Bay, Carquinez Strait, and Mare Island 
Strait," revised 1962. Facilities considered adequate for 
existing commerce. 
Operations and results during fiscal year. New work: 
Planning for San Francisco Bay to Stockton project 
continued, including study by U. S. Fish and Wildlife 
Service of effect of dredge spoils on fish and wildlife. 
Maintenance: Engineering and design including 
dredging surveys by hired labor and U. S. hopper 
dredge Harding removed 1,742,000 cubic yards of 
shoaled material from Mare Island Strait and 290,500 
cubic yards from Pinole Shoal Channel. 
Condition at end of fiscal year. Existing project was 
completed in 1943 except for portion considered 
inactive (approach areas at Vallejo and South Vallejo) 
and enlarged Pinole Shoal Channel and maneuvering 
area at Oleum authorized as part of San Francisco Bay 
to Stockton project. Pinole Shoal Channel 35 feet deep 
was completed in 1929. Mare Island Strait Channel 
and turning basin was completed in 1943. Costs of 
existing project to end of fiscal year were $282,669 for 
new work and $10,382,010 for maintenance, total $10, 
664,679. 
11. SAN RAFAEL CREEK, CALIF. 
Location. A small, mainly tidal stream about 2 miles 
in length, flowing easterly and emptying into the west 
side of San Francisco Bay, 14 miles north of San 
Francisco. (See U.S. Coast and Geodetic Survey chart 
No. 5532.) 
Existing project. Provides for a channel 8 feet deep and 
100 feet wide across flats in San Francisco Bay to 
mouth of creek; thence 6 feet deep and 60 feet wide to 
Irwin Street, San Rafael; a cutoff through Goose Neck 
Bend, and a turning basin 200 feet long, 100 feet wide, 
and 6 feet deep at San Rafael, near head of the project. 
All depths refer to mean lower low water. The length of 
section under improvement is 3.5 miles, of which 2 
miles are in San Francisco Bay, outside mouth of creek. 
The tidal range between lower low water and mean 
higher highwater is 5.7 feet, with an extreme range of 
10.5 feet. The cost of new work under the project, 
completed in 1928, was $32,359, exclusive of $41,094 
contributed funds. (See table 34-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. Total estimated 
costs for all requirements of local cooperation 
under terms of project authorization, including required 
non-Federal contributions, amount to $41.,100 
(price as of dates of compliance). 
Terminal facilities. There are 8 wharves, 6 of which are 
for the receipt of bulk petroleum products; 2 boatbuilding 
and repair plants; 4 yacht harbors and 4 
boat-fueling stations; and 11 moorings and bulkhead 
landings; all privately owned. These facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Engineering and design by hired labor including 
dredging surveys and 242,887 cubic yards of shoaled 
material removed from project channels by contract. 
Condition at end of fiscal year. Project completed in 
1928. 
12. SANTA CRUZ HARBOR, CALIF. 
Location. On north shore of Monterey Bay about 65 
miles south of entrance to San Francisco Bay and 14 
miles north of Moss Landing, the nearest small-boat 
harbor. (See Coast and Geodetic Survey charts 5402 
and 5403.) 
Existing project. Provides for a small-boat harbor 
consisting of two entrance jetties, east jetty 850 feet long 
and west jetty 1,125 feet long, protecting an entrance 
channel 100 feet wide, 20 feet deep, and 900 feet long, 
thence 15 feet deep for an additional 370 feet; an inner 
harbor channel 15 feet deep, 150 feet wide, and 800 feet 
long, thence 10 feet deep for an additional 600 feet, 
entering a turning basin 10 feet deep, 300 feet wide, 
and 207 feet long, and a sand-bypassing plant if 
required. All depths refer to mean lower low water. 
Tidal range between mean lower low water and mean 
higher high water is 5.3 feet. Extreme range is about 
1032

SAN FRANCISCO, CALIF., DISTRICT 
10.5 feet. Approved estimated cost for new work (1970) 
is $2,910,000, of which $1,890,000 (exclusive of Coast 
Guard cost) is Federal cost and $1,020,000 to be 
contributed by local interests (exclusive of $18,000 
contributed in lieu of providing royalty-free jetty stone) 
. (See table 34-B for authorizing legislation.) 
Local cooperation. Fully complied with for completed 
jetties and channels. Port district constructed portion of 
project for which they are responsible, furnished 
necessary real estate, and provided $915,000 for initial 
share of required cash contribution (35.1 percent of 
project first cost) and in lieu of providing royalty-free 
stone. Local interests are required to maintain project 
except jetties and dredged depths in entrance channel, 
inner channel, and turning basin until commencement 
of sand-bypassing, at which time they will assume 
operation and maintenance of sand-bypassing plant, 
make replacements thereto, and maintain dredged 
dept hs in entrance channel, inner harbor channel, and 
turning basin with understanding that United States 
will reimburse local interests for actual cost of plant 
operation, maintenance, and replacement up to a limit 
of $35,000 annually, and with further understanding 
that cost of any required channel or basin maintenance 
incurred by the United States will be deducted from 
estimated $35,000 annual Federal reimbursement. 
Santa Cruz Port District, by resolution dated December 
3, 1957, furnished assurances of their willingness 
and ability to comply with requirements. 
Terminal facilities. In the natural harbor there is one 
municipally owned wharf with facilities for fueling and 
servicing boats and receiving, handling, and processing 
fresh fish. The small-boat harbor includes a municipal 
pier, utilities, and berthing, marine repair and supply 
facilities. These are considered adequate for existing 
commerce but local interests have developed harborexpansion 
plans to provide an additional 500 berths to 
meet recreational boating needs. A detailed project 
report on possible Federal participation in general 
navigation features of the expanded harbor has been 
completed under authority of Section 107 of the 1960 
River and Harbor Act. 
Operations and results during fiscal year. New work: 
Engineering studies for construction of sand bypassing 
plant continued by hired labor. Maintenance: Engineering 
and design including dredging surveys by 
hired labor and 107,213 cubic yards of shoaled material 
removed by contract from project channels. 
Condition at end offiscalyear. Project is about 85 percent 
complete. Jetties were completed in June 1963 and 
channel dredging in November 1963. Work remaining 
is construction of sand-bypassing plant on which 
engineering and design is in progress. 
13. RECONNAISSANCE AND CONDITION 
SURVEYS 
Reconnaissance and condition surveys of channels 
and harbor structures made throughout the year. No 
maintenance work was accomplished on the Crescent 
City Harbor, Monterey Harbor, Moss Landing Harbor, 
Napa River or Petaluma River projects during 
Fiscal Year 1970. 
14. OTHER AUTHORIZED NAVIGATION 
PROJECTS. 
See table 34-C. 
15. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to section 107, Public Law 86- 
645 (preauthorization) 
See table 34-D. 
BEACH EROSION CONTROL 
16. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECTS 
See table 34-E.
FLOOD CONTROL 
17. ALAMEDA CREEK, CALIF. 
Location. Drains an area of 695 square miles of Coast 
Range on eastern shore of southern arm of San 
Francisco Bay. Arroyo del Valle, largest subtributary, 
drains 173 square miles of southern portion of interior 
basin. (See Geological Survey quadrangles Newark 
and Niles.) 
Existing project. Provides for levees, channel enlargement, 
bank protection and recreational trails 
system to be constructed by Federal Government in 
Coastal Plain of Alameda Creek from mouth in San 
Francisco Bay about 13 miles to west end of Niles 
Canyon; and Federal participation in cost of Del Valle 
Dam and Reservoir to be constructed by State of 
California on Arroyo del Valle. Construction of Del 
Valle Dam about 227 feet above streambed will 
provide a gross storage capacity of 77,000 acre-feet for 
flood control and water conservation. Federal Government 
will provide a cash contribution commensurate 
with flood control benefits to be derived 
from reservoir, or 30.7 percent of construction cost, but 
not to exceed $4,080,000, plus present worth of 
operation, maintenance, and replacement costs allocated 
to flood control during next 50 years. Approved 
estimated project cost (1970) is $58,970,000, of which 
$28,560,000 pertains to Coastal Plain channel improvements 
and $30,410,000 pertains to Del Valle 
Reservoir; total Federal cost is $22,190,000 ($17,100, 
000 Coastal Plain and $5,090,000 participation in Del 
Valle Reservoir including a Federal contribution of $4, 
080,000 toward construction cost and $776,000 present 
worth of estimated operation and maintenance costs for 
50 years allocated to flood control); total non-Federal 
cost is $36,780,000 ($11,345,000 Coastal Plain lands 
and relocations, contribution of $115,000 for recreation 
1033

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
facilities, and $25,320,000 Del Valle Reservoir). (See 
table 34-B for authorizing legislation.) 
Local cooperation. Authorizing legislation requires that 
local interests provide lands and rights-of-way for 
construction; hold the United States free from damages; 
relocate all highway bridges, approaches thereto, 
and utilities for construction and maintenance; maintain 
and operate completed works; prevent any 
encroachment on flood channels, ponding areas, and 
reservoir area that would decrease effectiveness of 
project for flood control; adjust all claims regarding 
water rights which might affect, or be affected by, the 
project; assume 50 percent of the cost of recreation 
facilities in the Coastal Plain; and design and construct 
a multiple-purpose reservoir on Arroyo Del Valle 
subject to review and approval by Chief of Engineers of 
features relating to flood control. Authorizing legislation 
further requires that Department of Army and 
State of California enter into an agreement providing 
for operation of Del Valle Dam and Reservoir in such 
manner as to produce necessary flood control benefits 
upon which monetary contribution is based. Board of 
Supervisors of Alameda County Flood Control and 
Water Conservation District, by Resolution No. 5937 
adopted May 26, 1964, furnished assurances of local 
cooperation for channel improvements; by Resolution 
No. 7557 dated June 6, 1967, agreed to maintain 
project landscaping; and by letter dated March 22, 
1968, stated its intent to provide local cooperation for 
the Coastal Plain recreational trail system. By Resolution 
No. 3078 adopted April 2, 1968, the Board of 
Directors of the East Bay Regional Park District 
furnished assurances that they will share at least 50 
percent of the cost of the trail system, operate and 
maintain the facilities and assure access to all on equal 
terms. Plans for various highway bridge and utility 
relocations have been submitted for review; rights-ofway 
are being acquired and highway bridge and utility 
relocations accomplished in advance of channel 
construction in individual reaches. State of California 
completed construction of Del Valle Dam in August 
1968 and all requirements of local cooperation 
complied with. 
Operations and results during fiscal year. New Work: 
Engineering and design for Coastal Plain channel 
improvements and Del Valle Dam and Reservoir by 
hired labor. Under a continuing contract awarded 
during the prior year for third-stage channel construction 
(miles 7.5 to 12.0), 1,285,470 cubic yards of 
excavation, 420,000 cubic yards of embankment, 43, 
051 tons of stone and 21,000 cubic yards of bedding 
material were placed to complete about 53 percent of 
contract work in this channel reach. The State of 
California was reimbursed $1,456,000 to complete 
payment of the Federal share of the cost of Stateconstructed 
Del Valle Dam and Reservoir. 
Condition at end of fiscal year. Coastal Plain channel 
improvements begun in April 1965 are 72 percent 
complete. Relocation of the Southern Pacific Railroad 
Bridge was completed in November 1969. State of 
California contract for construction of Del Valle Dam 
began in March 1966 and was completed in August 
1968. State contract for relocation of Arroyo Road was 
completed in December 1966. 
18. CORTE MADERA CREEK, CALIF. 
Location. Creek and tributaries drain an area of 28 
square miles in Marin County, Calif., and discharge 
into west side of San Francisco Bay at a point about 9 
miles north of Golden Gate. (See Geological Survey 
quadrangle San Rafael.) 
Existing project. Provides for about 11 miles of channel 
improvements, including realinement, enlargement, 
levees, riprapping, rectangular concrete sections, interior 
drainage facilities, bridge relocations, and debris 
removal on Corte Madera Creek and lower reaches of 
its tributaries, and a continuous channel right-of-way 
to deep water in San Francisco Bay reserved to assure 
channel outlet in the event of future tideland reclamation. 
Approved estimated cost for new work 
(1970) is $10,860,000 of which $10,700,000 is Federal 
cost and $160,000 to be contributed by local interests. 
(See table 34-B for authorizing legislation.) 
Local cooperation. Local interests must provide lands 
and rights-of-way, including suitable areas for disposal 
of waste material; modify or relocate all bridges and 
utilities necessary for construction and maintenance; 
hold the United States free from damages; maintain 
and operate completed project and prevent encroachment 
on flood channels that would decrease 
effectiveness of project for flood control; adjust all 
claims regarding water rights that might be affected by 
project; contribute in cash 1.5 percent of Federal 
construction cost of Ross Valley unit and tidal areas, an 
estimated $160,000. Local interests have requested 
staged construction of the project. By Resolutions No. 
8861, No. 9261 and No. 9414 dated March 29, 1966, 
March 28, 1967 and August 15, 1967, respectively, the 
Board of Supervisors of Marin County Flood Control 
and Water Conservation District furnished assurances 
of willingness and ability to meet requirements for 
portion of project below Sir Francis Drake Boulevard. 
Rights-of-way are being acquired, relocations accomplished 
and cash contributions provided incrementally 
in advance of channel construction in 
individual reaches. 
Operations and results during fiscal year. New work: 
Engineering and design continued by hired labor. 
Under continuing contract, 59,304 cubic yards of 
excavation, 25,878 cubic yards of structural backfill 
and 3,663 tons of stone were placed and drainage 
structures completed to complete second-unit construction 
from Bon Air Road to College Avenue and 
Tamalpais Creek. By contract, environmental treatment 
planting initiated in this reach. Plans and 
specifications completed and continuing contract 
1034

SAN FRANCISCO, CALIF., DISTRICT 
awarded for third-unit construction from College 
Avenue to vicinity of Lagunitas Road. 
Condition at end of fiscalyear. Project construction below 
Sir Francis Drake Boulevard is about 59 percent 
complete. Work remaining is construction of unit to 
vicinity of Lagunitas Road, construction of fourth unit 
to Sir Francis Drake Boulevard and design and 
construction of project above Sir Francis Drake 
Boulevard. 
19. EEL RIVER, CALIF. 
Location. River drains an area of 3,630 square miles in 
Coast Range in northwestern California and flows into 
Pacific Ocean 15 miles south of Eureka, Calif., about 
215 miles north of San Francisco Bay. (See Geological 
Survey quadrangle, Fortuna.) 
Existing project. Provides for construction of earth 
levees and modification of existing levees in delta area 
below mile 15 on Eel River and below mile 4.15 on Salt 
River, riprapped as required, and for a boat-launching 
ramp and appurtenant facilities for recreational 
purposes. Approved estimated cost (1970) for work 
authorized by 1965 Act is $20,100,000. Cost of 
completed Sandy Prairie work was $874,000, of which 
$679,000 was Federal cost and $195,000 was contributed 
by local interests. (See table 34-B for authorizing 
legislation.) 
Local cooperation. Fully complied with for work 
performed. Total estimated cost for requirements for 
completed work, including non-Federal contributions, 
amounts to $200,000 (1959 price levels). Act of October 
27, 1965 requires local interests provide lands and 
rights-of-way, access road, and parking facilities 
adjacent to boat-launching ramp; hold the United 
States free from damages; maintain and operate 
project after completion, including recreation facilities; 
prevent encroachment on flood channels and ponding 
areas, and prevent unsupervised use of boat-launching 
area that would impair effectiveness of improvements; 
modify or relocate all utilities, roads, bridges, and 
approaches; adjust all claims regarding water rights. 
Act provides further that construction of boat-launching 
ramp should be concurrent with or subsequent to, 
and be independent of, construction of other project 
features when funds for that purpose are available and 
prescribed local cooperation therefor has been furnished. 
Humboldt County Board of Supervisors, by 
resolution dated December 17, 1963, indicated willingness 
and ability to meet requirements. In February 
1968, necessary flood plain zoning and management 
regulations were established. 
Operations and results during fiscal year. New work: As 
advance engineering and design for delta area levees, 
an economic reevaluation study was continued. 
Condition at end of fiscal year. About 4 miles of levee on 
right bank of Eel River at Sandy Prairie, completed in 
November 1959, prevented damages estimated at $300, 
000 during record floods of December 1964 and 
January 1965 which devastated Northern California. 
Damaged levee was repaired under emergency authority 
of Public Law 99, 84th Congress. Work 
remaining is completion of planning and construction 
of levees in delta area authorized by 1965 Flood 
Control Act. 
20. KLAMATH RIVER BASIN, CALIF. 
Location. Klamath River and tributaries drain an 
area of 15,800 square miles in south central Oregon 
and northwestern California and flow into Pacific 
Ocean 35 miles south of California-Oregon state line at 
Klamath, Del Norte County, California. Project 
encompasses lower 8.5 miles of Klamath River. (See 
U.S. Geological Survey quadrangle, Klamath.) 
Existing project. Provides for landside fill of approximately 
50 acres behind freeway constructed by 
State of California to provide a flood-free townsite at 
Klamath, construction of a levee at Klamath Glen 8, 
900 feet long to an average height of 25 feet, and 
management of about 2,200 acres of the remaining 
flood plain. Approved estimated cost for new work 
(1970) is $4,720,000. (See table 34-B for authorizing 
legislation.) 
Local cooperation. Local interests must provide lands 
and rights-of-way; hold the United States free from 
damages; adjust all claims regarding water rights 
arising from construction of the project; make alterations 
to existing improvements which may be 
required because of project; maintain and operate 
completed works; manage the historical flood plain 
within the 8.5 mile reach above the mouth of Klamath 
River; prevent encroachment on constructed works, 
ponding areas, and flood plain management areas and, 
if ponding or flood plain management is impaired, 
provide promptly without cost to the United States 
substitute storage or equivalent pumping capacity and 
such flood control works as required to protect the 
management areas. The Board of Supervisors of Del 
Norte County has furnished assurances of local 
cooperation by Resolutions Nos. 67-43 and 68-11, 
adopted April 24, 1967 and February 13, 1968, and 
established zoning to control development of the flood 
plain by Ordinances Nos. 66-4 and 66-5 adopted 
January 24, 1966. A Memorandum of Understanding 
was executed with the State of California Division of 
Highways regarding the combined freeway-flood 
protection project at Klamath and all requirements of 
cooperation for this portion of the project have been 
met. Land acquisition for Klamath Glen portion of the 
project essentially complete and plans completed by 
Del Norte County for road and airstrip relocation. 
Operations and results during fiscalyear. Engineering and 
design by hired labor including preparation of operation 
and maintenance manual for completed 
Klamath townsite and completion of plans and 
specifications for the Klamath Glen portion of the 
project. 
1035

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end offiscalyear. Klamath townsite portion 
of the project, initiated in April 1968, was completed in 
November 1968. Work remaining is construction of 
Klamath Glen levee. 
21. MAD RIVER BASIN, CALIF. 
Location. Mad River rises in Trinity County in 
northwestern California, flows northwesterly 80 miles 
and enters the Pacific Ocean about 4 miles north of 
Humboldt Bay. North Fork enters Mad River about 12 
miles above mouth near city of Blue Lake (See U.S. 
Geological Survey quadrangle, Blue Lake.) 
Existing project. Provides for approximately 8,000 feet 
of earthfill and riprapped levee to a maximum height 
of 11 feet along right bank of North Fork of Mad River 
at Blue Lake, and for a rockfill dam and reservoir at 
Butler Valley, 23 miles above the mouth of Mad River, 
to a height of 350 feet with a gross storage capacity of 
460,000 acre-feet. Approved estimated cost (1970) for 
Butler Valley Reservoir is $48,200,000, including 
ultimate recreational development, of which $24,500, 
000 is Federal cost and $23,700,000 is reimbursement 
by local interests to Federal Government for costs 
allocated to water supply storage and recreation. Cost 
of completed Blue Lake levee was $388,000. (See table 
34-B for authorizing legislation.) 
Local cooperation. Fully complied with for work 
performed. Total estimated cost for requirements for 
completed work amounts to $60,000 (prices as of dates 
of compliance). Local interests must maintain Blue 
Lake levee and prevent any encroachment which 
would interfere with proper functioning for flood 
control. Act of August 13, 1968 requires local interests 
adjust all claims concerning water rights arising from 
construction and operation of improvements, including 
acquisition of water rights needed for preservation of 
fish and wildlife resources affected by project; prevent 
encroachment in channel of Mad River which would 
interfere with proper functioning of improvements or 
lessen their beneficial effects, or reduce existing floodcarrying 
capacity; enter into a contract providing for 
reimbursement to the United States, in accordance 
with the Water Supply Act of 1958, as amended, for 
that part of construction cost and annual operation, 
maintenance, and major replacement costs allocated to 
municipal and industrial water supply; enter into a 
contract providing for reimbursement to the United 
States, in accordance with the Federal Water Project 
Recreation Act of 1965, for one-half the separable cost 
of recreation, and agree to operate, maintain, and 
make major replacements of recreation facilities 
provided. Humboldt County Board of Supervisors, by 
Resolution No. 67-108 dated 5 December 1967, 
,furnished assurances of cooperation in connection with 
recreation pursuant to requirements of Federal Water 
Project Recreation Act of 1965. By Resolution No. 182 
dated 14 December 1967, Humboldt Bay Municipal 
Water District furnished assurances of intent to adjust 
all claims concerning water rights arising from construction 
and operation of the works; enter into a 
contract for reimbursement of that portion of construction, 
operation and maintenance costs allocated to 
water supply, the operation and maintenance reimbursement 
to begin when such supply is first used, all in 
accordance with Water Supply Act of 1958; and to 
hold and save the United States free from damages due 
to construction and operation of the works related to 
water supply delivery. 
Operations and results during fiscal year. New work: 
Advance engineering and design for Butler Valley 
Dam and Reservoir initiated. 
Condition at end of fiscal year. Planning for Butler 
Valley Dam and Reservoir initiated in February 1970. 
Blue Lake levee, a small flood control project not 
specifically authorized by Congress (Sect. 205, Public 
Law 858, 80th Congress, as amended), was constructed 
in two increments. Strengthening and enlarging 2,300 
feet of existing levee and constructing about 3,000 feet 
of new levee to a maximum height of 7 feet was 
completed in 1955. Raising existing levees and constructing 
2,700 feet of new levee to a maximum height 
of 11 feet was completed in November 1963. 
22. NAPA RIVER BASIN, CALIF. 
Location. Napa River rises in St. Helena Mountains, 
flows southerly and empties into Mare Island Strait 
near Vallejo. (See U.S. Geological Survey quadrangles, 
Mare Island, Napa and Cutting Wharf.) 
Existing project. Provides for improvement of Napa 
River between Trancas Road and downstream end of 
Edgerley Island (11-mile reach) for flood control and 
recreation purposes by channel enlargement and 
realinement, construction of levees and floodwalls and 
boat-launching ramps and appurtenant recreation 
facilities. Approved estimated cost for new work (1970) 
is $21,860,000, of which $21,100,000 is Federal cost and 
$760,000 to be contributed by local interests for non- 
Federal share of recreational development. (See table 
34-B for authorizing legislation.) 
Local cooperation. Act of October 27, 1965, requires 
local interests provide lands and rights-of-way, including 
ponding, borrow, and spoil-disposal areas; 
hold the United States free from damages; make 
necessary modifications or relocations of utilities, 
highway bridges and approaches, and highways and 
roads, exclusive of railroad bridge and approaches; 
prevent encroachment on channel works and ponding 
areas which would interfere with proper functioning, 
and if ponding areas and capacities are impaired, 
provide substitute storage capacity or equivalent 
pumping capacity; adjust claims regarding water 
rights which might be affected by project; operate and 
maintain completed works and, with regard to recreational 
facilities, provide lands or rights in lands 
necessary to insure public control of recreational 
development; and where appraised value of such land 
1036

SAN FRANCISCO, CALIF., DISTRICT 
amounts to less than 50 percent of total first cost of 
recreational development, make additional contributions 
sufficient to bring non-Federal share to at 
least that level; operate and maintain boat-launching 
ramps, access roads, parking areas and necessary 
adjacent facilities for boat-launching ramps; and 
assure access to all on equal terms. By resolutions dated 
December 17, 1963 and October 28, 1969, Napa 
County Board of Supervisors furnished assurances of 
willingness and ability to meet requirements. Flood 
plain zoning ordinances have been adopted and 
appraisal of lands required for project purposes 
completed. 
Operations and results during fiscal year. New work: 
Advance engineering and design continued, including 
design alternatives required to coordinate project plans 
with a multiple-use linear park plan developed by local 
interests. 
Condition at end of fiscal year. Planning for project 
construction about 80 percent complete. 
23. PAJARO RIVER BASIN, CALIF. 
Location. Pajaro River and tributaries drain an area 
of 1,300 square miles in Coast Range and empty into 
Monterey Bay about 75 miles south of San Francisco. 
Pajaro Valley sub-basin in Santa Cruz and Monterey 
Counties includes 112 square miles in lower 13 miles of 
Pajaro River. (See U.S. Geological Survey quadrangles 
Capitola and San Juan Bautista.) 
Existing project. Provides for modification and extension 
of existing levee system on lower 12.5 miles of 
Pajaro River and lower 4.5 miles of Corralitos and 
Salsipuedes Creeks. Approved estimated Federal cost 
for new work (1970) is $17,600,000. Portion of project 
providing for enlarging and lengthening existing levee 
on Carnadero Creek in Santa Clara County is 
considered inactive and excluded from above. Estimated 
cost of this portion (1954) is $40,000. (See table 
34-B for authorizing legislation.) 
Local cooperation. Fully complied with for work 
performed. Requirements for Carnadero Creek levee 
under Act of December 22, 1944, have not been met. 
Act of November 7, 1966 requires local interests 
provide lands, rights-of-way, ponding, borrow, and 
spoil-disposal areas for construction; hold the United 
States free from damages; relocate pipelines, utilities, 
roads, bridges, and other facilities as necessary for 
construction; maintain and operate completed works; 
satisfy all claims concerning water rights arising from 
construction and operation of improvements; and 
prevent encroachment on constructed works and 
ponding areas and, if ponding areas are impaired, 
provide promptly without cost to the United States 
substitute storage or equivalent pumping capacity. 
Board of Supervisors of Monterey County Flood 
Control and Water Conservation District, by resolution 
adopted June 24, 1963, and Board of Directors 
of Pajaro Storm Drain Maintenance District o f Santa 
451-584 0-72-66 
Cruz County by Resolution 358-63 adopted June 24, 
1963, provided assurances of required cooperation for 
modification authorized by 1966 Flood Control Act. 
Counties of Monterey and Santa Cruz and City of 
Watsonville have enacted necessary flood plain zoning 
ordinances. 
Operations and results during fiscal year. Advance 
engineering and design continued for work authorized 
by 1966 Flood Control Act. 
Condition at end offiscalyear. Levees on Pajaro River to 
mile 11.8 and on Corralitos (Salsipuedes) Creek to mile 
2.4 completed in January 1949. Planning for levee 
modification and extension authorized by 1966 Flood 
Control Act is about 37 percent complete. 
24. REDWOOD CREEK, HUMBOLDT 
COUNTY, CALIF. 
Location. Drains an area of about 283 square miles in 
Coast Range of northwestern California and flows into 
Pacific Ocean about 50 miles south of California- 
Oregon boundary. (See Geological Survey quadrangle 
Orick.) 
Existing project. Provides for levees, interior drainage 
facilities, revetments, and channel rectification along 
lower 4 miles of Redwood Creek in vicinity of Orick, 
Calif. Cost of new work completed in October 1968 was 
$4,513,070. (See table 34-B for authorizing legislation.) 
Local cooperation. Fully complied with. Estimated costs 
for all requirements of local cooperation under terms of 
project authorization was $570,000. Local interests 
must maintain and operate works and prevent encroachment 
on flood channels and ponding areas 
which would decrease effectiveness of flood control 
improvements, and if ponding areas and capacities are 
impaired promptly provide substitute storage capacity 
or equivalent pumping capacity. 
Operations and results during fiscal year. An operation 
and maintenance manual was completed by hired 
labor. 
Condition at end of fiscal year. Project construction 
begun May 1966 was completed in October 1968. 
25. RUSSIAN RIVER BASIN, CALIF. 
Location. Russian River rises in Coast Range in 
northwestern California, flows southerly for 87 miles, 
and then turns westerly to flow for 23 miles to Pacific 
Ocean at Jenner, 60 miles northwest of San Francisco, 
Calif. (For general location see Geological Survey map 
for California.) 
Existing project. Authorized project provides foi 
construction of initial stage of a dam on East Fork of 
Russian River at Coyote Valley to a height of 160 feet; 
a dam on Dry Creek at Warm Springs to a height of 
319 feet; Knights Valley Reservoir formed by dams on 
Franz and Maacama Creeks to initial heights of 144 
feet and 224 feet, respectively, if constructed in three 
stages, or to ultimate heights of 339 feet and 389 feet 
37

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
respectively; and channel stabilization works on 
Russian River between mouth and mile 98, on lower 
reaches of several tributaries, and on Dry Creek 
downstream from dam. Coyote Valley Dam (Lake 
Mendocino), completed in 1959, is operated and 
maintained by the United States. (See tables 34-B, 34- 
F, and 34-G for authorizing legislation; latest approved 
estimated cost for new work; and details on project 
features and estimated costs.) 
Local cooperation. Fully complied with for Coyote 
Valley Dam and Reservoir and channel improvements 
accomplished to date. Responsible agencies in Sonoma 
and Mendocino Counties agreed that operating 
instructions for water conservation storage and releases 
will be issued by Sonoma County Flood Control and 
Water Conservation District. Total estimated costs for 
requirements under terms of Coyote Valley portion of 
project authorization, including a required non-Federal 
contribution of $5,598,000 in full payment of 
conservation benefits, are $5,838,000. In addition, local 
interests expended about $1 million to provide partial 
flood protection in area, constructed water distribution 
facilities at a cost of about $10 million, and plan to 
construct additional facilities in three stages at an 
estimated cost of $29 million. Local interests are 
required to hold the United States free from damages; 
maintain completed channel improvement works; 
prevent encroachment on channels which would 
interfere with proper functioning of project; adjust all 
claims concerning water rights arising from construction 
and operation of improvements, including 
acquisition of water rights needed for preservation of 
fish and wildlife resources affected by project; provide 
lands and rights-of-way for construction of channelimprovement 
works. Acts of October 23, 1962, and 
November 11, 1966, require local interests reimburse 
the United States for all costs allocated to water supply 
in accordance with Water Supply Act of 1958, as 
amended, such costs estimated at $23,900,000 for 
construction of Dry Creek (Warm Springs) and $207, 
500,000 for Knights Valley Reservoir in addition to 
annual costs for operation, maintenance and major 
replacements. Act of November 11, 1966 further 
requires, in accordance with the Federal Water 
Projects Recreation Act of 1965, that local interests 
pay, contribute in kind, or repay (which may be 
through user fees) with interest, one-half the separable 
cost of Knights Valley Reservoir project allocated to 
recreation and fish and wildlife, such cost currently 
estimated at $8,850,000 for three-stage construction; 
and bear all costs of operation, maintenance and 
replacement of recreation and fish and wildlife lands 
and facilities. Sonoma County Flood Control and 
Water Conservation District provided assurances of 
willingness and ability to meet requirements by 
Resolutions No. DR 00793-1, September 1961, and 
No. DR 4770-1, December 17, 1962, for Dry Creek 
(Warm Springs) and No. DR 8258-1, January 20, 1964 
and No. DR 16407, June 6, 1966, for Knights Valley 
Reservoir. Contract providing for reimbursement to 
the United States for Dry Creek (Warm Springs) costs 
allocated to water supply was executed and approved 
by the Secretary of the Army January 6, 1965. By letter 
dated March 7, 1967, Sonoma County Flood Control 
and Water Conservation District further indicated 
intent to support optimization of Dry Creek (Warm 
Springs) damsite to provide maximum storage for 
future water supply needs and to assume required 
financial obligation for such added water supply 
storage. 
Operations and results during fiscal year. New work: 
Engineering and design, construction of channel 
improvements on Russian River at one site in Sonoma 
County and three in Mendocino County, cost $139, 
945. Recreation facilities, Lake Mendocino, engineering 
and design for work to be accomplished in 
Area 4, cost $44,364. Dry Creek (Warm Springs) Dam 
and Reservoir engineering and design by hired labor, 
land acquisition continued; cemetery relocation initiated 
under a lump sum contract; drainage tunnel 
access initiated under a continuing contract; and a 
multiple-component continuing contract awarded for 
relocation of Rockpile Road Unit No. 1 and Warm 
Springs Bridge substructure, and for random embankment 
fill; cost $1,196,346. Maintenance: Operation 
and maintenance, Coyote Valley Dam and 
Reservoir, including recreation facilities, and condition 
and operation studies by hired labor. 
Condition at end offiscalyear. Entire project, exclusive of 
recreation facilities at completed project (Lake Mendocino), 
is about 9 percent complete. Work remaining 
is construction of additional channel improvements on 
Russian River, construction of Dry Creek (Warm 
Springs) Dam and Reservoir, channel improvements 
on Dry Creek, and Knights Valley Reservoir. Channel 
improvements on Russian River are about 54 percent 
complete; Dry Creek (Warm Springs) portion of 
project is about 9 percent complete. No work accomplished 
on Knights Valley Reservoir portion of 
project. Flow regulation of Coyote Valley Reservoir 
was initiated November 1958 and dam and appurtenant 
works were essentially completed April 
1959. Relocated State Highway 20 was opened to 
traffic in June 1958, and all work, including removal of 
slides resulting from severe storms in 1958, was 
completed in April 1959. An initial 4-mile test section 
of bank-stabilization work on Russian River near 
Geyserville was completed in February 1957. Channel 
improvements in additional reaches on Russian River 
and on East Fork of Russian River were completed in 
1962, 1963, 1964, 1967, 1968, 1969 and 1970. 
26. SONOMA CREEK, CALIF. 
Location. Drains an area of about 160 square miles in 
eastern Sonoma County, Calif., and discharges into 
San Pablo Bay, the northerly arm of San Francisco 
1038

SAN FRANCISCO, CALIF., DISTRICT 
Bay. (See U.S. Geological Survey quadrangles Mare 
Island and Sears Point.) 
Existing project. Channel improvements in lower 15 
miles of Sonoma Creek by channel enlargement and 
levees in lower reaches, riprapped trapezoidal earth 
channel in upper reaches, interior drainage facilities, 
and bridge modifications. Approved estimated Federal 
cost of new work (1970) is $13,800,000. (See table 34-B 
for authorizing legislation.) 
Local cooperation. Local interests must provide lands, 
rights-of-way, ponding, borrow, and spoil-disposal 
areas for construction; hold the United States free from 
damages; provide modifications or relocations of 
bridges and approaches (except railroad bridges and 
their approaches), and all utilities as necessary for 
construction; maintain and operate completed works; 
prevent encroachment on flood channels and ponding 
areas and, if capacity of ponding areas is impaired, 
provide promptly without cost to the United States 
substitute storage or pumping capacity of equal 
effectiveness; adjust all claims concerning water rights 
arising from construction and operation of the improvement; 
and strengthen and maintain those local 
levee sections on tributaries which will be retained in 
effect as extensions of the Federal levees to such 
standards as may be required by the Chief of Engineers 
to assure the degree of protection contemplated for the 
Federal project. The Board of Directors of Sonoma 
County Water Agency (formerly Flood Control and 
Water Conservation District), by Resolutions No. DR 
7223-1 adopted September 24, 1963, and DR 28152 
adopted December 22, 1969, provided assurances of 
local cooperation. Required flood plain zoning ordinances 
have been enacted. 
Operations and results during fiscal year. Advance 
engineering and design continued. 
Condition at end of fiscal year. Advance planning for 
project construction is about 33 percent complete. 
27. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Section 3, Flood Control Act of June 22, 1936, as 
amended and supplemented, included requirement 
that local interests maintain and operate completed 
flood control works in accordance with regulations 
prescribed by the Secretary of War. Inspections made 
throughout the year to determine effectiveness of 
operation and maintenance by local interests of 
completed local protection projects and works constructed 
under emergency and special authorities of 
Sections 205 and 208 of the 1948 Flood Control Act, 
Section 14 of the 1946 Flood Control Act, and Public 
Law 99, 84th Congress. Fiscal year cost $27,998. Total 
cost to June 30, 1970 was $97,966. 
28. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 34-H. 
29. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood Control activities pursuant to Section 205, Public Law 
858, 80th Congress, as amended (preauthorization) 
Fiscal year costs for preauthorization studies were 
$8,478 Crescent City (Tsunami), Del Norte County, 
Calif.; and $10,029 San Leandro Creek, Alameda 
County, Calif. 
Emergency flood control activities - repair, flood fighting and 
rescue work (Public Law 99, 84th Congress, and antecedent 
legislation) 
Federal cost was $2,200,626, of which $40,392 was 
for advance preparation, $395,057 for flood emergency 
operations and post-flood reports, and $1,765,177 for 
repair and restoration. 
GENERAL INVESTIGATIONS 
30. SURVEYS 
See table 34-I. 
31. COLLECTION AND STUDY OF BASIC 
DATA 
During fiscal year, flood plain management service 
program continued. Information studies on communities 
of Phillipsville-Garberville, South Fork Eel 
River, and Coyote Creek (Upper and Lower), Santa 
Clara County, completed; studies of Lake Talawa, Del 
Norte County, and Pepperwood-Holmes-Shively, Eel 
River, essentially completed. Fiscal year cost $134,637. 
(See table 34-J for completed flood plain studies.) 
32. RESEARCH AND DEVELOPMENT 
During fiscal year, hired labor costs of $6,549 were 
incurred 
1039

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 34-A 
See 
Section 
in Text Project 
1. Crescent City 
Harbor, Calif. 
2. Humboldt Harbor 
and Bay, Calif. 
3. Monterey Harbor 
Calif. 
4. Noyo River and 
Harbor, Calif. 
5. Oakland Harbor, 
Calif. 
6. Redwood City 
Harbor, Calif. 
7. Richmond Harbor, 
Calif. 
8. San Francisco 
Harbor, Calif. 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
$ - $ - $ - 
367 
417,500 
413,097 
91,000 
65,166 
-10,000 
36,542 
112,500 
86,966 
405,000 
57,094 
480,000 
461,077 
116,000 
115,990 
176,700 
177,125 
60,000 
158,317 
340,000 
348,013 
750 
407,719 
383,680 
59,630 
3,106 
-15,844 
4,595 
-633,149 
36,745 
234,700 
277,650 
121,368 
121,148 
191,200 
168,386 
-5,311 
355,000 
356,160 
750 
360,000 
386,004 
13,018 
893 
50,000 
15,172 
49,922 
319,100 
296,367 
155,000 
154,462 
95,000 
114,271 
- 
445,000 
438,408 
$ 25,000 $ 6,073,6721 
9,034 6,057,7061 
- 2,586,4592,3 
- 2,586,4592,3 
- 5 4,000 - 525,000 
- 5,545,076 s 
- 5,545,076 s 
3,019,297 15,772,0166,7 
463,469 13,211,0316,7 
- 1,033,1828 
731 1,033,182 
- 81,6099 
81,6099 
- 473,8191100 
39 462,9711 
180,801 1,250,554 1,12 
185,010 1,214,68011,12 
- 222,81013 
- 222,810 
100,000 5,928,11414 
43,585 5,775,27114 
172,208 10,367,0731s,16 
191,473 10,361,72715 
, 1 6 
- 1,672,72217 
- 1,672,72217 
140,075 2,342,52418 
141,205 2,342,461 
- 2,886,69519,20,21 
- 2,886,69519,20,21 
114,195 4,073,9642223 
116,899 4,073,12522,23 
- 164,689 
- 164,689 
- 2,689,35621 
- 2,689,35621 
284,456 6,141,0312s,26 
285,570 6,134,7492s,26 
1040

TABLE 34-A (Cont'd) 
See 
Section 
in Text Project 
9. San Francisco 
Harbor and Bay 
(Removal of Drift) 
10. San Pablo Bay 
and Mare Island 
Strait, Calif. 
11. San Rafael 
Creek, Calif. 
12. Santa Cruz 
Harbor, Calif. 
17. Alameda Creek, 
Calif. 
18. Corte Madera 
Creek, Calif. 
(Federal Funds) 
(Contrib. Funds) 
19. Eel River, Calif. 
SAN FRANCISCO, CALIF., DISTRICT 
COST AND FINANCIAL STATEMENT 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
20. Klamath River, New Work 
Calif. Approp. 
Cost 
21. Mad River Basin, New Work 
Calif. Approp. 
Cost 
22. Napa River Basin, New Work 
Calif. Approp. 
Cost 
23. Pajaro River Basin, New Work 
Calif. Approp. 
Cost 
24. Redwood Creek, New Work 
Humboldt County, Approp. 
Calif. Cost 
25. Russian River Basin, 
Calif: - 
Coyote Valley Dam New Work 
and Reservoir (Lake Approp. 
Mendocino) and Cost 
Channel Improvements Maint 
Approp. 
Cost 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
440,000 
443,139 
295,000 
295,840 
17,782 
120,000 
182,642 
2,990,000 
3,014,666 
145,000 
220,037 
150,000 
73,997 
490,000 
488,349 
390,735 
390,167 
-64,809 
2,997 
118,311 
132,408 
3,985,000 
3,898,124 
426,000 
776,515 
11,300 
5,300 
250,000 
305,188 
675,000 
583,354 
495,000 
492,924 
490,000 
489,286 
200,000 
16,458 
2,277 
125,000. 
119,712 
3,055,000 
3,091,244 
1,395,775 
1,587,573 
20,800 
22,000 
194,000 
129,714 
1,330,000 
1,076,957 
100,000 300,000 364,000 
85,263 209,410 266,950 
- - 194,000 
- - 80,745 
1,556,000 2,000,000 463,225 
1,654,954 1,921,911 503,222 
100,000 
66,218 
285,500 
285,675 
100,000 
118,653 
315,700 
313,576 
116,000 
63,759 
420,750 
412,935 
$ - 
975,515 
662,927 
425,866 
424,553 
25,055 
201,000 
260,000 
795 
211,148 
199,570 
2,530,000 
2,587,844 
1,526,000 
1,496,938 
23,534 
23,534 
44,809 
447,000 
130,913 
220,000 
193,081 
50,000 
191,265 
200,000 
215,254 
-41,000 
6,427 
100,000 
139,945 
686,496 
635,732 
5,256,582 
4,937,512 
1,369,37221,27 
1,369,37221, 
2 7 
11,744,23328,29 
11,741,39028, 
29 
32,35930 
32,359 
848,18731 
840,59031 
1,860,191 
1,537,390 
809,459 
791,957 
15,415,000 
15,414,399 
4,403,775 
4,374,208 
50,834 
50,834 
1,272,81633 
1,232,52433 
2,452,000 
1,791,224 
607,7613 
580,842 
814,000 
752,888 
1,142,283 
1,044,282 
4,513,225 
4,513,070 
13,774,96935,36 
13,744,3583s,37 
2,909,716 
2,840,625 
1041

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 34-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
Dry Creek (Warm New Work 
Springs) Dam and Approp. $ 1,800,000 $ 1,814,000 $ 1,240,000 $ 1,352,000 $ 7,806,000 
Reservoir and Cost 1,210,159 2,448,012 1,365,986 1,196,346 7,545,353 
Channel Improvements 
26. Sonoma Creek, New Work 
Calif. Approp. - - 97,000 323,000 420,000 
Cost - - 61,858 218,942 280,800 
1. Excludes contributed funds of $217,116 and $2,138 
surplus material from Corps military activities. 
2. Excludes contributed funds of $27,884. 
3. Includes $22,316 for reconnaissance and condition surveys, 
Code 470 Project Condition Surveys, FY 1956-1970. 
4. Excludes $2,000 contributed funds in lieu of royalty-free 
rock. 
5. Includes $2,261,371 for previous project. Excludes 
$95,000 contributed funds for existing project. 
6. Includes $98,206 for previous project. 
7. Includes $1,641 for reconnaissance and condition surveys, 
Code 470 Project Condition Surveys, FY 1956-1970. 
8. Includes $207,800 Public Works Administration funds. 
9. Includes $3,770 for reconnaissance and condition surveys, 
Code 470 Project Condition Surveys, FY 1956-1970. 
10. Includes $11,985 for previous project. Excludes contributed 
funds of $7,180 for previous project. 
11. Includes $32,097 for previous project. Excludes contributed 
funds of $820 for previous project. 
12. Includes $15,436 for reconnaissance and condition surveys, 
Code 470 Project Condition Surveys, FY 1956-1970. 
13. Excludes contributed funds of $1,700. 
14. Includes $2,899,232 for previous projects. Excludes 
$83,547 contributed funds on existing project. 
15. Includes $684,028 for previous projects. 
16. Includes $501 for reconnaissance and condition surveys, 
Code 470 Project Condition Surveys, FY 1956-1970. 
17. Includes $31,443 for previous projects. Excludes 
$119,572 contributed funds for existing project. 
18. Includes $458 for reconnaissance and condition surveys, 
Code 470 Project Condition Surveys, FY 1956-1970. 
19. Excludes contributed funds of $524,778. 
20. Includes $105,000 Public Works Administration funds. 
21. Excludes modification authorized October 27, 1965, 
under project "San Francisco Bay to Stockton, Calif. (John F. 
Baldwin and Stockton Ship Channels)". 
22. Excludes $34,800 contributed funds. 
23. Includes $3,138 for reconnaissance and condition surveys, 
Code 470 Project Condition Surveys, FY 1956-1970. 
24. Includes $1,030,399 for previous projects. Excludes 
$134,591 contributed funds for existing project. 
25. Includes $475,321 for previous projects. 
26. Includes $3,384 for reconnaissance and condition surveys, 
Code 470 Project Condition Surveys, FY 1956-1970. 
27. Includes $1,086,703 for previous projects. 
28. Includes $1,359,380 for previous projects. 
29. Includes $904 for reconnaissance and condition surveys, 
Code 470 Project Condition Surveys, FY 1956-1970. 
30. Excludes $41,094 contributed funds. 
31. Includes $41,740 for reconnaissance and condition surveys, 
Code 470 Project Condition Surveys, FY 1956-1970. 
32. Excludes $810,046 contributed funds. 
33. Excludes $194,821 contributed funds. 
34. Includes $225,000 applicable to Public Works Acceleration 
Program, Blue Lake levee. 
35. Excludes $5,598,000 contributed funds and $400,000 for 
recreation facilities at completed projects funded under Public 
Works Acceleration Program. 
36. Excludes $714,000 for recreation facilities at completed 
projects funded under Code 711. 
37. Excludes $665,951 for recreation facilities at completed 
projects funded under Code 711. 
1042

SAN FRANCISCO, CALIF., DISTRICT 
AUTHORIZING LEGISLATION 
Work Authorized 
July 18, 1918 
Sept. 22, 1922 
Jan. 21, 1927 
Aug. 30, 1935 
Aug. 26, 1937 
Mar. 2, 1945 
Mar. 2, 1945 
Oct. 27, 1965 
June 25, 1910 
July 3, 1930 
Aug. 30, 1935 
Aug. 26, 1937 
July 16, 1952 
Aug. 13, 1968 
CRESCENT CITY HARBOR, CALIF. (See Section 1 of Text) 
Breakwater. 
Conditions of local cooperation modified. 
Extend breakwater to 3,000 feet long. 
Dredge harbor basin, 1,800 feet long, 1,400 feet wide, and 
20 feet deep. 
Sand barrier and maintenance dredging in vicinity of seaward 
end thereof. 
Extend breakwater to Round Rock (modified by Chief of 
Engineers). 
Inner breakwater and removal of rock in inner harbor. 
Extend inner breakwater 300 feet and dredge T-shaped basin 
20 feet deep. 
HUMBOLDT HARBOR AND BAY, CALIF. (See Section 2 of Text) 
Rebuilding the jetties. 
Depth of 20 feet and widths of 250 and 300 feet in bay 
channels and for channel to Arcata Wharf. 
Entrance channel, 500 feet wide, 30 feet deep. 
Widths of 400 feet in Eureka Channel and 300 feet in Samoa and 
Fields Landing Channels, and construct Fields Landing Turning 
Basin, 600 feet wide and 800 feet long, all to a depth of 26 
feet. 
Deepen to 40 feet and widen bar and entrance channel; deepen 
Eureka and Samoa Channels to 30 feet; and construct North 
Bay Channel, 400 feet wide, 30 feet deep. 
Deepen to 35 feet North Bay and Samoa Channels and outer reach 
of Eureka Channel (miles 4.29 to 5.00); widen bends, miles 
0.75 and 2.6; and construct North Bay anchorage area 35 feet 
deep. 
MONTEREY HARBOR, CALIF. (See Section 3 of Text) 
West breakwater, 1,300 feet long. 
Extend Breakwater to 1,700 feet long. 
Harbor depth of 8 feet. 
East breakwater 1,100 feet long; detached north breakwater 
3,300 feet long, as modified by the Chief of Engineers. 
Eliminate sand trap and uncompleted dredging authorized by 
Act of Mar. 2, 1945. (Maintenance dredging to be eliminated 
upon completion of breakwaters.) 
NOYO RIVER AND HARBOR, CALIF. (See Section 4 of Text) 
Entrance channel, jetties, and channel in river. 
South breakwater in Noyo Harbor.3 
Mooring basin in lieu of channel extension authorized by Act 
of June 30, 1948.4 
North Breakwater in Noyo Harbor. 3 
OAKLAND HARBOR, CALIF. (See Section 5 of Text) 
Jetties. 
North channel in Brooklyn Basin, 25 feet deep, and tidal canal 
to 18 feet. 
Rivers and Harbors Committee 
Doc. 12, 71st Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 45, 72nd Cong., 1st sess. 
H. Doc. 266, 76th Cong., 1st sess. 
H. Doc. 219, 86th Cong., 1st sess. 1 
S. Doc. 156, 71st Cong., 2nd sess. 
H. Doc. 682, 76th Cong., 3rd sess. 
H. Doc. 289, 86th Cong., 2nd sess. 
S. Doc. 121, 87th Cong., 2nd sess.l 
Annual Report, Part II, 1874, 
p. 378. 
H. Doc. 647, 61st Cong., 2nd sess. 
1043 
TABLE 34-B 
Acts Documents 
H. Doc. 434, 64th Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 4, 67th Cong., 2nd sess. 
H. Doc. 595, 69th Cong., 2nd sess. 
Rivers and Harbors Committee 
Doc. 40, 74th Cong., 1st sess. 
S. Commerce Committee print, 
75th Cong., 1st sess. 
H. Doc. 688, 76th Cong., 3rd sess. 
Report on file in Office, Chief 
of Engineers. 
H. Doc. 264, 89th Cong. l 
H. Doc. 950, 60th Cong., 1st sess. 
H. Doc. 755, 69th Cong., 2nd sess. 
Rivers and Harbors Committee 
Doc. 14, 74th Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 11, 75th Cong., 1st sess. 
H. Doc. 143, 82nd Cong., 1st sess. 
H. Doc. 330, 90th Cong., 2nd sess. l 
July 3, 1930 
Aug. 30, 19352 
Mar. 2, 1945 
July 14, 1960 
July 3, 1930 
Mar. 2, 1945 
July 14, 1960 
Oct. 23, 1962 
June 23, 1874 
June 25, 1910

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 34-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Sept. 22, 1922 H. Doc. 144, 67th Cong., 2nd sess. 
Jan. 21, 1927 
Apr. 28, 1928 
July 3, 1930 
Mar. 2, 1945 
Mar. 2, 1945 
Oct. 23, 19626 
June 25, 1910 
July 3, 1930 
Aug. 30, 1935 
Mar. 2, 1945 
May 17, 1950 
Aug. 8, 1917 
July 3, 1930 
Aug. 30, 19357 
June 20, 1938 
Mar. 2, 1945 
Sept. 3, 1954 
1044 
Channel across shoal southeast of Yerba Buena Island and thence 
to Webster St.; South channel in Brooklyn Basin; Turning 
Basin at east end of Brooklyn Basin; and channel in Tidal 
Canal from Brooklyn Basin to Park St., 30 feet deep. 
Channel from Webster St. to Brooklyn Basin, maintain area to 
within 75 feet of pierhead line south of channel from 
Harrison St. to Harbor Line Point 119 in Brooklyn Basin; 
dredge a triangular strip about 2,700 feet long and maximum 
width of 300 feet at western end of Brooklyn Basin, 30 feet 
deep. 
Local cooperation requirements modified to provide alteration 
or replacement of bridges by local interests shall apply only 
to that feature of project covering deepening tidal canal to 
25 feet. 
Drawbridges across Tidal Canal were required by 1882 Decree of 
Court in condemnation proceedings whereby title was obtained 
to right-of-way for tidal canal. 
Entrance channel to outer harbor, 800 to 600 feet wide. 
Eliminated requirement that local interests contribute 10 cents 
per cubic yard toward deepening tidal canal. 
Maintenance of 35-foot depth in channel to outer harbor and in 
outer harbor channel and turning basin. 
Deepen inner harbor 30-foot channels and lower 1,300 feet of 
north channel in Brooklyn Basin to 35 feet. 
REDWOOD CITY HARBOR, CALIF. (See Section 6 of Text) 
A 5-foot channel to Steinberger Slough. 
A 20-foot channel to West Point Slough. 
A 27-foot channel to West Point Slough and a turning basin 27 
feet deep, 1,800 feet long, and 700 feet wide. 
A 30-foot channel across San Bruno Shoal and enlarge and 
deepen 27-foot channel and turning basin in Redwood Creek to 
30 feet. 
Extend 30-foot channel 1,300 feet upstream and provide a 
second turning basin 30 feet deep, 900 feet wide, and 1,700 
feet long at junction of Redwood Creek and Boundary Slough. 
Project name changed from Redwood Creek, Calif., to Redwood 
City Harbor, Calif. 
RICHMOND HARBOR, CALIF. (See Section 7 of Text) 
Channel 24 feet deep and 600 feet wide from San Francisco Bay 
to Ellis Slough (Santa Fe Channel); a turning basin at Point 
Potrero; a training wall. 
A 30-foot channel with lessened widths; a turning basin at 
head of navigation. 
Increase project widths in inner harbor, maintenance of Santa 
Fe channel to 30 feet; approach areas in outer harbor to 32 
feet. 
Widen channel at Point Potrero and north thereof; enlarge and 
maintain to 30-foot depth turning basin at Terminal No. 1. 
Channel 20 feet deep, 150 feet wide, in San Pablo Bay north of 
Point San Pablo. 
Channel 35 feet deep and 600 feet wide adjacent to Southampton 
Shoal; enlarge and deepen to 35 feet approach area to Richmond 
Long Wharf; widen and deepen inner harbor and entrance 
channels; deepen turning basin at Point Richmond and southerly 
2,000 feet of Santa Fe Channel. Eliminate restriction that 
widening north of Point Potrero will not be undertaken until 
local interests furnish assurances industries will avail 
themselves of improved navigation facilities. 
H. Doc. 407, 69th Cong., 1st sess.1 ,s 
Public Res. 28, 70th Cong. 
Rivers and Harbors Committee 
Doc. 43, 71st Cong., 2nd sess. 
H. Doc. 466, 77th Cong., Ist sess. 
Report on File in Office, Chief 
of Engineers. 
H. Doc. 353, 87th Cong., 2nd sess. 1 
H. Doc. 307, 61st Cong., 2nd sess. 
H. Doc. 142, 70th Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 10, 73rd Cong., 1st sess. 
H. Doc. 94, 79th Cong., 1st sess. 
H. Doc. 104, 81st Cong., 1st sess.l 
H. Doc. 515, 63rd Cong., 2nd seas. 
Rivers and Harbors Committee 
Doc. 16, 70th Cong., 1st seas. 
Rivers and Harbors Committee 
Docs. 7, 73rd Cong., 1st sess. 
and 10, 74th Cong., 1st seas. 
H. Doc. 598, 75th Cong., 3rd seas. 
H. Doc. 715, 76th Cong., 3rd seas. 
H. Doc. 395, 83rd Cong., 2nd seas.

SAN FRANCISCO, CALIF., DISTRICT 
TABLE 34-B (Cont'd) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
Oct. 27, 1965 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 19357 
Aug. 26, 1937 
Oct. 27, 1965 
H. Doc. 208, 89th Cong., 1st sess. l 
H. Doc. 337, 69th Cong., 1st sess. 
H. Doc. 196, 70th Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 50, 72nd Cong., 2nd sess. 1 
Rivers and Harbors Committee 
Doc. 12, 75th Cong., 1st sess. 1 
H. Doc. 208, 89th Cong., 1st sess. 1 
West Richmond channel 45 feet deep, 600 feet wide; enlarge and 
deepen to 45 feet maneuvering area at Richmond Long Wharf 
(Sacramento Dist. "San Francisco Bay to Stockton, Calif. 
(John F. Baldwin and Stockton Ship Channels)"). 
SAN FRANCISCO HARBOR, CALIF. (See Section 8 of Text) 
Dredging at Islais Creek. 
Remove Presidio Shoal, Rincon Reef Rock (Inner), Rincon Reef 
Rock (Outer), Blossom Rock, and Alcatraz Shoal to 40 feet 
deep, mean lower low water; remove Arch Rock, Shag Rocks 1 
and 2, and Harding Rock to 35 feet deep; remove Racoon Shoal 
and Point Knox Shoal westward of a north-and-south line 
through Point Stuart Light to 35 feet deep; for a bar main 
ship channel 45 feet deep and 2,000 feet wide. 
A 50-foot depth in bar main ship channel, 2,000 feet wide, 
remove Black Point Shoal to 40 feet deep and cE tain 
modifications of areas to be deepened on Alcatraz and Islais 
Creek Shoals and abandon 34-foot depth area south of flared 
approach channel to Islais Creek. 
Channel to San Francisco Airport 750 feet wide and 10 feet deep 
ending in a basin 2,000 feet wide. 
A 55-foot depth in bar main ship channel, 2,000 feet wide 
(Sacramento Dist. "San Francisco Bay to Stockton, Calif. 
(John F. Baldwin and Stockton Ship Channels)"). Eliminates 
uncompleted removal of Racoon Shoal to 35-foot depth. 
SAN FRANCISCO HARBOR AND BAY, CALIF. (See Section 9 of Text) 
Drift removal. 
SAN PABLO BAY AND MARE ISLAND STRAIT, CALIF. (See Section 10 
of Text) 
Pinole Shoal Channel 35 feet deep, 600 feet wide, 7.6 miles 
long; Mare Island Strait channel 30 feet deep, 600 feet wide 
with turning basin 1,000 feet wide. 
Increase width of channel in Mare Island Strait to 700 feet and 
increase length of turning basin. 
Maintain approach areas to Navy Yard Piers at south end of Mare 
Island. 
A 45-foot depth in Pinole Shoal channel, 600 feet wide, 11 
miles long; maneuvering area at Oleum Pier 45 feet deep 
(Sacramento Dist. "San Francisco Bay to Stockton, Calif. 
(John F. Baldwin and Stockton Ship Channels)"). 
SAN RAFAEL CREEK, CALIF. (See Section 11 of Text) 
An 8-foot channel across flats in San Francisco Bay; a 6-foot 
channel in creek; a turning basin. 
SANTA CRUZ HARBOR, CALIF. (See Section 12 of Text) 
Entrance channel, jetties, harbor channel, turning basin and 
sand bypass plant, as modified by Chief of Engineers. 
ALAMEDA CREEK, CALIF. (See Section 17 of Text) 
Levees, channel improvements and recreation facilities in 
Alameda Creek Coastal Plain, as modified by Chief of 
Engineers; Federal participation in cost of Del Valle 
Reservoir on Arroyo del Valle. 
CORTE MADERA CREEK, CALIF. (See Section 18 of Text) 
Levees and channel improvements, lower 11 miles of Corte 
Madera Creek and tributaries, as modified by Chief of 
Engineers. 
Local cooperation requirements modified to provide 1.5 percent 
cash contribution toward cost of Ross Valley unit. 
1045 
Documents 
H. Doc. 268, 81st Cong., 1st sess. 
H. Doc. 104, 69th Cong., 1st sess. 
H. Doc. 644, 75th Cong., 3rd sess. 
H. Doc. 217, 77th Cong., 1st sess. 
H. Doc. 208, 89th Cong., 1st sess. 1 
H. Doc. 801, 63rd Cong., 2nd sess. 
(no map published). 
H. Doc. 357, 85th Cong., 2nd sess. 1 
S. Doc. 128, 87th Cong., 2nd sess.I 
H. Doc. 545, 87th Cong., 2nd sess.1 
Sect. 205, 1966 Flood Control Act. 
May 17, 1950 
Jan. 21, 1927 
June 20, 1938 
Mar. 2, 1945 
Oct. 27, 1965 
Mar. 2, 1919 
July 3, 1958 
Oct. 23, 1962 
Oct. 23, 1962 
Nov. 7, 1966

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 34-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 3, 1958 
Oct. 27, 1965 
Nov. 7, 1966 
June 30, 19489 
Aug. 13, 1968 
Dec. 22, 1944 
Dec. 22, 1944 
Nov. 7, 1966 
EEL RIVER, CALIF. (See Section 19 of Text) 
Levee and bank stabilization in Sandy Prairie area, as 
modified by Chief of Engineers. 
Delta area levees and boat-launching ramp (in lieu of current 
retards and levees authorized by Act of June 22, 1936). 
KLAMATH RIVER BASIN, CALIF. (See Section 20 of Text) 
Klamath townsite fill; Klamath Glen levee. 
MAD RIVER BASIN, CALIF. (See Section 21 of Text) 
Levee, North Fork Mad River a~t Blue Lake. 
Butler Valley Dam and Reservoir. 
NAPA RIVE 
NAPA RIVER BASIN, CALIF. (See Section 22 of Text) 
Levees, channel improvements and recreation facilities between 
Trancas Road and Edgerly Island (1 1-mile reach). 
PAJARO RIVER BASIN, CALIF. (See Section 23 of Text) 
Levees, Pajaro River mouth to mile 11.8; Corralitos 
(Salsipuedes) Creek to mile 2.6. 
Levee modification and extension, Pajaro River mouth to mile 
12.5. Corralitos (Salsipuedes) Creek to mile 4.5. 
REDWOOD CREEK, HUMBOLDT COUNTY, CALIF. (See Section 24 of 
Text) 
Levees, channel improvements in vicinity of Orick, as 
modified by Chief of Engineers. 
RUSSIAN RIVER BASIN, CALIF. (See Section 25 of Text) 
Coyote Valley Dam and Reservoir (Lake Mendocino); Channel 
improvements on lower 98 miles of Russian River and lower 
reaches of tributaries. 
Increased appropriation authorization for initial stage of 
project development. 
Dry Creek (Warm Springs) Dam and Reservoir; Channel Improvements 
on Dry Creek below dam. 
Knights Valley Reservoir (Franz and Maacama Dams). 
SONOMA CREEK, CALIF. (See Section 26 of Text) 
Levees and channel improvements, lower 15 miles. 
1. Contains latest published map. 
2. Previously authorized Public Works Administration program, 
Sept. 6, 1933. 
3. Inactive. Requires determination by Area Redevelopment 
Administration that improvement is essential to its program for 
redeveloping the area. 
4. A 400-foot channel extension, mooring basin and connecting 
channel constructed by Noyo Harbor District. The 
channel extension to be maintained by the Federal Government. 
5. Included deepening of tidal canal above Park Street 
Bridge to 25 feet, which is being restudied. 
6. Included Federal participation in reconstruction of Fruitvale 
Avenue Highway Bridge (S. Doc. 75, 87th Cong., 2nd Sess.) 
which is being restudied with Operation and Maintenance funds. 
7. Included in part in Public Works Administration Program, 
Sept. 6, 1933. 
8. Included dredging two approach areas at Vallejo and 
South Vallejo, which is considered inactive. 
9. Section 205, P.L. 858, 80th Congress, as amended. 
10. Included levee on Carnadero Creek which is considered 
inactive. 
1046 
H. Doc. 80, 85th Cong., 1st sess. 
H. Doc. 234, 89th Cong., 1st sess.1 
H. Doc. 478, 89th Cong., 2nd sess. 1 
Reports on file in Office, Chief 
of Engineers. 
H. Doc. 359, 90th Cong., 2nd sess.1 
H. Doc. 222, 89th Cong., 1st sess. 
H. Doc. 505, 78th Cong., 2nd sess.10 
H. Doc. 91, 89th Cong., 2nd sess. 1 
H. Doc. 497, 87th Cong., 2nd sess.1 
H. Doc. 585, 81st Cong., 2nd sess. 
Public Law 404, 84th Cong., 2nd 
sess. 
H. Doc. 547, 87th Cong., 2nd sess. 
H. Doc. 518, 89th Cong., 2nd sess. 1 
H. Doc. 224, 89th Cong., 1st sess.1 
Oct. 23, 1962 
May 17, 1950 
Feb. 10, 1956 
Oct. 23, 1962 
Nov. 11, 1966 
Oct. 27, 1965

SAN FRANCISCO, CALIF., DISTRICT 
TABLE 34-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Berkeley Harbor, Calif.1 1966 $ 155,5502 $ - 
Bodega Bay, Calif. 1969 641,8003 251,986 
Halfmoon Bay Harbor, Calif.4 1967 6,697,3965 100,000 
Lower San Francisco Bay, Calif. (Inactive) 1935 
Moss Landing Harbor, Calif.4 1968 338,2156 1,344,3667 
Napa River, Calif: 
Channel4 1963 1,021,2748 476,2458 
Dikes and Revetments (Inactive) 1963 
Petaluma River, Calif.4 1969 85,0638 1,534,5538 
1. Authorized by Chief of Engineers (Sect. 107, Public Law 5. Excludes $100,000 contributed funds. 
86-645). Completed October 1965. 6. Excludes $5,337 surplus material from Corps military 
2. Excludes $155,551 contributed funds. activities. 
3. Excludes $399,779 for major rehabilitation; $397,779 7. Excludes $8,539 surplus material from Corps military 
Federal funds and $2,000 contributed funds. activities. 
4. Completed. 8. Excludes previous project costs. 
TABLE 34-D NAVIGATION WORK UNDER SPECIAL AUTHORIZATION 
Navigation Activities Pursuant To Section 107, P.L. 86-645 (Preauthorization) 
(See Section 15 of Text) 
Study Identification Fiscal Year Costs 
Arcata Small Craft Harbor, Humboldt County, Calif. $ 8,000 
Coyote Point Marina, San Mateo County, Calif. 12,069 
Gallinas Creek, Marin County, Calif. 0 
Klamath River, Del Norte County, Calif. 2,500 
Mountain View Marina, Santa Clara County, Calif. 5,933 
Palo Alto Yacht Harbor, Santa Clara County, Calif. 5,865 
San Francisco Marina (East Harbor Facility), Calif. 5,856 
San Francisco Marina (West Harbor Facility), Calif. 1,288 
San Francisco Harbor (Islais Creek, Calif.) 36 
Santa Cruz Harbor Extension, Calif. 7,226 
Saucelito Canal, Marin County, Calif. 3,027 
Total $51,800 
TABLE 34-E OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Humboldt Bay, Calif. (Inactive) 1958 $ - $ - 
Santa Cruz County, Calif. 1966 245,639 
1047

TABLE 34-F 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
RUSSIAN RIVER BASIN CALIF.: ESTIMATED COST FOR NEW WORK 
(See Section 25 of Text)
Estimated Cost 
Non-Federal 
Project Feature Federal Contribution Total 
Coyote Valley Dam and Reservoir 
(Lake Mendocino); Channel 
Improvements Below Dam on 
Lower 98 Miles of Russian River. $ 15,252,000 $ 5,598,000 $ 20,850,0001 
Dry Creek (Warm Springs) Dam 
and Reservoir; Channel 
Improvements Below Dam. 61,920,000 23,900,0002 85,820,000 
Knights Valley Reservoir (Franz 
and Maacama Dams) 24,650,000 216,350,0003 241,000,000 
Total $101,822,000 $245,848,000 $347,670,000 
1. Exclusive of $3,040,000 for recreation facilities at com- 3. Reimbursement by local interests to Federal Government 
pleted reservoir projects. for costs allocated to water supply storage to be paid over a 
2. Reimbursement by local interests to Federal Government period not to exceed 50 years after use of storage is initiated, 
for costs allocated to water supply storage to be paid over a plus one-half separable project cost allocated to recreation and 
period not to exceed 50 years after use of storage is initiated, fish and wildlife enhancement. 
TABLE 34-G RUSSIAN RIVER BASIN, CALIF.: PROJECT FEATURES AND ESTIMATED COSTS 
(See Section 25 of Text) 
Reservoir 
Nearest City Height of Dam Capacity Estimated 
Name (California) Distance Above Mouth and Type (Acre-Feet) Cost 
Coyote Valley Dam and Reservoir Ukiah Mile 0.8-East Fork of 160 Feet-Earthfill 122,500 $17,550,0001 
(Lake Mendocino) Russian River 
Channel Improvement (East Fork Ukiah Mile 0 to 0.8 East Fork - - 3;300,000 
Below Coyote Valley Dam and Guerneville Mile 0 to 98, Russian River 
Lower 98 Miles of Russian River) 
Dry Creek (Warm Springs) Dam Healdsburg Mile 14.4-Dry Creek 319 Feet-Earthfill 381,000 84,710,000 
and Reservoir 
Channel Improvement (Dry Creek Healdsburg Mile 1 to 14.4 Dry Creek - - 1,110,000 
Below Dry Creek (Warm 
Springs Dam) 
Knights Valley Reservoir (Franz Santa Rosa 
and Maacama Dams): 
Initial Stage of 3-Stage 
Construction: 
Franz Dam Mile 5.0 Franz Creek 144 Feet-Earthfill 233,000 63,000,000 
Maacama Dam Mile 3.6 Maacama Creek 224 Feet-Earthfill 
Ultimate Stage of 3-Stage 
Construction: 
Franz Dam Mile 4.0 Franz Creek 339 Feet-Earthfill 1,500,000 241,000,000 
Maacama Dam Mile 3.6 Maacama Dam 389 Feet-Earthfill 
1 Exclusive of $3,040,000 for recreation facilities at completed 
reservoir projects. 
1048

SAN FRANCISCO, CALIF., DISTRICT 
TABLE 34-H OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report Operation 
See Annual and 
Project Report for Construction Maintenance 
Alhambra Creek, Calif. 1969 $ - $ - 
Coyote Creek, Calif.1 1968 705,622 
East Weaver Creek, Calif.1 1965 220,6362 
Pinole Creek, Calif.1 1968 885,750 
Rheem Creek, Calif.1 1962 400,0003 
Rodeo Creek, Calif.1 1966 974,100 
Salinas River, Calif.4 1952 94,213 
San Lorenzo Creek, Calif.5 1962 5,130,8216 
San Lorenzo River, Calif.5 1966 4,314,4067 
1. Authorized by Chief of Engineers (Sect. 205, Public Law 5. Completed. 
86-645). Completed. 6. Excludes $200,000 estimated value of work performed in 
2. Includes $174,939 Public Works Acceleration Program lieu of cash contribution. 
Funds. 7. Excludes $421,182 contributed funds. 
3. Excludes $52,549 contributed funds. 
4. Improvement inactive. Cost includes engineering and 
design prior to June 30, 1952 and costs of $4,288 FY 1962 and 
1963 to determine if project classification to an active category 
was justified. 
TABLE 34-I SURVEYS 
(See Section 30 of Text) 
Type of Study Fiscal Year Cost 
Navigation $ 114,673 
Flood Control 984,907 
Beach Erosion 29,585 
Special Studies, San Francisco Bay and National Shoreline 6,658 
Coordination Studies with Other Agencies 20,000 
Total Surveys $1,155,823 
TABLE 34-J COMPLETED FLOOD PLAIN STUDIES 
(See Section 31 of Text) 
Date Federal 
Location Requesting Agency Completed Cost 
Carmel River, Calif. Monterey County June 1967 $27,600 
Coyote Creek, Calif. Santa Clara County June 1970 55,000 
Phillipsville-Garberville, Humboldt County September 1969 35,000 
South Fork Eel River, 
Calif. 
Weott-Myers Humboldt County February 1969 30,000 
Flat, South 
Fork Eel River, 
Calif. 
1049

SACRAMENTO, CALIF., DISTRICT* 
This district comprises basins of Suisun Bay and San 
Joaquin and Sacramento Rivers, in California, and 
Goose Lake in Oregon; basins of the Great Salt Lake, 
and Sevier Lake, in Utah; and intervening portion of 
Great Basin in northern Nevada, northern California, 
and southeastern Idaho; and the upper Colorado River 
basin, which is in southwestern Wyoming, eastern 
Utah, northeastern Arizona, northwestern New Mexico, 
and western Colorado, west of the Continental 
Divide. 
IMPROVEMENTS 
Navigation Page 
1. Old River, Calif ................ .................... 1052 
2. Sacramento River, Calif .................... 1052 
3. San Francisco Bay to Stockton, Calif. 
(John F. Baldwin and Stockton Ship 
Channels) ...... .......... .............. 1053 
4. San Joaquin River, Calif. .................... 1054 
5. Stockton and Mormon Channels 
(Diverting Canal), Calif. .................. 1054 
6. Suisun Bay Channel, Calif. ................. 1055 
7. Suisun Channel, Calif. .......................... 1055 
8. Other authorized navigation projects ... 1056 
Flood Control 
9. Buchanan Reservoir, Chowchilla River, 
Calif . ............... .................................. 1056 
10. Calaveras River and Littlejohn Creek 
and tributaries, including New 
Hogan and Farmington Reservoirs, 
C alif ............................. 1056 " 
11. Camanche Reservoir, Calif. ................. 1057 
12. Chester, Calif. ........................ 1058 
13. Hidden Reservoir, Fresno River, Calif. 1058 
14. Isabella Reservoir, Kern River, Calif. .. 1059 
15. Kaweah and Tule Rivers, including 
Terminus and Success Reservoirs, 
Calif ....................................................... 1059 
16. Kays Creek, Layton, Utah .................. 1061 
17. Lakeport Reservoir, Scotts Creek, Calif. 1061 
18. Little Dell Reservoir, Utah ................. 1062 
19. Lower San Joaquin River and 
tributaries, including Tuolumne and 
Stanislaus Rivers, Calif. .................... 1063 
Flood Control (cont.) Page 
20. Martis Creek Reservoir, Martis Creek, 
Nev. and Calif ............................... 1064 
21. Merced County Stream Group, Calif. .. 1064 
22. Merced River, Calif .......................... 1065 
23. Mormon Slough, Calaveras River, 
Calif. ..................................... 1065 
24. New Bullards Bar Reservoir, Calif. ...... 1065 
25. North Fork, Pit River at Alturas, 
Calif ............ .......... ................. 1066 
26. Oroville Reservoir, Calif. ................... 1066 
27. Pine Flat Reservoir and Kings River, 
Calif . ..................... ................... 1067 
28. Sacramento River and tributaries, 
Calif., from Collinsville to Shasta 
D am ..................................................... 1068 
29. Walnut Creek, Calif ........................... 1070 
30. Inspection of completed flood control 
projects ......................... 1070 
31. Scheduling flood control reservoir 
operations ..................................... 1071 
32. Other authorized flood control projects 1071 
33. Flood control work under special 
authorization .............................. 1071 
34. 
35. 
36. 
37. 
38. 
Multiple-Purpose Projects including Power 
Marysville Reservoir, Calif ............... 1071 
New Melones Reservoir, Calif. ........... 1072 
General Investigations 
Surveys ......................... ....................... 1072 
Collection and study of basic data ....... 1073 
Research and development .................. 1073 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables arereferenced in text and also 
appear at the end of this chapter. 
1051

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
NAVIGATION 
1. OLD RIVER, CALIF. 
Location. Most westerly branch of interconnecting 
tidal channels into which San Joaquin River divides in 
crossing its delta. It leaves main river 2.5 miles 
downstream from Mossdale State Highway Bridge, or 
13.5 miles above mouth of Stockton Channel, and flows 
westerly and northerly 32 miles to its lower confluence 
with main river 23 miles above its mouth in Suisun 
Bay. 
Existing project. For description of improvement and 
authorizing act, see Annual Report for 1967. Total first 
cost for completed portion $26,785 ($23,185 was 
Federal and $3,600 non-Federal for lands, damages, 
and public landings). Uncompleted portion of project 
is considered inactive and excluded from foregoing cost 
estimate. Estimated cost of this portion $63,815, of 
which $62,815 (July 1954) was Federal and $1,000 
non-Federal (1939) for lands, damages, and public 
landings. 
Local cooperation. Fully complied with for completed 
portion. 
Terminal facilities. Holly Sugar Co. refinery and 
terminal near Tracy has a large wharf and an 
unloading basin with three mechanical unloading and 
conveying units connecting with a warehouse; there is 
also a passing basin one-half mile downstream. There 
are about 100 private bank landings along project 
channels; some have sheds for storage. These are all 
privately owned and operated. Existing commerce does 
not indicate a need for provision of public landings. 
Operations and results during fiscal year. Maintenance: 
Condition studies and miscellaneous inspections and 
reports by hired labor. Dredging shoals in Doughty Cut 
to Sugar Canal by contract suction dredge, $14,014. 
Condition at end of fiscal year. New work was accomplished 
in fiscal year 1939 in Old River channel 
from its head in San Joaquin River to Grant Line 
Canal and in channels of Grant Line Canal, Crocker 
Cut, and Doughty Cut. Existing commerce does not 
indicate a need for completion of remaining channel 
construction. Channel is navigable all year. The two 
heads of navigation are at head of Old River in San 
Joaquin River, and at Holly Sugar Factory wharf, 2 
miles north of Tracy. Controlling depths: From mouth 
of river to Orwood, 11 miles, 10 feet; thence to lower 
end of Grant Line Canal, 10 miles, 10 feet; thence; (a) 
to Holly Sugar Factory near Tracy, 7 feet (low-water 
season), or (b) to head of Old River in San Joaquin 
River, 5 feet (low-water season). All depths refer to 
mean lower low water. 
2. SACRAMENTO RIVER, CALIF. 
Location. Rises in Trinity Mountains in north-central 
California, flows generally southerly about 374 miles 
and empties into Suisun Bay, an arm of San Francisco 
Bay, at Collinsville, Calif. (See Geological Survey 
topographic map of Sacramento Valley, Calif.) 
Previous projects. For details see page 1985 of Annual 
Report for 1915, and page 1708, Annual Report for 
1938. 
Existing project. For description of Sacramento Deep 
Water Ship Channel, see Annual Report for 1969. 
Total first cost for completed portion was $43,932,000 
($39,560,000 Federal (Corps), $300,000 (Coast Guard) 
, and $4,072,000 non-Federal for lands and damages, 
including relocations) and excludes local interests' costs 
$10,741,000 (June 1963) for 30-foot deep water ship 
channel and 13-foot deep connecting canal basic 
terminal facilities required under terms of project 
authorization. Project also provides for a shallow-draft 
channel 10 feet deep at mean lower low water 150 to 
200 feet bottom width, from Suisun Bay to Sacramento, 
Calif., 60 miles; a depth of 6 feet at low water between 
Sacramento and Colusa, 85 miles; a depth of 5 feet at 
low water between Colusa and Chico Landing, 50 
miles; and such depths as practicable between Chico 
Landing and Red Bluff, 53 miles, a total distance of 
248 miles. Estimated Federal cost (July 1970) of new 
work for shallow-draft river channel is $1,230,000. (See 
table 35-B for authorizing legislation.) (See table 35-C 
on tidal and flood conditions prevailing.) 
Local cooperation. Fully complied with for deep water 
ship channel project. None required on shallow-draft 
feature. 
Terminal facilities. Piers, wharves, and docks at Port of 
Sacramento for shallow-draft navigation are open-pile 
structures with timber decks, some of which are 
designed to meet extreme high waters at flood stages. 
All main wharves at Sacramento have rail connections. 
Three of above facilities are owned by city of 
Sacramento and remainder by private interests; all are 
privately operated. For full description see "Port and 
Terminal Facilities at the Ports of Stockton and 
Sacramento, Calif., 1962." Deep water terminal 
facilities comprise wharves and piers, administration 
and storage buildings, and belt railroad facilities. 
Majority of these facilities are owned and operated by 
Sacramento-Yolo Port District; remainder are privately 
owned and operated. Facilities are considered 
adequate for existing commerce. 
Operations and results during fiscalyear. New work, Deep 
Water Ship Channel: Engineering and design in 
connection with channel were completed. Initiated and 
completed additional stone protection, vicinity mile 
16.0 to mile 23.6, Sacramento River, by contract, $108, 
000. (See table 35-D for major items of work included 
in maintenance.) 
Condition at end of fiscal year. Construction of 7-foot 
shallow-draft channel below Sacramento was initiated 
in September 1899 and completed in 1904. Modified 
10-foot shallow-draft channel up to Sacramento was 
initiated in fiscal year 1928 and completed in 1931. 
Shallow-draft channel above Sacramento began in 
1052

SACRAMENTO, CALIF., DISTRICT 
April 1946 and new work is about 48 percent complete. 
Work remaining to complete shallow-draft portion of 
projects is provision of a 5-foot depth between Colusa 
and Chico Landing (50 miles). Comple tion of shallowdraft 
channel is indefinite. Construction of 30-foot deep 
water ship channel was initiated in July 1949; 
improvement dredging by continuing contracts resulted 
in provision of an operational facility for 
oceangoing vessels during June 1963. Bascule bridge 
was completed in April 1960, barge lock in August 
1961, barge canal in November 1961, and entire deep 
water ship channel in June 1970. Controlling lowwater-
season depths for shallow-draft channel were: 
From mouth of Cache Slough to Sacramento, 10 feet; 
thence to Colusa, 6 feet; thence to Sidds Landing, 3 
feet; and thence to Red Bluff, head of navigation, 1.5 
feet. Channel is navigable all year; however, there is no 
regular navigation above Colusa, 145 miles above river 
mouth. Deep-draft channel will have a controlling 
depth of 30 feet for deep-draft vessels after annual 
maintenance dredging. 
3. SAN FRANCISCO BAY TO 
STOCKTON, CALIF. (JOHN F. 
BALDWIN AND STOCKTON SHIP 
CHANNELS) 
Location. On navigation channels extending from 
entrance to San Francisco Bay to Port of Stockton 
through San Francisco, Marin, Contra Costa, Solano, 
Sacramento, and San Joaquin Counties. (See Coast 
and Geodetic Charts 5527 and 5532-5534 for respective 
areas.) 
Existing project. Project provides for modification of 
existing San Francisco Harbor, Richmond Harbor, 
San Pablo Bay and Mare Island Strait, Suisun Bay 
Channel, and San Joaquin River Navigation projects 
to provide depths of 55 feet for San Francisco Bar 
Channel, 45 feet for main internal bay channels 
upstream to vicinity of Pittsburg, and 35 feet from 
Pittsburg to Stockton; enlargement and deepening to 
45 feet of maneuvering areas adjacent to major 
petroleum refinery terminals along channel route; 
widening Suisun Bay Channel; providing access and 
turning basin facilities for potential harbor in vicinity 
of Antioch; constructing a cutoff route to Stockton 
through False River and across certain Delta tracts; 
reclaiming shoreline marshes and inundated or lowlying 
areas by spoil deposit for public recreation and 
for industrial use; providing basic recreation facilities 
on some of the reclaimed areas for public use; and 
placing additional rock revetment on waterside of 
levees bordering channels. 
Approved project estimate (July 1970) is $81,560, 
000, comprising Federal cost (Corps) of $62,900,000, 
including basic recreation facilities ($1,320,000); Federal 
cost (Coast Guard) for navigation aids $470,000; 
and non-Federal cost of $18,190,000 for lands and 
damages, relocations, berthing areas, and spoil re- 
451-584 0-72-67 
tention dikes, including the cash contribution ($400, 
000) that local interests must make for land enhancement 
at time of construction. Local interests must 
also pay, contribute in kind, or repay with interest onehalf 
of separable cost of project allocated to recreation 
and fish and wildlife $860,000. Existing project was 
adopted by 1965 River and Harbor Act (H. Doc. 208, 
89th Cong., I1st sess., contains latest published map.) 
Local cooperation. Local interests, through a public 
body legally authorized and financially capable, must 
give assurances they will furnish lands, easements, and 
rights-of-way for construction and future maintenance 
of the project and for aids to navigation, including 
spoil-disposal areas designated by the Chief of Engineers; 
provide necessary spoil retention dikes, bulkheads, 
and embankments except as applicable to spoildisposal 
areas designated as public recreation areas; 
make utility modifications and relocations required for 
construction, including new bridges or bridge alterations 
(except for railroad bridges), and absorb any 
increased annual maintenance and operation costs 
resulting therefrom; provide and maintain all necessary 
berthing areas, at a depth commensurate with 
project depth, at all terminals and wharves to be served 
by the deepened channels and, for the Port of Antioch, 
provide, maintain, and operate public terminal and 
transfer facilities; and in recognition of the local land 
enhancement benefits to result from landfill during 
dredging, contribute to the United States 4 cents per 
cubic yard of all spoil material placed during initial 
construction for modification of Suisun Bay Channel 
Project on areas not developed for public use. Local 
interests must also give satisfactory assurances, before 
starting construction of the affected units, that they will 
maintain and operate the Federally provided recreation 
areas and facilities, continue to maintain to 
adequate standards the levees altered, setback or 
provided revetment protection, and hold the U.S. 
Government free from damages due to deposition of 
spoil and construction of new levees or reconstruction 
of existing levees. Local interests, represented by Board 
of Supervisors of Contra Costa County and Stockton 
Port District, must, at time of construction, contribute 
$400,000 in cash for land enhancement; pay, contribute 
in kind, or repay with interest one-half of 
separable cost of project allocated to recreation and fish 
and wildlife ($860,000); and maintain and operate 
basic recreation facilities after construction and install 
additional basic facilities required as demands on area 
expand. No work shall be undertaken on a modification 
of Suisun Bay Channel project unit, regarding 
deepening channel between Point Edith and a proposed 
refinery or manufacturing plant, until local 
interests furnish formal assurances and definite plans 
for such installation within the Point Edith-Chipps 
Island reach of channel. Also, no work shall be 
undertaken on modification of San Joaquin River 
navigation project unit, regarding access channels in 
vicinity of Antioch, until local interests furnish formal 
53

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
assurances and definite plans for Port of Antioch. 
Formal assurances for deepening and otherwise improving 
the Stockton Deep Water Ship Channel from 
lower end of New York Slough to Stockton were 
furnished by Stockton Port District April 9, 1970. 
Terminal facilities. See Part 2, Port Series No. 30, 31, 
and 32, revised 1962, titled respectively: "The Ports of 
San Francisco and Redwood City, Calif."; "The Ports 
of Oakland, Alameda, and Richmond and Ports on 
San Pablo Bay, Carquinez Strait, and Mare Island 
Strait, Calif."; and "The Ports of Stockton and 
Sacramento, Calif." Facilities are considered adequate 
for existing commerce and will be adequate for future 
commerce upon completion of new terminal facilities. 
Operations and results during fiscal year. New work: 
Sacramento District: Continued comparative studies of 
alignment through the False River Cutoff reach of 
channel. Continued engineering, including surveys, for 
stone protection and levee setback, for Venice Island to 
Stockton and initiated plans and specifications for 
levee setback (exclusive of False River and completed 
plans and specifications for stone protection. Initiated 
preparation of combined environmental statement for 
John F. Baldwin and Stockton Ship Channels. San 
Francisco District: Continued coordination activities 
with Federal, State, and local agencies. Continued 
preliminary engineering studies including alternative 
methods of dredging and spoil disposal to determine 
ecological effects. U. S. Fish and Wildlife Service 
continued a special study relevant to transportation of 
sediments and effects of disposal of spoil material in 
San Francisco, San Pablo, and Suisun Bays. 
Condition at end of fiscal year. Preconstruction planning 
was continued. 
4. SAN JOAQUIN RIVER, CALIF. 
Location. Rises in east central California and flows 
westerly and northwesterly about 340 miles to its 
confluence with Sacramento River at head of Suisun 
Bay, 48 miles northeast of San Francisco. Deep water 
channel in San Joaquin River extends 41 miles from its 
mouth to Suisun Bay at Pittsburg to city of Stockton. 
Waterborne access to city provided by Stockton 
Channel, an artificial cut extending from rivet about 2 
miles into city. (See Coast and Geodetic Survey Sheet 
5527.) 
Existing project. For description of completed improvement, 
modifications, and authorizing acts, see 
Annual Report for 1967. (See table 35-E for total cost 
of new work for project completed in May, 1960.) 
Project units (1950 modification) reclassified and 
excluded from project cost are set forth in table 35-F. 
Modification of existing project is included as one 
unit of San Francisco Bay to Stockton, Calif., (John F. 
Baldwin and Stockton Ship Channels) project, authorized 
by 1965 River and Harbor Act (H. Doc. 208, 
89th Cong., Ist sess.); this modification is reported in 
detail under Sacramento District, Improvement No. 3. 
Local cooperation. Fully comp lied with for completed 
portion of project; for details of required cash contributions 
on completed, inactive and deferred portions 
of project, see Existing project paragraph, Annual Report 
for 1967. 
Terminal facilities. For description of harbor facilities 
at Port of Stockton, Calif., see Port Series 32, Ports of 
Stockton and Sacramento, Calif., revised 1962. Downstream 
from Stockton, traffic is accommodated by bank 
landings and sheds except at Antioch and near 
Pittsburg, where there are wharves for shallow- and 
deep-draft vessels. Terminal transfer facilities at public 
ocean terminal of Port of Stockton are adequate for 
present and immediate future. 
Operations and results during fiscal year. Maintenance: 
Minor dredging of shoals by suction dredge and 
snagging at various locations in San Joaquin River. 
Condition and operation studies, by hired labor, $26, 
175. 
Condition at end of fiscal year. Active portion of existing 
project was completed in May 1960. Construction of 
project was initiated in December 1877. 
5. STOCKTON AND MORMON 
CHANNELS (DIVERTING CANAL), 
CALIF. 
Location. An artificial cut about 3 miles east of 
Stockton, Calif., which extends from Mormon Slough 
northwesterly about 4.5 miles to intersect original 
Calaveras River Channel near northeast corner of city 
of Stockton. (See Geological Survey sheet, Stockton 
quadrangle.) 
Existing project. For description of completed improvement 
and authorizing act, see Annual Report 
1967. Total cost of new work, completed in 1923, was 
$343,703, of which $253,151 was Federal and $90,552 
non-Federal for rights-of-way required for diverting 
canal. Upon completion of Improvement No. 23, 
Mormon Slough, Calaveras River, Calif., authorized 
by 1962 Flood Control Act, local interests will maintain 
Mormon Slough, as well as existing project, and 
Federal maintenance of project will be discontinued. 
(See Condition at end offiscalyear paragraph.) 
Local cooperation. Fully complied with. 
Terminal facilities. See report on Improvement No. 4, 
San Joaquin River, Calif. 
Operations and results duringf iscaly ear. None. 
Condition at end of fiscal year. Construction of new work 
was initiated in November 1908; under this initial 
construction phase, work along Cala'ras River section 
was completed in October 1909, and canal section of 
diverting canal in September 1910. During fiscal years 
1922 and 1923, additional new work was accomplished 
in Calaveras River section to complete project. Upon 
completion of Mormon Slough, Calaveras River, in 
February 1970, local interests accepted maintenance 
responsibility for Mormon Slough as well as for existing 
1054

SACRAMENTO, CALIF., DISTRICT 
project and Federal maintenance of project was 
discontinued. No Federal maintenance costs have been 
incurred since fiscal year 1969. Canal is empty most of 
the year, but at times of extreme flood has a depth of 
about 12 feet, and at ordinary flood a depth of about 10 
feet. 
6. SUISUN BAY CHANNEL, CALIF. 
Location. Suisun Bay is about 30 miles northeast of 
San Francisco, Calif., and is an integral part of 
waterways which provide access to the Pacific Ocean 
from inland ports of California. Sacramento and San 
Joaquin Rivers flow to a junction and empty into 
Suisun Bay near Collinsville, and New York Slough, a 
distributary of San Joaquin River, which leads to head 
of Suisun Bay at Pittsburg, Calif. City of Sacramento is 
on Sacramento River about 60 miles north of Collinsville; 
access to city has been provided by 10-foot 
shallow-draft channel along river route. Sacramento 
River deep-water ship channel, completed as an 
operating facility for oceangoing vessels in June 1963, 
provides deep-draft access to Sacramento. (For details 
see Improvement No. 2, Sacramento River, Calif.) City 
of Stockton is on San Joaquin River about 40 miles 
above Pittsburg and access to city provided by Stockton 
deep-water channel. (See Coast and Geodetic Survey 
Chart 5534.) 
Previous project. For details, see page 1756 of Annual 
Report for 1920, page 1562 of Annual Report for 1926, 
and page 1714 of Annual Report for 1938. 
Existing project. For description of completed improvement 
and authorizing acts, see Annual Report for 
1967. Total Federal cost of new work for existing 
project, completed in 1934, exclusive of work accomplished 
under public works program as part of San 
Joaquin River 30-foot project, was $142,027. No local 
interests costs were incurred (for details, see page 1741 
of Annual Report for 1962). Modification of existing 
project is included as one unit of San Francisco Bay to 
Stockton, Calif., (John F. Baldwin and Stockton Ship 
Channels) authorized by 1965 River and Harbor Act 
(H. Doc. 208, 89th Congress, 1st sess.); this modification 
is reported in detail under Sacramento District, 
Improvement No. 3. 
Local cooperation. Fully complied with. 
Terminal facilities. Along channel between western 
end of bay and mouth of New York Slough are three 
wharves, all privately owned. Also, a naval magazine 
with wharves and warehouses was constructed at Port 
Chicago, on southern shore (mile 6). These facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Engineering studies and condition surveys by hired 
labor. Dredging shoals in Suisun Bay Channel from 
Carquinez Straits to New York Slough by contract 
suction dredge $145,412. 
Condition at end of fiscal year. New work under existing 
project was initiated in June 1930 and completed in 
1934; a portion of this work was accomplished under 
public works program. Portion of existing project 
authorized before public works program was completed 
in 1931 except for deepening 26-foot channel 
across Bulls Head Point to 30 feet; this portion was 
subsequently included in public works program. Work 
under public works program was accomplished during 
1933 and 1934. Channel is navigable all year and 
provides access to San Francisco Bay and navigation 
channels of San Joaquin and Sacramento Rivers. 
Controlling depth at mean lower low water in main 
channel is 30 feet, and in channel south of Seal Island is 
20 feet. Total cost for existing project to June 30, 1970, 
exclusive of work under public works program at a cost 
of $207,198 as a part of San Joaquin River 30-foot 
project, was $2,719,532, of which $142,027 was for new 
work and $2,577,505 for maintenance. 
7. SUISUN CHANNEL, CALIF. 
Location. In Suisun Slough, a tidal inlet with its 
mouth on northwest side of Suisun Bay, about 7 miles 
northeast of Benicia and 36 miles northeast of San 
Francisco. Head of navigation is at city of Suisun, 
about 13 miles north of mouth. (See Coast and 
Geodetic Survey Chart 5534.) 
Existing project. For description of completed improvement 
and authorizing acts, see Annual Report for 
1966. Total first cost for project (exclusive of terminal 
facilities), completed in 1947, was $254,377, of which 
$217,677 was Federal cost and $36,700 was non- 
Federal cost for lands, damages, and relocations. 
Overall value of terminal facilities was about $250,000 
(1960). 
Local cooperation. Fully complied with. 
Terminal facilities. Three wharves in city of Suisun, 
with a total of 600 feet of berthing space, warehouse 
space of 33,500 square feet, and an oil-storage terminal. 
These are all privately owned and operated and 
considered adequate for existing commerce. Land has 
been purchased, financing arranged, and plans prepared 
for construction of additional public-terminal 
facilities at such time as need becomes apparent. 
Certain facilities are in use for military purposes. 
Operations and results during fiscal year. Maintenance: 
Dredging of turning basin and mouth of Suisun Slough 
by contract suction dredge, $102,169. 
Condition at end of fiscal year. Construction of new work 
was initiated in March 1912; improvement of channel 
modification authorized in 1937, was initiated in May 
1946, and completed in June 1947. Channel is 
navigable all year; head of navigation is in city of 
Suisun, Calif., about 400 feet above Sacramento Street. 
Controlling depth is 8 feet in channel and harbor basin 
at mean lower low water. 
1055

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
8. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 35-G.
FLOOD CONTROL 
9. BUCHANAN RESERVOIR, 
CHOWCHILLA RIVER, CALIF. 
Location. On Chowchilla River about 36 miles above 
its mouth and about 16 miles northeast of city of 
Chowchilla, Calif. (See Geological Survey quadrangles 
for area.) 
Existing project. Provides for construction of a 205-foot 
high rockfill dam to create a reservoir with gross 
storage capacity of 150,000 acre-feet for flood control, 
irrigation, recreation, and fish and wildlife. In conjunction 
with dam, project plan provides for about 5 
miles of downstream levee and channel construction on 
Ash Slough to accommodate a project design flow of 5, 
000 cubic feet per second within slough. Operation and 
maintenance of dam and reservoir will be responsibility 
of the Federal Government. Approved cost estimate 
(July 1970) for existing project is $19,370,000, of which 
$19,100,000 is Federal cost, including $1,140,000 for 
basic recreation facilities, and $270,000 non-Federal 
costs for lands and damages, including relocations for 
downstream levee and channel improvements. Local 
interests have contracted with Bureau of Reclamation 
for irrigation service. For future non-Federal reimbursement, 
see Local cooperation paragraph. 
Local interests have also, over a period of years, 
expended about $500,000 for construction of low levees 
and clearing downstream channels to provide some 
local flood protection in project area. This work is 
inadequate during major floods. Existing project was 
adopted by 1962 Flood Control Act (S. Doc. 98, 87th 
Congress, 2d sess., contains latest published map). 
Local cooperation. California officially adopted project 
by chapter 1203 of stat utes of 1963, and by chapter 
1438 of those statutes authorized State Reclamation 
Board to furnish assurances that requirements for 
supplemental channel improvements will be met. With 
respect to the dam and reservoir, local interests must 
reimburse the Federal Government the portion of first 
cost and annual operation and maintenance costs 
allocated to irrigation functions of the project. These 
costs are estimated at 44.3 percent of the joint-use first 
cost and 41.9 percent of joint-use annual costs. Project 
authorization provides for project to be financially 
integrated into the Central Valley project of the 
Bureau of Reclamation. Irrigation repayment contracts 
were executed with the Chowchilla and La 
Branza Water Districts by the Bureau of Reclamation 
May 28, 1968. Local interests sponsoring any permanent 
pool in the reservoir for fish and wildlife or 
recreation must settle all claims for water rights 
pertaining to establishment and use of a permanent 
pool for these purposes. With respect to supplemental 
channel improvement work, section 3, Flood Control 
Act of June 22, 1936, applies. Local interests must also 
preserve, or restore and thereafter maintain, the other 
channels of Chowchilla River and Ash and Berenda 
Sloughs, from Buchanan Dam downstream to Chowchilla 
Canal, at capacities existing in 1960. Formal 
assurances for supplemental channel improvements 
have not been requested. 
Operations and results during fiscal year. New work: Plans 
and specifications for dam and appurtenances were 
completed. Acquisition of real estate was continued. 
Had the project been in operation, damages estimated 
at $100,000 from the January 1970 flood would have 
been prevented. 
Condition at end of fiscal year. Preconstruction planning 
is complete. 
10. CALAVERAS RIVER AND 
LITTLEJOHN CREEK AND 
TRIBUTARIES, INCLUDING NEW 
HOGAN AND FARMINGTON 
RESERVOIRS, CALIF. 
Location. Streams comprising Calaveras River and 
Littlejohn Creek groups rise in Sierra Nevada and its 
foothills, flow westerly across flatlands of San Joaquin 
Valley and empty into San Joaquin River directly, or 
through various sloughs, in vicinity of Stockton, Calif. 
Littlejohn Creek is in Calaveras, Stanislaus, and San 
Joaquin Counties. The three principal stream systems 
of the group are, from south to north, Lone Tree Creek, 
Littlejohn Creek, and Duck Creek. Calaveras River 
group is in Calaveras and San Joaquin Counties. The 
two principal streams of the group are, from south to 
north, Calaveras River and Bear Creek. (See Geological 
Survey Valley Springs quadrangle for New 
Hogan Reservoir area and Trigo and Bachelor Valley 
quadrangles for Farmington Reservoir area.) 
Existing project. For description of completed improvements 
consisting of Farmington Reservoir, New 
Hogan Reservoir, and Bear Creek levee and channel 
improvement, and authorizing act, see Annual Report 
for 1967. (a) Farmington: Total first cost (July 1955) 
for project was $3,995,684, of which $3,676,384 was 
Federal and $319,300 non-Federal for lands and 
damages including relocations. (b) New Hogan: 
Estimated (July 1970) Federal cost for project is $15, 
903,000, including $462,000 for basic recreation 
facilities. For future non-Federal reimbursement, see 
Local cooperation paragraph. Estimated Federal cost for 
additional recreation facilities to be funded from Code 
710 appropriations is $593,000. (c) Bear Creek: 
Estimated (July 1970) cost for project is $6,370,000, of 
which $3,185,000 is Federal, including reimbursement 
(estimated $426,000) to local interests of one-half of 
excess local interest costs of lands, rights-of-way, and 
relocations over estimated Federal construction cost in 
accordance with section 3, Public Law 738, 74th 
Congress. Non-Federal cost included in above amount 
1056

SACRAMENTO, CALIF., DISTRICT 
is $3,185,000 for relocations and lands and damages, 
exclusive of above Federal reimbursement. 
Local cooperation. Fully complied with. New Hogan: 
Local interests must pay portion of first cost and annual 
operation and maintenance costs allocated to conservation 
functions of project. These costs are estimated 
at 36.2 percent of first cost and 38 percent of annual 
costs. In addition, local interests contributed land, the 
(July 1964) market value of which was $556,000. Local 
interests have paid a total of $921,580 for irriga..ion 
services through December 31, 1969. 
Operations and results during fiscal year. New work: New 
Hogan Reservoir, regular funds: Operations included 
land acquisition activities, and miscellaneous minor 
work. Code 710 funds: Plans and specifications for 
recreation facilities were continued. Bear Creek, San 
Joaquin County: New work, regular funds: Minor 
engineering continued. Federal contribution of $129, 
991 was made to the State of California. Project 
prevented an estimated $600,000 in damages from the 
January 1970 flood. Maintenance: Farmington 
Reservoir-Maintenance and operation activities continued; 
structures were maintained in a serviceable 
condition. During the rainflood season, maximum flow 
of Duck Creek diversion was 1,110 cubic feet per 
second January 21, 1970. Maximum flow of Littlejohn 
Creek at Farmington was 1,880 cubic feet per second 
January 21, 1970. Maximum storage in reservoir was 7, 
400 acre-feet January 17, 1970, and maximum 
bihourly inflow to reservoir was 6,860 cubic feet per 
second January 14, 1970. Project prevented an 
estimated $900,000 in damages from the January 1970 
flood. New Hogan Reservoir-Maintenance and 
operation activities continued with condition and 
operation studies at a cost of $54,359 and major 
maintenance costs as follows: dam and reservoir $34, 
924; service facilities $18,989; and recreation facilities 
$83,205. Structures were maintained in serviceable 
condition. Runoff of Calaveras River above New 
Hogan Dam was near normal for the year. Maximum 
storage of 208,150 acre-feet occurred January 17, 1970. 
Maximum bihourly inflow to reservoir was 14,300 
cubic feet per second on January 14, 1970. Flood 
control releases totaled 156,000 acre-feet; maximum 
release of 4,976 cubic feet per second on January 21, 
1970. During the year, about 60,400 acre-feet of water 
was released for irrigation and other purposes. 
Condition at end of fiscal year. Farmington Reservoir: 
Construction of Farmington project was initiated in 
July 1949, and completed for beneficial flood control 
operation in 1952. Duck Creek channel improvement 
was completed in November 1951; and channel 
improvement on south Littlejohn Creek was completed 
in May 1955. There are no recreation facilities or 
public-use areas. All work completed. New Hogan 
Reservoir: Construction was initiated May 1960 and 
completed for operational use in June 1964. Closure of 
main dam was initiated May 24 and completed 
November 27, 1963. Work remaining is final settlement 
for land acquisition. Additional recreation 
facilities are to be provided from Code 710 appropriations. 
Bear Creek, San Joaquin County: Construction 
began in June 1963 and was completed in 
June 1967. Final cash contribution to local interests 
scheduled for next fiscal year. 
11. CAMANCHE RESERVOIR, CALIF. 
Location. Dam is on Mokelumne River, about 50 
miles upstream of its mouth and about 20 miles 
northeast of Stockton. (See Geological Survey topographic 
maps of area.) 
Existing project. Federal participation consists of a 
contribution toward first cost of reservoir, in an amount 
commensurate with flood control benefits to be 
attained. Project construction was accomplished by 
East Bay Municipal Utility District. Federal contribution 
is based on provision of a maximum of 200, 
000 acre-feet of reservoir storage for flood control 
operation, generally during winter months. Reservoir is 
a multiple-purpose storage reservoir for flood control 
and water supply. Improvement comprises a 171-foot 
high-zoned earth- and gravel-fill dam, creating a 
reservoir with a gross storage capacity of 431,500 acrefeet. 
Estimated (July 1970) cost is $34,700,000, of 
which $9,989,000 is Federal contribution toward flood 
control, exclusive of $133,000 incidental Federal cost, 
and $24,578,000 non-Federal cost for construction. 
Amount is based on cost allocation report approved by 
President of the United States on March 9, 1962. 
House Document 436, 87th Congress, 2d session, 
established Federal contribution at 28.9 percent of 
actual construction cost, but not to exceed $14 million, 
excluding Federal costs for engineering, administration 
of funds, and interest on Federal expenditure during 
construction period. Federal contribution authorized 
by 1960 Flood Control Act. 
Local cooperation . In consideration for a Federal 
contribution toward first costs of construction, a formal 
contract pertaining to flood control operation of project 
based upon House Document 436, 87th Congress, 2d 
session, was consummated with East Bay Municipal 
Utility District on March 19, 1962, and approved by 
Secretary of the Army April 19, 1962. An agreement 
dated January 3, 1961, between Utility District and 
State Department of Fish and Game relative to 
mitigation of damage to fish and wildlife was made a 
part of above formal contract. Utility District contracted 
with Amador and Calaveras Counties for 
upstream water rights. Except for final settlement for 
land acquisition, the Camanche project was completed 
in April 1964 and the reservoir is in operation. 
Operations and results during fiscal year. New work: 
Minor engineering continued. Federal contribution of 
$62,687 was made to the Utility District February 18, 
1970. 
Condition at end offiscalyear. Construction of main dam 
was initiated in fiscal year 1963; dam closure was 
1057

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
completed November 1963; main dam was completed 
in April 1964. Except for final settlement for land 
acquisition, Utility District has completed project. As 
of June 30, 1970, Federal contribution toward flood 
control benefits to be attained was $9,942,107. 
12. CHESTER, CALIF. 
Location. North Fork of Feather River, immediately 
upstream from the town of Chester, Plumas County, 
Calif. (See Geological Survey quadrangles for area.) 
Existing project. Provides for construction of a 45-foot 
high ungated diversion dam on North Fork of Feather 
River about one and one-half miles above Chester, 
California. Diversion dam would divert flows in excess 
of the outlet capacity of the dam into a partially leveed 
diversion channel for conveyance of floodflows circuitously 
around the town and into Lake Almanor. 
Major relocation works required by adoption of the 
plan comprise construction of two 300-foot long bridges 
over the floodway and about one mile of asphalticsurfaced 
county road. Approved cost estimate (July 
1970) for existing project is $2,230,000, of which $1, 
210,000 is Federal cost; and $1,020,000 is non-Federal 
cost for lands, damages, and relocations. Existing 
project was adopted by 1968 Flood Control Act (H. 
Doc. 314, 90th Cong., 2d sess., contains latest published 
map). 
Local cooperation. Prior to construction of the project. 
local interests must give assurances satisfactory to the 
Secretary of the Army that they will: (a) Provide 
without cost to the United States, all lands, easements, 
and rights-of-way necessary for construction and 
operation of the proposed improvements, including in 
this provision the undertaking of all necessary modifications 
and relocations of roads or other existing 
structures or utilities; (b) hold and save the United 
States free from damages due to the construction 
works; (c) maintain and operate the completed project 
in accordance with regulations prescribed by the 
Secretary of the Army; and (d) prescribe and enforce 
regulations designed to prevent encroachment of any 
type that would impair the flood control effectiveness of 
the works. The California State Reclamation Board 
has indicated intent to provide the foregoing assurances. 
Operations and results during fiscal year. None. Had the 
project been in operation, damages estimated at $140, 
000 from the January 1970 flood would have been 
prevented. 
Condition at end offiscalyear. Preconstruction planning 
has not been initiated. 
13. HIDDEN RESERVOIR, FRESNO 
RIVER, CALIF. 
Location. On Fresno River about 50 miles above its 
mouth and about 15 miles northeast of Madera, Calif. 
(See Geological Survey quadrangles for area.) 
Existing project. Provides for construction of a 163-foot 
high earthfill dam to create a reservoir with gross 
storage capacity of 90,000 acre-feet for flood control, 
irrigation, recreation and other purposes. In conjunction 
with the dam, the project plan provides for 
about 7 miles of downstream levee and channel 
improvements on Fresno River from Fresno River 
bypass to Chowchilla Canal to accommodate project 
design flow of 5,000 cubic feet per second. Operation 
and maintenance of dam and reservoir would be 
responsibility of Federal Government. Approved estimated 
(July 1970) cost for existing project is $22,320, 
000, of which $22,000,000 is Federal cost, including $1, 
370,000 for basic recreation facilities, and $320,000 
non-Federal cost for lands and damages including 
relocations for downstream levee and channel improvements. 
Local interests have contracted with 
Bureau of Reclamation for irrigation service. For 
future non-Federal reimbursement, see Local cooperation 
paragraph. Local interests have also, over a period of 
years, expended about $300,000 for construction of low 
levees and clearing downstream channels to provide 
some local flood protection in the project area. This 
work is inadequate during major floods. Existing 
project was adopted by 1962 Flood Control Act (S. 
Doc. 37, 87th Cong., 1st sess., contains latest published 
map). 
Local cooperation. California officially adopted project 
by chapter 1202 of statutes of 1963, and by chapter 
1438 of those statutes authorized State Reclamation 
Board to furnish assurances that requirements for 
supplemental channel improvements will be met. With 
respect to the dam and reservoir, local interests must 
reimburse the Federal Government the portion of first 
cost and annual operation and maintenance costs 
allocated to irrigation function of project. These costs 
are estimated at 21.7 percent of the joint-use first cost 
and 15.9 percent of joint-use annual costs. Project 
authorization provides for project to be financially 
integrated into the Central Valley project of the 
Bureau of Reclamation. Irrigation repayment contract 
was executed by the Bureau with the Merced Irrigation 
District August 5, 1968. Local interests sponsoring any 
permanent pool in the reservoir for fish and wildlife or 
recreation must settle all claims for water rights 
pertaining to establishment and use of a permanent 
pool for these purposes. With respect to supplemental 
channel improvement work, section 3, Flood Control 
Act of June 22, 1936, applies; relocations include 
relocation of highway facilities and utilities. Local 
interests must also preserve, or restore and thereafter 
maintain, the Fresno River channel from Hidden 
Reservoir downstream to the authorized channel work 
at the capacities prevailing in 1959. Formal assurances 
for supplemental channel improvements have not been 
requested. 
Operations and results during fiscal year. New work: 
Engineering and acquisition of real estate were 
continued. Had the project been in operation, damages 
1058

SACRAMENTO, CALIF., DISTRICT 
from the January 1970 flood estimated at $50,000 
would have been prevented. 
Condition at end offiscalyear. Preconstruction planning 
is complete. 
14. ISABELLA RESERVOIR, KERN RIVER, 
CALIF. 
Location. About 50 miles northeast of city of Bakersfield, 
Calif., near confluence of north and south forks 
of Kern River; auxiliary dam is about one-half mile 
east of main dam. (See Geological Survey quadrangles 
of areas.) 
Existing project. For description of completed improvement 
and authorizing act, see Annual Report for 
1967. Estimated Federal cost (July 1970) for new work 
is $22,027,000. For future non-Federal reimbursement 
see Local cooperation and Licenses paragraphs. Estimated 
Federal cost (July 1970) of recreation facilities for 
Isabella Reservoir, to be funded from Code 710 
appropriations is $2,565,000. Operation and maintenance 
of dam and reservoir is Federal responsibility. 
Local cooperation. California officially adopted project 
by chapter 1514 of statutes of 1945, State of California. 
Local interests, represented by North Kern, Buena 
Vista, and Tulare Lake Basin Water Storage Districts 
and La Hacienda Water District, were required to 
reimburse the Federal Government the portion of first 
cost and annual operation and maintenance costs 
allocated to irrigation functions of project. These costs 
based on a cost allocation study completed in December 
1955, are $4,573,000 of first cost and 21.7 
percent of annual operation and maintenance costs. 
For the years 1956 through 1964, an interim contract 
between Bureau of Reclamation and local water users 
provided for storage and payment of irrigation water. 
Under provisions of this interim contract, local interests 
paid $1,936,229 through December 31, 1964. A longterm 
contract between the Bureau and local water 
users was executed October 23, 1964. Balance due on 
allocated first cost of $4,573,000 was paid by the water 
users on March 31, 1965. Kern County assumed 
administration of recreation and development and 
maintenance of public use areas at project in accordance 
with a 25-year license February 15, 1955. 
The agreement with Kern County provides for joint 
operation and development by the Corps and Kern 
County. Permits have been granted to concessionaires 
by the county to provide certain services not rendered 
by the county. Total cost of present recreation facilities 
developed by the county and its concessionaires is 
about $880,000; $235,000 of this was a grant from the 
California Wildlife Conservation Board and about 
$370,000 is investment by concessionaires. This investment 
provided partial development of 21 recreation 
sites around the reservoir. 
Licenses. In accordance with Federal Power Commission 
Docket No. E-6578, issued April 1, 1963, 
payment of $377,426 was made to the Federal 
Government by Pacific Gas and Electric Co. ($108, 
352) and Southern California Edison Co. ($269,074) 
for headwater benefits to downstream existing plants 
from Isabella Dam to cover benefits from April 15, 
1954, to December 31, 1962. Subsequent to 1962, the 
power companies have in the aggregate made annual 
payments of $44,650 for headwater benefits. That 
amount will be paid each year until changes in 
operation, development, or costs indicate some modification 
to be advisable. Cumulative use charges 
collected by the Federal Power Commission and 
returned to the U.S. Treasury through period ending 
June 30, 1969, amounted to $689,976. 
Operations and results during fiscal year. New work, 
regular funds: None. Code 710 funds: Minor construction 
costs for recreation facilities were continued. 
Maintenance: Maintenance and operation activities 
continued with condition and operation studies at a 
cost of $63,528 and major maintenance costs as follows: 
dam and reservoir $20,651; service facilities $18,377 
and recreation facilities $195,160. Structures were 
maintained in good condition. Runoff of Kern River 
above Isabella Reservoir was near normal for the year. 
Maximum storage of 578,100 acre-feet occurred July 
14, 1969, as a result of the large April-July 1969 
snowmelt runoff. Reservoir surcharge of 8,100 acre-feet 
above gross pool occurred during the first recorded spill 
in the 16-year history of the project. Maximum 
bihourly inflow to Isabella Reservoir was 11,300 cubic 
feet per second on January 16, 1970, and maximum 
outflow of 4,699 cubic feet per second occurred July 1, 
1969. Release of water for irrigation and spreading uses 
totaled 818,300 acre-feet. Water released for flood 
control amounted to 279,200 acre-feet, of which 8,000 
acre-feet reached the Buena Vista Lakebed area 
during July 1969. Isabella Reservoir completely 
contained the January 1970 flood. Project prevented 
an estimated $400,000 in damages from the January 
1970 flood. 
Condition at end of fiscal year. Construction began in 
March 1948 and was completed in June 1968. Main 
dam, Borel Canal outlet works and appurtenances, and 
auxiliary dam were completed in April 1953. Storage 
impoundment began December 1952. Project is operating 
to provide flood protection and irrigation 
benefits for which it was designed. Additional recreation 
facilities are to be provided by Code 710 funds. 
15. KAWEAH AND TULE RIVERS, 
INCLUDING TERMINUS AND 
SUCCESS RESERVOIRS, CALIF. 
Location. Terminus Reservoir is on Kaweah River 
about 20 miles east of Visalia, Calif. Success Reservoir 
is on Tule River about 5 miles east of Porterville, Calif. 
(See Geological Survey quadrangles of area.) 
Existing project. Terminus Reservoir: A rolled earthfill 
and rock shell main dam structure 250 feet high and 2, 
375 feet long, and auxiliary earthfill dam 130 feet high 
1059

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
and 870 feet long, and an ungated spillway in left 
abutment of dam. Reservoir has a gross storage 
capacity of 150,000 acre-feet. Spreading facilities of 
capacity contemplated in authorizing document, 
comprising a complex system of channels, basins, and 
other irrigation facilities, have been constructed by 
local interests since preparation of survey report and 
are fully adequate for project purposes. Estimated 
Federal cost (July 1970) of new work is $19,298,000, 
including $207,000 for basic recreation facilities and 
excluding spreading works constructed by local interests 
at an estimated (July 1957) cost of about $750, 
000. Estimated (July 1970) Federal cost of recreation 
facilities, to be funded from Code 710 appropriations is 
$498,000. Success Reservoir: A rolled earthfill main 
dam structure 142 feet high and 3,490 feet long, an 
auxiliary rolled-earthfill dam or dike 40 feet high and 
7,650 feet long across Frazier Valley about 3.5 miles 
northwesterly from main dam, and an ungated 
spillway. Reservoir has a gross storage capacity of 85, 
000 acre-feet. Estimated Federal cost (July 1970) of new 
work for Success Reservoir is $14,257,000, including 
$193,000 for basic recreation facilities. Estimated (July 
1970) Federal cost of recreation facilities to be funded 
from Code 710 appropriations is $704,000. For future 
non-Federal reimbursements, see Local cooperation paragraph. 
Operation and maintenance of reservoirs is 
Federal responsibility. Flood Control Act of 1944 
authorized existing project and $4,600,000 for initiation 
and partial accomplishment of construction of 
Success and Terminus Reservoirs. Additional monetary 
authorization for completion of this comprehensive 
plan was provided by Public Law 85-500 
(H. Flood Control Committee Doc. 1, 78th Cong., 2d 
sess., & H. Doc. 559, 78th Cong., 2d sess., contains 
latest published map). Lake formed by Terminus Dam 
was designated "Lake Kaweah" by Public Law 87-568. 
Local cooperation. California officially adopted projects 
by chapter 1514 of statutes of 1945, State of California. 
Local interests for Terminus Reservoir are represented 
by Kaweah Delta Water Conservation District. Local 
interests for Success Reservoir are considered to be 
represented by the Vandalia, Porterville, and Lower 
Tule River Irrigation Districts, the Tulare Lake Basin 
Water Storage District, and Pioneer Water Co., which 
represent over 90 percent of irrigated land and waterright 
holders along Tule River below damsite. Local 
interests must reimburse the Federal Government the 
portion of first cost and annual operation and 
maintenance costs allocated to irrigation functions of 
projects. These costs are estimated at 14.1 percent of 
first and annual costs for Terminus Reservoir and 9.5 
percent of first and annual costs for Success Reservoir. 
Local interests for Terminus Reservoir also stated they 
will continue to operate and maintain spreading works 
and downstream channel systems to provide required 
capacity for disposal of floodwaters. Local interests for 
Success Reservoir also stated they will continue to 
maintain downstream channel systems to provide 
required capacity for disposal of flood waters. Repayment 
contracts between Bureau of Reclamation 
and local water users for irrigation supply from 
Terminus and Success Reservoirs were executed 
January 11, 1965, and April 30, 1965, respectively. 
Reservoirs are being operated for irrigation storage as 
well as flood control and incidental recreation use. 
Tulare County acquired water for recreation pools at 
the projects. Local interests paid the following total 
amounts for irrigation services through June 30, 1969: 
Terminus Reservoir, $520,705 and Success Reservoir, 
$220,488. Tulare County was granted a 25-year license 
for planning, development, and management of public 
recreation areas at Success Reservoir July 10, 1960, 
and at Terminus Reservoir, June 5, 1961. Basic publicuse 
facilities constructed by Corps at Success Reservoir 
were transferred to jurisdiction of Tulare County on 
January 18, 1962; facilities at Terminus were transferred 
June 20, 1962. In March 1967, an amendment to 
the license agreements was approved by the Assistant 
Secretary of the Army. Under these amended licenses, 
Tulare County retained administration of only specified 
land areas and operation and maintenance of 
recreation facilities in these areas. In addition, they 
continued their program of water safety, boat inspection, 
and law enforcement at both Terminus and 
Success Reservoirs. The Corps took over the administration 
of the remainder of the project land areas 
and the operation and maintenance of recreation 
facilities in these areas. California Department of Fish 
and Game expended funds to improve fishery resources 
of Terminus Reservoir. Tulare County, by expenditure 
of county funds and by a lease to a concessionaire, has 
partially developed five recreation sites around the 
reservoir at an estimated cost of $123,000. California 
Department of Fish and Game expended funds to 
improve fishery resources of Success Reservoir, and, in 
conjunction with Tulare Sportsman's Council, developed 
a habitat for upland game birds. County of 
Tulare, by expenditure of county funds and leases to 
concessionaires (total $254,000), and with assistance 
from California Department of Fish and Game and 
Tulare Sportman's Council, has partially developed six 
areas, some of which were provided with temporary 
facilities. 
Operations and results during fiscal year. New work: 
Terminus Reservoir, regular funds: Minor hired labor. 
Code 710 funds: Continuation of engineering. 
Success Reservoir, regular funds: Minor hired labor 
in connection with land settlement. Code 710 funds: 
Continuation of engineering at cost of $22,842. 
Maintenance: Terminus Reservoir: Maintenance 
and operation activities continued with condition and 
operation studies at a cost of $54,127 and major 
maintenance costs as follows: dam and reservoir $32, 
623; service facilities $16,426; and recreation facilities 
$35,720. Structures were maintained in serviceable 
condition. Runoff of Kaweah River above Terminus 
Reservoir was near normal for the year. Maximum 
1060

SACRAMENTO, CALIF., DISTRICT 
storage of 156,500 acre-feet occurred July 1, 1969, as a 
result of the large April-July 1969 snowmelt runoff. 
Reservoir surcharged 3.49 feet above spillway crest by 
means of a temporary barrier constructed in the 
spillway notch. Maximum bihourly inflow to Terminus 
Reservoir on January 16, 1970, was about 17,200 cubic 
feet per second. Maximum outflow from reservoir 
occurred on July 1, 1969, and was 3,304 cubic feet per 
second. Release of water for irrigation and spreading 
uses totaled 274,500 acre-feet. Water released for flood 
control amounted to 298,400 acre-feet, of which 4,900 
acre-feet reached the Tulare Lakebed area during July 
1969. During the January 1970 rainflood, approximately 
500 acre-feet of water reached the Tulare 
Lakebed area, which occurred from flow originating 
below Terminus Reservoir. Operation of Terminus 
Dam prevented flooding in Visalia and other communities 
in flood plain as well as adjacent agricultural 
lands. Project prevented an estimated $1,000, 000 in 
damages from the January 1970 flood. 
Success Reservoir: Maintenance and operation 
activities continued with condition and operation 
studies at a cost of $44,645 and major maintenance 
costs as follows: dam and reservoir $30,486; service 
facilities $22,556; and recreation facilities $43,335. 
Structures were maintained in serviceable condition. 
Runoff of Tule River above Success Reservoir was near 
normal during the year. Maximum storage of 93,700 
acre-feet occurred July 1, 1969, as a result of the large 
April-July 1969 snowmelt runoff. Reservoir surcharged 
3.32 feet above spillway crest by means of a temporary 
barrier constructed on the spillway sill. Maximum 
bihourly inflow to Success Reservoir was 15,200 cubic 
feet per second on January 16, 1970. Maximum 
outflow of 695 cubic feet per second occurred on July 
22, 1969. Release of water for irrigation and spreading 
totaled 93,200 acre-feet. Water released for flood 
control amounted to 107,900 acre-feet. During the 
January 1970 rainflood, approximately 2,100 acre-feet 
of water reached the Tulare Lakebed area, which 
occurred from flow originating below Success Reservoir. 
Operation of Success Dam prevented flooding 
in Porterville and suburban areas. Project prevented 
an estimated $2,000,000 in damages from the January 
1970 flood. 
Condition at end of fiscal year. Terminus Reservoir: 
Construction of project began in July 1957 and was 
completed in June 1968 except for final settlement of 
land acquisition. Construction of main dam and 
appurtenances, initiated in February 1959, was completed 
in June 1962. Dam has been operating since 
November 1961 to provide flood protection for which it 
was designed; conservation impoundment was commenced 
May 1962. Appurtenances are in good 
condition. Additional recreation facilities are to be 
provided by Code 710 funds. Success Reservoir: 
Construction of project began in November 1956 and 
was completed in June 1968 except for final settlement 
for one tract of land upon decision of pending court 
case. Construction of main dam and appurtenances, 
initiated in October 1958, was completed in May 1961. 
Dam has been operating since October 1960 to provide 
flood protection for which it was designed; conservation 
impoundment was commenced March 1962. 
Additional recreation facilities are to be provided by 
Code 710 funds. 
16. KAYS CREEK, LAYTON, UTAH 
Location. This small stream drains about 9 square 
miles of the western slope of the Wasatch Range and 
flows through the city of Layton, Davis County, Utah, 
to the Great Salt Lake. 
Existing project. Provides for clearing and enlarging 
Kays Creek channel, including enlargements of culverts 
and bridges, for a total distance of about 4.5 miles. 
Minor amounts of channel straightening would be 
required. Estimated (July 1970) cost for project is $605, 
000, of which $305,000 is Federal cost (including $30, 
000 for preauthorization studies) and $300,000 is non- 
Federal cost. Existing project approved by Chief of 
Engineers, November 3, 1965, under provisions of 
section 205, 1948 Flood Control Act, as amended. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Local interests must also prevent 
encroachment on project channels by unauthorized 
construction of bridges, road crossings, dams, or other 
obstructions. Formal assurances furnished by Board of 
Davis County Commissioners were accepted by District 
Engineer, June 17, 1968. 
Operations and results during fiscal year. Contract 
construction plans and specifications were approved in 
August 1969. A major portion of rights-of-way requested 
from Davis County December 24, 1968, has 
been received. 
Condition at end of fiscal year. Preconstruction planning 
is complete. Initiation of construction is pending 
receipt of remaining rights-of-way. 
17. LAKEPORT RESERVOIR, SCOTTS 
CREEK, CALIF. 
Location. On Scotts Creek about 2 miles west of city of 
Lakeport, Calif. (See Geological Survey quadrangles 
for area.) 
Existing project. Provides for construction of a 142-foot 
high earthfill dam to create a reservoir with gross 
storage capacity of 55,000 acre-feet for flood control, 
municipal water supply, irrigation, general recreation, 
and fish and wildlife. In conjunction with dam, project 
plan provides for about 7 miles of downstream levee 
and channel improvements on Scotts Creek below 
Scotts Valley in Lake County to accommodate a 
project design flow of 4,000 cubic feet per second in this 
reach. Operation and maintenance of dam and 
reservoir will be Federal responsibility. Approved cost 
estimate (July 1970) for existing project is $13,090,000, 
of which $12,700,000 is Federal cost, including $580, 
1061

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
000 for basic recreation facilities, and $390,000 non- 
Federal cost for lands and damages, including relocations 
for downstream levee and channel improvements. 
For future non-Federal reimbursement, 
see Local cooperation paragraph. Existing project was 
adopted by 1965 Flood Control Act (H. Doc. 259, 89th 
Cong., 1st sess., contains latest published map). 
Local cooperation. With respect to the dam and 
reservoir, local interests, represented by Lake County 
Flood Control and Water Conservation District, must 
reimburse the Federal Government the portion of first 
cost and annual operation, maintenance, and replacement 
costs allocated to municipal water supply 
(29.8 percent of first cost and 21.7 percent of annual 
costs) and irrigation (16.6 percent of first cost and 8.3 
percent of annual costs); pay, contribute in kind, or 
repay (which may be through user fees) with interest 
one-half of separable cost of project allocated to 
recreation and fish and wildlife; and bear all costs of 
operation, maintenance, and replacement of recreation 
and fish and wildlife facilities. Before construction, 
local interests must agree to make necessary arrangements 
for repayment of that part of construction 
cost and annual operation and maintenance costs 
allocated to municipal water supply and irrigation and 
settle all claims for water rights, including claims 
pertaining to establishment of a permanent pool for 
fish and wildlife or general recreation. With respect to 
supplemental channel improvement work, section 3, 
Flood Control Act of June 22, 1936, applies. Local 
interests must also prevent encroachment of any type 
that would impair flood control effectiveness of project 
works and preserve, or restore, and thereafter maintain, 
the other channels of Scotts Creek from the dam 
downstream to its confluence with Middle Creek, at 
capacities existing in 1963. Formal assurances have not 
been requested from local interests. 
Operations and results during fiscal year. New work: 
Preconstruction engineering studies and design memoranda, 
including a site selection DM, were continued. 
Had project been in operation, damages estimated at 
$240,000 from the January 1970 flood would have been 
prevented. 
Condition at end offiscal year. Preconstruction planning 
was continued. 
18. LITTLE DELL RESERVOIR, UTAH 
Location. On Dell Creek, a tributary of Parleys Creek, 
about 8 miles east of Salt Lake City, Utah. (See 
Geological Survey quadrangles for area.) 
Existing project. Provides for the construction of a dam 
about 310 feet high, to create a reservoir with a gross 
capacity of 50,000 acre-feet for flood control, municipal 
and industrial water supply, and recreation. 
Project plan includes facilities for the diversion of water 
from Emigration Creek, Lambs Canyon Creek, and 
Mill Creek to Little Dell Reservoir. Reservoir would be 
operated with the existing Mountain Dell Reservoir 
(capacity 3,200 acre-feet) on Parleys Creek for flood 
control and water supply. Approved cost estimate (July 
1970) for existing project is $29,510,000, of which $28, 
800,000 is Federal cost, including $1,200,000 for basic 
recreation facilities; and $710,000 is non-Federal 
required cash contribution for lands and relocations 
allocated to flood control. For future non-Federal 
reimbursement, see Local cooperation paragraph. Existing 
project was adopted by 1968 Flood Control Act 
(S. Doc. 53, 90th Cong., 1st sess., contains latest 
published map). 
Local cooperation. Local interests must give assurances 
satisfactory to the Secretary of the Army that they will: 
(a) obtain without cost to the United States all water 
rights necessary for operation of the project in the 
interest of water supply; (b) hold and save the United 
States free from damages due to water-rights claims 
resulting from construction and operation of the 
project; (c) repay all costs allocated to water supply, as 
determined by the Chief of Engineers, in accordance 
with the provisions of the Water Supply Act of 1958, as 
amended; (d) maintain and operate the existing 
Mountain Dell Reservoir in accordance with flood 
control rules and regulations to be prescribed by the 
Secretary of the Army; (e) in accordance with the 
Federal Water Project Recreation Act: administer 
project land and water areas for recreation and fish and 
wildlife enhancement; pay, contribute in kind, or 
repay, which may be through user fees, with interest, 
one-half of the separable cost allocated to recreation 
and fish and wildlife enhancement, presently estimated 
at $800,000; and bear all costs of operation, maintenance 
and replacement of recreation and fish ahd 
wildlife lands and facilities; (f) adequately inform 
interests affected that the project does not provide 
protection against rainfloods originating below the 
dam, and that the project-related diversion facilities do 
not provide protection against large floods on Emigration 
and Mill Creeks; (g) contribute the cost of 
lands, easements, rights-of-way, and relocations allocated 
to flood control, either in cash or in kind, and 
bear all costs of operation, maintenance and replacements 
for flood control; and (h) protect channels 
downstream from the reservoir from encroachment 
which would adversely affect r eservoir operation. On 
July 7, 1965, the Board of Directors of the Metropolitan 
Water District of Salt Lake City passed a 
resolution of intent to furnish the necessary assurances 
of local cooperation. 
Operation and results during fiscal year. Engineering 
studies pertaining to preparation of Economics and 
Plan Formulation Design Memorandum was initiated. 
Condition at end offiscalyear. Preconstruction planning 
was initiated with funds released from budgetary 
reserve in May 1970. 
1062

SACRAMENTO, CALIF., DISTRICT 
19. LOWER SAN JOAQUIN RIVER AND 
TRIBUTARIES INCLUDING 
TUOLUMNE AND STANISLAUS 
RIVERS, CALIF. 
Location. (a) New Melones Reservoir: (See Improvement 
No. 35). (b) Tuolumne River Basin: Cherry 
Valley Reservoir-on Cherry Creek in upper Tuolumne 
River watershed, about 12 miles above junction 
with Tuolumne River, in northwest corner of Yosemite 
National Park, Calif. New Don Pedro Reservoir-on 
Tuolumne River, a tributary of San Joaquin River, in 
Tuolumne County, Calif., about 32 miles east of city of 
Modesto. (c) Lower San Joaquin River and tributaries: 
On lower reaches of San Joaquin River and of 
Stanislaus and Tuolumne Rivers. (See Geological 
Survey quadrangles of area.) 
Existing project. Tuolumne River Basin: A Federal 
contribution for flood protection to be afforded by local 
interests construction and operation of Cherry Valley 
and New Don Pedro Reservoirs for municipal water 
supply, power generation, irrigation, and flood control. 
Ultimately the flood protection will be derived from 
operation for flood control of at least 340,000 acre-feet 
of storage in New Don Pedro Reservoir. First phase of 
development by local interests was construction for 
municipal water supply, power generation, and other 
purposes, of Cherry Valley Reservoir in upper Tuolumne 
River watershed, completed in December 1955 
for interim flood control storage. Second phase of 
development will be construction of New Don Pedro 
Dam on Tuolumne River. Improvement will comprise 
a rock and earthfill dam, 565 feet high, to create a 
reservoir capacity of 2,030,000 acre-feet for purpose of 
municipal water supply, power generation, irrigation, 
and flood control. Approved cost estimate (July 1970) 
is $74,636,000 comprised of $59,800,000 non-Federal 
cost; $14,464,000 Federal contribution, including 
payments totaling $9,000,000 made to local interests 
toward first phase; and $372,000 Federal engineering 
and administrative costs, including $236,000 expended 
for initial phase. 
Lower San Joaquin River and tributaries: Levee and 
channel improvement for flood control along San 
Joaquin River from mouth of Merced River to San 
Joaquin Delta near Stockton, and on lower reaches of 
Stanislaus and Tuolumne Rivers by raising and 
strengthening existing levees; construction of new 
levees; revetment of river banks where required; 
removal of accumulated snags in main river channel; 
and acquisition, by local interests, of flowage rights on 
natural overflow lands where necessary to insure 
continued effectiveness of channel storage on San 
Joaquin River. Project was modified to permit local 
interests to construct levees and channel improvements 
upstream from Merced River, where required, in lieu 
of acquiring flowage easements. This project is an 
integral unit of overall plan for flood control and other 
purposes on San Joaquin River and tributaries, and 
supplements reservoir units of overall plan involving 
flood control storage on Tuolumne and Stanislaus 
Rivers and in existing Friant Reservoir on upper San 
Joaquin River by providing required channel capacity 
for regulated flows. 
Cost estimate (July 1970) for existing project is $19, 
410,000, of which $13,110,000 is Federal cost and $6, 
300,000 non-Federal cost for lands and damages 
including relocations. Local interests constructed levee 
and channel improvement works in area adjacent to 
river above mouth Merced River in lieu of acquisition 
of flowage easements. Estimated cost of this work (July 
1970) is $24,000,000. Left bank levee in Tuolumne 
River to Merced River reach is now considered active 
and is included in foregoing cost estimate. Existing 
project was adopted by 1944 Flood Control Act (H. 
Flood Control Committee Doc. 2, 78th Cong., 2d sess., 
contains latest published map); as modified by Public 
Law 327, 84th Congress. The 1944 Flood Control Act 
authorized $8 million for partial accomplishment of 
project. Further monetary authorizations of $2,500, 
000, $5 million, $13 million, $2 million, $17 million, 
and $18 million were provided for this project by 
Public Laws 235 and 780, 83d Congress, and 85-500, 
90-17, 90-483, and 91-282, making a total monetary 
authorization of $65,500,000 available. 
Local cooperation. Tuolumne River Basin: In consideration 
of a Federal contribution toward first costs of 
construction, local interests must construct, maintain, 
and operate New Don Pedro Reservoir allocating 340, 
000 acre-feet of storage space therein for flood control, 
and operate such flood control reservation as prescribed 
by the Secretary of the Army. A contract was 
negotiated in 1949 with local interests, comprising City 
and County of San Francisco and Turlock and 
Modesto Irrigation Districts, whereby they agreed to 
provide the above flood control storage in New Don 
Pedro Reservoir when constructed in exchange for 
Federal contribution. Construction of Cherry Valley 
Reservoir, and provisions of interim flood control 
storage therein as well as in existing Don Pedro and 
Hetch Hetchy Reservoirs, provided about 75 percent of 
flood control requirements for overall development, 
and Federal payments totaling $9 million made to 
local interests for this first phase. Second and final 
phase consists of construction of New Don Pedro 
Reservoir, operation of the flood control reservation in 
that reservoir, and cessation of operation of upstream 
reservoirs for flood control. Local interests have 
initiated construction of New Don Pedro Reservoir; 
bond issues for project received overwhelming approval 
of voters in elections held in November 1961 in 
Modesto, Turlock, and San Francisco. Federal Power 
Commission issued a license for project March 10, 
1964. The irrigation districts approved acceptance of 
the FPC license May 23, 1966. Main dam contract was 
awarded in August 1967. Lower San Joaquin River 
and tributaries: Assurances were accepted by District 
Engineer January 6, 1956. Local interests fully 
1063

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
complied with requirements for all Federal work 
completed or under contract, and indicated they will 
be able to fulfill local cooperation requirements for 
remaining work as scheduled. Ninety seven miles of the 
project total of 103 miles of levee construction have 
been transferred to and accepted by the State. 
Expenditures by local interests toward fulfillment of 
these requirements through June 30, 1970, were about 
$6,144,719. State revised their plan to include a bypass 
in lieu of improvement of existing levees along upper 
river reaches, thereby eliminating about 175 miles of 
levee construction along main San Joaquin River. 
Completed State project included construction of 
about 193 miles of levees, along with 18 major bridges 
and 7 control structures. Work extends along San 
Joaquin River from mouth of Merced River upstream 
to about 45 miles below Friant Dam near Fresno. Total 
cost of this plan is estimated (July 1970) at $24,000,000. 
Operations and results during fiscal year. New work: 
Tuolumne River Basin, including Cherry Valley and 
New Don Pedro Reservoirs-Engineering continued 
on New Don Pedro. Federal contribution of $1,321,500 
was made to the City and County of San Francisco and 
Turlock and Modesto Irrigation Districts. Project 
prevented an estimated $500,000 in damages from the 
January 1970 flood. Lower San Joaquin River and 
tributaries- Engineering continued on left bank levee 
in Tuolumne River to Merced River reach. 
Condition at end of fiscal year. Tuolumne River Basin: 
Cherry Valley Reservoir-first phase, completed in 
1950; New Don Pedro Reservoir-second phase, 
construction began in August 1967. Total Federal 
contribution as of June 30, 1970, was $2,221,514. 
Lower San Joaquin River anrid tributaries: Construction 
began in July 1956 and project is about 94 
percent complete. Remaining work is recently reactivated 
improvement on left bank levee in Tuolumne 
River to Merced River reach. State of California 
construction on non-Federal portion of project above 
mouth of Merced River, initiated in fiscal year 1960, is 
complete. 
20. MARTIS CREEK RESERVOIR, 
MARTIS CREEK, NEV. AND CALIF. 
Location. Reservoir to be on Martis Creek, a tributary 
of Truckee River, near Truckee, Calif.; intermittent ch 
annel improvements would be on Truckee River in 
Reno, Nev. (See Geological Survey quadrangles for 
areas.) 
Existing project. Provides for construction of 113-foot 
high rolled-earthfill dam to create a reservoir with 
gross storage capacity of 20,000 acre-feet for flood 
control and future municipal and industrial water 
supply. In conjunction with the dam, the project 
provides for construction by local interests of intermittent 
channel improvements in Reno, Nev., 
necessary to provide a flood-carrying capacity of 14, 
000 cubic feet per second through the city. Approved 
cost estimate (July 1970) for existing project is $8,000, 
000, of which $7,900,000 is Federal cost including $180, 
000 for basic recreation facilities, and $100,000 is non- 
Federal cost for channel improvement in Reno, Nev. In 
addition, local interests have, over a period of years, 
expended about $200,000 for construction of flood 
control channels within city of Reno. This work is 
inadequate during major floods. Existing project was 
authorized by 1962 Flood Control Act (H. Doc. 435, 
87th Cong., 2d sess., contains latest published map). 
Local cooperation. Local interests must provide a 
channel capacity of 14,000 cubic feet per second in 
Truckee River through Reno, Nev., including necessary 
modification and relocations of existing structures 
and facilities. Local interests must maintain 
completed channel as required to preserve channel 
capacity of 14,000 cubic feet per second; establish 
effective regulations to prevent any encroachment 
within channel in Reno, and insure that all bridges or 
other structures to be built or rebuilt across channel in 
Reno afford an adequate and unrestricted waterway; 
maintain channel of Truckee River between Reno and 
the California-Nevada State line clear of all floatable 
debris and other drift large enough to restrict bridge 
openings in Reno during floods; and adequately 
inform interests affected that project (reservoir and 
related channel improvements) does not provide 
protection against maximum floods. Formal assurances 
requested from the Carson-Truckee Water Conservancy 
District September 8, 1967, were furnished 
November 13,1967. 
Operations and results during fiscal year. New work: 
Minor land acquisition and engineering were continued, 
$80,734. Main dam and appurtenances contract 
was initiated, $119,968. 
Condition at end of fiscal year. Construction of project 
was initiated in August 1967 and is about 28 percent 
complete. 
21. MERCED COUNTY STREAM GROUP, 
CALIF. 
Location. Reservoirs and channel improvements are 
on Bear, Burns, Mariposa, and Owens Creeks, in 
foothills of Sierra Nevada about 15 to 20 miles east of 
city of Merced, Calif. (See Geological Survey Haystack 
Mountain quadrangle for Burns and Indian Gulch 
quadrangle for Bear, Owens, and Mariposa areas.) 
Existing project. For description of completed improvements 
and authorizing act, see Annual Report for 
1962. Improvements consist of Mariposa, Owens, 
Burns, and Bear Reservoirs and diversions from Black 
Rascal Creek to Bear Creek and from Owens Creek to 
Mariposa Creek. Total first cost for project was $3,899, 
259, of which $2,751,259 was Federal and $1,148,000 
non-Federal for lands including relocations and 
channel improvement. 
Local cooperation. Fully complied with. 
1064

SACRAMENTO, CALIF., DISTRICT 
Operations and results during fiscal year. Maintenance: 
Ordinary maintenance and operation of the four 
completed reservoirs continued at costs as follows: 
Mariposa $5,268; Owens $4,393; Bear $4,952; and 
Burns $6,052. Structures were maintained in a serviceable 
condition. Runoff from drainage areas above 
Merced County stream group reservoirs was near 
normal for the year. (See table 35-H for maximum 
inflow storage and outflow for projects.) Outflows were 
less than channel capacity rates in the project streams. 
Projects prevented an estimated $1,300,000 in damages 
from the January 1970 flood. 
Condition at end offiscalyear. Construction was initiated 
March 1948, with construction of Mariposa Dam and 
Reservoir, which was completed in November 1948. 
Construction of Owens Dam and Reservoir, initiated 
in March, was completed in October 1949; Burns Dam 
and Reservoir, initiated in July 1949 was completed in 
January 1950; and Bear Dam and Reservoir, initiated 
in April, was completed in December 1954. Black 
Rascal and Owens Creek diversion channels and 
stream-gaging stations were completed in April 1956. 
Local interests completed channel enlargement and 
restoration of channel capacities of Miles, Burns, 
Owens, and Mariposa Creeks in 1956 at their expense. 
Improvement of Bear Creek and Black Rascal Slough, 
below their confluence, was deferred pending possible 
improvements downstream, outside limits of project. 
22. MERCED RIVER, CALIF. 
Location. A tributary of San Joaquin River, northeast 
of town of Merced, Calif. (See Geological Survey 
topographic maps of the area.) 
Existing project. Federal interest in development is in 
flood protection afforded by multiple-purpose New 
Exchequer Reservoir. For description of improvement 
and authorizing act, see Annual Report for 1969. 
Estimated cost (July 1970) for project is $27,910,000, of 
which $10,560,000 is Federal cost, comprising $10,450, 
000 direct Federal contribution to local interests and 
$110,000 incidental Federal cost for engineering and 
administration of funds. Amount is based upon cost 
allocation studies approved by the President of the 
United States April 27, 1964. Total Federal contribution 
is based on 37.6 percent of actual construction 
cost of New Exchequer Dam and Reservoir, including 
all necessary relocations, but exclusive of cost of power 
and recreation facilities; however, the Federal contribution 
is limited to $19,400,000. Non-Federal cost 
included in the above amount is $17,350,000. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Minor engineering 
continued. Runoff of Merced River above 
New Exchequer was near normal for the year. 
Maximum storage of 1,026,200 acre-feet occured July 
15, 1969, as a result of the large April-July 1969 
snowmelt runoff. Maximum daily inflow to New 
Exchequer Reservoir of 14,700 cubic feet per second 
occured on January 16, 1970. Maximum daily outflow 
occured on July 7, 1969, and was 3,335 cubic feet per 
second. 
Condition at end of fiscal year. Merced Irrigation District 
initiated construction in June 1964; closure began in 
March 1965 and was completed in April 1966. Dam 
was completed in September 1966. As of June 30, 1969, 
total Federal contribution of $10,075,000 has been 
made to Irrigation District. 
23. MORMON SLOUGH, CALAVERAS 
RIVER, CALIF. 
Location. A distributary of Calaveras River, heads 
near town of Bellota, about 17 miles east of city of 
Stockton, Calif. Flows southwesterly to about 4 miles 
upstream from Stockton where it is diverted into 
Calaveras River through Stockton Diverting Canal. 
(See Geological Survey Sheet, Stockton quadrangle.) 
Existing project. For description of improvement and 
authorizing act, see Annual Report for 1969. Estimated 
cost (July 1970) is $5,434,000, of which $2,717,000 is 
Federal and $2,717,000 is non-Federal. Local interests 
also expended about $200,000 for construction of low 
levees in intermittent reaches along Mormon Slough, 
the diverting canal, and Calaveras River to provide 
some local flood protection. This protection is inadequate 
during major floods. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New work: 
Continuing contract for bank protection on Lower 
Calaveras River, San Joaquin River to McAllen Road 
Bridge completed at cost of $314,127, of which $250, 
058 was Federal and $64,069 was contributed funds, 
other. Initial Federal contribution of $165,000 was 
made in June 1970. Project prevented an estimated 
$300,000 in damages from the January 1970 flood. 
Condition at end of fiscal year. Construction was initiated 
in October 1967 and completed in February 1970. All 
levee construction (25.2 miles), channel improvement 
(14.2 miles), and the 3 interior drainage pumping 
plants have been transferred to and accepted by local 
interests, who have accepted maintenance responsibility 
for the project as well as for Stockton and 
Mormon Channels (Diverting Canal), Calif., Improvment 
No. 5. Final cash contribution to local 
interests is scheduled for next fiscal year. 
24. NEW BULLARDS BAR RESERVOIR, 
CALIF. 
Location. On North Yuba River about 30 miles 
northeast of city of Marysville, Calif. (See Geological 
Survey quadrangles for area.) 
Existing project. Federal interest in development is in 
flood protection afforded by multiple-purpose New 
Bullards Bar Reservoir constructed in Yuba County by 
the Yuba County Water Agency. The 645-foot high 
concrete arch type dam creates a reservoir with gross 
1065

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
storage capacity of 930,000 acre-feet for flood control, 
irrigation, power generation, general recreation, fish 
and wildlife, and other purposes. Federal contribution 
is based on flood control reservation of 170,000 acrefeet. 
Facilities for generating 330,700 kilowatts of 
hydropower (Colgate and New Narrows Powerplants) 
are included in the improvement. Approved cost 
estimate (July 1970) for existing project is $164,100, 
000, of which $13,100,000 is Federal cost, comprising 
$12,900,000 direct Federal contribution to local 
interests and $200,000 incidental Federal cost for 
engineering and administration of funds. Total Federal 
contribution is based on 11.5 percent of actual cost of 
construction of New Bullards Bar Dam and Reservoir, 
exclusive of power and recreation facilities. Non- 
Federal cost included in above amount is $99,270,000 
for construction of New Bullards Bar Dam and 
Reservoir exclusive of above Federal contribution, 
power, and recreation facilities. Existing project was 
adopted by 1965 Flood Control Act (H. Doc. 180, 89th 
Cong., 1st sess., contains latest published map). 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New work: 
Engineering was continued. Federal contribution of $4, 
500,000 was made to Yuba County Water Agency. 
Water Agency completed construction of New Bullards 
Bar Dam. First powerplant unit went on the line in 
April 1970; Water Agency expects that project will be 
ready for flood control operation by fall of 1970. 
Condition at end of fiscal year. Yuba County Water 
Agency initiated construction in June 1966, completed 
construction of the project in December 1969 and put 
power on the line as of April 1970. As of June 30, 1970, 
total Federa 1 contribution of $12,225,657 has been 
made to the Water Agency. 
25. NORTH FORK, PIT RIVER, AT 
ALTURAS, CALIF. 
Location. North Fork Pit River drains an area of 211 
square miles south of Goose Lake on the western slopes 
of the Warner Mountains. Runoff from the area 
converges on the restricted channel through the city of 
Alturas in Modoc County, California. Most of the 
North Fork basin is located in the Modoc National 
Forest. 
Existing project. Provides for limited enlargement and 
rectification of channel through city of Alturas and 
some enlargement of the North Fork downstream to its 
confluence with the South Fork. Estimated (July 1970) 
cost for project is $1,320,000, of which $1,000,000 is 
Federal cost (including $41,800 for preauthorization 
studies) and $320,000 is non-Federal cost. Existing 
project approved by Chief of Engineers August 22, 
1967, under provisions of section 205, 1948 Flood 
Control Act, as amended. 
Local cooperation. Local interests must bear all project 
costs in excess of Federal limitation of $1,000,000; 
furnish all lands, easements, rights-of-way, and relocations 
necessary for the project (exclusive of railroad 
facilities); hold and save the United States free from 
damages; operate and maintain the completed works 
at their own expense in accordance with prescribed 
rules and regulations; and prevent future encroachment 
which might interfere with proper functioning 
of project for flood control. Formal assurances 
furnished by the Board of Modoc County Supervisors 
were accepted by the District Engineer 1 December 
1967. Rights-of-way requested from Modoc County on 
March 7, 1968, were received on July 30, 1969. 
Operations and results during fiscalyear. Engineering was 
continued. Lengthening of S.P.R.R. bridge was initiated 
and completed under reimbursable contract 
with that company, $20,701. Channel improvement 
and levee construction contract was initiated in June 
1970. Had the project been in operation, damages 
estimated at $80,000 from the January 1970 flood 
would have been prevented. 
Condition at end of fiscal year. Construction was initiated 
in August 1969 and is about 20 percent complete. 
26. OROVILLE RESERVOIR, CALIF. 
Location. Dam is on Feather River, a tributary of 
Sacramento River in Butte County, Calif., about 4 
miles northeast of town of Oroville, and about 70 miles 
above mouth of Feather River. (See Geological Survey 
topographic maps of area.) 
Existing project. Federal participation consists of a 
contribution toward first cost of Oroville Reservoir 
project, exclusive of cost of power facilities, in an 
amount commensurate with flood control benefits to be 
attained. Federal contribution is based on provision of 
a maximum of 750,000 acre-feet of reservoir storage 
space from mid-October to first of April for flood 
control operation of Oroville Reservoir. Oroville 
Reservoir is a multiple-purpose storage reservoir for 
municipal and industrial water supply, power generation, 
irrigation, flood control, and other purposes. 
The dam is a 770-foot high earth and rockfill structure 
with a total crest length of 6,850 feet, creating a 
reservoir with a capacity of about 3,538,000 acre-feet. 
Included in improvement are power-generating facilities 
of 600,000 kilowatts capacity. Approved cost 
estimate (July 1970) is $317,850,000 (exclusive of 
power facilities), of which $69,830,000 is Federal 
contribution toward new work, exclusive of $450,000 
incidental Federal costs for engineering and administration 
of funds in connection with flood control 
reservation. Amount is based upon cost allocation 
studies completed in fiscal year 1961 and approved by 
the President of the United States onJanuary 10, 1962. 
Total Federal participation is based on 22 percent of 
actual construction cost exclusive of cost of power and 
recreation facilities; however, the Federal cost is 
limited to $85 million including actual Federal cost for 
engineering and administration of funds and interest at 
3.5 percent per annum on actual Federal expenditures 
1066

SACRAMENTO, CALIF., DISTRICT 
during construction period. Non-Federal cost included 
in the above project amount is $247,570,000, for 
construction of dam and reservoir. Existing project was 
adopted by 1958 Flood Control Act (H. Doc. 434, 87th 
Cong., 2d sess., contains latest published map). 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New work: 
Minor engineering continued. Additional Federal 
contribution of $116,035 was made to the State. Project 
prevented an estimated $2,000,000 in damages from 
the January 1970 flood. 
Condition at end of fiscal year. State of California began 
relocations in May 1957 and initiated main dam 
contract in January 1963. Closure of main dam was 
completed October 6, 1967. Initial power unit went on 
line March 6, 1968, in Thermolito plant and the first 
Oroville plant unit went on line March 28, 1968. Dam 
was completed in September 1968. Final power units 
went on line July 20, 1969. As of June 30, 1970, total 
Federal contribution of $66,648,500 has been made to 
the State. 
27. PINE FLAT RESERVOIR AND KINGS 
RIVER, CALIF. 
Location. Reservoir is on Kings River, about 25 miles 
east of Fresno, Calif., and channel improvements are 
on Kings River downstream from Lemoore weir, about 
25 miles south of Fresno. (See Geological Survey 
quadrangles of area.) 
Existing project. Improvement is a unit in comprehensive 
plan for flood control and other related 
purposes for Sacramento-San Joaquin Basins. Project 
consists of a 429-foot high concrete gravity dam, 
including a gated overflow section with a maximum 
discharge capacity of 391,000 cubic feet per second, 
creating a reservoir with gross storage capacity of 1 
million acre-feet, for flood control, irrigation, and 
related purposes. Outlet provisions for future power 
development are included in dam, but Federal 
construction of power-generating facilities is not 
authorized. Improvement also includes a limited 
amount of channel improvement on Kings River and 
its distributaries on valley floor about 25 miles south of 
Fresno. Channel improvement work will enlarge 
channel capacities and regulate flows in lower branches 
of the Kings River. There are nine public-use and 
recreation areas: one maintained by the Corps, four by 
the Forest Service, three jointly by the Corps and 
concession, and one by Fresno County. Also, five boat 
access-only areas are maintained by the Corps on the 
south side of reservoir. Approved cost estimate (July 
1970) is $41,235,000, of which $40,685,000 is Federal 
(including $13,700 for basic recreation facilities) and 
$550,000 non-Federal for rights-of-way for downstream 
channel improvements. For future non-Federal 
reimbursement, see Local cooperation paragraph. Estimated 
Federal cost of recreation facilities for Pine 
Flat Reservoir, to be funded from Code 710 appropriations 
is $920,100 (July 1970) exclusive of 
recreation facilities previously provided at a cost of $13, 
700. In addition, Federal cost of recreation facilities for 
Pine Flat Reservoir, funded from Public Works 
Acceleration Executive Act of 1962 appropriations, 
was $239,235 (July 1963), exclusive of recreation 
facilities provided from regular project and Code 710 
funds. Operation and maintenance of dam and 
reservoir is Federal responsibility. Existing project was 
adopted by 1944 Flood Control Act (H. Doc. 630, 76th 
Cong., 3d sess., contains latest published map). 
Local cooperation. Local interests must reimburse the 
Federal Government for first costs allocated to irrigation 
functions of reservoir portion of project in 
accordance with reclamation law. Under provision of 
War Department Civil Appropriations Act of 1947, the 
Secretary of War, with concurrence of the Secretary of 
the Interior, determined allocation of cost to irrigation 
should be set at an amount not to exceed $14,250,000. 
In addition, local interests must pay 37.4 percent of 
annual maintenance, operation, and replacement costs 
of dam and reservoir allocated to irrigation function. 
Repayment contracts between Bureau of Reclamation 
and the local water users for the irrigation use of the 
reservoir were executed December 23, 1963. Bureau is 
administering the contracts in accordance with reclamation 
law; however, local interests are testing in 
court the validity of reclamation law in regard to the 
Pine Flat contracts. Prior to execution of the final 
contracts, the Bureau provided conservation water to 
local interests under an interim contract. Irrigation 
interests paid $10,502,527 for irrigation services 
through June 30, 1969. With respect to the downstream 
channel improvements, section 3, Flood Control Act of 
June 22, 1936, applies. Kings River Conservation 
District represents local interests; assurances were 
accepted November 20, 1959. Local interests have 
furnished all requirements for construction rights-ofway 
for construction of channel improvements required 
to date. Three concessionaires--one each at 
Lakeridge Marina (Deer Creek), Lakeview Marina 
(Lombardo's Fishing Village), and Trimmer Marina 
provided public-use facilities in accordance with lease 
agreements with the Secretary of the Army. Estimated 
cost of facilities installed by these concessionaires is 
$309,000. Fresno County developed public-use facilities 
on an 85-acre tract immediately downstream 
from dam for picnicking, camping, swimming, and 
playground activities, at an estimated cost of $88,500 
under provisions of a license agreement. Forest Service 
operates a picnic area at upper end of reservoir and two 
campgrounds and a picnic area at sites along reservoir 
perimeter. Total cost of development of these sites is 
about $37,500. 
Licenses. License No. 1988, effective April 1, 1955, 
was issued by Federal Power Commission to Pacific 
Gas and Electric Co. for hydroelectric power development 
of North Fork Kings River by the company 
upstream from Pine Flat Reservoir. Under interim 
1067

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Contract No. DA-04-167-eng-1182 with the Department 
of the Army, Pacific Gas and Electric Co. 
paid for storage of power water in Pine Flat Reservoir 
May 15, 1954, through March 31, 1955. Current 
Contract No. DA-04-16 7-eng-13 28 with the Department 
of the Army provides for storage of power 
water at the rate of 0.1375 per acre-foot; the contract 
covers April 1, 1955, through March 31, 2005. Total 
payment under these contracts through June 30, 1970, 
amounts to $2,200,774; these funds are paid to 
Sacramento District and deposited for return to the 
Treasury. 
Operations and results during fiscal year. New work, 
regular funds: Engineering and design continued, $49, 
971. Miscellaneous minor work in connection with 
channel improvement continued by hired labor. Code 
710 funds: None. Maintenance: Maintenance and 
operation activities continued with condition and 
operation studies at a cost of $71,107 and major 
maintenance costs as follows: dam and reservoir $69, 
069; service facilities $29,362; and recreation facilities 
$74,657. Structures were maintained in serviceable 
condition. Runoff of Kings River above Pine Flat Dam 
was near normal for the year. Maximum storage of 998, 
700 acre-feet on July 22, 1969, resulted from the 
extremely large April-July 1969 snowmelt season 
runoff. Maximum bihourly inflow to Pine Flat Reservoir 
was 19,200 cubic feet per second on January 16, 
1970. Maximum outflow of 17,761 cubic feet per 
second occurred on July 1, 1969. Flood control releases 
from July 1, 1969, through August 4, 1969 totaled 622, 
300 acre-feet during December 1969 and January- 
February 1970 flood control releases totaled 135,800 
acre-feet. Water released for flood control totaled 758, 
100 acre-feet for the year. Release of water for 
irrigation and spreading totaled 1,416,500 acre-feet. 
Project prevented an estimated $600,000 in damages 
from the January 1970 flood. 
Condition at end of fiscal year. Construction began in 
April 1947 and project is about 99 percent complete. 
Construction of main dam was initiated in January 
1950 and completed in June 1954. Dam has been 
operating since February 1954 to provide flood 
protection for which it was designed. Recreation 
facilities for various recreation areas under Code 710 
appropriation initiated in fiscal year 1960 are 42 
percent complete. Work remaining consists of provision 
of minor channel improvements, and completion of 
recreation facilities in connection with overall development 
of reservoir area. 
28. SACRAMENTO RIVER AND 
TRIBUTARIES, CALIF., FROM 
COLLINSVILLE TO SHASTA DAM 
Location. Rises in Trinity Mountains in north-central 
California, flows generally southerly about 374 miles 
and empties into Suisun Bay, an arm of San Francisco 
Bay at Collinsville, Calif. Works covered by this 
improvement are on Sacramento River and tributaries 
from Collinsville to Shasta Dam, about mile 312. 
Drainage area above Rio Vista is 26,500 square miles. 
(See Geological Survey quadrangles of area for 
Sacramento River and upper Butte Basin; Flournoy 
and Fruto quadrangles for Black Butte Reservoir; and 
Tuscan Buttes, Tehama, Redding, and Hooker quadrangles 
for Table Mountain Reservoir.) 
Existing project. Improvement of Sacramento River 
and tributaries, from Collinsville to Shasta Dam was 
authorized as a unit of a comprehensive plan for flood 
control and other related purposes in Sacramento 
River Basin. (a) Sacramento River and major and 
minor tributaries, for flood control purposes: Enlargement 
of existing levees on Sacramento River 
between vicinity of Moulton weir and Ord Bend; 
construction of new levees from present levee terminus 
to vicinity of Chico Landing; construction of a weir 
near Chico Landing, extension of Moulton weir, and 
construction of a bypass through Upper Butte Basin; 
construction of new levees in Lower Butte Basin; 
enlargement of existing levees in Sutter, Tisdale, 
Sacramento, and Yolo Bypasses; and levee construction 
and/or channel enlargement on following 
minor tributaries of Sacramento River: Antelope 
Creek; Chico and Mud Creeks and Sandy Gulch; 
Butte and Little Chico Creeks; Cherokee Canal; Elder 
Creek; Deer Creek (Tehama County); Thomes Creek; 
and Willow Creek. Improvement provides for about 
155 miles of channel improvement and about 294 miles 
of levees with an average height of 12 feet and a 
freeboard of 3 feet. Improvement also provides for 
revetment as required for protection of bypass levee 
slopes against erosion. Total first cost for project is $18 
million (July 1970), of which $11,900,000 is Federal, 
and $6,100,000 non-Federal for lands and damages, 
including relocations. (See table 35-I on project units 
classified and excluded from cost estimate.) (b) 
Construction of about 33,000 feet of bank protection 
and minor channel improvements as required on 
Sacramento River between Chico Landing and Red 
Bluff, for flood control purposes. Improvement also 
contemplates flood plain zoning between Chico Landing 
and Keswick Dam to assure maintenance of present 
project floodway areas. Estimated first cost (July 1970) 
for project work in Tehama County, was $1,067,654, of 
which $975,654 was Federal cost and $92,000 non- 
Federal for lands and damages including relocations. 
Construction in Butte and Glenn Counties is considered 
inactive and excluded from foregoing cost 
estimate. Estimated cost of this construction (July 
1963) is $1,175,000, of which $1,060,000 was Federal 
and $115,000 non-Federal for lands and damages 
including relocations. (c) Sacramento River, Calif., 
bank protection-Addition of about 430,000 lineal feet 
of bank erosion control works and setback levees at 
critical locations existing at time of report or expected 
to develop in 10 years, within limits of authorized or 
existing levees included in Sacramento River flood 
1068

SACRAMENTO, CALIF., DISTRICT 
control project, as initial phase of a long-range 
program to protect integrity of levee system, for flood 
control purposes. Total estimated (July 1970) first cost 
for this initial phase of project is $39,600,000, of which 
$26,400,000 is Federal (including $550,000 for recreation 
facilities) and $13,200,000 non-Federal comprising 
$11,000,000 for lands and damages including 
relocations and $2,200,000 required cash contribution 
toward first cost. Construction in (a), (b), and (c) above 
supplements program of levee improvements which is 
being accomplished pursuant to 1917 Flood Control 
Act, as amended by subsequent acts, including 1941 
Flood Control Act, and which are reported by 
California Debris Commission under Sacramento 
River, Calif., flood control. (d) Authorization also 
provided for Black Butte Reservoir by construction of 
an earthfill dam, with a maximum height of 156 feet, to 
create a reservoir with gross storage capacity of 160,000 
acre-feet for flood control, irrigation, and related 
conservation purposes. Improvement is in Tehama and 
Glenn Counties about 9 miles westerly of Orland, 
Calif., on Stony Creek, a tributary entering Sacramento 
River at mile 190. Estimated (July 1970) 
Federal first cost for project is $14,515,000, including 
$468,000 for basic recreation facilities. For future non- 
Federal reimbursement, see Local cooperation paragraph. 
Approved estimated Federal cost for additional recreation 
facilities to be funded from Code 710 appropriations 
is $907,000. (e) Authorization also provided 
for construction of Table Mountain (Iron 
Canyon) Reservoir, an earthfill dam, with a maximum 
height of 210 feet, to create a reservoir with gross 
storage capacity of 503,000 acre-feet, for flood control, 
water conservation, and power generation. Reservoir 
would be on Sacramento River at about mile 250, 
about 3 miles north of Red Bluff, in Tehama and 
Shasta Counties, Calif. This project unit was reclassified 
and is in a deferred status. Estimated Federal 
cost of this unit, including power facility, (July 1954) is 
$77,200,000. Local interests would be required to pay 
the portion of first cost and annual operation and 
maintenance cost allocated to conservation functions of 
the project. These costs have not been determined. (See 
table 35-B for authorizing legislation.) 
Local cooperation. (a) Sacramento River and major 
and minor tributaries: Section 3, Flood Control Act of 
June 22, 1936, applies. Fully complied with for all work 
completed or under contract, and local interests 
indicated they will be able to fulfill requirements for 
remaining work as scheduled. Levee construction (107 
miles) on the "active" project has been completed, 
transferred to, and accepted by the State. (b) Sacramento 
River, Chico Landing to Red Bluff: Section 3, 
Flood Control Act of June 22, 1936, applies; local 
interests must also assume responsibility for flood plain 
zoning. Fully complied with for portion completed in 
Tehama County; completed work was transferred to 
and accepted by the State. Flood plain zoning 
ordinances were rejected by Butte County Board of 
451-584 0-72-68 
Supervisors in July 1961 and by Glenn County 
residents in September 1963. Accordingly, work in 
Butte and Glenn Counties is classified inactive. (c) 
Sacramento River, Calif., bank protection: Section 3, 
Flood Control Act of June 22, 1936, applies. Local 
interests must also contribute an amount in cash that, 
when added to costs of lands and rights-of-way and 
utility modifications, equals one-third of cost of each 
unit of remedial work; this contribution is estimated 
(July 1970) at $2,200,000. Local interests fully complied 
with requirements for all work completed or 
under contract, and indicated they will be able to fulfill 
requirements for remaining work as scheduled. In 
addition, for reaches where local interests request bank 
stabilization in lieu of more feasible levee setbacks, 
local interests will contribute costs over and above costs 
of setbacks, and provide local contribution indicated 
above. Completed units transferred to and accepted by 
the State. (d) Black Butte Reservoir: None required for 
construction. Local interests must pay the portion of 
first cost and annual operation and maintenance costs 
allocated to the conservation functions of the project; 
these costs are estimated at 39.9 percent of first cost and 
40.2 of annual costs. Contract between Bureau of 
Reclamation and State of California for repayment of 
costs of irrigation storage was executed March 2, 1960; 
the Bureau administers the contract in accordance 
with reclamation law. Local interests have paid a total 
of $72,037 for irrigation services through December 31, 
1969. (e) Table Mountain (Iron Canyon) Reservoir: 
None required for construction. Local interests must 
pay for portion of first cost and annual operation and 
maintenance cost allocated to conservation functions of 
project; since the project is in a deferred status, these 
costs have not been determined. 
Operations and results during fiscal year. New work: (a) 
Sacramento River and major and minor 
tributaries-Engineering and design continued by 
hired labor, $21,606. Contract for bypass levee revetment, 
east levee, Yolo Bypass, was awarded June 23, 
1970. Project prevented an estimated $2,000,000 in 
damages from the January 1970 flood. (b) Sacramento 
River, Calif., bank protection-Engineering and 
design, including preparation of plans and specifications, 
continued by hired labor at a cost of $235, 
718, all of which was Federal. (See table 35-J for 
construction accomplished and contract costs.) Project 
prevented an estimated $300,000 in damages from the 
January 1970 flood. (c) Sacramento River, Chico 
Landing to Red Bluff-New work: Engineering was 
continued. Stone protection on left bank Sacramento 
River near Tehama was initiated by contract, $15,412. 
Project prevented an estimated $200,000 in damages 
from the January 1970 flood. (d) Black Butte Reservoir, 
New work, regular funds: Minor hired labor. 
Code 710 funds: Engineering was continued. Maintenance: 
Maintenance and operation activities continued 
with condition and operation studies at a cost of 
$56,324 and major maintenance costs as follows: dam 
)69

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
and reservoir $43,093; service facilities $17,016; and 
recreation facilities $73,757. Structures were maintained 
in serviceable condition. Runoff above Black 
Butte Dam was near normal for the year. Maximum 
storage of 131,900 acre-feet occurred January 27, 1970. 
Release of water for irrigation totaled 227,200 acre-feet 
and flood control releases of 488,200 acre-feet were 
made. Maximum bihourly inflow to Black Butte 
Reservoir was 35,900 cubic feet per second on January 
24, 1970, and maximum outflow of 12,933 cubic feet 
per second occurred on January 24, 1970. Project 
prevented an estimated $1,900,000 in damages from 
the January 1970 flood. 
Condition at end of fiscal year. (a) Major and minor 
tributaries (active portions): Construction was initiated 
in May 1949 on Deer Creek and Butte Creek units; 
Cherokee Canal, Elder Creek, Chico and Mud Creeks, 
and Sandy Gulch units have been completed. Active 
portion of this improvement is about 89 percent 
complete. Work remaining is completion of bypass 
levee revetment. (b) Sacramento River, Calif., bank 
protection: Construction of first unit was initiated in 
June 1963; project is 54 percent complete. Work 
remaining to complete improvement includes completion 
of work underway and provision of additional 
bank erosion control works and setback levees at 
critical locations now existing or expected to develop 
during authorized construction period. (c) Sacramento 
River, Chico Landing to Red Bluff: Active portion of 
project, bank protection in Tehama County, was 
initiated in June 1963 and completed in March 1964. 
Project was reopened in June 1968 to place additional 
necessary bank protection. Bank protection in Tehama 
County reach was completed in October 1968. Work 
authorized in Butte and Glenn Counties was reclassified 
inactive in October 1963 pending receipt of 
local cooperation requirements for these counties. (d) 
Black Butte Reservoir: Construction began in March 
1960 and project is complete except for final settlement 
of land acquisition. Construction of Main dam was 
initiated in June 1960 and completed in December 
1963. Dam has been operating since November 1962 to 
provide the flood protection for which it was designed. 
29. WALNUT CREEK, CALIF. 
Location. Project is on Walnut Creek and lower 
reaches of its principal tributaries, Pacheco, Grayson, 
San Ramon, and Las Trampas Creek, in Contra Costa 
County, Calif. Improvement will extend from Suisun 
Bay to head of project about 1 mile above southern 
limits of city of Walnut Creek. City of Walnut Creek is 
about 10 miles south of Suisun Bay. (See Geological 
Survey quadrangles for area.) 
Existing project. Comprises extension of existing levees, 
construction of new levees and concrete channels, 
construction of pumping plants for disposal of interior 
drainage, channel rectification and enlargement, and 
utilization of improvements constructed or planned by 
local interests. Plan provides for about 14.3 miles of 
channel improvement, two reinforced-concrete drop 
structures, one stilling basin, 13.8 miles of levees, and 
one pumping plant. Approved cost estimate (July 
1970) is $31,500,000, of which $22,300,000 is Federal 
and $9,200,000 non-Federal consisting of $7,400,000 
for lands and damages and relocations except railroad 
facilities, and $1,800,000 required cash contribution for 
land enhancement benefits provided by the project. 
Local interests have also expended about $2 million for 
flood control in the project area during the past 10 
years, including concrete conduits constructed through 
city of Walnut Creek by local interests at an estimated 
cost of $1,500,000, considered a preproject condition to 
be incorporated in the Corps project and cost thereof is 
not included in above costs of local cooperation. 
Improvement adopted by 1960 Flood Control Act (H. 
Doc. 76, 86th Cong., 1st sess., contains latest published 
map). 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies, except that relocation of railroad 
facilities is a Federal responsibility. In addition, local 
interests must make a cash contribution to the United 
States, in amount of 7.4 percent of cost of construction 
for land enhancement benefits provided by project. 
Cash contribution is estimated (July 1970) at $1,800, 
000. Local interests are represented by Contra Costa 
County Flood Control and Water Conservation District; 
formal assurances, including evidence of financial 
and legal ability to fulfill requirement for the cash 
contribution, were accepted by the Sacramento District 
Engineer November 15, 1963. Flood Control 
District furnished all rights-of-way required to date 
and indicated that it will furnish all requirements as 
needed for future construction. Flood Control District 
will arrange for highway bridge modifications and 
utility relocations before start of work by the Corps 
contractor or the work will be coordinated with that of 
the Corps contractor. Payment of required contributed 
funds will be made in installments in amounts equal to 
7.4 percent of the estimated construction expenditure 
for each fiscal year. To date $1,076,100 has been 
furnished. 
Operations and results during fiscal year. New work: 
Major work accomplished and fiscal year costs are set 
forth in table 35-K. 
Condition at end of fiscal year. Construction was initiated 
June 1964; project is about 61 percent complete. 
Planning continued and is closely coordinated with 
Soil Conservation Service. 
30. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Approved regulations for operation and maintenance 
of flood control works, part 208, title 33, Code 
of Federal Regulations provides for inspection of 
completed projects transferred to local interests for 
operation and maintenance to determine status of 
1070

SACRAMENTO, CALIF., DISTRICT 
project and insure compliance with regulations. During 
fiscal year, inspections were made of: Completed 
units of Sacramento River and major and minor 
tributaries; completed units of Sacramento River flood 
control project, Kings River Channel Improvement 
(Pine Flat Reservoir project), and Walnut Creek 
project; American River levees; Middle Creek; Duck 
Creek diversion, Littlejohn Creek, Mormon Slough, 
and Bear Creek, all in California; Truckee River, 
Calif. and Nev.; completed units of lower San Joaquin 
River and tributaries, Calif.; Big Dry Creek Reservoir 
and diversion, Calif.; Reese River, Battle Mountain, 
Nev.; Sevier River, Redmond and vicinity, Utah; 
various emergency flood control works under authority 
of section 208, Flood Control Act of June 30, 1948, and 
September 3, 1954; Public Law 99, June 28, 1955, and 
antecedent legislation; section 14 of Flood Control Act 
of July 24, 1946. Maintenance inspections conducted 
indicate that existing agreements and regulations are 
being complied with on completed flood control works. 
Continuing effort is required to improve maintenance 
practices and active steps are being taken by responsible 
State and local agencies to achieve desired 
results. Local agencies were advised, as necessary, of 
measures required to maintain these projects in 
accordance with standards prescribed by regulations. 
Total cost of inspection for fiscal year was $28,000. 
31. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with section 7, Flood Control Act of 
1944, summaries of monthly operations at Oroville, 
Folsom, Friant, Shasta, Ca manche, Wanship, Echo, 
Pineview, East Canyon, Lost Creek, Causey, Prosser 
Creek, Don Pedro, Cherry Valley, Hetch Hetchy, Los 
Banos Detention, Big Dry Creek, and New Exchequer 
Reservoirs were prepared and distributed. A report on 
Reservoir Regulation for Flood Control for New 
Bullards Bar Reservoir on Yuba River was continued. 
This report, in lieu of a reservoir regulation manual, 
will describe New Bullards Bar Reservoir and furnish 
details supporting the coordinated operation plan for 
New Bullards Bar, Oroville, and Marysville Reservoirs. 
A report on Reservoir Regulation for Flood 
Control at Truckee River Reservoirs was continued. 
This report will describe Truckee River Reservoirs and 
furnish details supporting the coordinated operation 
plan for Boca, Stampede, Martis Creek, and Prosser 
Creek Reservoirs. A report on Reservoir Regulation for 
Flood Control for Navajo Reservoir, San Juan River, 
New Mexico, was submitted for approval. Work was 
initiated on reports for reservoir regulation for flood 
control and drafts of proposed flood control regulations 
for Paonia, Lemon, Blue Mesa, and Vallecito Reservoirs, 
all in the Upper Colorado River system. Corps 
personnel provided advice as requested during flood 
control operations at all section 7 reservoirs. Fiscal year 
cost was $48,000. Total cost to June 30, 1970 was $292, 
723. 
32. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 35-L. 
33. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 
858, 80th Congress, as amended (Preauthorization) 
Fiscal year costs for preauthorization studies were 
$57 for Churn Creek, Shasta County, Calif.; $31,228 
for Colusa Basin Drainage Problem, Yolo County, 
Calif.; $17,533 for Kern River-California Aqueduct 
Intertie, Calif.; $12,459 for Barton and Mill Creeks, 
Utah. and $1,262 (expenses initially charged to 
revolving fund with later reimbursement under section 
205) for Stone Creek, Davis County, Utah. 
Emergency flood control activities-repairf,l ood fighting, and 
rescue work (Public Law 99, 84th Cong., and antecedent 
legislation) 
Federal cost for fiscal year was $3,101,892 of which 
$32,000 was for advance preparation, $1,094,763 for 
flood emergency operations, and $1,975,129 for repair 
and restoration. 
Emergency bank protection (sec. 14, 1946 Flood Control Act, 
Public Law 526, 79th Cong.) 
Federal cost for fiscal year was $4,292 for initiation 
of American River Bank Protection-sewage treatment 
plant near Rancho Cordova, Calif. 
Snagging and clearing navigable streams and tributaries in 
interest of flood control (sec. 208, 1954 Flood Control Act, Public 
Law 780, 83rd Cong.) 
Federal cost for fiscal year for snagging and clearing 
was $143,829. Snagging and clearing was completed on 
San Joaquin River below Friant Dam, Calif., ($69,136) 
; initiated and completed on Cornet Creek, Colo., ($9, 
625); continued on Gunnison River, Colo., ($3,250); 
and initiated on Little Chico Creek, Calif., ($1,531) 
and Sevier River, Utah, ($60,287). 
MULTIPLE-PURPOSE PROJECTS 
INCLUDING POWER 
34. MARYSVILLE RESERVOIR, CALIF. 
Location. On main stem of Yuba River about 11 miles 
northeast of city of Marysville, Calif. (See Geological 
Survey quadrangles for area.) 
Existing project. Provides for construction of (a) a 215- 
foot high earthfill dam to create a reservoir with gross 
storage capacity of about 1,000,000 acre-feet for flood 
control, irrigation, power, general recreation and fish 
and wildlife purposes, (b) a powerplant with installed 
capacity of about 50,000 kilowatts, and (c) a low, 
combination concrete and earthfill afterbay dam about 
19,200 feet long at Daguerre Point. Operation and 
maintenance of dam and powerplant will be the 
responsibility of the Federal Government. Approved 
cost estimate (July 1970) for existing project is $177, 
1071

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
000,000 all of which is Federal cost, including $2,600, 
000 for basic recreation facilities. For future non- 
Federal reimbursement, see Local cooperation paragraph. 
Existing project was adopted by 1966 Flood Control 
Act. (H. Doc. 501, 89th Cong., 2d sess.). 
Local cooperation. With respect to the dam and 
reservoir, local interests, represented by the State of 
California, must (a) reimburse the Federal Government 
the portion of joint use first costs allocated to 
water supply (36.0 percent) and to power (10.3 
percent) in addition to specific power costs (presently 
estimated at $23,200,000), (b) pay, contribute in kind, 
or repay (which may be through user fees) with 
interest, one-half of the separable cost of the project 
allocated to recreation and fish and wildlife, and (c) 
bear all costs of operation, maintenance, and replacement 
of recreation and fish and wildlife lands and 
facilities. (Public Law 89-72, The Federal Water 
Projects Recreation Act.) On June 29, 1966, the 
California Resources Agency stated its intention to 
provide necessary leadership in furnishing the assurances 
of local cooperation required by the Federal 
Water Project Recreation Act. 
Operation and results during fiscal year. New work: 
Preconstruction engineering studies and design memoranda 
were continued. 
Condition at end of fiscal year. Preconstruction planning 
was continued. 
35. NEW MELONES RESERVOIR, CALIF. 
Location. On Stanislaus River about three-quarters 
mile downstream from existing Melones Dam and 
about 35 miles northeast of city of Modesto. (See also 
Improvement No. 19 for Tuolumne River Basin and 
Lower San Joaquin River and tributaries.) (See 
Geological Survey quadrangles of the area.) 
Existing project. Provides for construction of (a) a dam 
to create a reservoir with gross storage capacity of 
about 2,400,000 acre-feet for flood control, irrigation, 
power, general recreation, fish and wildlife, and other 
purposes, and (b) a powerplant below the dam with an 
installed capacity of 300,000 kilowatts. Upon completion 
of construction of dam and powerplant by the 
Corps, the project shall become an integral part of 
Central Valley project and operated and maintained 
by the Secretary of the Interior pursuant to Federal 
reclamation laws, except that the flood control operation 
of the project shall be in accordance with rules 
and regulations prescribed by the Secretary of the 
Army. Maintenance of Stanislaus River channel from 
Goodwin Dam to San Joaquin River to a capacity of at 
least 8,000 cubic feet per second will also be Corps 
responsibility. Approved estimated (July 1970) Federal 
cost is $171 million. For future non-Federal reimbursement, 
see Local cooperation paragraph. In addition, 
local interests expended $300,000 for levees along lower 
reaches of Stanislaus River. Existing project was 
adopted by 1962 Flood Control Act (H. Doc. 453, 87th 
Cong., 2d sess., contains latest published map). This act 
modified original authorization adopted by 1944 Flood 
Control Act. (H. Flood Control Committee Doc. 2, 
78th Cong., 2d sess., contains latest published map.) 
The 1944 Flood Control Act authorized $8 million for 
partial accomplishment of project. Further monetary 
authorizations of $2,500,000, $5 million, $13 million, 
$2 million, $17 million, and $18 million were provided 
for this project by Public Laws 235 and 780, 83d 
Congress, and 85-500, 90-17, 90-483, and 91-282 
making a total monetary authorization of $65,500,000 
available for the basin plan comprising Lower San 
Joaquin River and tributaries, including Tuolumne 
and Stanislaus Rivers, Calif. 
Local cooperation. Based on approved preliminary cost 
allocation studies (July 1965) local interests will be 
required to pay 35.2 percent of first cost and 12.7 
percent of annual operation and maintenance costs 
allocated to irrigation. In addition, 31.1 percent of first 
cost and 62.5 percent of annual cost would be allocated 
to power. Local interests must also maintain existing 
private levees along Stanislaus River from Goodwin 
Dam to San Joaquin River and prevent encroachment 
on channel and floodway between levees so as to 
preserve safe carrying capacity throughout that reach 
of at least 8,000 cubic feet per second. Recovery of costs 
allocated to irrigation and power will be responsibility 
of Bureau of Reclamation. Reimbursement of costs will 
be in accordance with Bureau of Reclamation policies 
and procedures for the Central Valley project. State of 
California officially adopted project by chapter 918 of 
statutes of 1963, and by chapter 1438 of those statutes 
authorized State Reclamation Board to furnish required 
assurances. The Board, by letter dated December 
13, 1963, stated it will furnish required as 
surances when formally requested to do so. 
Operations and results during fiscal year. New work: 
Engineering studies pertaining to preparation of design 
memoranda were continued. Plans and specifications 
were continued for relocations, dam and appurtenances, 
powerplant, and diversion facilities. Total 
engineering costs, including contracts, were $754,580. 
Land acquisition activities were continued at cost of 
$133,136. Contract for diversion and multipurpose 
tunnel was awarded on June 17, 1970, on basis of a 300, 
000 kilowatt installation. Miscellaneous minor construction 
work in connection with dam and roads was 
continued by hired labor. 
Condition at end of fiscalyear. Construction was initiated 
in August 1966; project is about 7 percent complete. 
GENERAL INVESTIGATIONS 
36. SURVEYS 
See table 35-M. 
1072

SACRAMENTO, CALIF., DISTRICT 
37. COLLECTION AND STUDY OF BASIC 
DATA 
Flood plain information studies were made at fiscal 
year costs as follows: California: Kern River, vicinity of 
Bakersfield, $1,549; Sand and Cottonwood Creeks, and 
Lower Kaweah River, Visalia, $15,600; Sandy Creek, 
vicinity of Ford City and Taft, $32,000; Trout and 
Bijou Creeks, South Lake Tahoe, $759; Truckee River, 
Tahoe City, $23,000; Upper Truckee River, South 
Lake Tahoe, $897; Nevada: Truckee River-Truckee 
Meadows, Reno and Sparks, $29,634; Utah: American 
Fork River and Dry Creek (Upper Jordan River Basin) 
, $1,128; Barton, Mill, and Stone Creeks, $811; Burch 
Creek, South Ogden, $20,000; Jordan River Complex 
(Lower Jordan River Basin), $1,255; Ogden River and 
Mill Creek, Ogden, $102. 
Technical assistance was performed for other Federal 
Agencies as well as non-Federal Agencies in 
connection with Flood Plain Management Services 
Program at a fiscal year cost of $86,399. (See table 35- 
N on completed flood plain studies). 
38. RESEARCH AND DEVELOPMENT 
Fiscal year costs were $567,357, of which $11,073 
was for hydrologic studies; $421,162 for engineering 
studies consisting of ES-100, Hydrologic Engineering 
Center ($420,250), ES-627 Prototype Analyses- 
Structural Behavior of Concrete Structures ($543), 
and ES-852 Adhesive Protection Tests at Pine 
Flat Dam ($369); and $89,112 for plan formulation 
and evaluation studies, Recreation Design Criteria and 
Demand; and $46,010 for International Hydrologic 
Decade. 
1073

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 35-A COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
1. Old River, New Work: 
1074 
Calif. Approp. $ - $ - $ - $ - $ 23,185 
Cost - - - - 23,185 
Maint.: 
Approp. 48,800 87,119 22,276 26,704 631,764 
Cost 3,451 102,899 52,589 25,368 630,428 
2. Sacramento River, New Work: 
Calif. Approp. 219,000 100,000 109,000 20,900 40,331,1921 
Cost 174,270 152,694 23,786 128,497 40,330,5192 
Maint.: 
Approp. 847,900 858,448 1,013,168 1,061,888 17,067,5704 
Cost 534,626 1,034,536 1,219,663 1,015,523 16,985,867 
3. San Francisco Bay New Work: 
to Stockton, Calif. Approp. 100,000 100,000 54,800 250,000 504,8005 
(John F. Baldwin Cost 39,437 95,556 106,452 84,102 325,547 
and Stockton Ship 
Channels) 
4. San Joaquin River, New Work: 
Calif. Approp. - - - - 5,833,1177 
Cost - - - - 5,833,117 
Maint.: 
Approp. 380,000 219,887 265,249 51,522 6,486,232 
Cost 327,183 447,734 259,663 49,054 6,477,457 
5. Stockton and New Work: 
Mormon Channels Approp. - - - - 253,151 
(Diverting Canal), Cost - - - - 253,151 
Calif. Mtint.: 
Approp. 7,000 -6,307 -500 -500 218,854 
Cost 1,546 925 4,006 - 218,854 
6. Suisun Bay New Work: 
Channel, Calif. Approp. - - - - 200,9288,9 
Cost - - - - 200,9288 ,9 
Maint.: 
Approp. 214,000 105,605 51,470 177,336 2,650,60210 
Cost 317,649 81,045 113,883 164,056 2,637,32210 
7. Suisun Channel, New Work: 
Calif. Approp. - - - - 217,677 
Cost - - - - 217,677 
Maint.: 
Approp. - 94,397 13,750 141,852 731,70611 
Cost -5 89,192 18,958 128,736 718,588 
9. Buchanan Reser- New Work: 
voir, Chowchilla Approp. 261,000 750,000 - 167,000 1,762,397 
River, Calif. Cost 189,816 293,488 516,796 28,426 1,599,907 
10. Calaveras River New Work: 
and Littlejohn Approp. 119,000 89,482 101,000 67,500 22,900,45312 
Creek and Tribu- Cost 503,322 81,426 63,062 137,948 22,880,6101 
taries including Maint.: 
New Hogan and Approp. 194,000 196,443 226,000 262,721 1,299,588 
Farmington Reser- Cost 171,828 204,916 231,803 262,800 1,285,674 
voirs, Calif. 
(Federal Funds) 
(Contributed Funds, New Work 
Other) Contnrib. - - - - 871,05614 
Cost 11,471 - - 219 871,056 
11. Camanche Reservoir, New Work 
Calif. Approp. 110,000 377,000 - 63,000 10,070,000 
Cost 98,963 390,979 1,708 64,208 10,069,388 
13. Hidden Reservoir, New Work 
Fresno River, Approp. 282,000 400,000 200,000 343,000 1,936,452 
Calif. Cost 312,416 231,231 68,725 122,475 1,401,621

SACRAMENTO, CALIF., DISTRICT 
TABLE 35-A (Cont'd) 
See 
Section 
in Text Project 
14. Isabella Reservoir, 
Kern River, Calif. 
15. Kaweah and Tule 
Rivers including 
Terminus and 
Success Reservoirs, 
Calif. 
16. Kays Creek, Layton, 
Davis County, 
Utah 
17. Lakeport Reservoir, 
Scotts Creek, 
Calif. 
18. Little Dell 
Reservoir, 
Utah 
19. Lower San Joaquin 
River and Tributaries, 
including 
Tuolumne and 
Stanislaus Rivers, 
Calif. (Federal 
Funds) 
(Contributed 
Funds, 
Other) 
20. Martis Creek Reservoir, 
Martis 
Creek, Nev., and 
Calif. 
21. Merced County 
Stream Group, 
Calif. 
22. Merced River, 
Calif. 
23. Mormon Slough, 
Calaveras River, 
Calif. (Federal 
Funds) 
(Contributed 
Funds) 
24. New Bullards Bar 
Reservoir, Calif. 
25. North Fork, 
Pit River, at 
Alturas, Modoc 
County, Calif. 
(Contributed 
Funds, Other)2 4 
Funding 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
$ 154,370 $ 415,738 $ -2,096 $ 2,724 $ 23,091,55515 
208,239 
367,000 
363,532 
182,000 
252,775 
430,000 
329,957 
1,289,000 
1,334,731 
535,000 
574,816 
330,000 
230,649 
25,000 
13,307 
4,132,000 
3,732,800 
290,000 
99,025 
25,000 
25,000 
1,000,000 
991,874 
84,000 
2,537 
154,118 
402,986 
382,066 
140,500 
119,976 
270,578 
350,361 
5,300 
196 
100,000 
78,133 
889,000 
1,000,801 
115,000 
112,458 
700,000 
420,176 
3,500 
15,183 
369,000 
931,461 
833,900 
959,270 
508,000 
366,882 
3,565,000 
3,561,068 
34,022 
227,135 
383,700 
419,210 
88,500 
28,634 
330,389 
342,082 
2,500 
25,370 
291,000 
271,610 
926,400 
922,144 
57,500 
110,767 
830,000 
942,761 
23,238 
21,737 
500 
3,495 
1,206,000 
768,898 
110,000 
175,191 
3,284,000 
3,263,112 
150,000 
70,898 
110,000 
34,463 
350,459 
364,895 
141,900 
33,586 
363,793 
345,704 
250,000 
4,267 
349,000 
185,002 
400,000 
3,591 
1,340,000 
1,337,176 
36,000 
89,361 
520,000 
235,096 
23,372 
20,566 
1,000 
558 
489,543 
67,143 
4,500,000 
4,516,480 
600,000 
35,468 
23,074,56816 
2,955,606 
2,945,828 
34,384,6901$ 
34,117,0351 
2,115,235 
2,088,320 
307,80019 
59,93819 
740,000 
534,745 
400,000 
3,591 
23,990,86320 
23,930,965 
2,743,80021 
2,672,02321 
2,819,500 
2,264,137 
2,751,25922 
2,751,25922 
262,830 
258,513 
10,170,800 
10,170,358 
2,540,402 
2,526,639 
643,000 
634,217 
12,349,000 
12,332,534 
889,00023 
183,651 
110,000 
1075

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Cost to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
26. Oroville Reservoir, 
Feather River, 
Calif. 
27. Pine Flat Reservoir 
and Kings 
River, Calif. 
(Federal Funds) 
(Contributed 
Funds) 
Other2 8 
28. Sacramento River 
and Tributaries, 
Calif. from 
Collinsville to 
Shasta Dam 
(Federal Funds) 
(Required 
Contributed 
Funds) 
(Contributed 
Funds, Other) 
29. Walnut Creek 
Calif. (Federal 
Funds) 
(Required Contributed 
Funds)3 4 
(Contributed 
Funds, Other)3 s 
34. Marysville Reservoir, 
Calif. 
35. Lower San Joaquin 
River and Tributaries, 
Calif., including 
Tuolumne 
and Stanislaus 
Rivers, Calif. 
New Melones, 
Reservoir, Calif.3 6 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
$7,695,000 $9,250,000 $ 10,053,000 $ - $ 67,067,000 
7,688,471 9,251,021 9,935,959 122,329 67,059,178 
65,000 358,019 
54,769 369,758 
256,000 251,006 
236,863 281,937 
- 50,000 
-- 10,746 
883,000 
802,540 
246,000 
58,995 
286,535 341,913 
296,108 329,081 
45,500 
17,709 
-45,500 
10,388 
3,312,000 1,951,000 1,758,000 2,524,976 
2,990,105 2,365,248 1,521,854 2,373,620 
170,000 
159,036 
196,386 
195,070 
832,000 539,500 
842,942 660,671 
50 4,656 
3,015,000 2,562,100 
3,768,244 2,249,466 
239,700 
301,320 
109,660 
84,485 
115,000 
179,764 
157,000 
51,082 
100,000 
60,030 
200,338 233,798 
207,007 229,059 
751,000 320,000 
401,311 264,479 
1,807 
1,711,000 
1,910,002 
112,000 
154,005 
88,624 
756,200 
410,377 
1,630,000 
1,668,591 
11,400 
113,307 
29,000 
60,669 
760,000 
835,209 
2,415,000 2,690,000 2,000,000 800,000 
2,867,018 2,611,429 1,786,998 1,032,231 
41,404,03925, 
2 7 
41,124,53726, 2 7 
3,119,870 
3,102,146 
50,000 
38,843 
40,462,46229,30,31 
39,666,36329,30,31 
1,176,449 
1,164,906 
4,527,500 
4,101,073 
2,421,82833 
2,418,401 
13,465,500 
13,281,733 
1,076,100 
1,062,681 
385,660 
312,047 
1,616,200 
1,305,616 
10,467,80437 
10,203,863 
1. Includes the following amounts for new work: Regular 
funds-Previous project, $185,198; existing project, $585,436 
for shallow-draft and $39,560,558 for deep-draft. 
2. Includes the following amounts for new work: Regular 
funds-Previous project, $185,198; existing project, $585,436 
for shallow-draft and $39,559,885 for deep-draft. 
3. Includes the following amounts for maintenance: Regular 
funds-Previous project, $553,720; existing project, $12,126,837 
for shallow-draft and $4,317,013 for deep-draft; and deferred 
maintenance funds-$70,000 for shallow-draft. 
4. Includes the following amounts for maintenance: Regular 
funds-Previous project, $553,720; existing project, $12,099,528 
for shallow-draft and $4,262,619 for deep-draft; and deferred 
maintenance funds-$70,000 for shallow-draft. 
5. Includes $199,800 for Sacramento District and $305,000 
for San Francisco District. 
6. Includes $146,467 for Sacramento District and $179,080 
for San Francisco District. 
7. Includes $1,158,348 public work funds, of which 
$207,198 was for work done along 30-foot channel in Suisun 
Bay Channel; excludes $19,000 expended for engineering for 
inactive portion of 1950 modification. In addition, $1,343,750 
expended from required contributed funds, of which $1,342,500 
was for new work and $1,250 for maintenance. 
8. Includes $58,901 for previous projects. Excludes $59,551 
expended from required contributed funds for previous project. 
9. Excludes work accomplished under existing project at a 
cost of $207,198 from Public Works Administration funds 
allotted to San Joaquin River, California. 
10. Includes $59,817 for previous projects. Excludes $5,449 
expended from required contributed funds for previous project. 
1076

11. Includes reconnaissance and condition surveys as follows: 
FY 1963, $5,496; FY 1964, $483. 
12. Includes Code 710 funds for recreation facilities at New 
Hogan Reservoir Project: $95,000, $100,000, and -$70,000 for 
fiscal years 1968, 1969, and 1970, respectively. Total to date 
$173,000. 
13. Includes Code 710 funds for recreation facilities at New 
Hogan Reservoir Project: $53,838, $55,309, and $4,730 for 
fiscal years 1968, 1969, and 1970, respectively. Total to date 
$161,877. 
14. For miscellaneous construction under local cooperation 
requirements-primarily Bear Creek, San Joaquin County; includes 
$108,056 as related to Duck and Littlejohn Creeks 
channel improvements as part of Farmington Reservoir project 
unit. 
15. Includes total Code 710 funds for recreation facilities: 
$150,000, $385,000, and $9,200 for fiscal years 1967, 1968, 
and 1970, respectively. Total to date $1,064,102. 
16. Includes total Code 710 funds for recreation facilities: 
$173,678, $132,167, $225,721, and $34,463 for fiscal years 
1967, 1968, 1969, and 1970, respectively. Total to date 
$1,047,116. 
17. Includes Code 710 funds for recreation facilities: Success 
Reservoir, $592,000, and Terminus Reservoir $243,300. 
18. Includes Code 710 funds for recreation facilities: Success 
Reservoir, $344,637, and Terminus Reservoir, $229,305. 
19. Includes $30,000 for preauthorization studies. 
20. Excludes funds applicable to one unit of this basin 
authorization, which is Improvement No. 35, New Melones 
Reservoir, Calif. reported under Multiple-Purpose Including 
Power. 
21. Contributed funds for miscellaneous engineering and 
construction (nonproject) at expense of local interests under 
local cooperation requirements in connection with acquisition of 
rights-of-way for Lower San Joaquin River and tributaries-levee 
and channel improvements. 
22. In addition, $66,532 expended for new work from 
contributed funds, other, for miscellaneous construction under 
local cooperation requirements as related to acquisition of 
rights-of-way and utility alterations for project. 
23. Includes $41,800 for preauthorization studies. 
24. Miscellaneous construction and engineering and design 
services to be accomplished at expense of local interests under 
local cooperation requirement in connection with acquisition of 
rights-of-way, relocations, and utility alterations. 
25. Includes Code 710 funds for recreation facilities: $45,000 
and $36,000 for fiscal years 1967 and 1968, respectively. Total 
to date $500,100. 
26. Includes Code 710 funds for recreation facilities: 
$38,788, $45,473, and $10,293 for fiscal years 1967, 1968, and 
1969, respectively. Total to date $500,100. 
27. Includes Public Works Acceleration, Executive 
(PL 87-658) (Transfer to Corps of Engineers, Civil) 1963 funds 
for recreation facilities: Total appropriations $239,235 and total 
costs $239,235. 
28. Miscellaneous construction and engineering and design 
services (nonproject) accomplished at expense of State of 
California under local cooperation requirements in connection 
with acquisition of rights-of-way and utility alterations. 
29. Excludes $614,608 for Table Mountain (Iron Canyon) 
Reservoir which has been deferred and $531,000 for Sacramento 
River and major and minor tributaries portions which are 
considered inactive and deferred. 
30. Includes Code 710 funds for recreation facilities at Black 
Butte Reservoir: $20,000, $9,000, and $3,550 for fiscal years 
1968, 1969, and 1970, respectively. Total to date $32,500. 
31. Includes Code 710 funds for recreation facilities at Black 
Butte Reservoir: $17,184, $6,593, and $3,552 for fiscal years 
1968, 1969, and 1970, respectively. Total to date $27,239. 
32. Miscellaneous construction and engineering and design 
services (nonproject) accomplished at expense of State of 
California under local cooperation requirements in connection 
with acquisition of rights-of-way and utility alterations (primarily 
for Sacramento River and major and minor tributaries 
project). 
33. Includes State Highway Commission payment, $789,008, 
for use of excess excavation from Chico and Muc Creeks and 
Sandy Gulch (Sacramento River and major and minor tributaries) 
for freeway embankment through city of Chico. 
34. For land enhancement benefits provided by project. 
35. Miscellaneous construction and engineering and design 
services to be accomplished at expense of local interests under 
local cooperation requirements in connection with acquisition of 
rights-of-way and utility alterations. 
36. Excludes funds applicable to other units of this basin 
authorization (Lower San Joaquin River and tributaries and 
Tuolumne River Basin, Calif., which is Improvement No. 19, 
reported under Flood Control). 
37. Includes $110,000 utilized for preparation of 1957 
Economic Feasibility Report and of Revised Feasibility Report 
(FY 1960, 1961, and 1962) applicable to 1962 reauthorization 
of project. 
1077 
TABLE 35-A (Cont'd) 
SACRAMENTO, CALIF., DISTRICT 
COST AND FINANCIAL STATEMENT

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 3, 1899 
July 25, 1912 
Jan 21, 1927 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 26, 1937 
July 24, 1946 
Dec. 22, 1944 
May 17, 1950 
July 3, 1958 
July 3, 1958 
July 14, 1960 
May 12, 1967 
SACRAMENTO RIVER, CALIF. (See Section 2 of Text) 
A depth of 7 feet below Sacramento 
1899 
For work above Sacramento 
The 10-foot channel up to Sacramento. 
A depth of 6 feet between Sacramento and Colusa and 
5 feet between Colusa and Chico Landing, at a 
cost of $390,000 provided flow of rivers is increased 
to minimum flow of 5,000 cubic feet per 
second after Shasta Reservoir is built. 
Authority for a special direct participation of 
Federal Government of $12 million in cost of 
Shasta Reservoir. 
Transfer of authority for expenditure of above $12 
million from Secretary of War to Secretary of the 
Interior. 
Modified existing navigation project for Sacramento 
River, Calif., to provide for construction of a 
ship channel 30 feet deep and 200 to 300 feet wide 
from deep water in Suisun Bay to Washington Lake, 
including such works as may be necessary to compensate 
for or alleviate any detrimental salinity 
conditions resulting from ship channel; a triangular 
basin of equal depth 2,400 by 2,000 by 3,400 feet at 
Washington Lake; and connecting channel 13 feet 
deep and 120 feet wide, with lock and drawbridge, 
thence to Sacramento River. 
SACRAMENTO RIVER AND TRIBUTARIES, CALIF., FROM 
COLLINSVILLE TO SHASTA DAM (See Section 28 of Text) 
Modify Sacramento River Flood Control Project to 
provide for extensions in levees and other structures 
along Sacramento River and major and minor 
tributaries; construct Black Butte Dam and Reservoir; 
construct low-level Table Mountain Dam and 
Reservoir with power facilities; and provision of 
monetary authorization of $15 million for initiation 
of modification. 
Improvement for protection of Upper Butte Basin (included 
full monetary authorization). 
Extend existing Sacramento River Flood Control 
Project to Keswick Dam for purposes of zoning 
area below dam and modification of project by construction 
of bank protection and incidental channel 
improvements between Chico Landing and Red 
Bluff (included full monetary authorization). 
Additional authorization of $17 million for comprehensive 
plan approved in Act of December 22, 1944. 
Further modification of Sacramento River Flood 
Control Project by construction of initial 10- 
year phase of bank erosion control works and set 
back levees on Sacramento River and authorization 
of $14,240,000 for prosecution of modification. 3 
Additional authorization of $7 million for bank 
protection approved in Act of July 14, 1960. 
1. Contains latest published map of section above Sacramento. 
For map of section below Sacramento, see H. Doc. 1123, 
60th Cong., 2d sess. and S. Doc. 142, 79th Cong., 2d sess. 
2. Contains latest published map. 
3. Extension of bank protection beyond initial phase will 
require report on advisability of proceeding with additional work 
and authorization of that work. Total monetary authorization 
available, exclusive of preauthorization studies from general 
investigations appropriations, amounts to $56,740,000. 
1078 
TABLE 35-B 
H. Doc. 186, 55th Cong., 2d 
sess., and 48, 55th Cong., 
3d sess. (Annual Report 1898, 
p. 2844 and 1899, p. 3171). 
H. Doc. 76, 62d Cong., 1st sess. 1 
H. Doc. 123, 69th Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 35, 73d Cong., 2d sess. 
Rivers and Harbors Committee 
Doc. 35, 73d Cong., 2d sess. 
S. Doc. 142, 79th Cong., 2d sess. 
H. Doc. 649, 78th Cong., 2d 
sess.2 
H. Doc. 367, 81st Cong., 1st 
sess. 
H. Dec. 272, 84th Cong., 2d 
sess. 
S. Doc. 103, 80th Cong., 2d 
sess. 2 
PL 90-17

TABLE 35-C 
SACRAMENTO, CALIF., DISTRICT 
SACRAMENTO RIVER, CALIF.: 
TIDAL AND FLOOD CONDITIONS PREVAILING 
(See Section 2 of Text) 
Miles from Range in Feet 
Mouth of Mean Extreme Ordinary Extreme 
Place River Tidal' Tidal2 Flood 3 Flood4 
Collinsville 0 4.3 7 8 10 
Sacramento 59 2.02 3 20 28 
Verona (Mouth of Feather River) 80 - Trace 22 30 
Colusa 144 - - 26 32 
Chico Landing 193 - - 20 25 
Red Bluff 248 - - 24 30 
1. Mean lower low water to mean higher high water. 3. Mean lower low water to flood stage. 
2. Tide at low water season only. 4. Extreme low water to indicated flood condition. 
TABLE 35-D SACRAMENTO RIVER, CALIF.: 
MAJOR ITEMS OF WORK INCLUDED IN MAINTENANCE 
(See Section 2 of Text) 
Fiscal Year 
Item Costs 
Shallow Draft Channel: 
Clamshell dredging Sacramento River, intermittent 
locations Sacramento to Colusa, hired labor 
and rented equipment $ 73,878 
Dredging Sacramento River, Sacramento Harbor to 
Six Mile Bar by contract suction dredge 328,713 
Removed snags, Sacramento River, Junction Point to 
Colusa by hired labor and rented equipment 72,175 
Condition and operation studies by hired labor 32,241 
Deep Water Ship Channel: 
Maintenance and operation locks and gates, hired 
labor 88,506 
Maintenance and operation service facilities, 
hired labor 43,672 
Intermittent stone protection, vicinity mile 16.0 
to mile 23.6 by contract 133,282 
Condition and operation studiesoby hired labor 52,633 
TABLE 35-E SAN JOAQUIN RIVER, CALIF.: 
TOTAL COST OF NEW WORK FOR PROJECT1 
(See Section 4 of Text) 
Federal Non-Federal 2 
Corps of Coast Required Lands and 
Engineers Guard Cash Damages (includ- Total 
Modification (Construction) (Construction) Contribution ing Relocations) Total Project 
Prior to 1950 Modification $4,009,938 $80,000 $1,307,500 $1,042,000 $2,349,500 $6,439,438 
1950 Modification 1,823,179 - 35,000 135,000 170,000 1,993,179 
Total 5,833,117 80,000 1,342,500 1,177,000 2,519,500 8,432,617 
1. Completed in May 1960. 
2. Excludes $5,865,000 (Feb. 1954) local interests costs for 
Stockton Deep Water Channel terminal facilities required under 
terms of project authorization. 
1079

TABLE 35-F 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
SAN JOAQUIN RIVER, CALIF.: 
PROJECT UNITS (1950 MODIFICATION) RECLASSIFIED AND EXCLUDED 
FROM PROJECT COST 
(See Section 4 of Text) 
Non-Federal 
Federal Required Lands and 
Corps of Cash Damages (including Total 
Unit Engineers Contribution Relocations) Total Project 
Settling Basin above head of Burns 
Cutoff' $1,073,000 $ 30,000 $ 200,000 $ 230,000 $1,303,000 
Burns Cutoff improvement; 
new turning basin; dredging 
Mormon Channel2 7,882,000 431,000 1,455,000 1,886,000 9,768,000 
Upper Stockton Channel enlargement4 535,000 34,000 15,000 49,000 584,000 
1. Inactive;July 1959 price index. 4. Deleted by 1965 River and Harbor Act authorization of 
2. Deferred;July 1960 price index. San Francisco Bay to Stockton Channel, Sacramento District, 
3. For lands and construction. Improvement No. 3. 
TABLE 35-G OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 8 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Feather River, Calif.1 1951 $ - $ 5,7522 
Middle River and Connecting Channels, 
Calif.3 ,4 ,8 1967 8,354 52,312 
Mokelumne River, Calif.3, 8 1967 8,500 135,532 
Navajo Reservoir, New Mex. 3 , 5 ,6 2,132 
Suisun Point Channel, Calif.3,7 1965 191,728 
1. Maintenance project, channels adequate for commerce. 6. All costs transferred from Los Angeles District in fiscal 
2. Includes $10 for maintenance for previous project. year 1968. 
Excludes $6,160 for previous project and $3,840 for existing 7. Authorized by Chief of Engineers, under authority of sec. 
project for maintenance expended from contributed funds. 107, Public Law 86-645, as amended. Estimated cost (July 
3. Completed. 1964) to local interests was $12,000 for lands, damages, and 
4. Includes $1,600 for new work and $790 for maintenance spoil retention dikes. 
for previous project. 8. Minor operation costs for FY 1970: Middle River $3,599; 
5. Authorized by Chief of Engineers under authority of sec. and Mokelumne River $3,882. 
107, Public Law 86-645, as amended. 
TABLE 35-H MERCED COUNTY STREAM GROUP, CALIF.: 
MAXIMUM INFLOW, STORAGE, AND OUTFLOW FOR PROJECTS 
(See Section 21 of Text) 
Maximum 
Inflow Maximum Maximum 
(c.f.s.) Storage Outflow 
Stream (daily) (acre-feet) (c.f.s.) 
Burns 1,044 600 1,373 
Bear 1,794 1,900 1,440 
Owens 335 500 118 
Mariposa 2,548 4,200 830 
1080

SACRAMENTO, CALIF., DISTRICT 
TABLE 35-I SACRAMENTO RIVER AND TRIBUTARIES, CALIF., 
COLLINSVILLE TO SHASTA DAM: 
PROJECT UNITS RECLASSIFIED AND EXCLUDED FROM COST ESTIMATE 
(See Section 28 of Text) 
Estimated Cost 
Current 
Unit Classification Federal Non-Federal1 Total 
1944 Modification: 
Antelope Creek 2 Inactive $1,400,000 $ 340,000 $1,740,000 
Lower Butte Basin3 Deferred 7,286,000 2,285,000 9,571,000 
Thomes Creek 2 Deferred 1,140,000 140,000 1,280,000 
Willow Creek 2 Inactive 1,290,000 120,000 1,410,000 
Bypass Levees4 Deferred 7,100,000 940,000 8,040,000 
Bypass Levees4 Inactive 3,010,000 - 3,010,000 
1950 Modification: 
Upper Butte Basin2 Deferred 3,530,000 1,787,000 5,317,000 
1. For lands and damages, including relocations. 
2. July 1960 price level. 
3. Excludes work applicable to extension of Moulton Weir 
(July 1954 price level). 
4. July 1961 price level. 
TABLE 35-J SACRAMENTO RIVER AND TRIBUTARIES, CALIF., 
FROM COLLINSVILLE TO SHASTA DAM: 
CONSTRUCTION ACCOMPLISHED AND CONTRACT COSTS 
(See Section 28 of Text) 
Required 
Contract Federal Contributed Total 
Contract No. 13 (selected sites: Sacramento 
River, miles 62.0-148.0, and Elder Creek) $ 51,559 $ 16,564 $ 68,123 
Contract No. 15 continuation (Bank protection, 
right and left banks, Sacramento River and 
Georgianna Slough) 708,177 123,031 831,208 
Miscellaneous minor contract and hired labor 
in connection with levee construction 61,218 - 61,218 
Contract No. 16 initiation (Bank protection, 
right and left banks, selected sites, 
Sacramento River between Tisdale weir 
and Sacramento) 936,033 84,478 1,020,511 
Contract No. 17 initiation (Bank protection, 
right and left banks, selected sites, 
Sacramento River between Colusa and 
Boyers Bend) 190,556 6,328 196,884 
Contract No. 18 initiation (Bank protection, 
selected sites, Bear and Feather Rivers 
and Elder and South Dry Creeks) 31,730 78 31,808 
1081

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 35-K 
NEW WORK: 
WALNUT CREEK, CALIF.: 
MAJOR WORK ACCOMPLISHED AND FISCAL YEAR COSTS 
(See Section 29 of Text) 
Required Contributed 
Contributed Funds 
Item Federal Funds Other Total 
Engineering and design, hired labor $ 116,504 $ 9,311 $ 3,174 $ 128,989 
Channel improvement, Treat 
Boulevard (Geary Road) to 
School Foot Bridge completed 
by continuing contract 1,047,262 83,690 51,531 1,182,483 
Channel improvement, School 
Foot Bridge to S.P.RR. Bridge 
initiated by continuing 
contract 235,246 18,799 29 254,074 
Levees, Stage 3 construction, 
Waterfront Road to Grayson 
Creek, initiated and completed 
by contract 69,459 5,551 75,010 
Miscellaneous minor construction, 
contract and hired labor 87,602 7,020 2,713 97,335 
TABLE 35-M SURVEYS 
(See Section 36 of Text) 
Fiscal Year costs were as follows: 
Navigation studies $ 16,027 
Flood control studies 687,126 
Collaboration with Soil Conservation Service 1,129 
Collaboration with Bureau of Reclamation under 
Small Reclamation Projects (PL 984) 473 
Coordination with Bureau of Reclamation pertaining 
to projects under regular reclamation program 12,734 
Coordination with other agencies on Truckee, 
Carson, and Walker River Basins 8,946 
California Region Comprehensive Basin Study 33,8011 
Great Basin Region Comprehensive Basin Study 8,7331 
Upper Colorado Region Comprehensive Basin Study 7,4171 
Total $776,386 
1. Excludes the following expenditures for framework studies which were authorized by Federal reimbursable order: California Basin 
($233,650); Great Basin ($120,080); and Upper Colorado Basin ($37,840). 
1082

SACRAMENTO, CALIF., DISTRICT 
TABLE 35-L OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 32 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
American River, Calif.1 1959 $ 2,125,8182 $ 
Aquatic Plant Control, Calif.1 1967 1,000 
Big Dry Creek Reservoir and diversion, 
Calif.1 1955 1,369,9314 
Big Wash, Milford, Beaver County, 
Utah ,3 
1961 217,8795 
Burch Creek, Weber County, Utah3 1964 26,049 
Duck Creek, San Joaquin County, Calif. 1,3 1967 664,8256 
Folsom Reservoir, American River, Calif.7 1957 63,014,810 
Gleason Creek, Nev. 1963 3,810 
Green Valley Creek, Solano County, Calif.1 ,3 1963 136,0268 
Humboldt River and tributaries, Nev.9 1951 57,062 
Little Valley Wash, Magna, Utah t � 1951 
Middle Creek, Calif.11 1 1967 2,643,499 - 
Reese River, Battle Mountain, Nevada1,3 1969 133,33912 
Salt Lake City, Jordan River, Utah1 1961 1,227,57013 
Sevier River near Redmond, Utah1 1952 919,00014 
Spanish Fork River, Utah1 s 1955 20,000 
Truckee River and tributaries, Calif. 
and Nev. 1968 1,038,960 
Weber River and tributaries, Utah1 6 1963 54,432 
1. Completed. 
2. Excludes $54,919 other contributed funds for miscellaneous 
construction for local interests pursuant to requirements 
of local cooperation. Total costs for all requirements of local 
cooperation were $951,000 (1959), for lands and relocations. 
3. Authorized by Chief of Engineers under authority of sec. 
205, Public Law 80-858, as amended. 
4. Excludes $44,008 other contributed funds for miscellaneous 
construction in connection with bridge construction 
pursuant to requirements of local cooperation. Total cost to 
local interests for all requirements of local cooperation was 
$370,000 (1959) for lands and relocations. 
5. Excludes $22,000 for preauthorization studies. 
6. Excludes $50,000 for preauthorization studies. Estimated 
costs to local interests were $665,000 for lands and damages 
including relocations. 
7. Completed except for minor real estate costs. Transferred 
to Bureau of Reclamation in May 1956 for operation and 
maintenance by that agency in conjunction with other units of 
Central Valley project. 
8. Excludes $20,000 for preauthorization studies. 
9. Restudy ($54,947) resulted in reclassification to active on 
February 10, 1964. 
10. Inactive status. 
11. $365, minor engineering costs for FY 1970. Estimated 
costs (FY 1967) to local interests for all requirements of local 
cooperation were $1,340,000 for lands and damages including 
relocations. 
12. $483, minor engineering and hired labor costs for 
FY 1970. Includes $19,000 for preauthorization studies. 
13. Estimated costs to local interests for all requirements of 
local cooperation were $463,000 (July 1962) for lands and 
damages including relocations. 
14. Excludes $48,000 required contributed funds toward first 
cost. Costs to local interests for all requirements of local 
cooperation, including required contributions, were $118,000 
(1951). 
15. Deferred status. 
16. 1968 Flood Control Act extended authorization from 
April 1967 to April 1972. 
1083

TABLE 35-N 
REPORT OF TH 
COM
[E CHIEF OF ENGINEERS, U.S. ARMY 1970 
IPLETED FLOOD PLAIN STUDIES 
(See Section 37 of Text) 
Requesting 
Agency Date Complete 
Sacramento County 
Location 
Sacramento County, Calif., Streams: 
American River between Folsom Dam and 
Sacramento River 
Arcade Creek between North Sacramento 
and Citrus Heights 
Chicken Ranch and Strong Sloughs, north 
of American River and east of North 
Sacramento 
Dry Creek between Roseville and Rio Linda 
Morrison Creek Basin (Tributary to 
Snodgrass Slough Channels-Southeast of 
Sacramento near towns of Elk Grove and 
Florin) 
Snodgrass Slough Area east of Sacramento 
River, between Sacramento and Mokelumne 
River including Stone and Beach Lakes 
West Side San Joaquin Valley, Calif: State 
of California, primary purpose to develop 
hydrologic and other data with particular 
regard to streams along California Aqueduct 
Kaweah River above Terminus Reservoir, 
vicinity Three Rivers, Calif. 
Tule River above Success Reservoir, 
Springville, Calif. 
Kern River, vicinity of Kernville, 
Calif. 
Marysville to mouth of Feather 
River, Calif. 
Kern River, vicinity of Bakersfield, Calif. 
Trout and Bijou Creeks, South Lake 
Tahoe, Calif. 
Upper Truckee River, South Lake Tahoe, 
Calif. 
American Fork River and Dry Creek 
(Upper Jordan River Basin), Utah 
Barton, Mill, and Stone Creeks, Utah 
Jordan River Complex (Lower Jordan 
River Basin), Utah 
1. State costs were $37,756. 
d 
Apr 1963 
Oct 1965 
Oct 1965 
Oct 1965 
Sept 1963 
Aug 1963 
July 19651 
Oct 1967 
Aug 1968 
June 1968 
July 1968 
Nov 1969 
Sept 1969 
Oct 1969 
Nov 1969 
Dec 1969 
Nov 1969 
1084 
Federal 
Cost 
$ 5,213 
9,935 
12,462 
9,222 
15,181 
9,987 
1,943 
33,500 
33,400 
25,062 
19,813 
28,009 
15,000 
25,000 
34,100 
18,600 
55,097 
Tulare County 
Tulare County 
Kern County 
Reclamation Board 
Kern County 
El Dorado County 
El Dorado County 
State of Utah 
State of Utah 
State of Utah

HONOLULU, HAWAII, DISTRICT * 
This district comprises the State of Hawaii and the 
Marshall Islands. The district also performs such 
actions pertaining to preservation and protection of 
navigable waters on and about the island of Guam as 
provided for under River and Harbor Act of 1899. In 
addition, the district will supervise and prosecute Civil 
Works construction as directed by the Division 
Engineer, Pacific Ocean Division. 
IMPROVEMENTS 
Navigation Page 
1. Barbers Point Harbor, Oahu, Hawaii .. 1085 
2. Honokohau Small Boat Harbor, 
Hawaii, Hawaii .................................. 1086 
3. Honolulu Harbor, Oahu, Hawaii .......... 1086 
4. Kahului Harbor, Maui, Hawaii ............ 1086 
5. Kawaihae Harbor, Hawaii, Hawaii ...... 1087 
6. Lahaina Small Boat Harbor, Maui, 
H aw aii .................................................... 1087 
7. Maunalua Bay Small Boat Harbor, 
Oahu, Hawaii .................................. 1087 
8. Reconnaissance and Condition Surveys 1088 
9. Other Authorized Navigation Projects .. 1088 
10. Navigation Work Under Special 
Authorization ..................................... 1088 
Beach Erosion Control 
11. Waikiki Beach, Oahu, Hawaii ............... 1088 
12. 
13. 
14. 
15. 
16. 
17. 
18. 
19. 
Beach Erosion Control (cont.) 
Other Authorized Beach Erosion 
Control Projects ............................... 1088 
Beach Erosion Control Work Under 
Special Authorization ........................ 1088 
Flood Control 
Kuliouou Stream, Oahu, Hawaii .. 1088 
Inspection of Completed Flood Control 
Projects ........................................... 1089 
Other Authorized Flood Control 
Projects .......................................... 1089 
Flood Control Work Under Special 
Authorization ........................................ 1089 
General Investigations 
Surveys .............................................. 1089 
Collection and Study of Basic Data ..... 1089 
NAVIGATION 
1. BARBERS POINT HARBOR, OAHU, 
HAWAII 
Location. On the west coast of Oahu, about 25 miles 
from metropolitan Honolulu. (See Coast and Geodetic 
Charts Nos. 4110 and 4133.) 
Existing project. See table 36-B for authorizing 
legislation. Deep-draft harbor provides for an entrance 
channel 3,700 feet long, 450 feet wide and 42 feet deep; 
a harbor basin of about 110 acres and 38 feet deep; and 
wave absorbers totaling 6,000 feet long. Light-draft 
harbor provides for a main access channel 1,200 feet 
long, 80 - 140 feet wide, and 12 feet deep; and wave 
absorber 300 feet long. Light-draft harbor with a 
berthing capacity of 292 boats will be located northwest 
of the proposed deep-draft basin. Approved 
project cost estimate (July 1970) for deep-draft harbor 
is $22,010,000, of which $18,080,000 (excluding Coast 
Guard cost) is Federal cost, and $3,860,000 is non- 
Federal cost, including lands and rights-of-way and 
cash contribution. Plane of reference is mean lower low 
water datum. Tidal range between mean lower low 
water and higher high water is 1.9 feet, extreme range 
under normal conditions is 2.3 feet. 
Local cooperation. Local interests must provide lands 
and rights-of-way for construction and future maintenance; 
provide and maintain mooring facilities and 
utilities open to all on equal terms; provide such utility 
and drainage relocations or alterations as necessary; 
hold the United States free from damages; and provide 
a cash contribution, estimated to be $1,710,000 for 
deep-draft harbor. 
Terminal facilities. Existing privately owned barge 
harbor consists of a concrete marginal wharf, 250 feet 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
1085 
451-584 0-72-69

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
long along south side of the barge basin. An offshore 
tanker facility is connected to the oil refinery by 
pipelines. 
Operations and results during fiscal year. General design 
memorandum for deep-draft harbor is approximately 
98 percent complete. A model study was completed by 
the University of Hawaii under contract and the report 
was published in April 1970. Preconstruction planning 
on light-draft harbor has been deferred as requested by 
the State of Hawaii. 
Condition at end of fiscal year. Preconstruction planning 
for deep-draft harbor is 78 percent complete. 
2. HONOKOHAU SMALL BOAT 
HARBOR, HAWAII, HAWAII 
Location. On the west coast of island of Hawaii, 150 
nautical miles from Honolulu. (See Coast and Geodetic 
Survey Chart No. 4140.) 
Existing project. See table 36-B for authorizing 
legislation. Project provides for an inshore harbor basin 
with an entrance and access channel 840 feet long, 120 
feet wide, 20 feet deep at outer end and 15 feet deep at 
inner end; a main access channel 660 feet long, 120 feet 
wide, 15 feet deep in outer end and 12 feet deep in the 
inner end; two rubble wave absorbers; one 650 feet 
long along the north side of the entrance channel and 
one 150 feet long along the south side of the channel; 
and a wave trap. The harbor will accommodate 
approximately 420 boats. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Total construction 
contract was $1,983,326. Construction of the 
project was essentially completed in March 1970, and 
the planting work was completed in June 1970. A 
condition survey was completed in March 1970. 
Condition at end of fiscal year. Project was completed in 
June 1970. Controlling depth (March 1970) at mean 
lower low water datum was 16.7 feet in entrance 
channel, 10.9 feet in inner access channel and 14.3 feet 
in outer access channel. 
3. HONOLULU HARBOR, OAHU, 
HAWAII 
Location. On the southern coast of island of Oahu, 
Hawaii, in city of Honolulu. (See Coast and Geodetic 
Survey Chart No. 4109.) 
Existing project. Completed portion of project comprises 
three channels 35-40 feet deep, two harbor basins 
35 feet deep, and a double-leaf bascule bridge. Last full 
report on this project is on pages 1828 and 1829 of 
Annual Report for 1962. Uncompleted portion provides 
deepening seaward 3,600 feet of Fort Armstrong 
entrance channel to 45 feet, and removing a narrow 
strip from northeast corner of Sand Island; deepening 
main harbor basin and Kapalama Channel to 40 feet; 
widening Kapalama Channel by 60 feet along Sand 
Island side for 3,100 feet; and relocation of project line 
to provide a 100-foot offset from pier heads in 
Kapalama Channel and at piers 9, 10, and 11 and an 
offset of 50 to 75 feet elsewhere in the harbor. Approved 
project cost estimate (1970) for new work is $6,160,000, 
of which $3,040,000 (excluding Coast Guard cost) is 
Federal cost and $3,040,000 is non-Federal cost, 
including lands, relocations and cash contribution. See 
table 36-B for authorizing legislation. 
Local cooperation. Fully complied with on existing 
project. State of Hawaii assures fulfilling their requirements 
of furnishing lands and rights-of-way for 
construction and future maintenance and hold the 
United States free from damages. Non-Federal cash 
contribution is $90,000. 
Terminal facilities. There are 34 piers and 2 marginal 
wharves, which include 3 piers and 1 marginal wharf 
owned by the Federal Government; 13 piers and 1 
marginal wharf owned by the State of Hawaii; and 18 
piers privately owned. All non-Federal piers are open 
to all on an equal basis, although certain ones are 
reserved for passenger terminals, for container ships or 
for handling specific bulk commodities such as petroleum 
products, pineapple, sugar, animal feed, and 
cement. 
Operations and results during fiscal year. New work: 
General design memorandum is about 83 percent 
complete. A condition survey was completed in June 
1970. 
Condition at end of fiscal year. Existing project was 
completed in Fiscal Year 1962. Preconstruction planning 
on modification is 66 percent complete. Controlling 
depth (June 1970) at mean lower low water 
datum was 35.0 feet in entrance channel, 36.2 feet in 
Kalihi Channel, 35.7 feet in harbor basin, 34.4 feet in 
reserve channel, 35.6 feet Kapalama Basin, and 23.6 
feet east side Pier 39. 
4. KAHULUI HARBOR, MAUI, HAWAII 
Location. On northern coast of island of Maui, at town 
of Kahului. (See Coast and Geodetic Survey Chart 
4124.) 
Existing project. Rubblemound breakwaters on east 
and west sides of harbor, about 2,850 and 2,396 feet 
long, respectively, and an entrance 600 feet wide 
between breakwaters and a harbor basin 2,050 feet 
wide, 2,400 feet long, and 35 feet deep. Range of tide 
between mean lower low water and mean higher high 
water is 2.2 feet and extreme tidal range under normal 
conditions is 4.5 feet. See table 36-B for authorizing 
legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. Two wharves owned and operated 
by State of Hawaii which are open to shipping on equal 
terms. Pipelines for fuel oil, distillate, kerosene, 
gasoline, molasses, and water are available. There is 
also a bulk-sugar plant of 30,000-ton storage capacity 
with a conveyor loading system capable of conveying at 
a rate of about 750 tons per hour. Facilities are 
considered adequate for existing commerce. 
1086

HONOLULU, HAWAII, DISTRICT 
Operations and results during fiscal year. Regular funds: A 
contract was awarded for the repair of breakwater in 
September 1968. Construction contract was completed 
in July 1969, in amount of $387,060. Maintenance: A 
condition survey was conducted in September 1969. 
Condition at end of fiscal year. Rehabilitation of 
breakwater was completed in July 1969. Controlling 
depth (September 1969) at mean lower low water 
datum was 33.2 feet in the harbor basin. 
5. KAWAIHAE HARBOR, HAWAII, 
HAWAII 
Location. On northwestern coast of island of Hawaii, 
in town of Kawaihae. (See Coast and Geodetic Survey 
Chart 4167.) 
Existing project. Completed portion comprises of an 
entrance channel 400 feet wide, 2,900 feet long and 40 
feet deep; a harbor basin 1,250 feet square and 35 feet 
deep; a rubblemound breakwater with maximum crest 
elevation 13 feet above mean lower low water and 2, 
650 feet long, and 3,335 feet of fill protected with heavy 
stone revetment. Plane of reference is mean lower low 
water. Uncompleted portion provides for widening 
entrance channel to 500 feet at outer end, tapering to 
existing 520 feet width at inner end; enlarging harbor 
basin to maximum 200-foot width and 500-foot length; 
extending existing breakwater by 750 feet; and 
constructing a small-boat harbor. Range of tide 
between mean lower low water and mean higher high 
water is 2.1 feet, and extreme range under ordinary 
conditions is 4.5 feet. See table 36-B for authorizing 
legislation. Approved project cost (July 1970) for deep 
draft harbor is $2,150,000, of which $2,087,000 
(excluding Coast Guard cost) is Federal cost and $25, 
000 is non-Federal cost for relocation and cash 
contribution. 
Local cooperation. Completed portion fully complied 
with. For modifications, the local interests will provide 
a cash contribution, suitable terminal facilities, furnish 
lands and rights-of-way for construction and future 
maintenance, and hold the United States free from 
damages. Non-Federal cash contribution is $25,000. 
Terminal facilities. A 605-foot concrete wharf and 12, 
000 square foot pier shed accommodates transpacific 
commerce; and a 410-foot long 40-foot wide apron and 
3,600 -square foot pier shed accommodates interisland 
tugs and barges including livestock. Other facilities also 
open to all on equal basis and considered adequate for 
existing commerce, include a 20,000 ton capacity bulk 
sugar storage building, 10,000 ton molasses storage 
tank, petroleum tanks of 1.2 million gallon capacity 
and aqua ammonia tanks of $/4 million gallon 
capacity. 
Operations and results during fiscal year. New work: 
General design memorandum is 100 percent complete 
and work on plans and specifications initiated for the 
deep draft harbor. Maintenance: A condition survey 
was conducted in October 1969. 
Condition at end of fiscal year. Existing project was 
completed in July 1962. Preconstruction planning for 
the deep draft harbor is approximately 80 percent 
complete and the light draft harbor is approximately 
10 percent complete. A new General Design Memorandum 
will be prepared for the light draft harbor 
relocated site. Controlling depth (October 1969) at 
mean lower low water datum in the harbor basin is 34.1 
feet and 37.3 feet in the channel. 
6. LAHAINA SMALL BOAT HARBOR, 
MAUI, HAWAII 
Location. On west coast of Maui, approximately 22 
road miles from Wailuku, the Maui county seat. (See 
Coast and Geodetic Survey Chart No. 4130.) 
Existing project. Project provides for a mole 620 feet 
long; breakwater 950 feet long; a basin 3 acres; 
entrance channel 515 feet long, 150 feet wide, 12-20 
feet deep; and a wave absorber 180 feet long. Harbor is 
designed to accommodate 160 boats. See table 36-B for 
authorizing legislation. Approved project cost estimate 
(July 1970) is $2,330,000, of which $1,190,000 
(excluding Coast Guard cost) is Federal cost, and $1, 
120,000 is non-Federal cost, including lands and rightsof-
way and cash contribution. Plane of reference is 
mean lower low water datum. Tidal range between 
mean lower low water and mean higher high water is 
2.2 feet, extreme range under normal conditions is 4.0 
feet. 
Local cooperation. Local interests must provide lands 
and rights-of-way for construction and future maintenance, 
provide and maintain mooring facilities and 
utilities open to all on equal terms; provide such utility 
and drainage relocations or alterations necessary; hold 
the United States free from damages; and provide a 
cash contribution, estimated to be $1,050,000. 
Operations and results during fiscal year. General design 
memorandum is approximately 25 percent complete. 
Condition at end of fiscal year. Preconstruction planning 
is 20 percent complete. State of Hawaii (local cooperation) 
requested shifting the harbor site about 1, 
000 feet northwest of the site shown in the authorizing 
document. 
7. MAUNALUA BAY SMALL BOAT 
HARBOR, OAHU, HAWAII 
Location. On southeastern tip of island of Oahu, 
approximately 11 miles from Honolulu. (See Coast and 
Geodetic Survey Chart No. 4131.) 
Existing project. Project provides for an east revetted 
mole 2,900 feet long; a west revetted mole 1,950 feet 
long; an entrance channel 870 feet long, 200 feet wide, 
and 15 feet to 20 feet deep; and a widened channel 
section of 370,000 square feet, and 15 feet deep. Plane 
of reference is mean lower low water datum. Range of 
tide between mean lower low water and mean higher 
high water is 1.9 feet, and extreme tidal range under 
normal conditions is 4.0 feet. Harbor will accommodate 
about 950 small craft in approximately 44 
acres. See table 36-B for authorizing legislation. 
Approved project cost estimate (July 1970) is $1,730, 
1087

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
000 of which $756,000 (excluding Coast Guard cost) is 
Federal cost and $954,000 is non-Federal cost for lands 
and cash contribution. 
Local cooperation. Local interests must provide lands 
and rights-of-way for construction and future maintenance, 
provide and maintain mooring facilities and 
utilities open to all on equal terms; provide such utility 
and drainage relocations or alterations as necessary; 
hold the United States free from damages; and provide 
a cash contribution, estimated to be $754,000. 
Operations and results during fiscal year. General design 
memorandum is approximately 58 percent complete. 
Condition at end of fiscal year. Preconstruction planning 
is 47 percent complete. 
8. RECONNAISSANCE AND CONDITION 
SURVEYS 
Condition surveys conducted at Haleiwa Harbor, 
Oahu in December 1969 and Hilo Harbor, Hawaii in 
November 1969. 
9. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 36-C. 
10. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation Activities Pursuant to Section 107, Public Law 
86-645 (Preauthorization) 
Kewalo Small Boat Harbor, Oahu, Hawaii: Plans 
and specifications are 90 percent complete. Cost for 
fiscal year was $3,472. Nawiliwili Small Boat Harbor, 
Kauai, Hawaii: Project was authorized in May 1964. 
No funds are available for plans and specifications. 
BEACH EROSION CONTROL 
11. WAIKIKI BEACH, OAHU, HAWAII 
Location. Waikiki Beach is along the eastern end of 
Malama Bay on the south coast of the island of Oahu. 
(See Coast and Geodetic Chart No. 4132.) 
Existing project. For last full report on the existing 
project, see 1965 report. Project provides for restoration 
and protection of the shore of Waikiki Beach from 
Duke Kahanamoku Beach to the Elks Club. The plan 
consists of artificial placement of beach fill on the shore 
to widths of 75 to 180 feet; construction of approximately 
eight new groins and appurtenant drainage 
facilities; modification of three existing groins, and 
construction of four additional groins if needed. See 
table 36-B for authorizing legislation. Approved 
project cost estimate (July 1970) is $4,290,000 of which 
$2,430,000 is Federal cost and $1,860,000 is non- 
Federal cost in cash contribution. 
Local cooperation. Local interests must obtain approval 
by the Chief of Engineers, prior to commencement of 
work, of detailed plans and specifications for the Kuhio 
segment; provide lands and rights-of-way for construction 
and future maintenance; maintain continued 
public ownership or continued availability for unobstructed 
public use of the shores upon which the 
amount of Federal participation is based and administration 
of those shores for public use, exclusively 
for bathing and water-related recreation; maintain the 
project works as may be required to serve their 
intended purpose, except for the beach fill on the Fort 
DeRussy frontage; and control water pollution to the 
extent necessary to safeguard the health of bathers; 
hold the United States free from damages; and provide 
a cash contribution estimated to be $1,860,000. 
Terminal facilities. None. 
Operations and results during fiscalyear. Advance funds of 
$82,000 was accepted from the State of Hawaii (local 
cooperative agency) for preconstruction planning. 
Preconstruction planning is approximately 55 percent 
complete. 
Condition at end of fiscal year. The State of Hawaii has 
completed the plans and specifications for the Kuhio 
Beach segment, presently estimated at $1,000,000. 
Construction of Fort DeRussy Beach segment was 
initiated in October 1969 utilizing military non-appropriated 
funds. Construction completion is scheduled 
in September 1970. 
12. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECTS. 
See table 36-D. 
13. BEACH EROSION CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
Beach erosion control activities pursuant to Section 103, Public 
Law 87-874 (preauthorization) 
Kaimu Black Sand Beach, Hawaii, Hawaii. Work 
on Detailed Project Report continued and cost for this 
fiscal year was $8,004. Kihei Beach, Maui, Hawaii. 
Plans and specifications were initiated. Project planning 
is 90 percent complete. Estimated project cost is 
$474,000. Cost for fiscal year was $12,958., Preauthorization 
studies initiated on Kaaawa Beach, Oahu, 
$10,606; Hanauma Bay Beach, Oahu, $4,880; Hauula 
Beach, Oahu, $4,475; and Punaluu Beach, Oahu, $6, 
327. Unfavorable reconnaissance studies were completed 
on Pokai Bay, Oahu, at $2,500 and on Kahala 
Beach, Oahu, at $1,800. 
FLOOD CONTROL 
14. KULIOUOU STREAM, OAHU, HAWAII 
Location. Kuliouou Valley is on southeastern corner 
of island of Oahu, about 10 miles southeast of Honolulu 
on leeward side of Koolau Mountains. 
Existing project. Provides for dredging a 300-foot long 
channel into Maunalua Bay; constructing a reinforced 
concrete rectangular channel, utilizing and improving 
existing cement rubble masonry walls, where ap- 
1088

HONOLULU, HAWAII, DISTRICT 
plicable, for about 1,300 feet; providing reinforced 
concrete floodwalls on west bank of existing lined 
trapezoidal channel; and adding a rectangular ditch 
and reinforced concrete box culvert to accommodate 
interior drainage flows from mouth of existing lateral 
ditch. Project first cost is $1,540,335 of which $1 million 
is Federal cost and $540,335 is non-Federal cost. 
Project authority is Section 205, 1948 Flood Control 
Act, as amended. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. A construction 
contract was awarded in September 1968 and completed 
in February 1970 in amount of $1,669,471 
which includes State work, Contributed Funds, Other, 
in the amount of $294,730. 
Condition at end of fiscal year. Project was completed in 
February 1970, at a total cost of $1,886,711. 
15. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Section 3, Flood Control Act of June 22, 1936, as 
amended and supplemented, included requirement 
that local interests maintain and operate completed 
flood control works in accordance with regulations 
prescribed by the Secretary of War. Inspections were 
conducted during October and November 1969 at 
Hanapepe River Flood Protection Works, Kauai; lao 
Stream Snagging and Clearing Project, Maui; Kaunakakai 
Stream Flood Protection Works, Molokai; 
Kawainui Swamp Flood Protection Works, Oahu; and 
Wailoa Stream Flood Protection Project, Hawaii; at a 
cost of $3,252. 
16. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 36-E. 
17. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 205, Public Law 
858, 80th Congress, as amended (preauthorization) 
Preauthorization studies continued on Aiea Stream, 
Oahu, $3,753; Wailua River, Kauai, $26,233; Wailupe 
Stream, Oahu, $7,564; and Waimalu Stream, 
Oahu, $1,490. Preauthorization studies were initiated 
on Waialae-Iki Stream, Oahu, $27,528; and Waimano 
Stream, Oahu, $46,342. 
Emergency flood control activities - repair, flood fighting, and 
rescue work (Public Law 99, 84th Congress, and antecedent 
legislation). 
Federal cost for fiscal year was $31,111 of which $8, 
615 was for advance preparation, $5,403 for flood 
emergency operations and $17,093 for rehabilitation. 
GENERAL INVESTIGATIONS 
18. SURVEYS 
Survey cost for fiscal year was $194,248 of which $77, 
769 was for navigation, $105,989 for flood control and 
$10,490 for special studies. 
19. COLLECTION AND STUDY OF BASIC 
DATA 
Flood plain reports on Anahola, Kauai and Kihei 
Area, Maui were published. Work continued on the 
flood plain studies at Kaaawa, Oahu, and Waialua- 
Haleiwa, Oahu. Fiscal year costs for flood plain 
management services totaled $132,420 of which $52, 
677 was for flood plain information studies, $49,850 
was for technical services, $36 was for comprehensive 
flood damage prevention plan, and $29,857 was for 
flood plain management. See table 36-F for Completed 
Flood Plain Studies. 
1089

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
1. Barbers Point 
Harbor, Oahu, HI 
(Federal Funds) 
2. Honokohau Small 
Boat Harbor, 
Hawaii, HI 
(Federal Funds) 
(Contributed Funds) 
3. Honolulu Harbor, 
Oahu, HI 
(Federal Funds) 
4. Kahului Harbor, 
Maui, HI 
(Federal Funds) 
(Contributed Funds) 
5. Kawaihae Harbor, 
Hawaii, HI 
(Federal Funds) 
6. Lahaina Small Boat 
Harbor, Maui, HI 
(Federal Funds) 
7. Maunalua Bay 
Small Boat Harbor, 
Oahu, HI 
(Federal Funds) 
11. Waikiki Beach, 
Oahu, HI 
(Federal Funds) 
(Contributed Funds) 
14. Kuliouou Stream, 
Oahu, HI 
(Federal Funds) 
(Contributed Funds) 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Adv Funds 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
$100,000 $168,000 $ - $ - 
12,140 106,925 116,159 20,297 
33,000 200,000 
27,119 17,592 
11,445 
-6,040 
-58 
5,900 
4,925 
-34,900 
127,802 
20,703 
97,400 
97,400 
5,700 
10,017 
457,000 
15,445 
515,000 
537,606 
453,696 
441,083 
15,727 
30,000 
4,288 
399,639 
58 10,125 
84,000 
94,687 
32,000 
4,397 
13,115 
34,000 
11,627 
20,856 
386 
11,068 
5,909 
56,000 
19,446 
858,900 
31,197 16,020 891,783 
466,000 
73,000 
198,719 
177,774 
189,485 
4,956 
-11,572 
42,911 
750,0002 
461 
21,858 
8,415 
500,0002 
26,000 
36,497 
4,694 
137,000 -15,000 
95,000 445,335 
$ 268,000 
255,521 
821,000 
781,036 
631,470 
630,568 
8,553,252 
8,544,079 
1,077,771 
1,077,771 
2,388,693 
2,388,693 
2,110,528 
2,104,868 
30,200 
30,200 
5,617,384 
4,859,117 
34,386 
32,926 
32,000 
30,349 
500,000 
82,000 
55,943 
1,000,000 
1,000,000 
588,000 
540,335 
1. Required contributed funds ($646,000) provided under 
escrow agreement dated June 7, 1968, in the total sum of 
$1,164,200. 
2. This amount placed in budgetary reserve to be allocated 
in FY71. 
1090 
TABLE 36-A

HONOLULU, HAWAII, DISTRICT 
TABLE 36-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 27, 1965 
Oct. 27, 1965 
Mar. 3, 1905 
Aug. 8, 1917 
July 3, 1930 
Aug. 30, 1935; 
included in Public 
Works Administration 
program 
Sept. 6, 1933 
July 24, 1946 
Sep. 3, 1954 
Oct. 27, 1965 
June 25, 1910 
July 27, 1916 
Jan. 21, 1927 
July 14, 1960 
May 17, 1950 
BARBERS POINT HARBOR, OAHU, HI (See Section 1 of Text) 
An entrance channel 42 feet deep, 450 feet wide, and 3,100 
feet long; an inshore basin of about 46 acres, 38 feet deep; 
a breakwater on the north side of the entrance channel, if 
model study shows it to be necessary; spending beaches with 
wave absorbers within the harbor totaling 1,320 feet in 
length; and a main access channel 12 feet deep, 80 feet wide, 
and 1,200 feet long to a small-boat harbor on the west side 
of the deep-draft harbor to be developed by local interests. 
HONOKOHAU SMALL BOAT HARBOR, HAWAII, HI 
(See Section 2 of Text) 
Provide for an inshore harbor basin with an entrance and access 
channel 840 feet long, 120 feet wide, 20 feet deep at the 
outer end and 15 feet at the inner end; a main access channel 
660 feet long, 120 feet wide, and 15 feet deep in the outer 
end and 12 feet in the inner portion; a short interior 
channel to the service area 200 feet long, 75 feet wide, 
15 feet deep; wave absorbers; and a wave trap. 
HONOLULU, HARBOR, OAHU, HI (See Section 3 of Text) 
Deepening to 35 feet the inner harbor with a general width of 
1,200 feet and casing the curve between the entrance channel 
and the inner harbor. 
For the channel 1,000 feet long. 
Channel connecting Honolulu Harbor and Kapalama Basin. 
Enlarging entrance channel to present project dimensions, 
widening of the harbor basin by 320 feet and the maintenance 
of the improved 400-foot wide portion of the reserved channel. 
A depth of 35 feet over the full width of 600 feet throughout 
the reserved channel; a turning basin in Kapalama Basin 
35 feet deep by 1,000 feet wide and 3,000 feet long; and a 
slip of like depth 1,000 feet long on the easterly side of 
Pier 39. 
The second entrance channel; and installation of a 
moveable-type bridge across the 2d entrance channel. 
(Modified by the Chief of Engineers.) 
Reopening Fort Armstrong entrance channel to 45 feet, Main 
Harbor Basin and Kapalama Channel to 40 feet, and relocating 
existing project lines. 
KAHULUI HARBOR, MAUI, HI (See Section 4 of Text) 
Extending east breakwater and dredging the basin. 
For the west breakwater. 
Extend both breakwaters and enlarge dredged basin. 
Enlarge harbor basin, 600 feet wide, 2,400 feet long, 35 feet 
deep. 
KAWAIHAE HARBOR, HAWAII, HI (See Section 5 of Text) 
Provide for a basin 35 feet deep below mean lower low water 
and 1,250 feet square with an entrance channel 40 feet deep, 
400 feet wide, and approximately 2,900 feet long extending 
northwestward to deep water in the ocean, and a protective 
breakwater about 4,400 feet long with maximum crest elevation 
13 feet above mean lower low water, of which the seaward 
3,200 feet shall be protected by heavy stone revetment. 
H. Doc. 93, 89th Cong., 1st sess. 
H. Doc. 68, 89th Cong., 1st sess. 
Annual Report, 1905, p. 2565. 
H. Doc. 392, 64th Cong., 1st sess. 
H. Doc. 753, 69th Cong., 2d sess. 
H. Doc. 54, 73d Cong., 1st sess. 
H. Doc. 705, 79th Cong., 2d sess. 
H. Doc. 717, 81st Cong., 2d sess. 
(Contains latest published map). 
H. Doc. 93, 89th Cong., 1st sess. 
H. Doc. 593, 61st Cong., 2d sess. 
H. Doc. 1330, 62d Cong., 3d sess. 
H. Doc. 235, 69th Cong., 1st sess. 
H. Doc. 109, 86th Cong., 1st sess. 
(Contains latest published map). 
H. Doc. 311, 81st Cong., 1st sess. 
1091

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 36-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 27, 1965 Widening the entrance channel to 500 feet at the outer end H. Doc 75, 89th Cong., 1st sess. 
tapering to the existing 520-foot width at the inner end; 
enlarging the deep-draft basin by widening by a maximum of 
200 feet and lengthening by a maximum of 500 feet; extending 
the existing breakwater by 750 feet if the need is 
demonstrated by hydraulic model tests; constructing a wave 
absorber 1,075 feet long at the inner end of the deep-draft 
basin; dredging the boat harbor access channel, 900 feet 
long, 80 to 100 feet wide, and 8 to 10 feet deep, for a small 
boat basin at the inner end of the harbor, protected by the 
proposed wave absorber; and constructing a protective mole 
190 feet long. 
LAHAINA SMALL BOAT HARBOR, MAUI, HI (See Section 6 of Text) 
A revetted mole 620 feet long; offshore breakwater 950 feet 
long; turning basin and main access channel of 140,000 
square feet; entrance channel 515 feet long, 150 feet 
wide, 15 feet to 20 feet deep; and a wave absorber 180 feet 
long. 
MAUNALUA BAY SMALL BOAT HARBOR, OAHU, HI 
(See Section 7 of Text) 
An east revetted mole 2,900 feet long; a west revetted mole 
1,950 feet long; an entrance channel 870 feet long, 200 feet 
wide, 15 feet to 20 feet deep; a widened channel section of 
370,000 square feet, 15 feet deep. 
WAIKIKI BEACH OAHU, HI (See Section 11 of Text) 
A plan comprising artificial placement of suitable sand fill 
in amount of approximately 385,000 cubic yards (not more 
than 185,500 cubic yards of which are applicable to the 
publicly owned shore) on the shore to widen the beach berm 
to widths of 75 to 150 feet, construction of 1,200 feet of 
terrace wall, 2 groins and appurtenant drainage facilities 
for the protection and improvement of the publicly owned 
portions of the shore of Waikiki Beach from the War Memorial 
Natatorium to the southeast boundary of Fort DeRussy. 
A project for restoration and protection of the shore of 
Waikiki Beach from Duke Kahanamoku Beach to the Elks Club 
under a plan comprising artificial placement of beach fill 
on the shore to widen the beach to widths of 75 to 180 feet, 
construction of approximately 8 new groins and appurtenant 
drainage facilities and modification of 3 existing groins. 
H. Doc. 353, 88th Cong., 2d sess. 
H. Doc. 353, 88th Cong., 2d sess. 
H. Doc. 227, 83d Cong., 1st sess. 
H. Doc. 104, 89th Cong., 1st sess. 
1092 
Oct. 27, 1965 
Oct. 27, 1965 
Sep. 3, 1954 
Oct. 27, 1965

HONOLULU, HAWAII, DISTRICT 
TABLE 36-C OTHER AUTHORIZED NAVIGATION PROJECTS 
Project 
Ala Wai Small Boat Harbor, Oahu 
Haleiwa Small Boat Harbor, Oahu 
Hana Small Boat Harbor, Maui 
Hanalei Bay Small Boat Harbor, Kauai 
Heeia-Kea Small Boat Harbor, Oahu 
Hilo Harbor, Hawaii 
Kailua Small Boat Harbor, Oahu 
Kalaupapa Harbor, Molokai 
Kaunakakai Harbor, Molokai 
Kikiaola Small Boat Harbor, Kauai 
Keehi Lagoon, Oahu 2 
Maalaea Small Boat Harbor, Maui 
Manele Small Boat Harbor, Lanai 
Nawiliwili Harbor, Kauai 4 
Port Allen Harbor, Kauai4 
Reeds Bay Small Boat Harbor, Hawaii 
Waianae Small Boat Harbor, Oahu 
Wake Island Harbor, Wake Island 
Wells Harbor, Guam 4 
For Last 
Full Report 
See Annual 
Report for 
5 
1967 
1967 
1967 
1967 
1969 
1967 
1968 
1966 
5 
1956 
5 
1967 
1962 
1962 
1967 
1967 
1950 
1950 
Constructih 
255,397 
- 
- 
5,423,440 
157,997 
138,188 
3,348,000 
372,000 
2,127,724 
752,645 
2,488,056 
1. In addition $252,000 in Contributed Funds. 4. Completed. 
2. Abandonment authorized by R&H Act of 1965 (H. Doc. 5. No previous full report; project authorized by R&H Act 
93, 89th Cong., 1st sess.) of 1968. 
3. In addition $246,000 in Contributed Funds. 
TABLE 36-D OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Haleiwa Beach, Oahu 1967 $ 240,1481 $ - 
Hanapepe Bay, Kauai 1965 
Waimea Beach, Kauai 2 
1. In addition $160,098 in Contributed Funds. 
2. No previous full report; project authorized by R&H Act 
of 1958. 
1093 
Cost to June 30, 1970 
Operation & 
on Maintenance 
1,921,333 
75,762 
41,857 
3 
1,905,698 
337,416 
14,493 
2,111

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 36-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Hanapepe River, Kauai, HI2 1967 $ 784,8671 $ - 
lao Stream, Maui, HI - - 
Kaunakakai Stream, Molokai, HI2 1950 73,748 
Kawainui Swamp, Oahu, HI2 1967 1,265,567 
Wailoa Stream and Tributaries, Hawaii, HI2 1966 1,044,888 
1. In addition Contributed Funds in $11,953 received and 3. No previous full report; project authorized by Flood 
expended. Control Act of 1968. 
2. Completed. 
TABLE 36-F COMPLETED FLOOD PLAIN STUDIES 
(See Section 19 of Text) 
Location Requesting Agency Date Completed Federal Cost 
Anahola, Kauai Department of Land and Natural Resources, State of Hawaii November 1969 $15,000 
East Molokai, Molokai, Hawaii Department of Land and Natural Resources, State of Hawaii January 1966 22,952 
Hanalei, Kauai Department of Land and Natural Resources, State of Hawaii January 1965 24,077 
Kaaawa, Oahu Department of Land and Natural Resources, State of Hawaii August 1969 19,000 
Kaumana-Punahoa, Hawaii, Hawaii Department of Land and Natural Resources, State of Hawaii March 1965 19,184 
Kihei Area, Maui Department of Land and Natural Resources, State of Hawaii January 1970 32,900 
Koloa-Poipu, Kauai, Hawaii Department of Land and Natural Resources, State of Hawaii October 1966 7,974 
Pupukea-Paumalu Department of Land and Natural Resources, State of Hawaii November 1968 14,000 
1094

PORTLAND, OREG., DISTRICT* 
Territorial limits of Portland District include southerly 
portion of the State of VWashington which lies 
within watershed of Columbia River and tributaries 
downstream from a point between Klickitat River and 
Rock Creek; that portion of State of Oregon within 
Columbia River watershed below John Day Dam site 
and west of watershed of John Day River and 
tributaries, together with south central Oregon west of 
Malheur River and Steens Mountain, but not including 
that part which drains into Klamath Lake and 
River. Coastal drainage area of Oregon is also 
included. 
IMPROVEMENTS 
Navigation Page 
1. Chetco River, Oreg. .............................. 1096 
2. Columbia and Lower Willamette 
Rivers below Vancouver, Wash., and 
Portland, Oreg. .................................. 1096 
3. Columbia River at Baker Bay, Wash. 1098 
4. Columbia River at the Mouth, Oreg. 
and W ash. ...................... 1098 
5. Columbia River between Chinook, 
Wash., and Head of Sand Island ..... 1099 
6. Columbia River between Vancouver, 
Wash., and The Dalles, Oreg ............ 1099 
7. Coos Bay, Oreg .................................. 1100 
8. Coos and Millicoma Rivers, Oreg ........ 1101 
9. Coquille River, Oreg ......................... 1101 
10. Cowlitz River, Wash ...................... 1102 
11. Depoe Bay, Oreg ................................ 1102 
12. Elochoman Slough, Wash. .................. 1102 
13. Lewis River, Wash ............................. 1102 
14. Rogue River, Harbor at Gold Beach, 
Oreg ..... ................ ........... 1103 
15. Siuslaw River, Oreg ........................... 1103 
16. Skipanon Channel, Oreg. ........................ 1104 
17. Tillamook Bay and Bar, Oreg ............ 1104 
18. Umpqua River, Oreg ........................ 1105 
19. Willamette River above Portland and 
Yamhill River, Oreg ...................... 1106 
20. Willamette River at Willamette Falls, 
O reg . ...................................................... 1107 
21. Yaquina Bay and Harbor, Oreg........... 1107 
22. Yaquina River, Oreg ........................ 1108 
23. Reconnaissance and Condition Surveys. 1108 
24. Other Authorized Navigation Projects. 1108 
25. Navigation Work Under Special 
Authorization. ..................... 1108 
Alteration of Bridges. 
26. Other Authorized Bridge Alteration..... 1108 
* All cost and financial statements for projects are listed at the 
appear at the end of this chapter. 
27. 
28. 
29. 
30. 
31. 
32. 
33. 
Flood Control Page 
Applegate Lake, Rogue River Basin, 
O regon ......... ............ .............. 1108 
Blue River Lake, Oreg. ........................ 1109 
Cascadia Lake, Oreg. ........................... 1109 
Cottage Grove Lake, Oreg. .................... 1110 
Cowlitz Couny Consolidated Diking 
Improvement District No. 2, Wash. .. 1110 
Dorena Lake, Oreg ............................ 1110 
Elk Creek Lake, Rogue River Basin, 
Oreg ...................... ....... 1111 
34. Fall Creek Lake, Oreg. ........................ 1111 
35. Fern Ridge Lake, Oreg ........................... 1111 
36. Gate Creek Lake, Oreg. ....................... 1112 
37. Lower Columbia River Basin, Oreg. 
and Wash... ............ 1112 
38. Lower Columbia River Basin Bank 
Protection Works, Oreg. and Wash. . 1113 
39. Midland Drainage District, Columbia 
County, Oreg ................................... ... 1113 
40. Reedsport Levees, Umpqua River, Oreg. 1113 
41. Scappoose Drainage District, Oreg. ...... 1114 
42. Wahkiakum County Consolidated 
Diking District No. 1, Wash. .......... 1114 
43. Wahkiakum County Diking District 
No. 4, W ash ................................... 1114 
44. Washougal Area Levees, Clark County, 
W ash ................................................ 1114 
45. Willamette River Basin, Oreg. ............ 1115 
46. Willamette River Basin, Oreg. (Bank 
Protection) ....................................... 1115 
47. Inspection of Completed Flood Control 
Projects ........... ......... ................ . 1116 
48. Scheduling Flood Control Reservoir 
O perations ............................................. 1116 
49. Other Authorized Flood Control 
Projects ............................................. 1116 
end of this chapter. All other tables are referenced in text and also 
1095

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Flood Control (cont.) Page 
50. Flood Control Work Under Special 
Authorization ..................................... 1116 
Multiple-Purpose Projects Including Power 
51. Bonneville Lock and Dam, Oreg. and 
Wash. (Lake Bonneville) .................. 1116 
52. Cougar Lake, Oreg. .............................. 1117 
53. Detroit Lake, Oreg ............................ 1117 
54. Green Peter-Foster Lakes, Oreg. .......... 1118 
55. Hills Creek Lake, Oreg. ....................... 1119 
56. Lookout Point Lake, Oreg. .................. 1119 
Multiple-Purpose Projects Including Power (cont.) Page 
57. Lost Creek Lake, Rogue River Basin, 
Oreg. .................................... 1120 
58. The Dalles Lock and Dam, Wash. and 
Oreg. (Lake Celilo) ........................... 1120 
59. Other Authorized Multiple-Purpose 
Projects Including Power ..................... 1121 
60. 
61. 
62. 
General Investigations 
Surveys ..................................... 1121 
Collection and Study of Basic Data ..... 1121 
Research and Development ................. 1122 
NAVIGATION 
1. CHETCO RIVER, OREG. 
Location. Rises in Siskiyou Mountains of Coast Range 
at an elevation of 4,000 feet, flows for about 51 miles in 
a circuitous route, and empties into Pacific Ocean at 
Brookings, Oreg., 300 miles south of entrance to 
Columbia River and 345 miles north of San Francisco 
Bay. (See Coast and Geodetic Survey Charts 5702 and 
5896.) 
Existing project. Construction of two jetties originally 
authorized was accomplished December 1957 at a cost 
of $489,554. Modification in 1965 authorized an 
entrance 120 feet wide and 14 feet deep; extension to 
north jetty about 450 feet in length with an increase in 
elevation of existing portion; a barge turning basin 
about 250 feet wide, 650 feet long, and 14 feet deep; a 
protective dike about 1,800 feet long with a top 
elevation of 18 feet; and a small-boat access channel 
100 feet wide and 12 feet deep. Mean lower low water is 
plane of reference. Tidal range in cove between lower 
low water and mean higher high water is 6.9 feet and 
extreme is from 2.6 feet below to 9.7 feet above mean 
lower low water. Estimated cost of project modification 
(1970) is $2,061,000. Existing project was authorized 
by 1945 River and Harbor Act (H. Doc 817, 77th 
Cong., 2d sess.) and 1965 River and Harbor Act (S. 
Doc. 21, 89th Cong., 1st sess. 
Local cooperation. River and Harbor Act of 1965 states 
that before construction local interests provide lands, 
easements, and rights-of-way for construction and 
future maintenance and aids to navigation upon 
request of Chief of Engineers, including suitable spoildisposal 
areas and necessary retaining dikes, bulkheads, 
and embankments therefor or the costs of such 
retaining works; hold United States free from damages; 
provide and maintain adequate public terminals and 
transfer facilities open to all equally; provide and 
maintain depths in berthing and mooring areas and 
local access channels serving the terminals, commensurate 
with depths provided in related project 
areas; accomplish alterations as required in sewer, 
water supply, drainage, and other utility facilities, as 
well as their maintenance; and contribute in cash 6.5 
percent of cost of construction by Corps of Engineers of 
small-boat access channel and that portion of dike 
adjacent thereto. A lump sum contribution in the 
amount of $14,800 was received from the Port of 
Brookings April 24, 1968, prior to initiating construction. 
Terminal facilities. At Sporthaven dock there is a 
private facility open to all on equal terms for loading 
lumber and wood chip barges. This facility is barely 
adequate for existing commerce. A small-boat basin is 
downstream from town of Harbor, Oregon. 
Operations and results during fiscal year. New work: A 
contract covering authorized excavation of entrance 
channel to 14 feet deep and 120 feet wide, increasing 
section of existing north jetty to a crest elevation of 18 
feet and construction of north jetty extension, was 
awarded June 1968 and completed July 1969. Contract 
for excavation of entrance channel, turning basin and 
small boat basin, and construction of a dike at the 
mouth of Chetco River was initiated September 1969 
and completed March 1970 with 246,300 cubic yards 
of material removed. Maintenance: Contract for 
removal and disposal of rock pinnacle and unconsolidated 
overburden was awarded June 30, 1970. 
Work to be accomplished in early fiscal year 1971. 
Condition at end of fiscalyear. Construction of jetties was 
completed December 1957. Removal of rock pinnacles 
and an abandoned bridge structure was accomplished 
in June 1959. Under authorized modification October 
1965, two contracts are completed. Construction of 
north jetty extension and excavation of entrance 
channel was initiated July 1968 and completed July 
1969; and construction of a dike at the mouth, and 
excavation of entrance channel, turning basin and 
small-boat basin were initiated September 1969 and 
completed March 1970. 
2. COLUMBIA AND LOWER 
WILLAMETTE RIVERS BELOW 
VANCOUVER, WASH., AND 
PORTLAND, OREG. 
Location. Project embraces 103 1/2 miles of Columbia 
River below Vancouver, Wash., and 14 miles of 
Willamette River below Portland, Oreg. For de- 
1096

PORTLAND, OREG., DISTRICT 
scription of Columbia River see Improvement No. 4 
and of Willamette River, Improvement No. 19. 
Previous project. For details see pages 1995 and 1998 of 
Annual Report for 1915, and page 1746 of Annual 
Report for 1938. 
Existing project. Provides for a channel 35 feet deep 
and 500 feet wide from river mile 106.5 to 105.5, 
distance between existing bridges; a channel 40 feet 
deep and 600 feet wide fro m Vancouver, Wash., river 
mile 105.5 to mouth of Columbia River, river mile 3; a 
turning basin at Vancouver, Wash., 40 feet deep, 800 
feet wide, and about 5,000 feet long; a turning basin at 
Longview, Wash., 40 feet deep, average width of 1,200 
feet, and about 6,000 feet long; and a channel 40 feet 
deep in Willamette River with varying widths of 600 to 
1,900 feet from mouth (river mile 0) to Broadway 
Bridge (river mile 11.6) which encompasses Portland 
Harbor area, subject to provisions that channel from 
mouth of Willamette River to turning basin at 
Vancouver, Wash., be limited to 500 feet in width until 
need for additional width is demonstrated by developed 
traffic. Existing project also provides for 
auxiliary channels 10 feet deep and 300 feet wide near 
Cathlamet, Wash.; 30 feet deep and 300 feet wide in St. 
Helens (Oreg.) Channel; and 30 feet deep and 500 feet 
wide connecting upper end of St. Helens Channel with 
main ship channel of Columbia; 24 feet deep and 200 
feet wide along frontage of town of Rainier, Oreg., 
extended at its upper and lower ends to deep water in 
Columbia River, 8 feet deep and 150 feet wide from 
this depth in Columbia River through old mouth of 
Cowlitz River to a point about 3,000 feet upstream 
from present terminus of harbor line; a channel from 
Longview Port dock downstream along pierhead line 
and past Weyerhaeuser Timber Co. plant at Longview 
to a connection with main ship channel below Mount 
Coffin, the downstream 2,400 feet of this channel to be 
30 feet deep and 300 feet wide and remainder to be 28 
feet deep and 250 feet wide; construction of a smallboat 
mooring basin at Astoria, Oreg., to include a 
sheet-pile, sandfilled breakwater about 2,400 feet long 
with a 30-foot roadway along its full length, and 
steelpile shore wings totaling about 1,460 feet long and 
for construction of stone-and-pile dikes and revetments. 
Plane of reference in estuary from mouth to Harrington 
Point is mean lower low water; thence to 
Portland and Vancouver, low water. Tidal range 
between mean lower low water and mean higher high 
water at mouth of Columbia is about 8 feet, and at 
Portland and Vancouver about 2 1/2 feet at low stages 
of rivers. Extreme tidal ranges are about 13 and 3 feet, 
respectively. Annual freshets have little effect on depths 
at mouth of Columbia; at Portland and Vancouver 
they average about 20 feet, while highest known 
reached a stage of 33 feet above low water at Portland. 
Estimated Federal cost of new work (1970) is $25,300, 
000. (See table 37-B for authorizing legislation.) 
Local cooperation. River and Harbor Act of 1962 
provides that local interests furnish lands and rights-ofway 
for construction and future maintenance and aids 
to navigation upon request of Chief of Engineers, 
including suitable spoil-disposal areas and necessary 
retaining dikes, bulkheads, and embankments therefor 
or costs of such retaining works; hold the United States 
free from damages; provide and maintain adequate 
public terminal and transfer facilities open to all on 
equal terms; make alterations as are required in sewer, 
water supply, drainage, and other utility facilities for 
construction and maintenance of the project; assist in 
work of improving and maintaining main ship channel 
in Columbia and Willamette Rivers by loaning the 
United States a suitable pipeline dredge in good 
operating condition, with full crew and equipment, 
without charge other than reimbursement for full 
operating costs of dredge on a basis approved by Chief 
of Engineers, said operating costs to include proportionate 
maintenance costs based on period of time 
dredge is in use for the United States; provide and 
maintain depths in berthing areas and access channels 
serving terminals, including 50-feet adjacent to pierhead 
lines, commensurate with depths provided in 
related project areas; and contribute in cash 1.8 
percent of cost of construction of 40-foot channel by the 
Corps for enhancement of land owned by Port of 
Portland and contribute in cash 3.5 percent of cost of 
construction of 35-foot channel by the Corps, and that 
such contributions estimated at $386,000 be paid in 
lump sum prior to commencement of construction. 
This sum was paid in 1964. Total non-Federal cost is 
$521,000. 
Terminal facilities. At Portland, Oreg., there are 20 
terminals with facilities to handle general cargo, bulk 
grain, lumber, and miscellaneous other cargo. Also 
available at this facility to the public, are 10 fuel oil 
and gasoline wharves and piers, mechanical handling 
devices, and heavy lift equipment. Also within boundary 
of Portland harbor there are facilities for storing 12, 
680,000 bushels of grain for transhipment by water. At 
Astoria, Oreg., there is a large municipal terminal with 
a 1-million bushel capacity grain elevator and facilities 
for receiving and handling all types of general cargo. 
At Vancouver, Wash., there are two municipal 
facilities, capable of berthing five ships simultaneously. 
Each berth is completely outfitted with mechanical 
and heavy lift facilities for receiving and handling all 
types of cargo. 
Also available are two grain elevators with a total 
capacity of 7,500,000 bushels of grain. Port of Longview 
has a public terminal on Columbia River and a 
privately owned grain elevator with a capacity of 5, 
365,000 bushels. At other locations on Columbia River 
between Portland and Columbia River entrance there 
are sufficient private facilities to accommodate river 
vessels and fishing craft. These facilities, with planned 
extensions, are considered adequate for existing commerce. 
(For details see Port Series Nos. 33 and 34, 
Corps of Engineers, published in 1963 and 1962 
respectively.) 
Operations and results during fiscal year. New work: 
Dredging was underway with 1,621,605 cubic yards of 
1097

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
material removed, 611,401 by Government plant and 
1,010,204 by contract. Contracts were completed at the 
following locations in the Columbia River: dredging of 
Kalama and St. Helens Bars; construction of pile dikes 
at Lower Dobelbower and Kalama Bars; and construction 
of pile dikes at Stella-Fisher, Walker Island 
and Skamokawa Bars. Contract dredging of Upper 
and Lower Dobelbower Bars was 19 percent completed. 
Preparation of plans and specification for 
dredging of Stella-Fisher and Walker Island Bars was 
completed. Maintenance: A total of 5,643,767 cubic 
yards of material was removed, 108,146 by contract 
and 5,535,621 by U. S. Government hopper and 
pipeling dredges. 
Condition at end of fiscal year. Project as authorized by 
act of July 24, 1946, was completed September 1950. 
Main channel was completed in 1933, except that a 
revision at Harrington Point was made in 1935. Dikes 
were completed in 1935 and extension of Vancouver 
turning basin in 1939. Auxiliary channel in vicinity of 
Longview was completed in 1949, and improvement of 
mouth of Cowlitz River and small boat mooring basin 
at Astoria were completed in 1950. Dredging 40-foot 
channel in Columbia River from Portland, Oreg. and 
Vancouver, Wash. to the sea as authorized by Act of 
October 23, 1962, is 58 percent complete. Project 
depths are maintained all year except during short 
shoaling periods following freshets which generally 
occur in May, June, and July. In Columbia and 
Willamette Rivers between mouth and Broadway 
Bridge at Portland a draft of 33 feet at low tide and 35 
feet at high tide is practicable all year. In Columbia 
River between mouth of Willamette River and 
Vancouver, Wash., drafts of 28 and 30 feet at low and 
high tide, respectively, are practicable all year. (See 
table 37-C for total cost of existing project to June 30, 
1970.) 
3. COLUMBIA RIVER AT BAKER BAY, 
WASH. 
Location. Baker Bay is a shallow body of water about 
15 square miles in extent on north side of Columbia 
River near its mouth. Bay is separated from river by 
Sand Island, a low-lying sand bar only a few feet above 
high tide level. (See Coast and Geodetic Survey Chart 
6151.) 
Existing project. A main channel, 10 feet deep and 200 
feet wide extending through easterly passage at Sand 
Island to port of Ilwaco, a distance of about 5 miles; a 
mooring basin 10 and 12 feet deep, about 20 acres in 
extent, east of port of Ilwaco dock, with protecting 
breakwaters; and a west channel 10 feet deep connecting 
basin with deep water in Columbia River, with 
a width of 150 feet, increased to 200 feet for 2,000 feet 
at southerly end. Mean lower low water is plane of 
reference. Tidal range between mean lower low water 
and mean higher high water is about 8 feet, and 
extreme about 13 feet. (See 37-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Wharves, floats, ramps, and berths, 
for fishing craft, barges and towboats. Small-boat basin 
and protecting breakwater provides moorings for 
numerous fishing and recreational craft all year. 
Facilities are considered adequate for existing commerce. 
Operations and results during fiscalyear. Maintenance: U. 
S. pipeline dredge Wahkiakum removed 281,880 cubic 
yards of material from the west channel. 
Condition at end of fiscal year. Channel extending 
through easterly passage of Sand Island was completed 
in 1934. Dredging west channel to 8 feet was 
accomplished September 1948. Deepening west channel 
to 10 feet, and boat basin and breakwater 
construction at Ilwaco, Wash., finished December 
1957, completed the project. 
4. COLUMBIA RIVER AT THE MOUTH, 
OREG. AND WASH. 
Location. Rises in British Columbia, through which it 
flows for 425 miles. It enters the United States in 
northeastern Washington, flows southerly to mouth of 
Snake River, thence westerly between Oregon and 
Washington, and empties into Pacific Ocean 645 miles 
north of San Francisco Bay and 160 miles south of 
Strait of Juan de Fuca. Total length of river is 1,210 
miles. (See Coast and Geodetic Survey Charts 5902, 
6151, 6152, 6153, 6154, 6155, and 6156; also Geological 
Survey map of Washington.) 
Previous project. For details see page 1999, Annual 
Report for 1915 and page 174 of Annual Report for 
1938. 
Existing project. Provides for a channel across bar of 
suitable alinement with depth of 48 feet at mean lower 
low water for a width of one-half mile, to be secured by 
dredging and construction of a spur jetty on north 
shore. Tidal range on bar between mean lower low 
water and mean higher high water is about 8 feet, and 
extreme tidal range is about 13 feet. Estimated Federal 
cost for new work (1970) is $29,270,000 which includes 
$2,670,000 for additional recreation facilities at completed 
project, but excludes $9,660,000 for jetty 
rehabilitation. (See table 37-B for authorizing legislation.) 
Local cooperation. Estimated cost of local cooperation 
on basis of cost-sharing for additional recreation 
facilities is $2,670,000. 
Operations and results during fiscal year. New work: 
Engineering and design studies are under way for 
additional recreation facilities at Fort Canby State 
Park. Model study of mouth of Columbia River is near 
completion at Waterways Experiment Station, 
Vicksburg, Miss. Report on study to be prepared in 
fiscal year 1971. Maintenance: U. S. hopper dredges 
Biddle and Harding removed 1,507,360 cubic yards of 
material from the entrance channel. 
Condition at end of fiscal year. Existing project is 51 
percent complete. Project as originally authorized, 
consisting of extension of south jetty constructed under 
previous project, construction of north jetty, and 40- 
1098

PORTLAND, OREG., DISTRICT 
foot channel depth over entrance bar, was completed in 
1918. Dredging 48-foot bar channel was completed 
September 1957. Rehabilitation of south jetty was 
completed with new work funds September 1964 and 
rehabilitation of north jetty in March 1965. Total costs 
to June 30, 1970, from Federal funds for existing 
project were $40,144,729 of which $14,966,199 was for 
new work, $4,040,879 for jetty restoration and $21,137, 
651 for maintenance. In addition, $475,000 and $25, 
000 contributed by Ports of Portland and Astoria, 
Oreg., respectively, were expended for new work. 
5. COLUMBIA RIVER BETWEEN 
CHINOOK, WASH., AND HEAD OF 
SAND ISLAND 
Location. At easterly end of Baker Bay, lying on north 
side of Columbia River near mouth. (See Coast and 
Geodetic Survey Chart 6151.) 
Existing project. Channel 10 feet deep and 150 feet 
wide, extending from head of Sand Island to Chinook: 
a turning and mooring basin at upper end of channel, 
10 feet deep, 660 feet long, and ranging from 275 to 500 
feet wide; reconstruction of easterly 393 feet of existing 
breakwater; and extension of existing breakwater 
easterly and thence northerly to connect with shore in 
vicinity of Portland Street, Chinook, Wash. Tidal 
range between mean lower low water and mean higher 
high water is about 8 feet and extrene tidal range about 
13 feet. Federal cost for new work is $220,283, exclusive 
of $84,930 for minor breakwater rehabilitation. (See 
table 37-B for authorizing legislation.) 
Local cooperation. Complied with except to provide 
and maintain without cost to United States adequate 
terminal and mooring facilities including a public 
landing with suitable supply facilities open to all on 
equal terms. 
Terminal facilities. Chinook Packing Co. owns a wharf 
for receiving fresh fish. A portion of wharf is also used 
as a public landing. At upper end of channel there is a 
turning and mooring basin with facilities for mooring 
350 fishing and recreational craft. Adequate terminal 
and mooring facilities including a public landing with 
suitable supply facilities are to be installed by local 
interests. 
Operations and results during fiscal year. Maintenance: 
Project condition surveys were conducted in February 
and March 1970. 
Condition at end of fiscal year. As originally authorized 
was completed in 1940. The 10-foot channel depth 
modification was accomplished September 1958. Rehabilitation 
of existing breakwater was completed 
September 1962. 
6. COLUMBIA RIVER BETWEEN 
VANCOUVER, WASH., AND THE 
DALLES, OREG. 
Location. On Columbia River, between Interstate 
Bridge at Vancouver, Wash., 106.5 miles above mouth 
and The Dalles, Oreg., mile 191, a distance of 84.5 
miles. For description of Columbia River, see Improvement 
No. 4, "Columbia River at the Mouth." 
Existing project. Channel 27 feet deep at low water and 
300 feet wide between Vancouver, Wash., and The 
Dalles, Oreg., 84.5 miles; a channel 10 feet deep at low 
water and 300 feet wide at upstream entrance to 
Oregon Slough, Oreg., a suitable turning basin 
adjacent to site of port development in vicinity of 
Camas and Washougal, Wash., a boat basin at Hood 
River, Oreg., 500 by 1,300 feet and 10 feet deep at 
normal Bonneville pool level, with a connecting 
channel of same depth to deepwater, and a protecting 
breakwater on easterly side; a barge channel to 
waterfront at Bingen, Wash., 10 feet deep at normal 
Bonneville pool level, 200 feet wide and about 1 mile 
long, and an access channel 7 feet deep at normal 
Bonneville pool level, 100 feet wide and about 1,000 
feet long, to a natural mooring basin for small boats 
near east end of channel; and construction of The 
Dalles Harbor, Oreg., to provide a breakwater and 
shear boom protected basin about 400 by 800 feet in 
size with depth of 8 feet below a pool elevation of 72.5 
feet at mean sea level. Tidal range between mean lower 
low water and mean higher high water at Vancouver is 
about 2 1/2 feet and at Bonneville about 0.2 foot at low 
stages of the river. Extreme tidal ranges are about 4 feet 
and 0.4 foot, respectively. Annual freshets average 
about 21 feet at Vancouver, while the highest known 
stage reached 33 feet above low water. (See table 37-B 
for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. At Vancouver, Wash., immediately 
upstream from the two highway bridges are a privately 
owned sand and gravel facility, a Coast Guard dock, a 
private towboat moorage equipped with marine 
railway and shipbuilding facilities, and facilities for 
transfer of bulk petroleum from river barges. (For 
further details concerning facilities at Vancouver see 
Port Series No. 33, Corps of Engineers, published in 
1963.) In northern section of Portland, Oreg., on south 
bank of Columbia River, about 1.7 miles upstream 
from interstate bridges, is a wharf with a 110-ton 
derrick used for transfer of cargoes between trucks and 
barges. About 3.5 miles upstream from interstate 
bridges are two liquid-fertilizer storage tanks each with 
a capacity of 229,000 gallons. This facility has 
necessary equipment for unloading tanker barges and 
loading trucks. At Camas, Wash., about 13.5 miles 
upstream from Vancouver, there is a private wharf 
used for transfer of papermill supplies and paper to and 
from barges, and facilities for discharging bulk oils 
from barges. Port of Camas-Washougal has a wharf 
528 feet long at Washougal, Wash. At port of The 
Dalles (mile 44 above Bonneville) there is a municipal 
wharf 125 by 1,100 feet for use by both ocean vessels 
and river boats. There are two 1-story timber and 
corrugated iron warehouses, each 94 by 461 feet, on this 
wharf with rail connections. There is also a municipal 
oil terminal consisting of a concrete and timber wharf 
27 by 193 feet, about a mile below main wharf. There 
are private storage tanks with a total capacity of 2,300, 
000 gallons near this terminal for handling petroleum 
1099

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
products. Storage tanks have rail, truck and water 
connections. A private elevator with a capacity of 40, 
000 bushels and a public elevator of 868,000-bushel 
capacity for handling bulk grain to river craft are also 
at The Dalles. Public elevator has rail, truck, and water 
connections. There is a privately owned rail connection 
about three-fourths mile below municipal wharf where 
certain types of cargo may be handled between 
railroad cars and river boats or barges by means of a 
derrick of up to 22-ton capacity. At numerous locations 
over entire waterway are log rollways for transfer of 
logs to water from trucks and public and private boat 
basins. Facilities are considered adequate for present 
commerce. 
Operations and results during fiscalyear. Maintenance: A 
total of 355,129 cubic yards of material was removed by 
U. S. pipeline dredge. Luckiamute. Pile dikes repair 
contract essentually completed. 
Condition at end of fiscal year. Existing project is 
complete. Construction of The Dalles Harbor, Oreg., 
was completed in 1949. Channel dredging at upper end 
of Oregon Slough was accomplished in 1957. Project 
depth of 27 feet between Bonneville and The Dalles, 
Oreg., was achieved April 1959. The 27-foot channel 
depth between Vancouver, Wash., and Bonneville, 
Oreg., except for removal of some submerged rock and 
dredging , was completed May 1960. Improvement of 
lower entrance of Bonneville Dam lock was completed 
in May 1961. Construction of a boat basin at Hood 
River, Oreg., and of Camas-Washougal, Wash., 
turning basin was accomplished February 1962. 
Construction of a barge channel in Columbia River 
near Bingen, Wash., was completed October 1962, 
except for removal of rock pinnacles encountered. This 
was accomplished by contract September 1963. Construction 
of 15-foot barge channel under Interstate 
Highway bridge was completed December 1963 under 
Section 107 of the 1960 River and Harbor Act. 
7. COOS BAY, OREG. 
Location. On Oregon coast 200 miles south of mouth 
of Columbia River and 445 miles north of San 
Francisco Bay. It is about 13 miles long and 1 mile 
wide, with an area at high tide of about 15 square 
miles. (See Coast and Geodetic Survey Charts 5802 
and 5984.) 
Previous projects. For details see page 1987 of Annual 
Report for 1915, and page 1728 of Annual Report for 
1938. 
Existing project. Two rubblemound, high-tide jetties at 
entrance; a channel across outer bar 40 feet deep at 
mean lower low water, and a suitable width with 
dimensions reduced gradually to Guano Rock; a 
channel 30 feet deep at mean lower low water and 
generally 300 feet wide thence to mouth of Isthmus 
Slough; turning basins of same depth and 1,000 feet 
long and 600 feet wide opposite Coalbank Slough and 
at city of North Bend; anchorage basins 30 feet deep, 
600 feet wide by 2,000 feet long at mile 3.5 and near 
mile 7; a channel 22 feet deep and 150 feet wide from 
Smith's Mill (mouth of Isthmus Slough) to Millington; 
a mooring basin, about 500 by 900 feet, for small boats 
at Charleston, with a connecting channel, 10 feet deep 
and 150 feet wide, to deep water in Coos Bay, and 
construction of a protecting breakwater and bulkhead. 
(See table 37-B for authorizing legislation.) Plane of 
reference is mean lower low water. Tidal range 
between higher high water and plane of reference and 
extreme tidal range at entrance are 7 feet and about 11 
feet, respectively, and at Coos Bay 7.3 and 11 feet, 
respectively. 
Recommended Modificaton. To provide for a channel 45 
feet deep and 700 feet wide across the outer bar, 
dimensions reducing gradually to 35 feet deep and 300 
feet wide near Guano Rock; and inner channel 35 feet 
deep and 300 feet wide from that point to about mile 9, 
thence 35 feet deep and generally 400 feet wide to mile 
15; deepening and widening the existing turning basins 
to 35 feet by 650 feet; and anchorage area, near mile 6, 
1,200 feet wide, 2,000 feet long, and 35 feet deep; and 
abandonment of existing authorized anchorages at 
mile 3.5 and mile 7. Estimated Federal cost is $11,500, 
000. Estimated Non-Federal cost is $121,000. 
Local cooperation. Fully complied with. 
Terminal facilities. At North Bend there is a municipal 
dock 649 feet long fronting on channel, about 2,380 feet 
of privately owned mill docks, and three oil-receiving 
terminals in vicinity. At Coos Bay there is a privately 
owned dock with a frontage of 1,345 feet, open to the 
public on equal terms; several small landings for 
fishing and harbor craft; and three lumber docks with 
1,300-, 576-, and 500-foot frontages, respectively. At 
Eastside, on Isthmus Slough, there is a 200-foot dock to 
accommodate coastal lumber schooners. At Empire 
there is a privately owned lumber dock with frontage of 
510 feet, and an oil terminal, also privately owned, for 
receipt of petroleum products by barge. About 1 1/2 
miles below Empire there is a privately owned pulp 
mill dock with a frontage of 480 feet. At Charleston 
there are four wharves, one public and three private, 
with usable areas of 1,200, 750, 7,000 and 12,000 
square feet, respectively, for receipt of fresh fish and 
shellfish and a large seafood receiving and processing 
plant. There is also a municipally owned small-boat 
basin, open to all on equal terms, capable of mooring 
250 fishing and recreation craft. Servicing facilities for 
small craft are available at all facilities, and public 
launching ramps have been constructed in Charleston 
area by private interests. A privately owned floating 
moorage on Joe Slough has facilities for mooring about 
50 fishing vessels. At Jordan Cove area there is a dock, 
248 feet long, for wood chip ships. These facilities are 
considered adequate for existing commerce. (For 
details see Port Series No. 33, Corps of Engineers, 
published in 1963.) 
Operations and results during fiscal year. New work: 
Dredging under Section 107 of the 1960 River and 
Harbor Act for extension in South Slough near 
Charleston, Oregon, was accomplished by U. S. hopper 
dredge. Pacific. A total of 35,300 cubic yards of material 
1100

PORTLAND, OREG., DISTRICT 
was removed. Maintenance: Contract dredging removed 
1,906,931 cubic yards of material and U. S. 
hopper dredge. Pacific and Harding removed 1,761,910 
cubic yards. A contract for repair of north jetty, 
initiated June 8, 1970, was 45 percent completed. 
Condition at end of fiscal year. South jetty was completed 
in 1928, north jetty in 1929, and 24-foot channel in 
1937. The South jetty was restored in 1941 and 1942 by 
construction of a concrete cap for full length of the 
jetty. Excavation of channel to 30 feet deep and 
generally 300 feet wide from entrance to Isthmus 
Slough was completed in 1951. Dredging outer bar 
channel to a depth of 40 feet, decreasing to 30 feet at 
Guano Rock was completed in 1952. Existing project 
was completed September 1956 with construction of 
small boat basin at Charleston, Oreg. Rehabilitation of 
south jetty was started in June 1962 and completed 
December 1963. Extension in South Slough under 
Section 107 was accomplished in May 1970. Total 
Federal costs to June 30, 1970, for existing project were 
$28,961,545 of which $8,103,821 was for new work, $2, 
335,966 for jetty restoration and $18,521,758 for 
maintenance. In addition $43,513 for new work and 
$8,387 for maintenance from contributed funds were 
expended. 
8. COOS AND MILLICOMA RIVERS, 
OREG. 
Location. South Fork and Millicoma Rivers rise in 
Coast Range in southern Oregon, flow generally 
westerly and join to make Coos River, 5.3 miles above 
mouth of Coos River in Coos Bay. (See Geological 
Survey, Coos Bay Quadrangle.) 
Existing project. Originally authorized project; a 
channel depth of 3 feet, generally, from mouth of coos 
river and 1 foot near head of navigation. Project as 
modified; two channels 5 feet deep and 50 feet wide 
from mouth of Coos River to Allegany on Millicoma 
River, mile 13.8 and to Dellwood on South Fork, mile 
14, and thence a channel 3 feet deep and 50 feet wide to 
mile 14.7 on South Fork, including stabilization works 
on Coos River. Mean lower low water is plane of 
reference. Tidal range between higher high water and 
plane of reference and extreme tidal ranges under 
ordinary conditions at mouth of Coos River are 7.3 and 
11 feet, respectively, and there is a tidal range of about 
1 foot at head of navigation in both forks. Freshet stages 
usually reach a height of from 10 to 15 feet at Allegany, 
head of navigation on Millicoma River. Existing 
project was authorized by River and Harbor Acts of 
June 3, 1896 (H. Doc. 237, 53d Cong., 3d sess.) and 
modified June 30, 1948 (S. Doc. 124, 80th Cong., 2d 
sess.). Latest published maps are in these documents. 
Local cooperation. Fully complied with. 
Terminal facilities. Several small privately owned 
docks and landing places on the river are used by 
towboats and pleasure craft. There are no publicly 
owned docks. Present facilities are considered adequate 
for existing commerce. Project modification provides 
451-584 0-72-70 
for construction of terminal facilities open to all on 
equal terms. 
Operations and results during fiscal year. Maintenance: 
Dredging of 3,000 cubic yards of material was 
accomplished by equipment rental contract. 
Condition at end of fiscal year. Originally authorized 
project providing for a channel from mouth of Coos 
River to head of navigation in both forks, to provide a 
depth of 3 feet generally and 1 foot near head of 
navigation, was completed in 1899. In March 1966 
construction of project as modified by 1948 River and 
Harbor Act has been accomplished except for removal 
of rock encountered, which was accomplished in 
August 1966. Since scour that had been anticipated in 
Coos River has not developed, it has been recommended 
that construction of stabilization work be 
held in abeyance until need has been established. 
9. COQUILLE RIVER, OREG. 
Location. Rises in Coast Range, flows generally westerly 
for about 100 miles, and empties into Pacific 
Ocean at Bandon, Oreg., 225 miles south of mouth 
of Columbia River and 420 miles north of San 
Francisco Bay. (See Coast and Geodetic Survey 
Charts 5802 and 5971.) 
Previous projects. For details see page 1986 of Annual 
Report for 1915, and page 1727 of Annual Report for 
1938. 
Existing project. Two rubblemound high-tide jetties at 
river mouth, south jetty 2,700 feet long and the north, 
3,450 feet long; and a channel 13 feet deep at mean 
lower low water and of suitable width from the sea to a 
point 1 mile above old Coquille River Lighthouse, and 
snagging to State highway bridge at city of Coquille. 
Mean lower low water is plane of reference. Tidal 
range between mean lower low water and mean higher 
high water at mouth is 6.8 feet and extreme range 
about 10 feet. (See table 37-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. At Bandon: A privately owned mill 
dock used exclusively for shipping lumber on coastwise 
vessels, a publicly owned wharf, and a small-boat basin 
open to all equally. Above Bandon, on navigable 
waterway: A privately owned lumber shipping facility 
and numerous log booms and rollways. Facilities are 
considered adequate for present commerce. 
Operations and results during fiscal year. Maintenance: 
Dredging entrance channel by Government hopper 
dredge removed 34,900 cubic yards of material. 
Condition at end of fiscal year. Jetties were completed in 
1908 and entrance channel in 1933. North jetty was 
reconstructed in 1942 and a 750-foot extension to 
easterly end was constructed in 1951. South jetty was 
repaired in 1954 and north jetty in 1956. Total Federal 
costs for existing project to June 30, 1970, were $2,184, 
237 of which $316,640 was for new work and $1,867, 
597 for maintenance. In addition, $72,891 was expended 
for new work from contributed funds. 
101

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
10. COWLITZ RIVER, WASH. 
Location. Rises in Cascade Range in Washington, 
flows westerly and southerly about 120 miles and 
empties into Columbia River about 69 miles from its 
mouth. (See Coast and Geodetic Survey Chart 6153.) 
Previous project. For details see page 2,000, Annual 
Report for 1915 and page 1763, Annual Report for 
1938. 
Existing project. A channel 4 feet deep at low water 
and 50 feet wide from mouth to Ostrander (9 miles), 2 
1/2 feet deep and 50 feet wide to Castle Rock (10 miles), 
and 2 1/2 feet deep at low water and not less than 40 feet 
wide to Toledo (18 miles) to be secured by snagging, 
dredging, and regulating works. Detailed project 
report covering modification of project to 8 feet deep 
and 100 feet wide in the lower 4.75 miles under Section 
107 of 1960 River and Harbor Act was approved 3 
January 1965. Water level due to tides, varies from 4 
feet at mouth to zero at Ostrander. During ordinary 
freshets a stage of 20 feet, and at extreme floods a stage 
of 25 feet is reached in river at Kelso, Wash. Existing 
project was adopted by 1910 River and Harbor Act (H. 
Doc. 1167, 60th Cong., 2d sess., from mouth to Castle 
Rock, and H. Doc. 404, 61st Cong., 2d sess., from 
Castle Rock to Toledo). For latest published map see 
House Document 1167, 60th Congress, 2d session. 
Local cooperation. Fully complied with. 
Terminal facilities. Privately owned and operated 
landings, a sand and gravel dock, log rollways, and 
storage booms. Facilities are considered adequate for 
existing commerce. 
Operations and results during fiscal year. Maintenance: 
Preliminary dredging surveys under way. Scheduled 
dredging postponed until Fall 1970. 
Condition at end of fiscal year. Existing project was 
completed in 1913. Project as modified, under Section 
107 of the 1960 River and Harbor Act and approved 
January 1965, was completed August 1968. Above 
Kelso, channel is in poor condition. Total costs under 
existing project to June 30, 1970 were $842,376 of 
which $272,437 was for new work and $569,939 for 
maintenance. 
11. DEPOE BAY, OREG. 
Location. Harbor on Oregon coast 100 miles south of 
mouth of Columbia River. (See Coast and Geodetic 
Survey Chart 5902.) 
Existing project. Two breakwaters north of entrance; 
an entrance channel 8 feet deep and 50 feet wide; an 
inner basin 750 feet long, 390 feet wide and 8 feet deep 
with retaining wall along easterly side; and a stone 
spending beach. Mean lower low water is plane of 
reference. Tidal range between mean higher high 
water and plane of reference and extreme range at 
entrance is 7.8 feet and about 11.5 feet, respectively. 
(See table 37-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Facilities, in inner basin, consist of 
landings and floats to accommodate operators of 
excursion and commercial fishing boats. Facilities 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Ordinary operation and maintenance features carried 
on.
Condition at end of fiscal year. Project as originally 
authorized was completed in 1939 and project modification 
accomplished in June 1952 and August 1966. 
Maintenance contract initiated May 1967 was completedJuly 
1967. 
12. ELOCHOMAN SLOUGH, WASH. 
Location. A side channel of Columbia River, about 3 
1/2 miles long, on Washington side about 75 miles 
below Portland, Oreg. (See Coast and Geodetic Survey 
Chart 6152.) 
Existing project. A channel 10 feet deep and 100 feet 
wide extending from that depth in Columbia River 
near easterly end of slough to existing terminals near 
mouth of Elochoman River, a distance of about 1 1/2 
miles, with suitable turning basin of same depth at 
inner end. Detailed project report on a small-boat 
basin at Cathlamet, Wash., covering modification of 
project under Section 107 of the 1960 River and 
Harbor Act, as amended by Section 310 of the 1965 
River and Harbor Act was approved February 9, 1966 
authorizing project for construction. Project provides 
for an entrance channel 50-feet wide and 6-feet deep, 
and a breakwater with a top width of 10 feet and 
elevation of + 12 feet. Low water is plane of reference. 
Average tidal range during low water conditions in 
Columbia River is about 5 feet. Estimated Federal cost 
of new work is $206,300 Existing project authorized by 
1937 River and Harbor Act (H. Doc. 510, 74th Cong., 
2d sess. contains latest published map). 
Local cooperation. Fully complied with. Local interests 
contributed $10,800, March 10, 1969, which is 11 
percent of estimated first costs. An additional cash 
contribution of $60,000 was requested for accomplishment 
of local work consisting of dredging the 
mooring area by Federal contractor. 
Terminal facilities. Only terminals are privately owned 
wharves of Crown Willamette Paper Co., and International 
Wood Products Co. Present facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Preparation of plans and specifications for small boat 
basin is completed. Contract award scheduled for July 
1970. 
Condition at end of fiscal year. Project completed in 
1939. Preparation of plans and specifications for small 
boat basin under modification of project, Section 107, 
is completed. 
13. LEWIS RIVER, WASH. 
Location. Rises in Cascade Range in Washington, 
flows westerly and southwesterly 110 miles, and 
1102

PORTLAND, OREG., DISTRICT 
empties into Columbia River about 88 miles from its 
mouth. (See Coast and Geodetic Survey Charts 6153 
and 6154.) 
Previous projects. For details see page 2001, Annual 
Report for 1915, and page 1762, Annual Report for 
1938. 
Existing project. A low-water channel 6 feet deep and 
50 feet wide to mouth of East Fork (3 3/4 miles); 4 feet 
deep and 50 feet wide on East Fork from its mouth to 
La Center (3 miles); 4 feet deep and 50 feet wide on 
Lewis River (North Fork) and from East Fork to 
Woodland (2 1/2 miles), secured by dredging and 
construction of regulating works and clearing channel 
to Ariel (16 miles from Woodland). Maximum 
variation of water level, due to tide, ranges from about 
3 feet at mouth to 1 1/2 feet at La Center and zero at 
Woodland. During ordinary freshets a stage of 14 feet 
and, at extreme floods, a stage of 24 feet is reached in 
main river at Woodland, Wash. Existing project was 
adopted by 1913 River and Harbor Act (H. Doc. 28, 
62d Cong., 1st sess.). For latest published map see page 
3557 of Annual Report for 1904. 
Local cooperation. None required. 
Terminal facilities. At Woodland on Lewis River there 
are several privately owned facilities for mooring, 
fishing and pleasure craft. Facilities considered adequate 
for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Dredging by U. S. pipeline dredge. Luckiamute removed 
125,361 cubic yards of material. 
Condition at end of fiscal year. Existing project was 
completed in 1927. Total cost for existing project to 
June 30, 1970 was $401,155 of which $35,880 was for 
new work and $365,275 for maintenance. 
14. ROGUE RIVER, HARBOR AT GOLD 
BEACH, OREG. 
Location. Rises in Cascade Range in southwestern 
Oregon, flows westerly through Coast Range, and 
empties into Pacific Ocean 264 miles south of mouth of 
Columbia River and 381 miles north of San Francisco 
Bay. (See Coast and Geodetic Survey Chart 5951.) 
Existing project. Two jetties at entrance, and a channel 
13 feet deep and 300 feet wide from ocean to a point 
immediately below State Highway Bridge, about 1 
mile, including widening channel at a point about 0.25 
mile below bridge to form a turning basin 13 feet deep, 
500 feet wide, and 650 feet long. At request of local 
interests, turning basin was located in south portion of 
estuary downstream from a point 0.25 mile below 
bridge. This change was effected to permit adequate 
terminal facilities to be constructed adjacent to turning 
basin. A map showing this revision is in Portland 
District office. Mean lower low water is plane of 
reference. Range of tide between mean lower low water 
and mean higher high water is 6.7 feet, and extreme 
range of tide from lower low to higher high water is 
estimated to be 14 feet. Federal cost of new work (1970) 
is $3,953,400 exclusive of $635,783 for rehabilitation of 
north jetty. Existing project was authorized by 1954 
River and Harbor Act (S. Doc. 83, 83d Cong., 2d sess., 
contains latest published map). 
Local cooperation. Fully complied with. 
Terminal facilities. One-half mile below 101-Highway 
bridge is a steel sheet piling and fill dock used 
exclusively for shipment of lumber by ocean-going 
barge. There are various other landings for fishing and 
recreational craft. At Wedderburn, across river from 
Gold Beach, is a facility to accommodate excursion 
passengers and small freight items destined for various 
private landings between Wedderburn and Agness, 
Oreg. Facilities considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
U.S. hopper dredge Pacific removed 57,595 cubic yards 
of material from river channel and entrance bar. Other 
maintenance and operation activities carried on. 
Condition at end of fiscal year. Existing project as 
authorized is completed. Construction of two jetties at 
entrance was completed September 1960. Dredging 
river channel by contract and entrance bar by 
government plant was completed October 1961. North 
jetty along channel side suffered considerable damage 
from December 1964 flood and rehabilitation was 
completed October 1966. 
15. SIUSLAW RIVER, OREG. 
Location. Rises in coast range, flows about 110 miles 
westerly and empties into Pacific Ocean about 160 
miles south of entrance of Columbia River and 485 
miles north of San Francisco Bay, Calif. (See Coast and 
Geodetic Survey Charts 6023 and 5802.) 
Previous project. For details see page 1988, Annual 
Report for 1915. 
Existing project. Provides for a 600-foot extension of 
north jetty; and entrance channel 18 feet deep and 300 
feet wide from deep water in ocean to a point 1,500 feet 
inside the outer end of existing north jetty; thence a 
channel 16 feet deep, 200 feet wide with additional 
widening at bends, and about 5 miles long, to a turning 
basin, 16 feet deep, 400 feet wide, and 600 feet long, 
opposite Siuslaw dock at Florence; and a channel 12 
feet deep, 150 feet wide from Florence to Cushman. 
Mean lower low water is plane of reference. Tidal 
range between mean higher high water and plane of 
reference and extreme tidal ranges at mouth of river is 
6.6 feet and about 11 feet, respectively. During low 
stages of river, tidal effect extends to Mapleton, 20 1/2 
miles above mouth. Estimated Federal cost of new work 
(1970) is $3,271,000, exclusive of $879,285 for jetty 
rehabilitation. Funds expended upon completed portion 
of project amount to $380,000. (See table 37-B for 
authorizing legislation.) 
Local cooperation. Fully complied with for all completed 
work. River and Harbor Act of 1958 provides 
that construction of north jetty extension be deferred 
until experience demonstrates, in judgment of Chief of 
1103

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Engineers, that this work is advisable. Real estate 
assurances w ere accepted November 9, 1966. Estimated 
costs for all requirements under terms of 
project authorization were $156,000 (1967). 
Terminal facilities. Port dock at Florence is principal 
terminal facility on river. This dock, 150 feet wide and 
350 feet long, is about 5.3 miles above river entrance 
and accommodates a fish-receiving station at east end 
of wharf which maintains a 2-ton capacity winch and 
supplies gasoline, oil, and ice to fishermen. Other 
facilities at Florence consist of various floatways which 
provide docking facilities for fishing vessels and other 
small craft and a floating dock with accommodations 
for 75 commercial fishing vessels. Adjacent to commercial 
basin is mooring basin with accommodations 
for 200 sport boats of all sizes. Across the river and 
below highway bridge at Glenada are floatways used 
by small craft. Modern docks for loading oceangoing 
barges with packaged lumber are maintained, at 
Cushman, by Murphy Bros. Lumber Co.; between 
Cushman and Mapleton, by Davidson Industries; and 
in Mapleton, by U.S. Plywood Champion Lumber Co. 
There are also a number of private landings and log 
booms between Cushman and Mapleton, to accommodate 
river traffic. These facilities are considered 
adequate for existing traffic. 
Operations and results during fiscalyear. New work: U. S. 
hopper dredge Pactfic removed 125,250 cubic yards of 
material from the 18-foot bar channel. Planting of 
European grass to help stabilize the spoil area was 
completed in February 1970. Maintenance: U. S. 
hopper dredge. Pacific, in conjunction with deepening 
the bar channel, removed 25,200 cubic yards of 
material. 
Condition at end of fiscal year. Extension of jetties 
constructed under previous project was completed in 
1917. The 12-foot channel was completed in 1930. In 
March 1958, rehabilitation of north jetty was accomplished. 
Rehabilitation of south jetty was completed 
December 1962. Modified project, as authorized 
July 3, 1958 and initiated August 1968, is 21 percent 
complete. Remaining work consists of construction of 
pile dikes, and extension of north jetty. Total Federal 
costs for existing project to June 30, 1970 were, $3,385, 
494 of which $993,707 was for new work, $879,285 for 
jetty restoration, and $1,512,503 for maintenance. In 
addition $322,532 was expended for new work from 
contributed funds. 
16. SKIPANON CHANNEL, OREG. 
Location. In tidal waterway extending south 2.7 miles 
from deep water in Columbia River. Channel enters 
Columbia about 10 miles above mouth and 4 miles 
below Astoria, Oreg. (See U.S. Coast And Geodetic 
Survey Chart No. 6152.) 
Existing project. Channel 30 feet deep and generally 
200 feet wide extending from deep water in Columbia 
River to railroad bridge at Warrenton, Oreg., distance 
of 1.8 miles, turning basin of same depth, mooring 
basin 12 feet deep at mean lower low water at 
Warrenton, Oreg., and channel 6 feet deep, generally 
40 feet wide, with increased widths at log dumps and 
terminals, for 4,500 feet via cutoff channel above 
railroad bridge. Mean lower low water is plane of 
reference. Tidal range between mean lower low water 
and mean higher high water is about 8 feet; extreme 
tidal range is about 13 feet. (See table 37-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. City of Warrenton owns wharf with 
a 300-foot frontage open to public on equal terms. One 
privately owned cannery wharf with a 300-foot 
frontage is used for unloading fish and handling fish 
nets. One privately owned boatyard has floats and 
moorage facilities for use of a maximum of 80 small 
boats. In channel above railroad bridge facilities 
consist of log rollways used for sorting logs. Small-boat 
basin has facilities for numerous fishing and recreation 
craft. These facilities, except during the fishing seasons, 
are considered adequate for existing commerce. 
Operations and results during fiscalyear. Maintenance: U. 
S. hopper dredge Pacific removed 2,250 cubic yards of 
material. 
Condition at end of fiscal year. Dredging river channel 
and turning basin was completed in 1939. Construction 
of small-boat mooring basin at Warrenton, Oreg., was 
completed October 1957, and fill stabilization work 
was accomplished in August 1958 completing the 
project. 
17. TILLAMOOK BAY AND BAR, OREG. 
Location. Bay is on Oregon coast about 50 miles south 
of mouth of Columbia River. (See Coast and Geodetic 
Survey Charts 5902 and 6112.) 
Previous project. For details see pages 1989 of Annual 
Report for 1915, and page 1474 of Annual Report for 
1936. 
Existing project. Provides for a jetty about 5,700 feet 
long on north side of entrance and a jetty 8,000 feet 
long on south side; a channel through bar 18 feet deep 
and of such width as can be practically and economically 
obtained; for a channel 200 feet wide and 
18 feet deep from deep water in bay to Miami Cove; 
and for initial dredging to 12 feet deep of a small-boat 
basin and approach thereto at Garibaldi, Oreg. Project 
also provides for improvement of Bayocean Peninsula, 
Oreg.; for navigation, by construction of sand and 
rockfill dike 1.4 miles long, on alinement extending 
between Pitcher Point and town of Bayocean. Mean 
lower low water is plane of reference. Tidal range 
between mean higher high water and plane of 
reference and extreme tidal range at entrance are 7.5 
feet and about 13.5 feet, respectively. Estimated 
Federal cost of new work (1970) is $13,330,000 
exclusive of $2,748,000 for jetty rehabilitation. Hobsonville 
Channel portion of project is inactive and 
1104

PORTLAND, OREG., DISTRICT 
excluded from foregoing cost. Estimated cost (1955) of 
this portion is $99,000. (See table 37-B for authorizing 
legislation.) 
Local cooperation. Complied with for all work. River 
and Harbor Act of 1965 requires local interests provide 
lands, easements, and rights-of-way for construction 
and future maintenance and aids to navigation upon 
request of the Chief of Engineers, including suitable 
spoil-disposal areas, and necessary retaining dikes, 
bulkheads, and embankments therefor or the costs of 
such retaining works; hold United States free from 
damages; provide and maintain adequate public 
terminal and transfer facilities open to all equally; and 
provide and maintain depths in berthing areas and 
local access channels serving the terminals, including 
the 50-foot strip adjacent to pierhead lines, commensurate 
with depths provided in related project 
areas. Assurances and rights-of-way for construction of 
south jetty received Dec. 6, 1967. 
Terminal facilities. At Garibalidi: A privately owned 
facility for shipping lumber and receiving logs, a public 
landing suitable for mooring fishing vessels, towboats, 
and other craft. Small-boat basin has adequate 
facilities for mooring fishing and recreational craft. At 
Bay City: A privately owned wharf used exclusively for 
receipt of fresh fish and shellfish. Near city of 
Tillamook: Several log rollways. Facilities considered 
adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Construction of south jetty, initiated April 21, 1969, 
was 44 percent completed. Rehabilitation: Payment 
was made on pending claim. Maintenance: Condition 
surveys and studies are under way. 
Condition at end of fiscal year. Under existing project 
except for construction of Hobsonville Channel portion, 
classified inactive, channels were completed in 
1927, north jetty in 1933, improvement of Bayocean 
Peninsula in 1956, and small-boat basin in 1958. 
Rehabilitation of north jetty was accomplished September 
1965. Construction of south jetty, initiated 
April 1969, is under way. Total Federal costs of existing 
project to June 30, 1970, were $7,908,524 of which $3, 
736,011 was for new work, $2,839,799 for jetty 
restoration, and $1,332,714 for maintenance. In addition, 
$592,622 expended was for new work and $6, 
450 for maintenance from contributed funds. 
18. UMPQUA RIVER, OREG. 
Location. Rises in Cascade Range, flows westerly 
about 120 miles, and empties into Pacific Ocean 180 
miles south of Columbia River and 465 miles north of 
San Francisco Bay. (See Coast and Geodetic Survey 
Charts 5802 and 6004.) 
Previous projects. For details see page 2967 of Annual 
Report for 1898, and page 1732 of Annual Report for 
1938. 
Existing project. Ajetty on north side of entrance about 
8,000 feet long, westerly from highwater line to the sea; 
a south jetty 4,200 fe et long extending to a point 1,800 
feet south of outer end of north jetty; dredging to 
provide a usable entrance channel 26 feet deep, and a 
river channel 22 feet deep and 200 feet wide, from 
mouth to Reedsport, a distance of about 11 miles, with 
a turning basin at Reedsport 1,000 feet long, 600 feet 
wide, and 22 feet deep; a channel 12 feet deep and 100 
feet wide from deep water in the river to vicinity of 
docks in Winchester Bay with a mooring and turning 
basin 12 feet deep, 175 feet wide, and 300 feet long at 
inner end; and a channel 22 feet deep and 200 feet 
wide from main river channel near mile 8 to Gardiner, 
Oreg., and a turning basin of same depth, 500 feet 
wide, and 800 feet long, opposite Gardiner. Project was 
modified in 1954 to provide a channel in Scholfield 
River, 12 feet deep at mean lower low water generally 
100 feet wide from its confluence with Umpqua River 
to a point 0.5 mile below first railroad bridge, a 
distance of 2 miles, entrance to be widened to 300 feet 
in 500 feet. Mean lower low water is plane of reference. 
Tidal range between mean lower low water and mean 
higher high water at river mouth is 6.9 feet, and 
extreme range is about 11 feet. Federal cost of new 
work is $2,664,635, exclusive of $2,500,677 for jetty 
rehabilitation. Scholfield River channel portion of 
project is classified inactive and excluded from foregoing 
cost estimate. Estimated cost of this portion 
(1957), $54,000. (See table 37-B for authorizing 
legislation.) 
Local cooperation. Complied with for all work except 
Scholfield River channel modification. River and 
Harbor Act of 1954 provides in connection with 
construction of Scholfield River channel, that local 
interests contribute in cash $10,000 toward cost of new 
work; furnish suitable spoil-disposal areas for initial 
work and future maintenance; and hold the United 
States free from damages. Submission of assurances was 
requested of Port of Umpqua, July 3, 1956. On April 8, 
1957, local interests report inability to furnish required 
cooperation. 
Terminal facilities. At Gardiner there is about 650 feet 
of wharf frontage of which 60 feet is publicly owned. At 
river mile 8.6, Gardiner, there is an oil unloading 
facility owned by International Paper Co. for exclusive 
use of tanker barges. At Reedsport there is a privately 
owned mill dock for shipment of lumber, and a dock for 
receipt and shipment of river-run sand and gravel. Port 
of Umpqua owns one wharf with 456 feet of water 
frontage, of which 228 feet is usable for vessels and 
another with about 75 feet of water frontage which has 
not been used generally for commercial shipping. On 
Bolon Island across the river from Reedsport a wharf 
was constructed which has about 5 acres of open 
storage for lumber and available to all on equal terms. 
At Winchester Bay, 2 miles from river entrance, there is 
a public-landing float with a wooden pile and timber 
shore approach, and a privately owned wharf used by 
excursion and commercial fishing vessels. Facilities are 
considered adequate for existing commerce. 
1105

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Operations and results during fiscalyear. Maintenance: U. 
S. hopper dredge Pacific removed 80,200 cubic yards of 
material from the entrance channel. 
Condition at end of fiscal year. Existing project is 
complete. North jetty was completed in 1940. Extension 
to original south jetty was completed in 1938 
and construction on a new training jetty on south side 
of entrance to replace original south jetty which was 
partially destroyed by storms was completed in 1951. 
Dredging a 22-foot channel from mouth of river to 
Reedsport was completed in 1941. Gardiner Channel 
and turning basin was completed in 1949 and 
Winchester Bay channel and mooring basin in 1956. 
Remaining under authorization is construction of 12- 
foot channel in Scholfield River, currently classified 
inactive and south jetty wave gage surveillance. 
Rehabilitation of South jetty was completed August 
1963. Total Federal costs for existing project, June 30, 
1970 were $11,022,790 of which $2,664,635 was for new 
work, $2,500,677 for jetty restoration, and $5,857,478 
for maintenance. In addition, $276,500 was expended 
for new work from contributed funds. 
19. WILLAMETTE RIVER ABOVE 
PORTLAND AND YAMHILL RIVER, 
OREG. 
Location. Willamette River rises in Cascade Range in 
southwestern Oregon, flows northerly, and empties into 
Columbia River about 100 miles from the sea. Its 
length from source of Middle Fork is about 294 miles. 
(See Coast and Geodetic Survey Chart 6155 and 
Geological Survey map, State of Oregon.) Yamhill 
River rises in Coast Range, flows easterly, and empties 
into Willamette River about 42 miles above Portland. 
Its length from source of South Fork is about 52 miles. 
Previous projects. For details see page 1997 of Annual 
Report for 1915, and page 1754 of Annual Report for 
1938. 
Existing project. Provides for improvement of Willamette 
River between Portland (mile 14) and Oregon 
City (mile 26) by a channel 8 feet deep at low water, 
200 feet wide below Cedar Island and 150 feet wide 
thence to Oregon City; such channel improvement and 
contraction works as may be necessary to secure with 
streamflow regulation, controlling depths of 6 feet at 
low water and of no prescribed width, from Oregon 
City to mouth of Santiam River (mile 108.5), 5 feet 
from that point to Albany (mile 120), 2.5 to 3.5 feet 
deep from Albany to Corvallis (mile 132), and for 
necessary snagging between Corvallis and Eugene 
(mile 185). Project also provides for a channel in 
Yamhill River 4 feet deep at low water and 60 feet wide 
from its mouth to McMinnville (18 miles) secured by 
means of a lock and dam near Lafayette and by 
removal of obstructions. Section of Willamette River in 
vicinity of Willamette Falls at Oregon City is covered 
by Improvement No. 20. For Willamette River below 
falls at Oregon City ordinary fluctuation of stage of 
water is 15 feet and extreme fluctuation due to flood 
conditions 35 to 50 feet. Above Oregon City ordinary 
fluctuation is 12 to 20 feet and extreme is 20 to 27 feet. 
For Yamhill River ordinary fluctuation is 35 feet and 
extreme 48 feet. Tidal changes vary from about 2 1/2 
feet at mouth of Willamette to zero, 26 miles above 
mouth. Estimated cost of new work (1970) is $4,310, 
000. (See table 37-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. Between Ross Island Bridge at 
Portland and Willamette Falls at Oregon City: 
Privately owned mill docks, sand and gravel wharves, a 
cement loading facility, a small shipyard, and oilreceiving 
stations. Above the falls there are privately 
owned landings including a facility at Pulp Siding (3 
miles above the falls) with rail and water connections 
for shipment of clay and receiit of papermill products 
by barge. At Wilsonville and Newberg there are sand 
and gravel facilities. At Salem there is a 420,000 gallon 
fuel tank which is serviced by tanker barges. At 
numerous locations as far as Corvallis (river mile 132) 
there are log rollways with water and rail or truck 
connections, to facilitate moving logs to mills in lower 
Willamette and Columbia Rivers. At Oswego there is a 
dock for the receipt of limerock used in the manufacture 
of cement. Facilities considered adequate for 
existing commerce. 
Operations and results during fiscalyear. Maintenance: A 
total of 428,841 cubic yards of material was removed by 
the U. S. dredge Luckiamute A claim settlement was 
effected in February 1970. Releases of stored water 
from Fern Ridge, Cottage Grove, Dorena, Detroit, 
Lookout Point, Hills Creek, Cougar, Fall 
Creek, Green Peter, and Blue River Lakes aided 
materially during low water periods in providing 
sufficient depths for existing traffic. For information 
on reservoir release see reports covering these 
reservoirs under flood control and multiple 
purpose projects. 
Condition at end of fiscal year. Existing project is about 
14 percent complete. The 8-foot channel between 
Portland and Oregon City and 2.5- to 3.5-foot channel 
between Oregon City and Albany were completed in 
1939. The 2.5- to 3.5-foot channel between Albany and 
Corvallis was completed in 1945. Remaining work 
required to complete project consists of construction of 
such contraction works and channel improvements as 
may be necessary, with streamflow regulation, to secure 
controlling depths of 6 feet at low water from Oregon 
City to mouth of Santiam River, and 5 feet from that 
point to Albany. Due to lack of use by commercial 
traffic for which facilities were provided, operation of 
Yamhill lock was discontinued February 7, 1954, and 
the lock and adjacent property reported surplus and 
turned over to Yamhill County January 16, 1959. 
Total Federal costs of existing project, were $15,614, 
869 of which $615,170 was for new work, and $14,999, 
699 for maintenance. In addition $106,433 expended 
1106

PORTLAND, OREG., DISTRICT 
between September 24, 1900, and June 30, 1935, on 
operating and care of improvement under provisions of 
permanent indefinite appropriations for such purposes. 
Additional $7,500 expended from contributed funds for 
maintenance and $299,900 emergency relief administration 
funds for new work. 
20. WILLAMETTE RIVER AT 
WILLAMETTE FALLS, OREG. 
Location. Locks and dam covered by this project are 
at Willamette Falls, a rocky reef in Willamette River at 
Oregon City, Oreg., about 26 miles above mouth of 
river. 
Existing project. Provides for construction of a new 
single-lift main lock and a guard lock each with clear 
dimensions of 56 by 400 feet and a minimum depth 
over sills of 9 1/2 feet, to replace existing facilities which 
were provided for by purchase, rehabilitation, and 
deepening to 6 feet at low water of existing canal and 
locks and separation of canal from waterpower intake 
by construction of a concrete division wall. Total 
length of existing canals and locks is about 3,500 feet. 
Principal features of existing canal and locks at 
Willamette Falls are set forth in table 37-D. 
Ordinary fluctuation of stage of water above locks is 
12 feet and extreme, due to flood conditions, 20 feet. 
Below locks, ordinary fluctuation is 15 feet and extreme 
50 feet. Estimated Federal cost (1970) is $17,300,000. 
(See table 37-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Crown Zellerbach Corp. has a 
timber wharf about 850 feet long, extending to and 
supported by concrete division wall built in lock canal 
by United States. This wharf is used for receiving mill 
supplies and shipping paper and paper products. 
Operations and results during fiscal year. Maintenance: 
Contracts completed were; construction of guide wall, 
replacement of lock gate No. 1 and removal of two 
large rock blocks. Contract for replacement of lock gate 
No. 2 and No. 4 was underway. 
Condition at end of fiscal year. Existing canal and locks 
originally constructed by private interests in 1873 were 
purchased by the United States in April 1915 for $375, 
000. Final report on purchase and rehabilitation of 
canal and locks is in Annual Report for 1923, when 
project was reported 98 percent complete. Replacement 
of gates Nos. 6 and 7 were completed August 
1967 under minor rehabilitation funds. Existing locks 
and grounds are in fair condition and in continuous 
operation except when flooded out by high water or 
undergoing repair. Facilities are obsolete and inadequate 
for existing traffic. No construction work has 
been done on lock and guard lock, which was 
authorized to replace existing facilities by Flood 
Control Act of 1939, and River and Harbor Act of 
1945. 
21. YAQUINA BAY AND HARBOR, OREG. 
Location. Bay is on Oregon coast, 113 miles south of 
mouth of Columbia River. (See Coast and Geodetic 
Survey Charts 5802 and 6058.) 
Previous projects. For de tails see Annual Report for 
1893, part 4, page 3314, and Annual Report for 1938, 
page 1736. 
Existing project. Two high tide rubblemound jetties at 
entrance, north jetty 6,500 feet, and south jetty 7,600 
feet long; a spur jetty on channel side of south jetty 4, 
700 feet from its sea end, 800 feet long; five groins 
channelward from south jetty; channel 40 feet deep for 
a general width of 400 feet across bar and at outer end 
of entrance channel; a channel 30 feet deep and Inc., 
has two berths capable of serving ocean-going vessels, 
one wide and 1,400 feet long, and a channel 18 feet 
deep and 200 feet wide from 30-foot channel at about 
mile 1, along city docks at Newport, thence upstream to 
abandoned railroad terminus at Yaquina, a distance of 
about 4 1/2 miles. Project also provides for a small-boat 
mooring basin at Newport, Oreg. Mean lower low 
water is plane of reference. Tidal range between mean 
higher high water and plane of reference and extreme 
tidal range are 8.1 and 11.5 feet, respectively. Estimated 
Federal cost of new work (1970) is $20,600,000. 
(See table 37-B for authorizing legislation.) 
Local cooperation. Fully complied with for all completed 
work. River and Harbor Act of July 3, 1958, 
provides that south jetty shall not be extended until 
experience demonstrates, in judgment of Chief of 
Engineers, that this work is advisable. Total estimated 
costs for all requirements under terms of 1958 project 
modification were $46,000 (1969). 
Terminal facilities. At McLean Point, on north side of 
bay, about 2 miles from entrance, Yaquina Bay Dock 
& Dredge Co., Inc., has two berths capable of serving 
ocean-going vessels, one 420 feet long, the second 450 
feet long. At the time the second berth was dredged, a 
retaining wall and fill of 6 acres was constructed 
adjacent to deep water. The company now has 17 acres 
of filled land adjacent to deep water, and of this total, 7 
acres was constructed in 1956-57. This facility has 
necessary carriers and lift trucks for handling lumber 
cargoes, and is open to all on equal terms. Port of 
Newport has a public wharf with 300 feet of frontage 
for servicing fishing boats. In addition, Port of Newport 
maintains 340 berths for mooring commercial and 
sport fishing vessels. There are several seafood companies 
on the bay which have their own facilities for 
handling fresh fish and crab. Supplies and petroleum 
products are readily available for small vessels. On 
south side of bay about 1 1/2 miles above entrance, 
Newport Dock Co. maintains a wharf, bulkhead, and 
dolphins for loading ocean-going lumber barges. These 
facilities are considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Preconstruction conference held June 19, 1970 on 
1107

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
contract to extend south jetty. Contractor scheduled to 
start barging and stockpiling at jetty site in November 
1970. Maintenance: U. S. hopper dredge Pacific and 
Harding worked at various times throughout the season 
removing a total of 638,065 cubic yards of material. 
Condition at end of fiscal year. Existing project as 
originally authorized was completed in May 1952. 
Restoration of jetties was completed in 1934 and 
extension of north jetty 1000 feet seaward was 
completed in 1940. Construction of mooring basin at 
Newport and dredging of channel and turning basin to 
project dimensions were completed during fiscal year 
1949. Restoration of north jetty was again accomplished 
in 1956. Repair and extension of north 
jetty was completed September 1966. Construction 
under modifications of July 3, 1958 was 56 percent 
complete. Dredging of 40-foot bar channel and 30-foot 
river channel was completed October 1968. Construction 
contract for extension of south jetty was 
awarded May 26, 1970. Total Federal costs for existing 
project were $17,765,117 of which $12,742,743 was for 
new work, $12,005 for rehabilitation, and $5,010,369 
for maintenance. In addition $729,168 of contributed 
funds was expended for new work. 
22. YAQUINA RIVER, OREG. 
Location. Rises in Coast Range, flows about 50 miles 
in a westerly direction, and empties into Yaquina Bay, 
on Oregon Coast. (See U.S. Coast and Geodetic Survey 
Charts Nos. 5802 and 6058.) 
Existing project. Provides for two controlling half-tide 
dikes of piling, brush, and stone, each about 1,100 feet 
long (constructed by local interests), and for a channel 
10 feet deep and generally 150 feet wide on Yaquina 
River and 200 feet wide in Depoe Creek, extending 
from town of Yaquina to Toledo, about 9 miles. 
Detailed project report, covering modification of 
project under Section 107 of 1960 River and Harbor 
Act providing for a channel 10 feet deep and 150 feet 
wide from Depoe Creek (mile 13.0) to mile 14.4, 
including a turning basin 10 feet deep, 350 feet wide 
and 500 feet long was approved March 1, 1966 
authorizing project for construction. 
Mean lower low water is plane of reference. Mean 
higher high water above plane of reference and 
extreme tidal ranges under ordinary conditions at 
mouth of river are 8.1 feet and about 12 feet, and same 
at Toledo. Freshet heights are about 12 feet at mouth of 
Depoe Creek. Estimated Federal cost of new work is 
$234,900. Existing project was authorized by River and 
Harbor Act of MIarch 4, 1913 (H. Doc. 519, 62d Cong., 
2d sess., which contains latest published map). 
Local cooperation. Fully complied with. 
Terminal facilities. Near town of Yaquina at river 
mouth, which is also head of Yaquina Bay, there is a 
moorage for small vessels and a small-craft shipyard. 
Both port and city of Toledo have public-terminal 
facilities for accommodation of local craft. There are 
also privately owned facilities for loading lumber 
barges, receipt of bunker fuel oil, and log rollways for 
receipt of logs. These facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Settlement of contract dredging claim being processed. 
Condition at end of fiscal year. Construction of channel 
work authorized March 1913 was completed in 1914. 
Project as modified under Section 107 of the 1960 
River and Harbor Act and approved March 1, 1966, 
was completed July 1968. 
23. RECONNAISSANCE AND CONDITION 
SURVEYS 
See table 37-F. 
24. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 37-E. 
25. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to section 107, Public Law 86- 
645 (preauthorization) 
See table 37-G. 
Snagging and clearing for navigation (Sec. 3 of 1945 River 
and Harbor Act, Public Law 14, 79th Cong.). 
For work at Rogue River, Oregon, $30,496 was 
expended during fiscal year. 
ALTERATION OF BRIDGES. 
26. OTHER AUTHORIZED BRIDGE 
ALTERATIONS. 
See table 37-H.
FLOOD CONTROL 
27. APPLEGATE LAKE, ROGUE RIVER 
BASIN, OREG. 
Location. In Jackson County, Oreg., on Upper 
Applegate River, a tributary of Rogue River, at river 
mile 45.7, about 23 airline miles southwest of Medford, 
Oreg. 
Existing project. Plan provides for a rockfill embankment 
dam, 232 feet high from lowest point of the 
general foundation to crest with an overall length of 1, 
200 feet. A gate-controlled concrete chute-type spillway, 
regulating outlet tunnel, and intake tower with 
multilevel intakes will be on right abutment. Lake, 4.6 
miles long will provide 75,000 acre-feet of usable 
storage for flood control and water conservation 
utilization. Project will control runoff from a drainage 
area of 223 square miles. In addition to flood control, 
reservoir will be operated to provide irrigation, fish and 
wildlife enhancement, water quality control, and 
recreation benefits. Project was authorized by 1962 
1108

PORTLAND, OREG., DISTRICT 
Flood Control Act (H. Doc. 566, 87th Cong., 2d sess.). 
Estimated cost of project (1970) is $31,000,000 of which 
$8,212,000 is for lands and damages including relocations, 
and $22,788,000 for construction. Excluded 
from the estimate of $31,000,000 is $4,280,000 for 
recreation facilities which will be funded and developed 
by the U. S. Forest Service. 
Local cooperation. Authorizing act requires that State 
of Oregon take action, prior to construction, to insure 
maintenance in stream of flow to be released for fishery. 
In addition, costs allocated to irrigation would have to 
be repaid in a manner and to an extent consistent with 
Reclamation laws and policies. Oregon State Game 
Commission and Fish Commission of Oregon made 
filing May 31, 1962 with State Eng ineer for water 
rights for use of stored water and natural flows for fish 
habitat improvement in amounts and at times specified 
in project authorization. U.S. Bureau of Reclamation 
is currently making a feasibility study of Applegate 
Irrigation Division. 
Operations and results during fiscal year. Design Memorandum 
No. 7, for clearing, was approved July 30, 
1969. Spillway, outlet works and fish facilities design 
memorandum being prepared by Seattle District. 
Plans and specifications for Lower Applegate Road 
and detour were 58 percent completed. 
Condition at end of fiscal year. Preconstruction engineering 
and studies continue. Design memorandums 
approved are: site selection, hydrology and meteorology, 
relocations, general, real estate, land requirements 
plan-public use, Lower Applegate Road 
and detour, and clearing. Preparation of plans and 
specifications for initial road relocation contract is 
underway. 
28. BLUE RIVER LAKE, OREG. 
Location. On Blue River, a major tributary of 
McKenzie River, 1.7 miles above confluence of the two 
streams at the confluence of Quartz Creek and Blue 
River and about 38 miles easterly of Eugene, Oreg. 
Existing project. A gravel-fill embankment dam 1,329 
feet long at crest including spillway and 319 feet above 
the lowest point of the general foundation. A concrete 
gravity chute-type spillway with two gates is located on 
left abutment. Outlet works are in left abutment. On 
left shore of reservoir an earth-and-gravel fill embankment, 
about 1,535 feet long and 122 feet high, 
closes a low saddle between Blue River and McKenzie 
River. Project controls runoff from drainage area of 88 
square miles. Reservoir provides 85,000 acre-feet of 
usable flood control storage and is operated as a unit of 
coordinated reservoir system to protect Willamette 
River Valley and increase low waterflows for navigation 
and other purposes. Blue River Lake is one of 
two projects authorized by 1950 Flood Control Act to 
be constructed in lieu of Quartz Creek Lake, authorized 
by 1938 Flood Control Act. Estimated cost of 
project (1970) is $30,100,000 of which $4,552,000 is for 
lands and damages including relocations, and $25,548, 
000 for construction. 
Local cooperation. None required. 
Operations and results during fiscal year. New Work: 
Computations of pay quantities and negotiation on 
claims for main dam were being conducted. Minor 
contracts completed were debris cleanup, and site 
cleanup, paving, fencing and viewpoint shelter. Preparation 
of plans and specifications for cleanup of lake 
bottom continues. Maintenance: Design memorandum 
for public use plan was being prepared. Normal 
operation and maintenance work performed. Freshets 
regulated by Blue River Lake project on Blue River, a 
major tributary of McKenzie River, are shown in table 
37-I. 
Condition at end of fiscal year. Project is complete, except 
for minor items. Construction of dam and appurtenant 
works was initiated in May 1963 and placed in useful 
operation October 1968. Determination of final pay 
quantities and settlements of claims are under way. 
29. CASCADIA LAKE, OREG. 
Location. In Linn County, Oreg., at river mile 48.3 on 
South Santiam River, about 38 miles southeast of 
Albany, Oreg. 
Existing project. Plan provides for a rockfill embankment 
dam, 267 feet high from lowest point of the 
general foundation and 1,170 feet long. A gatecontrolled 
concrete chute-type spillway and regulating 
outlet works will be on right abutment. Reservoir will 
provide 145,000 acre-feet of usable flood control 
storage and will control 193 square miles of drainage 
area. Project was authorized by 1962 Flood Control 
Act (H. Doc. 403, 87th Cong., 2d sess.) to be 
constructed in lieu of Sweet Home Lake, Oreg., 
authorized by Flood Control Act of 1938. Estimated 
cost of project (1970) is $54,800,000. 
Local cooperation. None required. 
Operations and results during fiscal year. An alternate 
dam site was selected as the result of a public hearing 
held September 18,1969. Supplement to site selection 
design memorandum was forwarded to OCE March 3, 
1970. Hydrology and meteorology design memorandum 
will be revised to meet requirements of 
alternate site. Other design memorandums being 
prepared were: general, including foundation and 
material appendix; relocations; and land requirements 
plan-public use. 
Condition at end of fiscal year. Under advance engineering, 
preparation of design memorandums is in 
progress. The decision to relocate dam site necessitated 
a supplement to the approved site selection design 
memorandum, and pending revisions to approved 
hydrology and meteorology design memorandum. 
1109

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
30. COTTAGE GROVE LAKE, OREG. 
Location. On Coast Fork of Willamette River, 29 
miles from mouth. Coast Fork rises in Douglas County, 
Oreg., on western slope of Cascade Range and 
northern slope of Calapooya Range, flows north for 49 
miles, and unites with Middle Fork to form main 
Willamette River. 
Existing project. An' earthfill dam, 1,750 feet long at 
crest, 114 feet high from lowest point of the general 
foundation, a concrete gravity free overflow spillway 
264 feet long near the right abutment, and a concrete 
gravity non-overflow section 96 feet long forming the 
right abutment. Total length of dam is 2,110 feet. 
Outlet works, consisting of three gate-controlled 
conduits, pass through spillway section. Reservoir 
provides 30,060 acre-feet of usable flood control storage 
and controls runoff of drainage area of 104 square 
miles. Project is operated as a unit of coordinated 
reservoir system to protect Willamette River Valley 
and increase low waterflow for navigation and other 
purposes. Existing project was selected for construction 
under general authorization for Willamette River 
Basin in Flood Control Act of 1938. Flood Control Acts 
of December 22, 1944, July 24, 1946, and September 3, 
1954, modified project for recreation facilities. Estimated 
total Federal cost of project (1970) is $3,326, 
000 of'which estimated Federal cost of construction for 
additional recreation facilities at completed project is 
$953,000 (1970). 
Local cooperation. Estimated costs of local cooperation 
on basis of cost-sharing for recreation facilities is $185, 
000
Operations and results during fiscal year. New Work: 
Preparation of plans and specifications for additional 
recreation facilities was in progress. Maintenance: 
Project was in operation with ordinary maintenance 
accomplished as required. Freshets regulated by 
Cottage Grove Lake on Coast Fork Willamette River 
are shown in table 37-I 
Condition at end of fiscal year. Construction of project 
initiated August 1940 was completed April 1952 except 
for construction of additional recreation facilities. Dam 
and reservoir have been in continuous operation since 
September 1942. Planning for additional recreation 
facilities is under way. 
31. COWLITZ COUNTY CONSOLIDATED 
DIKING IMPROVEMENT DISTRICT 
NO. 2, WASH. 
Location. In southwest corner of Cowlitz County, 
Wash., at confluence of Lewis River with Columbia 
River and extends downstream along Columbia River 
between miles 80.5 and 86.5. 
Existing project. Provides for raising and strengthening 
existing levees and construction of new leveesadjacent 
to town of Woodland to provide added protection. 
Existing project was authorized by 1950 Flood Control 
Act (H. Doc. 541, 81st Cong., 2d sess.). Estimated 
Federal cost (1970) is $1,503,000. 
Local cooperation. Flood Control Act of 1950 provides 
local interests furnish lands and rights-of-way; make 
necessary highway, highway bridge, and utility alterations; 
hold the United States free from damages; 
and maintain and operate completed works. Estimated 
costs of all requirements of local cooperation under 
terms of project authorization were $85,000 (1970). 
Operations and results during fiscal year. New Work: 
Contract to design, manufacture, test and deliver 
pumps, motors and motor controls was completed 
February 1970. Replacement of pumping stations and 
tidebox, under contract awarded October 1968, was 
completed November 14, 1969. Contract for construction 
of flood wall and gatewell structures was 
awarded June 15,1970. Work scheduled to start in July 
1970. 
Condition at end of fiscal year. Construction on existing 
project begun September 1967 is 80 percent complete. 
Scheduled completion is January 1971. 
32. DORENA LAKE, OREG. 
Location. On Row River, Oreg., 7 miles from mouth. 
Row River rises in Lane County on western slope of 
Cascade Range, flows northwest for 19 miles, and 
enters Coast Fork of Willamette River 19 1/2 miles 
above mouth. 
Existing project. An earthfill embankment dam, 3,352 
feet long at crest and 145 feet high from lowest point of 
the general foundation. Concrete gravity free-overflow 
spillway, 200 feet long, forms right abutment. Outlet 
works of five slide-gate-controlled conduits pass 
through spillway section. Reservoir provides 70,500 
acre-feet of usable flood control storage and controls 
runoff of 265 square miles, practically entire drainage 
area tributary to Row River. Project is operated as a 
unit of coordinated reservoir system to protect Willamette 
River Valley and increase low waterflows for 
navigation and other purposes. Existing project was 
selected for construction under general authorization 
for Willamette River Basin in Flood Control Act of 
1938. Flood Control Acts of 1944, 1946, and 1954 
modified project for recreation facilities. Estimated 
total Federal cost of project (1970) is $14,649,500, of 
which Federal construction cost of additional recreation 
facilities at completed project is estimated at 
$1,120,000 (1970). 
Local cooperation. Estimated costs of local cooperation 
on basis of cost-sharing for recreation facilities is $551, 
000. 
Operations and results during fiscal year. New work: 
Construction of recreation facilities at Baker Bay was 
completed October 11, 1969. Preparation of plans and 
specifications for sewerage revision at Baker Bay Park 
was 98 percent completed. Maintanance: Project was 
in operation with ordinary maintenance accomplished 
as required. Freshets regulated by Dorena Lake project 
1110

PORTLAND, OREG., DISTRICT 
on Row and Coast Fork Willamette River are shown in 
table 37-I. 
Condition at end of fiscal year. Construction of project 
initiated June 1941 was completed October 1952 
except for construction of additional recreation facilities 
authorized in 1954. Dam and reservoir have 
been in continuous operation since November 1949. 
33. ELK CREEK LAKE, ROGUE RIVER 
BASIN, OREG. 
Location. In Jackson County, Oreg., at river mile 1.7 
on Elk Creek, a tributary of Rogue River, about 26.5 
miles northerly from Medford, Oreg. 
Existing project. Plan provides for a rock and gravel 
embankment dam, 233 feet high from lowest point of 
the general foundation to crest with an overall length of 
2,685 feet. A gate-controlled concrete chute-type 
spillway, regulating outlet tunnel and intake tower 
with multilevel intakes will be in right abutment. 
Reservoir 6.2 miles long will provide 95,000 acre-feet of 
usable storage for flood control and water conservation 
utilization. Project will control runoff from a drainage 
area of 127 square miles. Reservoir will be operated to 
provide future municipal and industrial water supply, 
irrigation, fish and wildlife enhancement water quality 
control, and recreation benefits. Project was authorized 
by 1962 Flood Control Act (H. Doc. 566, 87th Cong., 
2d sess.). Estimated Federal cost of project (1970) is 
$29,000,000 of which $4,839,000 is for lands and 
damages including relocations and $24,161,000 for 
construction. 
Local cooperation. Authorizing act requires that State 
of Oregon take action, prior to construction, to insure 
maintenance in stream of flow to be released for fishery. 
In addition, costs allocated to irrigation would have to 
be repaid in a manner and to an extent consistent with 
Reclamation laws and policies. On February 24, 1966 
State of Oregon Water Resource Board filed for 
withdrawal rights of 25 c.f.s. to maintain minimum 
flow for fish. U.S. Bureau of Reclamation has completed 
feasibility study for irrigation of Medford 
Division from Lost Creek and Elk Creek Lakes, and 
will determine repayment requirements by local 
interests. 
Operations and results during fiscal year. Design memorandums 
approved were: general, including foundations 
and materials appendix No. 3, July 17, 1969; 
land requirements plan-public use, August 20, 1969; 
and real estate No. 6, August 29, 1969. Preparation of 
design memorandums continued covering lower county, 
BLM and detour road; clearing; and public use 
plan. 
Condition at end offiscalyear. Design memorandums for 
site selection; hydrology and meteorology; relocation; 
general, including foundations and materials; land 
requirements plan-public use; and real estate are 
approved. Further preparation of design memorandums, 
under advance engineering, is in progress. 
34. FALL CREEK LAKE, OREG. 
Location. On Fall Creek, a tributary of Middle Fork 
Willamette River, about 7 miles above confluence of 
the streams and about 19 miles southeasterly of 
Eugene, Oreg. 
Existing project. An earth-and-gravel fill embankment 
about 5,100 feet long at crest and 193 feet high from 
lowest point of the general foundation. A gated 
concrete gravity spillway is in left abutment. Outlet is 
near right abutment. Reservoir provides 115,000 acrefeet 
of usable flood control storage and is operated as a 
unit of coordinated reservoir system to protect Willamette 
River Valley and increase low waterflows for 
navigation and other purposes. Project was authorized 
by 1950 Flood Control Act (H. Doc. 531, 81st Cong., 2d 
sess.). Flood Control Acts of 1944, 1946, and 1954 
modified project for recreation facilities. Estimated 
total Federal cost of project (1970) is $21,799,000 of 
which $4,862,000 is for lands and damages including 
relocations and $16,937,000 for construction, which 
includes an estimated $707,000 (1970) for additional 
recreation facilities at completed project. 
Local cooperation. Estimated costs of local cooperation 
on basis of cost-sharing for recreation facilities is $707, 
000. 
Operations and results during fiscal year. New work: 
Preparation of plans and specifications for regulating 
outlet stilling basin modification, a minor completion 
item, was 95 percent completed. Award scheduled for 
August 1970. Planning for additional recreation 
facilities continued. Maintenance: Normal operation 
and maintenance features carried on. Freshets regulated 
by Fall Creek Lake project on Fall Creek, a 
tributary of Middle Fork Willamette River are shown 
in table 37-I. 
Condition at end of fiscal year. Construction of project 
began May 1962 and was essentially completed 
November 1965 except for minor completion items. 
Reservoir storage for flood control was initiated 
October 1965. 
35. FERN RIDGE LAKE, OREG. 
Location. On Long Tom River, 23.6 miles from the 
mouth. Long Tom River rises in Lane County, Oreg., 
on eastern slope of Coast Range, flows north for 50 
miles, and enters Willamette River 147 miles above its 
mouth. 
Existing project. A main dam, 6,624 feet long at crest 
and 49 feet high from lowest point of the general 
foundation and two auxiliary dikes, 915 and 3,929 feet 
long, along northeasterly boundary of lake. Main dam 
consists of an earthfill embankment dam, 6,330 feet 
long and a concrete gravity spillway near left abutment 
with a non-overflow structure, 46 feet long, containing 
outlet works, and an overflow structure, 248 feet long, 
controlled by six automatic gates. Project includes 
rectification of channel of Long Tom River down- 
1111

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
stream of dam. Reservoir provides 110,000 acre-feet of 
usable flood control storage and controls runoff of 
tributary drainage area of 275 square miles. Reservoir 
protects Long Tom River Valley and is operated as a 
unit of coordinated reservoir system to protect Willamette 
River Valley generally and to increase low 
waterflows for navigation and other purposes. Existing 
project was selected for construction under general 
authorization for Willamette River Basin in Flood 
Control Act of 1938. Dam was originally constructed in 
11941 to height of 47 feet. Provision of additional 
storage for flood control was authorized by Flood 
Control Act of 1962 and was obtained in 1965 by 
raising embankments 2 feet to 49 feet above lowest 
point of the general foundation. Flood Control Acts of 
1944, 1946, and 1954 modified project to provide for 
recreation facilities. Estimated Federal cost of project 
(1970) is $8,962,000 including $136,482 cost of raising 
dam. Federal cost of construction of recreation facilities 
at completed project is estimated at $4,330,000 (1970). 
Local cooperation. Estimated costs of local cooperation 
on basis of cost-sharing for recreation facilities is $952, 
000. 
Operations and results during fiscal year. New work: Real 
estate activities and engineering studies for additional 
recreation facilities continued. Maintenance: In addition 
to ordinary operation of dam and reservoir a 
contract was completed August 1969 for bank protection 
work along the Long Tom River. Freshets 
regulated by Fern Ridge Lake project on Long Tom 
River are shown in table 37-I. 
Condition at end of fiscal year. Construction of project 
initiated April 1940 was completed August 1951, 
except for construction of additional recreation facilities 
authorized in 1954 and provision of additional 
storage for flood control authorized in 1962 and 
completed April 1965. Dam and reservoir have been in 
continuous operation since December 1941. 
36. GATE CREEK LAKE, OREG. 
Location. In Lane County, Oreg., at river mile 0.4 on 
Gate Creek, a tributary of McKenzie River, about 27 
miles east of Eugene, Oreg. 
Existing project. Plan provides for a gravel embankment 
dam, 270 feet high from lowest point of the 
general foundation to crest and 1,200 feet long. A gatecontrolled 
concrete spillway and regulating outlet 
works will be on right abutment. Reservoir will provide 
50,000 acre-feet of usable flood control storage and 
controls runoff from 46 square miles of drainage area. 
Project was authorized by 1962 Flood Control Act (H. 
Doc. 403, 87th Cong., 2d sess.) to be constructed in lieu 
of Quartz Creek Lake, Oreg., authorized by Flood 
Control Act of 1938. Estimated cost of project (1970) is 
$39,800,000 of which $9,703,000 is for lands and 
damages including relocations and $30,097,000 for 
construction. 
Local cooperation. None required. 
Operations and results during fiscal year. Design memorandums 
consisting of relocations; land requirements 
plan-public use; real estate; and general, including 
foundation and material appendix; were submitted to 
higher authority for review. 
Condition at end of fiscal year. Under advance engineering, 
preparation of design memorandums is in 
progress. Site selection, and hydrology and meteorology 
design memorandums are approved. 
37. LOWER COLUMBIA RIVER BASIN, 
OREG. AND WASH. 
Location. On Columbia River and minor tributaries, 
channels, and sloughs, between Sandy River, Oreg., 
about 15 miles east of Vancouver, Wash., and mouth of 
Columbia River. 
Existing project. Plan for bank-protection work, 
construction of flood control works, and improvements 
to existing projects, in Lower Columbia River Basin, 
was authorized by 1950 Flood Control Act (H. Doc. 
531, 81st Cong., 2d sess.). The plan, as follows, provides 
for new construction and supplementing and extending 
projects constructed in Columbia, Lewis, and Cowlitz 
River Basins under authority of 1936 Flood Control 
Act: (a) Lower Columbia River Basin levees at new 
locations, Oregon and Washington, provides for 
construction of flood control works at: Washougal area, 
Clark County, Wash., about 5.5 miles of levee and 
appurtenant works at an estimated Federal cost (1969) 
of $1,849,295, and non-Federal cost at $98,000; and 
Vancouver Lake area in vicinity of Vancouver, Wash., 
about 18 miles of levee and appurtenant works at an 
estimated Federal cost (1970) of $7,170,000 and non- 
Federal cost at $398,000. Total estimated Federal costs 
(1970) are $9,019,295 and non-Federal costs $496,000. 
Following locations reclassified and excluded from 
foregoing estimate: Kalama R. south area, Cowlitz 
County, Wash., inactive, Federal cost estimate (1969) 
of $743,000 and non-Federal cost of $21,900 Clatskanie 
River area, Columbia County, Oreg., inactive, Federal 
cost estima te (1959) of $183,000 and non-Federal cost 
at $11,000; and Hayden Island, Multnomah County, 
Oreg., inactive, estimated Federal cost (1960) of $615, 
000 and non-Federal at $64,000. (b) Lower Columbia 
River Basin bank protection works, Oregon and 
Washington, provides for bank protection works at 61 
locations on Columbia River and tributaries between 
Sandy River and mouth of Columbia River, totaling 
about 133,680 linear feet. Estimated total Federal cost 
(1970) is $11,300,000 and non-Federal cost is $200,000. 
(c) See table 37-K on Levees and Improvements to 
Existing Works. Approved (1970) Federal cost for all 
active work under project, Lower Columbia River 
Basin, Oreg. and Wash., as authorized by 1950 Flood 
Control Act is $34,120,994. 
Local cooperation. Flood Control Act of 1950 provides 
local interests furnish lands and rights-of-way; make 
necessary highway, highway bridge, and utility al- 
1112

PORTLAND, OREG., DISTRICT 
terations; hold the United States free from damages; 
and maintain and operate completed works. Total 
non-Federal costs are $3,131,000 (1970). For details of 
status or requirements of local cooperation see individual 
project reports. 
Operations and results during fiscal year. See individual 
projects. 
Condition at end of fiscal year. Construction of improvement 
to" existing project in Sandy Drainage 
District, Oreg., was completed by local interests at no 
construction cost to the Government. Construction of 
Multnomah County Drainage District 1, Oreg., 
improvement was completed June 1962. Improvements 
of levees have also been accomplished by contracts at 
the following locations: Sauvie Island Drainage District, 
Oreg., in October 1962; at Woodson Drainage 
Dist., Oreg., December 1963; Rainier Drainage 
District, Oreg., in June 1964; Cowlitz County Diking 
Improvement District 15 in December 1965; Diking 
Improvement Districts Nos. 2 and 13, Wash., in June 
1965; and Midland Drainage District, Oreg., in April 
1967. Construction of improvements is currently under 
way at Cowlitz County Consolidated Diking Improvement 
District No. 2. Planning has been initiated 
for improvements at four districts. Under authorization 
for Lower Columbia River Basin bank protection 
works, construction is complete at 35 locations, of 
which 32 are in 12 drainage or diking districts. 
38. LOWER COLUMBIA RIVER BASIN 
BANK PROTECTION WORKS, OREG. 
AND WASH. 
Location. On Columbia River and tributaries between 
Sandy River, Oreg., and mouth of Columbia 
River. 
Existing project. Provides for construction of 133,680 
linear feet of bank protection works at 61 locations 
along Lower Columbia River below river mile 125 and 
along principal tributaries in this reach, to protect 
existing improvements such as levees and developed 
industrial lands from further erosion. Existing project is 
a unit of general comprehensive plan for flood control, 
navigation, and other purposes in Columbia River 
Basin and was authorized in 1950 Flood Control Act 
(H. Doc. 531, 81st Cong., 2d sess.). Estimated Federal 
cost (1970) is $11,300,000. 
Local cooperation. Flood Control Act of 1950 provides 
local interests furnish lands and rights-of-way; make 
necessary highway, highway bridge, and utility alterations; 
hold the United States free from damages; 
and maintain and operate works after completion. 
Estimated costs for all requirements of local cooperation 
are $200,000 (1970). 
Operations and results during fiscal year. New work: No 
construction work was performed, but a contract was 
awarded for bank protection work at Upper Coal 
Creek Slough Location. Preparation of plans and 
specifications, for contractual work scheduled for 
awards in early fiscal year 1971 is as follows: Switzler 
and Brown Slough Locations, completed; Shields 
Ranch Location, 95 percent complete; and upper 
steigerwald Lake, Steigerwald Lake extension, and 
Durgin Location, 90 percent complete. 
Condition at end of fiscal year. Project construction 
initiated July 1961 is complete at 35 locations, of which 
32 are in 12 drainage or diking districts. Planning for 
construction at five additional locations is underway. 
39. MIDLAND DRAINAGE DISTRICT, 
COLUMBIA COUNTY, OREG. 
Location In northwest part of Columbia County, 
Oreg., 2.5 miles west of town of Clatskanie along left 
bank of Wallace Slough opposite Columbia River 
miles 47.7 and 49.7. 
Existing project Flood Control Act of 1950 authorized 
strengthening existing levee and providing additional 
pumping capacity (H. Doc. 531, 81st Cong., 2d Sess.). 
Estimated Federal cost is $304,511 (1970). 
Local cooperation Flood Control Act 1950 provides 
local interests furnish lands and rights-of-way; make 
necessary highway, highway bridge, and utility alterations; 
hold the United States free from damages; 
and maintain and operate completed works. Estimated 
cost of all requirements of local cooperation under 
terms of project authorization were $33,400 (1967). 
Operations and results during fiscal year. Contract 
awarded June 26, 1970 for bank stabilization work at 
Westport slough. Work to be performed in July 1970. 
Condition at end of fiscal year. Project as authorized was 
initiated May 1966 and completed April 1967, except 
for bank stabilization work. Operation and maintenance 
manuals were completed January 1970 and 
sent to local interests February 1970. 
40. REEDSPORT LEVEE, UMPQUA RIVER, 
OREG. 
Location. On left bank of Umpqua River, 10.0 miles 
upstream from Pacific Ocean, in Lincoln County, 
Oregon. 
Existing project. Consists of levee improvements at 
Reedsport by raising portions of existing levee system. 
Existing project was authorized by Public Law 228, 
77th Cong., 1st sess., approved August 18, 1941 (See 
Umpqua River and Tributaries), and under Section 
205 of the 1948 Flood Control Act, as amended. 
Detailed Project Report for modification under Section 
205 was approved by OCE September 22, 1966. 
Estimated project cost (1970) is $1,230,070, of which 
Federal cost is limited to $1,000,000 and balance of 
$230,070 is estimated non-Federal cost. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New work: 
Construction was initiated September 1968 and 
completed December 10, 1969. Plans for cathodic 
protection of steel sheet piling, to prevent corrosion, 
1113

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
were cancelled after local interest agreed to assume all 
responsibility for the floodwall. 
Condition at end offiscalyear. Project as modified under 
section 205 was initiated September 1968 and completed 
December 1969. 
41. SCAPPOOSE DRAINAGE DISTRICT, 
OREG. 
Location. In Columbia County, Oreg., along left bank 
of Multnomah Channel opposite Columbia River mile 
90.3 to 97.0. 
Existing project. Plan provides for raising and strengthening 
52,000 feet of levee, construction of toe drains, 
and additional pumping capacity. Existing project was 
authorized by 1950 Flood Control Act (H. Doc. 531, 
81st Cong., 2d sess.). Estimated Federal cost (1970) is 
$2,130,000. 
Local cooperation. Flood Control Act of 1950, provides 
local interests furnish lands, easements, and rights-ofway; 
make necessary highway, highway bridge, and 
utility alterations; hold the United States free from 
damages; and maintain and operate completed works. 
Estimated costs of all requirements of local cooperation 
under terms of project authorization were $27,000 
(1970). The Board of Supervisors adopted a resolution 
dated February 12, 1968, indicating approval of the 
proposed work and expressing their ability and 
willingness to provide the necessary local cooperation. 
Operations and results during fiscal year. Advance 
engineering on authorized levees and pumping plant 
was continued. 
Condition at end of fiscal year. Planning for construction 
is underway. Feasibility report submitted in November 
1967. 
42. WAHKIAKUM COUNTY 
CONSOLIDATED DIKING DISTRICT 
NO. 1, WASH. 
Location. District occupies both Puget and Little 
Islands in Columbia River between river miles 30 and 
44.5. These islands are in Wahkiakum County, Wash., 
near town of Cathlamet. 
Existing project. Provides for raising and strengthening 
all levees encircling islands, filling adjacent borrow pit 
ditches, constructing about 6,000 feet of major drainage 
canal, and additional tide box, and a pumping 
plant. Existing project was authorized by 1950 Flood 
Control Act (H. Doc. 531, 81st Cong., 2d sess.). 
Estimated Federal cost (1970) is $2,230,000. 
Local cooperation. Flood Control Act of 1950 provides 
local interests furnish lands and rights-of-way; make 
necessary highway, highway bridge, and utility alterations; 
hold the United States free from damages; 
and maintain and operate completed works. Estimated 
costs for all requirements of local cooperation under 
terms of project authorization were $50,000 (1970). 
Water line relocation discussed in meeting with local 
interest May 15, 1970. Sponsor to furnish letter of 
capability and schedule for line relocation. 
Operations and results during fiscal year. Preparation of a 
design memorandum covering construction of levee 
and pumping plant, essentially completed, was being 
held in abeyance due to lack of receipt of assurances of 
local cooperation. 
Condition at end of fiscal year. Planning for construction 
is being held in abeyance until sponsor investigates 
alternate sources for providing funds to meet the 
requirements of local cooperation. 
43. WAHKIAKUM COUNTY DIKING 
DISTRICT NO. 4, WASH. 
Location. In Wahkiakum County, Wash., between 
Columbia River miles 33.7 and 37.0. 
Existing project. Plan provides for raising and strengthening 
existing levees, improving drainage facilities, and 
constructing two short levees. Existing project was 
authorized by 1950 Flood Control Act (H. Doc. 531, 
81st Cong., 2d sess.). Estimated Federal cost (1970) is 
$675,000. 
Local cooperation. Flood Control Act of 1950 provides 
local interests furnish lands, easements, and rights-ofway; 
make necessary highway, highway bridge, and 
utility alterations; hold the United States free from 
damages; and maintain and operate completed works. 
Estimated costs of all requirements of local cooperation 
under terms of project authorization were $49,000 
(1970). Local interests have furnished informal assurances 
of their willingness and ability to provide the 
requirements of local cooperation. 
Operations and results during fiscal year. Deferral of 
design memorandum submission approved pending U. 
S. Fish and Wildlife Service decision on use of area for 
game refuge. 
Condition at end of fiscalyear. Advance engineering was 
held in abeyance until decision on use of area for game 
refuge is finalized. 
44. WASHOUGAL AREA LEVEES, CLARK 
COUNTY, WASH. 
Location. Area is in southeastern part of Clark 
County, Wash., and extends along Columbia River 
about 4 /2 miles, from Lawton Creek on the east to 
Washougal River on the west, and includes parts of 
towns of Washougal and Camas. 
Existing project. Construction of about 5 1/2 miles of 
levees and two tide boxes and pumping plants to 
protect area from a flood of the 1948 magnitude. 
Existing project was authorized by 1950 Flood Control 
Act (H. Doc. 531, 81st Cong., 2d sess.). Estimated 
Federal cost (1970) is $1,849,200. 
Local cooperation. Flood Control Act of 1950 provides 
local interests furnish lands and rights-of-way; make 
necessary highway, highway bridge, and utility alterations; 
hold the United States free from damages; 
1114

PORTLAND, OREG., DISTRICT 
and maintain and operate completed works. Total 
estimated costs of all requirements of local cooperation 
under terms of project authorization were $98,000 
(1970). 
Operations and results during fiscal year. New work: 
Preparation of plans and specifications for modification 
of landward slope blanket, to correct seepage 
condition, is 50 percent complete. Completion of design 
delayed by necessity for consideration of more economical 
alternate treatment. 
Condition at end of fiscal year. Construction of project 
was initiated April 1965 and was completed October 
1966. First contract to correct flood seepage condition 
was completed July 1968. Plans for second contract are 
underway. 
45. WILLAMETTE RIVER BASIN, OREG. 
Location. Willamette River is formed by Coast and 
Middle Forks which join a few miles above Eugene, 
Oreg., flows north 189 miles, and enters Columbia 
River 1 01.5 miles above its mouth. Basin has an area of 
11,200 square miles and lies between Cascade Range 
on the east and Coast Range on the west. Major 
tributaries of Willamette River rise in Cascade 
Mountains and consist of Coast and Middle Forks and 
McKenzie, Calapooia, Santiam, Molalla, and Clackamas 
Rivers. Important tributaries that head in the 
Coast Range are Luckiamute, Yamhill, and Tualatin 
Rivers. Minor tributaries, all of which enter main 
stream from the west, are Marys River, Rickreall 
Creek, and Long Tom River. 
Existing project. Flood Control Act of 1938 approved 
general comprehensive plan for flood control, navigation, 
and other purposes in Willamette River Basin 
(H. Doc. 544, 75th Cong., 3d sess.) and authorized $11, 
300,000 for initiation and partial accomplishment of 
plan recommended for initial development; the reservoirs 
and related works to be selected by Chief of 
Engineers. Subsequent Flood Control Acts, 1941 
through 1965, authorized additional flood control and 
other works and increased monetary authority. Columbia 
River Basin, including Willamette River Basin, 
monetary authorization is $1,750,300,000 (1970). (See 
table 37-J on Willamette River Basin comprehensive 
plan.) 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies to reservoir projects. Local cooperation 
for other projects is in individual reports for 
those projects. 
Operations and results during fiscal year. See individual 
reports. 
Condition at end of fiscal year. Following projects were 
completed as authorized and in continuous operation: 
Fern Ridge Lake, August 1951; Cottage Grove Lake, 
March 1952; Dorena Lake, October 1952; Detroit 
Lake, December 1960; Lookout Point Lake, June 
1961; Hills Creek Lake, June 1963; Cougar Lake, 
March 1964; Fall Creek Lake, November 1965; Green 
Peter-Foster Lakes, June-December, 1967 respectively; 
and Blue River Lake, October 1968. Under the 
authorization for construction of recreation facilities on 
completed projects, work has been accomplished at 
Fern Ridge, Cottage Grove, Dorena, and Lookout 
Point Lakes. Advance engineering and design for 
proposed construction of Gate Creek Lake and 
Cascadia Lake, are underway. Advance engineering 
and design for proposed construction of Holley Lake 
project was placed in deferred status pending completion 
of a study to determine extent of increased 
capacity required in Calapooia River for flood control 
operation of the project. Details of operation, construction, 
and financial status of projects are in 
individual reports. During low-water season, July- 
September, supplemental water releases are made from 
Willamette River Basin Reservoirs for conservation 
purposes. Interests which benefit from increased 
downstream flows include irrigation, navigation, power, 
pollution abatement, and recreation. Although 
optimum regulation cannot be provided for every 
conservation interest, water released from reservoirs 
during the low-water season for a particular purpose 
will usually provide benefits to other conservation uses 
as well. Basic policy is to provide most beneficial 
overall regulation, consistent with established wateruse 
priorities. 
46. WILLAMETTE RIVER BASIN, OREG. 
(BANK PROTECTION) 
Location. On Willamette River and tributaries, 
between Cascade Range and Coast Range, from a 
point south of Eugene to Portland, Oreg. 
Existing project. Provides for clearing, sloping, and 
revetting riverbanks; construction of pile-and-timber 
bulkheads and drift barriers; minor channel improvements; 
and maintenance of existing works for 
control of floods and prevention of erosion at various 
locations along Willamette River and its tributaries. 
Existing project was authorized by Flood Control Acts 
of 1936 and 1938. Flood Control Act of 1950 
authorized similar work at 77 additional locations. 
Estimated Federal cost of project (1970) is $13,350,000. 
Local cooperation. Section 3, Flood Control Act of 1936, 
applies. Estimated costs for all requirements of local 
cooperation under terms of project authorization were 
$263,000 (1970). 
Operations and results during fiscal year. New work: 
Construction was underway at Eisemann Location, 
North Santiam River, Mile 2.2; Hart Upstream 
Extension, McKenzie River, mile 24.5; and Sawer 
Location, Willamette River, mile 165.2. Bank protection 
work at Laird Location, Middle Fork Willamette 
River, mile 6.1 was completed in October 
1969. Preparation of plans and specifications was 
under way for four additional locations. Maintenance: 
Spraying of woody growth on existing bank protection 
1115

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
works at 86 locations was completed by contract 
August 28, 1969. 
Condition at end of fiscal year. Construction of project 
began in 1938 and is 97 percent complete. A total of 
433,495 linear feet of bank protection works at 197 
locations, consisting of revetment of river banks, pile 
and timber bulk heads, drift barriers, and channel 
improvements, have been completed on Willamette 
River and tributaries. 
47. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Funds appropriated for inspection of completed 
local flood protection works are used to determine 
condition of completed works and to ascertain whether 
those works are being properly maintained by local 
interests. A total of 58 leveed areas and 103 bank 
protection works were inspected at various locations 
along both banks of Lower Columbia River below 
Bonneville Dam, along Oregon Coast and in Willamette 
River Basin. Of this total, 35 leveed areas in 
Oregon and 11 leveed areas in Washington along 
Lower Columbia River; and 12 leveed areas and 3 
revetments along Oregon Coast were inspected July 
1969 through June 1970. Also during May 1970, 100 
revetments along Willamette River and tributaries 
were inspected. A representative of sponsoring districts 
accompanied the Portland District representatives 
performing the levee inspections. Aerial inspections of 
revetments in Willamette River Basin was supplemented 
by an on site inspection at locations 
requiring maintenance. Deficiencies in maintenance 
and need for repairs were discussed with sponsoring 
districts' representatives and a report was made to each 
sponsor with recommendations for improving maintenance. 
The campaign to improve maintenance of 
completed Federal projects initiated by House Appropriations 
Committee on Civil Functions was continued. 
Periodic contact was maintained with uncooperative 
areas reported in fiscal year 1969 to 
ascertain any change in attitude and to provide 
technical assistance, if requested. Of the 161 local flood 
protection projects inspected in Portland District, 9 
were reported deficient in maintenance. Fiscal year 
costs were $28,671 and costs to June 30, 1970 were 
$291,683. 
48. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Corps of Engineers monitored flood control operation 
at three Bureau of Reclamation projects: 
Prineville, Ochoco and Emigrant Lake. The Bureau of 
Reclamation Projects were partially constructed with 
flood control funds; therefore, the flood control 
operation for those projects is subject to review by the 
Corps of Engineers under Section 7, Flood Control Act. 
During fiscal year 1970 there was no major floods on 
those streams on which the above projects were located. 
Flood control operations and storage reservations 
conformed to the schedule shown in their authorizing 
documents. All the reservoirs filled to their scheduled 
maximum conservation levels following the flood 
season. Flood Control Reservoir Regulation Reports 
for Prineville, Ochoco and Emigrant Lake have been 
approved by higher authority and the basic operating 
criteria have been filed with the Federal Register. 
Total costs for fiscal year 1970 were $1,246. 
49. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS - 
See table 37-L. 
50. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 
858, 80th Congress, as amended (preauthorization) 
See table 37-M. 
Emergency flood control activities--repairf,l oodf ighting and 
rescue work (Public Law 99, 84th Cong., and antecedent 
legislation) 
(See table 37-M on flood control work under special 
authorization.) 
MULTIPLE-PURPOSE PROJECTS 
INCLUDING POWER 
51. BONNEVILLE LOCK AND DAM, 
OREG. AND WASH. (LAKE 
BONNEVILLE). 
Location. Project is on Columbia River, 42 miles east 
of Portland, Oreg., about 146 miles above mouth of 
river. For description of Columbia River see Improvement 
No. 4. 
Existing project. A dam, powerplant, and lock for 
power and navigation. Spillway dam ex tends across 
main channel from Washington shore to Bradford 
Island, which divides the river at this point. Overflow 
crest at 24 feet above mean sea level is surmounted by 
18 vertical-lift steel gates placed between piers which 
extend to elevation 99 feet where a service roadway 
permits operation of two 350-ton gantry cranes for 
regulating gates. Powerhouse extending across Bradford 
Slough to Oregon shore has an installation of 10 
units, consisting of two units of 43,200 kilowatts each 
and eight units of 54,000 kilowatts each, totaling 518, 
400 kilowatts. Ordinary and extreme fluctuations of 
river at lower lock gate are about 21 and 47 feet, 
respectively. Project includes fish ladders and locks to 
serve both main channel and Bradford Slough channel. 
Navigation lock and powerhouse are founded on 
andesite, and main dam rests upon solidified sedimentary 
rock of volcanic origin. Pool created by dam 
provides a navigable channel with a depth of 30 feet 
and over between Bonneville and The Dalles Dams, a 
distance of 47 miles. Principal data concerning 
1116

PORTLAND, OREG., DISTRICT 
navigation lock spillway dam, and powerplant are set 
forth in table 37-N. 
Dam, navigation lock, 10-power unit generating 
installation, fishways, and attendant buildings and 
grounds cost $83,239,395, of which $6,072,480 is for 
navigation facilities, $39,350,824 for power facilities 
and $37,816,091 for joint facilities, consisting of dam, 
fishways, buildings, and grounds, and headwall section 
of power units 0 to 6, cost of which ($2,106,000) is 
allocated to dam and lake facilities. Under Flood 
Control Acts of 1944, 1946 and 1954 project was 
authorized for construction of recreation facilities. 
Estimated total Federal cost of completed project 
(1970) is $84,348,400 which includes $1,109,000 for 
construction of recreation facilities at completed 
project. (See table 37-B for authorizing legislation.) 
Letter from Bonneville Power Administration to 
North Pacific Division dated January 21, 1965, 
requested construction of a second powerhouse. Estimated 
cost (1970) is $168,500,000, which includes 
$21,500,000 for modification for peaking and $147,000, 
000 for construction of second powerhouse. Of this 
$168,500,000, $13,582,000 is for land and damages 
including relocations and $154,918,000 is for construction. 
Local cooperation. Estimated cost of local cooperation 
on basis of cost sharing for additional recreation 
facilities is $1,000,000. 
Operations and results during fiscal year. New Work: 
Design memorandums being prepared for construction 
of second powerhouse were: hydropower capacity and 
powerhouse site selection; general; environmental 
planning; and real estate. Design memorandums for 
modification for peaking were completed, and plans 
and specifications in various stages of completion were: 
fish facilities, 80 percent; spillway gates, 95 percent; 
Bradford Island fishladder water supply tainter valve, 
85 percent; and miscellaneous modifications at project, 
5 percent. Land acquisition and planning for construction 
of recreation facilities, authorized under Code 
710, was continued. Maintenance: Normal operation 
and maintenance continued with contracts to install 
heaters at hydraulic laboratory and rewind generator 
Unit No. 7 completed in September 1969 and October 
1969, respectively. Contracts awarded, and in various 
stages of completion were: rewind generator No. 9 and 
replace center load fused starters. During the fiscal 
year 4,450,465,000 kilowatt-hours of electrical power 
energy were generated, of which 4,435,048,000 killowatt-
hours were delivered to Bonneville Power 
Administration, the marketing agency. 
Condition at end of fiscal year. Construction of project 
started October 1933, was completed February 1953. 
Modification of powerhouse control equipment started 
March 1957, was completed September 1958. First two 
power units were placed in operation during fiscal year 
1938. Powerhouse with complete installation of 10 
units, was in operation December 1943. Advance 
451-584 0-72-71 
engineering for construction of second powerhouse is in 
progress. Design memorandums, plans and specifications 
for modifications for peaking are in progress 
with spillway gates contract scheduled for award in 
early fiscal year 1971. Plans for construction of 
additional recreation facilities are underway. 
52. COUGAR LAKE, OREGON 
Location. At mile 4.4 on South Fork McKenzie River 
which joins McKenzie River about 56.5 miles above its 
confluence with Willamette River. Project is about 42 
miles east of Eugene, Oregon. 
Existing project. A rockfill dam with an impervious 
earth core, about 1,400 feet long at crest and 515 feet 
high above the lowest point of the general foundation. 
Reservoir is 6 miles long with storage capacity at full 
pool of 219,000 acre-feet and controls runoff of 
tributary drainage area of 210 square miles. Spillway is 
on right abutment and outlet and power tunnels in left 
abutment. Outlet tunnel is provided with a chute and 
stilling basin. Powerplant consists of two 12,500 
kilowatt units with minimum provisions for installing a 
third unit of 35,000 kilowatts for future peaking 
capacity. Improvement functions as a unit in coordinated 
system of reservoirs for multiple-purpose 
development of water resources in Willamette River 
Basin. Project is one of two storage reservoirs authorized 
by 1950 Flood Control Act to be constructed 
in lieu of Quartz Creek Lake authorized by 1938 Flood 
Control Act. Flood Control Act of 1954 authorized 
installation of power facilities. Estimated project cost 
(1970) is $54,700,000, of which $9,800,000 is for lands 
and damages including relocations, and $44,900,000 
for construction. 
Local cooperation. None required. 
Operations and results during fiscal year. New Work: 
Preliminary design and investigation for selection of 
hatchery site was 20 percent completed. Maintenance: 
Ordinary operation and maintenance continued. 
Preparation of required project operation and maintenance 
manual is in progress. During fiscal year 150, 
159,000 kilowatt-hours of electrical energy were 
generated at project, of which 149,342,000 kilowatthours 
were delivered to Bonneville Power Administration, 
the marketing agency. Freshets regulated 
by Cougar Lake project on South Fork McKenzie 
River are shown on table 37-I. 
Condition at end of fiscal year. Construction of project 
initiated June 1956 is essentially complete. Generating 
units I and 2 were placed in commercial operation 
March 23 and February 4, 1964, respectively. Physically 
inservice date for flood control was November 29, 
1963. Engineering studies for selection of hatchery site 
are underway. 
53. DETROIT LAKE, OREG. 
Location. On North Santiam River with dam 50 miles 
from mouth and 45 miles southeast of Salem, Oreg. 
117

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
North Santiam River flows north and west for 85 miles, 
and unites with South Santiam River to form Santiam 
River, which 10 miles downstream enters Willamette 
River 108 miles above its mouth, 
Existing project. One main dam and a reregulating 
dam, both with power-generating facilities. Detroit 
Dam is a concrete, gravity structure about 1,522 feet 
long and 454 feet high from lowest point of the general 
foundation to roadway deck. Spillway is a gatecontrolled 
overflow section, and outlet works are gatecontrolled 
conduits through dam. Powerhouse with two 
units having a capacity to 50,000 kilowatts each is in 
right abutment immediately below dam. Reservoir has 
a storage capacity at full pool of 454,900 acre-feet and 
controls runoff of tributary drainage area of 438 square 
miles. It is being operated as a unit in coordinated 
reservoir system to protect Willamette Valley from 
floods, to increase low waterflows in interest of 
navigation and irrigation, to generate power, and for 
other purposes. Reregulating dam 3 miles downstream 
at Big Cliff site is concrete gravity type, about 191 feet 
high from lowest point of the general foundation to 
roadway deck. Power installation consists of one unit 
with a capacity of 18,000 kilowatts. Reservoir has a 
storage capacity of 5,930 acre-feet at full pool. Project 
is a unit of comprehensive plan for flood control and 
other purposes in Willamette Basin. Existing project 
was selected for construction under general authorization 
for Willamette River Basin in 1938 Flood 
Control Act. Flood Control Acts of 1944 and 1946 
modified project to provide for recreation facilities, and 
1948 Flood Control Act modified existing project to 
provide for installation of hydroelectric power-generating 
facilities including construction of a reregulating 
dam. 
Local cooperation. None required. 
Operations and results during fiscal year. New Work: 
Preparation of plans and specifications for repair of 
south side Minto Dam was delayed until claim 
settlement is finalized. Maintenance: Preparation of 
revised operation and maintenance manual was in 
progress. Ordinary operation and maintenance continued. 
During fiscal year 496,132,000 kilowatt-hours 
of electrical energy were delivered to Bonneville Power 
Administration, the marketing agency. Freshets regulated 
by the Detroit Lake project on North Santiam 
River are shown in table 37-I. 
Condition at end of fiscal year. Construction of project 
begun in May 1947 was completed December 1960. 
The two powerhouse generating units were placed in 
commercial operation June and October 1953. At Big 
Cliff powerhouse, single generating unit was placed onthe-
line June 1954. Use of Big Cliff Dam for reregulating 
fluctuating flow from Detroit units was 
effected October 1953. 
54. GREEN PETER-FOSTER LAKES, 
OREGON. 
Location. At approximate mile 5.5 on Middle 
Santiam River which joins South Santiam River about 
56.8 miles above its confluence with Willamette River, 
Dam is about 30 miles southeast of Albany in Linn 
County, Oregon. 
Existing project. One main dam and a re-regulating 
dam, both with power-generating facilities. Green 
Peter Dam is a concrete gravity structure, 1,400 feet 
long and 385 feet high above the lowest point of the 
general foundation with a gate-controlled spillway. 
Outlet works consist of two conduits through spillway, 
discharging into a stilling basin. Powerplant, on right 
bank adjacent to spillway stilling basin, consists of two 
units with an installed capacity of 80,000 kilowatts. 
Reservoir provides storage capacity at full pool of 430, 
000 acre-feet, extending 6.5 miles up Quartzville Creek 
and some 7.5 miles up Middle Santiam River above 
creek junction, forming a Y-shaped pool. Reservoir 
controls runoff of tributary drainage area of 277 square 
miles. Foster Dam, 7 miles downstream from Green 
Peter Dam, was authorized by Flood Control Act of 
1960 to be constructed in lieu of White Bridge reregulating 
dam authorized Flood Control Act of 1954. 
Foster Dam is located on South Santiam River about 
38 miles above its confluence with Santiam River and 
1.5 miles below its confluence with Middle Santiam 
River. Foster Dam consists of an earth and gravel rockfilled 
embankment, 146 feet high from lowest point of 
the general foundation and a concrete gravity gatecontrolled 
spillway and stilling basin for a total length 
of 4,800 feet. Power installation consists of two units 
with a capacity of 20,000 kilowatts. Foster Lake has a 
storage capacity, at full pool, of 61,000 acre-feet. 
Project functions as a unit in coordinated system of 
reservoirs for multiple-purpose development of water 
resources in Willamette River Basin. Green Peter Lake 
was originally authorized by Flood Control Act of 1950 
to be constructed in lieu of Sweet Home Lake 
authorized by Flood Control Act of 1938. Flood 
Control Act of 1954 authorized installation of power 
facilities at Green Peter Dam. Estimated Federal cost 
of project (1970) is $83,902,000 of which $18,104,000 is 
for lands and damages including relocations and $65, 
798,000 for construction which includes an estimated 
$1,102,000 for additional recreation facilities at completed 
project. 
Local cooperation. Estimated cost of local cooperation 
on basis of cost-sharing for recreation facilities is $1,102, 
000. 
Operations and results during fiscal year. New Work: Two 
contracts, fencing and miscellaneous work at Green 
Peter and Foster, and debris cleanup at Green Peter 
were completed July 1969 and August 1969, respectively. 
Preparation of two design memorandums, 
public use plan, and cleanup and landscaping were in 
progress. Plans and specifications advanced to various 
1118

PORTLAND, OREG., DISTRICT 
stages of completion were: mechanical work, 99 
percent; roadway and site improvements, 80 percent; 
service buildings, paving and landscaping, 70 percent; 
and recreation facilities at Lewis Creek, Sunnyside and 
Whitcomb Creek, 99 percent. Maintenance: Normal 
operation and maintenance being performed. A 
contract for repair of concrete wall at Green Peter was 
completed February 1970. Preparation of plans and 
specifications for powerho use roof replacement at 
Foster was under way. During fiscal year 341,602,000 
kilowatt-hours of electrical energy was generated at 
project of which 337,571,000 kilowatt-hours were 
delivered to Bonneville Power Administration, the 
marketing agency. Freshets regulated by Green Peter 
Lake project on Middle Santiam River are shown in 
table 37-I. 
Condition at end of fiscalyear. All major construction on 
Green Peter-Foster Lakes project initiated June 1961 is 
completed. Green Peter Lake was placed in operation 
for useful flood control June 1967 as a unit of 
coordinated reservoir system for protection of the 
Willamette River Basin. First power-generation unit 
was placed on the line June 9,1967 and second, June 
28, 1967. Use of Foster Lake for reregulating fluctuating 
flows from Green Peter units was effective 
December 1967. First power generation unit was 
placed on-the-line August 22, 1968 and second, 
September 6, 1968. Completion of minor construction 
items under way. 
55. HILLS CREEK LAKE, OREG. 
Location. On the Middle Fork, Willamette River, 47.8 
miles from mouth and 26.5 miles upstream from 
Lookout Point Dam. Middle Fork, Willamette River 
rises on west slope of Cascade Range and flows 
northwesterly to its junction with Coast Fork, Willamette 
River. Dam is about 45 miles southeast from 
Eugene, Oreg. 
Existing project. An earth-and-gravel-fill dam about 2, 
150 feet long at the crest and 338 feet above lowest 
point of the general foundation. A gate-controlled 
concrete gravity chute-type spillway is in right abutment. 
Diversion tunnel, outlet tunnel, and power 
tunnel are in same abutment. Powerhouse with two 15, 
000 kilowatt units is located next to spillway. Hills 
Creek Lake is about 8.5 miles long and provides storage 
capacity at full pool of 356,000 acre-feet. Project 
controls runoff of drainage area of 389 square miles and 
is an integral unit of comprehensive plan for development 
of water resources of Willamette River 
Basin. Hills Creek Lake and Lookout Point Lake are 
operated as a unit for control of floods and generation 
of power on Middle Fork Willamette River. These 
projects, in conjunction with Dexter reregulating dam 
and Fall Creek Lake flood control system, will 
effectively control floods on Middle Fork and provide 
maximum efficient generation of hydroelectric power. 
Hills Creek Lake project was authorized by 1950 Flood 
Control Act. Total cost of project is $45,700,619, of 
which $10,977,500 is for lands and damages including 
relocations, and $34,723,119 for construction. 
Local cooperation. None required. 
Operations and results during fiscal year. Ordinary 
operation and maintenance continued. During fiscal 
year 158,492,000 kilowatt-hours of electrical power 
were generated, of which 157,824,000 kilowatt-hours 
were delivered to Bonneville Power Administration, 
the marketing agency. Freshets regulated by Hills 
Creek Lake on Middle Fork Willamette River are 
shown in table 37-I. 
Condition at end of fiscal year. Construction of project, 
initiated May 1956, was completed June 1963. The 
project was placed in service for useful flood control in 
November 1961. On May 2, 1962 the two power 
generation units were placed on-the-line. 
56. LOOKOUT POINT LAKE, OREG. 
Location. On Middle Fork, Willamette River at 
Meridian site, 21.3 miles from mouth. Middle Fork, 
Willamette River, rises in Lane County on western 
slope of Cascade Range and flows northwesterly to its 
junction with Coast Fork, which is head of main stem 
Willamette River. Dam is about 22 miles southeast 
from Eugene, Oreg. 
Existing project. A main dam at Meridian site and a 
reregulating dam 3 miles downstream at Dexter site. 
Both dams are earth-and-gravel-fills with concrete 
spillways and have power generating facilities. Main 
dam is 258 feet high from lowest point of the general 
foundation to deck and is 3,381 feet long at crest 
forming a reservoir 14.2 miles long providing storage of 
456,000 acre-feet at full-pool level. Reservoir controls 
runoff of tributary drainage area of 991 square miles. 
Spillway, 274 feet long, is a gate-controlled overflow 
type, forming right abutment. Outlet works consisting 
of slide-gate-controlled conduits pass through spillway 
section. Powerhouse has three main generating units 
with a capacity of 120,000 kilowatts. Reregulating dam 
has a maximum height of 107 feet above lowest point of 
the general foundation and is 2,765 feet long at crest, 
forming a full pool of 27,500 acre-feet extending 
upstream to main dam and providing pondage to 
regulate Lookout Point powerhouse water releases to a 
uniform discharge. Spillway consists of a gate-controlled 
overflow section 509 feet long forming right 
abutment. Flow regulation is accomplished by use of 
spillway gates and releases through powerhouse, which 
contains one 15,000-kilowatt unit. Lookout Point and 
Dexter Lakes are operated as a single unit of a 
coordinated system of reservoirs to protect Willamette 
River Valley against floods, to provide needed hydroelectric 
power, and to increase low waterflows for 
navigation, irrigation, and other purposes. Existing 
project authorized as a unit of comprehensive plan for 
flood control and other purposes in Willamette River 
Basin, was authorized by 1938 Flood Control Act (H. 
1119

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Doc. 544, 75th Cong., 3d sess.). Flood Control Acts of 
1944, 1946, and 1954 modified project for recreation 
facilities. Flood Control Act of 1950 (H. Doc. 531, 81st 
Cong., 2d sess.) modified project to provide powergenerating 
facilities. Estimated total Federal cost of 
project (1970) is $88,714,000 of which $37,039,000 is 
for lands and damages including relocations and $51, 
675,000 for construction. Included in the latter amount 
is the estimated Federal cost of $933,000 (1970) for 
construction of additional recreation facilities at the 
completed project. 
Local cooperation. Estimated costs of local cooperation 
on basis of cost-sharing for recreation facilities is $749, 
000. 
Operations and results during fiscal year. New work: 
Planning and engineering were continued for additional 
recreation facilities under Code 711 funds. 
Maintenance: Normal operation and maintenance 
continued with contracts for fabrication of 50-ton 
spillway crane, construction of gate crane facilities, and 
centralization of controls in progress. During fiscal year 
434,963,000 kilowatt-hours of electrical power energy 
were generated at project of which 433,499,000 
kilowatt-hours were delivered to Bonneville Power 
Administration, the marketing agency. Freshets regulated 
by Lookout Point Lake project on Middle Fork 
Willamette River are shown in table 37-I. 
Condition at end of fiscal year. Construction of project 
initiated May 1947 was completed June 1961, except 
for construction of additional recreation facilities 
authorized in 1954. At Lookout Point powerhouse, 
generating units 1 and 2 were placed in commercial 
operation December 1954, and February 1955, respectively. 
Unit 3 was placed on-the-line April 1955. 
At Dexter powerhouse the single unit was placed onthe-
line May 1955. Use of Dexter Lake for reregulating 
fluctuating flows from Lookout Point units was effected 
in December 1954. 
57. LOST CREEK LAKE, ROGUE RIVER 
BASIN, OREG. 
Location. On upper Rogue River at mile 153.6 about 
26.5 miles northeasterly from Medford, Oreg. 
Existing project. Provides for rock and gravel-fill 
embankment dam about 360 feet high above lowest 
point of the general foundation with an overall length 
of 3,750 feet with an impervious earth core and a gatecontrolled 
concrete spillway. Powerhouse will be on 
right abutment and house two Francis-type turbines 
with installed capacity of 24,500 kilowatts each. 
Regulating outlet facility with provisions for temperature 
regulation for releases in interest of fishery 
enhancement will also be in right bank. Reservoir 10 
miles long will provide 315,000 acre-feet of usable 
storage. Project will provide control of runoff of 
drainage area of 674 square miles. In addition to 
hydroelectric power generation, project will be operated 
to provide flood control, irrigation, future 
municipal and industrial water supply, fish and 
wildlife enhancement, water quality control and 
recreation benefits. Project was authorized by 1962 
Flood Control Act (H. Doe. 566, 87th Cong., 2d sess.). 
Estimated project cost (1970) is $112,000,000 of which 
$22,486,000 is for lands and damages including 
relocations and $89,514,000 for construction. 
Local cooperation. Authorizing act requires that local 
agencies furnish assurances pr ior to construction that 
demands will be made for future use of water supply 
storage within a period that will permit repayment of 
costs, including interest, allocated to water supply 
within life of the project; that State of Oregon take 
action, prior to construction to insure maintenance in 
stream of flows to be released for fishery; in addition, 
costs allocated to irrigation would have to be repaid in 
manner and to an extent consistent with Reclamation 
laws and policies; and costs allocated to power will be 
repaid on a system basis by revenue from sales of power 
in Pacific Northwest Federal system by Bonneville 
Power Administration. Assurances for municipal and 
industrial water supply have been obtained from 6 
communities in Rogue River Valley. On February 26, 
1966 Oregon State Game Commission agreed to 
operate Rogue River hatchery for mitigation and 
enhancement of fish. U.S. Bureau of Reclamation has 
completed feasibility study for irrigation of Medford 
Division from Lost Creek and Elk Creek Lakes and will 
determine repayment requirements by local interests. 
Operations and results during fiscal year. New work: 
Relocation contract for construction of right bank and 
bypass road was initiated April 1970 and advanced to 6 
percent. Remodeling of motel building for resident 
engineer's office was completed, under contract, June 
1970. Construction of fish hatchery and appurtenant 
works was awarded in mid-June 1970. Preparation of 
contract plans and specifications for bridge; dam and 
appurtenant structures; relocation; and reservoir 
clearing continued. Preparation of design memorandums 
covering real estate, reservoir regulations, 
building and grounds, powerhouse structure and 
public use plans was in progress. 
Condition at end of fiscal year. Project initiated July 1967 
is 6.7 percent complete. Construction of road, and fish 
hatchery and appurtenant works is in progress. Work 
continues on design memorandums and contract plans 
and specifications. Land acquisition is 54 percent 
complete. 
58. THE DALLES LOCK AND DAM, 
WASH. AND OREG. (LAKE CELILO) 
Location. On Columbia River at head of pool behind 
Bonneville Dam, about 193 miles above mouth of river 
and 90 miles east of Portland, Oreg. 
Existing project. A dam, powerplant, navigation lock, 
and appurtenant facilities. Improvement provides for 
navigation and hydroelectric power generation. Dam is 
designed for a normal pool at elevation 160 feet at 
1120

PORTLAND, OREG., DISTRICT 
mean sea level. Normal pool forms a reservoir 
extending upstream about 25 miles providing slackwater 
to John Day Dam site. The Dalles Dam is 8,700 
feet long and consists of a rock, gravel, and sand river 
closure section from Oregon shore connecting to a 
nonoverflow section which in turn joins powerhouse, 
then concrete nonoverflow sections connecting spillway 
with powerhouse and spillway with navigation lock at 
right abutment on Washington shore. Fish-passing 
facilities including two ladders are provided. Powerhouse 
is constructed for 14 units which were installed 
initially and with substructure constructed for 8 
additional units, an ultimate total of 22 units. Initial 
installation, including two 13,500 kilowatt fishwater 
units, is 1,119,000 kilowatts. Structures are founded on 
Columbia River basalt. Principal data concerning 
lock, spillway, and powerhouse are set forth in table 37- 
N. Estimated Federal cost of initial work, Units 1-14 
(1970) is $248,979,000, of which $55,200,000 is for 
lands and damages including relocations, and $193, 
779,000 for construction which includes $1,979,000 for 
construction of recreation facilities at completed 
project. Under Flood Control Acts of 1944, 1946, and 
1954 project was authorized for construction of 
recreation facilities. Plan of improvement provides for 
extending powerhouse from existing 14 units to 
authorized 22 units and for addition of 8 turbines and 
generator units. Estimated Federal cost for additional 
power units is $53,000,000 (1970). Total Federal 
project cost estimate is $301,979,000 (1970). Project 
was authorized by 1950 River and Harbor and Flood 
Control Act (H. Doc. 531, 81st Cong., 2d sess.). 
Local cooperation. Estimated cost of local cooperation 
on basis of cost sharing for additional recreation 
facilities is $677,000. 
Operations and results during fiscal year. New work: 
(Units 15-22) Contracts awarded and in various stages 
of completions were: transformers, 4 percent; completion 
of powerhouse, 5.5 percent; and digital 
operations controller, 12 percent. Other contracts 
awarded but not initiated were: 230 KV equipment; 
double-ended unit substation; lighting substation; and 
480 V control center. Continuing contracts from 
previous fiscal year in various stages of completion 
were: transformers, terminated May 6, 1969; Kaplan 
type turbines, 70 percent; generators, 6 percent; 
emergency gantry crane, 55 percent; circuit breakers 
and ground equipment, 19 percent; isolated phase bus 
structure, 55 percent; and control switchboards, 66 
percent. Plans and specifications for turbine governors 
were completed with contract scheduled for award in 
August 1970. Batteries will be procured through 
Government Services Administration. Under recreation 
facilities at completed projects funding, construction 
of shoreline erosion repair and extension of 
recreation development at Horsethief Lake was 67 
percent completed. Preparation of plans and specifications 
for other recreation facilities at Maryhill 
Park was 48 percent completed. Maintenance: Ordinary 
operation and maintenance continued. U. S. 
Pipeline Dredge Wahkiakum removed 37,600 cubic 
yards of material from lock entrance. During fiscal year 
7,355,117,000 kilowatt-hours of electrical power energy 
were generated at project of which 7,335,962,000 
kilowatt-hours were delivered to Bonneville Power 
Administration, the marketing agency. 
Condition at end of fiscal year. Major construction of 
project, initiated February 1952, was completed 
October 1960, when unit No. 14 was placed in 
commercial operation. Initial contract for additional 
units 15-22 was awarded September 1967. Additional 
8-unit phase is 21 percent complete. Planning for 
supplemental recreation facilities continued. 
59. OTHER AUTHORIZED MULTIPLEPURPOSE 
PROJECTS INCLUDING 
POWER 
See table 37-0. 
GENERAL INVESTIGATIONS 
60. SURVEYS 
Fiscal year costs were $931,549 of which $91,466 was 
for navigation studies, $388,173 for flood control 
studies, $30,813 for special studies, and $421,097 for 
comprehensive basin studies. 
61. COLLECTION AND STUDY OF BASIC 
DATA 
International water studies. The Columbia River Treaty 
between Canada and the United States relating to 
International Cooperation in Water Resources Development 
of the Columbia River Basin was signed at 
Washington, D.C. on January 17, 1961. 
Implementation of the Treaty by the Entities under 
the guidance of the Permanent Engineering Board and 
the Coordinating Committee has continued. An 
operating program has been agreed to and established 
for Canadian storage operation through June 1972. 
The Entities have established two permanent committees, 
a Flood Control Operating Committee and a 
Hydrometeorological Committee. All present International 
Task Forces are to be disbanded when the 
Flood Control Plan has been completed, except for 
portions affecting Libby project in Montana, and Mica 
project in British Columbia pending possible modification 
of the International Joint Commission Orders 
for Kootenai Lake. Costs during fiscal year were $84, 
014. 
Flood Plain Information Studies. Field surveys and other 
means were used to collect basic flood data to compile 
channel cross sections, water surface profiles, stage 
hydrographs and flooded-area maps for inclusion in 
two flood plain information reports, both undertaken 
in fiscal year 1970. A narrative, including a description 
of the flood situation along each stream studied, was 
also prepared for publication in the reports. Of the two 
1121

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
reports the following one, "Corvallis-Philomath Area, 
Oregon, Flood Plain Information Report-Willamette 
and Marys Rivers", is near completion, while the other 
is identified in table (37-P). Final preparation work 
was accomplished on two additional reports also listed 
as completed in table 37-P. Costs for flood plain 
information studies during the fiscal year were $149, 
805. Total costs for collection and study of basic data 
were $233,819. 
62. RESEARCH AND DEVELOPMENT 
Water quality investigation. Program of observing water 
temperatures and monitoring dissolved oxygen at key 
Willamette Basin reservoirs was continued with the 
Federal Water Quality Administration taking a less 
active part. The Fish Commission of Oregon is still 
active in monitoring specific projects where they have a 
definite fishery interest. A report on District Water 
Quality Activities during 1969 was submitted to higher 
authority by the North Pacific Division office. Stored 
water in Willamette reservoirs was released in substantial 
quantities during the summer 1969 to alleviate 
a fishery passage problem in the Portland Harbor 
caused by a deficiency in the dissolved oxygen level. 
The Portland District continued its financial assistance 
to a special river temperature investigation in the 
Lower Columbia River, a program to study the 
feasibility of using Columbia River water as a coolant 
for a nuclear power plant. The turbidity problem at 
Hills Creek Lake remains and the problem will be 
given further study. A special grant has been requested 
so that specialists from outside the Federal agencies can 
be brought in to study the problem as it has 
implications involving other storage projects being 
studied by this office. 
Hydrologic studies. Reservoirs temperatures, dissolved 
oxygen, and suspended sediment were analyzed, and 
procedures for making synthetic reservoir temperature 
studies are being refined. A consulting firm was 
retained to study a specific project for the purpose of 
enhancing the program. Programs for using the 
computer to make hydrologic studies are being 
expanded and refined. Authority to automate reporting 
hydrologic network in the Willamette Basin 
was requested by the North Pacific Division. The 
system when activated would eliminate the manual 
collection and processing of a vast amount of basic 
stream, reservoir and weather information collected 
daily throughout the basin. Procedures for maximization 
of benefits from storage projects continued to 
be investigated. Nitrogen resulting from excessive 
discharge through spillways is having an undesirable 
effect on fish life. A consulting firm was retained to 
study this ecology problem. Regional low-water flow 
frequencies are being studied. 
Civil Works Investigations. Testing of a panel with a i'8- inch-thick epoxy mortar surface coating which was 
installed in the Detroit Test Conduit (ES 825) in June 
1969 was continued. After 234 hours of testing the 2:1 
epoxy on the left side of the panel had eroded to a 
depth of 3/4 inch. Complete failure of the surface on the 
left side terminated the test after a total time of 262 
hours. At this time the 3:2 epoxy on the right side 
showed no appreciable erosion. A second test panel 
with a 3/4-inch-thick epoxy mortar surface was 
installed and testing was begun on 30 July. The test 
program was terminated for the season on 12 September 
after a total test time on the second panel of 634 
hours. At termination of the test, erosion on the left side 
of the panel (3:2 epoxy) had reached a maximum 
depth of 1-1/2 inches and the right side (2:1 epoxy) had 
eroded to a maximum depth of 1/8 inch. No tests were 
conducted in the Detroit Test Chute (ES 826) during 
the year. Work performed consisted essentially of 
necessary maintenance and planning for future tests. 
Computer programs. Continued with the utilization of 
programs to make water resource system analysis, flood 
forecasting, flood routings, and derivation of design 
floods. Also, computation of horizontal and vertical 
control in survey work and earthwork design is a 
continuing program. The use a standard engineering 
systems used on the IBM 360 Model 50 installed at the 
North Pacific Division is continuing. In addition, 
Fortran programs have been written in the Engineering 
Division in the fields of Structures, Economic 
Studies, and Water Control. 
Total research and development costs were $82,593. 
1122

PORTLAND, OREG., DISTRICT 
TABLE 37-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project Funding FY67 FY68 FY69 FY70 Ji 
1. Chetco River New Work 
Oregon Approp. $ 30,000 $ 108,900 $ 876,000 $ 593,071 $ 
2. Columbia and Lower 
Willamette Rivers 
Below Vancouver, 
Wash., and Portland, 
Oreg. 
3. Columbia River at 
Baker Bay, Wash. 
4. Columbia River at 
The Mouth, Oregon 
and Washington 
5. Columbia River 
between Chinook 
Wash., and Head of 
Sand Island 
6. Columbia River 
Between Vancouver, 
Washington and The 
Dalles, Oregon 
7. Coos Bay, Oregon 
8. Coos and Millicoma 
Rivers, Oregon 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
7,621 
31,300 
22,153 
2,500,000 
1,760,637 
2,878,100 
2,885,286 
35,600 
20,684 
75,000 
64,515 
562,400 
620,431 
224,318 
16,268 
83,339 
92,935 
2,090,000 
2,808,950 
2,679,588 
2,776,926 
27,450 
46,299 
45,000 
59,904 
512,657 
546,310 
89,407 
619 1,102 
619 1,102 
-_- 
-_- 
119,200 
112,828 
7,200 
3,092 
338,000 
443,170 
812 
-85,762 
2,423 
109 
109 
109,668 
117,195 
1,833 
591,527 
618,360 
780,000 
755,927 
10,006 
10,006 
907,571 
47,000 
22,325 
1,954,000 
1,881,041 
2,309,100 
2,272,965 
104,000 
102,740 
65,187 
820,000 
813,751 
640,341 
144,096 
18,370 
1,440,000 
1,107,863 
2,230,135 
2,227,244 
88,936 
90,196 
2,000 
13,186 
670,473 
675,988 
3,917 
104,600 
101,422 
31,000 
28,078 
434 
736,000 
315,971 
-44,034 
-3 
17,000 
13,272 
-1,457 
-1,721 
214,313 
217,235 
20,000 
21,461 
1,467,883 
1,875,345 
11,293 
12,646 
Cost to 
une 30, 1970 
2,097,5251 
2,061,255 
459,870 
309,469 
22,091,0902,3 
21,399,6072,3 
64,803,3663,4 
64,754,2513,4 
941,252 
941,252 
1,038,910 
1,038,910 
16,977,2535 
16,952,4525 
23,324,3856 
23,323,6516 
4,054,000 
4,040,878 
220,283 
220,283 
299,141 
299,141 
84,930 
84,930 
6,004,7907 
6,004,790 
6,133,7308 
6,133,730 
8,906,2969,10 
8,905,917 
18,714,09611,12 
18,700,559" 
2,335,966 
2,335,966 
350,23813 
350,238 
150,806 
148,431 
1123

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 37-A (Cont'd) 
See 
Section 
in Text Project 
9. Coquille River, 
Oregon 
10. Cowlitz River, 
Washington 
11. Depoe Bay, Oregon 
12. Elochoman Slough, 
Washington 
13. Lewis River, 
Washington 
14. Rogue River Harbor 
at Gold Beach, 
Oregon 
15. Siuslaw River, 
Oregon 
16. Skipannon Channel, 
Oregon 
17. Tillamook Bay 
and Bar, Oregon 
I 
COST AND FINANCIAL STATEMENT 
Total to 
Funding FY67 FY68 FY69 FY70 June 30, 1970 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
24,400 
51,045 
180,000 
3,676 
15,000 
6,115 
862 
42,100 
26,468 
3,478 
98 
98 
58,700 
5,656 
128,100 
126,541 
135,783 
626,496 
1,053 
83,500 
93,919 
4,000 
3,290 
30,000 
1,888 
9,900 
23,780 
41,918 
45,807 
10,800 
144,552 
-9,809 
478 
-26,612 
-10,876 
7,782 
139 
236 
236 
1,800 
53,407 
155,412 
161,753 
1,100 
12,098 
98,660 
102,204 
24,142 
24,852 
20,917 
10,568 
13,219 
29,100 
23,359 
20,336 
77,916 
1,053 
1,053 
6,000 
903 
85,664 
1,635 
128 
128 
81,500 
10,474 
175,200 
143,686 
770,000 
490,185 
50,000 
48,160 
4,300 
4,101 
500,000 
106,888 
7,000 
5,888 
45,030 
50,771 
5,365 
5,365 
7,653 
12,750 
100,000 
9,989 
114 
114 
19,205 
91,690 
100,000 
171,401 
202,183 
-28,000 
107,916 
32,605 
34,825 
5,396 
3,795 
2,070,000 
1,875,968 
19,741 
20,853 
1124 
$ 657,36614 
657,36614 
1,909,06415,16 
1,909,06415,16 
277,43617 
277,4361 
618,1238 
618,123 
512,95219 
512,95219 
229,158 
229,158 
224,89920,21 
46,68620,21 
22,378 
22,378 
58,1322223 
58,132 
373,373 
373,373 
3,953,439 
3,853,439 
1,037,613 
1,036,881 
635,783 
635,783 
1,289,68924 
1,145,40824 
1,523,11425,26 
1,523,11425 
879,285 
879,285 
280,854 
280,854 
397,353 
395,553 
4,407,55927,28 
3,813,22027 
1,404,21229 
1,404,21229

TABLE 37-A (Cont'd) 
See 
Section 
in Text Project Funding 
17. Tillamook Bay Rehab. 
and Bar, Oregon Approp. 
(Cont'd) Cost 
18. Umpqua River, New Work 
Oregon Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
19. Willamette River New Work. 
Above Portland Approp. 
and Yamhill River, Cost 
Oregon Maint. 
Approp. 
Cost 
20. Willamette River New Work 
at Willamette Falls, Approp. 
Oregon Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
21. Yaquina Bay and New Work 
Harbor, Oregon Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
22. Yaquina River, New Work 
Oregon Approp. 
Cost 
Maint. 
Approp. 
Cost 
27. Applegate Lake, New Work 
Rogue River Basin, Approp. 
Oregon Cost 
28. Blue River New Work 
Lake, Oregon Approp. 
Cost 
Maint. 
Approp. 
Cost 
29. Cascadia Lake, New Work 
Oregon Approp. 
Cost 
30. Cottage Grove Lake, New Work 
Oregon Approp. 
Cost 
Maint. 
Approp. 
Cost 
PORTLAND, OREG., DISTRICT 
COST AND FINANCIAL STATEMENT 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
$ - $ -240,000 $ - $ 140,000 $ 2,888,000 
100,504 741 2,179 107,836 2,839,799 
- - - - 2,703,87730,31 
- - - - 2,703,8773o 
172,800 126,784 186,800 73,478 5,857,478 
202,982 134,246 183,101 77,177 5,857,478 
-34,338 - - - 2,500,677 
16,324 - - - 2,500,677 
- - - - 862,918 
- - - - 862,918 
576,600 403,292 367,300 567,704 14,999,8944 
555,859 216,334 596,304 573,543 14,999,699 
- - - - 520,00535 
- - - - 520,0053s 
217,700 292,300 350,000 439,124 6,493,11436 
210,695 303,168 198,445 424,173 6,301,901 
160,000 - -10,606 - 234,794 
8,052 201,762 - - 234,794 
1,670,000 1,855,600 291,000 -55,000 13,557,05937,38 
2,612,660 963,372 1,010,683 11,655 13,450,05637 
236,300 268,029 416,200 385,119 5,016,39539 
228,124 278,742 410,728 390,591 5,016,39539 
- - - - 20,000 
- - 5,153 168 12,005 
- 163,400 - - 224,90040 
3,084 156,902 -6,682 651 200,50540 
9,000 -925 101,346 -10,382 363,44241 
7,950 125 70,932 19,328 362,73841 
200,000 206,000 - - 730,000 
197,284 144,158 77,840 23,874 720,436 
8,000,000 6,021,800 1,991,000 - 28,991,00042 
8,241,613 6,287,947 1,630,885 306,521 28,705,06042 
- - - 64,098 64,098 
- - - 61,898 61,898 
200,000 300,000 234,000 89,200 994,20043 
137,184 216,235 308,916 149,061 980,64143 
22,000 - - 30,000 2,613,927 
157,077 4,549 -1,101 7,452 2,589,935 
78,000 92,046 107,700 104,949 1,302,110 
87,733 95,154 91,202 117,693 1,297,968 
1125

TABLE 37-A (Cont'd) 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project Funding 
31. Cowlitz County New Work 
Consolidated Approp. 
Diking Improvement Cost 
District No. 2, 
Washington 
32. Dorena Lake, New Work 
Oregon Approp. 
Cost 
Maint. 
Approp. 
Cost 
33. Elk Creek Lake, New Work 
Rogue River Basin, Approp. 
Oreg. Cost 
34. Fall Creek New Work 
Lake, Oregon Approp. 
Cost 
Maint. 
Approp. 
Cost 
35. Fern Ridge Lake, New Work 
Oregon Approp. 
Cost 
Maint. 
Approp. 
Cost 
36. Gate Creek Lake, New Work 
Oregon Approp. 
Cost 
38. Lower Columbia R. New Work 
Basin Bank Approp. 
Protection Works, Cost 
Oreg. and Wash. 
39. Midland Drainage New Work 
District, Oreg. Approp. 
Cost 
40. Reedsport Levees, New Work 
Umpqua River, Oreg. Approp. 
Cost 
41. Scappose Drainage New Work 
District, Oreg. Approp. 
Cost 
42. Wahkiakum County New Work 
Consolidated Diking Approp. 
District No. 1, Cost 
Wash. 
43. Wahkiakum County New Work 
Diking District Approp. 
No. 4, Wash. Cost 
44. Washougal Area New Work 
Levee, Clark County Approp. 
Wash. Cost 
46. Willamette River New Work 
Basin, Oreg. (Bank Approp. 
Protection) Cost 
Maint 
Approp. 
Cost 
Total to 
FY67 FY68 FY69 FY70 June 30, 1970 
$ 466,000 $ 525,000 $ 377,308 $ -251,000 
97,229 305,441 521,978 180,497 
142,000 
57,458 
82,000 
72,210 
150,000 
127,764 
150,000 
602,947 
90,000 
79,831 
20,000 
138,987 
284,600 
271,339 
195,000 
101,693 
480,563 
551,323 
8,400 
226,456 
104,619 
105,066 
14,369 
396 
35,000 
26,459 
-1,237 
74,205 
500,000 
382,793 
200,000 
83,214 
52,031 
74,022 
220,000 
211,110 
50,000 
75,571 
87,539 
97,000 
7,905 
85,583 
110,198 
159,000 
167,887 
-35,000 
337,327 
2,841 
65,000 
54,178 
2,789 
506 
8,803 
30,000 
7,645 
343,000 
476,036 
47,600 -13,800 
33,211 18,341 
61,952 
93,800 
67,715 
146,000 
188,219 
104,000 
112,254 
117,900 
109,061 
350,000 
29,349 
206,000 
158,211 
226,000 
249,321 
388,000 
205,062 
7,500 
1,409 
500,000 
323,387 
29,000 
7,805 
72 
85 
100,000 
20,798 
365,000 
366,954 
38,900 
29,853 
110,313 
79,387 
81,020 
17,000 
21,229 
-75,000 
24,351 
96,026 
105,402 
449,000 
371,134 
111,924 
160,019 
50,000 
111,576 
400,000 
81,673 
5,705 
2,491 
250,405 
445,110 
20,139 
39,998 
308 
118 
3,022 
500,000 
252,220 
410 
13,395 
$ 1,251,808 
1,204,934 
14,015,43945 
13,986,3584s 
1,064,933 
1,039,389 
737,000 
735,052 
21,092,000 
21,066,978 
391,465 
391,294 
6,008,9626 
5,603,03746 
2,271,20347 
2,270,852 
800,000 
799,066 
4,163,463 
3,631,748 
304,511 
294,087
49 
968,716 
959,86349 
69,139 
66,119 
111,808 
105,997 
50,000 
48,566 
1,849,295 
1,746,667 
13,120,42450 
12,871,19150 
1,801,160 
1,800,255 
1126

TABLE 37-A (Cont'd) 
PORTLAND, OREG., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
51. Bonneville Lock and New Work 
Dam, Oreg. and Wash. 
52. Cougar Lake, Oreg. 
53. Detroit Lake, Oreg. 
54. Green Peter-Foster 
Lakes, Oreg. 
55. Hills Creek 
Lake, Oreg. 
56. Lookout Point Lake, 
Oreg. 
57. Lost Creek Lake, 
Rogue River 
Basin, Oreg. 
58. The Dalles Lock and 
Dam, Wash, and Oreg. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
$ 6,750 
92,480 
1,822,400 
1,677,498 
76,000 
53,187 
285,300- 
247,888 
$ 530,000 
537,263 
1,698,900 
1,877,717 
-30,000 
57,527 
$ 770,000 
727,180 
1,856,100 
1,607,782 
4,629 
220,200 230,200 
281,135 223,774 
447,200 
446,074 
10,606 
922 
856,000 
877,430 
408,200 
407,677 
456,600 431,700 
478,568 479,329 
173,079 100 
12,140,000 2,994,600 
12,482,418 3,008,356 
- 299,800 
- 291,088 
132,600 121,300 
130,081 132,805 
- 75,000 
31 11,087 
414,700 464,900 
494,586 528,742 
545,000 2,090,000 
281,789 2,290,114 
674,000 
223,505 
$ 994,000 
999,995 
2,078,261 
2,125,487 
35,000 
13,416 
184,470 
197,102 
510,260 
512,840 
4,446 
200,429 
524,041 
576,166 
579,493 
142,900 273,949 
141,213 273,169 
15,000 
69,868 
599,800 
511,827 
1,940,000 
1,464,406 
-4,000 
1,600 
707,202 
712,823 
3,650,000 
2,511,599 
$ 85,750,14551 
85,599,87051 
41,985,50052,53 
41,741,72052, 
5 3 
53,289,41454 
53,259,73554 
1,498,570 
1,497,394 
62,729,698 
62,729,698 
7,437,338 
7,422,184 
332,206 
262,024 
81,406,0005s 
81,237,512 s s 
1,284,166 
1,278,258 
45,700,619 
45,700,619 
1,258,649 
1,253,133 
87,937,48456 
87,932,84756 
7,542,502 
7,426,549 
9,135,000 
7,445,631 
546,000 7,509,000 3,990,000 259,867,32157 
829,664 3,727,664 6,338,981 258,160,231 
1,398,800 1,196,000 1,186,300 1,416,786 
1,469,320 1,262,260 1,194,359 1,446,149 
17,164,986 
17,152,222 
1. Excludes $14,800 contributed funds for new work. 
2. Includes $1,529,413 for previous project. Excludes 
$223,026 expended from contributed funds prior to 1964. 
3. Excludes $369,000 contributed by Port of Portland and 
$14,792 by Port of Vancouver, paid prior to commencement of 
dredging of 40-foot and 35-foot channel authorization. Also 
excludes $31,636 contributed by City of Astoria and Bumble 
Bee Sea Foods, Astoria, Oregon for disposal of dredged material. 
(not part of project cost.) 
4. Includes $150,955 allotted from deferred maintenance 
funds, Code 700, and $62,296 for public works accelerated 
program repair. Excludes $24,320 expended from contributed 
funds prior to 1964. 
5. Includes $1,986,253 for previous project and $4,000 
allotted under code 711, recreation facilities at completed 
project. Excludes $500,000 contributed funds. 
6. Includes $2,186,000 for previous project and $1,188,625 
allotted under deferred maintenance, Code 700. 
7. Includes funds allotted under Code 721 (Small authorized 
projects) $30,393 - Entrance to Oregon Slough; 161,897 
Camas-Washougal Turning Basin; $227,908 - Hood River Small 
Boat Basin; $157,470 - Bingen, Wash., Barge Channel; and 
$140,619 - The Dalles Small Boat Basin; and $15,281 allotted 
under Sec. 107 - Barge Channel under Interstate Bridge. 
8. Includes $2,033,408 allotted under Code 700 (Deferred 
Maintenance). 
1127

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COST AND FINANCIAL STATEMENT 
9. Includes $802,096 for previous project. Excludes 
$43,513 expended from contributed funds. 
10. Includes $27,200 allotted under Sec. 107. 
11. Includes $178,801 for previous project. Excludes $8,387 
expended from contributed funds. 
12. Includes $1,444,640 allotted under Code 700, Deferred 
Maintenance. 
13. Excludes $80,000 (other funds) contributed for new 
work by Port of Coos Bay to cover additional cost of disposing 
of dredge spoils in Coos Bay, Oregon. 
14. Includes $340,726 for previous project. Excludes 
$72,892 contributed funds expended for new work. 
15. Includes $41,467 for previous project. 
16. Includes $78,500 allotted under Code 700, Deferred 
Maintenance. 
17. Includes $4,999 for previous project. Also includes 
$239,529 Section 107 funds. 
18. Includes $48,184 for previous project. 
19. Includes $145,588 Section 107 funds. Excludes $42,000 
expended from contributed funds. 
20. Includes $206,258 allotted under Section 107, Cathlamet, 
Wash. 
21. Excludes $10,800 contributed funds and $60,000 (other 
funds) contributed for additional dredging by Port of Cathlamet. 
22. Includes $22,252 for previous project. 
23. Includes $8,098 for previous project. 
24. Excludes $151,701 for previous project. Excludes 
$322,532 expended from contributed funds. 
25. Includes $10,611 for previous project. 
26. Includes $188,000 allotted under Code 700, Deferred 
Maintenance. 
27. Includes $77,209 for previous project. Excludes 
$592,622 expended from contributed funds. 
28. Includes $57,767 allotted under Code 720 (Small Authorized 
Projects) Garibaldi Boat Basin. 
29. Includes $71,498 for previous project. Excludes $6,450 
expended from contributed funds. 
30. Includes $39,242 for previous project. Excludes 
$276,500 contributed funds. 
31. Includes $58,824 allotted under Code 720 (Small Authorized 
Projects) Winchester Bay, and Schofield River, Oregon. 
32. Includes $247,748 for previous project. 
33. Excludes $484,900 Emergency Relief Administration 
flood control funds for bank protection. 
34. Includes $51,500 allotted from deferred maintenance 
funds Code 700, and $35,935 for Public Works Acceleration 
program repair. In addition $7,500 for maintenance was expended 
from contributed funds and $246,637 on operating and 
care of improvements under provisions of permanent indefinite 
appropriation. 
35. Excludes $300,000 contributed funds. 
36. Includes $452,110 expended on operation and care from 
permanent indefinite appropriation and $150,000 allotted under 
maintenance and operation of dams and other improvements of 
navigable waters. 
37. Includes $707,313 for previous project and $170,000 
appropriated from public works acceleration program for north 
jetty rehabilitation. 
38. Excludes $729,168 contributed funds. 
39. Includes $6,026 for previous project. 
40. Includes $196,100 Section 107 funds. Excludes $50,400 
contributed funds. 
41. Includes $3,000 contributed funds. 
42. Includes $96,000 pro rata share of site selection costs in 
lieu of Quartz Creek Lake. 
43. Includes $112,000 pro rata share of site selection costs in 
lieu of Sweet Home Lake. 
44. Includes $240,633 allotted under Code 711, recreation 
facilities at completed project. 
45. Includes $485,967 allotted under Code 711, recreation 
facilities at completed project. 
46. Includes $582,700 allotted under Code 711 and 
$794,000 allotted under Code 712, recreation facilities at 
completed project and $136,482 allotted under Code 721 (small 
authorized project) reservoir modification. 
47. Includes $9,750 allotted under Code 700, deferred 
maintenance. 
48. Includes $95,000 pro rata share of site selection in lieu of 
Quartz Creek Lake. 
49. Excludes $230,070 contributed funds for new work and 
$31,284 Government furnished sheet steel pile. 
50. Excludes $77,469 contributed funds. 
51. Includes $12,200,000 Public Works Administration funds 
and $20,240,700 National Recovery Act funds, and also includes 
$296,750 allotted under Code 711, recreation facilities at 
completed project. 
52. Includes $383,000 modification for peaking funds and 
$1,831,000 second powerhouse funds. 
53. Includes $540,000 allotted from deferred maintenance 
funds, Code 700 and $450,000 allotted under maintenance and 
operation of dams and other improvements of navigable waters. 
54. Includes $96,000 pro rata share of site selection in lieu of 
Quartz Creek Lake. 
55. Includes $113,000 pro rata share of site selection costs in 
lieu of Sweet Home Lake. 
56. Includes $156,700 allotted under Code 711 recreation 
facilities at completed project. 
57. Includes $370,000 allotted under Code 712, and 
$122,000 allotted under Code 711, recreation facilities at 
completed project. 
1128 
TABLE 37-A (Cont'd)

PORTLAND, OREG., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Feb. 27, 1911 
July 25, 1912 
July 27, 1916 
Aug. 8, 1917 
Sept. 22, 1922 
Mar. 4,19232 
Mar. 3, 1925 
Mar. 3, 1927 
July 3, 1930 
Sept. 6, 19333 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 26, 1937 
Aug. 26, 1937 
Mar. 2, 1945 
Mar. 2, 1945 
July 24, 1946 
Oct. 23, 1962 
Oct. 23, 1962 
Dec. 11, 1933 
Aug. 30, 1935 
Mar. 2, 1945 
Mar 17, 1950 
1129 
TABLE 37-B 
COLUMBIA AND LOWER WILLIAMETTE RIVERS BELOW VANCOUVER, 
WASH., AND PORTLAND, OREG. (See Section 2 of Text) 
2 pipeline dredges and accessories H. Doc. 1278, 61st Cong., 3rd Sess. 1 
Increasing main channel to 30 feet. H. Doc. 1278, 61st Cong., 3rd Sess. 1 
Consolidating improvement below No Prior Report. 
Portland, Oreg., and between Vancouver, Wash., and Mouth 
of Willamette. 
For the Cathlamet channel. H. Doc. 120, 63rd Cong., 1st Sess. 1 
Construct an additional dredge (dredge was not built) and H. Doc. 1009, 66th Cong., 3rd Sess. 
accessories for better maintenance, and construct contraction 
works. 
Channel from deep water in Willamette Slough to deep water in H. Doc. 156, 67th Cong., 2nd Sess. 
Columbia River. 
Depth of 25 feet and width of 300 feet from mouth of H. Doc. 126, 68th Cong., 1st Sess. 
Willamette River to Vancouver, Wash. 
Closing east channel at Swan Island in Willamette River on Rivers and Harbors Committee 
condition that main channel to be opened to project Doc. 10, 69th Cong., 2nd Sess. 
dimensions on west side of island by Port of Portland. 
For a 35-foot channel 500 feet wide from Portland to the sea. H. Doc. 195, 70th Cong., 1st Sess. 
and Rivers and Harbors Committee 
Doc. 8, 71st Cong., 1st Sess. 1 
A channel 28 feet deep and 300 feet wide from mouth of H. Doc. 249, 72nd Cong., 2nd Sess.1 
Willamette River to Vancouver, with 2 turning basins, each 
generally 28 feet deep by 800 feet wide by 2,000 feet long. 
A channel in Columbia River from Mouth of Willamette to Rivers and Harbors Committee 
interstate highway bridge at Vancouver, Wash., 30 feet deep Doc. 1, 74th Cong., 1st Sess. 
and 300 feet wide, with 2 turning basins at Vancouver. 
Maintenance of not to exceed 35-foot depth at low water in Rivers and Harbors Committee 
Portland Harbor and Willamette River between its mouth and Doc. 6, 73rd Cong., 1st Sess. 1 
Broadway Bridge at Portland. 
Auxiliary channels, 30 feet deep, 300 feet and 500 H. Doc. 235, 72nd Cong., 1st Sess. 1 
feet at St Helens. 
Extension of lower turning basin at Vancouver, Wash., 1,000 Rivers and Harbors Committee 
feet downstream. Doc. 81, 74th Cong., 2nd Sess.1 
An auxiliary channel 24 feet deep and 200 feet wide along H. Doc. 203, 75th Cong., 1st Sess.1 
waterfront at Rainier, Oreg. 
Improvement of old mouth of Cowlitz River H. Doc. 341, 77th Cong., 1st Sess. 1 
An auxiliary channel in vicinity of Longview, Wash. H. Doc. 630, 77th Cong., 2nd Sess.1 
A small-boat mooring basin at Astoria, Oreg. H. Doc. 692, 79th Cong., 2nd Sess. 1 
A channel 35 feet deep and 500 feet wide from mouth of H. Doc. 203, 87th Cong., 1st Sess. 
Willamette River to interstate highway bridge at Vancouver, 
Wash., with 2 turning basins of same depth. 
A channel 40 feet deep and 600 feet wide from Vancouver, Wash., H. Doc. 452, 87th Cong., 2nd Sess.1 
to mouth of Columbia River; a turning basin at Vancouver, 
Wash., a turning basin at Longview, Wash., and a channel 40 
feet deep in Willamette River from mouth to Broadway Bridge 
which encompasses Portland Harbor area. 
COLUMBIA RIVER AT BAKER BAY, WASH.. (See Section 3 of Text) 
Main channel Public Works Administration 
Main channel H. Doc 44, 73rd Cong., 1st Sess. 
West channel 8 feet deep H. Doc. 443, 76th Cong., 1st Sess. 
West channel 10 feet deep and mooring basin with protecting S. Doc. 95, 81st Cong., 1st Sess. 
breakwaters. 
COLUMBIA RIVER AT THE MOUTH, OREG. AND WASH. (See Section 4 of 
Text) 
Extend South Jetty and construct North Jetty and dredging H. Doc. 94, 56th Cong., 1st Sess. 
Bar channel of 48-foot depth and spur jetty on north shore H. Doc. 249, 83rd Cong., 2nd Sess.1 
Mar. 3, 1905 
Sept. 3, 1954

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 37-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 20, 1938 
Sept. 3, 1954 
Aug. 26, 1937 
Mar. 2, 1945 
July 24, 1946 
July 24, 1946 
July 24, 1946 
July 24, 1946 
July 14, 1960 
June 25,1910 
Mar. 2, 1919 
Sept. 22, 1922 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 1935 
July 24, 1946 
June 30, 1948 
July 14, 1960 
June 25, 1910 
Mar. 2, 1919 
July 3, 1930 
Aug. 30, 1935 
Mar. 2, 1945 
Aug. 26, 1937 
1130 
COLUMBIA RIVER BETWEEN CHINOOK, WASH., AND HEAD OF SAND 
ISLAND (See Section 5 of Text) 
Channel 8 feet deep. Rivers and Harbors Committee Doc. 
50, 75th Cong., 2nd Sess. 
Channel 10 feet deep and mooring basin. S. Doc. 8, 83rd Cong., 1st Sess. 1 
COLUMBIA RIVER, BETWEEN VANCOUVER, WASH., AND THE DALLES, OREG. 
(See Section 6 of Text) 
Construct a channel 27 feet deep by 300 feet from Vancouver, H. Committee Doc. 94, 74th Cong., 
Wash., to Bonneville, Oreg. 2nd Sess. 1 
Construct Camas-Washougal turning basin. H. Doc. 218, 76th Cong., 1st Sess. 
Construct a channel 27 feet deep by 300 feet wide from H. Doc. 704, 79th Cong., 2nd Sess. 
Bonneville, Oreg., to The Dalles, Oreg. 
Construct a boat basin at Hood River, Oreg., 10 feet deep, H. Doc. 704, 79th Cong., 2nd Sess. 
500 feet wide, by 1,300 feet long. 
Construct a barge channel at Bingen, Wash., 10 feet deep, H. Doc. 704, 79th Cong., 2nd Sess. 
200 feet wide, by 1 mile long, and an access channel 7 feet 
deep, 100 feet wide, by 1,000 feet long to natural mooring 
basin. 
Construct The Dalles Harbor 8 feet deep, 400 feet wide by 800 S. Doc. 89, 79th Cong., 1st Sess. 1 
feet long. 
Construct alternate barge Channel 15 feet deep and 300 feet Sec. 107 - Approved Dec. 5, 1962 
wide, under wide span of Interstate Hwy. Bridge. 
COOS BAY, OREG. (See Section 7 of Text) 
Dredging the Ocean Bar Channel H. Doc. 958, 60th Cong., I1st Sess. 
A channel 22 feet deep to Smith's Mill H. Doc. 325, 65th Cong., 1st Sess. 
Restore North Jetty 9,600 feet long, construct a South Jetty H. Doc. 150, 67th Cong., 2nd Sess. 
about 3,900 feet long, extend 22-foot bay channel from 
Smith's Mill to Millington. 
Extend jetties to such lengths as may be practicable within 
estimate of total cost of jetties, $3,250,000 as given in 
H. Doc. 150, 67th Cong. 
A channel 24 feet deep and 300 feet wide, through Piegon Point H. Doc. 110, 70th Cong., 1st Sess. 1 
Reef, following a location along westerly side of bay. 
For 24-foot channel from Pigeon Point Reef to Smith's Mill S. Committee Print, 73rd Cong., 
and a turning basin above Marshfield. 2nd Sess. 1 
Increased dimensions of channel across bar and to Isthmus S. Doc. 253, 79th Cong., 2nd Sess. 
Slough and turning basin opposite Coalbank Slough and at City 
of North Bend; anchorage basins at mile 3.5 and near mile 7. 
A mooring basin and connecting channel at Charleston. H. Doc. 646, 80th Cong., 2nd Sess. 
Channel extension in South Slough near Charleston. Sec. 107 approved Oct. 1968 
COQUILLE RIVER, OREG. (See Section 9 of Text) 
Dredging shoals between mouth and Riverton, and removing H. Doc. 673, 61st Cong., 2nd Sess. 
obstruction between mouth of North Fork and Bandon. 
For a 13-foot channel from ocean to bandon. H. Doc. 207, 65th Cong., 1st Sess. 
Deepen channel to 16 feet between sea and eastern end of North H. Doc. 186, 70th Cong., 1st Sess. 1 
Jetty. 
Present project depth between sea and eastern end of North S. Committee Print, 74th Cong., 
Jetty. 1st Sess. 
For 13-foot depth from sea to a point 1 mile above Coquille H. Doc. 672, 76th Cong., 2nd Sess. 1 
River Lighthouse and snagging to State Highway Bridge. 
DEPOE BAY, OREG. (See Section 11 of Text) 
Construction of inner basin 375 feet long, 125 feet wide and H. Doc. 202, 75th Cong., 1st Sess. 
5 feet deep, with entrance channel of same depth and 30 feet 
wide.

TABLE 37-B (Cont'd) 
PORTLAND, OREG., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 2, 1945 
July 14, 1960 
June 25, 1920 
Mar. 3, 1925 
July 3, 1958 
July 3, 1930 
Aug. 26, 1937 
June 30, 1948 
July 26, 1912 
Mar. 4, 1913 
Mar. 2, 1919 
Mar. 3, 1925 
Mar. 2, 1945 
June 30, 1948 
Sept. 3, 1954 
Oct. 27, 1965 
Sept. 22, 1922 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 1935 
June 20, 1938 
Mar. 2, 1945 
Mar. 2, 1945 
June 30, 1948 
Sept. 3, 1954 
June 3, 1896 
June 3, 1896 
July 25, 1912 
July 3, 1930 
Construction of inner basin 750 feet long, 390 feet wide and 
8 feet deep, with entrance channel of same depth and 30 
feet wide. 
Construction of entrance channel 8 feet deep and 50 feet wide, 
concrete breakwater and stone spending beach. 
SIUSLAW RIVER, OREG. (See Sec. 15 of Text) 
Extension of jetties. 
12-foot deep channel. 
18-foot bar channel and 16-foot river channel 
SKIPANON CHANNEL, OREG. (See Sec. 16 of Text) 
Channel from deep water in Columbia River to railroad bridge. 
Channel extending upstream from railroad bridge a distance of 
4,500 feet. 
Mooring basin 12 feet deep at Warrenton. 
TILLAMOOK BAY AND BAR, OREG. (See Section 17 of Text) 
Construct North Jetty 5,700 feet long and dredging channel 16 
feet deep, 200 feet wide, to Bay City. 
Abandon that portion of project above Bay City 
Abandon Bay City Channel and present project dimension of 
channels and turning basins with regulating works as needed. 
Repair damage and check erosion on Bayocean Peninsula caused 
by storm Jan. 1939. 
Dredging small-boat basin and approach at Garibaldi, Oreg., to 
depth of 12 feet. 
Closure of breach in Bayocean Peninsula 
Construct South Jetty, 8,000 feet long. 
UMPQUA RIVER, OREG. (See Section 18 of Text) 
North Jetty, 7,500 feet long. 
Present project dimensions of North Jetty and dredging ocean 
bar. 
A short south jetty. 
A full length south jetty and maintenance dredging to a 26-foot 
length. 
Channel 22 feet deep and 200 feet wide from mouth to Reedsport. 
Channel 22 feet deep and 200 feet wide from river channel to 
Gardiner and turning basin 22 feet deep, 500 feet wide and 
800 feet long. 
Channel 10 feet deep and 100 feet wide from river channel to 
dock in Winchester Bay with mooring and turning basin 10 feet 
deep, 175 feet wide, and 300 feet long at inner end. 
Channel 12 feet deep and 100 feet wide from river channel to 
dock in Winchester Bay with mooring and turning basin 12 feet 
deep, 175 feet wide, and 300 feet long at inner end. 
Channel 12 feet deep, Scholfield River. 
WILLAMETTE RIVER ABOVE PORTLAND AND YAMHILL RIVER, OREG. 
(See Section 19 of Text) 
Improvement of Willamette River above Oregon City H. Doc. 260, 54th Cong., 1st Sess. 
(Annual Report, 1896, p. 3300). 
Improvement of Yamhill River by lock and dam construction. Annual Report, 1895, p. 3602. 
Project modified in 1904 by abandoning 20-mile stretch of river Annual Report, 1904, p. 3529. 
between Harrisburg and Eugene as unworthy of improvement. 
A 6-foot channel in Willamette River below Oregon City. H. Doc. 438, 62nd Cong., 2nd Sess. 
For 8-foot channel between Portland and Oregon City. H. Doc. 372, 71st Cong., 2nd Sess. 1 
1131 
H. Doc. 350, 77th Cong., 1st Sess. 1 
Sec. 107 approved Feb. 1965 
H. Doc. 648, 61st Cong., 2nd Sess. 
S. Committee Print, Serial, 68th 
Cong., 1st Sess. 
H. Doc. 204, 85th Cong., 1st Sess. 1 
H. Doc. 278, 70th Cong., 1st Sess. 1 
H. Doc. 201, 75th Cong., I1st Sess. 1 
S. Doc. 95, 81st Cong., 1st Sess. 1 
H. Doc. 349, 62nd Cong., 2nd Sess. 
H. Doc. 760, 65th Cong., 2nd Sess. 
H. Doc. 562, 68th Cong., 2nd Sess. 4 
S. Doc. 35, 79th Cong., 1st Sess.5 
H. Doc. 650, 80th Cong., 1st Sess. 
S. Doc. 128, 83rd Cong., 2nd Sess. 1 
S. Doc. 43, 89th Cong., 1st Sess. 1 
H. Doc. 913, 65th Cong., 2nd Sess. 
H. Doc. 320, 69th Cong., 1st Sess. 
H. Doc. 317, 70th Cong., 1st Sess. 1 
Rivers and Harbors Committee Doc. 
9, 72nd Cong., 1st Sess. 1 
S. Doc. 158, 75th Cong., 3rd Sess. 1 
S. Doc. 86, 76th Cong., 1st Sess. 1 
S. Doc. 191, 77th Cong., 2nd Sess. 1 
S. Doc. 154, 80th Cong., 2nd Sess. 1 
S. Doc. 133, 81st Cong., 2nd Sess. 1

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 37-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 26, 19346 
June 28, 19387 
Operating and care of lock and dam at Yamhill River and 
provided for with funds from War Department appropriations 
for rivers and harbors. 
Steamflow regulation with controlling depths of 6 feet to 
mouth of Santiam River and 5 feet to Albany with enlargement 
of locks at Oregon City. 
WILLAMETTE RIVER AT WILLAMETTE FALLS, OREG. (See Section 20 o 
Text) 
For purchase and rehabilitation of system and construction of 
concrete division wall. 
Deepening of locks. 
Operation and care of canal and locks provided for with funds 
from War Department appropriations for Rivers and Harbors. 
Construction of New Willamette Falls Lock. 
YAQUINA BAY AND HARBOR, OREG. (See Section 21 of Text) 
Restoration and extension of jetties constructed under previous 
projects, rock removal at entrance; and dredging in bay up 
to railroad terminus at Yaquina. 
Extension of north jetty seaward 1,000 feet. 
26-foot channel of suitable width across entrance bar, so far 
as rock bottom will allow, a 20-foot channel 300 feet wide 
along south side of bay to and including a turning basin 22 
feet deep, 1,000 feet wide and 1,200 feet long. 
Construct a small-boat mooring basin at Newport, Oreg. 
40-foot bar channel and 30-foot river channel and extension of 
jetties at entrance. 
BONNEVILLE LOCK AND DAM, OREG. AND WASH. (BONNEVILLE LAKE) 
(See Section 51 of Text) 
Existing project was originally authorized Sept. 30, 1933, by 
Federal Emergency Administration of Public Works. 
Existing project authorized by Congress. S. Committee Print, 73rd Cong., 
2nd Sess., (Report of Chief of 
Engineers Date Aug. 21, 1938). 
Completion, maintenance, and operation of Bonneville Project 
under direction of Secretary of War and supervision of Chief 
of Engineers, subject to certain provisions therein relating 
to powers and duties of Bonneville Power Administrator. 
1. Contains latest published maps. 
2. Public Resolution 105, 67th Cong. 
3. Public Works Administration. 
4. Includes following work, classified inactive. A channel to 
Hobsonville 200 feet wide and 16 feet deep, with a turning basin 
500 feet wide at Hobsonville, and regulating works as needed. 
5. Inactive. 
6. Flood Control Act. 
7. Permanent Appropriations Repeal Act. 
1132 
H. Doc. 544, 75th Cong., 3rd Sess. 
f
H. Doc. 202, 56th Cong., 1st Sess. 
and Annual Report, 1900, p. 4374. 
H. Doc. 1060, 62nd Cong., 3rd Sess. 1 
H. Doc. 544, 75th Cong., 3rd Sess. 
H. Doc. 109, 65th Cong., 1st Sess. 
S. Committee Print, 75th Cong., 
1st Sess. 1 
S. Doc. 119, 77th Cong., 1st Sess. 1 
S. Doc. 246, 79th Cong., 2nd Sess. 
S. Doc. 8, 85th Cong., 1st Sess. 1 
June 25, 1910 
Aug. 8, 1917 
June 26, 19347 
Mar. 2, 1945 
Mar. 2, 1919 
Aug. 26, 1937 
Mar. 2, 1945 
July 24, 1946 
July 3, 1958 
Aug. 30, 1935 
Aug. 30, 1937

PORTLAND, OREG., DISTRICT 
TABLE 37-C COLUMBIA AND LOWER WILLAMETTE RIVER BELOW 
VANCOUVER, WASH., AND PORTLAND, OREG. 
TOTAL COST OF EXISTING PROJECT TO JUNE 30, 1971 
(See Section 2 of Text) 
Funds New Work Maintenance Total 
Regular $19,285,449 $63,426,205 $82,711,654 
Public Works 446,296 14,515 460,811 
Emergency Relief Administration 138,449 98,668 237,117 
Total U.S. 19,870,194 63,539,388 83,409,582 
Contributed Prior to 1964 223,026 24,320 247,346 
Do(1964) 35 and 40-foot channel 272,771 - 272,771 
Total Contributed 495,797 24,320 520,117 
Total All Funds 20,365,991 63,563,708 83,929,699 
TABLE 37-D WILLAMETTE RIVER AT WILLAMETTE FALLS, OREG. 
PRINCIPAL FEATURES OF EXISTING CANAL AND LOCKS 
(See Section 20 of Text) 
Usable Lock Dimensions Series of 4 locks, each 175 by 37 feet 1 
Lift of Each Lock Lock 1 (Lower), 22.5 feet; Lock 2, 8.7 feet; 
Lock 3, 10.9 feety Lock 4 (Upper), 8.1 
feet 2 
Depth on Miter Sills at Low Water Lower Lock, 8.4 feet; Upper Lock, 6 feet. 
Character of Foundation Rock 
Kind of Dam Fixed.3 
Type of Construction Concrete. 
Year of Completion 1873; Purchased by United States Apr. 26, 1915. 
Cost Unknown; purchase price, $375,000. 
1. A guard lock 210 by 40 feet, which is used only at higher 
stages of water, is at upper end of canal basin. 
2. A concrete division wall, 1,227 feet long, extending from 
Lock 4 to Guard Lock, separates upper basin of canal from head 
race, which formerly led directly from basin and supplied water 
for powerplants operated by Crown Zellerbach Corp., and 
Portland Ry., Light & Power Co., which is now being operated 
by Portland General Electric Co. 
3. The dam is owned by private parties. 
1133 
451-584 0-72-72

REPORT OF THE CHIEF OF ENGINEERS. U.S. ARMY 1970 
TABLE 37-E OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Clatskanie River, Oreg.1 1969 $ 19,2403 $ 185,4294 
Columbia Slough, Oreg.5 1953 - 1,054 
Deep River, Wash. 1 '2 1963 15,384 46,472 
Grays River, Wash. 1'2 1941 2,500 9,574 
Lake River, Wash. 1' 2 1965 2,700 28,575 
Multnomah Channel, Oreg.1 ',2 1949 18,112 2,252 
Nehalem Bay, Oreg.1,2 1955 302,0066 27,534 
Oregon Slough (North Portland Harbor) Oreg. 1 
,2 1963 16,881 96,446 
Port Orford, Oreg.1 1969 758,6927 2,515 
Salmon River, Oreg.1 ,2 1949 2,145 501 
Skamokawa Creek, Wash.1 1969 2,400 82,593 
Skamokawa (Steamboat Slough), Wash. s 1932 
Smith River, Oreg.1 1966 143,120 60,641 
The Cascades Canal, Columbia River, Oreg.1 8 1939 3,903,780 559,858 
The Dalles-Celilo Canal, Oreg. and Wash. 1 ,9 1957 4,716,205 2,833,888 
Westport Slough, Oreg.2 1966 16,276 179,405 
Youngs Bay and River, Oreg. 1 ,2 1968 9,348 49,622 
1. Completed. 6. Excludes $304,826 contributed funds for new work. 
2. Channel adequate for present commerce. 7. Excludes $9,900 contributed funds for new work. 
3. Includes $15,537 for previous project. 8. Project abandoned due to flooding by Bonneville Dam 
4. Includes $23,489 for previous project. Pool. 
5. Classified inactive. 9. Project abandoned due to flooding by the Dalles Dam 
Pool. 
TABLE 37-F RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 25 of Text) 
Name of Project Date Survey Conducted 
Oregon Slough, Oregon October 1969 
Multnomah Channel, Oregon October 1969 
Lake River, Washington January-February 1970 
Clatskanie River, Oregon February 1970 
Wesport Slough, Oregon March 1970 
Elokomin Slough, Washington June 1970 
Skanokawa Creek, Washington February 1970 
Grays River, Washington June 1970 
Deep River, Washington June 1970 
Youngs Bay & River, Oregon November-December 
1969 
Col. R. between Chinook, Washington February-March 1970 
& Head of Sand Island 
Nehalem Bay, Oregon June 1970 
Port Orford, Oregon January-February- 
April 1970 
Salmon River, Oregon (None) 
Smith River, Oregon June 1970 
1134

PORTLAND, OREG., DISTRICT 
TABLE 37-G NAVIGATION WORK UNDER SPECIAL AUTHORIZATION 
(See Section 25 of Text) 
Study Identification Fiscal Year Costs 
Study Identification: 
Alsea Bay and River, Oreg., small boat basin1 $ 1,011 
Beaver Slough, Oreg., channel improvement2 1,365 
Columbia and Lower Willamette River, Oreg., 
Hammond Small boat basin 2,844 
Grays River, Wash., Channel improvement 254 
Lewis and Clark Connecting Channel, Oreg.3 1,971 
Yaquira Bay and Bar, Oreg., small boat basin 2,243 
Total 9,688 
1. Preliminary Report Approved October 12, 1965. 
2. Preliminary Report Approved August 17, 1964. 
3. Preliminary Report Approved October 19, 1964. 
TABLE 37-H OTHER AUTHORIZED BRIDGE ALTERATIONS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Bridges across Columbia River at Cascade 
Locks and Hood River, Oreg.1 1944 $ 1,081,806 $ 
Interstate Bridge, Columbia River, Portland, 
Oreg. to Vancouver, Wash.' 1961 1,154,1622 
1. Completed 
2. Non-Federal Funds $1,204,100 
1135

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 37-I FLOOD CONTROL RESERVOIR OPERATIONS 
See 
Section Peak Inflow Storage Used 
in Text Project Date of Peak Inflow cu.ft./sec. acre/feet 
28. Blue River Lake, December 21, 1969 5,300 16,000 
Oreg. January 17, 1970 6,500 29,000 
January 23, 1970 7,000 41,000 
30. Cottage Grove Lake, December 21, 1969 6,900 11,000 
Oreg. January 18, 1970 2,200 9,000 
January 23, 1970 5,200 75,000 
32. Dorena Lake, December 21, 1969 14,600 35,000 
Oreg. January 18, 1970 7,000 28,000 
January 23, 1970 13,300 50,000 
34. Fall Creek Lake, December 21, 1969 7,100 18,000 
Oreg. January 18, 1970 6,500 22,400 
January 23, 1970 7,800 61,000 
35. Fern Ridge Lake, December 21, 1969 5,100 24,700 
Oreg. January 18, 1970 5,200 13,800 
January 26, 1970 13,500 80,000 
52. Cougar Lake, December 21, 1969 5,910 19,000 
Oreg. January 18, 1970 7,015 34,000 
January 22, 1970 8,170 74,000 
53. Detroit Lake, December 21, 1969 13,425 40,000 
Oreg. January 18, 1970 20,310 106,000 
January 23, 1970 23,030 168,000 
54. Green Peter Lake, December 21, 1969 11,750 29,000 
Oreg. January 18, 1970 21,330 90,000 
January 23, 1970 16,090 108,000 
55. Hills Creek Lake, December 21, 1969 12,950 31,000 
Oreg. January 18, 1970 9,030 44,000 
January 22, 1970 13,150 186,000 
56. Lookout Point Lake, December 21, 1969 15,770 81,000 
Oreg. January 18, 1970 15,165 77,000 
January 22, 1970 19,575 166,000 
1136

PORTLAND, OREG., DISTRICT 
TABLE 37-J WILLAMETTE RIVER BASIN COMPREHENSIVE PLAN 
(See Section 45 of Text) 
Project 
Blue River Lake, McKenzie Basin 1,3 
Cascadia Lake, South Santiam Riverl1,4 
Channel Clearing and Snagging on Willamette 
River and Major Tributaries 
Channel Improvements for Flood Control and 
Major Drainage on 16 Streams 
Tributary to Willamette River1,7 
Cottage Grove Lake, Coast Fork1 
Cougar Lake, South Fork McKenzie 1 , 3 
Detroit Lake, Including Big Cliff 
Lake, North Santiam River1 
Dorena Lake, Row River1 
Fall Creek Lake, Middle Fork1 
Fern Ridge Lake, Long Tom River1 
Floodwall Levees, Portland, Oreg.6 
Gate Creek Lake, McKenzie Basin3 
Green Peter-Foster Lakes, Middle Santiaml , 4 
Hills Creek Lake, Middle Fork 
Holley Lake, Calapooya River5 
Johnson Creek, Vicinity of Portland, Oreg. 6 
Lookout Point Lake Including Dexter 
Lake, Middle Fork' 
Strube Lake & Cougar Additional Power, 
South Fork McKenzie 
Waldo Lake Tunnel and Reregulating Works 
North Fork, Middle Fork, Willamette River 
Willamette Falls Fish Ladder6 
Willamette River Bank Protection1 
1137 
Estimated 
Federal 
Cost-1970 
$30,100,000 
54,800,000 
3,005,000 
1,214,300 
Authorizing Act 
May 17, 1950, H.Doc. 531, 
81st Cong. 
Oct. 23, 1962, H. Doc. 403, 
87th Cong., 2nd Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2nd Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2nd Sess. 
June 28, 1938, H. Doc. 544, 
75th Cong., 3rd Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2nd Sess. and 
Sept. 3, 1954, S. Doc. 131, 
83rd Cong., 2nd Sess. 
June 28, 1938, H. Doc. 544, 
75th Cong., 3rd Sess. and 
June 30, 1948, Public Law 
858. 
June 28, 1938, H. Doc. 544, 
75th Cong., 3rd Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2nd Sess. 
June 28, 1938, H. Doc. 544, 
75th Cong., 3rd Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2nd Sess. 
Oct. 23, 1962, H. Doc. 403, 
87th Cong., 2nd Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2nd Sess. and 
Sept. 3, 1954, S. Doc. 131, 
83rd Cong., 2nd Sess. and 
July 14, 1960, S. Doc. 104, 
86th Cong., 2nd Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2nd Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2nd Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2nd Sess. 
June 28, 1938, H. Doc. 544, 
75th Cong., 3rd Sess., and 
May 17, 1950, H. Doc. 
531, 81st Cong., 2nd Sess. 
Oct. 23, 1962, H. Doc. 403, 
87th Cong., 2nd Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2nd Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2nd Sess. 
June 22, 1936, Special 
Report Division Engr., 
June 28, 1938, H. Doc. 
544, 75th Cong., 3rd Sess., 
and May 17, 1950, H. Doc. 
531, 81st Cong., 2nd Sess. 
45,700,619 
13,300,000 
772,000 
88,713,800 
23,700,000 
8 
214,000 
13,350,000 
3,212,300 
54,700,000 
62,729,6982 
14,649,500 
21,799,000 
8,968,300 
18,900,000 
39,800,000 
83,820,000

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
WILLAMETTE RIVER BASIN COMPREHENSIVE PLAN 
(See Section 45 of Text) 
1. See individual reports for details of the project. 
2. Actual cost. 
3. For construction in lieu of originally authorized Quartz 
Creek Lake. 
4. For construction in lieu of originally authorized Sweet 
Home Lake. 
TABLE 37-K 
5. Project deferred for restudy. 
6. Project reclassified inactive. 
7. Does not include $25,075,000 Reclassified Locations. 
8. Authorization rescinded August 28, 1958, Public Law 
85-820. 
LOWER COLUMBIA RIVER BASIN, OREG. AND WASH. 
LEVEES AND IMPROVEMENTS TO EXISTING WORKS 
(See Section 37 of Text) 
Estimated Cost 
of Work 
Location Approved 1970 
Beaver Drainage District, Oreg. 
Cowlitz County Diking Improvement District 2, Wash. 
Cowlitz County Diking Improvement District 13, Wash. 
Cowlitz County Diking Imrpovement District 15, Wash. 
Cowlitz County Consolidated Diking Improvement District 2, Wash. 
Midland Drainage District, Oreg. 
Multnomah County Drainage District 1, Oreg. 
Peninsula Drainage District 1, Oreg. 
Rainier Drainage District, Oreg. 
Sandy Drainage District, Oreg. 
Sauvie Island Drainage District, Oreg. 
Scappoose Drainage District, Oreg. 
Wahkiakum County Consolidated Diking District 1, Wash. 
Wahkiakum County Diking District 4, Wash. 
Woodson Drainage District, Oreg. 
Total Estimated Cost, Federal Funds 
Estimated Non-Federal Cost 
Locations reclassified inactive or deferred and excluded from above cost estimate: 
Bachelor Island, Wash. 
Clatsop County Drainage District 1, Oreg. 
Clatsop County Diking District 4, Oreg. 
Clatsop County Diking District 6, Oreg. 
Columbia Drainage District 1, Oreg. 
Cowlitz County Consolidated Diking Improvement District 1, Wash. 
Deer Island Drainage District, Oreg. 
John Drainage District, Oreg. 
Lake River Delta Area, Wash. 
Lewis River Area, Wash. 
Magruder Drainage District, Oreg. 
Peninsula Drainage District No. 2, Oreg. 
Clatskanie Drainage District, Oreg. 
Cost of These Locations Is 
$ 1,150,000 
363,000 
65,352 
304,791 
1,503,000 
305,000 
1,49 2,000 
2,050,000 
594,000 
15,0561 
671,000 
2,130,000 
2,330,000 
675,000 
162,500 
13,810,699 
2,435,000 
1,040,000(1955) 
22,000(1959) 
56,000(1956) 
61,000(1960) 
1,192,000(1954) 
1,570,000(1960) 
547,000(1960) 
151,000(1960) 
1,110,000(1957) 
903,000(1954) 
77,000 
496,000(1960) 
574,000(1963) 
7,799,000 
1. Cost is for Engineering only. Project was constructed by local interests. 
1138 
TABLE 37-J (Cont'd)

TABLE 37-L 
Project 
COLUMBIA RIVER BASIN 
Beaver Drainage District, Columbia County, 
Oreg.1 
Blind Slough Diking District, Clatsop County, 
Oreg. 1 
Consolidated Diking and Improvement District 1, 
Cowlitz County, Wash.' 
Deep River area, Wahkiakum County, Wash.1 
Deer Island area, Columbia County, Oreg.1 
Diking District 2, Clatsop County, Oreg.1 
Diking District 3, Clatsop County, Oreg.2 
Diking District 5, Clatsop County, Oreg. 1 
Diking and Improvement District 5, Cowlitz 
County, Wash.1 
Diking District 1 and 3 (Puget Island) and 
Little Island, Wahkiakum County, Wash. 1 
Diking Improvement District 1, Pacific County, 
Wash.1 
Diking and Improvement District 4, Wahkiakum 
County, Wash.' 
Drainage District 1, Clatsop County, Oreg.1 
John Day River area, Clatsop County, Oreg.1 
Karlson Island, Clatsop County, Oreg.1 
Knappa area, Clatsop County, Oreg.1 
Lewis and Clark River area, Clatsop County, 
Oreg. 1 
Magruder Drainage District, Columbia County, 
Oreg. 1 
Marshland Drainage District, Columbia County, 
Oreg. 1 
Midland Drainage District, Columbia County, 
Oreg. 1 
Multnomah Drainage District 1, Oreg.1 
Peninsula Drainage District 1, Multnomah 
County, Oreg. 1 
Peninsula Drainage District 2, Multnomah 
County, Oreg.1 
Prescott area, Columbia County, Oreg. 2 
Rainier Drainage District, Columbia County, 
Oreg.1 
Sandy Drainage District, Multnomah County, 
Oreg.1 
Sauvie Island areas A and B, Multnomah 
County, Oreg.' 
Scappoose Drainage District, Columbia County, 
Oreg.
1 
Skamokawa Creek area, Wahkiakum County, Wash. 1 
Tenasillahe Island, Clatsop County, Oreg. 1 
Upper Grays River area, Wash.1 
Walluski River, Clatsop County, Oreg.1 
Warrenton Diking District 1, Clatsop County, 
Oreg.1 
PORTLAND, OREG., DISTRICT 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Report for Construction Maintenance 
1940 
1939 
1941 
1942 
1943 
1940 
1938 
1940 
1940 
1941 
1941 
1951 
1939 
1942 
1941 
1942 
1942 
1940 
1940 
1939 
1951 
1942 
1942 
1941 
1942 
1942 
1951 
1942 
1946 
1939 
1947 
1942 
1940 
$ 274,578 
163,397 
163,291 
69,724 
574,123 
43,150 
258 
25,609 
161,381 
258,795 
26,810 
169,542 
240,939 
33,080 
25,773 
18,789 
158,419 
61,186 
39,475 
77,7743 
585,6524 
211,160 
241,148 
125 
47,662 
138,956 
1,623,505 
424,310 
178,885 
133,778 
61,263 
66,932 
69,503 
30,000 
1139

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 37-L (Cont'd) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Warrenton Diking District 2, Clatsop County, 
Oreg.1 1940 $ 117,143 $ - 
Warrenton Diking District 3, Clatsop County, 
Oreg.1 1940 74,596 
Webb District Improvement Co., Columbia 
County, Oreg.1 1940 84,592 - 
Westland District Improvement Co., Columbia 
County, Oreg.1 1940 205,531 
Westport District Columbia and Clatsop 
Counties, Oreg. 1943 40,658 
Woodson Drainage District, Columbia County, 
Oreg.1 1940 22,797 
Youngs River Dikes, Clatsop County, Oreg.1 1942 248,802 
Total Columbia River Basin - 7,163,061 30,000 
LEWIS RIVER BASIN 
Diking and Improvement District 11, Cowlitz 
County, Wash.1 1943 172,521 
COWLITZ RIVER BASIN 
Cowlitz County Drainage Improvement District 1, 
Wash.' 1939 42,978 
Diking Improvement District 2, Cowlitz 
County, Wash.' 1940 121,165 
Diking Improvement District 13, Cowlitz County, 
Wash.1 1939 28,592 
Total Cowlitz River Basin - 192,735 - 
LOWER COLUMBIA RIVER BASIN 
Bachelor Island, Wash.2 
Beaver Drainage District, Oreg. 1966 102,521 
Clatskanie Drainage District, Oreg.2 1964 18,543 
Clatskanie River area, Columbia County, Oreg.2 1960 268 - 
Clatsop County Drainage District 1, Oreg.2 1960 4,472 - 
Clatsop County Diking District 4, Oreg. 2 
Clatsop County Diking District 6, Oreg.2 1961 8,824 - 
Columbia Drainage District 1, Oreg. - 
Cowlitz County Consolidated Diking Improvement 
District 1, Wash.2 - 
Cowlitz County Diking Improvement District 2, 
Wash.1 1967 363,000 
Cowlitz County Diking Improvement District 13, 
Wash.1 
1967 65,345 
Cowlitz County Diking Improvement District 15, 
Wash.' 1967 304,794 
Deer Island Drainage District, Oreg.2 - - 
Hayden Island, Oreg.2 1950 - - 
John Drainage District, Oreg.5 1961 23,754 - 
Kalama River (South Area) Levee, Cowlitz 
County, Wash.2 1969 55,594 
Lake River Delta area, Wash.5 
1140

PORTLAND, OREG., DISTRICT 
TABLE 37-L (Cont'd) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Lewis River area, Wash.2 -$ - $ - 
Magruder Drainage District, Oreg.2 
Multnomah County Drainage District 1, Oreg.' 
Peninsula Drainage District 1, Oreg.1 
Peninsula Drainage District 2, Oreg.2 
Rainier Drainage District, Oreg.' 
Sandy Drainage District, Oreg. 
Sauvie Island Drainage District, Oreg.1 
Vancouver Lake Area, Wash. 
Woodson Drainage District, Oreg.1 
Total Lower Columbia River Basin 
WILLAMETTE RIVER BASIN 
Amazon Creek, Oreg.1 
Area east of Albany, Oreg.5 
Ash Creek, Willamette River, Oreg.2 
Ash Swale, Salt Creek, Oreg. 2 
Bear Creek, Long Tom River, Oreg.2 
Beaver Creek, Crabtree Creek, Oreg. 2 
Calapooia River, Oreg.2 
Coyote and Spencer Creeks, Long Tom River, 
Oreg.2 
East Muddy and Lake Creek, Oreg. 2 
Ferguson Creek, Long Tom River, Oreg.2 
Flat Creek, Long Tom River, Oreg.2 
Floodwall and Levees at Portland, Oreg. 2 
Holley Lake, Oreg.5 
Johnson Creek, Oreg.2 
Mud and Baskett Slough, Rickreall Creek, 
Oreg.5 
Pudding River, Oreg.2 
Salt Creek, Yamhill River, Oreg.2 
Shelton Ditch, Willamette River, Oreg. 2 
Soap Creek, Willamette River, Oreg.5 
Turner Prairie, Mill Creek, Oreg. s 
West Muddy Creek and Marys River, Oreg.2 
Wiley Creek Lake, Oreg.8 
Willamette Falls fish ladder, Oreg.2 
Willamette River Basin Channel clearing and 
snagging. 2 
Total Willamette River Basin 
Beaver Creek near Tillamook, Oreg.1 0 
Castle Rock, Cowlitz River, Wash.1 
Catching Inlet Drainage District, Coos River, 
Oreg.1,10 
Clackamas River at Dixon Farm location, Oreg.(, 10 
Coquille River, Oreg.2 
1960 
1964 
1961 
1961 
1967 
1954 
1966 
1950 
1964 
1960 
- 
1966 
1959 
1960 
1959 
1963 
1966 
1950 
1967 
1962 
1967 
1957 
1959 
1952 
1948 
774 
1,491,357 
43,292 
35,265 
593,945 
15,0566 
665,671 
162,500 
4,171,616 
1,214,3007 
4,559 
11,595 
6,819 
465 
241,992 
76,437 
5,000 
39,624 
4,056 
112,0009 
1,722,887 
106,198 
104,921 
182,655 
61,34411 
908 
1141

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 37-L (Cont'd) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Fun Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Local flood protection projects, Columbia River 
Basin, Oreg. and Wash.1 1962 $ 204,06512 $ - 
McKenzie River near Walterville, Oreg.1,10 1967 148,358 - 
Mill Four Drainage District, Yaquina River, 
Oreg.1 1948 118,433 
Molalla River at Milk Creek location, Oreg. 1 ,1 0 1955 55,007 
Molalla River at Ressel location, Oreg.1, 10 1952 55,189 
Salmon Creek at Oakridge, Oreg. 1 , 10 1960 288,447 
Stillwell Drainage District, Tillamook Bay, 
Oreg. 1,10 1961 176,351 
Umpqua River and tributaries, Oreg.' 1952 428,881 
Vicinity of Nehalem, Nehalem River, Oreg.1 1952 45,677 
1. Completed. 8. Recommendation for early authorization rescinded by S. 
2. Classified inactive. Doc. 104, 86th Cong., 2d sess. in Flood Control Act 1960. 
3. Includes $26,241, Emergency Relief Act funds. 9. Pro rata share of site selection studies. 
4. In addition $25,000 contributed funds expended for new 10. Authorized by Chief of Engineers. 
work. 11. In addition $2,520 contributed funds expended for new 
5. Deferred for restudy. work. 
6. Cost is for engineering only. Project was constructed by 12. Includes three projects: Cowlitz River at Randle, Wash., 
local interests. cost for new work, $11,095; Lower Cowlitz River, Wash., 
7. In addition $154,751 contributed funds expended for $181,652; and Prineville, Oreg., $11,318. 
new work, $88,784 "Required" and $65,967 "Other". 
TABLE 37-M FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
(See Section 50 of Text) 
Fiscal Year 
Costs 
Preauthorization studies: 
Clackamas River, Dixon Farm, Oreg. $ 445 
Elk Creek, Cannon Beach, Oreg. 2,498 
Park Place Area, Oreg. 76 
Rockaway, Oreg. 473 
Total $ 3,492 
Emergency flood control activities: 
Advance preparation 22,346 
Flood emergency operations 
Repair and restoration, Clatsop County D. D. No. 1 12,825 
Total $35,171 
1142

PORTLAND, OREG., DISTRICT 
PRINCIPAL DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM AND POWERPLANT 
Project 
NAVIGATION LOCK 
Bonneville Lock and Dam, 
Oreg. and Wash. (Lake Bonneville) 
(See Section 51 of Text). 
Dimensions: 
Clear Width of Chamber 
Greatest Length Available for Full Width 
Lift (Vertical): 
At Extreme Low Water and Normal Pool Level 
At Normal River Stage 
At Extreme High Water 
Depth Over Miter Sills at Adopted Low Water 
Character of Foundation 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Capacity 
Elevation of Gate Sills on Crest of Spillway 
Height Above Lowest Foundation 
Length of Dam Proper 
Length of Dam Overall 
Width at Base 
Gate Openings 
Crest Overflow (Above Mean Sea Level) 
Pool Elevation (Normal) (Above Mean Sea Level) 
POWERPLANT 
Length 
Width 
Height (Roof to Bedrock) 
Generator (Station Unit) 
Generators 
Total Rated Capacity 
Speed 
76 Feet. 
500 Feet 
66 Feet 
59 Feet 
About 30 Feet 
24.2 Feet 
Andesite 
January 1938 
Concrete Gravity 
1938 
1,600,000 Cubic Feet 
Per Second 
23.3 Feet 
About 170 Feet 
1,090 Feet 
1,230 Feet 
200 Feet 
18 
24 Feet 
72 Feet 
1,027 Feet 
190 Feet 
190 Feet 
1-4,000 kw 0.8 Power 
Factor 
2-43,200 kw 0.9 
Power Factor 
8-54,000 kw 0.9 
Power Factor 
518,400 kw 0.9 
Power Factor 
75 Revolutions Per Minute 
NAVIGATION LOCK 
The Dalles Lock and Dam 
Wash. and Oreg. (Lake Celilo) 
(See Section 58 of Text) 
Type 
Lift Normal 
Net Clear Length 
Net Clear Width 
Normal Depth Over Upper Sill 
Minimum Depth Over Lower Sill 
Opened to Navigation
1143 
TABLE 37-N 
Single Lift 
87.5 Feet 
675 Feet 
86 Feet 
20 Feet 
15 Feet 
Mar. 17, 1957

TABLE 37-N (Cont'd) 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
PRINCIPAL DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM AND POWERPLANT 
Project 
SPILLWAY DAM 
Type 
Elevation of Crest 
Top of Crest Gates 
Number of Gates 
Size of Gates 
Height (Foundation to Crest) 
Design Flood 
Powerhouse Dimensions 
Generators Main Units 
Generators Main Units 
Total Rated Capacity 
Fishwater Supply Units 
Station Service Units 
Controlled 
121 Ft. msl 
162 Ft. msl 
23 
50 by 43 Feet 
120 Feet 
2,290,000 cfs 
POWERPLANT 
240 by 2150 Feet 
14 @ 78,000 kw Each 
Additional 8 @ 
85,975 kw Each 
Ultimate 22-1,806,808 kw 
2 @ 13,500 kw Each 
2 @ 3,000 kw Each 
TABLE 37-0 OTHER AUTHORIZED MULTIPLE-PURPOSE PROJECTS INCLUDING POWER 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Restoration of Indian Fishing Grounds, 
Bonneville, Oreg. 1969 $ 185,000 $ - 
Strube Lake and Cougar Additional Power, 
Oreg. 1964 
Waldo Lake Tunnel, Oreg.' 
1. Authorization Rescinded August 28, 1958 (Public Law 
85-820). 
1144

PORTLAND, OREG., DISTRICT 
TABLE 37-P COMPLETED FLOOD PLAIN INFORMATION STUDIES 
(See Section 61 of Text) 
Date Federal 
Location Requesting Agency Completed Cost 
Willamette R. Basin Oregon State Water June 19701 $ 31,585 
Canby-Barlow-Wilsonville Resources Board 
Area, Oregon 
Willamette R. Basin Oregon State Water June 1970 28,271 
Gladstone-Oregon City- Resources Board 
West Linn-Jennings Lodge 
Area, Oregon 
Willamette R. Basin Oregon State Water May 1970 24,550 
Milwaukie-Oak Grove- Resources Board 
Lake Oswego Area, Oregon 
Willamette R. Basin Oregon State Water June 1969 48,997 
Washington County, Oregon Resources Board 
Cowlitz R. Basin Washington Dept. of Jan 1969 49,498 
Cowlitz County, Wash. Water Resources 
Willamette R. Basin Oregon State Water May 1968 99,265 
Marion & Polk Counties, Oregon Resources Board 
Willamette River Basin Oregon State Water Jan 1967 139,601 
Lane County, Oregon Resources Board 
Willamette River Basin Oregon State Water Mar 1966 3,963 
Interim Report Resources Board 
Umpqua River Basin Oregon State Water June 1966 3,424 
Interim Report Resources Board 
Rogue River Basin Oregon State Water Dec 1965 5,495 
Interim Report Resources Board 
1145

SEATTLE, WASH., DISTRICT * 
This district comprises Washington except southern 
and southeastern portions, northern Idaho, and northwestern 
Montana embraced in drainage basins tributary 
to Pacific Ocean south of international boundary 
to Cape Disappointment, and to Columbia River 
above Yakima River, inclusive. 
IMPROVEMENTS 
Navigation Page 
1. Anacortes Harbor, Wash. ..................... 1147 
2. Bellingham Harbor, Wash. .................... 1148 
3. Everett Harbor and Snohomish River, 
W ash. ..................................... 1149 
4. Grays Harbor and Chehalis River, 
W ash. ........... ........ .... ........... 1149 
5. Lake Washington Ship Canal, Wash. .. 1150 
6. Mats Mats Bay, Wash. ........................ 1151 
7. Puget Sound and its Tributary Waters, 
W ash ......... ........... ................ 1151 
8. Quillayute River, Wash. ....................... 1151 
9. Sammamish River, Wash. .................... 1152 
10. Swinomish Channel, Wash. ................. 1152 
11. Willapa River and Harbor and Naselle 
River, W ash ..................................... 1152 
12. Reconnaissance and Condition Surveys 1153 
13. Other Authorized Navigation Projects .. 1153 
14. Navigation Work under Special 
Authorization..................... 1153 
Beach Erosion Control 
15. Beach Erosion Control Work under 
Special Authorization ........................ 1153 
Flood Control 
16. Columbia River Basin, Local 
Protection Projects, Idaho, Mont., 
and W ash. ..................................... 1153 
Flood Control (cont.) Page 
17. Howard A. Hanson Dam, Wash ........ 1154 
18. Mud Mountain Dam, Wash. ................. 1154 
19. Startup, Wallace River, Wash. .............. 1154 
20. Stillaguamish River, Wash. .................. 1155 
21. Tacoma, Puyallup River, Wash. ........... 1155 
22. Wynoochee Lake, Wash. ...................... 1155 
23. Yakima River at Ellensburg, Wash...... 1156 
24. Inspection of Completed Flood Control 
Projects ...................... ........................ 1156 
25. Scheduling Flood Control Reservoir 
Operations ....... ....................... 1156 
26. Other Authorized Flood Control 
Projects ..................................... 1157 
27. Flood Control Work under Special 
Authorization .................................. 1157 
Multiple-Purpose Projects Including Power 
28. Albeni Falls Dam, Idaho ..................... 1157 
29. Chief Joseph Dam (Rufus Woods 
Lake), W ash ......................................... 1157 
30. Libby Dam and Lake, Mont ................. 1158 
31. Other Authorized Multiple-Purpose 
Projects Including Power .................. 1159 
General Investigations 
32. 
33. 
34. 
Surveys ........................ .......................... 1159 
Collection and Study of Basic Data ..... 1159 
Research and Development ................. 1159 
NAVIGATION 
1. ANACORTES HARBOR, WASH. 
Location. On northern point of Fidalgo Island in 
Puget Sound, 17 miles south of Bellingham, Wash., and 
64 miles north of Seattle. The main harbor is on 
Guemes Channel. (See Coast and Geodetic Survey 
Chart 6377.) 
Existing project. Channel in Capsante Waterway, 12 
feet deep and 150 to 250 feet wide, between east side of 
Q Avenue and deep water in Fidalgo Bay, a distance of 
2,850 feet; and mooring basin 12 feet deep, 570 feet 
wide, and 960 feet long adjacent to north side of 
Capsante Waterway, protected by two pile break- 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
1147

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
waters, each 470 feet long, east and southeast of basin. 
Plane of reference is mean lower low water. Range 
between mean lower low water and mean higher high 
water is 8.2 feet. Extreme range is about 15.5 feet. (See 
table 38-B for authorizing legislation.) 
Local cooperation. Fully complied with. Expended $59, 
523 contributed funds. Other non-Federal costs are 
estimated at $98,000 (July 1958). 
Terminal facilities. There are 27 piers and wharves in 
the port of Anacortes; 18 on Guemes Channel, 3 on 
Capsante Waterway, and 6 on Fidalgo Bay. Three 
wharves on Guemes Channel are open for public use; 
of these, two are publicly owned and operated and used 
for handling general cargo in foreign and domestic 
trade. In addition, two wharves are used for ferries 
plying to the San Juan Islands and to Vancouver 
Island, British Columbia. One of these is privately 
owned and operated, and the other publicly owned and 
operated. Two of the wharves on Capsante Waterway 
and basin are publicly owned and operated and used 
for receiving petroleum products, and as a moorage for 
fishing and pleasure craft. All other wharves are used 
for general industrial purposes. In addition, there are 
two oil-refinery wharves located to the south of 
Capsante Waterway that are privately owned and 
operated and used for handling petroleum products in 
foreign and domestic trade. These facilities are 
considered adequate for existing commerce. (See Port 
Series No. 37-Port of Everett, Bellingham, Port 
Angeles, and Anacortes, Wash., revised 1963.) 
Operations and results during fiscal year. Maintenance 
dredging was scheduled and funded in FY 1970. The 
work was deferred because conservation agencies 
disapproved disposal of the material in deep water. 
Project was rescheduled for FY 1972. Condition survey 
was made in June. 
Condition at end of fiscal year. Project was completed in 
July 1957, excluding the "inactive" portion and inner 
portion of boat basin. Capsante Waterway was 
completed in 1930, except that portion west of R 
Avenue, which was omitted at the request of local 
interests. Construction of 2 pile breakwaters was 
completed in February 1957. Length of southeast 
breakwater was increased to 440 feet in 1958 by local 
interests to afford additional protection in the mooring 
basin from southeasterly winds. Extensions completed 
in December 1964 increased lengths of both breakwaters 
to 470 feet. Dredging of the mooring basin was 
completed in July 1957, except the inner portion, 
which was omitted at the request of local interests. 
2. BELLINGHAM HARBOR, WASH. 
Location. Part of Bellingham Bay, an arm of Puget 
Sound, at Bellingham, in northwestern Washington. 
(See Coast and Geodetic Survey Chart 6378.) 
Previous projects. For details see page 2006 of Annual 
Report for 1915 and page 1888 of Annual Report for 
1938. 
Existing project. Channel 30 feet deep in Whatcom 
Creek Waterway from deep water to head of harbor, 
363.2 feet wide to 750 feet from inner end, thence 18 
feet deep for inner 750 feet; Squalicum Creek 
Waterway, including dredging an entrance channel 
200 feet wide and 26 feet deep from deep water in the 
bay to main pierhead line, and maintenance of 
southerly half and westerly end of Squalicum Creek 
basin to 26 feet deep, provided that no dredging can be 
done within 75 feet of wharves, piers, or similar 
structures; and small-boat basin adjacent to Squalicum 
Creek Waterway by construction and maintenance of 
two sections of rubblemound breakwater with combined 
length of 3,900 feet including removal of existing 
rubblemound breakwater heretofore maintained under 
existing project, and using rock therefrom in construction 
of new breakwater, and including maintenance 
of minimum depths of 12 feet in entrance to 
basin. Plane of reference is mean lower low water. 
Range between mean lower low water and mean 
higher high water is 8.6 feet. Extreme range is about 16 
feet. (See table 38-B for authorizing legislation.) 
Local cooperation. Fully complied with. Funds contributed 
by Port of Bellingham have been expended, 
$31,581 (including cash contribution of $29,421 and 
credit of $2,160 for services performed by the Port.) In 
complying with terms of local cooperation, the Port 
expended $2,157,473 for bulkheads, groins, dredging, 
mooring and terminal facilities and utilities, and land 
development. 
Terminal facilities. Forty wharves and piers in Bellingham 
Harbor; 10 are on Whatcom Creek Waterway, 
7 on Squalicum Creek Waterway, 4 on I&J Street 
Waterway, and 19 on Bellingham Bay. Three wharves 
on Whatcom Creek Waterway serve general cargo 
terminals. Two of these, one which is publicly owned 
and operated and one privately owned and operated, 
are suitable for use by oceangoing vessels; the other one 
is privately owned and operated. (See Port Series No. 
37-Ports of Everett, Bellingham, Port Angeles, and 
Anacortes, Wash., revised 1963.) 
Operations and results during fiscal year. Maintenance, 
hired labor: Condition surveys of Squalicum Creek 
Waterway and small-boat basin adjacent to Squalicum 
Creek Waterway, and Whatcom Creek Waterway, 
were made in May 1970. 
Maintenance, contract: A contract for maintenance 
dredging in Whatcom Creek Waterway was completed 
in July 1969; 130,042 cubic yards were removed. 
Condition at end of fiscal year. Project completed 
February 1, 1961. (For further details, see Annual 
Report for 1961.) Only the outer portions of the 
channel were dredged in FY 1970. The inner portion of 
the channel was found by the Federal Water Quality 
Administration to be heavily polluted. The implementation 
of Washington State Water Quality 
Standards requires Georgia-Pacific C orporation to 
remove the polluted material from the waterway, 
1148

SEATTLE, WASH., DISTRICT 
deposit it on land, and allow adequate retention time 
for the effluent. Maintenance dredging in the inner 
portion of the channel will not be scheduled until 
Georgia-Pacific has completed this requirement. Costs 
for existing project to June 30, 1970, have been $1,510, 
258 Federal funds and $31,581 contributed funds for 
new work; and $351,632 Federal funds and $9,103 
contributed funds for maintenance, a total of $1,902, 
574. 
3. EVERETT HARBOR AND SNOHOMISH 
RIVER, WASH. 
Location. On Port Gardner Bay, at northern end of 
Possession Sound, an arm of Puget Sound at Everett, in 
northwestern Washington; and Snohomish River for 
6.3 miles above mouth. (See Coast and Geodetic 
Survey Chart 6448.) 
Previous projects. For details see page 704 of Annual 
Report for 1905, page 2005 of Annual Report for 1915, 
and page 1883 of Annual Report for 1938. 
Existing project. Training dike extending from a point 
opposite 23d Street northward 12,550 feet to outlet of 
Snohomish River, with spur dike extending 400 feet to 
pier-head line from north end of main dike; spur dike 
extending 1,410 feet westward from Preston Point; 
removal of a section of training dike north of 
Snohomish River outlet; channel 150 to 425 feet wide 
and 15 feet deep from deep water in Port Gardner Bay 
to 14th Street dock; thence a settling basin 700 feet 
wide, 1,200 feet long, and 20 feet deep, thence a 
channel 150 feet wide and 8 feet deep up river to head 
of Steamboat Slough, a total distance of about 6.3 
miles; settling basin within upper channel reach about 
1 mile long with a capacity of 1 million cubic yards; 
maintaining East Waterway to 30 feet deep; and 
raising the southerly 4,100 feet of existing training dike, 
extending the training dike 1,500 feet farther south, 
and constructing a breakwater along the south and 
west sides of the existing small boat basin. Plane of 
reference is mean lower low water. Range between 
mean lower low water and mean higher high water is 
11.1 feet. Extreme tidal range is about 19 feet. 
Estimated cost of new work under the 1968 River and 
Harbor Act is $1,777,000 (July 1969), including $1, 
360,000 Corps of Engineers funds, $12,000 Coast 
Guard funds, $404,000 local cash contribution, and 
other non-Federal costs estimated at $1,000. (See table 
38-B for authorizing legislation.) 
Local cooperation. Fully complied with, except for 1968 
Modification, which requires that local interests 
provide lands, easements, and rights-of-way, and cash 
contribution (9.6 percent of cost of training dike 
modification and extension; and 44.5 percent of cost of 
the boat basin breakwater). Local interests are also 
required to provide and maintain an adequate public 
landing or wharf, with provisions for sale of motor fuel, 
lubricants, and potable water, access roads, parking 
areas, and other necessary public-use shore facilities; 
451-584 0-72-73 
and make utility and other relocations or alterations as 
required for project purposes. 
Terminal facilities. There are 39 wharves and piers on 
Everett Harbor and Snohomish River, including 9 on 
Port Gardner Bay, 16 on East Waterway, and the 
remainder on Snohomish River. Of these, seven, one of 
which is publicly owned and operated, are used by 
oceangoing vessels. Remaining wharves serve various 
industrial purposes. In addition, there is a publicly 
owned and operated protected basin for fishing and 
pleasure craft. These facilities are considered adequate 
for existing commerce. (See Port Series No. 37-Ports 
of Everett, Bellingham, Port Angeles, and Anacortes, 
Wash., revised 1963.) 
Operations and results during fiscalyear. New work, hired 
labor: Planning started on training dike modification 
and extension authorized by the 1968 River and 
Harbor Act. Design Memorandum was about 75 
percent complete on June 30. 
Maintenance, hired labor: Condition survey of 
Snohomish River was made in September 1969. 
Maintenance, contract: Contract for channel dredging 
in Snohomish River upstream of the Burlington 
Northern railway bridge was awarded April 6, 1970, 
for removal of an estimated 558,000 cubic yards of 
material, and was 41 percent complete on June 30. 
Condition at end of fiscal year. Existing project was 
completed April 1963 except for the 1968 Modification, 
which provides for training dike modification 
and breakwater. Main dike was in fair condition. Costs 
for existing project to June 30, 1970, have been $2,712, 
760, of which $1,374,455 was for new work ($1,325,837 
Corps of Engineers funds, $43,000 Coast Guard funds, 
and $5,618 contributed funds), and $1,338,305 for 
maintenance. 
4. GRAYS HARBOR AND CHEHALIS 
RIVER, WASH. 
Location. Harbor lies at mouth of Chehalis River, in 
southwestern part of Washington, 45 miles north of 
entrance to Columbia River. Inner portion comprises 
two main channels, the south and the north, connecting 
harbor proper with Chehalis River at Aberdeen. 
Chehalis River rises in southwestern part of 
Washington about 40 miles east of Pacific Ocean, flows 
generally northwesterly and empties into eastern part 
of Grays Harbor. (See Coast and Geodetic Survey 
Chart 6195.) 
Previous projects. For details see pages 2002-03 of 
Annual Report for 1915, and page 1863 of Annual 
Report for 1938. 
Existing project. Provides for an entrance channel 
across the bar 600 feet wide and 30 feet deep, to be 
secured by a south jetty 13,734 feet long and a north 
jetty 16,000 feet long, both at an elevation of 16 feet, 
and by dredging; maintenance of channel 30 feet deep 
and 350 feet wide from deep water in Grays Harbor 14 
miles to Cow Point; thence 30 feet deep and 200 feet 
149

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
wide, suitably widened at bends, to a point 13,700 feet 
upstream from Union Pacific Railroad bridge at 
Aberdeen, a distance of 4 1/8 miles; a turning basin 30 
feet deep, 550 feet wide, and 1,000 feet long at 
upstream end of 30-foot channel near Cosmopolis; a 
channel 14 feet deep and 10 feet wide in South Bay to 
Bay City; two breakwaters at, and maintenance of 
entrance channel to, Westhaven Cove; and protection 
of Point Chehalis for an exposed length of about 7,500 
feet. Plane of reference is mean lower low water. Tidal 
range between mean lower low water and mean higher 
high water is 9 feet at Point Chehalis, 9.9 feet at 
Aberdeen, and 8.1 feet at Montesano. Extreme range is 
15 feet at Point Chehalis, 18.1 feet at Aberdeen, and 
23.8 feet at Montesano (river flood of 1935). (See table 
38-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 40 wharves and piers on 
Grays Harbor and adjacent inland waters; 15 are 
located at Hoquiam, 16 at Aberdeen, I each at 
Junction City and Cosmopolis, 2 at Markham, and 5 at 
Westhaven Cove. Fifteen of the facilities handle forest 
products; 9, receipt of seafood; 2, sand, gravel, and 
crushed rock; 2, petroleum products and bunkering of 
vessels; and 1 publicly owned facility handles general 
cargo in domestic and foreign trade; the remaining 11 
are used for mooring and making marine repairs. 
These facilities are considered adequate for existing 
commerce. (See Port Series No. 35-The Ports of 
Tacoma, Grays Harbor, and Olympia, Wash., revised 
1963.) 
Operations and results during fiscal year. Maintenance, 
hired labor: Channel condition surveys were made. 
The U.S. hopper dredge Pacific, during the period 
November 24, 1969, to January 14, 1970, removed 160, 
950 cubic yards, bin measurement, from Sand Island 
and Crossover channels. The U.S. hopper dredge Biddle 
removed 1,197,436 cubic yards, bin measurement, from 
Sand Island and Crossover channels during the period 
November 6, 1969, to February 2, 1970. Repairs were 
completed in April 1970 on portions of Point Chehalis 
revetment damaged by extreme high tides and strong 
winds during December 1969 and January 1970. 
Maintenance, contract: Pipeline dredge Robert Gray, 
leased from the Port of Grays Harbor Commission, 
removed 470,000 cubic yards of material from Chehalis 
River and North channel, during July and November 
1969, and April and May 1970. A contract was 
awarded in June 1970 for repairs to West Shore 
revetment. All dredges removed 1,828,386 cubic yards 
of material from the ship channel. 
Condition at end of fiscal year. Existing project was 
completed in November 1959, except for engineering 
studies and observations of Point Chehalis protective 
works, and excluding deferred and inactive portions. 
For further details, see Annual Report for 1967. (See 
table 38-C on total costs of existing project t oJune 30, 
1970.) 
5. LAKE WASHINGTON SHIP CANAL, 
WASHINGTON 
Location. Entirely within city of Seattle and extends 
from Puget Sound through Shilshole Bay, Salmon Bay, 
Lake Union, Portage Bay, and Union Bay to deep 
water in Lake Washington. (See Coast and Geodetic 
Survey Chart 6447.) 
Previous projects. For details see page 2003, Annual 
Report for 1915, and page 1880, Annual Report for 
1938. 
Existing project. Provides for a double lock and fixed 
dam with gated spillway and necessary accessory works 
at the Narrows at entrance to Salmon Bay, about 1.25 
miles from deep water in Puget Sound; for a channel 34 
feet deep and 300 feet wide from Puget Sound to 
Burlington Northern railway bridge, about 5,500 feet, 
with a passing basin 34 feet deep and log basin 8 feet 
deep at turn below railway bridge; then 34 feet deep 
and 150 to 200 feet wide to locks, about 900 feet; and a 
guide pier 600 feet long; for revetment of canal banks 
between locks and Lake Union and between Lakes 
Union and Washington; and for a channel 30 feet deep 
with a width of 100 feet from locks to Lake Union, 200 
feet thence to Portage Cut, 100 feet through Portage 
Cut, and thence 200 feet wide through Union Bay to 
Lake Washington. Section included in project is about 
10 miles long. Plane of reference is mean lower low 
water. Extreme tidal range is 19.3 feet. Range between 
mean lower low water and mean higher high water is 
11.3 feet, and between mean lower low water and 
extreme low water is 4.6 feet. Ordinary fluctuation in 
upper pool is about 22 inches; extreme fluctuation has 
been 3.6 feet. Principal features of double lock and dam 
(structures are at Seattle, Wash.) are set forth in table 
38-D. (See also table 38-B on authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 103 wharves and piers on 
Lake Washington ship canal and adjacent inland 
waters, including Salmon Bay, Lake Union, Portage 
Bay, and Lake Washington. Of these, 17 are publicly 
owned, 8 of which are privately operated. The other 
wharves include 32 used for building, outfitting, or 
repair of vessels, 10 for handling petroleum products, 
20 for various industrial purposes, and 24 for mooring 
and servicing pleasure craft. Facilities are considered 
adequate for existing commerce. (See Port Series No. 
36--The Port of Seattle, Washington-Revised 1963.) 
Operations and results during fiscal year. Maintenance, 
hired labor: Locks were operated and maintained all 
year. 
Condition at end of fiscal year. Project was completed in 
1934. (For further details see Annual Report for 1935.) 
Costs for existing project toJune 30, 1970, were $3,539, 
295 for new work, including $192,516 public works 
funds, and $14,158,837 for operation and maintenance, 
a total of $17,698,132. 
1150

SEATTLE, WASH., DISTRICT 
6. MATS MATS BAY, WASH. 
Location. On Admiralty Inlet, a part of Puget Sound 
between Whidbey Island and Olympic Peninsula, near 
the entrance to Hood Canal, about 12 miles southeast 
of Port Townsend in northwestern Washington. (See 
U.S. Coast and Geodetic Survey Chart 6450.) 
Existing project. Provides for construction of entrance 
channel 100 feet wide, 3,700 feet long, and 6 feet deep 
at mean lower low water, and for annual maintenance. 
Range between mean lower low water and mean 
higher high water is 9.9 feet. Extreme range is about 18 
feet. (See table 38-B for authorizing legislation.) 
Local cooperation. Fully complied with. The Port of 
Port Townsend, by resolution adopted March 11, 1969, 
agreed to provide lands, easements, rights-of-way, and 
spoil-disposal areas; hold the United States free from 
damages; provide berthing areas for commercial barge 
traffic; maintain suitable public landing with facilities 
for sale of motor fuel, lubricants, and potable water, 
moorage facilities for transient and local boats, open to 
all on equal terms, and public access roads and parking 
areas; make alterations to utility facilities as required; 
establish regulations for prevention of pollution in 
accordance with existing laws and regulations; and 
contribute in cash 20 percent of the first cost of channel 
improvement, prior to start of construction. The Port 
contributed $26,100 in June 1969 and $2,188 in March 
1970, a total of $28,288, all expended. 
Terminal facilities. There are no public piers or 
wharves other than a marina constructed by the Port of 
Port Townsend. The marina has adequate facilities for 
existing traffic. A quarry on east side of bay has a 
privately owned barge-loading facility. 
Operations and results during fiscal year. New work, 
contract: Contract work was completed in November. 
New work, hired labor: Condition survey was made 
in November. 
Condition at end of fiscal year. Project was completed in 
November 1969. 
7. PUGET SOUND AND ITS TRIBUTARY 
WATERS, WASHINGTON 
Location. Puget Sound is in western part of Washington. 
Cities of Seattle, Tacoma, Olympia, Everett, 
Bellingham, and many small towns are on its bays and 
inlets. (See Coast and Geodetic Survey Charts 6300, 
6450, and 6460.) 
Previous projects. For details see page 2003 of Annual 
Report for 1915 and page 1869 of Annual Report for 
1938. 
Existing project. Maintenance of Puget Sound and its 
tributary waters by snagging and dredging; and 
removal, in cooperation with city of Seattle, of floating 
debris from Seattle Harbor area. (See table 38-B for 
authorizing legislation.) 
Local cooperation. None required. City of Seattle is 
cooperating in a program for control of floating debris 
in Seattle Harbor. 
Terminal facilities. Terminal facilities at numerous 
localities on Puget Sound and its tributary waters are, 
in general, considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance, 
hired labor: U.S. snag boat W. T Preston was operated 
for about 9.5 months and removed 2,164 snags, 513 
piles, and miscellaneous debris. The mattress sill in 
Freshwater Slough, south fork of the Skagit River, was 
removed. Maintenance, contract: A total of 3,159 tons 
of harbor debris was disposed of at the Tulalip landfill 
site near Marysville, Washington. 
Condition at end of fiscal year. Work consists chiefly of 
snagging in principal tributaries of Puget Sound. No 
permanent results are obtainable, but maintenance of 
existing channels requires practically continuous operation 
of snag boat. Costs of existing project to June 
30, 1970, were $43,337 for new work and $4,856,657 for 
maintenance, a total of $4,899,994. 
8. QUILLAYUTE RIVER, WASH. 
Location. River is formed by junction of Soleduck and 
Bogachiel Rivers, in northwestern Washington, and 
flows westerly 5 miles to Pacific Ocean at La Push, 
about 30 miles south of Cape Flattery. (See Coast and 
Geodetic Survey Chart 6102.) 
Existing project. Provides for: (a) Jetty 15 feet high on 
easterly side of river mouth, and a dike on westerly side, 
with a view of stabilizing entrance; (b) channel 10 feet 
deep and 100 feet wide extending 2,000 feet upstream 
from deep water; and (c) basin 10 feet deep, 300 to 425 
feet wide, and 2,400 feet long upstream of channel. 
Section included in project is 4,400 feet long. Plane of 
reference is mean lower low water. Range between 
mean lower low water and mean higher high water at 
La Push is 8.3 feet. Extreme range is about 15 feet. (See 
table 38-B for authorizing legislation.) 
Local cooperation. Fully complied with. Expended $20, 
000 contributed funds. 
Terminal facilities. Seven terminals at La Push, near 
mouth of Quillayute River; of these, five privately 
owned, and one owned by Port of Port Angeles within 
project basin, are open to public use, the seventh, 
owned by the United States, is part of Coast Guard 
station. In addition, there is a protected basin, publicly 
owned and operated, for commercial fishing and 
pleasure craft. With the exception of the protected 
basin, these facilities are considered adequate for 
existing commerce. 
Operations and results during fiscal year. Maintenance, 
hired labor: Condition survey of Quillayute River 
channel and boat basin was made in February. 
Maintenance, contract: Channel dredging contract 
was awarded in June 1970 for removal of estimated 
75,000 cubic yards of material. 
1151

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end of fiscal year. Project was completed in 
February 1960. (For further details, see Annual Report 
for 1963.) An inspection made in June 1970 showed the 
jetty to be in good condition. The spit which protects 
the boat basin and navigation channel is degrading in 
cross-sections from erosion and loss of littoral drift. 
9. SAMMAMISH RIVER, WASH. 
Location. Originates at northern end of Lake Sammamish, 
11 miles east of Seattle, Wash., and flows 
northwesterly 15 miles to northern end of Lake 
Washington, which forms eastern boundary of Seattle. 
(See Coast and Geodetic Survey Charts 6449 and 6450, 
and Geological Survey Maps "Edmonds, Wash.," and 
"Edmonds, East, Wash.") 
Existing project. Provides for dredging navigation 
channel 4.5 feet deep (14.5 feet above mean lower low 
water in Puget Sound), 100 feet wide, and 2,800 feet 
long to provide full access to the Sammamish River 
from Lake Washington. Estimated cost of construction 
is $47,000 (Feb. 1967), including $22,500 Corps of 
Engineers funds, $2,000 Coast Guard funds, and $22, 
500 local cash contribution. (See table 38-B for 
authorizing legislation.) 
Local cooperation. Local interests must provide lands, 
easements, and rights-of-way as required, including 
suitable spoil-disposal areas with necessary retaining 
dikes, bulkheads, and embankments; hold the United 
States free from damages; make alterations and 
relocations as required for sewer, water supply, and 
other utility facilities; and contribute in cash 50 
percent of the cost of the navigation improvements 
prior to start of construction. By letter of March 1, 
1968, King County, sponsor of the project, agreed to 
the local cooperation requirements. The county was 
requested on March 24, 1970, to furnish required local 
cooperation. By letter of April 27, 1970, the county 
advised that it was unable to comply at that time, but 
expects to furnish the required lands and funds in 1971. 
Terminal facilities. There is a privately owned marina 
about 1 mile upstream from the river's mouth and two 
large marinas on Lake Washington adjacent to the 
mouth of Sammamish River. The Washington State 
Department of Game maintains a public boat-launching 
ramp downstream adjacent to the Kenmore bridge. 
Facilities are adequate for existing traffic. 
Operations and results during fiscal year. New Work, hired 
labor: Preconstruction planning was essentially completed. 
Award of contract is awaiting compliance by 
sponsor with local cooperation requirements. 
Condition at end of fiscalyear. No construction work has 
been done. 
10. SWINOMISH CHANNEL, WASH. 
Location. An inland passage, 11 miles long, between 
Saratoga Passage and Padilla Bay, in'northwestern 
part of Washington, about 60 miles north of Seattle. 
(See Coast and Geodetic Survey Charts 6300, 6376, 
and 6380.) 
Existing project. A channel 100 feet wide and 12 feet 
deep for 11 miles from deep water in Saratoga Passage 
to deep water in Padilla Bay, by dredging and dike 
construction where necessary; and removal of projecting 
rocky points of McGlinn and Fidalgo Islands 
obstructing navigation at "Hole-in-the-Wall." Plane of 
reference is mean lower low water. Range between 
mean lower low water and mean higher high water is 
11.5 feet at south end of channel, 8.4 feet at north end, 
arnd 10 feet at La Conner. Extreme tidal range is about 
19.5 feet at south end of channel and about 16 feet at 
north end. (See table 38-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 17 wharves, docks, and 
piers on Swinomish Channel, all but 3 of which are 
privately owned. Of these, 1 is used for handling 
general cargo, 5 are used exclusively for moorage, 
unloading, and servicing of fishing vessels; 1 is used for 
handling petroleum products; 2 facilities are used for 
log dumps; and 2 for handling non-metallic minerals. 
Three publicly owned facilities for launching, mooring, 
and servicing small craft are within the city limits of La 
Conner. Terminal facilities for general cargo are 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance, 
hired labor: Quarterly condition surveys were made on 
channel centerliile. Maintenance, contract: Contract 
awarded in fiscal year 1969 was completed in August 
1969, with removal of 82,743 cubic yards of material. 
Contract for channel dredging was awarded in April 
for removal of an estimated 125,000 cubic yards of 
material. Work was 48 percent completed. 
Condition at end of fiscal year. Project was completed in 
March 1965. (For further details, see Annual Report 
for 1965.) The south jetty west of Goat Island has 
deteriorated to the point where it is no longer effective 
in reducing shoaling from the Skagit River delta area. 
11. WILLAPA RIVER AND HARBOR AND 
NASELLE RIVER, WASH. 
Location. Willapa Harbor consists of lower reaches of 
Willapa River and Bay, an inlet of Pacific Ocean 
about 30 miles north of mouth of Columbia River in 
Washington. Willapa River rises about 30 miles east of 
harbor, flows generally westerly, and empties into the 
bay. Naselle River enters the bay near its southerly 
end. (See Coast and Geodetic Survey Chart 6185.) 
Previous projects. For details see Annual Reports for 
1915 (page 2001), 1910 (page 968), and 1938 (page 
1861). 
Existing project. Provides for: (a) Channel over bar at 
mouth of Willapa Bay, 26 feet deep and at least 500 
feet wide; (b) Channel 24 feet deep, and 200 feet wide 
from deep water in Willapa Bay to foot of Ferry Street 
at South Bend, thence 300 feet wide to westerly end of 
1152

SEATTLE, WASH., DISTRICT 
narrows, thence 250 feet wide to forks of river at 
Raymond, including a cutoff channel 3,100 feet long at 
narrows and a closing dike at Mailboat Slough; (c) 
channel 24 feet deep and 150 feet wide up south fork to 
deep basin above Cram lumber mill, and up north fork 
to 12th Street, with a turning basin 250 feet wide, 350 
feet long, and 24 feet deep at latter point; (d) channel 
10 feet deep and 40 feet wide from deep water in Palix 
River to Bay Center dock, with widening at shoreward 
end to provide a small mooring basin; (e) mooring 
basin 15 feet deep, 350 feet wide, and 600 feet long 
adjacent to port wharf at Tokeland; (f) entrance 
channel at Nahcotta 10 feet deep and 300 feet wide, 
and mooring basin 10 feet deep, 500 feet wide, and 1, 
100 feet long, protected by a rubblemound breakwater 
about 1,600 feet long; and (g) removal of snags, piles, 
and other obstructions in navigable channel of Naselle 
River between Naselle and mouth. Project includes 
about 26 miles of channel from entrance through 
Willapa River forks, 2,800 feet of Palix River-Bay 
Center channel, and 9 miles of Naselle River upstream 
of U.S. Highway 101 Bridge. Plane of reference is mean 
lower low water. Tidal range between mean lower low 
water and mean higher high water is 8.9 feet at Toke 
Point; 9.9 feet at Raymond; 9.2 feet at Bay Center; and 
10.8 feet near Naselle. Extreme range is 18 feet at Toke 
Point; 19.3 feet at Raymond; 16 feet at Bay Center; 
and 18 feet near Naselle. (See table 38-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 24 wharves on Willapa 
River and Harbor, including 5 in Willapa Bay, 4 in 
Bay Center, 12 in Raymond and South Bend, and 1 in 
Tokeland. Two of the wharves at Raymond and South 
Bend are suitable for use by oceangoing vessels; one of 
these is publicly owned and operated as a general cargo 
terminal, and one is located at a sawmill. The other 
wharves, including three that are publicly owned and 
operated, are used by shallow-draft vessels. These 
facilities are considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance, 
hired labor: U.S. hopper dredge Harding removed 700, 
133 cubic yards of material from the bar channel, and 
88,967 cubic yards of material from the inner channel, 
July 30 to September 16, 1969. U. S. hopper dredge 
Pacific removed 95,900 cubic yards from the inner 
channel, January 14 to February 20, 1970. Numerous 
condition surveys were conducted on the inner and bar 
channels. Maintenance, contract: A contract for 
dredging various reaches of Willapa River above 
Johnson Slough was completed, October 22, 1969, to 
January 4, 1970, with 648,641 cubic yards of material 
removed. A contract was awarded in June 1970 for 
maintenance dredging at Bay Center and Tokeland. 
Condition at end of fiscal year. Project was completed in 
November 1958. (For further details, see Annual 
Report for 1959.) (See table 38-C for total costs of 
existing project to June 30, 1970.) 
12. RECONNAISSANCE AND CONDITION 
SURVEYS 
See table 38-E. 
13. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 38-F. 
14. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to section 107, Public Law 86- 
645 (preauthorization) 
Fiscal year costs for preauthorization studies were 
$10,706 for Anacortes Harbor, Wash.; $14,966 for 
Blake Island, Wash.; $3,750 for Brownsville, Wash.; 
$2,500 for Coupeville, Wash.; $21,891 for Dungeness- 
Sequim, Wash.; $30,704 for Friday Harbor, Wash.; $5, 
295 for La Conner, Wash.; $43,200 for Oak Harbor, 
Wash.; $30,172 for Port Orchard, Wash.; and $7,498 
for Squalicum Small-Boat Harbor, Bellingham, Wash. 
BEACH EROSION CONTROL 
15. BEACH EROSION CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
Beach erosion control activities pursuant to section 103, Public 
Law 87-874 (preauthorization) 
Fiscal year costs for preauthorization studies were 
$2,500 for Ediz Hook, Wash. 
FLOOD CONTROL 
16. COLUMBIA RIVER BASIN, LOCAL 
PROTECTION PROJECTS, IDAHO, 
MONT., AND WASH. 
Location. Improvements included in this project are 
along Columbia River and its tributaries. Columbia 
River rises in Columbia Lake, British Columbia, at 
elevation 2650, flows northwesterly for nearly 200 
miles, then southerly through Upper and Lower Arrow 
Lakes to enter the United States near northeast corner 
of the State of Washington. From international 
boundary the river flows south 112 miles to a point 
below mouth of Spokane River, then west 100 miles to 
mouth of Okanogan River. Swinging south, the river 
follows eastern foothills of the Cascade Mountains for 
209 miles to its confluence with Snake River. A few 
miles below the Snake, it turns sharply westward and 
flows for 324 miles, forming Washington-Oregon 
boundary, to the Pacific Ocean. Projects in Seattle 
District are on Crab and Wilson Creeks, Entiat, 
Methow, Okanogan, Wenatchee, and Yakima Rivers 
in Washington; Clark Fork at Missoula and St. Regis 
River, Mont.; and Lightning Creek, Clark Fork, 
Idaho. 
1153

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Existing project. Flood Control Act of 1950 approved a 
general comprehensive plan for Columbia River Basin 
for flood control and other purposes as set forth in 
House Document 531, 81st Congress, 2d session, and 
authorized to be appropriated $75 million for partial 
accomplishment of projects. Of this authorization, an 
amount not to exceed $15 million was authorized for 
construction of local flood-protection works in Columbia 
River basin, individual projects to be selected 
by Chief of Engineers with approval of the Secretary of 
the Army, subject to condition that all work undertaken 
pursuant to this authoritt shall be economically 
justified before construction. (See table 38- 
B for authorizing legislation. See a lso table 38-G on 
projects eligible for selection.) 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, as amended, applies. Non-Federal costs are 
evaluated in justification reports prepared for each 
proposed location. 
Operations and results during fiscalyear. Work on project, 
Yakima River at Ellensburg, Washington, is reported 
separately. 
Condition at end of fiscal year. Project for Lightning 
Creek, Clark Fork, Idaho, was completed in March 
1959. Project for Clark Fork at Missoula was completed 
in June 1966. Project for Crab and Wilson 
Creeks, Wash., expired in July 1964 due to lack of local 
cooperation. 
17. HOWARD A. HANSON DAM, WASH. 
Location. Green River, in northwestern Washington, 
flows westerly for 40 miles to Auburn, thence northerly 
32 miles to its mouth in Elliott Bay at Seattle. Dam is at 
river mile 64, 6 miles southeast of Kanaskat, and 1 mile 
downstream from mouth of North Fork. (See Geological 
Survey topographic sheet, "Cedar Lake 
quadrangle, Wash.") 
Existing project. Rockfill dam about 235 feet high, 
with gated spillway having a concrete weir at elevation 
1,176 feet above mean sea level and top of gates at 
elevation 1206, creating a reservoir with capacity of 
106,000 acre-feet. Dam along crest is about 675 feet 
long. Improvement is designed to control flooding in 
Green River Valley to alleviate agricultural and urban 
flood damage, and make possible further expansion of 
Seattle industrial area. (See table 38-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. Contributed 
funds expended, $2 million. 
Operations and results during fiscal year. Maintenance, 
hired labor: Operation continued all year. Routine 
maintenance was accomplished on roads, gages, debris 
booms, turbidimeter, ditches, powerline, and other 
project features. Work continued on land acquisition, 
water quality surveys, water storage studies, and 
channel capacity study. 
Maintenance, contract: Contract for seepage control 
tunnel was completed in November 1969. Settlement of 
the fill for the relocated Burlington Northern railway 
between stations 10989 and 10991 was under surveillance 
to determine need for additional work. The 
deferred construction period has been extended to 
cover this area, in lieu of accomplishing immediate and 
more costly remedial work. 
Condition at end of fiscal year. Project was completed in 
June 1963. (For further details, see Annual Report for 
1966.) 
18. MUD MOUNTAIN DAM, WASH. 
Location. On White River, principal tributary of 
Puyallup River, near Mud Mountain, 28 miles above 
its confluence with Puyallup River, and 38 miles above 
mouth of Puyallup River. Dam is 6 miles southeast of 
Enumclaw, in northwestern Washington, and 38 miles 
east of Tacoma. (See Geological Survey topographic 
sheet "Cedar Lake quadrangle, Washington.") 
Existing project. Rockfill dam, 700 feet long at crest 
elevation, rises 425 feet above bedrock. Reservoir has 
storage capacity of about 106,000 acre-feet. Outlet 
works are in right abutment and permit controlled 
discharge of 17,700 cubic feet per second through two 
concrete-lined tunnels with uncontrolled discharge 
over spillway having maximum capacity of 139,000 
cubic feet per second. Improvement affords flood 
protection to White and Puyallup River Valleys and 
protects Tacoma industrial district in conjunction with 
Puyallup River project at Tacoma against floods about 
50 percent greater than maximum discharge of record. 
Estimated cost of recreation facilities for completed 
project is $67,000 (July 1969). (See table 38-B for 
authorizing legislation.) 
Local cooperation. None required. In 1958, $3,928 
funds contributed by King County were expended for 
changes on access road bridge. 
Operations and results duringfiscaly ear. New work, hired 
labor: Studies were underway on recreation facilities. 
Maintenance, hired labor: Engineering studies were 
made on 9-foot tunnel intake structure. Project features 
were operated all year. Maintenance was accomplished 
on dam facilities, 9-foot regulating outlet 
tunnel, intake structure, 23-foot tunnel walkways, 
gages, debris booms, powerlines, roads, ditches, and fish 
facilities. Interior painting of steel penstocks was 
started. Tank trucks hauled 2,565 fish past the dam. 
Installation of chain link security fencing was completed, 
and remodeling of vista house and restrooms 
was started. Mobilization for completion of 9-foot 
tunnel intake structure repairs was underway inJune. 
Condition at end of fiscal year. Project was completed in 
June 1953. (For further details, see Annual Report for 
1953.) 
19. STARTUP, WALLACE RIVER, WASH. 
Location. On right bank of Wallace River near its 
junction with Skykomish River in Snohomish County, 
1154

SEATTLE, WASH., DISTRICT 
in northwestern Washington, about 35 miles northeast 
of Seattle. (See Geological Survey quadrangle, Index.) 
Existing project. Levee about 7,000 feet long between 
Skykomish and Wallace Rivers and joining Burlington 
Northern railway embankment at each end, and side 
channels to divert flow away from levee; and training 
levee 2,700 feet long. See table 38-B for authorizing 
legislation. 
Local cooperation. Fully complied with. Local interests 
were required to provide lands, rights-of-way, utility 
relocations and alterations, highway or highway bridge 
construction and alterations, and royalty-free quarry 
and borrow areas for construction; hold the United 
States free from damages and adjust all claims 
concerning water rights; maintain and operate project 
after completion; and prevent future encroachment 
which might interfere with proper functioning of 
project for flood control. Board of County Commissioners 
of Snohomish County fulfilled local cooperation 
requirements as stated in their resolution 
dated August 31, 1964, for the original levee work. By 
resolution adopted March 10, 1969, Snohomish County 
Commissioners agreed to sponsor the training levee 
project and provide all lands, easements, rights-of-way, 
and royalty-free borrow areas necessary for project 
construction; hold the United States free from damages 
and adjust all claims concerning water rights; maintain 
and operate project after completion; and prevent 
future encroachment which might interfere with 
proper functioning of project for flood control. Estimated 
cost of all local cooperation is $23,500. 
Operations and results during the fiscal year. New work, 
contract: Construction of training levee was completed 
in September 1969. 
Condition at end of fiscal year. Project was completed in 
October 1965, except for the training levee, completed 
in September 1969. (For further details, see Annual 
Report for 1966.) 
20. STILLAGUAMISH RIVER, WASH. 
Location. Formed by confluence of its north and south 
forks at Arlington, in northwestern Washington, 
Stillaguamish River flows westerly 22 miles to Puget 
Sound, entering Port Susan through Hat Slough and 
South Pass, and Skagit Bay through West Pass. (See 
Coast and Geodetic Survey Chart 6450, and Geological 
Survey quadrangles Stanwood, Marysville, and Stillaguamish, 
Wash.) 
Existing project. Works to reduce bank erosion and 
channel changes on Stillaguamish River 15 miles 
between Arlington and head of Hat Slough, and on 
Cook Slough, 3 miles long, as follows: Revetment at 26 
places on river and Cook Slough; concrete weir 275 feet 
long between steel-sheet-pile piers at head of Cook 
Slough to limit flow through slough; and two cutoff 
channels, each about 00 feet long, to eliminate sharp 
bends in Cook Slough. Tidal influence extends about 3 
miles into improved section. Flood stages of 16 feet 
above low water at Cook Slough weir have been 
observed. See table 38-B for authorizing legislation. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies. At time of authorization, section 3, 
Flood Control Act of June 22, 1936, applied, and local 
interests complied with its requirements. 
Operations and results during fiscal year. Maintenance, 
hired labor: Repaired 550 linear feet of revetment with 
rock riprap in August 1969 and 100 linear feet in May 
1970. Sprayed brush on 18,500 linear feet of revetment 
in May. 
Condition at end of fiscal year. Project was completed in 
July 1939. (For further details see Annual Report for 
1940.) 
21. TACOMA, PUYALLUP RIVER, WASH. 
Location. Puyallup River has its source in glaciers on 
western slopes of Mount Rainier, Wash., flows northwesterly 
50 miles, and empties into Commencement 
Bay, an arm of Puget Sound, at Tacoma. Work covered 
by this project is on Puyallup River, within city limits 
of Tacoma. (See Coast and Geodetic Survey Chart 
6407.) 
Existing project. A channel with a capacity of 50,000 
second-feet between East 11th Street Bridge and lower 
end of intercounty improvement, a distance of about 
2.2 miles, by straightening channel, building levees, 
revetting channel and levees, and making necessary 
bridge changes. The 11th Street Bridge at lower end of 
project is 0.75 mile above mouth of Puyallup River. 
Diurnal tidal range at mouth of river is 11.8 feet and 
extreme range is 20 feet. Improvement was planned in 
conjunction with Mud Mountain Dam and affords 
protection against floods about 50 percent greater than 
maximum discharge of record. See table 38-B for 
authorizing legislation. 
Local cooperation. None required. 
Operations and results during fiscalyear. New Work, hired 
labor: Engineering studies were started for preparation 
of master plan for recreation facilities. Maintenance, 
hired labor: In February, 50 linear feet of revetment 
was repaired with rock riprap, and 2,700 linear feet was 
repaired with gravel to restore it to project elevation 
and improve access. Brush was controlled on entire 
project by spraying in May and June. 
Condition at end of fiscal year. Project was completed in 
May 1950. (For further details, see Annual Report for 
Location. On Wynoochee River, a tributary of 
Chehalis River, about 28 miles north of Montesano, 
Grays Harbor County, Wash. (See Geological Survey 
quadrangles, Grisdale, Wynoochee Valley, and Montesano.) 
Existing project. Provides for a dam and reservoir of 70, 
000 acre-feet of total storage for water supply, flood 
1155

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
control, irrigation, fish and wildlife, and recreation. 
Estimated cost for new work is $21,500,000 (July 1969). 
See table 38-B for authorizing legislation. 
Installation of power-generating facilities was not 
authorized, pending a reexamination report by the 
Chief of Engineers. In February 1966, the Federal 
Power Commission asserted that power production as 
part of the Wynoochee project is not feasible at this 
time. 
Local cooperation. Local interests must repay all costs 
allocated to water supply, in accordance with the 
Water Supply Act of 1958, as amended. A water supply 
contract was signed in August 1967. Repayment 
estimate is $17,559,000. This reimbursable cost is 
divided into three increments corresponding to three 
increments of storage allocated to water supply, each of 
which must be paid, with interest, within 50 years of 
the first use of that increment of storage. The first 
increment, $10,396,000, is considered non-deferrable, 
with annual payments beginning when the project 
becomes first operable. Local interests must also repay 
such costs allocated to irrigation as are lat er determined 
to be repayable under Federal reclamation 
law; and hold the United States free from damages for 
water-rights claims resulting from construction and 
operation of the project. 
Operations and results during fiscal year. New work, hired 
labor: Engineering and design work continued. Plans 
and specifications for slide-type sluice gates were 
completed. 
New work, contract: Combined contract including 
main dam, upstream fish facilities, access road improvements, 
relocation of Forest Development Road 
2312, and reservoir clearing, awarded in August 1969, 
was 24 percent completed. Contract for construction of 
a commercial powerline into the damsite was completed 
in June 1970. Contract for a fish-hauling truck 
and tank, awarded in March 1970, was 1 percent 
completed. Contract for slide gates, awarded in 
December 1969, was 14 percent completed. 
Condition at end of fiscal year. Project as a whole is 32 
percent complete. 
23. YAKIMA RIVER AT ELLENSBURG, 
WASH. 
Location. Yakima River rises in the Cascade Mountains 
near Snoqualmie Pass and flows southeasterly for 
about 200 miles through Kittitas, Yakima, Benton, and 
Klickitat Counties to a junction with the Columbia 
River near Richland, Washington. (See Geological 
Survey quadrangles Thorp; Ellensburg, North; and 
Ellensburg, South, Washington.) 
Existing project. Provides for a system of levees on both 
banks of the river in the vicinity of Ellensburg. The 
levees would protect the city and adjacent developed 
farmland from inundation by all floods up to that 
having an average recurrence interval of 100 years. 
Estimated cost for new work is $1,997,000 (July 1968), 
including $1,910,000 Federal funds and $87,000 non- 
Federal costs. (See table 38-B for authorizing legislation.) 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, applies. Assurances of local cooperation were 
received from Kittitas County in letters dated November 
17, 1969, and June 8, 1970, in which the county 
agreed to sponsor the project on an interim basis until a 
flood control district can be formed. 
Operations and results during fiscal year. New work, hired 
labor: Restudy of project was underway to determine 
project's feasibility, justification, and local cooperation 
requirements as affected by construction of Interstate 
Highway 90 and changes in land uses and values. 
Restudy was 75 percent complete on June 30. 
Condition at end of fiscalyear. No construction work has 
been done. 
24. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS. 
Inspections are made of Federally constructed local 
flood protection projects which are maintained by local 
interests; and agencies responsible for their operation 
and maintenance are advised of any needed repairs. 
During the fiscal year, inspections were made on 
Chehalis River and tributaries, Deschutes, Hoquiam, 
Nisqually, Nooksack, Sammamish Rivers, and all 
Olympic Peninsula basins, in Washington, in August; 
Coeur d'Alene River and tributaries, Clark Fork, 
Spokane River, and St. Joe River and tributaries, 
Idaho; Rock Creek and Methow and Okanogan Rivers 
and tributaries, Washington; Clark Fork and tributaries 
and Flathead River, Montana, in October; 
Cedar and Green Rivers, Washington, in December; 
Snohomish River and tributaries, Washington, November 
through February; Clark Fork and its tributaries, 
Idaho and Montana, pose ProAlene and its 
tributaries, Kootenai, St. Joe, and Spokane Rivers, 
Idaho; Flathead River, Montana; and Dungeness 
River and Rock Creek, Washington, in April. Fiscal 
year costs were $9,939. Costs to date have been $79,010. 
25. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Flood control storage was reserved in Hungry Horse 
Reservoir, Mont., and Ross Reservoir, Wash., in 
accordance with prescribed rule curves. Guidance 
forecasts were made during the flood control season, as 
required, and monthly reports on operations were 
submitted. Storage for replacement of lost valley 
storage at Upper Baker, Rocky Reach, Priest Rapids 
and Wells Dams, in Washington, was provided in 
accordance with rule curves and flood forecasts. 
Coordination necessary in preparation or revision of 
reservoir regulation manuals was carried on during the 
year with agencies responsible for the operation of these 
projects. Fiscal year costs were $36,196. 
1156

SEATTLE, WASH., DISTRICT 
26. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 38-H. 
27. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 
858, 80th Congress, as amended (preauthorization) 
Fiscal year costs for preauthorization studies were 
$4,067 for Big Quilcene River, Wash.; $2,492 for 
Bitterroot River, Hamilton, Mont.; $678 for Blackfoot 
River, Lincoln, Mont.; $1,546 for Cottonwood Creek, 
Deer Lodge, Mont.; $8,664 for Lake Stevens, Wash.; 
$2,237 for Mill Creek, Cosmopolis, Wash.; $3,176 for 
Pattee Creek, Missoula, Mont.; and $4,750 for Shelton, 
Wash. 
Emergency flood-control activities-repair, flood fighting, 
and rescue work (Public Law 99, 84th Cong., and antecedent 
legislation). Emergency bank protection (sec. 14, 1946 Flood 
Control Act, Public Law 526, 79th Cong.) 
See table 38-I on flood control work under special 
authorization. 
MULTIPLE-PURPOSE PROJECTS 
INCLUDING POWER 
28. -ALBENI FALLS DAM, IDAHO 
Location. Dam is on Pend Oreille River about 25 
miles west of Sandpoint, in northern Idaho, and 50 
miles northeast of Spokane, Wash. Dam is 838 and 90 
miles upstream from mouths of Columbia and Pend 
Oreille Rivers, respectively. (See Geological Survey 
topographic sheets, Sandpoint, Idaho, and Newport, 
Wash.) 
Existing project. Provides flood control, hydroelectric 
power, and related water uses on Pend Oreille River as 
a part of the multiple-purpose plan for development of 
Columbia River Basin, including recreation development. 
At the dam, channel was formerly divided 
by an island and a low waterfall of about 7 feet. Dam is 
a gated, gravity-structure spillway in left channel and a 
powerhouse having an installation of 42,600 kilowatts 
in right channel, creating a reservoir with a usable 
storage capacity of 1,153,000 acre-feet. Estimated cost 
of recreation facilities for completed project is $879,000 
(July 1969). (See table 38-B for authorizing legislation.) 
Local cooperation. None required. 
Operations and results during fiscal year. Code 710 funds: 
New work, hired labor: Engineering studies continued. 
Minor improvements were completed at Trestle Creek, 
Strongs Island, Riley Creek, and Albeni Cove. New 
work, contract: Work was completed on a modern 
sanitary facility at Springy Point. 
Regular funds: Maintenance, hired labor: Reservoir 
was operated through its annual cycle of storage and 
release. Routine structural, mechanical, and electrical 
maintenance was performed on spillway dam, powerhouse, 
and equipment. Maintenance, contract: 
Repair of debris disposal facilities was completed in 
September. 
Condition at end of fiscal year. Project was completed in 
June 1957. (For further details, see Annual Report for 
1957.) Recreation facilities for public use have been 
provided at Albeni Cove, Priest River, Riley Creek, 
Johnson Creek, Trestle Creek, Strongs Island, and 
Springy Point, and planning for additional areas and 
'further development of existing areas is underway. 
29. CHIEF JOSEPH DAM (RUFUS WOODS 
LAKE), WASH. 
Location. On Columbia River in north central 
Washington, at river mile 545, just upstream from 
mouth of Foster Creek, 1.5 miles upstream from town 
of Bridgeport. (Geological Survey topographic sheet 
Okanogan, Wash., shows general locality.) 
Existing project. A straight concrete gravity overflow 
dam, 220 feet high; powerhouse; and intake structure 
with gate bays for 27 generating units. Ultimate 
installed capacity depends on future development of 
upstream storage. Powerhouse has 16 generator units 
installed, and provides superstructure for 17 units and 
substructure for 20 units. All installed units are of 64, 
000 kilowatts capacity. Estimated cost of 11 additional 
units is $137,000,000 (July 1969), and for recreation 
facilities for completed project, $813,000 (July 1969). 
(See table 38-B for authorizing legislation.) 
Local cooperation. None required. Local interests 
contributed estimated value of work and materials of 
$15,000 (July 1959) for bank protection at Brewster, 12 
miles downstream from dam. 
Operations and results during fiscal year. Regular funds: 
New work, hired 1 abor: Engineering and design work 
continued on additional generating units. Work was 
underway on hydraulic model study, pool raising, relief 
tunnel access, and peaking operation effects design 
memoranda. 
Code 710 funds: New work, hired labor: Plans and 
specifications for sanitary dump station at Bridgeport 
State Park were completed. Planning was underway on 
replacement recreation facility for Elmer City, which 
was closed and dismantled because of Coulee Dam 
third powerhouse construction. New work, contract: 
Contract was awarded for installation of sanitary 
dump station at Bridgeport State Park. 
Maintenance, hired labor: Project was operated all 
year, and routine maintenance work was performed. 
Maintenance, contract: Secondary sewage treatment 
plant was about 30 percent completed. 
Condition at end of fiscal year. Project providing initial 
16 power units was completed in fiscal year 1961. (For 
further details, see Annual Report for 1962.) Recreation 
facilities have been provided at the damsite and 
at Bridgeport State Park for public use. Pre- 
1157

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
construction planning for installation of 11 additional 
units is 90 percent complete. 
30. LIBBY DAM AND LAKE, MONT. 
Location. On Kootenai River in Lincoln County, 
Mont., about 17 miles upstream from Libby, and 219 
miles upstream from confluence of Kootenai with 
Columbia River. (See Geological Survey topographic 
sheet, Thompson Lakes, Mont.) 
Existing project. Provides for storage for local flood' 
control protection in Montana and Idaho downstream 
from dam; main stem flood control in Lower Columbia 
River; hydroelectric power generation at-site and at 
downstream plants through storage release; school 
facilities for education of dependents of construction 
personnel, Libby project; participation in construction 
of airport facility at Kelley Flats, Montana; and 
payment of $750,000 to Montana Department of Fish 
and Game for fish hatchery. Recreation development 
will be by U.S. Forest Service. Project will be operated 
as a unit of comprehensive system for improvement of 
Columbia River basin for flood control, navigation, 
hydroelectric power, and other purposes. Straight 
concrete gravity overflow dam will be about 420 feet 
high, with normal full pool at elevation 2459 feet above 
mean sea level. Powerhouse will have an initial 
installed capacity of 420,000 kilowatts from four 
hydroelectric generating units. Reservoir, backing 
water into Canada, will have a usable storage capacity 
of 4,965,000 acre-feet at 50 percent drawdown. 
Construction of dam is in accordance with treaty 
between United States and Canada relating to 
international cooperation in water-resource development 
of Columbia River basin. Cost estimate for 
new work (4 units) is $387 million (July 1969), Corps of 
Engineers funds; and $185,349 Federal Aviation 
Agency funds and $17,500 contributed funds for Kelley 
Flats airport facility. (See table 38-B for authorizing 
legislation.) 
Local cooperation. Participation in construction of 
airport facility at Kelley Flats, Montana, was authorized 
subject to provision by Federal Aviation 
Administration of 53.01 percent of cost, and by Lincoln 
County-City of Libby Joint Airport Board of all funds 
required in excess of $317,649, in accordance with 
agreement dated April 3, 1968. The Federal Aviation 
Administration has provided $185,349, and Lincoln 
County-City of Libby Joint Airport Board has contributed 
$17,500, a total of $202,849. 
Operations and results during fiscalyear. New work, hired 
labor: Major design effort was concentrated on 
reservoir clearing, dam, powerhouse and appurtenant 
structures, and road and town of Rexford relocation. 
Final design was completed on first application, 
seeding of cuts, embankments, and borrow areas; and 
station facilities for the Burlington Northern railway 
relocation; all facilities for relocation of town of 
Rexford except schools and water supply; and initial 
studies of reregulating dam. Design work continued on 
one unit of Forest Development Road and three units 
of Montana State Highway relocation; landscape 
restoration along roads and railway; utilities relocation 
out of reservoir; reservoir clearing; water quality; drift 
control; wildlife habitat improvement; game fish 
mitigation measures; and schools and water supply for 
relocated town of Rexford. Engineering after award 
continued on the dam, reservoir bridge, Forest Development 
Road, Montana State Highway, Burlington 
Northern railway tunnel, tunnel ventilation and 
grading, and miscellaneous other work in progress. 
New work, contract: Construction contracts awarded 
during the fiscal year included: Burlington 
Northern railway, first application, seeding of cuts, 
embankment, and borrow areas; station facilities; 
power supply; Rexford relocation, except for school 
and water supply; reservoir clearing, three contracts; 
evaluation of mitigation measures, Fisher River and 
Wolf and Fortine Creeks; stream habitat development 
at Young Creek; and hydraulic turbines. 
Work continued on contracts in force, as follows: 
Relocation of 52 miles of Montana State Highway 37, 
50 miles of Forest Development Road, and 60 miles of 
Burlington Northern railway; Flathead tunnel, Burlington 
Northern railway; school facilities; reservoir 
clearing; dam; hydraulic turbines; and airport facility 
at Kelley Flats. 
Condition at end of fiscal year. Planning is 99 percent 
complete. Remaining planning includes big game 
habitat development and mitigation measures; continued 
coordination with Canada for water quality 
protection, visitor exhibits at the dam, hydrologic and 
communications facilities, sedimentation investigation, 
and revisions to orders controlling level of Kootenay 
Lake in Canada; hydrology and reservoir operations; 
reregulation dam; and various signs and exhibits for 
tourist consideration. Final design work is 88 percent 
complete. Detailed design work remaining includes 
remainder of Forest Service roads and Montana State 
Highway relocations; Burlington Northern railway 
final seeding; relocation of Rexford ranger station; 
town of Rexford schools and water supply, reservoir 
clearing, drift control facilities, removal and salvage of 
railroad track, stilling basin bridge, powerhouse and 
equipment, remaining access roads, maintenance 
building, powerhouse service area, landscaping in 
vicinity of dam, right abutment upper visitors' area, 
visitors' center modification, and visitors' day-use area. 
Completed items include Canoe Gulch Ranger Station 
and Work Center, cemetery and grave relocation, 
airport facilities at Kelley Flats, and visitors' center 
and resident engineer facility at the damsite. Relocation 
of 52 miles of Montana State Highway 37, 
started in March 1967, is about 10 percent complete. 
Relocation of 50 miles of Forest Development Road to 
the west side of the reservoir, crossing the reservoir near 
Rexford, is about 60 percent complete. Relocation of 
60 miles of Burlington Northern railway is about 77 
1158

SEATTLE, WASH., DISTRICT 
percent complete. The 7-mile Flathead Tunnel was 
completed in November 1969. Construction of school 
facilities to assist the local communities in meeting 
their needs for additional 'classrooms is complete. Dam 
construction is about 66 percent complete. Reservoir 
clearing is about 10 percent complete. Hydraulic 
turbines are 0.3 percent complete. Project as a whole is 
about 50 percent complete. Canada is well underway 
in its reservoir clearing work, and is expected to 
accommodate the initial pool raise to spillway crest 
elevation 2405 by May 1972, with total reservoir work 
completed in December 1972 prior to the raising of the 
full pool to elevation 2459 during May-July 1975. 
31. OTHER AUTHORIZED MULTIPLEPURPOSE 
PROJECTS INCLUDING 
POWER 
See table 38-J. 
GENERAL INVESTIGATIONS 
32. SURVEYS 
Fiscal year costs were $646,479, of which $62,224 
was for comprehensive basin studies, $299,075 was for 
flood control studies, $280,000 was for navigation 
studies, and $5,180 was for special studies. 
33. COLLECTION AND STUDY OF BASIC 
DATA 
The work programmed for collection and study of 
basic data covers international water studies and flood 
plain management services. Work on international 
water studies included checking Kootenay Lake 
storage computations to determine compliance of West 
Kootenay Power & Light Co. with orders of International 
Joint Commission, and coordination with 
International Kootenay Lake, Osoyoos Lake, and 
Skagit River Boards of Control in enforcement of 
International Joint Commission orders. Completed 
flood plain information reports for Columbia Falls- 
Kalispell, Montana, Clark Fork; and Yakima-Union 
Gap, Yakima and Naches Rivers, Washington. Work 
was underway on Aberdeen, Hoquiam, and Cosmopolis, 
Washington, Chehalis River. Technical 
assistance was provided other Federal and non-Federal 
agencies in flood hazard evaluation and related 
services as requested. Fiscal year costs were $5,500 for 
international water studies, and $181,300 for flood 
plain management services, a total of $186,800. (See 
table 38-K on completed flood plain studies.) 
34. RESEARCH AND DEVELOPMENT 
Work programmed for research and development 
consists of storm studies and other hydrologic studies. 
Fiscal year costs of these studies were $9,600. 
1159

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
1. Anacortes Harbor, 
Wash. 
(Federal Funds) 
(Contrib. Funds) 
2. Bellingham Harbor, 
Wash. 
(Federal Funds) 
(Contrib. Funds) 
3. Everett Harbor and 
Snohomish River, 
Wash. 
(Federal Funds) 
(Contrib. Funds) 
4. Grays Harbor and 
Chehalis River, 
Wash. 
(Federal Funds) 
(Contrib. Funds) 
5. Lake Washington 
Ship Canal, Wash. 
6. Mats Mats Bay, Wash. 
(Federal Funds) 
(Contrib. Funds) 
New Work: 
Approp. 
Cost 
Maint.: 1 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 2 
Approp. 
Cost 
Maint.: 1,3 
Approp. 
Cost 
New Work: 4 
Contrib. 
Cost 
Maint.: 
Contrib. 
Cost 
New Work: 5 
Approp. 
Cost 
Maint.: 1,6 
Approp. 
Cost 
New Work: 8 
Contrib. 
Cost 
New Work: 9 
Approp. 
Cost 
Maint.: 10 
Approp. 
Cost 
Minor Rehab.: 11 
Approp. 
Cost 
Major Rehab.: 
Approp. 
Cost 
New Work: 12 
Contrib. 
Cost 
Maint.: 
Contrib. 
Cost 
New Work: 13 
Approp. 
Cost 
Maint.: 14 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
1,018 
.1,018 
3,000 
1,780 
1,799 
1,799 
6,256 
9,971 
3,873 
3,873 
58,117 
9,581 
22,050 
- 
258,000 
213,036 
880,000 
852,260 
1,850,000 
2,168,393 
6,320 164,061 
51,571 164,061 
3,853 
3,853 
25,048 
73,584 
-12,947 
9,103 
52,000 
20,302 
353,186 
166,370 
904,436 773,319 1,459,921 
860,606 830,967 1,375,118 
-43,885 
2,098 
756,700 781,768 
795,372 694,128 
193 
2,595 
4,754 
4,771 
769,041 
925,888 
115,000 
3,502 
26,100 
881,720 
788,964 
105,440 
2,188 
28,288 
1160 
TABLE 38-A 
- - 
47,889 
47,889 
4,024,297 
4,024,297 
15,886,787 
15,790,032 
143,947 
137,679 
28,288 
28,288 
$ 222,345 
222,345 
102,053 
102,053 
59,523 
59,523 
1,566,840 
1,566,840 
352,724 
352,724 
31,581 
31,581 
9,103 
9,103 
1,775,744 
1,744,046 
1,530,990 
1,344,174 
5,618 
5,618 
5,030,851 
5,030,851 
23,539,402 
23,435,355 
120,592 
120,592 
4,606,145 
4,606,145 
35,834 
35,834

TABLE 38-A (Cont'd) 
SEATTLE, WASH., DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
7. Puget Sound and its 
Tributary Waters, 
Wash. 
8. Quillayute River, 
Wash. 
(Federal Funds) 
(Contrib. Funds) 
9. Sammamish River, 
Wash. 
10. Swinomish Channel, 
Wash. 
11. Willapa River and 
Harbor and Naselle 
River, Wash. 
(Federal Funds) 
(Contrib. Funds) 
16. Columbia River 
Basin, Local Protection 
Projects, 
Idaho, Mont., and 
Wash. 
17. Howard A. Hanson 
Dam, Wash. 
(Federal Funds) 
(Contrib. Funds) 
18. Mud Mountain Dam, 
Wash. 
19. Startup, Wallace 
River, Wash. 
New Work: 
Approp. 
Cost 
Maint.: 15 
Approp. 
Cost 
New Work: 16 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 17 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 18 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 19 
Approp. 
Cost 
Maint.: 20 
Approp. 
Cost 
New Work: 21 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 22 
Approp. 
Cost 
Maint.: 25 
Approp. 
Cost 
Minor Rehab.: 
Approp. 
Cost 
New Work: 26 
Approp. 
Cost 
$ - $ - 
226,100 219,176 
209,465 232,348 
60,000 
79,489 
5,723 
100,661 
100,417 
538,339 
494,088 
-670 
206,789 
174,412 
28,750 
27,581 
130,411 
133,478 
86,510 
112,664 
3,000 
4,600 
107,328 
51,504 
274,915 
326,296 
287,343 
291,486 
71,297 
72,397 
- 20,000 
26 1,307 
113,959 138,910 
168,837 88,635 
656,041 626,229 
375,337 862,339 
-8,000 - 
292 - 
146,117 935,457 
201,533 818,602 
5,000 
2,887 
191,551 
183,588 
745 
157,407 
164,746 
40,000 
9,311 
1161 
267,176 
267,157 
131,514 
22,656 
$ 43,337 
43,337 
4,924,228 
4,924,153 
521,850 
521,850 
1,453,046 
1,344,188 
20,000 
20,000 
35,000 
15,281 
808,332 
808,332 
2,404,756 
2,353,291 
1,579,269 
1,579,269 
7,885,102 
7,838,370 
71,775 
71,775 
445,538 
445,538 
37,048,061 
37,048,061 
2,122,212 
2,112,149 
2,000,000 
2,000,000 
13,241,81323 
13,239,81224 
3,201,309 
3,178,788 
285,908 
285,908 
271,713 
271,713 
170,895 
332,761 
536 
244,728 
223,941 
-8,437 
22,252

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 38-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
20. Stillaguamish River, New Work: 27 
21. Tacoma, Puyallup 
River, Wash. 
22. Wynoochee Lake, 
Wash. 
23. Yakima River at 
Ellensburg, Wash. 
28. Albeni Falls Dam, 
Idaho 
29. Chief Joseph Dam 
(Rufus Woods Lake), 
Wash. 
30. Libby Dam and Lake, 
Mont. 
(Federal Funds) 
(Contrib. Funds) 
Wash. $ 220,594 
220,594 
18,800 
5,889 
1,000 
1,271 
14,608 
35,384 
4,049 
9,330 
12,748 
12,748 
11,042 
11,042 
14,600 
14,600 
9,000 
193 
10,922 
10,922 
560,000 1,141,500 1,500,000 1,190,000 
494,950 1,116,931 588,118 2,236,051 
- - - 14,300 
- - - 14,300 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Major Rehab.: 
Approp. 
Cost 
SNew Work:34 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
- -29,000 
67,627 18,689 
431,979 
412,141 
305,000 
308,089 
489,146 
504,361 
551,343 
551,343 
3,951,81828 
3,943,01129 
80,372 
80,372 
5,091,145 
5,057,593 
14,300 
14,300 
31,367,89030 
31,331,14331 
5,721,786 
5,706,272 
453,500 146,006,71232 
471,061 145,883,02633 
1,018,500 1,115,453 1,103,238 1,328,763 
1,020,552 1,120,616 1,143,589 1,250,881 
-280,000 
279,837 
29,300,000 
28,800,276 
-22,370 
- 
54,312,000 51,026,275 54,803,630 
56,294,876 51,053,986 54,894,512 
17,500 - - 
--- 15,910 
14,968,184 
14,884,351 
297,630 
297,630 
204,182,743 
204,003,850 
17,50035 
15,910 
1. Includes applicable portion of Reconnaissance and Condition 
Surveys appropriations and costs. 
2. Includes $56,582 for previous projects. Excludes $13,000 
Coast Guard funds expended. 
3. Includes $1,092 for previous projects. 
4. Excludes $2,157,473 expended by the Port of Bellingham 
in fulfilling requirements of local cooperation. 
5. Includes $418,209 for previous projects. Excludes 
$43,000 Coast Guard funds expended. 
6. Includes $5,869 for previous projects. 
7. Excludes $44,000 contributed funds expended for maintenance 
dredging for local interests. 
8. Excludes estimated other non-Federal costs of $256,000 
(July 1962) for dredging and relocations. 
9. Includes $113,134 for previous projects. Excludes 
$162,000 Navy funds and $6,000 Coast Guard funds expended. 
10. Includes $37,415 for previous projects. 
11. Includes $111,000 Public Works Acceleration Act funds. 
12. Excludes $1,263,000 expended by local interests in 
fulfilling requirements of local cooperation. 
13. Includes $485,002 for previous projects, and $192,516 
Public Works Administration funds. Excludes expenditures of 
$246,567 by State of Washington and $742,071 by King County 
in excavation of channel above the locks and in construction of 
concrete revetment at the portage. 
14. Includes $1,631,195 expended between 1916 and 1936 
on operation and care of works of improvement, under 
provisions of the permanent indefinite appropriation for such 
purposes. 
15. Includes $67,496 for previous project. 
16. Excludes Navy funds expended on dredging river channel 
in 1944; and Coast Guard funds expended for channel dredging 
in 1948 and 1949. 
17. Excludes non-Federal costs of $46,000 for mooring 
facilities and a public landing constructed by Port of Port 
Angeles. 
18. Excludes $1,000 Coast Guard funds expended; and 
$41,000 non-Federal costs, including $32,000 for rock disposal 
and $9,000 for lands and damages. 
1162 
89,250 150,000 
60,391 68,117 
395,400 440,661 
403,187 441,757 
476,250 350,000 
312,564 369,349 
-- 
$ - a

SEATTLE, WASH., DISTRICT 
COST AND FINANCIAL STATEMENT 
19. Includes $228,084 for previous projects. Excludes 
$40,000 Coast Guard funds expended. 
20. Includes $309,177 for previous projects. 
21. Includes $6,597 for previous project; excludes $111,000 
estimated non-Federal costs for lands and damages, bulkheads, 
moorage facilities at Nahcotta and Tokeland, and breakwater at 
Tokeland. 
22. Includes $26,000 Emergency Relief funds. 
23. Includes $33,750 Code 710 funds for recreation on 
completed project. 
24. Includes $31,749 Code 710 funds for recreation on 
completed project. 
25. Excludes $3,928 contributed by Weyerhaeuser Timber 
Co. for added cost of increasing clearance of new access road 
bridge. 
26. Excludes $23,500 non-Federal costs for rights-of-way, 
borrow pit, and quarry royalty. 
27. Includes $85,999 Emergency Relief funds. Excludes 
$5,000 provided by State of Washington for use in securing 
lands, easements, and rights-of-way to meet requirements for 
local cooperation. 
28. Includes $9,000 Code 711 funds for recreation on 
completed project. 
29. Includes $193 Code 711 funds for recreation on completed 
project. 
30. Includes $136,736 Public Works Acceleration Act funds 
and $461,540 Code 710 funds for recreation on completed 
project. 
31. Includes $136,736 Public Works Acceleration Act funds 
and $424,793 Code 710 funds for recreation on completed 
project. 
32. Includes $1,479,000 for 11 additional generator units; 
and $58,000 Public Works Acceleration Act funds and $131,460 
Code 710 funds for recreation on completed project. 
33. Includes $1,387,924 for 11 additional generator units; 
and $58,000 Public Works Acceleration Act funds and $98,850 
Code 710 funds for recreation on completed project. 
34. Includes $132,300 for airport facility at Kelley Flats, 
Mont., in FY 1968. 
35. Excludes $1,200,000 contributed by Lincoln County 
School District No. 4 and the Libby High School District for 
that portion of Libby Junior High School which is in excess of 
classrooms necessary for impact families occasioned by construction 
of the Libby project. Also excludes $210,000 contributed 
by Eureka Elementary School District No. 13 for construction 
of the second addition to Eureka Elementary School, in excess 
of those facilities required for impact families occasioned by 
construction of the Libby project. Excludes $185,349 funds 
provided by Federal Aviation Agency for construction of Kelley 
Flats airport facility. 
1163 
TABLE 38-A (Cont'd)

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Work Authorized D 
ANACORTES HARBOR, WASH. (See Section 1 of Text) 
Channel in Capsante Waterway1 H. Doc. 111 
Sess. 
Mooring Basin S. Doc. 102 
Sess. 2 
BELLINGHAM HARBOR, WASH. (See Section 2 of Text) 
Whatcom Creek Waterway 26- and 18-Foot Channels 
Entrance Channel in Squalicum Creek Waterway 
Maintenance of Southerly Half and Westerly End of Squalicum 
Creek Basin 
Small-Boat Basin Adjacent to Squalicum Creek Waterway 
Whatcom Creek Waterway, 30-Foot Channel 
ocuments 
7, 64th Cong., 1st 
,83d Cong., 2d 
H. Doc. 1161, 60th Cong., 
2d Sess. 
H. Doc. 187, 70th Cong., 1st 
Sess. 
Rivers and Harbors Committee Doc. 
70, 74th Cong., 1st Sess. 3 
H. Doc. 558, 82d Cong., 2d 
Sess. 4 
S. Doc. 46, 85th Cong., 1st 
Sess. 5 
Mar. 2, 1919 
Sept. 3, 1954 
June 25, 1910 
July 3, 1930 
Aug. 26, 1937 
Sept. 3, 1954 
July 3, 1958 
June 25, 1910 
July 3, 1930 
June 20, 1938 
Sept. 3, 1954 
July 14, 1960 
Aug. 13, 1968 
June 3, 1896 
Mar. 2, 1907 
Mar. 2, 1907 
June 25, 1910 
June 25, 1910 
Aug. 8, 1917 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 1935 
Aug. 30, 1935 
16-Foot Channel From Cosmopolis to Montesano 6 
Reconstruct North and South Jetties to an Elevation of 
16 Feet Above Mean Lower Low Water 
Maintain 26-Foot Channel Below Aberdeen (as Authorized by 
Public Works Administration Dec. 11, 1933) and Combining 
Projects for Grays Harbor and Bar Entrance and Grays 
Harbor, Inner Portion, and Chehalis River Under a Modified 
Project for Grays Harbor and Chehalis River 
7- 
Sess. 
H. Doc. 582, 69th Cong., 2d 
Sess. 
H. Doc. 315, 70th Cong., 1st 
Sess. 
Rivers and Harbors Committee Doc. 
2, 74th Cong., 1st Sess. 
H. Doc. 53, 73d Cong., 1st Sess.; 
Rivers and Harbors Committee 
Doc. 2, 74th Cong., 1st Sess. 
1164 
TABLE 38-B 
Acts 
EVERETT HARBOR AND SNOHOMISH RIVER, WASH. (See Section 3 of Text) 
Training Dike 10,500 Feet Long Extending Across Bar at H. Doc. 1108, 60th Cong., 2d 
Outlet of Old River Channel Sess. 
Raise 6,000 Feet of Training Dike, Extend Spur Dike, Widen H. Doc. 377, 71st Cong., 2d 
Gap in Dike as Required, Maintain East Waterway and Channel Sess. 
to Gap 
Abandon Project for Snohomish River and Provide Settling H. Doc. 546, 75th Cong., 3d 
Basin Near 14th Street Sess. 
Spur Dike at Preston Point, Remove Training Dike North H. Doc. 569, 81st Cong., 2d 
of River Outlet, Enlarge Channel to 14th Street, and Sess. 
Deepen Settling Basin 
Widen Channel From Settling Basin to Gap; Extend Channel to H. Doc. 348, 86th Cong., 2d 
Head of Steamboat Slough; and a Settling Basin Within Sess. 2 
Upper Channel Reach 
Raise and Extend Existing Training Dike; and Construct H. Doc. 357, 90th Cong., 2d 
Breakwater on Westerly and Southerly Sides of 14th Street Sess. 2 
Small-Boat Basin 
GRAYS HARBOR AND CHEHALIS RIVER, WASH. (See Section 4 of Text) 
South Jetty Annual Report, 1895, pp. 351 
3533 
A North Jetty 9,000 Feet Long Rivers and Harbors Committee 
Doc. 2, 59th Cong., 2d Sess. 
The 18-Foot Channel H. Doc. 507, 59th Cong., 1st 
Sess. 
Extend North Jetty 7,000 Feet; Length of South Jetty Fixed Rivers and Harbors Committee 
at 13,734 Feet Doc. 29, 61st Cong., 2d Sess. 
A 6-Foot Channel Above Cosmopolis H. Doc. 1125, 60th Cong., 2d 
Sess. 
Dredging in Bar Channel H. Doc. 1729, 64th Cong., 2d

TABLE 38-B (Cont'd) 
SEATTLE, WASH., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 2, 1945 Maintain 30-Foot Depth in Channel From Deep Water in Grays 
Harbor to Port of Grays Harbor Commission Terminal, Which 
was Deepened From 26 to 30 Feet with Navy Funds 
14-Foot Channel to Bay City; Breakwater at Westhaven; 
Protection of Point Chehalis; and Maintenance of Westhaven 
Entrance Channel 7 
Dredging and Maintenance of a 30-Foot Channel and Turning 
Basin from Aberdeen to Cosmopolis 
Additional Breakwater, 1,400 Feet Long, at Westhaven Cove 
LAKE WASHINGTON SHIP CANAL, WASH. (See Section 5 of Text) 
For a Double Lock and Fixed Dam with Gated Spillway and 
Necessary Accessory Works at Entrance to Salmon Bay; 
Dredging a Channel from Locks to Deep Water in Puget Sound, 
and Excavation by Local Interests of a Channel from Locks 
into Lake Washington 
Dredging Below Locks and Revetting Canal Banks 
Increased Dimensions of Channel Between Puget Sound and Locks 
and a 600-Foot Extension of Lower Guide Pier 
Operating and Care of Locks and Dam Provided for with Funds 
from War Department Appropriations for Rivers and Harbors 
Enlarge Channel Between Locks and Lake Washington 
June 30, 1948 
Sept. 3, 1954 
Sept. 3, 1954 
June 25, 1910 
Mar. 4, 1913 
Aug. 8, 1917 
Sept. 22, 1922 
June 26, 19348 
Aug. 30, 19359 
July 14, 1960, 
As Amended 
(Sec. 107)10 
July 13, 1892 
July 3, 1930 
Mar. 2, 1945 
Sept. 3, 1954 
July 14, 1960, 
As Amended 
(Sec. 107)13 
July 13, 1892 
Aug. 30, 1935 
Oct. 23, 1962 
July 27, 1916 
1165 
451-584 0-72-74 
Report in Office, Chief of 
Engineers 
H. Doc. 635, 80th Cong., 2d 
Sess. 
H. Doc. 412, 83d Cong., 2d Sess. 
H. Doc. 30, 84th Cong., 1st 
Sess. 2 
H. Doc. 953, 60th Cong., 1st 
Sess. 
H. Doc. 800, 64th Cong., 1st 
Sess. 
H. Doc. 324, 67th Cong., 2d 
Sess. 
H. Doc. 140, 72d Cong., 1st 
Sess. 2 
MATS MATS BAY, WASH. (See Section 6 of Text) 
Construct and Maintain Entrance Channel Detailed Project Report in 
Office, Chief of Engineers 
PUGET SOUND AND ITS TRIBUTARY WATERS, WASH. (See Section 7 of Text) 
Maintenance of the Rivers Tributary to Puget Sound by Annual Report for 1893, page 
Snagging and Dredging; and Removal of Floating Debris from 3425.11 
Seattle Harbor 
QUILLAYUTE RIVER, WASH. (See Section 8 of Text) 
Jetty (5 Feet High) on Easterly Side of Mouth, and a Dike H. Doc. 125, 71st Cong., 1st 
with Groins, on Westerly Side, to Stabilize Entrance1 Sess. 
Maintenance Dredging to Provide a Channel 6 Feet Deep and H. Doc. 218, 78th Cong., 1st 
of Suitable Width from Ocean to Within River Mouth Sess. 
Raising Jetty to 15 Feet; Channel 10 by 100 Feet, 2,000 Feet H. Doc. 579, 81st Cong., 2d 
Long; Moorage Basin 12 Sess. 2 
SAMMAMISH RIVER, WASH. (See Section 9 of Text) 
Dredging Channel to Provide Full Access to the Sammamish Detailed Project Report in 
River from Lake Washington Office, Chief of Engineers 
SWINOMISH CHANNEL, WASH. (See Section 10 of Text) 
Channel 4 Feet Deep and 100 Feet Wide, and Dike H. Doc. 31, 52d Cong., 1st Sess. 
Construction and Annual Report, 1892, p. 
2752. 
Enlargement of Channel to Present Project Dimensions S. Committee Print, 73d Cong., 
1st Sess. 
Removal of Navigation Hazards at "Hole-in-the-Wall" H. Doc. 499, 87th Cong., 2d 
Sess. 2 
WILLAPA RIVER AND HARBOR AND NASELLE RIVER, WASH. (See Section 11 of Text) 
Channel 24 Feet Deep, 200 Feet Wide, in Willapa River, and H. Doc. 706, 63d Cong., 2d 
150 Feet Wide in the Forks Sess.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 38-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 30, 193514 
Aug. 30, 193515 
Mar. 2, 1945 
Sept. 3, 1954 
May 17, 1950 
May 17, 1950 
Aug. 6, 195816 
June 22, 1936 
Dec. 22, 1944, 
As Amended 
June 30, 1948, 
As Amended 
(Sec. 205)17 
June 22, 1936 
June 22, 1936 
Dec. 22, 1944, 
As Amended 
Oct. 23, 1962 
May 17, 195018 
Oct. 27, 1965 
May 17, 1950 
Dec. 22, 1944, 
As Amended 
July 24, 1946 
June 30, 194819 
Maintenance of Channel Over Bar to a Depth of 26 Feet and 
Minimum Width of 500 Feet 
For Cutoff Channel at Narrows 
Channel from Deep Water in Palix River to Bay Center Dock 
Widen Willapa River Channel to 360 and 250 Feet Between South 
Bend and the Forks; Tokeland and Nahcotta Basins; and 
Naselle River Clearance 
COLUMBIA RIVER BASIN, LOCAL PROTECTION PROJECTS, 
IDAHO, MONT., AND WASH. (See Section 16 of Text) 
Local Flood Protection Works in Columbia River Basin 
HOWARD A. HANSON DAM, WASH. (See Section 17 of Text) 
Eagle Gorge Flood Control Dam on Green River 
Redesignation of Project as Howard A. Hanson Dam 
MUD MOUNTAIN DAM, WASH. (See Section 18 of Text) 
Flood Control Dam on White River 
Construction, Operation, and Maintenance of Recreation 
Facilities 
STARTUP, WALLACE RIVER, WASH. (See Section 19 of Text) 
Flood Control Levees 
STILLAGUAMISH RIVER, WASH. (See Section 20 of Text) 
Improvement of Flood Channel by Clearing and Bank Revetment 
at 26 Places; Concrete Weir at Head of Cook Slough; and 2 
Cutoff Channels in Cook Slough 
TACOMA, PUYALLUP RIVER, WASH. (See Section 21 of Text) 
Channel Improvement to Protect People and Industrial 
Section of City of Tacoma 
Construction, Operation, and Maintenance of Recreation 
Facilities 
WYNOOCHEE LAKE, WASH. (See Section 22 of Text) 
Dam and Reservoir for Water Supply, Flood Control, Irrigation, 
Fish and Wildlife, and Recreation 
YAKIMA RIVER AT ELLENSBURG, WASH. 
(See Section 23 of Text) 
System of Flood Control Levees 
Extended Project Expiration Date to June 10, 1970 
ALBENI FALLS DAM, IDAHO (See Section 28 of Text) 
Multi-Purpose Dam with Powerhouse 
Construction, Operation, and Maintenance of Recreation 
Facilities 
CHIEF JOSEPH DAM (RUFUS WOODS LAKE), WASH. 
(See Section 29 of Text) 
Multi-Purpose Dam and Powerhouse on Columbia River at 
Foster Creek 
Redesignation of the Project as Chief Joseph Dam 
Rivers and Harbors Committee 
Doc. 41, 72d Cong., 1st Sess. 
Rivers and Harbors Committee 
Doc. 37, 73d Cong., 2d Sess. 
H. Doc. 481, 76th Cong., 2d Sess. 
H. Doc. 425, 83d Cong., 2d 
Sess. 2 
H. Doc. 531, 81st Cong., 2d 
Sess. 
H. Doc. 271, 81st Cong., 1st 
Sess. 2 
S. Comm. Print, Puyallup River, 
Wash., 74th Cong., 2d Sess. 
Detailed Project Report in 
Office, Chief of Engineers 
H. Doc. 657, 71st Cong., 3d 
Sess. 2 
S. Comm. Print, Puyallup River, 
Wash., 74th Cong., 2d Sess.2 
H. Doc. 601, 87th Cong., 2d 
Sess. 2 
H. Doc. 531, 81st Cong., 2d 
Sess. 2 
S. Doc. 9, 81st Cong., 1st 
Sess. 2 
H. Doc. 693, 79th Cong., 2d 
Sess. 2 
1166

TABLE 38-B (Cont'd) 
SEATTLE, WASH., DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 9, 195220 Designation of Reservoir as Rufus Woods Lake 
Dec. 22, 1944, Construction, Operation, and Maintenance of Recreation 
As Amended Facilities 
LIBBY DAM AND LAKE, MONT. (See Section 30 of Text) 
May 17, 1950 Multi-Purpose Dam and Powerhouse H. Doc. 531, 81st Cong., 2d 
Sess. 2 
Nov. 7, 196621 School Facilities for Education of Dependents of 
Construction Personnel, Libby Project 
Jan. 2, 196822 Airport Facility at Kelley Flats, Mont. 
Aug. 13, 196823 Design Standards for Relocation of Montana State Highway 37 
to Be Those Adopted by State of Montana Pursuant to 
Provisions of Highway Safety Act of 1966 
June 19, 197024 Participation with State of Montana in Construction, 
Operation and Maintenance of Fish Hatchery Facilities 
1. A portion inactive. 
2. Contains latest published map. 
3. Contains latest published map of Squalicum Creek Waterway.
4. Contains latest published map of small-boat basin. 
5. Contains latest published map of Whatcom Creek Waterway.
6. Inactive. 
7. A portion deferred. 
8. Permanent Appropriations Repeal Act. 
9. Included in the Public Works Administration Program, 
Sept. 6, 1933. 
10. Authorized by Chief of Engineers December 13, 1967. 
11. Annual Report for 1913 contains latest published map 
(page 3127). 
12. Maintenance of these items, as well as sandspit north of 
James Island, is included in this modification. 
13. Authorized by Chief of Engineers May 13, 1968. 
14. Included in Public Works Administration Program, De< 
11, 1933. 
15. Included in Emergency Relief Program, May 28, 1935. 
16. P.L. 85-592. 
17. Authorized by Chief of Engineers December 6, 1963 an 
October 7, 1968. 
18. Conditionally authorized project, subject to establis] 
ment of economic justification. Report on Yakima River an 
Tributaries dated September 15, 1956, established economi 
justification. 
19. P.L. 858, 80th Congress, 2d Sess. 
20. P.L. 469, 82d Congress, 2d Sess. 
21. P.L. 89-789. 
22. Section 502 of P.L. 90-239, Supplemental Appropriatio 
Act of 1968. 
23. Section 212 of P.L. 90-483, Flood Control Act of 196 
24. Section 7 of P.L. 91-282, River Basin Monetary Autho 
zation and Miscellaneous Civil Works Amendments Act of 197 
1167

'ABLE 38-C 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARIIY 1970 
TOTAL COST OF EXISTING PROJECT TO JUNE 30, 1970 
Section Project Funds New Work Maintenance Rehabilitation Total 
4 Grays Harbor and Regular $4,917,717 $22,931,280 $4,615,737 $32,464,734 
Chehalis River, Public Works - 57,000 - 57,000 
Wash. 
Public Works 
Acceleration Act - - 111,000 111,000 
Emergency Relief - 409,660 - 409,660 
U.S. Coast Guard 6,000 - - 6,000 
U.S. Navy 162,000 - - 162,000 
Total, U.S. 5,085,717 23,397,940 4,726,737 33,210,394 
Contributed 35,834 47,889 - 83,723 
Total, All $5,121,551 $23,445,829 $4,726,737 $33,294,117 
11 Willapa River and Regular $1,158,871 $ 7,751,660 - $ 8,911,531 
Harbor and Naselle Public Works - 78,533 - 78,533 
River, Wash. 
U.S. Coast Guard 40,000 - - 40,000 
Emergency Relief 192,314 - - 192,314 
Total, U.S. 1,391,185 7,831,193 - 9,222,378 
Contributed 71,775 - - 71,775 
Total, All $1,462,960 $ 7,831,193 - $ 9,294,153 
ABLE 38-D LAKE WASHINGTON SHIP CANAL, WASH. 
PRINCIPAL FEATURES OF DOUBLE LOCK AND DAM 
(See Section 5 of Text) 
Section Large Lock Small Lock 
Miles Above Mouth 1-1/4 1-1/4 
Clear Width of Chamber Feet 80 28 
Maximum Available Length Feet 760 123 
Lift Feet 26 26 
Depth on Upper Miter Sill1 Feet 36 16 
Depth on Intermediate Miter Sill2 Feet 29 - 
Depth on Lower Miter Sill2 Feet 29 16 
Character of Foundation Clay Clay 
Kind of Dam Fixed Dam With Gated Spillway. Fixed Dam With Gated Spillway. 
Type of Construction Concrete. Concrete. 
Year Completed 1916 1916 
Cost 
1. Low Water in Upper Pool. 
2. Mean Lower Low Water in Puget Sound. 
3. Cost of Double Lock and Dam was $2,224,712 and the 
Emergency Gates, completed in 1923, $174,693. 
1168

SEATTLE, WASH., DISTRICT 
RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 12 of Text) 
Date Survey Conducted 
Washington: 
Blaine Harbor 
Edmonds Harbor 
Hammersley Inlet 
Hoquiam River 
Kingston Harbor 
Lake Crockett 
Neah Bay 
Olympia Harbor 
Port Angeles Harbor 
Port Gamble Harbor 
Port Orchard Bay 
Port Townsend 
Seattle Harbor 
Shilshole Bay, Seattle 
Skagit River 
Tacoma Harbor 
Waterway connecting Port Townsend and Oak Bay 
April 1970 
June 1970 
March 1970 
February 1970 
June 1970 
April 1970 
February 19701 
March 1970 
June 1970 
March 1970 
June 1970 
June 1970 
January and February 1970 
March 1970 
July 1969 
November 1969, April and May 1970 
March 1970 
1. Field Inspection, Only. 
1169 
TABLE 38-E 
Project 
I

TABLE 38-F 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 13 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Bellingham Harbor, Wash. (I&J Street 
Waterway) 2 ,3 1966 $125,634 $ - 
Blaine Harbor, Wash.2 1958 346,650 10,407 
Columbia River, Wenatchee to Kettle Falls, 
Wash.2 1923 274,3904 7,693 
Edmonds Harbor, Wash.5 1966 - 3,458 
Flathead River, Mont.2 1901 9,811 
Hammersley Inlet, Wash. 1950 9,000 17,061 
Hoquiam River, Wash.2 1950 51,294 9,768 
Kingston Harbor, Wash.2 1967 262,5706 2,468 
Kootenai River, Idaho and Mont.2 1933 9,255 5,643 
Lake Crockett, Wash.2 1967 260,240 162,427 
Neah Bay, Wash.2 1968 2,057,266 253,878 
Olympia Harbor, Wash. 1963 461,9797 187,8088 
Polson Bay, Flathead Lake, Mont.2 1918 4,491 259 
Port Angeles Harbor, Wash. 1960 470,873 20,105 
Port Gamble Harbor, Wash. 1953 11,9119 24,907 
Port Orchard Bay, Wash.2 1928 42,804 2,291 
Port Townsend, Wash.2 1965 480,89910 4,217 
Seattle Harbor, Wash. 1969 170,33511 2,152,385 
Shilshole Bay, Seattle, Wash.2 1962 2,575,091 8,655 
Skagit River, Wash. 1950 102,33012 52,198 
Stillaguamish River, Wash. 1946 4,23413 - 
Tacoma Harbor, Wash. 1969 2,435,50014 539,8271s 
Waterway connecting Port Townsend and Oak Bay, 
Wash.2 1964 73,322 142,026 
1. Includes applicable portion of reconnaissance and condition 
survey costs. 
2. Completed. 
3. Authorized by Chief of Engineers under authority of 
section 107, Public Law 86-645. 
4. Includes $8,005 funds expended for previous project. 
5. Completed by local interests. 
6. Excludes $117,584 contributed funds expended. 
7. Includes $183,257 expended for previous projects; and 
$10,962 expended in fiscal year 1970 for restudy. 
8. Includes $14,418 expended for previous projects. 
9. Excludes $21,260 contributed funds expended. 
10. Excludes $85,223 contributed funds expended. 
11. Excludes $69,333 contributed funds expended. 
12. Includes $2,500 expended for previous project. 
13. For economic study, only. 
14. Excludes $62,697 value in work contributed by Port of 
Tacoma, and $496,884 contributed funds expended. Includes 
$159,584 Federal funds expended for previous project. 
15. Includes $5,347 expended for previous project. 
1170

SEATTLE, WASH., DISTRICT 
TABLE 38-.G COLUMBIA RIVER BASIN, LOCAL PROTECTION PROJECTS, IDAHO, MONT., AND WASH. 
AND WASH. PROJECTS ELIGIBLE FOR SELECTION 
(See Section 16 of Text) 
Estimated Estimated 
Federal Non-Federal 
Project Cost Cost 
Lightning Creek, Clark Fork, Idaho $ 42,7261 $ 2,000 
Clark Fork at Missoula, Mont. 377,0121 69,000 
St. Regis River, Mont. 85,000 
Crab and Wilson Creeks, Wash.2 
Entiat River, Wash. 139,000 
Methow River, Wash. 364,000 
Okanogan River, Wash. 197,000 
Wenatchee River, Wash. 137,000 
Yakima River at Ellensburg, Wash.4 1,910,000 87,000 
1. Actual. 3. Not yet evaluated. 
2. Project expired. 4. Reported in detail in an individual report. 
TABLE 38-H OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 26 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
American Lake, Vicinity of Fort Lewis, 
Wash.1',2 1957 $ 59,5823 $ - 
Calispell Creek, Wash.4 1968 25,000 
Coeur d'Alene, Spokane River, Idaho2 1942 152,872 
Columbia River Basin, Local Protection 
Projects, Idaho, Mont., and Wash.: 
Clark Fork at Missoula, Mont.2 1968 377,012 
Entiat River, Wash. 1958 
Lightning Creek, Clark Fork, Idaho2 1959 42,726 
Methow River, Wash. 1958 
Okanogan River, Wash. 1958 1,100 
St. Regis River, Mont. 1958 1,400 
Wenatchee River, Wash. 1958 
Dungeness River, Clallam County, Wash.1,2 1964 392,106 
Mission Creek at Cashmere, Wash.1 1955 10,856 
Raymond, Willapa River, Wash. 1950 31,7385 
St. Maries, St. Joe River, Idaho2 1942 357,698 
Sammamish River, Wash.2 1967 2,582,5366 
Skagit River, Wash. (Avon Bypass) 1968 54,468 
Skagit River, Wash. (Levee and Channel 
Improvements) 1967 
Spokane, Spokane River, Wash. 1939 2,944 
Upper Puyallup River, Wash.2 1938 71,495 
Yakima, Yakima River, Wash.2 1948 381,961 
1. Authorized by Chief of Engineers under authority of 
section 205, Public Law 858, 80th Congress, as amended. 
2. Completed. 
3. Excludes $10,000 contributed funds expended. 
4. Project expired October 27, 1968, because of failure of 
Public Utility District to start construction. 
5. Includes $356 expended in Fiscal Year 1970 for restudy. 
Local interests were notified October 13, 1967, that the project 
will expire in 5 years if formal assurances of local cooperation 
are not furnished. 
6. Excludes $689,523 contributed funds expended. 
1171

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
FABLE 38-I FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
(See Section 27 of Text) 
Project Federal Cost 
EMERGENCY FLOOD CONTROL ACTIVITIES 
Advance preparation $43,964 
Flood emergency operations 7,200 
Repair and restoration: 
Cherry Creek near Duvall, Wash. 11,867 
Kootenai River near Bonners Ferry, Idaho 40,434 
Nooksack River near Marietta, Wash. 7,579 
Snohomish River, Wash. (Ebey Slough, Diking District 6) 40,369 
Snohomish River, Wash. (Ebey Slough, Diking District 13) 17,749 
Unfavorable miscellaneous investigations 3,000 
EMERGENCY BANK PROTECTION 
Chehalis River, Wash., City of Chehalis Raw Water Pumphouse, right banks 5,230 
Clearwater River, Wash., Jefferson County Road, left bank, about 5 miles 
northeast of Queets2 -740 .Pine Creek, Orondo, Wash. 3 
957 
Snohomish River, Wash., Lowell-Snohomish River Road, left bank, about 
4 miles upstream of Lowell4 11,916 
Wynoochee River, Wash., left bank, about 3 miles northwest of Montesano s 43,153 
1. Completed in November 1966. 4. Completed in June 1969. 
2. Completed in September 1968. 5. Completed in September 1969. 
3. Unfavorable investigation. 
FABLE 38-J OTHER AUTHORIZED MULTIPLE-PURPOSE PROJECTS INCLUDING POWER 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
iest Rapids Dam, Columbia River, Wash. 1954 $ 350,0001 $ - 
1. Partnership planning. Excludes funds expended for acquiition 
of lands under partnership arrangement for Priest Rapids 
nd Wanapum Dams, in accordance with Public Law 544, 83d 
'ongress. Project constructed by Grant County Public Utility 
)istrict. 
1172

SEATTLE, WASH., DISTRICT 
TABLE 38-K COMPLETED FLOOD PLAIN STUDIES 
(See Section 32 of Text) 
Date Fe 
Location Requesting Agency Completed Co 
Montana: 
Columbia Falls-Kalispell, Clark Fork State of Montana; Water Resource Board September 1969 $31, 
Missoula, Clark Fork State of Montana; Water Resource Board January 1968 5, 
Washington: 
Benton County, Yakima River State of Washington; Department of April 1968 31, 
Water Resources1 
Bucoda, Skookumchuck River State of Washington; Department of March 1968 20, 
Water Resources 1 
Centralia-Chehalis, Chehalis River State of Washington; Department of July 1968 25, 
Water Resources 1 
Nooksack and Sumas Rivers State of Washington; Department of June 1967 47, 
Water Resources 1 
Renton, Cedar River State of Washington; Department of March 1969 37, 
Water Resources 1 
Skagit River State of Washington; Department of April 1967 41, 
Water Resourcesi 
Snohomish River State of Washington; Department of June 1967 79, 
Water Resources1 
Stillaguamish River State of Washington; Department of November 1963 30, 
Water Resources1 
Yakima-Union Gap, Yakima and Naches Rivers State of Washington; Department of May 1970 59, 
Water Resources 1 
1. Renamed "Department of Ecology." 
1173

WALLA WALLA, WASH., DISTRICT * 
This district comprises southeastern Wash., exclusive 
of watershed of Columbia River and tributaries above 
and including Yakima River, Wash.; all of Idaho 
except northern part and a small southeastern portion; 
a portion of western Wyoming; a small part 
northeastern Utah; part of northeastern Nevada; and 
part of eastern Oregon. 
IMPROVEMENTS 
Navigation Page 
1. Other Authorized Navigation Projects .. 1175 
Flood Control 
2. Bear Creek, Kendrick, Idaho .............. 1175 
3. Blackfoot Reservoir, Idaho ................... 1176 
4. Catherine Creek Lake, Oreg. ................. 1176 
5. Columbia River Basin, Local Flood 
Protection Project ..... ...................... 1177 
6. Cottonwood Creek Dam, Idaho ............ 1177 
7. John Day River, Oreg., Columbia 
River Basin, Local Flood Protection 
Project. ....................................... ... 1177 
8. Lapwai Creek, Culdesac, Idaho ............ 1178 
9. Lucky Peak Lake, Idaho ....................... 1178 
10. Lyman Creek, Idaho .......................... 1178 
11. Mill Creek Lake, Wash .................... 1178 
12. Portneuf River, Lava Hot Springs, 
Idaho ......................................... ... 1178 
13. Ririe Lake, Idaho .................................. 1179 
14. Stuart Gulch Dam, Idaho ................... 1179 
15. Tucannon River, Camp Wooten, Wash. 1179 
16. Inspection of Completed Flood Control 
Projects ........................................ 1180 
17. Scheduling Flood Control Reservoir 
Operations ..................................... 1180 
NAVIGATION 
1. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 39-B.
FLOOD CONTROL 
2. BEAR CREEK, KENDRICK, IDAHO 
Location. On left bank of Bear Creek immediately 
upstream from its confluence with Potlatch River in 
west central section of Idaho near village of Kendrick. 
Existing project. Plan of improvement provides for 
construction of a revetted levee approximately 1,200 
* All cost and financial statements for projects are listed at the 
appear at the end of this chapter. 
Flood Control (cont.) Pag 
18. Other Authorized Flood Control 
Projects ...................................... 118 
19. Flood Control Work Under Special 
Authorization ................................ 
Multiple-Purpose Projects Including Power 
20. Dworshak Dam and Reservoir, Idaho .. 118 
21. Ice Harbor Lock and Dam, Wash. 
(Lake Sacajawea) .................................. 118 
22. John Day Lock and Dam, Oreg. & 
Wash. (Lake Umatilla) .................... 118 
23. Little Goose Lock and Dam, Wash. 
(Lake Bryan) ........................................ 118 
24. Lower Granite Lock and Dam, Wash. 118 
25. Lower Monumental Lock and Dam, 
Wash. ........................................ 118 
26. McNary Lock and Dam, Oreg. & 
Wash. (Lake Wallula) ...................... 118 
27. Snake River Downstream from Johnson 
Bar Landing, Oreg., Wash., & Idaho 118 '28. Other Authorized Multiple-Purpose 
Projects ............................................ 118 
General Investigations 
29. 
30. 
31. 
Surveys ............................................. 
Collection and Study of Basic Data ..... 
Research and Development ................... 
118 
118 
118 
feet long, and channel renovation. Protection provide 
against a flood of 8,800 cubic feet per second which ha 
an estimated exceedence interval of about once in 20( 
years. Project was adopted by Chief of Engineer 
March 11, 1968 under authority of section 205, 1941 
Flood Control Act, as amended. Costs of complete< 
project were $133,518, Federal, and $1,750 non-Fed 
eral for rights-of-way. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Work under 
contract for channel improvement was accomplished. 
end of this chapter. All other tables are referenced in text and als 
1175

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Condition at end of fiscal year. Construction started in 
September 1969 and was completed in October 1969. 
3. BLACKFOOT RESERVOIR, IDAHO 
Location. On Blackfoot River in Caribou County, 
Idaho, about 40 miles southeast of city of Blackfoot. 
(See Geological Survey quadrangle sheets Paradise 
Valley, Cranes Flat, Portneuf, and Henry Fork 
location and surroundings in immediate vicinity of 
project). 
Existing project. Blackfoot Reservoir is owned and 
operated by Fort Hall Agency of Bureau of Indian 
Affairs, Department of Interior. Main dam which is 52 
feet high, is a rockfill structure with a concrete core. 
China Hat Dam, an earthfill structure, closes an arm of 
reservoir near its upstream end to minimize storage loss 
due to seepage in pervious formation of that area. 
Existing main dam structure includes a 3,800-cubicfoot-
per-second spillway on the right abutment and an 
outlet tunnel in left abutment with a capacity of 2,700 
cubic feet per second. Reservoir has a usable storage 
capacity of 413,000 acre-feet at design maximum water 
surface elevation 6124. However, due to experience 
with seepage losses from southern end of reservoir, 
operating level has been limited to about elevation 
6120, or about 340,000 acre-feet storage capacity. 
Water stored in reservoir is used to irrigate lands in 
Fort Hall Indian Reservation in vicinity of Blackfoot 
and south. Recommended modifications of the project 
would provide 38,000 acre-feet additional storage 
capacity for flood control. Modifications would permit 
operation of reservoir for flood control to a maximum 
water surface elevation of 6126. The spillway capacity 
would be increased to 15,800 cubic feet per second by 
lowering crest elevation from 6118.5 to 6111.7 and 
increasing spillway width from 52 feet to 93 feet. 
Spillway would be equipped with new gates. Outlet 
works would be modernized and rehabilitated for flood 
control operation. China Hat Dam would be raised 8 
feet and Idaho State Highway No. 34 would be raised 
in grade for approximately 1/2 mile along with grade 
raising of two existing bridges. Recommended modification 
was authorized by Flood Control Act of 1962. 
Construction to be accomplished by the Corps, with 
continued operation of project by Bureau of Indian 
Affairs. Estimated Federal cost of proposed modifications 
(July 1970) is $2,790,000. 
Local cooperation. None required. 
Operations and results during fiscal year. Preconstruction 
planning continued throughout fiscal year. 
Condition at end of fiscal year. Modification of Blackfoot 
Reservoir project in interest of increased flood control 
for Blackfoot River Basin was first presented as a 
potential project in review report for Upper Snake 
River Basin dated 1961, which was prepared jointly by 
Walla Walla District and Regional Office of Bureau of 
Reclamation in Boise, Idaho. That review report was 
authorized by a Senate Resolution adopted March 19, 
1954, which requested a review of House Doc. 531, 81st 
Congress, 2nd session, with particular reference to 
Upper Snake River Basin above Weiser, Idaho. In 
referenced review report, modification of Blackfoot 
Reservoir project was presented as one of the potential 
projects warranting early consideration for construction. 
Interim report on modification of Blackfoot 
Reservoir, dated March 1962, included additional 
information and analysis of February 1962 floods and 
confirmed project economic feasibility. It is on this 
latter report that congressional authorization is based. 
Hydrology and general design memoranda have 
been approved. Action is pending on approval of real 
estate design memorandum and a supplement which 
have been submitted. Preparation of a feature design 
memorandum is in progress and is scheduled for 
publication in October 1970. 
4. CATHERINE CREEK LAKE, OREG. 
Location. On Catherine Creek about 8 miles above 
Union, Oregon, in Section 7, Township 5 South, Range 
41 East, Willamette Meridian. 
Existing project. Dam will be an earth embankment 
with an impervious core protected by sand and gravel 
filters. Shell material will consist of granular fill 
covered with substantial zones of rockfill on outside 
surfaces. Upstream face will be protected by riprap. 
Effective height will be about 197 feet and crest length 
790 feet. A spillway will be in a saddle in left abutment 
about 1,000 feet from dam. Spillway will have three 15- 
by 18.5-foot tainter gates having a capacity of 11,740 
cfs. Lake will contain 61,000 acre-feet of water with 58, 
000 acre-feet of usable space at elevation 3440. 
Improvement will provide for flood control, irrigation, 
municipal and industrial water supply, water quality 
control, fish and wildlife, recreation, and downstream 
hydroelectric power. Project was authorized by 1965 
Flood Control Act. Estimated Federal cost (July 1970) 
is $11,500,000. 
Local cooperation. The Water Supply Act of 1958 as 
amended applies. The city of Union, Oregon, by letter 
dated September 27, 1961, has provided assurances of 
willingness and ability to meet requirements. Reimbursable 
costs are presently estimated to be $349,000 
for construction and $1,000 annually for operation, 
maintenance, and replacement. 
The Federal Water Project Recreation Act of 1965 
applies. This requirement for loca 1 cooperation was 
added after submittal of the Survey Report. Negotiations 
are now underway to obtain a letter of 
assurance from a responsible non-Federal public body. 
Reimbursable costs are estimated to be $355,000 for 
construction and $47,600 annually for operation, 
maintenance, and replacement. 
In accordance with reclamation law, local irrigation 
interests will be required to repay portion of first costs 
and annual operation, maintenance, and replacement 
costs of dam and reservoir allocated to the irrigation 
function, currently estimated at $1,561,000 and $12, 
300, respectively. Portion of construction cost beyond 
ability of irrigators to repay will be returned to 
reclamation fund from revenues derived from dis- 
1176

WALLA WALLA, WASH., DISTRICT 
position of power marketed through the Bonneville 
Power Administration. Irrigation districts are to 
contract for repayment of cost allocated to irrigation. 
Operations and results during fiscal year. Preparation of a 
hydrology design memorandum and a general design 
memorandum progressed. Flood regulation studies and 
scoping studies continued in coordination with the 
Bureau of Reclamation, Federal Water Quality 
Administration, and other agencies. Mapping was 
completed and foundation explorations were continued. 
Condition at end of fiscal year. Preconstruction planning 
is approximately 55 percent complete. 
5. COLUMBIA RIVER BASIN, LOCAL 
FLOOD PROTECTION PROJECTS 
Location. Improvements included in this project are 
along Columbia River and its tributaries. 
Existing project. Flood Control Act of 1950 approved a 
general comprehensive plan for Columbia River Basin 
for flood control and other purposes (H. Doc. 531, 81st 
Cong., 2d sess.) and authorized $75 million to be 
appropriated for partial accomplishment of certain 
projects. Of this authorization, not to exceed $15 
million was authorized for construction of local flood 
protection works throughout Columbia River Basin, 
subject to conditions that all work undertaken pursuant 
to this authority shall be economically justified 
prior to construction, and local cooperation specified in 
1936 Flood Control Act, as amended, shall be required. 
(See table 39-C for local flood projects in Walla Walla 
District.) (Note: This table does not include improvements 
in Portland and Seattle districts.) 
Local cooperation. Section 3 of the Flood Control Act 
approved June 22, 1936, as amended, applies to all the 
flood control projects. 
Operations and results during fiscal year. Costs were 
incurred only on John Day River area, Oregon, a fully 
authorized project which is reported in detail in an 
individual report. 
Condition at end of fiscal year. John Day River area, 
Oregon, is reported in detail in an individual project 
report. Boise Valley, Idaho (Ada County Unit) is the 
only other Columbia River Local Protection Project in 
a "work-in-progress" status. However, activity on this 
unit is suspended due to inability of sponsor to obtain 
rights-of-way. 
6. COTTONWOOD CREEK DAM, IDAHO 
Location. On Cottonwood Creek at east city limits of 
Boise in Ada County, Idaho, in Section 2, Township 3 
North, Range 2 East, Boise Meridian. 
Existing project. Plan of improvement provides for an 
earthfill dam with central impervious core, protected 
filter zone downstream from core and outer zones of 
random fill. A horizontal drainage blanket downstream 
from impervious core and a gravel blanket two 
feet thick will be used for protection of faces against 
erosion. Dam will be 96 feet high, 24 feet wide at top 
and 480 feet long at crest. Storage capacity will be 1050 
acre-feet at spillway crest elevation with a surface area 
of 43 acres. A spillway in left abutment will have a 
capacity of 33,500 cubic feet per second and will be 100 
feet wide with concrete sill and 100-foot wide rock 
channel. Outlet works with capacity of 250 cubic feet 
per second will consist of an ungated concrete conduit 
39 inches in diameter, with trashrack intake and 
impact stilling basin. Project provides flood control for 
city of Boise, Idaho. 
Project was authorized under Flood Control Act of 
1966, H.D. 486, 89th Congress. Estimated Federal cost 
(July 1970) is $2,600,000. Estimated non-Federal cost 
of lands, damages, and relocations is $502,000. 
Local cooperation. Local interests are required to 
provide lands, easements, and rights-of-way and all 
relocations required for the project; hold and save the 
United States free from damages incident to construction; 
and to operate and maintain project upon 
completion. Rights-of-way have been acquired. 
Operations and results during fiscal year. A hydrology 
design memorandum and a general design memorandum 
were completed and submitted to NPD. 
Condition at end of fiscal year. A hydrology design 
memorandum and a general design memorandum 
have been prepared and await approval. No construction 
has been done. 
7. JOHN DAY RIVER, OREG., 
COLUMBIA RIVER BASIN, LOCAL 
FLOOD PROTECTION PROJECT 
Location. Along the John Day River and Canyon 
Creek (4.7 miles), in the vicinity of John Day, Oregon 
(River Mile 242), and along the John Day River (1.9 
miles) in the vicinity of Mount Vernon, Oregon (River 
Mile 234). 
Existing Project. The plan of improvement provides for 
channel improvement and intermittent levees along 
John Day River and Canyon Creek in the vicinity of 
John Day and Mount Vernon, Oregon for a distance of 
6.6 miles. Downstream limits of the project in the 
Mount Vernon area are at river mile 233 and the 
upstream limits in the John Day area are at river mile 
243. Project was conditionally authorized under 
Columbia River Basin plan by section 204, Flood 
Control Act of 1950, subject to economic justification, 
which was established in 1962. Estimated Federal cost 
(July 1969) is $792,000. Estimated non-Federal cost 
(July 1969) is $203,000 for rights-of-way, irrigation 
facilities, bridge alterations and relocations. These 
amounts apply only to aforementioned locations 
determined to be economically feasible. 
Local Cooperation. Section 3, Flood Control Act of June 
22, 1936, as amended, applies. Assurance resolutions 
from Grant County and John Day city officials have 
been accepted. On request, Grant County was granted 
an extension of time to acquire rights-of-way for the 
project. 
Operations and results during fiscal year. Preparation of 
plans and specifications was suspended pending 
acquisition of rights-of-way by sponsor. 
Condition at end of fiscal year. Plans and specifications 
are estimated to be 65 percent complete. Start of 
1177

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
construction is being delayed to permit compliance 
with local cooperation requirements. 
8. LAPWAI CREEK, CULDESAC, IDAHO 
Location. On Lapwai Creek through village of 
Culdesac, Idaho, 20 miles east of Lewiston, Idaho. 
Existing project. Plan of improvement provides for 
minor channel reshaping and riprap placement along 
left bank levee, with all bridge abutments to be 
riprapped on both banks. Proposed work covers a reach 
of approximately 3,200 feet. Project was adopted by 
Chief of Engineers April 18, 1969 under authority of 
section 205 of 1948 Flood Control Act, as amended. 
Estimated costs (1968), excluding $19,800 for cost of 
Reconnaissance and Detailed Project Reports, are 
$105,500 Federal and $3,350 non-Federal for rights-ofway, 
removal of structures, and relocation of utilities. 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, as amended, applies. A letter of intent to meet 
requirements of local cooperation has been received 
from Board of Trustees for village of Culdesac. 
Operations and results during fiscal year. Preparation of 
plans and specifications was continued. 
Condition at end of fiscal year. Plans and specifications 
are 85 percent complete. Explorations to find an 
adequate quarry site are underway. No construction 
has been done. 
9. LUCKY PEAK LAKE, IDAHO 
Location. On Boise River in southwestern Idaho about 
10 miles southeast of city of Boise, and about 12 miles 
downstream from Arrowrock Reservoir. 
Existing project. A rolled-earthfill dam about 250 feet 
high and 1,700 feet long at crest, with a lake providing 
a total storage at normal pool level of 306,000 acre-feet. 
For further details see page 2000 of Annual Report for 
1962. Project was authorized by 1946 Flood Control 
Act. Federal cost of completed project was $19,081,250. 
Construction of additional recreation facilities for 
completed project is estimated to cost $506,000 (July 
1970), raising total project estimate to $19,587,250. 
Local cooperation. None required. 
Operations and results during fiscal year. Operation and 
maintenance: Normal operation for flood control and 
irrigation continued. A contract for $3,500 was 
awarded and completed for painting miscellaneous 
metal in the intake tower. Lake water quality studies 
continued. 
Condition at end of fiscal year. Construction of existing 
project was initiated in November 1949 and completed 
in June 1961. Improvement and enlargement of 
recreation facilities by Federal agencies and local 
interests continue. 
10. LYMAN CREEK, IDAHO 
Location. New channel starting from a point where 
Union Pacific Railroad crosses Lyman Creek and 
extending southwest to Snake River north of Ririe. The 
general area lies approximately 9.5 miles south of 
Rexburg. 
Existing project. Plan provides for about 4,500 feet of 
new channel construction with levees along both banks 
and riprap protection at sharp turns. Proposed channel 
is designed for a flood of 1,500 cubic feet per second. 
Project was adopted by Chief of Engineers May 1967, 
under authority of section 205, 1948 Flood Control Act, 
as amended. Estimated Federal cost (July 1970), 
excluding $22,600 for Reconnaissance and Detailed 
Project Reports, is $218,000. Non-Federal cost is 
estimated to be $21,900 for right-of-way, bridge 
replacement, and relocations. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. A construction 
contract was awarded. 
Condition at end of fiscal year. Preconstruction planning 
is complete and construction is scheduled to begin early 
in fiscal year 1971. 
11. MILL CREEK LAKE, WASH. 
Location. In and upstream from Walla Walla, 
Washington, on Mill Creek, a tributary of Walla Walla 
River. 
Existing project. Off-stream storage dam, outlet works, 
diversion works, and diversion structure were authorized 
by 1938 Flood Control Act. Channel through 
city of Walla Walla was added to project by 1941 Flood 
Control Act (H. Doc. 719, 76th Cong., 3d sess.). For 
further details see page 2005 of Annual Report for 
1962. Completed project cost $2,162,155. Recreation 
facilities for completed project cost $68,446 (Corps 
funds), raising total project cost to $2,230,601. 
Local cooperation. Fully complied with. Ordinary 
operations and maintenance by local interests for 
calendar year 1969 were performed at a cost of $184, 
122. Total expenditures to date by local interests are 
$843,127. For further details see page 2006 of Annual 
Report for 1962. 
Operations and results during fiscal year. Ordinary 
general maintenance by Government forces continued, 
which included routine regulation of lake and care of 
recreation area. 
Condition at end of fiscal year. Construction of dam and 
appurtenant works was completed in 1942. Paving 
channel through city of Walla Walla was completed in 
1948. Park and recreation facilities were opened to 
public July 1, 1964. For dates of minor improvements, 
relocations, and extraordinary maintenance see page 
2006 of Annual Report for 1962. 
12. PORTNEUF RIVER, LAVA HOT 
SPRINGS, IDAHO 
Location. On Portneuf River, through village of Lava 
Hot Springs approximately 30 miles south of Pocatello, 
Idaho. 
Existing project. Plan of improvement provides for an 
enlarged concrete channel and levee through the 
village of Lava Hot Springs for a distance of 3,000 feet. 
Project was adopted by Chief of Engineers in August 
1968 under authority of section 205 of the 1948 Flood 
Control Act, as amended. Estimated cost (July 1969) 
excluding $39,000 for cost of Reconnaissance and 
Detailed Project Reports, is $747,000 Federal, and $13, 
800 non-Federal for rights-of-way and relocations. 
1178

WALLA WALLA, WASH., DISTRICT 
Local cooperation. Section 3, Flood Control Act of June 
22, 1936, as amended, applies. A letter of intent to meet 
requirements of local cooperation has been received 
from Lava Hot Springs officials. 
Operations and results during fiscalyear. Field surveys and 
preliminary explorations were completed. Preparation 
of plans and specifications was continued. 
Condition at end of fiscal year. Preparation of plans and 
specifications is 30 percent complete. No construction 
has been done. 
13. RIRIE LAKE, IDAHO 
Location. On Willow Creek, a tributary of Snake 
River, in Bonneville County, Idaho. Proposed channel 
improvement extends from junction of Sand and 
Willow Creeks to a point on Snake River about 4 miles 
upstream from city of Idaho Falls, Idaho. (See 
Geological Survey quadrangle map, Ucon, Idaho.) 
Damsite is about 5 miles below confluence of Willow 
Creek and Meadow Creek and about 15 miles northeast 
of city of Idaho Falls, Idaho. (See Geological Survey 
quadrangle map, Poplar, Idaho.) 
Existing project. Provides for a rockfill dam (about 840 
feet long at the crest and 184 feet high above 
foundation) and downstream channel construction. 
Spillway will have a concrete-lined channel in right 
abutment. Outlet works will utilize a reinforced 
concrete conduit leading from an intake tower upstream 
to a stilling basin downstream at the toe of left 
abutment. Lake will have gross capacity of 100,000 
acre-feet; 90,000 acre-feet of active storage for flood 
control, irrigation and recreation; and 10,000 acre-feet 
dead storage for sediment storage and conservation. 
Floodway channel will be about 7.5 miles long and 
have a capacity of 900 cubic feet per second. Existing 
project was authorized by 1962 Flood Control Act (H. 
Doc. 562, 87th Cong., 2d sess.). Estimated Federal cost 
of new work (July 1970) is $17,400,000 Corps of 
Engineers funds, and $30,000 for value of publicowned 
lands. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Preparation of a 
design memorandum for a flood channel continued. A 
contract for first portion of main dam and a highway 
access road was awarded for $1,908,640. 
Condition at end offiscalyear. Approximately 60 percent 
of necessary real estate has been acquired. Main dam 
construction is underway. Plans and specifications are 
being prepared for second portion of main dam 
construction. A design memorandum for a flood 
channel, and a lake master plan are in progress. 
Construction was started in June 1967 and entire 
project is about 17 percent complete. 
14. STUART GULCH DAM, IDAHO 
Location. On Stuart Gulch, near and north of Boise, 
Ada County, Idaho, in Sections 21 and 28, Township 4 
North, Range 2 East, Boise Meridian. 
Existing project. Dam will be earth embankment with 
central filter zone and a downstream drainage blanket 
Random fill portions of embankment consist of sand 
and silty sands. Upstream and downstream faces an 
adjacent abutment slopes will be protected agains 
erosion by gravel blanket two feet thick. Dam will be 5 
feet high and 1,050 feet long at crest. At spillway crest 
reservoir will have surface area of 39 acres and storage 
capacity of 500 acre-feet. An ungated spillway in left 
abutment with a capacity of 18,700 cubic feet per 
second has a 150-foot wide channel and concrete-line 
chute. An ungated 100-cubic-foot-per-second outle 
works under embankment with 30-inch diamete 
concrete conduit is provided. Project will provide flood 
control for city of Boise, Idaho. 
Project was authorized under Flood Control Act o 
1966 (H. Doc. 486, 89th Cong., 2d sess.). Estimate 
Federal cost (July 1970) is $1,790,000. Estimated non- 
Federal cost for land is $219,000. 
Local cooperation. Local interests are required t 
provide lands, easements, rights-of-way, and relocations 
required for the project; hold and save the 
United States free from damages incident to construction; 
and to operate and maintain the project 
upon completion. 
Operations and results during fiscal year. Preparation of 
hydrology design memorandum was completed and 
work continued on a general design memorandum. 
Condition at end of fiscal year. Hydrology design 
memorandum is complete and general design memorandum 
is 91 percent complete. 
15. TUCANNON RIVER, CAMP WOOTEN, 
WASH. 
Location. On upper Tucannon River within Camp 
Wooten recreational area. Camp is located approximately 
21 miles upstream from Marengo, Washington, 
in Columbia County. 
Existing project. Provides for channel renovation and 
1,900 feet of levee construction, of which 900 feet is 
revetted. Improvements are designed to protect the 
camp from flows up to 4,500 cubic feet per second. 
Project was adopted by Chief of Engineers January 5, 
1968 under section 205, 1948 Flood Control Act, as 
amended. Estimated Federal cost (July 1970) excluding 
$8,000 for Reconnaissance and Detailed 
Project Reports, is $48,500. Non-Federal cost is 
estimated to be $500 for right-of-way. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Plans and 
specifications were completed. Invitations for construction 
bids were issued. 
Condition at end offiscalyear. Preconstruction planning 
is complete. Construction bid openings are scheduled 
forJuly 1970. 
1179

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
16. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Federal law requires local interests to maintain and 
operate completed local protection projects in accordance 
with regulations prescribed by Secretary of 
Army. Inspections were made to determine extent of 
compliance and to advise local interests as necessary of 
measures required to correct deficiencies. (See table 39- 
D for inspections made during fiscal year.) 
Fiscal year costs were $13,705. Total costs to June 30, 
1970 were $119,987. 
17. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Coordination of functional regulation of non-Corps 
reservoirs and associated studies was accomplished 
under several authorities. Regulati on of Palisades, 
Little Wood, and Anderson Ranch Reservoirs was 
coordinated under section 7, Flood Control Act of 
1944. Formal agreements in connection with operation 
of reservoirs provided authority for functional coordination 
of Jackson Lake, Arrowrock Reservoir, and 
Lake Lowell for flood control. Regulation of American 
Falls, Owyhee, Magic, Mackay, Cascade, and Deadwood 
Reservoirs for flood control was coordinated 
under informal arrangements. Provisions of Federal 
Power Commission's license to Idaho Power Company 
were the basis for coordinating functional regulation of 
Brownlee, Oxbow and Hells Canyon Reservoirs. 
A preliminary Report on Review of Effects on 
Navigation and Flood Control of Idaho Power Company 
Projects in Hells Canyon Reach of Snake River 
was prepared in response to a petition by navigation 
interests for change of license. In coordination with the 
Bureau of Reclamation a formal plan of operation 
under section 7, Flood Control Act of 1944, and a 
preliminary report on reservoir regulations for Bully 
Creek, Warm Springs, and Agency Valley Reservoirs 
in Malheur River Basin were revised and resubmitted 
to higher authority. Discussions were begun with the 
Bureau of Reclamation on the disparity in criteria for 
spillway design floods developed by the two agencies. 
The discussions result from questioning the spillway 
adequacy at Mason Dam on Powder River, Oregon. 
Fiscal year costs were $17,961. 
18. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 39-E. 
19. FLOOD CONTROL WORKS UNDER 
SPECIAL AUTHORIZATION 
Flood Control Activities Pursuant to section 205, Public Law 
858, 80th Congress as Amended (Preauthorization) 
See table 39-F for flood control work under special 
authorization. 
Emergency Flood Control Activities - Repair and Flood 
Fighting and Rescue Work (Public Law 99, 84th Cong., and 
Antecedent Legislation) 
Federal cost for fiscal year was $24,694 for advance 
preparation; $143,890 for flood emergency operations; 
and $107,469 for repair and restoration. 
Snagging and Clearing Navigable Streams and Tributaries 
in Interest of Flood Control (sec. 208, 1954 Flood Control Act, 
Public Law 780, 83d Cong.) 
(See table 39-G for flood control work under special 
authorization.) 
MULTIPLE-PURPOSE PROJECTS 
INCLUDING POWER 
20. DWORSHAK DAM AND RESERVOIR, 
IDAHO 
Location. Damsite is on North Fork Clearwater River 
1.9 miles above its junction with Clearwater River, 
near Orofino, Idaho, and about 35 miles east of 
Lewiston, Idaho. 
Existing project. Project as authorized will provide a 
straight concrete-gravity dam 6300 feet in effective 
height at pool elevation 1,600 and 3,300 feet long at 
crest elevation 1613. Dam will create a reservoir with a 
gross storage capacity of 3,468,000 acre-feet, of which 
2,016,000 acre-feet will be effective for both local and 
regional flood control, and for at-site and downstream 
power generation. In addition, reservoir pool, extending 
53 miles into a rugged and relatively inaccessible 
timberland, will provide important transportation 
savings in connection with movements of 
marketable logs and will also afford substantial 
recreational benefits. Powerhouse will provide two 90, 
000 and one 220,000 kilowatt generating units initially, 
with provisions for three additional 220,000 kilowatt 
units for an ultimate installed capacity of 1,060,000 
kilowatts. Principal data concerning spillway dam, 
powerplant, and impoundment are set forth in table 
39-H under this subject at end of chapter. 
No significant runs of salmon occur in North Fork 
Clearwater River; however, considerable migrations of 
steelhead trout are recorded at Washington Water 
Power Co. dam at Lewiston, Idaho, near mouth of 
Clearwater River. Fish passage is not feasible so a 
hatchery has been provided to assure continuance of 
fish runs. Dworshak Reservoir is habitat for elk, deer, 
and other wildlife. Project plans include acquisition of 
land outside reservoir limits to mitigate losses of winter 
browse areas inundated by reservoir. 
Planning was authorized by 1958 Flood Control Act 
in accordance with plan presented in Senate Doc. 51, 
84th Cong., Ist sess. Project authorized for construction 
by Public Law 87-874. Initial appropriation for 
construction was by Public Works Appropriation Act 
of 1962. Estimated total cost for new work (July 1970) 
is $283,740,000, consisting of $281,000,000 Corps 
1180

WALLA WALLA, WASH., DISTRICT 
funds, and $2,740,000 for value of public-domain 
lands. 
Local cooperation. None required. 
Operations and results during fiscal year. Main contract 
for construction of dam and other features continued. 
Added to this contract was a $6 million multi-level 
power intake structure on upstream face of dam so that 
natural river water temperatures downstream can be 
duplicated to assure continuance of existing fish runs. 
Work was completed under contracts for construction 
of steelhead fish hatchery facilities and for 
Dent Bridge approach roads. Contracts were awarded 
for construction of Dent Bridge, and for construction of 
powerhouse. Several powerhouse supply contracts were 
awarded. Area schools, impacted by students from the 
project, continued to receive Federal aid under P.L. 90- 
483. 
Condition at end offiscalyear. Reservoir Master Plan has 
been submitted. Preparation of specific design memoranda 
is in progress for buildings and grounds at 
damsite and for development of recreational sites. 
Invitations for bids for construction of Grandad Creek 
Bridge were issued late in fiscal year 1970. All project 
land has been acquired except that required to replace 
the loss of wildlife browse areas from inundation by 
reservoir. All reservoir area marketable timber owned 
by the Government has been sold. Relocations are 
estimated to be 19 percent complete; dam, 58 percent 
complete; fish and wildlife facilities, 41 percent 
complete; and powerplant, 9 percent complete. Construction 
of the project started in April 1963, and 
project is estimated to be 51 percent complete. 
21. ICE HARBOR LOCK AND DAM, 
WASH. (LAKE SACAJAWEA) 
Location. On Snake River, 9.7 miles above river 
mouth, at head of McNary Lock and Dam pool, and 12 
miles east of Pasco, Wash. 
Existing Project. A dam, powerplant, navigation lock, 
fish ladders, appurtentant facilities, and relocation of 
railroads. Improvement provides for navigation, hydroelectric 
power generation and incidental irrigation. 
Dam is designed for a normal pool at elevation 440 
mean sea level. Normal pool extends upstream about 
31.9 miles, providing slackwater to Lower Monumental 
Lock and Dam site. Structure is about 2,700 
feet long. Beginning at south end, project consists of a 
concrete non-overflow section, a concrete powerhouse, 
a spillway dam, a concrete non-overflow section, a 
navigation lock, and an earth and rock filled embankment 
at north abutment. Fish passing facilities, 
including two ladders, are provided. Powerplant has an 
initial installation of three 90,000 kilowatt units, with 
provision for three additional units, an ultimate total of 
six units. Spillway dam is 610 feet long, and overflow 
crest at elevation 391 mean sea level is surmounted by 
10 radial gates, 50 feet wide by 52.9 feet high which 
provide capacity to pass a spillway design flood of 850, 
451-584 0-72-75 
000 cubic feet per second. Deck is at elevation 453 
mean sea level and provides a service road and track 
for a gantry crane. Navigation lock is a single-lift type 
and has clear plan dimensions of 86 by 675 feet. A 
navigation channel 250 feet wide and minimum depth 
of 15 feet is provided from mouth of Snake River to 
dam. Principal data concerning navigation lock, 
spillway dam, powerplant, and impoundment are set 
forth in table 39-H under this subject at end of chapter. 
Existing project was authorized by 1945 River and 
Harbor Act (P.L. 14, 79th Cong., 1st sess.). Estimated 
total cost for new work (July 1970) is $157,891,800, 
consisting of $157,700,000 Corps of Engineers funds, 
$87,000 for Coast Guard navigation aids, $22,300 
Federal funds for value of public-domain lands, and 
$82,500 non-Federal funds contributed for artificial 
spawning channel. Construction of additional recreational 
facilities for completed project is estimated to 
cost $2,800,000 Corps of Engineers funds, raising total 
project cost to $160,691,800. 
Local Cooperation. None required. 
Operations and results during fiscal year. New Work: 
Deferred construction was continued on Union Pacific 
Railroad. Preconstruction planning for additional 
generating units was continued. 
Code 710 Activity: Planning for dev elopment of 
recreation facilities at Charbonneau Park and Levey 
Landing progressed. 
Operation and Maintenance: Normal operation and 
maintenance of navigation lock and powerplant 
continued, and 1,983,142 megawatt hours of electrical 
energy were delivered to Bonneville Power Administration, 
the marketing agency. A total of 282,389 
tons of commodities were passed through navigation 
lock. A $62,000 contract was awarded for resurfacing 
project roads. 
Condition at end of fiscal year. Initial development is 
complete. Project was placed on a permanent operating 
basis January 1962, and lake was raised to 
normal elevation 440 April 1962. Navigation lock was 
opened to normal traffic in October 1962. Land 
acquisition is complete. Basic recreation facilities 
constructed with regular project funds are essentially 
complete. Construction started in December 1955 and 
initial project is over 99 percent complete. Preliminary 
design of 3 additional generating units has been 
accomplished. 
22. JOHN DAY LOCK AND DAM, OREG. 
& WASH. (LAKE UMATILLA) 
Location. Site is on Columbia River, about 3 miles 
downstream from mouth of John Day River and about 
215 miles above mouth of Columbia River. 
Existing project. A dam, powerplant, navigation lock, 
fish ladder, and appurtenant facilities with a slackwater 
pool about 75 miles long extending to McNary 
Lock and Dam. Included is relocation of railroads, 
highways, utilities, and communities affected by the 
81

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
impoundment. The project as originally authorized 
would have provided 2,000,000 acre-feet of flood 
control storage. As modified the project provides 500, 
000 acre-feet of flood control storage between minimum 
pool elevation of 257 and a maximum elevation 
of 268. Powerhouse provides for 20 generating units of 
135,000 kilowatts each. Initial installation consists of 16 
units for a total of 2,160,000 kilowatts. Principal data 
concerning navigation lock, spillway dam, powerplant, 
and impoundment are set forth in table 39-H under 
this subject at end of chapter. 
A detailed description of project as authorized and 
modified is on pages 1992 and 1993 of Annual Report 
for 1962. Estimated Federal cost of new work (July 
1970) is $468,507,000, consisting of $469,000,000 Corps 
of Engineers funds, $333,000 for Coast Guard navigation 
aids, and a net reduction of $826,000 for value 
of public-owned land and other property transferred to 
and from the project without reimbursement. 
Local cooperation. None required. 
Operations and results during fiscalyear. New Work: Four 
units of 135,000 kilowatts each were put into service 
during the fiscal year. Contractor completed remaining 
concrete work. Turbine parts for Unit 16 were placed. 
Turbine rotating parts were placed in Units 13 through 
16. Progress in getting generating units into service has 
been delayed because of General Electric Co. strike. 
The navigation channel downstream from navigation 
lock was dredged to assure a minimum depth of 15 feet. 
Except for remaining paving on Oregon State Highway 
80N and deferred construction, nearly all relocations 
are completed. 
Construction contracts were awarded for modification 
of a breakwater at Arlington, Oregon, $621, 
900; pre-stressing spillway gate anchorages, Pier 10, 
$40,000; and sewage disposal system modification, $51, 
600. Major supply contracts awarded consisted of 15 
KV bus and breaker equipment, $420,900; generators 
15 and 16, $4,049,000; and spillway stoplogs, $131,800. 
Design studies were nearly completed for recreation 
facilities scheduled to be advertised in early FY 1971. 
Operation and Maintenance: Activities during fiscal 
year 1970, utilizing O&M funds, increased as additional 
generating units went into service, additional 
units being as follows: Unit No. 9, 2 Jul 1969; Unit No. 
10, 26 Aug 1969; Unit No. 11, 4 Feb 1970; and Unit 
No. 12, 22 Apr 1970. From electrical generation by 
these units in conjunction with eight others previously 
placed in service, 9,011,296 megawatt hours of electric 
energy were delivered to Bonneville Power Administration, 
the marketing agency. Cargoes through 
navigation lock amounted to 2,090,232 tons. 
Condition at end offiscalyear. Twelve generating units of 
135,000 kilowatts each are producing a total output of 
1,620,000 kilowatts. Work continues on the installation 
of turbines, generators and necessary equipment. Dam 
completion contract is complete. Relocations are 
essentially complete except for deferred construction, 
and paving Oregon State Highway. Remaining to 
complete are two hatcheries for mitigation of fish losses 
sustained by inundation of spawning areas in Lake 
Umatilla, recreation facilities, lock guide wall extension, 
City of Arlington breakwater, and modification 
of sewage disposal system. Miscellaneous 
relocations, including towns, schools, cemeteries and 
utilities are estimated to be 95 percent complete. Lock 
and dam are estimated to be 96 percent complete, 
powerhouse 97 percent complete, and fish facilities 57 
percent complete. Entire project is estimated to be 92 
percent complete. 
Note: Due to boundary adjustments, this project is 
now located in the Portland District and henceforth 
will be reported by that District. 
23. LITTLE GOOSE LOCK AND DAM, 
WASH. (LAKE BRYAN) 
Location. Site is 70.3 miles above mouth of Snake 
River, at head of Lower Monumental pool, about 40 
airline miles north of Walla Walla, Wash., and 50 
miles northwest of Lewiston, Idaho. 
Existing project. Provides for a dam, powerplant, 
navigation lock, and appurtenant facilities. Improvements 
provide navigation, hydroelectric power 
generation, recreation, and incidental irrigation. Dam 
is designed for a normal pool at elevation 638 mean sea 
level. Normal pool extends upstream about 37.2 miles 
and provides slack water to Lower non-overflow 
sections. Fish passing facilities include one ladder with 
entrances on both shores with a fish channel through 
spillway which connects to powerhouse fish collection 
system and south shore ladder. Powerhouse is being 
constructed for three 135,000 kilowatt generating units 
to be installed initially, with provisions for three 
additional 135,000 kilowatt units for an ultimate 
installed capacity of 810,000 kilowatts. Spillway dam 
provides capacity to pass a design flood of 850,000 
cubic feet per second. Navigation lock is single lift type 
and has clear plan dimensions of 86 by 675 feet and 
provides a minimum depth of 15 feet over lock sills. 
Relocations along the impoundment include 36 miles 
of Camas Prairie Railroad, 7.2 miles of county roads, 
2.8 miles of state highways, and Central Ferry Bridge. 
Principal data concerning navigation lock, spillway 
dam, powerplant, and impoundment are set forth in 
table 39-H under this subject at end of chapter. 
Existing project was authorized by 1945 River and 
Harbor Act (P.L. 14, 79th Cong., 1st sess.). Estimated 
total cost for new work (July 1969) is $152,090,000, 
consisting of $152,000,000 Corps of Engineers funds, 
$87,000 for Coast Guard navigation aids, and $3,000 
for value of public-owned land. 
Local cooperation. None required. 
Operations and results during fiscal year. The north 
abutment embankment enclosure was made on July 
18, 1970, and the entire flow of the river was passed 
through the three skeleton bays of the powerhouse. 
1182

WALLA WALLA, WASH., DISTRICT 
High water in the Snake River on January 25, 1970 
carried large amounts of debris that plugged the 
trashrack in the three skeleton bays, necessitating 
closing the gates in the three skeleton bays and passing 
the entire flow of the river through the spillway. 
However, on February 16, 1970, as scheduled, the 
spillway gates were closed and the lake was raised to 
elevation 638 feet (maximum pool elevation). 
Initial power on line occurred on March 26, 1970, 
when generator No. 1 was put into service. 
The navigation lock was opened to normal operation 
on May 15, 1970. 
Work continued throughout the fiscal year on 
construction of the powerhouse, eight-bay spillway, 
navigation lock, fish passing facilities, concrete nonoverflow 
dams, and north abutment embankment. 
Work consisted of constructing the north shore embankment; 
painting and adjusting spillway gates, 
navigation lock gates and valves; modified bascule 
bridges; installation of handrails and miscellaneous 
metals; road and parking area paving; and general 
cleanup of area. 
The $2,600,000 powerhouse installation contract 
continued throughout the year with work principally 
on erection of three 135,000 kilowatt hydraulic 
turbines, switchgear, piping, electrical wiring, architectural 
features, and three 850-cubic-foot-per-second 
turbine driven fishway pumps. 
Several contracts consisting of relocations of the 
Camas Prairie Railroad, relocation of Washington 
State Highway No. 127 and Central Ferry Bridge, 
relocation of Whitman and Garfield County roads, and 
relocation of telephone and power facilities were 
completed. 
Various construction contracts were awarded and 
consisted of lake clearing; track removal, Camas 
Prairie Railroad, Central Ferry to Lower Granite; 
relocation of isolated burial sites (Penawawa), Little 
Goose recreation facilities; floating bulkhead; permanent 
operators' quarters; and floating guidewall. 
Design studies are nearing completion on recreation 
facilities, visitors' facilities, and landscaping. 
Operation and Maintenance: Normal operation and 
maintenance were begun on completed facilities that 
were accepted from contractors. A total of 271,413 
megawatt hours of electrical energy was delivered to 
Bonneville Power Administration, the marketing 
agency. Commercial cargoes totaling 335 tons were 
passed through the navigation lock. 
Condition at end of fiscal year. Concrete placing for all 
structures and north abutment embankment is complete. 
The lake has been raised to normal maximum 
elevation of 638 feet. Flow of the river is being passed 
through generating unit No. 1 and over the spillway. 
Approximately 0.2 percent of work remains to complete 
the $71,956,573 main dam contract. Remaining 
work consists principally of installing miscellaneous 
metal, handrails, gratings, stairs, mechanical work, 
and final closure operations. 
The $2,600,000 powerhouse installation contract is 
approximately 90 percent complete. Remaining work 
to be accomplished consists of completing installation 
of rotating parts for two 135,000 kilowatt turbines, 
architectural features and miscellaneous electrical and 
mechanical equipment. 
Relocations of the Camas Prairie Railroad, Washington 
State Highway No. 127, Central Ferry Bridge, 
Whitman and Garfield County roads are complete. 
Remaining items of work for completion of the 
project consist essentially of constructing recreation 
facilities in the lake area, landscaping and visitors' 
facilities at the dam, and construction of permanent 
operators' quarters. 
Power generating unit No. 1 went on line in March 
1970 and the navigation lock was opened to normal 
operation in May 1970. Construction began in June 
1963 and entire project is estimated to be 94 percent 
complete. 
24. LOWER GRANITE LOCK AND DAM, 
WASH. 
Location. Project site is at river mile 107.5 on Snake 
River at head of Little Goose pool, and about 33 miles 
downstream from Lewiston, Idaho. 
Existing project. Provides for a dam, powerplant, 
navigation lock and appurtenant facilities, and requires 
backwater levees near head of pool at Lewiston, 
Idaho and Clarkston, Washington. Benefits afforded 
by project will include slackwater navigation, power 
generation, recreation, and incidental irrigation. Normal 
pool elevation of 738 feet mean sea level extends 
upstream about 36 miles and provides slackwater 
navigation in Lewiston-Clarkston area. Dam structure 
will be about 3,200 feet long. It will consist of a 
powerhouse, spillway dam, navigation lock, necessary 
nonoverflow sections, and fish passing facilities. Powerplant 
will be constructed for three 135,000 kilowatt 
units to be installed initially with provisions for three 
additional similar units. Spillway will provide capacity 
to pass a design flood of 850,000 cubic feet per second. 
Navigation lock will be single lift type (105 feet) and 
have clear plan dimensions of 86 by 675 feet and 
provide a minimum depth of 15 feet over lock sills. 
Backwater levees will be about 10 miles long in 
Lewiston-Clarkston area. Principal data concerning 
navigation lock, spillway dam, powerplant, and 
impoundment are set forth in table 39-H under this 
subject at end of chapter. 
Existing project was authorized by 1945 River and 
Harbor Act (P.L. 14, 79th Cong., 1st sess.). Construction 
funds were provided by Public Law 89-16. 
Estimated total cost for new work (July 1970) is $245, 
137,000, consisting of $245,000,000 Corps of Engineers 
funds, $135,000 for Coast Guard navigation aids, and 
$2,000 for value of public-owned lands. 
1183

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Local cooperation. None required. 
Operations and results during fiscal year. Acquisition of 
land continued. Work was completed on the $4,606, 
000 contract for relocation of Camas Prairie Railroad 
between Schultz Bar and Wawawai and for the Camas 
Prairie Railroad section facilities. Earnings under 
supply contracts for turbines, transformers, and governors 
continued. Main dam contract was awarded for 
$105,202,657. 
Condition at end of fiscal year. Acquisition of land is 
estimated to be 48 percent complete. Construction 
under main dam contract is progressing. Design is 
continuing for relocation of remaining portion of 
Camas Prairie Railroad from Wawawai to Lewiston. 
Supply contracts for three large turbines costing $4, 
061,000, three power transformers costing $1,038,000, 
and three turbine governors costing $324,000 are 95 
percent, 5 percent, and 61 percent complete, respectively. 
Invitations for bids for these large generators 
have yet to be issued. Preparation of specific 
design memoranda is continuing for the following: 
North Lewiston levee, West Lewiston levee, East 
Lewiston levee, Clarkston levee, utility relocations, and 
road relocations. Entire project, including land acquisition, 
is estimated to be about 17 percent complete. 
25. LOWER MONUMENTAL LOCK AND 
DAM, WASH. 
Location. On Snake River at head of Ice Harbor pool, 
about 45 miles northeast of Pasco, Wash. 
Existing project. Provides for construction of a dam, 
powerplant, navigation lock, relocation of railroads 
and highways above pool level at elevation 540 feet 
mean sea level, and appurtenant facilities. The 
impoundment extends about 30 miles upstream to the 
site of Little Goose Lock and Dam. The dam, located at 
upper end of the impoundment created by Ice Harbor 
Dam, raised water surface about 100 feet, and is 
concrete gravity with earthfill and rockfill abutments 
135 feet high (above streambed), and 3,800 feet long 
(including abutments, spillway, navigation lock and 
powerhouse). Fish ladders have been provided, one at 
each end of the dam. Powerhouse has three 135,000- 
kilowatt units installed initially, and a substructure for 
three additional units, for an ultimate total of 810,000 
kilowatts. Spillway is 508 feet long, and overflow crest 
at elevation 483 feet above mean sea level is surmounted 
by 8 radial gates, each 50 feet wide and 60.5 
feet high. Deck is at elevation 553 feet, and provides a 
service road and track for gantry crane. Navigation 
lock is single-lift type, with lock chamber 86 by 675 
feet, providing a minimum depth of 15 feet over lock 
sills. Reservoir capacity at elevation 540 is 376,000 
acre-feet. Principal data concerning navigation lock, 
, spillway dam, powerplant, and impoundment are set 
forth in table 39-H under this subject at end of chapter. 
Existing project was authorized by 1945 River and 
Harbor Act (P.L. 14, 79th Cong., 1st sess.). Estimated 
total cost for new work (July 1970) is $176,102,000 
including $176 million Corps funds, $87,000 Coast 
Guard funds for navigation aids, and $15,000 for value 
of public-domain lands. 
Local cooperation. None required. 
Operations and results during fiscalyear. New work, hired 
labor: Engineering and design work continued. 
New work, contract: The first stage development of 
recreation and public use areas was completed in 
August 1969. Work on powerhouse and installation of 
mechanical and electrical equipment was completed in 
March 1970. Permanent operators' quarters were 
completed in February 1970. Lake clearing was 
completed in December 1969. The second generator 
went on the line September 8, 1969, and the third 
generator, January 6, 1970. 
Operation and maintenance: Normal operation and 
maintenance continued. A total of 2,207,604 megawatt 
hours of electrical energy was delivered to Bonneville 
Power Administration, the marketing agency. Cargoes 
totaling 2,630 tons passed through navigation lock. 
Condition at end offiscalyear. Final design work is about 
99 percent complete. Construction started in fiscal year 
1961. The entire project is about 97 percent complete. 
Completed items include land acquisition (except one 
remaining parcel being acquired for environmental 
control), relocations (except deferred construction), 
dam, spillway, lock, fish ladders, Marmes rockshelter 
protective works, upstream floating guidewall, and 
three generators. 
26. MCNARY LOCK AND DAM, OREG. & 
WASH. (LAKE WALLULA) 
Location. On Columbia River 292 miles above mouth, 
near Umatilla, Oregon, and 3 miles above mouth of 
Umatilla River. 
Existing project. A dam, powerplant with 14-powerunit 
generating installation, navigation lock, fishways, 
attendant buildings and grounds, levees, drains, 
pumping plants, incidental irrigation, and modification 
of railroad bridges over Columbia and Snake 
Rivers in order to eliminate hazards to navigation. 
Principal data concerning navigation lock, spillway 
dam, powerplant, and impoundment are set forth in 
table 39-H under this subject at end of chapter. 
Existing project was authorized by 1945 River and 
Harbor Act (H. Doc. 704, 75th Cong., 3d sess.). 
Estimated total cost for new work (July 1970) is $289, 
212,000, consisting of $290,000,000 Corps of Engineers 
funds, a net reduction of $851,000 for cost and property 
transferred from project, and $63,000 for Coast Guard 
navigation aids. Construction of additional recreation 
facilities for completed project is estimated to cost $1, 
800,000, raising total project cost to $291,012,000. 
Local cooperation. None required. 
Operations and results during fiscalyear. New work: Work 
was continued under an agreement with NP Railway 
1184

WALLA WALLA, WASH., DISTRICT 
Co. which provides that they design and reconstruct 
their Snake River Bridge No. 3. Alteration of bridge 
substructure was completed and work was begun on the 
superstructure. 
Attempts to reach an agreement with Union Pacific 
Railroad for modification of their Columbia River 
Bridge having failed, this part of the program was 
eliminated from McNary project and turned over to 
U.S. Coast Guard for continuing action under Truman-
Hobbs Bridge Act. 
Code 710 Activity: Planning was continued for 
further development of recreation facilities in lake 
area. Additional land at Cold Springs site was 
acquired. Development was started at Two Rivers 
area, a site leased to Benton County, Washington. This 
work is being accomplished on a cost-sharing basis with 
the County. 
Operation and maintenance: Normal operation and 
maintenance of project continued. Approximately 5, 
865,183 megawatt hours of electrical energy were 
delivered to Bonneville Power Administration, the 
marketing agency. A total of 1,958,817 tons of 
commodities passed through the navigation lock. 
Installation of equipment at McNary powerhouse for 
remote control of lower Snake River dams continued in 
conjunction with Lower Monumental and Little Goose 
Dams. A contract for $19,600 was completed for 
construction of project main entrance signs and 
recreation area entrance signs. 
Condition at end of fiscal year. Construction of existing 
project started May 1947 and is 99 percent complete 
(June 1970). Project was placed on a permanent 
operating basis and pool raised to normal operating 
elevation 340 in December 1953. Except for maintenance 
interruptions, all 14 power units have been in 
commercial operation since February 1957. Modification 
to a railroad bridge over Snake River remains 
to complete project. 
Northern Pacific Railway Co. is progressing with 
reconstruction of its Snake River Bridge No. 3, and the 
work is 35 percent completed. Modification involves 
funding by two projects-McNary Lock and Dam and 
Lower Monumental Lock and Dam. When Northern 
Pacific Snake River branch of the railway was 
condemned in conjunction with Lower Monumental 
Lock and Dam project, traffic was subsequently 
rerouted over Northern Pacific Snake River Bridge No. 
3. In order to provide for increased traffic, load bearing 
capacity of bridge is being upgraded concurrently with 
navigation modification. 
27. SNAKE RIVER DOWNSTREAM FROM 
JOHNSON BAR LANDING, OREG., 
WASH., AND IDAHO 
Location. On Snake River downstream from Johnson 
Bar Landing, river mile 231. Snake River, which is 
largest tributary of Columbia River, rises in Yellowstone 
National Park, in western part of Wyoming, 
flows generally westerly for about 1,000 miles and 
empties into Columbia River near Pasco, Washington, 
324 miles from Pacific Ocean. 
Previous projects. For details see Annual Reports, page 
1981 for 1962, page 1991 for 1915, page 2246 for 1903, 
and page 1986 for 1906. 
Existing project. River and Harbor Act of 1945 (P.L. 
14, 79th Cong., 1st sess.) authorized construction of 
such dams as are necessary and open channel improvements 
for purposes of providing slackwater 
navigation and irrigation between mouth of Snake 
River and Lewiston, Idaho. This authorization modifies 
previous authorizations only for that portion of 
improvement below Lewiston, Idaho. Acts of June 13, 
1902, and August 30, 1935, as they pertain to open 
river improvement from Lewiston, Idaho, to Johnson 
Bar Landing are part of existing project. 
Improvements included in existing project and 
estimated Corps cost are Ice Harbor Lock and Dam, 
$160,500,000, including $2,800,000 for recreation 
facilities on completed project; Little Goose Lock and 
Dam, $152,000,000; Lower Granite Lock and Dam, 
$245,000,000; Lower Monumental Lock and Dam, 
$176,000,000; and open-river improvement, Lewiston 
to Johnson Bar Landing, $34,613. Total estimated cost 
is $733,534,613. 
Local cooperation. None required. 
Terminal facilities. On Snake River above Ice Harbor 
Dam are seven privately owned grain handling 
facilities which upon completion will all be equipped to 
load barges. Of these facilities four are in use and three 
are under construction. Also, there are four privately 
owned terminals below Ice Harbor Dam that provide 
for loading and unloading barges with petroleum 
products, chemicals, and Portland cement. In addition, 
there are four publicly owned marinas and 23 small 
boat launching ramps, all open to public use. Facilities 
are adequate until slackwater navigation is available 
and shipping volume increases following raising of pool 
behind Little Goose Dam. 
Operations and results during fiscal year. See individual 
reports for Lower Granite, Little Goose, Lower 
Monumental and Ice Harbor locks and dams. On 
Snake River from Lewiston, Idaho, to Johnson Bar 
Landing reconnaissance and condition surveys were 
conducted. Navigation aids were repaired and channel 
was renovated at Cottonwood Rapids. 
Condition at end of fiscal year. Costs of existing project 
were $483,844,962 for new work and $7,179,192 for 
maintenance, a total of $491,024,154 regular funds. 
Additional cost of existing project was $82,500 for new 
work from contributed funds for artificial spawning 
channel at Ice Harbor Lock and Dam project. (See 
table 39-I for summary of status of work on existing and 
previous project authorization.) 
1185

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
28. OTHER AUTHORIZED MULTIPLE 
PURPOSE PROJECTS 
.See table 39-J. 
GENERAL INVESTIGATIONS 
29. SURVEYS 
Total cost of surveys during fiscal year was $243,730. 
Of that amount $214,692 was for flood control studies, 
and $29,038 for cooperative studies with Soil Conservation 
Service and Bureau of Reclamation. 
30. COLLECTION AND STUDY OF BASIC 
DATA 
During the fiscal year, flood hazard data for a 
number of locations in the District were collected and 
analyzed. Information was provided to several Federal 
agencies, to the states of Idaho, Oregon, and Washington, 
and to several private organizations. 
Flood plain information reports were completed for 
Umatilla River in vicinity of Pendleton, Oregon, and 
for Portneuf River and Tributaries near Pocatello, 
Idaho. Flood plain information report on Big Wood 
River at Ketchum, Idaho and vicinity was complete at 
end of fiscal year but will not be presented to local 
people until first quarter of fiscal year 1971. In 
addition, a flood hazard information special report was 
completed for a 6.8-mile reach of Paradise Creek at 
Pullman, Washington and vicinity. 
Total fiscal year costs were $109,066. (See table 39-K 
on completed flood plain studies.) 
31. RESEARCH AND DEVELOPMENT 
Hydrologic investigations to improve runoff and 
streamflow forecasting procedures and flood frequency 
evaluations were continued from prior years. Studies 
were made of flood flows versus causes and of flood 
frequency statistics versus basin physical and hydrologic 
environment factors. Fiscal year cost of these 
studies was $5,715. 
1186

TABLE 39-A 
See 
Section 
in Text Project Funding 
2. Bear Creek, New Work: 
Kendrick, Idaho Approp. 
Cost 
3. Blackfoot Reser- New Work: 
voir, Idaho Approp. 
Cost 
4. Catherine Creek New Work: 
Lake, Oregon Approp. 
Cost 
5. Columbia River Basin New Work: 
Local Flood Protec- Approp. 
tion Projects Cost 
(Consolidated) 
6. Cottonwood Creek New Work: 
Dam, Idaho Approp. 
Cost 
7. John Day River, New Work: 
Oregon, Columbia Approp. 
River Basin, Local Cost 
Flood Protection 
Project 
8. Lapwai Creek, New Work: 
Culdesac, Idaho Approp. 
Cost 
9. Lucky Peak Lake, New Work: 
Idaho Approp. 
Cost 
Maint.: 
Approp. 
Cost 
10. Lyman Creek, Idaho New Work: 
Approp. 
Cost 
11. Mill Creek Lake, New Work: 
Washington Approp. 
Cost 
Maint.: 
Approp. 
Cost 
12. Portneuf River, New Work: 
Lava Hot Springs, Approp. 
Idaho Cost 
13. Ririe Lake, Idaho New Work: 
Approp. 
Cost 
14. Stuart Gulch Dam, New Work: 
Idaho Approp. 
Cost 
15. Tucannon River, New Work: 
Camp Wooten, Wash. Approp. 
Cost 
20. Dworshak Dam & New Work: 
Reservoir, Idaho Approp. 
Cost 
21. Ice Harbor Lock and New Work: 
Dam, Wash. (Lake Approp. 
Sacajawea) Cost 
Maint.: 
Approp. 
Cost 
WALLA WALLA, WASH., DISTRICT 
COST AND FINANCIAL STATEMENT 
Cost to 
FY67 FY68 FY69 FY70 June 30, 1970 
$ 850 
9,479 
10,000 
11,428 
$ 13,700 
5,183 
12,316 
5,849 
75,000 
55,498 
50,000 
21,987 
12,432 
16,000 
15,313 
129,000 
125,374 
127,000 
12,795 
108,500 
113,103 
4,000 
10,730 
350,000 
316,509 
5,011 
20,026,000 
20,518,035 
910,000 
687,819 
825,000 
860,185 
24,058 
3,500 
3,324 
12,800 
9,006 
213,000 
235,884 
35,336 
49,800 
49,261 
50,250 
3,703 
750,000 
657,581 
45,000 
27,916 
7,200 
966 
25,200,000 
24,223,607 
902,200 
1,004,806 
555,600 
661,329 
$ 65,000 
20,762 
7,000 
14,015 
96,000- 
89,589 
87,000 
95,116 
200,000 
60,523 
$ 40,027 
92,873 
84,000 
39,807 
300,000 
257,833 
26,100 
15,736 
-123,000 
25,288 
12,500 10,000 
3,322 10,603 
30,000 -300 
13,279 583 
118,100 138,104 
109,059 137,776 
- -80,100 
5,840 3,873 
49,300 
48,132 
33,234 
590,000 
374,807 
63,000 
59,577 
36,000 
3,504 
38,174,000 
32,178,113 
400,000 
435,742 
657,000 
678,833 
50,728 
52,257 
17,970 
22,175 
286,000 
526,526 
-1,100 
10,409 
-35,000 
3,801 
37,883,900 
44,057,455 
17,300 
50,232 
799,685 
722,922 
$133,518 
133,518 
183,316 
135,307 
396,000 
347,422 
73,171' 
73,171 
188,100 
166,350 
210,232 
209,2212 
43,800 
34,513 
19,380,2004 
19,352,1584 
1,539,944 
1,528,853 
83,000 
80,714 
2,230,6015,6 
2,230,6015,6 
1,077,198 
1,075,247 
107,220 
95,585 
2,936,038 
2,808,955 
106,900 
97,903 
15,700 
15,498 
144,319,100 
143,222,059 
129,664,4518 
129,526,271 
6,368,685 
6,253,673 
1187

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 39-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Cost to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
22. John Day Lock and New Work: 
Dam, Oreg. & Wash. Approp. $ 42,617,000 $40,800,000 $ 23,400,000 $ 13,422,662 $ 436,042,562 
(Lake Umatilla) Cost 43,161,336 41,001,484 22,001,484 11,799,011 431,780,754 
Maint.: 
Approp. 78,000 951,000 1,686,997 2,715,997 
Cost 75,983 941,953 1,622,695 2,640,631 
23. Little Goose Lock New Work: 
and Dam, Wash. Approp. 36,000,000 33,050,000 21,900,000 13,404,000 142,834,100 
(Lake Bryan) Cost 35,922,509 31,963,866 21,045,228 15,732,057 142,656,592 
Maint.: 
Approp. 174,261 174,261 
Cost 168,181 168,181 
24. Lower Granite Lock New Work: 
and Dam, Wash. Approp. 10,589,000 876,000 17,900,000 -1,496,000 41,133,823 
Cost 5,883,552 4,895,961 8,377,902 8,907,437 41,066,514 
25. Lower Monumental New Work: 
Lock and Dam, Wash. Approp. 23,400,000 20,686,500 14,300,000 7,640,000 170,629,999 
Cost 25,154,919 23,150,407 14,967,036 7,632,393 170,560,973 
Maint.: 
Approp. 60,500 574,440 634,940 
Cost 39,413 584,937 624,350 
26. McNary Lock and New Work: 
Dam, Oreg. & Wash. Approp. 95,000 215,000 900,000 1,770,500 288,817,1261 
(Lake Wallula) Cost 32,746 25,973 308,017 1,395,528 287,538,64410 
Maint.: 
Approp. 1,242,000 1,697,500 1,749,000 1,866,504 25,150,674 
Cost 1,429,281 1,617,826 1,858,283 1,902,130 25,069,848 
27. Snake River Down- New Work: 
stream from Approp. 70,899,000 55,514,700 54,500,000 19,565,300 484,697,13611 
Johnson Bar Landing, Cost 67,648,799 61,015,039 44,825,909 32,322,119 484,245,112 
Oreg., Wash., & Maint.: 
Idaho Approp. 825,557 572,512 738,301 1,553,766 7,497,44212 
Cost 862,272 675,411 742,040 1,481,425 7,365,7621 
1. Comprises the following conditionally authorized projects: 
Camas Creek, Idaho; Lower Walla Walla River, Wash.; Mill 
Creek, Wash.; Mud Lake Area, Idaho; Palouse River, Wash.; 
Payette Valley, Idaho; South Fork Clearwater river, Idaho; 
Teton River, Idaho; Touchet River, Wash.; and Whitebird Creek, 
Idaho. Excludes projects reported under "Other Authorized 
Flood Control Projects": Blackfoot Area, Snake River, Idaho; 
Blackfoot River, Idaho; Boise Valley, Idaho; Grande Ronde 
Valley, Oregon; Heise-Roberts Extension, Idaho; Kendrick, 
Potlatch River, Idaho; Little Wood River (Carey), Idaho; 
Malheur River, Oregon; Portneuf River and Marsh Creek, Idaho; 
Shelley Area, Snake River, Idaho; Umatilla River (Echo), 
Oregon; and Weiser River, Idaho. Excludes John Day River Area, 
Oregon, project reported in detail in an individual report. Does 
not include amounts for improvements in Portland and Seattle 
Districts. 
2. Includes an estimated $71,000 spent for planning on 
infeasible areas. 
3. Includes $298,950 allocated under Code 710, Recreation 
Facilities on Completed Projects. 
4. Includes $270,908 expended under Code 710, Recreation 
Facilities on Completed Projects. 
5. Excludes $80,000 contributed funds. 
6. Includes $68,446 Code 710, Recreation Facilities on 
Completed Projects. 
7. Includes $103,478 allotted under Code 710, Recreation 
Facilities on Completed Projects. 
8. Includes $83,673 expended under Code 710, Recreation 
Facilities on Completed Projects. Excludes $82,500 contributed 
for artificial spawning channel. 
9. Includes $302,126 allotted under Code 710, Recreation 
Facilities on Completed Projects. 
10. Includes $850,375 net value of cost or property transferred 
from project. Includes $301,209 expended under Code 
710, Recreation Facilities on Completed Projects. 
11. Includes $400,150 for new work on previous projects 
(Pasco to Lewiston). Excludes $167,500 contributed funds for 
new work consisting of $85,000 on previous projects (Pasco to 
Riparia), plus $82,500 for new work on existing artificial 
spawning channel (Ice Harbor Lock and Dam Project). 
12. Includes $186,570 for maintenance on previous projects 
(Pasco to Lewiston). 
1188

WALLA WALLA, WASH., DISTRICT 
TABLE 39-B OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Columbia River and Tributaries above Celilo 
Falls to Kennewick, Wash.' 1968 $ 1,851,195 $ 1,108,259 
Umatilla Harbor, Oreg.2 1952 
1. Obviated by The Dalles, John Day, and McNary Projects. 
2. Obviated by John Day Project. 
TABLE 39-D INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 16 of Text) 
Number of Month Number of Month 
River Basin Projects Inspected River Basin Projects Inspected 
Blackfoot 1 March 1970 Portneuf 1 January 1970 
Boise 1 April 1970 Potlatch 1 November 1969 
Esquatzel Coulee 1 July 1969 Salmon 2 August 1969 
Little Wood 1 August 1969 Snake 6 June 1970 
Malheur 1 May 1970 Touchet 2 August 1969 
Mission Creek 1 November 1969 Umatilla 2 January 1970 
Palouse 1 November 1969 Walla Walla 3 January 1970 
Yakima 1 June 1969 
TABLE 39-F FLOOD CONTROL WORKS UNDER SPECIAL AUTHORIZATION 
(See Section 19 of Text) 
Fiscal Fiscal 
Year Year 
Project Costs Project Costs 
Asotin Creek, Asotin, Idaho $2,690 Payette River, Idaho - Chapman Location $ 6,845 
Beech Creek, Mt. Vernon, Oreg. 8,224 Riverview Area, Pasco, Wash. 4,107 
Big Canyon Creek, Peck, Idaho 498 Shobe Canyon, Heppner, Oreg. 3,418 
Lapwai Creek, Sweetwater, Idaho 8,212 Snake River, Stephens Loc., Blackfoot, Idaho 1,226 
Lwyers Creek, Kamiah, Idaho 1,041 South Fork Clearwater River, Kooskia- 
Little Canyon Creek, Glenns Ferry, Idaho 1,008 Stites Loc., Idaho 1,240 
Lower Coppei Creek, Wash. 8,499 Stage Gulch, Stanfield, Oreg. 5,150 
Lower Dry Creek, Lowden, Wash. 3,585 Touchet River, Waitsburg, Wash. 18,787 
Orofino Creek, Orofino, Idaho 434 Umatilla River, Riverside-Mission, Oreg. 7,650 
TABLE 39-G FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION: 
SNAGGING AND CLEARING 
(See Section 19 of Text) 
Fiscal Year 
Project and Location Costs Completed 
Big Wood River, Gimlet, Idaho $42,875 October 1969 
Dixie Creek, Prairie City, Oreg. 12,568 August 1969 
1189

TABLE 39-C 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
COLUMBIA RIVER BASIN, LOCAL FLOOD PROTECTION PROJECTS 
(WALLA WALLA DISTRICT) 
(See Section 5 of Text) 
Estimated Status June 30, 1970 
Federal 
Project Cost Appropriated Cost 
Blackfoot Area, Snake River, Idaho1 
Blackfoot River, Idaho1 
Boise Valley, Idaho1 
Ada County Unit3 
Canyon County Unit 4 
Camas Creek (feasibility doubtful) s 5 
Grande Ronde Valley, Oreg. 1 ,6 
Heise-Roberts Extension, Idaho1 
Henrys Fork Unit6 
Snake River Unit 
John Day River Area, Oreg. 3,7 
Kendrick, Potlatch River, Idaho1 
Little Wood River, Carey, Idaho ,8 
Lower Walla Walla R., Wash. (not feasible) 
Malheur River, Oreg. 
Vale Unit1 
Willow Creek Unit1 
Mill Creek, Wash. (not feasible) 
Mud Lake Area, Idaho (not feasible) 
Palouse River, Wash. 6 
Payette Valley, Idaho6 
Portneuf River and Marsh Creek, Idaho 7 
Pocatello Unit 
Inkom-Marsh Creek Unit1 0 
Shelley Area, Snake River, Idahol 
South Fork Clearwater River, Idaho 1 1 
Teton River, Idaho (not feasible) 
Touchet River, Wash. (not feasible) 
Umatilla River, Echo, Oreg.1 ,12 
Weiser River, Idahol ,6 
Whitebird Creek, Idaho11 
Total 
2
2 
944,000 
652,800 
8,639,000 
165,000
2 
792,000 
2 
64,000
2 
266,000 
914,000
2 
750,000 
2 
879,000 
1,490,000 
- 
$ 42,796 
391,143 
46,084 
10,600 
9,080 
102,458 
27,800 
3,375,158 
210,232 
59,941 
21,334 
4,000 
325,580 
13,000 
3,537 
5,996 
23,178 
6,456,032 
32,335 
3,899 
10,387 
11,198 
24,145 
88,427 
1,896 
$11,300,236 
1. Reported under "Other Authorized Flood Control 
Projects." 
2. Completed Project 
3. Economic justification of work proposed has been established 
in compliance with conditions set forth in Flood Control 
Act of 1950. 
4. Deauthorized. Five-year limitation on project authorization 
reached April 18, 1967 
5. Deauthorized. Five-year limitation on project authorization 
reached March 23, 1965 
6. Deferred for restudy. 
7. Reported in detail in an individual report. 
8. Deauthorized. Five-year limitation on project authorization 
reached April 21, 1965. 
9. Deauthorized. Five-year limitation on project authorization 
reached October 13, 1969. 
10. Inactive for lack of local cooperation. 
11. Emergency construction at this location has obviated 
need for project. 
12. Deauthorized. Five-year limitation on project authorization 
reached November 19, 1964. 
13. Includes $75,000 spent on infeasible Cambridge and 
Midvale areas. 
NOTE: This list does not include improvements in Portland 
and Seattle Districts. 
1190 
$ 42,796 
391,143 
46,084 
10,600 
9,080 
102,458 
27,800 
3,37 5,158 
209,221 
59,941 
21,334 
4,000 
325,580 
13,000 
3,537 
5,996 
23,178 
6,456,032 
32,335 
3,899 
10,387 
11,198 
24,145 
88,42713 
1,896 
$11,299,225

WALLA WALLA, WASH., DISTRICT 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Arlington, Alkali Canyon, Oreg. 
Blackfoot Area, Snake River, Columbia River 
Basin, Idaho 
Blackfoot River, Columbia River Basin, Idaho 
Boise Valley, Columbia River Basin, Idaho 
(a) Ada County Unit 
(b) Canyon County Unit5 
Colfax, Palouse River, Wash. 
Connell, Wash.6 
Dayton, Touchet River, Wash. 
Grande Ronde Lake, Oreg. 
Grande Ronde Valley, Columbia River Basin, 
Oreg.7 
Heise-Roberts Area, Snake River, Idaho 
Heise-Roberts Extension, Columbia River 
Basin, Idaho 
(a) Henrys Fork Unit 
(b) Snake River Unit 
Jackson Hole, Snake River, Wyo. 
Kendrick, Potlatch River, Columbia River 
Basin, Idaho 
Lewiston-Clarkston Levees8 
Little Wood River (Carey), Columbia River 
Basin, Idahos 
Malheur Improvement District, Snake River, 
Oreg. 
Malheur River, Columbia River Basin, Oreg. 
(a) Vale Unit 
(b) Willow Creek Unit s 
Milton-Freewater, Walla Walla River, Oreg. 
Mission and Lapwai Creeks, Idaho6 
Pendleton Levees, Umatilla River, Oreg. 
(a) Riverside Area Unit7 
(b) State Hospital Area (Zone 1) 
Pendleton, Umatilla River, Oreg. 
Pilot Rock, Birch Creek, Oreg.10 
Portneuf River and Marsh Creek, Columbia 
River Basin, Idaho 
(a) Inkom-Marsh Creek Unit 1 1 
(b) Pocatello Unit 
Pullman, Palouse River, Wash. 7 
Shelley Area, Snake River, Columbia River 
Basin, Idaho 
Umatilla River (Echo), Columbia River 
Basin, Oreg. 
Weiser River, Columbia River Basin, Idaho 7 
Willow Creek Lake, Heppner, Oreg. 
Yakima River, West Richland, Wash.6 
19502 $ 23,4393 $ - 
1958 
1965 
1967 
1966 
1967 
1966 
1966 
1958 
1955 
1968 
1967 
1960 
1950 
1960 
1957 
1961 
1968 
1965 
1960 
1939 
1963 
1969 
1964 
1958 
1960 
1960 
1966 
1964 
42,7964 
391,1434 
46,084 
10,600 
5,556,0084 
292,7924 
380,6174 
102,458 
1,575,8384 
27,800 
3,375,1584 
2,232,6814 
59,9414 
21,334 
55,8944 
325,5804 
13,000 
1,784,4804 
54,5384 
9,100 
267,748 
143,2634 
4,558 
6,456,0324 
79,370 
32,3354 
24,145 
88,42712 
238,8904 
1191 
TABLE 39-E

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
1. Abandoned. Necessity for development was eliminated 
when Lake Umatilla was created. 
2. Reported by Portland prior to 1956. 
3. Includes $3,328 spent in fiscal year 1960 under 
authorization of P.L. 685, 84th Congress. See Annual Report for 
fiscal year 1960, page 1887. 
4. Completed project. 
5. Deauthorized. For specific date, see comprehensive report 
for Columbia River Basin Local Protection Project. 
6. Adopted for construction by Chief of Engineers. 
7. Deferred for restudy. 
8. Withdrawn as a local flood protection project in June 
1959. Included as a feature of Lower Granite Lock and Dam, 
Snake River, Wash. 
9. In addition, $6,300 was expended from contributed 
funds. 
10. Deauthorized. Five-year limitation on project authorization 
reached December 2, 1968. 
11. Inactive. Lacks local cooperation and establishment of 
economic justification. 
12. Includes an estimated $75,000 spent for planning on 
infeasible areas. 
1192 
TABLE 39-E (Cont'd)

PRINCIPAL DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM, POWERPLANT, AND IMPOUNDMENT 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Generating Units: 
Number to be Installed 
Space for Additional 
Rating, Each 
Total Capacity to be Installed 
Total Potential Capacity 
Maximum Structural Height 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Flood Control Storage 
Lake Length 
Lake Water Surface Area at 
Elevation 1600 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift:
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Generating Units: 
Number Installed 
Space for Additional 
Rating, Each 
Total Installed Capacity 
Total Potential Capacity 
Maximum Structural Height 
First Power-On-Line 
Concrete Gravity 
Under Construction 
150,000 Cubic Feet 
Per Second 
1545 
Tainter 
50 Ft. by 55 Ft. 
2
428 Feet 
33 
2 @ 90,000 kw; 4 @ 
220,000 kw 
400,000 kw 
1,060,000 kw 
717 Feet 
1600-1445 
1605 
2,016,000 Ac. Ft. 
53.6 Miles 
17,090 Acres 
175 Miles 
86 Feet 
675 Feet 
97 Feet 
100 Feet 
103 Feet 
15 Feet 
April 1962 
Concrete Gravity 
January 1962 
850,000 cfs 
391 
Tainter 
50 Ft. by 53 Ft. 
10 
671 Feet 
3
3
3 @ 90,000 kw; 3 @ 
110,960 kw 
270,000 kw 
602,880 kw 
208 Feet 
December 1961 
1193 
TABLE 39-H 
Section 
WALLA WALLA, WASH., DISTRICT 
Project 
20. 
21. 
Dworshak Dam and 
Reservoir, Idaho 
Ice Harbor Lock 
and Dam, Wash.

TABLE 39-H (Cont'd) 
Section 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
PRINCIPAL DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM, POWERPLANT, AND IMPOUNDMENT 
Project 
Ice Harbor Lock 
and Dam, Wash. 
John Day Lock 
and Dam, Oreg. 
and Wash. 
Little Goose Lock 
and Dam, Wash. 
21. 
(Cont'd) 
440-437 
446 
31.9 Miles 
9,200 Acres 
14 Ft. by 250 Ft. 
80 Miles 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 
440 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Width 
Generating Units: 
Number Installed 
Space for Additional 
Rating, each 
Total Installed Capacity 
Total Potential Capacity 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Flood Control Storage 
Lake Length 
Lake Water Surface Area at Elevation 
268 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
Concrete Gravity 
March 1968 
2,250,000 cfs 
210 
Tainter 
50 Ft. by 58.5 Ft. 
20 
1,975 Feet 
243 Feet 
16 
4
135,000 kw 
2,160,000 kw 
2,700,000 kw 
235 Feet 
July 1968 
268-257 
276 
500,000 Ac.Ft. 
76.4 Miles 
55,000 Acres 
14 Ft. by 250 Ft. 
200 Miles 
86 Feet 
675 Feet 
93 Feet 
98 Feet 
101 Feet 
15 Feet 
May 1970 
1194 
86 Feet 
675 Feet 
97 Feet 
105 Feet 
113 Feet 
15 Feet 
April 1968 
22. 
23.

WALLA WALLA, WASH., DISTRICT 
TABLE 39-H (Cont'd) PRINCIPAL DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM, POWERPLANT, AND IMPOUNDMENT 
Project 
Little Goose Lock 
and Dam, Wash. 
Lower Granite Lock 
and Dam, Wash. 
23. SPILLWAY DAM 
(Cont'd) Concrete Gravity 
January 1970 
850,000 cfs 
581 
Tainter 
50 Ft. by 59 Ft. 
8 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Generating Units: 
Number Installed 
Space for Additional 
Rating, Each 
Total Installed Capacity 
Total Potential Capacity 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 
638 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
SPILLWAY DAM 
Type of Construction 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Width 
Generating Units: 
Number to be Installed 
Space for Additional 
Rating, Each 
Total Capacity to be Installed 
Total Potential Capacity 
Maximum Structural Height 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 
738 
Navigation Channel, Depth by Width 
Length of Shoreline 
638-633 
646.5 
37.2 Miles 
10,025 Acres 
14 Ft. by 250 Ft. 
92 Miles 
86 Feet 
675 Feet 
95 Feet 
100 Feet 
105 Feet 
15 Feet 
Concrete Gravity 
850,000 cfs 
681 
Tainter 
50 Ft. by 59 Ft. 
8
656 Feet 
243 Feet 
3
3
135,000 kw 
405,000 kw 
810,000 kw 
228 Feet 
738-733 
746.5 
39 Miles 
8,900 Acres 
14 Ft. by 250 Ft. 
91 Miles 
1195 
Section 
656 Feet 
3
3
135,000 kw 
405,000 kw 
810,000 kw 
235 Feet 
March 1970 
24.

TABLE 39-H (Cont'd) 
Section 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
PRINCIPAL DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM, POWERPLANT, AND IMPOUNDMENT 
Project 
NAVIGATION LOCK 
Lower Monumental 
Lock and Dam, 
Wash. 
McNary Lock and 
Dam, Oreg. and 
Wash. 
25. ' 86 Feet 
675 Feet 
97 Feet 
100 Feet 
103 Feet 
15 Feet 
April 1969 
Concrete Gravity 
March 1969 
850,000 cfs 
483 
Tainter 
50 Ft. by 59 Ft. 
8 
Clear Width 
Clear Length 
Lift:
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Width 
Generating Units: 
Number Installed 
Space for Additional 
Rating, Each 
Total Installed Capacity 
Total Potential Capacity 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 
540 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift:
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width, by Height 
Number 
540-537 
548 
29 Miles 
6,590 Acres 
14 Ft. by 250 Ft. 
78 Miles 
86 Feet 
675 Feet 
67 Feet 
72 Feet 
83 Feet 
15 Feet 
December 1953 
Concrete Gravity 
October 1953 
2,200,000 cfs 
291 
Vertical Lift 
50 Ft. by 53 Ft. 
22 
1196 
656 Feet 
243 Feet 
3
3
135,000 kw 
405,000 kw 
810,000 kw 
226 Feet 
May 1969 
26.

WALLA WALLA, WASH., DISTRICT 
TABLE 39-H (Cont'd) 
Section 
PRINCIPAL DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM, POWERPLANT, AND IMPOUNDMENT 
Project 
McNary Lock and 
Dam, Oreg. and 
Wash. 
POWERPLANT 
Length 
Generating Units: 
Number Installed 
Rating, Each 
Total Installed Capacity 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 
340 
Navigation Channel, Depth by Width 
Length of Shoreline 
1,348 Feet 
14 
70,000 kw 
980,000 kw 
220 Feet 
November 1953 
340-335 
356.5 
64 Miles 
38,800 Acres 
14 Ft. by 250 Ft. 
242 Miles 
1197 
451-584 0-72-76 
26. 
(Cont'd)

TABLE 39-I 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
SNAKE RIVER DOWNSTREAM FROM JOHNSON BAR LANDING, 
OREG., WASH., AND IDAHO 
(See Section 27 of Text) 
Estimated Total New 
Cost (Corps Work Appro- Cost to June 30, 1970 
of Engineers priations to Percent Construction 
Project Funds only) June 30, 1970 New Work Maintenance Completed Started 
Ice Harbor Lock and DamI $160,500,000 $129,664,451 $129,526,271 $6,253,674 822 Jan. 1956 
Little Goose Lock and DamI 152,000,000 142,834,100 142,656,591 168,181 94 June 1963 
Lower Granite Lock and DamI 245,000,000 41,133,823 41,066,514 - 17 July 1965 
Lower Monumental Lock and Dam1 176,000,000 170,629,999 170,560,973 624,351 97 June 1961 
Open River Improvement - Lewiston 
to Johnson Bar Landing 34,613 34,6133 34,6134 128,636 
Open River Improvement - Pasco 
to Lewiston - - - 4,350 
Total Existing Project $733,534,613 $484,296,986 $483,844,962 $7,179,192 
Previous Projects - Pasco to Lewiston 400,150 400,150 400,150 186,570 
Total Authorized Projects $733,934,763 $484,697,136 $484,245,112 $7,365,762 
1. See individual report. 3. Includes $2,800,000 for Code 710 recreation facilities on 
completed project. 
2. Entire project including additional power units, but exclu- 4. Maintenance accomplished prior to 1953 with new work 
sive of Code 710 recreation facilities. funds. 
TABLE 39-J OTHER AUTHORIZED MULTIPLE PURPOSE PROJECTS 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Asotin Dam, Snake River, Idaho and 
Washington 1964 $ - $ - 
TABLE 39-K COMPLETED FLOOD PLAIN STUDIES 
(See Section 30 of Text) 
Location Requesting Agency Date Completed Federal Cost 
Richland, Wash. City of Richland July 1963 $ 4,467 
(Yakima River) 
Boise, Idaho City of Boise and Ada County Nov. 1967 26,958 
(Boise River) 
Orofino, Idaho City of Orofino and May 1968 7,986 
(Clearwater River) Clearwater County 
Walla Walla, Wash. Walla Walla County July 1968 23,954 
(Walla Walla River 
tributaries) 
Payette, Idaho Payette County Sept. 1968 23,800 
(Payette River) 
Pullman, Wash. City of Pullman May 1969 15,969 
(S. F. Palouse River 
&Missouri Flat Cr.) 
City of John Day and City of John Day, Canyon City, Sept. 1969 9,968 
Canyon City, Oreg. and Grant County 
(Canyon Creek) 
Pendleton, Oreg. Umatilla County Jan. 1970 19,684 
(Umatilla River) 
Pocatello, Idaho Bannock County May 1970 26,679 
(Portneuf River) 
1198

ALASKA DISTRICT* 
This District Consists of the State of Alaska. 
IMPROVEMENTS 
Navigation Page 
1. Anchorage Harbor, Alaska .................. 1199 
2. Bethel Small Boat Harbor, Alaska ....... 1200 
3. Cordova Harbor, Alaska ................... 1200- 
4. Dillingham Harbor, Alaska ............... 1200 
5. Egegik River, Alaska ............................ 1201 
6. Homer Harbor, Alaska ................... 1201 
7. Kake Harbor, Alaska ............................ 1201 
8. King Cove Harbor, Alaska .................. 1202 
9. Myers Chuck Harbor, Alaska ................ 1202 
10. Ninilchik Harbor, Alaska ..................... 1202 
11. Nome Harbor, Alaska ............... 1203 
12. Sergius-Whitestone Narrows, Alaska ... 1204 
13. Sitka Harbor, Alaska ............................ 1204 
14. Skagway Harbor, Alaska ................... 1204 
15. Stikine River, Alaska ............................... 1205 
16. Other Authorized Navigation Projects .. 1205 
17. Navigation Work Under Special 
Authorization ..................... 1205 
Beach Erosion Control 
18. Beach Erosion Control Work Under 
Special Authorization ..................... 1205 
19. 
20. 
21. 
22. 
23. 
24. 
25. 
26. 
27. 
28. 
29. 
Flood Control Page 
Chena River Lakes, Alaska .................... 1205 
Klutina River, Copper Center, Alaska 1206 
Inspection of Completed Flood Control 
Projects .................... .................. 1206 
Other Authorized Flood Control 
Projects ........................................ 1206 
Flood Control Work Under Special 
Authorization ................................... 1206 
Talkeetna River, Alaska ....................... 1206 
Multziple-Purpose Projects Including Power 
Snettisham, Alaska ................................... 1206 
Bradley Lake, Alaska .............................. 1207 
General Investigations 
Surveys ......................... ......................... 1207 
Collection and Study of Basic Data ..... 1207 
Research and Development .................... 1207 
NAVIGATION 
1. ANCHORAGE HARBOR, ALASKA 
Location. Anchorage is in southcentral Alaska on 
southeast shore of Knik Arm and north of Turnagain 
Arm near junction with Cook Inlet. (See Coast and 
Geodetic Survey Charts 8553 and 8557.) 
Existing project. Provides for a deepwater harbor by 
dredging adjacent to existing and proposed municipal 
docks to a depth of 35 feet below mean lower low water 
and constructing two jetties of other protective works 
where required, along northerly and southerly ends. 
Tidal range between mean lower low water and mean 
higher high water is 28.1 feet and extreme range is 40.7 
feet, based on preearthquake data. Large ice masses in 
winter months form into floe ice making it extremely 
hazardous for small boat navigation during that 
period. (See table 40-B for authorizing legislation.) 
Local cooperation. Local interests must provide easements, 
rights-of-way, and spoil-disposal areas; hold the 
United States free from damages; and construct wharf 
facilities adequate for handling of cargo. 
Terminal facilities. Four wharves capable of handling 
ocean going vessels and open for public use consist of 
two owned by the city, of which one is an oil handling 
and bunkering facility, and two are privately owned. 
Five additional wharves are privately owned and used 
for industrial purposes. A government owned wharf, 
damaged by the 1964 earthquake, has been reduced in 
size through removal and deterioration and is unuseable. 
Operations and results during the fiscal year. Regular 
funds, maintenance: Maintenance dredging to a depth 
of 37 feet, including advance maintenance, adjacent to 
the POL dock and city dry cargo wharf was accomplished 
July, August, and September 1969 by 
removal of 86,006 cubic yards of material at a cost of 
$396,502. Project sedimentation studies continued. 
Project condition survey was accomplished April 1970. 
Condition at end of fiscal year. Maintenance dredging 
was accomplished jointly by local interests and the 
United States Army to provide a depth of 35 feet 
alongside the City Dock and 32 feet at a distance of 50 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
1199

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
feet from the Ocean Dock in July 1961. Emergency 
dredging was performed off the face of the City Dock 
July and August 1965. The first phase of new work in 
the authorized project consisting of dredging the port 
area to a depth of 35 feet began October 1966 and was 
completed June 1967. Additional emergency dredging 
off the face of the City Dock was accomplished May 
and June 1969. 
2. BETHEL SMALL BOAT HARBOR, 
ALASKA 
Location. The village of Bethel is 65 miles up river on 
the north bank of the Kuskokwim River which flows 
through southwestern Alaska. (See Coast and Geodetic 
Survey Chart 9302.) 
Existing project. Proposed project includes provision of 
a 7,700-foot long small boat harbor and entrance 
channel by deepening, widening and straightening of 
the upper 6,800 feet of Brown's Slough. (See table 
40-B for authorizing legislation.) 
Local cooperation. Local interest will provide, maintain, 
and operate, without cost to the United States, as 
needed for transient and local operators, adequate 
public access roads, parking areas, and other needed 
public use shore facilities, open and available to all on 
equal terms. Provide, without cost to the United States, 
all necessary lands, easements, and rights-of-way 
required for construction and subsequent maintenance 
of the project, including suitable spoil disposal areas 
with any necessary retaining dikes, bulkheads, and 
embankments therefor. Hold and save the United 
States free from damages that may result from 
construction and maintenance of the project. Accomplish, 
without cost to the United States, alterations 
and relocations as required in sewer, water supply, 
drainage, and other utility facilities. Establish regulations 
concerning discharge of untreated sewage, 
garbage, and other pollutants in the waters of the 
anchorage by users thereof, which regulations shall be 
in accordance with applicable laws or regulations of 
Federal, State, and local authorities responsible for 
pollution prevention and control, and assure full 
responsibility for all project costs in excess of the 
Federal cost limitation of $500,000. 
Operations and results during fiscal year. Regular funds, 
new works: Preconstruction planning was initiated and 
is underway. 
Condition at end of fiscaly ear. Navigation improvement 
was adopted on 30 December 1969. Preliminary design 
work on plans and specifications are underway. 
3. CORDOVA HARBOR, ALASKA 
Location. On Orca Inlet, a strait near eastern 
entrance to Prince William Sound, Alaska, about 150 
air miles south-southeast of Anchorage, Alaska. (See 
Coast and Geodetic Survey Charts 8520, 8525, and 
8551.) 
Existing project. A sheltered harbor for small boats 
about 8.26 acres in area with a depth of 10 feet at mean 
lower low water and 10.4 acres in area with a depth of 
14 feet at mean lower low water protected by a north 
breakwater about 1,100 feet long and a south breakwater 
about 1,400 feet long. Tidal range between mean 
lower low water and mean higher high water is 12.4 
feet, with an extreme range of 22 feet, based on 
preearthquake data. (See Table 40-B for authorizing 
legislation.) 
Local cooperation. None required. 
Terminal facilities. One privately owned wharf, 
capable of handling deep draft vessels, has oil-handling 
and bunkering facilities and is open for public use as 
passenger and general-cargo terminal. The municipal 
dock, with capability of handling deep draft vessels is 
open for use as passenger and general-cargo terminal. 
State of Alaska ferry terminal, a public loading dock, 
and Fish and Wildlife Service float are in the small 
boat harbor. Three additional wharves are privately 
owned and used for industrial purposes. Facilities are 
considered adequate for present commerce. 
Operations and results during the fiscal year. Regular 
funds, maintenance: Dredging of a shoal at the 
entrance to the small boat basin to a depth of 15 feet 
below mean lower low water was accomplished in April 
and May 1970. 5,700 cubic yards of material were 
removed at a cost of $34,320.00. Reestablishment of 
harbor lines is continuing. Project condition survey was 
accomplished during July and August 1969. 
Condition at end of fiscal year. The harbor with 
protecting breakwaters designed for future expansion 
within breakwater area and original construction was 
completed October 1938. Maintenance dredging was 
completed October 1962. Area uplift of 6.5 feet average 
resulting from the March 1964 earthquake necessitated 
harbor rehabilitation. Construction was initiated June 
1964 for restoration phase and November 1964 for 
expansion phase. Project was essentially completed 
June 1965. Minor north breakwater repair contract 
was completed October 1965. Contract to construct an 
entrance breakwater was completed October 1966. 
4. DILLINGHAM HARBOR, ALASKA 
Location. At head of Nushagak Bay, an arm of Bristol 
Bay on right bank of Nushagak River just below its 
confluence with Wood River, and about 470 miles 
northeasterly of Dutch Harbor, Alaska. (See Coast and 
Geodetic Survey Chart 9052.) 
Existing Project. A small boat basin 230,000 square 
feet in area with a depth of 2 feet above mean lower low 
water along Scandinavian Creek with entrance channel 
1,100 feet long and a bottom width of 40 feet in 
Scandinavian Creek, and sheet-pile sill across the basin 
outlet with a top elevation of 7 feet above mean lower 
low water. During design stage the project was revised 
to include a rock sill with adjacent scour-protection 
blankets and the embankment was relocated to include 
a berm between the basin and embankment. Tidal 
range between mean lower low and mean higher high 
water is 19.8 feet. Extreme range is 27.5 feet. (See table 
40-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
1200

ALASKA DISTRICT 
Terminal facilities. Three docks at the village of 
Dillingham, all privately owned, two are used for 
salmon-cannery operations and one as an oil-handling 
and bunkering terminal. Facilities are considered 
adequate for existing commerce. Approach and floats 
were installed in small boat basin in summer of 1963. 
Floats are removed before fall freezeup and replaced 
each spring to the extent permissable, governed by 
shoaling conditions. 
Operations and results during fiscal year. Regular funds, 
maintenance: Government plant and hired labor, 1 
July through 25 October 1969 and 11 May through 30 
June 1970, dredged 57,524 cubic yards of material 
from the basin area at a cost of $93,950. Project 
sedimentation study is continuing. 
Condition at end of fiscal year. Project was essentially 
completed in September 1961. The partially completed 
rock sill was damaged during the 1961 winter season 
closure and the basin silted in. Restoration of the rock 
sill and dredging of the basin commenced in May and 
was completed July 1962. A study of siltation was 
completed September 1966. An eight-inch cutterhead 
dredge purchased for annual maintenance of the basin 
was delivered June 1969 and dredging began 27 June 
1969 and continued through October 1969 when work 
shutdown for winter. Annual maintenance dredging 
was reactivated May 1970. 
5. EGEGIK RIVER, ALASKA 
Location. Egegik River, located on the Alaska 
Peninsula in southwestern Alaska, is the outlet of 
Becharof Lake and flows northwesterly from the lake 
for a distance of about 34 miles into Bristol Bay, 470 
miles northeasterly from Dutch Harbor. (See wall map 
of Alaska by the Mineral Resources Branch of the U. S. 
Geological Survey.) 
Existing project. This provides for a channel 100 feet 
wide, 5 feet deep, and about 2,500 feet long through the 
rapids at the head of the river by the removal of 
obstructing boulders and the erection of suitable ranges 
to mark the channel. The flow of the river is so well 
regulated by the lake that the maximum range, except 
for tidal action at the mouth, is only 2 feet. The 
estimate of cost for new work, made in 1932, was $5, 
000. (See table 40-B for authorizing legislation.) 
Terminal facilities. There are no terminal facilities. 
Operations and results during fiscal year. Regular funds, 
maintenance: Funds in the amount of $30,000 were 
appropriated for removal of additional boulders. Due 
to lack of response to the invitation for bids the work 
has been deferred until fiscal year 1971. 
Condition at end of fiscal year. The existing project was 
completed in 1941. 
6. HOMER HARBOR, ALASKA 
Location. In Kachemak Bay, on Kenai Peninsula, 152 
miles by water southwest of Anchorage and 15 miles 
northeast of Seldovia. Harbor site is land based near 
the extremity of Homer Spit which varies to onequarter 
mile in width and extends 4.5 miles southeasterly 
from the mainland. (See Coast and Geodetic 
Survey Charts 8554 and 8531.) 
Previous project. For details see page 1593 of Annual 
Report for 1964. 
Existing project. Provides for sheltered small boat 
harbor, relocated and land based within Homer Spit 
about 10 acres in area with a 2.75 acre berthing area 12 
feet deep and 7.25 acre anchorage area 15 feet deep 
with a north entrance channel, protected by a main 
rock breakwater 1,018 feet long and secondary rock 
breakwater 238 feet long. Plane of reference is mean 
lower low water. Tidal range between mean lower low 
and mean higher high water is 18.2 feet, with an 
extreme range of 28.5 feet, based on preearthquake 
data. (See table 40-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. One publicly owned and operated 
wharf capable of handling ocean going vessels and 
serving passenger and general-cargo is adequate for 
existing commerce. 
Operations and results during fiscal year. Regular funds, 
maintenance: The entrance channel was dredged to a 
depth of 17 feet, including advance maintenance, by 
removal of 16,067 cubic yards of material in September 
1969 at a cost of $77,661. Reestablishment of harbor 
lines is continuing. 
Condition at end of fiscal year. The harbor was 
essentially destroyed by the March 1964 earthquake. 
Emergency repair work, which included raising the 
first leg of the breakwater, was accomplished July and 
August 1964. The harbor was restored by construction 
of an extension to the breakwater, removal of the part 
of the original breakwater to form an entrance, 
removal of basin material inland and disposal of the 
material to form a protective berm around the 
landward side of the basin. Restoration work began 
August 1964 and was completed May 1965. Expansion 
of the harbor began November 1964 and was completed 
March 1965. A contract award August 1968 for 
maintenance dredging in the entrance channel was 
terminated for convenience of the Government November 
1968, and was reawarded June 1969. The 
length of the basin protective berm was extended 100 
feet in fiscal year 1968 and an additional 600 feet in 
fiscal years 1969-70 by the integrity of the Federal 
project. 
7. KAKE HARBOR, ALASKA 
Location. In southeastern Alaska on the northwest 
corner of Kupreanof Island, 39 air-miles west of 
Petersburg and 850 water-miles northwesterly of 
Seattle, Washington. 
Existing project. Consists of a 1,580-foot west breakwater 
with a crest elevation of 22 feet above MLLW, 
and a 900-foot south breakwater with a crest elevation 
of 20 feet above MLLW. The resulting harbor would 
inclose 7 acres and provide access area for 150 boats. 
Local cooperation. Local interests are required to 
provide, without cost to the United States, all lands, 
easements, and rights-of-way required for construction 
1201

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
and maintenance of the project and for aids to 
navigation; hold and save the United States free from 
damages that may result from the construction and 
maintenance of the project; provide and maintain, 
without cost to the United States, necessary mooring 
facilities and utilities including a public landing with 
suitable supply facilities open to all on equal terms; 
accomplish, without cost to the United States, such 
utility or other relocations or alterations as necessary 
for project purposes; and establish regulations concerning 
discharge of untreated sewage, garbage, and 
other pollutants in the waters of the harbor by the users 
thereof, which regulations shall be in accordance with 
applicable laws or regulations of Federal, State, and 
local authorities responsible for pollution prevention 
and control. The city of Kake, as project sponsor, by 
resolution dated 30 September 1966, has indicated a 
willingness and ability to cooperate with all the 
conditions of local cooperation except water pollution. 
No problems are anticipated in securing agreement on 
the control of sewage, garbage, and other pollutants in 
the waters of the anchorage by users thereof. 
Terminal facilities. Consists of a State maintained 600- 
foot long wharf with a face depth of 10 feet MLLW and 
an 85-foot long gangway connecting the wharf with a 
seaplane float. 
Operations and results during fiscal year. No work 
performed on this project. 
Condition at end offiscalyear. Project not begun. 
8. KING COVE HARBOR, ALASKA 
Location. Near the southwesterly tip of the Ala ska 
Peninsula in southwestern Alaska, 450 miles northeast 
of Kodiak of 175 miles southwest of Dutch Harbor. 
Existing project. Provides for an entrance channel 125 
feet wide and about 950 feet long leading to an 11-acre 
anchorage basin and maneuvering area. Project harbor 
and channel depth will be 15 feet MLLW. 17,000 cubic 
yards of dredged earthfill would be placed as a training 
dike to divert tidal flows into the channel. The dike will 
be 800 feet long with a top elevation of 12 feet MLLW. 
A 200-foot long rock groin having a 10-foot MLLW top 
elevation would be located south of the entrance 
channel to divert littoral drift. The resulting harbor 
would increase commercial fishing boat capacity and 
would provide boat protection not locally available. 
Local cooperation. Local interest are required to 
provide, without cost to the United States, all lands, 
easements, and rights-of-way required for construction 
of the project and for construction and maintenance of 
aids to navigation, upon the request of the Chief of 
Engineers; hold and save the United States free from 
damages due to the construction works; provide and 
maintain at local expense adequate public terminal 
and transfer facilities open to all on equal terms in 
accordance with plans approved by the Chief of 
Engineers where appropriate; accomplish, without cost 
to the United States, such alterations as required for 
sewer, water supply, electricity, fire protection and 
other utility features; and establish regulations concerning 
discharge of untreated sewage, garbage, and 
other pollutants in the waters of the anchorage by users 
thereof, which regulations shall be in accordance with 
applicable laws or regulations of Federal, State, and 
local authorities responsible for pollution prevention 
and control. By resolution dated 23 September 1966, 
the city of King Cove agreed to cooperate with the 
United States government with all the conditions of 
local cooperation except water pollution. No problems 
are anticipated in securing agreement on the control of 
garbage and other pollutants in the waters of the 
anchorage of users thereof. 
Terminal facilities. Consist of privately owned twin 
wharves with a small basin between them. No 
commercial facilities exist. 
Operations and results during fiscal year. No work 
performed on this project. 
Condition at end offiscalyear. Project not begun. 
9. MYERS CHUCK HARBOR, ALASKA 
Location. In southeastern Alaska on the east shore of 
Clarence Strait, about 35 miles northwest of Ketchikan. 
(See U.S. Coast and Geodetic Survey Charts 
8102 and 8124.) 
Existing project. Provides for a rock-mound breakwater 
430 feet long between the mainland and a small 
unnamed island near the south end of the basin. Tidal 
range between mean lower low water and mean higher 
high water is 16.5 feet and extreme range is 26.5 feet. 
Cost estimate of new work (1970) is $158,000. (See 
table 40-B for authorizing legislation.) 
Local cooperation. State of Alaska has agreed to act as 
sponsor to provide, without cost the necessary lands, 
easements, rights-of-way, and quarry rights for construction 
and maintenance of these improvements. 
Terminal facilities. State of Alaska public float and 
private docks are adequate for existing commerce. 
Operations and results during fiscal year. Restudy of 
"inactive" project initiated in fiscal year 1968 was 
completed at a cost of $9,700. 
Condition at end of fiscal year. Project was classified 
"inactive" in 1955 and remained in this status until 
"deferred for restudy" reclassification was obtained 
September 1967. On 8 October 1970 the project was 
reclassified to the active category. 
10. NINILCHIK HARBOR, ALASKA 
Location. At mouth of Ninilchik River in Cook Inlet 
about 40 miles upcoast from Homer and 112 miles 
southwest of Anchorage. (See Coast and Geodetic 
Survey Chart 8554.) 
Existing project. A small boat basin 320 feet long by 
150 feet wide dredged to 2 feet deep above mean lower 
low water, with an approach channel 400 feet long and 
50 feet wide dredged to an elevation of 9 feet above 
mean lower low water, protected by a pile jetty 410 feet 
long, was completed in November 1961. During design 
stage, pile jetty was deleted and harbor dimensions 
modified to 120 feet wide and 400 feet long. Range 
1202

ALASKA DISTRICT 
between mean lower low water and mean higher high 
water is 19.1 feet, with an extreme range of 30 feet, 
based on preearthquake data. (See table 40-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. None available at Ninilchik, 
supplies are usually unloaded on beach. A cannery 
dock is available for unloading fish at favorable tide 
stages. Approach and floats in small boat basin 
installed by State in May 1964 were damaged beyond 
economical repair by ice. New floats were installed by 
State in June 1968. Facilities considered adequate for 
existing commerce. 
Operations and results during fiscal year. Regular funds, 
maintenance: The small boat basin was dredged to an 
elevation of 0 feet, including advance maintenance, 
October 1969 by removal of 11,138 cubic yards of 
material at a cost of $40,950. To prevent beach erosion 
and siltation in and adjacent to the basin the Ninilchik 
River was diverted by cutting through the existing 
beach access road and to provide a new channel, 
construction of a gravel fill diversion dike and 
installation of a gabion sill all at a cost of $24,650. This 
work was accomplished October and November 1969. 
A critical shoal area was removed from the southeast 
corner of the basin by emergency dredging June 1970 
at a cost of $14,460. Project sedimentation studies 
continued. 
Condition at end of fiscal year. Construction of the 
project was completed November 1961. Repair of the 
upstream sill and removal of shoal material from the 
basin to a revised width of 110 feet was completed 
October 1963. Emergency repair work consisting of 
realignment of the entrance channel and construction 
of a timber groin on the south side of the channel 
entrance was accomplished June 1966. The timber 
groin was destroyed by tidal action October 1966. 
Rehabilitation of the project included dredging of the 
boat basin to project depth, placement of slope 
protection, construction of two jetties at the entrance, 
diversion of the river from the basin and construction of 
a metal barrel beach protection. This work commenced 
in May and was completed in September 1967. Further 
maintenance dredging of the entrance channel was 
accomplished in May and June 1968 and emergency 
work consisting of realignment of the mouth of the 
Ninilchik River with necessary slope protection accomplished 
April 1969. The entrance channel was 
dredged to project depth May 1969. (See Section 20 for 
emergency protection work.) 
11. NOME HARBOR, ALASKA 
Location. At mouth of Snake River on northerly shore 
of Norton Sound, an arm of Bering Sea. It is a shallow, 
open roadstead, 581 nautical miles north of Dutch 
Harbor and 2,288 nautical miles northwest of Seattle, 
Was. (See Coast and Geodetic Survey Charts 9302 and 
9380.) 
Existing project. Provides for two jetties, the easterly 
951 feet long, and westerly not exceeding 676 feet long, 
at mouth of Snake River; a channel 8 feet deep at 
mean lower low water and 75 feet wide from Norton 
Sound through Snake River to mouths of Bourbon and 
Dry Creeks, in city of Nome, ending in a basin of 
similar depth 250 feet wide and 600 feet long, revetting 
banks of rivers; and protecting all existing waterfront 
improvements on easterly beach by means of rockmound 
seawall 3,350 feet long extending easterly from 
east jetty. Extreme tidal range is 7.5 feet and range 
between mean lower low water and mean higher'high 
water is 1.6 feet, but water levels are influenced more 
by wind than tide. Plane of reference is mean lower low 
water. Levels of 5 feet below mean lower low water 
have been observed during offshore winds, and a level 
of 14 feet above mean lower low water has been 
observed during a southerly storm. (See table 40-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. Total actual 
costs for all requirements of local cooperation under 
terms of original project authorization are $2,500 
annually. 
Terminal facilities. Cargoes and passengers from ocean 
vessels are lightered to and from shore a distance of 
about 2 miles. Traffic enters dredged channel and is 
handled over revetment, where transfer facilities that 
are open to public use have been installed by a 
lighterage company. Facilities considered adequate for 
existing commerce. 
Operations and results during fiscal year. Regular funds, 
maintenance: Government plant and hired labor 
dredged 15,980 cubic yards of material from the 
turning basin and entrance channel in July, August, 
and September 1969 and June 1970 at a cost of $80, 
977. Project sedimentation studies continued. Project 
condition survey was accomplished October 1969. 
Condition at end of fiscal year. Construction of original 
335- and 460-foot jetties and revetments was commenced 
in 1919 and completed in 1923. Reconstruction 
of jetties with concrete to modified lengths 
of 240 and 400 feet was completed in 1940. Dredging 
channel and original 200-by 250-foot basin was' 
commenced in 1919 and completed in 1922. Reconstruction 
of the jetties with concrete to modified 
lengths of 240 and 400 feet was completed in 1940. 
Construction of the seawall commenced in 1949 and 
was completed June 1951. Dredging of the 400 foot 
extension to the basin commenced in 1949 and is 
complete with exception of small areas in the northerly 
portion of the harbor extension and around the Corps 
marine ways which is not required. A portion of the 
east jetty was repaired in 1954 with a concrete fill and 
eroded portions on both jetties were repaired July 
through October 1965. Jetty extensions of 551 and 516 
feet to complete them to authorized project lengths are 
no longer required. Maintenance dredging of the 
turning basin and entrance channel by Government 
plant and hired labor is accomplished annually from 
June to October. Controlling depth is 8 feet in the 
channel and southern end of the turning basin and 4 
feet in the northern end of the turning basin. 
1203

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
12. SERGIUS--WHITESTONE NARROWS, 
ALASKA 
Location. 20 water-miles northwest of Sitka, 85 watermiles 
southwest of Juneau, in southeastern Alaska. 
Previous project. Removal of rock outcroppings to 
provide a channel 200 feet long and 24 feet deep at 
Whitestone Narrows. 
Existing Project. Sergius-Whitestone Narrows are 
hazardous constrictions in the protected navigational 
passage connecting Sitka to the rest of southeastern 
Alaska. The passage is used by fishing craft, cargo 
vessels, log raft tows, and the State of Alaska ferries 
carrying passengers and vehicles to and from Sitka. 
The project provides for rock removal in Whitestone 
Nar rows increasing the minimum width from 200 to 
300 feet and maintaining a depth of 24 feet; and 
provides for rock removal in Sergius Narrows creating 
a minimum width of 450 feet and depth of 24 feet. The 
plan would provide channels of sufficient width and 
depth to allow unrestricted all-tide passage by a 
majority of vessels. 
Local cooperation. The State of Alaska has agreed to 
hold and save the United States free from damages due 
to construction and maintenance of the improvements. 
Terminal facilities. The improvement forms a part of 
an existing trade route. There are no terminal facilities 
within the limits of the improvement. 
Operations and results during fiscal year. No work 
performed on this project. 
Condition at end offiscalyear. Project not begun. 
13. SITKA HARBOR, ALASKA 
Location. On Sitka Sound in southeastern Alaska on 
west shore of Baranof Island, about 806 miles northwest 
of Seattle and 158 miles westerly from Petersburg. 
(Coast and Geodetic Survey Charts 8002, 8244, 8252, 
and 8255.) 
Previous projects. For details see page 2069 of Annual 
Report for 1940 and page 2020 of Annual Report for 
1941. 
Existing project. A channel on easterly side of Harbor 
Rock, 150 feet wide and 22 feet deep at mean lower low 
water; removal of Indian Rock; improvement of 
Crescent Bay by dredging an area of about 13 acres 10 
feet deep below mean lower low water, and constructing 
protective breakwaters; and improvement of 
Forest Service basin by dredging a 130- by 270-foot 
area to 10 feet below mean lower low water. Tidal 
range between mean lower low water and mean higher 
high water is 9.9 feet. Extreme range is about 18 feet. 
(See table 40-B for authorizing legislation.) 
Local cooperation. City of Sitka agreed to meet all 
necessary requirements and will also provide bulkheads 
to retain spoil material. 
Terminal facilities. There are 13 piers, wharves, and 
floats in Sitka Harbor. Four privately owned and 
operated wharves are open for public use. City of Sitka 
owns three float systems which are open for public use 
for mooring and servicing small craft. Former Navy 
facilities are being used by Alaska Native Service. 
Remaining facilities are used for industrial purposes. 
Facilities are considered adequate. 
Operations and results during fiscal year. Regular funds, 
maintenance: On site studies of surging problems in the 
small boat basin continued and wave gauges were 
established at a cost of $10,000. 
Condition at end of fiscal year. Indian Rock and an 
isolated boulder were removed and channel was 
completed on easterly side of Harbor Rock in 1937. 
During design stage the basin area was enlarged to 15 
acres to accommodate expanded vessel activity, and 
the breakwater design was revised. Project depth was 
available in channel in May 1948. Construction of 
breakwater protecting Crescent Bay small boat basin 
and dredging of Forest Service Basin was initiated July 
30, 1964 and was completed December 24, 1965. 
Establishment of wage gauges were completed. 
14. SKAGWAY HARBOR, ALASKA 
Location. Skagway Harbor is in southeastern Alaska 
at the mouth of Skagway River, which flows into the 
head of Taiya Inlet (an arm of Lynn Canal) 1,100 
miles northwest of Seattle, Wash., and 94 miles 
northwest of Juneau, Alaska. (See U.S. Coast and 
Geodetic Survey Charts Nos. 8202 and 8303.) 
Previous projects. The original project, adopted by the 
River and Harbor Act of June 20, 1938 provided for a 
rock, brush, and earth training dike on the left bank of 
Skagway River, and a rubblemound breakwater across 
the tide flats in prolongation of the dike. Completed in 
1940, the dike and breakwater now form a part of the 
flood-control project for Skagway, Skagway River, 
Alaska, authorized by the Flood Control Act approved 
July 24, 1946. For further details, see pages 2451 and 
2499 of the Annual Report for 1946. 
Existing project. This provides for dredging at the face 
of the wharf to a depth of 30 feet at mean lower low 
water for the southerly 700 feet, and to a depth of 20 
feet to the next 100 feet; and for dredging a basin for 
small boats to a depth of 8 feet over an area of 1 acre 
near the north end of the wharf. The range between 
mean lower low water and mean higher high water is 
14.4 feet. The extreme range is about 27.7 feet. (See 
table 40-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There is one privately owned wharf 
open for public use as a passenger and general cargo 
terminal, a privately owned ore handling wharf, and a 
State owned ferry terminal. A barge terminal owned by 
the U.S. Government and formerly used in connection 
with military operations is also available. These 
facilities are considered adequate for existing commerce. 
Operations and results during fiscal year. Regular funds, 
maintenance: Dredging of the small boat basin to 
project depth was accomplished June 1970.4,100 cubic 
yards of material were removed at a cost of $22,700. 
1204

ALASKA DISTRICT 
Condition at end of fiscal year. Dredging work commenced 
in April 1959 and was completed in May 1959. 
Maintenance dredging of the small boat basin was 
performed during June 1970. 
15. STIKINE RIVER, ALASKA 
Location. Rises in northwestern Canada and flows 
southwesterly through Canada for about 200 miles, 
then about 30 miles westerly across Panhandle of 
Alaska to Sumner Strait. Mouthof river is on coast of 
mainland about 3 miles north of Wrangell. (See Coast 
and Geodetic Survey Chart 8201.) 
Existing project. Snagging Stikine River from its 
mouth about 30 miles to Canadian border. No data 
available concerning stages of high and low water in 
river. At mouth, tidal range between mean lower low 
water and mean higher high water is 13.9 feet, and 
maximum range is about 25 feet. Tidal effects have 
been reported at a distance of 20 miles from the mouth. 
(See table 40-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. None along Alaskan portion of 
river. Vessels operating on Stikine River are dependent 
on terminal facilities at Wrangell Harbor. Two 
privately owned wharves serving general cargo and 
passenger terminals, one of which includes a coldstorage 
facility, are open for public use for mooring and 
servicing small craft, and two privately owned floats 
serve oil-handling facilities. Small boat harbor facilities 
accommodate about 200 vessels. 
Operations and results during fiscal year. Clearing of 
potential snags along the river bank which was 
initiated in fiscal year 1968 continued until 6 July 1969 
at a cost of $1,820. Clearing of 26 additional acres of 
potential snags began 30 September 1969 and was 
completed 24 October 1969 at a cost of $8,411. 
Condition at end offiscalyear. Removal of snags from the 
river between its mouth and the Canadian border was 
accomplished as needed by contract under maintenance 
funds from 1938 to 1964 when annual snag 
removal was initiated. Removal of snags and clearing 
of trees on shore as potential snags was accomplished 
October 1967 through May 1968 and again in June, 
July, September, and October 1969. 
16. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See table 40 C. 
17. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to section 107, Public Law 
86--645 (Preauthorization) 
Fiscal year costs for preauthorization studies were 
$15,502 for Bethel Small Boat Harbor, Alaska. (See 
Section 2 for Bethel Harbor Project.) $3,520 for Orca 
Inlet, Cordova, Alaska. 
18. BEACH EROSION CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
Beach erosion control activities pursuant to Section 103, Public 
Law 874, 87th Congress (Preauthorization). 
Fiscal year costs for preauthorization studies were 
$1,008 for Pt. Barrow Beach Erosion, Alaska. 
FLOOD CONTROL 
19. CHENA RIVER LAKES, ALASKA. 
Location. In the vicinity of Fairbanks, Alaska, and 
encompassing the Tanana River, Chena River, Little 
Chena River, and their tributaries. (See USGS map 
Fairbanks Cl, Dl, D2, and Big Delta D6.) 
Existing project. Provides for a dam on the Chena 
River, 28 miles east of Fairbanks, creating a reservoir 
with 700,000 acre-feet of useable flood control storage; 
a dam on the Little Chena River about 11 miles 
upstream from i ts confluence with the main Chena 
River, which will provide a detention reservoir with 50, 
000 acre-feet of useable flood control storage; and a 27- 
mile levee system along the Tanana and Chena Rivers. 
Estimated Federal Cost (July 1970) is $137,000,000; 
estimated non-Federal cost (July 1970) is $1,860,000 
for rights-of-way, relocations and one-half of separable 
costs allocated to recreation and fish and wildlife 
enhancement. (See table 40-B for authorizing legislation.) 
Local cooperation. Local interests are required to 
administer project land and water areas for recreation 
and fish and wildlife enhancement; pay, contribute in 
kind, or repay with interest, one-half of the separable 
cost of the project allocated to recreation and fish and 
wildlife enhancement; bear all costs of operation, 
maintenance, and replacement of lands and facilities 
for recreation and fish and wildlife enhancement; hold 
and save the United States free from damages due to 
construction of the levees and drainage works; provide 
without cost to the United States, all lands, easements, 
and rights-of-way necessary for construction of the 
levee and interior drainage works; accomplish without 
cost to the United States, all necessary relocations of 
buildings, streets, and utilities as required for construction 
of the levee project; maintain and operate the 
levee system and interior drainage works after completion 
in accordance with regulations prescribed by 
the Secretary of the Army. The North Star Borough 
adopted a resolution dated 30 October 1967, indicating 
approval of the proposed work and expressing their 
intention to provide the necessary local cooperation. 
Operations and results during fiscal year. Regular funds, 
new work: Ground control work for aerial photography 
began April 1970 and aerial photography was made 
June 1970. Topographic maps are under preparation. 
Condition at end offiscalyear. Preconstruction planning 
work has been initiated. 
1205

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
20. KLUTINA RIVER, COPPER CENTER, 
ALASKA 
Location. On Richardson Highway 180 miles from 
Anchorage and 250 miles from Fairbanks, just upstream 
of the confluences of Klutina and Copper 
Rivers. 
Existing project. Proposed improvements consist of 4, 
400 lineal feet of levee along the north bank of the 
Klutina River. Flood protection will be provided for 
the developed area of Copper Center and for the 
northerly highway approach to the Klutina River 
bridge. (See table 40-B for authorizing legislation.) 
Local cooperation. 
a. Provide without cost to the United States all lands, 
easements, rights-of-way, utility relocations and alterations, 
and highway or highway bridge construction 
and alterations necessary for project construction. 
b. Hold and save the United States free from 
damages due to the construction works. 
c. Maintain and operate the project after completion 
without cost to the United States in accordance with 
regulations prescribed by the Secretary of the Army. 
d. Assume full responsibility for all project costs in 
excess of the Federal cost limitation of $1 million. 
Operations and results during fiscal year. Regular funds, 
new work: Plans and specifications of final design were 
completed and project was authorized. 
Condition at end of fiscal year. Project was authorized 
and construction funds were received. 
21. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspections are made of all projects in order to 
determine compliance of local interests with assurance 
given to the United States regarding maintenance. 
Fairbanks, Tanana River, and Chena Slough were 
inspected in September 1969, Gold Creek in July 1969 
and Talkeetna River in June 1970. 
22. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 40-D. 
23. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency flood control activities - repair, flood fighting, and 
rescue work (Public Law 99, 84th Congress, and antecedent 
legislation). 
Federal costs for fiscal year were $32,617 for advance 
preparation, $51,947 for emergency operations, $29, 
723 for disaster assistance administration, $3,532 for 
rehabilitation at Aniak, Alaska, and $25,000 for 
emergency work at Ninilchik, Alaska. 
Emergency bank protection (see 14, 1946 Flood Control Act, 
Public Law 526, 79th Congress). 
Emergency bank protection for Palmer, Alaska costs 
were $50,000. 
MULTIPLE-PURPOSE PROJECTS 
INCLUDING POWER 
24. TALKEENTA RIVER, ALASKA 
Location. At the town of Talkeetna near the confluence 
of the Talkeetna and Susitna Rivers, 80 miles 
north of Anchorage, Alaska. 
Previous project. Provided for stabilization of 1,500 feet 
of river bank of the Talkeetna River with a brush and 
natural timber fascine for a distance of 1,000 feet below 
the Alaska Railroad bridge as emergency bank 
protection for the town of Talkeetna. Construction 
began in March and was completed in May 1951 at a 
cost of $24,898 under authority of Section 14 of the 
Flood Control Act approved 24 July 1946. 
Existing project. Now inactive, consists of riprapping 1, 
500 feet of the river bank downstream from the railroad 
bridge to prevent further cutting of the east bank north 
of the town of Talkeetna, Alaska, under the authority 
of the Rivers and Harbors Act of 1958. 
Local cooperation. If the project is activated, the State 
of Alaska will be required to provide without cost to the 
United States, all lands, easements, and rights-of-way 
necessary for the construction of the project; agree to 
hold and save the United States free from damages due 
to the construction work; agree to maintain the works 
after completion in accordance with Federal regulations. 
Terminal facilities. There are no commercial facilities 
because Talkeetna River is not navigable to commercial 
vessels. 
Operations and results during fiscal year. No work 
performed on this project. 
Condition at end of fiscal year. Project not begun. 
25. SNETTISHAM, ALASKA 
Location. At mouth of Speel River, between Crater 
Lake to the west and Long Lake to the north, 28 
nautical miles southeast of Juneau, Alaska. (See Coast 
and Geodetic Survey Chart 8227.) 
Existing project. Snettisham will be constructed in two 
stages. First stage, or Long Lake Phase, will provide for 
46,700 kilowatts of power. As additional power 
generation becomes necessary, the second stage, or 
Crater Lake Phase, will be constructed, which will 
provide an additional 23,350 kilowatts of power. The 
development provides for concrete gravity dam at the 
outlet of Long Lake to raise lake level 80 feet and 
drilling two tunnels, one 8,400 feet long to tap Long 
Lake, and one 6,000 feet long to tap Crater Lake. 
Separate penstock tunnels 1,400 and 1,540 feet long 
will be drilled from respective power tunnels to convey 
water to a 70,050 kilowatt powerplant. Tunnel intakes, 
gate shafts, trashracks, and surge underground tanks 
1206

ALASKA DISTRICT 
are included in waterway construction. Power will be 
transmitted along an overhead transmission route from 
the powerplant switchyard by 138 kilovolt lines to a 
substation near Juneau, Alaska. Estimated Federal cost 
of construction (1970) is $79,300,000. (See table 40-B 
for authorizing legislation.) 
Local cooperation. None required. 
Operations and results during fiscal year. Regular funds, 
new work: Work was completed in August 1969 on the 
access and construction facilities contract, awarded 
June 1967, contract amount $7,119,854. Work is 
progressing satisfactorily with some items delivered and 
is on schedule for turbine supply contract, awarded 
May 1968, contract amount $567,964. Supply contracts 
for two 23,350 KW generators and a 75-ton 
bridge crane were awarded in May 1970 in amounts of 
$1,184,025 and $105,300 respectively. The main 
construction contract was awarded in May 1970 for 
$19,844,730 to excavate all underground waterways, 
access tunnels, and powerhouse. Bids were opened for 
right-of-way clearing along the overhead transmission 
route and for 13.8 KV powerhouse switchgear equipment 
in June 1970. Design work for miscellaneous 
feature design memoranda, plans and specifications for 
powerhouse electrical and mechanical equipment 
supply contracts were completed. 
Condition at end of fiscal year. All design memoranda 
substantially complete. Plans and specifications have 
been completed for all major phases of work. Miscellaneous 
supply contract documents have been 
finalized. Access and Construction Facilities was 
completed August 1969. 
26. BRADLEY LAKE, ALASKA 
Location. Near head of Kachemak Bay near southwestern 
end of Kenai Peninsula, Alaska, about 100 air 
miles south of Anchorage and 25 miles northeast of 
Homer. (See U.S. Coast and Geodetic Chart No. 8552.) 
Existing project. Provides for a main dam raising 
waters of Bradley Lake from an elevation of 1,090 feet 
to elevation 1,196; two small dams to divert water from 
nearby drainages; a power tunnel, surge tank and 
penstock to deliver water to a powerhouse located at 
tidewater with an installed capacity of 64,000 kilowatts 
and transmission facilities to serve the Cook Inlet area. 
Latest cost estimate for new work, revised in 1970, is 
$84,200,000. (See table 40-B for authorizing legislation.) 
Local cooperation. None required. 
Operations and results during fiscal year. Regular funds, 
Advance Engineering and Design: Reappraisal of the 
economic and financial feasibility was initiated in 
September 1968 and is underway. 
Condition at end of fiscal year. Continuation of planning 
contingent on results of reappraisal study now underway. 
GENERAL INVESTIGATIONS 
27. SURVEYS 
Fiscal year cost of $275,141 for surveys include $220, 
153 for navigation studies, $35,000 for flood control 
studies, $4,974 for special studies, and $15,014 for 
coordination studies. 
28. COLLECTION AND STUDY OF BASIC 
DATA 
Technical assistance, information, flood plan management 
guidance, and other flood plain management 
services have been provided to military and nonmilitary 
Federal agencies, State and local government 
agencies, and others at a fiscal year cost of $96,000. The 
Flood Plain Information reports for Mendenhall River 
and Lemon Creek areas, near Juneau, were completed 
and will be presented early in FY 71. Fiscal year total 
cost was $67,000 and includes $34,500 for Mendenhall 
River, Juneau, Alaska, and $32,500 for Lemon Creek, 
Juneau, Alaska. 
Additional activities included the preparation of 
Flood Insurance Studies for Housing and Urban 
Development in the Bethel area and seven type seven 
studies in various areas of the State. Fiscal year 
reimbursable cost was $30,520. 
29. RESEARCH AND DEVELOPMENT 
Work programmed for research and development 
consists of storm studies and other hydrologic studies. 
Fiscal year costs of these studies were $21,979. 
1207

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 40-A COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
1. Anchorage Harbor, New Work: 
Alaska Approp. $ 159,000 $ - $ -95,765 $ - $ 533,235 
2. Bethel Harbor, 
Alaska 
3. Cordova Harbor, 
Alaska 
4. Dillingham Harbor, 
Alaska 
5. Egegik River, 
Alaska 
6. Homer Harbor, 
Alaska 
9. Myers Chuck Harbor, 
Alaska 
10. Ninilchik Harbor, 
Alaska 
11. Nome Harbor, 
Alaska (Federal 
Funds) 
(Contrib. Funds) 
Cost 
Maint.:1 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.:1 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.:1 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 1 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
Maint.: 
Contrib. 
Cost 
570,636 
50,000 
104,057 
139,000 
3,696 
15,834 
9,988 
14,267 
-9,000 
11,826 
4,061 
4,061 
4,683 
201,000 
45,935 
105,227 
41,015 
101,700 
118,953 
2,500 
2,500 
-38 
16,930 
16,930 
8,640 
-44,725 
90,579 
10,074 
44,377 
44,377 
7,475 
7,356 
25,000 
180,065 
40,941 
106,516 
78,700 
84,359 
- rn 
2,500 
2,500 
-95,263 
475,731 
248,955 
63,698 
58,434 
3,360 
4,254 
206,000 
174,992 
111,700 
45,997 
9,700 
9,650 
146,000 
81,176 
115,000 
120,767 
- in 
2,500 
2,500 
251,672 
446,923 
20,500 
22,363 
56,045 
56,045 
117 
141,792 
177,162 
1,407 
1,407 
14,637 
80,458 
50 
82,861 
144,575 
101,122 
99,165 
2,500 
2,500 
533,235 
852,220 
812,911 
84,198 
80,797 
843,534 
843,534 
367,617 
367,617 
675,700 
673,181 
548,790 
548,790 
454,577 
453,938 
4,441 
4,441 
1,819 
1,819 
1,509,677 
1,509,677 
535,856 
535,856 
67,974 
67,974 
9,700 
9,700 
428,720 
428,720 
489,142 
480,447 
1,348,240 
1,348,240 
2,426,487 
1,424,530 
125 
125 
120,000 
120,000 
1208

TABLE 40-A (Cont'd) 
ALASKA DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
13. Sitka Harbor, New Work: 
Alaska Approp. $ -9,000 $ - $ - $ - $ 1,465,944 
Cost 70,237 8,345 7,636 6,633 1,465,944 
Maint.: 
Approp. - - - 12,574 17,180 
Cost - - - 12,238 16,844 
14. Skagway Harbor, New Work: 
Alaska Approp. - - - - 133,180 
Cost - - - - 133,180 
Maint.: 
Approp. - - - 32,665 66,879 
Cost - - - 32,665 66,879 
15. Stikine River, Maint.: 
Alaska Approp. 10,000 10,000 10,000 10,701 61,176 
Cost 5,767 14,949 7,989 12,712 61,176 
19. Chena River Lakes, New Work: 
Alaska Approp. - - - 176,000 176,000 
Cost - - - 176,000 176,000 
20. Klutina River, New Work: 
Copper Center, Approp. - 20,000 16,000 230,000 290,693 
Alaska Cost 14,860 1,357 31,553 5,030 62,513 
25. Snettisham, New Work: 
Alaska Approp. 750,000 5,405,000 4,700,000 5,350,000 18,410,000 
Cost 669,189 5,559,211 3,203,166 3,574,811 15,082,239 
26. Bradley Lake, New Work: 
Alaska Approp. - - 49,000 100,000 149,000 
Cost - - 46,857 82,372 129,229 
1. Includes applicable portion of Reconnaissance and 
Condition Surveys appropriations and costs. 
1209

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 3, 1958 
July 14, 1960, as 
amended (Sec. 
107)3 
Aug. 30, 1935 
Aug. 19, 19644 
July 3, 1958 
Aug. 30, 1935 
July 3, 1958 
Aug. 13, 1968 
Aug. 13, 1968 
Mar. 2, 1945 
July 3, 1958 
Aug. 8, 1917 
Aug. 30, 1935 
June 16, 1948 
Aug. 13, 1968 
ANCHORAGE HARBOR, ALASKA (See Section 1 of Text) 
Deep water harbor, adjacent to docks, dredge to 35 feet below 
mean lower low water, protected by two jetties.1 
BETHEL SMALL BOAT HARBOR, ALASKA (See Section 2 of Text) 
Construct 7,700-foot-long small-boat harbor and entrance 
channel by deepening, widening, and straightening the upper 
6,800 feet of Brown's Slough. 
H. Doc. 34, 85th Cong., 1st 
sess.2 
Report in Office, Chief of 
Engineers. 
CORDOVA HARBOR, ALASKA (See Section 3 of Text) 
Basin 8.26 acres in area with depth of 10 feet below mean Rivers and Harbors Committee 
lower low water, and two rock-mound breakwaters, 1,100 and Doc. 33, 73d Cong., 2d sess.2 
1,400 feet long. 
Expand basin within existing breakwater. 
DILLINGHAM HARBOR, ALASKA (See Section 4 of Text) 
Basin 230,000 square feet in area with a depth of 2 feet above H. Doc. 390, 84th Cong., 2d 
mean lower low water along Scandinavian Creek, with entrance sess. 2 
channel 1,100 feet long and 40 feet wide. 
EGEGIK RIVER, ALASKA (See Section 5 of Text) 
Channel 100 feet wide, 5 feet deep, and 2,500 feet long H. Doc. 51, 73d Cong., 1st 
through rapids at head of the river. sess. 2 
HOMER HARBOR, ALASKA (See Section 6 of Text) 
Basin 2.7 acres in area with depth of 12 feet below mean lower H. Doc. 34, 85th Cong., 1st 
low water, and rock breakwater 1,260 feet long. sess. 2 
KAKE HARBOR, ALASKA (See Section 7 of Text) 
Basin, 7-acre berthing area, 15 feet deep, inclosed by a S. Doc. 70, 90th Cong., 2d 
1,580-foot west rock breakwater and a 900-foot south rock sess. 2 
breakwater. 
KING COVE HARBOR, ALASKA (See Section 8 of Text) 
Anchorage basin of 11 acres, 15 feet deep; an entrance S. Doc. 13, 90th Cong., 2d 
channel 125 feet wide and 15 feet deep; an earthfill sess. 2 
training dike; and a rockfill groin. 
MYERS CHUCK HARBOR, ALASKA (See Section 9 of Text) 
Rock-mound breakwater 430 feet long between mainland and a H. Doc. 222, 76th Cong., 1st 
small island. sess. 2 
NINILCHIK HARBOR, ALASKA (See Section 10 of Text) 
Basin 320 feet long by 150 feet wide with depth of 2 feet H. Doc. 34, 85th Cong., 1st 
above mean lower low water, approach channel 400 feet long sess. 2 
and 50 feet wide with depth of 9 feet above mean lower low 
water, protected by 410-foot jetty. 
NOME HARBOR, ALASKA (See Section 11 of Text) 
Two jetties, easterly 335 feet and westerly 460 feet long, H. Doc. 1932, 64th Cong., 2d 
revetment, channel and basin 200 feet wide and 250 feet long. sess. 
Extension of the jetties and basin.5 H. Doc. 404, 71st Cong., 2d 
sess., and Rivers and Harbors 
Committee Doc. 38, 73d Cong., 
2d sess.2 
Sea wall. Report of Chief of Engineers 
dated March 8, 1948. 
SERGIUS AND WHITESTONE NARROWS, ALASKA (See Section 12 of Text) 
Channel 24 feet deep and 450 feet wide through Sergius S. Doc. 95, 90th Cong., 2d 
Narrows, and channel 24 feet deep and 300 feet wide through sess. 2 
Whitestone Narrows. 
1210 
TABLE 40-B

ALASKA DISTRICT 
TABLE 40-B (Cont'd) 
Acts 
AUTHORIZING LEGISLATION 
Work Authorized 
Aug. 30, 1935 
Mar. 2, 1945 
Sept. 3, 1954 
Mar. 2, 1945 
Aug. 30, 1935 
Aug. 13, 1968 
June 30, 2958, as 
amended (Sec. 
205)6 
July 3, 1958 
Oct. 23, 1962 
Oct. 23, 1962 
SITKA HARBOR, ALASKA (See Section 13 of Text) 
Channel on easterly side of Harbor Rock, and removal of Indian 
Rock. 
Improvement of Crescent Bay. 
Improvement of Forest Service Basin. 
SKAGWAY HARBOR, ALASKA (See Section 14 of Text) 
Dredge adjacent to wharf to depth of 30 feet at mean lower 
low water for the southerly 700 feet, and to depth of 20 
feet for next 100 feet, and basin to depth of 8 feet. 
STIKINE RIVER, ALASKA (See Section 15 of Text) 
Snagging from mouth to Canadian border. 
CHENA RIVER LAKES, ALASKA (See Section 19 of Text) 
Dam and reservoir on the main Chena River, a dam and detention 
reservoir on the Little Chena River, and a levee along the 
north side of the Tanana River. 
KLUTINA RIVER, COPPER CENTER, ALASKA (See Section 20 of Text) 
Levee 4,400 feet long on north bank of Klutina River. 
TALKEETNA RIVER, ALASKA (See Section 24 of Text) 
Riprapping 1,500 feet of riverbank downstream from railroad 
bridge. 
SNETTISHAM, ALASKA (See Section 25 of Text) 
Multi-purpose dam, with powerhouse and transmission facilities. 
BRADLEY LAKE, ALASKA (See Section 26 of Text) 
Multi-purpose dam, with powerhouse and transmission facilities. 
Rivers and Harbors Committee 
Doc. 59, 74th Cong., 1st 
sess. 
H. Doc. 744, 79th Cong., 2d 
sess. 
H. Doc. 414, 83d Cong., 2d 
sess. 2 
H. Doc. 746, 79th Cong., 2d 
sess. 
2 
H. Doc. 210, 72d Cong., 1st 
sess.2 
H. Doc. 148, 90th Cong., 2d 
sess. 
Report in Office, Chief of 
Engineers. 
H. Doc. 34, 85th Cong. 
H. Doc. 40, 87th Cong., 1st 
sess. 
H. Doc. 455, 87th Cong., 2d 
sess.2 
1. Jetties deferred. 
2. Contains latest published map. 
3. Authorized by Chief of Engineers December 30, 1969. 
4. P.L. 88-451. 
5. Extension of jetties classified 'inactive.' 
6. Authorized by Chief of Engineers June 12, 1968. 
1211 
Documents

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 40-C OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 16 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 1 
Apoon Mouth of Yukon River, Alaska2 '3 1920 $ 128,896 $ 2,981 
Craig Harbor, Alaska2 1958 377,260 7,523 
Douglas Harbor, Alaska2 1963 282,019 7,861 
Dry Pass, Alaska2 1960 943,351 23,011 
Elfin Cove, Alaska2 1959 154,191 11,733 
Gastineau Channel, Alaska2 1964 789,461 122,508 
Iliuliuk Harbor, Alaska 1941 66,037 
Juneau Harbor, Alaska 1969 1,381,150 183,053 
Ketchikan Harbor, Alaska2 1965 1,602,417 181,141 
Kodiak Harbor, Alaska2 1968 1,886,5184 8,116 
Metlakatla Harbor, Alaska2 1956 286,4705 5,963 
Naknek River, Alaska2 1961 20,789 4,069 
Neva Strait, Alaska2 1960 155,009 6,352 
Old Harbor, Kodiak Island, Alaska2 1968 370,415 
Pelican Harbor, Alaska2 1964 369,683 21,867 
Petersburg Harbor, Alaska2 1969 252,932 50,134 
Port Alexander, Alaska 2 ,6 1949 17,000 594 
Rocky Pass, Alaska2 1960 337,668 17,983 
St. Michael Canal, Alaska 2 , 3 1916 377,062 560 
Seldovia Harbor, Alaska2 1968 1,043,6777 11,498 
Seward Harbor, Alaska2 1966 709,8418 204,780 
Valdez Harbor, Alaska 1968 647,0279 226,958 
Wrangell Harbor, Alaska2 1969 537,020 112,027 
Wrangell Narrows, Alaska 1963 3,562,343 293,199 
1. Includes applicable portion of reconnaissance and 
condition survey costs. 
2. Complete. 
3. Abandonment recommended in H. Doc. 467, 79th Cong., 
1st Sess. 
4. Includes $589,469 for rehabilitation. 
5. Excludes $40,000 expended from contributed funds. 
6. Inactive. 
7. Includes $391,794 for rehabilitation. 
8. Includes $90,026 for rehabilitation. 
9. Includes $73,000 for rehabilitation. 
1212

ALASKA DISTRICT 
TABLE 40-D OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 22 of Text) 
For Last Cost to June 30, 1970 
Full Report 
See Annual Operation & 
Project Report for Construction Maintenance 
Fairbanks, AlaskaI 1964 $ 310,000 $ - 
Fairbanks, Tanana River and Chena Slough, 
Alaska2 1943 557,000 - 
Gold Creek, Alaska2 1968 688,604 - 
Lowell Creek, Alaska2 1945 416,3824 30,7713,s 
Salmon River, Alaska2 1963 37,7706,7 - 3,8,9 
Skagway River, Alaska2 1966 26,385 - 
1. Reauthorized, see Section 19, Chena River Lakes. 
2. Completed and transferred to local interests for 
maintenance. 
3. Previous inspections costs included in Section 21. 
4. In addition, $25,000 expended from contributed funds. 
5. In addition, $12,000 expended from contributed funds. 
6. In addition, $7,000 expended from contributed funds. 
7. Includes $34,197 of PWA funds. 
8. In addition, $162,925 expended for emergency flood 
activities (1963). 
9. In addition, $27,400 expended from contributed funds. 
1213 
451-584 0-72-77

BOARD OF ENGINEERS FOR RIVERS AND HARBORS* 
The Board of Engineers for Rivers and Harbors is a 
continuing body created by section 3, 1902 River and 
Harbor Act. The Board comprises 7 senior engineer 
officers. Normally the Chairman is the Deputy Chief of 
Engineers. Five members are Division Engineers 
(rotative basis) from continental U.S. divisions. The 
seventh officer is assigned full time as Resident 
Member and directs the staff. Appointments are made 
by the Chief of Engineers for unspecified periods. The 
Board meets on call of the Chairman. 
Statutory duties of the Board as set forth in the act of 
June 13, 1902, and subsequent acts and amendments 
are: (a) to conduct an independent review of survey 
reports covering projects for river and harbor, flood 
control, and multiple-purpose improvements prepared 
by the Corps in response to an act of the Congress or a 
resolution of the House or Senate Public Works 
Committees, and to report its conclusions and recommendations 
thereon to the Chief of Engineers, who 
forwards the reports with his conclusions and recommendations 
to the Secretary of the Army for 
transmission to the Congress; (b) to conduct an 
independent review of special reports ordered by the 
Congress and report thereon in the same manner as for 
survey reports when directed by the Chief of Engineers; 
(c) to consider and approve general plans for major 
modification and reconstruction of any lock, canal, 
canalized river or other work for the use of benefit of 
navigation. The functions of the former Beach Erosion 
Board pertaining to review of reports concerning 
erosion of the shores of coastal and lake waters, and the 
protection of such shores, were transferred to the Board 
under section 3, Public Law 88-172. 
An additional statutory duty was assigned the Board 
under the terms of the Merchant Marine Act of June 5, 
1920. Under this act, the Board, in cooperation with 
the Maritime Administration, collects, compiles, and 
publishes information on characteristics of U. S. ports. 
Physical characteristics of the ports are the responsibility 
of the Corps, and administrative characteristics 
are the responsibility of the Maritime 
Administration. 
In addition to its statutory duties, the following 
duties are the more significant among those assigned by 
the Chief of Engineers: review Corps policies and 
procedures as directed; review reports of other Federal 
agencies pertaining to water resources development; 
conduct investigations and studies of economics of ports 
and waterways; and conduct a year-long program of 
in-service training for planners at GS-12 and GS-13 
levels in all aspects of Federal water resources 
development to assist in meeting the needs of the Corps 
for increased numbers of qualified personnel in this 
field. Also, the Resident Member is alternate for the 
Secretary of the Army on the Foreign-Trade Zones 
Board, first alternate for the Chief of Engineers on the 
National Capital Planning Commission, and ex-officio 
secretary of the American Section, Permanent International 
Association of Navigation Congresses, a 
quasi-official organization. (See separate section on 
PIANC). 
On June 30, 1970, the Board was composed of the 
following members: Maj. Gen. C. H. Dunn, Deputy 
Chief of Engineers, Chairman; Maj. Gen. Richard H. 
Free, Division Engineer, U. S. Army Engineer Division, 
South Atlantic; Maj. Gen. Charles M. Duke, 
Division Engineer, U. S. Army Engineer Division, 
North Atlantic; Maj. Gen. A. P. Rollins, Jr., Division 
Engineer, U. S. Army Engineer Division, Lower 
Mississippi Valley; Maj. Gen Willard Roper, Division 
Engineer, U. S. Army Engineer Division, Ohio River; 
Brig. Gen. Roy S. Kelley, Division Engineer, U. S. 
Army Engineer Division, North Pacific; and Col. Alvin 
D. Wilder, Resident Member. In addition to the 
foregoing, the following officers were also assigned for 
various periods during the year to membership on the 
Board: Maj. Gen. Robert G. MacDonnell, President, 
Mississippi River Commission, Vicksburg, Mississippi; 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
1215

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Maj. Gen. Frederick J. Clarke, Deputy Chief of 
Engineers, Washington, D. C.; Maj. Gen. Thomas J. 
Hayes, III' Division Engineer, U. S. Army Engineer 
Division, South Atlantic; Brig. Gen. C. Craig Cannon, 
U. S. Army Engineer Division, Missouri River; Brig. 
Gen. William M. Glasgow, Jr., Division Engineer, U. 
S. Army Engineer Division, South Pacific; Brig. Gen. 
Robert M. Tarbox, Division Engineer, U. S. Army 
Engineer Division, North Central; Lieut. Gen. William 
F. Cassidy was named Chairman of the Board 
from November 1, 1969 to his retirement on May 31, 
1970. 
A summary of investigations authorized by the 
Congress from establishment of the Board in 1902 to 
the end of fiscal year 1970, the number of authorizations 
completed, the number of authorizations 
remaining to be reported on, and the number of reports 
submitted under continuing authorizations are set 
forth in table 41-A under Board of Engineers for Rivers 
and Harbors. 
From 1902 through June 30, 1970, the Board took 
final action on 8,018 reports, recommending favorably 
on 3,557. By Public Law 85-500, Congress eliminated 
preliminary examinations. During fiscal year 1970, the 
Board held six meetings of 1 to 3 days' duration in 
Washington. Two public hearings were held, one on 
Snoqualmie River, North Bend, Washington, and the 
other on Sabine River, Longview, Texas. The Board 
considered 81 reports, acted favorably on 31, unfavorably 
on 25, deferred action on 15, and returned 7, 
reporting offices withdrew 3. The Board recommended 
construction of projects totaling $507,621,300 of which 
$449,177,800 was the estimated U. S. cost and $58,443, 
500 the cost to local interests for work and cash 
contributions. Of the 25 unfavorable reports acted on 
by the Board, 1 involved construction costs estimated at 
$9,384,000 consisting of $9,364,000 Federal, and $20, 
000 non-Federal. The remaining 24 reports contained 
no cost estimates as they dealt with improvements that 
were obviously unfavorable or no longer necessary. The 
Board's staff submitted reports or comments on reports 
as follows: 4 Department of Interior report reviews; 31 
Report reviews on small projects (prepared under 
continuing authorities); 3 Special reports on civil works 
planning; 20 Report reviews (preliminary reviews with 
special purposes in mind); and 2 Miscellaneous reports 
(Mekong Delta report and Corps presentation to 
American Petroleum Institute). 
Studies prescribed by various River and Harbor Acts 
and Section 8, Merchant Marine Act of 1920, 
continued, and the results were published in the series 
of reports titled "Port Series" (See Table 41-B). 
1216

TABLE 41-A 
BOARD OF ENGINEERS FOR RIVERS AND HARBORS 
BOARD OF ENGINEERS FOR RIVERS AND HARBORS 
Reports Submitted 
During Fiscal Year 
Authorities Authorities Authorities Authorities Authorities 1970 (Under Con- 
Received Received Completed Completed Remaining tinuing, Multiple 
Authority for Prior to During Prior to During to be and Special 
Investigation July 1, 1969 Fiscal Year July 1, 1969 Fiscal Year Reported on Authority) 
Flood Control and River and 
Harbor Acts, Exclusive of 1909 
River and Harbor Act 5,180 0 4,851 20 309 
River and Harbor Act of 1909- 
Continuing Authority for 
Major Modification 1 - - - 1 
Congressional Resolutions 
Exclusive of Great Lakes 
Harbors 4,394 80 3,084 47 1,343 
Congressional Resolutions 
Multiple Great Lakes Harbors 
Studies 2 0 2 0 - 0 
PL 71-84-1 Authority for 
Multiple Hurricane Studies 1 - - - 1 1 
River and Harbor Act, July 3, 
1930 (PL 520-71), Cooperative 
Beach Erosion Studies 1 - - - 1 2 
Total 9,579 80 7,937 67 1,655 3 
TABLE 41-B PORTS SERIES PUBLICATIONS 
Published during the year: 
No. 15, The Port of Jacksonville, Florida 
No. 19, The Ports of Panama City and Pensacola, Florida; and Pascagoula, Mississippi 
No. 21, The Ports of Baton Rouge and Lake Charles, Louisiana 
No. 23, The Ports of Galveston and Texas City, Texas 
No. 25, The Port of Corpus Christi, Texas 
In progress at end of year: 
No. 11, The Port of Hampton Roads, Virginia 
No. 18, The Port of Mobile, Alabama 
No. 20, The Port of New Orleans, Louisiana 
No. 22, The Ports of Port Arthur, Beaumont, and Orange, Texas 
No. 24, The Port of Houston, Texas 
No. 26, The Ports of Freeport, Port Isabel, and Brownsville, Texas 
No. 50, The Ports of Honolulu, Nawiliwili, Port Allen, Kahului, Hilo, and Kawaihae, Hawaii 
1217

MISSISSIPPI RIVER COMMISSION* 
The Mississippi River Commission, created by an 
act of Congress on June 28, 1879, consists of three 
officers of the Corps of Engineers, one from the Coast 
and Geodetic Survey, and three civilians, two of whom 
must be civil engineers. All members are appointed by 
the President with the advice and consent of the 
Senate. During the fiscal year the Commissioners were: 
Maj. Gen. Robert G. MacDonnell, U. S. Army, 
president, until his retirement July 31, 1969; Maj. Gen. 
Andrew P. Rollins, Jr., U. S. Army, president, effective 
August 11, 1969; Mr. Harold T. Council; Dr. Frederic 
H. Kellogg, civil engineer; Brig. Gen. C. Craig 
Cannon, U. S. Army, until his retirement November 
30, 1969; Maj. Gen. C. C. Haug, U. S. Army, until his 
retirement July 31, 1969; Mr. Roy T. Sessums, civil 
engineer; Rear Adm. Don A. Jones, director, U. S. 
Coast and Geodetic Survey, U. S. Environmental 
Science Services Administration; Maj. Gen. Willard 
Roper, U. S. Army, since July 16, 1969; and Brig. Gen. 
Harold R. Parfitt, U. S. Army, since May 11, 1970. 
Col. Paul R. Sheffield, U. S. Army, served as secretary 
of the Commission in the office of its president, 
Mississippi River Commission Building, Vicksburg, 
Miss., until his retirement June 30, 1970. The 
Mississippi River Commission is charged, under 
direction of the Secretary of the Army and supervision 
of the Chief of Engineers, with prosecution of improvements 
for flood control of the Mississippi River 
and of its tributaries and outlets in its alluvial valley, so 
far as they are affected by Mississippi River backwater, 
between Head of Passes, La. (mile 0), and Cape 
Girardeau, Mo. (1,006 miles AHP-lower Mississippi 
mileage terminates at mile 954 AHP), and with 
prosecution of improvements in the interest of navigation 
between Cairo, Ill. (954 miles AHP), and Baton 
Rouge, La. (234 AHP); and for stabilization of the 
lower seven miles of the right bank of the Ohio River, 
to former mouth of Cache River. It also is charged with 
prosecution of certain flood control works on the 
Mississippi River and tributaries as far as they are 
affected by backwater, between Cape Girardeau and 
Rock Island, Ill. (1,437 miles AHP), and with 
prosecution of improvements on designated tributaries 
and outlets below Cape Girardeau for flood control, 
major drainage, and related water uses such as 
navigation and water supply for agricultural use. 
Authorized operations of the Commission below Cape 
Girardeau are conducted by district engineers at New 
Orleans, Vicksburg, and Memphis Districts within the 
areas described below, in accordance with approved 
directives and programs and congressional appropriations 
therefor. F *Authorizing legislation 
(Table 42-D) and cost and financial statement (Table 
42-U) are listed at the end of this chapter. All other 
tables are referenced in text and also appear at the end 
of this chapter. 
New Orleans District: Mississippi River project 
levees and river channel stabilization as required from 
Head of Passes, mile 0 to 326 AHP, including south 
bank levee of Red River to Hotwells, La.; construction 
of four salinity control structures for fish and wildlife 
enhancement in lower Mississippi River Delta region; 
Bonnet Carre and Morganza Floodways; maintenance 
and improvements of Mississippi River navigation 
channel from Baton Rouge, La. (mile 234 AHP), to 
mile 326; Baton Rouge Harbor (Devils Swamp); 
navigation improvement of Atchafalaya and Old 
Rivers from Mississippi River to Morgan City; control 
of Old and Atchafalaya Rivers; Lake Pontchartrain 
protection levee, Jefferson Parish, La.; Atchafalaya 
Basin Floodways; flood control and drainage improvements 
in Bayou Cocodrie and tributaries, and in 
Bayou des Glaises, and upper Pointe Coupee Loop 
Area; and fresh water distribution from Atchafalaya 
River to Teche-Vermilion Basins. 
Vicksburg District: Mississippi River project levees 
and river channel stabilization as required from upper 
* All cost and financial statements for projects are listed at the 
appear at the end of this chapter. 
limits of New Orleans District (mile 326 AHP) in 
vicinity of Black Hawk, La., to Coahoma-Bolivar 
County line, Miss. (mile 620 AHP) on left bank, and to 
vicinity of mouth of White River, Ark. (mile 599 AHP) 
on right bank including south bank Arkansas River 
levee to vicinity of Pine Bluff, Ark., and north bank 
levee to vicinity of Tucker on left bank of Plum Bayou, 
Ark.; bank stabilization in lower 40 miles of Arkansas 
River; maintenance and improvement of Mississippi 
River navigation channel between miles 326 and 599 
AHP; Vicksburg and Greenville Harbors; specific fish 
and wildlife facilities in Yazoo and Big Sunflower 
Basins; flood control and drainage improvements in 
Red River backwater area including leveed portion 
east and west of Black River within district limits; 
Jonesville, La., Boeuf and Tensas Rivers and Bayou 
Macon Basins, and tributaries, Ark. and La., and 
Bayou Lafourche, La.; Yazoo River Basin, Miss., 
including backwater area; Big and Little Sunflower 
Rivers, Deer Creek, and Steele Bayou, Miss.; and 
Grand Prairie Region and Bayou Meto Basin, Ark., 
including provision for agricultural water supply. 
end of this chapter. All other tables are referenced in text and also 
1219,

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Memphis District: Mississippi River project levees 
and river channel stabilization as required, from upper 
limits of Vicksburg District to north bank of Little 
River diversion channel, Mo. (1,003 miles AHP), a few 
miles below Cape Girardeau, Mo., on right bank, and 
to Cache River diversion channel (967 miles AHP) 
above Cairo, Ill., on left bank, including levees and 
revetment on right bank of Ohio River, in Mounds- 
Mound City area, Ill.; except operations above Cairo, 
Ill., do not include channel stabilization on the 
Mississippi River. Maintenance and improvement of 
Mississippi River navigation channel between miles 
599 and 954 AHP and of Memphis Harbor, Tenn.; 
specific fish and wildlife facilities in St. Francis Basin; 
levees in White River backwater area up to vicinity of 
Augusta, Ark., and a pumping plant near mouth of 
White River; levees and pumping plants at De Valls 
Bluff and Des Arc, Ark.; channel improvements in 
Cache River Basin, Ark.; improvement works in St. 
Francis River Basin, Mo. and Ark., including backwater 
area, improvements in Belle Fountain Ditch and 
Drainage District No. 17, Ark.; Little River diversion 
channel, Mo., and L'Anguille River, Ark.; Wolf River 
Basin, Tenn.; Obion and Forked Deer River Basins, 
Tenn.; Reelfoot Lake area, Tenn. and Ky.; West 
Kentucky tributaries, Ky.; and Cairo-Mounds-Mound 
City area, Ill. 
Field operations of the Commission restricted to 
levee construction under section 6, 1928 Flood Control 
Act (local interests contributing one-third of costs and 
furnishing rights-of-way), are conducted within the 
following limits by two districts which report direct to 
the Commission on matters within their 
jurisdiction-St. Louis District: Mississippi River (sec. 
6) levees from upper limits of Memphis District to 
Clemens Station, Mo. (1,254 miles AHP) on right bank 
and Hamburg Bay, Ill. (1,215 miles AHP) on left bank, 
and the Illinois River from its mouth to mile 120 at 
Havana, Ill. Rock Island District: Mississippi River 
(sec. 6) levees from upper limits of St. Louis District to 
Rock Island, Ill. (1,437 miles AHP). Work accomplished 
is shown on Table 42-N. 
MISSISSIPPI RIVER AND ALLUVIAL 
VALLEY BELOW CAPE GIRARDEAU, 
MO. 
Location and description. Mississippi River rises in Lake 
Itasca, Minn., and flows generally southerly for 2,340 
miles through central portion of United States to empty 
into Gulf of Mexico about 115 miles below New 
Orleans. It is improved for barge navigation for about 
1,832 miles to Minneapolis, Minn. The Mississippi 
River and its major tributaries, the Missouri, Ohio, St. 
Francis, White, Arkansas, Yazoo, and Red-Old Rivers, 
drain 1,245,000 square miles in all or part of 31 States 
between the Rocky and Appalachian Mountains and 
part of two Canadian Provinces. Below Cape Girardeau, 
Mo., 53 miles above Ohio River, river bottom 
lands widen abruptly into an alluvial valley of about 
35,460 square miles which was originally subject to 
flood overflow. A major part of alluvial valley has been 
protected from floods by levees which confine floodflows 
within a flood plain having an average width of 
about 5 miles. (See map of alluvial valley of Mississippi 
River, scale 1:500,000.) Observations made by Mississippi 
River Commission to June 30, 1969, show 
approximate maximum and minimum discharges 
between levees as follows: Cairo to White River, 2,000, 
000 and 70,000 cubic feet per second; thence to Red 
River, 2,150,000 and 90,000 cubic feet per second; 
thence to the Gulf of Mexico, 1,500,000 and 80,000 
cubic feet per second in Mississippi River and about 
660,000 and 11,000 cubic feet per second in Atchafalaya 
River. As 1927 floodflow was not confined 
between levees, maximum discharges recorded do not 
include entire flow of 1927 flood, maximum of record 
below White River. High water and flood stages 
usually occur in late winter or early spring, but great 
floods such as that of 1937 occurred as early as January. 
Low water stages generally prevail from August to 
December. Extreme ranges in stages recorded at 
representative gages are about 60 feet at Cairo, 55 feet 
at Memphis,. 58 feet at Red River Landing, and 23 feet 
at New Orleans (Carrollton). River is nontidal above 
Red River Landing where tidal amplitude rarely 
exceeds 0.1 foot during extreme low water. 
Previous projects. For details see page 1944, Annual 
Report for 1932, and page 1682, Annual Report for 
1937. 
Existing project. For the Mississippi River and 
tributaries in alluvial valley between Head of Passes, 
La., and Cape Girardeau, Mo., provides for protection 
thereof from floods by means of levees, floodwalls, 
floodways, reservoirs (in Yazoo and St. Francis Basins), 
bank stabilization, and channel improvements in and 
along the river and its tributaries and outlets insofar as 
affected by backwater of Mississippi River, including 
levee work on main stem between Cape Girardeau and 
Rock Island. When completed, 23,621 square miles 
will be protected from the Mississippi River project 
flood. Project also provides for a 12- by 300- foot 
navigation channel between Baton Rouge, La., and 
Cairo, Ill.; for salinity control structures; and for 
channel realinement and improvement including bank 
stabilization and dikes to reduce flood heights, control 
natural tendency of river to lengthen by meandering, 
and protect levees from being destroyed by caving 
banks. Locations of major main stem Mississippi River 
improvements are shown in Table 42-A and those for 
off-main stem tributaries are shown in Table 42-B. 
Pertinent data on dams and reservoirs are shown in 
Table 42-C. Authorizing and Incorporating legislation 
are shown in Tables 42-D and 42-E. Summary of 
presently estimated Federal cost of authorized improvements 
is shown in Table 42-F. Construction of 
existing project began in 1928 and has continued 
throughout ensuing years. Based on the estimated cost 
of $2,831,763,000 (July 1, 1970 price levels) and actual 
expenditures through June 30, 1970 of $1,620,936,200, 
the entire project is about 57 percent complete. 
Recommended modifications. None. 
1220

MISSISSIPPI RIVER COMMISSION 
Local cooperation. The Flood Control Act of 1928, as 
amended, applies. Such requirements have, in general, 
been complied with by local interests. 
Terminal facilities. See volume 1 of 2-volume Port 
Series No. 21, 1969, "Ports on the Gulf Coast of the 
United States," for Baton Rouge and Lake Charles, 
La.; Port Series No. 20, 1969, for New Orleans, La.; 
also folio of Flood Control and Navigation Maps of 
Mississippi River, Cairo, Ill., to the Gulf of Mexico 
(37th edition), 1969. 
Project cost. Total monetary authorizations, including 
the modifications to June 30, 1970, are $1,851,922,600. 
Total allotted for flood control, including maintenance 
charges through August 18, 1941, chargeable under 
authorizations to June 30, 1970, was $1,630,838,100. 
(See Table 42-S.). (See also Tables 42-R, 42-T, and 42- 
U for additional financial statements.) 
Operations and results during fiscal year. Commission 
activities: The 280th session was held, October 20-25, 
1969, on board the U. S. MV Mississippi en route on the 
Mississippi River from Cape Girardeau, Mo., to Old 
River, La., on Old River to the Atchafalaya River, and 
on the Atchafalaya River to Morgan City, La. The 
281st session was held, May 11-15, 1970, on board the 
U. S. MV Mississippi en route on the Mississippi River 
from Cairo, Ill., to New Orleans, La. On these river 
trips, major features of the project were inspected, 
including bank protection works, contraction works, 
levees, and general channel conditions, to the extent 
permitted by river stages. Public meetings were held, at 
which representatives of local governmental agencies, 
navigation, levee, commercial, and other interests 
presented problems pertaining to flood control and 
navigation. During the 280th session, some members of 
the Commission inspected the East Atchafalaya guide 
levee from Krotz Springs to Morgan City, La. 
The President, Mississippi River Commission, and 
his engineering assistants made periodic inspections of 
flood control, navigation, and related works under the 
existing project along the Mississippi River and 
tributaries in the alluvial valley from Cape Girardeau, 
Mo., to the Gulf of Mexico. District Engineers held 
flood-fight planning conferences with local interests. 
Three favorable reports, prepared under MR&T 
authority, were as follows: 
"Muddy Bayou (Eagle Lake), Louisiana and Mississippi" 
to provide construction of a water-control 
structure in Muddy Bayou to regulate flows in and out 
of Eagle Lake to minimize fishery losses, was forwarded 
to the Chief of Engineers February 2, 1970. This 
modification was approved as a feature of the Yazoo 
backwater project March 3, 1970. 
"Improvement of Rocky Bayou, Yazoo County, 
Mississippi" to provide improvement on 0.1 mile of 
channel clearing riverward of the Rocky Bayou 
drainage structure and 7.7 miles of channel enlargement 
upstream from the structure, was forwarded 
to the Chief of Engineers March 6, 1970. Modification 
approved as a feature of the Yazoo headwater project 
April 29, 1970. 
"Additional Drainage Facilities Upper Pointe Coupee 
Loop Area, Louisiana" to provide for enlargement 
of Bayou Latenache from the Pointe Coupee drainage 
structure to Alabama Bayou. New Orleans District's 
revised report was approved June 4, 1970 and copies 
furnished the Chief of Engineers June 5, 1970. 
Improvement will be a feature of the Atchafalaya 
Basin project. 
Alluvial valley mapping: Contoured quadrangles and 
general maps of the alluvial valley are available for 
departmental use and public distribution under 
prescribed regulations. Road-map-type information 
folders of principal portions of overall project were 
published along with papers on subject of flood control 
and navigation. Preparation and publication of quadrangle 
maps (scale 1:62,500) continued. The 1969 
(37th) edition of the folio of flood control and 
navigation maps, scale 1:62,500, covering Mississippi 
River from Cairo, Ill., to Gulf of Mexico was compiled 
and printed. Some 6,893 flight-line miles of aerial 
photography (various scales) and 10 hours of oblique 
photography were flown along Mississippi River and 
tributaries and other areas in New Orleans, Vicksburg, 
and Memphis Districts. 
Work accomplished in the districts: New Orleans 
District-Series conversions of the Belle Isle, Morgan 
City, Napoleonville, New Orleans, and Spanish Fort 
quadrangles were printed. Work on the Bonnet Carre, 
Chef Menteur, Covington, Hahnville, Ponchatoula, 
Rigolets, St. Bernard, and Yscloskey quadrangles is 
nearing completion. Surveying, mapping, and scribing 
of hydrographic and topographic maps of Red River 
are now completed. The two folios of maps were 
printed by WES. 
Vicksburg District-Series conversion of U. S. 
Geological Survey 1:24,000 scale quadrangles to 1:62, 
500 scale with addition of flood control features of the 
Swan Lake, Miss. and Humphrey, Ark. quadrangles 
were completed and printed. Marks and Pace, Miss. 
quadrangles are in progress. 
Memphis District-Four series conversions, Brownsville 
and Bells, Tenn., and Henrico and Indian Bay, 
Ark., quadrangles were completed and printed. Greenville 
and Poplar Bluff, Mo., DeWitt, Ark., and Trague, 
Tenn., were completed and are ready for printing. 
Augusta and De Valls Bluff, Ark., and Whiteville, 
Tenn., are ready for color proofs. Alamo, Humboldt, 
Middleton, and Whiteville, Tenn., and Clarendon and 
Gregory, Ark., and Charleston, Mo., are in progress. 
Surveys, gages, and observations: Routine hydrographic 
surveys, construction surveys, and special surveys and 
inspections were made as required. Gages were 
maintained and discharge observations made. Results 
thereof are presented in detail in annual pamphlets 
issued by the districts. 
FLOODS: 
Memphis District -Mississippi River crest stage of 
49.16 feet at Cairo gage and maximum discharge of 1, 
168,000 cubic feet per second occurred on May 7, 1970, 
1221

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
due to moderate to heavy rains that fell, during the 
period April 18-May 1, over the lower Missouri River 
and Ohio River Valley. 
Vicksburg District -Mississippi River crest stage of 
36.79 feet on the Arkansas City gage on May 15 was 
the high est recorded since 1962. Crest stages at 
Arkansas City, Vicksburg, and Natchez were 7.2, 1.0, 
and 2.2 feet below flood stage, respectively. Crest stage 
on the Ouachita River occurred at Arkadelphia on 
March 4 at 19.0 feet, 2 feet above flood stage, and at 
Camden on March 8, at 33.0 feet, 7 feet above flood 
stage. Flood control works reduced crest stages about 5 
feet at Arkadelphia and about 3 feet at Camden. Stages 
on the Coldwater-Tallahatchie-Yazoo kivers were 
moderately high, December through May 1970. The 
crest stage on the Tallahatchie River at Swan Lake 
occurred in March and was 0.3 feet above flood stage. 
Operation of flood control works effected reductions 
averaging about 5 feet on the Coldwater and Tallahatchie 
Rivers, about 7 feet at Greenwood, and 4 feet 
at Yazoo City. Crest stages on the Big Black River were 
about 8 feet above bankfull. 
New Orleans District -No flood stages were recorded 
in the lower Mississippi and Red River Basins. 
Investigations and reports: Surveys and reports prescribed 
under existing project, and called for by 
congressional or departmental directives, were made as 
required. Memphis District expended $33,173 on one 
navigation study, $318,585 on six flood control studies, 
and $39,999 on collection and study of basic data. 
Vicksburg District expended $54,477 on one navigation 
study, $205,287 on four flood control studies, 
and $70,725 on collection and study of basic data. New 
Orleans District expended $65,497 on three flood 
control studies and $20,272 on one navigation study. 
Surveys were made and gages operated and maintained. 
In addition, $577,460 was expended on the West 
Texas and Eastern New Mexico Water Import Study 
to determine the advisability of improvements for 
exporting, by the most feasible means, surplus water, if 
any, in the Mississippi River system to water-deficient 
areas. This investigation is being made in cooperation 
with the Bureau of Reclamation in its current 
reconnaissance studies of measures for importing water 
into west Texas and eastern New Mexico. The 
Southwestern Division, Corps of Engineers, will make 
studies for that portion of the area within its boundaries. 
MISSISSIPPI RIVER-LEVEES 
Operations and results during fiscal year. Enlargement of 
dikes and restoration of eroded portions of existing 
levees; enlargement of existing levees to approved 
grade and section, 0.8 mile in New Orleans District, 
and 1.3 miles in Memphis District; construction of 
levee berms, 3.8 miles in Vicksburg District, and 1.7 
miles in Memphis District; surfacing material placed 
on 1.3 miles of levee roads in Memphis District; and 
construction of 0.8 mile of new levee wavewash 
protection along the lower Mississippi River below 
Baton Rouge. Restoration of damaged wavewash and 
foreshore protection was accomplished as required. For 
further details see Tables 42-K, 42-L, and 42-M. 
Condition at end of fiscal year. There are 1,597 miles of 
levee now authorized for the Mississippi River below 
Cape Girardeau, of which 1,565 are in place with 1,390 
built to approved grade and section. (Above figures 
include 72 miles on completed separable features.) The 
Main Stem Levee System consisting of 2,192 miles, of 
which 1,876 have been completed, includes additional 
levees and structures along the south bank of Arkansas 
River (85.4 miles); along the south bank of Red River 
(59.8 miles, with 51.6 completed); and 449.2 miles in 
the Atchafalaya River Basin, with 349.1 essentially 
completed (216.1 to grade and section and 133.0 to 
grade only). Graveled or hard-surfaced roads have 
been constructed on 970 miles of these levees. (Tables 
42-K, 42-L, and 42-M.) Below Baton Rouge, in New 
Orleans District, about 137 miles of levee are protected 
against river wavewash by timber structures or leveeslope 
pavement. In order to insure adequacy of main 
stem levees, including those on south banks of Arkansas 
and Red Rivers, additional levee construction is 
recommended to provide a standard 3-foot freeboard, 
adequate levee cross section, construction of berms for 
levee stabilization and seepage control, levee wavewash 
protection where necessary, drainage structures, and 
roadways for proper inspection and maintenance. 
Status of levees authorized under provisions of 
section 6, 1928 act is summarized in Table 42-N. 
MISSISSIPPI RIVER-CHANNEL 
IMPROVEMENTS 
Operations and results during fiscal year. Engineering 
studies: Continued a research program for development 
of materials and more effective and economical 
procedures for placing and stabilizing 
Mississippi River in a suitable alinement. 
Bank revetment and dikes: Construction of 13.0 
miles of new bank revetment and 6.0 miles of 
reinforcement of existing revetment was completed by 
Government plant and hired labor, and construction of 
11.7 miles of new dikes was completed by contract. 
Further data concerning this work are shown by 
districts in Tables 42-H, 42-I, and 42-J. 
Dredging: Work included dredging 48,609,000 cubic 
yards for channel and harbor maintenance and 
channel construction and revetment. Minimum channel 
depth of 9 feet was maintained. Dredging shown in 
Table 42-G was done with the following plant: New 
Orleans District, one contract cutterhead dredge and 
one Government-owned dustpan dredge (on loan); 
Vicksburg District, one Government-owned dustpan 
dredge, one Government-owned dustpan dredge (on 
loan), and one leased cutterhead dredge; and Memphis 
District, three Government-owned dustpan dredges 
and one leased cutterhead dredge. (See also Tables 42- 
O, 42-P, and 42-Q). 
Other work performed in interest of navigation, 
supplementing maintenance dredging on Mississippi 
1222

MISSISSIPPI RIVER COMMISSION 
River between Cairo, Ill., and Baton Rouge, La., 
included removal of snags, wrecks and obstructions; 
issuance of bulletins by the Vicksburg District providing 
information on available high-water velocities 
at selected locations; maintaining bulletin boards 
showing daily gage readings at regular MRC gages; 
and contact pilot service furnishing navigation with 
latest information and advice on channel conditions 
and obtaining their views as to needs of navigation 
interests. Cost of this work is given in Table 42-R. 
Condition at end offiscalyear. In carrying out authorized 
channel improvement program between Baton Rouge 
and Cairo, 16 cutoffs were developed between 1933 and 
1942. These, combined with chute channel development 
and alinement improvements, decreased 
channel length between these cities by about 180 miles. 
Effect of this channel shortening, in increasing its floodcarrying 
capacity, is stated on page 1811, Annual 
Report for 1943. Much progress has been made in 
advancing overall channel stabilization program, 
involving construction of bank revetment, dikes, and 
improvement dredging, to prevent river from regaining 
its former length due to its natural tendency to 
meander. There are now in place 608 miles of operative 
bank revetment and 114 miles of dikes on Mississippi 
and lower Ohio Rivers as listed on Tables 42-H, 42-I, 
and 42-J. A navigation channel 9 by 300 feet is 
maintained by dredging as required during low-water 
season. Due to growing effectiveness of channel 
improvement program, average maintenance dredging 
requirements are steadily being reduced, and an 
increase in navigable depth is being obtained. A longrange 
plan has been developed and recommended to 
bring about desired program of channel improvement 
between Cairo and Head of Passes including additional 
bank revetment, dredging, contraction works, and 
foreshore protection. Approximately 93 miles of 
foreshore protection have been constructed along the 
lower Mississippi River. 
NEW ORLEANS DISTRICT 
ATCHAFALAYA BASIN, LA. 
Operations and results during fiscal year. New work by 
hired labor: Real estate activities and planning for 
construction were continued. 
Bank stabilization consisted of placing 1.7 miles of 
articulated concrete mattress between miles 13 and 18 
at McCrea, Woodside, Provosty, and Crooked Bayou, 
La., on the Atchafalaya River, and reinforcement of 
0.1 mile of existing revetment at Provosty, La. 
New work by contract: Construction of floodside and 
landside berms and levee enlargement continued on 
the east and west protection levees. In completing 
contracts initiated in previous fiscal years, approximately 
826,957 cubic yards of levee and berm 
embankment were placed in the east protection levee 
over a distance of 5.9 miles and 328,789 cubic yards in 
the west protection levee for 2.9 miles. Three contracts 
for enlargement of the east protection levee were 
initiated, involving placement of 7,421 cubic yards this 
fiscal year for a distance of 0.4 mile. 
Maintenance by hired labor: Bayou Boeuf, Berwick, 
and Bayou Sorrel locks, Morganza control structure, 
and the numerous drainage and flood control structures 
were operated and maintained as required 
throughout the fiscal year. 
Clearing, dressing and seeding of hydraulic berms on 
the east and west protection levees was accomplished 
intermittently during the year. 
Maintenance of existing revetments was performed 
during the fiscal year. 
Approximately 18 miles of clearing and snagging 
and removal of shoal in west protection levee borrow 
pits were accomplished between August 18, 1969 and 
March 2, 1970. 
Maintenance by contract: Construction of a setback 
at Toles in the East Atchafalaya River levee, mile 34.5, 
was initiated on March 6, 1970, and is 23 percent 
complete. One slide at Toles, East Atchafalaya River 
levee, Item A-34.0-L, two in the east protection levee, 
Item E-46.0, and one in the west protection levee, Item 
W-99.0, were repaired during the fiscal year. Approximately 
96,540 cubic yards of embankment were 
placed in the setback and 98,835 cubic yards in the 
slide repairs. 
Dredging at Three Rivers by the dredge Holland 
consisted of removal of 53,507 cubic yards of shoal 
between July 25 and 30, 1969. The dredge M. H. Bean 
removed 13,336 cubic yards between March 16 and 18, 
1970 in excavating a channel on Item E-46.0 to restore 
the drainage capacity of the landside borrow pit. 
Condition at end offiscalyear. Construction was initiated 
August 7, 1929 with the commencement of the west 
protection levee from Bordelonville to Hamburg. The 
project is 45 percent complete, based on the current 
estimated cost of $381,000,000 which includes funds for 
Upper Pointe Coupee Loop Area. The 449.2 miles of 
levees and floodwalls authorized for the system have 
been constructed with 349.1 miles built to grade and 
section. See Table 42-K for status of levees. 
Major components completed include Morganza 
and West Atchafalaya Floodways including railroads 
and highway crossing, (except permanent paving of U. 
S. Highway 190 crossing the West Floodway), Wax 
Lake Outlet, Charenton drainage canal, three navigation 
locks, ten pumping plants, Atchafalaya River 
navigation channel, and numerous flood control and 
drainage structures. 
Major items remaining to be completed include 
completion of levees to grade and section, channel 
improvement by dredging to reduce flowline, and bank 
stabilization. The channel has been enlarged to 60,000 
square feet from mile 54.5 to 96.2, and to 40,000 square 
feet from mile 96.2 to 112.3. Enlargement to 100,000 
square feet from mile 54.5 to 112.3 remains to be done. 
Drainage improvements in Upper Pointe Coupee Loop 
Area have not been initiated. Approximately 9.8 miles 
of bank stabilization has been placed as shown in Table 
42-H. 
1223

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
BATON ROUGE HARBOR (DEVILS 
SWAMP), LA. 
Operations and results during fiscal year. Maintenance by 
hired labor consisted of dredging to remove shoal by 
Government-owned dredge Jadwin on loan from 
Vicksburg District. During period from September 21- 
22, 1969, 72,600 cubic yards were removed from the 
harbor. Maintenance by contract dredge Holland 
consisted of removing 60,285 cubic yards from the 
entrance channel between July 1 and 22, 1969. 
Condition at end of fiscal year. Construction of the first 
2.5 miles of the proposed 5.0 miles of channel was 
initiated in January 1958 and completed in July 1959, 
with 7,458,086 cubic yards excavated. 
The project is 24 percent complete, based on the 
current estimated Federal cost of $4,920,000 and cash 
contributions of $750,000. Completion of the remaining 
2.5 miles is dependent on economic justification 
by developments on the initial channel. 
BAYOU COCODRIE AND TRIBUTARIES, 
LA. 
Operations and results during fiscal year. Maintenance by 
hired labor consisted of condition and operation 
studies. 
Condition at end of fiscalyear. Construction was initiated 
in June 1946 and is 47 percent complete (see p. 2031, 
Annual Report for 1961 for description of completed 
work). 
Work required to complete the project consists of 
enlargement of 13.5 miles of upper Bayou Boeuf, 
channel improvement of 25.3 miles of Bayou Cocodrie, 
construction of a diversion channel from the lower end 
of the existing diversion channel near Washington, La. 
to Bayou Courtableau drainage structure, and enlargement 
of the drainage structure. 
Local interests have refused to furnish assurances 
necessary for completion of the project. 
BONNET CARRE SPILLWAY, LA. 
Operations and results during fiscal year. Ordinary 
maintenance of the control structure and spillway 
continued. 
Condition at the end of fiscal year. Construction of the 
spillway was initiated in fiscal year 1929. The control 
structure was completed in 1931, levees were completed 
in 1932, and utility crossings completed in 1936. 
It was necessary to operate the structure to reduce 
flood stages in 1937, 1945, and 1950. 
LOWER RED RIVER - SOUTH BANK RED 
RIVER LEVEES, LA. 
Operations and results during fiscalyear. Maintenance by 
hired labor consisted of condition and operation 
studies, real estate planning and engineering studies. 
Condition at end of fiscal year. Construction was iniated 
in fiscal year 1929 and is 40 percent complete, based on 
the current estimated cost of $22,000,000, (see Table 
42-K for status of levees and Table 42-H for status of 
revetments). 
OLD RIVER, LA. 
Operations and results during fiscal year. Maintenance by 
hired labor consisted of operation and maintenance of 
the lock and control structures as required, maintenance 
of cleared areas, operation of a picket boat at 
the inflow channel to the low-sill control structure 
during high river stages, repair of existing revetment, 
and removal of shoal from the lock forebay. The 
Vicksburg District's dredge Jadwin removed 59,276 
cubic yards from the forebay between June 2-3, 1970. 
Maintenance by contract consisted of removal of 
shoal from lock forebay. The dredge Holland removed 
150,444 cubic yards from the forebay between July 14 
and August 7, 1969. 
Condition at end of fiscal year. Construction began 
September 1955 and is 88 percent complete, based on 
the current estimated Federal cost of $75,200,000. 
Principal items completed are as follows: Low-sill 
structure June 1959; overbank structure October 1959; 
levees and levee enlargements October 1963; inflow 
and outflow channels February 1961; navigation lock 
completed December 1962, and opened to navigation 
March 1963, at which time Old River was closed to 
navigation with a rock and earth fill dam; highway 
approaches and bridge over lock completed March 
1965. Approximately 4.5 miles of bank protection has 
been constructed at the inflow and outflow channels. 
(See Table 42-H for details of bank protection.) 
Principal items remaining to complete the project 
consist of constructing additional bank protection 
works, providing additional scour protection in the 
inflow and outflow channels, an additional gantry 
crane for the low-sill structure, and construction for the 
prevention of marine accidents at the low-sill structure. 
VICKSBURG DISTRICT 
TENSAS BASIN, LA. AND ARK. 
Operations and results during fiscal year. 
(a) Boeuf and Tensas Rivers, etc. Reach 1, Tensas River 
completed; planning and design continued on project 
features; planning and design were initiated on the 
Lake Chicot Pumping Plant. 
(b) Red River backwater area. Levees. Levee Item No. 2 
completed; levee Item No. 3A-1 was initiated; and 
construction continued on Reach No. 2. Catahoula 
Lake Control Structure was initiated in May 1970. 
Relocation of U. S. Highway 84 essentially complete. 
Planning and design were continued on project 
features. 
Condition at end offiscalyear. 
1224

MISSISSIPPI RIVER COMMISSION 
(a) Boeuf and Tensas Rivers, etc. Channel improvement 
has been accomplished on 710.7 miles of project 
streams, providing major drainage outlets for the 
tributary areas. 
(b) Red River backwater area. Levees in Tensas-Cocodrie 
area are complete. The work comprises 93.1 
miles of new levee, excluding 2.1 miles of high ground 
where no levees are required, and 72.3 miles of gravel 
road on levees. The Tensas-Cocodrie area pumping 
plant, authorized in October 1965, is in the planning 
and design stage. Construction of Larto Lake to 
Jonesville levees west of Black River is under way. 
Planning and design are continuing. 
LOWER ARKANSAS BASIN, ARK. 
Operations and results during fiscal year. Arkansas River 
levees. Above Smith Lake levee repairs and Lake Dian 
and Cummins-South Bend stability berms restoration 
were completed in April 1970. 
Condition at end of fiscal year. Arkansas River levees. A 
total of 56.2 miles of the 61.5 miles of north bank levees 
and all of the 85.4 miles of south bank levees have been 
completed to approved grade and section. These levees 
above mile 40 are protected by bank-protection works 
constructed as a feature of project for Arkansas River 
and tributaries, Arkansas and Oklahoma. For present 
status of this work see report of Little Rock District. 
Below mile 40, needed bank protection is constructed 
with project maintenance funds. 
YAZOO BASIN, MISS. 
Operations and results during fiscal year. 
(a) Yazoo City and Belzoni protection works. Hired labor 
forces continued operation and maintenance of levees, 
drainage facilities, and pumping plant. 
(b) Greenwood protection works. Hired labor forces 
continued operation and maintenance of pumping 
plant, levees, and drainage facilities. Relocation of the 
sanitary sewerage outfall system continues. 
(c) Main stem. Planning and design of levees and 
channel improvements are continuing. Construction: 
(1) None this fiscal year. (2) Channel maintenance. 
Random clearing and snagging and herbicide willow 
control continued as required in Coldwater, Tallahatchie, 
and Yazoo Rivers, and Will M. Whittington 
Auxiliary Channel. 
(d) Big Sunflower River. Construction. Channel 
improvement, Steele Bayou Item 17A (mile 11.4-23.3), 
was completed. 
(e) Tributaries. Construction: (1) Levees. Pancla- 
Quitman Floodway, Item A (mile 17.9-19.1), started in 
September 1968, was completed. Construction of 
bridges across the Panola-Quitman Floodway at 
Paducah Wells, Miss., and Crowder, Miss., was 
continued. Construction continued on Hillside Floodway, 
Item 4. Construction initiated on Tipton Bayou 
Drainage Structure. Emergency repairs to Pelucia 
Creek levee were completed. (2) Acquisition of lands. 
The purchase of lands in the Hillside Floodway is 
complete. (3) Maintenance. Maintenance of channels 
of Yalobusha, Little Tallahatchie, and Yocona Rivers, 
Cassidy, David, Burrell, and Bobo Bayous, and 
Ascalmore Creek by random clearing and snagging 
and herbicide willow control continued as required. 
(f) Enid Reservoir. (See Table 42-C.) Construction and 
maintenance of public use facilities is continuing. 
Restoration of borrow pit and waste area is under way. 
The dam and appurtenant structures were maintained 
and operated. Rehabilitation of boat channels, and 
snagging and clearing of tributary streams in the 
reservoir area is continuing. Maximum pool elevation 
in reservoir was 267.4 feet above mean sea level on May 
13, 1970. This elevation established a new maximum of 
record for Enid Reservoir. Storage in flood control pool 
amounted to 584,400 acre-feet. Peak inflow was 50,000 
cubic feet per second on March 19,1970. On June 30, 
1970, pool elevation was 263.2 feet above mean sea 
level, when storage in flood control pool amounted to 
476,300 acre-feet. Construction of a 40-foot by 100-foot 
shop-storage building for project operations was 
initiated and completed. 
(g) Grenada Reservoir. (See Table 42-C.) Construction 
and maintenance of public use facilities is continuing. 
Restoration of borrow pit and waste is under way. The 
dam and appurtenant structures were operated and 
maintained. Maintenance snagging and clearing of 
tributary streams in the reservoir area continued. 
Maximum pool elevation in reservoir was 226.8 feet 
above mean sea level on May 5, 1970, when storage in 
flood control pool amounted to 998,600 acre-feet. Peak 
inflow was 60,000 cubic feet per second on March 20, 
1970. On June 30, 1970, pool elevation was 221.2 feet 
above mean sea level, when storage in flood control 
pool amounted to 714,600 acre-feet Construction of a 
40-foot by 100-foot shop-storage building for project 
operations was initiated and completed. 
(h) Sardis Reservoir. (See Table 42-C.) Construction 
and maintenance of public use facilities is continuing. 
Restoration of borrow pit and waste area is under way. 
The dam and appurtenant structures were maintained 
and operated. Clearing of tributary streams in the 
reservoir area is continuing. Maximum pool elevation 
in reservoir was 278.3 feet above mean sea level on May 
14, 1970. This elevation established a new maximum of 
record for Sardis. Storage in flood control pool 
amounted to 1,286,100 acre-feet. Peak inflow was 36, 
000 cubic feet per second on April 2, 1970. On June 30, 
1970, pool elevation was 273.1 feet above mean sea 
level, when storage in flood control pool amounted to 1, 
020,800 acre-feet. Hired labor forces grouted around 
the outlet works conduit to stop leaking of several 
monolith joints. 
(i) Arkabutla Reservoir. (See Table 42-C.) Construction 
and maintenance of public use facilities is continuing. 
Restoration of borrow pit and waste area is under way. 
The dam and appurtenant structures were maintained 
and operated. Clearing of tributary streams in the 
1225

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
reservoir area is continuing. Maximum pool elevation 
in reservoir was 231.9 feet above mean sea level on May 
12, 1970, when storage in flood control pool amounted 
to 308,100 acre-feet. Peak inflow was 50,000 cubic feet 
per second on March 4, 1970. On June 30, 1970, pool 
elevation was 229.3 feet above mean sea level, when 
storage in flood control pool amounted to 248,900 acrefeet. 
Hired labor forces grouted monolith joints in the 
outlet works conduit when several joints were found to 
be leaking. Construction was begun on a 40-foot by 
100-foot storage-shop building for project operations. 
As a result of conditions that developed in the 
structural drainage systems at the spillway, the 
following operations were completed by contract: 
a. The spillway stilling basin was dewatered and 
cleaned out. 
b. Six wall drains, six well drains, fifty-six gravel 
drains, and eight piezometers were installed. 
(j) Yazoo Basin backwater. Relocation of Illinois 
Central Railroad bridge is complete. Work initiated on 
Item 14 levee construction, contract award made on 
Item 16, channel construction restoration work complete 
on Items 1 through 3, and essentially complete on 
Items 4 and 5. 
Condition at end of fiscalyear. The first feature of Yazoo 
Basin Project was started in 1936 and the total project 
is about 55 percent complete. 
MEMPHIS DISTRICT 
ST. FRANCIS BASIN, ARK. AND MO. 
Operations and results during fiscal year. 
(a) Little River drainage. Two contracts for channel 
excavation and six channel maintenance contracts 
(brush kill, cleanout, and clearing) were awarded or in 
process. Four completed channel maintenance contracts 
involved 12 miles of brush kill, 17 miles of 
clearing, and 6 miles of cleanout. Forty-seven miles of 
hired labor brush kill were completed. Three reimbursable 
contracts for alteration of St. Louis Southwestern 
Railway bridges across Ditch 66-251, vicinity- 
Bragg, Mo.; across Ditch 1 (Lower), vicinity Bragg, 
Mo.; and across Ditch 251, vicinity Lilbourn, Mo., are 
essentially complete (remaining work, installation of 
sway bracing and drift guard, will be performed after 
channel excavation under bridges has been performed 
by others). Two reimbursable contracts were awarded 
or in progress for alteration of St. Louis-San Francisco 
Railway bridge across Ditch 81 extension, vicinity of 
Manila, Ark., and alteration of U. S. Highway 62 
bridge across Ditch 19, vicinity of Campbell, Missouri. 
(b) Upper St. Francis River and floodway. One contract 
for construction of Missouri Route "D" bridge, 
Wappapello-Crowleys Ridge was completed. Three 
channel maintenance contracts which involved 27 
miles of brush kill and 26 miles of clearing were 
completed. Two channel maintenance brush kill 
contracts were awarded during June. 
(c) Lower St. Francis River. One completed contract 
involved 1,096,604 cubic yards of channel excavation. 
Three channel maintenance contracts involving 47 
miles of brush kill and 7 miles of clearing were 
completed. One reimbursable contract was completed 
for alteration of Arkansas State Highway 42 across Big 
Creek. Reimbursable contract for alteration of Arkansas 
State Highway 42 (grade raise) is in process. 
Thirty-five miles of brush kill, performed by hired 
labor forces, were completed. Contract for furnishing 
equipment and machinery for W. G. Huxtable 
Pumping Plant was in process. Contract for channel 
excavation, plug removal, Tyronza River, was in 
process and 176,620 cubic yards were removed. 
Placement of 318,085 cubic yards for new levees was 
accomplished. 
(d) Wappapello Reservoir. (See Table 42-C.) Development 
of public access areas continued. About 1, 
687,000 persons visited the reservoir area. Maintenance 
of the dam, appurtenant structures, and 
project lands, including recreation facilities, and 
mosquito control operations were continued. Leases to 
private individuals for commercial and agricultural 
purposes continued. Missouri Department of Conservation 
maintained fish and wildlife conservation 
program under agreement with Secretary of Army. 
The USGS collected and analyzed water samples 
under the water quality investigation program. Maximum 
water surface elevation was 363.56 feet msl on 
April 22, 1970, with a flood control storage 97,840 acrefeet. 
Peak inflow into the reservoir was 29,920 cubic 
feet per second on April 20, 1970. Maximum outflow 
during the year was 6,880 cubic feet per second on 
April 23, 1970. An operation and recreational study 
resulted in a one-foot increase in the summer pool. In 
December 1969 the rule curve elevation was lowered to 
353 feet mean sea level for aquatic plant control 
purposes. 
Condition at end of fiscal year. 
(a) Little River drainage. Project was initiated in 1938 
and is 40 percent complete. 
(b) & (c) St. Francis River (Upper and Lower). Project 
was initiated in 1937 and is 39 percent complete. 
(d) Wappapello Reservoir. Project was initiated in 1938 
and completed in 1941. 
WEST TENNESSEE TRIBUTARIES, TENN. 
Operations and results during fiscal year. 
(a) Obion River, Tenn. Channel work continued with 
excavation of 6,614 cubic yards. Contract was awarded 
for channel improvement item, South Fork, Obion 
River. Reimbursable contract for alteration of Illinois 
Central Railroad bridge across main stem was completed. 
Reimbursable contract for alteration of Illinois 
Central Railroad bridges across South and Middle 
Forks is essentially complete (remaining work, installing 
sway bracing, will be performed after channel 
excavation under bridges has been completed by 
1226

MISSISSIPPI RIVER COMMISSION 
others). Contract for channel excavation, plug re- North and South Forks, Forked Deer River was 
moval, main stem, was completed. awarded. 
(b) Forked Deer River, Tenn. Contract for channel 
improvement item, South Fork, Forked Deer River was Condition at end offiscalyear. 
completed. Contract awarded for channel im- (a) Obion River, Tenn. Project, initiated in 1961, is 68 
provement item, North Fork, Forked Deer River. percent complete. 
Contract for county bridge, mile 4.87, Middle Fork, (b) 
Forked Deer River is in process. Reimbursable contract Forked Deer, Tenn. (Project, initiated in 1966, is 8 percent 
for alteration of Illinois Central Railroad bridges across complete.) 
1227

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
MISSISSIPPI RIVER IMPROVEMENTS 
Mileage 
Above Head Locality Improvement Remarks 
of Passes 
0-957 Head of Passes, La.-Cairo, Ill. 
10-81 
11-25 
38 
45 
59 
75 
44-91 
81-96 
91-104 
96-279 
104-234 
127-129 
235 
The Jump-New Orleans, La. 
Baptiste Collette-Bayou Ostrica, 
La. 
Homeplace, La. 
Bohemia, La. 
Myrtle Grove, La. 
Scarsdale, La. 
Bohemia, La-New Orleans, La. 
New Orleans, La. 
New Orleans, La. 
New Orleans-Morganza, La. 
New Orleans-Baton Rouge, La. 
Bonnet Carre Floodway, La. 
Baton Rouge Harbor 
279-287 Morganza Floodway, La. 
287-303 Morganza-Old River, La. 
303-314 Old River, La., control 
306-572 Old River-Cypress Creek, Ark. 
437 Vicksburg Harbor, Miss. 
437-721 Vicksburg-Lake View, Miss. 
537 Greenville Harbor, Miss. 
605-665 Henrico-Helena, Ark. 
672-993 St. Francis River-Commerce, Mo. 2 
720-725 Industrial Levee (Ensley Bottoms) 
721-734 Memphis Harbor, Tenn. 
803-873 Tiptonville-Obion River 
890 St. Johns Bayou, Mo. 
890 New Madrid Floodway, Mo. 
890-954 New Madrid-Birds Point, Mo. 
902-922 Slough Bend-Hickman, Ky. 
922 Hickman, Ky. 
9571 Cairo, Cairo drainage district 
9571 Cairo, Cairo drainage district, 
Mounds, Mound City, and 
vicinity 
Thebes-Rock Island, Ill. 
Cape Girardeau, Mo., to Rock 
Island, Ill. 
Dredging, revetment, and contraction 
work 
Main line levee, right bank 
Main line setback, left bank 
Salinity control structure, right bank 
Salinity control structure, left bank 
Salinity control structure, right bank 
Salinity control structure, left bank 
Main line levee and floodwall, left bank 
Main line levee, right bank 
Main line levee and floodwall, left bank 
Main line levee, right bank 
Main line levee and floodwall, left bank 
Regulating spillway, left bank 
Devils Swamp barge channel 
Regulating spillway, right bank 
Main line levee, right bank 
Levee closure and enlargement, low and 
high water spillway structures, navigation 
lock, and approach channels, 
right bank. 
Main line levee, right bank 
Harbor extension and industrial fill 
Main line levee, left bank 
Harbor improvements and industrial fill 
Main line levee and floodwall, right bank 
Main line levee, right bank 
Levee and pumping station 
Closure of Tennessee Chute, industrial 
fill, levee, harbor channels, etc. 
Main line levee, left bank, levee extension, 
and diversion of Obion River 
Drainage floodgate and levee closure 
Drainage floodgate and levee closure 
Floodway, right bank 
Main line levee, left bank 
Floodwall, left bank 
Floodwalls and levees 
Floodwalls, levees, and pumping plant 
Levees, both banks 
Levees 
Authorized by Public Law 89-298 
Authorized by Public Law 89-298 
Authorized by Public Law 89-298 
Authorized by Public Law 89-298 
Authorized by Public Law 81-516 
Authorized by Public Law 81-516 
Authorized by Public Law 80-858. 
Modified by Public Law 87-874. 
Extends up south bank of Old River 
to Barbre Landing 
Authorized by Public Law 83-780 
Joins Arkansas River, south bank 
levee 
Authorized by Public Law 70-391. 
Modified by Public Laws 79-526 
and 83-780. 
Authorized by Public Law 85-500 
Authorized by Public Law 79-526 
Authorized by Public Law 79-526 
Authorized by Public Law 79-526 
Authorized by Public Law 83-780 
Intermittent (sec. 6) 
Intermittent (sec. 6) 
1. Cairo, Ill., is on Ohio River about 3 miles above its mouth (Mississippi River mile 954 AHP). 
2. Commerce, Mo., is on Upper Mississippi River, 39 miles above mouth of Ohio River. 
1228 
TABLE 42-A

MISSISSIPPI RIVER COMMISSION 
TABLE 42-B MISSISSIPPI RIVER TRIBUTARY AND OUTLET IMPROVEMENTS 
Mileage 
Below Head 
of Atchafalaya 
River Locality Improvement Remarks 
ATCHAFALAYA BASIN, LA. 
A tchafalaya Basin, Morganza 
and West A tchafalaya Flood ways 
0-54 West Atchafalaya Floodway between 
Red River and Alabama Bayou 
27-54 Morganza Floodway between 
Mississippi River and Alabama 
Bayou 
54-117 Atchafalaya Basin Floodway 
between Alabama Bayou and 
Morgan City 
East protection levee (Morganza 
and Atchafalaya Floodways) 
20-27 Lacour-Red Cross 
25-117 Morganza-Morgan City 
27 Bayou Latenache 
0-27 Upper Pointe Coupee Loop Area 
31-57 Bayou Fordoche-Ramah 
80 Bayou Sorrel1 
53-117 Bayou Sorrel lock-Morgan City 
117 Morgan City 
117-129 Below Morgan City 
117-129 Below Morgan City 
A tchafalaya Basin Floodway, 
lower protection levee 
105 Calumet 
105-120 Below Morgan City 
115 Berwick t 
116 Patterson 
West protection levee (A tchafalaya 
Basin and WestA tchafalaya Floodways) 
5 Simmesport-Hamburg 
5-105 Mansura to Wax Lake Outlet 
Coulee des Grues 
West Atchafalaya Floodway 
Morganza Floodway 
Bayou Darbonne 
West Atchafalaya Floodway 
Morganza Floodway 
Bayou Courtableau 
West Atchafalaya Floodway 
Morganza Floodway 
Charenton 
Floodway 
Floodway 
Floodway 
Levee, upper Morganza guide 
Levee and Morgan City floodwall 
Drainage structure, Point Coupee, and 
channel enlargement 
Additional drainage facilities 
Drainage channel 
Lock 
Alternate navigation channel, Gulf 
Intracoastal Waterway 
Lock in Bayou Boeuf 1 
Channel relocation 
Levees, floodwall 
Floodgate, east 
Levees, floodwall; drainage structures, 
and pumping plants 
Lock 
Water system 
Levee fuse plug 
Protection levee 
Levee enlargement and floodgate 
extension 
Railway 
Railway 
Gated drainage structures 
Highway 
Highway 
Gated drainage control structures 
and channels 
Railway 
Railway 
Floodgate and approach channels 
Including lower Morganza Floodway 
guide levee 
Through upper Morganza guide levee 
and enlargement of outlet channel 
Enlargement of Bayou Latenache 
Approved June 4, 1970 
Levee landside borrow pit 
Alternate route, Gulf Intracoastal 
Waterway Port Allen to Morgan City 
Gulf Intracoastal Waterway utilizes 
levee west side borrow pit channel 
Gulf Intracoastal Waterway 
Bypass route for Gulf Intracoastal 
Waterway traffic 
East of lower river 
Bayou Teche-Wax Lake Outlet 
Inclosed area between Wax Lake Outlet 
and Berwick 
Lower Atchafalaya River 
Adjustment to provide fresh water 
West Atchafalaya Floodway 
Through West Atchafalaya protection 
levee 
Borrow pit channel to Grand Lake 
through West Atchafalaya protection levee 
1229 
451-584 0-72-78 
29 
29 
40 
40 
40 
41 
41 
41 
94

TABLE 42-B (Cont'd) 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
MISSISSIPPI RIVER TRIBUTARY AND OUTLET IMPROVEMENTS 
Mileage 
Below Head 
of Atchafalaya 
River Locality Improvement Remarks 
ATCHAFALAYA BASIN, LA. 
(Continued) 
94 Jaws-Lake Fausse Pointe 
105 Calumet 
105 Wax Lake Outlet 
0-54 
5-6 
5-66 
28-30 
40-41 
54-117 
Atchafalaya River 
Barbre Landing-Alabama Bayou 
Simmesport 
Simmesport-Bayou Garotier 
Melville 
Krotz Springs 
Below Alabama Bayou 
94-106 Mississippi River-Morgan City 
TECHE-VERMILION BASINS, 
LA. 
Atchafalaya River to Teche- 
Vermilion Basins 
Mileage 
Above 
Mouth 
COURTABLEAU BASIN, LA., 
AND OUTLETS 
0-8 Charenton Canal 
50-133 West Atchafalaya protection 
levee borrow pit channel 
96 Bayou Courtableau spillway 
133 Bayou des Glaises 
Bayou Cocodric and tributaries 
0-17 Bayou Cocodrie 
17-40 Bayous Cocodrie-Boeuf diversion 
40-51 Bayou Boeuf 
51-60 Bayous Boeuf-Rapides diversion 
17-42 Upper Cocodrie 
Bayou Boeuf 
87-107 Bayou Lamourie to Kincaid 
Lecompte control structure 
Bayou Rapides control structure 
Bayou Lamourie control 
Various 
LAKE PONTCHARTRAIN, LA. 
Lake Pontchartrain, Jefferson 
Parish, La. 
AMITE RIVER, LA. 
Amite River, La. 
Outlet, Charenton drainage and canal 
protection levee 
Floodgate, west 
Drainage canal-railway and highway 
bridges 
East bank, levee 
Levee, ring, and drainage structure 
West bank, levee 
Levee, ring 
Levee, ring 
Channel enlargement 
12- by 125-foot navigation channel 
Pumping station above Krotz Springs, 
conveyance channels, and appurtenant 
works 
Drainage channel 
Drainage channel 
Restoration of drainage west of West 
Atchafalaya Basin protection levee 
Bayou Teche and Wax Lake Outlet 
To lower flood heights 
-
-
- 
Increase channel capacities to decrease 
flood heights 
Through Grand and Six Mile Lakes 
Fresh water distribution from Atchafalaya 
River to Teche-Vermilion Basins 
Outlet to gulf 
Intercepting drainage channel 
Drainage control structure 
Diversion channel 
Enlargement and realinement 
New channel 
New channel 
New channel 
Enlargement, clearing and snagging 
Enlargement, realinement, clearing 
and snagging 
Fixed elevation weir 
Gated drainage structure 
Gated drainage structure 
Railway, highway, and local road 
bridges, and pipeline crossing 
Flood protection 
Bank protection 
Authorized by Public Law 81-516 
Authorized by Public Law 81-516. 
Eliminated by Public Law 89-298. 
1230 
40 
60 
87

MISSISSIPPI RIVER COMMISSION 
TABLE 42-B (Cont'd) MISSISSIPPI RIVER TRIBUTARY AND OUTLET IMPROVEMENTS 
Mileage 
Above 
Mouth Locality Improvement Remarks 
LOWER RED RIVER, SOUTH BANK, 
RED RIVER LEVEES, LA. 
82-145 Moncla-Hotwells 
Red River-Moncla to Lake Long 
TENSAS BASIN, ARK. AND LA. 
Red River backwater area 
Tensas-Cocodrie area 
Black River, La. 
Larto Lake to Jonesville area 
56 Jonesville, La. 
Ouachita River 
Boeuf and Tensas Rivers and 
tributaries, La. and Ark. 
Boeuf River, La. and Ark. 
Below Bayou Lafourche 
Bayou Lafourche 
151-235 Boeuf River, La. and Ark., above 
Bayou Lafourche 
210-286 Canal 19 
286-296 Canal 19 extension 
Big and Colewa Creeks 
Tributaries of Boeuf River - 
Canal 19 
Fleschmans Bayou 
Caney Bayou 
Big Bayou 
Canal 18 
Kirsch Lake Canal 
Black Pond Slough 
Bayou Macon, La. and Ark. 
0-170 Bayou Macon 
Canal 43 
Canal 81 
Pumping plant and drainage 
structure 
Levee, south bank 
Levees 
Levees, drainage channels, structures, 
and pumping plant 
Levees, drainage channels, and 
structures 
Levees, floodwall, pumping plant, 
and interior drainage 
Levees, drainage channels, and 
structures 
Clearing 
Channel improvement and realignment 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvements 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
To divert flows from Lake Chicot 
Intermittent (sec. 6) 
Modified by Public Law 89-298 
Loop levees (77.7 miles) adjacent to 
Black River 
Portion of levee built under sec. 6 
Monroe to Sandy Bayou and Bawcomville 
(sec. 6). Now incorporated in 
Ouachita River and tributaries project 
for flood control 
Authorized by Public Law 79-526. Public 
Law 81-516 modified requirements of 
local cooperation. 
Authorized by Public Law 79-526. Public 
Law 81-516 modified requirements of 
local cooperation. 
Authorized by Public Laws 78-534 and 
79-526. Public Law 81-516 modified 
requirements of local cooperation. 
Authorized by Public Law 79-526. 
Public Law 81-516 modified requirements 
of local cooperation. 
Authorized by Public Law 85-500. Public 
Law 81-516 modified requirements of 
local cooperation. 
Authorized by Public Law 78-534. Public 
Law 81-516 modified requirements of 
local cooperation. 
Authorized by Public Law 85-500. 
Authorized by Public Law 85-500. 
Authorized by Public Law 79-526. 
Authorized by Public Law 85-500. 
Authorized by Public Law 85-500. 
Authorized by Public Law 85-500. 
Authorized by Public Laws 78-534 and 
79-570. Public Law 81-516 modified 
requirements of local cooperation. 
Authorized by Public Law 79-526. 
Authorized by Public Law 79-526. 
Authorized by Public Law 90-483. 
1231 
3-56 
0-32 
0-56 
0-75 
0-8 
0-7 
0-33 
0-10 
0-9 
0-14 
0-34 
0-35 
Lake 
Chicot

TABLE 42-B (Cont'd) 
REPORT OF THE CHIEF OF ENGINEERS, U.S.. ARMY 1970 
MISSISSIPPI RIVER TRIBUTARY AND OUTLET IMPROVEMENTS 
Mileage 
Above 
Mouth Locality Improvement Remarks 
Tributary of Bayou Macon 
0-6 Rush Bayou 
Tensas River, La. and Ark. 
0-160 Tensas River 
Tributary of Tensas River 
0-16 Mill and Vidal Bayous 
Grant's Canal, La. 
0-0.2 Grant's Canal at Lake Providence 
LOWER ARKANSAS RIVER, 
ARK. 
23-98 Yancopin-Pine Bluff 
35-98 Fletcher Bend, Ark. to Pine Bluff 
48-102 North Little Rock to Gillett 
(below Plum Bayou) 
Grand Prairie Region and Bayou 
Meto Basin, Ark. 
YAZOO BASIN, MISS. 
0-75 Yazoo backwater area 
0-381 Yazoo River below Arkabutla Dam 
75-366 Yazoo River between Yazoo City 
and Prichard 
75-345 Yazoo River between Yazoo City 
and Askew 
45-109 Will M. Whittington auxiliary 
channel 
75 Yazoo City protection 
Rocky Bayou Area 
127 
185 
Belzoni protection 
Greenwood protection 
381 Arkabutla Reservoir 
0-64 Yalobusha River below Grenada 
Reservoir 
64 Grenada Reservoir 
0-24 Tallahatchie River-Little Tallahatchie 
River 
0-26 Little Tallahatchie River below 
Sardis Reservoir 
26 Sardis Reservoir 
0-13 Yocona River below Enid Reservoir 
13 Enid Reservoir 
0-88 Cassidy Bayou below Old Coldwater 
River 
137-260 Upper auxiliary channel 
75-381 Area between main stem and hills 
including Bobo Bayou 
McKinney Bayou 
0-7 Alligator-Catfish Bayous 
Qearing 
Channel improvement 
Channel improvement 
Filling canal 
Levee, south bank 
Revetment 
Levee, north bank 
Water supply and drainage improvements 
Levees and pumping plants 
Channel improvement 
Levees, right bank 
Levees, left bank 
Authorized by Public Law,85-500. 
Authorized by Public Law 78-534. Public 
Law 81-516 modified requirements of 
local cooperation. 
Authorized by Public Law 89-298. 
Authorized by Public Law 81-516 
Authorized by Public Law 81-516 
Including Tallatchie and Colwater Rivers 
Intermittent 
Intermittent 
Floodway channel 
Levee, drainage structure, and pumping 
plant 
Channel clearing and enlargement 
Levee and floodwall 
Levees, channel improvement, drainage 
structures, and pumping plants 
Flood detention and conservation 
Channel improvement 
Flood detention and conservation 
Levees, Panola-Quitman floodway 
Improvement of 7.8 miles was approved 
April 29, 1970 
See Table 42-C 
See Table 42-C 
Channel improvement 
Flood detention and conservation 
Channel improvement 
Flood detention and conservation 
Channel improvement 
Floodway channel 
Levees and channel improvement 
Channel improvement or enlargement 
of pumping plant 
Channel improvement 
See Table 42-C 
See Table 42-C 
Including Moores Bayou, Cutoff Bayou, 
Whiting Lake and outlet 
Authorized by Public Law 79-526. 
Authorized by Public Law 79-526. 
Authorized by Public Law 89-298. 
1232

MISSISSIPPI RIVER COMMISSION 
TABLE 42-B (Cont'd) MISSISSIPPI RIVER TRIBUTARY AND OUTLET IMPROVEMENTS 
Mileage 
Above 
Mouth Locality Improvement Remarks 
0-23 
0-42 
275-290 
YAZOO BASIN, MISS. 
(Continued) 
Bear Creek 
Whiteoak Bayou 
Tallahatchie River, Miss. 
Big Sunflower River, etc. 
0-204 Big Sunflower River 
0-8 
0-28 
0-81 
0-43 
60-79 
0-27 
Mill Creek 
Hushpuckena River 
Quiver River 
Gin and Muddy Bayous, Miss. 
Bogue Phalia 
Little Sunflower River 
153-160 Deer Creek 
0-68 Steele Bayou 
Muddy Bayou 
LOWER WHITE RIVER AND 
BASIN, ARK. 
13-55 Laconia Circle-Old Town Lake 
99-198 Augusta to Clarendon 
122 De Valls Bluff 
143 Des Arc, Ark. 
0-196 Cache River, Ark. 
0-90 Bayou DeView, Ark. 
ST. FRANCIS RIVER AND 
BASIN, ARK. AND MO. 
0-225 Mouth of St. Francis River- 
Wappapello Dam 
225 Wappapello Reservoir 
0-105 Little River Basin 
Marked Tree, Ark. 
Tyronza River 
Big Slough Ditch 
Mayo Ditch 
Channel improvement 
Channel improvement 
Two road crossings of Panola-Quitman 
Floodway, Miss., and for protection 
of Sheley Bridge 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Water-control structure 
Levee, backwater including outlet 
Pumping plant 
Levees, outlet structures 
Levee, outlet structure, and pumping 
station 
Levee, outlet structure, and pumping 
station 
Channel improvement and structures 
Channel improvement and structures 
Floodway, levees, drainage channels, 
and structures. 
Flood detention and conservation 
Floodway, levees, drainage channels, 
and structures 
Marked Tree Siphon 
Channel improvement 
Channel improvement 
Channel improvement 
Authorized by Public Law 89-298. 
Authorized by Public Law 89-298. 
Authorized by Public Law 90-147. 
Authorized by Public Law 79-526. 
Public Law 81-516 modified requirements 
of local cooperation. 
Authorized by Public Law 87-874. 
Authorized by Public Law 79-526. Public 
Law 81-516 modified requirements of 
local cooperation. 
Authorized by Public Law 79-526. Public 
Law 81-5.16 modified requirements of 
local cooperation. 
Authorized by Public Law 79-526. Public 
Law 81-516 modified requirements of 
local cooperation. 
Authorized by Public Law 79-526. Public 
Law 81-516 modified requirements of 
local cooperation. 
Structure, to regulate flows in and out of 
Eagle Lake to minimize fishery losses, 
was approved March 3, 1970. 
Mile 605-645 Mississippi River. 
Authorized by Public Law 85-500. 
Authorized by Public Law 81-516. 
Authorized by Public Law 81-516. 
Authorized by Public Law 81-516. 
See Table 42-C. 
1233 
86 
0-36 
0-29 
0-17

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 42-B (Cont'd) MISSISSIPPI RIVER TRIBUTARY AND OUTLET IMPROVEMENTS 
Mileage 
Above 
Mouth Locality Improvement Remarks 
ST. FRANCIS RIVER AND BASIN, 
ARK. AND MO. (Continued) 
Cross County Ditch 
Belle Fountain Ditch 
Drainage District No. 17 
L'Anguille River, Ark. 
0-108 L'Anguille River and tributaries, 
Brushy and First Creeks 
WEST TENNESSEE TRIBUTARIES 
Wolf River and tributaries, Tenn. 
Obion River and tributaries, North, 
South, Middle, and Rutherford 
Forks 
Forked Deer River and tributaries, 
North, Middle, and South Forks. 
REELFOOT LAKE AREA, KY. 
AND TENN. 
Running Reelfoot Bayou, Tenn. 
Bayou du Chien, Ky. and Tenn. 
ST. JOHNS BAYOU, MO. 
New Madrid-Sikeston Ridge 
WEST KENTUCKY TRIBUTARIES 
Obion Creek 
LITTLE RIVER DIVERSION 
CHANNEL, MO. 
Delta to Ancell, Mo. 
MISSOURI RIVER, MO. 
0-28 Mouth to St. Charles, Mo. 
ILLINOIS RIVER, ILL. 
0-120 Mouth to Havana, Ill. 
OHIO RIVER, ILL. AND KY. 
Cairo to Mound City and 
Mounds, IlL 
0-12 Channel improvement 
Channel improvement 
Channel improvement and pumping 
station 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Levee and floodgate 
Channel improvement 
Levees 
Levees 
Levees 
Floodwall, levee, revetment, and 
pumping plant. 
1. General data concerning Bayou Boeuf, Bayou Sorrel, and Berwick locks where Atchafalaya Basin protection levees cross Gulf Intracoastal 
Waterway, alternate route to Plaquemine, La., and lower Atchafalaya River (extension of Bayou Teche Waterway), respectively, are in 
report of New Orleans District. 
1234 
Authorized by Public Law 90-483. 
Authorized by Public Law 90-483. 
Authorized by Public Law 80-858. 
Authorized by Public Law 85-500. 
Authorized by 1948 Flood Control Act. 
Authorized by 1948 Flood Control Act. 
Authorized by Public Law 83-780. 
Authorized by Public Law 83-780. 
Mile 889, Mississippi River. 
Authorized by Public Law 89-298. 
Mile 49 above Cairo 
Intermittent - (sec. 6) 
Intermittent - (sec. 6) 
0-22 
0-81 
0-75 
0-20 
0-16 
0-11 
0-47

MISSISSIPPI RIVER COMMISSION 
TABLE 42-C MISSISSIPPI RIVER TRIBUTARY DAMS AND RESERVOIRS 
Name I Grenada Enid Sardis Arkabutla Wappapello 
River Yalobusha Yocona Little Tallahatchie Coldwater St. Francis 
Nearest town to damsite Grenada Enid Sardis Arkabutla Wappapello 
Drainage area, square miles 1,320 560 1,545 1,000 1,310 
Conservation pool: 
Area, thousand acres 10 6 11 5 4 
Volume, thousand acre-feet 86 58 108 31 31 
Elevation, feet, mean sea level 193 230 236.0 209.3 354.7 
Flood control pool: 
Area, thousand acres 65 28 58.5 33 23 
Volume, thousand acre-feet 1,252 602 1,462 494 582 
Runoff, inches 17.8 20.2 17.7 9.3 8.4 
Outlet Gates: 
Number 3 2 4 3 3 
Size, feet 7.5 by 14 8 by 16 6 by 12 8.5 by 19 10 by 20 
Capacity, thousand cubic feet per second 10.7 9.4 10.0 10.0 18.0 
Spillway: 
Type, uncontrolled Chute Chute Chute Chute Gravity 
Length, feet 200 200 400 300 740 
Elevation, crest, feet, mean sea level 231 268 281.4 238.3 394.7 
Discharge capacity, thousand cubic 52 50 132 89 229 
feet per second 
Surcharge pool: 
Area, thousand acres 106 41 90 63 32 
Volume, thousand acre-feet 1,385 554 1,447 858 521 
Runoff, inches 19.7 18.5 17.6 16.1 7.5 
Elevation, feet, mean sea level 247.5 284.0 301.0 256.3 413.7 
Dam: 
Type, earthfill Rolled Rolled Hydraulic Rolled Rolled 
Length, thousand feet 13.9 8.4 15.3 10.0 2.7 
Elevation, crest, feet, mean sea level 256.0 293.0 311.4 264.3 419.7 
1. Grenada, Enid, Sardis, and Arkabutla Reservoirs are in Yazoo River Basin, Miss.; Wappapello Reservoir is in St. Francis River Basin, Mo. 
1235

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Acts Work Authorized 
May 15, 1928 
June 19, 1930 
Feb. 15, 1933 
April 23, 1934 
June 15, 1936 
June 15, 1936 
Aug. 28, 1937 
June 28, 1938 
Aug. 18, 1941 
Dec. 22, 1944 
July 24, 1946 
June 30, 1948 
May 17, 1950 
Documents 
1236 
TABLE 42-D 
Flood protection in alluvial valley of Mississippi River, revetment 
and contraction works and dredging to provide least 
channel depth of 9 feet and width of 300 feet below Cairo. 
White River backwater 
Morganza Floodway, outlet west of Berwick, Atchafalaya 
Basin; control of headwater floods, St. Francis and Yazoo 
Basins; Mounds to Mound City levee; flood-control works 
along Cache River, Ill., roads on levees and drainage 
adjustments incident to floodway levees. 
Enlarge main line levees to offset abandonment of floodways 
between Arkansas and Red Rivers, flood-control works in 
backwater areas of Yazoo and Red Rivers, and in Bayous 
Rapides, Boeuf, and Cocodrie, La. 
Navigation channel 12 feet deep and 300 feet wide between 
Baton Rouge and Cairo; flood protection of Yazoo River backwater 
area in vicinity of Satartia. 
Continue prosecution of channel improvement and stabilization 
program, $200 million. 
Improve Boeuf and Tensas Rivers and Bayou Macon 1 
Big Sunflower River, etc.1 
Improve Bayou Lafourche. 
Improve Yazoo River tributaries. 
North bank, Arkansas River levees (below Plum Bayou).' 
Levees on White River (Augusta to Clarendon). 1 
Bayou des Glaises diversion channeL1 
Modify local cooperation requirements in St. Francis and Yazoo 
Basins. 
Tiptonville-Obion levee and drainage improvements. 
Improvement of St. Johns Bayou, Mo. 
Tennessee Chute (Memphis Harbor). 
Continue prosecution of project for flood control and channel 
improvement, $100 million. 
Improve Mississippi River below Cape Girardeau, Mo., with respect 
to West Tennessee tributaries. 
Improve L'Anguille River, Ark. 
Baton Rouge Harbor (Devils Swamp), La. 1 
Flood protection at Des Arc, Ark. 
Improve St. Francis River and Basin, Ark., and Mo. 
Improve Cache River and Bayou DeView, Ark., and Mo. 
Improve Grand Prairie Region and Bayou Meto Basin, Ark. 
Flood protection, Lake Pontchartrain, Jefferson Parish, La. 1 
Filling Grant's Canal. Lake Providence, La. 
Additional protection to Red River backwater area. 
Extend Federal jurisdiction to cover levees in Orleans 
Parish, La. 
Bank protection, Amite River, La. 
Continue prosecution of project for flood control and 
channel improvement, $200 million. 
H. Doc. 90, 70th Cong., 1st sess. 
Unpublished report April 2, 1925 
H. Committee on Flood Control 
Doc. 1, 74th Cong., 1st sess.; 
H. Committee on Flood Control 
Doc. 1, 75th Cong., 1st sess. 
H. Doc. 359, 77th Cong., 1st 
sess. 
H. Doc. 509, 78th Cong., 2d 
sess., Public Law 534, 77th 
Cong., 1st sess. 
H. Doc. 509, 78th Cong., 2d 
sess., Public Law 534, 77th 
Cong., 1st sess. 
S. Doc. 151, 78th Cong., 2d sess. 
H. Doc. 516, 78th Cong., 2d sess. 
S. Doc. 191, 79th Cong., 2d sess. 
H. Doc. 516, 78th Cong., 2d sess. 
H. Doc. 308, 74th Cong., 1st 
sess. 
H. Doc. 98, 76th Cong., 1st sess. 
H. Doc. 602, 79th Cong., 2d sess. 
Public Law 526, 79th Cong., 2d 
sess. 
H. Doc. 757, 79th Cong., 2d sess. 
H. Doc. 138, 80th Cong., 1st 
sess. 
S. Doc. 51, 80th Cong., 1st sess. 
H. Doc. 627, 80th Cong., 2d sess. 
H. Doc. 651, 80th Cong., 2d sess. 
H. Doc. 321, 80th Cong., 1st 
sess. 
H. Doc. 485, 81st Cong., 2d ses. 
H. Doc. 132, 81st Cong., 1st 
sess. 
S. Doc. 88, 81st Cong., 1st sess. 
H. Doc. 255, 81st Cong., 1st 
sess. 
S. Doc. 139, 81st Cong., 2d sess. 
Public Law 516, 81st Cong., 2d 
sess. 
Public Law 516, 81st Cong. 2d 
sess. 
Public Law 516, 81st Cong., 2d 
sess. 
Public Law 516, 81st Cong., 2d 
sess. 
Public Law 516, 81st Cong., 2d 
sess.

TABLE 42-D (Cont'd) 
Acts 
Oct. 30, 1951 
Sept. 3, 1954 
July 3, 1958 
July 3, 1958 
July 14, 1960 
Oct. 23, 1962 
June 18, 1965 
Oct. 27, 1965 
Nov. 7, 1966 
Nov. 20, 1967 
1237 
MISSISSIPPI RIVER COMMISSION 
AUTHORIZING LEGISLATION 
Work Authorized 
Jonesville, La., levee, retaining wall, and drainage 
structure. 1 
Modify requirements for local cooperation in White River 
backwater area, Ark. 
Navigation improvement of Atchafalaya from Mississippi River 
to Morgan City. 
Modify project for Vicksburg-Yazoo area, Miss. 
Improve New Madrid Floodway, Mo. 
Control of Old and Atchafalaya Rivers and a lock for 
navigation. 
Improve Reelfoot Lake area, Ky. and Tenn. 
Improve Greenville Harbor, Miss. 
Extensions to project for Boeuf and Tensas Rivers and Bayou 
Macon in Arkansas. 
White River backwater area-pumping plant. 
Wolf River and tributaries for flood protection. 
Continue prosecution of project for channel improvement- 
$50 million. 
Modification-Baton Rouge Harbor (Devils Swamp). La. 
Construct improvements in Gin and Muddy Bayous, Yazoo 
River Basin, Miss. 
Replace 2 bridges with adequate floodway over Boeuf River and 
Big Bayou in Boeuf Basin, Ark. 
Continue prosecution of project for flood control and channel 
improvement, $53 million. 
Modify and expand levees and channel improvement features of 
main stem project. 
Modify flood control improvements in following tributary areas 
and basins: Cairo-Mounds-Mound City, St. Francis, Lower 
White, Boeuf-Tensas-Macon, Red River backwater, Yazoo headwater, 
Grand Prairie, and Bayou Meto. 
Acquire any modified easements required in New Madrid Floodway 
as provided by sec. 4 of May 15, 1928 act. 
Operate and maintain pumping plant in Red River backwater 
area. 
Provide improvements in West Kentucky tributaries. 
Provide fish and wildlife facilities in St. Francis and Big 
Sunflower Basins; Yazoo headwater and backwater areas; and 
Mississippi Delta region. 
Deauthorize Amite River, La., project 
Modify St. Francis River, Mo., and Ark., project within 
District No. 7, Poinsett County, Ark. 
Construction of improvements to supplement fresh water 
supply in Teche-Vermilion Basins. 
Bank revetment for protection of existing industrial facilities 
along the Mississippi River below Baton Rouge, La. 
Modification of the West Tennessee tributaries feature to 
provide for relocation of gas transmission lines at Federal 
expense. 
Continue emergency work, $87,135,000 which includes 
$100,000 for road crossing of Panola-Quitman Floodway, 
Miss., and $80,000 for protection of Sheley Bridge, 
Tallahatchie River, Miss. 
Documents 
S. Doc 117, 81st Cong., 1st 
sess. 
Public Law 237, 82d Cong., 1st 
sess. 
S. Doc. 53, 82d Cong., 1st sess. 
H. Doc. 85, 83d Cong., 1st sess. 
H. Doc. 183, 83d Cong., 1st sess. 
H. Doc. 478, 83d Cong., 2d sess. 
S. Doc. 160, 83d Cong., 2d sess. 
S. Doc. 15, 86th Cong., 1st sess. 
IH. Doc. 108, 85th Cong., 1st 
sess. 
S. Doc. 26, 85th Cong., 1st 
sess. 
H. Doc. 76, 85th Cong., 1st 
sess. 
Public Law 86-645. 
Public Law 87-874. 
Public Law 87-874. 
Public Law 87-874. 
Public Law 89-42 
H. Doc. 308, 88th Cong., 2d 
sess. 
H. Doc. 308, 88th Cong., 2d 
sess. 
H. Doc. 308, 88th Cong., 2d 
sess. 
H. Doc. 308, 88th Cong., 2d 
sess. 
H. Doc. 308, 88th Cong., 2d 
se ss. 
H. Doc. 308, 88th Cong., 2d 
sess. 
H. Doc. 308, 88th Cong., 2d 
sess. 
S. Doc. 57, 89th Cong., 1st 
sess. 
H. Doc. 524, 89th Cong., 2d 
sess. 
Public Law 89-789. 
Public Law 89-789. 
Public Law 90-147.

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 42-D (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 13, 1968 Improvements in Boeuf and Tensas Rivers and Bayou Macon H. Doc. 168, 90th Cong., 1st 
Basin to divert flows that would otherwise enter Lake sess. 
Chicot, Ark. 
Improvements in the Belle Fountain ditch and tributaries, Mo., H. Doc. 339, 90th Cong., 2d 
and Drainage District No. 17, Ark. 
1. Incorporated into Mississippi River and tributaries project 
as shown in Table 42-E. 
TABLE 42-E INCORPORATING AND AUTHORIZING LEGISLATION 
For Last 
Full Report 
Act of Authorizing See Annual 
Incorporation Act Description Report for 
July 24, 1946 June 22, 1936 Tiptonville-Obion levee and drainage improvements, Tenn. 1941, p. 943 
July 24, 1946 June 22, 1936 Bayou des Glaises diversion ditch, La. 1946, p. 1029 
July 24, 1946 June 22, 1936 From North Little Rock, Ark., to Gillett, Ark., on north 1946, p. 1053 
bank of Arkansas River (portion below Plum Bayou). 
July 24, 1946 Aug. 18, 1941 White River levees Augusta to Clarendon and De Valls 1946, p. 1083 
Bluff, Ark. 
July 24, 1946 Dec. 22, 1944 Boeuf and Tensas Rivers and Bayou Macon, La. 1945, p. 982 
July 24, 1946 Dec. 22, 1944 Big Sunflower River, etc. 1946, p. 1061 
June 30, 1948 July 24, 1946 Devils Swamp barge channel at Baton Rouge, La. 1948, p. 1059 
(Baton Rouge Harbor) 
May 17, 1950 June 22, 1936 Jonesville, La. 1953, p. 773 
May 17, 1950 July 24, 1946 Lake Pontchartrain-Jefferson Parish, La. 1953, p. 737 
1238

MISSISSIPPI RIVER COMMISSION 
SUMMARY OF PRESENTLY ESTIMATED FEDERAL 
FIRST COST OF AUTHORIZED IMPROVEMENTS 
Project Title 
Completed features 
Mississippi River levees 
Section 6 levees, 1928 Flood Control Act 
Channel improvement 
Baton Rouge Harbor, La. 
Atchafalaya Basin, La. 
Bayou Cocodrie and tributaries, La. 
Old River, La. 
Lower Red River - 
South Bank Red River levees, La. 
Mississippi Delta region, La. 
Teche-Vermilion Basins, La. 
Tensas Basin, La. and Ark. 
Lower Arkansas River, Ark. 
Grand Prairie-Bayou Meto, Ark. 
Yazoo Basin, Miss. 
Lower White River, Ark. 
Cache Basin, Ark. 
St. Francis Basin, Ark. and Mo. 
L'Anguille Basin, Ark. 
West Tennessee tributaries, Tenn. 
Reelfoot Lake, Tenn. and Ky. 
West Kentucky tributaries, Ky. 
TOTAL 
1. Includes Bonnet Carre, Morganza, and New Madrid Floodways; Memphis, Greenville, and Vicksburg Harbors; Lake Pontchartrain; Wolf 
River; completed roads on main stem levees; channel construction works; Atchafalaya River and Basin; Wax Lake Outlet; Charenton Canal; 
Bayou des Glaises diversion channel; Boeuf Basin levees; Grant's Canal; De Valls Bluff, Jonesville, and Des Arc protection works; and miscellaneous 
features. 
TABLE 42-G MISSISSIPPI RIVER MAIN STEM CHANNEL IMPROVEMENTS 
Location Dredging in 1,000 Cubic Yards 
Mileage 
Above Head Channel Revetment 
District of Passes Construction Construction Maintenance Total 
New Orleans 
Baton Rouge Harbor 235 - 133 133 
Smithland crossing 298 - 613 613 
Vicksburg 
Main-stem channel 322-599 400 17,961 18,361 
Greenville Harbor 537 - 497 497 
Vicksburg Harbor 437 - 304 304 
Memphis 
Main-stem channel 608-945 4,647 904 22,574 28,125 
Memphis Harbor 726 - - 576 576 
Total 4,647 1,304 42,658 48,609 
1239 
TABLE 42-F 
Estimated Cost 
$ 164,727,000 
287,000,000 
4,000,000 
1,087,000,000 
4,920,000 
381,000,000 
7,490,000 
75,200,000 
22,000,000 
7,350,000 
7,510,000 
134,200,000 
26,800,000 
57,900,000 
267,000,000 
25,400,000 
47,500,000 
192,000,000 
8,220,000 
20,900,000 
756,000 
2,890,000 
$2,831,763,000

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 42-H BANK REVETMENTS AND DIKES: NEW ORLEANS DISTRICT 
(Built during fiscal year, and operative protection in place June 30, 1970) 
Operations Fiscal Year 1970 
Construction Operative 
New Work Reinforcement Non-Operative June 30, 
Location Above Head Extension Lap Mainte- Since June 30, 1970 
of Passes Bank (Linear (Linear (Linear nance 1969 (Linear 
(Miles) (R or L) Feet) Feet) (Squares)' Feet) (Squares) ' (Squares) (Linear Feet) Feet) 
MISSISSIPPI RIVER 
Standard revetment: 
Lower Childress-Fort Jackson, La. 22 
Buras, La. 25 
Port Sulphur, La. 39 
Jesuit Bend, La. 68 
Third district reach, La. 93 
Algiers Point, La. 95 
Gouldsboro Bend, La. 96 
Gretna Bend, La. 97 
Greenville Bend, La. 100 
Carrollton Bend, La. 104 
Avondale Bend, La. 109 
Kenner, La. 114 
Luling, La. 119 
Good Hope, La. 126 
Lucy, La. 136 
Reserve, La. 138 
St. Alice, La. 165 
Philadelphia Point, La. 183 
New River Bend, La. 185 
White Castle, La. 193 
St. Gabriel, La. 201 
Plaquemine Bend, La. 209 
Missouri Bend, La. 222 
Arlington, La. 227 
Port Allen, La. 231 
Allendale, La. 238 
Springfield Bend, La. 244 
Arbroth, La. 250 
Grand Bay, La. 258 
Bayou Sara, La. 265 
Red Store, La. 269 
Arrow Bend, La. 272 
Boies Point, La. 275 
Morganza, La. 279 
Iowa Point, La. 282 
Brunette Point, La. 285 
Greenwood Bend, La. 289 
Hog Point, La. 296 
Carr Point, La. 304 
Above Old River, La. 305 
Fort Adams, Miss. 308 
Coochie, La. 317 
Palmetto, Miss. 322 
Total New Orleans District, 
Mississippi River 
Dikes: 
None 
OLD RIVER CONTROL 
Standard revetment: 
Inflow channel 
Inflow channel, barge barrier 
protection 
Outflow channel 
Total standard revetment, 
Old River 
R - 
R 3,967 
R 3,510 
R - 
L - 
R - 
R - 
R - 
R - 
L - 
R 7,273 
L - 
R - 
L - 
R 11,916 
L - 
R - 
R 5,379 
L - 
R - 
L - 
R - 
R - 
L - 
R - 
R - 
L - 
R - 
R - 
L - 
R - 
L - 
R - 
R - 
L - 
R - 
L - 
R - 
R - 
R - 
L - 
R - 
L - 
32,045 514 129,674 
315 L - 
315 R - 
315 R - 
317 17,295 
121 16,195 
76 32,349 
- 46,230 
- 17,605 
- 7,124 
- 6,867 
- 7,505 
- 9,185 
- 21,101 
- 7,728 
- 4,960 
- 4,127 
- 19,870 
- 15,015 
22,371 
- 9,089 
- 21,523 
- 14,980 
11,916 
- 6,032 
- 3,492 
- 5,379 
- 22,154 
- 7,282 
- 14,371 
- 29,885 
- 16,193 
- 12,244 
- 3,220 
- 17,940 
- 25,690 
- 13,190 
- 7,090 
- 4,780 
- 7,830 
- 13,600 
- 16,094 
- 20,513 
- 11,375 
- 8,038 
- 14,987 
- 8,673 
- 8,600 
4,800 
- 17,219 
14,660 
- 25,914 
544,606 
1,848 
1,003 
2,847 
1,006 
2,608 
2,296 
6,662 
18,270 
490 3,840 
490 3,840 
2,415 
- 2,785 
6,100 
11,300 
1240 
I

MISSISSIPPI RIVER COMMISSION 
TABLE 42-H (Cont'd) BANK REVETMENTS AND DIKES: NEW ORLEANS DISTRICT 
(Built during fiscal year, and operative protection in place June 30, 1970) 
Operations Fiscal Year 1970 
Construction Operative 
New Work Reinforcement Non-Operative June 30, 
Location Below Mouth Extension Lap Mainte- Since June 30, 1970 
or Red Bank (Linear (Linear (Linear nance 1969 (Linear 
River (R or L) Feet) Feet) (Squares) 
1 
Feet) (Squares) 
1 
(Squares) (Linear Feet) Feet) 
ATCHAFALAYA RIVER 
Standard revetment: 
Mile One, La. 
Legonier, La. 
Simmesport, La. 
McCrea, La. 
Woodside, La. 
Provosty, La. 
Crooked Bayou, La. 
Morgan City, La. 
Total standard revetment, 
Atchafalaya River 
Dikes: 
None 
1
4 
6 
13 
14 
17 
18 
115 
L - 
L - 
R - 
L 3,012 
R 2,380 
L 1,656 
R 1,725 
L - 
- - - 1,121 
S - - 4,563 
- 12,915 - - - 
- 6,570 - - 488 
314 6,616 744 2,998 4,494 
261 9,003 - - 717 
8,773 575 35,104 744 2,998 11,383 
Above Old 
River Confluence 
with 
Atchafalaya 
River 
LOWER RED RIVER 
Standard revetment: 
Turnbull Island, La. 
Naples, La. 
Total standard revetment 
9 L - 
7 R -
- 
- - 798 
- - 681 
-- 1,479 
Above Mouth 
of Red 
River 
RED RIVER 
Standard revetment: 
Dupre, La. 
Egg Bend, La. 
Cologne Bend, La. 
Roxana, La. 
Ryland, La. 
Hudson, La. 
Alexandria Front, La. 
Boyce, La. 
Total standard revetment, 
Red River 
Dikes: 2 
Choctaw Bayou Bend, La. 
Bringol (Egg Bend), La. 
Egg Bend, La. 
Cologne Bend, La. 
Echo, La. 
Richardson, La. 
Alexandria, La. 
Bertrand, La. 
Total dikes, Red River 
84 
91 
92 
99 
104 
115 
122 
143 
72 
90 
91 
92 
94 
95 
122 
140 
R - 
R - 
R - 
R - 
R - 
R - 
R - 
R 1,280 
1,280 
20 - 
20 - 
R - 
R - 
R - 
R - 
R - 
R - 
R - 
R - 
1. Gross squares articulated concrete mattress (100 square feet). 
2. Includes all types of dikes and retards. 
1241 
- 4,150 
- 6,640 
- 7,891 
- 3,012 
- 9,162 
7,768 
- 9,600 
- 3,410 
51,633 
6,205 
6,190 
12,395 
2,690 
2,400 
650 
3,325 
3,925 
1,458 
5,280 
4,548 
24,276 
- 2,000 
- 2,477 
- 900 
- 1,850 
- 1,900 
- 2,700 
- 270 
- 7,630 
19,727

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(Built during fiscal year, and operative protection in place June 30, 1970) 
TABLE 42-I 
Operations Fiscal Year 1970 
Construction Operative 
New Work Reinforcement Non-Operative June 30, 
Location Above Head Extension Lap Mainte- Since June 30, 1970 
of Passes Bank (Linear (Linear (Linear nance 1969 (Linear 
(Miles) (R or L) Feet) Feet) (Squares)' Feet) (Squares)' (Squares) (Linear Feet) Feet) 
MISSISSIPPI RIVER 
Standard revetment: 
Bougere Bend, La. 
Morville, La. 
Natchez Island, Miss. 
Carthage, Miss. 
Natchez Front, Miss. 
Gibson, La. 
Kempe Bend, La. 
Goldbottom, Miss. 
Hardscrabble, La. 
Grand Gulf, Miss. 
Point Pleasant, La.-Miss. 
Lake Karnac, La.-Miss. 
Diamond Point, La.-Miss. 
Reid-Bedford, La. 
Racetrack, Miss. 
Barge Line Terminal, Miss. 
Vicksburg, Harbor, Miss. 
Delta Point, La. 
King's Point - Opposite 
Delta Point, La.-Miss. 
False Point, La. 
Marshall-Brown's Point, La.-Miss. 
Milliken Bend, La. 
Belle Island, La.-Miss. 
Goodrich, La. 
Fitler-Cottonwood, Miss. 
Hagaman, La. 
Ben Lomond, Miss. 
Lake Providence, La. 
Baleshed Towhead-Stack Island, 
Miss.-La. 
Mayersville, Miss. 
Sarah Island-Opossum Chute, 
La.-Miss. 
Carolina, Miss. 
Cracraft, Ark. 
Worthington, Miss. 
Walnut Point, Kentucky Bend, Miss. 
American Cutoff, Miss.-Ark. 
Sunnyside-Lakeport, Ark. 
Vaucluse, Ark. 
Island 84, Ark.-Miss. 
Warfield Point, Miss. 
La Grange Towhead, Miss. 
Spanish Moss, Ark. 
Leland Cutoff, Ark. 
Tarpley Island, Miss. 
Miller Bend, Miss. 
Island 82, Ark. 
Ashbrook Island, Miss. 
Arkansas City-Yellow Bend, Ark. 
Huntington Point, Miss. 
Pair O'Dice, Ark. 
Eutaw-Mounds, Miss. 
Cypress Bend, Ark. 
Catfish Point, Miss. 
Ozark, Ark.-Miss. 
Prentiss, Miss. 
Riverton, Miss. 
Klondike, Ark. 
Victoria Bend-Terrene, Miss. 
Big Island, Ark. 
Smith Point, Miss. 
Dennis, Miss. 
Cessions, Miss. 
Total revetment 
Vicksburg District, 
Mississippi River 
329 
356 
357 
361 
364 
371 
383 
392 
398 
403 
413 
419 
423 
429 
433 
437 
437 
437 
439 
443 
446 
453 
460 
467 
474 
481 
486 
489 
488 
497 
503 
507 
511 
514 
519 
526 
530 
534 
535 
537 
538 
539 
539 
542 
544 
546 
549 
553 
556 
561 
563 
568 
573 
578 
582 
586 
588 
593 
598 
601 
611 
615 
R 1,837 
R - 
R - 
L
L
R - 
R - 
L
R
L - 
R 395 
L - 
R - 
R - 
L
L
L - 
R - 
L - 
R 470 
L
R - 
L - 
R
L - 
R - 
L
R
R 2,060 
L 3,720 
R
L - 
R - 
R - 
L
L
R
R - 
L - 
L
L - 
R
L
R
L
R
R - 
R - 
L - 
R - 
L 1,605 
R - 
L - 
R - 
L - 
L
R - 
L
R
L
L - 
L - 
10,087 
- 7,443 
- - 
- 8,076 
- - 19,695 
620 1,512 1,808 
1,528 8,938 7,086 
2,095 5,710 9,957 
1,325 5,015 - 
- 5,485 1,881 5,475 - 
- 13,746 271 581 - 
- - 1,285 3,398 1,767 
- - 803 2,107 4,457 
- 3,645 13,716 - 
360 1,988 - 
- 5,359 3,540 8,233 - 
S3,430 9,539 - 
280 770 1,798 
- - 400 1,007 1,157 
40,109 21,463 67,989 47,725 
1242 
- 20,805 
- 5,730 
2,180 
- 6,180 
- 6,045 
- 9,518 
19,180 
- 23,300 
- 22,530 
- 30,520 
- 29,960 
- 19,260 
12,125 
18,392 
- 13,935 
- 3,040 
- 7,350 
- 7,060 
- 19,330 
- 12,860 
19,580 
- 44,650 
23,160 
- 32,300 
- 28,427 
37,756 
- 10,235 
- 11,600 
- 33,770 
31,462 
16,970 
- 11,080 
- 22,210 
- 8,350 
- 45,653 
- 2,980 
- 33,685 
4,300 
- 13,475 
4,320 
- 9,130 
4,580 
- 1,300 
- 2,000 
- 29,360 
- 3,080 
3,455 
- 40,560 
- 10,045 
- 9,095 
- 29,818 
- 26,585 
- 20,075 
- 22,015 
- 20,315 
- 12,500 
21,120 
- 29,245 
- 16,515 
- 8,800 
14,520 
10,910 
1,070,286

MISSISSIPPI RIVER COMMISSION 
TABLE 42-I (Cont'd) (BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(Built during fiscal year, and operative protection in place June 30, 1970) 
Operations Fiscal Year 1970 
Construction Operative 
New Work Reinforcement Non-Operative June 30, 
Location Above Head Extension Lap Mainte- Since June 30, 1970 
of Passes Bank (Linear (Linear (Linear nance 1969 (Linear 
(Miles) (R or L) Feet) Feet) (Squares) Feet) (Squares)
1 
(Squares)
1 
(Linear Feet) Feet) 
MISSISSIPPI RIVER (Cont'd) 
Dikes: 
Waterproof Bar, La. 379 R - - - - - - - 8,030 
Below Racetrack, Miss. 430 L - - - - - - - 4,419 
Racetrack Towhead, Miss. 431 R - - - - - - - 1,752 
Ajax Bar, Miss. 482 L - - - - - - - 18,844 
Ben Lomond, Miss. 488 L - - - - - - 12,769 
Baleshed Ldg., Miss. 493 L - - - - - - - 7,957 
Wilson Pt., La. 500 R - - - - - - - 3,600 
Cracraft, Ark. 513 R - - - - - - - 3,416 
Leota, Miss. 514 L - - - - - - - 7,091 
Seven Oaks, Ark. 523 R - - - - - - - 5,570 
Walnut Point, Miss. 524.6 L 4,725 - - - - - - 4,725 
Island 84, Ark. 532 L - - - - - - - 4,005 
Leland Bar, Ark.-Miss. 538 R - - - - - - - 14,132 
Leland Neck, Ark. 540 R - - - - - - - 4,175 
Tarpley Cutoff, Miss.-Ark. 540.3 R 3,576 - - - - - - 3,576 
Island 82-Miller Bend, Ark.-Miss. 544 R & L - - - - - - - 12,490 
Ashbrook-Miller Bend, Ark.-Miss. 547 L & R - - - - - - 9,309 
Ashbrook Cutoff, Miss. 549 L - - - - - - - 8,683 
Chicot Ldg., Ark. 564.5 R - - - - - - - 13,055 
Malone Field, Ark. 585 R - - - - - - - 7,086 
Terrene, Miss. 589.5 L - - - - - - - 7,476 
Montgomery Towhead, Ark. 591 R - - - - - - - 6,084 
Smith Point, Miss. 600 L - - - - - - - 4,192 
Island 70, Miss. 608 L - - - - - - - 9,567 
Total dikes, Vicksburg 
District, Mississippi River 8,301 - - - - - - 182,003 
Miles Above 
Mouth 
ARKANSAS RIVER 
Standard revetment: 
Menard Bend, Ark. 31 L - - - - - - - 11,770 
Como, Ark. 34 R - - - - - - - 11,720 
Morgan Bend, Ark. 36 L - - - - - - - 5,250 
Total standard revetment, 
Arkansas River - - - - - - - 28,740 
Dikes: 
Hopedale Cutoff, Ark. 30 R - - - - - - - 1,848 
Fletcher Bend, Ark. 39 R - - - - - - - 2,187 
Morgan Bend, Ark. 36 L - - - - - - 1,995 
Total dikes, Arkansas River - - - - - - - 6,030 
1. Gross squares articulated concrete mattress (100 square feet). 
2. See report on Arkansas River and tributaries, Ark. and Okla., under Little Rock District. 
1243

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(Built during fiscal year and operative protection in place June 30, 1970) 
Operations Fiscal Year 1970 
Construction Operative 
New Work Reinforcement Non-Operative June 30, 
Location Above Head Extension Lap Mainte- Since June 30, 1970 
of Passes Bank (Linear (Linear (Linear nance 1969 (Linear 
(Miles) (R or L) Feet) Feet) (Squares) Feet) (Squares) (Squares)t (Linear Feet) Feet) 
MISSISSIPPI RIVER 
Standard revetment: 
Big Island, Ark. 
Scrubgrass, Ark. 
Henrico, Ark. 
Cessions T.H., Ark. 
Knowlton, Ark. 
Island 67, Miss. 
Ludlow, Ark. 
Rescue Landing, Ark.-Miss. 
Fair Landing, Ark. 
Burke Landing, Miss. 
Island 63 Bar, Miss. 
Island 62, Ark. 
Oldtown Bend, Ark. 
Horseshoe, Miss. 
Westover, Ark. 
Delta-Friars Point, Miss. 
Helena, Ark. 
Trotters Landing, Miss. 
Flower Lake, Miss. 
St. Francis, Ark. 
Harbert Point, Miss. 
Walnut Bend, Ark. 
Mhoon Bend, Miss. 
Peters, Ark. 
Commerce, Miss. 
Porter Lake, Ark. 
Pickett, Ark.-Miss. 
Norfolk-Star, Miss. 
Cow Island Bend, Ark. 
Cow Island Bend (upper), Ark. 
Coahoma, Tenn. 
Ensley, Tenn. 
Dismal Point, Ark. 
Bauxippi-Wyanoke, Ark. 
Presidents Island, Tenn. 
Loosahatchie-Memphis, Tenn. 
Hopefield Point, Ark.-Tenn. 
Loosahatchie Bar, Tenn. 
St. Clair, Ark. 
Island 40, Ark.-Tenn. 
Brandywine, Ark.-Tenn. 
Dean Island, Ark. 
Cedar Point-Densford, Tenn. 
Chute of Island 35, Tenn. 
Lookout Bar, Tenn. 
Lookout, Tenn. 
Sunrise Towhead, Tenn. 
Lower Bullerton, Ark. 
Island 30, Tenn. 
Osceola, Ark. (Rock Groins) 
Osceola, Ark. 
Keyes Point, Tenn. 
Kate Aubrey, Tenn. 
Ashport, Tenn. 
Island 26, Tenn. 
Bend of Island 25, Tenn. 
Barfield, Ark. 
Obion-Tamm, Tenn. 
Huffman-Hickman, Ark.-Tenn. 
Heloise, Tenn. 
Island 18, Mo. 
Linwood Bend, Tenn. 
Blaker Towhead, Tenn. 
Bells Point, Mo. 
Gayoso-Caruthersville, Mo. 
Island 15, Tenn. 
Hathaway Landing, Tenn. 
598 
600 
606 
615 
620 
621 
626 
629 
632 
637 
639 
638 
644 
647 
650 
655 
660 
665 
667 
672 
675 
680 
685 
692 
695 
700 
703 
709 
714 
716 
717 
723 
724 
730 
733 
737 
736 
740 
742 
744 
750 
756 
759 
764 
772 
774 
776 
782 
786 
786 
786 
791 
793 
795 
798 
803 
808 
819 
826 
831 
836 
841 
845 
845 
848 
851 
852 
R - 
R - 
R - 
L - 
R - 
L
R. 
L - 
R
L - 
L 2,210 
R
R
L - 
R
L - 
R
L
L
R
L
R
L
R - 
L
R - 
L - 
L - 
R
R 3,425 
L
L
R
R - 
L
L - 
R - 
R - 
R
R - 
R
R - 
L - 
R - 
R - 
R - 
R
R 1,240 
R
R
R - 
L - 
R
L 2,300 
R
L
R - 
L - 
R - 
L
L - 
L
L 2,700 
R
R - 
L - 
L - 
1,168 4,441 
- - 
65 3,919 
720 13,594 
260 5,252 
190 8, 
190 9, 
2,969 
2,888 
614 
8,683 
1,851 3,571 2,964 
- 4,424 
- - - 
- - 
- - -,42 
,184 - - 
7,044 18,355 
505 - - 
- 3,905 
140 4,935 
- 25,040 
50 8,405 
90 16,900 
- 7,625 
- 10,390 
- 27,020 
- 16,850 
- 19,070 
- 18,820 
- 9,030 
- 25,995 
- 16,385 
- 12,730 
- 30,090 
- 36,460 
- 32,905 
- 12,8904 
- 13,515 
- 8,065 
- 27,220 
- 35,828 
23,690 
- 11,615 
- 33,805 
- 12,575 
- 35,582 
- 22,274 
- 7,003 
- 9,270 
- 36,566 
- 7,200 
- 23,300 
- 12,755 
- 31,293 
115 5,390 
- 2,070 
2,9302 
- 28,450 
50 18,010 
- 7,555 
- 20,190 
- 29,190 
- 2,9902 
- 5,005 
- 13,565 
- 27,320 
- 13,545 
- 1,350 
- 5,823 
- 29,294 
- 2,500 
50 6,778 
- 15,690 
- 22,730 
- 42,040 
- 39,505 
- 26,984 
- 12,935 
- 22,170 
- 14,850 
- 7,057 
- 5,420 
- 25,600 
- 3,895 
- 1,000 
1244 
TABLE 42-J

MISSISSIPPI RIVER COMMISSION 
TABLE 42-J (Cont'd) BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(Built during fiscal year and operative protection in place June 30, 1970) 
Operations Fiscal Year 1970 
Construction Operative 
New Work Reinforcement Non-Operative June 30, 
Location Above Head Extension Lap Mainte- Since June 30, 1970 
of Passes Bank (Linear (Linear (Linear nance 1969 (Linear 
(Miles) (R or L) Feet) Feet) (Squares) Feet) (Squares)' (Squares)' (Linear Feet) Feet) 
MISSISSIPPI RIVER (Cont'd) 
Robinson Bayou, Mo. 
Fritz Landing, Tenn. 
Lee Towhead, Mo. 
Bend of Island 14, Tenn. 
Little Cypress, Mo. 
Merriwether-Cherokee, Tenn. 
Linda, Mo. 
Below Toneys Towhead, Tenn. 
New Madrid Bend, Mo. 
Kentucky Point, Ky. 
New Madrid, Mo. 
LaForge, Mo. 
Slough Landing Neck, Ky.-Tenn. 
Island 9, Ky.-Tenn. 
Chute of Island 8, Ky. 
Bend of Island 8, Mo. 
Island 8, Ky. 
Hickman-Reelfoot, Ky. 
Beckwith Bend, Mo. 
Williams, Ky. 
Wolf Island, Ky. 
Columbus, Ky. 
Belmont, Mo. 
Islands 3 and 4, Ky. 
Campbell, Ky. 
Pritchard, Mo. 
Wickliffe, Ky. 
OHIO RIVER 
Cache-Cairo, Ill. 
Subtotal Memphis District 
MISSISSIPPI RIVER 
Dikes: 
Henrico, Ark. 
Sunflower, Miss. 
Island 64, Ark. 
Island 62, Ark. 
Island 63, Miss. 
Kangaroo Point, Ark. 
Friars Point, Miss. 
Prairie Point, Ark. 
St. Francis TH, Miss. 
Commerce, Miss. 
Basket Bar, Ark. 
Buck Island, Miss. 
Porter Lake, Ark. 
Pickett, Miss. 
Seyppel, Ark. 
Cat Island, Ark. 
Coahoma, Tenn. 
Armstrong, Ark. 
Dismal Point, Ark. 
Hopefield Point, Ark. 
Robinson Crusoe, Tenn. 
Loosahatchie Bar, Tenn. 
Above Loosahatchie, Tenn. 
Redman Point, Ark.-Tenn. 
Randolph Point, Tenn. 
Poker Point, Ark. 
Densford, Tenn. 
Lookout, Ark.-Tenn. 
Kate Aubrey, Tenn. 
Ashport-Golddust, Ark. 
Forked Deer, Tenn. 
Island 25, Ark. 
Below Tamm Bend, Tenn. 
852 
857 
859 
859 
864 
869 
876 
879 
886 
887 
889 
892 
899 
905 
913 
914 
914 
919 
924 
927 
934 
937 
938 
940 
943 
948 
953 
R
L 
L
L
R
L - 
R
L
R
L 4,487 
R
R - 
L - 
L - 
L - 
R
R - 
L 6,010 
R - 
L - 
R 1,990 
L - 
R - 
R 2,020 
L
R - 
L - 
1,700 
- 8,545 - 
- - 
160 15,567 
155 5,315 
177 6,068 
958 R 
26,382 1,917 75,949 10,063 26,367 24,197 
603 
627 
630 
638 
640 
648 
652 
668 
671 
694 
696 
700 
701 
704 
705 
710 
718 
720 
724 
736 
738 
739 
742 
743 
747 
748 
757 
771 
791 
795 
798 
804 
813 
6 
200 
340 
- 225 
- 2,122 
- 4,769 
230 
R - 
L - 
R
R 1,800 
L
R
L - 
R - 
L 3,380 
L - 
R - 
L
R
L - 
R - 
R - 
L - 
R 9,660 
R - 
R
R - 
R - 
L
R - 
L
R - 
R
R - 
R 410 
R 4,740 
L - 
R 5,000 
L 
- 85 
- 60 
- 260 
- 490 
- 230 
- 5,275 
50 
- 11,360 
15,670 
- 8,690 
- 12,050 
- 32,240 
39,815 
- 11,950 
20,895 
- 30,105 
40 4,447 
- 5,559 
30 20,680 
- 28,960 
- 20,075 
- 12,620 
- 9,800 
- 7,725 
41,969 
- 14,588 
7,745 
70 13,265 
- 3,825 
-- 5,785 
- 15,580 
- 6,865 
- 15,045 
- 8,455 
- 22,702 
545 1,597,697
7 
- 6,310 
- 5,520 
- 7,270 
- 13,090 
- 6,120 
- 5,730 
- 6,870 
- 7,430 
- 3,380 
- 5,700 
- 5,090 
- 6,970 
190 7,730 
- 7,180 
- 11,640 
- 9,730 
- 4,260 
- 18,740 
- 19,510 
- 1,330 
- 21,090 
- 3,950 
- 7,550 
- 7,750 
- 16,760 
- 8,430 
- 7,780 
- 5,500 
- 8,620 
- 17,330 
- 8,550 
- 5,000 
- 8,470 
1245 
451-584 0-72-79

TABLE 42-J (Cont'd) 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(Built during fiscal year and operative protection in place June 30, 1970) 
Operations Fiscal Year 1970 
Construction Operative 
New Work Reinforcement Non-Operative June 30, 
Location Above Head Extension Lap Mainte- Since June 30, 1970 
of Passes Bank (Linear (linear (Linear nance 1969 (Linear 
(Miles) (R or L) Feet) Feet) (Squares) Feet)s (Squares) (Squares) (Linear Feet) Feet) 
7 
MISSISSIPPI RIVER (Cont'd) 
Dikes: 
Wrights Point, Ark. 820 R - - - - - - - 12,050 
Island 21 Chute, Tenn. 824 L - - - - - 2,040 - 3,170 
Head of Island 21, Tenn. 828 L - - - - - - - 5,460 
Island 20, Mo.-Tenn. 831 R - - - - - - - 18,080 
Caruthersville-Linwood Bend, Mo. 844 R 4,050 - - - - - - 17,100 
Hathaway, Tenn. 854 L - - - - - - - 13,670 
Below Cherokee, Tenn. 866 L 5,620 - - - - - - 5,620 
Stewart T.H, Mo. 871 R 5,330 - - - - - - 18,290 
Ruddles Point, Mo. 874 R - - - - 700 - 8,040 
Island 9, Ky. 906 L - - - - - - - 7,0108 
Campbell, Ky. 942 R 2,610 - - - - - - 2,610 
Pritchard, Mo. 944 R 4,870 - - - 1,154 - 9,280 
Island 1, Ky. 948 L 5,900 - - - - 250 - 14,960 
Total Dikes 
Memphis District 53,370 - - - - 18,480 190 421,720 
1. Gross squares - articulated concrete mattress (100 square feet). 
2. Lumber mattress revetment. 
3. Groins. 
4. 150 feet replaced by major repairs, FY 70. 
5. Stone fill in pile dike. 
6. Linear feet of dike on which repairs were made. 
7. Linear feet of dike to nearest 10 feet. 
8. Linear feet of triangular frame retards and pile dikes. 
1246

MISSISSIPPI RIVER COMMISSION 
TABLE 42-K PROJECT LEVEES: NEW ORLEANS DISTRICT 
(Present condition of project levees, from Cape Girardeau, Mo., to Head of Passes, La., 
and levee operations for fiscal year 1970 as provided for in Sec. 1 of the act of May 15, 1928, as amended.) 
Surfaced Roads on Levees 
Levees and Floodwalls (miles) Berms (miles) S miles 
Built to Approved 
Authorized In Grade and Section In Built Complete In Built Complete 
Location for Place June Total System This June 30, System This June 30, 30, This June 30 When Com- FY 1970 When FY 1970 
System 1970 FY 1971 Completed 
MISSISSIPPI RIVER 
Fifth Louisiana Levee District 
Old River levees 
Old River structures 
Atchafalaya Basin Levee District 
Levees 
Morganza structure 
Morganza tie-in levees riverward of 
structure 
Port Allen lock 
Plaquemine lock 
Lafourche Basin Levee District 
Levees 
Floodwalls 
Buras Levee District 
Levees 
Floodwalls 
Pontchartrain Levee District 
Levees 
Bonnet Carre levees 
Bonnet Carre structure 
Lake Borgne Basin Levee District 
Levees 
Orleans Levee District 
Levees 
Floodwalls 
Grand Prairie Levee District 
Levees 
Floodwalls 
Total Mississippi River 
LAKE PONTCHARTRAIN, LA. 
Lake Pontchartrain, La. 
Lake Pontchartrain levees 
LOWER RED RIVER - SOUTH BANK 
RED RIVER LEVEES 
Lower Red River - South Bank, Red 
River Levees 
Hotwells to Moncla, La. 
ATCHAFALAYA BASIN FLOODWAY 
Atchafalaya Basin Floodway 
East Bank Atchafalaya River 
Bayou des Glaises 
West Bank Atchafalaya River 
Simmesport Ring 
Melville Ring 
Krotz Springs Ring 
Mansura Hills to Hamburg 
(15,5) (15.5) (0) (15.5) 
14.5 14.5 0 14.5 
1.0 1.0 0 1.0 
(118.2) (118.2) 0 (118.2) 
110.1 110.1 0 110.1 
0.8 0.8 0 0.8 
6.8 6.8 0 6.8 
0.3 0.3 0 0.3 
0.2 0.2 0 0.2 
(120.0) (120.0) 0 (93.8) 
120.0 120.0 0 93.8 
2 0 0 0 
(33.9) (33.9) 0 (3.4) 
33.9 33.9 0 3.4 
2 0 0 0 
(137.1) (137.1) (0) (121.7) 
123.8 123.8 0 108.4 
12.0 12.0 0 12.0 
1.3 1.3 0 1.3 
(11.5) (11.5) (0) (5.3) 
11.5 11.5 0 5.3 
(27.5) (27.5) 0 (23.4) 
27.0 27.0 0 22.9 
0.5 0.5 0 0.5 
(36.8) (36.8) (0.8) (20.0) 
36.8 36.8 0.8 20.0 
2 0 0 0 
500.5 500.5 0.8 401.3 
(17.4) (17.4) (0) (17.4) 
17.4 17.4 0 17.4 
(59.8 (59.8) (0) (51.6) 
59.8 59.8 0 51.6 
(147.5) (147.5) (0) (143.2) 
51.2 51.2 0 49.0 
8.1 8.1 0 8.1 
60.7 60.7 0 58.7 
1.6 1.6 0 1.6 
4.1 4.1 0 4.1 
1.7 1.7 0 1.6 
20.1 20.1 0 20.1 
(11.6) (0) (11.6) 
11.6 0 11.6 
0 0 0 
(10.3) (0) (10.3) 
10.3 0 10.3 
0 0 0 
0 0 0 
0 0 0 
0 0 0 
(2.8) (0) (2.8) 
2.8 0 2.8 
0 0 0 
(0.3) (0) (0.3) 
0.3 0 0.3 
0 0 0 
(0.8) (0) (0.8) 
0.8 0 0.8 
0 0 0 
0 0 0 
(0.2) (0) (0.2) 
0.2 0 0.2 
(0) (0) (0) 
0 0 0 
0 0 0 
(0) (0) (0) 
0 0 0 
0 0 0 
26.0 0 26.0 
(0) (0) (0) 
0 0 0 
(5.0) (0) (5.0) 
5.0 0 5.0 
(0.4) (0) (0.4) 
0.3 0 0.3 
0 0 0 
0 0 0 
0 0 0 
0 0 0 
0 0 0 
0.1 0 0.1 
(15.5) (0) (15.5) 
14.5 0 14.5 
1.0 0 1.0 
(116.9) (0) (4.6) 
110.1 0 4.6 
0 0 0 
6.8 0 0 
0 0 0 
0 0 0 
(120.0) (0) (0) 
120.0 0 0 
0 0 0 
(33.9) (0) (8.7) 
33.9 0 8.7 
0 0 0 
(135.8) (0) (0.8) 
123.8 0 0.8 
12.0 0 0 
0 0 0 
(11.5) (0) (0) 
11.5 0 0 
(27.0) (0) (0) 
27.0 0 0 
0 0 0 
(36.8) (0) (0) 
36.8 0 0 
0 0 0 
497.4 0 29.6 
(17.4) (0) (0) 
17.4 0 0 
(59.8) (0) (0) 
59.8 0 0 
(147.5) (0) (11.7) 
51.2 0 0 
8.1 0 0 
60.7 0 0 
1.6 0 0 
4.1 0 0 
1.7 0 0 
20.1 0 11.7 
1247

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 42-K (Cont'd) PROJECT LEVEES: NEW ORLEANS DISTRICT 
(Present condition of project levees, from Cape Girardeau, Mo., to Head of Passes, La., 
and levee operations for fiscal year 1970 as provided for in Sec. 1 of the act of May 15, 1928, as amended.) 
Surfaced Rdads on Levees 
Levees and Floodwalls (miles) Berms (miles) Surfaced Rads on Built to Approved 
Authorized In Grade and Section In In 
Sffoorr JuPnlea c3e0T, otT his Total Syes tem TBhuiisl tCJoumnpe lete Built Complete 30, System This June 30, System June 30, When Coi-FY 1970, When FY 1970 1970 FY 1970 pleted FY 1970 Completed 
West protection levee, Hamburg to 
Berwick Drainage Canal via 
Calumet (127.5) (127.5) (1.0) (76.0) (34.0) (0) (12.5) (126.5) (0) (61.01 
Levees 126.5 126.5 1.0 76.0 34.0 0 12.5 126.5 0 61.0 
Floodwalls 1.0 1.0 0 0 0 0 0 0 0 0 
Levees west of Berwick and the lower 
Atchafalaya River, Berwick drainage 
canal to Charenton drainage 
canal (67.0) (67.0) (0) (48.9) (3.0) (0) (3.0) (67.0) (0) (10.4) 
Levees 58.1 58.1 0 40.0 3.0 0 3.0 58.1 0 1.5 
Morganza upper guide levee 8.95 8.95 0 8.9 0 0 0 8.9 0 8.9 
East protection levee, Morganza to 
Cutoff Bayou, including 19.4 
miles of Morganza lower guide 
levee (107.2) (107.2) (5.0) (81.0) (53.0) (4.0) (41.4) (105.5) (0) (31.01 
Levees 105.5 105.5 5.0 80.9 53.0 4.0 41.4 105.5 0 31.0 
Floodwalls 1.7 1.7 0 0.1 0 0 0 0 0 0 
Total Atchafalaya Basin and 
Floodway 449.2 449.2 6.0 349.17 90.4 4.0 57.3 446.5 0 114.1 
Combined Total 1,026.9 1,026.9 6.8 819.47 121.4 4.0 88.3 1,021.1 0 143.7 
1. Subject to change as planning progresses. 
2. Length of floodwall indeterminate at this time as planning is 
incomplete. 
3. Based on approved section, 20-foot crown, 1 on 4 side slopes. 
4. Does not include approximately 40 miles of existing roads on 
levees not completed to approved grade and section. 
5. Does not include approximately 3.0 miles of Morganza upper 
guide levee between Mississippi River levee and junction of guide levee 
with Morganza control structure levee. 
6. Does not include approximately 15 miles of existing roads on 
levees not completed to approved grade and section. 
7. Includes 133.0 miles to grade, but deficient in cross section. 
1248

TABLE 42-L 
MISSISSIPPI RIVER COMMISSION 
PROJECT LEVEES: VICKSBURG DISTRICT 
(Present condition of project levees, from Cape Girardeau, Mo., to Head of Passes, La., 
and levee operations for fiscal year 1970 as provided for in sec. 1 of the act of May 15, 1928, as amended.) 
Surfaced Roads on Levees 
Levees and Floodwalls (miles) Berms (miles) (miles) 
Built to Approved 
Location Grade and Section In System Built Complete In System Built Complete 
Authorized In Place This Total When This June 30, When This June 30, 
for System June 30, 1970 FY June 30, 1970 Completed
1 
FY 1970 Completed FY 1970 
MISSISSIPPI RIVER 
Lower Yazoo 178.32 178.3 178.32 305.6 - 108.3 173.5 0.0 81.2 
Greenville Harbor dikes 7.8 7.8 - 7.8 - - 
West bank in Arkansas 75.6 75.6 - 75.6 101.8 - 40.1 75.4 0.0 70.2 
West bank in Louisiana 
(above Red River) 198.7 173.7 - 173.7 219.4 3.8 128.0 198.4 0.0 152.0 
Total Mississippi River 460.4 435.4 - 435.4 626.8 3.8 276.4 447.3 0.0 303.4 
YAZOO RIVER BASIN 
Headwater 574.63 255.74 2.2 255.74 - - - - - - 
Backwater 97.55 12.0 - 12.0 - - - - - 
Total Yazoo River Basin 672.1 267.7 2.2 - - - - - 
ARKANSAS RIVER, ARK. 
North bank 61.56 56.2 - 56.2 10.0 0.0 10.0 47.4 - 47.4 
South bank 85.4 85.4 - 85.4 63.9 0.0 50.1 84.1 - 81.3 
Total Arkansas River 146.9 141.6 - 141.6 73.9 0.0 60.1 131.5 - 128.7 
RED RIVER BACKWATER 
LEVEES 
Total Red River backwater 235.0 119.7 2.5 113.77 - - - 157.1 9.5 82.2 
1. Subject to change as planning progress. 
2. Includes 1.4 miles of concrete levee wall and 0.3 mile earth levee on 
Vicksburg city front. 
3. Includes 33.1 miles of local protection works; 117.3 miles along 
auxiliary channels; 265.6 miles along the main stem; 158.6 miles on 
tributaries. 
4. Includes 27.2 miles of local protection works; 61.3 miles along auxiliary 
channels; 148.3 miles along the main stem; 189 miles on tributaries. 
5. Includes 1 mile of highway embankment. 
6. Includes 5.3 miles for Gillett new levee. 
7. Does not include 2.1 miles of high ground where no levee was required. 
1249

TABLE 42-M 
REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
PROJECT LEVEES: MEMPHIS DISTRICT 
(Present condition of project levees, from Cape Girardeau, Mo., to Head of Passes, La., 
and levee operations for fiscal year 1970 as provided for in sec. 1 of act of May 15, 1928, as amended.) 
Surfaced Roads on Levees 
Levees and Floodwalls (miles) Berms (miles) (miles) 
Built to Approved 
Location Grade and Section In System Built Complete In System Built Complete 
Authorized In Place This Total When This June 30, When This June 30, 
for System June 30, 1970 FY June 30, 1970 Completed' FY 1970 Completed FY 1970 
MISSISSIPPI RIVER 
Mounds, IlL 
Mound City, IlL 
Cairo Drainage District 
City of Cairo 
Little River Drainage 
District, Mo. 
Levee District #2, Scott 
County, Mo. 
Levee District #3, 
Mississippi Co., Mo. 
St. Johns Levee and 
Drainage District, Mo. 
St. Francis Levee District 
of Missouri 
City of Hickman, Ky. 
Fulton County Levee Dist. 
of Fulton Co., Ky. 
Reelfoot L D. of Lake and 
Obion Cos., Tenn. 
Madrid Bend Levee District 
Lake County Levee and 
Drainage District 
Dyer County Levee and 
Drainage District #1 
Tiptonville-Obion levee 
extension 
St. Francis Levee District 
of Arkansas 
Helena Improvement 
District #1 
Cotton Belt Levee District 
No. 1 
Laconia Drainage & Levee 
Dist. of Phillips Co., Ark. 
Laconia L. D. #1 of Desha 
Co., Ark. 
Laconia Circle Special D. D. 
of Desha Co., Ark. 
Yazoo-Mississippi Delta 
L D. 
New Madrid, Mo.; St. Johns 
L. & D. D. 
Birds Point-New Madrid 
setback levee 
Total Mississippi River 
ST. FRANCIS RIVER 
East bank 
West bank 
Total St. Francis River 
3.9 
2.7 
13.81 
6.2 
19.3 
13.8 
26.0 
58.72 
55.7 
1.4 
16.7 
4.5 
9.6 
15.9 
21.3 
6.5 
156.7 
5.3 
23.9 
20.5 
18.1 
6.6 
93.6 
0.3 
35.3 
636.3 
159.5 
148.7 
308.2 
3.9 
2.7 
13.8 
6.2 
19.3 
13.8 
26.0 
58.7 
55.7 
1.4 
16.7 
4.5 
9.6 
15.9 
21.3 
156.7 
5.3 
23.9 
20.5 
18.1 
6.6 
93.6 
35.3 
629.5 
151.2 
146.7 
297.9 
- 3.9 
- 2.7 
-- 13.8 
- 6.2 
-- 19.3 
- 13.8 
15.6 
- 14.0 
- 55.7 
- 1.4 
-- 16.3 
-- 0.1 
- 9.6 3 
- 15.9 
- 21.3 
1.3 152.7 
- 5.3 
- 19.5 
- 20.5 
- 16.4 
- 93.6 
- 35.3 
1.3 552.9 
0.6 151.2 
- 146.7 
0.6 297.9 
-- - 3.6 - 
- - - 1.1 - 
2.8 - - 8.5 - 
0.9 - 0.9 4.0 - 
2.4 - 2.4 19.3 - 
- - - 13.8 - 
- - -15.6 - 
- - - 26.3 - 
18.3 - 8.9 55.1 - 
- - - 0.5 - 
14.6 - 10.6 16.7 - 
0.3 - 0.3 4.5 - 
5.2 - 4.5 15.9 - 
1.5 - - 21.5 - 
- - - 6.5 - 
65.5 1.7 58.9 156.7 1.3 
2.4 - 2.4 4.7 - 
16.4 - 10.6 23.9 - 
8.4 - 8.4 20.5 - 
10.6 - 10.6 18.1 - 
- - - 6.6 - 
88.9 - 85.7 93.6 - 
- - - 0.3 - 
- - - 35.3 - 
238.2 1.7 204.2 572.4 1.3 
8.2 
8.2 
156.7 - 
144.3 - 
301.0 - 
1250 
3.6 
1.1 
8.5 
3.5 
19.3 
13.8 
15.6 
9.9 
55.1 
16.3 
15.9 
21.3 
95.5 
4.2 
8.0 
13.8 
16.5 
93.6 
35.3 
450.8 
15.1 
15.7 
30.8

MISSISSIPPI RIVER COMMISSION 
PROJECT 42-M (Cont'd) PROJECT LEVEES: MEMPHIS DISTRICT 
(Present condition of project levees, from Cape Girardeau, Mo., to Head of Passes, La., 
and levee operations for fiscal year 1970 as provided for in sec. 1 of act of May 15, 1928, as amended.) 
Surfaced Roads on Levees 
Levees and Floodwalls (miles) Berms (miles) (miles) 
Built to Approved 
Location Grade and Section In System Built Complete In System Built Complete 
Authorized In Place This Total When This June 30, When This June 30, 
for System June 30, 1970 FY June 30, 1970 Completed FY 1970 Completed FY 1970 
LITTLE RIVER DRAINAGE 
East bank (left) 40.7 40.7 - 40.7 - - - 40.7 - 
West bank 35.1 35.1 - 35.1 - - 35.1 - - 
Elk Chute 39.9 39.9 - 39.9 - - - 39.7 - - 
West Basin and middle 
valley 14.4 14.4 - 14.4 - - - 13.4 - 5.6 
Total Little River 130.1 130.1 - 130.1 - -- 128.9 - 5.6 
LOWER WHITE RIVER 
White River backwater levee 40.2 40.2 - 40.2 - - 38.8 -, 38.8 
Augusta to Clarendon 49.2 39.5 - 39.5 - - - - - 
Clarendon levee 6.2 6.2 - - - - - 
MEMPHIS HARBOR 
Memphis Harbor 10.5 10.5 - 10.5 4.3 - 1.5 10.5 - 10.5 
1. Includes 5.1 miles of Cache River levee. This levee was enlarged to 
1928 grades with Federal funds, but since that time has been classified as a 
secondary levee. 
2. Includes 12.1 miles of Farrenburg levee. This levee was enlarged to 
1928 grades with Federal funds, but since that time has been classified as a 
secondary levee. 
3. This levee has not been authorized to be built to project grade and 
section. 
1251

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
LEVEES: YARDAGE AND OPERATIONS 
(As provided for in Sec. 6, Flood Control Act of 1928, as amended.) 
Miles Operations, 
Miles in Miles Built to Fiscal Year 1970 
System Built Approved Contents Contents Required 
When June 30, Grade and June 30, New Lost or June 30, to 
Completed 1970 Section 1969 Work Abandoned 1970 Complete 
MISSISSIPPI RIVER 
St. Louis District 
Clemens Station, Mo., to mouth 
of Missouri River 
Mouth of Illinois River to Prairie 
du Pont, Ill. 
Prairie du Pont, Ill., to Grand 
Tower, Ill. 
Mouth of Missouri River to 
Cape Girardeau, Mo. 
Grand Tower, Dl., to Thebes, IlL 
Rock Island District 
Rock Island to New Boston, IlL 
Total Mississippi River 
MISSISSIPPI RIVER TRIBUTARIES 
New Orleans District 
RED RIVER 
Moncla to Lake Long, La. 
Vicksburg District 
OUACHITA RIVER 
East bank below Monroe, La. 
West bank: 
Bawcomville, La. 
Harrisonburg to Little River, La. 
Total Ouachita River 
YAZOO RIVER 
West bank 
Memphis District 
WHITE RIVER 
Horn Lake, Ark. 
St. Louis District 
ILLINOIS RIVER 
Havana, Ill., to Beardstown, Ill. 
Beardstown, Ill., to mouth of 
Illinois River 
Total Illinois River 
Total Sec. 6 Levees 
28 28 
20 20 
4 4 
46 46 
31.4 31.4 
129.4 129.4 
20.7 20.7 
68.5 64.71 
1,000 1,000 1,000 
Cubic Cubic Cubic 
Yards Yards Yards 
25.6 - - 
- 27.1 - 
- 57.2 
3 1,252.4 
31.4 4,485.0 - - 
34.4 5,847.3 
20.7 394 
64.71 3,7372 
3.1 3.1 3.1 283 - - 
12.4 12.4 12.4 6823 - - 
84.0 80.2 80.2 4,702 
1,000 1,000 
Cubic Cubic 
Yards Yards 
25.6 
27.1 
57.2 
1,252.4 
4,485.0 
1,000 
Cubic 
Yards 
- 5,847.3 - 
394 - 394 
X737 500 4,237 
283 - 283 
682 - 682 
4,702 500 5,202 
8.7 8.7 8.7 735 735 
1.8 1.8 1.8 50.1 
25 25 
50.1 
8 1,610 
166 166 127 15,940 
191 191 135 17,550 
435.6 431.8 280.8 29,278.4 
- 735 
- 50.1 
1,610 
15,940 
17,550 
28,962.9 
1. Includes 1.3 miles constructed by local interests. 
2. Includes 115,000 cubic yards constructed by local interests. 
3. Includes about 95,000 cubic yards constructed by local interests. 
1252 
TABLE 42-N 
Location of Levee 
Estimated 
Final 
Contents

MISSISSIPPI RIVER COMMISSION 
TABLE 42-0 CHANNEL IMPROVEMENTS: NEW ORLEANS DISTRICT 
(New work accomplished during fiscal year and 
operative portion of project feature in place June 30, 1970.) 
In Project When Complete Completed June 30, 1970 Operations During FY 1970 
Location of Year Exca- Clean Exca- Clean Exca- Clean Percent 
Improvement Initiated Total vation Out Total vation Out Total vation Out Complete 
1,000 1,000 1,000 
Cubic Cubic Cubic 
Miles Yards Miles Miles Yards Miles Miles Yards Miles 
Bayou des Glaises diversion 
channel 
Bayous Rapides, Boeuf, 
and Cocodrie 
Charenton drainage and 
navigation canal 
Wax Lake Outlet 
Atchafalaya Basin 
Floodway 
Morganza Floodway 
Old River outflow 
channel 
Old River inflow 
channels 
Old River lock approach 
channel 
Baton Rouge Harbor 
(Devils Swamp) 
1938 
1946 
1939 
1938 
1933 
1941 
1956 
1960 
1961 
1958 
6.0 2,223 
92.6 22,039 
6.3 10,879 
15.7 57,546 
244.2 813,418 
3.3 1,322 
7.4 67,449 
0.4 6,182 
2.2 6,731 
5.0 17,075 
- 6.0 2,223 
21.8 63.4 16,483 
- 6.3 10,879 
- 15.7 57,546 
- 186.4 397,857 
- 3.3 1,322 
- 7.4 67,449 
- 0.4 6,182 
- 2.2 6,731 
- 2.5 7,458 
S - - - 100 
12.2 - - - 75 
- - - - 100 
S - - - 100 
- - - - 49 
- - - - 100 
- - - - 100 
- - - - 100 
S - - 100 
- - - - 44 
1253

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
CHANNEL IMPROVEMENTS: VICKSBURG DISTRICT 
(New work accomplished during fiscal year and 
operative portion of project feature in place June 30, 1970.) 
In Project When Complete Completed June 30, 1970 Operations During FY1970 
Location of Improvement Year Exca- Clean Exca- Clean Exca- Clean Percent 
Initiated Total vation Out Total vation Out Total vation Out Complete 
1,000 
Cubic 
Miles Yards Miles Miles 
BIG SUNFLOWER RIVER, 
ETC., MISS. 
Big Sunflower River 1947 199.1 5,912 187.91 199.1 
Quiver River 1947 69.6 2,401 42.04 69.6 
Deer Creek 1947 7.0 73 2.04 7.0 
Steele Bayou 1947 66.9 20,7512 45.40 22.2 
Big Sunflower River 
tributaries 1957 227.4 7,856 173.45 227.4 
Quiver River tributaries 1960 35.4 481 23.08 35.4 
Steele Bayou tributaries 
1959 40.7 5,1112 13.44 - 
YAZOO BASIN HEADWATER, 
MISS. 
Coldwater River 1941 54.6 9,897 43.5 54.6 
Arkabutla Canal 1948 0.4 81 - 0.4 
Tallahatchie River 1940 74.8 7,361 64.8 73.5 
Little Tallahatchie 
River and Panola- 
Quitman Floodway 1939 48.0 1,170 43.0 48.0 
Yocona River 1952 1.8 606 - 1.8 
Bobo Bayou 1944 16.2 2,776 1.9 16.0 
Cassidy Bayou 1943 69.0 10,5382 47.6 - 
Yalobusha River 1939 46.0 6,337 36.1 46.0 
Yazoo River 1941 160.2 5,400 155.6 160.2 
Whittington auxiliary 
channel 1956 30.8 23,520 - 30.8 
Tehula Lake 1964 26.4 2,121 15.4 26.4 
David and Burell 
Bayous 1957 40.4 1,332 28.6 30.5 
McKinney Bayou 1960 3.5 207 2.2 3.5 
Hillside Floodway 1964 11.0 877 4.8 1.6 
Yazoo City protection 
works 1953 1.6 2,457 - 
1,000 
Cubic 
Yards Miles Miles 
5,912 187.91 - 
2,401 31.90 - 
73 2.04 - 
7,377 45.40 3.0 
7,384 170.18 - 
481 23.08 - 
791 13.44 - 
9,897 43.5 - 
81 - - 
5,856 64.8 - 
1,170 43.0 - 
606 - - 
2,776 1.9 - 
3,033 47.6 - 
6,337 36.1 - 
5,400 155.6 - 
23,520 - - 
2,121 15.4 - 
1,032 18.7 - 
207 2.2 - 
240 - - 
1.6 2,457 - 
BOEUF AND TENSAS 
BASINS, ARK. AND LA. 
Bayou Lafourche, La. 1949 44.6 52,1061 1.10 - 
Big and Colewa Creeks, 
La. 1947 75.5 20,1792 ,3 47.21 - 
Tensas River, La. 1947 157.5 19,9421 151.29 27.7 
Boeuf River, Ark. 
and La. 
Fleschmans Bayou, 
1953 103.9 20,937 50.58 103.9 
Ark. 1963 6.6 513 2.70 6.6 
Caney Bayou, Ark. 1964 7.1 406 1.89 7.1 
Canal 18, Ark. 1963 10.3 776 1.59 10.3 
Big Bayou, Ark. 1952 33.3 1,827 14.87 33.3 
Black Pond Slough, Ark. 1962 14.3 947 - 14.1 
35,816 1.10 - - - 
4,375 34.01 - - - 
1,092 86.16 20.7 - - 
20,937 50.58 - - - 
513 2.70 - - - 
406 1.89 - - - 
776 1.59 - - - 
1,827 14.87 - - - 
947 - - - - 
1254 
TABLE 42-P 
1,000 
Cubic 
Yards Miles 
1,055 - 
100 
100 
100 
33 
100 
100 
10 
100 
100 
85 
100 
100 
100 
33 
100 
100 
100 
100 
75 
100 
72 
100 
154 
174 
100 
100 
100 
100 
100 
100
14

MISSISSIPPI RIVER COMMISSION 
TABLE 42-P (Cont'd) CHANNEL IMPROVEMENTS: VICKSBURG DISTRICT 
(New work accomplished during fiscal year and 
operative portion of project feature in place June 30, 1970.) 
In Project When Complete Completed June 30, 1970 Operations During FY 1970 
Location of Improvement Year Exca- Clean Exca- Clean Exca- Clean Percent 
Initiated Total vation Out Total vation Out Total vation Out Complete 
BOEUF AND TENSAS 
BASINS, ARK. AND 
LA. (Cont'd) 
Bayou Macon, Ark. 
and La. 1959 146.4 15,863 110.08 146.4 15,863 110.08 - - - 100 
Rush Bayou, Ark. 1964 6.2 - 6.2 6.2 - 6.73 - - - 100 
Canal 19, Ark. 1957 50.2 11,348 - 50.2 11,348 - - - - 100 
Canal 43, Ark. 1956 34.5 698 24.80 34.5 698 24.80 - - - 100 
Canal 81, Ark. 1957 32.7 4,433 7.01 32.7 4,433 7.01 - - - 100 
Mill Bayou and Bayou 
Vidal - 16.4 - 16.40 - - - - - - - 
Kirsch Lake Canal - 9.3 620 - - - - - - - - 
Canal 19 (Ext.) 1964 9.4 1,040 - 9.4 1,040 - - - - 100 
1. Clearing and snagging accomplished before all cutoffs. 
2. Includes additional improvements as approved by the Chief 
of Engineers (HD-308--88th Cong.) 
3. Does not include approximately 1,500,000 cubic yards of 
channel excavation completed by local interests in the lower 26 
miles of the stream. 
4. For authorized additional enlargement. 
1255

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
CHANNEL IMPROVEMENTS: MEMPHIS DISTRICT 
(New channel improvement work accomplished during fiscal year 
and operative portion of project feature in place June 30, 1970.) 
In Project When Complete Completed June 30, 1970 Operations During FY 1970 
Location of Improvement Year Exca- Clear Exca- Clear Exca- Clear Percent 
Initiated Total vation Out Total vation Out Total vation Out Complete 
1,000 
Cubic 
Miles Yards Miles Miles 
1,000 1,000 
Cubic Cubic 
Yards Miles Miles Yards Miles 
BIRDS POINT-NEW 
MADRID FLOODWAY 
Birds Point-New 
Madrid intercepting 
ditch enlargement, 
Samos and vicinity, 
Mo. 
ST. FRANCIS BASIN 
1952 9.6 285 4.6 9.6 
Little River drainage, 
Mo. 1963 291.5 37,600 - 138.6 
Miss. Co., DD 17, Ark. 1947 15.9 1,068 - 15.9 
St. Francis River, Mo. 
and Ark. 1953 466.8 137,200 49.0 181.0 
West Memphis drainage, 
Ark. 1951 19.8 1,747 2.2 19.8 
Cross County project 
ditch, Ark. 1942 11.8 7,710 - 11.8 
Tyronza River, Ark. 1939 12.7 2,795 - 12.7 
L'Anguille River, Ark. 1 112.0 16,000 23.52 - 
LOWER WHITE RIVER 
BASIN, ARK. 
Cache River Basin, Ark. 
Big Creek and tributaries, 
Ark. 
WEST KENTUCKY 
TRIBUTARIES 
Obion Creek, Ky. 
WEST TENNESSEE 
TRIBUTARIES 
285 4.6 
16,668 
1,068 
0.8 154 - 
- - - 
77,563 12.1 2.2 176 - 
1,747 2.2 - - - 
7,710 - - - - 
2,795 - - - - 
231.5 115,500 9.0 - 
175.1 29,930 - - 
36.9 6,830 - - 
Miss. River, Western 
Tenn. tribs. (Backwater 
area) 1946 Act 1952 34.3 1,883 26.1 34.3 
Reelfoot Lake Area, 
Ky, and Tenn.; Bayou 
du Chien, Ky. and 
Tenn. 13.3 215 - - 
Running Reelfoot 
Bayou, Tenn. 1955 19.7 4,145 - 19.7 
Miss. River below Cape 
Girardeau; West 
Tenn. tribs. (1968 Act) 1961 216.0 57,500 10.3 68.9 
Wolf River and tribs., 
Tenn. 1960 25.5 5,338 - 25.5 
1,883 26.1 - - - 
4,145 - - - - 
26,844 - 4.8 6.0 - 
5,338 - - - - 
1. Not started. 
2. Includes 5.8 miles of cleanout done under St. Francis 
River, Mo. and Ark. 
1256 
TABLE 42-Q 
100 
44 
100 
57 
100 
100 
100 
100 
100 
47 
100

MISSISSIPPI RIVER COMMISSION 
TABLE 42-R COSTS DURING FISCAL YEAR 1970 
Construction Maintenance Other 
FEDERAL FUNDS 
Flood control, Mississippi River and 
tributaries: 
Memphis District: 
General Investigations $ - $ - $ 391,758 
Advance engineering & design 234,528 - - 
Mississippi River'levees 453,439 409,665 - 
St. Francis Basin 4,329,039 1,325,558 - 
Lower White River - 95,046 - 
Channel Improvement 14,490,224 8,654,860 - 
West Tennessee tributaries 193,414 - - 
Inspection of completed works - 80,478 - 
Mapping - 78,421 - 
Subtotal 19,700,644 10,644,028 391,758 
Vicksburg District: 
General Investigations - - 907,948 
Mississippi River levees 484,537 291,321 - 
Lower Arkansas River 8,233 142,536 - 
Tensas Basin 1,826,603 103,291 - 
Jonesville, La. 5,706 - - 
Yazoo Basin 2,720,648 3,551,670 - 
Channel Improvement 8,108,434 6,880,087 - 
Mapping - 79,188 - 
Inspection of completed works - 21,264 - 
Recreation facilities - completed proj. 125,924 -- 
Subtotal 13,280,085 11,069,357 907,948 
New Orleans District: 
General Investigations - 85,769 
Advance engineering & design 187,414 - - 
Mississippi River levees 1,032,802 1,853,057 
Lower Red River 18,227 128,933 - 
Old River 49,190 629,657 - 
Bayou Cocodrie and tributaries - 43,946 - 
Atchafalaya Basin 4,576,810 2,268,784 - 
Channel Improvement 5,582,171 1,983,262 - 
Bonnet Carre - 186,643 - 
Inspection of completed works - 12,523 - 
Mapping - 48,021 - 
Subtotal 11,446,614 7,154,826 85,769 
CONTRIBUTED FUNDS 
Memphis District: 
Little River drainage 362 
New Orleans District: 
Old River - 23,078 
Total contributed funds 362 23,078 - 
Grand Total, Federal and 
contributed funds 44,427,705 28,891,289 1,385,475 
1257

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 42-S STATEMENT OF ALLOTMENTS AND ACCRUED EXPENDITURES (COSTS) 
UNDER APPROPRIATIONS FOR FLOOD CONTROL, MISSISSIPPI RIVER 
AND TRIBUTARIES FROM MAY 15, 1928 THROUGH FISCAL YEAR 1970 
(NEW STRUCTURE EFFECTIVE 1 JULY 1955) 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures June 30, 1970 
ALLOTMENTS AND ACCRUED EXPENDITURES 
CHARGEABLE AGAINST FLOOD 
CONTROL ACT LIMITATIONS: 
COMPLETED WORKS: 
Waterways Experiment Station $ 874,000 $ 874,000 $ - 
Office, Chief of Engineers 19,158 19,158 - 
Rock Island District: 
S. G. & O. prior to August 18, 1941 14,010 14,010 
St. Louis District: 
S. G. & O. prior to August 18, 1941 169,352 169,352 
Subtotal 1,076,520 1,076,520 
Memphis District: 
Des Arc, Ark. 178,925 178,925 
Contraction works 8,692,791 8,692,791 
De Valls Bluff, Ark. 231,215 231,215 
Mapping 1,450,337 1,450,337 
Memphis Harbor 18,736,432 18,736,432 
New Madrid Floodway 6,521,543 6,521,543 - 
Wolf River and tributaries 1 1,723,620 1,723,620 
Roads on levees (Miss. River levees) 12,426 12,426 
S. G. & O. prior to August 18, 1941 1,998,766 1,998,766 
Subtotal 39,546,055 39,546,055 
Vicksburg District: 
Boeuf Basin levees 2,764,605 2,764,605 
Channel realignment, Arkansas River 125,074 125,074 
Contraction works 1,972,183 1,972,183 
Eudora Floodway 826,235 826,235 
Vicksburg Harbor 4,664,515 4,664,515 
Greenville Harbor 2,864,516 2,864,516 
Grants Canal (Miss. River levees) 7,070 7,070 
Mapping 1,531,021 1,531,021 
Jonesville, La. 166,636 166,636 
Roads on levees 105,660 105,660 
S. G. & O. prior to August 18, 1941 2,350,201 2,350,201 
Subtotal 17,377,717 17,377,717 
New Orleans District: 
Atchafalaya River and basin, La. 3,375,492 2,375,492 - 
Bonnet Carre spillway, La. 14,212,198 14,212,198 
Contraction works 1,258,916 1,258,916 
Mapping 1,112,967 1,112,967 
Roads on levees 540,838 540,838 
S. G. & O. prior to August 18, 1941 2,701,566 2,701,566 
Wax Lake Outlet and Charenton Canal 10,098,817 10,098,817 
Morganza Floodway and structure 35,992,117 35,992,117 
Lake Pontchartrain 5,513,110 5,513,110 
Atchafalaya Basin, rights-of-way and 
flowage, bayou des Glaises setback 387,917 387,917 
Subtotal 75,193,938 75,193,938 
All other completed items: 
Surveys under sec. 10, Flood Control Act 
of 1928 4,995,215 4,995,215 - 
Impounded savings 1,593,097 1,593,097 
Plant transferred to revolving fund 24,924,578 24,924,578 - 
OCE (portion of allotment transferred to 
revolving fund, Washington Dist.) 19,882 19,882 
Subtotal 31,532,772 31,532,772 
Total completed works 164,727,001 164,727,001 
1258

MISSISSIPPI RIVER COMMISSION 
TABLE 42-S (Cont'd) STATEMENT OF ALLOTMENTS AND ACCRUED EXPENDITURES (COSTS) 
UNDER APPROPRIATIONS FOR FLOOD CONTROL, MISSISSIPPI RIVER 
AND TRIBUTARIES FROM MAY 15, 1928 THROUGH FISCAL YEAR 1970 
(NEW STRUCTURE EFFECTIVE 1 JULY 1955) 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures June 30, 1970 
ALLOTMENTS AND ACCRUED EXPENDITURES 
CHARGEABLE AGAINST FLOOD 
CONTROL ACT LIMITATIONS: 
UNCOMPLETED WORKS: 
Rock Island District: 
Levees under sec. 6, Flood Control Act 
of 1928 
St. Louis District: 
Levees under sec. 6, Flood Control Act 
of 1928 
Subtotal 
Memphis District: 
Miss. River levees: 
Miss. River levees 
New Madrid 
Channel improvement: 
Revetments 
Dredging 
Dikes 
Reelfoot Lake 
St. Francis Basin: 
Wappapello Reservoir 
St. Francis River and tributaries 
Big Slough and Mayo ditch 
Little River drainage 
Lower White River: 
Augusta to Clarendon, Ark. 
White River backwater levee, Ark. 
Levees under sec. 6, Flood Control Act 
of 1928 
West Tennessee tributaries 
Subtotal 
Vicksburg District: 
Mississippi River levees (excludes Grants 
Canal, $7,070, shown under completed 
works) 
Lower Arkansas River: 
North bank 
South bank 
Tensas Basin: 
Boeuf and Tensas Rivers, etc. 
Red River backwater levee, La. 
Channel improvement: 
Revetments 
Dredging 
Dikes 
Levees under sec. 6, Flood Control Act 
of 1928 
Yazoo Basin: 
Sardis Reservoir 
Enid Reservoir 
Arkabutla Reservoir 
Grenada Reservoir 
Greenwood 
Belzoni 
Yazoo City 
Will M. Whittington auxiliary channel 
$ 579,462 
1,897,980 
2,477,442 
92,211,631 
98,000 
237,268,375 
46,504,028 
39,132,335 
439,434 
8,076,488 
57,071,902 
965,429 
10,181,370 
1,378,172 
10,624,501 
108,651 
7,293,765 
511,354,081 
79,165,610 
7,049,414 
15,643,601 
25,299,994 
13,113,302 
183,002,830 
22,655,245 
22,149,500 
$ 579,462 
1,897,980 
2,477,442 
92,247,154 
98,000 
237,559,507 
46,504,400 
39,343,300 
439,434 
8,096,100 
57,449,471 
965,429 
10,578,000 
1,378,172 
10,624,501 
108,651 
7,638,000 
513,030,120 
79,355,590 
7,049,414 
15,644,586 
25,558,500 
13,372,660 
183,253,265 
22,655,245 
22,381,356 
958,175 
12,159,200 
15,437,900 
12,372,500 
31,674,300 
3,912,800 
316,656 
2,205,611 
10,950,966 
$ - 
35,523 
291,132 
372 
210,965 
19,612 
377,569 
396,630 
-
344,235 
1,676,039 
189,980 
985 
258,506 
259,358 
250,435 
231,856 
958,175 
12,159,200 
15,437,900 
12,372,500 
31,674,300 
3,874,590 
316,656 
2,205,611 
10,950,966 
1259 
38,210

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 42-S (Cont'd) STATEMENT OF ALLOTMENTS AND ACCRUED EXPENDITURES (COSTS) 
UNDER APPROPRIATIONS FOR FLOOD CONTROL, MISSISSIPPI RIVER 
AND TRIBUTARIES FROM MAY 15, 1928 THROUGH FISCAL YEAR 1970 
(NEW STRUCTURE EFFECTIVE 1 JULY 1955) 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures June 30, 1970 
UNCOMPLETED WORKS (Cont'd) 
Vicksburg District (Cont'd) 
Yazoo Basin (Cont'd) 
Main Stem $ 16,349,500 $ 16,348,911 $ 589 
Tributaries 17,157,994 16,008,716 1,149,278 
Big Sunflower River, etc. 12,044,000 12,005,258 38,742 
Yazoo backwater 12,603,500 12,200,513 402,987 
Upper auxiliary channel 7,806 7,806 - 
Subtotal 517,421,524 514,600,598 2,820,926 
New Orleans District: 
Baton Rouge Harbor 699,185 699,185 - 
Bayou Cocodrie and tributaries 3,423,608 3,423,608 - 
Channel Improvement: 
Dredging 35,945,266 35,945,266 - 
Revetments 86,547,917 86,180,522 367,394 
Lower Red River (south bank levees) 9,000,000 8,723,228 276,772 
Levees under sec. 6, Flood Control Act 
of 1928 200,680 200,680 - 
Miss. River levees 53,388,400 53,339,558 48,842 
Atchafalaya Basin: 
Atchafalaya Basin Floodway 176,266,537 172,945,488 3,321,049 
Atchafalaya River navigation 303,463 303,463 - 
Old River 65,071,000 64,808,920 262,080 
Subtotal 430,846,055 426,569,918 4,276,137 
Total uncompleted works 1,463,775,141 1,455,002,039 8,773,102 
ADVANCE ENGINEERING & DESIGN (CONSTRUCTION) 
Memphis District: 
Cache River 420,000 419,975 25 
Big Creek & Tribs., Lower White River 190,000 179,741 10,259 
Clarendon Levee, Lower White River 20,000 14,932 5,068 
West Kentucky Tribs. 175,000 158,099 16,901 
Subtotal 805,000 772,747 32,253 
New Orleans District: 
Miss. Delta Region 90,000 44,486 45,514 
Teche Vermilion 175,000 159,243 15,757 
Subtotal 265,000 203,729 61,271 
TOTAL ADVANCE ENGINEERING 
& DESIGN 1,070,000 976,476 93,524 
RECREATION FACILITIES - COMPLETED PROJECTS 
Eight-year Program Funds 
Vicksburg District: 
Sardis Reservoir 667,000 97,038 569,962 
Enid Reservoir 202,000 53,399 148,601 
Arkabutla Reservoir 107,000 25,974 81,026 
Grenada Reservoir 290,000 54,226 235,774 
Total Eight-year Program funds 1,266,000 230,637 1,035,363 
Total chargeable against Flood 
Control Act Limitations excluding 
flood control emergencies 1,630,838,142 1,620,936,152 9,901,990 
1260

MISSISSIPPI RIVER COMMISSION 
TABLE 42-S (Cont'd) STATEMENT OF ALLOTMENTS AND ACCRUED EXPENDITURES (COSTS) 
UNDER APPROPRIATIONS FOR FLOOD CONTROL, MISSISSIPPI RIVER 
AND TRIBUTARIES FROM MAY 15, 1928 THROUGH FISCAL YEAR 1970 
(NEW STRUCTURE EFFECTIVE 1 JULY 1955) 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures June 30, 1970 
Total maintenance since August 18, 1941 $ 518,087,855 $ 515,723,871 $ 2,363,984 
Total flood control emergencies 14,900,300 14,900,300 - 
Total general investigations 6,715,881 6,502,992 212,889 
Total flood control, MR&T appropriations 2,170,542,178 2,158,063,315 12,478,863 
Appropriations in addition to flood control, MR&T 
Other appropriations itemized in 
Footnote (1) pp. 2068-69 Annual 
Report for 1953 32,068,909 32,068,909 
Grand total appropriated to 
June 30, 19702 2,202,611,087 2,190,132,224 12,478,863 
NOTE: Preauthorization study costs chargeable to the MR&T authorization have been transferred to completed work. Costs not 
chargeable have been excluded from this report. 
1. Government responsible for deferred maintenance costs 
through June 30, 1971. 
2. Does not include $8,516,000 held in Budgetary Reserve 
and allotted in July 1970. 
TABLE 42-T STATEMENT OF EXPENDITURES FOR LEVEES BY STATE AND LOCAL 
ORGANIZATIONS FROM BEGINNING OF EARLIEST AVAILABLE RECORDS 
THROUGH DECEMBER 31, 1969 
Engineer District Reporting Expenditures 
Rock Island District $ 8,609,858 
St. Louis District 37,478,142 
Memphis District 131,318,919 
Vicksburg District 69,561,186 
New Orleans District 270,339,972 
Total 517,308,077 
1261 
451-584 0-72-80

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
TABLE 42-U COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
Mississippi River General Investigations 
and tributaries Allotted $ 460,952 $ 598,000 $ 1,185,000 $ 1,230,000 $ 6,715,881 
(Regular Funds)1 Cost 385,357 525,541 1,011,291 1,385,476 6,502,992 
Construction (includes 
advance engineering 
& design) 
Allotted 59,175,000 54,137,000 47,040,000 43,540,000 1,580,995,7274 
Cost 58,791,117 50,600,850 43,642,866s 44,427,3436 1,571,093,738 
Maint. 
Allotted 27,500,000 27,400,000 27,575,000 27,600,000 568,466,406 
Cost 26,943,370 26,924,234 26,169,958 28,868,210 566,102,421 
Flood control 
emergencies 
(Maint.) 
Allotted - - - - 14,885,922 
Cost - - - - 14,885,922 
(Contributed New Work 
Funds) Contrib. 850 2,500 73,826 2,400 5,014,392 
Cost 118 5,592 79,526 362 5,012,214 
Maint. 
Contrib. 20,520 22,246 23,819 24,060 521,9097 
Cost 20,520 22,246 23,717 23,078 520,825 
1. Approp. were as follows: 
Approp. chargeable against Flood Control Act authorizations: 
Flood control, Mississippi River and tributaries except for emergencies (excludes Maint. allotments Aug. 18, 1941 through June 30, 1970): 
Net total allotted for works under Mississippi River Commission: $1,598,039,370 
Eight-Year Program Funds, Construction General: 1,266,000 
Surveys under sec. 10 of Flood Control Act of 1928 (not under MRC): 4,995,215 
Transferred to revolving fund: 24,944,460 
Impounded savings: 1,593,097 $1,630,838,142 
Flood control emergencies: 
Net total allotted: 14,885,922 
Impounded savings: 14,378 14,900,300 
Additional funds not chargeable against Flood Control Act authorizations: 
Approp. for FC, MR&T except for flood control emergencies: 
General investigations: 6,715,881 
Maint. allotments Aug. 18, 1941 through June 30, 1970: 518,087,855 524,803,736 
Approp. in addition to Approp. for FC, MR&T (itemized in footnote (1), pp. 2068-69, Annual Report for 1953): 32,068,909 
Budgetary Reserve, allotted July 1970: 8,516,000 
Grand Total: 2,211,127,087 
Reconciliation of Approp. and allotments: 
Total allotted to June 30, 1970: 2,171,063,937 
Transferred to revolving fund: 24,944,460 
Surveys under sec. 10 of Flood Control Act of 1928 (not under MRC): 4,995,215 
Impounded savings withdrawn by Chief of Engineers: 1,607,475 
Budgetary Reserve, allotted July 1970: 8,516,000 
Total Approp. to June 30, 1970: 2,211,127,087 
Approp. for past 4 years were as follows: 
FY 67 - 87,135,952; FY 68 - 82,135,000; FY 69 - 75,800,000; and FY 70 - 80,886,000. 
2. Includes $1,200,000 from 5-Year Program Funds, Con- 5. Includes $104,713 from 5-Year Program Funds, Construction 
General 96X3122. struction General 96X3122. 
3. Includes $66,000 from 8-Year Program Funds, Construc- 6. Includes $125,924 from 8-Year Program Funds, Construction 
General 96X3122. tion General 96X3122. 
4. Includes $389,090 from Public Works Acceleration, Execu- 7. Includes $2,867 contributed for flood control emergencies. 
tive (transfer to Corps, Civil) FY 1963. 
1262

COASTAL ENGINEERING RESEARCH CENTER 
Organization and functions. The U. S. Army Coastal 
Engineering Research Center (CERC) was established 
under authority of Public Law, 172, 88th Congress, 
which abolished the former Beach Erosion Board 
(organized under authority of sec.2, 1930 River and 
Harbor Act, as amended (33 USC 426), and directed 
that its functions other than the review of reports of 
investigations made concerning erosion and protection 
of shores of coastal and lake waters, be vested with the 
Coastal Engineering Research Center. The report 
review function was transferred to the Board of 
Engineers for Rivers and Harbors, putting reports on 
beach erosion control and shore protection studies 
under the same review procedures as reports in other 
phases of the water resources study program of the 
Corps. The authorizing act also provided that the 
functions of the Coastal Engineering Research Center 
be conducted with the guidance and advice of a 
Coastal Engineering Research Board, to be constituted 
by the Chief of Engineers in the same manner as the 
former Beach Erosion Board. 
During Fiscal Year 1970 the following served as 
members of the Coastal Engineering Research Board: 
Major General Francis P. Koisch, U. S. Army, 
Director of Civil Works, Office Chief of Engineers, 
President; Major General Charles M. Duke, U. S. 
Army, Division Engineer, North Atlantic Division; 
Major General Thomas J. Hayes, III, U. S. Army, 
Division Engineer, South Atlantic Division; Brigadier 
General William M. Glasgow, Jr., U. S. Army, 
Division Engineer, South Pacific Division; Brigadier 
General William W. Watkin, Jr., Division Engineer, 
North Central Division; Dean Morrough P. O'Brien, 
Dean Emeritus of College of Engineering, University of 
California; Dr. Arthur T. Ippen, Professor of Hydraulics, 
Massachusetts Institute of Technology, and 
Dr. Robert G. Dean, Chairman of the Department of 
Coastal and Oceanographic Engineering, University of 
Florida. Lieutenant Colonel Edward M. Willis was 
Executive Secretary to the Board and Director of the 
Center. 
The Coastal Engineering Research Center is the 
principal research and development facility of the 
Corps in the field of coastal engineering. The mission of 
the Center is to: (a.) Conceive, plan and conduct 
research and development in the field of coastal 
engineering, in order to provide a better understanding 
of coastal processes. winds, waves, tides, currents, and 
materials as they apply to navigation, recreation, flood 
and storm protection, shore and beach erosion control, 
shore structures, and offshore islands and structures; 
(b.) Conceive, plan and conduct research on the effects 
of the coastal activities of the Corps of Engineers on the 
ecology of the coastal zone; (c.) Collect and publish 
information and data concerning coastal phenomena 
and reasearch projects which are useful to the Corps of 
Engineers and to the public; (d.) Assist in the planning 
and design of coastal works, including determination of 
probable effects of such works on adjacent shores, 
establishment of hurricane protection criteria; and 
evaluation of the stability, durability and effectiveness 
of proposed coastal navigation improvements and 
other coastal works; (e.) Assist in the review, for 
technical adequacy, of studies, plans, and specifications 
for beach erosion control and other coastal engineering 
works; (f.) Provide specialized consulting services to 
other elements of the Corps of Engineers and, as 
directed, to other Federal agencies; and (g.) Provide 
specialized training in coastal engineering to other 
public agencies. 
Operations and results during fiscal year. The staff of 
Coastal Engineering Research Center reviewed 29 
reports for technical adequacy; of which 8 concerned 
navigation projects, 19 concerned beach erosion 
control projects, one concerned combined beach 
erosion control-navigation project, and one concerned 
a combined beach erosion control-hurricane project. In 
keeping with the responsibility for publishing information 
and data concerning coastal phenomena, 11 
technical reports by staff members were published by 
CERC or in other technical journals during the year 
and 7 others are currently in press. Four abstracts were 
published in technical journals. Three Technical 
Memorandums were issued by Coastal Engineering 
Research Center and 2 are in preparation to go to 
press. Four technical manuscripts were published in 
the "Miscellaneous Papers" series. Eighteen additional 
reports are in preparation. The staff worked on 10 
major research or engineering projects for various 
agencies and prepared 5 reports thereon. A number of 
lesser studies were made and reported on. A training 
course in coastal engineering was given to a group of 
trainees from the Board of Engineers for Rivers and 
Harbors, and lectures were given by staff members to 
universities and to technical and non-technical groups. 
Members of the staff part participated in a number of 
committees of various technical societies. Research to 
supplement staff activities was carried out at 19 
universities under 27 contracts, and with 10 institutions 
and commercial concerns; funds were also provided to 
the Waterways Experiment Station to assist in the 
construction of the generalized tidal inlet model basins 
and to continue work on mathematical modelling of 
harbor surging and on the study of underwater soil 
1263

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
mechanics. At the end of the year work and studies by 
the staff were in progress on: the characteristics of 
ocean waves as determined by actual measurement at a 
number of field locations; the characteristics of coastal 
inlets; the analysis of wave spectra; the sources of sand 
for use as beach fill; the durability of various pile 
coatings in the surf zone; the relation of littoral drift to 
incident waves; the techniques for measuring littoral 
drift rates; embankment stability under wave action; 
the effectiveness of vegetation for dune stabilization; 
coastal problems peculiar to the Alaskan environment; 
the geomorphology of Atlantic coastal zone; the 
ecological effects of offshore dredging; the correlation 
of wave climate and beach deformation; the revision 
and updating of Technical Report No. 4, Shore 
Protection and Planning; the use of the middle ground 
shoal area as a deposition trap in sand bypassing; and 
the evaluation of completed coastal works. 
Research work at the Coastal Engineering Research 
Center, or being done at other institutions for the 
Center, was financed primarily by Coastal Engineering 
Research and Development Funds, General Expense 
Funds and Engineering Studies Funds. For FY 1970 
appropriated and allotted funds in these three categories 
amounted to $3,100,000, $245,000, and $75,000 
respectively. Reimbursable work done for others 
provided another $89,000 for in house use. 
1264

CALIFORNIA DEBRIS COMMISSION* 
This Commission, consisting of three Corps officers 
appointed by the President with the consent of the 
Senate, created by act of March 1, 1893 (27 Stat. L., p. 
507), was organized in San Francisco, Calif., on June 8, 
1893, and has jurisdiction and duties extending over 
drainage area of Sacramento and San Joaquin Rivers, 
comprising great central valley of California and 
extending from crest of Sierra Nevada on the east to 
that of Coast Range on the west, and from Mount 
Shasta and Pitt River Basin on the north to Tehachapi 
Mountains on the south. These rivers empty into head 
of Suisun Bay ultimately discharging into Pacific 
Ocean through connecting bays and straits and the 
Golden Gate. Duties of the Commission comprise 
regulation of hydraulic mining in drainage area of 
Sacramento and San Joaquin Rivers, Calif., so that 
debris will not be carried into navigable waters or 
otherwise cause damage; jurisdiction over construction 
and control of water storage facilities for domestic, 
irrigation, and power development purposes; and 
direction of improvements for control of floods on 
Sacramento River. 
IMPROVEMENTS 
Navigation Page 
1. Regulation of hydraulic mining and 
preparation of plans ...................... 1265 
2. Sacramento River and tributaries, 
California (debris control) ................ 1266 
3. 
4. 
Navigation (cont.) Page 
Treatment of Yuba River debris 
situation-restraining barriers, 
California ........................................ 1266 
Flood Control 
Sacramento River, Calif. ......................... 1267 
NAVIGATION 
1. REGULATION OF HYDRAULIC 
MINING AND PREPARATION OF 
PLANS 
Location. Operations largely limited to territory 
between Mount Lassen on the north and Yosemite 
Valley on the south, on western watershed of Sierra 
Nevada. (See Geological Survey sheets for the area, 25 
in number.) 
Existing project. Provides for regulating hydraulic 
mining operations, planning improvement of conditions 
upon Sacramento and San Joaquin Rivers and 
their tributaries affected by such operations, and 
preparation of plans to enable hydraulic mining to be 
resumed in their drainage areas. In addition, the 
Secretary of Army is authorized to enter into contracts 
to supply storage for water and use of outlet facilities 
from debris-storage reservoirs for domestic and irrigation 
purposes and power development, upon such 
conditions of delivery, use, and payment as he may 
approve. Applications of prospective miners are fully 
investigated by California Debris Commission and 
permits to operate are issued to those who provide 
satisfactory debris-restraining basins by construction of 
suitable dams where necessary or agree to make 
payment for storage in Government-constructed, 
debris-restraining reservoirs constructed under act of 
June 19, 1934, as set forth below. For location and 
description of Government-constructed, debris-restraining 
reservoirs for general hydraulic mining see 
Improvement 2. (See table 44-B for authorizing 
legislation.) 
Local cooperation. Mineowners must bear all expenses 
incurred in complying with orders of the Commission 
for regulation of mining and restraint of debris. 
Operations and results during fiscal year. Inspected 
Hydraulic mines to determine compliances of mineowners 
with requirements of license issued. Administrative 
work overlaps that of improvements 2, 3, 
and 4, hereunder, and that of Sacramento District. 
Condition at end of fiscal year. The Commission received 
1,292 applications for hydraulic mining licenses; 3 
mines are licensed, none of which use storage behind 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
1265 
__

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Government debris dams. Work remaining is, in 
general, continuation of above or similar operations. 
2. SACRAMENTO RIVER AND 
TRIBUTARIES, CALIFORNIA (DEBRIS 
CONTROL) 
Location. Project reservoirs are to be constructed in 
watersheds of Yuba, Bear, and American Rivers, Calif. 
(See Geological Survey sheets for basin areas, seven in 
number.) 
Existing project. Designed to permit resumption of 
hydraulic mining on a substantial scale and provides 
for construction of reservoirs for purpose of retaining 
mining debris. North Fork Reservoir is on North Fork 
of American River about 5 miles northeast of city of 
Auburn and 40 miles northeast of Sacramento. Dam is 
155 feet high, 620 feet long, and reservoir has debris" 
storage capacity of 26 million cubic yards. Harry L. 
Englebright Reservoir is on Yuba River about 20 miles 
northeast of city of Marysville. Dam is 280 feet high, 1, 
142 feet long, and reservoir has a debris storage 
capacity of 118 million cubic yards. Completed 
reservoirs are also utilized for recreation purposes; 
initial facilities were provided in fiscal year 1959. 
Recreation areas at Harry L. Englebright Reservoir 
are maintained by the Corps. Recreation areas at 
North Fork Reservoir are maintained and operated by 
Auburn Recreation Park and Parkway District. Total 
Federal cost of new work for construction of these 
reservoirs was $4,646,872, including $40,000 for 
recreation facilities. Cost of recreation areas at North 
Fork Dam was $57,500. It is estimated (July 1970) that 
improvements to recreation areas will cost $1,173,000 
for Harry L. Englebright Dam. Reservoir project sites 
on Middle Fork of American River and on Bear River 
are considered inactive and excluded from foregoing 
cost estimate. Estimated cost of this portion is $1,820, 
000 (1935). Existing project was adopted by River and 
Harbor Act of 1935 (Rivers and Harbors Committee 
Doc. 50, 74th Cong., 1st sess.). For latest published 
map, see project document. Act of November 6, 1945, 
provided that dam constructed at Upper Narrows site 
on Yuba Rivdr, Calif., should thereafter be Harry L. 
Englebright Dam. 
Local cooperation. Satisfactory assurances were furnished 
the Secretary of the Army for repayment of 
capital cost of reservoir from taxes on material 
hydraulically mined, under licenses, and impounded in 
these reservoirs. These funds are paid to Director of 
Internal Revenue then credited by Treasurer of the 
United States to Hydraulic Mining in California 
Debris fund. Improvements made to facilities at North 
Fork Dam and Reservoir by Auburn Recreation Park 
and Parkway District under a lease agreement with the 
Secretary of the Army and Auburn Boat Clubs 
(concessionaire) at an estimated cost of $46,000 since 
September 1953. 
Licenses. Under provisions of Contract No. W-1105- 
eng-2998 with Pacific Gas and Electric Co., payment is 
to be made to the Federal Government of $18,000 per 
year for the first 30 years (December 29, 1942-1972) 
and $48,000 per year between December 29, 1972, and 
December 29, 1992, in return for use of head at 
Englebright Dam and generation of hydroelectric 
power. Total payment through June 30, 1970, amounts 
to $486,100; these funds are paid to California Debris 
Commission and deposited for credit by Director of 
Internal Revenue to "Debris Fund." 
Operations and results during fiscal year. New work: 
Englebright Reservoir, Code 710 funds-Engineering 
continued. Maintenance: Maintenance and operation 
activities continued at North Fork Dam at a cost of $30, 
112, including recreation facilities ($7,726); and at 
Harry L. Englebright Dam at a cost of $57,868, 
including recreation facilities ($23,392), and excluding 
an addition to operators quarters at Harry L. Englebright 
Dam accomplished by contract, $14,444. 
Condition at end of fiscalyear. Construction of dams was 
initiated in 1937; North Fork Dam and Reservoir was 
completed and in use at end of fiscal year 1939; and 
Harry L. Englebright Dam and Reservoir was completed 
in January 1941. The two debris-control 
structures are in good condition. Public use of these 
reservoir recreation areas greatly overtaxes present 
capacities. 
3. TREATMENT OF YUBA RIVER 
DEBRIS SITUATION-RESTRAINING 
BARRIERS, CALIFORNIA 
Location. Works are on Yuba River between Marysville 
and where the river emerges from the foothills, 
near Hammonton, some 10 miles easterly from 
Marysville, or about 9 miles below the Narrows. (See 
Geological Survey Topographic map of Sacramento 
Valley, Calif.) 
Existing project. Provides for storage of mining debris 
within riverbed of Yuba River, a nonnavigable stream, 
to keep such debris from passing into Feather and 
Sacramento Rivers to detriment of navigation therein. 
Improvement consists of a debris barrier, a 40-foot wide 
reinforced concrete stepped slab with upstream and 
downstream cutoff walls; training walls 85,100 feet 
long which provide a 600-foot wide channel above and 
a 500-foot wide channel b elow dam; dikes across 
overflow channels; and protective works downstream 
to maintain Yuba River in its confined channel to its 
junction with Feather River at Marysville. Total cost of 
new work was $723,259, of which $361,482 was U.S. 
funds and $361,777 required contributed funds by 
State of California. (For details of project in its original 
form, see Annual Report, 1917, p. 1810.) In February 
1963, center section of dam failed and major rehabilitation 
of structure was completed in December 
1964. Total cost for required rehabilitation was $1,660, 
000, of which $830,000 was Federal cost and $830,000 
required contribution by State of California toward 
rehabilitation cost. During the December 24, 1964, 
1266

CALIFORNIA DEBRIS COMMISSION 
floodflows on the Yuba River, the rehabilitated 
Daguerre Point Dam sustained considerable damage. 
(See 1965 Annual Report, p. 1647 "Operations and 
results during fiscal year.") The reconstructed portion 
of the dam completed earlier in December 1964 was 
undamaged by the flood. Permanent repair of Daguerre 
Point Dam abutment and fish facilities was 
completed in October 1965 at a cost of $447,808 with 
Federal and required State contributed funds on a 
matching basis. Existing project was adopted in a 
rather indefinite form by River and Harbor Act of 1896 
and in its more definite form by River and Harbor Act 
of 1902 (H. Doc. 431, 56th Cong., 1st sess.). (For latest 
published map, see Geological Survey topographic 
map of Sacramento Valley, Calif.) 
Local cooperation. Fully complied with for new work 
and major rehabilitation work. Total first cost to local 
interests for new work was $361,777, all of which was 
required contribution by State of California. In 
addition, training walls were built on each bank below 
Daguerre Point for 11,250 feet and just above Daguerre 
Point, on the south bank, for 11,000 linear feet by two 
gold-dredging companies in connection with their 
dredging operations. It was estimated (1902) that it 
would have cost the United States $450,000 to build 
these training walls. Flood channels were also built by 
gold-dredging companies within the confines of the 
project works. It was estimated (1926) that cost of 
equally effective works to restrain debris movement 
would have been more than $776,000 to the United 
States. Total costs to local interests for initial and 
permanent major rehabilitation works were $830,000 
and $223,904, respectively, all of which was required 
contribution by State of California. State of California 
must contribute annually an amount equal to the 
Federal allotment for maintenance. 
Operations and results during fiscal year. Maintenance: 
Operations included condition and operation studies, 
and preparation of plans and specifications, by hired 
labor. Bank restoration and stone protection was 
accomplished along right and left banks Yuba River, 
various locations upstream from Marysville, at a 
contract cost of $33,127. In addition, repair of 
Daguerre Dam was accomplished at a contract cost of 
$14,840. 
Condition at end of fiscal year. Construction of project 
works was initiated in November 1902. Construction of 
Daguerre Point Dam was completed in May 1906; 
diversion of river over dam was completed in 1910; 
training walls and dikes were completed in 1935. 
About 140 million cubic yards of debris are held in 
lower 7 miles of Yuba River between Marysville and 
downstream end of training walls. About 20 million 
cubic yards are confined in river channel by Daguerre 
Point Dam. Additional millions of yards of loose 
material are in mine tailing fields adjacent to project 
training walls in upper 7-mile reach of project. Initial 
rehabilitation of Daguerre Point Dam begun in July 
1963 was completed in December 1964. Contract for 
permanent rehabilitation of structure was initiated in 
July and completed in October 1965. 
FLOOD CONTROL 
4. SACRAMENTO RIVER, CALIF. 
Location. Works covered by this improvement are on 
Sacramento River and tributaries in north-central 
California from Collinsville to Ord Bend, a distance of 
184 miles. 
Previous project. For details see page 1815 of Annual 
Report for 1917, page 1995 of Annual Report for 1938, 
and page 2262 of Annual Report for 1907. 
Existing project. Sacramento River flood control 
project is a comprehensive plan of flood control for 
Sacramento River and lower reaches of its principal 
tributaries. Improvement extends along Sacramento 
River from Ord Bend in Glenn County, Calif., 184 
miles downstream to its mouth at Collinsville at upper 
end of Suisun Bay, and comprises a system of levees, 
overflow weirs, drainage pumping plants, and flood 
bypass channels or floodways designed to carry surplus 
floodwaters without inundation of valley lands. About 
980 miles of levee construction with an average height 
of 15 feet, and 98 miles of bank protection are involved 
in project. For further details, see Annual Report for 
1962, page 2115. (See table 44-B for authorizing 
legislation.) 
Approved estimated (July 1970) cost for existing 
project (exclusive of above supplemental levee improvements), 
including new work and maintenance, is 
$163,640,000 of which $68,640,000 is Federal cost and 
$95 million non-Federal ($90,050,562 for lands and 
damages and relocations and $4,949,438 required 
contributed funds for levee construction, bank protection 
works, and levee setbacks). Of this amount $4, 
939,752 was for new work and $9,686 for maintenance. 
In addition to project requirements, local interests 
constructed several pumping plants for drainage of 
agricultural and urban land protected by project 
levees. Also, some channel clearing work was accomplished 
by State of California and other local 
interests to supplement project levee construction. 
Dredging below Cache Slough and reconstruction of 
Cache Creek settling basin weir are considered 
deferred and excluded from foregoing cost estimate. 
Estimated cost (July 1962) of these project units is $2, 
560,000 and $520,000, respectively, a total of $3,080, 
000, plus U.S. costs, for construction. Operation and 
maintenance of completed project will be responsibility 
of local interests; as units of project are completed, they 
are transferred to agencies of State of California for 
operation and maintenance. Existing project was 
adopted by 1917 Flood Control Act (H. Doc. 81, 62d 
Cong., 1st sess., as modified by Rivers and Harbors 
Committee Doc. 5, 63d Cong., 1st sess.), 1928 Flood 
Control Act (S. Doc. 23, 69th Cong., 1st sess.), River 
and Harbor Act of 1937 (S. Committee print 75th 
1267

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Cong., 1st sess.), and 1941 Flood Control Act (H. Doc. 
205, 77th Cong., 1st sess.). 
Local cooperation. Local interests have fully complied 
with requirements for all work completed or under 
contract, and indicated they will be able to fulfill 
requirements for remaining work as scheduled. Local 
interests costs from required contributed funds for 
project work total $4,949,438 for levee construction, 
bank-protection works, and levee setbacks, of which $4, 
939,752 was for new work and $9,686 for maintenance. 
Operations and results during fiscal year. Regular funds: 
Engineering continued and miscellaneous minor work 
in connection with levee construction was accomplished 
by hired labor. Project prevented an 
estimated $100,000 in damages from the January 1970 
flood. 
Condition at end of fiscal year. Construction of existing 
project began in fiscal year 1918 and is about 99 
percent complete. Channel improvement to date has 
produced a channel with a capacity of 579,000 cubic 
feet per second in Sacramento River below Cache 
Slough. In addition, discharges up to 21,000 cubic feet 
per second can be diverted from Sacramento River 
through Georgiana Slough. Completed major project 
items include about 977 miles of levees; five weirs with 
a combined discharge capacity of 602,000 cubic feet 
per second; two cutoff channels; two sets of outfall 
gates; channel improvement and clearing in Sacramento 
River, Butte Creek, Putah Creek, and Sutter 
and Tisdale Bypasses; construction of two main 
bypasses or floodways and secondary bypasses at 
Tisdale and Sacramento weirs and at Wadsworth 
Canal; construction of Knights Landing ridge cut and 
of Cache Creek settling basin; installation of gaging 
stations; and enlargement of Sacramento River below 
Cache Slough. Cutoffs at Collins Eddy and between 
Wild Irishman and Kinneys Bends were made in 1918 
and 1919, respectively. Sacramento weir was completed 
in 1917, Fremont weir in 1924, Tisdale and 
Moulton weirs in 1932, and Colusa weir in 1933. 
Outfall gates at Knights Landing were constructed in 
1930 and at mouth of Butte Slough in 1936. Pumping 
plants on Sutter Bypass were completed in 1944. Work 
items with reference to clearing, snagging, rectification 
of channels, and bank protection on Sacramento River 
and tributaries in Tehama County and from Red Bluff 
southerly, provided for by 1941 Flood Control Act were 
accomplished in fiscal years 1947, 1948, 1949, and 
1951. Work remaining comprises completion of levee 
stage construction, Yolo Bypass and Cache Slough. 
(See table 44-C for total cost of existing project to June 
30, 1970.) (See also table 44-D for contributed funds, 
other.) 
1268

CALIFORNIA DEBRIS COMMISSION 
COST AND FINANCIAL STATEMENT 
See 
Section Cost to 
in Text Project Funding FY67 FY68 FY69 FY70 June 30, 1970 
1. Regulation of Maint.: 
Hydraulic Mining 
and Preparation 
of Plans 
2. Sacramento River 
and Tributaries, 
Calif. (Debris 
Control) 
3. Treatment of Yuba 
River Debris Situation 
Restraining 
Barriers, Calif. 
(Federal Funds) 
(Required Contributed 
Funds) 
(Contributed 
Funds, Other) 7 
4. Sacramento River, 
Calif. (Federal 
Funds) 
(Contributed 
Funds) 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
Maint.: 
Contrib. 
Cost 
Rehab.: 
Contrib. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
Maint.: 
Contrib. 
Cost 
$4,432 
4,432 
130,000 
37,964 
68,000 
72,472 
$2,974 
2,974 
68,000 
178,585 
114,439 
129,508 
$2,154 
2,154 
12,000 
16,628 
68,271 
68,297 
$ 4,840 
4,840 
$ 818,714 
818,714 
5,009,3751,2 
74 5,009,3751,3 
104,263 
102,424 
1,213,9784 
1,211,1785 
361,482 
361,482 
50,000 
42,512 
-1,096 
42,512 
-26,096 
45,000 
45,521 
36,804 
44,331 
60,000 
44,306 
12,000 
29,774 
28,873 
28,876 
50,000 
28,897 
294 
2,921 
44,498 
33,955 
33,955 
12,000 
6,937 
1,450,6936 
1,440,1506 
1,053,904 
1,053,904 
361,777 
361,777 
1,450,223 
1,439,856 
1,053,904 
1,053,904 
34,000 
34,000 
67,243,235 
67,237,7978 
1,979,104 
1,979,104 
10,684,2189 
10,684,218 
9,68610 
9,68610 
1. Exclusive of $644,503 appropriation and costs on inactive 
portion of project. 
2. Includes $362,498 for recreational facilities at North 
Fork and Harry L. Englebright Reservoirs, Code 710 appropriations. 
3. Includes $362,499 for recreational facilities at North 
Fork and Harry L. Englebright Reservoirs, Code 710 appropriations. 
4. Includes $764,340 from regular funds and $449,638 from 
Hydraulic Mining in California funds. 
5. Includes $761,540 from regular funds and $449,638 from 
Hydraulic Mining in California funds. 
6. Includes deferred maintenance funds in amount of 
$207,500. 
7. Miscellaneous engineering and construction accomplished 
at expense of local interests in connection with rehabilitation of 
Daguerre Point Dam necessitated by December 1964 floodflows. 
8. Includes appropriation and cost of $680,000 for new 
work for previous project and $1,486,469 public works funds 
for new work for existing project. 
9. Includes $680,000 required contribution for previous 
project; $4,939,752 required contributed funds for existing 
project; and $310,801 voluntary contribution for bank protection 
for existing project. 
10. Includes $9,686 required contributed funds for existing 
project. 
1269 
TABLE 44-A

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
AUTHORIZING LEGISLATION 
Work Authorized 
REGULATION OF HYDRAULIC MINING AND PREPARATION 
OF PLANS (See Section 1 of Text) 
Mar. 1, 1893 
Feb. 27, 1907 
June 19, 1934 
June 25, 1938 
Dec. 22, 1944 
and May 17, 
1950 
July 3, 1958 
July 14, 1960 
Created California Debris Commission and authorized: 
(a) Hydraulic mining under its regulation 
in drainage areas of Sacramento and San Joaquin 
Rivers, if possible without injury to navigability 
of these river systems or to lands adjacent thereto; 
and (b) preparation of plans by Commission for improvement 
of navigability of these river systems, 
and flood and debris-control therein. 
Authorized California Debris Commission to permit 
hydraulic mining without construction of impounding 
works, provided there is no injury to navigability 
of above river systems or lands 
adjacent thereto. 
Amended Act of Mar. 1, 1893, which provides for construction 
of debris dams or other restraining works 
by California Debris Commission and collection of a 
3-percent tax on gross proceeds of each mine using 
such facilities, so as to eliminate this tax and 
substitute an annual tax per cubic yard mined, obtained 
by dividing total capital cost of each dam, 
reservoir, and rights-of-way, by total capacity of 
reservoir for restraint of debris; and authorized 
revocation of Commission orders permitting such 
mining, for failure to pay this annual tax within 
30 days after its due date; and also authorized 
receipt of money advances, from mineowners to aid 
such construction, to be refunded later from annual 
payments of yardage taxes on material mined. 
Added at end of Sec. 23 of above Act, a provision that 
Secretary of the Army is authorized to enter into 
contracts to supply storage for water and use of 
outlet facilities from debris-storage reservoirs 
for domestic and irrigation purposes and power 
development, upon such conditions of delivery, use, 
and payment as he may approve, these payments are 
to be deposited to credit of such reservoir project, 
reducing its capital cost to be repaid by tax on 
mining operations. 
SACRAMENTO RIVER, CALIF. (See Section 4 of Text) 
Additional levee construction and reconstruction, 
including levee protection of Upper Butte Basin, 
and multipurpose reservoirs.2 
Bank protection and incidental channel improvements, 
Sacramento River from Chico Landing to 
Red Bluff, and local interests flood plain zoning 
above Chico Landing.2 
Bank protection works at critical locations, 
Sacramento River.2 
1. For latest published map, see Annual Report for 1913, p. 
3170, and Rivers and Harbors Committee Document 50, 74th 
Cong., 1st sess. 
2. This supplemental work is reported in detail under 
Sacramento District, Improvement No. 28. 
1270 
TABLE 44-B 
Acts Documents 
Ex. Doc. 267, 51st Cong., 
2d sess., Ex. Doc. 98, 
47th Cong., 1st sess. 1 
(Amendment of sec. 13, Act 
of Mar. 1, 1893.)1 
H. Docs, 649, 78th Cong., 
2d sess., and 367, 81st 
Cong., 1st sess. 
H. Doc. 272, 84th Cong., 
2d sess. 
S. Doc. 103, 86th Cong., 
2d sess.

CALIFORNIA DEBRIS COMMISSION 
TABLE 44-C SACRAMENTO RIVER, CALIF.: TOTAL COST OF 
EXISTING PROJECT TO JUNE 30, 1970 
(See Section 4 of Text) 
Funds New Work Maintenance Total 
Regular $65,071,328 $1,979,104 $67,050,432 
Public Works 1,486,469 - 1,486,469 
Total U.S. $66,557,797 $1,979,104 $68,536,901 
Contributed Project Work 4,939,752 9,686 4,949,438 
Contributed, Other 5,064,466 5,064,466 
Total All Funds $76,562,015 $1,988,790 $78,550,805 
1. Excludes $429,671 representing book value of plant purchased with previous project funds and transferred to existing project without 
reimbursement. 
TABLE 44-D SACRAMENTO RIVER, CALIF.: RIVERS AND HARBORS, 
CONTRIBUTED FUNDS, OTHER (FY 1970) 
(See Section 4 of Text) 
Appropriations Expenditures Unexp. Unoblig. 
Project Bal. Bal. 
New Work Maintenance Total New Work Maintenance Total 6/30/70 6/30/70 
Sacramento River 
FCP $ - $ $ - $-- $ - $ - 
Sacramento R. & 
M&M Tribs. - - - - 3,427 3,427 
Totals, FY 1970 - - - - - - 3,427 3,427 
Totals to June 30, 
1970: 
Sacramento River 
FCP2 10,684,218 9,686 10,693,904 10,684,218 9,686 10,693,904 
Sacramento R. & 
M&M Tribs.1 1,607,238 - 1,607,238 1,603,811 - 1,603,811 
Sacramento R., 
Chico Landing 
to Red Bluff 25,582 - 25,582 25,582 - 25,582 
Emergency FC 
Work - 48,014 48,014 - 48,014 48,014 
American River 54,019 - 54,019 54,019 - 54,019 
Totals to June 30, 
1970 $12,371,057 $57,700 $12,428,757 $12,367,630: $57,700 $12,425,330 
1. Excludes funds contributed by State Highway Department under Project No. 811, contributed funds, other. 
2. Includes $680,000 for previous project. 
1271

U.S. ARMY ENGINEER WATERWAYS EXPERIMENT STATION 
Organization and Functions. The Chief of Engineers, by 
letter dated June 18, 1929, to the President of the 
Mississippi River Commission, directed establishment 
of an hydraulic laboratory in the alluvial valley of the 
Mississippi. This institution is the Waterways Experiment 
Station, with installations at Vicksburg and 
Jackson, Miss. It was initially established in 1929, 
under jurisdiction of the President, Mississippi River 
Commission. By General Order 9, Office, Chief of 
Engineers, July 29, 1949, the station was transferred to 
the direct jurisdiction of the Chief of Engineers, 
effective August 10, 1949. Colonel Ernest D. Peixotto, 
Corps of Engineers, is director. 
The organization is the principal field agency of the 
Corps for the conduct of scientific and engineering 
research, development, and investigational activities in 
technical fields of hydraulics, ground mobility, flexible 
pavements, soils other than those phases involving 
seasonal frost and permafrost, nuclear and conventional 
weapons effects on structures, terrain and 
waterways, and concrete other than those phases 
directly relating to design and construction of rigid 
pavements. On a reimbursable basis, Waterways 
Experiment Station performs experimental studies and 
applied research, and provides consulting services 
pertaining to problems encountered throughout the 
Corps as are within its broad capabilities in its assigned 
fields. Such services include model and prototype 
studies, engineering and analytical design studies 
including blast and shock effects, laboratory research 
concerning portland cement and bituminous concrete 
mixture proportioning, laboratory testing, and field 
investigations. Field investigation services include 
planning, accomplishment, and analysis of: comprehensive 
exploration of soil and rock formations; 
comprehensive examination and inspection of portland-
cement concrete structures in service, including 
use of nondestructive testing procedures; instrumentation 
systems to measure water velocities and 
directions and to determine pressures, deflections, and 
strains in engineering structures; telemetry systems, 
principally for hydrologic data; and field inspection 
services, including establishment of control laboratories 
and training field personnel. Subject to approval by the 
Chief of Engineers, studies can also be undertaken for 
other agencies. 
The Waterways Experiment Station also operates 
for the Corps a central agency for analysis and 
dissemination of technical information, particularly in, 
but not necessarily limited to, fields covered by 
Hydraulics, Soils, and Concrete Divisions. In connection 
with this fact-disseminating service, the station 
maintains an extensive scientific and engineering 
reference library and issues publications of general 
interest, which can aid materially in eliminating 
dduplication of effort throughout the Corps in the 
conduct of experimental studies. During Fiscal Year 
1970, 160 reports of individual studies conducted at the 
Waterways Experiment Station, 7 translations, 20 
contract reports, and 28 miscellaneous publications for 
the Waterways Experiment Station and other offices 
were distributed to Corps offices and interested outside 
agencies. In addition, editing and printing units 
completed about 2,650 miscellaneous assignments for 
the Waterways Experiment Station and other offices. 
Operations and Results During Fiscal Year. Work 
accomplished at the Waterways Experiment Station is, 
in general, initially financed by a revolving fund, 
reimbursement being obtained directly from agencies 
for whom work is performed. Cost for operation of 
station for fiscal year 1970 was $22,789,362, of which 
$19,789,299 was charged to establishments served for 
research investigations and related services, and $3, 
000,063 for permanent improvements and equipment. 
Of the reimbursable work, $6,255,277 was charged to 
civil funds, $13,413,092 to military funds, and $120,930 
to nongovernmental agencies. Work includes $2,039, 
247 performed by contract. Total cost incurred for 
operation of the Waterways Experiment Station to 
June 30, 1970 was $265,093,711, of which $248,243,499 
represents reimbursable cost and $16,850,212 the 
unamortized cost of permanent improvements and 
equipment. 
1273

PERMANENT INTERNATIONAL ASSOCIATION 
OF NAVIGATION CONGRESSES 
The United States by act of June 28, 1902, 
appropriated $3,000 a year for support and maintenance 
of the Permanent International Commission of 
Navigation Congresses and for payment of the actual 
expenses of properly accredited national delegates of 
the United States to meetings of the Congresses and 
Commission. An increase in the appropriation of $5, 
000 annually was authorized by 1948 River and 
Harbor Act. The 1965 River and Harbor Act authorized 
an appropriation of $22,000. Of this amount, 
$2,375 is paid by the American Section directly to the 
International Association with headquarters in Brussels, 
Belgium. 
The objective of the Association-to promote the 
progress of inland and maritime navigation-is met by 
holding International Congresses and publishing 
technical bulletins and other documents. The Congresses 
are held in various member countries, usually at 
4-year intervals. The Association is supported principally 
by member governments, but membership also 
extends to corporations and individuals. Member 
governments are represented at the Congresses and at 
meetings of the Permanent International Commission 
by delegates, the number of official delegates to be 
determined by the amount of the annual subsidy paid 
by the government, but not to exceed 10 in number. 
Corporate members may send one official representative 
to the Congresses. Individual membership 
is of two classes-Annual and Life, depending on the 
method of payment of dues. 
The affairs of the Association are managed by the 
Permanent International Commission composed of 
delegates from the supporting governments. The 
National Commission constitutes the governing body of 
the American Section and the U. S. members of the 
Permanent International Commission. 
The Director of Civil Works, Office of the Chief of 
Engineers, U. S. Army; and Resident Member, Board 
of Engineers for Rivers and Harbors, are the ex-officio 
Chairman and Secretary, respectively, of the National 
Commission. The Secretary handles all administrative 
matters of the American Section. 
During fiscal year 1970, the National Commissioners 
were: Maj. Gen. F. P. Koisch, USA' ex-officio 
Chairman; Co. A. D. Wilder, CE, USA, ex-oficio 
Secretary; Mr. Jerome O. Ackerman; Col. Carl H. 
Bronn, USA (Ret.); Mr. Braxton B. Carr; Mr. Mark S. 
Gurnee; Mr. J. W. Hershey; Mr. Joseph H. McCann; 
Mr. Duane Orr; and Mr. Theodore M. Schad.d. Brig. 
Gen. Herbert D. Vogel, USA (Ret.), and Mr. Carl B.. 
Jansen are honorary members of the Commission. 
The annual meeting of the Permanent International 
Commission was held in Lisbon, Portugal, on May 19, 
1970, and was attended by the 10 National Commissioners 
and Maj. Gen. Charles G. Holle USA 
(Ret.), the Honorary Member of the Permanent 
International Commission from the United States. 
Membership of the American Section on June 30, 
1970, totaled 712, consisting of 641 individuals and 63 
corporate members. A total of 40 new individual 
members and 8 new corporate members were added 
during the fiscal year, and 1 life and 64 individual 
members deleted either through resignation, death, or 
non-payment of dues. 
Federal funds from annual appropriations were 
expended as follows: Annual U. S. Contribution to 
Association, $2,375; expenses of representatives to 
annual meeting in Lisbon, $6,049; publications, $25; 
total obligations, $8,449. 
1275

INVESTIGATIONS AND SUPERVISION OF PROJECTS 
UNDER FEDERAL WATER POWER ACT 
The Federal Water Power Act of June 10, 1920, 
created the Federal Power Commission, composed of 
the Secretaries of War, Interior, and Agriculture, with 
authority to grant permits and licenses for hydroelectric 
developments in all waters over which 
Congress has jurisdiction. The act further required that 
work of the Commission be performed by and through 
the Departments of War, Interior, and Agriculture, 
and their engineering, technical, and other personnel, 
except as may be otherwise provided by law. By an act 
of June 23, 1930, entitled "An Act to reorganize the 
Federal Power Commission," sections 1 and 2 of the 
Federal Water Power Act of 1920 were amended. A 
commission was provided for, to be composed of five 
commissioners to be appointed by the President, by 
and with the advice and consent of the Senate. The 
necessity of performing work through the Departments 
of War, Interior, and Agriculture was removed and the 
Commission authorized to appoint such officers and 
employees as necessary in executing its functions. By 
title II, Public Utility Act of 1935, the original Federal 
Water Power Act was made part I of the Federal Power 
Act, and parts II and III added to that act. The law 
also provides that no waterpower license affecting 
navigable capacity of any navigable waters of the 
United States shall be issued until plans of the dam or 
other structures affecting navigation have been approved 
by the Chief of Engineers and the Secretary of 
the Army. There is further provision whereby any 
person or corporation intending to construct hydroelectric 
project works in any stream over which 
Congress has jurisdiction, other than navigable waters, 
shall file a declaration of intention for the purpose of 
ascertaining whether or not jurisdiction of the Federal 
Power Commission will attach. 
The following work of an engineering nature was 
assigned and accomplished during the fiscal year: 23 
plans approved by Chief of Engineers and Secretary of 
the Army in accordance with sec. 4 (e) of the Federal 
Water Power Act; 33 reports submitted on applications 
for preliminary permits or licenses or amendments 
thereto and reports on licensed projects subject to 
recapture; and 8 licenses under supervision. 
Necessary expenses in excess of nominal amounts for 
transportation and subsistance of personnel engaged in 
investigations and cost of supervision under provisions 
of the Federal Power Act are paid from appropriations 
made for the Power Commission. All other costs of 
administration of laws in question are paid from funds 
available for general expense of the Corps of Engineers. 
No expenses were paid from appropriations made for 
the Federal Power Commission during the fiscal year. 
1277 451-584 0-72-81

MISCELLANEOUS CIVIL WORKS 
IMPROVEMENTS 
TABLE OF CONTENTS Page 
1. Miscellaneous Activities ........................... 1279 
2. International Boundary Waters Boards1280 
2A. International St. Croix River Board of 
C ontrol ................................................. 1280 
2B. International Saint John River 
Engineering Board ............... ......... 1281 
2C. International Lake Memphremagog 
Board ............. ...............1.2.81...... 
2D. International Lake Champlain Board 
of Control ........................................ 1281 
2E. International St. Lawrence River Board 
of C ontrol ........................... ................. 1282 
2F. International Niagara Board of Control 1283 
2G. International Niagara Committee .......... 1284 
2H. American Falls International Board ..... 1285 
21. International Great Lakes Levels Board 1286 
2J. Coordinating Committee on Great 
Lakes Basic Hydraulic and 
Hydrologic Data ................................ 1287 
2K. International Great Lakes Study Group 1288 
2L. International Lake Superior Board of 
C ontrol .................................................. 1289 
Page 
2M. International Prairie Portage Board of 
Control ....................... .............. 1289 
2N International Rainy Lake Board of 
C ontrol ...................... ...................... 1290 
20. International Lake of the Woods 
Control Board .......................... 1290 
2P. International Pembina River 
Engineering Board ...................... 1291 
2Q. International Souris-Red Rivers 
Engineering Board ...................... 1291 
2R. International Kootenay Lake Board of 
Control ..................................... 1292 
2S. International Osoyoos Lake Board of 
Control ........................................ 1292 
2T. International Skagit River Board of 
Control ........................................ 1292 
2U. Columbia River Treaty Entities ......... 1293 
2V. Columbia River Treaty Permanent 
Engineering Board ............................. 1293 
1. MISCELLANEOUS ACTIVITIES. 
In addition to the work of improving rivers and 
harbors, civil works of a miscellaneous character as 
indicated below have been committed to the Corps of 
Engineers. 
Work accomplished. The work of the fiscal year is 
summarized as follows: 3 danger zone regulations 
established or modified under provisions of ch. XIX of 
the Army Act of July 9, 1918, or sec. 7 of the River and 
Harbor Act of August 8, 1917; 1 dumping grounds 
regulation established or modified under provisions of 
sec. 4, River and Harbor Act of March 3,1899; I1f ishing 
regulation established or modified under sec. 10, River 
and Harbor Act of March 3, 1899; 4 harbor lines 
established or modified under provisions of Sec. 11, 
River and Harbor Act of March 3,1899; 12 navigation 
regulations established or modified under provisions of 
sec. 7, River and Harbor Act of August 8, 1917; 7,965 
permits issued for work or structures in navigable 
waters under provisions of sec. 10, River and Harbor 
Act of March 3, 1899, and 221 revised plans were 
approved; and 71 sunken vessels removed under 
provisions of secs. 19 and 20, River and Harbor Act of 
March, 1899, and 161 sunken vessels were investigated 
and either removed by owner or removal was not 
considered necessary. 
* All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also 
appear at the end of this chapter. 
1279

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Funds: For funds with which the miscellaneous civil 
works were prosecuted during the fiscal year see Table 
48-A. 
2. INTERNATIONAL BOUNDARY 
WATERS BOARDS. 
In order to carry out United States obligations under 
international agreements, the Office of the Chief of 
Engineers and several Divisions and Districts of the 
Corps with jurisdiction over areas bordering Canada, 
have representation on numerous Boards and Committees. 
The majority of these Boards are established 
by the International Joint Commission (IJC) as 
empowered in accordance with the provisions of the 
Boundary Waters Treaty of 1909 between the United 
States and Great Britain (Canada). IJC Boards fall 
into two broad categories; boards of control, which are 
more or less permanent; and engineering or technical 
boards, which are usually dissolved after completing 
their assignment. In addition to Boards created by the 
Commission other boards and committees are created 
by treaties or other informal arrangement in matters 
concerned with the water resources, and the members 
report directly to the Government or establishing 
agency. A listing of the Boards having Corps of 
Engineers membership follows: 
2A. THE INTERNATIONAL ST. CROIX 
RIVER BOARD OF CONTROL 
Constitution and duties. The Board was organized 
pursuant to conditions in the orders of the International 
Joint Commission approving the maintenance 
and operation of the dam built by the St. Croix 
Water Power Co. and the Sprague Falls Manufacturing 
Co., Ltd., across the St. Croix River at 
Grand Falls, Maine, and subsequent agreements 
reached between the Governments of the United States 
and the Dominion of Canada. The Board is charged 
with the duty of formulating and administering rules 
under which the power plant and accessories are to be 
operated to prevent as nearly as possible a level of 
water at the dam higher than 203.5 (mean sea level 
datum), and to secure the users of water below Grand 
Falls the flow of water to which they are entitled. The 
Board is also charged with the supervision of the 
operation of all fishways on that portion of the St. Croix 
River that forms the international boundary. On 
October 2, 1934, the International Joint Commission 
issued an order approving the reconstruction of the 
dam by the Canadian Cottons, Ltd., extending across 
the St. Croix River from Milltown, New Brunswick, 
Canada, to Milltown, Maine, which contained the 
following conditions: (a) the reconstructed dam to be 
operated to insure that the forebay levels rise to no 
higher elevation than that which was obtained in the 
operation of the dam now being replaced; (b) during 
floods the sluiceways of the dam shall be sufficiently 
open to insure passage of the river flow; and (c) the 
operation of the dam, insofar as is necessary to insure 
the observance of the provisions of this Order, be under 
the supervision of the International St. Croix River 
Board of Control. On November 19, 1965, the Commission 
directed the Board of Control, in addition to 
the duties previously assigned, to carry out the duties 
contained in the Order of Approval dated October 15, 
1965, for the construction of the storage dam at 
Vanceboro and requested that future reports be 
submitted semi-annually. 
Members of the Board for fiscal year. Colonel Frank P. 
Bane, Division Engineer, U. S. Army Engineer 
Division, New England, Waltham, Massachusetts, 
United States Member, and Mr. John E. Peters, 
District Engineer, Inland Waters Branch, Department 
of Energy, Mines and Resources, Ottawa, Ontario, 
Canadian Member. 
Operations during fiscal year. Supervision was maintained 
and inspections were made by the Canadian 
and the United States members to ensure that the 
Orders of Approval of the International Joint Commission 
were carried out. 
The New Brunswick Electric Power Commission 
completed the erection of Unit Number 7, a 500 KW 
generator in its Milltown Generating Station in 
December 1969. 
The Georgia-Pacific Corporation reports that the 
construction of its 31,000 KVA, O.9pf thermal electric 
generating unit at Woodland, Maine, is expected to be 
completed during the fall of 1970. 
During the period October - December 1969, the 
Georgia-Pacific Corporation reconstructed their timber 
storage dam at the outlet of East Grand Lake. 
Water Survey of Canada reports that the telemark 
equipment has been installed in the Baring International 
Gauging Station in cooperation with the 
United States Geological Survey. 
The Board of Control has been advised that first 
order levelling will be extended to the Grand Falls 
Dam by the Precise Levelling Section, Department of 
Energy, Mines and Resources, Canada, in 1971, or 
earlier, if survey programs can be adjusted. 
On July 23, 1969, the United States and the 
Canadian members met with officials of the New 
Brunswick Electric Power Commission and the Georgia-
Pacific Corporation. They toured the facilities of 
the Corporation including the pollution control structures 
under construction at Woodland as well as the 
Milltown Generating Station of the New Brunswick 
Electric Power Commission. 
In the spring of 1970 high precipitation occurred over 
the East Branch St. Croix River. This, coupled with 
melting snow, caused Spednick and East Grand Lakes 
to fill in April and May. East Grand Lake on May 18, 
1970, slightly exceeded the maximum established by 
the Commission, namely Elev. 434.94, but was immediately 
lowered by the owner. 
1280

MISCELLANEOUS CIVIL WORKS 
Proposed operations. Such correspondence and inspection as 
may be necessary to carry out the Orders of Approval of the 
InternationaJl oint Commission will be continued. 
2B. INTERNATIONAL SAINT JOHN RIVER 
ENGINEERING BOARD 
Construction and duties. The Board was established 
September 28, 1950 by the International Joint Commission 
to determine if the waters of the Saint John 
River system could be more beneficially conserved and 
regulated. The Board's report was submitted to the 
Commission in April 1953. It outlined several projects, 
the development of which would be practical and in 
the public interest. The Commission submitted its 
interim report to the two governments in April 1954. 
Since then the services of the Board have been retained 
to advise the Commission, keeping the latter informed 
at least annually on any resource developments being 
undertaken or proposed by entities in either country. 
Members of the Board for fiscal year. The Board consists 
of four members, two from each country. The Canadian 
representatives were Mr. J. D. McLeod, Senior 
Engineer, Inland Waters Branch, Department of 
Energy, Mines and Resources, Ottawa, Ontario, 
Chairman of the Canadian Section and Mr. J. E. 
Bright, Regional Director, Atlantic Region, Department 
of Public Works, Halifax, Nova Scotia. 
The United States representatives were Mr. E. L. 
Hendricks, Chief Hydrologist, Water Resources Division, 
U. S. Geological Survey, Washington, D. C., 
Chairman of the United States Section and Mr. F. L. 
Thrall, Engineer, Planning Division, U. S. Army, 
Office, Chief of Engineers, Washington, D. C. 
Operations during fiscal year. The Board did not meet 
during the year, but it reviewed developments within 
the basin and reported to the International Joint 
Commission on activities of new Brunswick Power 
Commission, unchanged status of the Dickey-Lincoln 
School project, status on sewage treatment facilities in 
the basin, setting of water quality and' uses classification 
on the river by the State of Maine, status of 
small boat hydrographic charting, that the Canada- 
New Brunswick Saint John River Basin Agreement for 
resource development was signed June 30, 1970 and a 
major flood occurred in February 1970. 
2C. INTERNATIONAL LAKE 
MEMPHREMAGOG BOARD 
Constitution and duties. Lake Memphremagog is in 
northern Vermont and southeastern Quebec and has as 
its outlet Magog River in Canada. In 1920, a petition 
filed by the city of Newport and towns of Derby, 
Coventry, and Barton, Vt., alleged they had been 
harmed by high lake levels attributable to construction 
and operation of power plants on the Magog River. As 
a result, the international board composed of one 
engineer each from the United States and Canada was 
appointed to consider the matter and submit a joint 
report to each Government as to the level or levels at 
which Lake Memphremagog should, so far as possible, 
be maintained. At the request of local interests, 
consideration of the problem was suspended until 1931 
when a survey was made. Subsequently a joint report 
by the two members of the Board, dated May 14,1934, 
was submitted to their respective Governments. This 
report recommended that the levels of the lake under 
normal flow conditions range between an upper 
elevation of 682.70 feet above mean sea level (Geodetic 
Survey of Canada, 1923 adjustment), and a lower limit 
of 678.98 feet above the same datum. During flood 
conditions, the sluiceways of the dam shall be so 
operated as to reduce the flood water elevations to the 
normal regulated level of 682.70 as rapidly as possible. 
The Board was reactivated by both Governments 
August 12, 1960 as a result of a complaint on July 20, 
1959, by a resident of Newport, Vt., concerning high 
lake levels due to alleged improper operation of the 
power plant. 
Members of the Board for fiscal year. Mr. J. D. McLeod, 
Senior Staff Officer, Assistant Deputy Minister 
(Water), Department of Energy Mines and Resources, 
for Canada and Col. Harvey L. Jones, District 
Engineer, U. S. Army Engineer, District, New York for 
the United States for the period July 1 - 16, 1969 and 
Col. James W. Barnett for the remainder of the fiscal 
year. 
Operations during fiscal year. Supervision of the levels 
was maintained. A Stevens Telemark signal answering 
instrument was installed at the Magog Wharf gaging 
station by the Water Survey of Canada to furnish 
instantaneous water level elevations referred to the Old 
Datum of the Geodetic Survey of Canada which is 0.13 
feet less than 1923 adjustment. The Water Resources 
Branch of the U. S. Geological Survey records daily 
readings of the elevation of Lake Memphremagog at 
Newport Vt. Datum of the gage is 673.00 feet above 
mean sea level, U. S. Geological Survey 1929 adjustment 
which is 0.30 feet higher than the Geodetic 
Survey of Canada, 1923 adjustment. 
2D. INTERNATIONAL LAKE CHAMPLAIN 
BOARD OF CONTROL 
Constitution and duties. The Board was organized 
pursuant to the provisions of the Order of Approval, 
dated June 10, 1937, of the International Joint 
Commission, approving construction and operation of 
certain remedial works in Richelieu River at Fryer's 
Island, Quebec. The Board is responsible for insuring 
compliance with provisions of the order of approval 
insofar as they relate to the regulation of the levels of 
Lake Champlain. 
Members of the Board for fiscalyear. Mr. N. P. Persoage, 
Inland Waters Branch, Department of Energy, Mines 
and Resources, for Canada, and Col. Harvey L. Jones, 
District Engineer, U. S. Army Engineer District, New 
York, for the United States for the period July 1 - 16, 
1281

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
1969 and Col. James W. Barnett for the remainder of 
the fiscal year. 
Operations during fiscal year. The wall of the lock at St. 
Johns, which had collapsed, was rebuilt in June 1970. 
Studies have been continued by the Canadian Department 
of Transport to determine the best method of 
maintaining navigation between the Chambly Basin 
and St. Johns, Quebec, in view of the rapidly 
deteriorating condition of the Chambly Canal. Further 
experiments may be carried out with low head at the 
Fryer's Island dam whereby some water will be 
impounded to improve conditions at Ile Ste. Therese. 
The effect of any such operation will not extend 
upstream of the rapids located between Ile Ste. Therese 
and St. Johns. 
2E. INTERNATIONAL ST. LAWRENCE 
RIVER BOARD OF CONTROL 
Constitution and duties. The Board was established 
December 16, 1953 pursuant to the provisions of the 
Order of Approval dated October 29, 1952, of the 
International Joint Commission for the construction of 
certain works for the development of power in the 
International Rapids Section of the St. Lawrence 
River. The Commission instructed the Board to 
perform the duties assigned to it by the Order of 
Approval. These responsibilities include the following 
items: (a) The Board of Control is to determine the 
gages, measurements and other services to be provided 
by the Power Authority of the State of New York and 
the Hydro-Electric Power Commission on Ontario in 
order to furnish accurate records relating to water 
levels and the discharge of water through the works and 
the regulation of the flow of water through the 
International Rapids Section; (b) Upon completion of 
the works the duties of the Board shall be to insure that 
the provisions of the Commission's Orders relating to 
water levels and the regulation of the discharge of 
water from Lake Ontario and the flow of water through 
the International Rapids Section are complied with, 
and the Hydro-Electric Power Commission of Ontario 
and the Power Authority of the State of New York shall 
duly observe any direction given them by the Board of 
Control for the purpose of insuring such compliance. 
The Board of Control shall report to the Commission at 
such times as the Commission may determine; (c) In 
addition to the reports to be made by the Commission 
in accordance with the terms of the Orders of 
Approval, the Board was requested to report at the 
Commission's semi-annual meetings and also to keep 
the Commission currently informed with regard to the 
discharge of water from Lake Ontario and the flow 
through the International Rapids Section of the St. 
Lawrence River; and (d) At a meeting of the 
International Joint Commission in Toronto on January 
25, 1957, studies of the regulation of Lake Ontario 
in furtherance of such studies accomplished by the 
Intei national Lake Ontario Board of Engineers, were 
assigned to the Board of Control. 
The Canadian members were: Mr. D. M. Ripley, 
Director, Marine Hydraulics Branch, Department of 
Transport, Chairman of the Canadian Section; Mr. J. 
B. Bryce, Hydraulic Engineer, Hydro-Electroic Power 
Commission of Ontario; Mr. Y. DeGuise, Commissioner, 
Hydro-Electric Power Commission of Quebec; 
and Mr. R. H. Clark, Special Adviser to the 
Director, Inland Waters Branch, Department of 
-Energy, Mines and Resources. The United States 
members were: the Division Engineer, U. S. Army 
Engineer Division, North Central, Chairman, exofficio, 
U. S. Section; Mr. Thomas M. Crum, Deputy 
to the Chief, Division of Licensed Projects, Federal 
Power Commission; Mr. J. B. McMorran, Commissioner, 
Department of Transportation, State of New 
York; and Mr. F. F. Snyder, Hydraulic Engineer. U. S. 
Army, Office, Chief of Engineers, (Retired). Brigadier 
General W. W. Watkin, Jr. was North Central Division 
Engineer during the fiscal year, Mr. R. D. Conner, 
Power Authority of the State of New York replaced by 
Mr. McMorran effective on June 5,1970. 
Operations during fiscal year. During the fiscal year the 
Board met twice and presented two semi-annual 
reports to the IJC. At its appearance before the 
Commission on October 1, 1969, the Board presented a 
statement concerning the low water levels experienced 
on Lake St. Lawrence during the summer of 1969. In 
reply to the complaints from and on behalf of riparian 
owners about low lake levels and requests for action to 
increase the water level of Lake St. Lawrence, the 
Commission, on October 9, 1969 issued a press release 
explaining the situation on Lake St. Lawrence. The 
Commission instructed the Board to investigate and 
report on the possibilities and consequences of providing 
for a measure of emergency relief, on a 
temporary basis, for those affected and to advise the 
Commission. The Board investigated two methods, 
ponding and discretionary deviations, which might 
provide relief whenever regulation would result in 
Lake St. Lawrence levels below a selected elevation. 
The conclusion subsequent to this investigation was 
that deviations from Plan 1958-D by the Board's 
discretionary authority may, in some years, be a 
feasible method of improving the low water levels of 
Lake St. Lawrence during the recreational seasons. 
The Board will continue to keep this matter under 
review and be prepared to exercise its discretionary 
authority, upon recommendations of its Regulation 
Representatives and Operations Advisory Group, as to 
when such deviations are feasible and when payback 
should occur. 
The Board of Control approved two reports of its 
Committee on River Gaging, which provides and 
maintains a comprehensive program for recording 
river levels and flows and advises the Board. The Power 
Entities have installed the necessary gages requested to 
date and the required records are being obtained. 
The levels and overflows of the St. Lawrence project 
have continued to be regulated in accordance with the 
1282

MISCELLANEOUS CIVIL WORKS 
International Joint Commission's Orders of Approval 
dated October 1952 and July 2, 1956, known as 
"Regulation Plan 1958-D." 
The supplies to the Great Lakes have remained 
generally favorable during the reporting period. There 
were no violations of the approved range of state on 
Lake Ontario during the reporting period. 
Peaking tests were continued throughout the period 
and ponding was authorized during the non-navigation 
season. There has been no system emergency 
requiring additional flow during the winter season. 
The Board was advised of a metering program 
planned jointly by the St. Lawrence Seaway Development 
Corporation and the St. Lawrence Seaway 
Authority. This program was carried out during the 
spring of 1970 by the Water Survey of Canada and the 
U. S. Lake Survey, Corps of Engineers. The program 
involved flow measurements on the St. Lawrence River 
at Massena Point and in the North Channel below 
Pollys Gut. The Board had requested its Regulation 
Representatives to assist in effecting the necessary 
coordination with the Power Entities so that the 
required periods of flow stabilization could be programmed 
to produce minimum effect on power 
production. 
No problems related to ice formation were encountered 
during the winter. 
The Board has noted the possibility in the event that 
the navigation season is extended on the St. Lawrence 
that certain works would need to be provided to assure 
that such extension could be accomplished without 
adversely affecting the interests concerned. The Board 
had requested its Operations Advisory Group to take 
this matter under consideration and submit a brief 
thereon. 
2F. INTERNATIONAL NIAGARA BOARD 
OF CONTROL 
Constitution and duties. The Board was established 
August 19, 1953 by the International Joint Commission 
to supervise the construction, maintenance and operation 
of the Niagara Remedial Works, recommended 
by the Commission in its 1953 report on the 
"Preservation and Enhancement of Niagara Falls." 
Members of the Board for fiscal year. The United States 
Members of the Board were the Division Engineer, U. 
S. Army Engineer Division, North Central, ex-officio 
Chairman, U. S. Section; and Mr. T. M. Crum, 
Deputy to the Chief, Division of Licensed Projects, 
Federal Power Commission. Brigadier General W. W. 
Watkin, Jr. was North Central Division Engineer, 
during the fiscal year. The Canadian Members of the 
Board were Mr. R. H. Clark, Special Adviser to the 
Director, Inland Waters Branch, Department of 
Energy, Mines and Resources, Chairman of the 
Canadian Section and Mr. G. Millar, Chief Engineer, 
Harbors and Rivers Engineering Branch, Department 
of Public Works. 
Operations during fiscal year. The Board met three times 
during the fiscal year and presented two semi- annual 
reports to the IJC. In 1968 the Power Entities had 
recommended to the Commission that a later date be 
considered for removal of the Niagara River - Lake 
Erie ice boom. The Board investigated this and 
reported its findings to the Commission. The Commission 
held a public hearing in 1969 to receive 
testimony and evidence from interested parties as to the 
desirability of providing more flexibility regarding the 
dates when the ice boom is to be installed and removed. 
Based upon the findings of the Board's investigation 
and the hearing, by Supplementary Order dated 
October 3, 1969 the Commission further amended its 
Order of Approval of June 9, 1964 in the matter of the 
Niagara River - Lake Erie ice boom providing flexible 
dates for closing the boom in the fall and opening it in 
the spring in accordance with weather and ice 
conditions. The ice boom was fully reinstalled on 
Decednber 10, 1969 and removed by April 30,1970. The 
experience gained during the 1969-70 operations of the 
boom has shown in particular that the delaying 
opening of the boom beyond the first Monday in April, 
as formerly specified, was beneficial this year to both 
shore property and power interests on the Niagara 
River with no material detrimental effects to navigation 
on Lake Erie. Over the past six winters the ice 
boom has functioned successfully. 
During the past fiscal year the gates in the control 
structure have been operated to maintain the pool 
within the limits set by the Board. On days when there 
are ice runs or storms the normal operating limits for 
the Chippawa-Grass Island Pool may be suspended 
temporarily and, under such circumstances, the Power 
Entities diverting water from the pool are expected to 
use their best judgment in operating the gates. 
The Board, assisted by regular reports from its 
Working Committee, has closely observed the operation 
of the control structure to assure that operation 
of the structure was in accordance with the Board's 
instructions. The Board has encountered no unusual 
maintenance problems during the year. 
Although the study of means of preserving or 
enhancing the scenic beauty of the American Falls is 
primarily a function of the American Falls International 
Board, some aspects of that study are 
pertinent to the International Niagara Board of 
Control because of their possible effects on levels of the 
Maid-of-the-Mist pool, Grass Island pool, etc. 
Additional temporary diversions from the Niagara 
River for power production purposes were allowed 
during the period that a temporary cofferdam was in 
place. 
As requested by the Commission in its letter dated 
June 13, 1969, the Board submitted to the Commission 
by letter dated January 12, 1970 its determination of 
total contribution, in cash or in services, which the 
Power Authority of the State of New York and the 
Hydro-Electric Power Commission of Ontario will 
1283

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
make toward the cost of the American Falls study due 
to the diversions. The computed contribution from 
each entity was $276,500 in the currency of its country. 
By letters dated February 24, 1970 the Commission 
informed the Board that the recommended amount 
was approved. 
Eighteen discharge measurements were made at the 
Austin Street Section of the Niagara River during the 
first part of the Fiscal Year to delineate the full range of 
weed effect on the Fort Erie gage. Twelve additional 
discharge measurements were carried out at the Stella 
Niagara Section during pre-arranged steady flow 
conditions through the power plants in October, 
November and December 1969. These measurements 
were made to provide an indirect determination, under 
steady flow conditions, of the discharge past the 
Ashland Avenue Gage. 
A study to investigate a proposal to establish an 
aerial metering cableway in the lower Niagara River 
immediately upstream of the Robert Moses Power 
Plant is underway. If this proposal is feasible then flow 
past the Ashland Avenue Gage can be measured 
directly instead of indirectly as is done presently by 
subtracting the outflows of the powerhouses from the 
discharge at the Stella Niagara Section. Also, the 
Board intends to carry out tests to study possible 
backwater effects of power operations on Lake Erie. 
These tests that started in December 1969 were 
cancelled because of unfavorable weather conditions 
and they will be rescheduled during the fall of 1970. 
The Board of Control is concerned about the 
accumulative effect of existing and proposed fills along 
shoreline of the Niagara River. The Board is studying 
the effects of such fills on levels of the Niagara River, 
and will report the results when completed. 
The Commission in August 1969 asked the Board to 
investigate a request by a Rowing Club located at 
Buffalo, New York to install an ice boom in the Black 
Rock Channel for the purpose of reducing the amount 
of ice which passes into the channel after the Lake Erie 
ice boom is opened. The Board has completed its 
investigation and will furnish its report on this matter 
in July 1970. 
2G. INTERNATIONAL NIAGARA 
COMMITTEE 
Constitution and duties. The Treaty of 1950 between 
Canada and the United States concerning the uses of 
waters of the Niagara River was signed on February 27, 
1950. By its provisions, limitations on the diversions of 
Niagara River water for power in accordance with 
Article V of the Treaty of 1909 are terminated and 
temporary international agreements for the allocation 
of waters of the Niagara River for power purposes are 
replaced. In accordance with provisions of Article VII 
of the 1950 Treaty, a representative was appointed by 
each government who, acting jointly, shall ascertain 
and determine the amounts of water available for the 
purposes of this treaty, and shall record the same and 
shall also record the amounts of water used for power 
diversions. By an exchange of -notes during January 
1955, the two Governments officially designated the 
representatives appointed in conformance with Article 
VII of the 1950 Treaty as the International Niagara 
Committee. With regard to flows and diversions, the 
Treaty of 1950 became effective October 10, 1950. 
Under terms of the Treaty, all waters in excess of 
certain minimum flows which are required to maintain 
the scenic spectacle at Niagara Falls are available for 
diversion for power and, with the exception of the 5,000 
cubic feet per second authorized October 1940 for 
diversion by Canada, are to be allocated equally 
between both countries. Minimum flows over the Falls 
shall not be less than 100,000 cubic feet per second 
between 8 a.m. and 10 p.m. E.S.T. from April 1 to 
September 15, and 8 a.m. to 8 p.m. from September 16 
to October 31. At all other times the flow over the Falls 
shall not be less than 50,000 cubic feet per second. A 
brief history regarding the measurement and supervision 
of diversion of waters from the Niagara River 
prior to the designation of the representatives appointed 
under Article VII of the 1950 Treaty as the 
International Niagara Committee is included in the 
Annual Report for 1955. 
Members of the Committee forfiscalyear. The Committee 
consists of two members. Mr. R. H. Clark, Special 
Advisor to the Director, Inland Waters Branch, 
Department of Energy, Mines and Resources, and the 
U. S. representative, ex-officio, was the Division 
Engineer, U. S. Army Engineer Division, North 
Central, Brigadier General W. W. Watkin, Jr., North 
Central, was Division Engineer during the fiscal year. 
Operations during fiscal year. The Committee received 
daily reports of operation of the hydro-electric generating 
stations on the Niagara River which diverted 
water from the river above the Falls, and the DeCew 
Falls Plant, which diverts water from Lake Erie 
through the Welland Canal. These reports, submitted 
in the form prescribed by the Committee and showing 
for each hour the quantities of water diverted by each 
plant, were checked by the Committee. Monthly and 
annual summaries were prepared. The Committee 
included with each monthly summary an explanation 
of any treaty violation which may have occurred 
during the month. The Committee has computerized 
its monthly report in the interest of accuracy and 
efficiency. 
Bi-weekly and intermittent inspections of all plants 
were made by representatives of the Committee jointly 
and individually to obtain independent watt meter 
readings of power output. Records of water levels in the 
Niagara River above and below the Falls were 
obtained by means of self-registering gages. However, 
the American Falls channel water level gage used for 
the purpose of determining flows over the American 
Falls has been providing inconsistent data since the 
dewatering of the Falls in 1969. Thes inconsistencies 
which have been attributed to modifications made to 
the gage intake at the time the American Falls channel 
1284

MISCELLANEOUS CIVIL WORKS 
was dewatered, require a precise recalibration of the 
installation. For the purpose of this recalibration, a set 
of discharge measurements are planned to be made 
during the fall of 1970 or the spring of 1971. 
In a separate exchange of notes on March 21, 1969, 
the Governments of the United States and Canada 
authorized the construction of a temporary cofferdam 
between the Goat Island and the United States 
mainland to permit investigation of measures that may 
be desirable to preserve or enhance the beauty of the 
American Falls and provided an agreement for 
additional temporary diversions from the Niagara 
River for the power production purposes. The investigation 
under the terms of the note was to be 
completed and the cofferdam removed no later than 
December 1969. The notes for additional diversion 
permitted for power purposes state that minimum flows 
over the Falls stipulated in Article IV of the Niagara 
River Treaty of 1950 shall be reduced from 100,000 and 
50,000 cfs, respectively, to 92,000 cfs and 41,000 cfs, 
during the hours designated in that Article. Any water 
in excess of these new temporary minimums may be 
diverted for power purposes; provided that when the 41, 
000 cfs minimum applies at least 9,000 cfs of the waters 
thus diverted shall be either passed through the low 
head plants or released to the Horeshoe Falls so as to 
maintain a minimum flow of 50,000 cfs into the Maidof-
the-Mist Pool at all times. Power benefits derived 
from this temporary arrangement under the terms of 
the note were divided equally between the Power 
Authority of the State of New York and Hydro-Electric 
Power Commission of Ontario, who in return have 
provided sizeable contributions to the cost of the 
cofferdam and ensuing study. The deviation from the 
Treaty flow started on June 12, 1969 when the 
cofferdam was completed until November 29, 1969 
when the cofferdam was removed. It had originally 
been scheduled to keep the Falls dewatered until the 
end of December 1969, however, the field work was 
completed early and the Niagara River was allowed to 
resume its normal course on November 29,1969. 
2H. AMERICAN FALLS INTERNATIONAL 
BOARD 
Constitution and duties. In a Reference dated March 31, 
1967, the Governments of the United States and 
Canada, pursuant to Article IX of the Boundary 
Waters Treaty of 1909, requested the International 
Joint Commission to investigate and report upon 
measures necessary to preserve and enhance the beauty 
of the American Falls at Niagara. The American Falls 
International Board was established July 24, 1967, by 
the International Joint Commission to carry out the 
investigations required under the Reference. 
Members of the Board for fiscal year. The U. S. members 
of the Board were the Division Engineer, ex-officio, U. 
S. Army Engineer Division, North Central, Chairman 
of the U. S. Section; and Mr. Garrett Eckbo, 
Chairman, Department of Landscape and Architecture, 
University of California, Berkeley, Brigadier 
General W. W. Watkin, Jr. was North Central, 
Division Engineer, during the fiscal year. Canadian 
members were Mr. T. M. Patterson, Special Advisor to 
Assistant Deputy Minister (Water), Department of 
Energy, Mines and Resources, Chairman of the 
Canadian Section, and Mr. H. S. M. Carver, Chief 
Advisory Group, Central Mortgage and Housing 
Corporation, Ottawa, (Retired). 
Operations during fiscal year. In an exchange of notes, 
dated March 21, 1969 between Canada and the United 
States which temporarily amended the Niagara Treaty 
of 1950, a minimum flow over the Falls of 92,000 cfs 
instead of 100,000 cfs during the tourists hours and 41, 
000 cfs instead of 50,000 cfs during the non- tourist 
hours was allowed. 
The Power Entities were authorized to utilize the 
extra water and they begin additional diversions on 
June 11 as a cofferdam was being completed allowing 
for dewatering of the Falls. All additional diversions 
ceasing before 3:00 PM on November 28 as the 
cofferdam was being removed. 
The Governments of Canada and the United States 
approved the procedures for contributions to be made 
by the Power Entities for the use of the extra water. 
Under these procedures certain advances and periodic 
payments were to be made by the Power Entities to the 
Buffalo District Engineer on condition that the monies 
be supplied directly to the American Falls studies in the 
form of salaries, travel expenses, materials, equipment 
or other work, and having prior approval of the 
American Falls International Board. The Board 
approved of specific work items from Ontario-Hydro 
with a contribution value of $121,365 and from the 
Power Authority of the State of New York with a 
contribution value of $4,000. 
Following restoration of flow to the American Falls, 
the International Niagara Board of Control determined 
the total contribution from each Power 
Entity and advised the Commission. The Power 
Entities agreed to the amounts determined by the 
Board and the amounts were approved by the 
International Joint Commission. These contributions 
amounted to $276,500 for each Entity in the currency 
of its country. The American Channel was completely 
dewatered for study from June 12 to November 25,1969. 
The following is a summary of major geologic 
exploration activities accomplished during the channel 
dewatered period: 
a. A total of 46 core borings were completed for a 
total footage of 4,882 feet of core. 
b. Pressure testing and hydrologic and tracer testing 
were performed on the completed holes. Piezometers 
were installed in three holes. 
c. The field phase of the face mapping consisting of 
topographic, stratigraphic and structural studies was 
completed. 
1285

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
d. The field survey portion of the terrestrial 
photogrammetry of the face of the American Falls was 
completed. 
e. On-site structure and joint studies of the dewatered 
river bed was completed. 
f. The field talus studies which were completed 
included examination of the cobbles and boulders to 
determine rock type and condition. A seismic survey 
was made to determine the depth of the talus which 
was found to be about 75 feet. 
The data obtained is being compiled and analyzed. 
Some preliminary observations made as to the 
geologic character and condition of the American 
Falls: 
a. The degree of undermining is not as severe as had 
been anticipated. 
b. There appear to be two types of mechanisms of 
failure. In the 1931 rockfall the Rochester shale 
apparently was removed to a significant degree prior to 
failure which occurred principally as a downdropping 
and the talus accumulated close to the area of the 
rockfall. In the July 1954 rockfall apparently less 
undermining occurred prior to failure that appears to 
have been a downward movement of the rock mass 
followed by a considerable amount of outward rotation, 
spreading the talus accumulation from the 
rockfall area to the Maid-of-the-Mist Pool. 
c. There is one large rock mass near Prospect Point 
that has become detached to a greater degree than 
previously realized. In size it is about 38,000 tons, 
approximately half the size of the 1931 rockfall. The 
detached rock appears to have been pulled apart as a 
result of cohesion to a previous rockfall. The stability of 
that area probably is lower than that of other areas. 
Because of the concern expressed on the effect of the 
dewatering on the ecology of the area, a report was 
prepared by Dr. Alfred Beeton entitled "Observations 
on the Ecology of the Niagara River and American 
Falls". The conclusion was that the dewatering did not 
have any detrimental effect on the ecology of the area. 
Members of the Board and its working Committee 
visited the American Falls area several times during 
the dewatered period. 
At a meeting held in Niagara Falls, Ontario on 
March 6, 1970 the Board discussed a proposal to design 
a weir at the outlet of the Maid- of-the-Mist Pool to 
raise the level of the Pool. The Board also discussed the 
development of a hydraulic model of the Falls for use in 
developing alternative treatments of the talus. The 
model was approved and to be so designed as to allow 
easy manipulation of the various talus treatments. 
On April 23, 1970, the Buffalo District Engineer was 
alerted and asked by .the Niagara Frontier State Parks 
Commission of New York State to investigate an 
apparent slope failure at Luna Island. Subsequent to a 
meeting attended by study participants and many 
agencies it was agreed that study of three adjace nt 
areas, Prospect Point, Luna Island and Terrapin Point 
is necessary. As a result of this meeting the Niagara 
Frontier State Parks Commission officials have asked 
that the Board's studies of the American Falls be 
extended to cover in more detail the three areas which 
are suspect of structural weaknesses. 
The Board agreed to inform the International Joint 
Commission of the requested expanded study to 
investigate the stability of adjacent areas of the 
Niagara Gorge wall at and in the vicinity of the 
American Falls and to seek guidance on the boundaries 
of the study under the Reference of March 31,1967. 
21. INTERNATIONAL GREAT LAKES 
LEVELS BOARD 
Constitution and duties. The Governments of Canada 
and the United States, by Reference dated October 7, 
1964, requested the International Joint Commission to 
determine whether measures within the Great Lakes 
Basin can be taken in the public interest to regulate 
further the levels of the Great Lakes or any of them and 
their connecting waters so as to reduce the extremes of 
stages which have been experienced, and for the 
beneficial effects in these waters. The Reference further 
stated that the two Governments will upon request 
make available to the Commission the services of 
engineers and other specifically qualified personnel of 
their governmental agencies And such information and 
technical data as may have been acquired by them 
during the course of the investigation. 
At a meeting on December 2,1964, the International 
Joint Commission established the Board to undertake 
the necessary investigations and studies and to advise 
the Commission on all matters which it must consider 
in making a report or reports to the Government under 
the Reference. At the first meeting of the Board on 
January 6,1965, a Working Committee was selected. 
The Working Committee met on July 7,1965 and set 
up four Subcommittees to investigate and report on the 
separate areas of study involved: Shore Property, 
Navigation, Power and Regulation. A Subcommittee 
on Regulatory Works was subsequently established by 
the Working Committee in September 1967 and a 
Reports Subcommittee in June 1968. 
The Study program is being considered in two broad 
phases: the first phase consists of the collection and 
compilation of basic data, the development of methodology 
for evaluating regulation plans in respect of 
their effects on the various Great Lakes interests, the 
investigation of regulation techniques and the preparation 
of preliminary plans. The work involved in this 
phase has been largely accomplished. In the second 
phase, necessary political and legal restraints to 
regulation will be identified and applied in the 
development of alternative practical regulation plans. 
Concentrated work efforts are being applied to obtain 
the cost data for regulatory works required. 
Members of the Board for fiscal year. United States 
members of the Board were Mr. L. G. Feil, Chief of 
1286

MISCELLANEOUS CIVIL WORKS 
Planning Division, Civil Works, Office, Chief of 
Engineers, U. S. Army, Chairman of the United States 
Section; Mr. M. Abelson, Regional Coordinator, 
Northeast Region, Department of the Interior; and 
Mr. B. T. Jose, Assistant Administrator, St. Lawrence 
Seaway Development Corporation, Department of 
Transportation. Canadian Members of the Board were 
Mr. T. M. Patterson, Special Advisor to Assistant 
Deputy Minister (Water), Department of Energy, 
Mines and Resources, Chairman of the Canadian 
Section; Mr. C. K. Hurst, Chief, Maintenance and 
Operations, Harbors and Rivers Engineering Branch, 
Department of Public Works; and Mr. R. H. Smith, 
Chief, Hydraulics Study Division, Department of 
Transport. The Working Committee consists of seven 
members, four representing the United States and 
three representing Canada. U. S. Members of the 
Working Committee were Brigadier General W. W. 
Watkin, Jr., Division Engineer, North Central, Chairman, 
ex-officio, U. S. Section; Mr. Mark Abelson; Mr. 
A. J. Buchar, Director of Field Service, Chicago Field 
Office, Department of Commerce until April 13, 1970 
when he retired and was replaced by Mr. Michael V. 
Simon, Trade Specialist, Chicago Field Office, Department 
of Commerce; and Mr. J. H. Spellman, 
Deputy Regional Engineer, New York Regional 
Office, Federal Power Commission. Canadian Members 
of the Working Committee were Mr. R. H. Clark, 
Special Adviser to the Director, Inland Waters Branch, 
Department of Energy, Mines and Resources, Chairman 
of the Canadian Section; Mr. D. W. Quinlan, 
Chief Engineer, Planning, Department of Public 
Works; and Mr. John Bathurst, Special Project 
Engineer, Department of Transport until March 5, 
1970 when he was replaced by Mr. C. J. R. Lawrie. Six 
subcommittes have been formed with membership 
drawn from agencies participating in the study and 
represented on the Board and Working Committee. 
Operations during fiscal year. Methodologies have been 
finalized for providing monetary evaluation of the 
effects of Great Lakes level fluctuations on shore 
property, navigation and power interests. Optimization 
techniques are being used to establish the 
maximum net benefit which could be expected from 
regulation of- these lakes. A computer program has 
been developed for this purpose and is being used in the 
testing and preliminary design of improved regulation 
plans. The Regulation Subcommittee has developed 
and the other Subcommittee have evaluated several 
preliminary four-lake, three-lake and two lake regulation 
plans. A preliminary no-cost for regulatory 
works Lakes Superior-Ontario regulation plan has 
been developed by the Regulation Subcommittee and 
provided to the other subcommittees for their detailed 
assessments. 
An investigation for increasing the flexibility of Lake 
Superior is continuing, specifically, to determine the 
ability to pass winter flows in excess of 85,000 cfs. If the 
test prove the feasibility of higher winter flow, 
regulation plans will be developed with higher maximum 
winter outflows. A comparison will be made 
between the cost of operating control gates in winter to 
achieve the higher flows and the economic benefit 
which would ensue therefrom. A second winter of 
experimental operation of the gates of the Lake 
Superior Control Works at Sault Ste. Marie was 
completed during the 1969-1970 winter. Eight additional 
gates were opened providing a total flow of 95, 
000 cfs. Sufficient knowledge and experience was 
gained to verify that the guides could be decided to 
permit gate movement under adverse conditions. 
Under the conditions prevailing during the experiment, 
the tests have demonstrated that a winter 
flow of 95,000 cfs is possible through the gates and St. 
Marys River without ice jamming problems. It is 
planned to continue the tests during future winters to 
verify the feasibility of passing a flow of 95,000 cfs 
under a variety of winter conditions. 
A study of consumptive use of water within the Great 
Lakes basin was completed and filed with the Commission. 
The report contains a projection of this use of 
the year 2030. Upon completion and acceptance of 
final recommended regulation plans by the Board, the 
plans will be retested with a reduced water supply 
(reflecting the projection of consumptive use) and the 
effects on the stages and flows determined. 
Development of preliminary criteria for regulation 
continued. The preliminary criteria will be subject to 
considerable subsequent modification as a result of 
future economic evaluation and further considerations 
in regard to the requirements of the various interests 
concerned with lake regulation. 
A Style and Format Manual has been prepared to be 
used as a guide for the preparation of the Final Report 
of the Board to the Commission. 
The Board has developed a critical path diagram to 
assist in the control of the various interrelated portions 
of the study. This diagram will be updated to reflect 
changes in conduct of the studies and work schedule. 
A detailed briefing on the methodologies and 
progress of the Study was given by study participants to 
the Commission in December 1969. 
The Levels Board studies are being coordinated with 
the Provinces and States which border on the Great 
Lakes and their outflow rivers. Personnel of the 
appropriate Provincial and State Agencies are cooperating 
with those of the participating Federal 
Agencies. 
2J. COORDINATING COMMITTEE ON 
GREAT LAKES BASIC HYDRAULIC 
AND HYDROLOGIC DATA. 
Constitution and duties. The Committee was formed on 
May 7, 1953 for the purpose of establishing a basis for 
development and acceptance by both countries 
(United States and Canada) of identical hydraulic and 
hydrologic data for the Great Lakes and their outflow 
1287

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
channels. The Committee was established advisory to 
the agencies of the United States and Canada which 
are charged with the responsibility for collecting and 
compiling the Great Lakes hydraulic and hydrologic 
data. Three working subcommittees, designated the 
River Flow Subcommittee, the Vertical Control 
Subcommittee and the Lake Level Subcommittee were 
formed to assist the Coordinating Committee in its 
work. Subsequently, a fourth subcommittee, designed 
the Physical Data Subcommittee, was formed. These 
subcommittees were directed to conduct the required 
technical studies through collaboration of the appropriate 
agencies of the United States and Canada. 
Members of the Committee for fiscal year. The United 
States members were Mr. H. F. Lawhead, Acting 
Chief, Engineering Division, U. S. Army Engineer, 
Division, North Central, Chairman, U. S. Section, Mr. 
B. G. DeCooke, Assistant Chief, Engineering Division, 
U. S. Army Engineer District, Detroit, and Mr. F. A. 
Blust, Chief, Engineering Division, Lake Survey 
Center, National Ocean Survey, Department of 
Commerce. Members for Canada were Dr. A. T. 
Prince, Director, Inland Waters Branch, Department 
of Energy, Mines and Resources, Chariman, Canadian 
Section, Mr. D. M. Ripley, Director, Marine Hydraulics 
Branch, Department of Transport and Mr. D. 
F. Witherspoon, Great Lakes St. Lawrence Study 
Office, Department of Energy, Mines and Resources. 
Operations during fiscal year. The Coordinating Committee 
held two meeting during the fiscal year; the first 
meeting took place in Niagara Falls, Ontario on 
September 17, 1969; the second meeting was held in 
Ottawa, Ontario on June 17,1970. 
The River Flow Subcommittee completed the work 
on Lake Superior outflow report. A study of rating of 
the compensating works in the St. Marys River was 
started, and the study of St. Clair River flows was 
continued. 
The Vertical Control and Lake Level Subcommittees 
completed a first draft of a report on Lake 
Erie water level gage histories. Work was continued on 
preparation of gage histories for Lake Michigan- 
Huron and the Straits of Mackinac. Leveling for the 
updating of IGLD (1955) was continued between Fort 
Niagara and Sturgeon Pt. Operation of seasonal gages 
for the Lake Ontario hydrostatic leveling study and for 
crustal movement studies was continued. 
The Physical Data Subcommittee completed coordination 
work of water surface and land areas of the 
Niagara River Basin. Work was continued on the 
determination of Lake Huron and Lake Superior water 
volume. 
2K. INTERNATIONAL GREAT LAKES 
STUDY GROUP 
Constitution and duties. The International Great Lakes 
Study Group is an informal organization including 
representatives of Canadian and U. S. agencies and 
institutions engaged in basic and applied research, and 
engineering investigations related to the development 
and utilization of the Great Lakes water resources. The 
Group was formed October 1962 as the Lake Erie Study 
Group and was later renamed the Great Lakes Study 
Group in recognition of the members interest in all the 
Great Lakes and its primary purpose is to facilitate the 
exchange of information and to provide informal 
coordination among the various research activities 
relating to the Lakes. The Group provides a forum for 
assisting,. coordinating and eliminating duplication. It 
also sponsors a data repository for the cataloging, 
storage and circulation of basic data. 
Members of the Group for fiscal year. The Steering 
Committee of the Study Group consists of up to six 
members from each country, including a Co-Chairman, 
an Alternate Co-Chairman and a Secretary. The 
United States members were Mr. C. F. MacNish, Chief 
Engineering Division, U. S. Army Engineer Division, 
North Central, U. S. Co-Chairman, until his retirement 
in April 1970 when he was replaced by Mr. 
Harley F. Lawhead, Acting Chief, Engineering Division; 
Mr. S. H. Fonda, Jr., Alternate Co-Chairman, 
Chief, Great Lakes Hydraulics Branch, U. S. Army 
Engineer Division, North Central; Mr. R. J. Schneider, 
Deputy Regional Director, Water Quality Office, 
Environmental Protections Agency, Region 5, Dr. D. 
C. Chandler, Director, Great Lakes Research Division, 
University of Michigan, Colonel L. J. Goodsell 
(retired), Executive Director, Great Lakes Commission 
and Mr. L. T. Crook, Director of Planning, Great 
Lakes Basin Commission. The Canadian members 
were Dr. A. D. Minener, Director, Great Lakes 
Institute, University of Toronto, Canadian Co-Chairman, 
Mr. T. L. Richards, Meteorological Service of 
Canada, Department of Transport, Dr. J. P. Burce, 
Director, Canada Centre for Inland Waters, Dr. A. M. 
McCombie, Ontario Department of Lands and Forrests 
and Mr. F. A. Voege, Assistant General Manager, 
Ontario Water Resources Commission. 
Operations during the fiscal year. The coordination of 
research activities has been maintained during the 
year. The Study Group met in Niagara Falls, Ontario 
on October 22 - 23, 1969 and in Chicago, Illinois on 
May 14 - 15, 1970. At these meetings, the Federal, State 
Provincial and University activities have been reported 
and discussed for the awareness of all entities and in 
order to avoid duplication. The Data Processing 
Subcommittee activities have continued and they have 
prepared and distributed a U. S. and Canadian 
Directory and Project Forecast for 1970. The Study 
Group Secretariat has initiated work to put together 
and proposes to update every year a Directory of 
Subject Thesis concerning the Great Lakes underway 
at the various U. S. and Canadian Universities and 
Institutes. The Study Group had continued its efforts to 
interest all agencies concerned with the Great Lakes 
into closer and coordinated research activities. The 
Ships and Facilities Schedules Subcommittee and the 
1288

MISCELLANEOUS CIVIL WORKS 
Navigation Subcommittee have continued their activities. 
2L. INTERNATIONAL LAKE SUPERIOR 
BOARD OF CONTROL 
Constitution and duties. The Board, established in 
pursuance of orders issued by the International Joint 
Commission May 26 and 27, 1914 is charged with the 
supervision of the operations of all compensating works 
and all power canals and appurtenances with a view to 
so controlling the outflow from Lake Superior as to 
maintain its level as nearly as may be between 
elevations 600.5 and 602.0 feet above mean water level 
at Father Point, Quebec (International Great Lakes 
Datum- 1955) and to so control the outflow as to 
prevent the level of the St. Marys River below the locks 
from exceeding elevation 582.9 
Members of the Board for fiscal year. Mr. R. H. Clark, 
Special Advisor to the Director, Inland Waters Branch, 
Department of Energy, Mines and Resources was the 
member of the Board for Canada. The Division 
Engineer, U. S. Army Engineer Division, North 
Central was the United States member, ex-officio. 
Brigadier General W. W. Watkin, Jr. was North 
Central Division Engineer, during the fiscal year. 
Operations during fiscal year. The Board kept in touch 
during the year with conditions pertaining to the 
regulation of Lake Superior through representatives of 
Canada and the United States on the ground and by 
means of regular and systematic reports of the water 
levels on Lake Superior, in the St. Marys River above 
and below the Sault Locks, and on Lake Huron. 
Records of discharge at Sault Ste. Marie through the 
rapids, navigation canals and power plants were also 
systematically reported to the Board. 
Change in the rate of outflow from Lake Superior 
are directed by the Board as indicated by the rule curve 
currently in use. During the past year the Board has 
continued the use of the modified plan of operation 
under the Rule of 1949 for the regulation of Lake 
Superior. 
During September through December 1969 the Lake 
Superior Board withheld about 38,000 cfs-months of 
water in Lake Superior, in relation to the outflow 
requirements of the current plan of regulation in order 
to compensate for the additional water which would be 
discharged later from the lake in carrying out a winter 
test program. 
The winter test operations were conducted at the 
Sault Ste.Marie control works in the St. Marys River, 
as part of the study being carried out by the 
International Great Lake Levels Board. The Board's 
Working Committee is determining the feasibility of 
discharging successfully 95,000 cfs under a greater 
variety of winter conditions than those which prevailed 
during the 1968-69 winter season. The winter tests have 
been carried out satisfactorily and no problems have 
arisen with regard to the winter operation of the gates 
or with any ice jamming on the lower St. Marys River 
under the increased flows. Detailed arrangements were 
made for continuous monitoring of the water levels in 
the lower St. Marys River so that at the first sign of any 
impending ice build-up, immediate preventive action 
would be taken by closing the required number of 
gates. Approval from the Great Lakes Power Corporation, 
which owns the Canadian portion of the 
control structure, was obtained for the operation of 
these gates for the winter test program. 
In accordance with the Board's instructions to the 
on-site representatives, the opening of the gates 
.commenced on February 9 and was successfully 
completed on February 11 despite very heavy ice 
conditions. During the ensuing weeks, continuous 
hydraulic monitoring and visual inspections of the river 
showed that it was again carrying the higher flow 
without difficulty. By the end of February it was 
apparent that river conditions were stable, with little 
likelihood of ice jams developing, and that little useful 
experience would be gained by prolonging the test 
period. The Board approved the recommendation of 
the Working Committee to discontinue the tests and 
return to the normal winter outflow. This operation 
was successfully carried out as a simulated emergency 
test without giving prior warning to the gate operating 
crew. This premature termination of the test has left 
approximately 20,000 cfs months of water in storage. 
Levels Board Working Committee plans to continue 
the winter tests during the 1970 - 71 winter season. In 
preparation for these tests, the Board has noted the 
request from the Committee that operations to store 
water be continued. In this regard, the Board authorized 
storage of about 13,000 cfs months during June 
1970. 
During its June 13, 1968 inspection of the Compensating 
Works in the St. Marys River, the Board 
noted that no work had been done to repair the noses of 
the piers in the Canadian portion of the Works. 
Becuase of high water in the lake during 1968 and the 
possibility of high water last year, the necessary pier 
maintenance was deferred. On the basis of reduced 
water supplies and consequent normal water levels, the 
Board decided to proceed with the necessary repairs. 
The Board has initiated a contract this summer for 
urgent repairs to these piers. 
Several letters written on behalf of property owners 
on the United States side of the lake, were received by 
the U. S. Members of the Board concerning high water 
conditions on the lake during the fiscal year. Appropriate 
replies were communicated in each case. No 
similar correspondence has been received by the 
Canadian Member of the Board. 
2M. INTERNATIONAL PRAIRIE PORTAGE 
BOARD OF CONTROL 
Constitution and duties. The International Prairie 
Portage Board of Control was formed by International 
1289

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Joint Commission for purpose of furnishing it with 
technical advice regarding suitability of dam structure 
at Prairie Portage, Lake County, Minn. After approval 
of plans by Department of the Army and International 
Joint Commission, the Board was retained to advise the 
Commission further regarding progress of construction 
and any other matters which might arise concerning 
this project. 
Members of the Board for fiscal year. Mr. J. D. McLeod, 
Senior Engineer, Inland Waters Branch, Department 
of Energy, 1Iines and Resources, represented Canada, 
and Col. Charles I. McGinnis, District Engineer, U. S. 
Army Engineer District, St. Paul, represented the 
United States. 
Operations during fiscal year. The U. S. Forest Service 
constructed a cofferdam before World War II but 
postponed work on the project during the war. On June 
12, 1968 after a period of heavy rains the cofferdam was 
washed out, resulting in lowering the lake levels of 
Birch, Sucker, Moose, Newfound and Ensign Lakes. 
This caused considerable difficulty for boating, as 
shallow water exists at the outlet of the lakes. By 
November 10, 1968 the U. S. Forest Service completed 
reconstruction of the Prairie Portage cofferdam which 
has been functioning satisfactorily at the control dam 
for the lakes. The reservoir was refilled by December 
25, 1968. The U. S. Forest Service recently revised the 
design of the proposed permanent dam which is 
expected to be submitted to the Board for approval. A 
special request was sent to the Bureau of Budget by the 
U. S. Forest Service for construction funds for starting 
the Prairie Portage Dam in fiscal year 1971. However, 
funds may not become available until fiscal year 1972. 
2N. INTERNATIONAL RAINY LAKE 
BOARD OF CONTROL 
Constitution and duties. The Convention between the 
United States and Canada, ratified by U. S. Senate 
August 30, 1940, provides in part that: "The International 
Joint Commission ... hereby clothed with 
power to determine when emergency conditions exist in 
the Rainy Lake watershed, in the event the Commission 
shall determine that such emergency conditions 
exist." On June 8, 1949, the Commission issued 
an order to the owners of dams at outlets of Namakan 
Lake and Rainy Lake, which provide for a method of 
regulation as recommended by International Rainy 
Lake Board of Control. The order provides for certain 
levels during the various seasons of the year as well as 
control of outflows, with view to securing most 
advantageous use of water in total to the various 
interests. A supplementary order dated October 1, 1957 
modified regulations for Namakan Lake to provide for 
some variation in operation based on anticipated 
spring runoff. This supplementary order was extended 
to October 1967 and again to October 1972, by action of 
the International Joint Commission on October 2, 1962 
and April 5,1967, respectively. 
Members of the Board for fiscal year. Mr. J. D. McLeod, 
Senior Engineer, Inland Waters Branch, Department 
of Energy, Mines and Resources, represented Canada, 
and Col. Charles I. McGinnis, District Engineer, U. S. 
Army Engineer District, St. Paul, represented the 
United States. 
Operations during fiscal year. Studies the past year by 
the Control Board have resulted in proposed revision of 
the Orders of Approval rule curves. The International 
Rainy Lake Board of Control met with the International 
Joint Commission in Ottawa in October 
1969 and again in April 1970 in Washington, D. C. to 
discuss proposed orders and rule curves. The International 
Joint Commission is presently drafting the 
final orders which are expected to be completed 
shortly. 
The members of the Board and their staffs met with 
resort and other property owners on April 13, 1970 at 
International Falls to discuss existing and forecast 
levels of the Rainy and Namakan Chain of Lakes. Due 
to above normal rains in May and June 1970, 
Namakan Dam was opened wide by 10 June and Rainy 
Dam by 1 June. Both continued discharging the 
maximum possible to the end of the fiscal year. 
20. INTERNATIONAL LAKE OF THE 
WOODS CONTROL BOARD 
Constitution and duties. The Convention between the 
United States and Great Britain proclaimed July 17, 
1925, provides for the regulation of the level of the Lake 
of the Woods in order to secure to the inhabitants of the 
United States and Canada the most advantageous use 
of the waters thereof, and of the waters flowing into and 
from the lake on each side of the boundary between the 
two countries. The Convention also provides for the 
Government of Canada to establish and maintain a 
Canadian Lake of the Woods Control Board to 
regulate and control outflow of waters of the lake, and 
for establishment and maintenance of an International 
Lake of the Woods Control Board, composed of two 
engineers, one representing the United States and the 
other representing Canada, to whose approval the rate 
of total discharge shall be subject whenever the water 
level rises about elevation 1061 or falls below elevation 
1056, sea level datum. 
Members of the Board for fiscal year. Mr.J. D. McLeod, 
Senior Engineer, Inland Waters Branch, Department 
of Energy, Mines and Resources, represented Canada 
and Colonel Charles I. McGinnis, District Engineer, 
U. S. Army Engineer District, St. Paul, represented the 
United States. 
Operations during fiscalyear. Maintained supervision to 
insure that every effort was being made to comply with 
the provisions of the Convention. One engineer of 
Colonel McGinnis' staff attended the September 16, 
1969 meeting of the Canadian Lake of the Woods 
Control Board in Winnipeg. On April 14, 1970, the St. 
Paul Deputy District Engineer and one staff engineer 
1290

MISCELLANEOUS CIVIL WORKS 
attended an open meeting with local interests at 
Warroad, Minnesota, sponsored by the International 
Lake of the Woods Control Board to discuss levels on 
Lake of the Woods. Two engineers of Colonel McGinnis' 
staff attended a meeting on June 17, 1970 on the 
Lake of the Woods Control Board in Winnipeg. All the 
above meetings were cooperative efforts of both the 
Canadian and the American members of the Control 
Board in arriving at the best solutions to the operating 
problems. Above normal rainfall in May and June 1970 
resulted in heavy runoff. Elevation 1061 was exceeded 
on 12 June at which time responsibility for the 
operation of Lake of the Woods was assumed by the 
International Lake of the Woods Control Board. The 
outflow from Lake of the Woods was actually increased 
to the maximum on June 3, 1970 and continued to the 
end of fiscal year 1970. 
2P. INTERNATIONAL PEMBINA RIVER 
ENGINEERING BOARD 
Constitution and duties. The Board was established 
April 3, 1962 by the International Joint Commission to 
investigate and report upon the measures which could 
be taken to develop the water resources of the Pembina 
River, Manitoba and North Dakota, and to reduce 
recurring flood losses in the basin. 
Members of the Board for fiscal year. The Board consists 
of three members from Canada and three from the 
United States. The Canadian members representatives 
were Mr. J. G. Watson, Chief Engineer, Department of 
Regional Economic Expansion, Department of Agriculture, 
Regina, Saskatchewan, Chairman of the 
Canadian Section; Mr. R. H. Clark, Chief, Engineering 
Division, Inland Waters Branch, Department 
of Energy, Mines and Resources, Ottawa, 
Ontario; and Mr. N. H. James, Hydraulic Engineer, 
Inlands Waters Branch, Department of Energy, Mines 
and Resources, Ottawa, Ontario. Mr. James succeeded 
the former member, Mr. M. V. Morris, during 1969. 
The United States representatives were Mr. N. B. 
Bennett, Jr., Assistant Commissioner, Bureau of 
Reclamation, Department of the Interior, Chairman of 
the U. S. Section; Mr. E. L. Bennett, Jr., Assistant 
Commissioner, Bureau of Reclamation, Department of 
the Interior, Chairman of the United States Section; 
Mr. E. L. Hendricks, Chief Hydrologist, Water 
Resources Division, U. S. Geological Survey, Department 
of the Interior; and the third member exofficio, 
was the District Engineer, U.S. Army Engineer 
District, St. Paul, Minnesota. The St. Paul District 
Engineer, Colonel Charles I. McGinnis, was appointed 
October 1969. 
Operations during fiscal year. The Board reports 
annually to the Commission. With regard to its assign 
ment, the Board submitted its report, dated December 
31, 1964, to the Commission. During June 1965 the 
Commission, with the Board in attendance, held public 
hearings in Manitou, Manitoba and Walhalla, North 
Dakota, where the views of concerned interests were 
presented relative to the information and conclusions 
in the Board's report. Subsequently, the Commission 
prepared a separate report, dated October 1967, which 
was furnished to the Governments of Canada and the 
United States. To date no action has been taken by 
either Government. 
2Q. INTERNATIONAL SOURIS-RED 
RIVERS ENGINEERING BOARD 
Construction and duties The Board was established 
April 3, 1948 by the International Joint Commission to 
investigate and report on the water resources of a broad 
area along the international boundary extending from 
the Milk River drainage basin in the west up to and 
including the drainage basin at the Red River of the 
North on the east. The Board reported in 1959 to the 
Commission that, with the possible exception of the 
Pembina River there were no significant problems on 
international streams within the terms of the January 
12, 1948 reference and assignment. It has been retained 
to investigate and report on the water and related 
problems of material concern to the two countries 
arising out of the operation of existing dams and other 
works or proposed water-related improvements, proposals 
for further uses of water by either of the two 
countries, recommendations concerning the apportionment 
between the two countries of those waters 
which cross the international boundary, and to 
investigate and review plans of mutual advantage to 
the two countries for the conservation, control, and use 
of the waters within the area of reference. 
Members of the Board for fiscal year. The Board consists 
of six members. The Canadian representatives were 
Mr. J. G. Watson, Chief Engineer, Department of 
Regional Economic Expansion, Department of Agriculture, 
Regina, Saskatchewan, Chairman of the 
Canadian Section; Mr. R. H. Clark, Chief Engineering 
Division, Inland Waters Branch, Department 
of Energy, Mines and Resources, Ottawa, 
Ontario; and Mr. N. H. James, Hydraulic Engineer, 
Inland Waters Branch, Department of Energy, Mines 
and Resources, Ottawa, Ontario. Mr. James succeeded 
the former member, Mr. M. V. Morris, during 1969. 
The United States representatives were Mr. N. B. 
Bennett, Jr., Assistant Commissioner, Bureau of 
Reclamation Department of the Interior, Washington, 
D. C.; Chairman of the U. S. Section; Mr. E. L. 
Hendricks, Chief Hydrologist, Water Resource Division, 
U. S. Geological Survey, Department of 
Interior; and the District Engieer U. S. Army Engineer 
District, St. Paul, Minnesota. The St. Paul District 
Engineer, Colonel Charles I. McGinnis, was appointed 
October 1969. 
Operations during the fiscal year. In accordance with the 
August 20, 1969 instructions from the International 
Joint Commission, the Engineering Board considered 
the survey reports for flood control prepared by the 
1291

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Corps of Engineers on the Souris River, North Dakota, 
and submitted appropriate comments. The Board 
found that the proposed channel improvement would 
have no effect on Canada and could proceed expeditiously. 
Authorization of the project was considered to 
be advisable to facilitate continued planning but 
construction of the proposed reservoir was not considered 
advisable until the Board could make additional 
studies of possible effects in Saskatchewan of 
storage to full design pool level during the occurence of 
the design flood and retention for extended periods of 
near-full pool levels after passage of the flood peak, and 
the effects in Manitoba of prolonged periods of high 
releases from the reservoir during reservoir drawdown. 
The Board reports annually to the Commission. 
Proposed operations. An Ad Hoc Task Force will be 
designated to make the studies requi red to delineate 
the effects of the proposed reservoir as identified in the 
Board's November 1969 report to the International 
Joint Commission and to submit a report to the Board 
on its findings. The Board will summarize the task 
force findings in a future report to the Commission. 
2R. INTERNATIONAL KOOTENAY LAKE 
BOARD OF CONTROL 
Constitution and duties. The Board was established 
November 11, 1938 to secure compliance with the 
provisions of the orders of approval of the International 
Joint Commission dated November 11, 1938, and 
August 5, 1949, relating to the construction and 
operation of control works by the Consolidated Mining 
and Smelting Co., of Canada, Ltd., through the West 
Kootenay Power and Light Co., Ltd., in and adjacent 
to the channel of the Kootenay River, and regulation 
of the levels of Kootenay Lake in the Province of 
British Columbia. 
Members of the Board for fiscalyear. Mr. H. T. Ramsden, 
District Engineer, Water Survey of Canada, Department 
of Energy, Mines and Resources, Vancouver, 
British Columbia, Chairman, Canadian Section, and 
Mr. A. F. Paget, Deputy Minister of Water Resources, 
Department of Lands, Forest and Water Resources, 
Victoria, British Columbia, for Canada; and Col. R. E. 
McConnell, District Engineer, U. S. Army Engineer 
District, Seattle, Wash., Chairman, U. S. Section, and 
Mr. W. L. Burnham, District Chief, Water Resources 
Division, U. S. Geological Survey, Boise, Idaho, for the 
United States. 
Operations during fiscal year. Although no formal 
meetings of the Board were held during the fiscal year 
Col. McConnell, Mr. Burnham and Mr. T. F. Smith 
(alternate to Mr. Ramsden) made a joint inspection 
visit to the area. The Board reported that the various 
dam and discharge control works operators regulated 
the level of Kootenay Lake within the prescribed limits 
of the Orders of Approval with only minor exceptions 
above the levels specified in the Orders of Approval. An 
annual report was submitted to the Commission. 
2S. INTERNATIONAL OSOYOOS LAKE 
BOARD OF CONTROL 
Constitution and duties. A special board of engineers was 
constituted to insure compliance with the provisions of 
the order of the International Joint Commission dated 
July 12, 1943, directing investigation of high-water 
conditions on the Okanogan River and studies of the 
relationships between certain obstructions, complained 
of in an application of the State of Washington, and the 
levels of Osoyoos Lake. The Board was enlarged from 
two to four members by an order of the Commission 
dated September 12, 1946, to carry out the provisions of 
the order relative to the operation of the Zosel Dam. 
Members of the Board for fiscal year. Mr. H. T. Ramsden, 
District Engineer, Water Survey of Canada, Department 
of Energy, Mines and Resources, Vancouver, 
British Columbia, Chairman, Canadian Section, and 
Mr. W. W. Ryan, District Director, Department of 
Public Works, Vancouver, British Columbia, for 
Canada; and Mr. L. B. Laird, District Chief, Water 
Resources Division, U. S. Geological Survey, Tacoma, 
Wash., Chairman, U. S. Section, and Col. R. E. 
McConnell, District Engineer, U. S. Army Engineer 
District, Seattle, Wash., for the United States. 
Operations during fiscal year. The Board did not meet 
during the year. The range in stage of Osoyoos Lake 
was within the normal limits. No reports or complaints 
of flood damage in the vicinity of Osoyoos Lake were 
received by the Board during the fiscal year. An annual 
report was submitted to the Commission. 
2T. INTERNATIONAL SKAGIT RIVER 
BOARD OF CONTROL 
Constitution and duties. The International Joint Commission 
approved on January 27, 1942 an application 
by the city of Seattle, Wash., to raise Ross Dam to 
impound Skagit River water to a maximum elevation 
1725 feet above mean sea level at the international 
boundary, subject to a binding agreement being 
entered into between the city of Seattle and the 
Government of British Columbia providing for indemnifying 
British Columbia for any injury that may 
be sustained by reason of the city's operations on the 
Skagit River. The Order of Approval provided for the 
appointment of the International Skagit River Board 
of Control, to consist of two members, one from the 
engineering services of Canada and the other from the 
engineering services of the United States, but the 
Commission did not establish the Board at that time. 
On January 10, 1967, the Province of British Columbia 
and the city of Seattle entered into a 99-year agreement 
permitting flooding of the lands of the Skagit River 
watershed in British Columbia up to elevation 1725 
feet, North American Datum (1927) as established by 
the Geodetic Survey of Canada. In a directive to the 
International Skagit River Board of Control dated July 
31, 1967, the Commission stated that the Board was 
established on April 4,1967. 
1292

MISCELLANEOUS CIVIL WORKS 
Members of the Board for fiscalyear. Mr. H. T. Ramsden, 
District Engineer, Water Survey of Canada, Department 
of Energy, Mines and Resources, Vancouver, 
British Columbia, for Canada, and Col. R. E. 
McConnell, District Engineer, U. S. Army Engineer 
District, Seattle, Wash., for the United States. 
Operations during the fiscalyear. The water surface at the 
international boundary reached a maximum elevation 
of 1603.48 feet on July 1,1969, as recorded by the gaging 
station, Skagit River, at the international boundary 
near Hope. The Board did not meet formally nor visit 
the area during the fiscal year. An annual report was 
submitted to the Commission. 
2U. COLUMBIA RIVER TREATY 
ENTITIES 
Constitution and duties. The Columbia River Treaty, 
which provides for the cooperative development of the 
water resources of the Columbia River Basin by the 
United States and Canada, was ratified on September 
16, 1964 by the two governments. Article XIV of the 
Treaty provided that each country should designate 
Entities to carry out the operating arrangements 
necessary to implement the Treaty. The principal 
recurring duties of the Entities include: establishment 
and operation of a hydrometeorological system; 
preparation of hydroelectric operating plans and flood 
control operating plans; determination of downstream 
power benefits; and assisting and cooperating with the 
Permanent Engineering Board in the discharge of its 
functions. 
Executive Order No. 11177 dated September 16, 1964 
designated the Administrator, Bonneville Power Administration 
and the Division Engineer, North Pacific 
Division, Corps of Engineers, as the United States 
Entity with the Administrator as Chairman. B. C. 
Hydro and Power Authority was designated as the 
Canadian Entity. To carry out their functions, the 
Entities organized two permanent international committees: 
the Columbia River Treaty Operating Committee 
and the Columbia River Treaty Hydrometeorological 
Committee. The United States 
Entity also appointed a Secretary and two Coordinators 
one from the Bonneville Power Administration 
and one from the Corps of Engineers. The 
Canadian Entity appointed a Manager, Coordinators 
and Secretary. 
Members for fiscalyear. Membership of the Entities and 
its committees consisted of Mr. H. R. Richmond, 
Administrator, Bonneville Power Administration, and 
BG R. S. Kelly, Division Engineer, North Pacific 
Division, Corps of Engineers, as chairman and member 
of the United States Entity. The Honorable R. G. 
Williston, Minister of Lands, Forest and Water 
Resources, British Columbia, and Director of B. C. 
Hydro and Power Authority was the incumbent 
Chairman of the Canadian Entity. Messrs. B. Goldhammer, 
Assistant Administrator for Power Man- 
451-584 0-72-82 
agement, BPA, and Mr. G. H. Fernald, Jr., Chief, 
Engineering Division, NPD, served as U. S. Entity 
Coordinators. Mr. W. D. Kennedy of B. C. Hydro and 
Power Authority was Manager, Canadian Entity 
Services and Mr. H. Kropitzer, Executive Assistant to 
the Administrator, BPA, was U. S. Entity Secretary. 
Membership on the Columbia River Treaty Operating 
Committee was as follows: The U. S. Section of 
the Committee consisted of Messrs. C. E. Hildebrand 
(co-chairman) and D. J. Lewis of the Corps of 
Engineers and H. M. McIntyre (co-chairman) and C. 
W. Blake of the Bonneville Power Administration. The 
Canadian Section was comprised of Messrs. P. R. 
Purcell (chairman), D. R. Forest, and W. E. Kenny, all 
of B. C. Hydro and Power Authority. Membership on 
the Columbia River Treaty Hydrometeorological 
Committee was Messrs. F. A. Limpert of BPA 
(chairman) and D. M. Rockwood of the Corps of 
Engineers, for the U. S. Section and Messrs. P. R. 
Purcelll (chairman) and U. Sporns, both of B. C. 
Hydro, for the Canadian Section. 
Operations during the fiscal year. The previously completed 
Duncan and Arrow projects were operated in a 
normal manner in accordance with the "Detailed 
Operating Plan for Canadian Storage - July 1, 1969 
through July 31, 1970," dated October 2, 1969. 
Construction of the Libby and Mica projects continued 
on schedule with the closure date for Libby set for May 
1972 and Mica for April 1973. 
The Entities and their Coordinators and Committees 
met on numerous occasions during the fiscal 
year. Two regular meetings of the Entities were held. 
The Entities met with the Permanent Engineering 
Board on February 18,1970. 
The Entities issued a "Report of the Columbia River 
Treaty, Canadian and United States Entities, for the 
period October 1, 1968 to September 30, 1969," dated 
April 1970. The Columbia River Treaty Operating 
Committee prepared three reports: "Hydroelectric 
Operating Plan for Canadian Storage, Operating Year 
1975-76," dated July 1, 1970; "Determination of 
Downstream Power Benefits Resulting from Canadian 
Storage for Operating Year 1975-76," dated June 30, 
1970; and a "Report on Operation of Columbia River 
Treaty Projects, April 1, 1967 through July 31, 1969" 
dated December 1969. In August 1970, the Entities 
agreed on "Interim Plan for Exchange of Hydromet 
Data-Recommendation No. 6 of the Hydrometeorological 
Committee" dated May 28,1969. 
2V. COLUMBIA RIVER TREATY 
PERMANENT ENGINEERING BOARD 
Constitution and duties. The Columbia River Treaty, 
which provides for co-operative development of the 
water resources of the Columbia River basin, was 
signed on January 17, 1961 by representatives of the 
United States and Canada. Article XV of the Treaty 
established a Permanent Engineering Board consisting 
.93

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
of four members, two from each country. Pursuant to 
Executive Order No. 11177 dated September 16, 1964 
the Secretary of the Army and the Secretary of the 
Interior on December 7, 1964 appointed two members 
and two alternate members to form the U. S. Section of 
the Board. The general duties and responsibilities of 
the Board as set in the Treaty and related documents 
are to: (a) assemble certain records of flow; (b) report 
any substantial deviation from operating plans and to 
recommend adjustments; (c) assist the Entities in 
reconciling technical and operational differences; (d) 
make periodic inspections and require reports with a 
view to insuring that objectives of the Treaty are being 
met; (e) make annual and special reports to the 
Governments (f) investigate and report other matters at 
the request of either Government; and (g) consult with 
the Entities in establishing and operating a hydrometeorological 
system for the basin. 
Members of the Board for fiscal year. The Canadian 
members were Mr. G. M. MacNabb, Assistant Deputy 
Minister, Energy Development, Department of Energy, 
Mines and Resources, Ottawa, Ontario, 
(Chairman of the Canadian Section), and Mr. A. F. 
Paget, Consulting Engineer, Victoria, British Columbia. 
The United States members were Mr. W. E. 
Johnson, Chief, Engineering Division, Civil Works 
Directorate, U. S. Army, Office, Chief of Engineers, 
Washington, D. C. (Chairman of the United States 
Section), and Mr. M. D. Dubrow, Assistant and Chief 
Engineering Research Advisor, Office of the Assistant 
Secretary for Water and Power Development, Department 
of the Interior, Washington, D. C. 
Operations during the fiscal year. The Board visited the 
Mica and Libby project sites on August 26-27, 1969 to 
assess construction progress. The Board also met on 
February 17, 1970 to review progress, and met in a joint 
meeting with the Entities on February 18, 1970. The 
Board sent its 5th annual report for the period ending 
September 30, 1969 to both governments on December 
31, 1969: The annual report summarizes activities of 
the Permanent Engineering Board and the Entities, the 
progress on construction of the Treaty projects and 
studies underway. Operations of Arrow and Duncan 
reservoirs and related benefits accrued are described. 
The report also records the conclusion of the Board 
that the objectives of the Treaty are being met. 
1294

MISCELLANEOUS CIVIL WORKS 
TABLE 48-A MISCELLANEOUS CIVIL WORKS: APPROPRIATIONS AND EXPENDITURES 
(See Section 1 of Text) 
Appropriations 
For investigations, inspections, hearings, reports, service of notice or other action incidental to examination of plans or sites of structures 
built or proposed to be built in or over navigable waters or to examinations into alleged violations of law for the protection 
and preservation of navigable waters of the United States or to the establishment of marking of harbor lines. 
Allotted during year .................................. $2,177,535 
(These funds were allotted from river and harbor appropriation in accordance with the provisions 
of sec. 6, River and Harbor Act of Mar. 3, 1905). 
For the investigation and removal of sunken vessels: 
Balance on hand July 1, 1969 ....................................... 408,124 
Allotted during year (net) ........................................... 944,786 
(These funds were allotted from the appropriation "Operation and Maintenance, General, 
Protection of Navigation, Removal of Sunken Vessels and Other Obstructions"). 
Total ....................................... ... ..... $3,530,445 
Expenditures. Total expenditures for fiscal year exclusive of outstanding liabilities, amounting to $225,891, were 
$3,041,586 expended as follows: 
For investigations, inspections, hearings, and other action incidental to 
administration of Federal laws..................................... $2,177,535 
For removal of sunken vessels ...................... .............. 864,051 
Total ................................................... $3,041,586 
Total funds available......... .................................. $3,530,445 
Total expenditures ......................... $3,041,586 
Outstanding liabilities.... . .................... 225,891 $3,267,477 
Balance available June 30, 1970 $ 262,968 
1295 
U. S. GOVERNMENT PRINTING OFFICE: 1972 0 - 451-994

INDEX 
The following abbreviations are used in the index: 
BERH Board of Engineers for Rivers and Harbors 
CDC California Debris Commission 
CERC Coastal Engineering Research Center 
LMK Vicksburg, Miss., District 
LMM Memphis, Tenn., District 
LMN New Orleans, La., District 
LMS St. Louis, Mo., District 
MR&T Mississippi River and Tributaries Project 
MRK Kansas City, Mo., District 
MRO Omaha, Nebr., District 
NAB Baltimore, Md., District 
NAN New York, N.Y., District 
NAO Norfolk, Va., District 
NAP Philadelphia, Pa., District 
NCB Buffalo, N.Y., District 
NCC Chicago, Ill., District 
NCE Detroit, Mich., District 
NCL U.S. Lake Survey 
NCR Rock Island, Ill., District 
NCS St. Paul, Minn., District 
NED New England Division 
NPA Alaska District 
NPP 
NPS 
NPW 
ORD 
ORH 
ORL 
ORN 
ORP 
POD 
SAJ 
SAM 
SAN 
SAS 
SAW 
SPK 
SPL 
SPN 
SWA 
SWF 
SWG 
SWL 
SWT 
A 
Abbapoola Creek, S.C. (SAN) 272 
Aberdeen Creek, Va. (NAO) 223, 756 
Aberdeen, Ohio (ORH) 762, 760 
Abilene Channel Improvement, Tex. (SWF) 508, 522 
Abilene, Kan. (MRK) 637, 638 
Abilene, Smoky Hill River, Kansas (MRK) 636 
Abiquiu Dam, Rio Chama, N. Mex. (SWA) 539, 544, 547, 550 
Absecon Creek, N.J. (NAP) 150 
Absecon Inlet, N.J. (NAP) 129, 143 
Accotink Creek, Va. (NAB) 192 
Adams Creek, S. C. (SAN) 259, 267 
Adams levee, Indiana (Wabash River) (ORL) 726 
Adams, Mass., Hoosic River (NAN) 126 
Addison, N. Y. (NAB) 172, 195, 196 
Adena, Ohio (ORP) 795, 798 
Ala Wai Small Boat Harbor, Oahu, Hawaii (POD) 1093 
Alabama-Coosa Rivers, Ala., and Ga. (SAM) 348, 360, 376 
Alabama River at Montgomery, Ala. (SAM) 375 
Alameda Creek, Calif. (SPL) 1033, 1041, 1045 
Alamo Reservoir, Bill Williams River, Ariz. (SPL) 995, 1007 
Alamogordo diversion channel. Tularosa Basin, N. Mex. (SWA) 
549 
Albany, Oreg. (NPP) 1141 
Albeni Falls Dams and Reservoir, Pend Oreille River, Idaho (NPS) 
1157, 1162, 1166 
Albuquerque diversion channels project, New Mexico (SWA) 533, 
544, 546 
Portland, Oreg., District 
Seattle, Wash., District 
Walla Walla, Wash., District 
Ohio River Division 
Huntington, W. Va., District 
Louisville, Ky., District 
Nashville, Tenn., District 
Pittsburgh, Pa., District 
Pacific Ocean Division 
Jacksonville, Fla., District 
Mobile, Ala., District 
Charleston, S.C., District 
Savannah, Ga., District 
Wilmington, N.C., District 
Sacramento, Calif., District 
Los Angeles, Calif., District 
San Francisco, Calif., District 
Albuquerque, N. Mex., District 
Fort Worth, District 
Galveston, Tex., District 
Little Rock, Ark., District 
Tulsa, Okla., District 
Algoma Harbor, Wis. (NCC) 893 
Alhambra Creek, Calif. (SPN) 1049 NMBall Mountain Lake, Vt. 
(NED) 24, 51, 74 
Allatoona Reservoir, Coosa River Basin, Ga. (SAM) 349, 360 
Allegany, N.Y., unit 1 (Allegheny River) (ORP) 795, 798 
Allegany, N.Y., unit II (Five Mile Creek Area) (ORP) 795, 798 
Allegheny River, Pa. (ORP) 765, 786, 790, 792, 794 
Allentown, Lehigh River, Pa. (NAP) 152 
Alloway Creek, N. J. (NAP) 150 
Alma Harbor, Wis. (NCD) 849 
Almond Reservoir, N. Y. (NAB) 170, 194, 196 
Almond Village, N. Y. (NAB) 196 
Aloha-Rigolette Area, Grant and Rapides Parishes, La. (LMN) 
423, 424 
Alpena Harbor, Mich. (NCE) 898, 922, 928 
Altamaha, Oconee and Ocmulgee Rivers, Ga. (SAS) 275, 282 
Alton, Ill. (LMS) 461 
Alton, Ohio River Basin, Ind, (ORL) 726 
Altus Dam and Reservoir, Okla. (SWT) 604, 605 
Alum Creek Lake, Ohio (ORH) 736, 751 
Alvin R. Bush Reservoir, Pa. (NAB) 176 
Amazon Creek, Oreg. (NPP) 1141 
American Falls International Board 1285 
American Lake, Vicinity of Fort Lewis, Wash. (NPS) 1171 
American River,, Calif. (SPK) 1083 
Ames Lake, Skunk River, Iowa (NCR) 826, 833, 836 
Amite River and Bayou Manchac, La. (LMN) 421 
Amite River and tributaries, La. (LMN) 424 
Amite River, La. (MR&T) 1230 
1297

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Amsterdam, Ohio (ORP) 797, 798 
Anacortes Harbor, Wash. (NPS) 1147, 1160, 1164 
Anacostia River and Flats (NAB) 192 
Anacostia River and Tributaries, flood protection and navigation 
improvements, D. C. and Md. (NAB) 166, 182 
Anacostia River and Tributaries, Prince Georges County, Md. 
(NAB) 167, 182 
Anaheim Bay Harbor, Orange County, Calif. (SPL) 1014 
Anahuac Channel, Tex. (SWG) 471 
Anchorage Harbor, Alaska (NPA) 1199, 1208, 1210 
Anclote River, Fla. (SAJ) 320 
Andalusia Harbor, Ill. (NCD) 849 
Andover Reservoir, Conn. (NED) 77, 78 
Andrews River, Mass. (NED) 2, 47 
Annapolis Harbor, Md. (NAB) 192 
Ansonia-Derby, Conn. (NED) 33, 53, 75 
Antelope Creek, Hazen, N. Dak. (MRO) 663 
Anthony Shoals, Ga. (SAS) 284 
Apalachicola Bay, Fla. (SAM) 332, 357 
Apalachicola, Chattahoochee, and Flint Rivers, Ala., Ga., and Fla. 
(SAM) 351, 361, 376 
Apoon Mouth of Yukon River, Alaska (NPA) 1212 
Applegate Reservoir, Rogue River Basin, Oreg. (NPP) 1108, 1125 
Appomattox River, Va. (NAO) 223 
Apponaug Cove, R. I. (NED) 68 
Appoquinimink River, Del. (NAP) 150 
Aquashicola Reservoir, Pa. (NAP) 152 
Aquatic Plant Control (Buffalo District) (NCB) 943, 963 
Aquatic Plant Control (Charleston District) (SAN) 259, 267, 272 
Aquatic Plant Control (Galveston District) (SWG) 463, 477, 491, 
481,493 
Aquatic Plant Control (Jacksonville District) (SAJ) 287, 307, 320 
Aquatic Plant Control, (Mobile District) (SAM) 332, 357, 374 
Aquatic Plant Control, (New Orleans District) (LMN) 380, 407 
Aquatic Plant Control, (New York District) (NAN) 81, 112 
Aquatic Plant Control, (Norfolk District) (NAO) 202, 215 
Aquatic Plant Control, (Phila. District) (NAP) 130, 143 
Aquatic Plant Control, (Sacramento District) (SPK) 1083 
Aquatic Plant Control, (Savannah District) (SAS) 276, 282, 284 
Aquatic Plant Control, (Wilmington District) (SAW) 225, 247, 254 
Aquia Creek, Va. (NAB) 192 
Aquilla Reservoir, Aquilla Creek, Texas (SWF) 527, 530 
Arbuckly Dam and Reservoir, Rock Creek, Okla. (SWT) 604 
Arcadia, Mich. (NCE) 940 
Arecibo Harbor, Puerto Rico (SAJ) 320 
Ark-Red Chloride Control, Part I, Tex. (SWT) 576, 592 
Ark-Red Chloride Control, Supplemental Studies, Okla. (SWT) 
576, 592 
Arkabutla Reservoir (MR&T) 1225, 1235 
Arkansas-Red River Chloride Control, Texas, Oklahoma and 
Kans. (SWT) 576, 697, 601 
Arkansas River and Tributaries, Ark. and Okla. (SWT) 572 
Arkansas River at North Little Rock, Ark. (SWL) 572 
Arkansas River, Bank Revetments & Dikes (MR&T) 1243 
Arkansas River Basin, Ark., Okla., and Kans. (SWT) 551,561, 564, 
574 
Arkansas River Levees (MR&T) 1249 
Arkport Reservoir, N. Y. (NAB) 170, 194, 196 
Arlington, Alkali Canyon, Ore. (NPW) 1191 
Arlington Lake, Gasconade River, Mo. (MRK) 636, 638 
Armuchee Creek, Ga. (SAM) 375 
Ash Creek, Willamette River, Oreg. (NPP) 1141 
Ash Swale, Salt Creek, Oreg. (NPP) 1141 
Ashland City, Tenn. (ORN) 697 
Ashland Harbor, Wis. (NCS) 820, 821 
Ashland, Ky. (ORH) 762, 756 
Ashley River, S. C. (SAN) 272 
Ashtabula Harbor, Ohio (NCB) 944, 963, 967 
Asotin Dam, Snake River, Idaho and Wash. (NPW) 1198, 1189 
Atchafalaya Basin, La. (MR&T) 1223, 1229, 1241, 1247 
Atchafalaya River and Bayous Chene, Boeuf, and Black, La. 
(LMN) 380, 407 
Atchafalaya River, Morgan City to Gulf of Mexico, La. (LMN) 
381, 407 
Atchafalaya River (MR&T) 1230 
Atchison, White Clay Creek, Kans. (MRK) 608, 626, 637 
Athalia, Ohio (ORH) 762, 756 
Athens, Ohio (ORH) 737, 751, 762 
Atlantic Beach Channels, N. C. (SAW) 254 
Atlantic City, N. J. (NAP) 138, 144 
Atlantic Coast of N. J., Sandy Hook to Barnegat Inlet (NAN) 125 
Atlantic Gulf Ship Canal, Fla. (SAJ) 320 
Atlantic Intracoastal Waterway between Norfolk, Va., and St. 
Johns River, Fla. (Charleston District) (SAN) 260, 267 
Atlantic Intracoastal Waterway between Norfolk, Va., and St. 
Johns River, Fla. (Jacksonville District) (SAJ) 320 
Atlantic Intracoastal Waterway between Norfolk, Va., and St. 
Johns River, Fla. (Norfolk District) (NAO) 201, 215, 221 
Atlantic Intracoastal Waterway between Norfolk, Va., and St. 
Johns River, Fla. (Savannah District) (SAS) 276, 282 
Atlantic Intracoastal Waterway between Norfolk, Va., and St. 
Johns River, Fla. (Wilmington District) (SAW) 226, 247 
Auburn, N. Y., Owasco Outlet (NCB) 977 
Augusta, Ky. (ORH) 762, 756, 760 
Augusta Levee Kans. (SWT) 603, 605 
Aurora, Ohio River Basin, Ind. (ORL) 732, 726 
AuSable Harbor at AuSable River (Oscoda), Mich. (NCE) 898, 
922, 928 
Avoca, N. Y. (NAB) 172, 196 
Avon Harbor, N. C. (SAW) 227, 247 
Aycock Swamp Reservoir, N. C. (SAW) 255 
B 
B. A. Steinhagen Lake, Tex. (SWF) 506, 522 
Bachelor Island, Wash. (NPP) 1138, 1140 
Back Creek, Md. (NAB) 192 
Bagaduce River, Maine (NED) 68 
Bailey, R. D., W. Va. (ORH) 745, 753 
Baker Brook, (NED) 37, 54, 76 
Bakers Haulover Inlet, Fla. (SAJ) 320 
Bakers Mill Reservoir, N. C. (SAW) 255 
Baldwin and Hannon Sloughs, Montgomery, Ala. (SAM) 346, 360 
Ballona Creek channel and jetties, Calif. (SPL) 1015, 1016, 1017, 
1019 
Baltimore Harbor and Channels, Md. (NAB) 154, 180, 215 
Baltimore Harbor and Channels (Norfolk District) (NAO) 203 
Baltimore Harbor, Md., Collection and Removal of Drift (NAB) 
155, 180 
Bank stabilization and channel rectification, Ark. (SWL) 567, 568, 
552, 561,566 
Bank Stabilization and Channel Rectification, Arkansas River, Fort 
Smith, Ark., to Robert S. Kerr lock and dam, Okla. (SWT) 566, 
592, 597, 574 
Bank Stabilization, Red River, Ark. (SWT) 603 
Bar Harbor, Maine (NED) 68 
Barataria Bay Waterway, La. (LMN) 381,407 
Barbers Point Harbor, Oahu, Hawaii (POD) 1085, 1090, 1091 
Barbourville, Ky. (ORN) 696 
Barcelona Harbor, N. Y. (NCB) 976 
Bardwell Lake, Tex. (SWF) 509, 522, 526, 529 
See page 1297 for District abbreviations. 1298

INDEX 
Barkley Dam and Lake Barkley, Ky. and Tenn. (ORN) 697 
Barnegat Inlet, N. J. (NAP) 130, 143 
Barnegat Light, N. J. (NAP) 151 
Barnett Creek, Ky. (Rough River Basin) (ORL) 726 
Barre Falls Dam, Mass. (NED) 24, 51, 74 
Barren River Lake, Ky. (ORL) 699, 701, 718, 729 
Bartley, Republican River, Nebr. (MRK) 636, 638 
Bass Harbor Bar, Maine (NED) 68 
Bass Harbor, Maine (NED) 68 
Bastrop Bayou, Tex. (SWG) 491 
Batavia and vicinity, Tonawanda Creek, N. Y. (NCB) 977 
Bath, N. Y. (NAB) 172, 196 
Baton Rouge Harbor (Devils Swamp), La. (MR&T) 1224, 1239 
Battle Creek, Kalamazoo River, Mich. (NCE) 941 
Battle Creek, Nebr. (MRO) 662 
Baudette Harbor, Minn. (NCS) 821 
Bay City Harbor, Wis. (NCD) 849 
Bay Port Harbor, Mich. (NCE) 939, 940 
Bay Ridge and Red Hook Channels, N. Y. (NAN) 82, 112 
Bay River, N. C. (SAW) 254 
Bayard, W. Va. (NAB) 198 
Bayfield Harbor, Wis. (NCS) 821 
Bayou Bartholomew and tributaries, Ark. and La. (LMK) 430, 436, 
432, 433, 435 
Bayou Bartholomew, La. and Ark. (LMK) 430, 432, 435, 436 
Bayou Bodcau and tributaries, Ark., and La. (LMN) 398, 409, 422 
Bayou Bodcau, Red Chute and Loggy Bayou, La. (LMN) 423, 424 
Bayou Boeuf (MR&T) 1230 
Bayou Boufouca, La. (LMN) 421 
Bayou Choupique, La. (LMN) 424 
Bayou Cocodrie and Tributaries, La. (MR&T) 1224, 1230 
Bayou Coden, Ala. (SAM) 333, 357 
Bayou D'Arbonne and Corney, La. (LMK) 435 
Bayou D'Arbonne and Corney, La. (LMK) 435 
Bayou Dorcheat, Loggy Bayou and Lake Bisteneau, La. (LMN) 
421 
Bayou Dupre, La. (LMN) 421 
Bayou Galere, Miss. (SAM) 374 
Bayou Grosse Tete, La. (LMN) 421 
Bayou La Batre, Ala. (SAM) 333, 357 
Bayou Lacombe, La. (LMN) 421 
Bayou Lafourche and Lafourche-Jump Waterway, La. (LMN) 382, 
407 
Bayou Nicholas, Coushatta, La. (LMN) 424 
Bayou Pierre, La. (LMN) 399, 409, 422, 423, 424 
Bayou Plaquemine Brule, La. (LMN) 421 
Bayou Queue de Tortue, La. (LMN) 383, 407 
Bayou Rapides, La. (LMN) 424 
Bayou Segnette Waterway, La. (LMN) 384, 407 
Bayou Teche and Vermillion River, La. (LMN) 384, 407 
Bayou Teche, La. (LMN) 385, 407, 418 
Bayou Terrebonne, La. (LMN) 421 
Bayou Vermillion, La. (LMN) 421 
Bayous LaLoutre, St. Malo and Yscloskey, La. (LMN) 383, 407 
Bayport, Fla. (SAJ) 288, 307 
Beals Harbor, Maine (NED) 68 
Bear Creek at Hannibal, Mo. (NCR) 839 
Bear Creek Dam and Lake, Colo. (MRO) 641,653 
Bear Creek, Kendrick Idaho, (NPW) 1175, 1187 
Bear Creek, Long Tom River, Oreg. (NPP) 1141 
Beards Brook Reservoir, N. H. (NED) 78 
Beatrice, Big Blue River, Nebr. (MRK) 636, 638 
Beaufort Harbor, N. C. (SAW) 227, 247 
Beaulahtown Reservoir, N. C. (SAW) 255 
Beaver and Mahoning Rivers, Pa. and Ohio (ORP) 794 
Beaver Bay Harbor, Minn. (NCS) 821 
Beaver Brook Lake, N. H. (NED) 24, 51, 74 
Beaver Creek, Crabtree Creek, Oreg. (NPP) 1141 
Beaver Creek, Montezuma, Ga. (SAM) 375 
Beaver Creek near Tillamook, Oreg. (NPP) 1141 
Beaver Drainage District, Columbia County, Oreg. (NPP) 1139, 
1140 
Beaver Drainage District Oreg. (NPP) 1138 
Beaver Lake, Ark. (SWL) 551, 558, 562, 570 
Bedford, East Fork 102 River, Iowa (MRK) 609, 626, 637 
Beech Fork Lake, W. Va. (ORH) 737, 751 
Belfast Harbor, Maine (NED) 68 
Bell Foley Lake, Ark. (SWL) 570, 571 
Bellaire, Ohio (ORP) 795, 798 
Bellamy River, N. H. (NED) 68 
Belle Fourche, Cheyenne River, S. Dak. (MRO) 662 
Belle Fourche, Redwater River and Hay Creek, S. Dak. (MRO) 
662 
Belle River, Marine City, Mich. (NCE) 939, 940 
Bellevue Harbor, Iowa (NCD) 849 
Bellevue, Ohio River Basin, Ky. (ORL) 732, 726 
Bellhaven Harbor, N. C. (SAW) 254 
Bellingham Harbor, Wash. (NPS) 1148, 1160, 1164, 1170 
Belpre, Ohio (ORH) 762, 756 
Belton Lake, Tex. (SWF) 509, 522, 527, 530, 526 
Beltzville Lake, Pa. (NAP) 139, 144 
Benbrook Lake, Tex. (SWF) 509, 522, 526, 529 
Bennington, Hoosic River Basin, Vt. (NAN) 98, 114 
Bennington Reservoir, N. H. (NED) 78 
Beresford Creek, S. C. (SAN) 272 
Berkeley Harbor, Calif. (SPN) 1047 
Berlin Lake, Ohio River Basin, Ohio (ORP) 769, 786 
Bethel Small Boat Harbor, Alaska (NPA) 1200, 1208, 1210 
Bethlehem, Pa. (NAP) 152 
Bettendorf, Iowa (NCR) 839 
Betterton Harbor, Md. (NAB) 192 
Beverly Harbor, Mass. (NED) 68 
Big Bay Harbor, Mich. (NCS) 801, 814 
Big Bend Dam and Lake Sharpe, Missouri River Basin, S. Dak. 
(MRO) 650, 655, 659 
Big Bend, W. Va. (ORH) 763, 758 
Big Black River, Miss. (LMK) 435 
Big Blue Dam and Reservoir, Ind. (ORL) 729 
Big Creek and L'Anguille River, White River Basin, Ark. (LMM) 
444 
Big (Cunningham)Creek, Ohio (NCB) 976 
Big Darby Reservoir, Ohio River Basin, Ohio (ORH) 758 
Big Dry Creek Reservoir and Diversion, Calif. (SPK) 1083 
Big Fossil Creek, Tex. (SWF) 510, 522, 531 
Big Hill Lake, Verdigris River Basin, Kans. (SWT) 577, 592, 597 
Big Pigeon and Little Pigeon Bayous, La. (LMN) 421 
Big Pine Lake, Ind. (ORL) 699, 701, 718 
Big Pine Lake, Tex. (SWT) 605 'R 58700.0 264264, 268 
Big Run, Pa. (ORP) 797, 798 
Big Sandy River, W. Va. and Ky., including Levisa and Tug Forks 
(ORH) 755 
Big Sioux River at Sioux City, Iowa & S. Dak. (MRO) 641, 653, 
658 
Big Stone Lake and Whetstone River, Minn. and S. Dak. (NCS) 
806, 815 
Big Stranger Creek, Kans. (MRK) 637, 638 
Big Suamico, Wis. (NCC) 893 
Big Sunflower River, Miss. (LMK) 435 
Big Sunflower River (MR&T) 1225, 1233, 1254 
Big Swan Drainage and Levee District, Illinois River, Ill. (LMS) 
461 
Big Timber Creek, N.J. (NAP) 150 
See page 1297 for District abbreviations. 1299

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Big Walnut Dam and Lake, Ind. (ORL) 699, 702, 718, 729 
Big Walnut, Ohio (ORH) 760 
Big Wash., Milford, Beaver County, Utah (SPK) 1083 
Billings, Mont. (MRO) 641, 653 
Biloxi Harbor, Miss. (SAM) 334, 357 
Binghamton, N. Y. (NAB) 170, 195, 196 
Birch Hill Dam, Mass. (NED) 25, 52, 74 
Birch Lake, Okla., (SWT) 605 
Birch, W. Va. (ORH) 763, 758, 760 
Bird Rock area, La Jolla, San Diego County, Calif. (SPL) 1014 
Birds Point - New Madrid Floodway (MR&T) 1256 
Biscayne Bay, Fla. (SAJ) 327 
Black Bayou Lake, La. (LMN) 423, 424 
Black Bayou-Pine Island Area, La. (LMN) 424 
Black Creek, Gadsden, Ala. (SAM) 375 
Black Creek Reservoir, N. C. (SAW) 255 
Black Fork at Hendricks, W. Va. (ORP) 770, 786 
Black River, Ark. and Mo. (SWL) 569 
Black River at Pocahontas, Ark. (SWL) 572 
Black River Harbor, N. Y. (NCB) 976 
Black River, Harnett County, N. C. (SAW) 233, 248, 254 
Black River, La. (MR&T) 1231 
Black River, Mich (NCS) 820, 821 
Black River, Poplar Bluff, Mo. to Knobel, Ark. (SWL) 571 
Black River, Port Huron, Mich. (NCE) 899, 922, 928 
Black River, Wis. (NCS) 821 
Black Rock Channel and Tonawanda Harbor, N. Y. (NCB) 944, 
963, 967 
Black Rock Lake, Conn. (NED) 33, 53, 75 
Black Walnut Harbor, Md. (NAB) 192 
Black Warrior and Tombigee Rivers, Ala. (SAM) 334, 357, 372, 
373 
Blackbird Creek, near Macy, Nebr. (NRO) 642, 653 
Blackfoot Area, Snake River, Columbia River Basin, Idaho (NPW) 
1190, 1191 
Blackfoot Reservoir, Blackfoot River, Idaho (NPW) 1176, 1187 
Blackfoot River, Columbia River Basin, Idaho (NPW) 1190, 1189, 
1191 
Blackstone River Basin, Mass. and R.I. (NED) 22, 73 
Blackwater Dam, N. H. (NED) 37, 54, 76 
Blackwater River, Fla. (SAM) 336, 357 
Blackwater River, Va. (NAO) 223 
Blaine Harbor, Wash. (NPS) 1169, 1170 
Blieders Creek Lake, Texas (SWF) 530 
Blind Slough Diking District, Clatsop County, Oreg. (NPP) 1139 
Bloomington Lake, North Branch, Potomac River, Md. and Va. 
(NAB) 167, 182 
Blue Earth River, Minn. (NCS) 823 
Blue Marsh Lake, Pa. (NAP) 139, 144 
Blue Mountain Lake, Ark. (SWL) 551, 554, 561, 567 
Blue River Lake, Oreg. (NPP) 1109, 1125, 1136, 1137 
Blue River, Seward, Nebr. (MRK) 637 
Bluestone Lake, Ohio River Basin, W. Va. (ORH) 737, 751, 758 
Bluff Creek, Miss. (SAM) 374 
Board of Engineers for Rivers and Harbors (BERH) 1215 
Bodega Bay, Calif. (SPN) 1047 
Bodie Island, N. C. (SAW) 256 
Boeuf and Tensas Rivers (MR&T) 1224, 1225, 1231, 1254 
Boeuf River, La. (LMK) 435 
Bogue Chitto, La. (SAM) 374 
Boise Valley, Columbia River Basin, Idaho (NPW) 1190, 1189, 
1191 
Bolles Harbor, Mich. (NCE) 899, 922, 928 
Bon Secour River, Ala. (SAM) 374 
Bonnes Coulee, Velva, N. Dak. (NCS) 823 
Bonnet Carre Spillway, La. (MR&T) 1224 
Bonneville Lake, Ky. (ORL) 699, 702, 718, 729 
Bonneville Lock & Dam, Oreg. & Wash. (Lake Bonneville) (NPP) 
1116, 1127, 1132, 1143 
Bonpas Creek, Ill. (Wabash River Basin) (ORL) 726 
Bonum Creek, Va. (NAB) 155, 180 
Boothbay Harbor, Maine (NED) 68 
Boston Harbor, Mass. (NED) 2, 47, 67 
Boswell Lake, Okla. (SWT) 603, 605 
Boulder, Colo. (MRO) 662 
Bowman-Haley Lake, N. Dak. (MRO) 642, 653 
Brackenridge, Tarentum, and Natrona, Pa. (ORP) 795, 798 
Bradford, Pa. (ORP) 797, 798 
Bradley Lake, Alaska (NAP) 1207, 1209, 1211 
Branford Harbor, Conn. (NED) 68 
Branson Cove, Lower Machodoc River, Va. (NAB) 192 
Brant Rock Beach, Marshfield, Mass. (NED) 72 
Braymer Lake, Shoal Creek, Mo. (MRK) 638 
Brazil (Big Walnut Creek) Ind. (ORL) 730 
Brazos Island Harbor, Tex. (SWG) 464, 477, 481, 493, 495, 501 
Brazos River and tributaries, Tex. (SWF) 527, 528 
Brazos River Basin, Texas (SWF) 510 
Brazos River, Tex. from Velasco to Old Washington (SWG) 491 
Brea Reservoir, Calif. (SPL) 1021 
Breton Bay, Md. (NAB) 192 
Brevard County, F a. (SAJ) 322 
Brevoort levee, W bash River, Ind. (ORL) 732, 730 
Bridgeport Harbor, Conn. (NED) 68 
Brilliant, Ohio (ORP) 795, 798 
Bristol Harbor, R. I. (NED) 68 
Broad Creek, Beaufort County, N. C. (SAW) 233, 248 
Broad Creek, Md. (NAB) 192 
Broad Creek, Va. (NAO) 223 
Broadkill Beach, Sussex County, Del. (NAP) 151 
Broadkill River, Del. (NAP) 150 
Broadwater Creek, Md. (NAB) 192 
Brockway, Pa. (ORP) 795, 798 
Brockway Reservoir, Vt. (NED) 74, 78 
Broken Bow Lake, Red River Basin, Okla. (SWT) 587, 595, 597, 
602, 603 
Bromley, Ohio River Basin, Ky. (ORL) 732, 726 
Bronx River, N. Y. (NAN) 124 
Brookfield Lake, Yellow Creek, Mo. (MRK) 609, 626, 638 
Brooklyn, W. Va. (ORH) 762, 756 
Brookport, Ill. (ORL) 732, 726, 730 
Brookville Lake, Ind. (ORL) 699, 702, 718, 729 
Brookville, Pa. (ORP) 798 
Broward County, Fla., Beach Erosion Control and Hillsboro Inlet, 
Fla., Navigation project (SAJ) 322 
Brown, Clarence J., Dam and Lake, Ohio (ORL) 699, 718, 704 
Browns Creek, N. Y. (NAN) 124 
Brownwood Channel Improvement, Texas (SWF) 530 
Brunswick County Beaches, N. C. (SAW) 234, 248 
Brunswick Harbor, Ga. (SAS) 277, 282 
Buchanan Reservoir, Chowchilla River, Calif. (SPK) 1056, 1074 
Buck Creek, N. C. and S. C. (SAN) 264, 268 
Buckhannon River, W. Va. (ORP) 794 
Buckhannon, W. Va. (ORP) 770, 786, 797, 798 
Buckhorn Lake, Ky. (ORL) 699, 702, 718, 729 
Buckhorn Reservoir, N. C. (SAW) 255 
Bucksport Harbor, Maine (NED) 68 
Buena Vista, Ohio (ORH) 762, 756 
Buffalo Bayou and Tributaries, Tex. (SWG) 473, 478, 490, 503 
Buffalo Creek, Scranton, N. Dak. (MRO) 662 
Buffalo Harbor, N. Y. (NCB) 945,963, 968 
Buffumville Lake, Mass. (NED) 42, 55, 77 
See page 1297 for District abbreviations. 1300

INDEX 
Buford Dam and Reservoir, Ga. (SAM) 352, 361 
Bull Shoals Lake, Ark. (SWL) 551, 558, 562, 570 
Bullocks Point Cove, R.I. (NED) 68 
Bunker Harbor, Maine (NED) 68 
Burch Creek, Weber County, Utah (SPK) 1083 
Burgettstown, Pa. (ORP) 798 
Burial Hill Beach, Westport, Conn. (NED) 72 
Burlington Harbor, Vt. (NAN) 124 
Burlington, Ohio (ORH) 762, 756 
Burns Waterway Harbor, Ind. (NCC) 853, 873 
Burnsville Lake, Ohio River Basin, W. Va. (ORH) 737, 751, 758 
Butler, Pa. (ORP) 797, 798 
Buttermilk Bay Channel, Mass. (NED) 68 
Buttermilk Channel, N. Y. (NAN) 82, 112 
Byram River at Pemberwick, Conn. (NAN) 126 
C 
Cache River Diversion, Illinois (LMS) 461 
Caddo Lake, La. (LMN) 399, 409, 422 
Cadet Bayou, Miss. (SAM) 336, 357 
Cadle Creek, Md. (NAB) 192 
Caesar Creek Lake, Ohio (ORL) 699, 703, 718, 729 
Cagles Mill Lake, Ind. (ORL) 699, 703, 718, 729 
Cahaba River, Ala. (SAM) 374 
Calapooia River, Oreg. (NPP) 1141 
Calaveras River and Littlejohn Creek and Tributaries including 
New Hogan and Farmington Reservoirs, Calif. (SPK) 1056, 1074 
Calcasieu Pass channel in Old River Bend at Cameron, La. (LMN) 
421 
Calcasieu River and Pass, La. (LMN) 386, 407, 419 
Calcasieu River Salt-Water Barrier, La. (LMN) 387, 408 
Caledonia, Genesse River, N. Y. (NCB) 977 
Calf Pasture Beach Park, Norwalk, Conn. (NED) 72 
California Branch, S. C. (SAN) 265, 268 
California (Cincinnati) Ohio River Basin, Ohio (ORL) 732, 726 
California Debris Commission 1265 
Calion, Ark. (LMK) 436 
Calispell Creek, Wash. (NPS) 1171 
Calumet Harbor and River, Ill. and Ind. (NCC) 854, 873, 877, 885 
Camanche Reservoir, Calif. (SPK) 1057, 1074 
Camas Creek, Idaho (NPW) 1190 
Cambridge Harbor, Md. (NAB) 156, 180 
Cambridgeport Reservoir, Vt. (NED) 74, 78 
Camden Harbor, Maine (NED) 68 
Campbells Island, Mississippi River, Ill. (NCR) 839 
Campti-Clarence area in Natchitoches Parish, La. (LMN) 422, 424 
Canapitsit Channel, Mass. (NED) 68 
Canaveral Harbor, Fla. (SAJ) 288, 307, 318 
Candy Lake, Verdigris River Basin, Okla (SWT) 577, 592, 597 
Cane River, La. (LMN) 421 
Caney Fork River, Tenn. (ORN) 695 
Canisteo, N. Y. (NAB) 172, 196 
Cannelton, Ohio River Basin, Ind. (ORL) 732, 726, 730 
Canton Lake, Arkansas River Basin, Okla. (SWT) 567, 577, 592, 
600, 602 
Canton, Mass. (NED) 78 
Canton, Mo. (NCR) 839 
Canyon Lake, Tex. (SWF) 511,522 
Cape Charles City Harbor, Va. (NAO) 223 
Cape Cod Canal, Mass. (NED) 3, 47 
Cape Fear River Basin, N. C. (SAW) 234, 255 
Cape Fear River, N.C. above Wilmington (SAW) 22, 247 
Cape Florida State Park. Fla. (SAJ) 322 
Cape Girardeau, Mo. No. 2 (LMS) 461 
Cape Girardeau, Mo., reaches No. 1, 3 and 4 (LMS) 461 
Cape Henry Channel, Va. (NAO) 203 
Cape Lookout, N. C. (SAW) 253 
Cape May City, N. J. (NAP) 151 
Cape Porpoise Harbor, Maine (NED) 68 
Cape Vincent, N. Y. (NCB) 976 
Carden's Bottom Drainage District No. 2, Arkansas River, Ark. 
(SWL) 571 
Carlyle Reservoir, Ill. (LMS) 456, 459 
Carolina Beach and Vicinity, N. C. (SAW) 236, 249 
Carr Fork Lake, Ky. (ORL) 699, 704, 718 
Carrabelle Bar and Harbor, Fla. (SAM) 374 
Carroll County Levee and Drainage District, No. 1, Illinois (NCR) 
839 
Carrollton, Ohio River Basin, Ky. (ORL) 732, 726 
Carters Creek, Va. (NAO) 223 
Carters Dam and Reservoir, Ga. (SAM) 350, 360 
Carthage Levee, Mo. (SWT) 603, 605 
Carthage, Tenn. (ORN) 697 
Carver, Minn., Minnesota River (NCS) 823 
Carvers Harbor, Vinalhaven, Maine (NED) 68 
Cascadia Lake, Oreg. (NPP) 1109, 1125, 1137 
Caseville, Mich. (NCE) 939, 940 
Caseyville, Ohio River Basin, Ky. (ORL) 732, 726 
Cashie River, N. C. (SAW) 254 
Cassville Harbor, Wis. (NCD) 849 
Castle Rock, Cowlitz River, Wash. (NPP) 1141 
Castlewood Dam and Lake, Cherry Creek and Tributaries, Colo. 
(MRO) 662 
Cathance River, Maine (NED) 68 
Catherine Creek Lake, Ore. (NPW) 1176, 1187 
Catlettsburg, Ky. (ORH) 762, 756 
Cattaraugus Harbor, N. Y. (NCB) 976 
Cave-in-Rock, Ohio River Basin, Ill. (ORL) 732, 726 
Cave Run Lake, Ky. (ORL) 699, 704, 718, 729 
Cedar Bayou, Tex. (SWG) 464, 477, 481, 493, 495, 501 
Cedar Keys Harbor, Fla. (SAJ) 320 
Cedar Point Lake, Kans. (SWT) 605 
Cedar River Harbor, Mich. (NCC) 855, 873, 877 
Celina Dam, Ky. (ORN) 697 
Celina, Tenn. (ORN) 697 
Center Hill Lake, Ohio River Basin, Tenn. (ORN) 684, 688, 696 
Central and Southern Florida (SAJ) 302, 309, 323, 324, 325, 326, 
329 
Central City Lake, Upper Mississippi River Basin, Iowa (NCR) 
827, 833, 836 
Ceredo-Kenove, W. Va. (ORH) 762, 756 
Chambersburg, Ohio (ORL) 762, 756 
Channel between North and South Hero Island, Lake Champlain, 
Vt. (NAN) 124 
Channel connecting Plain Dealing Creek and Oak Creek, Md. 
(NAB) 192 
Channel connecting Throughfare Bay with Cedar Bay, N. C. 
(SAW) 254 
Channel connecting York River, Va. with Back Creek to Slaights 
Wharf (NAO) 223 
Channel from Naples to Big Marco Pass: 12-foot phannel, Gordon 
Pass to Naples, Fla. (SAJ) 289, 307 
Channel from Pamilco Sound to Rodanthe, N. C. (SAW) 254 
Channel from Phoebus, Va. to deep water in Hampton Roads 
(NAO) 223 
Channel Islands Harbor, Calif. (SPL) 986, 1006 
Channel to Liberty, Tex. (SWG) 471 
Channel to Newport News, Va. (NAO) 204 
Channel to Port Boliver, Tex. (SWG) 491 
Channels in the Straits of Machinac, Mich. (NCE) 939, 940 
See page 1297 for District abbreviations. 1301

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Chariton-Little Chariton Basins, Mo. (1965 Act) (NRK) 609, 626 
Chariton River, Mo. (1944 Act) (MRK) 610, 626, 637 
Charles River Locks & Dam, Mass. (NED) 23, 51 
Charleston Harbor, S. C. (SAN) 267 
Charlevoix Harbor, Mich. (NCE) 900, 922, 928 
Charlotte Harbor, Fla. (SAJ) 289, 307 
Chartiers Creek, Pa. (ORP) 770, 786, 797 
Chatfield Lake, Colo. (MRO) 642, 653 
Chatham (Stage) Harbor, Mass. (NED) 4, 47 
Chattanooga, Tenn. and Rossville, Ga. (ORN) 696 
Chattoga units (4), Ga. and S. C. (SAS) 284 
Cheat River, W. Va. (ORP) 794 
Cheatham lock and dam, Tenn. (ORN) 697 
Cheboygan Harbor, Mich. (NCE) 939, 940 
Cheesequake Creek, N. J. (NAN) 124 
Chefuncte River and Begue Falia, La. (LMN) 421 
Chehalis River, Wash., City of Chehalis Raw Water Pumphouse, 
right bank (NPS) 1172 
Chena River Lakes, Alaska (NAP) 1205, 1209, 1211 
Cheney Dam and Lake, North Fork of Ninnescah River, Okla. 
(SWT) 604 
Cherokee, Iowa (MRO) 663 
Cherry and Red Fork Creeks, Okla. (SWT) 577, 592, 603 
Cherry Creek Dam and Lake, Colo. (MRO) 642, 653, 656 
Cherry Creek near Duvall, Wash. (NPS) 1172 
Cherryfield, Maine (NED) 78 
Chesapeake, Ohio (ORH) 762, 756 
Chesconessex Creek, Va. (NAO) 223 
Cheshire, Ohio (ORH) 762, 756 
Chester, Calif. (SPK) 1058 
Chester River, Md. (NAB) 156, 180 
Chester River, Pa. (NAP) 150 
Chetco River, Oreg. (NPP) 1096, 1123 
Chicago Harbor, Ill. (NCC) 856, 873, 877, 885 
Chicago River, Ill. (NCC) 856, 873, 878 
Chicopee Falls, Mass. (NED) 26, 52, 74 
Chicopee, Mass. (NED) 74, 78 
Chief Joseph Dam, Columbia River, Wash. (NPS) 1157, 1162, 1166 
Chillicothe, Ohio (ORH) 762 
Chilo, Ohio (ORH) 762, 756 
Chincoteague Bay, Va. (NAO) 223 
Chincoteague, Va. Harbor of Refuge (NAO) 223 
Chino Canyon Improvements, Palm Springs, Calif. (SPL) 1004 
Chippewa Harbor, Isle Royale, Mich. (NCS) 821 
Chittenango Creek and tributaries, N. Y. (NCB) 977 
Choctaw Bayou and tributaries, La. (LMN) 424 
Choptank River, Md. (NAB) 157, 180 
Chotawhatchee River, Fla. and Ala. (SAM) 374 
Chouteau Lock and Dam (No. 17), Okla. (SWT) 575, 600 
Chouteau, Nameoki, and Venice Drainage and Levee District 
(LMS) 461 
Chowan River, N. C. (NAO) 223, 254 
Christiansted Harbor, St. Croix, V. I. (SAJ) 320 
Cincinnati, Ohio River Basin, Ohio (ORL) 732, 726, 730 
Cincinnati (unit 2) Ohio River Basin, Ohio (ORL) 732, 726 
Cincinnati (unit 4 remainder) Ohio River Basin, Ohio (ORL) 732, 
726 
City Creek Levee, San Bernardino County, Calif. (SPL) 1022 
City of Aurora, Westerly Creek, Colo. (MRO) 662 
Clackamas River at Dixon Farm location, Oreg. (NPP) 1141 
Claiborne Harbor, Md. (NAB) 192 
Claiborne lock and dam, Ala. (SAM) 350, 360 
Clanton, Ala. (SAM) 375 
Claremont Reservoir, N.H. (NED) 74, 78 
Clarence Cannon Dam and Reservoir, Salt River, Mo. (LMS) 457 
Clarence J. Brown Dam & Reservoir, Ohio (ORL) 699, 704, 718 
Clarendon to Laconia Circle, White River Basin, Ark. (LMM) 444 
Clarington, Ohio (ORH) 762, 756, 795, 798 
Clark Fort at Missoula, Mont. (NPS) 1171 
Clark Hill Dam and Reservoir, Ga. and S. C. (SAS) 280, 282, 284 
Clark Point, New Bedford, Mass. (NED) 72 
Clarkesville, Tenn. (ORN) 697 
Clarkson, Nebr., Maple Creek (MRO) 662 
Clarksville, Ark. (SWL) 571 
Clatskanie Drainage District, Oreg. (NPP) 1138, 1140 
Clatskanie River, Oreg. (NPP) 1134, 1140 
Clatsop County Diking District 6, Oreg. (NPP) 1138, 1140 
Clatsop County Diking District 4, Oreg. (NPP) 1138, 1140 
Clatsop County Diking District 2, Oreg. (NPP) 1139 
Clatsop County Diking District 3, Oreg. (NPP) 1139 
Clatsop County Diking District 5, Oreg. (NPP) 1139 
Clatsop County Drainage District 1, Oreg. (NPP) 1138, 1139, 1140 
Clayton Lake, Okla. (SWT) 577, 592, 597, 603 
Clear Creek & Clear Lake, Tex. (SWG) 465, 477, 481, 492, 495 
Clear Creek Drainage and Levee District, Ill. (LMS) 461 
Clear Creek, Pierce City, Mo. (SWT) 604 
Clearwater Lake, Mo. (SWL) 551, 554, 561, 570 
Clearwater Pass, Fla. (SAJ) 289, 307 
Clearwater River, Wash., Jefferson County Road, left bank (NPS) 
1172 
Clendenin, W. Va. (ORH) 760 
Cleveland and Lakewood Ohio: Edgewater Park White City Park 
(NCB) 977 
Cleveland Harbor, Ohio (NCB) 946, 963, 969 
Cleves, Ohio River Basin, Ohio (ORL) 732, 726 
Cliff Walk, Newport, R.I. (NED) 21, 51 
Clifton, W. Va. (ORH) 762, 756 
Clifty Creek Lake, Ind. (ORL) 699, 704, 719 
Clinch River, Tenn. and Va. (ORN) 695 
Clinton Harbor, Conn. (NED) 68 
Clinton Harbor, Iowa (NCD) 849 
Clinton, Iowa (NCR) 827, 833, 836 
Clinton Lake, Wakarusa River, Kans. (MRK) 610, 626 
Clinton, Ohio River Basin, Ind. (Wabash River) (ORL) 732, 726 
Clinton River, Mich. (NCE) 900, 922, 928 
Cloveport, Ohio River Basin, Ky. (ORL) 732, 726 
Clyde, Kans. (MRK) 637 
Clyde, R.I. (NED) 78 
Coal Creek and tributaries (Lake City), Tenn. (ORN) 696 
Coal Grove, Ohio (ORH) 762, 756, 760 
Coan River, Va. (NAB) 192 
Coast of California, Point Mugu to San Pedro breakwater, Calif. 
(SPL) 993, 1007 
Coastal Engineering Research Center (CERC) 1263 
Coasters Island Harbor, R.I. (NED) 68 
Cobscook Bay, Maine (NED) 68 
Cochiti Lake, N. Mex. (SWA) 540, 544, 547, 550 
Cockrells Creek, Va. (NAO) 223 
Coeur d'Alene, Spokane River, Idaho (NPS) 1171 
Coffeyville Levee, Kans. (SWT) 603 
Cohansey River, N.J. (NAP) 131, 143 
Cohasset Harbor, Mass. (NED) 5, 47 
Coheco River, N. H. (NED) 68, 78 
Cold Spring Inlet, N.J. (NAP) 150 
Colebrook River Lake, Conn. (NED) 26, 52, 74 
Colfax, Grant Parish, La. (LMN) 423, 424 
Colfax, Palouse River, Wash. (NPW) 1191 
Collinsville, Ala. (SAM) 375 
Colonial Beach Shore Protection, Va. (NAB) 192 
Colorado River, Matagorda, Tex. (SWG) 492 
See page 1297 for District abbreviations. 1302

INDEX 
Colorado Springs, Fountaine que Bouille River, Colo. (Templeton 
Gap Floodway) (SWA) 549 
Columbia and Lower Williamette Rivers below Vancouver, Wash., 
and Portland, Oreg. (NPP) 1096, 1123, 1133, 1129 
Columbia Drainage and Levee District No. 3, Ill. (LMS) 461 
Columbia Drainage District 1, Oreg. (NPP) 1138, 1140 
Columbia, La. (LMK) 436 
Columbia lock and dam, Ala., and Ga. (SAM) 352, 361 
Columbia River and Tributaries above Celilo Falls to Kennewick, 
Wash. (NPW) 1189 
Columbia River at Baker Bay, Wash. (NPP) 1098, 1123, 1129 
Columbia River at the Mouth, Ore. and Wash. (NPP) 1098, 1123, 
1129 
Columbia River Basin, Local Protection Projects (NPP) (NPS) 
(NPW) 1153, 1161, 1166, 1171, 1177, 1187 
Columbia River Basin, Oreg. (NPP) 1139, 1142 
Columbia River Between Chinnook, Wash. and head of Sand 
Island (NPP) 1099, 1123, 1130 
Columbia River between Vancouver, Wash., and The Dalles, Oreg. 
(NPP) 1099, 1123, 1130 
Columbia River Treaty Entities 1293 
Columbia River Treaty Permanent Engineering Board 1293 
Columbia River, Wenatchee to Kettle Falls, Wash. (NPS) 1170 
Columbia Slough, Oreg. (NPP) 1134 
Columbus, Ohio (ORH) 762, 760 
Compo Beach, Westport, Conn. (NED) 72 
Conant Brook Dam, Mass. (NED) 26, 52, 74 
Conchas Lake, Candian River, N. Mex. (SWA) 534, 544, 546 
Concordia, Ohio River Basin, Ky. (ORL) 732, 726 
Conemaugh River Lake, Ohio River Basin, Pa. (ORP) 771, 786 
Conetoe Creek, N. C. (SAW) 256 
Coney Island Channel, N. Y. (NAN) 124 
Coney Island Creek, N. Y. (NAN) 124 
Congaree River, S. C. (SAN) 272 
Conneaut Harbor, Ohio (NCB) 948, 963, 970 
Connecticut River (above Hartford), Conn. (NED) 23, 74 
Connecticut River Basin, Vt., N.H., Mass. and Conn. (NED) 23, 74 
Connecticut River Below Hartford, Conn. (NED) 5, 47 
Connell, Wash. (NPW) 1191 
Conoho Creek, N. C. (SAW) 236, 249 
Contentnea Creek, N. C. (SAW) 254, 256 
Conway County Drainage and Levee District No. 1, Arkansas 
River, Ark. (SWL) 571 
Conway County Levee District No. 6, Arkansas River, Ark. (SWL) 
571 
Conway County Levee Districts Nos. 1, 2, and 8, Arkansas River, 
Ark. (SWL) 571 
Cooper Lake and Channels, Tex. (LMN) 399, 409, 422 
Cooper River, Charleston Harbor, S. C. (SAN) 261, 267 
Cooper River, N. J. (NAP) 150 
Coordinating Committee on Great Lakes Basic Hydraulic & 
Hydrologic Data 1287 
Coos and Millicoma Rivers, Oreg. (NPP) 1101, 1123 
Coos Bay, Oreg. (NPP) 1100, 1123, 1130 
Coos River, Catching Inlet Drainage District, Oreg. (NPP) 1141 
Copan Lake, Verdigris River Basin, Okla. (SWT) 578, 592, 597 
Copes Corner Reservoir, N. Y. (NAB) 170, 194, 196 
Coquille River, Oreg. (NPP) 1101, 1124, 1130, 1141 
Coralville Lake, Upper Mississippi River Basin, Iowa (NCR) 827, 
833, 836 
Coraopolis, Pa. (ORP) 795, 798 
Corbin (Lynn Camp Creek), Ky. (ORN) 696 
Cordell Hull lock and darn, Tenn. (ORN) 697 
Cordova Harbor, Alaska (NPA) 1200, 1208, 1210 
Core Creek, N. C. (SAW) 256 
Corea Harbor, Maine (NED) 68 
Corning, N. Y. (NAB) 171, 195, 196 
Cornucopia Harbor, Wis. (NCS) 802, 814, 817 
Corpus Christi, Tex., Channel (SWG) 465, 477, 491, 481, 493, 495, 
501 
Corsica River, Md. (NAB) 192 
Corte Madera Creek, Calif. (SPN) 1034, 1041, 1045 
Cortland, N. Y. (NAB) 174 
Cottage Grove Lake, Oreg. (NPP) 1110, 1125, 1136, 1137 
Cottonwood Creek Dam, Boise, Idaho (NPW) 1177, 1187 
Cottonwood Slough pumping plant, Illinois (LMM) 444 
Cotuit Harbor, Mass. (NED) 68 
Cougar Lake, Oreg. (NPP) 1117, 1127, 1136, 1137 
Council Bluffs, Iowa (MRO) 659, 662 
Council Grove Lake, Grand (Neosho) kiver Basin, Kans. (SWT) 
578, 593, 602 
Courtableau Basin, La. and Outlets (MR&T) 1230 
Courtenay Channel, Fla. (SAJ) 320 
Cove Island, Stamford, Conn. (NED) 72 
Covington, Ohio River Basin, Ky. (ORL) 732, 726, 730 
Cow Creek, Kan. (SWT) 578, 593, 597 
Cowanesque Lake, N. Y. (NAB) 174 
Cowlitz County Consolidated Diking Improvement District 2, 
Wash. (NPP) 1110, 1126, 1138 
Cowlitz County Consolidated Diking & Improvement District 1, 
Wash. (NPP) 1138, 1139, 1140 
Cowlitz County Diking & Improvement District 2, Wash. (NPP) 
1138, 1140 
Cowlitz County Diking & Improvement District 5, Wash. (NPP) 
1139 
Cowlitz County Diking & Improvement District 13, Wash. (NPP) 
1138, 1140 
Cowlitz County Diking & Improvement District 11, Wash. (NPP) 
1140 
Cowlitz County Diking & Improvement District 15, Wash. (NPP) 
1138, 1140 
Cowlitz River Basin, Wash. (NPP) 1140 
Cowlitz River, Wash. (NPP) 1102, 1124 
Coyote Creek, Calif. (SPN) 1049 
Coyote & Spencer Creeks, Long Tom River, Oreg. (NPP) 1141 
Crab and Wilson Creeks, Wash. (NPS) 1171 
Craig Harbor, Alaska (NPA) 1212 
Cranes Creek, Va. (NAO) 223 
Crawford County Levee District, Arkansas River, Ark. (SWL) 571 
Creede, Willow Creek, Colo. (floodway) (SWA) 549 
Crescent City Harbor, Calif. (SPN) 1025, 1040, 1043 
Criehaven Harbor, Maine (NED) 68 
Crisfield Harbor, Md. (NAB) 192 
Crooked Creek and Tributaries at end in vicinity of Harrison, Ark. 
(SWL) 572 
Crooked Creek Lake, Ohio River Basin, Pa. (ORP) 571, 772, 786 
Cross-Florida Barge Canal (SAJ) 290, 307, 318 
Cross Rip Shoals, Nantucket Sound, Mass. (NED) 68 
Cross Village, Mich (NCE) 940 
Crutcho Creek, Okla. (SWT) 579, 593, 597 
Crystal River, Fla. (SAJ) 320 
Cucamonga Creek, Santa Ana River Basin, Calif. (SPL) 1022 
Cuckhold Creek, Md. (NAB) 157, 180 
Cuivre River, Mo. (LMS) 460 
Cumberland, Ky. (ORN) 682, 688 
Cumberland, Md., and Ridgeley, W. Va. (NAB) 168, 183 
Cumberland River above Nashville (ORN) 690 
Cumberland River below Nashville (ORN) 690 
Cumberland River, Tenn. and Ky. (ORN) 677, 688, 692, 693 
Cummings Park, Stamford, Conn. (NED) 72 
See page 1297 for District abbreviations. 1303

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Cunninghill Cove, Md. (NAB) 157 
Current River, Ark. and Mo. (SWL) 569 
Cuttyhunk Harbor, Mass. (NED) 68 
Cypress Bayou and Waterway between Jefferson, Tex. and 
Shreveport, La. (LMN) 421 
Cypress Creek, Ky. (ORL) 730 
Cypress Creek, Md. (NAB) 192 
D 
Dade County, Fla. (SAJ) 322 
Dale Hollow Lake, Ohio River Basin, Tenn. and Ky. (ORN) 685, 
688, 696 
Dallas Floodway, Tex. (SWF) 531 
Dallas Local Flood Protection, Tex. (SWF) 529 
Dam A Lake, Neches River, Texas (SWF) 525 
Damariscotta River, Maine (NED) 68 
Dana Point Harbor, Calif. (SPL) 986, 1006 
Danbury, Conn. (NED) 34, 54, 75 
Dansville and vicinity, Genesee River, N. Y. (NCB) 977 
Dardanelle lock and dam (No. 10) Ark. (SWL) 551, 558, 562, 565 
Darien Harbor, Ga. (SAS) 284 
Dauphin Island Bay, Ala. (SAM) 336, 357 
Davenport Center Reservoir, N. Y. (NAB) 169, 194, 196 
Davenport Harbor, Iowa (Credit Island) (NCD) 849 
Davenport Harbor, Iowa (Lindsay Park) (NCD) 849 
David D. Terry lock & dam (No. 6), Ark. (SWL) 551, 552, 565 
Davids Creek Dam and Lake, Iowa (MRO) 643, 653 
Davis Creek, Va. (NAO) 223 
Dayton, Ohio River Basin, Ky. (ORL) 699, 705, 719, 726 
Dayton, Touchet River, Wash. (NPW) 1191 
Dayton, Wyo. (MRO) 662 
Deep Creek, Accomack County, Va. (NAO) 223 
Deep Creek, Newport News, Va. (NAO) 223 
Deep Fork Creek, Okla. City, Okla. (SWT) 604 
Deep River, Wash. (NPP) 1134, 1139 
Deer Creek Lake, Ohio River Basin, W. Va. (ORH) 738, 751, 758 
Deer Creek Prairie levee, Indiana (Wabash River) (ORL) 732, 726 
Deer Island area, Columbia County, Oreg. (NPP) 1139 
Deer Island Drainage District, Oreg. (NPP) 1138, 1140 
Deer Island Thoroughfare, Maine (NED) 68 
Deer Trail, Colo. (MRO) 663 
Deer Trail, Colo. (MRO) 663 
Degognia and Fountain Bluff Levee and Drainage District, Ill. 
(LMS) 461 
DeGray Reservoir, Caddo River, Ark. (LMK) 429, 432, 436 
Delano, Minn. (NCS) 824 
Delaware Coast Protection, Del. (NAP) 152 
Delaware Lake, Ohio River Basin, Ohio (ORL) 738, 751, 758 
Delaware River at Camden, N. J. (NAP) 150 
Delaware River Between Philadelphia, Pa., & Trenton, N. J. 
(NAP) 131, 143, 148 
Delaware River, N. Y., N. J., and Pa. at or near mouth of Neversink 
River (NAP) 150 
Delaware River, Pa., N. J., & Del., Philadelphia to the Sea (NAP) 
132, 143, 148 
Delphi, Ohio River Basin, Ind. (Wabash River) (ORL) 732, 726, 
730 
Denison Dam (Lake Texoma), Red River, Tex. and Okla. (SWT) 
587, 595, 602, 606 
Dennis Creek, N.J. (NAP) 150 
Depoe Bay, Oreg. (NPP) 1102, 1124, 1130 
DeQueen Lake, Red River Basin, Ark. (SWT) 579, 593, 597, 603 
Derby, Conn. (NED) 34, 75 
Derby, Ohio River Basin, Ind. (ORL) 732, 726 
Des Moines and Mississippi Levee District No. 1, Mo. (NCR) 839 
Des Moines, Iowa (NCR) 827, 833, 836 
DeSoto Bridge Protection (MRK) 637 
Detroit Lake, Oreg. (NPP) 1117, 1127, 1136, 1137 
Detroit River, Mich. (NCE) 901,922, 928, 937 
Dewey Lake, Ohio River Basin, Ky. (ORH) 739, 751, 758 
Dickey-Lincoln School Reservoirs, Me. (NED) 78 
Dickinson Bayou, Tex. (SWG) 491 
Dierks Lake, Red River Basin, Ark. (SWT) 579, 593, 597, 603 
Dillingham Harbor, Alaska (NPA) 1200, 1208, 1210 
Dillon Lake, Ohio River Basin, Ohio (ORH) 739, 751, 758 
Dillonvale, Ohio (ORP) 795, 798 
Dively Drainage and Levee District No. 23, Ill. (LMS) 456, 459 
Dodge City local protection project, Kansas (SWA) 534, 544, 546 
Dodge, Nebr. (MRO) 663 
Dog and Fowl Rivers, Ala. (SAM) 337, 357 
Doheny Beach State Park, Calif. (SPL) 1014 
Dorchester Bay and Neponset River, Mass. (NED) 68 
Dorena Lake, Oreg. (NPP) 1110, 1126, 1136, 1137 
Double Bayou, Tex. (SWG) 466, 477, 483, 496 
Double Creek, N. J. (NAP) 150 
Douglas Harbor, Alaska (NPA) 1212 
Douglass Lake, Kans. (SWT) 605 
Dover, Ky. (ORH) 762, 756 
Downeyville Dam and Reservoir, Ind. (ORL) 729 
Drum Inlet, N. C. (SAW) 228, 247 
Drury Drainage District, Ill. (NCR) 839 
Dry Creek, Hawarden, Iowa (MRO) 662 
Dry Fork and East Fork Lake, Fishing River, Mo. (MRK) 638 
Dry Pass, Alaska (NPA) 1212 
Dry Run, Iowa (NCS) 823 
DuBois, Pa. (ORP) 772, 786 
Dubuque Harbor, Iowa (NCD) 849 
Dubuque, Iowa (NCR) 828, 833, 836 
Duck Creek Channel Improvement, Texas (SWF) 511,522 
Duck Creek, San Joaquin County, Calif. (SPK) 1083 
Duck Island Harbor, Conn. (NED) 68 
Duck Point Cove (Hearns Creek), Md. (NAB) 192 
Duck River, Tenn. (ORN) 695 
Duluth Superior Harbor, Minn. and Wis. (NCS) 802, 814, 817 
Dungeness River, Clallam County, Wash. (NPS) 1171 
Dunkirk Harbor, N. Y. (NCB) 949, 963, 970 
Duval County, Fla. (SAJ) 322 
Duxbury Harbor, Mass. (NED) 68 
Dworshak Reservoir and Dam, North Fork Clearwater River, 
Idaho (NPW) 1180, 1187, 1193 
Dyersburg, Tenn. (LMM) 444 
Dymers Creek, Va. (NAO) 223 
E 
Eagle Creek Lake, Ky. (ORL) 699, 705, 719 
Eagle Creek Lake, Ohio (ORP) 798 
Eagle Harbor, Mich. (NCS) 820, 821 
East Barre Reservoir, Winooski River, Vt. (NAN) 126 
East Bay Bayou (Hanna Reef), Tex. (SWG) 491 
East Boothbay Harbor, Maine (NED) 68 
East Branch, Clarion River Lake, Ohio River Basin, Pa. (ORP) 
773, 787 
East Branch Dam, Conn. (NED) 34, 54, 75 
East Branch, Delaware River, N. Y. (NAP) 152 
East Brimfield Lake, Mass. (NED) 42, 55, 77 
East Cape Girardeau and Clear Creek Drainage District, Ill. 
(LMS) 461 
East Chester Creek, N.Y. (NAN) 83, 112 
East Fork Lake, Ohio (ORL) 699, 705, 719, 729 
East Hartford, Conn. (NED) 75, 78 
See page 1297 for District abbreviations. 1304

INDEX 
East Lynn Lake, Ohio River Basin, W. Va. (ORL) 740, 751, 758 
East Moline, Ill. (NCR) 839 
East Muddy Creek, Mo. (MRK) 638 
East Muddy & Lake Creek, Oreg. (NPP) 1141 
East Nishnabotna River, Red Oak, Iowa (MRO) 662 
East Pass Channel Gulf of Mexico into Choctawatchee Bay, Fla. 
(SAM) 337, 358 
East Pearl River, Miss. (SAM) 337 
East Point, La. (LMN) 422, 424 
East Poplar Bluff and Poplar Bluff, Mo. (SWL) 571 
East protection levee (Morganza & Atchafalaya Floodways) 
(MR&T) 1229 
East Rainelle, W. Va. (ORH) 762 
East River, N. Y. (NAN) 124 
East Rockaway Inlet, N.Y. (NAN) 83, 112 
East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, N.Y. 
(NAN) 98, 114 
East Sidney Reservoir, N. Y. (NAB) 169, 194, 196 
East St. Louis and vicinity, Ill. (LMS) 456 
East Weaver Creek, Calif. (SPN) 1049 
Eastlake, Ohio, Chagrin River (NCB) 958, 965 
Eastport Harbor, Maine (NED) 68 
Eau Claire, Wis., Chippewa River (NCS) 823 
Eau Claire, Wis. (NCS) 824 
Eau Galle River, Wis. (NCS) 807, 815 
Eau Gallie Harbor, Fla. (SAJ) 291, 307 
Echo Bay Harbor, N. Y. (NAN) 124 
Edenton Harbor, N. C. (SAW) 254 
Edgartown Harbor, Mass. (NED) 68 
Edisto River, S. C. (SAN) 272, 274 
Edmonds Harbor, Wash. (NPS) 1169, 1170 
Edward MacDowell Dam, N.H. (NED) 38, 54, 76 
Eel River, Calif. (SPN) 1035, 1041, 1046 
Eel River, Ind. (ORL) 730 
Egegik, Alaska (NPA) 1201, 1208, 1210 
El Dorado, Kans. (SWT) 605 
El Dorado Lake, Arkansas River Basin, Kan. (SWT) 579, 593, 597 
El Paso local protection project, Texas (SWA) 535, 544, 546 
Elfin Cove, Alaska (NPA) 1212 
Elizabeth, N.J. (NAN) 99, 114 
Elizabeth River, N. J. (NAN) 124 
Elizabethtown, Ohio River.Basin, Ill. (ORL) 732, 726 
Elk and Little Elk Rivers, Md. (NAB) 192 
Elk City Lake, Arkansas River Basin, Kan. (SWT) 567, 580, 593, 
600, 602 
Elk Creek, Clyde, Kans. (MRK) 610, 626, 637, 638 
Elk Creek Lake, Rouge River Basin, Oreg. (NPP) 1111, 1126 
Elk Creek, Pa. (NCB) 976 
Elk River, Ala. and Tenn. (ORN) 695 
Elk River, Minn., Mississippi River (NCS) 823 
Elk River, W. Va. (ORH) 755 
Elkhorn River near King Lake (MRO) 663 
Elkins, W. Va. (ORP) 773, 787, 795 
Elkland, Pa. (NAB) 174, 175 
Elkport, Turkey River, Iowa (NCR) 839 
Ellerbe Creek, Durham County, N.C. (SAW) 
Elm Fork Floodway, Tex. (SWF) 511, 522 
Elmira, N. Y. (NAB) 171, 195, 196 
Elochoman Slough, Wash. (NPP) 1102, 1124, 1134 
Emerson, Iowa - Indian Creek (MRO) 663 
Empire, Ohio (ORP) 795, 798 
Endicott, Johnson City, and Vestal, N. Y. (NAB) 198 
England Pond levee, Ill, (ORL) 699, 705, 719, 726 
English, Ind. (Little Blue River) (ORL) 732, 730 
Enid Diversion Channel and Levee, Okla. (SWT) 603 
Enid, Okla. (SWT) 605 
Enid Reservoir (MR&T) 1225, 1235 
Entiat River, Wash. (NPS) 1171 
Erie Harbor, Pa. (NCB) 949, 963, 971 
Escambia and Conecuh Rivers, Ala. and Fla. (SAM) 338, 358 
Essex River, Mass. (NED) 68 
Eudora Bridge Protection (MRK) 637 
Eufaula Lake, Canadian River, Okla. (SWT) 567, 588, 595, 597, 
600, 602 
Evanston, Ill. (NCC) 869, 876, 884 
Evansville, Ind. (ORL) 699, 706, 719, 726, 730 
Evarts, Ky. (ORN) 683, 688 
Everett Harbor and Snohomish River, Wash. (NPS) 1149, 1160, 
1164 
Everglades Harbor, Fla. (SAJ) 320 
Exeter River, N. H. (NED) 69 
Experimental Water Quality Study Projects, Red River Basin, Tex. 
(SWT) 576, 592 
Fabius River Drainage District, Mo. (NCR) 839 
Fair Haven Beach State Park, Lake Ontario, N. Y. (NCB) 977 
Fairbanks, Alaska (NPA) 1213 
Fairbanks, Tanana River & Chena Slough, Alaska (NPA) 1213 
Fairbury, Little Blue River, Nebr. (MRK) 610, 626, 637 
Fairport Harbor, Ohio (NCB) 950, 964, 971 
Fajardo Harbor, P. R. (SAJ) 320 
Fall Creek Lake, Oreg. (NPP) 1111, 1126, 1136, 1137 
Fall River Basin, S. Dak. (MRO) 643, 653 
Fall River Harbor, Mass. (NED) 6, 47 
Fall River Lake, Arkansas River Basin, Kan. (SWT) 567, 580, 593, 
600, 602 
F 
Falls Lake, N. C. (SAW) 240, 249, 255 
Falmouth Harbor, Mass. (NED) 69 
Falmouth Lake, Ohio River Basin, Ky. (Licking River) (ORL) 699, 
706 719, 729 
Fancy Bluff Creek, Ga. (SAS) 284 
Far Creek, N. C. (SAW) 254 
Farm Creek, Ill. (NCC) 870, 876 
Faulkner County Levee District No. 1, Arkansas River, Ark. (SWL) 
571 
Feather River, Calif. (SPK) 1080 
Ferguson Creek, Long Tom River, Oreg. (NPP) 1141 
Fern Ridge Lake, Oreg. (NPP) 1111, 1126, 1136, 1137 
Fernandina Harbor, Fla. (SAJ) 291, 307 
Filberts Creek, N. C. (SAW) 237, 249 
Fire Island Inlet, Long Island, N. Y. (NAN) 83, 96, 112, 114 
Fire Island Inlet to Montauk Point, N.Y. (NAN) 100, 114 
Fishing Bay, Md. (NAB) 192 
Fishing Creek, Md. (NAB) 192 
Fishing Creek, N. C. (SAW) 254 
Fishtrap Lake, Ohio River Basin, Ky. (ORH) 740, 752, 758 
Fivemile River Harbor, Conn. (NED) 69 
Flannagan, John W. Dam and Lake, Ohio River Basin, Va. (ORH) 
741,752, 758 
Flat Creek, Long Tom River, Oreg. (NPP) 1141 
Flat Rock Creek, Tulsa, Okla. (SWT) 604 
Flathead River, Moat. (NPS) 1170 
Fletcher and Sunshine Gardens levee, Indiana (Wabash River 
Basin) (ORL) 732, 726 
Floodwall Levees, Portland, Oreg. (NPP) 1137, 1141 
Florence Levee, Kans. (SWT) 603, 605 
Floyd River, Sioux City, Iowa (MRO) 644, 653 
Flushing Bay and Creek, N.Y. (NAN) 124 
Fly Creek, Fairhope, Ala. (SAM) 338, 358 
See page 1297 for District abbreviations. 1305

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Follansbee, W. Va. (ORP) 795, 798 
Folsom Reservoir, American River, Calif. (SPK) 1083 
Forest Heights, Md. (NAB) 198 
Forestville Harbor, Mich. (NCE) 940 
Forked Deer River (MR&T) 1227 
Forked Deer River, Tenn., including South Fork (LMM) 443 
Forsyth, Mont. (MRO) 662 
Fort Chartres and Ivy Landing Drainage District No. 5, Ill. (LMS) 
461 
Fort Cobb Dam and Lake, Pond Creek, Okla. (SWT) 604 
Fort Gibson Lake, Arkansas River Basin, Okla. (SWT) 567, 588, 
595, 600, 602 
Fort Leavenworth Bridge removal (MRK) 634 
Fort Macon State Park, N. C. (SAW) 232, 248 
Fort Madison Harbor, Iowa (NCD) 849 
Fort Myers Beach, Fla. (SAJ) 291, 307, 312 
Fort Peck Lake, Mont. (MRO) 639 
Fort Pierce Harbor, Fla. (SAJ) 320, 322 
Fort Randall Dam, Missouri River Basin, S. Dak. (MRO) 651, 655, 
659 
Fort Scott Lake, Marmaton River, Kans. (MRK) 611, 626, 636 
Fort Smith, Arkansas River, Ark. (SWL) 571, 606 
Fort Supply Lake, North Canadian River, Okla. (SWT) 580, 593, 
602 
Fort Worth Floodway (Clear Fork) Tex. (SWF) 512, 522, 529, 531 
Foss Dam and Lake, Washita River, Okla. (SWT) 604 
Foster Joseph Sayers Reservoir, Pa. (NAB) 176 
Four River Basins, Fla. (SAJ) 304, 310, 326, 327 
Fourche Creek and Tributaries (SWL) 572 
Fourche Creek, Little Rock, Ark. (SWL) 551, 555, 561 
Fox Point Barrier, Narragansett Bay, R.I. (NED) 32, 53 
Fox River, Wis. (NCC) 857, 873, 889, 888 
Francis E. Walter Dam, Pa. (NAP) 140, 144 
Frankfort, Black Vermillion River, Kans. (MRK) 638 
Frankfort Harbor, Mich. (NCE) 901,922, 929 
Frankfort, Kans., (MRK) 637 
Frankfort, Ky. (ORL) 699, 706, 719, 726 
Frankfort, Ohio River Basin, Ky. (Kentucky River) (ORL) 732 
Franklin Falls Dam, N.H. (NED) 38, 54, 76 
Franklin, Tenn. (ORN) 697 
Frazeysburg, Ohio (ORH) 763, 758, 760 
Freeport and Vicinity, Tex. Hurricane-Flood Protection (SWG) 
473, 479, 490 
Freeport Harbor, Tex. (SWG) 466, 477, 483, 493, 496, 501 
Freeport, Ill. (NCR) 828, 833, 836 
Freeport, Pa. (ORP) 795, 798 
Fremont, Ohio, Sandusky River (NCB) 959, 965 
French Broad and Little Pigeon Rivers, Tenn. (ORN) 695 
Freshwater Bayou, La. (LMN) 387 
Friendly, W. Va. (ORH) 762, 756 
Friendsville, Md. (ORP) 798 
Frisco Creek, Hobart, Okla. (SWT) 604 
From North Little Rock to Gillett, Ark. (above Plum Bayou) 
(SWL) 571 
Ft. Riley, Kans. (MRK) 637 
Fullerton, Ky. (ORH) 762, 756 
Fullerton Reservoir, Calif. (SPL) 1021 
Fulton, Ill. (NCR) 828, 833, 836 
G 
Gainesboro, Tenn. (ORN) 697 
Galax, Va. (ORH) 762, 756 
Galena, Galena River, Illinois (NCR) 839 
Galisteo Dam, N. Mex. (SWA) 540, 544, 547, 550 
Gallipolis, Ohio (ORH) 762, 756 
Galveston Harbor and Channel, Tex. (SWG) 466, 477, 483, 493, 
496, 501 
Gapway Swamp, N. C. and S. C. (SAN) 274 
Garden Creek, Casper, Iowa (MRO) 663 
Gardner, Mass. (NED) 27, 52, 74 
Gardners Creek, N. C. (SAW) 237, 249 
Garland City, Ark. (LMN) 400, 409, 422 
Garnett Lake, Pottawatomie Creek, Kansas (MRK) 636, 638 
Garrison Dam & Lake, Missouri River Basin, N. Dak. (MRO) 651, 
655, 659 
Gasconade River, Mo. (MRK) 634 
Gastineau Channel, Alaska (NPA) 1212 
Gaston Reservoir, Va., and N. C. (SAW) 255 
Gate Creek Lake, Oreg. (NPP) 1112, 1126, 1137 
Gathright Lake, James River Basin, Va. (NAO) 212, 217 
Gauley River, W. Va. (ORH) 755 
Gavins Point Dam, Missouri River Basin, S. Dak. (MRO) 651, 655, 
659 
Gaysville Lake, Vt. (NED) 27, 52, 74 
Genegantslet Reservoir, Genegantslet Creek, N. Y. (NAB) 198 
General Edgar Jadwin Dam and Reservoir, Pa. (NAP) 140, 144 
Georges River, Maine (NED) 69 
Georgetown Harbor, S. C. (SAN) 261, 267 
Gering Valley, Nebr. (MRO) 644, 654 
Gibbstown, N. J. (NAP) 152 
Gila River Basin, Ariz. (SPL) 996, 1007, 1008, 1022 
Giles Creek, Elktown River, Nebr. (MRO) 662 
Gill Township levee unit, Indiana (Wabash River) (ORL) 732, 730 
Gillham Lake, Red River Basin, Ark. (SWT) 580, 593, 598, 603 
Glasgow, Mont. (MRO) 662 
Gleason Creek, Nev. (SPK) 1083 
Glen Cove Creek, N. Y. (NAN) 124 
Glen Cove Harbor, N. Y. (NAN) 124 
Gloucester Harbor and Annisquam River, Mass. (NED) 7, 48 
Goat Island Reservoir, Ga. and S. C. (SAS) 284 
Golconda, Ohio River Basin, Ill. (ORL) 732, 726, 730 
Gold Creek, Alaska (NPA) 1213 
Goldsboro, Neuse River, N. C. (SAW) 256 
Gonzales Lake, San Marcos River, Texas (SWF) 528, 530 
Goose Creek, Md. (NAB) 192 
Gordon's Landing Lake Champlain, Vt. (NAN) 124 
Goshen Creek, N. J. (NAP) 150 
Governor's Run, Md. (NAB) 192 
Gowanus Creek Channel, N. Y. (NAN) 124 
Grand Bayou Pass, La. (LMN) 421 
Grand Forks, N. Dak., Red River of the North (NCS) 823 
Grand Haven Harbor and Grand River, Mich. (NCE) 902, 923, 
929 
Grand Isle and Vicinity, La. (hurricane protection) (LMN) 400, 
409 
Grand Lagoon, Panama City, Fla. (SAM) 339, 358 
Grand Marais Habor, Minn. (NCS) 820, 821 
Grand Marais Harbor, Mich. (NCE) 903, 923, 930. 
Grand (Neosho) River, Kans. (SWT) 606 
Grand River at Brunswick, Mo. (MRK) 637 
Grand River at Lansing, Mich. (NCE) 916, 926, 936 
Grand River, Grandville, Mich. (NCE) 941 
Grand Traverse Bay Harbor, Mich. (NCS) 803, 814 
Grand View Bay, N. Y. (NCB) 976 
Grande Ronde Lake, Oreg. (NPW) 1191 
Grande Ronde Valley, Columbia River Basin, Ore. (NPW) 1190, 
1191 
Grandview, Ohio River Basin, Ind. (ORL) 732, 726 
Granite Falls, Minn. (NCS) 824 
See page 1297 for District abbreviations. 1306

INDEX 
Grant Parish, below Colfax, La. (LMN) 423, 424 
Granville, Pa. (ORP) 798 
Grapevine Lake, Tex. (SWF) 512, 522, 526, 529 
Grasse River (Massena) N. Y. (NCB) 976 
Grassy Creek, Jackson County, Ind. (ORL) 732, 730 
Grays Harbor and Chehalis River, Wash. (NPS) 1149, 1160, 1164, 
1168 
Grays Reef Passage, Mich. (NCE) 903, 923, 930 
Grays River, Wash. (NPP) 1134 
Grayson Lake, Ky. (ORH) 741, 752 
Great Bend local protection project, Kansas (SAW) 536, 544, 546 
Great Chazy River, N. Y. (NAN) 124 
Great Falls, Mont. (MRO) 644, 654 
Great Kills Harbor, N. Y. (NAN) 124 
Great Lakes to Hudson River Waterway, N. Y. (NAN) 84, 112, 121 
Great Miami River (ORL) 729 
Great Pee Dee River, S. C. (SAN) 272 
Great Salt Plains Lake, Salt Fork of Arkansas River, Okla. (SWT) 
581, 593, 602 
Great Salt Pond, Block Island, R.I. (NED) 69 
Great Sodus Bay Harbor, N.Y. (NCB) 951, 964, 972 
Great South Bay, N.Y. (NAN) 124 
Great Swamp Reservoir, N.C. (SAW) 255 
Green and Barren Rivers, Ky. (ORL) 699, 700, 718, 724 
Green Bay Harbor, Wis. (NCC) 857, 873, 878, 888, 885 
Green Bay Levee and Drainage District No. 2, Iowa (NCR) 839 
Green Harbor, Mass. (NED) 8 
Green Island Levee and Drainage District No. 1, Iowa (NCR) 839 
Green Peter Lake, Oreg. (NPP) 1118, 1127, 1136, 1137 
Green River Lake, Ky. (ORL) 699, 707, 719, 729 
Green Valley Creek, Solano County, Calif. (SPK) 1083 
Greenfield Bayou levee, Ind. (ORL) 699, 707, 719, 726 
Greenport Harbor, N.Y. (NAN) 124 
Greenup, Ky. (ORH) 762, 756, 760 
Greenvale Creek, Va. (NAO) 223 
Greenville Harbor (MR&T) 1239 
Greenwich Bay, R.I. (NED) 69 
Greenwich Harbor, Conn. (NED) 69 
Greenwich Point Park, Conn. (NED) 72 
Greers Ferry Lake, Ark. (SWL) 551, 558, 562, 570 
Gregory Drainage District, Mo. 828, 833, 836, 839 
Grenada Reservoir (MR&T) 1225, 1235 
Greybull, Wyo. (MRO) 662 
Grove Lake, Soldier Creek, Kans. (MRK) 611, 626 
Guadalupe and San Antonio Rivers, Tex. (SWF) 513, 528 
Guayanes Harbor, P.R. (SAJ) 320 
Guilford Harbor, Conn. (NED) 69 
Guilford Point Beach (Jacobs Beach), Guilford, Conn. (NED) 72 
Gulf Beach, Milford, Conn. (NED) 72 
Gulf Intracoastal Waterway Between Apalachee Bay, Fla., and 
Mexican Border (Galv. Dist.) (SWG) 467, 478, 484, 493, 499, 501 
Gulf Intracoastal Waterway between Apalachee Bay, Fla., and 
Mexican Border (Mobile District) (SAM) 339, 358 
Gulf Intracoastal Waterway between Apalachee Bay, Fla., and 
Mexican Border (New Orleans District) (LMN) 387, 408, 420 
Gulf Intracoastal Waterway, St. Marks to Tampa Bay, Fla. (SAJ) 
320 
Gulfport Harbor, Miss. (SAM) 340, 358 
Gull Lake Reservoir, Minn. (NCS) 819 
Guthrie, Okla. (Cottonwood Creek) (SWT) 606 
Guttenberg, Iowa (NCS) 807,815 
Guyandot River, W. Va. (ORH) 755 
Gypsum and Dry Creeks, Wichita, Kans. (SWT) 604 
Gypsum, Gypsum Creek, Kans. (MRK) 611,626 
H 
Hackleman Corners Reservoir, Cedar Creek, Mo. (MRK) 636 
Haleiwa Beach, Oahu, Hawaii (POD) 1093 
Haleiwa Small Boat Harbor, Oahu, Hawaii (POD) 1093 
Halfmoon Bay Harbor, Calif. (SPN) 1047 
Hall Meadow Brook Dam, Conn. (NED) 35, 54, 75 
Hamlin Beach Harbor, N. Y. (NCB) 976 
Hamlin Beach State Park, N. Y. (NCB) 958, 965 
Hammersley Inlet, Wash. (NPS) 1169, 1170 
Hammon Bay, Mich. (NCE) 940 
Hammonasset Beach, Madison, Conn. (NED) 72 
Hammondsport, Oswego River Basin, N. Y. (NCB) 977 
Hampton Beach, Hampton, N. H. (NED) 72 
Hampton Creek, Va. (NAO) 223 
Hampton Harbor, N.H. (NED) 8, 48 
Hampton Roads and Harbors of Norfolk and Newport News, Va. 
Collection and Removal of Drift (NAO) 203, 215 
Hampton Roads, Va. (NAO) 204, 215 
Hana Small Boat Harbor, Maui, Hawaii (POD) 1093 
Hanalei Bay Small Boat Harbor, Kauai, Hawaii (POD) 1093 
Hanapepe Bay, Kauai, Hawaii (POD) 1093 
Hanapepe River, Kauai, Hawaii (POD) 1094 
Hancock Brook Lake, Conn. (NED) 35, 54, 75 
Hanging Rock, Ohio (ORH) 762, 756 
Hannibal Harbor, Mo. (NCD) 850 
Hannibal, Mo. (NCR) 839 
Harbor of Baltimore, Md. - Prevention of Obstructions and 
Injurious Deposits (NAB) 158, 180 
Harbor of Refuge and Point Judith Pond, Point Judith, R.I. (NED) 
69 
Harbor of Refuge at Harbor Beach, Lake Huron, Mich. (NCE) 
903, 923, 930 
Harbor of Refuge, Block Island, R.I. (NED) 8, 48 
Harbor of Refuge, Delaware Bay, Del. (NAP) 150 
Harbor of Refuge, N. C. (SAW) 254 
Harbors at Washington Island, Wis. (NCC) 893 
Harlan County Lake, Republican River, Nebr. (MRK) 611, 626, 
636 
Harlan, Ky. (ORN) 697 
Harlem River, N.Y. (NAN) 124 
Harpers Ferry, W. Va. (NAB) 198 
Harraseeket River, Maine (NED) 69 
Harriet Island Harbor, St. Paul, Minn. (NCD) 849 
Harrisburg, Ohio River Basin, Ill. (ORL) 732, 726, 730 
Harrison County, Miss., shore protection (SAM) 375 
Harrisonville and Ivy Landing Drainage and Levee District No. 2, 
Ill. (LMS) 456 
Harrisville, Mich. (NCE) 939, 940 
Harrodsburg (Town Creek), Ky. (ORL) 730 
Harry S. Truman Dam and Lake, Osage River, Mo. (MRK) 612, 
627,636 
Hartford, Conn. (NED) 74, 75, 78 
Hartford, W> Va. (ORH) 762, 756 
Hartwell Dam and Reservoir, Ga. and S. C. (SAS) 280, 282, 284 
Harvey Canal - Bayou Barataria Levee, La. (LMN) 401,409 
Harwick Dam, Vt. (NED) 126 
Hastings Harbor, Minn. (NCD) 849 
Hastings, Minn., Vermillion River (NCS) 823 
Havre, Mont. (MRO) 662 
Hawesville, Ohio River Basin, Ky. (ORL) 732, 726, 730 
Hay (West Harbor) Fisher's Island, N. Y. (NED) 69 
Hays, Big Creek, Kans. (MRK) 612, 627 
Haysi, Va. (ORH) 763, 758, 760 
Heckleman Corners Lake, Cedar Creek, Mo. (MRK) 638 
See page 1297 for District abbreviations. 1307

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Heeia-Kea Small Boat Harbor, Oahu, Hawaii (POD) 1093 
Heise-Roberts Area, Snake River, Idaho (NPW) 1191 
Heise-Roberts Extension, Columbia River Basin, Idaho (NPW) 
1190, 1191 
Helena Harbor, Ark. (LMM) 439, 442 
Helens Creek, Md. (NAB) 192 
Helm Dam and Reservoir, Ill. (ORL) 729 
Hempstead County levee district No. 1, Ark. (LMN) 423, 424 
Hempstead Harbor, N. Y. (NAN) 124 
Henderson County Draiange District No. 3, Ill. (NCR) 839 
Henderson County Drainage District No. 1, Ill. (NCR) 839 
Henderson County Drainage District No. 2, Ill. (NCR) 839 
Henderson River, Illinois (NCR) 839 
Henderson, W. Va. (ORH) 762, 756 
Hendrick's Harbor, Maine (NED) 69 
Herkimer, N.Y., Mohawk River (NAN) 102, 114 
Herreid, Spring Creek, S. Dak. (MRO) 662 
Herring Bay and Rockhold Creek, Md. (NAB) 158, 180 
Herring Creek, Md. (NAB) 192 
Hickman Harbor, Ky. (LMM) 439, 442 
Hidden Reservoir, Fresno River, Calif. (SPK) 1058, 1074 
Higginsport, Ohio (ORH) 762, 756 
Highland Bayou, Tex. (SWG) 474, 479, 490 
Hills Creek, Oreg. (NPP) 1119, 1127, 1136, 1137 
Hillsboro Reservoir, N. C. (SAW) 255 
Hillsborough Bay, Fla. (SAJ) 327 
Hillsdale Lake, Big Bull Creek, Kans. (MRK) 613, 627, 636 
Hilo Harbor, Hawaii, Hawaii (POD) 1093 
Hingham Harbor, Mass. (NED) 69 
Hiwassee River, Tenn. (ORN) 695 
Hockingport, Ohio (ORH) 762, 756 
Hodges Reservoir, San Dieguito River Basin, Calif. (SPL) 1022 
Hodges Village Dam, Mass. (NED) 43, 55, 77 
Hogtown Creek, Fla. (SAJ) 305, 310 
Holbrook Levee, Little Colorado River, Colorado River Basin, Ariz. 
(SPL) 1022 
Holla Bend Bottom, Arkansas River, Ark. (SWL) 571 
Holland Harbor, Mich. (NCE) 904, 923, 930 
Holley Lake, Calapooya River (NPP) 1137, 1141 
Holmes Creek, Fla. (SAM) 374 
Holston River, Tenn. (ORN) 695 
Holyoke, Mass. (NED) 74, 78 
Homer Harbor, Alaska (NPA) 1201, 1208, 1210 
Hominy Swamp, N. C. (SAW) 237, 249 
Homme Dam and Reservoir, N. Dak. (NCS) 808, 815 
Homochitto River, Miss. (LMK) 435, 436 
Homosassa River, Fla. (SAJ) 320 
Honey Creek levee, Ohio River Basin, Ind. (Wabash River) (ORL) 
732, 726 
Honey Hill Reservoir, N.H. (NED) 74, 78 
Honga River and Tar Bay (Barren Island Gaps), Md. (NAB) 158, 
180 
Honokahau Small Boat Harbor, Hawaii, Hawaii (POD) 1085, 
1090, 1091 
Honolulu Harbor, Oahu, Hawaii (POD) 1086, 1090, 1091 
Hooper, Nebr. (MRO) 662 
Hoosick Falls, N.Y., Hoosie River (NAN) 126 
Hop Brook Lake, Conn. (NED) 36, 54, 75 
Hopkins, Mo. (MRK) 637 
Hopkinton-Everett Lakes, N.H. (NED) 38, 55, 76 
Hoquaim River, Wash. (NPS) 1169, 1170 
Hords Creek Lake, Tex. (SWF) 513, 523 
Horn Harbor, Va. (NAO) 223 
Hornell, N. Y. (NAB) 172, 196 
Horseshoe Cove, Fla. (SAJ) 320 
Hoskins Creek, Va. (NAO) 223 
Houma Navigation Canal, La. (LMN) 390, 408 
Housatonic River Basin, Conn. (NED) 33, 75 
Housatonic River, Conn. (NED) 9, 48 
Houston Ship Channel, Tex. (SWG) 469, 478, 486, 493, 496, 502 
Howard A. Hanson Dam and Reservoir, Wash. (NPS) 1154, 1161, 
1166 
Howards Mill Lake, N. C. (SAW) 255, 256 
Hudson River Channel, N.Y. (NAN) 86, 112 
Hudson River, Fla. (SAJ) 320 
Hudson River, N.Y. (NAN) 85, 112, 121, 124 
Hugo Lake, Kiamichi River, Okla. (SWT) 581, 593, 598, 603 
Hulah Lake, Caney River, Okla. (SWT) 581, 593, 602 
Humboldt River and Tributaries, Nev. (SPK) 1083 
Humbolt Harbor and Bay, Calif. (SPN) 1026, 1040, 1047 
Hungington, Mass. (NED) 78 
Hunt Drainage District and Lima Lake Drainage District, Ill. 
(NCR) 828, 834, 836 
Hunting Island Beach, S. C. (SAN) 263, 267 
Huntington Harbor, N. Y. (NAN) 124 
Huntington Lake, Ind. (ORL) 699, 707, 719 
Huntington, W. Va. (ORH) 762, 756 
Huron Harbor, Ohio (NCB) 952, 964, 972 
Hutchinson Levee, Kans. (SWT) 603, 605 
Hutchinson, Minn., South Fork, Crow River (NCS) 823 
Hyannis Harbor, Mass. (NED) 69 
Hyde County Dike, N. C. (SAW) 256 
I 
Iao Stream, Maui, Hawaii (POD) 1094 
Ice Harbor at Marcus Hook, Pa. (NAP) 150 
Ice Harbor Lock and Dam, Snake River, Wash. (NPW) 1181, 1188, 
1193, 1198 
Ida Grove, Iowa (MRO) 645, 654 
Iliuliuk Harbor, Alaska (NPA) 1212 
Illinois and Mississippi River Canal, Ill. (NCR) 825, 833 
Illinois River, Ill. (MR&T) 1234, 1252 
Illinois Waterway, Ill. and Ind. (NCC) 858, 873, 879, 890, 891, 892, 
885, 895 
Imperial Beach, San Diego County, Calif. (SPL) 1014 
Inavale, Nebr. (MRK) 637 
Indian Bend Wash., Ariz. (SPL) 996 
Indian Creek, Corydon, Ind. (ORL) 732, 730 
Indian Creek Dam and Lake, Iowa (MRO) 662 
Indian Grave Drainage District, Ill. (NCR) 829, 834, 836 
Indian River Inlet and Bay, Del. (NAP) 133, 143 
Indiana Harbor, Ind. (NCC) 860, 874 
Indiana Hill, Ohio (ORL) 731 
Indianapolis, Ind, (ORL) 699, 708, 719, 730 
Indianola, Republican River, Nebr. (MRK) 636, 637, 638 
Industry, Pa. (ORP) 795, 798 
Inland Waterway from Chincoteague Bay, Va., to Delaware Bay, 
Del. (NAP) 134, 143 
Inland Waterway from Delaware River to Chesapeake Bay, Del., & 
Md. (NAP) 134, 144, 149 
Inland Waterway from Franklin to Mermentau River, La. (LMN) 
421 
Inland Waterway, Rehoboth Bay to Delaware Bay, Del. (NAP) 
133, 143 
International Boundary Waters Boards 1280 
International Great Lakes Levels Board 1286 
International Great Lakes Study Group 1288 
International Kootenay Lake Board of Control 1292 
International Lake Champlain Board of Control 1281 
International Lake Memphremagog Board 1281 
International Lake of the Woods Control Board 1290 
See page 1297 for District abbreviations. 1308

INDEX 
International Lake Superior Board of Control 1289 
International Niagara Board of Control 1283 
International Niagara Committee 1284 
International Osoyoos Lake Board of Control 1292 
International Pembina River Engineering Board 1291 
International Prairie Portage Board of Control 1289 
International Rainy Lake Board of Control 1290 
International Skagit River Board of Control 1292 
International Souris-Red Rivers Engineering Board 1291 
International St. Croix River Board of Control 1280 
International St. John River Engineering Board 1281 
International St. Lawrence River Board of Control 1282 
Intracoastal Waterway, Calcosahatchee River to Anclote River, 
Fla. (SAJ) 292, 307 
Intracoastal Waterway from the Mississippi River to Bayou Teche, 
La. (LMN) 421 
Intracoastal Waterway, Jacksonville to Miami, Fla. (SAJ) 292, 308 
Intracoastal Waterway, Miami to Key West, Fla. (SAJ) 320 
Investigations and Supervision of Projects under Federal Water 
Power Act 1277 
Iola Levee, Kans. (SWT) 603, 605 
Iowa River-Flint Creek Levee District No. 16, Iowa (NCR) 829, 
834, 836, 841 
Ipswich River, Mass. (NED) 69 
Irondale Lake, Mo. (LMS) 459 
Irondequoit Bay Harbor, N. Y. (NCB) 952, 964 
Ironton, Ohio (ORH) 762, 756 
Irvington Harbor, N. Y. (NAN) 124 
Isabella Reservoir, Kern River, Calif. (SPK) 1059, 1075 
Island Creek, Md. (NAB) 192 
Island Creek, St. Georges Island, Md. (NAB) 159, 180 
Island levee, Ind. (ORL) 699, 708, 719, 726 
Isle au Haut Thoroughfare, Maine (NED) 69 
Isle of Shoals Harbor, Maine and N.H. (NED) 69 
Ithaca, N. Y., Cahuga Inlet (NCB) 959, 965 
Ithaca, Oswego River Basin, N.Y.: Deferred-Cascadilla Creek, Fall 
Creek (NCB) 977 
J 
J. Percy Priest Dam and Reservoir, Ohio River Basin, Tenn. 
(ORN) 685, 688, 696 
Jackson and East Jackson, Miss. (SAM) 346, 360 
Jackson County, Fla. (SAM) 375 
Jackson Creek, Va. (NAO) 206, 215 
Jackson Hole, Snake River, Wyo. (NPW) 1191 
Jackson, Ky. (Kentucky River Basin) (ORL) 732, 726, 730 
Jacksonville Harbor, Fla. (SAJ) 293 
Jamaica Bay, N. Y. (NAN) 124 
James River and Tributaries at Springfield, Mo. (SWL) 572 
James River, Va. (NAO) 207, 215 
Jamestown Lake, N. Dak. (MRO) 662 
Janesville and Indian Ford Dams, Wis. (NCR) 839 
Jefferson River, Three Forks, Mont. (MRO) 663 
Jeffersonville-Clarksville, Ohio River Basin, Ind. (ORL) 732, 726, 
730 
Jemez Canyon Dam, N. Mex. (SWA) 546, 545,547, 550 
Jenkins, Tom Dam, Ohio River Basin, Ohio (ORH) 748, 753, 758 
Jenks Levee, Okla. (SWT) 603, 605 
Jennings Beach, Fairfield, Conn. (NED) 72 
Jim Woodruff lock and dam, Ga., and Fla. (SAM) 353, 361 
Joe Creek, Tulsa, Okla. (SWT) 604 
John Day Lock and Dam, Columbia River, Oregon & Wash. 
(NPW) 1181, 1188, 1194 
John Day River Area, Clatsop County, Oreg. (NPP) 1190, 1139 
John Day River, Columbia River Basin, Oreg. (NPW) 1177, 1187 
John Drainage District, Oreg. (NPP) 1138, 1140 
John H. Kerr Dam & Reservoir, Va. and N. C. (SAW) 245, 250, 
255 
John Martin Reservoir, Arkansas River, Colo. (SWA) 536, 544, 546 
John Redmond Dam & Lake, Grand (Neosho) River Basin, Kan. 
(SWT) 581, 594, 598, 602 
John W. Flannagan Dam and Lake, Ohio River Basin, Va. (ORH) 
741, 752, 758 
Johns Island, S. C. (SAN) 273 
Johns Pass, Fla. (SAJ) 320 
Johnson Bayou, La. (SWG) 491 
Johnson Creek, Vicinity of Portland, Oreg. (NPP) 1137, 1141 
Johnson Gorge, Vt. (NAN) 126 
Johnsonburg, Pa. (ORP) 795, 798 
Johnstown, Pa. (ORP) 773, 787, 795 
Jones Bluff lock and dam, Ala. (SAM) 350, 360 
Jones Inlet, N. Y. (NAN) 87, 112 
Josias River, Maine (NED) 69 
Joyce Creek, Camden County, N. C. (SAW) 238, 249 
Juneau Harbor, Alaska (NPA) 1212 
K 
Kahului Harbor, Maui, Hawaii (POD) 1086, 1090, 1091, 1093 
Kailua Small Boat Harbor, Oahu, Hawaii (POD) 1093 
Kake Harbor, Alaska (NPA) 1201, 1210 
Kalama River (South Area) Levees, Cowlitz County, Wash. (NPP) 
1140 
Kalamazoo River, Kalamazoo, Mich. (NCE) 916, 926, 936 
Kalaupapa Harbor, Molokai, Hawaii (POD) 1093 
Kanawha River, W. Va. (ORH) 736, 751, 755 
Kankakee River, Ill. & Ind. (NCC) 895 
Kanopolis Lake, Smoky Hill Reservoir, Kans. (MRK) 613, 627, 
636 
Kansas City, Kansas River, Kans. (1962 Mod.) (MRK) 613, 627 
Kansas Citys on Missouri and Kansas River, Mo. and Kans. 
(MRK) 614, 627, 630, 637 
Karlson Island, Clatsop County, Oreg. (NPP) 1139 
Kaskaskia River, Ill. (LMS) 456, 459 
Kaunakakai Harbor, Molokai, Hawaii (POD) 1093 
Kaunakakai Stream, Molokai, Hawaii (POD) 1094 
Kaw Lake, Arkansas River, Okla. (SWT) 582, 594, 598 
Kawaihae Harbor, Hawaii, Hawaii (POD) 1087, 1090, 1091 
Kawainui Swamp, Oahu, Hawaii (POD) 1094 
Kaweah and Tule Rivers, including Terminus and Success 
Reservoirs, Calif. (SPK) 1059, 1075 
Kawkawlin River, Mich. (NCE) 917, 926, 936 
Kays Creek, Layton, Utah (SPK) 1061, 1075 
Kechi Lagoon, Oahu, Hawaii (POD) 1093 
Keene, N. H. (NED) 78 
Kehoe Lake, Ky. (ORH) 741, 752 
Keithsburg Drainage District, Illinois (NCR) 839 
Kelleys Island, Ohio (NCE) 905, 923, 930 
Kendrick, Potlatch River, Columbia River Basin, Idaho (NPW) 
1190, 1191 
Kennebec River, Maine (NED) 69 
Kennebunk River, Maine (NED) 9, 48 
Kenosha Harbor, Wis. (NCC) 861,874, 880, 893, 886 
Kentucky River, Ky. (ORL) 699, 700, 718, 725, 729 
Keokuk Harbor, Iowa (NCD) 849 
Kerr, Robert S. Lock and Dam and Lake (No. 15), Arkansas River, 
Okla. (SWT) 589, 596, 599, 600 
Kervaunee Harbor, Wis. (NCC) 886 
Ketchikan Harbor, Alaska (NPA) 1212 
Kewaunee Harbor, Wis. (NCC) 862, 874, 881 
Keweenaw Waterway, Mich. (NCS) 803, 814, 817 
See page 1297 for District abbreviations. 1309

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Key West Harbor, Fla. (SAJ) 320, 322 
Keyport Harbor, N.J. (NAN) 124 
Keystone Lake, Arkansas River, Okla. (SWT) 567, 589, 595, 598, 
600, 602 
Kikiaola Small Boat Harbor, Kauai, Hawaii (POD) 1093 
King Cove Harbor, Alaska (NPA) 1202, 1210 
Kings Creek, Va. (NAO) 223 
Kingston-Edwardsville, Pa. (NAB) 198 
Kingston Harbor (North Plymouth), Mass. (NED) 69 
Kingston Harbor, Wash. (NPS) 1169, 1170 
Kinzua Dam and Allegheny Lake, Ohio River Basin, Pa. and N.Y. 
(ORP) 774, 787 
Kishwaukee River at DeKalb, Illinois (NCR) 839 
Kissimmee River, Fla. (SAJ) 320 
Kittanning, Pa., part I (ORP) 795, 798 
Kittanning, Pa., part II (ORP) 795, 798 
Kitzmiller, Md. (NAB) 198 
Klamath River Basin, Calif. (SPN) 1035, 1041, 1046 
Klutina River, Copper Center, Alaska (NPA) 1206, 1209, 1211 
Knappa area, Clatsop County, Oreg. (NPP) 1139 
Knapps Narrows, Md. (NAB) 192 
Knife River Harbor, Minn. (NCS) 803, 814, 817 
Knightville Dam, Mass. (NED) 27, 52, 74 
Knobbs Creek, N.C. (SAW) 254 
Kodiak Harbor, Alaska (NPA) 1212 
Kootenai Flats Area near Bonners Ferry, Idaho (NPS) 1172 
Kootenai River, Idaho and Mont. (NPS) 1170 
Kuliouou Stream, Oahu, Hawaii (POD) 1088, 1090 
L 
L'Anguille River, Ark. (MR&T) 1234 
La Farge Lake and channel improvement, Kickapoo River, Wis. 
(NCS) 808, 815 
La Point Harbor, Wis. (NCS) 821 
La Trappe River, Md. (NAB) 192 
Lac La Belle Harbor, Mich. (NCS) 804, 814 
Lac qui Parle Lake, Minnesota River, Minn. (NCS) 808, 815 
Lackawanna, N.Y., Smokes Creek (NCB) 960, 965 
Lackawanna River Basin, Pa. (NAB) 168, 183, 194 
LaCrosse, Wis. (NCS) 824 
Lafayette Lake, Ind. (ORL) 699, 708, 719 
Lafayette River, Va. (NAO) 223 
Lagoon Pond, Martha's Vineyard, Mass. (NED) 10, 48 
LaGrange Bayou, Fla. (SAM) 340, 358 
Lahaina Small Boat Harbor, Maui, Hawaii (POD) 1087, 1090, 
1092 
Lake Ashtabula and Baldhill Dam, Sheyenne River, N. Dak. 
(NCS) 809, 815 
Lake Brownwood Dam Modification, Texas (SWF) 530 
Lake Charles Deep Water Channel, La. (LMN) 421 
Lake Chautauqua and Chadakoin River, N.Y. (ORP) 795, 798 
Lake City Harbor, Minn. (NCD) 849 
Lake City, Tenn. (ORN) 696 
Lake Crescent and Dunns Creek, Fla. (SAJ) 320 
Lake Crockett, Wash. (NPS) 1169, 1170 
Lake Cumberland (Wolf Creek Dam), Ohio River Basin, Ky. 
(ORN) 686, 688, 696 
Lake Douglas, Decatur County, Ga. (SAM) 347, 360 
Lake Erie-Ohio River Canal, Ohio and Pa. (ORP) 766, 786 
Lake Greeson, Little Missouri River, Ark. (LMK) 430, 432, 436 
Lake Hudson, Arkansas River Basin, Okla. (SWT) 589, 595, 600, 
602, 604 
Lake Kemp, Wichita River, Tex. (SWT) 582, 594, 598 
Lake Meredith, Canadian River, Texas (SWT) 604 
Lake Montauk Harbor, N.Y. (NAN) 87, 112 
Lake 0' the Pines, Texas (LMN) 401, 409, 419, 422 
Lake Ogleton, Md. (NAB) 192 
Lake Ouachita, Ouachita River, Ark. (LMK) 429, 432, 436 
Lake Pontchartrain and Vicinity, Louisiana (hurricane protection) 
(LMN) 402, 409 
Lake Pontchartrain, La. (MR&T) 1230, 1247 
Lake Providence Harbor, La. (LMK) 427, 432 
Lake Raystown, Raystown Branch, Juniata River, Pa. (NAB) 169 
Lake River Delta Area, Wash. (NPP) 1138, 1140 
Lake River, Wash. (NPP) 1134 
Lake St. Clair, Mich., Channels (NCE) 905, 923, 931 
Lake Texarkana, Texas (LMN) 403, 409, 419, 422 
Lake Traverse and Bois de Sioux River, S. Dak., N. Dak. and 
Minn. (NCS) 809, 815 
Lake Traverse, Minn. and S. Dak. (NCS) 821 
Lake Washington Ship Canal, Wash. (NPS) 1150, 1160, 1165, 1168 
Lakeport Reservoir, Scotts Creek, Calif. (SPK) 1061, 1075 
Lakeview Lake, Tex. (SWF) 513, 523 
Lamoille River, Vt. (NAN) 126 
Lamprey River, N.H. (NED) 69 
Lancaster, Cayuga Creek, N.Y. (NCB) 977 
Lansing Harbor, Iowa (NCD) 849 
Lapwai Creek, Culdesac, Idaho (NPW) 1178, 1187 
Larchmont Harbor, N.Y. (NAN) 87, 113 
Largo Sound Channel, Fla. (SAS) 320 
Las Animas local protection project, Colo. (SWA) 537, 544, 546 
Las Cruces local protection project, New Mexico (SWA) 546 
Las Vegas Wash Tributaries, Colorado River Basin, Nev. (Inactive) 
(SPL) 1022 
Latrobe, Pa. (ORP) 795, 798 
Laurel River Lake, Ky. (ORN) 686, 688 
Lavaca-Navidad Rivers, Tex. (SWG) 492 
Lavon Lake Modification and East Fork Channel Improvement, 
Tex. (SWF) 515, 523 
Lavon Lake, Tex. (SWF) 514, 523, 526, 529 
Lawrence, Kansas River, Kans. (MRK) 614, 627, 636, 637 
Lawrenceburg, Ohio River Basin, Ind. (ORL) 732, 726, 730 
Lazer Creek Reservoir, Ga. (SAM) 354, 361 
Leading Creek, W. Va. (ORH) 763, 758, 760 
Leaf and Chickasawhay Rivers, Miss. (SAM) 374 
Leavenworth, Ohio River Basin, Ind. (ORL) 732, 727 
Lebanon Junction, Ky. (ORL) 732, 730 
Leech Lake Reservoir, Minn. (NCS) 819 
Leesville Reservoir, Va. (SAW) 255 
Leetonia, Ohio (ORP) 798 
Leetsdale, Pa. (ORP) 795, 798 
Leipsic River, Del. (NAP) 150 
Leland Harbor, Mich. (NCE) 939, 940 
Lemon Creek, N.Y. (NAN) 124 
Les Cheneaux Islands Channels, Mich. (NCE) 906, 931 
Letart Falls, Ohio (ORH) 762, 756, 924 
Letart, W. Va. (ORH) 762, 756 
Levee unit 3, East Fork of White River, Ind. (ORL) 733 
Levee unit 17, Indiana (Wabash River Basin) (ORL) 727 
Levee unit 6, Ohio River Basin, Ill. (Wabash River) (ORL) 733 
Levee unit 6, Wabash River, Ill. (Wabash River Basin) (ORL) 727 
Levee unit 5, Wabash River, Ind. (ORL) 709, 699, 719, 730 
Levee unit 8, White River, Ind. (ORL) 733, 730 
Levee unit 2, White River, Ind. (ORL) 733, 727 
Levee unit 7, White River, Ind. (Wabash River Basin) (ORL) 727 
Levee unit 1, White River, Ind. (Wabash River Basin) (ORL) 699, 
709, 719, 727 
Levee units 1 and 2, Eel River, Ohio River Basin, Ind. (Wabash 
River Basin) (ORL) 732, 727 
Levee units 1 and 2, Wabash River, Ill. (ORL) 733, 727 
Levee units 3 and 4, Wabash River, Ill. (ORL) 733 
See page 1297 for District abbreviations. 1310

INDEX 
Levee Units 9 and 10, White River, Ind. (ORL) 733 
Lewes, Sussex County, Del. (NAP) 151 
Lewis & Clark River area, Clatsop County, Oreg. (NPP) 1139 
Lewis River Basin, Wash. (NPP) 1140 
Lewis River, Wash. (NPP) 1102, 1124, 1138, 1141 
Lewisport, Ky. (ORL) 733, 727 
Lewiston-Clarkston Levees. (NPW) 1191 
Lewisville Dam, Tex. (SWF) 514, 523, 526, 529 
Lexington, Mich. (NCE) 940 
Libby Dam and Lake, Kootenai River, Mont. (NPS) 1158, 1162, 
1167 
Liberty Local Protection Project, Tex. (SWG) 474, 479, 490 
Lick Run, Roanoke, Va. (SAW) 238, 249 
Licking River, Ky. (ORL) 729 
Lighthouse Point Park (area 9), Conn. (NED) 72 
Lightning Creek, Clark Fork, Idaho (NPS) 1171 
Lincoln Lake, Ill. (ORL) 699, 709, 720 
Linton, N. Dak. (MRO) 645, 654 
Lisle, N.Y. (NAB) 170, 195, 196 
Little Bay De Noc, Gladstone Harbor & Kipling, Mich. (NCC) 893 
Little Bay, Tex. (SWG) 491 
Little Bear Creek, DeQueen, Ark. (SWT) 604 
Little Blue River Channel Improvement, Little Blue River, Mo. 
(MRK) 614, 627 
Little Blue River Lakes, Mo. (MRK) 615, 627 
Little Buffalo Reservoir, N.C. (SAW) 255 
Little Caillou Bayou, La. (LMN) 421 
Little Calumet River and Tributaries, Ill. and Ind. (NCC) 896, 895 
Little Cove Creek, Glencoe, Ala. (SAM) 375 
Little Creek, Kent Island, Md. (NAB) 192 
Little Dell Reservoir, Utah (SPK) 1062, 1075 
Little Egg Harbor, N.J. (NAP) 150 
Little Goose Lock and Dam, Snake River, Wash. (NPW) 1182, 
1188, 1194, 1198 
Little Harbor, N.H. (NED) 69 
Little Kanawha River, W. Va. (ORH) 755 
Little Lake Harbor, Mich. (NCE) 906, 924, 931 
Little Machipongo River, Va. (NAO) 223 
Little Manatee River, Fla. (SAJ) 320 
Little Miami River (ORL) 729 
Little Mill Creek, Del. (NAP) 152 
Little Missouri River, Ark. (LMK) 435 
Little Missouri River below Murfreesboro, Ark. (LMK) 436 
Little Neck Bay, N.Y. (NAN) 124 
Little Nemaha River, Nebr. (MRO) 645, 654 
Little Papillion Creek, Nebr. (MRO) 645, 654 
Little Pee Dee River, S.C. (SAN) 272 
Little River and Cayuga Creek, Cayuga Island, N.Y. (NCB) 960, 
966 
Little River, at Cauyga Island Niagara Falls, N.Y. (NCB) 976 
Little River (Creek), Va. (NAO) 223 
Little River, Del. (NAP) 150 
Little River Diversion Channel, Mo. (MR&T) 1234 
Little River drainage (MR&T) 1226, 1251 
Little River, La. (LMK) 435 
Little Rock Levee, Ark. (East End-Fourche Bayou) (SWL) 551, 
555, 562, 564 
Little Sioux River and Tributaries, Iowa (MRO) 646, 654 
Little Sodus Bay Harbor, N.Y. (NCB) 952, 964, 972 
Little Tallahatchie River, Miss. (LMK) 435 
Little Tennessee River, Tenn. (ORN) 695 
Little Valley Wash. Magna, Utah (SPK) 1083 
Little Wicomico River, Va. (NAB) 159, 181 
Little Wood River (Carey), Columbia River Basin, Idaho (NPW) 
1190, 1189, 1191 
Littleville Lake, Mass. (NED) 28, 52, 74 
Livingston, Mont. - Yellowstone River and Fleshman Creek 
(MRO) 663 
Lock and dam No. 2, Ark. (SWL) 553, 561, 565 
Lock and dam No. 4, Ark. (SWL) 553, 561, 565 
Lock and dam No. 3, Ark. (SWL) 553, 561, 565 
Lock and dam No. 13, Ark. (SWL) 553, 561, 565, 566 
Lock and dam No. 9, Ark. (SWL) 553, 561, 565 
Lock and dam No. 5, Ark. (SWL) 553, 561,565 
Lock and Dam No. 13, Channel Improvement, Arkansas River 
(SWL) 574 
Lock and Dam No. 18, Verdigris River (SWT) 566 
Lock and Dam No. 17, Verdigris River (SWT) 566 
Locklies Creek, Va. (NAO) 223 
Lockwoods Folly River, N.C. (SAW) 229, 247 
Logan, Ohio (ORH) 763, 758 
Lone Rock Lake, White River, Ark. (SWL) 570, 571 
Long Beach Island, N.J. (NAP) 151 
Long Branch Lake, Little Chariton River Basin, Mo. (MRK) 615, 
627 
Long Island Intracoastal Waterway, N.Y. (NAN) 88, 113 
Lookout Point Lake, Oreg. (NPP) 1119, 1127, 1136, 1137 
Lorain Harbor, Ohio (NCB) 953, 964, 973 
Los Angeles and Long Beach Harbors, Calif. (SPL) 1013 
Los Angeles County drainage area, California (SPL) 998, 1008, 
1011, 1020 
Los Angeles River Basin, Calif. (SPL) 1015, 1016, 1017, 1018 
Los Esteros Reservoir and modification of Alamogordo Dam, Pecos 
River, New Mexico (SWA) 538, 544, 547 
Lost Creek Lake, Oreg. (NPP) 1120, 1127 
Lost Creek, Seneca, Mo. (SWT) 604 
Lost River, Minn. (NCS) 823 
Louisville Dam and Lake, Ill. (ORL) 699, 710, 720, 729 
Louisville, Ohio River Basin, Ky. (ORL) 699, 710, 720, 733, 727, 
730 
Loup River, Columbus, Nebr. (MRO) 646, 654 
Low Head Locks and Dams, Okla. (SWT) 574, 592, 598 
Lowell Creek, Alaska (NPA) 1213 
Lowell, Mass. (NED) 76, 78 
Lower Arkansas Basin, Ark. (MR&T) 1225 
Lower Arkansas River, Ark. (MR&T) 1232 
Lower Auchumpkee Reservoir, Ga. (SAM) 354 
Lower Big Sioux River, Iowa and S. Dak. (MRO) 662 
Lower Columbia River Basin Bank Protection Works, Oreg. and 
Wash. (NPP) 1113, 1126 
Lower Columbia River Basin, Oreg. and Wash. (NPP) 1112, 1126 
1138, 1140 
Lower Gila River Levee and Channel Improvements, Downstream 
from Painted Rock Reservoir, Ariz. (SPL) 996, 1008 
Lower Grand River, Mo. (MRK) 638 
Lower Granite Lock and Dam, Snake River, Wash. (NPW) 1183, 
1188, 1195, 1198 
Lower Heart River, N. Dak. (MRO) 662 
Lower Machodoc Creek, Va. (NAB) 192 
Lower Monumental Lock and Dam, Snake River, Wash. (NPW) 
1184, 1188, 1196, 1198 
Lower Red River - South Bank, Red River Levees, La. (MR&T) 
1224, 1231, 1241, 1247 
Lower San Francisco Bay, Calif. (SPN) 1047 
Lower San Joaquin River and tributaries, including Tuolumne and 
Stanislaus Rivers, Calif. (SPK) 1063, 1075, 1076 
Lower St. Francis River (MR&T) 1226 
Lower Thorofare, Deal Island, Md. (NAB) 159, 181 
Lower Walla Walla River, Wash. (NPW) 1190 
Lower White River and Basin, Ark. (MR&T) 1233, 1251, 1256 
Lower Woonsocket, R.I. (NED) 22, 51, 73 
Lowes Wharf, Md. (NAB) 160, 181 
See page 1297 for District abbreviations. 1311

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Loyalhanna Lake, Ohio River Basin, Pa. (ORP) 775, 787 
Lubec Channel, Maine (NED) 69 
Lucky Peak Reservoir, Boise River, Idaho (NPW) 1178, 1187 
Ludington Harbor, Mich. (NCE) 906, 931,924 
Ludlow, Ohio River Basin, Ky. (ORL) 733, 727 
Ludlow Reservoir, Vt. (NED) 74, 78 
Lukfata Lake, Red River Basin, Okla. (SWT) 582, 594, 598, 603 
Lumber River, N.C. & S.C. (SAN) 272 
Lutsen Harbor, Minn. (NCS) 821 
Lyford levee unit, Wabash River, Ind. (ORL) 733, 730 
Lyman Creek, Idaho (NPW) 1178, 1187 
Lynches River & Clark Creek, S.C. (SAN) 272 
Lynn Harbor, Mass. (NED) 69 
Lynn-Nahant Beach, Mass. (NED) 72 
Lynnhaven Inlet, Va. (NAO) 208, 215 
Lytle and Cajon Creeks channel improvements, Calif. (SPL) 1021 
Lytle and Warm Creeks, Santa Ana River Basin, Calif. (SPL) 1000, 
1008 
M 
Maalaea Small Boat Harbor, Maui, Hawaii (POD) 1093 
Machias River, Maine (NED) 69 
Mackay Creek, N.C. (SAW) 238, 249, 254 
Mackinac Island Harbor, Mich. (NCE) 940 
Mackinaw City Harbor, Mich. (NCE) 940 
Macon, Ga. (SAS) 284 
Mad River, Calif. (SPN) 1036, 1041, 1046 
Mad River Lake, Conn. (NED) 28, 52, 74 
Madison, Nebr., Union and Taylor Creeks (MRO) 662 
Madison, Ohio River Basin, Ind. (ORL) 733, 727 
Magruder Drainage District, Oreg. (NPP) 1138, 1139, 1141 
Mahoning Creek Lake, Ohio River Basin, Pa. (ORP) 775, 787 
Maiden Creek Reservoir, Pa. (NAP) 152 
Main Branch Chisholm Creek, Wichita, Kans. (SWT) 604 
Main Ditch No. 6 near Hamburg, Iowa (MRO) 663 
Maintenance and repair fleet and marine terminals, Ark. (SWL) 
592, 598 
Maintenance and Repair Fleet and Marine Terminals, Okla. 
(SWT) 551, 553, 575 
Malalla River at Ressel location, Oreg. (NPP) 1142 
Malden River, Mass. (NED) 69 
Malheur Improvement District Snake River, Oreg. (NPW) 1191 
Malheur River, Oregon (NPW) 1190, 1189, 1191 
Mamoroneck Harbor, N.Y. (NAN) 124 
Manasquan River, N.J. (NAP) 135, 144 
Manatee River, Fla. (SAJ) 294, 308 
Manchester Harbor, Mass. (NED) 69 
Manchester, Ohio (ORH) 762, 756, 760 
Mandan, Heart River, N. Dak. (MRO) 662 
Manele Small Boat Harbor, Lanai, Hawaii (POD) 1093 
Manhasset Bay, N.Y. (NAN) 124 
Manhattan, Kansas River, Kansas (MRK) 636, 637, 638 
Maniece Bayou, Ark. (LMN) 403, 410, 422 
Manistee Harbor, Mich. (NCE) 907, 924, 931 
Manistique Harbor, Mich. (NCE) 907,924, 931 
Manitowoc Harbor, Wis. (NCC) 862, 874, 881,886 
Mankato and North Mankato, Minn. (NCS) 809, 815 
Manns Harbor, N. C. (SAW) 254 
Manokin River, Md. (NAB) 192 
Mansfield Hollow Lake, Conn. (NED) 43, 55, 77 
Mansfield Lake, Ind. (ORL) 699, 710, 720, 729 
Manteo (Shallowbag) Bay, N.C. (SAW) 229, 247 
Mantua Creek, N.J. (NAP) 150 
Mapleshade, Ohio (ORH) 762, 756 
Marblehead Harbor, Mass. (NED) 69 
Marietta, Ohio (ORH) 762, 756 
Marina del Rey, Los Angeles County, Calif. (SPL) 987, 1006 
Marion County Drainage District, Mo. (NCR) 839 
Marion, Ind. (ORL) 728 
Marion Lake, Grand (Neosho) River Basin, Kan. (SWT) 583, 594, 
602 
Markham Ferry Lake, Arkansas River Basin, Okla. (SWT) &/567/& 
Marmarth, N. Dak. (MRO) 662 
Marquette Harbor, Mich. (NCS) 820, 821 
Marsh Creek, Geneva, N.Y. (NCB) 977 
Marshall Ford Lake, Tex. (SWF) 526 
Marshall, Minn. (NCS) 823, 824 
Marshalltown, Iowa River, Iowa (NCR) 829, 834, 836 
Marshland Drainage District, Columbia County, Oreg. (NPP) 1139 
Martin, John Lake, Arkansas River, Colo. (SWA) 536, 544, 546 
Martin, Ky. (ORH) 742, 752, 762 
Martins Ferry, Ohio (ORP) 795, 798 
Martins Fork Lake, Ky. (ORN) 683, 688 
Martis Creek Reservoir, Martis Creek, Nev. and Calif. (SPK) 1064, 
1075 
Marysville Reservoir, Calif. (SPK) 1071, 1076 
Mason J. Niblack levee, Ohio River Basin, Ind. (Wabash River) 
(ORL) 699, 711, 733, 727 
Mason, W. Va. (ORH) 762, 756 
Massillon, Ohio (ORH) 742, 752, 756 
Matagorda Ship Channel, Tex. (SWG) 469, 478, 487, 497, 502 
Matawan Creek, N.J. (NAN) 124 
Matinicus Harbor, Maine (NED) 69 
Mats Mats Bay, Wash. (NPS) 1151, 1160, 1165 
Mattapoisett Harbor, Mass. (NED) 69 
Mattaponi River, Va. (NAO) 223 
Mattituck Harbor, N.Y. (NAN) 124 
Matunuck Beach, South Kingston, R.I. (NED) 72 
Mauckport, Ohio River Basin, Ind. (ORL) 733, 727 
Maumee River Above Toledo, Ohio (NCE) 940 
Maunalua Bay Small Boat Harbor, Oahu, Hawaii (POD) 1087, 
1090, 1092 
Maurice River, N.J. (NAP) 150 
Mayaguez Harbor, P.R. (SAJ) 320 
Maysville, Ky. (ORH) 762, 756 
McCook Lake, S. Dak. (MRO) 662 
McCook, Nebr. (MRK) 637 
McGee Creek Drainage and Levee District, Ill. (LMS) 461 
McGinnis levee, Ohio River Basin, Ind. (Wabash River Basin) 
(ORL) 733, 727 
McKees Rocks, Pa. (ORP) 795, 798 
McKenzie River near Walterville, Oreg. (NPP) 1142 
McKinney Bayou, Ark. (LMN) 422, 424 
McLean Bottom Levee District No. 3, Arkansas River, Ark. (SWL) 
571 
McNary Lock and Dam, Columbia River, Oregon & Wash. 
(NPW) 1184, 1188, 1196 
Meadow Grove, Nebr., Buffalo Creek (MRO) 663 
Medomak River, Maine (NED) 69 
Meherrin River, N.C. (NAO) 223 
Melbourne Harbor, Fla. (SAJ) 294, 308 
Mellen, Wis. (NCS) 823 
Melrose Reservoir, Va. (SAW) 255 
Melvern Lake, Osage (Marais des Cygnes) River, Kans. (MRK) 
615, 627, 636 
Memphis Harbor (MR&T) 1239, 1251 
Memphis, Wolf River, and Nonconnah Creek, Tenn. (LMM) 444 
Menemsha Creek, Martha's Vineyard, Mass. (NED) 10, 48 
Menominee Harbor and River, Mich. and Wis. (NCC) 863, 874, 
881, 886 
Meramec Park Lake, Mo. (LMS) 456, 459 
See page 1297 for District abbreviations. 1312

INDEX 
Meramec River Basin, Mo. (LMS) 459 
Merced County Stream Group, Calif. (SPK) 1064, 1075, 1080 
Merced River, Calif. (SPK) 1065, 1075 
Mercer Lake, Weldon River, Mo. (MRK) 638 
Mermentau River, Bayou Nezpique, and Bayou Des Cannes, La. 
(LMN) 391, 408 
Mermentau River, La. (LMN) 391, 408 
Merriam, Turkey Creek, Kans. (MRK) 616, 627, 636 
Merrimack River Basin, N.H. and Mass. (NED) 36, 76 
Merrimack River, Mass. (NED) 69 
Metamora Lake, Ohio River Basin, Ind. (Great Miami River) 
(ORL) 733, 729 
Methow River, Wash. (NPS) 1171 
Metlakatla Harbor, Alaska (NPA) 1212 
Metropolis, Ohio River Basin, Ill. (ORL) 733, 727 
Miami Harbor, Fla. (SAJ) 295, 308 
Miami, Okla. (Neosho River and Tar Creek) (SWT) 606 
Mianus River, Conn. (NED) 69 
Michigan City Harbor, Ind. (NCC) 863, 874, 881, 886 
Middle Beach, Conn. (NED) 72 
Middle Creek, Calif. (SPK) 1083 
Middle Fork of Mud River, W.Va. (ORH) 742, 752 
Middle Gila River Channel Improvements, Upper End of Safford 
Valley to Buttes Reservoir Site (Camelsback Reservoir Site to 
Salt River), Ariz. (SPL) 996, 1008 
Middle River and Connecting Channels, Calif. (SPK) 1080 
Middle River and Dark Head Creek, Md. (NAB) 192 
Middleport, Ohio (ORH) 762, 756, 760 
Middlesboro, Cumberland River Basin, Ky. (ORN) OG 684, 688, 
697 
Middlesboro (Yellow Creek), Ky. (ORN) 696 
Middleton Shoals Reservoir, Ga. and S.C. (SAS) 284 
Midland Drainage District, Oreg. (NPP) 1113, 1126, 1138, 1139 
Milan, Ill. (NCR) 839 
Miles City, Mont. (MRO) 662 
Milford Harbor, Conn. (NED) 69 
Milford Haven, Va. (NAO) 223 
Milford Lake, Republican River, Kans. (MRK) 616, 627, 636 
Milk River, Malta, Mont. (MRO) 663 
Milk River, Nashua, Mont. (MRO) 663 
Mill Creek and South Slough at Milan, Ill. (NCR) 826, 833, 836 
Mill Creek, Jefferson County, Ky. (ORL) 699, 711, 720, 729 
Mill Creek Lake, Ohio (ORL) 743, 752 
Mill Creek Lake, Washington (NPW) 1178, 1187 
Mill Creek, Md. (NAB) 192 
Mill Creek, N.C. (SAW) 239, 249 
Mill Creek, Tex. (SWG) 492 
Mill Creek, Va. (NAO) 223 
Mill Creek, Wash. (NPW) 1190 
Mill Four Drainage District, Yaquina River, Oreg. (NPP) 1142 
Miller, Ohio (ORH) 762, 756 
Millers Ferry lock and dam, Ala. (SAM) 350, 360 
Millersburg, Ohio (ORH) 763, 758 
Millican Lake, Navasota River, Texas (SWF) 527, 530 
Millwood Lake, Red River Basin, Ark. (SWT) 583, 594, 602, 603 
Millwood, W.Va. (ORH) 762, 756 
Milton-Freewater, Walla Walla River, Oregon (NPW) 1191 
Milton Harbor, N.Y. (NAN) 124 
Milton, Ohio River Basin, Ill. (ORL) 733 
Milton, Ohio River Basin, Ky. (ORL) 733, 727 
Milwaukee Harbor, Wis. (NCC) 864, 875, 882, 886 
Mingo Creek, S.C. (SAN) 272 
Mingo Junction, Ohio (ORP) 795, 798 
Mining City Lake, Ohio River Basin, Ky. (Green River) (ORL) 
733, 729 
Minnesota, Minn. (NCS) 823 
See page 1297 for District abbreviations. 
Minnesota River, Minn. (NCS) 804, 814, 817 
Mispillion River, Del. (NAP) 150 
Misquamicut Beach, Westerly, R.I. (NED) 72 
Mission and Lapwai Creeks, Idaho (NPW) 1189, 1191 
Mission Creek at Cashmere, Wash. (NPS) 1171 
Mississinewa Lake, Ind. (ORL) 699, 711, 720 
Mississippi and Leech Rivers, Minn. (NCS) 821 
Mississippi River Agr Area No. 8, Mo. (LMS) 461 
Mississippi River Agr Area No. 10, Mo. (LMS) 461 
Mississippi River Agr Area No. 12, Mo. (LMS) 461 
Mississippi River, Alton to Gale, Ind. (LMS) 461 
Mississippi River and Alluvial Valley below Cape Girardeau, Mo. 
(MR&T) 1220 
Mississippi River at St. Louis, Mo. (LMS) 457 
Mississippi River Bank Revetments & Dikes (MR&T) 1240, 1242, 
1244, 1245 
Mississippi River, Baton Rouge to Gulf of Mexico, La. (LMN) 392, 
408 
Mississippi River between Brainerd and Grand Rapids, Minn. 
(NCS) 821 
Mississippi River between Missouri River and Minneapolis, Minn. 
804, 826, 843, 846 
Mississippi River between Ohio and Missouri Rivers (LMS) 456 
Mississippi River - Channel Improvements (MR&T) 1222, 1228, 
1239, 1253, 1254, 1256 
Mississippi River Commission (MR&T) 219 
Mississippi River Delta at and below New Orleans, La. (New 
Orleans to Venice, La. Hurricane Protection) (LMN) 404, 410 
Mississippi River-Gulf Outlet, La. (LMN) 394, 408 
Mississippi River-Gulf Outlet, Michoud Canal, La. (LMN) 395, 
408 
Mississippi River Levees (MR&T) 1222, 1250, 1252, 1249, 1247 
Mississippi River near Aitkin, Minn. (NCS) 823 
Mississippi River Outlets, vicinity of Venice, La. (LMN) 421 
Mississippi River Tributaries (MR&T) 1252, 1262 
Mississippi River Tributary and Outlet Improvements (MR&T) 
1229 
Mississquoi River at Richford, Vt. (NAN) 126 
Missouri River at Fort Peck, Mont. (MRO) 653 
Missouri River at New Haven; Mo. (MRK) 638 
Missouri River at New Haven, Mo. (MRK) 638 
Missouri River, Aten, Nebr. (MRO) 662 
Missouri River Basin (Kansas City District) (MRK) 617, 628, 630 
Missouri River Basin (Omaha Dist.) (MRO) 646, 656, 659 
Missouri River, Garrison Dam to Oahe Lake, N. Dak. (MRO) 646, 
654, 659 
Missouri River, Kenslers Bend, Nebr. to Sioux City, Iowa (MRO) 
646, 654 
Missouri River Levee System, Iowa, Nebraska, Kansas and Mo. 
(Rulo, Nebr. to mouth) (NRK) 617, 627, 635, 636, 630, 637 
Missouri River Levee System, Sioux City, Iowa to Mouth (Sioux 
City, Iowa to Rulo, Neb.) (MRO) 647, 653, 656, 657, 654, 659 
Missouri River, Mo. (MR&T) 1234 
Missouri River, Niobrara, Nebr. (MRO) 662 
Missouri River, Sioux City, Iowa, to Fort Benton, Mont. (MRO) 
658 
Missouri River, Sioux City Iowa, to mouth (Rulo, Nebr., to mouth) 
(MRK) 608, 626, 629, 636, 630, 632, 633, 634 
Missouri River, Sioux City, Iowa to Rulo Nebr. (MRO) 640 
Mobile Harbor, Ala. (SAM) 341, 358, 372 
Moccasin Springs, Mo. (LMS) 460 
Moccasin Swamp, N.C. (SAW) 239, 249 
Mojave River Basin, Calif. (SPL) 1000, 1008 
Mojave River Reservoir (SPL) 1000, 1008 
Mokelumne River, Calif. (SPK) 1080 
Molalla River at Milk Creek location, Oreg. (NPP) 1142 
1313 
455-506 0 - 72 - 2

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Moline Harbor, Ill. (NCD) 849 
Monongahela River, Pa. and W. Va. (ORP) 767, 786, 790, 793, 794 
Monoosnoc Brook, Mass. (NED) 76, 78 
Monoosnoc Reservoir, Mass. (NED) 76, 78 
Monroe Bay and Creek, Va. (NAB) 192 
Monroe Floodwall, La. (LMK) 430, 432, 436 
Monroe Harbor, Mich. (NCE) 907, 924, 932 
Monroe Lake, Ind. (ORL) 699, 711, 720, 729 
Monterey Harbor, Calif. (SPN) 1027, 1040, 1043 
Montour Falls, Oswego River Basin, N.Y. (NCB) 977 
Moorefield, W. Va. (NAB) 198 
Moores Ferry, Va. (ORH) 763, 758 
Mooringsport Reservoir, La., and Tex. (LMN) 418 
Moosabec Bar, Maine (NED) 69 
Morehead City Harbor, N.C. (SAW) 229, 247 
Morehead, Triplett Creek, Ky. (ORL) 699, 712, 720 
Morgan City and vicinity, La. (hurricane protection) (LMN) 404, 
410 
Moriches Inlet, N.Y. (NAN) 88, 113 
Mormon Slough, Calaveras River, Calif. (SPK) 1065, 1075 
Morrison, Bear Creek, Colo. (MRO) 662 
Morristown Harbor, N.Y. (NCB) 976 
Morro Bay Harbor, Calif. (SPL) 988, 1006 
Moscow, Ohio River Basin, Ohio (ORL) 733, 727 
Mosquito Creek Lake, Ohio River Basin, Ohio (ORP) 776, 787 
Moss Landing Harbor, Calif. (SPN) 1047 
Mott, N. Dak. (MRO) 662 
Mounds and Mound City, Ohio River Basin, Ill. (LMM) 444 
Moundsville, W. Va. (ORP) 795, 798 
Mount Clements, Clinton River, Mich. (NCE) 941 
Mountain Brook Reservoir, N.H. (NED) 76, 78 
Mouth of Delaware River (MRK) 637 
Mouth of Sangamon River, Ill. (NCC) 870, 876 
Mouth of Yazoo River, Miss. (LMK) 435 
Moyock C:eek, N.C. (SAW) 239, 249 
Mt. Carmel, Ill. (ORL) 699, 712, 720, 730 
Mt. Holly, N.J. (NAP) 152 
Mt. Morris Reservoir, N.Y., Genesee River (NCB) 961,966 
Mud & Baskett Slough, Rickreall Creek, Oreg. (NPP) 1141 
Mud Creek, Broken Bow, Nebr. (MRO) 647, 654 
Mud Creek, Idabel, Okla. (SWT) 604 
Mud Lake Area, Idaho (NPW) 1190 
Mud Mountain Dam and Reservoir, White River, Wash. (NPS) 
1154, 1161, 1166 
Mud River, W. Va. (ORH) 763, 758 
Muddy Creek Dam, Pa. (ORP) 776, 787 
Muddy Hook and Tyler Coves, Md. (NAB) 192 
Mulberry Creek, Va. (NAO) 223 
Mule Slough, Payne Junction, Iowa (MRO) 663 
Mullet Key, Fla. (SAJ) 322 
Multnomah Channel, Oreg. (NPP) 1134 
Multnomah County Drainage District 1, Oreg. (NPP) 1138, 1139, 
1141 
Muncie, White River, Ind. (ORL) 733, 730 
Murderkill River, Del. (NAP) 150 
Murfreesboro Dam and Lake (LMK) 436 
Murfreesboro, Tenn. (ORN) 697 
Murray Lock and Dam (No. 7) Ark. (SWL) 551, 553, 565 
Murray lock and dam No. 7, Ark. (SWL) 553, 561 
Muscatatuck River, Ind. (ORL) 730 
Muscatine Harbor, Iowa (NCD) 849 
Muscatine Island Levee District and Muscatine-Louisa County 
Drainage District No. 13, Iowa (NCR) 829, 834, 837 
Muskegon Harbor, Mich. (NCE) 908, 924, 932 
Muskingum River Dams & Lakes, Ohio (ORH) 743, 752, 758 
Muskingum River, Ohio (ORH) 755 
Mustinka River, Minn. (NCS) 820 
Myers Chuck Harbor, Alaska (NPA) 1202, 1208, 1210 
Mystic, Conn. (NED) 78 
Mystic River, Conn. (NED) 69 
Mystic River, Mass. (NED) 69 
N 
Naknek River, Alaska (NPA) 1212 
Nan Cove, Md. (NAB) 192 
Nandua Creek, Va. (NAO) 223 
Nansemond River, Va. (NAO) 223 
Nanticoke River (including Northwest Fork), Del. and Md. (NAB) 
192 
Nanticoke River, Md. (NAB) 160, 181, 192 
Nantucket (Harbor of Refuge), Mass. (NED) 69 
Napa River Basin, Calif. (SPN) 1037, 1041, 1046, 1047 
Napatree Beach, Conn. (NED) 72 
Narragansett Pier, R.I. (NED) 72, 78 
Narragaugus River, Maine (NED) 69 
Narrows of Lake Champlain, N.Y. and Vt. (NAN) 89, 113 
Nashua, N.H. (NED) 76, 78 
Natchez Port area, Miss. (LMK) 436 
Natchitoches Parish, La. (LMN) 423, 424 
Navajo Reservoir, N. Mex. (SPK) 1080 
Navarro lls Lake, Tex. (SWF) 515, 523, 526, 529 
Navasota bake, Tex. (SWF) 527, 530 
Nawiliwili Harbor, Kauai, Hawaii (POD) 1093 
Neabsco Creek, Va. (NAB) 192 
Neah Bay, Wash. (NPS) 1169, 1170 
Neale Sound, Md. (NAB) 192 
Near Dardanelle, Arkansas River, Ark. (SWL) 571 
Neavitt Harbor, Md. (NAB) 192 
Neches and Angelina Rivers, Tex. (SWF) 506, 531 
Needles, San Bernardino County, Calif. (SPL) 1009, 1001 
Nehalem Bay, Oreg. (NPP) 1134 
Nehalem River, Vicinity of Nehalem, Oreg. (NPP) 1142 
Neodesha Lake, Kansas (SWT) 567, 600, 605 
Neon-Fleming, Kentucky River, Ky. (ORL) 733, 730 
Neshaminy State Park Harbor, Pa. (NAP) 150 
Neuse River Barrier, N.C. (SAW) 256 
Neuse River Basin, N.C. (SAW) 240, 255 
Neuse River, N.C. (SAW) 230, 248, 254 
Neva Strait, Alaska (NPA) 1212 
Neville Island, Pa. (ORP) 795, 798 
New Albany Ohio River Basin, Ind. (ORL) 733, 727, 730 
New Amsterdam, Ohio River Basin, Ind. (ORL) 733, 727 
New Bedford and Fairhaven Harbor, Mass. (NED) 69 
New Bedford, Fairhaven and Acushnet, Mass. (NED) 40, 55 
New Boston Harbor, Ill. (NCD) 849 
New Buffalo Harbor, Mich. (NCC) 865, 875 
New Bullards Bar Reservoir, Calif. (SPK) 1065, 1075 
New Cumberland, W. Va. (ORP) 795, 798 
New Harbor, Maine (NED) 70 
New Harmony Bridge, Indiana (ORL) 733, 727, 731 
New Harmony, Ohio River Basin, Ind. (Wabash River) (ORL) 
733, 727 
New Hartford, Iowa (NCR) 839 
New Haven Breakwater, Conn. (NED) 70 
New Haven Harbor, Conn. (NED) 11, 48 
New Haven, Mo. and mouth of Osage Diversion Levee (MRK) 637 
New Hope Lake, N.C. (SAW) 235, 248, 255 
New Jersey Intracoastal Waterway (NAP) 136, 144 
New Kensington and Parnassus, Pa. (ORP) 795, 798 
New London, Conn. (NED) 40, 55 
New London Harbor, Conn. (NED) 70 
New Madrid Harbor, Mo. (LMM) 442 
See page 1297 for District abbreviations. 1314

INDEX 
New Martinsville, W. Va. (ORH) 762, 756 
New Matamoras, Ohio (ORH) 763, 756 
New Melones Reservoir, Calif. (SPK) 1072 
New Pass, Sarasota, Fla. (SAJ) 320 
New Richmond, Ohio River Basin, Ohio (ORL) 733, 727 
New River, Fla. (SAJ) 320 
New River, Onslow County, N.C. (SAW) 241, 249, 256 
New River, Va. and W. Va. (ORH) 755 
New Rochelle Harbor, N.Y. (NAN) 124 
New York Harbor - collection and removal of draft (NAN) 91, 113 
New York Harbor - entrance channels & anchorage areas (NAN) 
92, 113 
New York Harbor - prevention of obstructive and injurious deposits 
(NAN) 95, 114, 124 
New York & New Jersey Channels (NAN) 91, 113, 124 
Newark Bay, Hackensack and Passaic Rivers, N.J. (NAN) 89, 113 
Newark, Ohio (ORH) 744, 752, 756 
Newbegun Creek, N.C. (SAW) 254 
Newburgh, Ind, (ORL) 731 
Newburyport Harbor, Mass. (NED) 11,49 
Newmarket Creek, Va. (NAO) 213, 217 
Newport Bay Harbor, Calif. (SPL) 1013 
Newport News Creek, Va. (NAO) 223 
Newport, Ohio (ORH) 763, 756 
Newport, Ohio River Basin, Ky. (ORL) 733, 727,730 
Newport, White River, Ark. (SWL) 571 
Newry-Old Pickens, S.C. (SAS) 284 
Newt Graham Lock and Dam (No. 18), Okla. (SWT) 575, 600 
Newton Creek, N.Y. (NAN) 124 
Newton Creek, Woodlynne, N.J. (NAP) 152 
Niagara Remedial Works, N.Y. (NCB) 976 
Niagara River, N. Y. (NCB) 976 
Niantic Bay and Harbor, Conn. (NED) 12, 49 
Niblack, Mason J., Levee, Ohio River Basin, Ind. (Wabash River) 
(ORL) 699, 711, 733, 727, 730 
Nichols, N.Y. (NAB) 174, 175 
Nimrod Lake, Ark. (SWL) 551, 555, 562, 567 
Ninilchik Harbor, Alaska (NPA) 1202, 1208, 1210 
Nisnabotna River at Hamburg, Iowa (MRO) 662 
Nixon Creek, Tenn. (LMM) 444 
Nolin River Lake, Ky. (ORL) 699, 712, 720, 729 
Nome Harbor, Alaska (NPA) 1203, 1208, 1210 
Nomini Bay and Creek, Va. (NAB) 192 
Nookagee Lake, Mass. (NED) 39, 55, 76 
Nooksack River near Marietta, Wash. (NPS) 1172 
Norfolk Harbor, Va. (NAO) 204 
Norfolk Lake, Ark. (SWL) 551, 559, 562, 570 
Norfolk Local Protection, Elkhorn River Basin, Nebr. (MRO) 654 
Norfolk, Nebr. (MRO) 647 
Norfolk, Va. (Local Flood Protection) (NAO) 213, 217 
Normal, Ky. (ORH) 763, 756 
Norman Dam and Lake, Little River, Okla. (SWT) 604 
Norrell Lock and Dam (No. 1) and Entrance Channel, Ark. (SWL) 
551,554, 565 
Norrell Lock and dam No. 1 and entrance channel, Ark. (SWL) 
554, 561 
North Adams, Hoosic River Basin, Mass. (NAN) 126 
North Alexander Drainage and Levee District, Ill. (LMS) 461 
North Andover and Lawrence, Mass. (NED) 76, 78 
North Branch of Kokosing Lake, Ohio (ORH) 744, 752 
North Central Lakes 979 
North Ellenville, N.Y. (NAN) 114 
North Fork of Pound Lake, Va. (ORL) 744, 752 
North Fork, Pit River, at Alturas, Calif. (SPK) 1066, 1075 
North Hampton Beach, North Hampton, N.H. (NED) 72 
North Hartland Lake, Vt. (NED) 29, 52, 74 
North Little Rock, Arkansas River, Ark. (SWL) 571 
North Nashua, Mass. (NED) 78 
North Nashua River, Mass. (NED) 76 
North River Dike, N.C. (SAW) 256 
North Scituate Beach, Scituate, Mass. (NED) 72 
North Springfield Lake, Vt. (NED) 29, 52, 74 
North Wildwood, N.J. (NAP) 151 
Northampton, Mass. (NED) 74, 78 
Northeast (Cape Fear) River, N.C. (SAW) 254, 256 
Northeast Harbor, Maine (NED) 70 
Northeast River, Md. (NAB) 192 
Northfield Brook Lake, Conn. (NED) 36, 54, 75 
Northport Harbor, N.Y. (NAN) 124 
Norwalk, Conn. (NED) 78 
Norwalk Harbor, Conn. (NED) 12, 49 
Norwalk-Wilton, Conn. (NED) 78 
Norwich, Conn. (NED) 77, 78 
Noxubee River, Miss. (SAM) 374 
Noyo River and Harbor, Calif. (SPN) 1027, 1040, 1043 
O 
Oahe Reservoir, Missouri River Basin, S. Dak. and N. Dak. 
(MRO) 652, 655, 659 
Oak Bluffs Town Beach, Martha's Vineyard, Mass. (NED) 21, 51 
Oak Orchard Harbor, N.Y. (NCB) 954, 964 
Oakdale, Pa. (ORP) 798 
Oakland Harbor, Calif. (SPN) 1028, 1040, 1043 
Oakley Lake and channel improvements, Ill. (NCC) 870, 876 
Obey River, Tenn. (ORN) 695 
Obion River, Tenn. (LMM) 443 
Obion River, Tenn. (MR&T) 1226 
Occohannock Creek, Va. (NAO) 223 
Occoquan Creek, Va. (NAB) 192 
Ocean Beach, San Diego County, Calif. (SPL) 1014 
Ocean City Harbor and Inlet and Sinepuxent Bay, Md. (NAB) 160, 
181 
Ocean City, N.J. (NAP) 151 
Oceanside Harbor, Calif. (SPL) 988, 1006 
Oceanside, San Diego County, Calif. (SPL) 1014 
Ochlockonee (Ochlockney) River, Ga. and Fla. (SAM) 374 
Oconto Harbor, Wis. (NCC) 865, 875, 882, 887 
Ocracoke Inlet, N.C. (SAW) 241, 248 
Ocracoke Island, N.C. (SAW) 230, 250 
Ogdensburg Harbor, N.Y. (NCB) 954, 964, 973 
Ohio River Basin (Huntington District) (ORH) 745, 753, 759, 758, 
760 
Ohio River Basin (Louisville Dist.) (ORL) 699, 712, 720, 723 
Ohio River Basin (Nashville Dist.) (ORN) 684, 690, 696 
Ohio River Basin (Pittsburgh District) (ORP) 777, 787, 791, 796 
Ohio River, Construction of locks and dams on (ORD) 699, 700, 
736, 667, 671, 672, 766 
Ohio River, Ill. and Ky. (MR&T) 1234, 1245 
Ohio River, Open-channel work (ORD) 699, 701, 669, 671, 675, 
768 
Oil City, Pa. (ORP) 798 
Okabena Creek at Worthington, Minn. (NCR) 839 
Okanogan River, Wash. (NPS) 1171 
Okatibbee Reservoir, Miss. (SAM) 347,360 
Okeechobee Waterway, Fla. (SAJ) 296, 308 
Oklahoma City Floodway, Okla. (SWT) 603, 605 
Oklawha River, Fla. (SAJ) 297, 308 
Olcott Harbor, N.Y. (NCB) 976 
Old Harbor, Kodiak Island, Alaska (NPA) 1212 
Old Hickory lock and dam, Tenn. (ORN) 697 
Old River, Calif. (SPK) 1051, 1074 
See page 1297 for District abbreviations. 1315

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Old River, La. (MR&T) 1224, 1240 
Old Town Creek, Miss. (SAM) 374 
Oldmans Creek, N.J. (NAP) 150 
Olean, N.Y. (ORP) 795, 798 
Olympia Harbor, Wash. (NPS) 1169, 1170 
Omaha, Nebr. (MRO) 659, 662 
Onaga Lake, Kansas River, Kansas (MRK) 617, 628 
Onancock River, Va. (NAO) 223 
Onondaga Creek, Nedrow, N.Y. (NCB) 977 
Ontonagon Harbor, Mich. (NCS) 804, 814, 818 
Oologah Lake, Arkansas River Basin, Okla. (SWT) 567, 583, 594, 
598, 600, 602 
Oostanuala and Coosawatee Rivers, Ga. (SAM) 374 
Optima Lake, North Canadian River, Okla. (SWT) 584, 594, 598 
Orange Reservoir, N.C. (SAW) 255 
Orange River, Fla. (SAJ) 320 
Oregon Slough (North Portland Harbor), Oreg. (NPP) 1134 
Orleans, Ind. (ORL) 699, 713, 720 
Oro Grande Wash channel improvements (SPL) 1001 
Oroville Reservoir, Calif. (SPK) 1066, 1076 
Orowoc Creek, N.Y. (NAN) 124 
Orwell Reservoir (Otter Tail River), Minn. (NCS) 820 
Osage River, Mo. (MRK) 634 
Osawatomie, Kans. (MRK) 637 
Osawatomie, Osage (Marais des Cygnes) River, Kansas (MRK) 
636 
Osawatomie, Pottawatomie Creek, Kans. (MRK) 628, 618 
Oslo, Minn., Red River of the North (NCS) 823 
Oswego Harbor, N. Y. (NCB) 954, 964, 973 
Ottawa, Ohio (NCE) 941 
Ottawa, Osage (Marais des Cygnes) River, Kansas (MRK) 636, 
637,638 
Otter Brook Lake, N.H. (NED) 29, 53, 74 
Otter Creek, Vt. (NAN) 124 
Otter Tail River, Minn. (NCS) 820 
Ouachita & Black Rivers below Camden, Ark. (LMK) 427, 432 
Ouachita River and tributaries, Ark. and La. (LMK) 429, 434, 436 
Ouachita River (MR&T) 1252 
Overton-Red River Waterway, La. (LMN) 395, 408 
Owasco Inlet & Outlet, Montville & Dry Creek, State Ditch & 
Crane Brook, N.Y. (NCB) 977 
Owensboro, Ohio River Basin, Ky. (ORL) 733, 727 
Owls Head Harbor, Maine (NED) 70 
Oxford, N.Y. (NAB) 166, 170, 182, 195, 196 
Oyster Channel, Va. (NAO) 224 
Oyster Creek, Tex. (SWG) 491 
Ozan Creek, Ark. (LMK) 436 
Ozark lock and dam (No. 12), Ark. (SWL) 551, 559, 563, 565 
Ozona, Fla., channel and turning basin (SAJ) 320 
p 
Pacific County, Diking Improvement District 1, Wash. (NPP) 1139 
Paducah, Ohio River Basin, Ky. (ORL) 733, 727, 730 
Pagan River, Va. (NAO) 224 
Paint Creek Lake, Ohio River Basin, Ohio (ORL) 745, 753, 758 
Paint Rock River, Ala. (ORN) 696 
Painted Post, N. Y. (NAB) 171, 195, 196 
Painted Rock Reservoir, Gila River, Ariz. (SPL) 997 
Paintsville Lake, Ky. (ORL) 745, 753 
Pajaro River, Calif. (SPN) 1037, 1041, 1046 
Palm Beach County, Fla. from Martin County Line to Lake Worth 
Inlet and from South Lake Worth Inlet to Broward County Line 
(SAJ) 322 
Palm Beach County from Lake Worth Inlet to South Lake Worth 
Inlet, Fla. (SAJ) 301, 309 
Palm Beach, Fla., side channel and basin (SAJ) 320 
Palm Beach Harbor, Fla. (SAJ) 297, 308 
Palouse River, Wash. (NPW) 1190, 1189 
Pamlico and Tar Rivers, N. C. (SAW) 254 
Pamunkey River, Va. (NAO) 224 
Panacea Harbor, Fla. (SAM) 374 
Panama City Harbor, Fla. (SAM) 341, 359, 372 
Pantego Creek and Cucklers Creek, N. C. (SAW) 256 
Panther Creek, Ky. (ORL) 699, 713, 720, 730 
Panther Creek, W. Va. (ORH) 763 
Papillion Creek and Tributaries, Nebr. (MRO) 648, 654 
Parish Creek, Md. (NAB) 193 
Park River, Conn. (NED) 75, 78 
Parker Creek, Va. (NAO) 224 
Parkersburg, W. Va. (ORH) 763, 756 
Parrots Creek, Va. (NAO) 224 
Pascagoula Harbor, Miss. (SAM) 342, 359 
Pascagoula River, Miss. (SAM) 374 
Pasquotank River, N. C. (SAW) 256 
Pass-A-Grille Pass, Fla. (SAJ) 320 
Pass Christian Harbor, Miss. (SAM) 342, 359 
Pass Manchac, La. (LMN) 421 
Passamaquoddy Tidal Power Project, Maine (NED) 70 
Pat Mayse Lake, Red River Basin, Tex. (SWT) 584, 594, 598, 602 
Patchogue River, Conn. (NED) 70 
Patoka Lake, Ind. (ORL) 699, 713, 721 
Patriot, Ohio River Basin, Ind. (ORL) 733, 727 
Pattonsburg Lake, Grand River, Mo. (MRK) 618, 628 
Patuxent River, Md. (NAB) 193 
Pawcatuck, Conn. (NED) 78 
Pawcatuck River, R.I. and Conn. (NED) 70 
Pawtucket, R.I. (NED) 73, 78 
Pawtuxet Cove, R.I. (NED) 70 
Payette Valley, Idaho (NPW) 1190 
Peacock Creek, Liberty County, Ga. (SAS) 279, 282 
Pearl River, Miss., and La., Jackson, Miss. (SAM) 375 
Pearl River, Miss., and La. (SAM) 343, 359, 372 
Pearl River, Miss., Edinburg to Jackson (SAM) 374 
Pecan Bayou Lake, Pecan Bayou, Texas (SWF) 530 
Pecatonica River at Darlington, Wis. (NCR) 839, 841 
Peconic River, N. Y. (NAN) 124 
Pecos, Texas, flood control project (SWA) 549 
Peekskill Harbor, N. Y. (NAN) 124 
Pelican Harbor, Alaska (NPA) 1212 
Pembina River, N. Dak. (NCS) 823 
Pembina River Reservoir, N. Dak. (NCS) 823 
Pembroke Creek, N. C. (SAW) 254 
Pendleton, Umatilla River, Ore. (NPW) 1191 
Peninsula Drainage District 1, Oreg. (NPP) 1138, 1139, 1141 
Peninsula Drainage District 2, Oreg. (NPP) 1138, 1139, 1141 
Penny Slough, Rock River, Illinois (NCR) 839 
Penobscot River, Maine (NED) 70 
Pensacola Harbor, Fla. (SAM) 343, 359 
Pensacola Lake, Arkansas River Basin, Okla. (SWT) 567, 589, 595, 
600, 602, 604 
Pensaukee Harbor, Wis. (NCC) 893 
Pentwater Harbor, Mich. (NCE) 908, 924, 932 
Peoria, Ill. (NCC) 871, 876 
Pepin Harbor, Wis. (NCD) 849 
Pepper Creek, Del. (NAP) 150 
Pepperell Cove, Maine (NED) 70 
Perdido Pass, Ala. (SAM) 344 
Perdido Pass Channel, Ala. (SAM) 359 
Permament International Association of Navigational Congresses 
1275 
Perquimans River, N. C. (SAW) 254, 256 
See page 1297 for District abbreviations. 1316

INDEX 
Perry County Drainage and Levee Districts Nos. 1, 2, and 3, Mo. 
(LMS) 461 
Perry Lake, Delaware River, Kans. (MRK) 618, 628, 636 
Perth Amboy, N.J. (NAN) 125 
Petaluma River, Calif. (SPN) 1047 
Petersburg Harbor, Alaska (NPA) 1212 
Peterson, Minn., Root River (NCS) 823 
Petit-Anse, Tigre, and Carlin Bayous, La. (LMN) 396, 408 
Petit Jean River, Ark. (SWL) 571 
Petoskey, Mich. (NCE) 939, 940 
Phillippi Creek Basin, Fla. (SAJ) 327 
Phillips Reservoir, Mass. (NED) 76, 78 
Philpott Lake, Va. (SAW) 245, 250, 255 
Phoenix, Ariz., and Vicinity (including New River) (SPL) 997 
Pierce, Nebr. (MRO) 662 
Pig Island Gut, Maine (NED) 70 
Pilot Rock, Birch Creek, Ore. (NPW) 1191 
Pine and Mathews Canyons Reservoirs, Colorado River Basin, Nev. 
(SPL) 1001, 1009 
Pine Bluff, Ark., local protection (LMK) 436 
Pine Creek, Angle Inlet, Minn. (NCS) 821 
Pine Creek Lake, Red River Basin, Okla. (SWT) 584, 594, 598, 
602, 603 
Pine Creek, Orondo, Wash. (NPS) 1172 
Pine Flat Reservoir and Kings River, Calif. (SPK) 1067, 1076 
Pine Ford Reservoir, Mo. (LMS) 459 
Pine Mountain Lake, Ark. (SWL) 551, 556, 562 
Pine River Reservoir, Minn. (NCS) 819 
Pine River, St. Clair City, Mich. (NCE) 939, 940 
Pinellas County, Fla. (SAJ) 301, 309 
Pineville, Ky. (ORN) 696 
Pineville, Red River, La. (LMN) 423, 424 
Pinole Creek, Calif. (SPN) 1049 
Pinon Canon Dam, Trinidad, Colo. (SWA) 549 
Pioneer Lake, Arikaree River, Colo. and Kans. (MRK) 636, 638 
Pipestem Dam and Lake, N. Dak. (MRO) 648, 654 
Pithlachascotee River, Fla. (SAJ) 297, 308 
Pittsburgh Harbor, Pa. (ORP) 794 
Pittsburgh, Pa. (Golden Triangle) (ORP) 795, 798 
Pittsburgh, Pa. (North Side) (ORP) 795, 799 
Pittsburgh, Pa. (the Strip) (ORP) 795, 799 
Platte River - Easton - Saxon Bridge Protection (MRK) 637 
Platte River, Mo., Channel Improvement (MRK) 619, 628 
Platte River near Schuyler, Nebr. (MRO) 662 
Plattsburgh Harbor, N. Y. (NAN) 124 
Pleasant River, Maine (NED) 70 
Pleasanton Floodway, Tex. (SWF) 531 
Pleasantville, Egg Harbor Township, N. J. (NAP) 152 
Plum Creek, Ky. (ORL) 730 
Plum Creek, Tex. (SWT) 605 
Plymouth Harbor, Mass. (NED) 13, 49 
Plymouth, Pa. (NAB) 198 
Poca, W. Va. (ORH) 763, 758 
Pocomoke River, Md. (NAB) 161, 181 
PointJudith, R. I. (NED) 78 
Point Lockout Harbor, (Au Gres River) Mich. (NCE) 908, 925, 932 
Point Pleasant, W. Va. (ORH) 763, 756 
Pokegama Reservoir, Minn. (NCS) 819 
Polecat Creek, Okla. (Heyburn Reservoir & Channel Improvement) 
(SWT) 585, 594, 602, 603 
Pollack Rip Shoals, Nantucket Sound, Mass. (NED) 70 
Poison Bay, Flathead Lake, Mont. (NPS) 1170 
Pomeroy, Ohio (ORH) 756 
Pomme de Terre Lake, Pomme de Terre River, Mo. (MRK) 619, 
628, 636 
Pomona Lake, One Hundred Ten Mile Creek, Kans. (MRK) 619, 
628, 636 
Ponce De Leon Inlet, Fla. (SAJ) 298, 309 
Ponce Harbor, P. R. (SAJ) 298, 309 
Pontiac diversion, Rhode Island (NED) 78 
Port Alexander, Alaska (NPA) 1212 
Port Allen Harbor, Kauai, Hawaii (POD) 1093 
Port Angeles Harbor, Wash. (NPS) 1169, 1170 
Port Arthur and Vicinity, Tex., Hurricane - Flood Protection 
(SWF) 474, 479, 490 
Port Austin, Mich. (NCE) 939, 940 
Port Bay, N. Y. (NCB) 976 
Port Chester Harbor, N. Y. (NAN) 124 
Port Clinton Harbor, Ohio (NCE) 909, 925, 932 
Port Everglades Harbor, Fla. (SAJ) 320 
Port Gamble Harbor, Wash. (NPS) 1169, 1170 
Port Henry Harbor, N. Y. (NAN) 124 
Port Hueneme, Calif. (SPL) 989, 1006 
Port Jefferson Harbor, N. Y. (NAN) 124 
Port Ontario, Harbor, N.Y. (NCB) 976 
Port Orchard Bay, Wash. (NPS) 1169, 1170 
Port Orford, Oreg. (NPP) 1134 
Port Royal Harbor, S.C. (SAN) 262, 267 
Port San Luis, Calif. (SPL) 989, 1006 
Port Sanilac, Mich. (NCE) 909, 925, 932 
Port St. Joe Harbor, Fla. (SAM) 344, 359 
Port Townsend, Wash. (NPS) 1169, 1170 
Port Washington Harbor, Wis. (NCC) 866, 875, 882, 887 
Port Wing Harbor, Wis. (NCS) 820, 821 
Portage Lake, Mich. (NCE) 939, 940 
Portage, Pa. (ORP) 799 
Portland Harbor, Maine (NED) 13, 49 
Portland, Ohio (ORH) 763, 756 
Portland, Salamonie River, Ind. (ORL) 733, 731 
Portneuf River and Marsh Creek, Columbia River Basin, Idaho 
(NPW) 1190, 1191 
Portneuf River, Lava Hot Springs, Idaho (NPW) 1178, 1187 
Portsmouth Harbor and Piscataqua River, Maine and N. H. 
(NED) 14, 49 
Portsmouth Harbor, Va., Channel to Nansemond Ordinance Depot 
(NAO) 224 
Portsmouth-New Boston, Ohio (ORH) 763, 756 
Portville, N.Y. (ORP) 795, 799 
Posten Bayou, Ark., and La. (LMN) 422, 424 
Poteet Channel Improvement, Tex. (SWF) 531 
Potomac and Anacostia Rivers, D.C., Collection and Removal of 
Drift (NAB) 161, 181 
Potomac River and Lower Cedar Point, Md. (NAB) 193 
Potomac River and Tributaries at and below Washington, D.C., 
Elimination of Waterchestnut (NAB) 162, 181 
Potomac River at Alexandria, Va. (NAB) 193 
Potomac River at Mount Vernon, Va. (NAB) 193 
Potomac River below Washington, D.C. (NAB) 193 
Potomac River North Side of Washington Channel, D.C. (NAB) 
193 
Potowomut River, R.I. (NED) 70 
Powhatan Point, Ohio (ORH) 763, 756, 795, 799 
Prado Reservoir, Calif. (SPL) 1021 
Prairie du Pont Levee and Sanitary District, Ill. (LMS) 457 
Prairie du Rocher and vicinity, Illinois (LMS) 461 
Prarie du Chien Harbor, Wis. (NCD) 849 
Prattville, Autauga Creek, Ala. (SAM) 375 
Prescott area, Columbia County, Oreg. (NPP) 1139 
Presque Isle Harbor, Mich. (NCS) 821 
Presque Isle Peninsula, Erie, Pa. (NCB) 958, 965, 975 
Preston Drainage and Levee District, Illinois (LMS) 461 
See page 1297 for District abbreviations. 1317

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Prestonville, Ohio River Basin, Ky. (ORL) 733, 727 
Priest, J. Percy, Dam and Lake, Ohio River Basin, Tenn. (ORN) 
685, 688, 696 
Priest Rapids Dam, Columbia River, Wash. (NPS) 1172 
Princeton, W. Va. (ORH) 763 
Proctor Lake, Tex. (SWF) 516, 523, 526, 527 
Proctor, Otter Creek Basin, Vt. (NAN) 126 
Proctor, W. Va. (ORH) 763, 756, 795, 799 
Proctorville, Ohio (ORH) 763, 756 
Prompton Lake, Pa. (NAP) 140, 145 
Prospect Beach, West Haven, Conn. (NED) 72 
Providence River and Harbor, R.I. (NED) 15, 49 
Provincetown Beach, Provincetown, Mass. (NED) 72 
Provincetown Harbor, Mass. (NED) 15, 50 
Pudding River, Oreg. (NPP) 1141 
Pueblo, Arkansas River, Colo. (Floodway levee extension) (SWA) 
549 
Puget Sound and its Tributary Waters, Wash. (NPS) 1151, 1161, 
1165 
Pullman, Palouse River, Wash. (NPW) 1191 
Pultneyville Harbor, N.Y. (NCB) 976 
Pungo Creek, N.C. (SAW) 241, 250 
Pungo River, N. C. (SAW) 256 
Punxsutawney, Ohio River Basin, Pa. (ORP) 777, 787, 795 
Put-in-Bay, Ohio (NCE) 940 
Q 
Quail Wash Levee, Joshua Tree, Calif. (SPL) 1022 
Queens Creek, Va. (NAO) 224 
Queenstown Harbor, Md. (NAB) 193 
Quillayute River, Wash. (NPS) 1151, 1161, 1165 
Quinby Creek, Va. (NAO) 224 
Quincy Harbor, Ill. (NCD) 850 
Quincy, Ill Harbor Access Channel (NCR) 826, 833, 836 
Quincy Shore Beach, Quincy, Mass. (NED) 72 
R 
R. D. Bailey Lake, W. Va. (ORH) 745, 753 
Raccoon Creek levee, Ind. (Wabash River) (ORL) 733, 727 
Raccoon Creek, N. J. (NAP) 150 
Racine Harbor, Wis. (NCC) 866, 875, 883, 887 
Racine, Ohio (ORH) 763, 756 
Rahway, N. J. (NAN) 103, 115 
Rahway, South Branch, N. J. (NAN) 104, 115 
Rainier Drainage District, Oreg. (NPP) 1138, 1139, 1141 
Rancocas River, N. J. (NAP) 150 
Randleman Lake, N. C. (SAW) 235, 249, 255 
Randolph Reservoir, Va. (SAW) 255 
Rappahannock River at Bowlers Wharf, Va. (NAO) 224 
Rappahannock River, Va. (NAO) 208, 216 
Rappahannock Shoal Channel, Va. (NAO) 203 
Raritan Bay and Sandy Hook Bay, N. J. (NAN) 104, 115 
Raritan River, N.J. (NAN) 93, 114, 125 
Raritan River to Arthur Kill Cut Off Channel, N. J. (NAN) 125 
Rathbun Lake, Chariton River, Iowa (MRK) 620, 628 
Ravenswood, W. Va. (ORH) 763, 756 
Rayburn Dam and Reservoir, Tex. (SWF) 520, 524, 531 
Raymond, Willapa River, Wash. (NPS) 1171 
Raystown Reservoir, Raystown Branch, Juniata River, Pa. (NAB) 
183 
Red Brook Harbor, Bourne, Mass. (NED) 16, 50 
Red Creek, N. Y. (NCB) 961,966 
Red Dale Gulch, Rapid City, S. Dak. (MRO) 662 
Red Lake and Red Lake River, Minn. (NCS) 821 
Red Lake River, Minn., including Clearwater River, Minn. (NCS) 
810, 816 
Red River at Fargo, N. D. (NCS) 820 
Red River at Grand Forks, N. D. (NCS) 820 
Red River backwater area (MR&T) 1225, 1224, 1231, 1249, 1252 
Red River below Denison Dam, Levees and Bank Stabilization 
(New Orleans District) (LMN) 405, 410, 422 
Red River below Denison Dam (New Orleans Dist.) (LMN) 405, 
422, 423 
Red River Below Denison Dam (Tulsa District) (SWT) 585, 599 
Red River below Fulton, Ark. (LMN) 396, 409 
Red River in vicinity of Shreveport, La. (LMN) 423, 424 
Red River Lake, Ky. (ORL) 714, 699, 721 
Red River (MR&T) 1241 
Red River of the North drainage basin, Minn., S. Dak., & N. Dak. 
(NCS) 810, 816 
Red River of the North, Minn. and N. Dak. (NCS) 821 
Red River Parish, La. (LMN) 423, 424 
Red River, Tenn. (ORN) 695 
Red River Waterway, La., Ark., Okla., and Tex. (LMN) 421 
Red Rock Dam and Lake Red Rock, Iowa (NCR) 829, 834, 837 
Red Run, Clinton River, Mich. (NCE) 941 
Red Wing Harbor, Minn. (NCD) 849 
Redbank Creek Lake, Pa. (ORP) 799 
Reddies River Lake, N. C. (SAN) 264, 268, 273 
Redmond Dam and Lake, John, Drand (Neosho) River Basin, 
Kans. (SWT) 594, 598, 602 
Redondo Beach Harbor (King Harbor), Calif. (SPL) 1013 
Redwood City Harbor, Calif. (SPN) 1029, 1040, 1044 
Redwood Creek, Humboldt County, Calif. (SPN) 1037, 1041, 1046 
Reeds Bay Small Boat Harbor, Hawaii (POD) 1093 
Reedsport Levee, Umpqua River, Oreg. (NPP) 1113, 1126 
Reelfoot Lake area, Ky. and Tenn. (MR&T) 1234 
Reese River, Battle Mountain, Nevada, (SPK) 1083 
Reevesville, Ohio River Basin, Ill. (Cache River) (ORL) 733, 727, 
730 
Rehoboth Beach to Indian River Inlet, Del. (NAP) 151 
Removing the Water Hyacinth from Navigable Waters in the State 
of Florida (SAJ) 299, 309, 319 
Rend Lake Reservoir, Big Muddy River, Ill. (LMS) 457 
Reno Beach-Howard Farms Area, Lucas County, Ohio (NCE) 941 
Republican River, Bartley, Nebr. (MRK) 637 
Republican River near Inavale, Nebr. (MRK) 638 
Reservoirs at headwaters of Mississippi River (NCS) 805, 814, 818 
Restoration of Indian Fishing Grounds, Bonneville, Oreg. (NPP) 
1144 
Revere Beach, Mass. (NED) 72 
Reynoldsville, Pa. (ORP) 799 
Rheem Creek, Calif. (SPN) 1049 
Rhodes Point to Tylerton, Md. (NAB) 162, 181 
Rice Creek, Fla. (SAJ) 320 
Richland Creek, Ill. (LMM) 461 
Richland Hills Local Flood Protection, Tex. (SWF) 529 
Richland Lake, Gasconade River, Mo. (MRK) 63,$638 
Richmond Harbor, Calif. (SPN) 1030, 1040, 1044 
Richmond Harbor, Maine (NED) 70 
Richmond's Island Harbor, Maine (NED) 70 
Ridgway, Pa. (ORP) 777, 788, 795, 799 
Rio Grande Basin, N. Mex. (SWA) 539, 544, 547, 550 
Rio Grande Floodway, N. Mex. (SWA) 541, 545, 547, 550 
Rio Hondo Basin, Calif. (SPL) 1015, 1016, 1017, 1019 
Ripley, Ohio (ORH) 763, 756, 760 
Ririe Lake, Willow Creek, Idaho (NPW) 1179, 1187 
Rising Sun, Ohio River Basin, Ind. (ORL) 733, 727 
See page 1297 for District abbreviations. 1318

INDEX 
River Rouge, Mich. (NCE) 917, 926, 936 
Riverdale, Mass. (NED) 74, 78 
Riverview, W. Va. (ORH) 763, 756 
Roanoke-Rapids Reservoir, N. C. (SAW) 255 
Roanoke River Basin, Va. and N. C. (SAW) 244, 250, 255 
Roanoke River, N. C. (SAW) 254 
Robert S. Kerr Lock and Dam No. 15, Arkansas River, Okla. 
(SWT) 566, 589, 596, 599, 600 
Robert S. Kerr Marine Terminal, Ark. (SWT) 600 
Rochester and McCleary's Bluff levee, Ill. (ORL) 699, 714, 721, 727 
Rochester Harbor, N. Y. (NCB) 955, 965, 974 
Rochester, Minn. (NCS) 824 
Rochester, Pa. (ORP) 795, 799 
Rochester Reservoir, Upper Mississippi River Basin, Iowa (NCR) 
839 
Rock Hall Harbor, Md. (NAB) 193 
Rock Island Harbor, Ill. (NCD) 849 
Rock Island, Ill. (NCR) 830, 834, 837 
Rock River agricultural levees, Illinois (NCR) 839 
Rock River, Ill., and Wis., at South Beloit, Illinois (NCR) 839 
Rockcastle Creek, Inez, Ky. (ORH) 746, 753 
Rockfish Creek, N. C. (SAW) 242, 250 
Rockford, Ill. (NCR) 830, 834, 837 
Rockford, Minn. (NCS) 824 
Rockland Harbor, Maine (NED) 70 
Rockland Lake, Neches River, Texas (SWF) 530, 531 
Rockport Harbor, Maine (NED) 70 
Rockport Harbor, Mass. (NED) 16, 50 
Rockport, Ohio River Basin, Ind. (ORL) 733, 727, 731 
Rocky Fork, Ohio (ORH) 763, 758, 760 
Rocky Pass, Alaska (NPA) 1212 
Rocky River Harbor, Ohio (NCB) 956, 965, 974 
Rodeo Creek, Calif. (SPN) 1049 
Rogers City, Mich. (NCE) 940 
Rogue River Harbor at Gold Beach, Oregon (NPP) 1103, 1124 
Roland Drainage District, Arkansas River, Ark. (SWL) 571 
Rollinson Channel, N. C. (SAW) 230, 248 
Rome, Coosa River, Ga. (SAM) 375 
Rome (Mohawk River), N. Y. (NAN) 126 
Rome, Ohio River'Basin, Ind. (ORL) 733, 727 
Rondout Harbor, N. Y. (NAN) 125 
Rose Creek channel improvements, San Diego, Calif. (SPL) 1002, 
1009 
Roseau River, Minn. (NCS) 811, 816 
Rosendale, N. Y. (NAN) 106, 115 
Roseville, Ohio (ORH) 746, 753, 757 
Rosiclare, Ill. (Ohio River) (ORL) 733, 730 
Rossview, Tenn. and Ky. (ORN) 696 
Rouge River Lake and channel improvement, Ky. (ORL) 714, 699, 
721, 727, 729, 731 
Rouge River, Mich. (NCE) 910, 925, 932 
Roundup, Mont., Musselshell River (MRO) 663 
Rouses Point, Lake Champlain, N. Y. (NAN) 125 
Rouseville, Pa. (ORP) 799 
Rowlesburg Lake, W. Va. (ORP) 778, 788 
Royal River, Maine (NED) 16, 50 
Rush River, Lower Branch, N. Dak. (NCS) 823 
Rush River, N. D. (NCS) 820 
Rushford, Minn. (NCS) 811,816 
Russell and Allison levee, Illinois (Wabash River) (ORL) 733, 728 
Russell Creek, S. C. (SAN) 272 
Russell, Ky. (ORH) 763, 757 
Russian River Basin, Calif. (SPN) 1037, 1041, 1046, 1048 
Rutland, Otter Creek, Vt. (NAN) 126 
Rutledge Hollow Creek, Channel Improvement, Poteet, Tex. 
(SWF) 516, 523 
Rye Harbor, N. H. (NED) 70 
S 
Sabine-Neches Waterway, Tex. (SWG) 470, 478, 487, 493, 497, 502 
Sabula, Mississippi River, Iowa (NCR) 839 
Sackets Harbor, N. Y. (NCB) 976 
Saco, Mont. (MRO) 662 
Saco River, Maine (NED) 50 
Sacramento River and tributaries, Calif., from Collinsville to Shasta 
Dam (SPK) 1068, 1076, 1078, 1081 
Sacramento River and tributaries, California (debris control) 
(SPK) 1084, 1266, 1269, 1271 
Sacramento River, Calif. (SPK) 1052, 1074, 1078, 1079, 1267, 1269, 
1270, 1271 
Sag Harbor, N. Y. (NAN) 125 
Saginaw River, Mich. (NCE) 911,918, 925, 926, 932, 936 
Sakonnet Harbor, R. I. (NED) 70 
Sakonnet River, R. I. (NED) 70 
Salamanca, N. Y. (ORP) 778, 788 
Salamonie Lake, Ind. (ORL) 699, 714, 721 
Salem Church Lake, Va. (NAO) 214, 217 
Salem Harbor, Mass. (NED) 70 
Salem River, N. J. (NAP) 150 
Salina, Smoky Hill River, Kansas (MRK) 636, 638 
Salinas River, Calif. (SPN) 1049 
Saline, Kans. (MRK) 637 
Saline Point, La. (LMN) 423, 424 
Saline River and tributaries, Ill. (ORL) 699, 715, 721 
Saline River, Ark. (LMK) 435 
Salkahatchie River, S. C. (SAN) 272 
Salmon Creek at Oakridge, Oreg. (NPP) 1142 
Salmon River, Alaska (NPA) 1213 
Salmon River, Oreg. (NPP) 1134 
Salt Creek and Tributaries, Nebr. (MRO) 648, 654 
Salt Creek, Barnard, Kans. (MRK) 637, 638 
Salt Creek in vicinity of Middletown, Ill., Salt Creek, Ill. (NCC) 
895 
Salt Creek Lake, Ohio (ORH) 746, 753 
Salt Creek, Yamhill River, Oreg. (NPP) 1141 
Salt Lake City, Jordan River, Utah (SPK) 1083 
Salt River, Ky. (ORL) 731 
Salyersville, Licking River, Ky. (ORL) 734 
Sam Rayburn Reservoir, Tex. (SWF) 520, 524, 531 
Sammamish River, Wash. (NPS) 1152, 1161, 1165, 1171 
San Angelo Lake, Tex. (SWF) 516, 523 
San Antonio and Chino Creeks channel, Calif. (SPL) 1021 
San Antonio Channel Improvement, Tex. (SWF) 517, 523, 531 
San Antonio Reservoir, Calif. (SPL) 1021 
San Diego Creek, Alice, Tex. (SWG) 492 
San Diego Harbor, Calif. (SPL) 990, 1006, 1011 
San Diego River and Mission Bay, Calif. (SPL) 991, 1006 
San Diego River (Mission Valley), San Diego River Basin, Calif. 
(SPL) 1002, 1009 
San Diego (Sunset Cliffs), Calif. (SPL) 994, 1007 
San Francisco Bay to Stockton, Calif. (SPK) 1053, 1074 
San Francisco Harbor and Bay, Calif. (SPN) 1031, 1041, 1045 
San Francisco Harbor, Calif. (SPN) 1030, 1040, 1045 
San Gabriel River Basin, Calif. (SPL) 1015, 1016, 1017, 1018, 1019 
San Gabriel River to Newport Bay, Orange County, Calif. (SPL) 
994, 1007 
San Gabriel River, tributary to Brazos River, Tex. (SWF) 517, 523, 
527 
San Joaquin River, Calif. (SPK) 1054, 1074, 1079, 1080 
San Juan Harbor, Puerto Rico (SAJ) 320 
San Juan, Puerto Rico (SAJ) 322 
San Lorenzo Creek, Calif. (SPN) 1049 
See page 1297 for District abbreviations. 1319

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
San Lorenzo River, Calif. (SPN) 1049 
San Pablo Bay and Mare Island Strait, Calif. (SPN) 1031, 1041, 
1045 
San Rafael Creek, Calif. (SPN) 1032, 1041, 1045 
Sand Creek Channel Improvement, Kans. (SWT) 603 
Sand Creek, Kan. (SWT) 605 
Sand Creek, Roggen, Colo. (MRO) 663 
Sand Hill Cove Beach, R. I. (NED) 72 
Sand Hill River, Minn. (NCS) 820, 824 
Sand Lake, Okla. (SWT) 605 
Sandburg Creek, Spring Glen, N. Y. (NAN) 106, 115 
Sandusky Harbor, Ohio (NCB) 956, 965, 974 
Sandusky River, Ohio (NCB) 976 
Sandy Bay (Harbor of Refuge), Cape Ann, Mass. (NED) 70 
Sandy Drainage District, Oreg. (NPP) 1138, 1139, 1141 
Sandy Hook Bay at Leonardo, N. J. (NAN) 125 
Sandy Hook Bay, N. J. (NAN) 125 
Sandy Lake Reservoir, Minn. (NCS) 819 
Sangamon River, Ill. (NCC) 895 
Santa Ana River Basin (and Orange County), Calif. (SPL) 1002, 
1009, 1021, 1022 
Santa Ana River Basin, Calif. (SPL) 1012, 1022 
Santa Barbara Harbor, Calif. (SPL) 992, 1007, 1011 
Santa Clara River Levee Improvement, Santa Clara River Basin, 
Calif. (SPL) 1022 
Santa Cruz County, Calif. (SPN) 1047 
Santa Cruz Harbor, Calif. (SPN) 1032, 1041, 1045 
Santa Fe flood control reservoir, Calif. (SPL) 1015 
Santa Fe flood control reservoir to Walnut Creek, Calif. (SPL) 1015 
Santa Maria Valley Levees, Santa Maria River Basin, Calif. (SPL) 
1022 
Santa Paula Creek channel improvement, Santa Clara River Basin, 
Calif. (SPL) 1003, 1009 
Santa Rosa Wash (Tat Momolikot Dam) (SPL) 997 
Santee River, N. C. & S. C. (SAN) 272 
Sapelo Harbor, Ga. (SAS) 284 
Sardis, Ohio (ORH) 763, 757 
Sardis Reservoir (MR&T) 1225, 1235 
Sasanoa River, Maine (NED) 70 
Sasco Hill Beach, Fairfield, Conn. (NED) 72 
Satilla River, Ga. (SAS) 284 
Saugatuck Harbor and Kalamazoo River, Mich. (NCE) 914, 925, 
935 
Saugerties Harbor, N. Y. (NAN) 125 
Sauvie Island Drainage District, Oreg. (NPP) 1138, 1139, 1141 
Savage River Dam, Md. (NAB) 198 
Savanna Harbor, Ill. (NCD) 849 
Savannah Harbor, Ga. (SAS) 277, 282 
Savannah River above Augusta, Ga. (SAS) 284 
Savannah River at Augusta, Ga. (SAS) 284 
Savannah River Basin, Ga. and S. C. (SAS) 280, 284 
Savannah River Below Augusta, Ga. (SAS) 278, 282 
Sawmill Branch, S. C. (SAN) 265, 268 
Saxon Harbor, Wis. (NCS) 806, 815 
Saxonville, Mass. (NED) 76, 78 
Say Basin, Ill. (NCR) 831, 834, 837 
Saylorville Lake, Des Moines River, Iowa (NCR) 830, 834, 837 
Scappoose Drainage District, Oreg. (NPP) 1114, 1126, 1138, 1139 
Scarboro River, Maine (between Prout's Neck and Pine Point) 
(NED) 17, 50 
Schoolfield Reservoir, Va. and N. C. (SAW) 255 
Schuyler, Nebr. (MRO) 649, 654 
Schuylkill River above Fairmount Dam, Pa. (NAP) 150 
Schuylkill River, Pa. (NAP) 136, 144 
Scioto River at Portsmouth, Ohio (ORH) 755 
Sciotoville, Ohio (ORH) 763, 757 
Scituate Harbor, Mass. (NED) 70 
Scuppernong River, N. C. (SAW) 254, 256 
Searsport Harbor, Maine (NED) 70 
Seaside Park, Conn. (NED) 72 
Seattle Harbor, Wash. (NPS) 1169, 1170 
Sebewaing River, Mich. (NCE) 926, 939, 940 
Sebewaing, Sebewaing River, Mich. (NCE) 919, 936 
Seekonk River, R. I. (NED) 70 
Seldovia Harbor, Alaska (NPA) 1212 
Selkirk Shores State Park, Lake Ontario, N. Y. (NCB) 977 
Sergius-Whitestone Narrows, Alaska (NPA) 1204, 1210 
Seven County, Wis. (NCS) 824 
Sevier River Near Redmond, Utah (SPK) 1083 
Seward Harbor, Alaska (NPA) 1212 
Shad Landing State Park, Md. (NAB) 193 
Shallotte River, N. C. (SAW) 254 
Shark River, N. J. (NAN) 125 
Shawneetown, Ohio River Basin, Ill. (ORL) 734, 728, 730 
Sheboygan Harbor, Wis. (NCC) 867, 875, 883, 887 
Sheepshead Bay, N. Y. (NAN) 125 
Sheffield Lake Community Park, Ohio (NCB) 977 
Shelbyville Lake, Ill. (LMS) 456, 459 
Shell Creek, Nebr. (MRO) 662 
Shelley Area, Snake River, Columbia River Basin, Idaho (NPW) 
1190, 1191 
Shelton Ditch, Willamette River, Oreg. (NPP) 1141 
Shenango River Lake, Ohio River Basin, Pa. and Ohio (ORP) 778, 
788 
Sheridan, Yellowstone River, Wyo. (MRO) 649, 655 
Sherman, Texas (Post Oak Creek and Trib.) (SWT) 606 
Sherwood Island State Park, Westport, Conn. (NED) 72 
Shidler Lake, Arkansas River Basin, Okla. (SWT) 585, 594, 599 
Shields River, near Clyde Park, Mont. (MRO) 662 
Shilshole Bay, Seattle, Wash. (NPS) 1169, 1170 
Shinnecock Inlet, N. Y. (NAN) 125 
Shipyard River, S. C. (SAN) 262, 267 
Shoal Harbor and Compton Creek, N. J. (NAN) 125 
Shoals, East F1ork of White River, Ind. (ORL) 734 
Short Beach, Conn. (NED) 72 
Shoshone River, Lovell, Wyo. (MRO) 662 
Shot Pouch Creek, Sumter County, S. C. (SAN) 265, 268 
Shrewsbury River, N. J. (NAN) 93, 114 
Shufflebarger levee, Ohio River Basin, Ind. (Wabash River Basin) 
(ORL) 734, 728 
Silver Beach to Cedar Beach, Conn. (NED) 72 
Silver Lake Harbor, N. C. (SAW) 231, 248 
Sioux Falls, S. Dak. (MRO) 662 
Sistersville, W. Va. (ORH) 763, 757 
Sitka Harbor, Alaska (NPA) 1204, 1209, 1211 
Siuslaw River, Oreg. (NPP) 1103, 1124, 1131 
Six Runs Creek, Sampson County, N. C. (SAW) 242, 250 
Skaggs Ferry, Black River, Ark. (SWL) 571 
Skagit River, Wash. (Avon Bypass) (NPS) 1171 
Skagit River, Wash. (Levee and Channel Improvements) (NPS) 
1171 
Skagit River, Wash. (NPS) 1169, 1170 
Skagway Harbor, Alaska (NPA) 1204, 1209, 1211 
Skagway River, Alaska (NPA) 1213 
Skamokawa Creek, Wash. (NPP) 1134, 1139 
Skamokawa (Steamboat Slough), Wash. (NPP) 1134 
Skiatook Lake, Verdigris River Basin, Okla. (SWT) 585, 595, 599 
Skipanon Channel, Oreg. (NPP) 1104, 1124, 1131 
Slaughter Creek, Md. (NAB) 193 
Slovan, Pa. (ORP) 799 
Small Navigation Project, Sioux City, Iowa (MRO) 640, 653 
Smith Creek, Md. (NAB) 193 
See page 1297 for District abbreviations. 1320

INDEX 
Smith Creek (Pamlico County), N. C. (SAW) 254 
Smith Ferry, Pa. (ORP) 795, 799 
Smith Mountain Reservoir, Va. (SAW) 255 
Smith River, Oreg. (NPP) 1134 
Smithland crossing (MR&T) 1239 
Smithland, Ohio River Basin, Ky. (ORL) 734, 728 
Smiths Creek (Wilmington), N. C. (SAW) 254 
Smithville Channel, Little Platte River, Mo. (MRK) 620, 628 
Smithville Lake; Little Platte River, Mo. (MRK) 621, 628 
Smokey Hill, Soloman, Kans., Bridge Protection (MRK) 637 
Smyrna River, Del. (NAP) 150 
Snake River Downstream from Johnson Bar Landing, Oregon, 
Washington, and Idaho (NPW) 1185, 1188, 1198 
Snettisham, Alaska (NPA) 1206, 1209, 1211 
Snohomish River, Wash. (Ebey Slough) (NPS) 1172 
Snohomish River, Wash., Lowell-Snohomish River Road, left bank 
(NPS) 1172 
Sny Island Levee Drainage District, Ill. (NCR) 839 
Soap Creek, Willamette River. Oreg. (NPP) 1141 
Socorro diversion channel, tributaries of Rio Grande, N. M. (SWA) 
549 
Somers Point, Cape May County, N. J. (NAP) 151 
Somerville Lake, Tex. (SWF) 518, 524, 526, 527 
Sonoma Creek, Calif. (SPN) 1038, 1042, 1046 
South Amsterdam, N. Y., Mohawk River (NAN) 126 
South Bank Arkansas River (Head Fourche Island to Pennington 
Bayou), Ark. (SWL) 571 
South Bank Arkansas River, Little Rock to Pine Bluff, Ark.; Tucker 
Lake (SWL) 571 
South Bowers, Kent County, Del. (NAP) 151 
South Branch Wild Rice River and Felton Ditch, Minn. (NCS) 823 
South Bristol Harbor, Maine (NED) 70 
South Coventry Reservoir, Conn. (NED) 77, 78 
South Creek, N. C. (SAW) 242, 250 
South Deer Creek Levee, Okla. (SWT) 603, 605 
South Ellenville, N. Y. (NAN) 107, 115 
South Fork, Clearwater River, Idaho (NPW) 1190 
South Fork of Cumberland River, Ky. (ORN) 695 
South Haven Harbor, Mich. (NCE) 914, 926, 935 
South Milwaukee Harbor, Wis. (NCC) 893 
South Orange, N. J. (NAN) 107, 115 
South Platte River Basin, Colo. (MRO) 650, 657 
South Platte River Levees and Channel Improvements, Chatfield 
Reservoir to Ft. Morgan, Colo. (MRO) 662 
South Plymouth Reservoir, Canasawacta Creek, N. Y. (NAB) 198 
South Point, Ohio (ORH) 763, 757 
South Portsmouth, Ky. (ORH) 763, 757 
South Quincy Drainage and Levee District, Ill. (NCR) 840 
South River Drainage District, Mo. (NCR) 840 
South River, N. C. (SAW) 254 
South St. Paul, Minnesota (NCS) 824 
South Tunbridge Reservoir, Vt. (NED) 74 
South Tunbridge, Vt. (NED) 78 
South Williamson, Ky. (ORH) 747, 753 
Southern New York Flood Control Projects (NAB) 169, 183 
Southport Beach, Conn. (NED) 72 
Southport Harbor, Conn. (NED) 70 
Southwest Harbor, Maine (NED) 70 
Southwestern Jefferson County, Ky. (ORL) 699, 715, 721 
Sowashee Creek, Meridian, Miss. (SAM) 375 
Spanish Fork River, Utah (SPK) 1083 
Sparta, Tenn. (ORN) 697 
Spewrell Bluff Dam and Reservoir, Ga. (SAM) 354, 361 
Spokane, Spokane River, Wash. (NPS) 1171 
Spring City, Tenn. (ORN) 696 
Spring Creek, Springdale, Ark. (SWT) 604 
Springdale, Mass. (NED) 74, 78 
Springfield, Mass. (NED) 74, 78 
Squaw Chute at Quincy, Ill. (NCR) 835 
St. Albans Harbor, Lake Champlain, Vt. (NAN) 125 
St. Augustine Harbor, Fla. (SAJ) 320 
St. Catherines Sound, Md. (NAB) 193 
St. Clair River, Mich. (NCE) 911,925, 933, 937 
St. Croix River, Maine (NED) 70 
St. Croix River, Minn. & Wis. (NCS) 805, 815, 818 
St. Francis and L'Anguille Rivers and Blackfish Baymu, Ark. 
(LMM) 443 
St. Francis Basin, Ark. and Mo. (MR&T) 1226, 1233, 1256 
St. Francis River (MR&T) 1226, 1233, 1250 
St. Genevieve Levee District No. 1, Mo. (LMS) 461 
St. James, Beaver Island, Mich. (NCE) 939, 940 
St. Jeromes Creek, Md. (NAB) 162, 181 
St. Johns Bayou, Mo. (MR&T) 1234 
St. Johns River, Jacksonville to Lake Harney, Fla. (SAJ) 320 
St. Jones River, Del. (NAP) 150 
St. Joseph Harbor, Mich. (NCE) 912, 925, 933, 940 
St. Joseph, Mo. cut-off (MRK) 637 
St. Louis County Drainage and Levee District, Mo. (LMS) 461 
St. Lucie Inlet, Fla. (SAJ) 299, 309 
St. Maries, St. Joe River, Idaho (NPS) 1171 
St. Marks River, Fla. (SAM) 374 
St. Marys, Pa. (ORP) 795, 799 
St. Marys River, Ga. and Fla., and North River, Ga. (SAS) 284 
St. Marys River, Mich. (NCE) 912, 925, 934, 938 
St. Marys, W. Va. (ORH) 763, 757 
St. Michael Canal, Alaska (NPA) 1212 
St. Michaels Harbor, Md. (NAB) 193 
St. Patricks Creek, Md. (NAB) 193 
St. Paul and South St. Paul, Minn. (NCS) 811, 816 
St. Paul Harbor, Minn. (NCD) 849 
St. Peters Creek, Md. (NAB) 193 
St. Petersburg Harbor, Fla. (SAJ) 320 
St. Regis River, Mont. (NPS) 1171 
St. Thomas Harbor, V. I. (SAJ) 320 
Stamford, Conn. (NED) 41, 55 
Stamford Harbor, Conn. (NED) 17, 50 
Stantonsburg Reservoir, N. C. (SAW) 255 
Starlings Creek, Va. (NAO) 209, 216 
Startup, Wallace River, Wash. (NPS) 1154, 1161, 1166 
State Road and Ebner Coulees, Wis. (NCS) 823 
Staten Island, N. Y. (NAN) 108, 115 
Staten Island Rapid Transit Railway Co. bridge across Arthur Kill, 
N. Y. (NAN) 96, 114 
Steel Brook, Watertown, Conn. (NED) 79 
Steinhatchee River, Fla. (SAJ) 321 
Stikine River, Alaska (NPA) 1205, 1209, 1211 
Stillaguamish River, Wash. (NPS) 1155, 1162, 1166, 1170 
Stillhouse Hollow Lake, Tex. (SWF) 518, 524, 526, 527 
Stillwater Creek and Tributaries, Stillwater, Okla. (SWT) 604, 606 
Stillwater Reservoir, Lackawanna River, Pa. (NAB) 173, 183 
Stillwell Drainage District, Tillamook Bay, Oreg. (NPP) 1142 
Stockton and Mormon Channels (diverting canal), Calif. (SPK) 
1054, 1074 
Stockton Harbor, Maine (NED) 70 
Stockton Lake, Sac River, Mo. (MRK) 621, 628, 636 
Stone Harbor, N.J. (NAP) 151 
Stonehouse Creek, Jefferson County, Kans. (MRK) 622, 628, 637 
Stonewall Jackson Lake, W. Va. (ORP) 779, 788 
Stonington Harbor, Conn. (NED) 70 
Stonington Harbor, Maine (NED) 70 
Stony Creek, Branford, Conn. (NED) 18, 50 
Stratford, Conn. (NED) 41, 55 
See page 1297 for District abbreviations. 1321

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Stratton, Ohio (ORP) 795, 798 
Strube Lake and Cougar Additional Power, South Fork McKenzie, 
Oreg. (NPP) 1144, 1137 
Stuart Gulch Dam, Boise, Idaho (NPW) 1179, 1187 
Stuart Reservoir, Va. and N. C. (SAW) 255 
Stumpy Point Bay, N. C. (SAW) 254 
Sturgeon Bay and Lake Michigan Ship Canal, Wis. (NCC) 867, 
875, 883, 887 
Sturgis, Ky. (ORL) 699, 715, 721, 728, 730 
Subdistrict No. 1 of Drainage Union No. 1 and Bay Island 
Drainage and Levee District No. 1, Illinois (NCR) 840 
Sucker Brook Dam, Conn. (NED) 30, 53, 74 
Sugar and Briar Creeks, N. C. (SAN) 265, 268 
Sugar Creek levee, Ohio River Basin, Ind. (Wabash River Basin) 
(ORL) 734, 728 
Sugar Hill Reservoir, N. H. (NED) 74, 78 
Suisun Bay Channel, Calif. (SPK) 1055, 1074 
Suisun Channel, Calif. (SPK) 1055, 1074 
Suisun Point Channel, Calif. (SPK) 1080 
Sullivan Falls Harbor, Maine (NED) 70 
Sulphur River, Ark., and Tex. (LMN) 421 
Summersville Lake, Ohio River Basin, W. Va. (ORH) 747, 753, 
758 
Sumpawanus (Babylon Creek), N. Y. (NAN) 125 
Sunbury, Pa. (NAB) 198 
Supervision of Harbor of Hampton Roads, Va. (Prevention of 
Obstructive and Injurious Deposits) (NAO) 209, 216 
Surry Mountain Lake, N. H. (NED) 30, 53, 74 
Susquehanna River above and below Havre de Grace, Md. (NAB) 
193 
Susquehanna River at Williamsport, Pa. (NAB) 163, 182 
Susquehanna River Flood Control Projects, N. Y. & Pa. (NAB) 
174, 183, 194 
Susquehanna River, Pa. (NAB) 163, 182, 188 
Sutton Lake, Ohio River Basin, W. Va. (ORH) 747, 753, 758 
Suwannee River, Fla. (SAJ) 321 
Swanton Harbor, Vt. (NAN) 125 
Sweetwater Creek, N. C. (SAW) 243, 250 
Sweetwater River, Sweetwater River Basin, Calif. (SPL) 1003, 1009 
Swift Creek, N. C. (SAW) 254 
Swift Creek, Pitt and Craven Counties, N. C. (SAW) 256 
Swiger Whitney, Young, Hobit levee, Salt Creek, Ill. (NCC) 896 
Swinomish Channel, Wash. (NPS) 1152, 1161, 1165 
Swoyersville and Forty Fort, Pa. (NAB) 198 
Sycamore Creek, Coffeyville, Kans. (SWT) 604 
Sykesville, Pa. (ORP) 799 
Syracuse, Ohio (ORH) 763, 757 
Syracuse, Oswego River Basin, N. Y. (NCB) 977 
T 
Taber Reservoir, Va. (SAW) 255 
Table Rock Lake, Mo. (SWL) 559, 563, 570 
Tacoma Harbor, Wash. (NPS) 1169, 1170 
Tacoma, Puyallup River, Wash. (NPS) 1155, 1162, 1166 
Tahchevah Creek Detention Reservoir and Channel IMprovements, 
Calif. (SPL) 1022 
Tahquitz Creek, Whitewater River Basin, Calif. (SPL) 1004 
Talkeetna River, Alaska (NPA) 1206, 1211 
Tallahala Reservoir, Pascagoula River, Miss. (SAM) 375 
Tallahatchie and Coldwater Rivers, Miss. (LMK) 435 
Tallapoosa River, Ala. (SAM) 374 
Tallow Hill, Ga. (SAS) 284 
Tampa Harbor, Fla. (SAJ) 300, 309 
Tangier Channel, Va. (NAO) 209, 216 
Tangipahoa River, La. (LMN) 421 
Tar River and tributaries, N. C. (SAW) 256 
Tar River, N. C. (SAW) 256 
Tar River, Princeville, N. C. (SAW) 256 
Tarentum, Pa. (ORP) 799 
Tarrytown Harbor, N. Y. (NAN) 125 
Taunton River, Mass. (NED) 70 
Tawas Bay Harbor, Mich. (NCE) 940 
Taylors Bayou, Tex. (SWG) 475, 479, 490 
Taylorsville Lake, Ky. (ORL) 716, 721, 728 
Taylorsville, Ohio River Basin, Ky. (Salt River) (ORL) 734, 730 
Teche-Vermillion Basins, La. (MR&T) 1230 
Tell City, Ohio River Basin, Ind. (ORL) 734, 728, 730 
Tenanta Harbor, Maine (NED) 70 
Tenasillahe Island, Clatsop County, Oreg. (NPP) 1139 
Tenkiller Ferry Lake, Arkansas River Basin, Okla. (SWT) 567, 590, 
596, 600, 602 
Tenmile Creek at Marianna, Pa. (ORP) 780, 788 
Tennessee River, Tenn., Ala., and Ky. (ORN) 680, 688, 690, 694, 
696 
Tensas Basin, La. and Ark. (MR&T) 1224, 1231, 1232 
Tensas River and Bayou Macon, La. (LMK) 435 
Terre Haute (Conover levee) Ind., (Wabash River) (ORL) 734, 730 
Terre Noire Creek, Ark. (LMK) 436 
Teton River, Idaho (NPW) 1190 
Texarkana Lake, Tex. (LMN) 419, 417, 410 
Texas City and Vic., Tex., Hurricane-Flood Protection (SWG) 475, 
479, 490 
Texas City Channel, Tex. (SWG) 470, 478, 489, 494, 502 
Thames River Basin, Conn., R.I. and Mass. (NED) 42, 77 
Thames River, Conn. (NED) 70 
The Cascades Canal, Columbia River, Oreg. (NPP) 1134 
The Dalles-Celilo Canal, Oreg. & Wash. (NPP) 1134 
The Dalles Dam, Columbia River, Wash. and Oreg. (NPP) 1120, 
1127, 1143 
The Inland Route, Mich. (NCE) 904, 923, 930 
The International St. Croix River Board of Control 1280 
The Island Reservoir, Vt. (NED) 74, 78 
Thimble Shoal Channel, Va. (NAO) 206 
Thomaston Dam, Conn. (NED) 36, 54, 75 
Thoroughfare Swamp, Wayne County, N. C. (SAW) 243, 250 
Three Islands Reservoir, Ohio River Basin, Tenn. (O)RN) 696, 697 
Three Rivers, Mass. (NED) 31, 53, 74 
Thumpertown Beach, Eastham, Mass. (NED) 72 
Tickfaw, Natalbany, Ponchatoula, and Blood Rivers, La. (LMN) 
421 
Ticonderoga River, N. Y. (NAN) 125 
Tijuana River Basin, Calif. (SPL) 1003, 1009 
Tilghman Island Harbor, Md. (NAB) 163, 182 
Tillamook Bay and Bar, Oreg. (NPP) 1104, 1124, 1131 
Tioga-Hammond Lakes, N. Y. (NAB) 174, 175 
Tionesta Reservoir, Ohio River Basin, Pa. (ORP) 780, 788 
Toad Suck Ferry Lock and Dam (No. 8), Ark. (SWL) 551,554 
Toad Suck Ferry lock and dam No. 8, Ark. (SWL) 554, 561, 565 
Tocks Island Lake, Pa., N. J., and N. Y. (NAP) 142, 145 
Toledo Harbor, Ohio (NCE) 914, 926, 935 
Tolu, Ohio River Basin, Ky. (ORL) 734, 728 
Tom Jenkins Dam, Ohio River Basin, Ohio (ORH) 748, 753, 758 
Tombigbee River tributaries, Miss., and Ala. (SAM) 347, 360, 375 
Toms River, N. J. (NAP) 150 
Tongue River, N. Dak. (NCS) 823 
Tongue River Reservoir, N. Dak. (NCS) 823 
Topeka, Kansas, Auburndale Waterworks, N. and S. Topeka Units 
(MRK) 637 
Topeka, Kansas River, Kans. (MRK) 622, 628, 636 
Topsail Beach and Surf City, N. C. (SAW) 256 
See page 1297 for District abbreviations. 1322

INDEX 
Toronto Lake, Arkansas River Basin, Kan. (SWT) 567, 586, 595, 
600, 602 
Torrington, East Branch, Conn. (NED) 78 
Torrington, West Branch, Conn. (NED) 78 
Totuskey Creek, Va. (NAO) 210, 216 
Touchet River, Wash. (NPW) 1190 
Towanda Lake, Kans. (SWT) 605 
Town Beach, Plymouth, Mass. (NED) 72 
Town Bluff Dam, Tex. (SWF) 506, 522,531 
Town Creek, Americus, Ga. (SAM) 375 
Town Creek, Harrodsburg, Ky. (ORL) 734 
Town Creek, Md. (NAB) 193 
Town Neck Beach, Sandwich, Mass. (NED) 72 
Townshend Lake, Vt. (NED) 31, 53, 74 
Tranquitas Creek, Kingsville, Tex. (SWG) 492 
Tranters Creek, N. C. (SAW) 243, 250 
Traverse City, Mich. (NCE) 939, 940 
Treatment of Yuba River debris situation - restraining barriers, 
Calif. (CDC) 1266, 1269 
Tred Avon River, Md. (NAB) 163, 182 
Trent River, N. C. (SAW) 254, 256 
Trenton Lake, Thompson River, Mo. (MRK) 638 
Trexler Lake, Pa. (NAP) 141, 145 
Tri-Pond levee Wabash River, Ill. (ORL) 699, 716, 721, 728 
Trinidad Lake, Purgatoire River, Colo. (SWA) 541, 545, 548 
Trinity River and Tributaries, Tex. (SWF) 506, 518, 529, 530 
Trinity River and Tributaries, Tex. (SWG) 471, 478, 489, 494, 503 
Trinity River Project, Tex. (SWF) 507, 522 
Trotters Shoals Dam and Reservoir, Ga. and S. C. (SAS) 281, 282 
Troublesome Creek, Ky. (ORL) 731 
Troy, Ohio River Basin, Ind. (ORL) 734, 728 
Truckee River and tributaries, Calif. and Nev. (SPK) 1083 
Truman, Harry S., Dam and Lake, Osage River, Mo. (MRK) 612, 
627, 636 
Trumbull Pond Lake, Conn. (NED) 44, 56 
Trussville, Ala. (SAM) 375 
Tucannon River, Camp Wooten, Wash. (NPW) 1179, 1187 
Tuckahoe River, Md. (NAB) 193 
Tuckerton Creek, N. J. (NAP) 150 
Tully Lake, Mass. (NED) 31, 53, 74 
Tulsa and West Tulsa, Okla. (SWT) 605 
Tulsa, Okla. (Mingo Creek) (SWT) 606 
Tulsa-West Tulsa Levees, Okla. (SWT) 603 
Turkey Creek, Okla. (SWT) 604 
Turkey Creek, Sumter County, S. C. (SAN) 266, 268 
Turner Prairie, Mill Creek, Oreg. (NPP) 1141 
Turtle Creek, Pa. (ORP) 781, 788 
Turtle Creek, Yukon, Okla. (SWT) 604 
Tuskahoma Lake, Okla. (SWT) 603, 605 
Tuttle Creek Lake, Big Blue River, Kans. (MRK) 623, 629, 636 
Twelve Mile Bayou, La. (LMN) 424 
Twitch Cove and Big Thorofare, Md. (NAB) 164, 182 
Two Harbors, Minn. (NCS) 806, 815, 818 
Two Rivers Dam, N. Mex. (SWA) 542, 545, 548 
Two Rivers Harbor, Wis. (NCC) 868, 876, 883,887 
Tyaskin Creek, Md. (NAB) 193 
Tygart Lake, W. Va. (ORP) 768, 786 
Tylers Beach, Va. (NAO) 210, 216 
Tyrone, Pa. (NAB) 175, 183 
U 
U.S. Army Engineer Waterways Experiment Station 1273 
Umatilla Harbor, Ore. (NPW) 1229, 1189 
Umatilla River (Echo), Columbia River Basin, Ore. (NPW) 1190, 
1191 
Umpqua River, Oreg. (NPP) 1105, 1125, 1131, 1142 
Unadilla, N. Y. (NAB) 175, 183 
Union City Dam, Pa. (ORP) 781, 788 
Union Lake, Mo. (LMS) 456, 459 
Union River, Maine (NED) 70 
Union Township Drainage District Levee, Upper Mississippi River 
Basin, Mo. (NCR) 840 
Union Village Dam, Vt. (NED) 32, 53, 74 
Uniontown, Ohio River Basin, Ky. (ORL) 734, 728, 730 
Uniontown, Pa. (ORP) 799 
Upper Chipola River, Fla., from Mariana to its mouth (SAM) 374 
Upper Grand River, Mo. (MRK) 638 
Upper Grays River area, Wash. (NPP) 1139 
Upper Iowa River, Iowa (NCS) 823 
Upper Machodoc Creek, Va. (NAB) 193 
Upper Marlboro, Md. (NAB) 198 
Upper Mississippi River Basin (Rock Island District) (NCR) 840 
Upper Mississippi River Basin (St. Louis Dist.) (LMS) 460 
Upper Mississippi River Basin (St. Paul Dist.) (NCS) 823 
Upper River Rouge, Mich. (NCE) 941 
Upper St. Francis River and floodway (MR&T) 1226 
Upper Thorofare, Deal Island, Md. (NAB) 193 
Upper White River, Ark. (SWL) 569 
Urbanna Creek, Va. (NAO) 224 
Utica Lake, Ohio 748, 753 
Utica, Ohio River Basin, Ind. (ORL) 734, 728 
V 
Valdez Harbor, Alaska (NPA) 1212 
Valley City D&LD, Ill. (LMS) 462 
Van Buren, Arkansas River, Ark. (SWL) 571 
Van Meter, Iowa (NCR) 840 
Vanceburg, Ky. (ORH) 763, 757 
Vancouver Lake Area, Wash. (NPP) 1141 
Vandalia Drainage and Levee District No. 21, Ill. (LMS) 456, 459 
Vaughn, Mont. (MRO) 649, 655 
Ventnor, Margate and Longport, N. J. (NAP) 151 
Ventura Marina, Calif. (SPL) 992, 1007 
Ventura-Pierpont area, California (SPL) 1014 
Ventura River Basin, Calif. (SPL) 1022 
Verdigris River, Kans. (SWT) 606 
Vermilion Harbor, Ohio (NCB) 957, 965, 975 
Vermillion River, S. Dak. (MRO) 662 
Vermillion to Sheffield Lake Village, Ohio (NCB) 977 
Vevay, Ohio River Basin, Ind. (ORL) 734, 728 
Vicksburg Harbor (MR&T) 1239 
Victory Reservoir, Vt. (NED) 74, 79 
Village Creek, Jackson and Lawrence Counties, White River, Ark. 
(SWL) 571 
Village Creek, S. C. (SAN) 263, 267 
Village Creek, White River, and Mayberry Levee Districts, Ark. 
(SWL) 551, 556, 562, 564 
Village of Delhi, Delaware County, N. Y. (NAP) 152 
Village of New Athens, Ill. (LMS) 456, 459 
Village of Walton, Delaware County, Pa. (NAP) 152 
Vince and Little Vince Bayous, Tex. (SWG) 475,479, 490 
Vincennes, Ind. (ORL) 734k 728, 730 
Vineyard Haven, Mass. (NED) 71 
Vinton Waterway, La. (LMN) 421 
Virginia Beach, Va. (NAO) 211, 216 
Virginia Key and Key Biscayne, Fla. (SAJ) 302, 309 
W. D. Mayo Lock and Dam (L & D No. 14) Arkansas River (SWL) 
566, 575, 600 
See page 1297 for District abbreviations. 1323

REPORT. OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
W. Kerr Scott Dam and Reservoir, Yadkin River, N. C. (SAN) 264, 
267, 273 
Wabash River Basin (ORL) 699, 716, 729 
Wabasha Harbor, Minn. (NCD) 849 
Waccamaw River, N. C. & S. C. (SAN) 262, 267 
Waco Lake, Tex. (SWF) 519, 524, 526, 527, 528 
Wahkiakum County Consolidated Diking District No. 1, Wash. 
(NPP) 1114, 1126, 1138, 1139 
Wahkiakum County Diking District No. 4, Wash. (NPP) 1114, 
1126, 1138, 1139 
Waianae Small Boat Harbor, Oahu, Hawaii (POD) 1093 
Waikiki Beach, Oahu, Hawaii (POD) 1088, 1090, 1092 
Wailoa Stream and Tributaries, Hawaii, Hawaii (POD) 1094 
Waimea Beach, Kauai, Hawaii (POD) 1093 
Wake Island Harbor, Wake Island (POD) 1093 
Waldo Lake Tunnel and Reregulating Works, North Fork, Middle 
Fork, Willamet River, Oreg. (NPP) 1144, 1137 
Wallabout Channel, N. Y. (NAN) 125 
Wallace Channel, Pamlico Sound, N. C. (SAW) 254 
Wallace Lake Reservoir, La. (LMN) 406, 410, 419, 423 
Wallace, W. Va. (ORP) 799 
Wallis Sands State Beach, Rye, N. H. (NED) 72 
Wallisville, Tex. (SWG) 472 
Walluski River, Clatsop County, Oreg. (NPP) 1139 
Walnut Bayou, Ark. (SWT) 603, 605 
Walnut Bayou Channel Improvement, Ark. (SWT) 603 
Walnut Creek, Calif. (SPK) 1070, 1076, 1082 
Walnut River, Kans. (SWT) 606 
Walter F. George lock and dam, Ala., and Ga. (SAM) 355, 361 
Wappapello Reservoir (MR&T) 1226, 1235 
Wappinger Creek at Pleasant Valley, N. Y. (NAN) 126 
Wappinger Creek, N. Y. (NAN) 125 
Ware, Mass. (NED) 79 
Wareham Harbor, Mass. (NED) 70 
Wareham-Marion, Mass. (NED) 79 
Warren, Minn., Snake River (NCS) 823 
Warren River, R. I. (NED) 70 
Warrenton Diking District 1, Clatsop County, Oreg. (NPP) 1139 
Warrenton Diking District 3, Clatsop County, Oreg. (NPP) 1140 
Warrenton Diking District 2, Clatsop County, Oreg. (NPP) 1140 
Warroad Harbor and River, Minn. (NCS) 820, 821 
Warroad River & Bull Dog Creek, Minn. (NCS) 812, 816 
Warsaw Harbor, Ill. (NCD) 850 
Warsaw, N. Y., Oatka Creek (NCB) 977 
Warwick Cove, R. I. (NED) 70 
Warwick River, Md. (NAB) 193 
Warwood, W. Va. (ORP) 795, 799 
Washington Aqueduct, Maintenance, Operation, and Capital 
Outlay of the (NAB) 177, 200 
Washington Canal and South River, N. J. (NAN) 125 
Washington, D. C. and vicinity (NAB) 198 
Washington Harbor, D. C. (NAB) 164, 182 
Washington, Pa. (ORP) 799 
Washita River, Andarko, Okla. (SWT) 604 
Washougal Area Levees, Clark County, Wash. (NPP) 1114, 1126 
Water Valley Lake, Ark. (SWL) 570 
Water Valley Reservoir, White River, Ark. and Mo. (SWL) 571 
Waterbury Reservoir, Winooski River Basin, Vt. (NAN) 109, 115, 
126 
Waterbury-Watertown, Conn. (NED) 79 
Wateree River, S. C. (SAN) 272 
Waterford, Hudson and Mohawk Rivers, N. Y. (NAN) 126 
Waterloo, Cedar River, Iowa (NCR) 831, 834, 837 
Waterloo, Nebr. (MRO) 649, 655 
Waterway connecting Pamlico Sound and Beaufort Harbor, N. C. 
(SAW) 231, 248 
Waterway connecting Port Townsend and Oak Bay, Wash. (NPS) 
1169, 1170 
Waterway connecting Swanquarter Bay with Deep Bay, N. C. 
(SAW) 254 
Waterway connecting Tombigbee and Tennessee Rivers, Ala., and 
Miss. (SAM) 345, 359 
Waterway from Empire, La., to Gulf of Mexico (LMN) 397, 409 
Waterway from Indian River Inlet to Rehoboth Bay, Del. (NAP) 
137, 144 
Waterway from Intracoastal Waterway to Bayou Dulac, La. 
(Bayous Grand Caillou and Le Carpe, La.) (LMN) 421 
Waterway from Little Choptank River to Choptank River, Md. 
(NAB) 193 
Waterway from White Lake to Pecan Island, La. (LMN) 421 
Waterway - Norfolk, Va., to Sounds of North Carolina (SAW) 254 
Waterway on the Coast of Virginia (NAO) 210, 216 
Watkins Glen, Oswego River Basin, N. Y. (NCB) 977 
Waukegan Harbor, Ill. (NCC) 868, 876, 883, 888 
Waurika Lake, Red River Basin, Okla. (SWT) 586, 595, 599 
Waverly, W. Va. (ORH) 763, 757 
Waycake Creek, N. J. (NAN) 125 
Webb District Improvement Co., Columbia County, Oreg. (NPP) 
1140 
Webbers Falls Lock and Dam No. 16, Arkansas River, Okla. 
(SWT) 566, 590, 596, 599, 600 
Weber River and Tributaries, Utah (SPK) 1083 
Weidmer Chemicals Drainage and Levee District, Mo. (LMS) 462 
Weiser River, Columbia River Basin, Idaho (NPW) 1190, 1191 
Wellfleet Harbor, Mass. (NED) 18, 50 
Wellington, Tex. (SWT) 604 
Wells Harbor, Guam (POD) 1093 
Wells Harbor, Maine (NED) 19, 51 
Wellsburg, W. Va. (ORP) 795, 799 
Wellsville, N. Y., Genesee River (NCB) 961, 966 
Wellsville, Ohio, Sec. I (ORP) 796, 799 
Wellsville Ohio, Sec. II (ORP) 796, 799 
Wenatchee River, Wash. (NPS) 1171 
Wessagusset Beach, Weymouth, Mass. (NED) 72 
West Branch Chisholm Creek, Kans. (SWT) 605 
West Branch Lake, Mahoning River, Ohio (ORP) 782, 788 
West Branch of Susquehanna River, Pa. (NAB) 176, 183, 197 
West Bridgewater, Pa. (ORP) 796, 799 
West Brookfield Reservoir, Mass. (NED) 74, 79 
West Canaan Reservoir, N. H. (NED) 74, 79 
West Fork Lake, W. Va. (ORH) 748, 753, 758 
West Fork of Mill Creek Lake, Ohio (ORL) 699, 716, 721, 729 
West Harbor, Ohio (NCE) 940 
West Hill Dam, Mass. (NED) 22, 51,73 
West Kentucky tributaries (MR&T) 1234, 1256 
West Muddy Creek & Marys River, Oreg. (NPP) 1141 
West of Morrilton, Arkansas River, Ark. (SWL) 571 
West Oneonta Reservoir, N. Y. (NAB) 169, 194, 196 
West Point, Chattahoochee River, Ga. (SAM) 375 
West Point Lake, Chattahoochee River Basin Ga. and Ala. (SAS) 
281, (SAM) 355, 361 
West Point, Nebr. (MRO) 662 
West Point, Ohio River Basin, Ky. (ORL) 734, 728 
West protection levee (Atchafalaya Basin & West Atchafalaya 
Floodways) (MR&T) 1229 
West Springfield, Mass. (NED) 74, 79 
West Tennessee Tributaries, (MR&T) 1226, 1234, 1256 
West Terre Haute, Ind. (ORL) 699, 717, 721, 728 
West Thompson Lake, Conn. (NED) 43, 56, 77 
West Warren, Mass. (NED) 79 
Westchester Creek, N. Y. (NAN) 95, 114 
Westcott Cove, Conn. (NED) 71 
See page 1297 for District abbreviations. 1324

INDEX 
Westerly, R. I. (NED) 79 
Westfield, Mass. (NED) 74, 79 
Westland District Improvement Co., Columbia County, Oreg. 
(NPP) 1140 
Weston, Vt. (NED) 79 
Westport, Conn. (NED) 79 
Westport District, Columbia & Clatsop Counties, Oreg. (NPP) 
1140 
Westport Harbor and Saugatuck River, Conn. (NED) 19, 51 
Westport, Ohio River Basin, Ky. (ORL) 734, 728 
Westport Slough, Oreg. (NPP) 1134 
Westville Lake, Mass. (NED) 44, 56, 77 
Weymouth Back River, Mass. (NED) 71 
Weymouth-Fore and Town Rivers, Boston Harbor, Mass. (NED) 
20, 51 
Wheeling-Benwood, W. Va. (ORP) 796, 799 
Wheeling, W. Va. (North Wheeling) (ORP) 796, 799 
Wheeling, W. Va. (Wheeling Island) (ORP) 796, 799 
Whiskey and Rock Creeks, Independence, Kans. (SWT) 604 
White Lake Harbor, Mich. (NCE) 915, 926, 935 
White Oak Dike, Bladen and Pender Counties, N. C. (SAW) 256 
White River, Ark. (above Peach Orchard Bluff) (SWL) 569 
White River, Ark. (below Newport) (LMM) 440, 442 
White River, Ark. (MR&T) 1252 
White River Basin (Little Rock Dist.) (SWL) 551, 556, 562, 565, 
570 
White River, Hartford, Vt. (NED) 32, 53, 78 
Whitebird Creek, Idaho (NPW) 1190 
Whitefish Point Harbor, Mich. (NCE) 915, 926, 935 
Whitesburg (No. Fork Ky. River), Ky. (ORL) 731 
Whitewater River Basin, Calif. (SPL) 1004, 1009, 1022 
Whitings Creek, Va. (NAO) 224 
Whitlow Ranch Reservoir, Queen Creek (SPL) 998 
Whitmanville Lake, Mass. (NED) 39, 55, 76 
Whitney Lake, Tex. (SWF) 520, 524, 526 
Whitney Point, N. Y. (NAB) 170, 196 
Whitney Point Reservoir, N. Y. (NAB) 170, 194, 195, 196 
Wichita and Valley Center, Kans. (SWT) 603, 605 
Wickford Harbor, R. I. (NED) 71 
Wicomico River, Md. (NAB) 165, 182 
Wiggins Mill Reservoir, N. C. (SAW) 255 
Wilcox, Pa. (ORP) 799 
Wild Rice and Marsh Rivers, Minn. (NCS) 820 
Wilder, Ohio River Basin, Ky. (ORL) 734, 728 
Wiley Creek Lake, Oreg. (NPP) 1141 
Wilkes-Barre, Hanover Township, Pa. (NAB) 198 
Willamette Falls Fish Ladder (NPP) 1137, 1141 
Willamette River above Portland and Yamhill River, Oreg. (NPP) 
1106, 1131, 1125 
Willamette River at Willamette Falls, Oreg. (NPP) 1107, 1125, 
1132, 1133 
Willamette River Bank Protection (NPP) 1137 
Willamette River Basin, Oreg. (Bank Protection) (NPP) 1115, 1126 
Willamette River Basin, Oreg. (NPP) 1115, 1126, 1137, 1141 
Willapa River and Harbor and Naselle River, Wash. (NPS) 1152, 
1161, 1165, 1168 
Williamsburg, Ky. (ORN) 697 
Williamson, W. Va. (ORH) 763 
Williamsport, Pa. (NAB) 198 
Williamstown, W. Va. (ORH) 763, 757 
Williamsville Reservoir, Vt. (NED) 79 
Willoughby Channel, Va. (NAO) 224 
Willow Creek Basin, N. Dak. (NCS) 823 
Willow Creek Lake, Heppner, Ore. (NPW) 1191 
Wilmington Harbor, Del. (NAB) 137, 144 
Wilmington Harbor, N. C. (SAW) 232, 248 
Wilmore, Pa. (ORP) 799 
Wilsey Brook, Wurtsboro, N. Y. (NAP) 152 
Wilson Creek and Tributaries (SWL) 572 
Wilson Harbor, N. Y. (NCB) 976 
Wilson Lake, Saline River, Kans. (MRK) 623, 629, 636 
Wilson Mills Reservoir, N. C. (SAW) 255 
Wilson Point Harbor, Conn. (NED) 71 
Winfield, Kans. (SWT) 605 
Winnibigoshish Reservoir, Minn. (NCS) 819 
Winnipesaukee Lake, N. H. (NED) 71 
Winona Harbors, Minn. (NCD) 849 
Winona, Minn. (NCS) 823 
Winooski River, Vt. (NAN) 126 
Winslow (tributaries of Little Colorado River), Little Colorado 
River Basin, Ariz. (SPL) 1004, 1009 
Winsted, Conn. (NED) 75, 79 
Winter Harbor, Va. (NAO) 224 
Winthrop Beach, Mass. (NED) 72 
Winthrop Harbor, Mass. (NED) 71 
Wisconsin River, Wis. (NCS) 821 
Wishart Point Channel, Va. (NAO) 211, 216 
Wister Lake, Arkansas River Basin, Okla. (SWT) 567, 586, 595, 
600, 602 
Withlacoochee River, Fla. (SAJ) 321 
Wolf and Jordan Rivers, Miss. (SAM) 345, 360 
Wolf Creek Dam and Lake Cumberland, Ohio River Basin, Ky. 
(ORN) 686, 688, 696 
Wolf River (Memphis Harbor), Tenn. (LMM) 439, 442 
Wood Island Harbor, Maine and Pool at Biddeford (NED) 71 
Wood River Drainage and Levee District, Ill. (LMS) 457 
Woodbridge Creek, N. J. (NAN) 125 
Woodbury Creek, N. J. (NAP) 150 
Woodbury, Tenn. (ORN) 697 
Woodcock Creek Lake, Pa. (ORP) 783; 788 
Woodland Street Bridge, Cumberland River at Nashville, Tenn. 
(ORN) 695 
Woodlands, W. Va. (ORH) 763, 757, 796, 799 
Woodmont Shore, Milford, Conn. (NED) 72 
Woods Hole Channel, Mass. (NED) 71 
Woodson Drainage District, Oreg. (NPP) 1138, 1140, 1141 
Woonsocket, R. I. (NED) 73, 79 
Worcester diversion, Mass. (NED) 73, 79 
Wrangell Harbor, Alaska (NPA) 1212 
Wrangell Narrows, Alaska (NPA) 1212 
Wrights Creek, N. C. (SAW) 254 
Wrightsville Beach, N. C. (SAW) 244, 250 
Wrightsville Reservoir, Winooski River Basin, Vt. (NAN) 109, 115 
Wynoochee Dam and Lake, Wash. (NPS) 1155, 1162, 1166 
Wynoochee River, Wash., Left bank (NPS) 1172 
Y 
Yadkin River, N. C. (SAN) 263, 272 
Yakima River at Ellensburg, Wash. (NPS) 1156, 1162, 1166, 1171 
Yakima River, West Richland, Wash. (NPW) 1191 
Yakima, Yakima River, Wash. (NPS) 1171 
Yalobusha River, Miss. (LMK) 435 
Yanubbee Creek, Broken Bow, Okla. (SWT) 604 
Yaquina Bay and Harbor, Oreg. (NPP) 1107, 1125, 1132 
Yatesville Lake, Ky. (ORH) 749, 753 
Yazoo Basin backwater (MR&T) 1226, 1249 
Yazoo Basin Headwater, Miss. (MR&T) 1254 
Yazoo Basin, Miss. (MR&T) 1225, 1233, 1249 
Yazoo City and Belnozi protection works (MR&T) 1225 
Yazoo River, main stem (MR&T) 1252 
Yazoo River, Miss. (LMK) 428, 432 
See page 1297 for District abbreviations. 1325

REPORT OF THE CHIEF OF ENGINEERS, U.S. ARMY 1970 
Yellow Jacket Creek, Hogansville, Ga. (SAM) 375 
Yellowstone River, W. Glendive, Mont. (MRO) 662 
Yonkers, N. Y. (NAN) 126 
York, Codorus Creek, Pa. (NAB) 176, 183 
York Harbor, Maine (NED) 71 
York River, Va. (NAO) 224 
York Spit Channel, Va. (NAO) 203 
Youghiogheny River Lake, Ohio River Basin, Pa. and Md. (ORP) 
783, 786 
Youghiogheny River, Pa. (ORP) 768, 788 
Youngs Bay and Youngs River, Oreg. (NPP) 1134 
Youngs River Dikes, Clatsop County, Oreg. (NPP) 1140 
Youngstown, Ohio (ORP) 784, 788
z 
Zanesville, Ohio (ORH) 763, 757 
Zippel Bay Harbor, Minn. (NCS) 821 
Zumbro River, Minn. (NCS) 812, 816 